National Library of Energy BETA

Sample records for group work plan

  1. Transportation Plan Ad Hoc Working Group | Department of Energy

    Office of Environmental Management (EM)

    Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group PDF icon Transportation Plan Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and...

  2. TEC Working Group Topic Groups Rail Key Documents Planning Subgroup |

    Office of Environmental Management (EM)

    Department of Energy Planning Subgroup TEC Working Group Topic Groups Rail Key Documents Planning Subgroup Planning Subgroup Rail Planning Timeline (135.57 KB) Benchmarking Project: AREVA Trip Report (651.92 KB) More Documents & Publications TEC Meeting Summaries - July 2007 Evaluation of Shortline Railroads & SNF/HLW Rail Shipment Inspections Tasked for the Transportation of Spent Nuclear Fuel Federal Railroad Administration

  3. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Work Plan - U.S.-India Coal Working Group (700.48 KB) More Documents & Publications Work Group Telecom (Draft Charters) U.S.-India Coal Working Group Terms of Reference Work Group ...

  4. Habitat planning, maintenance and management working group

    SciTech Connect (OSTI)

    1997-03-01

    The Gulf of Mexico (GOM), called {open_quotes}America`s Sea,{close_quotes} is actually a small ocean basin covering over 1.5 million square kilometers. Because of the multiple uses, diversity, and size of the Gulf`s resources, management is shared by a number of governmental agencies including the Minerals Management Service, the Gulf of Mexico Fishery Management Council, the Gulf States Marine Fisheries Commission, National Marine Fisheries Service, the US Coast Guard, the US Army Corps of Engineers, and the five Gulf states fisheries agencies. All of these entities share a common goal of achieving optimum sustainable yield to maximize geological, biological, social, and economic benefits from these resources. These entities also share a common theme that the successful management of the northern GOM requires maintenance and enhancement of both the quantity and quality of habitats. A closer look at the GOM shows the sediment to be clearly dominated by vast sand and mud plains. These soft bottom habitats are preferred by many groundfish and shrimp species and, thus, have given rise to large commercial fisheries on these stocks. Hard bottom and reef habitats, on the other hand, are limited to approximately 1.6% of the total area of the Gulf, so that, while there are high demands by commercial and recreational fishermen for reef associated species, the availability of habitat for these stocks is limited. The thousands of oil and gas structures placed in the Gulf have added significant amounts of new hard substrate. The rigs-to-reefs concept was a common sense idea with support from environmental user groups and the petroleum industry for preserving a limited but valuable habitat type. As long as maximizing long-term benefits from the Gulf s resources for the greatest number of users remains the goal, then programs such as Rigs-to-Reefs will remain an important tool for fisheries and habitat managers in the Gulf.

  5. US - Brazil Binational Energy Working Group Joint Action Plan...

    Broader source: Energy.gov (indexed) [DOE]

    brazilactionplan7202010.pdf More Documents & Publications U.S.-Brazil Binational Joint Action Plan Webtrends Archives by Fiscal Year - International Activities EIS-0309: Record...

  6. R&D Plan for the High Temperature Membrane Working Group | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy R&D Plan for the High Temperature Membrane Working Group R&D Plan for the High Temperature Membrane Working Group Summary of challenges, approaches and technical targets for HFCIT's High Temperature Membrane Working Group. htwg_rd_plan.pdf (459.89 KB) More Documents & Publications Table I: Technical Targets for Catalyst Coated Membranes (CCMs): Automotive Table III: Technical Targets for Catalyst Coated Membranes (CCMs): Stationary Table IV: Technical Targets for

  7. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  8. 2007 Long Range Plan Working Group Members | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) 7 Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings NSAC Members Charges/Reports Charter .pdf file (78KB) NP Committees of Visitors Federal Advisory Committees NP Home NSAC Members 2007 Long Range Plan Working Group Members Print Text Size: A A A FeedbackShare Page Beise, Elizabeth University of Maryland Merninga, Lia TJNAF Bryman, Douglas TRIUMF Meyer, Curtis Carnegie Mellon University Burrows, Adam University of Arizona Meziani,

  9. R&D Plan for the High Temperature Membrane Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R&D Plan for the High Temperature Membrane Working Group Introduction/Background The High Temperature Membrane Working Group was established to provide a forum for greater interaction in the effort to develop high temperature membranes for PEM fuel cells. The goal of this effort is particularly challenging and requires significant fundamental research and development. The Working Group meets twice a year (immediately before or after the Electrochemical Society meeting) and includes

  10. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

  11. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

  12. TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup |

    Office of Environmental Management (EM)

    Department of Energy Intermodal Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup Intermodal Subgroup Draft Work Plan (206.83 KB) More Documents & Publications TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Intermodal Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group

  13. TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring...

    Office of Environmental Management (EM)

    Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup PDF icon Draft Work Plan - February 4,...

  14. September 2012, HSS Focus Group Strategic Initiatives Work Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Initiatives Work Group Status Overview Accomplishments: 1. June 26. Telecom with ... reporting improvements are planned for the next Strategic Initiatives Work Group meeting. ...

  15. UFD Working Group 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group 2015 - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Twitter Google + Vimeo GovDelivery SlideShare UFD Working Group 2015 HomeStationary ...

  16. Interagency Sustainability Working Group

    Broader source: Energy.gov [DOE]

    The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

  17. 21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans

    SciTech Connect (OSTI)

    1995-11-01

    The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

  18. SCM Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modeling Working Group Translator Update Shaocheng Xie Lawrence Livermore National Laboratory Outline 1. Data development in support of CMWG * Climate modeling best estimate data * ...

  19. TEC Working Group Topic Groups Rail Key Documents | Department...

    Office of Environmental Management (EM)

    Rail Key Documents TEC Working Group Topic Groups Rail Key Documents KEY DOCUMENTS Radiation Monitoring Subgroup Intermodal Subgroup Planning Subgroup Current FRA State Rail Safety ...

  20. AEO2016 Electricity Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    Office of Electricity, Coal, Nuclear, and Renewables Analysis December 8, 2015 | Washington, DC AEO2016 Electricity Working Group WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE What to look for: Electricity sector in AEO2016 * Inclusion of EPA final Clean Power Plan in Reference Case * Updated cost estimates for new generating technologies * Major data update on existing coal plant status: MATS- compliant technology or retirement

  1. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some serve as quiet

  2. TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup Draft Work Plan - February 4, 2008 (114.02 KB) More Documents & Publications TEC Working Group Topic Groups Rail Meeting Summaries TEC Working Group Topic Groups Rail Conference Call Summaries Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup

  3. Strategic Initiatives Work Group

    Broader source: Energy.gov [DOE]

    The Work Group, comprised of members representing DOE, contractor and worker representatives, provides a forum for information sharing; data collection and analysis; as well as, identifying best practices and initiatives to enhance safety performance and safety culture across the Complex.

  4. TEC Working Group Topic Groups Rail Conference Call Summaries Inspections

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup April 6, 2006 (14.05 KB) February 23, 2006 Draft (20.29 KB) January 24, 2006 (27.44 KB) More Documents & Publications TEC Working Group Topic Groups Rail Conference Call Summaries Planning Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Tracking Subgroup TEC Working Group Topic Groups Rail Conference

  5. Facilities removal working group

    SciTech Connect (OSTI)

    1997-03-01

    This working group`s first objective is to identify major economic, technical, and regulatory constraints on operator practices and decisions relevant to offshore facilities removal. Then, the group will try to make recommendations as to regulatory and policy adjustments, additional research, or process improvements and/or technological advances, that may be needed to improve the efficiency and effectiveness of the removal process. The working group will focus primarily on issues dealing with Gulf of Mexico platform abandonments. In order to make the working group sessions as productive as possible, the Facilities Removal Working Group will focus on three topics that address a majority of the concerns and/or constraints relevant to facilities removal. The three areas are: (1) Explosive Severing and its Impact on Marine Life, (2) Pile and Conductor Severing, and (3) Deep Water Abandonments This paper will outline the current state of practice in the offshore industry, identifying current regulations and specific issues encountered when addressing each of the three main topics above. The intent of the paper is to highlight potential issues for panel discussion, not to provide a detailed review of all data relevant to the topic. Before each panel discussion, key speakers will review data and information to facilitate development and discussion of the main issues of each topic. Please refer to the attached agenda for the workshop format, key speakers, presentation topics, and panel participants. The goal of the panel discussions is to identify key issues for each of the three topics above. The working group will also make recommendations on how to proceed on these key issues.

  6. Working Group Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K.

  7. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  8. TEC Working Group Topic Groups Rail Conference Call Summaries | Department

    Office of Environmental Management (EM)

    of Energy Rail Conference Call Summaries TEC Working Group Topic Groups Rail Conference Call Summaries CONFERENCE CALL SUMMARIES Rail Topic Group Inspections Subgroup Planning Subgroup Tracking Subgroup TRAGIS Subgroup Radiation Monitoring Subgroup Intermodel Subgroup

  9. Abandoning wells working group

    SciTech Connect (OSTI)

    1997-03-01

    The primary objective of this working group is to identify major technical, regulatory, and environmental issues that are relevant to the abandonment of offshore wellbores. Once the issues have been identified, the working group also has the objective of making recommendations or providing potential solutions for consideration. Areas for process improvement will be identified and {open_quotes}best practices{close_quotes} will be discussed and compared to {open_quotes}minimum standards.{close_quotes} The working group will primarily focus on wellbore abandonment in the Gulf of Mexico. However, workshop participants are encouraged to discuss international issues which may be relevant to wellbore abandonment practices in the Gulf of Mexico. The Abandoning Wells Group has identified several major areas for discussion that have concerns related to both operators and service companies performing wellbore abandonments in the Gulf of Mexico. The following broad topics were selected for the agenda: (1) MMS minimum requirements and state regulations. (2) Co-existence of best practices, new technology, and P & A economics. (3) Liability and environmental issues relating to wellbore abandonment.

  10. TEC Working Group Topic Groups Security Key Documents | Department of

    Office of Environmental Management (EM)

    Energy Key Documents TEC Working Group Topic Groups Security Key Documents Key Documents Security TG Work Plan August 7, 2006 (24.31 KB) Security Lessons Learned Document August 2, 2006 (40.77 KB) Security Module (635.1 KB) STG Terms and Definitions from DOE 470.4 (18.54 KB) More Documents & Publications TEC Working Group Topic Groups Security Meeting Summaries TEC Meeting Summaries - April 2005 Presentations TEC Working Group Topic Groups Security Conference Call Summaries

  11. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  12. Renewable Electricity Working Group Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewable Electricity Working Group Chris Namovicz, Renewable Electricity Analysis Team July 9, 2013 Agenda * Review status of AEO 2013 * Discuss new model updates and development efforts for AEO 2014 and future AEOs - Model updates - Policy updates - Planned additions updates - Performance updates * Obtain feedback from stakeholders on any key items that EIA should look at Chris Namovicz, July 9 2 Status of AEO 2013 Chris Namovicz, July 9 * AEO 2013 was released in stages this year - Reference

  13. Working Group Report: Sensors

    SciTech Connect (OSTI)

    Artuso, M.; et al.,

    2013-10-18

    Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

  14. Photoelectrochemical Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photoelectrochemical Working Group Photoelectrochemical Working Group The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water splitting. Its members include principal investigators and supporting personnel from U.S. Department of Energy (DOE)-funded photoelectrochemical projects. More information on planned DOE photoelectrochemical activities can be found in

  15. Reservoir Modeling Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reservoir Modeling Working Group Meeting 2012 GEOTHERMAL TECHNOLOGIES PROGRAM PEER REVIEW ... History Past Meetings: March 2010 IPGT Modeling Working Group Meeting May 2010 GTP Peer ...

  16. Buildings Sector Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    Group Forrestal 2E-069 July 22, 2013 2 * Residential projects - RECS update - Lighting model - Equipment, shell subsidies - ENERGY STAR benchmarking - Housing stock formation ...

  17. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan

    SciTech Connect (OSTI)

    D. E. Shanklin

    2006-06-01

    This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

  18. Training Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outreach Forums Focus Group and Work Group Activities Focus Group Training Work Group 10 CFR 851 Implementation Work Group Workforce Retention Work Group Strategic Initiatives Work ...

  19. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects: ---------------------------------------------------------------------------------------------------------- 1:00 pm - 1:05 pm Understanding and Improving CRM and GCM Simulations of Cloud Systems with ARM Observations (Xiaoqing Wu, Iowa State University) 1:05 pm - 1:10 pm Interactions of Cumulus Convection and the Boundary Layer at the Southern Great Plains ACRF (Steve Krueger, University of

  20. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  1. Wind Turbine Radar Interference Mitigation Working Group Releases...

    Broader source: Energy.gov (indexed) [DOE]

    Wind Turbine Radar Interference Mitigation Working Group to address these challenges. This new report lays out the plan for how the working group will address wind turbine radar ...

  2. Fall 2012 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 C STEC W orking G roup S chedule Thrust I --- s elected Thursdays; M SE C onference R oom ( 3062 H H D ow) October 1 1 Dylan B ayerl ( Kioupakis g roup) 3:00---4:00pm November 1 Andy M artin ( Millunchick g roup) 2:00---3:00pm December 1 3 Brian R oberts ( Ku g roup) 2:00---3:00pm Thrust II --- s elected T hursdays, 3 :30---4:30pm; M SE C onference R oom ( 3062 H H D ow) September 2 7 Hang C hi ( Uher g roup) October 1 8 Reddy g roup November 2 9 Gunho Kim (Pipe group) Thrust III --- s elected

  3. Macro-Industrial Working Group: meeting 1

    U.S. Energy Information Administration (EIA) Indexed Site

    July 24, 2012 Macroeconomic team: Kay Smith, Russ Tarver, Elizabeth Sendich and Vipin Arora WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Joint Macro-Industrial Working Group: Annual Energy Outlook 2013 Macroeconomic Modeling Plans Presentation Goals 2 July 24 2012 Joint Macroeconomics and Industrial Working Group * Highlight proposed macroeconomic AEO2013 modeling changes * Description of Proposed Reference Case - Highlight short-term

  4. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  5. Exascale Hardware Architectures Working Group

    SciTech Connect (OSTI)

    Hemmert, S; Ang, J; Chiang, P; Carnes, B; Doerfler, D; Leininger, M; Dosanjh, S; Fields, P; Koch, K; Laros, J; Noe, J; Quinn, T; Torrellas, J; Vetter, J; Wampler, C; White, A

    2011-03-15

    The ASC Exascale Hardware Architecture working group is challenged to provide input on the following areas impacting the future use and usability of potential exascale computer systems: processor, memory, and interconnect architectures, as well as the power and resilience of these systems. Going forward, there are many challenging issues that will need to be addressed. First, power constraints in processor technologies will lead to steady increases in parallelism within a socket. Additionally, all cores may not be fully independent nor fully general purpose. Second, there is a clear trend toward less balanced machines, in terms of compute capability compared to memory and interconnect performance. In order to mitigate the memory issues, memory technologies will introduce 3D stacking, eventually moving on-socket and likely on-die, providing greatly increased bandwidth but unfortunately also likely providing smaller memory capacity per core. Off-socket memory, possibly in the form of non-volatile memory, will create a complex memory hierarchy. Third, communication energy will dominate the energy required to compute, such that interconnect power and bandwidth will have a significant impact. All of the above changes are driven by the need for greatly increased energy efficiency, as current technology will prove unsuitable for exascale, due to unsustainable power requirements of such a system. These changes will have the most significant impact on programming models and algorithms, but they will be felt across all layers of the machine. There is clear need to engage all ASC working groups in planning for how to deal with technological changes of this magnitude. The primary function of the Hardware Architecture Working Group is to facilitate codesign with hardware vendors to ensure future exascale platforms are capable of efficiently supporting the ASC applications, which in turn need to meet the mission needs of the NNSA Stockpile Stewardship Program. This issue is

  6. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * No national standards for work quality * No portable and nationally recognized credentials for experienced WAP workers 3 NaConal Issues and Interests Supported the QWP * White ...

  7. AEO2014 Renewables Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    FOR: John Conti Assistant Administrator for Energy Analysis Alan Beamon Office Director, Office of Electricity, Coal, Nuclear, and Renewables Analysis FROM: Chris Namovicz, Renewable Electricity Analysis Team SUBJECT: AEO2014 Renewables Working Group Meeting This Renewables Working Group meeting on July 9, 2013 was the first of two, and focused on the assumptions and modeling efforts that EIA plans on using as the starting point for its AEO 2014 renewable electricity projections. The meeting was

  8. DOE - NNSA/NFO -- FRMAC Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Groups NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office FRMAC Working Groups As mandated by the Federal Radiological Emergency Response Plan, the U.S. Department of Energy will establish a Federal Radiological Monitoring and Assessment Center (FRMAC) should a potential or major radiological emergency arise. To maintain its capabilities for implementing a FRMAC, the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office's mission is to develop

  9. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    SciTech Connect (OSTI)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors

  10. TEC Working Group Topic Groups Archives Consolidated Grant Topic Group |

    Office of Environmental Management (EM)

    Department of Energy Consolidated Grant Topic Group TEC Working Group Topic Groups Archives Consolidated Grant Topic Group The Consolidated Grant Topic Group arose from recommendations provided by the TEC and other external parties to the DOE Senior Executive Transportation Forum in July 1998. It was proposed that the consolidation of multiple funding streams from numerous DOE sources into a single grant would provide a more equitable and efficient means of assistance to States and Tribes

  11. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  12. Interim remedial action work plan for the cesium plots at Waste Area Grouping 13 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This remedial action work plan (RAWP) is issued under the Federal Facility Agreement to provide a basic approach for implementing the interim remedial action (IRA) described in Interim Record of Decision for the Oak Ridge National Laboratory Waste Area Grouping 13 Cesium Plots, Oak Ridge, Tennessee. This RAWP summarizes the interim record of decision (IROD) requirements and establishes the strategy for the implementation of the field activities. As documented in the IROD document, the primary goal of this action is to reduce the risk to human health and the environment resulting from current elevated levels of gamma radiation on the site and at areas accessible to the public adjacent to the site. The major steps of this IRA are to: Excavate cesium-contaminated soil; place the excavated soils in containers and transport to Waste Area Grouping (WAG) 6; and backfill excavated plots with clean fill materials. The actual remedial action will be performed by Department of Energy prime contractor, MK-Ferguson of Oak Ridge Company. Remediation of the cesium plots will require approximately 60 days to complete. During this time, all activities will be performed according to this RAWP and the applicable specifications, plans, and procedures referred to in this document. The IRA on WAG 13 will prevent a known source of cesium-contaminated soil from producing elevated levels of gamma radiation in areas accessible to the public, eliminate sources of contamination to the environment, and reduce the risks associated with surveillance and maintenance of the WAG 13 site.

  13. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1997-12-31

    This report is a compilation of the vugraphs presented at this meeting. Presentations covered are: CFCC Working Group; Overview of study on applications for advanced ceramics in industries for the future; Design codes and data bases: The CFCC program and its involvement in ASTM, ISO, ASME, and military handbook 17 activities; CFCC Working Group meeting (McDermott Technology); CFCC Working Group meeting (Textron); CFCC program for DMO materials; Developments in PIP-derived CFCCs; Toughened Silcomp (SiC-Si) composites for gas turbine engine applications; CFCC program for CVI materials; Self-lubricating CFCCs for diesel engine applications; Overview of the CFCC program`s supporting technologies task; Life prediction methodologies for CFCC components; Environmental testing of CFCCs in combustion gas environments; High-temperature particle filtration ORNL/DCC CRADA; HSCT CMC combustor; and Case study -- CFCC shroud for industrial gas turbines.

  14. TEC Working Group Topic Groups Routing Key Documents | Department of Energy

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Routing Key Documents KEY DOCUMENTS Proposed Task Plan - Routing Topic Group (53.69 KB) More Documents & Publications TEC Working Group Topic Groups Routing Conference Call Summaries TEC Working Group Topic Groups Rail Key Documents TEC Meeting Summaries - September 2006

  15. BEDES Strategic Working Group Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Energy Data Exchange Specification: Strategic Working Group Recommendations Rick Diamond, Robin Mitchell, Andrea Mercado, Shankar Earni, and Lindsay Holiday Lawrence Berkeley National Laboratory Jonathan Raab, Raab Associates October 27, 2014 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of

  16. Transport Modeling Working Group Meeting Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Modeling Working Group Meeting Reports Transport Modeling Working Group Meeting Reports View reports from meetings of the Transport Modeling Working Group, which meets twice per ...

  17. Water Electrolysis Working Group | Department of Energy

    Office of Environmental Management (EM)

    Water Electrolysis Working Group Water Electrolysis Working Group The Water Electrolysis Working Group, inaugurated in May 2007, brings industry, academia, and national ...

  18. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  19. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  20. Interagency Sustainability Working Group | Department of Energy

    Energy Savers [EERE]

    Facilities Sustainable Buildings & Campuses Interagency Sustainability Working Group ... Working Group (ISWG) is the coordinating body for sustainable federal buildings. ...

  1. Environmental Justice Interagency Working Group releases "Promising...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Justice Interagency Working Group releases "Promising Practices for EJ Methodologies in NEPA Reviews" Environmental Justice Interagency Working Group releases ...

  2. Working Group Presentation for Discussion

    U.S. Energy Information Administration (EIA) Indexed Site

    1, 2016 MEMORANDUM FOR: IAN MEAD ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JIM TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION AND EFFICIENCY ANALYSIS FROM: TRANSPORTATION CONSUMPTION AND EFFICIENCY ANALYSIS TEAM SUBJECT: Annual Energy Outlook (AEO)2017 Transportation Working Group Meeting Summary (presented on 08-31-2016) Attendees: David Daniels (EIA) Mindi Farber-DeAnda (EIA) Devi Mishra (EIA) Alicia Birky (Energetics) Sarah Garman (DOE)

  3. TEC Working Group Topic Groups Routing Meeting Summaries | Department of

    Office of Environmental Management (EM)

    Energy Meeting Summaries TEC Working Group Topic Groups Routing Meeting Summaries MEETING SUMMARIES Atlanta TEC Meeting, Routing Topic Group Summary (101.72 KB) More Documents & Publications TEC Meeting Summaries - January - February 2007 TEC Working Group Topic Groups Rail Meeting Summaries TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group

  4. DOE Catalysis Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    16, 2014 Marriott Wardman Park Hotel 2660 Woodley Road NM, Washington, D.C. 8:30 - 9:00 Continental breakfast: breads, coffee, tea Joint Durability and Catalysis Working Groups Meeting Delaware A 9:00 - 9:05 Welcome & introductory comments DWG co-chairs - Debbie Myers (ANL), Rod Borup (LANL), Donna Ho (DOE); CWG co-chairs - Piotr Zelenay (LANL), Nancy Garland (DOE) 9:05 - 9:25 Are We There Yet? Pt-Alloy Catalyst - Anu Kongkanand (GM) 9:25 - 9:45 Pt-Co/C Catalysts: PEMFC Performance and

  5. TEC Working Group Topic Groups Routing

    Broader source: Energy.gov [DOE]

    The Routing Topic Group has been established to examine topics of interest and relevance concerning routing of shipments of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to a...

  6. TEC Working Group Topic Groups Manual Review

    Broader source: Energy.gov [DOE]

    This group is responsible for the update of DOE Manual 460.2-1, Radioactive Material Transportation Practices Manual.  This manual was issued on September 23, 2002, and establishes a set of...

  7. Work Force Retention Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Retention Work Group Charter Work Force Retention Work Group Charter The Work force Retention Work Group is established to support the Department's critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOE's national security mission are reaching retirement age. Work Force Retention Work Group Charter (86.92 KB) More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Training

  8. Mixed Waste Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-09

    The treatment of mixed waste remains one of this country`s most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country`s largest mixed waste generator, responsible for 95 percent of the Nation`s mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE`s earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies.

