National Library of Energy BETA

Sample records for grounding upgrades secondary

  1. Ground-based near-IR observations of the secondary eclipse of CoRoT-2b

    E-Print Network [OSTI]

    Alonso, R; Kabath, P; Rabus, M

    2010-01-01

    We present the results of a ground-based search for the secondary eclipse of the 3.3 Mjup transiting planet CoRoT-2b. We performed near infrared photometry using the LIRIS instrument on the 4.2 m William Herschel Telescope, in the H and K_s filters. We monitored the star around two expected secondary eclipses in two nights under very good observing conditions. For the depth of the secondary eclipse we find in H-band a 3 sigma upper limit of 0.17%, whereas we detected a tentative eclipse with a depth of 0.16+-0.09% in the K_s-band. These depths can be translated into brightness temperatures of T_H<2250 K and T_{K_s} = 1890(+260-350) K, which indicate an inefficient re-distribution of the incident stellar flux from the planet's dayside to its nightside. Our results are in agreement with the CoRoT optical measurement (Alonso et al. 09) and with Spitzer 4.5 and 8 micron results (Gillon et al. 09c).

  2. Cyclotron Institute Upgrade Project

    SciTech Connect (OSTI)

    Clark, Henry; Yennello, Sherry; Tribble, Robert

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  3. Hydrocarbonaceous material upgrading method

    DOE Patents [OSTI]

    Brecher, Lee E.; Mones, Charles G.; Guffey, Frank D.

    2015-06-02

    A hydrocarbonaceous material upgrading method may involve a novel combination of heating, vaporizing and chemically reacting hydrocarbonaceous feedstock that is substantially unpumpable at pipeline conditions, and condensation of vapors yielded thereby, in order to upgrade that feedstock to a hydrocarbonaceous material condensate that meets crude oil pipeline specification.

  4. NSLS control system upgrade

    SciTech Connect (OSTI)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-12-31

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans.

  5. Energy Upgrade California

    Broader source: Energy.gov [DOE]

    The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified...

  6. Advanced Photon Source Upgrade Project

    ScienceCinema (OSTI)

    Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

    2013-04-19

    Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

  7. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  8. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, E.T.; Lin, M.S.

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  9. ISIS upgrades David Findlay

    E-Print Network [OSTI]

    McDonald, Kirk

    ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation, 12­14 January 2012, FNAL #12;2 ISIS World for research in the physical and life sciences National and international community of >2000 scientists -- ISIS

  10. Changes in measured lightning return stroke peak current after the 1994 National Lightning Detection Network upgrade 

    E-Print Network [OSTI]

    Wacker, Robert Scott

    1997-01-01

    Since a comprehensive upgrade of the US National Lightning Detection Network (NLDN) in 1994, the mean peak current of detected cloud-to-ground (CG) lightning flashes has decreased, the number of detected flashes has ...

  11. CRYOGENICS IN BEPCII UPGRADE.

    SciTech Connect (OSTI)

    JIA,L.; WANG,L.; LI,S.

    2002-07-22

    THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

  12. Common Industrial Lighting Upgrade Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is used to regulate the ongoing electricity provided to the lamp. COMMON INDUSTRIAL LIGHTING UPGRADE TECHNOLOGIES Due to the phase-out of the incandescent bulb and magnetic...

  13. Upgraded Coal Interest Group

    SciTech Connect (OSTI)

    Evan Hughes

    2009-01-08

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  14. Energy Efficiency Upgrades

    SciTech Connect (OSTI)

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

  15. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating Demand for...

  16. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating...

  17. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for...

    Energy Savers [EERE]

    "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production...

  18. Energy Efficiency Upgrades Help Build Better Neighborhoods |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the...

  19. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades May 14, 2015 12:30PM to 2:00PM EDT Learn more...

  20. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project Federal Project Director, SC-PSO Administrative Change Approved by Office, ou=DOE-PSO, email=aindelicato@pppl.gov, c=US Date: 2012.10.15 09:41:43 -04'00' #12;NSTX Upgrade Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  1. ISIS Project Upgrade Campus Community

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    ISIS Project Upgrade Campus Community Page Navigation Page | 1 Page navigation has changed in the ISIS Application. This document provides you with the new location of all your key Campus Community the Navigation Pagelets": ISIS.UML..EDU #12;

  2. LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...

    Energy Savers [EERE]

    LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

  3. Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time,...

  4. Status of TMX upgrade diagnostics construction

    SciTech Connect (OSTI)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-07-20

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan.

  5. EFITviewer UpgradesEFITviewer Upgrades MDSplus Event Management System

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Summation System. red values indicate an alarm condition. #12;Web Tool Upgrades · Different Signals may is automatic · Signal names saved in a file may be pasted into Web Tool fields · "Memory" of previous entries improved #12;#12;#12;Web Tools can overlay profiles #12;

  6. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    _____________________________ Manager, SC-PSO _____________________________ J. Makiel NSTX Upgrade Project Federal Project Director, SC-PSO Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  7. Automatic Software Upgrades for Distributed Systems

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-11-30

    Upgrading the software of long-lived, highly-available distributed systems is difficult. It is not possible to upgrade all the nodes in a system at once, since some nodes may be unavailable and halting the system for an ...

  8. Automatic Software Upgrades for Distributed Systems

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  9. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential...

  10. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrading More Documents & Publications Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Pathways for Algal Biofuels Bioenergy Technologies Office...

  11. The TCS Upgrade Impurity Control

    E-Print Network [OSTI]

    Washington at Seattle, University of

    field ne is the plasma density RMF is the RMF rotation frequency rs is the FRC's separatrix radius, A.Tankut, G.C. Vlases Redmond Plasma Physics Laboratory, University of Washington RPPL, University of the TCS upgrade #12;FRCs at RPPL · FRC's have potential to make near ideal reactor - linear, high beta

  12. Ground Water Ground Sky Sky Water Vegetation Ground Vegetation Water

    E-Print Network [OSTI]

    Chen, Tsuhan

    Bear Snow Vegetation RhinoWater Vegetation Ground Water Ground Sky Sky Rhino Water Vegetation Ground Vegetation Water Rhino Water Vegetation Ground Rhino Water Rhino Water Ground Ground Vegetation Water Rhino Vegetation Rhino Vegetation Ground Rhino Vegetation Ground Sky Rhino Vegetation Ground Sky

  13. Renewable Energy Opportunities at Yuma Proving Ground, Arizona

    SciTech Connect (OSTI)

    Orrell, Alice C.; Kora, Angela R.; Russo, Bryan J.; Williamson, Jennifer L.; Weimar, Mark R.; Gorrissen, Willy J.; Dixon, Douglas R.

    2010-06-30

    This document provides an overview of renewable resource potential at Yuma Proving Ground, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations.

  14. The FNAL Injector Upgrade Status

    SciTech Connect (OSTI)

    Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

    2012-05-14

    The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

  15. Canada's heavy oil, bitumen upgrading activity is growing

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

  16. MICHIGAN SWEEPS NEIGHBORHOODS WITH ENERGY UPGRADES | Department...

    Energy Savers [EERE]

    on supporting local businesses and employment. BetterBuildings for Michigan developed a sustainable market for energy efficiency upgrades and thousands of qualified professionals...

  17. Physics Motivation for NSTXPhysics Motivation for NSTX UpgradeUpgrade Jon Menard and Masa Ono

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Physics Motivation for NSTXPhysics Motivation for NSTX UpgradeUpgrade Jon Menard and Masa Ono NSTX CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep U Quebec #12;NSTXNSTX Physics Motivation ARIES-ST #12;NSTXNSTX Physics Motivation for NSTX Upgrade 3Fall 2009 NSTX Research Priorities: · Full

  18. Physics design of the NSTX UpgradePhysics design of the NSTX Upgrade Jon Menard, PPPL

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    engineering design of the upgrade, systematic free-boundary equilibrium calculations have been performedPhysics design of the NSTX UpgradePhysics design of the NSTX Upgrade Jon Menard, PPPL NSTX Program Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado

  19. Analysis Efforts Supporting NSTX Upgrades

    SciTech Connect (OSTI)

    H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

    2010-11-29

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  20. Potential Peak Load Reductions From Residential Energy Efficient Upgrades 

    E-Print Network [OSTI]

    Meisegeier, D.; Howes, M.; King, D.; Hall, J.

    2002-01-01

    the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades...

  1. MAST-Upgrade Advancing compact fusion sources

    E-Print Network [OSTI]

    MAST-Upgrade Advancing compact fusion sources #12;#12;The Mega Amp Spherical Tokamak (MAST) is the centrepiece of the UK's fusion research programme. It has led studies into the spherical tokamak, a compact to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first

  2. SQL Server 2014 Upgrade Technical Guide

    E-Print Network [OSTI]

    Chaudhuri, Surajit

    SQL Server 2014 Upgrade Technical Guide Writers: Ron Talmage, Richard Waymire, James Miller, Vivek, Larry Barnes, Pablo Ahumada Published: December 2014 Applies to: SQL Server 2014 Summary: This technical guide takes you through the essentials for upgrading SQL Server 2005, SQL Server 2008, and SQL Server

  3. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L.

    1998-03-12

    This SARP Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  4. CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES | Department of Energy

    Energy Savers [EERE]

    upgrade rebates through their utility, and the programs would provide an additional rebate for upgrades that achieved more than 15% energy savings. In Charleston, South...

  5. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

  6. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  7. Energy Efficiency Upgrades Help Retired Military Officers Save...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement...

  8. EECBG Success Story: Energy Efficiency Upgrades Part of Winning...

    Energy Savers [EERE]

    Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District...

  9. Capturing Energy Upgrades in the Real Estate Transaction | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capturing Energy Upgrades in the Real Estate Transaction Capturing Energy Upgrades in the Real Estate Transaction Because green building techniques and products may impact the...

  10. Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades...

    Office of Environmental Management (EM)

    Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades A photo of a residence. Energize Phoenix...

  11. Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Neighborhood Initiative Upgrades 100,000 Buildings, Saves 730 Million on Energy Bills Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings, Saves...

  12. Progress on ARRA-funded Facility & Capability Upgrades for the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARRA-funded Facility & Capability Upgrades for the Battery AbuseSafety Laboratory Progress on ARRA-funded Facility & Capability Upgrades for the Battery AbuseSafety Laboratory...

  13. Beam intensity upgrade at Fermilab

    SciTech Connect (OSTI)

    Marchionni, A.; /Fermilab

    2006-07-01

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  14. Energy Efficiency Through Lighting Upgrades

    SciTech Connect (OSTI)

    Kara Berst; Maria Howeth

    2010-06-01

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  15. Solid waste burial grounds interim safety analysis

    SciTech Connect (OSTI)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  16. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    KELLY, D.L.

    1998-11-18

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A Project Hanford Management Contract (PHMC) Performance Expectation exists to update, revise, and/or cancel seven onsite SARPS during FY 1999. It is the U.S. Department of Energy's desire that 100% of the SARPs (which existed at the beginning of the PHMC Contract) be upgraded, revised, and/or canceled by the end of the five year contract. This plan is a ''living'' document and is used as a management tool.

  17. Jefferson Lab awards upgrade contracts (Inside Business) | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsreleasesjefferson-lab-awards-upgrade-contracts Submitted: Friday, January 9...

  18. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul

    2013-02-28

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  19. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema (OSTI)

    Gibbson, Murray;

    2013-04-19

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  20. System and process for upgrading hydrocarbons

    SciTech Connect (OSTI)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  1. APS Upgrade: Meetings, Workshops & Reviews | Advanced Photon...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    dynamics across length scales - in real time, in 3-D, in a single experiment. At the heart of the APS Upgrade Project planning process is the development of a robust science...

  2. Improving the Software Upgrade Value Stream

    E-Print Network [OSTI]

    Ippolito, Brian

    This paper reports findings from a two-year study to identify Lean practices for deriving software requirements from aerospace system level requirements, with a goal towards improving the software upgrade value stream.

  3. Advanced Photon Source Upgrade Project - Energy

    ScienceCinema (OSTI)

    Gibson, Murray; Chamberlain, Jeff; Young, Linda

    2013-04-19

    An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

  4. Pacific DC Intertie Upgrade Project Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  5. Upgrade Your Refinery for Energy Conservation 

    E-Print Network [OSTI]

    Johnnie, D. H., Jr.; Klooster, H. J.

    1983-01-01

    Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test...

  6. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-12-09

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  7. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    SciTech Connect (OSTI)

    RODRIGUEZ,C.GOLOSKOKOV,I.FISHBONE,L.GOODEY,K.LOOMIS,M.CRAIN,B.JR.LARSEN,R.

    2003-07-18

    The success of reducing the risk of nuclear proliferation through physical protection and material control/accounting systems depends upon the development of an effective design that includes consideration of the objectives of the systems and the resources available to implement the design. Included among the objectives of the design are facility characterization, definition of threat, and identification of targets. When considering resources, the designer must consider funds available, rapid low-cost elements, technology elements, human resources, and the availability of resources to sustain operation of the end system. The Siberian Chemical Combine (SCC) is a multi-function nuclear facility located in the Tomsk region of Siberia, Russia. Beginning in 1996, SCC joined with the United States Department of Energy (US/DOE) Material Protection, Control, and Accounting (MPC&A) Program to develop and implement MPC&A upgrades for the Radiochemical, Chemical Metallurgical, Conversion, Uranium Enrichment, and Reactor Plants of the SCC. At the Radiochemical Plant the MPC&A design and implementation process has been largely completed for the Plutonium Storage Facility and related areas of the Radiochemical Plant. Design and implementation of upgrades for the Radiochemical Plant include rapid physical protection upgrades such as bricking up of doors and windows, and installation of security-hardened doors. Rapid material control and accounting upgrades include installation of modern balances and bar code equipment. Comprehensive MPC&A upgrades include the installation of access controls to sensitive areas of the Plant, alarm communication and display (AC&D) systems to detect and annunciate alarm conditions, closed circuit (CCTV) systems to assess alarm conditions, central and secondary alarm station upgrades that enable security forces to assess and respond to alarm conditions, material control and accounting upgrades that include upgraded physical inventory procedures, and destructive and nondestructive assay equipment to perform neutron and gamma measurements on nuclear materials in process or storage. These MPC&A upgrades have been in operation at the SCC Radiochemical Plant for between 2 and 3 years. The operational experience gained by SCC during this period is currently being evaluated by SCC and ''lessons learned'' will be considered both for continued operation of the Radiochemical Plant MPC&A systems and similar MPC&A systems that are currently being planned for other Plant Sites of the SCC.

  8. D0 Silicon Upgrade: Upgrade Piping Loads on Cleanroom Roof

    SciTech Connect (OSTI)

    Sakla, Steve; /Fermilab

    1995-08-28

    The proposed piping layout for the DO upgrade will run along the south wall of DAB. The cryogenic service pipe runs above the upper and lower cleanroom roofs and will need to be supported by the roofs beams. Calculations were done to determine the stresses in the I-beams created by the existing and additional loads due to the upgrade. Refer to drawing no. 3823.115-ME-317283 for drawings of the piping layout. Figure 1 shows the 'plan view' portion of this drawing. The weight of the individual lines were calculated in figure 2 assuming a pipe density of O.28 lbm/in{sup 3} for stainless steel (0.12% C) and a fluid density (assuming LN2 at 1 atm) of 0.03 lbm/in{sup 3}. The weights of the corrugated steel flooring, assembly hall feed cans, support beams, and roof hatch were also included in the analysis. These loads are calculated on pgs. 5-6. A floor load of 50 lbf/ft{sup 2} was also added in order to maintain the existing floor load limit in addition to the added piping loads. Measurements of the dimensions of the I-beams determined that the nominal sizes of the beams were W8 x 21 for the lower roof and W14 x 26 for the upper roof. Pipe lengths were determined from the drawing for each of the lines on pgs. 1-2 of the calculations (refer to all piping by line numbers according to figure 2). A total weight was calculated for lines 3-9 along the south wall and lines 1-2 running along the north wall of the lower cleanroom roof. To simplify the calculations these weights were assumed to be evenly distributed on the 5 I-beam supports of the lower cleanroom roof 2.5 feet in from the south wall. The stress analysis was done using FrameMac, a 2-D finite element program for the Macintosh. Beam 3 was not included in the analysis because it is structurally equivalent to beam 1. The program outputted maximum values for shear stress, bending stress, shear force, and moments in each of the beams analyzed. These values were then compared to the allowable stresses as per the specifications and codes stated in the AISC: Manual of Steel Construction. The stresses on the roof beams needed to be determined in a number of different places. The first was in the beam itself which included the flange and web sections. The second place was at the ends of the beams where the flanges were removed to make the perpendicular connections to the other beams on the lower roof. The final point was the framed beam connection which included the bolt analysis. FrameMac calculated stresses only for the beams which included the sections where the flanges were removed to make the end connections. To analyze the connections, the allowable bending and shear stresses were solved for allowable shear and moments. This was done because FrameMac does not have the capability to analyze the dimensions for the bolts and angles used in the connections were known and the program outputted values for reaction forces and moments at the ends of the beams. Multiplying the allowable shear stress for the bolts and angle connections by their respective areas gave the allowable shear force. The allowable moment for the angle connection was calculated by multiplying the section modulus of the angle by the allowable bending stress. These allowable loads are calculated on pgs. 7-8. The allowable and maximum calculated stresses by FrameMac are summarized in a table. In conclusion, the cleanroom roofs will be able to safely support the weight of the upgrade cryogenic piping, feed cans, corrugated flooring and a 50 lbf/ft{sup 2} floor load with the addition of diagonal braces at the ends of beams 1,2,3,4, and 8. The location and size of these diagonal braces are shown in fig. 4. Also, the piping supports and feed cans will all need to be placed directly above the I-beam supports. These supports will consist of unistrut structures that will be detailed and specified separate to this analysis. The output and input data from FrameMac and the drawings used in the analysis follow the calculation pages.

  9. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  10. Level-2 Calorimeter Trigger Upgrade at CDF

    SciTech Connect (OSTI)

    Flanagan, G.U.; /Purdue U.

    2007-04-01

    The CDF Run II Level-2 calorimeter trigger is implemented in hardware and is based on an algorithm used in Run I. This system insured good performance at low luminosity obtained during the Tevatron Run II. However, as the Tevatron instantaneous luminosity increases, the limitations of the current system due to the algorithm start to become clear. In this paper, we will present an upgrade of the Level-2 calorimeter trigger system at CDF. The upgrade is based on the Pulsar board, a general purpose VME board developed at CDF and used for upgrading both the Level-2 tracking and the Level-2 global decision crate. This paper will describe the design, hardware and software implementation, as well as the advantages of this approach over the existing system.

  11. Energy Upgrade of the Siam Photon Source

    SciTech Connect (OSTI)

    Rugmai, S.; Rujirawat, S.; Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P.

    2007-01-19

    The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

  12. Living Comfortably: A Consumer's Guide to Home Energy Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker...

  13. Sandia Lightning Early Warning Network: Digital-based upgrade

    SciTech Connect (OSTI)

    Boyd, G.M.

    1994-05-01

    This report describes the layout and operation of the recently upgraded Sandia Lightning Early Warning Network, which was upgraded from an analog-based to a digital-based telemetry system.

  14. Upgrading : an alternative approach towards housing reform in China

    E-Print Network [OSTI]

    He, Fang, 1956-

    1989-01-01

    The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

  15. Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades...

    Office of Environmental Management (EM)

    Your One Stop Shop for Energy Efficiency Upgrades Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades This is a presentation from Energy Impact Illinois posted on the...

  16. Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    564 Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time This Better Buildings case study from April 2011 focuses on grantee...

  17. Automatic Software Upgrades for Distributed Systems (PhD thesis)

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  18. Jefferson Lab's upgraded Free-Electron Laser produces first ligh...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Navy's goals and expectations and we expect no less from the upgraded FEL." The Free-Electron Laser upgrade project is funded by the Department of Defense's Office of...

  19. Systems integration and upgrade of an Engineering Flight Simulator 

    E-Print Network [OSTI]

    Alcorn, William Pleasant

    2002-01-01

    This thesis presents the system integration and upgrade of the Texas A&M Flight Mechanics Laboratory Engineering Flight Simulator (EFS). This upgrade replaced the previous EFS, a simplistic design that did not resemble an aircraft cockpit...

  20. The JLAB 12 GeV Energy Upgrade of CEBAF

    SciTech Connect (OSTI)

    Harwood, Leigh H.

    2013-12-01

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  1. Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation 

    E-Print Network [OSTI]

    Yang, Daegil

    2011-02-22

    to upgrade. This thesis demonstrates that electron beam (E-Beam) heavy oil upgrading, which uses unique features of E-Beam irradiation, may be used to improve conventional heavy oil upgrading. E-Beam processing lowers the thermal energy requirements and could...

  2. CMS: Present status, limitations, and upgrade plans

    SciTech Connect (OSTI)

    Cheung, H.W.K.; /Fermilab; ,

    2011-09-01

    An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

  3. ELECTRONICS UPGRADE OF HIGH RESOLUTION MASS SPECTROMETERS

    SciTech Connect (OSTI)

    Mcintosh, J; Joe Cordaro, J

    2008-03-10

    High resolution mass spectrometers are specialized systems that allow researchers to determine the exact mass of samples to four significant digits by using magnetic and electronic sector mass analyzers. Many of the systems in use today at research laboratories and universities were designed and built more than two decades ago. The manufacturers of these systems have abandoned the support for some of the mass spectrometers and parts to power and control them have become scarce or obsolete. The Savannah River National Laboratory has been involved in the upgrade of the electronics and software for these legacy machines. The Electronics Upgrade of High Resolution Mass Spectrometers consists of assembling high-end commercial instrumentation from reputable manufacturers with a minimal amount of customization to replace the electronics for the older systems. By taking advantage of advances in instrumentation, precise magnet control can be achieved using high resolution current sources and continuous feedback from a high resolution hall-effect probe. The custom equipment include a precision voltage divider/summing amplifier chassis, high voltage power supply chassis and a chassis for controlling the voltage emission for the mass spectrometer source tube. The upgrade package is versatile enough to interface with valve control, vacuum and other instrumentation. Instrument communication is via a combination of Ethernet and traditional IEEE-488 GPIB protocols. The system software upgrades include precision control, feedback and spectral waveform analysis tools.

  4. MAST Upgrade Advancing compact fusion sources

    E-Print Network [OSTI]

    MAST Upgrade Advancing compact fusion sources 4 1 Off) is the centrepiece of the UK's fusion programme. MAST has led studies into the spherical tokamak, a compact fusion research: · Make the case for a fusion Component Test Facility. · Add to the knowledge base for ITER

  5. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  6. Testing of FMI's Coal Upgrading Process

    SciTech Connect (OSTI)

    Vijay Sethi

    2009-03-21

    WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

  7. Recent advances in upgrading large pumps

    SciTech Connect (OSTI)

    Nolt, J.R. Jr.; Russell, G.J. [American Hydro Corp., York, PA (United States)

    1995-12-31

    The benefits of upgrading hydraulic turbines and pump/turbines via the installation of custom designed replacement runners has been well documented in recent years. The increased operating efficiency and capacity, and improved cavitation and operating characteristics of modern replacement runners bears strong testimony to the specialized design an manufacturing techniques developed by turbine manufacturers who specialize in the upgrade business. The integration of computerized design and manufacturing technologies has resulted in the production of turbine and pump/turbine runners with a quality level not approachable with traditional techniques. This same technology can have dramatic results when applied to the upgrade of large pumps. The energy utilized to operate large irrigation, storage and cooling water pumps represents a major cost to the owners of the pumps. The operation of a 25,000 horsepower pump through one irrigation season represents an energy cost of approximately $4,000,000 per year. An increase in efficiency of 2% could result in an energy cost savings of over $100,000 per year. Pump impellers are subject to cavitation and erosion damage which reduces pump efficiency and capacity and may require costly maintenance and repairs. When designed and manufactured using modern computerized methods, an upgraded impeller can operate cavitation free at higher capacities and efficiencies than the original design. The costs of pump operation and maintenance can be substantially reduced by the replacement of the impellers with impellers of modern, custom design.

  8. Structural analysis of fuel assembly clads for the Upgraded Transient Reactor Test Facility (TREAT Upgrade)

    SciTech Connect (OSTI)

    Ewing, T.F.; Wu, T.S.

    1986-01-01

    The Upgraded Transient Reactor Test Facility (TREAT Upgrade) is designed to test full-length, pre-irradiated fuel pins of the type used in large LMFBRs under accident conditions, such as severe transient overpower and loss-of-coolant accidents. In TREAT Upgrade, the central core region is to contain new fuel assemblies of higher fissile loadings to maximize the energy deposition to the test fuel. These fuel assemblies must withstand normal peak clad temperatures of 850/sup 0/C for hundreds of test transients. Due to high temperatures and gradients predicted in the clad, creep and plastic strain effects are significant, and the clad structural behavior cannot be analyzed by conventional linear techniques. Instead, the detailed elastic-plastic-creep behavior must be followed along the time-dependent load history. This paper presents details of the structural evaluations of the conceptual TREAT Upgrade fuel assembly clads.

  9. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  10. Upgrade of Fermilab/NICADD photoinjector laboratory

    SciTech Connect (OSTI)

    Piot, P.; Edwards, H.; /Fermilab; Huning, M.; /DESY; Li, J.; Tikhoplav, R.; /Rochester U.; Koeth, T.; /Rutgers U., Piscataway

    2005-05-01

    The Fermilab/NICADD photoinjector laboratory is a 16 MeV electron accelerator dedicated to beam dynamics and advanced accelerator physics studies. FNPL will soon be capable of operating at {approx} 40 MeV, after the installation of a high gradient TESLA cavity. In this paper we present the foreseen design for the upgraded facility along with its performance. We discuss the possibilities of using of FNPL as an injector for the superconducting module and test facility (SM&TF).

  11. NSTX Upgrade FDR Calculation Executive Summaries

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    performed to support the NSTX Upgrade design effort. Some, but not most, have been reviewed and signed.1.2 NSTXU-CALC-12-04-00 PF2 / PF3 Bolting, Bracket, and weld Stress P. Titus I.Zatz 1.1.2 NSTXU-CALC-12-05-00 PF4 and PF5 Support Analysis P. Titus I.Zatz 1.1.2 NSTXU-CALC-12-06-00 Aluminum Block (To Be Revised

  12. Low emittance upgrade for CANDLE project

    E-Print Network [OSTI]

    Zanyan, G S

    2015-01-01

    To improve the performance of CANDLE synchrotron light source and stay competitive with recently proposed low emittance upgrade programs in the world we have developed new low emittance lattices for CANDLE booster and storage ring. These lattices have been designed taking into account the new developments in magnet fabrication technology and the multi-bend achromat concept. The main design considerations, the linear and non-linear beam dynamics aspects of the modified lattices are presented.

  13. Steam-system upgrades | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren) Jumpand MaintenanceStationary Power ServicesSte.upgrades

  14. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  15. Electron-ion hybrid instability experiment upgrades to the Auburn Linear Experiment for Instability Studies

    SciTech Connect (OSTI)

    DuBois, A. M.; Arnold, I.; Thomas, E. Jr.; Tejero, E.; Amatucci, W. E.

    2013-04-15

    The Auburn Linear EXperiment for Instability Studies (ALEXIS) is a laboratory plasma physics experiment used to study spatially inhomogeneous flows in a magnetized cylindrical plasma column that are driven by crossed electric (E) and magnetic (B) fields. ALEXIS was recently upgraded to include a small, secondary plasma source for a new dual source, interpenetrating plasma experiment. Using two plasma sources allows for highly localized electric fields to be made at the boundary of the two plasmas, inducing strong E Multiplication-Sign B velocity shear in the plasma, which can give rise to a regime of instabilities that have not previously been studied in ALEXIS. The dual plasma configuration makes it possible to have independent control over the velocity shear and the density gradient. This paper discusses the recent addition of the secondary plasma source to ALEXIS, as well as the plasma diagnostics used to measure electric fields and electron densities.

  16. Ground water and energy

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    This national workshop on ground water and energy was conceived by the US Department of Energy's Office of Environmental Assessments. Generally, OEA needed to know what data are available on ground water, what information is still needed, and how DOE can best utilize what has already been learned. The workshop focussed on three areas: (1) ground water supply; (2) conflicts and barriers to ground water use; and (3) alternatives or solutions to the various issues relating to ground water. (ACR)

  17. Methods and apparatuses for preparing upgraded pyrolysis oil

    DOE Patents [OSTI]

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  18. Honeymoons Lead to Upgrades in Western Vermont | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    to make energy efficiency upgrades, offering them a honeymoon might just be the motivation they need. NeighborWorks of Western Vermont (NWWVT) created a "honeymoon period" for...

  19. EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

  20. BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy

    Energy Savers [EERE]

    upgrades. Program Design: Historically, Austin Energy customers had taken advantage of rebate-only offers more often than loan-only offers. Austin Energy's Best Offer Ever allowed...

  1. Conceptual design report for Project W-420, stack monitoring upgrade

    SciTech Connect (OSTI)

    Lott, D.T., Fluor Daniel Hanford

    1997-03-10

    This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

  2. California Member Connects Solar Adoption With Upgrades | Department...

    Energy Savers [EERE]

    adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies realize that partnering...

  3. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Approaches and Lessons Learned" on May 20, 2011 in Washington, D.C. What's Working in Residential Energy Efficiency Upgrade Programs More Documents & Publications Strategies...

  4. WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES | Department...

    Office of Environmental Management (EM)

    from the initial assessment through the completion of energy upgrades. They attended real estate events, home shows, and neighborhood events to promote energy efficiency. The...

  5. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2...

  6. Using QECBs for Street Lighting Upgrades: Lighting the Way to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revenue Service Qualified Energy Conservation Bonds Using Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia...

  7. Community based outreach strategies in residential energy upgrade programs

    E-Print Network [OSTI]

    McEwen, Brendan (Brendan Carl Francis)

    2012-01-01

    Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

  8. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expectations Better Buildings Residential Network Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations, March 27, 2014....

  9. Energy Upgrade California Drives Demand From Behind the Wheel...

    Broader source: Energy.gov (indexed) [DOE]

    trailer with the Energy Upgrade California logo and graphics painted on the side. With a goal of "energy efficiency or bust," the California Center for Sustainable Energy (CCSE)...

  10. EECBG Success Story: County Partners with Siemens on Energy Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the county government center, and a public...

  11. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Pathways for Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole...

  12. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion...

  13. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and...

