Powered by Deep Web Technologies
Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

A High Frequency Isolated Current-fed Bidirectional DC/AC Converter For Grid-Tied Energy Storage System  

E-Print Network (OSTI)

AC Converter for Grid-tied Energy Storage System Xiaolei Hu,resources, grid-tied energy storage systems voltage to abe increasingly incorporated. Energy storage devices allows

King Jet, Tseng

2013-01-01T23:59:59.000Z

2

Partially Shaded Operation of a Grid-Tied PV System: Preprint  

SciTech Connect

This paper presents background and experimental results from a single-string grid-tied PV system, operated under a variety of shading conditions.

Deline, C.

2009-06-01T23:59:59.000Z

3

Utility-scale grid-tied PV inverter reliability workshop summary report.  

DOE Green Energy (OSTI)

A key to the long-term success of the photovoltaic (PV) industry is confidence in the reliability of PV systems. Inverters are the most commonly noted cause of PV system incidents triggered in the field. While not all of these incidents are reliability-related or even necessarily failures, they still result in a loss of generated power. With support from the U.S. Department of Energy's Solar Energy Technologies Program, Sandia National Laboratories organized a Utility-Scale Grid-Tied Inverter Reliability Workshop in Albuquerque, New Mexico, January 27-28, 2011. The workshop addressed the reliability of large (100-kilowatt+) grid-tied inverters and the implications when such inverters fail, evaluated inverter codes and standards, and provided discussion about opportunities to enhance inverter reliability. This report summarizes discussions and presentations from the workshop and identifies opportunities for future efforts.

Granata, Jennifer E.; Quintana, Michael A.; Tasca, Coryne Adelle (SRA International, Inc., Fairfax, VA); Atcitty, Stanley

2011-07-01T23:59:59.000Z

4

Utility-scale grid-tied PV inverter reliability workshop summary report.  

SciTech Connect

A key to the long-term success of the photovoltaic (PV) industry is confidence in the reliability of PV systems. Inverters are the most commonly noted cause of PV system incidents triggered in the field. While not all of these incidents are reliability-related or even necessarily failures, they still result in a loss of generated power. With support from the U.S. Department of Energy's Solar Energy Technologies Program, Sandia National Laboratories organized a Utility-Scale Grid-Tied Inverter Reliability Workshop in Albuquerque, New Mexico, January 27-28, 2011. The workshop addressed the reliability of large (100-kilowatt+) grid-tied inverters and the implications when such inverters fail, evaluated inverter codes and standards, and provided discussion about opportunities to enhance inverter reliability. This report summarizes discussions and presentations from the workshop and identifies opportunities for future efforts.

Granata, Jennifer E.; Quintana, Michael A.; Tasca, Coryne Adelle (SRA International, Inc., Fairfax, VA); Atcitty, Stanley

2011-07-01T23:59:59.000Z

5

Using super capacitors to interface a small wind turbine to a grid-tied micro-inverter.  

E-Print Network (OSTI)

??During the development of an educational renewable energy production platform, it was found that there were no low-cost, efficient grid-tie interfaces for a 160 W… (more)

Eldridge, Christopher Sean

2011-01-01T23:59:59.000Z

6

Market Assessment of Residential Grid-Tied PV Systems in Colorado  

DOE Green Energy (OSTI)

This report presents research done in response to a decision by the Colorado Governor's Office of Energy Conservation and Management (OEC) and Colorado utility companies to consider making residential grid-tied photovoltaic (PV) systems available in Colorado. The idea was to locate homeowners willing to pay the costs of grid-tied PV (GPV) systems without batteries-$8,000 or $12,000 for a 2- or 3-kilowatt (kW) system, respectively, in 1996. These costs represented two-thirds of the actual installed cost of $6 per watt at that time and assumed the remainder would be subsidized. The National Renewable Energy Laboratory (NREL) and OEC partnered to conduct a market assessment for GPV technology in Colorado. The study encompassed both qualitative and quantitative phases. The market assessment concluded that a market for residential GPV systems exists in Colorado today. That market is substantial enough for companies to successfully market PV systems to Colorado homeowners. These homeo wners appear ready to learn more, inform themselves, and actively purchase GPV systems. The present situation is highly advantageous to Colorado's institutions-primarily its state government and its utility companies, and also its homebuilders-if they are ready to move forward on GPV technology.

Farhar, B.; Coburn, T.

2000-09-29T23:59:59.000Z

7

A Market Assessment of Residential Grid-Tied PV Systems in Colorado: Executive Summary  

DOE Green Energy (OSTI)

This is the Executive Summary of a report that presents research done in response to a decision by the Colorado Governor's Office of Energy Conservation and Management (OEC) and Colorado utility companies to consider making residential grid-tied photovoltaic (PV) systems available in Colorado. The idea was to locate homeowners willing to pay the costs of grid-tied PV (GPV) systems without batteries--$8,000 or $12,000 for a 2- or 3-kilowatt (kW) system, respectively, in 1996. These costs represented two-thirds of the actual installed cost of $6 per watt at that time and assumed the remainder would be subsidized. The National Renewable Energy Laboratory (NREL) and OEC partnered to conduct a market assessment for GPV technology in Colorado. The study encompassed both qualitative and quantitative phases. The market assessment concluded that a market for residential GPV systems exists in Colorado today. That market is substantial enough for companies to successfully market PV systems to Colorado homeowners. These homeowners appear ready to learn more, inform themselves, and actively purchase GPV systems. The present situation is highly advantageous to Colorado's institutions--primarily its state government and its utility companies, and also its homebuilders--if they are ready to move forward on GPV technology.

Farhar, B.; Coburn, T.

2000-09-13T23:59:59.000Z

8

Market Assessment of Residential Grid-Tied PV Systems in Colorado  

SciTech Connect

This report presents research done in response to a decision by the Colorado Governor's Office of Energy Conservation and Management (OEC) and Colorado utility companies to consider making residential grid-tied photovoltaic (PV) systems available in Colorado. The idea was to locate homeowners willing to pay the costs of grid-tied PV (GPV) systems without batteries-$8,000 or $12,000 for a 2- or 3-kilowatt (kW) system, respectively, in 1996. These costs represented two-thirds of the actual installed cost of $6 per watt at that time and assumed the remainder would be subsidized. The National Renewable Energy Laboratory (NREL) and OEC partnered to conduct a market assessment for GPV technology in Colorado. The study encompassed both qualitative and quantitative phases. The market assessment concluded that a market for residential GPV systems exists in Colorado today. That market is substantial enough for companies to successfully market PV systems to Colorado homeowners. These homeo wners appear ready to learn more, inform themselves, and actively purchase GPV systems. The present situation is highly advantageous to Colorado's institutions-primarily its state government and its utility companies, and also its homebuilders-if they are ready to move forward on GPV technology.

Farhar, B.; Coburn, T.

2000-09-29T23:59:59.000Z

9

Public Response to Residential Grid-Tied PV Systems in Colorado: A Qualitative Market Assessment  

DOE Green Energy (OSTI)

The early adopters of residential grid-tied photovoltaics (PV) have complex motivations to pay today's costs, including altruistic, environmental, and financial reasons. Focused interviews were conducted with a self-selected purposive sample interested in purchasing 2-kW or 3-kW PV systems with an installed cost of $8,000 to $12,000. The sample tended to be men or married couples ranging in age from their early thirties to their mid-eighties; professionals, managers, or small business owners; relatively financially secure, with experience with energy efficiency and renewable energy. Product attributes they preferred were net metering, warranties, guarantees, utility financing, maintenance, an option to own or lease, a battery option, and an aesthetically pleasing system. Potential PV customers needed more information before making a purchase decision.

Farhar, B. C.; Buhrmann, J.

1998-07-01T23:59:59.000Z

10

Batteries for stationary standby and cycling applications :Part 5: maintenance and testing standards.  

Science Conference Proceedings (OSTI)

The existing IEEE stationary battery maintenance and testing standards fall into two basic categories: those associated with grid-tied standby applications and those associated with stand-alone photovoltaic cycling applications. These applications differ in several significant ways, which in turn influence their associated standards. A review of the factors influencing the maintenance and testing of stationary battery systems provides the reasons for the differences between these standards and some of the hazards of using a standard inappropriate to the application. This review also provides a background on why these standards will need to be supplemented in the future to support emerging requirements of other applications, such as grid-tied cycling and photovoltaic hybrid applications.

Chamberlin, Jay L.

2003-01-01T23:59:59.000Z

11

Batteries for stationary standby and cycling applications. Part 5, Maintenance and testing standards.  

Science Conference Proceedings (OSTI)

The existing IEEE stationary battery maintenance and testing standards fall into two basic categories: those associated with grid-tied standby applications and those associated with stand-alone photovoltaic cycling applications. These applications differ in several significant ways, which in turn influence their associated standards. A review of the factors influencing the maintenance and testing of stationary battery systems provides the reasons for the differences between these standards and some of the hazards of using a standard inappropriate to the application. This review also provides a background on why these standards will need to be supplemented in the future to support emerging requirements of other applications, such as grid-tied cycling and photovoltaic hybrid applications.

Chamberlin, Jay L.

2003-06-01T23:59:59.000Z

12

Award Application and Requirements (PDF)  

Science Conference Proceedings (OSTI)

Zip/Postal Code: Country: Telephone Number: E-mail: Supervisor's Name: DIVISION AFFILIATION: (Choose one if applicable.) EMPMD EPD LMD MPMD SMD.

13

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

14

Application Filing Requirements for Natural Gas Pipeline Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin) Application Filing Requirements for Natural Gas Pipeline Construction Projects...

