Sample records for growth planning support

  1. Supporting Document Strategic Plan

    E-Print Network [OSTI]

    Auckland, University of

    1 Supporting Document Strategic Plan 2013­2020 #12;2 Supporting Document Strategic Plan 2013 more critical to the University's future than was the case in 2005. The purpose of this document are summarised via a SWOT analysis in Appendix 1. This document should therefore be read in conjunction

  2. Technology Support Strategic Plan MISSION STATEMENT

    E-Print Network [OSTI]

    Westfall, Peter H.

    1 Technology Support Strategic Plan MISSION STATEMENT Through collaboration and professionalism, the Technology Support Department provides the highest possible quality Information Technology (IT) services, support, and assistance to the University community. VISION STATEMENT Technology Support

  3. Planning support systems for spatial planning through social learning

    E-Print Network [OSTI]

    Goodspeed, Robert (Robert Charles)

    2013-01-01T23:59:59.000Z

    This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

  4. DOE Awards Small Business Contract for Support, Planning Services...

    Energy Savers [EERE]

    Awards Small Business Contract for Support, Planning Services to Office of Environmental Management DOE Awards Small Business Contract for Support, Planning Services to Office of...

  5. Site Support Program Plan Infrastructure Program

    SciTech Connect (OSTI)

    NONE

    1995-09-26T23:59:59.000Z

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  6. Academic Support Planning Committee Advisory to: Provost/EVC

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    of support services, including projections of staffing, workforce planning, and service needs, consideration2/12/2003 Academic Support Planning Committee Advisory to: Provost/EVC Chaired by: Vice Chancellor The Academic Support Planning Committee (ASPC) provides an administrative forum for bringing together key

  7. Decision support tools for policy and planning

    SciTech Connect (OSTI)

    Jacyk, P.; Schultz, D.; Spangenberg, L.

    1995-07-01T23:59:59.000Z

    A decision support system (DSS) is being developed at the Radioactive Liquid Waste Treatment Facility, Los Alamos National Laboratory (LANL). The DSS will be used to evaluate alternatives for improving LANL`s existing central radioactive waste water treatment plant and to evaluate new site-wide liquid waste treatment schemes that are required in order to handle the diverse waste streams produced at LANL. The decision support system consists of interacting modules that perform the following tasks: rigorous process simulation, configuration management, performance analysis, cost analysis, risk analysis, environmental impact assessment, transportation modeling, and local, state, and federal regulation compliance checking. Uncertainty handling techniques are used with these modules and also with a decision synthesis module which combines results from the modules listed above. We believe the DSS being developed can be applied to almost any other industrial water treatment facility with little modification because in most situations the waste streams are less complex, fewer regulations apply, and the political environment is simpler. The techniques being developed are also generally applicable to policy and planning decision support systems in the chemical process industry.

  8. Indonesia-Strengthening Planning Capacity for Low Carbon Growth...

    Open Energy Info (EERE)

    Growth in Developing Asia" Retrieved from "http:en.openei.orgwindex.php?titleIndonesia-StrengtheningPlanningCapacityforLowCarbonGrowthinDevelopingAsia&oldid70041...

  9. Australia: Townsville Sexual Assault Support Service (Family Planning Qld. Townsville)

    E-Print Network [OSTI]

    Amin, S. Massoud

    Australia: Townsville Sexual Assault Support Service (Family Planning Qld. Townsville) http://www.fpq.com.au/locations/tvillelocations.php Suite 2, 5 Castlemaine St., Kirwan QLD 4817 | Phone: (07) 4723 8184 Australia: Wollongong Urunga House

  10. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect (OSTI)

    Dieterle, S.E.

    1996-09-27T23:59:59.000Z

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  11. Operations Plan for Support Network Development

    SciTech Connect (OSTI)

    None

    2008-06-30T23:59:59.000Z

    This report describes the operational processes and strategies that are building a support network for the National Security Technology Incubator (NSTI) program. The NSTI program currently is under development as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Grant No. DE FG52-07NA28084. Although the NSTI program offers a wide array of in-house business services, there are a certain number of services that will be provided by entities outside of Arrowhead Center. This report identifies the steps needed to develop an appropriate support network. The Arrowhead Center is working with external service providers and key stakeholders to establish feasible referral and implementation mechanics offering NSTI program participants the most comprehensive incubation services possible.

  12. The Henley Accelerator supports ambitious high growth

    E-Print Network [OSTI]

    Reading, University of

    of a business in the 5-6% of SMEs that are on a high growth trajectory. Typically these businesses will have and Technology Centre, University of Reading, Earley Gate, Reading, Berkshire RG6 6BZ Tel: 0118 935 7115 Email

  13. North Slope Decision Support for Water Resource Planning and Management

    SciTech Connect (OSTI)

    Schnabel, William; Brumbelow, Kelly

    2013-03-31T23:59:59.000Z

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

  14. Multi-Year SSL Market Development Support Plan

    SciTech Connect (OSTI)

    Ledbetter, Marc R.

    2012-05-01T23:59:59.000Z

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will work closely with lighting industry organizations 'such as the Next Generation Lighting Industry Alliance, North American Illuminating Engineering Society, and the International Association of Lighting Designers' and with other government programs seeking to improve lighting energy efficiency. While DOE will work closely with these organizations and others from lighting and electric utility industry, the program will focus primarily on assisting buyers of SSL products and others acting on their behalf because satisfied buyers are essential to the success of SSL market adoption. The work product of DOE's efforts will primarily be information, of the right type, at the right time, and provided efficiently to those who can best use it. A secondary work product of DOE's program will be market opportunities, in which DOE will seek to reduce the risks and costs for manufacturers of SSL products to sell good quality, high performance products to motivated buyers. In short, DOE plans to implement a multi-year program that produces highly useful and widely available information for buyers and their agents, while producing important market opportunities for producers, avoids the mistakes of the past, and is closely coordinated with industry and government. The market needs and the overall strategy were used for deciding which types of programs and projects DOE should create, and what general form they should take. Progress toward achieving plan goals with the above program elements will be monitored and periodically reported.

  15. RD&D Study Plan for Advancement of Science and Engineering Supporting...

    Broader source: Energy.gov (indexed) [DOE]

    RD&D Study Plan for Advancement of Science and Engineering Supporting Geologic Disposal in Bedded Salt- March 2013 Workshop Outcomes RD&D Study Plan for Advancement of Science and...

  16. A Planning, Scheduling and Control Architecture for Advanced Life Support Systems

    E-Print Network [OSTI]

    Kortenkamp, David

    A Planning, Scheduling and Control Architecture for Advanced Life Support Systems V. Jorge Leon 77058 Abstract This paper describes an integrated planning, schedul- ing and control architecture and the requirements for plan- ning, scheduling and control architectures are pre- sented. Next, the main components

  17. Central African Republic-National Adaptation Plan Global Support...

    Open Energy Info (EERE)

    manual, Publications, Workshop Website http:undp-alm.orgprojectsn Program Start 2013 Country Central African Republic Middle Africa References National Adaptation Plan...

  18. OPTIMISED LAYOUT AND ROADWAY SUPPORT PLANNING WITH INTEGRATED INTELLIGENT SOFTWARE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and optimises the safety-to-cost ratio for : · deformation forecast for roadways in seam and surrounding rocks for roadways in seam · bolt support for gateroads (assessment of exclusion criteria and calculation

  19. Human-Automation Path Planning Optimization and Decision Support

    E-Print Network [OSTI]

    Cummings, M.L.

    2011-01-01T23:59:59.000Z

    Path planning is a problem encountered in multiple domains, including unmanned vehicle control, air traffic control, and future exploration missions to the Moon and Mars. Due to the voluminous and complex nature of the ...

  20. InternshipApplicationWrittenExercise Evaluation of the Saskatchewan Government Growth Plan

    E-Print Network [OSTI]

    Saskatchewan, University of

    InternshipApplicationWrittenExercise Evaluation of the Saskatchewan Government Growth Plan and the expectations on them. Using these elements, evaluate the Chapter on "Growing and developing Saskatchewan's Labour Force" (pp. 37-40 of Government of Saskatchewan, Saskatchewan Plan for Growth: Vision 2020

  1. REVIEW ARTICLE Models to support cropping plan and crop rotation decisions.

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . To support farmers and efficiently allocate scarce resources, decision support models are developed. DecisionREVIEW ARTICLE Models to support cropping plan and crop rotation decisions. A review JĂ©rĂ´me Dury /Published online: 8 July 2011 # INRA and Springer Science+Business Media B.V. 2011 Abstract Farmers must

  2. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-20T23:59:59.000Z

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  3. Engineering Task Plan for Water Supply for Spray Washers on the Support Trucks

    SciTech Connect (OSTI)

    BOGER, R.M.

    2000-02-03T23:59:59.000Z

    This Engineering Task Plan (ETP) defines the task and deliverables associated with the design, fabrication and testing of an improved spray wash system for the Rotary Mode Core Sampling (RMCS) System Support Trucks.

  4. Budget FY 1995 site support program plan WBS 6.10.1

    SciTech Connect (OSTI)

    Wemhoff, G.M.

    1994-09-01T23:59:59.000Z

    This is the program plan of Budget for the fiscal year 1995 site support. The topics of the program plan include a general mission statement, the primary customers, major activities performed to deliver products and services, program priorities, goals and objectives, assumptions, issues and constraints, performance measures, work breakdown structure and responsibility assignment matrix, description of activities and milestone list.

  5. BPM, 3/12-13/02 NSTX Research Plan Supported by

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    BPM, 3/12-13/02 NSTX Research Plan Supported by Martin Peng Oak Ridge National Laboratory, UT to accelerate research in FY03-04 to meet the FESAC 5-year Objective on ST #12;BPM, 3/12-13/02 NSTX Research programs #12;BPM, 3/12-13/02 NSTX Research Plan U.S. Collaborative Team members make crucial contributions

  6. Science and Technology Roadmapping to Support Project Planning

    SciTech Connect (OSTI)

    Mc Carthy, Jeremiah Justin; Haley, Daniel Joseph; Dixon, Brent Wayne

    2001-07-01T23:59:59.000Z

    Disciplined science and technology roadmapping provides a framework to coordinate research and development activities with project objectives. This case-history paper describes initial project technology needs identification, assessment and R&D ranking activities supporting characterization of 781 waste tanks requiring a 'hazardous waste determination' or 'verification of empty' decision to meet an Idaho state Voluntary Consent Order.

  7. Decision Support for IntegratedDecision Support for Integrated WaterWater--Energy PlanningEnergy Planning

    E-Print Network [OSTI]

    Keller, Arturo A.

    of Environmental Science and Management University of California, Santa Barbara April 10, 2009 #12;Project Impetus/Commercial -Industrial -Agriculture -Environment -Energy Energy Providers -Peak/Base -Generation Type -Location -Capacity Surface Water Ground Water Population Growth Industry Fuels Wind Hydro Solar Thermoelectric #12;System

  8. School of Architecture, Design and the Built Environment Urban Energy Monitoring to Support Sustainable Energy Planning

    E-Print Network [OSTI]

    Evans, Paul

    energy; (3) identify and tackle fuel poverty within the city; etc. In this research project we information model in order to understand in real- time the energy demand within the city and to support in the area of bid data integration in order to support urban energy monitoring and energy planning. Entry

  9. Quality assurance management plan (QAPP) special analytical support (SAS)

    SciTech Connect (OSTI)

    LOCKREM, L.L.

    1999-05-20T23:59:59.000Z

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  10. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-03T23:59:59.000Z

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  11. General Counsel`s office FY 1995 site support program plan WBS 6.10.5

    SciTech Connect (OSTI)

    Moreno, S.R.

    1994-09-01T23:59:59.000Z

    The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

  12. Financial services FY 1995 site support program plan WBS 6.10.4

    SciTech Connect (OSTI)

    Vodney, E.P.

    1994-09-01T23:59:59.000Z

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  13. General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1

    SciTech Connect (OSTI)

    Moreno, S.R.

    1995-09-01T23:59:59.000Z

    This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

  14. Fire protection program fiscal year 1995 site support program plan, Hanford Fire Department

    SciTech Connect (OSTI)

    Good, D.E.

    1994-09-01T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report describes the specific responsibilities and programs that the HFD must support and the estimated cost of this support for FY1995.

  15. Growth of Carbon Support for Proton-Exchange-Membrane Fuel Cell by

    E-Print Network [OSTI]

    Growth of Carbon Support for Proton-Exchange-Membrane Fuel Cell by Pulsed-Laser Deposition (PLDGDL)(catalyst) (pulsed laser deposition PLD) (plasma plume) () #12;III Abstract key word: Fuel CellPulsed Laser. People begin to develop fuel cells for seeking alternative energy sources. Fuel cell use the chemical

  16. High School Principals' Perceptions of Central Office Administrator Support For Planning, Coordinating, and Evaluating Teaching and the Curriculum

    E-Print Network [OSTI]

    Lawson, Kimberly Kelleher

    2011-10-21T23:59:59.000Z

    and the curriculum. The research was guided by a single overarching question: What are high school principal perceptions of support given to them by district central office administrators in the areas of planning, coordinating, and evaluating teaching...

  17. Texas geothermal R D and D program planning support document. Final report

    SciTech Connect (OSTI)

    Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

    1981-08-28T23:59:59.000Z

    Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

  18. Fire protection program fiscal year 1997 site support program plan - Hanford fire department

    SciTech Connect (OSTI)

    Good, D.E., Westinghouse Hanford

    1996-07-01T23:59:59.000Z

    The mission of the Hanford Fires Department (HFD) is to support the safe and timely cleanup of the Hanford Site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. this includes response to surrounding fire department districts under mutual aids agreements and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site. the fire department also provides site fire marshal overview authority, fire system testing, and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention and education.

  19. Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2

    SciTech Connect (OSTI)

    Good, D.E.

    1995-09-01T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline.

  20. Low temperature growth of ultra-high mass density carbon nanotube forests on conductive supports

    SciTech Connect (OSTI)

    Sugime, Hisashi; Esconjauregui, Santiago; Yang, Junwei; D'Arsié, Lorenzo; Robertson, John [Department of Engineering, University of Cambridge, Cambridge CB3 0FA (United Kingdom)] [Department of Engineering, University of Cambridge, Cambridge CB3 0FA (United Kingdom); Oliver, Rachel A. [Department of Materials Science and Metallurgy, University of Cambridge, Cambridge CB2 0FS (United Kingdom)] [Department of Materials Science and Metallurgy, University of Cambridge, Cambridge CB2 0FS (United Kingdom); Bhardwaj, Sunil [Istituto Officina dei Materiali-CNR, Laboratorio TASC, Trieste I-34149 (Italy) [Istituto Officina dei Materiali-CNR, Laboratorio TASC, Trieste I-34149 (Italy); Sincrotrone Trieste S.C.p.A., Strada Statale 14, Km 163.5, Trieste I-34149 (Italy); Cepek, Cinzia [Istituto Officina dei Materiali-CNR, Laboratorio TASC, Trieste I-34149 (Italy)] [Istituto Officina dei Materiali-CNR, Laboratorio TASC, Trieste I-34149 (Italy)

    2013-08-12T23:59:59.000Z

    We grow ultra-high mass density carbon nanotube forests at 450 °C on Ti-coated Cu supports using Co-Mo co-catalyst. X-ray photoelectron spectroscopy shows Mo strongly interacts with Ti and Co, suppressing both aggregation and lifting off of Co particles and, thus, promoting the root growth mechanism. The forests average a height of 0.38 ?m and a mass density of 1.6 g cm{sup ?3}. This mass density is the highest reported so far, even at higher temperatures or on insulators. The forests and Cu supports show ohmic conductivity (lowest resistance ?22 k?), suggesting Co-Mo is useful for applications requiring forest growth on conductors.

  1. U.S. Government Supports Low Emission Economic Growth (Fact Sheet)

    SciTech Connect (OSTI)

    Watson, A.; Sandor, D.; Butheau, M.

    2013-11-01T23:59:59.000Z

    Countries around the world face the challenge of maintaining long-term sustainable economic growth and development under the threat of climate change. By identifying and pursuing a sustainable development pathway now, they are better positioned to reach their economic growth goals while addressing climate change impacts and lowering greenhouse gas (GHG) emissions. Low emission development strategies - development plans that promote sustainable social and economic development while reducing long-term GHG emissions - provide a pathway to preparing for a global low emission future. Partner country governments are working with the U.S. government through the Enhancing Capacity for Low Emission Development Strategies (EC-LEDS) program to further their national development objectives.

  2. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    SciTech Connect (OSTI)

    DiVincenzo, E.P.

    1994-09-27T23:59:59.000Z

    The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

  3. Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    SciTech Connect (OSTI)

    NSTec Mission and Projects Division

    2010-09-30T23:59:59.000Z

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  4. Modeling and Field Test Planning Activities in Support of Disposal of Heat-Generating Waste in Salt

    SciTech Connect (OSTI)

    Rutqvist, Jonny; Blanco Martin, Laura; Mukhopadhyay, Sumit; Houseworth, Jim; Birkholzer, Jens

    2014-09-26T23:59:59.000Z

    The modeling efforts in support of the field test planning conducted at LBNL leverage on recent developments of tools for modeling coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This work includes development related to, and implementation of, essential capabilities, as well as testing the model against relevant information and published experimental data related to the fate and transport of water. These are modeling capabilities that will be suitable for assisting in the design of field experiment, especially related to multiphase flow processes coupled with mechanical deformations, at high temperature. In this report, we first examine previous generic repository modeling results, focusing on the first 20 years to investigate the expected evolution of the different processes that could be monitored in a full-scale heater experiment, and then present new results from ongoing modeling of the Thermal Simulation for Drift Emplacement (TSDE) experiment, a heater experiment on the in-drift emplacement concept at the Asse Mine, Germany, and provide an update on the ongoing model developments for modeling brine migration. LBNL also supported field test planning activities via contributions to and technical review of framework documents and test plans, as well as participation in workshops associated with field test planning.

  5. Brazil-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWendeGuo FengBoulder, CO) Jump to:

  6. India-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power BasicsGermany:Information IDSDloomis's pictureThrough the

  7. Kenya-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories on climateJuno Beach, Florida: EnergyKeasbey,

  8. Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories on climateJunoMedanos EnergyMMalawi: Energy Resources Jump

  9. Mexico-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories on climateJunoMedanosElectric CoMeridianMetlakatlaMarkets(CTI

  10. Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is aOrmesaPPTActPapillion-LaVista South

  11. Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6 NoSan Leandro,Law and PolicyEssex County is(CTI PFAN) |

  12. Egypt-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (The followingDirectLow CarbonOpen1 June,Ecofys|

  13. Guyana-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power BasicsGermany: EnergyPower Finance Jump to: navigation, searchGuyana's

  14. China-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWendeGuoCatalystPathways Calculator JumpforPFAN) | Open

  15. ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin: Energy ResourcesInformation istype

  16. Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: Eden Prairie, MinnesotaIndianapolis Power(CTI PFAN) |

  17. Analytical Plans Supporting The Sludge Batch 8 Glass Variability Study Being Conducted By Energysolutions And Cua's Vitreous State Laboratory

    SciTech Connect (OSTI)

    Edwards, T. B.; Peeler, D. K.

    2012-11-26T23:59:59.000Z

    EnergySolutions (ES) and its partner, the Vitreous State Laboratory (VSL) of The Catholic University of America (CUA), are to provide engineering and technical services support to Savannah River Remediation, LLC (SRR) for ongoing operation of the Defense Waste Processing Facility (DWPF) flowsheet as well as for modifications to improve overall plant performance. SRR has requested via a statement of work that ES/VSL conduct a glass variability study (VS) for Sludge Batch 8. SRR issued a technical task request (TTR) asking that the Savannah River National Laboratory (SRNL) provide planning and data reduction support for the ES/VSL effort. This document provides two analytical plans for use by ES/VSL: one plan is to guide the measurement of the chemical composition of the study glasses while the second is to guide the measurement of the durability of the study glasses. The measurements generated by ES/VSL are to be provided to SRNL for data reduction and evaluation. SRNL is to review the results of its evaluation with ES/VSL and SRR. The results will subsequently be incorporated into a joint report with ES/VSL as a deliverable to SRR to support the processing of SB8 at DWPF.