  14. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore »port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less

  15. Secondary fuel delivery system

    DOE Patents [OSTI]

    Parker, David M. (Oviedo, FL); Cai, Weidong (Oviedo, FL); Garan, Daniel W. (Orlando, FL); Harris, Arthur J. (Orlando, FL)

    2010-02-23

    A secondary fuel delivery system for delivering a secondary stream of fuel and/or diluent to a secondary combustion zone located in the transition piece of a combustion engine, downstream of the engine primary combustion region is disclosed. The system includes a manifold formed integral to, and surrounding a portion of, the transition piece, a manifold inlet port, and a collection of injection nozzles. A flowsleeve augments fuel/diluent flow velocity and improves the system cooling effectiveness. Passive cooling elements, including effusion cooling holes located within the transition boundary and thermal-stress-dissipating gaps that resist thermal stress accumulation, provide supplemental heat dissipation in key areas. The system delivers a secondary fuel/diluent mixture to a secondary combustion zone located along the length of the transition piece, while reducing the impact of elevated vibration levels found within the transition piece and avoiding the heat dissipation difficulties often associated with traditional vibration reduction methods.

  16. The value of steam turbine upgrades

    SciTech Connect (OSTI)

    Potter, K.; Olear, D.

    2005-11-01

    Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

  17. The enhanced ASDEX Upgrade pellet centrifuge launcher

    SciTech Connect (OSTI)

    Plöckl, B.; Lang, P. T.

    2013-10-15

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  18. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  19. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    SciTech Connect (OSTI)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  20. TMX-Upgrade neutral-beam injection system

    SciTech Connect (OSTI)

    Felker, B.; Kane, R.J.; Wong, R.L.; Calderon, M.O.; Moore, T.L.

    1981-10-05

    The TMX experiment proved that axial confinement of central-cell ions is improved ninefold by the electrostatic potential of end-cell plasmas. The TMX Upgrade task is to improve this confinement further. This paper discusses the injector system aspects of the TMX Upgrade.

  1. Analysis and Qualification Documentation The NSTX Upgrade Team

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Upgrade Final Design Review (6/22/2011) 4 NSTX CSU Calculation Index Historically What is Available Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Center Stack Upgrade Final Design Review (6/22/2011) Overview · This presentation is an overview

  2. Health and Safety Plan for NSTX Upgrade Project Tasks

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

  3. Rebates Cut the Price of Big-Time Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy’s rebate programs that cut the cost of whole-house energy efficiency upgrades.

  4. Health and Safety Plan for NSTX Upgrade Project Tasks

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

  5. REPOWERING BAINBRIDGE AND BREMERTON WITH UPGRADES | Department...

    Broader source: Energy.gov (indexed) [DOE]

    community-specific website, and CSG employed a combination of print advertising, online ads, on-the-ground outreach (e.g., community-specific events, staffing a booth at the...

  6. Modern hydrocracking is the key to upgrading processes

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Hydrocracking technology is the key to Canada's heavy oil and bitumen upgrading facilities that have recently started or are due to start up during the next few years. The upgrader at Consumers' Cooperative Refineries Ltd. in Regina Sask.; the capacity addition program (CAP) at Syncrude Canada Ltd.'s Fort McMurray, Alta., plant; Husky Oil Operations Ltd.'s Bi-Provincial upgrader to be built near Lloydminster, Sask.; and the OSLO project to be built near Fort McMurray, all rely on this modern technology for primary upgrading. All of the projects are designed to upgrade heavy oil and bitumen extracted from oil sands to a high-quality synthetic crude oil (SCO) that is a blend of high-quality naphtha and gas oil.

  7. The 12 GeV Energy Upgrade at Jefferson Laboratory

    SciTech Connect (OSTI)

    Pilat, Fulvia C.

    2012-09-01

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  8. Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department...

    Energy Savers [EERE]

    Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of...

  9. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.; /SLAC

    2006-03-13

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx{reg_sign} ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  10. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-05-09

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  11. Steam turbine upgrading: low-hanging fruit

    SciTech Connect (OSTI)

    Peltier, R.

    2006-04-15

    The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

  12. Upgrading the TFTR Transrex Power Supplies

    SciTech Connect (OSTI)

    J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

    2009-05-29

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

  13. LLRF System for the CEBAF Separator Upgrade

    SciTech Connect (OSTI)

    Plawski, Tomasz E.; Bachimanchi, Ramakrishna; Hovater, J. Curt; Seidman, David J.; Wissmann, Mark J.

    2014-12-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  14. Upgraded HFIR Fuel Element Welding System

    SciTech Connect (OSTI)

    Sease, John D [ORNL

    2010-02-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  15. Renewable Energy Opportunties at Dugway Proving Ground, Utah

    SciTech Connect (OSTI)

    Orrell, Alice C.; Kora, Angela R.; Russo, Bryan J.; Horner, Jacob A.; Williamson, Jennifer L.; Weimar, Mark R.; Gorrissen, Willy J.; Nesse, Ronald J.; Dixon, Douglas R.

    2010-05-31

    This document provides an overview of renewable resource potential at Dugway Proving Ground, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and ground source heat pumps (GSHPs). The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment.

  16. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  17. Superconducting RF Lab Facility Upgrades at Los Alamos

    SciTech Connect (OSTI)

    Katonak, D.J.; Rusnak, B.

    1999-03-01

    Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

  18. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    SciTech Connect (OSTI)

    Gordon, John Howard

    2014-09-09

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  19. Achievements of the ATLAS Upgrade Planar Pixel Sensors R&D Project

    E-Print Network [OSTI]

    C. Nellist

    2014-11-20

    In the framework of the HL-LHC upgrade, the ATLAS experiment plans to introduce an all-silicon inner tracker to cope with the elevated occupancy. To investigate the suitability of pixel sensors using the proven planar technology for the upgraded tracker, the ATLAS Planar Pixel Sensor R&D Project (PPS) was established comprising 19 institutes and more than 90 scientists. The paper provides an overview of the research and development project and highlights accomplishments, among them: beam test results with planar sensors up to innermost layer fluences (> 10^16 n_eq cm^2); measurements obtained with irradiated thin edgeless n-in-p pixel assemblies; recent studies of the SCP technique to obtain almost active edges by postprocessing already existing sensors based on scribing, cleaving and edge passivation; an update on prototyping efforts for large areas: sensor design improvements and concepts for low-cost hybridisation; comparison between Secondary Ion Mass Spectrometry results and TCAD simulations. Together, these results allow an assessment of the state-of-the-art with respect to radiation-hard position-sensitive tracking detectors suited for the instrumentation of large areas.

  20. Cooking with Ground Pork 

    E-Print Network [OSTI]

    Anding, Jenna

    2008-12-09

    This fact sheet describes the nutritional value and safe storage of ground pork, a commodity food. It also offers food preparation ideas.

  1. Cooking with Ground Beef 

    E-Print Network [OSTI]

    Anding, Jenna

    2008-12-09

    This fact sheet describes the nutritional value and safe storage of ground beef, a commodity food. It also offers food preparation ideas.

  2. Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

  3. Webinar: Introduction to Better Buildings Home Upgrade Program Accelerator

    Broader source: Energy.gov [DOE]

    DOE recently launched the new Better Buildings Home Upgrade Program Accelerator that will focus on the adoption of HPXML and other process improvements to reduce administrative costs and improve...

  4. The run IIb trigger upgrade for the DO experiment

    E-Print Network [OSTI]

    Wilson, Graham Wallace; Padley, P.; Olsen, J.; Narain, M.; Mitrevski, J.; Le Du, P.; Laurens, P.; Johnson, M.; Johns, K.; Hirosky, R.; Hildreth, M.

    2004-06-01

    The increase in instantaneous luminosity anticipated in Run IIb of the Tevatron collider at Fermilab requires increased background rejection capabilities from the trigger system of the DO detector. A set of upgrades is under way to improve...

  5. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Broader source: Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  6. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Environmental Management (EM)

    Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for...

  7. Bedford Energizes Other Communities to Upgrade | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Jobs-Green New York Program. The state provided homeowners a 10% rebate on the total cost of the upgrades once completed. Workforce Development: Energize New York created the...

  8. Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  9. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Martha Jane Murray, Clinton Climate Initiative 11:00 a.m. - 12:30 p.m. Driving Demand for Residential Building Upgrades Moderator: David Weitz, Conservation Services...

  10. Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...

    Office of Environmental Management (EM)

    as adding insulation and motion sensors. As a result of the upgrades, the Tribe's electrical energy consumption is estimated to be reduced by 30%, thereby reducing the cost to...

  11. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003.g., useful in the COCONUT project for organizing points, where some of the properties change from work node

  12. Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation Streams to Hydrocarbons for Fungible Fuels 2.3.1.100 Chaitanya Narula, 1 Zhenglong Li, 1 E. Casbeer, 1 Robert A....

  13. Energy and Emissions Savings through Insulation Upgrade Projects 

    E-Print Network [OSTI]

    Lettich, M.

    2008-01-01

    The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental...

  14. Secondary emission gas chamber

    E-Print Network [OSTI]

    V. In'shakov; V. Kryshkin; V. Skvortsov

    2014-12-10

    For a hadron calorimeter active element there is considered a gaseous secondary emis-sion detector (150 micron gap, 50 kV/cm). Such one-stage parallel plate chamber must be a radiation hard, fast and simple. A model of such detector has been produced, tested and some characteristics are presented.

  15. Upgrade to the Birmingham Irradiation Facility

    E-Print Network [OSTI]

    Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

    2015-01-01

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 ?A and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

  16. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  17. LHCb : Tracking system of the LHCb upgrade

    E-Print Network [OSTI]

    Szumlak, Tomasz

    2015-01-01

    The upgrade of the LHCb experiment will run at an instantaneous luminosity of 2x10^33 cm^-2 s^-1 with a fully software based trigger, allowing to read out the detector at a rate of 40MHz. For this purpose, the full tracking system will be newly developed: the vertex locator (VELO) will be replaced by a pixel-based detector, withstanding the high radiation dose and providing an excellent track reconstruction with an efficiency of above 99% for all charged particles of interest. Upstream of the magnet, a silicon mico-strip detector with a high granularity and an improved acceptance coverage, called the Upstream Tracker (UT), will replace the current silicon strip tracker, and provide a rough momentum estimate. The tracking system downstream of the magnet will be replaced by the Scintillating Fibre tracker (SciFi), which will consist of 12 layers using 2.5m long scintillating fibres read out by silicon photo-multipliers, providing a spatial resolution better than 100 micron and resulting in a total momentum reso...

  18. Naphthene upgrading with pillared synthetic clay catalysts

    SciTech Connect (OSTI)

    Sharma, R.K.; Olson, E.S. [Univ. of North Dakota, Grand Forks, ND (United States)

    1995-12-31

    Catalytic hydrotreatment of methylcyclohexane was investigated to model upgrading of coal-derived naphthenes. Nickel-substituted synthetic mica montmorillonite (NiSMM), alumina-pillared NiSMM and Zirconia-pillared NiSMM were prepared and tested for hydrocracking and hydroisomerization of methylcyclohexane. Infrared and thermal desorption studies of the pyridine-adsorbed catalysts indicated the presence of Lewis and Bronsted acid sites. Total acidity and surface area increased with pillaring of NiSMM with polyoxy aluminum and polyoxy zirconium cations. Methylcyclohexane was reacted with these catalysts under a variety of conditions. Pillared clays gave higher gas yields and higher hydrocracking but lower hydroisomerization activity than nonpillared clay. The majority of the products were branched alkanes (isoparaffinic). These catalysts effectively use hydrogen as indicated by the minimal formation of aromatic hydrocarbons, coke, or other oligomeric materials. The effect of various operating conditions, i.e., reaction temperature, contact time, H{sub 2} pressure, and catalyst, on the product distribution will be described.

  19. Superbend upgrade of the Advanced Light Source

    SciTech Connect (OSTI)

    Robin, D.; Krupnick, J.; Schlueter, R.; Steier, C.; Marks, S.; Wang, B.; Zbasnik, J.; Benjegerdes, R.; Biocca, A.; Bish, P.; Brown, W.; Byrne, W.; Chen, J.; Decking, W.; DeVries, J.; DeMarco, W.R.; Fahmie, M.; Geyer, A.; Harkins, J.; Henderson, T.; Hinkson, J.; Hoyer, E.; Hull, D.; Jacobson, S.; McDonald, J.; Molinari, P.; Mueller, R.; Nadolski, L.; Nishimura, H.; Nishimura, K.; Ottens, F.; Paterson, J.A.; Pipersky, P.; Portmann, G.; Richie, A.; Rossi, S.; Salvant, B.; Scarvie, T.; Schmidt,A.; Spring, J.; Taylor, C.; Thur, W.; Timossi, C.; Wandesforde, A.

    2004-05-26

    The Advanced Light Source (ALS) is a third generation synchrotron light source located at Lawrence Berkeley National Laboratory (LBNL). There was an increasing demand at the ALS for additional high brightness hard x-ray beamlines in the 7 to 40 keV range. In response to that demand, the ALS storage ring was modified in August 2001. Three 1.3 Tesla normal conducting bending magnets were removed and replaced with three 5 Tesla superconducting magnets (Superbends). The radiation produced by these Superbends is an order of magnitude higher in photon brightness and flux at 12 keV than that of the 1.3 Tesla bends, making them excellent sources of hard x-rays for protein crystallography and other hard x-ray applications. At the same time the Superbends did not compromise the performance of the facility in the VUV and soft x-ray regions of the spectrum. The Superbends will eventually feed 12 new beamlines greatly enhancing the facility's capability and capacity in the hard x-ray region. The Superbend project is the biggest upgrade to the ALS storage ring since it was commissioned in 1993. In this paper we present an overview of the Superbend project, its challenges and the resulting impact on the ALS.

  20. Screening of processing and upgrading schemes

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  1. Optical Link ASICs for the LHC Upgrade

    E-Print Network [OSTI]

    K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

    2009-11-23

    We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

  2. HAWC Upgrade with a Sparse Outrigger Array

    E-Print Network [OSTI]

    Sandoval, A

    2015-01-01

    The High Altitude Water Cherenkov (HAWC) high-energy gamma-ray observatory has recently been completed on the slopes of the Sierra Negra volcano in central Mexico. HAWC consists of 300 Water Cherenkov Detectors, each containing 180 m$^3$ of ultra-purified water, that cover a total surface area of 20,000 m$^2$. It detects and reconstructs cosmic- and gamma-ray showers in the energy range of 100 GeV to 100 TeV. The HAWC trigger for the highest energy gammas reaches an effective area of 10$^5$ m$^2$ but many of them are poorly reconstructed because the shower core falls outside the array. An upgrade that increases the present fraction of well reconstructed showers above 10 TeV by a factor of 3-4 can be done with a sparse outrigger array of small water Cherenkov detectors that pinpoint the core position and by that improve the angular resolution of the reconstructed showers. Such an outrigger array would be of the order of 200 small water Cherenkov detectors of 2.5 m$^3$ placed over an area four times larger than...

  3. NSTX Program Overview andNSTX Program Overview and NSTX Upgrade Physics Design ProgressNSTX Upgrade Physics Design Progress

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -B318, PPPL NSTXNSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INL in Upgrade 6. Develop normally-conducting radiation-tolerant magnets for ST applications · Desig

  4. MODELING OF VERTICAL GROUND LOOP HEAT EXCHANGERS FOR GROUND SOURCE

    E-Print Network [OSTI]

    exchanger model is crucial for analysis of hybrid ground source heat pump systems. Ground source heat pumps in a hybrid ground source heat pump application under different climate conditions. An actual office buildingMODELING OF VERTICAL GROUND LOOP HEAT EXCHANGERS FOR GROUND SOURCE HEAT PUMP SYSTEMS By CENK

  5. Boiler Upgrades and Decentralizing Steam Systems Save Water and...

    Office of Environmental Management (EM)

    GSHP demo projects) Credit: Oak Ridge National Lab Data Analysis from Ground Source Heat Pump Demonstration Projects Ground Source Heat Pump System Data Analysis DOE IDIQ...

  6. Ground potential rise monitor

    DOE Patents [OSTI]

    Allen, Zachery Warren; Zevenbergen, Gary Allen

    2012-07-17

    A device and method for detecting ground potential rise (GPR) comprising a first electrode, a second electrode, and a voltage attenuator. The first electrode and the second electrode are both electrically connected to the voltage attenuator. A means for determining the presence of a dangerous ground potential is connected to the voltage attenuator. The device and method further comprises a means for enabling one or more alarms upon the detection of the dangerous ground potential. Preferably, a first transmitter/receiver is connected to the means for enabling one or more alarms. Preferably, a second transmitter/receiver, comprising a button, is electromagnetically connected to the first transmitter/receiver. Preferably, the means for determining the presence of a dangerous ground potential comprises a means for determining the true RMS voltage at the output of the voltage attenuator, a transient detector connected to the output of the voltage attenuator, or a combination thereof.

  7. ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC

    E-Print Network [OSTI]

    Valderanis, Chrysostomos; The ATLAS collaboration

    2015-01-01

    ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC The luminosity of the LHC will increase up to 2x10^34 cm-2s-1 after the long shutdown in 2019 (phase-1 upgrade) and up to 7x10^34 cm-2s-1 after the long shutdown in 2025 (phase-2 upgrade). In order to cope with the increased particle fluxes, upgrades are envisioned for the ATLAS muon spectrometer. At phase-1, the current innermost stations of the ATLAS muon endcap tracking system (the Small Wheels) will be upgraded with 2x4-layer modules of Micromega detectors, sandwiched by two 4 layer modules of small strip Thin Gap Chambers on either side. Each 4-layer module of the so-called New Small Wheels covers a surface area of approximately 2 to 3 m2 for a total active area of 1200 m2 each for the two technologies. On such large area detectors, the mechanical precision (30 \\mu m along the precision coordinate and 80 \\mu m along the beam) is a key point and must be controlled and monitored along the process of construction and integration. The design and re...

  8. Upgrade Strategies for the Proton Synchrotron Booster Dump at CERN

    E-Print Network [OSTI]

    Sarrio Martinez, A; Maglioni, C

    2012-01-01

    CERN’s LHC Injection chain Upgrade (LIU) involves a revision of the Proton Synchrotron Booster dump, which was designed in the 1960’s to cope with beam energies reaching 800 MeV and intensities of 1e+13 particles per pulse. Thermo-mechanical studies highlighted the need for an upgrade of the dump, so that it is capable of withstanding energies in the order of 2 GeV and intensities up to 1e+14 particles per pulse. This paper proposes a new design of the dump in the light of various constraints and choices such as the geometry, materials and the integration of the required cooling system. Further topics discussed include the strategy for dismantling the old device, which has been continuously irradiated for almost 40 years and presents a difficult access. Therefore, a detailed ALARA procedure is being prepared in order to carry out the upgrade works in the area.

  9. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A.; Thomas, C.P.

    1995-10-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to upgrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  10. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema (OSTI)

    None

    2011-10-06

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  11. Chemical Burn Secondary to Propofol Extravasation

    E-Print Network [OSTI]

    Sharma, Rahul; Yoshikawa, Hana; Abisaab, Josyann

    2012-01-01

    IN E MERGENCY M EDICINE Chemical Burn Secondary to Propofolof Emergency Medicine Chemical Burn Secondary to Propofol

  12. Predaceous Ground Beetles 

    E-Print Network [OSTI]

    Sansone, Chris; Minzenmayer, Rick

    2003-06-30

    an odor. Ground beetles are part of the order Coleoptera. This is the largest order of insects with over a quarter of a million species described throughout the world ? about 30,000 species in the United States. Most beetles have two pairs of wings... on other insects in both the larval and adult stages. A few species feed on seeds and organic litter, but only rarely does the feeding produce eco- nomic damage. The different common names refer to the fam- ily?s habits. Because ground beetles are effec...

  13. Reactor control system upgrade for the McClellan Nuclear Radiation Center

    E-Print Network [OSTI]

    Power, Michael A.

    1999-01-01

    a new reactor control system for the McClellan NuclearI REACTOR CONTROL SYSTEM UPGRADE FOR THE McCLELLAN NUCLEARReactor Control System Upgrade for the McClellan Nuclear

  14. Hopper OS upgrade and new SW set to default next Wed, Feb 27

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OS upgrade and new SW set to default next Wed, Feb 27 Hopper OS upgrade and new SW set to default next Wed, Feb 27 February 21, 2013 by Helen He (0 Comments) 1) There will be a...

  15. Building Value with Energy-Saving Upgrades in Homes and Businesses...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen...

  16. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  17. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  18. Aalborg Universitet Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel

    E-Print Network [OSTI]

    Vasquez, Juan Carlos

    Aalborg Universitet Reactive Power Support of Electrical Vehicle Charging Station Upgraded of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System," in Proc. IEEE PowerTech, 2015. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy

  19. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Guillas, Serge

    for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via.maribu@ensmp.fr 1 #12;Investment and Upgrade under Uncertainty in Distributed Generation 2 Keywords: Combined heat heat exchangers (HXs) to meet local energy loads. Although the electric-only efficiency of DG is lower

  20. THE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC

    E-Print Network [OSTI]

    Washington at Seattle, University of

    , with relatively low ~by FRC standards! megawatt-level RMF input powers. After initial forma- tion, the plasmaTHE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC PERFORMANCE K. E. MILLER. MILROY, Z. A. PIETRZYK, and G. C. VLASSES University of Washington Redmond Plasma Physics Laboratory

  1. Technologies for Upgrading Light Water Reactor Outlet Temperature

    SciTech Connect (OSTI)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  2. Progress in MPC and A upgrades at Luch

    SciTech Connect (OSTI)

    Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

    1997-09-01

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

  3. A THEORY UPGRADE FOR RHIC: Towards a Quantitative Understanding of

    E-Print Network [OSTI]

    Gustafsson, Torgny

    is of an enabling nature, comparable to the construction and upgrades of facilities and instruments which enable #12;I. The Challenge The RHIC facility provides a unique environment for studying QCD bulk matter, suggesting a strongly coupled medium. Third, large domains in parameter space for the equation of state have

  4. Automating Database Schema Evolution in Information System Upgrades

    E-Print Network [OSTI]

    Zaniolo, Carlo

    Automating Database Schema Evolution in Information System Upgrades Carlo Curino Hyun J. Moon Carlo, and down-time currently created by the database schema evolution process is the source of incessant prob and historical queries for database archives under schema evolution. Keywords Schema Evolution, Database Design

  5. Version 3 June 20, 2015 NSTX Upgrade Program Letter

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Innovative Diagnostics for FY 2016-2018 Introduction This NSTX Upgrade (NSTX-U)1 Program Letter provides for reducing cost, risk, and development time for practical fusion energy. The ST appears particularly, with its unique properties, thus extends and complements the higher aspect ratio, lower T tokamak

  6. Recent Upgrade of the Klystron Modulator at SLAC

    SciTech Connect (OSTI)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  7. MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF

    E-Print Network [OSTI]

    MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF CLOUD COVER AND WATER VAPOUR Purchase Order 58311/ODG/99/8362/GWI/LET #12;i PREFACE Starting in August 1998, operational forecasts satellite imagery from the Co-operative Institute for Research in the Atmosphere (CIRA) and upper

  8. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003 manual of the COCONUT API Version 2. 2. Name changes #15; In inference engines model was renamed to wnode was taken out of semantics.h and put into the new header #12;le coconut types.h. 4. Additional features Some

  9. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003 of the COCONUT API Version 2. 2. Base class There are four di#11;erent base classes for evaluator programming been implemented in the COCONUT API version 2. In the following I will give a short description of all

  10. RHIC Operation and Plans for Upgrades Wolfram Fischer

    E-Print Network [OSTI]

    Ã? design 10Ã? achieved #12;Wolfram Fischer 7 Achieved parameters Mode No of bunches Ions/bunch [ 1 0 9] enhanced luminosity 60e9 Au intensity design luminosity Beamexperiments #12;Wolfram Fischer 10 RHIC Run-41 RHIC Operation and Plans for Upgrades Wolfram Fischer C-AD Machine Advisory Committee Meeting 10

  11. Post Production Heavy Oil Operations: A Case for Partial Upgrading 

    E-Print Network [OSTI]

    Lokhandwala, Taher

    2012-12-05

    The transportation of heavy oil is a pressing problem. Various methods have been devised to mitigate the reluctance to flow of these highly dense and viscous oils. This study is focused on evaluating a case for post-production partial upgrading...

  12. SEWAGE LAGOON DESIGN USING WETLANDS AND OTHER UPGRADING TECHNOLOGIES

    E-Print Network [OSTI]

    that a total ammonia concentration of 5 mg/L-N be used as a design criteria. In additionto presenting design#12;L L llF L L L SEWAGE LAGOON DESIGN USING WETLANDS AND OTHER UPGRADING TECHNOLOGIES TO ACHIEVE effluents are typically non-toxic. Using an arbitrary factor of safety of two, it is recommended

  13. Low rank coal upgrading in a flow of hot water

    SciTech Connect (OSTI)

    Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura

    2009-09-15

    Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

  14. NSTX Upgrade Umbrella Arch and Foot Reinforcements, Local Dome Details 1 | P a g e NSTX Upgrade

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    clevis restraint/support. Calculation (Calculation is either documented here or attached) Attached was accomplished.) With recommended reinforcements, the 3/4 inch 316 bolts are acceptable for the upgrade loads in strength by integrating it with the TF strap support. Cognizant Engineer's printed name, signature

  15. Computational RNA Secondary Structure Design

    E-Print Network [OSTI]

    Fournier, John J.F.

    Computational RNA Secondary Structure Design: Empirical Complexity and Improved Methods by Rosal in this thesis is focused on the design of RNA strands that are predicted to fold to a given secondary structure, according to a standard thermodynamic model. The design of RNA structures is important for applications

  16. MODELING OF VERTICAL GROUND LOOP HEAT EXCHANGERS FOR GROUND SOURCE

    E-Print Network [OSTI]

    MODELING OF VERTICAL GROUND LOOP HEAT EXCHANGERS FOR GROUND SOURCE HEAT PUMP SYSTEMS By CENK SOURCE HEAT PUMP SYSTEMS Thesis Approved: ___________________________________________ Thesis Adviser pump systems. For detailed analysis and accurate simulation of the transient heat transfer in vertical

  17. Grounded Cognition Lawrence W. Barsalou

    E-Print Network [OSTI]

    Barsalou, Lawrence W.

    Simulation Theories. . . . 622 Social Simulation Theories . . . . . . . 623 EMPIRICAL EVIDENCE. Theories of grounded cognition are also reviewed, as are origins of the area and common misperceptions to affect the growth and impact of grounded cognition. 617 Annu.Rev.Psychol.2008

  18. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  19. CMS TECHNICAL DESIGN REPORT FOR THE MUON ENDCAP GEM UPGRADE

    E-Print Network [OSTI]

    Colaleo, A; Sharma, A; Tytgat, M

    2015-01-01

    This report describes both the technical design and the expected performance of the Phase-II upgrade, using Gas Electron Multiplier (GEM) detectors, of the first endcap station of the CMS muon system. The upgrade is targeted for the second long shutdown of the CERN LHC and is designed to improve the muon trigger and tracking performance at high luminosity. The GEM detectors will add redundancy to the muon system in the 1.6 technology to operate in the high radiation environment present in that region. The first muon endcap station will be instrumented with a double layer of triple-GEM chambers in the 1.6 < |?| < 2.2 region. The detector front-end electronics uses the custom designed VFAT3 chip to provide both fast input for the level-1 muon trigger ...

  20. Upgrade of Beam Energy Measurement System at BEPC-II

    E-Print Network [OSTI]

    Jian-Yong Zhang; Xiao Cai; Xiao-Hu Mo; Di-Zhou Guo; Jian-Li Wang; Bai-Qi Liu; M. N. Achasov; A. A. Krasnov; N. Yu. Muchnoi; E. E. Pyata; E. V. Mamoshkina; F. A. Harris

    2015-10-28

    The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise instruments are employed to realize the highly accurate measurement of positron/electron beam energy. During five year's running period, in order to meet the requirement of data taking and improve the capacity of measurement itself, the upgradation of system is continued, which involve the component reformation of laser and optics subsystem, replacement of view-port of the laser to vacuum insertion subsystem, the purchase of electric cooling system for high purity germanium detector, and the improvement of data acquisition and processing subsystem. The upgrading of system guarantees the smooth and efficient measuring of beam energy at BEPC-II and accommodates the accurate offline energy values for further physics analysis at BES-III.

  1. Upgrade of Beam Energy Measurement System at BEPC-II

    E-Print Network [OSTI]

    Zhang, Jian-Yong; Mo, Xiao-Hu; Guo, Di-Zhou; Wang, Jian-Li; Liu, Bai-Qi; Achasov, M N; Krasnov, A A; Muchnoi, N Yu; Pyata, E E; Mamoshkina, E V; Harris, F A

    2015-01-01

    The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise instruments are employed to realize the highly accurate measurement of positron/electron beam energy. During five year's running period, in order to meet the requirement of data taking and improve the capacity of measurement itself, the upgradation of system is continued, which involve the component reformation of laser and optics subsystem, replacement of view-port of the laser to vacuum insertion subsystem, the purchase of electric cooling system for high purity germanium detector, and the improvement of data acquisition and processing subsystem. The upgrading of system guarantees the smooth and efficient measuring of beam energy at BEPC-II and accommodates the accurate offline energy values for further physics analysis at BES-III.

  2. The start-up of the bi-provincial upgrader

    SciTech Connect (OSTI)

    Chase, S. [Husky Oil Operations Ltd., Calgary, Alberta (Canada)

    1995-12-31

    The Bi-Provincial Upgrader is a $1.63 x 10{sup 9} Cdn grass-roots heavy oil upgrading facility located near Lloydminster, Saskatchewan. The facility, which started operation in August 1992, is designed to produce 7300 m{sup 3}/day of 34{degrees}API synthetic crude from 11-15{degrees}API heavy crude oils. The start-up and initial operation of the facility has been a technical success. The facility reached design capacity in a much shorter time than typically reported for the start-up of similar units and has operated reliably at better than design capacity. In this paper, the plant operating performance is reviewed in some detail. A review of the engineering and construction phases and a summary of regional benefits is also included.

  3. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-07-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to ungrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  4. Detector and System Developments for LHC Detector Upgrades

    E-Print Network [OSTI]

    Mandelli, Beatrice; Guida, Roberto; Rohne, Ole; Stapnes, Steinar

    2015-05-12

    The future Large Hadron Collider (LHC) Physics program and the consequent improvement of the LHC accelerator performance set important challenges to all detector systems. This PhD thesis delineates the studies and strategies adopted to improve two different types of detectors: the replacement of precision trackers with ever increasingly performing silicon detectors, and the improvement of large gaseous detector systems by optimizing their gas mixtures and operation modes. Within the LHC tracker upgrade programs, the ATLAS Insertable B-layer (IBL) is the first major upgrade of a silicon-pixel detector. Indeed the overall ATLAS Pixel Detector performance is expected to degrade with the increase of luminosity and the IBL will recover the performance by adding a fourth innermost layer. The IBL Detector makes use of new pixel and front-end electronics technologies as well as a novel thermal management approach and light support and service structures. These innovations required complex developments and Quality Ass...

