Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Colorado Wind Resource at 50 Meters Above Ground Level  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Resource at 50 Meters Above Ground Level Wind Resource at 50 Meters Above Ground Level Metadata also available as Metadata: Identification_Information Data_Quality_Information Spatial_Data_Organization_Information Spatial_Reference_Information Entity_and_Attribute_Information Distribution_Information Metadata_Reference_Information Identification_Information: Citation: Citation_Information: Originator: AWS TrueWind/NREL Publication_Date: December 2003 Title: Colorado Wind Resource at 50 Meters Above Ground Level Geospatial_Data_Presentation_Form: vector digital data Online_Linkage: Description: Abstract: Annual average wind resource potential for the state of Colorado,

2

Reference Directions for a Sound Level Meter , M.R. Vaabenb  

E-Print Network (OSTI)

0 and 90 Reference Directions for a Sound Level Meter E. Aflaloa , M.R. Vaabenb , P. Pourtaua , D the requirements of the IEC 61672 standard on sound level meters taking into account noise incidence from level meter must be pointed at the source according to standard IEC 60651. The purpose of the paper

Paris-Sud XI, Université de

3

Ash level meter for a fixed-bed coal gasifier  

DOE Patents (OSTI)

An ash level meter for a fixed-bed coal gasifier is provided which utilizes the known ash level temperature profile to monitor the ash bed level. A bed stirrer which travels up and down through the extent of the bed ash level is modified by installing thermocouples to measure the bed temperature as the stirrer travels through the stirring cycle. The temperature measurement signals are transmitted to an electronic signal process system by an FM/FM telemetry system. The processing system uses the temperature signals together with an analog stirrer position signal, taken from a position transducer disposed to measure the stirrer position to compute the vertical location of the ash zone upper boundary. The circuit determines the fraction of each total stirrer cycle time the stirrer-derived bed temperature is below a selected set point, multiplies this fraction by the average stirrer signal level, multiplies this result by an appropriate constant and adds another constant such that a 1 to 5 volt signal from the processor corresponds to a 0 to 30 inch span of the ash upper boundary level. Three individual counters in the processor store clock counts that are representative of: (1) the time the stirrer temperature is below the set point (500.degree. F.), (2) the time duration of the corresponding stirrer travel cycle, and (3) the corresponding average stirrer vertical position. The inputs to all three counters are disconnected during any period that the stirrer is stopped, eliminating corruption of the measurement by stirrer stoppage.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

4

Colorado Wind Resource at 50 Meters Above Ground Level  

NLE Websites -- All DOE Office Websites (Extended Search)

Metadata also available as Metadata: IdentificationInformation DataQualityInformation SpatialDataOrganizationInformation SpatialReferenceInformation EntityandAttributeI...

5

Feasibility Study of Developing a Virtual Chilled Water Flow Meter at Air Handling Unit Level  

E-Print Network (OSTI)

In this paper, a virtual Air handling unit (AHU) level water flow meter is explored by using a control valve as a measurement device. The flow through the valve is indirectly calculated using differential pressure over both the valve and its...

Song, L.; Swamy, A.; Shim, G.

2011-01-01T23:59:59.000Z

6

UK Electricity Consumption and Number of Meters at MLSOA level (2008) |  

Open Energy Info (EERE)

8) 8) Dataset Summary Description The UK Department of Energy and Climate Change (DECC) releases annual statistics on domestic and non-domestic electricity and gas consumption (and number of meters) at the Middle Layer Super Output Authority (MLSOA) and Intermediate Geography Zone (IGZ) level (there are over 950 of these subregions throughout England, Scotland and Wales). Both MLSOAs (England and Wales) and IGZs (Scotland) include a minimum of approximately 2,000 households. The electricity consumption data data is split by ordinary electricity and economy7 electricity usage. All data in this set are classified as UK National Statistics. Related socio-economic data for MLSOA and IGZ levels can be accessed: http://decc.gov.uk/assets/decc/Statistics/regional/mlsoa2008/181-mlsoa-i...

7

UK Electricity Consumption and Number of Meters at MLSOA level (2005 -  

Open Energy Info (EERE)

5 - 5 - 2007) Dataset Summary Description The UK Department of Energy and Climate Change (DECC) releases annual statistics on domestic and industrial/commercial electricity and gas consumption (and number of meters) at the Middle Layer Super Output Authority (MLSOA) and Intermediate Geography Zone (IGZ) level (there are over 950 of these subregions throughout England, Scotland and Wales). Both MLSOAs (England and Wales) and IGZs (Scotland) include a minimum of approximately 2,000 households. The domestic electricity consumption data data is split by ordinary electricity and economy7 electricity usage. These data are classified as UK National Statistics. Note about spreadsheets: separate tabs exist for each local authority (LA), but the tabs are hidden. To view data, simply 'unhide' the appropriate tab(s). You do not need to "enable macros" to view the data. Related socio-economic data for MLSOA and IGZ levels can be accessed: http://decc.gov.uk/assets/decc/Statistics/regional/mlsoa2008/181-mlsoa-i...

8

Metering Systems  

Energy.gov (U.S. Department of Energy (DOE))

A variety of metering systems are currently on the market for Federal facility implementation. The information below outlines common metering system capabilities and common metering system components.

9

Saturation meter  

DOE Patents (OSTI)

A saturation meter for use in a pressurized water reactor plant comprising a differential pressure transducer having a first and second pressure sensing means and an alarm. The alarm is connected to the transducer and is preset to activate at a level of saturation prior to the formation of a steam void in the reactor vessel.

Gregurech, S.

1984-08-01T23:59:59.000Z

10

High-energy cosmic-ray muons at ground level and below ground level  

Science Journals Connector (OSTI)

Sea-level muon spectrum predictions for the vertical and greatly ... and also by Cantrell by means of both energy-independent and energy-dependent hadron-nucleus inelastic crosssections. Most recently observed gr...

C. R. Paul; N. Chaudhuri

1976-01-11T23:59:59.000Z

11

High-energy cosmic-ray muons at ground level and below ground level  

Science Journals Connector (OSTI)

Cosmic-ray muon interactions have been studied in an analysis of very recent measurements of cosmic-ray muons at sea-level and large depths underground ... By starting with the very carefully measured vertical muon

C. R. Paul; N. Chaudhuri

1977-01-11T23:59:59.000Z

12

WOOD STREET METERED LOT  

E-Print Network (OSTI)

LOT E1 LOT O WOOD STREET METERED LOT LOT W5 LOT C4 LOT B4 LOT L LOT M MARSHFIELDAVENUE PAULINASTREET Clinical Sciences Building UI Hospital Wood Street Station Clinical Sciences North Grand Grounds Garden

Dai, Yang

13

P ORNiiTM-7004 Results of Ground Level Radiation  

Office of Legacy Management (LM)

ORNiiTM-7004 ORNiiTM-7004 Results of Ground Level Radiation Measurements in Support of the 1978 Aerial Survey of the Lake Ontario Ordnance W o rks, Lewiston, New York _ ict~~.. By A, grven _, ,_~ ~.~ _,. :::;(' ~. . ' -- .- ,. R. W . Doane F. F. Haywood W . H. Shinpaugh ORNL/TM-7004 Dist. Category UC-41 Contract No. W-7405eng-26 RESULTS OF GROUND LEVEL RADIATION MEASUREMENTS IN SUPPORT OF THE 1978 AERIAL SURVEY OF THE LAKE ONTARIO ORDNANCE WORKS, LEWISTON, NEW YORK B. A. Berven F. F. Haywood R. W. Doane W. H. Shinpaugh Work performed by Health and Safety Research Division Date Published: September 1979 Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites -

14

Metering Process  

Energy.gov (U.S. Department of Energy (DOE))

Developing and implementing a metering plan is highly dependent on the individual facility's needs, mission, metering equipment, and available infrastructure. One size does not fit all.

15

Wideband noise observed at ground level in the auroral region  

SciTech Connect

A sideband noise event was detected at ground level from the Andoya Rocket Range in Norway in January 1989. The signals were observed on four commercial communication receivers (tuned to 159, 515, 905, and 1200 kHz), an ionosonde (200-kHz to 3.5-MHz interference-free observations) and a riometer (32.5 MHz). The event, which occurred during a period of magnetic disturbance near magnetic midnight, was the only one observed during nearly 3 weeks of operations. This low frequency-of-occurrence is attributed partly to high local noise levels. The ease with which this event was identified on the ionograms produced by the local ionosonde suggests that routine ionosonde recordings should be inspected in search for such events. Such an effort would enhance existing research directed toward developing techniques for identifying quiet communication channels and help to identify the origin and frequency-of-occurrence of high-latitude wideband noise events. 20 refs.

Benson, R.F.; Desch, M.D. (NASA, Goddard Space Flight Center, Greenbelt, MD (United States))

1991-08-01T23:59:59.000Z

16

Ground-level nitrogen dioxide concentrations inferred from the satellite-borne Ozone Monitoring Instrument  

E-Print Network (OSTI)

Ground-level nitrogen dioxide concentrations inferred from the satellite-borne Ozone Monitoring; published 28 August 2008. [1] We present an approach to infer ground-level nitrogen dioxide (NO2), Ground-level nitrogen dioxide concentrations inferred from the satellite-borne Ozone Monitoring

Martin, Randall

17

Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

In October 2009, the Regulatory Commission of Alaska (RCA) approved net metering regulations. These rules were finalized and approved by the lieutenant governor in January 2010 and became...

18

EA-1203: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Trench 33 Widening in 218-W-5 Low-level Burial Ground, 3: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington EA-1203: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for the proposal to widen and operate the unused Trench 33 in the 218-W-5 Low-Level Burial Ground at the U.S. Department of Energy's Richland Operations Office. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 28, 1997 EA-1203: Finding of No Significant Impact Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington

19

Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

North Dakota's net-metering policy, adopted in 1991 by the state Public Service Commission (PSC), applies to renewable-energy systems and combined heat and power (CHP) systems up to 100 kilowatts ...

20

Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

[http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf LB 436], signed in May 2009, established statewide net metering rules for all electric utilities in Nebraska. The rules apply to...

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

Nevada's original net-metering law for renewable-energy systems was enacted in 1997 and amended in 2001, 2003, 2005 and 2007. Systems up to one megawatt (MW) in capacity that generate electricity...

22

EA-1276: Widening Trench 36 of the 218-E-12B Low-level Burial Ground,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: Widening Trench 36 of the 218-E-12B Low-level Burial 76: Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site, Richland, Washington EA-1276: Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for the proposal to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste at the U.S. Department of Energy Hanford Site. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 11, 1999 EA-1276: Finding of No Significant Impact Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site, Richland, Washington February 11, 1999 EA-1276: Final Environmental Assessment Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site,

23

Meters | OpenEI  

Open Energy Info (EERE)

Meters Meters Dataset Summary Description The UK Department of Energy and Climate Change (DECC) releases annual statistics on domestic and non-domestic electricity and gas consumption (and number of meters) at the Middle Layer Super Output Authority (MLSOA) and Intermediate Geography Zone (IGZ) level (there are over 950 of these subregions throughout England, Scotland and Wales). Both MLSOAs (England and Wales) and IGZs (Scotland) include a minimum of approximately 2,000 households. The electricity consumption data data is split by ordinary electricity and economy7 electricity usage. Source UK Department of Energy and Climate Change (DECC) Date Released March 25th, 2010 (4 years ago) Date Updated Unknown Keywords Electricity Consumption gas Meters regional

24

Remote metering  

E-Print Network (OSTI)

in order to disoharge it after each oharge. L oontaot caking relay R was next placed in the oircuit ss shown on page 9, pig. 3, to discharge condenser 5 after each impulse. Indications on voltmeter I were now found. to be proportional to the speed... arrangements, the circuit as shown on page 11 was evolve4. ihe use of mepeating coils and a grounded circuit released the telephone circuit for telephone servioe, while placing the relay R as shown made the cal- ibrated circuit a looal oircuit, eliminate4...

Ingram, Henry Lee

2012-06-07T23:59:59.000Z

25

Hydrogeology of the 200 Areas low-level burial grounds: An interim report: Volume 1, Text  

SciTech Connect

This report presents information derived from the installation of 35 ground-water monitoring wells around six low-level radioactive/hazardous waste burial grounds located in the 200 Areas of the Hanford Site in southeastern Washington State. This information was collected between May 20, 1987 and August 1, 1988. The contents of this report have been divided into two volumes. This volume contains the main text. Volume 2 contains the appendixes, including data and supporting information that verify content and results found in the main text. This report documents information collected by the Pacific Northwest Laboratory at the request of Westinghouse Hanford Company. Presented in this report are the preliminary interpretations of the hydrogeologic environment of six low-level burial grounds, which comprise four waste management areas (WMAs) located in the 200 Areas of the Hanford Site. This information and its accompanying interpretations were derived from sampling and testing activities associated with the construction of 35 ground-water monitoring wells as well as a multitude of previously existing boreholes. The new monitoring wells were installed as part of a ground-water monitoring program initiated in 1986. This ground-water monitoring program is based on requirements for interim status facilities in compliance with the Resource Conservation and Recovery Act (1976).

Last, G.V.; Bjornstad, B.N.; Bergeron, M.P.; Wallace, D.W.; Newcomer, D.R.; Schramke, J.A.; Chamness, M.A.; Cline, C.S.; Airhart, S.P.; Wilbur, J.S.

1989-01-01T23:59:59.000Z

26

WHAT CAN WE LEARN FROM HIGH FREQUENCY APPLIANCE LEVEL ENERGY METERING?RESULTS FROM A FIELD EXPERIMENT  

E-Print Network (OSTI)

the household electricity consumption in the EU, potentialon household electricity consumption: a tool for savinghourly appliance-level electricity consumption data for 124

Chen, Victor; Delmas, Magali A; Kaiser, William; Locke, Stephen

2014-01-01T23:59:59.000Z

27

A ground level gamma-ray burst observed in association with rocket-triggered lightning  

E-Print Network (OSTI)

A ground level gamma-ray burst observed in association with rocket-triggered lightning J. R. Dwyer 2004; published 13 March 2004. [1] We report the observation of an intense gamma-ray burst observed lightning channel with gamma-ray energies extending up to more than 10 MeV. The burst consisted of 227

Florida, University of

28

Impact of the 2011 southern US drought on ground-level fine aerosol concentration in summertime  

Science Journals Connector (OSTI)

This study investigates the impacts of the 2011 severe drought in the southern United States (U.S.) on ground-level fine aerosol (PM2.5) concentrations in the summer. The changes in surface concentrations and planetary boundary layer (PBL) budget ...

Yuxuan Wang; Yuanyu Xie; Libao Cai; Wenhao Dong; Qianqian Zhang; Lin Zhang

29

Nitrogen management is essential to prevent tropical oil palm plantations from causing ground-level  

E-Print Network (OSTI)

Nitrogen management is essential to prevent tropical oil palm plantations from causing ground-level ozone pollution C. N. Hewitta,1 , A. R. MacKenziea , P. Di Carlob , C. F. Di Marcoc , J. R. Dorseyd , MCentre for Ecology and Hydrology, Penicuik, Edinburgh EH26 0QB, United Kingdom; dSchool of Earth, Atmospheric

30

Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Metering Program Areas » Operations & Maintenance » Metering Metering October 7, 2013 - 9:21am Addthis Historically, the Federal sector has lagged in metering applications. It is not uncommon to find one meter serving hundreds of Federal facilities. These master meters make it very difficult to manage energy use and are a primary driver for Federal metering requirements. To help Federal agencies meet these requirements, this section outlines strategies and resources surrounding metering best practices, including: Metering Systems: Overview of metering system capabilities and functionality as well as common components across various metering systems Metering Approaches: Description of the four primary approaches to metering, including required equipment common for each approach

31

Hydrogeology of the 200 Areas low-level burial grounds: An interim report: Volume 2, Appendixes  

SciTech Connect

This report presents information derived form the installation of 35 ground-water monitoring wells around six low-level radioactive/hazardous waste burial grounds located in the 200 Areas of the Hanford Site in southeastern Washington State. This information was collected between May 20, 1987 and August 1, 1988. The contents of this report have been divided into two volumes. Volume 1 contains the main text. This Volume contains the appendixes, including data and supporting information that verify content and results found in the main text.

Last, G.V.; Bjornstad, B.N.; Bergeron, M.P.; Wallace, D.W.; Newcomer, D.R.; Schramke, J.A.; Chamness, M.A.; Cline, C.S.; Airhart, S.P.; Wilbur, J.S.

1989-01-01T23:59:59.000Z

32

Development of a High Resolution, Real Time, Distribution-Level Metering System and Associated Visualization, Modeling, and Data Analysis Functions  

SciTech Connect

NREL is developing measurement devices and a supporting data collection network specifically targeted at electrical distribution systems to support research in this area. This paper describes the measurement network which is designed to apply real-time and high speed (sub-second) measurement principles to distribution systems that are already common for the transmission level in the form of phasor measurement units and related technologies.

Bank, J.; Hambrick, J.

2013-05-01T23:59:59.000Z

33

Metering | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

the federal sector has lagged in metering applications. It is not uncommon to find one meter serving hundreds of federal facilities. These master meters make it very difficult to...

34

Western Meter Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

WESTERN AREA POWER ADMINISTRATION Meter Policy November 22, 2013 Western Area Power Administration Meter Policy Version: Final 11222013 2 | P a g e Table of Contents 1. Purpose...

35

Hanford facility dangerous waste permit application, low-level burial grounds  

SciTech Connect

The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

Engelmann, R.H.

1997-08-12T23:59:59.000Z

36

Performance Assessment Monitoring Plan for the Hanford Site Low-Level Burial Grounds  

SciTech Connect

The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal facility for low-level and mixed low-level wastes has been restricted to lined trenches and the Navy reactor-compartment trench only. Hence, as of July 2004, only the two lined trenches in burial ground 218-W-5 (trenches 31 and 34, see Appendix A) and the Navy reactor-compartment trench in burial ground 218 E 12B (trench 94) are allowed to receive waste. When the two lined trenches are filled, the LLBG will cease to operate except for reactor compartment disposal at trench 94. Remaining operational lifetime of the LLBG is dependent on waste volume disposal rates. Existing programs for air sampling and analyses and subsidence monitoring are currently adequate for performance assessment at the LLBG. The waste disposal authorization for the Hanford Site is based (in part) on the post-closure performance assessments for the LLBG. In order to maintain a useful link between operational monitoring (e.g., Resource Conservation and Recovery Act [RCRA], Comprehensive Environmental Response, Compensation, and Liability Act, and State Waste Discharge Permits), constituents, monitoring frequencies, and boundaries require regular review and comparison. The annual reports discussed here are the primary sources for these reviews. The pathways of interest are air and groundwater for both operational and post-closure conditions at the LLBG, with groundwater considered to be the most significant long-term exposure pathway. Constituents that contributed at least 0.1% of the total relative hazard were selected as target analytes for monitoring. These are technetium-99, uranium, and iodine-129. Because of its environmental unavailability, carbon 14 was removed from the list of constituents. Given the potential uncertainties in inventories at the 200 Area LLBG and the usefulness of tritium as a contaminant indicator, tritium will be monitored as a constituent of concern at all burial grounds. Preexisting contamination plumes in groundwater beneath low-level waste management areas are attributed to other past-practice liquid waste disposal sites. Groundwater and air will be sampled and analyzed for radiogenic components. Subsidence monitoring will also be performed on a regular basis. The existing near-facility and surveillance air monitoring programs are sufficient to satisfy the performance assessment monitoring. Groundwater monitoring will utilize the existing network of wells at the LLBG, and co-sampling with RCRA groundwater monitoring, to be sampled semiannually. Installation of additional wells is currently underway to replace wells that have gone dry.

None

2006-03-30T23:59:59.000Z

37

Propeller Flow Meter  

E-Print Network (OSTI)

Propeller flow meters are commonly used to measure water flow rate. They can also be used to estimate irrigation water use. This publication explains how to select, install, read and maintain propeller flow meters....

Enciso, Juan; Santistevan, Dean; Hla, Aung K.

2007-10-01T23:59:59.000Z

38

Economics of Energy Metering  

E-Print Network (OSTI)

history of industrial usage and their mechanical simplicity. The Flow Technology Group divided orifice meters into three basic types -- Class A, B, and C. Class A meters are the ultimate current technology can provide. Their overall accuracy is ~l... cost for a Class A orifice is $45,000, excluding the computer cost. Class B meters have an accuracy of +2%. The transmitter analog outputs are usually recorded on charts. These meters are used for utilities accounting and non critical production...

Duncan, J. D.

1979-01-01T23:59:59.000Z

39

Fukushima-derived radionuclides in ground-level air of Central Europe: a comparison with simulated forward and backward trajectories  

Science Journals Connector (OSTI)

Results of forward and backward modeling of air mass transport from Fukushima Daiichi nuclear power plant to Slovakia were...131I, 134Cs and 137Cs) were observed in the Bratislava ground-level air in MarchApril ...

P. P. Povinec; I. Skora; M. Gera; K. Hol

2013-02-01T23:59:59.000Z

40

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EPAct 2005 Metering Guidance Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPAct 2005 Metering Guidance EPAct 2005 Metering Guidance Overview Dave Hunt Pacific Northwest National Laboratory Section 103 Requirements * What to meter - Building electric usage - All buildings * How to meter - Standard meters - Advanced meters * When - by 10/1/2012 FEMP's Response * Metering guidance document * Agency planning workshops * Metering training course * Metering Best Practices Guide (FY 2007) Important Dates * August 3, 2006 - agency plans due * As determined by individual agencies - site metering plans * October 1, 2012 - compliance deadline Issues * Funding * Practicability * EPAct time-based rate schedule * Agency policies/guidance Potential Roles for Utilities * Guidance/updates on time-based pricing * Metering services * Finance installations * Other? Useful Documents

42

Engineering assessment of low-level liquid waste disposal caisson locations at the 618-11 Burial Grounds  

SciTech Connect

Rockwell Hanford Operations is currently involved in an extensive effort to perform interim ground surface stabilization activities at retired low-level waste burial grounds located at the Hanford Site, Richland, Washington. The principal objective of these activities is to promote increased occupational and radiological safety at burial grounds. Interim stabilization activities include: (1) load testing (traversing burial ground surfaces with heavy equipment to promote incipient collapse of void spaces within the disposal structure and overburden), (2) barrier placement (placement of a {ge} 0.6 m soil barrier over existing overburden), and (3) revegetation (establishment of shallow rooted vegetation on the barrier to mitigate deep rooted plant growth and to reduce erosion). Low-level waste disposal caissons were used in 300 Area Burial Grounds as internment structures for containerized liquid wastes. These caissons, by virtue of their contents, design and methods of closure, require long-term performance evaluation. As an initial activity to evaluate long-term performance, the accurate location of these structures is required. This topical report summarizes engineering activities used to locate caissons in the subsurface environment at the Burial Ground. Activities were conducted to locate caissons during surface stabilization activities. The surface locations were marked, photographed, and recorded on an as built engineering drawing. The recorded location of these caissons will augment long-term observations of confinement structure and engineered surface barrier performance. In addition, accurate caisson location will minimize occupational risk during monitoring and observation activities periodically conducted at the burial ground.

Phillips, S.J.; Fischer, D.D.; Crawford, R.C. [Westinghouse Hanford Co., Richland, WA (United States); Rising, J.L. [Pacific Northwest Lab., Richland, WA (United States)

1982-06-01T23:59:59.000Z

43

Federal Energy Management Program: Metering  

NLE Websites -- All DOE Office Websites (Extended Search)

Metering Metering Historically, the Federal sector has lagged in metering applications. It is not uncommon to find one meter serving hundreds of Federal facilities. These master meters make it very difficult to manage energy use and are a primary driver for Federal metering requirements. To help Federal agencies meet these requirements, this section outlines strategies and resources surrounding metering best practices, including: Metering Systems: Overview of metering system capabilities and functionality as well as common components across various metering systems. Metering Approaches: Description of the four primary approaches to metering, including required equipment common for each approach. Metering Process: Outline of the five step process typically used to evaluate, design, install, and implement Federal metering programs.

44

Ground Level Enhancement in the 2014 January 6 Solar Energetic Particle Event  

E-Print Network (OSTI)

We present a study of the 2014 January 6 solar energetic particle (SEP) event, which produced a small ground level enhancement (GLE), making it the second GLE of this unusual solar cycle 24. This event was primarily observed by the South Pole neutron monitors (increase of ~2.5%) whereas a few other neutron monitors recorded smaller increases. The associated coronal mass ejection (CME) originated behind the western limb and had the speed of 1960 km/s. The height of the CME at the start of the associated metric type II radio burst, which indicates the formation of a strong shock, was measured to be 1.61 Rs using a direct image from STEREO-A/EUVI. The CME height at the time of GLE particle release (determined using the South Pole neutron monitor data) was directly measured as 2.96 Rs, from the STEREO-A/COR1 white-light observations. These CME heights are consistent with those obtained for the GLE71, the only other GLE of the current cycle as well as cycle-23 GLEs derived using back-extrapolation. GLE72 is of spe...

Thakur, N; Xie, H; Makela, P; Davila, S Yashiro S Akiyama J M

2014-01-01T23:59:59.000Z

45

Energy Metering Audit Procedure  

E-Print Network (OSTI)

Energy Meterilg Audtt Procedure Wiliam S Whitaker Engineering Specialist T X E INC. laPorte Texas INTROOUCI'ION This paper describes the recent audit of the utility distriooticn meters in a petrochanica1 plant. These meters measure the steam..., cx:ndensate, natural gas, water, nitrogen and air flCMS to the different process units within the plant. This audit started as an attellPt to resolve discrepan::ies between the 650 PSIG steam distriootion and supply meters. Theoretically the sum...

Whitaker, W. S.

46

Federal Energy Management Program: Metering  

NLE Websites -- All DOE Office Websites (Extended Search)

Metering to Metering to someone by E-mail Share Federal Energy Management Program: Metering on Facebook Tweet about Federal Energy Management Program: Metering on Twitter Bookmark Federal Energy Management Program: Metering on Google Bookmark Federal Energy Management Program: Metering on Delicious Rank Federal Energy Management Program: Metering on Digg Find More places to share Federal Energy Management Program: Metering on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency Data Center Energy Efficiency Industrial Facilities

47

Meter Expansion Plan Existing Multi-Space Meter  

E-Print Network (OSTI)

Meter Expansion Plan 11 35 9 7 10 20 12 11 12 46 23 15 15 60 23 Existing Multi-Space Meter Split Regulations 136 New Multi-Space Meter Visitor Only New Multi-Space Meter Split Regulations KEY 97 Updated 7/8/13 11 5 #12;HAVE.HAVE. UNION DR. 1 2 3 4 5 New Multi-space Meter After: 5 Meter Spaces Regulations

Duchowski, Andrew T.

48

Utility Metering - AGL Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AGL Resources AGL Resources Mike Ellis Director, AGL Energy Services Federal Utility Partnership Working Group Spring 2013 - May 22-23 San Francisco, CA Hosted by: Pacific Gas and Electric Company  Multiple LDCs with legacy metering equipment  Several use Itron 100G technology ◦ Mobile, once-a-month data collection ◦ Meter can store interval data for >30 days ◦ Meter technology could be leverage on fixed-base network, however there are no current plans for upgrade  Technology for capturing interval data is installed on case by case basis ◦ Customers on Interruptible Rate ◦ Large users  Electronic corrector installed on the meter ◦ Pressure and Temperature compensation  Typically data is retrieved once a day ◦ Transmission frequency impacts battery life

49

Net Metering Resources  

Energy.gov (U.S. Department of Energy (DOE))

State net metering policies allow customers to produce onsite electricity and sell excess generation to the utility at a set price, which creates an incentive for private investment in distributed...

50

NASA's Metering Plan  

Energy Savers (EERE)

4 May '06 Response to Response to EPAct EPAct * Agency-Wide (17 sites) * All Energy Utilities * Potable Water * E-Survey (all sites) * Physical Survey (3 sites) * Metering...

51

Ashland Electric- Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

In 1996, Ashland adopted a net-metering program that includes simple interconnection guidelines. The program encourages the adoption of renewable-energy systems by committing the city to purchase,...

52

Advanced Metering Infrastructure  

SciTech Connect

The report provides an overview of the development of Advanced Metering Infrastructure (AMI). Metering has historically served as the cash register for the utility industry. It measured the amount of energy used and supported the billing of customers for that usage. However, utilities are starting to look at meters in a whole different way, viewing them as the point of contact with customers in supporting a number of operational imperatives. The combination of smart meters and advanced communications has opened up a variety of methods for utilities to reduce operating costs while offering new services to customers. A concise look is given at what's driving interest in AMI, the components of AMI, and the creation of a business case for AMI. Topics covered include: an overview of AMI including the history of metering and development of smart meters; a description of the key technologies involved in AMI; a description of key government initiatives to support AMI; an evaluation of the current market position of AMI; an analysis of business case development for AMI; and, profiles of 21 key AMI vendors.

NONE

2007-10-15T23:59:59.000Z

53

Prediction of In-Cloud Icing Conditions at Ground Level Using the WRF Model  

Science Journals Connector (OSTI)

In-cloud icing on aircraft and ground structures can be observed every winter in many countries. In extreme cases ice can cause accidents and damage to infrastructure such as power transmission lines, telecommunication towers, wind turbines, ski ...

Bjrn Egil Kringlebotn Nygaard; Jn Egill Kristjnsson; Lasse Makkonen

2011-12-01T23:59:59.000Z

54

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Massachusetts Program Type Net Metering Provider Department of Public Utilities In Massachusetts, the state's investor-owned utilities must offer net metering. Municipal utilities are not obligated to offer net metering, but they may do so voluntarily. (There are no electric cooperatives in Massachusetts.) Class I, Class II, Class III net metering facilities In Massachusetts, there are several categories of net-metering facilities.

55

Shared Signals: Using Existing Facility Meters for Energy Savings Verification  

E-Print Network (OSTI)

energy conservation projects. (2) These guidelines provide monitoring and verification options that have different levels of accuracy and cost. They are specifically designed for energy savings performance contracts and are designed to provide... with a fair degree of accuracy. The costs of using existing meters are often not as clear. Obviously, if an existing meter is used, the costs of purchasing new metering equipment is avoided. However, using an existing meter is not free of costs...

McBride, J. R.; Bohmer, C. J.; Price, S. D.; Carlson, K.; Lopez, J.

56

Neutron dose equivalent meter  

DOE Patents (OSTI)

A neutron dose equivalent detector for measuring neutron dose capable of accurately responding to neutron energies according to published fluence to dose curves. The neutron dose equivalent meter has an inner sphere of polyethylene, with a middle shell overlying the inner sphere, the middle shell comprising RTV.RTM. silicone (organosiloxane) loaded with boron. An outer shell overlies the middle shell and comprises polyethylene loaded with tungsten. The neutron dose equivalent meter defines a channel through the outer shell, the middle shell, and the inner sphere for accepting a neutron counter tube. The outer shell is loaded with tungsten to provide neutron generation, increasing the neutron dose equivalent meter's response sensitivity above 8 MeV.

Olsher, Richard H. (Los Alamos, NM); Hsu, Hsiao-Hua (Los Alamos, NM); Casson, William H. (Los Alamos, NM); Vasilik, Dennis G. (Los Alamos, NM); Kleck, Jeffrey H. (Menlo Park, CA); Beverding, Anthony (Foster City, CA)

1996-01-01T23:59:59.000Z

57

Efficient Metering Schemes with Pricing  

E-Print Network (OSTI)

Efficient Metering Schemes with Pricing Barbara Masucci Dipartimento di Informatica ed Applicazioni and Pinkas [7] introduced metering schemes. They proposed metering schemes in which any server is able and proposed metering schemes with pricing. In their schemes any server is able to construct a proof which

Stinson, Douglas

58

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Home Weatherization Program Info State Arkansas Program Type Net Metering Provider Arkansas Economic Development Commission In April 2001, Arkansas enacted legislation (HB 2325) directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems.* The PSC approved final rules for net metering in July 2002. Subsequent legislation enacted in April 2007 (HB 2334) expanded the availability of net metering; increased the capacity

59

Elbow mass flow meter  

DOE Patents (OSTI)

Elbow mass flow meter. The present invention includes a combination of an elbow pressure drop generator and a shunt-type mass flow sensor for providing an output which gives the mass flow rate of a gas that is nearly independent of the density of the gas. For air, the output is also approximately independent of humidity.

McFarland, Andrew R. (College Station, TX); Rodgers, John C. (Santa Fe, NM); Ortiz, Carlos A. (Bryan, TX); Nelson, David C. (Santa Fe, NM)

1994-01-01T23:59:59.000Z

60

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Presentationgiven at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meetingcovers the 42 USC 8253 Energy Management Requirement; Executive Order 13514(g) High-Performance Sustainable Federal Buildings; federal metering needs, history, and status; and utility/agency opportunities.

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Energy Sub-Metering Equipment and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Sub-Metering Equipment and Applications Energy Sub-Metering Equipment and Applications Speaker(s): Sim Gurewitz Date: July 24, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Paul Mathew This talk will address the following topics:Submetering basics: What is it? How does a submeter work?How to obtain a finer level of energy information within the buildingApplications: Who submeters and why?LEED NC/EB/CS and submetering / Energy & Atmosphere pointsSubmetering equipment: gas, electric, water, steam, CW Btu and HHW BtuHow to install equipment without scheduling an outageLoad Control option for automated load shedding and peak shavingWireless submeters and communication options / integration to EMS-BMCSAutomatic remote meter reading and cost allocation softwarePutting it all together into a metering SYSTEM: read from anywhere, IP

62

Metering Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Systems Systems Metering Systems October 7, 2013 - 9:23am Addthis A variety of metering systems are currently on the market for Federal facility implementation. The information below outlines common metering system capabilities and common metering system components. Metering System Capabilities The capabilities and functionality of metering systems vary depending on the individual metering system. The following are some of the more common features used by Federal facilities. Data Recording: Advanced meters can record total energy resource consumption in addition to enhanced functions like time-of-use, peak demand, load survey, and power outage. Electrical meters may also be able to record data points such as voltage, current, and power factor. Total Consumption: The most basic data function, total consumption records

63

Flow metering valve  

DOE Patents (OSTI)

An apparatus for metering fluids at high pressures of about 20,000 to 60,000 psi is disclosed. The apparatus includes first and second plates which are positioned adjacent each other to form a valve chamber. The plates are made of materials which have substantially equal elastic properties. One plate has a planar surface area, and the other a recessed surface area defined by periphery and central lips. When the two plates are positioned in adjacent contacting relationship, a valve chamber is formed between the planar surface area and the recessed surface area. Fluid is introduced into the chamber and exits therefrom when a deformation occurs at positions where they no longer form a valve seat. This permits the metering of fluids at high pressures and at slow variable rates. Fluid then exits from the chamber until an applied external force becomes large enough to bring the valve seats back into contact.

Blaedel, Kenneth L. (Dublin, CA)

1985-01-01T23:59:59.000Z

64

Flow metering valve  

DOE Patents (OSTI)

An apparatus for metering fluids at high pressures of about 20,000 to 60,000 psi is disclosed. The apparatus includes first and second plates which are positioned adjacent each other to form a valve chamber. The plates are made of materials which have substantially equal elastic properties. One plate has a planar surface area, and the other a recessed surface area defined by periphery and central lips. When the two plates are positioned in adjacent contacting relationship, a valve chamber is formed between the planar surface area and the recessed surface area. Fluid is introduced into the chamber and exits therefrom when a deformation occurs at positions where they no longer form a valve seat. This permits the metering of fluids at high pressures and at slow variable rates. Fluid then exits from the chamber until an applied external force becomes large enough to bring the valve seats back into contact.

Blaedel, K.L.

1983-11-03T23:59:59.000Z

65

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Industrial Residential Fed. Government Institutional Local Government Multi-Family Residential Nonprofit Schools State Government Savings Category Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State District of Columbia Program Type Net Metering Provider Washington State University Washington's net-metering law applies to systems up to 100 kilowatts (kW) in capacity that generate electricity using solar, wind, hydro, biogas from animal waste, or combined heat and power technologies (including fuel cells). All customer classes are eligible, and all utilities -- including municipal utilities and electric cooperatives -- must offer net metering.

66

A microwave impedance meter  

E-Print Network (OSTI)

A MICROWAVE IMPEDANCE METER A Thesis Virgil Layfaette 8oaz Submitted to the Graduate School of the Agricultural and Mechanical College oi' Texas in partial fulfillment of the requirements for the degree of MASTER OF SC I ENCE August 1 g61... and advice of Dr. J. P, German who suggested the research proj ct and rendered assistance when necessary. Further thanks are extended to the Electrical Engineering Faculty and Staff for their patience and suggestions, 1v CONTENTS LIST OF FIGURES...

