Powered by Deep Web Technologies
Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Research Highlights Sorted by Submission Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

2

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

award of the (Date) ENERGY STAR: Plant name Plant street address Plant city, state, zip code As documented by the attached Statement of Energy Performance, I affirm that the...

3

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

4

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

5

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

6

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

7

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

8

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

9

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

10

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

11

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

12

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

13

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

14

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

15

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

16

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

17

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

18

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

19

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

20

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Research Highlights Sorted by Submission Data  

NLE Websites -- All DOE Office Websites (Extended Search)

HighlightsSort HighlightsSort Form Submit a New Research Highlight Sort Highlights Submitter Title Research Area Working Group Submission Date DOE Progress Reports Notable Research Findings for 2001-2006 Biological and Environmental Research Abstracts Database Research Highlights Summaries Research Highlights sorted by Submission Data "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J.

22

Inside RHIC | Submission Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Guidelines Submission Guidelines "Inside RHIC" is an online publication covering news and views of the RHIC and AGS program at Brookhaven National Laboratory at the level of engineers and students. The RHIC AGS Users Group is sponsoring this effort, and we have tried to cover the breadth of the efforts at RHIC, from physics results to machine and detector development. The articles are relatively short and not so technical; a few hundred words are enough. It is a web publication, so length is not critical, but it is better to be concise. If you write an article for RHIC News, here's what is needed: The text of the article (a plain ASCII text file is adequate, even preferable, although we can deal with almost any format) The first few sentences (maybe 100 words) should summarize the point

23

PUBLIC SUBMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6.html[2/3/2012 12:44:00 PM] 6.html[2/3/2012 12:44:00 PM] PUBLIC SUBMISSION As of: February 03, 2012 Received: January 19, 2012 Status: Pending_Post Tracking No. 80f9b24f Comments Due: January 20, 2012 Submission Type: Web Docket: DOE-HQ-2012-0004 U.S. Department of Energy Audit Guidance: For-Profit Recipients Comment On: DOE-HQ-2012-0004-0001 Audit Guidance: For-Profit Recipients Document: DOE-HQ-2012-0004-DRAFT-0006 Comment on FR Doc # 2011-32622 Submitter Information Name: Eric Russell Address: 836 Thurber Drive West Apt 1 Columbus, Ohio, 43215 Email: ejrussell02@yahoo.com Phone: 615-972-9984 General Comment See attached file(s) Attachments Response to DOE For Profit Audit Federal Register Notice Response to U.S. Department of Energy Request for Information Federal Register Notice 2011-32622

24

PUBLIC SUBMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-2012%2010-10-11-600/Document%20List%2003-02-2012%2010-10-11-600_docs/Martin%20WeblerCover_DRAFT-0004.html[2/3/2012 12:40:30 PM] 2-2012%2010-10-11-600/Document%20List%2003-02-2012%2010-10-11-600_docs/Martin%20WeblerCover_DRAFT-0004.html[2/3/2012 12:40:30 PM] PUBLIC SUBMISSION As of: February 03, 2012 Received: January 05, 2012 Status: Pending_Post Tracking No. 80f8e384 Comments Due: January 20, 2012 Submission Type: Web Docket: DOE-HQ-2012-0004 U.S. Department of Energy Audit Guidance: For-Profit Recipients Comment On: DOE-HQ-2012-0004-0001 Audit Guidance: For-Profit Recipients Document: DOE-HQ-2012-0004-DRAFT-0004 Comment on FR Doc # 2011-32622 Submitter Information Name: Martin Webler Address: 866 Macarthur Dr 866 Macarthur Dr Pittsburgh, PA, 15228 General Comment In working with the "316 Audits" over the past year, I noted some general improvements in the guidance that would help clarify things for the auditor, the recipients and DOE personnel. I hope you

25

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

26

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

27

DATES: The due dates for submission of white papers are ...  

Science Conference Proceedings (OSTI)

... Oil 2010-2030 140 100 ... to increase, while nuclear and natural gas use will ... 2030, billion kilowatt hours (EIA Annual Energy Outlook, Early Release ...

2011-08-02T23:59:59.000Z

28

PAPERWORK REDUCTION ACT SUBMISSION  

U.S. Energy Information Administration (EIA)

19. Certification for Paperwork Reduction Act Submissions On behalf of this Federal agency, I certify that the collection of information encompassed ...

29

2013 Allocation Request Submissions Due September 28  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Allocation Request Submissions Due September 28 2013 Allocation Request Submissions Due September 28 August 1, 2012 by Francesca Verdier (0 Comments) The deadline for submissions...

30

National Bridge Inventory Record Data Submission Requirement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement 2011.09.02 OECM-NBI Record Data Submission Req.pdf More...

31

Science Brief Submission Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Brief Submission Form Science Brief Submission Form Science Brief Submission Form Print Tuesday, 01 May 2007 00:00 Science Brief Guidelines and Submission Form Please fill out the form below to submit a Science Brief and send ONE image (may be a composite of up to four images) from your publication directly to us at alscommunications@lbl.gov. Please note: The image must be high resolution, and, if there is text on the image, it must be scalable. We will let you know as soon as it is posted! * Required Your Name * Your Email Address * Your Affiliation Title of Publication * Link to Publication (if available) Beamline(s) * Journal Citation * Description of Research * 200 word maximum Image Caption * 50 word maximum Submit Never submit passwords through Google Forms. Powered by Google Docs Report Abuse - Terms of Service - Additional Terms

32

SSRL28 Abstract Submission  

NLE Websites -- All DOE Office Websites (Extended Search)

Visitor Info Visitor Info General Info Need more information? Contact: Cathy Knotts Manager, URA SSRL, MS 99 2575 Sand Hill Road Menlo Park, CA 94025 28th Annual Stanford Synchrotron Radiation Laboratory Users' Meeting Menlo Park, California USA October 17-19, 2001 Oral Abstract Submissions - Due August 24 Poster Abstract Submissions - Due September 28 Users are invited to submit abstracts highlighting research activities conducted over the past year at SSRL for poster presentations at the Users' Meeting. Please use the abstract submission form via the web. POSTER SESSION Posters will be displayed throughout the meeting and will be highlighted during a poster session and reception on Thursday, October 19. The poster session will be located just steps away from the main auditorium and the vendor display area. Users presenting posters must also register for the Users' Meeting.

33

Supply Chain - Submissions | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Submissions Sustainable Supply Chains Submissions Let's Talk About Sustainable Supply Chain You are here Data.gov Communities Sustainable Supply Chain Sustainable Supply...

34

Issue Date: Expiration Date:  

E-Print Network (OSTI)

Discussion: Enclosed for your review and comment are the draft revisions to the FSME Procedure SA-103, Reviewing the Common Indicator, Technical Staffing and Training. SA-103 procedure describes the process and guidelines to be used by IMPEP team members when reviewing the adequacy of an NRC Region or State’s program for the staffing and training of technical personnel. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Training; Robert J. Lewis; Robert J. Lewis; A. Duncan White

2009-01-01T23:59:59.000Z

35

Optimization Online - Stochastic Programming Submissions - 2013  

E-Print Network (OSTI)

Stochastic Programming Submissions - 2013. January 2013. Generating moment matching scenarios using optimization techniques. Sanjay Mehrotra, David ...

36

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010 ...  

U.S. Energy Information Administration (EIA)

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010.01 PART 2. SUBMISSION/RESUBMISSION INFORMATION Year REPORT PERIOD: If this is a ...

37

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010 ...  

U.S. Energy Information Administration (EIA)

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010.01 PART 2. SUBMISSION/RESUBMISSION INFORMATION Year REPORT PERIOD: If this is a resubmission, enter an ...

38

Groups  

Open Energy Info (EERE)

groups/all/feed en Buildings groups/all/feed en Buildings http://en.openei.org/community/group/buildings Description: This group is dedicated to discussions about green buildings, energy use in buildings, occupant comfort in buildings, and building technologies. The OpenEI Buildings Community Group will be dedicated to discussions, blogs, and postings about new building technologies, green buildings, energy use in buildings, and occupant experience (comfort levels) in green buildings.group/buildings" target="_blank">read more architecture building reviews buildings technology comfort energy use facilities management green building LEED technologies usgbc

39

Optimization Online - All Areas Submissions - October 2013  

E-Print Network (OSTI)

All Areas Submissions - October 2013. Network Optimization Optimization Models for Differentiating Quality of Service Levels in Probabilistic Network Capacity ...

40

Optimization Online - Robust Optimization Submissions - 2013  

E-Print Network (OSTI)

Robust Optimization Submissions - 2013. January 2013. Robust Least Square Semidefinite Programming with Applications to Correlation Stress Testing

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Optimization Online - Integer Programming Submissions - 2013  

E-Print Network (OSTI)

Integer Programming Submissions - 2013. January 2013. (Mixed) Integer Linear Programming On the Augmented Lagrangian Dual for Integer Programming

42

VIA ELECTRONIC SUBMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 MacDougal Street, Third Floor * New York, New York 10012 * (212) 992-8932 * www.policyintegrity.org 39 MacDougal Street, Third Floor * New York, New York 10012 * (212) 992-8932 * www.policyintegrity.org March 21, 2011 VIA ELECTRONIC SUBMISSION Office of the General Counsel US Department of Energy Washington, DC Attention: Regulatory Burden RFI - Docket No. DOE-HQ-2011-0014-0001 Subject: Response to Request for Information on "Reducing Regulatory Burden," 76 Fed. Reg. 6123 (Feb. 3, 2011) The Institute for Policy Integrity at New York University School of Law submits the following comments to the Department of Energy ("DOE") in response to its request for comments on the formulation of a preliminary plan for retrospective analysis as required by Executive Order 13,563.

43

Publication Submission Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Pages Pages publicationsubmission Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES LCLS : Linac Coherent Light Source An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar LCLS Lasers Expand Lasers LCLS Quick Launch Home About LCLS Expand About LCLS LCLS News Expand LCLS News User Resources Expand User Resources Instruments Expand Instruments Proposals Publications Expand Publications Schedules Machine Status Machine FAQs Safety Organization Expand Organization Directories Expand Directories Staff Resources Contact Us All Site Content Department of Energy Page Content Publication Submission Form Th Tell LCLS about new publications Please submit this form to notify LCLS about new publications relating to

44

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

45

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

46

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Science Undergraduate Laboratory Internships (SULI) SULI Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. SULI Internship Term: Spring 2014 Summer 2014* Fall 2013 On-line Application Opens August 6, 2013 October 18, 2013 May 1, 2013 Applications Due October, 1, 2013 5:00 PM ET January 10, 2014 5:00 PM ET June 12, 2013 5:00 PM ET Offer Notification Period Begins on or around October, 15, 2013 January 20, 2014 June 24, 2013

47

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2014 On-line Application Opens October 18, 2013 Applications Due January 10, 2014 5:00 PM ET* Offer Notification Period Begins January 20, 2014 All DOE Offers and Notifications Complete April 1, 2014 *A research proposal co-developed with a DOE laboratory researcher must be electronically submitted by all faculty applicants as part of their

48

DOE Extends Deadline for Submission of Smart Grid RFI Reply Comments |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deadline for Submission of Smart Grid RFI Reply Deadline for Submission of Smart Grid RFI Reply Comments DOE Extends Deadline for Submission of Smart Grid RFI Reply Comments July 16, 2010 - 3:20pm Addthis Due to an unexpectedly large public response, the Department of Energy will extend by two weeks the deadline for submission of reply comments in response to its two Smart Grid RFIs. Originally set at July 26, the new deadline will be August 9, 2010. The Department's Smart Grid RFIs (both released in May 2010) were intended to inform the Department as it develops policies regarding the integration of broadband technologies with the Smart Grid. The first RFI solicited comments from electric utilities, consumer groups, and other stakeholders on ongoing federal, state, and private efforts to use or allow

49

The only official copy is on-line at the SHSD IH Group website. Before using a printed copy, verify that it is current by checking the document issue date on the website.  

E-Print Network (OSTI)

on the website. NUMBER HP74900 BROOKHAVEN NATIONAL LABORATORY Safety & Health Services Division Standard Safety & Health Services Division Standard Operating Procedure REVISION FINAL Rev1 DATE 07/07/10 SUBJECT Industrial Hygiene Group, Safety & Health Services Representatives and other organizations can perform tasks

Homes, Christopher C.

50

Microsoft Word - Flash_09-04_Submission_requirements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 1 4 1 June 26, 2009 DATE: June 12, 2009 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PMCDP CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Program Certification Process Requirement Change One June 12, 2009, the Certification Review Board (CRB) identified new requirements regarding timely submission of certification packages for CRB approval. Effective immediately, in order for Level 1 and 2 packages to be eligible for certification action at the next scheduled Board meeting, packages must successfully pass the independent review and OCEM approval phases no later than two weeks prior to that upcoming Board meeting. It is strongly recommended Level 1 and 2 packages ready for CRB consideration be submitted to

51

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

52

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

53

Structure validation in the submission, review and  

E-Print Network (OSTI)

­ Release of powder CIF dictionary (ver. 1.0) · 1998 ­ Automated submission by email ­ use of the VRF

Magee, Joseph W.

54

EDRA / Places Awards -- Call for Submissions  

E-Print Network (OSTI)

Submissions 2001 edra / Places Awards Jury Allan B. Jacobsannounce our fourth annual awards for Place Design, Planningsociology and psychology. Awards will be presented in July,

2001-01-01T23:59:59.000Z

55

Optimization Online - All Areas Submissions - August 2012  

E-Print Network (OSTI)

All Areas Submissions - August 2012. Convex and ... Dual-level scenario trees - Scenario generation and applications in energy planning. Michal Kaut, Kjetil T.

56

Optimization Online - All Areas Submissions - December 2012  

E-Print Network (OSTI)

All Areas Submissions - December 2012. Linear, Cone and ... Solving the integrated airline recovery problem using column-and-row generation. Stephen J  ...

57

Optimization Online - All Areas Submissions - June 2012  

E-Print Network (OSTI)

All Areas Submissions - June 2012. Convex and ... A new warmstarting strategy for the primal-dual column generation method. Jacek Gondzio, Pablo González-  ...

58

Optimization Online - Search or Browse Submissions  

E-Print Network (OSTI)

Search or Browse Optimization Online Submissions. Advanced Search using Our Search Engine. Enter your search terms: name of author(s), title, keywords, ...

59

Optimization Online - All Areas Submissions - May 2013  

E-Print Network (OSTI)

All Areas Submissions - May 2013. Convex and Nonsmooth Optimization About uniform regularity of collections of sets. Alexander Y. Kruger, Nguyen H. Thao.

60

Optimization Online - All Areas Submissions - June 2013  

E-Print Network (OSTI)

All Areas Submissions - June 2013. Nonlinear Optimization A Riemannian symmetric rank-one trust-region method. Wen Huang, P.-A. Absil, K. A. Gallivan.

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

2013-10-17: State Laboratory Annual Submission Process  

Science Conference Proceedings (OSTI)

State Laboratory Annual Submission Process. Purpose: For State Laboratory weights and measures staff to review annual ...

2013-10-21T23:59:59.000Z

62

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

63

ARM - Data Product Registration and Submission  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationData Product Registration and Submission DocumentationData Product Registration and Submission Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Data Product Registration and Submission The procedure for principal investigators to submit ARM science research products, field campaign data, or DOE-supported research data to the ARM Data Archive is the following: To begin, use the Data Product Registration and Submission form. Identify yourself-either from the pick list or by manual entry.

64

Project Submission Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

International Cooperation International Cooperation Project Title: Country/Organizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: Work Completed to Date: Overview of Proposed Scope for FY12: Summary Brief Description of Specific Project(s): Timeline: Estimated Cost: Status: CONTINUATION or NEW? Type of Contracting Instrument: (Int'l agreements, lab-lab agreement, etc) Participant Organizations General Scope Budget Foreign (Technical Scope) US (Overhead rate) (Technical Scope) TOTAL Budget Breakdown: Overhead rates and experimental work: APPROVE ____________________ DISAPPROVE ____________________ Approving Official: Associate PDAS, Alice Williams, EM-2.1

65

Enhanced Career Longevity and Retirement Options for DOE Protective Force Personnel - Recommendations from the Protective Force Career Options Initiative Study Group dated June 30, 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 ENHANCED CAREER LONGEVITY AND RETIREMENT OPTIONS FOR DOE PROTECTIVE FORCE PERSONNEL Recommendations from the Protective Force Career Options Initiative Study Group EXECUTIVE SUMMARY On March 31, 2009, the Office of Health, Safety and Security (HSS), the National Nuclear Security Administration (NNSA), the Office of Environmental Management, the Office of Nuclear Energy, the Office of Fossil Energy, and the National Council of Security Police (NCSP) came together in a joint effort to examine "realistic and reasonable options for improving the career opportunities and retirement prospects of protective force (PF) members while maintaining, within current and anticipated budgetary constraints, a robust and effective security posture."

66

ADVANTAGES OF THE PROGRAM-BASED LOGBOOK SUBMISSION GUI AT JEFFERSON LAB  

Science Conference Proceedings (OSTI)

DTlite is a Tcl/Tk script that is used as the primary interface for making entries into Jefferson Lab's electronic logbooks. DTlite was originally written and implemented by a user to simplify submission of entries into Jefferson Lab?s electronic logbook, but has subsequently been maintained and developed by the controls software group. The use of a separate, script-based tool for logbook submissions (as opposed to a web-based submission tool bundled with the logbook database/interface) provides many advantages to the users, as well as creating many challenges to the programmers and maintainers of the electronic logbook system. The paper describes the advantages and challenges of this design model and how they have affected the development lifecycle of the electronic logbook system.

T. McGuckin

2006-10-24T23:59:59.000Z

67

BUDGET KEY DATES  

Science Conference Proceedings (OSTI)

BUDGET KEY DATES. For Immediate Release: December 15, 2009. Contact: Diane Belford 301-975-8400. Budget Key Dates.

2013-06-16T23:59:59.000Z

68

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

69

EMS: Group: Date: REVISED 04/09  

E-Print Network (OSTI)

to accurately record beginning and ending mileage, failure to attach gas receipt / fill gas tank, failure ____________________________________ Calculated Charges Basic Rental Fee = $12.25 Mileage: ___________ -25 = __________ X $0

Carter, John

70

arXiv.org help - Submission Version Availability  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Version Availability Beginning in October 1997, all official versions of papers submitted are made publicly available through the archive Web interface. An "official"...

71

EDRA / Places Awards -- Sixth Annual Call for Submissions  

E-Print Network (OSTI)

Sixth Annual EDRA/Places Awards Submissions are accepted insixth annual EDRA/Places Awards for Place Design, Planningor related discipline. Awards will be presented in May,

2002-01-01T23:59:59.000Z

72

Guide for the Submission of Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

GUIDE FOR THE SUBMISSION OF GUIDE FOR THE SUBMISSION OF UNSOLICITED PROPOSALS The National Energy Technology Laboratory (NETL), Pittsburgh Office has operational responsibility of the DOE Unsolicited Proposal (USP) Program. All unsolicited proposals should be forwarded by Email to John N. Augustine at DOEUSP@NETL.DOE.GOV who will serve as the single point of contact for all Department of Energy (DOE) unsolicited proposals. Please direct all unsolicited proposals, abstracts and correspondence to: John N. Augustine, Mail Stop 921-107 Unsolicited Proposal Manager U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Email: DOEUSP@NETL.DOE.GOV -1- TABLE OF CONTENTS Page Introduction .................................................................................................................................... 3

73

Requirements and Submission Process for Qualified Software  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements and Submission Process for Qualified Software The U.S. Department of Energy (DOE) verifies and maintains the list of software that qualifies for the calculation of the energy and power cost savings for commercial building tax deductions under tax code Section 179D. The software requirements are listed under Internal Revenue Service (IRS) Code §179D (c)(1) and (d) Regulations, Notice 2006-52

74

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

75

BABAR Web job submission with Globus Authentication and AFS Access  

Science Conference Proceedings (OSTI)

We present two versions of a grid job submission system produced for the BaBar experiment. Both use globus job submission to process data spread across various sites, producing output which can be combined for analysis. The problems encountered with authorization and authentication, data location, job submission, and the input and output sandboxes are described, as are the solutions. The total system is still some way short of the aims of enterprises such as the EDG, but represent a significant step along the way.

