Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Bed and bed-site reuse by western lowland gorillas (Gorilla g. gorilla) in Moukalaba-Doudou National Park, Gabon  

Science Journals Connector (OSTI)

In this paper we describe bed (nest) and bed-site reuse by western lowland gorillas (Gorilla g. gorilla...) in Moukalaba-Doudou National Park, south-eastern Gabon. During an eight-month study 44 bed...

Yuji Iwata; Chieko Ando

2007-01-01T23:59:59.000Z

2

On-Site Wastewater Treatment Systems: Evapotranspiration Bed  

E-Print Network [OSTI]

Two-compartment septic tank Loam soil Crushed stone Evapotranspiration bed Wick On-site wastewater treatment systems Evapotranspiration bed Bruce Lesikar Extension Agricultural Engineering Specialist The Texas A&M University System ET systems..., synthetic or concrete liner. A liner is required if the surrounding soil is very permeable, such as in sandy gravel or karst limestone. Unlined systems can be used in highly impermeable soils such as heavy clays. In unlined systems, wastewater is disposed...

Lesikar, Bruce J.

1999-09-01T23:59:59.000Z

3

Gasification of Coffee Grounds in Dual Fluidized Bed:? Performance Evaluation and Parametric Investigation  

Science Journals Connector (OSTI)

Gasification of Coffee Grounds in Dual Fluidized Bed:? Performance Evaluation and Parametric Investigation ... Ishikawajima-Harima Heavy Industries Co., Ltd. ... With a national technical program, we recently worked on converting this biomass waste into middle-caloric product gas. ...

Guangwen Xu; Takahiro Murakami; Toshiyuki Suda; Yoshiaki Matsuzawa; Hidehisa Tani

2006-10-28T23:59:59.000Z

4

Spectral Analysis of Thinning Beds Using Ground Penetrating Radar  

E-Print Network [OSTI]

to image internal dune structures. The results showed anomalous features at merging beds and contacts between interfaces. The results directly influence sedimentological and geomorphological interpretations of internal dune structure and can be used...

Francese, Renee Rose

2012-07-16T23:59:59.000Z

5

118-K-1 Burial Ground - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Receiving and Processing Facility Waste Sampling and Characterization Facility Waste Treatment Plant 118-K-1 Burial Ground Email Email Page | Print Print Page |Text Increase...

6

Hanford Site ground-water monitoring for 1994  

SciTech Connect (OSTI)

This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1994 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiologic and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1994 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1993 and June 1994. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal.

Dresel, P.E.; Thorne, P.D.; Luttrell, S.P. [and others

1995-08-01T23:59:59.000Z

7

ISG8-Ground Motion; Site Requirements and Investigations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ground Motion; Site Requirements and Investigations (WG5) Ground Motion; Site Requirements and Investigations (WG5) June 24 - 27, 2002 Bldg.281 Conventional Facilities Rm. (A. Seryi, T. Tauchi) Parallel Sessions: Working Groups: WG1: Parameters, Design, Instrumentation and Tuning WG2: Damping Rings and ATF WG3: RF Sources WG4:Structures WG5: Ground Motion; Site Requirements and Investigations Agenda, ISG8 WG5 Final Version Goal: The main goal is to try to establish requirements to a linear collider site and determine a set of criteria that would allow evaluating a particular site. Trip to California representative sites: Scheduled and happened on Friday, departure 6am. This was a full day event. (Fred Asiri and Jerry Aarons were the guides). Monday, June 24, 11:00-12:00 Initial discussion Monday (joint with WG1) 13:30-17:30, Bldg.212, Cascades room

8

Hanford Site environmental data for calendar year 1990 -- Ground water  

SciTech Connect (OSTI)

This report tabulates ground-water radiological and chemical data for calendar year 1990 by the Ground-Water Surveillance Project, reported Resource Conservation and Recovery Act (RCRA) Monitoring, and Operational Monitoring. The Ground-Water Surveillance Project is conducted by the Pacific Northwest Laboratory and the RCRA and Operational Monitoring Projects are conducted by the Westinghouse Hanford Company. This document supplements the reports Hanford Site Ground-Water Monitoring for 1990 (Evans et al. 1992) and mental Report for Calendar Year 1990 (Woodruff and Hanf 1991). The data listings provided here were generated from the Hanford Environmental Information System database.

Dresel, P.E.; Bates, D.J.; Merz, J.K.

1993-03-01T23:59:59.000Z

9

Hanford Site ground-water monitoring for 1993  

SciTech Connect (OSTI)

This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices.

Dresel, P.E.; Luttrell, S.P.; Evans, J.C. [and others

1994-09-01T23:59:59.000Z

10

MTI Ground Truth Collection Ivanpah Dry Lake Bed, California, May, July, and August 2002  

SciTech Connect (OSTI)

A multi-agency collaboration successfully completed a series of ground truth measurements at the Ivanpah Dry Lake bed during FY 2002. Four collection attempts were made: two in May, one in July, and one in August. The objective was to collect ground-based measurements and airborne data during Multispectral Thermal Imager satellite overpasses. The measurements were to aid in the calibration of the satellite data and in algorithm validation. The Remote Sensing Laboratory, Las Vegas, Nevada; the National Aeronautics and Space Administration; Los Alamos National Laboratory; and the University of Arizona participated in the effort. Field instrumentation included a sun photometer on loan from the University of Arizona and the Remote Sensing Laboratory's radiosonde weather balloon, weather station, thermal infrared radiometers, and spectral radiometer. In addition, three reflectance panels were deployed; certain tests used water baths set at two different temperatures. Local weather data as well as sky photography were collected. May presented several excellent days; however, it was later learned that tasking for the satellite was not available. A combination of cloud cover, wind, and dusty conditions limited useful data collections to two days, August 28 and 29. Despite less-than- ideal weather conditions, the data for the Multispectral Thermal Imager calibration were obtained. A unique set of circumstances also allowed data collection during overpasses of the LANDSAT7 and ASTER satellites.

David L. Hawley

2002-10-01T23:59:59.000Z

11

Demo of below ground site that once held the Plutonium Recycle...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Demo of below ground site that once held the Plutonium Recycle Test Reactor at Hanford Demo of below ground site that once held the Plutonium Recycle Test Reactor at Hanford...

12

HANFORD SITE ENVIRONMENTAL DATA FOR CALENDAR YEAR 1989 - GROUND WATER  

SciTech Connect (OSTI)

In a continuing effort for the U.S. Department of Energy, Pacific Northwest Laboratory (PNL) is conducting ground-water monitoring at the Hanford Site, near Richland, Washington. This document contains the data listing of monitoring results obtained by PNL and Westinghouse Hanford Company during the period January through December 1989. Samples taken during 1989 were analyzed and reported by United States Testing Company, Inc., Richland, Washington. The data listing contains all chemical results (above contractual reporting limits) and radiochemical results (for which the result is larger than two times the total error).

Bryce, R. W.; Gorst, W. R.

1990-12-01T23:59:59.000Z

13

Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space. 73 refs., 19 figs., 7 tabs.

Not Available

1988-12-01T23:59:59.000Z

14

Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming  

SciTech Connect (OSTI)

This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site.

Not Available

1994-09-01T23:59:59.000Z

15

Interim site characterization report and ground-water monitoring program for the Hanford site solid waste landfill  

SciTech Connect (OSTI)

Federal and state regulations governing the operation of landfills require utilization of ground-water monitoring systems to determine whether or not landfill operations impact ground water at the point of compliance (ground water beneath the perimeter of the facility). A detection-level ground-water monitoring system was designed, installed, and initiated at the Hanford Site Solid Waste Landfill (SWL). Chlorinated hydrocarbons were detected at the beginning of the ground-water monitoring program and continue to be detected more than 1 year later. The most probable source of the chlorinated hydrocarbons is washwater discharged to the SWL between 1985 and 1987. This is an interim report and includes data from the characterization work that was performed during well installation in 1987, such as field observations, sediment studies, and geophysical logging results, and data from analyses of ground-water samples collected in 1987 and 1988, such as field parameter measurements and chemical analyses. 38 refs., 27 figs., 8 tabs.

Fruland, R.M.; Hagan, R.A.; Cline, C.S.; Bates, D.J.; Evans, J.C.; Aaberg, R.L.

1989-07-01T23:59:59.000Z

16

5 CCR 1002-42 Site Specific Water Quality Standards for Ground...  

Open Energy Info (EERE)

Specific Water Quality Standards for Ground Water Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: 5 CCR 1002-42 Site Specific Water...

17

Ground water remediation at the Moab, Utah, USA, former uranium-ore processing site  

Science Journals Connector (OSTI)

Seepage from the Moab, Utah, USA, former uranium-ore processing site resulted in ammonia and uranium contamination of naturally occurring saline ground water in alluvium adjacent to the Colorado River. An interim...

Donald R. Metzler; Joseph D. Ritchey; Kent A. Bostick…

2008-01-01T23:59:59.000Z

18

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Broader source: Energy.gov (indexed) [DOE]

58 58 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites Final February 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick Rock Sites February 2003 Final Page iii Contents Page Acronyms and Abbreviations...........................................................................................................v Executive Summary...................................................................................................................... vii 1.0 Introduction.............................................................................................................................1

19

LS-4~ GROUND VIBRATION MEASUREMENTS NEAR THE SITE OF THE PROPOSED  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

~ ~ GROUND VIBRATION MEASUREMENTS NEAR THE SITE OF THE PROPOSED ANL LIGHT SYNCHROTRON RADIATION FACILITY by D.L. McCown and R. Bowen Geoscience and Engineering Energy and Environmental Systems Division January 23, 1986 SUMMARY LS-4'l D. L. McCown/R. Bowen January 23, 1986 GROmm VIBRATION MEASUREMENTS REAR. 'l'IIE SITE OF 'l'IIE PROPOSED ANL LIGHT SYNCHROTRON RADIATION FACILITY Ground surface vibration measurements were conducted near the site of the proposed Light Source Radiation Facility in December, 1985 and early January, 1986 during "busy" and "quiet" periods of site activity. The preliminary analysis of the measurements indicates that ground vibrations (in the vertical) observed at the site are usually at frequencies below 800 Hz.

20

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Broader source: Energy.gov (indexed) [DOE]

Impact Impact Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites AGENCY: U.S. DEP.4RTMENT OF ENERGY ACTIOK: FL&-DING OF NO SIGNIFICANT IMP-ACT (FONSI) SU$IM$RY: The U.S. Department of Energy (DOE) plans to implement ground lvater compliance strategies for two Uranium Mill Tailings Remedial Action (UMTR.4) Project sites near Slick Rock. Colorado. The purpose of the strategies is to comply with U.S. En\.ironmental Protection .Qency (EP.Aj ground n'ater standards defined in Title 40 Codr ~fF~d~w/ iieplutio?r.s (CFR) Part 192. and in so doing. protect human health and the en\.ironment. Ground water at the Slick Rock sites is contaminated with residual radioactive materials from hisTorica acti\,ities, associated with the processin of uranium ore, The planned action (~formeri>,.

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Ground-water levels and tritium concentrations at the Maxey Flats low-level radioactive waste disposal site near Morehead, Kentucky, June 1984 to April 1989  

SciTech Connect (OSTI)

The Maxey Flats disposal site, Kentucky encompasses about 280 acres near the edge of a flat-topped ridge. The ridge is underlain by fractured shale and sandstone beds of the Nancy Member and the Farmers Member of the Borden Formation of Mississippian age. Groundwater flow in the strata beneath the site occurs through fractures, and flow patterns are difficult to delineate. The potentiometric surface also is difficult to delineate because several saturated and unsaturated zones are present in the rocks. Generally, ground-water levels in wells intersecting permeable fractures fluctuated seasonally and were lowest from December through June and highest from July through November. Water levels in the disposal trenches fluctuations less than those in wells, and for most trenches the fluctuations were less than 0.5 foot. From June 1984 to April 1989, tritium concentrations in groundwater ranged from 0 to 2,402,200 picocuries/ml. The greatest and most variable tritium concentrations were in wells along the northwest side of the site. The major conduit of groundwater flow from the trenches in the northwestern part of the site is a fractured sandstone bed that forms the base of most trenches. Elsewhere along the site perimeter, elevated levels of tritium were not detected in wells, and mean tritium were not detected in wells, and mean tritium concentrations showed little change between 1986 and 1988.

Wilson, K.S.; Lyons, B.E. (Geological Survey, Reston, VA (United States))

1991-01-01T23:59:59.000Z

22

Ground-water monitoring compliance plan for the Hanford Site Solid Waste Landfill  

SciTech Connect (OSTI)

Washington state regulations required that solid waste landfill facilities have ground-water monitoring programs in place by May 27, 1987. This document describes the well locations, installation, characterization studies and sampling and analysis plan to be followed in implementing the ground-water monitoring program at the Hanford Site Solid Waste Landfill (SWL). It is based on Washington Administrative Code WAC 173-304-490. 11 refs., 19 figs., 4 tabs.

Fruland, R.M.

1986-10-01T23:59:59.000Z

23

CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE |  

Broader source: Energy.gov (indexed) [DOE]

CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE August 2, 2010 - 12:00pm Addthis A sheep’s foot roller compacts the tailings in the disposal cell. A sheep's foot roller compacts the tailings in the disposal cell. Moab, UT MILL TAILINGS REMOVAL Sixteen million tons of uranium mill tailings 80 feet high stood on the banks of the Colorado River near Moab in southeast Utah, as a legacy to the former ore-processing site that operated for nearly three decades beginning in the mid-1950s. That is until April 2009, when the U.S. Department of Energy began moving the tailings by rail to an engineered disposal cell constructed 30 miles north near Crescent Junction, Utah. The mill tailings,

24

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

25

Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 2, Appendices  

SciTech Connect (OSTI)

This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical & Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties.

Not Available

1993-03-18T23:59:59.000Z

26

Investigation of the Roosevelt Road Transmitter Site, Fort Richardson, Alaska, using ground penetrating radar  

SciTech Connect (OSTI)

The Roosevelt Road Transmitter Site is the location of a decommissioned bunker on Fort Richardson, near Anchorage, Alaska. The site was used from World War II to the Korean War as part of an Alaskan communications network. The bunker and support buildings were vandalized following its decommissioning in the mid-1960s, resulting in PCB contamination of the bunker and soils around the above-ground transmitter annex. CRREL conducted a ground-penetrating radar (GPR) investigation of the site in June 1996, at the request of the Directorate of Public Works on Fort Richardson. Nine transect lines were established, each being profiled with 100- and 400-MHz antennas. Both antennas systems defined the extent of the bunker and identified the presence of buried utilities. The 100-MHz antenna provided large-scale resolution of the bunker, limits of site excavation, and large stratigraphic horizons in the undisturbed sediments. The 400-MHz antenna provided finer resolution that allowed identification of steel reinforcement in the bunker ceiling, utility walls and floor, and the walls of the inner and outer bunker. High amplitude resonance and hyperbolas in the record characterize the response from the Transmitter Annex foundation, buried pipes, and utilities. The GPR survey shows its utility for detecting the extent of abandoned underground structures and identifying the extent of original ground excavations.

Hunter, L.E.; Delaney, A.J.; Lawson, D.E.

1999-03-01T23:59:59.000Z

27

Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1  

SciTech Connect (OSTI)

This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

Not Available

1994-08-01T23:59:59.000Z

28

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect (OSTI)

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

29

Environmental geophysics at Kings Creek Disposal Site and 30th Street Landfill, Aberdeen Proving Ground, Maryland  

SciTech Connect (OSTI)

Geophysical studies on the Bush River Peninsula in the Edgewood Area of Aberdeen Proving Ground, Maryland, delineate landfill areas and provide diagnostic signatures of the hydrogeologic framework and possible contaminant pathways. These studies indicate that, during the Pleistocene Epoch, alternating stands of high and low seal levels resulted in a complex pattern of shallow channel-fill deposits in the Kings Creek area. Ground-penetrating radar studies reveal a paleochannel greater than 50 ft deep, with a thalweg trending offshore in a southwest direction into Kings Creek. Onshore, the ground-penetrating radar data indicate a 35-ft-deep branch to the main channel, trending to the north-northwest directly beneath the 30th Street Landfill. Other branches are suspected to meet the offshore paleochannel in the wetlands south and east of the 30th Street Landfill. This paleochannel depositional system is environmentally significant because it may control the shallow groundwater flow regime beneath the site. Electromagnetic surveys have delineated the pre-fill lowland area currently occupied by the 30th Street Landfill. Magnetic and conductive anomalies outline surficial and buried debris throughout the study area. On the basis of geophysical data, large-scale dumping has not occurred north of the Kings Creek Disposal Site or east of the 30th Street Landfill.

Davies, B.E.; Miller, S.F.; McGinnis, L.D.; Daudt, C.R.; Thompson, M.D.; Stefanov, J.E.; Benson, M.A.; Padar, C.A.

1995-01-01T23:59:59.000Z

30

Performance Assessment Monitoring Plan for the Hanford Site Low-Level Burial Grounds  

SciTech Connect (OSTI)

The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal facility for low-level and mixed low-level wastes has been restricted to lined trenches and the Navy reactor-compartment trench only. Hence, as of July 2004, only the two lined trenches in burial ground 218-W-5 (trenches 31 and 34, see Appendix A) and the Navy reactor-compartment trench in burial ground 218 E 12B (trench 94) are allowed to receive waste. When the two lined trenches are filled, the LLBG will cease to operate except for reactor compartment disposal at trench 94. Remaining operational lifetime of the LLBG is dependent on waste volume disposal rates. Existing programs for air sampling and analyses and subsidence monitoring are currently adequate for performance assessment at the LLBG. The waste disposal authorization for the Hanford Site is based (in part) on the post-closure performance assessments for the LLBG. In order to maintain a useful link between operational monitoring (e.g., Resource Conservation and Recovery Act [RCRA], Comprehensive Environmental Response, Compensation, and Liability Act, and State Waste Discharge Permits), constituents, monitoring frequencies, and boundaries require regular review and comparison. The annual reports discussed here are the primary sources for these reviews. The pathways of interest are air and groundwater for both operational and post-closure conditions at the LLBG, with groundwater considered to be the most significant long-term exposure pathway. Constituents that contributed at least 0.1% of the total relative hazard were selected as target analytes for monitoring. These are technetium-99, uranium, and iodine-129. Because of its environmental unavailability, carbon 14 was removed from the list of constituents. Given the potential uncertainties in inventories at the 200 Area LLBG and the usefulness of tritium as a contaminant indicator, tritium will be monitored as a constituent of concern at all burial grounds. Preexisting contamination plumes in groundwater beneath low-level waste management areas are attributed to other past-practice liquid waste disposal sites. Groundwater and air will be sampled and analyzed for radiogenic components. Subsidence monitoring will also be performed on a regular basis. The existing near-facility and surveillance air monitoring programs are sufficient to satisfy the performance assessment monitoring. Groundwater monitoring will utilize the existing network of wells at the LLBG, and co-sampling with RCRA groundwater monitoring, to be sampled semiannually. Installation of additional wells is currently underway to replace wells that have gone dry.

None

2006-03-30T23:59:59.000Z

31

Ground truth measurements for validation of AIRS land surface temperature and emissivity products at the Southern Great Plains validation site  

Science Journals Connector (OSTI)

This paper presents results from a land use/land cover ground survey in the ARM/CART site region and investigates the applicability of the USGS land use/land cover database to...

Osborne, Brian J; Knuteson, Robert O; Revercomb, Henry E; Short, John F; Tobin, David C

32

DOE/EA-1388: Environmental Assessment of Ground Water Compliance at the Shiprock Uranium Mill Tailings Site (September 2001)  

Broader source: Energy.gov (indexed) [DOE]

388 388 Environmental Assessment of Ground Water Compliance at the Shiprock Uranium Mill Tailings Site Final September 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 This Page Intentionally Blank DOE Grand Junction Office EA of Ground Water Compliance at the Shiprock Site September 2001 Final Page iii Contents Page Acronyms and Abbreviations ........................................................................................................ vii Executive Summary ....................................................................................................................... ix 1.0 Introduction .............................................................................................................................1

33

Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

NONE

1996-03-01T23:59:59.000Z

34

A summary of ecological investigations at the burial ground complex, Savannah River Site - 1994  

SciTech Connect (OSTI)

This report summarizes the results of three ecological investigations that were conducted in 1994 at the Burial Ground Complex (BGC) at the Savannah River Site (SRS). The three topics of study included remote sensing, aquatic toxicity testing, and qualitative surveys of herpetofauna and small mammals. Interim reports from each investigation are included in the appendices (A, B, and C). The objectives of the remote sensing effort were to compile historical aerial photography of the BGC and to develop a land use/cover map of the complex using recent aerial imagery. The goal of the aquatic toxicity testing was to determine if surface waters were toxic to aquatic biota whereas the objectives of the vertebrate surveys were to identify the species diversity and relative abundances of amphibians, reptiles, and small mammals inhabiting the study area.

Friday, G.P.; Hartman, G.D.; Mackey, H.E. Jr.; Riley, R.S.; Roach, J.L.; Specht, W.L.; Westbury, H.M.; Wike, L.D.

1994-11-01T23:59:59.000Z

35

Site Considerations for Repowering With Advanced Circulating Pressurized Fluidized Bed Combustion (APFBC) from the L.V. Sutton Station Concept Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tonnemacher et al., Site Considerations for Repowering With APFBC from the L.V. Sutton Station Concept Assessment Tonnemacher et al., Site Considerations for Repowering With APFBC from the L.V. Sutton Station Concept Assessment paper 970562 Page 1 of 36 Site Considerations for Repowering with Advanced Circulating Pressurized Fluidized Bed Combustion (APFBC) from the L.V. Sutton Station Concept Assessment Gary C. Tonnemacher, P.E., and David C. Killen, P.E. Carolina Power & Light Company Raleigh, North Carolina Richard E. Weinstein, P.E., Harvey N. Goldstein, P.E., and Jay S. White Parsons Power Group Inc. Reading, Pennsylvania Robert W. Travers, P.E. U.S. Department of Energy Office of Fossil Energy / Germantown, Maryland electronic mail addresses/phone no. electronic mail addresses/phone no. Tonnemacher{ Gary.Tonnemacher@CPLC.COM 919 / 546-6091 Goldstein { Harvey_N_Goldstein@Parsons.COM

36

Ground-penetrating radar survey of the Maxey Flats Low-Level Nuclear Waste Disposal Site, Fleming County, Kentucky  

SciTech Connect (OSTI)

A ground-penetrating radar survey was conducted at the Maxey Flats Low-Level Nuclear Waste Disposal Site, Kentucky, to more accurately determine the location of burial trenches and pits, and to identify locations and depths of any prominent subsurface features. A geologic/electromagnetic model of the site was developed and utilized for analysis of the acquired data. Depths of penetration derived from radar records correlate well with those calculated from the model. A final interpretation of the radar data is presented.

Horton, K.A.; Morey, R.M.

1982-06-01T23:59:59.000Z

37

Comparison of the CALIPSO satellite and ground-based observations of cirrus clouds at the ARM TWP sites  

SciTech Connect (OSTI)

Statistics of ice cloud macrophysical and optical properties from the Cloud-Aerosol LIdar with Orthogonal Polarization (CALIOP) instrument on board the Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) satellite are compared with those from ground-based lidar observations over a 31 month period. Ground-based lidar observations are taken from the micropulse lidars (MPL) at the three Department of Energy Atmospheric Radiation Measurement (ARM) tropical western pacific (TWP) sites: Manus, Nauru and Darwin. CALIPSO observations show a larger cloud fraction at high altitudes while the ground-based MPLs show a larger cloud fraction at low altitudes. The difference in mean ice cloud top and base heights at the Manus and Nauru sites are all within 0.51 km, although differences are statistically significant. Mean ice cloud geometrical thickness agree to within 0.05 km at the Manus and Nauru sites. Larger differences exist at Darwin due to excessive degradation of the MPL output power during our sampling period. Both sets of observations show thicker clouds during the nighttime which may be real but could also be partially an artifact of the decreased signal-to-noise ratio during the daytime. The number of ice cloud layers per profile are also shown to be consistent after accounting for the difference in spatial resolution. For cloud optical depths, four different retrieval methods are compared, two for each set of observations. All products show that the majority of ice cloud optical depths ({approx}60%) fall below an optical depth of 0.2. For most comparisons all four retrievals agree to within the uncertainty intervals. We find that both CALIPSO retrievals agree best to ground-based optical depths when the lidar ratio in the latter is retrieved instead of set to a fixed value. Also thoroughly compared is the cloud properties for the subset of ice clouds which reside in the tropical tropopause layer (TTL).

Thorsen, Tyler J.; Fu, Q.; Comstock, Jennifer M.

2011-11-10T23:59:59.000Z

38

Site effects in parametric ground motion models for the GEM-PEER Global GMPEs Project  

E-Print Network [OSTI]

regimes and describe procedures for estimation of siteWe review estimation procedures for V s30 that utilizerelative efficacy of those procedures using a profile data

2012-01-01T23:59:59.000Z

39

Depleted uranium risk assessment for Jefferson Proving Ground using data from environmental monitoring and site characterization. Final report  

SciTech Connect (OSTI)

This report documents the third risk assessment completed for the depleted uranium (DU) munitions testing range at Jefferson Proving Ground (JPG), Indiana, for the U.S. Army Test and Evaluation command. Jefferson Proving Ground was closed in 1995 under the Base Realignment and Closure Act and the testing mission was moved to Yuma Proving Ground. As part of the closure of JPG, assessments of potential adverse health effects to humans and the ecosystem were conducted. This report integrates recent information obtained from site characterization surveys at JPG with environmental monitoring data collected from 1983 through 1994 during DU testing. Three exposure scenarios were evaluated for potential adverse effects to human health: an occasional use scenario and two farming scenarios. Human exposure was minimal from occasional use, but significant risk were predicted from the farming scenarios when contaminated groundwater was used by site occupants. The human health risk assessments do not consider the significant risk posed by accidents with unexploded ordnance. Exposures of white-tailed deer to DU were also estimated in this study, and exposure rates result in no significant increase in either toxicological or radiological risks. The results of this study indicate that remediation of the DU impact area would not substantially reduce already low risks to humans and the ecosystem, and that managed access to JPG is a reasonable model for future land use options.

Ebinger, M.H.; Hansen, W.R.

1996-10-01T23:59:59.000Z

40

Siting the industrial cemetery : new burial grounds and crematory for Braintree, MA  

E-Print Network [OSTI]

The contemporary urban condition has placed a great deal of stress upon American cemeteries. Many cemeteries, once sited at the edge of cities and towns, are now surrounded by urban sprawl and development of surrounding ...

Stump, Richard Edward

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

THE USE OF GROUND-PENETRATING RADAR FOR ARCHAEOLOGY: DETERMINING SITE FORMATION PROCESSES AND SUBSURFACE FEATURES ON TUTUILA ISLAND, AMERICAN SAMOA  

E-Print Network [OSTI]

, ceremonial mound (i.e. star mound) construction details were easily seen in radar profiles. Ground penetrating radar has the potential to yield significant details about such mounds, with no physical impact to the site....

Welch, Daniel

2006-07-11T23:59:59.000Z

42

Flow and transport model of the Savannah River Site Old Burial Grounds using Data Fusion modeling (DFM)  

SciTech Connect (OSTI)

The Data Fusion Modeling (DFM) approach has been used to develop a groundwater flow and transport model of the Old Burial Grounds (OBG) at the US Department of Energy`s Savannah River Site (SRS). The resulting DFM model was compared to an existing model that was calibrated via the typical trial-and-error method. The OBG was chosen because a substantial amount of hydrogeologic information is available, a FACT (derivative of VAM3DCG) flow and transport model of the site exists, and the calibration and numerics were challenging with standard approaches. The DFM flow model developed here is similar to the flow model by Flach et al. This allows comparison of the two flow models and validates the utility of DFM. The contaminant of interest for this study is tritium, because it is a geochemically conservative tracer that has been monitored along the seepline near the F-Area effluent and Fourmile Branch for several years.

NONE

1995-11-01T23:59:59.000Z

43

Summary of hydrogeologic controls on ground-water flow at the Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

The underground testing of nuclear devices has generated substantial volumes of radioactive and other chemical contaminants below ground at the Nevada Test Site (NTS). Many of the more radioactive contaminants are highly toxic and are known to persist in the environment for thousands of years. In response to concerns about potential health hazards, the US Department of Energy, under its Environmental Restoration Program, has made NTS the subject of a long-term investigation. Efforts will assess whether byproducts of underground testing pose a potential hazard to the health and safety of the public and, if necessary, will evaluate and implement steps to remediate any of the identified dangers. Ground-water flow is the primary mechanism by which contaminants can be transported significant distances away from the initial point of injection. Flow paths between contaminant sources and potential receptors are separated by remote areas that span tens of miles. The diversity and structural complexity of the rocks along these flow paths complicates the hydrology of the region. Although the hydrology has been studied in some detail, much still remains uncertain about flow rates and directions through the fractured-rock aquifers that transmit water great distances across this arid region. Unique to the hydrology of NTS are the effects of underground testing, which severely alter local rock characteristics and affect hydrologic conditions throughout the region. This report summarizes what is known and inferred about ground-water flow throughout the NTS region. The report identifies and updates what is known about some of the major controls on ground-water flow, highlights some of the uncertainties in the current understanding, and prioritizes some of the technical needs as related to the Environmental Restoration Program. 113 refs.

Laczniak, R.J.; Cole, J.C.; Sawyer, D.A.; Trudeau, D.A.

1996-07-01T23:59:59.000Z

44

Graphics-based site information management at Hanford TRU burial grounds  

SciTech Connect (OSTI)

The objective of the project described in this paper is to demonstrate the use of integrated computer graphics and database techniques in managing nuclear waste facilities. The graphics-based site information management system (SIMS) combines a three- dimensional graphic model of the facility with databases which describe the facility's components and waste inventory. The SIMS can create graphic visualization of any site data. The SIMS described here is being used by Westinghouse Hanford Company (WHC) as part of its transuranic (TRU) waste retrieval program at the Hanford Reservation. It is being used to manage an inventory of over 38,000 containers, to validate records, and to help visualize conceptual designs of waste retrieval operations.

Rod, S.R. (Pacific Northwest Lab., Washington, DC (United States))

1992-04-01T23:59:59.000Z

45

Graphics-based site information management at Hanford TRU burial grounds  

SciTech Connect (OSTI)

The objective of the project described in this paper is to demonstrate the use of integrated computer graphics and database techniques in managing nuclear waste facilities. The graphics-based site information management system (SIMS) combines a three- dimensional graphic model of the facility with databases which describe the facility`s components and waste inventory. The SIMS can create graphic visualization of any site data. The SIMS described here is being used by Westinghouse Hanford Company (WHC) as part of its transuranic (TRU) waste retrieval program at the Hanford Reservation. It is being used to manage an inventory of over 38,000 containers, to validate records, and to help visualize conceptual designs of waste retrieval operations.

Rod, S.R. [Pacific Northwest Lab., Washington, DC (United States)

1992-04-01T23:59:59.000Z

46

DOE/EA-1312: Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (September 1999)  

Broader source: Energy.gov (indexed) [DOE]

2 2 Rev. 0 Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) Final September 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy EA of Ground Water Compliance at the Grand Junction UMTRA Project Site DOE Grand Junction Office Page ii Final September 1999 Contents Executive Summary.........................................................................................................................v 1.0 Introduction...............................................................................................................................1 1.1 Grand Junction UMTRA Project Site Location and Description.........................................1

47

Geohydrology of the 218-W-5 Burial Ground, 200-West Area, Hanford Site  

SciTech Connect (OSTI)

Construction a disposal facility for solid, mixed low-level radioactive and hazardous wastes at the Hanford Site in southeastern Washington State (Figure 1) is planned. A site-specific performance assessment for each new disposal facility to ensure that wastes will be isolated from the environment is required. To demonstrate the adequacy of the facility for isolating the wastes, computer codes are used to simulate the physical processes that could cause the waste to migrate to underground water supplies or to the land's surface. The purpose of this report is provide a compilation and interpretation of geologic and hydrologic data available use in the performance assessment modeling. A variety of data are needed to model flow and transport from a solid-waste burial trench. These data include soil water content, soil moisture potential, saturated and unsaturated hydraulic conductivity, and phase mineralogy of the soils and sediments within the vadose zone. The hydrologic data that are critical for quantifying the water storage and transport properties for unsaturated soils require a characterization of the heterogeneities of various soil layers and the moisture characteristic curves for these layers. Hydraulic properties and mineralogic data for the saturated sediments are also important for modelling the flow and transport of wastes in the unconfined aquifer. This report begins with a discussion of the procedures and methods used to gather data both in the field and in the laboratory. This is followed by a summary of the geology, including the stratigraphic framework, lithofacies, and mineralogic/geochemical characteristics of the suprabasalt sediments. The hydrology of the region of the site is discussed next. In this discussion, the characteristics of the uppermost aquifer(s), unsaturated zone, and the various hydrogeologic units are presented. 54 refs., 39 figs., 11 tabs.

Bjornstad, B.N.

1990-05-01T23:59:59.000Z

48

DOE/EA-1313: Environmental Assessment of Ground Water Compliance at the Monument Valley, Arizona, Uranium Mill Tailings Site (03/22/05)  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA-1313 DOE/EA-1313 Rev. 0 Environmental Assessment of Ground Water Compliance at the Monument Valley, Arizona, Uranium Mill Tailings Site Final March 2005 Prepared by U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Document Number U0069700 This Page Intentionally Blank DOE Office of Legacy Management EA of Ground Water Compliance at the Monument Valley Site March 2005 Final Page iii Contents Page Acronyms and Abbreviations ....................................................................................................... vii Executive Summary.......................................................................................................................

49

Stable isotopes of hydrogen and oxygen in surface water and ground water at selected sites on or near the Idaho National Engineering Laboratory, Idaho  

SciTech Connect (OSTI)

Relative stable isotopic ratios for hydrogen and oxygen compared to standard mean ocean water are presented for water from 4 surface-water sites and 38 ground-water sites on or near the Idaho National Engineering Laboratory (INEL). The surface-water samples were collected monthly from March 1991 through April 1992 and after a storm event on June 18, 1992. The ground-water samples either were collected during 1991 or 1992. These data were collected as part of the US Geological Survey`s continuing hydrogeological investigations at the INEL. The relative isotopic ratios of hydrogen and oxygen are reported as delta {sup 2}H ({delta}{sup 2}H) and as delta {sup 18}O ({delta}{sup 18}O), respectively. The values of {delta}{sup 2}H and {delta}{sup 18}O in water from the four surface-water sites ranged from -143.0 to -122 and from -18.75 to -15.55, respectively. The values of {delta}{sup 2}H and {delta}{sup 18}O in water from the 38 ground-water sites ranged from -141.0 to -120.0 and from -18.55 to -14.95, respectively.

Ott, D.S.; Cecil, L.D.; Knobel, L.L.

1994-11-01T23:59:59.000Z

50

Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington  

Broader source: Energy.gov (indexed) [DOE]

05 05 Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington U.S. Department of Energy Washington, D.C. March 2002 DOE/EA-1405 U.S. Department of Energy Contents Environmental Assessment C-1 March 2002 CONTENTS PREFACE ....................................................................................................................................P-1 GLOSSARY ................................................................................................................................ G-1 SCIENTIFIC NOTATION CONVERSION CHART .................................................................... G-2 METRIC CONVERSION CHART...............................................................................................

51

Assessing environmental risk of the retired filter bed area, Battelle West Jefferson  

SciTech Connect (OSTI)

Initial investigations conducted by the U.S. Department of Energy, Chicago Operations Office, and by Argonne National Laboratory used seismic refraction profiling, electrical resistivity depth sounding, conductivity profiling, magnetic gradiometry, and ground-penetrating radar to study environmental geophysics in the area of the Battelle West Jefferson site`s radiologically contaminated retired filter beds. The investigators used a combination of nonintrusive technologies and innovative drilling techniques to assess environmental risk at the filter beds and to improve understanding of the geology of the Big Darby Creek floodplain. The geophysical investigation, which showed that the preferred groundwater pathway is associated with a laterally extensive deposit of silty sand to sand that is less than 12 ft deep in the floodplain area, also guided the location of cone penetrometer test sites and piezometer installation. Cone penetrometer testing was useful for comparing continuous logging data with surface geophysical data in establishing correlations among unconsolidated materials.

Miller, S.F.; Thompson, M.D.; Glennon, M.A. [and others

1997-04-01T23:59:59.000Z

52

Estimation of natural ground water recharge for the performance assessment of a low-level waste disposal facility at the Hanford Site  

SciTech Connect (OSTI)

In 1994, the Pacific Northwest Laboratory (PNL) initiated the Recharge Task, under the PNL Vitrification Technology Development (PVTD) project, to assist Westinghouse Hanford Company (WHC) in designing and assessing the performance of a low-level waste (LLW) disposal facility for the US Department of Energy (DOE). The Recharge Task was established to address the issue of ground water recharge in and around the LLW facility and throughout the Hanford Site as it affects the unconfined aquifer under the facility. The objectives of this report are to summarize the current knowledge of natural ground water recharge at the Hanford Site and to outline the work that must be completed in order to provide defensible estimates of recharge for use in the performance assessment of this LLW disposal facility. Recharge studies at the Hanford Site indicate that recharge rates are highly variable, ranging from nearly zero to greater than 100 mm/yr depending on precipitation, vegetative cover, and soil types. Coarse-textured soils without plants yielded the greatest recharge. Finer-textured soils, with or without plants, yielded the least. Lysimeters provided accurate, short-term measurements of recharge as well as water-balance data for the soil-atmosphere interface and root zone. Tracers provided estimates of longer-term average recharge rates in undisturbed settings. Numerical models demonstrated the sensitivity of recharge rates to different processes and forecast recharge rates for different conditions. All of these tools (lysimetry, tracers, and numerical models) are considered vital to the development of defensible estimates of natural ground water recharge rates for the performance assessment of a LLW disposal facility at the Hanford Site.

Rockhold, M.L.; Fayer, M.J.; Kincaid, C.T.; Gee, G.W.

1995-03-01T23:59:59.000Z

53

Estimation of the release and migration of lead through soils and groundwater at the Hanford Site 218-E-12B Burial Ground  

SciTech Connect (OSTI)

This study was performed to evaluate the potential for transport of lead from the Hanford Site 218-E-12B Burial Ground to the surrounding surface- and groundwater. Burial of metal components containing nickel alloy steel and lead at this location may eventually result in release of lead to the subsurface environment, including groundwater aquifers that may be used for domestic and agricultural purposes in the future and, ultimately, to the Columbia River. The rate at which lead is transported to downgradient locations depends on a complex set of factors, such as climate, soil and groundwater chemistry, and the geologic and hydrologic configuration of the subsurface region between the burial ground and a potential receptor location. The groundwater transport analysis was conducted using a one-dimensional screening model with a relatively conservative matrix of parameters obtained from the hydrogeologic and geochemical studies.

Rhoads, K.; Bjornstad, B.N.; Lewis, R.E.; Teel, S.S.; Cantrell, K.J.; Serne, R.J.; Smoot, J.L.; Kincaid, C.T.; Wurstner, S.K.

1992-10-01T23:59:59.000Z

54

Estimation of the release and migration of lead through soils and groundwater at the Hanford Site 218-E-12B Burial Ground. Volume 1, Final report  

SciTech Connect (OSTI)

This study was performed to evaluate the potential for transport of lead from the Hanford Site 218-E-12B Burial Ground to the surrounding surface- and groundwater. Burial of metal components containing nickel alloy steel and lead at this location may eventually result in release of lead to the subsurface environment, including groundwater aquifers that may be used for domestic and agricultural purposes in the future and, ultimately, to the Columbia River. The rate at which lead is transported to downgradient locations depends on a complex set of factors, such as climate, soil and groundwater chemistry, and the geologic and hydrologic configuration of the subsurface region between the burial ground and a potential receptor location. The groundwater transport analysis was conducted using a one-dimensional screening model with a relatively conservative matrix of parameters obtained from the hydrogeologic and geochemical studies.

Rhoads, K.; Bjornstad, B.N.; Lewis, R.E.; Teel, S.S.; Cantrell, K.J.; Serne, R.J.; Smoot, J.L.; Kincaid, C.T.; Wurstner, S.K.

1992-10-01T23:59:59.000Z

55

Influence of site conditions on near-source high-frequency ground motion: case studies from earthquakes in Imperial Valley, CA. , Coalinga, CA. , and Miramichi, Canada  

SciTech Connect (OSTI)

In this thesis, three recent earthquake datasets are analyzed in which local recording-site geology strongly modifies near-source ground motion in the 1-30 Hz band. Site effects in this frequency band complicate seismic-source observations, such as estimation of earthquake source parameters and high-frequency discrimination between earthquakes and explosions, and seismic-hazard predictions for components of large engineering systems. The goals of this work are to examine the details of site amplification, and, in the process, to assess how site effects might be quantified and incorporated into seismology and engineering practice. The Imperial Valley study is motivated by a remarkable 1.7 g peak vertical-component acceleration recorded at station 6 of the El Centro accelerograph array during the 15 October 1979 Imperial Valley, Ca., earthquake. Analysis of geotechnical data suggests a plausible amplification mechanism: P-wave resonance related to water saturation in shallow sediments at station 6. The Coalinga dataset consists of seismograms from 26 aftershocks of the 2 May 1983 Coalinga, Ca., earthquake. Average horizontal-component ground motion is amplified on alluvium at downtown Coalinga relative to nearby rock by a factor of 3-4 at frequencies up to 5-15 Hz. Amplification apparently trades off with attenuation on alluvium at high frequencies. The Miramichi dataset consists of seismograms from 40 aftershocks of the 9 January 1982 Miramichi, New Brunswick, Canada, earthquake. Source-parameter measurements are influenced by strong site effects at frequencies greater than 15Hz, due to resonance in shallow layers of glacial till over bedrock.

Mueller, C.S.

1987-01-01T23:59:59.000Z

56

Effects of land disposal of municipal sewage sludge on soil, streambed sediment, and ground- and surface-water quality at a site near Denver, Colorado  

SciTech Connect (OSTI)

The report describes the effects of burial and land application of municipal sewage sludge on soil and streambed sediment and water quality in the underlying aquifers and surface water within and around the Lowry sewage-sludge-disposal area. The existing ground-water observation-well network at the disposal area was expanded for the study. Surface-water-sampling sites were selected so that runoff could be sampled from intense rainstorms or snowmelt. The sampling frequency for ground-water and surface-water runoff was changed from yearly to quarterly, and soil samples were collected. Four years of data were collected from 1984 to 1987 during the expanded monitoring program at the Lowry sewage-sludge-disposal area. These data, in addition to the data collected by the U.S. Geological Survey from 1981 to 1983, were used to determine effects of sewage-sludge-disposal on soil and streambed sediment and surface- and ground-water quality at the disposal area.

