Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EA-1155: Ground-water Compliance Activities at the Uranium Mill Tailings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Ground-water Compliance Activities at the Uranium Mill 5: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook, Wyoming EA-1155: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook, Wyoming SUMMARY This EA evaluates the environmental impacts for the proposal to comply with the Environmental Protection Agency's ground-water standards set forth in 40 CFR 192 at the Spook, Wyoming Uranium Mill Tailings Site by using the selected alternative stated in the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 1, 1997 EA-1155: Final Environmental Assessment Ground-water Compliance Activities at the Uranium Mill Tailings Site,

2

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

58 58 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites Final February 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick Rock Sites February 2003 Final Page iii Contents Page Acronyms and Abbreviations...........................................................................................................v Executive Summary...................................................................................................................... vii 1.0 Introduction.............................................................................................................................1

3

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

4

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Impact Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites AGENCY: U.S. DEP.4RTMENT OF ENERGY ACTIOK: FL&-DING OF NO SIGNIFICANT IMP-ACT (FONSI) SU$IM$RY: The U.S. Department of Energy (DOE) plans to implement ground lvater compliance strategies for two Uranium Mill Tailings Remedial Action (UMTR.4) Project sites near Slick Rock. Colorado. The purpose of the strategies is to comply with U.S. En\.ironmental Protection .Qency (EP.Aj ground n'ater standards defined in Title 40 Codr ~fF~d~w/ iieplutio?r.s (CFR) Part 192. and in so doing. protect human health and the en\.ironment. Ground water at the Slick Rock sites is contaminated with residual radioactive materials from hisTorica acti\,ities, associated with the processin of uranium ore, The planned action (~formeri>,.

5

DOE/EA-1388: Environmental Assessment of Ground Water Compliance at the Shiprock Uranium Mill Tailings Site (September 2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

388 388 Environmental Assessment of Ground Water Compliance at the Shiprock Uranium Mill Tailings Site Final September 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 This Page Intentionally Blank DOE Grand Junction Office EA of Ground Water Compliance at the Shiprock Site September 2001 Final Page iii Contents Page Acronyms and Abbreviations ........................................................................................................ vii Executive Summary ....................................................................................................................... ix 1.0 Introduction .............................................................................................................................1

6

Revised ground-water monitoring compliance plan for the 300 area process trenches  

SciTech Connect

This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

1988-09-01T23:59:59.000Z

7

Ground-water monitoring compliance plan for the Hanford Site Solid Waste Landfill  

SciTech Connect

Washington state regulations required that solid waste landfill facilities have ground-water monitoring programs in place by May 27, 1987. This document describes the well locations, installation, characterization studies and sampling and analysis plan to be followed in implementing the ground-water monitoring program at the Hanford Site Solid Waste Landfill (SWL). It is based on Washington Administrative Code WAC 173-304-490. 11 refs., 19 figs., 4 tabs.

Fruland, R.M.

1986-10-01T23:59:59.000Z

8

EA-1406: Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site, Rifle, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposed compliance strategy of natural flushing combined with institutional controls and continued monitoring for the New Rifle uranium mill...

9

Ground Water Ground Sky Sky Water Vegetation Ground Vegetation Water  

E-Print Network (OSTI)

Bear Snow Vegetation RhinoWater Vegetation Ground Water Ground Sky Sky Rhino Water Vegetation Ground Vegetation Water Rhino Water Vegetation Ground Rhino Water Rhino Water Ground Ground Vegetation Water Rhino Vegetation Rhino Vegetation Ground Rhino Vegetation Ground Sky Rhino Vegetation Ground Sky

Chen, Tsuhan

10

DOE/EA-1313: Environmental Assessment of Ground Water Compliance at the Monument Valley, Arizona, Uranium Mill Tailings Site (03/22/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1313 DOE/EA-1313 Rev. 0 Environmental Assessment of Ground Water Compliance at the Monument Valley, Arizona, Uranium Mill Tailings Site Final March 2005 Prepared by U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Document Number U0069700 This Page Intentionally Blank DOE Office of Legacy Management EA of Ground Water Compliance at the Monument Valley Site March 2005 Final Page iii Contents Page Acronyms and Abbreviations ....................................................................................................... vii Executive Summary.......................................................................................................................

11

DOE/EA-1312: Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (September 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Rev. 0 Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) Final September 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy EA of Ground Water Compliance at the Grand Junction UMTRA Project Site DOE Grand Junction Office Page ii Final September 1999 Contents Executive Summary.........................................................................................................................v 1.0 Introduction...............................................................................................................................1 1.1 Grand Junction UMTRA Project Site Location and Description.........................................1

12

Assessment of compliance with ground water protection standards in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the assessment of compliance with ground water protection standards in the 2008 YM PA. The following topics are addressed: (i) regulatory background, (ii) analysis structure including characterization of uncertainty, and (iii) analysis results for each of the ground water protection standards. The present article is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional articles in the issue describe other aspects of the 2008 YM PA.

C.W. Hansen; G.A. Behie; K.M. Brooks; Y. Chen; J.C. Helton; S.P. Hommel; K.P. Lee; B. Lester; P.D. Mattie; S. Mehta; S.P. Miller; C.J. Sallaberry; S.D. Sevougian; M. Wasiolek

2014-01-01T23:59:59.000Z

13

Ground water and energy  

SciTech Connect

This national workshop on ground water and energy was conceived by the US Department of Energy's Office of Environmental Assessments. Generally, OEA needed to know what data are available on ground water, what information is still needed, and how DOE can best utilize what has already been learned. The workshop focussed on three areas: (1) ground water supply; (2) conflicts and barriers to ground water use; and (3) alternatives or solutions to the various issues relating to ground water. (ACR)

Not Available

1980-11-01T23:59:59.000Z

14

Ground Water Recovery and Treatment  

Science Journals Connector (OSTI)

Until the environmental revolution, the only ground water that was routinely treated to remove contamination was the impacted ground water that was extracted for beneficial use. With ... the recognition that cont...

Tie Li Ph.D.; Raaj U. Patel P.G.; David K. Ramsden Ph.D.…

2003-01-01T23:59:59.000Z

15

UMTRA Ground Water Project  

Office of Legacy Management (LM)

and viability of the compliance strategy. The current version of the GCAP is in review with NRC. Ongoing monitoring requirements will be evaluated and modified as...

16

Ground water provides drinking water, irrigation for  

E-Print Network (OSTI)

Ground water provides drinking water, irrigation for crops and water for indus- tries. It is also connected to surface waters, and maintains the flow of rivers and streams and the level of wetlands- tion of those along Lake Michigan, most communi- ties, farms and industries still rely on ground water

Saldin, Dilano

17

EPA Final Ground Water Rule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Nuclear Safety and Environment Office of Nuclear Safety and Environment Nuclear Safety and Environment Information Brief HS-20-IB-2007-02 (March 2007) EPA Final Ground Water Rule Safe Drinking Water Act: National Primary Drinking Water Regulations Ground Water Rule - 40 CFR Parts 9, 141 and 142 Final Rule: 71 FR 65574 Effective Date: January 8, 2007 1 RULE SYNOPSIS On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in public water systems (PWSs) that use ground water sources for their supply (these systems are known as ground water systems). This Rule establishes a risk-targeted approach

18

Ground Water Management Regulations (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The rules and regulations apply to the management of the state's ground water resources. In addition, the Commissioner of Conservation has recommended that oil and gas operators with an interest...

19

Questa Baseline and Pre-Mining Ground-Water Quality Investigation. 3. Historical Ground-Water  

E-Print Network (OSTI)

............................................................................................................................................................... 9 Mine history and ground-water development ....................................................................................................................................................... 11 Ground-water quality database.......................................................................................................................................................... 29 Compilation of complete database

20

Hanford Site ground-water monitoring for 1994  

SciTech Connect

This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1994 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiologic and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1994 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1993 and June 1994. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal.

Dresel, P.E.; Thorne, P.D.; Luttrell, S.P. [and others

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Worldwide Occurrences of Arsenic in Ground Water  

Science Journals Connector (OSTI)

...decision-making process of water managers, remediation specialists, and...The geologic and ground-water conditions that promote...water managers, remediation specialists, and...The geologic and ground-water conditions that promote...

D. Kirk Nordstrom

2002-06-21T23:59:59.000Z

22

Surfactants for ground water remediation  

Science Journals Connector (OSTI)

Ground water contamination is a most intractable form of pollution. Spilled solvent or fuel liquids are trapped below the water table by colloidal forces. Surfactants may be used to dramatically improve contaminated aquifer remediation rates. Principal remediation mechanisms include micellar solubilization and mobilization of the trapped liquids by lowering of the oil/water interfacial tension. Surfactant selection is a key to the successful design of a remediation effort, and involves consideration of factors including Krafft Point, surfactant adsorption onto the aquifer solids, and the phase behavior of the oil/water/surfactant system. Successful field demonstrations have occurred in recent months and the technology is moving rapidly toward commercialization. Critical research issues remain including acceptable clean-up levels, surfactant/contaminant in situ biodegradation rates, and surfactant decontamination and reuse.

Jeffrey H. Harwell; David A. Sabatini; R.C. Knox

1999-01-01T23:59:59.000Z

23

Hanford Site ground-water monitoring for 1993  

SciTech Connect

This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices.

Dresel, P.E.; Luttrell, S.P.; Evans, J.C. [and others

1994-09-01T23:59:59.000Z

24

Ground water contamination in the United States  

Science Journals Connector (OSTI)

...volume of ground water in storage exceeds the vol-ume...geo-thermal water; intruded seawater; water affected by evapotranspiration...pressure and the volume in storage may fluctuate according...Estimates of ground water in storage in the United States...communities have over-pumped their freshwater aquifers...

VI Pye; R Patrick

1983-08-19T23:59:59.000Z

25

Montana Ground Water Assessment Act (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This statute establishes a program to systematically assess and monitor the state's ground water and to disseminate the information to interested persons in order to improve the quality of ground...

26

Programmatic Environmental Impact Statement for Ground Water...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for Ground Water Volumes I & II (October 1996) Optical character recognition has been applied to these files, but full search capabilities...

27

Integrated Water Management Options in the Nebraska Ground Water Management &  

E-Print Network (OSTI)

Integrated Water Management Options in the Nebraska Ground Water Management & Protection Act by J of the Nebraska Ground Water Management & Protection Act (GMPA) 2. the special GMPA integrated water management a correlative rights framework, and 5. what additional water management tools are needed to effectively deal

Nebraska-Lincoln, University of

28

Integration of RCRA corrective action with Clean Water Act compliance  

SciTech Connect

A synthetic fibers manufacturing facility is implementing an integrated phased program to upgrade its existing wastewater treatment plant (WWTP) to comply with both the Clean Water Act and the Resource Conservation and Recovery Act (RCRA). The existing WWTP consists of an influent settling basin, two equalization basins, two aeration basins with low- and high-speed aerators, three secondary clarifiers, post-aeration, and belt filter press dewatering with on-site landfilling. The existing WWTP will be replaced with a tank-based system that will include equalization, biological treatment, clarification, effluent filtration, and effluent diffusion. RCRA regulatory compliance incorporated the Corrective Action Program, the Toxicity Characteristic Rule, the Land Disposal Restrictions, and closure/postclosure requirements. Clean Water Act compliance incorporated the Organic Chemicals, Plastics, and Synthetic Fibers (OCPSF) effluent guidelines, effluent toxicity and general water quality requirements. Logistically, project implementation involved fast-track design and construction, close regulatory interface, and maintenance of production process continuity.

Cable, J.K.; Starlin, L.A.; Giltner, J.A.: Futch, R.S.; Ballard, R.W. (CH2M Hill, Atlanta, GA (United States))

1992-05-01T23:59:59.000Z

29

Appendix B Ground Water Management Policy  

Office of Legacy Management (LM)

Ground Water Management Policy Ground Water Management Policy for the Monticello Mill Tailings Site and Adjacent Areas This page intentionally left blank Docun~ent Number Q0029500 Appendix B State of Utah DEPARTblENT OF NATURAL RESOURCES DIVISION OF WATER RIGHTS Ground-Water Management Policy for the Mot~ticello Mill Tailings Site and Adjacent Areas The Monticello Mill Tailings Site is on the southeast portion of the tovm of Monticello in Sectton 36, T33S, K23E and Section 31, i33S. R24E, SLB&M. The mill site was used from 1942 to 1960 in the processing of uranium and vanadium. The U.S. Department of Energy (DOE) is currently cleaning up the site. The site is in the small canyon that forms the drainage for South Creek. The general direction of water flow, of both surface streams and the shallow

30

EPA - Ground Water Discharges (EPA's Underground Injection Control...  

Open Energy Info (EERE)

EPA - Ground Water Discharges (EPA's Underground Injection Control Program) webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Ground Water...

31

Appendix D Surface Water and Ground Water Time-Concentration Plots,  

Office of Legacy Management (LM)

Surface Water and Ground Water Time-Concentration Plots, Surface Water and Ground Water Time-Concentration Plots, Stream Discharge Measurements, Ground Water Level Data, and Ground Water Well Hydrographs This page intentionally left blank Contents Section .................................................................................. Surface Water Time-Concentration Plots D1.O ............................................................................................... Stream Discharge Measurements D2.0 ............................................................. Ground Water Time-Concentration Plots for Uranium D3.0 .......................................................................................................... Ground Water Level Data D4.0 ..............................................................................................

32

Ground-water sample collection and analysis plan for the ground-water surveillance project  

SciTech Connect

The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy`s (DOE`s) Hanford Site in support of DOE`s environmental surveillance responsibilities. The purpose of this document is to translate DOE`s General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives.

Bryce, R.W.; Evans, J.C.; Olsen, K.B.

1991-12-01T23:59:59.000Z

33

Ground-water sample collection and analysis plan for the ground-water surveillance project  

SciTech Connect

The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives.

Bryce, R.W.; Evans, J.C.; Olsen, K.B.

1991-12-01T23:59:59.000Z

34

Water Rights: Ground Water (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water (Indiana) Ground Water (Indiana) Water Rights: Ground Water (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Indiana Program Type Environmental Regulations Provider Indiana Department of Natural Resources It is the policy of the state to provide for the conservation of groundwater resources and limit groundwater waste. The Indiana Department of Natural Resources may designate restricted use areas and limit groundwater withdrawals by existing users in those areas, thus making groundwater use greater than 100,000 gallons per day subject to permitting

35

Water Quality Surface and Ground | Open Energy Information  

Open Energy Info (EERE)

Ground Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWaterQualitySurfaceandGround&oldid612197" Category: NEPA Resources...

36

Interim site characterization report and ground-water monitoring program for the Hanford site solid waste landfill  

SciTech Connect

Federal and state regulations governing the operation of landfills require utilization of ground-water monitoring systems to determine whether or not landfill operations impact ground water at the point of compliance (ground water beneath the perimeter of the facility). A detection-level ground-water monitoring system was designed, installed, and initiated at the Hanford Site Solid Waste Landfill (SWL). Chlorinated hydrocarbons were detected at the beginning of the ground-water monitoring program and continue to be detected more than 1 year later. The most probable source of the chlorinated hydrocarbons is washwater discharged to the SWL between 1985 and 1987. This is an interim report and includes data from the characterization work that was performed during well installation in 1987, such as field observations, sediment studies, and geophysical logging results, and data from analyses of ground-water samples collected in 1987 and 1988, such as field parameter measurements and chemical analyses. 38 refs., 27 figs., 8 tabs.

Fruland, R.M.; Hagan, R.A.; Cline, C.S.; Bates, D.J.; Evans, J.C.; Aaberg, R.L.

1989-07-01T23:59:59.000Z

37

Limiting factors in ground water remediation  

Science Journals Connector (OSTI)

If one is charged with restoring a contaminated aquifer today, the procedure of pumping contaminated water to the surface for treatment and discharge is most often the state-of-practice technology. The perceived success of pump-and-treat technology can be misleading if the hydrology and contaminant characteristics at the site are not adequately understood. A failure to understand the processes controlling contaminant transport can result in extremely long pumping periods and, consequently, costly and inefficient remediation. Effects of tailing, sorption, and residual immiscible fluids on time required for pump-and-treat remediation of ground water are discussed.

Clinton W. Hall; Jeffrey A. Johnson

1992-01-01T23:59:59.000Z

38

120 Ground Water Monitoring & Remediation 32, no. 1/ Winter 2012/pages 120130 NGWA.org Ground Water Monitoring & Remediation  

E-Print Network (OSTI)

120 Ground Water Monitoring & Remediation 32, no. 1/ Winter 2012/pages 120­130 NGWA.org Ground Water Monitoring & Remediation © 2011, National Ground Water Association. Published 2011. This article known as emerging contaminants (ECs) to surrounding groundwater and surface water. ECs consist

39

Analysis of Contaminant Rebound in Ground Water in Extraction...  

Office of Environmental Management (EM)

Analysis of Contaminant Rebound in Ground Water in Extraction Wells at the Tuba City, Arizona, Site Analysis of Contaminant Rebound in Ground Water in Extraction Wells at the Tuba...

40

Diffusion Multilayer Sampling of Ground Water in Five Wells at...  

Office of Environmental Management (EM)

Diffusion Multilayer Sampling of Ground Water in Five Wells at the Tuba City, Arizona, Site Diffusion Multilayer Sampling of Ground Water in Five Wells at the Tuba City, Arizona,...

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan  

Office of Legacy Management (LM)

GWMON 1.12-1 GWMON 1.12-1 U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan for the Land Farm Pilot Test Monument Valley, Arizona August 2000 Prepared by U.S. Department of Energy Grand Junction Ofice Grand Junction, Colorado Project Number UGW-5 1 1-001 5-21-000 Document Number U0106701 This page intentionally left blank Document Number U0106701 Contents Contents 1.0 Introduction ....................................................................................................................... 1 2.0 Purpose and Scope ........................................................................................................... 1 3.0 Pilot-Test Extraction Wellfield 2 4.0 Water Elevation Measurements and Monitoring ............... 4

42

Appendix E Supporting Information for Ground Water Modeling  

Office of Legacy Management (LM)

Supporting Information for Ground Water Modeling Supporting Information for Ground Water Modeling This page intentionally left blank Contents Section Geologic Map of Site Area ........................................................................................................ E1.O Stream Flow Measurements ...................................................................................................... E2.0 Estimates of Ground Water Flow .............................................................................................. E3.0 .......................................... MODFLOW Flow Budget Analysis for OU 1 1 1 Model Subregions E4.0 ............................................................................ Burro Canyon Aquifer Ground Water Model E5.0 This page intentionally left blank

43

Ground Water Management Act (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water Management Act (Virginia) Ground Water Management Act (Virginia) Ground Water Management Act (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Virginia Program Type Environmental Regulations Siting and Permitting Provider Virginia Department of Environmental Quality Under the Ground Water Management Act of 1992, Virginia manages ground water through a program regulating the withdrawals in certain areas called

44

Hanford Site environmental data for calendar year 1990 -- Ground water  

SciTech Connect

This report tabulates ground-water radiological and chemical data for calendar year 1990 by the Ground-Water Surveillance Project, reported Resource Conservation and Recovery Act (RCRA) Monitoring, and Operational Monitoring. The Ground-Water Surveillance Project is conducted by the Pacific Northwest Laboratory and the RCRA and Operational Monitoring Projects are conducted by the Westinghouse Hanford Company. This document supplements the reports Hanford Site Ground-Water Monitoring for 1990 (Evans et al. 1992) and mental Report for Calendar Year 1990 (Woodruff and Hanf 1991). The data listings provided here were generated from the Hanford Environmental Information System database.

Dresel, P.E.; Bates, D.J.; Merz, J.K.

1993-03-01T23:59:59.000Z

45

Ground Water Management District Rules | Open Energy Information  

Open Energy Info (EERE)

District Rules Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Ground Water Management District Rules Abstract This webpage provides information...

46

GRR/Section 19-TX-b - New Water Right Process For Surface Water and Ground  

Open Energy Info (EERE)

TX-b - New Water Right Process For Surface Water and Ground TX-b - New Water Right Process For Surface Water and Ground Water < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-TX-b - New Water Right Process For Surface Water and Ground Water 19TXBNewWaterRightProcessForSurfaceWaterAndGroundWater.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Texas Water Development Board Regulations & Policies Tex. Water Code § 11 Triggers None specified Click "Edit With Form" above to add content 19TXBNewWaterRightProcessForSurfaceWaterAndGroundWater.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

47

Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona  

SciTech Connect

The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

NONE

1996-03-01T23:59:59.000Z

48

Introduction Application of numerical models of ground water flow  

E-Print Network (OSTI)

(Portniaguine and Solomon 1998), and ground water temperature (Doussan et al. 1994). Compared to calibration depended on calibration methodology; models calibrated with multiple targets simulated q more accurately of Calibration Methodology on Ground Water Flow Predictions by James E. Saiers1, David P. Genereux2, and Carl H

Saiers, James

49

Strategies for Compliance with Stage 2 Disinfectants and Disinfection Byproducts Rule for Surface Water Treatment Facilities in Northeastern Oklahoma.  

E-Print Network (OSTI)

??The Environmental Protection Agency (EPA) recently created new regulations that better protect human health but that also make achieving compliance more difficult for existing water… (more)

Wintle, Brian N.

2012-01-01T23:59:59.000Z

50

Ground-water contribution to dose from past Hanford Operations  

SciTech Connect

The Hanford Environmental Dose Reconstruction (HEDR) Project is being conducted to estimate radiation doses that populations and individuals could have received from Hanford Site operations from 1944 to the present. Four possible pathways by which radionuclides migrating in ground water on the Hanford Site could have reached the public have been identified: (1) through contaminated ground water migrating to the Columbia River; (2) through wells on or adjacent to the Hanford Site; (3) through wells next to the Columbia River downstream of Hanford that draw some or all of their water from the river (riparian wells); and (4) through atmospheric deposition resulting in contamination of a small watershed that, in turn, results in contamination of a shallow well or spring by transport in the ground water. These four pathways make up the ground-water pathway,'' which is the subject of this study. Assessment of the ground-water pathway was performed by (1) reviewing the existing extensive literature on ground water and ground-water monitoring at Hanford and (2) performing calculations to estimate radionuclide concentrations where no monitoring data were collected. Radiation doses that would result from exposure to these radionuclides were calculated.

Freshley, M.D.; Thorne, P.D.

1992-08-01T23:59:59.000Z

51

GROUND-WATER CONTRIBUTION TO DOSE FROM PAST HANFORD OPERATIONS  

SciTech Connect

The Hanford Environmental Dose Reconstruction (HEOR) Project is being conducted to estimate radiation doses that populations and individuals could have received from Hanford Site operations from 1944 to the present. Four possible pathways by which radionuclides originating in ground water on the Hanford Site could have reached the public have been identified: 1) through contaminated ground water migrating to the Columbia River; 2) through wells on or adjacent to the Hanford Site; 3) through wells that draw some or all of their water from the Columbia River (riparian wells); and 4) through atmospheric deposition resulting in the contamination of a small watershed that, in turn, results in contamination of a shallow well or spring. These four pathways make up the "ground-water pathway ," which is the subject of this study. The objective of the study was to assess the extent to which the groundwater pathway contributed to radiation doses that populations or individuals may have received from past operations at Hanford. The assessment presented in this report was performed by 1) reviewing the extensive ?literature on ground water and ground-water monitoring at Hanford and 2) performing simple calculations to estimate radionuclide concentrations in ground water and the Columbia River resulting from ground-water discharge. Radiation doses that would result from exposure to this ground water and surface water were calculated. The study conclusion is that the ground-water pathways did not contribute significantly to dose. Compared with background radiation in the TriCities {300 mrem/yr), estimated doses are small: 0.02 mrem/yr effective dose equivalent from discharge of contaminated ground water to the Columbia River; 1 mrem/yr effective dose equivalent from Hanford Site wells; 11 mrem/yr effective dose equivalent from riparian wells; and 1 mrem/yr effective dose equivalent from the watershed. Because the estimated doses are so small, the recommendation is that further work on the ground-water pathway be limited to tracking ongoing ground-water studies at the Hanford Site.

Freshley, M. D.; Thorne, P. D.

1992-01-01T23:59:59.000Z

52

Assessment of compliance costs resulting from implementation of the proposed Great Lakes water quality guidance  

SciTech Connect

The primary purpose of the study was to develop an estimate of the incremental cost to direct dischargers resulting from the implementation of the proposed Great Lakes Water Quality Guidance (GLWQG). This estimate reflects the incremental cost of complying with permit requirements developed using the Implementation Procedures and water quality criteria proposed in the GLWQG versus permit requirements based on existing State water quality standards. Two secondary analyses were also performed, one to develop a preliminary estimate of the costs that would be incurred by indirect dischargers to publicly owned treatment works (POTWs), and another to evaluate the cost-effectiveness of the GLWQG. Finally, several sensitivity analyses were performed to evaluate the impact of several major assumptions on the estimated compliance costs. To estimate compliance costs, permit limitations and conditions based on existing State water quality standards were compared to water quality-based limitations and conditions based on the proposed GLWQG criteria and Implementation Procedures for a sample of plants. The control measures needed to comply with the proposed GLWQG-based effluent limitations were evaluated. Individual plant compliance costs were estimated for these control measures based on information on treatment technology and cost analyses available in the literature. An overall compliance cost was projected from the sample based on statistical methods.

Fenner, K.; Podar, M.; Snyder, B.

1993-04-16T23:59:59.000Z

53

Ground Water Protection (North Dakota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water Protection (North Dakota) Ground Water Protection (North Dakota) Ground Water Protection (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State North Dakota Program Type Siting and Permitting North Dakota has a degradation prevention program for groundwater protection, with standards established by the Department of Health. This section addresses groundwater standards, quality monitoring, notification

54

Ground Water Protection Act (New Mexico) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Protection Act (New Mexico) Water Protection Act (New Mexico) Ground Water Protection Act (New Mexico) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Mexico Program Type Environmental Regulations Provider New Mexico Environment Department The purpose of the Ground Water Protection Act is to provide substantive

55

Technical background document for the Great Lakes water quality guidance implementation procedures compliance cost study  

SciTech Connect

The document presents the detailed results of the evaluations performed to estimate the compliance costs related to the proposed Great Lakes Water Quality Guidance. Specifically, the document provides the results of the individual evaluations performed on the 59 sample facilities selected to represent the direct discharges to the Great Lakes System.

Parikh, P.; Fenner, K.; Podar, M.; Snyder, B.

1993-04-16T23:59:59.000Z

56

EPA Final Ground Water Rule Available Online, 3/07  

Energy.gov (U.S. Department of Energy (DOE))

On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in...

57

Natural Remediation Potential of Arsenic-Contaminated Ground Water  

Science Journals Connector (OSTI)

Migration of leachate from a municipal landfill in Saco, Maine has resulted in arsenic concentrations in ground water as high as 647 ?g/L.... Laboratory experimental data indicate the primary source of arsenic to...

Kenneth G. Stollenwerk; John A. Colman

2003-01-01T23:59:59.000Z

58

Remedial Costs for MTBE in Soil and Ground Water  

Science Journals Connector (OSTI)

The contamination of MTBE in ground water has introduced concerns about the increased cost of remediating MTBE/BTEX releases compared to remediating sites with BTEX only contamination. In an attempt to evaluat...

Barbara H. Wilson; John T. Wilson Ph.D.

2003-01-01T23:59:59.000Z

59

Analysis of Ground-Water Remediation During a Pesticide Application  

Science Journals Connector (OSTI)

Pesticides are widely used in the pest management. More than one hundred pesticides and their degradation products have been identified as potential ground-water contaminants (Miles, 1992) and many of these pe...

Richard Tykva

1996-01-01T23:59:59.000Z

60

Uranium isotopes in ground water as a prospecting technique  

SciTech Connect

The isotopic concentrations of dissolved uranium were determined for 300 ground water samples near eight known uranium accumulations to see if new approaches to prospecting could be developed. It is concluded that a plot of /sup 234/U//sup 238/U activity ratio (A.R.) versus uranium concentration (C) can be used to identify redox fronts, to locate uranium accumulations, and to determine whether such accumulations are being augmented or depleted by contemporary aquifer/ground water conditions. In aquifers exhibiting flow-through hydrologic systems, up-dip ground water samples are characterized by high uranium concentration values (> 1 to 4 ppB) and down-dip samples by low uranium concentration values (less than 1 ppB). The boundary between these two regimes can usually be identified as a redox front on the basis of regional water chemistry and known uranium accumulations. Close proximity to uranium accumulations is usually indicated either by very high uranium concentrations in the ground water or by a combination of high concentration and high activity ratio values. Ground waters down-dip from such accumulations often exhibit low uranium concentration values but retain their high A.R. values. This serves as a regional indicator of possible uranium accumulations where conditions favor the continued augmentation of the deposit by precipitation from ground water. Where the accumulation is being dispersed and depleted by the ground water system, low A.R. values are observed. Results from the Gulf Coast District of Texas and the Wyoming districts are presented.

Cowart, J.B.; Osmond, J.K.

1980-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Petroleum contaminated ground-water: Remediation using activated carbon  

Science Journals Connector (OSTI)

Ground-water contamination resulting from the leakage of crude oil and refined petroleum products during extraction and processing operations is a serious and a growing environmental problem in Nigeria. Consequently, a study of the use of activated carbon (AC) in the clean up was undertaken with the aim of reducing the water contamination to a more acceptable level. In the experiments described, crude-oil contamination of ground water was simulated under laboratory conditions using ground-water samples collected from existing hand-dug wells at Eagle Island, Port Harcourt, Nigeria. Different masses of the absorbent (i.e., activated carbon) were then added to the samples of ground water. The so treated water samples were left to equilibrate for 7 days, after which the total petroleum hydrocarbon (TPH) contents of the samples were measured. Adsorption isotherms were derived for the two forms of activated carbon used, namely granular activated-carbon (GAC) and powdered activated-carbon (PAC). Results of the TPH analyses showed that activated carbon is an excellent means for the stripping-off of the contaminant: there were decreases in contaminant concentration from an initial concentration of 9304.70 mg/l to average final concentrations of 361.00 and 12.37 mg/l, that is, 96% and 99.9% resulting from the same amounts of GAC and PAC applications respectively. The results of this study revealed that the powdered form of AC would be very effective in the remediation of petroleum-hydrocarbon contaminated ground water and its use is therefore recommended.

M.J. Ayotamuno; R.B. Kogbara; S.O.T. Ogaji; S.D. Probert

2006-01-01T23:59:59.000Z

62

Ground and Surface Water Protection (New Mexico) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Surface Water Protection (New Mexico) and Surface Water Protection (New Mexico) Ground and Surface Water Protection (New Mexico) < Back Eligibility Agricultural Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Program Info State New Mexico Program Type Environmental Regulations Fees Provider New Mexico Environment Department This regulation implements the New Mexico Water Quality Act. Any person intending to make a new water contaminant discharge or to alter the character or location of an existing water contaminant discharge, unless the discharge is being made or will be made into a community sewer system

63

ENVIRONMENTAL ASSESSMENT FOR THE NPDES STORM WATER COMPLIANCE ALTERNATIVES AT THE SRS  

SciTech Connect

The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to evaluate the potential environmental impacts associated with proposed and alternative actions to achieve water quality permit compliance at 38 storm water outfalls located at the Savannah River Site (SRS) (Figure 1-1). Effluent monitoring data indicates that some of these outfalls may not presently comply with new National Pollutant Discharge Elimination System (NPDES) Storm Water General Permit effluent standards that became effective July 1, 2005 (SCR000000). The NPDES permit requires that best management practices (BMPs) be implemented and maintained, as necessary, to ensure that storm water discharges at SRS do not cause or contribute to the contravention of applicable state water quality standards (WQS).

Shedrow, C

2006-11-01T23:59:59.000Z

64

Uranium in US surface, ground, and domestic waters. Volume 2  

SciTech Connect

The report Uranium in US Surface, Ground, and Domestic Waters comprises four volumes. Volumes 2, 3, and 4 contain data characterizing the location, sampling date, type, use, and uranium conentrations of 89,994 individual samples presented in tabular form. The tabular data in volumes 2, 3, and 4 are summarized in volume 1 in narrative form and with maps and histograms.

Drury, J.S.; Reynolds, S.; Owen, P.T.; Ross, R.H.; Ensminger, J.T.

1981-04-01T23:59:59.000Z

65

Volatile Halogenated Hydrocarbons in River Water, Ground Water, Drinking Water and Swimming-Pool Water in the Federal Republic of Germany  

Science Journals Connector (OSTI)

With increasing shortage of ground water it becomes more and more necessary to use surface water as a resource for drinking water and swimming-pool water preparation. In the judgement of water...

M. Sonneborn; S. Gerdes; R. Schwabe

1982-01-01T23:59:59.000Z

66

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process  

Open Energy Info (EERE)

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-c - Designated Ground Water Basin Well Permitting Process 19COCDesignatedGroundWaterBasinWellPermit.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Colorado Ground Water Commission Regulations & Policies CRS 37-90-107 CRS 37-90-108 Ground Water Management District Rules 2 CCR 410-1 - Rules and Regulations for the Management and Control of Designated Ground Water Basins Triggers None specified Click "Edit With Form" above to add content 19COCDesignatedGroundWaterBasinWellPermit.pdf 19COCDesignatedGroundWaterBasinWellPermit.pdf

67

EPA Final Ground Water Rule Available Online, 3/07 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Final Ground Water Rule Available Online, 3/07 EPA Final Ground Water Rule Available Online, 3/07 EPA Final Ground Water Rule Available Online, 3/07 On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in public water systems (PWSs) that use ground water sources for their supply (these systems are known as ground water systems). This Rule establishes a risk-targeted approach to focus on ground water systems that are susceptible to fecal contamination, and requires ground water systems that are at risk of fecal contamination to take corrective action. A minor correction to the final Rule was published on November 21, 2006 (71 FR 67427). The GWR applies to all PWSs2 that use ground water

68

Copyright 2009 The Author(s) Journal compilation 2009 National Ground Water Association.  

E-Print Network (OSTI)

.org Ground Water Monitoring & Remediation 29, no. 3/ Summer 2009/pages 93­104 93 Pore Water CharacteristicsCopyright © 2009 The Author(s) Journal compilation © 2009 National Ground Water Association. NGWA area). The concentrations of ethanol in ground water for both the bench- and pilot-scale experiments

Alvarez, Pedro J.