  18. Engineering task plan for rotary mode core sample truck calibration procedure support engineering

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-06-04T23:59:59.000Z

    This Engineering Task Plan defines the tasks associated with providing an overview, with respect to the Authorization Basis and PHMC procedures, as applicable, of the calibration documentation for operational equipment for which Characterization Engineering has calibration responsibility.

  19. Introducing the use of integrated Decision Support System in Natural Resources Planning

    E-Print Network [OSTI]

    Park, Hye Yeon, S.M. Massachusetts Institute of Technology

    2008-01-01T23:59:59.000Z

    The target subject of Natural Resources Planning (NRP) includes various systems and their elements, all of which are centered around the natural resource system. Given this characteristic complexity and a high degree of ...

  20. Towards sustainable settlement growth: A new multi-criteria assessment for implementing environmental targets into strategic urban planning

    SciTech Connect (OSTI)

    Schetke, Sophie, E-mail: schetke@uni-bonn.de [Institute of Geodesy and Geoinformation, Dept. of Urban Planning and Real Estate Management, University of Bonn, Nussallee 1, 53115 Bonn (Germany); Haase, Dagmar, E-mail: dagmar.haase@ufz.de [Humboldt University of Berlin, Department of Geography, Rudower Chaussee 16, 10099 Berlin, Germany, Helmholtz Centre for Environmental Research - UFZ, Department of Computational Landscape Ecology, Permoserstr. 15, 04318 Leipzig (Germany); Koetter, Theo, E-mail: koetter@uni-bonn.de [Institute of Geodesy and Geoinformation, Dept. of Urban Planning and Real Estate Management, University of Bonn, Nussallee 1, 53115 Bonn (Germany)

    2012-01-15T23:59:59.000Z

    For nearly one decade, the German political and research-agenda has been to a large extent determined by the ongoing question of how to limit the expansion of settlement areas around cities in order to preserve natural resources, make settlement growth more sustainable and to strengthen the re-use of existing inner-urban areas (see a.o. Koetter et al. 2009a, 2010; Schetke et al. 2009, 2010b). What is already under discussion within the international literature are the recommendations of the German Council for Sustainability to quantitatively reduce the daily greenfield consumption from the current rate of over 100 ha per day to a rate of 30 ha per day in 2020 and to bring urban infill development up to a ratio of 3:1 with greenfield development (German Council for Sustainability, 2004).). This paper addresses the added value beyond those abstract political targets and presents an innovative, multi-criteria assessment (MCA) of greenfield and infill sites to evaluate their sustainability and resource efficiency. MCA development and its incorporation into a Decision Support System (DSS) were accomplished by utilising a stakeholder-driven approach. The resulting tool can be applied in preparing and revising land-use plans. The paper presents the concept and the development process of the MCA-DSS. Test runs with planners prove that the evaluation of potential housing sites using individually weighted environmental indicators helps to identify those strategies of housing development that accord most closely with sustainability goals. The tests further show that the development of greenfield sites generally exhibits less sustainability than that of infill sites. - Highlights: Black-Right-Pointing-Pointer This paper presents an innovative, multi-criteria assessment (MCA) of greenfield and infill sites. Black-Right-Pointing-Pointer The MCA evaluates sustainability and resource efficiency of potential housing sites in a stakeholder-driven approach. Black-Right-Pointing-Pointer Test runs with planners identified prominent environmental indicators and assigned individual weights. Black-Right-Pointing-Pointer The resulting tool can be applied in preparing and revising land-use plans according to sustainable housing development. Black-Right-Pointing-Pointer Test runs also show that greenfield development generally exhibits less sustainability than infill development.

  1. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    SciTech Connect (OSTI)

    Hagan, J.W.

    1994-09-01T23:59:59.000Z

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

  2. Electric utility system master plan

    SciTech Connect (OSTI)

    Erickson, O.M.

    1992-10-01T23:59:59.000Z

    This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

  3. Materials management FY 1995 site support program plan WBS 6.10.7

    SciTech Connect (OSTI)

    Dahlin, E.C.

    1994-09-01T23:59:59.000Z

    The Work Breakdown Structure is tabulated for the six main activities within the materials management site support program. Materials Management involves the receipt, storage, issuance, management and disposition of the government`s physical assets. Property Management involves maintaining acceptable levels of property accountability and proper utilization of government owned property. Warehousing involves the shipping, receiving, storage, issuance, and distribution of materials, parts, components and equipment required to support the ongoing operation of the Hanford Site. Inventory Management maintains appropriate levels of general supplies, spare parts, and essential materials to ensure availability of items required to support site operations is timely and provided at the lowest possible cost. Investment Recovery involves the identification and disposition of assets excess to the needs of the site through redeployment, recycling initiatives, and public sale of surplus property. Property Systems operate, maintain and enhance the development of cost effective data systems to control and administer multi-contractor personal property assets.

  4. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  5. The Mixed Waste Management Facility: Technology selection and implementation plan, Part 2, Support processes

    SciTech Connect (OSTI)

    Streit, R.D.; Couture, S.A.

    1995-03-01T23:59:59.000Z

    The purpose of this document is to establish the foundation for the selection and implementation of technologies to be demonstrated in the Mixed Waste Management Facility, and to select the technologies for initial pilot-scale demonstration. Criteria are defined for judging demonstration technologies, and the framework for future technology selection is established. On the basis of these criteria, an initial suite of technologies was chosen, and the demonstration implementation scheme was developed. Part 1, previously released, addresses the selection of the primary processes. Part II addresses process support systems that are considered ``demonstration technologies.`` Other support technologies, e.g., facility off-gas, receiving and shipping, and water treatment, while part of the integrated demonstration, use best available commercial equipment and are not selected against the demonstration technology criteria.

  6. ANALYTICAL PLANS SUPPORTING THE SWPF GAP ANALYSIS BEING CONDUCTED WITH ENERGYSOLUTIONS AND THE VITREOUS STATE LABORATORY AT THE CUA

    SciTech Connect (OSTI)

    Edwards, T.; Peeler, D.

    2014-10-28T23:59:59.000Z

    EnergySolutions (ES) and its partner, the Vitreous State Laboratory (VSL) of The Catholic University of America (CUA), are to provide engineering and technical services support to Savannah River Remediation, LLC (SRR) for ongoing operation of the Defense Waste Processing Facility (DWPF) flowsheet as well as for modifications to improve overall plant performance. SRR has requested that the glass formulation team of Savannah River National Laboratory (SRNL) and ES-VSL develop a technical basis that validates the current Product Composition Control System models for use during the processing of the coupled flowsheet or that leads to the refinements of or modifications to the models that are needed so that they may be used during the processing of the coupled flowsheet. SRNL has developed a matrix of test glasses that are to be batched and fabricated by ES-VSL as part of this effort. This document provides two analytical plans for use by ES-VSL: one plan is to guide the measurement of the chemical composition of the study glasses while the second is to guide the measurement of the durability of the study glasses based upon the results of testing by ASTM’s Product Consistency Test (PCT) Method A.

  7. Name Title S1 Process Team Division Caitlin Angus Deputy Enrolment Manager Enrolment planning support Enrolments Student Client Services

    E-Print Network [OSTI]

    Liley, David

    Services John Castillo Apprenticeship Officer Apprentice DELTA and Training Plans HQ Croydon Student Client Services Hannah Broughan Apprenticeship Officer Apprentice DELTA and Training Plans HQ Croydon Student Client Services Amelinda Mack Apprenticeship Officer Apprentice DELTA and Training Plans HQ Wantirna

  8. PublishedbyManeyPublishing(c)IOMCommunicationsLtd Growth and structure of supported metal

    E-Print Network [OSTI]

    Harris, Peter J F

    particles P. J. F. Harris The applications of supported metal catalysts vary widely, from selective of particle/substrate interface for particle containing i, j atoms initial particle diameter particle diffusivity for particle containing i, j atoms particle diffusion coefficient surface self

  9. Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning...

    Open Energy Info (EERE)

    they can also support global goals by providing national strategic context to the abatement and adaptation efforts for which countries receive international recognition."...

  10. Photovoltaic Potential Assessment to Support Renewable Energies Growth in 10 EU Candidate Countries

    E-Print Network [OSTI]

    E. D. Dunlop; M. Šúri; T. A. Huld

    Abstract: We present a GIS database of solar radiation and photovoltaic (PV) potential estimations of 10 European Union Candidate Countries created to support. The database was integrated with a web application to provide access also for a broad public. An application was developed to browse and query GIS maps and to do a simple calculation for any location in the region. The established web site provides access also to analyses and relevant documents

  11. Iron-reducing bacteria accumulate ferric oxyhydroxide nanoparticle aggregates that may support planktonic growth

    SciTech Connect (OSTI)

    Luef, Birgit; Fakra, Sirine C.; Csencsits, Roseann; Wrighton, Kelly C.; Williams, Kenneth H.; Wilkins, Michael J.; Downing, Kenneth H.; Long, Philip E.; Comolli, Luis R.; Banfield, Jillian F.

    2013-02-04T23:59:59.000Z

    Iron-reducing bacteria (FeRB) play key roles in anaerobic metal and carbon cycling and carry out biogeochemical transformations that can be harnessed for environmental bioremediation. A subset of FeRB require direct contact with Fe(III) bearing minerals for dissimilatory growth, yet these bacteria must move between mineral particles. Further, they proliferate in planktonic consortia during biostimulation experiments. Thus, a key question is how such organisms can sustain growth under these conditions. Here we characterized planktonic microbial communities sampled from an aquifer in Rifle, Colorado, USA close to the peak of iron reduction following in situ acetate amendment. Samples were cryo-plunged on site and subsequently examined using correlated 2- and 3- dimensional cryogenic transmission electron microscopy (cryo-TEM) and scanning transmission X-ray microscopy (STXM). Most cells had their outer membranes decorated with up to 150 nm diameter aggregates composed of a few nm wide amorphous, Fe-rich nanoparticles. Fluorescent in situ hybridization of lineage-specific probes applied to rRNA of cells subsequently imaged via cryo-TEM identified Geobacter spp., a well studied group of FeRB. STXM results at the Fe L2,3 absorption edges indicate that nanoparticle aggregates contain a variable mixture of Fe(II)-Fe(III), and are generally enriched in Fe(III). Geobacter bemidjiensis cultivated anaerobically in the laboratory on acetate and hydrous ferric oxyhydroxides also accumulated mixed valence nanoparticle aggregates. In field-collected samples, FeRB with a wide variety of morphologies were associated with nano-aggregates, indicating that cell-surface Fe(III) accumulation may be a general mechanism by which FeRB can grow while in planktonic suspension.

  12. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01T23:59:59.000Z

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  13. UC Santa Cruz Information Technology Strategic Plan 2014 The primary mission of ITS is to provide high quality infrastructure, support, and innovation in the delivery of information

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    of resources resulted in an organization more well-situated to manage infrastructure, systems, and services high quality infrastructure, support, and innovation in the delivery of information technology products and directives for the organization and management of information technology at UCSC. This ITS Strategic Plan

  14. Enhanced Chemical Incident Response Plan (ECIRP). Appendix F, remediation analysis with Decision Support Tools (DSTs) for wide-area chemical hazards.

    SciTech Connect (OSTI)

    Hassig, Nancy L. (Pacific Northwest National Laboratory, Richland, WA); Pulsipher, Brent A. (Pacific Northwest National Laboratory, Richland, WA); Foltz, Greg W.; Hoette, Trisha Marie

    2011-07-01T23:59:59.000Z

    The Defense Threat Reduction Agency (DTRA) commissioned an assessment of the Consequence Management (CM) plans in place on military bases for response to a chemical attack. The effectiveness of the CM plans for recovering from chemical incidents was modeled using a multiple Decision Support Tools (DSTs). First, a scenario was developed based on an aerial dispersion of a chemical agent over a wide-area of land. The extent of contamination was modeled with the Hazard Prediction and Assessment Capability (HPAC) tool. Subsequently, the Analyzer for Wide Area Restoration Effectiveness (AWARE) tool was used to estimate the cost and time demands for remediation based on input of contamination maps, sampling and decontamination resources, strategies, rates and costs. The sampling strategies incorporated in the calculation were designed using the Visual Sample Plan (VSP) tool. Based on a gaps assessment and the DST remediation analysis, an Enhanced Chemical Incident Response Plan (ECIRP) was developed.

  15. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01T23:59:59.000Z

    in Load Forecasts to Support WGA and Resource Assessmentin Load Forecasts to Support WGA and Resource AssessmentMingst, 2006, “Resource Assessment in the West: Review of

  16. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01T23:59:59.000Z

    Portland General Electric (PGE), 2004. “Final Action Plan:Electric Co. Portland General Electric Public Service of NewPG&E) • Portland General Electric (PGE) • Public Service of

  17. Bacterial Source Tracking to Support the Development and Implementation of Watershed Protection Plans for the Lampasas and Leon Rivers: Lampasas River Watershed Final Report

    E-Print Network [OSTI]

    Gregory, L.; Casarez, E.; Truesdale, J.; Di Giovanni, G.; Owen, T.; Wolfe, J.

    2013-04-25T23:59:59.000Z

    Texas Water Resources Institute TR 441 April 2013 Bacterial Source Tracking to Support the Development and Implementation of Watershed Protection Plans for the Lampasas and Leon Rivers L. Gregory, E. Casarez, J. Truesdale, G. Di Giovanni, R... Oxygen E. coli Escherichia coli EPA Environmental Protection Agency ERIC-PCR Enterobacterial Repetitive Intergenic Consensus Sequence Polymerase Chain Reaction ERIC-RP ERIC-PCR and RiboPrinting Composite DNA Fingerprints LRW Leon River...

  18. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01T23:59:59.000Z

    Goal.6 Figure 2-2. Accounting for Energy Efficiency2-3. Accounting for Energy Efficiency Resources in LoadFigure 3-1. Plan Energy Efficiency Program Effects: Annual

  19. TEMPORARY SUPPORT HUMAN RESOURCES

    E-Print Network [OSTI]

    Su, Xiao

    TEMPORARY SUPPORT HUMAN RESOURCES GUIDELINE Workforce Planning | One Washington Square | San José of the Request for Temporary Support, Workforce Planning will make a determination of the type of temporary

  20. Hanford tanks initiative work plan -- subsurface characterization to support the closure-readiness demonstration for tank 241-AX-104

    SciTech Connect (OSTI)

    Barnett, D.B.

    1996-09-27T23:59:59.000Z

    This document presents a plan for subsurface investigation near 241-AX-104 Single-Shell tank. Objectives of the investigation are soil sampling and analyses (physical and chemical), local stratigraphic correlation, groundwater background characterization, and geophysical surveys. The primary purpose of the investigation is to supply physical and hydraulic properties for numerical modeling of vadose zone flow and transport.

  1. Software Quality Assurance Plan for GoldSim Models Supporting the Area 3 and Area 5 Radioactive Waste Management Sites Performance Assessment Program

    SciTech Connect (OSTI)

    Gregory J. Shott, Vefa Yucel

    2007-01-03T23:59:59.000Z

    This Software Quality Assurance Plan (SQAP) applies to the development and maintenance of GoldSim models supporting the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) performance assessments (PAs) and composite analyses (CAs). Two PA models have been approved by the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as of November 2006 for the PA maintenance work undertaken by National Security Technologies, LLC (NSTec). NNSA/NSO asked NSTec to assume the custodianship of the models for future development and maintenance. The models were initially developed by Neptune and Company (N&C).

  2. Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities in Support of Marine and Hydrokinetic Energy Deployment

    SciTech Connect (OSTI)

    Geerlofs, Simon H.; Copping, Andrea E.; Van Cleve, Frances B.; Blake, Kara M.; Hanna, Luke A.

    2011-09-30T23:59:59.000Z

    This fiscal year 2011 progress report summarizes activities carried out under DOE Water Power Task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the marine and hydrokinetic (MHK) energy industry, including regulatory and resource management agencies, tribes, nongovernmental organizations, and industry. Objectives for Task 2.1.7 are the following: • to work with stakeholders to streamline the MHK regulatory permitting process • to work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development • to communicate research findings and directions to the MHK industry and stakeholders • to engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which is described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning. As MHK industry partners work with the regulatory community and stakeholders to plan, site, permit, and license MHK technologies, they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under Task 2.1.7 is to understand and work to address these varied interests, reduce conflict, identify efficiencies, and ultimately reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

  3. Logistical and transportation infrastructure in Asia : potential for growth and development to support increasing trade with Europe

    E-Print Network [OSTI]

    Deonás, Nikolaos, 1978-

    2004-01-01T23:59:59.000Z

    This thesis examines the implications of the rapid growth in demand for trade between Europe and Asia for the existing transportation network and logistical infrastructure. In general terms, technologies need to improve ...

  4. A Game Theoretic Radio Access Network Selection scheme in a 4G mobile environment supporting capacity planning

    E-Print Network [OSTI]

    Pitsillides, Andreas

    A Game Theoretic Radio Access Network Selection scheme in a 4G mobile environment supporting of diverse technologies. Fourth Generation (4G) of mobile networks is envisioned as a common, flexible is currently a solution of an all-IP network layer, i.e. there is a common core network but different access

  5. Hanford 200 Areas Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Daly, K.S.

    1993-08-01T23:59:59.000Z

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  6. A decision analysis framework to support long-term planning for nuclear fuel cycle technology research, development, demonstration and deployment

    SciTech Connect (OSTI)

    Sowder, A.G.; Machiels, A.J. [Electric Power Research Institute, 1300 West. W.T Harris Boulevard, Charlotte, NC 28262 (United States); Dykes, A.A.; Johnson, D.H. [ABSG Consulting Inc., 300 Commerce, Suite 200, Irvine, CA 92602 (United States)

    2013-07-01T23:59:59.000Z

    To address challenges and gaps in nuclear fuel cycle option assessment and to support research, develop and demonstration programs oriented toward commercial deployment, EPRI (Electric Power Research Institute) is seeking to develop and maintain an independent analysis and assessment capability by building a suite of assessment tools based on a platform of software, simplified relationships, and explicit decision-making and evaluation guidelines. As a demonstration of the decision-support framework, EPRI examines a relatively near-term fuel cycle option, i.e., use of reactor-grade mixed-oxide fuel (MOX) in U.S. light water reactors. The results appear as a list of significant concerns (like cooling of spent fuels, criticality risk...) that have to be taken into account for the final decision.

  7. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    SciTech Connect (OSTI)

    Eto, Joseph; Stovall, John P.

    2003-04-01T23:59:59.000Z

    The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

  8. LIST OF DECOMMISSIONING LESSONS-LEARNED IN SUPPORT OF THE DEVELOPMENT OF A STANDARD REVIEW PLAN FOR NEW REACTOR LICENSING

    E-Print Network [OSTI]

    Memorandum To; David B. Matthews; Elmo E. Collins

    2006-01-01T23:59:59.000Z

    Staff in the Division of New Reactor Licensing (DNRL) requested assistance from the Division of Waste Management and Environmental Protection (DWMEP) in the development of a standard review plan (SRP) for the licensing of new reactor facilities. Specifically, DNRL staff requested a list of high-level decommissioning lessons-learned that new applicants for a reactor license should address in order to minimize, to the extent practicable, contamination of the facility and the environment, facilitate eventual decommissioning, and minimize, to the extent practicable, the generation of radioactive waste. DWMEP staff met with your staff several times to discuss and clarify the requested input. This requested information is provided in Enclosure 1. I would like to bring to your attention other sources of decommissioning lessons-learned. The list of lessons-learned provided in Enclosure 1 is a subset of a much larger set of decommissioning lessons-learned. DWMEP developed the list in Enclosure 1 by reviewing the lessons-learned described in other documents (Enclosure 2) and selecting those it felt were most significant, based on DWMEP decommissioning experience. Additionally, the Electric Power Research Institute (EPRI) has developed decommissioning lessons-learned. DWMEP has not reviewed those lessons-learned because they are considered proprietary information by EPRI. DWMEP staff also developed a comprehensive bibliography of documents containing decommissioning lessons-learned. The bibliography is posted on the Nuclear Regulatory Commission’s public website. CONTACT: Rafael L. Rodriguez, NMSS/DWMEP

  9. Virginia Energy Plan (Virginia)

    Broader source: Energy.gov [DOE]

    The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the state’s energy picture through an examination of the state’s primary energy...

  10. Michigan Collateral Support Program (Michigan)

    Broader source: Energy.gov [DOE]

    The Michigan Collateral Support Program, supported by the Michigan Growth Fund, aims to supply cash collateral accounts to lenders in order to assist borrowers collateral coverage needs. To...