15

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

16

Future of Grid-Tied PV Business Models: What Will Happen When PV Penetration on the Distribution Grid is Significant? Preprint  

DOE Green Energy (OSTI)

Eventually, distributed PV will become a more significant part of the generation mix. When this happens, it is expected that utilities will have to take on a more active role in the placement, operation and control of these systems. There are operational complexities and concerns of revenue erosion that will drive utilities into greater involvement of distributed PV and will create new business models. This report summarizes work done by Navigant Consulting Inc. for the National Renewable Energy Laboratory as part of the Department of Energy's work on Renewable System Integration. The objective of the work was to better understand the structure of these future business models and the research, development and demonstration (RD&D) required to support their deployment. This report describes potential future PV business models in terms of combinations of utility ownership and control of the PV assets, and the various relationships between end-users and third-party owners.

Graham, S.; Katofsky, R.; Frantzis, L.; Sawyer, H.; Margolis, R.

2008-05-01T23:59:59.000Z

17

Application Filing Requirements for Natural Gas Pipeline Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Savings Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin) Application Filing Requirements for Natural Gas...

18

Industrial Requirements and Applications of Hard Magnetic Materials  

Science Conference Proceedings (OSTI)

Presentation Title, Industrial Requirements and Applications of Hard Magnetic Materials ... Bonded Magnetocaloric Powders for the Refrigeration Application.

19

Applications of Cermets to Meet Operational Waste Package Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Operational Waste Package Requirements Applications of Cermets to Meet Operational Waste Package Requirements The cermet could meet three operational requirements for the waste...

20

Data requirements for intermediate energy nuclear applications  

SciTech Connect

Several applications that include spallation neutron sources, space radiation effects, biomedical isotope production, accelerator shielding and radiation therapy make use of intermediate energy nuclear data extending to several GeV. The overlapping data needs of these applications are discussed in terms of what projectiles, targets and reactions are of interest. Included is a discussion of what is generally known about these data and what is needed to facilitate their use in intermediate energy applications. 40 refs., 2 figs., 2 tabs.

Pearlstein, S.

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Application Filing Requirements for Wind-Powered Electric Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind-Powered Electric Generation Facilities (Ohio) Application Filing Requirements for Wind-Powered Electric Generation Facilities (Ohio) Eligibility Commercial Developer Utility...

22

Application Filling Requirements for Transmission Line and Substation...  

Open Energy Info (EERE)

icon Twitter icon Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) This is the approved revision of this page, as...

23

Application Filing Requirements for Wind-Powered Electric Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filing Requirements for Wind-Powered Electric Application Filing Requirements for Wind-Powered Electric Generation Facilities (Ohio) Application Filing Requirements for Wind-Powered Electric Generation Facilities (Ohio) < Back Eligibility Commercial Developer Utility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Savings Category Wind Buying & Making Electricity Program Info State Ohio Program Type Siting and Permitting Provider Ohio Power Siting Board Chapter 4906-17 of the Ohio Administrative Code states the Application Filing Requirements for wind-powered electric generating facilities in Ohio. The information requested in this rule shall be used to assess the environmental effects of the proposed facility. An applicant for a certificate to site a wind-powered electric generation

24

Application Filling Requirements for Transmission Line and Substation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Wind Solar Program Info

25

Application Filing Requirements for Natural Gas Pipeline Construction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin) Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Wisconsin Program Type Siting and Permitting Any utility proposing to construct a natural gas pipeline requiring a Certificate of Authority (CA) under Wis. Stat. §196.49 must prepare an

26

PREPARING FOR EXASCALE: ORNL Leadership Computing Application Requirements and Strategy  

SciTech Connect

In 2009 the Oak Ridge Leadership Computing Facility (OLCF), a U.S. Department of Energy (DOE) facility at the Oak Ridge National Laboratory (ORNL) National Center for Computational Sciences (NCCS), elicited petascale computational science requirements from leading computational scientists in the international science community. This effort targeted science teams whose projects received large computer allocation awards on OLCF systems. A clear finding of this process was that in order to reach their science goals over the next several years, multiple projects will require computational resources in excess of an order of magnitude more powerful than those currently available. Additionally, for the longer term, next-generation science will require computing platforms of exascale capability in order to reach DOE science objectives over the next decade. It is generally recognized that achieving exascale in the proposed time frame will require disruptive changes in computer hardware and software. Processor hardware will become necessarily heterogeneous and will include accelerator technologies. Software must undergo the concomitant changes needed to extract the available performance from this heterogeneous hardware. This disruption portends to be substantial, not unlike the change to the message passing paradigm in the computational science community over 20 years ago. Since technological disruptions take time to assimilate, we must aggressively embark on this course of change now, to insure that science applications and their underlying programming models are mature and ready when exascale computing arrives. This includes initiation of application readiness efforts to adapt existing codes to heterogeneous architectures, support of relevant software tools, and procurement of next-generation hardware testbeds for porting and testing codes. The 2009 OLCF requirements process identified numerous actions necessary to meet this challenge: (1) Hardware capabilities must be advanced on multiple fronts, including peak flops, node memory capacity, interconnect latency, interconnect bandwidth, and memory bandwidth. (2) Effective parallel programming interfaces must be developed to exploit the power of emerging hardware. (3) Science application teams must now begin to adapt and reformulate application codes to the new hardware and software, typified by hierarchical and disparate layers of compute, memory and concurrency. (4) Algorithm research must be realigned to exploit this hierarchy. (5) When possible, mathematical libraries must be used to encapsulate the required operations in an efficient and useful way. (6) Software tools must be developed to make the new hardware more usable. (7) Science application software must be improved to cope with the increasing complexity of computing systems. (8) Data management efforts must be readied for the larger quantities of data generated by larger, more accurate science models. Requirements elicitation, analysis, validation, and management comprise a difficult and inexact process, particularly in periods of technological change. Nonetheless, the OLCF requirements modeling process is becoming increasingly quantitative and actionable, as the process becomes more developed and mature, and the process this year has identified clear and concrete steps to be taken. This report discloses (1) the fundamental science case driving the need for the next generation of computer hardware, (2) application usage trends that illustrate the science need, (3) application performance characteristics that drive the need for increased hardware capabilities, (4) resource and process requirements that make the development and deployment of science applications on next-generation hardware successful, and (5) summary recommendations for the required next steps within the computer and computational science communities.

Joubert, Wayne [ORNL; Kothe, Douglas B [ORNL; Nam, Hai Ah [ORNL

2009-12-01T23:59:59.000Z

27

Results of Sandia National Laboratories grid-tied inverter testing  

SciTech Connect

This paper proposes a definition for a Non-Islanding Inverter. This paper also presents methods that can be used to implement such an inverter, along with references to prior work on the subject. Justification for the definition is provided on both a theoretical basis and results from tests conducted at Sandia National Laboratories and Ascension Technology, Inc.

Kern, G.A. [Ascension Technology, Inc., Boulder, CO (United States); Bonn, R.H.; Ginn, J.; Gonzalez, S. [Sandia National Labs., Albuquerque, NM (United States)

1998-07-01T23:59:59.000Z

28

Scientific Application Requirements for Leadership Computing at the Exascale  

Science Conference Proceedings (OSTI)

The Department of Energy s Leadership Computing Facility, located at Oak Ridge National Laboratory s National Center for Computational Sciences, recently polled scientific teams that had large allocations at the center in 2007, asking them to identify computational science requirements for future exascale systems (capable of an exaflop, or 1018 floating point operations per second). These requirements are necessarily speculative, since an exascale system will not be realized until the 2015 2020 timeframe, and are expressed where possible relative to a recent petascale requirements analysis of similar science applications [1]. Our initial findings, which beg further data collection, validation, and analysis, did in fact align with many of our expectations and existing petascale requirements, yet they also contained some surprises, complete with new challenges and opportunities. First and foremost, the breadth and depth of science prospects and benefits on an exascale computing system are striking. Without a doubt, they justify a large investment, even with its inherent risks. The possibilities for return on investment (by any measure) are too large to let us ignore this opportunity. The software opportunities and challenges are enormous. In fact, as one notable computational scientist put it, the scale of questions being asked at the exascale is tremendous and the hardware has gotten way ahead of the software. We are in grave danger of failing because of a software crisis unless concerted investments and coordinating activities are undertaken to reduce and close this hardwaresoftware gap over the next decade. Key to success will be a rigorous requirement for natural mapping of algorithms to hardware in a way that complements (rather than competes with) compilers and runtime systems. The level of abstraction must be raised, and more attention must be paid to functionalities and capabilities that incorporate intent into data structures, are aware of memory hierarchy, possess fault tolerance, exploit asynchronism, and are power-consumption aware. On the other hand, we must also provide application scientists with the ability to develop software without having to become experts in the computer science components. Numerical algorithms are scattered broadly across science domains, with no one particular algorithm being ubiquitous and no one algorithm going unused. Structured grids and dense linear algebra continue to dominate, but other algorithm categories will become more common. A significant increase is projected for Monte Carlo algorithms, unstructured grids, sparse linear algebra, and particle methods, and a relative decrease foreseen in fast Fourier transforms. These projections reflect the expectation of much higher architecture concurrency and the resulting need for very high scalability. The new algorithm categories that application scientists expect to be increasingly important in the next decade include adaptive mesh refinement, implicit nonlinear systems, data assimilation, agent-based methods, parameter continuation, and optimization. The attributes of leadership computing systems expected to increase most in priority over the next decade are (in order of importance) interconnect bandwidth, memory bandwidth, mean time to interrupt, memory latency, and interconnect latency. The attributes expected to decrease most in relative priority are disk latency, archival storage capacity, disk bandwidth, wide area network bandwidth, and local storage capacity. These choices by application developers reflect the expected needs of applications or the expected reality of available hardware. One interpretation is that the increasing priorities reflect the desire to increase computational efficiency to take advantage of increasing peak flops [floating point operations per second], while the decreasing priorities reflect the expectation that computational efficiency will not increase. Per-core requirements appear to be relatively static, while aggregate requirements will grow with the system. This projection is consistent with a r