  5. ALT-II armor tile design for upgraded TEXTOR operation

    SciTech Connect (OSTI)

    Newberry, B.L. [Univ. of Michigan, Ann Arbor, MI (United States); McGrath, R.T.; Watson, R.D. [Sandia National Labs., Albuquerque, NM (United States); Kohlhaas, W.; Finken, K.H. [Kernforschungsanlage Juelich GmbH (Germany). Inst. fuer Plasmaphysik; Noda, N. [National Inst. for Fusion Science, Nagoya (Japan)

    1994-08-01

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated.

  6. Providing protection: Agencies receive funding to repair, upgrade dams 

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01

    by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations passed between... 1944 and 1981. Land rights were acquired from landowners, and local agencies constructed the dams with federal money from NRCS (formerly the Soil Conservation Service). Local sponsors?including cities, counties, local soil and water conservation...

  7. Resolution studies and performance evaluation of the LHCb VELO upgrade

    E-Print Network [OSTI]

    Hynds, Daniel Peter McFarlane; Soler, Paul; Parkes, Christopher

    2015-03-25

    The LHCb detector at CERN is scheduled to undergo an upgrade during the second long shutdown of the LHC. As part of this upgrade, the vertex detector (VELO) will be replaced with a new hybrid pixel detector, based on an evolution of the Timepix ASIC. The performance of this detector should improve upon that achieved by the current VELO, in addition to facilitating the complete detector readout at 40 MHz. As part of the preparation for this upgrade, this thesis presents the results of studies carried out on the single hit resolution of silicon hybrid pixel detectors. The development of a particle beam telescope has been carried out to allow these studies, shown to operate with track rates in excess of 45 kHz and with a pointing resolution at the device under test of less than 2 ?m. A wide range of sensor types, thicknesses and resistivities have then been tested under different operating conditions and the results presented, with single hit resolutions varying between 4 ?m and 12 ?m depending on the conditi...

  8. UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2004-01-01

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

  9. A novel process for upgrading heavy oil emulsions

    SciTech Connect (OSTI)

    Ng, F.T.T.; Rintjema, R.T. [Univ. of Waterloo, Ontario (Canada). Dept. of Chemical Engineering

    1994-12-31

    Canada has extensive reserves of high sulfur heavy oils. These heavy oils are recovered primarily by steam injection techniques. As a result, the heavy oils are obtained as emulsions at well-heads. The heavy oils, being high in sulfur and metals, and low in hydrogen to carbon atomic ratio, require upgrading such as desulfurization and hydrocracking before it can be used in conventional refineries. Conventional emulsion treatment and desulfurization technology require multistage processing. Thus, alternative technologies for processing heavy oil emulsions would be attractive. The authors have recently developed a novel single stage process for upgrading emulsions via activation of water to provide hydrogen in situ for catalytic desulfurization and hydrocracking. Current work is focused on the desulfurization aspect of upgrading, using benzothiophene as the model sulfur compound and molybdic acid as the catalyst. At 340 C and a CO loading pressure of 600 psi, up to 86% sulfur removal was obtained. As well, in situ generated H{sub 2} was found to be more active than externally supplied molecular H{sub 2}. A likely pathway for desulfurization of benzothiophene was via the initial hydrogenation of benzothiophene to dihydrobenzothiophene followed by hydrogenolysis to give ethylbenzene and H{sub 2}S.

  10. Performance of the MAGIC telescopes after the major upgrade

    E-Print Network [OSTI]

    Sitarek, Julian; Colin, Pierre; Mazin, Daniel

    2015-01-01

    MAGIC is a system of two Imaging Atmospheric Cherenkov Telescopes located on the Canary island of La Palma, Spain. During summer 2011 and 2012 it underwent a major upgrade. The main subsystems upgraded were the MAGIC-I camera and its trigger system and the readout system of both telescopes. We use observations of the Crab Nebula taken at low and medium zenith angles to assess the key performance parameters of the MAGIC stereo system. For low zenith angle observations, the standard trigger threshold of the MAGIC telescopes is about 50 GeV. The integral sensitivity for point-like sources with Crab Nebula-like spectra above 220 GeV is (0.66 +/- 0.03)% of Crab Nebula flux in 50 h of observations. The angular resolution, defined as the sigma of a 2-dimensional Gaussian distribution, at energies of a few hundred GeV is below 0.07degree, while the energy resolution is around 16%. We investigate the effect of the systematic uncertainty on the data taken with the MAGIC telescopes after the upgrade. We estimate that th...

  11. Snowflake divertor configuration studies for NSTX-Upgrade

    SciTech Connect (OSTI)

    Soukhanovskii, V A

    2011-11-12

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  12. Development projects: Secondary school, Arnold 

    E-Print Network [OSTI]

    Anonymous

    This BULLETIN describes a secondary school at Arnold, Nottinghamshire, designed by the Development Group of the Architects and Building Branch of the Ministry of Education in collaboration with the Local Education Authority. It was the sixth...

  13. Evolutionary conservation of sequence and secondary structures...

    Office of Scientific and Technical Information (OSTI)

    Evolutionary conservation of sequence and secondary structures inCRISPR repeats Citation Details In-Document Search Title: Evolutionary conservation of sequence and secondary...

  14. Secondary Waste Forms and Technetium Management

    Office of Environmental Management (EM)

    Secondary Waste Forms and Technetium Management Joseph H. Westsik, Jr. Pacific Northwest National Laboratory EM HLW Corporate Board Meeting November 18, 2010 What are Secondary...

  15. Ground potential rise monitor

    DOE Patents [OSTI]

    Allen, Zachery W. (Mandan, ND); Zevenbergen, Gary A. (Arvada, CO)

    2012-04-03

    A device and method for detecting ground potential rise (GPR) comprising positioning a first electrode and a second electrode at a distance from each other into the earth. The voltage of the first electrode and second electrode is attenuated by an attenuation factor creating an attenuated voltage. The true RMS voltage of the attenuated voltage is determined creating an attenuated true RMS voltage. The attenuated true RMS voltage is then multiplied by the attenuation factor creating a calculated true RMS voltage. If the calculated true RMS voltage is greater than a first predetermined voltage threshold, a first alarm is enabled at a local location. If user input is received at a remote location acknowledging the first alarm, a first alarm acknowledgment signal is transmitted. The first alarm acknowledgment signal is then received at which time the first alarm is disabled.

  16. Project X ICD-2 and its upgrades for Neutrino Factory or Muon Collider

    SciTech Connect (OSTI)

    Lebedev, Valeri; Nagaitsev, Sergei; /Fermilab

    2009-10-01

    This paper reviews the Initial Configuration Document for Fermilab's Project X and considers its possible upgrades for neutrino factory or muon collider.

  17. Energy Upgrade California in Los Angeles County-- The Flex Path Program

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County: The Flex Path Program. Provides an overview of the Flex Path Pilot Program, progress and next steps.

  18. Sandia Energy - Upgrades to SNL-EFDC: A Tool to Balance Marine...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy Generation Efficiency with Environmental Response Home Renewable Energy Energy Water Power News News & Events...

  19. CRAD, Safety Basis Upgrade Review (DOE-STD-3009-2014) - May 15...

    Office of Environmental Management (EM)

    1) provides objectives, criteria, and approaches for establishing and maintaining the safety basis at nuclear facilities. CRAD, Safety Basis Upgrade Review (DOE-STD-3009-2014)...

  20. Searches for Higgs Boson(s) at the Upgraded Tevatron

    E-Print Network [OSTI]

    Gregorio Bernardi; for the CDF; D0 collaborations

    2005-07-14

    We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the DO and CDF collaborations. We report on three categories of searches, namely 1) the search for the Standard Model Higgs boson (p\\bar{p} --> H, WH or ZH, with H --> WW* and/or H --> b\\bar{b}), 2) the search for the minimal supersymmetric Higgs boson using p\\bar{p} --> hb\\bar{b} --> b\\bar{b}b\\bar{b} and p\\bar{p} --> hX --> tau tau X, 3) the search for doubly charged Higgs boson.

  1. FELIX: the detector readout upgrade of the ATLAS experiment

    E-Print Network [OSTI]

    Ryu, Soo; The ATLAS collaboration

    2015-01-01

    After the Phase-I upgrade and onward, the Front-End Link eXchange(FELIX) system will be the interface between the readout system and the detector front-end electronics and trigger electronics at the ATLAS experiment. FELIX will function as a gateway to a commodity switched network which will use standard technologies (Ethernet or Infiniband) to communicate with data collecting and processing components. In this talk the system architecture of FELIX will be described and the testing results of the FELIX demonstrator will be presented

  2. D0 Silicon Upgrade: Lower Cleanroom Roof Quick Load Analysis

    SciTech Connect (OSTI)

    Rucinski, Russ; /Fermilab

    1995-11-17

    This engineering note documents calculations done to determine the margin of safety for the lower clean room roof. The analysis was done to give me a feeling of what the loads, stresses and capacity of the roof is prior to installation and installation work to be done for the helium refrigerator upgrade. The result of this quick look showed that the calculated loads produce stress values and loads at about half the allowables. Based on this result, I do not think that special precautions above personal judgement are required for the installation work.

  3. Network Upgrade for the SLC: Control System Modifications

    SciTech Connect (OSTI)

    Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

    2011-09-09

    Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

  4. Staged Upgrades - Homeowner-focused Strategies for Encouraging Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo.Hydrogen4EnergySolidof2 SpecialSpent|Staffing forUpgrades over

  5. Staged Upgrades as a Strategy for Residential Energy Efficiency |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo.Hydrogen4EnergySolidof2 SpecialSpent|Staffing forUpgrades

  6. Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographic courtesyEducation Data JamDepartment of Energy Upgrades:

  7. County Aims to Save with Upgrades | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:IAbout Us » ContactCounty Aims to Save with Upgrades

  8. Secondary Electron Emission from Dust and Its Effect on Charging

    SciTech Connect (OSTI)

    Saikia, B. K.; Kakati, B.; Kausik, S. S. [Centre of Plasma Physics, Institute for Plasma Research, Nazirakhat, Sonapur-782402, Assam (India); Bandyopadhyay, M. [ITER-India, Institute for Plasma Research, Bhat, Gandhinagar-382 428 (India)

    2011-11-29

    Hydrogen plasma is produced in a plasma chamber by striking discharge between incandescent tungsten filaments and the permanent magnetic cage [1], which is grounded. The magnetic cage has a full line cusped magnetic field geometry used to confine the plasma elements. A cylindrical Langmuir probe is used to study the plasma parameters in various discharge conditions. The charge accumulated on the dust particles is calculated using the capacitance model and the dust current is measured by the combination of a Faraday cup and an electrometer at different discharge conditions. It is found Secondary electron emission from dust having low emission yield effects the charging of dust particles in presence of high energetic electrons.

  9. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    SciTech Connect (OSTI)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to fuel systems. 4. Install power to new dampers/louvers from panel and breakers as shown on drawings. Wiring shall be similar to installation to existing dampers/louvers. Utilize existing conduits already routed to louver areas to field route the new wiring in the most reasonable way possible. Add any conduits necessary to complete wiring to new dampers/louvers. 5. Install power to jacket water heaters for new generators 3 and 4 from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 6. Install new neutral grounding resistor and associated parts and wiring for new generators 3 and 4 to match existing installation for generators 1 and 2. Grounding resistors will be Government Furnished Equipment (GFE). 7. Install two new switchgear sections, one for generator #3 and one for generator #4, to match existing generator #1 cubicle design and installation and in accordance with drawings and existing parts lists. This switchgear will be provided as GFE. 8. Ground all new switchgear, generators 3 and 4, and any other new equipment to match existing grounding connections for generators 1 and 2, switchgear and other equipment. See drawings for additional details. Grounding grid is already existing. Ensure that all grounding meets National Electrical Code requirements. 9. Cummins DMC control for the generator and switchgear syste

  10. A calcium oxygen secondary battery

    SciTech Connect (OSTI)

    Pujare, N.U.; Semkow, K.W.; Sammells, A.F.

    1988-01-01

    The authors report preliminary work performed in their laboratory on a high-temperature electrochemically reversible calcium-oxygen cell. Following an analogous strategy to that recently discussed for the lithium-oxygen secondary system, this calcium-oxygen cell utilizes stabilized zirconia oxygen vacancy conducting solid electrolytes to achieve effective separation between half-cell reactions.

  11. Upgrade of the electron beam ion trap in Shanghai

    SciTech Connect (OSTI)

    Lu, D.; Yang, Y.; Xiao, J.; Shen, Y.; Fu, Y.; Wei, B.; Yao, K.; Hutton, R.; Zou, Y., E-mail: zouym@fudan.edu.cn [The Key Lab of Applied Ion Beam Physics, Ministry of Education, 200433 Shanghai (China); Shanghai EBIT Lab, Institute of Modern Physics, Fudan University, 200433 Shanghai (China)

    2014-09-15

    Over the last few years the Shanghai electron beam ion trap (EBIT) has been successfully redesigned and rebuilt. The original machine, developed under collaboration with the Shanghai Institute of Applied Physics, first produced an electron beam in 2005. It could be tuned with electron energies between 1 and 130 keV and beam current up to 160 mA. After several years of operation, it was found that several modifications for improvements were necessary to reach the goals of better electron optics, higher photon detection, and ion injection efficiencies, and more economical running costs. The upgraded Shanghai-EBIT is made almost entirely from Ti instead of stainless steel and achieves a vacuum of less than 10{sup ?10} Torr, which helps to minimize the loss of highly changed ions through charge exchange. Meanwhile, a more compact structure and efficient cryogenic system, and excellent optical alignment have been of satisfactory. The magnetic field in the central trap region can reach up till 4.8 T with a uniformity of 2.77 × 10{sup ?4}. So far the upgraded Shanghai-EBIT has been operated up to an electron energy of 151 keV and a beam current of up to 218 mA, although promotion to even higher energy is still in progress. Radiation from ions as highly charged as Xe{sup 53+,} {sup 54+} has been produced and the characterization of current density is estimated from the measured electron beam width.

  12. 12 GeV Upgrade Project - Cryomodule Production

    SciTech Connect (OSTI)

    J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

    2012-07-01

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

  13. Operation of the Upgraded ATLAS Level-1 Central Trigger System

    E-Print Network [OSTI]

    Glatzer, Julian Maximilian Volker; The ATLAS collaboration

    2015-01-01

    The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different sub-detector combinations. In this contribution, we give an overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are m...

  14. Operation of the Upgraded ATLAS Level-1 Central Trigger System

    E-Print Network [OSTI]

    Glatzer, Julian Maximilian Volker; The ATLAS collaboration

    2015-01-01

    The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different subdetector combinations. An overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects is given. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are monitored coherently at...

  15. Analysis of NSTX Upgrade OH Magnet and Center Stack

    SciTech Connect (OSTI)

    A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

    2010-11-30

    The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

  16. Upgrading of Sergiev Posad department of Moscow NPO Radon

    SciTech Connect (OSTI)

    Debieve, Pierre [BELGATOM, Avenue Ariane 4, B 1200 Brussels (Belgium); Delecaut, Gregory; Vanleeuw, Daniel [Institut National des Radioelements - IRE, 6220 Fleurus (Belgium)

    2007-07-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  17. Post Retort, Pre Hydro-treat Upgrading of Shale Oil

    SciTech Connect (OSTI)

    Gordon, John

    2012-09-30

    Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

  18. The upgrade of the LHCb Vertex Locator (VELO)

    E-Print Network [OSTI]

    van Beuzekom, M

    2014-01-01

    The upgrade of the LHCb experiment, planned for 2018, will enable the detector to run at a luminosity of 2 x 10$^{33}$ cm$^{-22}$s$^{-1}$ and explore New Physics effects in the beauty and charm sector with unprecedented precision. To achieve this, the entire readout will be transformed into a triggerless system operating at 40 MHz, where the event selection algorithms will be executed by high-level software in the CPU farm. The upgraded silicon vertex detector (VELO) must be lightweight, radiation hard, vacuum compatible, and has to drive data to the data acquisition system at speeds of up to 3 Tbit/s. This challenge will be met with a new VELO design based on hybrid pixel detectors, positioned to within 5 mm of the LHC colliding beams. The sensors have 55 x 55 $\\mu$m$^2$ square pixels and the VeloPix ASIC, which is being developed for the readout, is based on the Timepix/Medipix family of chips. The hottest ASIC will have to cope with integrated hit rates of up to 900 MHz which translates to a bandwidth of m...

  19. RF Power Upgrade for CEBAF at Jefferson Laboratory

    SciTech Connect (OSTI)

    Andrew Kimber,Richard Nelson

    2011-03-01

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  20. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    SciTech Connect (OSTI)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

  1. Regional analysis of ground and above-ground climate

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

  2. Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating

    E-Print Network [OSTI]

    Cui, Yi

    Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating, Stanford, California 94305, United States *S Supporting Information ABSTRACT: Heavy crude oil can that by using carbon nano- catalysts, heavy crude oil can be efficiently upgraded to lighter oil at a relatively

  3. CFD Simulation of Catalytic Upgrading of Pyrolytic Vapours in FCC Riser

    E-Print Network [OSTI]

    -treatment of pyrolysis vapor; Design of catalyst (Red mud) Aqueous phase HDO upgrading of pre-treated bio-oil. ProcessCFD Simulation of Catalytic Upgrading of Pyrolytic Vapours in FCC Riser Prof Sai Gu, Centre/pre- commercial · Quality: Produced oil not suitable for transportation fuels: high oxygen, acidity and reactivity

  4. Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion 

    E-Print Network [OSTI]

    Huseynzade, Samir

    2009-05-15

    In-situ upgrading of oil using hydrogen donors is a new process. In particular, very little research has been conducted with respect to in-situ oil upgrading using hydrogen donor under in-situ combustion. Several papers describe the use of metal...

  5. Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade

    E-Print Network [OSTI]

    Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade. Fortunately, the ability to finance energy projects using outside funding has increased over the past decade. Louis. A decade ago, not many traditional financial institutions really wanted to finance energy upgrade

  6. NSTX Upgrade Project Final Design Review June 22 -24, 2011 1 NSTX Supported by

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project ­ Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W Photonics New York U Old Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Plasma Physics Laboratory NSTX Upgrade Project Final Design Review LSB, B318 June 22-24, 2011 1 Monday

  7. Proactive Price Regulation for Upgrading Telecommunications Infrastructure and Jon M. Peha

    E-Print Network [OSTI]

    Peha, Jon M.

    1 Proactive Price Regulation for Upgrading Telecommunications Infrastructure Qiong Wang 1 and Jon M that upgrade occurs. This paper discusses a proactive pricing approach in which the regulator defines a pricing, and specify a proactive pricing policy to induce that timing. We also demonstrate a tradeoff between promoting

  8. REFURBISHMENT AND UPGRADE OF FE BOLTZMANN/RAYLEIGH TEMPERATURE LIDAR AT BOULDER FOR A MCMURDO LIDAR CAMPAIGN IN ANTARCTICA

    E-Print Network [OSTI]

    Chu, Xinzhao

    REFURBISHMENT AND UPGRADE OF FE BOLTZMANN/RAYLEIGH TEMPERATURE LIDAR AT BOULDER FOR A MCMURDO LIDAR conditions, refurbishment and upgrade of the system was necessary in order to restore its performance. More

  9. Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

    E-Print Network [OSTI]

    2012-01-01

    Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

  10. Assessment of Scrape-Off Layer Simulations with Drifts Against L-mode Experiments in ASDEX Upgrade and JET

    E-Print Network [OSTI]

    Assessment of Scrape-Off Layer Simulations with Drifts Against L-mode Experiments in ASDEX Upgrade and JET

  11. Overview of the physics and engineering design of NSTX upgrade

    SciTech Connect (OSTI)

    Menard, J. E. [Princeton Plasma Physics Laboratory (PPPL); Gerhardt, S. P. [Princeton Plasma Physics Laboratory (PPPL); Bell, M. [Princeton Plasma Physics Laboratory (PPPL); Bialek, J [Columbia University; Brooks, A. [Princeton Plasma Physics Laboratory (PPPL); Canik, John [ORNL; Chrzanowski, J. [Princeton Plasma Physics Laboratory (PPPL); Denault, M [Princeton Plasma Physics Laboratory (PPPL)

    2012-01-01

    The spherical tokamak (ST) is a leading candidate for a Fusion Nuclear Science Facility (FNSF) due to its compact size and modular configuration. The National Spherical Torus eXperiment (NSTX) is a MA-class ST facility in the US actively developing the physics basis for an ST-based FNSF. In plasma transport research, ST experiments exhibit a strong (nearly inverse) scaling of normalized confinement with collisionality, and if this trend holds at low collisionality, high fusion neutron fluences could be achievable in very compact ST devices. A major motivation for the NSTX Upgrade (NSTX-U) is to span the next factor of 3-6 reduction in collisionality. To achieve this collisionality reduction with equilibrated profiles, NSTX-U will double the toroidal field, plasma current, and NBI heating power and increase the pulse length from 1-1.5 s to 5-8 s. In the area of stability and advanced scenarios, plasmas with higher aspect ratio and elongation, high beta(N), and broad current profiles approaching those of an ST-based FNSF have been produced in NSTX using active control of the plasma beta and advanced resistive wall mode control. High non-inductive current fractions of 70% have been sustained for many current diffusion times, and the more tangential injection of the 2nd NBI of the Upgrade is projected to increase the NBI current drive by up to a factor of 2 and support 100% non-inductive operation. More tangential NBI injection is also projected to provide non-solenoidal current ramp-up as needed for an ST-based FNSF. In boundary physics, NSTX measures an inverse relationship between the scrape-off layer heat-flux width and plasma current that could unfavourably impact next-step devices. Recently, NSTX has successfully demonstrated substantial heat-flux reduction using a snowflake divertor configuration, and this type of divertor is incorporated in the NSTX-U design. The physics and engineering design supporting NSTX Upgrade is described.

  12. Ground Penetrating Radar, Barrow, Alaska

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    John Peterson

    2015-03-06

    This is 500 MHz Ground Penetrating Radar collected along the AB Line in Intensive Site 1 beginning in October 2012 and collected along L2 in Intensive Site 0 beginning in September 2011. Both continue to the present.

  13. Ground Penetrating Radar, Barrow, Alaska

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    John Peterson

    This is 500 MHz Ground Penetrating Radar collected along the AB Line in Intensive Site 1 beginning in October 2012 and collected along L2 in Intensive Site 0 beginning in September 2011. Both continue to the present.

  14. Upgrade of the cryogenic CERN RF test facility

    SciTech Connect (OSTI)

    Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B.; Koettig, T.

    2014-01-29

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

  15. Pressure Safety of JLAB 12GeV Upgrade Cryomodule

    SciTech Connect (OSTI)

    Cheng, Gary [JLAB; Wiseman, Mark A. [JLAB; Daly, Ed [JLAB

    2009-11-01

    This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Lab’s 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLAB’s methodologies for implementation of the 10 CFR 851 requirements are described.

  16. Avoiding Distribution System Upgrade Costs Using Distributed Generation

    SciTech Connect (OSTI)

    Schienbein, Lawrence A.; Balducci, Patrick J.; Nguyen, Tony B.; Brown, Daryl R.; DeSteese, John G.; Speer, Gregory A.

    2004-01-20

    PNNL, in cooperation with three utilities, developed a database and methodology to analyze and characterize the avoided costs of Distributed Generation (DG) deployment as an alternative to traditional distribution system investment. After applying a number of screening criteria to the initial set of 307 cases, eighteen were selected for detailed analysis. Alternative DG investment scenarios were developed for these cases to permit capital, operation, maintenance, and fuel costs to be identified and incorporated into the analysis. The “customer-owned” backup power generator option was also investigated. The results of the analysis of the 18 cases show that none yielded cost savings under the alternative DG scenarios. However, the DG alternative systems were configured using very restrictive assumptions concerning reliability, peak rating, engine types and acceptable fuel. In particular it was assumed that the DG alternative in each case must meet the reliability required of conventional distribution systems (99.91% reliability). The analysis was further constrained by a requirement that each substation meet the demands placed upon it by a one in three weather occurrence. To determine if, by relaxing these requirements, the DG alternative might be more viable, one project was re-examined. The 99.91% reliability factor was still assumed for normal operating conditions but redundancy required to maintain reliability was relaxed for the relatively few hours every three years where extreme weather caused load to exceed present substation capacity. This resulted in the deferment of capital investment until later years and reduced the number of engines required for the project. The cost of both the conventional and DG alternative also dropped because the centralized power generation, variable O&M, and DG fuels costs were calculated based on present load requirements in combination with long-term forecasts of load growth, as opposed to load requirements plus a buffer based on predictions of extraordinary weather conditions. Application of the relaxed set of assumptions reduced the total cost of the DG alternative by roughly 57 percent from $7.0 million to $3.0 million. The reduction, however, did not change the overall result of the analysis, as the cost of the conventional distribution system upgrade alternative remained lower at $1.7 million. This paper also explores the feasibility of using a system of backup generators to defer investment in distribution system infrastructure. Rather than expanding substation capacity at substations experiencing slow load growth rates, PNNL considered a scenario where diesel generators were installed on location at customers participating in a program designed to offer additional power security and reliability to the customer and connection to the grid. The backup generators, in turn, could be used to meet peak demand for a limited number of hours each year, thus deferring distribution system investment. Data from an existing program at one of the three participating utilities was used to quantify the costs associated with the backup generator scenario. The results of the “customer owned” backup power generator analysis showed that in all cases the nominal cost of the DG scenario is more than the nominal cost of the base-case conventional distribution system upgrade scenario. However, in two of the cases the total present value costs of the alternative backup generator scenarios were between 15 and 22% less than those for the conventional scenarios. Overall, the results of the study offer considerable encouragement that the use of DG systems can defer conventional distribution system upgrades under the right conditions and when the DG configurations are intelligently designed. Using existing customer-owned DG to defer distribution system upgrades appears to be an immediate commercially-viable opportunity.

  17. NEUTRON RADIOGRAPHY (NRAD) REACTOR 64-ELEMENT CORE UPGRADE

    SciTech Connect (OSTI)

    John D. Bess

    2014-03-01

    The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately +/-1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

  18. THE SNS VACUUM CONTROL SYSTEM UPGRADE FOR THE SUPERCONDUCTING LINAC

    SciTech Connect (OSTI)

    Williams, Derrick C [ORNL] [ORNL

    2009-01-01

    The superconducting linac of the Spallation Neutron Source (SNS) has 23 cryomodules whose vacuum system is monitored and controlled by custom built hardware. The original control hardware was provided by Thomas Jefferson National Accelerator Facility (JLab) and contained a variety of custom boards utilizing integrated circuits to perform logic. The need for control logic changes, a desire to increase maintainability, and a desire to increase flexibility to adapt for the future has led to a Programmable Logic Controller (PLC) based upgrade. This paper provides an overview of the commercial off-the-shelf (COTS) hardware being used in the superconducting vacuum control system. Details of the design and challenges to convert a control system during small windows of maintenance periods without disrupting beam operation will be covered in this paper.

  19. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    SciTech Connect (OSTI)

    Josh A. Salmond

    2009-08-07

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  20. Nuclear materials control and accountability criteria for upgrades measures

    SciTech Connect (OSTI)

    Erkkila, B.H.; Hatcher, C.R.

    1998-11-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

  1. Secondary Energy Infobook Activities (19 Activities)

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Information about Secondary Energy Infobook, 19 student activities on energy basics for grades 5-8 and 9-12.

  2. Tritium Ground Water Issues | Department of Energy

    Office of Environmental Management (EM)

    Ground Water Issues Tritium Ground Water Issues Presentation from the 35th Tritium Focus Group Meeting held in Princeton, New Jersey on May 05-07, 2015. Tritium Ground Water Issues...

  3. MODELING, SIMULATION AND OPTIMIZATION OF GROUND SOURCE

    E-Print Network [OSTI]

    MODELING, SIMULATION AND OPTIMIZATION OF GROUND SOURCE HEAT PUMP SYSTEMS By MUHAMMAD HAIDER KHAN AND OPTIMIZATION OF GROUND SOURCE HEAT PUMP SYSTEMS Thesis Approved..................................................................................................................... 1 1.1 Overview of Ground Source Heat Pump Systems.............................................. 1 1

  4. Pushing the precision limit of ground-based eclipse photometry

    E-Print Network [OSTI]

    M. Gillon; D. R. Anderson; B. -O. Demory; D. M. Wilson; C. Hellier; D. Queloz; C. Waelkens

    2008-06-30

    Until recently, it was considered by many that ground-based photometry could not reach the high cadence sub-mmag regime because of the presence of the atmosphere. Indeed, high frequency atmospheric noises (mainly scintillation) limit the precision that high SNR photometry can reach within small time bins. If one is ready to damage the sampling of his photometric time-series, binning the data (or using longer exposures) allows to get better errors, but the obtained precision will be finally limited by low frequency noises. To observe several times the same planetary eclipse and to fold the photometry with the orbital period is thus generally considered as the only option to get very well sampled and precise eclipse light curve from the ground. Nevertheless, we show here that reaching the sub-mmag sub-min regime for one eclipse is possible with a ground-based instrument. This has important implications for transiting planets characterization, secondary eclipses measurement and small planets detection from the ground.

  5. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  6. Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade

    SciTech Connect (OSTI)

    Brzezniak, J.; Fast, R.W.; Krempetz, K.

    1994-05-01

    This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

  7. Secondary emission electron gun using external primaries

    DOE Patents [OSTI]

    Srinivasan-Rao, Triveni (Shoreham, NY); Ben-Zvi, Ilan (Setauket, NY); Kewisch, Jorg (Wading River, NY); Chang, Xiangyun (Middle Island, NY)

    2007-06-05

    An electron gun for generating an electron beam is provided, which includes a secondary emitter. The secondary emitter includes a non-contaminating negative-electron-affinity (NEA) material and emitting surface. The gun includes an accelerating region which accelerates the secondaries from the emitting surface. The secondaries are emitted in response to a primary beam generated external to the accelerating region. The accelerating region may include a superconducting radio frequency (RF) cavity, and the gun may be operated in a continuous wave (CW) mode. The secondary emitter includes hydrogenated diamond. A uniform electrically conductive layer is superposed on the emitter to replenish the extracted current, preventing charging of the emitter. An encapsulated secondary emission enhanced cathode device, useful in a superconducting RF cavity, includes a housing for maintaining vacuum, a cathode, e.g., a photocathode, and the non-contaminating NEA secondary emitter with the uniform electrically conductive layer superposed thereon.

  8. Secondary emission electron gun using external primaries

    DOE Patents [OSTI]

    Srinivasan-Rao, Triveni (Shoreham, NY); Ben-Zvi, Ilan (Setauket, NY)

    2009-10-13

    An electron gun for generating an electron beam is provided, which includes a secondary emitter. The secondary emitter includes a non-contaminating negative-electron-affinity (NEA) material and emitting surface. The gun includes an accelerating region which accelerates the secondaries from the emitting surface. The secondaries are emitted in response to a primary beam generated external to the accelerating region. The accelerating region may include a superconducting radio frequency (RF) cavity, and the gun may be operated in a continuous wave (CW) mode. The secondary emitter includes hydrogenated diamond. A uniform electrically conductive layer is superposed on the emitter to replenish the extracted current, preventing charging of the emitter. An encapsulated secondary emission enhanced cathode device, useful in a superconducting RF cavity, includes a housing for maintaining vacuum, a cathode, e.g., a photocathode, and the non-contaminating NEA secondary emitter with the uniform electrically conductive layer superposed thereon.