  11. ORISE: Operations Support and Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    semi-annual meetings and on-going exercises. Related Links ORISE Develops Asset Readiness Management System to Track Emergency Response Exercises and Equipment ORISE Implements...

  12. Administrative Systems Planning: Supporting Academic

    E-Print Network [OSTI]

    Ferrara, Katherine W.

    Process Analysis Requirements Analysis Technical Design Development Implementation Operations Reviews (2007-2011) · Time Reporting System (A&FS) · Pre-Purchasing System (CA&ES) · Campus Asset academic enterprise to maximize learning and research outcomes ­ Reforming our administrative operations

  13. ORISE: Operations Support and Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACK MappingHistory The OakMentorExercisesof EnergyMaking a

  14. A Master Plan for Sustainable Tourism Development — Koh Lanta Yai, Krabi Province

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    Landscape Architecture and Environmental Planning supportedLandscape Architecture and Environmental Planning UniversityLandscape Architecture and Environmental Planning Professor

  15. UNL CAMPUS & LANDSCAPE MASTER PLANS

    E-Print Network [OSTI]

    Farritor, Shane

    are to both support the upkeep and maintenance of existing landscapes on campus and to support the designPLAN BIG UNL CAMPUS & LANDSCAPE MASTER PLANS NOVEMBER 2013 #12;#12;PLAN BIG ARCHITECTURAL AND LANDSCAPE GUIDELINES #12;4 #12;5 TABLE OF CONTENTS INTRODUCTION Purpose and Introduction 6 The Plan Big

  16. Management Plan Management Plan

    E-Print Network [OSTI]

    ; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

  17. The Planning, Licensing, Modifications, and Use of a Russian Vessel for Shipping Spent Nuclear Fuel by Sea in Support of the DOE RRRFR Program

    SciTech Connect (OSTI)

    Michael Tyacke; Dr. Igor Bolshinsky; Wlodzimierz Tomczak; Sergey Naletov; Oleg Pichugin

    2001-10-01T23:59:59.000Z

    The Russian Research Reactor Fuel Return (RRRFR) Program, under the U.S. Department of Energy’s Global Threat Reduction Initiative, began returning Russian-supplied high-enriched uranium (HEU) spent nuclear fuel (SNF), stored at Russian-designed research reactors throughout the world, to Russia in January 2006. During the first years of making HEU SNF shipments, it became clear that the modes of transportation needed to be expanded from highway and railroad to include sea and air to meet the extremely aggressive commitment of completing the first series of shipments by the end of 2010. The first shipment using sea transport was made in October 2008 and used a non-Russian flagged vessel. The Russian government reluctantly allowed a one-time use of the foreign-owned vessel into their highly secured seaport, with the understanding that any future shipments would be made using a vessel owned and operated by a Russian company. ASPOL-Baltic of St. Petersburg, Russia, owns and operates a small fleet of vessels and has a history of shipping nuclear materials. ASPOL-Baltic’s vessels were licensed for shipping nuclear materials; however, they were not licensed to transport SNF materials. After a thorough review of ASPOL Baltic’s capabilities and detailed negotiations, it was agreed that a contract would be let with ASPOL-Baltic to license and refit their MCL Trader vessel for hauling SNF in support of the RRRFR Program. This effort was funded through a contract between the RRRFR Program, Idaho National Laboratory, and Radioactive Waste Management Plant of Swierk, Poland. This paper discusses planning, Russian and international maritime regulations and requirements, Russian authorities’ reviews and approvals, licensing, design, and modifications made to the vessel in preparation for SNF shipments. A brief summary of actual shipments using this vessel, experiences, and lessons learned also are described.

  18. Office of Sustainability Support

    Broader source: Energy.gov [DOE]

    The Office of Sustainability Support serves as AU’s organizational lead in partnering with the Department’s Sustainability Performance Office to support the understanding and implementation of sustainability programs and requirements within the Department, including through supporting development and implementation of DOE’s annual Strategic Sustainability Program Plan.

  19. IS&T FY2009 Operational Plans Page 1 of 17 Current as of July 22, 2008 Functional Area: Client Support Services

    E-Print Network [OSTI]

    Gabrieli, John

    -line mechanisms · Improve tools to enhance delivery of support services (e.g. eOn implementation, Request Tracker

  20. Municipal Energy Plan Program (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    Ontario is supporting local energy planning by introducing the Municipal Energy Plan (MEP) program. The MEP program is designed to help municipalities better understand their local energy needs ...

  1. Greensburg Sustainable Comprehensive Plan

    High Performance Buildings Database

    Greensburg, KS In October 2007, the architectural and planning firm, BNIM, was selected formally by the City of Greensburg, with support from the USDA, to prepare the first phase of a comprehensive master plan to rebuild the city, which provides a framework for the rebuilding of Greensburg based around the principles of economic, social and environmental sustainability. The BNIM Planning team presented the final draft of Greensburg's Comprehensive Plan to the City Council and to a public hearing on January 16, 2008.

  2. Towards a Very Low Energy Building Stock: Modeling the U.S. Commercial Building Sector to Support Policy and Innovation Planning

    E-Print Network [OSTI]

    Coffey, Brian

    2010-01-01T23:59:59.000Z

    World Energy Outlook (IEA 2008), the bottom up models supporting IPCC “economic mitigation potentials” (IPCC 2007), the buildings chapter of the US assessment

  3. ACHIEVE is a system designed to support employee and organizational achievement, development and success. The system has three interrelated components: performance planning (setting goals),

    E-Print Network [OSTI]

    Brownstone, Rob

    1 ACHIEVE ACHIEVE is a system designed to support employee and organizational achievement), professional development, and reflection or learning from experience. Ongoing support and feedback throughout to achieve organizational success, individual goals must align with broader unit and organizational goals. 2

  4. DOE Selects 8(a) Small Business for Technical Support Services...

    Office of Environmental Management (EM)

    Support Cleanup of New York West Valley Demonstration Project DOE Awards Support Service Contract DOE Awards Small Business Contract for Support, Planning Services to Office of...

  5. Workforce planning for reconfiguration and downsizing

    SciTech Connect (OSTI)

    Stahlman, E.J.; Lewis, R.E.; Ross, T.L.

    1993-11-01T23:59:59.000Z

    The Pacific Northwest Laboratory was tasked by the Department of Energy Albuquerque Field Office (DOE-AL) to develop a workforce assessment and transition planning tool to support integrated decision making at a single DOE installation. The planning tool permits coordinated, integrated workforce planning to manage growth, decline, or transition within a DOE installation. The tool enhances the links and provides commonality between strategic, programmatic, and operations planners and human resources. Successful development and subsequent scent complex-wide implementation of the model also will facilitate planning at the national level by enforcing a consistent format on data that are now collected by installations in corporate-specific formats that are not amenable to national-level analyses. The workforce assessment and transition planning tool consists of two components: the Workforce Transition Model and the Workforce Budget Constraint Model. The Workforce Transition Model, the preponderant of the two, assists decision makers identify and evaluate alternatives for transitioning the current workforce to meet the skills required to support projected workforce requirements. The Workforce Budget Constraint Model helps estimate the number of personnel that will be effected by a given a workforce budget increase or decrease and assists in identifying how the corresponding hirings or layoffs should be distributed across the COCS occupations.

  6. Development of a core design optimization tool and analysis in support of the planned LEU conversion of the MIT Research Reactor (MITR-II) ; Development of a core design optimization tool and analysis in support of the planned low enriched uranium conversion of the MIT Research Reactor (MITR-II) .

    E-Print Network [OSTI]

    Connaway, Heather M. (Heather Moira)

    2012-01-01T23:59:59.000Z

    ??The MIT Research Reactor (MITR-II) is currently undergoing analysis for the planned conversion from high enriched uranium (HEU) to low enriched uranium (LEU), as part… (more)

  7. Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report

    SciTech Connect (OSTI)

    Geerlofs, Simon H.; Hanna, Luke A.; Judd, Chaeli R.; Blake, Kara M.

    2012-09-01T23:59:59.000Z

    This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry. Objectives for 2.1.7 are the following: • To work with stakeholders to streamline the MHK regulatory permitting process. • To work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development. • To communicate research findings and directions to the MHK industry and stakeholders. • To engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which are described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning As the MHK industry works with the regulatory community and stakeholders to plan, site, permit and license MHK technologies they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under 2.1.7 is to understand these varied interests, explore mechanisms to reduce conflict, identify efficiencies, and ultimately identify pathways to reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

  8. The Water School Planning Committee would like to thank all of our generous sponsors for their support of Polk County Water School 2012.

    E-Print Network [OSTI]

    Ma, Lena

    for their support of Polk County Water School 2012. Out-of-County Field Tour Session VI: May 24st , 2012 8:00 ­ 5 River and Charlotte Harbor (King Fisher Fleet, Punta Gorda, 941-639-2628) 1:30 Maran Hilgendorf, Charlotte Harbor Environmental Center Shannon McGee, Extension Agent, UF/IFAS Polk County Extension Return

  9. Financial Planning Resource Allocation

    E-Print Network [OSTI]

    Barrash, Warren

    Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

  10. Operating plan FY 1998

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  11. Office of the Chief Financial Officer Strategic Plan 2008-2012

    E-Print Network [OSTI]

    Various

    2008-01-01T23:59:59.000Z

    their budgets and workforce planning. Decision support (datateam is to focus on workforce planning, its alignment with

  12. Engineering testing and technology projects FY 1996 Site Support Program Plan, WBS 6.3.3 and 6.3.8. Revision 1

    SciTech Connect (OSTI)

    Brown, L.C.

    1995-10-01T23:59:59.000Z

    The engineering laboratory services for development, assembly, testing, and evaluation to support the resolution of WHC, Hanford, and DOE complex wide engineering issues for 1996 are presented. Primary customers are: TWRS, spent nuclear fuels, transition projects, liquid effluent program, and other Hanford contractors and programs. Products and services provided include: fabrication and assembly facilities for prototype and test equipment, development testing, proof of principle testing, instrumentation testing, nondestructive examination application development and testing, prototype equipment design and assembly, chemical engineering unit operations testing, engineering test system disposal, and safety issue resolution.

  13. Growth of Ag icosahedral nanocrystals on a SrTiO3,,001... support Fabien Silly and Martin R. Castella

    E-Print Network [OSTI]

    Castell, Martin

    . Castella Department of Materials, University of Oxford, Parks Road, Oxford OX1 3PH, United Kingdom Received identification of the supported shape of the icosahedral form. © 2005 American Institute of Physics. DOI: 10 positions. Therefore, for sufficiently small particles with a large surface area-to-volume ratio, multiply

  14. PNNL Campus Master Plan

    SciTech Connect (OSTI)

    Mosey, Whitney LC

    2012-09-07T23:59:59.000Z

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  15. Business Services Strategic Plan

    E-Print Network [OSTI]

    Holland, Jeffrey

    Business Services Strategic Plan Updated September 2008 New Synergies: Launching Tomorrow's Leaders Discovery with Delivery Meeting Global Challenges Excellence in Business and Support Services #12;Introduction The mission of Business Services at Purdue University is to enable, serve, and support others

  16. Towards a Very Low Energy Building Stock: Modeling the U.S. Commercial Building Sector to Support Policy and Innovation Planning

    SciTech Connect (OSTI)

    Coffey, Brian; Borgeson, Sam; Selkowitz, Stephen; Apte, Josh; Mathew, Paul; Haves, Philip

    2009-07-01T23:59:59.000Z

    This paper describes the origin, structure and continuing development of a model of time varying energy consumption in the US commercial building stock. The model is based on a flexible structure that disaggregates the stock into various categories (e.g. by building type, climate, vintage and life-cycle stage) and assigns attributes to each of these (e.g. floor area and energy use intensity by fuel type and end use), based on historical data and user-defined scenarios for future projections. In addition to supporting the interactive exploration of building stock dynamics, the model has been used to study the likely outcomes of specific policy and innovation scenarios targeting very low future energy consumption in the building stock. Model use has highlighted the scale of the challenge of meeting targets stated by various government and professional bodies, and the importance of considering both new construction and existing buildings.

  17. A municipal guide to least cost utility planning

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    The recent track record of ``traditional`` electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states` least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  18. DOE Awards Small Business Contract to Support Cleanup of New...

    Energy Savers [EERE]

    Task Order for Disposal of Los Alamos National Lab Waste DOE Awards Support Service Contract DOE Awards Small Business Contract for Support, Planning Services to Office of...

  19. Treatment of Solar Generation in Electric Utility Resource Planning

    SciTech Connect (OSTI)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01T23:59:59.000Z

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  20. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    SciTech Connect (OSTI)

    Bechtel Nevada

    1998-12-31T23:59:59.000Z

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  1. Technology Planning in Smaller Organizations or Nonprofits

    E-Print Network [OSTI]

    Schweik, Charles M.

    1 Technology Planning in Smaller Organizations or Nonprofits (This is quite practical material...) Before we begin: See http://www.nten.org/ Why Undertake Technology Planning? Source: Podolsky, 2003 Wired for Good Planning can ensure technology supports the mission and strategic goals Planning

  2. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

  3. Sustainability Support

    Broader source: Energy.gov [DOE]

    Sustainability Support serves as a corporate technical assistance, coordination, and integration resource to support line organizations in the resolution of sustainability issues and management concerns.

  4. SNF Project Engineering Process Improvement Plan

    SciTech Connect (OSTI)

    DESAI, S.P.

    2000-02-09T23:59:59.000Z

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities.

  5. Transportation Institutional Plan

    SciTech Connect (OSTI)

    Not Available

    1986-08-01T23:59:59.000Z

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  6. Supporting design planning through process model simulation

    E-Print Network [OSTI]

    Flanagan, Tomás Leo

    2007-02-13T23:59:59.000Z

    -results and no action was taken to make the ship more stable. Finally, the technical challenges of designing the Vasa were also instrumental in the project's failure: it was larger than contemporary ships and had two gun-decks with heavy artillery when the norm... was to place lighter guns on the upper gun-deck. Ultimately, it was this design characteristic which caused the ship to become unstable and sink. Almost 400 years later, the desire to design better products faster prevails and many of the associated...

  7. Program Execution Plan Mission Support Organizations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins Gerald HahnThomasProgram Booklet/2014

  8. Institutional Plan FY 2003 - 2007

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd

    2003-01-27T23:59:59.000Z

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

  9. Vermont Employment Growth Incentive (Vermont)

    Broader source: Energy.gov [DOE]

    The purpose of the Employment Growth Incentive (VEGI) is to encourage job creation in Vermont by a Vermont company, a Vermont division of a company that plans to grow and expand in Vermont, a...

  10. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  11. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain [Stakeholder Relations Director, Sellafield Ltd, Cumbria (United Kingdom)

    2012-07-01T23:59:59.000Z

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

  12. CALIFORNIA SMART GROWTH ENERGY SAVINGS

    E-Print Network [OSTI]

    (particularly autos) comprises a large share of total energy consumption, its reduction through more compact in transportation energy consumption resulting from Smart Growth planning. Since energy consumed by transportationCALIFORNIA ENERGY COMMISSION CALIFORNIA SMART GROWTH ENERGY SAVINGS MPO SURVEY FINDINGS SEPTEMBER

  13. California Commissioning Collaborative: 2007 Program Plan

    E-Print Network [OSTI]

    Parks, J.

    2007-01-01T23:59:59.000Z

    California Commissioning Collaborative: 2007 Program Plan Presented by: Jim Parks, Chair CCC Board of Directors November 1, 2007 © California Commissioning Collaborative © California Commissioning Collaborative Mission and Organization • Improve... and RCx as a strategy for meeting efficiency goals • CCC projects provide support and resources © California Commissioning Collaborative 2007 Program PlanSupport for Retrocommissioning Programs – Verification of Savings • Retrocommissioning Market...

  14. Egypt's population policies and family planning program: a critical examination

    E-Print Network [OSTI]

    Carr, Aline B.

    1996-01-01T23:59:59.000Z

    Egypt's national family planning program, in existence since 1965, has been fairly successful in increasing the use of family planning methods and lowering the population growth rate in Egypt. However, the fact that as few as 10 percent of women...

  15. Environmental Planning and Ecology Program Annual Report.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2008-01-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  16. Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

  17. Institutional Plan FY 2001-2005

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01T23:59:59.000Z

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  18. An Analysis of Hybrid Life Support Systems for Sustainable Habitats

    E-Print Network [OSTI]

    Shaw, Margaret Miller

    2014-01-01T23:59:59.000Z

    The design of sustainable habitats on Earth, on other planetary surfaces, and in space, has motivated strategic planning with respect to life support (LS) system technology development and habitat design. Such planning ...

  19. ARM - Lesson Plans: Rate of Coral Growth

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related InformationAcid Rain OutreachMoving

  20. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    SciTech Connect (OSTI)

    Quadrel, Marilyn J.

    2004-04-15T23:59:59.000Z

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  1. Pretreatment Technology Plan

    SciTech Connect (OSTI)

    Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

    1993-03-01T23:59:59.000Z

    This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

  2. Business Plan Competitions and Technology Transfer

    SciTech Connect (OSTI)

    Worley, C.M.; Perry, T.D., IV

    2012-09-01T23:59:59.000Z

    An evaluation of business plan competitions, with a focus on the NREL-hosted Industry Growth Forum, and how it helps cleantech startups secure funding and transfer their technology to market.

  3. Decision Support and Risk Management

    E-Print Network [OSTI]

    and emergency management officials during the planning, incident management preparedness, and response phasesDecision Support and Risk Management CVMDM: Community Vaccination and Mass Dispensing Model What and the performance of prophylaxis supply logistics and PODs. Decision and Information Sciences Division Decision

  4. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  5. Institutional plan. FY 1997-2002

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  6. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    Spencer, Charles G

    2012-12-01T23:59:59.000Z

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.

  7. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition...

  8. 1. A vertical post 2.5-meters high must support a lateral load P = 12 kN at its upper end. Two plans are proposed -a solid wood post and a hollow aluminum tube. (a)

    E-Print Network [OSTI]

    Huang, Haimei

    plans are proposed -a solid wood post and a hollow aluminum tube. (a) What is the minimum required is the minimum diameter d2of the aluminum tube if its wall thickness is to be one-eight of the outer diameter and the allowable bending stress in the aluminum is 50Mpa ? (20 points) 2. The composite beam shown in figure below

  9. Proactive Planning

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    , rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

  10. FY95 capital asset implementation plan

    SciTech Connect (OSTI)

    Not Available

    1994-12-01T23:59:59.000Z

    The Waste Isolation Division (WID) is committed to providing good stewardship for the capital assets under its operational and physical control. To achieve this goal, the WID has developed the Capital Asset Implementation Plan (CAIP) to continue to implement for FY95 Department of Energy (DOE) Order 4320.2A, Capital Asset Management Process (CAMP). The Order provides policy and elements needed to establish a credible, consistent, auditable, and technically sound process for the DOE to forecast, plan, and budget for capital assets on a functional unit level. The objective of the WIPP CAMP program is to meet the goals of DOE Order 4320.2A in the most effective and efficient manner possible in support of the Waste Isolation Pilot Plant (WIPP) mission. As a result, this CAIP provides a way to implement the CAMP Program using a graded approach. Continued implementation will be accomplished by improving the existing process, and establishing future goals to promote growth for the CAMP Program. The CAIP is issued annually by the WID with quarterly progress reports submitted to the DOE. This document describes the current-year program staffing, roles, responsibilities, funding, and near-term milestones. In addition, the results of past goals are discussed.

  11. CORPORATE AND STRATEGIC PLANNING Faculty planning workbook

    E-Print Network [OSTI]

    .............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

  12. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01T23:59:59.000Z

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  13. Houston-Galveston Region Public Transportation Coordination Plan

    E-Print Network [OSTI]

    Houston-Galveston Area Council

    2005-11-17T23:59:59.000Z

    Metropolitan Planning Organization supporting transportation and air quality planning in the eight county metropolitan area. H-GAC also serves as the Area Agency on Aging for 12 of its 13 counties and administers the workforce training program for the 13... Metropolitan Planning Organization supporting transportation and air quality planning in the eight county metropolitan area. H-GAC also serves as the Area Agency on Aging for 12 of its 13 counties and administers the workforce training program for the 13...