Forti, Alessandra

2003-06-17T23:59:59.000Z

76

Copenhagen Accord NAMA Submissions Implications for the Transport Sector |  

Open Energy Info (EERE)

Copenhagen Accord NAMA Submissions Implications for the Transport Sector Copenhagen Accord NAMA Submissions Implications for the Transport Sector Jump to: navigation, search Tool Summary Name: Bridging the Gap: Copenhagen Accord NAMA Submissions Agency/Company /Organization: GTZ, Institute for Transportation and Development Policy (ITDP), Transport Research Laboratory(TRL), International Association for Public Transport (UITP), Veolia Transport Sector: Energy Focus Area: Transportation Topics: Low emission development planning Resource Type: Case studies/examples Website: www.transport2012.org/bridging/ressources/files/1/586,NAMA-submissions Country: Armenia, Botswana, Costa Rica, Democratic Republic of Congo, Ethiopia, Indonesia, Jordan, Republic of Macedonia, Madagascar, Marshall Islands, Mexico, Mongolia, Morocco, Papua New Guinea, Sierra Leone, Singapore

77

Notice of OMB Action Approving DOE Submission to Extend Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OMB Action Approving DOE Submission to Extend Information OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for three years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Supporting documentation for the request was submitted in September and October, 2011. Comments were due on or before November 7, 2011. ICR Supporting Statement (PDF). OMB Form 83-I (PDF). SGIG Reporting Guidance

78

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

79

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

80

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Release Date: August 2010 Next Release Date: August 2011  

U.S. Energy Information Administration (EIA)

Release Date: August 2010 Next Release Date: August 2011 U.S. Energy Information Administration/Renewable Energy Annual 2008 Table 1.14 Total Biomass Electricity Net ...

82

DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe...

83

O:\\A76\\FAIR\\Fair Act 2008\\Guidance\\PDF\\GUIDE TO INVENTORY SUBMISSION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O:A76FAIRFair Act 2008GuidancePDFGUIDE TO INVENTORY SUBMISSION ATTCH 2.pdf.prn.pdf&0; O:A76FAIRFair Act 2008GuidancePDFGUIDE TO INVENTORY SUBMISSION ATTCH...

84

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

85

Date: _______________ Vendor Name: _______________________________  

E-Print Network (OSTI)

: ________________________ City, State, Zip:_______________________ Phone # : __________________ Fax, Nuclear Magnetic Resonance e. ___ Fire Safety-Extinguishing Systems, Bldg. Security Alarm Systems on ReX Released Re-released Faxed to Purchasing Date Initials 6-15-11 REV 0.00 0.00 0.00 0.00 0.00 0

Fabrikant, Sara Irina

86

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

87

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

88

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

89

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

90

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

91

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

92

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

93

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

94

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

95

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

96

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

97

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

98

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

99

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

100

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

102

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

103

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

104

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

105

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

106

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

107

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

108

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

109

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

110

From: Messaging Anti-Abuse Working Group (MAAWG) Date ...  

Science Conference Proceedings (OSTI)

... He's not a pharmacist. ... should consider offering a voluntary pilot program whereby ... Many federal research and development projects are fairly ...

2010-10-04T23:59:59.000Z

111

Radiocarbon dating, memories, and hopes  

SciTech Connect

The history of radiocarbon dating from 1939 to the present is reviewed. The basic principles of radiocarbon dating are that cosmic rays make living things radioactive with {sup 14}C to a certain level fixed by the environment and that at death the intake of food stops so no replenishment of the {sup 14}C steadily lost by the immutable decay occurs. Therefore measurement of the degree of decay gives the time lapse since death, i.e., the radiocarbon age. The equipment developed and experiments performed to measure the specific activity of specimens to be dated are described. The results obtained by world-wide experimenters are discussed. These showed that on simultaneity radiocarbon dating is apparently reliable but that absolute dates may be incorrect by as much as 600 to 700 y. The value of radiocarbon dating to archaeologists, geologists, climatologists, and historians is stressed. (LCL)

Libby, W.F.

1972-01-01T23:59:59.000Z

112

Dates Fact Sheet.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

crossing. This enhances an asset owner's situational awareness capability beyond simple event detection and log management. The DATES monitoring platform uses multiple algorithms...

113

Next Release Date: September 2012  

Annual Energy Outlook 2012 (EIA)

October 2010 DOEEIA-0121 (201002Q) Next Release Date: September 2012 Revised: July 2012 Quarterly Coal Report April - June 2010 October 2010 U.S. Energy Information...

114

Speed Dating Listing Company Name  

E-Print Network (OSTI)

. TerranearPMC The Ross Group Construction Corp. The Trevino Group, Inc. Victor Corporation Vigil Contracting

115

Submission Number: 60 Date Received: 12/4/2010 Submission to the Inquiry into School Libraries and Teacher Librarians in Australian Schools Terms of Reference From the  

E-Print Network (OSTI)

To inquire into and report on the role, adequacy and resourcing of school libraries and teacher librarians in Australia’s public and private schools. Specifically, the committee should focus on: 1. the impact of recent policies and investments on school libraries and their activities; 2. the future potential of school libraries and librarians to contribute to improved educational and community outcomes, especially literacy; 3. the factors influencing recruitment and development of school librarians; 4. the role of different levels of government and local communities and other institutions in partnering with and supporting school librarians; and 5. the impact and potential of digital technologies to enhance and support the roles of school libraries and librarians. 1. The impact of recent policies and investments on school libraries and their activities. School librarians are an essential partner in supporting literacy, information literacy and learning for children and school libraries integrate literacy and information skills into the

unknown authors

2010-01-01T23:59:59.000Z

116

Property:Achievement Date | Open Energy Information  

Open Energy Info (EERE)

Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&oldid...

117

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

118

104th Dates to Remember  

Science Conference Proceedings (OSTI)

Questions? Contact Connie Hilson, AOCS Exhibits Specialist, by email: connieh@aocs.org or by phone: +1 217-639-4831. Dates to Remember * January 7, 201/span>3 Online registration opens January 15, 201/span>3 Exhibitor presentations: Deadl

119

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

120

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

122

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

123

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

124

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

125

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

126

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

127

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

128

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

129

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

130

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

131

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

132

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

133

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

134

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

135

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

136

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

137

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

138

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

139

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

140

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

142

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

143

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

144

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

145

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

146

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

147

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

148

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

149

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

150

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

151

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

152

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

153

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

154

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and...

155

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

covers competitions. Word versions of the four templates will be available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

156

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

157

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the fourteen aforementioned RFP Section L and M templates are available in STRIPES as part of the series of DOE-L-1024 or DOE-M-1005 clauses. This Flash will be...

158

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the three aforementioned RFP Section H and L templates are available in STRIPES. This Flash will be available online within a day, at the following website: http:...

159

Dates:  

NLE Websites -- All DOE Office Websites (Extended Search)

of the determinants of fire behavior though studying inputs (weather, slope, fuels, and fuel moisture); learn how to interpret fire behavior outputs; documentation processes; &...

160

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed without further CRM office involvement. Generating and Managing Waste - Industrial waste in the form of general construction debris such as waste concrete, scrap...

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

owners rely on and hold contracts with Western for access to affordable and reliable bulk power supply from the Pick Sloan hydro electric system and transmission service from the...

162

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Managing Waste: Wooden material wastes would be generated from dimension lumber, plywood and particle board. No regulated wastes (e.g. chemicals, asbestos) are anticipated to...

163

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background Purpose &...

164

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

existing technologies to advance weld quality monitoring and closed loop feedback for welding systems and techniques typically used in the nuclear industry. 9. Stress Corrosion...

165

Date  

E-Print Network (OSTI)

This Design Manual Chapter 1620 Supplement is to revise WSDOT policy relating to the selection of impact attenuator systems. If you maintain a printed manual, please remove the current Chapter 1620 and replace it with the August 2011 Supplement. To get the latest information on WSDOT administrative and engineering manuals, sign up for

unknown authors

2011-01-01T23:59:59.000Z

166

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Accumulation Areas (SAAs) or a <90-day storage areas before shipping to a treatment, storage, and disposal facility (TSDF). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL...

167

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase...

168

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CERCLA Disposal Facility or at an approved off-Site facility through Waste Generator Services. 19. Work within areas Subject to Flooding - Since the well abandonment work is...

169

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPA filters. These materials will be packaged and disposed of through Waste Generation Services. 19. Work in Areas Subject to Flooding - The activities discussed are planned to...

170

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B....

171

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial...

172

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will pack, move, setup, and test the NGWTB electronic equipment. In addition, the propane tank located at CFA-666 will be relocated to CFA-661. Three propane heaters and...

173

Date  

E-Print Network (OSTI)

This thesis has been reviewed by the research advisor, research coordinator, and department chair and has been found to be satisfactory.

Clark David; Wilson Blockburger

2006-01-01T23:59:59.000Z

174

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render...

175

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

176

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

177

Dating deception: Gender, online dating, and exaggerated self-presentation  

Science Conference Proceedings (OSTI)

This study examined how differences in expectations about meeting impacted the degree of deceptive self-presentation individuals displayed within the context of dating. Participants filled out personality measures in one of four anticipated meeting conditions: ... Keywords: Gender differences, Internet, Mate selection, Personality, Self-presentation

Rosanna E. Guadagno; Bradley M. Okdie; Sara A. Kruse

2012-03-01T23:59:59.000Z

178

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

179

Controls Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Status and Schedule Safety and Training Divisions APS Engineering Support Division AES Groups Accelerator Systems Division ASD Groups X-ray Science Division XSD Groups...

180

Effective Date: MEMORANDUM OF UNDERSTANDING  

E-Print Network (OSTI)

complementary goals in aviation and future space transportation, to coordinate planning efforts, and to haveEffective Date: MEMORANDUM OF UNDERSTANDING Between DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION IN AVIATION AND SPACE TRANSPORTATION I. PURPOSE The Department of TransportatiodFederal Aviation

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

UNDERGRADUATE HANDBOOK 2011 Final Dates  

E-Print Network (OSTI)

............................................................................................................... Friday 23 September Last day for receipt of applications to enrol for 2012 through UAC without financial to be confirmed. Semester & session dates for 2012 First Semester Information Systems Head of School and Professor of Accounting FARGHER, Professor Neil L., BCom Melb MBus RMIT

182

Data Administration Area: Date Issued  

E-Print Network (OSTI)

Policy Data Administration Policy Area: Date Issued: April, 1994 Title: Data Administration Last. INTRODUCTION The President established the Committee on Data Administration (CODA) in May, 1992, to advise him on policies in the area of data administration (attached as references Policy ADC 011 and TOR for CODA

Brownstone, Rob

183

September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group Charter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Health, Safety and Security Focus Group [Name of Work Group] Work Group Charter (Date) I. PURPOSE The HSS Focus Group [Name of Work Group] is one of several HSS Work Groups, established to address worker health, safety and security programs improvements across the U.S. Department of Energy Complex. The [Name of Work Group] has been established to (state specific purpose). II. OBJECTIVES (State the desired impact(s) and major outcome(s) for, the Work Group) 1. Establish specific improvement goals, intended outputs and supporting activities that respond to identified worker health and safety improvement needs. 2. Establish measurable indicators when possible to support findings, recommendations and accomplishments.

184

Date Date Date Date Date  

E-Print Network (OSTI)

This thesis investigates the problem of regulating the temperature of a conditioned space using a Solar Assisted Air Conditioning Systems (SAACS) prototype located at Cabo Rojo, Puerto Rico. The SAACS Prototype consists of a 66 flat plate solar collector array with 115.4 m 2 of selective surface area, a 35 kW single-effect lithium-bromide absorption chiller, a 84 kW cooling tower, a 50 kW auxiliary hot water boiler, a 5700 liter storage tank equipped with flexible stratification manifolds, and a 1800 l/hr air-handling unit. A discrete-time state-space model of the absorption chiller and a linear model of the plant to be controlled (the conditioned space) are identified and presented. Experimental data was used for the determination of these models. A temperature controller was designed and applied to the plant model. This controller operates the absorption chiller under multiple load conditions and regulates the flow in the chilled water line based on the conditioned space requirements. The designed controller was implemented in the SAACS prototype. The system’s

Carlos A. González Lozano; Miguel Vélez Reyes, Ph.D.; Gerson Beauchamp Báez, Ph.D., Ph.D.

2004-01-01T23:59:59.000Z

185

Procedures for Rights Handling in the RFC Independent Submission Stream  

E-Print Network (OSTI)

This document specifies the procedures by which authors of RFC Independent Submission documents grant the community "incoming" rights for copying and using the text. It also specifies the "outgoing " rights the community grants to readers and users of those documents, and it requests that the IETF Trust manage the outgoing rights to effect this result. Status of This Memo This memo provides information for the Internet community. It does not specify an Internet standard of any kind. Distribution of this memo is unlimited. Copyright Notice Copyright (c) 2009 IETF Trust and the persons identified as the

R. Braden

2009-01-01T23:59:59.000Z

186

HSS Focus Group Meeting (Topical Meeting) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Focus Group Meeting (Topical Meeting) HSS Focus Group Meeting (Topical Meeting) Aging Workforce and Strategic Initiatives Meeting Date: November 6, 2008 Documents Available for...

187

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determinations By Date September 24, 2012 CX-009335: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 0924...

188

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By Date April 11, 2011 CX-005702: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Schmitz, Mary C. Date: 04112011 Location(s): Minnesota...

189

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

190

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

191

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

192

PAPER PREPARATION GUIDE AND SUBMISSION INSTRUCTIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

461E 461E Acceleration of the matrix multiplication of Radiance three phase daylighting simulations with parallel computing on heterogeneous hardware of personal computer Wangda Zuo University of Miami Andrew McNeil Lawrence Berkeley National Laboratory Michael Wetter Lawrence Berkeley National Laboratory Eleanor S. Lee Lawrence Berkeley National Laboratory Windows and Envelope Materials Group Building Technology and Urban Systems Department Environmental Energy Technologies Division April 2013 Published in Journal of Building Performance Simulation DOI: 10.1080/19401493.2013.795193 DISCLAIMER This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the

193

2014 NEJC Save the Date (Spanish)  

Energy.gov (U.S. Department of Energy (DOE))

2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014

194

Quantum groups  

Science Conference Proceedings (OSTI)

The theory of Quantum groups, although rather young, since the expression Quantum ... introduction of a suitable form of the quantum group, the algebra A ...

195

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-002614: Categorical Exclusion Determination Research and Education of Carbon Dioxide Separation from Coal Combustion Flue Gases with Regenerable Magnesium Solutions CX(s) Applied: B3.1, A9 Date: 02/12/2010 Location(s): Cincinnati, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory February 12, 2010 CX-002272: Categorical Exclusion Determination Carlsbad Programs Group, Building National Parks Highway B, Shop CX(s) Applied: B3.6 Date: 02/12/2010 Location(s): Carlsbad, New Mexico Office(s): NNSA-Headquarters, Sandia Site OfficeCarlsbad Programs Group, Building National Parks Highway B, Shop CX(s) Applied: B3.6 Date: 02/12/2010 Location(s): Carlsbad, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office Sandia National Laboratories/New Mexico (SNL/NM) proposes to continue

196

Application & Guidelines for Chartering an Employee Resource Group |  

NLE Websites -- All DOE Office Websites (Extended Search)

Services » Diversity and Inclusion » Employee Resource Groups » Services » Diversity and Inclusion » Employee Resource Groups » Application & Guidelines for Chartering an Employee Resource Group Application & Guidelines for Chartering an Employee Resource Group Employee Resource Groups (ERGs) are grassroots groups formed by employees across all demographics-race, national origin, gender, sexual orientation, disability, education, geography, military status, occupation, energy field, etc. ERGs are established by submission and approval of an Employee Resource Group Charter Application by the Office of Diversity and Inclusion and/or the Office of Economic Impact and Diversity, the Office of the Chief Human Capital Officer, and those National Nuclear Security Administration offices with delegated diversity and human capital

197

Parity Violation in Photonuclear Reactions at HIGS Submission to Fundamental Symmetries and Neutrino Physics Working Group  

E-Print Network (OSTI)

, National Taiwan U.; C. Crawford, University of Kentucky; N. Fomin, LANL; H. Gao, Duke; M. Gericke and Ying Wu1 1 Department of Physics, Duke University, Durham, NC 27708, USA 2 Department of Physics and Astronomy, University of South Carolina, Columbia, SC, 29208, USA 3 Indiana University/CEEM, 2401 Milo B

198

HSS Focus Group Training Work Group Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Focus Group Training Work Group Meeting HSS Focus Group Training Work Group Meeting HSS Focus Group Training Work Group Meeting Meeting Dates: July 10 - 11 The Department of Energy (DOE) Office of Health, Safety and Security (HSS) Focus Group Training Work Group met at the DOE National Training Center (NTC) inAlbuquerque, NM on Tuesday, July 10 and Wednesday, July 11, 2012. The meeting was chaired by the Work Group co-chairs, Karen Boardman (HSS/NTC),Pete Stafford (AFL-CIO BCTD/CPWR), and Julie Johnston (EFCOG). Attachment 1 is the Meeting Agenda; Attachment 2 is a list of meeting attendees; and Attachment3 is the proposed Radworker Training Reciprocity Program. Meeting Agenda Meeting Summary Draft RAD Worker Training Reciprocity Program for Work Group v.1 Draft Radiation Worker Portability Validation

199

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

200

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Page 1 of 22 Building Num: Date  

E-Print Network (OSTI)

Check List Page 1 of 22 Building Num: Date: Compressed Gases/WeldingChecklist Title: Action stored away from flammable materials? 1910.252(a)(2)(i) #12;Check List Page 2 of 22 Building Num: Date)(D) Is the insulation material intact on welding machine rod holders? 1910.254(d)(9)(i) #12;Check List Page 3 of 22

Homes, Christopher C.

202

APPROVED DATE 1 Matrix ORNL  

E-Print Network (OSTI)

Officer G. Smith1 SNS-HFIR User Group (SHUG) Neutron Scattering Science Advisory Committee (NSSAC) Human MSc. S. Voisin3 Post doc. ES&H G. Rowland, Manager L. Fagan HFIR ES&H P. Abston HFIR/SNS ES&H Neutron Scientific Assoc. T. Sherline Scientific Assoc. Vacant Scientific Assoc. HFIR Support Team K. Bailey Team

203

HSS Focus Group Training Work Group Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Meeting Training Work Group Meeting HSS Focus Group Training Work Group Meeting Meeting Dates: July 10 - 11 The Department of Energy (DOE) Office of Health, Safety and Security (HSS) Focus Group Training Work Group met at the DOE National Training Center (NTC) inAlbuquerque, NM on Tuesday, July 10 and Wednesday, July 11, 2012. The meeting was chaired by the Work Group co-chairs, Karen Boardman (HSS/NTC),Pete Stafford (AFL-CIO BCTD/CPWR), and Julie Johnston (EFCOG). Attachment 1 is the Meeting Agenda; Attachment 2 is a list of meeting attendees; and Attachment3 is the proposed Radworker Training Reciprocity Program. Meeting Agenda Meeting Summary Draft RAD Worker Training Reciprocity Program for Work Group v.1 Draft Radiation Worker Portability Validation Meeting Attendees

204

Argonne CNM News: Thinnest Nanofiltration Membrane to Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Thinnest Nanofiltration Membrane to Date Thinnest Nanofiltration Membrane to Date Thinnest membrane to date Close-packed nanoparticle monolayers self-assembled from dodecanethiol-ligated gold nanocrystals. TEM image (left) and atomistic simulation of tryptophan transport through a pore. A recent collaboration between users at the University of Chicago and the University of Illinois at Chicago with the Center for Nanoscale Material's Electronic & Magnetic Materials & Devices Group has produced the thinnest nanofiltration membrane achieved thus far, at ~30 nm, made of just four layers of nanoparticles. A separation membrane is a key component in both nanofiltration and reverse osmosis filtration systems. Typically they are microns-thick polymer films. Reducing the thickness of the membrane reduces the pressure that needs to

205

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2013 May 30, 2013 CX-010215: Categorical Exclusion Determination Laufer Wind Group National Wind Technology Center Structure Lighting Tests CX(s) Applied: B1.31, B5.15 Date: 05/30/2013 Location(s): Colorado Offices(s): Golden Field Office May 30, 2013 CX-010483: Categorical Exclusion Determination Man Hole Cover Assembly Replacement CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2013 CX-010508: Categorical Exclusion Determination Cloud County Community College Wind Turbine CX(s) Applied: A9, A11, B3.14 Date: 05/29/2013 Location(s): Kansas Offices(s): Golden Field Office May 29, 2013 CX-010480: Categorical Exclusion Determination Development of a Multi-User Network Testbed for Wide-Area Monitoring and

206

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-000889: Categorical Exclusion Determination Dissolution of Uranium and Plutonium Containing Residues from F and H Area CX(s) Applied: B3.6 Date: 02/12/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 12, 2010 CX-002614: Categorical Exclusion Determination Research and Education of Carbon Dioxide Separation from Coal Combustion Flue Gases with Regenerable Magnesium Solutions CX(s) Applied: B3.1, A9 Date: 02/12/2010 Location(s): Cincinnati, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory February 12, 2010 CX-002272: Categorical Exclusion Determination Carlsbad Programs Group, Building National Parks Highway B, Shop CX(s) Applied: B3.6 Date: 02/12/2010 Location(s): Carlsbad, New Mexico

207

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 6, 2011 September 6, 2011 CX-006492: Categorical Exclusion Determination Dry Process Electrode Fabrication CX(s) Applied: B3.6 Date: 09/06/2011 Location(s): Ann Arbor, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 6, 2011 CX-006488: Categorical Exclusion Determination Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering CX(s) Applied: B1.31, B5.1 Date: 09/06/2011 Location(s): Auburn Hills, Michigan Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office September 6, 2011 CX-006501: Categorical Exclusion Determination Interstate 55 Corridor and City of Springfield Electric Vehicle Project CX(s) Applied: B5.1 Date: 09/06/2011

208

CEA Â… External Power Supplies, CCE Overview and Update presentation, dated June 28, 2011.  