Gaggiani, N.G.

1991-01-01T23:59:59.000Z

57

Bed material agglomeration during fluidized bed combustion  

SciTech Connect (OSTI)

The purpose of this project is to determine the physical and chemical reactions which led to the undesired agglomeration of bed material during fluidized bed combustion and to relate these reactions to specific causes. Survey of industrial-scale fluidized bed combustors is being conducted to determine the occurrence of bed agglomeration and the circumstances under which agglomeration took place. This task should be finished by the end of February. Samples of bed material, agglomerate material, and boiler deposits are being requested from boiler operators as part of the survey. Once received, these sample will be analyzed to determine chemical and mineralogic composition. The bulk chemical determination will be performed using x-ray fluorescence and inductively coupled plasma-optical emission (ICP). Mineralogy will be detected by x-ray diffraction (XRD). Chemical and mineral reactions will be determined by scanning electron microscopy, optical microscopy, and electron microprobe.

Brown, R.C.; Dawson, M.R.; Noble, S.

1993-02-01T23:59:59.000Z

58

Bed material agglomeration during fluidized bed combustion. Final report  

SciTech Connect (OSTI)

The purpose of this project is to determine the physical and chemical reactions which lead to the undesired agglomeration of bed material during fluidized bed combustion of coal and to relate these reactions to specific causes. A survey of agglomeration and deposit formation in industrial fluidized bed combustors (FBCs) indicate that at least five boilers were experiencing some form of bed material agglomeration. Deposit formation was reported at nine sites with deposits most commonly at coal feed locations and in cyclones. Other deposit locations included side walls and return loops. Three general types of mineralogic reactions were observed to occur in the agglomerates and deposits. Although alkalies may play a role with some {open_quotes}high alkali{close_quotes} lignites, we found agglomeration was initiated due to fluxing reactions between iron (II) from pyrites and aluminosilicates from clays. This is indicated by the high amounts of iron, silica, and alumina in the agglomerates and the mineralogy of the agglomerates. Agglomeration likely originated in the dense phase of the FBC bed within the volatile plume which forms when coal is introduced to the boiler. Secondary mineral reactions appear to occur after the agglomerates have formed and tend to strengthen the agglomerates. When calcium is present in high amounts, most of the minerals in the resulting deposits are in the melilite group (gehlenite, melilite, and akermanite) and pyroxene group (diopside and augite). During these solid-phase reactions, the temperature of formation of the melilite minerals can be lowered by a reduction of the partial pressure of CO{sub 2} (Diopside + Calcite {r_arrow}Akermanite).

Brown, R.C.; Dawson, M.R.; Smeenk, J.L.

1996-01-01T23:59:59.000Z

59

Ground-water levels and tritium concentrations at the Maxey Flats low-level radioactive-waste-disposal site near Morehead, Kentucky, June 1984 to April 1989. Water - resources investigation  

SciTech Connect (OSTI)

The report, one in a series of reports by the USGS, summarizes ground-water level and tritium data that were collected by the USGS from June 1984 through April 1989. The report also describes the occurrence and distribution of tritium in water from selected wells. Data for ground-water levels in wells and disposal tranches and the concentrations of tritium in water from monitoring wells at the site are presented. Precipitation data were collected in conjunction with the water-level data to relate precipitation to ground-water recharge. Specific conductance data, routinely determined for ground-water samples, also were collected to compare changes in specific conductance to changes in tritium concentrations. All data are stored locally on the U.S. Geological Survey's National Water Information System (NWIS).

Wilson, K.S.; Lyons, B.E.

1991-01-01T23:59:59.000Z

60

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Substation grounding.  

E-Print Network [OSTI]

??Designing a proper substation grounding system is quite complicating. Many parameters affect its design. In order for a grounding design to be safe, it needs… (more)

Baleva, Inna

2012-01-01T23:59:59.000Z

62

Measurements of volatile organic compounds at a suburban ground site (T1) in Mexico City during the MILAGRO 2006 campaign: Measurement comparison, emission ratios, and source attribution  

SciTech Connect (OSTI)

Volatile organic compound (VOC) mixing ratios were measured with two different instruments at the T1 ground site in Mexico City during the Megacity Initiative: Local and Global Research Observations (MILAGRO) campaign in March of 2006. A gas chromatograph with flame ionization detector (GC-FID) quantified 18 light alkanes, alkenes and acetylene while a proton-transfer-reaction ion-trap mass spectrometer (PIT-MS) quantified 12 VOC species including oxygenated VOCs (OVOCs) and aromatics. A GC separation system was used in conjunction with the PIT-MS (GC-PIT-MS) to evaluate PIT-MS measurements and to aid in the identification of unknown VOCs. The VOC measurements are also compared to simultaneous canister samples and to two independent proton-transfer-reaction mass spectrometers (PTR-MS) deployed on a mobile and an airborne platform during MILAGRO. VOC diurnal cycles demonstrate the large influence of vehicle traffic and liquid propane gas (LPG) emissions during the night and photochemical processing during the afternoon. Emission ratios for VOCs and OVOCs relative to CO are derived from early-morning measurements. Average emission ratios for non-oxygenated species relative to CO are on average a factor of {approx}2 higher than measured for US cities. Emission ratios for OVOCs are estimated and compared to literature values the northeastern US and to tunnel studies in California. Positive matrix factorization analysis (PMF) is used to provide insight into VOC sources and processing. Three PMF factors were distinguished by the analysis including the emissions from vehicles, the use of liquid propane gas and the production of secondary VOCs + long-lived species. Emission ratios to CO calculated from the results of PMF analysis are compared to emission ratios calculated directly from measurements. The total PIT-MS signal is summed to estimate the fraction of identified versus unidentified VOC species.

Bon, D.M.; Springston, S.; M.Ulbrich, I.; de Gouw, J. A.; Warneke, C.; Kuster, W. C.; Alexander, M. L.; Baker, A.; Beyersdorf, A. J.; Blake, D.; Fall, R.; Jimenez, J. L., Herndon, S. C.; Huey, L. G.; Knighton, W. B.; Ortega, J.; Vargas, O.

2011-03-16T23:59:59.000Z

63

Characterization of organic-rich colloids from surface and ground waters at the actinide-contaminated Rocky Flats Environmental Technology Site (RFETS), Colorado, USA  

Science Journals Connector (OSTI)

Colloids, i.e. nanoparticles and macromolecules, play an important role in the environmental dispersion of actinides. Thus, colloids (3 kDa–0.5 ?m) were collected and purified from three different environments, i.e. surface water, pond water and near-surface ground water at the Rocky Flats Environmental Technology Site, Colorado, where elevated actinide concentrations had previously been documented. Their chemical composition was determined in order to better understand their role in actinide migration. All three types of colloid samples were found to be similar in chemical composition, with a higher percentage of organic carbon, OC (5–18%), than any other measured component, and only small amounts of Si, Mn, Al, and Fe (1.5% or below). Analytically determined components account for 40–56% of the colloidal matter, with water likely making up the difference. Transmission electron microscopy (TEM) images of colloidal material from all three sample types indicate the presence of cellulose or chitin, likely from plant (terrestrial and/or aquatic) material. Other major components include humic acid type particles, with only small amounts (<5%) of mineral particles. Our findings of colloids high in organic and low in inorganic matter content agree with previously reported results on Pu(IV) associated with an acidic natural macromolecular organic compound that also contains small amounts of Fe. Pu/OC and Fe/OC ratios both showed a steady decrease from surface water to pond water to groundwater, with a more marked decrease in the Fe/OC ratio, but no significant change in overall colloidal organic carbon (COC) concentrations.

Kimberly A. Roberts; Peter H. Santschi; Gary G. Leppard; M.Marcia West

2004-01-01T23:59:59.000Z

64

17 - Fluidized bed gasification  

Science Journals Connector (OSTI)

Abstract: The chapter describes the state-of-the-art of fluidized bed gasification of solid fuels, starting from the key role played by hydrodynamics, and its strong correlation with physical and chemical phenomena of the process and operating performance parameters of the reactor. The possible configurations of fluidized bed gasification plants are also assessed, and an analysis of the main methods for syngas cleaning is reported. Finally, the chapter describes some of the most interesting commercial experiences. The analysis indicates that the gasification of biomass and also of municipal and industrial solid wastes appear to be the most interesting sectors for the industrial development and utilization of fluidized bed gasifiers.

U. Arena

2013-01-01T23:59:59.000Z

65

Packed Bed Combustion: An Overview  

E-Print Network [OSTI]

;Packed Bed Combustion - University of Ottawa - CICS 2005 fuel fuel feed air products air fuel Retort) products Underfeed Combustion fuel feed air #12;Packed Bed Combustion - University of Ottawa - CICS 2005 required #12;Packed Bed Combustion - University of Ottawa - CICS 2005 Overfeed Bed fuel motion products air

Hallett, William L.H.

66

Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site  

SciTech Connect (OSTI)

The U. S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

N /A

1999-12-08T23:59:59.000Z

67

Chlorofluorocarbons, Sulfur Hexafluoride, and Dissolved Permanent Gases in Ground Water from Selected Sites In and Near the Idaho National Engineering and Environmental Laboratory, Idaho, 1994 - 1997  

SciTech Connect (OSTI)

From July 1994 through May 1997, the U.S. Geological Survey, in cooperations with the Department of Energy, sampled 86 wells completed in the Snake River Plain aquifer at and near the Idaho National Engineering and Environmental Laboratory (INEEL). The wells were sampled for a variety of constituents including one- and two-carbon halocarbons. Concentrations of dichlorodifluoromethane (CFC-12), trichlorofluoromethane (CFC-11), and trichlorotrifluororoethane (CFC-113) were determined. The data will be used to evaluate the ages of ground waters at INEEL. The ages of the ground water will be used to determine recharge rates, residence time, and travel time of water in the Snake River Plain aquifer in and near INEEL. The chromatograms of 139 ground waters are presented showing a large number of halomethanes, haloethanes, and haloethenes present in the ground waters underlying the INEEL. The chromatograms can be used to qualitatively evaluate a large number of contaminants at parts per trillion to parts per billion concentrations. The data can be used to study temporal and spatial distribution of contaminants in the Snake River Plain aquifer. Representative compressed chromatograms for all ground waters sampled in this study are available on two 3.5-inch high density computer disks. The data and the program required to decompress the data can be obtained from the U.S. Geological Survey office at Idaho Falls, Idaho. Sulfur hexafluoride (SF6) concentrations were measured in selected wells to determine the feasibility of using this environmental tracer as an age dating tool of ground water. Concentrations of dissolved nitrogen, argon, carbon dioxide, oxygen, and methane were measured in 79 ground waters. Concentrations of dissolved permanent gases are tabulated and will be used to evaluate the temperature of recharge of ground water in and near the INEEL.

Busenberg, E.; Plummer, L.N.; Bartholomay, R.C.; Wayland, J.E.

1998-08-01T23:59:59.000Z

68

Hanford Site Celebrates National Native American Heritage Month...  

Office of Environmental Management (EM)

handle obsidian, a naturally occurring volcanic glass, which is part of a simulated fire hearth at the cultural test beds site. Hanford Site, Tribes Raise Awareness of...

69

Ground Water Ground Sky Sky Water Vegetation Ground Vegetation Water  

E-Print Network [OSTI]

Bear Snow Vegetation RhinoWater Vegetation Ground Water Ground Sky Sky Rhino Water Vegetation Ground Vegetation Water Rhino Water Vegetation Ground Rhino Water Rhino Water Ground Ground Vegetation Water Rhino Vegetation Rhino Vegetation Ground Rhino Vegetation Ground Sky Rhino Vegetation Ground Sky

Chen, Tsuhan

70

Transportation Safeguards & Security Test Bed (TSSTB) | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transportation Safeguards and Security Test Bed May 30, 2013 The Transportation Safeguards and Security Test Bed consists of a test-bed vehicle and a monitoringlaboratorytraining...

71

Tenth annual fluidized bed conference  

SciTech Connect (OSTI)

The proceedings of the Tenth Annual Fluidized Bed Conference is presented. The Conference was held November 14-15, 1994 in Jacksonville, FL and covered such topics as: opportunity fuels, the fluid bed market, bubbling fluid bed retrofitting, waste fuel-based circulating fluidized-bed project, construction permits for major air pollution sources, fluidized bed residues, uses for fluidized bed combustion ash, ash pelletization, sorbents for FBC applications, refractory maintenance, and petroleum coke. A separate abstract and indexing have been prepared for each paper for inclusion in the Energy Science and Technology Database.

NONE

1994-12-31T23:59:59.000Z

72

Staged fluidized bed  

DOE Patents [OSTI]

The invention relates to oil shale retorting and more particularly to staged fluidized bed oil shale retorting. Method and apparatus are disclosed for narrowing the distribution of residence times of any size particle and equalizing the residence times of large and small particles in fluidized beds. Particles are moved up one fluidized column and down a second fluidized column with the relative heights selected to equalize residence times of large and small particles. Additional pairs of columns are staged to narrow the distribution of residence times and provide complete processing of the material.

Mallon, R.G.

1983-05-13T23:59:59.000Z

73

Fluidized Bed Fuel Cell Electrodes  

Science Journals Connector (OSTI)

... smoothed the electrolyte flow through the bed. The mesh acted as bed support and electrical contactor to the beads. In the case of the hydrogen peroxide electrode the nickel mesh ... at the top 'of the bed for the hydrogen peroxide electrode and close to the contactor for the methanol electrode. In both cases polarization measurements were carried out at 20 ...

T. BERENT; I. FELLS; R. MASON

1969-09-06T23:59:59.000Z

74

EPA - Ground Water Discharges (EPA's Underground Injection Control...  

Open Energy Info (EERE)

EPA - Ground Water Discharges (EPA's Underground Injection Control Program) webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Ground Water...

75

Gas fluidized-bed stirred media mill  

DOE Patents [OSTI]

A gas fluidized-bed stirred media mill is provided for comminuting solid ticles. The mill includes a housing enclosing a porous fluidizing gas diffuser plate, a baffled rotor and stator, a hollow drive shaft with lateral vents, and baffled gas exhaust exit ports. In operation, fluidizing gas is forced through the mill, fluidizing the raw material and milling media. The rotating rotor, stator and milling media comminute the raw material to be ground. Small entrained particles may be carried from the mill by the gas through the exit ports when the particles reach a very fine size.

Sadler, III, Leon Y. (Tuscaloosa, AL)

1997-01-01T23:59:59.000Z

76

Bed drain cover assembly for a fluidized bed  

DOE Patents [OSTI]

A loose fitting movable cover plate (36), suitable for the severe service encountered in a fluidized bed combustor (10), restricts the flow of solids into the combustor drain lines (30) during shutdown of the bed. This cover makes it possible to empty spent solids from the bed drain lines which would otherwise plug the piping between the drain and the downstream metering device. This enables use of multiple drain lines each with a separate metering device for the control of solids flow rate.

Comparato, Joseph R. (Bloomfield, CT); Jacobs, Martin (Hartford, CT)

1982-01-01T23:59:59.000Z

77

Numerical simulation of ground-water flow in the Culebra dolomite at the Waste Isolation Pilot Plant (WIPP) site: Second interim report  

SciTech Connect (OSTI)

This hydrogeologic modeling study has been performed as part of the regional hydrologic characterization of the Waste Isolation Pilot Plant (WIPP) Site in southeastern New Mexico. The study resulted in an estimation of the transmissivity distrubution, hydraulic potentials, flow field, and fluid densities in the Culebra Dolomite Member of the Permian Rustler Formation at the WIPP site. The three-dimensional finite-difference code SWIFT-II was employed for the numerical modeling, using variable-fluid-density and a single-porosity formulation. The modeled area includes and extends beyond the WIPP controlled zone (Zone 3). The work performed consisted of modeling the hydrogeology of the Culebra using two approaches: (1) steady-state modeling to develop the best estimate of the undisturbed head distribution, i.e., of the situation before sinking if the WIPP shafts, which began in 1981; and (2) superimposed transient modeling of local hydrologic responses to excavation of the three WIPP shafts at the center of the WIPP site, as well as to various well tests. Boundary conditions (prescribed constant fluid pressures and densities) were estimated using hydraulic-head and fluid-density data obtained from about 40 wells at and near the WIPP site. The transient modeling used the calculated steady-state freshwater heads as initial conditions. 107 refs., 112 figs., 22 tabs.

LaVenue, A.M.; Haug, A.; Kelley, V.A.

1988-03-01T23:59:59.000Z

78

Hydrogeologic investigation of the Maxey Flats radioactive waste burial site, Fleming County, Kentucky  

SciTech Connect (OSTI)

Part of a hilltop named Maxey Flats was used as a commercial radioactive waste burial site from 1963 to 1977. The hill is about 9 miles from the city of Morehead. The climate of the area is humid, with normal annual precipitation 44.30 in. for the period 1941 through 1970. Most of the 47 burial trenches on the site are completed in weathered shale. They are covered with clay and crushed shale, but water infiltrates the covers and accumulates in the waste. The contaminated trench water is later removed and evaporated. Assuming water in trenches would not overflow onto the ground surface, flow through fractured rocks would be the principal means of contaminated-water transport if trench water were to move from the burial site. The bases of most trenches consist of a 1.5-ft-thick sandstone bed, at a depth of about 25 ft below ground level. Radionuclides have moved laterally through fractures in the bed as much as 270 feet from the nearest burial trench. Rocks underlying the burial site are of Mississippian, Devonian, and Silurian age, about 80% of which are shale. The bedrock has poor water-transmitting capability, and virtually all flow is through fractures. The spacing between most fractures is several feet, although it ranges from a few inches to more than 100 ft. Most fractures terminate, or are offset, at bedding planes. The ground-water system is therefore very nonuniform, and more permeable in the horizontal direction. At least eight hydrologic units underlie the burial site.

Zehner, H.H.

1983-01-01T23:59:59.000Z

79

Coal Bed Methane Primer  

SciTech Connect (OSTI)

During the second half of the 1990's Coal Bed Methane (CBM) production increased dramatically nationwide to represent a significant new source of income and natural gas for many independent and established producers. Matching these soaring production rates during this period was a heightened public awareness of environmental concerns. These concerns left unexplained and under-addressed have created a significant growth in public involvement generating literally thousands of unfocused project comments for various regional NEPA efforts resulting in the delayed development of public and fee lands. The accelerating interest in CBM development coupled to the growth in public involvement has prompted the conceptualization of this project for the development of a CBM Primer. The Primer is designed to serve as a summary document, which introduces and encapsulates information pertinent to the development of Coal Bed Methane (CBM), including focused discussions of coal deposits, methane as a natural formed gas, split mineral estates, development techniques, operational issues, producing methods, applicable regulatory frameworks, land and resource management, mitigation measures, preparation of project plans, data availability, Indian Trust issues and relevant environmental technologies. An important aspect of gaining access to federal, state, tribal, or fee lands involves education of a broad array of stakeholders, including land and mineral owners, regulators, conservationists, tribal governments, special interest groups, and numerous others that could be impacted by the development of coal bed methane. Perhaps the most crucial aspect of successfully developing CBM resources is stakeholder education. Currently, an inconsistent picture of CBM exists. There is a significant lack of understanding on the parts of nearly all stakeholders, including industry, government, special interest groups, and land owners. It is envisioned the Primer would being used by a variety of stakeholders to present a consistent and complete synopsis of the key issues involved with CBM. In light of the numerous CBM NEPA documents under development this Primer could be used to support various public scoping meetings and required public hearings throughout the Western States in the coming years.

Dan Arthur; Bruce Langhus; Jon Seekins

2005-05-25T23:59:59.000Z

80

Fluidized bed boiler feed system  

DOE Patents [OSTI]

A fluidized bed boiler feed system for the combustion of pulverized coal. Coal is first screened to separate large from small particles. Large particles of coal are fed directly to the top of the fluidized bed while fine particles are first mixed with recycled char, preheated, and then fed into the interior of the fluidized bed to promote char burnout and to avoid elutriation and carryover.

Jones, Brian C. (Windsor, CT)

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Hydrogeologic properties and ground-water chemistry of the Rattlesnake Ridge interbed at well 699-25-80 (DB-14) Hanford Site  

SciTech Connect (OSTI)

Offsite migration studies were conducted to characterize the hydraulic properties and groundwater chemistry of confined aquifer systems within the Hanford Site. These studies support the recommendations in ERDA-1538 to provide input for hydrologic modeling of groundwater flow within the Hanford Site, to afford information concerning possible contamination of underlying confined aquifer systems and to make the results available to the public. This report presents analytical results and aquifer test procedures used in characterizing the Rattlesnake Ridge interbed at well 699-25-80. The overall close association in groundwater chemistries and presence of elevated nitrate levels suggest that the Rattlesnake Ridge interbed may be locally in communication with the overlying unconfined aquifer system. Other physical evidence which indicates a potential local communication with the unconfined aquifer system includes: favorable stratigraphic position; absence of the confining Elephant Mountain basalt in surrounding areas; and intersection of a recharge boundary during aquifer tests of well 699-25-80.

Spane, F.A. Jr.; Howland, M.D.; Strait, S.R.

1980-11-01T23:59:59.000Z

82

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for January 1 to March 31, 1988: Volume 9: Appendix C  

SciTech Connect (OSTI)

The appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the first quarter of calendar year 1988 (January through March). The data in this volume of Appendix C cover the following wells: 199-N-58; 199-N-59; 199-N-60; 199-N-61; 199-N-67. The data are presented in the following order: Well Completion Report/Title III Inspection List, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

83

Biparticle fluidized bed reactor  

DOE Patents [OSTI]

A fluidized bed reactor system utilizes a fluid phase, a retained fluidized primary particulate phase, and a migratory second particulate phase. The primary particulate phase is a particle such as a gel bead containing an immobilized biocatalyst. The secondary particulate phase, continuously introduced and removed in either cocurrent or countercurrent mode, acts in a secondary role such as a sorbent to continuously remove a product or by-product constituent from the fluid phase. Introduction and removal of the sorbent phase is accomplished through the use of feed screw mechanisms and multivane slurry valves. 3 figs.

Scott, C.D.; Marasco, J.A.

1995-04-25T23:59:59.000Z

84

Biparticle fluidized bed reactor  

DOE Patents [OSTI]

A fluidized bed reactor system is described which utilizes a fluid phase, a retained fluidized primary particulate phase, and a migratory second particulate phase. The primary particulate phase is a particle such as a gel bead containing an immobilized biocatalyst. The secondary and tertiary particulate phases, continuously introduced and removed simultaneously in the cocurrent and countercurrent mode, act in a role such as a sorbent to continuously remove a product or by-product constituent from the fluid phase. Means for introducing and removing the sorbent phases include feed screw mechanisms and multivane slurry valves. 3 figs.

Scott, C.D.; Marasco, J.A.

1996-02-27T23:59:59.000Z

85

BURNING GROUND RD CDV-SMA-2.3  

E-Print Network [OSTI]

GROUND BUNKER 430 ANCHORRANCH V-SITE 260 332 RESTHOUSE 410 360 PLASTICS Cañon de Valle S-Site Canyon Fish

86

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period, January 1-March 31, 1988: Volume 6, Appendix B (contd)  

SciTech Connect (OSTI)

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W7-5; 299-W7-6; 299-W8-1; 299-W9-1; 299-W10-13. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

87

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 8, Appendix B (contd)  

SciTech Connect (OSTI)

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W18-21; 299-W18-22; 299-W18-23; 299-W18-24. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

88

Ground-water monitoring compliance projects for Hanford Site facilities: Progress report, January 1-March 31, 1988: Volume 3, Appendix A  

SciTech Connect (OSTI)

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E32-2; 299-E32-3; 299-E32-4; 299-E33-28; 299-E33-29. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

89

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 2, Appendix A  

SciTech Connect (OSTI)

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E27-8; 299-E27-9; 299-E27-10; 299-E28-26; 299-E28-27. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

90

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 7, Appendix B (contd)  

SciTech Connect (OSTI)

This appendix is one of nine volumes, and presents data describing wwlls completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W10-14; 299-W15-15; 299-W15-16; 299-W15-17; 299-W15-18. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

91

Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 4, Appendix A (contd)  

SciTech Connect (OSTI)

This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E33-30; 299-E34-2; 299-E34-3; 299-E34-4; 299-E34-5; 299-E34-6. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

Not Available

1988-05-01T23:59:59.000Z

92

A 25-month database of stratus cloud properties generated from ground-based measurements at the Atmospheric Radiation Measurement Southern Great Plains Site  

SciTech Connect (OSTI)

A 25-month database of the macrophysical, microphysical, and radiative properties of isolated and overcast low-level stratus clouds has been generated using a newly developed parameterization and surface measurements from the Atmospheric Radiation Measurement central facility in Oklahoma. The database (5-min resolution) includes two parts: measurements and retrievals. The former consist of cloud base and top heights, layer-mean temperature, cloud liquid water path, and solar transmission ratio measured by a ground-based lidar/ceilometer and radar pair, radiosondes, a microwave radiometer, and a standard Eppley precision spectral pyranometer, respectively. The retrievals include the cloud-droplet effective radius and number concentration and broadband shortwave optical depth and cloud and top-of-atmosphere albedos. Stratus without any overlying mid or high-level clouds occurred most frequently during winter and least often during summer. Mean cloud-layer altitudes and geometric thicknesses were higher and greater, respectively, in summer than in winter. Both quantities are positively correlated with the cloud-layer mean temperature. Mean cloud-droplet effective radii range from 8.1 {mu}m in winter to 9.7 {mu}m during summer, while cloud-droplet number concentrations during winter are nearly twice those in summer. Since cloud liquid water paths are almost the same in both seasons, cloud optical depth is higher during the winter, leading to greater cloud albedos and lower cloud transmittances. (c) 2000 American Geophysical Union.

Dong, Xiquan [Meteorology Department, University of Utah, Salt Lake City (United States)] [Meteorology Department, University of Utah, Salt Lake City (United States); Minnis, Patrick [NASA Langley Research Center, Hampton, Virginia (United States)] [NASA Langley Research Center, Hampton, Virginia (United States); Ackerman, Thomas P. [Pacific Northwest National Laboratory, DOE, Richland, Washington (United States)] [Pacific Northwest National Laboratory, DOE, Richland, Washington (United States); Clothiaux, Eugene E. [Department of Meteorology, Pennsylvania State University, University Park (United States)] [Department of Meteorology, Pennsylvania State University, University Park (United States); Mace, Gerald G. [Meteorology Department, University of Utah, Salt Lake City (United States)] [Meteorology Department, University of Utah, Salt Lake City (United States); Long, Charles N. [Department of Meteorology, Pennsylvania State University, University Park (United States)] [Department of Meteorology, Pennsylvania State University, University Park (United States); Liljegren, James C. [Ames Laboratory, DOE, Ames, Iowa (United States)] [Ames Laboratory, DOE, Ames, Iowa (United States)

2000-02-27T23:59:59.000Z

93

Determining average bed temperature of nonisothermal fixed-bed hydrotreater  

Science Journals Connector (OSTI)

Employing three catalysts in three parallel pilot-scale fixed-bed reactors, hydrotreating experiments were performed in both isothermal and ascending temperature modes to investigate kinetics and to determine a representative bed temperature. Assuming 1.5th-order for hydrodesulfurization (HDS) and 1st-order for both hydrodenitrogenation (HDN) and mild hydrocracking (MHC), kinetic parameters were obtained from the isothermal mode operation. With the activation energies from isothermal operations, equivalent isothermal temperatures (EITs) in the ascending mode operations were established for specific HDS, HDN and MHC. Employing 19 thermocouple readouts in the catalyst beds and applying an Arrhenius-type rate equation containing the same activation energy, the representative bed temperature was determined. The temperature so determined is called kinetic EIT. The kinetic EIT was found to be the best to represent the nonisothermal bed temperature. The kinetic EIT has been applied to monitoring the catalyst activity in commercial hydrotreating units.

Sok Yui; John Adjaye

2004-01-01T23:59:59.000Z

94

Pulsed atmospheric fluidized bed combustion  

SciTech Connect (OSTI)

The general specifications for a Pulsed Atmospheric Fluidized Bed Combustor Design Report (PAFBC) plant are presented. The design tasks for the PAFBC are described in the following areas: Coal/Limestone preparation and feed system; pulse combustor; fluidized bed; boiler parts; and ash handling system.

Not Available

1992-08-01T23:59:59.000Z

95

A new bed elevation dataset for Greenland  

E-Print Network [OSTI]

A new bed elevation dataset for Greenland J. L. Bamber 1 ,al. : A new bed elevation dataset for Greenland Howat, I. M.al. : A new bed elevation dataset for Greenland Fig. 3. (a)

2013-01-01T23:59:59.000Z

96

Seismic testing of full?scale structures through applied ground motion  

Science Journals Connector (OSTI)

The Nevada Testing Institute (NeTI) and SRI International (SRI) in partnership with prominent research universities and state and federal government and industry have been evolving since 1995 a unique concept of generating earthquake?like ground motion to test large? and full?scale structures and structural systems at the Nevada Test Site. The RESCUE technique is used to produce strong ground motion by simultaneously expanding a planar array of buried vertical sources. The ground motion sources consist of a rubber bladder wrapped around a steel rectangular mandrel. Propellant is burnt in the source to produce low pressures that expand the bladder to move the soil bed. Because pressures are low the soil is not damaged allowing for sequential pulses and multiple tests on test structures. Eighty cycles of ground motion over durations of up to 120 s will be available in full scale. Proof?of?concept testing was successfully completed in 1998 in California and Nevada. The tests show that ground motions with accelerations of 1g to potentially 3g velocities of 100 to 140 cm/s and displacements of 60 cm to greater than 100 cm can be produced at the full scale test center. Construction of the full?scale testing center beginning in 2000 is planned.

Peter A. Mote; Paul R. Gefken

1999-01-01T23:59:59.000Z

97

Hanford Site, Tribes Raise Awareness of Culturally Significant Resources With Training Site  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. – About seven acres in size, the cultural resources test beds site is a small area of the 586-square-mile Hanford site. But its impact is big.

98

Hanford Site, Tribes Raise Awareness of Culturally Significant...  

Office of Environmental Management (EM)

occurring volcanic glass, which is part of a simulated fire hearth at the cultural test beds site. Julie Longenecker, left, and Jill Conrad, center, watch Keith Mendez handle...

99

Twelfth annual fluidized bed conference  

SciTech Connect (OSTI)

The Proceedings of the Twelfth Annual Fluidized Bed Conference held November 11-13, 1996 in Pittsburgh, PA are presented. Information is given on: owner`s discussions; new aspects and field upgrades in fluidized bed boilers; manufacturer`s perspectives; fuel considerations; FBC ash reclassification; and beneficial uses of FBC ash. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

NONE

1996-12-31T23:59:59.000Z

100

Stream-bed scour, egg burial depths, and the influence of salmonid spawning on bed surface  

E-Print Network [OSTI]

Stream-bed scour, egg burial depths, and the influence of salmonid spawning on bed surface mobility-Hames, and Thomas P. Quinn Abstract: Bed scour, egg pocket depths, and alteration of stream-bed surfaces by spawning chum salmon (Onchorhynchus keta) were measured in two Pacific Northwest gravel-bedded streams. Close

Montgomery, David R.

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Site Index - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Index Site Index Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Site Index Email Email Page | Print Print Page |Text Increase Font Size Decrease...

102

Potential health impacts of burning coal beds and waste banks  

Science Journals Connector (OSTI)

Uncontrolled release of pollutants from burning coal beds and waste banks presents potential environmental and human health hazards. On a global scale, the emissions of large volumes of greenhouse gases from burning coal beds may contribute to climate change that alters ecosystems and patterns of disease occurrence. On regional and local scales, the emissions from burning coal beds and waste banks of acidic gases, particulates, organic compounds, and trace elements can contribute to a range of respiratory and other human health problems. Although there are few published reports of health problems caused by these emissions, the potential for problems can be significant. In India, large numbers of people have been displaced from their homes because of health problems caused by emissions from burning coal beds. Volatile elements such as arsenic, fluorine, mercury, and selenium are commonly enriched in coal deposits. Burning coal beds can volatilize these elements, which then can be inhaled, or adsorbed on crops and foods, taken up by livestock or bioaccumulated in birds and fish. Some of these elements can condense on dust particles that can be inhaled or ingested. In addition, selenium, arsenic, lead, tin, bismuth, fluorine, and other elements condense where the hot gaseous emissions come in contact with ambient air, forming mats of concentrated efflorescent minerals on the surface of the ground. These mats can be leached by rainwater and washed into local water bodies providing other potential routes of exposure. Although there are little data linking burning coal beds and waste banks to known health problems, a possibly analogous situation exists in rural China where mineralized coal burned in a residential environment has caused widespread and severe health problems such as fluorosis and arseniasis.

Robert B Finkelman

2004-01-01T23:59:59.000Z

103

Utilization of ash from fluidized bed boilers  

SciTech Connect (OSTI)

Combustion ash from a fluidized bed combustion (FBC) boiler contains not only carbon, but also silica alumina, quicklime as a sorbent, and a calcium sulfate by-product. These substances react chemically during fluidized bed combustion, and with the addition of water, they start an ettringite reaction and solidify. We determined the conditions necessary for producing hard solids through the study of the composition, curing methods, and characteristics of the solidified ash. We then used two types of road base material, crushed stone and solidified ash from an FBC boiler, to construct a test road at a site with a great deal of heavy traffic. Construction began in 1985, and since then, periodic tests have been performed to evaluate the performance of the road base materials. The testing of the manufacturing techniques centered on the amount and manner that water was added to the mixture and the curing methods of the mixture. Additional testing focused on the handling of the ash powder, the mixtures, and the solidified ash. Since 1991, under the sponsorship of MITI, the Center for Coal Utilization, in conjunction with Naruto Salt Mfg., Ltd., Nippon Hodo Co., Ltd., and Kawasaki Heavy Industries, Ltd., has used the referenced results to undertake a joint research and development project aimed at the eventual practical application of the technology. In 1993, a pilot facility to solidify ash with the fluidized bed boiler of 75 t/h capacity was completed. At present, all the discharged ash from the pilot facility is being solidified, and experiments on solidification and road base application techniques are underway. Actual road base tests are also in progress, and we are continuing research to meet the national certification requirements for road base materials.

Takada, Tomoaki [Kawasaki Heavy Industries Co., Ltd., Akashi (Japan)

1994-12-31T23:59:59.000Z

104

Site Map  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home » Site Map Home » Site Map Site Map Home About Overview NERSC Mission Contact us Staff Center Leadership Sudip Dosanjh Select Publications Jeff Broughton Katie Antypas John Shalf Francesca Verdier Center Administration James Craw Norma Early Jeff Grounds Betsy MacGowan Zaida McCunney Lynn Rippe Suzanne Stevenson David Tooker Center Communications Jon Bashor Linda Vu Margie Wylie Kathy Kincade Advanced Technologies Group Nicholas Wright Brian Austin Research Projects Matthew Cordery Christopher Daley Analytics Group Peter Nugent David Camp Hank Childs Harinarayan Krishnan Burlen Loring Joerg Meyer Prabhat Oliver Ruebel Daniela Ushizima Gunther Weber Yushu Yao Computational Systems Group Jay Srinivasan James Botts Scott Burrow Tina Butler Nick Cardo Tina Declerck Ilya Malinov David Paul Larry Pezzaglia Iwona Sakrejda

105

Analysis of Contaminant Rebound in Ground Water in Extraction...  

Office of Environmental Management (EM)

Analysis of Contaminant Rebound in Ground Water in Extraction Wells at the Tuba City, Arizona, Site Analysis of Contaminant Rebound in Ground Water in Extraction Wells at the Tuba...

106

Diffusion Multilayer Sampling of Ground Water in Five Wells at...  

Office of Environmental Management (EM)

Diffusion Multilayer Sampling of Ground Water in Five Wells at the Tuba City, Arizona, Site Diffusion Multilayer Sampling of Ground Water in Five Wells at the Tuba City, Arizona,...

107

Advanced atmospheric fluidized-bed combustion design - spouted bed  

SciTech Connect (OSTI)

This report describes the Spouted-Fluidized Bed Boiler that is an advanced atmospheric fluidized bed combustor (FBC). The objective of this system design study is to develop an advanced AFBC with improved performance and reduced capital and operating costs compared to a conventional AFBC and an oil-fired system. The Spouted-Fluidized Bed (SFB) system is a special type of FBC with a distinctive jet of air in the bed to establish an identifiable solids circulation pattern. This feature is expected to provide: reduced NO/sub x/ emissions because of the fuel rich spout zone; high calcium utilization, calcium-to-sulfur ratio of 1.5, because of the spout attrition and mixing; high fuel utilization because of the solids circulation and spout attrition; improved thermal efficiency because of reduced solids heat loss; and improved fuel flexibility because of the spout phenomena. The SFB was compared to a conventional AFBC and an oil-fired package boiler for 15,000 pound per hour system. The evaluation showed that the operating cost advantages of the SFB resulted from savings in fuel, limestone, and waste disposal. The relative levelized cost for steam from the three systems in constant 1985 dollars is: SFB - $10 per thousand pounds; AFBC - $11 per thousand pounds; oil-fired - $14 per thousand pounds. 18 refs., 5 figs., 11 tabs.

Shirley, F.W.; Litt, R.D.

1985-11-27T23:59:59.000Z

108

Appendix B Ground Water Management Policy  

Office of Legacy Management (LM)

Ground Water Management Policy Ground Water Management Policy for the Monticello Mill Tailings Site and Adjacent Areas This page intentionally left blank Docun~ent Number Q0029500 Appendix B State of Utah DEPARTblENT OF NATURAL RESOURCES DIVISION OF WATER RIGHTS Ground-Water Management Policy for the Mot~ticello Mill Tailings Site and Adjacent Areas The Monticello Mill Tailings Site is on the southeast portion of the tovm of Monticello in Sectton 36, T33S, K23E and Section 31, i33S. R24E, SLB&M. The mill site was used from 1942 to 1960 in the processing of uranium and vanadium. The U.S. Department of Energy (DOE) is currently cleaning up the site. The site is in the small canyon that forms the drainage for South Creek. The general direction of water flow, of both surface streams and the shallow

109

Bed management in a Critical Care Unit  

Science Journals Connector (OSTI)

......can also be approach using a stochastic...150 BED MANAGEMENT IN A CRITICAL...of Decision Sciences and Information Management, Catholic University...bed-occupancy management and planning...Improving the Sipp approach for staffing......

J. D. Griffiths; V. Knight; I. Komenda

2013-04-01T23:59:59.000Z

110

Eleventh annual fluidized bed conference  

SciTech Connect (OSTI)

The Proceedings of the Eleventh Annual Fluidized Bed Conference are presented. The Conference was held November 14-15, 1995 in Allentown, Pennsylvania and discussed the following topics: third and fourth generation systems; fuel considerations; and FBC energy and environmntal regulatory issues. A separate abstract was entered into the Energy Science and Technology Database for each of the 19 papers presented at the conference.

NONE

1995-12-31T23:59:59.000Z

111

Fluidization quality analyzer for fluidized beds  

DOE Patents [OSTI]

A control loop and fluidization quality analyzer for a fluidized bed utilizes time varying pressure drop measurements. A fast-response pressure transducer measures the overall bed pressure drop, or over some segment of the bed, and the pressure drop signal is processed to produce an output voltage which changes with the degree of fluidization turbulence. 9 figs.

Daw, C.S.; Hawk, J.A.

1995-07-25T23:59:59.000Z

112

Uniform retorting of an anisotropic shale bed  

SciTech Connect (OSTI)

In situ oil shale retorts have typically been designed for the fracturing event to produce a rubble bed having uniform cross-sectional rubble properties. This uniform rubble bed approach strived to produce constant void fraction and particle size distribution within all regions of the rubble bed. Ideally, these isotropic rubble beds have uniform flow of oxidants, retorting and combustion products. However, edge effects during the blast event typically produce channeling at the retort walls during processing, reducing the rubble sweep and the local yield. Second generation in situ retorts are addressing uniform retorting within the rubble bed rather than the uniformity of rubble bed properties. Here, the blast design produces and anisotropic rubble bed with varying particle size distribution and void fraction normal to the direction of flow. This paper describes a laboratory experiment in which a highly-instrumented, 100 kg bed of shale with zones of differing particle size and void was retorted. Shale particle size and void were varied over the retort cross-section so that a retorting front would move at a constant velocity downward through the rubble bed. The bed was designed using data from numerous pressure drop measurements on uniform shale beds of varying shale particle size distribution and void. Retorting of the bed showed a uniform retorting front and a yield comparable with that achieved in isotropic shale beds. We present thermal data and offgas, oil and shale analyses (allowing material and energy balance closures) and compare these data to previous vertical retorting experiments on uniform and non-uniform beds of shale. This experiment verifies that uniform retorting fronts can be achieved in correctly designed anisotropic beds of shale and validates the concept of uniform retorting in order increase the oil recovery in second generation retorts. 20 refs., 17 figs., 4 tabs.

Bickel, T.C.; Cook, D.W.; Engler, B.P.

1986-01-01T23:59:59.000Z

113

Ground Water Management District Rules | Open Energy Information  

Open Energy Info (EERE)

District Rules Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Ground Water Management District Rules Abstract This webpage provides information...

114

CERTS Microgrid Laboratory Test Bed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CERTS Microgrid Laboratory Test Bed CERTS Microgrid Laboratory Test Bed Title CERTS Microgrid Laboratory Test Bed Publication Type Journal Article LBNL Report Number LBNL-3553E Year of Publication 2011 Authors Lasseter, Robert H., Joseph H. Eto, Ben Schenkman, John Stevens, Harry T. Volkommer, David Klapp, Ed Linton, Hector Hurtado, and Joyashree Roy Journal IEEE Transactions on Power Delivery Volume 26 Start Page 325 Issue 1 Date Published 01/2011 Keywords distributed energy resources (der) Abstract CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a "microgrid". The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resynchronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. Keywords: CHP, UPS, distributed generation, intentional islanding, inverters, microgrid, CERTS, power vs. frequency droop, voltage droop.

115

On-Site Wastewater Treatment Systems: Evapotranspiration Bed (Spanish)  

E-Print Network [OSTI]

mecha es una columna de suelo que se extiende del medio rocoso hasta el fondo de la cama. El ?rea total de mecha debe ser entre el 10 y el 15 por ciento de la superficie de la cama y debe estar uniforme- mente acomodada por toda la cama. Despu?s de poner... Especialistas en Ingenier?a Agr?cola El Sistema Universitario Texas A&M L-5228S 4-02 Figure 1: Un sistema de lecho de evapotranspiraci?n. U na cama de evapotranspiraci?n (ET) trata las aguas negras usando la evapotranspiraci?n, la p?rdida de agua del suelo por...