  14. ICDF Complex Operations Waste Management Plan

    SciTech Connect (OSTI)

    W.M. Heileson

    2006-12-01T23:59:59.000Z

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  15. assurance project plans: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and water resources, while supporting the Pecos River Compact by delivering water to Texas 4. Project Objectives: Planning for a possible candidate conservation agreement will...

  16. assurance project plan: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and water resources, while supporting the Pecos River Compact by delivering water to Texas 4. Project Objectives: Planning for a possible candidate conservation agreement will...

  17. 2012 Annual Workforce Analysis and Staffing Plan Report - TEMPLATE

    Broader source: Energy.gov (indexed) [DOE]

    for its Major System Acquisitions, including MOX, and is still developing strategic workforce planning for how it will fill staffing needs (e.g. federal versus support...

  18. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans Medical Plans

  19. Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic Plan The strategic planning process1/7/2010

  20. U.S. OPEN DATA ACTION PLAN May 9, 2014

    E-Print Network [OSTI]

    Schrijver, Karel

    U.S. OPEN DATA ACTION PLAN May 9, 2014 #12;U.S. OPEN DATA ACTION PLAN 1 Licensing As a work.0 Universal Public Domain Dedication. #12;U.S. OPEN DATA ACTION PLAN 2 Introduction Throughout his, improve accountability, and fuel private sector innovation, scientific discovery, and economic growth

  1. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01T23:59:59.000Z

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  2. NORTHWESTERN UNIVERSITY Information Technology Strategic Plan

    E-Print Network [OSTI]

    Shull, Kenneth R.

    conferencing technology into the Course Management System, allowing for virtual office hours, easier access mobile device and tablet support to core services of the Course Management SyNORTHWESTERN UNIVERSITY Information Technology Strategic Plan 2012 2014 #12;Information technology

  3. Certification plan for reactor analysis computer codes

    SciTech Connect (OSTI)

    Toffer, H.; Crowe, R.D.; Schwinkendorf, K.N. [Westinghouse Hanford Co., Richland, WA (United States); Pevey, R.E. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1990-01-01T23:59:59.000Z

    A certification plan for reactor analysis computer codes used in Technical Specifications development and for other safety and production support calculations has been prepared. An action matrix, checklists, a time schedule, and a resource commitment table have been included in the plan. These items identify what is required to achieve certification of the codes, the time table that this will be accomplished on, and the resources needed to support such an effort.

  4. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect (OSTI)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01T23:59:59.000Z

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  5. SB 375 IMPLEMENTATION: FROM PLAN TO REALITY

    E-Print Network [OSTI]

    California at Davis, University of

    Development Cross-Agency Facilitation and Coordination Funding and Support for Sustainable Communities sustainable communities in a post-SB 375 world. · Urban Greening: $41.5 million in capital projects and plans Planning - Guidance documents - Metrics and indicators - Connecting dots across state agencies - Building

  6. SNL/CA Cultural Resources Management Plan.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2005-11-01T23:59:59.000Z

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  7. SNF project engineering process improvement plan

    SciTech Connect (OSTI)

    DESAI, S.P.

    1999-07-13T23:59:59.000Z

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999.

  8. Update on BNL's Solar Energy Research Plans

    E-Print Network [OSTI]

    Homes, Christopher C.

    Update on BNL's Solar Energy Research Plans Presented to CAC by Bob Lofaro January 12, 2012 #12;2 First, BP Solar is going out of business, but this will not impact BNL's plans for solar energy research! BP Solar will meet all of its contractual commitments with regard to supporting BNL's solar energy

  9. Partial Support for the Federal Committee for Meteorological Services and Supporting Research

    SciTech Connect (OSTI)

    Williamson, Samuel P

    2012-04-30T23:59:59.000Z

    DOE E-link Report Number DOE/ER62778 1999-2012 Please see attached Final Technical Report (size too large to post here). Annual Products Provided to DOE: Federal Plan for Meteorological Services and Supporting Research; National Hurricane Operations Plan; Interdepartmental Hurricane Conference Summary Report. All reports and publications can be found on the OFCM website, www.ofcm.noaa.gov.

  10. Plan Your School Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit...

  11. Milestone Plan Process Improvement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the...

  12. Energy planning and management plan

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  13. Jonesboro Metropolitan Planning Organization 2030 Long Range Transportation Plan

    E-Print Network [OSTI]

    Jonesboro Metropolitan Planning Organization

    , and on the MPO website with instructions for making public comments. A final public involvement meeting was held September 27, 2005 as the special Policy Committee meeting in the Transportation Conference Room, City of Jonesboro, 519 West Washington Avenue... Transportation Plan 2-3 Chapter 2 Existing Conditions B. Employment Economic growth and an increase in employment have implications for the region's transportation system. The increase in industrial development makes access to these sites a key issue...

  14. Lafayette Metropolitan Planning Organization 2030 Transportation Plan

    E-Print Network [OSTI]

    Lafayette Metropolitan Planning Organization

    2010-10-31T23:59:59.000Z

    And Development Lafayette Metropolitan Planning Organization 2030 Transportation Plan DRAFT FINAL REPORT Prepared by Neel-Schaffer, Inc... ? 2020 DEFICIENCIES ........................................................................................... 51 FIGURE 11 ? 2030 DEFICIENCIES ........................................................................................... 52 FIGURE 12...

  15. Maps and Plans

    E-Print Network [OSTI]

    Rose, Thomas

    2008-01-01T23:59:59.000Z

    shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

  16. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  17. A Spatial Planning and Analysis System for Wildland Fire Management

    E-Print Network [OSTI]

    STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

  18. SOCAP: System for Operations Crisis Action Planning Marie A. Bienkowski

    E-Print Network [OSTI]

    Wilkins, David E.

    ), to the problem of generating crisis action operations plans in a joint military domain* . We describe our technology to the general problem of planning and executing joint military operations including supporting or development activity has integrated a generative planning system into an operational military environment

  19. SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning

    E-Print Network [OSTI]

    Squire, Larry R.

    Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

  20. Crisis Management Planning: A Case Study of Man-Made and Natural Crisis Events in Higher Education

    E-Print Network [OSTI]

    Booker, Lonnie J.

    2012-02-14T23:59:59.000Z

    , and leadership roles during a crises. The findings support the importance of developing a crisis management plan, disseminating the plan to all stakeholders, and application of continuous learning principles to evaluate the plan and actual crises responses...

  1. SJSU HR: revised 01/13/12 Page 1 of 2 TEMPORARY SUPPORT REQUEST

    E-Print Network [OSTI]

    Eirinaki, Magdalini

    SJSU HR: revised 01/13/12 Page 1 of 2 TEMPORARY SUPPORT REQUEST HUMAN RESOURCES Workforce Planning FOR TEMPORARY SUPPORT Complete and submit this form to Workforce Planning (WFP) at classcomp@sjsu.edu or 0046 consultation with Workforce Planning. GENERAL INFORMATION University Division: Academic Affairs Administration

  2. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design Passive SolarCenterYou are here: SN Home page|Plans,

  3. Program Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins GeraldDuncan McBranchProgram Planning at

  4. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan Print

  5. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan

  6. Venus Technology Plan Venus Technology Plan

    E-Print Network [OSTI]

    Rathbun, Julie A.

    Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

  7. Page 1Forestry Commission England Corporate Plan 2012-13 Corporate Plan

    E-Print Network [OSTI]

    Page 1Forestry Commission England Corporate Plan 2012-13 Corporate Plan 2012-13 #12;Page 2Forestry the environment and supporting a strong green economy, and the Forestry Commission is well placed to contribute toward this. The recent report from the Forestry Regulation Task Force highlighted the need to make

  8. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29T23:59:59.000Z

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  9. EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014

    SciTech Connect (OSTI)

    Shane Bush

    2014-09-01T23:59:59.000Z

    This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.

  10. Asotin Creek Model Watershed Plan

    SciTech Connect (OSTI)

    Browne, D.; Holzmiller, J.; Koch, F.; Polumsky, S.; Schlee, D.; Thiessen, G.; Johnson, C.

    1995-04-01T23:59:59.000Z

    The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon``. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity. The watershed coordinator for the Asotin County Conservation District led a locally based process that combined local concerns and knowledge with technology from several agencies to produce the Asotin Creek Model Watershed Plan.

  11. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01T23:59:59.000Z

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  12. 2030 OCARTS Plan Report

    E-Print Network [OSTI]

    Association of Central Oklahoma Governments

    ......................................Director of Planning & Program Development Pearlie Tiggs................................................................... Community Planner 2030 OCARTS Plan Report Table of Contents PART 1 INTRODUCTION........................................................................ 1 Federal Legislation.......................................................................... 1 Purpose of the Plan Report and Relationship to other Plan Documents............. 3 Organization of the Transportation Planning Process...

  13. Buried Waste Integrated Demonstration Plan

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01T23:59:59.000Z

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  14. Economic Redevelopment and Growth Program (New Jersey)

    Broader source: Energy.gov [DOE]

    Economic Redevelopment and Growth program (ERG) is an incentive for real estate development projects that have a financing gap, defined as having insufficient revenues to support the project debt...

  15. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01T23:59:59.000Z

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  16. Waste classification sampling plan

    SciTech Connect (OSTI)

    Landsman, S.D.

    1998-05-27T23:59:59.000Z

    The purpose of this sampling is to explain the method used to collect and analyze data necessary to verify and/or determine the radionuclide content of the B-Cell decontamination and decommissioning waste stream so that the correct waste classification for the waste stream can be made, and to collect samples for studies of decontamination methods that could be used to remove fixed contamination present on the waste. The scope of this plan is to establish the technical basis for collecting samples and compiling quantitative data on the radioactive constituents present in waste generated during deactivation activities in B-Cell. Sampling and radioisotopic analysis will be performed on the fixed layers of contamination present on structural material and internal surfaces of process piping and tanks. In addition, dose rate measurements on existing waste material will be performed to determine the fraction of dose rate attributable to both removable and fixed contamination. Samples will also be collected to support studies of decontamination methods that are effective in removing the fixed contamination present on the waste. Sampling performed under this plan will meet criteria established in BNF-2596, Data Quality Objectives for the B-Cell Waste Stream Classification Sampling, J. M. Barnett, May 1998.

  17. LANL continuity of operations plan

    SciTech Connect (OSTI)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22T23:59:59.000Z

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

  18. Management Plan Supplement Yakima Subbasin Plan

    E-Print Network [OSTI]

    #12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

  19. Flushing sprawl down the drain : is TIF an option for Vermont growth center wastewater projects?

    E-Print Network [OSTI]

    Markarian, Molly E. (Molly Elizabeth)

    2007-01-01T23:59:59.000Z

    In keeping with a long history of striving to preserve its traditional settlement pattern and promote smart growth, Vermont's most recent growth management policies encourage municipalities to plan for and accommodate ...

  20. Air Risk Information Support Center

    SciTech Connect (OSTI)

    Shoaf, C.R.; Guth, D.J. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31T23:59:59.000Z

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1 ref., 2 figs.

  1. Strategic Energy Planning Webinar

    Broader source: Energy.gov [DOE]

    Attendees will learn about developing a strategic energy plan, identifying key aspects of successful energy planning, and using available information and resources, including archived webinars in...

  2. Accidental Death & Dismemberment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

  3. Strategic Health Workforce Planning

    E-Print Network [OSTI]

    2013-05-11T23:59:59.000Z

    May 11, 2013 ... Health workforce planning plays a key role in the United States and ... workforce plans should account for lags implied by training new ...

  4. Powering the people: India's capacity expansion plans

    SciTech Connect (OSTI)

    Patel, S.

    2009-05-15T23:59:59.000Z

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  5. Jump to first page American Planning Association

    E-Print Network [OSTI]

    to first page How Smart is your Community? Small group exercise 5. CENTRAL CITY VITALITY Examples: GradeJump to first page American Planning Association Core Smart Growth Principles 1) INCREASED CITIZEN, adaptive re-use) 5) CENTRAL CITY VITALITY 6) GREATER MIX OF USES AND HOUSING CHOICES FOCUSED AROUND HUMAN

  6. Flexible design : an innovative approach for planning water infrastructure systems under uncertainty

    E-Print Network [OSTI]

    Wong, Melanie Kathleen

    2013-01-01T23:59:59.000Z

    This thesis develops a framework for a flexible design approach to support decision-making in water supply infrastructure planning. It contrasts with a conventional, deterministic planning approach that uses past data or ...

  7. The Climate Change Action Plan: Technical supplement

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  8. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01T23:59:59.000Z

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.

  9. Motion Planning ! Jana Kosecka!

    E-Print Network [OSTI]

    Kosecka, Jana

    1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

  10. Climate change action plan

    E-Print Network [OSTI]

    Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

  11. Intermountain Province Subbasin Plan

    E-Print Network [OSTI]

    , and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

  12. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    SciTech Connect (OSTI)

    T. Haney

    2007-07-31T23:59:59.000Z

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  13. Economic Growth Policies & Economic Growth Theory Influences.

    E-Print Network [OSTI]

    Hallden, Sophie

    2012-01-01T23:59:59.000Z

    ?? The aim of this thesis is to describe the presence of theories for economic growth in municipalities’ economic growth strategies, and to compare the… (more)

  14. State Support of Domestic Production

    SciTech Connect (OSTI)

    Amy Wright

    2007-12-30T23:59:59.000Z

    This project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under the State Support of Domestic Production DE-FC26-04NT15456. The Interstate Oil and Gas Compact Commission (IOGCC) performed efforts in support of State programs related to the security, reliability and growth if our nation's domestic production of oil and natural gas. The project objectives were to improve the States ability to monitor the security of oil and gas operations; to maximize the production of domestic oil and natural gas thereby minimizing the threat to national security posed by interruptions in energy imports; to assist States in developing and maintaining high standards of environmental protection; to assist in addressing issues that limit the capacity of the industry; to promote the deployment of the appropriate application of technology for regulatory efficiency; and to inform the public about emerging energy issues.

  15. Satellite imagery can support water planning in the Central Valley

    E-Print Network [OSTI]

    Zhong, Liheng; Hawkins, Tom; Holland, Kyle; Gong, Peng; Biging, Gregory S

    2009-01-01T23:59:59.000Z

    area, Merced County County Fresno Kings Merced Sutter Timethe study area Merced County. Kings, Merced and Sutter (fig.counties are par- ticularly important to the agricultural economy of the Central Valley: Fresno, Fresno Kings

  16. HelpMe Telecom - Service Support Organization (SSO) Operating Plan

    E-Print Network [OSTI]

    Bhojwani, Sunil

    2005-12-16T23:59:59.000Z

    pace with technology changes over the years, yet with improving supplier?s systems, SSO can achieve significant improvements without having to rely on extensive system modifications. It is the process analysis aspect that provided the most insight...: Short-term Operational Improvements Long-Term Value Creation ? Hire additional contractors to clear current order backlog. ? Identify Subject-Matter-Experts (SMEs), and delegate problem resolution. ? Create robust training process...

  17. AWARD FEE PLAN FOR Facility Support Services Contract (Wastren...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    contractor on day one of the contract. 7. Environmental Safety, Health, and Quality (ESH&Q) (All Performance Categories) Ll A. OSHA Total Recordable Case (TRC) B. Days Away...

  18. Mission planning and navigation support for lunar and planetary exploration

    E-Print Network [OSTI]

    Essenburg, Joseph R

    2008-01-01T23:59:59.000Z

    When mankind returns to the moon and eventually voyages to Mars, the ability to effectively carry out surface extra-vehicular activities (EVAs) ill be critical to overall mission success. This thesis investigates improving ...

  19. Designing Snakey: A Tangible User Interface Supporting Well Path Planning

    E-Print Network [OSTI]

    is a fundamental task present in different stages of oil/gas field development from early exploration to production intuitive manipulation and interaction with 3D curves, common to underground well path exploration, but rather to augment them with tangible and collaborative interaction, facilitating spatial exploration

  20. Democratic Republic of Congo-National Adaptation Plan Global Support

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump to:52c8ff988c1 No38e4011f618bDeer Park,DellProgramme (LECBP) | OpenProgramme

  1. Mission Support Contract Performance Evaluation and Measurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program PreliminaryA3,0Statements | National4 Task Order2632

  2. CLEAN-Linking International Instruments to Support Low Emission Planning

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWendeGuo FengBoulder, CO)Burundi: EnergyCECGSeries Jump

  3. Central African Republic-National Adaptation Plan Global Support Programme

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWendeGuoCatalyst Renewables JumpView formDemonstration

  4. INDIAN INSTITUTE OF TECHNOLOGY BOMBAY DEAN (INFRASTRUCTURE PLANNING SUPPORT)

    E-Print Network [OSTI]

    Narayanan, H.

    &ADMINISTRATIVE PERSONNEL TO BE EMPLOYED FOR THE WORK 16 10 FORM `F-A'-DETAILS OF CONSULTANCY EQUIPMENT LIKELY TO BE USED of transmittal and forms for pre-qualification are given in Section III. 1.2 All information called by neatly crossing out, initialling, dating and rewriting. Pages of the pre-qualification document

  5. Project Execution Plan, Rev. 3

    SciTech Connect (OSTI)

    IT Corporation, Las Vegas

    2002-08-01T23:59:59.000Z

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls.

  6. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26T23:59:59.000Z

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  7. Systematic Approach for Decommissioning Planning and Estimating

    SciTech Connect (OSTI)

    Dam, A. S.

    2002-02-26T23:59:59.000Z

    Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

  8. Support Services Specialist

    Broader source: Energy.gov [DOE]

    This position is located in Printing and Mail Services, Operations and Planning, Workplace Services, Internal Business Services. Additional vacancies may be filled through this vacancy announcement...

  9. Hazardous Waste Compliance Program Plan

    SciTech Connect (OSTI)

    Potter, G.L.; Holstein, K.A.

    1994-05-01T23:59:59.000Z

    The Hazardous Waste Compliance Program Plan (HWCPP) describes how the Rocky Flats Plant institutes a more effective waste management program designed to achieve and maintain strict adherence to the Resource Conservation and Recovery Act (RCRA) requirements. Emphasis is given to improve integration of line operations with programmatic and functional support activities necessary to achieve physical compliance to RCRA regulated equipment, facilities and operations at the floor level. This program focuses on specific activities occurring or which need to occur within buildings containing RCRA regulated units and activities. The plan describes a new approach to achieving and maintaining compliance. This approach concentrates authority and accountability for compliance with the line operating personnel, with support provided from the programmatic functions. This approach requires a higher degree of integration and coordination between operating and program support organizations. The principal changes in emphases are; (1) increased line operations involvement, knowledge and accountability in compliance activities, (2) improved management systems to identify, correct and/or avoid deficiencies and (3) enhanced management attention and employee awareness of compliance related matters.

  10. Fiscal Year 2006 Washington Closure Hanford Science & Technology Plan

    SciTech Connect (OSTI)

    K.J. Kroegler, M. Truex, D.J. McBride

    2006-01-19T23:59:59.000Z

    This Washington Closure Hanford science and technology (S&T) plan documents the activities associated with providing S&T support to the River Corridor Closure Project for fiscal year 2006.

  11. The Commonwealth Electric Open Planning Project : final report

    E-Print Network [OSTI]

    Andrews, Clinton J.

    1991-01-01T23:59:59.000Z

    This report describes the development, application and results of an Open Planning Process performed by the M.I.T. Energy Laboratory's Analysis Group for Regional Electricity Alternatives (AGREA) for, and with the support ...

  12. TEXASU R B A N T R I A N G L E Framework for future growth

    E-Print Network [OSTI]

    of Landscape Architecture and Urban Planning The Sustainable Urbanism Seminar and the Applied Planning StudioTEXASU R B A N T R I A N G L E Framework for future growth Sustainable Urbanism, Plan 675, Spring of the Department of Landscape Architecture and Urban Planning of Texas A&M University is pleased to present

  13. Executive Budget Support Team Office of the President

    E-Print Network [OSTI]

    Jacobs, Laurence J.

    Executive Budget Support Team Office of the President Provost / Executive Vice President Institute Budget Planning & Admin. Jim Kirk Asst Budget Director Vacant Sr. Budget Analyst Ebony Thompson Budget Development & Capital Budgets Director Lisa Godfrey Systems Support Engr II Vacant Sr. Budget

  14. A consultation on Forestry Commission support for sustainable woodland management in England

    E-Print Network [OSTI]

    A consultation on Forestry Commission support for sustainable woodland management in England planning Support for forestry contractors Advice and training for owners and managers Grant support to look again at the way the Forestry Commission supports sustainable woodland management in England

  15. Decision Support for IntegratedDecision Support for Integrated WaterWater--Energy PlanningEnergy Planning

    E-Print Network [OSTI]

    Keller, Arturo A.