Ahern, Sean [ORNL; Alam, Sadaf R [ORNL; Fahey, Mark R [ORNL; Hartman-Baker, Rebecca J [ORNL; Barrett, Richard F [ORNL; Kendall, Ricky A [ORNL; Kothe, Douglas B [ORNL; Mills, Richard T [ORNL; Sankaran, Ramanan [ORNL; Tharrington, Arnold N [ORNL; White III, James B [ORNL

2007-12-01T23:59:59.000Z

29

Application of NEPA requirements to CERCLA remedial actions. Master's thesis  

Science Conference Proceedings (OSTI)

This study investigated the application of National Environmental Policy Act (NEPA) requirements to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) actions. Similarities in the documentation and public participation requirements of NEPA and CERCLA include identification and evaluation of alternatives and public participation. Differences include document contents and timing of public participation. This study presented four options for ensuring NEPA compliance at CERCLA sites. Option one included a Programmatic Environmental Impact Statement (PEIS) with subsequent combined FS/EIS report for each subunit. Option two eliminated the PEIS, but retained a stand-alone NEPA document for each CERCLA subunit. Option three included a PEIS with a subsequent combined FS/EIS report for each subunit. Option four eliminated the PEIS but retained a combined FS/EIS report for each subunit. The model presented in this study can be used at any installation to determine the optimal approach for the site. The model's goal is to comply with NEPA and CERCLA while maintaining a balance between cost, schedule, and public acceptance.

Strobbe, C.L.

1994-06-01T23:59:59.000Z

30

Initial Requirements for Wireless Sensors in Power Plant Applications  

Science Conference Proceedings (OSTI)

This EPRI technical update report is a product of an effort to examine the suitability of certain wireless technology for deployment in a power plant environment. Specifically, the report details some of the initial processes involved in gathering requirements for wireless sensors, and presents some initial results.BackgroundPower plant equipment and systems require instrumentation to operate efficiently, to detect and prevent equipment faults, and to support ...

2013-09-13T23:59:59.000Z

31

Preliminary requirements for thermal storage subsystems in solar thermal applications  

DOE Green Energy (OSTI)

Methodologies for the analysis of value and comparing thermal storage concepts are presented. Value is a measure of worth and is determined by the cost of conventional fuel systems. Value data for thermal storage in large solar thermal electric power applications are presented. Thermal storage concepts must be compared when all are performing the same mission. A method for doing that analysis, called the ranking index, is derived. Necessary data to use the methodology are included.

Copeland, R.J.

1980-04-01T23:59:59.000Z

32

Market Driven Distributed Energy Storage Requirements for Load Management Applications  

Science Conference Proceedings (OSTI)

Electric energy storage systems are an enabling technology that could help meet the needs of electric utility by managing peak energy demands, helping shift the peak loads to off peak hours and improving the load factor of the electric distribution system. Applications of distributed energy storage systems (DESS) could also provide power quality and reliability benefits to customers and to the electric system. EPRI collaborated with several investor owned utilities to conduct a study to understand the te...

2007-04-18T23:59:59.000Z

33

Functional Requirements of Next Generation Control Center Applications  

Science Conference Proceedings (OSTI)

Future electric grids will operate in an environment where there are increasing renewables, demand responses, and storage with aging infrastructures. Next generation control centers (NGCC) need enhanced and new monitoring, analysis, and control functions to help operators improve efficient, reliable, and low-carbon operation of the grid. This report reviews the status and trends in the integration of renewable generation, demand responses, and storage systems, and recommends requirements for NGCC functio...

2011-06-15T23:59:59.000Z

34

Gathering of requirements on WebGIS development: the example of bikeway mapping application  

Science Conference Proceedings (OSTI)

The article presents results of original research concerning proposal of WebGIS application with cycling topics. The main contribution of the proposal is in gathering of user requests on content and functionality. According to focus of this application, ... Keywords: GIS, bikeway, cyclist, mapping application, requirements, usability, webGIS

Hana Kopackova; Hana Jonasova; Iva Mikesova; Jana Hejlova

2011-12-01T23:59:59.000Z

35

Medical Application Platform Apps Requirements Engineering Brian Larson, John Hatcliff, Sam Procter, Patrice Chalin  

E-Print Network (OSTI)

Medical Application Platform Apps Requirements Engineering Brian Larson, John Hatcliff, Sam Procter agency guidance documents and process standards for medical devices (i.e., IEC 62304) generally consider medical devices to be stand-alone monolithic systems. The format and content of a system requirements

Huth, Michael

36

A generic ontology-based approach for requirement analysis and its application in network management software  

Science Conference Proceedings (OSTI)

This paper describes a generic ontology-based approach that eases the requirement analysis (RA) work. The approach enables the user to derive method-specific RA tools for different applications. The derivation process is based on a unified framework ... Keywords: Acquisition Ontology, Knowledge Acquisition, Knowledge-based Systems, Methodology Ontology, Requirement Analysis

Chau-Young Ivan Lin; Cheng-Seen Ho

1999-01-01T23:59:59.000Z

37

Step 4. Design a building to meet the requirements of the applicable energy  

NLE Websites -- All DOE Office Websites (Extended Search)

4. Design a building to meet the requirements of the applicable energy 4. Design a building to meet the requirements of the applicable energy code Designing a building to meet the requirements of the energy code can impact the look, feel, and function of the building. Energy codes also affect the design of all building systems separately and collectively. It is very important that the professionals responsible for designing the building envelope, lighting, and HVAC work together to consider interactions to best control overall building energy use. Integrated design, although not a requirement of the model codes and standards, is critical to minimizing initial project cost and being as effective as possible. WBDG.org, a web-based portal from the National Institute of Building Sciences that provides information on whole-building design, defines the

38

Small turbines in distributed utility application: Natural gas pressure supply requirements  

SciTech Connect

Implementing distributed utility can strengthen the local distribution system and help avoid or delay the expense of upgrading transformers and feeders. The gas turbine-generator set is an attractive option based on its low front-end capital cost, reliable performance at unmanned stations, and environmental performance characteristics. This report assesses gas turbine utilization issues from a perspective of fuel supply pressure requirements and discusses both cost and operational factors. A primary operational consideration for siting gas turbines on the electric distribution system is whether the local gas distribution company can supply gas at the required pressure. Currently available gas turbine engines require gas supply pressures of at least 150 pounds per square inch gauge, more typically, 250 to 350 psig. Few LDCs maintain line pressure in excess of 125 psig. One option for meeting the gas pressure requirements is to upgrade or extend an existing pipeline and connect that pipeline to a high-pressure supply source, such as an interstate transmission line. However, constructing new pipeline is expensive, and the small volume of gas required by the turbine for the application offers little incentive for the LDC to provide this service. Another way to meet gas pressure requirements is to boost the compression of the fuel gas at the gas turbine site. Fuel gas booster compressors are readily available as stand-alone units and can satisfactorily increase the supply pressure to meet the turbine engine requirement. However, the life-cycle costs of this equipment are not inconsequential, and maintenance and reliability issues for boosters in this application are questionable and require further study. These factors may make the gas turbine option a less attractive solution in DU applications than first indicated by just the $/kW capital cost. On the other hand, for some applications other DU technologies, such as photovoltaics, may be the more attractive option.

Goldstein, H.L.

1996-05-01T23:59:59.000Z

39

EVALUATION OF STATE-OF-THE-ART MANIPULATORS AND REQUIREMENTS FOR DOE ROBOTICS APPLICATIONS  

Science Conference Proceedings (OSTI)

This report provides an overview of applications within the DOE complex which could benefit from the use of modular robotics technology during remediation operations. Each application area contains one or more specific tasks which are presently conducted by humans under hazardous conditions or which are deemed highly impractical, or are altogether impossible without automation. Five major areas were investigated for specific needs with respect to automation. Information was collected on Mixed Waste Operations, Contaminant Automated Analysis, Tanks, Decontamination and Dismantlement and Automated Plutonium Processing. During this investigation, information was gathered from available literature, telephone interviews with informed personnel and on-site visits. This data serves to provide design requirements and guidelines for the design of a family of modular actuators, which will be used to construct manipulators suited to each task. In addition, a survey of existing modular manipulator designs is presented. This survey addresses modular manipulators developed inside government labs and in universities for such applications as space exploration or controls research. It also addresses efforts at commercially viable industrial manipulators which have been built. This survey of robotic systems provides the reader with a glimpse into what technology currently exists in the way of modular manipulator automation and, to a degree, where this technology may be applicable or, more often, where these systems are unsuited to EM applications. From the information gathered during this study, it is possible to sufficiently define the requirements of one manipulator system which can be used to conduct automated transfer operations within Plutonium gloveboxes. This manipulator will be constructed from ARM Automation actuator modules and will provide this application with a viable option for automation within these gloveboxes. The design issues surrounding this manipulator and its specifications are discussed in the final portion of this report.