Boaz, Virgil Layfaette

2012-06-07T23:59:59.000Z

67

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State Vermont Program Type Net Metering Provider Vermont Department of Public Service NOTE: Legislation enacted in May 2012 (HB475) further amends Vermont's net metering policy. Vermont's original net-metering legislation was enacted in 1998, and the law has been expanded several times subsequently. Any electric customer in Vermont may net meter after obtaining a Certificate of Public Good from the Vermont Public Service Board (PSB). Solar net metered systems 10 kilowatts

68

Metering Systems | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

categories: electrical and flow-related. Electrical meters can track whole-building energy use (e.g., utility meters), sub-panel energy use (e.g., lighting), or a specific end...

69

Ground level concentration of sulfur dioxide at Kuwait`s major population centers during the oil-field fires  

SciTech Connect

During the Iraqi occupation, Kuwait`s oil wells were ignited. the fires were damaging to the country`s oil resources and air quality. The impact of the oil-field fires on the air quality was studied to determine the level of exposure to pollutants in major population centers. The period of July-September 1991 was selected for examination. A mathematical model was used to compute the ground-level concentration isopleths. The results of these computations are supported by significant concentrations measured and reported by the Environmental Protection Council, Kuwait. The ground-level concentrations of sulfur dioxide in the major population centers, whether measure or estimated, were less than the ambient standards of the U.S. Environmental Protection Agency`s air pollution index. The dispersive characteristics were classified according to wind conditions. The results of this assessment provide historical data on Kuwait`s oil fires and may be useful in assessing risks resulting from this catastrophe. 6 refs., 10 fig., 2 tab.

Al-Ajmi, D.N.; Marmoush, Y.R. [Kuwait Institute for Scientific Research (Kuwait)] [Kuwait Institute for Scientific Research (Kuwait)

1996-08-01T23:59:59.000Z

70

Ground-penetrating radar survey of the Maxey Flats Low-Level Nuclear Waste Disposal Site, Fleming County, Kentucky  

SciTech Connect

A ground-penetrating radar survey was conducted at the Maxey Flats Low-Level Nuclear Waste Disposal Site, Kentucky, to more accurately determine the location of burial trenches and pits, and to identify locations and depths of any prominent subsurface features. A geologic/electromagnetic model of the site was developed and utilized for analysis of the acquired data. Depths of penetration derived from radar records correlate well with those calculated from the model. A final interpretation of the radar data is presented.

Horton, K.A.; Morey, R.M.

1982-06-01T23:59:59.000Z

71

DSW_RMR Meter Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION Metering Policy Desert Southwest and Rocky Mountain Regions August 08, 2012 Western Meter Policy DSW and RMR Regions Version 1.0 08/08/2012 2 | P a g e Contents 1. Purpose......................................................................................................................................4 2. Scope .........................................................................................................................................4 3. General Meter Policy Requirements ............................................................................................5 4. Western Owned Facilities ............................................................................................................... 6

72

Technology, Safety and Costs of Decommissioning a Reference Low-Level Waste Burial Ground Environmental Surveillance Programs  

SciTech Connect

This Addendum supplements, and to some extent replaces, the preliminary description of environmental radiological surveillance programs for low-level waste burial grounds (LLWBG) used in the parent document, 11 Technology, Safety and Costs of DecolliTlissioning a Reference Low-Level Waste Burial Ground, 11 NUREG/ CR-0570. The Addendum provides additional detail and rationale for the environmental radiological surveillance programs for the two referenced sites and inventories described in NUREG/CR-0570. The rationale and performance criteria herein are expected to be useful in providing guidance for determining the acceptability of environmental surveillance programs for other inventories and other LLWBG sites. Two generic burial grounds, one located on an arid western site and the other located on a humid eastern site, are reference facilities considered in this Addendum, and as described in the parent document (NUREG/CR-0570). The two sites are assumed to have the same capacity for waste, the same radioactive waste inventory, and similar trench characteristics and operating procedures. The climate, geology, and hydrology of the two reference sites are typical of existing western and eastern sites, altnough a single population distribution was chosen for both. Each reference burial ground occupies about 70 hectares and includes 180 trenches filled with a total of 1.5 x 10{sup 6} m{sup 3} of radioactive waste. In acldition, there are 10 slit trenches containing about 1.5 x 10{sup 3} m{sup 3} of high beta-gamma activity waste. In this Addendum environmental surveillance programs are described for the several periods in the life of a LLWBG: preoperational (prior to nuclear waste receipt); operational (including interim trench closures); post-operational (after all nuclear waste is received), for both short-term {up to three years) and long-term (up to 100 years) storage and custodial care; and decommissioning (only for the special case of waste removal). The specific environmental monitoring requirements for final site characterization and certification surveys are beyond the scope of this Addendum. Data collection associated with site reconnaissance and preselection is not specifically addressed, but it is recognized that such data may be useful in designing the preoperational program. Predisposal control measures, quality assurance, and record-keeping (other than inventory records) associated with waste disposal operations are also not addressed. The primary intent of routine environmental surveillance at a LLWBG is to help ensure that site activities do not cause significant transport of radioactivity from the site, resulting in an unacceptable health hazard to people. Preoperational environmental surveillance serves to determine for later comparison the background radioactivity levels, either naturally occurring or the result of man's activities (e.g. world-wide fallout or an adjacent nuclear facility), in and around the proposed burial ground site. The operational environmental surveillance program is used to estimate radiological conditions, both onsite and offsite as a possible result of burial ground activities, including trench closure(s). These data help to determine LLWBG compliance with regulatory requirements. During the post-operational period environmental surveillance should normally be an extension of the program carried out during operations, with appropriate deletions (or modifications) to account for the differences between operational and post-operational activities at the site. During the long-term storage and custodial care period, environmental surveillance serves to verify the radionuclide confinement capability of the burial ground and to identify problem situations requiring remedial action. For waste removal (exhumation), the environmental surveillance program is again modified to account for the greatly increased potential for direct radiation and contamination spread. At the time of decommissioning, "environmental surveillance" takes on a new meaning, from that of an ongoing prog

Denham, D. H.; Eddy, P. A.; Hawley, K. A.; Jaquish, R. E.; Corley, J. P.

1981-07-01T23:59:59.000Z

73

Portable wastewater flow meter  

DOE Patents (OSTI)

A portable wastewater flow meter particularly adapted for temporary use at a single location in measuring the rate of liquid flow in a circular entrance conduit of a sewer manhole both under free flow and submerged, open channel conditions and under fill pipe, surcharged conditions, comprising an apparatus having a cylindrical external surface and an inner surface that constricts the flow through the apparatus in such a manner that a relationship exists between (1) the difference between the static pressure head of liquid flowing through the entrance of the apparatus and the static pressure head of liquid flowing through the constriction, and (2) the rate of liquid flow through the apparatus.

Hunter, Robert M. (320 S. Wilson Ave., Bozeman, MT 59715)

1999-02-02T23:59:59.000Z

74

Portable wastewater flow meter  

DOE Patents (OSTI)

A portable wastewater flow meter particularly adapted for temporary use at a single location in measuring the rate of liquid flow in a circular entrance conduit of a sewer manhole both under free flow and submerged, open channel conditions and under full pipe, surcharged conditions, comprising an apparatus having a cylindrical external surface and an inner surface that constricts the flow through the apparatus in such a manner that a relationship exists between (1) the difference between the static pressure head of liquid flowing through the entrance of the apparatus and the static pressure head of liquid flowing through the constriction, and (2) the rate of liquid flow through the apparatus.

Hunter, Robert M. (320 S. Wilson Ave., Bozeman, MT 59715)

1990-01-01T23:59:59.000Z

75

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State North Carolina Program Type Net Metering Provider North Carolina Utilities Commission The North Carolina Utilities Commission (NCUC) requires the state's three investor-owned utilities -- Duke Energy, Progress Energy and Dominion North Carolina Power -- to make net metering available to customers that own and operate systems that generate electricity using solar energy, wind energy, hydropower, ocean or wave energy, biomass resources, combined heat and

76

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Missouri Program Type Net Metering Provider Missouri Public Service Commission Missouri enacted legislation in June 2007 (S.B. 54)* requiring all electric utilities -- investor-owned utilities, municipal utilities and electric cooperatives -- to offer net metering to customers with systems up to 100 kilowatts (kW) in capacity that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells

77

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Home Weatherization Water Wind Program Info State Maryland Program Type Net Metering Provider Maryland Public Service Commission Note: The program web site listed above links to the Maryland Public Service Commission's Net Metering Working Group page, which contains a variety of information resources related to the ongoing implementation of net metering in Maryland, such as meeting agendas, minutes, and draft utility tariffs.

78

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Solar Home Weatherization Program Info State District of Columbia Program Type Net Metering Provider DC Public Service Commission In the District of Columbia (DC), net metering is currently available to residential and commercial customer-generators with systems powered by renewable-energy sources, combined heat and power (CHP), fuel cells and microturbines, with a maximum capacity of 1 megawatt (MW). The term "renewable energy sources" is defined as solar, wind, tidal, geothermal, biomass, hydroelectric power and digester gas. In October 2008, the Clean

79

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Net Metering Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

80

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Virginia Program Type Net Metering Provider Virginia Department of Mines, Minerals, and Energy '''''Note: In March 2011, Virginia enacted HB 1983, which increased the residential net-metering limit to 20 kW. However, residential facilities with a capacity of greater than 10 kW must pay a monthly standby charge. The Virginia State Corporation Commission approved standby charges for transmissions and distribution components as proposed by Virginia Electric and Power Company (Dominion Virginia Power) on November 3, 2011.'''''

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Industrial Residential Local Government Multi-Family Residential Nonprofit Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State West Virginia Program Type Net Metering Provider West Virginia Public Service Commission Net metering in West Virginia is available to all retail electricity customers. System capacity limits vary depending on the customer type and electric utility type, according to the following table. Customer Type IOUs with 30,000 customers or more IOUs with fewer than 30,000 customers, municipal utilities, electric cooperatives

82

Improvements in Shallow (Two-Meter) Temperature Measurements and Data  

Open Energy Info (EERE)

Improvements in Shallow (Two-Meter) Temperature Measurements and Data Improvements in Shallow (Two-Meter) Temperature Measurements and Data Interpretation Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Improvements in Shallow (Two-Meter) Temperature Measurements and Data Interpretation Abstract The Great Basin Center for Geothermal Energy has been working on improvements in shallow (two-meter) temperature surveys in two areas: overcoming limitations posed by difficult ground conditions with the use of a portable rock drill, and improvements in temperature measurements and interpretations Previous 2-meter temperature surveys conducted by the Great Basin Center for Geothermal Energy have been limited to areas that were not excessively rocky. This limitation has been overcome by the use of a

83

Performance assessment for the disposal of low-level waste in the 200 West Area Burial Grounds  

SciTech Connect

This document reports the findings of a performance assessment (PA) analysis for the disposal of solid low-level radioactive waste (LLW) in the 200 West Area Low-Level Waste Burial Grounds (LLBG) in the northwest corner of the 200 West Area of the Hanford Site. This PA analysis is required by US Department of Energy (DOE) Order 5820.2A (DOE 1988a) to demonstrate that a given disposal practice is in compliance with a set of performance objectives quantified in the order. These performance objectives are applicable to the disposal of DOE-generated LLW at any DOE-operated site after the finalization of the order in September 1988. At the Hanford Site, DOE, Richland Operations Office (RL) has issued a site-specific supplement to DOE Order 5820.2A, DOE-RL 5820.2A (DOE 1993), which provides additiona I ce objectives that must be satisfied.

Wood, M.I.; Khaleel, R.; Rittmann, P.D.; Lu, A.H.; Finfrock, S.H.; DeLorenzo, T.H. [Westinghouse Hanford Co., Richland, WA (United States); Serne, R.J.; Cantrell, K.J. [Pacific Northwest Lab., Richland, WA (United States)

1995-06-01T23:59:59.000Z

84

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Solar Home Weatherization Water Program Info State New York Program Type Net Metering Provider New York State Department of Public Service Note: In October 2012 the New York Public Service Commission (PSC) issued an order directing Central Hudson Gas and Electric to file net metering tariff revisions tripling the aggregate net metering cap for most systems from 1% of 2005 peak demand (12 MW) to 3% of 2005 peak demand (36 MW). The PSC issued another order in June 2013 to raise the aggregate net metering cap

85

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Wind Solar Home Weatherization Program Info State Illinois Program Type Net Metering Provider Illinois Commerce Commission '''''NOTE: Legislation enacted in 2011 and 2012 (S.B. 1652, H.B. 3036, and S.B. 3811) has changed several aspects of net metering in Illinois. For customers in competitive classes as of July 1, 2011, the law prescribes a dual metering and bill crediting system which does not meet the definition of net metering as the term is generally defined. Click here for information regarding competitive classes, and

86

Net Metering | Open Energy Information  

Open Energy Info (EERE)

Metering Metering Jump to: navigation, search For electric customers who generate their own electricity, net metering allows for the flow of electricity both to and from the customer,– typically through a single, bi-directional meter. With net metering, when a customer’'s generation exceeds the customer’'s use, the customer's electricity flows back to the grid, offsetting electricity consumed by the customer at a different time. In effect, the customer uses excess generation to offset electricity that the customer otherwise would have to purchase at the utility’'s full retail rate. Net metering is required by law in most states, but some of these laws only apply to investor-owned utilities,– not to municipal utilities or electric cooperatives. [1] Net Metering Incentives

87

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial General Public/Consumer Industrial Residential Fed. Government Local Government State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Oklahoma Program Type Net Metering Provider Oklahoma Corporation Commission Net metering has been available in Oklahoma since 1988 under Oklahoma Corporation Commission (OCC) Order 326195. The OCC's rules require investor-owned utilities and electric cooperatives under the commission's jurisdiction* to file net-metering tariffs for customer-owned renewable-energy systems and combined-heat-and-power (CHP) facilities up to 100 kilowatts (kW) in capacity. Net metering is available to all customer

88

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Wind Solar Home Weatherization Program Info State Ohio Program Type Net Metering Provider Ohio Public Utilities Commission '''''Note: In July 2012, the Public Utilities Commission of Ohio (PUCO) opened a docket ([http://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=12-2050-EL-ORD Case 12-0250-EL-RDR]) to review the net metering rules for investor-owned utilities. Details will be posted as more information is available.''''' Ohio's net-metering law requires electric distribution utilities to offer net metering to customers who generate electricity using wind energy, solar energy, biomass, landfill gas, hydropower, fuel cells or microturbines.

89

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Solar Home Weatherization Program Info State New Mexico Program Type Net Metering Provider New Mexico Public Regulation Commission Net metering is available to all "qualifying facilities" (QFs), as defined by the federal Public Utility Regulatory Policies Act of 1978 (PURPA)*, which pertains to systems up to 80 megawatts (MW) in capacity. Previously, net metering in New Mexico was limited to systems up to 10 kilowatts (kW) in capacity. Net-metered customers are credited or paid for any monthly net excess generation (NEG) at the utility's avoided-cost rate. If a customer has net

90

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Net Metering Net Metering < Back Eligibility Commercial Fed. Government Local Government Residential State Government Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Hawaii Program Type Net Metering Provider Hawaii Public Utilities Commission NOTE: Kauai Island Electric Cooperative's (KIUC) net metering program has reached its capacity and has implemented a Net Energy Metering Pilot Program. Hawaii's original net-metering law was enacted in 2001 and expanded in 2004 by HB 2048, which increased the eligible capacity limit of net-metered systems from 10 kilowatts (kW) to 50 kW. In 2005, the law was further amended by SB 1003, which authorized the Hawaii Public Utilities Commission

91

Reducing the contribution of the power sector to ground-level ozone pollution : an assessment of time-differentiated pricing of nitrogen oxide emissions  

E-Print Network (OSTI)

Nitrogen oxide (NOx) is a prevalent air pollutant across the United States and a requisite precursor for tropospheric (ground-level) ozone formation. Both pollutants significantly impact human health and welfare, so National ...

Craig, Michael T. (Michael Timothy)

2014-01-01T23:59:59.000Z

92

Uncertainty propagation in a model for the estimation of the1 ground level concentration of dioxin/furans emitted from a waste2  

E-Print Network (OSTI)

Uncertainty propagation in a model for the estimation of the1 ground level concentration of dioxin concentration of dioxin/furans emitted from a waste gasification plant. Under the17 condition of insufficient

Paris-Sud XI, Université de

93

Advanced Metering - Using advanced Metering to Improve Building...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

bills *Tenant energy use (sub metering) *Identifying best rates *Participating in demand response programs OptimizeReview performance *Diagnose equipment & systems operations...

94

Guidance for Electric Metering in Federal Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

blank. blank. Executive Summary The Energy Policy Act of 2005 (EPAct 2005), Section 103, requires all federal agencies to install metering and advanced metering where found to be cost-effective, according to guidelines developed by the Department of Energy (DOE), in consultation with a number of interest groups. DOE has met with representatives from the metering industry, the utility industry, energy services industry, energy efficiency industry, energy effi- ciency advocacy organizations, national laboratories, universities, and federal facility managers to develop the guidelines set forth in this document. There were several areas in the language of Section 103 that required some level of clarification prior to finaliz- ing these guidelines, as follows: * DOE has determined that Section 103 pertains to

95

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Energy Sources Solar Home Weatherization Wind Program Info State Minnesota Program Type Net Metering Provider Minnesota Department of Commerce '''''Note: H.F. 729, enacted in May 2013, includes many changes to Minnesota's net metering law. These changes are described above, but most will not take effect until rules are implemented at the PUC. The below summary reflects the current rules.''''' Minnesota's net-metering law, enacted in 1983, applies to all investor-owned utilities, municipal utilities and electric cooperatives. All "qualifying facilities" less than 40 kilowatts (kW) in capacity are

96

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Net Metering Provider Pennsylvania Public Utility Commission Note: In March 2012 the Pennsylvania Public Utilities Commission (PUC) issued a Final Order (Docket M-2011-2249441) approving the use of third-party ownership models (i.e., system leases or retail power purchase agreements) in conjunction with net metering. The Order allows these types of arrangements for net metered systems, subject to a restriction that the

97

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Net Metering Net Metering < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Iowa Program Type Net Metering Provider Iowa Utilities Board Iowa's statutes do not explicitly authorize the Iowa Utilities Board (IUB) to mandate net metering, but this authority is implicit through the board's enforcement of PURPA and Iowa Code § 476.41 ''et seq.'' Iowa's net-metering subrule, adopted by the IUB in July 1984, applies to customers that generate electricity using alternate energy production facilities (AEPs). Net metering is available to all customer classes of Iowa's two investor-owned utilities -- MidAmerican Energy and Interstate Power and

98

Electric Metering | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Electric Metering Electric Metering Saving Money by Saving Energy The Department of Energy has installed meters in the James Forrestal Building that will enable DOE to measure electricity use and costs in its headquarters facility. You may explore this data further by visiting our Forrestal Metering Dashboard at the following website: http://forrestal.nrel.gov The Forrestal electric meters provide daily read-outs and comparison of data on electricity consumption for overhead lighting and power outlets. The purpose is to measure the electricity used by equipment that building occupants can control. Data is collected and reported by zones throughout Forrestal's north, south and west buildings. See the Forrestal metering zone map, below, for details on the zones.

99

Ground-water levels and tritium concentrations at the Maxey Flats low-level radioactive waste disposal site near Morehead, Kentucky, June 1984 to April 1989  

SciTech Connect

The Maxey Flats disposal site, Kentucky encompasses about 280 acres near the edge of a flat-topped ridge. The ridge is underlain by fractured shale and sandstone beds of the Nancy Member and the Farmers Member of the Borden Formation of Mississippian age. Groundwater flow in the strata beneath the site occurs through fractures, and flow patterns are difficult to delineate. The potentiometric surface also is difficult to delineate because several saturated and unsaturated zones are present in the rocks. Generally, ground-water levels in wells intersecting permeable fractures fluctuated seasonally and were lowest from December through June and highest from July through November. Water levels in the disposal trenches fluctuations less than those in wells, and for most trenches the fluctuations were less than 0.5 foot. From June 1984 to April 1989, tritium concentrations in groundwater ranged from 0 to 2,402,200 picocuries/ml. The greatest and most variable tritium concentrations were in wells along the northwest side of the site. The major conduit of groundwater flow from the trenches in the northwestern part of the site is a fractured sandstone bed that forms the base of most trenches. Elsewhere along the site perimeter, elevated levels of tritium were not detected in wells, and mean tritium were not detected in wells, and mean tritium concentrations showed little change between 1986 and 1988.

Wilson, K.S.; Lyons, B.E. (Geological Survey, Reston, VA (United States))

1991-01-01T23:59:59.000Z

100

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Home Weatherization Program Info State Louisiana Program Type Net Metering Provider Louisiana Public Service Commission '''''Note: Ongoing proceedings related to net metering can be found in Docket R-31417.''''' Louisiana enacted legislation in June 2003 establishing net metering. Modeled on Arkansas's law, Louisiana's law requires investor-owned utilities, municipal utilities and electric cooperatives to offer net metering to customers that generate electricity using solar, wind, hydropower, geothermal or biomass resources. Fuel cells and microturbines that generate electricity entirely derived from renewable resources are

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Net Metering Provider Public Utilities Regulatory Authority Connecticut's two investor-owned utilities -- Connecticut Light and Power Company (CL&P) and United Illuminating Company (UI) -- are required to provide net metering to customers that generate electricity using "Class I" renewable-energy resources, which include solar, wind, landfill gas, fuel

102

O&M Metering Guidance  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the O&M Metering Guidance and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

103

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agricultural Agricultural Commercial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kentucky Program Type Net Metering Provider Kentucky Public Service Commission In April 2008, Kentucky enacted legislation that expanded its net metering law by requiring utilities to offer net metering to customers that generate electricity with photovoltaic (PV), wind, biomass, biogas or hydroelectric systems up to 30 kilowatts (kW) in capacity. The Kentucky Public Service Commission (PSC) issued rules on January 8, 2009. Utilities had 90 days from that date to file tariffs that include all terms and conditions of their net metering programs, including interconnection.

104

Impact of orifice metering uncertainties  

SciTech Connect

In a recent utility study, attributed 38% of its unaccounted-for UAF gas to orifice metering uncertainty biasing caused by straightening vanes. How this was determined and how this applied to the company's orifice meters is described. Almost all (97%) of the company's UAF gas was found to be attributed to identifiable accounting procedures, measurement problems, theft and leakage.

Stuart, J.W. (Pacific Gas and Electric Co., San Francisco, CA (USA))

1990-12-01T23:59:59.000Z

105

Wavelength meter having elliptical wedge  

DOE Patents (OSTI)

A wavelength meter is disclosed which can determine the wavelength of a laser beam from a laser source within an accuracy range of two parts in 10.sup.8. The wavelength meter has wedge having an elliptically shaped face to the optical path of the laser source and includes interferometer plates which form a vacuum housing.

Hackel, Richard P. (Livermore, CA); Feldman, Mark (Livermore, CA)

1992-01-01T23:59:59.000Z

106

Wavelength meter having elliptical wedge  

DOE Patents (OSTI)

A wavelength meter is disclosed which can determine the wavelength of a laser beam from a laser source within an accuracy range of two parts in 10[sup 8]. The wavelength meter has wedge having an elliptically shaped face to the optical path of the laser source and includes interferometer plates which form a vacuum housing. 7 figs.

Hackel, R.P.; Feldman, M.

1992-12-01T23:59:59.000Z

107

Gerson Recinos Onramp Metering System  

E-Print Network (OSTI)

Gerson Recinos Onramp Metering System Using Arduino and Processing Overview­ For this project I built an Onramp Metering System using Arduino and Processing. The Microcontroller used was Arduino (based on Atmel168) and the programming languages were Processing and Wiring (derivative

Kachroo, Pushkin

108

Ground-water levels and tritium concentrations at the Maxey Flats low-level radioactive-waste-disposal site near Morehead, Kentucky, June 1984 to April 1989. Water - resources investigation  

SciTech Connect

The report, one in a series of reports by the USGS, summarizes ground-water level and tritium data that were collected by the USGS from June 1984 through April 1989. The report also describes the occurrence and distribution of tritium in water from selected wells. Data for ground-water levels in wells and disposal tranches and the concentrations of tritium in water from monitoring wells at the site are presented. Precipitation data were collected in conjunction with the water-level data to relate precipitation to ground-water recharge. Specific conductance data, routinely determined for ground-water samples, also were collected to compare changes in specific conductance to changes in tritium concentrations. All data are stored locally on the U.S. Geological Survey's National Water Information System (NWIS).

Wilson, K.S.; Lyons, B.E.

1991-01-01T23:59:59.000Z

109

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State New Jersey Program Type Net Metering Provider New Jersey Board of Public Utilities New Jersey's net-metering rules apply to all residential, commercial and industrial customers of the state's investor-owned utilities and energy suppliers (and certain competitive municipal utilities and electric cooperatives). Systems that generate electricity using solar, wind, geothermal, wave, tidal, landfill gas or sustainable biomass resources, including fuel cells (all "Class I" technologies under the state RPS), are

110

Metering Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Process Metering Process October 7, 2013 - 9:34am Addthis Developing and implementing a metering plan is highly dependent on the individual facility's needs, mission, metering equipment, and available infrastructure. One size does not fit all. The following guidelines outline the typical process for planning and implementing a metering program. Establish Program Goals and Objectives Establishing program goals and objectives is the critical first step for all metering programs. While the ultimate goal is usually measuring and lowering utility use or costs, the objectives needed to get this done varies. Examples of program objectives include: To fully enable energy bill allocation throughout the facility To effectively manage electric loads and minimize costs under a

111

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Net Metering Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Michigan Program Type Net Metering Provider Michigan Public Service Commission '''''The MPSC is reviewing state interconnection and net metering policies in [http://efile.mpsc.state.mi.us/efile/viewcase.php?casenum=15919&submit.x=... Case U-15919].''''' In October 2008, Michigan enacted legislation (P.A. 295) requiring the Michigan Public Service Commission (PSC) to establish a statewide net metering program for renewable-energy systems within 180 days. On May 26, 2009 the Michigan Public Service Commission (PSC) issued an order formally

112

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Colorado Program Type Net Metering Provider Colorado Public Utilities Commission [http://www.leg.state.co.us/clics/clics2009a/csl.nsf/fsbillcont3/571064D8... Senate Bill 51] of April 2009 made several changes, effective September 1, 2009, to the state's net metering rules for investor-owned utilities, as they apply to solar-electric systems. These changes include converting the maximum system size for solar-electric systems from two megawatts (MW) to 120% of the annual consumption of the site; redefining a site to include

113

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Net Metering < Back Eligibility Agricultural Commercial Industrial Residential Fed. Government General Public/Consumer Local Government Low-Income Residential Multi-Family Residential Nonprofit Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State California Program Type Net Metering Provider California Public Utilities Commission California's net-metering law originally took effect in 1996 and applies to all utilities with one exception*. The law has been amended numerous times since its enactment, most recently by AB 327 of 2013. '''Eligible Technologies''' The original law applied to wind-energy systems, solar-electric systems and hybrid (wind/solar) systems. In September 2002, legislation (AB 2228)

114

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Fuel Vehicles Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Delaware Program Type Net Metering Provider Delaware Public Service Commission In Delaware, net metering is available to any customer that generates electricity using solar, wind or hydro resources, anaerobic digesters, or fuel cells capable of being powered by renewable fuels. Grid-interactive electric vehicles are also eligible for net metering treatment for electricity that they put on the grid, although these vehicles do not themselves generate electricity. The maximum capacity of a net-metered system is 25 kilowatts (kW) for residential customers; 100 kW for farm customers on residential rates; two megawatts (MW) per meter for

115

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE 4,900 METERS NYLON LINE, CONTINUOUS 700 METERS KEO 1: DATE: DATE: MOORING: SCOPE: NOAA-PMEL-KE 1.4:1 TC5 METERS 700 METERS WIRE ROPE FAIRING TO 500 METERS TC10 METERS 50 METERS 25 METERS TC TC 75 METERS TC 100 METERS TP 150 METERS TC 200 METERS TC 300 METERS

116

Federal Energy Management Program: Metering Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Metering Systems Metering Systems to someone by E-mail Share Federal Energy Management Program: Metering Systems on Facebook Tweet about Federal Energy Management Program: Metering Systems on Twitter Bookmark Federal Energy Management Program: Metering Systems on Google Bookmark Federal Energy Management Program: Metering Systems on Delicious Rank Federal Energy Management Program: Metering Systems on Digg Find More places to share Federal Energy Management Program: Metering Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency

117

Low volume flow meter  

DOE Patents (OSTI)

The low flow monitor provides a means for determining if a fluid flow meets a minimum threshold level of flow. The low flow monitor operates with a minimum of intrusion by the flow detection device into the flow. The electrical portion of the monitor is externally located with respect to the fluid stream which allows for repairs to the monitor without disrupting the flow. The electronics provide for the adjustment of the threshold level to meet the required conditions. The apparatus can be modified to provide an upper limit to the flow monitor by providing for a parallel electronic circuit which provides for a bracketing of the desired flow rate.

Meixler, Lewis D. (East Windsor, NJ)

1993-01-01T23:59:59.000Z

118

Smart meters | Open Energy Information  

Open Energy Info (EERE)

meters meters Jump to: navigation, search Smart meters are part of the initiative to install a smart grid to better power the United States in the coming year, helping incorporate renewable energy technologies into the grid while also making the existing grid more efficient. About Smart Grid Smartgridlogo.png The purpose of smart meters is to aid development of the United States Smart Grid initiative. The purpose of Smart Grid "to support the modernization of the nation's electricity transmission and distribution system to maintain a reliable and secure electricity infrastructure, outlined in Title XIII of the Energy Independence and Security Act of 2007 (PDF 821 KB)." More in-depth information can be found at SmartGrid.gov. It is believed that the implementation of a new Smart Grid "will make our grid more secure

119

Electric Metering | Department of Energy  

Office of Environmental Management (EM)

has installed meters in the James Forrestal Building that will enable DOE to measure electricity use and costs in its headquarters facility. You may explore this data further by...

120

Valley Electric Association- Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

The Board of Directors for Valley Electric Association (VEA) approved net metering in April 2008. The rules apply to systems up to 30 kW, though owners of larger systems may be able to negotiate...

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Gamma radiation field intensity meter  

DOE Patents (OSTI)

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode. 4 figs.

Thacker, L.H.

1995-10-17T23:59:59.000Z

122

Gamma radiation field intensity meter  

DOE Patents (OSTI)

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode. 4 figs.

Thacker, L.H.

1994-08-16T23:59:59.000Z

123

Gamma radiation field intensity meter  

DOE Patents (OSTI)

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode.

Thacker, Louis H. (Knoxville, TN)

1995-01-01T23:59:59.000Z

124

Gamma radiation field intensity meter  

DOE Patents (OSTI)

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode.

Thacker, Louis H. (Knoxville, TN)

1994-01-01T23:59:59.000Z

125

START USING THE NEW ONLINE METER  

E-Print Network (OSTI)

START USING THE NEW ONLINE METER REQUEST FORM TOOL CAS login Logging in with your Princeton Net and convenient way for departments to send outgoing metered mail with Mail Services! The new Online Meter Request

Singh, Jaswinder Pal

126

BPA Metering Services Editing and Estimating Procedures  

NLE Websites -- All DOE Office Websites (Extended Search)

Editing and Estimating Interval Data 1. Introduction This section defines the meter interval data editing and estimation techniques performed by BPA's Metering Services...

127

DVS5.2 METERS 8 METERS OCR507, STOR-X DATA LOGGER  

E-Print Network (OSTI)

DVS5.2 METERS 10 METERS 8 METERS OCR507, STOR-X DATA LOGGER 16" BATTERY HOUSING TC INVERTED5 METERS 1" SAS INDUCTIVE CABLE BREAKOUT RADAR REFLECTOR OS PAPA RECOVERY HANDLE 1 METER-SBE 37 MICROCAT TC HUMIDITY (FLEX) CTD/GTD/O2 4 METERS WETLabs FLNTUSB FLUOROMETER DOUBLE NUT AND TORQUE ALL LOAD CELL NUTS

128

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agricultural Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Heating & Cooling Commercial Heating & Cooling Wind Program Info State Indiana Program Type Net Metering Provider Indiana Utility Regulatory Commission The Indiana Utility Regulatory Commission (IURC) adopted rules for net metering in September 2004, requiring the state's investor-owned utilities (IOUs) to offer net metering to all electric customers. The rules, which apply to renewable energy resource projects [defined by IC 8-1-37-4(a)(1) - (8)] with a maximum capacity of 1 megawatt (MW), include the following

129

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agricultural Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Oregon Program Type Net Metering Oregon has established separate net-metering programs for the state's primary investor-owned utilities (PGE and PacifiCorp), and for its municipal utilities and electric cooperatives. '''PGE and PacifiCorp Customers''' The Oregon Public Utilities Commission (PUC) adopted new rules for net metering for PGE and PacifiCorp customers in July 2007, raising the individual system limit from 25 kilowatts (kW) to two megawatts (MW) for non-residential applications. (The rules do not apply to customers of Idaho

130

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Institutional Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State Arizona Program Type Net Metering Provider Arizona Corporation Commission Net metering is available to customers who generate electricity using solar, wind, hydroelectric, geothermal, biomass, biogas, combined heat and power (CHP) or fuel cell technologies. The ACC has not set a firm kilowatt-based limit on system size capacity; instead, systems must be sized to not exceed 125% of the customer's total connected load. If there is no available load data for the customer, the generating system may not

131

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Energy Sources Solar Home Weatherization Wind Program Info State Wisconsin Program Type Net Metering Provider Public Service Commission of Wisconsin The Public Service Commission of Wisconsin (PSC) issued an order on January 26, 1982 requiring all regulated utilities to file tariffs allowing net metering to customers that generate electricity with systems up to 20 kilowatts (kW)* in capacity. The order applies to investor-owned utilities and municipal utilities, but not to electric cooperatives. All distributed-generation (DG) systems, including renewables and combined heat and power (CHP), are eligible. There is no limit on total enrollment.

132

Station design using orifice meters  

SciTech Connect

This paper reports that proper meter station design using gas orifice meters must include consideration of a number of factors to minimize operation and maintenance problems while obtaining the best accuracy over the life of the station. A station should provide accuracy, be safe, functional, economical and free of undue maintenance. It should comply with all codes, reports and specifications but most of all it should be able to comply with terms set forth in the contract. All measuring stations should be designed with considerations of growth or reductions in volume. It should be attractive and built to last for many years.

Upp, E.L. (Daniel Industries, Inc., Houston, TX (United States))

1992-07-01T23:59:59.000Z

133

Hardware Metering: A Survey Farinaz Koushanfar  

E-Print Network (OSTI)

Chapter 1 Hardware Metering: A Survey Farinaz Koushanfar Abstract This chapter provides the first comprehensive overview of hard- ware integrated circuits (IC) protection by metering. Hardware metering, or IC metering refers to mechanisms, methods, and protocols that enable track- ing of the ICs post

134

meter:alittlelonger kilometer:alittlemore  

E-Print Network (OSTI)

Yard Meter meter:alittlelonger thanayard mile kilometer kilometer:alittlemore thanhalfamile gramM1000000 gigaG1000000000 COMMONPREFIXES 1 8765432 9 161514131211101 8765432 9 16151413121110 cm Yard Meter meter:alittlelonger thanayard mile kilometer kilometer:alittlemore thanhalfamile gram

135

Federal Energy Management Program: Metering Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Process Process to someone by E-mail Share Federal Energy Management Program: Metering Process on Facebook Tweet about Federal Energy Management Program: Metering Process on Twitter Bookmark Federal Energy Management Program: Metering Process on Google Bookmark Federal Energy Management Program: Metering Process on Delicious Rank Federal Energy Management Program: Metering Process on Digg Find More places to share Federal Energy Management Program: Metering Process on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency Data Center Energy Efficiency

136

Alternative Fuels Data Center: Natural Gas Metering  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Natural Gas Metering Natural Gas Metering to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Metering on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Metering on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Metering on Google Bookmark Alternative Fuels Data Center: Natural Gas Metering on Delicious Rank Alternative Fuels Data Center: Natural Gas Metering on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Metering on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Natural Gas Metering Individuals who use natural gas for residential or other tax-free purposes may not use natural gas in motor vehicles unless the natural gas is obtained through a separate meter installed by the alternative fuels

137

Effect of sorghum bran addition on lipid oxidation and sensory properties of ground beef patties differing in fat levels  

E-Print Network (OSTI)

% lean were formulated into three meat blocks containing either 10, 20 or 30% lipid. Within a fat content, ground beef was equally divided into one of six treatments: 1) control-no added ingredients; 2) BHA and BHT at .01% of the meat weight; 3) rosemary...