    Courtesy of Energy-Water Nexus Energy for Water · Pumping · Treatment · Distribution Water for Energy

  16. Project Plan UC Online Education (UCOE)

    E-Print Network [OSTI]

    Becker, Luann

    of Contents I. PROJECT DESCRIPTION II. COST REVENUE MODEL AND FINANCIAL FORECAST III. INCENTIVES1 Project Plan UC Online Education (UCOE) March 24, 2011 Office of the President SUPPORTING CAMPUS AND FACULTY PARTICIPATION IV. RISKS AND RISK MANAGEMENT V. PROJECT ORGANIZATION

  17. Utility planning tools catalog. Final report

    SciTech Connect (OSTI)

    Diamond, M.

    1985-02-01T23:59:59.000Z

    Planning methods new to the industry can help utilities steer a sound course in today's complex business environment. This catalog offers an overview of 23 innovative techniques drawn from other industries. The tools selected focus on supporting strategic analysis and decision making for utilities.

  18. STUDENT LEARNING COMMONS PLANNING 2007-2010

    E-Print Network [OSTI]

    STUDENT LEARNING COMMONS PLANNING 2007-2010 Elaine Fairey, Director, Student Learning Commons Lynn delivery 4. Space 5. Internal relations 6. External relations Introduction The Student Learning Commons (SLC) was created in response to the report on Student Learning Support Services (October 2004

  19. Water quality management plan for Cherokee Reservoir

    SciTech Connect (OSTI)

    Not Available

    1984-01-01T23:59:59.000Z

    The management plan provides an assessment of Cherokee Reservoir's current water quality, identifies those factors which affect reservoir water quality, and develops recommendations aimed at restoring or maintaining water quality at levels sufficient to support diverse beneficial uses. 20 references, 8 figures, 15 tables. (ACR)

  20. Contributed Paper Biodiversity Conservation in Local Planning

    E-Print Network [OSTI]

    Miller, James R.

    Contributed Paper Biodiversity Conservation in Local Planning JAMES R. MILLER, MARTHA GROOM-use policy is increasingly being recognized as fundamental to biodiversity conservation in the United States to support the conservation of biodiversity at local scales. Yet little is known about the pervasiveness

  1. 65 Contingency Planning Issues CONTINGENCY PLANNING ISSUES

    E-Print Network [OSTI]

    . The plan relies on a mixed strategy response to an energy shortage. The plan uses a free market approach to local jurisdic- tions, economic considerations, revisions to the California Energy Shortage Contingency multiple jurisdictions or agencies. LOCAL GOVERNMENT ASSISTANCE PROGRAM The purpose of the Energy

  2. John Dempsey Hospital John Dempsey Hospital Patient Safety Plan

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Safety Plan supports the mission and vision of the University of Connecticut Health Center as well Patient Safety Plan provides a systematic approach to the maintenance and improvement of patient safety a culture of High Reliability · Use best practice models for safe patient care throughout JDH TACTICS: JDH

  3. Defined Contribution Pensions: Plan Rules, Participant Choices, and the

    E-Print Network [OSTI]

    Chen, Yiling

    Defined Contribution Pensions: Plan Rules, Participant Choices, and the Path of Least Resistance support from the MacArthur Foundation and the Sloan Foundation. #12;2 Defined Contribution Pensions: Plan Rules, Participant Choices, and the Path of Least Resistance Abstract: We assess the impact on savings

  4. 384 Power plant waste water sampling and analysis plan

    SciTech Connect (OSTI)

    Hagerty, K.J.; Knotek, H.M.

    1995-01-01T23:59:59.000Z

    This document presents the 384 Power House Sampling and Analysis Plan. The Plan describes sampling methods, locations, frequency, analytes, and stream descriptions. The effluent streams from 384, were characterized in 1989, in support of the Stream Specific Report (WHC-EP-0342, Addendum 1).

  5. BUSINESS CONTINUITY PLANNING RESOURCES FOR SMALL-AND MEDIUM-

    E-Print Network [OSTI]

    BUSINESS CONTINUITY PLANNING RESOURCES FOR SMALL- AND MEDIUM- SIZED BUSINESSES May 2010 Prepared and supported by the Northwest Regional Technology Center for Homeland Security Business Continuity Planning Resources for Small- and Medium- Sized Businesses KS Judd AM Lesperance May 14, 2010 #12;DISCLAIMER

  6. Carlsbad Area Office strategic plan

    SciTech Connect (OSTI)

    NONE

    1995-10-01T23:59:59.000Z

    This edition of the Carlsbad Area Office Strategic Plan captures the U.S. Department of Energy`s new focus, and supercedes the edition issued previously in 1995. This revision reflects a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on the selected combination of scientific investigations, engineered alternatives, and waste acceptance criteria for supporting the compliance applications. An overview of operations and historical aspects of the Waste Isolation Pilot Plant near Carlsbad, New Mexico is presented.

  7. E-Print Network 3.0 - army aviation support Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for a new runway at each... support for bringing aviation into the European emissions trading scheme (Clasper, 2004; Jowett, 2004... Growth scenarios for EU & UK aviation:...

  8. Reactor vessel support system

    DOE Patents [OSTI]

    Golden, Martin P. (Trafford, PA); Holley, John C. (McKeesport, PA)

    1982-01-01T23:59:59.000Z

    A reactor vessel support system includes a support ring at the reactor top supported through a box ring on a ledge of the reactor containment. The box ring includes an annular space in the center of its cross-section to reduce heat flow and is keyed to the support ledge to transmit seismic forces from the reactor vessel to the containment structure. A coolant channel is provided at the outside circumference of the support ring to supply coolant gas through the keyways to channels between the reactor vessel and support ledge into the containment space.

  9. Motion Planning Jana Kosecka

    E-Print Network [OSTI]

    Kosecka, Jana

    Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

  10. Planning the Project Meeting

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

  11. Sustainabiliity Sustainability Plan

    E-Print Network [OSTI]

    Heller, Barbara

    Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

  12. Hoisting & Rigging Lift Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 3 of 3 Guidelines for Generating a Rigging Sketch The lift plan required a rigging sketch or...

  13. Natural Gas Multi-Year Program Plan

    SciTech Connect (OSTI)

    NONE

    1997-12-01T23:59:59.000Z

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  14. Training Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

  15. Waste Management Quality Assurance Plan

    E-Print Network [OSTI]

    Waste Management Group

    2006-01-01T23:59:59.000Z

    Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

  16. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  17. Multiperiod Refinery Planning Optimization

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Multiperiod Refinery Planning Optimization with Nonlinear CDU Models Abdulrahman Alattas, Advisor #12;Refinery Planning Model Development 2 Extension to Multiperiod Planning #12;3 Multiperiod Refinery: refinery configuration Determine · What crude oil to process and in which time period? · The quantities

  18. University Libraries Technology Plan

    E-Print Network [OSTI]

    Moore, Paul A.

    Libraries Bowling Green State University #12;Table of Contents Introduction ..................................................................19 Page 2 of 19 Technology Plan, 2003-2005 University Libraries Bowling Green State University #12University Libraries Technology Plan 2003-2005 Page 1 of 19 Technology Plan, 2003-2005 University

  19. University of Operations Plan

    E-Print Network [OSTI]

    Firestone, Jeremy

    Management Plan Office of Campus and Public Safety University of Delaware Critical Incident Management Plan Management Plan Office of Campus and Public Safety - 4 - University of Delaware Critical Incident Management and Public Safety - 5 - County of New Castle CD-30 911 Center/Communications CD-31 Department of Police CD-32

  20. Motion Planning Jana Kosecka

    E-Print Network [OSTI]

    Kosecka, Jana

    1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

  1. Corporate and Business Plan

    E-Print Network [OSTI]

    Corporate and Business Plan 2010-2011 #12;Main addresses Forest Research Alice Holt Lodge Farnham Research's Business Plan 2010-2011 ..........................12 Table Contents Table 1 - Income This Corporate and Business Plan sets out FR's aims and strategic objectives. It describes the Key Performance

  2. Enabling Services Dyslexia Support

    E-Print Network [OSTI]

    Anderson, Jim

    Enabling Services Dyslexia Support information for students website: www.soton.ac.uk/edusupport/dyslexia, George Thomas Building (37), Highfield Campus #12;2 Contents About Dyslexia Support.........................................................11 National and Local Organisations: .....................................12 #12;3 About Dyslexia

  3. Brazil-Green Growth Strategy Support | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Area Solar EnergyBradbury,Brayton Energy LLC Jump to:(CTI

  4. South Korea-Green Growth Strategy Support | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland, Illinois: Energy Resources Jump to:Maryland:Northeast

  5. GGGI-Ethiopia-Green Growth Strategy Support | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, search Equivalent URIFrontier,Jump to:Wilmette, Jump to:SOURCE

  6. Ghana-Supporting Low Carbon Growth | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, searchGeaugaInformation MexicoLLC Jump

  7. Indonesia-Green Growth Strategy Support | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (bot load) Error 429Indiana WindIndonesia| Open

  8. Ghana-Supporting Low Carbon Growth | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power BasicsGermany: Energy Resources Jump to: navigation,Energylow carbon

  9. Emergency Medical Support

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume defines coordination between emergency planners and emergency medical support. Canceled by DOE G 151.1-4.

  10. LBNL Institutional Plan, FY 1996--2001. Draft

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  11. Enabling Services Dyslexia Support

    E-Print Network [OSTI]

    Anderson, Jim

    Enabling Services Dyslexia Support Information for students Support for students with specific learning difficulties such as dyslexia and dyspraxia Email: enable@soton.ac.uk Tel: 023 8059 7726 Student Services Centre Building (37) Highfield Campus #12;2 Contents About Dyslexia Support

  12. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    SciTech Connect (OSTI)

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01T23:59:59.000Z

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  13. Business Plans for Agricultural Producers

    E-Print Network [OSTI]

    McCorkle, Dean; Bevers, Stan

    2008-10-17T23:59:59.000Z

    Natural resources Z Strengths, weaknesses, opportunities ? and threats (SWOT) Mission statement ? Objectives and goals ? Production plan ? Financial plan ? Market plan ? Legal and liability issues ? Insurance ? Succession and estate planning...

  14. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

  15. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

  16. Supported microporous ceramic membranes

    DOE Patents [OSTI]

    Webster, Elizabeth (Madison, WI); Anderson, Marc (Madison, WI)

    1993-01-01T23:59:59.000Z

    A method for permformation of microporous ceramic membranes onto a porous support includes placing a colloidal suspension of metal or metal oxide particles on one side of the porous support and exposing the other side of the porous support to a drying stream of gas or a reactive gas stream so that the particles are deposited on the drying side of the support as a gel. The gel so deposited can be sintered to form a supported ceramic membrane useful for ultrafiltration, reverse osmosis, or molecular sieving having mean pore sizes less than 100 Angstroms.

  17. Supported microporous ceramic membranes

    DOE Patents [OSTI]

    Webster, E.; Anderson, M.

    1993-12-14T23:59:59.000Z

    A method for the formation of microporous ceramic membranes onto a porous support includes placing a colloidal suspension of metal or metal oxide particles on one side of the porous support and exposing the other side of the porous support to a drying stream of gas or a reactive gas stream so that the particles are deposited on the drying side of the support as a gel. The gel so deposited can be sintered to form a supported ceramic membrane useful for ultrafiltration, reverse osmosis, or molecular sieving having mean pore sizes less than 100 Angstroms. 4 figures.

  18. Student Affairs Supporting the Vision of UC Davis

    E-Print Network [OSTI]

    Ferrara, Katherine W.

    Student Affairs Supporting the Vision of UC Davis Annual Report, 2010-2011 #12;STUDENT AFFAIRS · ANNUAL REPORT 2010-2011 1 Student Affairs: Supporting a Vision of Excellence Broad opportunities to encourage student growth and development The Division of Student Affairs dedicates itself to advancing

  19. Alumna's Generosity Supports Students

    E-Print Network [OSTI]

    Soloveichik, David

    in 1927 opened Disernia's Pharmacy on Mission and Precita Streets. He aspired to one day take over, etc.) h Stock/Mutual Fund h Life Income Plan (i.e., Charitable Trust, Gift Annuity, Pooled Fund

  20. INL Portal Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planned Monthly Maintenance The INL Portal may temporarily be down between 6:00 PM MST and 10:00 PM MST on the third Thursday of each month for server maintenance....

  1. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

  2. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  3. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01T23:59:59.000Z

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  4. Independent Scientific Advisory Board for the Northwest Power Planning Council

    E-Print Network [OSTI]

    An Analysis of Decision Support Tools Used in Columbia River Basin Salmon Management Executive Summary March 2 in the Columbia Basin include NMFS' Cumulative Risk Initiative (CRI), the Plan for Analysis and Testing Hypotheses available for decision support in Columbia Basin salmon management. These philosophies are: (1) decision-analysis

  5. FALL/WINTER 2011 11 great deal of planning is required

    E-Print Network [OSTI]

    Gupta, Diwakar

    of the needed transit trips for a given day. Extraboard-Driver Workforce Planning for Bus Transit Operations that help monitor bus transit workforce efficiency and support better transit workforce planning; to analyzeFALL/WINTER 2011 11 A great deal of planning is required to provide safe and reliable bus service

  6. High performance computing and communications: FY 1997 implementation plan

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  7. Designing for an Informal Learning Environment: Towards a Participatory Simulation Design Process for Public Policy Planning

    E-Print Network [OSTI]

    Lyons, Leilah

    to stakeholders. Means ­ Tools & processes to support stakeholder participation Unlike Decision Support Systems Sciences1 , Comp. Sci.2 , Urban Plan. & Policy3 , Inst. for Env. Sci. & Policy4 University of Illinois and the outcomes of the system. Introduction Watershed planning brings together diverse representatives (e.g. local

  8. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    Sherry, T. D.; Kohlhorst, D. P.; Little, S. K.

    2011-12-01T23:59:59.000Z

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the DOE and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the Guiding Principles. Specifically, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP) while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. Table ES.2 gives a comprehensive overview of Y-12's performance status and planned actions. B&W Y-12's Energy Management mission is to incorporate renewable energy and energy efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. During FY 2011, the site formed a sustainability team (Fig. ES.1). The sustainability team provides a coordinated approach to meeting the various sustainability requirements and serves as a forum for increased communication and consistent implementation of sustainability activities at Y-12. The sustainability team serves as an information exchange mechanism to promote general awareness of sustainability information, while providing a system to document progress and to identify resources. These resources are necessary to implement activities that support the overall goals of sustainability, including reducing the use of resources and conserving energy. Additionally, the team's objectives include: (1) Foster a Y-12-wide philosophy to conserve resources; (2) Reduce the impacts of production operations in a cost-effective manner; (3) Increase materials recycling; (4) Use a minimum amount of energy and fuel; (5) Create a minimum of waste and pollution in achieving Y-12-strategic objectives; (6) Develop and implement techniques, technologies, process modifications, and programs that support sustainable acquisition; (7) Minimize the impacts to resources, including energy/fuel, water, waste, pesticides, and pollution generation; (8) Incorporate sustainable design principles into the design and construction of facility upgrades, new facilities, and infrastructure; and (9) Comply with federal and state regulations, executive orders, and DOE requirements. Y-12 is working to communicate its sustainment vision through procedural, engineering, operational, and management practices. The site will make informed decisions based on the application of the five Guiding Principles for HPSBs to the maximum extent possible.

  9. 24 Command Fire Improvement Action Program Plan

    SciTech Connect (OSTI)

    GRIFFIN, G.B.

    2000-12-01T23:59:59.000Z

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  10. Global Nuclear Energy Partnership Technology Development Plan

    SciTech Connect (OSTI)

    David J. Hill

    2007-07-01T23:59:59.000Z

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  11. TWRS privatization phase 1 master site plan

    SciTech Connect (OSTI)

    Parazin, R.J.

    1996-09-30T23:59:59.000Z

    The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called `privatization` and includes design, permitting, construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub-projects which will provide key services needed to support the privatization mission. This master site plan presently describes all pertinent aspects of the site and identifies all planned provisions for site development, utilities and other site services. It is a baseline document which will be revised as privatization proceeds through design, construction and start-up.

  12. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    SciTech Connect (OSTI)

    Beggs, S.D.

    2000-12-07T23:59:59.000Z

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes strategic plans for human resources; environmental protection, safety, and health; site and facilities; security, export control, and counterintelligence; information management; communications, outreach, and community affairs; performance-based management; and productivity improvement and overhead cost reduction. Finally, Chapter VI provides resource projections that are a reasonable baseline for planning the Laboratory's future.

  13. Florida Growth Fund (Florida)

    Broader source: Energy.gov [DOE]

    The Florida Growth Fund can provide investments in technology and growth-related companies through co-investments with other institutional investors. The Fund awards preference to companies...

  14. Cryogenic support system

    DOE Patents [OSTI]

    Nicol, T.H.; Niemann, R.C.; Gonczy, J.D.

    1988-11-01T23:59:59.000Z

    A support system is disclosed for restraining large masses at very low or cryogenic temperatures. The support system employs a tie bar that is pivotally connected at opposite ends to an anchoring support member and a sliding support member. The tie bar extends substantially parallel to the longitudinal axis of the cold mass assembly, and comprises a rod that lengthens when cooled and a pair of end attachments that contract when cooled. The rod and end attachments are sized so that when the tie bar is cooled to cryogenic temperature, the net change in tie bar length is approximately zero. Longitudinal force directed against the cold mass assembly is distributed by the tie bar between the anchoring support member and the sliding support member. 7 figs.

  15. Cryogenic support system

    DOE Patents [OSTI]

    Nicol, Thomas H. (Aurora, IL); Niemann, Ralph C. (Downers Grove, IL); Gonczy, John D. (Oak Lawn, IL)

    1988-01-01T23:59:59.000Z

    A support system is disclosed for restraining large masses at very low or cryogenic temperatures. The support system employs a tie bar that is pivotally connected at opposite ends to an anchoring support member and a sliding support member. The tie bar extends substantially parallel to the longitudinal axis of the cold mass assembly, and comprises a rod that lengthens when cooled and a pair of end attachments that contract when cooled. The rod and end attachments are sized so that when the tie bar is cooled to cryogenic temperature, the net change in tie bar length is approximately zero. Longitudinal force directed against the cold mass assembly is distributed by the tie bar between the anchoring support member and the sliding support member.

  16. Queens College Student Technology Fee Plan A Summary of the Plans for Student Technology Fee

    E-Print Network [OSTI]

    Johnson Jr.,, Ray

    Plan College: Queens College Recurring Cost: Instructional Resources Capitalization Expected Start Date-10 Recurring Costs 2,694,000$ Capitalization 640,000$ Maintenance 130,000$ Staff 600,000$ Instructional Support access points TBD 8,000$ 7,200$ 9,000$ Software (Provide product name and estimated cost, if known

  17. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2007-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  18. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2005-05-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  19. Hopi Sustainable Energy Plan

    SciTech Connect (OSTI)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01T23:59:59.000Z

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  20. Conduction cooled tube supports

    DOE Patents [OSTI]

    Worley, Arthur C. (Mt. Tabor, NJ); Becht, IV, Charles (Morristown, NJ)

    1984-01-01T23:59:59.000Z

    In boilers, process tubes are suspended by means of support studs that are in thermal contact with and attached to the metal roof casing of the boiler and the upper bend portions of the process tubes. The support studs are sufficiently short that when the boiler is in use, the support studs are cooled by conduction of heat to the process tubes and the roof casing thereby maintaining the temperature of the stud so that it does not exceed 1400.degree. F.

  1. Crystalline titanate catalyst supports

    DOE Patents [OSTI]

    Anthony, R.G.; Dosch, R.G.

    1993-01-05T23:59:59.000Z

    A series of new crystalline titanates (CT) are shown to have considerable potential as catalyst supports. For Pd supported catalyst, the catalytic activity for pyrene hydrogenation was substantially different depending on the type of CT, and one was substantially more active than Pd on hydrous titanium oxide (HTO). For 1-hexene hydrogenation the activities of the new CTs were approximately the same as for the hydrous metal oxide supports.