NLE Websites -- All DOE Office Websites (Extended Search)

CEA - External Power CEA - External Power Supplies CCE Overview and Update June 28, 2011 1 2 3 4 5 6 Agenda Certified Ratings Basic Models and Design Families Manufacturer and Importer Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory or * May elect to use a third-party (e.g., certified laboratory or foreign OEM) for testing and certification submission.

209

Ex parte submission of SANYO North America Corp. and SANYO E&E Corp. |  

NLE Websites -- All DOE Office Websites (Extended Search)

parte submission of SANYO North America Corp. and SANYO E&E parte submission of SANYO North America Corp. and SANYO E&E Corp. Ex parte submission of SANYO North America Corp. and SANYO E&E Corp. On November 2, 2010, Nobuko Horii of SANYO North America Corp., Kaz Fukukura and Paul Ramsbottom of SANYO E&E Corp, and Alan Fishel and Adam Bowser of Arent Fox LLP met with Timothy Lynch, Stephanie Weiner, Michael Kido and Laura Barhydt of the Office of the General Counsel and Ashley Armstrong of the Building Technologies Program to discuss ongoing energy-efficiency compliance and certification under Parts 430 and 431 of the Department's rules and regulations with respect to certain Sanyo refrigeration products and forthcoming guidance on such products. Specifically, Sanyo requested that interested parties be permitted to

210

View the Apps for Vehicles Phase One Submissions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

View the Apps for Vehicles Phase One Submissions View the Apps for Vehicles Phase One Submissions View the Apps for Vehicles Phase One Submissions January 24, 2013 - 11:13am Addthis 9 of the 37 entries for the Apps for Vehicles competition. 9 of the 37 entries for the Apps for Vehicles competition. Ian Kalin Director of the Energy Data Initiative How can I participate? Visit the competition website to view the submitted ideas. Starting on March 15, you'll be able to vote for your favorite completed apps. Apps for Vehicles The Open Data Initiative reached another milestone last week with the completion of the first phase of the Apps for Vehicles Challenge. This incentive-based competition seeks to improve safety and fuel efficiency through data innovation. Thirty-seven entries were submitted to the Challenge's judges, which are all publically viewable on the competition

211

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 CX-001501: Categorical Exclusion Determination Commercial Renewable Energy Systems - FLS Meadowood Garden Solar CX(s) Applied: B5.1 Date: 04012010 Location(s):...

212

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Non-Contaminating Cryogenic Fracturing Technology CX(s) Applied: B3.6 Date: 12202011 Location(s): Colorado Offices(s):...

213

High Precision Radiometric Dating of Sedimentary Materials  

SciTech Connect

To develop field, petrographic and geochemical criteria to allow high precision U-Pb dating of sedimentary minerals within rapidly deposited sequences of carbonate and clastic rocks.

Hanson, G. N.

2006-09-19T23:59:59.000Z

214

Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL  

E-Print Network (OSTI)

Feb 2003 Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL 1) Source: Bldg: ________________________________________ Disinfection? cc YES, Autoclaved (each container tagged with `Treated Biomedical Waste') cc YES, Chemical

Sinnamon, Gordon J.

215

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Portland) CX(s) Applied: A9 Date: 03012010 Location(s):...

216

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Los Angeles) CX(s) Applied: A9 Date: 03012010 Location(s):...

217

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 2011 CX-006930: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09282011 Location(s): Torrance, Los Angeles...

218

Group Vision Care Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Vision Vision Care Policy Group Name: LOS ALAMOS NATIONAL SECURITY, LLC. RETIREES Group Number: 12284390 Divisions 0005 & 0006 Effective Date: JANUARY 1, 2011 EVIDENCE OF COVERAGE Provided by: VISION SERVICE PLAN INSURANCE COMPANY 3333 Quality Drive, Rancho Cordova, CA 95670 (916) 851-5000 (800) 877-7195 EOC NM 03/02 11/25/08 CLD In addition to the information contained in this Benefit Program Summary, the LANS Health & Welfare Benefit Plan for Retirees Summary Plan Description contains important information about your LANS health and welfare benefits. For additional information: For Retirees: Customer Care Center (866) 934-1200 www.ybr.com/benefits/lanl LANL Benefits Website for Retirees: http://www.lanl.gov/worklife/benefits/retirees/

219

Using neighbors to date web documents  

Science Conference Proceedings (OSTI)

Time has been successfully used as a feature in web information retrieval tasks. In this context, estimating a document's inception date or last update date is a necessary task. Classic approaches have used HTTP header fields to estimate a document's ... Keywords: link analysis, web dynamics, web information retrieval

Sérgio Nunes; Cristina Ribeiro; Gabriel David

2007-11-01T23:59:59.000Z

220

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD EL QOTBI Tuna EL QOTBI Noemie FATMI Karine CLAIR Florian KNISCH Guillaume NAHON Charlotte SEHMOUNE Nabil AD : A

Douai, Antoine

222

NOAA, 2012 Climate Prediction Applications Science Workshop (CPASW), Climate Services for National Security Challenges: Abstract Submission  

E-Print Network (OSTI)

Security Challenges: Abstract Submission Presentation Title: The Impact of Climate Variability on Biofuel liters in 1996 to 24.6 billion liters in 2007 (Renewable Fuels Association, 2008), and the target annual use of biofuels by 2022 specified in the 2007 Energy Independence and Security Act is 136 billion

Miami, University of

223

The Aggressiveness of Order Submissions, Revisions and Cancellations during the Market Preopening Period.  

E-Print Network (OSTI)

This paper analyses the impact of the limit order book information on the aggressiveness observed in the submission of limit orders and the revision or cancellation of orders queued in the preopening period of an electronic limit order book equity market. To our knowledge we are the first to do so. We model each side of the order book separately using ordered probit models for submissions, forward and backward revisions, and order cancellations. In essence, we rank the aggressiveness of order submissions, revisions and cancellations based upon the impact of the action on the execution probability of the order. The empirical results indicate that the aggressiveness of order submissions and forward price revisions react to the existing and subsequent changes in the execution probability driven in part by the depth on either side of the order book. We find that backward price revisions less affected by order book depth, except that aggressive backward bid price revisions reduce when there is an increase in the ask depth below the top of the order book. This suggests that the bid side relies on the ask side to provide liquidity. We find that the aggressiveness of order cancellations increases on both sides of the order book when the depth at the top of the ask order book increases. Order submissions and forward and backward revisions aggression increase on the bid side when there is an increase in the height on both sides; however, we find mixed reactions on the ask side. Finally, the results indicates that aggressiveness observed in order cancellations is not impacted by the magnitude of the inside spread.

Michael Bowe; Stuart Hyde; Ike Johnson

2009-01-01T23:59:59.000Z

224

Microsoft Word - APPENDIX A-Submission-3.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

NOVEL CONCEPT FOR REDUCING WATER USAGE NOVEL CONCEPT FOR REDUCING WATER USAGE AND INCREASING EFFICIENCY IN POWER GENERATION FINAL REPORT Reporting Period Start Date: September 2002 Reporting Period End Date: September 2003 Principal Authors: Shiao-Hung Chiang Guy Weismantel Issuing Date: March 2004 DOE Award No.: DE-FG26-02NT41544 Submitted to U. S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY PITTSBURGH, PA 15236-0940 Submitting Organizations: University Of Pittsburgh Weismantel International Chemical & Petroleum Engineering Dept 1826 Spruce Knob Court Pittsburgh, PA 15261 Kingwood, TX 77339 DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their

225

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

226

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory November 23, 2009 CX-000206: Categorical Exclusion Determination Michigan Biogas Center of Excellence CX(s) Applied: A9, B3.6 Date: 11232009 Location(s): Flint,...

227

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery and Reinvestment Act State Energy Program - Estacada School District Biomass Boilers CX(s) Applied: B5.1 Date: 08032010 Location(s): Estacada, Oregon Office(s): Energy...

228

Property:PublicationDate | Open Energy Information  

Open Energy Info (EERE)

"PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2.8-Ma Ash-Flow Caldera At Chegem River In The Northern Caucasus Mountains (Russia),...

229

102nd Annual Meeting Dates to Remember  

Science Conference Proceedings (OSTI)

Dates to Remember November 1, 2010 Online registration opens January 7, 2011 Exhibitor Presentations: Deadline for abstracts to be printed in the abstract book January 31, 2011 Last day for early booth rental fees January 31, 2011 Booths cance

230

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Water Based, Critical Flow, Non-Vapor-Compression Cooling Cycle CX(s) Applied: B3.6 Date: 04302012 Location(s): Kansas...

231

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 CX-009271: Categorical Exclusion Determination National Governors Association Energy Project - Phase II CX(s) Applied: A9, A11 Date: 09102012 Location(s): CX: none...

232

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B1.23 Date: 09242012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory September 24, 2012 CX-009336: Categorical Exclusion...

233

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for High Performance Hospitals CX(s) Applied: A9, A11 Date: 09302010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, National...

234

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

235

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B3.6 Date: 03172010 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory March 17, 2010 CX-001327: Categorical...

236

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 CX-008228: Categorical Exclusion Determination Hydropower Energy Resource (HyPER) Harvester CX(s) Applied: A9 Date: 04112012 Location(s): New Mexico Offices(s): Golden...

237

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Golden Field Office November 24, 2010 CX-004532: Categorical Exclusion Determination Tidal Energy System for On-Shore Power Generation CX(s) Applied: A9, B3.6 Date: 11242010...

238

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Low-Cost Integrated Substrate for Organic Light-Emitting Diode (OLED) Lighting (Ewing) CX(s) Applied: B3.6 Date: 03192010 Location(s):...

239

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Reactor Technology for Hydro processing Bio-oils to Produce Gasoline, Diesel and Jet Fuel CX(s) Applied: A9, B3.6 Date: 05022011 Location(s): Maryland Office(s): Energy...

240

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program- ARRA Revolving Loan Fund- Ivan Smith Furniture- Compressed Natural Gas Vehicle Fueling Stations CX(s) Applied: B5.1, B5.22 Date: 02112013 Location(s):...

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar - Roof Mounted - Ebay CX(s) Applied: B5.1 Date: 02082011 Location(s): South Jordan, Utah Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February...

242

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Laboratory April 11, 2011 CX-005602: Categorical Exclusion Determination Jet Drilling With Energized Fluids CX(s) Applied: B3.6, B3.7 Date: 04112011 Location(s):...

243

# Energy Measuremenfs Group  

Office of Legacy Management (LM)

ri EECE ri EECE # Energy Measuremenfs Group SUMMARY REPORT . AiRIAL R4DIOLOGICAL SURVEY - NIAGARA FALLS AREA NIAGARA FALLS, NEh' YORK DATE OF SURVEY: SEPTEMBER 1979 APPROVED FOR DISTRIBUTION: P Stuart, EC&G, Inc. . . Herbirt F. Hahn, Department of Energy PERFDRflED BY EGtf, INC. UNDER CONTRACT NO. DE-AHO&76NV01163 WITH THE UNITED STATES DEPARTMENT OF ENERGY II'AFID 010 November 30, 1979 - The Aerial Measurements System (A%), operated by EC&t, Inc< for the Un i ted States Department of Energy, was used during November 1976 to conduct an exploratory aerial radiological survey in-the greater Niagara Fails area. The purpose of that survey was to identify locations having concentrations of terrestrial radioactivity not typical of the radiation

244

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

245

Facility Owner Contractor Award Date End Date Options/Award Term  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OptionsAward Term Ultimate Potential Expiration Date Contract FY Competed Parent Companies LLC Partners DOE Site Procurement Director DOE Contracting Officer SLAC National...

246

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

247

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

248

Computational Age Dating of Special Nuclear Materials  

SciTech Connect

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

249

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

250

Metadata Provided to OSTI via 241.4 (Software Submission) | Scientific and  

Office of Scientific and Technical Information (OSTI)

4 (Software Submission) 4 (Software Submission) Print page Print page Email page Email page STI Metadata Elements Required (R), Required, but allows for default value (RWD), or Optional (O). Metadata Element Description Required/Optional Record Status Identifies the software product as new or revised R Software Title The title, acronym, and short KWIC (keywords in context) title of the software. R Software Developer(s) Unlimited number is acceptable; the primary software developer should be listed first. Allows for NONE as an option for few cases where necessary. R E-mail Address(es) Provide in same order as developer names. Will not be available to end-user. O Site Product Number Unique site number that identifies software product. O DOE Contract Number Required for all (can be NONE) R R&D Project ID

251

27th Annual SSRL Users' Meeting -- Poster Session & Abstract Submission  

NLE Websites -- All DOE Office Websites (Extended Search)

Poster Session Poster Session Poster Abstract Submissions - Due October 9 Users are invited to display posters highlighting research activities conducted over the past year at SSRL. Posters will be displayed throughout the meeting and will be highlighted during a poster session and reception on Thursday, October 19. Graduate students submitting posters must also register for the Users' Meeting and are eligible for one of four poster prizes. All posters require submission of the poster abstract form via the web no later than October 9. Each author will be assigned a 48" x 48" foam board on which diagrams, graphs, data, pictures and a small amount of text may be mounted. The foam board will be mounted on an easel. Each author will be expected to remain with his/her poster presentation throughout the poster session on Thursday afternoon.

252

Non-Unit Faculty Effective Date  

E-Print Network (OSTI)

SUBJECT: Non-Unit Faculty Evaluation Effective Date: 05-18-11 Policy Number: 4-500.1 Supersedes: 4 Adoption: 03-30-05 APPLICABILITY/ACCOUNTABILITY: This policy is applicable to all units and departments that employ non-unit faculty employees in regular positions. POLICY STATEMENT: Non-unit faculty members

Glebov, Leon

253

SAVE THE DATE! UC Energy Week 2011  

E-Print Network (OSTI)

SAVE THE DATE! UC Energy Week 2011 April 4 - 7, 2011 Hosted by the University of California, Davis Building on the success of the 2010 UC Energy Week, the California Renewable Energy Collaborative (CREC) is primed to host UC Energy Week 2011. The event consists of a global energy symposium, three forums

Islam, M. Saif

254

CURRICULUM VITAE Date: December 23, 2010  

E-Print Network (OSTI)

Medical Center (Australia), 2006. Courtney Harrison, University of Kentucky, 2006. Alena Mozhaeva, Joint: Institution: National University of La Plata, Medical School, La Plata, Buenos Aires, Argentina Degree: M.D. Date of Graduation: 1984 Institution: National University of La Plata Medical School, La Plata, Buenos

255

Property:Geothermal/AwardDate | Open Energy Information  

Open Energy Info (EERE)

AwardDate Jump to: navigation, search Property Name GeothermalAwardDate Property Type String Description Award Date Retrieved from "http:en.openei.orgwindex.php?titleProperty...

256

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

257

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

258

EV Project Overview Report - Project to Date through March 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

to date through March 2012 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity Consumed (AC MWh)...

259

TASK PLAN: Tribal Issues Topic Group  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Page 1 Status: Active DOE Lead: National Transportation Program (NTP-AL; Judith Holm @ 505-845-4767) Start Date: January 1998 End Date: TBD Subject: TEC Topic Group - Tribal Issues rpose: To address issues such as: (1) HM-164 as it relates to Tribes; (2) to complete the Tribal column of the Rail Topic Group Regulatory Matrix; (3) to determine Tribal authority to stop and inspect shipments of radioactive materials; (4) to provide tribal pre-notification of DOE spent fuel shipments consistent with DOE policy and to provide continuous satellite-based tracking and monitoring capability to Tribes; (5) and to address Tribal involvement in transportation planning, training, and funding. The Topic Group

260

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network (OSTI)

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration Flow Coil Design etc. Finger Print Relationship Every evaporator is unique Unstable Region * = examples

Oak Ridge National Laboratory

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

262

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

263

Carbon-14 Bomb-Pulse Dating  

Science Conference Proceedings (OSTI)

Atmospheric testing of nuclear weapons during the 1950s and early 1960s doubled the concentration of carbon-14 atmosphere and created a pulse that labeled everything alive in the past 50 years as carbon moved up the food chain. The variation in carbon-14 concentration in time is well-documented and can be used to chronologically date all biological materials since the mid-1950s.

Buchholz, B A

2007-12-16T23:59:59.000Z

264

Low energy cyclotron for radiocarbon dating  

Science Conference Proceedings (OSTI)

The measurement of naturally occurring radioisotopes whose half lives are less than a few hundred million years but more than a few years provides information about the temporal behavior of geologic and climatic processes, the temporal history of meteoritic bodies as well as the production mechanisms of these radioisotopes. A new extremely sensitive technique for measuring these radioisotopes at tandem Van de Graaff and cyclotron facilities has been very successful though the high cost and limited availability have been discouraging. We have built and tested a low energy cyclotron for radiocarbon dating similar in size to a conventional mass spectrometer. These tests clearly show that with the addition of a conventional ion source, the low energy cyclotron can perform the extremely high sensitivity /sup 14/C measurements that are now done at accelerator facilities. We found that no significant background is present when the cyclotron is tuned to accelerate /sup 14/C negative ions and the transmission efficiency is adequate to perform radiocarbon dating on milligram samples of carbon. The internal ion source used did not produce sufficient current to detect /sup 14/C directly at modern concentrations. We show how a conventional carbon negative ion source, located outside the cyclotron magnet, would produce sufficient beam and provide for quick sampling to make radiocarbon dating milligram samples with a modest laboratory instrument feasible.

Welch, J.J.

1984-12-01T23:59:59.000Z

265

[Expanding Queries Using Multiple Resources; The AID Group ...  

Science Conference Proceedings (OSTI)

... in-house [8]. As post- submission experiments we include the results of using the default Lucene retrieval model, as well as Lemur and In- dri [12]. ...