Lesikar, Bruce J.; Enciso, Juan

2002-04-18T23:59:59.000Z

116

DOE - Office of Legacy Management -- Falls City Mill Site - TX...  

Office of Legacy Management (LM)

Control Act Title I Disposal Sites-Falls City, Texas, Disposal Site. LMSS10631. March 2014 Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings...

117

Ground water and energy  

SciTech Connect (OSTI)

This national workshop on ground water and energy was conceived by the US Department of Energy's Office of Environmental Assessments. Generally, OEA needed to know what data are available on ground water, what information is still needed, and how DOE can best utilize what has already been learned. The workshop focussed on three areas: (1) ground water supply; (2) conflicts and barriers to ground water use; and (3) alternatives or solutions to the various issues relating to ground water. (ACR)

Not Available

1980-11-01T23:59:59.000Z

118

Gas distributor for fluidized bed coal gasifier  

DOE Patents [OSTI]

A gas distributor for distributing high temperature reaction gases to a fluidized bed of coal particles in a coal gasification process. The distributor includes a pipe with a refractory reinforced lining and a plurality of openings in the lining through which gas is fed into the bed. These feed openings have an expanding tapered shape in the downstream or exhaust direction which aids in reducing the velocity of the gas jets as they enter the bed.

Worley, Arthur C. (Mt. Tabor, NJ); Zboray, James A. (Irvine, CA)

1980-01-01T23:59:59.000Z

119

Battery using a metal particle bed electrode  

DOE Patents [OSTI]

A zinc-air battery in a case including a zinc particle bed supported adjacent the current feeder and diaphragm on a porous support plate which holds the particles but passes electrolyte solution. Electrolyte is recycled through a conduit between the support plate and top of the bed by convective forces created by a density of differential caused by a higher concentration of high density discharge products in the interstices of the bed than in the electrolyte recycle conduit.

Evans, James V. (Piedmont, CA); Savaskan, Gultekin (Albany, CA)

1991-01-01T23:59:59.000Z

120

Building a Raised Bed Garden  

E-Print Network [OSTI]

need, and are less likely to wet foliage. However, they do have some disadvantages. Emitters are prone to clogging unless the water used is very clean, and if emitters are installed under mulch it is difficult to spot problems. Emitters are also... this flexibility as your plantings mature. If you choose drip or trickle irrigation, determine the length of the hose and the number of emitters you will need. Drip tape with 12-inch emitter spacing is best for vegetables. Beds should be divided into watering zones...

Files, Priscilla J.; Dainello, Frank J.; Arnold, Michael A.; Welsh, Douglas F.

2009-03-26T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Circulating fluidised-bed combustion  

SciTech Connect (OSTI)

Steam generators with circulating fluidized-bed combustion systems (CFBC) are characterized by a high degree of environmental comparability and a wide acceptance for FBC boiler plants involving a wide fuel spectrum which ranges from dried brown coal to high-ash coal and low-volatile bituminous coal as well as wood waste and bark. These plants incorporate a variety of CFBC systems. The choice in favor of different system options was not motivated by the inherent fuel properties but has evolved from the progressive advancement in power station FBC technology. The article elucidates several FBC system variants.

Rettemeier, W.; von der Kammer, G. (Steinmueller (L.u.C.) GmbH, Gummersbach (Germany, F.R.))

1990-01-01T23:59:59.000Z

122

Fluidized Bed Technology - Overview | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fluidized-bed combustion evolved from efforts to find a combustion process able to control pollutant emissions without external emission controls (such as scrubbers). The...

123

Combined fluidized bed retort and combustor  

DOE Patents [OSTI]

The present invention is directed to a combined fluidized bed retorting and combustion system particularly useful for extracting energy values from oil shale. The oil-shale retort and combustor are disposed side-by-side and in registry with one another through passageways in a partition therebetween. The passageways in the partition are submerged below the top of the respective fluid beds to preclude admixing or the product gases from the two chambers. The solid oil shale or bed material is transported through the chambers by inclining or slanting the fluidizing medium distributor so that the solid bed material, when fluidized, moves in the direction of the downward slope of the distributor.

Shang, Jer-Yu (Fairfax, VA); Notestein, John E. (Morgantown, WV); Mei, Joseph S. (Morgantown, WV); Zeng, Li-Wen (Morgantown, WV)

1984-01-01T23:59:59.000Z

124

Particle Receiver Integrated with Fludized Bed  

Broader source: Energy.gov (indexed) [DOE]

Bed CONTACTS Partnering Organizations: * Babcock & Wilcox Power Generation Group, Inc. * Massachusetts Institute of Technology For more information, visit the project page at:...

125

Granular Dynamics in Pebble Bed Reactor Cores  

E-Print Network [OSTI]

pebble bed reactor,” Nuclear Engineering and Design, vol.the AVR reactor,” Nuclear Engineering and Design, vol. 121,Operating Experience,” Nuclear Engineering and Design, vol.

Laufer, Michael Robert

2013-01-01T23:59:59.000Z

126

Calculating bed load transport in steep boulder bed channels E. M. Yager,1,2  

E-Print Network [OSTI]

Calculating bed load transport in steep boulder bed channels E. M. Yager,1,2 J. W. Kirchner,1 and W: Yager, E. M., J. W. Kirchner, and W. E. Dietrich (2007), Calculating bed load transport in steep boulder, more mobile sediment and large, relatively immobile boulders that are often arranged into cascades

Kirchner, James W.

127

Appendix E Supporting Information for Ground Water Modeling  

Office of Legacy Management (LM)

Supporting Information for Ground Water Modeling Supporting Information for Ground Water Modeling This page intentionally left blank Contents Section Geologic Map of Site Area ........................................................................................................ E1.O Stream Flow Measurements ...................................................................................................... E2.0 Estimates of Ground Water Flow .............................................................................................. E3.0 .......................................... MODFLOW Flow Budget Analysis for OU 1 1 1 Model Subregions E4.0 ............................................................................ Burro Canyon Aquifer Ground Water Model E5.0 This page intentionally left blank

128

Chemical and Isotopic Composition and Gas Concentrations of Ground Water and Surface Water from Selected Sites At and Near the Idaho National Engineering and Environmental Laboratory, Idaho, 1994-97  

SciTech Connect (OSTI)

>From May 1994 through May 1997, the US Geological Survey, in cooperation with the US Department of Energy, collected water samples from 86 wells completed in the Snake River Plain aquifer at and near the Idaho National Engineering and Environmental Laboratory. The samples were analyzed for a variety of chemical constituents including all major elements and 22 trace elements. Concentrations of scandium, yttrium, and the lanthanide series were measured in samples from 11 wells and 1 hot spring. The data will be used to determine the fraction of young water in the ground water. The fraction of young water must be known to calculate the ages of ground water using chlorofluorocarbons. The concentrations of the isotopes deuterium, oxygen-18, carbon-13, carbon-14, and tritium were measured in many ground water, surface-water and spring samples. The isotopic composition will provide clues to the origin and sources of water in the Snake River Plain aquifer. Concentrations ! of helium-3 , helium-4, total helium, and neon were measured in most groundwater samples, and the results will be used to determine the recharge temperature, and to date the ground waters.

E. Busenberg; L. N. Plummer; M. W. Doughten; P. K. Widman; R. C. Bartholomay (USGS)

2000-05-30T23:59:59.000Z

129

Ground-water sample collection and analysis plan for the ground-water surveillance project  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy`s (DOE`s) Hanford Site in support of DOE`s environmental surveillance responsibilities. The purpose of this document is to translate DOE`s General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives.

Bryce, R.W.; Evans, J.C.; Olsen, K.B.

1991-12-01T23:59:59.000Z

130

Ground-water sample collection and analysis plan for the ground-water surveillance project  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory performs ground-water sampling activities at the US Department of Energy's (DOE's) Hanford Site in support of DOE's environmental surveillance responsibilities. The purpose of this document is to translate DOE's General Environmental Protection Program (DOE Order 5400.1) into a comprehensive ground-water sample collection and analysis plan for the Hanford Site. This sample collection and analysis plan sets forth the environmental surveillance objectives applicable to ground water, identifies the strategy for selecting sample collection locations, and lists the analyses to be performed to meet those objectives.

Bryce, R.W.; Evans, J.C.; Olsen, K.B.

1991-12-01T23:59:59.000Z

131

Ground Vibration Measurement  

Science Journals Connector (OSTI)

Measurement of ground vibration is important for checking of amplitudes of ... confirmation of efficiency of control measures of ground vibration. The properties of measuring instruments used can affect the resul...

Dr. Milutin Srbulov

2010-01-01T23:59:59.000Z

132

Bed management in a Critical Care Unit  

Science Journals Connector (OSTI)

......with the variability in demand for the services that...adequate facilities on demand can lead to serious consequences...how improvements in bed management may be achieved by distinguishing...task of ensuring that demand for hospital services...equipment at each bed-side is around 60,000......

J. D. Griffiths; V. Knight; I. Komenda

2013-04-01T23:59:59.000Z

133

Tanning bed use, deviance regulation theory, and source factors  

E-Print Network [OSTI]

Tanning bed use, especially among young, white females, has become a serious health problem in the United States. Those who use tanning beds value a tanned appearance; thus, one possible way to get individuals to stop using tanning beds...

Head, Katharine J.

2009-05-15T23:59:59.000Z

134

Characterization of Biofilm in 200W Fluidized Bed Reactors  

SciTech Connect (OSTI)

Contaminated groundwater beneath the 200 West Area at the Hanford Site in Southeast Washington is currently being treated using a pump and treat system to remove organics, inorganics, radionuclides, and metals. A granular activated carbon-based fluidized bed reactor (FBR) has been added to remove nitrate, hexavalent chromium and carbon tetrachloride. Initial analytical results indicated the microorganisms effectively reduced many of the contaminants to less than cleanup levels. However shortly thereafter operational upsets of the FBR include carbon carry over, over production of microbial extracellular polymeric substance (biofilm) materials, and over production of hydrogen sulfide. As a result detailed investigations were undertaken to understand the functional diversity and activity of the microbial community present in the FBR over time. Molecular analyses including terminal restriction fragment length polymorphism analysis, quantitative polymerase chain reaction and fluorescent in situ hybridization analyses were performed on the microbial community extracted from the biofilm within the bed and from the inoculum, to determine functional dynamics of the FBR bed over time and following operational changes. Findings from these analyses indicated: 1) the microbial community within the bed was completely different than community used for inoculation, and was likely from the groundwater; 2) analyses early in the testing showed an FBR community dominated by a few Curvibacter and Flavobacterium species; 3) the final sample taken indicated that the microbial community in the FBR bed had become more diverse; and 4) qPCR analyses indicated that bacteria involved in nitrogen cycling, including denitrifiers and anaerobic ammonia oxidizing bacteria, were dominant in the bed. These results indicate that molecular tools can be powerful for determining functional diversity within FBR type reactors. Coupled with micronutrient, influent and effluent chemistry evaluations, a more complete understanding of the balance between system additions (nutrients, groundwater) and biology can be achieved, thus increasing long-term predictions of performance. These analyses uniquely provide information that can be used in optimizing the overall performance, efficiency, and stability of the system both in real time as well as over the long-term, as the system design is altered or improved and/or new streams are added.

Lee, Michelle H.; Saurey, Sabrina D.; Lee, Brady D.; Parker, Kent E.; Eisenhauer, Emalee ER; Cordova, Elsa A.; Golovich, Elizabeth C.

2014-09-29T23:59:59.000Z

135

Ordered bed modular reactor design proposal  

SciTech Connect (OSTI)

The Ordered Bed Modular Reactor (OBMR) is a design as an advanced modular HTGR in which the annular reactor core is filled with an ordered bed of fuel spheres. This arrangement allows fuel elements to be poured into the core cavity which is shaped so that an ordered bed is formed and to be discharged from the core through the opening holes in the reactor top. These operations can be performed in a shutdown shorter time. The OBMR has the most of advantages from both the pebble bed reactor and block type reactor. Its core has great structural flexibility and stability, which allow increasing reactor output power and outlet gas temperature as well as decreasing core pressure drop. This paper introduces ordered packing bed characteristics, unloading and loading technique of the fuel spheres and predicted design features of the OBMR. (authors)

Tian, J. [Inst. of Nuclear Energy Technology, Tsinghua Univ., Beijing 100084 (China)

2006-07-01T23:59:59.000Z

136

The SEI facility for fluid-bed wood gasification  

SciTech Connect (OSTI)

In mid 1985, construction was begun on the world's largest fluidized bed, wood gasification plant at the clay processing plant in Quincy, Fla. In March 1986, the plant was purchased by Southern Electric International (SEI). This paper describes how SEI coordinated the redesign of many of the plant systems and supervised the completion of construction and startup. In late 1986, the gasifier plant was sold. SEI remains involved as the operations and maintenance contractor on-site and is now responsible for design changes and equipment maintenance.

Bullpitt, W.S.; Rittenhouse, O.C. (Southern Electric International, Inc. North Atlanta, GA (US)); Masterson, L.D. (Southern Electric International Quincy, FL (US))

1989-09-01T23:59:59.000Z

137

Analysis of stream bed sediments of Four Mile Creek  

SciTech Connect (OSTI)

Until 1988, solutions containing nitric acid, odium hydroxide, low levels of radionuclides (mostly tritiated water) and some metals were discharged to unlined seepage basins at the F and H Areas of the Savannah River Site (SRS) as part of normal operations. The basins are now being closed according to the Resource Conservation and Recovery Act (RCA). As part of the closure, a Part B Post-Closure Care Permit is being prepared. The Part B permit requires information on contaminant concentrations in stream bed sediments in the adjacent Four Mile Creek, which are reported herein. 5 refs., 1 fig., 2 tabs.

Haselow, J.S.

1990-08-13T23:59:59.000Z

138

CERTS Microgrid Laboratory Test Bed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitted to IEEE Transactions on Power Delivery Submitted to IEEE Transactions on Power Delivery Abstract--. CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a "microgrid". The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations,

139

Fluidized bed heat treating system  

DOE Patents [OSTI]

Systems for heat treating materials are presented. The systems typically involve a fluidized bed that contains granulated heat treating material. In some embodiments a fluid, such as an inert gas, is flowed through the granulated heat treating medium, which homogenizes the temperature of the heat treating medium. In some embodiments the fluid may be heated in a heating vessel and flowed into the process chamber where the fluid is then flowed through the granulated heat treating medium. In some embodiments the heat treating material may be liquid or granulated heat treating material and the heat treating material may be circulated through a heating vessel into a process chamber where the heat treating material contacts the material to be heat treated. Microwave energy may be used to provide the source of heat for heat treating systems.

Ripley, Edward B; Pfennigwerth, Glenn L

2014-05-06T23:59:59.000Z

140

Evaluating preproduction prototypes of new energy-efficiency products in realistic test beds is an essential step before market  

E-Print Network [OSTI]

enables more cost-effective determination of energy-saving opportunities and ongoing verification. · The greatest barrier preventing wider use of geothermal (ground-source) heat pumps is high initial cost. Two 3Evaluating preproduction prototypes of new energy-efficiency products in realistic test beds

Oak Ridge National Laboratory

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

National SCADA Test Bed - Enhancing control systems security...  

Broader source: Energy.gov (indexed) [DOE]

SCADA Test Bed - Enhancing control systems security in the energy sector (September 2009) National SCADA Test Bed - Enhancing control systems security in the energy sector...

142

Tube construction for fluidized bed combustor  

DOE Patents [OSTI]

A fluidized bed combustor comprises a reactor or a housing which has a windbox distributor plate adjacent the lower end thereof which contains a multiplicity of hole and air discharge nozzles for discharging air and coal into a fluidized bed which is maintained above the distributor plate and below a take-off connection or flue to a cyclone separator in which some of the products of combustion are treated to remove the dust which is returned into the fluidized bed. A windbox is spaced below the fluidized bed and it has a plurality of tubes passing therethrough with the passage of combustion air and fluidizing air which passes through an air space so that fluidizing air is discharged into the reaction chamber fluidized bed at the bottom thereof to maintain the bed in a fluidized condition. A fluid, such as air, is passed through the tubes which extend through the windbox and provide a preheating of the combustion air and into an annular space between telescoped inner and outer tubes which comprise heat exchanger tubes or cooling tubes which extend upwardly through the distributor plate into the fluidized bed. The heat exchanger tubes are advantageously arranged so that they may be exposed in groups within the reactor in a cluster which is arranged within holding rings.

De Feo, Angelo (Totowa, NJ); Hosek, William (Mt. Tabor, NJ)

1984-01-01T23:59:59.000Z

143

Fluid-bed combustion of solid wastes  

SciTech Connect (OSTI)

For over ten years combustion Power Company has been conducting experimental programs and developing fluid bed systems for agencies of the federal government and for private industry and institutions. Many of these activities have involved systems for the combustion of solid waste materials. Discussed here will be three categories of programs, development of Municipal Solid Waste (MSW) fired fluid beds, development of wood waste fired fluid beds, and industrial installations. Research and development work on wood wastes has led to the design and construction of two large industrial fluid bed combustors. In one of these, a fluid bed is used for the generation of steam with a fuel that was previously suited only for landfill. Rocks and inerts are continuously removed from this combustor using a patented system. The second FBC is designed to use a variety of fuels as the source of energy to dry hog fuel for use in a high performance power boiler. Here the FBC burns green hog fuel, log yard debris, fly ash (char) from the boiler, and dried wood fines to produce a hot gas system for the wood dryer. A significant advantage of the fluidized bed reactor over conventional incinerators is its ability to reduce noxious gas emission and, finally, the fluidized bed is unique in its ability to efficiently consume low quality fuels. The relatively high inerts and moisture content of solid wastes pose no serious problem and require no associated additional devices for their removal.

Vander Molen, R.H.

1980-01-01T23:59:59.000Z

144

Fluidized bed combustor and tube construction therefor  

DOE Patents [OSTI]

A fluidized bed combustor comprises a reactor or a housing which has a windbox distributor plate adjacent the lower end thereof which contains a multiplicity of hole and air discharge nozzles for discharging air and coal into a fluidized bed which is maintained above the distributor plate and below a take-off connection or flue to a cyclone separator in which some of the products of combustion are treated to remove the dust which is returned into the fluidized bed. A windbox is spaced below the fluidized bed and it has a plurality of tubes passing therethrough with the passage of combustion air and fluidizing air which passes through an air space so that fluidizing air is discharged into the reaction chamber fluidized bed at the bottom thereof to maintain the bed in a fluidized condition. A fluid, such as air, is passed through the tubes which extend through the windbox and provide a preheating of the combustion air and into an annular space between telescoped inner and outer tubes which comprise heat exchanger tubes or cooling tubes which extend upwardly through the distributor plate into the fluidized bed. The heat exchanger tubes are advantageously arranged so that they may be exposed in groups within the reactor in a cluster which is arranged within holding rings.

De Feo, Angelo (Passaic, NJ); Hosek, William (Morris, NJ)

1981-01-01T23:59:59.000Z

145

MONTICELLO NPL SITES  

Office of Legacy Management (LM)

.. ' \ MONTICELLO NPL SITES FFA QUARTERLY REPORT: October 1 -December 31, 2008 DOE Site Manager: Jalena Dayvault JR 7CJ7 This report summarizes current project status and activities implemented during October tiU'ough December 2008, and provides a schedule of planned near term activities for the Monticello MIII Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This report also includes repository and Pond 4 leachate collection data, quarterly site inspection repmis, site meteorological data, and monitoring summary for tlw ex situ ground water treatment system. 1.0 MMTS Activities/Status Repository and Pond 4 · * Monthly and quarterly inspection of the repository identified no abnormalities (see attached repmis). .

146

ColumbusSites.cdr  

Office of Legacy Management (LM)

Columbus, Ohio, Sites consist of two geographically Columbus, Ohio, Sites consist of two geographically separate properties owned by the Battelle Memorial Institute: the King Avenue site, located in the city of Columbus, and the West Jefferson site, located approx- imately 15 miles west of Columbus. Battelle conducted extensive nuclear research at both locations for the U.S. Department of Energy (DOE) and its predecessor agencies between 1943 and 1986. The research resulted in contamination of soil, buildings, and equipment with radioactive and mixed waste materials. Environmental cleanup of the sites began in 1986. The 6-acre King Avenue site, which was historically a part of the federal government's fuel and target fab- rication program, consisted of 9 buildings and the surrounding grounds. Nuclear research conducted at the

147

Cleanup Verification Package for the 118-F-1 Burial Ground  

SciTech Connect (OSTI)

This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

E. J. Farris and H. M. Sulloway

2008-01-10T23:59:59.000Z

148

Site survey method and apparatus  

DOE Patents [OSTI]

The disclosure of the invention is directed to a site survey ground vehicle based apparatus and method for automatically detecting source materials, such as radioactivity, marking the location of the source materials, such as with paint, and mapping the location of the source materials on a site. The apparatus of the invention is also useful for collecting and analyzing samples. The apparatus includes a ground vehicle, detectors mounted at the front of the ground vehicle, and individual detector supports which follow somewhat irregular terrain to allow consistent and accurate detection, and autolocation equipment. 19 figures.

Oldham, J.G.; Spencer, C.R.; Begley, C.L.; Meyer, H.R.

1991-06-18T23:59:59.000Z

149

Fluidized bed catalytic coal gasification process  

DOE Patents [OSTI]

Coal or similar carbonaceous solids impregnated with gasification catalyst constituents (16) are oxidized by contact with a gas containing between 2 volume percent and 21 volume percent oxygen at a temperature between 50.degree. C. and 250.degree. C. in an oxidation zone (24) and the resultant oxidized, catalyst impregnated solids are then gasified in a fluidized bed gasification zone (44) at an elevated pressure. The oxidation of the catalyst impregnated solids under these conditions insures that the bed density in the fluidized bed gasification zone will be relatively high even though the solids are gasified at elevated pressure and temperature.

Euker, Jr., Charles A. (15163 Dianna La., Houston, TX 77062); Wesselhoft, Robert D. (120 Caldwell, Baytown, TX 77520); Dunkleman, John J. (3704 Autumn La., Baytown, TX 77520); Aquino, Dolores C. (15142 McConn, Webster, TX 77598); Gouker, Toby R. (5413 Rocksprings Dr., LaPorte, TX 77571)

1984-01-01T23:59:59.000Z

150

ARM - Site Instruments  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Darwin SiteInstruments Darwin SiteInstruments TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts Instruments : Central Facility, Darwin, Australia [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] CSPHOT Cimel Sunphotometer Aerosols, Radiometric Browse Data [ Single installation ] DISDROMETER Impact Disdrometer Surface Meteorology Browse Plots Browse Data [ Single installation ] DL Doppler Lidar Cloud Properties Browse Data [ Single installation ] GNDRAD Ground Radiometers on Stand for Upwelling Radiation Radiometric Browse Plots

151

Brookhaven National Laboratory site environmental report for calendar year 1993  

SciTech Connect (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A. [eds.

1994-05-01T23:59:59.000Z

152

Ground Water Management Act (Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ground Water Management Act (Virginia) Ground Water Management Act (Virginia) Ground Water Management Act (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Virginia Program Type Environmental Regulations Siting and Permitting Provider Virginia Department of Environmental Quality Under the Ground Water Management Act of 1992, Virginia manages ground water through a program regulating the withdrawals in certain areas called

153

Chapter 14 - Coal bed methane  

Science Journals Connector (OSTI)

Publisher Summary Methane adsorbed to the surface of coal is a very old issue with some new commercial ramifications. This explosive gas has made underground coal mines dangerous both from the risk of explosion and the possibility of an oxygen-poor atmosphere that wouldn't support life. The miner's main concern with coal bed methane (CBM) has been how to get rid of it. Techniques to deal with CBM in mines have ranged from the classic canary in a cage to detect an oxygen-poor atmosphere to huge ventilation fans to force the replacement of a methane-rich environment with outside air, to drilling CBM wells in front of the coal face to try to degas the coal prior to exposing the mine to the CBM. All these techniques have met with some amount of success. None of the techniques to prevent CBM from fouling the air in an underground mine has been totally successful. With the CBM's unique method of gas storage, the preponderance of the gas is available only to very low coalface pressures. The coalface pressure is set by a combination of flowing wellhead pressure and the hydrostatic head exerted by standing liquid within the well bore. Effective compression strategies can lower the wellhead pressure to very low values. Effective deliquification techniques can reduce or remove the backpressure caused by accumulated liquid. CBM's economic impact is briefly explained in this chapter.

James F. Lea; Henry V. Nickens; Mike R. Wells

2008-01-01T23:59:59.000Z

154

Fluidized bed combustor 50 MW thermal power plant, Krabi, Thailand. Feasibility study. Export trade information  

SciTech Connect (OSTI)

The report presents the results of a study prepared by Burns and Roe for the Electricity Generating Authority of Thailand to examine the technical feasibility and economic attractiveness for building a 50 MW Atmospheric Fluidized Bed Combustion lignite fired power plant at Krabi, southern Thailand. The study is divided into seven main sections, plus an executive summary and appendices: (1) Introduction; (2) Atmospheric Fluidized Bed Combustion Technology Overview; (3) Fuel and Limestone Tests; (4) Site Evaluation; (5) Station Design and Arrangements; (6) Environmental Considerations; (7) Economic Analysis.

Not Available

1993-01-01T23:59:59.000Z

155

Fluidized Bed Technology - Overview | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Science & Innovation » Clean Coal » Advanced Combustion Science & Innovation » Clean Coal » Advanced Combustion Technologies » Fluidized Bed Technology - Overview Fluidized Bed Technology - Overview Fluidized beds suspend solid fuels on upward-blowing jets of air during the combustion process. The result is a turbulent mixing of gas and solids. The tumbling action, much like a bubbling fluid, provides more effective chemical reactions and heat transfer. Fluidized-bed combustion evolved from efforts to find a combustion process able to control pollutant emissions without external emission controls (such as scrubbers). The technology burns fuel at temperatures of 1,400 to 1,700 degrees F, well below the threshold where nitrogen oxides form (at approximately 2,500 degrees F, the nitrogen and oxygen atoms in the

156

Biomass Gasification in Dual Fluidized Bed Gasifier  

Science Journals Connector (OSTI)

The dual fluidized bed gasification technology is prospective because it produces high...2...dilution even when air is used to generate the required endothermic heat via in situ combustion. This study is devoted ...

Toshiyuki Suda; Takahiro Murakami…

2007-01-01T23:59:59.000Z

157

MOSE: operational forecast of the optical turbulence and atmospheric parameters at European Southern Observatory ground-based sites – II. Atmospheric parameters in the surface layer 0–30 m  

Science Journals Connector (OSTI)

......filtering of the weak winds) and is always inferior...to the threshold of the wind speed. The improvements...orography of both sites (local peaks surrounded by mountainous...difficulties in forecasting the wind direction in such conditions...another mesocale model, wrf. Indeed, using a nesting......

F. Lascaux; E. Masciadri; L. Fini

2013-01-01T23:59:59.000Z

158

Substation grounding optimization.  

E-Print Network [OSTI]

??Substation grounding is a critical part of the overall electric power system. It is designed to not only provide a path to dissipate electric currents… (more)

Balev, Vadim

2014-01-01T23:59:59.000Z

159

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 3, is a users manual and an installation and validation manual for the computer program SGSYS (Substation Grounding SYStem Analysis Program). This program analyzes the substation ground field given the total electric current injected into the ground field and the design of the grounding system. Standard outputs of the program are (1) total ground resistance, (2) step voltage, (3) touch voltage, (4) voltages on a grid of points, (5) voltage profile along straight lines, (6) transfer voltages, (7) ground potential rise, (8) body currents, (9) step voltage profile along straight lines, and (10) touch voltage profile along straight lines. This program can be utilized in an interactive or batch mode. In the interactive mode, the user defines the grounding system geometry, soil parameters, and output requests interactively, with the use of a user friendly conversational program. The users manual describes data requirements and data preparation procedures. An appendix provides forms which facilitate data collection procedures. The installation and validation manual describes the computer files which make up the program SGSYS and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

160

Distribution of bed material in a Horizontal Circulating Fluidised Bed boiler.  

E-Print Network [OSTI]

??A conventional circulating fluidised bed (CFB) boiler has a limitation due to the height of the furnace, when implemented in smaller industrial facilities. The design… (more)

Ekvall, Thomas

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Fluidized bed injection assembly for coal gasification  

DOE Patents [OSTI]

A coaxial feed system for fluidized bed coal gasification processes including an inner tube for injecting particulate combustibles into a transport gas, an inner annulus about the inner tube for injecting an oxidizing gas, and an outer annulus about the inner annulus for transporting a fluidizing and cooling gas. The combustibles and oxidizing gas are discharged vertically upward directly into the combustion jet, and the fluidizing and cooling gas is discharged in a downward radial direction into the bed below the combustion jet.

Cherish, Peter (Bethel Park, PA); Salvador, Louis A. (Hempfield Township, Westmoreland County, PA)

1981-01-01T23:59:59.000Z

162

Fluid Bed Combustion Applied to Industrial Waste  

E-Print Network [OSTI]

of its relatively recent application to coal fired steam production, fluid beds have been uti lized in industry for over 60 years. Beginning in Germany in the twenties for coal gasification, the technology was applied to catalytic cracking of heavy... system cost), use of minimum excess air required, and maintaining the min"imum reactor temperature neces sary to sustain combustion. For superautogenous fuels, where incineration. only is desired, minimum capital cost is achieved by using direct bed...

Mullen, J. F.; Sneyd, R. J.

163

Hanford Site Tours - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Tours Hanford Site Tours Hanford Tour Restrictions Hanford Site Tours Hanford Tours for Governmental Officials Hanford Tours for Tribal Affairs Hanford Private Tours Media...

164

Site observational work plan for the UMTRA Project site at Falls City, Texas  

SciTech Connect (OSTI)

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

165

site_transition.cdr  

Broader source: Energy.gov (indexed) [DOE]

Legacy Legacy Management U.S. DEPARTMENT OF This fact sheet explains the process for transferring a site to the U.S. Department of Energy Office of Legacy Management. Site Transition Process Upon Cleanup Completion Introduction Transition Process After environmental remediation is completed at a site and there is no continuing mission, responsibility for the site and the associated records are transferred to the U.S. Department of Energy (DOE) Office of Legacy Management for post-closure management. Where residual hazards (e.g., disposal cells, ground water contamination) remain, active long-term surveillance and maintenance will be required to ensure protection of human health and the environment. The DOE Office of Legacy Management (LM) established transition guidance for remediated sites that will transfer to LM for long-term surveillance and maintenance. The

166

Effect of sediment pulse grain size on sediment transport rates and bed mobility in gravel bed rivers  

E-Print Network [OSTI]

Effect of sediment pulse grain size on sediment transport rates and bed mobility in gravel bed] Sediment supply to gravel bed river channels often takes the form of episodic sediment pulses, and there is considerable interest in introducing sediment pulses in stream restorations to alter bed surface grain size

Venditti, Jeremy G.

167

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. It can be used to compute transient ground potential rise due to lightning or switching, and the ground impedance (i.e. resistance and reactance) at specified frequencies. This report, Volume 4, is a users manual and an installation and validation manual for the computer program TGRND (Transient GRouNDing System Analysis Program). This program computes transient ground potential rise resulting from lightning, switching, or other transient electric currents injected to a grounding system. The program also computes the impedance (i.e. resistance and reactance) of a grounding system as a function of frequency. This program can be utilized in an interactive or batch mode. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program TGRND and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

168

Fluidized Bed Technology - An R&D Success Story | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

An R&D Success Story An R&D Success Story Fluidized Bed Technology - An R&D Success Story In the early 1990s, POWER magazine called the development of fluidized bed coal combustors "the commercial success story of the last decade in the power generation business." The success, perhaps the most significant advance in coal-fired boiler technology in a half century, was achieved largely through the technology program of the U.S. Department of Energy's Office of Fossil Energy (and its predecessors). The Interior Department's Office of Coal Research, one of the forerunners of the Energy Department, began studying the fluidized bed combustion concept in the early 1960s. The original goal was to develop a compact "package" coal boiler that could be pre-assembled at the factory and shipped to a plant site (a lower cost

169

Atmospheric fluidized bed combustion (AFBC) plants: an operations and maintenance study  

SciTech Connect (OSTI)

The authors analyzed data from a fluidized bed boiler survey distributed during the spring of 2003 to develop appropriate AFBC (Atmospheric Fluidized Bed Combustion) performance benchmarks. The survey was sent to members of CIBO (Council of Industrial Boiler Owners), who sponsored the survey, as well as to other firms who had an operating AFBC boiler on-site. There were three primary purposes for the collection and analysis of the data contained in this fluidized bed boiler survey: (1) To develop AFBC benchmarks on technical, cost, revenue, and environmental issues; (2) to inform AFBC owners and operators of contemporary concerns and issues in the industry; (3) to improve decision making in the industry with respect to current and future plant start-ups and ongoing operations.

Jack A. Fuller; Harvie Beavers; Robert Bessette [West Virginia University, Morgantown, WV (United States). College of Business and Economics

2006-06-15T23:59:59.000Z

170

Ground Motion Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2nd Advanced ICFA Beam Dynamics Workshop 2nd Advanced ICFA Beam Dynamics Workshop on Ground Motion in Future Accelerators November 6 - 9, 2000 SLAC Coordinators: Andrei Seryi & Tor Raubenheimer Proceedings Updated June 26, 2001 Agenda and Presentations Workshop photos Summaries Useful links Poster Goals Introduction to the problems Structure Registration Registered participants Committees Location, Accommodations and Travel Workshop on Ground Motion in Future Accelerators A workshop was held at SLAC that was devoted to ground motion and its effects on future accelerators. Ground motion and vibration can be a limiting effect in synchrotron light sources, hadron circular colliders, and electron/positron linear colliders. Over the last several years, there has been significant progress in the understanding of the ground motion and its effects, however, there are

171

Cleanup Verification Package for the 618-8 Burial Ground  

SciTech Connect (OSTI)

This cleanup verification package documents completion of remedial action for the 618-8 Burial Ground, also referred to as the Solid Waste Burial Ground No. 8, 318-8, and the Early Solid Waste Burial Ground. During its period of operation, the 618-8 site is speculated to have been used to bury uranium-contaminated waste derived from fuel manufacturing, and construction debris from the remodeling of the 313 Building.

M. J. Appel

2006-08-10T23:59:59.000Z

172

UMTRA Ground Water Project  

Office of Legacy Management (LM)

... 7 Figure 3. Uranium Distribution from April 2013 Sampling at the Gunnison, Colorado, Processing Site ......

173

Remedial Costs for MTBE in Soil and Ground Water  

Science Journals Connector (OSTI)

The contamination of MTBE in ground water has introduced concerns about the increased cost of remediating MTBE/BTEX releases compared to remediating sites with BTEX only contamination. In an attempt to evaluat...

Barbara H. Wilson; John T. Wilson Ph.D.

2003-01-01T23:59:59.000Z

174

Ash bed level control system for a fixed-bed coal gasifier  

DOE Patents [OSTI]

An ash level control system is provided which incorporates an ash level meter to automatically control the ash bed level of a coal gasifier at a selected level. The ash level signal from the ash level meter is updated during each cycle that a bed stirrer travels up and down through the extent of the ash bed level. The ash level signal is derived from temperature measurements made by thermocouples carried by the stirrer as it passes through the ash bed and into the fire zone immediately above the ash bed. The level signal is compared with selected threshold level signal to determine if the ash level is above or below the selected level once each stirrer cycle. A first counter is either incremented or decremented accordingly. The registered count of the first counter is preset in a down counter once each cycle and the preset count is counted down at a selected clock rate. A grate drive is activated to rotate a grate assembly supporting the ash bed for a period equal to the count down period to maintain the selected ash bed level. In order to avoid grate binding, the controller provides a short base operating duration time each stirrer cycle. If the ash bed level drops below a selected low level or exceeds a selected high level, means are provided to notify the operator.

Fasching, George E. (Morgantown, WV); Rotunda, John R. (Fairmont, WV)

1984-01-01T23:59:59.000Z

175

Treatment of septage in sludge drying reed beds: a case study on pilot-scale beds  

E-Print Network [OSTI]

Treatment of septage in sludge drying reed beds: a case study on pilot-scale beds S. Troesch***, A systems by local authorities. This will result in a large increase of the quantity of sludge from septic to treat this sludge because they may have reached their nominal load or they are not so numerous in rural

Paris-Sud XI, Université de

176

Description of ground motion data processing codes: Volume 3  

SciTech Connect (OSTI)

Data processing codes developed to process ground motion at the Nevada Test Site for the Weapons Test Seismic Investigations Project are used today as part of the program to process ground motion records for the Nevada Nuclear Waste Storage Investigations Project. The work contained in this report documents and lists codes and verifies the ``PSRV`` code. 39 figs.

Sanders, M.L.

1988-02-01T23:59:59.000Z

177

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada.  

E-Print Network [OSTI]

??The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of… (more)

Lee, Si-Yong

2012-01-01T23:59:59.000Z

178

Bed material agglomeration during fluidized bed combustion. Technical progress report, September 30, 1992--December 31, 1992  

SciTech Connect (OSTI)

The purpose of this project is to determine the physical and chemical reactions which led to the undesired agglomeration of bed material during fluidized bed combustion and to relate these reactions to specific causes. Survey of industrial-scale fluidized bed combustors is being conducted to determine the occurrence of bed agglomeration and the circumstances under which agglomeration took place. This task should be finished by the end of February. Samples of bed material, agglomerate material, and boiler deposits are being requested from boiler operators as part of the survey. Once received, these sample will be analyzed to determine chemical and mineralogic composition. The bulk chemical determination will be performed using x-ray fluorescence and inductively coupled plasma-optical emission (ICP). Mineralogy will be detected by x-ray diffraction (XRD). Chemical and mineral reactions will be determined by scanning electron microscopy, optical microscopy, and electron microprobe.

Brown, R.C.; Dawson, M.R.; Noble, S.

1993-02-01T23:59:59.000Z

179

Seismic design technology for breeder reactor structures. Volume 1. Special topics in earthquake ground motion  

SciTech Connect (OSTI)

This report is divided into twelve chapters: seismic hazard analysis procedures, statistical and probabilistic considerations, vertical ground motion characteristics, vertical ground response spectrum shapes, effects of inclined rock strata on site response, correlation of ground response spectra with intensity, intensity attenuation relationships, peak ground acceleration in the very mean field, statistical analysis of response spectral amplitudes, contributions of body and surface waves, evaluation of ground motion characteristics, and design earthquake motions. (DLC)

Reddy, D.P.

1983-04-01T23:59:59.000Z

180

E-Print Network 3.0 - above-ground insect herbivores Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: -fold gradient of above ground plant production, strong differences in total soil nitrogen concentration... site (Table 1). Separate soil samples were taken in the...

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

National SCADA Test Bed | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cybersecurity » Energy Delivery Systems Cybersecurity Cybersecurity » Energy Delivery Systems Cybersecurity » National SCADA Test Bed National SCADA Test Bed Created in 2003, the National SCADA Test Bed (NSTB) is a one-of-a-kind national resource that draws on the integrated expertise and capabilities of the Argonne, Idaho, Lawrence Berkeley, Los Alamos, Oak Ridge, Pacific Northwest, and Sandia National Laboratories to address the cybersecurity challenges of energy delivery systems. Core and Frontier Research The NSTB core capabilities combine a network of the national labs' state-of-the-art operational system testing facilities with expert research, development, analysis, and training to discover and address critical security vulnerabilities and threats the energy sector faces. NSTB offers testing and research facilities, encompassing field-scale control

182

Particle withdrawal from fluidized bed systems  

DOE Patents [OSTI]

Method and apparatus for removing ash formed within, and accumulated at the lower portion of, a fluidized bed coal gasification reactor vessel. A supplemental fluidizing gas, at a temperature substantially less than the average fluidized bed combustion operating temperature, is injected into the vessel and upwardly through the ash so as to form a discrete thermal interface region between the fluidized bed and the ash. The elevation of the interface region, which rises with ash accumulation, is monitored by a thermocouple and interrelated with a motor controlled outlet valve. When the interface rises above the temperature indicator, the valve opens to allow removal of some of the ash, and the valve is closed, or positioned at a minimum setting, when the interface drops to an elevation below that of the thermocouple.

Salvador, Louis A. (Greensburg, PA); Andermann, Ronald E. (Arlington Heights, IL); Rath, Lawrence K. (Mt. Pleasant, PA)

1982-01-01T23:59:59.000Z

183

Fluidized bed selective pyrolysis of coal  

DOE Patents [OSTI]

The present invention discloses a process for the pyrolysis of coal which comprises the effective utilization of two zonal inclined fluidized beds, where said zones can be selectively controlled as to temperature and heating rate. The first zonal inclined fluidized bed serves as a dryer for crushed coal and additionally is controlled to selectively pyrolyze said coal producing substantially carbon dioxide for recycle use. The second zonal inclined fluidized bed further pyrolyzes the coal to gaseous, liquid and char products under controlled temperature and heating rate zones designed to economically integrate the product mix. The gas and liquid products are recovered from the gaseous effluent stream while the char which remains can be further treated or utilized in a subsequent process step.

Shang, Jer Y. (McLean, VA); Cha, Chang Y. (Golden, CO); Merriam, Norman W. (Laramie, WY)

1992-01-01T23:59:59.000Z

184

Fluidized bed combustion picks up steam  

SciTech Connect (OSTI)

Industrial interest in fluidized-bed combustion (FBC) continues, although the technology has been slow to enter the marketplace. Two FBC pilot plants funded by DOE and one commercial size project are in operation. FBC designs and commercial warranties are already available from the boiler industry, but 1981 was the first year to see significant numbers of privately-funded orders, now numbering 38 out of 50 boilers. Manufacturers are working on a universal boiler able to accept any fuel, but potential users are wary of new technology without a long-term demonstration of reliability and economics. There is interest in second generation designs, a new shallow-bed design suitable for retrofitting, and circulating bed types that decouple the combustion system from the heat removal system. (DCK)

Lawn, J.

1982-02-01T23:59:59.000Z

185

E-Print Network 3.0 - atmospheric fluidized bed Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

conditions... in a fluidized bed coater. The bed relative humidity and the droplet size of the coating aerosol were predicted... Fluidized bed coating ... Source: Groningen,...

186

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 2, is a users manual and an installation and validation manual for the computer program SMECC (Substation Maximum Earth Current Computation Program). This program analyzes the electric current distribution among grounded structures inside and outside a substation for different fault conditions. The fault conditions are automatically selected by the program, or they may be specified by the user, or both. The fault condition resulting in maximum substation earth current is identified and reported. Data requirements for this program are: ground impedance, transformer data, transmission line data, transmission line grounding impedances, etc. The program provides four types of standard outputs: (1) a report of voltages and current flow in the unfaulted system, (2) a brief report of the maximum ground potential rise (worst fault condition), (3) a summary report of all fault conditions which have been analyzed by the program, and (4) a detailed report of voltages and current flow for a selected set of fault conditions.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

187

PPPL Site Environmental Report  

SciTech Connect (OSTI)

Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratory’s Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on?site and is certified for analyzing radiological and non?radiological parameters through the New Jersey Department of Environmental Protection’s Laboratory Certification Program, Certification Number 12471. Non?radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories – QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the “Annual Site Environmental Report for 2011,” are documented and certified to be correct.