  2. Certification plan for safety and PRA codes

    SciTech Connect (OSTI)

    Toffer, H.; Crowe, R.D. [Westinghouse Hanford Co., Richland, WA (United States); Ades, M.J. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1990-05-01T23:59:59.000Z

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA&PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan`s objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations.

  3. 100-D Ponds closure plan. Revision 1

    SciTech Connect (OSTI)

    Petersen, S.W.

    1997-09-01T23:59:59.000Z

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.

  4. Vessel structural support system

    DOE Patents [OSTI]

    Jenko, James X. (N. Versailles, PA); Ott, Howard L. (Kiski Twp., Allegheny County, PA); Wilson, Robert M. (Plum Boro, PA); Wepfer, Robert M. (Murrysville, PA)

    1992-01-01T23:59:59.000Z

    Vessel structural support system for laterally and vertically supporting a vessel, such as a nuclear steam generator having an exterior bottom surface and a side surface thereon. The system includes a bracket connected to the bottom surface. A support column is pivotally connected to the bracket for vertically supporting the steam generator. The system also includes a base pad assembly connected pivotally to the support column for supporting the support column and the steam generator. The base pad assembly, which is capable of being brought to a level position by turning leveling nuts, is anchored to a floor. The system further includes a male key member attached to the side surface of the steam generator and a female stop member attached to an adjacent wall. The male key member and the female stop member coact to laterally support the steam generator. Moreover, the system includes a snubber assembly connected to the side surface of the steam generator and also attached to the adjacent wall for dampening lateral movement of the steam generator. In addition, the system includes a restraining member of "flat" attached to the side surface of the steam generator and a bumper attached to the adjacent wall. The flat and the bumper coact to further laterally support the steam generator.

  5. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01T23:59:59.000Z

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  6. Environmental Management System Plan

    E-Print Network [OSTI]

    Fox, Robert

    2009-01-01T23:59:59.000Z

    R-3 • Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

  7. Environmental Protection Implementation Plan

    SciTech Connect (OSTI)

    Brekke, D.D.

    1995-11-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

  8. Individual Development Plan

    Broader source: Energy.gov [DOE]

    To be effective, training decisions made at the organizational and departmental levels must be informed by the needs of the individual. An individual development plan (IDP) is cooperatively...

  9. Microsoft Word - prjct planning

    Broader source: Energy.gov (indexed) [DOE]

    activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies,...

  10. MITG Test Plan

    SciTech Connect (OSTI)

    Eck, Marshall B.

    1981-08-01T23:59:59.000Z

    The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

  11. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public...

  12. Climate Action Plan (Virginia)

    Broader source: Energy.gov [DOE]

    Governor Timothy M. Kaine established the Governor's Commission on Climate Change in December 2007. The commission prepared a plan for Virginia that identified ways to reduce greenhouse gas...

  13. Climate Action Plan (Kentucky)

    Broader source: Energy.gov [DOE]

    The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

  14. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  15. UNIVERSITY OF MISSOURI -COLUMBIA PLANT GROWTH FACILITIES MASTER PLAN

    E-Print Network [OSTI]

    Noble, James S.

    Assessment........................ 2.3a Central Campus Facility Issues...................... 2.3b Ashland.................................... 4.4. Ashland Road Detail Scenario 1..................... 4.5. Phasing

  16. Strengthening Planning Capacity for Low Carbon Growth in Developing...

    Open Energy Info (EERE)

    Bank Partner Japan, United Kingdom Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Greenhouse Gas, Grid...

  17. Vietnam-Strengthening Planning Capacity for Low Carbon Growth...

    Open Energy Info (EERE)

    Bank Partner Japan, United Kingdom Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Greenhouse Gas, Grid...

  18. Philippines-Strengthening Planning Capacity for Low Carbon Growth...

    Open Energy Info (EERE)

    building capacity based on research focusing on economic aspects, and raising public awareness about climate change challenges and opportunities. Objectives The objectives of the...

  19. CDKN-Green Growth: Implications for Development Planning | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWendeGuo FengBoulder, CO)Burundi: Energy

  20. ARM - Lesson Plans: Plant Growth and Carbon Dioxide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related InformationAcid Rain OutreachMoving WaterPast Sea

  1. Cambodia-Green Growth Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreis aCallahan Divide Wind Energy CenterCambodia South-Eastern

  2. Strengthening Planning Capacity for Low Carbon Growth in Developing Asia

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g GrantAtlas (PACAOpen Energy InformationStonyMonitoring |Corp-

  3. Philippines-Strengthening Planning Capacity for Low Carbon Growth in

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrangePeru: Energy Resources

  4. Malaysia-Strengthening Planning Capacity for Low Carbon Growth in

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey,(MonasterLowell Point,ECOInformation Sharing and Car(EC-LEDS)

  5. Peru-Green Growth Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoadingPenobscot County, Maine: Energy Resources JumpPerryman, Maryland: EnergyTaxForestPeru

  6. Jordan-Green Growth Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (botOpen6 Climate ZoneJeromeCounty is a countyJoppatowne,

  7. Thailand-Green Growth Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump Jump to: navigation,Information Global

  8. Ethiopia-Green Growth Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It isInformationexplains a4 Climate ZoneEthicOhm Jump

  9. Indonesia-Strengthening Planning Capacity for Low Carbon Growth in

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: Eden Prairie, MinnesotaIndianapolisDeveloping Asia | Open

  10. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    SciTech Connect (OSTI)

    Chartock, Mike (ed.); Hansen, Todd (ed.)

    1999-08-01T23:59:59.000Z

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  11. Environmental Monitoring Plan, Revision 6

    SciTech Connect (OSTI)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02T23:59:59.000Z

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

  12. Enabling Services Dyslexia Support

    E-Print Network [OSTI]

    Molinari, Marc

    Enabling Services Dyslexia Support Information for Students Website: www.soton.ac.uk/edusupport/dyslexia Contact details Telephone: 023 8059 7726 Email: enable@soton.ac.uk #12;2 About Dyslexia Support · We are a team of specialist dyslexia practitioners within the University of Southampton's Enabling Services

  13. Nanostructured catalyst supports

    DOE Patents [OSTI]

    Zhu, Yimin; Goldman, Jay L.; Qian, Baixin; Stefan, Ionel C.

    2012-10-02T23:59:59.000Z

    The present invention relates to SiC nanostructures, including SiC nanopowder, SiC nanowires, and composites of SiC nanopowder and nanowires, which can be used as catalyst supports in membrane electrode assemblies and in fuel cells. The present invention also relates to composite catalyst supports comprising nanopowder and one or more inorganic nanowires for a membrane electrode assembly.

  14. FM 4-92 (FM 100-10-2) CONTRACTING SUPPORT BRIGADE

    E-Print Network [OSTI]

    US Army Corps of Engineers

    FM 4-92 (FM 100-10-2) CONTRACTING SUPPORT BRIGADE February 2010 DISTRIBUTION RESTRICTION: Approved continues enhancing its capability to plan and provide effective operational contract support for deployed of commercial support to deployed operations, the Army consolidated its expeditionary contracting structure

  15. Advancing Design-for-Assembly: The Next Generation in Assembly Planning

    SciTech Connect (OSTI)

    Calton, T.L.

    1998-12-09T23:59:59.000Z

    At the 1995 IEEE Symposium on Assembly and Task Planning, Sandia National Laboratories introduced the Archimedes 2 Software Tool [2]. The system was described as a second-generation assembly planning system that allowed preliminmy application of awembly planning for industry, while solidly supporting further research in planning techniques. Sandia has worked closely with indust~ and academia over the last four years. The results of these working relationships have bridged a gap for the next generation in assembly planning. Zke goal of this paper is to share Sandia 's technological advancements in assembly planning over the last four years and the impact these advancements have made on the manufacturing communip.

  16. Steam generator support system

    DOE Patents [OSTI]

    Moldenhauer, J.E.

    1987-08-25T23:59:59.000Z

    A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source is disclosed. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances. 4 figs.

  17. Steam generator support system

    DOE Patents [OSTI]

    Moldenhauer, James E. (Simi Valley, CA)

    1987-01-01T23:59:59.000Z

    A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances.

  18. Eastern Band of Cherokee Strategic Energy Plan

    SciTech Connect (OSTI)

    Souther Carolina Institute of energy Studies-Robert Leitner

    2009-01-30T23:59:59.000Z

    The Eastern Band of Cherokee Indians was awarded a grant under the U.S. Department of Energy Tribal Energy Program (TEP) to develop a Tribal Strategic Energy Plan (SEP). The grant, awarded under the “First Steps” phase of the TEP, supported the development of a SEP that integrates with the Tribe’s plans for economic development, preservation of natural resources and the environment, and perpetuation of Tribal heritage and culture. The Tribe formed an Energy Committee consisting of members from various departments within the Tribal government. This committee, together with its consultant, the South Carolina Institute for Energy Studies, performed the following activities: • Develop the Tribe’s energy goals and objectives • Establish the Tribe’s current energy usage • Identify available renewable energy and energy efficiency options • Assess the available options versus the goals and objectives • Create an action plan for the selected options

  19. SNF project engineering process improvement plan

    SciTech Connect (OSTI)

    KELMENSON, R.L.

    1999-05-24T23:59:59.000Z

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999.

  20. Energy and Greenhouse Gas Emissions in China: Growth, Transition, and Institutional Change

    E-Print Network [OSTI]

    Kahrl, Fredrich James

    2011-01-01T23:59:59.000Z

    that support more load following and peaking generation withfor natural gas- fired load following and peaking generationneeded less load- following and peaking generation. Growth

  1. DMP Planning for Big Science Projects

    E-Print Network [OSTI]

    Juan Bicarregui; Norman Gray; Rob Henderson; Roger Jones; Simon Lambert; Brian Matthews

    2012-08-18T23:59:59.000Z

    This report exists to provide high-level guidance for the strategic and engineering development of Data Management and Preservation plans for 'Big Science' data. Although the report's nominal audience is therefore rather narrow, we intend the document to be of use to other planners and data architects who wish to implement good practice in this area. For the purposes of this report, we presume that the reader is broadly persuaded (by external fiat if nothing else) of the need to preserve research data appropriately, and that they have both sophisticated technical support and the budget to support developments. The goal of the document is not to provide mechanically applicable recipes, but to allow the user to develop and lead a high-level plan which is appropriate to their organisation. Throughout, the report is informed where appropriate by the OAIS reference model.

  2. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01T23:59:59.000Z

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  3. Walkability Planning in Jakarta

    E-Print Network [OSTI]

    Lo, Ria S. Hutabarat

    2011-01-01T23:59:59.000Z

    Integrated accessibility strategy and design Legibility Integrated activity Shared spaces Strategy 1: Policy Pedestrian planning as constituency buildingIntegrated activity study Inclusive road designation WikiPlaces pedestrian network mapping Vernacular placemaking and Asian shared street design Pedestrian planning as constituency building

  4. ENERGY EMERGENCY RESPONSE PLAN

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600-2006-014 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION Jackalyne Pfannenstiel Chairman James D Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared

  5. Environmental Protection Implementation Plan

    SciTech Connect (OSTI)

    Brekke, D.D.

    1994-01-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

  6. Hanford facility contingency plan

    SciTech Connect (OSTI)

    Sutton, L.N.

    1996-07-01T23:59:59.000Z

    The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

  7. Marketing Plan for Transmission Planning Services

    E-Print Network [OSTI]

    Tu, Linh

    2006-12-15T23:59:59.000Z

    well because of its people, business market and industry; it is always a good idea to be on the lookout for new markets and clients in other industries and markets. Transmission planning has always been a steady market for the electrical industry...

  8. Growth of yearling fillies fed alfalfa or soybean meal

    E-Print Network [OSTI]

    Wall, Leman H

    1998-01-01T23:59:59.000Z

    Sixteen Quarter Horse yearling fillies were used in a 112-d randomized, block experiment to determine the efficacy of alfalfa hay protein to support growth in young horses. The yearlings were paired according to weight and age then randomly allotted...

  9. Associate at the American Planning Association. Planning for Solar Energy

    E-Print Network [OSTI]

    This Pas; Quicknotes Erin Musiol

    There is a growing desire among communities to become more sustainable. Energy conservation and renewable energy production (including solar energy) play a significant role in community sustainability goals. Public officials and engaged citizens have many opportunities throughout the planning process to help support and advance solar energy initiatives in their communities. LONG-RANGE COMMUNITY VISIONING AND GOAL SETTING Community visioning is often the first step in developing any type of community plan, for establishing new standards, policies, and incentives, for doing development work, and for making public investment decisions. Whether part of a planning process or on its own, visioning is an important first chance to identify new opportunities and priorities—including those related to solar energy. Planners often conduct visioning exercises that produce a community’s long-term goals and objectives. By expressing their views of renewable energy generation during these visioning exercises (including responding to surveys and participating in visioning meetings), citizens enable planners to gauge the level of awareness and importance of solar energy in the community. Planners use this information to develop policies and action items for the community. Once a community agrees upon its long-range goals and objectives, municipal officials should look to them when reviewing development proposals, making budget decisions, and performing other related tasks. Both citizens and public officials should use these visioning meetings to discuss how solar energy is connected to other community goals and values and how solar energy could help achieve other community goals. A PV System installed on a residence. (Photo credit:

  10. Development Plan for the Fuel Cycle Simulator

    SciTech Connect (OSTI)

    Brent Dixon

    2011-09-01T23:59:59.000Z

    The Fuel Cycle Simulator (FCS) project was initiated late in FY-10 as the activity to develop a next generation fuel cycle dynamic analysis tool for achieving the Systems Analysis Campaign 'Grand Challenge.' This challenge, as documented in the Campaign Implementation Plan, is to: 'Develop a fuel cycle simulator as part of a suite of tools to support decision-making, communication, and education, that synthesizes and visually explains the multiple attributes of potential fuel cycles.'

  11. Texas Watershed Planning Short Course Final Report

    E-Print Network [OSTI]

    Wagner, Kevin

    the effectiveness of NPS outreach in Texas to reduce NPS and stormwater pollution, improve water quality on a priority watershed basis, and facilitate greater NPS TMDL and watershed-based plan implementation. #30;e Key EPA Internet Tools for Watershed Management... of protecting and restoring water quality from NPS pollution by providing training to water resource professionals in Texas, which will provide those individuals with knowledge and tools to 1) support the implementation of state, regional, and local programs...

  12. MA - Office of Management - Energy Conservation Plan

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMA Energy Conservation Plan January 2010 1 Office

  13. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01T23:59:59.000Z

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  14. Consortium Support (Fixed Support) | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccessCO2 InjectionDepartmentServicesImporter Q&AsSupport (Fixed

  15. DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan

    E-Print Network [OSTI]

    DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

  16. South Texas Planning Region Public Transportation Coordination Plan

    E-Print Network [OSTI]

    South Texas Development Council Economic Development Program

    2006-12-15T23:59:59.000Z

    KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December.................................................................................................................................1 PLAN PROCESS .............................................................................................................................3 GOALS AND OBJECTIVES...

  17. LAB 3 Cleanroom Fan and Filters Analysis for the Supports

    SciTech Connect (OSTI)

    Cease, H.; /Fermilab

    1998-05-08T23:59:59.000Z

    A 1400 lb blower fan and a 2700 lb filter box are to be supported at Lab 3. The support structure is a framework that suspends from the building wall to the cleanroom and to a washroom. The framework is made of welded 4-inch x 8-inch x 1/4-inch rectangular A36 steel tube. Welds are to be standard prequalified welds as by AISC. The main support frame is approximately 7-feet off the floor and welded onto the top of 10 columns. A deflection and stress study was performed on the planned structure. A scaled plan view is given in drawing 3823.113-MD-358764. The heaviest loaded beams were labeled with a letter designation and were studied for beam deflections and stresses. The 4-inch x 8-inch rectangular tube was also used for the substructure for the fan and filter mounts and to support a temporary floor grating during maintenance.

  18. BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN

    E-Print Network [OSTI]

    Florida, University of

    BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

  19. Environmental Problems Facing Lake Tahoe Algal Growth

    E-Print Network [OSTI]

    Schladow, S. Geoffrey

    fertilizers, which support the growth of free-floating and attached algae. Eutrophication Eutrophication refers to the effects of an overabundance of nutrients. Eutrophication occurs naturally as part. This process normally occurs over millions of years; however, we are seeing the effects of eutrophication

  20. Buried Waste Integrated Demonstration Plan. Revision 1

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01T23:59:59.000Z

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  1. Energy Efficiency Market Sustainable Business Planning | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning, a presentation...

  2. 2012 DOE Strategic Sustainability Performance Plan | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

  3. Support Requirements for Synfuels

    E-Print Network [OSTI]

    Hyland, M. J.

    1981-01-01T23:59:59.000Z

    FORMS OF GOVERNMENT SUPPORT A number of possibilities exist to get the first wave of Synthetic Fuel plants built (Figure 9). GO/CO's (Government Owned/Contractor Operated plants) - We built plants this way during WWII (Synthetic Rubber etc...

  4. Chromatography resin support

    DOE Patents [OSTI]

    Dobos, James G. (North Augusta, SC)

    2002-01-01T23:59:59.000Z

    An apparatus and method of using an improved chromatography resin support is disclosed. The chromatography support platform is provided by a stainless steel hollow cylinder adapted for being inserted into a chromatography column. An exterior wall of the stainless steel cylinder defines a groove for carrying therein an "O"-ring. The upper surface of the stainless steel column is covered by a fine stainless steel mesh welded to the edges of the stainless steel cylinder. When placed upon a receiving ledge defined within a chromatography column, the "O"-ring provides a fluid tight seal with the inner edge wall of the chromatography cylinder. The stainless steel mesh supports the chromatography matrix and provides a back flushable support which is economical and simple to construct.

  5. Program Support Specialist

    Broader source: Energy.gov [DOE]

    The Office of Science is the single largest supporter of basic research in the physical sciences in the United States, providing more than 40 percent of total funding for this vital area of...

  6. Administrative Support Specialist

    Broader source: Energy.gov [DOE]

    The Office of Science is the single largest supporter of basic research in the physical sciences in the United States, providing more than 40 percent of total funding for this vital area of...

  7. Fuel rod support grid

    DOE Patents [OSTI]

    Downs, Robert E. (Monroeville, PA); Schwallie, Ambrose L. (Greensburg, PA)

    1985-01-01T23:59:59.000Z

    A grid for the support of nuclear fuel rods arranged in a triangular array. The grid is formed by concentric rings of strap joined by radially arranged web sections.

  8. Supported inorganic membranes

    DOE Patents [OSTI]

    Sehgal, Rakesh (Albuquerque, NM); Brinker, Charles Jeffrey (Albuquerque, NM)

    1998-01-01T23:59:59.000Z

    Supported inorganic membranes capable of molecular sieving, and methods for their production, are provided. The subject membranes exhibit high flux and high selectivity. The subject membranes are substantially defect free and less than about 100 nm thick. The pores of the subject membranes have an average critical pore radius of less than about 5 .ANG., and have a narrow pore size distribution. The subject membranes are prepared by coating a porous substrate with a polymeric sol, preferably under conditions of low relative pressure of the liquid constituents of the sol. The coated substrate is dried and calcined to produce the subject supported membrane. Also provided are methods of derivatizing the surface of supported inorganic membranes with metal alkoxides. The subject membranes find use in a variety of applications, such as the separation of constituents of gaseous streams, as catalysts and catalyst supports, and the like.

  9. HLW system plan - revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-01-14T23:59:59.000Z

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

  10. Public affairs plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  11. SAE Standards Support

    SciTech Connect (OSTI)

    Gowri, Krishnan

    2012-11-01T23:59:59.000Z

    This report summarizes PNNL activities in FY 2012 in support of the following two vehicle communication standards activities: • Technical support to SAE, ANSI and NIST technical working groups. PNNL actively contributed to the use case development, harmonization, and evaluation of the SAE standards activities for vehicle to grid communication • Tested and validated a set of potential technologies for meeting SAE communication requirements and provided recommendations for technology choices.