  9. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  10. TEC Working Group Topic Groups Section 180(c) Meeting Summaries |

    Office of Environmental Management (EM)

    Department of Energy Section 180(c) Meeting Summaries TEC Working Group Topic Groups Section 180(c) Meeting Summaries Meeting Summaries Washington, DC TEC Meeting - 180(c) Group Summary - March 15, 2006 (29.33 KB) More Documents & Publications TEC Working Group Topic Groups Tribal Meeting Summaries TEC Meeting Summaries - July 2007 TEC Working Group Topic Groups Tribal Conference Call Summaries

  11. TWRS Systems Engineering Working Plan

    SciTech Connect (OSTI)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  12. Work Plans & Manuals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

  13. TEC Working Group Topic Groups Rail Meeting Summaries | Department...

    Office of Environmental Management (EM)

    TEC Working Group Topic Groups Rail Meeting Summaries MEETING SUMMARIES PDF icon Kansas City TEC Meeting, Rail Topic Group Summary - July 25, 2007 PDF icon Atlanta TEC...

  14. TEC Working Group Topic Groups Security | Department of Energy

    Office of Environmental Management (EM)

    TEC Working Group Topic Groups Security The Security Topic group is comprised of regulators, law enforcement officials, labor and industry representatives and other subject matter ...

  15. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group PDF icon May 17, 2007 PDF icon January 16, 2007 PDF icon...

  16. TEC Working Group Member Organizations Representatives | Department...

    Office of Environmental Management (EM)

    Member Organizations Representatives TEC Working Group Member Organizations Representatives PDF icon TEC MEMBER ORGANIZATION REPRESENTATIVES TOPIC GROUP PARTICIPATION February 2006...

  17. Federal Utility Partnership Working Group Seminar: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility Partnership Working Group Seminar: Chairman's ...

  18. Federal Utility Partnership Working Group Meeting: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Meeting: Chairman's Corner Presentation-given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting-lists key ...

  19. Federal Utility Partnership Working Group Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Meeting: Washington Update PDF icon fupwgspring12unruh.pdf More Documents & Publications Federal Utility Partnership Working Group ...

  20. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1995-12-31

    The theme of the meeting was ``A Path to Commercialization`` and discussion was devoted to addressing the nearest-term products and the time frame for implementation. The objectives of the meeting were to identify the barriers to commercialization, methods to overcome these barriers, and the actions required to achieve success. The meeting was planned to bring together government agencies and industry customers and, suppliers to discuss and conclude where the CFCC Program is today, where it is going, and how they plan to get there. It was also planned to join component developers with end users who can describe systems needs and projected schedules for introducing CFCC components in industrial applications.

  1. TEC Working Group Topic Groups Archives Communications Meeting Summaries |

    Office of Environmental Management (EM)

    Department of Energy Archives Communications Meeting Summaries TEC Working Group Topic Groups Archives Communications Meeting Summaries Meeting Summaries Milwaukee TEC Meeting, Communications Topic Group Summary - July 1998 (58.3 KB) Inaugural Group Meeting - April 1998 (83.34 KB) More Documents & Publications TEC Working Group Topic Groups Archives Communications Conference Call Summaries TEC Meeting Summaries - January 1997 TEC Working Group Topic Groups Tribal Conference Call

  2. CHARTER INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORK GROUP

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHARTER INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORK GROUP Official Designation Indian Country Energy and Infrastructure Working Group ("Working Group") Purpose The purpose of the Working Group is to provide advice and recommendations to the Director of the Office of Indian Energy Policy & Programs (OIE) and the Secretary of Energy with respect to the strategic planning and implementation of OIE's energy resource, energy business and energy infrastructure development policy and

  3. Workforce Retention Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Retention Work Group Workforce Retention Work Group The Workforce Retention Work Group was established to collaboratively address the needs of the Department to maintain a skilled work force in the face of anticipated retirements and to address the specific health and safety concerns of that work force that could impede retention. Due to the broad nature of the issues reflected within this working group, the chartered objectives and outcomes have been moved forward to be worked by the

  4. TEC Working Group Topic Groups Rail | Department of Energy

    Office of Environmental Management (EM)

    The group's current task is to examine different aspects of rail transportation including inspections, tracking and radiation monitoring, planning and process, and review of ...

  5. FINAL Transportation External Coordination Working Group (TEC...

    Office of Environmental Management (EM)

    ... Put another way, one question for the group could be, what are the real problems ... and to learn more about other agencies participating in transportation and emergency planning. ...

  6. TEC Working Group Topic Groups Archives Communications Conference Call

    Office of Environmental Management (EM)

    Summaries | Department of Energy Communications Conference Call Summaries TEC Working Group Topic Groups Archives Communications Conference Call Summaries Conference Call Summaries Conference Call Summary April 2000 (91.86 KB) Conference Call Summary February 1999 (11.81 KB) Conference Call Summary November 1998 (54.77 KB) More Documents & Publications TEC Working Group Topic Groups Archives Communications Meeting Summaries TEC Working Group Topic Groups Tribal Conference Call Summaries

  7. TEC Working Group Topic Groups Rail Archived Documents | Department of

    Office of Environmental Management (EM)

    Energy Archived Documents TEC Working Group Topic Groups Rail Archived Documents ARCHIVED DOCUMENTS Inspections Summary Matrix (49.36 KB) TEC Transportation Safety WIPP-PIG Rail Comparison (130.46 KB) Regulatory Summary Matrix (62.08 KB) More Documents & Publications TEC Working Group Topic Groups Rail Key Documents TEC Working Group Topic Groups Rail Meeting Summaries TEC Meeting Summaries - September 2005 Presentations

  8. TEC Working Group Topic Groups Security Meeting Summaries | Department of

    Office of Environmental Management (EM)

    Energy Meeting Summaries TEC Working Group Topic Groups Security Meeting Summaries Meeting Summaries Green Bay STG Meeting Summary- September 14, 2006 (28.22 KB) Washington STG Meeting Summary - March 14, 2006 (25.61 KB) Pueblo STG Meeting Summary - September 22, 2005 (18.7 KB) More Documents & Publications TEC Working Group Topic Groups Security Conference Call Summaries TEC Meeting Summaries - September 2006 TEC Working Group Topic Groups Security Key Documents

  9. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup PDF icon April 6, 2006 PDF icon February 23,...

  10. TEC Working Group Topic Groups Archives Mechanics of Funding...

    Office of Environmental Management (EM)

    Mechanics of Funding and Techical Assistance TEC Working Group Topic Groups Archives Mechanics of Funding and Techical Assistance Mechanics of Funding and Techical Assistance Items...

  11. TEC Working Group Topic Groups Tribal Conference Call Summaries...

    Office of Environmental Management (EM)

    Conference Call Summaries TEC Working Group Topic Groups Tribal Conference Call Summaries Conference Call Summaries PDF icon March 12, 2008 PDF icon October 3, 2007 PDF icon...

  12. TEC Working Group Topic Groups Archives Communications Conference...

    Office of Environmental Management (EM)

    Communications Conference Call Summaries TEC Working Group Topic Groups Archives Communications Conference Call Summaries Conference Call Summaries PDF icon Conference Call Summary...

  13. TEC Working Group Topic Groups Archives Communications Meeting...

    Office of Environmental Management (EM)

    Archives Communications Meeting Summaries TEC Working Group Topic Groups Archives Communications Meeting Summaries Meeting Summaries PDF icon Milwaukee TEC Meeting, Communications...

  14. TEC Working Group Topic Groups Section 180(c) Key Documents ...

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Section 180(c) Key Documents Key Documents Briefing Package for Section 180(c) Implementation - July 2005 PDF icon Executive Summary...

  15. ILDG Middleware Working Group Status Report

    SciTech Connect (OSTI)

    B. Joo; W. Watson

    2004-09-01

    We report on the status of the ILDG Middleware Working Group. The Middleware Working Group was formed with the aim of designing standard middleware to allow the interoperation of the data grids of ILDG member collaborations. Details of the working group are given. In this contribution we outline the role of middleware in the ILDG, present our proposed middleware architecture and discuss our current status and future work within the working group.

  16. Focus Group Training Work Group Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Date: September 13, 2012 In conjunction with the HAMMER Steering Committee meeting the HSS Focus Group Training Working Group Meeting was conducted from 2:00 PM to 4:30 PM at the HAMMER Training Facility in Richland, WA. Documents Available for Download Meeting Agenda (43.92 KB) Meeting Summary (1.22 MB) More Documents & Publications Focus Group Training Work Group Meeting DOE Training Reciprocity Program Training Work Group Charter

  17. Federal Utility Partnership Working Group Purpose, Policies,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Purpose, Policies, and Operations Draft document (last updated in 2010) discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group. ...

  18. Fiscal Year 2015 Annual Work Plan Update

    Broader source: Energy.gov [DOE]

    At the February 18, 2015 Committee meeting Overview and Synopsis of the Work Planned for FY'15 at LANL

  19. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  20. TEC Working Group Topic Groups Archives Protocols Meeting Summaries |

    Office of Environmental Management (EM)

    Department of Energy Protocols Meeting Summaries TEC Working Group Topic Groups Archives Protocols Meeting Summaries Meeting Summaries Philadelphia TEC Meeting, Protocols Topic Group Summary - July 1999 (110.63 KB) Jacksonville TEC Meeting, Protocols Topic Group Summary - January 1999 (102.04 KB) More Documents & Publications TEC Working Group Topic Groups Archives Protocols Conference Call Summaries TEC Meeting Summaries - July 1997 TEC Meeting Summaries - January 1997

  1. Work Plan FY 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plan FY 2016 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 A list of audits and inspections planned for FY 2016 by the U.S. Department of Energy, Office of Inspector General, Office of Audits and Inspections Work Plan FY 2016 (218.5 KB) More Documents & Publications Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Planned Audits and Inspections FY 2013 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs

  2. Federal Utility Partnership Working Group Seminar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Partnership Working Group Seminar Jim Henning - President, Duke Energy Ohio & Kentucky 3 Creative Collaborations Federal Utility Partnership Working Group Seminar Jim Henning - President, Duke Energy Ohio & Kentucky

  3. Hydrogen Pipeline Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline Working Group Hydrogen Pipeline Working Group The Hydrogen Pipeline Working Group of research and industry experts focuses on issues related to the cost, safety, and reliability of hydrogen pipelines. Participants represent organizations conducting hydrogen pipeline research for the Department of Energy to better understand and minimize hydrogen embrittlement and to identify improved and new materials for hydrogen pipelines. Hydrogen Pipeline Working Group Workshops: September 25-26,

  4. EM QA Working Group September 2011 Notes

    Broader source: Energy.gov [DOE]

    Meeting minutes and notes from the EM QA Working Group video conference meeting held in September 2011.

  5. NEMS Buildings Sector Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    NEMS Buildings Sector Working Group Meeting Erin Boedecker Owen Comstock Behjat Hojjati Kevin Jarzomski David Peterson Steve Wade October 4, 2012 | Washington, D.C. AEO2013 Preliminary Results WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview Buildings Working Group Forrestal 2E-069 | October 4, 2012 2 * Recap of project list

  6. TEC Working Group Topic Groups Archives | Department of Energy

    Office of Environmental Management (EM)

    Archives TEC Working Group Topic Groups Archives The following Topic Groups are no longer active; however, related documents and notes for these archived Topic Groups are available through the following links: Communications Consolidated Grant Topic Group Training - Medical Training Protocols Route Identification Process Mechanics of Funding and Technical Assistance

  7. Buildings Working Group Meeting AEO2016 Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Buildings Working Group Meeting Office of Energy Consumption and Efficiency Analysis February 18, 2016 | Washington, DC By Buildings Energy Analysis Team AEO2016 Preliminary Results Discussion purposes only - do not cite or circulate Overview * Key policies - Clean Power Plan - Federal standards and ENERGY STAR specifications * Sector drivers - Fuel prices - Weather - Commercial floorspace * Distributed generation * Residential and commercial consumption AEO2016 Buildings Working Group,

  8. Hadron Colliders Working Group Report

    SciTech Connect (OSTI)

    S. Peggs and M.J. Syphers

    2001-11-08

    The ''point design'' studied this year shows that a staged VLHC (40, {approx} 200 TeV) is feasible, with no insurmountable challenges. Further work can provide a more optimized design, by studying various alternative field strengths (e.g., superferric magnets for Stage 1) for improvements to vacuum, wall impedance, and other major performance parameters. It may be that a ''single-stage'' scenario for accessing higher energies sooner is the correct approach. A next-step design study should be considered to look at the two cases near to and complementary to the 2001 VLHC Design Study. The effectiveness of photon stops and their engineering design need to be addressed in the near future to truly determine if these devices can lead this effort to even higher luminosities and energies. The superbunch approach should continue to be studied, as well as IR designs, new instrumentation and diagnostics, and beam dynamics issues. Finally, a well organized VLHC-motivated beam studies effort should become part of the national program.

  9. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  10. TEC Working Group Topic Groups | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Topic Groups TEC Working Group Topic Groups TEC Topic Groups were formed in 1991 following an evaluation of the TEC program. Interested members, DOE and other federal agency staff meet to examine specific issues related to radioactive materials transportation. TEC Topic Groups enable a small number of participants to focus intensively on key issues at a level of detail that is unattainable during the TEC semiannual meetings due to time and group size constraints. Topic Groups meet individually

  11. Working Group Report: Lattice Field Theory

    SciTech Connect (OSTI)

    Blum, T.; et al.,

    2013-10-22

    This is the report of the Computing Frontier working group on Lattice Field Theory prepared for the proceedings of the 2013 Community Summer Study ("Snowmass"). We present the future computing needs and plans of the U.S. lattice gauge theory community and argue that continued support of the U.S. (and worldwide) lattice-QCD effort is essential to fully capitalize on the enormous investment in the high-energy physics experimental program. We first summarize the dramatic progress of numerical lattice-QCD simulations in the past decade, with some emphasis on calculations carried out under the auspices of the U.S. Lattice-QCD Collaboration, and describe a broad program of lattice-QCD calculations that will be relevant for future experiments at the intensity and energy frontiers. We then present details of the computational hardware and software resources needed to undertake these calculations.

  12. Nevada Working Group (JOWOG 32 HDT)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNevada Working Group Meeting (JOWOG 32 HDT) Radiographs Nevada Working Group Meeting (JOWOG 32 HDT) 11-13 April 2016, Los Alamos National Laboratory The Nevada Working group meeting (NVWG) brings together the teams working jointly in subcritical experiments at the Nevada test site. NVWG meeting will be starting on Monday morning through lunchtime Wednesday, 11-13 April 2016 at Los Alamos National Laboratory and it is hosted under the auspices of JOWOG 32 HDT. This workshop will be

  13. Training Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Charter Training Work Group Charter The Training Work Group fosters improvements in the quality, efficacy, and delivery of DOE safety training, and realizes significant efficiencies by minimizing redundancies across the DOE Complex. The Work Group provides a collaborative opportunity for DOE to gain insights from operating contractors, the contractor work force and their representatives, and to combine the best wisdom to assure that the most efficient and effective worker health and safety

  14. CRAD, Work Controls Assessment Plan

    Broader source: Energy.gov [DOE]

    Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed.

  15. WASTE AREA GROUP 7 PROPOSED PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AREA GROUP 7 PROPOSED PLAN The Idaho National Laboratory (INL) Citizens Advisory Board (CAB) has provided its input to the Department of Energy on the Waste Area Group 7 (WAG 7)...

  16. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary - Training Work Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Work Group Co-Lead Telecom November 16, 2012 DRAFT Discussion Overview Purpose: This HSS Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized leadership and oversight by representatives

  17. September 13, 2012, HSS Focus Group Training Working Group (TWG...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 082912 HSS Focus Group Training Working Group (TWG) Meeting September 13, 2012 Room 67 HAMMER 2:00 PM - 4:30 PM Time Topic Lead 2:00 p.m. Safety Minute Welcome and ...

  18. TEC Working Group Topic Groups Archives Protocols | Department of Energy

    Office of Environmental Management (EM)

    Protocols TEC Working Group Topic Groups Archives Protocols The Transportation Protocols Topic Group serves as an important vehicle for DOE senior managers to assess and incorporate stakeholder input into the protocols process. The Topic Group was formed to review a series of transportation protocols developed in response to a request for DOE to be more consistent in its approach to transportation.

  19. September 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 Protective Force ...

  20. Transuranic Waste Transportation Working Group Agenda

    Office of Environmental Management (EM)

    States Energy Board Joint Meeting of the Radioactive Materials Transportation Committee and the Transuranic Waste Transportation Working Group The Hilton Knoxville Knoxville, Tennessee May 15, 2012 Tuesday, May 15, 2012 8:30 a.m. Breakfast 9:30 a.m. Welcome / Opening Remarks / Introductions - Christopher Wells, Southern States Energy Board - Sandra Threatt, Chair, SSEB Radioactive Materials Transportation Working Group - Elgan Usrey, Chair, SSEB Transuranic Waste Transportation Working Group

  1. Catalysis Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalysis Working Group Catalysis Working Group The Catalysis Working Group (CWG) meets twice per year to exchange information, create synergies, and collaboratively develop both an understanding of and tools for studying electrocatalysis for polymer electrolyte fuel cells (PEFCs) and other low- and intermediate-temperature fuel cell systems, including direct methanol fuel cells (DMFCs), alkaline fuel cells (AFCs), alkaline membrane fuel cells (AMFCs), and phosphoric acid fuel cells (PAFCs). The

  2. Workforce Retention Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Due to the broad nature of the issues reflected within this working group, the chartered objectives and outcomes have been moved forward to be worked by the larger labor management ...

  3. Risk Assessment Technical Experts Working Group

    Broader source: Energy.gov [DOE]

    The Risk Assessment Technical Experts Working Group (RWG) was established to assist DOE in the appropriate and effective use of quantitative risk assessment in nuclear safety related activities.

  4. September 2012, Training Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's ... Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in ...

  5. Federal Utility Partnership Working Group - Utility Interconnection...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group (FUPWG) meeting-discusses solarphotovoltaic (PV) projects to connect with utility in California and their issues. fupwgfall12jewell.pd...

  6. ASRAC MREF Working Group Notice of Intent

    Broader source: Energy.gov (indexed) [DOE]

    rulemaking process, and instead explore openly with other parties all ideas that may emerge from the working group's discussions. E. Facilitator The facilitator will act as a...

  7. Federal Utility Partnership Working Group Meeting Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting-lists key utility program projects and upcoming utility energy service contract (UESC) training. fupwgfall12...

  8. Macro-Industrial Working Group: meeting 1

    U.S. Energy Information Administration (EIA) Indexed Site

    30 2013 Macroeconomic team: Kay Smith, Russ Tarver, Elizabeth Sendich and Vipin Arora ... concepts that other NEMS modules use Kay Smith, Macroeconomic Industrial Working Group ...

  9. July 2012, HSS Focus Group Strategic Initiatives Work Group - Status Overviews

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Initiatives Work Group Status Overview Accomplishments: 1. June 26. Telecom with USW - Informative near-miss occurrence reporting. 2. June 29. HS-24 finalized and released the Injury and Illness Dashboard. Near Term Goals/Activities: 1. Work Group meeting to be scheduled - address union-expressed issues related to under reporting/near miss reporting; presentation of Injury and Illness Dashboard tool. 2. Work Group action plan to be further developed based on the meeting discussion.

  10. TEC Working Group Topic Groups Tribal | Department of Energy

    Office of Environmental Management (EM)

    Energy Meeting Summaries TEC Working Group Topic Groups Tribal Meeting Summaries Meeting Summaries Kansas City TEC Meeting - Tribal Group Summary - July 25, 2007 (29.33 KB) Atlanta TEC Meeting - Tribal Group Summary - March 6, 2007 (27.82 KB) Green Bay TEC Meeting -- Tribal Group Summary - October 26, 2006 (31.56 KB) Washington TEC Meeting - Tribal Topic Group Summary - March 14, 2006 (39.76 KB) Pueblo TEC Meeting - Tribal Topic Group Summary, September 22, 2005 (40.34 KB) Phoenix TEC

  11. TEC Working Group Topic Groups Tribal Meeting Summaries | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Tribal Meeting Summaries TEC Working Group Topic Groups Tribal Meeting Summaries Meeting Summaries Kansas City TEC Meeting - Tribal Group Summary - July 25, 2007 (29.33 KB) Atlanta TEC Meeting - Tribal Group Summary - March 6, 2007 (27.82 KB) Green Bay TEC Meeting -- Tribal Group Summary - October 26, 2006 (31.56 KB) Washington TEC Meeting - Tribal Topic Group Summary - March 14, 2006 (39.76 KB) Pueblo TEC Meeting - Tribal Topic Group Summary, September 22, 2005 (40.34 KB) Phoenix TEC

  12. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 10/08/2013 December (no committee mtgs) January February PNNL update on geophysics characterization (where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RI/FS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice 100-N Groundwater Modeling Tutorial Update on Orchard Lands Work Plan o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice Online

  13. July 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group

  14. TEC Working Group Topic Groups Archives Communications | Department of

    Office of Environmental Management (EM)

    Energy Communications TEC Working Group Topic Groups Archives Communications The Communications Topic Group was convened in April 1998 to improve internal and external strategic level communications regarding DOE shipments of radioactive and other hazardous materials. Major issues under consideration by this Topic Group include: - Examination of DOE external and internal communications processes; - Roles and responsibilities when communicating with a diverse range of stakeholders; and -

  15. TEC Working Group Topic Groups Archives Training - Medical Training |

    Office of Environmental Management (EM)

    Department of Energy Training - Medical Training TEC Working Group Topic Groups Archives Training - Medical Training The TEC Training and Medical Training Issues Topic Group was formed to address the training issues for emergency responders in the event of a radioactive material transportation incident. The Topic Group first met in 1996 to assist DOE in developing an approach to address radiological emergency response training needs and to avoid redundancy of existing training materials. The

  16. Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    Portland, Oregon - February 6-7, 2001 Transportation External Coordination Working Group (TEC) February 6-7, 2001 Portland, Oregon Meeting Summary The Transportation External Coordination Working Group (TEC) held its 18 th semi-annual meeting February 6-7, 2001, in Portland, Oregon. Attending were 125 representatives from national, State, Tribal and local government organizations, industry and professional groups and other interested parties/DOE programs who meet to address a variety of issues

  17. TEC Working Group Topic Groups Routing Conference Call Summaries |

    Office of Environmental Management (EM)

    Department of Energy Routing Conference Call Summaries TEC Working Group Topic Groups Routing Conference Call Summaries CONFERENCE CALL SUMMARIES January 31, 2008 (11.6 KB) December 6, 2007 (11.96 KB) October 4, 2007 (16.46 KB) August 23, 2007 (26.38 KB) June 21, 2007 (41.02 KB) May 31, 2007 (31.04 KB) January 18, 2007 (93.16 KB) December 19, 2006 (28.83 KB) November 9, 2006 (19.84 KB) More Documents & Publications TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic

  18. TEC Working Group Topic Groups Security Conference Call Summaries |

    Office of Environmental Management (EM)

    Department of Energy Conference Call Summaries TEC Working Group Topic Groups Security Conference Call Summaries Conference Call Summaries August 17, 2006 (Draft) (17.12 KB) July 18, 2006 (Draft) (14.08 KB) June 20, 2006 (Draft) (16.18 KB) April 18, 2006 (27.83 KB) February 21, 2006 (32.98 KB) January 24, 2006 (19.36 KB) December 20, 2005 (13.79 KB) November 17, 2005 (17.52 KB) October 18, 2005 (18.51 KB) May 8, 2005 (29.42 KB) More Documents & Publications TEC Working Group Topic Groups

  19. DOE Durability Working Group Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group Meeting Monday, June 16, 2014, 9:00 am to 12:00 pm Washington Marriott Wardman Park 2660 Woodley Road NW Washington, D.C. 8:30 am Continental "breakfast": breakfast breads, coffee, and tea 9:00 am Joint Durability and Catalysis Working Groups Meeting (Delaware A Room) Welcome and introductory comments Debbie Myers (Argonne), Rod Borup (LANL), Donna Ho (DOE), Piotr Zelenay (LANL), and Nancy Garland (DOE) co-chairs of Durability and Catalysis Working Groups

  20. TEC Working Group Topic Groups Archives Route Identification Process |

    Office of Environmental Management (EM)

    Department of Energy Route Identification Process TEC Working Group Topic Groups Archives Route Identification Process Route Identification Process Items Available for Download Routing Discussion Paper (April 1998) (71.87 KB) More Documents & Publications TEC Meeting Summaries - January 1997 TEC Meeting Summaries - July 1997 TEC Meeting Summaries - January 1998

  1. Focus Group Training Work Group Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dates: July 10 - 11 The Focus Group Training Work Group met at the DOE National Training Center (NTC) inAlbuquerque, NM on Tuesday, July 10 and Wednesday, July 11, 2012. The meeting was chaired by the Work Group co-chairs, Karen Boardman,Pete Stafford (AFL-CIO BCTD/CPWR), and Julie Johnston (EFCOG). Attachment 1 is the Meeting Agenda; Attachment 2 is a list of meeting attendees; and Attachment3 is the proposed Radworker Training Reciprocity Program. Documents Available for Download Meeting

  2. RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

  3. Federal Utility Partnership Working Group Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) ... Program (FEMP) activities, and more. fupwgfall12unruh.pdf (184.82 KB) More Documents & ...