  9. Technology Section of the White Paper on the Status and Future of Ground-based TeV Gamma-ray Astronomy

    E-Print Network [OSTI]

    K. Byrum; J. Buckley; S. Bugayov; B. Dingus; S. Fegan; S. Funk; E. Hays; J. Holder; D. Horan; A. Konopelko; H. Krawczynski; F. Krennrich; S. Lebohec; G. Sinnis; A. Smith; V. Vassiliev; S. Wakely

    2008-10-24

    This is a report on the findings of the technology working group for the white paper on the status and future of TeV gamma-ray astronomy. The white paper is an APS commissioned document, and the overall version has also been released and can be found on astro-ph. This detailed section of the white paper discusses different technology opportunities and the technical feasibility for substantially improving IACTS and ground based particle detectors to achieve an order of magnitude better sensitivity than the instruments employed today as well as their planned upgrades. A technology roadmap for improving IACTS and ground based particle detectors is presented.

  10. Technology Section of the White Paper on the Status and Future of Ground-based TeV Gamma-ray Astronomy

    E-Print Network [OSTI]

    Byrum, K; Bugayov, S; Dingus, B; Fegan, S; Funk, S; Hays, E; Holder, J; Horan, D; Konopelko, A; Krawczynski, H; Krennrich, F; Lebohec, S; Sinnis, G; Smith, A; Vasilev, V; Wakely, S

    2008-01-01

    This is a report on the findings of the technology working group for the white paper on the status and future of TeV gamma-ray astronomy. The white paper is an APS commissioned document, and the overall version has also been released and can be found on astro-ph. This detailed section of the white paper discusses different technology opportunities and the technical feasibility for substantially improving IACTS and ground based particle detectors to achieve an order of magnitude better sensitivity than the instruments employed today as well as their planned upgrades. A technology roadmap for improving IACTS and ground based particle detectors is presented.

  11. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  12. A recommended course of action for upgrading Garduda Operations Control Systems

    E-Print Network [OSTI]

    Mathaisel, Dennis F. X.

    1995-01-01

    Introduction: The purpose of this document is to construct a recommended course of action in the next year for Garuda Operations Control in its efforts to upgrade its information systems technology. The process of installing ...

  13. EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

  14. Rigorous Simulation Model of Kerogen Pyrolysis for the In-situ Upgrading of Oil Shales 

    E-Print Network [OSTI]

    Lee, Kyung Jae

    2014-10-09

    Oil shale is a vast, yet untapped energy source, and the pyrolysis of kerogen in the oil shales releases recoverable hydrocarbons. In this dissertation, we investigate how to increase process efficiency and decrease the costs of in-situ upgrading...

  15. Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...

    Broader source: Energy.gov (indexed) [DOE]

    the Perni Youth Center. For many small businesses with already tight budgets, energy efficiency upgrades aren't always a top priority. This was the case for the Pemi Youth Center...

  16. Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  17. Technical Barriers, Gaps,and Opportunities Related to Home Energy Upgrade Market Delivery

    SciTech Connect (OSTI)

    Bianchi, Marcus V.A.

    2011-11-01

    This report outlines the technical barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's Building America program.

  18. Participation as an end versus a means : understanding a recurring dilemma in urban upgrading

    E-Print Network [OSTI]

    Fallavier, Pierre

    2007-01-01

    Since the 1920s, participatory approaches to urban upgrading in developing nations have demonstrated that involving the urban poor in the physical, social, and economic development of their settlements could improve their ...

  19. All that glitters is not gold : unexpected lessons from a slum upgrading program in Brazil

    E-Print Network [OSTI]

    Zuin, Valentina

    2005-01-01

    This paper looks at the Ribeira Azul Slum Upgrading Program in Salvador de Bahia Brazil, implemented by the development agency of the state of Bahia, CONDER, and the Italian NGO Associazione Volontari per il Servizio ...

  20. Using QECBs for Street Lighting Upgrades: Lighting the Way to Lower Energy Bills in San Diego

    Broader source: Energy.gov [DOE]

    Summarizes how the City of San Diego leveraged $13.1 million in qualified energy conservation bonds to increase the size of a street lighting upgrade project. Author: Lawrence Berkeley National Laboratory

  1. Application of power-factor correction in the Tandem Mirror Experiment Upgrade magnet power supply

    SciTech Connect (OSTI)

    Corvin, W.C.

    1981-08-14

    The magnet power supply for the Tandem Mirror Experiment Upgrade (TMX Upgrade) contains 24 groups of dc rectifiers that feed the water-cooled magnets. Each group consists of five or less rectifiers, connected in series. All 24 are current-regulating, using phase-controlled bilateral thyristors in the rectifier transformer primaries. The electric utility system must furnish reactive power to these phase-controlled thyristors as well as to the cmmutating diodes in the rectifier bridges.

  2. CEBAF energy upgrade program including re-work of CEBAF cavities

    SciTech Connect (OSTI)

    Joseph Preble

    2008-02-12

    The Thomas Jefferson National Accelerator Facility, Jefferson Lab, is planning an upgrade of the CEBAF accelerator from a maximum energy of 6 GeV to 12 GeV and from 3 to 4 experimental halls. This paper will discuss the plans for upgrading the energy of the machine which requires improvements of the existing Super Conducting Radio Frequency (SRF) cryomodules and the additions of ten newly designed high performance SRF cryomodules.

  3. DRIVER ACCELERATOR DESIGN FOR THE 10 KW UPGRADE OF THE JEFFERSON LAB IR FEL

    E-Print Network [OSTI]

    DRIVER ACCELERATOR DESIGN FOR THE 10 KW UPGRADE OF THE JEFFERSON LAB IR FEL D. Douglas, S. V, Newport News, VA23606, USA Abstract An upgrade of the Jefferson Lab IR FEL [1] is now un- der construction. It will provide 10 kW output light power in a wavelength range of 2­10 µm. The FEL will be driven by a modest

  4. Electromagnetic and Mechanical Analysis of the Coil Structure for the CLAS12 Torus for 12 GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ghoshal, P. K.; Pastor, O.; Kashy, D.; Schneider, W.; Wiseman, M.; Zarecky, M.; Young, G.; Rode, C.; Elouadrhiri, L.; Burkert, V.

    2014-12-18

    The torus magnet for the CLAS12 spectrometer is a 3.6 T superconducting magnet being designed and built as part of the Jefferson Lab 12 GeV Upgrade. The magnet consists of six coil case assemblies mounted to a cold central hub. The coil case assembly consists of an aluminum case and cover enclosing an epoxy vacuum impregnated coil pack. The coil pack consists of a 117 turn double-pancake winding wrapped with 2 layers of 0.635 mm thick copper cooling sheets. The coil case assembly is cooled by supercritical helium at 4.6 K. This report details the structural analysis of the coilmore »case assembly and the assessment of the coil pack stresses. For the normal operation of the torus magnet, the coil case assembly was analyzed for cool down to 4.6 K and the Lorentz forces at normal operating current. In addition to the normal operating configuration, the coil case assembly was analyzed for Lorentz forces arising from coil misalignment and current imbalances. The allowable stress criteria for the magnet followed the approach of the ASME codes. Primary stresses were limited to the lesser of 2/3 times the yield strength or 1/3 times the ultimate tensile strength. Primary plus secondary stresses were limited to 3 times the primary stress allowable. The analysis was performed using ANSYS Maxwell to calculate the magneto-static loads and ANSYS Mechanical to calculate the stresses.« less

  5. Electromagnetic and Mechanical Analysis of the Coil Structure for the CLAS12 Torus for 12 GeV Upgrade

    SciTech Connect (OSTI)

    Ghoshal, P. K.; Pastor, O.; Kashy, D.; Schneider, W.; Wiseman, M.; Zarecky, M.; Young, G.; Rode, C.; Elouadrhiri, L.; Burkert, V.

    2014-12-18

    The torus magnet for the CLAS12 spectrometer is a 3.6 T superconducting magnet being designed and built as part of the Jefferson Lab 12 GeV Upgrade. The magnet consists of six coil case assemblies mounted to a cold central hub. The coil case assembly consists of an aluminum case and cover enclosing an epoxy vacuum impregnated coil pack. The coil pack consists of a 117 turn double-pancake winding wrapped with 2 layers of 0.635 mm thick copper cooling sheets. The coil case assembly is cooled by supercritical helium at 4.6 K. This report details the structural analysis of the coil case assembly and the assessment of the coil pack stresses. For the normal operation of the torus magnet, the coil case assembly was analyzed for cool down to 4.6 K and the Lorentz forces at normal operating current. In addition to the normal operating configuration, the coil case assembly was analyzed for Lorentz forces arising from coil misalignment and current imbalances. The allowable stress criteria for the magnet followed the approach of the ASME codes. Primary stresses were limited to the lesser of 2/3 times the yield strength or 1/3 times the ultimate tensile strength. Primary plus secondary stresses were limited to 3 times the primary stress allowable. The analysis was performed using ANSYS Maxwell to calculate the magneto-static loads and ANSYS Mechanical to calculate the stresses.

  6. Ammonia removal process upgrade to the Acme Steel Coke Plant

    SciTech Connect (OSTI)

    Harris, J.L. [Acme Steel Co., Chicago, IL (United States). Chicago Coke Plant

    1995-12-01

    The need to upgrade the ammonia removal process at the Acme Steel Coke Plant developed with the installation of the benzene NESHAP (National Emission Standard for Hazardous Air Pollutants) equipment, specifically the replacement of the final cooler. At Acme Steel it was decided to replace the existing open cooling tower type final cooler with a closed loop direct spray tar/water final cooler. This new cooler has greatly reduced the emissions of benzene, ammonia, hydrogen sulfide and hydrogen cyanide to the atmosphere, bringing them into environmental compliance. At the time of its installation it was not fully recognized as to the effect this would have on the coke oven gas composition. In the late seventies the decision had been made at Acme Steel to stop the production of ammonia sulfate salt crystals. The direction chosen was to make a liquid ammonia sulfate solution. This product was used as a pickle liquor at first and then as a liquid fertilizer as more markets were developed. In the fall of 1986 the ammonia still was brought on line. The vapors generated from the operation of the stripping still are directed to the inlet of the ammonia absorber. At that point in time it was decided that an improvement to the cyclical ammonia removal process was needed. The improvements made were minimal yet allowed the circulation of solution through the ammonia absorber on a continuous basis. The paper describes the original batch process and the modifications made which allowed continuous removal.

  7. Performance of the upgraded NSLS beam position monitors

    SciTech Connect (OSTI)

    Nawrocky, R.J.; Keane, J.

    1997-07-01

    The design and initial performance of the original NSLS beam position monitor were described by J. Bittner and R. Biscardi in 1989. The receiver, which processes signals from four button type pick-up electrodes by time-division multiplexing, operates at the third harmonic of the ring rf frequency (158.66 MHz). It has an output bandwidth of about 2 kHz and a dynamic signal range of approximately 36 dB. A total of 92 receivers have been installed in the NSLS X-ray and VUV storage rings for orbit monitoring and for real time feedback. As part of a continuous effort to improve the NSLS storage ring performance, the BPMs as well as other instrumentation systems have also been undergoing upgrades over the past two years to improve their performance. In the BPM, the front end has been modified to prevent saturation of the rf multiplexing switch, the detector operating point was changed to improve output signal linearity, the dynamic range was increased to over 60 dB, and the gain calibration was standardized to 0.5 volts/mm (i.e. 2 {micro}m/mV). This paper describes the BPM modifications and presents some performance data and measurements on stored beam.

  8. Detector development for Jefferson Lab's 12GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qiang, Yi

    2015-05-01

    Jefferson Lab will soon finish its highly anticipated 12 GeV Upgrade. With doubled maximum energy, Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) will enable a new experimental program with substantial discovery potential, addressing important topics in nuclear, hadronic and electroweak physics. In order to take full advantage of the high energy, high luminosity beam, new detectors are being developed, designed and constructed to fit the needs of different physics topics. The paper will give an overview of various new detector technologies to be used for 12 GeV experiments. It will then focus on the development of two solenoid-based spectrometers,more »the GlueX and SoLID spectrometers. The GlueX experiment in Hall D will study the complex properties of gluons through exotic hybrid meson spectroscopy. The GlueX spectrometer, a hermetic detector package designed for spectroscopy and the associated partial wave analysis, is currently in the final stage of construction. Hall A, on the other hand, is developing the SoLID spectrometer to capture the 3D image of the nucleon from semi-inclusive processes and to study the intrinsic properties of quarks through mirror symmetry breaking. Such a spectrometer will have the capability to handle very high event rates while still maintaining a large acceptance in the forward region.« less

  9. Upgrading the performance of groudwater VOC air strippers

    SciTech Connect (OSTI)

    Nelson, A.D. [Rockwell International Corp., Canoga Park, CA (United States); Schmitt, R.J. [EnviroSolve Corp., Agoura Hills, CA (United States); Dickeson, D. [Lantec Products, Inc., Agoura Hills, CA (United States)

    1997-12-31

    Rocketdynes Santa Susana Field Laboratory has been treating groundwater to remove chlorinated solvents since 1987. Six air stripping treatment installations, using vapor-phase carbon to control air emissions, have consistently met effluent quality standards over nine years of operation. In 1995, Rocketdyne embarked on an inspection and maintenance program to thoroughly check tower equipment and packing condition and to improve treatment efficiency using new packing technology now available. Baseline removal efficiency measurements were made on one large-capacity air stripper, which was then shut down for inspection. The original random packing was found to be fouled, and had settled too far below the level of the spray nozzle. The packing was removed, and replaced with a newer, high-efficiency packing. As a result, single-stage removal efficiency for trichloroethylene increased from 98.5% to > 99.60%. Aside from demonstrating the improvement attainable by upgrading the packing media, Rocketdyne`s maintenance program also highlighted the critical importance of proper liquid distribution. At one point, the refurbished air stripper was overpacked, resulting in concentration of the water spray near the center of the packed section. The liquid distribution was found to remain grossly nonuniform even after the water had trickled down over 8.2 meters of packing in a 91-cm diameter column. 4 refs., 1 fig., 5 tabs.

  10. Upgrading scientific capabilities at the High Flux Isotope Reactor

    SciTech Connect (OSTI)

    West, C.D.; Farrar, M.B.

    1997-07-14

    Following termination of the Advanced Neutron Source (ANS) Project, a program of upgrades to the Department of Energy`s High Flux Isotope Reactor (HFIR) was devised by a team of researchers and reactor operators and has been proposed to the department. HFIR is a multipurpose research reactor, commissioned in 1965, with missions in four nationally important areas: isotope production, especially transuranic isotopes; neutron scattering; neutron activation analysis; and irradiation testing of materials. For neutron scattering, there are two major enhancements and several smaller ones. The first is the installation of a small, hydrogen cold neutron source in one of the four existing beam tubes: because of the high reactor power, and the use of new design concepts developed for ANS, the cold source will be as bright as, or brighter than, the Institute Laue Langevin liquid deuterium vertical cold source, although space limitations mean that there will be far fewer cold beams and instruments at HFIR. This project is underway, and the cold source is expected to come on line following an extended shutdown in 1999 to replace the reactor`s beryllium reflector. The second major change proposed would put five thermal neutron guides at an existing beam port and construct a new guide hall to accommodate instruments on these very intense beams.

  11. Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2008-08-11

    The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

  12. ALICE TPC upgrade for High-Rate operations

    E-Print Network [OSTI]

    ,

    2015-01-01

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion...

  13. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  14. Heavy oil upgrading via fluidized bed processing and hydrogenation processing

    SciTech Connect (OSTI)

    Dawson, F.N. Jr. [California Synfuels Research Corp., Palos Verdes, CA (United States)

    1995-09-01

    California is the second largest crude oil producer in the lower 48 states. Nearly half of its production is heavy oil, difficult to transport and costly to refine. Given better methods of processing, production could be expanded. Likewise, huge worldwide reserves of heavy oils could be better exploited if more attractive processing methods were available. Midway Sunset crude at 11.8 API gravity, is a fairly difficult crude to process. It has about 1.5 percent sulfur, a very high nitrogen content, in the range of 0.7--0.8%, and metals of approximately 120--170 ppm, vanadium plus nickel. The authors will be reporting here results of the pilot plant testing to see whether non-catalytic fluid bed cracking technology, operated at low conversion, followed by hydrogenation would be economically attractive. Results suggest that this approach is competitive with delayed coking and with atmospheric resid desulfurization. This approach successfully combines carbon removal and hydrogen addition techniques for heavy oil upgrading. Comparative yields, product quality and economic considerations are reviewed in this study.

  15. Booster Synchrotron RF System Upgrade for SPEAR3

    SciTech Connect (OSTI)

    Park, Sanghyun; Corbett, Jeff; /SLAC

    2012-07-06

    Recent progress at the SPEAR3 includes the increase in stored current from 100 mA to 200 mA and top-off injection to allow beamlines to stay open during injection. Presently the booster injects 3.0 GeV beam to SPEAR3 three times a day. The stored beam decays to about 150 mA between the injections. The growing user demands are to increase the stored current to the design value of 500 mA, and to maintain it at a constant value within a percent or so. To achieve this goal the booster must inject once every few minutes. For improved injection efficiency, all RF systems at the linac, booster and SPEAR3 need to be phase-locked. The present booster RF system is basically a copy of the SPEAR2 RF system with 358.5 MHz and 40 kW peak RF power driving a 5-cell RF cavity for 1.0 MV gap voltage. These requirements entail a booster RF system upgrade to a scaled down version of the SPEAR3 RF system of 476.3 MHz with 1.2 MW cw klystron output power capabilities. We will analyze each subsystem option for their merits within budgetary and geometric space constraints. A substantial portion of the system will come from the decommissioned PEP-II RF stations.

  16. Detector development for Jefferson Lab's 12GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qiang, Yi [JLAB] (ORCID:0000000170267841)

    2015-05-01

    Jefferson Lab will soon finish its highly anticipated 12 GeV Upgrade. With doubled maximum energy, Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) will enable a new experimental program with substantial discovery potential, addressing important topics in nuclear, hadronic and electroweak physics. In order to take full advantage of the high energy, high luminosity beam, new detectors are being developed, designed and constructed to fit the needs of different physics topics. The paper will give an overview of various new detector technologies to be used for 12 GeV experiments. It will then focus on the development of two solenoid-based spectrometers, the GlueX and SoLID spectrometers. The GlueX experiment in Hall D will study the complex properties of gluons through exotic hybrid meson spectroscopy. The GlueX spectrometer, a hermetic detector package designed for spectroscopy and the associated partial wave analysis, is currently in the final stage of construction. Hall A, on the other hand, is developing the SoLID spectrometer to capture the 3D image of the nucleon from semi-inclusive processes and to study the intrinsic properties of quarks through mirror symmetry breaking. Such a spectrometer will have the capability to handle very high event rates while still maintaining a large acceptance in the forward region.

  17. Screening of processing and upgrading schemes. Task 3

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  18. ALICE TPC upgrade for High-Rate operations

    E-Print Network [OSTI]

    Saikat Biswas

    2015-11-08

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion back flow ($<$ 1\\%) other important requirements are good energy resolution (better than 12\\% (sigma) for $^{55}$Fe X-rays) and operational stability.

  19. Process for upgrading wax from Fischer-Tropsch synthesis

    SciTech Connect (OSTI)

    Derr, W.R. Jr.; Garwood, W.E.; Kuo, J.C.; Leib, T.M.; Nace, D.M.; Tabak, S.A.

    1987-08-04

    A processor is described for converting synthesis gas to liquid hydrocarbons comprising the steps of: (a) charging the synthesis gas to a Fischer-Tropsch synthesis conversion zone containing a catalyst providing CO reducing characteristics to produce a waxy hydrocarbon liquid; (b) separating hydrocarbon wax from the waxy liquid; (c) catalytically cracking the wax in a fluidized bed of acid crystalline zeolite at cracking temperature under process conditions requiring a supply of heat to effect cracking, producing olefinic liquid hydrocarbon crackate in the gasoline and distillate boiling range along with olefinic light gas; (d) recovering distillate range hydrocarbons from the liquid crackate; (e) further converting the olefinic gasoline range hydrocarbon crackate and olefinic light gas under oligomerization conditions in contact with a shape selective medium pore acid oligomerization catalyst to upgrade at least a portion of the olefinic crackate and olefinic light gas to distillate range hydrocarbon product and producing by-product light fuel gas; (f) separating the light fuel gas from step (e) and passing the light fuel gas to cracking step (c) to supply heat.

  20. RF System Modeling for the CEBAF Energy Upgrade

    SciTech Connect (OSTI)

    Tomasz Plawski, J. Hovater

    2009-05-01

    An RF system model, based on MATLAB/SIMULINK, has been developed for analyzing the basic characteristics of the low level RF (LLRF) control system being designed for the CEBAF 12 GeV Energy Upgrade. In our model, a typical passband cavity representation is simplified to in-phase and quadrature (I&Q) components. Lorentz Force and microphonic detuning are incorporated as a new quadrature carrier frequency (frequency modulation). Beam is also represented as in-phase and quadrature components and superpositioned with the cavity field vector. Signals pass through two low pass filters, where the cutoff frequency is equal to half of the cavity bandwidth, then they are demodulated using the same detuning frequency. Because only baseband I&Q signals are calculated, the simulation process is very fast when compared to other controller-cavity models. During the design process we successfully analyzed gain requirements vs. field stability for different superconducting cavity microphonic backgrounds and Lorentz Force coefficients. Moreover, we were able to evaluate different types of a LLRF system’s control algorithm: GDR (Generator Driven Resonator) and SEL (Self Excited Loop) [1] as well as klystron power requirements for different cavities and beam loads.

  1. Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992

    SciTech Connect (OSTI)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-12-31

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

  2. MPC and A upgrades at the Institute of Theoretical and Experimental Physics (ITEP)

    SciTech Connect (OSTI)

    Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Baumann, M. [Sandia National Labs., Albuquerque, NM (United States)] [and others

    1998-07-01

    Materials Protection, Control and Accounting (MPC and A) equipment upgrades are complete at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of weapons-potential nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the US-Russian program to upgrade MPC and A systems. An initial site visit and assessment were conducted in September 1996 to establish communication between ITEP, the US Department of Energy (DOE), and participating US National Laboratories. Subsequently, an agreement was reached to develop two master plans for MPC and A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) assisted in developing a plan for Material Control and Accounting (MC and A) upgrades, and Sandia National Laboratories (SNL) assisted in developing a plan for Physical Protection System (PPS) upgrades. The MC and A plan included MC and A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, portal and hand-held nuclear material monitors, and a nuclear materials accounting system. The PPS plan included basic PPS design training, Central Alarm Station (CAS) relocation and equipment upgrades, a site and critical-building access control system, intrusion detection, alarm assessment, and guard force communications.

  3. Secondary Electron Yield Measurements of Fermilab?s Main Injector Vacuum Vessel

    SciTech Connect (OSTI)

    Scott, D.J.; Capista, D.; Duel, K.L.; Zwaska, R.M.; /Fermilab; Greenwald, S.; Hartung, W.; Li, Y.; Moore, T.P.; Palmer, M.A.; /Cornell U.; Kirby, R.; Pivi, M.; /SLAC

    2012-05-01

    We discuss the progress made on a new installation in Fermilab's Main Injector that will help investigate the electron cloud phenomenon by making direct measurements of the secondary electron yield (SEY) of samples irradiated in the accelerator. In the Project X upgrade the Main Injector will have its beam intensity increased by a factor of three compared to current operations. This may result in the beam being subject to instabilities from the electron cloud. Measured SEY values can be used to further constrain simulations and aid our extrapolation to Project X intensities. The SEY test-stand, developed in conjunction with Cornell and SLAC, is capable of measuring the SEY from samples using an incident electron beam when the samples are biased at different voltages. We present the design and manufacture of the test-stand and the results of initial laboratory tests on samples prior to installation.

  4. Comparative Genome Structure, Secondary Metabolite, and Effector...

    Office of Scientific and Technical Information (OSTI)

    Genome Structure, Secondary Metabolite, and Effector Coding Capacity across Cochliobolus Pathogens Citation Details In-Document Search Title: Comparative Genome Structure,...

  5. Gravitational Wave Detection by Interferometry (Ground and Space)

    E-Print Network [OSTI]

    Pitkin, Matthew; Rowan, Sheila; Hough, Jim

    2011-01-01

    Significant progress has been made in recent years on the development of gravitational wave detectors. Sources such as coalescing compact binary systems, neutron stars in low-mass X-ray binaries, stellar collapses and pulsars are all possible candidates for detection. The most promising design of gravitational wave detector uses test masses a long distance apart and freely suspended as pendulums on Earth or in drag-free craft in space. The main theme of this review is a discussion of the mechanical and optical principles used in the various long baseline systems in operation around the world - LIGO (USA), Virgo (Italy/France), TAMA300 and LCGT (Japan), and GEO600 (Germany/U.K.) - and in LISA, a proposed space-borne interferometer. A review of recent science runs from the current generation of ground-based detectors will be discussed, in addition to highlighting the astrophysical results gained thus far. Looking to the future, the major upgrades to LIGO (Advanced LIGO), Virgo (Advanced Virgo), LCGT and GEO600 ...

  6. Gravitational Wave Detection by Interferometry (Ground and Space)

    E-Print Network [OSTI]

    Matthew Pitkin; Stuart Reid; Sheila Rowan; Jim Hough

    2011-07-25

    Significant progress has been made in recent years on the development of gravitational wave detectors. Sources such as coalescing compact binary systems, neutron stars in low-mass X-ray binaries, stellar collapses and pulsars are all possible candidates for detection. The most promising design of gravitational wave detector uses test masses a long distance apart and freely suspended as pendulums on Earth or in drag-free craft in space. The main theme of this review is a discussion of the mechanical and optical principles used in the various long baseline systems in operation around the world - LIGO (USA), Virgo (Italy/France), TAMA300 and LCGT (Japan), and GEO600 (Germany/U.K.) - and in LISA, a proposed space-borne interferometer. A review of recent science runs from the current generation of ground-based detectors will be discussed, in addition to highlighting the astrophysical results gained thus far. Looking to the future, the major upgrades to LIGO (Advanced LIGO), Virgo (Advanced Virgo), LCGT and GEO600 (GEO-HF) will be completed over the coming years, which will create a network of detectors with significantly improved sensitivity required to detect gravitational waves. Beyond this, the concept and design of possible future "third generation" gravitational wave detectors, such as the Einstein Telescope (ET), will be discussed.

  7. An experimental study of heating performance and seasonal modeling of vertical U-tube ground coupled heat pumps 

    E-Print Network [OSTI]

    Margo, Randal E.

    1992-01-01

    by circulating the secondary fluid through a pipe buried in the ground. In the heating mode, heat is extracted from the soil by the ground coil and is supplied to the conditioned space via the heat pump's refrigerant cycle. The GCHP is limited only... is the ASHRAE Design/Data Manual [Bose et al. , 1985], This manual also bases ground coil sizing on the line source solution. Deerman [1991] used the constant heat flux cylindrical source solution as a basis for a vertical U-tube simulation program. He used...

  8. Upgrade of the LHC magnet interconnections thermal shielding

    SciTech Connect (OSTI)

    Musso, Andrea; Barlow, Graeme; Bastard, Alain; Charrondiere, Maryline; Deferne, Guy; Dib, Gaëlle; Duret, Max; Guinchard, Michael; Prin, Hervé; Craen, Arnaud Vande; Villiger, Gilles [CERN European Organization for Nuclear Research, Meyrin 1211, Geneva 23, CH (Switzerland); Chrul, Anna [The Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences, ul.Radzikowskiego 152, 31-324 Krakow (Poland); Damianoglou, Dimitrios [NTUA National Technical University of Athens, Heeron Polytechniou 9, 15780 Zografou (Greece); Strychalski, Micha? [Wroclaw University of Technology, Faculty of Mechanical and Power Engineering, Wyb. Wyspianskiego 27, Wroclaw, 50-370 (Poland); Wright, Loren [Lancaster University, Bailrigg, Lancaster, LA1 4YW (United Kingdom)

    2014-01-29

    The about 1700 interconnections (ICs) between the Large Hadron Collider (LHC) superconducting magnets include thermal shielding at 50-75 K, providing continuity to the thermal shielding of the magnet cryostats to reduce the overall radiation heat loads to the 1.9 K helium bath of the magnets. The IC shield, made of aluminum, is conduction-cooled via a welded bridge to the thermal shield of the adjacent magnets which is actively cooled. TIG welding of these bridges made in the LHC tunnel at installation of the magnets induced a considerable risk of fire hazard due to the proximity of the multi-layer insulation of the magnet shields. A fire incident occurred in one of the machine sectors during machine installation, but fortunately with limited consequences thanks to prompt intervention of the operators. LHC is now undergoing a 2 years technical stop during which all magnet's ICs will have to be opened to consolidate the magnet electrical connections. The IC thermal shields will therefore have to be removed and re-installed after the work is completed. In order to eliminate the risk of fire hazard when re-welding, it has been decided to review the design of the IC shields, by replacing the welded bridges with a mechanical clamping which also preserves its thermal function. An additional advantage of this new solution is the ease in dismantling for maintenance, and eliminating weld-grinding operations at removal needing radioprotection measures because of material activation after long-term operation of the LHC. This paper describes the new design of the IC shields and in particular the theoretical and experimental validation of its thermal performance. Furthermore a status report of the on-going upgrade work in the LHC is given.

  9. Ground control for highwall mining

    SciTech Connect (OSTI)

    Zipf, R.K.; Mark, C.

    2007-09-15

    Perhaps the greatest risk to both equipment and personnel associated with highwall mining is from ground control. The two most significant ground control hazards are rock falls from highwall and equipment entrapment underground. In the central Appalachians, where the majority of highwall mining occurs in the USA, hillseams (or mountain cracks) are the most prominent structure that affects highwall stability. The article discusses measures to minimise the risk of failure associated with hillstreams. A 'stuck' or trapped highwall miner, and the ensuring retrieval or recovery operation, can be extremely disruptive to the highwall mining process. Most entrapment, are due to roof falls in the hole. The options for recovery are surface retrieval, surface excavation or underground recovery. Proper pillar design is essential to maintain highwall stability and prevent entrapments. NIOSH has developed the Analysis of Retreat Mining Pillar stability-Highwall Mining (ARMPS-HWM) computer program to help mine planners with this process. 10 figs.