  12. Rapid Scan Humidified Growth Cloud Condensation Nuclei Counter

    SciTech Connect (OSTI)

    Gregory L. Kok; Athanasios Nenes

    2013-03-13T23:59:59.000Z

    This research focused on enhancements to the streamwise thermal gradient cloud condensation nuclei counter to support the rapid scan mode and to enhance the capability for aerosol humidified growth measurements. The research identified the needs for flow system modifications and range of capability for operating the conventional instrument in the rapid scan and humidified growth modes.

  13. Certification plan for safety and PRA codes

    SciTech Connect (OSTI)

    Toffer, H.; Crowe, R.D. (Westinghouse Hanford Co., Richland, WA (United States)); Ades, M.J. (Westinghouse Savannah River Co., Aiken, SC (United States))

    1990-05-01T23:59:59.000Z

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations.

  14. FY 1987 current fiscal year work plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01T23:59:59.000Z

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

  15. Environmental monitoring plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1997-02-01T23:59:59.000Z

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  16. Radiation effects on reactor pressure vessel supports

    SciTech Connect (OSTI)

    Johnson, R.E. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Engineering Technology; Lipinski, R.E. [Idaho National Engineering Lab., Rockville, MD (United States)

    1996-05-01T23:59:59.000Z

    The purpose of this report is to present the findings from the work done in accordance with the Task Action Plan developed to resolve the Nuclear Regulatory Commission (NRC) Generic Safety Issue No. 15, (GSI-15). GSI-15 was established to evaluate the potential for low-temperature, low-flux-level neutron irradiation to embrittle reactor pressure vessel (RPV) supports to the point of compromising plant safety. An evaluation of surveillance samples from the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) had suggested that some materials used for RPV supports in pressurized-water reactors could exhibit higher than expected embrittlement rates. However, further tests designed to evaluate the applicability of the HFIR data to reactor RPV supports under operating conditions led to the conclusion that RPV supports could be evaluated using traditional method. It was found that the unique HFIR radiation environment allowed the gamma radiation to contribute significantly to the embrittlement. The shielding provided by the thick steel RPV shell ensures that degradation of RPV supports from gamma irradiation is improbable or minimal. The findings reported herein were used, in part, as the basis for technical resolution of the issue.

  17. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

    1995-02-01T23:59:59.000Z

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  18. Transmission Planning | Department of Energy

    Office of Environmental Management (EM)

    Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

  19. Community Energy Stategic Planning Resources

    Broader source: Energy.gov (indexed) [DOE]

    Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

  20. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

  1. Transition Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

  2. Information resources management long-range plan, FY1994--1998

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  3. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    SciTech Connect (OSTI)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-07-21T23:59:59.000Z

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the Hanford 100 Areas. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at Hanford.

  4. National Center for Combating Terrorism Strategic Plan, September 2003

    SciTech Connect (OSTI)

    Bechtel Nevada

    2003-09-01T23:59:59.000Z

    National Center for Combating Terrorism Strategic Plan is to document the mission, vision, and goals for success; define the build plan; and describe initiatives that support the U.S. Department of Homeland Security, U.S. Department of Defense, U.S. Department of Energy, U.S. Department of Justice, intelligence community, National Governors Association, and other organizations or departments with combating terrorism training, testing, and technology responsibilities.

  5. Alex Linares UPP 502, Planning Skills, Fall 2012

    E-Print Network [OSTI]

    Illinois at Chicago, University of

    and brickyards. In 1852, the opening of the Rock Island railroad also contributed to Blue Island's growth. Blue to block traffic on the Rock Island rail line. On June 30th , 1894, two workers blocked the Rock Island. Source: 2005 Land Use Inventory, Version 1.0, CMAP #12;Alex Linares UPP 502, Planning Skills, Fall 2012

  6. Lessons Learned: Planning and Operating Power Systems with Large

    E-Print Network [OSTI]

    flow) run-of-river hydro plant. While there are plans for large size photovoltaic (PV) installations on both islands, small residential roof-mounted PV systems have already proliferated, and an almost exponential growth of these small systems is forecasted. Figure 1 Small Net Metered PV Systems Installed

  7. Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning

    E-Print Network [OSTI]

    Ferguson, George

    Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning George into a microphone. Over thirteen hours of inter- action have been collected and transcribed (see (Gross, Allen

  8. Developing a Marketing Plan

    E-Print Network [OSTI]

    Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

    2009-03-02T23:59:59.000Z

    Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

  9. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01T23:59:59.000Z

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  10. Walkability Planning in Jakarta

    E-Print Network [OSTI]

    Lo, Ria S. Hutabarat

    2011-01-01T23:59:59.000Z

    Rukmana, Deden. “Street Vendors and Planning in IndonesianYatmo, Yandi Andri. “Street Vendors as 'Out of Place' UrbanYatmo, Yandi Andri. “Street Vendors as 'Out of Place' Urban

  11. CURRICULUM VITAE RESEARCH PLAN

    E-Print Network [OSTI]

    Sørensen, Erik S.

    CURRICULUM VITAE & RESEARCH PLAN Erik Schwartz Sørensen Ph. D. Theoretical Condensed Matter Physics Contents Curriculum vitae 3 Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Recent Invited Talks 21 Referees 22 #12; Erik Sørensen February 19, 2001 3 Curriculum vitae

  12. Constraints and AI Planning 

    E-Print Network [OSTI]

    Nareyek, A; Freuder, E C; Fourer, R; Giunchiglia, R P; Kautz, H; Rintanen, J; Tate, Austin

    2005-01-01T23:59:59.000Z

    Tackling real-world problems often requires to take various types of constraints into account. Such constraint types range from simple numerical comparators to complex resources. This article describes how planning techniques ...

  13. Strategic Plan: Implementation and

    E-Print Network [OSTI]

    Nguyen, Danh

    Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

  14. Business Entity Planning

    E-Print Network [OSTI]

    Thompson, Bill; Hayenga, Wayne

    2008-10-10T23:59:59.000Z

    There are a number of ways farm and ranch businesses can be structured, including partnerships, corporations, limited liability companies, and others. This publication explains how the structure of a business affects estate planning, management...

  15. Planning a Prescribed Burn

    E-Print Network [OSTI]

    Hanselka, C. Wayne

    2009-04-01T23:59:59.000Z

    This leaflet explains how to plan for adequate fuel for a prescribed burn, control the fire, notify the proper authority, manage the burn itself, and conduct follow-up management. A ranch checklist for prescribed burning is included....

  16. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11T23:59:59.000Z

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

  17. Climate Action Plan (Maine)

    Broader source: Energy.gov [DOE]

    In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

  18. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

  19. Haselden/RNL - Research Support Facility Documentary

    ScienceCinema (OSTI)

    None

    2013-05-29T23:59:59.000Z

    The US Department of Energy's (DOE) Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory is positioned to be one of the most energy efficient buildings in the world. It will demonstrate NREL's role in moving advanced technologies and transferring knowledge into commercial applications. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designed and built.

  20. Environmental implementation plan

    SciTech Connect (OSTI)

    Peterson, G.L.

    1994-10-04T23:59:59.000Z

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  1. Metropolitan Transportation Plan 2035

    E-Print Network [OSTI]

    Tyler Area Metropolitan Planning Organization

    2009-12-04T23:59:59.000Z

    Adopted by the Tyler Area MPO Policy Committee December 4, 2009 METROPOLITAN TRANSPORTATION PLAN 2035 Revised April 22, 2010 Adopted by the Tyler Area MPO Policy Committee December 4, 2009 Amended/Revised April 22, 2010 Prepared by: Bucher..., Willis, and Ratliff Corporation 1828 East Southeast Loop 323, Suite 202 Tyler, Texas 75701 903.581.7844 This Document Serves as an Update to the Tyler Area Metropolitan Transportation Plan 2030. Portions of that Document were Unchanged and Appear...

  2. Georgia Institute of Technology chilled water system evaluation and master plan

    SciTech Connect (OSTI)

    NONE

    1996-05-15T23:59:59.000Z

    As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction in the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.

  3. Concentric tube support assembly

    SciTech Connect (OSTI)

    Rubio, Mark F.; Glessner, John C.

    2012-09-04T23:59:59.000Z

    An assembly (45) includes a plurality of separate pie-shaped segments (72) forming a disk (70) around a central region (48) for retaining a plurality of tubes (46) in a concentrically spaced apart configuration. Each segment includes a support member (94) radially extending along an upstream face (96) of the segment and a plurality of annularly curved support arms (98) transversely attached to the support member and radially spaced apart from one another away from the central region for receiving respective upstream end portions of the tubes in arc-shaped spaces (100) between the arms. Each segment also includes a radial passageway (102) formed in the support member for receiving a fluid segment portion (106) and a plurality of annular passageways (104) formed in the support arms for receiving respective arm portions (108) of the fluid segment portion from the radial passageway and for conducting the respective arm portions into corresponding annular spaces (47) formed between the tubes retained by the disk.

  4. New Start for Student Veterans supports current and

    E-Print Network [OSTI]

    for enhanced mobility, academic access and success. Stress management and resilience strategies and resources:1 support of a Student Veteran Coordinator to facilitate: Adjustment to academic/campus culture. Use of critical academic skills such as setting, planning and achieving goals; identification

  5. NSTX Program Governance, Research Support and Facility Operation

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    of DPP, 3 PU faculty) · Graduate students & post-doc (from PU) · Engineering expertise: designNSTX Program Governance, Research Support and Facility Operation Office of Science M.G. Bell, PPPL for the NSTX Research Team NSTX 5 Year Plan Review for 2009-13 Princeton Plasma Physics Laboratory July 28

  6. Public affairs plan

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies.

  7. Environmental Monitoring Plan, Revision 5

    SciTech Connect (OSTI)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27T23:59:59.000Z

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

  8. Hot Springs Metropolitan Planning Organization 2030 Long Range Transportation Plan

    E-Print Network [OSTI]

    Hot Springs Metropolitan Planning Organization

    2005-11-03T23:59:59.000Z

    Hot Springs Area Metropolitan Planning Organization 100 Broadway Terrace Hot Springs, Arkansas 71901 Adopted November 3, 2005 HSA-MPO 2030 LRTPii Participating Agencies Garland County Hot... Federal Highway Administration Federal Transit Administration 2030 Long Range Transportation Plan for the Hot Springs Area Metropolitan Planning Organization This LRTP has been funded with federal Metropolitan Planning (PL) funds through...

  9. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Nickels, J.M.

    1991-06-01T23:59:59.000Z

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  10. OSU Bicycle Plan 2/10 OSU Bicycle Plan

    E-Print Network [OSTI]

    Escher, Christine

    OSU Bicycle Plan 2/10 DRAFT OSU Bicycle Plan Introduction Goals and Performance Measures (statistics and data points) Bicycle Network (circulation and parking) Bicycle Programs (incentives, outreach, education and enforcement) Improvement Plan #12;OSU Bicycle Plan 2/10 Introduction The 2010 Oregon State

  11. Growth and poverty in the urban fringe : decentralization, dispersion, and inequality in greater Buenos Aires

    E-Print Network [OSTI]

    Libertun de Duren, Nora R

    2007-01-01T23:59:59.000Z

    This research presents the case of growth in Buenos Aires since the late 1970s, when the decentralization of urban planning powers in the Province of Buenos Aires began, until 2001, when an economic crisis submerged -even ...

  12. The quality of change : growth of a whitewater resort in North Carolina

    E-Print Network [OSTI]

    Larson, Christopher Cole

    1983-01-01T23:59:59.000Z

    This thesis is a study of change and constancy -- planning for incremental growth in a manner that will give emphasis to the whole and not the increments. The Nantahala Outdoor Center is a center for white water activities ...

  13. Sampling and Analysis Plan - Waste Treatment Plant Seismic Boreholes Project

    SciTech Connect (OSTI)

    Reidel, Steve P.

    2006-05-26T23:59:59.000Z

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the basalt, up to three new deep rotary boreholes through the basalt and sedimentary interbeds, and one corehole through the basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities.

  14. Crank shaft support assembly

    DOE Patents [OSTI]

    Natkin, Robert J. (Canton, MI); Oltmans, Bret (Stacy, MN); Allison, John E. (Ann Arbor, MI); Heater, Thomas J. (Milford, MI); Hines, Joy Adair (Plymouth, MI); Tappen, Grant K. (Washington, MI); Peiskammer, Dietmar (Rochester, MI)

    2007-10-23T23:59:59.000Z

    A crank shaft support assembly for increasing stiffness and reducing thermal mismatch distortion in a crank shaft bore of an engine comprising different materials. A cylinder block comprises a first material and at least two crank journal inserts are insert-molded into respective crank journal regions of the cylinder block and comprise a second material having greater stiffness and a lower thermal coefficient of expansion that the first material. At least two bearing caps are bolted to the respective crank journal inserts and define, along with the crank journal inserts, at least two crank shaft support rings defining a crank shaft bore coaxially aligned with a crank shaft axis. The bearing caps comprise a material having higher stiffness and a lower thermal coefficient of expansion than the first material and are supported on the respective crank journal inserts independently of any direct connection to the cylinder block.

  15. Plan generation strategies for a knowledge based process planning system

    E-Print Network [OSTI]

    Hari, Umesh

    1993-01-01T23:59:59.000Z

    -12. Checking Manufacturability at Site 3-13. Plan Alternate Process 3-14. Review Plans Critically 3-15. Plan Refinement 3-16. Evaluation of Plans 45 47 48 49 50 52 3-17. Detail Plan 53 3-18. Understanding Part Features 55 3-19. Evolving... manufacturing system where quick decisions have to be made on the shop when production is interrupted for contingencies. 15 2. 3. 2 The Generative Approach A generative process planning system synthesizes new process plans automatically. It enables...

  16. See also the BFA Budget and Planning Committee's reports: Part 1: How The Tuition Increase was Spent, and

    E-Print Network [OSTI]

    Vasilyev, Oleg V.

    See also the BFA Budget and Planning Committee's reports: Part 1: How The Tuition.5 Whereas the BFA Budget and Planning Committee has authored a report of how this year's tuition increases were used; and Whereas the Budget and Planning Committee would like to support Administration

  17. Aerogel-supported filament

    DOE Patents [OSTI]

    Wuest, Craig R. (Danville, CA); Tillotson, Thomas M. (Tracy, CA); Johnson, III, Coleman V. (Dallas, TX)

    1995-01-01T23:59:59.000Z

    The present invention is a thin filament embedded in a low density aerogel for use in radiation detection instruments and incandescent lamps. The aerogel provides a supportive matrix that is thermally and electrically nonconductive, mechanically strong, highly porous, gas-permeable, and transparent to ionizing radiation over short distances. A low density, open-cell aerogel is cast around a fine filament or wire, which allows the wire to be positioned with little or no tension and keeps the wire in place in the event of breakage. The aerogel support reduces the stresses on the wire caused by vibrational, gravitational, electrical, and mechanical forces.

  18. Aerogel-supported filament

    DOE Patents [OSTI]

    Wuest, C.R.; Tillotson, T.M.; Johnson, C.V. III

    1995-05-16T23:59:59.000Z

    The present invention is a thin filament embedded in a low density aerogel for use in radiation detection instruments and incandescent lamps. The aerogel provides a supportive matrix that is thermally and electrically nonconductive, mechanically strong, highly porous, gas-permeable, and transparent to ionizing radiation over short distances. A low density, open-cell aerogel is cast around a fine filament or wire, which allows the wire to be positioned with little or no tension and keeps the wire in place in the event of breakage. The aerogel support reduces the stresses on the wire caused by vibrational, gravitational, electrical, and mechanical forces. 6 Figs.

  19. Lecture outline Support vector machines

    E-Print Network [OSTI]

    Terzi, Evimaria

    Lecture outline · Support vector machines #12;Support Vector Machines · Find a linear hyperplane (decision boundary) that will separate the data #12;Support Vector Machines · One Possible Solution #12;Support Vector Machines · Another possible solution #12;Support Vector Machines · Other possible solutions

  20. Lecture outline Support vector machines

    E-Print Network [OSTI]

    Terzi, Evimaria

    Lecture outline · Support vector machines #12;Support Vector Machines · Find a linear hyperplane (decision boundary) that will separate the data #12;Support Vector Machines · One Possible Solution B1 #12;Support Vector Machines · Another possible solution B2 #12;Support Vector Machines · Other possible

  1. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    None

    2010-07-01T23:59:59.000Z

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

  2. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.

  3. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.

  4. FORMALDEHYDE Formaldehyde Management Plan i

    E-Print Network [OSTI]

    Rubloff, Gary W.

    and Evaluation) Facilities Management Work Control Center (40)5-2222 (Repair of Facility Equipment DeficienciesFORMALDEHYDE MANAGEMENT PLAN #12;Formaldehyde Management Plan i Review and Approval Authority Formaldehyde Management Plan this page intentionally blank #12;Formaldehyde Management Plan iii Table

  5. Forestry Commission England Corporate Plan

    E-Print Network [OSTI]

    Forestry Commission England Corporate Plan 2011-15 This is the Corporate Plan for the Forestry Commission in England. It is one of a suite of plans including those for Forestry Commission (GB) and Forest Research. Page 1Forestry Commission England Corporate Plan 2011-15 #12;Page 2Forestry Commission England

  6. Windward Community College Strategic Plan

    E-Print Network [OSTI]

    .......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

  7. Typical support and Sanov large deviations of correlated states

    E-Print Network [OSTI]

    I. Bjelakovic; J. -D. Deuschel; T. Krueger; R. Seiler; Ra. Siegmund-Schultze; A. Szkola

    2007-03-28T23:59:59.000Z

    Discrete stationary classical processes as well as quantum lattice states are asymptotically confined to their respective typical support, the exponential growth rate of which is given by the (maximal ergodic) entropy. In the iid case the distinguishability of typical supports can be asymptotically specified by means of the relative entropy, according to Sanov's theorem. We give an extension to the correlated case, referring to the newly introduced class of HP-states.

  8. Optimal Interdiction of Attack Plans Joshua Letchford

    E-Print Network [OSTI]

    Vorobeychik, Eugene

    Economics, Security, Algorithms Keywords Game theory, security, planning, plan interdiction 1. INTRODUCTION

  9. Simulation Supported Decision Making

    E-Print Network [OSTI]

    .S. Navy Nuclear Program · Decades of dynamic operations of hundreds of nuclear power plants withoutSimulation Supported Decision Making Gene Allen Naval Surface Warfare Center Carderock Division SI: TO PASS ON WHAT I KNOW on SIMULATION · CAREER FOCUS: HOW TO USE COMPUTERS TO DO HELP MAKE BETTER DECISIONS

  10. Respiratory Mechanisms of Support

    E-Print Network [OSTI]

    Kay, Mark A.

    Respiratory Mechanisms of Support Nasal Cannula Hi Flow Nasal Cannula CPAP Continuous positive the respiratory system is working to compensate for a metabolic issue so as to normalize the blood pH. HCO3 - 22 uses PIP Mechanical Ventilation: Volume vs. Pressure: Volume Control Pressure Control Cycle Volume Time

  11. International Nuclear Safeguards Inspection Support Tool

    SciTech Connect (OSTI)

    Steinmaus, K.L.; Wukelic, G.E.; Beal, O.M.

    1994-03-01T23:59:59.000Z

    The US Department of Energy (DOE) is committed to developing technologies to meet escalating requirements for the International Atomic Energy Agency (IAEA) Non-Proliferation Treaty (NPT) monitoring and associated inspections. This commitment involves the customization and transfer of existing remote monitoring/information management technologies for use by the IAEA. This paper describes an information management system called INSIST International Nuclear Safeguards Inspection Support Tool, which was developed by the Pacific Northwest Laboratory (PNL) to support the IAEA Action Team in its role of monitoring and verifying compliance under United Nations Special Commission (UNSC) Resolutions 687, 707, and 715. Initial emphasis was placed on developing and deploying functionality and databases customized to support the Action Team. Throughout the design and customization of INSIST, emphasis was placed on information storage and retrieval capabilities for data gathered by the Action Team. In addition, PNL provided the Action Team with maps and satellite images and other relevant Iraqi databases to further facilitate the following activities: monitoring nuclear activities, facility operations, and nuclear material inventories assisting in inspection planning and training providing post inspection analysis providing onsite inspection support reporting on inspection findings.

  12. Optimal Model-Based Production Planning

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    1 Optimal Model-Based Production Planning for Refinery Operation Abdulrahman Alattas Advisor;2 Outline Introduction Problem Statement Refinery Planning Model Development LP Planning Models NLP Planning Models Conclusion #12;3 Introduction Refinery production planning models Optimizing refinery

  13. Agent Program Planning Information Money Smart

    E-Print Network [OSTI]

    Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

  14. DAF Glovebox Project Plan

    SciTech Connect (OSTI)

    Martinez, M.W.; Higgs, R.L.