69

Case History of a Clean Water Act Compliance Agreement at the Rocky Flats Environmental Technology Site near Golden, Colorado  

SciTech Connect

A major Clean Water Act (CWA) Federal Facilities Compliance Agreement was signed on March 25, 1991 by the US Department of Energy, Rocky Flats Field Office (DOE, RFFO) and the Water Enforcement Division of the Environmental Protection Agency (EPA), Region VIII. The agreement revised the Rocky Flats Plant`s National Pollutant Discharge Elimination System (NPDES) permit and arose from pemittee-requested changes in effluent monitoring points and permit violations, most notably the February 22, 1989 Chromic Acid Incident. The Rocky Flats Plant, now called the Rocky Flats Environmental Technology Site (Site) near Golden Colorado was operated at that time by Rockwell International Corporation, who later plead guilty to six misdemeanor and felony counts of the CWA (the aforementioned NPDES permit violations) and paid a $4 million fine on March 26, 1992. The Compliance Agreement, hereafter referred to as the NPDES FFCA, called for three separate remedial action plans and contained a schedule for their submittal to the EPA. The compliance plans focussed on: (1) Waste Water Treatment Plant (WWTP) performance upgrades, (2) source control and surface water protection, and (3) characterization of the impacts from past sludge disposal practices. Projects that implemented the compliance plans were initiated soon after submittal to the EPA and are forecast to complete in 1997 at a total cost of over $35 million. This paper presents a case history of NPDES FFCA compliance projects and highlights the successes, failures, and lessons learned.

Thompson, J.S.

1995-08-01T23:59:59.000Z

70

Ground and Water Source Heat Pump Performance and Design for Southern Climates  

E-Print Network (OSTI)

Ground and water source heat pump systems have very attractive performance characteristics when properly designed and installed. These systems typically consist of a water-to-air or water-to-water heat pump linked to a closed loop vertical...

Kavanaugh, S.

1988-01-01T23:59:59.000Z

71

HANFORD SITE ENVIRONMENTAL DATA FOR CALENDAR YEAR 1989 - GROUND WATER  

SciTech Connect

In a continuing effort for the U.S. Department of Energy, Pacific Northwest Laboratory (PNL) is conducting ground-water monitoring at the Hanford Site, near Richland, Washington. This document contains the data listing of monitoring results obtained by PNL and Westinghouse Hanford Company during the period January through December 1989. Samples taken during 1989 were analyzed and reported by United States Testing Company, Inc., Richland, Washington. The data listing contains all chemical results (above contractual reporting limits) and radiochemical results (for which the result is larger than two times the total error).

Bryce, R. W.; Gorst, W. R.

1990-12-01T23:59:59.000Z

72

Remediation of a uranium-contamination in ground water  

SciTech Connect

The former production site of NUKEM where nuclear fuel-elements were developed and handled from 1958 to 1988 was situated in the centre of an industrial park for various activities of the chemical and metallurgical industry. The size of the industrially used part is about 300.000 m{sup 2}. Regulatory routine controls showed elevated CHC (Chlorinated Hydro-Carbons) values of the ground water at the beginning of the 1990's in an area which represented about 80.000 m{sup 2} down-gradient of locations where CHC compounds were stored and handled. Further investigations until 1998 proved that former activities on the NUKEM site, like the UF{sub 6} conversion process, were of certain relevance. The fact that several measured values were above the threshold values made the remediation of the ground water mandatory. This was addressed in the permission given by the Ministry for Nuclear Installations and Environment of Hesse according to chap. 7 of the German atomic law in October 2000. Ground water samples taken in an area of about 5.000 m{sup 2} showed elevated values of total Uranium activity up to between 50 and 75 Bq/l in 2002. Furthermore in an area of another 20.000 m{sup 2} the samples were above threshold value. In this paper results of the remediation are presented. The actual alpha-activities of the ground waters of the remediation wells show values of 3 to 9 Bq/l which are dominated by 80 to 90 % U-234 activity. The mass-share of total Uranium for this nuclide amounts to 0,05% on average. The authority responsible for conventional water utilisation defined target values for remediation: 20 {mu}g/l for dissolved Uranium and 10 {mu}g/l for CHC. Both values have not yet been reached for an area of about 10.000 m{sup 2}. The remediation process by extracting water from four remediation wells has proved its efficiency by reduction of the starting concentrations by a factor of 3 to 6. Further pumping will be necessary especially in that area of the site where the contaminations were found later during soil remediation activities. Only two wells have been in operation since July 2002 when the remediation technique was installed and an apparatus for direct gamma-spectroscopic measurement of the accumulated activities on the adsorbers was qualified. Two further remediation wells have been in operation since August 2006, when the installed remediation technique was about to be doubled from a throughput of 5 m{sup 3}/h to 10 m{sup 3}/h. About 20.000 m{sup 3} of ground water have been extracted since from these two wells and the decrease of their Uranium concentrations behaves similar to that of the two other wells being extracted since the beginning of remediation. Both, total Uranium-concentrations and the weight-share of the nuclides U-234, U-235 and U-238 are measured by ICP-MS (Inductively Coupled Plasma - Mass Spectrometry) besides measurements of Uranium-Alpha-Activities in addition to the measurement of CHC components of which PCE (Per-chlor-Ethene) is dominant in the contaminated area. CHC compounds are measured by GC (Gas Chromatography). Down-gradient naturally attenuated products are detected in various compositions. Overall 183.000 m{sup 3} of ground water have been extracted. Using a pump and treat method 11 kg Uranium have been collected on an ion-exchange material based on cellulose, containing almost 100 MBq U-235 activity, and almost 15 kg of CHC, essentially PCE, were collected on GAC (Granules of Activated Carbon). Less than 3% of the extracted Uranium have passed the adsorber-system of the remediation plant and were adsorbed by the sewage sludge of the industrial site's waste water treatment. The monthly monitoring of 19 monitoring wells shows that an efficient artificial barrier was built up by the water extraction. The Uranium contamination of two ground water plumes has drastically been reduced by the used technique dependent on the amounts of extracted water. The concentration of the CHC contamination has changed depending on the location of temporal pumping. Thereby maximum availability of this contaminan

Woerner, Joerg; Margraf, Sonja; Hackel, Walter [RD Hanau GmbH (Germany)

2007-07-01T23:59:59.000Z

73

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada  

E-Print Network (OSTI)

The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of the important hydrologic characteristics is a steep gradient on the ground-water table...

Lee, Si-Yong

2012-06-07T23:59:59.000Z

74

70 Ground Water Monitoring & Remediation 31, no. 4/ Fall 2011/pages 7076 NGWA.org 2011, The Author(s)  

E-Print Network (OSTI)

70 Ground Water Monitoring & Remediation 31, no. 4/ Fall 2011/pages 70­76 NGWA.org © 2011, The Author(s) Ground Water Monitoring & Remediation © 2011, National Ground Water Association. doi: 10.1111/j 93% to 117% for both spiked laboratory reagent water and natural ground- water matrices, the later

Alvarez, Pedro J.

75

5 CCR 1002-42 Site Specific Water Quality Standards for Ground...  

Open Energy Info (EERE)

Specific Water Quality Standards for Ground Water Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: 5 CCR 1002-42 Site Specific Water...

76

GRR/Section 14-CO-e - Ground Water Discharge Permit | Open Energy  

Open Energy Info (EERE)

CO-e - Ground Water Discharge Permit CO-e - Ground Water Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CO-e - Ground Water Discharge Permit 14COEGroundWaterDischargePermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Water Quality Control Act 5 CCR 1002-61 Colorado Discharge Permit System 5 CCR 1002-41 Basic Standards for Ground Water 5 CCR 1002-42 Site Specific Water Quality Standards for Ground Water Triggers None specified Click "Edit With Form" above to add content 14COEGroundWaterDischargePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

77

GRR/Section 4-NV-b - Temporary Use of Ground Water for Exploration | Open  

Open Energy Info (EERE)

b - Temporary Use of Ground Water for Exploration b - Temporary Use of Ground Water for Exploration < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-NV-b - Temporary Use of Ground Water for Exploration 04NVBTemporaryUseOfGroundWaterForExploration.pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Regulations & Policies NAC 534.444 Waiver to use water to explore for oil, gas or geothermal resources Triggers None specified Click "Edit With Form" above to add content 04NVBTemporaryUseOfGroundWaterForExploration.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Water Resources (NDWR) may grant a waiver of the

78

Regional ground-water mixing and the origin of saline fluids: Midcontinent, United States  

SciTech Connect

Ground waters in three adjacent regional flow systems in the midcontinent exhibit extreme chemical and isotopic variations that delineate large-scale fluid flow and mixing processes and two distinct mechanisms for the generation of saline fluids. Systematic spatial variations of major ion concentrations, H, O, and Sr isotopic compositions, and ground-water migration pathways indicate that each flow system contains water of markedly different origin. Mixing of the three separate ground waters exerts a fundamental control on ground-water composition. The three ground waters are: (i) dilute meteoric water recharged in southern Missouri; (ii) saline Na-Ca-Cl water in southeastern Kansas of far-traveled meteoric origin that acquired its salinity by halite dissolution; and (iii) Na-Ca-Cl brines in north-central Oklahoma that may have originated as Paleozoic seawater. 45 refs., 4 figs., 1 tab.

Musgrove, M.; Banner, J.L. (Univ. of Texas, Austin (United States))

1993-03-26T23:59:59.000Z

79

Dynamics of Transboundary Ground Water Management: Lessons from1 North America2  

E-Print Network (OSTI)

-Society-Science in Transition. Water Resources Development and8 Management Series, Berlin: Springer-Verlag, pp. 167-196]9 101 Dynamics of Transboundary Ground Water Management: Lessons from1 North America2 Michael E Abstract11 Transboundary ground water management in the North American countries of Canada, the United

Kurapov, Alexander

80

A Multiscale Investigation of Ground Water Flow at Clear Lake, Iowa  

E-Print Network (OSTI)

targets. The model produced ground water inflow and outflow rates of 14,300 and 9200 m3/d, respectively­related problems in the lake and its water- shed, their likely causes, and potential remedial measuresA Multiscale Investigation of Ground Water Flow at Clear Lake, Iowa by William W. Simpkins Abstract

Simpkins, William W.

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NGWA.org Ground Water Monitoring & Remediation 31, no. 3/ Summer 2011/pages 4754 47 2011, The Author(s)  

E-Print Network (OSTI)

NGWA.org Ground Water Monitoring & Remediation 31, no. 3/ Summer 2011/pages 47­54 47 © 2011, The Author(s) Ground Water Monitoring & Remediation © 2011, National Ground Water Association. doi: 10.1111/j underground stor- age. Thus, it is important to investigate the potential ground- water quality impacts

Alvarez, Pedro J.

82

Development and Application of a Ground-Coupled Heat Pump Simulation Model for Residential Code-Compliance Simulation in Texas  

E-Print Network (OSTI)

is extracted from the ground in the heating mode, or heat is rejected to the ground in the cooling mode. GSHP systems, therefore, reduce the amount of electricity used by the heat pump system by utilizing geothermal energy to more efficiently heat and cool...

Do, Sung Lok

2014-04-18T23:59:59.000Z

83

Non-Lawyers' Guide to Hearings before the Colorado Ground Water...  

Open Energy Info (EERE)

Lawyers' Guide to Hearings before the Colorado Ground Water Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

84

Verification of Active and Passive Ground-Water Contamination Remediation Efforts  

Science Journals Connector (OSTI)

The verification of ground-water contamination remediation efforts requires thorough documentation of subsurface conditions ... comprehensive approach to the design and operation of remediation efforts with an em...

M. J. Barcelona

1995-01-01T23:59:59.000Z

85

E-Print Network 3.0 - alkaline ground waters Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

water from the Lake Calumet... , and ground ... Source: Bethke, Craig - Department of Geology, University of Illinois at Urbana-Champaign Collection: Environmental Sciences and...

86

Compliance Agreements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance » Compliance Compliance » Compliance Agreements Compliance Agreements This photo shows the Savannah River Site’s Heavy Water Components Test Reactor during decommissioning. This photo shows the Savannah River Site's Heavy Water Components Test Reactor during decommissioning. Compliance agreements illustrate and help support the development of effective compliance approaches and strategies, and can assist in promoting greater cooperation, coordination, and consistency with other EM offices, Departmental organizations, and State agencies. Please click the site or location name to view a listing of the associated agreements and summaries. Idaho Oak Ridge Paducah Portsmouth Richland/Office of River Protection Savannah River Closure Sites NNSA Sites West Valley Demonstration Project

87

GRR/Section 19-CO-i - Determination of Nontributary Ground Water Status |  

Open Energy Info (EERE)

19-CO-i - Determination of Nontributary Ground Water Status 19-CO-i - Determination of Nontributary Ground Water Status < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-i - Determination of Nontributary Ground Water Status 19COIDeterminationOfNontributaryGroundWaterStatus.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Regulations & Policies Colorado Division of Water Resources Policy 2010-4 CRS 37-90-137 Permits to Construct Wells Outside of Designated Basins CRS 37-90-103 Underground Water Definitions CRS 37-82-101 Waters of Natural Surface Streams Subject to Appropriation CRS 37-92-102 Legislative Declaration - Basic Tenets of Colorado Water Law Triggers None specified Click "Edit With Form" above to add content

88

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada.  

E-Print Network (OSTI)

??The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of… (more)

Lee, Si-Yong

2012-01-01T23:59:59.000Z

89

Water resources data for Florida, water year 1992. Volume 1B. Northeast Florida ground water. Water-data report (Annual) October 1, 1991-September 30, 1992  

SciTech Connect

Water resources data for the 1992 for northeast Florida include continuous or daily discharge for 140 streams, periodic discharge for 10 streams, miscellaneous discharge for 14 streams, continuous or daily stage for 32 streams, continuous or daily tide stage for 3 sites, periodic stage for 23 streams, peak discharge for 3 streams, and peak stage for 11 streams; continuous or daily elevations for 36 lakes, periodic elevations for 47 lakes; continuous ground-water levels for 75 wells, periodic ground-water levels for 123 wells, and miscellaneous water-level measurements for 864 wells; and quality-of-water data for 38 surface-water sites and 66 wells.

Not Available

1993-01-01T23:59:59.000Z

90

NGWA.org Ground Water Monitoring & Remediation 31, no. 3/ Summer 2011/pages 111118 111 2011, The Author(s)  

E-Print Network (OSTI)

NGWA.org Ground Water Monitoring & Remediation 31, no. 3/ Summer 2011/pages 111­118 111 © 2011, The Author(s) Ground Water Monitoring & Remediation © 2011, National Ground Water Association. doi: 10.1111/j under- ground storage tank containing biofuel blends. Benzene is of particular concern due to its

Alvarez, Pedro J.

91

Ground-Water Table and Chemical Changes in an Alluvial Aquifer During  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground-Water Table and Chemical Changes in an Alluvial Aquifer Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells More Documents & Publications Performance Assessment and Recommendations for Rejuvenation of a Permeable Reactive Barrier: Cotter Corporation's Cañon City, Colorado, Uranium

92

Ground-Water Table and Chemical Changes in an Alluvial Aquifer During  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground-Water Table and Chemical Changes in an Alluvial Aquifer Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells Ground-Water Table and Chemical Changes in an Alluvial Aquifer During Sustained Pumping at the Monticello, Utah, Zero-Valent Iron Treatment Cells More Documents & Publications Performance Assessment and Recommendations for Rejuvenation of a Permeable Reactive Barrier: Cotter Corporation's Cañon City, Colorado, Uranium

93

Construction Summary and As-Built Report for Ground Water Treatment System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Summary and As-Built Report for Ground Water Treatment Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site More Documents & Publications Dispersivity Testing of Zero-Valent Iron Treatment Cells: Monticello, Utah, November 2005 Through February 2008 Third (March 2006) Coring and Analysis of Zero-Valent Iron Permeable Reactive Barrier, Monticello, Utah Performance Assessment and Recommendations for Rejuvenation of a Permeable

94

Desalination of brackish ground waters and produced waters using in-situ precipitation.  

SciTech Connect

The need for fresh water has increased exponentially during the last several decades due to the continuous growth of human population and industrial and agricultural activities. Yet existing resources are limited often because of their high salinity. This unfavorable situation requires the development of new, long-term strategies and alternative technologies for desalination of saline waters presently not being used to supply the population growth occurring in arid regions. We have developed a novel environmentally friendly method for desalinating inland brackish waters. This process can be applied to either brackish ground water or produced waters (i.e., coal-bed methane or oil and gas produced waters). Using a set of ion exchange and sorption materials, our process effectively removes anions and cations in separate steps. The ion exchange materials were chosen because of their specific selectivity for ions of interest, and for their ability to work in the temperature and pH regions necessary for cost and energy effectiveness. For anion exchange, we have focused on hydrotalcite (HTC), a layered hydroxide similar to clay in structure. For cation exchange, we have developed an amorphous silica material that has enhanced cation (in particular Na{sup +}) selectivity. In the case of produced waters with high concentrations of Ca{sup 2+}, a lime softening step is included.

Krumhansl, James Lee; Pless, Jason; Nenoff, Tina Maria; Voigt, James A.; Phillips, Mark L. F.; Axness, Marlene; Moore, Diana Lynn; Sattler, Allan Richard

2004-08-01T23:59:59.000Z

95

Ground-water contribution to dose from past Hanford Operations. Hanford Environmental Dose Reconstruction Project  

SciTech Connect

The Hanford Environmental Dose Reconstruction (HEDR) Project is being conducted to estimate radiation doses that populations and individuals could have received from Hanford Site operations from 1944 to the present. Four possible pathways by which radionuclides migrating in ground water on the Hanford Site could have reached the public have been identified: (1) through contaminated ground water migrating to the Columbia River; (2) through wells on or adjacent to the Hanford Site; (3) through wells next to the Columbia River downstream of Hanford that draw some or all of their water from the river (riparian wells); and (4) through atmospheric deposition resulting in contamination of a small watershed that, in turn, results in contamination of a shallow well or spring by transport in the ground water. These four pathways make up the ``ground-water pathway,`` which is the subject of this study. Assessment of the ground-water pathway was performed by (1) reviewing the existing extensive literature on ground water and ground-water monitoring at Hanford and (2) performing calculations to estimate radionuclide concentrations where no monitoring data were collected. Radiation doses that would result from exposure to these radionuclides were calculated.

Freshley, M.D.; Thorne, P.D.

1992-08-01T23:59:59.000Z

96

Effectiveness of aquamag ground brucite in water treatment processes  

Science Journals Connector (OSTI)

We present the results of laboratory tests of the physical and chemical properties of two size fractions of Aquamag ground brucite (particle sizes 0–45 µm and ... acid), as well as the effectiveness of brucite fo...

A. N. Belevtsev; S. A. Baikova; V. I. Zhavoronkova; N. N. Mel’nikova…

2007-05-01T23:59:59.000Z

97

Basics of pump-and-treat ground-water remediation technology. Special report  

SciTech Connect

The pump-and-treat process, whereby contaminated ground water is pumped to the surface for treatment, is one of the most common ground-water remediation technologies used at hazardous waste sites. However, recent research has identified complex chemical and physical interactions between contaminants and the subsurface media which may impose limitations on the extraction part of the process. The report was developed to summarize the basic considerations necessary to determine when, where, and how pump-and-treat technology can be used effectively to remediate ground-water contamination.

Mercer, J.W.; Skipp, D.C.; Giffin, D.

1990-03-01T23:59:59.000Z

98

Study of the distribution of 226Ra in ground water near the uranium industry of Jharkhand, India  

Science Journals Connector (OSTI)

......levels of 226Ra observed in the ground water. Being a mineralised area, variation...226Ra activity concentration in ground water that is used for drinking purpose...Cretescu I. Characterisation and remediation of soils contaminated with uranium......

R. M. Tripathi; V. N. Jha; S. K. Sahoo; N. K. Sethy; A. K. Shukla; V. D. Puranik; H. S. Kushwaha

2012-01-01T23:59:59.000Z

99

DC WRRC Report No. 127 GROUND WATER RESOURCE ASSESSMENT STUDY FOR  

E-Print Network (OSTI)

of the District of Columbia 4200 Connecticut Ave, NW Building 50, MB 5004 Washington, DC 20008 #12;ABSTRACT TITLE pollution on the District of Columbia's ground water. 'PROJECT STAFF *GOURND WATER RESOURCE ASSESSMENT STUDY Affairs Environmental Regulation Administration Water Resources Management Division Washington, DC 20020

District of Columbia, University of the

100

Field-scale estimation of volumetric water content using ground-penetrating radar ground wave techniques  

E-Print Network (OSTI)

sampling, time domain reflectometry (TDR), neutron probe logging, and tensiometers [Prichard, 1999 were compared to gravimetric water content, time domain reflectometry, and soil texture measurements

Hubbard, Susan

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NGWA.org Ground Water Monitoring & Remediation 00, no. 0/ xxxx 0000/pages 0000 1 2012, The Author(s)  

E-Print Network (OSTI)

NGWA.org Ground Water Monitoring & Remediation 00, no. 0/ xxxx 0000/pages 00­00 1 © 2012, The Author(s) Ground Water Monitoring & Remediation © 2012, National Ground Water Association. doi: 10.1111/j). Bioaugmentation remediation methods that employ Dehalococcoides sp. (DHC) have been widely tested for treating

Clement, Prabhakar

102

Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming  

SciTech Connect

This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site.

Not Available

1994-09-01T23:59:59.000Z

103

Ground penetrating radar characterization of wood piles and the water table in Back Bay, Boston  

E-Print Network (OSTI)

Ground penetrating radar (GPR) surveys are performed to determine the depth to the water table and the tops of wood piles beneath a residential structure at 122 Beacon Street in Back Bay, Boston. The area of Boston known ...

LeFrançois, Suzanne O'Neil, 1980-

2003-01-01T23:59:59.000Z

104

Public and Private Initiatives to Develop Ground Water Remediation Technologies in the U.S  

Science Journals Connector (OSTI)

Ground water at most hazardous waste sites in the ... most often the limiting factor for complete site remediation. Until recently, contaminants in surface soils ... were viewed as the only significant source of

Walter W. Kovalick Jr.; Rich Steimle

1996-01-01T23:59:59.000Z

105

Ground water remediation at the Moab, Utah, USA, former uranium-ore processing site  

Science Journals Connector (OSTI)

Seepage from the Moab, Utah, USA, former uranium-ore processing site resulted in ammonia and uranium contamination of naturally occurring saline ground water in alluvium adjacent to the Colorado River. An interim...

Donald R. Metzler; Joseph D. Ritchey; Kent A. Bostick…

2008-01-01T23:59:59.000Z

106

Prediction of postmine ground-water quality at a Texas surface lignite mine  

E-Print Network (OSTI)

The prediction Of postmine ground-water quality is encumbered with many complications resulting from the complex hydrologic system found in mine spoils. Current analytical methods such as acid/base accounting have only had limited success...

Wise, Clifton Farrell

1995-01-01T23:59:59.000Z

107

Ground-Based and Airborne (PMS 2-D Probe Canister-Mounted) 183 GHz Water  

NLE Websites -- All DOE Office Websites (Extended Search)

Ground-Based and Airborne (PMS 2-D Probe Canister-Mounted) 183 GHz Water Ground-Based and Airborne (PMS 2-D Probe Canister-Mounted) 183 GHz Water Vapor Radiometer Pazmany, Andrew ProSensing Inc. Category: Instruments ProSensing Inc. has developed a G-band (183 GHz, 1.5 mm wavelength) water vapor radiometer (GVR) for the measurement of low concentrations of atmospheric water vapor and liquid water. The instrument's precipitable water vapor measurement precision is approximately 0.01 mm in dry (<2 mm vapor column) conditions. The ground-based version of the instrument was first deployed at ProSensing's facility in Amherst, MA in February 2005, then at the North Slope of Alaska DOE ARM site in Barrow AK in April 2005, where it has been continuously operating since. An airborne version, designed to operate from a standard PMS 2-D probe canister, is now being

108

GRR/Section 14-TX-e - Ground Water Discharge Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-TX-e - Ground Water Discharge Permit GRR/Section 14-TX-e - Ground Water Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-TX-e - Ground Water Discharge Permit 14TXEGroundWaterDischargePermit (1).pdf Click to View Fullscreen Contact Agencies Railroad Commission of Texas United States Environmental Protection Agency Regulations & Policies 16 TAC 3.8 (Rule 8) Triggers None specified Click "Edit With Form" above to add content 14TXEGroundWaterDischargePermit (1).pdf 14TXEGroundWaterDischargePermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Pits are used in drilling operations to contain drilling related fluids and

109

A new technique to monitor ground-water quality at municipal solid waste landfills  

E-Print Network (OSTI)

A NEW TECHNIQUE TO MONITOR GROUND-WATER EQUALITY AT MUNICIPAL SOLID WASTE LANDFILLS A Thesis by STEVEN CHARLES HART Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE May 1989 Major Subject: Geology A NEW TECHNIIIUE TO MONITOR GROUND-WATER IIUALITY AT MUNICIPAL SOLID WASTE LANDFILLS A Thesis by STEVEN CHARLES HART Approved as to style and content by: Christo her C. Mathewson (Chair...

Hart, Steven Charles

2012-06-07T23:59:59.000Z

110

Ground-water resources of Lanfair and Fenner Valleys and vicinity, San Bernardino County, California  

SciTech Connect

Lanfair and Fenner Valleys and vicinity cover about 1300 square miles in eastern San Bernardino County, California. Average annual precipitation ranges from 3 to 10 inches over the area. Ground water is utilized primarily for stock and domestic purposes, and occurs in the unconsolidated deposits as well as in the highly fractured consolidated rocks. Ground-water levels in wells range from 5 to 600 feet below land surface, and well yields range from 3 to 1200 gallons per minute throughout the study area. Records indicate that water levels are at or near their predevelopment levels. Springs occur along faults and formational contacts and generally discharge less than 5 gallons per minute. Measured ground-water outflow from Lanfair Valley at Piute Spring ranged from 100 to 630 acre-feet per year. Outflow from Fenner Valley was estimated to be 270 acre-feet per year. Most of the water is of good quality for domestic and stock use. However, water from two wells indicates a concentration of sulfate that exceeds the recommended limit for drinking water. Water supplies are adequate for present needs. However, large-scale pumping would result in the lowering of the water table and a reduction of the ground water in storage. 10 refs., 2 figs., 4 tabs.

Freiwald, D.A.

1984-07-01T23:59:59.000Z

111

GRR/Section 14-UT-e - Ground Water Quality Protection Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-UT-e - Ground Water Quality Protection Permit GRR/Section 14-UT-e - Ground Water Quality Protection Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-UT-e - Ground Water Quality Protection Permit 14UTEGroundWaterQualityProtectionPermit.pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies UAC R317-6 Triggers None specified Click "Edit With Form" above to add content 14UTEGroundWaterQualityProtectionPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Utah Department of Environmental Quality (DEQ) regulates discharges

112

Radiological conditions at Bikini Atoll: Radionuclide concentrations in vegetation, soil, animals, cistern water, and ground water  

SciTech Connect

This report is intended as a resource document for the eventual cleanup of Bikini Atoll and contains a summary of the data for the concentrations of /sup 137/Cs, /sup 90/Sr, /sup 239 +240/Pu, and /sup 241/Am in vegetation through 1987 and in soil through 1985 for 14 islands at Bikini Atoll. The data for the main residence island, Bikini, and the most important island, Eneu, are extensive; these islands have been the subject of a continuing research and monitoring program since 1974. Data for radionuclide concentrations in ground water, cistern water, fish and other marine species, and pigs from Bikini and Eneu Islands are presented. Also included are general summaries of our resuspension and rainfall data from Bikini and Eneu Islands. The data for the other 12 islands are much more limited because samples were collected as part of a screening survey and the islands have not been part of a continuing research and monitoring program. Cesium-137 is the radionuclide that produces most of the estimated dose for returning residents, mostly through uptake by terrestrial foods and secondly by direct external gamma exposure. Remedial measures for reducing the /sup 137/Cs uptake in vegetation are discussed. 40 refs., 32 figs., 131 tabs.

Robison, W.L.; Conrado, C.L.; Stuart, M.L.

1988-05-31T23:59:59.000Z

113

Radon concentrations in ground and drinking water in the state of Chihuahua, Mexico  

Science Journals Connector (OSTI)

This paper reports 222Rn concentrations in ground and drinking water of nine cities of Chihuahua State, Mexico. Fifty percent of the 114 sampled wells exhibited 222Rn concentrations exceeding 11 Bq/L, the maximum contaminant level (MCL) recommended by the USEPA. Furthermore, around 48% (123 samples) of the tap-water samples taken from 255 dwellings showed radon concentrations over the MCL. There is an apparent correlation between total dissolved solids and radon concentration in ground-water. The high levels of 222Rn found may be entirely attributed to the nature of aquifer rocks.

L. Villalba; L. Colmenero Sujo; M.E. Montero Cabrera; A. Cano Jiménez; M. Rentería Villalobos; C.J. Delgado Mendoza; L.A. Jurado Tenorio; I. Dávila Rangel; E.F. Herrera Peraza

2005-01-01T23:59:59.000Z

114

CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE August 2, 2010 - 12:00pm Addthis A sheep’s foot roller compacts the tailings in the disposal cell. A sheep's foot roller compacts the tailings in the disposal cell. Moab, UT MILL TAILINGS REMOVAL Sixteen million tons of uranium mill tailings 80 feet high stood on the banks of the Colorado River near Moab in southeast Utah, as a legacy to the former ore-processing site that operated for nearly three decades beginning in the mid-1950s. That is until April 2009, when the U.S. Department of Energy began moving the tailings by rail to an engineered disposal cell constructed 30 miles north near Crescent Junction, Utah. The mill tailings,

115

Ground water impact assessment report for the 216-B-3 Pond system  

SciTech Connect

Ground water impact assessments were required for a number of liquid effluent receiving sites according to the Hanford Federal Facility Agreement and Consent Order Milestones M-17-00A and M-17-00B, as agreed upon by the US Department of Energy. This report is one of the last three assessments required and addresses the impact of continued discharge of uncontaminated wastewater to the 216-B-3C expansion lobe of the B Pond system in the 200 East Area until June 1997. Evaluation of past and projected effluent volumes and composition, geohydrology of the receiving site, and contaminant plume distribution patterns, combined with ground water modeling, were used to assess both changes in ground water flow regime and contaminant-related impacts.

Johnson, V.G.; Law, A.G.; Reidel, S.P.; Evelo, S.D.; Barnett, D.B.; Sweeney, M.D.

1995-01-01T23:59:59.000Z

116

40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond  

SciTech Connect

This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.

Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

1989-03-01T23:59:59.000Z

117

Pattern Of Shallow Ground Water Flow At Mount Princeton Hot Springs,  

Open Energy Info (EERE)

Pattern Of Shallow Ground Water Flow At Mount Princeton Hot Springs, Pattern Of Shallow Ground Water Flow At Mount Princeton Hot Springs, Colorado, Using Geoelectrical Methods Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Pattern Of Shallow Ground Water Flow At Mount Princeton Hot Springs, Colorado, Using Geoelectrical Methods Details Activities (2) Areas (1) Regions (0) Abstract: In geothermal fields, open faults and fractures often act as high permeability pathways bringing hydrothermal fluids to the surface from deep reservoirs. The Mount Princeton area, in south-central Colorado, is an area that has an active geothermal system related to faulting and is therefore a suitable natural laboratory to test geophysical methods. The Sawatch range-front normal fault bordering the half-graben of the Upper Arkansas

118

Evidence for ground-water circulation in the brine-filled aquitard, Oak Ridge, Tennessee  

SciTech Connect

Various geologic, hydrologic, and geochemical methods were used to assess active ground-water circulation in a brine-filled, deep (> 50 m below land surface) aquitard underlying the Oak Ridge Reservation, Tennessee. In places, the brine which was presumed to be stagnant in the past, contains various contaminants. If ground-water circulation is viable in the brine-containing formations, then remediation or containment of the deep-seated contaminants should be considered a high priority. Data used to determine this included (1) spatial and temporal pressures and hydraulic heads measured in the aquitard, (2) hydraulic parameters of the formations in question, (3) vertical temperature gradients, and (4) spatial and temporal chemical and isotopic composition of the saline ground water. Conclusions suggest that the saline water contained at depth is not isolated (in terms of recharge and discharge) from the overlying active and fresh-water-(< 500 mg/l) bearing units. Consequently, influx of young water (and contamination) from land surface does occur. Potential discharge into the shallow aquifers was assumed where the hydraulic head of the saline water was higher than that in the shallow aquifers, accounting for temperature and salinity anomalies observed close to land surface. The confined water (and dissolved solutes) move along open conduits at relatively high velocity into adjacent, more permeable units.

Nativ, R. [Hebrew Univ. of Jerusalem (Israel). Dept. of Soil and Water Sciences; Halleran, A.; Hunley, A. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

1997-07-01T23:59:59.000Z

119

Ground-water hydrology of the Panther Junction area of Big Bend National Park, Texas  

E-Print Network (OSTI)

GROUND-WATER HYDROLOGY OF THE PANTHER JUNCTION AREA OF BIG BEND NATIONAL PARK, TEXAS A Thesis by JOHN LAWRENCE GIBSON Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE August 1983 Major Subject: Geology GROUND-WATER HYDROLOGY OF THE PANTHER JUNCTION AREA OF BIG BEND NATIONAL PARK, TEXAS A Thesis by JOHN LAWRENCE GIBSON Approved as to style and content by: Melv'n C. Schroeder (Chairman...

Gibson, John Lawrence

2012-06-07T23:59:59.000Z

120

Methods of minimizing ground-water contamination from in situ leach uranium mining. Final report  

SciTech Connect

This is the final report of a research project designed to study methods of minimizing ground-water contamination from in situ leach uranium mining. Fieldwork and laboratory experiments were conducted to identify excursion indicators for monitoring purposes during mining, and to evaluate effective aquifer restoration techniques following mining. Many of the solution constituents were found to be too reactive with the aquifer sediments to reliably indicate excursion of leaching solution from the ore zone; however, in many cases, the concentrations of chloride and sulfate and the total dissolved solids level of the solution were found to be good excursion indicators. Aquifer restoration by ground-water sweeping consumed large quantities of ground water and was not effective for the redox-sensitive contaminants often present in the ore zone. Surface treatment methods such as reverse osmosis and electrodialysis were effective in reducing the amount of water used, but also had the potential for creating conditions in the aquifer under which the redox-sensitive contaminants would be mobile. In situ restoration by chemical reduction, in which a reducing agent is added to the solution recirculated through the ore zone during restoration, can restore the ore-zone sediment as well as the ground water. This method could lead to a stable chemical condition in the aquifer similar to conditions before mining. 41 figures.

Deutsch, W.J.; Martin, W.J.; Eary, L.E.; Serne, R.J.