  10. Improved multiImproved multiaircraft ground aircraft ground Improved multiImproved multi aircraft ground aircraft ground trajectory prediction through wind trajectory prediction through wind

    E-Print Network [OSTI]

    Baehr, Christophe

    ground aircraft ground trajectory prediction through wind trajectory prediction through wind forecast forecastLocal correction to wind forecast ­ Use aircraft as moving wind sensors ­ Spatiotemporal correlation of wind forecast errorp p · Difficulty: ­ Extract available information from radar tracks

  11. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    SciTech Connect (OSTI)

    Saraev, O. [Beloyarsk Nuclear Power Plant, Zarechny (Russian Federation); Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Mikkelsen, K.; Heinberg, C. [Pacific Northwest National Labs., Richland, WA (United States); Showalter, R.; Soo Hoo, M. [Sandia National Labs., Albuquerque, NM (United States); Hatcher, C.; Forehand, M. [Los Alamos National Lab., NM (United States)

    1998-08-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers.

  12. Progress on the upgrade of the CMS Hadron Calorimeter Front-End electronics

    SciTech Connect (OSTI)

    Anderson, Jake; Whitmore, Juliana; /Fermilab

    2011-11-01

    We present a scheme to upgrade the CMS HCAL front-end electronics in the second long shutdown to upgrade the LHC (LS2), which is expected to occur around 2018. The HCAL electronics upgrade is required to handle the major instantaneous luminosity increase (up to 5 * 10{sup 34} cm{sup -2} s{sup -1}) and an expected integrated luminosity of {approx}3000 fb{sup -1}. A key aspect of the HCAL upgrade is to read out longitudinal segmentation information to improve background rejection, energy resolution, and electron isolation at the L1 trigger. This paper focuses on the requirements for the new electronics and on the proposed solutions. The requirements include increased channel count, additional timing capabilities, and additional redundancy. The electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ASIC ADC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design, and improvements in the overall readout architecture. We will report on the progress of the designs for these upgraded systems, along with performance requirements and initial design studies.

  13. North Village Ground Source Heat Pumps

    Broader source: Energy.gov [DOE]

    Overview: Installation of Ground Source Heat Pumps. Replacement of Aging Heat Pumps. Alignment with Furmans Sustainability Goals.

  14. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    SciTech Connect (OSTI)

    Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

  15. Conceptual design report: Neutrino physics after the Main Injector upgrade

    SciTech Connect (OSTI)

    Bernstein, R.; Beverly, L.; Browning, F.; Childress, S.; Freeman, W.; Jacobsen, V.; Koizumi, G.; Krider, J.; Kula, L.; Malensek, A.; Pordes, Stephen H.; /Fermilab /Ohio State U.

    1991-01-01

    The Main Injector will provide an unprecedented opportunity for challenging the Standard Model. The increased fluxes available from this essential upgrade make possible neutrino experiments of great power both at the Tevatron and at intermediate energies. With a factor of six increase in flux, experiments at higher energies probe with great sensitivity the electroweak sector, test QCD, and search for rare processes which could point the way to new physics. Such experiments can make simultaneous measurements of the Standard Model {rho} parameter and sin{sup 2} {theta}{sub W} to 0.25% and 0.6%, respectively. Measurements of the radiative corrections in electroweak physics will reveal physics at the TeV mass scale. {rho} probes the Higgs sector, and deviations from its expected value would be unambiguous signals of new phenomena and possibly our first clear window into physics beyond the Standard Model. Another way to quantify these corrections is through measurements of sin{sup 2} {theta}{sub W} in different processes; comparisons among an ensemble of precise electroweak measurements can then distinguish among alternatives and pin down the sources of new phenomena. Four processes likely to be important in the coming decade are the direct boson mass measurements, Z polarization asymmetries, atomic parity violation, and neutrino-nucleon scattering. Each of these processes has a different dependence on the various sources of new physics: such phenomena as multiple Z's, supersymmetry, or technicolor are just three of many possibilities. Neutral current measurements of sin{sup 2} {theta}{sub W} and {rho} have already provided constraints on m{sub t}; improved measurements will extend their reach and help us interpret the information from the colliders. QCD tests, especially those involving the structure function xF{sub 3}, can check two fundamental predictions of the theory: the dependence of the strong-coupling constant {alpha}{sub S}(Q{sup 2}) on Q{sup 2}, and the value (and Q{sup 2} dependence) of R{sub QCD} = {sigma}{sub L}/{sigma}{sub T}. A Main Injector experiment will check the scaling violation of the theory and provide solid measurements of the gluon distributions.

  16. Scanning facility to irradiate mechanical structures for the LHC upgrade programme

    E-Print Network [OSTI]

    Dervan, P; Hodgson, P; Marin-Reyes, H; Parker, K; Wilson, J; Baca, M

    2015-01-01

    The existing luminosity of the LHC will be increased in stages to a factor of 10 above its current level (HL-LHC) by 2022. This planned increase in luminosity results in significantly higher levels of radiation inside the proposed ATLAS Upgrade detector. This means existing detector technologies together with new components and materials need to be re-examined to evaluate their performance and durability at these higher fluences. Of particular interest is the effect of radiation on the upgraded ATLAS tracker. To study these effects a new ATLAS irradiation scanning facility has been developed using the Medical Physics Cyclotron at the University of Birmingham. The intense cyclotron beams allow irradiated samples to receive in minutes fluences corresponding to years of operation at the HL-LHC. Since commissioning in early 2013, this facility has been used to irradiate silicon sensors, optical components and carbon fibre sandwiches for the ATLAS upgrade programme. Irradiations of silicon sensors and passive mate...

  17. LHC luminosity upgrade with large Piwinski angle scheme: a recent look

    SciTech Connect (OSTI)

    Bhat, C.M.; Zimmermann, f.; /CERN

    2011-09-01

    Luminosity upgrade at the LHC collider using longitudinally flat bunches in combination with the large crossing angle (large Piwinski angle scheme) is being studied with renewed interest in recent years. By design, the total beam-beam tune shift at the LHC is less than 0.015 for two interaction points together. But the 2010-11 3.5 TeV collider operation and dedicated studies indicated that the beam-beam tune shift is >0.015 per interaction point. In view of this development we have revisited the requirements for the Large Piwinski Angle scheme at the LHC. In this paper we present a new set of parameters and luminosity calculations for the desired upgrade by investigating: (1) current performance of the LHC injectors, (2) e-cloud issues on nearly flat bunches and (3) realistic beam particle distributions from longitudinal beam dynamics simulations. We also make some remarks on the needed upgrades on the LHC injector accelerators.

  18. Upgrading Fischer-Tropsch LPG (liquefied petroleum gas) with the Cyclar process

    SciTech Connect (OSTI)

    Gregor, J.H.; Gosling, C.D.; Fullerton, H.E.

    1989-04-28

    The use of the UOP/BP Cyclar{reg sign} process for upgrading Fischer-Tropsch (F-T) liquefied petroleum gas (LPG) was studied at UOP{reg sign}. The Cyclar process converts LPG into aromatics. The LPG derived from F-T is highly olefinic. Two routes for upgrading F-T LPG were investigated. In one route, olefinic LPG was fed directly to a Cyclar unit (Direct Cyclar). The alternative flow scheme used the Huels CSP process to saturate LPG olefins upstream of the Cyclar unit (Indirect Cyclar). An 18-run pilot plant study verified that each route is technically feasible. An economic evaluation procedure was designed to choose between the Direct and Indirect Cyclar options for upgrading LPG. Four situations involving three different F-T reactor technologies were defined. The main distinction between the cases was the degree of olefinicity, which ranged between 32 and 84 wt % of the fresh feed. 8 refs., 80 figs., 44 tabs.

  19. STATUS OF DIAMOND SECONDARY EMISSION ENHANCED PHOTOCATHODE

    SciTech Connect (OSTI)

    RAO,T.; BEN-ZVI, I.; CHANG, X.; GRIMES, J.; GROVER, R.; ISAKOVIC, A.; SMEDLEY, J.; TODD, R.; WARREN, J.; WU, Q.

    2007-05-25

    The diamond secondary emission enhanced photocathode (SEEP) provides an attractive alternative for simple photo cathodes in high average current electron injectors. It reduces the laser power required to drive the cathode, simultaneously isolating the cathode and the FW cavity from each other, thereby protecting them from contamination and increasing their life time. In this paper, we present the latest results on the secondary electron yield using pulsed thermionic and photo cathodes as primary electron sources, shaping the diamond using laser ablation and reactive ion etching as well as the theoretical underpinning of secondary electron generation and preliminary results of modeling.

  20. Field-scale estimation of volumetric water content using ground-penetrating radar ground wave techniques

    E-Print Network [OSTI]

    Hubbard, Susan

    Field-scale estimation of volumetric water content using ground- penetrating radar ground wave] Ground-penetrating radar (GPR) ground wave techniques were applied to estimate soil water content travel time measurements using 900 and 450 MHz antennas and analyzed these data to estimate water content

  1. Intercampus Student Information System (iSiS) Upgrade-Go Live The University of Massachusetts Lowell is pleased to announce that the iSiS Application upgrade

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    Intercampus Student Information System (iSiS) Upgrade- Go Live The University of Massachusetts Lowell is pleased to announce that the iSiS Application upgrade has been successfully completed. All end to http://isis.uml.edu 2. Click the appropriate log in button. The choices are: · Student Self

  2. 340 Facility Secondary Containment and Leak Detection Project W-302 Functional Design Criteria

    SciTech Connect (OSTI)

    Stordeur, R.T.

    1995-03-01

    This functional design criteria for the upgrade to the 340 radioactive liquid waste storage facility (Project W-302) specifically addresses the secondary containment issues at the current vault facility of the 340 Complex. This vault serves as the terminus for the Radioactive Liquid Waste System (RLWS). Project W-302 is necessary in order to bring this portion of the Complex into full regulatory compliance. The project title, ``340 Facility Secondary Containment and Leak Detection``, illustrates preliminary thoughts of taking corrective action directly upon the existing vault (such as removing the tanks, lining the vault, and replacing tanks). However, based on the conclusion of the engineering study, ``Engineering Study of the 300 Area Process Wastewater Handling System``, WHC-SD-WM-ER-277 (as well as numerous follow-up meetings with cognizant staff), this FDC prescribes a complete replacement of the current tank/vault system. This offers a greater array of tanks, and provides greater operating flexibility and ease of maintenance. This approach also minimizes disruption to RLWS services during ``tie-in``, as compared to the alternative of trying to renovate the old vault. The proposed site is within the current Complex area, and maintains the receipt of RLWS solutions through gravity flow.

  3. The Use of TaBoRR as a Heavy Oil Upgrader

    SciTech Connect (OSTI)

    Lee Brecher; Charles Mones

    2009-02-05

    Preliminary testing has shown that Western Research Institute's (WRI) Tank Bottom Recovery and Remediation (TaBoRR{reg_sign}) technology shows promise for heavy oil upgrading. Approximately 70 to 75 wt% of a Canadian Cold Lake bitumen feed was converted to a partially upgraded overhead product that could be transported directly by pipeline or blended with the parent bitumen to produce transportable crude. TaBoRR{reg_sign} was originally developed to remediate tank bottom wastes by producing a distillate product and solid waste. TaBoRR{reg_sign}'s processing steps include breaking a water-oil emulsion, recovering a light hydrocarbon fraction by distillation in a stripper unit, and pyrolyzing the residua reducing it to additional overhead and a benign coke for disposal. Cold Lake bitumen was tested in WRI's bench-scale equipment to evaluate the potential use of TaBoRR{reg_sign} technology for heavy oil upgrading to produce a stable, partially (or fully) upgraded product that will allow diluent-reduced or diluent-free transportation of bitumen or ultra-heavy crudes to market. Runs were conducted at temperatures of low, intermediate and high severity in the stripper to produce stripper overhead and bottoms. The bottoms from each of these runs were processed further in a 6-inch screw pyrolyzer to produce pyrolyzer overhead for blending with the corresponding stripper overheads. Proceeding in this fashion yielded three partially upgraded crudes. The products from TaBoRR{reg_sign} processing, the parent bitumen, and bitumen blends were subjected to stability and compatibility testing at the National Centre for Upgrading Technology (NCUT). Chemical analyses of the overhead product blends have met pipeline specifications for viscosity and density; however the bromine number does not, which might indicate the need for mild hydrotreating. Storage stability tests showed the blends to be stable. The blends were also soluble and compatible with most other Alberta crudes.

  4. Canted Undulator Upgrade for GeoSoilEnviroCARS Sector 13 at the Advanced Photon Source

    SciTech Connect (OSTI)

    Sutton, Stephen

    2013-02-02

    Support for the beamline component of the canted undulator upgrade of Sector 13 (GeoSoilEnviroCARS; managed and operated by the University of Chicago) at the Advanced Photon Source (APS; Argonne National Laboratory) was received from three agencies (equally divided): NASA-SRLIDAP (now LARS), NSF-EAR-IF (ARRA) and DOE-Single Investigator Small Group (SISGR). The associated accelerator components (undulators, canted front end) were provided by the APS using DOE-ARRA funding. The intellectual merit of the research enabled by the upgrade lies in advancing our knowledge of the composition, structure and properties of earth materials; the processes they control; and the processes that produce them. The upgrade will facilitate scientific advances in the following areas: high pressure mineral physics and chemistry, non-crystalline and nano-crystalline materials at high pressure, chemistry of hydrothermal fluids, reactions at mineral-water interfaces, biogeochemistry, oxidation states of magmas, flow dynamics of fluids and solids, and cosmochemistry. The upgrade, allowing the microprobe to operate 100% of the time and the high pressure and surface scattering and spectroscopy instruments to receive beam time increases, will facilitate much more efficient use of the substantial investment in these instruments. The broad scientific community will benefit by the increase in the number of scientists who conduct cutting-edge research at GSECARS. The user program in stations 13ID-C (interface scattering) and 13ID-D (laser heated diamond anvil cell and large volume press) recommenced in June 2012. The operation of the 13ID-E microprobe station began in the Fall 2012 cycle (Oct.-Dec 2012). The upgraded canted beamlines double the amount of undulator beam time at Sector 13 and provide new capabilities including extended operations of the X-ray microprobe down to the sulfur K edge and enhanced brightness at high energy. The availability of the upgraded beamlines will advance the research being conducted at Sector 13.

  5. Technical Barriers, Gaps, and Opportunities Related to Home Energy Upgrade Market Delivery

    SciTech Connect (OSTI)

    Bianchi, M. V. A.

    2011-11-01

    This report outlines the technical barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's Building America program. The objective of this report is to outline the technical1 barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's (DOE) Building America program. This information will be used to provide guidance for new research necessary to enable the success of the approaches. Investigation for this report was conducted via publications related to home energy upgrade market delivery approaches, and a series of interviews with subject matter experts (contractors, consultants, program managers, manufacturers, trade organization representatives, and real estate agents). These experts specified technical barriers and gaps, and offered suggestions for how the technical community might address them. The potential benefits of home energy upgrades are many and varied: reduced energy use and costs; improved comfort, durability, and safety; increased property value; and job creation. Nevertheless, home energy upgrades do not comprise a large part of the overall home improvement market. Residential energy efficiency is the most complex climate intervention option to deliver because the market failures are many and transaction costs are high (Climate Change Capital 2009). The key reasons that energy efficiency investment is not being delivered are: (1) The opportunity is highly fragmented; and (2) The energy efficiency assets are nonstatus, low-visibility investments that are not properly valued. There are significant barriers to mobilizing the investment in home energy upgrades, including the 'hassle factor' (the time and effort required to identify and secure improvement works), access to financing, and the opportunity cost of capital and split incentives.

  6. The Phase-1 Upgrade of the ATLAS First Level Calorimeter Trigger

    E-Print Network [OSTI]

    Schwienhorst, Reinhard; The ATLAS collaboration

    2015-01-01

    The ATLAS level-1 calorimeter trigger pursues a series of upgrades in order to face the challenges posed by the upcoming increase of the LHC luminosity. The hardware built during the Phase-1 upgrade will be installed in 2018. The calorimeter data will be available with a tenfold increase of granularity which allows to employ more sophisticated identification algorithms. To cope with this increase of input data, an entirely new custom electronics processing system will be built exploiting the technological advances in the design of complex PCBs, powerful FPGAs, new crate technologies and high speed optical interconnects.

  7. Nb3Sn quadrupoles in the LHC IR Phase I upgrade

    SciTech Connect (OSTI)

    Zlobin, A.V.; Johnstone, J.A.; Kashikhin, V.V.; Mokhov, N.V.; Rakhno, I.L.; de Maria, R.; Peggs, S.; Robert-Demolaize, G.; Wanderer, P.; /Brookhaven

    2008-06-01

    After a number of years of operation at nominal parameters, the LHC will be upgraded to a higher luminosity. This paper discusses the possibility of using a limited number of Nb{sub 3}Sn quadrupoles for hybrid optics layouts for the LHC Phase I luminosity upgrades with both NbTi and Nb{sub 3}Sn quadrupoles. Magnet parameters and issues related to using Nb{sub 3}Sn quadrupoles including aperture, gradient, magnetic length, field quality, operation margin, et cetera are discussed.

  8. Nb3Sn Quadrupoles in the LHC IR Phase I Upgrade

    SciTech Connect (OSTI)

    Zlobin,A.; Johnstone, J.; Kashikhin, V.; Mokhov, N.; Rakhno, I.; deMaria, R.; Peggs, S.; Robert-Demolaize, F.; Wanderer, P.

    2008-06-23

    After a number of years of operation at nominal parameters, the LHC will be upgraded for higher luminosity. This paper discusses the possibility of using a limited number of Nb{sub 3}Sn quadrupoles for hybrid optics layouts for the LHC Phase I luminosity upgrades with both NbTi and Nb{sub 3}Sn quadrupoles. Magnet parameters and issues related to using Nb{sub 3}Sn quadrupoles including aperture, gradient, magnetic length, field quality, operation margin, et cetera are discussed.

  9. The Phase-1 Upgrade of the ATLAS First Level Calorimeter Trigger

    E-Print Network [OSTI]

    Schwienhorst, Reinhard; The ATLAS collaboration

    2015-01-01

    The ATLAS level-1 calorimeter trigger pursues a series of upgrades in order to face the challenges posed by the upcoming increase of the LHC beam energy and luminosity. The hardware built during the Phase-1 upgrade will be installed in 2018. The calorimeter data will be available with a tenfold increase of granularity which allows to employ more sophisticated identification algorithms. To cope with this increase of input data, an entirely new custom electronics processing system will be built exploiting the technological advances in the design of complex PCBs, powerful FPGAs, new crate technologies and high speed optical interconnects.

  10. ATF CO{sub 2} laser system upgrade to terawatt peak power

    SciTech Connect (OSTI)

    Pogorelsky, I.V.

    1995-05-01

    This document describes the proposed upgrade of the 10-GW peak power 50-ps CO{sub 2} laser presently operational at the ATF to the 1 TW level at a shorter, 3--10 ps, pulse duration. The approach adopted is based on state of the art CO{sub 2} laser technology and an experience gained in the course of the ATF laser design and application for the laser accelerator experiment. The proposed upgrade is an economical way for the ATF to become in a short time among leading users facilities available for next generation ({ge} 100 MeV) laser accelerator studies.

  11. X-ray crystal spectrometer upgrade for ITER-like wall experiments at JET

    SciTech Connect (OSTI)

    Shumack, A. E.; Rzadkiewicz, J.; Chernyshova, M.; Czarski, T.; Karpinski, L.; Jakubowska, K.; Scholz, M.; Byszuk, A.; Cieszewski, R.; Kasprowicz, G.; Pozniak, K.; Wojenski, A.; Zabolotny, W.; Dominik, W.; Conway, N. J.; Dalley, S.; Tyrrell, S.; Zastrow, K.-D.; Figueiredo, J. [EFDA-CSU, Culham Science Centre, Abingdon OX14 3DB; Associação EURATOM and others

    2014-11-15

    The high resolution X-Ray crystal spectrometer at the JET tokamak has been upgraded with the main goal of measuring the tungsten impurity concentration. This is important for understanding impurity accumulation in the plasma after installation of the JET ITER-like wall (main chamber: Be, divertor: W). This contribution provides details of the upgraded spectrometer with a focus on the aspects important for spectral analysis and plasma parameter calculation. In particular, we describe the determination of the spectrometer sensitivity: important for impurity concentration determination.

  12. Dual array 3D electron cyclotron emission imaging at ASDEX Upgrade

    SciTech Connect (OSTI)

    Classen, I. G. J., E-mail: I.G.J.Classen@differ.nl; Bogomolov, A. V. [FOM-Institute DIFFER, Dutch Institute for Fundamental Energy Research, 3430 BE Nieuwegein (Netherlands); Domier, C. W.; Luhmann, N. C. [Department of Applied Science, University of California at Davis, Davis, California 95616 (United States); Suttrop, W.; Boom, J. E. [Max-Planck-Institut für Plasmaphysik, Boltzmannstraße 2, 85748 Garching (Germany); Tobias, B. J. [Princeton Plasma Physics Laboratory, Princeton, New Jersey 08540 (United States); Donné, A. J. H. [FOM-Institute DIFFER, Dutch Institute for Fundamental Energy Research, 3430 BE Nieuwegein (Netherlands); Department of Applied Physics, Eindhoven University of Technology, 5600 MB Eindhoven (Netherlands)

    2014-11-15

    In a major upgrade, the (2D) electron cyclotron emission imaging diagnostic (ECEI) at ASDEX Upgrade has been equipped with a second detector array, observing a different toroidal position in the plasma, to enable quasi-3D measurements of the electron temperature. The new system will measure a total of 288 channels, in two 2D arrays, toroidally separated by 40 cm. The two detector arrays observe the plasma through the same vacuum window, both under a slight toroidal angle. The majority of the field lines are observed by both arrays simultaneously, thereby enabling a direct measurement of the 3D properties of plasma instabilities like edge localized mode filaments.

  13. Habit tic deformity secondary to guitar playing

    E-Print Network [OSTI]

    Wu, Jashin J

    2009-01-01

    KA. Treatment of habit- tic deformity with fluoxetine. ArchHabit tic deformity secondary to guitar playing Jashin J Wuchanges similar to the habit tic deformity may be produced

  14. UNIVERSITY OF LOUISIANA AT LAFAYETTE SECONDARY CREDENTIALS FOR INTERNATIONAL FRESHMEN

    E-Print Network [OSTI]

    Kearfott, R. Baker

    OF CREDENTIAL Barbados Caribbean Advanced Proficiency Examination (CAPE) Caribbean Secondary Education Certificate (CSEC) Barbados Secondary School Certificate Part I General Certificate of Education ­ Advanced

  15. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  16. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Karen Johnson; Nitin Bharadwaj

    1990-01-01

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  17. No. 5 blast furnace 1995 reline and upgrade

    SciTech Connect (OSTI)

    Kakascik, T.F. Jr.

    1996-12-31

    The 1995 reline of No. 5 Blast Furnace is an undertaking which has never been approached in previous relines of any blast furnace in the history of Wheeling Pittsburgh Steel Corporation. The scope of the project is such that it represents a radical departure from W.P.S.C.`s traditional methods of ironmaking. The reline of No. 5 Blast Furnace is one of the largest capital improvements performed at W.P.S.C. Blast Furnaces. The improvements made at one single time are taking a furnace from 1960`s technology into the 21st century. With this in mind, employee training was one of the largest parts of the project. Training for the automated stockhouse, castfloor, new skip drive, new instrumentation, new castfloor equipment, hydraulics and overall furnace operation were an absolute necessity. The reline has laid the ground work to give the Corporation an efficient, higher productive, modern Blast Furnace which will place W.P.S.C. in the world class category in ironmaking well into the 21st century.

  18. Flathead Electric Cooperative Facility Geothermal Heat Pump System Upgrade

    SciTech Connect (OSTI)

    Liu, Xiaobing

    2014-06-01

    High initial cost and lack of public awareness of ground source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights findings of a case study of one of the ARRA-funded GSHP demonstration projects, which is a heating only central GSHP system using shallow aquifer as heat source and installed at a warehouse and truck bay at Kalispell, MT. This case study is based on the analysis of measured performance data, utility bills, and calculations of energy consumptions of conventional central heating systems for providing the same heat outputs as the central GSHP system did. The evaluated performance metrics include energy efficiency of the heat pump equipment and the overall GSHP system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of GSHP system compared with conventional heating systems. This case study also identified areas for reducing uncertainties in performance evaluation, improving operational efficiency, and reducing installed cost of similar GSHP systems in the future. Publication of ASHRAE at the annual conference in Seattle.

  19. Scientific Upgrades at the Oak Ridge National Laboratory High Flux Isotope Reactor

    SciTech Connect (OSTI)

    Selby, Douglas L [ORNL; Jones, Amy [ORNL; Crow, Lowell [ORNL

    2012-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

  20. Development of Hydrothermal Liquefaction and Upgrading Technologies for Lipid-Extracted Algae Conversion to Liquid Fuels

    SciTech Connect (OSTI)

    Zhu, Yunhua; Albrecht, Karl O.; Elliott, Douglas C.; Hallen, Richard T.; Jones, Susanne B.

    2013-10-01

    Bench-scale tests were performed for lipid-extracted microalgae (LEA) conversion to liquid fuels via hydrotreating liquefaction (HTL) and upgrading processes. Process simulation and economic analysis for a large-scale LEA HTL and upgrading system were developed based on the best available test results. The system assumes an LEA feed rate of 608 dry metric ton/day and that the feedstock is converted to a crude HTL bio-oil and further upgraded via hydrotreating and hydrocracking to produce liquid hydrocarbon fuels, mainly alkanes. Performance and cost results demonstrate that HTL would be an effective option to convert LEA to liquid fuel. The liquid fuels annual yield was estimated to be 26.9 million gallon gasoline-equivalent and the overall energy efficiency at higher heating value basis was estimated to be 69.5%. The minimum fuel selling price (MFSP) was estimated to be $0.75/L with LEA feedstock price at $33.1 metric ton at dry basis and 10% internal rate of return. A sensitivity analysis indicated that the largest effects to production cost would come from the final products yields and the upgrading equipments cost. The impact of plant scale on MFSP was also investigated.

  1. EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPA’s Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

  2. SOLAR UPGRADE OF METHANE USING DRY REFORMING IN DIRECT CONTACT BUBBLE REACTOR

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    SOLAR UPGRADE OF METHANE USING DRY REFORMING IN DIRECT CONTACT BUBBLE REACTOR Khalid Al-Ali 1 , Kodama S. 1 , Kaneko H. 1 , Sekiguchi H. 1 , Tamaura Y. 1 and Chiesa M. 2 1 Department of Chemical, in an alkali carbonate based molten salt system containing suspended Ni-Al2O3 catalyst. A thermodynamical

  3. Cryogenic Test of Double Quarter Wave Crab Cavity for the LHC High Luminosity Upgrade

    E-Print Network [OSTI]

    Xiao, B; Belomestnykh, S; Ben-Zvi, I; Calaga, Rama; Cullen, C; Capatina, Ofelia; Hammons, L; Li, Z; Marques, C; Skaritka, J; Verdú-Andres, S; Wu, Q

    2015-01-01

    A Proof-of-Principle (PoP) Double Quarter Wave Crab Cavity (DQWCC) was designed and fabricated for the Large Hadron Collider (LHC) luminosity upgrade. A vertical cryogenic test has been done at Brookhaven National Lab (BNL). The cavity achieved 4.5 MV deflecting voltage with a quality factor above 3×109 . We report the test results of this design.

  4. Engineering analysis of a power upgrade for the Texas A&M Nuclear Science Center Reactor 

    E-Print Network [OSTI]

    Rearden, Bradley Thomas

    1995-01-01

    Heat transfer, neutronics, and accident analyses are presented to support an increase of the power level of the Texas A&M University Nuclear Science Center Reactor. The upgraded steady state power level is to be 1.49 MW, from the current level of 1...

  5. Approval of CD-2 for the National Spherical Torus Experiment (NSTX) Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    of compact and high normalized pressure "spherical torus" (ST) magnetic fusion plasmas. The compact Plasma Physics Laboratory DOE Princeton Site Office (SSO) Office of Science Office of Fusion Energy Selection and Cost Range for the NSTX Upgrade Project was approved by the Associate Director for Fusion

  6. Modeling and Control of Flexible HEV Charging Station upgraded with Flywheel Energy Storage

    E-Print Network [OSTI]

    Vasquez, Juan Carlos

    1 Modeling and Control of Flexible HEV Charging Station upgraded with Flywheel Energy Storage reserves. A power balancing strategy based on a local energy storage system (ESS) is proposed in this paper], [8]. The aim of this paper is to address the problem by intro- ducing a dedicated energy storage

  7. Wind Turbine Shutdowns and Upgrades in Denmark: Timing Decisions and the Impact of Government Policy

    E-Print Network [OSTI]

    Lin, C.-Y. Cynthia

    Wind Turbine Shutdowns and Upgrades in Denmark: Timing Decisions and the Impact of Government structural econometric model of wind turbine owners' decisions about whether and when to add new turbines to a pre-existing stock, scrap an existing turbine, or replace old turbines with newer versions (i

  8. Modelling Tools for Wind Farm Upgrading Hans Georg Beyer*, Bernhard Lange, Hans-Peter Waldl

    E-Print Network [OSTI]

    Heinemann, Detlev

    Modelling Tools for Wind Farm Upgrading Hans Georg Beyer*, Bernhard Lange, Hans-Peter Waldl Section-Antipolis, France ABSTRACT: Planning of modifications of existing wind farms by adding or replacing turbines makes new demands on wind farm modelling. Emphasis shifts from the calculation of the mean efficiency

  9. Comparison of Different Arc Detection Methods during Plasma Operations with ICRF Heating on ASDEX Upgrade

    SciTech Connect (OSTI)

    D'Inca, R.; Assas, S.; Bobkov, V.; Braun, F.; Eckert, B.; Noterdaeme, J.-M.

    2007-09-28

    The Sub-Harmonic Arc Detection (SHAD) system used on ASDEX-Upgrade has been designed with the double objective to detect arcs on the ICRF system and to discriminate them from plasma transients like ELMs. This preliminary study focuses on the achievement of these requirements by analyzing and comparing the behavior of the SHAD with existing arc detectors in operation on AUG.

  10. http://depts.washington.edu/rppl/presentations/index.html The TCS Upgrade

    E-Print Network [OSTI]

    Washington at Seattle, University of

    discharge cleaning - Wall Gettering Samples in & out Plasma electron energy analyzer (CMA) G at e V al v e 3 of the TCS upgrade FRCs at RPPL · FRC's have potential to make near ideal reactor - linear, high beta flux w/o sustainment (LSX) or cold low flux steady state (RMF) · Present approach at RPPL: Improve

  11. The Fiber Optic Multiplexed Upgraded Thomson Scattering Diagnostic for the ISTTOK Tokamak

    E-Print Network [OSTI]

    The Fiber Optic Multiplexed Upgraded Thomson Scattering Diagnostic for the ISTTOK Tokamak M. P by different length optical fibers used to relay the scattered light to a single spectrometer. 2. Thomson vessel and opposite to the collection lenses. Figure 1 shows the present two fiber optic Thomson

  12. Performance history and upgrades for the DIII-D gyrotron complex

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Lohr, J.; Anderson, J. P.; Cengher, M.; Ellis, R. A.; Gorelov, Y. A.; Kolemen, E.; Lambot, T.; Murakami, D. D.; Myrabo, L.; Noraky, S.; et al

    2015-03-12

    The gyrotron installation on the DIII-D tokamak has been in operation at the second harmonic of the electron cyclotron resonance since the mid-1990s. Prior to that a large installation of ten 60 GHz tubes was operated at the fundamental resonance. The system has been upgraded regularly and is an everyday tool for experiments on DIII-D.