BLACK, DEREK; GRUPINSKI, STEPHEN

1998-10-08T23:59:59.000Z

40

PRELIMINARY REVIEW OF NECPA GENERATED INFORMATION REQUIREMENTS FOR THE OFFICE OF CONSERVATION AND SOLAR APPLICATIONS  

SciTech Connect

Effective implementation of energy conservation policy requires large quantities of various types of good quality, timely data. To obtain the desired data, the information requirements must first be identified so that they can be communicated in a justifiable form to the Energy Information Administration (EIA) and other data collecting organizations. This report represents the initial results of an effort to describe the general information needed by the Office of Conservation and Solar Applications (CS) to carry out their responsibility in implementing the National Energy Conservation Policy Act (NECPA). The assessment of the NECPA-generated information requirements is organized around the conservation programs for utilities, residences, industry, federal and public buildings and transportation. This assessment identifies the factors that generate the information requirements (sections, parts and titles of NECPA), describes the general information needed to implement the act and references potential sources of data. Appendix A contains a summary of this assessment in,table form. This report is the first in a series in a study to assess the information and data requirements of the Conservation and Solar Office. Subsequent reports will concentrate on specific programs to access detailed data needs .

Rivera, R. G.; Nieves, A. L.

1979-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Public Response to Residential Grid-Tied PV Systems in Colorado  

NLE Websites -- All DOE Office Websites (Extended Search)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 15. Square Footage of Home . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

42

Economical design of gate-commutated inverters for the grid-tied distributed generators  

Science Conference Proceedings (OSTI)

The cost-effectiveness of small distributed generating resources is vital to the success of the high penetration of distributed generators within the microgrid concept. A common mechanism is the use of highly efficient inverters following the electrical storage systems. In this paper

Mujahidul Islam; Adedamola Omole; Arif Islam; Alexander Domijan Jr.

2011-01-01T23:59:59.000Z

43

Application analysis of solar total energy systems to the residential sector. Volume II, energy requirements. Final report  

DOE Green Energy (OSTI)

This project analyzed the application of solar total energy systems to appropriate segments of the residential sector and determined their market penetration potential. This volume covers the work done on energy requirements definition and includes the following: (1) identification of the single-family and multi-family market segments; (2) regionalization of the United States; (3) electrical and thermal load requirements, including time-dependent profiles; (4) effect of conservation measures on energy requirements; and (5) verification of simulated load data with real data.

Not Available

1979-07-01T23:59:59.000Z

44

Control Center Application Program Interface (CCAPI) Project: API Standard Proposal Requirements for Generic Interface Definition (GID)  

Science Conference Proceedings (OSTI)

The Control Center Application Program Interface (CCAPI) Task Force is charged with producing design criteria for international energy management system (EMS) standards. Their aim is to integrate independently developed EMS applications. The resulting standards will provide utilities with competitive choices in the design of their control systems, while offering less expensive applications to meet the needs of the rapidly changing electric power industry. The initial Task Force deliverable was the Common...

2001-11-29T23:59:59.000Z

45

A discussion on life-cycle costs of residential photovoltaic systems  

DOE Green Energy (OSTI)

This paper discusses the characteristics and needed improvements/enhancements required for the expansion of the grid-tied residential power systems market. The purpose of the paper is to help establish a common understanding, between the technical community and the customers of the technology, of value and costs and what is required in the longer term for reaching the full potential of this application.

THOMAS,MICHAEL G.; CAMERON,CHRISTOPHER P.

2000-04-11T23:59:59.000Z

46

A systems approach to identifying aircraft equipage requirements, benefits, and risks of ADS-B applications  

E-Print Network (OSTI)

Automatic Dependent Surveillance-Broadcast (ADS-B) is considered to be a crucial part of the next generation of air transportation systems worldwide. Developing mature ADS-B applications which provide stakeholders with ...

Jenkins, Marisa Rachael

2009-01-01T23:59:59.000Z

47

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)  

SciTech Connect

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Sears, T.

2014-01-01T23:59:59.000Z

48

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements  

SciTech Connect

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Not Available

2013-03-01T23:59:59.000Z

49

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)  

DOE Green Energy (OSTI)

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

Not Available

2010-11-01T23:59:59.000Z

50

Wireless Communication for Smart Grid Applications at Distribution Level Feasibility and Requirements  

E-Print Network (OSTI)

Wireless Communication for Smart Grid Applications at Distribution Level ­ Feasibility Member IEEE, and Ward Jewell, Fellow IEEE Abstract-- Smart grid technology places greater demands high importance for the smart grid. There has already been significant work done on power system

Namboodiri, Vinod

51

An Overview of Nuclear vs. Non-Nuclear Design Code Requirements for a Candidate Steam Supply System for Commercial Applications  

SciTech Connect

The objective is to identify (mostly for industrial end-users) the difference between a Section III nuclear steam generator (classified as Structures, Systems and Components (SSC)) and a Section VIII steam generator in the same general conditions, but used in a conventional application. Specifically, applicable temperature and pressure ranges and a more quantitative description of how materials change, design margins change and required design rigor changes are of interest. This overview focuses on the steam generator pressure boundary but the downstream piping will also be considered. Within the designations of Section III and Section VIII there are subcategories with their specific regions of applicability. Each of these subcategories has evolved their own unique features with respect to design rules and their implementation. A general overview of the various design codes will be provided in sufficient detail to illustrate the major differences; however, a detailed discussion of the various design requirements and their implementation is beyond the scope of this discussion. References (1) and (2) are sources of more detailed information. Also, example wall sizing calculations will be provided to illustrate the application of the relevant design codes under the candidate design conditions. The candidate steam supply Design Conditions are 600C (1112F) and 24MPa (3,480psi). The Operating Conditions or Service Levels will be somewhat lower and the difference shows up in some of the various design methodologies employed.

Robert Jetter

2011-04-01T23:59:59.000Z

52

AMI Communication Requirements to Implement Demand-Response: Applicability of Hybrid Spread Spectrum Wireless  

Science Conference Proceedings (OSTI)

While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.

Hadley, Mark D.; Clements, Samuel L.; Carroll, Thomas E.

2011-09-30T23:59:59.000Z

53

“AC Solar Cells”: An Embedded “All in One” PV Power System  

Science Conference Proceedings (OSTI)

Grid-tied power converters in a photovoltaic (PV) system constructed from discrete components are difficult to mass produce, and the installation involves a significant labor cost to have the proper interconnection among the panel, the inverter, and the grid. Several critical applications such as portable power stations in a battlefield or any scientific expedition will require several key attributes from a PV-based power system, such as modularity, high reliability, and quick setup time. Therefore, a ...

2013-12-18T23:59:59.000Z

54

Application of Risk Analysis to Evaluating M&V Requirement for Energy Efficiency Program  

E-Print Network (OSTI)

Since 2005, CIPP of New York Energy Smart has waived the monitoring requirement for lighting projects with small projected savings that are 600,000 kWh/yr or less. There is potential to further increase the threshold savings with additional administrative efficiencies, but also with increased risk that the estimated savings may not be realized. This paper presented a risk analysis of the threshold for small lighting projects by running a Monte Carlo simulation. The preliminary result of this study shows that increasing the size of lighting project savings for which M&V is waived to 1,400,000 kWh per year would introduce an error of only ±5% to the sum of all lighting savings. The error introduced at the program level would be approximately ±2%. The lessons from this experiment may be used to conduct large-scale risk analysis to optimize evaluation cost allocations for more complex energy efficiency program portfolio.

Tan, G.; Gregoire, C.; Gogte, S.; Gowans, D.

2007-01-01T23:59:59.000Z

55

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition  

DOE Green Energy (OSTI)

This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

Not Available

1985-01-01T23:59:59.000Z

56

Rechargeable lithium battery for use in applications requiring a low to high power output  

DOE Patents (OSTI)

Rechargeable lithium batteries which employ characteristics of thin-film batteries can be used to satisfy power requirements within a relatively broad range. Thin-film battery cells utilizing a film of anode material, a film of cathode material and an electrolyte of an amorphorus lithium phosphorus oxynitride can be connected in series or parallel relationship for the purpose of withdrawing electrical power simultaneously from the cells. In addition, such battery cells which employ a lithium intercalation compound as its cathode material can be connected in a manner suitable for supplying power for the operation of an electric vehicle. Still further, by incorporating within the battery cell a relatively thick cathode of a lithium intercalation compound, a relatively thick anode of lithium and an electrolyte film of lithium phosphorus oxynitride, the battery cell is rendered capable of supplying power for any of a number of consumer products, such as a laptop computer or a cellular telephone.

Bates, John B. (Oak Ridge, TN)

1996-01-01T23:59:59.000Z

57

Rechargeable lithium battery for use in applications requiring a low to high power output  

SciTech Connect

Rechargeable lithium batteries which employ characteristics of thin-film batteries can be used to satisfy power requirements within a relatively broad range. Thin-film battery cells utilizing a film of anode material, a film of cathode material and an electrolyte of an amorphous lithium phosphorus oxynitride can be connected in series or parallel relationship for the purpose of withdrawing electrical power simultaneously from the cells. In addition, such battery cells which employ a lithium intercalation compound as its cathode material can be connected in a manner suitable for supplying power for the operation of an electric vehicle. Still further, by incorporating within the battery cell a relatively thick cathode of a lithium intercalation compound, a relatively thick anode of lithium and an electrolyte film of lithium phosphorus oxynitride, the battery cell is rendered capable of supplying power for any of a number of consumer products, such as a laptop computer or a cellular telephone.