1985-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

LRH: WETLANDS, Vol. 22, No. 3, 2002 RRH: Barbiro et al., GEOCHEMISTRY OF WATER AND GROUND WATER IN  

E-Print Network (OSTI)

LRH: WETLANDS, Vol. 22, No. 3, 2002 RRH: Barbiéro et al., GEOCHEMISTRY OF WATER AND GROUND WATER of the Nhecolândia, a sub-region of the Pantanal wetland in Brazil, is the presence of both saline and freshwater manuscript, published in "Wetlands 22, 3 (2002) 528-540" DOI : 10.1672/0277-5212(2002)022[0528:GOWAGW]2.0.CO

Paris-Sud XI, Université de

122

Borehole summary report for five ground-water monitoring wells constructed in the 1100 Area  

SciTech Connect

This report contains the data collected during the installation and initial sampling of five ground-water monitoring wells between the 1100 Area and Richland City water supply wells. The five wells were installed to provide for early detection of contaminants and to provide data that may be used in making decisions on the management of the North Richland Well Field and recharge basins. 2 refs., 1 fig.

Bryce, R.W.; Goodwin, S.M.

1989-05-01T23:59:59.000Z

123

Effect of faulting on ground-water movement in the Death Valley region, Nevada and California  

SciTech Connect

This study characterizes the hydrogeologic system of the Death Valley region, an area covering approximately 100,000 square kilometers. The study also characterizes the effects of faults on ground-water movement in the Death Valley region by synthesizing crustal stress, fracture mechanics,a nd structural geologic data. The geologic conditions are typical of the Basin and Range Province; a variety of sedimentary and igneous intrusive and extrusive rocks have been subjected to both compressional and extensional deformation. Faulting and associated fracturing is pervasive and greatly affects ground-water flow patterns. Faults may become preferred conduits or barriers to flow depending on whether they are in relative tension, compression, or shear and other factors such as the degree of dislocations of geologic units caused by faulting, the rock types involved, the fault zone materials, and the depth below the surface. The current crustal stress field was combined with fault orientations to predict potential effects of faults on the regional ground-water flow regime. Numerous examples of fault-controlled ground-water flow exist within the study area. Hydrologic data provided an independent method for checking some of the assumptions concerning preferential flow paths. 97 refs., 20 figs., 5 tabs.

Faunt, C.C.

1997-12-31T23:59:59.000Z

124

(Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)  

SciTech Connect

This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30 percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.

Not Available

1992-04-01T23:59:59.000Z

125

TEX-A-SYST: Reducing the Risk of Ground Water Contamination by Improving Livestock Holding Pen Management  

E-Print Network (OSTI)

Open lots or holding pens for feeding or holding livestock can be sources of ground water contamination. The safety of such operations depends on their separation from water wells, characteristics of the site, and proper management. This publication...

Harris, Bill L.; Hoffman, D.; Mazac Jr., F. J.

1997-08-29T23:59:59.000Z

126

The detection and modelling of surface thermal structures and ground water discharges  

E-Print Network (OSTI)

THE DETECTION AND MODELLING DF SURFACE THERMAL STRUCTURES AND GROUND WATER DISCHARGES A Thesis by DOUGLAS YINCENT ROBERTS Subm1tted to the Graduate Col leqe of Texas A&M University in part1al fulf1llment of the requirements or the degree... of MASTER OF SCIENCE August IgSS Major Subject: Geophys1cs THE DETECTION AND MODELLING OF SURFACE THERMAL STRUCTURES AND GROUND HATER DISCHARGES A Thesis DOUGLAS VINCENT ROBERTS Approved as to style and content by: Earl . oskins (Chair of Committee...

Roberts, Douglas Vincent

2012-06-07T23:59:59.000Z

127

Ground Water Surveillance Monitoring Implementation Guide for Use with DOE O 450.1, Environmental Protection Program  

Directives, Delegations, and Requirements

This Guide assists DOE sites in establishing and maintaining surveillance monitoring programs to detect future impacts on ground water resources from site operations, to track existing ground water contamination, and to assess the potential for exposing the general public to site releases. Canceled by DOE N 251.82.

2004-06-24T23:59:59.000Z

128

TEX-A-SYST: Reducing the Risk of Ground Water Contamination by Improving Household Wastewater Treatment  

E-Print Network (OSTI)

. This publication covers the following topics: 1. Septic tanks/soil absorption systems 2. Quantity of wastewater 3. Quality of wastewater 4. Collection of wastewater 5. Treatment systems 6. Disposal system 7. Assistance with failing systems or new designs 8.... Evaluation table Septic Tanks/Soil Absorption Systems The most common form of on-site waste- water treatment is a septic tank/soil absorption system. In this system, wastewater flows from the household sewage lines into an under- ground septic tank...

Harris, Bill L.; Hoffman, D.; Mazac Jr., F. J.

1997-08-29T23:59:59.000Z

129

TEX-A-SYST: Reducing the Risk of Ground Water Contamination by Improving Hazardous Waste Management  

E-Print Network (OSTI)

or unwanted chemicals can become a big problem. Some common disposal practices not only threaten ground water but also may be illegal. Small, unusable amounts of these products often wind up spilled, buried, dumped, or flushed onto a property. Minimizing... rules require that environmentally protective conditions be met before some disposal practices are permit- ted. Other previously common disposal prac- tices are now illegal because of their potential risks to human health and the environment. This new...

Harris, Bill L.; Hoffman, D.; Mazac Jr., F. J.; Kantor, A. S.

1997-08-29T23:59:59.000Z

130

Ground-water hydrogeology and geochemistry of a reclaimed lignite surface mine  

E-Print Network (OSTI)

that generally parallels the Gulf Coast (Figure 1). Recent estimates place the total near-surface reserves at 11 billion short tons (Kaiser et al. , 1980). Energy companies are now developing lignite mines throughout the Texas lignite belt at a rapid... and accelerating rate. Surface mining of lignite could adversely affect another valuable Texas resource--ground water. Eighty percent of the near-surface lignite reserves are located within the Wilcox Group (Kaiser et al. , 1980), which is part of the Carrizo...

Pollock, Clifford Ralph

2012-06-07T23:59:59.000Z

131

Hydrogeological restrictions to saline ground-water discharge in the Red River of the North drainage basin, North Dakota  

SciTech Connect

Discharge of saline water from bedrock aquifers along the eastern margin of the Williston basin is restricted by surficial glacial till and lacustrine deposits in the Red River of the North drainage basin. Water from these aquifers reaches the surface by (1) diffusion; (2) slow, upward seepage along zones of relatively larger hydraulic conductivity in the till and lacustrine deposits; or (3) flow from artesian wells. Ground-water quality varies near the surface because of mixing of water being discharged from bedrock aquifers with shallower ground water in the surficial deposits. Ground-water quality, hydraulic-gradient, and hydraulic-conductivity data obtained from pumped-well and slug tests indicate that flow in the surficial deposits is eastward, but at slow rates because of small hydraulic conductivities. Base-flow and specific-conductance measurements of water in tributaries to the Red River of the North indicate that focused points of ground-water discharge result in substantial increases in salinity in surface water in the northern part of the basin in North Dakota. Core analyses and drillers' logs were used to generalize hydrogeologic characteristics of the deposits in the basin, and a two-dimensional ground-water-flow model was used to simulate the basin's geohydrologic processes. Model results indicate that the ground-water flow paths in the bedrock aquifers and surficial deposits converge, and that water from the bedrock aquifers contributes to the overall increase in ground-water discharge toward the east. Model results are supported by water-quality data collected along an east-west hydrogeologic section.

Strobel, M.L. (Geological Survey, Grand Forks, ND (United States) Univ. of North Dakota, Grand Forks, ND (United States))

1992-01-01T23:59:59.000Z

132

(Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)  

SciTech Connect

In April 1990, Wright-Patterson Air Force Base (WPAFB), initiated an investigation to evaluate a potential Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action to prevent, to the extent practicable, the offsite migration of contaminated ground water from WPAFB. WPAFB retained the services of the Environmental Management Operations (EMO) and its principle subcontractor, International Technology Corporation (IT) to complete Phase 1 of the environmental investigation of ground-water contamination at WPAFB. Phase 1 of the investigation involves the short-term evaluation and potential design for a program to remove ground-water contamination that appears to be migrating across the western boundary of Area C, and across the northern boundary of Area B along Springfield Pike. Primarily, Task 4 of Phase 1 focuses on collection of information at the Area C and Springfield Pike boundaries of WPAFB. This Sampling and Analysis Plan (SAP) has been prepared to assist in completion of the Task 4 field investigation and is comprised of the Quality Assurance Project Plan (QAPP) and the Field Sampling Plan (FSP).

Not Available

1991-10-01T23:59:59.000Z

133

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

134

Treatment and remediation methods for arsenic removal from the ground water  

Science Journals Connector (OSTI)

Globally, ground water is contaminating by arsenic continously, which needs economic treatment and remediation technologies. Physical, chemical and biological treatment methods have been developed, that include different kinds of filters, bucket type units, fill and draw, kalshi etc. The remediation methods discussed are air oxidation, reactive barriers, utilisation of deeper aquifers and sanitary protected dug wells. To the best of our knowledge no technology is available capable to remove arsenic from water at efficient, economic and commercial levels. Therefore, fast, efficient and economic arsenic removal technologies are required. Attempts have been made to suggest the future technologies of arsenic removal.

Imran Ali; Tabrez A. Khan; Iqbal Hussain

2011-01-01T23:59:59.000Z

135

Ground water monitoring system for effluent irrigated areas : a case study of Hawkesbury water recycling scheme.  

E-Print Network (OSTI)

??Water recycling schemes are increasingly being implemented across Australia as an effective means of converting wastewater into a valuable resource. There is currently a lack… (more)

Beveridge, Gavin John

2006-01-01T23:59:59.000Z

136

Ground Water Protection Programs Implementation Guide for Use with DOE O 450.1, Environmental Protection Program  

Directives, Delegations, and Requirements

This Guide provides a description of the elements of an integrated site-wide ground water protection program that can be adapted to unique physical conditions and programmatic needs at each DOE site. Canceled by DOE N 251.82.

2005-05-05T23:59:59.000Z

137

Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1  

SciTech Connect

This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

Not Available

1994-08-01T23:59:59.000Z

138

Remediation of ground water containing chlorinated and brominated hydrocarbons, benzene and chromate by sequential treatment using ZVI and GAC  

Science Journals Connector (OSTI)

A laboratory experiment with two sequenced columns was performed as a preliminary study for the installation of a permeable reactive barrier (PRB) at a site where a mixed ground water contamination exists. The...

Volkmar Plagentz; Markus Ebert; Andreas Dahmke

2006-03-01T23:59:59.000Z

139

TEX-A-SYST: Reducing the Risk of Ground Water Contamination by Improving Livestock Manure Storage and Treatment Facilities  

E-Print Network (OSTI)

Improperly managed manure can contaminate both ground and surface water. Storing manure allows producers to spread it when crops can best use the nutrients. This publication explains safe methods of manure storage, as well as specifics about safe...

Harris, Bill L.; Hoffman, D.; Mazac Jr., F. J.

1997-08-29T23:59:59.000Z

140

Geohydrology and ground-water geochemistry at a sub-Arctic Landfill, Fairbanks, Alaska. Water resources investigation  

SciTech Connect

The Fairbanks-North Star Borough landfill is located on silt, sand, and gravel deposits of the Tanana River flood plain, about 3 miles south of the city of Fairbanks water-supply wells. The landfill has been in operation for about 25 years in this sub-arctic region of discontinuous permafrost. The cold climate limits biological activity within the landfill with corresponding low gas and leachate production. Chloride concentrations, specific conductance, water temperatures, and earth conductivity measurements indicate a small plume of leachate flowing to the northwest from the landfill. The leachate remains near the water table as it flows northwestward toward a drainage ditch. Results of computer modeling of this local hydrologic system indicate that some of the leachate may be discharging to the ditch. Chemical data show that higher-than-background concentrations of several ions are present in the plume. However, the concentrations appear to be reduced to background levels within a short distance along the path of ground-water flow from the landfill, and thus the leachate is not expected to affect the water-supply wells.

Downey, J.S.; Sinton, P.O.

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Applicability of Related Data, Algorithms, and Models to the Simulation of Ground-Coupled Residential Hot Water Piping in California  

SciTech Connect

Residential water heating is an important consideration in California?s building energy efficiency standard. Explicit treatment of ground-coupled hot water piping is one of several planned improvements to the standard. The properties of water, piping, insulation, backfill materials, concrete slabs, and soil, their interactions, and their variations with temperature and over time are important considerations in the required supporting analysis. Heat transfer algorithms and models devised for generalized, hot water distribution system, ground-source heat pump and ground heat exchanger, nuclear waste repository, buried oil pipeline, and underground electricity transmission cable applications can be adapted to the simulation of under-slab water piping. A numerical model that permits detailed examination of and broad variations in many inputs while employing a technique to conserve computer run time is recommended.

Warner, J.L.; Lutz, J.D.

2006-01-01T23:59:59.000Z

142

2014-12-22 Issuance: Alternative Efficiency Determination Methods, Basic Model Definition, and Compliance for Commercial HVAC, Refrigeration, and Water Heating Equipment; Final Rule  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register final rule regarding alternative efficiency determination methods, basic model definition, and compliance for commercial HVAC, refrigeration, and water heating equipment , as issued by the Deputy Assistant Secretary for Energy Efficiency on December 22, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

143

Behavior of partially miscible organic compounds in simulated ground water systems  

SciTech Connect

Serious ground water contamination problems result from leaks or spills of organic liquids which are partially miscible in water. Two important categories of these liquids include low molecular weight chlorinated solvents and gasoline. 1,1,1-Trichloroethane (TCA) abiotically degrades in water forming approximately 17-25% 1,1-dichloroethene (1,1-DCE) via an elimination reaction. Brominated analogs of TCA hydrolyze 11-13 times faster than TCA. As the number of bromines increase, the percent of elimination products increases. These geminal trihalides degrade by a unimolecular mechanism (E1/SN1). The rate coefficient for TCA degradation in buffered water at elevated temperature is approximately six times greater than hydrolysis of 1-chloropropane (SN2 mechanism) and more than 100 times greater than 1,1-dichloroethane. In the presence of sodium thiosulfate, the 1-chloropropane degradation rate increased by more than a factor of 100, 1,1-dichloroethane rate by 22 and TCA degradation by approximately two. The range of concentrations for major components of gasoline which partition into water was determined for 65 gasoline samples. Benzene concentrations in the water extracts ranged from 12.3-130 mg/l and toluene concentrations ranged from 23-185 mg/l. Fuel/water partition coefficients of seven major aromatic constituents were measured for 31 gasoline types and showed a standard deviation of 10-30%. These coefficients were highly correlated with the pure component solubilities. Chemometric techniques were applied to 20 peaks measured in the aqueous extracts of the 65 gasolines. Bivariate plots and principal component analyses show selected brands have distinguishing equilibrium concentrations, but complete separation of brands was not observed.

Cline, P.V.

1988-01-01T23:59:59.000Z

144

Compliance, Certification and Enforcement for US Appliance and Equipment Energy Efficiency Programs by US DOE  

Office of Energy Efficiency and Renewable Energy (EERE)

Information about energy and water conservation standards, ENERGY STAR, and compliance and certification enforcement.

145

Computer simulation models relevant to ground water contamination from EOR or other fluids - state-of-the-art  

SciTech Connect

Ground water contamination is a serious national problem. The use of computers to simulate the behavior of fluids in the subsurface has proliferated extensively over the last decade. Numerical models are being used to solve water supply problems, various kinds of enertgy production problems, and ground water contamination problems. Modeling techniques have progressed to the point that their accuracy is only limited by the modeller's ability to describe the reservoir in question and the heterogeneities therein. Pursuant to the Task and Milestone Update of Project BE3A, this report summarizes the state of the art of computer simulation models relevant to contamination of ground water by enhanced oil recovery (EOR) chemicals and/or waste fluids. 150 refs., 6 tabs.

Kayser, M.B.; Collins, A.G.

1986-03-01T23:59:59.000Z

146

Exergy and Energy analysis of a ground-source heat pump for domestic water heating under simulated occupancy conditions  

SciTech Connect

This paper presents detailed analysis of a water to water ground source heat pump (WW-GSHP) to provide all the hot water needs in a 345 m2 house located in DOE climate zone 4 (mixed-humid). The protocol for hot water use is based on the Building America Research Benchmark Definition (Hendron 2008; Hendron and Engebrecht 2010) which aims to capture the living habits of the average American household and its impact on energy consumption. The entire house was operated under simulated occupancy conditions. Detailed energy and exergy analysis provides a complete set of information on system efficiency and sources of irreversibility, the main cause of wasted energy. The WW-GSHP was sized at 5.275 kW (1.5-ton) for this house and supplied hot water to a 303 L (80 gal) water storage tank. The WW-GSHP shared the same ground loop with a 7.56 kW (2.1-ton) water to air ground source heat pump (WA-GSHP) which provided space conditioning needs to the entire house. Data, analyses, and measures of performance for the WW-GSHP in this paper complements the results of the WA-GSHP published in this journal (Ally, Munk et al. 2012). Understanding the performance of GSHPs is vital if the ground is to be used as a viable renewable energy resource.

Ally, Moonis Raza [ORNL; Munk, Jeffrey D [ORNL; Baxter, Van D [ORNL; Gehl, Anthony C [ORNL

2012-01-01T23:59:59.000Z

147

Regulatory Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Compliance Regulatory Compliance Regulatory Compliance This photo shows the inside the K West Basin facility, where workers are retrieving highly radioactive sludge material under 17 feet of water. This photo shows the inside the K West Basin facility, where workers are retrieving highly radioactive sludge material under 17 feet of water. The Department of Energy is not a regulatory agency; however it does self-regulate its own radioactive waste. DOE is also affected by a variety of statutes, legislation, regulations, directives and guidance. Many of the current compliance-related actions revolve around waste and material disposition. These include National Environmental Policy Act (NEPA) Environmental Impact Statements and Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Records of Decision. Links, below,

148

BASELINE RISK ASSESSMENT OF GROUND WATER CONTAMINATION AT THE URAN~UM MILL TAILINGS  

Office of Legacy Management (LM)

I~:-:ii*.i: i,<;.;.-;_r- --:-:ir-- I~:-:ii*.i: i,<;.;.-;_r- --:-:ir-- - . . - -. . - . . - , -, . , , , - - - - . BASELINE RISK ASSESSMENT OF GROUND WATER CONTAMINATION AT THE URAN~UM MILL TAILINGS SITE NEAR RIVERTON, WYOMING I i I I I Prepared by the U.S. Department of Energy Albuquerque, New Mexico September 1995 INTENDED FOR PUBLIC RELEASE This report has been reproduced from the best available copy. Avai and microfiche Number of pages in this report: 166 DOE and DOE contractors can obtain copies of this report from: Office of Scientific and Technical information P.O. Box 62 Oak Ridge, TN 37831 (61 5) 576-8401 This report is publicly available from: National Technical information Service Department of Commerce 5285 Port Royal Road Springfield, VA 22161 (703) 487-4650 DOEIAL162350-65

149

New route for degradation of chlorinated ethylenes in exhaust gases from ground water remediation  

Science Journals Connector (OSTI)

On the basis of an approximate finite-size description, a UV photoreactor was devised and constructed for studying the photooxidation of the chlorinated ethylenes perchloroethylene (PCE), trichloroethylene (TCE), 1,2-dichloroethylenes (DCE), vinyl chloride (VC) and several saturated chlorinated hydrocarbons (CHC). In the cases of PCE and TCE, the efficiency of the photooxidation using irradiation by a 222 nm excimer lamp and subsequent photolysis for the initiation of the process was found to be sufficiently high so that a scaling up to an industrial purification plant of exhaust gases from ground water remediation can be hopefully envisaged. Thanks to consecutive reactions with the chain-sustaining chlorine atoms, this degradation route proves capable of decomposing the other chlorinated ethylenes which are not amenable to photolysis in a direct way. For saturated CHC the utilisability of this approach is limited.

Lutz Prager; Eberhard Hartmann

2001-01-01T23:59:59.000Z

150

Stable isotopes of hydrogen and oxygen in surface water and ground water at selected sites on or near the Idaho National Engineering Laboratory, Idaho  

SciTech Connect

Relative stable isotopic ratios for hydrogen and oxygen compared to standard mean ocean water are presented for water from 4 surface-water sites and 38 ground-water sites on or near the Idaho National Engineering Laboratory (INEL). The surface-water samples were collected monthly from March 1991 through April 1992 and after a storm event on June 18, 1992. The ground-water samples either were collected during 1991 or 1992. These data were collected as part of the US Geological Survey`s continuing hydrogeological investigations at the INEL. The relative isotopic ratios of hydrogen and oxygen are reported as delta {sup 2}H ({delta}{sup 2}H) and as delta {sup 18}O ({delta}{sup 18}O), respectively. The values of {delta}{sup 2}H and {delta}{sup 18}O in water from the four surface-water sites ranged from -143.0 to -122 and from -18.75 to -15.55, respectively. The values of {delta}{sup 2}H and {delta}{sup 18}O in water from the 38 ground-water sites ranged from -141.0 to -120.0 and from -18.55 to -14.95, respectively.

Ott, D.S.; Cecil, L.D.; Knobel, L.L.

1994-11-01T23:59:59.000Z

151

Fracture-zone dewatering to control ground water inflow in underground coal mines. Report of Investigations/1985  

SciTech Connect

The Bureau of Mines investigation focuses on the identification and control of ground-water inflow problems that occur in the active sections of underground Appalachian coal mines. A fracture inflow survey of eight underground mines was conducted. Three types of mine fracture intercepts were identified, which are typical of wet section mining conditions. A mine in Preston County, WV was selected as the site for a fracture-zone dewatering experiment. Fracture trace analysis was used to site dewatering wells in a fracture valley setting ahead of mine development. The design, implementation, and results of the dewatering experiment are presented. The investigation suggests that fracture zones are responsible for the sudden release of stored ground water, which often occurs as mining sections advance beneath fracture valley topography. It is concluded, therefore, that dewatering operations that are designed to intercept the component of ground water that is stored in fracture zones will be most effective in controlling infiltration to active mine sections.

Schmidt, R.D.

1985-01-01T23:59:59.000Z

152

Compliance Certification Enforcement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Certification Enforcement Compliance Certification Enforcement Compliance Certification Enforcement DOE enforces the energy and water conservation regulations established by the Office of Energy Efficiency and Renewable Energy, Appliance Standards Program to ensure that residential, commercial and industrial equipment deliver the energy and cost savings required by law. To ensure that all covered products comply with the energy and water conservation standards, the enforcement office reviews manufacturers' compliance with certification requirements. Products covered under the Energy Policy and Conservation Act of 1975, as amended, are required annually to ''certify by means of a certification report that each basic model(s) meets the applicable energy conservation standard." This program

153

ENVIRONMENTAL COMPLIANCE SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS  

E-Print Network (OSTI)

· Environmental Database Development and Management · Storm Water Modeling #12;ENVIRONMENTAL COMPLIANCE SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML of environmental managers. The Center provides assistance to environmental managers in compliance areas such as air

154

A cost-effective, environmentally-responsive ground-water monitoring procedure  

E-Print Network (OSTI)

allows the optimization loop to modify the system for greater efficiency. The value of this procedure was tested at selected sites in the Gibbons Creek Lignite Mine in Grimes County, Texas. The mine, which is currently in compliance with state regulations...

Doucette, Richard Charles

1994-01-01T23:59:59.000Z

155

Atmospheric bromine flux from the coastal Abu Dhabi sabkhat: A ground-water mass-balance investigation  

E-Print Network (OSTI)

2007; published 31 July 2007. [1] A solute mass-balance study of ground water of the 3000 km2 coastal area of active salt flats then it is a significant, and generally under recognized, input to the global., 2000; Keppler et al., 2000]. More relevant to this study area are reports in which bromide appears

156

RCRA (Resource Conservation and Recovery Act) ground-water monitoring projects for Hanford facilities: Annual Progress Report for 1989  

SciTech Connect

This report describes the progress during 1989 of 16 Hanford Site ground-water monitoring projects covering 25 hazardous waste facilities and 1 nonhazardous waste facility. Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act of 1976 and the State of Washington Administrative Code. 40 refs., 75 figs., 6 tabs.

Smith, R.M.; Gorst, W.R. (eds.)

1990-03-01T23:59:59.000Z

157

[Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design  

SciTech Connect

This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30 percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.

Not Available

1992-04-01T23:59:59.000Z

158

Micro-purge low-flow sampling of uranium-contaminated ground water at the Fernald Environmental Management Project  

SciTech Connect

Efforts to sample representative, undisturbed distributions of uranium in ground water beneath the Fernald Environmental Management Project (FEMP) prompted the application of a novel technique that is less invasive in the monitoring well. Recent studies indicate that representative samples can and should be collected without prior well volume exchange purging or borehole evacuation. Field experiments conducted at the FEMP demonstrate that under specific sampling conditions in a well-defined hydrogeologic system, representative ground water samples for a monitoring program can be obtained without removing the conventional three well volumes from the well. The assumption is made that indicator parameter equilibration may not be necessary to determine when to collect representative samples at the FEMP. Preliminary results obtained form the field experiments suggest that this may be true. The technique employs low purge rates (< 1 L/min) with dedicated bladder pumps with inlets located in the screened interval of the well, while not disturbing the stagnant water column above the screened interval. If adopted, this technique, termed micro-purge low-flow sampling, will produce representative ground water samples significantly reduce sampling costs, and minimize waste water over the monitoring life cycle at the FEMP. This technique is well suited for sites that have been fully characterized and are undergoing long-term monitoring.

Shanklin, D.E. Sidle, W.C.; Ferguson, M.E.

1995-10-01T23:59:59.000Z

159

The influence of fracture properties on ground-water flow at the Bunker Hill Mine, Kellogg, Idaho  

SciTech Connect

The Bunker Hill Mine in northern Idaho is a large underground lead-zinc mine located in Precambrian metaquartzite rocks with virtually no primary porosity. Ground-water flow through these types of rocks is largely dependent upon the properties of fractures such as joints, faults and relict bedding planes. Ground water that flows into the mine via the fractures is contaminated by heavy metals and by the production of acid water, which results in a severe acid mine drainage problem. A more complete understanding of how the fractures influence the ground-water flow system is a prerequisite to the evaluation of reclamation alternatives to reduce acid drainage from the mine. Fracture mapping techniques were used to obtain detailed information on the fracture properties observed in the New East Reed drift of the Bunker Hill Mine. The data obtained include: (a) fracture type, (b) orientation, (c) trace length, (d) the number of visible terminations, (e) roughness (small-scale asperities), (f) waviness (larger-scale undulations), (g) infilling material, and (h) a qualitative measure of the amount of water flowing through each fracture.

Lachmar, T.E. [Utah State Univ., Logan, UT (United States). Dept. of Geology

1993-12-01T23:59:59.000Z

160

Effects of agrochemical use in agricultural activities on the drinking water quality of ground and surface water: a case study of Agogo in the Asanti-Akim North District.  

E-Print Network (OSTI)

??The effects of agrochemical use in agricultural activities on the quality of ground and surface water within Agogo, a prominent tomato growing area in the… (more)

Adonadaga, Melvin-Guy

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ -o ~ ~ -o Project lnfonnation Project Title: Replace Down Guy Rod 24~3 Date: 11/30/09 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview Replace Down Guy Rod Emergency The pole was ready to Break Wire 5' above the ground 1. What are the environmental impacts? 24-SHX-3 2. What is the legal location? 3. What is the duration of the project? 5 hr 4. What major equipment will be used if any (work over rig, drilling rig, etc,)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTe If Change of Scope oe~. Project Lead must sutlmft a new NEPA ColT pll~ Sunley and c ontact the T echnical Assurance Department. Impacts If YES, then complete below

162

The relationship of the Yucca Mountain repository block to the regional ground-water system: A geochemical model  

SciTech Connect

Yucca Mountain, in southern Nevada, is being studied by the Department of Energy and the State of Nevada as the site of a high-level nuclear waste repository. Geochemical and isotopic modeling were used in this study to define the relationship of the volcanic tuff aquifers and aquitards to the underlying regional carbonate ground-water system. The chemical evolution of a ground water as it passes through a hypothetical tuffaceous aquifer was developed using computer models PHREEQE, WATEQDR and BALANCE. The tuffaceous system was divided into five parts, with specific mineralogies, reaction steps and temperatures. The initial solution was an analysis of a soil water from Rainier Mesa. The ending solution in each part became the initial solution in the next part. Minerals consisted of zeolites, smectites, authigenic feldspars and quartz polymorphs from described diagentic mineral zones. Reaction steps were ion exchange with zeolites. The solution from the final zone, Part V, was chosen as most representative, in terms of pH, element molalities and mineral solubilities, of tuffaceous water. This hypothetical volcanic water from Part V was mixed with water from the regional carbonate aquifer, and the results compared to analyses of Yucca Mountain wells. Mixing and modeling attempts were conducted on wells in which studies indicated upward flow.

Matuska, N.A.; Hess, J.W. [Nevada Univ., Reno, NV (United States). Water Resources Center

1989-08-01T23:59:59.000Z

163

Three-dimensional coupled ground water flow, thermal transport and/or migration of nuclides analysis by boundary element method  

SciTech Connect

In the safety analyses of radioactive waste disposal, it is important and indispensable to analyze coupled problems of ground water flow, thermal transport and/or migration of nuclides. The three-dimensional coupled problems is solved by boundary element method in this paper. The results of this method are compared with those experiments of JAERI and STRIPA SWEDEN on the thermal problem, and with those analyses of analytical and FEM results on the migration problem. In this formulation, natural convection is considered by Boussinesq approximation. An example of coupled ground water flow and migration of nuclides with decay chain U{sup 234} {yields} Th{sup 230} {yields} Ra{sup 226} is also tried.

Kawamura, Ryuji [Information and Mathematical Science Lab., Inc., Kanagawa (Japan)

1994-12-31T23:59:59.000Z

164

Summary of hydrogeologic controls on ground-water flow at the Nevada Test Site, Nye County, Nevada  

SciTech Connect

The underground testing of nuclear devices has generated substantial volumes of radioactive and other chemical contaminants below ground at the Nevada Test Site (NTS). Many of the more radioactive contaminants are highly toxic and are known to persist in the environment for thousands of years. In response to concerns about potential health hazards, the US Department of Energy, under its Environmental Restoration Program, has made NTS the subject of a long-term investigation. Efforts will assess whether byproducts of underground testing pose a potential hazard to the health and safety of the public and, if necessary, will evaluate and implement steps to remediate any of the identified dangers. Ground-water flow is the primary mechanism by which contaminants can be transported significant distances away from the initial point of injection. Flow paths between contaminant sources and potential receptors are separated by remote areas that span tens of miles. The diversity and structural complexity of the rocks along these flow paths complicates the hydrology of the region. Although the hydrology has been studied in some detail, much still remains uncertain about flow rates and directions through the fractured-rock aquifers that transmit water great distances across this arid region. Unique to the hydrology of NTS are the effects of underground testing, which severely alter local rock characteristics and affect hydrologic conditions throughout the region. This report summarizes what is known and inferred about ground-water flow throughout the NTS region. The report identifies and updates what is known about some of the major controls on ground-water flow, highlights some of the uncertainties in the current understanding, and prioritizes some of the technical needs as related to the Environmental Restoration Program. 113 refs.

Laczniak, R.J.; Cole, J.C.; Sawyer, D.A.; Trudeau, D.A.

1996-07-01T23:59:59.000Z

165

Measured Space Conditioning and Water Heating Performance of a Ground-Source Integrated Heat Pump in a Residential Application  

SciTech Connect

In an effort to reduce residential building energy consumption, a ground-source integrated heat pump was developed to meet a home s entire space conditioning and water heating needs, while providing 50% energy savings relative to a baseline suite of minimum efficiency equipment. A prototype 7.0 kW system was installed in a 344 m2 research house with simulated occupancy in Oak Ridge, TN. The equipment was monitored from June 2012 through January 2013.

Munk, Jeffrey D [ORNL] [ORNL; Ally, Moonis Raza [ORNL] [ORNL; Baxter, Van D [ORNL] [ORNL; Gehl, Anthony C [ORNL] [ORNL

2014-01-01T23:59:59.000Z

166

Bordering on Water Management: Ground and Wastewater in the United States - Mexico Transboundary Santa Cruz Basin  

E-Print Network (OSTI)

Environmental Board (2005). Water Resources Management onEnvironmental Valuation and Its Economic Critics. Journal of Water Resources Planning and Management,Environmental Cooperation Commission, has encouraged unilateral decision making, as water management

Milman, Anita Dale

2009-01-01T23:59:59.000Z

167

Lessons from practice in the assessment and remediation of contaminated ground water  

Science Journals Connector (OSTI)

The famous American humorist Mark Twain once wrote “don’t let school interfere with your education”. This paper builds on this theme by examining important lessons that come from work on practical problems of ground

Franklin W. Schwartz; Eung Seok Lee; Yongje Kim

2008-06-01T23:59:59.000Z

168

Ground-water levels and tritium concentrations at the Maxey Flats low-level radioactive-waste-disposal site near Morehead, Kentucky, June 1984 to April 1989. Water - resources investigation  

SciTech Connect

The report, one in a series of reports by the USGS, summarizes ground-water level and tritium data that were collected by the USGS from June 1984 through April 1989. The report also describes the occurrence and distribution of tritium in water from selected wells. Data for ground-water levels in wells and disposal tranches and the concentrations of tritium in water from monitoring wells at the site are presented. Precipitation data were collected in conjunction with the water-level data to relate precipitation to ground-water recharge. Specific conductance data, routinely determined for ground-water samples, also were collected to compare changes in specific conductance to changes in tritium concentrations. All data are stored locally on the U.S. Geological Survey's National Water Information System (NWIS).

Wilson, K.S.; Lyons, B.E.