Hemphill, Susan Patricia

2006-10-30T23:59:59.000Z

138

2,270 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,270 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO 1" NYLON 3/4" SAS EYE INTO EYE SPLICE ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 697.4 METERS 7/16" WIRE ROPE 7.1 METERS 10 METERS 37.1 METERS 75 METERS 100 METERS 125 METERS 225

139

Microsoft Word - CX-BentonCoPUD-FinleySubstationMeterProject_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John Roeder John Roeder Contractor - TEP-CSB-1 Proposed Action: Revenue Meter Replacement at Benton County Public Utility District's (PUD) Finley Substation PP&A Project No: 2594 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an existing JEM1 revenue meter with a new JEMStar revenue meter within an existing meter rack at Benton County PUD's Finley Substation. BPA would own the rack and meter. No ground disturbance or alteration to the meter house would occur. Findings: BPA has determined that the proposed action complies with Section 1021.410 and

140

Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

05 05 Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington U.S. Department of Energy Washington, D.C. March 2002 DOE/EA-1405 U.S. Department of Energy Contents Environmental Assessment C-1 March 2002 CONTENTS PREFACE ....................................................................................................................................P-1 GLOSSARY ................................................................................................................................ G-1 SCIENTIFIC NOTATION CONVERSION CHART .................................................................... G-2 METRIC CONVERSION CHART...............................................................................................

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Nano-to-Meter-Scale Building, a Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-to-Meter-Scale Building, a Summary Nano-to-Meter-Scale Building, a Summary Speaker(s): Danijel Rebolj Date: December 18, 2009 - 12:00pm Location: 90-3122 Development of the core nanotechnologies and synthetic biology is leading to results that are extremely interesting for production of the buildings on the nano level, thus growing buildings on site from the nano into the meter range. Although areas like nanorobotics, programmable materials, and programmable cells are still considered to be speculative to some extent, their fast development encouraged us to start systematic research of new ways for modeling and construction of buildings using bio-nano-technologies. The main motivation, however, was the recognition that, if designed in a sustainable way, the new ways of nano-to-meter-scale

142

2,309 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,309 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO 1" NYLON EYE INTO EYE SPLICE 20 METERS 1 1/8" NYLON 697.4 METERS 7/16" WIRE ROPE 36.1 METERS TC inverted35 METERS 40 METERS 700 METERS 3/4" SAS, Wrench tighten. ** 3/4" SAS WITH BUSHING, Wrench tighten. ** .5

143

Metering Approaches | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approaches Approaches Metering Approaches October 7, 2013 - 9:24am Addthis Metering approaches vary depending on facility design and intended purpose (e.g., administrative offices, laboratory, warehouse, etc.). No one approach fits all applications. In fact, different approaches are often needed at different times. For example, a different approach is needed depending on whether the program is trying to verify utility rates, implement demand response or load management programs, or support certification efforts. One-Time Measurements One-time measurements are useful in many baseline activities to understand instantaneous energy use, equipment performance, or loading. These measurements become particularly useful in trending equipment performance over time. For example, one-time measurements are useful when an energy-efficiency

144

Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Residential Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Wyoming Program Type Net Metering Provider Wyoming Public Service Commission Wyoming enacted legislation in February 2001 that established statewide net metering. The law applies to investor-owned utilities, electric cooperatives and irrigation districts. Eligible technologies include solar, wind, biomass and hydropower systems up to 25 kilowatts (kW) in capacity. Systems must be intended primarily to offset part or all of the customer-generator's requirements for electricity. Net excess generation (NEG) is treated as a kilowatt-hour (kWh) credit or other compensation on the customer's following bill.* When an annual period ends, a utility will purchase unused credits at the utility's avoided-cost

145

Electrical Metering Equipment and Sensors Appendix D -Electrical Metering Equipment and Sensors  

E-Print Network (OSTI)

Appendix D ­ Electrical Metering Equipment and Sensors #12;D.1 Appendix D - Electrical Metering schedules, and view system status from the convenience of a standard web-browser. D.2 Metering Data Logger

146

Federal Building Metering Guidance (Per U.S.C. 8253(e), Metering of Energy Use)  

Energy.gov (U.S. Department of Energy (DOE))

Guidance defines which Federal buildings are appropriate to meter, provides metering prioritization recommendations for agencies with limited resources, and discusses the requirement for agencies to submit metering implementation plans the U.S. Department of Energy.

147

Government Program Briefing: Smart Metering  

Office of Energy Efficiency and Renewable Energy (EERE)

This document is adapted and updated from a memo delivered to the City Council of New Orleans, the office of the Mayor of New Orleans, the Chairperson of the Citizen Stakeholders Group (New Orleans Energy Task Force) and the U.S. Department of Energy (DOE) Project Officer in March 2008. This briefing piece provides an overview of the benefits, costs, and challenges of smart metering.

148

Assessment of compliance with ground water protection standards in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada  

Science Journals Connector (OSTI)

Abstract Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. In support of this development and an associated license application to the U.S. Nuclear Regulatory Commission (NRC), the DOE completed an extensive performance assessment (PA) for the proposed YM repository in 2008. This presentation describes the assessment of compliance with ground water protection standards in the 2008 YM PA. The following topics are addressed: (i) regulatory background, (ii) analysis structure including characterization of uncertainty, and (iii) analysis results for each of the ground water protection standards. The present article is part of a special issue of Reliability Engineering and System Safety devoted to the 2008 YM PA; additional articles in the issue describe other aspects of the 2008 YM PA.

C.W. Hansen; G.A. Behie; K.M. Brooks; Y. Chen; J.C. Helton; S.P. Hommel; K.P. Lee; B. Lester; P.D. Mattie; S. Mehta; S.P. Miller; C.J. Sallaberry; S.D. Sevougian; M. Wasiolek

2014-01-01T23:59:59.000Z

149

Idaho Power - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Idaho Power - Net Metering < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Idaho Program Type Net Metering Provider Idaho Power Company Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has developed a net-metering tariff that has been approved by the Idaho Public Utilities Commission (PUC). The framework of the utilities' net-metering programs is similar, in that each utility: (1) offers net metering to customers that generate electricity using solar, wind, hydropower, biomass or fuel cells; (2) limits residential systems to

150

LADWP - Net Metering (California) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering (California) Net Metering (California) LADWP - Net Metering (California) < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Residential Savings Category Solar Buying & Making Electricity Wind Program Info State California Program Type Net Metering Provider Los Angeles Department of Water and Power LADWP allows its customers to net meter their photovoltaic (PV), wind, and hybrid systems with a capacity of not more than one megawatt. LADWP will provide the necessary metering equipment unless an installation requires atypical metering equipment. In these cases the customer must cover the additional metering expenses. The customer must also pay any related interconnection fees. Excess kilowatt-hours (kWh) generated by the customer's system will be

151

greenMeter | Open Energy Information  

Open Energy Info (EERE)

greenMeter greenMeter Jump to: navigation, search Tool Summary LAUNCH TOOL Name: greenMeter Agency/Company /Organization: Hunter Research & Technology Sector: Energy Focus Area: Energy Efficiency Resource Type: Software/modeling tools User Interface: Mobile Device Website: hunter.pairsite.com/greenmeter/ Web Application Link: hunter.pairsite.com/greenmeter/ Cost: Paid greenMeter Screenshot References: greenMeter[1] Logo: greenMeter greenMeter is an app for the iPhone and iPod Touch that computes your vehicle's power and fuel usage characteristics and evaluates your driving to increase efficiency, reduce fuel consumption and cost, and lower your environmental impact. Results are displayed in real time, while driving, to give instantaneous feedback. Overview Using accelerometer data and the advanced physics engine from the gMeter

152

Avista Utilities - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Avista Utilities - Net Metering Avista Utilities - Net Metering Avista Utilities - Net Metering < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Idaho Program Type Net Metering Provider Avista Utilities Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has developed a net-metering tariff that has been approved by the Idaho Public Utilities Commission (PUC). The framework of the utilities' net-metering programs is similar, in that each utility: (1) offers net metering to customers that generate electricity using solar,

153

NASA's Metering Plan | Department of Energy  

Energy Savers (EERE)

NASA's Metering Plan NASA's Metering Plan Presentation covers NASA's Meterting Plan and is given at the FUPWG 2006 Spring meeting, held on May 3-4, 2006 in Atlanta, Georgia....

154

Metered Mail Form International Mail Only  

E-Print Network (OSTI)

Metered Mail Form International Mail Only Charge to Department USPS First Class Mail International International Metered Mail Form and must be kept separate from all other domestic mail. · International mail

Palmeri, Thomas

155

Heating Energy Meter Validation for Apartments  

E-Print Network (OSTI)

Household heat metering is the core of heating system reform. Because of many subjective and objective factors, household heat metering has not been put into practice to a large extent in China. In this article, the research subjects are second...

Cai, B.; Li, D.; Hao, B.

2006-01-01T23:59:59.000Z

156

Energy Measurement Techniques for Smart Metering  

Science Journals Connector (OSTI)

This chapter discusses topology, architecture and circuit design of energy measurement unit for Smart Metering. The chapter establishes step-by-step design methodology of energy measurement unit of a smart meter ...

Sumit Adhikari

2013-01-01T23:59:59.000Z

157

DOE Releases Federal Building Metering Guidance  

Energy.gov (U.S. Department of Energy (DOE))

The guidance requires federal agencies to review, revise, and submit to FEMP its metering implementation plan within one year.

158

Metering Schemes for General Access Structures  

E-Print Network (OSTI)

Metering Schemes for General Access Structures Barbara Masucci Dipartimento di Informatica ed, Canada E­mail: dstinson@cacr.math.uwaterloo.ca Abstract A metering scheme is a method by which an audit time frame. In this paper we construct metering schemes for more general access structures, which

Stinson, Douglas

159

A PHOTOELECTRIC CURRENT METER Marine Biological Laboratory!  

E-Print Network (OSTI)

330 A PHOTOELECTRIC CURRENT METER Marine Biological Laboratory! WOODS HOLE, MASS. SPECIAL CURRENT METER by H. C. Boyar Fishery Research Biologist Bureau of Commercial Fisheries Biological. March 1960 #12;#12;TABLE OF CONTENTS Page Introduction 1 Description and operation of the meter

160

THE ELECTRICAL RESISTIVITY METER IN FISHERY INVESTIGATIONS  

E-Print Network (OSTI)

THE ELECTRICAL RESISTIVITY METER IN FISHERY INVESTIGATIONS I Marine Biological Laboratory! WOODS RESISTIVITY METER IN FISHERY INVESTIGATIONS By Robert E. Lennon Fishery Research Biologist Appalachian Sport) BiblioKiMpliy : p. ]!. 1. Electric meters. 2. Water--Analysis. 3. Electric fishing. I. Title. ( Series

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Metered Mail Form Domestic Mail Only  

E-Print Network (OSTI)

Metered Mail Form Domestic Mail Only For USPS Mail Only Charge to Department First Class Mail Media Meter Form. · All outgoing USPS Mail that needs postage should be kept separate from all other mail already be sealed prior to being metered. Failure to properly seal this type of mail could result

Palmeri, Thomas

162

Smart Meter Security Infrastructure: Some Observations  

E-Print Network (OSTI)

to infer otherwise-private life-style details of the Smart Meter user. 2 An attacker who can issue on the capa- bility of the device, such an attacker can reset a Smart Meter, cut off electricity supply, access Smart Grid nodes via the Smart Meter, or pretend electricity use that is other than the actual use

Ladkin, Peter B.

163

Melodic cues to meter 1 Running Head: MELODIC CUES TO METER  

E-Print Network (OSTI)

Melodic cues to meter 1 Running Head: MELODIC CUES TO METER The Role of Melodic and Temporal Cues in Perceiving Musical Meter Erin E. Hannon Cornell University Joel S. Snyder Cornell University Tuomas Eerola-569-4326 Tel: 905-828-5415 E-mail: eeh5@cornell.edu #12;Melodic cues to meter 2 Abstract A number of different

Ahmad, Sajjad

164

ANALYSIS OF HIGH PRESSURE TESTS ON WET GAS FLOW METERING WITH A VENTURI METER  

E-Print Network (OSTI)

ANALYSIS OF HIGH PRESSURE TESTS ON WET GAS FLOW METERING WITH A VENTURI METER P. Gajan , Q, 64018 Pau cedex, France pierre.gajan@onera.fr Abstract This work deals with the flow metering of wet gas on the CEESI facilities are presented. They are performed at 75 bars with 0.6 beta ratio Venturi meter

165

PQMII POWER QUALITY METER INSTRUCTION MANUAL 11 PQMII Power Quality Meter  

E-Print Network (OSTI)

#12;#12;#12;PQMII POWER QUALITY METER ­ INSTRUCTION MANUAL 1­1 PQMII Power Quality Meter Chapter 1 Multilin PQMII Power Quality Meter is an ideal choice for continuous monitoring of a single or three-phase system. It provides metering for current, voltage, real power, reactive power, apparent power, energy use

Meyers, Steven D.

166

Ramp meters on trial: Evidence from the Twin Cities metering holiday  

E-Print Network (OSTI)

Ramp meters on trial: Evidence from the Twin Cities metering holiday David Levinson a,*, Lei Zhang; accepted 15 December 2004 Abstract Ramp meters in the Twin Cities have been the subject of a recent test metering for several representative freeways during the afternoon peak period. Seven performance measures

Levinson, David M.

167

2,275 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,275 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METERS NYLON STIFFENER 3/4" SAS .5 M 1/2" CHAIN 3" GLASS BALL FLOATS on 2.5 M Chain ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 5/8" SAS 2 METER CHAIN 697.4 METERS 7/16" WIRE ROPE SONTEK7 METERS 10 METERS 8.3 METERS TV

168

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METERS NYLON STIFFENER 3/4" SAS .5 M 1/2" CHAIN 5 SPLICE 6 ea.17" GLASS BALL FLOATS ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 5/8" SAS 2 METER CHAIN TC INVERTED5 METERS 697.4 METERS WIRE ROPE SONTEK7 METERS 10 METERS 8

169

Kansas - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kansas - Net Metering Kansas - Net Metering Kansas - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kansas Program Type Net Metering Provider Kansas Corporation Commission Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing net metering for customers of investor-owned utilities in Kansas. Net metering applies to systems that generate electricity using solar, wind, methane, biomass or hydro resources, and to fuel cells using hydrogen produced by an eligible

170

Progress Energy - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Progress Energy - Net Metering Progress Energy - Net Metering Progress Energy - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State South Carolina Program Type Net Metering Provider Progress Energy Carolinas In August 2009, the South Carolina Public Service Commission issued an order mandating net metering be made available by the regulated electric utilities; the order incorporates a net metering settlement signed by the individual interveners, the Office of Regulatory Staff and the three investor-owned utilities (IOUs). The order detailed the terms of net metering, including ownership of RECs, in South Carolina and standardized

171

Net Metering Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Webinar Net Metering Webinar Net Metering Webinar June 25, 2014 11:00AM MDT Attendees will become familiar with the services provided by utility net metering and their importance in making projects cost-effective. The speakers will provide information based on case histories of how facilities that generate their own electricity from renewable energy sources can feed electricity they do not use back into the grid. Many states have net-metering laws with which utilities must comply. In states without such legislation, utilities may offer net-metering programs voluntarily or as a result of regulatory decisions. The webinar will cover the general differences between states' legislation and implementation and how the net-metering benefits can vary widely for facilities in different areas of

172

Duke Energy - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duke Energy - Net Metering Duke Energy - Net Metering Duke Energy - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State South Carolina Program Type Net Metering In August 2009, the South Carolina Public Service Commission issued an [http://dms.psc.sc.gov/pdf/matters/F05030FC-E19A-9225-B838F72EDF4557DC.pdf] order mandating net metering be made available by the regulating utilities; the order incorporates a net metering settlement signed by the individual interveners, the Office of Regulatory Staff and the three investor-owned utilities (IOUs). The order detailed the terms of net metering, including

173

EPAct 2005 Metering Guidance Overview | Department of Energy  

Energy Savers (EERE)

EPAct 2005 Metering Guidance Overview EPAct 2005 Metering Guidance Overview Presentation covers an overview of the EPAct 2005 Metering Guidance and is given at the FUPWG 2006...

174

Secretary Chu's Message about Forrestal Electric Metering  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Dear Colleagues, The Department of Energy has a responsibility and an opportunity to lead by example in promoting sustainable energy practices. As many of you have heard me say, energy efficiency is one of our best and most immediate opportunities to save energy, cut utility bills and decrease carbon pollution. I want to thank you for the steps many of you have already taken to reduce energy consumption. Today, I'm asking all employees at the Forrestal Building to take these efforts to the next level by participating in a competition to save money by saving energy. We recently divided the Forrestal complex into five zones and installed electric meters to measure the daily electricity consumption of overhead lights and power outlets in each zone. You've probably seen

175

Substation grounding.  

E-Print Network (OSTI)

??Designing a proper substation grounding system is quite complicating. Many parameters affect its design. In order for a grounding design to be safe, it needs (more)

Baleva, Inna

2012-01-01T23:59:59.000Z

176

Smarter Meters Help Customers Budget Electric Service Costs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tri-State Smart Grid Investment Grant Tri-State Smart Grid Investment Grant 1 Tri-State's service area includes parts of Fannin County, Georgia; Polk County, Tennessee; and Cherokee County, North Carolina. Smarter Meters Help Customers Budget Electric Service Costs Tri-State Electric Membership Cooperative (Tri-State) is a distribution rural electric cooperative that primarily serves more than 12,000 rural customers, many of whom have low-incomes living at or near poverty level across a multi-state region (see map). Under their smart grid project, Tri-State has replaced conventional electromechanical meters with solid-state smart meters and implemented advanced electricity service programs in order to give customers greater control over their energy use and costs.

177

The Need for Essential Consumer Protections: Smart Metering Proposals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Metering Proposals and the Move to Time-Based Pricing The Need for Essential Consumer Protections: Smart Metering Proposals and the Move to Time-Based Pricing There is a widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded to handle not only load growth, but the integration of renewable resources and the potential for a significant increase in electric-powered vehicles. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems, designed to make the grid more reliable and capable of integrating renewable and local-level distribution

178

Widget:GoalMeter | Open Energy Information  

Open Energy Info (EERE)

GoalMeter GoalMeter Jump to: navigation, search This widget produces an image showing progress against some numeric goal. Parameters Parameter Type Required? Example Description goal Integer Y 100 Total goal value http_link String Y groups.google.com/group/openei URL to which the meter will hyperlink. Note that the leading "http://" must be omitted. title String Y Google Group Members The goal's title. value Integer Y 25 Current value of progress against the goal. height Integer N (default=100) 150 Height of the meter image (in pixels). width Integer N (default=200) 300 Width of the meter image (in pixels). Example Output Google Group Members (goal: 100) Retrieved from "http://en.openei.org/w/index.php?title=Widget:GoalMeter&oldid=271157"

179

Guam - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guam - Net Metering Guam - Net Metering Guam - Net Metering < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Wind Solar Home Weatherization Program Info Program Type Net Metering Provider Guam Energy Office Guam's Public Utilities Commission (PUC) reviewed net metering and interconnection during a regular meeting in February 2009 (Docket 08-10). Please contact the [http://www.guampuc.com/ Guam PUC] for the results of that docket review. In 2004, Guam enacted legislation requiring the Guam Power Authority (GPA) to allow net metering for customers with fuel cells, microturbines, wind energy, biomass, hydroelectric, solar energy or hybrid systems of these

180

Net Metering Rules (Arkansas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Rules (Arkansas) Net Metering Rules (Arkansas) Net Metering Rules (Arkansas) < Back Eligibility Commercial Industrial Installer/Contractor Investor-Owned Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Arkansas Program Type Net Metering Provider Arkansas Public Service Commission The Net Metering Rules are promulgated under the authority of the Arkansas Public Service Commission. These rules are created to establish rules for net energy metering and interconnection. These rules are developed pursuant to the Arkansas Renewable Energy Development Act (Arkansas Code Annotated 23-18-603). These rules apply to all electric utilities.

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

A Million Meter Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Million Meter Milestone A Million Meter Milestone A Million Meter Milestone March 4, 2011 - 2:36pm Addthis To see what installing the 1 millionth meter looked like, check out this video. Don Macdonald Program Manager, Smart Grid Investment Grant Program What does this mean for me? Smart meters allow consumers to take personal control and ownership of her energy usage in a way not possible before. As program manager for the Department of Energy's Recovery Act funded Smart Grid Investment Grant (SGIG) program, I've had the pleasure of seeing SGIG reach several important milestones recently. Among the most notable has been the recent achievement of three million smart meters installed by SGIG recipients as of December 31, 2010. On February 23, 2011, along with my colleague Chris Irwin, I was in Houston, Texas where SGIG

182

SRP - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRP - Net Metering SRP - Net Metering SRP - Net Metering < Back Eligibility Commercial Residential Savings Category Buying & Making Electricity Solar Wind Program Info State Arizona Program Type Net Metering Provider SRP Salt River Project (SRP) modified an existing net-metering program for residential and commercial customers in November 2013. Net metering is now available to customers who generate electricity using photovoltaic (PV), geothermal, or wind systems up to 300 kilowatts (kW) in AC peak capacity. The kilowatt-hours (kWh) delivered to SRP are subtracted from the kWh delivered from SRP for each billing cycle. If the kWh calculation is net positive for the billing cycle, SRP will bill the net kWh to the customer under the applicable price plan, Standard Price Plan E-21, E-23, E-26,

183

Nonclassical dynamics induced by a quantum meter  

Science Journals Connector (OSTI)

Conventionally, the effect of measurements on a quantum system is assumed to introduce decoherence, which renders the system classical-like. We consider here a microscopic meter, that is, an auxiliary essentially quantum system whose state is measured repeatedly, and show that it can be employed to induce transitions from classical states into inherently quantumlike states. The meter state is assumed to be lost in the environment and we derive a non-Markovian master equation for the dynamic system in the case of nondemolition coupling to the meter; this equation can be cast in the form of an (Na)th-order differential equation in time, where Na is the dimension of the meter basis. We apply the approach to a harmonic oscillator coupled to a spin-12 meter and demonstrate how it can be used to engineer effective Hamiltonian evolution, subject to decoherence induced by the projective meter measurements.

J. Clausen; J. Salo; V. M. Akulin; S. Stenholm

2005-12-05T23:59:59.000Z

184

Estimation of natural ground water recharge for the performance assessment of a low-level waste disposal facility at the Hanford Site  

SciTech Connect

In 1994, the Pacific Northwest Laboratory (PNL) initiated the Recharge Task, under the PNL Vitrification Technology Development (PVTD) project, to assist Westinghouse Hanford Company (WHC) in designing and assessing the performance of a low-level waste (LLW) disposal facility for the US Department of Energy (DOE). The Recharge Task was established to address the issue of ground water recharge in and around the LLW facility and throughout the Hanford Site as it affects the unconfined aquifer under the facility. The objectives of this report are to summarize the current knowledge of natural ground water recharge at the Hanford Site and to outline the work that must be completed in order to provide defensible estimates of recharge for use in the performance assessment of this LLW disposal facility. Recharge studies at the Hanford Site indicate that recharge rates are highly variable, ranging from nearly zero to greater than 100 mm/yr depending on precipitation, vegetative cover, and soil types. Coarse-textured soils without plants yielded the greatest recharge. Finer-textured soils, with or without plants, yielded the least. Lysimeters provided accurate, short-term measurements of recharge as well as water-balance data for the soil-atmosphere interface and root zone. Tracers provided estimates of longer-term average recharge rates in undisturbed settings. Numerical models demonstrated the sensitivity of recharge rates to different processes and forecast recharge rates for different conditions. All of these tools (lysimetry, tracers, and numerical models) are considered vital to the development of defensible estimates of natural ground water recharge rates for the performance assessment of a LLW disposal facility at the Hanford Site.

Rockhold, M.L.; Fayer, M.J.; Kincaid, C.T.; Gee, G.W.

1995-03-01T23:59:59.000Z

185

Evaluation of the fatty acid composition and caloric value of ground beef formulated to contain low levels of fat  

E-Print Network (OSTI)

. 02e . 09 p3d e pgcd 1 gde . 02e . 27d psde 27d . 02e Total fatly acids 4. 57gh 5 45ef 6 opde 6 60d 7 61c 4 42h 4 91lgh 4 84fgh 5 1 sfg 5 61e 5 g8de a Cooked to one level of doneness. b Mean values of two chemical analyses per sample. F...Nic Palmitoleic Stearic . 79c . 33d 5 23c 1 46c 3 26c 10. 20 37h 2 90h . 879k 5. 35' 80c . 43c 5 23c 1 37c 2. 574 9. 254 44g h . 1919 3 30gh . 919 44lgh . 1919 3 20gh . 97'9 2. 00s 9 1. 969 6 69fgh 6 43lgh . 55def 24 sf g 3 80ef...

Campbell, Laura Elaine

2012-06-07T23:59:59.000Z

186

O&M Metering Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O&M and Metering Guidance O&M and Metering Guidance Ab Ream Ab.ream@ee.doe.gov Federal Utility Partnership Working Group October 2010, Rapid City SD 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov O&M and Metering Guidance FEMP Mission Statement "The Federal Energy Management Program facilitates the Federal government's implementation of sound, cost- effective energy management practices to enhance the nation's energy security and environmental stewardship" 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov O&M and Metering Guidance O&M Best Practice Guidance Release 3.0 - August 2010 General Updates Include:

187

Ellsworth Air Force Base Advanced Metering Project  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the Ellsworth Air Force Base Advanced Metering project and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

188

Advanced Metering Infrastructure Security Considerations | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrastructure Security Considerations The purpose of this report is to provide utilities implementing Advanced Metering Infrastructure (AMI) with the knowledge necessary to...

189

Assessment of Demand Response and Advanced Metering  

E-Print Network (OSTI)

#12;#12;2008 Assessment of Demand Response and Advanced Metering Staff Report Federal Energy metering penetration and potential peak load reduction from demand response have increased since 2006. Significant activity to promote demand response or to remove barriers to demand response occurred at the state

Tesfatsion, Leigh

190

Proton recoil scintillator neutron rem meter  

DOE Patents (OSTI)

A neutron rem meter utilizing proton recoil and thermal neutron scintillators to provide neutron detection and dose measurement. In using both fast scintillators and a thermal neutron scintillator the meter provides a wide range of sensitivity, uniform directional response, and uniform dose response. The scintillators output light to a photomultiplier tube that produces an electrical signal to an external neutron counter.

Olsher, Richard H. (Los Alamos, NM); Seagraves, David T. (Los Alamos, NM)

2003-01-01T23:59:59.000Z

191

Energy savings attributable to switching from master metering to individual metering of electricity  

SciTech Connect

This technical memo reviews and analyzes the published literature on electricity consumption by tenants in residential buildings with individual meters, compared with electricity consumption in residential buildings with master meters. An important finding is that energy savings of individual over master metering are strongly correlated with the price of electricity.

Nelson, S.H.

1981-01-01T23:59:59.000Z

192

Puerto Rico - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Puerto Rico - Net Metering Puerto Rico - Net Metering Puerto Rico - Net Metering < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Energy Sources Buying & Making Electricity Solar Wind Program Info Program Type Net Metering Provider Autoridad de Energía Electrica de Puerto Rico Puerto Rico enacted net-metering legislation in August 2007, allowing customers of Puerto Rico Electric Power Authority (PREPA) to use electricity generated by solar, wind or "other" renewable-energy resources to offset their electricity usage. This law applies to residential systems with a generating capacity of up to 25 kilowatts (kW) and non-residential systems up to one megawatt (MW) in capacity.*

193

Definition: Meter Communications Network | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Meter Communications Network Jump to: navigation, search Dictionary.png Meter Communications Network The communications infrastructure that supports two-way delivery of information between smart meters and data collectors or access points. This infrastructure can be wired or wireless, and can be owned by the utility or a third party service provider. This network is sometimes referred to as a "field area network".[1] Related Terms smart grid References ↑ https://www.smartgrid.gov/category/technology/meter_communications_network [[C Like Like You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitions|Template:BASEPAGENAME]] Retrieved from "http://en.openei.org/w/index.php?title=Definition:Meter_Communications_Network&oldid=493063"

194

Ground Water Ground Sky Sky Water Vegetation Ground Vegetation Water  

E-Print Network (OSTI)

Bear Snow Vegetation RhinoWater Vegetation Ground Water Ground Sky Sky Rhino Water Vegetation Ground Vegetation Water Rhino Water Vegetation Ground Rhino Water Rhino Water Ground Ground Vegetation Water Rhino Vegetation Rhino Vegetation Ground Rhino Vegetation Ground Sky Rhino Vegetation Ground Sky

Chen, Tsuhan

195

Algorithms for revenue metering and their evaluation  

E-Print Network (OSTI)

systems, which include, among other functions, the remote measurement systems. The new generation of meters is capable of calculating almost any definition for the power components. The problem now is which definitions are going to be implemented...

Martinez-Lagunes, Rodrigo

2012-06-07T23:59:59.000Z

196

June 25 Webinar to Explore Net Metering  

Energy.gov (U.S. Department of Energy (DOE))

Register for the Net Metering webinar, which will be held on Wednesday, June 25, 2014, from 11 a.m. to 12:30 p.m. Mountain time.

197

Demand Response and Smart Metering Policy Actions Since the Energy Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Smart Metering Policy Actions Since the Energy and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials This report represents a review of policy developments on demand response and other related areas such as smart meters and smart grid. It has been prepared by the Demand Response Coordinating Committ ee (DRCC) for the National Council on Electricity Policy (NCEP). The report focuses on State and Federal policy developments during the period from 2005 to mid-year 2008. It is an att empt to catalogue information on policy developments at both the federal and state level, both in the legislative and regulatory arenas. Demand Response and Smart Metering Policy Actions Since the Energy Policy

198

Portable Liquid Flow Metering for Energy Conservation Programs  

E-Print Network (OSTI)

meters to measure liquids. This paper reviews the principles of ultrasonic flow meters. Applications and costs of ultrasonic versus orifice flow meters are important to consider in energy audits. A discussion follows on 'how' and 'where' to use...

Miles, F. J.

1982-01-01T23:59:59.000Z

199

Working With Your Utility to Obtain Metering Services  

Energy.gov (U.S. Department of Energy (DOE))

Presentationgiven at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meetingcovers the government metering requirement, the U.S. Department of Defense (DoD) metering directive, and customer metering services available from utilities.

200

You Can Justify Meters for Your Energy Conservation Program  

E-Print Network (OSTI)

Meters don't save energy' This statement has often concluded a meeting or terminated a budget request leaving the metering proponent feeling frustrated. Such a statement is technically correct when meters are evaluated in the same way as equipment...

Rusnak, J. J.

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Use Meters to Put Teeth into Your Conservation Programs  

E-Print Network (OSTI)

is effective flow metering, but that is a difficult job even in more traditional applications. The problem is compounded by the fact that traditional metering concepts are inadequate for the unique problems presented by retro-metering for in...

Hayes, J. W.; Rusnak, J. J.

1980-01-01T23:59:59.000Z

202

Quantum noise of non-ideal Sagnac speed meter interferometer with asymmetries  

E-Print Network (OSTI)

The speed meter concept has been identified as a technique that can potentially provide laser-interferometric measurements at a sensitivity level which surpasses the Standard Quantum Limit (SQL) over a broad frequency range. As with other sub-SQL measurement techniques, losses play a central role in speed meter interferometers and they ultimately determine the quantum noise limited sensitivity that can be achieved. So far in the literature, the quantum noise limited sensitivity has only been derived for lossless or lossy cases using certain approximations (for instance that the arm cavity round trip loss is small compared to the arm cavity mirror transmission). In this article we present a generalised, analytical treatment of losses in speed meters that allows accurate calculation of the quantum noise limited sensitivity of Sagnac speed meters with arm cavities. In addition, our analysis allows us to take into account potential imperfections in the interferometer such as an asymmetric beam splitter or differences of the reflectivities of the two arm cavity input mirrors. Finally,we use the examples of the proof-of-concept Sagnac speed meter currently under construction in Glasgow and a potential implementation of a Sagnac speed meter in the Einstein Telescope (ET) to illustrate how our findings affect Sagnac speed meters with meter- and kilometre-long baselines.

S. L. Danilishin; C. Graef; S. S. Leavey; J. Hennig; E. A. Houston; D. Pascucci; S. Steinlechner; J. Wright; S. Hild

2014-12-02T23:59:59.000Z

203

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METERS NYLON STIFFENER 3/4" SAS .5 M 1/2" CHAIN 5 SPLICE 17" GLASS BALL FLOATS 5/8" SAS 5/8" SAS 3 TON SWIVEL ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 5/8" SAS 2 METER CHAIN .5 METER CHAIN 3/4" SAS WITH BUSHING TC

204

Metering Best Practices: A Guide to Achieving Utility Resource Efficiency  

Energy.gov (U.S. Department of Energy (DOE))

Guide describes information about energy and resource metering at federal facilities, including metering requirements under the Energy Policy Act of 2005.

205

Demand Response and Smart Metering Policy Actions Since the Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the...

206

Fuel Quality and Metering: Current Status and Future Needs |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Quality and Metering: Current Status and Future Needs Fuel Quality and Metering: Current Status and Future Needs These slides were presented at the Onboard Storage Tank...

207

,,,,,"Capacity MW",,,,,"Number of Meters",,,,,"Energy Sold Back...  

U.S. Energy Information Administration (EIA) Indexed Site

Other",,,"All Technologies" ,,,,,"Capacity MW",,,,,"Number of Meters",,,,,"Energy Sold Back MWh",,,,,"Capacity MW",,,,,"Number of Meters",,,,,"Energy Sold Back...

208

Meter-baseline tests of sterile neutrinos at Daya Bay  

E-Print Network (OSTI)

We explore the sensitivity of an experiment at the Daya Bay site, with a point radioactive source and a few meter baseline, to neutrino oscillations involving one or more eV mass sterile neutrinos. We find that within a year, the entire 3+2 and 1+3+1 parameter space preferred by global fits can be excluded at the 3\\sigma level, and if an oscillation signal is found, the 3+1 and 3+2 scenarios can be distinguished from each other at more than the 3\\sigma level provided one of the sterile neutrinos is lighter than 0.5 eV.

Y. Gao; D. Marfatia

2013-05-07T23:59:59.000Z

209

Lefvre M., Cros S., Albuisson M., Wald L., 2003. Developing a database using Meteosat data for the de-livery of solar radiation assessments at ground level. In Proceedings of the 23rd EARSeL Annual Symposium  

E-Print Network (OSTI)

, oceanogra- phy and limnology applications, urban air quality studies, sizing of space borne sensors, solar for the de- livery of solar radiation assessments at ground level. In Proceedings of the 23rd EARSeL Annual, Rotterdam, Netherlands, pp. 485-489. Developing a database using METEOSAT data for the delivery of solar

Paris-Sud XI, Université de

210

An Angstrom-long Meter Stick  

NLE Websites -- All DOE Office Websites (Extended Search)

Physical Review Focus Physical Review Focus An Angstrom-long Meter Stick When you want to measure the width of a window frame or the height of your growing child, it helps to have a good meter stick. But on the atomic scale, accurate measurements are harder to come by. In the 17 July PRL, a team reports a potential new standard of length for short distances based on radiation from the excited nuclei of iron atoms. Further improvements may make this standard an important tool for probing the structure of matter, where physicists must gauge the separations between nuclei with an accuracy of millionths of an angstrom. Figure by Robert Irion depicting Mossbauer effect. by Robert Irion The meter, once defined as the gap between two etchings on a metal bar in Paris, is now set as the distance that light from a helium-neon laser

211

Metering and Monitoring Approaches for Verifying Energy Savings from Energy Conservation Retrofits: Experiences from the Field  

E-Print Network (OSTI)

METERING AND MONITORING APPROACHES FOR VERIFYING ENERGY SAVINGS FROM ENERGY CONSERVATION RETROFITS: EXPERIENCES FROM THE FIELD John R. McBride Charles J. Bohmer Roger H. Lippman Senior Scientist Senior Instrumentation Senior Instrumentation... drying process that operates at a constant energy level on a constant schedule are examples of this class of load. Engineering calculations without in-field metering and monitoring may be sufficient for this project class. Next in complexity...

McBride, J. R.; Bohmer, C. J.; Lippman, R. H.