  4. Federal Utility Partnership Working Group Seminar Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Linda Collins, General Services Administration 2:30pm Adjourn 2:40 - 6:00pm Optional Tour: KSC Space Shuttle Atlantis Exhibit 103014 Federal Utility Partnership Working Group ...

  5. W Boson Mass Working Group Report

    SciTech Connect (OSTI)

    Kilgore, W.; Kilgore, W.

    2010-06-14

    The W boson mass working group discussed the current status of the W boson mass measurement and the prospects for improving on LEP and Tevatron measurements at the LHC.

  6. Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    Transportation External Coordination Working Group (TEC) July 17-19, 2001 Cincinnati, Ohio Meeting Summary The Transportation External Coordination Working Group (TEC) held its 19 th semi-annual meeting July 17-19, 2001, in Cincinnati, Ohio. One hundred fifteen people attended (see Appendix A for listing of participants). Jim Carlson, U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and TEC co-chair, welcomed participants to the meeting. He then introduced

  7. The transportation external coordination working group

    SciTech Connect (OSTI)

    1995-10-01

    In an effort to improve coordinated interactions between the United States Department of Energy (DOE) and external groups interested in transportation activities, DOE established the Transportation External Coordination Working Group (TEC/WG). Membership includes representatives from State, Tribal and local governments, industry, and professional organizations. All DOE programs with significant transportation programs participate.

  8. U.S.-India Coal Working Group Terms of Reference | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S.-India Coal Working Group Terms of Reference U.S.-India Coal Working Group Terms of Reference U.S.-India Coal Working Group Terms of Reference (18.39 KB) More Documents & Publications Work Plan - U.S.-India Coal Working Group US-India S&T Agreement US-India FOA submission form

  9. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/18/15 (Blue titles indicate those topics specifically identified in the 2015 HAB Work Plan; Italicized items indicate tentative) February March April Committee Call 2/18 Committee Call Placeholder 3/18 Committee Mtg Placeholder 4/7 (1 p.m. - 5 p.m.) Committee Business o Update 3-month committee work plan o Round-robin of HAB member outreach Debrief TPA Agency Public Involvement Events o What worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC

  10. TEC Working Group Members | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Members TEC Working Group Members TEC members represent many different national, regional, tribal, state and local governmental, labor, industry and professional groups. To maximize the opportunity for broad-based input and information exchange, no single state, local or tribal governmental, or other entity is itself a member. Instead, membership is composed of organizations representing those perspectives. DOE programs participate in TEC by providing regular updates on key activities and

  11. DOE Durability Working Group May 2015 Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group Meeting Thursday, May 28, 2015, 2:00 pm to 6:00 pm Argonne National Laboratory 9700 S. Cass Avenue, Lemont, IL Energy Sciences Building, Building 241, Room A323 2:00 pm Arrive and get settled. (Substantial refreshments available, i.e., not dinner, but enough to get you by until after 6 pm). 2:05 pm Welcome and introductory comments Debbie Myers (Argonne), Rod Borup (LANL), Donna Ho (DOE), Co-chairs of Durability Working Group 2:10 pm Discussion of Durability

  12. Reservoir Modeling Working Group Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reservoir Modeling Working Group Meeting Reservoir Modeling Working Group Meeting Reservoir Modeling working group meeting presentation on May 10, 2012 at the 2012 Peer Review ...

  13. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  14. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5/12/15 Facilitator notes in blue June Committee meeting placeholder: Tuesday, June 16 Call placeholder: Tuesday, June 23, 1:30 p.m. August Committee meeting placeholder: Tuesday, August 4 Call placeholder: Tuesday, August 11, 1:30 p.m. September Committee meeting placeholder: Tuesday, Sept. 22 Call placeholder: Tuesday, Sept. 29, 1:30 p.m.  No topics planned for June meeting  RI/FS work plans for SW-2, WA-1, and DV-1  200 Area groundwater remediation (follow up, 100-N)  Call planned

  15. Burn site groundwater interim measures work plan.

    SciTech Connect (OSTI)

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  16. Summary of the impedance working group

    SciTech Connect (OSTI)

    Chao, A.W.

    1995-05-01

    The impedance working group concentrated on the LHC design during the workshop. They look at the impedance contributions of liner, beam position monitors, shielded bellows, experimental chambers, superconducting cavities, recombination chambers, space charge, kickers, and the resistive wall. The group concluded that the impedance budgeting and the conceptual designs of the vacuum chamber components looked basically sound. It also noted, not surprisingly, that a large amount of studies are to be carried out further, and it ventured to give a partial list of these studies.

  17. Meeting Summary, Credit Trading Work Group

    SciTech Connect (OSTI)

    Kevin Bryan

    2000-12-07

    OAK-B135 Credit Trading Work Group Meeting Summary. The purpose of the meeting is to: (1) Provide an opportunity for NWCC Work Group Members, NWCC Members, and invited expert participants to hear an overview of the draft NWCC Credit Trading Report and to critically review and discuss the report's recommendations and principles. (2) Hear presentations from several perspectives of other experts on credit trading which provide: (a) a brief summary of credit trading activities they are involved in, and (b) critical responses to the NWCC draft report. (3) Identify how the report can be improved at the big picture level. Attempt to resolve issues or concerns if necessary. (4) Discuss the recommendations and credit trading principles in detail and attempt to reach consensus on these sections for presentation to the NWCC. (5) Discuss if any of the outreach and communication recommendations in the report should be conducted by the NWCC.

  18. Hanford Advisory Board FY2014 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/2013 Hanford Advisory Board FY2014 Work Plan Page 1 of 8 Topic Policy Level Issue HAB Action 1 Agency Priority for HAB Committee Assignment (lead in bold) Comments Site-Wide Tank Closure & Waste Management EIS * Protectiveness * Feasibility * Budget impacts * Schedule impacts * Review proposed/publicized RODs Potential Advice PIC, RAP, TWC River Corridor 618-11 Start in time to end in time Tracking (diligence) RAP 1 Advice, foundational understanding for subsequent year's priority work,

  19. AEO2015 Transportation Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Transportation Working Group Meeting Wednesday, July 30, 2014 2:00 - 3:00 p.m. Attendees in person: Austin Brown (NREL) Christopher Ramig (EPA) David Babson (EPA) Devi Mishra (EIA) John Maples (EIA) Lauren Rafelski (EPA) Mindi Farber-DeAnda (EIA) Nicholas Chase (EIA) Patricia Hutchins (EIA) Salil Deshpande (Energetics) Tom Stephens (ANL) Tom White (DOE) Attendees on the phone: Aaron Hula (EPA) Alicia Birky (TA Engineering) Chris Nevers (EPA) Chris Roof (Volpe) Christopher Grillo (IHS) Dallas

  20. Research Highlights Sorted by Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Aerosol Life Cycle | Cloud Life Cycle | Cloud-Aerosol-Precipitation Interactions | Aerosol | Cloud Modeling | Cloud Properties | Radiative Processes Aerosol Life Cycle 2016 Berg, L. Two-Column Aerosol Project: Impact of Elevated Particle Layers on Particle Optical Depth ASR Ching, J. Three Dimensions Are Better Than Two, When It Comes to Representing Aerosols ASR de Boer, G. An Update on Unmanned Platforms at Oliktok Point ARM ASR Fast, J. D. Impact of External Industrial Sources

  1. 2016 Used Fuel Disposition Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Used Fuel Disposition Working Group - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs

  2. TEC Working Group Background | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Background TEC Working Group Background Through the TEC/WG, DOE interacted with representatives of organizations at the state, tribal, and local levels to obtain input for program needs assessment, development and management, and to enhance their capability to carry out transportation emergency preparedness and safety activities specifically related to radioactive materials shipments. TEC membership included representatives from national, state, tribal and local government organizations, labor,

  3. DOE Hydrogen Pipeline Working Group Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline Working Group Workshop August 31, 2005 Augusta, Georgia Hydrogen Pipeline Experience Presented By: LeRoy H. Remp Lead Project Manager Pipeline Projects ppt00 3 Hydrogen Pipeline - Scope of Presentation Only those systems that are regulated by DOT in the US, DOT delegated state agency, or other federal regulatory authority. Cross property of third party and/or public properties for delivery to customers. Does not include in-plant or in-house hydrogen piping. Does not include piping

  4. Indian Country Energy and Infrastructure Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORKING GROUP ICEIWG APPROVED MEMBERS Blue Lake Rancheria  Jana Ganion, BLR Energy Director Confederated Tribes of the Warm Springs Reservation of Oregon  Chief Delvis Health  Jim Manion, General Manager, Warm Springs Power Ewiiaapaayp Band of Kumeyaay Indians  William Micklin, CEO Gila River Indian Community  Robert Stone, District 5 Community Councilman Ho-Chunk Nation  Representative Susan Waukon Mississippi Band of Choctaw Indians

  5. July 2012, Training Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business

  6. Cloud Properties Working Group Low Clouds Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cloud Properties Working Group Low Clouds Update Low Clouds Update Jennifer Comstock Jennifer Comstock Dave Turner Dave Turner Andy Andy Vogelmann Vogelmann Instruments Instruments 90/150 GHz microwave radiometer 90/150 GHz microwave radiometer Deployed during COPS AMF Deployed during COPS AMF Exploring calibration w/ DPR ( Exploring calibration w/ DPR ( Crewell Crewell & & L L ö ö hnert hnert ) ) See COPS Breakout, Wednesday evening See COPS Breakout, Wednesday evening 183 GHz (GVR)

  7. 2013 DOE Catalysis Working Group Meeting Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13 DOE Catalysis Working Group Meeting Agenda 2013 DOE Catalysis Working Group Meeting Agenda Agenda for the 2013 DOE Catalysis Working Group Meeting on May 15, 2013. cwg_may2013_agenda.pdf (89.11 KB) More Documents & Publications Catalysis Working Group Kick-Off Meeting Agenda DOE Durability Working Group June 2014 Meeting Agenda Catalysis Working Group Meeting: June 2015

  8. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  9. Microsoft Word - 03-14-08 CS Working Group news item v.2.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Sector Control Systems Working Group is a unique public-private partnership ... Protection Plan to support the private sector and government in collaborating on ...

  10. Cold moderator test facilities working group

    SciTech Connect (OSTI)

    Bauer, Guenter S.; Lucas, A. T.

    1997-09-01

    The working group meeting was chaired by Bauer and Lucas.Testing is a vital part of any cold source development project. This applies to specific physics concept verification, benchmarking in conjunction with computer modeling and engineering testing to confirm the functional viability of a proposed system. Irradiation testing of materials will always be needed to continuously extend a comprehensive and reliable information database. An ever increasing worldwide effort to enhance the performance of reactor and accelerator based neutron sources, coupled with the complexity and rising cost of building new generation facilities, gives a new dimension to cold source development and testing programs. A stronger focus is now being placed on the fine-tuning of cold source design to maximize its effectiveness in fully exploiting the facility. In this context, pulsed spallation neutron sources pose an extra challenge due to requirements regarding pulse width and shape which result from a large variety of different instrument concepts. The working group reviewed these requirements in terms of their consequences on the needs for testing equipment and compiled a list of existing and proposed facilities suitable to carry out the necessary development work.

  11. TEC Working Group Topic Groups Section 180(c) | Department of Energy

    Office of Environmental Management (EM)

    Section 180(c) TEC Working Group Topic Groups Section 180(c) Section 180(c) is a provision in the Nuclear Waste Policy Act that requires DOE to implement a program of technical and financial assistance to states for training public safety officials of appropriate units of local government and to Indian tribes through whose jurisdictions the Department plans to transport spent nuclear fuel or high-level waste to a facility authorized under the Nuclear Waste Policy Act. The training would cover

  12. Microsoft Word - Final FY14 WM Committee Work Plan 093013

    Office of Environmental Management (EM)

    4 Work Plan Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) WASTE MANAGEMENT COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT The Northern...

  13. Kenya-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Kenya-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  14. India-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name India-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  15. Brazil-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Brazil-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  16. Guyana-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Guyana-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  17. Mexico-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Mexico-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  18. Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    Malaysia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Malaysia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks,...

  19. Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Indonesia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  20. Egypt-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Egypt-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  1. Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    Ethiopia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Ethiopia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks,...

  2. ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks-Egypt-Low Carbon Growth Planning Support Redirect page Jump to: navigation, search REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:...

  3. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Work Planning and Control at the Nevada National Security Site - October 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Nevada National Security Site ...

  4. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Review, Work Planning and Control at the Hanford Tank Farms - April 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Hanford Tank Farms - April 2015...

  5. Enterprise Assessments Targeted Review of Work Planning and Control...

    Energy Savers [EERE]

    Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects - June 2015 Enterprise Assessments Targeted Review of Work Planning and...

  6. China-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name China-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  7. Working Group Reports Unmanned Aerospace Vehicle Workshop J. Vitko, Jr.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Reports Unmanned Aerospace Vehicle Workshop J. Vitko, Jr. Sandia National Laboratories Livermore, California The Unmanned Aerospace Vehicle (UAV) Workshop concentrated on reviewing and refining the science experiments planned for the UAV Demonstration Flights (UDF) scheduled at the Oklahoma Cloud and Radiation Testbed (CART) in April 1994. These experiments are summarized below. UDF Experiments 1. Clear sky, daylight Scientific questions: Do models and observations agree? Under

  8. Safety Monitor Joint Working Group (JWG) Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 th Meeting of the Joint Working Group of the U.S.-Japan Coordinating Committee of Fusion Energy on Safety in Inter-Institutional Collaborations (U.S.-Japan Safety Monitoring Program) Meeting in Japan, July 29-August 2, 2013 Submitted: October 16, 2013 Respectfully submitted to: Barry Sullivan Program Manager - ES&H U.S. DOE - Office of Fusion Energy Sciences Professor Kiyohiko Nishimura Head of Division for Health and Safety Management National Institute for Fusion Science Prepared by: Lee

  9. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  10. Technical WOrk Plan for: Construction Effects Monitoring

    SciTech Connect (OSTI)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  11. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC meeting topics WTP Communications Strategy o Debrief the TWC discussion from December o Identify PIC next steps as applicable including review of draft white paper if available Frame TPA Tutorial o Based on the tutorial given in November, discuss any additional framing questions/points to bring forward to the full Board in February Brainstorm Tutorial Topics o 100 D/H Proposed Plan Committee

  12. TEC Working Group Topic Groups Tribal Key Documents | Department of Energy

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Tribal Key Documents Key Documents Tribal Discussions on Grant Program (56.04 KB) Native American Map (731.69 KB) Task Plan 1 - Tribal Topic Group (Rev. 07-12-00) (12.26 KB) May 1, 2000 Department of Transportation, Federal Railroad Administration Memorandum (2.01 MB) NRC Advanced Notice of Proposed Rulemaking (25.63 KB) DOE Final Indian Policy (1.22 MB) Department of Transportation (DOT) Tribal Policy Order (32.94 KB) More Documents &

  13. 10 CFR 851 Implementation Work Group | Department of Energy

    Office of Environmental Management (EM)

    10 CFR 851 Implementation Work Group 10 CFR 851 Implementation Work Group The 10 C.F.R. 851 Work Group is established to promote excellence in the implementation of 10 C.F.R. 851, ...

  14. DOE Durability Working Group December 2014 Meeting Agenda | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy December 2014 Meeting Agenda DOE Durability Working Group December 2014 Meeting Agenda Agenda for the DOE Durability Working Group Meeting held December 16, 2014, in Lemont, Illinois. DOE Durability Working Group December 2014 Meeting Agenda (33.15 KB) More Documents & Publications DOE Durability Working Group May 2015 Meeting Agenda DOE Durability Working Group June 2014 Meeting Agenda DOE Durability Working Group May 2012

  15. DOE Durability Working Group February 2013 Meeting Agenda | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy February 2013 Meeting Agenda DOE Durability Working Group February 2013 Meeting Agenda Meeting agenda from the February 2013 Durability Working Group Meeting sponsored by the U.S. Department of Energy (DOE) Fuel Cell Technologies Office. durability_working_group_agenda_feb_2013.pdf (15.04 KB) More Documents & Publications DOE Durability Working Group May 2012 Meeting Agenda DOE Durability Working Group December 2014 Meeting Agenda DOE Durability Working Group May 2011

  16. DOE Durability Working Group October 2012 Meeting Agenda | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 Meeting Agenda DOE Durability Working Group October 2012 Meeting Agenda Meeting agenda from the Fall 2012 Durability Working Group Meeting sponsored by the U.S. Department of Energy (DOE) Fuel Cell Technologies Program. durability_working_group_agenda_oct_2012.pdf (16.28 KB) More Documents & Publications DOE Durability Working Group October 2010 Meeting Minutes DOE Durability Working Group May 2012 Meeting Agenda DOE Durability Working Group February 2013

  17. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  18. Work Group Leadership Meetings: Transition Elements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Leadership Meetings: Transition Elements Work Group Leadership Meetings: Transition Elements Meeting Dates: November 13 - 15, 2012 This Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized

  19. HSEP Committee FY 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2016 Work Plan Updated 12/10/2015 during the committee meeting Beryllium program update  Placeholder Annual Employee Concerns Program  Placeholder  Hear from new program director at WRPS  Quarter 1 (Oct-Dec) Quarter 2 (Jan-Mar) Quarter 3 (Apr-Jun) Quarter 4 (July-Sept) Holding Bin Transportation Effects on Worker Safety - draft advice  Review of draft advice Safety culture improvement efforts (joint with TWC)  Discuss Sounding Board for upcoming Board meeting o Review

  20. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/8/15 Facilitator notes in blue January Committee meeting placeholder: Tuesday, Jan. 12 Call placeholder: Tuesday, Jan. 19, 1:30 p.m. February Committee meeting placeholder: Tuesday, Feb. 9 Call placeholder: Tuesday, Feb. 16, 1:30 p.m. March Committee meeting placeholder: Tuesday, Mar. 5 Call placeholder: Tuesday, Mar. 22, 1:30 p.m.  100 D/H advice discussion  618-10 VPU update  PW-1/3/6 Work Plan (discuss EPA comments) o Will need DOE's responses to comments + general introduction o

  1. Transuranic Waste Transportation Working Group Agenda | Department of

    Office of Environmental Management (EM)

    Energy Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda Transuranic Waste Transportation Working Group Agenda (75.59 KB) More Documents & Publications Northeast High-Level Radioactive Waste Transportation Task Force Agenda TEC Working Group Topic Groups Archives Protocols Meeting Summaries TEC Meeting Summaries - September 2004

  2. IPGT Reservoir Modeling Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IPGT Reservoir Modeling Working Group IPGT Reservoir Modeling Working Group Summary of recommendations and geothermal reservoir benchmarking workshop gtp2012peerreviewreservoirm...

  3. Enel North America Utah Geothermal Working Group Meeting | Open...

    Open Energy Info (EERE)

    America Utah Geothermal Working Group Meeting Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Enel North America Utah Geothermal Working Group Meeting...

  4. Hydrgoen Storage Systems Analysis Working Group Meeting Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Summary report from the May 17, 2007...

  5. High Temperature Membrane Working Group Meeting (HTWGM) Agenda...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting (HTWGM) Agenda High Temperature Membrane Working Group Meeting (HTWGM) Agenda Preliminary agenda for the October 10 meeting of the High Temperature Membrane Working Group ...

  6. High Temperature Membrane Working Group, Minutes of Meeting on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Temperature Membrane Working Group, Minutes of Meeting on September 14, 2006 These meeting minutes provide information about the High Temperature Membrane Working Group ...

  7. Agenda of the High Temperature Membrane Working Group Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda of the High Temperature Membrane Working Group Meeting, Monday, June 9, 2008 Agenda of the High Temperature Membrane Working Group Meeting, Monday, June 9, 2008 HTMWG ...

  8. High Temperature Membrane Working Group Meeting, May 14, 2007...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting, May 14, 2007 High Temperature Membrane Working Group Meeting, May 14, 2007 This agenda provides information about the High Temperature Membrane Working Group Meeting on ...

  9. Blackout 2003: Electric System Working Group Technical Conference...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations December 16, 2003 Electric System Working Group Technical Conference, Philadelphia ...

  10. ITP Aluminum: Technical Working Group on Inert Anode Technologies...

    Energy Savers [EERE]

    ITP Aluminum: Technical Working Group on Inert Anode Technologies ITP Aluminum: Technical Working Group on Inert Anode Technologies inertech.pdf (8.16 MB) More Documents & ...

  11. Federal Utility Partnership Working Group (FUPWG) Seminar (Cinncinati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group (FUPWG) Seminar (Cinncinati, OH) Federal Utility Partnership Working Group (FUPWG) Seminar (Cinncinati, OH) May 18, 2016 9:00AM EDT to May ...

  12. Hadron colliders working group report (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Hadron colliders working group report Citation Details In-Document Search Title: Hadron colliders working group report Authors: Peggs, Stephen G. ; Syphers, M.J. Publication Date: ...

  13. North American Energy Work Group Releases Updated Trilateral...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Group Releases Updated Trilateral Energy Report North American Energy Work Group ... Bodman today released a report entitled North America - The Energy Picture II, which ...

  14. Workforce Retention Work Group Status Overview - September 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy September 2012 Workforce Retention Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (103.95 KB) More Documents & Publications Workforce Retention Work Group Status Overview - July 2012 Work Force Retention Work Group Charter Work Group Telecon (Final Charters)

  15. THE HIGGS WORKING GROUP: SUMMARY REPORT.

    SciTech Connect (OSTI)

    DAWSON, S.; ET AL.