1991-01-01T23:59:59.000Z

169

Biogeochemical Processes Responsible for the Enhanced Transport of Plutonium Under transient Unsaturated Ground Water Conditions  

SciTech Connect

To better understand longer-term vadose zone transport in southeastern soils, field lysimeter experiments were conducted at the Savannah River Site (SRS) near Aiken, SC, in the 1980s. Each of the three lysimeters analyzed herein contained a filter paper spiked with different Pu solutions, and they were left exposed to natural environmental conditions (including the growth of annual weed grasses) for 11 years. The resulting Pu activity measurements from each lysimeter core showed anomalous activity distributions below the source, with significant migration of Pu above the source. Such results are not explainable by adsorption phenomena alone. A transient variably saturated flow model with root water uptake was developed and coupled to a soil reactive transport model. Somewhat surprisingly, the fully transient analysis showed results nearly identical to those of a much simpler steady flow analysis performed previously. However, all phenomena studied were unable to produce the upward Pu transport observed in the data. This result suggests another transport mechanism such as Pu uptake by roots and upward transport due to transpiration. Thus, the variably saturated flow and reactive transport model was extended to include uptake and transport of Pu within the root xylem, along with computational methodology and results. In the extended model, flow velocity in the soil was driven by precipitation input along with transpiration and drainage. Water uptake by the roots determined the flow velocity in the root xylem, and this along with uptake of Pu in the transpiration stream drove advection and dispersion of the two Pu species in the xylem. During wet periods with high potential evapotranspiration, maximum flow velocities through the xylem would approached 600 cm/hr, orders of magnitude larger that flow velocities in the soil. Values for parameters and the correct conceptual viewpoint for Pu transport in plant xylem was uncertain. This motivated further experiments devoted to Pu uptake by corn roots and xylem transport. Plants were started in wet paper wrapped around each corn seed. When the tap roots were sufficiently long, the seedlings were transplanted to a soil container with the tap root extending out the container bottom. The soil container was then placed over a nutrient solution container, and the solution served as an additional medium for root growth. To conduct an uptake study, a radioactive substance, such as Pu complexed with the bacterial siderophore DFOB, was added to the nutrient solution. After a suitable elapsed time, the corn plant was sacrificed, cut into 10 cm lengths, and the activity distribution measured. Experimental results clarified the basic nature of Pu uptake and transport in corn plants, and resulting simulations suggested that each growing season Pu in the SRS lysimeters would move into the plant shoots and be deposited on the soil surface during the Fall dieback. Subsequent isotope ratio analyses showed that this did happen. OVERALL RESULTS AND CONCLUSIONS - (1) Pu transport downward from the source is controlled by advection, dispersion and adsorption, along with surface-mediated REDOX reactions. (2) Hysteresis, extreme root distribution functions, air-content dependent oxidation rate constants, and large evaporation rates from the soil surface were not able to explain the observed upward migration of Pu. (3) Small amounts of Pu uptake by plant roots and translocation in the transpiration stream creates a realistic mechanism for upward Pu migration (4) Realistic xylem cross-sectional areas imply high flow velocities under hot, wet conditions. Such flow velocities produce the correct shape for the observed activity distributions in the top 20 cm of the lysimeter soil. (5) Simulations imply that Pu should have moved into the above-ground grass tissue each year during the duration of the experiments, resulting in an activity residual accumulating on the soil surface. An isotope ratio analysis showed that the observed surface Pu residue was from the buried sources, not atmospheric fallout. (6) The

Fred J. Molz, III

2010-05-28T23:59:59.000Z

170

Chlorofluorocarbons, Sulfur Hexafluoride, and Dissolved Permanent Gases in Ground Water from Selected Sites In and Near the Idaho National Engineering and Environmental Laboratory, Idaho, 1994 - 1997  

SciTech Connect

From July 1994 through May 1997, the U.S. Geological Survey, in cooperations with the Department of Energy, sampled 86 wells completed in the Snake River Plain aquifer at and near the Idaho National Engineering and Environmental Laboratory (INEEL). The wells were sampled for a variety of constituents including one- and two-carbon halocarbons. Concentrations of dichlorodifluoromethane (CFC-12), trichlorofluoromethane (CFC-11), and trichlorotrifluororoethane (CFC-113) were determined. The data will be used to evaluate the ages of ground waters at INEEL. The ages of the ground water will be used to determine recharge rates, residence time, and travel time of water in the Snake River Plain aquifer in and near INEEL. The chromatograms of 139 ground waters are presented showing a large number of halomethanes, haloethanes, and haloethenes present in the ground waters underlying the INEEL. The chromatograms can be used to qualitatively evaluate a large number of contaminants at parts per trillion to parts per billion concentrations. The data can be used to study temporal and spatial distribution of contaminants in the Snake River Plain aquifer. Representative compressed chromatograms for all ground waters sampled in this study are available on two 3.5-inch high density computer disks. The data and the program required to decompress the data can be obtained from the U.S. Geological Survey office at Idaho Falls, Idaho. Sulfur hexafluoride (SF6) concentrations were measured in selected wells to determine the feasibility of using this environmental tracer as an age dating tool of ground water. Concentrations of dissolved nitrogen, argon, carbon dioxide, oxygen, and methane were measured in 79 ground waters. Concentrations of dissolved permanent gases are tabulated and will be used to evaluate the temperature of recharge of ground water in and near the INEEL.

Busenberg, E.; Plummer, L.N.; Bartholomay, R.C.; Wayland, J.E.

1998-08-01T23:59:59.000Z

171

Survey of blasting effects on ground water supplies in Appalachia. Part 2. Open file report, August 1980-August 1982  

SciTech Connect

This report covers an 18-month study of the performance of a 300-ft-deep test water well located at the Ayrshire Mine of the AMAX Coal Co. near Evansville, IN. Well performance, as characterized by 10-hr drawdown tests, was monitored as the strip mining operation approached the well site from distances of 2,000 to 15 ft (overburden removal). Blast-induced ground motion was measured at the surface next to the test well, and peak particle velocities in excess of 4 in/s were obtained. No evidence of changes in water quantity or quality could be directly attributed to the blasts. However, some lowering of the static water level in the observation well, and a simultaneous increase in the adjusted specific capacity of the test well, suggest that overburden removal caused lateral stress relief with consequent opening of vertical fractures.

Berger, P.R.; Froedge, D.T.; Gould, J.A.; Kreps, L.F.

1982-08-01T23:59:59.000Z

172

Compliance Order on Consent  

NLE Websites -- All DOE Office Websites (Extended Search)

Laws » Laws » Compliance Order on Consent Compliance Order on Consent The Compliance Order on Consent provides the requirements for environmental cleanup of hazardous constituents for LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email What is the Compliance Order on Consent? The Compliance Order on Consent between the State of New Mexico Environment Department and the United States Department of Energy and Los Alamos National Laboratory provides for specified compliance requirements for all of the solid waste management units, areas of concern, canyons, and watershed aggregates included in the Order. Compliance Order on Consent documents LANL documents submitted under the Compliance Order on Consent are

173

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA COMPLIANCE SURVEY NEPA COMPLIANCE SURVEY # 350 8 Revised 8/2/10 mjt Attachment 1 Written by Dan Smallwood Production Enhancement Project-5 T-2-34 to T-1-33 MIT all wells in this area to determine which are producing wells. There are 15 wells shut in this area because of no tank or shipping line. According to the old test sheet these wells make 24bbls oil and 120bbls of water. Two of these wells have leaks in the flow lines that will be fixed. One is 33-S-34 which could be run to 34-AX-34, about 400' .6 bbl/pd and the other is 35 shx 34 which could be run to 35-AX-34 which is about 200'.5bbl/pd. 42-AX-34 could be ran to 32-AX-34 and then to 33-SX-34 to 34-AX-34. There are two manifolds at T-2-34, one with 10 wells and the other with 12. None of the flow lines have valves or checks in the lines. I propose we flush, disconnect, and plug all wells that

174

On the challenges of tomography retrievals of a 2D water vapor field using ground-based microwave radiometers: An observation system simulation experiment  

Science Journals Connector (OSTI)

Two-dimensional water vapor fields were retrieved by simulated measurements from multiple ground-based microwave radiometers using a tomographic approach. The goal of this paper was to investigate how the various aspects of the instrument set-up (...

Véronique Meunier; David D. Turner; Pavlos Kollias

175

Alabama Compliance Implementation  

NLE Websites -- All DOE Office Websites (Extended Search)

Alabama Alabama Compliance Implementation and Evaluation (CIE) Guide BUILDING TECHNOLOGIES PROGRAM COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 2 This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings. COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 3 Alabama WHAT'S INSIDE CIE Guide Overview-Flow Diagram ........................................................................................................................... 5 PART 1: Guide Overview .................................................................................................................................................

176

Ground water of Yucca Mountain: How high can it rise?; Final report  

SciTech Connect

This report describes the geology, hydrology, and possible rise of the water tables at Yucca Mountain. The possibilities of rainfall and earthquakes causing flooding is discussed.

NONE

1992-12-31T23:59:59.000Z

177

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 81 Project lnfonnation Project Title: CBM Gas Separator Date: 2-23-2010 DOE Code: 6720-020-51131 Contractor Code: Project Lead: Mark Duletsky Project Overview None anticipated, uses producing well on pre-existing location. 1. What are the environmental impacts? 48-2-X-28 Location, 447' FSL. 2495 FWL, SE, SW, Sec. 28, T39N, R78W, Natrona County. Wyoming USA 2. Wnat is the legal location? 3. What is the duration of the project? 5days 4. What major equipment will be used if any (work over rig, drilling rig, Forkfift. winch truck. water truck etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Special ist and the DOE NEPA Compliance Officer. NO'TE: H Change of Scope occurs, Proj ect Lead m u st $ubmlt a new NEPA Compllance Suntey and

178

High-Resolution Estimation of Near-Subsurface Water Content using Surface GPR Ground Wave Information  

E-Print Network (OSTI)

-scarce agricultural areas. Conventional measurements of water content (such as from time domain reflectometry [TDR], neutron probe or gravimetric techniques) are intrusive and provide information at a 'point' scale, which

Rubin, Yoram

179

A Transient Numerical Simulation of Perched Ground-Water Flow at the Test Reactor Area, Idaho National Engineering and Environmental Laboratory, Idaho, 1952-94  

SciTech Connect

Studies of flow through the unsaturated zone and perched ground-water zones above the Snake River Plain aquifer are part of the overall assessment of ground-water flow and determination of the fate and transport of contaminants in the subsurface at the Idaho National Engineering and Environmental Laboratory (INEEL). These studies include definition of the hydrologic controls on the formation of perched ground-water zones and description of the transport and fate of wastewater constituents as they moved through the unsaturated zone. The definition of hydrologic controls requires stratigraphic correlation of basalt flows and sedimentary interbeds within the saturated zone, analysis of hydraulic properties of unsaturated-zone rocks, numerical modeling of the formation of perched ground-water zones, and batch and column experiments to determine rock-water geochemical processes. This report describes the development of a transient numerical simulation that was used to evaluate a conceptual model of flow through perched ground-water zones beneath wastewater infiltration ponds at the Test Reactor Area (TRA).

B. R. Orr (USGS)

1999-11-01T23:59:59.000Z

180

Heating and cooling of municipal buildings with waste heat from ground water  

SciTech Connect

The feasibility of using waste heat from municipal water wells to replace natural gas for heating of the City Hall, Fire Station, and Community Hall in Wilmer, Texas was studied. At present, the 120/sup 0/F well water is cooled by dissipating the excess heat through evaporative cooling towers before entering the distribution system. The objective of the study was to determine the pumping cycle of the well and determine the amount of available heat from the water for a specified period. This data were correlated with the heating and cooling demand of the City's buildings, and a conceptual heat recovery system will be prepared. The system will use part or all of the excess heat from the water to heat the buildings, thereby eliminating the use of natural gas. The proposed geothermal retrofit of the existing natural gas heating system is not economical because the savings in natural gas does not offset the capital cost of the new equipment and the annual operating and maintenance costs. The fuel savings and power costs are a virtual trade-off over the 25-year period. The installation and operation of the system was estimated to cost $105,000 for 25 years which is an unamortized expense. In conclusion, retrofitting the City of Wilmer's municipal buildings is not feasible based on the economic analysis and fiscal projections as presented.

Morgan, D.S.; Hochgraf, J.

1980-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Pesticide Levels in Ground and Surface Waters of Primavera do Leste Region, Mato Grosso, Brazil  

Science Journals Connector (OSTI)

......monoculture plantations, whose production has expanded greatly...and tends to sorb to organic matter from soil, it...reported as cells for minimum values means...by volatiliza- tion. Solar radiation also intensely...pesticides and other organic pollutants in river water......

Eliana F.G.C. Dores; Leandro Carbo; Maria L. Ribeiro; Ermelinda M. De-Lamonica-Freire

2008-08-01T23:59:59.000Z

182

Ground-water characterization field activities for 1995--1996 Laboratory for Energy-Related Health Research, University of California, Davis  

SciTech Connect

This report documents ground-water characterization field activities completed from August to December 1995 and in January 1996 at the Laboratory for Energy-Related Health Research (LEHR) in Davis, California. The ground water at LEHR is one of several operable units under investigation by Pacific Northwest National Laboratory for the US Department of Energy. The purpose of this work was to further characterize the hydrogeology beneath the LEHR site, with the primary focus on ground water. The objectives were to estimate hydraulic properties for the two uppermost saturated hydrogeologic units (i.e., HSU-1 and HSU-2), and to determine distributions of contaminants of concern in these units. Activities undertaken to accomplish these objectives include well installation, geophysical logging, well development, ground-water sampling, slug testing, Westbay ground-water monitoring system installation, continuous water-level monitoring, Hydropunch installation, and surveying. Ground-water samples were collected from 61 Hydropunch locations. Analytical results from these locations and the wells indicate high chloroform concentrations trending from west/southwest to east/northeast in the lower portion of HSU-1 and in the upper and middle portions of HSU-2. The chloroform appears to originate near Landfill 2. Tritium was not found above the MCL in any of the well or Hydropunch samples. Hexavalent chromium was found at four locations with concentrations above the MCL in HSU-1 and at one location in HSU-2. One well in HSU-1 had a total chromium concentration above the MCL. Nitrate-nitrogen above the MCL was found at several Hydropunch locations in both HSU-1 and HSU-2.

Liikala, T.L.; Lanigan, D.C.; Last, G.V. [and others

1996-05-01T23:59:59.000Z

183

Assessment of precipitable water vapor derived from ground-based BeiDou observations with Precise Point Positioning approach  

Science Journals Connector (OSTI)

Abstract Precipitable water vapor (PWV) estimation from Global Positioning System (GPS) has been extensively studied and used for meteorological applications. However PWV estimation using the emerging BeiDou Navigation Satellite System (BDS) is very limited. In this paper the PWV estimation strategy and the evaluation of the results inferred from ground-based BDS observations using Precise Point Positioning (PPP) method are presented. BDS and GPS data from 10 stations distributed in the Asia–Pacific and West Indian Ocean regions during the year 2013 are processed using the PANDA (Position and Navigation Data Analyst) software package. The BDS-PWV and GPS-PWV are derived from the BDS-only and GPS-only observations, respectively. The PPP positioning differences between BDS-only and GPS-only show a standard deviation (STD) Indian Ocean regions and that BDS alone can be used for PWV estimation with an accuracy comparable to GPS.

Min Li; Wenwen Li; Chuang Shi; Qile Zhao; Xing Su; Lizhong Qu; Zhizhao Liu

2014-01-01T23:59:59.000Z

184

Uranium-series isotopes transport in surface, vadose and ground waters at San Marcos uranium bearing basin, Chihuahua, Mexico  

Science Journals Connector (OSTI)

In the U deposit area at San Marcos in Chihuahua, Mexico, hydrogeological and climatic conditions are very similar to the Nopal I, Peña Blanca U deposit, 50 km away. The physicochemical parameters and activity concentrations of several 238U-series isotopes have been determined in surface, vadose and ground waters at San Marcos. The application of some published models to activity ratios of these isotopes has allowed assessing the order of magnitude of transport parameters in the area. Resulting retardation factors in San Marcos area are Rf238 ? 250–14,000 for the unsaturated zone and ?110–1100 for the saturated zone. The results confirm that the mobility of U in San Marcos is also similar to that of the Nopal I U deposit and this area can be considered as a natural analog of areas suitable for geologic repositories of high-level nuclear waste.

Juan Carlos Burillo Montúfar; Manuel Reyes Cortés; Ignacio Alfonso Reyes Cortés; Ma. Socorro Espino Valdez; Octavio Raúl Hinojosa de la Garza; Diana Pamela Nevárez Ronquillo; Eduardo Herrera Peraza; Marusia Rentería Villalobos; María Elena Montero Cabrera

2012-01-01T23:59:59.000Z

185

2014-09-18 Issuance: Energy Conservation Standard for Alternative Efficiency Determination Methods, Basic Model Definition, and Compliance for Commercial HVAC, Refrigeration, and Water Heating Equipment; Supplemental Notice of Proposed Rulemaking  

Energy.gov (U.S. Department of Energy (DOE))

This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding energy conservation standards for alternative efficiency determination methods, basic model definition, and compliance for commercial HVAC, Refrigeration, and Water Heating Equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on September 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

186

Chemical and Isotopic Composition and Gas Concentrations of Ground Water and Surface Water from Selected Sites At and Near the Idaho National Engineering and Environmental Laboratory, Idaho, 1994-97  

SciTech Connect

>From May 1994 through May 1997, the US Geological Survey, in cooperation with the US Department of Energy, collected water samples from 86 wells completed in the Snake River Plain aquifer at and near the Idaho National Engineering and Environmental Laboratory. The samples were analyzed for a variety of chemical constituents including all major elements and 22 trace elements. Concentrations of scandium, yttrium, and the lanthanide series were measured in samples from 11 wells and 1 hot spring. The data will be used to determine the fraction of young water in the ground water. The fraction of young water must be known to calculate the ages of ground water using chlorofluorocarbons. The concentrations of the isotopes deuterium, oxygen-18, carbon-13, carbon-14, and tritium were measured in many ground water, surface-water and spring samples. The isotopic composition will provide clues to the origin and sources of water in the Snake River Plain aquifer. Concentrations ! of helium-3 , helium-4, total helium, and neon were measured in most groundwater samples, and the results will be used to determine the recharge temperature, and to date the ground waters.

E. Busenberg; L. N. Plummer; M. W. Doughten; P. K. Widman; R. C. Bartholomay (USGS)

2000-05-30T23:59:59.000Z

187

Research Ethics & Compliance Support  

E-Print Network (OSTI)

Research Ethics & Compliance Support Dr Ted Rohr, Director RECS #12;http://research.unsw.edu.au/research-ethics-and-compliance-support-recs #12;Research is considered by: Human Research Ethics Committees (HRECs) A and B: � All human research involving more than low risk Human Research Ethics Advisory Panels (HREAPs) A to I: � All human research

Blennerhassett, Peter

188

Estimating Persistent Mass Flux of Volatile Contaminants from the Vadose Zone to Ground Water  

SciTech Connect

Contaminants may persist for long time periods within low permeability portions of the vadose zone where they cannot be effectively treated and are a potential continuing source of contamination to groundwater. Setting appropriate vadose zone remediation goals requires evaluating these persistent sources in terms of their impact on meeting groundwater remediation goals. One-dimensional approaches for estimating transport of volatile contaminants in the vadose zone are considered and compared to a one-dimensional flux-continuity-based assessment of vapor-phase contaminant movement from the vadose zone to the groundwater. The flux-continuity-based assessment demonstrates that the ability of the groundwater to move contaminant away from the water table controls the vapor-phase mass flux from the vadose zone across the water table. Limitations of the one-dimensional approaches are then discussed with respect to the need for further method development and application of two- or three-dimensional numerical modeling. The carbon tetrachloride (CT) plume at the U.S. Department of Energy Hanford Site is used as an example of a site where persistent vadose zone contamination needs to be considered in the context of groundwater remediation.

Truex, Michael J.; Oostrom, Martinus; Brusseau, Mark

2009-05-04T23:59:59.000Z

189

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period, January 1-March 31, 1988: Volume 6, Appendix B (contd)  

SciTech Connect

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W7-5; 299-W7-6; 299-W8-1; 299-W9-1; 299-W10-13. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

190

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 8, Appendix B (contd)  

SciTech Connect

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W18-21; 299-W18-22; 299-W18-23; 299-W18-24. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

191

Ground-water monitoring compliance projects for Hanford Site facilities: Progress report, January 1-March 31, 1988: Volume 3, Appendix A  

SciTech Connect

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E32-2; 299-E32-3; 299-E32-4; 299-E33-28; 299-E33-29. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

192

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 2, Appendix A  

SciTech Connect

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E27-8; 299-E27-9; 299-E27-10; 299-E28-26; 299-E28-27. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

193

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for January 1 to March 31, 1988: Volume 9: Appendix C  

SciTech Connect

The appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the first quarter of calendar year 1988 (January through March). The data in this volume of Appendix C cover the following wells: 199-N-58; 199-N-59; 199-N-60; 199-N-61; 199-N-67. The data are presented in the following order: Well Completion Report/Title III Inspection List, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

194

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 7, Appendix B (contd)  

SciTech Connect

This appendix is one of nine volumes, and presents data describing wwlls completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W10-14; 299-W15-15; 299-W15-16; 299-W15-17; 299-W15-18. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

195

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 4, Appendix A (contd)  

SciTech Connect

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E33-30; 299-E34-2; 299-E34-3; 299-E34-4; 299-E34-5; 299-E34-6. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

196

Slow Strain Rate Testing of Alloy 22 in Simulated Concentrated Ground Waters  

SciTech Connect

The proposed engineering barriers for the high-level nuclear waste repository in Yucca Mountain include a double walled container and a detached drip shield. The candidate material for the external wall of the container is Alloy 22 (N06022). One of the anticipated degradation modes for the containers could be environmentally assisted cracking (EAC). The objective of the current research was to characterize the effect of applied potential and temperature on the susceptibility of Alloy 22 to EAC in simulated concentrated water (SCW) and other environments using the slow strain rate technique (SSRT). Results show that the temperature and applied potential have a strong influence on the susceptibility of Alloy 22 to suffer EAC in SCW solution. Limited results show that sodium fluoride solution is more detrimental than sodium chloride solution.

King, K J; Wong, L L; Estill, J C; Rebak, R B

2003-10-29T23:59:59.000Z

197

Compliance Documents | Department of Energy  

Office of Environmental Management (EM)

Reactor during decommissioning. Compliance and other legal documents illustrate and help support the development of effective compliance approaches and strategies, and can...

198

Performance of an experimental ground-coupled heat pump system for heating, cooling and domestic hot-water operation  

Science Journals Connector (OSTI)

Abstract The ground-coupled heat pump (GCHP) system is a type of renewable energy technology providing space heating and cooling as well as domestic hot water. However, experimental studies on GCHP systems are still insufficient. This paper first presents an energy-operational optimisation device for a GCHP system involving insertion of a buffer tank between the heat pump unit and fan coil units and consumer supply using quantitative adjustment with a variable speed circulating pump. Then, the experimental measurements are used to test the performance of the GCHP system in different operating modes. The main performance parameters (energy efficiency and CO2 emissions) are obtained for one month of operation using both classical and optimised adjustment of the GCHP system, and a comparative analysis of these performances is performed. In addition, using TRNSYS (Transient Systems Simulation) software, two simulation models of thermal energy consumption in heating, cooling and domestic hot-water operation are developed. Finally, the simulations obtained using TRNSYS are analysed and compared to experimental data, resulting in good agreement and thus the simulation models are validated.

Calin Sebarchievici; Ioan Sarbu

2015-01-01T23:59:59.000Z

199

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Project_!.!!formatlon Doll!r Reseed~ ~u.pment and Ol.mp lludts The table below Ia to be completed by the Project Lead and ,.vi-ed by the Envwonmental Spec1ull.r ao\d the DOll NEPA Compliance Officer. NOTE, If Ch *r :,r· ol .ir.Uf · OC" '" , PtOjWater. of the State?" r Will the profec:t - rwqulre a Corpa of l!nglneef-s permit? 0 Impacts Anllc lpatadt No I NA I 0 0 jo o (8] 0 j r!l o I ~ 0 Impacts Antle ted? Yea No NA

200

Effects of land disposal of municipal sewage sludge on soil, streambed sediment, and ground- and surface-water quality at a site near Denver, Colorado  

SciTech Connect

The report describes the effects of burial and land application of municipal sewage sludge on soil and streambed sediment and water quality in the underlying aquifers and surface water within and around the Lowry sewage-sludge-disposal area. The existing ground-water observation-well network at the disposal area was expanded for the study. Surface-water-sampling sites were selected so that runoff could be sampled from intense rainstorms or snowmelt. The sampling frequency for ground-water and surface-water runoff was changed from yearly to quarterly, and soil samples were collected. Four years of data were collected from 1984 to 1987 during the expanded monitoring program at the Lowry sewage-sludge-disposal area. These data, in addition to the data collected by the U.S. Geological Survey from 1981 to 1983, were used to determine effects of sewage-sludge-disposal on soil and streambed sediment and surface- and ground-water quality at the disposal area.

Gaggiani, N.G.

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Evaporative Concentration of 100x J13 Ground Water at 60% Relative Humidity and 90C  

SciTech Connect

In these experiments we studied the behavior of a synthetic concentrated J13 solution as it comes in contact with a Ni-Cr-Mo-alloy selected for waste canisters in the designated high-level nuclear-waste repository at Yucca Mountain, Nevada. Concentrated synthetic J13 solution was allowed to drip slowly onto heated test specimens (90 C, 60% relative humidity) where the water moved down the surface of the specimens, evaporated and minerals precipitated. Mineral separation or zoning along the evaporation path was not observed. We infer from solid analyses and geochemical modeling, that the most corrosive components (Ca, Mg, and F) are limited by mineral precipitation. Minerals identified by x-ray diffraction include thermonatrite, natrite, and trona, all sodium carbonate minerals, as well as kogarkoite (Na{sub 3}SO{sub 4}F), halite (NaCl), and niter (KNO{sub 3}). Calcite and a magnesium silicate precipitation are based on chemical analyses of the solids and geochemical modeling. The most significant finding of this study is that sulfate and fluoride concentrations are controlled by the solubility of kogarkoite. Kogarkoite thermodynamic data are needed in the Yucca Mountain Project database to predict the corrosiveness of carbonate brines and to establish the extent to which fluoride is removed from the brines as a solid.

Staggs, K; Maureen Alai,; Hailey, P; Carroll, S A; Sutton, M; Nguyen, Q A

2003-12-04T23:59:59.000Z

202

NEPA Compliance Officer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Officer Compliance Officer Award #: EE 000 0784 Recipient: County of Escambia ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) MC Blanchard Judicial Center B5.1 Historic Preservation Clause and Old Courthouse Block Waste Stream Clause Office Complex EEIP Road Prison Geothermal Earth Coupled HVAC Upgrade A9, All Allowable Activities: Information gathering, data collection, reporting, and preliminary design. Prohibited Activities: Implementation of final design, construction, and operation tasks for this project should be conditioned pending further NEPA review. Landfill Gas Extraction and Control System A9, All Allowable Activities: Information gathering,

203

An ecological study examining the correlation of end-stage renal disease and ground water heavy metal content in Texas counties  

E-Print Network (OSTI)

An ecological study was conducted to examine the correlation of end-stage renal disease (ESRD) and the ground water heavy metal level of lead, arsenic, cadmium, mercury and the cumulative level of all four metals in Texas counties. The heavy meal...

Bishop, Scott Alan

2012-06-07T23:59:59.000Z

204

Numerical modelling of ground water flow using MODFLOW, Indian Journal of Science, 2013, 2(4), 86-92, www.discovery.org.in  

E-Print Network (OSTI)

management approaches. However, there should be no expectation of a single `true' model, and model outputsRESEARCH Kumar, Numerical modelling of ground water flow using MODFLOW, Indian Journal of Science management or impact of new development scenarios. However, if the modelling studies are not well designed

Kumar, C.P.

205

Protection of ground and surface waters, January 1982-August 1987: Citations from AGRICOLA (Agricultural Online Access) concerning diseases and other environmental considerations. Final report  

SciTech Connect

The citations in this bibliography are selected from English-language material from the international literature on the agricultural aspects of the pollution of ground and surface water by chemicals. Some of the subject areas include: Agricultural operations; Pesticides; Legislation; Land use; Urban hydrology and pollution; Food processing wastes; and Waste treatment.

Bebee, C.N.

1987-07-01T23:59:59.000Z

206

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

f8J 0 Hazardous A. ir Pollutants? Is the project subject to emissions limitations in an Air Quality 0 f8J 0 Control Region? 2 Revised on: 1111212008 NEPA COMPLIANCE SURVEY Impacts...

207

Environmental Compliance Guide  

SciTech Connect

The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.

None

1981-02-01T23:59:59.000Z

208

Ethics and Compliance Manager  

Energy.gov (U.S. Department of Energy (DOE))

This position is located in the Office of the Deputy Administrator, Compliance and Governance Section. Additional vacancies may be filled through this vacancy announcement or if they become available.

209

340 Facility compliance assessment  

SciTech Connect

This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility.

English, S.L. [Pacific Northwest Lab., Richland, WA (United States)

1993-10-01T23:59:59.000Z

210

II. GENERAL COMPLIANCE SUPPLEMENT INTRODUCTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rather than repeat these compliance requirements, audit objectives, and suggested audit procedures for each program, they are provided once in this part. For each program in this Compliance Supplement (this Supplement), the program-specific compliance guidance section (Part III of this guidance) contains additional information about the compliance requirements that arise from laws and regulations applicable to each program, including the requirements specific to each program that should be tested using the guidance in this part. Compliance Requirements, Audit Objectives, and Suggested Audit Procedures At the end of this General Compliance Supplement is a matrix that outlines the compliance requirements, including special tests and provisions, that are applicable to programs performed under

211

3Compliance Status 2003 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

3-1 3Compliance Status 2003 SITE ENVIRONMENTAL REPORT Brookhaven National Laboratory (BNL supply met all drinking water requirements. Groundwater monitoring at the Major Petroleum Facility reported to the New York State Department of Environmental Conservation (NYSDEC). Twenty-two reportable

Homes, Christopher C.

212

Application of encapsulation (pH-sensitive polymer and phosphate buffer macrocapsules): A novel approach to remediation of acidic ground water  

Science Journals Connector (OSTI)

Macrocapsules, composed of a pH-sensitive polymer and phosphate buffer, offer a novel remediation alternative for acidic ground waters. To test their potential effectiveness, laboratory experiments were carried out followed by a field trial within a coal pile runoff (CPR) acidic contaminant plume. Results of traditional limestone and macrocapsule treatments were compared in both laboratory and field experiments. Macrocapsules were more effective than limestone as a passive treatment for raising pH in well water from 2.5 to 6 in both laboratory and field experiments. The limestone treatments had limited impact on pH, only increasing pH as high as 3.3, and armoring by iron was evident in the field trial. Aluminum, iron and sulfate concentrations remained relatively constant throughout the experiments, but phosphate increased (0.15–32 mg/L), indicating macrocapsule release. This research confirmed that macrocapsules may be an effective alternative to limestone to treat highly acidic ground water.

C. Marjorie Aelion; Harley T. Davis; Joseph R.V. Flora; Brian C. Kirtland; Mark B. Amidon

2009-01-01T23:59:59.000Z

213

UMTRA Ground Water Project  

Office of Legacy Management (LM)

... 7 Figure 3. Uranium Distribution from April 2013 Sampling at the Gunnison, Colorado, Processing Site ......

214

Ground Water Cooling System  

E-Print Network (OSTI)

to conc~ntrate their turbine business efforts in the electric power generation market. In 1979, Westinghouse Canada Inc., Turbine and Generator Division, embarked on an intensive expansion program to increase production capabili ties and improve... capacity well was recorded. This well was drilled in the Town of Renfrew, February 1963, for United Dairy and Poultry Coop. From the well drillers log, it was determined that the well was approximately 700 feet deep with a casing diameter of eight...

Greaves, K.; Chave, G. H.

1984-01-01T23:59:59.000Z

215

DOE NEPA Compliance Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Compliance Officers NEPA Compliance Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. Please send updates to yardena.mansoor@hq.doe.gov Oct 04, 2013 Forrestal (FORS) Addresses: Germantown (GTN) Addresses: 1000 Independence Ave SW 1000 Independence Ave SW Washington, DC 20585 Washington, DC 20585-1290 . Use for U.S. Postal Service mail. 19901 Germantown Road Germantown, MD 20874-1290 Use for EXPRESS DELIVERY (e.g. Federal Express, UPS). NAME, OFFICE, E-MAIL FAX ADDRESS PHONE william.bierbower@hq.doe.gov Advanced Research Projects Agency-Energy 202-287-6585 FORS AR-1 20585 ARPA-E William Bierbower lori.gray@go.doe.gov Energy Efficiency and Renewable Energy, Golden Field Office 720-356-1568 720-356-1350 Department of Energy

216

Dedicated to Sharing Information About Water Management and the Florida LAKEWATCH Program Volume 58 (2012) Volunteer Ground-Water Monitoring Coming to  

E-Print Network (OSTI)

Water Management Districts (WMDs) or the Florida Department of Environmental1 Dedicated to Sharing Information About Water Management and the Florida LAKEWATCH Program being monitored for water levels by the state's water management districts

Florida, University of

217

Coach Compliance Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Coach Compliance Form Coach Compliance Form My team is participating in the Department of Energy's Lithium-Ion Battery Car Competition as part of the National Science Bowl ® . I have reviewed the following documents with the participating students: o Safety Hazards of Batteries o Material Safety Data Sheet - Lithium Polymer Battery o Electric Battery Car Competition Rules ______________________________ ______________ Coach Signature Date Name of School: ____________________________________________ Name of Coach (Please Print): ________________________________ Coach's Email Address: ______________________________________ Please sign this form and either mail, fax or e-mail a pdf to the National Renewable Energy Laboratory: National Renewable Energy Laboratory

218

Hydrogeology of the 200 Areas low-level burial grounds: An interim report: Volume 1, Text  

SciTech Connect

This report presents information derived from the installation of 35 ground-water monitoring wells around six low-level radioactive/hazardous waste burial grounds located in the 200 Areas of the Hanford Site in southeastern Washington State. This information was collected between May 20, 1987 and August 1, 1988. The contents of this report have been divided into two volumes. This volume contains the main text. Volume 2 contains the appendixes, including data and supporting information that verify content and results found in the main text. This report documents information collected by the Pacific Northwest Laboratory at the request of Westinghouse Hanford Company. Presented in this report are the preliminary interpretations of the hydrogeologic environment of six low-level burial grounds, which comprise four waste management areas (WMAs) located in the 200 Areas of the Hanford Site. This information and its accompanying interpretations were derived from sampling and testing activities associated with the construction of 35 ground-water monitoring wells as well as a multitude of previously existing boreholes. The new monitoring wells were installed as part of a ground-water monitoring program initiated in 1986. This ground-water monitoring program is based on requirements for interim status facilities in compliance with the Resource Conservation and Recovery Act (1976).

Last, G.V.; Bjornstad, B.N.; Bergeron, M.P.; Wallace, D.W.; Newcomer, D.R.; Schramke, J.A.; Chamness, M.A.; Cline, C.S.; Airhart, S.P.; Wilbur, J.S.

1989-01-01T23:59:59.000Z

219

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

and DOE National Nuclear Security Administration policy to conduct its operations in compliance, and best management practices. DOE and its contractors make every effort to conduct operationsEnvironmental Compliance 2-1 2. Environmental Compliance It is DOE Oak Ridge Operations Office

Pennycook, Steve

220

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

Security Administration (NNSA) policy to conduct operations in compliance with federal, state, and local. DOE and its contractors make every effort to conduct operations in compliance with the letter three ORR facilities operated in compliance with the regulatory dose limits of Tennessee Rule 1200

Pennycook, Steve

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

[Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 3, Sampling and analysis plan (SAP): Phase 1, Task 4, Field Investigation: Draft  

SciTech Connect

In April 1990, Wright-Patterson Air Force Base (WPAFB), initiated an investigation to evaluate a potential Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action to prevent, to the extent practicable, the offsite migration of contaminated ground water from WPAFB. WPAFB retained the services of the Environmental Management Operations (EMO) and its principle subcontractor, International Technology Corporation (IT) to complete Phase 1 of the environmental investigation of ground-water contamination at WPAFB. Phase 1 of the investigation involves the short-term evaluation and potential design for a program to remove ground-water contamination that appears to be migrating across the western boundary of Area C, and across the northern boundary of Area B along Springfield Pike. Primarily, Task 4 of Phase 1 focuses on collection of information at the Area C and Springfield Pike boundaries of WPAFB. This Sampling and Analysis Plan (SAP) has been prepared to assist in completion of the Task 4 field investigation and is comprised of the Quality Assurance Project Plan (QAPP) and the Field Sampling Plan (FSP).