212

Liquid metal Flow Meter - Final Report  

SciTech Connect

Measuring the flow of liquid metal presents serious challenges. Current commercially-available flow meters use ultrasonic, electromagnetic, and other technologies to measure flow, but are inadequate for liquid metal flow measurement because of the high temperatures required by most liquid metals. As a result of the reactivity and high temperatures of most liquid metals, corrosion and leakage become very serious safety concerns. The purpose of this project is to develop a flow meter for Lockheed Martin that measures the flow rate of molten metal in a conduit.

Andersen C, Hoogendoom S, Hudson B, Prince J, Teichert K, Wood J, Chase K

2007-01-30T23:59:59.000Z

213

INSTRUCTION MANUAL digital pH/mV meter  

E-Print Network (OSTI)

INSTRUCTION MANUAL model 701A digital pH/mV meter /r^ ORION RESEARCH #12;contents Introduction 1 701A digital pH/mV meter is the ideal meter for all research and precision measurements with pH and chemical sensing electrodes. In both the absolute and relative mV modes, the meter covers a range of ± 1999

Kleinfeld, David

214

Microsoft Word - CX-TaylorFlatsSubstationMeterFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2013 25, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Bob Trisman Electrical Engineer - TEP-CSB-1 Proposed Action: Revenue meter replacement at Franklin County Public Utility District's (PUD) Taylor Flats Substation PP&A Project No: 2608 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Franklin County, Washington. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to remove the existing equipment and replace it with a new JEMSTAR revenue meter within BPA's existing meter rack inside Franklin County PUD's Taylor Flats Substation. No ground disturbance or alteration to the control house would occur.

215

Laser Power Meter Large, bright, backlit LCD  

E-Print Network (OSTI)

Laser Power Meter FEATURES · Large, bright, backlit LCD display · Digital accuracy with analog-like movement for laser tuning · Works with thermopile and optical sensors · Intuitive button-driven user COMPATIBILITY · PowerMax® thermal sensors · Optical sensors FieldMaxII-TO Coherent Laser Measurement and Control

Woodall, Jerry M.

216

Monitoring Advanced Metering Infrastructures with Amilyzer  

E-Print Network (OSTI)

-way communications between smart meters and utility control centers. They are a key component of the smart grid mechanisms are part of communication standards such as the ANSI #12;C12.22. While those protective measures detecting intrusions in IT environments have been developed and evaluated. Through the Trustworthy Cyber

Sanders, William H.

217

KVP meter errors induced by plastic wrap  

SciTech Connect

The purpose of this study was to determine whether erroneous kVp meter readings, induced by plastic wrap, affected the actual kVp (output) of a dental X-ray machine. To evaluate the effect of plastic wrap on dental X-ray machine kVp meters, a radiation output device was used to measure output in mR/ma.s. An intraoral dental X-ray unit (S.S. White Model {number sign}90W) was used to make the exposures. First, the kVp meter was not covered with plastic wrap and output readings were recorded at various kVp settings with the milliamperage and time held constant. Secondly, the same kVp settings were selected before the plastic wrap was placed. Milliamperage and time were again held to the same constant. The X-ray console was then covered with plastic wrap prior to measuring the output for each kVp. The wrap possessed a static charge. This charge induced erroneous kVp meter readings. Out-put readings at the various induced kVp settings were then recorded. A kVp of 50 with no wrap present resulted in the same output as a kVp of 50 induced to read 40 or 60 kVp by the presence of wrap. Similar results were obtained at other kVp settings. This indicates that the plastic wrap influences only the kVp meter needle and not the actual kilovoltage of the X-ray machine. Dental X-ray machine operators should select kVp meter readings prior to placing plastic wrap and should not adjust initial settings if the meter is deflected later by the presence of wrap. The use of such a procedure will result in proper exposures, fewer retakes, and less patient radiation. If plastic wrap leads to consistent exposure errors, clinicians may wish to use a 0.5% sodium hypochlorite disinfectant as an alternative to the barrier technique.

Jefferies, D.; Morris, J.W.; White, V.P. (Southern Illinois Univ., Carbondale (USA))

1991-02-01T23:59:59.000Z

218

Development of 2-Meter Soil Temperature Probes and Results of Temperature  

Open Energy Info (EERE)

Development of 2-Meter Soil Temperature Probes and Results of Temperature Development of 2-Meter Soil Temperature Probes and Results of Temperature Survey Conducted at Desert Peak, Nevada, USA Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Development of 2-Meter Soil Temperature Probes and Results of Temperature Survey Conducted at Desert Peak, Nevada, USA Abstract Temperature gradient drilling has historically been a key tool in the exploration for geothermal resources in the Great Basin, USA but regulatory, environmental, and accessibility issues, as well as the expense of drilling, are increasingly limiting its use. In cases where thermal groundwater is not overlain by near-surface cold aquifers, temperatures measured at a depth of 2-meters is an efficient method for mapping thermal anomalies at a high level of detail. This is useful for augmenting deeper

219

Upgrading of Traditional Electric Meter into Wireless Electric Meter Using ZigBee Technology  

Science Journals Connector (OSTI)

Since the electric generating, distributing and marketing has been possible; the Electric Meter was introduced and developed along the years, but never like this time. The digital technology, the wireless comm...

Berhanu Regassa; Ana Vernica Medina; Isabel M. Gmez; Octavio Rivera

2012-01-01T23:59:59.000Z

220

2010 Assessment of Demand Response and Advanced Metering - Staff Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Demand Response and Advanced Metering - Staff Assessment of Demand Response and Advanced Metering - Staff Report 2010 Assessment of Demand Response and Advanced Metering - Staff Report 2010 Assessment of Demand Response and Advanced Metering - Staff Report. The Federal Energy Regulatory Commission's 2010 Demand Response and Advanced Metering Survey (2010 FERC Survey, covering calendar year 2009) indicates that advanced metering penetration (i.e., the fraction of all installed meters that are advanced meters) reached approximately 8.7 percent in the United States, compared to approximately 4.7 percent in the 2008 FERC Survey (covering calendar year 2007). The upper Midwest, West and Texas have advanced meter penetrations exceeding 13 percent. As in previous surveys, electric cooperatives have the largest penetration, nearly 25 percent, among

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

2010 Assessment of Demand Response and Advanced Metering - Staff Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 Assessment of Demand Response and Advanced Metering - Staff 2010 Assessment of Demand Response and Advanced Metering - Staff Report 2010 Assessment of Demand Response and Advanced Metering - Staff Report 2010 Assessment of Demand Response and Advanced Metering - Staff Report. The Federal Energy Regulatory Commission's 2010 Demand Response and Advanced Metering Survey (2010 FERC Survey, covering calendar year 2009) indicates that advanced metering penetration (i.e., the fraction of all installed meters that are advanced meters) reached approximately 8.7 percent in the United States, compared to approximately 4.7 percent in the 2008 FERC Survey (covering calendar year 2007). The upper Midwest, West and Texas have advanced meter penetrations exceeding 13 percent. As in previous surveys, electric cooperatives have the largest penetration, nearly 25 percent, among

222

Ellsworth Air Force Base Advanced Metering Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ellsworth Air Force Base Ellsworth Air Force Base Advanced Metering Project A Partnership between Ellsworth AFB and MDU Resources Group, Inc. to install advanced metering on all large buildings on EAFB  Based in Bismarck, North Dakota  Celebrated our 85 th year in 2009  NYSE - MDU for over 60 years  Over $4B market cap  Fortune 500 Company  Member of the S&P MidCap 400 Index  Over 8,000 employees in 44 states  Business Lines:  Energy  Utility Resources  Construction Materials  Construction Materials  Energy  Oil and Gas Production  Utility Resources  Natural Gas Pipelines  Construction Services  Electric / Natural Gas Utilities  Utility Resources  Montana - Dakota Utilities Co.  Cascade Natural Gas Co.  Intermountain Gas Corporation

223

Resonant speed meter for gravitational wave detection  

E-Print Network (OSTI)

Gravitational-wave detectors have been well developed and operated with high sensitivity. However, they still suffer from mirror displacement noise. In this paper, we propose a resonant speed meter, as a displacement noise-canceled configuration based on a ring-shaped synchronous recycling interferometer. The remarkable feature of this interferometer is that, at certain frequencies, gravitational-wave signals are amplified, while displacement noises are not.

Atsushi Nishizawa; Seiji Kawamura; Masa-aki Sakagami

2008-05-01T23:59:59.000Z

224

Nevada Smart Meter Program Launches | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada Smart Meter Program Launches Nevada Smart Meter Program Launches Nevada Smart Meter Program Launches October 18, 2010 - 11:30am Addthis Workers began installing smart meters for NV Energy's smart meter project three weeks ago. The project is expected to create 200 jobs, according to NV Energy. | Photo courtesy of NV Energy Workers began installing smart meters for NV Energy's smart meter project three weeks ago. The project is expected to create 200 jobs, according to NV Energy. | Photo courtesy of NV Energy Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy What does this mean for me? These meters will not only allow residents to lower their energy bills by providing them information on their energy use, but by reducing operating costs, the utility expects to pass on these savings as well.

225

City of St. George - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of St. George - Net Metering City of St. George - Net Metering City of St. George - Net Metering < Back Eligibility Commercial General Public/Consumer Residential Savings Category Solar Buying & Making Electricity Program Info State Utah Program Type Net Metering Provider City of St. George The St. George City Council adopted a [http://www.sgcity.org/wp/power/NetMeteringPolicy.pdf net-metering program for area utilities], including interconnection procedures, in October 2005.* The interconnection procedures include different requirements, based on system size, for systems up to 10 megawatts (MW). Net metering is available to residential and commercial customers that generate electricity using photovoltaic (PV) systems. The net metering agreements currently available on the utility's web site only pertain to

226

Two-Meter Temperature Surveys for Geothermal Exploration Project...  

Open Energy Info (EERE)

Two-Meter Temperature Surveys for Geothermal Exploration Project at NAS Fallon Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Two-Meter...

227

WINDExchange: Offshore 90-Meter Wind Maps and Wind Resource Potential  

Wind Powering America (EERE)

Offshore 90-Meter Wind Maps and Wind Resource Potential The U.S. Department of Energy provides 90-meter (m) height, high-resolution wind maps and estimates of the total offshore...

228

WINDExchange: Community-Scale 50-Meter Wind Maps  

Wind Powering America (EERE)

Community-Scale 50-Meter Wind Maps The U.S. Department of Energy provides 50-meter (m) height, high-resolution wind resource maps for most of the states and territories of Puerto...

229

WINDExchange: Residential-Scale 30-Meter Wind Maps  

Wind Powering America (EERE)

Residential-Scale 30-Meter Wind Maps The U.S. Department of Energy provides 30-meter (m) height, high-resolution wind resource maps for the United States. Businesses, farms, and...

230

SmartD: smart meter data analytics dashboard  

Science Journals Connector (OSTI)

The ability of smart meters to communicate energy consumption data in (near) real-time enables data analytics for novel applications, such as pervasive demand response, personalized energy feedback, outage management, and theft detection. Smart meter ... Keywords: energy consumption analysis, smart meters, visualization

Aylin Jarrah Nezhad, Tri Kurniawan Wijaya, Matteo Vasirani, Karl Aberer

2014-06-01T23:59:59.000Z

231

RIS-M-2254 ON A RADIOCHROMIC DYE DOSE METER  

E-Print Network (OSTI)

RIS?-M-2254 ON A RADIOCHROMIC DYE DOSE METER Arne Miller and William L. McLaughlin Abstract. Radiochromic dye dose meters made of polyvinyl butyral (PVB) with hexa(hydroxyethyl)pararosaniline cyanide (HPR results and outlines plans for further research on this dose meter. Currently the response is found

232

ONE GEV BEAM ACCELERATION IN A ONE METER LONG  

E-Print Network (OSTI)

ONE GEV BEAM ACCELERATION IN A ONE METER LONG PLASMA CELL A Proposal to the Stanford Linear. A single SLC bunch is used to both induce wakefields in the one meter long plasma and to witness that are needed to apply high-gradient plasma wakefield acceleration to large scale accelerators. The one meter

233

Model 1918-C Hand-held Optical Meter  

E-Print Network (OSTI)

Model 1918-C Hand-held Optical Meter Start Up Guide #12;Start Up Guide 1 First printing 2006 © 2006, including safety precautions and start up procedures, needed to get your new optical meter up and running the use and operation of the optical meter is included in the complete User's Manual. The complete User

Kleinfeld, David

234

Math for Poets and Drummers The Mathematics of Meter  

E-Print Network (OSTI)

Math for Poets and Drummers The Mathematics of Meter Rachel Hall Saint Joseph's University 5600 a number of problems that are explored in class. In English and Spanish, the rhythm, or meter, of a piece- speare are written in the meter called iambic pentameter: five pairs of alternating unstressed

Hall, Rachel W.

235

Arnold Schwarzenegger TIME-OF-USE WATER METER EFFECTS  

E-Print Network (OSTI)

Arnold Schwarzenegger Governor TIME-OF-USE WATER METER EFFECTS ON CUSTOMER WATER USE; Master Meter Ed Amelung; Southern California Edison Company ­ Matt Garcia, Curtis DeWoody, and James · Transportation TimeofUse Water Meter Impacts on Customer Water Use is the final report for the project 500 07022

236

Weak measurements with a qubit meter  

E-Print Network (OSTI)

We derive schemes to measure the so-called weak values of quantum system observables by coupling of the system to a qubit meter system. We highlight, in particular, the meaning of the imaginary part of the weak values, and show how it can be measured directly on equal footing with the real part of the weak value. We present compact expressions for the weak value of single qubit observables and of product observables on qubit pairs. Experimental studies of the results are suggested with cold trapped ions.

Shengjun Wu; Klaus Mlmer

2009-11-13T23:59:59.000Z

237

Long Island Power Authority - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Long Island Power Authority - Net Metering < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Solar Program Info State New York Program Type Net Metering Provider Long Island Power Authority : Note: In October 2012 the LIPA Board of Trustees adopted changes to the utility's net metering tariff that permit remote net metering for non-residential solar and wind energy systems, and farm-based biogas and wind energy systems. It also adopted a measure to increase the aggregate net metering cap for solar, agricultural biogas, residential micro-CHP and

238

Rocky Mountain Power - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Power - Net Metering Rocky Mountain Power - Net Metering Rocky Mountain Power - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Idaho Program Type Net Metering Provider Rocky Mountain Power Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has a net-metering tariff on file with the Idaho Public Utilities Commission (PUC). The framework of the utilities' net-metering programs is similar, in that each utility: (1) offers net

239

Austin Energy - Net Metering (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin Energy - Net Metering (Texas) Austin Energy - Net Metering (Texas) Austin Energy - Net Metering (Texas) < Back Eligibility Commercial Savings Category Bioenergy Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Texas Program Type Net Metering Provider Austin Energy Austin Energy, the municipal utility of Austin Texas, offers net metering for renewable energy systems up to 20 kilowatts (kW) to its non-residential retail electricity customers. The definition of renewable includes solar*, wind, geothermal, hydroelectric, wave and tidal energy, biomass, and biomass-based waste products, including landfill gas. Systems must be used primarily to offset a portion or all of a customer's on-site electric load. Metering is accomplished using a single meter capable of registering the

240

Montana Electric Cooperatives - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Cooperatives - Net Metering Electric Cooperatives - Net Metering Montana Electric Cooperatives - Net Metering < Back Eligibility Commercial Residential Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Montana Program Type Net Metering Provider Montana Electric Cooperatives' Association The Montana Electric Cooperatives' Association (MECA) adopted model interconnection guidelines in 2001 and a revised net-metering policy in September 2008. Net metering is available in whole or part by most of the 26 electric cooperatives in Montana. A map of the service areas of each of member cooperative is available on the MECA web site. To determine if a specific cooperative offers net metering, view the MECA

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Definition: Meter Data Management System | Open Energy Information  

Open Energy Info (EERE)

System System Jump to: navigation, search Dictionary.png Meter Data Management System A meter data management system (MDMS) collects and stores meter data from a head-end system and processes that meter data into information that can be used by other utility applications including billing, customer information systems, and outage management systems. The MDMS is a key resource for managing large quantities of meter data.[1] Related Terms system, outage management system References ↑ https://www.smartgrid.gov/category/technology/meter_data_management_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Meter_Data_Management_System&oldid=50258

242

Washington City Power - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington City Power - Net Metering Washington City Power - Net Metering Washington City Power - Net Metering < Back Eligibility General Public/Consumer Savings Category Solar Buying & Making Electricity Wind Program Info State Utah Program Type Net Metering Provider Washington City Washington City adopted a net-metering program, including interconnection procedures, in January 2008.* Net metering is available to residential and commercial customers that generate electricity using photovoltaic (PV) systems or wind-energy systems up to 10 kilowatts (kW) in capacity. At the customer's expense, the municipal utility will provide a single, bidirectional meter to measure the in-flow and out-flow of electricity at the customer's home. Systems are restricted to being sized to provide no more than 120% of the historic maximum monthly energy consumption of the

243

Farmington Electric Utility System - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Farmington Electric Utility System - Net Metering Farmington Electric Utility System - Net Metering Farmington Electric Utility System - Net Metering < Back Eligibility Residential Savings Category Energy Sources Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State New Mexico Program Type Net Metering Provider Farmington Electric Utility System Net metering rules developed by the New Mexico Public Regulation Commission (PRC) apply to the state's investor-owned utilities and electric cooperatives. Municipal utilities, which are not regulated by the commission, are exempt from the PRC rules but authorized to develop their own net metering programs. Farmington Electric, a municipal utility, offers net metering to residential customers with systems up to 10 kilowatts (kW) in capacity.

244

Smart Metering Pilot Program Inc SMPPI | Open Energy Information  

Open Energy Info (EERE)

Metering Pilot Program Inc SMPPI Metering Pilot Program Inc SMPPI Jump to: navigation, search Name Smart Metering Pilot Program, Inc. (SMPPI) Place Washington, DC Product SMPPI is a non-profit corporation composed of representatives of Pepco, the D.C. Public Service Commission, the D.C. Office of People's Counsel, the D.C. Consumer Utility Board, and the International Brotherhood of Electrical Workers Local 1900. References Smart Metering Pilot Program, Inc. (SMPPI)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Smart Metering Pilot Program, Inc. (SMPPI) is a company located in Washington, DC . References ↑ "Smart Metering Pilot Program, Inc. (SMPPI)" Retrieved from "http://en.openei.org/w/index.php?title=Smart_Metering_Pilot_Program_Inc_SMPPI&oldid=351192"

245

Smart Meters Offer 'Instant Gratification;' Help Houston Homeowners  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meters Offer 'Instant Gratification;' Help Houston Meters Offer 'Instant Gratification;' Help Houston Homeowners Save Smart Meters Offer 'Instant Gratification;' Help Houston Homeowners Save July 1, 2011 - 12:15pm Addthis Houston resident Ruth Diorio explains to KPRC Local 2 News how much she's saved with her recently installed smart meter, which allows her to see her savings in real time. Houston resident Ruth Diorio explains to KPRC Local 2 News how much she's saved with her recently installed smart meter, which allows her to see her savings in real time. Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs What does this mean for me? Smart meters offer real time information on your energy use, which can help you lower your electricity bill. "Instant gratification" from a smart meter? So raves Houston homeowner Ruth

246

Scotia Energy Electricity - Net Metering Program (Nova Scotia, Canada) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scotia Energy Electricity - Net Metering Program (Nova Scotia, Scotia Energy Electricity - Net Metering Program (Nova Scotia, Canada) Scotia Energy Electricity - Net Metering Program (Nova Scotia, Canada) < Back Eligibility Agricultural Commercial Industrial Low-Income Residential Multi-Family Residential Residential Schools Savings Category Water Buying & Making Electricity Home Weatherization Solar Wind Program Info State Nova Scotia Program Type Net Metering Provider Nova Scotia Power, Inc Nova Scotia Power Inc. Net Metering allows residential and commercial customers to connect small, renewable energy generating units to the provincial power grid. Generating units that produce renewable energy such as wind, solar, small hydro or biomass can be added to homes or businesses with the addition of a bi-directional meter. This meter monitors the electricity generated by the

247

SCE&G - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SCE&G - Net Metering SCE&G - Net Metering SCE&G - Net Metering < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State South Carolina Program Type Net Metering In August 2009, the South Carolina Public Service Commission issued an order mandating net metering be made available by the regulated electric utilities; the order incorporates a net metering settlement signed by the individual interveners, the Office of Regulatory Staff and the three investor-owned utilities (IOUs). The order detailed the terms of net metering, including ownership of RECs, in South Carolina and standardized

248

E-Print Network 3.0 - automatic survey meter Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

management services such as fine grained pricing schemes, automatic meter reading, demand response... to demand measurement and billing. Meters supporting automatic meter reading...

249

E-Print Network 3.0 - automatic meter reading Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

fine grained pricing schemes, automatic meter reading, demand response... to demand measurement and billing. Meters supporting automatic meter reading (AMR) can report demand......

250

Radiation dose-rate meter using an energy-sensitive counter  

DOE Patents (OSTI)

A radiation dose-rate meter is provided which uses an energy-sensitive detector and combines charge quantization and pulse-rate measurement to monitor radiation dose rates. The charge from each detected photon is quantized by level-sensitive comparators so that the resulting total output pulse rate is proportional to the dose-rate.

Kopp, Manfred K. (Oak Ridge, TN)

1988-01-01T23:59:59.000Z

251

High Performance Computing Data Center Metering Protocol  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High Performance High Performance Computing Data Center Metering Protocol Prepared for: U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Federal Energy Management Program Prepared by: Thomas Wenning Michael MacDonald Oak Ridge National Laboratory September 2010 ii Introduction Data centers in general are continually using more compact and energy intensive central processing units, but the total number and size of data centers continues to increase to meet progressive computing requirements. In addition, efforts are underway to consolidate smaller data centers across the country. This consolidation is resulting in a growth of high-performance computing facilities (i.e. - supercomputers) which consume large amounts of energy to support the numerically intensive

252

The "Other" Energy in Buildings: Wireless Power Metering of Plug-in  

NLE Websites -- All DOE Office Websites (Extended Search)

The "Other" Energy in Buildings: Wireless Power Metering of Plug-in The "Other" Energy in Buildings: Wireless Power Metering of Plug-in Devices in Building 90 and Homes Speaker(s): Steven Lanzisera Date: June 17, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Anita Estner Miscellaneous and electronic devices consume about one-third of the primary energy used in U.S. buildings, and their energy use is increasing faster than other end-uses. Although these devices have been studied for 30 years, they are not as well understood as the other end-uses due to their great variety and difficulty in collecting representative energy data for them. This talk describes a method for collecting device-level energy use data for these devices using a relatively low-cost wireless mesh networking technology. Over 600 meters were deployed across B90 and three homes to

253

Substation grounding programs  

SciTech Connect

The five volume report comprises the user manual, installation, and validation manual and an applications guide for the SGA (Substation Grounding Analysis) software package. SGA consists of four computer programs: (1) SOMIP, (2) SMECC, (3) SGSYS, and (4) TGRND. The first three programs provide a comprehensive analysis tool for the design of substation grounding systems to meet safety standards. The fourth program, TGRND, provides a state of the art analysis tool for computing transient ground potential rise and ground system impedance. This part of the report, Volume 1, is a users manual and an installation and validation manual for the computer program SOMIP (SOil Measurement Interpretation Program). This program computes the best estimate of the parameters of a two layer soil model from usual soil resistivity measurements. Four pin or three pin soil measurements can be accommodated. In addition, it provides error bounds on the soil parameters for a given confidence level. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program SOMIP and provides two test cases for validation purposes. 4 refs.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). School of Electrical Engineering)

1992-05-01T23:59:59.000Z

254

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters. For the event, Congresswoman Doris Matsui (D-Sacramento) visited SMUD's customer service center and praised the program for implementing a system "that will be more efficient, more reliable, and better for consumers." SMUD's meter installations are nearly complete, with only a few thousand remaining. In addition to smart meters, SMUD's grid modernization efforts will include automated distribution systems, a

255

City of New Orleans - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of New Orleans - Net Metering City of New Orleans - Net Metering City of New Orleans - Net Metering < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Home Weatherization Program Info State Louisiana Program Type Net Metering Provider City Council Utilities Regulatory Office In May 2007, the New Orleans City Council adopted net-metering rules that are similar to rules adopted by the Louisiana Public Service Commission (PSC) in November 2005. The City Council's rules require Entergy New Orleans, an investor-owned utility regulated by the city, to offer net metering to customers with systems that generate electricity using solar energy, wind energy, hydropower, geothermal or biomass resources. Fuel

256

The Need for Essential Consumer Protections: Smart metering proposals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

metering metering proposals and the move to time-based pricing. August 2010 The Need for Essential Consumer Protections: Smart metering proposals and the move to time-based pricing. August 2010 There is widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems; (2) new digital metering systems for all customers; and (3) direct interfaces between the new metering systems and customers through inhome technologies. The Need for Essential Consumer Protections: Smart metering proposals and

257

SaskPower Net Metering (Saskatchewan, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SaskPower Net Metering (Saskatchewan, Canada) SaskPower Net Metering (Saskatchewan, Canada) SaskPower Net Metering (Saskatchewan, Canada) < Back Eligibility Commercial Agricultural Industrial Residential Savings Category Solar Buying & Making Electricity Program Info Funding Source SaskPower State Saskatchewan Program Type Net Metering Provider SaskPower Residents, farms and businesses with approved Environmental Preferred Technologies of up to 100 kilowatts (kW) of nominal (nameplate) generating capacity can deliver their excess electricity to our electrical grid. SaskPower will pay a one-time rebate, equivalent to 20% of eligible costs to a maximum payment of $20,000, for an approved and grid interconnected net metering project. The Net Metering Rebate is available to SaskPower, Saskatoon Light and Power and City of Swift Current electricity customers

258

U.S. Virgin Islands - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Virgin Islands - Net Metering U.S. Virgin Islands - Net Metering U.S. Virgin Islands - Net Metering < Back Eligibility Commercial Fed. Government Institutional Local Government Residential Schools State Government Tribal Government Savings Category Solar Buying & Making Electricity Wind Program Info Program Type Net Metering In February 2007, the U.S. Virgin Islands Public Services Commission approved a limited net-metering program for residential and commercial photovoltaic (PV), wind-energy or other renewable energy system up to 10 kilowatts (kW) in capacity. In July 2009, the legislature passed Act 7075 that raised the capacity limits to 20 kW for residential systems, 100 kW for commercial systems, and 500 kW for public (which includes government, schools, hospitals). The aggregate capacity limit of all net-metered systems is five megawatts

259

Murray City Power - Net Metering Pilot Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Murray City Power - Net Metering Pilot Program Murray City Power - Net Metering Pilot Program Murray City Power - Net Metering Pilot Program < Back Eligibility Commercial General Public/Consumer Residential Savings Category Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Utah Program Type Net Metering Provider Murray City Power Under a pilot program, Murray City Power offers net metering to customers that generate electricity using photovoltaic (PV), wind-electric or hydroelectric systems with a maximum capacity of 10 kilowatts (kW).* The utility will install and maintain a revenue meter capable of registering the bi-directional flow of electricity at the customer's facility. Any customer net excess generation (NEG) is carried over to the customer's next bill as a kilowatt-hour credit. Each April, any remaining NEG credits are

260

City of Brenham - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Brenham - Net Metering City of Brenham - Net Metering City of Brenham - Net Metering < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Institutional Nonprofit Residential Schools State Government Savings Category Bioenergy Wind Buying & Making Electricity Energy Sources Solar Program Info State Texas Program Type Net Metering Provider City of Brenham In September 2010, the City of Brenham passed an ordinance adopting net metering and interconnection procedures. Customer generators up to 10 megawatts (MW) are eligible to participate, although customer generators with systems 20 kilowatts (kW) or less are eligible for a separate rider and expedited interconnection. The utility will install and maintain a meter capable of measuring flow of electricity in both directions. Any net

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Utility-Scale Smart Meter Deployments, Plans & Proposals  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

edisonfoundation.net/IEE edisonfoundation.net/IEE Utility-Scale Smart Meter Deployments, Plans & Proposals April 2010 Utility State Target Number of Meters Notes Resources AEP 1 IN, KY, MI, OH, OK, TX, VA, WV 5,000,000 AEP plans on deploying smart meters to all customers within their service territory and have deployed 10,000 meters to customers in South Bend, IN, and are presently deploying another 700,000 to AEP-Texas customers. Timing for the remaining deployments will depend on specific conditions in each of the seven operating company subsidiaries. AEP Corporate Sustainability Report 2009 2 Allegheny Power MD, PA, WV 700,000 Allegheny launched pilots in Morgantown, WV and Urbana, MD to test smart meters and thermostats (1,140 meters installed). In PA, Act 129 (2008)

262

Test procedures help ensure accuracy of orifice meters  

SciTech Connect

Orifice meter measurement with a chart recorder has been a standard in the petroleum industry for years. The meter consists of the plate/tube and recorder, requires minimal maintenance and can accurately measure a wide range of flow rates. It must be routinely tested to ensure sustained accuracy. The orifice meter measures differential pressure, static pressure, and temperature. However, the accuracy of the measurement is only as good as the calibration devices used in the test. A typical meter test consists of meter calibration, orifice plate inspection, quality of gas tests, and documentation (test report) to verify the data. The paper describes 19 steps that a gas technician can follow to conduct a thorough meter test.

Fillman, C.R. [Coastal Flow Measurement, Inc., Houston, TX (United States)

1996-07-01T23:59:59.000Z

263

Discussion the Traceability of Quantity Value of Digital Watthour Meter  

Science Journals Connector (OSTI)

To resolve the traceability of quantity value and calibration of digital watt-hour meter, in this paper introduced working principium of digital electric power metering system briefly, and analyzed the main origin of error from the theory of digital watt-hour meter and its calibration device. This paper also proposed new verification method of digital watt-hour meter calibration device and project of digital watt-hour meter traceability of quantity value. The method is used in digital signal generator calibration. The traceability project is traceability to the national primary standard which is corresponding to the device using in the method. The project in this paper, which is figure out verification and traceability of quantity value from main origin of error, provides a reasonable approach to traceability of digital watt-hour meter and a useful reference to decriminalization of digital metrology. Meantime, the scheme provides strong technical support for construction of digital transformer substation and Smart Strong Grid.

Meng Xiangfu; Liu Yuchao; Wang Yuhua

2012-01-01T23:59:59.000Z

264

2,363 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,363 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO TOP OF 1" NYLON EYE INTO EYE SPLICE 20 METERS 1 1/8" NYLON 697.4 METERS 7/16" WIRE ROPE 35 METERS 40 METERS 700 METERS 3/4" SAS, Wrench tighten. ** 3/4" SAS WITH BUSHING, Wrench tighten. ** .5 METER 1/2" CHAIN

265

Basic DC Meter Design ECE 2100 Circuit Analysis Laboratory  

E-Print Network (OSTI)

Basic DC Meter Design ECE 2100 Circuit Analysis Laboratory updated 8 January 2008 Pre-Laboratory Assignment 1. Design an ammeter with full scale current IFS equal to 5 mA using a meter movement rated at 0.5 mA and 100 mV. 2. Design a voltmeter with a full scale voltage VFS equal to 10 V using the meter

Miller, Damon A.

266

Metering Best Practices: A Guide to Achieving Utility Resource...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Act of 2005. mbpg.pdf More Documents & Publications Operations & Maintenance Best Practices Guide: Chapter 8 Guidance for Electric Metering in Federal Buildings...

267

BELANGER, T. V., AND M. T. MONTGOMERY. Seepage meter errors  

Science Journals Connector (OSTI)

tor is applied, field test point estimates of seep- ..... Location, depth, and mean seepage rate for each meter in a transect across Indian River lagoon near.

2000-03-19T23:59:59.000Z

268

Maritime Electric- Net Metering (Prince Edward Island, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

In December 2005 The Renewable Energy Act and associated Regulations came into effect. A Government policy objective incorporated in the Act was the introduction of net metering for...

269

A spectral light absorption meter for measurements in the sea  

Science Journals Connector (OSTI)

Dec 17, 1974 ... the measuring period, that the horizontal di- ... ance in the upper few meters at high solar ... area of the spherical collector and the ratio.

2000-01-04T23:59:59.000Z

270

Stick-on Electricity Meter - Energy Innovation Portal  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Efficiency Find More Like This Return to Search Stick-on Electricity Meter Lawrence Berkeley National Laboratory Contact LBL About This Technology Publications:...

271

Wavelength meter having single mode fiber optics multiplexed inputs  

DOE Patents (OSTI)

A wavelength meter having a single mode fiber optics input is disclosed. The single mode fiber enables a plurality of laser beams to be multiplexed to form a multiplexed input to the wavelength meter. The wavelength meter can provide a determination of the wavelength of any one or all of the plurality of laser beams by suitable processing. Another aspect of the present invention is that one of the laser beams could be a known reference laser having a predetermined wavelength. Hence, the improved wavelength meter can provide an on-line calibration capability with the reference laser input as one of the plurality of laser beams.

Hackel, R.P.; Paris, R.D.; Feldman, M.

1993-02-23T23:59:59.000Z

272

Nevada Renewable Energy Application For Net Metering Customers...  

Open Energy Info (EERE)

Renewable Energy Application For Net Metering Customers Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Nevada Renewable Energy Application For Net...

273

The Intersection of Net Metering and Retail Choice: An Overview...  

Office of Environmental Management (EM)

five different theoretical models describing different ways competitive suppliers and utilities provide net metering options for their customers. They then provided case studies to...

274

The Need for Essential Consumer Protections: Smart metering proposals...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems; (2) new digital metering...

275

Wavelength meter having single mode fiber optics multiplexed inputs  

DOE Patents (OSTI)

A wavelength meter having a single mode fiber optics input is disclosed. The single mode fiber enables a plurality of laser beams to be multiplexed to form a multiplexed input to the wavelength meter. The wavelength meter can provide a determination of the wavelength of any one or all of the plurality of laser beams by suitable processing. Another aspect of the present invention is that one of the laser beams could be a known reference laser having a predetermined wavelength. Hence, the improved wavelength meter can provide an on-line calibration capability with the reference laser input as one of the plurality of laser beams.

Hackel, Richard P. (Livermore, CA); Paris, Robert D. (San Ramon, CA); Feldman, Mark (Pleasanton, CA)

1993-01-01T23:59:59.000Z

276

2,349 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE  

E-Print Network (OSTI)

2,349 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO 1" NYLON EYE INTO EYE SPLICE 697.4 METERS 7/16" WIRE ROPE 40 METERS 700 METERS 3/4" SAS, Wrench tighten. ** 3/4" SAS WITH BUSHING, Wrench tighten. ** .5 METER 1/2" CHAIN 5 TON SWIVEL INDUCTIVE CABLE BREAKOUT

277

Constancy of built-in luminance meter measurements in diagnostic displays  

SciTech Connect

Purpose: Liquid crystal displays used to interpret medical images are often equipped with built-in luminance meters to evaluate luminance response and Grayscale Standard Display Function conformance. This work evaluates agreement between luminance reported by the built-in meters and external measurements. Methods: The white level luminance was measured using a built-in meter and an external meter for 93 primary review workstations (Models MFGD 3420 and MDCG 3120-CB) with between 117 and 49?336 backlight hours (BLH). Measured luminance values were compared viat-test for displays with less than 25?000 BLH and those with more than 25?000 BLH. Bias between meters was also evaluated. Changes in luminance uniformity with increasing backlight hours were explored by determining the maximum luminance deviation (MLD) for subsets of these displays with less than 800 BLH and greater than 35?000 BLH. Results: The mean difference between built-in and external luminance measurements was 5.84% and 38.92% for displays with less than 25?000 and greater than 25?000 BLH, respectively, with a statistically significant difference in the means (p < 0.001). For displays with low BLH, a statistically significant bias was observed (p < 0.001) between built-in and external measurements. A high degree of correlation was observed between measurements made with two separate external meters (r = 0.999). The mean MLD was 9.5% and 11.2% for MDCG 3120-CB displays with less than 800 and greater than 35?000 BLH, respectively. The difference in the mean values was not statistically significant (p < 0.001). Conclusions: Disagreement between the white level luminance measured using the built-in and external meter increased with BLH. Consequently, reliance on values reported by the built-in luminance meter may result in a reduction in image contrast with time. Recommendations have been proposed regarding luminance response testing and corrective action for failing displays.