    2005-08-01

    This working group has investigated Higgs boson searches at the Tevatron and the LHC. Once Higgs bosons are found their properties have to be determined. The prospects of Higgs coupling measurements at the LHC and a high-energy linear e{sup +}e{sup -} collider are discussed in detail within the Standard Model and its minimal supersymmetric extension (MSSM). Recent improvements in the theoretical knowledge of the signal and background processes are presented and taken into account. The residual uncertainties are analyzed in detail. Theoretical progress is discussed in particular for the gluon-fusion processes gg {yields} H(+j), Higgs-bremsstrahlung off bottom quarks and the weak vector-boson-fusion (VBF) processes. Following the list of open questions of the last Les Houches workshop in 2001 several background processes have been calculated at next-to-leading order, resulting in a significant reduction of the theoretical uncertainties. Further improvements have been achieved for the Higgs sectors of the MSSM and NMSSM. This report summarizes our work performed before and after the workshop in Les Houches. Part A describes the theoretical developments for signal and background processes. Part B presents recent progress in Higgs boson searches at the Tevatron collider. Part C addresses the determination of Higgs boson couplings, part D the measurement of tan {beta} and part E Higgs boson searches in the VBF processes at the LHC. Part F summarizes Higgs searches in supersymmetric Higgs decays, part G photonic Higgs decays in Higgs-strahlung processes at the LHC, while part H concentrates on MSSM Higgs bosons in the intense-coupling regime at the LHC. Part I presents progress in charged Higgs studies and part J the Higgs discovery potential in the NMSSM at the LHC. The last part K describes Higgs coupling measurements at a 1 TeV linear e{sup +}e{sup -} collider.

  16. TAP Report - Southwest Idaho Juniper Working Group

    SciTech Connect (OSTI)

    Gresham, Garold Linn

    2015-09-01

    There is explicit need for characterization of the materials for possible commercialization as little characterization data exists. Pinyon-juniper woodlands are a major ecosystem type found in the Southwest and the Intermountain West regions of the United States including Nevada, Idaho and Oregon. These widespread ecosystems are characterized by the presence of several different species of pinyon and juniper as the dominant plant cover. Since the 1800s, pinyon-juniper woodlands have rapidly expanded their range at the expense of existing ecosystems. Additionally, existing woodlands have become denser, progressively creating potential fire hazards as seen in the Soda Fire, which burned more than 400 sq. miles. Land managers responsible for these areas often desire to reduce pinyon-juniper coverage on their lands for a variety of reasons, as stated in the Working Group objectives. However, the cost of clearing thinning pinyon-juniper stands can be prohibitive. One reason for this is the lack of utilization options for the resulting biomass that could help recover some of the cost of pinyon-juniper stand management. The goal of this TAP effort was to assess the feedstock characteristics of biomass from a juniper harvested from Owyhee County to evaluate possible fuel and conversion utilization options.

  17. Interagency Working Groups | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    INTERFUEL implements provisions of the Clean Air Act Amendments and planning for the Energy Policy Act of 1992. Explore the About FEMP Pages FEMP Director: Dr. Timothy Unruh FEMP ...

  18. AEO2015 Coal Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Form EIA-860 indicate only 584 megawatts (MW) of planned coal-fired capacity additions (the 522-MW Kemper County IGCC plant in MS and the 62-MW Spiritwood plant in ND), and 28 ...

  19. Integration of Safety Culture Attributes into EFCOG Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG ... Topics Covered: Integration of Safety Culture (SC) Attributes into EFCOG Work Planning and ...

  20. September 13, 2012, HSS Focus Group Training Work Group - Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Senior Executive Safety Conscious Work Environment course which was developed to address ... Workers also expressed that educational material should clearly reinforce that ...

  1. Workforce Retention Work Group Status Overview - July 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy July 2012 Workforce Retention Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (86.1 KB) More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Strategic Initiatives Work Group Status Overview - July 2012 10 CFR 851 Work Group Status Overview - July 2012

  2. Federal Utility Partnership Working Group Seminar: Washington Update

    Broader source: Energy.gov [DOE]

    Presentation covers the Federal Utility Partnership Working Group Seminar: Washington Update on May 22, 2013.

  3. Strategic Initiatives Work Group Status Overview - July 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy July 2012 Strategic Initiatives Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (83.65 KB) More Documents & Publications Strategic Initiatives Work Group Status Overview - September 2012 10 CFR 851 Work Group Status Overview - July 2012 Workforce Retention Work Group Status Overview - July 2012

  4. Chemical Safety Vulnerability Working Group report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains the Executive summary; Introduction; Summary of vulnerabilities; Management systems weaknesses; Commendable practices; Summary of management response plan; Conclusions; and a Glossary of chemical terms.

  5. Fact Sheet: Bioenergy Working Group | Department of Energy

    Office of Environmental Management (EM)

    Bioenergy Working Group Fact Sheet: Bioenergy Working Group A fact sheet detailling the group launched at the Clean Energy Ministerial in Washington, D.C. on July 19th and 20th, ...

  6. Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (BILIWG), Hydrogen Separation and Purification Working Group (PURIWG) & Hydrogen Production Technical Team | Department of Energy Working Group (BILIWG), Hydrogen Separation and Purification Working Group (PURIWG) & Hydrogen Production Technical Team Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG), Hydrogen Separation and Purification Working Group (PURIWG) & Hydrogen Production Technical Team 2007 Annual and Merit Review Reports compiled for the

  7. Agenda for the High Temperature Membrane Working Group Meeting | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Agenda for the High Temperature Membrane Working Group Meeting Agenda for the High Temperature Membrane Working Group Meeting This agenda provides information about the Agenda for the High Temperature Membrane Working Group Meeting on September 14, 2006. htmwg_sept06_agenda.pdf (48.31 KB) More Documents & Publications Discussion Overview High Temperature Membrane Working Group, Minutes of Meeting on September 14, 2006 High Temperature Membrane Working Group Meeting, May 14,

  8. Agenda: High Temperature Membrane Working Group Meeting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Agenda: High Temperature Membrane Working Group Meeting Agenda: High Temperature Membrane Working Group Meeting Agenda for the High Temperature Membrane Working Group (HTMWG) meeting on May 18, 2009, in Arlington, Virginia htmwg_may09_agenda.pdf (64 KB) More Documents & Publications HTMWG, May 18, 2009, Welcome! High Temperature Membrane Working Group Meeting, May 14, 2007 Agenda of the High Temperature Membrane Working Group Meeting, Monday, June 9, 2008

  9. Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Summary report from the May 17, 2007 Hydrogen Storage Systems Analysis Working Group Meeting ssawg_may_summary.pdf (167.2 KB) More Documents & Publications Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006 Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report Hydrogen Storage Systems

  10. DOE Durability Working Group June 2014 Meeting Agenda | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy June 2014 Meeting Agenda DOE Durability Working Group June 2014 Meeting Agenda Agenda for the DOE Durability Working Group Meeting held June 16, 2014, in Washington, D.C., in conjunction with the DOE Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting. Durability Working Group June 2014 Meeting Agenda (28.67 KB) More Documents & Publications DOE Durability Working Group December 2014 Meeting Agenda DOE Durability Working Group May 2015 Meeting Agend

  11. DOE Durability Working Group October 2010 Meeting Minutes | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 0 Meeting Minutes DOE Durability Working Group October 2010 Meeting Minutes Minutes of DOE-EERE Durability Working Group Meeting, October 10, 2010, sponsored by the DOE Fuel Cell Technologies Program. durability_working_group_minutes_oct_2010.pdf (35.11 KB) More Documents & Publications DOE Durability Working Group May 2011 Meeting Agenda DOE Durability Working Group October 2011 Meeting Notes Durability Improvements Through Degradation Mechanism Studies

  12. High Temperature Membrane Working Group Meeting, May 14, 2007 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Meeting, May 14, 2007 High Temperature Membrane Working Group Meeting, May 14, 2007 This agenda provides information about the High Temperature Membrane Working Group Meeting on May 14, 2007 in Arlington, Va. htmwg07_agenda.pdf (79.9 KB) More Documents & Publications High Temperature Membrane Working Group High Temperature Membrane Working Group Minutes Agenda: High Temperature Membrane Working Group Meeting

  13. Macro-Industrial Working Group 2

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Group Macroeconomic Analysis Team: Kay Smith, Team Leader, Elizabeth Sendich, Russ ... Kay Smith kay.smith@eia.gov Elizabeth Sendich elizabeth.sendich@eia.gov (202) 586-8800 ...

  14. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Management Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order PDF icon WM-FY12-WP...

  15. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent Order TA-49 Remediation TA-21 Remediation Material Disposal Areas WM-FY14-WP - September 25, ...

  16. Waste Management Committee Fiscal Year 2013 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Work Plan Waste Management Committee Fiscal Year 2013 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles TA-49 Fiscal Year 2012 Budget WM-FY13-WP - September 26, 2012 (13.32

  17. Waste Management Committee Fiscal Year 2015 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY15-WP - November 17, 2014 (255.83

  18. Federal Utility Partnership Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    leadership to the country. Dr. Unruh feels that UESCs are hidden gems and have a lot more value than given credit for. FEMP is working on ways provide institutions with a better...

  19. Headquarters Facilities Work Planning and Control Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program (1.88 MB) More Documents & Publications AUDIT REPORT: OAS-L-04-07 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 Independent Oversight Review, DOE Headquarters Facilities - March 2002

  20. International scoping study: accelerator working group report

    SciTech Connect (OSTI)

    Zisman, Michael; Zisman, M.S.

    2006-09-30

    During the past several years, an International Scoping Study (ISS) of a Neutrino Factory was carried out, with the aim of developing an internationally accepted baseline facility design. Progress toward that goal will be described. Many of the key technical aspects of a Neutrino Factory facility design are presently being investigated experimentally, and the status of these investigations will be mentioned. Plans for the recently launched International Design Study (IDS), which serves as a follow-on to the ISS, will be briefly described.

  1. September 8, 2011, HSS/Union Focus Group Work Group Telecom ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AGENDA Work Group Framework 3:00 - 4:00 pm EST Introductory Remarks......Training Work Group 4:00 - 5:00 pm EST Introductory Remarks......

  2. 2014 Quality Work Plan (QWP) Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14 Quality Work Plan (QWP) Update 2014 Quality Work Plan (QWP) Update This update was given at the 2014 ACI National Home Performance Conference & Trade Show in Detroit, Michigan by Josh Olsen of the U.S. Department of Energy. 2014 Quality Work Plan (QWP) Update Presentation (2.11 MB) More Documents & Publications How to align field guides and standards to the Standard Work Specifications WPN 14-4: Quality Work Plan Requirement WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE

  3. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT RCC Workplan PDF EN FR.PDF (67.81 KB) More Documents & Publications REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards, July 2016 REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards REGULATORY PARTNERSHIP STATEMENT

  4. Preliminary Agenda: October 2008 High Temperature Membrane Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting | Department of Energy Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting Agenda for October 2008 High Temperature Membrane Working Group Meeting in Honolulu, Hawaii. htmwg_agenda_meeting_1008.pdf (27.08 KB) More Documents & Publications Minutes of the October 2008 Meeting of the High Temperature Membrane Working Group Agenda for the High Temperature Membrane Working

  5. DOE Durability Working Group October 2011 Meeting Notes | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 Meeting Notes DOE Durability Working Group October 2011 Meeting Notes Meeting notes from the Fall 2011 Durability Working Group (DWG) Meeting sponsored by the U.S. Department of Energy (DOE) Fuel Cell Technologies Program. Notes also include a summary of progress on action items from the Spring 2011 DWG meeting. durability_working_group_minutes_oct_2011.pdf (54.58 KB) More Documents & Publications DOE Durability Working Group October 2010 Meeting Minutes DOE Durability Working

  6. Indian Country Energy and Infrastructure Working Group | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Indian Country Energy and Infrastructure Working Group Indian Country Energy and Infrastructure Working Group The Indian Country Energy and Infrastructure Working Group (ICEIWG) works collaboratively with the U.S. Department of Energy (DOE) Office of Indian Energy to assist in surveys, analysis, and recommendations related to program and policy initiatives that fulfill DOE's statutory authorizations and requirements. About ICEIWG ICEIWG_Jan2016.jpg The working group was established in

  7. TEC Working Group Topic Groups Manual Review Key Documents | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Manual Review Key Documents TEC Working Group Topic Groups Manual Review Key Documents Key Documents Transportation Practices Manual (DOE M 460) - March 8, 2006 (438.51 KB) More Documents & Publications DOE Shipment Activities: What We Accomplished and a Look Forward TEC Working Group Topic Groups Section 180(c) Key Documents TEC Working Group Topic Groups Rail Key Documents

  8. State & Tribal Government Working Group (STGWG)

    Broader source: Energy.gov [DOE]

    Established in the early 1990s, STGWG is composed of policy-level representatives from states and tribes that host DOE facilities or are otherwise impacted by activities at DOE facilities. STGWG helps ensure that DOE facilities and sites are operated and cleaned up in compliance with all applicable federal and state laws and regulations, and Tribal rights including those retained by treaty, and conferred by statute and the trust responsibility; as well as in a manner that protects human health, safety and the environment. Managed by the National Conference of State Legislatures, STGWG's composition offers a unique perspective on issues such as long-term stewardship, tribal issues, transportation planning, nuclear waste and materials disposition, and deactivation and decommissioning activities.

  9. Solar Working Group Releases Standard Contracts - News Releases...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Standard Contracts NREL-organized group aims to improve access to low-cost capital November 5, 2013 A working group representing solar industry stakeholders has developed standard ...

  10. Category:Wind Working Group Toolkit | Open Energy Information

    Open Energy Info (EERE)

    search This wiki-based Wind Working Group Toolkit provides links to information, methods, and resources. This wiki is a work in progress, and we welcome your contributions....

  11. NUFACT02 MACHINE WORKING GROUP SUMMARY.

    SciTech Connect (OSTI)

    AUTIN,B.FERNOW,R.C.MACHIDA,S.HARRIS,D.A.

    2002-07-01

    At {nu}Fact'02, the muon-based neutrino factory was confronted with existing and planned neutrino facilities. When it was first discussed in 1999 in Lyon [1], it raised great enthusiasm, especially because it was thought to be the only machine capable of measuring CP violation in the leptonic sector. Since that time the pendulum has partially swung back. Two successive detailed studies [2, 3] have shown that a neutrino Factory and the needed R&D were both expensive. In terms of present experiments, neutrino oscillations have been confirmed at SuperK and SNO and results are soon expected from KamLAND. K2K, MniBOONE, MINOS and CNGS are going ahead and new perspectives have been opened by off-axis pion-based neutrino beams and the approval of the high intensity Japanese Hadron Facility. Crests and troughs of a wave are common in long term projects. They are even healthy because they force us to scrutinize the first ideas and sometimes to invent new ones to reach a realistic and affordable design. This analysis has been applied to target systems (section 2), RF capture and cooling of the muons (section 4) and accelerators (section 5). The new concept of pure electron neutrino or anti-neutrino beams produced by, {beta}-decay is discussed in section 3.

  12. Work Group Telecon (Final Charters) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telecon (Final Charters) Work Group Telecon (Final Charters) Meeting Date: April 24, 2012 Documents Available for Download Meeting Agenda (36.94 KB) More Documents & Publications Work Group Telecom (Draft Charters

  13. Training Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (86.72 KB) More Documents & Publications Training Work Group Status Overview - September

  14. Training Work Group Status Overview - September 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2012 Training Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (115.87 KB) More Documents & Publications Training Work Group Status Overview - July

  15. Working Group Report on - Space Nuclear Power Systems and Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D "Even ...

  16. Minutes of the High Temperature Membrane Working Group Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minutes of the High Temperature Membrane Working Group Meeting, Monday, May 18, 2009 Summary of the meeting on Monday, May 18, 2009, for the High Temperature Membrane Working Group ...

  17. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24, 3:00 p.m. Swim lanes WTP Communication Plan update( following joint topic w PIC @ their April meeting) Cesium IM update Leadership Retreat Preparation + EM...

  18. Utilities Working with Industry: Action Plan

    SciTech Connect (OSTI)

    none,

    2010-06-25

    This action plan outlines joint ITP and utility activities that will help reach a national goal of reducing energy by 25 percent over then next 10 years.

  19. AEO2015 Liquid Fuels Markets Working Group Presentation

    U.S. Energy Information Administration (EIA) Indexed Site

    Assumptions for Annual Energy Outlook 2015: Liquid Fuels Markets Working Group AEO2015 Liquid Fuels Markets Working Group Meeting Office of Petroleum, Natural Gas & Biofuels Analysis July 17, 2014 | Washington, DC WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Discussion topics Office of Petroleum, Natural Gas, & Biofuels Analysis Working Group Presentation for Discussion Purposes Washington DC, July 17, 2014 DO NOT QUOTE OR CITE

  20. BILIWG Meeting: DOE Hydrogen Quality Working Group Update and Recent

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress (Presentation) | Department of Energy DOE Hydrogen Quality Working Group Update and Recent Progress (Presentation) BILIWG Meeting: DOE Hydrogen Quality Working Group Update and Recent Progress (Presentation) Presented at the 2007 Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group held November 6, 2007 in Laurel, Maryland. 12_anl_h2_quality_working_group_update.pdf (683.47 KB) More Documents & Publications Effects of Fuel and Air Impurities on PEM Fuel Cell

  1. Federal Utility Partnership Working Group: Welcome to Portland

    Broader source: Energy.gov [DOE]

    Presentation covers welcoming attendees to Portland at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  2. Federal Utility Partnership Working Group Meeting: Washington Update

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy; DOE; Federal Energy Management Program; FEMP; Federal Utility Partnership Working Group; FUPWG; Spring 2012

  3. Annual Energy Outlook 2016 Renewables Working Group Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewables Working Group Preliminary Results Renewables AEO2016 Working Group February 9, 2016| Washington, DC By EIA, Renewable Electricity Analysis Team WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview 2 Renewable Electricity Analysis Team February 9, 2016 * Key policy provisions * Update on CPP model representation * Update on status of Leidos capital cost study * Preliminary results WORKING GROUP PRESENTATION FOR DISCUSSION

  4. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The objective of these biannual Working Group meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes. ssawg_summary_report.pdf (266.68 KB) More Documents & Publications Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006

  5. Federal Utility Partnership Working Group Meeting Chairman's Corner |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Meeting Chairman's Corner Federal Utility Partnership Working Group Meeting Chairman's Corner Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting-lists key utility program projects and upcoming utility energy service contract (UESC) training. Download the Federal Utility Partnership Working Group Meeting Chairman's Corner presentation. (134.21 KB) More Documents & Publications Federal Utility Partnership Working Group

  6. Federal Utility Partnership Working Group Seminar: Chairman's Corner |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility Partnership Working Group Seminar: Chairman's Corner from May 22, 2013. fupwg_spring13_mcandrew.pdf (309.16 KB) More Documents & Publications Federal Utility Partnership Working Group Meeting Chairman's Corner Federal Utility Partnership Working Group Meeting: Chairman's Corner FUPWG Spring 2013 Report and Presentations

  7. Federal Utility Partnership Working Group Purpose, Policies, and Operations

    Broader source: Energy.gov [DOE]

    Draft document (last updated in 2010) discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group.

  8. 2005 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 5 High Temperature Membrane Working Group Meeting Archives 2005 High Temperature Membrane Working Group Meeting Archives View 2005 meeting presentations from the High Temperature Membrane Working Group. October 20, 2005, Los Angeles, California Conductivity Testing in High Temperature Membranes, Jim Boncella, Los Alamos National Laboratory Photo of participants at the High Temperature Membrane Working Group Meeting in October 2005 May 26, 2005, Arlington, Virginia Agenda Model

  9. 2007 Hydrogen Pipeline Working Group Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Hydrogen Pipeline Working Group Workshop 2007 Hydrogen Pipeline Working Group Workshop The Department of Energy (DOE) Hydrogen Pipeline Working Group met Sept. 25-26, 2007, to review the progress and results of DOE-sponsored pipeline research and development (R&D) projects. More than 30 researchers and industry representatives shared their research results and discussed the current challenges and future goals for hydrogen pipeline R&D. One of the Pipeline Working Group's near-term

  10. BEDES Strategic Working Group Recommendations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BEDES Strategic Working Group Recommendations BEDES Strategic Working Group Recommendations The BEDES Strategic Working Group Recommendations document is a guide to how the BEDES Dictionary can be brought to market and provide the services for which it was designed. BEDES Strategic Working Group Recommendations (351.06 KB) More Documents & Publications BEDES_Webinar_11-13 BuildingSync and SEED Development and Deployment Building Energy Data Exchange Specification Scoping Report

  11. High Temperature Membrane Working Group Meeting (HTWGM) Agenda | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Meeting (HTWGM) Agenda High Temperature Membrane Working Group Meeting (HTWGM) Agenda Preliminary agenda for the October 10 meeting of the High Temperature Membrane Working Group htwmg_oct07_agenda.pdf (11.24 KB) More Documents & Publications Strategy for Aging Tests of Fuel Cell Membranes (Presentation) Agenda of the High Temperature Membrane Working Group Meeting, Monday, June 9, 2008 Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting

  12. LED Parking Lot Lighting Working Group Fact Sheet

    SciTech Connect (OSTI)

    2008-10-01

    This fact sheet describes the Retailer Energy Alliance LED Parking Lot Lighting Working Group and its Technology Procurement Project.

  13. Blackout 2003: Electric System Working Group Technical Conference -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments and Recommendations | Department of Energy Electric System Working Group Technical Conference - Comments and Recommendations Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations December 16, 2003 Electric System Working Group Technical Conference, Philadelphia PA - Summary of comments and recommendations relating to the aftermath of the August 2003 blackout. Recommendations (120.51 KB) More Documents & Publications Blackout 2003:

  14. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Summary of June 11, 2008, biannual meeting of the Hydrogen Storage Systems Analysis Working Group. ssawg_summary_report_0608.pdf (52.38 KB) More Documents & Publications Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Technical Assessment of Organic Liquid Carrier Hydrogen Storage Systems for Automotive Applications Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report

  15. DOE Hydrogen Pipeline Working Group Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline Working Group Workshop DOE Hydrogen Pipeline Working Group Workshop Only those systems that are regulated by DOT in the US, DOT delegated state agency, or other federal regulatory authority hpwgw_airprod_remp.pdf (473.83 KB) More Documents & Publications Hydrogen Piping Experience in Chevron Refining Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines EIS-0511: Final Environmental Impact Statement

  16. High Temperature Membrane Working Group Minutes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting minutes from the May 14, 2007 meeting of the High Temperature Membrane Working Group. htmwg_minutes_may07.pdf (309.75 KB) More Documents & Publications High Temperature Membrane Working Group Meeting, May 14, 2007 In Plane Conductivity Testing, BekkTech LLC High Temperature Membrane Working Group

  17. High Temperature Membrane Working Group Minutes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minutes from the High Temperature Membrane Working Group May 19, 2006 meeting. htwg_minutes_051906.pdf (14.47 KB) More Documents & Publications Discussion Overview High Temperature Membrane Working Group, Minutes of Meeting on September 14, 2006 Minutes of the High Temperature Membrane Working Group Meeting, Monday, May 18, 2009

  18. International Technical Working Group Round Robin Tests

    SciTech Connect (OSTI)

    Dudder, Gordon B.; Hanlen, Richard C.; Herbillion, Georges M.

    2003-02-01

    The goal of nuclear forensics is to develop a preferred approach to support illicit trafficking investigations. This approach must be widely understood and accepted as credible. The principal objectives of the Round Robin Tests are to prioritize forensic techniques and methods, evaluate attribution capabilities, and examine the utility of database. The HEU (Highly Enriched Uranium) Round Robin, and previous Plutonium Round Robin, have made tremendous contributions to fulfilling these goals through a collaborative learning experience that resulted from the outstanding efforts of the nine participating internal laboratories. A prioritized list of techniques and methods has been developed based on this exercise. Current work is focused on the extent to which the techniques and methods can be generalized. The HEU Round Robin demonstrated a rather high level of capability to determine the important characteristics of the materials and processes using analytical methods. When this capability is combined with the appropriate knowledge/database, it results in a significant capability to attribute the source of the materials to a specific process or facility. A number of shortfalls were also identified in the current capabilities including procedures for non-nuclear forensics and the lack of a comprehensive network of data/knowledge bases. The results of the Round Robin will be used to develop guidelines or a ''recommended protocol'' to be made available to the interested authorities and countries to use in real cases.