Not Available

1991-10-01T23:59:59.000Z

222

Export Compliance Certificate Program  

E-Print Network (OSTI)

bearing the UC seal signifies a well- known, uncompromising standard of academic excellence. #12;Export-depth knowledge or thorough review of export compliance regulations Individuals at the front line of defense plan approach Identify risks early within a transaction in order to avoid costly delays or potential

Barrett, Jeffrey A.

223

Substation grounding.  

E-Print Network (OSTI)

??Designing a proper substation grounding system is quite complicating. Many parameters affect its design. In order for a grounding design to be safe, it needs… (more)

Baleva, Inna

2012-01-01T23:59:59.000Z

224

Measured Performance and Analysis of Ground Source Heat Pumps for Space Conditioning and for Water Heating in a Low-Energy Test House Operated under Simulated Occupancy Conditions  

SciTech Connect

In this paper we present measured performance and efficiency metrics of Ground Source Heat Pumps (GSHPs) for space conditioning and for water heating connected to a horizontal ground heat exchanger (GHX) loop. The units were installed in a 345m2 (3700ft2) high-efficiency test house built with structural insulated panels (SIPs), operated under simulated occupancy conditions, and located in Oak Ridge, Tennessee (USA) in US Climate Zone 4 . The paper describes distinctive features of the building envelope, ground loop, and equipment, and provides detailed monthly performance of the GSHP system. Space conditioning needs of the house were completely satisfied by a nominal 2-ton (7.0 kW) water-to-air GSHP (WA-GSHP) unit with almost no auxiliary heat usage. Recommendations for further improvement through engineering design changes are identified. The comprehensive set of data and analyses demonstrate the feasibility and practicality of GSHPs in residential applications and their potential to help achieve source energy and greenhouse gas emission reduction targets set under the IECC 2012 Standard.

Ally, Moonis Raza [ORNL] [ORNL; Munk, Jeffrey D [ORNL] [ORNL; Baxter, Van D [ORNL] [ORNL; Gehl, Anthony C [ORNL] [ORNL

2012-01-01T23:59:59.000Z

225

Estimation of natural ground water recharge for the performance assessment of a low-level waste disposal facility at the Hanford Site  

SciTech Connect

In 1994, the Pacific Northwest Laboratory (PNL) initiated the Recharge Task, under the PNL Vitrification Technology Development (PVTD) project, to assist Westinghouse Hanford Company (WHC) in designing and assessing the performance of a low-level waste (LLW) disposal facility for the US Department of Energy (DOE). The Recharge Task was established to address the issue of ground water recharge in and around the LLW facility and throughout the Hanford Site as it affects the unconfined aquifer under the facility. The objectives of this report are to summarize the current knowledge of natural ground water recharge at the Hanford Site and to outline the work that must be completed in order to provide defensible estimates of recharge for use in the performance assessment of this LLW disposal facility. Recharge studies at the Hanford Site indicate that recharge rates are highly variable, ranging from nearly zero to greater than 100 mm/yr depending on precipitation, vegetative cover, and soil types. Coarse-textured soils without plants yielded the greatest recharge. Finer-textured soils, with or without plants, yielded the least. Lysimeters provided accurate, short-term measurements of recharge as well as water-balance data for the soil-atmosphere interface and root zone. Tracers provided estimates of longer-term average recharge rates in undisturbed settings. Numerical models demonstrated the sensitivity of recharge rates to different processes and forecast recharge rates for different conditions. All of these tools (lysimetry, tracers, and numerical models) are considered vital to the development of defensible estimates of natural ground water recharge rates for the performance assessment of a LLW disposal facility at the Hanford Site.

Rockhold, M.L.; Fayer, M.J.; Kincaid, C.T.; Gee, G.W.

1995-03-01T23:59:59.000Z

226

TEX-A-SYST: Reducing the Risk of Ground Water Contamination by Improving Well-Head Management and Conditions  

E-Print Network (OSTI)

can release large amounts of bacteria, nitrates and other contam- inants that could pollute well water. The Texas Water Well Drillers Act (1985), the Water Well Pump Installer Act (1991) and vari- ous other legislative actions have guided devel- opment... of regulations, primarily contained in Chapter 287 of the Texas Administrative Code, to provide for licensing of well drillers and pump installers and establish standards for drilling, capping and plugging water wells. For wells drilled before the effective date...

Harris, Bill L.; Hoffman, D.; Mazac Jr., F. J.

1997-08-29T23:59:59.000Z

227

Kinetic Studies on the Hydrogen Peroxide-Enhanced In Situ Biodegradation of Hydrocarbons in Water-Saturated Ground Zone  

Science Journals Connector (OSTI)

Techniques are rapidly developing for aerobic biodegradation of hydrocarbons in lower water-bearing formations. It is well known that...

Dr. E. R. Barenschee; Dr. O. Helmling; S. Dahmer; B. Del Grosso…

1990-01-01T23:59:59.000Z

228

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Project lnfonnation Project Title: New Drilling Location in Section 29 Date: 12-10-2009 DOE Code: 6730.020.78002 Contractor Code: 8067-371 Project Lead: Mark Duletsky Project Overview The project will involve excavating 3-4 backhoe pits to a depth of about 8 feet to observe soil characteristics 1. What are the environmental impacts? in the vicinity of our planned reserve pit excavation area. 2. What is the legal location? NE 1/4, SE 1/4, Sec. 29. T39N. R78W. Natrona County, Wyoming 3. What is the duration of the project? 4. What major equipment will be used 1 day if any (work over rig, drilling rig, etc.)? Backhoe The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

229

ENVIRONMENTAL COMPLIANCE (EC)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL COMPLIANCE (EC) OBJECTIVE EC.1: LANL has established and implemented an Environmental Compliance program to ensure safe accomplishment of work and operations within the requirements of the BIO, TSRs, SER, and regulatory permits for WCRR Facility activities. Sufficient numbers of qualified personnel, as well as adequate facilities and equipment, are available to support WCRRF operations. (CRs 1, 4, 6, 7, 9) CRITERIA 1. WCRRF has implemented the requirements for hazardous materials and waste management programs, as described in the WCRRF BIO and TSRs (WCRRF TSRs 5.6.9 and 5.10.2). 2. Environmental permits required for WCRR operations have been met. Processes are in place to ensure that these requirements are maintained. Environmental regulations include Resource

230

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Project l nfonnation Project Title: Reclamation ofT-2-14 Date: 11/2412009 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview We will be removing old piping from the treater@ T-2-14. We will also remove the berm and grade and 1. What are the environmental impacts? reclamate location. The duration of this project will be approx. 2 days. Equipment that will be used is as follows backhoe. dumptruck, blade,and a tiller so we can seed with native grasses. 2. What is the legal location? 3. What is the duration of the project? 4. What major equipment will be used if any (woO< over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

231

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Project lnfonnation Project Title: Replace electrical line from well to power pole Date: 3/10/2010 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview No impact to the environment. 1. What are the environmental impacts? Dig up old electrical line from pumping unit on 61-S-34 to power pole east of well , {approximately 75 feet 2. What is the legal location? from unit) and replace with new line. 3. What is the duration of the project? 4. What major equipment will be used 1 day if any (work over rig , drilling rig , etc.)? Electrician, ditch witch and operator for equipment The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

232

Residential Building Code Compliance  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Residential Building Code Compliance: Recent Findings and Implications Energy use in residential buildings in the U.S. is significant-about 20% of primary energy use. While several approaches reduce energy use such as appliance standards and utility programs, enforcing state building energy codes is one of the most promising. However, one of the challenges is to understand the rate of compliance within the building community. Utility companies typically use these codes as the baseline for providing incentives to builders participating in utility-sponsored residential new construction (RNC) programs. However, because builders may construct homes that fail to meet energy codes, energy use in the actual baseline is higher than would be expected if all buildings complied with the code. Also,

233

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Project lnfonnation Project Title: C-EAG. Maintenance I grading of existing roads Date: 8/4/2011 and road drainages (barrow ditches): ex 81.3 DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview 1. Brief project description [include C-EA 6. Maintenance I grading of existing roads and road drai nages anything that could impact the (barrow ditches) : ex 81.3 environment] Existing roads defined as per May 2010 Aerial Photos. (Changing out culverts, grading I modifying embankments, etc., that has potential to impact wetlands, requires a NCS.) The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

234

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Project lnfonnation Project Title: Restoration of 77 -13-SX-3 Date: 2-8-1 0 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview We will be restoring 77-SX-3 per procedure. 1. What are the environmental impacts? The duration of this project will be 3-4 days. 2. What is the leg al location? 3. What is the duration of the project? The equipment to be used will be Backhoe, welder, tiller dump truck. 4. What major equipment will be used if any (work over rig , drilling rig , We will take oil contaminated dirt to the Eastside landfarm and backfill with d ean fill dirt from sec. 20. etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

235

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Project lnfonnation Project Title: e-EA5. Reclamation of well sites Date: 8/4/2011 DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview e-EA 5. Reclamation of wellsites : ex 81.3 and ex 86.1 1. Brief project description [include anything that could impact the Small-scale, short-term cleanup actions including excavation and environment] consolidation of contaminated soils, removal of underground piping, removal of rig anchors or T-bars, drainage control , transport and backfilling of clean soil I fill dirt, and reseeding . The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

236

Consulting, Construction and Operating Results of a Full-Scale Biotechnological Plant for the Oxidation of Iron and Manganese with Simultaneous Elimination of Volatile Chlorinated Hydrocarbons from Ground Water  

Science Journals Connector (OSTI)

The ground water in the south part of Hannover, known ... Südstadt”, is partially polluted with volatile chlorinated hydrocarbons (C1HC). This contamination originated from a ... the factory stands as well as the...

V. Quentmeier; M. Saake

1990-01-01T23:59:59.000Z

237

Water quality Water quantity  

E-Print Network (OSTI)

01-1 · Water quality · Water quantity · Remediation strategies MinE 422: Water Resources: Younger, Banwart and Hedin. 2002. Mine Water. Hydrology, Pollution, Remediation. Impacts of mining on water mining ­ Often the largest long term issue ­ Water quality affected, surface/ground water pollution

Boisvert, Jeff

238

Water quality Water quantity  

E-Print Network (OSTI)

· Water quality · Water quantity · Remediation strategies MinE 422: Water Resources: Younger, Banwart and Hedin. 2002. Mine Water. Hydrology, Pollution, Remediation. Impacts of mining on water mining ­ Often the largest long term issue ­ Water quality affected, surface/ground water pollution

Boisvert, Jeff

239

The prediction of the effectiveness of interceptor trenches in the remediation of ground-water contamination by petroleum hydrocarbons  

E-Print Network (OSTI)

. LIST OF FIGURES. . LIST OF TABLES INTRODUCTION. . Objectives. Previous Works Methods . . . . . . . . . . . . . . . . . . SITE DESCRIPTIONS . . Site A. Site B. Site C . . . FIELD STUDIES. . . Site A. . Site B. TABLE OF CONTENTS Page 15... . . 68 . 71 --. . 73 -- 77 Figure LIST OF FIGURES Page 1. General layout of Site A showing ground-flow in the vicinity of the interceptor trench 2. Schematic cross-sectional view of the interceptor trench at Site A. . . . . . . . . . . . . . . 10...

Mast, Mary Katherine

2012-06-07T23:59:59.000Z

240

Nutrients, pesticides, surfactants, and trace metals in ground water from the Howe and Mud Lake areas upgradient from the Idaho National Engineering Laboratory, Idaho  

SciTech Connect

Reconnaissance-level sampling for selected nutrients, pesticides, and surfactants in ground water upgradient from the Idaho National Engineering Laboratory was conducted during June 1989. Water samples collected from eight irrigation wells, five domestic or livestock wells, and two irrigation canals were analyzed for nutrients, herbicides, insecticides and polychlorinated compounds, and surfactants. In addition to the above constituents, water samples from one irrigation well, one domestic well, and one irrigation canal were analyzed for arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver. Concentrations of nitrite plus nitrate as nitrogen ranged from less than the reporting to 6.10 mg/L (milligrams per liter), and orthophosphate concentrations as phosphorus ranged from less than the reporting level to 0.070 mg/L (micrograms per liter). Concentrations of 2,4-D in two water samples were 0.1 {mu}g/L and 0.10 {mu}g/L. Water samples analyzed for 15 other herbicides, 10 carbamate insecticides, 11 organophosphorus insecticides, and 15 organochlorine insecticides, gross polychlorinated biphenyls, and gross polychlorinated naphthalenes all had concentration below their reporting levels. Concentrations of surfactants ranged from 0.02 to 0.35 mg/L. Arsenic, barium, chromium, selenium, and silver concentrations exceeded reporting levels in most of the samples. 19 refs., 1 fig., 19 tabs.

Edwards, D.D.; Bartholomay, R.C.; Bennett, C.M.

1990-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Christina Bigelow Compliance Counsel  

Gasoline and Diesel Fuel Update (EIA)

Christina Bigelow Christina Bigelow Compliance Counsel Direct Dial: 317-249-5132 E-mail: cbigelow@misoenergy.org November 6, 2013 Mr. Stan Kaplan Mr. William Booth U.S. Energy Information Administration 1000 Independence Ave., SW Washington, DC 20585 VIA EMAIL RE: Form EIA-930 Hourly and Daily Balancing Authority Operations Report Revisions Dear Mssrs. Booth and Kaplan: On behalf of the Midcontinent Independent System Operator, Inc 1 . ("MISO"), I want to extend our appreciation for your time and consideration of the input of the Independent System Operators and Regional Transmission Organizations ("ISOs/RTOs") regarding the proposal to collect additional Balancing Authority ("BA") operations information from all "Balancing

242

Compliance Certification Application  

NLE Websites -- All DOE Office Websites (Extended Search)

40 CFR Part 191 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant Appendix PIC United States Department of Energy Waste Isolation Pilot Plant Carlsbad Area Office Carlsbad, New Mexico Passive Institutional Controls Conceptual Design Report PASSIVE INSTITUTIONAL CONTROLS CONCEPTUAL DESIGN REPORT REVISION 0 MAY 14, 1996 1 C PASSIVE INSTITUTIONAL CONTROLS DESIGN REPORT REVISION 0 PASSIVE INSTITUTIONAL CONTROLS CONCEPTUAL DESIGN REPORT MAY 1 4 . 1 9 9 6 TABLE OF CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . 1 A . Purpose . . . . . . . . . . . . . . . . . . . 1 B . Scope . . . . . . . . . . . . . . . . . . . . . 3 C . Background . . . . . . . . . . . . . . . . . . . 7 I1 . SITE DESCRIPTION . . . . . . . . . . . . . . . . . 11 I11 . DESIGN REQUIREMENTS/CRITERIA . . . . . . . . . . 17 IV . MESSAGES . . . . . . . . . . . . . . . . . .

243

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

to conduct its operations in compliance with federal, state, and local environmental protection laws contractors make every effort to conduct operations in compliance with the letter and intent of applicableMahon, and L. G. Shipe Abstract It is the policy of the U.S. Department of Energy Oak Ridge Operations Office

Pennycook, Steve

244

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Project Information Project Title: Survey Centralizer Design Date: 2-10-2010 DOE Code: 6730.020.71091 Contractor Code: 8067-762 Project Lead: Frank Ingham Project Overview 1. What are the environmental No environmental impacts. impacts? Run a logging tool through existing wells at : 2. What is the /ega/location? 67-LBT-3, SW SE sec 3, T38N , R78W 86-1 -X-10 , NE SE Sec 10, T38N , R78W 3. What is the duration of the project? 22-2-X-10H , NW NW Sec 10, T38N , R78W 4. What major equipment will be used if any (work over rig , drilling rig, 4 Days etc.)? Stinger truck or crane . The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

245

Characterization of organic-rich colloids from surface and ground waters at the actinide-contaminated Rocky Flats Environmental Technology Site (RFETS), Colorado, USA  

Science Journals Connector (OSTI)

Colloids, i.e. nanoparticles and macromolecules, play an important role in the environmental dispersion of actinides. Thus, colloids (3 kDa–0.5 ?m) were collected and purified from three different environments, i.e. surface water, pond water and near-surface ground water at the Rocky Flats Environmental Technology Site, Colorado, where elevated actinide concentrations had previously been documented. Their chemical composition was determined in order to better understand their role in actinide migration. All three types of colloid samples were found to be similar in chemical composition, with a higher percentage of organic carbon, OC (5–18%), than any other measured component, and only small amounts of Si, Mn, Al, and Fe (1.5% or below). Analytically determined components account for 40–56% of the colloidal matter, with water likely making up the difference. Transmission electron microscopy (TEM) images of colloidal material from all three sample types indicate the presence of cellulose or chitin, likely from plant (terrestrial and/or aquatic) material. Other major components include humic acid type particles, with only small amounts (<5%) of mineral particles. Our findings of colloids high in organic and low in inorganic matter content agree with previously reported results on Pu(IV) associated with an acidic natural macromolecular organic compound that also contains small amounts of Fe. Pu/OC and Fe/OC ratios both showed a steady decrease from surface water to pond water to groundwater, with a more marked decrease in the Fe/OC ratio, but no significant change in overall colloidal organic carbon (COC) concentrations.

Kimberly A. Roberts; Peter H. Santschi; Gary G. Leppard; M.Marcia West

2004-01-01T23:59:59.000Z

246

FAQS Job Task Analyses - Environmental Compliance | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Compliance FAQS Job Task Analyses - Environmental Compliance FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task...

247

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Project lnfonnation Project Title: Change out down guy on power pole Date: 2-8-10 DOE Code : Contractor Code: Project Lead: Mike Preston Project Overview 1 What are the environmental No impact to the environment impacts? Power pole east of B-1 -33 2. What is the legal location? 3. What is the duration of the project? 3Hr 4. What major equipment will be used if any (worl< over rig, drilling rig, Backhoe and operator for equ1 pment etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE; If Chiing

248

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Project lnfonnation Project Title: NODA 2. Reclamation of decommissioned Date: 8/4/2011 batteries, test satellites, and facilities DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview NODA 2. Reclamation of decommissioned batteries, test satellites, and 1. Brief project description [include facilities : anything that could impact the environment] ex 81 .3 and ex 86.1 Small-scale, short-term cleanup actions including excavation or consolidation of contaminated soils, removal of equipment and underground piping , drainage control, and reseeding. NOD req uired to ensure compliance with Reclamation Procedures. The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

249

Evaluation of preservation methods for selected nutrients in ground water at the Idaho National Engineering Laboratory, Idaho  

SciTech Connect

Water from 28 wells completed in the Snake River Plain aquifer at the Idaho National Engineering Laboratory (INEL) was sampled as part of the US Geological Survey`s quality-assurance program to determine the effect of different preservation methods on nutrient concentrations. Samples were preserved with filtration and with mercuric chloride and chilling, chilling only, or sulfuric acid and chilling. The samples were analyzed for ammonia, nitrite, nitrite plus nitrate, and orthophosphate by the US Geological Survey National Water Quality Laboratory. The study was done in cooperation with the US Department of Energy. The comparison between samples preserved with mercuric chloride and chilling and samples preserved by chilling only showed that all sample pairs were in statistical agreement. Results for ammonia and nitrite plus nitrate samples preserved with sulfuric acid and chilling were within the 95 percent confidence level of the results for the samples preserved by the other two methods and can be considered equivalent to them. Results of this study indicate that discontinuing the use of mercuric chloride as a preservation method for nutrients in water samples will not affect the comparability of data collected at the INEL before and after October 1, 1994.

Bartholomay, R.C.; Williams, L.M.

1996-10-01T23:59:59.000Z

250

Environmental surveillance and compliance at Los Alamos during 1996  

SciTech Connect

This report presents environmental data that characterize environmental performance and addresses compliance with environmental standards and requirements at Los Alamos National Laboratory (LANL or the Laboratory) during 1996. The Laboratory routinely monitors for radiation and for radioactive nonradioactive materials at Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1996 to assess external penetrating radiation; quantities of airborne emissions; and concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, the municipal water supply, soils and sediments, and foodstuffs. Using comparisons with standards and regulations, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment. Laboratory operations were in compliance with all major environmental regulations.

NONE

1997-09-01T23:59:59.000Z

251

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. NEPA COMPLIANCE SURVEY Project lnfonnation Project Title: Reclamation of Pits and Boxes Date: Nov. 3, 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview Reclamation of QD.]y the following Pits and Boxes : 1. Brief project description [include 1. B-2-1 0 Skim Box anything that could impact the 2. B-1-14 Skim Box environment 3. Near66-1-STX-14 Pit 2. Legal location 4. T-5-10 Skim Box 3. Duration of the project 5. WDFUpperPit 6. WDFLowerPit 4. Major equipment to be used 7. WDFSkimBox 8. B-1-3 Pit 9. B-1 -3 Skim Box 10. T-2-34 Pit 11 . B-1-10 Pit 12. B-1 -10 Skim Box 13. SE of SG3 & Welding Shop Skim Box 14. 58.Q4-1-SX-3 Skim Box 15. Near Tank 126 Skim Box 16. 77-1-SX-3 NW of Well Pit 17. T-5-3 Pit

252

Oil Mist Compliance  

SciTech Connect

This report summarizes activities at the KCP related to evaluating and modifying machine tools in order to be in compliance with Section 23 of DOE 10 CFR 851, Worker Safety and Health Program. Section 851.23 (a) states that “Contractors must comply with the following safety and health standards that are applicable to the hazards in their covered workplace”, and subsection 9 contains the following applicable standard: “American Congress of Governmental Industrial Hygienists (ACGIH), ‘Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices,’ (2005) (incorporated by reference, see §851.27) when the ACGIH Threshold Limit Values are lower (more protective) than permissible exposure limits in 29 CFR 1910.” In the 2005 ACGIH – Threshold Limit Value book a Notice of Change was issued for exposure to mineral oil mist used in metalworking fluids (MWFs). The effects of planning for the new facility and which machine tools would be making the transition to the new facility affected which machine tools were modified.

Lazarus, Lloyd

2009-02-02T23:59:59.000Z

253

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

254

Hazardous Waste Compliance Program Plan  

SciTech Connect

The Hazardous Waste Compliance Program Plan (HWCPP) describes how the Rocky Flats Plant institutes a more effective waste management program designed to achieve and maintain strict adherence to the Resource Conservation and Recovery Act (RCRA) requirements. Emphasis is given to improve integration of line operations with programmatic and functional support activities necessary to achieve physical compliance to RCRA regulated equipment, facilities and operations at the floor level. This program focuses on specific activities occurring or which need to occur within buildings containing RCRA regulated units and activities. The plan describes a new approach to achieving and maintaining compliance. This approach concentrates authority and accountability for compliance with the line operating personnel, with support provided from the programmatic functions. This approach requires a higher degree of integration and coordination between operating and program support organizations. The principal changes in emphases are; (1) increased line operations involvement, knowledge and accountability in compliance activities, (2) improved management systems to identify, correct and/or avoid deficiencies and (3) enhanced management attention and employee awareness of compliance related matters.

Potter, G.L.; Holstein, K.A.

1994-05-01T23:59:59.000Z

255

Ground-water levels and tritium concentrations at the Maxey Flats low-level radioactive waste disposal site near Morehead, Kentucky, June 1984 to April 1989  

SciTech Connect

The Maxey Flats disposal site, Kentucky encompasses about 280 acres near the edge of a flat-topped ridge. The ridge is underlain by fractured shale and sandstone beds of the Nancy Member and the Farmers Member of the Borden Formation of Mississippian age. Groundwater flow in the strata beneath the site occurs through fractures, and flow patterns are difficult to delineate. The potentiometric surface also is difficult to delineate because several saturated and unsaturated zones are present in the rocks. Generally, ground-water levels in wells intersecting permeable fractures fluctuated seasonally and were lowest from December through June and highest from July through November. Water levels in the disposal trenches fluctuations less than those in wells, and for most trenches the fluctuations were less than 0.5 foot. From June 1984 to April 1989, tritium concentrations in groundwater ranged from 0 to 2,402,200 picocuries/ml. The greatest and most variable tritium concentrations were in wells along the northwest side of the site. The major conduit of groundwater flow from the trenches in the northwestern part of the site is a fractured sandstone bed that forms the base of most trenches. Elsewhere along the site perimeter, elevated levels of tritium were not detected in wells, and mean tritium were not detected in wells, and mean tritium concentrations showed little change between 1986 and 1988.

Wilson, K.S.; Lyons, B.E. (Geological Survey, Reston, VA (United States))

1991-01-01T23:59:59.000Z

256

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Binary Power Unit Test Binary Power Unit Test Date: 3-29-2010 DOE Code: 6730.020.61045 Contractor Code: 8067-768 Project Lead: Lyle Johnson Project Overview 1 What are the environmental The purpose of the project is to do confirmation testing of the binary power unit at several different impacts? temperatures and rates. This test will be conducted in a location covered in the Site Wide EA It will uses infrastructure installed for another project consisting of a hot-water source and a cooling water source. The 2. What is the legal location? hot water is from well 17 -WX-21 , a Madison well adjacent to the siting location. The cooling water will be 3. What is the duration of the project? pumped from Little Teapot Creek through an existing line and then returned to Teapot Creek. There should

257

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project lnfonnation Project Title: EOR Steam Generator Date: 3-28-2011 DOE Code: 6730-020-51145 Contractor Code: 8067-797 Project Lead: Mark Duletsky Project Overview 1. Brief project description [indude The project will involve pulling and re-running the existing production equipment on up to 4 wells in the field. anything that could impact the When the equipment is re-run into the well, it will have 1.66" steel tubing banded onto it that will transmit environment] heated, very humid, air downhole. The heated, humid, air will be produced using Madison water from the field. The third party contractor equipment contains a Reverse Osmosis water filter system. The system will use approximately 11 gallons of water per day. A 300 to 500 gallon plastic water storage tank will be

258

Novel hybrid materials in the remediation of ground waters contaminated with As(III) and As(V)  

Science Journals Connector (OSTI)

Natural mica type of clay mineral sericite was modified to obtain the materials viz., Al-HDTMA-sericite (AH) and Al-AMBA-sericite (AA) which was characterized by the FT-IR and XRD data and morphologically analyzed by the SEM images. Further, the simulated batch reactor data indicated that increase in sorptive concentration enhanced the uptake of these pollutants and the 1000 times increase in ionic strength i.e., background electrolyte concentration (NaNO3) caused an insignificant decrease in As(V) removal, which inferred that As(V) was adsorbed specifically onto the solid surface. However, it was affected greatly with As(III) pointed that As(III) was sorbed mainly through electrostatic or even with van der Waals attraction. pH dependence data showed that arsenic removal was greatly affected with change in solution pH. Simultaneous presence of phenol in the removal of As(III) or As(V) showed insignificant change in arsenic removal by these materials pointed that different sorption sites available for these two different contaminants. Results obtained under dynamic conditions inferred that materials were reasonably useful in the speciation/attenuation of these two metal ions from water bodies. The breakthrough data was fitted well to the Thomas equation and hence, the maximum amount of the As(III) or As(V) to be loaded was found to be 0.338 and 0.433 mg/g respectively for AA and AH for As(III) and 0.541 and 0.852 mg/g respectively for AA and AH for As(V) under the specified column reactor conditions. Comparing these two materials AH possessed with higher removal capacity than AA, at least, for these two contaminants.

Diwakar Tiwari; Seung Mok Lee

2012-01-01T23:59:59.000Z

259

Small Business Stationary Source Technical and Environmental Compliance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stationary Source Technical and Environmental Stationary Source Technical and Environmental Compliance Assistance Program (Mississippi) Small Business Stationary Source Technical and Environmental Compliance Assistance Program (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State

260

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Project lnfonnation Project Title: Water haul permit location Date: 2-4-10 DOE Code: 6730-02()-51132 Contractor Code: 8067-757 Project Lead: Mark Duletsky Project Overview 1. What are the environmental This is a proposal to move the Water Haul line from the current location to the opposite side of the road. This impacts? action is for environmental and safety considerations. During the rainy season the area adjacent to the loading area becomes extremely muddy. The vehicles using the loading are become loaded down and 2. What is the legal location? cause ruts into the bank of the little teapot creek and on the graded areas. Moving the loading station to a 3. What is the duration of the project? higher position will eliminate the concerns. A pump will be used to draw water from the creek to a 400 bbl

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Project lnfonnation Project Title: Weir Box for Tensleep discharge Date: 1 1-12.{)9 DOE Code: Project Lead: Dan Smallwood Project Overview 1 What are the environmental impacts? 2 . What is the legal location? 3. What 1 s the duration of the projed? 4 . What major equipment will be used if any (work over rig, drilling rig, etc.)? Contractor Code: The primary functions of the bio-treatment facility consist of oil-water separation, cooling, blending, and biological treatment of produced waters. The original facility was designed to treat an average of 50,000 barrels of produced water per day. RMOTC will install at the Tensleep cooling ponds outflow an open channel flow meter suitable for fixed-site monitoring with sensors to measure levels. The flow meter shall contain conversions tor

262

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project lnfonnation Project Title: C-EA 7. Cleanup of "non-reportable" spills of crude Date: 8/4/2011 oil &/or produced water DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview C-EA 7. Cleanup of "non-reportable" spills of crude oil &/or produced 1. Brief project description [include water : ex 85.4 and ex 85.6 anything that could impact the environment] Note : For all 85.4 : Repair of pipeline sections falls under USACE Nationwide Perm it Number 12, Utility Line Activity. For RMOTC's NEPA purposes, non-reportable spills of crude oil &/or produced water are less than one barrel that is NOT environmentally significant. Events that are environmentally significant include those that

263

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D Project lnfonnation Project Title: Emergency flowline repair 78-sx-34 & 68-66-sx-34 Date: 12-29-09 DOE Code: Contractor Code: Project Lead: RickM. Project Overview We dug up the line where the oil was coming out of the ground and had to put 2 clamps on to seal the leak. 1. What are the environmental impacts? The contaminated dirt was hauled to the land farm and after the line was tested we backfilled the hole. this job took 5 hrs. to complete and required a backhoe and two hands. this leak was 100 yards south of well No. 2. What is the legal location? 68-66-sx-34. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

264

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Project lnfonnation Project Title: RMOTC process improvement Old pipe yard clean up. Date: 11-03-09 DOE Code: Contractor Code: Project Lead: Terry Sullivan Project Overview 1. What are the environmental We will dig out the pipe racks that are cemented into the ground, and haul them out. Then remove the impacts? weeds that have taken over the area. Then we will blade the location and have it ready if we ever decide to 2. What is the legal location? make farther improvements. I expect this to take aproximatly one week with two to three hands working on it. The impact to the envoronment should be minimal as this area has already been disturbed. The work will 3. What is the duration of the project? require the use of a backhoe and a blade as well as the cherry picker. This location is located just north of

265

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Project Information Project Title: WhisperGen Relocation to 65-S-1 0 j.,.. I~ 6 T -9-?t. / I f I ii?J { Date: 3116/2010 DOE Code: Contractor Code: Project Lead: Everett Walker r - - Project Overview ~ E £ N c. 5 ,;;g: z II(_ 5/ Z?fo 9 )cl- I'J c. '5 :::JT Z""'O ( ID 1 1 1 tJ 'I)! Jo~ What are the environmental The Environmental Specialist and the Field Coordinator visited location and discussed the o owing activity. 1. The unit will be within 120' radius of65-S10 wellhead location. The WhisperGen unit gas supply and power impacts? line to 65-S-1 0 will be buried. A six foot by six foot concrete pad. moved from the test's previous location, will be placed on the ground as a base for the unit. 2. What is the legal location? 65-S-10

266

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

t~Lf§ t~Lf§ Project lnfonnation Project Title: T-2-11 Skim box reclamation Date: 10-S-09 DOE Code: Contractor Code: Project Lead: Terry Sullivan Project Overview We will dig around the cement box and cap or remove any pipes that are in the ground in the area. All of the 1. What are the environmental impacts? area we will be disturbing has already been dug up before ,so the impact to the invironment will be kept to a minimum. We will remove the cemant containment that is aproximatly six foot on all sides and take it to the 2. What is the legal location? cement pile behind the shop, or crush it and use it as backfill on location, at the descretion of the 3. What is the duration of the project? environmental dept. And backfill the hole with soil from the land farm that has been tested by the

267

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

SciTech Connect

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final decision by the New Mexico Environment Department (NMED), all alleged violations have been resolved without the assessment of fines or penalties. Non-mixed TRU waste shipments began on March 26, 1999. Shipments continued through November 26, 1999, the effective date of the Waste Isolation Pilot Plant Hazardous Waste Facility Permit (NM4890139088-TSDF). No shipments regulated under the Hazardous Waste Facility Permit were received at WIPP during this BECR reporting period.

Westinghouse TRU Solutions

2000-12-01T23:59:59.000Z

268

EPAct Transportation Regulatory Activities: Alternative Compliance for  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternative Compliance for State and Alternative Fuel Provider Fleets to someone by E-mail Share EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Facebook Tweet about EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Twitter Bookmark EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Google Bookmark EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Delicious Rank EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Digg Find More places to share EPAct Transportation Regulatory

269

Arsenic Epidemiology and Drinking Water Standards  

Science Journals Connector (OSTI)

...occurrences of arsenic in ground water." Dictionaries and...History, Study and Remediation is an Arsenic Project...also provided. The Ground Water and Drinking Water Division...resource page on arsenic in ground water of the United States...

Allan H. Smith; Peggy A. Lopipero; Michael N. Bates; Craig M. Steinmaus

2002-06-21T23:59:59.000Z

270

Environmental justice implications of arsenic contamination in California¿s San Joaquin Valley: a cross-sectional, cluster-design examining exposure and compliance in community drinking water systems  

E-Print Network (OSTI)

of Drinking Water and Environmental Management; 2008. 26.of Drinking Water and Environmental Management; 2008. 28.of Drinking Water and Environmental Management, CDPH), Dr.