Silosky, M., E-mail: michael.silosky@ucdenver.edu; Marsh, R. M. [Department of Radiology, University of Colorado, School of Medicine Aurora, Colorado 80045 (United States)] [Department of Radiology, University of Colorado, School of Medicine Aurora, Colorado 80045 (United States)

2013-12-15T23:59:59.000Z

278

NLS ground states on graphs  

E-Print Network (OSTI)

We investigate the existence of ground states for the subcritical NLS energy on metric graphs. In particular, we find out a topological assumption that guarantees the nonexistence of ground states, and give an example in which the assumption is not fulfilled and ground states actually exist. In order to obtain the result, we introduce a new rearrangement technique, adapted to the graph where it applies. Owing to such a technique, the energy level of the rearranged function is improved by conveniently mixing the symmetric and monotone rearrangement procedures.

Riccardo Adami; Enrico Serra; Paolo Tilli

2014-06-16T23:59:59.000Z

279

Recent developments in orifice meter and flow conditioner research  

SciTech Connect

In 1969 concerns were raised regarding the validity of the orifice meter`s coefficient of discharge uncertainty. An effort to resolve these concerns resulted in an internationally supported research project which produced a new sharp-edged concentric orifice meter empirical database and coefficient of discharge equation. However, the new empirical database and coefficient of discharge equation did not account for all of the differences being encountered in orifice metering. And in 1986, as a derivative of the coefficient of discharge equation research, questions were raised regarding the influences of installation effects on the orifice meter`s coefficient of discharge. The 1986 EC research data indicated that the flow conditioner and straight pipe installation requirements of the flow measurement standards were inadequate to prevent biasing of the orifice meter`s coefficient of discharge by flow disturbances generated from upstream piping elements. Data generated from 1990 through 1993 by GRI sponsored SWRI and NIST research confirmed the original EC biasing and further identified differential pressure tap radial position sensitivity and velocity profile and swirl angle theory deficiencies. Current research is continuing to define installation effects influences and identify possible solutions.

LaNasa, P.J. [CPL and Associates, Houston, TX (United States)

1995-12-31T23:59:59.000Z

280

Multiphase pumps and flow meters avoid platform construction  

SciTech Connect

One of the newest wrinkles in efficiency in BP`s Eastern Trough Area Project (ETAP) is the system for moving multiphase oil, water and gas fluids from the Machar satellite field to the Marnock Central Processing Facility (CPF). Using water-turbine-driven multiphase pumps and multiphase flow meters, the system moves fluid with no need for a production platform. In addition, BP has designed the installation so it reduces and controls water coning, thereby increasing recoverable reserves. Both subsea multiphase booster stations (SMUBS) and meters grew out of extensive development work and experience at Framo Engineering AS (Framo) in multiphase meters and multiphase pump systems for subsea installation. Multiphase meter development began in 1990 and the first subsea multiphase meters were installed in the East Spar Project in Australia in 1996. By September 1998, the meters had been operating successfully for more than 1 year. A single multiphase meter installed in Marathon`s West Brae Project has also successfully operated for more than 1 year. Subsea meters for ETAP were installed and began operating in July 1998.

Elde, J.

1999-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Energy Secretary Chu Announces Five Million Smart Meters Installed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Five Million Smart Meters Installed Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort Energy Secretary Chu Announces Five Million Smart Meters Installed Nationwide as Part of Grid Modernization Effort June 13, 2011 - 12:00am Addthis Washington, DC - At a White House Grid Modernization event today, U.S. Department of Energy Secretary Steven Chu announced that more than five million smart meters have been installed nationwide as part of Recovery Act-funded efforts to accelerate modernization of the Nation's electric grid. Smart meters will provide utility companies with greater information about how much electricity is being used throughout their service areas. They will also give consumers access to real-time information about their energy consumption, allowing them to make well-informed decisions about how

282

Grays Harbor PUD - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Grays Harbor PUD - Net Metering < Back Eligibility Commercial Industrial Residential Savings Category Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State District of Columbia Program Type Net Metering Provider Grays Harbor PUD Grays Harbor PUD's net-metering program differs slightly from what is required by Washington state law in that Grays Harbor PUD reimburses customers for net excess generation (NEG), at the end of each year, at 50% of the utility's retail rate. State law allows utilities to require customers to surrender NEG to the utility, without reimbursement, at the end of a 12-month billing cycle. Grays Harbor PUD has voluntarily gone

283

Smart Meters Help Balance Energy Consumption at Solar Decathlon |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meters Help Balance Energy Consumption at Solar Decathlon Smart Meters Help Balance Energy Consumption at Solar Decathlon Smart Meters Help Balance Energy Consumption at Solar Decathlon September 28, 2011 - 10:57am Addthis The Team Tidewater Virginia smart meter, as seen on opening day, indicates the team generated 5 kW hours of electricity in the first several hours of the competition. | Image courtesy of Lachlan Fletcher, Studio 18a The Team Tidewater Virginia smart meter, as seen on opening day, indicates the team generated 5 kW hours of electricity in the first several hours of the competition. | Image courtesy of Lachlan Fletcher, Studio 18a Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs Clouds, rain, thunderstorms... at Solar Decathlon Village? Oh my, you may say. But less-than-ideal weather conditions are no match for this year's

284

Smart Meter Company Boosting Production, Workforce | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meter Company Boosting Production, Workforce Smart Meter Company Boosting Production, Workforce Smart Meter Company Boosting Production, Workforce September 30, 2010 - 10:53am Addthis Kevin Craft What does this mean for me? This South Carolina company is producing enough smart meters to reduce annual electricity use by approximately 1.7 million megawatt hours Smart meters provide detailed data on energy usage to both utilities and consumers and is a key component of the Smart Grid. In 2009, Itron Inc.'s manufacturing facility in West Union, South Carolina was the third largest industrial employer in Oconee County. Then, the company used a $5.2 million 48C Advanced Manufacturing Tax Credit awarded via the Recovery Act to re-equip the facility and hired 420 additional employees. "Improving our production capacity allowed us to hire more employees, and

285

Smart Meter Company Boosting Production, Workforce | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meter Company Boosting Production, Workforce Smart Meter Company Boosting Production, Workforce Smart Meter Company Boosting Production, Workforce September 30, 2010 - 10:53am Addthis Kevin Craft What does this mean for me? This South Carolina company is producing enough smart meters to reduce annual electricity use by approximately 1.7 million megawatt hours Smart meters provide detailed data on energy usage to both utilities and consumers and is a key component of the Smart Grid. In 2009, Itron Inc.'s manufacturing facility in West Union, South Carolina was the third largest industrial employer in Oconee County. Then, the company used a $5.2 million 48C Advanced Manufacturing Tax Credit awarded via the Recovery Act to re-equip the facility and hired 420 additional employees. "Improving our production capacity allowed us to hire more employees, and

286

Smart Meters Help Balance Energy Consumption at Solar Decathlon |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meters Help Balance Energy Consumption at Solar Decathlon Smart Meters Help Balance Energy Consumption at Solar Decathlon Smart Meters Help Balance Energy Consumption at Solar Decathlon September 28, 2011 - 10:57am Addthis The Team Tidewater Virginia smart meter, as seen on opening day, indicates the team generated 5 kW hours of electricity in the first several hours of the competition. | Image courtesy of Lachlan Fletcher, Studio 18a The Team Tidewater Virginia smart meter, as seen on opening day, indicates the team generated 5 kW hours of electricity in the first several hours of the competition. | Image courtesy of Lachlan Fletcher, Studio 18a Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs Clouds, rain, thunderstorms... at Solar Decathlon Village? Oh my, you may say. But less-than-ideal weather conditions are no match for this year's

287

Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Million Smart Grid Meters Installed Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an event today at Battelle headquarters in Columbus, Ohio, U.S. Energy Secretary Steven Chu announced that two million smart grid meters have been installed across the country, helping to reduce energy costs for families and businesses. As a result of funding from the Recovery Act, smart grid technology is speeding the modernization of the nation's electrical grid, helping to reduce the amount of time needed to respond to energy disruptions and enable consumers to monitor their energy consumption and costs. So far, more than 180,000 smart meters have been installed in Ohio. "As a result of an unprecedented investment from the Recovery Act, smart

288

Smart Meters on Tap for Owasso, Oklahoma | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meters on Tap for Owasso, Oklahoma Meters on Tap for Owasso, Oklahoma Smart Meters on Tap for Owasso, Oklahoma September 10, 2010 - 12:52pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this mean for me? Recovery Act-funded smart meter pilot project will help residents lower utility bills. Smart meter installations help utility company respond quicker to power outages. Seeing real-time energy use could help cities save 10% of their annual energy consumption. Owasso, Oklahoma, known as the "city with no limits," is living up to its name with sustainability and energy. The evidence is everywhere. You can't visit the city's website -- or Facebook, Twitter and Flickr accounts, for that matter -- without noticing its robust recycling and composting program, water conversation focus or

289

Analysis of water-level data in the Yucca Mountain area, Nevada, 1985--95  

SciTech Connect

From 1985 through 1995, a water-level network that consists of 28 wells for monitoring 36 depth intervals has been maintained in the Yucca Mountain area. The network includes wells that were measured manually, approximately monthly, and/or measured hourly with a transducer/data logger system. Manual water-level measurements were made with either calibrated steel tapes or single or multiconductor-cable units. All wells monitor water levels in Tertiary volcanic rocks, except one that monitors water levels in Paleozoic carbonate rocks. Annual mean water-level altitudes for all wells for the period 1985-95 ranged from 727.93 to 1,034.60 meters. The maximum range in water-level change between monthly measurements and/or monthly mean values was 12.22 meters in well USW H-3 lower interval, and the minimum range was 0.31 meter in wells UE-25 b-1 upper interval, and J-11. In 31 of the 36 depth intervals monitored, the range of water-level change was less than 1 meter. The range of standard deviation of all depth interval measurements for all wells that were monitored was 0.053 to 3.098 meters. No seasonal water-level trends were detected in any of the wells, and regional ground-water withdrawals did not appear to cause water-level changes. Most annual water-level fluctuations can be attributed to barometric and Earth-tide changes. Regional earthquakes, which occurred on June 28--29, 1992, might have simultaneously affected the water level in seven wells. Periods of rising and declining water levels were observed in most wells. However, 11 years of record were not sufficient to determine if these periods were cyclic. Because a goal of monitoring water levels at Yucca Mountain is to determine if there are water-level trends that could affect the potential repository, observed water-level changes over the period of this report may not be representative of the overall long-term trends in water levels.

Graves, R.P.; Tucci, P.; O`Brien, G.M.

1997-12-31T23:59:59.000Z

290

Chevron facility focused on commercial orifice-meter research  

SciTech Connect

Research to determine the accuracy of commercial orifice meters for custody-transfer measurement has indicated that high-volume gas meters can be flow-proven while in such service. The research further yielded more accurate orifice-meter discharge coefficient equations (at Reynolds numbers greater than 4,000,000) than current equations of the International Standards Organization (ISO) and the American Petroleum Institute (API). These are partial findings of a major study conducted by Chevron Oil Field Research Co. at its Venice, La., calibration facility.

Jones, E.H.; Ferguson, K.R.

1987-07-27T23:59:59.000Z

291

Parity meter for charge qubits: an efficient quantum entangler  

E-Print Network (OSTI)

We propose a realization of a charge parity meter based on two double quantum dots alongside a quantum point contact. Such a device is a specific example of the general class of mesoscopic quadratic quantum measurement detectors previously investigated by Mao et al. [Phys. Rev. Lett. 93, 056803 (2004)]. Our setup accomplishes entangled state preparation by a current measurement alone, and allows the qubits to be effectively decoupled by pinching off the parity meter. Two applications of the parity meter are discussed: the measurement of Bell's inequality in charge qubits and the realization of a controlled NOT gate.

B. Trauzettel; A. N. Jordan; C. W. J. Beenakker; M. Buttiker

2006-04-26T23:59:59.000Z

292

How to Read Your Electric Meter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Your Electric Meter Your Electric Meter How to Read Your Electric Meter July 2, 2012 - 8:21pm Addthis The difference between one month's reading and the next is the amount of energy units that have been used for that billing period. | Photo courtesy of Warren Gretz, NREL. The difference between one month's reading and the next is the amount of energy units that have been used for that billing period. | Photo courtesy of Warren Gretz, NREL. What are the key facts? The basic unit of measure of electric power is the Watt, and one thousand Watts are called a kilowatt. Your electric utility bills you by the kilowatt-hour -- the number of kilowatts you use per hour. When reading an electric meter, read and write down the numbers as shown on the dials from right to left. You may also wish to contact your local utility company for more

293

City of Danville - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Danville - Net Metering Danville - Net Metering City of Danville - Net Metering < Back Eligibility Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Program Info State Virginia Program Type Net Metering For a renewable fuel generator with a capacity of 25 kilowatts (kW) or less, a notification form shall be submitted at least 30 days prior to the date the customer intends to interconnect their renewable fuel generator to the Utility's facilities. Renewable fuel generators with capacity over 25 kW are required to submit forms no later than 60 days prior to planned interconnection. The Utility will review and determine whether the requirements for Interconnection have been met. More information on this

294

Smart Meters Helping Oklahoma Consumers Save Hundreds During Summer Heat |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meters Helping Oklahoma Consumers Save Hundreds During Summer Smart Meters Helping Oklahoma Consumers Save Hundreds During Summer Heat Smart Meters Helping Oklahoma Consumers Save Hundreds During Summer Heat July 26, 2011 - 4:27pm Addthis Small business owner Steve Kaplan told ABC News’ “Show Me the Money” on Good Morning America that he's saving over $320 per month compared to last summer, which they calculated could result in $1,300 a year. Small business owner Steve Kaplan told ABC News' "Show Me the Money" on Good Morning America that he's saving over $320 per month compared to last summer, which they calculated could result in $1,300 a year. Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs What does this mean for me? Utility-provided meters give consumers real-time information on how

295

How to Read Your Electric Meter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How to Read Your Electric Meter How to Read Your Electric Meter How to Read Your Electric Meter July 2, 2012 - 8:21pm Addthis The difference between one month's reading and the next is the amount of energy units that have been used for that billing period. | Photo courtesy of Warren Gretz, NREL. The difference between one month's reading and the next is the amount of energy units that have been used for that billing period. | Photo courtesy of Warren Gretz, NREL. What are the key facts? The basic unit of measure of electric power is the Watt, and one thousand Watts are called a kilowatt. Your electric utility bills you by the kilowatt-hour -- the number of kilowatts you use per hour. When reading an electric meter, read and write down the numbers as shown on the dials from right to left.

296

Two Million Smart Meters and Counting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Million Smart Meters and Counting Million Smart Meters and Counting Two Million Smart Meters and Counting August 31, 2010 - 6:02pm Addthis Elizabeth Meckes Elizabeth Meckes Director of User Experience & Digital Technologies, Office of Public Affairs What does this mean for me? Smart meter technology will help families and businesses cut their energy costs by reducing response time for energy disruptions and enabling consumers to better monitor their consumption. The implementation of smart grid technologies could reduce electricity use by more than four percent annually by 2030 -- that would mean consumers around the country would see savings of over $20 billion each year. Secretary Steven Chu visited Battelle headquarters in Columbus, Ohio, today to make a big announcement about our nation's electrical grid: an

297

Category:Smart Grid Projects - Advanced Metering Infrastructure | Open  

Open Energy Info (EERE)

Metering Infrastructure Metering Infrastructure Jump to: navigation, search Smart Grid Projects - Advanced Metering Infrastructure category Pages in category "Smart Grid Projects - Advanced Metering Infrastructure" The following 31 pages are in this category, out of 31 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project C CenterPoint Energy Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project City of Fulton, Missouri Smart Grid Project City of Glendale Water and Power Smart Grid Project City of Quincy, FL Smart Grid Project City of Westerville, OH Smart Grid Project

298

A continuous reading fluorescence meter for eddy diffusion studies  

E-Print Network (OSTI)

LIBRARY A AIS COLLEGE OF TEXAS A CONTINUOUS READINO FLUORESCENCE METER FOR EDDY DIFFUSION STUDIES BY Frank Wooten Moon, Jr. A Thesis Submitted to ths Qraduate Scbool of the Agricultural and Mechanical College oi' Texas in partial...

Moon, Frank Wooten

1956-01-01T23:59:59.000Z

299

Value creation and value capture of advanced electricity meter information  

E-Print Network (OSTI)

Advanced or smart metering has been a hot topic in the electricity community for several years. Despite the excitement about the technology, few business cases are actually able to justify the investment cost. One reason ...

Oesterlin, Ulf

2011-01-01T23:59:59.000Z

300

Radiofrequency fields associated with the Itron smart meter  

Science Journals Connector (OSTI)

......density enhancement factor of (1.6)2 or 2.56 for use in Equation (A1). REFERENCES 1 FERC. Assessment of Demand Response and Advanced Metering. (2008) Federal Energy Regulatory Commission. 2 FCC. Evaluating Compliance with FCC Guidelines......

R. A. Tell; G. G. Sias; A. Vazquez; J. Sahl; J. P. Turman; R. I. Kavet; G. Mezei

2012-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

25 years ago: the official farewell to the meter  

E-Print Network (OSTI)

On october 21st 1983 took place in S\\`evres on the western outskirts of Paris the official funeral of the meter. With it the notion of distance as a physical observable was buried.

Thomas Schucker

2008-10-20T23:59:59.000Z

302

LM to Meet Energy Metering Goals Through Enhanced Data Collection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

usage and metering. The first goal states that LM should reduce energy use intensity (EUI) by 30 percent by fiscal year (FY) 2020, as compared to the FY 2003 baseline. The...

303

Metering and Calibration in LoanSTAR Buildings  

E-Print Network (OSTI)

or many stories away from each other. Power measurements across multiple panels can increase costs dramatically. Buildings often have multiple electrical feeds or feed additional buildings. Asbestos is found in many chilled and hot water piping... installed before 1970. Installation of thermal metering requires asbestos abatement. The cost to remove the asbestos may be too high to justify the thermal metering. (6) Timely installation of equipment requires an intensive coordination effort during...

O'Neal, D. L.; Bryant, J. A.; Turner, W. D.; Glass, M. G.

1990-01-01T23:59:59.000Z

304

Ground water and energy  

SciTech Connect

This national workshop on ground water and energy was conceived by the US Department of Energy's Office of Environmental Assessments. Generally, OEA needed to know what data are available on ground water, what information is still needed, and how DOE can best utilize what has already been learned. The workshop focussed on three areas: (1) ground water supply; (2) conflicts and barriers to ground water use; and (3) alternatives or solutions to the various issues relating to ground water. (ACR)

Not Available

1980-11-01T23:59:59.000Z

305

Modeling demand response and economic impact of advanced and smart metering  

Science Journals Connector (OSTI)

Advanced metering constitutes an essential component of communications between electricity suppliers and consumers. It may be possible to augment demand response by coupling Advanced Metering Infrastructure (AMI)...

Praneeth Aketi; Suvrajeet Sen

2014-09-01T23:59:59.000Z

306

Building a wireless mesh networked real-time electricity metering system in an MIT dormitory .  

E-Print Network (OSTI)

??A competitive, closed-loop information feedback system of wireless electricity meters was designed, tested, and implemented in seven MIT dormitory rooms. The meters utilized Allegro Hall (more)

Oehlerking, Austin L

2009-01-01T23:59:59.000Z

307

Ground water provides drinking water, irrigation for  

E-Print Network (OSTI)

Ground water provides drinking water, irrigation for crops and water for indus- tries. It is also connected to surface waters, and maintains the flow of rivers and streams and the level of wetlands- tion of those along Lake Michigan, most communi- ties, farms and industries still rely on ground water

Saldin, Dilano

308

Smart Meters and a Smarter Grid | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meters and a Smarter Grid Smart Meters and a Smarter Grid Smart Meters and a Smarter Grid May 16, 2011 - 4:40pm Addthis Andrea Spikes Communicator at DOE's National Renewable Energy Laboratory Have you heard of smart meters? Do you understand them? If so, you've had a leg up on me until now. I've heard of smart meters here and there from the odd news article or website, but to me the grapevine has been more like an invisible beehive: all buzz and no honey. Where are they? Why don't I have one yet, and will I have to buy it to be part of the system? Do they really save energy? Is Big Brother counting my kilowatts for me now, or what? These are the questions that don't keep me up at night, but I suspect more and more people are asking. Photo credit: U.S. Department of Energy We talked about what a Smart Grid is in February. The standard electrical

309

Compensated count-rate circuit for radiation survey meter  

DOE Patents (OSTI)

A count-rate compensating circuit is provided which may be used in a portable Geiger-Mueller (G-M) survey meter to ideally compensate for counting loss errors in the G-M tube detector. In a G-M survey meter, wherein the pulse rate from the G-M tube is converted into a pulse rate current applied to a current meter calibrated to indicate dose rate, the compensated circuit generates and controls a reference voltage in response to the rate of pulses from the detector. This reference voltage is gated to the current-generating circuit at a rate identical to the rate of pulses coming from the detector so that the current flowing through the meter is varied in accordance with both the frequency and amplitude of the reference voltage pulses applied thereto so that the count rate is compensated ideally to indicate a true count rate within 1% up to a 50% duty cycle for the detector. A positive feedback circuit is used to control the reference voltage so that the meter output tracks true count rate indicative of the radiation dose rate.

Todd, Richard A. (Powell, TN)

1981-01-01T23:59:59.000Z

310

Compensated count-rate circuit for radiation survey meter  

DOE Patents (OSTI)

A count-rate compensating circuit is provided which may be used in a portable Geiger-Mueller (G-M) survey meter to ideally compensate for couting loss errors in the G-M tube detector. In a G-M survey meter, wherein the pulse rate from the G-M tube is converted into a pulse rate current applied to a current meter calibrated to indicate dose rate, the compensation circuit generates and controls a reference voltage in response to the rate of pulses from the detector. This reference voltage is gated to the current-generating circuit at a rate identical to the rate of pulses coming from the detector so that the current flowing through the meter is varied in accordance with both the frequency and amplitude of the reference voltage pulses applied thereto so that the count rate is compensated ideally to indicate a true count rate within 1% up to a 50% duty cycle for the detector. A positive feedback circuit is used to control the reference voltage so that the meter output tracks true count rate indicative of the radiation dose rate.

Todd, R.A.

1980-05-12T23:59:59.000Z

311

GROUND LEVEL INVESTIGATION OF ANOMALOUS RADIATION LEVELS IN NIAGARA...  

Office of Legacy Management (LM)

Oak Ridge, Tennessee 37630 O&J. 2,7 +, 7&y' March 1979 operated by UNION CARBIDE CORPORATIOII for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-...

312

Ground Vibration Measurement  

Science Journals Connector (OSTI)

Measurement of ground vibration is important for checking of amplitudes of ... confirmation of efficiency of control measures of ground vibration. The properties of measuring instruments used can affect the resul...

Dr. Milutin Srbulov

2010-01-01T23:59:59.000Z

313

Smart Meter Investments Support Rural Economy in Arkansas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meter Investments Support Rural Economy in Arkansas Smart Meter Investments Support Rural Economy in Arkansas Woodruff Electric Cooperative (Woodruff) serves customers in seven eastern Arkansas counties. The proportion of residents living in poverty in those counties is more than double the national average. As a member-owned rural electric cooperative, Woodruff is connected to its customers and engaged in economic development efforts to bring more jobs and higher incomes to local communities. In order to bring the capital investment and its accompanying economic benefits to the region without delay, Woodruff completed its project installation ahead of schedule. With a total budget of $5 million, funded partially with nearly $2.4 million in Recovery Act funding from the U.S. Department of Energy (DOE), Woodruff was able to install 14,450 smart meters and supporting

314

Cyprus Smart metering demo (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Cyprus Smart metering demo (Smart Grid Project) Cyprus Smart metering demo (Smart Grid Project) Jump to: navigation, search Project Name Cyprus Smart metering demo Country Cyprus Coordinates 35.126411°, 33.429859° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.126411,"lon":33.429859,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

315

Working With Your Utility to Obtain Metering Services  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dykes Dykes Federal Segment Mgr Georgia Power/Southern Company Wednesday, 22 May 2013 Federal Utility Partnership Working Group Spring 2013 - May 22-23 San Francisco, CA Hosted by: Pacific Gas and Electric Company  What is the Government Requirement ◦ New DoD Directive  What is Available from Your Serving Utility  Customer Metering Services  Issues to Consider  Conclusion 4.4 million customers 42,000+ MW 27,000 miles of transmission lines 3,700 substations 26,000 employees Other subsidiaries: Southern Linc, Southern Power, Southern Telecom, Southern Nuclear Retail Service Territory across 120,000 square miles  Section 103, EPAct 2005 - All Federal Agencies ◦ Meter electricity on all facilities 30,000 SqFt and larger ◦ Meter those facilities with significant energy usage

316

Microsoft Word - CLPUD Revenue Metering CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Gregory Vassallo Gregory Vassallo TPC-ALVEY Proposed Action: New Revenue Meters at Central Lincoln's Florence and Berrydale Substations Budget Information: Work Order # 00004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility... Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade revenue metering at Central Lincoln People's Utility District's (Central Lincoln) Florence and Berrydale Substations to 115-kV. Bonneville will retire the 12.5-kV revenue metering at Central Lincoln's Florence, Berrydale, and Heceta Beach Substations once

317

Microsoft Word - CX -Lewis County PUD metering_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-Olympia Proposed Action: Installation of metering equipment at existing facilities for power scheduling. Budget Information: Work order 00202861, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area... Location: Lewis County, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to install meter equipment at multiple locations in Lewis County, Washington. The project is needed as Lewis county PUD plans to become a BPA Slice customer and needs to obtain meter data at 5 minute intervals. The

318

Entropy Meters and the Entropy of Non-extensive Systems  

E-Print Network (OSTI)

In our derivation of the second law of thermodynamics from the relation of adiabatic accessibility of equilibrium states we stressed the importance of being able to scale a system's size without changing its intrinsic properties. This leaves open the question of defining the entropy of macroscopic, but unscalable systems, such as gravitating bodies or systems where surface effects are important. We show here how the problem can be overcome, in principle, with the aid of an `entropy meter'. An entropy meter can also be used to determine entropy functions for non-equilibrium states and mesoscopic systems.

Elliott H. Lieb; Jakob Yngvason

2014-03-30T23:59:59.000Z

319

Accurate 100:1 Rangeability Linear Response Head Meter  

E-Print Network (OSTI)

as regards its sensitivity to changes in density, ie; a change of 1% in density results in a metering error of 1/2%. The compensation equation is: mass flow Qm volumetric f 10\\'/Qv Additionally, factors such as vapor expansion and thermal expansion... as regards its sensitivity to changes in density, ie; a change of 1% in density results in a metering error of 1/2%. The compensation equation is: mass flow Qm volumetric f 10\\'/Qv Additionally, factors such as vapor expansion and thermal expansion...

Grant, G. H.

320

Commercial Buildings Partnership Projects - Metered Data Format and Delivery  

SciTech Connect

A number of the Commercial Building Partnership Projects (CBPs) will require metering, monitoring, data analysis and verification of savings after the retrofits are complete. Although monitoring and verification (M&V) agents are free to use any metering and monitoring devices that they chose, the data they collect should be reported to Pacific Northwest National Laboratory (PNNL) in a standard format. PNNL will store the data collected in its CBP database for further use by PNNL and U.S. Department of Energy. This document describes the data storage process and the deliver format of the data from the M&V agents.

Katipamula, Srinivas

2010-11-16T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

US Recovery Act Smart Grid Projects - Advanced Metering Infrastructure |  

Open Energy Info (EERE)

Projects - Advanced Metering Infrastructure Projects - Advanced Metering Infrastructure Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

322

Microwave Pickup on the Crawford Hill 7-meter Jeff McMahon  

E-Print Network (OSTI)

Microwave Pickup on the Crawford Hill 7-meter Telescope Jeff McMahon Project Advisor: Suzanne-Meter Telescope The Crawford Hill 7-meter telescope located at Bell labs in Holmdel, New Jersey is being considered for use in the CapMAP project. This antenna is a 7-meter offset Cassegrain reflector antenna

323

EVALUATING EFFECTIVENESS OF RAMP Evidence from the twin cities ramp meter shut-off  

E-Print Network (OSTI)

Chapter 9 EVALUATING EFFECTIVENESS OF RAMP METERS Evidence from the twin cities ramp meter shut-625-6354 Abstract: Ramp meters in the Twin Cities have been turned off for eight weeks in Fall 2000 in an experiment representative freeways during the afternoon peak period. Several performance measures for ramp metering

Levinson, David M.

324

Active fault creep variations at Chihshang, Taiwan, revealed by creep meter monitoring, 19982001  

E-Print Network (OSTI)

Active fault creep variations at Chihshang, Taiwan, revealed by creep meter monitoring, 1998] The daily creep meter data recorded at Chihshang in 1998­2001 are presented. The Chihshang creep meter similar annual shortening rates: 16.2 mm at the Tapo site (comprising two connected creep meters) and 15

Lee, Jian-Cheng

325

How to Read Residential Electric and Natural Gas Meters | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Electric and Natural Gas Meters Residential Electric and Natural Gas Meters How to Read Residential Electric and Natural Gas Meters June 24, 2012 - 3:00pm Addthis An electromechanical electric meter on the side of a house. | Photo courtesy of ©iStockphoto/epantha An electromechanical electric meter on the side of a house. | Photo courtesy of ©iStockphoto/epantha A digital electric meter on the side of a house. | Photo courtesy of ©iStockphoto/nbehmans A digital electric meter on the side of a house. | Photo courtesy of ©iStockphoto/nbehmans A natural gas meter on a house. | Photo courtesy of ©iStockphoto/fstockfoto A natural gas meter on a house. | Photo courtesy of ©iStockphoto/fstockfoto An electromechanical electric meter on the side of a house. | Photo courtesy of ©iStockphoto/epantha

326

Appendix D Surface Water and Ground Water Time-Concentration Plots,  

Office of Legacy Management (LM)

Surface Water and Ground Water Time-Concentration Plots, Surface Water and Ground Water Time-Concentration Plots, Stream Discharge Measurements, Ground Water Level Data, and Ground Water Well Hydrographs This page intentionally left blank Contents Section .................................................................................. Surface Water Time-Concentration Plots D1.O ............................................................................................... Stream Discharge Measurements D2.0 ............................................................. Ground Water Time-Concentration Plots for Uranium D3.0 .......................................................................................................... Ground Water Level Data D4.0 ..............................................................................................

327

P\\procedure\\EU#7 Page 1 of 2 TITLE: PROCEDURE FOR RECORDING AND TRANSMITTING METER READINGS  

E-Print Network (OSTI)

P\\procedure\\EU#7 Page 1 of 2 TITLE: PROCEDURE FOR RECORDING AND TRANSMITTING METER READINGS FOR NEW METER SETS, METER REPLACEMENTS AND WHEN THE ACCOUNTABILITY FOR THE METERS USAGE CHANGES OBJECTIVE AND PURPOSE: To provide a timely and accurate method of capturing meter readings when a meter is changed out

Fernandez, Eduardo

328

1. From the Mail Services website, (www.princeton.edu/mail) click on Metered Mail to access the Meter Request Form.  

E-Print Network (OSTI)

1. From the Mail Services website, (www.princeton.edu/mail) click on Metered Mail to access the Meter Request Form. 2. Log in using your Princeton NetID and password. The system will pre the drop-down menu. To enter a new chartstring, click "Create New." Online Meter Request Form A step

Singh, Jaswinder Pal

329

Advanced computational simulation of flow phenomena associated with orifice meters  

SciTech Connect

This paper presents and discusses results from a series of computational fluid dynamics (CFD) simulations of fluid flow phenomena associated with orifice meters. These simulations were performed using a new, state-of-the-art CFD code developed at Southwest Research Institute. This code is based on new techniques designed to take advantage of parallel computers to increase computational performance and fidelity of simulation results. This algorithm uses a domain decomposition strategy to create grid systems for very complex geometries composed of simpler geometric subregions, allowing for the accurate representation of the fluid flow domain. The domain decomposition technique maps naturally to parallel computer architectures. Here, the concept of message-passing is used to create a parallel algorithm, using the Parallel Virtual Machine (PVM) library. This code is then used to simulate the flow through an orifice meter run consisting of an orifice with a beta ratio of 0.5 and air flowing at a Reynolds number of 91,100. The work discussed in this paper is but the first step in developing a Virtual Metering Research Facility to support research, analysis, and formulation of new standards for metering.

Freitas, C.J. [Southwest Research Inst., San Antonio, TX (United States)

1995-12-31T23:59:59.000Z

330

Advanced accelerator simulation research: miniaturizing accelerators from kilometers to meters  

E-Print Network (OSTI)

Advanced accelerator simulation research: miniaturizing accelerators from kilometers to meters W: Advanced accelerator research is aimed at finding new technologies that can dramatically reduce the size and cost of future high-energy accelerators. Supercomputing is already playing a dramatic and critical role

Geddes, Cameron Guy Robinson

331

Multi-vendor Penetration Testing in the Advanced Metering Infrastructure  

E-Print Network (OSTI)

Infrastructure (AMI) is changing the way electric energy is produced, priced, and consumed. The introduction,mcdaniel}@cse.psu.edu Abstract - The advanced metering infrastructure (AMI) is revolutionizing electrical grids. Intelligent AMI we develop an archetypal attack tree approach to guide penetration testing across multiple

McDaniel, Patrick Drew

332

The Statewide Benefits Of Net-Metering In California  

E-Print Network (OSTI)

on the costs and benefits of NEM to the Governor and Legislature. 4 Id. 5 California Solar Future: Growing to the total, "bundled" energy rate, which includes not only the cost of generation, but transmission of 2013 3 See Net Energy Metering Cost-Effectiveness Evaluation, Energy and Environmental Economics, Inc

Kammen, Daniel M.

333

Secure and robust multipath routings for advanced metering infrastructure  

Science Journals Connector (OSTI)

A Smart Grid is the modernization of the electricity grid using communication technology with the prime goals of reducing energy consumption as well as cost increasing reliability and creating new services for all participants. It comprises key components ... Keywords: Advanced Metering Infrastructure, Last-mile access, Multipath routing protocols, Security, Smart grid, Wireless mesh network

Binod Vaidya; Dimitrios Makrakis; Hussein Mouftah

2013-11-01T23:59:59.000Z

334

ParkingMeter: Balancing Energy Savings and Service Availability  

E-Print Network (OSTI)

ParkingMeter: Balancing Energy Savings and Service Availability Riccardo Crepaldi University of Illinois at Urbana Champaign rcrepal2@illinois.edu Ryan Welsh University of Illinois at Urbana Champaign rjwelsh2@illinois.edu Robin H. Kravets University of Illinois at Urbana Champaign rhk@illinois

Kravets, Robin

335

Hydrostatic bearings for a turbine fluid flow metering device  

DOE Patents (OSTI)

A rotor assembly fluid metering device has been improved by development of a hydrostatic bearing fluid system which provides bearing fluid at a common pressure to rotor assembly bearing surfaces. The bearing fluid distribution system produces a uniform film of fluid between bearing surfaces and allows rapid replacement of bearing fluid between bearing surfaces, thereby minimizing bearing wear and corrosion. 3 figs.

Fincke, J.R.

1982-05-04T23:59:59.000Z

336

Personal energy metering Simon Hay, Andrew Rice and Andy Hopper  

E-Print Network (OSTI)

based on energy and usage data collected over the course of a year. We also studied the addi- tionalPersonal energy metering Simon Hay, Andrew Rice and Andy Hopper {sjeh3,acr31,ah12}@cam.ac.uk Computer Laboratory, University of Cambridge 1 Introduction Every day each of us consumes a significant

Cambridge, University of

337

Commercial building end-use energy metering inventory  

SciTech Connect

Pacific Northwest Laboratory conducted a comprehensive inventory of end-use metered data. The inventory did not discover many sources of metered end-use data; however, research into existing data bases and extensive discussions with professionals associated with building energy conservation have enabled a clear characterization to be developed of the types of metered data that are required to further energy conservation in commercial buildings. Based on the results of the inventory and this clarification of data requirements, the adequacy of existing data bases has been assessed, and recommendations have been developed for future federal data collection efforts. A summary of sources of existing metered end-use data is provided in Section 2.1 and its adequacy has been summarized. Collection of further end-use metered data is both desirable and valuable for many areas of building energy conservation research. Empirical data are needed to address many issues which to date have been addressed using only simulation techniques. The adequacy of using simulation techniques for various purposes needs to be assessed through comparison with measured data. While these data are expensive to acquire, it is cost-effective to do so in the long run, and the need is not being served by the private market. The preceding conclusion based on results from the inventory of existing data highlights two important facts: First, although the data are widely desired in the private sector, they are not widely available. Second, where suitable data are publicly available and contain the desired supporting information, their collection has generally been funded by government-sponsored research.