Virginia Finley, Robeert Sheneman and Jerry Levine

2012-12-21T23:59:59.000Z

188

Model for attrition in fluidized beds  

SciTech Connect (OSTI)

A model developed to predict the particle-size distribution and amount of fines generated during the attrition of particles in fluidized beds agrees well with experimental data for siderite iron ore and lignite char. Certain parameters used in the model are independent of particle size, orifice size, system pressure, bed weight, and attrition time, thus making the model suitable for scale-up purposes. Although the analysis was limited to a single jet with the attrition occurring at room temperature, the model can be extended to multi-jet, high-temperature operations.

Chen, T.P.; Sishtla, C.I.; Punwani, D.V.; Arastoopour, H.

1980-01-01T23:59:59.000Z

189

Mathematical modeling of fluidized bed reactors  

E-Print Network [OSTI]

III-B. Bubbling Bed Model (BBM). 26 TABLE OF CONTENTS (continued) CHAPTER III-8-1. BBM with Constant Bubble Size III-B-2. BBM with Variable Bubble Size III-C. Countercurrent Backmixing Model (CCBM). Page 28 29 30 III-C-1. CCBM with Constant... IV NUMERICAL RESULTS AND DISCUSSION. IV-A. Langmuir-Hinshelwood Type of Kinetics. IV-B. First Order Kinetics . 57 IV-B-1. Davidson and Harrison Model (DHM) . . 57 IV-8-2. Bubbling Bed Model (BBM). IV-B-3. Countercurrent Backmixing Model (CCBM...

Nasif, Nilufer Havva

2012-06-07T23:59:59.000Z

190

Evaluating the fluidized bed combustion options  

SciTech Connect (OSTI)

The proceedings from a conference on fluidized bed combustion are now available. The book discusses the immediate availability of atmospheric fluidized bed combustion technology as a practical, environmentally sound option for burning all grades of coal, wood, wood wastes, and biomass. The economics and technical fundamentals of atmospheric FBC are explained for the benefit of owners and managers of industrial boilers, boiler operators, architects/engineers, boiler manufacturers, and fuel suppliers. More than 15 FBC experts have contributed their expertise and experiences to the book.

Sheahan, R.T. (ed.)

1984-01-01T23:59:59.000Z

191

Quasi-three dimensional ground-water modeling of the hydrologic influence of paleozoic rocks on the ground-water table at Yucca Mountain, Nevada  

E-Print Network [OSTI]

The proposed high-level radioactive waste repository site at Yucca Mountain, Nevada, has created a need to understand the, ground-water system at the site. One of the important hydrologic characteristics is a steep gradient on the ground-water table...

Lee, Si-Yong

2012-06-07T23:59:59.000Z

192

Durability Testing of Fluidized Bed Steam Reforming Products  

SciTech Connect (OSTI)

Fluidized Bed Steam Reforming (FBSR) is being considered as a potential technology for the immobilization of a wide variety of radioactive wastes but especially aqueous high sodium wastes at the Hanford site, at the Idaho National Laboratory (INL), and at the Savannah River Site (SRS). The FBSR technology converts organic compounds to CO{sub 2} and H{sub 2}O, converts nitrate/nitrite species to N{sub 2}, and produces a solid residue through reactions with superheated steam, the fluidizing media. If clay is added during processing a ''mineralized'' granular waste form can be produced. The mineral components of the waste form are primarily Na-Al-Si (NAS) feldspathoid minerals with cage-like and ring structures and iron bearing spinel minerals. The cage and ring structured minerals atomically bond radionuclides like Tc{sup 99} and Cs{sup 137} and anions such as SO{sub 4}, I, F, and Cl. The spinel minerals appear to stabilize Resource Conservation and Recovery Act (RCRA) hazardous species such as Cr and Ni. Durability testing of the FBSR products was performed using ASTM C1285 (Product Consistency Test) and the Environmental Protection Agency (EPA) Toxic Characteristic Leaching Procedure (TCLP). The FBSR mineral products (bed and fines) evaluated in this study were found to be two orders of magnitude more durable than the Hanford Low Activity Waste (LAW) glass requirement of 2 g/m{sup 2} release of Na{sup +}. The PCT responses for the FBSR samples tested were consistent with results from previous FBSR Hanford LAW product testing. Differences in the response can be explained by the minerals formed and their effects on PCT leachate chemistry.

JANTZEN, CAROL M.; PAREIZS, JOHN M.; LORIER, TROY H.; MARRA, JAMES C.

2005-07-01T23:59:59.000Z

193

DOE-2 Simulations for Cuero and Karnes County Prison Sites: Draft Progress Report  

E-Print Network [OSTI]

The intent of this project was to model each of the large buildings at the Karnes County 2,250 bed and Cuero 1,000 bed prison sites with the DOE-2 building energy simulation program and to deliver a working model to the Texas Department of Criminal...

Bou-Saada, T. E.; Munger, B. K.; Saman, N. F.; Haberl, J. S.

194

Bed load equation evaluation based on alluvial river data, India  

Science Journals Connector (OSTI)

The rate of bed load transport in weight per unit width for ... material has been computed by collecting the field data of Tapi River, in the monsoon season ... of this paper is to estimate the bed load carried b...

S. M. Yadav; B. K. Samtani

2008-11-01T23:59:59.000Z

195

Design of a Pilot Plant Fluidized Bed Gasifier  

Science Journals Connector (OSTI)

This article presents the design principles for a biomass fluidized bed gasifier pilot plant. The fluidized bed gasifier has a nominal capacity of 400 kg ... most important parameters for the performance of the gasifier

K. Maniatis; V. Vassilatos; S. Kyritsis

1993-01-01T23:59:59.000Z

196

Current Status and Challenges within Fluidized Bed Combustion  

Science Journals Connector (OSTI)

Fluidized-bed technology is rapidly expanding. Today, more than 600 large (20+ MWth) FBC boilers with a total installed thermal capacity of ... beds (BFBC). The size of the boilers has increased steeply; the larg...

Mikko Hupa

2007-01-01T23:59:59.000Z

197

DOE - Office of Legacy Management -- Shiprock Mill Site - NM...  

Office of Legacy Management (LM)

Evaluation of the Trench 2 Groundwater Remediation System at the Shiprock, New Mexico, Legacy Management Site March 2009 Supplement to the Baseline Risk Assessment of Ground Water...

198

Fluidized bed gasification of agricultural residue  

E-Print Network [OSTI]

studied to develop a process which can convert organic waste matter into fuel gas. Hammond et al. (1974) described a fixed bed gasifier which operated at 1800 F (1256 K) and atmos- pheric pressure. When woodchips were used as the feed material...

Groves, John David

1979-01-01T23:59:59.000Z

199

Fluidized bed retorting of eastern oil shale  

SciTech Connect (OSTI)

This topical report summarizes the conceptual design of an integrated oil shale processing plant based on fluidized bed retorting of eastern New Albany oil shale. This is the fourth design study conducted by Foster Wheeler; previous design cases employed the following technologies: Fluidized bed rotating/combustion of Colorado Mahogany zone shale. An FCC concept of fluidized bed retorting/combustion of Colorado Mahogany zone shale. Directly heated moving vertical-bed process using Colorado Mahogany zone shale. The conceptual design encompasses a grassroots facility which processes run-of-mine oil shale into a syncrude oil product and dispose of the spent shale solids. The plant has a nominal capacity of 50,000 barrels per day of syncrude product, produced from oil shale feed having a Fischer Assay of 15 gallons per ton. Design of the processing units was based on non-confidential published information and supplemental data from process licensors. Maximum use of process and cost information developed in the previous Foster Wheeler studies was employed. The integrated plant design is described in terms of the individual process units and plant support systems. The estimated total plant investment is detailed by plant section and estimates of the annual operating requirements and costs are provided. In addition, process design assumptions and uncertainties are documented and recommendations for process alternatives, which could improve the overall plant economics, are discussed. 12 refs., 17 figs., 52 tabs.

Gaire, R.J.; Mazzella, G.

1989-03-01T23:59:59.000Z

200

Bed Bugs: Clinical Relevance and Control Options  

Science Journals Connector (OSTI)

...the treatment of field infestations...95) and cedar oil. The modes of...Best Yet cedar oil can kill all bed...the control of field infestations...complexes, as the gas cannot be tightly...Insecticides The cost to develop and...insects during spray operations. In laboratory...

Stephen L. Doggett; Dominic E. Dwyer; Pablo F. Peñas; Richard C. Russell

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Bed Bugs: Clinical Relevance and Control Options  

Science Journals Connector (OSTI)

...assist those who cannot pay the high price of control, bed bugs are set to...antigen and bronchial asthma in Egypt. J. Egypt. Soc. Parasitol. 21 : 735-746...Doggett, SL . 2009. Identification natural history, p 13-22. InSL Doggett...

Stephen L. Doggett; Dominic E. Dwyer; Pablo F. Peñas; Richard C. Russell

2012-01-01T23:59:59.000Z

202

Reversed flow fluidized-bed combustion apparatus  

DOE Patents [OSTI]

The present invention is directed to a fluidized-bed combustion apparatus provided with a U-shaped combustion zone. A cyclone is disposed in the combustion zone for recycling solid particulate material. The combustion zone configuration and the recycling feature provide relatively long residence times and low freeboard heights to maximize combustion of combustible material, reduce nitrogen oxides, and enhance sulfur oxide reduction.

Shang, Jer-Yu (Fairfax, VA); Mei, Joseph S. (Morgantown, WV); Wilson, John S. (Morgantown, WV)

1984-01-01T23:59:59.000Z

203

Public and Private Initiatives to Develop Ground Water Remediation Technologies in the U.S  

Science Journals Connector (OSTI)

Ground water at most hazardous waste sites in the ... most often the limiting factor for complete site remediation. Until recently, contaminants in surface soils ... were viewed as the only significant source of

Walter W. Kovalick Jr.; Rich Steimle

1996-01-01T23:59:59.000Z

204

Failure Analysis of Bed Coil Tube in an Atmospheric Fluidized Bed Combustion Boiler  

Science Journals Connector (OSTI)

The fluidized bed combustion (FBC) technology is being used in thermal power plants for steam generation. FBC plants are more flexible than conventional plants ... fuels may be used for firing. The FBC technology...

M. Venkateswara Rao; S. U. Pathak…

2014-06-01T23:59:59.000Z

205

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

206

Forecasting Hospital Bed Availability Using Simulation and Neural Networks  

E-Print Network [OSTI]

Forecasting Hospital Bed Availability Using Simulation and Neural Networks Matthew J. Daniels is a critical factor for decision-making in hospitals. Bed availability (or alternatively the bed occupancy in emergency departments, and many other important hospital decisions. To better enable a hospital to make

Kuhl, Michael E.

207

Heat exchanger support apparatus in a fluidized bed  

DOE Patents [OSTI]

A heat exchanger is mounted in the upper portion of a fluidized combusting bed for the control of the temperature of the bed. A support, made up of tubes, is extended from the perforated plate of the fluidized bed up to the heat exchanger. The tubular support framework for the heat exchanger has liquid circulated therethrough to prevent deterioration of the support.

Lawton, Carl W. (West Hartford, CT)

1982-01-01T23:59:59.000Z

208

Analysis/control of in-bed tube erosion phenomena in the fluidized bed combustion system. Final technical report  

SciTech Connect (OSTI)

Research is presented on erosion and corrosion of fluidized bed combustor component materials. The characteristics of erosion of in-bed tubes was investigated. Anti-corrosion measures were also evaluated.

Lee, Seong W.

1996-11-01T23:59:59.000Z

209

Enhanced dispersion in cylindrical packed beds  

Science Journals Connector (OSTI)

...method dispersivity geometry ground water heterogeneity hydrodynamics numerical models pollution pore water porosity remediation simulation tracers 2001 07...processes including groundwater remediation, secondary oil recovery...

2002-01-01T23:59:59.000Z

210

Evaluation of fluid bed heat exchanger optimization parameters. Final report  

SciTech Connect (OSTI)

Uncertainty in the relationship of specific bed material properties to gas-side heat transfer in fluidized beds has inhibited the search for optimum bed materials and has led to over-conservative assumptions in the design of fluid bed heat exchangers. An experimental program was carried out to isolate the effects of particle density, thermal conductivity, and heat capacitance upon fluid bed heat transfer. A total of 31 tests were run with 18 different bed material loads on 12 material types; particle size variations were tested on several material types. The conceptual design of a fluidized bed evaporator unit was completed for a diesel exhaust heat recovery system. The evaporator heat transfer surface area was substantially reduced while the physical dimensions of the unit increased. Despite the overall increase in unit size, the overall cost was reduced. A study of relative economics associated with bed material selection was conducted. For the fluidized bed evaporator, it was found that zircon sand was the best choice among materials tested in this program, and that the selection of bed material substantially influences the overall system costs. The optimized fluid bed heat exchanger has an estimated cost 19% below a fin augmented tubular heat exchanger; 31% below a commercial design fluid bed heat exchanger; and 50% below a conventional plain tube heat exchanger. The comparisons being made for a 9.6 x 10/sup 6/ Btu/h waste heat boiler. The fluidized bed approach potentially has other advantages such as resistance to fouling. It is recommended that a study be conducted to develop a systematic selection of bed materials for fluidized bed heat exchanger applications, based upon findings of the study reported herein.

Not Available

1980-03-01T23:59:59.000Z

211

Substation grounding programs  

SciTech Connect (OSTI)

The five volume report comprises the user manual, installation, and validation manual and an applications guide for the SGA (Substation Grounding Analysis) software package. SGA consists of four computer programs: (1) SOMIP, (2) SMECC, (3) SGSYS, and (4) TGRND. The first three programs provide a comprehensive analysis tool for the design of substation grounding systems to meet safety standards. The fourth program, TGRND, provides a state of the art analysis tool for computing transient ground potential rise and ground system impedance. This part of the report, Volume 1, is a users manual and an installation and validation manual for the computer program SOMIP (SOil Measurement Interpretation Program). This program computes the best estimate of the parameters of a two layer soil model from usual soil resistivity measurements. Four pin or three pin soil measurements can be accommodated. In addition, it provides error bounds on the soil parameters for a given confidence level. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program SOMIP and provides two test cases for validation purposes. 4 refs.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). School of Electrical Engineering)

1992-05-01T23:59:59.000Z

212

Ground-water contribution to dose from past Hanford Operations  

SciTech Connect (OSTI)

The Hanford Environmental Dose Reconstruction (HEDR) Project is being conducted to estimate radiation doses that populations and individuals could have received from Hanford Site operations from 1944 to the present. Four possible pathways by which radionuclides migrating in ground water on the Hanford Site could have reached the public have been identified: (1) through contaminated ground water migrating to the Columbia River; (2) through wells on or adjacent to the Hanford Site; (3) through wells next to the Columbia River downstream of Hanford that draw some or all of their water from the river (riparian wells); and (4) through atmospheric deposition resulting in contamination of a small watershed that, in turn, results in contamination of a shallow well or spring by transport in the ground water. These four pathways make up the ground-water pathway,'' which is the subject of this study. Assessment of the ground-water pathway was performed by (1) reviewing the existing extensive literature on ground water and ground-water monitoring at Hanford and (2) performing calculations to estimate radionuclide concentrations where no monitoring data were collected. Radiation doses that would result from exposure to these radionuclides were calculated.

Freshley, M.D.; Thorne, P.D.

1992-08-01T23:59:59.000Z

213

EA-1155: Ground-water Compliance Activities at the Uranium Mill Tailings  

Broader source: Energy.gov (indexed) [DOE]

5: Ground-water Compliance Activities at the Uranium Mill 5: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook, Wyoming EA-1155: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook, Wyoming SUMMARY This EA evaluates the environmental impacts for the proposal to comply with the Environmental Protection Agency's ground-water standards set forth in 40 CFR 192 at the Spook, Wyoming Uranium Mill Tailings Site by using the selected alternative stated in the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 1, 1997 EA-1155: Final Environmental Assessment Ground-water Compliance Activities at the Uranium Mill Tailings Site,

214

EA-1203: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford  

Broader source: Energy.gov (indexed) [DOE]

3: Trench 33 Widening in 218-W-5 Low-level Burial Ground, 3: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington EA-1203: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for the proposal to widen and operate the unused Trench 33 in the 218-W-5 Low-Level Burial Ground at the U.S. Department of Energy's Richland Operations Office. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 28, 1997 EA-1203: Finding of No Significant Impact Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington

215

Completed Sites  

Broader source: Energy.gov [DOE]

The Office of Environmental Management (EM) has been or is currently responsible for cleaning up sites across the United States. These sites were associated with the legacy of the nation’s nuclear...

216

DOE - Office of Legacy Management -- Naval Proving Ground - VA 0-01  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proving Ground - VA 0-01 Proving Ground - VA 0-01 FUSRAP Considered Sites Site: NAVAL PROVING GROUND (VA.0-01 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Dahlgren , Virginia VA.0-01-1 Evaluation Year: 1987 VA.0-01-1 Site Operations: Site operations were not specified; this site was identified on the 1954 Accountable Station Lists. VA.0-01-1 VA.0-01-2 Site Disposition: Eliminated - Referred to DOD VA.0-01-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD VA.0-01-1 Also see Documents Related to NAVAL PROVING GROUND VA.0-01-1 - DOE Letter; Fiore to Schafer; Referral of DOD or Former

217

Coal Bed Methane Protection Act (Montana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Coal Bed Methane Protection Act (Montana) Coal Bed Methane Protection Act (Montana) Coal Bed Methane Protection Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Tribal Government Institutional Fuel Distributor Program Info State Montana Program Type Environmental Regulations Provider Montana Department of Natural Resources and Conservation The Coal Bed Methane Protection Act establishes a long-term coal bed methane protection account and a coal bed methane protection program for the purpose of compensating private landowners and water right holders for damage to land and to water quality and availability that is attributable to the development of coal bed methane wells. The Act aims to provide for

218

TRACKING SITE  

Energy Science and Technology Software Center (OSTI)

003235MLTPL00 AASG Geothermal Data submissions tracking application and site.  https://github.com/usgin/aasgtrack 

219

Coal Bed Sequestration of Carbon Dioxide  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COAL BED SEQUESTRATION OF CARBON DIOXIDE COAL BED SEQUESTRATION OF CARBON DIOXIDE R. Stanton (rstanton@usgs.gov; 703-648-6462) U.S. Geological Survey MS 956 National Center Reston, VA 20192 R. Flores (rflores@usgs.gov; 303-236-7774) U.S. Geological Survey MS 939, Denver Federal Center Denver, CO 80225 P.D. Warwick (pwarwick@usgs.gov; 703-648-6469) H. Gluskoter (halg@usgs.gov; 703-648-6429) U.S. Geological Survey MS 956 National Center Reston, VA 20192 G.D. Stricker (303-236-7763) U.S. Geological Survey MS 939, Denver Federal Center Denver, CO 80225 Introduction Geologic sequestration of CO 2 generated from fossil fuel combustion may be an environmentally attractive method to reduce the amount of greenhouse gas emissions. Of the geologic options, sequestering CO

220

Fluidized bed boiler having a segmented grate  

DOE Patents [OSTI]

A fluidized bed furnace (10) is provided having a perforate grate (9) within a housing which supports a bed of particulate material including some combustibles. The grate is divided into a plurality of segments (E2-E6, SH1-SH5, RH1-RH5), with the airflow to each segment being independently controlled. Some of the segments have evaporating surface imbedded in the particulate material above them, while other segments are below superheater surface or reheater surface. Some of the segments (E1, E7) have no surface above them, and there are ignitor combustors (32, 34) directed to fire into the segments, for fast startup of the furnace without causing damage to any heating surface.

Waryasz, Richard E. (Longmeadow, MA)

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Fluidized bed gasification of extracted coal  

DOE Patents [OSTI]

Coal or similar carbonaceous solids are extracted by contacting the solids in an extraction zone (12) with an aqueous solution having a pH above 12.0 at a temperature between 65.degree. C. and 110.degree. C. for a period of time sufficient to remove bitumens from the coal into said aqueous solution and the extracted solids are then gasified at an elevated pressure and temperature in a fluidized bed gasification zone (60) wherein the density of the fluidized bed is maintained at a value above 160 kg/m.sup.3. In a preferred embodiment of the invention, water is removed from the aqueous solution in order to redeposit the extracted bitumens onto the solids prior to the gasification step.

Aquino, Dolores C. (Houston, TX); DaPrato, Philip L. (Westfield, NJ); Gouker, Toby R. (Baton Rouge, LA); Knoer, Peter (Houston, TX)

1986-01-01T23:59:59.000Z

222

Pulsed atmospheric fluidized bed combustor apparatus  

DOE Patents [OSTI]

A pulsed atmospheric fluidized bed reactor system is disclosed and claimed along with a process for utilization of same for the combustion of, e.g. high sulfur content coal. The system affords a economical, ecologically acceptable alternative to oil and gas fired combustors. The apparatus may also be employed for endothermic reaction, combustion of waste products, e.g., organic and medical waste, drying materials, heating air, calcining and the like.

Mansour, Momtaz N. (Columbia, MD)

1993-10-26T23:59:59.000Z

223

Ground Water Surveillance Monitoring Implementation Guide for Use with DOE O 450.1, Environmental Protection Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide assists DOE sites in establishing and maintaining surveillance monitoring programs to detect future impacts on ground water resources from site operations, to track existing ground water contamination, and to assess the potential for exposing the general public to site releases. Canceled by DOE N 251.82.

2004-06-24T23:59:59.000Z

224

EA-1276: Widening Trench 36 of the 218-E-12B Low-level Burial Ground,  

Broader source: Energy.gov (indexed) [DOE]

76: Widening Trench 36 of the 218-E-12B Low-level Burial 76: Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site, Richland, Washington EA-1276: Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for the proposal to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste at the U.S. Department of Energy Hanford Site. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 11, 1999 EA-1276: Finding of No Significant Impact Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site, Richland, Washington February 11, 1999 EA-1276: Final Environmental Assessment Widening Trench 36 of the 218-E-12B Low-level Burial Ground, Hanford Site,

225

GROUND-WATER CONTRIBUTION TO DOSE FROM PAST HANFORD OPERATIONS  

SciTech Connect (OSTI)

The Hanford Environmental Dose Reconstruction (HEOR) Project is being conducted to estimate radiation doses that populations and individuals could have received from Hanford Site operations from 1944 to the present. Four possible pathways by which radionuclides originating in ground water on the Hanford Site could have reached the public have been identified: 1) through contaminated ground water migrating to the Columbia River; 2) through wells on or adjacent to the Hanford Site; 3) through wells that draw some or all of their water from the Columbia River (riparian wells); and 4) through atmospheric deposition resulting in the contamination of a small watershed that, in turn, results in contamination of a shallow well or spring. These four pathways make up the "ground-water pathway ," which is the subject of this study. The objective of the study was to assess the extent to which the groundwater pathway contributed to radiation doses that populations or individuals may have received from past operations at Hanford. The assessment presented in this report was performed by 1) reviewing the extensive ?literature on ground water and ground-water monitoring at Hanford and 2) performing simple calculations to estimate radionuclide concentrations in ground water and the Columbia River resulting from ground-water discharge. Radiation doses that would result from exposure to this ground water and surface water were calculated. The study conclusion is that the ground-water pathways did not contribute significantly to dose. Compared with background radiation in the TriCities {300 mrem/yr), estimated doses are small: 0.02 mrem/yr effective dose equivalent from discharge of contaminated ground water to the Columbia River; 1 mrem/yr effective dose equivalent from Hanford Site wells; 11 mrem/yr effective dose equivalent from riparian wells; and 1 mrem/yr effective dose equivalent from the watershed. Because the estimated doses are so small, the recommendation is that further work on the ground-water pathway be limited to tracking ongoing ground-water studies at the Hanford Site.

Freshley, M. D.; Thorne, P. D.

1992-01-01T23:59:59.000Z

226

An innovative bed temperature-oriented modeling and robust control of a circulating fluidized bed combustor  

Science Journals Connector (OSTI)

Circulating fluidized bed (CFB) combustion systems are increasingly used as superior coal burning systems in power generation due to their higher efficiency and lower emissions. However, because of their non-linearity and complex behavior, it is difficult to build a comprehensive model that incorporates all the system dynamics. In this paper, a mathematical model of the circulating fluidized bed combustion system based on mass and energy conservation equations was successfully extracted. Using these correlations, a state space dynamical model oriented to bed temperature has been obtained based on subspace method. Bed temperature, which influences boiler overall efficiency and the rate of pollutants emission, is one of the most significant parameters in the operation of these types of systems. Having dynamic and parametric uncertainties in the model, a robust control algorithm based on linear matrix inequalities (LMI) have been applied to control the bed temperature by input parameters, i.e. coal feed rate and fluidization velocity. The controller proposed properly sets the temperature to our desired range with a minimum tracking error and minimizes the sensitivity of the closed-loop system to disturbances caused by uncertainties such as change in feeding coal, while the settling time of the system is significantly decreased.

Aboozar Hadavand; Ali Akbar Jalali; Parviz Famouri

2008-01-01T23:59:59.000Z

227

SSA Old Jack Pine Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSA-OJP) SSA-OJP) View an aerial photo-map of the SSA-OJP site. The road to the OJP site The flux tower and the hut The truss tower connected to the flux tower by cables The flux tower< The canopy access tower The SRC meteorology tower The under-canopy flux station The moss-covered jack pine tree The ground cover at the OJP site Aerial view of the SSA-Old Jack Pine site looking to the northeast. The Flux Tower at SSA-Old Jack Pine site. The Sodar site. The NOAA sodar located near the Old Jack Pine in the SSA. The under-canopy radiation track This is a 14 meter-long metal track in the forest with a mobile radiometer out on an arm on a small motorized cart (visible at the center of the picture) that travels through the forest taking measurements of PAR and net radiation.

228

Ground Squirrels and Gophers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Squirrels and Gophers Squirrels and Gophers Nature Bulletin No. 224-A April 2, 1966 Forest Preserve District of Cook County Seymour Simon, President Roland F. Eisenbeis, Supt. of Conservation GROUND SQUIRRELS AND GOPHERS On sunny summer days, a dusty-colored animal with yellowish and brown stripes, about the size of a small rat, often may be noticed creeping through the grass of prairies, pastures, golf courses or lawns. Watch him. He pauses every few feet to sit up, look and listen for a moment. Nervous and timid, he crouches low at every distant sound or passing shadow. Startle him and he scurries away, and then may suddenly halt and freeze, bolt upright, as stiff and straight as a stake driven in the ground. If approached, he gives a loud shrill trilling whistle and, with a flip of his tail, pops out of sight. Watch that spot closely and, in less than a minute, a snaky head appears. Be quiet. He has many enemies above ground and he also has a lot of curiosity. Presently he sits up upon his haunches again.

229

The prediction of the effectiveness of interceptor trenches in the remediation of ground-water contamination by petroleum hydrocarbons  

E-Print Network [OSTI]

. LIST OF FIGURES. . LIST OF TABLES INTRODUCTION. . Objectives. Previous Works Methods . . . . . . . . . . . . . . . . . . SITE DESCRIPTIONS . . Site A. Site B. Site C . . . FIELD STUDIES. . . Site A. . Site B. TABLE OF CONTENTS Page 15... . . 68 . 71 --. . 73 -- 77 Figure LIST OF FIGURES Page 1. General layout of Site A showing ground-flow in the vicinity of the interceptor trench 2. Schematic cross-sectional view of the interceptor trench at Site A. . . . . . . . . . . . . . . 10...

Mast, Mary Katherine

2012-06-07T23:59:59.000Z

230

Inovative Site Characteristics of Microbes T.C. Hazen*1  

E-Print Network [OSTI]

of more than 1000 ground water samples, and over 30 different measurements of more than 3000 soil gas was designed to demonstrate in situ bioremediation of ground water and sediment contaminated with chlorinated sound remediation technologies available at sites where it will work. The Savannah River Site has just

Hazen, Terry

231

Erosion of heat exchanger tubes in fluidized beds  

SciTech Connect (OSTI)

This final report describes the activities of the 3-year project entitled Erosion of Heat Exchanger Tubes In Fluidized Beds.'' which was completed at the end of 1990. Project accomplishments include the collection of a substantial body of wear data In a 24in. [times] 24in. fluidized bed, comparative wear results In a 6in. [times] 6in. fluidized bed, the development of a dragometer and the collection of a comprehensive set of drag force data in the 24in. [times] 24in. bed, Fast Fourier Transform (FFT) analysis of bubble probe data to establish dominant bubble frequencies in the 24in. [times] 24in. bed, the use of a heat flux gauge for measurement of heat transfer coefficients in the 24in. [times] 24in. bed and the modeling of the tube wear in the 24in. [times] 24in. bed. Analysis of the wear data from the 24in. square bed indicates that tube wear increases with increase in superficial velocity, and with increase in tube height. The latter effect is a result of the tubes higher up in the bed seeing greater movement of dense phase than tubes lower down In the bed. In addition, tube wear was found to decrease with increase in particle size, for constant superficial velocity. Three models of tube wear were formulated and provided acceptable prediction of wear when compared with the experimental data.

Johnson, E.K.; Flemmer, R.L.C.

1991-01-01T23:59:59.000Z

232

Ground Water Recovery and Treatment  

Science Journals Connector (OSTI)

Until the environmental revolution, the only ground water that was routinely treated to remove contamination was the impacted ground water that was extracted for beneficial use. With ... the recognition that cont...

Tie Li Ph.D.; Raaj U. Patel P.G.; David K. Ramsden Ph.D.…

2003-01-01T23:59:59.000Z

233

NSA-Fen Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NSA-Fen) NSA-Fen) The Fen from the air, looking North. You can see the boardwalk, the hut, and the size of the bog. The road (Highway 391) is visible at the top. The round "crater" near the base of the boardwalk on the right is a collapsed palsa. View an aerial photo-map of the NSA-Fen site. The ground cover on the Fen itself The hut and flux tower The Fen site from the shore looking toward the hut The Fen site flux tower The boardwalk in the Fen, looking back at the shore The generator shed and the storage tent The NSA-Fen site from the air during IFC-2. Top of image is to Southeast. The NSA-Fen site in September (IFC-3) 1994 looking to the southeast. The tower is at the end of the boardwalk in right center of image with the hut near the center. The boardwalk connects to the far border at left center of the slide. Note that the tamarack (deciduous evergreen) within the fen has its fall colors.

234

In-bed tube bank for a fluidized-bed combustor  

DOE Patents [OSTI]

An in-bed tube bank (10) for a fluidized bed combustor. The tube bank (10) of the present invention comprises one or more fluid communicating boiler tubes (30) which define a plurality of selectively spaced boiler tube sections (32). The tube sections (32) are substantially parallel to one another and aligned in a common plane. The tube bank (10) further comprises support members (34) for joining adjacent tube sections (32), the support members (34) engaging and extending along a selected length of the tube sections (32) and spanning the preselected space therebetween.

Hemenway, Jr., Lloyd F. (Morgantown, WV)

1990-01-01T23:59:59.000Z

235

Ground Water Protection (North Dakota) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ground Water Protection (North Dakota) Ground Water Protection (North Dakota) Ground Water Protection (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State North Dakota Program Type Siting and Permitting North Dakota has a degradation prevention program for groundwater protection, with standards established by the Department of Health. This section addresses groundwater standards, quality monitoring, notification

236

EIS-0289: JEA Circulating Fluidized Bed Combustor Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

289: JEA Circulating Fluidized Bed Combustor Project 289: JEA Circulating Fluidized Bed Combustor Project EIS-0289: JEA Circulating Fluidized Bed Combustor Project SUMMARY This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 7, 2000 EIS-0289: Record of Decision JEA Circulating Fluidized Bed Combustor Project, Jacksonville, Duval County, FL June 1, 2000 EIS-0289: Final Environmental Impact Statement JEA Circulating Fluidized Bed Combustor Project August 1, 1999 EIS-0289: Draft Environmental Impact Statement JEA Circulating Fluidized Bed Combustor

237

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill associated with the historical operations of a vacuum pump oil recovery system at the E-MAD facility.

K. B. Campbell

2001-11-01T23:59:59.000Z

238

Second-generation pressurized fluidized bed combustion  

SciTech Connect (OSTI)

Under the sponsorship of the United States Department of Energy, Foster Wheeler Corporation is developing second-generation pressurized fluidized bed combustion (PFBC) power plant technology that will enable this type of plant to operate with net plant efficiencies in the range of 43 to 46 percent (based on the higher heating value of the coal), with a reduction in the cost of electricity of at least 20 percent. A three-phase program is under way. Its scope encompasses the conceptual design of a commercial plant through the process of gathering needed experimental test data to obtain design parameters.

Wolowodiuk, W.; Robertson, A.

1992-01-01T23:59:59.000Z

239

Second-generation pressurized fluidized bed combustion  

SciTech Connect (OSTI)

Under the sponsorship of the United States Department of Energy, Foster Wheeler Corporation is developing second-generation pressurized fluidized bed combustion (PFBC) power plant technology that will enable this type of plant to operate with net plant efficiencies in the range of 43 to 46 percent (based on the higher heating value of the coal), with a reduction in the cost of electricity of at least 20 percent. A three-phase program is under way. Its scope encompasses the conceptual design of a commercial plant through the process of gathering needed experimental test data to obtain design parameters.

Wolowodiuk, W.; Robertson, A.

1992-05-01T23:59:59.000Z

240

Methanol synthesis in a trickle bed reactor  

E-Print Network [OSTI]

kinetic models for methanol synthesis under the assumption that the rate limiting step was the reaction between an adsorbed CO molecule and two adsorbed H2 molecules. The experiment was conducted over a Cu/ZnO/Cr~03 catalyst in a fixed bed reactor... to account for the large degree of initial deactivation. However, Rozovskii (1980) claimed the opposite and stated that methanol is made from carbon dioxide and no methanol is produced from Hz/CO mixtures over the Cu/ZnO/Alz03 catalyst. Liu et al. (1984...

Tjandra, Sinoto

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Particle Receiver Integrated with Fludized Bed  

Broader source: Energy.gov [DOE]

This fact sheet describes a project awarded under the DOE's 2012 SunShot Concentrating Solar Power R&D award program to NREL which features a particle receiver with a fluidized bed. The research team is working to develop a technology that uses gas/solid, two-phase flow as a heat-transfer fluid and separated, stable, solid particles as a thermal energy storage medium. This project provides a pathway for CSP plants to increase their solar-to-electric conversion efficiency and reduce costs in the areas of solar collection from the solar field to the receiver, energy conversion systems, and thermal energy storage.

242

CIRCULATING MOVING BED COMBUSTION PROOF OF CONCEPT  

SciTech Connect (OSTI)

Circulating Moving Bed (CMB) combustion technology has its roots in traditional circulating fluidized bed technology and involves a novel method of solid fuel combustion and heat transfer. CMB technology represents a step change in improved performance and cost relative to conventional PC and FBC boilers. The CMB heat exchanger preheats the energy cycle working fluid, steam or air, to the high temperature levels required in systems for advanced power generation. Unique features of the CMB are the reduction of the heat transfer surfaces by about 60% as a result of the enhanced heat transfer rates, flexibility of operation, and about 30% lower cost over existing technology. The CMB Phase I project ran from July 2001 through March 2003. Its objective was to continue development of the CMB technology with a series of proof of concept tests. The tests were conducted at a scale that provided design data for scale up to a demonstration plant. These objectives were met by conducting a series of experiments in ALSTOM Power’s Multi-use Test Facility (MTF). The MTF was modified to operate under CMB conditions of commercial interest. The objective of the tests were to evaluate gas-to-solids heat transfer in the upper furnace, assess agglomeration in the high temperature CMB bubbling bed, and evaluate solids-to-tube heat transfer in the moving bed heat exchanger. The Phase I program results showed that there are still some significant technical uncertainties that needed to be resolved before the technology can be confidently scaled up for a successful demonstration plant design. Work remained in three primary areas: • scale up of gas to solid heat transfer • high temperature finned surface design • the overall requirements of mechanical and process design. The CMB Phase II workscope built upon the results of Phase I and specifically addressed the remaining technical uncertainties. It included a scaled MTF heat transfer test to provide the necessary data to scale up gas-to-solids heat transfer. A stress test rig was built and tested to provide validation data for a stress model needed to support high temperature finned surface design. Additional cold flow model tests and MTF tests were conducted to address mechanical and process design issues. This information was then used to design and cost a commercial CMB design concept. Finally, the MBHE was reconfigured into a slice arrangement and tested for an extended duration at a commercial CFB plant.

Jukkola, Glen

2010-06-30T23:59:59.000Z

243

The LOFT Ground Segment  

E-Print Network [OSTI]

LOFT, the Large Observatory For X-ray Timing, was one of the ESA M3 mission candidates that completed their assessment phase at the end of 2013. LOFT is equipped with two instruments, the Large Area Detector (LAD) and the Wide Field Monitor (WFM). The LAD performs pointed observations of several targets per orbit (~90 minutes), providing roughly ~80 GB of proprietary data per day (the proprietary period will be 12 months). The WFM continuously monitors about 1/3 of the sky at a time and provides data for about ~100 sources a day, resulting in a total of ~20 GB of additional telemetry. The LOFT Burst alert System additionally identifies on-board bright impulsive events (e.g., Gamma-ray Bursts, GRBs) and broadcasts the corresponding position and trigger time to the ground using a dedicated system of ~15 VHF receivers. All WFM data are planned to be made public immediately. In this contribution we summarize the planned organization of the LOFT ground segment (GS), as established in the mission Yellow Book 1 . We...

Bozzo, E; Argan, A; Barret, D; Binko, P; Brandt, S; Cavazzuti, E; Courvoisier, T; Herder, J W den; Feroci, M; Ferrigno, C; Giommi, P; Götz, D; Guy, L; Hernanz, M; Zand, J J M in't; Klochkov, D; Kuulkers, E; Motch, C; Lumb, D; Papitto, A; Pittori, C; Rohlfs, R; Santangelo, A; Schmid, C; Schwope, A D; Smith, P J; Webb, N A; Wilms, J; Zane, S

2014-01-01T23:59:59.000Z

244

Integrated Gasification Combined Cycle Based on Pressurized Fluidized Bed Gasification  

Science Journals Connector (OSTI)

Enviropower Inc. has developed a modern power plant concept based on an integrated pressurized fluidized bed gasification and gas turbine combined cycle (IGCC)....

Kari Salo; J. G. Patel

1997-01-01T23:59:59.000Z

245

German Pebble Bed Research Reactor Highly Enriched Uranium (HEU...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Potential Acceptance and Disposition of German Pebble Bed Research Reactor Highly Enriched Uranium (HEU) Fuel Environmental Assessment Maxcine Maxted, DOE-SR Used Nuclear Fuel...

246

Growth and flowering of bedding plants grown in landscape bed amended with hydrophilic polymers  

E-Print Network [OSTI]

Field study one incorporated hydrophilic polymers into field plots of bedding plants including 25, 50, 75, or 1 00 lb/1 00oft2 . Data recorded during the growing season included flower number, visual rating, soil moisture and temperature, and plant...

Boatright, Jennifer Lynn

1994-01-01T23:59:59.000Z

247

Bed-inventory Overturn Mechanism for Pant-leg Circulating Fluidized Bed Boilers  

E-Print Network [OSTI]

A numerical model was established to investigate the lateral mass transfer as well as the mechanism of bed-inventory overturn inside a pant-leg circulating fluidized bed (CFB), which are of great importance to maintain safe and efficient operation of the CFB. Results show that the special flow structure in which the solid particle volume fraction along the central line of the pant-leg CFB is relative high enlarges the lateral mass transfer rate and make it more possible for bed inventory overturn. Although the lateral pressure difference generated from lateral mass transfer inhibits continuing lateral mass transfer, providing the pant-leg CFB with self-balancing ability to some extent, the primary flow rate change due to the outlet pressure change often disable the self-balancing ability by continually enhancing the flow rate difference. As the flow rate of the primary air fan is more sensitive to its outlet pressure, it is easier to lead to bed inventory overturn. While when the solid particle is easier to c...

Wang, Zhe; Yang, Zhiwei; West, Logan; Li, Zheng

2011-01-01T23:59:59.000Z

248

What is a bed bug? Bed bugs are small, oval, reddish brown, non-  

E-Print Network [OSTI]

zippers. Thus, experts recommend using hard luggage that closes tight. ·Protectyourclothes. Seal your clothes inside air-tight bags. ·Protectyourluggage. Never set your luggage on the bed or on a couch. Put. ·Treatyourluggagebeforeyoustoreit. After you have unpacked, vacuum your luggage thoroughly. Also, if it is hot outside, you can seal

Almor, Amit

249

Construction Summary and As-Built Report for Ground Water Treatment System  

Broader source: Energy.gov (indexed) [DOE]

Construction Summary and As-Built Report for Ground Water Treatment Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site More Documents & Publications Dispersivity Testing of Zero-Valent Iron Treatment Cells: Monticello, Utah, November 2005 Through February 2008 Third (March 2006) Coring and Analysis of Zero-Valent Iron Permeable Reactive Barrier, Monticello, Utah Performance Assessment and Recommendations for Rejuvenation of a Permeable

250

Updated Site Response Analyses for the Waste Treatment Plant, DOE Hanford, Site, Washington.  

SciTech Connect (OSTI)

This document describes the calculations performed to develop updated relative amplification functions for the Waste Treatment and Immobilization Plant (WTP) facility at the DOE Hanford Site, Washington State. The original 2,000-year return period design spectra for the WTP were based on the results of a probabilistic seismic hazard analysis (PSHA) performed for the DOE Hanford Site by Geomatrix (1996). Geomatrix (1996) performed the PSHA using empirical soil-site ground motion models based primarily on recordings from California. As part of that study, site response analyses were performed to evaluate ground motions at the Hanford sites and California deep soil sites. As described in Appendix A of Geomatrix (1996), characteristic site profiles and dynamic soil properties representative of conditions at various Hanford sites and California deep soil strong motion recording stations were defined. Relative site responses of the Hanford profiles and California profiles were then compared. Based on the results of those site response analyses, it was concluded that ground motions at the Hanford sites underlain by deep soil deposits are similar in character to those on California deep soil sites and it was judged appropriate to use empirical deep soil site attenuation relationships based primarily on California ground motion data to develop design spectra for the Hanford sites. In a subsequent analysis, Geomatrix (2003) updated the site response analyses of Geomatrix (1996, Appendix A) to incorporate randomization of the California and Hanford profiles. The results of that analysis also led to the conclusion that the response of the Hanford profiles was similar to the response of deep soil sites in California.