Bates, John B. (Oak Ridge, TN)

1997-01-01T23:59:59.000Z

58

Testing requirements for variable-speed generating technology for wind turbine applications. Final report  

Science Conference Proceedings (OSTI)

Guidelines for evaluating the impacts of integrating variable-speed, constant-frequency (VSCF) wind turbines into electric utility systems have been proposed based upon prior test experiences with the NASA VSCF system and the expected performance of the Westinghouse and OMNION VSCF systems. The NASA and Westinghouse VSCF generating systems use a wound rotor induction generator and a cycloconverter, while the OMNION system uses a wound rotor induction generator and a dc-current link converter. The design of VSCF/utility system interface requirements and test plans is based on utility system electrical issues such as utility system control and operation, protection, voltage/reactive power management, power quality, and reliability. A framework for testing VSCF concepts is proposed which includes a three stage process: modeling of the system to analyze design alternatives and simulate disturbances that could be harmful to the actual system; laboratory testing which involves the use of the system under controlled conditions; and field testing to collect data under actual conditions to validate models and analyze the wind turbine behavior.

Herrera, J.I.

1986-05-01T23:59:59.000Z

59

Review Article: A comprehensive review of the application characteristics and traffic requirements of a smart grid communications network  

Science Conference Proceedings (OSTI)

A robust communication infrastructure is the touchstone of a smart grid that differentiates it from the conventional electrical grid by transforming it into an intelligent and adaptive energy delivery network. To cope with the rising penetration of renewable ... Keywords: AMI, AMR, ANSI, Applications, Communication architecture, Communication technologies, DAP, DER, DR, ESI, EV, FAN, GOOSE, HAN, HV, IEC, IED, IEEE, IP, M2M, MDMS, MU, NAN, P&C, PMU, QoS, SMV, SOC, Smart grid, Traffic requirements, WAMS, WLAN, WMN, WiMAX

Reduan H. Khan; Jamil Y. Khan

2013-02-01T23:59:59.000Z

60

Efficient Switches for Solar Power Conversion: Four Quadrant GaN Switch Enabled Three Phase Grid-Tied Microinverters  

Science Conference Proceedings (OSTI)

Solar ADEPT Project: Transphorm is developing power switches for new types of inverters that improve the efficiency and reliability of converting energy from solar panels into useable electricity for the grid. Transistors act as fast switches and control the electrical energy that flows in an electrical circuit. Turning a transistor off opens the circuit and stops the flow of electrical current; turning it on closes the circuit and allows electrical current to flow. In this way a transistor can be used to convert DC from a solar panel into AC for use in a home. Transphorm’s transistors will enable a single semiconductor device to switch electrical currents at high-voltage in both directions—making the inverter more compact and reliable. Transphorm is using Gallium Nitride (GaN) as a semiconductor material in its transistors instead of silicon, which is used in most conventional transistors, because GaN transistors have lower losses at higher voltages and switching frequencies.

None

2012-02-13T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Technical Specification action statements requiring shutdown. A risk perspective with application to the RHR/SSW systems of a BWR  

SciTech Connect

When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements.

Mankamo, T. [Avaplan Oy, Espoo (Finland); Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States)

1993-11-01T23:59:59.000Z

62

A single-phase photovoltaic inverter topology with a series-connected power buffer  

E-Print Network (OSTI)

Module integrated converters (MICs) have been under rapid development for single-phase grid-tied photovoltaic applications. The capacitive energy storage implementation for the double-line-frequency power variation represents ...

Pierquet, Brandon J.

63

Welding and Repair Technology Center: Evaluation of Hardness Requirements for Temper Bead Welding Applications--Preliminary Review  

Science Conference Proceedings (OSTI)

Qualification of welding procedures for structural members and pressure boundary components in accordance with American Society of Mechanical Engineers (ASME) codes frequently requires impact testing. Specifically, the Charpy V-notch test is often used to assess base material, heat-affected zone, and weld metal impact properties. Impact testing is specified in the ASME codes to ensure that materials will have adequate fracture toughness and behave in a ductile manner under service conditions. ...

2013-10-14T23:59:59.000Z

64

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... Usage scenario. ... imposed by public safety applications and usage scenarios is key in ... requirements as shown in Figure 2. This analysis was used as ...

2010-10-05T23:59:59.000Z

65

Evaluation of the applicability of existing nuclear power plant regulatory requirements in the U.S. to advanced small modular reactors.  

SciTech Connect

The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of management and operations. By optimizing the system, the goal is to make these power plants safer, cheaper to operate and maintain, and more secure. In particular, the reduction in plant staffing can result in significant cost savings. The introduction of advanced reactor designs and increased use of advanced automation technologies in existing nuclear power plants will likely change the roles, responsibilities, composition, and size of the crews required to control plant operations. Similarly, certain security staffing requirements for traditional operational nuclear power plants may not be appropriate or necessary for SMRs due to the simpler, safer and more automated design characteristics of SMRs. As a first step in a process to identify where regulatory requirements may be met with reduced staffing and therefore lower cost, this report identifies the regulatory requirements and associated guidance utilized in the licensing of existing reactors. The potential applicability of these regulations to advanced SMR designs is identified taking into account the unique features of these types of reactors.

LaChance, Jeffrey L.; Wheeler, Timothy A.; Farnum, Cathy Ottinger; Middleton, Bobby D.; Jordan, Sabina Erteza; Duran, Felicia Angelica; Baum, Gregory A.

2013-05-01T23:59:59.000Z

66

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

67

Unmanned Aerial Vehicle (UAV) Dynamic-Tracking Directional Wireless Antennas for Low Powered Applications that Require Reliable Extended Range Operations in Time Critical Scenarios  

Science Conference Proceedings (OSTI)

The proven value of DOD Unmanned Aerial Vehicles (UAVs) will ultimately transition to National and Homeland Security missions that require real-time aerial surveillance, situation awareness, force protection, and sensor placement. Public services first responders who routinely risk personal safety to assess and report a situation for emergency actions will likely be the first to benefit from these new unmanned technologies. ‘Packable’ or ‘Portable’ small class UAVs will be particularly useful to the first responder. They require the least amount of training, no fixed infrastructure, and are capable of being launched and recovered from the point of emergency. All UAVs require wireless communication technologies for real- time applications. Typically on a small UAV, a low bandwidth telemetry link is required for command and control (C2), and systems health monitoring. If the UAV is equipped with a real-time Electro-Optical or Infrared (EO/Ir) video camera payload, a dedicated high bandwidth analog/digital link is usually required for reliable high-resolution imagery. In most cases, both the wireless telemetry and real-time video links will be integrated into the UAV with unity gain omni-directional antennas. With limited on-board power and payload capacity, a small UAV will be limited with the amount of radio-frequency (RF) energy it transmits to the users. Therefore, ‘packable’ and ‘portable’ UAVs will have limited useful operational ranges for first responders. This paper will discuss the limitations of small UAV wireless communications. The discussion will present an approach of utilizing a dynamic ground based real-time tracking high gain directional antenna to provide extend range stand-off operation, potential RF channel reuse, and assured telemetry and data communications from low-powered UAV deployed wireless assets.

Scott G. Bauer; Matthew O. Anderson; James R. Hanneman

2005-10-01T23:59:59.000Z

68

PIT Coating Requirements Analysis  

SciTech Connect

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

69

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

70

Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance  

Science Conference Proceedings (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms applicable'' and relevant and appropriate'' is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

Etnier, E.L.; Eaton, L.A. (Oak Ridge National Lab., TN (United States))

1992-03-01T23:59:59.000Z

71

Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

Etnier, E.L.; Eaton, L.A. [Oak Ridge National Lab., TN (United States)

1992-03-01T23:59:59.000Z

72

Applications  

Science Conference Proceedings (OSTI)

Table 6   Typical applications of duplex stainless steels...salt evaporation equipment, desalination plants, geothermal

73

Applications  

Science Conference Proceedings (OSTI)

Table 3   Wear-, erosion-, and corrosion-resistance applications of CVD...against neutron radiation

74

A framework for real-time power management of a grid-tied microgrid to extend battery lifetime and reduce cost of energy  

Science Conference Proceedings (OSTI)

Because of different technical and economical concerns, battery is happened to be an inevitable part of a microgrid as well as the most expensive component. This fact brings up the necessity of a real-time power management to guarantee the maximum possible ...

S. A. Pourmousavi; Ratnesh K. Sharma; Babak Asghari

2012-01-01T23:59:59.000Z

75

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

76

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

77

Applications  

Science Conference Proceedings (OSTI)

Table 8   Major markets for ABS products...Market category Applications ABS grades Major appliances Refrigerator door and food liners; crisper pans;

78

Applications  

Science Conference Proceedings (OSTI)

Table 5   Selected applications for wrought aluminum alloys...vehicles, trucks and trailers 3105 Residential siding, mobile homes, rain-carrying goods,

79

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

80

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

82

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

83

Applications  

Science Conference Proceedings (OSTI)

Table 2   Applications for titanium and titanium alloys...for FGD units, nuclear waste disposal Geothermal energy Heat exchangers, evaporators, condensers, tubes Marine engineering Shipbuilding Heat exchangers, condensers, piping

84

Applications  

Science Conference Proceedings (OSTI)

Table 2   Examples of applications and parts made with vacuum infusion...small aircraft Industrial Fan blades, part for fish counting unit, toilet bowl, oil

85

Applications  

Science Conference Proceedings (OSTI)

Table 6 Selected applications for aluminum casting alloys...gears; jet engine compressor cases 356.0 Sand: flywheel castings; automotive transmission cases; oil pans; pump bodies. Permanent: machine tool parts;

86

Applications  

Science Conference Proceedings (OSTI)

Table 1   Application of sintered stainless steels...316L Photographic equipment 316L Cam cleats 304L Dishwasher components 304L Can opener gears 410L...