Heidell, J.A.; Mazzucchi, R.P.; Reilly, R.W.

1985-03-01T23:59:59.000Z

338

Deployment of Behind-The-Meter Energy Storage for Demand Charge Reduction  

SciTech Connect

This study investigates how economically motivated customers will use energy storage for demand charge reduction, as well as how this changes in the presence of on-site photovoltaic power generation, to investigate the possible effects of incentivizing increased quantities of behind-the-meter storage. It finds that small, short-duration batteries are most cost effective regardless of solar power levels, serving to reduce short load spikes on the order of 2.5% of peak demand. While profitable to the customer, such action is unlikely to adequately benefit the utility as may be desired, thus highlighting the need for modified utility rate structures or properly structured incentives.

Neubauer, J.; Simpson, M.

2015-01-01T23:59:59.000Z

339

"YEAR","MONTH","STATE","UTILITY CODE","UTILITY NAME","RESIDENTIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","TOTAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","COMMERCIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","INDUSTRIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","TRANSPORTATION PHOTOVOLTAIC NET METERING CUSTOMER COUNT","TOTAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","RESIDENTIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION WIND ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL WIND INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL WIND INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL WIND INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION WIND INSTALLED NET METERING CAPACITY (MW)","TOTAL WIND INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL WIND NET METERING CUSTOMER COUNT","COMMERCIAL WIND NET METERING CUSTOMER COUNT","INDUSTRIAL WIND NET METERING CUSTOMER COUNT","TRANSPORTATION WIND NET METERING CUSTOMER COUNT","TOTAL WIND NET METERING CUSTOMER COUNT","RESIDENTIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL OTHER INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL OTHER INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL OTHER INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION OTHER INSTALLED NET METERING CAPACITY (MW)","TOTAL OTHER INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL OTHER NET METERING CUSTOMER COUNT","COMMERCIAL OTHER NET METERING CUSTOMER COUNT","INDUSTRIAL OTHER NET METERING CUSTOMER COUNT","TRANSPORTATION OTHER NET METERING CUSTOMER COUNT","TOTAL OTHER NET METERING CUSTOMER COUNT","RESIDENTIAL TOTAL ENERGY SOLD BACK TO THE UTILITY (MWh)","COMMERCIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION TOTAL INSTALLED NET METERING CAPACITY (MW)","TOTAL INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL TOTAL NET METERING CUSTOMER COUNT","COMMERCIAL TOTAL NET METERING CUSTOMER COUNT","INDUSTRIAL TOTAL NET METERING CUSTOMER COUNT","TRANSPORTATION TOTAL NET METERING CUSTOMER COUNT","TOTAL NET METERING CUSTOMER COUNT","RESIDENTIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","COMMERCIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","INDUSTRIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TRANSPORTATION ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TOTAL ELECTRIC ENERGY SOLD BACK TO THE UTILITYFOR ALL STATES SERVED(MWh)","RESIDENTIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","COMMERCIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INDUSTRIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","TRANSPORTATION INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","RESIDENTIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","COMMERCIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","INDUSTRIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","TRANSPORTATION NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","NET METERING CUSTOMER COUNT FOR ALL STATES SERVED"  

U.S. Energy Information Administration (EIA) Indexed Site

UTILITYFOR ALL STATES SERVED(MWh)","RESIDENTIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","COMMERCIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INDUSTRIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","TRANSPORTATION INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","RESIDENTIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","COMMERCIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","INDUSTRIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","TRANSPORTATION NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","NET METERING CUSTOMER COUNT FOR ALL STATES SERVED"

340

"YEAR","MONTH","STATE","UTILITY CODE","UTILITY NAME","RESIDENTIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","TOTAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","COMMERCIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","INDUSTRIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","TRANSPORTATION PHOTOVOLTAIC NET METERING CUSTOMER COUNT","TOTAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","RESIDENTIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION WIND ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL WIND INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL WIND INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL WIND INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION WIND INSTALLED NET METERING CAPACITY (MW)","TOTAL WIND INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL WIND NET METERING CUSTOMER COUNT","COMMERCIAL WIND NET METERING CUSTOMER COUNT","INDUSTRIAL WIND NET METERING CUSTOMER COUNT","TRANSPORTATION WIND NET METERING CUSTOMER COUNT","TOTAL WIND NET METERING CUSTOMER COUNT","RESIDENTIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL OTHER INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL OTHER INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL OTHER INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION OTHER INSTALLED NET METERING CAPACITY (MW)","TOTAL OTHER INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL OTHER NET METERING CUSTOMER COUNT","COMMERCIAL OTHER NET METERING CUSTOMER COUNT","INDUSTRIAL OTHER NET METERING CUSTOMER COUNT","TRANSPORTATION OTHER NET METERING CUSTOMER COUNT","TOTAL OTHER NET METERING CUSTOMER COUNT","RESIDENTIAL TOTAL ENERGY SOLD BACK TO THE UTILITY (MWh)","COMMERCIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION TOTAL INSTALLED NET METERING CAPACITY (MW)","TOTAL INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL TOTAL NET METERING CUSTOMER COUNT","COMMERCIAL TOTAL NET METERING CUSTOMER COUNT","INDUSTRIAL TOTAL NET METERING CUSTOMER COUNT","TRANSPORTATION TOTAL NET METERING CUSTOMER COUNT","TOTAL NET METERING CUSTOMER COUNT","RESIDENTIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","COMMERCIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","INDUSTRIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TRANSPORTATION ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TOTAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","RESIDENTIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","COMMERCIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INDUSTRIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","TRANSPORTATION INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","RESIDENTIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","COMMERCIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","INDUSTRIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","TRANSPORTATION NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","NET METERING CUSTOMER COUNT FOR ALL STATES SERVED"  

U.S. Energy Information Administration (EIA) Indexed Site

UTILITY FOR ALL STATES SERVED(MWh)","RESIDENTIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","COMMERCIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INDUSTRIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","TRANSPORTATION INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","RESIDENTIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","COMMERCIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","INDUSTRIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","TRANSPORTATION NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","NET METERING CUSTOMER COUNT FOR ALL STATES SERVED"

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Substation grounding optimization.  

E-Print Network (OSTI)

??Substation grounding is a critical part of the overall electric power system. It is designed to not only provide a path to dissipate electric currents (more)

Balev, Vadim

2014-01-01T23:59:59.000Z

342

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 3, is a users manual and an installation and validation manual for the computer program SGSYS (Substation Grounding SYStem Analysis Program). This program analyzes the substation ground field given the total electric current injected into the ground field and the design of the grounding system. Standard outputs of the program are (1) total ground resistance, (2) step voltage, (3) touch voltage, (4) voltages on a grid of points, (5) voltage profile along straight lines, (6) transfer voltages, (7) ground potential rise, (8) body currents, (9) step voltage profile along straight lines, and (10) touch voltage profile along straight lines. This program can be utilized in an interactive or batch mode. In the interactive mode, the user defines the grounding system geometry, soil parameters, and output requests interactively, with the use of a user friendly conversational program. The users manual describes data requirements and data preparation procedures. An appendix provides forms which facilitate data collection procedures. The installation and validation manual describes the computer files which make up the program SGSYS and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

343

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. It can be used to compute transient ground potential rise due to lightning or switching, and the ground impedance (i.e. resistance and reactance) at specified frequencies. This report, Volume 4, is a users manual and an installation and validation manual for the computer program TGRND (Transient GRouNDing System Analysis Program). This program computes transient ground potential rise resulting from lightning, switching, or other transient electric currents injected to a grounding system. The program also computes the impedance (i.e. resistance and reactance) of a grounding system as a function of frequency. This program can be utilized in an interactive or batch mode. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program TGRND and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

344

ESB Smart Meter Projects (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

ESB Smart Meter Projects ESB Smart Meter Projects Country Ireland Headquarters Location Cork, Ireland Coordinates 51.897873°, -8.471087° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.897873,"lon":-8.471087,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

345

Dead-time compensation for a logarithmic display rate meter  

DOE Patents (OSTI)

An improved circuit is provided for application to a radiation survey meter that uses a detector that is subject to dead time. The circuit compensates for dead time over a wide range of count rates by producing a dead-time pulse for each detected event, a live-time pulse that spans the interval between dead-time pulses, and circuits that average the value of these pulses over time. The logarithm of each of these values is obtained and the logarithms are subtracted to provide a signal that is proportional to a count rate that is corrected for the effects of dead time. The circuit produces a meter indication and is also capable of producing an audible indication of detected events.

Larson, John A. (Aurora, IL); Krueger, Frederick P. (Aurora, IL)

1988-09-20T23:59:59.000Z

346

Clustering of Meter-wave Luminous Objects toward Monoceros  

E-Print Network (OSTI)

A distribution of the meter-wave luminous objects, which are bright at frequency 74 MHz (a wavelength of 4 m) but not detectable at 1.4 GHz (21 cm) in the VLA surveys, shows a notable concentration in a scale of a few degrees toward Monoceros [(l, b)=(225, 4)]. We argue that it is a part of giant radio relics associated with a nearby cluster of galaxies with cz~2400$ km s^{-1} centered on the spiral galaxy NGC 2377. The angular separation of these objects from the clustering center is consistent with the separation of distant relics to the cluster center if scaled by distance. This fact implies that the concentrations of meter-wave luminous objects can be used as a tracer of the structure of the Local Supercluster and it's vicinity.

Shuji Deguchi; Kazutaka Koike

2008-11-19T23:59:59.000Z

347

Dead-time compensation for a logarithmic display rate meter  

DOE Patents (OSTI)

An improved circuit is provided for application to a radiation survey meter that uses a detector that is subject to dead time. The circuit compensates for dead time over a wide range of count rates by producing a dead-time pulse for each detected event, a live-time pulse that spans the interval between dead-time pulses, and circuits that average the value of these pulses over time. The logarithm of each of these values is obtained and the logarithms are subtracted to provide a signal that is proportional to a count rate that is corrected for the effects of dead time. The circuit produces a meter indication and is also capable of producing an audible indication of detected events. 5 figs.

Larson, J.A.; Krueger, F.P.

1987-10-05T23:59:59.000Z

348

Hydrostatic bearings for a turbine fluid flow metering device  

DOE Patents (OSTI)

A rotor assembly fluid metering device has been improved by development of a hydrostatic bearing fluid system which provides bearing fluid at a common pressure to rotor assembly bearing surfaces. The bearing fluid distribution system produces a uniform film of fluid distribution system produces a uniform film of fluid between bearing surfaces and allows rapid replacement of bearing fluid between bearing surfaces, thereby minimizing bearing wear and corrosion.

Fincke, J.R.

1980-05-02T23:59:59.000Z

349

Ground Motion Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

2nd Advanced ICFA Beam Dynamics Workshop 2nd Advanced ICFA Beam Dynamics Workshop on Ground Motion in Future Accelerators November 6 - 9, 2000 SLAC Coordinators: Andrei Seryi & Tor Raubenheimer Proceedings Updated June 26, 2001 Agenda and Presentations Workshop photos Summaries Useful links Poster Goals Introduction to the problems Structure Registration Registered participants Committees Location, Accommodations and Travel Workshop on Ground Motion in Future Accelerators A workshop was held at SLAC that was devoted to ground motion and its effects on future accelerators. Ground motion and vibration can be a limiting effect in synchrotron light sources, hadron circular colliders, and electron/positron linear colliders. Over the last several years, there has been significant progress in the understanding of the ground motion and its effects, however, there are

350

Microsoft Word - eMeter 10-11-01 Response to DOE RFI.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Addressing Policy and Logistical Challenges to smart grid Implementation: Addressing Policy and Logistical Challenges to smart grid Implementation: Response to Department of Energy RFI November 1, 2010 eMeter Strategic Consulting Background eMeter is a smart grid software company that provides smart network application platform (SNAP) software to integrate smart meters and smart grid communications networks and devices with utility IT systems. eMeter also provides smart grid application software such as meter data management (MDM) and consumer engagement software. Being vendor-neutral toward all meter, hardware, and legacy utility software systems (e.g. CIS and Billing), eMeter has a unique, unbiased and global perspective on smart grid IT issues. In addition, eMeter's principals have participated in the definition and development of the

351

The Economic Value of PV and Net Metering to Residential Customers in California  

E-Print Network (OSTI)

metering than with a feed-in tariff where all PV generationnet metering, MPR- based feed-in tariff, hourly netting, and1) An MPR-based feed-in tariff, under which the customer is

Darghouth, Naim

2010-01-01T23:59:59.000Z

352

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert Block  

E-Print Network (OSTI)

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert of the detectors was chosen to take advantage of the neutron beam geometry at the detector location, 100 meters

Danon, Yaron

353

WINDExchange: Utility-Scale Land-Based 80-Meter Wind Maps  

Wind Powering America (EERE)

Programs & Data Utility-Scale Land-Based 80-Meter Wind Maps The U.S. Department of Energy provides an 80-meter (m) height, high-resolution wind resource map for the United...

354

Why Is the Speed of Light in Meters Per Second What It Is? |...  

NLE Websites -- All DOE Office Websites (Extended Search)

Invention > Stump the Scientist > Why Is the Speed of Light in Meters Per Second What It Is? Why Is the Speed of Light in Meters Per Second What It Is? 2012.08.27 Chief Scientist...

355

Transportation and Electricity Convergence Session 2: National Lab Perspective (Sub-metering Hardware and Protocols)  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation and Electricity Convergence Session 2: National Lab Perspective (Sub-metering Hardware and Protocols) 1912 2012 Theodore Bohn Argonne National Laboratory 4 th Annual Workshop Evs- Transportation and Electricity Convergence Houston, TX Nov 2, 2011 ANL Perspective: Standards are the common thread that enables interoperability of new technologies Detroit was the first American city to use electric taxi cabs, in 1914. Are Indoor/Outdoor Charge Ports New? Detroit's first electric taxi accumulated >46,000 miles first two years. 2 Outdoor Curb-Side Charging Port Indoor charging stations 3 Charging Levels/ Recharge Times (it depends)  AC Level 1 - 120 v/20A outlet (~1600W) - In most garages - Outlet capacity? - Dedicated outlet usually required

356

Effects of geometric scaling on static pressure measurements in orifice flow-meters  

E-Print Network (OSTI)

. (Mech) University of Mysore, India Chair of Advisory Committee: Dr. G. L. Morrison It is estimated that there are over one million orifice meters in operation today in the United States of America. . The accuracy of these meters.... It is estimated that there are over one million orifice meters in operation today in the United States of America. The accuracy of these meters is such that uncertainties of millions of dollars a year result from their use [1]. The basic idea employed...

Sarker, Arunava

2012-06-07T23:59:59.000Z

357

Video game console usage and national energy consumption: Results from a field-metering study  

E-Print Network (OSTI)

with their free energy audit program. Meters were installedinstalled as part of an energy audit program. Users may be

Desroches, Louis-Benoit

2013-01-01T23:59:59.000Z

358

1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. HIGH-ACCURACY LASER POWER AND ENERGY METER CALIBRATION SYSTEM . . . . . . . . 2  

E-Print Network (OSTI)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. HIGH-ACCURACY LASER POWER AND ENERGY METER CALIBRATION SYSTEM . . . . . . . . 2 2.1 Calibration

359

Status of Net Metering: Assessing the Potential to Reach Program Caps (Poster)  

SciTech Connect

Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.

Heeter, J.; Bird, L.; Gelman, R.

2014-10-01T23:59:59.000Z

360

Status of Net Metering: Assessing the Potential to Reach Program Caps  

SciTech Connect

Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.

Heeter, J.; Gelman, R.; Bird, L.

2014-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

United States- Land Based and Offshore Annual Average Wind Speed at 100 Meters  

Energy.gov (U.S. Department of Energy (DOE))

Full-size, high resolution version of the 100-meter land-based and offshore wind speed resource map.

362

Meter as Mechanism: A Neural Network that Learns Metrical Michael Gasser, Douglas Eck and Robert Port  

E-Print Network (OSTI)

Meter as Mechanism: A Neural Network that Learns Metrical Patterns Michael Gasser, Douglas Eck that apparently underlies both music and some examples of speech production is meter. Yet detailed measurements of pulses that conform to particular meters. In addition, beginning with an initial state with no biases

Gasser, Michael

363

Feeling Music: Integration of Auditory and Tactile Inputs in Musical Meter Perception  

E-Print Network (OSTI)

Feeling Music: Integration of Auditory and Tactile Inputs in Musical Meter Perception Juan Huang1 are integrated in humans performing a musical meter recognition task. Subjects discriminated between two types coherent meter percepts, and 3) Simultaneously presented bimodal inputs where the two channels contained

Wang, Xiaoqin

364

Detecting Meter in Recorded Music Joseph E. Flannick, Rachel W. Hall, and Robert Kelly  

E-Print Network (OSTI)

Detecting Meter in Recorded Music Joseph E. Flannick, Rachel W. Hall, and Robert Kelly Dept) to identify the primary rhythmic content of pieces of popular music. The meter of such pieces is deter- mined of energy bursts in each band. We found that the meters of the pieces we analyzed were characterized

Hall, Rachel W.

365

Broadband precision wavelength meter based on a stepping FabryProt interferometer  

E-Print Network (OSTI)

Broadband precision wavelength meter based on a stepping Fabry­Pérot interferometer T. J. Scholl. INTRODUCTION Wavelength meters based on Michelson or Fizeau inter- ferometers have long been the standard a more general laser wavelength meter in which the FP ring pattern was employed to compare

Rehse, Steven J.

366

Meter Any Wire, Anywhere by Virtualizing the Voltage Channel Thomas Schmid, David Culler, Prabal Dutta  

E-Print Network (OSTI)

Meter Any Wire, Anywhere by Virtualizing the Voltage Channel Thomas Schmid, David Culler, Prabal}@eecs.umich.edu culler@cs.berkeley.edu Abstract AC power meters require both voltage and current to be sampled physical proximity and fed into a single power metering de- vice. In this paper, we explore the viability

Dutta, Prabal

367

Behavioral/Systems/Cognitive Selective Neuronal Entrainment to the Beat and Meter  

E-Print Network (OSTI)

Behavioral/Systems/Cognitive Selective Neuronal Entrainment to the Beat and Meter Embedded Fundamental to the experience of music, beat and meter perception refers to the perception of periodicities the spontaneous building of beat and meter hypothesized to emerge from the selective entrainment of neuronal

368

RIS-M-2243 THE RADIOCHROMIC DYE FILM DOSE METER AS A POSSIBLE TEST OF PARTICLE  

E-Print Network (OSTI)

RIS?-M-2243 THE RADIOCHROMIC DYE FILM DOSE METER AS A POSSIBLE TEST OF PARTICLE TRACK THEORY Johnny-film radlochromlc dye cyanide plastic dose meter to Ionizing radiation of electrons and heavy charged particles - 1. INTRODUCTION The radiochromic dye cyanide film dose meter has been investigated as a pos- sible

369

TRACKING THE "ODD": METER INFERENCE IN A CULTURALLY DIVERSE MUSIC CORPUS  

E-Print Network (OSTI)

TRACKING THE "ODD": METER INFERENCE IN A CULTURALLY DIVERSE MUSIC CORPUS Andre Holzapfel New York, containing a variety of meter types. We demonstrate that by adapting the model to specific styles, we can track beats and down- beats in odd meter types like 9/8 or 7/8 with an accuracy significantly improved

370

C-Meter: A Framework for Performance Analysis of Computing Clouds  

E-Print Network (OSTI)

C-Meter: A Framework for Performance Analysis of Computing Clouds Nezih Yigitbasi, Alexandru Iosup virtualization and network communications overheads. To address these issues, we have designed and implemented C-Meter of computing clouds. Then, we present the architecture of the C-Meter framework and discuss several resource

Iosup, Alexandru

371

Infants Prefer the Musical Meter of Their Own Culture: A Cross-Cultural Comparison  

E-Print Network (OSTI)

Infants Prefer the Musical Meter of Their Own Culture: A Cross-Cultural Comparison Gaye Soley to determine whether cultural background would influence their preferences for musical meter. In Experiment 1, American infants preferred Western over Balkan meter, whereas Turkish infants, who were familiar with both

Ahmad, Sajjad

372

DESIGN OF INTELLIGENT CONDUCTIVITY METER BASED ON MSP430F149  

E-Print Network (OSTI)

DESIGN OF INTELLIGENT CONDUCTIVITY METER BASED ON MSP430F149 Yaoguang Wei, Jianqing Wang, Daoliang are agriculture information technology. dliangl@cau.edu.cn Abstract: An intelligent conductivity meter based on MSP430F149 microcontroller was proposed in this paper. The intelligent conductive meter was composed

373

Finding Meter in Music Using an Autocorrelation Phase Matrix and Shannon Douglas Eck  

E-Print Network (OSTI)

Finding Meter in Music Using an Autocorrelation Phase Matrix and Shannon Entropy Douglas Eck. This approach yields a good model for predicting the meter of a piece of music. Finally we can use the phase information in the matrix to align a can- didate meter with music, making it possible to perform beat

Eck, Doug

374

meters in CO2 euthanasia chambers. All CO2 euthanasia chambers in both  

E-Print Network (OSTI)

meters in CO2 euthanasia chambers. All CO2 euthanasia chambers in both the facilities and laboratories will need flow meters. ULAR is currently in the process of identifying a cost-effective, accurate, and durable flow meter to install in all of the CO2 chambers in all of the vivaria. When a specific model

Bushman, Frederic

375

A Scalable Soft Spot Analysis Methodology for Compound Noise Effects in Nano-meter Circuits  

E-Print Network (OSTI)

A Scalable Soft Spot Analysis Methodology for Compound Noise Effects in Nano-meter Circuits Chong@ece.ucsd.edu ABSTRACT Circuits using nano-meter technologies are becoming increasingly vulnerable to signal interference methodology to study the vulnerability of digital ICs exposed to nano-meter noise and transient soft errors

California at San Diego, University of

376

Principle and implementations of a refracto-nephelo-turbidi-meter for  

E-Print Network (OSTI)

1 Principle and implementations of a refracto-nephelo-turbidi-meter for seawater measurements B of physical oceanography requires a compact high-resolution in-situ salino-turbidi-meter to measure these two the requirements and challenges of refracto-turbidi-meter design from their measurement principles and correlations

Paris-Sud XI, Université de

377

Design study of 8 meter monolithic mirror UV/optical space telescope H. Philip Stahl  

E-Print Network (OSTI)

Design study of 8 meter monolithic mirror UV/optical space telescope H. Philip Stahl NASA Marshall Space Flight Center, Huntsville, AL 35812 ABSTRACT The planned Ares V launch vehicle with its 10 meter to 8 meter class monolithic primary mirror telescope to Sun-Earth L2 using an Ares V. Specific

Sirianni, Marco

378

Behavioral/Systems/Cognitive Tagging the Neuronal Entrainment to Beat and Meter  

E-Print Network (OSTI)

Behavioral/Systems/Cognitive Tagging the Neuronal Entrainment to Beat and Meter Sylvie Nozaradan,1 (BRAMS), Universite´ de Montre´al, Quebec C.P. 6128 H3C 3J7, Canada Feeling the beat and meter to the beat frequency. Most importantly, we found that meter imagery elicits an additional frequency tuned

379

A model of the VU (volume-unit) meter, with speech applications Bryce Lobdell  

E-Print Network (OSTI)

A model of the VU (volume-unit) meter, with speech applications Bryce Lobdell Jont Allen Beckman Institute, University of Illinois Urbana, IL 61801 (October 11, 2006) Running title: volume unit meter usage ABSTRACT The Volume Unit (VU) meter, used in speech research prior to the ad- vent of computers and modern

Allen, Jont

380

Gemini: A Non-Invasive, Energy-Harvesting True Power Meter Bradford Campbell and Prabal Dutta  

E-Print Network (OSTI)

Gemini: A Non-Invasive, Energy-Harvesting True Power Meter Bradford Campbell and Prabal Dutta,prabal}@umich.edu Abstract--Power meters are critical for submetering loads in residential and commercial settings, but high by proposing non-invasive meters that easily clip onto a wire, or stick onto a circuit breaker, to perform

Dutta, Prabal

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 2, is a users manual and an installation and validation manual for the computer program SMECC (Substation Maximum Earth Current Computation Program). This program analyzes the electric current distribution among grounded structures inside and outside a substation for different fault conditions. The fault conditions are automatically selected by the program, or they may be specified by the user, or both. The fault condition resulting in maximum substation earth current is identified and reported. Data requirements for this program are: ground impedance, transformer data, transmission line data, transmission line grounding impedances, etc. The program provides four types of standard outputs: (1) a report of voltages and current flow in the unfaulted system, (2) a brief report of the maximum ground potential rise (worst fault condition), (3) a summary report of all fault conditions which have been analyzed by the program, and (4) a detailed report of voltages and current flow for a selected set of fault conditions.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

382

MSET modeling of Crystal River-3 venturi flow meters.  

SciTech Connect

The analysis of archived Crystal River-3 feedwater flow data reveals a slow and steady degradation of the flow meter measurements during the 1992/1993 operating cycle. MSET can reliably estimate the true flow rate and quantify the degree of departure between the indicated signal and the true flow rate with high accuracy. The MSET computed flow rate could, in principle, be used to provide an improved estimate of the reactor power and hence avoid the revenue loss associated with derating the reactor based on a faulty feedwater flow rate indication.

Bockhorst, F. K.; Gross, K. C.; Herzog, J. P.; Wegerich, S. W.

1998-01-05T23:59:59.000Z

383

The Coldest Cubic Meter in the Known Universe  

E-Print Network (OSTI)

CUORE is a 741 kg array of TeO2 bolometers that will search for the neutrinoless double beta decay of 130Te. The detector is being constructed at the Laboratori Nazionali del Gran Sasso in Italy, where it will begin taking data in 2015. The CUORE cryostat will cool several metric tonnes of material to below 1 K and the CUORE detector itself will operate at a typical temperature of 10 mK. At this temperature, the CUORE detector will be the coldest contiguous cubic meter in the known Universe.

Jonathan Ouellet

2014-10-14T23:59:59.000Z

384

The Coldest Cubic Meter in the Known Universe  

E-Print Network (OSTI)

CUORE is a 741 kg array of TeO2 bolometers that will search for the neutrinoless double beta decay of 130Te. The detector is being constructed at the Laboratori Nazionali del Gran Sasso in Italy, where it will begin taking data in 2015. The CUORE cryostat will cool several metric tonnes of material to below 1 K and the CUORE detector itself will operate at a typical temperature of 10 mK. At this temperature, the CUORE detector will be the coldest contiguous cubic meter in the known Universe.

Ouellet, Jonathan

2014-01-01T23:59:59.000Z

385

2010 Assessment of Demand Response and Advanced Metering - Staff Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 Assessment of Demand Response and Advanced Metering Staff Report Federal Energy Regulatory Commission February 2011 The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. ACKNOWLEDGEMENTS Federal Energy Regulatory Commission Staff Team Dean Wight, Team Lead Caroline Daly David Kathan Michael P. Lee Kamaria Martin Pamela Silberstein Michael Tita Rebecca Vertes Z, INC. Team Bryan Templeton (Z, INC.) Valerie Richardson (KEMA) Will Gifford (KEMA) Christopher Elsner (Z, INC.) Matthew S. Pettit (KEMA) Geoff Barker (KEMA) Ron Chebra (KEMA) TABLE OF CONTENTS Executive Summary

386

Advanced array techniques for unattended ground sensor applications  

SciTech Connect

Sensor arrays offer opportunities to beam form, and time-frequency analyses offer additional insights to the wavefield data. Data collected while monitoring three different sources with unattended ground sensors in a 16-element, small-aperture (approximately 5 meters) geophone array are used as examples of model-based seismic signal processing on actual geophone array data. The three sources monitored were: (Source 01). A frequency-modulated chirp of an electromechanical shaker mounted on the floor of an underground bunker. Three 60-second time-windows corresponding to (a) 50 Hz to 55 Hz sweep, (b) 60 Hz to 70 Hz sweep, and (c) 80 Hz to 90 Hz sweep. (Source 02). A single transient impact of a hammer striking the floor of the bunker. Twenty seconds of data (with the transient event approximately mid-point in the time window.(Source 11)). The transient event of a diesel generator turning on, including a few seconds before the turn-on time and a few seconds after the generator reaches steady-state conditions. The high-frequency seismic array was positioned at the surface of the ground at a distance of 150 meters (North) of the underground bunker. Four Y-shaped subarrays (each with 2-meter apertures) in a Y-shaped pattern (with a 6-meter aperture) using a total of 16 3-component, high-frequency geophones were deployed. These 48 channels of seismic data were recorded at 6000 and 12000 samples per second on 16-bit data loggers. Representative examples of the data and analyses illustrate the results of this experiment.

Followill, F.E.; Wolford, J.K.; Candy, J.V.

1997-05-06T23:59:59.000Z

387

The magnetic flywheel flow meter: Theoretical and experimental contributions  

SciTech Connect

The development of contactless flow meters is an important issue for monitoring and controlling of processes in different application fields, like metallurgy, liquid metal casting, or cooling systems for nuclear reactors and transmutation machines. Shercliff described in his book The Theory of Electromagnetic Flow Measurement, Cambridge University Press, 1962 a simple and robust device for contact-less measurements of liquid metal flow rates which is known as magnetic flywheel. The sensor consists of several permanent magnets attached on a rotatable soft iron plate. This arrangement will be placed closely to the liquid metal flow to be measured, so that the field of the permanent magnets penetrates into the fluid volume. The flywheel will be accelerated by a Lorentz force arising from the interaction between the magnetic field and the moving liquid. Steady rotation rates of the flywheel can be taken as a measure for the mean flow rate inside the fluid channel. The present paper provides a detailed theoretical description of the sensor in order to gain a better insight into the functional principle of the magnetic flywheel. Theoretical predictions are confirmed by corresponding laboratory experiments. For that purpose, a laboratory model of such a flow meter was built and tested on a GaInSn-loop under various test conditions.

Buchenau, D., E-mail: d.buchenau@hzdr.de; Galindo, V.; Eckert, S. [Helmholtz-Zentrum Dresden-Rossendorf, Institute of Fluid Dynamics, Bautzner Landstrae 400, 01328 Dresden (Germany)

2014-06-02T23:59:59.000Z

388

Meter scale plasma source for plasma wakefield experiments  

SciTech Connect

High accelerating gradients generated by a high density electron beam moving through plasma has been used to double the energy of the SLAC electron beam [1]. During that experiment, the electron current density was high enough to generate its own plasma without significant head erosion. In the newly commissioned FACET facility at SLAC, the peak current will be lower and without pre-ionization, head erosion will be a significant challenge for the planned experiments. In this work we report on our design of a meter scale plasma source for these experiments to effectively avoid the problem of head erosion. The plasma source is based on a homogeneous metal vapor gas column that is generated in a heat pipe oven [2]. A lithium oven over 30 cm long at densities over 10{sup 17} cm{sup -3} has been constructed and tested at UCLA. The plasma is then generated by coupling a 10 TW short pulse Ti:Sapphire laser into the gas column using an axicon lens setup. The Bessel profile of the axicon setup creates a region of high intensity that can stretch over the full length of the gas column with approximately constant diameter. In this region of high intensity, the alkali metal vapor is ionized through multi-photon ionization process. In this manner, a fully ionized meter scale plasma of uniform density can be formed. Methods for controlling the plasma diameter and length will also be discussed.

Vafaei-Najafabadi, N.; Shaw, J. L.; Marsh, K. A.; Joshi, C.; Hogan, M. J. [Department of Electrical Engineering, University of California Los Angeles, Los Angeles, CA 90095 (United States); SLAC National Accelerator Laboratory, Menlo Park, CA 94025 (United States)

2012-12-21T23:59:59.000Z

389

Microsoft Word - CX-OTEC-West-JohnDaySub-MeterProjectFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walker Miller Walker Miller Electrical Engineer - TPCF-PASCO Proposed Action: Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation PP&A Project No: 2595 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an old JEM1 revenue meter at OTEC's West John Day Substation. The meter would be replaced with a new JEMStar meter inside OTEC's existing control house. The new meter would allow BPA to meter load from a new transformer OTEC is installing. This meter will be installed by BPA personnel and it will remain the property and responsibility of BPA.

390

California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors  

E-Print Network (OSTI)

1 California Solar Initiative (CSI) Thermal Program Metering Installation Guide Purpose: The purpose of this metering installation guide is to provide participating eligible contractors in the CSI-Thermal to the mixing valve. Place the hot sensor on the pipe between the solar tank and the backup water heater. #12

391

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

net metering, and policies for supporting solar deployment.net metering, and policies for supporting solar deployment.Energy Policy, 36: MRW & Associates. 2007. Solar PV and

Darghouth, Naim

2010-01-01T23:59:59.000Z

392

Substation grounding programs  

SciTech Connect

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

393

An Ultrasonic Meter to Characterize Degree of Fouling and Cleaning in Reverse Osmosis Filters  

Science Journals Connector (OSTI)

The development of prognostic capabilities that predict the condition and remaining service life for key industrial systems has the potential to significantly impact performance and the economics of operation for both current and next generation plants. This paper describes an on?line real?time ultrasonic meter that can be used to monitor both fouling and cleaning in reverse osmosis filters. It provides a measure for the degree of fouling. A suit of ultrasonic transducers is mounted to operate through the filter?housing wall on a pilot?scale service water system. A Degree of Fouling index is given during both fouling and cleaning for the filters during operation for processing of saline solutions (simulated sea and brackish waters) and solids contamination. The fouling index is transmitted to a central computer where it is integrated in a system level prognostic algorithm.

M. Morra; L. J. Bond; G. R. Golcar

2003-01-01T23:59:59.000Z

394

Trillion Cubic Feet Billion Cubic Meters Residential Commercial  

Gasoline and Diesel Fuel Update (EIA)

2 2 4 6 8 10 0 50 100 150 200 250 Trillion Cubic Feet Billion Cubic Meters Residential Commercial Industrial Electric Utilities 1930 1935 1940 1945 1950 1955 1960 1965 1970 1980 1985 1990 1995 1975 2000 Note: In 1996, consumption of natural gas for agricultural use is classified as industrial use. In 1995 and earlier years, agricultural use was classified as commercial use. Sources: 1930-1975: Bureau of Mines, Minerals Yearbook, "Natural Gas" chapter. 1976-1978: Energy Information Administration (EIA), Energy Data Reports, Natural Gas Annual. 1979: EIA, Natural Gas Production and Consumption, 1979. 1980-1996: Form EIA- 176, "Annual Report of Natural and Supplemental Gas Supply and Disposition" and Form EIA-759, "Monthly Power Plant Report." 23. Natural Gas Delivered to Consumers in the United States, 1930-1996 Figure

395

ESB Smart Meter Projects (Smart Grid Project) (Limerick, Ireland) | Open  

Open Energy Info (EERE)

Projects (Smart Grid Project) (Limerick, Ireland) Projects (Smart Grid Project) (Limerick, Ireland) Jump to: navigation, search Project Name ESB Smart Meter Projects Country Ireland Headquarters Location Limerick, Ireland Coordinates 52.663857°, -8.626773° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.663857,"lon":-8.626773,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

396

Microsoft Word - CX-Paisley_Meter_08Aug2013.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Robert Trismen Project Manager -TEP-CSB-1 Proposed Action: Paisley Geothermal Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Lake County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate Surprise Valley Electrification Corporation's (SVEC) 3.65-megawatt Paisley Geothermal Project into BPA's balancing authority (BA) in response to a SVEC small generator interconnection request. The proposed point of interconnection would be at SVEC's existing Paisley Substation. In order to integrate the proposed geothermal generation project, BPA would provide and review metering drawings,

397

Positron Beam Propagation in a Meter Long Plasma Channel  

SciTech Connect

Recent experiments and simulations have shown that positron beams propagating in plasmas can be focused and also create wakes with large accelerating gradients. For similar parameters, the wakes driven by positron beams are somewhat smaller compared to the case of an electron beam. Simulations have shown that the wake amplitude can be increased if the positron beam is propagated in a hollow plasma channel (Ref. 1). This paper, compares experimentally, the propagation and beam dynamics of a positron beam in a meter scale homogeneous plasma, to a positron beam hollow channel plasma. The results show that positron beams in hollow channels are less prone to distortions and deflections. Hollow channels were observed to guide the positron beam onto the channel axis. Beam energy loss was also observed implying the formation of a large wake amplitude. The experiments were carried out as part of the E-162 plasma wakefield experiments at SLAC.