2007-02-16T23:59:59.000Z

266

Recommended Rule Amendment This Market Rule number is located on the “Current Market Rule Amendment ” web page. Date relevant Amendment Submission, Proposed or Recommended Rule Amendment posted for  

E-Print Network (OSTI)

Provide your comments. I agree that the current requirement for IMO compliant metering does place an increased and unnecessary financial burden on the generation facility owner and the host transmission customer (the LDC’s). From the generator facility owner’s perspective, installing IMO metering generally provides no direct benefit. Depending on the physical situation, there is almost always revenue-grade metering installed already on the physical generator(s), and a revenue-grade metering installation suitable to the LDC installed at the point of connection. Installing IMO metering will often duplicate metering information already available. The marginal increase in level of accuracy and redundancy of IMO compliant metering is not worth the added cost. If we were talking about large generators (greater than 20 MW as suggested in the proposal), redundant and highly accurate metering would be installed just as a matter of course, as the dollars involved certainly justify it. However, on these smaller projects, the financial pressures are substantial, and adding the extra capital cost and ongoing maintenance and re-certification of IMO metering just cannot be justified from our

unknown authors

2004-01-01T23:59:59.000Z

267

This Market Rule number is located on the “Current Market Rule Amendment ” web page. Date relevant Amendment Submission, Proposed or Recommended Rule Amendment posted for  

E-Print Network (OSTI)

Provide your comments. It is understandable that when the market is not suspended and the IMO administers pricing for less than 24 intervals, participants accept the market schedule and pricing. During times where the event exceeds 24 intervals it would be fair for participants to receive compensation equal to their incremental costs, but not an additional 10 % for profit. In these instances both sides of the market are affected, for example on January 15 customers made operational decisions based on market pricing. When this pricing is administered after the fact those operational decisions cannot be changed and profit for downtime cannot be recovered. During times of market suspension it is most likely due to a severe stress on the system and all market participants should be responsible and follow the instructions of the IMO or the government (in the case of the August blackout). It is unfair to generators that are unable to generate and loads that may have had to forgo production to have a few lucky people profit from their ability to generate. This is not “sharing the pain ” in an equitable fashion. It’s seems fair they can

Type Rule; Amendment X

2004-01-01T23:59:59.000Z

268

This Market Rule number is located on the “Current Market Rule Amendment ” web page. Recommended Rule Amendment Date relevant Amendment Submission, Proposed or Recommended Rule Amendment posted for  

E-Print Network (OSTI)

Provide your comments. I agree that the current requirement for IMO compliant metering does place an increased and unnecessary financial burden on the generation facility owner and the host transmission customer (the LDC’s). From the generator facility owner’s perspective, installing IMO metering generally provides no direct benefit. Depending on the physical situation, there is almost always revenue-grade metering installed already on the physical generator(s), and a revenue-grade metering installation suitable to the LDC installed at the point of connection. Installing IMO metering will often duplicate metering information already available. The marginal increase in level of accuracy and redundancy of IMO compliant metering is not worth the added cost. If we were talking about large generators (greater than 20 MW as suggested in the proposal), redundant and highly accurate metering would be installed just as a matter of course, as the dollars involved certainly justify it. However, on these smaller projects, the financial pressures are substantial, and adding the extra capital cost and ongoing maintenance and re-certification of IMO metering just cannot be justified from our

unknown authors

2004-01-01T23:59:59.000Z

269

This Market Rule number is located on the “Current Market Rule Amendment ” web page. Date Relevant Amendment Submission, Proposed or Recommended Rule Amendment Posted for  

E-Print Network (OSTI)

Provide your comments. Safety Power Inc. is a newly established company focused on the development of a strategic business opportunity involving the aggregation of standby generators in the Province of Ontario. The purpose of which is to provide a dispatchable generation asset base for use during peak periods. PowerStream Inc. and Safety Power Inc. have recently partnered to implement a "Pilot Project " within PowerStream's service area involving the use of a 1MW standby generator. The Project is expected to be operational this summer. We believe that the Safety Power Program is a viable solution to addressing the increasing power supply issues like those being experienced in the York Region. Furthermore, it is our strong belief that some form of realistic pricing compensation needs to be in place in order to provide the proper incentives to encourage investment in DR and peaking generation. This incentive can be in the form of "scarcity pricing " on the HOEP or some form of capacity payment made to companies like Safety Power. Safety Power Inc. is formally submitting these comments in support of the IESO's proposed rule ammendment and wish to congratulate you on your efforts to mitigate the counterintuitive impact on electricity pricing during "emergency " situations. PART 4 – EXTERNAL CONSULTATION MEETING

unknown authors

2005-01-01T23:59:59.000Z

270

For IMO Use Only MR-00247-R00-R02 PART 2 – MARKET RULE AMENDMENT REFERENCE Date relevant Amendment Submission, Proposed or Recommended Rule Amendment posted for  

E-Print Network (OSTI)

Provide your comments. Hydro One in general supports the Market Rule amendment as proposed but has one comment regarding Section 8.4.1: “8.4.1 A market participants whose facility is part of a manually armed SPS may reject a request to arm the SPS where the arming would endanger the safety of any person, damage equipment or violate any applicable law.” As currently stated in the above amendment proposal, it is not clear what is meant by the term “manually armed”, and why it is needed. The intent of this Market Rule amendment is to allow a market participant whose facility is part of an SPS to reject arming of the said SPS if that market participant deems this to be the appropriate action for the reasons stated in the amendment proposal. If the intent of the term “manually armed ” is to refer to situations where an intermediary is used by the IMO to physically arm the SPS, as opposed to situations where the IMO can arm the SPS without the use of intermediary, then the inclusion of the terms “manually armed ” is inappropriate. To do so would not meet the intent of the Market Rule amendment as originally proposed. A market participant whose

unknown authors

2004-01-01T23:59:59.000Z

271

TEC Working Group Topic Groups Archives  

Energy.gov (U.S. Department of Energy (DOE))

The following Topic Groups are no longer active; however, related documents and notes for these archived Topic Groups are available through the following links:

272

NEWTON: Blood Group Systems Usage  

NLE Websites -- All DOE Office Websites (Extended Search)

Blood Group Systems Usage Blood Group Systems Usage Name: Kishori Status: student Grade: n/a Location: Outside U.S. Country: India Date: Summer 2013 Question: What is the difference between MN blood group system and ABO bloodgroup system? Although, we nowadays prefer ABO blood groups why do we use MN blood groups in the forensic department? Replies: Humans actually have multiple blood antigens on the surface of our blood cells. Wikipedia says that there are over 50 different blood group antigens. ABO and Rh are just the most dominant. Rh actually has 3 alleles called C, D and E. So one could be CCddee, for example, but clinically, when referring to Rh, only the D antigen is considered. So MN is another system that is also present. The reason it would be considered in forensics is due to population genetics considerations. Certain combinations are found in different percentages depending on what ancestry a person is a part of. Humans evolved in isolation from each other and until relatively recently, were separated due to difficult travel/migration. But even though we can move around the planet easily now, we still carry the history of our ancestry in our DNA. M and N are codominant, like the ABO system.

273

Thme Date Enseignant Thme Date Enseignant AKIN Tuna Suites 16-mai AD Equa diff 24-mai RL  

E-Print Network (OSTI)

Page 1 Page 1 Thème Date Enseignant Thème Date Enseignant AKIN Tuna Suites 16-mai AD Equa diff 24 Probas 23-mai MAC Thème Date Enseignant Thème Date Enseignant AKIN Tuna Configurations 31-mai DT Arithm

Douai, Antoine

274

Security Technologies Group  

Science Conference Proceedings (OSTI)

Security Technologies Group. Welcome. Our group develops measurement science in support of performance-based standards ...

2012-10-24T23:59:59.000Z

275

NIST Optical Radiation Group  

Science Conference Proceedings (OSTI)

Optical Radiation Group. Welcome. The Optical Radiation Group maintains, improves, and disseminates the national scales ...

2013-07-29T23:59:59.000Z

276

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

277

Undergraduate Handbook 2013-14 Welcome to Oxford, or welcome back to Oxford!  

E-Print Network (OSTI)

will need to enter search parameters as follows: select "By year group" on the left hand side of the screen dates (of teaching terms, course-work submission deadlines, field trips and so on), that you will need

Henderson, Gideon

278

Are individual forgiveness interventions for adults more effective than group interventions? A meta-analysis.  

E-Print Network (OSTI)

?? Several questions remain unanswered to date: What type of forgiveness intervention is more effective, individual or group treatment, psychotherapeutic or psychoeducational approach, long-term or… (more)

Rainey, Cheryl A.

2008-01-01T23:59:59.000Z

279

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

280

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

282

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

283

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

284

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

285

DOE-EA-1184 Date Prepared:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

286

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

287

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

288

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

289

Committee for Limited Submissions in the Sciences and Engineering (ComLSSE) Professor R. Hampton, Division of Biological Sciences  

E-Print Network (OSTI)

Committee for Limited Submissions in the Sciences and Engineering (ComLSSE) AY10-11 Professor R. Hampton, Division of Biological Sciences Professor W. Hodgkiss, Scripps Institution of Oceanography, Chair Professor D. Kleinfeld, Division of Physical Sciences Professor M. Krstic, Jacobs School of Engineering

Gleeson, Joseph G.

290

TEC Working Group Topic Groups Archives Consolidated Grant Topic Group |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Grant Topic Consolidated Grant Topic Group TEC Working Group Topic Groups Archives Consolidated Grant Topic Group The Consolidated Grant Topic Group arose from recommendations provided by the TEC and other external parties to the DOE Senior Executive Transportation Forum in July 1998. It was proposed that the consolidation of multiple funding streams from numerous DOE sources into a single grant would provide a more equitable and efficient means of assistance to States and Tribes affected by DOE nuclear material shipments. The group serves as an important vehicle for DOE senior managers to assess and incorporate stakeholder input into the development of a consolidated funding vehicle for transportation activities, should DOE implement such a program. Some of the major issues under consideration by the Consolidated Grant

291

TEC/WG Tribal Topic Group  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conference Call Conference Call December 6, 2005 Group Chair: Jay Jones (DOE/OCRWM) Participating TEC Tribal Topic Group Members: Kevin Clarke (DOE/RL), Kristen Ellis (DOE/CI), Lisa Gover (NTEC), Dan King (Oneida Nation), Corinne Macaluso (DOE/OCRWM), Ellen Ott (DOE/GC), Ted Repasky (CTUIR), Cathy Reynolds (DOE/GC), Lisa Sattler (CSG-MW) Herman Shorty (Navajo Nation), Linda Sikkema (NCSL), Christopher Wells (SSEB) DOE support contractors also participated in this call. Action Items: Responsible Party Action to be Taken Wilda Portner Email potential conference call dates to Tribal representatives who are members of the Topic Group. Ask for their input on which of 2 or 3 dates are the most convenient for the call. Follow up emails with faxes and phone calls as necessary.

292

Carbon dating impacts non-proliferation, drug research and climate...  

NLE Websites -- All DOE Office Websites (Extended Search)

25 years of carbon dating. Carbon dating impacts non-proliferation, drug research and climate change Anne M Stark, LLNL, (925) 422-9799, stark8@llnl.gov Lawrence Livermore...

293

Property:ASHRAE 169 End Date | Open Energy Information  

Open Energy Info (EERE)

property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:ASHRAE169EndDate&oldid21585" What links here Related changes Special pages Printable...

294

Property:GBIG/ObservationEndDate | Open Energy Information  

Open Energy Info (EERE)

ObservationEndDate Jump to: navigation, search This is a property of type String. Retrieved from "http:en.openei.orgwindex.php?titleProperty:GBIGObservationEndDate&oldid5093...

295

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

296

TEC Working Group Topic Groups Tribal  

Energy.gov (U.S. Department of Energy (DOE))

The Tribal Topic Group was established in January 1998 to address government-to-government consultation between DOE and Indian Tribes affected by its transportation activities. The group focuses on...

297

Engineered Fire Safety Group  

Science Conference Proceedings (OSTI)

Engineered Fire Safety Group. Welcome. ... Employment/Research Opportunities. Contact. Jason Averill, Leader. Engineered Fire Safety Group. ...

2012-06-05T23:59:59.000Z

298

Energy Research Group Homepage  

Science Conference Proceedings (OSTI)

Energy Research Group. Welcome. The newest Group in the CNST develops instruments designed to reveal the nanoscale ...

2012-10-02T23:59:59.000Z

299

A submission to the Australian Greenhouse Office draft document: Analysis of the Potential Policy Options for Energy Efficiency Improvements to Televisions The Energy Efficiency and Conservation Authority  

E-Print Network (OSTI)

1. This submission is in response to the draft Analysis of the Potential Policy Options for Energy Efficiency Improvements to Televisions, produced by Energy Consult Pty Ltd for the Australian Greenhouse Office in August 2004.

unknown authors

2004-01-01T23:59:59.000Z

300

Inquiry into School Libraries and Teacher Librarians in Australian Schools QCEC submission to the House of Representatives Standing Committee on Education and Training  

E-Print Network (OSTI)

The Queensland Catholic Education Commission (QCEC) welcomes the opportunity to make this submission to the House of Representatives Inquiry into school libraries and teacher librarians in Australian Schools, which will inquire into and report on the role, adequacy and resourcing of school libraries and teacher librarians in Australia’s public and private schools. This submission is made on behalf of the 22 Catholic school employing authorities and the 288 Catholic schools in Queensland. Some of the individual schooling authorities and teacher librarians may choose to make separate submissions. Background Teaching and learning in schools is achieved through the complex interaction of people and physical structures. School libraries are included in this. As there is the tendency to variously term school libraries as ‘resource centre’, ‘information service centre ’ a statement of what is meant by a ‘school library ’ in this submission becomes necessary.

unknown authors

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

302

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

303

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD 3 04-avr MAC  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD 3 04-avr Date Enseignant AKIN Tuna 34 12-avr DT 69 02-mai RL EL QOTBI Noemie 51 11-avr AD 41 30-avr DT FATMI

Douai, Antoine

304

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 28 5 dc. CC 4 3 18 dc. DT  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 28 5 déc. CC 4 3 18 déc Nabil 9 17 déc. SJ 4 0 14 déc. DT Intitule Date Enseignant AKIN Tuna 22 20 déc. PJ EL QOTBI Noemie 63 6

Douai, Antoine

305

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

306

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

307

TEC Working Group Topic Groups Security  

Energy.gov (U.S. Department of Energy (DOE))

The Security Topic group is comprised of regulators, law enforcement officials, labor and industry representatives and other subject matter experts concerned with secure transport of spent nuclear...

308

Lighting Group: What's New  

NLE Websites -- All DOE Office Websites (Extended Search)

What's New What's New in the Lighting Group For more information on what's new in the Lighting Group, please contact: Francis Rubinstein Lighting Group Leader (510) 486-4096...

309

Nuclear Materials Management and Safeguards System Working Group Charter  

National Nuclear Security Administration (NNSA)

DRAFT 2011 DRAFT 2011 DRAFT 2011 Nuclear Materials Management and Safeguards System Working Group Charter VERSION: 0 REVISION DATE: May 2011 Approver Name Title Signature Date DRAFT 2011 DRAFT 2011 NMMSS Working Group Charter PURPOSE The NMMSS Working Group (NWG) serves as an open forum for discussion of issues and concerns from the NMMSS User community. The Committee will provide an interface between NMMSS users, NMMSS sponsors and the NMMSS project staff. Activities may include: Identifying user needs Identifying deficiencies in reporting capabilities Recommending upgrades to software capabilities Recommending priorities for modifications Recommending enhancements to data Minimizing the reporting burden on the reporting community

310

Sustainable Energy Systems Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Sustainable Energy Systems Group The Sustainable Energy Systems Group studies the impacts of energy generation and use, manufacturing, and other activities on the environment, the...

311

Scientific Interest Groups  

NLE Websites -- All DOE Office Websites (Extended Search)

synchrotron research in a particular area. View monthly meetings on calendar Groups Catalysis Randall Winans, APS The Catalysis group meets at noon on the second Tuesday of each...

312

Searching for Global Dimming Evidence at SGP and Update of ARM Submissions to BSRN  

NLE Websites -- All DOE Office Websites (Extended Search)

Searching for Global Dimming Evidence at SGP and Searching for Global Dimming Evidence at SGP and Update of ARM Submissions to BSRN G. Hodges Cooperative Institute for Research in Environmental Sciences University of Colorado Boulder, Colorado Introduction Global dimming, usually defined as a reduction of incoming solar radiation (insolation) at the surface of the earth, is a topic being discussed with increasing frequency. A recent news article on global dimming in the web-based newspaper the Guardian Unlimited seems to have brought this issue to the forefront with scientists and laypeople alike. In fact, there is a special session devoted to global dimming at the upcoming May 17-21 American Geophysical Union (AGU) meeting in Montreal, Canada. The article quotes Atsumu Ohmura and references his findings on this subject.

313

Groups defined by automata  

E-Print Network (OSTI)

This is Chapter 24 in the "AutoMathA" handbook. Finite automata have been used effectively in recent years to define infinite groups. The two main lines of research have as their most representative objects the class of automatic groups (including word-hyperbolic groups as a particular case) and automata groups (singled out among the more general self-similar groups). The first approach implements in the language of automata some tight constraints on the geometry of the group's Cayley graph, building strange, beautiful bridges between far-off domains. Automata are used to define a normal form for group elements, and to monitor the fundamental group operations. The second approach features groups acting in a finitely constrained manner on a regular rooted tree. Automata define sequential permutations of the tree, and represent the group elements themselves. The choice of particular classes of automata has often provided groups with exotic behaviour which have revolutioned our perception of infinite finitely ge...

Bartholdi, Laurent

2010-01-01T23:59:59.000Z

314

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

315

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

316

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

317

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

318

Interannual variability of summer monsoon rainfall onset date across India  

E-Print Network (OSTI)

Variability of Indian summer monsoon onset dates is investigated at 1-degree spatial resolution by applying an agronomic definition (i.e. the first significant rains without a potentially damaging dry spell thereafter) to gridded observed daily rainfall data (1951–2003). Median onset dates compare well with previous estimates. The inter-quartile range varies from less than two weeks over the monsoon zone and western Ghats, to about a month over the northwestern desert. Local onset date is shown to be poorly correlated with regional-scale definitions of monsoon onset, and this is attributed to low estimates of spatial coherence, found for local onset-date variability. There is a weak relationship between local onset date and the June–September seasonal rainfall total, while the latter is shown to be more spatially coherent—and thus more potential predictable—over the monsoon zone than local onset date. 1.

Vincent Moron; Andrew W. Robertson

2009-01-01T23:59:59.000Z

319

PanDA Pilot Submission using Condor-G: Experience and Improvements  

Science Conference Proceedings (OSTI)

PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison. In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.

Zhao X.; Hover John; Wlodek Tomasz; Wenaus Torre; Frey Jaime; Tannenbaum Todd; Livny Miron

2011-01-01T23:59:59.000Z

320

AFRICAN AMERICAN AFFINITY GROUP ARTICLES OF THE CONSTITUTION & BYLAWS  

NLE Websites -- All DOE Office Websites (Extended Search)

AFRICAN AMERICAN AFFINITY GROUP AFRICAN AMERICAN AFFINITY GROUP ARTICLES OF THE CONSTITUTION & BYLAWS Date: May 22, 2012 African-American Affinity Group AFRICAN AMERICAN AFFINITY GROUP ARTICLES OF THE CONSTITUTION - 2 - Revised and accepted May 22, 2012 ARTICLES OF THE CONSTITUTION ARTICLE I - NAME SECTION 1 The name of the Organization is the "African -American Affinity Group" (AAAG). ARTICLE II - MISSION SECTION 1 The African-American Affinity Group (AAAG) exists to provide a forum where employees and guests can promote awareness of the Black, African, African-American and Caribbean cultures, share professional insights, acquire information and provide leadership on their careers and work

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Energy Research Group Staff Page  

Science Conference Proceedings (OSTI)

Energy Research Group Staff. ... Nikolai Zhitenev, Group Leader Nikolai Zhitenev is the Group Leader of the CNST Energy Research Group. ...

2013-11-08T23:59:59.000Z

322

Bioanalytical Science Group  

Science Conference Proceedings (OSTI)

Bioanalytical Science Group. Welcome. We provide the measurement science, standards, technology, and data required ...

2013-02-08T23:59:59.000Z

323

Lighting Research Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Lighting Research Group overview what's new publications software facilities people contact us links...

324

Scientific Working Groups  

Science Conference Proceedings (OSTI)

... TWGDAM 1988). SWGDOG, Scientific Working Group on Dogs and Orthogonal Detection Guidelines, 2004. SWGTOX, Scientific ...

2013-07-10T23:59:59.000Z

325

QUANTUM GROUPS JOHAN KUSTERMANS  

E-Print Network (OSTI)

QUANTUM GROUPS JOHAN KUSTERMANS Syllabus: #15; The de#12;nition of a locally compact quantum group: motivational ex- amples and special cases. The classical case, compact and discrete quantum groups. #15 for weights. #15; The general de#12;nition of a locally compact quantum group and its basic consequences

Schürmann, Michael

326

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

327

Abstract: Keep Your `Steam Tables' up to Date  

Science Conference Proceedings (OSTI)

Keep Your `Steam Tables' up to Date. Allan H. Harvey and William T. Parry. Chem. Eng. Prog., 95(11), 45-49 (Nov. 1999). ...

328

WAPA Tribal Webinar Series - topics and dates | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Webinar: Lessons From Iowa: The Economic, Market, and Organizational Issues in Making Bulk Energy Storage Work - February 9, 2012 (new date) NIST Green Button Presentation...

329

Revised 2-14-2013 Date ____/_____/___ Participant Number ________________________  

E-Print Network (OSTI)

________________________________________ Age _________ Height ___________ Weight __________ Last name First name Middle initial Date of Birth ____________________________________________ Telephone (home) (_____) _____-________ City ____________________________________________ Telephone (work-ray _________________________ _____/_____/_____ ____________________________ Ultrasound _________________________ _____/_____/_____ ____________________________ Nuclear Medicine

330

EV Project Overview Report - Project to Date through December...  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

331

EV Project Overview Report - Project to Date through September...  

NLE Websites -- All DOE Office Websites (Extended Search)

September 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

332

EV Project Overview Report - Project to Date through June 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

June 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

333

PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies...  

NLE Websites -- All DOE Office Websites (Extended Search)

MBG Auditorium PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies - "Big Data at the Pittsburgh Supercomputing Center" Professor Ralph Roskies Pittsburgh...

334

Groundwater Age-Dating for Water Resource Characterization  

The LLNL Groundwater Noble Gas Mass Spectrometry Facility and Capability offers: Less model-dependent than tritium age dating: Traditional tritium age ...