87

Applications:  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications: Applications: ● Telecommunications: cell / smartphone; multi-party secure phone calls; videoconferencing; Voice over IP (VoIP) ● Banking and financial transactions: ATM, debit / credit card and e-Commerce ● e-Business; e-gaming; e-books; e-music; e-movies; e-gambling ● Wireless internet ● Electronic voting ● Facility and vehicle access ● Information exchange for government/defense

88

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

89

Applications  

Science Conference Proceedings (OSTI)

Table 3   Major application areas of porous P/M materials...refining Semiconductor Particle removal process gas Bulk gas delivery systems Purifier media retainers Analysis instruments Gas/liquid chromatography Gas sampling Sensor protection Chemical processing Catalyst recovery Process gases and liquids Fluid-bed reactor products Mineral processing Coal,...

90

Applications  

Science Conference Proceedings (OSTI)

Table 3   Some applications of investment casting...Electrical equipment Electronics, radar Guns and small armaments Hand tools Jewelry Machine tools Materials handling equipment Metal working equipment Oil well drilling and auxiliary equipment Optical equipment Packaging equipment Pneumatic and hydraulic systems Prosthetic appliances Pumps Sports gear...

91

Applications  

Science Conference Proceedings (OSTI)

Table 1   Commercial applications of refractory metals and alloys by industry...Rhenium, W-Re Process industries Heating and cooling coils Tantalum, Ta-Nb Shell and tube heat exchangers Tantalum Condensers Tantalum Tantalum-clad steel vessels Tantalum Distillation towers Tantalum Valves for hot sulfuric acid service Molybdenum, tantalum, Ta-Nb Expansion joints (bellows) Tantalum...

92

Applications  

Science Conference Proceedings (OSTI)

Table 9   Applications of various polymers...bins 767 aircraft acoustical tile 767 and other Boeing aircraft brackets Airbus A320 bulk cargo floor sandwich structural panels Airbus A330-340 lower wing fairings A3XX main stair case (developmental) Beluga heavy-duty entrance floor panels Dornier 328 landing flap ribs Dornier 328 ice protection...

93

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

94

Functional Requirements for Customer Communications  

Science Conference Proceedings (OSTI)

Customer communications infrastructures could support a wide variety of useful utility operations and industry-wide applications. However, these systems will require a substantial investment, which necessitates viewing customer communications with multiple stakeholders and applications in mind. This report describes the development of requirements for customer interface applications such as revenue metering, communications gateways, and remote equipment operations that can provide the basis for powerful ...

2002-12-18T23:59:59.000Z

95

Building security requirements with CLASP  

Science Conference Proceedings (OSTI)

Traditionally, security requirements have been derived in an ad hoc manner. Recently, commercial software development organizations have been looking for ways to produce effective security requirements.In this paper, we show how to build security ... Keywords: application security, security process, security requirements

John Viega

2005-07-01T23:59:59.000Z

96

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 43.2 (June 2010) Chapter 43.2 (June 2010) 1 Change Order Template References FAR Subpart 43.2, "Change Orders" Policy Flash 2008-39, "Contract Change Order Administration of Department of Energy (DOE) Prime Contracts" Acquisition Guide 15.4-1, "Pricing Contract Modifications" Acquisition Guide 37.2, "Performance Based Service Acquisition" Overview This section provides a change order template to expedite the contracting process by helping assure a consistent application of the contract terms for various change order modifications to

97

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 43.2 (August 2013) Chapter 43.2 (August 2013) Change Order Administration References * FAR Subpart 43.2, "Change Orders" * Policy Flash 2008-39, "Contract Change Order Administration of Department of Energy (DOE) Prime Contracts" * Acquisition Guide 15.4-1, "Pricing Contract Modifications" Overview This chapter provides guidance to ensure the proper issuance and administration of change orders. A change order template and sample clauses are provided in order to facilitate consistent application across the complex. Background A change order is a written order, signed by the Contracting Officer, directing the contractor to make a change (authorized by the Changes clause) on a unilateral basis. The Changes clause

98

Analytical Requirements for Petroleum Contaminated Soils  

E-Print Network (OSTI)

Analytical Requirements for Petroleum Contaminated Soils According to 20 NMAC 9.1.704 704. REQUIRED), or other applicable statutes. Page 1 of 1Analytical Requirements for Petroleum Contaminated Soils 4

99

Development and application of a permit information system for shale oil (PERMISSO). Final report appendix: summary sheets of regulations required for oil shale development, June 1978--May 1979  

DOE Green Energy (OSTI)

This appendix is comprised of summaries of various governmental permits, licenses and other approvals required for oil shale development. The summaries were completed during the period June--October 1978, and are current as of July 1, 1978, although more recent authority was cited in some cases. One of the major purposes of Phase II of the project will be to update these summaries as statutes and regulations are added, changed or eliminated. This updating will be particularly important in the case of environmental permits and approvals. Many legislative and regulatory changes affecting environmental requirements are pending at this time and will alter many of the summaries herein. In addition, many regulatory proposals have been or likely will be challenged in the courts. When such conflicts are resolved further changes may be in order.

Not Available

1979-07-01T23:59:59.000Z

100

Application Form  

Science Conference Proceedings (OSTI)

ELIGIBILITY REQUIREMENTS. The application ... Note: Applying for the travel award does not enter your abstract into the TMS Conference Management System.

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Project X functional requirements specification  

SciTech Connect

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Mishra, S.; Nagaitsev, S.; Tschirhart, R.; /Fermilab

2011-03-01T23:59:59.000Z

102

Building Energy Software Tools Directory: Roanakh  

NLE Websites -- All DOE Office Websites (Extended Search)

Roanakh Roanakh Logo for Roanakh Web-based application with the theory and embedded calculations required to completely design any PV system. Novices and advanced users can use the automated calculations to design and validate their PV systems. It is the goal of Roanakh.com to spread the knowledge and techniques required to build PV systems to a vast majority of the people looking for such information free of cost. Using the latest in web design techniques and with built in libraries of PV system components, Roanakh.com allows users to completely design and/or validate their PV system. Screen Shots Keywords photovoltiac system design, grid-tie, grid-interactive, solar electric system design Validation/Testing Reviewed by GLREA, Solar Living Institute, Oakland University, MI.

103

Requirements of Magnetic Materials for Current Technological ...  

Science Conference Proceedings (OSTI)

Mar 3, 2011 ... Magnetic Materials for Energy Applications: Requirements of Magnetic ... Hard magnetic materials play a significant role in many green ...

104

Alternative Fuels Data Center: Vehicle Registration Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Registration Vehicle Registration Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Registration Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Registration Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Registration Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Registration Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Registration Requirement Motor vehicle registration applicants must provide proof of compliance with

105

Repository seals requirement study  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

106

Repository seals requirements study  

SciTech Connect

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. This report presents the results of a repository sealing requirements study. Sealing is defined as the permanent closure of the shafts, ramps, and exploratory boreholes. Sealing includes those components that would reduce potential inflows above the repository, or that would divert flow near the repository horizon to allow vertical infiltration to below the repository. Sealing of such features as emplacement drifts was not done in this study because the current capability to calculate fracture flow into the drifts is not sufficiently mature. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

107

Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

108

Quantifying requirements volatility effects  

Science Conference Proceedings (OSTI)

In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements ... Keywords: ?-ratio, ?-ratio, Compound monthly growth rate, IT dashboard, IT portfolio management, Quantitative IT portfolio management, Requirements churn, Requirements creep, Requirements metric, Requirements scrap, Requirements volatility, Requirements volatility dashboard, Scope creep, Volatility benchmark, Volatility tolerance factor

G. P. Kulk; C. Verhoef

2008-08-01T23:59:59.000Z

109

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

110

BER Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

111

ASCR Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

112

TVDG Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Requirements TVDG Training Requirements information is now located at: http:www.bnl.govuserscenterTrainingtandem.asp. You will automatically be taken to the new...

113

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

114

Requirement-Reviews.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Published 3 h%p:www.nersc.govsciencerequirements---reviews final---reports * Compurequirements f or 20132014 * Execurequirements * Case s...

115

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

116

Collaborative Requirements Engineering Project  

Science Conference Proceedings (OSTI)

... dependencies, safety, and environmental requirements) is essential to the ... Construction, and Operation of Constructed Facilities, March 2012. ...