  19. Working Group Report: Computing for the Intensity Frontier

    SciTech Connect (OSTI)

    Rebel, B.; Sanchez, M.C.; Wolbers, S.

    2013-10-25

    This is the report of the Computing Frontier working group on Lattice Field Theory prepared for the proceedings of the 2013 Community Summer Study ("Snowmass"). We present the future computing needs and plans of the U.S. lattice gauge theory community and argue that continued support of the U.S. (and worldwide) lattice-QCD effort is essential to fully capitalize on the enormous investment in the high-energy physics experimental program. We first summarize the dramatic progress of numerical lattice-QCD simulations in the past decade, with some emphasis on calculations carried out under the auspices of the U.S. Lattice-QCD Collaboration, and describe a broad program of lattice-QCD calculations that will be relevant for future experiments at the intensity and energy frontiers. We then present details of the computational hardware and software resources needed to undertake these calculations.

  20. 10 CFR 851 Implementation Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation Work Group Charter 10 CFR 851 Implementation Work Group Charter The 10 C.F.R. 851 Work Group is intended to promote excellence in the implementation of 10 C.F.R. 851, "Worker Safety and Health" and continuous improvement in the implementation of health and safety programs for the DOE contractor work force. The Work Group provides a collaborative opportunity for DOE to gain insights from the contractor work force and their representatives, and identify and communicate

  1. 10 CFR 851 Implementation Work Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 CFR 851 Implementation Work Group 10 CFR 851 Implementation Work Group The 10 C.F.R. 851 Work Group is established to promote excellence in the implementation of 10 C.F.R. 851, "Worker Safety and Health" and continuous improvement in the implementation of health and safety programs for the DOE contractor work force. The Work Group provides a collaborative opportunity for DOE to gain insights from the contractor work force and their representatives, and identify and communicate best

  2. Memorandum, NNSA Activity Level Work Planning & Control Processes, January 2006

    Broader source: Energy.gov [DOE]

    January 23, 2006 Memorandum from Thomas P. D’Agostino, Assistant Deputy Administrator for Program Integration, Action: Revitalizing Integrated Safety Management; Site Office Action Plans for Improving Activity Level Work Planning and Control Processes.

  3. Chemical Safety Vulnerability Working Group report. Volume 3

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 3 consists of eleven appendices containing the following: Field verification reports for Idaho National Engineering Lab., Rocky Flats Plant, Brookhaven National Lab., Los Alamos National Lab., and Sandia National Laboratories (NM); Mini-visits to small DOE sites; Working Group meeting, June 7--8, 1994; Commendable practices; Related chemical safety initiatives at DOE; Regulatory framework and industry initiatives related to chemical safety; and Chemical inventory data from field self-evaluation reports.

  4. Work Group Telecom (Draft Charters) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telecom (Draft Charters) Work Group Telecom (Draft Charters) Meeting Date: September 8, 2011 Documents Available for Download Meeting Agenda (30.01 KB) Meeting Summary/Actions/Participants (72.36 KB) Draft Proposed Charter Template (52.16 KB) Draft Work Group Matrix (60.18 KB) Draft Work Group Guidance (47.24 KB) More Documents & Publications Focus Group Meeting (Activities Status

  5. Federal Utility Partnership Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Federal Utility Partnership Working Group The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among federal agencies, utilities, and energy service companies. FUPWG develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at federal sites. The mission and objectives of the Federal Utility Partnership Working Group are to: Enhance existing or foster new

  6. 2005 Hydrogen Pipeline Working Group Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Hydrogen Pipeline Working Group Workshop 2005 Hydrogen Pipeline Working Group Workshop DOE held a Hydrogen Pipeline Working Group Workshop August 30-31, 2005 in Augusta, Ga. The workshop provided the opportunity for researchers to hear from industry experts about their field experiences with current in-service hydrogen pipelines (both new construction and converted). The group also explored research or other activities needed to improve costs and operability. Issues addressed by industry

  7. Strategic Initiatives Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Charter Strategic Initiatives Work Group Charter Strategic Initiatives Work Group promote excellence and continuous improvement in the implementation of worker health and safety programs across the DOE complex. The Work Group provides a collaborative opportunity for DOE to gain insights from operating contractors, the contractor work force and their representatives, and to combine the best wisdom to assure that the most efficient and effective worker health and safety program expectations,

  8. TEC Working Group Topic Groups Archives Mechanics of Funding and Technical

    Office of Environmental Management (EM)

    Assistance | Department of Energy Mechanics of Funding and Technical Assistance TEC Working Group Topic Groups Archives Mechanics of Funding and Technical Assistance Mechanics of Funding and Technical Assistance Items Available for Download Funding Mechanisms Comparison Matrix (15.41 KB) More Documents & Publications TEC Working Group Topic Groups Section 180(c) Key Documents Implementation of Section 180(c) of the Nuclear Waste Policy Act TEC Working Group Topic Groups Tribal Conference

  9. Office of Enterprise Assessments Targeted Review of Work Planning and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control and Biological Safety at the Los Alamos National Laboratory - December 2015 | Department of Energy Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 December 2015 Review of Work Planning and Control and Biological Safety at the

  10. Enterprise Assessments Targeted Review, Work Planning and Control at the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site - October 2015 | Department of Energy Review, Work Planning and Control at the Nevada National Security Site - October 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Nevada National Security Site - October 2015 October 2015 Targeted Review of the Work Planning and Control at the Nevada National Security Site The U.S. Department of Energy (DOE) Office of Enterprise Assessments (EA) conducted an independent review of activity-level

  11. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development - 2016/17; April 12, 2016 | Department of Energy CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 Work Plan and Development 2016-04-12 (207.15 KB) More Documents & Publications Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards North America Energy

  12. Integration of Safety Culture Attributes into EFCOG Work Planning and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Guidance Document | Department of Energy Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document May 15, 2013 Presenters: Steele Coddington, NSTec, Las Vegas, and John McDonald, WRPS, Hanford Topics Covered: Integration of Safety Culture (SC) Attributes into EFCOG Work Planning and Control Guidance Document Linking SC to WP&C CRADS EFCOG and DOE SC and WP&C

  13. Chemical Safety Vulnerability Working Group report. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 2 consists of seven appendices containing the following: Tasking memorandums; Project plan for the CSV Review; Field verification guide for the CSV Review; Field verification report, Lawrence Livermore National Lab.; Field verification report, Oak Ridge Reservation; Field verification report, Savannah River Site; and the Field verification report, Hanford Site.

  14. Strategic Initiatives Work Group Status Overview - September 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy September 2012 Strategic Initiatives Work Group Status Overview - September 2012 Documents Available for Download September 2012 Status Overviews (121.47 KB) More Documents & Publications Strategic Initiatives Work Group Status Overview - July 2012 Focus Group Meeting (Activities Status) Active Labor Unions Interfacing with DOE - June 2014

  15. High Temperature Membrane Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group High Temperature Membrane Working Group This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007. htmwg_kopasz_intro.pdf (305.34 KB) More Documents & Publications HTMWG, May 18, 2009, Welcome! Universal Membrane Classification Scheme: Maximizing the Return on High Temperature PEM Membrane Research Membranes and MEAs for Dry, Hot Operating Conditions

  16. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 Office of Enterprise Assessments Targeted Review of Work Planning and Control and ...

  17. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific ... groundwater characterization elements during a tour of the Nevada National Security Site. ...

  18. DOE Handbook: Implementing Activity-level Work Planning & Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lessons Learned Linking Safety Culture and the Effectiveness of WP&C Practices ... Small Beginnings Integration of Safety Culture Attributes into EFCOG Work Planning and ...

  19. 1800 Engineered Safety Work Planning and Controls and HF Delivery...

    Office of Scientific and Technical Information (OSTI)

    Conference: 1800 Engineered Safety Work Planning and Controls and HF Delivery System. ... Country of Publication: United States Language: English Word Cloud More Like This Full ...

  20. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT...

  1. Enterprise Assessments Targeted Review of Work Planning and Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... of activity-level work planning and control (AL-WP&C) at ... programs, and nuclear emergency response capabilities. ... However, EA identified some problems with the specification ...

  2. Office of Enterprise Assessments Targeted Review of Work Planning...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy (DOE) Office of Enterprise Assessments (EA) conducted an independent review of activity-level work planning and control at the Hanford Tank Farms. The Tank Farms...

  3. May 21, 2012, Office of Health, Safety and Security (HSS) Focus Group Work Force Retention Work Group Charter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Charter In an ongoing effort to further the improvement of health, safety, environmental, and security performance within the Department, DOE is engaged in the establishment of work groups to pursue health and safety improvements across the DOE Complex. These efforts support DOE's responsibility as owner/manager to protect its greatest asset: the worker. The work groups support DOE's integrated safety management system and further DOE's best interests by fostering

  4. ISM Workshop on Work Planning and Controls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... ISM Champions Workshop 2013 14 play video Integrated Safety Management 15 ISM Champions ... Controls and Work Within Controls: * Feedback and Improvement: Ensure lessons ...

  5. HSEP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HSEMC Homeland Security and Emergency Management Coordination (HSEMC) Program The Office of Emergency Management assists the NNSA and Department of Energy sites in integrating Department of Homeland Security initiatives into the NNSA Emergency Management System (EMS). This program provides NNSA headquarters coverage for emerging presidential directives and assistance... Planning for Emergencies Emergency Management is the application of the necessary resources to mitigate consequences of an

  6. Proposed Work Scope for the Rail Topic Group

    Office of Environmental Management (EM)

    (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and ... or as necessary, reporting back to the full RTG on the bimonthly calls and at meetings. ...

  7. Technology Transfer Working Group (TTWG) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Transfer Working Group (TTWG) Technology Transfer Working Group (TTWG) With the passage of the Energy Policy Act of 2005, Title X, Sec. 1001, the Secretary of Energy was directed to establish a Technology Transfer Working Group (TTWG), to include representatives from DOE National Laboratories and single purpose research facilities. The same section of the Act also directs the Secretary to appoint a Technology Transfer Coordinator. The duties of the Technology Transfer Coordinator

  8. Interagency Committees and Working Groups | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Environment » Radiation Protection of the Public and the Environment » Interagency Committees and Working Groups Interagency Committees and Working Groups DOE is actively involved with other Federal agencies that have responsibilities for the radiation protection of the public and the environment. This site provides the different committees and working groups that DOE is involved with. Interagency Steering Committee on Radiation Standards (ISCORS): The ISCORS is comprised of 8

  9. Federal Utility Partnership Working Group Seminars | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Financing » Utility Energy Service Contracts » Federal Utility Partnership Working Group Seminars Federal Utility Partnership Working Group Seminars The Federal Utility Partnership Working Group (FUPWG) meets twice per year to share success stories, information on Federal Energy Management Program activities and other business. Upcoming Seminar Puget Sound Energy logo. FUPWG Fall 2016 November 2-3, 2016 Bellevue, Washington Hosted by Puget Sound Energy Recent Seminar FUPWG Spring 2016

  10. Environmental Justice Interagency Working Group releases "Promising

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices for EJ Methodologies in NEPA Reviews" | Department of Energy Environmental Justice Interagency Working Group releases "Promising Practices for EJ Methodologies in NEPA Reviews" Environmental Justice Interagency Working Group releases "Promising Practices for EJ Methodologies in NEPA Reviews" April 6, 2016 - 4:20pm Addthis The Environmental Justice (EJ) Interagency Working Group (IWG) Promising Practices report is a compilation of approaches that the NEPA

  11. High Temperature Membrane Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Temperature Membrane Working Group High Temperature Membrane Working Group The High Temperature Membrane Working Group consists of government, industry, and university researchers interested in developing high temperature membranes for fuel cells. Description Technical Targets Meetings Contacts Description Polymer electrolyte membrane (PEM) fuel cells typically operate at temperatures no higher than 60°C-80°C due to structural limitations of the membrane. Operating PEM fuel cell stacks at

  12. 2003 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy High Temperature Membrane Working Group Meeting Archives 2003 High Temperature Membrane Working Group Meeting Archives View 2003 meeting presentations from the High Temperature Membrane Working Group. October 17, 2003, Orlando, Florida High T Membrane Development at Foster-Miller, Bindu Nair, Foster-Miller Highly Sulfonated Polymers for High Temperature Applications, Morton Litt, Case Western Reserve University Assessing Transport in New Electrolytes, Bryan Pivovar, LANL

  13. 2004 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 4 High Temperature Membrane Working Group Meeting Archives 2004 High Temperature Membrane Working Group Meeting Archives View 2004 meeting presentations from the High Temperature Membrane Working Group. October 8, 2004, Honolulu, Hawaii High Temperature Fuel Cell Performance of Sulfonated Poly (phenylene) Proton Conducting Polymers, Chris J. Cornelius, Cy H. Fujimoto, Michael A. Hickner, Darin Leonhardt, Sandia National Laboratories Higher Temperature PEM Composite Systems for Fuel

  14. 2006 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 6 High Temperature Membrane Working Group Meeting Archives 2006 High Temperature Membrane Working Group Meeting Archives View 2006 meeting presentations from the High Temperature Membrane Working Group. September 14, 2006, San Francisco, California Agenda Minutes Discussion Overview, James Fenton, University of Central Florida Membrane Performance and Durability Overview for Automotive Fuel Cell Applications, Tom Greszler, GM Measuring Physical Properties of Polymer Electrolyte

  15. 2007 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 7 High Temperature Membrane Working Group Meeting Archives 2007 High Temperature Membrane Working Group Meeting Archives View 2007 meeting presentations from the High Temperature Membrane Working Group. October 10, 2007, Washington, D.C. This meeting was held in conjunction with the Electrochemical Society's fall meeting. Meeting Agenda Meeting Minutes Structure and Dynamics of Polymer Nanocomposites by Grazing-Incidence X-Ray Techniques, Jin Wang, Argonne National Laboratory

  16. 2009 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 9 High Temperature Membrane Working Group Meeting Archives 2009 High Temperature Membrane Working Group Meeting Archives View information from meetings of the High Temperature Membrane Working Group held in 2009. November 16, 2009, Palm Springs, California This meeting was held in conjunction with the Fuel Cell Seminar. Minutes U.S. Fuel Cell Council: The Voice of the Fuel Cell Industry Membrane Requirements for Back-up Power Applications, Michael Hicks, IdaTech GenSys Blue: Fuel

  17. 2010 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 10 High Temperature Membrane Working Group Meeting Archives 2010 High Temperature Membrane Working Group Meeting Archives View information from meetings of the High Temperature Membrane Working Group held in 2010. October 14, 2010, Las Vegas, Nevada Minutes Continuum Modeling of Membrane Properties, Ahmet Kusoglu and Adam Z. Weber, Lawrence Berkeley National Laboratory Some Durability Considerations for Proton Exchange Membranes, Steven Hamrock, 3M Fuel Cell Components Program

  18. Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group The Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG), launched in October 2006, provides a forum for effective communication and collaboration among participants in DOE Fuel Cell Technologies Office (FCT) cost-shared research directed at distributed bio-liquid reforming. The Working Group includes individuals from DOE, the national laboratories, industry, and academia.

  19. Minutes of the Fall 2009 High Temperature Membrane Working Group |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Fall 2009 High Temperature Membrane Working Group Minutes of the Fall 2009 High Temperature Membrane Working Group Minutes of the Fall 2009 High Temperature Membrane Working Group, November 16, 2009 htmwg_nov09_minutes.pdf (41.2 KB) More Documents & Publications GenSys Blue: Fuel Cell Heating Appliance 2009 Fuel Cell Market Report 2008 Fuel Cell Technologies Market Report

  20. Minutes of the High Temperature Membrane Working Group Meeting | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Meeting Minutes of the High Temperature Membrane Working Group Meeting High Temperature Membrane Working Group members meet October 10, 2007 in Washington, DC. minutes_of_htmwg_mtg.pdf (92.47 KB) More Documents & Publications High Temperature Membrane Working Group Meeting (HTWGM) Agenda Strategy for Aging Tests of Fuel Cell Membranes (Presentation) CARISMA: A Networking Project for High Temperature PEMFC MEA Activities in Europe

  1. High Temperature Membrane Working Group Meeting Minutes | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Meeting Minutes High Temperature Membrane Working Group Meeting Minutes Minutes of the High Temperature Membrane Working Group Meeting held Oct. 14, 2010, in Las Vegas, NV high_temp_oct_2010_meeting.pdf (71.86 KB) More Documents & Publications Some durability considerations for proton exchange membranes Agenda for the High Temperature Membrane Working Group Meeting Progress and Status on Through-Plane Resistance and Conductivity Measurement of Fuel Cell Membranes

  2. Catalysis Working Group Meeting: January 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2015 Catalysis Working Group Meeting: January 2015 The Catalysis Working Group held a meeting on January 21, 2015, in Los Alamos, New Mexico. Meeting Agenda and Presentations Catalysis Working Group January 2015 Meeting Agenda (22.89 KB) Electrocatalysts with Ultra-Low PGM Loadings-Vojislav Stamenkovic, Argonne National Laboratory (15.95 MB) Improving Stability and Activity of Pt Monolayer in Non-Pt Core-Shell Electrocatalysts-Radoslav Adzic, Brookhaven National Laboratory (3.33 MB)

  3. Catalysis Working Group Meeting: June 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Catalysis Working Group Meeting: June 2015 The Catalysis Working Group held a meeting on June 8, 2015, in Arlington, Virginia, in conjunction with the DOE Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting. Meeting Agenda and Presentations Catalysis Working Group June 2015 Meeting Agenda (97.68 KB) Non-PGM Catalyst Targets: Summary-Piotr Zelenay, Los Alamos National Laboratory (657.07 KB) Alternative Metal Oxide Supports for Cathode Catalyst Powder in Automotive

  4. Catalysis Working Group Meeting: May 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting: May 2013 Catalysis Working Group Meeting: May 2013 The Catalysis Working Group held a meeting on May 15, 2013, in Arlington, Virginia, in conjunction with the DOE Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting. Agenda Catalysis Working Group Meeting Agenda Presentations Electrocatalysts for Automotive Fuel Cells: Status and Challenges, Nilesh Dale, Nissan Technical Center North America Challenges for PEMFC Catalysts in Automotive Applications, Stephen

  5. Fact Sheet: Multilateral Solar and Wind Working Group | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar and Wind Working Group will focus its initial work on developing a Global Atlas for Solar and Wind Energy and a corresponding Long-Term Strategy on Joint Capacity ...

  6. Summary of the TeV33 working group

    SciTech Connect (OSTI)

    Bagley, P.P.; Bieniosek, F.M.; Colestock, P.

    1996-10-01

    This summary of the TeV33 working group at Snowmass reports on work in the areas of Tevatron store parameters, the beam-beam interaction, Main Injector intensity (slip stacking), antiproton production, and electron cooling.

  7. Working Group Reports Calibration of Radiation Codes Used in...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Reports Calibration of Radiation Codes Used in Climate Models: Comparison of Clear-Sky Calculations with Observations from the Spectral Radiation Experiment and the ...

  8. Records Management Working Group Charter | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The purpose of the Records Management Working Group (RMWG) is to provide guidance, direction, and coordination for the Department of Energy's (DOE) Records Management Program so...

  9. Federal Utility Partnership Working Group Meeting: Chairman's Corner

    Broader source: Energy.gov [DOE]

    Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—lists key utility program projects and upcoming utility energy service contract (UESC) training.

  10. September 2012, 10 CFR 851 Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools ...

  11. Hydrogen Storage Systems Analysis Working Group Meeting: Summary...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report Technical Assessment of Organic Liquid Carrier Hydrogen Storage Systems for ...

  12. Federal Utility Partnership Working Group (FUPWG) Seminar (Cinncinati, OH)

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) meets twice per year to share success stories, information on Federal Energy Management Program activities and other business.

  13. EM QA Working Group September 2011 Meeting Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area and QA Resources Focus Area of the EM QA Corporate ... Practices Working Group and Quality Assurance ... of AL6XN Piping * Analysis: - The following causes ...

  14. ASRAC Fans and Blower Working Group Creation Notice of Intent

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    rulemaking process, and instead explore openly with other parties all ideas that may emerge from the working group's discussions. E. Facilitator The facilitator will act as a...

  15. Federal Utility Partnership Working Group 2011 Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation-given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) ... contract (UESC) program goals. fupwgfall11unruh.pdf (1.37 MB) More Documents & ...

  16. Federal Utility Partnership Working Group: Atlanta Gas Light Resources

    Broader source: Energy.gov [DOE]

    Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—lists Altanta Gas Light (AGL) resources and features a map of its footprint.

  17. Hydrogen Storage Systems Analysis Working Group Meeting: Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The objective of these biannual Working Group meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes. PDF ...

  18. Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006

    Broader source: Energy.gov [DOE]

    This document provides a summary of the Hydrogen Storage Systems Anlaysis Working Group meeting in December 2006 in Washington, D.C.

  19. DOE Durability Working Group February 2013 Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group (DWG) Meeting Agenda Thursday, February 28, 2013 Crystal City Marriott Crystal City, VA 8:30 am Welcome and introductory comments Debbie Myers ...

  20. Webinar: ASRAC Commercial/Industrial Pumps Working Group

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the Appliance Standards and Rulemaking Federal Advisory Committee's (ASRAC) Commercial and Industrial Pumps Working Group. For more information,...