335

Fermilab | Employee Advisory Group | Focus Group Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Phone Book Fermilab at Work Search Search Go Skip over navigation to main content EAG Home About the EAG EAG Members Questions and Answers Suggestions and Questions Focus Group...

336

Rational subsets of groups  

E-Print Network (OSTI)

This text, Chapter 23 in the "AutoMathA" handbook, is devoted to the study of rational subsets of groups, with particular emphasis on the automata-theoretic approach to finitely generated subgroups of free groups. Indeed, Stallings' construction, associating a finite inverse automaton with every such subgroup, inaugurated a complete rewriting of free group algorithmics, with connections to other fields such as topology or dynamics. Another important vector in the chapter is the fundamental Benois' Theorem, characterizing rational subsets of free groups. The theorem and its consequences really explain why language theory can be successfully applied to the study of free groups. Rational subsets of (free) groups can play a major role in proving statements (a priori unrelated to the notion of rationality) by induction. The chapter also includes related results for more general classes of groups, such as virtually free groups or graph groups.

Bartholdi, Laurent

2010-01-01T23:59:59.000Z

337

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

338

Student Common Interest Group  

Science Conference Proceedings (OSTI)

Students interested in the oils and fats industry make valuable networking connections by joining the AOCS Student Common Interest Group. Student Common Interest Group Student Membership achievement aocs application award awards distinguished divi

339

Quantum Chevalley groups  

E-Print Network (OSTI)

The goal of this paper is to construct quantum analogues of Chevalley groups inside completions of quantum groups or, more precisely, inside completions of Hall algebras of finitary categories.

Berenstein, Arkady

2012-01-01T23:59:59.000Z

340

Hydrogen Analysis Group  

DOE Green Energy (OSTI)

NREL factsheet that describes the general activites of the Hydrogen Analysis Group within NREL's Hydrogen Technologies and Systems Center.

Not Available

2008-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Microanalysis Research Group Staff  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Microanalysis Research Group Staff. ... Joseph M. Conny, Research Chemist. Jeff M. Davis, Materials Research Engineer. ...

2013-05-15T23:59:59.000Z

342

Retrieval Group Digital Video  

Science Conference Proceedings (OSTI)

This site is no longer in use and will soon disappear entirely. The Retrieval Group Information Access Division Last updated ...

343

Working Group 7 Summary  

SciTech Connect

The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

Nagaitsev S.; Berg J.

2012-06-10T23:59:59.000Z

344

Evaluated Submissions  

Science Conference Proceedings (OSTI)

... 0; Chapman; 1; hjr1; Citizen Kane, The Other Side of the Wind, Don Quixote ... 15335; 811; 8; 0; 0; rutgers; SDD; S12; Denmark = 5.1 mill., No answer ...

345

PUBLIC SUBMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that DOE is not requiring an audit of financial statements solely to address this audit requirement and DOE will not recognize andor reimburse any costs associated with the...

346

PUBLIC SUBMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

management processes in-lieu of the DOENNSA management processes o reduce low value DOE Orders and implementation of consensus standards such as the International...

347

Abstract Submission  

Science Conference Proceedings (OSTI)

L. Modeling and Simulation of Processes, Microstructures, and Behavior · M. Bulk Metallic Glasses, Nanocrystalline Materials, and Ultrafine-Grain Materials · N.

348

Summary of potassium/argon age dating, 1979  

DOE Green Energy (OSTI)

During FY-79 the K/Ar dating laboratory at the Department of Geology and Geophysics of the University of Utah became operational. During the past calendar year forty-seven dates have been produced from areas predominantly in Utah. Dating has also been done on areas in Nevada and Montana through the State-Coupled program and Case Studies Support program. Areas in wich activity was concentrated include: Cove Creek Domes/Twin Peaks Area, SW Utah. Here volcanic activity spanned the time from 2.74 to 2.35 M.Y., with a mean age of 2.50 +- 0.14 M.Y. Black Rock Desert, SW Utah. Two dates on a single flow indicate an age of 1.49 +- 0.08 M.Y. for a flow previously undated. Wildcat Creek Area, SW Utah. Dating of rhyolite flows from this area gives a mean age of volcanism of 9.25 +- 0.16 M.Y., considerably older than previously inferred by the work of Haugh (1978). Mineral Mountains Pluton, SW Utah. Twelve dates on phases of the pluton indicate a complex history of intrusion, and more work is indicated in order to derive a coherent picture of the magmatic events leading to the formation of this batholith. Blackfoot Reservoir, Idaho. Two dates on rhyolite domes, previously updated, give ages of 1.56 +- 0.06 M.Y. and 1.28 +- 0.15 M.Y.

Evans, S.H. Jr.

1980-02-01T23:59:59.000Z

349

September 8, 2011, HSS/Union Focus Group Work Group Telecom - Meeting Overview and Action Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-12-11 Draft 09-12-11 Draft DRAFT Meeting Overview and Action Summary HSS/Union Focus Group Work Group Telecom September 8, 2011 Meeting Overview: Glenn Podonsky reflected on the HSS Focus Group's 5 year history and reported that 24 HSS/Union Focus group meetings have been held to date. He emphasized the value of the relationships that have been developed between HSS and the unions and the need to re-energize efforts and rally to move the ball forward in addressing worker health and safety concerns through the 5 Work Groups. He acknowledged the vital importance of worker health and safety training quality, portability and standardization, and the progress made over the past several

350

Low-Level Waste Disposal Facility Federal Review Group Manual  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP MANUAL REVISION 3 JUNE 2008 (This page intentionally left blank) Low-Level JVllsfe Disposal Fllcili~l' Federal Review Group il1allUlli Revision 3, June 200S Concurrence The Low-Level Waste Disposal Facility Federal Review Group Manual, Revision 3, is approved for use as of the most recent date below. Date Chair, Low-Level Waste Disposal Federal Review Group Andrew WalJo, 1II Deputy Director, Otlice of Nuclear Safety, Quality Assurance, and Environment Department of Energy OHlce of Health, Safety, and Security e C. WilJiams Associate Administrator for Infrastructure and Environment National Nuclear Security Administration Low-Level 'Vaste Disposal Facility Federal Review Group J1aJll/ai

351

HSS Work Group Leadership Meetings: Transition Elements | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Group Leadership Meetings: Transition Elements Work Group Leadership Meetings: Transition Elements HSS Work Group Leadership Meetings: Transition Elements Meeting Dates: November 13 - 15, 2012 This HSS Focus Group Work Group telecom was held with the Work Group Co-Leads to discuss change elements and strategic direction to support accelerated efforts to advancing progress, productivity and performance within each of the Work Groups. Although current roles within all of the Work Groups and Focus Group efforts remain the same, the addition of centralized leadership and oversight by representatives (2) of the Departmental Representative to the Defense Nuclear Facilities Safety Board are established. Meeting Summaries 851 Implementation Meeting Summary Strategic Initiatives Meeting Summary Workforce Retention Meeting Summary

352

Interagency Advanced Power Group, Solar Working Group: Meeting minutes  

SciTech Connect

This report is the minutes of the Solar Working group. The meeting was prompted by the Steering Group`s desire to resolve issues the Solar Working Group.

Not Available

1993-10-14T23:59:59.000Z

353

Trails Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Trails Working Group Trails Working Group Trails Working Group Our mission is to inventory, map, and prepare historical reports on the many trails used at LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The LANL Trails Working Group inventories, maps, and prepares historical reports on the many trails used at LANL. Some of these trails are ancient pueblo footpaths that continue to be used for recreational hiking today. Some serve as quiet and non-motorized alternatives between the Townsite and LANL or between technical areas. The Trails Working Group, established in December 2003, includes representatives from local citizen hiking groups, Los Alamos County, Forest Service, Park Service, Los Alamos National Laboratory and the NNSA Los

354

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Categorical Exclusion Determination 81: Categorical Exclusion Determination Solar Instructor Training Network - Midwest Provider CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Wisconsin Offices(s): Golden Field Office January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 27, 2012 CX-007879: Categorical Exclusion Determination Wasatch SunShot Streamlining and Simplifying Solar CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Utah Offices(s): Golden Field Office January 27, 2012 CX-007878: Categorical Exclusion Determination Texas Solar Collaboration to Streamline and Enable An Increase in Photovoltaic Capacity CX(s) Applied: A9, A11 Date: 01/27/2012

355

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2013 3, 2013 CX-010294: Categorical Exclusion Determination Building For Re-Roofing Project CX(s) Applied: B1.23, B2.1, B2.5 Date: 05/03/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010292: Categorical Exclusion Determination Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010291: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010289: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas

356

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-009047: Categorical Exclusion Determination New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009046: Categorical Exclusion Determination Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009007: Categorical Exclusion Determination Northeast Provider of Solar Photovoltaic Instructor Training CX(s) Applied: A9, A11, B5.16 Date: 08/08/2012 Location(s): New York Offices(s): Golden Field Office August 8, 2012 CX-009045: Categorical Exclusion Determination Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

357

Save Energy, Save Date Night | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Save Date Night Energy, Save Date Night Save Energy, Save Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy How can I participate? Follow these tips to save energy and money this Valentine's Day. Valentine's Day. For many couples, it means cards, flowers, and prix fixe candlelight dinners. It also means for many couples a hefty withdrawal at the ATM to express their love. Fortunately, there are ways to save money by saving energy - even during the date - so you can spend the money you save on the things that really matter to your sweetheart. Here are five easy tips for those couples out there who want to save energy, save

358

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-003179: Categorical Exclusion Determination Mentasta Traditional Council CX(s) Applied: A9, A11 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003178: Categorical Exclusion Determination Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003169: Categorical Exclusion Determination Mecklenburg County Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010 Location(s): Mecklenburg County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003167: Categorical Exclusion Determination South Boston Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010

359

Save Energy, Save Date Night | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu...

360

DOE Guidance-Setting Effective Date for New Hires  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this memorandum is to establish the Department of Energy's (DOE) policy for setting effective dates for newly hired employees and to ensure uniform application among DOE Headquarters...

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

MEMORANDUM TO: FILE DATE FROM: SUBJECT: I ALTERNATE NAME:  

Office of Legacy Management (LM)

yes, date contacted TYPE OF OPERATIkN ----------- 0 Research & Development' 0 Facility Type 0 Production scale tastinq Cl PiL'at Scale a Bench Scale Process a Theoretical...

362

Electron Physics Group Staff Page  

Science Conference Proceedings (OSTI)

... Electron Physics Group Staff. ... Jabez McClelland, Group Leader Jabez McClelland is the Group Leader of the CNST Electron Physics Group. ...

2013-07-26T23:59:59.000Z

363

TMS Group Savings Plus  

Science Conference Proceedings (OSTI)

A money-saving group discount on auto and homeowners policies; Convenient payment plans Including automatic checking account deduction or direct home ...

364

Hydrogen Technologies Group  

DOE Green Energy (OSTI)

The Hydrogen Technologies Group at the National Renewable Energy Laboratory advances the Hydrogen Technologies and Systems Center's mission by researching a variety of hydrogen technologies.

Not Available

2008-03-01T23:59:59.000Z

365

Image Group Homepage  

Science Conference Proceedings (OSTI)

... The Group works to support the needs for Homeland Security Presidential Directive (HSPD)-12 and the Personal Identity Verification (PIV) card for ...

2013-07-16T23:59:59.000Z

366

Grid Integration Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Grid Integration Group The Demand Response Research Center (DRRC) conducts research that advances the near-term adoption of demand response (DR) technologies, policies, programs,...

367

Combustion Technologies Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Combustion Technologies Group Combustion research generates the fundamental physical and chemical knowledge on the interaction between flame and turbulence. Experimental and...

368

Electron Physics Group Homepage  

Science Conference Proceedings (OSTI)

... Group conducts wide ranging, cross-disciplinary research ... phenomenon known as spin transfer torque, a ... energy and generates heat, creating two ...

2012-07-20T23:59:59.000Z

369

Tribal Topic Group Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* Email information on Indian 101 course to Tribal Topic Group * Government panel at future TEC on impacts of broader hazmat transportation spectrum * Set up next conference...

370

1451 Group 0  

Science Conference Proceedings (OSTI)

... It defines a set of implementaition-independent application programming interface (API) as needed. Website: http://grouper.ieee.org/groups/1451/0/.

2013-06-27T23:59:59.000Z

371

LBNL Community Advisory Group  

NLE Websites -- All DOE Office Websites (Extended Search)

to search page 7 - Privacy policy 8 - Terms of use 9 - Go to contactcomment page LBNL Community Advisory Group: HOME CALENDAR FEEDBACK HOME About the Community Advisory...

372

Particle Data Group - Products  

NLE Websites -- All DOE Office Websites (Extended Search)

Group HOME: pdgLive Summary Tables Reviews, Tables, Plots Particle Listings Europe, Africa, Middle East, India, Pakistan, Russia and all other countries For copies of: ...

373

MEMS Test Working Group  

Science Conference Proceedings (OSTI)

... p2. Top view of cantilevers in in-plane length group. p1. Unconventional anchor design. Same anchor design as in thickness test structures. ...

2013-05-03T23:59:59.000Z

374

Standards Working Groups - Logistics  

Science Conference Proceedings (OSTI)

... group is to define practices and test methods related to the overall deployment procedures and constraints in place for emergency response. ...

2011-01-03T23:59:59.000Z

375

NERSC Users Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Policies Data Analytics & Visualization Science Gateways User Surveys NERSC Users Group Teleconferences Annual Meetings NUGEX Elections Charter User Announcements Help Operations...

376

Scientific Interest Groups  

NLE Websites -- All DOE Office Websites (Extended Search)

Catalysis High Pressure LiquidSoft-Matter Surface Scattering Powder Diffraction SAXS Surface & Interface Scattering XAS X-ray Micros.Imaging Scientific Interest Groups...

377

Contaminant Dating and Natural Recovery with Radioisotopes in Sediment  

Science Conference Proceedings (OSTI)

There are many reasons to conduct dated sediment core investigations. These include the site-specific analysis of sediment accumulation rates, natural and modern contaminant background concentrations, storm water effects, sediment stability, natural recovery, source identification, and recontamination potential. Environmental investigators use a limited number of radioisotopes for sediment dating, including 1) beryllium-7 for sediment deposition during the last year, 2) lead-210 and cesium-137 for sedime...

2011-12-21T23:59:59.000Z

378

/sup 137/Cs radioactive dating of Lake Ontario sediment cores  

SciTech Connect

The distribution of /sup 137/Cs in sediment cores from Lake Ontario provides estimates of the sediment accumulation rates. Geochronology with /sup 210/Pb dating and distribution of Ambrosia (ragweed) pollen compare well with /sup 137/Cs dating. These methods can determine with precision, changes in sedimentation occurring over the past 100 years or so. Typical sedimentation rates of 0.18-0.36 cm/yr were measured. 16 refs., 3 figs., 2 tabs.

Ward, T.E.; Breeden, J.; Komisarcik, K.; Porter, R.; Czuczwa, J.; Kaminski, R.; McVeety, B.D.

1987-12-01T23:59:59.000Z

379

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

380

Property:NEPA ApplicationDate | Open Energy Information  

Open Energy Info (EERE)

ApplicationDate ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate" Showing 25 pages using this property. (previous 25) (next 25) C CA-670-2010-107 + 17 December 2008 + D DOI-BLM-CA-ES-2013-002+1793-EIS + 17 February 2010 + DOI-BLM-ID-110-2009-3825-CE + 4 June 2009 + DOI-BLM-ID-220-2009-EA-3709 + 12 February 2009 + DOI-BLM-ID-I020-2012-0017-CX + 21 October 2011 + DOI-BLM-NM-L000-2012-0046-CX + 4 January 2012 + DOI-BLM-NV-B020-2008-0071-DNA + 21 February 2008 + DOI-BLM-NV-B020-2008-????-?? + 11 April 2008 + DOI-BLM-NV-B020-2008-????-CX + 29 September 2008 + DOI-BLM-NV-B020-2009-0030-CX + 11 December 2008 + DOI-BLM-NV-B020-2010-0106-CX + 15 December 2009 +

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Property:NEPA DecisionDocumentDate | Open Energy Information  

Open Energy Info (EERE)

DecisionDocumentDate DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the following 1 subproperty: D DOI-BLM-UT-W019-2011-0006-CX Pages using the property "NEPA DecisionDocumentDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 18 December 2007 + C CA-170-02-15 + 21 February 2002 + CA-650-2005-086 + 3 June 2006 + CA-670-2010-107 + 26 May 2010 + CA-670-2010-CX + 27 January 2010 + CA-96062042 + 31 May 2000 + D DOE-EA-1621 + 23 September 2008 + DOE-EA-1676 + 2 December 2009 + DOE-EA-1733 + 21 June 2010 + DOE-EA-1759 + 28 May 2010 + DOE-EA-1849 + 22 August 2011 + DOI-BLM-CA-C050-2009-0005-EA + 11 September 2009 +

382

Property:NEPA RevisedApplicationDate | Open Energy Information  

Open Energy Info (EERE)

RevisedApplicationDate RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA RevisedApplicationDate" Showing 19 pages using this property. D DOI-BLM-CA-ES-2013-002+1793-EIS + 5 June 2012 + DOI-BLM-NV-C010-2010-0006-EA + 16 November 2009 + DOI-BLM-NV-C010-2010-0010-EA + 15 October 2009 + DOI-BLM-NV-C010-2011-0016-EA + 15 March 2011 + DOI-BLM-NV-C010-2012-0050-EA + 14 February 2012 + DOI-BLM-NV-C010-2012-0051-EA + 1 December 2011 + DOI-BLM-NV-C010-2012-0069-CX + 9 August 2012 + DOI-BLM-NV-C010-2012-0070-CX + 27 July 2012 + DOI-BLM-NV-E030-2011-0017-CX + 2 March 2011 + DOI-BLM-NV-W010-2010-0004-EA + 23 November 2009 + DOI-BLM-NV-W010-2011-0001-EA + 4 June 2010 +

383

On A^1-fundamental groups of isotropic reductive groups.  

E-Print Network (OSTI)

We discuss A^1-fundamental groups of isotropic reductive groups. Using homotopy invariance of group homology in one variable, we identify the sections of A^1-fundamental group sheaves of an isotropic reductive group G over an infinite field k with the second homology group of the group G(k). This provides explicit loops representing elements in the A^1-fundamental groups.

Konrad Voelkel; Matthias Wendt

384

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conference Call Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group May 17, 2007 January 16, 2007 August 31,...

385

Interagency Working Groups (IWGs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

386

Steering Group Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Steering Steering Group Report Fermilab Director Pier Oddone convened the Fermilab Steering Group in March 2007. Members comprised particle and accelerator scientists from Fermilab and the national community. Fermilab Deputy Director Young-Kee Kim served as chair. The Steering Group subsequently formed subgroups to provide advice on the best physics opportunities that new facilities could offer. These subgroups drew upon university and laboratory scientists largely from outside Fermilab. The Steering Group took a number of steps to obtain as much input as possible from a broad spectrum of the U.S. particle- and accelerator-physics community. The Steering Group chair gave presentations and conducted town-hall-style sessions at meetings of all the major collaborations at Fermilab (CDF, DZero, MINOS, MINERνA,

387

Topic Group Participants  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Topic Group Report Topic Group Report Presented to: Transportation External Coordination Working Group April 5, 2005 Phoenix, Arizona Recent 180(c) Topic Group Activities Issue Papers 1. Funding Distribution Method 2. Allowable Activities 3. Definitions 4. Pass-Through Requirements 5. Contingency Plans 6. 180(c) Policy or Rulemaking 7. Timing and Eligibility* 8. Funding for Related Activities* 9. State Fees* 10. Funding Allocation Approach* 180(c) Policy & Procedures * Executive Summary * Draft Policy & Procedures * Draft Grant Application Pckg * Appendix *Papers 7-10 still under discussion Today's Discussion Items * Reviewed Topic Group member comments on a variety of issues * Key issues included: - Funding allocation and timing of grants - Planning grants - State fees/matching requirements - Related non-training activities

388

Chemical Reference Data Group Homepage  

Science Conference Proceedings (OSTI)

Chemical Reference Data Group. Welcome. The Chemical Reference Data Group compiles, evaluates, correlates and measures ...

2013-07-10T23:59:59.000Z

389

Multiplexed Biomolecular Science Group Homepage  

Science Conference Proceedings (OSTI)

Multiplexed Biomolecular Science Group. Welcome. The Multiplexed Biomolecular Science Group conducts research in ...

2012-10-06T23:59:59.000Z

390

Cyber Infrastructure Group Home Page  

Science Conference Proceedings (OSTI)

Cyber Infrastructure Group. Welcome. The Cyber Infrastructure Group (775.04) addresses the integration and interoperability ...