Youngs, Robert R.

2007-06-29T23:59:59.000Z

251

Proceedings of the 1987 international conference on fluidized bed combustion: FBC comes of age  

SciTech Connect (OSTI)

This book presents the papers given at a conference on fluidized-bed combustors. Topics considered at the conference included fluidized bed boilers for utility applications, coal-fired systems, boiler retrofit, demonstration programs, atmospheric fluidized bed applications at the Tennessee Valley Authority, pressurized fluidized bed applications, waste disposal, adsorbents, fluid mechanics in fluidized beds, hydrodynamics, desulfurization, environmental issues, and advanced concepts.

Mustonen, J.P.

1987-01-01T23:59:59.000Z

252

Geology of the Source Physics Experiment Site, Climax Stock, Nevada National Security Site  

SciTech Connect (OSTI)

A test bed for a series of chemical explosives tests known as Source Physics Experiments (SPE) was constructed in granitic rock of the Climax stock, in northern Yucca Flat at the Nevada National Security Site in 2010-2011. These tests are sponsored by the U.S. Department of Energy, National Nuclear Security Administration's National Center for Nuclear Security. The test series is designed to study the generation and propagation of seismic waves, and will provide data that will improve the predictive capability of calculational models for detecting and characterizing underground explosions. Abundant geologic data are available for the area, primarily as a result of studies performed in conjunction with the three underground nuclear tests conducted in the Climax granite in the 1960s and a few later studies of various types. The SPE test bed was constructed at an elevation of approximately 1,524 meters (m), and consists of a 91.4-centimeter (cm) diameter source hole at its center, surrounded by two rings of three 20.3-cm diameter instrument holes. The inner ring of holes is positioned 10 m away from the source hole, and the outer ring of holes is positioned 20 m from the source hole. An initial 160-m deep core hole was drilled at the location of the source hole that provided information on the geology of the site and rock samples for later laboratory testing. A suite of geophysical logs was run in the core hole and all six instruments holes to obtain matrix and fracture properties. Detailed information on the character and density of fractures encountered was obtained from the borehole image logs run in the holes. A total of 2,488 fractures were identified in the seven boreholes, and these were ranked into six categories (0 through 5) on the basis of their degree of openness and continuity. The analysis presented here considered only the higher-ranked fractures (ranks 2 through 5), of which there were 1,215 (approximately 49 percent of all fractures identified from borehole image logs). The fractures were grouped into sets based on their orientation. The most ubiquitous fracture set (50 percent of all higher-ranked fractures) is a group of low-angle fractures (dips 0 to 30 degrees). Fractures with dips of 60 to 90 degrees account for 38 percent of high-ranked fractures, and the remaining 12 percent are fractures with moderate dips (30 to 60 degrees). The higher-angle fractures are further subdivided into three sets based on their dip direction: fractures of Set 1 dip to the north-northeast, fractures of Set 2 dip to the south-southwest, and Set 3 consists of high-angle fractures that dip to the southeast and strike northeast. The low-angle fractures (Set 4) dip eastward. Fracture frequency does not appear to change substantially with depth. True fracture spacing averages 0.9 to 1.2 m for high-angle Sets 1, 2, and 3, and 0.6 m for Set 4. Two significant faults were observed in the core, centered at the depths of 25.3 and 32.3 m. The upper of these two faults dips 80 degrees to the north-northeast and, thus, is related to the Set-1 fractures. The lower fault dips 79 degrees to the south-southwest and is related to SPE Set-2 fractures. Neither fault has an identifiable surface trace. Groundwater was encountered in all holes drilled on the SPE test bed, and the fluid level averaged about 15.2 to 18.3 m below ground surface. An informal study of variations in the fluid level in the holes conducted during various phases of construction of the test bed concluded that groundwater flow through the fractured granitic rocks is not uniform, and appears to be controlled by variations in the orientation and degree of interconnectedness of the fractures. It may also be possible that an aplite dike or quartz vein may be present in the test bed, which could act as a barrier to groundwater flow and, thus, could account for anisotropy seen in the groundwater recovery measurements.

Townsend, M., Prothro, L. B., Obi, C.

2012-03-15T23:59:59.000Z

253

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Air port Strainer Box, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the US Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, Nevada Operations Office

1999-06-10T23:59:59.000Z

254

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

US DOE/Nevada Operations Office

1999-06-10T23:59:59.000Z

255

An analysis of ilmenite particles used as bed material for combustion of biomass in a CFB boiler.  

E-Print Network [OSTI]

??Combustion of biomass in a fluidized bed boiler with silica sand as bed material is related to problems such as agglomeration of bed material and… (more)

Corcoran, Angelica

2013-01-01T23:59:59.000Z

256

Ground Water Protection Programs Implementation Guide for Use with DOE O 450.1, Environmental Protection Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides a description of the elements of an integrated site-wide ground water protection program that can be adapted to unique physical conditions and programmatic needs at each DOE site. Canceled by DOE N 251.82.

2005-05-05T23:59:59.000Z

257

Ground potential rise monitor  

DOE Patents [OSTI]

A device and method for detecting ground potential rise (GPR) comprising positioning a first electrode and a second electrode at a distance from each other into the earth. The voltage of the first electrode and second electrode is attenuated by an attenuation factor creating an attenuated voltage. The true RMS voltage of the attenuated voltage is determined creating an attenuated true RMS voltage. The attenuated true RMS voltage is then multiplied by the attenuation factor creating a calculated true RMS voltage. If the calculated true RMS voltage is greater than a first predetermined voltage threshold, a first alarm is enabled at a local location. If user input is received at a remote location acknowledging the first alarm, a first alarm acknowledgment signal is transmitted. The first alarm acknowledgment signal is then received at which time the first alarm is disabled.

Allen, Zachery W. (Mandan, ND); Zevenbergen, Gary A. (Arvada, CO)

2012-04-03T23:59:59.000Z

258

Limiting factors in ground water remediation  

Science Journals Connector (OSTI)

If one is charged with restoring a contaminated aquifer today, the procedure of pumping contaminated water to the surface for treatment and discharge is most often the state-of-practice technology. The perceived success of pump-and-treat technology can be misleading if the hydrology and contaminant characteristics at the site are not adequately understood. A failure to understand the processes controlling contaminant transport can result in extremely long pumping periods and, consequently, costly and inefficient remediation. Effects of tailing, sorption, and residual immiscible fluids on time required for pump-and-treat remediation of ground water are discussed.

Clinton W. Hall; Jeffrey A. Johnson

1992-01-01T23:59:59.000Z

259

DURABILITY TESTING OF FLUIDIZED BED STEAM REFORMER (FBSR) WASTE FORMS  

SciTech Connect (OSTI)

Fluidized Bed Steam Reforming (FBSR) is being considered as a potential technology for the immobilization of a wide variety of high sodium aqueous radioactive wastes. The addition of clay and a catalyst as co-reactants converts high sodium aqueous low activity wastes (LAW) such as those existing at the Hanford and Idaho DOE sites to a granular ''mineralized'' waste form that may be made into a monolith form if necessary. Simulant Hanford and Idaho high sodium wastes were processed in a pilot scale FBSR at Science Applications International Corporation (SAIC) Science and Technology Applications Research (STAR) facility in Idaho Falls, ID. Granular mineral waste forms were made from (1) a basic Hanford Envelope A low-activity waste (LAW) simulant and (2) an acidic INL simulant commonly referred to as sodium-bearing waste (SBW). The FBSR waste forms were characterized and the durability tested via ASTM C1285 (Product Consistency Test), the Environmental Protection Agency (EPA) Toxic Characteristic Leaching Procedure (TCLP), and the Single Pass Flow Through (SPFT) test. The durability of the FBSR waste form products was tested in order to compare the measured durability to previous FBSR waste form testing on Hanford Envelope C waste forms that were made by THOR Treatment Technologies (TTT) and to compare the FBSR durability to vitreous LAW waste forms, specifically the Hanford low activity waste (LAW) glass known as the Low-activity Reference Material (LRM). The durability of the FBSR waste form is comparable to that of the LRM glass for the test responses studied.

Jantzen, C

2006-01-06T23:59:59.000Z

260

Fluidized bed combustor and coal gun-tube assembly therefor  

DOE Patents [OSTI]

A coal supply gun assembly for a fluidized bed combustor which includes heat exchange elements extending above the bed's distributor plate assembly and in which the gun's nozzles are disposed relative to the heat exchange elements to only discharge granular coal material between adjacent heat exchange elements and in a path which is substantially equidistant from adjacent heat exchange elements.

Hosek, William S. (Mt. Tabor, NJ); Garruto, Edward J. (Wayne, NJ)

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Theory of free surface flow over rough seeping beds  

Science Journals Connector (OSTI)

...horizontal bed is assumed to be rough consisting of sediment...the other hand, in the rough flow regime (Re *70...the introduction, the set of equations (3.2...turbulent flow over a rough planar sand bed. The...The flow conditions were set in such a way that sediment...

2007-01-01T23:59:59.000Z

262

Trickle - Bed reactor simulation using a process simulator  

Science Journals Connector (OSTI)

The present study deals with a multiple reaction system in both gas and liquid phases considering the effect of gas-liquid mass transfer limitations in a trickle-bed reactor where the catalytic hydrotreating of gas oil reaction is being carried out. ... Keywords: Trickle - bed reactor, hydrogenation, reactor model, user-added unit operation

E. Verruschi; J. Freitez; Y. Gonzalez; C. G. Dassori

2009-12-01T23:59:59.000Z

263

E-Print Network 3.0 - architecture test bed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test bed Search Powered by Explorit Topic List Advanced Search Sample search results for: architecture test bed Page: << < 1 2 3 4 5 > >> 1 Web-Based Test Bed for Fingerprint Image...

264

Development of Catalytic Tar Decomposition in an Internally Circulating Fluidized-Bed Gasifier  

Science Journals Connector (OSTI)

Biomass gasification in an Internally Circulating Fluidized-bed Gasifier (ICFG) using Ni/Ah03 as tar ... as catalyst in a lab-scale fluidized bed gasifier with catalyst fixed bed. The new catalyst...

Xianbin Xiao; Due Dung Le; Kayoko Morishita…

2010-01-01T23:59:59.000Z

265

Two stage, low temperature, catalyzed fluidized bed incineration with in situ neutralization for radioactive mixed wastes  

SciTech Connect (OSTI)

A two stage, low temperature, catalyzed fluidized bed incineration process is proving successful at incinerating hazardous wastes containing nuclear material. The process operates at 550{degrees}C and 650{degrees}C in its two stages. Acid gas neutralization takes place in situ using sodium carbonate as a sorbent in the first stage bed. The feed material to the incinerator is hazardous waste-as defined by the Resource Conservation and Recovery Act-mixed with radioactive materials. The radioactive materials are plutonium, uranium, and americium that are byproducts of nuclear weapons production. Despite its low temperature operation, this system successfully destroyed poly-chlorinated biphenyls at a 99.99992% destruction and removal efficiency. Radionuclides and volatile heavy metals leave the fluidized beds and enter the air pollution control system in minimal amounts. Recently collected modeling and experimental data show the process minimizes dioxin and furan production. The report also discusses air pollution, ash solidification, and other data collected from pilot- and demonstration-scale testing. The testing took place at Rocky Flats Environmental Technology Site, a US Department of Energy facility, in the 1970s, 1980s, and 1990s.

Wade, J.F.; Williams, P.M.

1995-05-17T23:59:59.000Z

266

Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR)  

Broader source: Energy.gov (indexed) [DOE]

Maturation Plan (TMP) Fluidized Bed Steam Reforming Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) This assessment determines the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's SRS - specifically Fluidized Bed Steam Reformer System. Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) More Documents & Publications Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology for Tank 48H Treatment Project (TTP) SRS Tank 48H Waste Treatment Project Technology Readiness Assessment

267

Methods of forming a fluidized bed of circulating particles  

DOE Patents [OSTI]

There is disclosed an apparatus for forming a fluidized bed of circulating particles. In an embodiment, the apparatus includes a bottom portion having a sidewall, the sidewall defining a curvilinear profile, and the bottom portion configured to contain a bed of particles; and a gas inlet configured to produce a column of gas to carry entrained particles therein. There is disclosed a method of forming a fluidized bed of circulating particles. In an embodiment, the method includes positioning particles within a bottom portion having a sidewall, the sidewall defining a curvilinear profile; producing a column of gas directed upwardly through a gas inlet; carrying entrained particles in the column of gas to produce a fountain of particles over the fluidized bed of circulating particles and subside in the particle bed until being directed inwardly into the column of gas within the curvilinear profile.

Marshall, Douglas W. (Blackfoot, ID)

2011-05-24T23:59:59.000Z

268

Settlement of footing on compacted ash bed  

SciTech Connect (OSTI)

Compacted coal ash fills exhibit capillary stress due to contact moisture and preconsolidation stress due to the compaction process. As such, the conventional methods of estimating settlement of footing on cohesionless soils based on penetration tests become inapplicable in the case of footings on coal ash fills, although coal ash is also a cohesionless material. Therefore, a method of estimating load-settlement behavior of footings resting on coal ash fills accounting for the effect of capillary and preconsolidation stresses is presented here. The proposed method has been validated by conducting plate load tests on laboratory prepared compacted ash beds and comparing the observed and predicted load-settlement behavior. Overestimation of settlement greater than 100% occurs when capillary and preconsolidation stresses are not accounted for, as is the case in conventional methods.

Ramasamy, G.; Pusadkar, S.S. [IIT Roorkee, Roorkee (India). Dept. of Civil Engineering

2007-11-15T23:59:59.000Z

269

Ground-source Heat Pumps Applied to Commercial Buildings  

SciTech Connect (OSTI)

Ground-source heat pumps can provide an energy-efficient, cost-effective way to heat and cool commercial facilities. While ground-source heat pumps are well established in the residential sector, their application in larger, commercial-style, facilities is lagging, in part because of a lack of experience with the technology by those in decision-making positions. Through the use of a ground-coupling system, a conventional water-source heat pump design is transformed to a unique means of utilizing thermodynamic properties of earth and groundwater for efficient operation throughout the year in most climates. In essence, the ground (or groundwater) serves as a heat source during winter operation and a heat sink for summer cooling. Many varieties in design are available, so the technology can be adapted to almost any site. Ground-source heat pump systems can be used widely in commercial-building applications and, with proper installation, offer great potential for the commercial sector, where increased efficiency and reduced heating and cooling costs are important. Ground-source heat pump systems require less refrigerant than conventional air-source heat pumps or air-conditioning systems, with the exception of direct-expansion-type ground-source heat pump systems. This chapter provides information and procedures that an energy manager can use to evaluate most ground-source heat pump applications. Ground-source heat pump operation, system types, design variations, energy savings, and other benefits are explained. Guidelines are provided for appropriate application and installation. Two case studies are presented to give the reader a sense of the actual costs and energy savings. A list of manufacturers and references for further reading are included for prospective users who have specific or highly technical questions not fully addressed in this chapter. Sample case spreadsheets are provided in Appendix A. Additional appendixes provide other information on the ground-source heat pump technology.

Parker, Steven A.; Hadley, Donald L.

2009-07-14T23:59:59.000Z

270

Ground-Source Heat Pumps Applied to Commercial Buildings  

SciTech Connect (OSTI)

Ground-source heat pumps can provide an energy-efficient, cost-effective way to heat and cool commercial facilities. While ground-source heat pumps are well established in the residential sector, their application in larger, commercial-style, facilities is lagging, in part because of a lack of experience with the technology by those in decision-making positions. Through the use of a ground-coupling system, a conventional water-source heat pump design is transformed to a unique means of utilizing thermodynamic properties of earth and groundwater for efficient operation throughout the year in most climates. In essence, the ground (or groundwater) serves as a heat source during winter operation and a heat sink for summer cooling. Many varieties in design are available, so the technology can be adapted to almost any site. Ground-source heat pump systems can be used widely in commercial-building applications and, with proper installation, offer great potential for the commercial sector, where increased efficiency and reduced heating and cooling costs are important. Ground-source heat pump systems require less refrigerant than conventional air-source heat pumps or air-conditioning systems, with the exception of direct-expansion-type ground-source heat pump systems. This chapter provides information and procedures that an energy manager can use to evaluate most ground-source heat pump applications. Ground-source heat pump operation, system types, design variations, energy savings, and other benefits are explained. Guidelines are provided for appropriate application and installation. Two case studies are presented to give the reader a sense of the actual costs and energy savings. A list of manufacturers and references for further reading are included for prospective users who have specific or highly technical questions not fully addressed in this chapter. Sample case spreadsheets are provided in Appendix A. Additional appendixes provide other information on the ground-source heat pump technology.

Parker, Steven A.; Hadley, Donald L.

2006-12-31T23:59:59.000Z

271

Cleanup Verification Package for the 118-F-6 Burial Ground  

SciTech Connect (OSTI)

This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

H. M. Sulloway

2008-10-02T23:59:59.000Z

272

Ground magnetic survey in the Coso Range, California | Open Energy  

Open Energy Info (EERE)

Ground magnetic survey in the Coso Range, California Ground magnetic survey in the Coso Range, California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Ground magnetic survey in the Coso Range, California Details Activities (1) Areas (1) Regions (0) Abstract: A ground magnetic study was completed in the Coso volcanic field to investigate faulting and associated hydrothermal alteration patterns. The magnetic intensity contours match general geologic patterns in varying rock types. Hydrothermally altered rocks along intersecting fault zones show up as strong magnetic lows that form a triangular-shaped area. This area is centered in an area of highest heat flow and is a site of concentrated fumarolic activity. In the Coso volcanic field the combination of high heat flow, fumarolic activity, magnetic lows, and hydrothermal

273

Digging Begins at Hazardous Hanford Burial Ground - River Corridor  

Broader source: Energy.gov (indexed) [DOE]

Digging Begins at Hazardous Hanford Burial Ground - River Corridor Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 August 3, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 Todd Nelson, Washington Closure media@wch-rcc.com 509-372-9097 RICHLAND, WASH. - After careful preparation and characterization, the Department of Energy's (DOE) River Corridor contractor, Washington Closure Hanford, has begun remediation of one of the most hazardous burial grounds tackled to date on the Hanford Site's River Corridor. The $57 million American Recovery and Reinvestment Act project began with nearly two years of preparation and characterization before reaching their

274

Factorial tests on process operating conditions and bed fines on the circulating fluid bed performance  

SciTech Connect (OSTI)

A cold-flow circulating fluid bed (CFB) was operated using coke breeze with a packed-bed standpipe over a range of riser and standpipe air flows. The bed materials were selected to simulate solids flow in a CFB gasifier (carbonizer) but are generally relevant to most CFB processes. CFB tests were conducted primarily in the transport mode with sufficient gas velocity to achieve a uniform axial riser pressure profiles over most of the riser height. The independent variables tested included the riser gas velocity, aeration at the base of the standpipe, and concentration of fines (average particle size). The solids inventory and riser outlet pressure were maintained constant. Factorial tests were conducted in randomized order and in duplicate to provide and an unbiased estimate of the error. Fines were tested as a blocked variable. The gas velocity, standpipe aeration, and relative amount of fine particles were all found to be significant factors affecting both the riser solids holdup and solids flux. The riser pressure drop and mass circulation increased at the higher level of fines contrary to some earlier reports in the literature. The riser pressure drop was fitted using the general linear model (GLM), which explained more than 98% of the variation within the data, while a GLM for the mass circulation rate explained over 90%. The uncertainty of process operating variables was characterized independently through a series of duplicated flow proving experiments.

Shadle, L.J.; Spenik, James; Sarra, Angela; Ontko, J.S.

2004-07-21T23:59:59.000Z

275

Bed material agglomeration during fluidized bed combustion. Technical progress report, October 1, 1993--December 31, 1993  

SciTech Connect (OSTI)

During this quarter, agglomerates which formed in the FBC at Montana-Dakota Utilities (Heskett Station Unit 2 located in Bismarck, ND) were analyzed by x-ray diffraction analyses (XRD) for mineral determination; bulk chemical composition was determined by inductively coupled plasma spectroscopy; and polished sections were made for optical and scanning electron microscopy. Polarized-light microscopy was performed using a Zeiss research microscope. Individual mineral grains were analyzed using an ARL electron microprobe and a JOEL 840 scanning electron microscope. The agglomerate was found in the mechanical dust collector and was about ten centimeters in diameter with a dark-colored core and a greenish rim. The sample had voids up to ten millimeters in size; however, the agglomerate was hard to break apart. Bulk compositionally, the agglomerate consists primarily of calcium, silica, and alumina with relatively high abundances of iron (8 to 9 wt %), magnesium (5 to 9 wt %) and sodium (3 to 4 wt %). It is likely that the ``root`` cause of this agglomerate originated in the dense phase of the FBC bed. Because fluidized bed combustors work below the ash fusion temperature of coal ash, aluminosilicates (clays) in the ash probably became ``sticky`` due to fluxing reactions with pyrite (FeS{sub 2}) and perhaps alkalies (Na). This is indicated by the high amounts of iron, silica, and alumina in the agglomerate. Because of the size of the deposit, the bed particles probably agglomerated in the dust collector.

Brown, R.C.; Dawson, M.R.; Smeenk, J.L.

1994-01-01T23:59:59.000Z

276

E-Print Network 3.0 - abundance bed net Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

s00723-007-0002-7 Summary: Applied Magnetic Resonance Noninvasive Measurements of Gas Exchange in a Three- Dimensional Fluidized Bed... -fluidized bed of solid par- ticles....

277

E-Print Network 3.0 - agitated fluidized bed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

testing of manure digestion system has been initiated. The new TAMU fluidized bed gasifier... of the fluidized bed gasifier. Activity this quarter: a. The assembly of the new...

278

E-Print Network 3.0 - agitation fluidized bed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

testing of manure digestion system has been initiated. The new TAMU fluidized bed gasifier... of the fluidized bed gasifier. Activity this quarter: a. The assembly of the new...

279

E-Print Network 3.0 - assessing bed net Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for: assessing bed net Page: << < 1 2 3 4 5 > >> 1 Modeling decadal bed material sediment flux based on stochastic Michael Bliss Singer and Thomas Dunne Summary: ; published...

280

E-Print Network 3.0 - annual fluidized bed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Minnesota Collection: Engineering 16 POTENTIAL ADVANTAGES OF INCINERATION IN FLUIDIZED BEDS Summary: POTENTIAL ADVANTAGES OF INCINERATION IN FLUIDIZED BEDS...

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Benchmark problems for repository siting models  

SciTech Connect (OSTI)

This report describes benchmark problems to test computer codes used in siting nuclear waste repositories. Analytical solutions, field problems, and hypothetical problems are included. Problems are included for the following types of codes: ground-water flow in saturated porous media, heat transport in saturated media, ground-water flow in saturated fractured media, heat and solute transport in saturated porous media, solute transport in saturated porous media, solute transport in saturated fractured media, and solute transport in unsaturated porous media.

Ross, B.; Mercer, J.W.; Thomas, S.D.; Lester, B.H.

1982-12-01T23:59:59.000Z

282

Atmospheric considerations for the CTA site search  

E-Print Network [OSTI]

The Cherenkov Telescope Array (CTA) will be the next high-energy gamma-ray observatory. Selection of the sites, one in each hemisphere, is not obvious since several factors have to be taken into account. Among them, and probably the most crucial, are the atmospheric conditions. Since July 2012, the site working group has deployed automatic ground based instrumentation (ATMOSCOPE) on all the candidate sites. Due to the limited time span available from ground based data, long term weather forecast models become necessary tools for site characterization. It is then of prime importance to validate the models by comparing it to the ATMOSCOPE measurements. We will describe the sources of data (ATMOSCOPE, weather forecasting model and satellite data) for the site evaluation and how they will be used and combined.

Vincent, Stephane

2014-01-01T23:59:59.000Z

283

CARBON BED MERCURY EMISSIONS CONTROL FOR MIXED WASTE TREATMENT  

SciTech Connect (OSTI)

Mercury has had various uses in nuclear fuel reprocessing and other nuclear processes, and so is often present in radioactive and mixed (both radioactive and hazardous according tohe Resource Conservation and Recovery Act) wastes. Depending on regulatory requirements, the mercury in the off-gas must be controlled with sometimes very high efficiencies. Compliance to the Hazardous Waste Combustor (HWC) Maximum Achievable Control Technology (MACT) standards can require off-gas mercury removal efficiencies up to 99.999% for thermally treating some mixed waste streams. Several test programs have demonstrated this level of off-gas mercury control using fixed beds of granular sulfur-impregnated activated carbon. Other results of these tests include: (a) The depth of the mercury control mass transfer zone was less than 15-30 cm for the operating conditions of these tests, (b) MERSORB® carbon can sorb Hg up to 19 wt% of the carbon mass, and (c) the spent carbon retained almost all (98 – 99.99%) of the Hg; but when even a small fraction of the total Hg dissolves, the spent carbon can fail the TCLP test when the spent carbon contains high Hg concentrations. Localized areas in a carbon bed that become heated through heat of adsorption, to temperatures where oxidation occurs, are referred to as “bed hot spots.” Carbon bed hot spots must be avoided in processes that treat radioactive and mixed waste. Key to carbon bed hot spot mitigation are (a) designing for sufficient gas velocity, for avoiding gas flow maldistribution, and for sufficient but not excessive bed depth, (b) monitoring and control of inlet gas flowrate, temperature, and composition, (c) monitoring and control of in-bed and bed outlet gas temperatures, and (d) most important, monitoring of bed outlet CO concentrations. An increase of CO levels in the off-gas downstream of the carbon bed to levels about 50-100 ppm higher than the inlet CO concentration indicate CO formation in the bed, caused by carbon bed hot spots. Corrective actions must be implemented quickly if bed hot spots are detected, using a graded approach and sequence starting with corrective actions that are simple, quick, cause the least impact to the process, and are easiest to recover from. Multiple high and high-high alarm levels should be used, with appropriate corrective actions for each level.

Nick Soelberg; Joe Enneking

2010-11-01T23:59:59.000Z

284

1999 SITE ENVIRONMENTAL REPORT  

SciTech Connect (OSTI)

Throughout the scientific community, Brookhaven National Laboratory (BNL) is renowned for its leading-edge research in physics, medicine, chemistry, biology, materials, and the environment. BNL is committed to supporting its world-class scientific research with an internationally recognized environmental protection program. The 1999 Site Environmental Report (SER) summarizes the status of the Laboratory's environmental programs and performance, including the steady progress towards cleaning up the site and fully integrating environmental stewardship into all facets of the Laboratory's mission. BNL is located on 5,265 acres of pine barrens in Suffolk County in the center of Long Island, New York. The Laboratory is situated above a sole source aquifer at the headwaters of the Peconic River; therefore, protecting ground and surface water quality is a special concern. Approximately 3,600 acres of the site are undeveloped and serve as habitat for a wide variety of animals and plants, including one New York State endangered species, the tiger salamander, and two New York State threatened species, the banded sunfish and the stiff goldenrod. Monitoring, preserving, and restoring these ecological resources is a high priority for the Laboratory.

ENGEL-COX,J.; ZIMMERMAN,E.; LEE,R.; WILLIAMS,J.; GREEN,T.; PAQUETTE,D.; HOODA,B.; SCARPITTA,S.; GENZER,P.; ET AL

2000-09-01T23:59:59.000Z

285

EPA Final Ground Water Rule  

Broader source: Energy.gov (indexed) [DOE]

Office of Nuclear Safety and Environment Office of Nuclear Safety and Environment Nuclear Safety and Environment Information Brief HS-20-IB-2007-02 (March 2007) EPA Final Ground Water Rule Safe Drinking Water Act: National Primary Drinking Water Regulations Ground Water Rule - 40 CFR Parts 9, 141 and 142 Final Rule: 71 FR 65574 Effective Date: January 8, 2007 1 RULE SYNOPSIS On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in public water systems (PWSs) that use ground water sources for their supply (these systems are known as ground water systems). This Rule establishes a risk-targeted approach

286

On LHCb muon MWPC grounding  

E-Print Network [OSTI]

My goal is to study how a big MWPC system, in particular the LHCb muon system, can be protected against unstable operation and multiple spurious hits, produced by incorrect or imperfect grounding in the severe EM environment of the LHCb experiment. A mechanism of penetration of parasitic current from the ground loop to the input of the front-end amplifier is discussed. A new model of the detector cell as the electrical bridge is considered. As shown, unbalance of the bridge makes detector to be sensitive to the noise in ground loop. Resonances in ground loop are specified. Tests of multiple-point and single-point grounding conceptions made on mock-up are presented.

Kashchuk, A

2006-01-01T23:59:59.000Z

287

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report  

SciTech Connect (OSTI)

This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports.

NONE

1995-09-01T23:59:59.000Z

288

Regional analysis of ground and above-ground climate  

SciTech Connect (OSTI)

The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

Not Available

1981-12-01T23:59:59.000Z

289

Moving granular-bed filter development program. Topical report  

SciTech Connect (OSTI)

Advanced, coal-based, power plants, such as IGCC and Advanced-PFBC, are currently nearing commercial demonstration. These power plant technologies require hot gas filtration as part of their gas cleaning trains. Ceramic barrier filters are the major filter candidates being developed for these hot gas cleaning applications. While ceramic barrier filters achieve high levels of particle removal, concerns exist for their reliability and operability in these applications. An alternative hot gas filtration technology is the moving granular bed filter. An advanced, moving granular bed filter has been conceived, and early development activities performed by the Westinghouse Electric Corporation, Science and Technology Center. This document reports on the Base Contract tasks performed to resolve the barrier technical issues for this technology. The concept, the Standleg Moving Granular Bed Filter (SMGBF) has a concurrent downward, gas and bed media flow configuration that results in simplified features and improved scaleup feasibility compared to alternative designs. Two modes of bed media operation were assessed in the program: once-through using pelletized power plant waste as bed media, and recycle of bed media via standleg and pneumatic transport techniques. Cold Model testing; high-temperature, high-pressure testing; and pelletization testing using advanced power plant wastes, have been conducted in the program. A commercial, economic assessment of the SMGBF technology was performed for IGCC and Advanced-PFBC applications. The evaluation shows that the barrier technical issues can be resolved, and that the technology is potentially competitive with ceramic barrier filters.

Newby, R.A.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1994-04-01T23:59:59.000Z

290

Photo Gallery - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Road Construction near Burial Ground Road Construction near Burial Ground B Reactor Construction B Reactor Construction Installing Sludge Containers Installing Sludge Containers...

291

UC Berkeley Seismic Guidelines, Appendix II: Ground Motion Time Histories for the UC Berkeley Campus  

E-Print Network [OSTI]

U.C. BERKELEY SEISMIC GUIDELINES APPENDIX II GROUND MOTIONthe deaggregation of the seismic hazard. These values at aK-net site whose soil and seismic wave velocity profiles are

Authors, Various

2010-01-01T23:59:59.000Z

292

GROUND VIBRATION AND COHERENCE LENGTH MEASUREMENTS FOR THE CLIC NANO-STABILIZATION STUDIES  

E-Print Network [OSTI]

GROUND VIBRATION AND COHERENCE LENGTH MEASUREMENTS FOR THE CLIC NANO-STABILIZATION STUDIES K requirements. For more than two decades, ground vibration measurements were made by different teams and at different CERN sites on the surface. The devices to measure nanometre sized vibrations, the analysis

Boyer, Edmond

293

Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground  

SciTech Connect (OSTI)

This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes.

M. J. Appel and J. M. Capron

2007-07-25T23:59:59.000Z

294

E-Print Network 3.0 - abandoned sites Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Missouri," Missouri Summary: of Pennsylvanian sinkholes.) 2. The abandoned and in-filled open pit mines represent sites of potential gradual... for abandoned mined ground as a...

295

Analysis of major risks associated with hydrocarbon storage caverns in bedded salt rock  

Science Journals Connector (OSTI)

Salt rock is internationally accepted as an ideal medium for energy storage. As an energy storage structure, the safety of hydrocarbon storage caverns in salt rock is related to the national economy and to social public security. Risk analysis is an important method of engineering safety evaluation. In this paper the major risks associated with hydrocarbon storage caverns in bedded salt rock are defined. The major risks are classified under the headings of ‘oil and gas leakage’, ‘ground subsidence’, and ‘cavern failure’, and are discussed under these topical titles. The factors leading to the major risks associated with storage caverns are identified by reviewing descriptions of major accidents of salt storage caverns around the world. Fault tree models for the three major risks are established and analyzed. Basic paths of the risk and their occurrence probability ranking are derived. The risk factors which contribute greatly to the risk are identified by calculating the importance degree of all the basic events. Finally, a comprehensive evaluation methodology for major risk loss is generated based on the analytic hierarchy process. This provides a theoretical foundation for the evaluation and prevention of major risks in the construction and operation of storage caverns in bedded salt rock.

Chunhe Yang; Wenjun Jing; J.J.K. Daemen; Guimin Zhang; Chao Du

2013-01-01T23:59:59.000Z

296

NLS ground states on graphs  

E-Print Network [OSTI]

We investigate the existence of ground states for the subcritical NLS energy on metric graphs. In particular, we find out a topological assumption that guarantees the nonexistence of ground states, and give an example in which the assumption is not fulfilled and ground states actually exist. In order to obtain the result, we introduce a new rearrangement technique, adapted to the graph where it applies. Owing to such a technique, the energy level of the rearranged function is improved by conveniently mixing the symmetric and monotone rearrangement procedures.

Riccardo Adami; Enrico Serra; Paolo Tilli

2014-06-16T23:59:59.000Z

297

Site C  

Office of Legacy Management (LM)

' ' u. s. A r my Corps or Engineers Kurfal.. Ilisfr ifl om« 1776 N1 . ~lI rll Sfred , lIu fflll" , New v ur k. 14207 Site C loseout Report for th e Ashland I (Includlng Seaway Arca D), Ashland 2 and Rattlesnake Creek FUS RAP Sites To nawanda . New Yor k F ina l - Octo ber 2006 Formerl y Ut ilized Sites Remedi al Actiun Program Dt:CLAlUlfiO lO OF RF ~ I'O""" A <:n o .. ('oMnLflOI'O '" 1 S-~1 1 A "n· nvnn: S Ill: C'lO'iU 'U l RtrUlIT f OR A SlIu x u l (I "ICLU I ING S t:A" ·,H A RU D j, AS H I .A ~O 2 A."n RAnU:M'AKf eRU" ~ rn~ I!d'on at A.hland 1 (Ind udonl Seaway Area DJ. Ashland 2 and kan~snak c Creek is Wi,...... 1c in acwr.hnu willi ~ Rcconl or Oecisim (ROD) . igned 00> April 20. 1998 and l'.1pbIWlOII <;If

298

ADVANCED SORBENT DEVELOPMENT PROGRAM DEVELOPMENT OF SORBENTS FOR MOVING-BED AND FLUIDIZED-BED APPLICATIONS  

SciTech Connect (OSTI)

The integrated gasification combined cycle (IGCC) power system using high-temperature coal gas cleanup is one of the most promising advanced technologies for the production of electric power from coal in an environmentally acceptable manner. Unlike conventional low-temperature cleanup systems that require costly heat exchangers, high-temperature coal gas cleanup systems can be operated near 482-538 C (900-1000 F) or higher, conditions that are a closer match with the gasifier and turbine components in the IGCC system, thus resulting is a more efficient overall system. GE is developing a moving-bed, high-temperature desulfurization system for the IGCC power cycle in which zinc-based regenerable sorbents are currently being used as desulfurization sorbents. Zinc titanate and other proprietary zinc-based oxides are being considered as sorbents for use in the Clean Coal Technology Demonstration Program at Tampa Electric Co.'s (TECo) Polk Power Station. Under cold startup conditions at TECo, desulfurization and regeneration may be carried out at temperatures as low as 343 C (650 F), hence a versatile sorbent is desirable to perform over this wide temperature range. A key to success in the development of high-temperature desulfurization systems is the matching of sorbent properties for the selected process operating conditions, namely, sustainable desulfurization kinetics, high sulfur capacity, and mechanical durability over multiple cycles. Additionally, the sulfur species produced during regeneration of the sorbent must be in a form compatible with sulfur recovery systems, such as sulfuric acid or elemental sulfur processes. The overall objective of this program is to develop regenerable sorbents for hydrogen sulfide removal from coal-derived fuel gases in the temperature range 343-538 C (650-1000 F). Two categories of reactor configurations are being considered: moving-bed reactors and fluidized-bed (bubbling and circulating) reactors. In addition, a cost assessment and a market plan for large-scale fabrication of sorbents were developed. As an optional task, long-term bench-scale tests of the best moving-bed sorbents were conducted. Starting from thermodynamic calculations, several metal oxides were identified for potential use as hot gas cleanup sorbents using constructed phase stability diagrams and laboratory screening of various mixed-metal oxide formulations. Modified zinc titanates and other proprietary metal oxide formulations were evaluated at the bench scale and many of them found to be acceptable for operation in the target desulfurization temperature range of 370 C (700 F) to 538 C (1000 F) and regeneration temperatures up to 760 C (1400 F). Further work is still needed to reduce the batch-to-batch repeatability in the fabrication of modified zinc titanates for larger scale applications. The information presented in this Volume 1 report contains the results of moving-bed sorbent development at General Electric's Corporate Research and Development (GE-CRD). A separate Volume 2 report contains the results of the subcontract on fluidized-bed sorbent development at the Institute of Gas Technology (IGT).

R.E Ayala; V.S. Venkataramani; Javad Abbasian; Rachid B. Slimane; Brett E. Williams; Minoo K. Zarnegar; James R. Wangerow; Andy H. Hill

2000-03-31T23:59:59.000Z

299

ADVANCED SORBENT DEVELOPMENT PROGRAM; DEVELOPMENT OF SORBENTS FOR MOVING-BED AND FLUIDIZED-BED APPLICATIONS  

SciTech Connect (OSTI)

The integrated gasification combined cycle (IGCC) power system using high-temperature coal gas cleanup is one of the most promising advanced technologies for the production of electric power from coal in an environmentally acceptable manner. Unlike conventional low-temperature cleanup systems that require costly heat exchangers, high-temperature coal gas cleanup systems can be operated near 482-538 °C (900-1000 °F) or higher, conditions that are a closer match with the gasifier and turbine components in the IGCC system, thus resulting is a more efficient overall system. GE is developing a moving-bed, high-temperature desulfurization system for the IGCC power cycle in which zinc-based regenerable sorbents are currently being used as desulfurization sorbents. Zinc titanate and other proprietary zinc-based oxides are being considered as sorbents for use in the Clean Coal Technology Demonstration Program at Tampa Electric Co.?s (TECo) Polk Power Station. Under cold startup conditions at TECo, desulfurization and regeneration may be carried out at temperatures as low as 343 °C (650 °F), hence a versatile sorbent is desirable to perform over this wide temperature range. A key to success in the development of high-temperature desulfurization systems is the matching of sorbent properties for the selected process operating conditions, namely, sustainable desulfurization kinetics, high sulfur capacity, and mechanical durability over multiple cycles. Additionally, the sulfur species produced during regeneration of the sorbent must be in a form compatible with sulfur recovery systems, such as sulfuric acid or elemental sulfur processes. The overall objective of this program is to develop regenerable sorbents for hydrogen sulfide removal from coal-derived fuel gases in the temperature range 343-538 °C (650-1000 °F). Two categories of reactor configurations are being considered: moving-bed reactors and fluidized-bed (bubbling and circulating) reactors. In addition, a cost assessment and a market plan for large-scale fabrication of sorbents were developed. As an optional task, long-term bench-scale tests of the best moving-bed sorbents were conducted. Starting from thermodynamic calculations, several metal oxides were identified for potential use as hot gas cleanup sorbents using constructed phase stability diagrams and laboratory screening of various mixed-metal oxide formulations. Modified zinc titanates and other proprietary metal oxide formulations were evaluated at the bench scale and many of them found to be acceptable for operation in the target desulfurization temperature range of 370 °C (700 °F) to 538 °C (1000 °F) and regeneration tempera-tures up to 760 °C (1400 °F). Further work is still needed to reduce the batch-to-batch repeatability in the fabrication of modified zinc titanates for larger scale applications. The information presented in this Volume 1 report contains the results of moving-bed sorbent develop-ment at General Electric?s Corporate Research and Development (GE-CRD). A separate Volume 2 report contains the results of the subcontract on fluidized-bed sorbent development at the Institute of Gas Technology (IGT).

R.E. AYALA; V.S. VENKATARAMANI

1998-09-30T23:59:59.000Z

300

Apparatus for fixed bed coal gasification  

DOE Patents [OSTI]

An apparatus for fixed-bed coal gasification is described in which coal such as caking coal is continuously pyrolyzed with clump formation inhibited, by combining the coal with a combustible gas and an oxidant, and then continually feeding the pyrolyzed coal under pressure and elevated temperature into the gasification region of a pressure vessel. The materials in the pressure vessel are allowed to react with the gasifying agents in order to allow the carbon contents of the pyrolyzed coal to be completely oxidized. The combustion of gas produced from the combination of coal pyrolysis and gasification involves combining a combustible gas coal and an oxidant in a pyrolysis chamber and heating the components to a temperature of at least 1600.degree. F. The products of coal pyrolysis are dispersed from the pyrolyzer directly into the high temperature gasification region of a pressure vessel. Steam and air needed for gasification are introduced in the pressure vessel and the materials exiting the pyrolyzer flow down through the pressure vessel by gravity with sufficient residence time to allow any carbon to form carbon monoxide. Gas produced from these reactions are then released from the pressure vessel and ash is disposed of.

Sadowski, Richard S. (Greenville, SC)

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Fluidized bed pyrolysis of terrestrial biomass feedstocks  

SciTech Connect (OSTI)

Hybrid poplar, switchgrass, and corn stover were pyrolyzed in a bench scale fluidized-bed reactor to examine the influence of storage time on thermochemical converting of these materials. The influence of storage on the thermochemical conversion of the biomass feedstocks was assessed based on pyrolysis product yields and chemical and instrumental analyses of the pyrolysis products. Although char and gas yields from corn stover feedstock were influenced by storage time, hybrid poplar and switchgrass were not significantly affected. Liquid, char, and gas yields were feedstock dependent. Total liquid yields (organic+water) varied from 58%-73% depending on the feedstock. Char yields varied from 14%-19% while gas yields ranged from 11%-15%. The chemical composition of the pyrolysis oils from hybrid polar feedstock was slightly changed by storage, however, corn stover and switchgrass feedstock showed no significant changes. Additionally, stored corn stover and hybrid poplar pyrolysis oils showed a significant decrease in their higher heating values compared to the fresh material.