2013-01-03T23:59:59.000Z

117

Automated consistency checking of requirements specifications  

Science Conference Proceedings (OSTI)

This article describes a formal analysis technique, called consistency checking, for automatic detection of errors, such as type errors, nondeterminism, missing cases, and circular definitions, in requirements specifications. The technique ... Keywords: application-independent properties, consistency checking, formal requirements modeling, software cost reduction methodology, tabular notations

Constance L. Heitmeyer; Ralph D. Jeffords; Bruce G. Labaw

1996-07-01T23:59:59.000Z

118

Designating required vs. optional input fields  

Science Conference Proceedings (OSTI)

This paper describes a study comparing different techniques for visually distingishing required from optional input fields in a form-filling application. Seven techniques were studied: no indication, bold field labels, chevrons in front of the labels, ... Keywords: data input, optional fields, required fields, visual design

Thomas S. Tullis; Ana Pons

1997-03-01T23:59:59.000Z

119

Requirements for wireless technology on rolling stock  

Science Conference Proceedings (OSTI)

This paper gives an overview of railway specific requirements on wireless technologies and discusses the influence of different product life cycles in railway industry and communication technology. The main challenges are the heterogeneous communication ... Keywords: maintenance, passenger information, product life cycle, railway application interface, railway requirements, train operation, wireless communication

Uwe Kucharzyk

2011-03-01T23:59:59.000Z

120

Emergency Medical Treatment Required  

E-Print Network (OSTI)

Emergency Medical Treatment Required Non-Emergency Medical Treatment Required If possible, get help present if possible OptaComp will complete the "First Report of Injury or Illness" and authorize medical Investigation Report" to Environmental Health & Safety within 48 hours Emergency Medical Treatment Required

Weston, Ken

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

FES Science Network Requirements  

E-Print Network (OSTI)

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

122

Safety of magnetic fusion facilities: Requirements  

SciTech Connect

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

1996-05-01T23:59:59.000Z

123

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

124

Guide to NRC reporting and recordkeeping requirements  

SciTech Connect

This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the Code of Federal Regulations, Chapter I, on December 31, 1991. It also includes, in a separate section, any of those requirements that were superseded or discontinued from January through December 1991. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation.

Collins, M.; Shelton, B.

1992-11-01T23:59:59.000Z

125

Qualification of the Framatome ANP TXS Digital Safety I&C System - Revision to EPRI TR-114017: Compliance with EPRI TR-107330, "Gene ric Requirements Specification for Qualifying a Commercially Available PLC for Safety-Related Applications in Nuclear P..  

Science Conference Proceedings (OSTI)

As its nuclear power plants age, the electric power industry is focusing on developing cost-effective replacement systems for obsolete instrumentation, control, and safety systems. This report describes the generic qualification of a platform for safety-related applications that incorporates programmable logic controllers (PLCs), a technology with an excellent track record in non-nuclear applications for critical control and safety functions.

2002-07-16T23:59:59.000Z

126

ASCR Science Network Requirements  

E-Print Network (OSTI)

Scott Klasky, ORNL (OLCF Applications) Miron Livny,Office) Jim Rogers, ORNL (OLCF) Yukiko Sekine, DOE/SC/ASCR (OLCF) . 36 7

Dart, Eli

2010-01-01T23:59:59.000Z

127

Mandatory Supervisory Training Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

128

Management requirements for accreditation  

Science Conference Proceedings (OSTI)

... handbook, shall be defined in the quality manual. ... It is a fundamental requirement that the results ... NIST Handbook 150 (and ISO/IEC 17025) details ...

2013-08-20T23:59:59.000Z

129

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... need excellent situational awareness in order to do their jobs effectively. ... performance requirements as shown in Figure 2. This analysis was used ...

2013-03-13T23:59:59.000Z

130

CCI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for...

131

ASCR Science Network Requirements  

E-Print Network (OSTI)

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD — April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

132

New Employee Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

All New Employees New Supervisors New Employee Training Requirements Welcome to Berkeley Lab We value you and the talents that you bring to our workplace. The training listed...

133

Enhanced oil recovery water requirements  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are evaluated using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in 14 major oil companies. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and CO/sub 2/, micellar-polymer, polymer, and caustic flooding) in those states and specific geographic locations where these processes will play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources. A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can reduce significantly the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality surface water and ground water could be impediments to certain projects in the near future.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1983-03-01T23:59:59.000Z

134

Qualification of Siemens Power Corporation TELEPERM XS Safety System: Compliance with EPRI TR-107330 "Generic Requirements Specifica tion for Qualifying a Commercially Available PLC for Safety-Related Applications in Nuclear Power Plants"  

Science Conference Proceedings (OSTI)

As its nuclear power plants age, the electric power industry is focusing on the development of cost-effective replacement systems for obsolete instrumentation, control, and safety systems. This report describes the generic qualification of a platform for safety-related applications that incorporates programmable logic controllers (PLCs), a technology with an excellent track record in non-nuclear applications for critical control and safety functions.

1999-11-23T23:59:59.000Z

135

The 8 requirements of real-time stream processing  

Science Conference Proceedings (OSTI)

Applications that require real-time processing of high-volume data steams are pushing the limits of traditional data processing infrastructures. These stream-based applications include market feed processing and electronic trading on Wall Street, network ...

Michael Stonebraker; U?ur Çetintemel; Stan Zdonik

2005-12-01T23:59:59.000Z

136

Integrated Management Requirements mapping  

Science Conference Proceedings (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

137

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

138

Electric Transportation Applications All Rights Reserved ETA...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Certification Requirements for Personnel Utilizing ETA Procedures Prepared by Electric Transportation Applications Prepared by: ...

139

The identification of integrity constraints in requirements for context monitoring  

Science Conference Proceedings (OSTI)

The rapid advancement of technology has created the demand for more complex systems that require deep and diverse application-specific knowledge. Building such systems requires expertise in domain-specific knowledge that could include areas such as flight ...

A. Q. Gates; C. Kubo Della-Piana

1997-03-01T23:59:59.000Z

140

City of Palo Alto - Green Building Requirement (California) ...  

Open Energy Info (EERE)

Place California Name City of Palo Alto - Green Building Requirement Incentive Type Building Energy Code Applicable Sector Commercial, Multi-Family Residential, Residential...

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

City of San Jose - Photovoltaic Permit Requirements (California...  

Open Energy Info (EERE)

Jose - Solar Hot Water Heaters & Photovoltaic Systems Permit Requirements Incentive Type SolarWind Permitting Standards Applicable Sector Commercial, Construction, Industrial,...

142

Arizona -- Comparison of Commercial Building Energy Design Requirement...  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Design Requirements for Envelope and Lighting in Recent Versions of ASHRAEIESNA Standard 90.1 and the International Energy Conservation Code, with Application...

143

Customer experience requirements for e-commerce websites  

Science Conference Proceedings (OSTI)

With the emergence of highly interactive applications on the World Wide Web has come a realisation that customer engagement is an increasingly important requirements consideration. It is currently not clear, however, what kinds of requirements websites ... Keywords: aesthetics, customer experience, e-commerce, electronic commerce, heuristics, purchase intentions, requirements engineering, usability, user satisfaction, web requirements, website content, website presentation, website usability

Oscar De Bruijn; Antonella De Angeli; Alistair Sutcliffe

2007-07-01T23:59:59.000Z

144

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

145

Technical Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

146

BES Science Network Requirements  

E-Print Network (OSTI)

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

147

NSLS II: Authentication Required  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Pages Login Access to this area of the NSLS-II website requires a valid username and password. Username: Password: Next > Last Modified: April 2, 2013 Please forward all...

148

Quality Assurance requirements - Safety Analysis Reports for Packaging. An effective approach in developing QA requirements  

SciTech Connect

Application of QA requirements for packaging and transportation of radioactive materials should not be solely based on safety-related considerations. The operability of items, components, and systems must be considered as equally important. The nuclear industry has begun to recognize operability considerations along with safety concerns. This has resulted in a new approach in establishing QA requirements for packaging.

Fabian, R.R.

1986-01-01T23:59:59.000Z

149

Re: NBP RFI: Communications Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements Re: NBP RFI: Communications Requirements CTIA - The Wireless Association® ("CTIA")1 submits this response to the Department of Energy's ("DOE") Request for Information ("RFI") regarding the communications requirements of utilities pursuant to the National Broadband Plan.2 Wireless communications are a critical component of "Smart Grids" and commercial wireless networks can readily satisfy the communications requirements of Smart Grid applications. As CTIA explains below, (1) commercial wireless solutions are already meeting communications needs to implement the Smart Grid with both utility network and consumer applications; (2) commercial wireless networks" ubiquity, security and reliability support the operational requirements of Smart Grid

150

Regulators, Requirements, Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

151

VFP: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

152

BER Science Network Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

153

SULI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

154

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

155

Requirements engineering with ORM  

Science Conference Proceedings (OSTI)

The number of IT project overspends and failures suggest that many IT projects do not conform to requirements. Despite decades of development the IT industry still seems to lack an effective method of ensuring that a project will be right first time. ...

Ken Evans

2005-10-01T23:59:59.000Z

156

Requirements for Xenon International  

Science Conference Proceedings (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

157

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

158

Advanced Light Water Reactor utility requirements document  

SciTech Connect

The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document's primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

1986-06-01T23:59:59.000Z

159

NERSC Requirements Workshop November  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

160

Support Requirements for Synfuels  

E-Print Network (OSTI)

Producing synfuels from coal is technically feasible. Projects have a high probability of success but risks do exist (technical, marketing, environmental delays, regulatory and political changes, etc.). The various segments of the developing synfuels industry are identified. For each segment its characteristics, uncertainties and risks are discussed, as well as the type of support of guarantee required to develop this portion of the synfuels industry.

Hyland, M. J.