  13. Combined L1 Trigger Tracker studies for HL-LHC upgrade 

    E-Print Network [OSTI]

    Dimas Valle, Jose Roberto Roberto

    2014-09-24

    needed for the studies on the Higgs sector. The upgrade also includes improvements on the detectors sensitivity to rare processes presenting signs of new physics, which could hold keys to the origins of dark matter and baryon asymmetry in the Universe...

  14. AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades

    E-Print Network [OSTI]

    to 35 years old and ready for upgrades to heating, ventilation and air conditioning systems, which make and the air sealing of the attic," he said. "Once you do that, you spend less on your heating and air was insulated with material packed under the attic floor, above which a cooling unit was located. In the second

  15. 3rd ITPA SOL and Divertor Topical Group meeting, St. Petersburg, July 2003 ASDEX Upgrade

    E-Print Network [OSTI]

    3rd ITPA SOL and Divertor Topical Group meeting, St. Petersburg, July 2003 ASDEX Upgrade Arne for power balance A. Kallenbach, 3rd ITPA SOL and Divertor Topical Group meeting, St. Petersburg, July 2003 ms spatial resolution 1-2 mm #12;divertor geometries A. Kallenbach, 3rd ITPA SOL and Divertor Topical

  16. Magnetic Diagnostics For Equilibrium Reconstruction And Realtime Plasma Control In NSTX-Upgrade

    SciTech Connect (OSTI)

    Gerhardt, Stefan P.; Erickson, Keith; Kaita, Robert; Lawson, John; Mozulay, Robert; Mueller, Dennis; Que, Weiguo; Rahman, Nabidur; Schneider, Hans; Smalley, Gustav; Tresemer, Kelsey

    2014-06-01

    This paper describes aspects of magnetic diagnostics for realtime control in NSTX-U. The sensor arrangement on the upgraded center column is described. New analog and digital circuitry for processing the plasma current rogowski data are presented. An improved algorithm for estimating the plasma vertical velocity for feedback control is presented.

  17. Fabrication and Testing Status of CEBAF 12 GeV Upgrade Cavities

    SciTech Connect (OSTI)

    Marhauser, F; Davis, G K; Forehand, D; Grenoble, C; Hogan, J; Overton, R B; Reilly, A V; Rimmer, R A

    2011-09-01

    The 12 GeV upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) is under way. All cavities have been built by industry and are presently undergoing post-processing and final low and high power qualification before cryomodule assembly. The status is reported including fabrication-related experiences, observations and issues throughout production, post-processing and qualification.

  18. Gate Reliability Assessment for a Spillway Upgrade Design in Queensland, Australia USSD 2006 Conference Page 1

    E-Print Network [OSTI]

    Bowles, David S.

    then completed using risk-based design criteria to validate the design, and construction is in progress throughout Australia, the standard of safety was evaluated using a risk-based design validation modelGate Reliability Assessment for a Spillway Upgrade Design in Queensland, Australia USSD 2006

  19. Promising Technology: Ground Source Heat Pumps

    Broader source: Energy.gov [DOE]

    Ground source heat pumps (GSHP) use the constant temperature of the Earth as the heat exchange medium instead of the outside air temperature. During the winter, a GSHP uses the ground as a heat source to provide heating, and during the summer, a GSHP uses the ground as a heat sink to provide cooling. Although more expensive than air-source heat pumps, GSHP’s are much more efficient, especially in cold temperatures.

  20. Earth resistivity measurement near substation ground grids

    SciTech Connect (OSTI)

    Lodwig, S.G.; Mateja, S.A. [ComEd, Chicago, IL (United States)

    1996-11-01

    Proper substation grounding grid design requires good, accurate soil resistivity measurements. This data is essential to model the substation ground grid to design a safe ground grid with a satisfactory ground grid resistance at minimum cost. For substations with several decades of service, there is some concern that a grid may have deteriorated, been damaged during equipment installation or excavation, or that initial soil resistivity measurements were lost or may not have been correctly performed. Ground grid conductors change the substation surface voltage distribution. Any voltage measurements taken at the complete substation will also vary from the tests made without conductors present. During testing, current was injected in the soil by probes placed near the ground grid. The current tends to follow the ground grid conductors since copper is a far better conductor than the soil it is placed in. Resistance readings near grids will be lower than readings in undisturbed soil. Since computer models were unavailable for many years, analyzing the effect of the grid conductors on soil resistivity measurements was very difficult. As a result, soil resistivity measurements made close to substations were of little use to the engineer unless some means of correcting the measured values could be developed. This paper will present results of soil resistivity measurements near a substation ground grid before and after a ground grid has been installed and describes a means of calculating the undisturbed soil model.

  1. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  2. Hybrid-secondary uncluttered induction machine

    DOE Patents [OSTI]

    Hsu, John S. (Oak Ridge, TN)

    2001-01-01

    An uncluttered secondary induction machine (100) includes an uncluttered rotating transformer (66) which is mounted on the same shaft as the rotor (73) of the induction machine. Current in the rotor (73) is electrically connected to current in the rotor winding (67) of the transformer, which is not electrically connected to, but is magnetically coupled to, a stator secondary winding (40). The stator secondary winding (40) is alternately connected to an effective resistance (41), an AC source inverter (42) or a magnetic switch (43) to provide a cost effective slip-energy-controlled, adjustable speed, induction motor that operates over a wide speed range from below synchronous speed to above synchronous speed based on the AC line frequency fed to the stator.

  3. Secondary Charmonium Production at LHC Energy

    E-Print Network [OSTI]

    P. Braun-Munzinger; K. Redlich

    1999-08-06

    We consider the production of charmonium by $D\\bar D$ annihilation during the mixed and hadronic phase of Pb-Pb collision at LHC energy. The calculations for secondary $J/\\psi$ and $\\psi^,$ production are performed within a kinetic model taking into account the space-time evolution of a longitudinally and transversely expanding medium. It is shown that the yield of secondary $J/\\psi$ mesons depends strongly on the $J/\\psi$ dissociation cross section with co-moving hadrons. Within the most likely scenario for the dissociation cross section it will be negligible. The secondary production of $\\psi^,$ mesons, however, due to their large cross section above the threshold, can substantially exceed the primary yield.

  4. Stepped frequency ground penetrating radar

    DOE Patents [OSTI]

    Vadnais, Kenneth G. (Ojai, CA); Bashforth, Michael B. (Buellton, CA); Lewallen, Tricia S. (Ventura, CA); Nammath, Sharyn R. (Santa Barbara, CA)

    1994-01-01

    A stepped frequency ground penetrating radar system is described comprising an RF signal generating section capable of producing stepped frequency signals in spaced and equal increments of time and frequency over a preselected bandwidth which serves as a common RF signal source for both a transmit portion and a receive portion of the system. In the transmit portion of the system the signal is processed into in-phase and quadrature signals which are then amplified and then transmitted toward a target. The reflected signals from the target are then received by a receive antenna and mixed with a reference signal from the common RF signal source in a mixer whose output is then fed through a low pass filter. The DC output, after amplification and demodulation, is digitized and converted into a frequency domain signal by a Fast Fourier Transform. A plot of the frequency domain signals from all of the stepped frequencies broadcast toward and received from the target yields information concerning the range (distance) and cross section (size) of the target.

  5. System for detecting and limiting electrical ground faults within electrical devices

    DOE Patents [OSTI]

    Gaubatz, Donald C. (Cupertino, CA)

    1990-01-01

    An electrical ground fault detection and limitation system for employment with a nuclear reactor utilizing a liquid metal coolant. Elongate electromagnetic pumps submerged within the liquid metal coolant and electrical support equipment experiencing an insulation breakdown occasion the development of electrical ground fault current. Without some form of detection and control, these currents may build to damaging power levels to expose the pump drive components to liquid metal coolant such as sodium with resultant undesirable secondary effects. Such electrical ground fault currents are detected and controlled through the employment of an isolated power input to the pumps and with the use of a ground fault control conductor providing a direct return path from the affected components to the power source. By incorporating a resistance arrangement with the ground fault control conductor, the amount of fault current permitted to flow may be regulated to the extent that the reactor may remain in operation until maintenance may be performed, notwithstanding the existence of the fault. Monitors such as synchronous demodulators may be employed to identify and evaluate fault currents for each phase of a polyphase power, and control input to the submerged pump and associated support equipment.

  6. Pyrolysis of Woody Residue Feedstocks: Upgrading of Bio-Oils from Mountain-Pine-Beetle-Killed Trees and Hog Fuel

    SciTech Connect (OSTI)

    Zacher, Alan H.; Elliott, Douglas C.; Olarte, Mariefel V.; Santosa, Daniel M.; Preto, Fernando; Iisa, Kristiina

    2014-12-01

    Liquid transportation fuel blend-stocks were produced by pyrolysis and catalytic upgrading of woody residue biomass. Mountain pine beetle killed wood and hog fuel from a saw mill were pyrolyzed in a 1 kg/h fluidized bed reactor and subsequently upgraded to hydrocarbons in a continuous fixed bed hydrotreater. Upgrading was performed by catalytic hydrotreatment in a two-stage bed at 170°C and 405°C with a per bed LHSV between 0.17 and 0.19. The overall yields from biomass to upgraded fuel were similar for both feeds: 24-25% despite the differences in bio-oil (intermediate) mass yield. Pyrolysis bio-oil mass yield was 61% from MPBK wood, and subsequent upgrading of the bio-oil gave an average mass yield of 41% to liquid fuel blend stocks. Hydrogen was consumed at an average of 0.042g/g of bio-oil fed, with final oxygen content in the product fuel ranging from 0.31% to 1.58% over the course of the test. Comparatively for hog fuel, pyrolysis bio-oil mass yield was lower at 54% due to inorganics in the biomass, but subsequent upgrading of that bio-oil had an average mass yield of 45% to liquid fuel, resulting in a similar final mass yield to fuel compared to the cleaner MPBK wood. Hydrogen consumption for the hog fuel upgrading averaged 0.041 g/g of bio-oil fed, and the final oxygen content of the product fuel ranged from 0.09% to 2.4% over the run. While it was confirmed that inorganic laded biomass yields less bio-oil, this work demonstrated that the resultant bio-oil can be upgraded to hydrocarbons at a higher yield than bio-oil from clean wood. Thus the final hydrocarbon yield from clean or residue biomass pyrolysis/upgrading was similar.

  7. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  8. Ground Loops for Heat Pumps and Refrigeration 

    E-Print Network [OSTI]

    Braud, H. J.

    1986-01-01

    Ground loops are used for water source heat pumps. Refrigeration can be put on a ground loop. Water-cooled condensing units are more efficient than air-cooled, and they can be put indoors. Indoor location makes piping for desuperheater hot water...

  9. Ground water provides drinking water, irrigation for

    E-Print Network [OSTI]

    Saldin, Dilano

    they join tributaries to the Mississippi River. · The deep ground water divide is the underground boundary Deep ground water divide Racine Kenosha Walworth Waukesha Washington Ozaukee Milwaukee LAKE MICHIGANGround water provides drinking water, irrigation for crops and water for indus- tries. It is also

  10. Versatile secondary beam for the meson area

    SciTech Connect (OSTI)

    Kirk, T.

    1982-03-01

    A new secondary beam design is outlined for the Meson M6 Beamline that combines versatility with economy. The beamline described will transport charged particles of either sign to 800 GeV/c and bring the beam to a focus in one of three potential experimental areas. The plan makes maximal use of existing civil construction.

  11. Department for Education: Secondary School Accountability Consultation

    E-Print Network [OSTI]

    Rambaut, Andrew

    aspects of schools' performance cannot easily be measured but are nevertheless important. School1 Department for Education: Secondary School Accountability Consultation Response by the Wellcome for schools. We have embarked on a programme of work to help improve school governance ­ details can be found

  12. URI WILENSKY STATISTICAL MECHANICS FOR SECONDARY SCHOOL

    E-Print Network [OSTI]

    Wilensky, Uri

    , is made accessible to these students through the medium of a computer-based modeling environment, Net exploring and constructing computer-based models of that content. This paper presents a case study of a high of a secondary teacher and students constructing and exploring NetLogo models of statistical mech- anical

  13. SECONDARY FIELD PETITION FORM Department of Psychology

    E-Print Network [OSTI]

    SECONDARY FIELD PETITION FORM Department of Psychology This form is to be used for any course substantial overlap with the material covered in Psychology 1900 or Stat 100/101/102/104. Attach a statement and a syllabus. Courses taken elsewhere (transfer students only): Petitions for psychology courses taken

  14. Computational Chemistry with RNA Secondary Structures

    E-Print Network [OSTI]

    Stadler, Peter F.

    consider Hammet's classical theory of substituent e#ects expressed in terms of # and # parameters, see e structures --- structural alignments and pattern search --- give rise to algorithmic solutions that are close, only the DNA or RNA sequence and the list of base pairs enter our considerations. A secondary structure

  15. Upgrading of substandard housing in Portugal : planning strategies for the technical improvement of marginal settlements, case study, the Casal Ventoso

    E-Print Network [OSTI]

    De Castello-Branco, Fernando N. B

    1983-01-01

    The primary scope of this thesis is to deal, from a technical standpoint, with the implementation of the upgrading concept in marginal settlements in Portugal. It consists mainly of two parts: The rationale of the concept, ...

  16. The 1,000 dollar home : a scalable business model to build disaster relief dwellings and upgrade slums

    E-Print Network [OSTI]

    Cañzio, Luis (Del Cañzio)

    2006-01-01

    This thesis proposes a new model for the private markets to build disaster relief dwellings or to upgrade degraded neighborhoods of very low income communities. The study offers a way to empower the dwellers of very poor ...

  17. A Carbon Molecular Sieve-based Catalyst with Encapsulated Ruthenium Nanoparticles for Bio-oil Stabilization and Upgrading

    E-Print Network [OSTI]

    Mironenko, Alexander

    2012-08-31

    Pyrolysis oil derived from biomass (bio-oil) is regarded as a potential substitute for petroleum crude for producing environmentally friendly fuels of the future. However, pyrolysis oil upgrading still remains an issue due to its complex composition...

  18. EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to upgrade the facilities of the U.S. Department of Energy's National Synchrotron Light Source Complex, namely the National Synchrotron...

  19. GEO 600 and the GEO-HF upgrade program: successes and challenges

    E-Print Network [OSTI]

    Dooley, K L; Adams, T; Affeldt, C; Bisht, A; Bogan, C; Degallaix, J; Gräf, C; Hild, S; Hough, J; Khalaidovski, A; Lastzka, N; Lough, J; Lück, H; Macleod, D; Nuttall, L; Prijatelj, M; Schnabel, R; Schreiber, E; Slutsky, J; Sorazu, B; Strain, K A; Vahlbruch, H; Was, M; Willke, B; Wittel, H; Danzmann, K; Grote, H

    2015-01-01

    The German-British laser-interferometric gravitational wave detector GEO 600 is in its 14th year of operation since its first lock in 2001. After GEO 600 participated in science runs with other first-generation detectors, a program known as GEO-HF began in 2009. The goal was to improve the detector sensitivity at high frequencies with technologically advanced yet minimally invasive upgrades. Simultaneously, the detector would record science quality data in between commissioning activities. As of early 2014, all of the planned upgrades have been carried out and sensitivity improvements of up to a factor of four at the high-frequency end of the observation band have been achieved. Besides science data collection, an experimental program is ongoing with the goal to further improve the sensitivity and evaluate future detector technologies. We summarize the results of the GEO-HF program to date and discuss its successes and challenges.

  20. Upgrade of the neutral particle analyzers for the TJ-II stellarator

    SciTech Connect (OSTI)

    Fontdecaba, J. M., E-mail: josepmaria.fontdecaba@ciemat.es; Ros, A.; McCarthy, K. J. [Laboratorio Nacional de Fusión, CIEMAT, Madrid 28040 (Spain); Petrov, S. Ya.; Nesenevich, V. G.; Chernyshev, F. V. [Ioffe Physical-Technical Institute, Saint Petersburg 194024 (Russian Federation); Barcala, J. M. [Departamento de Electrónica, CIEMAT, Madrid 28040 (Spain)

    2014-11-15

    The TJ-II stellarator, a magnetically confined plasma device, is equipped with a broad range of diagnostics for plasma characterization. These include 4 neutral particle analyzers (NPAs), consisting of two Acord-12's, to perform poloidal measurements, plus a compact NPA, and an Acord-24, these in tangential viewing positions. The Acord-12's were originally equipped with two rows of 6 channels each, one for hydrogen neutrals and the other for deuterium neutrals but were changed to a single row of 12 detectors for hydrogen, the principal working gas in TJ-II. With this upgrade the resultant improved energy resolution spectrum has allowed more reliable ion temperature estimates to be obtained. Here we present the upgrades undertaken and present results to demonstrate the improved performance of this diagnostic.

  1. MAK-LCO: MAK light cycle oil upgrading to premium products

    SciTech Connect (OSTI)

    Pappal, D.A.; Lee, C.K. [Mobil Research and Development Corp., Paulsboro, NJ (United States); Goebel, K.W. [M.W. Kellogg Co., Houston, TX (United States); Asim, M.Y. [Akzo-Nobel Chemicals, Inc., Houston, TX (United States)

    1995-09-01

    MAK Light Cycle Oil Upgrading is a moderate-pressure, single-stage hydrocracking process licensed jointly by Mobil, Akzo Nobel/Nippon Ketjen and The M.W. Kellogg Company to upgrade low-value light cycle oil to high-octane gasoline and a high-quality diesel blending component. The new process provides an economic alternative disposition of light cycle oil which is commonly used as a blending component for heavy fuel oils. This paper will present how the process works, including a discussion of process chemistry, pilot plant testing and catalyst development, and how the process can be integrated within an existing refinery configuration. The process configuration will be compared to other LCO processing options such as hydrotreating and high-pressure hydrocracking followed by catalytic reforming.

  2. Design of generic coal conversion facilities: Process release---Refining and upgrading

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The refinery and upgrade process development unit (PDU) is designed to upgrade liquid hydrocarbon products from the direct and indirect liquefaction PDU`s to transportation fuels. The refinery will comprise of the following reactor systems: (a) Hydrotreating (b) Hydrocracking (c) Reforming. The three reactor systems will share common feed preparation, product separation and fractionation sections. The refinery is being designed to operate independently of the other PDU`s. The use of common feed and product handling systems will permit operation of one process reactor system at a time in the refinery. In addition, the hydrotreater and hydrocracker will be operable in series. The process is designed to utilize intermediate storage and maximize the use of equipment.

  3. Proposal for the award of a contract for the upgrade of the SPS cooling towers

    E-Print Network [OSTI]

    2000-01-01

    This document concerns the award of a contract for the upgrade of the SPS cooling towers. Following a market survey carried out among 56 firms in sixteen Member States, a call for tenders (IT-2740/ST/SPS) was sent on 14 February 2000 to 10 firms in six Member States. By the closing date, CERN had received seven tenders from seven firms. The Finance Committee is invited to agree to the negotiation of a contract with SPIG (IT), the lowest bidder, for the upgrade of the SPS cooling towers, for an amount of 1 073 757 Swiss francs, not subject to revision. SPIG has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT-73%; FI-24%; DE-3%.

  4. Design of a Rotatable Copper Collimator for the LHC Phase II Collimation Upgrade

    SciTech Connect (OSTI)

    Smith, Jeffrey Claiborne; Doyle, Eric; Keller, Lewis; Lundgren, Steven; Markiewicz, Thomas Walter; Lari, Luisella; /LPHE, Lausanne

    2010-02-15

    The Phase II upgrade to the LHC collimation system calls for complementing the robust Phase I graphite collimators with high Z, low impedance Phase II collimators. The design for the collimation upgrade has not been finalized. One option is to use metallic rotatable collimators and this design will be discussed here. The Phase II collimators must be robust in various operating conditions and accident scenarios. Design issues include: (1) Collimator jaw deflection and sagitta due to heating must be small when operated in the steady state condition, (2) Collimator jaws must withstand transitory periods of high beam impaction with no permanent damage, (3) Jaws must recover from accident scenario where up to 8 full intensity beam pulses impact on the jaw surface and (4) The beam impedance contribution due to the collimators must be small to minimize coherent beam instabilities.

  5. Prototype Testing for a Copper Rotatable Collimator for the LHC Collimation Upgrade

    SciTech Connect (OSTI)

    Smith, Jeffrey Claiborne; Anzalone, Gene; Doyle, Eric; Keller, Lewis; Lundgren, Steven; Markiewicz, Thomas Walter; Rogers, Reggie; /SLAC

    2009-01-20

    The Phase II upgrade to the LHC collimation system calls for complementing the robust Phase I graphite collimators with high Z Phase II collimators. The design for the collimation upgrade has not been finalized. One option is to use metallic rotatable collimators and testing of this design will be discussed here. The Phase II collimators must be robust in various operating conditions and accident scenarios. A prototype collimator jaw referred to as RC0 has been tested for both mechanical and thermal compliance with the design goals. Thermal expansion bench-top tests are compared to ANSYS simulation results. The prototype has also been tested in vacuum bake-out to confirm compliance with the LHC vacuum spec. CMM equipment has been used to verify the flatness of the jaw surface after heat tests and bake-out.

  6. Low-grade coals: a review of some prospective upgrading technologies

    SciTech Connect (OSTI)

    Hassan Katalambula; Rajender Gupta [University of Alberta, Edmonton, AB (Canada). Department of Chemical and Materials Engineering

    2009-07-15

    There is a growing need of using low-grade coals because of higher quest for power generation. In the present carbon-constrained environment, there is a need of upgrading these coals in terms of moisture, ash, and/or other trace elements. The current paper reviews technologies used mainly categorized as drying for reducing moisture and cleaning the coal for reducing mineral content of coal and related harmful constituents, such as sulfur and mercury. The earliest upgrading of high-moisture lignite involved drying and manufacturing of briquettes. Drying technologies consist of both evaporative and non-evaporative (dewatering) types. The conventional coal cleaning used density separation in water medium. However, with water being a very important resource, conservation of water is pushing toward the development of dry cleaning of coal. There are also highly advanced coal-cleaning technologies that produce ultra-clean coals and produce coals with less than 0.1% of ash. The paper discusses some of the promising upgrading technologies aimed at improving these coals in terms of their moisture, ash, and other pollutant components. It also attempts to present the current status of the technologies in terms of development toward commercialization and highlights on problems encountered. It is obvious that still the upgrading goal has not been realized adequately. It can therefore be concluded that, because reserves for low-grade coals are quite plentiful, it is important to intensify efforts that will make these coals usable in an acceptable manner in terms of energy efficiency and environmental protection. 68 refs., 7 figs.

  7. Silicon strip tracking detector development and prototyping for the Phase-2 Upgrade of the ATLAS experiment

    E-Print Network [OSTI]

    Kuehn, Susanne; The ATLAS collaboration

    2015-01-01

    In about ten years from now, the Phase-2 upgrade of the LHC is planned. This will result in a severe radiation dose and high particle rates for the multipurpose exeperiments because of a foreseen luminosity of ten times higher the LHC design luminosity. Several detector components will have to be upgraded in the experiments. In the ATLAS experiment the current inner detector will be replaced by an all silicon tracking detector aiming for high performance. The poster will present the development and the latest prototyping of the upgrade silicon strip tracking detector. Its layout foresees low mass and modular double-sided structures for the barrel and forward region. Silicon sensors and readout electronics, so-called modules, are planned to be assembled double-sided on larger carbon-core structures. The modularity allows assembly and testing at multiple sites. Many components need to be developed and their prototyping towards full-size components is ongoing. New developments and test results will be presented....

  8. UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY

    SciTech Connect (OSTI)

    Reza Kazimi, Arne Freyberger, Alicia Hofler, Andrew Hutton, Fay Hannon

    2012-07-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

  9. Effect of product upgrading on Fischer-Tropsch indirect coal liquefaction economics

    SciTech Connect (OSTI)

    Choi, G.N.; Kramer, S.J.; Tam, S.S.; Fox, J.M. III

    1995-12-31

    Conceptual plant designs with cost estimates for indirect coal liquefaction technology to produce environmentally acceptable transportation liquid fuels meeting the Clear Air Act requirements were developed for the US Department of Energy (DOE). The designs incorporate the latest development in coal gasification technology and advanced Fischer-Tropsch (F-T) slurry reactor design. ASPEN process simulation models were developed to provide detailed plant material and energy balances, utility requirements, operating and capital costs. A linear programming model based on a typical PADD II refinery was developed to assess the values of the produced F-T products. The results then were used in a discounted cash flow spreadsheet model to examine the effect of key process variables on the overall F-T economics. Different models were developed to investigate the various routes of upgrading the F-T products. The effects of incorporating a close-coupled ZSM-5 reactor to upgrade the vapor stream leaving the Fischer-Tropsch reactor have been reported previously. This paper compares two different schemes of F-T was upgrading, namely fluidized bed catalytic cracking verse mild hydrocracking.

  10. Risk management considerations for seismic upgrading of an older facility for short-term residue stabilization

    SciTech Connect (OSTI)

    Additon, S.L.; Peregoy, W.L.; Foppe, T.L.

    1999-06-01

    Building 707 and its addition, Building 707A, were selected, after the production mission of Rocky Flats was terminated a few years ago, to stabilize many of the plutonium residues remaining at the site by 2002. The facility had undergone substantial safety improvements to its safety systems and conduct of operations for resumption of plutonium operations in the early 1990s and appeared ideally suited for this new mission to support accelerated Site closure. During development of a new authorization basis, a seismic evaluation was performed. This evaluation addressed an unanalyzed expansion joint and suspect connection details for the precast concrete tilt-up construction and concluded that the seismic capacity of the facility is less than half of that determined by previous analysis. Further, potential seismic interaction was identified between a collapsing Building 707 and the seismically upgraded Building 707A, possibly causing the partial collapse of the latter. Both the operating contractor and the Department of Energy sought a sound technical basis for deciding how to proceed. This paper addresses the risks of the as-is facility and possible benefits of upgrades to support a decision on whether to upgrade the seismic capacity of Building 707, accept the risk of the as-is facility for its short remaining mission, or relocate critical stabilization missions. The paper also addresses the Department of Energy`s policy on natural phenomena.

  11. Tile Calorimeter Upgrade Program for the Luminosity Increasing at the LHC

    E-Print Network [OSTI]

    ,

    2015-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at the Large Hadron Collider (LHC). The LHC is scheduled to undergo a major upgrade, in 2022, for the High Luminosity LHC (HL-LHC). The ATLAS upgrade program for high luminosity is split into three phases: Phase-0 occurred during $2013-2014$ and prepared the LHC for Run 2; Phase-I, foreseen for 2019, will prepare the LHC for Run 3, whereafter the peak luminosity reaches $2-3 \\times 10^{34}$ cm$^{2}s^{-1}$; finally, Phase-II, which is foreseen for 2024, will prepare the collider for the HL-LHC operation ($5-7 \\times 10^{34}$ cm$^{2}s^{-1}$). The TileCal main activities for Phase-0 were the installation of the new low voltage power supplies and the activation of the TileCal third layer signal for assisting the muon trigger at $1.01.3$ (TileMuon Project). In Phase-II, a major upgrade in the TileCal readout electronics is planned. Except for the photomultipliers tubes (PMTs), most of the on- and off-detector e...

  12. US - Russian government-to-government MPC&A upgrades at the institute of theoretical and experimental physics

    SciTech Connect (OSTI)

    Haase, M.; Engling, E.; Drayer, D. [and others

    1997-08-01

    Materials Protection, Control, and Accounting (MPC&A) upgrades have begun at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of direct-use nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the U.S.-Russian Government-to-Government program to upgrade MPC&A systems. An initial site visit and assessment was conducted in September 1996 to establish communication between ITEP and the U.S. Department of Energy (DOE) and the participating U.S. national laboratories. Subsequently, the parties reached an agreement to develop two master plans for MPC&A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) would assist in developing a plan for Material Control and Accounting (MC&A) upgrades, and Sandia National Laboratories (SNL) would assist in developing a plan for Physical Protection (PP) upgrades. The MC&A plan included MC&A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, and a nuclear materials accounting system. The PP plan included basic PP system design training, Central Alarm Station (CAS) location and equipment upgrades, site and critical-building access control system, intrusion detection alarm assessment, and guard force communications.

  13. Commonality of ground systems in launch operations

    E-Print Network [OSTI]

    Quinn, Shawn M

    2008-01-01

    NASA is examining the utility of requiring a certain degree of commonality in both flight and ground systems in the Constellation Program. While the benefits of commonality seem obvious in terms of minimizing upfront ...

  14. Building an entanglement measure on physical ground

    E-Print Network [OSTI]

    D. Teresi; A. Napoli; A. Messina

    2008-05-28

    We introduce on physical grounds a new measure of multipartite entanglement for pure states. The function we define is discriminant and monotone under LOCC and moreover can be expressed in terms of observables of the system.

  15. A note on classical ground state energies

    E-Print Network [OSTI]

    Michael K. -H. Kiessling

    2009-05-28

    The pair-specific ground state energy of Newtonian N-body systems grows monotonically in N. This furnishes a whole family of simple new tests for minimality of putative ground state energies obtained through computer experiments. Inspection of several publically available lists of such computer-experimentally obtained putative ground state energies has yielded several dozen instances which failed (at least) one of these tests. Although the correct ground state energy is not revealed by this method, it does yield a better upper bound on it than the experimentally found value whenever the latter fails a monotonicity test. The surveyed N-body systems include in particular N point charges with 2- or 3-dimensional Coulomb pair interactions, placed either on the unit 2-sphere or on a 2-torus (a.k.a. Thomson, Fekete, or Riesz problems).

  16. Ground state terahertz quantum cascade lasers

    E-Print Network [OSTI]

    Hu, Qing

    A terahertz quantum cascade laser (THz QCL) architecture is presented in which only the ground state subbands of each quantum well are involved in the transport and lasing transition. Compared to state-of-the art THz QCLs ...