Besler, S.; Agblevor, F.A.; Davis, M.F. [National Renewable Energy Lab., Golden, CO (United States)] [and others

1994-12-31T23:59:59.000Z

302

The fluid bed market: Status, trends, & outlook  

SciTech Connect (OSTI)

Fluidized bed combustion (FBC) technology has become a major commercial competitor for conventional solid fuel combustion systems. Since the mid-1980s, independent power producers (IPPs) and cogenerators in particular, pursuing opportunities created by PURPA, have led the way in deploying FBC boilers for electric power and cogeneration plants in the United States. Circulating FBC (CFBC) boilers became the predominant FBC choice for coal-, coke-, and coal waste-fired projects with unit capacities typically in the range of 300,000-600,000 lb/hr (35-70 MW (nominal)). Utility-type reheat units in the 115-165 MW (net) range are now in operation in the United States and Europe. A 250 MW CFBC unit is under construction for 1995 startup in France, and another is scheduled for 1998 startup in Pennsylvania. A 350 MW bubbling FBC boiler is being commissioned now in Japan. Several other CFBC projects that would employ 150-250 MW CFBC units are in various stages of planning in the United States, Puerto Rico, Europe, and Asia.

Simbeck, D.R.; Johnson, H.E.; Wilhelm, D.J. [SFA Pacific, Inc., Mountain View, CA (United States)

1994-12-31T23:59:59.000Z

303

Disposing of nuclear waste in a salt bed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disposing of nuclear waste in a salt bed Disposing of nuclear waste in a salt bed 1663 Los Alamos science and technology magazine Latest Issue:November 2013 All Issues » submit Disposing of nuclear waste in a salt bed Decades' worth of transuranic waste from Los Alamos is being laid to rest at the Waste Isolation Pilot Plant in southeastern New Mexico March 25, 2013 Disposing of nuclear waste in a salt bed Depending on the impurities embedded within it, the salt from WIPP can be anything from a reddish, relatively opaque rock to a clear crystal like the one shown here. Ordinary salt effectively seals transuranic waste in a long-term repository Transuranic waste, made of items such as lab coats and equipment that have been contaminated by radioactive elements heavier than uranium, is being shipped from the Los Alamos National Laboratory to a long-term storage

304

Computational Analysis of Fluid Flow in Pebble Bed Modular Reactor  

E-Print Network [OSTI]

High Temperature Gas-cooled Reactor (HTGR) is a Generation IV reactor under consideration by Department of Energy and in the nuclear industry. There are two categories of HTGRs, namely, Pebble Bed Modular Reactor (PBMR) and Prismatic reactor. Pebble...

Gandhir, Akshay

2012-10-19T23:59:59.000Z

305

Initial Design of a Dual Fluidized Bed Reactor  

E-Print Network [OSTI]

from a steam hydro gasification and reforming process.study on biomass Air-steam gasification in a fluidized bed.limestone calcination on the gasification processes in a BFB

Yun, Minyoung

2014-01-01T23:59:59.000Z

306

EEB Hub: A Test Bed for Nationwide Energy Efficiency  

E-Print Network [OSTI]

EEB Hub: A Test Bed for Nationwide Energy Efficiency Wednesday, May 1, 2013 11:00 a.m. - 12:00 p 2011, became the executive director of the Energy Efficient Buildings (EEB) HUB through the US

Hall, Sharon J.

307

Design and Operation of CFB Boilers with Low Bed Inventory  

Science Journals Connector (OSTI)

In this paper, the challenges and problems of the circulating fluidized bed (CFB) combustion technology are summarized and analyzed. In order to resolve the problems in CFB boiler application, design principals a...

Jun Su; Xiaoxing Zhao; Jianchun Zhang…

2010-01-01T23:59:59.000Z

308

Initial Design of a Dual Fluidized Bed Reactor  

E-Print Network [OSTI]

fluidized bed gaisifers (CFB) (Figure 1.6) 1.3.1. Bubblingbed gasifiers (BFB and CFB) have great features for SH.employed for the SHR design. CFB enables a circulation of

Yun, Minyoung

2014-01-01T23:59:59.000Z

309

MCNP4B Modeling of Pebble-Bed Reactors  

E-Print Network [OSTI]

The applicability of the Monte Carlo code MCNP4B to the neutronic modeling of pebble-bed reactors was investigated. A modeling methodology was developed based on an analysis of critical experiments carried out at the ...

Lebenhaft, Julian Robert

2001-10-15T23:59:59.000Z

310

Fluid Beds: At Last, Challenging Two Entrenched Practices  

Science Journals Connector (OSTI)

...FLUIDIZED-BED COMBUSTOR, JOURNAL...FLUIDIZED COAL COMBUSTOR, COMBUSTION...NONCATALYTIC GAS-SOLID REACTIONS...PARTICLES AT HIGH VELOCITIES...SATIJA, S, PRESSURE-FLUCTUATIONS...gasoline has a higher octane number...to convert natural gas to gasoline...

Arthur M. Squires; Mooson Kwauk; Amos A. Avidan

1985-12-20T23:59:59.000Z

311

Electrical capacitance volume tomography (ECVT) applied to bubbling fluid beds  

SciTech Connect (OSTI)

These presentation visuals illustrate the apparatus and method for applying Electrical Capacitance Volume Tomography (ECVT) to bubbling fluid beds to their solid fraction and bubble properties. Results are compared to estimated values.

Weber, J., Mei, J.

2012-01-01T23:59:59.000Z

312

ANALYSIS OF METHANE PRODUCING COMMUNITIES WITHIN UNDERGROUND COAL BEDS  

E-Print Network [OSTI]

ANALYSIS OF METHANE PRODUCING COMMUNITIES WITHIN UNDERGROUND COAL BEDS by Elliott Paul Barnhart ..................................................................................14 Ability of the Consortium to Produce Methane from Coal and Metabolites ................16.............................................................................................21 Coal and Methane Production

Maxwell, Bruce D.

313

Simulation of biomass gasification in a dual fluidized bed gasifier  

Science Journals Connector (OSTI)

Biomass gasification with steam in a dual-fluidized bed gasifier (DFBG) was simulated with ASPEN Plus. ... that the content of char transferred from the gasifier to the combustor decreases from 22.5...2 concentra...

Jie He; Kristina Göransson; Ulf Söderlind…

2012-03-01T23:59:59.000Z

314

Fluidized Bed Technology- An R&D Success Story  

Broader source: Energy.gov [DOE]

In the early 1990s, POWER magazine called the development of fluidized bed coal combustors "the commercial success story of the last decade in the power generation business." The success, perhaps...

315

MODULAR PEBBLE BED REACTOR PROJECT UNIVERSITY RESEARCH CONSORTIUM  

E-Print Network [OSTI]

Annual Report Page ii MODULAR PEBBLE BED REACTOR ABSTRACT This project is developing a fundamental. Publication of an archival journal article covering this work is being prepared. · Detailed gas reactor Abstract

316

Monticello National Priorities List (NPL) Sites  

Office of Legacy Management (LM)

National Priorities List (NPL) Sites National Priorities List (NPL) Sites Federal Facilities Agreement (FFA) Quarterly Report: January 1 -March 31, 2009 Department of Energy Legacy Management (DOE LM) Site Manager: Jalena Dayvault This repott summarizes current project status and activities implemented during January through March 2009, and prqvides a schedule of planned near term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This repmt also includes disposal cell and Pond 4 leachate collection data, quarterly site inspection reports, site meteorological data, and performance summary for the ex situ ground water treatment system. 1.0 MMTS Activities/Status Disposal Cell and Pond 4 . . * Monthly and quarterly inspection of the repository identified no abnormalities (see

317

Calibrating Pesticide Application Ground Equipment  

E-Print Network [OSTI]

This pocket-sized guide gives step-by-step instructions for calibrating ground sprayers. Tables provide instructions, examples and sample formulas for determining speed of application, flow rate and the amount of pesticide to add to the tank....

Shaw, Bryan W.

2000-07-05T23:59:59.000Z

318

Ground Water Management Regulations (Louisiana)  

Broader source: Energy.gov [DOE]

The rules and regulations apply to the management of the state's ground water resources. In addition, the Commissioner of Conservation has recommended that oil and gas operators with an interest...

319

Research paper Early diagenetic carbonate bed formation at the sedimentwater interface triggered  

E-Print Network [OSTI]

, chemical, and C and O stable isotope data allow us to infer that the beds formed during synsedimentary exhibit two or three carbonate beds in the vicinity of Wimereux city (3 beds at Wimereux-North and 2 beds Formation, Wheatleyensis+Pectinatus ammonite zones, see below) represents a low-energy shelf facies

320

EXPERIMENT AND NEURAL NETWORK MODEL OF PRIMARY FRAGMENTATION OF OIL SHALE IN FLUIDIZED BED  

E-Print Network [OSTI]

that the fluidized bed temperature is an important factor of primary fragmentation of oil shale, and

Zhigang Cui; Xiangxin Han; Xiumin Jiang; Jianguo Liu

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The backflow cell model for fluidized bed catalytic reactors  

E-Print Network [OSTI]

that the backmixing of gas in a small fluidized bed with high length to diameter rati. o is relatively small. Hence, it was recommended. that reaction rate studies in fluidized bed reactors be correlated on the basis oi' piston flow~ neglecting mixing. Nay (19...) points out that the straight line obtained on plotting the results of Gilliland's ex- periment on a paper with semilogarithmic coordinates, can be used to characterize the residence time distribution introduced by Danckwerts (6). A steep slope, he...

Ganapathy, E. V

2012-06-07T23:59:59.000Z

322

Performance characterization of a packed bed electro-filter  

E-Print Network [OSTI]

PERFORMANCE CHARACTERIZATION OF A PACKED BED ELECTRO-FILTER A Thesis by A JAY NARAYANAN Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1990 Major Subject: Safety Engineering PERFORMANCE CHARACTERIZATION OF A PACKED BED ELECTRO-FILTER A Thesis by AJAY NARAYANAN Approved as to style and content by: John P. Wagn (Ch ' of the Com ittee) Aydin Akgerman (Member) Ri ard B...

Narayanan, Ajay

2012-06-07T23:59:59.000Z

323

Kinetic parameter estimation using nonisothermal trickle-bed reactor data  

E-Print Network [OSTI]

KINETIC PARAMETER ESTIMATION USING NONISOTHERMAL TRICKLE-BED REACTOR DATA A Thesis by MICHAEL ALLEN MENSIK Submitted to the Graduate College of Texas ALM University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE May 1985 Major Subject: Chemical Engineering KINETIC PARAMETER ESTIMATION USING NONISOTHERMAL TRICKLE-BED REACTOR DATA A Thesis by MICHAEL ALLEN MENSIK Approved as to style and content by: A. ger n (Chairman of Comm ee) R. G. Antho...

Mensik, Michael Allen

2012-06-07T23:59:59.000Z

324

Fluidized-bed retrofit a practical alternative to FGD  

SciTech Connect (OSTI)

A comparison is made between the costs of flue-gas desulphurization retrofit to a 112 MW pf-fired boiler, fluidized-bed combustion retrofit to the boiler, and a new fluidized-bed boiler. Breakdowns are given for capital costs, operating and maintenance costs and the busbar cost of energy for a 20 year unit life. The analysis shows that fbc is a viable option for the retrofit of many existing boilers from both a technical and economic viewpoint.

Stringfellow, T.E.

1984-02-01T23:59:59.000Z

325

Company Name: Roux Associates Web Site: www.rouxinc.com  

E-Print Network [OSTI]

, installation and operation of remediation systems; Environmental sampling - soil and ground water; Oversight estate developers and law firms. Roux's services include environmental site assessment, remediation environmental, health and safety problems associated with air, water, land and interior pollution; hazardous

New Hampshire, University of

326

Method of burning sulfur-containing fuels in a fluidized bed boiler  

DOE Patents [OSTI]

A method of burning a sulfur-containing fuel in a fluidized bed of sulfur oxide sorbent wherein the overall utilization of sulfur oxide sorbent is increased by comminuting the bed drain solids to a smaller average particle size, preferably on the order of 50 microns, and reinjecting the comminuted bed drain solids into the bed. In comminuting the bed drain solids, particles of spent sulfur sorbent contained therein are fractured thereby exposing unreacted sorbent surface. Upon reinjecting the comminuted bed drain solids into the bed, the newly-exposed unreacted sorbent surface is available for sulfur oxide sorption, thereby increasing overall sorbent utilization.

Jones, Brian C. (Windsor, CT)

1982-01-01T23:59:59.000Z

327

Aspen Plus simulations of fluidised beds for chemical looping combustion  

Science Journals Connector (OSTI)

Abstract Chemical Looping Combustion (CLC) is a technology able to generate energy whilst managing CO2 emissions. A system composed by two interconnected fluidised beds is often used in CLC: the two fluidised beds are employed for carrying out the oxidation and reduction reactions of the metal oxide employed as oxygen carrier. In this work, a model to implement fluidised bed systems in Aspen Plus is presented. Depending on the hydrodynamic regimes, two different models are considered: one of the two fluidised beds, called the fuel reactor, is modelled according to the two-phase theory (i.e. emulsion and bubble phase) whilst the other bed, called the air reactor, is assumed to operate in the fast fluidisation regime. Kinetic equations for heterogeneous gas/solid reactions are also considered in the model. Simulation tests for each fluidised bed are carried out, and comparisons are made with experimental data from the literature. A comparison with the largely used Gibbs reactor model is carried out showing the advantages of using the models developed here. In addition, the net heat duty of the whole process is calculated and the role of the main variables that affect the process is investigated.

Rosario Porrazzo; Graeme White; Raffaella Ocone

2014-01-01T23:59:59.000Z

328

Ash level meter for a fixed-bed coal gasifier  

DOE Patents [OSTI]

An ash level meter for a fixed-bed coal gasifier is provided which utilizes the known ash level temperature profile to monitor the ash bed level. A bed stirrer which travels up and down through the extent of the bed ash level is modified by installing thermocouples to measure the bed temperature as the stirrer travels through the stirring cycle. The temperature measurement signals are transmitted to an electronic signal process system by an FM/FM telemetry system. The processing system uses the temperature signals together with an analog stirrer position signal, taken from a position transducer disposed to measure the stirrer position to compute the vertical location of the ash zone upper boundary. The circuit determines the fraction of each total stirrer cycle time the stirrer-derived bed temperature is below a selected set point, multiplies this fraction by the average stirrer signal level, multiplies this result by an appropriate constant and adds another constant such that a 1 to 5 volt signal from the processor corresponds to a 0 to 30 inch span of the ash upper boundary level. Three individual counters in the processor store clock counts that are representative of: (1) the time the stirrer temperature is below the set point (500.degree. F.), (2) the time duration of the corresponding stirrer travel cycle, and (3) the corresponding average stirrer vertical position. The inputs to all three counters are disconnected during any period that the stirrer is stopped, eliminating corruption of the measurement by stirrer stoppage.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

329

Development and applications of clean coal fluidized bed technology  

SciTech Connect (OSTI)

Power generation in Europe and elsewhere relies heavily on coal and coal-based fuels as the source of energy. The reliance will increase in the future due to the decreasing stability of price and security of oil supply. In other words, the studies on fluidized bed combustion systems, which is one of the clean coal technologies, will maintain its importance. The main objective of the present study is to introduce the development and the applications of the fluidized bed technology (FBT) and to review the fluidized bed combustion studies conducted in Turkey. The industrial applications of the fluidized bed technology in the country date back to the 1980s. Since then, the number of the fluidized bed boilers has increased. The majority of the installations are in the textile sector. In Turkey, there is also a circulating fluidized bed thermal power plant with a capacity of 2 x 160 MW under construction at Can in Canakkale. It is expected that the FBT has had, or will have, a significant and increasing role in dictating the energy strategies for Turkey.

Eskin, N.; Hepbasli, A. [Ege University, Izmir (Turkey). Faculty of Engineering

2006-09-15T23:59:59.000Z

330

DNAPL site evaluation. Research report  

SciTech Connect (OSTI)

Dense nonaqueous-phase liquids (DNAPLs), especially chlorinated solvents, are among the most prevalent subsurface contaminants identified in ground-water supplies and at waste disposal sites. There are several site-characterization issues specific to DNAPL sites including: (a) the risk of inducing DNAPL migration by drilling, pumping or other field activities; (b) the use of special sampling and measurement methods to assess DNAPL presence and migration potential; and (c) development of a cost-effective characterization strategy that accounts for DNAPL chemical transport processes, the risk of inducing DNAPL movement during field work, and the data required to select and implement a realistic remedy. The manual provides information to address these issues and describes and evaluates activities that can be used to determine the presence, fate and transport of subsurface DNAPL contamination.

Cohen, R.M.; Mercer, J.W.

1993-02-01T23:59:59.000Z

331

Questa Baseline and Pre-Mining Ground-Water Quality Investigation. 3. Historical Ground-Water  

E-Print Network [OSTI]

............................................................................................................................................................... 9 Mine history and ground-water development ....................................................................................................................................................... 11 Ground-water quality database.......................................................................................................................................................... 29 Compilation of complete database

332

Moving Bed, Granular Bed Filter Development Program: Option 1, Component Test Facility. Task 3, Test plan  

SciTech Connect (OSTI)

In the base contract, Combustion Power Co. developed commercial designs for a moving granular-bed filter (GBF). The proposed filter is similar to previous designs in terms of its shape and method of filtration. The commercial designs have scaled the filter from a 5 ft diameter to as large as a 20 ft diameter filter. In Task 2 of the Moving Bed-Granular Filter Development Program, all technical concerns related to the further development of the filter are identified. These issues are discussed in a Topical Report which has been issued as part of Task 2. Nineteen issues are identified in this report. Along with a discussion of these issues are the planned approaches for resolving each of these issues. These issues will be resolved in either a cold flow component test facility or in pilot scale testing at DOE`s Power System Development Facility (PSDF) located at Southem Company Services` Wilsonville facility. Task 3 presents a test plan for resolving those issues which can be addressed in component test facilities. The issues identified in Task 2 which will be addressed in the component test facilities are: GBF scale-up; effect of filter cone angle and sidewall materials on medium flow and ash segregation; maximum gas filtration rate; lift pipe wear; GBF media issues; mechanical design of the gas inlet duct; and filter pressure drop. This document describes a test program to address these issues, with testing to be performed at Combustion Power Company`s facility in Belmont, California.

Haas, J.C.; Purdhomme, J.W.; Wilson, K.B.

1994-04-01T23:59:59.000Z

333

Ground Motion Studies at NuMI  

SciTech Connect (OSTI)

Ground motion can cause significant deterioration in the luminosity of a linear collider. Vibration of numerous focusing magnets causes continuous misalignments, which makes the beam emittance grow. For this reason, understanding the seismic vibration of all potential LC sites is essential and related efforts in many sites are ongoing. In this document we summarize the results from the studies specific to Fermilab grounds as requested by the LC project leader at FNAL, Shekhar Mishra in FY04-FY06. The Northwestern group focused on how the ground motion effects vary with depth. Knowledge of depth dependence of the seismic activity is needed in order to decide how deep the LC tunnel should be at sites like Fermilab. The measurements were made in the NuMI tunnel, see Figure 1. We take advantage of the fact that from the beginning to the end of the tunnel there is a height difference of about 350 ft and that there are about five different types of dolomite layers. The support received allowed to pay for three months of salary of Michal Szleper. During this period he worked a 100% of his time in this project. That include one week of preparation: 2.5 months of data taking and data analysis during the full period of the project in order to guarantee that we were recording high quality data. We extended our previous work and made more systematic measurements, which included detailed studies on stability of the vibration amplitudes at different depths over long periods of time. As a consequence, a better control and more efficient averaging out of the daytime variation effects were possible, and a better study of other time dependences before the actual depth dependence was obtained. Those initial measurements were made at the surface and are summarized in Figure 2. All measurements are made with equipment that we already had (two broadband seismometers KS200 from GEOTECH and DL-24 portable data recorder). The offline data analysis took advantage of the full Fourier spectra information and the noise was properly subtracted. The basic formalism is summarized if Figure 3. The second objective was to make a measurement deeper under ground (Target hall, Absorber hall and Minos hall - 150 ft to 350 ft), which previous studies did not cover. All results are summarized in Figure 3 and 4. The measurements were covering a frequency range between 0.1 to 50 Hz. The data was taken continuously for at least a period of two weeks in each of the locations. We concluded that the dependence on depth is weak, if any, for frequencies above 1 Hz and not visible at all at lower frequencies. Most of the attenuation (factor of about 2-3) and damping of ground motion that is due to cultural activity at the surface is not detectable once we are below 150 ft underground. Therefore, accelerator currently under consideration can be build at the depth and there is no need to go deeper underground is built at Fermi National Laboratory.

Mayda M. Velasco; Michal Szleper

2012-02-20T23:59:59.000Z

334

FLUIDIZED BED STEAM REFORMER MONOLITH FORMATION  

SciTech Connect (OSTI)

Fluidized Bed Steam Reforming (FBSR) is being considered as an alternative technology for the immobilization of a wide variety of aqueous high sodium containing radioactive wastes at various DOE facilities in the United States. The addition of clay, charcoal, and a catalyst as co-reactants converts aqueous Low Activity Wastes (LAW) to a granular or ''mineralized'' waste form while converting organic components to CO{sub 2} and steam, and nitrate/nitrite components, if any, to N{sub 2}. The waste form produced is a multiphase mineral assemblage of Na-Al-Si (NAS) feldspathoid minerals with cage-like structures that atomically bond radionuclides like Tc-99 and anions such as SO{sub 4}, I, F, and Cl. The granular product has been shown to be as durable as LAW glass. Shallow land burial requires that the mineralized waste form be able to sustain the weight of soil overburden and potential intrusion by future generations. The strength requirement necessitates binding the granular product into a monolith. FBSR mineral products were formulated into a variety of monoliths including various cements, Ceramicrete, and hydroceramics. All but one of the nine monoliths tested met the <2g/m{sup 2} durability specification for Na and Re (simulant for Tc-99) when tested using the Product Consistency Test (PCT; ASTM C1285). Of the nine monoliths tested the cements produced with 80-87 wt% FBSR product, the Ceramicrete, and the hydroceramic produced with 83.3 wt% FBSR product, met the compressive strength and durability requirements for an LAW waste form.

Jantzen, C

2006-12-22T23:59:59.000Z

335

The fluidized bed combustion ash management puzzle  

SciTech Connect (OSTI)

As the electric and industrial power generation industry upgrades and expands, the amount of coal and other solid fuels also expands. With increased environmental controls, the introduction of a competitive market for power, and the increased interest in opportunity fuels will increase the usage of Fluidized Bed Combustion (FBC) boilers in the power industry. The combustion of these solid fuels will generate combustion ashes. Power generators, including FBC boilers owners, have traditionally looked to landfills for the disposal of their ash. With the tighter environmental controls being placed on landfills at the federal and state level, power generators are beginning to see constantly escalating tipping fees which now make the landfill option less attractive. In some instances, landfills are beginning to refuse to accept ash regardless of the tipping fee. In view of this, the power generators are now struggling to find a place to store or dispose of the ash that is produced by their power boiler. Other disposal alternatives such as backhaul to the mine and beneficial reuse are now being considered. Either alternative presents its own set of technical and environmental variables to be considered in developing an effective ash management plan. To be effective, these plans need to incorporate an aggressive, yet realistic, role to support beneficial reuse of the ash. Many applications exist for reuse of the various types of ash. The applications for conventional ashes such as those from pulverized coal boilers and stoker fired boilers are mature and more commonplace. The uses for FBC ash are not as well researched and demonstrated and therefore the marketing opportunities for FBC ash continue to require development. FBC boiler owners and operators must be willing to accept the challenges posed in developing these reuse applications for FBC ash for the market to accept the applications for FBC ash and allow the full value of the FBC ash to be realized.

Fitzgerald, H.B. [ReUse Technology, Inc., Kennesaw, GA (United States)

1996-12-31T23:59:59.000Z

336

A cold model experimental study on the flow characteristics of bed material in a fluidized bed bottom ash cooler in a CFB boiler  

Science Journals Connector (OSTI)

A cold model experimental study on the flowing characteristics of bed material between a fluidized bed ash cooler and a furnace of CFB boiler were discussed in this paper. The research results showed that flowing...

Xiaofeng Lu; Yourong Li

2000-12-01T23:59:59.000Z

337

Influence of mean gas residence time in the bubbling fluidised bed on the performance of a 100-kW dual fluidised bed steam gasifier  

Science Journals Connector (OSTI)

In this study, the influence of mean gas residence time in the bubbling fluidised bed, ? f..., on the performance of a pilot scale 100 kW dual fluidised bed gasifier was experimentally investigate...

W. L. Saw; S. S. Pang

2012-09-01T23:59:59.000Z

338

Data:23149db5-d2fc-459e-86be-d8416875fbe1 | Open Energy Information  

Open Energy Info (EERE)

d2fc-459e-86be-d8416875fbe1 d2fc-459e-86be-d8416875fbe1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navopache Electric Coop, Inc Effective date: End date if known: Rate name: Large Commercial above 50 KVA Secondary Sector: Commercial Description: Source or reference: http://navopache.coopwebbuilder.com/sites/navopache.coopwebbuilder.com/files/large_commercial_2012.pdf. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

339

CSMRI SITE PROJECT SUMMARY November 2010  

E-Print Network [OSTI]

the source, nature and extent of contamination that is resulting in elevated levels of uranium in ground that contained contaminants above the established Site standards for lead, arsenic, and uranium. In some cases soil was excavated down to the bedrock to ensure contaminant identification and excavation. Excavated

340

Remediation of the Maxey Flats Site  

SciTech Connect (OSTI)

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Ground Magnetics At Coso Geothermal Area (1984) | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Ground Magnetics At Coso Geothermal Area (1984) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Coso Geothermal Area (1984) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Ground Magnetics Activity Date 1984 Usefulness useful DOE-funding Unknown Notes The magnetic intensity contours match general geologic patterns in varying rock types. Hydrothermally altered rocks along intersecting fault zones show up as strong magnetic lows that form a triangular-shaped area. This area is centered in an area of highest heat flow and is a site of

342

The influence of multiple tubes on the tube-to-bed heat transfer in a fluidised bed L.M. Armstrong, S. Gu  

E-Print Network [OSTI]

for flow prediction in the past without heat transfer modelling. In the present study, a two-fluid EulerianThe influence of multiple tubes on the tube-to-bed heat transfer in a fluidised bed L.M. Armstrong Keywords: CFD Heat transfer Fluidised bed Eulerian a b s t r a c t There have been few studies modelling

343

Diagnosing and modifying off-site blast effects by seismic means -- A case study  

SciTech Connect (OSTI)

A series of complaints were received from the owners of a 130 year-old farmhouse that had been converted into a bed and breakfast establishment. It was determined that blast effects were most noticeable on the third floor of the farmhouse. A vibration study was proposed aimed at isolating the actual cause of the perceived vibration. To aid in this determination, a customized, split-cable seismograph utilizing three single component transducers was deployed both in the interior and exterior of the farmhouse for two primary blasts. By utilizing a monitoring technique involving both interior and exterior sensors from a single seismograph, vibration time-histories from the three locations could be time-linked, providing an accurate assessment as to the actual mechanism responsible for the complaints. In this case, the split-cable array provided data indicating a low frequency ground vibration effect. Amplification of structure vibration due to the matching of the natural frequency of the farmhouse and the transmitted ground vibration was identified as the probable cause of the complaints. Given the potential impact of low frequency energy with surrounding properties, an analytical approach based on the concept of linear superpositioning was used to determine optimum delay intervals to reduce the off-site impact of future production blasts. Single-hole test blast data was recorded with traditional seismographs and analyzed using vibration control software. Utilization of recommended blasthole sequencing, combined with a change in blast orientation, resulted in the elimination of complaints at the farmhouse, in reduced vibration values at other neighboring properties and in a reduction in the overall liability exposure.

Brashear, S.; Brush, R.; Cook, B.

1995-12-31T23:59:59.000Z

344

Hydraulic fracturing tests in anhydrite interbeds in the WIPP, Marker Beds 139 and 140  

SciTech Connect (OSTI)

Hydraulic fracturing tests were integrated with hydrologic tests to estimate the conditions under which gas pressure in the disposal rooms in the Waste Isolation Pilot Plant, Carlsbad, NM (WIPP) will initiate and advance fracturing in nearby anhydrite interbeds. The measurements were made in two marker beds in the Salado formation, MB139 and MB140, to explore the consequences of existing excavations for the extrapolation of results to undisturbed ground. The interpretation of these measurements is based on the pressure-time records in two injection boreholes and several nearby hydrologic observation holes. Data interpretations were aided by post-test borehole video surveys of fracture traces that were made visible by ultraviolet illumination of fluorescent dye in the hydraulic fracturing fluid. The conclusions of this report relate to the upper- and lower-bound gas pressures in the WIPP, the paths of hydraulically and gas-driven fractures in MB139 and MB140, the stress states in MB139 and MB140, and the probable in situ stress states in these interbeds in undisturbed ground far away from the WIPP.

Wawersik, W.R., Carlson, L.W., Henfling, J.A., Borns, D.J., Beauheim, R.L. [Sandia National Labs., Albuquerque, NM (United States); Howard, C.L. [RE/SPEC Inc., Albuquerque, NM (United States); Roberts, R.M., [INTERA Inc., Albuquerque, NM (United States)

1997-05-01T23:59:59.000Z

345

Ground Magnetics | Open Energy Information  

Open Energy Info (EERE)

Ground Magnetics Ground Magnetics Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Magnetics Details Activities (15) Areas (12) Regions (0) NEPA(1) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Magnetic Techniques Parent Exploration Technique: Magnetic Techniques Information Provided by Technique Lithology: Presence of magnetic minerals such as magnetite. Stratigraphic/Structural: Mapping of basement structures, horst blocks, fault systems, fracture zones, dykes and intrusions. Hydrological: The circulation of hydrothermal fluid may impact the magnetic susceptibility of rocks. Thermal: Rocks lose their magnetic properties at the Curie temperature (580° C for magnetite) [1] and, upon cooling, remagnetize in the present magnetic field orientation. The Curie point depth in the subsurface may be determined in a magnetic survey to provide information about hydrothermal activity in a region.

346

Dynamic Rupture through a Branched Fault Configuration at Yucca Mountain, and Resulting Ground Motions  

E-Print Network [OSTI]

Dynamic Rupture through a Branched Fault Configuration at Yucca Mountain, and Resulting Ground of Yucca Mountain, Nevada, a potential site for a high-level radioactive waste repository. The Solitario km away from the SCF beneath the crest of Yucca Mountain, causing the repository site to experience

347

Hanford Site Safety Standards - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Rigging Manual DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual Hanford Site LockoutTagout Procedure DOE-0336, Hanford Site LockoutTagout Procedure (PDF) Hanford...

348

Advances in mathematical modeling of fluidized bed gasification  

Science Journals Connector (OSTI)

Abstract Gasification is the thermochemical conversion of solid fuel into the gas which contains mainly hydrogen, carbon monoxide, carbon dioxide, methane and nitrogen. In gasification, fluidized bed technology is widely used due to its various advantageous features which include high heat transfer, uniform and controllable temperature and favorable gas–solid contacting. Modeling and simulation of fluidized bed gasification is useful for optimizing the gasifier design and operation with minimal temporal and financial cost. The present work investigates the different modeling approaches applied to the fluidized bed gasification systems. These models are broadly classified as the equilibrium model and the rate based or kinetic model. On the other hand, depending on the description of the hydrodynamic of the bed, fluidized bed models may also be classified as the two-phase flow model, the Euler–Euler model and the Euler–Lagrange model. Mathematical formulation of each of the model mentioned above and their merits and demerits are discussed. Detail reviews of different model used by different researchers with major results obtained by them are presented while the special focus is given on Euler–Euler and Euler–Lagrange CFD models.

Chanchal Loha; Sai Gu; Juray De Wilde; Pinakeswar Mahanta; Pradip K. Chatterjee

2014-01-01T23:59:59.000Z

349

Materials performance in fluidized-bed air heaters  

SciTech Connect (OSTI)

Development of cogeneration systems that involve combustion of coal in a fluidized bed and use of air heaters to generate hot air for turbine systems has been in progress for a number of years. The US Department of Energy (DOE) sponsored the Atmospheric Fluidized-Bed Cogeneration Air Heater Experiment (ACAHE) to assess the performance of various heat exchanger materials and establish confidence in the resultant designs of fluidized-bed-combustion air heater systems. Westinghouse Electric Corporation, in association with Babcock & Wilcox, Foster Wheeler, and ABB/Combustion Engineering, prepared specifications and hardware for the ACAHE. Argonne National Laboratory, through a contract with the Rocketdyne Division of Rockwell International, conducted tests in the DOE 1.8 {times} 1.8 m atmospheric fluidized-bed combustion facility in El Segundo, California. This paper presents an assessment of the materials performance in fluidized bed environments and examines guidelines for materials selection on the basis of corrosion resistance in air and in combustion environments, mechanical properties, fabricability/thermal stability, and cost.

Natesan, K.; Podolski, W.

1991-12-01T23:59:59.000Z

350

Materials performance in fluidized-bed air heaters  

SciTech Connect (OSTI)

Development of cogeneration systems that involve combustion of coal in a fluidized bed and use of air heaters to generate hot air for turbine systems has been in progress for a number of years. The US Department of Energy (DOE) sponsored the Atmospheric Fluidized-Bed Cogeneration Air Heater Experiment (ACAHE) to assess the performance of various heat exchanger materials and establish confidence in the resultant designs of fluidized-bed-combustion air heater systems. Westinghouse Electric Corporation, in association with Babcock Wilcox, Foster Wheeler, and ABB/Combustion Engineering, prepared specifications and hardware for the ACAHE. Argonne National Laboratory, through a contract with the Rocketdyne Division of Rockwell International, conducted tests in the DOE 1.8 {times} 1.8 m atmospheric fluidized-bed combustion facility in El Segundo, California. This paper presents an assessment of the materials performance in fluidized bed environments and examines guidelines for materials selection on the basis of corrosion resistance in air and in combustion environments, mechanical properties, fabricability/thermal stability, and cost.

Natesan, K.; Podolski, W.

1991-12-01T23:59:59.000Z

351

Six years of ABB-CE, petcoke and fluid beds  

SciTech Connect (OSTI)

Combustion Engineering, Inc. (ABB-CE) has constructed twenty circulating fluidized bed (CFB) boilers and 2 bubbling fluidized bed (BFB) boilers throughout North America. The units were designed to fire a wide range of fuels from anthracite culm to coals, lignites and biomasses. Based on fuels economics, some plants have decided to use petroleum coke as a replacement or supplemental fuel. The fluid bed boiler can inherently handle a wide range of fuel types without requiring modification or down-rating. ABB-CE units have a significant amount of petroleum coke operating experience firing 100% petroleum coke with no supplemental fuel ranging from the first commercial CFB unit at New Brunswick Power to the largest CFB unit at Texas New Mexico Power. Petroleum coke is also being co-fired with anthracite culm at the Scott Paper CFB. The world`s largest operating BFB, the 160 MWe unit at TVA`s Shawnee plant, has also been co-firing petroleum coke. The ability of the fluidized bed technology to fire low volatile fuels such as petroleum cokes, efficiently and in an environmentally acceptable manner will result in the use of this technology as a preferred means of power generation. This report gives a brief description of the petroleum coke firing experiences with ABB-CE fluid bed steam generators over the last six years.

Tanca, M.

1994-12-31T23:59:59.000Z

352

Determination of electrical resistivity of dry coke beds  

SciTech Connect (OSTI)

The electrical resistivity of the coke bed is of great importance when producing FeMn, SiMn, and FeCr in a submerged arc furnace. In these processes, a coke bed is situated below and around the electrode tip and consists of metallurgical coke, slag, gas, and metal droplets. Since the basic mechanisms determining the electrical resistivity of a coke bed is not yet fully understood, this investigation is focused on the resistivity of dry coke beds consisting of different carbonaceous materials, i.e., coke beds containing no slag or metal. A method that reliably compares the electrical bulk resistivity of different metallurgical cokes at 1500{sup o} C to 1600{sup o}C is developed. The apparatus is dimensioned for industrial sized materials, and the electrical resistivity of anthracite, charcoal, petroleum coke, and metallurgical coke has been measured. The resistivity at high temperatures of the Magnitogorsk coke, which has the highest resistivity of the metallurgical cokes investigated, is twice the resistivity of the Corus coke, which has the lowest electrical resistivity. Zdzieszowice and SSAB coke sort in between with decreasing resistivities in the respective order. The electrical resistivity of anthracite, charcoal, and petroleum coke is generally higher than the resistivity of the metallurgical cokes, ranging from about two to about eight times the resistivity of the Corus coke at 1450{sup o}C. The general trend is that the bulk resistivity of carbon materials decreases with increasing temperature and increasing particle size.

Eidem, P.A.; Tangstad, M.; Bakken, J.A. [NTNU, Trondheim (Norway)

2008-02-15T23:59:59.000Z

353

Superfund Record of Decision (EPA Region 6): Fourth Street Abandoned Refinery Site, Oklahoma City, OK, September 1993  

SciTech Connect (OSTI)

The decision document presents the selected remedial action for the Fourth Street Refinery Site (FSR site), Oklahoma City, Oklahoma, for the Ground Water Operable Unit. The Record of Decision (ROD) addresses the contamination in the ground water, which includes non-aqueous phase liquids. Principal threat wastes include 'pools' of dense non-aqueous phase liquids (DNAPLs) submerged beneath the ground water or in fractured bedrock, or NAPLs floating on water. This Ground Water Operable Unit addresses the principal threat at the site by monitoring the ground water to ensure that the contaminant levels are reduced with time due to natural attenuation, once the surface contamination is removed.

Not Available

1993-09-01T23:59:59.000Z

354

Superfund record of decision (EPA Region 6): Double Eagle Refinery Site, operable unit 2, Oklahoma City, OK, April 19, 1994  

SciTech Connect (OSTI)

The decision document presents the selected remedial action for the Double Eagle Refinery Site (DER site), in Oklahoma City, Oklahoma, for the Ground Water Operable Unit. Principal threat wastes include `pools` of dense non-aqueous phase liquids (DNAPLs) submerged beneath the ground water or in fractured bedrock. The Ground Water Operable Unit (GOU) addresses the principal threat at the site by monitoring the ground water to ensure that the contaminant levels are reduced with time due to natural attenuation, once the surface contamination is addressed, so that the surface contamination will no longer provide a source of contamination to the ground water.

NONE

1995-02-01T23:59:59.000Z

355

Division Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Dioxide Reduction Catalysts Carbon Dioxide Reduction Catalysts Our research program is directed toward developing and understanding metal complexes that catalyze reactions relevant to renewable energy, particularly those that reduce carbon dioxide to fuels or fuel precursors. Carbon dioxide reduction catalysts are important targets because they could enable "recycling" of hydrocarbon fuels, thus lowering their carbon footprint. Our research addresses two key challenges in this area. First, we aim to improve the lifetimes, activity, and selectivity of homogeneous catalysts by incorporating them into porous heterogeneous frameworks derived from structurally persistent organic polymers. These frameworks allow isolation of the catalytic centers, which inhibits reaction pathways that lead to catalyst decomposition, and enable the spatially controlled deployment of ancillary functional groups that bind and concentrate substrate near the active site and/or assist with its activation. Second, we are developing homogeneous dual-catalyst systems and assemblies that couple CO2 reduction catalysis to a parallel catalytic reaction that provides the reducing equivalents. We are especially interested in proton-coupled electron-transfer reactions involving activation of H2 and of organic dehydrogenation substrates, wherein the proton pathway also participates in the conversion of CO2 to CO. In both of these research thrusts we are studying catalysts that may be activated under thermal, electrochemical, or photochemical conditions.

356

Effect of topography on ground movement due to longwall mining  

SciTech Connect (OSTI)

This paper presents an analysis of the effects of topography on static and dynamic ground movements and severity of damage inflicted on surface structures. A typical site containing varying topographical features (i.e., mountains, hillsides, valleys, and flat bottom land) representing the northern Appalachian region was chosen for the study. Typical subsidence monitoring techniques were employed. Frequent measurements were made as the face advanced.

Khair, A.W.; Quinn, M.K.; Chaffins, R.D.

1988-08-01T23:59:59.000Z

357

Hanford Site Wide Programs - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Decrease Font Size Hanford Site Wide Programs Hanford Safety Hanford Site Wide Programs Hanford Fire Department Health & Safety Exposition Hanford Traffic Safety Hanford...

358

Instrumentation for CTA site characterization  

E-Print Network [OSTI]

Many atmospheric and climatic criteria have to be taken into account for the selection of a suitable site for the next generation of imaging air-shower Cherenkov telescopes, the "Cherenkov Telescope Array" CTA. Such data are not available with sufficient precision or the comparability to allow for a comprehensive characterization of the proposed sites to be made. Identical cross-calibrated instruments have been developed which allow for precise comparison between sites, the cross-validation of existing data, and the ground-validation of satellite data. The site characterization work package of the CTA consortium opted to construct and deploy 9 copies of an autonomous multi-purpose weather sensor, incorporating an infrared cloud sensor a newly developed sensor for measuring the light of the night sky, and an All-Sky-Camera, the whole referred to as Autonomous Tool for Measuring Observatory Site COnditions PrEcisely (ATMOSCOPE). We present here the hardware that was combined into the ATMOSCOPE and characterize ...

Fruck, Christian; Ernenwein, Jean-Pierre; Mandát, Dušan; Schweizer, Thomas; Häfner, Dennis; Bulik, Tomasz; Cieslar, Marek; Costantini, Heide; Dominik, Michal; Ebr, Jan; Garczarczyk, Markus; Lorentz, Eckart; Pareschi, Giovanni; Pech, Miroslav; Puerto-Giménez, Irene; Teshima, Masahiro

2015-01-01T23:59:59.000Z

359

Photo Gallery - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act, 618-10, burial ground, 12.18.09 Area: 618-10 Description: Pete Toolson's job as a Quality Assurance Engineer at the 618-10 Burial Ground was created by Recovery Act dollars...

360

Broadband Ground-Plane Cloak  

Science Journals Connector (OSTI)

...automated design process. The ground-plane...Maxwell's equations implies that...number of simulations of the metamaterial...cloak-design process and makes...Jacobian matrix {lambda...Jacobian matrix). In our...retrieval process, modified...numerical simulation. A regression...a single Matlab program...Adobe Acrobat PDF format...

R. Liu; C. Ji; J. J. Mock; J. Y. Chin; T. J. Cui; D. R. Smith

2009-01-16T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Cooking with Ground Pork (Spanish)  

E-Print Network [OSTI]

? 10 minutos, o hasta que las tiras de tortilla est?n suaves. S?rvalo caliente. Adaptado de Commodity Fact Sheet for USDA Household Programs: Frozen Ground Pork (folleto de informaci?n sobre productos preparado para los Programas del Hogar del...