2012-07-17T23:59:59.000Z

391

NIST Laser Applications Group Homepage  

Science Conference Proceedings (OSTI)

Laser Applications Group. Welcome. The Laser Applications Group advances laser technology for applications in optical ...

2012-05-10T23:59:59.000Z

392

Multiplexed Biomolecular Science Group Staff  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Members of the Multiplexed Biomolecular Science Group. Dr. Marc Salit (Group Leader). Autumn ...

2012-10-06T23:59:59.000Z

393

SI Group Scheduling Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Personnel On-Call Page Beamline Validation Schedule Group Organizational Chart Reviews Presentations Group Scheduling Page Project Scheduling Information Ops Scheduling Info Project / Scheduling Info APS fy2005 Annual Schedule ( html ) PSS Validation Schedule APS fy2006 Annual Schedule (html) PSS Validation Teams Latest Machine Studies Schedule (pdf) (html) New Builds Schedule (For SI GROUP Reference Only) Parasitic Beam Operations Schedule Ops Scheduling Page Shutdown Information Work Schedules August/September Shutdown Shutdown Work List Validation Schedule Safety Info Work Request Links ISM Core Functions Enter / Search Work Requests APS Safety Page Modify / Approve Work Requests Radiation Safety Policy APS TMS Training Profiles MSDS Search This page maintained by Joe Budz

394

Fermilab Steering Group Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Steering Group Steering Group Eugene Beier University of Pennsylvania Joel Butler Fermi National Accelerator Laboratory Sally Dawson Brookhaven National Laboratory Helen Edwards Fermi National Accelerator Laboratory Thomas Himel Stanford Linear Accelerator Center Stephen Holmes Fermi National Accelerator Laboratory Young-Kee Kim, Chair Fermi National Accelerator Laboratory/ University of Chicago Andrew Lankford University of California, Irvine David McGinnis Fermi National Accelerator Laboratory Sergei Nagaitsev Fermi National Accelerator Laboratory Tor Raubenheimer Stanford Linear Accelerator Center Vladimir Shiltsev Fermi National Accelerator Laboratory Maury Tigner Cornell University Hendrik Weerts Argonne National Laboratory Contributors Neutrino Physics Group Eugene Beier University of Pennsylvania

395

Indoor Environment Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Indoor Environment Group Indoor Environment Group The Indoor Environment Group performs research that aims to maintain healthy and productive indoor environments while buildings are made more energy efficient. We study the links between indoor environmental quality, building ventilation, building energy efficiency and occupants' health, performance and comfort. We undertake experiments in laboratory and field settings and employ modeling to characterize indoor environmental conditions and evaluate the fate, transport and chemical transformations of indoor pollutants. We elucidate pathways of pollutant exposure, evaluate and develop energy efficient means of controlling indoor environmental quality, and provide input for related guidelines and standards. Contacts William Fisk WJFisk@lbl.gov (510) 486-5910

396

Group key management  

SciTech Connect

This report describes an architecture and implementation for doing group key management over a data communications network. The architecture describes a protocol for establishing a shared encryption key among an authenticated and authorized collection of network entities. Group access requires one or more authorization certificates. The implementation includes a simple public key and certificate infrastructure. Multicast is used for some of the key management messages. An application programming interface multiplexes key management and user application messages. An implementation using the new IP security protocols is postulated. The architecture is compared with other group key management proposals, and the performance and the limitations of the implementation are described.

Dunigan, T.; Cao, C.

1997-08-01T23:59:59.000Z

397

K-Ar dating of young volcanic rocks  

DOE Green Energy (OSTI)

Potassium-Argon (K-Ar) age dates were determined for forty-two young geologic samples by the Laboratory of Isotope Geochemistry, Department of Geosciences, in the period February 1, 1986 to June 30, 1989. Under the terms of Department of Energy Grant No. FG07-86ID12622, The University of Arizona was to provide state-of-the-art K-Ar age dating services, including sample preparation, analytical procedures, and computations, for forty-two young geologic samples submitted by DOE geothermal researchers. We billed only for forty samples. Age dates were determined for geologic samples from five regions with geothermal potential: the Cascade Mountains (Oregon); the Cascade Mountains (Washington); Ascension Island, South Atlantic Ocean; Cerro Prieto, Mexico; and Las Azufres, Mexico. The ages determined varied from 5.92 m.a. to 0.62 m.a. The integration of K-Ar dates with geologic data and the interpretation in terms of geologic and geothermal significance has been reported separately by the various DOE geothermal researchers. Table 1 presents a detailed listing of all samples dated, general sample location, researcher, researcher's organization, rock type, age, and probable error (1 standard deviation). Additional details regarding the geologic samples may be obtained from the respective geothermal researcher. 1 tab.

Damon, P.E.; Shafiqullah, M.

1991-01-31T23:59:59.000Z

398

Focus Group I  

NLE Websites -- All DOE Office Websites (Extended Search)

CARBON SEQUESTRATION - A COMMUNITY FOCUS GROUP STUDY OF CARBON SEQUESTRATION - A COMMUNITY FOCUS GROUP STUDY OF ATTITUDES IN WILLISTON, NORTH DAKOTA Sheila K. Hanson, Energy & Environmental Research Center Daniel J. Daly, Energy & Environmental Research Center Edward N. Steadman, Energy & Environmental Research Center John A. Harju, Energy & Environmental Research Center June 2005 EXECUTIVE SUMMARY In April 2005, representatives of the Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center (EERC) at the University of North Dakota, held two focus groups in Williston, North Dakota. A total of sixteen people participated; seven on April 20 and nine on April 21. The purpose of the focus group research was to gain insight into the public perception of carbon sequestration from

399

Security Topic Group  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Group Group Security and TEC * Tension exists between open forum concept of TEC and the ability of STG members to discuss security topics. - DOE will maintain the open forum - it will not form a subgroup of cleared members NAS Study * Some members want STG to formally recommend a fully independent review of security issues - DOE is reviewing the NAS study and has not formulated a position Security Topic Group (Continued) Classification Guide & Information Sharing Protocol * Guide is finished and undergoing internal concurrence - Slated for late September release * Protocol will be completed once the guide is issued Security-Related Lessons Learned * Lessons learned document was distributed and comments requested by the end of March Security Topic Group (Continued) SRG/CVSA Survey

400

Fermilab | Employee Advisory Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Phone Book Fermilab at Work Search Search Go Skip over navigation to main content EAG Home About the EAG EAG Members Questions and Answers Suggestions and Questions Focus Group...

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Ren Group - Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Ren Group Home Research Members Publications ContactsLinks NEWS Dec 15, 2012 Host an Electron Tomography Workshop with Peter Ercius at NCEM from Jan. 16-18th, 2013. Nov 20, 2012...

402

Particle Data Group - Authors  

NLE Websites -- All DOE Office Websites (Extended Search)

of Warwick, Coventry, CV4 7AL, UK Top B. Krusche Institute of Physics University of Basel CH-4056 Basel, Switzerland Top Yu. Kuyanov COMPAS Group IHEP Protvino, RU-142284...

403

File Groups at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

with another user "jimi", but does not want other members of bigsci to be able to see the data, the PI for Big Science could create a new group (for example, "ejdata", for elvis...

404

LBNL Community Advisory Group  

NLE Websites -- All DOE Office Websites (Extended Search)

page 1 - Go to home page 2 - Go to search page 7 - Privacy policy 8 - Terms of use 9 - Go to contactcomment page LBNL Community Advisory Group: HOME CALENDAR...

405

TEC Working Group Topic Groups Archives Training - Medical Training...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Summaries TEC Working Group Topic Groups Archives Training - Medical Training Meeting Summaries Meeting Summaries Philadelphia TEC Meeting, Topic Group Summary - July 1999...

406

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEC Working Group Topic Groups Rail Conference Call Summaries CONFERENCE CALL SUMMARIES Rail Topic Group Inspections Subgroup Planning Subgroup Tracking Subgroup TRAGIS Subgroup...

407

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRAGIS Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries TRAGIS Subgroup TRAGIS Subgroup April 11, 2006 More Documents & Publications TEC Working Group Topic...

408

TEC Working Group Topic Groups Rail Key Documents Intermodal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Intermodal Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup Intermodal Subgroup Draft Work Plan More Documents & Publications TEC Working Group Topic...

409

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2009 August 5, 2009 CX-000510: Categorical Exclusion Determination Isolation of Domestic and Fire Water Lines, 710-B CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000507: Categorical Exclusion Determination Building. 728-N Cut and Grout Domestic Water and Plant Air Lines CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000508: Categorical Exclusion Determination Electrical Isolation of Building 710-B CX(s) Applied: B4.10 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009

410

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 CX-006533: Categorical Exclusion Determination Installation of Retail Biofuel Fueling Infrastructure CX(s) Applied: A1, B5.1 Date: 08/25/2011 Location(s): Byron, Georgia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 25, 2011 CX-006516: Categorical Exclusion Determination Carolina Blue Skies Initiative CX(s) Applied: A1, B5.1 Date: 08/25/2011 Location(s): Durham, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 25, 2011 CX-006515: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7 Date: 08/25/2011 Location(s): Lincoln, Nebraska Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

411

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 13, 2013 March 13, 2013 CX-010162: Categorical Exclusion Determination Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration March 12, 2013 CX-010558: Categorical Exclusion Determination University of California Santa Cruz- Adiabatic Waveguide Coupler for High-Power Solar Energy Collection, Photovoltaic Conversion and Transmission CX(s) Applied: B3.6 Date: 03/12/2013 Location(s): California, California, California, California, Colorado Offices(s): Advanced Research Projects Agency-Energy March 12, 2013 CX-010132: Categorical Exclusion Determination 235-F Risk Reduction and Deactivation CX(s) Applied: B1.28 Date: 03/12/2013 Location(s): South Carolina

412

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-007736: Categorical Exclusion Determination Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy December 7, 2011 CX-007407: Categorical Exclusion Determination Advanced Floating Turbine CX(s) Applied: A9 Date: 12/07/2011 Location(s): Ohio Offices(s): Golden Field Office December 7, 2011 CX-007403: Categorical Exclusion Determination State of New Hampshire Energy Efficiency and Conservation Block Grant CX(s) Applied: B5.19 Date: 12/07/2011 Location(s): New Hampshire Offices(s): Golden Field Office December 7, 2011 CX-007401: Categorical Exclusion Determination

413

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-002796: Categorical Exclusion Determination Clean Cities Transportation Sector Petroleum Reduction Technologies Program CX(s) Applied: B5.1 Date: 06/23/2010 Location(s): Naples, Utah Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 23, 2010 CX-002792: Categorical Exclusion Determination Massachusetts-City-Taunton CX(s) Applied: B1.32, B2.5, A9, A11, B5.1 Date: 06/23/2010 Location(s): Taunton, Massachusetts Office(s): Energy Efficiency and Renewable Energy June 22, 2010 CX-003027: Categorical Exclusion Determination The Replacement of PacifiCorp?s Kennewick ? Dayton Hilltop Microwave Communication Equipment CX(s) Applied: B1.7, B4.6 Date: 06/22/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration

414

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005656: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Flint, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005655: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Wakarusa, Indiana Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005653: Categorical Exclusion Determination Pilot-Scale Testing Evaluating the Effects of Bromine Additions on Continuous Mercury Monitors at Low Mercury Concentrations CX(s) Applied: A9, B3.6 Date: 04/28/2011

415

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2009 7, 2009 CX-001264: Categorical Exclusion Determination Energy Efficiency Retrofits CX(s) Applied: B2.5, B5.1 Date: 12/17/2009 Location(s): Aroostock, Maine Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001263: Categorical Exclusion Determination Hire a Consultant CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Livingston, Louisiana Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001255: Categorical Exclusion Determination Energy Efficiency (EE) and Conservation, Loan Program, EE Upgrades, and Update Traffic Lights CX(s) Applied: A1, A8, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Bridgeport, Connecticut Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001253: Categorical Exclusion Determination

416

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-005598: Categorical Exclusion Determination Demonstration of a Novel Synchrophasor-Based Situational Awareness System CX(s) Applied: A1, A11, B1.7, B3.6 Date: 04/11/2011 Location(s): Chattanooga, Tennessee Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory April 11, 2011 CX-005597: Categorical Exclusion Determination Extraction of Formation Water from Carbon Dioxide Storage CX(s) Applied: A9 Date: 04/11/2011 Location(s): Grand Forks, North Dakota Office(s): Fossil Energy, National Energy Technology Laboratory April 11, 2011 CX-005596: Categorical Exclusion Determination Carolina Blue Skies Initiative CX(s) Applied: A1, B5.1 Date: 04/11/2011 Location(s): Greensboro, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy

417

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8004: Categorical Exclusion Determination 8004: Categorical Exclusion Determination Siting, Construction, Modifying, and Operating Small-Scale Structures CX(s) Applied: B1.15 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office November 28, 2011 CX-007758: Categorical Exclusion Determination Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): Illinois Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007757: Categorical Exclusion Determination Multipurpose Target Chamber for High-Temperature Ion Irradation - University of Tennessee CX(s) Applied: B3.10 Date: 11/28/2011 Location(s): Tennessee Offices(s): Nuclear Energy, Idaho Operations Office

418

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2013 2, 2013 CX-011107: Categorical Exclusion Determination High Efficiency Thin Film Fe2SiS4 and Fe2GeS4-based Cells Prepared from Low-Cost Solution CX(s) Applied: B3.6 Date: 08/12/2013 Location(s): Delaware Offices(s): Golden Field Office August 12, 2013 CX-010883: Categorical Exclusion Determination PHX-LOB and LIB-LOB 230-Kilovolt Double-Circuit- Replace Insulators at Structure No. 28-2 With NCI Type Polymers CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region August 12, 2013 CX-010802: Categorical Exclusion Determination Building 19 Mezzanine Demolition Project CX(s) Applied: B1.23 Date: 08/12/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory August 12, 2013

419

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-008208: Categorical Exclusion Determination Renewable Energy and Energy Efficiency Revolving Loan Program - Andreola Farms, Incorporated CX(s) Applied: B5.18 Date: 03/27/2012 Location(s): Nevada Offices(s): Golden Field Office March 26, 2012 CX-008164: Categorical Exclusion Determination Captain Jack-Olinda RAS LLL/LT Replacement Project CX(s) Applied: B1.31 Date: 03/26/2012 Location(s): California Offices(s): Bonneville Power Administration March 26, 2012 CX-008207: Categorical Exclusion Determination Field Evaluation and Validation of Remote Wind Sensing Technologies - Shore-Based and Buoy Mounted Light LIDAR Systems CX(s) Applied: A9, A11, B3.1, B3.16 Date: 03/26/2012 Location(s): New Jersey Offices(s): Golden Field Office March 26, 2012 CX-008206: Categorical Exclusion Determination

420

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2009 23, 2009 CX-000204: Categorical Exclusion Determination Manufacturing Industrial Development for the Alternative Energy Systems CX(s) Applied: A9, A11 Date: 11/23/2009 Location(s): Ann Arbor, Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000203: Categorical Exclusion Determination Health Lab Heat Recovery CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): South Dakota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000202: Categorical Exclusion Determination Energy Efficiency and Renewable Energy in Schools CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000201: Categorical Exclusion Determination

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-003040: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: A1, A7, B5.1 Date: 07/13/2010 Location(s): Pickens, South Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory July 13, 2010 CX-003039: Categorical Exclusion Determination High Temperature Chemical Sensors for Energy Research CX(s) Applied: B3.6 Date: 07/13/2010 Location(s): San Antonio, Texas Office(s): Fossil Energy, National Energy Technology Laboratory July 13, 2010 CX-003038: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7, B5.1 Date: 07/13/2010 Location(s): Omaha, Nebraska Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory July 13, 2010

422

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 CX-009331: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations Phase II CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): New Jersey Offices(s): National Energy Technology Laboratory September 26, 2012 CX-009433: Categorical Exclusion Determination Center for Biomass Utilization Renewal of Grant CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): North Dakota, Minnesota Offices(s): Golden Field Office September 25, 2012 CX-009242: Categorical Exclusion Determination Development of Light Water Reactor Fuels with Enhanced Accident Tolerance - AREVA Federal Services LLC CX(s) Applied: B3.6, B3.15 Date: 09/25/2012 Location(s): Florida, Wisconsin Offices(s): Nuclear Energy September 25, 2012 CX-009241: Categorical Exclusion Determination

423

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2012 19, 2012 CX-009638: Categorical Exclusion Determination Replacement, Removal, and Closure of Underground Storage Tanks CX(s) Applied: B2.5, B6.1 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009637: Categorical Exclusion Determination Removing Items or Materials Containing Polychlorinated Biphenyls CX(s) Applied: B1.17 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009636: Categorical Exclusion Determination Ventilation Activities CX(s) Applied: B1.4, B1.16, B2.1, B2.3 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009544: Categorical Exclusion Determination

424

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-008298: Categorical Exclusion Determination Clean Start - Development of a National Liquid Propane Refueling Network CX(s) Applied: B5.22 Date: 04/27/2012 Location(s): California, Indiana Offices(s): National Energy Technology Laboratory April 27, 2012 CX-008297: Categorical Exclusion Determination Characterization of Most Promising Carbon Capture and Sequestration Formations CX(s) Applied: B3.1 Date: 04/27/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory April 27, 2012 CX-008296: Categorical Exclusion Determination Evaluation of Solid Sorbents as a Retrofit Technology for Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 04/27/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory April 27, 2012 CX-008295: Categorical Exclusion Determination

425

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008531: Categorical Exclusion Determination Energize Missouri Homeowners Upgrades and Geothermal Jura CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office May 23, 2012 CX-008530: Categorical Exclusion Determination Energize Missouri Homeowners Upgrades and Geothermal Carlson CX(s) Applied: B5.1, B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office May 23, 2012 CX-008710: Categorical Exclusion Determination Amendment Number 1 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 05/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration May 23, 2012 CX-008743: Categorical Exclusion Determination Upgrading Lanthanide & Actinide Spectroscopy Capabilities at Washington

426

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 CX-001968: Categorical Exclusion Determination Development of Energy Efficiency and Conservation Strategy CX(s) Applied: A9, A11, B5.1 Date: 04/26/2010 Location(s): Box Elder County, Utah Office(s): Energy Efficiency and Renewable Energy April 26, 2010 CX-001813: Categorical Exclusion Determination Lean Gasoline System Development for Fuel Efficient Small Cars (Milford) CX(s) Applied: B3.6, A9 Date: 04/26/2010 Location(s): Milford, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 26, 2010 CX-002020: Categorical Exclusion Determination Energy Efficiency Retrofits for Anaconda's Antique Street Lights CX(s) Applied: B2.5, B5.1 Date: 04/26/2010 Location(s): Anaconda, Montana Office(s): Energy Efficiency and Renewable Energy

427

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 4, 2012 June 4, 2012 CX-008633: Categorical Exclusion Determination Dismantlement and Removal of 321-M Solvent Storage Tank Area Dynamic Underground Stripping (DUS I) Remnants CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 4, 2012 CX-008632: Categorical Exclusion Determination Sampling of Soil Vapor Extraction Wells at the Western Sector Dynamic Underground Stripping System CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 4, 2012 CX-008482: Categorical Exclusion Determination Composite Riser for Ultra-Deepwater High Pressure Wells CX(s) Applied: A9, A11 Date: 06/04/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory June 4, 2012

428

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-001991: Categorical Exclusion Determination Northern New Mexico College - El Rito Campus CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-001990: Categorical Exclusion Determination Highlands University CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): Las Vegas, New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000926: Categorical Exclusion Determination "Feedstock to Tailpipe Initiative": Kansas Biofuels Production, Testing and Certification Laboratory CX(s) Applied: B3.6 Date: 02/22/2010 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010

429

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

883: Categorical Exclusion Determination 883: Categorical Exclusion Determination Green Industry Business Development CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Champaign, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001877: Categorical Exclusion Determination Joliet Junior College Facilities Building CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001833: Categorical Exclusion Determination Energy Efficiency Conservation Municipal Grants - ALASKA - Energy Efficiency and Conservation Block Grant CX(s) Applied: A9, A11, B5.1 Date: 04/20/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001768: Categorical Exclusion Determination

430

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003491: Categorical Exclusion Determination Fond du Lac Hydroelectric Project CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Fond du Lac, Minnesota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003487: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Dry Prong, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003484: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Bossier City, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003486: Categorical Exclusion Determination

431

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 CX-007886: Categorical Exclusion Determination Development of a 300°C, 200 level, 3C Fiber Optic Downhole Seismic Receiver Array for Surveying and Monitoring of Geothermal Reservoirs CX(s) Applied: A9, B3.6, B3.11 Date: 01/25/2012 Location(s): California Offices(s): Golden Field Office January 25, 2012 CX-007819: Categorical Exclusion Determination Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region January 25, 2012 CX-007596: Categorical Exclusion Determination Ohio Advanced Transportation Partnership CX(s) Applied: B5.23 Date: 01/25/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory January 24, 2012 CX-008675: Categorical Exclusion Determination