  1. 3210T1 WorkPlanning,Control&Auth;

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    http://www.jlab.org/div_dept/dir_off/public_affairs/logo/JLab_logo_text_white1.jpg TITLE: ES&H Manual DOCUMENT ID: 3210 Appendix T1 Work Planning, Control, and Authorization Procedure 1.0 Purpose This procedure defines work processes and controls and outlines how Jefferson Lab implements its Integrated Safety Management System (ISMS) into the planning and execution of work. These steps include: * Defining the Scope of Work * Analyzing the Hazards * Developing and Implementing Hazard Controls

  2. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4/8/14 Facilitator notes in blue May Committee meeting placeholder: Tuesday, May 6 Call placeholder: Tuesday, May 13, 1:30 p.m. June Committee meeting placeholder: Tuesday, June 10 Call placeholder: Tuesday, June 17 August (no committee meetings in July) Committee meeting placeholder: Tuesday, August 5 Call placeholder: Tuesday, August 12, 1:30 p.m. 100-F RI/FS and Proposed Plan Rev 0 (expected to prepare advice for June) Briefing on Long Term Stewardship RCRA Class 3 modifications [August RAP

  3. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 Work Plan Working draft - reflects comments received from PIC, HSEP, TWC and RAP committees (updated October 22, 2015) 1 Hanford Advisory Board Draft Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area

  4. Waste Management Committee Fiscal Year 2016 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP Recovery Operations Waste Stored at Waste Control Specialists Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY16-WP - March 9, 2016 (107.69

  5. Quality Work Plan Communications Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Requirement Quality Work Plan Communications Requirement Graphic of a conversation bubble. The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a communication requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement Once field standards and

  6. Quality Work Plan Guidelines and Standards Requirement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Guidelines and Standards Requirement Quality Work Plan Guidelines and Standards Requirement an icon of a page The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement All

  7. WM Committee FY'16 Work Plan

    Office of Environmental Management (EM)

    AT WORK WIPP AT WORK February 1, 2010 - 12:00pm Addthis Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up its 11th year of disposal operations. The Carlsbad Field Office (CBFO) manages the DOE's National TRU Program (NTP) Office and WIPP facility operations. TRU waste temporarily stored at DOE generator sites around the country is shipped to WIPP and disposed in rooms mined out of an ancient salt

  8. Joint Working Group for Fusion Safety | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Operations Careers/ Human Resources Directory Diversity and Inclusion Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer Contact Us Business Operations Careers/ Human Resources Directory Diversity and Inclusion Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab

  9. United States-Japan Nuclear Security Working Group | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) United States-Japan Nuclear Security Working Group March 24, 2014 The United States and Japan established a bilateral Nuclear Security Working Group (NSWG) in 2011 in response to a shared desire to demonstrate leadership in strengthening nuclear security worldwide and in support of the Nuclear Security Summit process. This group developed a Roadmap containing tangible actions in support of shared objectives and goals. When taken together, these goals

  10. Federal Utility Partnership Working Group Seminars | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Seminars Federal Utility Partnership Working Group Seminars The Federal Utility Partnership Working Group (FUPWG) meets twice per year to share success stories, information on Federal Energy Management Program activities and other business. Upcoming Seminar Puget Sound Energy logo. FUPWG Fall 2016 November 2-3, 2016 Bellevue, Washington Hosted by Puget Sound Energy Recent Seminar FUPWG Spring 2016 May 18-19, 2016 Cincinnati, Ohio Hosted by Duke Energy View presentations. Past Seminars

  11. Federal Utility Partnership Working Group Industry Commitment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Group Industry Commitment Federal Utility Partnership Working Group Industry Commitment Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of 1992 and subsequent executive orders. Federal agencies can contact Federal Utility Partnership Working Group utility partners for more information on assistance. Electric Utility Industry Pledge

  12. High Temperature Membrane Working Group, Minutes of Meeting on September

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14, 2006 | Department of Energy Group, Minutes of Meeting on September 14, 2006 High Temperature Membrane Working Group, Minutes of Meeting on September 14, 2006 These meeting minutes provide information about the High Temperature Membrane Working Group meeting on September 14, 2006 in San Francisco, Ca. htmwg_sept06_minutes.pdf (205.28 KB) More Documents & Publications Membrane Performance and Durability Overview for Automotive Fuel Cell Applications Discussion Overview High Temperature

  13. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  14. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  15. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/19/15 Facilitator notes in blue January Committee meeting placeholder: Wednesday, Jan. 13 Call placeholder: Wednesday, Jan. 19, 3:00 p.m. February Committee meeting placeholder: Wednesday, Feb. 10 Call placeholder: Tuesday, Feb. 16, 3:00 p.m. March Committee meeting placeholder: Wednesday, Mar. 16 Call placeholder: Tuesday, Mar. 22, 3:00 p.m.  Committee call to discuss issue manager work and finalize February agenda  WTP Communication Approach  Cesium/LAWPS  AY-102 Status (update

  16. Office of Inspector General fiscal year 1996 annual work plan

    SciTech Connect (OSTI)

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  17. 2008 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 8 High Temperature Membrane Working Group Meeting Archives 2008 High Temperature Membrane Working Group Meeting Archives View information from meetings of the High Temperature Membrane Working Group held in 2008. October 16, 2008, Honolulu, Hawaii This meeting was held in conjunction with the Pacific Rim Meeting on Electrochemical and Solid-State Science (PRIME). Meeting Agenda Minutes SEC's MEA Test Protocol, M.P. Rodgers, B. Li, P. Choi, D. Slattery, L. Bonville, H.R. Kunz, J.M.

  18. Catalyst Working Group Kick-off Meeting: Personal Commentary | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Catalyst Working Group Kick-off Meeting: Personal Commentary Catalyst Working Group Kick-off Meeting: Personal Commentary Personal commentary on future directions in fuel cell electrocatalysis, presented by Mark Debe, 3M, at the kick-off meeting of the U.S. Department of Energy Fuel Cell Technologies Program's Catalysis Working Group, held May 14, 2012, in Arlington, Virginia. 5_cwg_may2012_debe.pdf (812.78 KB) More Documents & Publications Advanced Cathode Catalysts and

  19. Catalysis Working Group Meeting: June 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Catalysis Working Group Meeting: June 2014 The Catalysis Working Group held a meeting on June 16, 2014, in Washington, D.C., in conjunction with the DOE Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting. Meeting Agenda and Presentations Catalysis Working Group June 2014 Meeting Agenda (100.38 KB) Are We There Yet? Pt-Alloy Catalysts-Anu Kongkanand, GM (1.05 MB) Pt-Co/C Catalysts: PEMFC Performance and Durability-Jim Waldecker, Ford (2.3 MB) Successes and

  20. First AEO2015 Oil and Gas Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    GAS MARKETS TEAMS SUBJECT: First AEO2015 Oil and Gas Working Group Meeting Summary ... The shorter AEO2015 will have 6 cases - Reference case, HighLow Oil Price cases, HighLow ...

  1. Catalysis Working Group Kick-Off Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arlington, VA - May 14, 2012 Catalysis Working Group Kick-off Meeting Co-Chairs: Piotr Zelenay Los Alamos National Laboratory Nancy L. Garland U.S. Department of Energy 2 2...

  2. Federal Utility Partnership Working Group Meeting: Washington Update

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentationgiven at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the Federal Buildings Personnel Training Act of 2010, Commit to Efficiency campaign, customer service, other Federal Energy Management Program (FEMP) activities, and more.

  3. 2014-07-08 Issuance: ASRAC Manufactured Housing Working Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-07-08 ASRAC Manufactured Housing Working Group ...

  4. Hydrogen Storage Systems Anlaysis Working Group Meeting, December...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document provides a summary of the Hydrogen Storage Systems Anlaysis Working Group meeting in December 2006 in Washington, D.C. PDF icon ssawgminutes1206.pdf More Documents ...

  5. Fall 2015 Federal Utility Partnership Working Group Seminar

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) meets twice a year to share success stories, get updates about the Federal Energy Management Program (FEMP), and to discuss FUPWG business.

  6. Federal Utility Partnership Working Group Meeting Notes | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Meeting Notes Spring 2013 Meeting Report (510.93 KB) Fall 2012 Meeting Report (606.19 KB) Spring 2012 Meeting Report (307.53 KB) Fall 2011 ...

  7. Federal Utility Partnership Working Group- Utility Interconnection Panel

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses solar/photovoltaic (PV) projects to connect with utility in California and their issues.

  8. Federal Utility Partnership Working Group 2011 Meeting: Washington Update

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—provides an overview of federal government goals and status, Federal Energy Management Program (FEMP) update, and utility energy services contract (UESC) program goals.

  9. Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Hydrogen Pipeline Working Group Workshop included more than 45 researchers and industry experts. The workshop provided an overview of hydrogen pipeline projects.

  10. DOE Durability Working Group May 2012 Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group (DWG) Monday, May 14, 2012, 8:00-10:00 am Gateway Salon I, Crystal Gateway Marriott Crystal City, VA Meeting Agenda 8:00 am Welcome and introductory ...

  11. DOE Durability Working Group May 2011 Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group Wednesday, May 11, 2011, 7:00-10:00 pm Marriott Crystal Gateway "Salon V" (Ballroom Level) Meeting Agenda 7:00 pm Welcome and introductory comments ...

  12. Collaborations with Other ARM Working Groups and with ASP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Collaborations with Other ARM Working Groups and with ASP * Cloud Properties - Aerosol indirect effects remote sensing * Cloud Modeling - Aerosol indirect effects modeling * Radiative Properties - BBHRP aerosol best estimate * ASP - CCN closure - Aerosol extinction closure

  13. US-India Energy Dialogue: Coal Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US-India Energy Dialogue: Coal Working Group US-India Energy Dialogue: Coal Working Group On May 31, 2005, then-U.S. Secretary of Energy, Dr. Samuel W. Bodman and Dr. Montek Singh Ahluwalia, Deputy Chairman Planning Commission of India, launched a new Energy Dialogue. The Energy Dialogue builds upon the broad range of existing energy cooperation between India and the United States, as well as develops new avenues of collaboration. The Energy Dialogue includes working groups in the areas of coal,

  14. Proper Sustainability: GAP Grant Proposal Work Plan Strategy Webinar

    Broader source: Energy.gov [DOE]

    In this webinar I will discuss the new GAP grant requirements for tribal environmental programs and strategies for crafting a work plan that focuses on capacity building activities.  My goal is to...

  15. NREL Assembles Industry Working Group to Advance Solar Securitization -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Releases | NREL Assembles Industry Working Group to Advance Solar Securitization Webinar focusing on SAPC to be held on March 22 March 19, 2013 The U.S. Department of Energy's (DOE)'s National Renewable Energy Laboratory (NREL) recently convened the Solar Access to Public Capital (SAPC) working group with a mission to enable securitization of solar PV assets and associated cash flows in the marketplace. SAPC's primary efforts center on the standardization of power purchase agreements,

  16. North American Energy Work Group Releases Updated Trilateral Energy Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Work Group Releases Updated Trilateral Energy Report North American Energy Work Group Releases Updated Trilateral Energy Report March 2, 2006 - 11:35am Addthis WASHINGTON , D.C. - U.S. Energy Secretary Samuel Bodman today released a report entitled North America - The Energy Picture II, which continues to show that North America is one of the world's most important regions for energy - producing about one-fourth of that global energy supply and consuming about

  17. Annual Energy Outlook 2014 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    : Electricity Working Group Meeting September 25, 2013 Electricity Analysis Team Office of Electricity, Coal, Nuclear, and Renewables Analysis Office of Energy Analysis WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Key Modeling updates from AEO2013 * Revised Reserve Margin and Capacity Market Methodology - Explicit Reserve Margin, Explicit Capacity Payment - Results in 3-5 mill higher electric prices * Operating/Spinning reserve

  18. Annual Energy Outlook 2017 1st Coal Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    7 1 st Coal Working Group Coal and Uranium Analysis Team August 31, 2016| Washington, D.C. WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES. DO NOT QUOTE OR CITE AS AEO2017 MODELING ASSUMPTIONS AND INPUTS ARE SUBJECT TO CHANGE. Agenda Coal and Uranium Analysis Team August 31, 2016 | Washington, D.C. 2 * EIA ongoing activities * Modeling focus for AEO2017 * Review of AEO2016 results * General Modeling Assumptions - Focus on productivity and other factors affecting price - Feedback from CWG

  19. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Working Group Workshop: Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines Code for Hydrogen Piping and Pipelines. B31 Hydrogen Section Committee to develop a new code for H2 piping and pipelines. hpwgw_code_hayden.pdf (105.33 KB) More Documents & Publications Hydrogen Transmission and Distribution Workshop American Society of Mechanical Engineers/Savannah River National Laboratory (ASME/SRNL) Materials and Components

  20. Infrared Thermography (IRT) Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrared Thermography (IRT) Working Group Infrared Thermography (IRT) Working Group Presented at the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado pvmrw13_ps3_pvmc_mcwilliams.pdf (1.52 MB) More Documents & Publications US & Japan TG 4 Activities of QA Forum Agenda for the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado Energy Auditor - Single Family 2.0: Interpreting Infrared

  1. International Working Group Meeting Focuses on Nuclear Power Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development and Financing of New Nuclear Projects | Department of Energy Financing of New Nuclear Projects International Working Group Meeting Focuses on Nuclear Power Infrastructure Development and Financing of New Nuclear Projects December 15, 2009 - 1:09pm Addthis VIENNA, AUSTRIA - The multi-nation Infrastructure Development Working Group (IDWG) held its fifth meeting and also a workshop on the financing of international nuclear power projects in Vienna, Austria, on December 9-10, 2009.

  2. International Working Group Meeting Focuses on Nuclear Power Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development and Needs | Department of Energy Needs International Working Group Meeting Focuses on Nuclear Power Infrastructure Development and Needs June 2, 2010 - 12:02pm Addthis VIENNA, Austria - The multi-nation Infrastructure Development Working Group (IDWG) of the Global Nuclear Energy Partnership (GNEP) held its sixth meeting on May 26-27, 2010, in Vienna, Austria. The two-day event included workshops on nuclear energy regulatory agency engagement and the infrastructure needs for

  3. Summary of AEO2015 Renewable Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE February 29, 2016 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Renewable Electricity Analysis Team SUBJECT: Summary of AEO2015 Renewable Electricity Working Group Meeting held on February 9, 2016 Presenter: Chris

  4. Summary of AEO2016 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE February 10, 2016 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Chris Namovicz Acting Team Leader for Electricity Analysis Team SUBJECT: Summary of AEO2016 Electricity Working Group Meeting held on February 10, 2016

  5. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Storage Systems Analysis Working Group Meeting Argonne DC Offices L'Enfant Plaza, Washington, DC December 4, 2007 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Kristin Deason Sentech, Inc. January 16, 2008 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting December 4, 2007 Argonne DC Offices, L'Enfant Plaza, Washington, DC Meeting Objectives This meeting was one of a continuing series of biannual meetings of the Hydrogen Storage Systems

  6. Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Argonne National Laboratory DC Offices 955 L'Enfant Plaza, North, SW, Suite 6000 Washington, DC December 12, 2006 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Laura Verduzco Sentech, Inc. February 28, 2007 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting December 12, 2006 955 L'Enfant Plaza, North, SW, Suite 6000, Washington, DC Meeting Objectives This meeting was one of a continuing series of biannual meetings of this Working Group. The

  7. INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORKING GROUP ICEIWG

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of 8 INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORKING GROUP ICEIWG May 29, 2013 Wild Horse Pass Hotel and Casino Chandler, Arizona MEETING OVERVIEW The U.S. Department of Energy Office (DOE) of Indian Energy (IE) hosted an Indian Country Energy and Infrastructure Working Group (ICEIWG) Meeting on Wednesday, May 29, 2013 in Chandler, Arizona. IE welcomed reappointed and new members to ICEIWG. The ICEIWG meeting was held prior to the seventh Tribal Leader Forum on "Leveraging Tribal Renewable

  8. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    5 Work Plan Approved at the 11/19/2014 NNMCAB Board Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2015 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  9. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    6 Work Plan Approved at the March 9, 2016 Combined Committee Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2016 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  10. Microsoft Word - FY09 Work Plan_External.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enhancing control systems security in the energy sector NSTB National SCADA Test Bed U.S. Department of Energy Office of Electricity Delivery and Energy Reliability DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (REVISED 07/31/2009) A plan of work for the National Laboratories that form the National SCADA Test Bed: Argonne National Laboratory Idaho National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Sandia National Laboratories Fiscal Year 2 0 0 9

  11. State and Tribal Government Working Group Visits the Fernald Preserve |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Fernald Preserve State and Tribal Government Working Group Visits the Fernald Preserve July 12, 2013 - 11:28am Addthis On June 4 and 5, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) hosted the State and Tribal Government Working Group (STGWG) at the Fernald Preserve in Ohio. This group-which receives support from the National Conference of State Legislatures-helps ensure that DOE facilities and sites are operated and cleaned up in compliance with

  12. Waste Contaminants at Military Bases Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-04

    The Waste Contaminants at Military Bases Working Group has screened six prospective demonstration projects for consideration by the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT). These projects include the Kirtland Air Force Base Demonstration Project, the March Air Force Base Demonstration Project, the McClellan Air Force Base Demonstration Project, the Williams Air Force Base Demonstration Project, and two demonstration projects under the Air Force Center for Environmental Excellence. A seventh project (Port Hueneme Naval Construction Battalion Center) was added to list of prospective demonstrations after the September 1993 Working Group Meeting. This demonstration project has not been screened by the working group. Two additional Air Force remediation programs are also under consideration and are described in Section 6 of this document. The following information on prospective demonstrations was collected by the Waste Contaminants at Military Bases Working Group to assist the DOIT Committee in making Phase 1 Demonstration Project recommendations. The remainder of this report is organized into seven sections: Work Group Charter`s mission and vision; contamination problems, current technology limitations, and institutional and regulatory barriers to technology development and commercialization, and work force issues; screening process for initial Phase 1 demonstration technologies and sites; demonstration descriptions -- good matches;demonstration descriptions -- close matches; additional candidate demonstration projects; and next steps.

  13. July 10-11, 2012, HSS Focus Group Training Work Group - Meeting Minutes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Work Group Meeting Minutes July 10 & 11, 2012 The Department of Energy (DOE) Office of Health, Safety and Security (HSS) Focus Group Training Work Group met at the DOE National Training Center (NTC) in Albuquerque, NM on Tuesday, July 10 and Wednesday, July 11, 2012. The meeting was chaired by the Work Group co-chairs, Karen Boardman (HSS/NTC), Pete Stafford (AFL-CIO BCTD/CPWR), and Julie Johnston (EFCOG). Attachment 1 is the Meeting Agenda; Attachment 2 is a list of meeting

  14. May 19, 2011, HSS/Union Focus Group Meeting - Draft Work Group Matrix

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06-22-11) WORK GROUPS HSS/ Union/ Stakeholder Leads Work Group Participants Improvement Issues/Goals Initial/Current Tasks Outputs 10 CFR 851 Pat Worthington CPWR USW Collectively work to ensure implementation of health and safety programs (851 Rule) within and among DOE site contractors to eliminate/minimize inconsistent requirements among M&I, M&O, LLC and SBA contractors/subcontractors. - Identify leads and participants - Develop charter - Goals/ Intended Output - Develop Task

  15. Final work plan : groundwater monitoring at Morrill, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  16. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  17. Annual Energy Outlook 2015 1st Coal Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    1 st Coal Working Group Coal and Uranium Analysis Team July 30, 2014 | Washington, D.C. WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES. DO NOT QUOTE OR CITE AS AEO2015 MODELING ASSUMPTIONS AND INPUTS ARE SUBJECT TO CHANGE. Changes in release cycles for EIA's AEO and IEO 2 * To focus more resources on rapidly changing energy markets and how they might evolve over the next few years, the U.S. Energy Information Administration is revising the schedule and approach for production of the

  18. Annual Energy Outlook 2016 2nd Coal Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    2 nd Coal Working Group Coal and Uranium Analysis Team February 9, 2016| Washington, D.C. WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES. DO NOT QUOTE OR CITE AS AEO2016 MODELING ASSUMPTIONS AND INPUTS ARE SUBJECT TO CHANGE. Key results for the AEO2016 Reference case 2 * Coal-fired generation, production, and capacity are all lower in the preliminary AEO2016 Reference case - Coal's share of total electricity generation falls from 38% in 2014 to 18% by 2040, compared to 33% in AEO2015 - Coal

  19. DOE Durability Working Group December 2014 Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group Meeting Tuesday, December 16, 2014, 9:00 am to 4:00 pm Argonne National Laboratory Energy Sciences Building, Building 241, Room A323 Lemont, IL 8:45 am Arrive and get settled. 9:00 am Welcome and introductory comments Debbie Myers (Argonne), Rod Borup (LANL), Donna Ho (DOE), Co-chairs of Durability Working Group 9:05 am Summary presentation of durability needs from 2013and 2014 workshops Donna Ho (DOE) Summary of new results and discussion of missing component-level

  20. Minutes from Durability Working Group Kick-off meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minutes from Durability Working Group (DWG) Kick-off Meeting 6/9/10 Contaminants Discussion on effect of air and system contaminants on performance and durability, initiated by S. Blanchet (Nuvera) Question of extent of impurity work in six newly-awarded durability projects represented at this meeting. None of the projects are specifically looking at the effect of system and air impurities on long- term performance degradation. New Argonne durability project does include task on effect of

  1. Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Held in Conjunction with the DOE Hydrogen Program Annual Merit Review Crystal Gateway Marriott, Arlington, VA June 11, 2008 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Elvin Yzugullu Sentech, Inc. July 18, 2008 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting June 11, 2008 Crystal Gateway Marriott, Arlington, VA Meeting Objectives This meeting was one of a continuing series of biannual meetings of the Hydrogen Storage Systems Analysis Working

  2. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 24, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Informational x x 2. 100 D/H Proposed Plan RAP Informational x x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. 324 Waste Sites RAP Informational 5. 618-10 VPU remediation RAP Informational 6. Central Plateau Inner Area Guidelines RAP Informational x 7. ERDF RAP

  3. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adopted by the Hanford Advisory Board on 11/5/2015, updated 12/21/15 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview and RAP Issue Manager Assignments) Topic Committee Assignment Issue Managers (lead noted in bold) Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Mattson, Suyama x 2. 100 D/H Proposed Plan RAP Engstrom, Mattson, Garnant, Leckband x 3. 100-N Proposed Plan RAP Cimon, Mattson x 4. Central Plateau Inner Area Guidelines RAP Cimon, Catrell,

  4. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2015June 18, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  5. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated December 21, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  6. Quality Work Plan Checklist and Resources - Section 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 1 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Question Yes No Resources V.5.1 1 Are you on track to submit current field guides and standards, including any necessary variance

  7. Quality Work Plan Checklist and Resources - Section 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 2 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Checklist Item Yes No V.5.1 2 Have you included language in Subgrantee contracts that clearly documents the SWS specifications and

  8. Quality Work Plan Checklist and Resources - Section 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 3 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The first 3 questions do not apply to the territories - instead the fourth question applies. App Section 15-4 Section Question Yes No Resources V.5.3 and/or V.8.3

  9. Quality Work Plan Checklist and Resources - Section 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 4 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The last question applies only to Hawaii and the Territories, and the previous 4 questions do not apply to Hawaii and the Territories. App Section 15-4 Section

  10. Microsoft Word - s05822_LEHR_WorkPlan

    Office of Legacy Management (LM)

    Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial

  11. Summary of the working group 4: Hadron spectroscopy

    SciTech Connect (OSTI)

    Crowe, K.M.

    1991-03-01

    This report is a summary of the working group 4 on hadron spectroscopy. The topics covered are: physics motivation; design of spectrometer; status of some existing hadron spectrometers; improvements to LASS; and arguments for/against a LASS-like design.

  12. September 8, 2011, HSS/Union Focus Group Work Group Telecom ...

    Energy Savers [EERE]

    The following outlines the union WG lead and co-lead volunteers for each of the Work Groups: 10 CFR 851: Doug Stephens (USW) - Lead; Barb McCabe (IUOE) - Co-Lead Training: Pete ...

  13. Tennessee Valley and Eastern Kentucky Wind Working Group

    SciTech Connect (OSTI)

    Katie Stokes

    2012-05-03

    In December 2009, the Southern Alliance for Clean Energy (SACE), through a partnership with the Appalachian Regional Commission, EKPC, Kentucky's Department for Energy Development and Independence, SACE, Tennessee's Department of Environment and Conservation, and TVA, and through a contract with the Department of Energy, established the Tennessee Valley and Eastern Kentucky Wind Working Group (TVEKWWG). TVEKWWG consists of a strong network of people and organizations. Working together, they provide information to various organizations and stakeholders regarding the responsible development of wind power in the state. Members include representatives from utility interests, state and federal agencies, economic development organizations, non-government organizations, local decision makers, educational institutions, and wind industry representatives. The working group is facilitated by the Southern Alliance for Clean Energy. TVEKWWG supports the Department of Energy by helping educate and inform key stakeholders about wind energy in the state of Tennessee.

  14. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  15. WPN 15-4 Quality Work Plan Requirement Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEATHERIZATION PROGRAM NOTICE 15-4 EFFECTIVE DATE: October 21, 2014 SUBJECT: Quality Work Plan Requirement Update PURPOSE: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and

  16. July 10-11, 2012, HSS Focus Group Training Work Group - Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HSS Focus Group Training Working Group (TWG) Subcommittee Meeting July 10, 2012 9:00 AM - 5:00 PM 8:30 a.m. Meet Visitors at Gazebo Evan Dunne 8:00 a.m. Pre-meeting for Co-Chairs to discuss how Co-Chairs will operate together:  Roles and Responsibilities  Co-Chair Conference Calls  Working Group Calls  Meetings, etc. Pete Stafford, Julie Johnston, Karen Boardman 9:00 a.m. Co-Chairs meet with TWG Subcommittee (HAMMER, NTC, NIEHS)  Discuss Expectations of Subcommittee ALL 10:00 a.m.

  17. Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline

    Broader source: Energy.gov [DOE]

    Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

  18. PROLIFERATION RESISTANCE AND PHYSICAL PROTECTION WORKING GROUP: METHODOLOGY AND APPLICATIONS

    SciTech Connect (OSTI)

    Bari R. A.; Whitlock, J.; Therios, I.U.; Peterson, P.F.