Anding, Jenna

2008-12-09T23:59:59.000Z

362

Coal hydrogenation and deashing in ebullated bed catalytic reactor  

DOE Patents [OSTI]

An improved process for hydrogenation of coal containing ash with agglomeration and removal of ash from an ebullated bed catalytic reactor to produce deashed hydrocarbon liquid and gas products. In the process, a flowable coal-oil slurry is reacted with hydrogen in an ebullated catalyst bed reaction zone at elevated temperature and pressure conditions. The upward velocity and viscosity of the reactor liquid are controlled so that a substantial portion of the ash released from the coal is agglomerated to form larger particles in the upper portion of the reactor above the catalyst bed, from which the agglomerated ash is separately withdrawn along with adhering reaction zone liquid. The resulting hydrogenated hydrocarbon effluent material product is phase separated to remove vapor fractions, after which any ash remaining in the liquid fraction can be removed to produce substantially ash-free coal-derived liquid products.

Huibers, Derk T. A. (Pennington, NJ); Johanson, Edwin S. (Princeton, NJ)

1983-01-01T23:59:59.000Z

363

Simulation of petcoke gasification in slagging moving bed reactors  

Science Journals Connector (OSTI)

A mathematical model for simulation of moving bed petcoke gasifiers was developed. The model introduces a new feed characterization method, gas-phase resistance and volatilization models. The model is validated using reported data for a slagging gasifier. Effect of feed oxygen-to-coke and steam-to-coke ratios and feed coke rates on gasification performance was examined. Slagging zone moving bed gasifier operation with very high petcoke fluxes of over 4000 kg/m2/h was possible with high petcoke conversion. Peak gas temperatures exceeded 1500 °C. Fluxes higher than 5000 kg/m2/h are limited by an approach to fluidization of small particles in the combustion zone. The moving bed gasifier performance was found superior to performance of an entrained flow gasifier (EFG) with respect to energy efficiency and oxygen consumption.

Soumitro Nagpal; T.K. Sarkar; P.K. Sen

2005-01-01T23:59:59.000Z

364

Decontamination of combustion gases in fluidized bed incinerators  

DOE Patents [OSTI]

Sulfur-containing atmospheric pollutants are effectively removed from exit gas streams produced in a fluidized bed combustion system by providing a fluidized bed of particulate material, i.e. limestone and/or dolomite wherein a concentration gradient is maintained in the vertical direction. Countercurrent contacting between upwardly directed sulfur containing combustion gases and descending sorbent particulate material creates a concentration gradient across the vertical extent of the bed characterized in progressively decreasing concentration of sulfur, sulfur dioxide and like contaminants upwardly and decreasing concentration of e.g. calcium oxide, downwardly. In this manner, gases having progressively decreasing sulfur contents contact correspondingly atmospheres having progressively increasing concentrations of calcium oxide thus assuring optimum sulfur removal.

Leon, Albert M. (Mamaroneck, NY)

1982-01-01T23:59:59.000Z

365

DoD ESTCP Energy Test Bed Project  

Broader source: Energy.gov (indexed) [DOE]

ESTCP Energy Test Bed Project ESTCP Energy Test Bed Project EW-201016 "High Efficiency - Reduced Emissions Boiler Controls" 23 May 2012 Dr. Jim Galvin ESTCP Program Manager for Energy & Water ESTCP Energy Test Bed Project Location 2 3 Boiler Efficiency Improvement Demo Oxygen Sensor Servo Controls * 90% of boilers lack automated controls * State of the art automated controls sense only oxygen * Demonstrated prototype sensed oxygen and carbon monoxide Prototype CO Sensor Key Findings Boiler Before Demo 4 * Size: 25 MMBtu * Age: 30 years * Fuel: Natural Gas or Oil * Demo performed by United Technologies Research Center * Technology demonstrated: Fireye PPC4000 (Oxygen trim control) * Upgraded PPC4000 tested as a prototype 5 Three Phased Test ● Test Phase 1: Existing Legacy System (baseline)

366

Site Map | DOEpatents  

Office of Scientific and Technical Information (OSTI)

Site Map Site Map Home Basic Search Advanced Search DOEpatents FAQ About DOEpatents Site Map Contact Us Website PoliciesImportant Links...

367

Site Monitoring Area Maps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

368

Lateral solids dispersion coefficient in large-scale fluidized beds  

SciTech Connect (OSTI)

The design of fuel feed ports in a large-scale fluidized bed combustor depends on the fuel characteristics and lateral solids mixing. However, the reported values of the effective lateral solids dispersion coefficient (D{sub sr}) are scattered in the broad range of 0.0001-0.1 m{sup 2}/s. With the aim of predicting D{sub sr} in wider fluidized beds which is difficult to measure directly or deduce from experimental results in lab-scale facilities, a computational method is proposed. It combines the Eulerian-Granular simulation and fictitious particle tracing technique. The value of D{sub sr} is calculated based on the movement of the tracers. The effect on D{sub sr} of bed width (W) ranging from 0.4 m up to 12.8 m at different levels of superficial gas velocity (U{sub 0}) is investigated. It is found that increasing W whilst maintaining U{sub 0}, D{sub sr} initially increases markedly, then its increase rate declines, and finally it stays around a constant value. The computed values of D{sub sr} are examined quantitatively and compared with a thorough list of the measured D{sub sr} in the literature since 1980s. Agreed with the measurements performed in the pilot-scale fluidized beds, the value of D{sub sr} in wider facilities at higher fluidizing velocities is predicted to be around the order of magnitude of 0.1 m{sup 2}/s, much higher than that in lab-scale beds. Finally, the effect of D{sub sr} on the distribution of fuel particles over the cross section in fluidized beds with the specified layout of feed ports is discussed. (author)

Liu, Daoyin; Chen, Xiaoping [School of Energy and Environment, Southeast University, Nanjing 210096 (China)

2010-11-15T23:59:59.000Z

369

Ground-water contribution to dose from past Hanford Operations. Hanford Environmental Dose Reconstruction Project  

SciTech Connect (OSTI)

The Hanford Environmental Dose Reconstruction (HEDR) Project is being conducted to estimate radiation doses that populations and individuals could have received from Hanford Site operations from 1944 to the present. Four possible pathways by which radionuclides migrating in ground water on the Hanford Site could have reached the public have been identified: (1) through contaminated ground water migrating to the Columbia River; (2) through wells on or adjacent to the Hanford Site; (3) through wells next to the Columbia River downstream of Hanford that draw some or all of their water from the river (riparian wells); and (4) through atmospheric deposition resulting in contamination of a small watershed that, in turn, results in contamination of a shallow well or spring by transport in the ground water. These four pathways make up the ``ground-water pathway,`` which is the subject of this study. Assessment of the ground-water pathway was performed by (1) reviewing the existing extensive literature on ground water and ground-water monitoring at Hanford and (2) performing calculations to estimate radionuclide concentrations where no monitoring data were collected. Radiation doses that would result from exposure to these radionuclides were calculated.

Freshley, M.D.; Thorne, P.D.

1992-08-01T23:59:59.000Z

370

A case history of a fixed bed, coal-derived oil hydrotreater  

Science Journals Connector (OSTI)

With the apparent shrinkage in the worldwide supply of liquid hydrocarbon fuels, upgrading of coal-derived liquids to synthetic crude oils will eventually emerge as a commercial entity. Although the Char-Oil-Energy Development (COED) Project has been shelved in the short term, information about the reaction engineering of the upgrading of coal-derived liquids by hydrotreatment in the COED Process should be relevant to upgrading technologies for other coal liquefaction processes. The COED Process was developed by FMC Corporation and the Office of Coal Research (now DOE) in the late 1960's and early 1970's. The process produced a synthetic crude oil, medium Btu gas and char by multi-stage, fluidized bed pyrolysis of coal. The raw coal-tar produced by pyrolysis was upgraded to synthetic crude oil by catalytic, fixed-bed hydrotreatment. Raw coal-tar has different properties from petroleum-derived oils, and upgrading by hydrotreatment is not an off-the-shelf technology. A 30 barrel per day fixed-bed hydrotreater was constructed and operated at the COED pilot plant site. The pilot plant hydrotreater design was based on conventional petroleum residua hydrotreatment technology together with bench-scale hydrotreatment tests performed by ARCO in the 1960's utilizing coal-tars produced in a process development unit. The pilot plant hydrotreater did operate for about four years providing valuable information about the reaction engineering of the hydrotreatment process as well as providing numerous samples for applications studies performed by other DOE contractors and interested potential users of the COED syncrude. Of note, 50,000 gallons of COED syncrude were supplied to the U.S. Naval Ship Engineering Center for shipboard testing in the boilers of the U.S.S. Johnston on November 15–16th, 1973. This paper deals with the reaction engineering of the guard chamber and fixed-bed hydrotreatment reactors at the COED facility. Of major importance is the study of the role of the feedstock (pyrolysis coal-tar) properties and their effects on the catalysts utilized in the reactors. A working kinetic model has been derived that could allow a designer to optimize a particular set of design parameters and a plant operator to determine catalyst life. A quantitative comparison has been made of the effect of metals content of coal-derived oils and petroleum resids on catalyst deactivation.

Marvin I. Greene

1981-01-01T23:59:59.000Z

371

Advanced Circulating Pressurized Fluidized Bed Combustion (APFBC) Repowering Considerations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Weinstein & Travers: APFBC Repowering Considerations Weinstein & Travers: APFBC Repowering Considerations paper 970563 Page 1 of 35 Advanced Circulating Pressurized Fluidized Bed Combustion (APFBC) Repowering Considerations Richard E. Weinstein, P.E. Parsons Power Group Inc. Reading, Pennsylvania eMail: Richard_E_Weinstein@Parsons.COM / phone: 610 / 855-2699 Robert W. Travers, P.E. U.S. Department of Energy Office of Fossil Energy Germantown, Maryland eMail: Robert.Travers@HQ.DOE.GOV / phone: 301 / 903-6166 Weinstein & Travers: APFBC Repowering Considerations paper 970563 Page 2 of 35 Advanced Circulating Pressurized Fluidized Bed Combustion Repowering Considerations ABSTRACT ..............................................................................................................................................................................

372

Refractory experience in circulating fluidized bed combustors, Task 7  

SciTech Connect (OSTI)

This report describes the results of an investigation into the status of the design and selection of refractory materials for coal-fueled circulating fluidized-bed combustors. The survey concentrated on operating units in the United States manufactured by six different boiler vendors: Babcock and Wilcox, Combustion Engineering, Foster Wheeler, Keeler Dorr-Oliver, Pyropower, and Riley Stoker. Information was obtained from the boiler vendors, refractory suppliers and installers, and the owners/operators of over forty units. This work is in support of DOE's Clean Coal Technology program, which includes circulating fluidized-bed technology as one of the selected concepts being evaluated.

Vincent, R.Q.

1989-11-01T23:59:59.000Z

373

Control of thermal processes in a fluidized bed combustor (FBC)  

SciTech Connect (OSTI)

Heat and mass balance equations for the transient process of a fluidized bed furnace are described. The equations involve heat release from char and volatiles combustion, heat consumption during moisture evaporation, and heating of char and circulating particles. Calculations and experimental data for steady-state and unsteady conditions are compared. The results show that the height of the dense bed, the excess-air ratio and kinetic features of the fuel affect the rate of the transient process. The time constant for a disturbance by a change of the air flow rate was found to be smaller than the one for a change of the fuel input.

Munts, V.A.; Filippovskij, N.F.; Baskakov, A.P.; Pavliok, E.J. [Ural State Technical Univ., Ekaterinburg (Russian Federation). Heat Power Dept.; Leckner, B. [Chalmers Univ. of Technology, Gothenburg (Sweden). Dept. of Energy Conversion

1997-12-31T23:59:59.000Z

374

Influence of partial wetting on trickle-bed reactor performance  

E-Print Network [OSTI]

was started once the hydrogen flow rate stabilized. The time required for 4he first drop to appear at the vapor/liquid separator ranged from ]0 ? 40 minutes, depending on the liquid flow rate. The liquid flow rate was measured by monitoring the liquid level..., conversion with we4t, ing efficiency . 23 25 Experiment, al apparatus 6. Cross sect, ion of experimental trickle-bed reactor 7. Approach to steady stale 8. Catalyst, bed axial temperature profiles Change in the exit conversion with liquid flow rate...

Ruecker, Craig Michael

2012-06-07T23:59:59.000Z

375

Neutronic analysis of pebble-bed cores with transuranics  

E-Print Network [OSTI]

(ORNL). This Department of Energy sponsored center is authorized to collect, maintain, analyze, and distribute computer software and data sets in the area of radiation transport and safety. The full-core VHTR pebble-bed model was developed... II.A SCALE 5.0 The 3D full-core pebble-bed VHTR model was initially built using SCALE version 5.0. The modular code system is developed and maintained by ORNL and is readily validated and accepted for use in thermal reactor analysis around...

Pritchard, Megan Leigh

2009-05-15T23:59:59.000Z

376

Effective thermal conductivity of packed beds of spheres  

E-Print Network [OSTI]

of N are known only for certain types of regular packing, however, an empirical relation for m ) 0. 3 is given as N = 11. 6(l ? m) (22) When a load is applied to a bed of spheres, the contact area between spheres is determined using the Hertz... the authors compared their analytical solutions to has consistently dealt with beds of materials which have a very low thermal conductivity compared to that of the brass and aluminum spheres. These materials have been solid and hollow glass spheres, ceramic...

Duncan, Allen Buchanan

1987-01-01T23:59:59.000Z

377

Characterization of bedded salt for storage caverns -- A case study from the Midland Basin, Texas  

SciTech Connect (OSTI)

The geometry of Permian bedding salt in the Midland Basin is a product of interaction between depositional facies and postdepositional modification by salt dissolution. Mapping high-frequency cycle patterns in cross section and map view using wireline logs documents the salt geometry. Geologically based interpretation of depositional and dissolution processes provides a powerful tool for mapping and geometry of salt to assess the suitability of sites for development of solution-mined storage caverns. In addition, this process-based description of salt geometry complements existing data about the evolution of one of the best-known sedimentary basins in the world, and can serve as a genetic model to assist in interpreting other salts.

Hovorka, Susan D.; Nava, Robin

2000-06-13T23:59:59.000Z

378

Chapter 3: Building Siting  

Broader source: Energy.gov (indexed) [DOE]

: Building Siting : Building Siting Site Issues at LANL Site Inventory and Analysis Site Design Transportation and Parking LANL | Chapter 3 Site Issues at LANL Definitions and related documents Building Siting Laboratory site-wide issues include transportation and travel distances for building occupants, impacts on wildlife corridors and hydrology, and energy supply and distribution limitations. Decisions made during site selec- tion and planning impact the surrounding natural habitat, architectural design integration, building energy con- sumption, occupant comfort, and occupant productivity. Significant opportunities for creating greener facilities arise during the site selection and site planning stages of design. Because LANL development zones are pre- determined, identify the various factors affecting devel-

379

Laboratory Experiments and Hydrodynamic Modeling of a Bed Leveler Used to Level the Bottom of Ship Channels after Dredging  

E-Print Network [OSTI]

This study was conducted to ascertain the impacts of bed leveling, following ship channel dredging operations, and to also investigate the hydrodynamic flow field around box bed levelers. Laboratory experiments were conducted with bed levelers...

Paul, Ephraim Udo

2011-02-22T23:59:59.000Z

380

Practical and Regulatory Challenges in Controlling Trace Element Inputs to Soils from Land Application of Fluidized Bed Combustion Residues  

Science Journals Connector (OSTI)

The 165 MWe circulating fluidized bed boiler at the Nova Scotia Power Inc. ( ... largest fluidized bed unit. Fluidized bed combustion (FBC) allows the burning of high sulphur (...in situ capture of S (removal of ...

M. Hope-Simpson; W. Richards

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

MIDC: Web Site Search  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MIDC Web Site Search Enter words or phrases: Search Clear Help Also see the site directory. NREL MIDC...

382

Ground Magnetics (Nannini, 1986) | Open Energy Information  

Open Energy Info (EERE)

Ground Magnetics (Nannini, 1986) Ground Magnetics (Nannini, 1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics (Nannini, 1986) Exploration Activity Details Location Unspecified Exploration Technique Ground Magnetics Activity Date Usefulness not indicated DOE-funding Unknown Notes Detection and quantitative assessment of such intrusive events can be facilitated by magnetic surveys (ground or aerial magnetic field measurements). These surveys are based on the magnetic susceptibility contrast between magmatic rocks at depth and the sedimentary formations above. References Raffaello Nannini (1986) Some Aspects Of Exploration In Non-Volcanic Areas Retrieved from "http://en.openei.org/w/index.php?title=Ground_Magnetics_(Nannini,_1986)&oldid=388291

383

E-Print Network 3.0 - anomalously high bed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that alternates low-R oil-saturated sand beds and high... in thinly bedded formations Jordan G. Mimoun1 , Carlos Torres-Verdin2 , and William E. Preeg3 ABSTRACT We... have...

384

An adaptable, low cost test-bed for unmanned vehicle systems research.  

E-Print Network [OSTI]

?? An unmanned vehicle systems test-bed has been developed. The test-bed has been designed to accommodate hardware changes and various vehicle types and algorithms. The… (more)

Goppert, James M.

2011-01-01T23:59:59.000Z

385

E-Print Network 3.0 - airborne experimental test-bed Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

experimental test-bed Search Powered by Explorit Topic List Advanced Search Sample search results for: airborne experimental test-bed Page: << < 1 2 3 4 5 > >> 1 National Airborne...

386

DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOEOE...

387

Modularity of the MIT Pebble Bed Reactor for use by the commercial power industry  

E-Print Network [OSTI]

The Modular Pebble Bed Reactor is a small high temperature helium cooled reactor that is being considered for both electric power and hydrogen production. Pebble bed reactors are being developed in South Africa, China and ...

Hanlon-Hyssong, Jaime E

2008-01-01T23:59:59.000Z

388

E-Print Network 3.0 - arrester beds Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 > >> 1 Joint initiation in bedded clastic rocks David T. McConaughy1 Summary: arrest lines and at bed boundaries. The hackle marks converge on a location from which the joint......

389

The Agglomeration in the Fluidized Bed Boiler During the Co-Combustion of Biomass with Peat  

Science Journals Connector (OSTI)

The formation of bed material coatings during the co-combustion of peat and biomass is caused by iron, calcium, aluminum ... Thus the bed material agglomeration during peat and biomass co-combustion is due to the...

Ritva E. A. Heikkinen; Mika E. Virtanen…

1999-01-01T23:59:59.000Z

390

TEX-A-SYST: Reducing the Risk of Ground Water Contamination by Improving Livestock Holding Pen Management  

E-Print Network [OSTI]

Open lots or holding pens for feeding or holding livestock can be sources of ground water contamination. The safety of such operations depends on their separation from water wells, characteristics of the site, and proper management. This publication...

Harris, Bill L.; Hoffman, D.; Mazac Jr., F. J.

1997-08-29T23:59:59.000Z

391

Remediation of ground water containing chlorinated and brominated hydrocarbons, benzene and chromate by sequential treatment using ZVI and GAC  

Science Journals Connector (OSTI)

A laboratory experiment with two sequenced columns was performed as a preliminary study for the installation of a permeable reactive barrier (PRB) at a site where a mixed ground water contamination exists. The...

Volkmar Plagentz; Markus Ebert; Andreas Dahmke

2006-03-01T23:59:59.000Z

392

Method for using fast fluidized bed dry bottom coal gasification  

DOE Patents [OSTI]

Carbonaceous solid material such as coal is gasified in a fast fluidized bed gasification system utilizing dual fluidized beds of hot char. The coal in particulate form is introduced along with oxygen-containing gas and steam into the fast fluidized bed gasification zone of a gasifier assembly wherein the upward superficial gas velocity exceeds about 5.0 ft/sec and temperature is 1500.degree.-1850.degree. F. The resulting effluent gas and substantial char are passed through a primary cyclone separator, from which char solids are returned to the fluidized bed. Gas from the primary cyclone separator is passed to a secondary cyclone separator, from which remaining fine char solids are returned through an injection nozzle together with additional steam and oxygen-containing gas to an oxidation zone located at the bottom of the gasifier, wherein the upward gas velocity ranges from about 3-15 ft/sec and is maintained at 1600.degree.-200.degree. F. temperature. This gasification arrangement provides for increased utilization of the secondary char material to produce higher overall carbon conversion and product yields in the process.

Snell, George J. (Fords, NJ); Kydd, Paul H. (Lawrenceville, NJ)

1983-01-01T23:59:59.000Z

393

Characterization of a solar-powered fluidyne test bed  

Science Journals Connector (OSTI)

Abstract Liquid piston Stirling engines (sometimes termed “fluidyne” engines) have been studied extensively and applied in a variety of energy conversion applications. They are attractive for low capital costs and simplicity of construction. In addition, their operation as external combustion engines allows for flexibility in primary energy sources which is a distinct advantage when a low-cost or free source of heat can be paired with their minimal construction costs. Disadvantages of these devices include relatively low efficiency and low power density. A solar-powered fluidyne test bed was constructed and tested extensively. The test bed was composed of a fluidyne engine constructed from copper pipe and plastic tubing coupled with a Fresnel lens for concentrating solar energy. The test bed was instrumented with temperature, pressure, and position sensors. The concentrated solar energy from the Fresnel lens provided ample power to operate the test bed, and tests were run in a wide variety of conditions. Temperature, pressure, and volume phasing along with indicated work are presented and discussed for operation of the engine with no externally imposed load.

Jackson W. Mason; James W. Stevens

2014-01-01T23:59:59.000Z

394

Contraction scour in compound channels with cohesive soil beds  

E-Print Network [OSTI]

Bridge scour, which is the removal of bed materials from near the bridge foundations, is observed to be the most predominant cause of bridge failures in the United States. Scour in cohesive soils is greatly different from scour in cohesionless soils...

Israel Devadason, Benjamin Praisy

2008-10-10T23:59:59.000Z

395

Contraction scour in compound channels with cohesive soil beds  

E-Print Network [OSTI]

Bridge scour, which is the removal of bed materials from near the bridge foundations, is observed to be the most predominant cause of bridge failures in the United States. Scour in cohesive soils is greatly different from scour in cohesionless soils...

Israel Devadason, Benjamin Praisy

2009-05-15T23:59:59.000Z

396

Modular Pebble Bed Reactor High Temperature Gas Reactor  

E-Print Network [OSTI]

Modular Pebble Bed Reactor High Temperature Gas Reactor Andrew C Kadak Massachusetts Institute For 1150 MW Combined Heat and Power Station Oil Refinery Hydrogen Production Desalinization Plant VHTR/Graphite Discrimination system Damaged Sphere ContainerGraphiteReturn FuelReturn Fresh Fuel Container Spent Fuel Tank #12

397

The Design and Tests in a Three Interconnected Fluidized Bed  

Science Journals Connector (OSTI)

Hydrogen production based on chemical looping combustion can obtain clean hydrogen with near zero emission of carbon dioxide. This technique can be auto-thermal, making it very promising for hydrogen production. In this paper, the interconnected fluidized ... Keywords: chemical looping combustion, hydrogen production Interconnected fluidized beds

Junjiao Zhang; Jingzhou Jiang; Qiang Lu; Changqing Dong; Teng Zhang; Xinglei Liu; Zhiyong Liang; Yongping Yang

2010-12-01T23:59:59.000Z

398

DMEC-1 Pressurized Circulating Fluidized-Bed Demonstration Project  

SciTech Connect (OSTI)

The DMEC-1 project will demonstrate the use of Pyropower`s PYROFLOW pressurized circulating fluidized bed technology to repower an existing coal fired generating station. This will be the first commercial application of this technology in the world. The project is now in budget period 1, the preliminary design phase.

Kruempel, G.E.; Ambrose, S.J. [Midwest Power, Des Moines, IA (United States); Provol, S.J. [Pyropower Corp., San Diego, CA (United States)

1992-12-01T23:59:59.000Z

399

Model for boiling and dryout in particle beds. [LMFBR  

SciTech Connect (OSTI)

Over the last ten years experiments and modeling of dryout in particle beds have produced over fifty papers. Considering only volume-heated beds, over 250 dryout measurements have been made, and are listed in this work. In addition, fifteen models to predict dryout have been produced and are discussed. A model is developed in this report for one-dimensional boiling and dryout in a porous medium. It is based on conservation laws for mass, momentum, and energy. The initial coupled differential equations are reduced to a single first-order differential equation with an algebraic equation for the upper boundary condition. The model includes the effects of both laminar and turbulent flow, two-phase friction, and capillary force. The boundary condition at the bed bottom includes the possibility of inflowing liquid and either an adiabatic or a bottom-cooled support structure. The top of the bed may be either channeled or subcooled. In the first case the channel length and the saturation at the base of the channels are predicted. In the latter case, a criterion for penetration of the subcooled zone by channels is obtained.

Lipinski, R. J.

1982-06-01T23:59:59.000Z

400

Secular Sediment Waves, Channel Bed Waves, and Legacy Sediment  

E-Print Network [OSTI]

Secular Sediment Waves, Channel Bed Waves, and Legacy Sediment L. Allan James* Geography Department, University South Carolina Abstract The concept of sediment waves is reviewed and clarifications are proposed for nomenclature con- cerning vertical channel responses to large fluvial sediment fluxes over a period of a decade

James, L. Allan

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Isolated thermocouple amplifier system for stirred fixed-bed gasifier  

DOE Patents [OSTI]

A sensing system is provided for determining the bed temperature profile of the bed of a stirred, fixed-bed gasifier including a plurality of temperature sensors for sensing the bed temperature at different levels, a transmitter for transmitting data based on the outputs of the sensors to a remote operator's station, and a battery-based power supply. The system includes an isolation amplifier system comprising a plurality of isolation amplifier circuits for amplifying the outputs of the individual sensors. The isolation amplifier circuits each comprise an isolation operational amplifier connected to a sensor; a first "flying capacitor" circuit for, in operation, controlling the application of power from the power supply to the isolation amplifier; an output sample and hold circuit connected to the transmitter; a second "flying capacitor" circuit for, in operation, controlling the transfer of the output of the isolation amplifier to the sample and hold circuit; and a timing and control circuit for activating the first and second capacitor circuits in a predetermined timed sequence.

Fasching, George E. (Morgantown, WV)

1992-01-01T23:59:59.000Z

402

Moisture Transport in Silica Gel Packed Beds: II. Experimental Study  

SciTech Connect (OSTI)

Experiments have been performed to obtain the transient response of a thin adiabatic packed bed of silica gel after a step change in inlet air conditions, comparisons are made with predictions using a solid-side resistance model and a pseudo-gas-side controlled model and better agreement obtained with the former model.

Pesaran, A. A.; Mills, A. F.

1986-08-01T23:59:59.000Z

403

Modeling of Sediment Bed Behavior for Critical Velocity in Horizontal Piping  

SciTech Connect (OSTI)

This paper compares results from a predictive tool for modeling transport of a multiphase mixture (solids in a liquid) in a pipeline, (up to and including plugging) with experiments performed to support the Hanford site’s Waste Treatment and Immobilization Plant (WTP). The treatment of high-level waste at the DOE Office of River Protection’s WTP will involve the transfer of high solid content suspensions through pipelines. Pipeline plugging was identified as a significant potential issue by a panel of external experts. In response to their concerns an experimental effort was initiated at PNNL to determine the critical velocities for a variety of operating conditions. A computational method has been developed to predict the dynamic behavior of a sediment bed in response to the surrounding suspension flow. The flow field is modeled using a lattice kinetics method, similar to the lattice Boltzmann method, which scales very well on highly parallel computers. Turbulent quantities are calculated using a k-epsilon RANS model. This work is part of a larger effort to develop a process simulation capability for a wide range of applications. Solids are represented using two different continuum fields. The suspended solids are treated as passive scalars in the flow field, including terms for hindered settling and Brownian diffusion. Normal stresses created by the irreversible collisions of particles during shearing are added to the pressure tensor. The sediment bed interface is represented using a continuum phase field with a diffuse interface. The bed may change with time due to settling, erosion and deposition through convection. The erosion rates are calculated using the local shear stress obtained from the turbulence model. The method is compared with data from the PNNL pipeline experiments conducted at PNNL (Poloski et al. 2008). The experimental flow loop consists of 3-inch schedule 40 piping with instrumentation for determining flow rate and pressure gradient. The simulant test particles ranged in density from 2.5 to 8 g/cc while the nominal particle size ranged from 10 to 100 ?m. At the beginning of each test, the slurry flow velocity was nominally set to 8 ft/sec. The flow was incrementally ramped down, and a steady-state pressure gradient was obtained at each flow condition. A rise in pressure gradient as the flow rate drops indicates that the pipe cross-sectional area is beginning to fill with sediment. This point is referred to as the “critical velocity”. Visualization information is provided using Electrical Resistance Tomography (ERT). The paper will show favorable comparison of results with data.

Rector, David R.; Stewart, Mark L.; Poloski, Adam P.

2009-10-01T23:59:59.000Z

404

Fire spread probabilities for experimental beds composed of mixedwood boreal forest fuels  

E-Print Network [OSTI]

that fire spread was largely determined by the heat sink, heat of combustion, and fuel bed depth. We found

Johnson, Edward A.

405

Parametric Investigation of the Performance of Solar Heating Systems with Rock Bed Storage  

Science Journals Connector (OSTI)

The performance of solar air collector domestic heating systems with rock bed storage, as obtained from theoretical analysis, is...

W. L. Dutre; J. Vanheelen

1981-01-01T23:59:59.000Z

406

Gasification and its emission characteristics for dried sewage sludge utilizing a fluidized bed gasifier  

Science Journals Connector (OSTI)

The effects of these parameters were, therefore, investigated through a series of experiments with a fluidized bed gasifier.

Seong-Wan Kang; Jong-In Dong; Jong-Min Kim…

2011-10-01T23:59:59.000Z

407

An assessment of waste fuel burning in operating circulating fluidized bed boilers  

SciTech Connect (OSTI)

Fluidized bed combustion (FBC), today's fastest growing boiler technology, has the flexibility to burn a wide range of fuels, including many waste fuels, while satisfying all present and anticipated environmental regulations. The first generation of FBC--atmospheric fluidized bed combustion (AFBC)--concentrated on ''bubbling'' fluidized bed designs. These systems have inherent limitations and experienced several problems. In response to these problems, circulating fluidized bed (CFB) technology was developed.

Gendreau, R.J.; Raymond, D.L.

1986-01-01T23:59:59.000Z

408

Fluid-bed studies of olefin production from methanol  

SciTech Connect (OSTI)

With newly developed technology, conversion of methanol to hydrocarbons represents the final link in the production of premium transportation fuels from coal or natural gas. The methanol-to-gasoline (MTG) process has been developed. The more readily scaled fixed-bed version is the heart of the New Zealand Gas-to-gasoline complex, which will produce 14,000 BPD high octane gasoline from 120 million SCFD gas. The fluid-bed version of the process, which is also available for commercial license, has a higher thermal efficiency and possesses substantial yield and octane advantages over the fixed-bed. Successful scale-up was completed in 1984 in a 100 BPD semi-works plant near Cologne, West Germany. The project funded jointly by the U.S. and German governments and an industrial consortium comprised of Mobil; Union Rheinsche Braunkohlen Kraftstoff, AG; and Uhde, GmbH. The 100 BPD MTG project was extended recently to demonstrate a related fluid bed process for selective conversion of methanol to light olefins (MTO). The products of the MTO reaction make an excellent feed to the commercially available Mobile-Olefins-to-Gasoline-and-Distillate process (MOGD) which selectively converts olefins to premium transportation fuels . A schematic of the combined processes is shown. Total liquid fuels production is typically greater than 90 wt% of hydrocarbon in the feed. Distillate/gasoline product ratios from the plant can be adjusted over a wide range to meet seasonal demands. This paper describes the initial scale-up of the MTO process from a micro-fluid-bed reactor (1-10 grams of catalyst) to a large pilot unit (10-25 kilograms of catalyst).

Socha, R.F.; Chang, C.D.; Gould, R.M.; Kane, S.E.; Avidan, A.A.

1986-03-01T23:59:59.000Z

409

Atmospheric fluidized-bed combustion. Technology status report  

SciTech Connect (OSTI)

The goal of DOE/METC's AFBC activities is to establish an engineering technology base by 1990, from which the industrial, commercial, and residential sectors can build and operate coal-fired AFBC systems. These systems will be capable of economically generating process steam, direct and indirect heat, and onsite electric power from coals of all ranks and sulfur contents in an environmentally acceptable manner. First-generation atmospheric fluidized-bed technology is considered commercial; a number of US boiler manufacturers are offering commercial units. However, many of these first units are products of empirical design and offer marginal gains in economics, performance, and reliability over conventional systems. In order to resolve the remaining technical issues and to broaden the market, DOE is pursuing advanced concepts. Development of this second-generation AFBC technology is directed toward small industrial, commercial, and residential applications. Penetration of these potential markets will require: (1) a 20 to 30% reduction in capital and operating costs over first-generation technology; (2) significant improvements in performance and reliability; and (3) compliance with existing and proposed New Source Performance Standards for environmental emissions. Current AFBC activities address: industrial operations, advanced concepts, and technology development. Four AFBC demonstration projects were active in FY 1984. The development of AFBC technology is directly supported by the evaluation of five advanced concepts by the M.W. Kellogg Company (circulating-bed FBC), Battelle Columbus Laboratories (spouted-bed FBC), Aerojet Energy Conversion Company (moving-bed FBC), Howard University (staged cascade FBC), and Arthur D. Little, Inc. (pulsed-bed FBC). These concepts may improve the economics and performance. 13 refs., 11 figs.

Not Available

1984-10-01T23:59:59.000Z

410

Great lakes fluidized-bed combustion. Final report  

SciTech Connect (OSTI)

A program was conducted to design, construct, and operate an industrial fluidized bed combustion (FBC) boiler demonstration plant with a capacity of 50,000 lb/h steam. The following were the objectives of the program: (1) to extend the fluidized bed boiler design by employing natural circulation cooling; (2) to design, build, operate, test, and demonstrate a fluidized bed boiler that could burn high sulfur coal in an environmentally acceptable manner; and (3) to obtain sufficient data for industry to make an objective appraisal of fluidized bed coal burning boilers. Following a five-year design, development, and construction effort, the demonstration plant was first operated in June of 1981. Initial operation identified several equipment and operating problems, particularly in the areas of the fuel preparation and fuel feed systems. Unit operation and availability steadily improved, culminating in a 30-day continuous run ending in May 1982. Following shutdown, major problem areas such as bed tube failures were addressed by C-E and rectified prior to the start of the test program. Shakedown/testing operation commenced on August 12, 1983. The objectives for the test program were to establish the unit operating conditions required to optimize SO/sub 2/ removal and combustion efficiency for different operating modes, and to evaluate the long-term performance of components which are essential for reliable FBC operation. A total of 23 tests were run from February 16, 1984 to April 19, 1984. The test results demonstrated that FBC is an environmentally and commercially sound technology. Specificially, the required sulfur removal, low NO/sub x//CO emissions and high combustion efficiencies can be readily achieved. This report identifies the effects of recycle, excess air, Ca/S mole ratio, and overfire air on combustion efficiency, boiler efficiency, and emissions. 6 refs., 97 figs., 8 tabs.

Not Available

1985-12-01T23:59:59.000Z

411

On interfacial instability as a cause of transverse subcritical bed Jeremy G. Venditti,1  

E-Print Network [OSTI]

On interfacial instability as a cause of transverse subcritical bed forms Jeremy G. Venditti,1. J. Bennett (2006), On interfacial instability as a cause of transverse subcritical bed forms, Water, 1997]. Ideas about the initiation of the dominant subcritical flow-transverse bed forms (ripples, dunes

Venditti, Jeremy G.

412

Biomass Gasification:? Produced Gas Upgrading by In-Bed Use of Dolomite  

Science Journals Connector (OSTI)

When some calcined dolomite (OCa·OMg) is used in the bed of a biomass gasifier of fluidized bed type the raw gas produced is cleaner than when only silica sand is used in it as fluidizing medium. In-bed dolomite changes the product distribution at the ...

Ana Olivares; María P. Aznar; Miguel A. Caballero; Javier Gil; Eva Francés; José Corella

1997-12-01T23:59:59.000Z

413

EXPERIMENTAL MEASUREMENTS OF THE INTERFACE THERMAL CONDUCTANCE OF A LITHIUM METATITANATE PEBBLE BED  

E-Print Network [OSTI]

, CA 90095 aliabousena@engineering.ucla.edu The thermal properties of the lithium ceramics pebble beds will help to create a reliable database of the thermal properties of the lithium ceramics pebble beds. I heat is transferred from the hot lithium ceramic pebble beds to the coolant. The thermal properties

Abdou, Mohamed

414

The Nature of Saltation and of 'Bed-Load' Transport in Water  

Science Journals Connector (OSTI)

...transported by a stream and a 'bed-load' has long remained undefined...light on the nature of bed-load transport. In particular, it has been shown that bed-load transport, by saltation, occurs...in the existing experimental data. The theoretical variation is...

1973-01-01T23:59:59.000Z

415

Evidence for detrital remanent magnetization carried by hematite in Devonian red beds from Spitsbergen; palaeomagnetic implications  

Science Journals Connector (OSTI)

......Regional bedding of the Wood say Formation red beds (136/8) and...composed of disintegrated red sandstones from Dicksonfjorden...titanomaghemite withm red bed deposits indicates...emphasized that the Wood Bay Forma- tion sandstone...Digico balanced flux-gate spinner, a single......

R. Løvlie; T. Torsvik; M. Jelenska; M. Levandowski

1984-11-01T23:59:59.000Z

416

Emergent Behavior in a Low-Order Fluidized-Bed Bubble Model  

E-Print Network [OSTI]

Emergent Behavior in a Low-Order Fluidized-Bed Bubble Model John S. Halow National Energy of this type of model to describe the dynamics of voids in bubbling fluidized beds. The model considers vertical interactions between neighboring bubbles in fluidized beds. Emergent collective behavior is shown

Tennessee, University of

417

Modeling forced poolriffle hydraulics in a boulder-bed stream, southern California  

E-Print Network [OSTI]

Modeling forced pool­riffle hydraulics in a boulder-bed stream, southern California Lee R. Harrison in boulder-bed channels. Here, we use a high-resolution two-dimensional flow model to investigate­riffle sequence in a boulder-bed stream. Model output indicates that at low discharge, a peak zone of shear stress

Keller, Ed

418

WindTurbineGenerator Introduction of the Renewable Micro-Grid Test-Bed  

E-Print Network [OSTI]

Introduction of the Renewable Micro-Grid Test-Bed Dr. Wenxin Liu Smart Micro-grid and Renewable Technology University Topology of the Overall Experimental Platform Photo of the Micro-grid Test-bed Overview of the Micro-grid Test-Bed Cubicle #1: Main & PV Simulator PV Simulator: 3kW, 0~200V, 18A Unidirectional

Johnson, Eric E.

419

Worldwide Occurrences of Arsenic in Ground Water  

Science Journals Connector (OSTI)

...decision-making process of water managers, remediation specialists, and...The geologic and ground-water conditions that promote...water managers, remediation specialists, and...The geologic and ground-water conditions that promote...

D. Kirk Nordstrom

2002-06-21T23:59:59.000Z

420

Montana Ground Water Assessment Act (Montana)  

Broader source: Energy.gov [DOE]

This statute establishes a program to systematically assess and monitor the state's ground water and to disseminate the information to interested persons in order to improve the quality of ground...

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Warm or Steaming Ground | Open Energy Information  

Open Energy Info (EERE)

Warm or Steaming Ground Warm or Steaming Ground Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Warm or Steaming Ground Dictionary.png Warm or Steaming Ground: An area where geothermal heat is conducted to the earth's surface, warming the ground and sometimes causing steam to form when water is present. Other definitions:Wikipedia Reegle Modern Geothermal Features Typical list of modern geothermal features Hot Springs Fumaroles Warm or Steaming Ground Mudpots, Mud Pools, or Mud Volcanoes Geysers Blind Geothermal System Steam rising from the ground at Eldvorp, a 10 km row of craters, in Southwestern Iceland. http://www.visiticeland.com/SearchResults/Attraction/eldvorp Warm or steaming ground is often an indicator of a geothermal system beneath the surface. In some cases a geothermal system may not show any

422

Gnome-Coach, New Mexico Site Fact Sheet  

SciTech Connect (OSTI)

The Gnome-Coach Site is located in southern Eddy County, New Mexico, 11 miles east of the Pecos River and 25 miles southeast of the city of Carlsbad. The site is approximately 680 acres. The land is currently withdrawn from all forms of disposition under the public land laws, including U.S. mining laws and leasing under mineral leasing laws. On December 10, 1961, a 3-kiloton-yield nuclear device was detonated at a depth of 1,183 feet belowground surface in a thick, bedded salt deposit within the Salado Formation.

None

2009-04-27T23:59:59.000Z

423

Ground Source Heat Pump Demonstration Projects  

Broader source: Energy.gov [DOE]

Below are the project presentations and respective peer review results for Ground Source Heat Pump Demonstration Projects.

424

Ground Source Heat Pump Subprogram Overview  

Broader source: Energy.gov [DOE]

This overview of GTP's Ground Source Heat Pump subprogram was given at GTP's Program Peer Review on May 18, 2010.

425

North Village Ground Source Heat Pumps  

Broader source: Energy.gov [DOE]

Overview: Installation of Ground Source Heat Pumps. Replacement of Aging Heat Pumps. Alignment with Furmans Sustainability Goals.

426

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS | Department  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS Aiken, SC - Construction of a key cleanup facility at the Savannah River Site (SRS) is gaining some serious ground given the remarkable building progress since Fall 2009. Construction and operation of the Salt Waste Processing Facility (SWPF) is among the U.S. Department of Energy's (DOE) highest cleanup priorities. When operational, SWPF will treat millions of gallons of salt waste currently stored in 49 underground tanks at SRS by removing radioactive constituents for vitrification at the nearby Defense Waste Processing Facility. Disposition of the salt waste inventory is a

427

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS | Department  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS Aiken, SC - Construction of a key cleanup facility at the Savannah River Site (SRS) is gaining some serious ground given the remarkable building progress since Fall 2009. Construction and operation of the Salt Waste Processing Facility (SWPF) is among the U.S. Department of Energy's (DOE) highest cleanup priorities. When operational, SWPF will treat millions of gallons of salt waste currently stored in 49 underground tanks at SRS by removing radioactive constituents for vitrification at the nearby Defense Waste Processing Facility. Disposition of the salt waste inventory is a

428

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) |  

Open Energy Info (EERE)

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal

429

GRR/Section 14-CO-e - Ground Water Discharge Permit | Open Energy  

Open Energy Info (EERE)

CO-e - Ground Water Discharge Permit CO-e - Ground Water Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CO-e - Ground Water Discharge Permit 14COEGroundWaterDischargePermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Water Quality Control Act 5 CCR 1002-61 Colorado Discharge Permit System 5 CCR 1002-41 Basic Standards for Ground Water 5 CCR 1002-42 Site Specific Water Quality Standards for Ground Water Triggers None specified Click "Edit With Form" above to add content 14COEGroundWaterDischargePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

430

Stability of ice-sheet grounding lines  

Science Journals Connector (OSTI)

...81 73 Stability of ice-sheet grounding lines Richard F. Katz 1 * M. Grae Worster 2...ice sheets are sensitive to grounding-line position and variation, characteristics...models. We present a theory for grounding-line dynamics in three spatial dimensions and...