432

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 CX-001740: Categorical Exclusion Determination Berks County, Pennsylvania, Boiler Plant Improvements - American Recovery and Reinvestment Act-Energy Efficiency and Conservation Block Grant CX(s) Applied: B2.5, B5.1 Date: 03/30/2010 Location(s): Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 30, 2010 CX-001583: Categorical Exclusion Determination Dynamic Energy Consumption Management of Routing Telecom and Data Centers CX(s) Applied: A9 Date: 03/30/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 30, 2010 CX-001582: Categorical Exclusion Determination Regional Biomass Feedstock Partnership CX(s) Applied: A9 Date: 03/30/2010 Location(s): South Dakota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

433

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-006505: Categorical Exclusion Determination Clean Cities Transportation Sector Petroleum Reduction Project CX(s) Applied: A7 Date: 08/29/2011 Location(s): Salt Lake City, Utah Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 29, 2011 CX-006597: Categorical Exclusion Determination Vermont Biofuels Initiative: State Line Biofuels 09 CX(s) Applied: B5.1 Date: 08/29/2011 Location(s): North Bennington, Vermont Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 29, 2011 CX-006595: Categorical Exclusion Determination Routine Monitoring and Maintenance, Sherwood, Washington, Disposal Site CX(s) Applied: B1.3, B1.11, B3.1 Date: 08/29/2011 Location(s): Sherwood, Washington Office(s): Legacy Management

434

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7842: Categorical Exclusion Determination 7842: Categorical Exclusion Determination Energy Efficient Windows and Doors for City Owned Buildings CX(s) Applied: B5.1 Date: 11/28/2011 Location(s): Pennsylvania Offices(s): Energy Efficiency and Renewable Energy November 28, 2011 CX-008005: Categorical Exclusion Determination Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office November 28, 2011 CX-007509: Categorical Exclusion Determination Record of Categorical Exclusion for Use of RW Surge Line to Big Hill Anhydrite Pond for Raw Water Intake Structure Recycle CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office November 28, 2011 CX-008004: Categorical Exclusion Determination

435

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 CX-008626: Categorical Exclusion Determination Replace 607-6A Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008625: Categorical Exclusion Determination Abandonment of M-Area Oil Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008624: Categorical Exclusion Determination Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008623: Categorical Exclusion Determination Perform Thermal Analysis and Thermal Exposures (TG-DTA)

436

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-002268: Categorical Exclusion Determination From Sensing to Enhancing the Brain Processes CX(s) Applied: B3.12 Date: 02/25/2010 Location(s): Albuquerque, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office February 24, 2010 CX-006661: Categorical Exclusion Determination Repair Flowline at 83-AX-4 CX(s) Applied: B5.2, B5.4 Date: 02/24/2010 Location(s): Casper, Wyoming Office(s): RMOTC February 24, 2010 CX-001126: Categorical Exclusion Determination 183-2C Removal of Switchgear Cubicle CX(s) Applied: B4.10 Date: 02/24/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2010 CX-000907: Categorical Exclusion Determination Improved Design Tools for Surface Water and Standing Column Well Heat Pump

437

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005134: Categorical Exclusion Determination Provision of Funds to the Yakama Nation for the Purchase of Three Parcels of Property Along Reecer Creek CX(s) Applied: B1.25 Date: 01/28/2011 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration January 27, 2011 CX-005173: Categorical Exclusion Determination Roof Replacement/Repair, Gutters, and Downspouts CX(s) Applied: B5.1 Date: 01/27/2011 Location(s): Northampton County, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 27, 2011 CX-005127: Categorical Exclusion Determination Philadelphia (Pennsylvania): Energy Loan to Community Legal Services for the Erie Avenue Office CX(s) Applied: B5.1 Date: 01/27/2011 Location(s): Philadelphia, Pennsylvania

438

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2009 0, 2009 CX-000255: Categorical Exclusion Determination Kansas City Wichita CX(s) Applied: A9, A11, B5.1 Date: 12/20/2009 Location(s): Wichita, Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 20, 2009 CX-000254: Categorical Exclusion Determination California County San Bernardino CX(s) Applied: A9, A11, B5.1 Date: 12/20/2009 Location(s): San Bernardino County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 20, 2009 CX-000253: Categorical Exclusion Determination California County Monterey CX(s) Applied: A9, A11, B5.1 Date: 12/20/2009 Location(s): Monterey County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 20, 2009 CX-000252: Categorical Exclusion Determination

439

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-003718: Categorical Exclusion Determination Research for Developing Renewable Biofuels from Algae CX(s) Applied: B3.6 Date: 09/10/2010 Location(s): Nebraska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 10, 2010 CX-003696: Categorical Exclusion Determination Research and Development of a Low Cost Solar Thermal Collector CX(s) Applied: A9, B3.6 Date: 09/10/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 10, 2010 CX-003695: Categorical Exclusion Determination Baseload Electricity Solar Tower CX(s) Applied: A9, B3.6 Date: 09/10/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 9, 2010 CX-007171: Categorical Exclusion Determination

440

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2012 22, 2012 CX-008535: Categorical Exclusion Determination King County Biogas and Nutrient Reduction CX(s) Applied: A9 Date: 05/22/2012 Location(s): Washington Offices(s): Golden Field Office May 22, 2012 CX-008533: Categorical Exclusion Determination 45-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project) CX(s) Applied: B5.15 Date: 05/22/2012 Location(s): Oregon Offices(s): Golden Field Office May 21, 2012 CX-008732: Categorical Exclusion Determination Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade CX(s) Applied: B1.31 Date: 05/21/2012 Location(s): Idaho Offices(s): Idaho Operations Office

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003666: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 07/27/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 27, 2010 CX-003247: Categorical Exclusion Determination Alaska-Tribe-Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/27/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 27, 2010 CX-003503: Categorical Exclusion Determination Water and Energy Emergency End Use Demand Management Measures CX(s) Applied: A1, A9, A11, B5.1 Date: 07/27/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett

442

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2013 23, 2013 CX-010920: Categorical Exclusion Determination Advanced Catalytic Solvent for Carbon Dioxide (CO2) Capture CX(s) Applied: A9 Date: 09/23/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory September 20, 2013 CX-010931: Categorical Exclusion Determination Commercial Scale Carbon Dioxide (CO2) Injection and Optimization of Storage Capacity in the Southeastern United States CX(s) Applied: A9, B3.6 Date: 09/20/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory September 20, 2013 CX-010930: Categorical Exclusion Determination Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization CX(s) Applied: A9, B3.1 Date: 09/20/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

443

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-003227: Categorical Exclusion Determination Hidalgo County: Activity 11: Park Efficient Light Project American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant (S) CX(s) Applied: A9, A11, B5.1 Date: 08/05/2010 Location(s): County of Hidalgo, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 5, 2010 CX-003220: Categorical Exclusion Determination Hot Pot Project CX(s) Applied: A9, B3.1 Date: 08/05/2010 Location(s): Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 5, 2010 CX-003200: Categorical Exclusion Determination City of Lafayette Energy Efficiency Conservation Block Grant CX(s) Applied: B5.1 Date: 08/05/2010 Location(s): Lafayette, Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

444

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 26, 2009 October 26, 2009 CX-005544: Categorical Exclusion Determination Power Rate Formula for the Provo River Project of the Western Area Power Administration CX(s) Applied: B4.3 Date: 10/26/2009 Location(s): Colorado Office(s): Western Area Power Administration-Colorado River Storage Project Management Center October 26, 2009 CX-004629: Categorical Exclusion Determination Seneca Nation of New York Energy Efficiency and Conservation Strategies CX(s) Applied: A1, A9, A11 Date: 10/26/2009 Location(s): New York Office(s): Energy Efficiency and Renewable Energy October 26, 2009 CX-004628: Categorical Exclusion Determination Seneca Nation of New York Energy Efficiency and Conservation Programs for Buildings and Facilities CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 10/26/2009

445

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003487: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Dry Prong, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003484: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Bossier City, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003486: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Kenner, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003482: Categorical Exclusion Determination

446

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-004998: Categorical Exclusion Determination Pennsylvania-City-Bethlehem CX(s) Applied: A9, B2.5, B5.1 Date: 01/12/2011 Location(s): Bethlehem, Pennsylvania Office(s): Energy Efficiency and Renewable Energy January 12, 2011 CX-004995: Categorical Exclusion Determination New Mexico-City-Santa Fe CX(s) Applied: A1, B1.32, B2.5, B5.1 Date: 01/12/2011 Location(s): Santa Fe, New Mexico Office(s): Energy Efficiency and Renewable Energy January 12, 2011 CX-004989: Categorical Exclusion Determination Analytical Physics - Scanning Electron Microscope (SEM) CX(s) Applied: B3.6 Date: 01/12/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory January 12, 2011 CX-004980: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Michigan Green Fleets

447

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2010 25, 2010 CX-004445: Categorical Exclusion Determination Waste Treatment Plant Secondary Waste Radioactive Fluidized Bed Steam Reforming (Module A) CX(s) Applied: B3.6 Date: 10/25/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 25, 2010 CX-004349: Categorical Exclusion Determination Near Zero Carbon Footprint Energy Creation through Thermal Oxidation CX(s) Applied: A9, B3.6 Date: 10/25/2010 Location(s): Allentown, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 25, 2010 CX-004332: Categorical Exclusion Determination Geothermal Incentive Program - Old Lyme High School Geothermal CX(s) Applied: A9, B5.1 Date: 10/25/2010 Location(s): Old Lyme, Connecticut Office(s): Energy Efficiency and Renewable Energy, National Energy

448

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-005040: Categorical Exclusion Determination Induction Furnace Melting (Includes Graphite and Mold Prep) CX(s) Applied: B3.6 Date: 01/19/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory January 19, 2011 CX-005039: Categorical Exclusion Determination Development and Validation of a Gas-Fired Residential Heat Pump Water Heater CX(s) Applied: B3.6 Date: 01/19/2011 Location(s): Milwaukee, Wisconsin Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory January 19, 2011 CX-005038: Categorical Exclusion Determination Development and Validation of a Gas-Fired Residential Heat Pump Water Heater CX(s) Applied: B3.6 Date: 01/19/2011 Location(s): Erwin, Tennessee Office(s): Energy Efficiency and Renewable Energy, National Energy

449

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 6, 2012 February 6, 2012 CX-007851: Categorical Exclusion Determination Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards for Commercial Refrigeration Equipment CX(s) Applied: B5.1 Date: 02/06/2012 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy February 3, 2012 CX-007818: Categorical Exclusion Determination Weld Substation Control Building Heating, Ventilation and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 02/03/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region February 3, 2012 CX-007839: Categorical Exclusion Determination Minnesota -County - Carver CX(s) Applied: A9, A11, B2.5, B5.1 Date: 02/03/2012 Location(s): Minnesota Offices(s): Energy Efficiency and Renewable Energy

450

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008950: Categorical Exclusion Determination Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 08/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008949: Categorical Exclusion Determination Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations CX(s) Applied: A9, B3.6 Date: 08/13/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008884: Categorical Exclusion Determination Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 13, 2012 CX-008879: Categorical Exclusion Determination Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project

451

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004502: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant: Installation of Photovoltaic System to Serve County of Monterey Laurel Yard Facilities (Activity 1) CX(s) Applied: B5.1 Date: 11/19/2010 Location(s): County of Monterey, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004501: Categorical Exclusion Determination City of Anaheim CX(s) Applied: B5.1 Date: 11/19/2010 Location(s): Anaheim, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004500: Categorical Exclusion Determination Energy and Daylighting Demonstration & Assessment of Sunlight Responsive Thermochromic Window Systems CX(s) Applied: B3.6 Date: 11/19/2010

452

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-000602: Categorical Exclusion Determination Tillamook-Oceanside, 115-kilovolt Substation Interconnection CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration January 7, 2010 CX-000702: Categorical Exclusion Determination Mississippi - Energy Efficient Buildings: Building Energy Codes and Beyond Energy Codes CX(s) Applied: A1, A9, A11 Date: 01/07/2010 Location(s): Mississippi Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory January 7, 2010 CX-000703: Categorical Exclusion Determination Maryland - Clean Energy Economic Development Initiative (CEEDI) CX(s) Applied: A1, A9, A11, B1.4, B1.5, B1.15, B1.22, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 01/07/2010

453

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 0, 2012 CX-008625: Categorical Exclusion Determination Abandonment of M-Area Oil Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008624: Categorical Exclusion Determination Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008623: Categorical Exclusion Determination Perform Thermal Analysis and Thermal Exposures (TG-DTA) CX(s) Applied: B3.6 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008546: Categorical Exclusion Determination National Open-ocean Energy Laboratory

454

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-005695: Categorical Exclusion Determination Ann Arbor Wind Generator CX(s) Applied: A9 Date: 04/12/2011 Location(s): Ann Arbor, Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 12, 2011 CX-005693: Categorical Exclusion Determination Solazyme Integrated Biorefinery (SzIBR): Diesel Fuels from Heterotrophic Algae CX(s) Applied: A9, B3.6 Date: 04/12/2011 Location(s): Peoria, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 12, 2011 CX-005692: Categorical Exclusion Determination State Energy Program Illinois Green Industry Business Development and Large Customer Energy Efficiency Program CX(s) Applied: A9, A11, B5.1 Date: 04/12/2011 Location(s): Peoria, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

455

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000541: Categorical Exclusion Determination Checkout of StreamPro ADCP (Acoustic Doppler Current Profiler) Velocity Meter CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination

456

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2047: Categorical Exclusion Determination 2047: Categorical Exclusion Determination Irma Charing Cross Sidewalk Project American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Irmo, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001899: Categorical Exclusion Determination XLD Reject Reclamation CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001855: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant City of St. Petersburg - Commercial Energy Efficiency Audit Program CX(s) Applied: A9, A11, B5.1 Date: 04/20/2010 Location(s): St. Petersburg, Florida

457

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2013 15, 2013 CX-009906: Categorical Exclusion Determinatio Optimized Co-Processing of Algal Bio-Crude through a Petroleum Refinery CX(s) Applied: A9, B3.6, B5.15 Date: 01/15/2013 Location(s): California, New Mexico Offices(s): Golden Field Office January 15, 2013 CX-009860: Categorical Exclusion Determination Cost-Effective Treatment of Flowback and Produced Water via an Integrated Precipitative Supercritical Process CX(s) Applied: A9, A11, B3.6 Date: 01/15/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory January 15, 2013 CX-009859: Categorical Exclusion Determination Cost-Effective Treatment of Flowback and Produced Water via an Integrated Precipitative Supercritical Process CX(s) Applied: A9, A11 Date: 01/15/2013 Location(s): Kentucky Offices(s): National Energy Technology Laboratory

458

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2010 23, 2010 CX-004719: Categorical Exclusion Determination Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install) CX(s) Applied: B1.7 Date: 11/23/2010 Location(s): Louisiana Office(s): Strategic Petroleum Reserve Field Office November 23, 2010 CX-004592: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A9, A11, B3.6 Date: 11/23/2010 Location(s): Wooster, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory November 23, 2010 CX-004591: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A1, A9, A11 Date: 11/23/2010

459

Dating of major normal fault systems using thermochronology- An example  

Open Energy Info (EERE)

Dating of major normal fault systems using thermochronology- An example Dating of major normal fault systems using thermochronology- An example from the Raft River detachment, Basin and Range, western United States Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Dating of major normal fault systems using thermochronology- An example from the Raft River detachment, Basin and Range, western United States Details Activities (1) Areas (1) Regions (0) Abstract: Application of thermochronological techniques to major normal fault systems can resolve the timing of initiation and duration of extension, rates of motion on detachment faults, timing of ductile mylonite formation and passage of rocks through the crystal-plastic to brittle transition, and multiple events of extensional unroofing. Here we determine

460

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2010 8, 2010 CX-003698: Categorical Exclusion Determination Green Education CX(s) Applied: A1, A9, B1.2, B5.1 Date: 09/08/2010 Location(s): Maricopa, Arizona Office(s): Energy Efficiency and Renewable Energy September 8, 2010 CX-003681: Categorical Exclusion Determination Nanostructured Solar Cells CX(s) Applied: B3.6 Date: 09/08/2010 Location(s): Little Rock, Arkansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 8, 2010 CX-003782: Categorical Exclusion Determination Driscoll Substation Radio Tower and Antenna Installation CX(s) Applied: B1.19 Date: 09/08/2010 Location(s): Clatsop County, Oregon Office(s): Bonneville Power Administration September 8, 2010 CX-003780: Categorical Exclusion Determination Installation and Removal of Relays - Port Townsend Paper Company

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 CX-010181: Categorical Exclusion Determination Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, B.1.31 Date: 04/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory April 25, 2013 CX-010180: Categorical Exclusion Determination A Universal Combustion Model to Predict Premixed and Non-Premixed Turbulent Flames in Compression CX(s) Applied: A9 Date: 04/25/2013 Location(s): Other Location Offices(s): National Energy Technology Laboratory April 25, 2013 CX-010179: Categorical Exclusion Determination Modeling and Experimental Studies of Controllable Cavity Turbulent Jet Ignition CX(s) Applied: B3.6 Date: 04/25/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory April 25, 2013

462

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2010 8, 2010 CX-004521: Categorical Exclusion Determination County of Travis, Texas 700 Lavaca Street Building Retrofit Project CX(s) Applied: B5.1 Date: 11/18/2010 Location(s): County of Travis, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 18, 2010 CX-004517: Categorical Exclusion Determination Ohio Energy Gateway Fund CX(s) Applied: B5.1 Date: 11/18/2010 Location(s): Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 18, 2010 CX-004495: Categorical Exclusion Determination Sustainable Algal Biofuels Consortium CX(s) Applied: B3.6 Date: 11/18/2010 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 18, 2010 CX-004485: Categorical Exclusion Determination

463

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-008323: Categorical Exclusion Determination Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: A9 Date: 04/18/2012 Location(s): Nevada Offices(s): National Energy Technology Laboratory April 18, 2012 CX-008322: Categorical Exclusion Determination Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): California Offices(s): National Energy Technology Laboratory April 18, 2012 CX-008321: Categorical Exclusion Determination Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: B3.6, B5.1 Date: 04/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory

464

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2013 16, 2013 Anthracite/Total Orange/Black Transfer of Contact-Handled Transuranic Waste to Idaho National Laboratory for Processing and Shipment to Waste Isolation Pilot Plant CX(s) Applied: B1.30 Date: 07/16/2013 Location(s): New Mexico Offices(s): Los Alamos Site Office July 16, 2013 CX-010582: Categorical Exclusion Determination Spring Creek Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 16, 2013 CX-010581: Categorical Exclusion Determination Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 16, 2013 CX-010858: Categorical Exclusion Determination Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23

465

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2013 30, 2013 CX-010821: Categorical Exclusion Determination Manufacturing Process for Organic Light-Emitting Diode (OLED) Integrated Substrate CX(s) Applied: B3.6 Date: 07/30/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory July 30, 2013 CX-010771: Categorical Exclusion Determination Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) CX(s) Applied: B1.15 Date: 07/30/2013 Location(s): Idaho Offices(s): Nuclear Energy July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina

466

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2009 20, 2009 CX-000258: Categorical Exclusion Determination New York County Orange CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/20/2009 Location(s): Orange County, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 20, 2009 CX-000257: Categorical Exclusion Determination Maryland County Baltimore CX(s) Applied: A9, A11, B2.2, B5.1 Date: 12/20/2009 Location(s): Baltimore County, Maryland Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 20, 2009 CX-000256: Categorical Exclusion Determination Louisiana City Baton Rouge CX(s) Applied: A9, A11, B2.2, B3.6, B5.1 Date: 12/20/2009 Location(s): Baton Rouge, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 20, 2009 CX-000255: Categorical Exclusion Determination

467

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-004038: Categorical Exclusion Determination Lighting Retrofits at the Gallatin County Fairgrounds CX(s) Applied: B2.5, B5.1 Date: 09/23/2010 Location(s): Bozeman, Montana Office(s): Energy Efficiency and Renewable Energy September 23, 2010 CX-004037: Categorical Exclusion Determination Insulation of the Gallatin County Weed Shop CX(s) Applied: B2.1, B2.5, B5.1 Date: 09/23/2010 Location(s): Bozeman, Montana Office(s): Energy Efficiency and Renewable Energy September 23, 2010 CX-003948: Categorical Exclusion Determination Limited Prescribed Burning on the Hanford Site During Calendar Year 2010 CX(s) Applied: B1.3 Date: 09/23/2010 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office September 23, 2010