    2012-11-14

    We summarize the technical progress and accomplishments on the evaluation methodology for proliferation resistance and physical protection (PR and PP) of Generation IV nuclear energy systems. We intend the results of the evaluations performed with the methodology for three types of users: system designers, program policy makers, and external stakeholders. The PR and PP Working Group developed the methodology through a series of demonstration and case studies. Over the past few years various national and international groups have applied the methodology to nuclear energy system designs as well as to developing approaches to advanced safeguards.

  19. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  20. AEO 2014 Renewable Electricity Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    DATE: September 30, 2013 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Office of Energy Analysis Alan Beamon Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis FROM: Renewable Electricity Analysis Team SUBJECT: AEO 2014 Renewable Electricity Working Group Meeting Summary ATTENDEES: In person John Conti Alan Beamon Bob Eynon Chris Namovicz Danielle Lowenthal-Savy Erin Boedecker Gwen Bredehoeft Jim Diefenderfer Marie Rinkoski Spangler Michael

  1. AEO2014 Coal Working Group Meeting I Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    July 22, 2013 MEMORANDUM TO: John Conti Assistant Administrator for Energy Analysis Alan Beamon Director, Office of Electricity, Coal, Nuclear, and Renewables Analysis FROM: Coal and Uranium Analysis Team SUBJECT: AEO2014 Coal Working Group Meeting I Summary Attendees (41) Name Affiliation Greg Adams (Moderator) US DOE: EIA Vlad Dorjets Bob Eynon Karen Freedman Tyler Hodge Paul Holtberg Elias Johnson Ayaka Jones Diane Kearney Mike Leff Mike Mellish Carrie Milton Nick Paduano Margaret Cook US

  2. AEO2014 Liquid Fuels Markets Working Group Meeting 1

    U.S. Energy Information Administration (EIA) Indexed Site

    2 AEO2014 Liquid Fuels Markets Working Group Meeting 1 July 24, 2013 Attendance (In Person) (EIA) John Powell, Mindi Farber-DeAnda, Mike Cole, Beth May, Adrian Geagla, Vish Mantri, Tony Radich, Irene Olson, Julie Harris (non-EIA) Jeff Meyer (HIS CERA, Oil Market Analyst), Adam Christensen (Johns Hopkin) Attendance (WebEx) Dave Schmalzer, Seth Snyder (Argonne National Laboratory), Donald Hanson (Argonne National Laboratory), Wyatt Thompson (FAPRI, University of Missouri), Jarrett Whistance

  3. AEO2014 Oil and Gas Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    9 August 12, 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS FROM: ANGELINA LAROSE TEAM LEAD NATURAL GAS MARKETS TEAM JOHN STAUB TEAM LEAD EXPLORATION AND PRODUCTION ANALYSIS TEAM EXPLORATION AND PRODUCTION and NATURAL GAS MARKETS TEAMS SUBJECT: First AEO2014 Oil and Gas Working Group Meeting Summary (presented on July 25, 2013) Attendees: Anas Alhajji (NGP)* Samuel Andrus (IHS)* Emil Attanasi (USGS)* Andre Barbe (Rice University) David J. Barden (self) Joseph

  4. Annual Energy Outlook 2014 1st Coal Working Group

    U.S. Energy Information Administration (EIA) Indexed Site

    1 st Coal Working Group Coal and Uranium Analysis Team July 22, 2013| Washington, D.C. Topics for discussion * Recoding to AIMMS; otherwise, no changes to Coal Market Module (CMM) structure or equations from AEO2013 * Legislation and regulations * Retirements and additions * Pollution control retrofits * Coal productivity trends * Projected consumption (CTL), production, exports, and prices * Side cases 2 Coal and Uranium Analysis Team Washington, DC, July 22, 2013 Key results for the AEO2013

  5. Used Fuel Disposition Working Group Presentations, June 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Presentations, June 2016 - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  6. Transportation Working Group (TWG) Meeting Friday, November 16, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group (TWG) Meeting Friday, November 16, 2012 9-11am Nohemi Brewer, U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Transportation Manager, opened the meeting at 9:05am with 23 in-person attendees and two via video teleconferencing in Carson City. Following an introduction by Ms. Brewer, participants introduced themselves and identified their organization. Represented organizations included: NNSA/NSO; National Security Technologies, LLC;

  7. DOE-EERE Durability Working Group Meeting, October 10, 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-EERE Durability Working Group Meeting October 10, 2010 Agenda 6 pm Welcome and introductory comments Debbie Myers (Argonne) and Rod Borup (Los Alamos) - co-chairs 6:15 pm Overview of electrocatalyst and support degradation mechanisms Sarah Ball, Johnson Matthey Fuel Cells 6:45 pm Discussion/presentations by project PIs/representatives (5-10 minutes each) * Overview of electrocatalyst and support degradation aspects of projects * Protocols/testing procedures/diagnostics used to resolve the

  8. US-EU-Japan Working Group on Critical Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US-EU-Japan Working Group on Critical Materials 4 th Annual Meeting Iowa State University Hosted by The Critical Materials Institute The Ames Laboratory September 8, 2014 AGENDA 8:30 Registration 9:00 Welcome Alex King, Director, Critical Materials Institute Opening Remarks 9:10 Akito Tani, Deputy Director-General, Manufacturing Industries Bureau, MET 9:20 Gwenole Cozigou, Director, DG Enterprise and Industry 9:30 Mark Johnson, Director, Advanced Manufacturing Office, DOE Session 1: Anticipating

  9. July 2012, 10 CFR 851 Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM)

  10. Second AEO2014 Liquids Fuels Markets Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    5, 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS JOHN POWELL TEAM LEADER LIQUID FUELS MARKET TEAM MICHAEL SCHAAL DIRECTOR OFFICE OF ENERGY ANALYSIS FROM: LIQUID FUELS MARKET TEAM SUBJECT: Second AEO2014 Liquid Fuels Markets Working Group Meeting Summary (presented on 09-19-2013) Attendees: (EIA) John Powell, Mindi Farber-DeAnda, Mike Cole, Beth May, Adrian Geagla, Vishakh Mantri, Tony Radich, Irene Olson, Julie Harris, Arup Mallik, Mike Bredehoeft Seth Meyer (USDA)

  11. Second AEO2014 Macro-Industrial Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    7, 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JAMES TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION & EFFICIENCY ANALYSIS LYNN WESTFALL DIRECTOR OFFICE OF ENERGY MARKETS & FINANCIAL ANALYSIS FROM: MACROECONOMIC & INDUSTRIAL ENERGY CONSUMPTION & EFFICIENCY ANALYSIS TEAMS SUBJECT: Second AEO2014 Macro-Industrial Working Group Meeting Summary (presented on 09-26-2013) Attendees: Bob Adler (EIA) Robert

  12. Second AEO2014 Oil and Gas Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    7 November 12, 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS FROM: ANGELINA LAROSE TEAM LEAD NATURAL GAS MARKETS TEAM JOHN STAUB TEAM LEAD EXPLORATION AND PRODUCTION ANALYSIS TEAM EXPLORATION AND PRODUCTION and NATURAL GAS MARKETS TEAMS SUBJECT: Second AEO2014 Oil and Gas Working Group Meeting Summary (presented September 26, 2013) Attendees: Robert Anderson (DOE) Peter Balash (NETL)* David Bardin (self) Joe Benneche (EIA) Philip Budzik (EIA) Kara Callahan

  13. Second AEO2014 Transportation Working Group Meeting Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    , 2013 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JIM TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION AND EFFICIENCY ANALYSIS FROM: TRANSPORTATION CONSUMPTION & EFFICIENCY ANALYSIS TEAM SUBJECT: Second AEO2014 Transportation Working Group Meeting Summary (presented on 09-25-2013) Attendees: Nicholas Chase (EIA/OECEA) Carrie Hughes-Cromwick (EIA/OES) Paul Holtberg (EIA/OEA) Trisha Hutchins (EIA/OECEA) Jim Kliesch

  14. Second AEO2016 Macro-Induistrial Working Group Meeting summary

    U.S. Energy Information Administration (EIA) Indexed Site

    March 21, 2016 MEMORANDUM FOR: JOHN CONTI ASSISTANT ADMINISTRATOR FOR ENERGY ANALYSIS PAUL HOLTBERG TEAM LEADER ANALYSIS INTEGRATION TEAM JAMES TURNURE DIRECTOR OFFICE OF ENERGY CONSUMPTION & EFFICIENCY ANALYSIS LYNN WESTFALL DIRECTOR OFFICE OF ENERGY MARKETS & FINANCIAL ANALYSIS FROM: MACROECONOMIC & INDUSTRIAL ENERGY CONSUMPTION & EFFICIENCY ANALYSIS TEAMS SUBJECT: Second AEO2016 Macro-Industrial Working Group Meeting Summary, presented on 02-18-2016 Attendees: Nate Aden

  15. Summary of AEO2015 Renewable Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    August 13, 2014 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Jim Diefenderfer Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Renewable Electricity Analysis Team SUBJECT: Summary of AEO2015 Renewable Electricity Working Group Meeting held on July 24, 2014 Presenters: Chris Namovicz, Gwen Bredehoeft Topics included AEO2014 model and data updates, a summary of AEO2014 model results,

  16. Summary of First AEO2014 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    9, 2013 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Alan Beamon Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Electricity Analysis Team SUBJECT: Summary of First AEO 2014 Electricity Working Group Meeting held on July 24, 2013 ATTENDEES: Diefenderfer, Jim Aniti, Lori Milton, Carrie Jones, Jeff Martin, Laura Bredehoeft, Gwendolyn Eynon, Bob Leff, Mike Mellish, Mike Kearney, Diane

  17. Summary of Second AEO 2014 Electricity Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    7, 2013 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Alan Beamon Office Director Office of Electricity, Coal, Nuclear, and Renewables Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Electricity Analysis Team SUBJECT: Summary of Second AEO 2014 Electricity Working Group Meeting held on September 25, 2013 ATTENDEES: Adams, Greg (EIA OEA) Aniti, Lori (EIA OEA) Bredehoeft, Gwendolyn (EIA OEA) Crozat, Matthew P. (US DOE: Office of Nuclear Energy)

  18. Summary of Second AEO 2015 Working Group Meeting

    U.S. Energy Information Administration (EIA) Indexed Site

    November 7, 2014 MEMORANDUM FOR: John Conti Assistant Administrator for Energy Analysis Paul Holtberg Team Leader Analysis Integration Team FROM: Office of Electricity, Coal, Nuclear, and Renewables Analysis SUBJECT: Summary of Second AEO 2015 Working Group Meeting held on September 15, 2014 ATTENDEES: 21 EIA, 68 external (list provided following meeting summary) Presentation topics included a review of the AEO2015 publication schedule and contents, an overview of model assumptions updates in

  19. INDIAN COUNTRY ENERGY AND INFRASTRUCTURE WORKING GROUP ICEIWG

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 21, 2012 NEW ORLEANS, LOUISIANA Wyndham Garden Hotel-Baronne Plaza 201 Baronne Street New Orleans, LA 70112 (504) 522-0083 AGENDA MEETING ROOM - MAGNOLIA ROOM WEDNESDAY, MARCH 21, 2012 4:30pm - 6:30pm INTERNAL WORKING GROUP SESSION FOR ICEIWG MEMBERS ICEIWG Members and Alternates  Rodney Bordeaux, Chairman, Rosebud Sioux Tribe  Barney Enos, Jr., District 4 Community Council, Gila River Indian Community  Jim Manion, Warm Springs Power, Confederated Tribes of the Warm Springs

  20. Tank waste remediation system multi-year work plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  1. DOE Durability Working Group May 2015 Meeting Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Meeting Agenda DOE Durability Working Group May 2015 Meeting Agenda Agenda for the DOE Durability Working Group Meeting held May 28, 2015, in Lemont, Illinois. DOE Durability Working Group May 2015 Meeting Agenda (22.11 KB) More Documents & Publications DOE Durability Working Group December 2014 Meeting Agenda DOE Durability Working Group June 2014 Meeting Agenda DOE Durability Working Group May

  2. Combustion Dynamics Facility: April 1990 workshop working group reports

    SciTech Connect (OSTI)

    Kung, A.H.; Lee, Y.T.

    1990-04-01

    This document summarizes results from a workshop held April 5--7, 1990, on the proposed Combustion Dynamics Facility (CDF). The workshop was hosted by the Lawrence Berkeley Laboratory (LBL) and Sandia National Laboratories (SNL) to provide an opportunity for potential users to learn about the proposed experimental and computational facilities, to discuss the science that could be conducted with such facilities, and to offer suggestions as to how the specifications and design of the proposed facilities might be further refined to address the most visionary scientific opportunities. Some 130 chemical physicists, combustion chemists, and specialists in UV synchrotron radiation sources and free-electron lasers (more than half of whom were from institutions other than LBL and SNL) attended the five plenary sessions and participated in one or more of the nine parallel working group sessions. Seven of these sessions were devoted to broadening and strengthening the scope of CDF scientific opportunities and to detail the experimental facilities required to realize these opportunities. Two technical working group sessions addressed the design and proposed performance of two of the major CDF experimental facilities. These working groups and their chairpersons are listed below. A full listing of the attendees of the workshop is given in Appendix A. 1 tab.

  3. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Interim Work Plan Adopted by consensus September 5, 2014; comments from October committee discussions 1 Proposed additions from October TWC and RAP committee discussions in RED Topic Quarter 1 10/ 2014 - 12/2014 Quarter 2 01/2015- 03/2015 Quarter 3 04/2015 - 06/2015 Quarter 4 07/2015 - 09 2015 Committee Assignment (lead in Bold) Deferred Maintenance Plan Agency Lead: Kyle Rankin, DOE-RL Chief Engineer Action: Policy discussion Potential HAB Action: _____ Context: The status of structures on

  4. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 05.18.16 *Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Advice [X] 2. Critical Infrastructure Updates *RAP/HSEP/TWC Advice [X] 3. PFP Progress *RAP/HSEP Agency briefing X 4. Sludge retrieval RAP Agency briefing X 5. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [X] 6. Risk-based retrieval,

  5. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 8/31/2016 * Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Agency briefing, advice [x] 2. Sludge retrieval RAP Agency briefing x x 3. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [x] 4. River Corridor updates RAP Agency briefing 5. Groundwater updates RAP Agency briefing x x x x 6. Central

  6. TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic

    Office of Environmental Management (EM)

    Group | Department of Energy Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group May 17, 2007 (10.98 KB) January 16, 2007 (14.41 KB) August 31, 2006 (16.39 KB) July 27, 2006 (19.28 KB) June 8, 2006 (15.79 KB) April 20, 2006 (19.91 KB) March 9, 2006 (19.65 KB) January 26, 2006 (20.86 KB) November 9, 2005 (24.38 KB) September 15, 2005 (32.13 KB) April 28, 2005 (19.16 KB) March 24, 2005 (28.33 KB) February 24, 2005 (32.77

  7. Chair, CTBT working group B Radionuclide Expert Group and the U.S.

    National Nuclear Security Administration (NNSA)

    Radionuclide Subgroup of the Verification Monitoring Task Force, Pacific Northwest National Laboratory | National Nuclear Security Administration | (NNSA) Chair, CTBT working group B Radionuclide Expert Group and the U.S. Radionuclide Subgroup of the Verification Monitoring Task Force, Pacific Northwest National Laboratory Ted Bowyer Ted Bowyer Ted Bowyer has been appointed a member of the National Academy of Sciences Comprehensive Nuclear Test-Ban Treaty panel. With the Obama Administration

  8. April 24, 2012, HSS Focus Group Training Working Group (TWG) Meeting - Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Charter Telecom April 24, 2012 11:00 am - 12:00 pm EST Central Call-in Locations: GTN C-411 / FORS 7G-040 Call-In: 301-903-6355 PROPOSED AGENDA Introductory Remarks......................................................Bill Eckroade Meeting Purpose/Process..........................................Mari-Jo Campagnone Pre-Decisional Draft Work Group Charter Discussion/Comment Resolution (1) 851............................Pat Worthington/Doug Stephens/Richard DeBusk - Implementation - Training

  9. July 10-11, 2012, HSS Focus Group Training Work Group - Attendees

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HSS Focus Group Training Work Group Meeting Minutes July 10 & 11, 2012 Attendees Pete Stafford BCTD Gary Karnofski HAMMER Karen McGinnis HAMMER Karen Boardman NTC Evan Dunne NTC Pete Turcic NTC Ted Giltz HAMMER Julie Johnston EFCOG Pete O'Connell HS-11 Dan Marsick HS-11 Chip Hughes NIEHS Ted Outwater NIEHS Sharon Beard NIEHS Jim Remington NIEHS Kathy Ahlmark NIEHS Brian Killand HAMMER Randy Coleman HAMMER Bob Legard HAMMER Deborah Weinstock NIEHS Belinda Holley, Sandia Doug Stephens, USW

  10. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  11. FY 95 engineering work plan for the design reconstitution implementation action plan

    SciTech Connect (OSTI)

    Bigbee, J.D.

    1994-11-09

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

  12. Subsurface Site Characterization Work Plan for the Rulison Site, Colorado

    Office of Legacy Management (LM)

    Subsurface Site Characterization Work Plan for the Rulison Site, Colorado Controlled Copy No.: Revision No.: 0 October 2004 Approved for public release; further dissemination unlimited. DOE/NV--1009 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at

  13. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2015 Work Plan-Facilitator notes on midyear status for TWC-lead topics (10/22/15) Page 1 of 3 Topic Committee Assignment Potential FY 2015 Action/Product Context 6-Month Status (IM, Committee, Advice, Deferred, No Action) 6. Safety Culture Improvement Efforts TWC Informational Improvement actions in response to the June 2014 follow-up Assessment of Safety Culture - focusing on Office of River Protection (ORP) and the Waste Treatment and Immobilization Plant (WTP). Report anticipated

  14. Tevatron-for-LHC Report of the QCD Working Group

    SciTech Connect (OSTI)

    Albrow, Michael G.; Begel, M.; Bourilkov, D.; Campanelli, M.; Chlebana, F.; De Roeck, A.; Dittmann, J.R.; Ellis, S.D.; Field, B.; Field, R.; Gallinaro, M.; /Fermilab /Rochester U. /Florida U. /Geneva U. /CERN /Baylor U. /Washington U., Seattle /Florida State U. /Rockefeller U. /Prague, Tech. U. /Michigan State U.

    2006-10-01

    The experiments at Run 2 of the Tevatron have each accumulated over 1 fb{sup -1} of high-transverse momentum data. Such a dataset allows for the first precision (i.e. comparisons between theory and experiment at the few percent level) tests of QCD at a hadron collider. While the Large Hadron Collider has been designed as a discovery machine, basic QCD analyses will still need to be performed to understand the working environment. The Tevatron-for-LHC workshop was conceived as a communication link to pass on the expertise of the Tevatron and to test new analysis ideas coming from the LHC community. The TeV4LHC QCD Working Group focused on important aspects of QCD at hadron colliders: jet definitions, extraction and use of Parton Distribution Functions, the underlying event, Monte Carlo tunes, and diffractive physics. This report summarizes some of the results achieved during this workshop.

  15. NSF Cybersecurity Center of Excellence, ESnet Organize Working Group on

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Science Threats NSF Cybersecurity Center of Excellence, ESnet Organize Working Group on Open Science Threats News & Publications ESnet News Media & Press Publications and Presentations Galleries ESnet Awards and Honors Contact Us Media Jon Bashor, jbashor@lbl.gov, +1 510 486 5849 or Media@es.net Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide

  16. Working Group Reports A Short-Wave Radiometer Array Across

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working Group Reports A Short-Wave Radiometer Array Across the Tropical Pacific Ocean as a Component of the TOGA-TAO Buoy Array R. M. Reynolds Brookhaven National Laboratory Upton, New York Introduction The purpose of this document is to bring together pertinent information concerning the NOAA TOGA-TAO buoy array so that a decision can be made for the following questions: 1. Are the scientific gains from an array of short-wave radiation sensors in the equatorial Pacific Ocean sufficiently

  17. Microsoft Word - Aerosol Working Group_Norfolk 2008.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM Aerosol Working Group, Agenda, Monday, March 10, 2008 15:00 0:13 Flynn 4STAR - a next-generation spectrometer for sky-scanning solar tracking radiometry 15:13 0:13 Yu FastTRAC 15:26 0:13 Obland Initial Airborne High Spectral Resolution Lidar (HSRL) Results from the Cumulus Humilis Aerosol Processing Study (CHAPS) and Cloud and Land Surface Interaction Campaign (CLASIC) 15:39 0:13 Kim Efficacy of Aerosol - Cloud Interactions Under Varying Meteorological Conditions: Southern Great Plains Vs.

  18. DOE Durability Working Group October 2012 Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Durability Working Group October 7, 2012 Meeting Agenda Hilton Hawaiian Village, Honolulu, HI 8:00 am Welcome and introductory comments Debbie Myers (Argonne), Rod Borup (Los Alamos) - co-chairs Nancy Garland (DOE) 8:10 am Dan Hussey, "Neutron Imaging of Fuel Cells at NIST" 8:35 am Discussion/presentations by project PIs/representatives (5 minutes each)  Overview/summary of major conclusions from projects thus far  Ballard, LANL-Borup, Argonne, LANL-Mukund, NREL, HNEI, 3M

  19. DOE-EERE Durability Working Group Meeting Notes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-EERE Durability Working Group (DWG) Meeting Thursday, October 13, 2011 Boston, MA Meeting Notes D. Myers and R. Borup Meeting Agenda 6:30 pm Welcome and introductory comments Debbie Myers (Argonne) and Rod Borup (Los Alamos) - co-chairs 6:40-7:45 pm Descriptions and summaries of results of modeling efforts in durability projects Dane Morgan, University of Wisconsin-Madison Srikanth Arisetty, ANL Adam Weber, LBNL Shanna Knights, Ballard Sergei Burlatsky, UTC Power Jean St-Pierre, University

  20. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop Augusta, Georgia August 31, 2005 Louis Hayden, PE Chair ASME B31.12 3 Presentation Outline * Approval for new code development * Charge from BPTCS to B31 Standards Committee for Hydrogen Piping/Pipeline code development * B31.12 Status & Structure * Hydrogen Pipeline issues * Research Needs * Where Do We Go From Here? 4 Code for Hydrogen Piping and Pipelines * B31 Hydrogen Section Committee to develop a new code for H 2

  1. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary...

    Office of Environmental Management (EM)

    Departmental level o Manages issuesproblems o Coordination, interface o Advance ... study results and implications * Emergency planning and preparedness efforts - Emergency ...

  2. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  3. Closing plenary summary of working group 4 instrumentation and controls for ERL2011

    SciTech Connect (OSTI)

    Gassner, D.; Obina, T.

    2011-10-16

    Working group 4 was charged with presentations and discussions on instrumentation and controls with regards to Energy Recovery Linacs (ERL). There were 4 sessions spanning 3.5 hours in which 7 talks were delivered, the first being an invited plenary presentation. The time allotted for each talk was limited to 20-25 minutes in order to allow 5-10 minutes for discussion. Most of the talks were held in joint session with working group 5 (Unwanted Beam Loss). This format was effective for the purpose of this workshop. A final series of discussion sessions were also held with working group 5. Summary of the working group 4 activities, presented in the closing plenary session. We had a plenary presentation on operational performance, experience, and future plans at the existing ERL injector prototype at Cornell. This included instrumentation data, controls system configurations, as well as description of future needs. This was followed by four talks from KEK and RIKEN/SPring-8 that described electron beam instrumentation already in use or under development that can be applied to ERL facilities. The final talks described the ERLs under construction at KEK and BNL. The format of having joint sessions with working group 5 was beneficial as there were a significant number of common topics and concerns with regards to the causes of beam loss, instrumentation hardware, and techniques used to measure and analyze beam loss.