2010-01-01T23:59:59.000Z

431

Hydraulic testing of Salado Formation evaporites at the Waste Isolation Pilot Plant site: Second interpretive report  

SciTech Connect (OSTI)

Pressure-pulse, constant-pressure flow, and pressure-buildup tests have been performed in bedded evaporites of the Salado Formation at the Waste Isolation Pilot Plant (WIPP) site to evaluate the hydraulic properties controlling brine flow through the Salado. Transmissivities have been interpreted from six sequences of tests conducted on five stratigraphic intervals within 15 m of the WIPP underground excavations.

Beauheim, R.L. [Sandia National Labs., Albuquerque, NM (United States); Roberts, R.M.; Dale, T.F.; Fort, M.D.; Stensrud, W.A. [INTERA, Inc., Austin, TX (United States)

1993-12-01T23:59:59.000Z

432

Basics of pump-and-treat ground-water remediation technology. Special report  

SciTech Connect (OSTI)

The pump-and-treat process, whereby contaminated ground water is pumped to the surface for treatment, is one of the most common ground-water remediation technologies used at hazardous waste sites. However, recent research has identified complex chemical and physical interactions between contaminants and the subsurface media which may impose limitations on the extraction part of the process. The report was developed to summarize the basic considerations necessary to determine when, where, and how pump-and-treat technology can be used effectively to remediate ground-water contamination.

Mercer, J.W.; Skipp, D.C.; Giffin, D.

1990-03-01T23:59:59.000Z

433

Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 2, Appendices: Final environmental impact statement  

SciTech Connect (OSTI)

This volume contains Appendix F--hydrology report, and Appendix G--flood plain and wetland assessment. Contents of the hydrology report include: surface water; ground water; potentially affected hydrogeologic environment-processing site; potentially affected hydrogeologic environment-Cheney reservoir site; potentially affected hydrogeologic environment-Two Road site; and conclusions-ground water.

none,

1986-12-01T23:59:59.000Z

434

Fluidized-Bed Waste-Heat Recovery System development. Semiannual report, February 1-July 31, 1982  

SciTech Connect (OSTI)

The Fluidized-Bed Waste-Heat Recovery (FBWHR) System is designed to preheat this combustion air using the heat available in dirty flue gas streams. In this system, a recirculating medium is heated by the flue gas in a fluidized bed. The hot medium is then removed from the bed and placed in a second fluidized bed where it is fluidized by the combustion air. Through this process, the combustion air is heated. The cooled medium is then returned to the first bed. Initial development of this concept is for the aluminum smelting industry.

Cole, W. E.; DeSaro, R.; Griffith, J.; Joshi, C.

1982-08-01T23:59:59.000Z

435

Characterization of Solid Emissions from Atmospheric Fluidized-Bed Combustion of Two Czech Lignites  

Science Journals Connector (OSTI)

In fluidized-bed combustion, particles of coal burn within the bed of vigorously moving smaller inert particles with bed temperatures between 1000 and 1300 K. Due to intense heat transfer from the burning particle to bed particles and percolating gas, the temperature of a particle is on average 200 K above that of the bed (29, 30). ... Two lignites from the Centrum mine and the Vršany open pit mine (North Bohemian Coal Basin) were used in this study. ... The reactor is equipped with a supplementary natural gas burner, a feeding system, and measuring and control peripherals. ...

Ji?í Smolík; Jaroslav Schwarz; Václav Veselý; Ivana Sýkorová; Jan Kuc?era; Vladimír Havránek

1999-09-01T23:59:59.000Z

436

Atlas SCT/Pixel Grounding and Shielding ATLAS SCT/Pixel Grounding and Shielding Note  

E-Print Network [OSTI]

Atlas SCT/Pixel Grounding and Shielding 1 ATLAS SCT/Pixel Grounding and Shielding Note November 22 mostly connects existing mechanical electrical conductive #12; Atlas SCT/Pixel Grounding and Shielding 2 that equivalent. The barrel outer heat shield (150 aluminum) main element shield. #12; Atlas SCT/Pixel Grounding

California at Santa Cruz, University of

437

P ORNiiTM-7004 Results of Ground Level Radiation  

Office of Legacy Management (LM)

ORNiiTM-7004 ORNiiTM-7004 Results of Ground Level Radiation Measurements in Support of the 1978 Aerial Survey of the Lake Ontario Ordnance W o rks, Lewiston, New York _ ict~~.. By A, grven _, ,_~ ~.~ _,. :::;(' ~. . ' -- .- ,. R. W . Doane F. F. Haywood W . H. Shinpaugh ORNL/TM-7004 Dist. Category UC-41 Contract No. W-7405eng-26 RESULTS OF GROUND LEVEL RADIATION MEASUREMENTS IN SUPPORT OF THE 1978 AERIAL SURVEY OF THE LAKE ONTARIO ORDNANCE WORKS, LEWISTON, NEW YORK B. A. Berven F. F. Haywood R. W. Doane W. H. Shinpaugh Work performed by Health and Safety Research Division Date Published: September 1979 Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites -

438

Engine ground demonstration test approach  

SciTech Connect (OSTI)

The hardware portion of the current phase of the Integrated Solar Upper Stage (ISUS) program culminates in a system ground demonstration test. The potential application of ISUS technology to a wide array of future missions complicates the process of selecting from among demonstration system design options and test approaches. The approach to this system demonstration has been to maximize system technology readiness level for the entire array of potential missions within the constraints of the program. To this end, system design and test operations planning has been carried out with a premium on demonstrating those elements of the system common to all missions. In addition, test planning has been managed to allow margin for testing those portions of the system envelope needed to confirm acceptable operation for scenarios within the mission set that are specific to a given mission or mission type. Examples drawn from the specific Engine Ground Demonstration (EGD) design selections are used to illuminate this approach, with the result that the EGD system design is not only described, but the reasons for its particular characteristics are made evident.

Kudija, C.T. [Rockwell Aerospace, Canoga Park, CA (United States). Rocketdyne Div.

1996-12-31T23:59:59.000Z

439

Simulation of a High Efficiency Multi-bed Adsorption Heat Pump  

SciTech Connect (OSTI)

Attaining high energy efficiency with adsorption heat pumps is challenging due to thermodynamic losses that occur when the sorbent beds are thermally cycled without effective heat recuperation. The multi-bed concept described here effectively transfers heat from beds being cooled to beds being heated, which enables high efficiency in thermally driven heat pumps. A simplified lumped-parameter model and detailed finite element analysis are used to simulate the performance of an ammonia-carbon sorption compressor, which is used to project the overall heat pump coefficient of performance. The effects of bed geometry and number of beds on system performance are explored, and the majority of the performance benefit is obtained with four beds. Results indicate that a COP of 1.24 based on heat input is feasible at AHRI standard test conditions for residential HVAC equipment. When compared on a basis of primary energy input, performance equivalent to SEER 13 or 14 are theoretically attainable with this system.

TeGrotenhuis, Ward E.; Humble, Paul H.; Sweeney, J. B.

2012-05-01T23:59:59.000Z

440

Small Site Closures  

Office of Environmental Management (EM)

CO 1997 Old Rifle, CO 1997 Slick Rock Old North Continent, CO 1997 Slick Rock Union Carbide, CO 1997 New Brunswick Site, NJ 1997 List of Small Site Closures by Year 2 Site Name,...

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Waste  

Broader source: Energy.gov (indexed) [DOE]

Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Waste Harmless Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Waste Harmless April 2, 2012 - 12:00pm Addthis Neil Smith puts a trained eye on the pressure and flow of a food-grade com¬pound being injected into an under¬ground plume of hazardous waste near the X-720 Maintenance Facility at the DOE Piketon Site. The sodium lactate compound promotes bacterial growth in the groundwater that turns hazardous waste into harmless end-products. Neil Smith puts a trained eye on the pressure and flow of a food-grade com¬pound being injected into an under¬ground plume of hazardous waste near the X-720 Maintenance Facility at the DOE Piketon Site. The sodium lactate compound promotes bacterial growth in the groundwater that turns

442

Grate assembly for fixed-bed coal gasifier  

DOE Patents [OSTI]

A grate assembly for a coal gasifier of a moving-bed or fixed-bed type is provided for crushing agglomerates of solid material such as clinkers, tailoring the radial distribution of reactant gases entering the gasification reaction zone, and control of the radial distribution of downwardly moving solid velocities in the gasification and combustion zone. The clinker crushing is provided by pinching clinkers between vertically oriented stationary bars and angled bars supported on the upper surface of a rotating conical grate. The distribution of the reactant gases is provided by the selective positioning of horizontally oriented passageways extending through the grate. The radial distribution of the solids is provided by mounting a vertically and generally radially extending scoop mechanism on the upper surface of the grate near the apex thereof.

Notestein, John E. (Morgantown, WV)

1993-01-01T23:59:59.000Z

443

Adsorbent and adsorbent bed for materials capture and separation processes  

DOE Patents [OSTI]

A method device and material for performing adsorption wherein a fluid mixture is passed through a channel in a structured adsorbent bed having a solid adsorbent comprised of adsorbent particles having a general diameter less than 100 um, loaded in a porous support matrix defining at least one straight flow channel. The adsorbent bed is configured to allow passage of a fluid through said channel and diffusion of a target material into said adsorbent under a pressure gradient driving force. The targeted molecular species in the fluid mixture diffuses across the porous support retaining layer, contacts the adsorbent, and adsorbs on the adsorbent, while the remaining species in the fluid mixture flows out of the channel.

Liu, Wei (Richland, WA)

2011-01-25T23:59:59.000Z

444

Controlled waste-oil biodegradation at existing drying beds  

SciTech Connect (OSTI)

A feasibility study at the Portsmouth Uranium Enrichment Facility to determine if sludge drying beds at a sewage treatment plant could be used as controlled waste oil biodegradation plots has been completed. A greenhouse-like enclosure would be constructed over three 9.1 meter by 21.3 meter beds to allow for year-round use, and any waste oil runoff would be collected by existing leachate piping. It has been determined that this proposed facility could dispose of existing radioactive waste oil generation (7200 liters/year) from the Gaseous Diffusion Plant (GDP); however, it would be inadequate to handle radioactive waste oils from the new Gas Centrifuge Enrichment Plant (GCEP) as well. The study reviewed nuclear criticality constraints, biodegradation technology, and the capital cost for an enclosed biodegradation facility.

Hary, L.F.

1982-01-01T23:59:59.000Z

445

A future for nuclear energy: pebble bed reactors  

Science Journals Connector (OSTI)

Pebble Bed Reactors could allow nuclear plants to support the goal of reducing global climate change in an energy hungry world. They are small, modular, inherently safe, use a demonstrated nuclear technology and can be competitive with fossil fuels. Pebble bed reactors are helium cooled reactors that use small tennis ball size fuel balls consisting of only 9 grams of uranium per pebble to provide a low power density reactor. The low power density and large graphite core provide inherent safety features such that the peak temperature reached even under the complete loss of coolant accident without any active emergency core cooling system is significantly below the temperature that the fuel melts. This feature should enhance public confidence in this nuclear technology. With advanced modularity principles, it is expected that this type of design and assembly could lower the cost of new nuclear plants removing a major impediment to deployment.

Andrew C. Kadak

2005-01-01T23:59:59.000Z

446

A free radical equilibrium in the fluidized bed retort  

SciTech Connect (OSTI)

The solid-recycle fluidized bed retort has been used to study gas phase local equilibria in an oil shale pyrolyzer. In the LLNL pilot scale retort, light gases, methane, ethane, ethylene, and propylene, form in a ratio that is inconsistent with equilibration, and they are not equilibrated when recycled. However, in a variety of fluidized bed retorting experiments, the free radical precursors of these gases come to a steady state that requires a transient free radical equilibrium. The steady state is established very rapidly, without need for gas recycle. The 1- and 2-butyl free radicals have been investigated as representative intermediates. The steady state mechanism extends to the entire homologous series of free radicals, and offers a means to achieve improved liquid product yield. 12 refs., 4 figs., 2 tabs.

Coburn, T.T.; Droege, M.W.

1986-11-01T23:59:59.000Z

447

Fluidized bed combustor and removable windbox and tube assembly therefor  

DOE Patents [OSTI]

A fluidized bed combustor comprises a housing having a chamber therein with a top having a discharge for the gases which are generated in the chamber and a bottom with a discharge for heated fluid. An assembly is arranged in the lower portion of the chamber and the assembly includes a lower plate which is mounted on a support flange of the housing so that it is spaced from the bottom of the chamber and defines a fluid plenum between it and the bottom of the chamber for the discharge of heated fluid. The assembly includes a heat exchanger inlet plenum having tubes therethrough for the passage of fluidizer air and a windbox above the heat exchanger plenum which has a distributor plate top wall. A portion of the chamber above the top wall defines a fluidized bed.

DeFeo, Angelo (Totowa, NJ); Hosek, William (Mt. Tabor, NJ)

1983-01-01T23:59:59.000Z

448

Fluidized bed combustor and removable windbox and tube assembly therefor  

DOE Patents [OSTI]

A fluidized bed combustor comprises a housing having a chamber therein with a top having a discharge for the gases which are generated in the chamber and a bottom with a discharge for heated fluid. An assembly is arranged in the lower portion of the chamber and the assembly includes a lower plate which is mounted on a support flange of the housing so that it is spaced from the bottom of the chamber and defines a fluid plenum between it and the bottom of the chamber for the discharge of heated fluid. The assembly includes a heat exchanger inlet plenum having tubes therethrough for the passage of fluidizer air and a windbox above the heat exchanger plenum which has a distributor plate top wall. A portion of the chamber above the top wall defines a fluidized bed.

DeFeo, Angelo (Totowa, NJ); Hosek, William S. (Mt. Tabor, NJ)

1981-01-01T23:59:59.000Z

449

Fluidized bed gasification ash reduction and removal process  

DOE Patents [OSTI]

In a fluidized bed gasification system an ash removal system to reduce the particulate ash to a maximum size or smaller, allow the ash to cool to a temperature lower than the gasifier and remove the ash from the gasifier system. The system consists of a crusher, a container containing level probes and a means for controlling the rotational speed of the crusher based on the level of ash within the container.

Schenone, Carl E. (Madison, PA); Rosinski, Joseph (Vanderbilt, PA)

1984-12-04T23:59:59.000Z

450

Fluidized bed gasification ash reduction and removal system  

DOE Patents [OSTI]

In a fluidized bed gasification system an ash removal system to reduce the particulate ash to a maximum size or smaller, allow the ash to cool to a temperature lower than the gasifier and remove the ash from the gasifier system. The system consists of a crusher, a container containing level probes and a means for controlling the rotational speed of the crusher based on the level of ash within the container.

Schenone, Carl E. (Madison, PA); Rosinski, Joseph (Vanderbilt, PA)

1984-02-28T23:59:59.000Z

451

Inclined fluidized bed system for drying fine coal  

DOE Patents [OSTI]

Coal is processed in an inclined fluidized bed dryer operated in a plug-flow manner with zonal temperature and composition control, and an inert fluidizing gas, such as carbon dioxide or combustion gas. Recycled carbon dioxide, which is used for drying, pyrolysis, quenching, and cooling, is produced by partial decarboxylation of the coal. The coal is heated sufficiently to mobilize coal tar by further pyrolysis, which seals micropores upon quenching. Further cooling with carbon dioxide enhances stabilization.

Cha, Chang Y. (Golden, CO); Merriam, Norman W. (Laramie, WY); Boysen, John E. (Laramie, WY)

1992-02-11T23:59:59.000Z

452

Four Rivers second generation Pressurized Circulating Fluidized Bed Combustion Project  

SciTech Connect (OSTI)

Air Products has been selected in the DOE Clean Coal Technology Round V program to build, own, and operate the first commercial power plant using second generation Pressurized Circulating Fluidized Bed (PCFB) combustion technology. The four Rivers Energy Project (Four Rivers) will produce up to 400,000 lb/hr steam, or an equivalent gross capacity of 95 MWe. The unit will be used to repower an Air Products chemicals manufacturing facility in Calvert City, Kentucky.

Holley, E.P.; Lewnard, J.J. [Air Products and Chemicals, Inc. (United States); von Wedel, G. [LLB Lurgi Lentjes Babcock Energietechnik (GmbH); Richardson, K.W. [Foster Wheeler Energy Corp. (United States); Morehead, H.T. [Westinghouse Electric Corp. (United States)

1995-04-01T23:59:59.000Z

453

Biological control of Rhizoctonia solani in greenhouse bedding plant production  

E-Print Network [OSTI]

of Comm!ttee) (Robert E. Pettit) (Member) (David id. Reed) (Member) "7~+ (Grant Yest) (Head of. Depart tment) Deceriber 1983 ABSTRACT Biological control of Rhizoctonia solani in greenhouse bedding plant production. IDecember 1983) John... iviichael Brown B. S, East Texas State University. Chairman of Advisory Committee: Dr . A . E . Nightingale . Isolates of Trichoderma harzianum, T. hamatum, and Gliocladium spp. capable of inhibiting the growth of Rhizoctonia solani, which may cause...

Brown, John Michael

1983-01-01T23:59:59.000Z

454

Pulsed atmospheric fluidized bed combustor apparatus and process  

DOE Patents [OSTI]

A pulsed atmospheric fluidized bed reactor system is disclosed and claimed along with a process for utilization of same for the combustion of, e.g. high sulfur content coal. The system affords a economical, ecologically acceptable alternative to oil and gas fired combustors. The apparatus may also be employed for endothermic reaction, combustion of waste products, e.g. organic and medical waste, drying, calcining and the like.

Mansour, Momtaz N. (Columbia, MD)

1992-01-01T23:59:59.000Z

455

Hanford Site Freedom  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2007; 3. Radionuclide Air Emissions Report for the Hanford Site, Calendar Year 2008; 4. Radionuclide Air Emissions Report for the Hanford Site, Calendar Year 2010. (The 2009...

456

Optimal Design of Grounding System for HV / EHV Substations in Two Layered Soil  

E-Print Network [OSTI]

Abstract — Successful operation of entire power system depends to a considerable extent on efficient and satisfactory performance of substations. Hence substations in general can be considered as heart of overall power system. In any substation, a well designed grounding plays an important role. Since absence of safe and effective grounding system can result in mal-operation or non-operation of control and protective devices, grounding system design deserves considerable attention for all the substations. Grounding system has to be safe as it is directly concerned with safety of persons working within the substation. Main purpose of this work is designing safe and cost effective grounding systems for HV / EHV substations situated at such locations where soil of the substation site is not uniform. Here soil is considered to be horizontally stratified into two layers. Initially significance of two layered soil model is introduced and design methodology for design of substation grounding system is discussed. Next, two design problems have been solved by using newly developed software and results obtained here are verified with the help of Ground Grid Systems module of ETAP – professional software. Comparison of the results obtained by both the software shows nice agreement of the results given by ESGSD with those obtained from ETAP. Hence this software is found to be quite satisfactory tool in the field of design of grounding system for HV / EHV substations.

unknown authors

457

Method for immobilizing particulate materials in a packed bed  

DOE Patents [OSTI]

The present invention pertains generally to immobilizing particulate matter contained in a "packed" bed reactor so as to prevent powder migration, compaction, coalescence, or the like. More specifically, this invention relates to a technique for immobilizing particulate materials using a microporous foam-like polymer such that a) the particulate retains its essential chemical nature, b) the local movement of the particulate particles is not unduly restricted, c) bulk powder migration and is prevented, d) physical and chemical access to the particulate is unchanged over time, and e) very high particulate densities are achieved. The immobilized bed of the present invention comprises a vessel for holding particulate matter, inlet and an outlet ports or fittings, a loosely packed bed of particulate material contained within the vessel, and a three dimensional porous matrix for surrounding and confining the particles thereby fixing the movement of individual particle to a limited local position. The established matrix is composed of a series of cells or chambers comprising walls surrounding void space, each wall forming the wall of an adjacent cell; each wall containing many holes penetrating through the wall yielding an overall porous structure and allowing useful levels of gas transport.

Even, Jr., William R. (Livermore, CA); Guthrie, Stephen E. (Livermore, CA); Raber, Thomas N. (Livermore, CA); Wally, Karl (Lafayette, CA); Whinnery, LeRoy L. (Livermore, CA); Zifer, Thomas (Manteca, CA)

1999-01-01T23:59:59.000Z

458

Fluidized-bed gasification of an eastern oil shale  

SciTech Connect (OSTI)

The current conceptual HYTORT process design for the hydroretorting of oil shales employs moving-bed retorts that utilize shale particles larger than 3 mm. Work at the Institute of Gas Technology (IGT) is in progress to investigate the potential of high-temperature (1100 to 1300 K) fluidized-bed gasification of shale fines (<3 mm size) using steam and oxygen as a technique for more complete utilization of the resource. Synthesis gas produced from fines gasification can be used for making some of the hydrogen needed in the HYTORT process. After completing laboratory-scale batch and continuous gasification tests with several Eastern oil shales, two tests with Indiana New Albany shale were conducted in a 0.2 m diameter fluidized-bed gasification process development unit (PDU). A conceptual gasifier design for 95% carbon conversion was completed. Gasification of 20% of the mined shale can produce the hydrogen required by the HYTORT reactor to retort 80% of the remaining shale. 12 refs., 1 fig., 5 tabs.

Lau, F.S.; Rue, D.M.; Punwani, D.V.; Rex, R.C. Jr.

1987-01-01T23:59:59.000Z

459

Conductivity tracer studies for a fluidized-bed bioreactor  

SciTech Connect (OSTI)

An automated conductivity tracer test was developed to measure the residence time distribution (RTD) of a cometabolic fluidized-bed bioreactor (FBBR). The FBBR contained sand-core bioparticles grown with phenol and it provided high (70% to 80%) removal of trichloroethene (TCE) at short (3 minute) detention times. The tracer test apparatus was constructed with off-the-shelf components controlled with a PC-based data acquisition system. Non-disruptive hydrodynamic testing was obtained during normal operation of the FBBR. The conductivity of injected brine pulses was monitored at the reactor inlet and outlet. Dispersion numbers and detention times were computed by fitting the advection-dispersion model to the tracer curves. Typical dispersion numbers attributed to the fluidized-bed of bioparticles ranged from 0.07 to 0.11. In simplified modeling of the FBBR, dispersion was found to have little effect on TCE removal. Based on the dispersion of brine pulses, it was determined that phenol feed pulses injected at inhibitory concentrations over 2 g/L would be rapidly dispersed in the biological bed to non-inhibitory concentrations.

Leung, S.Y.; Segar, R.L. Jr. [Univ. of Missouri, Columbia, MO (United States). Dept. of Civil Engineering

1997-12-31T23:59:59.000Z

460

Treatment of trichloroethene (TCE) with a fluidized-bed bioreactor  

SciTech Connect (OSTI)

Fluidized-bed bioreactors (FBBR`s) offer a promising alternative to existing treatment technologies for the treatment of water contaminated with chlorinated solvents. The objective of this research was to test a laboratory-scale FBBR for removal of trichloroethene (TCE) from groundwater and to study the FBBR kinetic behavior so that field-scale treatment systems could be designed. Phenol was selected as the growth substrate for biofilm-forming microorganisms enriched from activated-sludge because phenol induces enzymes capable of cometabolizing TCE and lesser chlorinated ethenes. The biofilm forming microorganisms were identified as Pseudomonas putida, a common soil bacterium. Experiments with a conventional, single-pass FBBR addressed TCE removal as effected by changes in TCE loading, phenol loading, and media type. In this study, TCE removal using quartz filter sand and garnet filter sand as the biofilm attachment media was measured. Removal ranged from 20 to 60% and was not affected by the media type. Also, removal was not affected by inlet TCE concentration over the range of 100 to 500 {micro}g/L provided the phenol loading was decreased with increasing TCE loading. The FBBR was capable of complete phenol removal at an inlet concentration of 20 to 25 mg/L and an empty-bed contact time of 2.7 minutes. However, the empty-bed contact time was insufficient to sustain greater than 40 to 50% removal of TCE in a nutrient-amended groundwater.

Foeller, J.R.; Segar, R.L. Jr. [Univ. of Missouri, Columbia, MO (United States). Dept. of Civil Engineering

1997-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Evaluation of Bare Ground on Rangelands using Unmanned Aerial Vehicles  

SciTech Connect (OSTI)

Attention is currently being given to methods that assess the ecological condition of rangelands throughout the United States. There are a number of different indicators that assess ecological condition of rangelands. Bare Ground is being considered by a number of agencies and resource specialists as a lead indicator that can be evaluated over a broad area. Traditional methods of measuring bare ground rely on field technicians collecting data along a line transect or from a plot. Unmanned aerial vehicles (UAVs) provide an alternative to collecting field data, can monitor a large area in a relative short period of time, and in many cases can enhance safety and time required to collect data. In this study, both fixed wing and helicopter UAVs were used to measure bare ground in a sagebrush steppe ecosystem. The data were collected with digital imagery and read using the image analysis software SamplePoint. The approach was tested over seven different plots and compared against traditional field methods to evaluate accuracy for assessing bare ground. The field plots were located on the Idaho National Laboratory (INL) site west of Idaho Falls, Idaho in locations where there is very little disturbance by humans and the area is grazed only by wildlife. The comparison of fixed-wing and helicopter UAV technology against field estimates shows good agreement for the measurement of bare ground. This study shows that if a high degree of detail and data accuracy is desired, then a helicopter UAV may be a good platform. If the data collection objective is to assess broad-scale landscape level changes, then the collection of imagery with a fixed-wing system is probably more appropriate.

Robert P. Breckenridge; Maxine Dakins

2011-01-01T23:59:59.000Z

462

Assessment of adsorber bed designs in waste-heat driven adsorption cooling systems for vehicle air conditioning and refrigeration  

E-Print Network [OSTI]

Assessment of adsorber bed designs in waste-heat driven adsorption cooling systems for vehicle air conditioning Finned tube adsorber bed Specific cooling power Adsorber bed to adsorbent mass ratio a b s t r a c t Adsorber bed design strongly affects the performance of waste-heat driven adsorption cooling systems (ACS

Bahrami, Majid

463

Reply to comment by Claude Michel on ``A general power equation for predicting bed load transport rates in gravel  

E-Print Network [OSTI]

Reply to comment by Claude Michel on ``A general power equation for predicting bed load transport Michel on ``A general power equation for predicting bed load transport rates in gravel bed rivers of our transport equation. [2] Although some bed load transport data exhibit non- linear trends in log

464

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network [OSTI]

..........................................................................................................................................5 9.0 Ground- and Surface-Water MonitoringCSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TASK PLAN TABLE OF CONTENTS 1 .............................................................................................5 FIGURES #12;CSMRI Site Remediation Task Plan March 31, 2004 TASK PLAN CSMRI SITE REMEDIATION 1

465

SIGNIFICANT NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

E-Print Network [OSTI]

SIGNIFICANT NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE to assess the ecological values of the Rock Creek drainage at the Rocky Flats Environmental Technology Site from existing data at the Rocky Flats Environmental Technology Site. 2.Perform ground surveys to rank

466

Performance Characteristics of Fluidized Bed Syngas Methanation over Ni-Mg/Al2O3 Catalyst  

Science Journals Connector (OSTI)

Abstract The performance characteristics of isothermal fluidized bed syngas methanation for substitute natural gas is investigated over a self-made Ni-Mg/Al2O3 catalyst. Via atmospheric methanation in a laboratory fluidized bed reactor it was clarified that the CO conversion varied in 5% when changing the space velocity in 40-120 L · g- 1 · h- 1 but the conversion increased obviously by raising the superficial gas velocity from 4 to 12.4 cm · s- 1. The temperature 823 K is suitable for syngas methanation while obvious deposition of uneasy-oxidizing C? occurs on the catalyst at temperatures around 873 K. From kinetic aspect, the lowest reaction temperature is suggested to be 750 K when the space velocity is 60 L · g- 1 · h- 1. Raising the H2/CO ratio of the syngas increased proportionally the CO conversion and CH4 selectivity, showing that at enough high H2/CO ratios the active sites on the catalyst are sufficient for CO adsorption and in turn the reaction with H2 for forming CH4. Introducing CO2 into the syngas feed increased H2 consumption but suppressed water gas shift and Boudouard reactions. The ratio of CO2/CO in syngas should be better below 0.52 because varying the ratio from 0.52 to 0.92 resulted in negligible increases in the H2 conversion and CH4 selectivity but decreased the CH4 yield. Introducing steam into the feed gas affected little the CO conversion but decreased the selectivity to CH4. The tested Ni-Mg/Al2O3 catalyst manifested good stability in structure and activity even in syngas containing water vapor.

Jiao Liu; Dianmiao Cui; Jian Yu; Fabing Su; Guangwen Xu

2014-01-01T23:59:59.000Z

467

Schematic designs for penetration seals for a reference repository in bedded salt  

SciTech Connect (OSTI)

The isolation of radioactive wastes in geologic repositories requires that man-made penetrations such as shafts, tunnels, or boreholes are adequately sealed. This report describes schematic seal designs for a repository in bedded salt referenced to the straitigraphy of southeastern New Mexico. The designs are presented for extensive peer review and will be updated as site-specific conceptual designs when a site for a repository in salt has been selected. The principal material used in the seal system is crushed salt obtained from excavating the repository. It is anticipated that crushed salt will consolidate as the repository rooms creep close to the degree that mechanical and hydrologic properties will eventually match those of undisturbed, intact salt. For southeastern New Mexico salt, analyses indicate that this process will require approximately 1000 years for a seal located at the base of one of the repository shafts (where there is little increase in temperature due to waste emplacement) and approximately 400 years for a seal located in an access tunnel within the repository. Bulkheads composed of contrete or salt bricks are also included in the seal system as components which will have low permeability during the period required for salt consolidation.

Kelsall, P.C.; Case, J.B.; Meyer, D.; Coons, W.E.

1982-11-01T23:59:59.000Z

468

Performance of the Fluidized Bed Steam Reforming Product Under Hydraulically Unsaturated Conditions  

SciTech Connect (OSTI)

Currently, several candidates for secondary waste immobilization at the Hanford site in the State of Washington, USA are being considered. To demonstrate the durability of the product in the unsaturated Integrated Disposal Facility (IDF) at the site, a series of tests have been performed one of the candidate materials using the Pressurized Unsaturated Flow (PUF) system. The material that was tested was the Fluidized Bed Steam Reformer (FBSR) granular product and the granular product encapsulated in a geopolymer matrix. The FBSR product is composed primarily of an insoluble sodium aluminosilicate matrix with the dominant phases being feldspathoid minerals mostly nepheline, sodalite, and nosean. The PUF test method allows for the accelerated weathering of materials, including radioactive waste forms, under hydraulically unsaturated conditions, thus mimicking the open-flow and transport properties that most likely will be present at the IDF. The experiments show a trend of decreasing tracer release as a function of time for several of the elements released from the material including Na, Si, Al, and Cs. However, some of the elements, notably I and Re, show a steady release throughout the yearlong test. This result suggests that the release of these minerals from the sodalite cage occurs at a different rate compared with the dissolution of the predominant nepheline phase.

Neeway, James J.; Qafoku, Nikolla; Williams, Benjamin D.; Rod, Kenton A.; Bowden, Mark E.; Brown, Christopher F.; Pierce, Eric M.

2014-05-01T23:59:59.000Z

469

Surfactants for ground water remediation  

Science Journals Connector (OSTI)

Ground water contamination is a most intractable form of pollution. Spilled solvent or fuel liquids are trapped below the water table by colloidal forces. Surfactants may be used to dramatically improve contaminated aquifer remediation rates. Principal remediation mechanisms include micellar solubilization and mobilization of the trapped liquids by lowering of the oil/water interfacial tension. Surfactant selection is a key to the successful design of a remediation effort, and involves consideration of factors including Krafft Point, surfactant adsorption onto the aquifer solids, and the phase behavior of the oil/water/surfactant system. Successful field demonstrations have occurred in recent months and the technology is moving rapidly toward commercialization. Critical research issues remain including acceptable clean-up levels, surfactant/contaminant in situ biodegradation rates, and surfactant decontamination and reuse.

Jeffrey H. Harwell; David A. Sabatini; R.C. Knox

1999-01-01T23:59:59.000Z

470

1 -SUBTIDAL 2 -INTERTIDAL RB ROCK UB UNCONSOLIDATED AB AQUATIC BED RF -REEF OW -OPEN WATER/ AB AQUATIC BED RF REEF RS ROCKY SHORE US -UNCONSOLIDATED  

E-Print Network [OSTI]

M - MARINE 1 - SUBTIDAL 2 - INTERTIDAL RB ­ ROCK UB ­ UNCONSOLIDATED AB ­ AQUATIC BED RF - REEF OW - OPEN WATER/ AB ­ AQUATIC BED RF­ REEF RS ­ ROCKY SHORE US - UNCONSOLIDATED BOTTOM BOTTOM Unknown Bottom ­ UNCONSOLIDATED AB ­ AQUATIC RF ­ REEF OW - OPEN WATER/ AB ­ AQUATIC RF­ REEF SB ­ STREAMBED RS - ROCKY US

Gray, Matthew

471

DEVELOPMENT OF PRESSURIZED CIRCULATING FLUIDIZED BED PARTIAL GASIFICATION MODULE (PGM)  

SciTech Connect (OSTI)

Foster Wheeler Development Corporation is working under DOE contract No. DE-FC26-00NT40972 to develop a partial gasification module (PGM) that represents a critical element of several potential coal-fired Vision 21 plants. When utilized for electrical power generation, these plants will operate with efficiencies greater than 60% while producing near zero emissions of traditional stack gas pollutants. The new process partially gasifies coal at elevated pressure producing a coal-derived syngas and a char residue. The syngas can be used to fuel the most advanced power producing equipment such as solid oxide fuel cells or gas turbines or processed to produce clean liquid fuels or chemicals for industrial users. The char residue is not wasted; it can also be used to generate electricity by fueling boilers that drive the most advanced ultra-supercritical pressure steam turbines. The unique aspect of the process is that it utilizes a pressurized circulating fluidized bed partial gasifier and does not attempt to consume the coal in a single step. To convert all the coal to syngas in a single step requires extremely high temperatures ({approx}2500 to 2800F) that melt and vaporize the coal and essentially drive all coal ash contaminants into the syngas. Since these contaminants can be corrosive to power generating equipment, the syngas must be cooled to near room temperature to enable a series of chemical processes to clean the syngas. Foster Wheeler's process operates at much lower temperatures that control/minimize the release of contaminants; this eliminates/minimizes the need for the expensive, complicated syngas heat exchangers and chemical cleanup systems typical of high temperature gasification. By performing the gasification in a circulating bed, a significant amount of syngas can still be produced despite the reduced temperature and the circulating bed allows easy scale up to large size plants. Rather than air, it can also operate with oxygen to facilitate sequestration of stack gas carbon dioxide gases for a 100% reduction in greenhouse gas emissions. The amount of syngas and char produced by the PGM can be tailored to fit the production objectives of the overall plant, i.e., power generation, clean liquid fuel production, chemicals production, etc. Hence, PGM is a robust building block that offers all the advantages of coal gasification but in a more user friendly form; it is also fuel flexible in that it can use alternative fuels such as biomass, sewerage sludge, etc. The PGM consists of a pressurized circulating fluidized bed (PCFB) reactor together with a recycle cyclone and a particulate removing barrier filter. Coal, air, steam, and possibly sand are fed to the bottom of the PCFB reactor and establish a relatively dense bed of coal/char in the bottom section. As these constituents react, a hot syngas is produced which conveys the solids residue vertically up through the reactor and into the recycle cyclone. Solids elutriated from the dense bed and contained in the syngas are collected in the cyclone and drain via a dipleg back to the dense bed at the bottom of the PCFB reactor. This recycle loop of hot solids acts as a thermal flywheel and promotes efficient solid-gas chemical reaction.

Unknown

2001-07-10T23:59:59.000Z

472

Erosion of heat exchanger tubes in fluidized beds. Annual report, 1990  

SciTech Connect (OSTI)

This final report describes the activities of the 3-year project entitled ``Erosion of Heat Exchanger Tubes In Fluidized Beds.`` which was completed at the end of 1990. Project accomplishments include the collection of a substantial body of wear data In a 24in. {times} 24in. fluidized bed, comparative wear results In a 6in. {times} 6in. fluidized bed, the development of a dragometer and the collection of a comprehensive set of drag force data in the 24in. {times} 24in. bed, Fast Fourier Transform (FFT) analysis of bubble probe data to establish dominant bubble frequencies in the 24in. {times} 24in. bed, the use of a heat flux gauge for measurement of heat transfer coefficients in the 24in. {times} 24in. bed and the modeling of the tube wear in the 24in. {times} 24in. bed. Analysis of the wear data from the 24in. square bed indicates that tube wear increases with increase in superficial velocity, and with increase in tube height. The latter effect is a result of the tubes higher up in the bed seeing greater movement of dense phase than tubes lower down In the bed. In addition, tube wear was found to decrease with increase in particle size, for constant superficial velocity. Three models of tube wear were formulated and provided acceptable prediction of wear when compared with the experimental data.

Johnson, E.K.; Flemmer, R.L.C.

1991-01-01T23:59:59.000Z

473

Superfund record of decision (EPA Region 3): H and H Burn Pit Superfund Site, Hanover County, VA, June 30, 1995  

SciTech Connect (OSTI)

This Record of Decision (ROD) presents the final remedial action selected for the HH Burn Pit Superfund Site, located in Hanover County, Virginia (Site). This remedy addresses contaminated soil, sediment, surface water, and ground water at the Site. The Site has been identified using different names in many of the documents in the Administrative Record and on the National Priorities List. This Record of Decision will refer to the Site as the `HH Burn Pit Superfund Site.`

NONE

1995-07-01T23:59:59.000Z

474

Hanford Site Solid Waste Acceptance Program - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About Us > Hanford Site Wide Programs > Hanford Site Solid Waste Acceptance Program About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Hanford Site...

475

Hydrogeology of the 200 Areas low-level burial grounds: An interim report: Volume 1, Text  

SciTech Connect (OSTI)

This report presents information derived from the installation of 35 ground-water monitoring wells around six low-level radioactive/hazardous waste burial grounds located in the 200 Areas of the Hanford Site in southeastern Washington State. This information was collected between May 20, 1987 and August 1, 1988. The contents of this report have been divided into two volumes. This volume contains the main text. Volume 2 contains the appendixes, including data and supporting information that verify content and results found in the main text. This report documents information collected by the Pacific Northwest Laboratory at the request of Westinghouse Hanford Company. Presented in this report are the preliminary interpretations of the hydrogeologic environment of six low-level burial grounds, which comprise four waste management areas (WMAs) located in the 200 Areas of the Hanford Site. This information and its accompanying interpretations were derived from sampling and testing activities associated with the construction of 35 ground-water monitoring wells as well as a multitude of previously existing boreholes. The new monitoring wells were installed as part of a ground-water monitoring program initiated in 1986. This ground-water monitoring program is based on requirements for interim status facilities in compliance with the Resource Conservation and Recovery Act (1976).

Last, G.V.; Bjornstad, B.N.; Bergeron, M.P.; Wallace, D.W.; Newcomer, D.R.; Schramke, J.A.; Chamness, M.A.; Cline, C.S.; Airhart, S.P.; Wilbur, J.S.

1989-01-01T23:59:59.000Z

476

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

E-Print Network [OSTI]

gen-set A1, utility connected Test a single line-to-groundgen-set B1, utility connected Test a single line-to-groundsets (A1+B1), utility connected Test a single line-to-ground

Eto, Joseph H.

2008-01-01T23:59:59.000Z

477

Ground Electromagnetic Techniques | Open Energy Information  

Open Energy Info (EERE)

Ground Electromagnetic Techniques Ground Electromagnetic Techniques (Redirected from Ground Electromagnetic Methods) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Electromagnetic Techniques Details Activities (0) Areas (0) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Electrical Techniques Parent Exploration Technique: Electromagnetic Techniques Information Provided by Technique Lithology: Rock composition, mineral and clay content Stratigraphic/Structural: Detection of permeable pathways, fracture zones, faults Hydrological: Resistivity influenced by porosity, grain size distribution, permeability, fluid saturation, fluid type and phase state of the pore water Thermal: Resistivity influenced by temperature

478

Earth resistivity measurement near substation ground grids  

SciTech Connect (OSTI)

Proper substation grounding grid design requires good, accurate soil resistivity measurements. This data is essential to model the substation ground grid to design a safe ground grid with a satisfactory ground grid resistance at minimum cost. For substations with several decades of service, there is some concern that a grid may have deteriorated, been damaged during equipment installation or excavation, or that initial soil resistivity measurements were lost or may not have been correctly performed. Ground grid conductors change the substation surface voltage distribution. Any voltage measurements taken at the complete substation will also vary from the tests made without conductors present. During testing, current was injected in the soil by probes placed near the ground grid. The current tends to follow the ground grid conductors since copper is a far better conductor than the soil it is placed in. Resistance readings near grids will be lower than readings in undisturbed soil. Since computer models were unavailable for many years, analyzing the effect of the grid conductors on soil resistivity measurements was very difficult. As a result, soil resistivity measurements made close to substations were of little use to the engineer unless some means of correcting the measured values could be developed. This paper will present results of soil resistivity measurements near a substation ground grid before and after a ground grid has been installed and describes a means of calculating the undisturbed soil model.

Lodwig, S.G.; Mateja, S.A. [ComEd, Chicago, IL (United States)

1996-11-01T23:59:59.000Z

479

Design of AC substation grounding system.  

E-Print Network [OSTI]

??The purpose for this paper is to understand the basic foundation used to safely design a substation grounding system for AC systems. The following criteria… (more)

Meas, Ra

2014-01-01T23:59:59.000Z

480

White House budget to ground SOFIA  

Science Journals Connector (OSTI)

... in to make up the difference, the cuts would ground the aeroplane, a modified Boeing 747 that carries a 2.5-metre telescope. ...

Alexandra Witze

2014-03-04T23:59:59.000Z

Note: This page contains sample records for the topic "ground bed site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.