468

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-003881: Categorical Exclusion Determination Warr Acres Ground Source Heat Project With Heating, Ventilation and Air Conditioning (HVAC) Retrofit CX(s) Applied: B5.1 Date: 09/01/2010 Location(s): Warr Acres, Oklahoma Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 1, 2010 CX-003880: Categorical Exclusion Determination Energy Independent Agri-Business Outreach CX(s) Applied: A9, B5.1 Date: 09/01/2010 Location(s): Cortland County, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 1, 2010 CX-003863: Categorical Exclusion Determination Design and Demonstration of an Advanced Agricultural Feedstock Supply System for Lignocellulosic Bioenergy Production CX(s) Applied: A9, B3.6, B5.1 Date: 09/01/2010

469

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-003285: Categorical Exclusion Determination Advanced Magnetic Refrigerant Materials CX(s) Applied: B3.6 Date: 08/09/2010 Location(s): Ashburn, Virginia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 9, 2010 CX-003284: Categorical Exclusion Determination Advanced Magnetic Refrigerant Materials CX(s) Applied: B3.6, B5.1 Date: 08/09/2010 Location(s): Niskayuna, New York Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 9, 2010 CX-003283: Categorical Exclusion Determination Advanced Magnetic Refrigerant Materials CX(s) Applied: B3.6 Date: 08/09/2010 Location(s): Louisville, Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

470

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-004139: Categorical Exclusion Determination Oklahoma-County-Tulsa CX(s) Applied: A9, A11, B1.32, B5.1 Date: 10/05/2010 Location(s): Tulsa County, Oklahoma Office(s): Energy Efficiency and Renewable Energy October 5, 2010 CX-004073: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant - Geothermal Energy Demonstration for Organic Produce Packing Facility CX(s) Applied: B5.1 Date: 10/05/2010 Location(s): Scott County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 5, 2010 CX-004072: Categorical Exclusion Determination City of Sisseton CX(s) Applied: B5.1 Date: 10/05/2010 Location(s): Sisseton, South Dakota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 5, 2010

471

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2013 15, 2013 CX-010034: Categorical Exclusion Determination Deactivation and Decommissioning of Soil Vapor Extraction Units CX(s) Applied: B1.23 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 15, 2013 CX-010033: Categorical Exclusion Determination Savannah River National Laboratory Electrolyzer 30 weight % Sulfuric Acid pH Adjustment CX(s) Applied: B3.6 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 15, 2013 CX-010032: Categorical Exclusion Determination Separation of the Minor Actinides from the Lanthanides with Magnetic Fields CX(s) Applied: B3.6 Date: 01/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 15, 2013 CX-009928: Categorical Exclusion Determination

472

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-003204: Categorical Exclusion Determination State Energy Program American Recovery and Reinvestment Act EE-0000169 CX(s) Applied: B5.1 Date: 08/03/2010 Location(s): Richmond, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 3, 2010 CX-004909: Categorical Exclusion Determination University of Notre Dame - Compact, Efficient Air Conditioning with Ionic Liquid Based Refrigerant CX(s) Applied: B3.6 Date: 08/03/2010 Location(s): LaGrange, Indiana Office(s): Advanced Research Projects Agency - Energy August 2, 2010 CX-007163: Categorical Exclusion Determination Pinnacle Peak-Prescott Access Road Improvement CX(s) Applied: B1.3 Date: 08/02/2010 Location(s): Yavapai County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

473

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2010 24, 2010 CX-004537: Categorical Exclusion Determination Energy Efficiency Conservation Block Grant - Wallace County Heat Pump CX(s) Applied: B5.1 Date: 11/24/2010 Location(s): Sharon Springs, Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 24, 2010 CX-004533: Categorical Exclusion Determination Solar Decathlon 2011: National Renewable Energy Laboratory Tracking Number 11-002 CX(s) Applied: B5.1 Date: 11/24/2010 Location(s): Washington, D.C. Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 24, 2010 CX-004560: Categorical Exclusion Determination Tennessee-County-Hamilton CX(s) Applied: A9, B2.5, B5.1 Date: 11/24/2010 Location(s): Hamilton County, Tennessee Office(s): Energy Efficiency and Renewable Energy

474

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82: Categorical Exclusion Determination 82: Categorical Exclusion Determination Commercial Renewable Energy Systems - Remington Arms Solar CX(s) Applied: A9, B5.1 Date: 04/01/2010 Location(s): Madison, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 1, 2010 CX-001400: Categorical Exclusion Determination Nye County Energy Efficiency Projects CX(s) Applied: A9, A11, B5.1 Date: 04/01/2010 Location(s): Nye County, Nevada Office(s): Energy Efficiency and Renewable Energy April 1, 2010 CX-001567: Categorical Exclusion Determination Lehigh County (Pennsylvania), Geothermal Trexler Environmental Center - American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant (S) CX(s) Applied: B5.1 Date: 04/01/2010 Location(s): Lehigh County, Pennsylvania

475

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2010 31, 2010 CX-003665: Categorical Exclusion Determination High Performance Buildings Program - Hawthorne Hotel CX(s) Applied: B5.1 Date: 08/31/2010 Location(s): Salem, Massachusetts Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 31, 2010 CX-003619: Categorical Exclusion Determination Advanced Technology Vehicle Manufacturing Project - Model S Manufacturing Facility CX(s) Applied: B1.31 Date: 08/31/2010 Location(s): Fremont, California Office(s): Advanced Technology Vehicles Manufacturing Loan Program August 30, 2010 CX-003641: Categorical Exclusion Determination Demolition and Recycling of the SIX Tesla Superconducting Dipole Magnet System CX(s) Applied: B3.6 Date: 08/30/2010 Location(s): DuPage County, Illinois Office(s): Science, Argonne Site Office

476

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2010 10, 2010 CX-004043: Categorical Exclusion Determination Pier 2 Project CX(s) Applied: B5.1 Date: 08/10/2010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 10, 2010 CX-003971: Categorical Exclusion Determination Bench Scale Process Development - In-Line Mixing Study CX(s) Applied: B3.6 Date: 08/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 10, 2010 CX-003632: Categorical Exclusion Determination Analysis of Evaporator Scale Sample CX(s) Applied: B3.6 Date: 08/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 10, 2010 CX-003631: Categorical Exclusion Determination Asbestos Removal in Spent Fuel Project (SFP) Facilities

477

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 CX-005205: Categorical Exclusion Determination Cleveland City American Recovery and Reinvestment Act-Energy Efficiency and Conservation Block Grant Act 2 (Cleveland Energy$aver Program) CX(s) Applied: A9, A11, B5.1 Date: 02/16/2011 Location(s): Cleveland, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 16, 2011 CX-005204: Categorical Exclusion Determination Renewable Energy Research and Development CX(s) Applied: A9 Date: 02/16/2011 Location(s): Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 16, 2011 CX-005203: Categorical Exclusion Determination Investigating the Performance of Residential Thermal Storage Refrigeration (TSR) CX(s) Applied: A9, B3.6 Date: 02/16/2011 Location(s): Davis, California

478

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2010 8, 2010 CX-002560: Categorical Exclusion Determination Energy Efficiency Retrofits CX(s) Applied: B2.2, B2.5, A1, B5.1 Date: 05/18/2010 Location(s): Covina, California Office(s): Energy Efficiency and Renewable Energy May 18, 2010 CX-002293: Categorical Exclusion Determination Characterization, Analysis and Simulation of Fine Coal Filtration Second Year of Two-Year Project CX(s) Applied: B3.6 Date: 05/18/2010 Location(s): Salt Lake City, Utah Office(s): Fossil Energy, National Energy Technology Laboratory May 18, 2010 CX-002292: Categorical Exclusion Determination Gas Heat Pump Cooperative Training Program (Nevada) CX(s) Applied: A9 Date: 05/18/2010 Location(s): Henderson, Nevada Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

479

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2010 January 5, 2010 CX-000802: Categorical Exclusion Determination Transmission Electron Microscopy Specimen Preparation by Electropolishing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000803: Categorical Exclusion Determination Production of Hazardous Enhanced Chemical Cleaning Sludge Simulants CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000804: Categorical Exclusion Determination 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

480

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2013 14, 2013 CX-010493: Categorical Exclusion Determination Determining Distribution Coefficients by Surface-Enhanced Raman Spectroscopy (SERS) CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010492: Categorical Exclusion Determination Permeation Testing Metals, Ceramics, and Polymers CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010282: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): New Jersey Offices(s): National Energy Technology Laboratory May 14, 2013 CX-010281: Categorical Exclusion Determination

Note: This page contains sample records for the topic "group submission date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Public Affairs Office: Livermore Lab Physicist Dates Lifetime of Solar  

NLE Websites -- All DOE Office Websites (Extended Search)

Dating the Solar System: Where Were You When the Solar System Was Being Formed? Dating the Solar System: Where Were You When the Solar System Was Being Formed? Chemistry & Materials Science Directorate, LLNL Chronology of the early Solar System from chondrule-bearing calcium-aluminium-rich inclusions Nature, April 21, 2005 Building Planets at PSI: The Origin of the Solar System Planetary Science Institute Social Media Logos Follow LLNL on YouTube Subscribe to LLNL's RSS feed Follow LLNL on Facebook Follow LLNL on Twitter Follow LLNL on Flickr Contact: Anne M. Stark Phone: (925) 422-9799 E-mail: stark8@llnl.gov FOR IMMEDIATE RELEASE April 20, 2005 NR-05-04-02 Livermore Lab physicist dates lifetime of solar nebula at two million years LIVERMORE, Calif. - The oxygen and magnesium content of some of the oldest objects in the universe are giving clues to the lifetime of the

482

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2011 12, 2011 CX-006468: Categorical Exclusion Determination Testing Subcontractor for Fenestration System Energy Performance Rating Development and Research CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006466: Categorical Exclusion Determination Deep/Shallow Well Laboratory CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office August 11, 2011 CX-006478: Categorical Exclusion Determination

483

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-003624: Categorical Exclusion Determination Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Gray's Harbor County, Washington Office(s): Bonneville Power Administration August 12, 2010 CX-004896: Categorical Exclusion Determination Davis Dam Switchyards (Erosion Control) CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region August 12, 2010 CX-003417: Categorical Exclusion Determination Energy Efficiency Projects CX(s) Applied: B5.1 Date: 08/12/2010 Location(s): Plover, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 12, 2010 CX-003405: Categorical Exclusion Determination

484

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 5, 2011 December 5, 2011 CX-007511: Categorical Exclusion Determination Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw Water Intake Structure CX(s) Applied: B1.3 Date: 12/05/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office December 5, 2011 CX-007789: Categorical Exclusion Determination Associated Electric Cooperative, Inc. Substation Improvements CX(s) Applied: B4.6 Date: 12/05/2011 Location(s): Missouri Offices(s): Southwestern Power Administration December 5, 2011 CX-007390: Categorical Exclusion Determination Hot Carrier Collection in Thin Film Silicon with Tailored Nanocrystalline/Amorphous Structure CX(s) Applied: B3.15, A9, B3.6 Date: 12/05/2011 Location(s): Colorado Offices(s): Golden Field Office December 5, 2011

485

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2009 2, 2009 CX-000393: Categorical Exclusion Determination Carbon Capture and Sequestration (by Enhanced Oil Recovery) Project Phase 1 CX(s) Applied: A1, A9, B3.1 Date: 11/12/2009 Location(s): Austin, Texas Office(s): Fossil Energy, National Energy Technology Laboratory November 12, 2009 CX-004894: Categorical Exclusion Determination Peacock Substation Washed Out Area Repair CX(s) Applied: B1.3 Date: 11/12/2009 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region November 12, 2009 CX-000394: Categorical Exclusion Determination Carbon Capture and Sequestration (by Enhance Oil Recovery) Project Phase 1 CX(s) Applied: A1, A9, B3.1 Date: 11/12/2009 Location(s): Texas City, Texas Office(s): Fossil Energy, National Energy Technology Laboratory

486

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 28, 2010 January 28, 2010 CX-000642: Categorical Exclusion Determination Recovery Act: North Little Rock Hydroelectric Department Hydroelectric Facility Improvement Project: Automated Intake Clearing Equipment and Material; Management CX(s) Applied: A9 Date: 01/28/2010 Location(s): North Little Rock, Arkansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 28, 2010 CX-000647: Categorical Exclusion Determination K-12 Energy Efficiency Project CX(s) Applied: B5.1 Date: 01/28/2010 Location(s): Idaho Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 28, 2010 CX-000651: Categorical Exclusion Determination Deployment of Innovative Energy Efficiency and Renewable Energy - Buildings CX(s) Applied: B5.1 Date: 01/28/2010

487

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-006404: Categorical Exclusion Determination Install a Pressure Regulator and Relief Valve on the Tank 26 Flush Water Piping CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006403: Categorical Exclusion Determination Enhanced Low Activity Waste Disposal Premix Silo Area Modifications CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006402: Categorical Exclusion Determination 704-N Wireless Access CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011

488

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-001295: Categorical Exclusion Determination B39 CASE Facility Upgrades CX(s) Applied: B1.15 Date: 03/22/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory March 22, 2010 CX-001487: Categorical Exclusion Determination Construction of Appledorn Substation CX(s) Applied: B4.11 Date: 03/22/2010 Location(s): Minnesota Office(s): Western Area Power Administration-Upper Great Plains Region March 22, 2010 CX-001294: Categorical Exclusion Determination Heavy-Duty Natural Gas Drainage Truck Replacement Program in the South Coast Air Basin CX(s) Applied: A7, A9, A11 Date: 03/22/2010 Location(s): Los Angeles, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 22, 2010 CX-007040: Categorical Exclusion Determination

489

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2012 22, 2012 CX-007925: Categorical Exclusion Determination Severe Environment Corrosion and Erosion Research Facility CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007924: Categorical Exclusion Determination Developing Next Generation High Power Batteries CX(s) Applied: B5.1 Date: 02/22/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007824: Categorical Exclusion Determination Bettis Atomic Power Laboratory- MRTC Office Building CX(s) Applied: B1.15 Date: 02/22/2012 Location(s): CX: none Offices(s): Naval Nuclear Propulsion Program February 22, 2012 CX-007901: Categorical Exclusion Determination Improving Atmospheric Models for Offshore Wind Resource Mapping and

490

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2012 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration February 1, 2012 CX-007813: Categorical Exclusion Determination Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 02/01/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office February 1, 2012 CX-007952: Categorical Exclusion Determination Esperanza Roof Replacement CX(s) Applied: A1, B2.1, B5.1 Date: 02/01/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory February 1, 2012 CX-007951: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project

491

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 CX-008983: Categorical Exclusion Determination Heliostat System with Wireless Closed-Loop Control CX(s) Applied: B3.6 Date: 08/06/2012 Location(s): California Offices(s): Golden Field Office August 3, 2012 CX-009223: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Asbestos Removal Actions CX(s) Applied: B1.16 Date: 08/03/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office August 3, 2012 CX-009052: Categorical Exclusion Determination Remove the Highpoint VAMP ED-641000-IT-RISH-6097A From Service CX(s) Applied: B2.2 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 3, 2012 CX-009093: Categorical Exclusion Determination Knolls Laboratory Q14 Sprinkler System Upgrade Project

492

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2009 8, 2009 CX-000392: Categorical Exclusion Determination Texas Energy Gasification Project CX(s) Applied: A1, A9 Date: 12/08/2009 Location(s): Beaumont, Texas Office(s): Fossil Energy, National Energy Technology Laboratory December 8, 2009 CX-000820: Categorical Exclusion Determination Vacuum Induction Melting of Metals CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000818: Categorical Exclusion Determination Scanned Probe Microscopy Surface Analysis and Sample Preparation CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 7, 2009 CX-005086: Categorical Exclusion Determination

493

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 CX-010148: Categorical Exclusion Determination Merritt Radio Station Upgrade CX(s) Applied: B1.19 Date: 04/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 18, 2013 CX-010319: Categorical Exclusion Determination General Chemical Support Operations for NHS, HP CX(s) Applied: B3.6 Date: 04/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 18, 2013 CX-010554: Categorical Exclusion Determination Yale University- Power Generation from Waste Heat with Closed Loop Membrane-Based System CX(s) Applied: B3.6 Date: 04/18/2013 Location(s): Connecticut, Colorado Offices(s): Advanced Research Projects Agency-Energy April 17, 2013 CX-010188: Categorical Exclusion Determination Field Demonstration of a Novel Eco-Friendly Production Enhancement Process

494

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-008322: Categorical Exclusion Determination Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): California Offices(s): National Energy Technology Laboratory April 18, 2012 CX-008321: Categorical Exclusion Determination Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: B3.6, B5.1 Date: 04/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory April 18, 2012 CX-008320: Categorical Exclusion Determination Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): New York Offices(s): National Energy Technology Laboratory

495

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2010 4, 2010 CX-004959: Categorical Exclusion Determination Primus Power -Low Cost, High Performance, 50-Year Electrodes CX(s) Applied: B3.6 Date: 08/14/2010 Location(s): Alameda, California Office(s): Advanced Research Projects Agency - Energy August 14, 2010 CX-004957: Categorical Exclusion Determination General Compression, Inc. -Fuel-Free, Ubiquitous, Compressed Air Energy Storage CX(s) Applied: B3.6 Date: 08/14/2010 Location(s): Watertown, Massachusetts Office(s): Advanced Research Projects Agency - Energy August 14, 2010 CX-004953: Categorical Exclusion Determination Fluidic Inc. -Enhanced Metal-Air Energy Storage System CX(s) Applied: B3.6 Date: 08/14/2010 Location(s): Scottsdale, Arizona Office(s): Advanced Research Projects Agency - Energy August 14, 2010 CX-004941: Categorical Exclusion Determination

496

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-004740: Categorical Exclusion Determination Install Amonix Panels at National Solar Thermal Test Facility CX(s) Applied: B5.1 Date: 11/23/2010 Location(s): New Mexico Office(s): Sandia Site Office November 23, 2010 CX-004719: Categorical Exclusion Determination Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install) CX(s) Applied: B1.7 Date: 11/23/2010 Location(s): Louisiana Office(s): Strategic Petroleum Reserve Field Office November 23, 2010 CX-004592: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A9, A11, B3.6 Date: 11/23/2010 Location(s): Wooster, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory

497

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration March 12, 2010 CX-001147: Categorical Exclusion Determination Implementation of Process Simulation Tools and Temperature Control Methods for Metal Oxide Chemical Vapor Deposition Growth CX(s) Applied: B3.6 Date: 03/12/2010 Location(s): Somerset, New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 12, 2010 CX-001182: Categorical Exclusion Determination Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line CX(s) Applied: B1.13 Date: 03/12/2010 Location(s): Snohomish, Washington

498

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-002075: Categorical Exclusion Determination Replace Boiler at Municipal Building (City Hall) CX(s) Applied: B2.5, B5.1, A1 Date: 04/22/2010 Location(s): Burlington, North Carolina Office(s): Energy Efficiency and Renewable Energy April 22, 2010 CX-002074: Categorical Exclusion Determination Energy Sustainability and Special Projects Engineer CX(s) Applied: A9, A11, B5.1 Date: 04/22/2010 Location(s): Burlington, North Carolina Office(s): Energy Efficiency and Renewable Energy April 22, 2010 CX-002030: Categorical Exclusion Determination Solar Array and Charging Stations - Administration Building/Cathcart CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

499

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 CX-007470: Categorical Exclusion Determination State Energy Program - Green Communities Fund CX(s) Applied: A9, A11, B5.1 Date: 12/14/2011 Location(s): Georgia Offices(s): National Energy Technology Laboratory December 14, 2011 CX-007469: Categorical Exclusion Determination State Energy Program - Green Communities Fund CX(s) Applied: A9, A11, B5.1 Date: 12/14/2011 Location(s): Georgia Offices(s): National Energy Technology Laboratory December 13, 2011 CX-007418: Categorical Exclusion Determination Sidewalks to School CX(s) Applied: B1.13 Date: 12/13/2011 Location(s): South Carolina Offices(s): Golden Field Office December 13, 2011 CX-007827: Categorical Exclusion Determination City of Palmer Retrofit Interior Energy Efficient Lighting Orihect CX(s) Applied: B5.1

500

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 CX-005444: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant: Electric and Hybrid Vehicle Incremental Cost Recovery CX(s) Applied: B5.1 Date: 03/22/2011 Location(s): Fairfax County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 22, 2011 CX-005547: Categorical Exclusion Determination Specific Manufacturing Capability (SMC) Incinerator and Propane Tank System Removal CX(s) Applied: B1.23 Date: 03/22/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office March 22, 2011 CX-005440: Categorical Exclusion Determination Rhode Island Non-utility Scale Renewable Energy Program CX(s) Applied: B5.1 Date: 03/22/2011 Location(s): North Kingstown, Rhode Island Office(s): Energy Efficiency and Renewable Energy, National Energy