    2000-11-14T23:59:59.000Z

    This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

  15. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17T23:59:59.000Z

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  16. Environmental Restoration Program Document Control Plan

    SciTech Connect (OSTI)

    Montgomery, L.M.

    1993-09-01T23:59:59.000Z

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  17. National Ignition Facility project acquisition plan

    SciTech Connect (OSTI)

    Callaghan, R.W.

    1996-04-01T23:59:59.000Z

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  18. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01T23:59:59.000Z

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  19. Strategic Planning for Landowners

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-09-16T23:59:59.000Z

    Strategic Planning for Landowners Risk Management E-146 RM3-12.0 09-08 *Assistant Professor and Extension Economist?Management, and Extension Specialist?Risk Management, The Texas A&M System Strategic planning is a process that provides direction... the bottom up. Managers are also responsible for Jason L. Johnson and Wade Polk* 2 carrying out those required daily tasks. Land- owners are often both manager and employee, which demands a combination of vision and technical aptitude. Steps for Setting...

  20. Performance Management Plan

    SciTech Connect (OSTI)

    IT Corporation, Las Vegas, NV

    2002-08-21T23:59:59.000Z

    This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

  1. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01T23:59:59.000Z

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  2. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  3. Career Planning - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearchCASL Symposium: CelebratingMissionat|planning Career Planning

  4. Joint ECE/PLI Seminar Title: Innovation Growth and Renewal

    E-Print Network [OSTI]

    Joint ECE/PLI Seminar Title: Innovation ­ Growth and Renewal Speaker: Chris Christopher, ECE, business plan development, operations, and executive coaching. He is currently engaged in a management, desktop computer software, operating systems, languages and graphics. He was born in Greece, where he

  5. Sorghum Growth and Development

    E-Print Network [OSTI]

    Gerik, Tom; Bean, Brent W.; Vanderlip, Richard

    2003-08-07T23:59:59.000Z

    Sorghum is well adapted to Texas, and its ability to yield consistently makes it popular with growers. This publication discusses sorghum plant biology and growth....

  6. Strategic Growth Initiative (Michigan)

    Broader source: Energy.gov [DOE]

    A joint venture between Michigan Department of Agriculture and Rural Development (MDARD) and the Michigan Economic Development Corporation (MEDC), the Strategic Growth Initiative Grant Program was...

  7. Impacted material placement plans

    SciTech Connect (OSTI)

    Hickey, M.J.

    1997-01-29T23:59:59.000Z

    Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility.

  8. Introduction to Transportation Planning

    E-Print Network [OSTI]

    Tipple, Brett

    Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 on a Saturday night, transportation is not an objective in and of itself, but a means to carry out the functions of daily living (i.e., it's a "derived good"). As a consequence, the transportation systems we build

  9. PENSION PLAN INFORMATION SESSION

    E-Print Network [OSTI]

    Kambhampati, Patanjali

    %)* QPP (20%) Personal Savings RRSP, TFSA Company Pension Plan (49%)** Government Benefits Personal.lastname@mcgill.ca). If you forget your McGill Username or McGill Password, try logging into Minerva with your 9-digit McGill ID number and PIN. Once you have logged in successfully, go to the Personal Menu > Password for Mc

  10. Climate Change Scoping Plan

    E-Print Network [OSTI]

    Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

  11. Climate Change Scoping Plan

    E-Print Network [OSTI]

    Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

  12. Multispecies Conservation Planning

    E-Print Network [OSTI]

    CHAPTER 3 Multispecies Conservation Planning on U.S. Federal Lands Barry R. Noon, Kevin S. McKelvey, and Brett G. Dickson Numerous laws directly, or indirectly, mandate the conservation of all species that govern the use of these same lands that are in conflict with a goal of maximizing the conservation

  13. Conservation Plan Issues

    E-Print Network [OSTI]

    1 Northwest Power and Conservation Council Plan Issues: Regional Surplus Northwest Power and Conservation Council What is the Issue? · Some have expressed concern about the surplus that is included lean on the market and be fine ­ Calls into question the aggressive pursuit of conservation

  14. Gonzales Comprehensive Plan

    E-Print Network [OSTI]

    Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

    2013-01-01T23:59:59.000Z

    Program’s (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails...…………………..………………………………………………...…………………...….242 Environment…………………….……………………………………………………………………….……..….245 Future Environment………………...……………………………………………..…………...…..283 Policy Table……………………..……………………………………………………...…...………….288 Appendix………………….…………………………………………………………...…………………292 Urban Design...

  15. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    NONE

    1995-09-12T23:59:59.000Z

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  16. Student Health Benefit Plan

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    and programs tailored to the needs of students. The SHBP coordinates care with University Health Services (UHS), UMass Amherst's fully accredited health center. UHS provides comprehensive primary care, walk-in care2 2013-2014 Student Health Benefit Plan (SHBP) Designed for the Students of Policy Period: August 1

  17. Search Criteria Health Plan

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    Search Criteria Location: Distance: Health Plan: Provider Type: San Diego, CA 92103 Within 10 miles another provider, you are seeking care from that provider, not from Anthem Blue Cross. The provider benefit decisions only and are not the provision of medical care. Anthem Blue Cross is not responsible for

  18. COMMUNITY WILDFIRE PROTECTION PLANS

    E-Print Network [OSTI]

    natural resource knowledge and technical expertise to the planning process, particularly in the areas of GIS and mapping, vegetation management, assessment of values and risks and funding strategies. WHAT of the community, priorities for fuel treatment may include critical watersheds, public water and power facilities

  19. Environmental Education Strategic Plan

    SciTech Connect (OSTI)

    none,

    1991-12-01T23:59:59.000Z

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  20. Action Plan Materials Science

    E-Print Network [OSTI]

    Fitze, Patrick

    sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

  1. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect (OSTI)

    NONE

    1994-08-31T23:59:59.000Z

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  2. Oak Ridge National Laboratory Institutional Plan, FY 1997--FY 2002

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    Three major initiatives are described, which are proposed to strengthen ORNL`s ability to support the missions of the Department: neutron science, functional genomics, and distributed computing at teraflop speeds. The laboratory missions, strategic plan, scientific and technical programs, enterprise activities, laboratory operations, and resource projections are also described.

  3. EMSL Strategic Plan to Maximize Scientific Impact of

    E-Print Network [OSTI]

    ) is a new facility built to support scientific research that will enable cost-effective solutions to the U, and maximize the scientific benefit of that investment, the Performance Evaluation Management Plan (PEMP to maximize the benefit of the investment, and Target Outreach to cultivate new users and ultimately

  4. www.facilities.ufl.edu BUSINESS AFFAIRS PLANNING DESIGN & CONSTRUCTION

    E-Print Network [OSTI]

    Slatton, Clint

    www.facilities.ufl.edu BUSINESS AFFAIRS PLANNING DESIGN & CONSTRUCTION PDC PROJECT MANAGEMENT GUIDE are available on the PDC website. The PM and CA shall use the PDC pay application checklist as a means to support the Cost of Work. PDC REVISED JANUARY 2014 PAGE 1 OF 3 #12;a)All trade contractors' pay

  5. US ARMY CORPS OF ENGINEERS PLANNING AND RESPONSE TEAM

    E-Print Network [OSTI]

    US Army Corps of Engineers

    US ARMY CORPS OF ENGINEERS PLANNING AND RESPONSE TEAM INFRASTRUCTURE ASSESSMENT MISSION GUIDE March, hazardous materials, water and wastewater infrastructure (e.g. treatment facilities, lift stations, other Federal agencies (e.g. Bureau of Reclamation). The IA PRT program also supports water/wastewater

  6. A Program Plan for Photovoltaic Buildings in Florida

    Broader source: Energy.gov [DOE]

    This document outlines plans developed by the Florida Solar Energy Center (FSEC) to support photovoltaic buildings application in the state through the first decade of the 21st century. The emphasis of this program is on identifying and increasing the value of rooftop systems to targeted end users through the use of application experiments.

  7. Best Practices in Developing a Tribal Strategic Energy Plan

    Broader source: Energy.gov [DOE]

    This webinar on Jan. 28, 2015 from 11 a.m. to 12:30 p.m. will cover strategic energy plans. Attendees will learn from experts who have overcome typical barriers and used community participation to gain support and ownership.

  8. Sampling and Analysis Plan for PUREX canyon vessel flushing

    SciTech Connect (OSTI)

    Villalobos, C.N.

    1995-03-01T23:59:59.000Z

    A sampling and analysis plan is necessary to provide direction for the sampling and analytical activities determined by the data quality objectives. This document defines the sampling and analysis necessary to support the deactivation of the Plutonium-Uranium Extraction (PUREX) facility vessels that are regulated pursuant to Washington Administrative Code 173-303.

  9. Chemical Hygiene Plan i January 2013 Chemical Hygiene Plan

    E-Print Network [OSTI]

    Nizkorodov, Sergey

    Chemical Hygiene Plan i January 2013 Chemical Hygiene Plan (CHP) (Appendix C in Lab Safety Manual........................................................................................................................1-1 Chapter 2: Chemical Hazard Communication....................................................................................2-1 Chapter 3: Classes of Hazardous Chemicals

  10. Architecture & Urban Planning College of Architecture & Urban Planning

    E-Print Network [OSTI]

    Shyy, Wei

    Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 300 projects for the remainder of the term. 560 Macroecon Envir Bus 3.00 ADVISORY, ENFORCED 74595 P RW REC 451

  11. Architecture & Urban Planning College of Architecture & Urban Planning

    E-Print Network [OSTI]

    Shyy, Wei

    Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 690 Arc is reserved for Executive MBA students only, and meets from 7/19- 9/6. 637 Macroecon Envir Bus 1.50 ADVISORY

  12. Idaho National Laboratory Site Pollution Prevention Plan

    SciTech Connect (OSTI)

    E. D. Sellers

    2007-03-01T23:59:59.000Z

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.

  13. Mobile Journey Planning for Bus Passengers Desmond Rainsford and William A Mackaness

    E-Print Network [OSTI]

    1 Mobile Journey Planning for Bus Passengers Desmond Rainsford and William A Mackaness Geography. Developments in mobile technology offer new ways of supporting mobile decision making. One application domain in the area of Location Based Services (LBS) is the delivery of journey plans to a mobile device. Few journey

  14. EU in push for support on nuclear fusion reactor September 26, 2004

    E-Print Network [OSTI]

    EU in push for support on nuclear fusion reactor September 26, 2004 Page Tool EU ministers have agreed to try to win broad international support for a plan to build a futuristic nuclear reactor to obtain power through nuclear fusion, a clean energy source. But views are split on where the ITER reactor

  15. Scanning Tunneling Microscopy Studies of Metal Clusters Supported on Graphene and Silica Thin Film

    E-Print Network [OSTI]

    Zhou, Zihao

    2012-10-19T23:59:59.000Z

    The understanding of nucleation and growth of metals on a planar support at the atomic level is critical for both surface science research and heterogeneous catalysis studies. In this dissertation, two planar substrates, including graphene and ultra...

  16. Supporting Solar Power in Renewables Portfolio Standards: Experience from the United States

    E-Print Network [OSTI]

    Wiser, Ryan

    2010-01-01T23:59:59.000Z

    little to support growth in renewable energy supplies, andgrowth between 2000 and 2025. If these states increase their renewable energygrowth has been driven by a number of factors, including (though not limited to) Federal tax incentives, state renewable energy

  17. The Emergence of Nonbulk Properties in Supported Metal Clusters: Negative Thermal Expansion and Atomic Disorder in

    E-Print Network [OSTI]

    Frenkel, Anatoly

    that are critical to the growth of the American economy.1-3 Prominent examples of processes in which supported metal catalysts play an indispensable role include petroleum refining,2,3 environmental remediation (e

  18. Planning for a regional rail system : analysis of high speed and high quality rail in the Basque region

    E-Print Network [OSTI]

    Lewis, Paul R. S. (Paul Robinson S.)

    2011-01-01T23:59:59.000Z

    The goal of this thesis is to provide guidance for regional rail network planning to achieve the maximum benefits in terms of economic growth, passenger satisfaction, and environmental sustainability. The hypothesis is ...

  19. Cryogenic support member

    DOE Patents [OSTI]

    Niemann, Ralph C. (Downers Grove, IL); Gonczy, John D. (Oak Lawn, IL); Nicol, Thomas H. (Aurora, IL)

    1987-01-01T23:59:59.000Z

    A cryogenic support member is comprised of a non-metallic rod having a depression in at least one end and a metallic end connection assembled to the rod. The metallic end connection comprises a metallic plug which conforms to the shape and is disposed in the depression and a metallic sleeve is disposed over the rod and plug. The plug and the sleeve are shrink-fitted to the depression in the rod to form a connection good in compression, tension and bending.

  20. Appendix G Supporting Documentation

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawanda North Site ThisSupporting

  1. Marketing Plan for Demonstration and Validation Assets

    SciTech Connect (OSTI)

    None

    2008-05-30T23:59:59.000Z

    The National Security Preparedness Project (NSPP), is to be sustained by various programs, including technology demonstration and evaluation (DEMVAL). This project assists companies in developing technologies under the National Security Technology Incubator program (NSTI) through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. This report documents the DEMVAL marketing and visibility plan, which will focus on collecting information about, and expanding the visibility of, DEMVAL assets serving businesses with national security technology applications in southern New Mexico.

  2. CRAD, Maintenance Assessment Plan

    Broader source: Energy.gov [DOE]

    An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

  3. Massachusetts Ocean Management Plan (Massachusetts)

    Broader source: Energy.gov [DOE]

    The Massachusetts Ocean Act of 2008 required the state’s Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

  4. Climate Action Plan (Ontario, Canada)

    Broader source: Energy.gov [DOE]

    Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate change and the problems it poses. The Plan...

  5. Accessibility-based transit planning

    E-Print Network [OSTI]

    Busby, Jeffrey R

    2004-01-01T23:59:59.000Z

    A method for evaluating transit planning proposals using accessibility metrics is advanced in this research. A transit-accessibility model is developed intended for use by in-house transit agency planning staff as a ...

  6. Agricultural Sciences Strategic Plan 20082013

    E-Print Network [OSTI]

    Kaye, Jason P.

    Actions 15 Facilities and Land--Progress and Further Planning 24 FiveYear Recycling Plan and Program.This daring concept has led to a nationwide system of colleges and universities that create new knowledge

  7. PLANNING UNIT October 26, 2009

    E-Print Network [OSTI]

    Prasad, Sanjiva

    PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

  8. Pressurizer tank upper support

    DOE Patents [OSTI]

    Baker, Tod H. (O'Hara Township, Allegheny County, PA); Ott, Howard L. (Kiski Township, Armstrong County, PA)

    1994-01-01T23:59:59.000Z

    A pressurizer tank in a pressurized water nuclear reactor is mounted between structural walls of the reactor on a substructure of the reactor, the tank extending upwardly from the substructure. For bearing lateral loads such as seismic shocks, a girder substantially encircles the pressurizer tank at a space above the substructure and is coupled to the structural walls via opposed sway struts. Each sway strut is attached at one end to the girder and at an opposite end to one of the structural walls, and the sway struts are oriented substantially horizontally in pairs aligned substantially along tangents to the wall of the circular tank. Preferably, eight sway struts attach to the girder at 90.degree. intervals. A compartment encloses the pressurizer tank and forms the structural wall. The sway struts attach to corners of the compartment for maximum stiffness and load bearing capacity. A valve support frame carrying the relief/discharge piping and valves of an automatic depressurization arrangement is fixed to the girder, whereby lateral loads on the relief/discharge piping are coupled directly to the compartment rather than through any portion of the pressurizer tank. Thermal insulation for the valve support frame prevents thermal loading of the piping and valves. The girder is shimmed to define a gap for reducing thermal transfer, and the girder is free to move vertically relative to the compartment walls, for accommodating dimensional variation of the pressurizer tank with changes in temperature and pressure.

  9. Pressurizer tank upper support

    DOE Patents [OSTI]

    Baker, T.H.; Ott, H.L.

    1994-01-11T23:59:59.000Z

    A pressurizer tank in a pressurized water nuclear reactor is mounted between structural walls of the reactor on a substructure of the reactor, the tank extending upwardly from the substructure. For bearing lateral loads such as seismic shocks, a girder substantially encircles the pressurizer tank at a space above the substructure and is coupled to the structural walls via opposed sway struts. Each sway strut is attached at one end to the girder and at an opposite end to one of the structural walls, and the sway struts are oriented substantially horizontally in pairs aligned substantially along tangents to the wall of the circular tank. Preferably, eight sway struts attach to the girder at 90[degree] intervals. A compartment encloses the pressurizer tank and forms the structural wall. The sway struts attach to corners of the compartment for maximum stiffness and load bearing capacity. A valve support frame carrying the relief/discharge piping and valves of an automatic depressurization arrangement is fixed to the girder, whereby lateral loads on the relief/discharge piping are coupled directly to the compartment rather than through any portion of the pressurizer tank. Thermal insulation for the valve support frame prevents thermal loading of the piping and valves. The girder is shimmed to define a gap for reducing thermal transfer, and the girder is free to move vertically relative to the compartment walls, for accommodating dimensional variation of the pressurizer tank with changes in temperature and pressure. 10 figures.

  10. Licensing plan for UMTRA project disposal sites. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC`s acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information.

  11. Longevity of Emplacement Drift Ground Support Materials

    SciTech Connect (OSTI)

    D. Tang

    2000-01-07T23:59:59.000Z

    The purpose of this analysis is to evaluate the factors affecting the longevity of emplacement drift ground support materials and to develop a basis for selection of materials for ground support that will function throughout the preclosure period. The Development Plan (DP) for this analysis is given in CRWMS M&O (Civilian Radioactive Waste Management System Management and Operating Contractor) (1999a). The candidate materials for ground support are steel (carbon steel, ductile cast iron, galvanized steel, and stainless steel, etc.) and cement. Steel will mainly be used for steel sets, lagging, channels, rock bolts, and wire mesh. Cement usage is only considered in the case of grouted rock bolts. The candidate materials for the invert structure are steel and crushed rock ballast. The materials shall be evaluated for the repository emplacement drift environment under a specific thermal loading condition based on the proposed License Application Design Selection (LADS) design. The analysis consists of the following tasks: (1) Identify factors affecting the longevity of ground control materials for use in emplacement drifts. (2) Review existing documents concerning behavior of candidate ground control materials during the preclosure period. The major criteria to be considered for steel are mechanical and thermal properties, and durability, of which corrosion is the most important concern. (3) Evaluate the available results and develop recommendations for material(s) to be used.

  12. Best Management Practice #1: Water Management Planning

    Broader source: Energy.gov [DOE]

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  13. Space Conditioning Standing Technical Committee Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

  14. Project Management Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

  15. NERSC Strategic Plan Is Now Online

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. More NERSC...

  16. NATIONAL PLAN TO ACHIEVE MARITIME DOMAIN AWARENESS

    E-Print Network [OSTI]

    Acton, Scott

    infrastructure following attack or similar disruption. · Maritime Transportation System Security Plan responds regarding the maritime domain. · Maritime Commerce Security Plan establishes a comprehensive plan to secure

  17. Strategic Energy Planning | Department of Energy

    Office of Environmental Management (EM)

    Resources Energy Resource Library Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy...

  18. 2030 Transportation and Mobility Plan

    E-Print Network [OSTI]

    Bi-State Metropolitan Planning Organization

    2006-08-11T23:59:59.000Z

    sections are as follows: 1. Introduction 2. Bi-State MPO Area Description 3. Planning Horizon Description and Data Projections 4. Long Range Plan Presentation 5. Plan Implementation and Monitoring Procedures 6. Bi-State MPO 2030 Transportation..., improved access at the Leigh Avenue/I-540 interchange, and the deployment of appropriate Intelligent Transportation Systems (ITS) projects. The Airport Master Plan Update has estimated a total airport improvement cost of $ 74,170,000 over a Three (3...

  19. Climate Action Plan (Manitoba, Canada)

    Broader source: Energy.gov [DOE]

    Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

  20. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect (OSTI)

    Walsh, J.L.

    1993-12-01T23:59:59.000Z

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.