  17. Ground water protection management program plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

  18. MODELING, VERIFICATION AND OPTIMIZATION OF HYBRID GROUND SOURCE HEAT PUMP

    E-Print Network [OSTI]

    MODELING, VERIFICATION AND OPTIMIZATION OF HYBRID GROUND SOURCE HEAT PUMP SYSTEMS IN ENERGYPLUS, VERIFICATION AND OPTIMIZATION OF HYBRID GROUND SOURCE HEAT PUMP SYSTEMS IN ENERGYPLUS Thesis Approved by: Dr.................................................................................................................... 16 MODELING OF HYBRID GROUND SOURCE HEAT PUMP SYSTEMS IN ENERGYPLUS

  19. The Safety of Sports Grounds (Designation) Order 1992 

    E-Print Network [OSTI]

    Her Majesty's Stationary Office

    1992-03-13

    Article 2 of this Order designates the Sports grounds specified therein as sports grounds requiring safety certificate under the Safety of Sports Ground Act 1975. That Act was amended by Schedule 2 to the Fire Safety and ...

  20. Astrofisica e particelle elementari RC secondari

    E-Print Network [OSTI]

    Roma "La Sapienza", Università di

    · Modulazione solare Bruno Borgia #12;2 RC SECONDARI · Propagazione di particelle in atmosfera descritta da. Difatti se Eµ = 3 GeV si ha 20 km L'energia persa nell'atmosfera è solo per ionizzazione ovvero E/x 2 sezione d'urto inclusiva di una particella k di energia Ek per produrre una particella i con energia Ei

  1. Particle Physics Outreach to Secondary Education

    SciTech Connect (OSTI)

    Bardeen, Marjorie G.; Johansson, K.Erik; Young, M.Jean

    2011-11-21

    This review summarizes exemplary secondary education and outreach programs of the particle physics community. We examine programs from the following areas: research experiences, high-energy physics data for students, informal learning for students, instructional resources, and professional development. We report findings about these programs' impact on students and teachers and provide suggestions for practices that create effective programs from those findings. We also include some methods for assessing programs.

  2. Secondary ion emission under keV carbon cluster bombardment 

    E-Print Network [OSTI]

    Locklear, Jay Edward

    2006-10-30

    Secondary ion mass spectrometry (SIMS) is a surface analysis technique capable of providing isotopic and molecular information. SIMS uses keV projectiles to impinge upon a sample resulting in secondary ion emission from ...

  3. Ecological analysis of secondary metabolite production in Aspergillus spp. 

    E-Print Network [OSTI]

    Ramaswamy, Anitha

    2002-01-01

    A complex and fascinating aspect of fungal development is the production of secondary metabolites. One of the best characterized secondary metabolite pathway is the aflatoxin (AF) and sterigmatocystin (ST) pathway, found in many Aspergillus spp...

  4. Communication Secondary structure of dengue virus type 4

    E-Print Network [OSTI]

    Hanley, Kathryn A.

    Short Communication Secondary structure of dengue virus type 4 39 untranslated region: impact 26 June 2006 Several studies have generated computer-based predictions of secondary structure of the 39 untranslated region (UTR) of Dengue virus (DEN); however, experimental verification

  5. Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems – Success Stories

    Broader source: Energy.gov [DOE]

    This report examines six case studies of photovoltaic (PV) systems integrated into secondary network systems. The six PV systems were chosen for evaluation because they are interconnected to secondary network systems located in four major Solar America Cities.

  6. An Overview of the Louisiana Secondary Wood Products Industry

    E-Print Network [OSTI]

    Wu, Qinglin

    An Overview of the Louisiana Secondary Wood Products Industry Working Paper #1 Louisiana Forest Director Louisiana Furnishings Industry Association Ponchatoula, LA Dr. O. Victor Harding Assistant secondary wood products industry is underway at the Louisiana Forest Products Laboratory, Louisiana State

  7. Secondary ion emission from single massive gold cluster impacts 

    E-Print Network [OSTI]

    Hager, George Joseph

    2007-09-17

    Secondary ion mass spectrometry, SIMS, is one of the most versatile surface analytical techniques. The significant parameter determining the performance of SIMS is the secondary ion yield. Atomic projectiles, traditionally used in SIMS...

  8. Secondary sex ratios and male lifespan: Damaged or culled cohorts

    E-Print Network [OSTI]

    Catalano, Ralph; Bruckner, Tim

    2006-01-01

    9. Lazarus, J. (2002) in Sex Ratios: Concepts and ResearchSecondary sex ratios and male lifespan: Damaged or culledreduce the human secondary sex ratio (i.e. , the odds of a

  9. Perceptions of Cyberbullying from Secondary School Administrators in Texas 

    E-Print Network [OSTI]

    Mitzner, Kris Doreen

    2012-02-14

    This mixed method study examined perceptions and experiences of secondary school administrators in Texas regarding cyberbullying. It was designed to gather quantitative information related to cyberbullying in secondary school campuses in Texas...

  10. Impact of Secondary Users' Field Size on Spectrum Sharing Opportunities

    E-Print Network [OSTI]

    Yanikomeroglu, Halim

    Aramco, Dhahran, Saudi Arabia. spatial size of the field of secondary users. In most studies, the spatial

  11. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    SciTech Connect (OSTI)

    NONE

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility.

  12. Ground Gravity Survey At Dixie Valley Geothermal Area (Allis...

    Open Energy Info (EERE)

    Ground Gravity Survey At Dixie Valley Geothermal Area (Allis, Et Al., 2000) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey...

  13. Ground Gravity Survey At Roosevelt Hot Springs Geothermal Area...

    Open Energy Info (EERE)

    Ground Gravity Survey At Roosevelt Hot Springs Geothermal Area (Faulder, 1991) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  14. Ground Gravity Survey At Neal Hot Springs Geothermal Area (Colwell...

    Open Energy Info (EERE)

    Ground Gravity Survey At Neal Hot Springs Geothermal Area (Colwell, Et Al., 2012) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  15. Ground Gravity Survey At Lake City Hot Springs Area (Warpinski...

    Open Energy Info (EERE)

    Ground Gravity Survey At Lake City Hot Springs Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  16. Ground Gravity Survey At Under Steamboat Springs Area (Warpinski...

    Open Energy Info (EERE)

    Ground Gravity Survey At Under Steamboat Springs Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  17. Ground Gravity Survey At Kilauea East Rift Geothermal Area (FURUMOTO...

    Open Energy Info (EERE)

    Ground Gravity Survey At Kilauea East Rift Geothermal Area (FURUMOTO, 1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey...

  18. Ground Gravity Survey At Kilauea East Rift Geothermal Area (Leslie...

    Open Energy Info (EERE)

    Ground Gravity Survey At Kilauea East Rift Geothermal Area (Leslie, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  19. Ground Gravity Survey At Neal Hot Springs Geothermal Area (U...

    Open Energy Info (EERE)

    Ground Gravity Survey At Neal Hot Springs Geothermal Area (U.S. Geothermal Inc., 2007) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground...

  20. Ground Gravity Survey At Kilauea East Rift Geothermal Area (Broyles...

    Open Energy Info (EERE)

    Ground Gravity Survey At Kilauea East Rift Geothermal Area (Broyles, Et Al., 1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  1. Fuel Cell Council Working Group on Aircraft and Aircraft Ground...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Council Working Group on Aircraft and Aircraft Ground Support Fuel Cell Applications Fuel Cell Council Working Group on Aircraft and Aircraft Ground Support Fuel Cell Applications...

  2. EPA - Ground Water Discharges (EPA's Underground Injection Control...

    Open Energy Info (EERE)

    EPA - Ground Water Discharges (EPA's Underground Injection Control Program) webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Ground Water...

  3. An Updated Site Scale Saturated Zone Ground Water Transport Model...

    Office of Scientific and Technical Information (OSTI)

    An Updated Site Scale Saturated Zone Ground Water Transport Model for Yucca Mountain. Citation Details In-Document Search Title: An Updated Site Scale Saturated Zone Ground Water...

  4. Department of Veterans Affairs, FONSI - Ground mounted solar...

    Office of Environmental Management (EM)

    Ground mounted solar photovoltaic power at San Joaquin National Cemetery Department of Veterans Affairs, FONSI - Ground mounted solar photovoltaic power at San Joaquin National...

  5. Montana Ground Water Pollution Control System Permit Application...

    Open Energy Info (EERE)

    Montana Ground Water Pollution Control System Permit Application Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water...

  6. Ground Gravity Survey At Blue Mountain Geothermal Area (Fairbank...

    Open Energy Info (EERE)

    Ground Gravity Survey At Blue Mountain Geothermal Area (Fairbank Engineering Ltd, 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground...

  7. Data Analysis from Ground Source Heat Pump Demonstration Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis from Ground Source Heat Pump Demonstration Projects Data Analysis from Ground Source Heat Pump Demonstration Projects Comparison of building energy use before and after...

  8. Plant behavioural ecology: dynamic plasticity in secondary metabolites

    E-Print Network [OSTI]

    Aschehoug, Erik

    Plant behavioural ecology: dynamic plasticity in secondary metabolites KERRY L. METLEN, ERIK T induction and attenuation of plant secondary metabolites occur as chemically mediated root foraging, plant growth. Rapid and reversible secondary metabolite production and release is also a key mechanism by which

  9. Application of expert networks for predicting proteins secondary structure

    E-Print Network [OSTI]

    Siegelmann , Hava T

    of proteins secondary structure. We use three independent networks, one for each structure (alpha, beta to be an alternative to the determination of secondary structure by means of free energy minimization, integration of secondary structures (alpha-helix, beta- sheet, and coil) (Nishikawa, 1983; Kabsch and Sander, 1983a

  10. ELM Control at the L-H Transition Achieved by Pellet Pacing in the All-metal Wall Tokamaks ASDEX Upgrade and JET

    E-Print Network [OSTI]

    ELM Control at the L-H Transition Achieved by Pellet Pacing in the All-metal Wall Tokamaks ASDEX Upgrade and JET

  11. Upgrade of the Power Deposition and Thermal Models for the First Wall Protection of JET with an ITER-like Be Combination of Wall

    E-Print Network [OSTI]

    Upgrade of the Power Deposition and Thermal Models for the First Wall Protection of JET with an ITER-like Be Combination of Wall

  12. Interconnecting PV on New York City's Secondary Network Distribution System

    SciTech Connect (OSTI)

    K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

    2009-11-30

    The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ���¢��������networks���¢������� in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1���¢��������PV Deployment Analysis for New York City���¢��������we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2���¢��������A Briefing for Policy Makers on Connecting PV to a Network Grid���¢��������presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3���¢��������Technical Review of Concerns and Solutions to PV Interconnection in New Y

  13. Measuring Bio-Oil Upgrade Intermediates and Corrosive Species with Polarity-Matched Analytical Approaches

    SciTech Connect (OSTI)

    Connatser, Raynella M [ORNL; Lewis Sr, Samuel Arthur [ORNL; Keiser, James R [ORNL; Choi, Jae-Soon [ORNL

    2014-01-01

    Integrating biofuels with conventional petroleum products requires improvements in processing to increase blendability with existing fuels. This work demonstrates analysis techniques for more hydrophilic bio-oil liquids that give improved quantitative and qualitative description of the total acid content and organic acid profiles. To protect infrastructure from damage and reduce the cost associated with upgrading, accurate determination of acid content and representative chemical compound analysis are central imperatives to assessing both the corrosivity and the progress toward removing oxygen and acidity in processed biomass liquids. Established techniques form an ample basis for bio-liquids evaluation. However, early in the upgrading process, the unique physical phases and varied hydrophilicity of many pyrolysis liquids can render analytical methods originally designed for use in petroleum-derived oils inadequate. In this work, the water solubility of the organic acids present in bio-oils is exploited in a novel extraction and titration technique followed by analysis on the water-based capillary electrophoresis (CE) platform. The modification of ASTM D664, the standard for Total Acid Number (TAN), to include aqueous carrier solvents improves the utility of that approach for quantifying acid content in hydrophilic bio-oils. Termed AMTAN (modified Total Acid Number), this technique offers 1.2% relative standard deviation and dynamic range comparable to the conventional ASTM method. The results of corrosion product evaluations using several different sources of real bio-oil are discussed in the context of the unique AMTAN and CE analytical approaches developed to facilitate those measurements. Keywords: biomass, capillary electrophoresis, Total Acid Number, pyrolysis oil upgrading, carboxylic acid, corrosion

  14. Field-scale estimation of volumetric water content using ground-penetrating radar ground wave techniques

    E-Print Network [OSTI]

    Hubbard, Susan

    Field-scale estimation of volumetric water content using ground- penetrating radar ground wave that the GPR estimates had a root mean square error of volumetric water content of the order of 0 agriculture Citation: Grote, K., S. Hubbard, and Y. Rubin, Field-scale estimation of volumetric water content

  15. Nonlinear conformation of secondary protein folding

    E-Print Network [OSTI]

    Januar, M; Handoko, L T

    2012-01-01

    A model to describe the mechanism of conformational dynamics in secondary protein based on matter interactions is proposed. The approach deploys the lagrangian method by imposing certain symmetry breaking. The protein backbone is initially assumed to be nonlinear and represented by the Sine-Gordon equation, while the nonlinear external bosonic sources is represented by $\\phi^4$ interaction. It is argued that the nonlinear source induces the folding pathway in a different way than the previous work with initially linear backbone. Also, the nonlinearity of protein backbone decreases the folding speed.

  16. CARE-HHH-APD Workshop on Finalizing the Roadmap for the Upgrade of the CERN and GSI Accelerator Complex

    E-Print Network [OSTI]

    Zimmermann, Frank; BEAM'07; BEAM 2007; Finalizing the Roadmap for the Upgrade of the LHC and GSI Accelerator Complex

    2008-01-01

    This report contains the Proceedings of the CARE-HHH-APD Event BEAM’07, “Finalizing the Roadmap for the Upgrade of the CERN & GSI Accelerator Complex,” which was held at CERN in Geneva, Switzerland, from 1 to 5 October 2007. BEAM’07 was primarily devoted to beam dynamics limitations for the two, or three, alternative baseline scenarios of the LHC luminosity upgrade and to critical design choices for the upgrade of the LHC injector complex at CERN and for the FAIR complex at GSI. It comprised five parts: (1) a Mini-Workshop on LHC+ Beam Performance, (2) a CERN-GSI Meeting on Collective Effects, (3) the Francesco Ruggiero Memorial Symposium, (4) a Mini-Workshop on the LHC Injectors Upgrade, and (5) the BEAM’07 Summaries. Topics addressed in the first mini-workshop of BEAM’07 ranged from the luminosity performance reach of the upgraded LHC in different scenarios, over the generation and stability of the future LHC beams, the turnaround time, beam–beam effects, luminosity levelling methods, and ...

  17. Upgraded photon calorimeter with integrating readout for Hall A Compton Polarimeter at Jefferson Lab

    SciTech Connect (OSTI)

    Friend, M; Benmokhtar, F; Camsonne, A; Dalton, M; Franklin, G B; Mamyan, V; Michaels, R; Nanda, S; Nelyubin, V; Paschke, K; Quinn, B; Rakhman, A; Souder, P

    2012-06-01

    The photon arm of the Compton polarimeter in Hall A of Jefferson Lab has been upgraded to allow for electron beam polarization measurements with better than 1% accuracy. The data acquisition system (DAQ) now includes an integrating mode, which eliminates several systematic uncertainties inherent in the original counting-DAQ setup. The photon calorimeter has been replaced with a Ce-doped Gd2SiO5 crystal, which has a bright output and fast response, and works well for measurements using the new integrating method at electron beam energies from 1 to 6 GeV.

  18. Upgraded photon calorimeter with integrating readout for Hall A Compton Polarimeter at Jefferson Lab

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Friend, M.; Parno, D.; Benmokhtar, F.; Camsonne, A.; Dalton, M. M.; Franklin, G. B.; Mamyan, V.; Michaels, R.; Nanda, S.; Nelyubin, V.; et al

    2012-06-01

    The photon arm of the Compton polarimeter in Hall A of Jefferson Lab has been upgraded to allow for electron beam polarization measurements with better than 1% accuracy. The data acquisition system (DAQ) now includes an integrating mode, which eliminates several systematic uncertainties inherent in the original counting-DAQ setup. The photon calorimeter has been replaced with a Ce-doped Gd2SiO5 crystal, which has a bright output and fast response, and works well for measurements using the new integrating method at electron beam energies from 1 to 6 GeV.

  19. FMEA on the superconducting torus for the Jefferson Lab 12 GeV accelerator upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ghoshal, Probir K.; Biallas, George H.; Fair, Ruben J.; Rajput-Ghoshal, Renuka; Schneider, William J.; Legg, Robert A.; Kashy, David H.; Hogan, John P.; Wiseman, Mark A.; Luongo, Cesar; et al

    2015-01-16

    As part of the Jefferson Lab 12GeV accelerator upgrade project, Hall B requires two conduction cooled superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration and the second is an actively shielded solenoidal magnet system consisting of 5 coils. Both magnets are to be wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. This paper describes the various failure modes in torus magnet along with the failure modes that could be experienced by the torus and its interaction with the solenoid which is located inmore »close proximity.« less

  20. Research and development of RHIC injection kicker upgrade with nano second FID pulse generator

    SciTech Connect (OSTI)

    Zhang W.; Sandberg, J.; Hahn, H.; Fischer, W.; Liaw, C.J.; Pai, C.; Tuozzolo, J.

    2012-05-20

    Our recent effort to test a 50 kV, 1 kA, 50 ns pulse width, 10 ns pulse rise time FID pulse generator with a 250 ft transmission cable, resistive load, and existing RHIC injection kicker magnet has produced unparalleled results. This is the very first attempt to drive a high strength fast kicker magnet with a nano second high pulsed power (50 MVA) generator for large accelerator and colliders. The technology is impressive. We report here the result and future plan of RHIC Injection kicker upgrade.

  1. Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules

    SciTech Connect (OSTI)

    Davis, G. Kirk; Matalevich, Joseph R.; Wiseman, Mark A.; Powers, Thomas J.

    2012-09-01

    The CEBAF 12 GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. These cryomodules were tested during production to characterize their microphonic response in situ. For several early cryomodules, detailed (vibration) modal studies of the cryomodule string were performed during the assembly process to identify the structural contributors to the measured cryomodule microphonic response. Structural modifications were then modelled, implemented, and verified by subsequent modal testing and in-situ microphonic response testing. Interim and latest results from this multi-stage process will be reviewed.

  2. A Bunch Length Monitor for JLab 12 GeV Upgrade

    SciTech Connect (OSTI)

    Ahmad, Mahmoud Mohamad Ali; Freyberger, Arne P.; Gubeli, Joseph F.; Krafft, Geoffrey A.

    2013-12-01

    A continuous non-invasive bunch length monitor for the 12 GeV upgrade of Jefferson Lab will be used to determine the bunch length of the beam. The measurement will be done at the fourth dipole of the injector chicane at 123 MeV using the coherent synchrotron light emitted from the dipole. The estimated bunch length is 333 fs. A vacuum chamber will be fabricated and a Radiabeam real time interferometer will be used. In this paper, background, the estimated calculations and the construction of the chamber will be discussed.

  3. Greenbelt Homes Pilot Program. Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    SciTech Connect (OSTI)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-22

    The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.

  4. Prototype Active Silicon Sensor in 150 nm HR-CMOS Technology for ATLAS Inner Detector Upgrade

    E-Print Network [OSTI]

    Rymaszewski, Piotr; Breugnon, Patrick; Godiot, Stépahnie; Gonella, Laura; Hemperek, Tomasz; Hirono, Toko; Hügging, Fabian; Krüger, Hans; Liu, Jian; Pangaud, Patrick; Peric, Ivan; Rozanov, Alexandre; Wang, Anqing; Wermes, Norbert

    2016-01-01

    The LHC Phase-II upgrade will lead to a significant increase in luminosity, which in turn will bring new challenges for the operation of inner tracking detectors. A possible solution is to use active silicon sensors, taking advantage of commercial CMOS technologies. Currently ATLAS R&D programme is qualifying a few commercial technologies in terms of suitability for this task. In this paper a prototype designed in one of them (LFoundry 150 nm process) will be discussed. The chip architecture will be described, including different pixel types incorporated into the design, followed by simulation and measurement results.

  5. Prototype Active Silicon Sensor in 150 nm HR-CMOS Technology for ATLAS Inner Detector Upgrade

    E-Print Network [OSTI]

    Piotr Rymaszewski; Marlon Barbero; Patrick Breugnon; Stépahnie Godiot; Laura Gonella; Tomasz Hemperek; Toko Hirono; Fabian Hügging; Hans Krüger; Jian Liu; Patrick Pangaud; Ivan Peric; Alexandre Rozanov; Anqing Wang; Norbert Wermes

    2016-01-04

    The LHC Phase-II upgrade will lead to a significant increase in luminosity, which in turn will bring new challenges for the operation of inner tracking detectors. A possible solution is to use active silicon sensors, taking advantage of commercial CMOS technologies. Currently ATLAS R&D programme is qualifying a few commercial technologies in terms of suitability for this task. In this paper a prototype designed in one of them (LFoundry 150 nm process) will be discussed. The chip architecture will be described, including different pixel types incorporated into the design, followed by simulation and measurement results.

  6. The cosmic ray test of MRPCs for the BESIII ETOF upgrade

    E-Print Network [OSTI]

    Xiaozhuang Wang; Yuekun Heng; Zhi Wu; Cheng Li; Yongjie Sun; Hongliang Dai; Kejun Zhu; Zhenan Liu; Xiaoshan Jiang; Huayi Sheng; Shengsen Sun; Jie Zhang; Ping Cao; Weijia Sun; Siyu Wang; Xiaolu Ji; Jinzhou Zhao; Wenyuan Gong; Mei Ye; Xiaoyan Ma; Mingming Chen; Meihang Xu; Xiaolan Luo

    2015-11-29

    The upgrade of the current BESIII ETOF is carried out with the Multi-gap Resistive Plate Chamber (MRPC)technology, aiming at the overall time resolution of better than 100ps.Thecosmic ray test for the MRPC detectors, together with the new-designed electronics, including Front End Electronics (FEE), TDIG, CTTP, CLOCK and Fast Control boards, was carried out. The main purposes of cosmic ray test are checking the detectors' construction quality, testing the joint operation of the whole system and the performance of the detectors. The noise rate, time measurement are examined specifically. The results of the test indicate that the whole system works well.

  7. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    SciTech Connect (OSTI)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  8. Energy Upgrades to Save Small Arizona Town Big Money | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographic courtesyEducationNevadaSessionToo! |OctoberTrust ofUpgrades

  9. Financing Energy Upgrades for K-12 School Districts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14,Energy 9,UNIVERSITYDepartment of EnergyUpgrades

  10. Hopper OS upgrade and new SW set to default next Wed, Feb 27

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (JournalvivoHigh energyHighland ViewdefaultJulySeptember 2012OS upgrade and

  11. Forthcoming Upgrades to the ARM MMCRs: Improved Radar Processor and Dual-Polarization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journal Article)Forthcoming Upgrades to the ARM MMCRs: Improved Radar

  12. Ground Control for Emplacement Drifts for SR

    SciTech Connect (OSTI)

    Y. Sun

    2000-04-07

    This analysis demonstrates that a satisfactory ground control system can be designed for the Yucca Mountain site, and provides the technical basis for the design of ground support systems to be used in repository emplacement and non-emplacement drifts. The repository ground support design was based on analytical methods using acquired computer codes, and focused on the final support systems. A literature review of case histories, including the lessons learned from the design and construction of the ESF, the studies on the seismic damages of underground openings, and the use of rock mass classification systems in the ground support design, was conducted (Sections 6.3.4 and 6.4). This review provided some basis for determining the inputs and methodologies used in this analysis. Stability of the supported and unsupported emplacement and non-emplacement drifts was evaluated in this analysis. The excavation effects (i.e., state of the stress change due to excavation), thermal effects (i.e., due to heat output from waste packages), and seismic effects (i.e., from potential earthquake events) were evaluated, and stress controlled modes of failure were examined for two in situ stress conditions (k_0=0.3 and 1.0) using rock properties representing rock mass categories of 1 and 5. Variation of rock mass units such as the non-lithophysal (Tptpmn) and lithophysal (Tptpll) was considered in the analysis. The focus was on the non-lithophysal unit because this unit appears to be relatively weaker and has much smaller joint spacing. Therefore, the drift stability and ground support needs were considered to be controlled by the design for this rock unit. The ground support systems for both emplacement and non-emplacement drifts were incorporated into the models to assess their performance under in situ, thermal, and seismic loading conditions. Both continuum and discontinuum modeling approaches were employed in the analyses of the rock mass behavior and in the evaluation of the stability of the openings. No credit or account was given for the initial ground support in modeling the final ground support systems for both emplacement and non-emplacement drifts in this analysis.

  13. SIMULATION AND OPTIMAL CONTROL OF HYBRID GROUND SOURCE HEAT

    E-Print Network [OSTI]

    SIMULATION AND OPTIMAL CONTROL OF HYBRID GROUND SOURCE HEAT PUMP SYSTEMS By XIAOWEI XU Bachelor #12;ii SIMULATION AND OPTIMAL CONTROL OF HYBRID GROUND SOURCE HEAT PUMP SYSTEMS Dissertation Approved of Vertical Ground Loop Heat Exchangers - Analytical....... 21 2.1.1.2 Modeling of Vertical Ground Loop Heat

  14. DEVELOPMENTS IN GROUND WATER HYDROLOGY : AN OVERVIEW C. P. Kumar

    E-Print Network [OSTI]

    Kumar, C.P.

    of the ground water and the energy requirement for its withdrawal impose restriction on exploitation of ground of ground water is conspicuous during period of drought. 2.0 GROUND WATER SITUATION IN INDIA1 India Central and Southern India is occupied by a variety of hard rocks with hard sediments (including carbonate

  15. FIFTY YEARS OF GROUND-MOTION MODELS John Douglas1

    E-Print Network [OSTI]

    model for the prediction of earthquake ground motions accounting for both magnitude and distance called: ground-motion models or ground- motion prediction equations (GMPEs), but originally were referred a month and at the last count the total number of equations for the prediction of peak ground acceleration

  16. Using Qualified Energy Conservation Bonds for Public Building Upgrades. Reducing Energy Bills in the City of Philadelphia

    SciTech Connect (OSTI)

    Zimring, Mark

    2012-07-18

    Qualified Energy Conservation Bonds (QECBs) are federally-subsidized bonds that enable state, tribal, and local government issuers to borrow money to fund a range of energy conservation projects, including public building upgrades that reduce energy use by at least 20 percent, at very attractive borrowing rates and long terms. As part of the American Recovery and Reinvestment Act (ARRA), the City of Philadelphia received a $15 million QECB award from the U.S. Department of the Treasury (Treasury). The city leveraged $6.25 million of its QECB allocation to finance half of a $12.6 million initiative to upgrade the energy efficiency of City buildings. The upgrades to four city facilities are expected to deliver over $10 million of net savings, and are a major step towards achieving the city’s goal of reducing government energy consumption by 30 percent by 2015.

  17. GROUND-BASED FACILITIES REVIEW CONSULTATIVE DOCUMENT

    E-Print Network [OSTI]

    Crowther, Paul

    has been withdrawal from the AAO and significant reduction in the running costs at ING and JAC the benefits of joining ESO. Initially the UK decided to enter the 8-metre era by joining the Gemini wavebands, and needing both space and ground-based facilities to achieve new science goals. It also stresses

  18. Photovoltaic module mounting clip with integral grounding

    DOE Patents [OSTI]

    Lenox, Carl J.

    2010-08-24

    An electrically conductive mounting/grounding clip, usable with a photovoltaic (PV) assembly of the type having an electrically conductive frame, comprises an electrically conductive body. The body has a central portion and first and second spaced-apart arms extending from the central portion. Each arm has first and second outer portions with frame surface-disrupting element at the outer portions.

  19. Selenium in Oklahoma ground water and soil

    SciTech Connect (OSTI)

    Atalay, A.; Vir Maggon, D.

    1991-03-30

    Selenium with a consumption of 2 liters per day (5). The objectives of this study are: (1) to determine the concentrations of Se in Oklahoma ground water and soil samples. (2) to map the geographical distribution of Se species in Oklahoma. (3) to relate groundwater depth, pH and geology with concentration of Se.

  20. Ground Vibration Measurements at LHC Point 4

    SciTech Connect (OSTI)

    Bertsche, Kirk; /SLAC; Gaddi, Andrea; /CERN

    2012-09-17

    Ground vibration was measured at Large Hadron Collider (LHC) Point 4 during the winter shutdown in February 2012. This report contains the results, including power and coherence spectra. We plan to collect and analyze vibration data from representative collider halls to inform specifications for future linear colliders, such as ILC and CLIC. We are especially interested in vibration correlations between final focus lens locations.

  1. A new read-out architecture for the ATLAS Tile Calorimeter Phase-II Upgrade

    E-Print Network [OSTI]

    Valero, Alberto; The ATLAS collaboration

    2015-01-01

    TileCal is the Tile hadronic calorimeter of the ATLAS experiment at the LHC. The LHC has planned a series of upgrades culminating in the High Luminosity LHC (HL-LHC) which will increase of order five times the LHC nominal instantaneous luminosity. TileCal will undergo an upgrade to accommodate to the HL-LHC parameters. The TileCal read-out electronics will be redesigned introducing a new read-out strategy. The data generated in the detector will be transferred to the new Read-Out Drivers (sRODs) located in off-detector for every bunch crossing before any event selection is applied. Furthermore, the sROD will be responsible of providing preprocessed trigger information to the ATLAS first level of trigger. It will implement pipeline memories to cope with the latencies and rates specified in the new trigger schema and in overall it will represent the interface between the data acquisition, trigger and control systems and the on-detector electronics. The new TileCal read-out architecture will be presented includi...

  2. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    E-Print Network [OSTI]

    Ntekas, Konstantinos; The ATLAS collaboration

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  3. Janus Upgrade using brewster angle disk amplifier technology. [Janus laser system

    SciTech Connect (OSTI)

    Hunt, J.; Boben, R.; Blocker, R.; Clark, J.; Henesian, M.; Victoria, J.; Mayo, S.; Patton, H.; Pedersen, K.; Strange, N.; Swain, J.

    1990-10-24

    The Nuclear Test and Experimental Science Program (NTES) has requested that the Laser Program design and price an upgrade to the Janus laser system (JANUS UPGRADE) capable of reliably delivering in excess of 200 joules per beamline in a range of pulse forms to three experiment areas. The facility is to have the following characteristics: three experiment areas, two high energy beams, each with 200--400 joule/1 ns at a wavelength of 1.053 or 1.064 microns, and 125--250 J/1 ns when frequency doubled, one probe beam (0.1 J rated at 30 ps) to be used for interferometry, and reliable operation. The proposed facility would occupy approximately 5600 ft{sup 2} and be located in the Bldg. 174 complex. A block diagram of the entire facility is shown in Fig. 1. The facility is further defined by the Work Breakdown Structure (also shown in Fig. 1). The main elements of the WBS are the conventional facility and modifications thereof (WBS 1), special equipment (WBS 2), the laser (WBS 3), the experiment areas (WBS 4), the controls and data acquisition system (WBS 5), and the project integration (WBS 6). The experiment area has three target chambers and uses diagnostic hardware now in Janus. 12 figs., 4 tabs.