Balazs, Carolina L; Morello-Frosch, Rachel; Hubbard, Alan E; Ray, Isha

2012-01-01T23:59:59.000Z

271

Environmental justice implications of arsenic contamination in California¿s San Joaquin Valley: a cross-sectional, cluster-design examining exposure and compliance in community drinking water systems  

E-Print Network (OSTI)

in community drinking water systems. Environmental Healthconcentrations in drinking water in Chile. Epidemiologyand enforcement of the safe drinking water act: The Arizona

Balazs, Carolina L; Morello-Frosch, Rachel; Hubbard, Alan E; Ray, Isha

2012-01-01T23:59:59.000Z

272

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

.S. Department of Energy Oak Ridge Operations Office to conduct its operations in compliance with federal, state, and best management practices. DOE and its contractors make every effort to conduct operations agreements, executive orders, DOE orders (as incorporated into the operating contracts), work smart standards

Pennycook, Steve

273

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

.S. Department of Energy (DOE) Oak Ridge Operations Office to conduct its operations in compliance with federal, settlement agreements, executive orders, DOE orders (as incorporated into the operating contracts), necessary and sufficient standards, and best management practices. DOE and its contractors make every effort to conduct

Pennycook, Steve

274

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

Security Administration (DOE-NNSA) policy to conduct its operations in compliance with federal, state, and best management practices. DOE and its contractors make every effort to conduct operations agreements, executive orders, DOE orders (as incorporated into the operating contracts), work smart standards

Pennycook, Steve

275

Environmental Compliance 2-1 2. Environmental Compliance  

E-Print Network (OSTI)

Nuclear Security Administration (DOE-NNSA) policy to conduct its operations in compliance with federal, settlement agreements, executive orders, DOE orders (as incorporated into the operating contracts), work smart standards, and best management practices. DOE and its contractors make every effort to conduct

Pennycook, Steve

276

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Project lnfonnation Project Title: Glori Oil-Biotechnology EOR Date: 2-4-10 DOE Code: 6730-020-51132 Contrac tor Code: 8067-757 Project Lead: Mark Duletsky Project Overview This is a proposal to place a water line from the water haul tank to 21-1 6-sx-2. The waterline will be buried 1. What are the environmental impacts? following an existing right of way to the road and then tum and be place in the roadway to the 21 16 sx-2 location. 2. What is the legal location? 3. What is the duration of the project? There will be a minor amount of surface disturbance involed in the project during trenching operations for the 4. What major equipment will be used pipeline. The area will be reclaimed after the pipeline is completed. if any (work over rig, drilling rig,

277

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project Informa t ion Proj ect Title: Restoration South of 54-TPX-1 0 Date : 2-8-1 0 DOE Code : Contractor Code: Project Lead: Jeff Jones Project Ove rview We will be digging contaminated soil out of the ground just to the south of 54-TPX-10. We will be taking all 1. What are the enwonmental 1 mpacts? contaminated soil to the land farm and entering the tot. ats in the log. We will backfill with clean fill dirt from Sec.20. 2. What is the legal location? 3. What is the duration of the project? The dura~Jon should be no longer than 4-6 days T 4 What major equipment will be used if any (work over rig, drilling rig, The equipment to be used is as follows Backhoe. dump truck. Tiller. etc.)? Aller all contaminated soil is removed and fresh fill has been placed we will t\11 the area and seed with native

278

The College Station Residential Energy Compliance Code  

E-Print Network (OSTI)

The City of College Station, Texas adopted a new residential Energy Compliance Code in January, 1988. The code, which strengthens compliance requirements in several areas, has received broadly based support and acceptance from all major constituent...

Claridge, D. E.; Schrock, D.

1988-01-01T23:59:59.000Z

279

BUILDING TECHNOLOGIES PROGRAM Iowa Compliance Implementation  

NLE Websites -- All DOE Office Websites (Extended Search)

Iowa Iowa Compliance Implementation and Evaluation (CIE) Guide COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 2 This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings. COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 3 Iowa WHAT'S INSIDE CIE Guide Overview-Flow Diagram ........................................................................................................................... 5 PART 1: Guide Overview .................................................................................................................................................

280

Code Compliance Technical Meeting: Building Technologies Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Compliance Technical Meeting: Building Technologies Office Department of Energy Washington, DC APRIL 2013 1 Welcome Welcome to The Building Technologies Office's Code Compliance Technical Meeting and to Washington, DC. On behalf of the Department of Energy Building Technology Office (BTO), we would like to thank you for attending, for your participation. The goal of this meeting is to review and discuss ongoing projects and existing activities that improve compliance with model energy codes. DOE

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

WICF Certification, Compliance and Enforcement webinar | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Certification, Compliance, and Enforcement Overview for Refrigerators, Refrigerator-Freezers, Freezers, Dehumidifiers, Room Air Conditioners, Clothes Washers, Clothes...

282

Pushing using Compliance Dennis Nieuwenhuisen  

E-Print Network (OSTI)

, but also exploits the power of compliance. 1 Introduction Over the years various techniques have been developed that address the problem of navigating through or interacting with a real or virtual world by an autonomous robot. An example of manipulation is a robot arm in a manufacturing plant that needs to insert

Utrecht, Universiteit

283

COMPLIANCE FORMS SUMMARY APPENDIX A  

E-Print Network (OSTI)

of these phases are described below. Building Permit Phase Documentation The Standards Section 10-103(a) requires specifications needed for new construction compliance, including HVAC capacity and the results of the heating and cooling load calculations need to be to be attached. The Standards require that a certificate

284

Threat Insight Quarterly Regulatory Compliance  

E-Print Network (OSTI)

X-Force ® Threat Insight Quarterly Regulatory Compliance www.iss.netwww.iss.net October 2006 #12 Risk Index ..............................................11 Future X-Force Threat Insight Quarterly Internet Security Systems X-Force® Threat Insight Quarterly > October 2006 ©2006 Internet Security Systems

285

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1" .J(p(p 1" .J(p(p Project lnfonnation Project Title: Geothermal Technologies Program Da te: 12/8/09 DOE Code: 6730.020.61041 Contractor Code: 8067-731 Project Lead: Lyle Johnson Project Overview This wor1< will consist of the laying of two pipelines to complete the construction of a low temperature 1. What are the environmental impacts? geothermal testing facility at the t>M/F building in Section 21 . The first line will.re a 250 feet long. 6 inch steel line from well17 WX 21 to the building. This line will provide hot Madison water to the facility. The 2. What is the legal location? second line will be a 250 feet long 1 0 inch steel line to return the cooling water and excess Madison to the 3. What is the duration of the project? Teapot Creek drainage. This line will terminate on a cement slab * a stone pile or a combination of botn to

286

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Project Information Project Title: Colvert replacement near 81-66-sx-15 Date: 10-19-09 DOE Code: Contractor Code: Project Lead: Bone -Wes Reisland Project Overview 1. What are the environmental We have a drainage problem with this colvert near 81-66-SX15 , and have tried to blast it out with a water impacts? from a fire hose to no avail. We think that it is colapsed in the middle. The environmental impact should be very small from digging the colvert out and replacing it. The job should take no longer than one day and will 2. What is the legal location? require two men a backhoe and picker truck to complete. The colvert will be replaced. Any contaminated 3. What is the duration of the project? soils will be replaced with fresh soil. The area for equipment will be restricted to the road and the imediant

287

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Project lnfonnation Project Title: Geothennal Technologies Program Date: 12-11-09 DOE Code: 6730.020.61041 Contractor Code: Project Lead: Lyle Johnson Project Overview This NEPA is for the laying of a 350 foot. 8" welded plastic water line from the lower cooling pond at the 1. What are the environmental Tensleep battery to a location between the 5,000 bbl tank and the top pond at the Tensleep battery. The impacts? entire project area is within Section 10 T39N R78VV (map attached) and will not impact any wet land areas. 2. What is the legal location? The project will include the clearing of sparse vegetation from a 12 foot wide construction corridor along the 3. What is the duration of the project? route, digging a 5 foot deep trench. welding and placing the plastic line and covering and compacting the

288

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cementing Swivel Test Cementing Swivel Test Da te: 6-23-2010 DOE Code: 6730-020-71094 Contractor Code: 8067-779 Project Lead: Mark Duletsky Project Overview 1. Brief project description [include The test will check the longevity of BJ Services cementing head elements. The test will be conducted on an anything that could impact the existing location, using an existing well in a recirculating flowline. The test will consist of tying cementing environment) head into mud system, rotating and circulating mud until 100 hours have elapsed or element failure. Potential exists for drilling mud leak from flowline. 2. Legal location 3. Duration of the project 45-3-X-21 , NE Y. SW Y. Section 21 Township 39 North Range 78 West 4. Major equipment to be used 5days Drilling rig , forklift, winch truck, water truck

289

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project lnfonnat ion Project Title: Geothermal Technologies Program - ORMAT Generator Date: 10-22-09 DOE Code: 6730.020.61041 Contractor Code: 8067-731 Project Lead: Lyle Johnson Project Overview 1. What are the environmental This NEPA is for the existing ORMAT geothermal processing unit that was used for testing during CRADA impacts? No 2007-083. The Original project consisted of the installation and 1 year testing of the binary geothermal power unit at the Tensleep battery using the hot produced water source as the heat medium. The unit is 2. What is the legal location? connected to the field electrical system for dissipation of the produced energy that is metered and monitored 3. What is the duration of the project? for reliability and quality. It is planned for the unit to remain in place so that an additional approximately 2.5

290

NPT Compliance | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Compliance | National Nuclear Security Administration Compliance | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog NPT Compliance Home > Our Mission > Managing the Stockpile > NPT Compliance NPT Compliance Maintaining the safety, security and effectiveness of the nuclear deterrent without nuclear testing - especially at lower numbers - requires

291

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WS' ~S5 WS' ~S5 Project Informa tion Proje ct Title: ESP ShuttleS Date: 11-23-09 DOE Code: 71086 Contrac tor Code : 8067-737 Project Lead: fr~V.. Project Ove rview We will be circulatlng water from a cased hole with a plug on bottom. to surface tanks, and back downhole. 1. What are the environmental impacts? A closed system. Frac Master tanks, a generator. esp power equipment and surface plumbing will be in place temporarily. There will be daily traffic for a 2 week period during testing. 2. What is the legaf location? 3. What is the duration of the project? Weii56-LX(MX)-1 0 in the SW SE of sec 10, T38N, R78W 4. What major equipment will be used if any (work over rig, drilling ng., 2Weeks etc.)? Work over rig, smeal,generator, forklift. The table below is to be completed by the Project Lead and reviewed by the Environme

292

Federal Energy Management Program: EISA Compliance Tracking System Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data EISA 432 Overview EISA requires Federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each Federal agency must designate an energy manager responsible for implementing the requirements at each covered facility. Comprehensive energy and water evaluations are to be performed at each covered facility every four years to identify potential energy and water efficiency and conservation measures. EISA requires agencies to report progress toward these requirements in CTS, along with: Estimated cost and savings for projects implemented in covered facilities Measured savings for implemented projects

293

Compliance, Certification and Enforcement for US Appliance and Equipment Energy Efficiency Programs by US DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance, Certification and Enforcement Compliance, Certification and Enforcement for US Appliance and Equipment Energy Efficiency Programs by US DOE As the Department of Energy is ramping up its focus on energy-efficiency, the Office of the General Counsel is stepping up enforcement and verification efforts to ensure manufacturers meet the energy and water conservation standards expected of them and save energy for American consumers and businesses. Recent enforcement initiatives go beyond compliance with energy-efficiency standards. We are working to protect consumers through verification and supporting the enforcement of Energy Star specifications to ensure that manufacturers offer the energy savings they advertise. Enforcement initiatives include: * Conservation Standards Enforcement

294

September 2004 Water Sampling  

Office of Legacy Management (LM)

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Water Elevation (ft) Date Falls City Disposal Site Groundwater Compliance...

295

ENVIRONMENTAL COMPLIANCE QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Environmental Compliance Qualification Standard Reference Guide DECEMBER 2011 Table of Contents i LIST OF FIGURES ..................................................................................................................... iii LIST OF TABLES ....................................................................................................................... iii ACRONYMS ................................................................................................................................ iv PURPOSE ...................................................................................................................................... 1 SCOPE ........................................................................................................................................... 1

296

DOE NEPA Compliance Officers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. NCODirectory100214.pdf More Documents &...

297

Automated Security Compliance Tool for the Cloud.  

E-Print Network (OSTI)

?? Security, especially security compliance, is a major concern that is slowing down the large scale adoption of cloud computing in the enterprise environment. Business… (more)

Ullah, Kazi Wali

2012-01-01T23:59:59.000Z

298

Section 15: Content of Compliance Recertification Application...  

NLE Websites -- All DOE Office Websites (Extended Search)

Content of Compliance Recertification Application(s) (40 CFR 194.15) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico...

299

Nebraska Water Conference Council's Annual Water & Natural Resources Tour  

E-Print Network (OSTI)

in the Platte River valley and ground water contamination in southwestern Grand Island. ` The ongoing drought cycle. Ground water level changes and related ground water/surface water interaction research-owned water wells. Cleanup and remediation efforts will be discussed by Gary Mader, Utilities Director, City

Nebraska-Lincoln, University of

300

Warm or Steaming Ground | Open Energy Information  

Open Energy Info (EERE)

Warm or Steaming Ground Warm or Steaming Ground Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Warm or Steaming Ground Dictionary.png Warm or Steaming Ground: An area where geothermal heat is conducted to the earth's surface, warming the ground and sometimes causing steam to form when water is present. Other definitions:Wikipedia Reegle Modern Geothermal Features Typical list of modern geothermal features Hot Springs Fumaroles Warm or Steaming Ground Mudpots, Mud Pools, or Mud Volcanoes Geysers Blind Geothermal System Steam rising from the ground at Eldvorp, a 10 km row of craters, in Southwestern Iceland. http://www.visiticeland.com/SearchResults/Attraction/eldvorp Warm or steaming ground is often an indicator of a geothermal system beneath the surface. In some cases a geothermal system may not show any

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

3Compliance Status 2004 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

3-1 3Compliance Status 2004 SITE ENVIRONMENTAL REPORT DRAFT Brookhaven National Laboratory (BNL County Department of Health Services. Thirty reportable spills of petroleum products or antifreeze status #12;3-22004 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS DRAFT 3.2.2 New or Modified

302

Environmental Compliance Audit& Assessment Program Manual  

SciTech Connect

This document describes the elements, schedule, roles, and responsibilities of the Lawrence Berkeley National Laboratory (LBNL) Environmental Compliance Audit & Assessment Program (ECAAP). The ECAAP has been developed to meet the requirements of DOE Order 450.1A,1 and Executive Order 13423.2 These referenced Orders stipulate that government agencies must develop environmental compliance audit programs to monitor and improve compliance with environmental regulations. As stated specifically in the DOE Order, as a part of a DOE facility's Environmental Management System (EMS), 'An environmental compliance audit and review program that identifies compliance deficiencies and root causes of non-compliance' shall be developed and implemented. The ECAAP has also been developed to satisfy LBNL's institutional technical assurance assessment requirements promulgated in the Environment, Safety and Health (ES&H) Self-Assessment Program (LBNL/PUB-5344) and described by the ES&H Technical Assurance Program (TAP) Manual (LBNL/PUB-913E). The ES&H TAP Manual provides the framework for systematic reviews of ES&H programs with the intent to provide assurance that these programs comply with their guiding regulations, are effective, and are properly implemented. As required by the DOE and Executive Orders and by LBNL's TAP, the goal of the ECAAP is to identify environmental regulatory compliance deficiencies and to determine their respective causes. The ECAAP then provides a means of correcting any deficiencies identified, and leads to continually improving environmental compliance performance.

Thorson, Patrick; Baskin, David; Borglin, Ned; Fox, Robert; Wahl, Linnea; Hatayama, Howard; Pauer, Ronald

2009-03-13T23:59:59.000Z

303

Global Water Sustainability:  

Science Journals Connector (OSTI)

...Ground Water and Drinking Water EPA 816-R-04-003...oil and gas produced water treatment. Journal of Hazardous...92-99 Jurenka B (2007) Electrodialysis (ED) and Electrodialysis...usbr.gov/pmts/water/publications/reportpdfs...

Kelvin B. Gregory; Radisav D. Vidic; David A. Dzombak

304

POLICY GUIDANCE MEMORANDUM #35 Procedures for Compliance with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Procedures for Compliance with Nepotism and Misuse of Position POLICY GUIDANCE MEMORANDUM 35 Procedures for Compliance with Nepotism and Misuse of Position The purpose of this...

305

2014-04-17 DOE Certification, Compliance, and Enforcement Overview...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04-17 DOE Certification, Compliance, and Enforcement Overview for Plumbing Products 2014-04-17 DOE Certification, Compliance, and Enforcement Overview for Plumbing Products This...

306

DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regarding the Compliance Date for the Dehumidifier Test Procedure DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

307

Technical Assistance: Increasing Code Compliance - 2014 BTO Peer...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Assistance: Increasing Code Compliance - 2014 BTO Peer Review Technical Assistance: Increasing Code Compliance - 2014 BTO Peer Review Presenter: Rosemarie Bartlett,...

308

Energy Code Compliance and Enforcement Best Practices (Text Version...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Code Compliance and Enforcement Best Practices (Text Version) Energy Code Compliance and Enforcement Best Practices (Text Version) Curtis Framel: Good afternoon, and good...

309

II. GENERAL COMPLIANCE SUPPLEMENT INTRODUCTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A. ACTIVITIES ALLOWED OR UNALLOWED Compliance Requirements The specific requirements for activities allowed or unallowed are unique to each DOE Federal award or program and are found in the laws, regulations, and the provisions of contract or grant agreements pertaining to the program. In addition, ARRA has established a cross-cutting unallowable activity for all ARRA-funded awards. Pursuant to Section 1604 of ARRA, none of the funds appropriated or otherwise made available in ARRA may be used by any State or local government, or any private entity, for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool. Source of Governing Requirements The requirements for activities allowed or unallowed are contained in program legislation or, as

310

Part II, General Compliance Supplement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A. ACTIVITIES ALLOWED OR UNALLOWED Compliance Requirements The specific requirements for activities allowed or unallowed are unique to each DOE Federal award or program and are found in the laws, regulations, and the provisions of contract or grant agreements pertaining to the program. In addition, ARRA has established a cross-cutting unallowable activity for all ARRA-funded awards. Pursuant to Section 1604 of ARRA, none of the funds appropriated or otherwise made available in ARRA may be used by any State or local government, or any private entity, for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool. Source of Governing Requirements The requirements for activities allowed or unallowed are contained in program legislation or, as

311

South Valley Compliance Agreement Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Valley South Valley Agreement Name South Valley Superfund Site Interagency Agreement State New Mexico Agreement Type Compliance Agreement Legal Driver(s) CERCLA Scope Summary Interagency Agreement with the U.S. Air Force for payment of costs associated with the remediation of two operable units (the facility and San Jose 6) at the South Valley Superfund Site. Parties DOE; U.S. Air Force Date 9/26/1990 SCOPE * Set forth the actions required of the USAF and DOE to fulfill their respective responsibilities pursuant to the Settlement Agreement between DOE, USAF, and General Electric Company (8/29/1990). * Establish mechanism by which DOE will transfer, to a fund managed by the USAF, its share of the costs set forth in the Settlement Agreement. * Set forth each party's responsibilities and respective share of costs.

312

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

SciTech Connect

This Biennial Environmental Compliance Report (BECR) documents compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste. This BECR covers the reporting period from April 1, 2004, to March 31, 2006. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents United States (U.S.) Department of Energy (DOE) compliance with regulations and permits issued pursuant to the following: (1) Title 40 Code of Federal Regulations (CFR) Part 191, Subpart A, "Environmental Standards for Management and Storage"; (2) Clean Air Act (CAA) (42 United States Code [U.S.C.] §7401, et seq.); (3) Solid Waste Disposal Act (SWDA) (42 U.S.C. §§6901-6992, et seq.); (4) Safe Drinking Water Act (SDWA) (42 U.S.C. §§300f, et seq.); (5) Toxic Substances Control Act (TSCA) (15 U.S.C. §§2601, et seq.); (6) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§9601, et seq.); and all other federal and state of New Mexico laws pertaining to public health and safety or the environment.

Washington Regulatory and Environmental Services

2006-10-12T23:59:59.000Z

313

University of Connecticut Health Center (UCHC) Compliance Officers Committee  

E-Print Network (OSTI)

University of Connecticut Health Center (UCHC) Compliance Officers Committee Charter The Compliance of Connecticut Chief Audit, Compliance and Ethics Officer shall serve on the committee as ex officio as a non-voting member. The University of Connecticut Chief Audit, Compliance and Ethics Officer has appointed

Michel, Robert G.

314

EPA's Priorities for Clean Water Act Programs  

E-Print Network (OSTI)

, industrial, construction) Pesticide application to water Discharges from Vessels CWA 309 Enforcement; deter non- compliance on an industry-wide basis Aggressively go after pollution problems that make America's waters Expanding the conversation on environmentalism and working for environmental justice

Nebraska-Lincoln, University of

315

Environmental Compliance Performance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance » Environmental Compliance » Environmental Compliance Performance Environmental Compliance Performance Most Office of Environmental Management (EM) cleanup is being performed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) through Federal Facility Agreements as well as under the Resource Conservation and Recovery Act (RCRA) through various consent orders, agreements, and decrees with states. These agreements and orders identify milestones associated with cleanup actions and dates by which those milestones are to be met. DOE has approximately 40 agreements and orders in place with its State and Federal regulators dealing with EM's cleanup mission. Major enforceable milestones are those which have fixed, mandatory due dates and, in EM's view, represent cleanup progress. EM's senior

316

Aspects on damper-attachment compliance  

Science Journals Connector (OSTI)

This paper investigates how attachment compliance coming from mounting bushings or brackets affects damper efficiency. Analyses with a simple mass-spring-damper system show that compliance in damper-attachment points reduces the damper efficiency. If however vibration isolation of the mass is considered, it may be seen that compliance increases low frequency vibrations but reduces high frequency vibrations. Through analyses of this system, the relative damping ratio is studied as a function of excitation frequency and attachment stiffness. Numerical values of typical damper-attachment stiffness in heavy vehicles are furthermore obtained from both static finite element (FE) analysis of the chassis frame and from dynamic FE analysis of a tractor. The effect damper-attachment compliance has on vehicle behaviour is finally quantified with MBS simulations of a tractor semi trailer combination. It is found that attachment stiffness should be considered when simulating load cases containing high frequency inputs.

Peter Holen; Mathias Zellinger

2006-01-01T23:59:59.000Z

317

Utah Compliance Implementation and Evaluation Guide  

SciTech Connect

This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings.

Cole, Pamala C.

2012-08-30T23:59:59.000Z

318

Fracture compliance estimation using borehole tube waves  

E-Print Network (OSTI)

We tested two models, one for tube-wave generation and the other for tube-wave attenuation at a fracture intersecting a borehole that can be used to estimate fracture compliance, fracture aperture, and lateral extent. In ...

Bakku, Sudhish Kumar

319

Nevada Compliance Implementation and Evaluation Guide  

SciTech Connect

This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings.

Cole, Pamala C.

2012-08-30T23:59:59.000Z

320

Iowa Compliance Implementation and Evaluation Guide  

SciTech Connect

This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings.

Cole, Pamala C.

2012-09-04T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Business Models for Code Compliance | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Compliance Site Map Printable Version Development Adoption Compliance Basics Compliance Evaluation Software & Web Tools Regulations Resource Center Business Models for Code Compliance The U.S. Department of Energy is coordinating strategies and activities with companies, individuals, and government entities to demonstrate, quantify, and monetize energy code compliance and coordinate deployment at the local, state, and regional levels. Consumer Assurance through Code Compliance Energy efficiency measures in the buildings sector, if properly realized and captured, provide a tremendous opportunity to reduce energy consumption and expenditures. Yet currently there is a lack of assurance that buildings as designed realize the levels of energy efficiency established in the

322

Design Compliance Matrices to ANSI and OSHA  

SciTech Connect

U.S. Department of Energy Letter 98-SFD-028 requested Fluor Daniel Hanford, Inc. to provide clarifications as to compliance with ANSI 57.1, 57.2, 57.9, and 29 CFR 1910.179 (OSHA), in the form of an item-by-item compliance matrix, for the CSB. This Supporting Document contains Fluor Daniel, Inc.'s response for use by Fluor Daniel Hanford, Inc. regarding the clarifications requested by the U.S. Department of Energy.

BENDIXSEN, R.B.

2000-04-03T23:59:59.000Z

323

Intracavity Sensing via Compliance Voltage in an External Cavity Quantum Cascade Laser  

SciTech Connect

We demonstrate a technique for gas phase spectroscopy and sensing by detecting changes in compliance voltage of an external cavity quantum cascade laser due to intracavity absorption. The technique is characterized and used to measure the absorption spectrum of water vapor and Freon-134a.

Phillips, Mark C.; Taubman, Matthew S.

2012-07-01T23:59:59.000Z

324

Ground Electromagnetic Techniques | Open Energy Information  

Open Energy Info (EERE)

Ground Electromagnetic Techniques Ground Electromagnetic Techniques (Redirected from Ground Electromagnetic Methods) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Electromagnetic Techniques Details Activities (0) Areas (0) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Electrical Techniques Parent Exploration Technique: Electromagnetic Techniques Information Provided by Technique Lithology: Rock composition, mineral and clay content Stratigraphic/Structural: Detection of permeable pathways, fracture zones, faults Hydrological: Resistivity influenced by porosity, grain size distribution, permeability, fluid saturation, fluid type and phase state of the pore water Thermal: Resistivity influenced by temperature

325

EO 12088: Federal Compliance with Pollution Control Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

088-Federal Compliance with Pollution Control Standards 088-Federal Compliance with Pollution Control Standards SOURCE: The provisions of Executive Order 12088 of October 13,1978, appear at 43 FR 47707, 3 CFR, 1978 Comp., p. 243, unless otherwise noted. By the authority vested in me as President by the Constitution and statutes of the United States of America, including Section 22 of the Toxic Substances Control Act (15 U.S.C. 2621), Section 313 of the Federal Water Pollution Control Act, as amended (33 U.S.C. 1323), Section 1447 of the Public Health Service Act, as amended by the Safe Drinking Water Act (42 U.S.C. 300j-6), Section 118of the Clean Air Act, as amended (42 U.S.C. 7418(b)), Section 4 of the Noise Control Act of 1972 (42 U.S.C. 4903), Section 6001 of the Solid Waste Disposal Act, as amended (42 U.S.C. 6961), and Section 301 of Title 3 of the United

326

Treatability test of a stacked-tray air stripper for VOC in water  

SciTech Connect

A common strategy for hydraulic containment and mass removal at VOC contaminated sites is `pump and treat (P&T)`. In P&T operations, contaminated ground water is pumped from wells, treated above ground, and discharged. Many P&T remediation systems at VOC sites rely on air stripping technology because VOCs are easily transferred to the vapor phase. In stacked-tray air strippers, contaminated water is aerated while it flows down through a series of trays. System operations at LLNL are strictly regulated by the California and federal Environmental Protection Agencies (Cal/EPA and EPA), the Bay Area Air Quality Management District (BAAQMD), the California Regional Water Quality Control Board (RWQCB) and the Department of Toxic Substances Control (DTSC). These agencies set discharge limits, require performance monitoring, and assess penalties for non-compliance. National laboratories are also subject to scrutiny by the public and other government agencies. This extensive oversight makes it necessary to accurately predict field treatment performance at new extraction locations to ensure compliance with all requirements prior to facility activation. This paper presents treatability test results for a stacked- tray air stripper conducted at LLNL and compares them to the vendor`s modeling software results.

Pico, T., LLNL

1998-04-01T23:59:59.000Z

327

EPAct Transportation Regulatory Activities: Compliance Methods for State  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Methods for State and Alternative Fuel Provider Fleets to someone by E-mail Share EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Facebook Tweet about EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Twitter Bookmark EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Google Bookmark EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Delicious Rank EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Digg Find More places to share EPAct Transportation Regulatory

328

Ground Vibration Measurement  

Science Journals Connector (OSTI)

Measurement of ground vibration is important for checking of amplitudes of ... confirmation of efficiency of control measures of ground vibration. The properties of measuring instruments used can affect the resul...

Dr. Milutin Srbulov

2010-01-01T23:59:59.000Z

329

Ecological Monitoring and Compliance Program 2009 Report  

SciTech Connect

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

Dennis J. Hansen, David C. Anderson, Derek B. Hall, Paul D. Greger, and W. Kent Ostler

2010-07-13T23:59:59.000Z

330

Ecological Monitoring and Compliance Program 2008 Report  

SciTech Connect

The Ecological Monitoring and Compliance Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2008. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC).

Dennis J. Hansen, David C. Anderson, Derek B. Hall, Paul D. Greger, W. Kent Ostler

2009-04-30T23:59:59.000Z

331

Ecological Monitoring and Compliance Program 2012 Report  

SciTech Connect

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2012. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). During 2012, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

Hall, Derek B.; Anderson, David C.; Greger, Paul D.; Ostler, W. Kent; Hansen, Dennis J.

2013-07-03T23:59:59.000Z

332

Conduct of Operations and Quality Assurance Compliance  

SciTech Connect

The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The ``Proposal for Reporting Conduct of Operations & Quality Assurance Compliance to DOE`` describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

Andrews, N.S.

1992-06-01T23:59:59.000Z

333

Conduct of Operations and Quality Assurance Compliance  

SciTech Connect

The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The Proposal for Reporting Conduct of Operations Quality Assurance Compliance to DOE'' describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

Andrews, N.S.

1992-06-01T23:59:59.000Z

334

Federal Energy Management Program: EISA Compliance Tracking System Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

EISA Compliance EISA Compliance Tracking System Reports and Data to someone by E-mail Share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Facebook Tweet about Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Twitter Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Google Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Delicious Rank Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Digg Find More places to share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules

335

Department of Energy - Office of NEPA Policy and Compliance ...  

Open Energy Info (EERE)

Policy and Compliance Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Department of Energy - Office of NEPA Policy and Compliance Abstract This website...

336

Alternative Compliance Program: 10 CFR Part 490 (Presentation)  

SciTech Connect

Presentation explains the Alternative Compliance option under the U.S. Department of Energy's State and Alternative Fuel Provider program.

Sears, T.

2008-10-01T23:59:59.000Z

337

Ecological Monitoring and Compliance Program 2007 Report  

SciTech Connect

In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

Dennis Hansen, David Anderson, Derek Hall, Paul Greger, W. Kent Ostler

2008-03-01T23:59:59.000Z

338

Compliance Status 2012 SITE ENVIRONMENTAL REPORT  

E-Print Network (OSTI)

dioxide from the Central Steam Facility were all within permit limits. There were nine unexpected opacity was submitted to address the non-compliance findings. Emissions of nitrogen oxides, carbon monoxide, and sulfur of the light path brought recorded opacity readings back to normal; other opacity excursions reported

339

Rocky Flats Compliance Program; Technology summary  

SciTech Connect

The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE`s strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP.

NONE

1994-02-01T23:59:59.000Z

340

PCI Compliance: Understand and Implement Effective PCI Data Security Standard Compliance, 2nd edition  

Science Journals Connector (OSTI)

Identity theft and other confidential information theft have now topped the charts as the #1 cybercrime. In particular, credit card data is preferred by cybercriminals. Is your payment processing secure and compliant? Now in its second edition, PCI Compliance ...

Anton Chuvakin; Branden R. Williams

2009-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

COMPLIANCE SUMMARY 1997 BNL Site Environmental Report 2 -1  

E-Print Network (OSTI)

COMPLIANCE SUMMARY 1997 BNL Site Environmental Report 2 - 1 Chapter 2 COMPLIANCE SUMMARY regulations and DOE Orders. This section briefly summarizes the compliance status for existing facilities to regulatory permits. They include one SPDES permit, a Major Petroleum Facility (MPF) license, two Resource

342

The effects of ankle compliance and flexibility on ankle sprains  

E-Print Network (OSTI)

The effects of ankle compliance and flexibility on ankle sprains IAN C. WRIGHT, RICHARD R. NEPTUNE. J VAN DEN BOGERT, and B. M. NIGG. The effects of ankle compliance and flexibility on ankle sprains was to examine the influence of changes in subtalar joint flexibility and compliance on ankle sprain occurrence

343

Ground Electromagnetic Techniques | Open Energy Information  

Open Energy Info (EERE)

Ground Electromagnetic Techniques Ground Electromagnetic Techniques Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Electromagnetic Techniques Details Activities (0) Areas (0) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Electrical Techniques Parent Exploration Technique: Electromagnetic Techniques Information Provided by Technique Lithology: Rock composition, mineral and clay content Stratigraphic/Structural: Detection of permeable pathways, fracture zones, faults Hydrological: Resistivity influenced by porosity, grain size distribution, permeability, fluid saturation, fluid type and phase state of the pore water Thermal: Resistivity influenced by temperature Dictionary.png

344

Environmental Compliance Performance Scorecard - First Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - First Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2013 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Third

345

Environmental Compliance Performance Scorecard - Third Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Third Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011

346

Environmental Compliance Performance Scorecard - First Quarter FY2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Environmental Compliance Performance Scorecard - First Quarter FY2013 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2013 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2010

347

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2012

348

Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

349

Monitoring, Verification and Reporting: Improving Compliance Within Energy  

Open Energy Info (EERE)

Monitoring, Verification and Reporting: Improving Compliance Within Energy Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Jump to: navigation, search Tool Summary Name: Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Agency/Company /Organization: International Energy Agency Sector: Energy Focus Area: Energy Efficiency Topics: GHG inventory, Policies/deployment programs Resource Type: Guide/manual Website: www.iea.org/papers/pathways/monitoring.pdf Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Screenshot References: Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs[1] This document includes: A brief overview of MVE in the context of S&L programmes.

350

FAQS Qualification Card - Environment Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environment Compliance Environment Compliance FAQS Qualification Card - Environment Compliance A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-EnvironmentalCompliance.docx Description Environment Compliance Qualification Card More Documents & Publications FAQS Qualification Card - Safeguards and Security General Technical Base

351

Environmental Compliance Performance Scorecard - Third Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Third Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

352

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2010

353

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First

354

Environmental Compliance Performance Scorecard - Second Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Second Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009

355

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010 Environmental Compliance Performance Scorecard - First Quarter FY2011

356

Environmental Compliance Performance Scorecard - Third Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Third Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

357

Joint full-waveform analysis of off-ground zero-offset ground penetrating radar and electromagnetic induction synthetic data for estimating soil electrical properties  

Science Journals Connector (OSTI)

......produces much of our water resources, supports...processes that govern water resources and quality...sustainability, exploitation and remediation strategies. Amongst...geophysical techniques, ground penetrating radar (GPR...dielectric permittivity of water overwhelms the permittivity......

D. Moghadas; F. André; E. C. Slob; H. Vereecken; S. Lambot

2010-09-01T23:59:59.000Z

358

Substation grounding optimization.  