Marsh, K.A.; Blue, B.E.; Clayton, C.E.; Joshi, C.; Mori, W.B.; /UCLA; Decker, F.-J.; Hogan, M.J.; Iverson, R.; O'Connell, C.; Raimondi, P.; Siemann, Robert H.; Walz, D.; /SLAC; Katsouleas, T.C.; Muggli, P.; /Southern California U.

2008-03-17T23:59:59.000Z

398

Quantum Metrology: Towards an alternative definition for the meter  

E-Print Network (OSTI)

The motivation for this article came from an attempt to give an alternative definition for the meter, the SI unit for measuring length. As a starting point towards this goal, in this piece of work we present the underlying theory behind our approach which uses ideas from quantum field theory and noncommutative geometry, in particular the notion of an odd K-cycle which is based on the Dirac operator (and its inverse, the Dirac propagator). Using (the perhaps more familiar) physics terminology, the key point in our strategy is this: instead of measuring length directly in space-time we measure the "algebraic (spectral) length" in the space of the corresponding quantum states of some particle (fermion) acted upon by the Dirac propagator. This approach shares the spirit of the unanimus vote of the 24th General Conference of Standards and Measures (21st October 2011) in Serves, France for the redefinition of the fundamental units using Planck's constant.

Ioannis P. Zois

2012-03-05T23:59:59.000Z

399

"YEAR","MONTH","STATE","UTILITY CODE","UTILITY NAME","RESIDENTIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL PHOTOVOLTAIC ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","TOTAL PHOTOVOLTAIC INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","COMMERCIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","INDUSTRIAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","TRANSPORTATIONPHOTOVOLTAIC NET METERING CUSTOMER COUNT","TOTAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","RESIDENTIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION WIND ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL WIND INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL WIND INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL WIND INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION WIND INSTALLED NET METERING CAPACITY (MW)","TOTAL WIND INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL WIND NET METERING CUSTOMER COUNT","COMMERCIAL WIND NET METERING CUSTOMER COUNT","INDUSTRIAL WIND NET METERING CUSTOMER COUNT","TRANSPORTATION WIND NET METERING CUSTOMER COUNT","TOTAL WIND NET METERING CUSTOMER COUNT","RESIDENTIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL OTHER INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL OTHER INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL OTHER INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION OTHER INSTALLED NET METERING CAPACITY (MW)","TOTAL OTHER INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL OTHER NET METERING CUSTOMER COUNT","COMMERCIAL OTHER NET METERING CUSTOMER COUNT","INDUSTRIAL OTHER NET METERING CUSTOMER COUNT","TRANSPORTATION OTHER NET METERING CUSTOMER COUNT","TOTAL OTHER NET METERING CUSTOMER COUNT","RESIDENTIAL TOTAL ENERGY SOLD BACK TO THE UTILITY (MWh)","COMMERCIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION TOTAL INSTALLED NET METERING CAPACITY (MW)","TOTAL INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL TOTAL NET METERING CUSTOMER COUNT","COMMERCIAL TOTAL NET METERING CUSTOMER COUNT","INDUSTRIAL TOTAL NET METERING CUSTOMER COUNT","TRANSPORTATION TOTAL NET METERING CUSTOMER COUNT","TOTAL NET METERING CUSTOMER COUNT","RESIDENTIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","COMMERCIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","INDUSTRIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TRANSPORTATION ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TOTAL ELECTRIC ENERGY SOLD BACK TO THE UTILITYFOR ALL STATES SERVED(MWh)","RESIDENTIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","COMMERCIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INDUSTRIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","TRANSPORTATION INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","RESIDENTIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","COMMERCIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","INDUSTRIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","TRANSPORTATION NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","NET METERING CUSTOMER COUNT FOR ALL STATES SERVED"  

U.S. Energy Information Administration (EIA) Indexed Site

TRANSPORTATIONPHOTOVOLTAIC NET METERING CUSTOMER COUNT","TOTAL PHOTOVOLTAIC NET METERING CUSTOMER COUNT","RESIDENTIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION WIND ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL WIND ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL WIND INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL WIND INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL WIND INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION WIND INSTALLED NET METERING CAPACITY (MW)","TOTAL WIND INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL WIND NET METERING CUSTOMER COUNT","COMMERCIAL WIND NET METERING CUSTOMER COUNT","INDUSTRIAL WIND NET METERING CUSTOMER COUNT","TRANSPORTATION WIND NET METERING CUSTOMER COUNT","TOTAL WIND NET METERING CUSTOMER COUNT","RESIDENTIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","COMMERCIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION OTHER ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL OTHER ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL OTHER INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL OTHER INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL OTHER INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION OTHER INSTALLED NET METERING CAPACITY (MW)","TOTAL OTHER INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL OTHER NET METERING CUSTOMER COUNT","COMMERCIAL OTHER NET METERING CUSTOMER COUNT","INDUSTRIAL OTHER NET METERING CUSTOMER COUNT","TRANSPORTATION OTHER NET METERING CUSTOMER COUNT","TOTAL OTHER NET METERING CUSTOMER COUNT","RESIDENTIAL TOTAL ENERGY SOLD BACK TO THE UTILITY (MWh)","COMMERCIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","INDUSTRIAL TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TRANSPORTATION TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","TOTAL ELECTRIC ENERGY SOLD BACK (MWh)","RESIDENTIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","COMMERCIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","INDUSTRIAL TOTAL INSTALLED NET METERING CAPACITY (MW)","TRANSPORTATION TOTAL INSTALLED NET METERING CAPACITY (MW)","TOTAL INSTALLED NET METERING CAPACITY (MW)","RESIDENTIAL TOTAL NET METERING CUSTOMER COUNT","COMMERCIAL TOTAL NET METERING CUSTOMER COUNT","INDUSTRIAL TOTAL NET METERING CUSTOMER COUNT","TRANSPORTATION TOTAL NET METERING CUSTOMER COUNT","TOTAL NET METERING CUSTOMER COUNT","RESIDENTIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","COMMERCIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","INDUSTRIAL ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TRANSPORTATION ELECTRIC ENERGY SOLD BACK TO THE UTILITY FOR ALL STATES SERVED(MWh)","TOTAL ELECTRIC ENERGY SOLD BACK TO THE UTILITYFOR ALL STATES SERVED(MWh)","RESIDENTIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","COMMERCIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INDUSTRIAL INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","TRANSPORTATION INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","INSTALLED NET METERING CAPACITY FOR ALL STATES SERVED(MW)","RESIDENTIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","COMMERCIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","INDUSTRIAL NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","TRANSPORTATION NET METERING CUSTOMER COUNT FOR ALL STATES SERVED","NET METERING CUSTOMER COUNT FOR ALL STATES SERVED"

400

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) |  

Open Energy Info (EERE)

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NIST Releases Test Framework for Upgrading of Smart Meters | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters July 12, 2012 - 10:46am Addthis The National Institute of Standards and Technology (NIST) has released a draft set of guidelines that will help utilities test their procedures for upgrading their smart meters securely from a remote location and determine whether their procedures conform with the National Electrical Manufacturers Association (NEMA) Standard for Smart Grid Upgradeability. Available now for public comment, the Advanced Metering Infrastructure Smart Meter Upgradeability Test Framework includes test procedures and detailed steps for conducting the test, reviewing results, and producing records to assess and report on these results.

402

Hydro-Québec Net Metering (Quebec, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydro-Québec Net Metering (Quebec, Canada) Hydro-Québec Net Metering (Quebec, Canada) Hydro-Québec Net Metering (Quebec, Canada) < Back Eligibility Commercial Agricultural Residential Savings Category Buying & Making Electricity Solar Program Info Funding Source Hydro-Quebec State Quebec Program Type Net Metering In line with Hydro-Québec's commitment to the environment and sustainable development, Hydro-Québec is supporting self-generation with a new rate offering: the net metering option. This option reflects a broad approach to energy efficiency. It is both environmentally friendly and advantageous for self-generators seeking to optimize their energy management. Net metering provides a way to act on convictions by using renewable energy and state-of-the-art technology to truly take control of consumption

403

Vids4Grids: Smart Meters and Super Cables | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grids: Smart Meters and Super Cables Grids: Smart Meters and Super Cables Vids4Grids: Smart Meters and Super Cables March 14, 2011 - 4:46pm Addthis This episode of Vids 4 Grids will take us to Itron's smart meter factory in West Union, SC where we will learn the role smart meters play in the Smart Grid. Deborah J. Buterbaugh Energy Project Specialist at National Energy Technology Laboratory What does this mean for me? Smart meters allow consumers to get real time information about their energy usage. Super cables help provide more reliable electricity to your home. In January we introduced you to the Vids4Grids project, a series of videos targeting students in high school and starting college. Through integration into curricula and online posting for open viewing, the project aims to increase awareness and create interest in power systems careers to help

404

Vids4Grids: Smart Meters and Super Cables | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vids4Grids: Smart Meters and Super Cables Vids4Grids: Smart Meters and Super Cables Vids4Grids: Smart Meters and Super Cables March 14, 2011 - 4:46pm Addthis This episode of Vids 4 Grids will take us to Itron's smart meter factory in West Union, SC where we will learn the role smart meters play in the Smart Grid. Deborah J. Buterbaugh Energy Project Specialist at National Energy Technology Laboratory What does this mean for me? Smart meters allow consumers to get real time information about their energy usage. Super cables help provide more reliable electricity to your home. In January we introduced you to the Vids4Grids project, a series of videos targeting students in high school and starting college. Through integration into curricula and online posting for open viewing, the project aims to increase awareness and create interest in power systems careers to help

405

Have You Used an Electric Meter to Measure Your Energy Use? | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Have You Used an Electric Meter to Measure Your Energy Use? Have You Used an Electric Meter to Measure Your Energy Use? Have You Used an Electric Meter to Measure Your Energy Use? December 10, 2009 - 7:30am Addthis This week, you read about using an electric meter to measure and manage your energy use. Using a meter could make you more conscious of exactly what items are costing you the most money. Plus, it can be kind of fun to put actual numbers to the various items in your home. Have you used an electric meter to measure your energy use? Tell us about your experience. Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles You Can't Manage Energy Use That You Don't Measure

406

VP 100: Smart Meters Will Help Customers Avoid High Electric Bills |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Meters Will Help Customers Avoid High Electric Bills Smart Meters Will Help Customers Avoid High Electric Bills VP 100: Smart Meters Will Help Customers Avoid High Electric Bills October 4, 2010 - 3:00pm Addthis An employee installs a smart meter as part of a smart grid initiative by EPB. The project is supporting 390 jobs in the Chattanooga area. | Photo courtesy of EPB An employee installs a smart meter as part of a smart grid initiative by EPB. The project is supporting 390 jobs in the Chattanooga area. | Photo courtesy of EPB Kevin Craft What are the key facts? EPB will install approximately 170,000 smart meters and 1,500 automated switches. They have the potential to provide a $300 million value to EPB and customers over a ten-year period. "Last winter I received a call from my son saying he had a $400 electric

407

VP 100: Smart Meters Will Help Customers Avoid High Electric Bills |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VP 100: Smart Meters Will Help Customers Avoid High Electric Bills VP 100: Smart Meters Will Help Customers Avoid High Electric Bills VP 100: Smart Meters Will Help Customers Avoid High Electric Bills October 4, 2010 - 3:00pm Addthis An employee installs a smart meter as part of a smart grid initiative by EPB. The project is supporting 390 jobs in the Chattanooga area. | Photo courtesy of EPB An employee installs a smart meter as part of a smart grid initiative by EPB. The project is supporting 390 jobs in the Chattanooga area. | Photo courtesy of EPB Kevin Craft What are the key facts? EPB will install approximately 170,000 smart meters and 1,500 automated switches. They have the potential to provide a $300 million value to EPB and customers over a ten-year period. "Last winter I received a call from my son saying he had a $400 electric

408

Engine ground demonstration test approach  

SciTech Connect

The hardware portion of the current phase of the Integrated Solar Upper Stage (ISUS) program culminates in a system ground demonstration test. The potential application of ISUS technology to a wide array of future missions complicates the process of selecting from among demonstration system design options and test approaches. The approach to this system demonstration has been to maximize system technology readiness level for the entire array of potential missions within the constraints of the program. To this end, system design and test operations planning has been carried out with a premium on demonstrating those elements of the system common to all missions. In addition, test planning has been managed to allow margin for testing those portions of the system envelope needed to confirm acceptable operation for scenarios within the mission set that are specific to a given mission or mission type. Examples drawn from the specific Engine Ground Demonstration (EGD) design selections are used to illuminate this approach, with the result that the EGD system design is not only described, but the reasons for its particular characteristics are made evident.

Kudija, C.T. [Rockwell Aerospace, Canoga Park, CA (United States). Rocketdyne Div.

1996-12-31T23:59:59.000Z

409

Mooring Motion Bias of Point-Doppler Current Meter Measurements Paul Freitag, Michael McPhaden, Chris Meinig, Patricia Plimpton  

E-Print Network (OSTI)

Mooring Motion Bias of Point-Doppler Current Meter Measurements Paul Freitag, Michael Mc). Until 1998 the moorings were instrumented with mechanical current meters (MCMs, either Vector Averaging Current Meters (VACM) or Vector Measuring Current Meters (VMCM)). Comparison with nearby subsurface 150 k

410

Four Current Meter Models Compared in Strong Currents in Drake Passage D. RANDOLPH WATTS, MAUREEN A. KENNELLY, KATHLEEN A. DONOHUE,  

E-Print Network (OSTI)

Four Current Meter Models Compared in Strong Currents in Drake Passage D. RANDOLPH WATTS, MAUREEN A February 2013, in final form 11 June 2013) ABSTRACT Seven current meters representing four models: two vector-measuring current meters (VMCMs), two Aanderaa recording current meter (RCM) 11s, two

Rhode Island, University of

411

A study of the coherent structures and installation effects in an orifice flow meter  

E-Print Network (OSTI)

. Errors on the order of approximately 250 millions of dollar per year have been estimated for the natural gas industry. The urgent need to improve the accuracy has fueled basic research in the area of orifice flow meters. The objectives of this present... study were to analyze the coherent structures present in an orifice flow meter, and to examine the effect of a flow conditioner placed upstream of the orifice plate on the flow meter's accuracy, The coherent structures were measured by performing...

Pattabhi, Srikanth

2012-06-07T23:59:59.000Z

412

Metering and the New Federal Requirements of Energy Policy Act 2005  

E-Print Network (OSTI)

METERING AND THE NEW FEDERAL REQUIREMENTS OF ENERGY POLICY ACT 2005 Ab Ream Federal Energy Management Program U.S. Department of Energy Washington, DC Malcolm E. Verdict Energy Systems Laboratory Texas A&M University System College... Station, Texas ABSTRACT Section 103 of the Energy Policy Act of 2005 (EPAct 2005) (1) mandates the installation of meters and advanced electric meters on all Federal Buildings by 2012 using guidelines developed by the US Department of Energy...

Ream, A.; Verdict, M.

2006-01-01T23:59:59.000Z

413

NIST Special Publication 1039r1 Liquid Flow Meter Calibrations with the  

E-Print Network (OSTI)

NIST Special Publication 1039r1 Liquid Flow Meter Calibrations with the 0.1 L/s and the 2.5 L Publication 1039r1 Liquid Flow Meter Calibrations with the 0.1 L/s and the 2.5 L/s Piston Provers Jodie G. Technol. Spec. Publ. 1039r1, 55 pages (December 2013) CODEN: NSPUE2 #12;Liquid Flow Meter Calibrations

414

Feasibility of the design of dual-lane ramp meters in Texas  

E-Print Network (OSTI)

Of Single- And Dual-Lane Ramp Meters . . . . . . . . . . . . . Microscopic Simulation Analysis Of Traffic Control And Operational Characteristics . 58 60 61 63 65 65 66 V STUDY RESULTS . . . 72 Gessner Street/Katy Freeway Single-Lane Ramp Meter... . . . . . . 108 APPENDIX A DUAL-LANE RAMP METER SURVEY AND MAILING LIST . . . . . . 112 APPENDIX B MAY 1997 QUEUE AND DEMAND VOLUME DATA FOR THE GESSNER STREET/KATY FREEWAY SINGLE-LANE RAMP . . . . 120 APPENDIX C PROPOSED GESSNER STREET/KATY FREEWAY DUAL...

Butorac, Marc Allen

2012-06-07T23:59:59.000Z

415

Genetic fuzzy logic approach to local ramp metering control using microscopic traffic simulation.  

E-Print Network (OSTI)

??Ramp metering, one of the most effective solutions for improving motorway traffic flows, is playing increasingly important role in traffic management systems. Because of its (more)

Yu, Xue Feng

2009-01-01T23:59:59.000Z

416

Uncertainty Analysis for a Virtual Flow Meter Using an Air-Handling Unit Chilled Water Valve  

SciTech Connect

A virtual water flow meter is developed that uses the chilled water control valve on an air-handling unit as a measurement device. The flow rate of water through the valve is calculated using the differential pressure across the valve and its associated coil, the valve command, and an empirically determined valve characteristic curve. Thus, the probability of error in the measurements is significantly greater than for conventionally manufactured flow meters. In this paper, mathematical models are developed and used to conduct uncertainty analysis for the virtual flow meter, and the results from the virtual meter are compared to measurements made with an ultrasonic flow meter. Theoretical uncertainty analysis shows that the total uncertainty in flow rates from the virtual flow meter is 1.46% with 95% confidence; comparison of virtual flow meter results with measurements from an ultrasonic flow meter yielded anuncertainty of 1.46% with 99% confidence. The comparable results from the theoretical uncertainty analysis and empirical comparison with the ultrasonic flow meter corroborate each other, and tend to validate the approach to computationally estimating uncertainty for virtual sensors introduced in this study.

Song, Li; Wang, Gang; Brambley, Michael R.

2013-04-28T23:59:59.000Z

417

Systematic Errors in Measuring the Energy of Wet Steam with Dry-Steam Meters  

Science Journals Connector (OSTI)

Systematic errors are considered in measuring mass flow rate, specific enthalpy, thermal power, and energy for wet steam by means of meters intended for dry saturated steam.

E. G. Abarinov; K. S. Sarelo

2002-03-01T23:59:59.000Z

418

Experience in the Application of Single-Beam Ultrasonic Flow Meters for Turbines  

SciTech Connect

Experience in the use of ultrasonic flow meters at the Bratskaya and Vilyuiskaya HPP is described. The article is of interest to field engineers.

Krasilnikov, A. M.; Dmitriev, S. G. [Joint-Stock Company 'Research Institute for Power Constructions' (Russian Federation); Karyakin, V. A. [Zagorsk Hydroelectric Pumped Storage Power Plant (Russian Federation)

2002-03-15T23:59:59.000Z

419

Surfactants for ground water remediation  

Science Journals Connector (OSTI)

Ground water contamination is a most intractable form of pollution. Spilled solvent or fuel liquids are trapped below the water table by colloidal forces. Surfactants may be used to dramatically improve contaminated aquifer remediation rates. Principal remediation mechanisms include micellar solubilization and mobilization of the trapped liquids by lowering of the oil/water interfacial tension. Surfactant selection is a key to the successful design of a remediation effort, and involves consideration of factors including Krafft Point, surfactant adsorption onto the aquifer solids, and the phase behavior of the oil/water/surfactant system. Successful field demonstrations have occurred in recent months and the technology is moving rapidly toward commercialization. Critical research issues remain including acceptable clean-up levels, surfactant/contaminant in situ biodegradation rates, and surfactant decontamination and reuse.

Jeffrey H. Harwell; David A. Sabatini; R.C. Knox

1999-01-01T23:59:59.000Z

420

Radionuclide characterization, migration, and monitoring at a commercial low-level waste disposal site  

SciTech Connect

A commercial low-level radioactive waste disposal facility is being studied to characterize the physicochemical forms of the radionuclides and their behavior during migration in ground waters. Environmental monitoring studies are also in progress to identify and assess migration pathways of the radionuclides. At the Maxey Flats, Kentucky low-level waste burial site, mobile species of various radionuclides have migrated short distances on-site (meters to tens of meters) from the trenches. Plutonium is migrating as a soluble anionic complex in the Pu(III) and Pu(IV) oxidation states. Empirical evidence suggests that EDTA contained in the trench water has formed strong organic complexes with plutonium and /sup 60/Co, thereby increasing their mobility. Mobile forms of /sup 90/Sr and /sup 137/Cs are associated with a variety of polar organic species, e.g. carboxylic acids. Environmental monitoring studies at the Maxey Flats site are assessing surface contamination and biological monitoring techniques which can be used for long-term surveillance. Deciduous forests growing near the Maxey Flats site offer the potential to detect the migration of radionuclides, particularly tritium, occurring by subterranean flow from the waste trenches of the flow is within the rooting depth of the trees.

Kirby, L.J.; Toste, A.P.; Rickard, W.H.

1983-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Ground Squirrels and Gophers  

NLE Websites -- All DOE Office Websites (Extended Search)

Squirrels and Gophers Squirrels and Gophers Nature Bulletin No. 224-A April 2, 1966 Forest Preserve District of Cook County Seymour Simon, President Roland F. Eisenbeis, Supt. of Conservation GROUND SQUIRRELS AND GOPHERS On sunny summer days, a dusty-colored animal with yellowish and brown stripes, about the size of a small rat, often may be noticed creeping through the grass of prairies, pastures, golf courses or lawns. Watch him. He pauses every few feet to sit up, look and listen for a moment. Nervous and timid, he crouches low at every distant sound or passing shadow. Startle him and he scurries away, and then may suddenly halt and freeze, bolt upright, as stiff and straight as a stake driven in the ground. If approached, he gives a loud shrill trilling whistle and, with a flip of his tail, pops out of sight. Watch that spot closely and, in less than a minute, a snaky head appears. Be quiet. He has many enemies above ground and he also has a lot of curiosity. Presently he sits up upon his haunches again.

422

Meter Damage: Many customers have questions about who is responsible for repair to the electrical service at their homes. These pages may help to answer  

E-Print Network (OSTI)

Meter Damage: Many customers have questions about who is responsible for repair. weather head stack meter base connectors house knob weather head connectors mast clamp stack meter base meter meter #12; Let's start with definitions: Meter base: This is the metal box mounted

Rose, Annkatrin

423

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

The Private and Public Economies of Renewable Electricityprivate sector, began to push for deregulation in the electricityprivate customer value of behind-the-meter PV generation, as potential customers most often will consider the value of avoided electricity

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

424

Ground Water Recovery and Treatment  

Science Journals Connector (OSTI)

Until the environmental revolution, the only ground water that was routinely treated to remove contamination was the impacted ground water that was extracted for beneficial use. With ... the recognition that cont...

Tie Li Ph.D.; Raaj U. Patel P.G.; David K. Ramsden Ph.D.

2003-01-01T23:59:59.000Z

425

Flow meter evaluation for U.S. Navy Public Works Center, San Diego, California  

SciTech Connect

The U.S. Navy Public Works Center San Diego (PWCSD) was concerned about the accuracy of various flow meters on steam and compressed air lines serving Naval facilities in San Diego, California. The flow meters had experienced various inconsistencies that had not been resolved prior to July 1993. Pacific Northwest Laboratory, Richland, Washington, evaluated the operation of 10 out of 79 steam and compressed air flow meters at PWCSD. The evaluation was limited to analysis of historical information and review of existing operating procedures. On-site investigation of the flow meters was limited to external observations of the flow-sensing equipment and a check of the flow computer program. PNL did not remove installed sensing equipment (i.e., flow meters or temperature or pressure sensors) to evaluate existing condition or check calibration. Although many of the flow meter errors can be traced to improperly normalized readings and to meters improperly compensated for temperature and pressure, lack of regular maintenance, including proper calibration, was evidenced throughout this study. A strict calibration schedule should be established for all steam and air flow meters, including calibration of the temperature sensor, pressure sensor, and flow turbine. It is recommended that the most crucial flow meters (such as the 10 evaluated in this study) be calibrated yearly. The remaining 69 flow meters could be placed on a staggered, biyearly calibration schedule. Calibration should be done by qualified personnel only. Improper calibration is often worse than no calibration at all. An outside firm is recommended to be contracted with to perform all maintenance and calibration on flow meters at the Naval facilities. Use of an outside firm would better facilitate regular, reliable calibration while removing liability for damaged parts.

Chvala, W.D. Jr.; McMordie, K.L.; Szydlowski, R.F.

1995-06-01T23:59:59.000Z

426

Estimating the economic cost of sea-level rise  

E-Print Network (OSTI)

(cont.) In the case of a classical linear sea-level rise of one meter per century, the use of DIVA generally decreases the protection fraction of the coastline, and results in a smaller protection cost because of high ...

Sugiyama, Masahiro, Ph. D. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

427

Response of a slotted plate flow meter to horizontal two phase flow  

E-Print Network (OSTI)

meter is always better in performance and accuracy than the standard orifice plate flow meter. This study is primarily based on how a slotted plate responds to horizontal two-phase flow with air and water being used as the working fluids. The plates...

Muralidharan, Vasanth

2005-02-17T23:59:59.000Z

428

Unaccounted-for gas project. Measurement Task Force (orifice meter studies). Volume 2B. Final report  

SciTech Connect

The study was aimed at determining unaccounted-for (UAF) gas volumes resulting from operating Pacific Gas and Electric Co.'s transmission and distribution systems during 1987. Activities and methods are described and results are presented for research conducted on orifice meter accuracy. The Measurement Task Force determined that orifice metering inaccuracies were the largest single contributor to 1987 UAF.

Godkin, B.J.; Robertson, J.D.; Wlasenko, R.G.; Cowgill, R.M.; Grinstead, J.R.

1990-06-01T23:59:59.000Z

429

Trinity College Green Week 2012 Energy Competition Win a Domestic Energy Meter  

E-Print Network (OSTI)

Trinity College Green Week 2012 Energy Competition ­ Win a Domestic Energy Meter As part of College Green Week the "e3" programme and Director of Buildings Office is promoting an energy related would you like to win a domestic whole house energy meter as part of Trinity College Green Week 2012

O'Mahony, Donal E.

430

THE CONGESTION PIE: DELAY FROM COLLISIONS, POTENTIAL RAMP METERING GAIN, AND EXCESS DEMAND  

E-Print Network (OSTI)

THE CONGESTION PIE: DELAY FROM COLLISIONS, POTENTIAL RAMP METERING GAIN, AND EXCESS DEMAND the great potential to mitigate congestion by ramp metering. In addition to the three congestion pie slices in the division of the congestion `pie' into its constituent slices as in Figure 1. Knowledge of the congestion

Varaiya, Pravin

431

Performance Evaluation of Adaptive Ramp-Metering Algorithms Using Microscopic Traffic Simulation Model  

E-Print Network (OSTI)

to implementation on the target freeway network. In this paper, a capability-enhanced PARAMICS simulation model has evaluation; Simulation models; Algorithms. Introduction Ramp metering has been recognized as an effectivePerformance Evaluation of Adaptive Ramp-Metering Algorithms Using Microscopic Traffic Simulation

Levinson, David M.

432

Hanford Site ground-water monitoring for 1994  

SciTech Connect

This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1994 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiologic and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1994 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1993 and June 1994. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal.

Dresel, P.E.; Thorne, P.D.; Luttrell, S.P. [and others

1995-08-01T23:59:59.000Z

433

Hanford Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped Four Months Ahead of Schedule Hanford Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped Four Months Ahead of Schedule June 2, 2011 - 12:00pm Addthis Media Contact Cameron Hardy, DOE (509) 376-5365 Cameron.Hardy@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) at Hanford surpassed a Tri-Party Agreement Milestone by four months in shipping 1,000 cubic meters of transuranic waste off the Hanford Site in route to the Waste Isolation Pilot Plant (WIPP) in New Mexico before September 30, 2011. The milestone for shipping waste was met in May 2011. Since the shipments began in 2000, 620 shipments have left the Hanford Site, a total of 4,137 cubic meters of transuranic waste. Milestones for

434

Tips: Smart Meters and a Smarter Power Grid | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tips: Smart Meters and a Smarter Power Grid Tips: Smart Meters and a Smarter Power Grid Tips: Smart Meters and a Smarter Power Grid July 2, 2012 - 8:13pm Addthis The Smart Grid will consist of controls, computers, automation, and new technologies and equipment -- including a smart meter at your home -- working together to respond digitally to our quickly changing electric demand. The Smart Grid will consist of controls, computers, automation, and new technologies and equipment -- including a smart meter at your home -- working together to respond digitally to our quickly changing electric demand. What are the key facts? Like the Internet, the Smart Grid will consist of controls, computers, automation, and new technologies and equipment working together to respond digitally to our quickly changing electric demand.

435

Hydro-Québec Net Metering (Quebec, Canada) | Open Energy Information  

Open Energy Info (EERE)

Hydro-Québec Net Metering (Quebec, Canada) Hydro-Québec Net Metering (Quebec, Canada) No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Last modified on February 13, 2013. EZFeed Policy Place Quebec, Canada Applies to Utility Hydro-Quebec Name Hydro-Québec Net Metering (Quebec, Canada) Policy Type Net Metering Affected Technologies Geothermal Electric, Solar Photovoltaics Active Policy Yes Implementing Sector Utility Funding Source Hydro-Quebec Primary Website http://www.hydroquebec.com/self-generation/index.html Summary In line with Hydro-Québec's commitment to the environment and sustainable development, Hydro-Québec is supporting self-generation with a new rate offering: the net metering option. This option reflects a broad approach to

436

Hanford Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped Four Months Ahead of Schedule Hanford Surpasses Transuranic Waste Milestone: 1,000 Cubic Meters Shipped Four Months Ahead of Schedule June 2, 2011 - 12:00pm Addthis Media Contact Cameron Hardy, DOE (509) 376-5365 Cameron.Hardy@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) at Hanford surpassed a Tri-Party Agreement Milestone by four months in shipping 1,000 cubic meters of transuranic waste off the Hanford Site in route to the Waste Isolation Pilot Plant (WIPP) in New Mexico before September 30, 2011. The milestone for shipping waste was met in May 2011. Since the shipments began in 2000, 620 shipments have left the Hanford Site, a total of 4,137 cubic meters of transuranic waste. Milestones for

437

The LOFT Ground Segment  

E-Print Network (OSTI)

LOFT, the Large Observatory For X-ray Timing, was one of the ESA M3 mission candidates that completed their assessment phase at the end of 2013. LOFT is equipped with two instruments, the Large Area Detector (LAD) and the Wide Field Monitor (WFM). The LAD performs pointed observations of several targets per orbit (~90 minutes), providing roughly ~80 GB of proprietary data per day (the proprietary period will be 12 months). The WFM continuously monitors about 1/3 of the sky at a time and provides data for about ~100 sources a day, resulting in a total of ~20 GB of additional telemetry. The LOFT Burst alert System additionally identifies on-board bright impulsive events (e.g., Gamma-ray Bursts, GRBs) and broadcasts the corresponding position and trigger time to the ground using a dedicated system of ~15 VHF receivers. All WFM data are planned to be made public immediately. In this contribution we summarize the planned organization of the LOFT ground segment (GS), as established in the mission Yellow Book 1 . We...

Bozzo, E; Argan, A; Barret, D; Binko, P; Brandt, S; Cavazzuti, E; Courvoisier, T; Herder, J W den; Feroci, M; Ferrigno, C; Giommi, P; Gtz, D; Guy, L; Hernanz, M; Zand, J J M in't; Klochkov, D; Kuulkers, E; Motch, C; Lumb, D; Papitto, A; Pittori, C; Rohlfs, R; Santangelo, A; Schmid, C; Schwope, A D; Smith, P J; Webb, N A; Wilms, J; Zane, S

2014-01-01T23:59:59.000Z

438

Insights from Smart Meters: The Potential for Peak-Hour Savings from Behavior-Based Programs  

SciTech Connect

The rollout of smart meters in the last several years has opened up new forms of previously unavailable energy data. Many utilities are now able in real-time to capture granular, household level interval usage data at very high-frequency levels for a large proportion of their residential and small commercial customer population. This can be linked to other time and locationspecific information, providing vast, constantly growing streams of rich data (sometimes referred to by the recently popular buzz word, big data). Within the energy industry there is increasing interest in tapping into the opportunities that these data can provide. What can we do with all of these data? The richness and granularity of these data enable many types of creative and cutting-edge analytics. Technically sophisticated and rigorous statistical techniques can be used to pull interesting insights out of this highfrequency, human-focused data. We at LBNL are calling this behavior analytics. This kind of analytics has the potential to provide tremendous value to a wide range of energy programs. For example, highly disaggregated and heterogeneous information about actual energy use would allow energy efficiency (EE) and/or demand response (DR) program implementers to target specific programs to specific households; would enable evaluation, measurement and verification (EM&V) of energy efficiency programs to be performed on a much shorter time horizon than was previously possible; and would provide better insights in to the energy and peak hour savings associated with specifics types of EE and DR programs (e.g., behavior-based (BB) programs). In this series, Insights from Smart Meters, we will present concrete, illustrative examples of the type of value that insights from behavior analytics of these data can provide (as well as pointing out its limitations). We will supply several types of key findings, including: Novel results, which answer questions the industry previously was unable to answer; Proof-of-concept analytics tools that can be adapted and used by others; and Guidelines and protocols that summarize analytical best practices. This report focuses on one example of the kind of value that analysis of this data can provide: insights into whether behavior-based (BB) efficiency programs have the potential to provide peak-hour energy savings.

Todd, Annika; Perry, Michael; Smith, Brian; Sullivan, Michael; Cappers, Peter; Goldman, Charles

2014-03-25T23:59:59.000Z

439

Ground potential rise monitor  

DOE Patents (OSTI)

A device and method for detecting ground potential rise (GPR) comprising positioning a first electrode and a second electrode at a distance from each other into the earth. The voltage of the first electrode and second electrode is attenuated by an attenuation factor creating an attenuated voltage. The true RMS voltage of the attenuated voltage is determined creating an attenuated true RMS voltage. The attenuated true RMS voltage is then multiplied by the attenuation factor creating a calculated true RMS voltage. If the calculated true RMS voltage is greater than a first predetermined voltage threshold, a first alarm is enabled at a local location. If user input is received at a remote location acknowledging the first alarm, a first alarm acknowledgment signal is transmitted. The first alarm acknowledgment signal is then received at which time the first alarm is disabled.

Allen, Zachery W. (Mandan, ND); Zevenbergen, Gary A. (Arvada, CO)

2012-04-03T23:59:59.000Z

440

Experimental test results presented for field-damaged orifice meter plates  

SciTech Connect

Tests demonstrate that, unlike other types of meters, there is minimal loss of accuracy with orifice meters even when operational excursions are such that severe damage occurs. Both flange taps and pipe taps effectively have the same general pattern in that the actual coefficient increases with increasing permanent deformation. Of the two types of orifice tap, these data indicate that flange-tapped orifices may be less susceptible to severe deformation. This is probably caused by changes in the local pressure gradients in the vicinity of the plate. Since pipe taps are at such a large distance from the plate, these changes are probably not noticeable due to the turbulent mixing that takes place. With orifice meters, visual inspection of the plates after severe operation is recommended, to tell the user if the plate is beyond specifications. With other types of meters (i.e., other than differential meters) recalibration is the only method of determining if the meter has been affected. Where damage is apparent, the plate (or the meter if it is not of the differential type) should be immediately replaced.

Teyssandier, R.G.; Chisman, W.E.

1984-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

The Impact of Rate Design and Net Metering on the Bill Savings from  

NLE Websites -- All DOE Office Websites (Extended Search)

The Impact of Rate Design and Net Metering on the Bill Savings from The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California Title The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Darghouth, Naïm, Galen L. Barbose, and Ryan H. Wiser Pagination 62 Date Published 04/2010 Publisher LBNL City Berkeley Keywords electricity markets and policy group, electricity rate design, energy analysis and environmental impacts department, net metering, photovoltaics Abstract Net metering has become a widespread policy in the U.S. for supporting distributed photovoltaics (PV) adoption.1 Though specific design details vary, net metering allows customers with PV to reduce their electric bills by offsetting their consumption with PV generation, independent of the timing of the generation relative to consumption - in effect, compensating the PV generation at retail electricity rates (Rose et al. 2009). Though net metering has played an important role in jump-starting the PV market in the U.S., challenges to net metering policies have emerged in a number of states and contexts, and alternative compensation methods are under consideration. Moreover, one inherent feature of net metering is that the value of the utility bill savings it provides to customers with PV depends heavily on the structure of the underlying retail electricity rate, as well as on the characteristics of the customer and PV system. Consequently, the bill-savings value of net metering - and the impact of moving to alternative compensation mechanisms - can vary substantially from one customer to the next. For these reasons, it is important for policymakers and others that seek to support the development of distributed PV to understand both how the bill savings benefits of PV varies under net metering, and how the bill savings under net metering compares to savings associated with other possible compensation mechanisms. To advance this understanding, we analyze the bill savings from PV for residential customers of California's two largest electric utilities, Pacific Gas and Electric (PG&E) and Southern California Edison (SCE).3 The analysis is based on hourly load data from a sample of 215 residential customers located in the service territories of the two utilities, matched with simulated hourly PV production for the same time period based on data from the nearest of 73 weather stations in the state. We focus on these two utilities, both because we had ready access to a sample of load data for their residential customers, and because their service territories are the largest markets for residential PV in the country.