  4. Study of the performance of the MicroMegas chambers for the ATLAS Muon Spectrometer Upgrade

    E-Print Network [OSTI]

    Vanadia, Marco; The ATLAS collaboration

    2015-01-01

    Micromegas (MICRO MEsh GAseous Structure) chambers are Micro-Pattern Gaseous Detectors designed to provide a high spatial resolution in highly irradiated environments. In 2007 an ambitious long-term R&D activity was started in the context of the ATLAS experiment, at CERN: the Muon ATLAS Micromegas Activity (MAMMA). After years of tests on prototypes and technology breakthroughs, Micromegas chambers were chosen as tracking detectors for an upgrade of the ATLAS Muon Spectrometer. These novel detectors will be installed in 2018 and 2019 during the second long shutdown of the Large Hadron Collider, and will serve as precision detectors in the innermost part of the ATLAS Muon Spectrometer. Eight layers of Micromegas modules of unprecedented size, up to 3 $\\rm{{m^2}}$, will cover a surface of 150 $\\rm{{m^2}}$ for a total active area of about 1200 $\\rm{{m^2}}$. This upgrade will be crucial to ensure high quality performance for the ATLAS Muon Spectrometer in view of the third run of the Large Hadron Collider and...

  5. Upgrades of the high resolution imaging x-ray crystal spectrometers on experimental advanced superconducting tokamak

    SciTech Connect (OSTI)

    Lu, B.; Wang, F.; Fu, J.; Li, Y.; Wan, B.; Shi, Y.; Bitter, M.; Hill, K. W.; Lee, S. G.

    2012-10-15

    Two imaging x-ray crystal spectrometers, the so-called 'poloidal' and 'tangential' spectrometers, were recently implemented on experimental advanced superconducting tokamak (EAST) to provide spatially and temporally resolved impurity ion temperature (T{sub i}), electron temperature (T{sub e}) and rotation velocity profiles. They are derived from Doppler width of W line for Ti, the intensity ratio of Li-like satellites to W line for Te, and Doppler shift of W line for rotation. Each spectrometer originally consisted of a spherically curved crystal and a two-dimensional multi-wire proportional counter (MWPC) detector. Both spectrometers have now been upgraded. The layout of the tangential spectrometer was modified, since it had to be moved to a different port, and the spectrometer was equipped with two high count rate Pilatus detectors (Model 100 K) to overcome the count rate limitation of the MWPC and to improve its time resolution. The poloidal spectrometer was equipped with two spherically bent crystals to record the spectra of He-like and H-like argon simultaneously and side by side on the original MWPC. These upgrades are described, and new results from the latest EAST experimental campaign are presented.

  6. A transverse bunch by bunch feedback system for Pohang Light Source upgrade

    SciTech Connect (OSTI)

    Lee, E.-H.; Kim, D.-T.; Huang, J.-Y.; Shin, S.; Nakamura, T.; Kobayashi, K.

    2014-12-15

    The Pohang Light Source upgrade (PLS-II) project has successfully upgraded the Pohang Light Source (PLS). The main goals of the PLS-II project are to increase the beam energy to 3 GeV, increase the number of insertion devices by a factor of two (20 IDs), increase the beam current to 400 mA, and at the same time reduce the beam emittance to below 10 nm by using the existing PLS tunnel and injection system. Among 20 insertion devices, 10 narrow gap in-vacuum undulators are in operation now and two more in-vacuum undulators are to be installed later. Since these narrow gap in-vacuum undulators are most likely to produce coupled bunch instability by the resistive wall impedance and limit the stored beam current, a bunch by bunch feedback system is implemented to suppress coupled bunch instability in the PLS-II. This paper describes the scheme and performance of the PLS-II bunch by bunch feedback system.

  7. The New Front-End Electronics for the ATLAS Tile Calorimeter Phase 2 Upgrade

    E-Print Network [OSTI]

    Drake, Gary; The ATLAS collaboration

    2015-01-01

    We present the plans, design, and performance results to date ofor the new front-end electronics being developed for the Phase 2 Upgrade of the ATLAS Tile Calorimeter. The front-end electronics will be replaced to address the increase in beam energy and luminosity planned for the LHC around 2023, as well as to upgrade to faster, more modern components with higher radiation tolerance. The new electronics will operate dead-timelessly, pushing full data sets from each beam crossing to the data acquisition system that resides off-detector in the USA15 counting room. The new electronics contains five main parts: the front-end boards that connect directly to the photo-multiplier tubes; the Main Boards that digitize the data; the Daughter Boards that collect the data streams and contain the high-speed optical communication links for writing data to the data acquisition system; a programmable high voltage control system; and a new low-voltage power supply. There are different options for implementing these subcompone...

  8. Improved Catalysts for Heavy Oil Upgrading Based on Zeolite Y Nanoparticles Encapsulated Stable Nanoporous Host

    SciTech Connect (OSTI)

    Conrad Ingram; Mark Mitchell

    2007-09-30

    The objective of this project is to synthesize nanocrystals of highly acidic zeolite Y nanoclusters, encapsulate them within the channels of mesoporous (nanoporous) silicates or nanoporous organosilicates, and evaluate the 'zeolite Y/Nanoporous host' composites as catalysts for the upgrading of heavy petroleum feedstocks. In comparison to conventionally-used zeolite Y catalysts of micron size particles, the nanocrystals (< 100 nm particle size) which contain shorter path lengths, are expected to allow faster diffusion of large hydrocarbon substrates and the catalysis products within and out of the zeolite's channels and cages (<1 nm size). This is expected to significantly reduce deactivation of the catalyst and to prolong their period of reactivity. Encapsulating zeolite Y nanocrystals within the nanoporous materials is expected to protect its external surfaces and pore entrances from being blocked by large hydrocarbon substrates, since these substrates will initially be converted to small molecules by the nanoporous host (a catalyst in its own right). The project consisted of four major tasks as follows: (1) synthesis of the nanoparticles of zeolite Y (of various chemical compositions) using various techniques such as the addition of organic additives to conventional zeolite Y synthesis mixtures to suppress zeolite Y crystal growth; (2) synthesis of nanoporous silicate host materials of up to 30 nm pore diameter, using poly (alkylene oxide) copolymers which when removed will yield a mesoporous material; (3) synthesis of zeolite Y/Nanoporous Host composite materials as potential catalysts; and (4) evaluation of the catalyst for the upgrading of heavy petroleum feedstocks.

  9. Process and economic model of in-field heavy oil upgrading using aqueous pyrolysis

    SciTech Connect (OSTI)

    Thorsness, C. B., LLNL

    1997-01-21

    A process and economic model for aqueous pyrolysis in-field upgrading of heavy oil has been developed. The model has been constructed using the ASPEN PLUS chemical process simulator. The process features cracking of heavy oil at moderate temperatures in the presence of water to increase oil quality and thus the value of the oil. Calculations with the model indicate that for a 464 Mg/day (3,000 bbl/day) process, which increases the oil API gravity of the processed oil from 13.5{degree} to 22.4{degree}, the required value increase of the oil would need to be at least $2.80/Mg{center_dot}{degree}API($0.40/bbl{center_dot}{degree}API) to make the process economically attractive. This level of upgrading has been demonstrated in preliminary experiments with candidate catalysts. For improved catalysts capable of having the coke make and increasing the pyrolysis rate, a required price increase for the oil as low as $1.34/Mg{center_dot}{degree}API ($0.21/bbl{center_dot}{degree}API)has been calculated.

  10. An evaluation of GPUs for use in an upgraded ATLAS High Level Trigger

    E-Print Network [OSTI]

    Tavares Delgado, Ademar; The ATLAS collaboration; Bold, Tomasz; Augusto, Jose; Kama, Sami; Negrini, Matteo; Sidoti, Antonio; Rinaldi, Lorenzo; Tupputi, Salvatore; Baines, John; Bauce, Matteo; Messina, Andrea; Emeliyanov, Dmitry; Elliott, Aaron Kyle; Greenwood, Zeno Dixon; Laosooksathit, Supada

    2015-01-01

    ATLAS is a general purpose particle physics experiment located on the LHC collider at CERN. The ATLAS Trigger system consists of two levels, the first level (L1) implemented in hardware and the High Level Trigger (HLT) implemented in software running on a farm of commodity CPU. The HLT reduces the trigger rate from the 100 kHz L1 accept rate to 1 kHz for recording requiring an average per-event processing time of ~250 ms for this task. The HLT selection is based on reconstructing tracks in the Inner Detector and Muon Spectrometer and clusters of energy deposited in the Calorimeter. Performing this reconstruction within the available HLT farm resources presents a significant challenge that will increase significantly after future LHC upgrades resulting in higher detector occupancies. General purpose Graphics Processor Units (GPGPU) are being evaluated for possible future inclusion in an upgraded HLT farm. We report on a demonstrator that has been developed consisting of GPGPU implementations of the Calorimeter...

  11. Westinghouse Hanford Company safety analysis reports and technical safety requirements upgrade program

    SciTech Connect (OSTI)

    Busche, D.M.

    1995-09-01

    During Fiscal Year 1992, the US Department of Energy, Richland Operations Office (RL) separately transmitted the following US Department of Energy (DOE) Orders to Westinghouse Hanford Company (WHC) for compliance: DOE 5480.21, ``Unreviewed Safety Questions,`` DOE 5480.22, ``Technical Safety Requirements,`` and DOE 5480.23, ``Nuclear Safety Analysis Reports.`` WHC has proceeded with its impact assessment and implementation process for the Orders. The Orders are closely-related and contain some requirements that are either identical, similar, or logically-related. Consequently, WHC has developed a strategy calling for an integrated implementation of the three Orders. The strategy is comprised of three primary objectives, namely: Obtain DOE approval of a single list of DOE-owned and WHC-managed Nuclear Facilities, Establish and/or upgrade the ``Safety Basis`` for each Nuclear Facility, and Establish a functional Unreviewed Safety Question (USQ) process to govern the management and preservation of the Safety Basis for each Nuclear Facility. WHC has developed policy-revision and facility-specific implementation plans to accomplish near-term tasks associated with the above strategic objectives. This plan, which as originally submitted in August 1993 and approved, provided an interpretation of the new DOE Nuclear Facility definition and an initial list of WHC-managed Nuclear Facilities. For each current existing Nuclear Facility, existing Safety Basis documents are identified and the plan/status is provided for the ISB. Plans for upgrading SARs and developing TSRs will be provided after issuance of the corresponding Rules.

  12. 5 (Upgradable to 25 keV) Free Electron Laser (FEL) Facility

    E-Print Network [OSTI]

    York, R C

    2013-01-01

    A Free Electron Laser (FEL) facility utilizing a recirculated Superconducting Radio Frequency (SRF) linear accelerator (linac) provides the opportunity to achieve about five times greater photon energy than an unrecirculated linac of similar cost. > A 4 GeV SRF, cw, electron linac can be used to drive an FEL producing 5 keV photons. The SLAC National Accelerator Laboratory, a Department of Energy (DOE) Basic Energy Sciences (BES) laboratory, proposes to utilize a 4 GeV unrecirculated, SRF, linac in a segment of existing linac tunnel. > For an initial investment similar to that of the proposed SLAC strategy, a recirculated SRF linac system could deliver the 4 GeV electrons for photon energies of 5 keV and provide an upgrade path to photon energies of 25 keV. > Further support amounting to about a third of the initial investment would provide upgrade funds for additional SRF linac and cryogenic capacity sufficient to provide electron energies appropriate for 25 keV photons matching the European XFEL.

  13. Laboratory measurement of secondary pollutant yields from ozone reaction with HVAC filters.

    E-Print Network [OSTI]

    Destaillats, Hugo

    2012-01-01

    2009 Conference Laboratory Measurement of SecondaryBerkeley National Laboratory is an equal opportunity2009 Conference Laboratory Measurement of Secondary

  14. q TOKAMAK DISCHARGES IN THE TOKAPOLE II UPGRADE (Poster (7W13) presented at the 29th Annual Meeting of the

    E-Print Network [OSTI]

    Sprott, Julien Clinton

    PLP 1018 q TOKAMAK DISCHARGES IN THE TOKAPOLE II UPGRADE (Poster (7W13) presented at the 29th transmitted without consent of the authors and major professor. #12;ABSTRACT (modified) qTokamak.C. Sprott I.H. Tant Univ. of Wisconsin - Madison. An upgrade of the Tokapole II poloidal divertor tokamak

  15. Prompt detonation of secondary explosives by laser

    SciTech Connect (OSTI)

    Paisley, D.L.

    1989-01-01

    Secondary high explosives have been promptly detonated by directing a laser beam of various wavelengths from 266 nanometers to 1.06 micron on the surface of the explosives. For this paper ''prompt'' means the excess transit time through an explosive charge is /approximately/250 nanoseconds (or less) less than the accepted full detonation velocity time. Timing between laser pulse, explosive initiation and detonation velocity and function time have been recorded. The laser parameters studied include: wavelength, pulse length, energy and power density, and beam diameter (spot size). Explosives evaluated include: PETN, HNS, HMX, and graphited PETN, HNS, and HMX. Explosive parameters that have been correlated with optical parameters include: density, surface area, critical diameter (spot size), spectral characteristics and enhance absorption. Some explosives have been promptly detonated over the entire range of wavelengths, possibly by two competing initiating mechanisms. Other explosives could not be detonated at any of the wavelengths or power densities tested. 8 refs., 12 figs., 1 tab.

  16. Secondary air injection system and method

    DOE Patents [OSTI]

    Wu, Ko-Jen; Walter, Darrell J.

    2014-08-19

    According to one embodiment of the invention, a secondary air injection system includes a first conduit in fluid communication with at least one first exhaust passage of the internal combustion engine and a second conduit in fluid communication with at least one second exhaust passage of the internal combustion engine, wherein the at least one first and second exhaust passages are in fluid communication with a turbocharger. The system also includes an air supply in fluid communication with the first and second conduits and a flow control device that controls fluid communication between the air supply and the first conduit and the second conduit and thereby controls fluid communication to the first and second exhaust passages of the internal combustion engine.

  17. In situ secondary ion mass spectrometry analysis

    SciTech Connect (OSTI)

    Groenewold, G.S.; Applehans, A.D.; Ingram, J.C.; Delmore, J.E.; Dahl, D.A.

    1993-01-01

    The direct detection of tributyl phosphate (TBP) on rocks using molecular beam surface analysis [MBSA or in situ secondary ion mass spectrometry (SIMS)] is demonstrated. Quantities as low as 250 ng were detected on basalt and sandstone with little or no sample preparation. Detection of TBP on soil has proven to be more problematic and requires further study. Ethylenediaminetetraacetic acid (EDTA) is more difficult to detect because it is very reactive with surfaces of interest. Nevertheless, it is possible to detect EDTA if the acidity of the surface is controlled. The detection of EDTA-metal complexes is currently an open question, but evidence is presented for the detection of ions arising from a EDTA-lead complex. Carboxylic acids (i.e., citric, ascorbic, malic, succinic, malonic, and oxalic) give characteristic SIM spectra, but their detection on sample surfaces awaits evaluation.

  18. Ni/metal hydride secondary element

    DOE Patents [OSTI]

    Bauerlein, Peter

    2005-04-19

    A Ni/metal hydride secondary element having a positive nickel hydroxide electrode, a negative electrode having a hydrogen storage alloy, and an alkaline electrolyte, the positive electrode, provided with a three-dimensional metallic conductive structure, also contains an aluminum compound which is soluble in the electrolyte, in addition to nickel hydroxide and cobalt oxide. The aluminum compound is aluminum hydroxide and/or aluminum oxide, and the mass of the aluminum compound which is present in the positive bulk material mixture is 0.1 to 2% by weight relative to the mass of the nickel hydroxide which is present. In combination with aluminum hydroxide or aluminum oxide, the positive electrode further contains lanthanoid oxidic compounds Y.sub.2 O.sub.3, La.sub.2 O.sub.3 and Ca(OH).sub.2, as well as mixtures of these compounds.

  19. Combustion and inorganic emissions of ground waste tires

    SciTech Connect (OSTI)

    Levendis, Y.A.; Atal, A.; Steciak, J.

    1995-12-31

    An experimental study was undertaken to assess the combustion characteristics and emissions of SO{sub 2}, NO{sub x} and CO{sub 2} gases from ground waste tires. Results were contrasted with those obtained from burning pulverized coal. Laboratory bench-scale experiments were conducted in a drop-tube, laminar-flow furnace, in air at fuel-lean conditions, at gas temperatures ranging from 1300 K to 1600 K. Two particle size cuts were burned from both materials, 75-90 {mu}m and 180-212 {mu}m. Blends of coal and tire particles, at equal weight ratios, were also burned. Pyrometric and cinematographic observations revealed that the coal particles exhibited distinct volatile and char combustion phases, while tire particles exhibited a distinct primary volatile phase followed by a char combustion phase, which was accompanied by burning of secondary pyrolysis products. SO{sub 2} emissions of burning ground tires increased from 160 to 500 ppm as the temperature increased from 1300 K to 1600 K. Combustion of coal produced SO{sub 2} emissions in the neighborhood of 200-300 ppm (corresponding to 40 to 60 wt% of its sulfur content) independent of the gas temperature. The blend of coal and tire particles (equal mass ratios) exhibited SO{sub 2} values which fell in between the above. NO{sub x} emissions were constant at approximately 175 ppm for tire crumb (corresponding to approximately 45 wt% of its fuel nitrogen content) and 625 ppm for coal (corresponding to 55 wt% of its fuel nitrogen content) in the temperature range studied. CO{sub 2} emissions from tire were 8-9 molar %, while for coal particles they were 5-7 molar %; the upper limits corresponded to approximately 100% combustion efficiency. As a means to reduce the SO{sub 2} emissions, pulverized coal and tire crumb were fluidized together with particles of a calcium bearing sorbent - calcium magnesium acetate (CMA). CMA has been identified as an effective SO{sub 2} scrubbing agent in previous studies.

  20. Coupled reservoir-geomechanical analysis of CO2 injection and ground deformations at In Salah, Algeria

    E-Print Network [OSTI]

    Rutqvist, J.

    2010-01-01

    CO 2 sequestration; In Salah; geomechanics; ground surfaceCO 2 injection, geomechanics, and ground surface

  1. "A New Paradigm for Secondary Eyewall Formation in Tropical Cyclones...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Road Princeton, NJ 08540-6649 "A New Paradigm for Secondary Eyewall Formation in Tropical Cyclones", Chun-Chieh Wu (National Taiwan University) Contact Information Website: Website...

  2. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual.

  3. Thermal ground state and nonthermal probes

    E-Print Network [OSTI]

    Grandou, Thierry

    2015-01-01

    The Euclidean formulation of SU(2) Yang-Mills thermodynamics admits periodic, (anti)selfdual solutions to the fundamental, classical equation of motion which possess one unit of topological charge: (anti)calorons. A spatial coarse graining over the central region in a pair of such localised field configurations with trivial holonomy generates an inert adjoint scalar field $\\phi$, effectively describing the pure quantum part of the thermal ground state in the induced quantum field theory. The latter's local vertices are mediated by just-not-resolved (anti)caloron centers of action $\\hbar$. This is the basic reason for a rapid convergence of the loop expansion of thermodynamical quantities, polarization tensors, etc., their effective loop momenta being severely constrained in entirely fixed and physical unitary-Coulomb gauge. Here we show for the limit of zero holonomy how (anti)calorons associate a temperature independent electric permittivity and magnetic permeability to the thermal ground state of SU(2)$_{\\t...

  4. Thermal ground state and nonthermal probes

    E-Print Network [OSTI]

    Thierry Grandou; Ralf Hofmann

    2015-08-24

    The Euclidean formulation of SU(2) Yang-Mills thermodynamics admits periodic, (anti)selfdual solutions to the fundamental, classical equation of motion which possess one unit of topological charge: (anti)calorons. A spatial coarse graining over the central region in a pair of such localised field configurations with trivial holonomy generates an inert adjoint scalar field $\\phi$, effectively describing the pure quantum part of the thermal ground state in the induced quantum field theory. Here we show for the limit of zero holonomy how (anti)calorons associate a temperature independent electric permittivity and magnetic permeability to the thermal ground state of SU(2)$_{\\tiny\\mbox{CMB}}$, the Yang-Mills theory conjectured to underlie photon propagation.

  5. SRS Burial Ground Complex: Remediation in Progress

    SciTech Connect (OSTI)

    Griffin, M.; Crapse, B.; Cowan, S.

    1998-01-21

    Closure of the various areas in the Burial Ground Complex (BGC) represents a major step in the reduction of risk at the Savannah River Site (SRS) and a significant investment of resources. The Burial Ground Complex occupies approximately 195 acres in the central section of the SRS. Approximately 160 acres of the BGC consists of hazardous and radioactive waste disposal sites that require remediation. Of these source acres, one-third have been remediated while two-thirds are undergoing interim or final action. These restoration activities have been carried out in a safe and cost effective manner while minimizing impact to operating facilities. Successful completion of these activities is in large part due to the teamwork demonstrated by the Department of Energy, contractor/subcontractor personnel, and the regulatory agencies. The experience and knowledge gained from the closure of these large disposal facilities can be used to expedite closure of similar facilities.

  6. Grounding and shielding in the accelerator environment

    SciTech Connect (OSTI)

    Kerns, Q.

    1991-12-31

    Everyday features of the accelerator environment include long cable runs, high power and low level equipment sharing building space, stray electromagnetic fields and ground voltage differences between the sending and receiving ends of an installation. This paper pictures some Fermilab installations chosen to highlight significant features and presents practices, test methods and equipment that have been helpful in achieving successful shielding. Throughout the report are numbered statements aimed at summarizing good practices and avoiding pitfalls.

  7. Compression of ground-motion data

    SciTech Connect (OSTI)

    Long, J.W.

    1981-04-01

    Ground motion data has been recorded for many years at Nevada Test Site and is now stored on thousands of digital tapes. The recording format is very inefficient in terms of space on tape. This report outlines a method to compress the data onto a few hundred tapes while maintaining the accuracy of the recording and allowing restoration of any file to the original format for future use. For future digitizing a more efficient format is described and suggested.

  8. Grounding and shielding in the accelerator environment

    SciTech Connect (OSTI)

    Kerns, Q.

    1991-01-01

    Everyday features of the accelerator environment include long cable runs, high power and low level equipment sharing building space, stray electromagnetic fields and ground voltage differences between the sending and receiving ends of an installation. This paper pictures some Fermilab installations chosen to highlight significant features and presents practices, test methods and equipment that have been helpful in achieving successful shielding. Throughout the report are numbered statements aimed at summarizing good practices and avoiding pitfalls.

  9. Mechanical interface having multiple grounded actuators

    DOE Patents [OSTI]

    Martin, Kenneth M. (Palo Alto, CA); Levin, Mike D. (Sunnyvale, CA); Rosenberg, Louis B. (Pleasanton, CA)

    1998-01-01

    An apparatus and method for interfacing the motion of a user-manipulable object with a computer system includes a user object physically contacted or grasped by a user. A 3-D spatial mechanism is coupled to the user object, such as a stylus or a medical instrument, and provides three degrees of freedom to the user object. Three grounded actuators provide forces in the three degrees of freedom. Two of the degrees of freedom are a planar workspace provided by a closed-loop linkage of members, and the third degree of freedom is rotation of the planar workspace provided by a rotatable carriage. Capstan drive mechanisms transmit forces between actuators and the user object and include drums coupled to the carriage, pulleys coupled to grounded actuators, and flexible cables transmitting force between the pulleys and the drums. The flexibility of the cable allows the drums to rotate with the carriage while the pulleys and actuators remain fixed to ground. The interface also may include a floating gimbal mechanism coupling the linkage to the user object. The floating gimbal mechanism includes rotatably coupled gimbal members that provide three degrees of freedom to the user object and capstan mechanisms coupled between sensors and the gimbal members for providing enhanced sensor resolution.

  10. Experimental Study of In-Situ Upgrading for Heavy Oil Using Hydrogen Donors and Catalyst under Steam Injection Condition 

    E-Print Network [OSTI]

    Zhang, Zhiyong

    2012-07-16

    This research is a study of the in-situ upgrading of Jobo crude oil using steam, tetralin or decalin, and catalyst (Fe(acac)?) at temperatures of 250 °C, 275 °C and 300 °C for 24 hours, 48 hours and 72 hours using an autoclave. Viscosity, API...

  11. CARE-HHH-APD Workshop on Interaction Regions for the LHC Upgrade, DAFNE, and SuperB

    E-Print Network [OSTI]

    Zimmermann, Frank; IR'07; IR 2007

    2008-01-01

    This report contains the Proceedings of the CARE-HHH-APD Mini-Workshop “IR’07,” which was held in Frascati, Italy, from 7 to 9 November 2007. The central theme of the IR’07 Mini-Workshop was the upgrade of the LHC interaction region (IR). A second topic was the experience with the upgraded DAFNE IR as well as the ongoing plans and studies for SuperB, plus possible applications of crab-waist collisions for the LHC upgrade. Discussions during the workshop addressed the performance and limitations of the IR-upgrade optics performance, the optimization of new LHC triplet magnets, the US-LARP magnet strategy (response to Lucio Rossi’s “challenge”), heat deposition, earlyseparation dipoles, detector-integrated quadrupoles, strategy for crab cavities, beam–beam wire compensators, and crab-waist collisions. At IR’07 all auxiliary systems, e.g. wires and crab cavities, received a strong boost. Energy deposition was shown to add an important criterion to the optics requirements—in a first attempt a ...

  12. TCS Upgrade K.E. Miller, J.A. Grossnickle, T.E. DeHart, W.S. Kimball

    E-Print Network [OSTI]

    Washington at Seattle, University of

    and frequency determines the plasma density, as the temperature is limited, so is the FRC's external field's (400eV, 1021m-3, 5kG) · Produce initial plasma for RMF formed FRC's TCS RMF Interaction ChamberTCS Upgrade K.E. Miller, J.A. Grossnickle, T.E. DeHart, W.S. Kimball Redmond Plasma Physics

  13. Upgrade of the MIT Linear Electrostatic Ion Accelerator (LEIA) for nuclear diagnostics development for Omega, Z and the NIF

    E-Print Network [OSTI]

    diagnostics. In addition, in situ measurements of the on-target beam profile, made with a CCD camera, are usedUpgrade of the MIT Linear Electrostatic Ion Accelerator (LEIA) for nuclear diagnostics development accelerators Phys. Plasmas 19, 023107 (2012) Microgan electron cyclotron resonance ion source in a Van de

  14. Engineering for Sustainability http://engineering.tufts.edu/ Nanoscale Gold Catalysts for the Upgrade of Hydrogen used in Fuel Cells

    E-Print Network [OSTI]

    Tufts University

    for the Upgrade of Hydrogen used in Fuel Cells What is the problem? Fuel processing by steam reforming or partial to protect the Pt- based electrocatalyst on the fuel cell anode. New catalysts must be developed by the current generation fuel cells and their operating conditions. Why is it an important problem? The platinum

  15. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    SciTech Connect (OSTI)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-09-28

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

  16. Ion source development for the proposed FNAL 750keV injector upgrade

    SciTech Connect (OSTI)

    Bollinger, D.S.; /Fermilab

    2010-11-01

    Currently there is a Proposed FNAL 750keV Injector Upgrade for the replacement of the 40 year old Fermi National Laboratory (FNAL) Cockcroft-Walton accelerators with a new ion source and 200MHz Radio Frequency Quadruple (RFQ). The slit type magnetron being used now will be replaced with a round aperture magnetron similar to the one used at Brookhaven National Lab (BNL). Operational experience from BNL has shown that this type of source is more reliable with a longer lifetime due to better power efficiency. The current source development effort is to produce a reliable source with >60mA of H- beam current, 15Hz rep-rate, 100s pulse width, and a duty factor of 0.15%. The source will be based on the BNL design along with development done at FNAL for the High Intensity Neutrino Source (HINS).

  17. Upgrade of the ATLAS Control and Configuration Software for Run 2

    E-Print Network [OSTI]

    Avolio, Giuseppe; The ATLAS collaboration; Anders, Gabriel; Caprini, Mihai; Corso-Radu, Alina; D'ascanio, Matteo; De Castro Vargas Fernandes, Julio; Dova, Maria-Teresa; Kazarov, Andrei; Klopov, Nikolai; Kolobara, Bernard; Kotov, Vladislav; Lankford, Andrew; Laurent, Florian; Lehmann Miotto, Giovanna; Magnoni, Luca; Olechko, Serguei; Papaevgeniou, Lykourgos; Ryabov, Yury; Santos, Alejandro; Scannicchio, Diana; Seixas, Jose; Soloviev, Igor; Unel, Gokhan; Yasu, Yoshiji

    2015-01-01

    The ATLAS data acquisition (DAQ) system is controlled and configured via a software infrastructure that takes care of coherently orchestrating the data taking. While the overall architecture, established at the end of the 90’s, has proven to be solid and flexible, many software components have undergone a complete redesign or re-implementation in 2013/2014 in order to fold-in the additional requirements that appeared in the course of LHC’s Run 1, to profit from new technologies and to re-factorise and cleanup software. This paper describes the approach that was taken to plan, organise and carry out this software upgrade project. It highlights the main technical choices that have guided the overall work, describes the major achievements and outlines how the control and configuration software may be further improved or re-shaped in the future.

  18. Flat bunch creation and acceleration: a possible path for the LHC luminosity upgrade

    SciTech Connect (OSTI)

    Bhat, C.M.; /Fermilab

    2009-05-01

    Increasing the collider luminosity by replacing bunches having Gaussian line-charge distribution with flat bunches, but with same beam-beam tune shift at collision, has been studied widely in recent years. But, creation of 'stable' flat bunches (and their acceleration) using a multiple harmonic RF system has not been fully explored. Here, we review our experience with long flat bunches in the barrier RF buckets at Fermilab.We presentsome preliminary results from beam dynamics simulations and recent beam studies in the LHC injectors to create stable flat bunches using double harmonic RF systems. The results deduced from these studies will be used to model the necessary scheme for luminosity upgrade in the LHC. We have also described a viable (and economical) way for creation and acceleration of flat bunches in the LHC. The flat bunch scheme may have many advantages over the LHC baseline scenario, particularly because of the reduced momentum spread of the bunch for increased intensities.

  19. Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

    SciTech Connect (OSTI)

    A. Burrill, G.K. Davis, F. Marhauser, C.E. Reece, A.V. Reilly, M. Stirbet

    2011-09-01

    The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

  20. OVERVIEW OF A RECONFIGURABLE SIMULATOR FOR MAIN CONTROL ROOM UPGRADES IN NUCLEAR POWER PLANTS

    SciTech Connect (OSTI)

    Ronald L. Boring

    2012-10-01

    This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plant modernization in the U.S. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.