E-Print Network (OSTI)

??Substation grounding is a critical part of the overall electric power system. It is designed to not only provide a path to dissipate electric currents… (more)

Balev, Vadim

2014-01-01T23:59:59.000Z

359

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 3, is a users manual and an installation and validation manual for the computer program SGSYS (Substation Grounding SYStem Analysis Program). This program analyzes the substation ground field given the total electric current injected into the ground field and the design of the grounding system. Standard outputs of the program are (1) total ground resistance, (2) step voltage, (3) touch voltage, (4) voltages on a grid of points, (5) voltage profile along straight lines, (6) transfer voltages, (7) ground potential rise, (8) body currents, (9) step voltage profile along straight lines, and (10) touch voltage profile along straight lines. This program can be utilized in an interactive or batch mode. In the interactive mode, the user defines the grounding system geometry, soil parameters, and output requests interactively, with the use of a user friendly conversational program. The users manual describes data requirements and data preparation procedures. An appendix provides forms which facilitate data collection procedures. The installation and validation manual describes the computer files which make up the program SGSYS and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

360

Compliance with Energy Codes | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance with Energy Codes Compliance with Energy Codes Energy code compliance must be achieved to realize the considerable benefits inherent in energy codes. BECP supports successful compliance by making no-cost compliance tools, REScheck(tm) and COMcheck(tm), and other resources widely available to everyone. BECP has also developed several resources to help states uniformly assess the rate of compliance with their energy codes for residential and commercial buildings. It is important to note that regardless of the level of enforcement, as a law the building owner/developer is ultimately responsible to comply with the energy code. Compliance will be increased if the adopting agency prepares the building construction community to comply with the energy code and provides resources to code officials to enforce it.

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

New and Underutilized Technology: Commercial Ground Source Heat Pumps |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Ground Source Heat Commercial Ground Source Heat Pumps New and Underutilized Technology: Commercial Ground Source Heat Pumps October 8, 2013 - 2:59pm Addthis The following information outlines key deployment considerations for commercial ground source heat pumps within the Federal sector. Benefits Commercial ground source heat pumps are ground source heat pump with loops that feed multiple packaged heat pumps and a single ground source water loop. Unit capacity is typically 1-10 tons and may be utilized in an array of multiple units to serve a large load. Application Condensing boilers are appropriate for housing, service, office, and research and development applications. Key Factors for Deployment FEMP has made great progress with commercial ground source heat pump technology deployment within the Federal sector. Primary barriers deal with

362

Burbank Water and Power SBX1 2 Compliance Plan  

E-Print Network (OSTI)

impact hydroelectric generation, digester gas, municipal solid waste, landfill gas, ocean wave, ocean

363

FAQS Job Task Analyses - Environmental Compliance FAQS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Compliance Functional Area Qualification Standard Environmental Compliance Functional Area Qualification Standard DOE-STD-1156-2011 Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks

364

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. It can be used to compute transient ground potential rise due to lightning or switching, and the ground impedance (i.e. resistance and reactance) at specified frequencies. This report, Volume 4, is a users manual and an installation and validation manual for the computer program TGRND (Transient GRouNDing System Analysis Program). This program computes transient ground potential rise resulting from lightning, switching, or other transient electric currents injected to a grounding system. The program also computes the impedance (i.e. resistance and reactance) of a grounding system as a function of frequency. This program can be utilized in an interactive or batch mode. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program TGRND and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

365

Ground Motion Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

2nd Advanced ICFA Beam Dynamics Workshop 2nd Advanced ICFA Beam Dynamics Workshop on Ground Motion in Future Accelerators November 6 - 9, 2000 SLAC Coordinators: Andrei Seryi & Tor Raubenheimer Proceedings Updated June 26, 2001 Agenda and Presentations Workshop photos Summaries Useful links Poster Goals Introduction to the problems Structure Registration Registered participants Committees Location, Accommodations and Travel Workshop on Ground Motion in Future Accelerators A workshop was held at SLAC that was devoted to ground motion and its effects on future accelerators. Ground motion and vibration can be a limiting effect in synchrotron light sources, hadron circular colliders, and electron/positron linear colliders. Over the last several years, there has been significant progress in the understanding of the ground motion and its effects, however, there are

366

Water Scarcity, Climate Change, and Water Quality: Three Economic Essays  

E-Print Network (OSTI)

essays by implicitly incorporating uncertainty about future climate, water demand from all types of water use, a spatial river flow relationship, interaction between ground and surface water, institutional regulations, and the possibilities of inter-basin...

Cai, Yongxia

2010-07-14T23:59:59.000Z

367

The COMPLY computer program for demonstrating compliance with national radionuclide air emission standards  

SciTech Connect

The Environmental Protection Agency (EPA) has proposed national radionuclide air emission standards for a number of source categories. One of these standards applies to Nuclear Regulatory Commission Licensees and non-Department of Energy facilities having the potential to release radionuclides to the atmosphere. Approximately 6000 facilities are subject to the standard, which limits the effective whole-body dose commitment to the maximally exposed individual from radionuclide releases to the atmosphere. A computer program to assist the regulated community in determining compliance has been developed by the EPA's Office of Radiation Programs. The computer program COMPLY calculates the dose to an individual residing outside the facility. The program considers dose from inhalation, ingestion of contaminated food, air immersion, and ground deposition. It is based on models developed by the National Council on Radiation Protection and Measurements (NCRP). Compliance procedures provided in COMPLY are designed to reduce the burden on the regulated community. The approach begins with simple-to-use methods that are very conservative in determining compliance. The methods become progressively less conservative but more complicated at succeeding levels. Each higher level requires the input of site-specific information, but allows a more realistic estimate of dose. This paper describes the COMPLY program, and provides estimates of the work required and the degree of conservatism in the dose computed at each level.

Colli, A.; Beal, S.; Loomis, D. (Environmental Protection Agency, Washington, DC (USA))

1990-04-01T23:59:59.000Z

368

Shale gas development impacts on surface water quality in Pennsylvania  

Science Journals Connector (OSTI)

...fractured shale aquifers . Ground Water 50 ( 6 ): 826 – 828...2011) Investigation of Ground Water Contamination near Pavillion...poses a threat to surface waters. Front Ecol Environ...Acid mine drainage remediation options: A review...

Sheila M. Olmstead; Lucija A. Muehlenbachs; Jhih-Shyang Shih; Ziyan Chu; Alan J. Krupnick

2013-01-01T23:59:59.000Z

369

Appliance Standards Update and Review of Certification, Compliance and Enforcement Powerpoint Presentation for ASHRAE Conference, January 31, 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Buildings Regulatory Program Buildings Regulatory Program Buildings Regulatory Program Appliance Standards Update and Review of Certification, Compliance and Enforcement John Cymbalsky, Ashley Armstrong, and Laura Barhydt US Department of Energy January 31, 2011 Presentation Outline Presentation Outline * Upcoming Relevant Rulemakings * Changes to Rulemaking Process * Executive Order 13563 * Overview of Compliance, Certification, and Enforcement * Detailed Questions and Answers 2 | U.S. Department of Energy energy.gov Long Term Schedules for Certain HVAC Rulemakings Long Term Schedules for Certain HVAC Rulemakings Appliance Standards Product Categories Driver Approx. Rule Initiation Date Final Action Date Heating Products Rulemakings Residential Water Heaters, Direct Heating Equipment, and Pool

370

Appliance Standards Update and Review of Certification, Compliance and Enforcement Powerpoint Presentation for ASHRAE Conference, January 31, 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Buildings Regulatory Program Buildings Regulatory Program Buildings Regulatory Program Appliance Standards Update and Review of Certification, Compliance and Enforcement John Cymbalsky, Ashley Armstrong, and Laura Barhydt US Department of Energy January 31, 2011 Presentation Outline Presentation Outline * Upcoming Relevant Rulemakings * Changes to Rulemaking Process * Executive Order 13563 * Overview of Compliance, Certification, and Enforcement * Detailed Questions and Answers 2 | U.S. Department of Energy energy.gov Long Term Schedules for Certain HVAC Rulemakings Long Term Schedules for Certain HVAC Rulemakings Appliance Standards Product Categories Driver Approx. Rule Initiation Date Final Action Date Heating Products Rulemakings Residential Water Heaters, Direct Heating Equipment, and Pool

371

Los Alamos National Laboratory Compliance Order, October 4, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Facility Compliance Order Federal Facility Compliance Order State New Mexico Agreement Type Compliance Agreement Legal Driver(s) New Mexico Hazardous Waste Act (NMHWA)/ FFCAct /RCRA Scope Summary Require compliance with a Site Treatment Plan for the treatment of mixed waste at Los Alamos National Lab. Parties DOE; University of California; New Mexico Environment Department Date 10/04/1995 SCOPE * Require compliance with a Site Treatment Plan for the treatment of mixed waste at Los Alamos National Lab. * Bring the Los Alamos National Lab into compliance with the requirements for the storage and treatment of mixed waste under RCRA and the NMHWA. * Establish that DOE and the University of California have both joint and several liability for meeting the conditions of the agreement.

372

40 ELR 11106 ENVIRONMENTAL LAW REPORTER 11-2010 Gaining Ground: Wetlands,  

E-Print Network (OSTI)

40 ELR 11106 ENVIRONMENTAL LAW REPORTER 11-2010 Gaining Ground: Wetlands, Hurricanes .5% dis- count rate). Marine waters, wetlands, swamps, agricultural lands, and forests provide natural goods and services . The 1 . David Batker et al ., Gaining Ground: Wetlands, Hurricanes

Vermont, University of

373

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 2, is a users manual and an installation and validation manual for the computer program SMECC (Substation Maximum Earth Current Computation Program). This program analyzes the electric current distribution among grounded structures inside and outside a substation for different fault conditions. The fault conditions are automatically selected by the program, or they may be specified by the user, or both. The fault condition resulting in maximum substation earth current is identified and reported. Data requirements for this program are: ground impedance, transformer data, transmission line data, transmission line grounding impedances, etc. The program provides four types of standard outputs: (1) a report of voltages and current flow in the unfaulted system, (2) a brief report of the maximum ground potential rise (worst fault condition), (3) a summary report of all fault conditions which have been analyzed by the program, and (4) a detailed report of voltages and current flow for a selected set of fault conditions.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

374

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2009 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

375

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012

376

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

377

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2011 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010

378

Lighting Development, Adoption, and Compliance Guide BUILDING TECHNOLOGIES PROGRAM I  

NLE Websites -- All DOE Office Websites (Extended Search)

Lighting Development, Adoption, and Compliance Guide BUILDING TECHNOLOGIES PROGRAM I Lighting Development, Adoption, and Compliance Guide BUILDING TECHNOLOGIES PROGRAM I Lighting BUILDING TECHNOLOGIES PROGRAM Development, Adoption, and Compliance Guide Lighting BUILDING TECHNOLOGIES PROGRAM September 2012 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 | PNNL-SA-90653 Development, Adoption, and Compliance Guide 3.3 Exterior Lighting Controls ...........................................................................24 3.3.1 Dusk to Dawn Controls ...............................................................................25 3.3.2 Lighting Power Reduction Controls ........................................................25 3.3.3 Parking Garage Controls ............................................................................26

379

Exploring Partnerships to Further Building Code Compliance Enhancement  

Energy.gov (U.S. Department of Energy (DOE))

This presentation, given through the DOE's Technical Assitance Program (TAP), identifies opportunities for municipal and state partnerships to ensure better building code compliance.

380

Perception of petroleum profits tax compliance in Nigeria.  

E-Print Network (OSTI)

??The aim of this research is to examine whether the extent of tax compliance by oil producing companies in Nigeria is determined by the knowledge,… (more)

Oremade, Babatunde Timothy

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

State and Alternative Fuel Provider Fleet Compliance Methods (Revised) (Brochure)  

SciTech Connect

This fact sheet describes the difference between Standard and Alternative Compliance requirements for state and alternative fuel provider fleets covered by the Energy Policy Act.

Not Available

2014-03-01T23:59:59.000Z

382

CHP: A Technical & Economic Compliance Strategy - SEE Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Webinar, January 2012 This presentation, "IndustrialCommercialInstitutional Boiler MACT - Combined Heat and Power: A Technical & Economic Compliance Strategy," by John...

383

2014-10-06 DOE Certification, Compliance, and Enforcement Overview...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dehumidifiers, Room Air Conditioners, Clothes Washers, Clothes Dryers, and Dishwashers 2014-10-06 DOE Certification, Compliance, and Enforcement Overview for Refrigerators,...

384

Executive Vice President- Compliance, Audit, and Risk Management  

Energy.gov (U.S. Department of Energy (DOE))

This announcement has been amended to remove the requirement for a Department of Energy security clearance. Bonneville Power Administration's (BPA) compliance landscape continues to expand at a...

385

DOE Steps Lead to Significant Increase in Compliance with Energy...  

Office of Environmental Management (EM)

Department of Energy Subpoenas Compliance Data from AeroSys, Inc. DOE Requires Manufacturers to Halt Sales of Heat Pumps and Air Conditioners Violating Minimum Appliance Standards...

386

State and Alternative Fuel Provider Fleet Compliance Methods (Revised) (Brochure)  

SciTech Connect

Fact sheet describes the difference between Standard and Alternative Compliance requirements for state and alternative fuel provider fleets covered under the Energy Policy Acts of 1992 and 2005.

Not Available

2009-12-01T23:59:59.000Z

387

Environmental Protection- Industrial Compliance (Newfoundland and Labrador, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The Industrial Compliance Section develops and administers Certificates of Approval for the Construction and/or Operation of various industrial facilities. Industries with air emissions and/or...

388

Administrative Compliance Order HWB-14-21 Waste Isolation Pilot...  

Office of Environmental Management (EM)

issues this Administrative Compliance Order ("Order") to the United States Department of Energy ("DOE"), and Nuclear Waste Partnership, LLC ("NWP"; collectively, with DOE, the...

389

EPA - Permit Compliance System webpage | Open Energy Information  

Open Energy Info (EERE)

System webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Permit Compliance System webpage Abstract This webpage contains EPA's Permit...

390

Environmental Compliance Performance Scorecard - Second Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

391

Reforestation as a novel abatement and compliance measure for ground-level ozone  

Science Journals Connector (OSTI)

...aboveground C at year 30. Annual air pollution removal was greatest in year 23...underestimate total leaf area and air pollution removal during the later years...suggest that reforestation for air pollution abatement constitutes a potentially globally...

Timm Kroeger; Francisco J. Escobedo; José L. Hernandez; Sebastián Varela; Sonia Delphin; Jonathan R. B. Fisher; Janice Waldron

2014-01-01T23:59:59.000Z

392

Reforestation as a novel abatement and compliance measure for ground-level ozone  

Science Journals Connector (OSTI)

...processes and fuels (17); and...daily 8-h average) 2008 National...combustion controls (fuel switching...The net effect of a reforestation...the highest-price carbon...real offset prices will remain unchanged...represent the averages of the damage...the Greenhouse Effect; and Framework...

Timm Kroeger; Francisco J. Escobedo; José L. Hernandez; Sebastián Varela; Sonia Delphin; Jonathan R. B. Fisher; Janice Waldron

2014-01-01T23:59:59.000Z

393

Reforestation as a novel abatement and compliance measure for ground-level ozone  

Science Journals Connector (OSTI)

...disturbance events like drought, wildfire, pests and diseases, or hurricanes...Coast inland along the Brazos, Colorado, and St. Bernard Rivers...susceptible to drought and wildfire than upland forests (49...M Forest Service ( 2014 ) Wildfire risk assessment portal. Available...

Timm Kroeger; Francisco J. Escobedo; José L. Hernandez; Sebastián Varela; Sonia Delphin; Jonathan R. B. Fisher; Janice Waldron

2014-01-01T23:59:59.000Z

394

Reforestation as a novel abatement and compliance measure for ground-level ozone  

Science Journals Connector (OSTI)

...approaches to reduce emissions from fossil fuel combustion processes, implemented via command-and-control or market-based...shutdowns (16); conversion to lower-emitting combustion processes and fuels (17); and end-of-pipe controls...

Timm Kroeger; Francisco J. Escobedo; José L. Hernandez; Sebastián Varela; Sonia Delphin; Jonathan R. B. Fisher; Janice Waldron

2014-01-01T23:59:59.000Z

395

Environmental Compliance Audit & Assessment Program Manual  

E-Print Network (OSTI)

include: Storm Water Management Environmental Services DavidEnvironmental Management System Environmental Radiation Protection Environmental Restoration Hazardous Waste Fixed Treatment Units Storm WaterEnvironmental Management System Environmental Radiation Protection Environmental Restoration Hazardous Waste Fixed Treatment Units Storm Water

Thorson, Patrick

2009-01-01T23:59:59.000Z

396

Institute of Water Research Annual Technical Report  

E-Print Network (OSTI)

environmental problems presently facing the state of Michigan are surface and ground water quality management on research, and extended education programs on watershed management and surface and ground water protection transfer, urban water systems, water quality, water quality management, watershed management, wetlands

397

Environmental Compliance Functional Area Qualification Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56-2011 56-2011 June 2011 DOE STANDARD ENVIRONMENTAL COMPLIANCE FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; further dissemination unlimited. (Unclassified Unlimited) DOE-STD-1156-2011 ii This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE-STD-1156-2011 iv TABLE OF CONTENTS ACKNOWLEDGMENT v PURPOSE 1 APPLICABILITY 1 IMPLEMENTATION 2 EVALUATION REQUIREMENTS 3 INITIAL QUALIFICATION AND TRAINING 5

398

WICF Certification, Compliance and Enforcement webinar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WICF Testing, Certification, WICF Testing, Certification, Compliance, and Enforcement Overview August 30, 2011 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Agenda 2 Certified Ratings 3 1 Testing Basic Model Enforcement 4 5 Manufacturer How to Submit Questions 6 3 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer of a WICF * Is a domestic manufacturer or an importer. * Produces a component of a walk-in cooler or walk-in freezer that affects energy consumption, including, but not limited to, refrigeration, doors, lights, windows, or walls.

399

The Washington State Experience Energy Code Compliance  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington State Experience Washington State Experience Residential Energy Code Compliance Gary Nordeen Senior Building Science Specialist April 4, 2013 WSU Energy Program Provides energy services, products, education and information for: * Businesses * Utilities ̶ public and private * Governments ̶ state and local * Tribes * Federal agencies * Manufacturing plants * Educational facilities * National laboratories WSU Energy Program Building Science Team * Residential energy code technical assistance * Voluntary programs, Northwest ENERGYSTAR Homes * Research and development, Building America * Community-based upgrade programs * Industry training and certifications ̶ HERS, BPI, ENERGY STAR, PTCS Staff provides building science expertise for: WSU Energy Program

400

Arkansas Water Resources Center Annual Technical Report  

E-Print Network (OSTI)

) in cooperation with the US Geological Survey and the National Institutes for Water Resources has focused wastewater disposal systems, ground water modeling and land use mapping, water resource economics, water

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

2009 Compliance Recertification Application (2009 CRA) Compliance Application Review Document (CARD) No. 53  

E-Print Network (OSTI)

dissolved solids." The groundwater protection requirements limit releases to the maximum contamination level a bounding analysis of the concentrations of the contaminants to assess compliance (Subpart C of 40 CFR part is much less than the observed concentration of brine derived from the Salado anhydrite marker beds. Also

402

2009 Compliance Recertification Application (CRA-2009) Compliance Application Review Document (CARD) No. 23  

E-Print Network (OSTI)

the requirements for Section 194.23 (a)(1), EPA expected DOE's application to contain a complete, clear PA calculations. EPA found DOE in compliance with the requirements of Section 194.23 (a)(1 APPLICATION (CRA-2004 OR CRA04) (194.23(a)(1)) For the 2004 recertification DOE undertook an extensive

403

Breaking Ground in Miami-Dade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Breaking Ground in Miami-Dade Breaking Ground in Miami-Dade Breaking Ground in Miami-Dade October 15, 2010 - 4:28pm Addthis Existing Miami-Dade county water treatment facility. Existing Miami-Dade county water treatment facility. Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Officials from Miami-Dade County and the U.S. Department of Energy were on hand Wednesday, October 13th to formally break ground on an innovative project that will help improve the energy efficiency of one of the county's major water treatment facilities. The project will upgrade and expand the existing power generation system at the water plant which generates electricity from digester gas produced at the plant. Landfill gas, which is produced from the Solid Waste Department's South Dade Landfill, will be collected and piped across a

404

Regulatory treatment of allowances and compliance costs  

SciTech Connect

The Clean Air Act Amendments of 1990 (CAAA) established a national emission allowance trading system, a market-based form of environmental regulation designed to reduce and limit sulfur dioxide emissions. However, the allowance trading system is being applied primarily to an economically regulated electric utility industry. The combining of the new form of environmental regulation and economic regulation of electric utilities has raised a number of questions including what the role should be of the federal and state utility regulating commissions and how those actions will affect the decision making process of the utilities and the allowance market. There are several dimensions to the regulatory problems that commissions face. Allowances and utility compliance expenditures have implications for least-cost/IPR (integrated resource planning), prudence review procedures, holding company and multistate utility regulation and ratemaking treatment. The focus of this paper is on the ratemaking treatment. The following topics are covered: ratemaking treatment of allowances and compliance costs; Traditional cost-recovery mechanisms; limitations to the traditional approach; traditional approach and the allowance trading market; market-based cost recovery mechanisms; methods of determining the benchmark; determining the split between ratepayers and the utility; other regulatory approaches; limitations of incentive mechanisms.

Rose, K. [National Regulatory Research Institute, Columbus, OH (United States)

1993-07-01T23:59:59.000Z

405

COMPLIANCE STUDIES: WHAT ABOUT THE FISH?  

SciTech Connect

ABSTRACT It is understood that operational and structural conditions at hydroelectric facilities along with environmental conditions of the migration corridors affect the passage conditions for fish. Hydropower fish survival assessments at the individual- and population-level have progressed over the past decade with development of turbine simulation software and improvements in telemetry systems, in particular, micro-transmitters, cabled and autonomous receivers, and advanced statistical designs that provide precise estimates of passage routes and dam-passage survival. However, these approaches often ignore fish condition as a variable in passage and survival analyses. To account for fish condition effects on survival results, compliance statistical models often require increased numbers of tagged fish. For example, prior to and during migration, fish encounter numerous stressors (e.g., disease, predation, contact with structures, decompression events), all of which can cause physical and physiological stress, altering the probability of survival after passage through a dam or a series of dams. In addition, the effects of surgical transmitter implantation process or the transmitter itself may cause physiological stress, alter behavior, and/or decrease survival. Careful physiological evaluations can augment survival model assumptions, resultant data, and predictive scenarios. To exemplify this, surgeons concurrently noted fish condition and surgical implantation during a multi-dam compliance study in 2011. The analyses indicted that surgeon observations on fish condition and surgical outcomes were related to 24 h holding mortalities and fish that never detected after release. Short reach and long reach survival were related to surgical outcomes and fish condition, respectively.

Woodley, Christa M.; Fischer, Eric S.; Wagner, Katie A.; Weiland, Mark A.; Eppard, M. B.; Carlson, Thomas J.

2013-08-21T23:59:59.000Z

406

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

407

Ground-Based Microwave Radiometer Measurements  

NLE Websites -- All DOE Office Websites (Extended Search)

Ground-Based Microwave Radiometer Measurements Ground-Based Microwave Radiometer Measurements and Radiosonde Comparisons During the WVIOP2000 Field Experiment D. Cimini University of L'Aquila L'Aquil, Italy E. R. Westwater Cooperative Institute for Research in the Environmental Sciences University of Colorado National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado Y. Han Science System Applications National Aeronautics Space Administration Goddard Space Flight Center Greenbelt, Maryland S. Keihm Jet Propulsion Laboratory California Institute of Technology Pasadena, California Introduction During September to October 2000, a water vapor intensive operational period (WVIOP) was conducted at the Atmospheric Radiation Measurement (ARM) Program's Southern Great Plains (SGP) Cloud and

408

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

409

Ecological Monitoring and Compliance Program Fiscal Year 2003 Report  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

Bechtel Nevada

2003-12-01T23:59:59.000Z

410

RESEARCH ARTICLE Aerodynamic and functional consequences of wing compliance  

E-Print Network (OSTI)

RESEARCH ARTICLE Aerodynamic and functional consequences of wing compliance Andrew M. Mountcastle Ã?, the instantaneous shape of an insect wing is dictated by the interaction of aerodynamic forces with the inertial rever- sals--loads that well exceed the mean aerodynamic force. Although wing compliance has been

Daniel, Tom

411

SOUND COMPLIANCE MONITORING FOR THE GAMESA WIND TURBINE  

E-Print Network (OSTI)

SOUND COMPLIANCE MONITORING FOR THE GAMESA WIND TURBINE UD - LEWES, DELAWARE January 2011 ` #12;SOUND COMPLIANCE MONITORING FOR THE GAMESA WIND TURBINE AT THE UNIVERSITY OF DELAWARE LEWES, DELAWARE A Gamesa G90 2.0-MW wind turbine operates at the University of Delaware (UD), Lewes campus on a parcel

Firestone, Jeremy

412

Compliance Verification Paths for Residential and Commercial Energy Codes  

SciTech Connect

This report looks at different ways to verify energy code compliance and to ensure that the energy efficiency goals of an adopted document are achieved. Conformity assessment is the body of work that ensures compliance, including activities that can ensure residential and commercial buildings satisfy energy codes and standards. This report identifies and discusses conformity-assessment activities and provides guidance for conducting assessments.

Conover, David R.; Makela, Eric J.; Fannin, Jerica D.; Sullivan, Robin S.

2011-10-10T23:59:59.000Z

413

STATE OF CALIFORNIA CERTIFICATE OF COMPLIANCE, PRESCRIPTIVE HVAC ALTERATIONS  

E-Print Network (OSTI)

STATE OF CALIFORNIA CERTIFICATE OF COMPLIANCE, PRESCRIPTIVE HVAC ALTERATIONS CEC-MECH-1C-ALT-HVAC (Revised 07/10) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE MECH-1C-ALT-HVAC Prescriptive HVAC Steps" column below. Note: After installation of HVAC units and/or ducts, the Installation

414

Preliminary Comments on Compliance Plan and Request for Clarification or,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Compliance Plan and Request for Comments on Compliance Plan and Request for Clarification or, in the Alternative, Rehearing of the District of Columbia Public Service Commission Preliminary Comments on Compliance Plan and Request for Clarification or, in the Alternative, Rehearing of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-05-3, issued by the Department of Energy ("DOE") in the above-captioned docket on December 20, 2005 ("December 20 Order"), and Section 313 of the Federal Power Act ("FPA"), 16 U.S.C. § 8251, the District of Columbia Public Service Commission ("DCPSC") hereby submits its preliminary comments on the compliance plan ("Compliance Plan") proposed by MiranT Potomac River,

415

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 July 12, 2007 Issued to Los Alamos National Security, LLC related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory The Compliance Order directs LANS to implement specific corrective actions to remediate both the laboratory management deficiencies that contributed to the thumb drive security incident at Los Alamos National Laboratory (LANL) discovered in October 2006 and, more broadly, longstanding deficiencies in the classified information and cyber security programs at LANL. Violation of the Compliance Order would subject LANS to issuance of a notice of violation and assessment of civil penalties up to S100,000 per

416

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 July 12, 2007 Issued to Los Alamos National Security, LLC related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory The Compliance Order directs LANS to implement specific corrective actions to remediate both the laboratory management deficiencies that contributed to the thumb drive security incident at Los Alamos National Laboratory (LANL) discovered in October 2006 and, more broadly, longstanding deficiencies in the classified information and cyber security programs at LANL. Violation of the Compliance Order would subject LANS to issuance of a notice of violation and assessment of civil penalties up to S100,000 per

417

Oak Ridge Reservation Compliance Order, September 26, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reservation Compliance Order, September 26, 1995 Page 1 of 5 Reservation Compliance Order, September 26, 1995 Page 1 of 5 EM Home | Regulatory Compliance | Environmental Compliance Agreements Oak Ridge Reservation Compliance Order, September 26, 1995 STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION IN THE MATTER OF: ) ) ) DIVISION OF SOLID WASTE UNITED STATES DEPARTMENT OF ) MANAGEMENT ENERGY ) ) CASE NO. 95-0514 RESPONDENT ) Commissioner's Order NOW COMES Don Dills, Commissioner of the Department of Environment and Conservation, and states that: Table of Contents Parties Jurisdiction Facts Order Reservation of Rights Notice of Rights Parties I. Don Dills is the duly appointed Commissioner of the Tennessee Department of Environment and Conservation ("the Department"). II. The United States Department of Energy ("DOE")is a department, agency and instrumentality of the

418

EISA Compliance Tracking System Reports and Data | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data October 8, 2013 - 2:06pm Addthis The Federal Energy Management Program (FEMP) provides links to reports and data illustrating Federal progress in meeting the requirements outlined in Section 432 of the Energy Independence and Security Act of 2007 (EISA) (42 U.S.C. 8253(f)) available through the EISA 432 Compliance Tracking System (CTS). EISA 432 CTS Data Levels Top-tier agency aggregates, representing all reported data subject to the EISA 432 requirements Facility-level detailed data that excludes information for facilities that have requested exemption from public disclosure for national-security purposes. Access Data Federal Government Compliance Overview: View key CTS metrics and aggregates

419

Lab 10: Contaminated water and remediation Water on and in the Earth  

E-Print Network (OSTI)

Lab 10: Contaminated water and remediation Water on and in the Earth Where is Earth's water located that the vast majority of the fresh water available for our uses is stored in the ground (the large grey slice in ice and glaciers. Another 30 percent of freshwater is in the ground. Thus, surface-water sources (such

Li, X. Rong

420

Ground Gravity Survey | Open Energy Information  

Open Energy Info (EERE)

Ground Gravity Survey Ground Gravity Survey Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Gravity Survey Details Activities (48) Areas (34) Regions (2) NEPA(2) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Gravity Techniques Parent Exploration Technique: Gravity Techniques Information Provided by Technique Lithology: Distribution of density in the subsurface enables inference of rock type. Stratigraphic/Structural: Delineation of steeply dipping formations, geological discontinuities and faults, intrusions and large-scale deposition of silicates due to hydrothermal activity. Hydrological: Density of sedimentary rocks are strongly influenced by fluid contained within pore space. Dry bulk density refers to the rock with no moisture, while the wet bulk density accounts for water saturation; fluid content may alter density by up to 30%.(Sharma, 1997)

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

GRR/Section 19-CO-e - New Water Right Process for Surface Water and  

Open Energy Info (EERE)

19-CO-e - New Water Right Process for Surface Water and 19-CO-e - New Water Right Process for Surface Water and Tributary Ground Water < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-e - New Water Right Process for Surface Water and Tributary Ground Water 19COENewWaterRightProcessForSurfaceWaterAndTributaryGroundWater.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 19COENewWaterRightProcessForSurfaceWaterAndTributaryGroundWater.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Developers seeking a new water right to appropriate surface water and

422

Substation grounding programs  

SciTech Connect

The five volume report comprises the user manual, installation, and validation manual and an applications guide for the SGA (Substation Grounding Analysis) software package. SGA consists of four computer programs: (1) SOMIP, (2) SMECC, (3) SGSYS, and (4) TGRND. The first three programs provide a comprehensive analysis tool for the design of substation grounding systems to meet safety standards. The fourth program, TGRND, provides a state of the art analysis tool for computing transient ground potential rise and ground system impedance. This part of the report, Volume 1, is a users manual and an installation and validation manual for the computer program SOMIP (SOil Measurement Interpretation Program). This program computes the best estimate of the parameters of a two layer soil model from usual soil resistivity measurements. Four pin or three pin soil measurements can be accommodated. In addition, it provides error bounds on the soil parameters for a given confidence level. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program SOMIP and provides two test cases for validation purposes. 4 refs.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). School of Electrical Engineering)

1992-05-01T23:59:59.000Z

423

Solar Colletors Combined with Ground-Source Heat Pumps in Dwellings - Analyses of System Performance.  

E-Print Network (OSTI)

??The use of ground-source heat pumps for heating buildings and domestic hot water in dwellings is increasing rapidly in Sweden. The heat pump extracts heat… (more)

Kjellsson, Elisabeth

2009-01-01T23:59:59.000Z

424

NEPA COMPLIANCE SURVEY NEPA Review Routing Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Review Routing Form NEPA Review Routing Form A ::opy of Compliance Surveys for rev.ew. Revised 812/1 0 mjt Originator: Technical Assurance Department - Enylronmental Group D ocument Name: ~a'5 ll:?f\ " B-rr . J(j Bur I e.d ~ (ec-tr ; rJL{ u ~ Documont Numbor: 3 a 5 Date or Routing: ~ I~ I a() II Namo Roviowod Signature Date (~~ Thaf I CUt 1 -f CJ./ W./11 ~ A /rt ...... "" . A-~ r;;;;I £1 "3 7i7 .-J;_~~· ~~ / ' I" - 4 ' . # / . - . 1 ?9 '1' l p /=-- Z-4-11 ,_, y~ -- - - - - - - - - ~ L- ·~~ ,....... ,_ ,.,.. ....... , "'t _,.., , ....... '" / / /1 /7/1....., ,..I\. / / I F r-Q V C. .L> I \ I I ..... Forwarded Forwarded To Date i-t l.tlbrub ~ r:H:.. ~rrr

425

Sources of Water Surface water and groundwater are present throughout  

E-Print Network (OSTI)

Sources of Water Surface water and groundwater are present throughout Kentucky's 39,486 square miles. Surface water occurs as rivers, streams, ponds, lakes, and wetlands. Ground- water occurs underlain by soluble carbonate rocks (for example, limestone). Water Supply � Approximately 49 inches

MacAdam, Keith

426

Reference: RGL 86-06 Subject: WATER QUALITY CERTIFICATION  

E-Print Network (OSTI)

Reference: RGL 86-06 Subject: WATER QUALITY CERTIFICATION Title: WATER QUALITY CONSIDERATIONS IS CONCLUSIVE; HOWEVER, IF STATE CERTIFIES & EPA EXPRESSES WATER QUALITY CONCERNS, DE WILL HAVE TO MAKE FINAL's certification of compliance with applicable effluent limitations and water quality standards to be conclusive

US Army Corps of Engineers

427

Document Number Q0029500 Ground Water Model 3.0 Ground Water...  

Office of Legacy Management (LM)

Creek. Each boundary is described under the following headings. U.S. Department of Energy st Grand Junction MMTS OU 111 Remedial Investigation AddendundFacirsed Feasibility...

428

ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT  

SciTech Connect

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

BECHTEL NEVADA ECOLOGICAL SERVICES

2006-03-01T23:59:59.000Z

429

Waste Isolation Pilot Plant Biennial Environmental Compliance Report  

SciTech Connect

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2002, to March 31, 2004. As required by the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico.