442

Instrument Qualification of Custom Fabricated Water Activity Meter for Hot Cell Use  

SciTech Connect

This report describes a custom fabricated water activity meter and the results of the qualification of this meter as described in the laboratory test plan LAB-PLN-11-00012, Testing and Validation of an Enhanced Acquisition and Control System. It was calibrated against several NaOH solutions of varying concentrations to quantify the accuracy and precision of the instrument at 20 C and 60 C. Also, a schematic and parts list of the equipment used to make the water activity meter will be presented in this report.

McCoskey, Jacob K.

2014-01-22T23:59:59.000Z

443

A model of the VU (volume-unit) meter, with speech applications Bryce E. Lobdell and Jont B. Allen  

E-Print Network (OSTI)

A model of the VU (volume-unit) meter, with speech applications Bryce E. Lobdell and Jont B. Allen October 2006; accepted 12 October 2006 The Volume-Unit VU meter, used in speech research prior. There are no known software implementations of this meter, which meet the 1954 ASA standard and provide

Allen, Jont

444

Monjolo: An Energy-Harvesting Energy Meter Architecture Samuel DeBruin, Bradford Campbell, and Prabal Dutta  

E-Print Network (OSTI)

Monjolo: An Energy-Harvesting Energy Meter Architecture Samuel DeBruin, Bradford Campbell 48109 {sdebruin,bradjc,prabal}@eecs.umich.edu ABSTRACT Conventional AC power meters perform at least two distinct func- tions: power conversion, to supply the meter itself, and energy me- tering, to measure

Dutta, Prabal

445

Electricit de France's study of the acoustic scintillation flow meter results in expanding its range and sensitivity  

E-Print Network (OSTI)

Electricité de France's study of the acoustic scintillation flow meter results in expanding its to study the Acoustic Scintillation Flow Meter (ASFM) developed by ASL AQFlow. The study was done for the next generation of acoustic scintillation flow meters. 1. Background For EDF's hydraulic power division

Paris-Sud XI, Université de

446

Traffic Equilibration: The Case of the Twin Cities Ramp Meter Shut Off David Levinson1and Atif Sheikh2  

E-Print Network (OSTI)

Traffic Equilibration: The Case of the Twin Cities Ramp Meter Shut Off David Levinson1and Atif Sheikh2 Abstract In Fall 2000, more than 430 ramp meters in the Twin Cities metropolitan area were shut down in order to evaluate the effectiveness of the metering system. This shutdown disturbed normal

Levinson, David M.

447

SDG&E Customers Can Connect Home Area Network Devices With Smart Meters |  

Open Energy Info (EERE)

SDG&E Customers Can Connect Home Area Network Devices With Smart Meters SDG&E Customers Can Connect Home Area Network Devices With Smart Meters Home > Groups > Utility Rate Graham7781's picture Submitted by Graham7781(2002) Super contributor 16 January, 2013 - 11:09 OpenEI San Diego Gas and Electric Smart Meters Smartgrid article reposted from Smartgrid.gov SAN DIEGO, Jan. 10, 2013 - San Diego Gas & Electric (SDG&E) customers can now purchase and install home area network devices to see how much energy they are using in near real-time and help identify high energy use appliances. With in-home energy display devices connected to their electric smart meters, SDG&E customers have access to a new tool to help them make smart energy consumption decisions to reduce their overall energy usage and costs. SDG&E has tested several new in-home energy display devices and customers

448

Pantex installs new meters to help to reduce energy consumption | National  

NLE Websites -- All DOE Office Websites (Extended Search)

meters to help to reduce energy consumption | National meters to help to reduce energy consumption | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new meters to help to ... Pantex installs new meters to help to reduce energy consumption Posted By Office of Public Affairs Project Manager Janice Clark gives a safety briefing.

449

Tips: Smart Meters and a Smarter Power Grid | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Tips: Smart Meters and a Smarter Power Grid Tips: Smart Meters and a Smarter Power Grid July 2, 2012 - 8:13pm Addthis The Smart Grid will consist of controls, computers, automation, and new technologies and equipment -- including a smart meter at your home -- working together to respond digitally to our quickly changing electric demand. The Smart Grid will consist of controls, computers, automation, and new technologies and equipment -- including a smart meter at your home -- working together to respond digitally to our quickly changing electric demand. What are the key facts? Like the Internet, the Smart Grid will consist of controls, computers, automation, and new technologies and equipment working together to respond digitally to our quickly changing electric demand.

450

Pantex installs new meters to help to reduce energy consumption | National  

National Nuclear Security Administration (NNSA)

meters to help to reduce energy consumption | National meters to help to reduce energy consumption | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new meters to help to ... Pantex installs new meters to help to reduce energy consumption Posted By Office of Public Affairs Project Manager Janice Clark gives a safety briefing.

451

Use of Rapid Temperature Measurements at a 2-Meter Depth to Augment Deeper  

Open Energy Info (EERE)

Use of Rapid Temperature Measurements at a 2-Meter Depth to Augment Deeper Use of Rapid Temperature Measurements at a 2-Meter Depth to Augment Deeper Temperature Gradient Drilling Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Use of Rapid Temperature Measurements at a 2-Meter Depth to Augment Deeper Temperature Gradient Drilling Abstract Temperature gradient drilling has historically been a key tool in the exploration for geothermal resources in the Great Basin, USA, but regulatory, environmental, and accessibility issues, as well as the expense of drilling, are increasingly limiting its use. In cases where thermal groundwater is not overlain by near-surface cold aquifers, it is possible to augment temperature gradient drilling with temperatures measured from a 2-meter depth. We discuss the development of a rapid, efficient, and

452

Nissan and Centro partner to reduce energy cost 20% through improved metering  

NLE Websites -- All DOE Office Websites (Extended Search)

Centro Inc. Nissan Centro Inc. Nissan 321 Hill Avenue 983 Nissan Drive Nashville, TN 37210 Smyrna, TN 37167 Business: Flow Control Distributor & Representative Business: Automobile Manufacturing Brad Davis Chris Goddard Territory Manager Environmental Engineer Phone: 615-255-2220 Phone: 615-459-1633 Email: bdavis@centromemphis.com Email: chris.goddard@nissan-usa.com Nissan and Centro partner to reduce energy cost 20% through improved metering Project Scope Nissan wanted to precisely measure consumption by department in their Smyrna facility. For low pressure natural gas applications, Nissan sought a simple, reliable metering device with no moving parts. Centro determined that the Aaliant Target Flow meter and the Fox Thermal Mass Flow meter would meet

453

The Intersection of Net Metering and Retail Choice: An Overview of Policy, Practice and Issues  

Energy.gov (U.S. Department of Energy (DOE))

In this report, the authors studied different facets of crediting mechanisms, and defined five different theoretical models describing different ways competitive suppliers and utilities provide net metering options for their customers. They then provided case studies to illustrate the models.

454

A Key Management Scheme for Secure Communications of Advanced Metering Infrastructure  

Science Journals Connector (OSTI)

Key management for secure communications of Advanced Metering Infrastructure is an unsolved problem until now. The ... proposing a key management scheme based on a hybrid-tree graph for AMI. The cyber security...

Jinshan Chen; Nian Liu; Wenxia Liu; Hong Luo

2011-01-01T23:59:59.000Z

455

Evaluation of a Close Coupled Slotted Orifice, Electrical Impedance, and Swirl Flow Meters for Multiphase Flow  

E-Print Network (OSTI)

homogenized flow for several pipe diameters downstream of the plate. This characteristic provides a homogeneous mixture at the inlet of the swirl meter, and impedance probe for gas volume fraction measurement (GVF). In order to evaluate the performance...

Cevik, Muhammet

2013-09-11T23:59:59.000Z

456

Too expensive to meter: the influence of transaction costs in transportation and communication  

Science Journals Connector (OSTI)

...the US Atomic Energy Commission, is...enjoy in their homes electrical energy too cheap to meter...of electricity consumption in the system...reduce electricity consumption or at least shift...the declining average (or per user...

2008-01-01T23:59:59.000Z

457

High Resolution Study of Micro-Meter Particle Detachment and Resuspension on Different Surfaces  

E-Print Network (OSTI)

In an effort to understand the resuspension phenomena, interactions of spherical micro-meter particles (glass beads (GB) and Stainless steel (SS)) were investigated experimentally on different surfaces (glass, ceramic, hardwood, metal and chemical...

Kassab, Asmaa 1983-

2012-08-16T23:59:59.000Z

458

Nissan North America: How Sub-Metering Changed the Way a Plant Does Business  

Energy.gov (U.S. Department of Energy (DOE))

This case study describes how Nissan North America uses sub-meters to measure a range of variables at its U.S. plants, including electricity and compressed air, and identify opportunities to reduce energy consumption.

459

The Impact of Rate Design and Net Metering on the Bill Savings from  

Open Energy Info (EERE)

Impact of Rate Design and Net Metering on the Bill Savings from Impact of Rate Design and Net Metering on the Bill Savings from Distributed Photovoltaics (PV) for Residential Customers in California Jump to: navigation, search Tool Summary LAUNCH TOOL Name: The Impact of Rate Design and Net Metering on the Bill Savings from Distributed Photovoltaics (PV) for Residential Customers in California Focus Area: Renewable Energy Topics: Best Practices Website: eetd.lbl.gov/ea/emp/reports/lbnl-3276e.pdf Equivalent URI: cleanenergysolutions.org/content/impact-rate-design-and-net-metering-b Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration & Implementation This report analyzes the bill savings from photovoltaic (PV) deployment for residential customers of California's two largest electric utilities -

460

A field example of a gas orifice meter with debris-ridden liquid in mist flow  

SciTech Connect

A field example of debris-ridden liquids in an orifice meter is presented in this paper. Flow conditions in gas pipelines containing hydrocarbon liquids and particulate matter are discussed. Known effects on measurement of the presence of these materials in orifice meters is presented. By definition, gas measurement is accurate if performed on a clean and dry flow stream. This paper demonstrates the importance of removing as much liquid and debris as possible prior to measurement.

Chisholm, J.L.; Mooney, C.V. [Texas A and M Univ., Kingsville, TX (United States); Datta-Barua, L.; Feldmann, R.J.

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The effects between two slotted plate flow meter under single, two, three components flow condition  

E-Print Network (OSTI)

THE INTERACTION BETWEEN A TWO SLOTTED PLATE FLOW METER UNDER ONE, TWO, OR THREE COMPONENT FLOW CONDITIONS A Thesis by SANG HYUN PARK Submitted to the Office of Graduate Studies of Texas A&M University in partial... fulfillment of the requirements for the degree of MASTER OF SCIENCE December 2004 Major Subject: Mechanical Engineering THE INTERACTION BETWEEN A TWO SLOTTED PLATE FLOW METER UNDER ONE, TWO, OR THREE COMPONENT FLOW...

Park, Sang Hyan

2005-02-17T23:59:59.000Z

462

Sub-metering to Electricity Use in Large-scale Commercial Buildings  

E-Print Network (OSTI)

;?#0;? Practice??Project example #0;?#0;? Use of data??Analysis Software Sub-metering and statistics to electricity use in commercial buildings 8 Method of sub-metering Whole electric power consumption of a building Hvac system Heating Circulating pump Oter... systems and equipments Equipments on Socket Special function room Electrically driven heating equipment Chiller Fan of cooling tower Chilled pump cooling pump Air hand unit Fresh air hand unit Fan coil unit Air conditioner Heating water system drinking...

Yuan, W.

2006-01-01T23:59:59.000Z

463

Evaluation of a slotted orifice plate flow meter using horizontal two phase flow  

E-Print Network (OSTI)

of MASTER OF SCIENCE December 2000 Major Subject: Mechanical Engineering EVALUATION OF A SLOTTED ORIFICE PLATE FLOW METER USING HORIZONTAL TWO PHASE FLOW A Thesis by ANITA ELENA FLORES Submitted to Texas A&M University in partial fulfillment...: Mechanical Engineering ABSTRACT Fvaluation of a Slotted Orifice Plate Flow Meter Using Horizontal Two Phase Flow. (December 2000) Anita Elena Flores, B. S. , Texas A&M I Jniversitv Chair of Advisory Committee: Dr. Herald L. Morrison In the past several...

Flores, Anita Elena

2012-06-07T23:59:59.000Z

464

Systematic mapping of Leaf Area Index across Canada using 250-meter MODIS data  

Science Journals Connector (OSTI)

An approach to generate a 250-meter Canada wide Leaf Area Index (LAI) map using 250-meter MODIS data is described. The full processing chain is introduced. The approach is based on intercalibration of Landsat and MODIS vegetation indices (VI's) combined with LAIVI's empirical relationships. Preliminary validation over two sites where field work was carried out shows promising results. Intercalibration of MODIS VI's before deriving LAI maps provides up to 65% improvement of the LAI overall accuracy.

Nadia Rochdi; Richard Fernandes

2010-01-01T23:59:59.000Z

465

EPA Final Ground Water Rule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Nuclear Safety and Environment Office of Nuclear Safety and Environment Nuclear Safety and Environment Information Brief HS-20-IB-2007-02 (March 2007) EPA Final Ground Water Rule Safe Drinking Water Act: National Primary Drinking Water Regulations Ground Water Rule - 40 CFR Parts 9, 141 and 142 Final Rule: 71 FR 65574 Effective Date: January 8, 2007 1 RULE SYNOPSIS On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in public water systems (PWSs) that use ground water sources for their supply (these systems are known as ground water systems). This Rule establishes a risk-targeted approach

466

On LHCb muon MWPC grounding  

E-Print Network (OSTI)

My goal is to study how a big MWPC system, in particular the LHCb muon system, can be protected against unstable operation and multiple spurious hits, produced by incorrect or imperfect grounding in the severe EM environment of the LHCb experiment. A mechanism of penetration of parasitic current from the ground loop to the input of the front-end amplifier is discussed. A new model of the detector cell as the electrical bridge is considered. As shown, unbalance of the bridge makes detector to be sensitive to the noise in ground loop. Resonances in ground loop are specified. Tests of multiple-point and single-point grounding conceptions made on mock-up are presented.

Kashchuk, A

2006-01-01T23:59:59.000Z

467

Hanford Site ground-water monitoring for 1993  

SciTech Connect

This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices.

Dresel, P.E.; Luttrell, S.P.; Evans, J.C. [and others

1994-09-01T23:59:59.000Z

468

Regional analysis of ground and above-ground climate  

SciTech Connect

The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

Not Available

1981-12-01T23:59:59.000Z

469

Dispersion modeling of ground-level area sources of particulate  

E-Print Network (OSTI)

The use of dispersion modeling by State Air Pollution hics. Regulatory Agencies (SAPRAS) is increasing. Dispersion modeling provides a quick and efficient means of determining the downwind impact of pollutant release from a source. The SAPRAS...

Fritz, Bradley Keith

2012-06-07T23:59:59.000Z

470

Study of the distribution of 226Ra in ground water near the uranium industry of Jharkhand, India  

Science Journals Connector (OSTI)

......levels of 226Ra observed in the ground water. Being a mineralised area, variation...226Ra activity concentration in ground water that is used for drinking purpose...Cretescu I. Characterisation and remediation of soils contaminated with uranium......

R. M. Tripathi; V. N. Jha; S. K. Sahoo; N. K. Sethy; A. K. Shukla; V. D. Puranik; H. S. Kushwaha

2012-01-01T23:59:59.000Z

471

Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) | Open  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal Resource Exploration And Definition Project

472

Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) | Open  

Open Energy Info (EERE)

Vapor (Warpinski, Et Al., 2002) Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal Resource Exploration And Definition Project

473

Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) | Open Energy  

Open Energy Info (EERE)

Warpinski, Et Al., 2002) Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal Resource Exploration And Definition Project

474

Updated: 1/25/11 Ground Breaking: June 9, 2003  

E-Print Network (OSTI)

Competitive Swimming Pool: · Long course: 50 meters; 10 lanes · Short course: 25 meters; 20 lanes · Depth varies from 7 to 10 feet Varsity Swimming Pool: · Three 1-meter, three 3-meter, seven springboards · 1, 3 Natatorium: Recreation Lap Pool: · Swimming: 25 yards; Six Lanes · Depth varies from 4 to 10 feet Class

Howat, Ian M.

475

Development of the prototype Munitions Case Moisture Meter, Model ORNL-1  

SciTech Connect

There is a great need for a rapid and simple means of determining the moisture content in combustible cartridge case (ccc) munitions. Previous studies have demonstrated that accumulation of moisture in ccc rounds, such as the M829, leads to softening of the case wall and weakening of the adhesive joint. Moisture in the ccc can lead to incomplete combustion of the case upon firing the round. Currently, there are no facile methods for measuring the moisture content. A prototype portable meter for non-destructive and rapid estimation of moisture in ccc has been developed. The Munitions Case Moisture Meter Model ORNL-1 demonstrates the feasibility of developing an instrument based on the moisture dependence of dielectric properties, to measure moisture in ccc munitions in storage and in the field. These instruments are simple, inexpensive, lightweight, portable, low-power battery operated, and intrinsically safe. They provide nondestructive, noninvasive, and rapid measurements. Calibration data for the prototype are not available at this time. Therefore, calibration of the meter and the development of a scale reading directly moisture content in munitions rounds could not be completed. These data will be supplied by the US Army from its tests of the meter with actual munitions. However, experimental results on empty cccs in laboratory conditions demonstrate satisfactory performance of the instrument. Additional work is needed to bring the prototype to its optimum usefulness and accuracy for field measurements. This includes: Calibration of the meter scale with full-up munitions; Data and evaluation procedures to adjust the performance of the meter for different environmental conditions such as temperature and humidity; and Studies of the dielectric properties of moist ccc materials, as a function of frequency and temperature, are needed for adjustment of the meter for optimal performance.

Agouridis, D.C.; Gayle, T.M.; Griest, W.H.

1993-02-24T23:59:59.000Z

476

Development of the prototype Munitions Case Moisture Meter, Model ORNL-1. Final report  

SciTech Connect

There is a great need for a rapid and simple means of determining the moisture content in combustible cartridge case (ccc) munitions. Previous studies have demonstrated that accumulation of moisture in ccc rounds, such as the M829, leads to softening of the case wall and weakening of the adhesive joint. Moisture in the ccc can lead to incomplete combustion of the case upon firing the round. Currently, there are no facile methods for measuring the moisture content. A prototype portable meter for non-destructive and rapid estimation of moisture in ccc has been developed. The Munitions Case Moisture Meter Model ORNL-1 demonstrates the feasibility of developing an instrument based on the moisture dependence of dielectric properties, to measure moisture in ccc munitions in storage and in the field. These instruments are simple, inexpensive, lightweight, portable, low-power battery operated, and intrinsically safe. They provide nondestructive, noninvasive, and rapid measurements. Calibration data for the prototype are not available at this time. Therefore, calibration of the meter and the development of a scale reading directly moisture content in munitions rounds could not be completed. These data will be supplied by the US Army from its tests of the meter with actual munitions. However, experimental results on empty cccs in laboratory conditions demonstrate satisfactory performance of the instrument. Additional work is needed to bring the prototype to its optimum usefulness and accuracy for field measurements. This includes: Calibration of the meter scale with full-up munitions; Data and evaluation procedures to adjust the performance of the meter for different environmental conditions such as temperature and humidity; and Studies of the dielectric properties of moist ccc materials, as a function of frequency and temperature, are needed for adjustment of the meter for optimal performance.

Agouridis, D.C.; Gayle, T.M.; Griest, W.H.

1993-02-24T23:59:59.000Z

477

Calibrating Pesticide Application Ground Equipment  

E-Print Network (OSTI)

This pocket-sized guide gives step-by-step instructions for calibrating ground sprayers. Tables provide instructions, examples and sample formulas for determining speed of application, flow rate and the amount of pesticide to add to the tank....

Shaw, Bryan W.

2000-07-05T23:59:59.000Z

478

Ground Water Management Regulations (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The rules and regulations apply to the management of the state's ground water resources. In addition, the Commissioner of Conservation has recommended that oil and gas operators with an interest...

479

[An improved, more reliable and more marketable version of the Automatic Metering System  

SciTech Connect

Texas Research Institute Austin, Inc. (TRI/Austin) was tasked by Letco International to evaluate its Automatic Metering System (AMS), a proportional controller for heat tracing cable. The original objectives were focused primarily on the reliability of the AMS controller. However, from the time of the original TRI/Austin proposal, the AMS device evolved beyond the prototype level into an established market product with sufficient operational experience and data that product reliability evaluation was not a significant test objective. The goals of this effort have been to determine the relative energy usage of the AMS proportional control compared to existing thermostatic control in a realistic freeze protection installation (low temperature test), to perform an accelerated life test for self limiting heat tracing cables to determine the service life impact of AMS control vs. thermostat control, and to perform a reliability analysis of the AMS device according to the 1986 edition of MIL-HDBK-217E [1] specifications. TRI/Austin designed and constructed a test set-up for conducting the low temperature test and the accelerated life test. A conceptual diagram of the test hardware is shown in Figure 1. The control computer was programmed to monitor and collect data from both tests in parallel, using the relay box and control circuitry fabricated at TRI/Austin. Test data and control commands were transmitted to and from the computer via standard parallel and serial interfaces. The AMS controller and relay box switched the power to the test cables, the commercial freezer, and the ALT chamber.

Patas, J.E.

1993-07-01T23:59:59.000Z

480

3rd International symposium on fluid flow measurement effects of acoustic noise on orifice meters  

SciTech Connect

It is known that in-pipe acoustic noise can cause errors in orifice plate metering. The international metering community voted this topic as the highest priority for further research during a {open_quotes}working{close_quotes} held at N.T.I.S. in 1983. Most published work to date has been concerned with periodic, low frequency noise or pulsations, as encountered on reciprocating compressor installations where errors or their side effects may be readily noticed. Many orifice metering locations are, however, subject to high frequency noise emanating from control valves and centrifugal compressors. High frequency in-pipe noise is seldom suspected as a source of metering error and consequently it is a neglected topic. Square root error, which stems form the non-linear flow-differential pressure relationship of an orifice plate, has been well researched for low frequencies but the work has not been extended to high frequencies. To investigate this topic, high pressure studies at the British Gas Bishop Auckland Test Facility were carried out with a noise source (a pressure drop across a ball valve) and a 600 mm 0.4 {beta} orifice meter. These studies identified the effect of high frequency acoustic noise on orifice plate accuracy.

Norman, R.; Graham, P.; Drew, W.A. [Engineering Research Station, Newcastle Upon Tyne (United Kingdom)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "ground level meters" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Design of a low-cost, high-resolution retrofit module for residential natural gas meters  

Science Journals Connector (OSTI)

Abstract There has been considerable interest in recent years in deploying smart meters in residential homes capable of distinguishing appliance-specific usage from whole-house consumption. Smart meters used in conjunction with algorithms that analyze usage data and other appliance attributes have been found to be a cost-effective and scalable approach. Based on this idea, the authors recently reported a laboratory-based solution for natural gas consisting of an encoder module retrofitted onto an existing residential gas meter. In this work, a detailed analysis of real gas consumption rates and patterns from common household appliances is performed and used to simulate the metering performance of a meter equipped with such an encoder module. The simulation is used to establish the optimal encoder resolution for a prototype encoder design that balances cost with performance. Improvements to the algorithms presented in the previous study to analyze the time-resolved data by deducing which appliance is using natural gas are also presented. The design, fabrication, and testing of a prototype encoder module is also presented.

M. Tewolde; J.C. Fritch; J.P. Longtin

2015-01-01T23:59:59.000Z

482

Analysis and methodology for measuring oxygen concentration in liquid sodium with a plugging meter  

SciTech Connect

Oxygen concentration in liquid sodium is a critical measurement in assessing the potential for corrosion damage in sodium-cooled fast reactors (SFRs). There has been little recent work on sodium reactors and oxygen detection. Thus, the technical expertise dealing with oxygen measurements within sodium is no longer readily available in the U.S. Two methods of oxygen detection that have been investigated are the plugging meter and the galvanic cell. One of the overall goals of the Univ. of Wisconsin's sodium research program is to develop an affordable, reliable galvanic cell oxygen sensor. Accordingly, attention must first be dedicated to a well-known standard known as a plugging meter. Therefore, a sodium loop has been constructed on campus in effort to develop the plugging meter technique and gain experience working with liquid metal. The loop contains both a galvanic cell test section and a plugging meter test section. Consistent plugging results have been achieved below 20 [wppm], and a detailed process for achieving effective plugging has been developed. This paper will focus both on an accurate methodology to obtain oxygen concentrations from a plugging meter, and on how to easily control the oxygen concentration of sodium in a test loop. Details of the design, materials, manufacturing, and operation will be presented. Data interpretation will also be discussed, since a modern discussion of plugging data interpretation does not currently exist. (authors)

Nollet, B. K.; Hvasta, M.; Anderson, M. [Univ. of Wisconsin-Madison, 1500 Engineering Dr., Madison, WI 53706 (United States)

2012-07-01T23:59:59.000Z

483

Performance of electric power meters and analyzers in adjustable-speed drive applications  

SciTech Connect

Electric adjustable-speed drives (ASDs) are increasingly used in heating, ventilating, and air-conditioning (HVAC) equipment due to the energy savings and comfort of operation they offer. Power electronic circuits that are employed in ASDs shape their input and output voltage and current waveforms, making them highly distorted from typical power-grid sinusoids. Accurate measurements of voltage, current, and power under nonsinusoidal conditions are essential for determining the efficiency of an HVAC unit and performing separation of losses between an ASD and an electric motor. That information is invaluable for HVAC equipment designers, manufacturers, and users. Three modern power meters and analyzers were tested to determine their accuracy with various nonsinusoidal waveforms applied. The meters were subjected to waveforms that are produced by the three most common ASD technologies used in air conditioners and heat pumps, namely, PWM induction, DC-brushless, and switched-reluctance drives. The tests were performed under field conditions and in a computer-controlled laboratory environment. The results obtained show that some meters can accurately measure electric power at the input to ASDs. However, the output power of ASDs for DC-brushless and switched-reluctance technology was not measured with acceptable accuracy by any of the tested meters. Possible reasons for meter inaccuracies and suggestions for performance improvement are given.

Czarkowski, D.; Domijan, A. Jr. [Univ. of Florida, Gainesville, FL (United States). Dept. of Electrical and Computer Engineering

1997-12-31T23:59:59.000Z

484

Wind: wind power density GIS data at 50m above ground and 1km resolution  

Open Energy Info (EERE)

7018 7018 Varnish cache server Wind: wind power density GIS data at 50m above ground and 1km resolution for Ghana from NREL Dataset Summary Description (Abstract): Raster GIS data, exported as BIL file, 50 m wind power density for Ghana. Note: BIL files can be converted to raster data in ArcInfo using the IMAGEGRID command. (Purpose): To provide information on the wind resource potential in Ghana. Values range from 0 to 620 meters. (Supplemental Information):***** Spatial Reference Information (Beg) *****Projection ParametersCoordinate System:Projection Transverse MercatorZunits W/m2Units MetersSpheroid: WGS84ParametersScale factor at central meridian: 1.0000Longitude of central meridian: -1 0 0.0Latitude of origin: 8 0 0.0False easting: 0False northing: 0Spatial InformationRaster:Number of Columns:

485

Questa Baseline and Pre-Mining Ground-Water Quality Investigation. 3. Historical Ground-Water  

E-Print Network (OSTI)

............................................................................................................................................................... 9 Mine history and ground-water development ....................................................................................................................................................... 11 Ground-water quality database.......................................................................................................................................................... 29 Compilation of complete database

486

Microsoft PowerPoint - 03.2010_Metering Billing MDM America.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

METERING BILLING/MDM AMERICA METERING BILLING/MDM AMERICA Back-up Generation Sources (BUGS) Prepared by Steve Pullins March 9, 2010 Metering, Billing/MDM America - San Diego, CA This material is based upon work supported by the Department of Energy under Award Number DE- Department of Energy under Award Number DE AC26-04NT41817 This presentation was prepared as an account of work sponsored by an agency of This presentation was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed or represents

487

Cost benefit analysis for the implementation of smart metering with pilot  

Open Energy Info (EERE)

benefit analysis for the implementation of smart metering with pilot benefit analysis for the implementation of smart metering with pilot project (Smart Grid Project) Jump to: navigation, search Project Name Cost benefit analysis for the implementation of smart metering with pilot project Country Slovakia Coordinates 48.669025°, 19.699024° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.669025,"lon":19.699024,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

488

Five Million Smart Meters Installed Nationwide is Just the Beginning of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Million Smart Meters Installed Nationwide is Just the Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We must have an efficient electricity infrastructure to compete in the global economy.

489

Five Million Smart Meters Installed Nationwide is Just the Beginning of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Million Smart Meters Installed Nationwide is Just the Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress June 13, 2011 - 1:55pm Addthis A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image A 21st Century Grid includes increasing the overall efficiency of our generating, transmission and distribution system to facilitate the growth of renewable energy sources. | Energy Department Image Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We must have an efficient electricity infrastructure to compete in the global economy.

490

"I'd Like to Check Out Two Books, One DVD, and One Electrical Meter,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"I'd Like to Check Out Two Books, One DVD, and One Electrical "I'd Like to Check Out Two Books, One DVD, and One Electrical Meter, Please." "I'd Like to Check Out Two Books, One DVD, and One Electrical Meter, Please." December 8, 2009 - 10:01am Addthis John Lippert Yesterday I wrote about my experience using a digital electrical meter at home. Today I'll discuss what I'm doing with promoting their use in my home town. According to one popular environmental Web site, there are a number of libraries providing free loan of these or similar devices, including: The Ottawa Public Library in Ottawa, Canada; the Brown County Library in Green Bay, Wisconsin; the Westport, Connecticut Public Library; hundreds of public libraries in Maine; and libraries in Gothenburg, Sweden. That sounded like a great idea, so I visited my local library to explore

491

Results mixed from pulsating flow tests of orifice-plate meters  

SciTech Connect

This paper reports that laboratory tests on several commercially available orifice-plate meters for use in pulsating flow indicate that none yields acceptable accuracy. These tests suggested, however, that if the objective of monitoring pulsating flow is to indicate or quantify pulsation magnitudes for comparisons, then at least two instruments are acceptable. Use of such meters, particularly in low flow rate gathering systems, can be a viable alternative to attempting to reduce the intensity (amplitude and frequency) of pulsation by expensive installation and maintenance of chokes and bottles. Phillips Petroleum Co. set out to find a meter that would be sensitive enough to measure pulsating hydrocarbon flows with acceptable accuracy using the orifice plate. Several orifice measurement systems were simultaneously investigated at the Southwest Research Institute, San Antonio (SwRI).

Arasi, J.A. (Phillips Petroleum Co., Tananger (Norway))

1992-10-05T23:59:59.000Z

492

Demand Response and Smart Metering Policy Actions Since the Energy Policy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Focus Area: Energy Efficiency, - Utility Topics: Socio-Economic Website: www.demandresponsesmartgrid.org/Resources/Documents/Final_NCEP_Report_ Equivalent URI: cleanenergysolutions.org/content/demand-response-and-smart-metering-po Language: English Policies: Regulations

493

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada  

E-Print Network (OSTI)

The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of the important hydrologic characteristics is a steep gradient on the ground-water table...

Lee, Si-Yong

2012-06-07T23:59:59.000Z

494

Advanced Metering Plan for Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings  

SciTech Connect

This updated Advanced Metering Plan for monitoring whole building energy use in Pacific Northwest National Laboratory (PNNL) EMS4 buildings on the PNNL campus has been prepared in accordance with the requirements of the Energy Policy Act of 2005 (EPAct 2005), Section 103, U.S. Department of Energy (DOE) Order 430.2B, and Metering Best Practices, A Guide to Achieving Utility Resource Efficiency, Federal Energy Management Program, October 2007 (Sullivan et al. 2007). The initial PNNL plan was developed in July 2007 (Olson 2007), updated in September 2008 (Olson et al. 2008), updated in September 2009 (Olson et al. 2009), and updated again in August 2010 (Olson et al. 2010).

Pope, Jason E.; Olson, Norman J.; Berman, Marc J.; Schielke, Dale R.

2011-08-17T23:59:59.000Z

495

Monitoring the Thermal Power of Nuclear Reactors with a Prototype Cubic Meter Antineutrino Detector  

E-Print Network (OSTI)

In this paper, we estimate how quickly and how precisely a reactor's operational status and thermal power can be monitored over hour to month time scales, using the antineutrino rate as measured by a cubic meter scale detector. Our results are obtained from a detector we have deployed and operated at 25 meter standoff from a reactor core. This prototype can detect a prompt reactor shutdown within five hours, and monitor relative thermal power to three percent within seven days. Monitoring of short-term power changes in this way may be useful in the context of International Atomic Energy Agency's (IAEA) Reactor Safeguards Regime, or other cooperative monitoring regimes.

A. Bernstein; N. S. Bowden; A. Misner; T. Palmer

2008-04-30T23:59:59.000Z

496

Currents and waters of the upper 1200 meters of the southwestern Gulf of Mexico  

E-Print Network (OSTI)

CURRENTS AND WATERS OF THE UPPER 1200 METERS OF THE SOUTHWESTERN GULF OF MEXICO A Thesis by ALBERTO MARIANO VAZQUEZ DE LA CERDA Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree... of MASTER OF SCIENCE August 1975 Major Subject: Oceanography CURRENTS AND WATERS OF THE UPPER 1200 METERS OF THE SOUTHWESTERN GULF OP MEXICO A Thesis by ALBERTO MARIANO VAZ0UEZ DE LA CERDA Approved as to style and content by: , , l (Chairman...

Vasquez de la Cerda, Alberto Mariano

1975-01-01T23:59:59.000Z

497

Thirty-meter digital elevation models (DEMs) produced by the U.S. Geological Survey (USGS) are widely available and com-  

E-Print Network (OSTI)

Abstract Thirty-meter digital elevation models (DEMs) produced by the U.S. Geological Survey (USGS, and slope classes gen- erated from sample 10-meter drainage-enforced (DE) DEMs and 30-meter DEMs. We found increasing resolution from 30 meters to 10 me- ters, particularly in flatter terrain; (2) streams and HU

498

Meter Eligibility Listing Procedure Updated 6/2/14 The California Solar Initiative (CSI) is for all market segments with the exception of New  

E-Print Network (OSTI)

Meter Eligibility Listing Procedure Updated 6/2/14 The California Solar on the accuracy of the meter there are two different routes to eligibility listing: Nonrevenue grade meters: 1. The meter must be selfcertified by the manufacturer to an accuracy of +/ 5%. 2. Fill out

499

Chapter 9, Metering Cross-Cutting Protocols: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Metering Cross- 9: Metering Cross- Cutting Protocols Dan Mort, ADM Associates, Inc. Subcontract Report NREL/SR-7A30-53827 April 2013 The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures 9 - 1 Chapter 9 - Table of Contents 1 Introduction ............................................................................................................................ 3 2 Metering Application and Considerations ............................................................................. 4 2.1 Identifying Scope ............................................................................................................. 4 2.2 Ensuring Precision and Verification ................................................................................ 4

500

Ground Magnetics | Open Energy Information  

Open Energy Info (EERE)

Ground Magnetics Ground Magnetics Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Magnetics Details Activities (15) Areas (12) Regions (0) NEPA(1) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Magnetic Techniques Parent Exploration Technique: Magnetic Techniques Information Provided by Technique Lithology: Presence of magnetic minerals such as magnetite. Stratigraphic/Structural: Mapping of basement structures, horst blocks, fault systems, fracture zones, dykes and intrusions. Hydrological: The circulation of hydrothermal fluid may impact the magnetic susceptibility of rocks. Thermal: Rocks lose their magnetic properties at the Curie temperature (580° C for magnetite) [1] and, upon cooling, remagnetize in the present magnetic field orientation. The Curie point depth in the subsurface may be determined in a magnetic survey to provide information about hydrothermal activity in a region.