  4. HEP-FCE Working Group on Libraries and Tools

    SciTech Connect (OSTI)

    Borgland, Anders; Elmer, Peter; Kirby, Michael; Patton, Simon; Potekhin, Maxim; Viren, Brett; Yanny, Brian

    2014-12-19

    The High-Energy Physics Forum for Computational Excellence (HEP-FCE) was formed by the Department of Energy as a follow-up to a recent report from the Topical Panel on Computing[1] and the associated P5 recommendation[2]. It is a pilot project distributed across the DOE Labs. During this initial incubation period the Forum is to develop a plan for a robust, long-term organization structure and a functioning web presence for forum activities and outreach, and a study of hardware and software needs across the HEP program. In the following sections we give this working group’s “vision” for aspects and qualities we wish to see in a future HEP-FCE. We then give a prioritized list of technical activities with suggested scoping and deliverables that can be expected to provide cross-experiment benefits. The remaining bulk of the report gives a technical survey of some specific “areas of opportunity” for cross-experiment benefit in the realm of software libs/tools. This survey serves as support for the vision and prioritized list. For each area we describe the ways that cross-experiment benefit is achieved today, as well as describe known failings or pitfalls where such benefit has failed to be achieved and which should be avoided in the future. For both cases, we try to give concrete examples. Each area then ends with an examination of what opportunities exist for improvements in that particular area.

  5. The QCD/SM working group: A Summary report

    SciTech Connect (OSTI)

    Alekhin, S.; Balazs, C.; Ball, R.; Binoth, T.; Boos, E.; Botje, M.; Cacciari, M.; Catani, S.; Del Duca, V.; Dobbs, M.; Ellis, S.D.; Field, R.; deFlorian, D.; Forte, S.; Gardi, E.; Gehrmann, T.; Gehrmann-De Riddler, A.; Giele, W.; Glover, E.W.N.; Grazzini, M.; Guillet, J.-Ph.; HeinRich, G.; Huston, J.; Hinchliffe, I.; Llyin, V.; Kanzaki, J.; Kato, K.; Kersevan, B.; Kidonakis, N.; Kulesza, A.; Kurihara, Y.; Laenen, E.; Lassila-Perini, K.; Lonnblad, L.; Magnea, L.; Mangano, M.; Mazumudar, K.; Moch, S.; Mrenna, S.; Nadolsky, P.; Nason, P.; Olness, F.; Paige, F.; Puljak, I.; Pumplin, J.; Richter-Was, E.; Salam, G.; Scalise, R.; Seymour, M.; Sjostrand, T.; Sterman, G.; Monnesmann, M.; Tournefier, E.; Vogelsang, W.; Vogt, A.; Vogt, R.; Webber, B.; Yuan, C.-P.; Zeppenfeld, D.

    2002-04-01

    This report documents the results obtained by the Working Group on Quantum Chromodynamics and the Standard Model for the Workshop ''Physics at TeV Colliders,'' Les Houches, France, 26 May - 6 June 2003. After a Monte Guide description, the first contributions report on progress in describing multiple interactions, important for the LHC, and underlying events. An announcement of a Monte Carlo database, under construction, is then followed by a number of contributions improving parton shower descriptions. Subsequently, a large number of contributions address resummations in various forms, after which follow studies of QCD effects in pion pair, top quark pair and photon pair plus jet production. After a study of electroweak corrections to hadronic precision observables, the report ends by presenting recent progress in methods to compute finite order corrections at one-loop with many legs, and at two-loop.

  6. In-well vapor stripping drilling and characterization work plan

    SciTech Connect (OSTI)

    Koegler, K.J.

    1994-03-13

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable.

  7. Microsoft PowerPoint - MTL DO Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BUILDING STRONG Water Quality Profiles BUILDING STRONG Water Control Plan Fish Spawn: The objective is to enhance fish and wildlife to as great an extent as ...

  8. Microsoft PowerPoint - Highlights of the Industry Working Group...

    National Nuclear Security Administration (NNSA)

    Plan for a proof-of-concept demonstration of a standardized, machine-readable ... (London) Proof-of-concept Demonstration - Establish test objectives and ...

  9. The QCD/SM Working Group: Summary Report

    SciTech Connect (OSTI)

    M. Dobbs et al.

    2004-08-05

    Among the many physics processes at TeV hadron colliders, we look most eagerly for those that display signs of the Higgs boson or of new physics. We do so however amid an abundance of processes that proceed via Standard Model (SM) and in particular Quantum Chromodynamics (QCD) interactions, and that are interesting in their own right. Good knowledge of these processes is required to help us distinguish the new from the known. Their theoretical and experimental study teaches us at the same time more about QCD/SM dynamics, and thereby enables us to further improve such distinctions. This is important because it is becoming increasingly clear that the success of finding and exploring Higgs boson physics or other New Physics at the Tevatron and LHC will depend significantly on precise understanding of QCD/SM effects for many observables. To improve predictions and deepen the study of QCD/SM signals and backgrounds was therefore the ambition for our QCD/SM working group at this Les Houches workshop. Members of the working group made significant progress towards this on a number of fronts. A variety of tools were further developed, from methods to perform higher order perturbative calculations or various types of resummation, to improvements in the modeling of underlying events and parton showers. Furthermore, various precise studies of important specific processes were conducted. A significant part of the activities in Les Houches revolved around Monte Carlo simulation of collision events. A number of contributions in this report reflect the progress made in this area. At present a large number of Monte Carlo programs exist, each written with a different purpose and employing different techniques. Discussions in Les Houches revealed the need for an accessible primer on Monte Carlo programs, featuring a listing of various codes, each with a short description, but also providing a low-level explanation of the underlying methods. This primer has now been compiled and a

  10. The QCD/SM working group: Summary report

    SciTech Connect (OSTI)

    Dobbs, Matt; Frixione, S.; Laenen, E.; De Roeck, A.; Tollefson, K.; Andersen, J.; Balazs, C.; Banfi, A.; Bernreuther, W.; Binoth, T.; Brandenburg, A.; Buttar, C.; Cao, C-H.; Cruz, A.; Dawson, I.; DelDuca, V.; Drollinger, V.; Dudko, L.; Eynck, T.; Field, R.; Grazzini, M.; Guillet, J.P.; Heinrich, G.; Huston, J.; Kauer, N.; Kidonakis, N.; Kulesza, A.; Lassila-Perini, K.; Magnea, L.; Mahmoudi, F.; Maina, E.; Maltoni, F.; Nolten, M.; Moraes, A.; Moretti, S.; Mrenna, S.; Nagy, Z.; Olness, F.; Puljak, I.; Ross, D.A.; Sabio-Vera, A.; Salam, G.P.; Sherstnev, A.; Si, Z.G.; Sjostrand, T.; Skands, P.; Thome, E.; Trocsanyi, Z.; Uwer, P.; Weinzierl, S.; Yuan, C.P.; Zanderighi,G.; Zanderighi, G.

    2004-04-09

    Among the many physics processes at TeV hadron colliders, we look most eagerly for those that display signs of the Higgs boson or of new physics. We do so however amid an abundance of processes that proceed via Standard Model (SM) and in particular Quantum Chromodynamics (QCD) interactions, and that are interesting in their own right. Good knowledge of these processes is required to help us distinguish the new from the known. Their theoretical and experimental study teaches us at the same time more about QCD/SM dynamics, and thereby enables us to further improve such distinctions. This is important because it is becoming increasingly clear that the success of finding and exploring Higgs boson physics or other New Physics at the Tevatron and LHC will depend significantly on precise understanding of QCD/SM effects for many observables. To improve predictions and deepen the study of QCD/SM signals and backgrounds was therefore the ambition for our QCD/SM working group at this Les Houches workshop. Members of the working group made significant progress towards this on a number of fronts. A variety of tools were further developed, from methods to perform higher order perturbative calculations or various types of resummation, to improvements in the modeling of underlying events and parton showers. Furthermore, various precise studies of important specific processes were conducted. A significant part of the activities in Les Houches revolved around Monte Carlo simulation of collision events. A number of contributions in this report reflect the progress made in this area. At present a large number of Monte Carlo programs exist, each written with a different purpose and employing different techniques. Discussions in Les Houches revealed the need for an accessible primer on Monte Carlo programs, featuring a listing of various codes, each with a short description, but also providing a low-level explanation of the underlying methods. This primer has now been compiled and a

  11. DOE Durability Working Group May 2012 Meeting Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Meeting Agenda DOE Durability Working Group May 2012 Meeting Agenda Meeting agenda from the Spring 2012 Durability Working Group Meeting sponsored by the U.S. Department of Energy (DOE) Fuel Cell Technologies Program. durability_working_group_agenda_may_2012.pdf (19.95 KB) More Documents & Publications DOE Durability Working Group October 2011 Meeting Notes DOE Durability Working Group February 2013 Meeting Agenda DOE Durability Working Group October

  12. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary - 851 Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    851 Implementation Work Group Co-Lead Telecom November 13, 2012 DRAFT Discussion Overview Purpose: This HSS Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized leadership and oversight by

  13. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary - Strategic Initiatives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Initiatives Work Group Co-Lead Telecom November 13, 2012 DRAFT Discussion Overview Purpose: This HSS Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized leadership and oversight by

  14. U.S.-Vietnam Climate Change Working Group | Open Energy Information

    Open Energy Info (EERE)

    -Vietnam Climate Change Working Group Jump to: navigation, search Name U.S.-Vietnam Climate Change Working Group AgencyCompany Organization United States Geological Survey,...

  15. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  16. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Environmental Management (EM)

    ... ideas, consider safe solutions to problems, and use the collective experience ... hazmat security plans; and emergency response planning as required in 49 CFR 173. There ...

  17. Annual Energy Outlook 2013 Renewable Electricity Working Group

    Gasoline and Diesel Fuel Update (EIA)

    ... Robert Smith(ECNRA), briefed the attendees on current efforts to update the biomass supply ... Dr. Smith noted that current plans are to include this new module with AEO 2013, but ...

  18. Summary of AEO2016 Electricity Working Group Meeting held on...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... co-firing natural gas at higher --40-60%-- rates.). Compliance with Cross State Air Pollution rule (CSAPR): A participant asked if EIA planned to model scenarios for the CSAPR ...

  19. TWRS privatization phase I - site characterization and environmental baseline work plan

    SciTech Connect (OSTI)

    Reidel, S.P.; Hodges, F.N., Westinghouse Hanford

    1996-08-27

    This work plan defines the steps necessary to develop a Site Characterization Plan and Environmental Baseline for the TWRS Privatization Phase I area. The Data Quality Objectives Process will be the primary tool used to develop these plans.

  20. 10 CFR 851 Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 10 CFR 851 Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews (67.49 KB) More Documents & Publications 10 CFR 851 Work Group Status Overview - September 2012 Workforce Retention Work Group Status Overview - July 2012 Strategic Initiatives Work Group Status Overview - July 2012

  1. Proposed Agenda for High T Working Group Meeting: Paris | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Proposed Agenda for High T Working Group Meeting: Paris Proposed Agenda for High T Working Group Meeting: Paris Proposed agenda for the High Temperature Membrane Working Group Meeting held in Arlington, Virginia, Thursday, May 26,2005. htmwg05_agenda.pdf (12.88 KB) More Documents & Publications Agenda: High Temperature Membrane Working Group Meeting Agenda for the High Temperature Membrane Working Group Meeting Model Compound Studies of Fuel Cell Membrane Degradation

  2. DOE Durability Working Group June 2010 Kick-Off Meeting Minutes |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 0 Kick-Off Meeting Minutes DOE Durability Working Group June 2010 Kick-Off Meeting Minutes Minutes from Durability Working Group June 2010 Kick-off meeting sponsored by DOE Fuel Cell Technologies Program. durability_working_group_minutes_june_2010.pdf (33.66 KB) More Documents & Publications DOE Durability Working Group February 2013 Meeting Agenda Advanced Cathode Catalysts DOE Durability Working Group June 2014

  3. DOE Durability Working Group May 2011 Meeting Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 2011 Meeting Agenda DOE Durability Working Group May 2011 Meeting Agenda Meeting agenda from the Spring 2011 Durability Working Group Meeting sponsored by the U.S. Department of Energy (DOE) Fuel Cell Technologies Program. durability_working_group_agenda_may_2011.pdf (24.2 KB) More Documents & Publications DOE Durability Working Group October 2010 Meeting Minutes DOE Durability Working Group October 2011 Meeting Notes

  4. State and Tribal Government Working Group Visits the Weldon Spring Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site June 1, 2011 - 3:18pm Addthis State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site State and Tribal Government Working Group Visits the Weldon Spring Site What does this project do? Goal 1. Protect human health and the

  5. Interim measure work plan/design for Agra, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  6. LEDSGP/about/working-groups | Open Energy Information

    Open Energy Info (EERE)

    and Process Training for Research Leads Subnational Integration of LEDS Climate Resilience Integration to LEDS Work Stream-Analysis and Tools Development Impacts Assessment...

  7. TRANSPORTATION WORKING GROUP (TWG) MEETING Clark County Government...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Works Tim Murphy, NDEP Irene Navis, Clark County Office of Emergency ManagementYucca Mountain Oversight Scott Page, NDEP Gene Pasinski, Clark County Russ Peacock, White Pine ...

  8. PNNL Technology Planning and Deployment Group | Open Energy Informatio...

    Open Energy Info (EERE)

    decisions Life-Cycle Analysis - energy costs and consumption, economic options and new technology impacts Marketing Definition, outreach plans and materials Next generation...

  9. The SM and NLO Multileg Working Group: Summary Report

    SciTech Connect (OSTI)

    Andersen, J.R.; Archibald, J.; Badger, S.; Ball, R.D.; Bevilacqua, G.; Bierenbaum, I.; Binoth, T.; Boudjema, F.; Boughezal, R.; Bredenstein, A.; Britto, R.; Campanelli, M.; Campbell, J.; Carminati, L.; Chachamis, G.; Ciulli, V.; Cullen, G.; Czakon, M.; Del Debbio, L.; Denner, A.; Dissertori, G.; /Edinburgh U. /Zurich, ETH /Michigan State U. /CAFPE, Granada /CERN /Durham U., IPPP /DESY, Zeuthen /Democritos Nucl. Res. Ctr. /Valencia U., IFIC /Annecy, LAPTH /Zurich U. /KEK, Tsukuba /Saclay, SPhT /University Coll. London /Fermilab /INFN, Milan /Milan U. /PSI, Villigen /Florence U. /INFN, Florence /RWTH Aachen U.

    2012-04-10

    After years of waiting, and after six Les Houches workshops, the era of LHC running is finally upon us, albeit at a lower initial center-of-mass energy than originally planned. Thus, there has been a great sense of anticipation from both the experimental and theoretical communities. The last two years, in particular, have seen great productivity in the area of multi-parton calculations at leading order (LO), next-to-leading order (NLO) and next-to-next-to-leading order (NNLO), and this productivity is reflected in the proceedings of the NLM group. Both religions, Feynmanians and Unitarians, as well as agnostic experimenters, were well-represented in both the discussions at Les Houches, and in the contributions to the write-up. Next-to-leading order (NLO) is the first order at which the normalization, and in some cases the shape, of perturbative cross sections can be considered reliable. This can be especially true when probing extreme kinematic regions, as for example with boosted Higgs searches considered in several of the contributions to this writeup. A full understanding for both standard model and beyond the standard model physics at the LHC requires the development of fast, reliable programs for the calculation of multi-parton final states at NLO. There have been many advances in the development of NLO techniques, standardization and automation for such processes and this is reflected in the contributions to the first section of this writeup. Many calculations have previously been performed with the aid of semi-numerical techniques. Such techniques, although retaining the desired accuracy, lead to codes which are slow to run. Advances in the calculation of compact analytic expressions for Higgs + 2 jets have resulted in the development of much faster codes, which extend the phenomenology that can be conducted, as well as making the code available to the public for the first time. A prioritized list of NLO cross sections was assembled at Les Houches in 2005

  10. Historical Information on the Transportation External Coordination Working Group (TEC)

    Broader source: Energy.gov [DOE]

    TEC was formed in 1992 to improve coordination between the U.S. Department of Energy (DOE) and external groups interested in the Department's transportation activities. TEC was co-chaired by DOE's...

  11. The QCD/SM working group: Summary report

    SciTech Connect (OSTI)

    W. Giele et al.

    2004-01-12

    Quantum Chromo-Dynamics (QCD), and more generally the physics of the Standard Model (SM), enter in many ways in high energy processes at TeV Colliders, and especially in hadron colliders (the Tevatron at Fermilab and the forthcoming LHC at CERN), First of all, at hadron colliders, QCD controls the parton luminosity, which rules the production rates of any particle or system with large invariant mass and/or large transverse momentum. Accurate predictions for any signal of possible ''New Physics'' sought at hadron colliders, as well as the corresponding backgrounds, require an improvement in the control of uncertainties on the determination of PDF and of the propagation of these uncertainties in the predictions. Furthermore, to fully exploit these new types of PDF with uncertainties, uniform tools (computer interfaces, standardization of the PDF evolution codes used by the various groups fitting PDF's) need to be proposed and developed. The dynamics of colour also affects, both in normalization and shape, various observables of the signals of any possible ''New Physics'' sought at the TeV scale, such as, e.g. the production rate, or the distributions in transverse momentum of the Higgs boson. Last, but not least, QCD governs many backgrounds to the searches for this ''New Physics''. Large and important QCD corrections may come from extra hard parton emission (and the corresponding virtual corrections), involving multi-leg and/or multi-loop amplitudes. This requires complex higher order calculations, and new methods have to be designed to compute the required multi-legs and/or multi-loop corrections in a tractable form. In the case of semi-inclusive observables, logarithmically enhanced contributions coming from multiple soft and collinear gluon emission require sophisticated QCD resummation techniques. Resummation is a catch-all name for efforts to extend the predictive power of QCD by summing the large logarithmic corrections to all orders in perturbation theory. In

  12. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  13. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect (OSTI)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  14. Technical Work Plan For: Meteorological Monitoring Data Analysis

    SciTech Connect (OSTI)

    R. Green

    2006-02-06

    The meteorological monitoring and analysis program has five objectives. (1) Acquire qualified meteorological data from YMP meteorological monitoring network using appropriate controls on measuring and test equipment. Because this activity is monitoring (i.e., recording naturally occurring events) pre-test predictions are not applicable. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The meteorological monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. (2) Process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. (3) Develop analyses or calculations to provide information to data requesters and provide data sets as requested. (4) Provide precipitation amounts to Site Operations to support requirements to perform inspections in the Stormwater Pollution Prevention Plan (implemented in LP-OM-050Q-BSC) following storm events of greater than 0.5 inches. The program also provides meteorological data during extreme weather conditions (e.g., high winds, rainstorms, etc.) to support decisions regarding worker safety. (5) Collect samples of precipitation for chemical and isotopic analysis by the United States Geological Survey (USGS). The BSC ES&H Environmental Compliance organization is responsible for performing this work. Data from calendar-year periods are submitted to the TDMS to provide YMP users with qualified meteorological data for scientific modeling and analyses, engineering designs of surface facilities, performance assessment analyses, and operational safety issues.

  15. 2014-06-09 Issuance: Regional Standards Enforcement Working Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document is being made available through he Internet solely as a means to facilitate the public's access to this document. 2014-06-09 Regional Standards Enforcement Working ...

  16. Final work plan for targeted investigation at Hilton, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  17. Working group meeting on heavy vehicle aerodynamic drag: presentations and summary of comments and conclusion

    SciTech Connect (OSTI)

    Browand, F; Gutierrez, W; Leonard, A; McBride, D; McCallen, R; Ross, J; Roth, K; Rutledge, W; Salari, K

    1998-09-28

    The first Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at Sandia National Laboratories (SNL) in Albuquerque, New Mexico on August 28, 1998. The purpose of the meeting was to review the proposed Multi-Year Program Plan (MYPP) and provide an update on the Group"s progress. In addition, the technical details of each organization"s activities were presented and discussed. Presentations were given by representatives from the Department of Energy (DOE) Office of Transportation Technology Office of Heavy Vehicle Technology (OHVT), Lawrence Livermore National Laboratory (LLNL), SNL, University of Southern California (USC), California Institute of Technology (Caltech), and NASA Ames Research Center. These presenters are part of a DOE appointed Technical Team assigned to developing the MYPP. The goal of the MYPP is to develop and demonstrate the ability to simulate and analyze aerodynamic flow around heavy truck vehicles using existing and advanced computational tools (A Multi-Year Program Plan for the Aerodynamic Design of Heavy Vehicles, R. McCallen, D. McBride, W. Rutledge, F. Browand, A. Leonard, .I. Ross, UCRL-PROP- 127753 Dr. Rev 2, May 1998). This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions from the Meeting participants, and outlines the future actions.

  18. WLCG and IPv6 - The HEPiX IPv6 working group

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Campana, S.; K. Chadwick; Chen, G.; Chudoba, J.; Clarke, P.; Elias, M.; Elwell, A.; Fayer, S.; Finnern, T.; Goossens, L.; et al

    2014-01-01

    The HEPiX (http://www.hepix.org) IPv6 Working Group has been investigating the many issues which feed into the decision on the timetable for the use of IPv6 (http://www.ietf.org/rfc/rfc2460.txt) networking protocols in High Energy Physics (HEP) Computing, in particular in the Worldwide Large Hadron Collider (LHC) Computing Grid (WLCG). RIPE NCC, the European Regional Internet Registry (RIR), ran out ofIPv4 addresses in September 2012. The North and South America RIRs are expected to run out soon. In recent months it has become more clear that some WLCG sites, including CERN, are running short of IPv4 address space, now without the possibility of applyingmore » for more. This has increased the urgency for the switch-on of dual-stack IPv4/IPv6 on all outward facing WLCG services to allow for the eventual support of IPv6-only clients. The activities of the group include the analysis and testing of the readiness for IPv6 and the performance of many required components, including the applications, middleware, management and monitoring tools essential for HEP computing. Many WLCG Tier 1/2 sites are participants in the group's distributed IPv6 testbed and the major LHC experiment collaborations are engaged in the testing. We are constructing a group web/wiki which will contain useful information on the IPv6 readiness of the various software components and a knowledge base (http://hepix-ipv6.web.cern.ch/knowledge-base). Furthermore, this paper describes the work done by the working group and its future plans.« less

  19. Spent Fuel Working Group report on inventory and storage of the Department`s spent nuclear fuel and other reactor irradiated nuclear materials and their environmental, safety and health vulnerabilities. Volume 2, Working Group Assessment Team reports; Vulnerability development forms; Working group documents

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Secretary of Energy`s memorandum of August 19, 1993, established an initiative for a Department-wide assessment of the vulnerabilities of stored spent nuclear fuel and other reactor irradiated nuclear materials. A Project Plan to accomplish this study was issued on September 20, 1993 by US Department of Energy, Office of Environment, Health and Safety (EH) which established responsibilities for personnel essential to the study. The DOE Spent Fuel Working Group, which was formed for this purpose and produced the Project Plan, will manage the assessment and produce a report for the Secretary by November 20, 1993. This report was prepared by the Working Group Assessment Team assigned to the Hanford Site facilities. Results contained in this report will be reviewed, along with similar reports from all other selected DOE storage sites, by a working group review panel which will assemble the final summary report to the Secretary on spent nuclear fuel storage inventory and vulnerability.

  20. [Draft minutes of IAPG Mechanical Working Group meeting

    SciTech Connect (OSTI)

    Skinner, D.M.

    1993-12-15

    This report provides the draft minutes of the Interagency Advanced Power Group meeting held November 3--4, 1993. Topics addressed are: Materials for thermal management; photovoltaic programs in the Airforce; ground based radar advanced power system development program; battery research; generator prognostics & diagnostics equipment; a thermal flight experiment test program; power systems assessment; Overview: Phillip`s space thermal technologies branch; and development of actuator thermal management.