Washington Regulatory and Environmental Services (WRES)

2004-10-25T23:59:59.000Z

430

State of ISRAEL Water Resources Management  

E-Print Network (OSTI)

Supply System #12;State of ISRAEL Complexity of the water distribution system · Different Sources to the main system: ground water, surface water, desalinated water · Utilization of the different sources. Water wells purification and aquifers water quality improvement. Increasing capacity of waste water

Einat, Aharonov

431

Ground Squirrels and Gophers  

NLE Websites -- All DOE Office Websites (Extended Search)

Squirrels and Gophers Squirrels and Gophers Nature Bulletin No. 224-A April 2, 1966 Forest Preserve District of Cook County Seymour Simon, President Roland F. Eisenbeis, Supt. of Conservation GROUND SQUIRRELS AND GOPHERS On sunny summer days, a dusty-colored animal with yellowish and brown stripes, about the size of a small rat, often may be noticed creeping through the grass of prairies, pastures, golf courses or lawns. Watch him. He pauses every few feet to sit up, look and listen for a moment. Nervous and timid, he crouches low at every distant sound or passing shadow. Startle him and he scurries away, and then may suddenly halt and freeze, bolt upright, as stiff and straight as a stake driven in the ground. If approached, he gives a loud shrill trilling whistle and, with a flip of his tail, pops out of sight. Watch that spot closely and, in less than a minute, a snaky head appears. Be quiet. He has many enemies above ground and he also has a lot of curiosity. Presently he sits up upon his haunches again.

432

Posters Ground-Based Radiometric Observations  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Posters Ground-Based Radiometric Observations of Atmospheric Water for Climate Research J. B. Snider, D. A. Hazen, A. J. Francavilla, W. B. Madsen, and M. D. Jacobson National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado Introduction Surface-based microwave and infrared radiometers have been employed by the National Oceanic and Atmospheric Administration's Environmental Technology Laboratory (NOAA/ETL) in climate research since 1987. The ability of these systems to operate continuously and unattended for extended periods of time has provided significant new information on atmospheric water vapor and cloud liquid. These data are being employed to improve our understanding of cloud-radiation feedback mechanisms, an understanding

433

Paper No. RBCSR RESPONSE OF A BURIED CONCRETE PIPELINE TO GROUND  

E-Print Network (OSTI)

Paper No. RBCSR RESPONSE OF A BURIED CONCRETE PIPELINE TO GROUND RUPTURE: A FULL-SCALE EXPERIMENT A typical water distribution system includes a network of steel and concrete pipelines. Concrete segmental pipelines are particularly vulnerable to damage by ground rupture. Ground displacements may produce

Michalowski, Radoslaw L.

434

Ecological Monitoring and Compliance Program 2006 Report  

SciTech Connect

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were avoided during construction activities. Twenty one of the 34 projects had sites within the distribution range of the threatened desert tortoise. NNSA/NSO must comply with the terms and conditions of a permit (called a Biological Opinion) from the U.S. Fish and Wildlife Service (FWS) when conducting work in tortoise habitat. No tortoises were found in or displaced from project areas. No desert tortoises were accidentally injured or killed, nor were any captured or displaced from project sites. One desert tortoise was accidentally killed along a paved road. One site specific revegetation plan was submitted this year as required by the desert tortoise habitat revegetation plan approved in 2004. This year a total of 1.89 ha (4.69 ac) of tortoise habitat was disturbed. Revegetation of habitat at the Bren Tower burn was completed in the spring of 2006. In the summer of 2006, NSTec scientists prepared a Biological Assessment of the security activities that were being conducted at the Device Assembly Facility (DAF). NNSA requested a Biological Opinion from FWS in late 2006. Ecosystem mapping and data management in 2006 focused primarily on two tasks: (a) converting hardcopies of about 17 reports (EMAC annual reports and selected topical reports from 1996 to 2003) into electronic versions (Portable Document Format [PDF] files) to facilitate electronic document exchange, rapid retrieval, duplication, and printing, and (b) conducting an annual vegetation survey to determine wildland fire hazards on the NTS.

David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

2007-03-01T23:59:59.000Z

435

Ecological Monitoring and Compliance Program 2006 Report  

SciTech Connect

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were avoided during construction activities. Twenty one of the 34 projects had sites within the distribution range of the threatened desert tortoise. NNSA/NSO must comply with the terms and conditions of a permit (called a Biological Opinion) from the U.S. Fish and Wildlife Service (FWS) when conducting work in tortoise habitat. No tortoises were found in or displaced from project areas. No desert tortoises were accidentally injured or killed, nor were any captured or displaced from project sites. One desert tortoise was accidentally killed along a paved road. One site specific re-vegetation plan was submitted this year as required by the desert tortoise habitat re-vegetation plan approved in 2004. This year a total of 1.89 ha (4.69 ac) of tortoise habitat was disturbed. Re-vegetation of habitat at the Bren Tower burn was completed in the spring of 2006. In the summer of 2006, NSTec scientists prepared a Biological Assessment of the security activities that were being conducted at the Device Assembly Facility (DAF). NNSA requested a Biological Opinion from FWS in late 2006. Ecosystem mapping and data management in 2006 focused primarily on two tasks: (a) converting hardcopies of about 17 reports (EMAC annual reports and selected topical reports from 1996 to 2003) into electronic versions (Portable Document Format [PDF] files) to facilitate electronic document exchange, rapid retrieval, duplication, and printing, and (b) conducting an annual vegetation survey to determine wildland fire hazards on the NTS. Copies of the PDF documents were sent to DOE's Office of Scientific and Technical Information website in Oak Ridge, Tennessee, and the DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Public Reading Facility.

David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

2007-03-01T23:59:59.000Z

436

Section 55: Results of Compliance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

of drinking water WIPP Waste Isolation Pilot Plant Elements and Chemical Compounds Am americium Pu plutonium Ra radium Rn radon Th thorium U uranium This page intentionally left...

437

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements  

SciTech Connect

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Not Available

2013-03-01T23:59:59.000Z

438

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)  

SciTech Connect

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Sears, T.

2014-01-01T23:59:59.000Z

439

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)  

SciTech Connect

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Not Available

2010-11-01T23:59:59.000Z

440

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Brochure)  

SciTech Connect

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Not Available

2014-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Arkansas Water Resources Center Annual Technical Report  

E-Print Network (OSTI)

) program in cooperation with the US Geological Survey and the National Institutes for Water Resources has wastewater disposal systems, ground water modeling and land use mapping, erosion and pollution, water quality

442

Building Energy Codes COMPLIANCE TOOLKIT BUILDING TECHNOLOGIES PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

COMPLIANCE TOOLKIT COMPLIANCE TOOLKIT BUILDING TECHNOLOGIES PROGRAM Building Energy Codes ACE LEARNING SERIES III Building Energy Codes COMPLIANCE TOOLKIT Prepared by: Building Energy Codes Program (BECP) The U.S. Department of Energy's (DOE) Building Energy Codes Program (BECP) is an information resource on energy codes and standards for buildings. They work with other government agencies, state and local jurisdictions, organizations that develop model codes and standards, and building industry to promote codes that will provide for energy and environmental benefits and help foster adoption of, compliance with, and enforcement of those codes. September 2012 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 PNNL-SA-90466 LEARNING SERIES OVERVIEW Building Energy Codes

443

Evaluating Residential Buildings for Statewide Compliance | Building Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Buildings for Statewide Compliance Residential Buildings for Statewide Compliance The materials for this course may be used for in-person training courses, and are intended to provide the tools and specific training necessary to evaluate residential compliance with the 2009 International Energy Conservation Code (IECC). The course also provides useful training in general residential field inspection for energy code compliance. The recommended background for taking this course is significant experience and/or certification on the IECC in a plan review or inspection capacity. Presenters: Course materials originally published by the DOE Building Energy Codes Program, July 16, 2010. Course Type: Training Materials Video In-person Downloads: Presentation Slides Presentation Slides Presentation Slides and Windows Media Videos

444

Evaluating Commercial Buildings for Statewide Compliance | Building Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Buildings for Statewide Compliance Commercial Buildings for Statewide Compliance The materials for this course may be used for in-person training courses, and are intended to provide the tools and specific training necessary to evaluate statewide commercial compliance with ASHRAE Standard 90.1. The course also provides useful training for the commercial provisions of the International Energy Conservation Code and general commercial field inspection for energy code compliance. The recommended background for taking this class is significant experience with plan review and/or inspection of commercial energy code provisions. Presenters: Course materials originally published by the DOE Building Energy Codes Program, July 16, 2010. Course Type: Training Materials Video In-person Downloads: Presentation Slides

445

Fleet Compliance Results for MY 2011/FY 2012 (Brochure)  

SciTech Connect

This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2011/fiscal year 2012.

Not Available

2013-02-01T23:59:59.000Z

446

Office of NEPA Policy and Compliance, Staff Directory  

Energy.gov (U.S. Department of Energy (DOE))

Office of NEPA Policy and Compliance, Staff Directory including phone number and areas of responsibility for the  Energy and Waste Management Unit, Western Energy and Waste Management Unit, and the...

447

Preliminary Notice of Violation and Compliance Order, EA-1999...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Violation and Compliance Order, EA-1999-04 May 26, 1999 Issued to Fluor Daniel Hanford, Inc., relating to events at the Spent Nuclear Fuels Project, K-Basins and other...

448

Environmental Compliance and Sustainability The College of William and Mary  

E-Print Network (OSTI)

Environmental Compliance and Sustainability The College of William and Mary Thomas. Thanks are also in order for Professor Sarah Stafford, The College of William nautical miles1 from San Francisco? How will Blueseed demonstrate sustainability

Lewis, Robert Michael

449

Knowledge discovery in corporate email : the compliance bot meets Enron  

E-Print Network (OSTI)

I propose the creation of a real-time compliance "bot" - software to momentarily pause each employee's email at the moment of sending and to electronically assess whether that email is likely to create liability or ...

Waterman, K. Krasnow

2006-01-01T23:59:59.000Z

450

Carbon Compliance Acquisition 5 Limited | Open Energy Information  

Open Energy Info (EERE)

Acquisition 5 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 5 Limited Place: Greater London, United Kingdom Zip: EC2M 2TD Sector: Carbon Product: This is...

451

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Jump to main content. National Environmental Policy Act (NEPA) Recent Additions | Contact Us Search: All EPA Compliance and Enforcement q You are here: EPA Home q Compliance and Enforcement q National Environmental Policy Act (NEPA) q Submitting Environmental Impact Statements Submitting Environmental Impact Statements q Amended EIS Filing System Guidelines (January 2011) q Where to Submit (or "File") an EIS q Filing an EIS--Draft, Final and Supplemental q EIS Filing Procedure for Continuity of Operations Plan (COOP) Events q Notice in the Federal Register q Time Periods Amended EIS Filing System Guidelines (January 2011)

452

ENVIRONMENTAL ASSESSMENT Waste Water Treatment Modifications for  

E-Print Network (OSTI)

Actions - Isolate and restore sand filter beds (~10 acres) - Remove UV light sanitation system ­ evaluateENVIRONMENTAL ASSESSMENT FOR Waste Water Treatment Modifications for Improved Effluent Compliance adhering to them. · Develop recharge basins for disposal of treated waste water. Polythiocarbonate

Homes, Christopher C.

453

AT-400A compliance test report  

SciTech Connect

In 1993 Sandia was directed to design containers for the long-term storage and transport of nuclear weapons origin fissile material. This program was undertaken at the direction of the US Department of Energy and in cooperation with Lawrence Livermore National Laboratory and Los Alamos National Laboratory. Lawrence Livermore National Laboratory and Los Alamos National Laboratory were tasked with developing the internal fixturing for the contents. The hardware is being supplied by AlliedSignal Federal Manufacturing and Technologies, and the packaging process has been developed at Mason and Hanger Corporation`s Pantex Plant. The unique challenge was to design a container that could be sealed with the fissile material contents; and, anytime during the next 50 years, the container could be transported with only the need for the pre-shipment leak test. This required a rigorous design capable of meeting the long-term storage and transportation requirements. This report addresses the final testing that was undertaken to demonstrate compliance with US radioactive materials transport regulations.

Glass, R.E.

1998-06-01T23:59:59.000Z

454

DWPF waste form compliance plan (Draft Revision)  

SciTech Connect

The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970`s, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

Plodinec, M.J.; Marra, S.L.

1991-12-31T23:59:59.000Z

455

DWPF waste form compliance plan (Draft Revision)  

SciTech Connect

The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

Plodinec, M.J.; Marra, S.L.

1991-01-01T23:59:59.000Z

456

The LOFT Ground Segment  

E-Print Network (OSTI)

LOFT, the Large Observatory For X-ray Timing, was one of the ESA M3 mission candidates that completed their assessment phase at the end of 2013. LOFT is equipped with two instruments, the Large Area Detector (LAD) and the Wide Field Monitor (WFM). The LAD performs pointed observations of several targets per orbit (~90 minutes), providing roughly ~80 GB of proprietary data per day (the proprietary period will be 12 months). The WFM continuously monitors about 1/3 of the sky at a time and provides data for about ~100 sources a day, resulting in a total of ~20 GB of additional telemetry. The LOFT Burst alert System additionally identifies on-board bright impulsive events (e.g., Gamma-ray Bursts, GRBs) and broadcasts the corresponding position and trigger time to the ground using a dedicated system of ~15 VHF receivers. All WFM data are planned to be made public immediately. In this contribution we summarize the planned organization of the LOFT ground segment (GS), as established in the mission Yellow Book 1 . We...

Bozzo, E; Argan, A; Barret, D; Binko, P; Brandt, S; Cavazzuti, E; Courvoisier, T; Herder, J W den; Feroci, M; Ferrigno, C; Giommi, P; Götz, D; Guy, L; Hernanz, M; Zand, J J M in't; Klochkov, D; Kuulkers, E; Motch, C; Lumb, D; Papitto, A; Pittori, C; Rohlfs, R; Santangelo, A; Schmid, C; Schwope, A D; Smith, P J; Webb, N A; Wilms, J; Zane, S

2014-01-01T23:59:59.000Z

457

WATER RESOURCES NEWS NEBRASKA WATER RESOURCES RESEARCH INSTITUTE  

E-Print Network (OSTI)

BUILDING THE UNIVERSITY OF NEBRASKA LINCOLN, NEBRASKA 68503 Volume 5 Number 6 FROM THE DESK OF THE DIRECTOR of Water Use; (2) Nonpoint Source Pollution; (3) Meeting Water Requirements; (4) Energy-Water Relationships; (5) Maintenance of Environmental Quality; and (6) Conjunctive Management of Ground and Surface Water

Nebraska-Lincoln, University of

458

Water Current University of Nebraska Water Center/Environmental Programs  

E-Print Network (OSTI)

, nonpoint source issues, recycling, composting, remediation, hazardous waste and many other waste- and water Ground Water," for the Nebraska Depart- ment of Agriculture. The results of this study will be made avaWater Current University of Nebraska Water Center/Environmental Programs wASTEmanagement problem

Nebraska-Lincoln, University of

459

Fresh Water Increased temperature means higher proportion of water  

E-Print Network (OSTI)

Fresh Water Increased temperature means higher proportion of water falling on surface higher evaporation higher rainfall greater intensity of floods and droughts. Water use has grown four on How much storage compared to average flow Demand as percentage of supply How much ground water is used

Houston, Paul L.

460

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlground level, and a new well will be drilled environment] using water based mud. The existing rat I mouse hole on the site will be backfilled. A new 6700 ft3 reserve pit [80' long by 30' wide by 4' deep allowing for 2' of freeboard] will be constructed on location. and a 12 mm 2. Legal location liner will be installed. 3. Duration of the project 4. Major equipment to be used

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Surface Water Development in Texas.  

E-Print Network (OSTI)

an annual yield of ground water for all Texas river basins of 4.3 million acre-feet per year. By comparison, the Board shows annual use of ground water for irrigation alone to exceed 10.0 million acre-feet per year. Other uses increase the annual defi... purposes, with small allocations used almost entirely for petroleum production. Water for fu- ture mining needs will largely be met by local surface and ground water resources. A small amount of power is produced by hydro- electric plants in Texas...

McNeely, John G.; Lacewell, Ronald D.

1977-01-01T23:59:59.000Z

462

Ground potential rise monitor  

DOE Patents (OSTI)

A device and method for detecting ground potential rise (GPR) comprising positioning a first electrode and a second electrode at a distance from each other into the earth. The voltage of the first electrode and second electrode is attenuated by an attenuation factor creating an attenuated voltage. The true RMS voltage of the attenuated voltage is determined creating an attenuated true RMS voltage. The attenuated true RMS voltage is then multiplied by the attenuation factor creating a calculated true RMS voltage. If the calculated true RMS voltage is greater than a first predetermined voltage threshold, a first alarm is enabled at a local location. If user input is received at a remote location acknowledging the first alarm, a first alarm acknowledgment signal is transmitted. The first alarm acknowledgment signal is then received at which time the first alarm is disabled.

Allen, Zachery W. (Mandan, ND); Zevenbergen, Gary A. (Arvada, CO)

2012-04-03T23:59:59.000Z

463

Effect of Drip Irrigation with Saline Water on Water Use Efficiency and Quality of Watermelons  

Science Journals Connector (OSTI)

High ground water salinity, high water table and secondary soil salinization are dominant ... the purposes of eliminating secondary salinity and enhancing water use efficiency, drip irrigation of watermelons with...

Lei Tingwu; Xiao Juan; Li Guangyong; Mao Jianhua…

2003-12-01T23:59:59.000Z

464

Unexploded ordnance issues at Aberdeen Proving Ground: Background information  

SciTech Connect

This document summarizes currently available information about the presence and significance of unexploded ordnance (UXO) in the two main areas of Aberdeen Proving Ground: Aberdeen Area and Edgewood Area. Known UXO in the land ranges of the Aberdeen Area consists entirely of conventional munitions. The Edgewood Area contains, in addition to conventional munitions, a significant quantity of chemical-munition UXO, which is reflected in the presence of chemical agent decomposition products in Edgewood Area ground-water samples. It may be concluded from current information that the UXO at Aberdeen Proving Ground has not adversely affected the environment through release of toxic substances to the public domain, especially not by water pathways, and is not likely to do so in the near future. Nevertheless, modest but periodic monitoring of groundwater and nearby surface waters would be a prudent policy.

Rosenblatt, D.H.

1996-11-01T23:59:59.000Z

465

Compliance status report for the Waste Isolation Pilot Plant  

SciTech Connect

The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

Not Available

1994-03-31T23:59:59.000Z

466

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

467

3Compliance Status 2008 Site environmental report  

E-Print Network (OSTI)

of Environmental Conservation (NYSDEC). Emissions of nitrogen oxides, carbon monoxide, and sulfur dioxide from the Central Steam Facility were all within permit limits. There were no opacity excursions noted and were due to slightly elevated levels of nitrogen. The third was the recording of high pH in the water

468

Interaction of Compliance and Voluntary Renewable Energy Markets  

NLE Websites -- All DOE Office Websites (Extended Search)

Interaction of Compliance Interaction of Compliance and Voluntary Renewable Energy Markets Lori Bird and Elizabeth Lokey Technical Report NREL/ TP-670-42096 October 2007 NREL is operated by Midwest Research Institute ● Battelle Contract No. DE-AC36-99-GO10337 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle Contract No. DE-AC36-99-GO10337 Technical Report NREL/ TP-670-42096 October 2007 Interaction of Compliance and Voluntary Renewable Energy Markets Lori Bird and Elizabeth Lokey Prepared under Task No. IGST.7330 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

469

ACE Learning Series - Adoption, Compliance, and Enforcement | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Center Resource Center Site Map Printable Version Development Adoption Compliance Regulations Resource Center FAQs Publications Resource Guides eLearning Model Policies Glossary Related Links ACE Learning Series Utility Savings Estimators ACE Learning Series - Adoption, Compliance, and Enforcement ACE Learning Series Buildings account for almost 40% of the energy used in the United States and, as a direct result of that use, our environment and economy are impacted. Building energy codes and standards provide an effective response. The Building Energy Codes Program (BECP) designed the ACE Learning Series for those in the building industry having the greatest potential to influence the adoption of and compliance with building energy codes and standards. The Learning Series consists of:

470

General Atomics Compliance Order, October 6, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Atomics General Atomics Agreement Name General Atomics Compliance Order, October 6, 1995 HWCA 95/96-017 State California Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Address LDR requirements pertaining to storage and treatment of covered waste at General Atomics Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 10/6/1995 SCOPE * Address LDR requirements pertaining to storage and treatment of covered waste at General Atomics. * Require adherence to the Site Treatment Plan which provides overall schedules for achieving compliance with LDR storage and treatment requirements based on milestones. ESTABLISHING MILESTONES * Respondent shall carry out all activities in accordance with the schedules and

471

Oak Ridge Reservation Compliance Order, September 26, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Reservation Compliance Order, September Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge Reservation," hereafter known as the Plan. * Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan. ESTABLISHING MILESTONES * Schedules are contained in the Plan.

472

ACE Learning Series - Compliance Toolkit | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Toolkit Compliance Toolkit The compliance toolkit describes the steps that should be taken by the build community to make sure that their buildings meet the requirements of the energy codes in effect where the buildings are being built and that the building designs are well documented so that the enforcement community can quickly and easily determine if the building meets the requirement of the energy code. This toolkit describes the steps that should be taken by the build community to make sure that their buildings meet the requirements of the energy codes in effect where the buildings are being built and that the building designs are well documented so that the enforcement community can quickly and easily determine if the building meets the requirement of the

473

Lawrence Berkeley National Laboratory Compliance Order, October 6, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Berkeley National Laboratory Berkeley National Laboratory Agreement Name Lawrence Berkeley National Laboratory Compliance Order, October 6, 1995 HWCA # 95/96-016 State California Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Address LDR requirements pertaining to storage and treatment of covered waste at LBNL Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 10/6/1995 SCOPE * Address LDR requirements pertaining to storage and treatment of covered waste at LBNL. * Require adherence to the Site Treatment Plan which provides overall schedules for achieving compliance with LDR storage and treatment requirements based on milestones. ESTABLISHING MILESTONES * Respondent shall carry out all activities in accordance with the schedules and

474

Contacts for NEPA Policy and Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Us » Contact Us » Contacts for NEPA Policy and Compliance Us » Contact Us » Contacts for NEPA Policy and Compliance Contacts for NEPA Policy and Compliance Carol Borgstrom, Director 202-586-4600 carol.borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 lettie.wormley@hq.doe.gov Eric Cohen, Supervisory Environmental Protection Specialist 202-586-7684 eric.cohen@hq.doe.gov Brian Costner, Supervisory Environmental Protection Specialist 202-586-9924 brian.costner@hq.doe.gov James (Jim) Daniel, Supervisory Environmental Protection Specialist 202-586-9760 daniel.james@hq.doe.gov Ralph Barr, Environmental Protection Specialist 202-586-3448 ralph.barr@hq.doe.gov Vivian Bowie, Environmental Protection Specialist 202-586-1771 vivian.bowie@hq.doe.gov Connie Chen, Environmental Protection Specialist 202-586-0733 connie.chen@hq.doe.gov

475

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY Carol Borgstrom, Director 202-586-4600 Carol.Borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 Lettie.Wormley@hq.doe.gov Eastern Energy and Waste Management Unit Contact Program/Responsibility Special Projects or Topics Brian Costner Brian.Costner@hq.doe.gov 202-586-9924 Unit Leader Yardena Mansoor Yardena.Mansoor@hq.doe.gov 202-586-9326 Office of Environmental Management * Oak Ridge Office * Savannah River Operations Office Office of Fossil Energy * Strategic Reserves * Liquefied Natural Gas (LNG) Office of Electricity Delivery and Energy Reliability * Champlain Hudson Power Express Western Area Power Administration Bonneville Power Administration

476

National Environmental Policy Act (NEPA) Compliance Guide, Sandia National Laboratories  

SciTech Connect

This report contains a comprehensive National Environmental Policy Act (NEPA) Compliance Guide for the Sandia National Laboratories. It is based on the Council on Environmental Quality (CEQ) NEPA regulations in 40 CFR Parts 1500 through 1508; the US Department of Energy (DOE) N-EPA implementing procedures in 10 CFR Part 102 1; DOE Order 5440.1E; the DOE ``Secretarial Policy Statement on the National Environmental Policy Act`` of June 1994- Sandia NEPA compliance procedures-, and other CEQ and DOE guidance. The Guide includes step-by-step procedures for preparation of Environmental Checklists/Action Descriptions Memoranda (ECL/ADMs), Environmental Assessments (EAs), and Environmental Impact Statements (EISs). It also includes sections on ``Dealing With NEPA Documentation Problems`` and ``Special N-EPA Compliance Issues.``

Hansen, R.P. [Hansen Environmental Consultants, Englewood, CO (United States)

1995-08-01T23:59:59.000Z

477

Compliance agreements at the INEL: A success story  

SciTech Connect

The Radioactive Waste Management Complex (RWMC), located at the Idaho National Engineering Laboratory (INEL), is the storage facility for approximately 135,000 containers of radioactive mixed waste that must be stored in accordance with Resource Conservation and Recovery Act (RCRA) requirements. Collectively, the compliance and safety basis documents governing the operation of the storage facility contain approximately 2,500 specific, identifiable requirements. Critical to the compliance with these 2,500 requirements was the development of a process which converted these requirements to a form and format that allowed implementation at the operator level. Additionally, to ensure continued compliance, a method of identifying and controlling implementing documents is imperative. This paper discusses the methods employed to identify, implement, and control these requirements.

McBath, W.H.

1995-11-01T23:59:59.000Z

478

Learning & Development Policy/Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learning & Development Policy/Compliance Learning & Development Policy/Compliance Learning & Development Policy/Compliance Searching for information on Department and Federal training policy and guidelines? The following websites can be of help: DOE Learning & Development Training Policies and Guidelines On the DOE Directives page you will find the following information: DOE O360.1b Federal Employee Training Order DOE M360.1-1B Federal Employee Training Manual DOE O361.1B Acquisition Career Management Program Office of Personnel Management Federal Government Training Policies and Guidelines Training and Development Policy Training Policy Handbook Training, however, is a program, not just a set of authorities, and works within a context that includes Federal procurement authorities, personnel

479

Conditioning of aggressive water in Suriname:.  

E-Print Network (OSTI)

??In Suriname groundwater is mostly used for drinking water production. Depending on the ground layers from which groundwater is extracted, groundwater is characterized as aggressive… (more)

Salmin, A.

2008-01-01T23:59:59.000Z

480

Drinking Water Problems: MTBE  

E-Print Network (OSTI)

Methyl tertiary-butyl ether, a gasoline additive commonly known as MTBE, can contaminate ground water and cause health problems for those exposed to it for a long time. However, filtering devices can remove this and other additives from well water...

Dozier, Monty; Lesikar, Bruce J.

2008-08-28T23:59:59.000Z

Note: This page contains sample records for the topic "ground water compliance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Surveillance Guide - ERS 14.3 Underground and Above Ground Diesel Fuel Storage Tanks  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UNDERGROUND AND ABOVE GROUND DIESEL FUEL STORAGE TANKS UNDERGROUND AND ABOVE GROUND DIESEL FUEL STORAGE TANKS 1.0 Objective The objective of this surveillance is to verify underground and above ground diesel storage tanks are maintained, monitored, configured and marked as required. These surveillance activities provide a basis for evaluating the effectiveness of the contractor's program for implementation of appropriate controls and compliance with DOE requirements. 2.0 References 1. DOE O 440.1A, Worker Protection Management For DOE Federal And Contractor Employees [http://www.explorer.doe.gov:1776/cgi-bin/w3vdkhgw?qryBGD07_rSj;doe- 1261] 1. 29CFR1910.1200, Subpart Z, Hazard Communication [Access http://www.osha-slc.gov/OshStd_data/1910_1200.html ] 2. 29CFR1910.106, Subpart H, Flammable And Combustible Liquids [Access at

482

The waste isolation pilot plant regulatory compliance program  

SciTech Connect

The passage of the WIPP Land Withdrawal Act of 1992 (LWA) marked a turning point for the Waste Isolation Pilot Plant (WIPP) program. It established a Congressional mandate to open the WIPP in as short a time as possible, thereby initiating the process of addressing this nation`s transuranic (TRU) waste problem. The DOE responded to the LWA by shifting the priority at the WIPP from scientific investigations to regulatory compliance and the completion of prerequisites for the initiation of operations. Regulatory compliance activities have taken four main focuses: (1) preparing regulatory submittals; (2) aggressive schedules; (3) regulator interface; and (4) public interactions

Mewhinney, J.A. [U.S. Dept. of Energy, Carlsbad, NM (United States); Kehrman, R.F. [Westinghouse Electric Corp., Carlsbad, NM (United States)

1996-06-01T23:59:59.000Z

483

Compliance Certification Enforcement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 26, 2010 April 26, 2010 EZ-FLO International: Order (2010-CW-1401) DOE ordered EZ-FLO International, Inc. to pay a $20,000 civil penalty after finding EZ-FLO had failed to certify that certain models of showerhead comply with the applicable water conservation standard. April 26, 2010 Zoe Industries: Order (2010-CW-1405) DOE ordered Zoe Industries, Inc. to pay a $5,000 civil penalty after finding Zoe had failed to certify that certain models of showerheads comply with the applicable water conservation standards. April 21, 2010 Watermark Designs: Order (2010-CW-1404) DOE ordered Watermark Designs Holdings, Ltd. d/b/a Watermark Designs, Ltd. to pay a $135,104 civil penalty after finding Watermark Designs had failed to certify that various models of showerheads comply with the applicable

484

On LHCb muon MWPC grounding  

E-Print Network (OSTI)

My goal is to study how a big MWPC system, in particular the LHCb muon system, can be protected against unstable operation and multiple spurious hits, produced by incorrect or imperfect grounding in the severe EM environment of the LHCb experiment. A mechanism of penetration of parasitic current from the ground loop to the input of the front-end amplifier is discussed. A new model of the detector cell as the electrical bridge is considered. As shown, unbalance of the bridge makes detector to be sensitive to the noise in ground loop. Resonances in ground loop are specified. Tests of multiple-point and single-point grounding conceptions made on mock-up are presented.

Kashchuk, A

2006-01-01T23:59:59.000Z

485

Ground-source Heat Pumps Applied to Commercial Buildings  

SciTech Connect

Ground-source heat pumps can provide an energy-efficient, cost-effective way to heat and cool commercial facilities. While ground-source heat pumps are well established in the residential sector, their application in larger, commercial-style, facilities is lagging, in part because of a lack of experience with the technology by those in decision-making positions. Through the use of a ground-coupling system, a conventional water-source heat pump design is transformed to a unique means of utilizing thermodynamic properties of earth and groundwater for efficient operation throughout the year in most climates. In essence, the ground (or groundwater) serves as a heat source during winter operation and a heat sink for summer cooling. Many varieties in design are available, so the technology can be adapted to almost any site. Ground-source heat pump systems can be used widely in commercial-building applications and, with proper installation, offer great potential for the commercial sector, where increased efficiency and reduced heating and cooling costs are important. Ground-source heat pump systems require less refrigerant than conventional air-source heat pumps or air-conditioning systems, with the exception of direct-expansion-type ground-source heat pump systems. This chapter provides information and procedures that an energy manager can use to evaluate most ground-source heat pump applications. Ground-source heat pump operation, system types, design variations, energy savings, and other benefits are explained. Guidelines are provided for appropriate application and installation. Two case studies are presented to give the reader a sense of the actual costs and energy savings. A list of manufacturers and references for further reading are included for prospective users who have specific or highly technical questions not fully addressed in this chapter. Sample case spreadsheets are provided in Appendix A. Additional appendixes provide other information on the ground-source heat pump technology.

Parker, Steven A.; Hadley, Donald L.

2009-07-14T23:59:59.000Z

486

Ground-Source Heat Pumps Applied to Commercial Buildings  

SciTech Connect

Ground-source heat pumps can provide an energy-efficient, cost-effective way to heat and cool commercial facilities. While ground-source heat pumps are well established in the residential sector, their application in larger, commercial-style, facilities is lagging, in part because of a lack of experience with the technology by those in decision-making positions. Through the use of a ground-coupling system, a conventional water-source heat pump design is transformed to a unique means of utilizing thermodynamic properties of earth and groundwater for efficient operation throughout the year in most climates. In essence, the ground (or groundwater) serves as a heat source during winter operation and a heat sink for summer cooling. Many varieties in design are available, so the technology can be adapted to almost any site. Ground-source heat pump systems can be used widely in commercial-building applications and, with proper installation, offer great potential for the commercial sector, where increased efficiency and reduced heating and cooling costs are important. Ground-source heat pump systems require less refrigerant than conventional air-source heat pumps or air-conditioning systems, with the exception of direct-expansion-type ground-source heat pump systems. This chapter provides information and procedures that an energy manager can use to evaluate most ground-source heat pump applications. Ground-source heat pump operation, system types, design variations, energy savings, and other benefits are explained. Guidelines are provided for appropriate application and installation. Two case studies are presented to give the reader a sense of the actual costs and energy savings. A list of manufacturers and references for further reading are included for prospective users who have specific or highly technical questions not fully addressed in this chapter. Sample case spreadsheets are provided in Appendix A. Additional appendixes provide other information on the ground-source heat pump technology.

Parker, Steven A.; Hadley, Donald L.

2006-12-31T23:59:59.000Z

487

Regional analysis of ground and above-ground climate  

SciTech Connect

The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

Not Available

1981-12-01T23:59:59.000Z

488

Laboratory for Energy-Related Health Research Compliance Order, October 6, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Energy-Related Health Research (LEHR) Compliance Order, October 6, 1.. Page 1 of 11 for Energy-Related Health Research (LEHR) Compliance Order, October 6, 1.. Page 1 of 11 EM Home | Regulatory Compliance | Environmental Compliance Agreements Laboratory for Energy-Related Health Research (LEHR) Compliance Order, October 6, 1995 STATE OF CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY DEPARTMENT OF TOXIC SUBSTANCES CONTROL _________________________________ In the Matter of: LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH (LEHR). HWCA U.S. DEPARTMENT OF ENERGY, Respondent. ) ) ) COMPLIANCE ORDER ) 95/96 -020 ) ) ) ) _________________________________) FEDERAL FACILITY COMPLIANCE ACT ORDER FOR THE LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH (LEHR) This Order is issued by the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC) to require compliance by the United States Department of Energy (DOE)

489

Estimation of fracture compliance from tubewaves generated at a fracture intersecting a borehole  

E-Print Network (OSTI)

Understanding fracture compliance is important for characterizing fracture networks and for inferring fluid flow in the subsurface. In an attempt to estimate fracture compliance in the field, we developed a new model to ...

Bakku, Sudhish Kumar

2011-01-01T23:59:59.000Z

490

E-Print Network 3.0 - administration compliance program Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

finance, compliance issues related to federally funded programs, operational... efficiency, strategic planning, financial modeling, and other administrative,...

491