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

BER Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

162

Ridefinders Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 23 (05-92) Ridefinders Application Please submit this application to the U.S. Department of Energy (DOE) Employee Transportation Coordinator, Room 7A-156, Forrestal. U.S. Department of Energy Privacy Act Statement Check all transportation options which interest you: Carpool: Driver Share Driving Rider Vanpool: Driver Share Driving Rider Do you wish to meet your pool in your neighborhood? No (If no, see Alternate Pickup Locations below.) Yes Participation in the Federal Facility Ridesharing Program is voluntary and a private accommodation of employees rather than a Federal activity. Ridefinders Network will observe Privacy Act requirements because participation requires solicitation of personal information. The information collected will be used to maintain an accurate database of those individuals participating in the program and to provide individual ridematch lists

163

BES Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

164

DOE Challenge Home, California Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

165

Microsoft Word - Requirements_list.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

SELECTED LIST OF REQUIREMENTS SELECTED LIST OF REQUIREMENTS DESCRIPTION REQUIREMENT APPLICABILITY 1. Federal Motor Carrier Registration 49 CFR 390.19; 390.21 Motor carriers that conduct commercial motor vehicle operations in interstate commerce. 2. Hazardous Materials Safety Permit 49 CFR 385, Subpart E Motor carriers that transport the hazardous materials listed at 49 CFR 385.403. 3. Federal Hazardous Materials Registration 49 CFR 107, Subpart G Offering or transporting a hazardous material listed at 49 CFR 107.601. This list includes hazardous materials requiring placarding. 4. Texas State Motor Carrier Registration 43 TAC, Chap. 18, Subchap. B Motor carriers that conduct commercial motor vehicle operations in Texas. 5. Unified Carrier Registration 49 CFR 367 Motor carriers, motor private carriers, brokers, freight forwarders and leasing companies.

166

DOE Challenge Home, Washington Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled home. Modeling is not required, but no tradeoffs are allowed. Follow these steps to use the prescriptive path:

167

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

168

ASCR Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

169

Sample Farm Bill Application: Guide for Small Wind Applicant  

Wind Powering America (EERE)

Section 9006 Sample Small Wind Application Revised April 2007 This Sample Application is provided by the National Renewable Energy Laboratory to assist applicants in meeting requirements under the Simplified Application Process contained in 7 CFR Part 4280. This sample describes a fictional project and is meant as an example for guidance purposes only. For complete application requirements, applicants should consult the regulation. Further information is available at http://www.rurdev.usda.gov/rbs/farmbill/. This document is not officially endorsed by USDA. Table of Contents Forms, Certifications and Agreements Project specific forms: SF-424 Application for Federal Assistance 1 SF-424C Budget Information - Construction Programs 2

170

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

171

Methodology for assessing systems materials requirements  

SciTech Connect

A potential stumbling block to new system planning and design is imprecise, confusing, or contradictory data regarding materials - their availability and costs. A methodology is now available that removes this barrier by minimizing uncertainties regarding materials availability. Using this methodology, a planner can assess materials requirements more quickly, at lower cost, and with much greater confidence in the results. Developed specifically for energy systems, its potential application is much broader. This methodology and examples of its use are discussed.

Culver, D.H.; Teeter, R.R.; Jamieson, W.M.

1980-01-01T23:59:59.000Z

172

Capture and evolution of web requirements using webspec  

Science Conference Proceedings (OSTI)

Developing Web applications is a complex and time consuming process that involves different kind of people, ranging from customers to developers. Requirement artefacts play an important role as they are used by these people to perform their daily activities. ...

Esteban Robles Luna; Irene Garrigós; Julián Grigera; Marco Winckler

2010-07-01T23:59:59.000Z

173

Photovoltaic module electrical termination design requirement study  

DOE Green Energy (OSTI)

Motorola Inc., in conjunction with ITT Cannon, has conducted a study to develop information to facilitate the selection of existing, commercial, electrical termination hardware for photovoltaic modules and arrays. This volume of the report contains the executive summary. Module and array design parameters were investigated and recommendations were developed for use in surveying, evaluating, and comparing electrical termination hardware. Electrical termination selection criteria factors were developed and applied to nine generic termination types in each of the four application sectors: remote, residential, intermediate and industrial. Existing terminations best suited for photovoltaic modules and arrays were identified. Cost information was developed to identify cost drivers and/or requirements which might lead to cost reductions. The general conclusion is that there is no single generic termination that is best suited for photovoltaic application, but that the appropriate termination is strongly dependent upon the module construction and its support structure as well as the specific application sector.

Mosna, F.J. Jr.; Donlinger, J.

1980-07-01T23:59:59.000Z

174

CONTENTS RESEARCH COMPLIANCE REPORTING REQUIREMENTS PARAGRAPH  

E-Print Network (OSTI)

1. PURPOSE. This Veterans Health Administration Handbook sets forth the requirements for reporting certain research events to facility officials, relevant research review committees, and the Office of Research Oversight (ORO). NOTE: This Handbook does not preempt or otherwise alter any other applicable research reporting requirements, whether within the Department of Veterans Affairs (VA) or involving other Federal or state agencies or commercial sponsors. 2. SUMMARY OF MAJOR CHANGES. This revised VHA Handbook: a. Provides clarifications and technical corrections to the previous version of the Handbook to specify requirements for reporting certain research events to facility officials, relevant research review committees, and the ORO. b. This Handbook assigns responsibilities related to reporting research events to the ORO,

Robert A. Petzel

2010-01-01T23:59:59.000Z

175

Certification Application Templates  

Energy.gov (U.S. Department of Energy (DOE))

The application templates for each level of FPD certification mirror the competency requirements listed in the CEG. Candidates may use these to prepare their profiles in an editable format prior to...

176

Naval applications program  

SciTech Connect

This memorandum provides an discussion as to the possible application of nuclear ramjet propulsion in a submarine-based missile system. Questions are raised as to modifications required, compatibility with present submarine launch facilities, and missile and booster volume.

Hadley, J. W.

1962-06-13T23:59:59.000Z

177

Requirements dependencies: the emergence of a requirements network  

Science Conference Proceedings (OSTI)

We believe that the requirements at the leaf-node level of the requirements tree structure cannot be viewed in isolation and that dependencies between them exist. We pursued this notion in order to find a coherent set of requirement dependencies that ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

178

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

179

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

180

Application of Building Precooling to Reduce Peak Cooling Requirements  

E-Print Network (OSTI)

A building cooling control strategy was developed and tested for a 1.4 million square foot (130,000 square meter) office building located in Hoffman Estates, IL. The goal of the control strategy was to utilize building thermal mass to limit the peak cooling load for continued building operation in the event of the loss of one of the four central chiller units. The algorithm was first developed and evaluated through simulation and then evaluated through tests on two identical buildings. The east building utilized the existing building control strategy while the west building used the precooling strategy developed for this project. Consistent with simulation predictions, the precooling control strategy successfully limited the peak load to 75 % of the cooling capacity for the west building, while the east building operated at 100 % of capacity. Precooling of the building mass provided an economical alternative to the purchase of an additional chiller unit. The estimated cost of installing an additional chiller was approximately $500,000. Computer models developed for this project also showed that precooling based upon cooling cost minimization could result in savings of approximately $25,000 per month during the peak cooling season. The building model was validated with experimental results and could be used in the development of a cost minimization strategy.

Kevin R. Keeney; James E. Braun, Ph.D.

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Performance metrics for soil moisture retrievals and application requirements  

E-Print Network (OSTI)

Quadratic performance metrics such as root-mean-square error (RMSE) and time series correlation are often used to assess the accuracy of geophysical retrievals (satellite measurements) with respect to true fields. These ...

Entekhabi, Dara

182

Performance Metrics for Soil Moisture Retrievals and Application Requirements  

Science Conference Proceedings (OSTI)

Quadratic performance metrics such as root-mean-square error (RMSE) and time series correlation are often used to assess the accuracy of geophysical retrievals (satellite measurements) with respect to true fields. These metrics are related; ...

Dara Entekhabi; Rolf H. Reichle; Randal D. Koster; Wade T. Crow

2010-06-01T23:59:59.000Z

183

Step 3. Know the requirements of the applicable energy code ...  

NLE Websites -- All DOE Office Websites (Extended Search)

& Offices Consumer Information Building Energy Codes Search Search Search Help Building Energy Codes Program Home News Events About DOE EERE BTO BECP Resource Center...

184

Software Requirements Specification Verifiable Fuel Cycle Simulation (VISION) Model  

SciTech Connect

The purpose of this Software Requirements Specification (SRS) is to define the top-level requirements for a Verifiable Fuel Cycle Simulation Model (VISION) of the Advanced Fuel Cycle (AFC). This simulation model is intended to serve a broad systems analysis and study tool applicable to work conducted as part of the AFCI (including costs estimates) and Generation IV reactor development studies.

D. E. Shropshire; W. H. West

2005-11-01T23:59:59.000Z

185

Formalization and Validation of Safety-Critical Requirements  

E-Print Network (OSTI)

The validation of requirements is a fundamental step in the development process of safety-critical systems. In safety critical applications such as aerospace, avionics and railways, the use of formal methods is of paramount importance both for requirements and for design validation. Nevertheless, while for the verification of the design, many formal techniques have been conceived and applied, the research on formal methods for requirements validation is not yet mature. The main obstacles are that, on the one hand, the correctness of requirements is not formally defined; on the other hand that the formalization and the validation of the requirements usually demands a strong involvement of domain experts. We report on a methodology and a series of techniques that we developed for the formalization and validation of high-level requirements for safety-critical applications. The main ingredients are a very expressive formal language and automatic satisfiability procedures. The language combines first-order, tempor...

Cimatti, Alessandro; Susi, Angelo; Tonetta, Stefano

2010-01-01T23:59:59.000Z

186

B plant standards/requirements identification document (S/RID)  

Science Conference Proceedings (OSTI)

This Standards/Requirements Identification Document (S/RID) set forth the Environmental Safety and Health (ES{ampersand}H) standards/requirements for the B Plant. This S/RID is applicable to the appropriate life cycle phases of design, construction,operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

Maddox, B.S., Westinghouse Hanford

1996-07-29T23:59:59.000Z

187

Surveillance Guide - ENS 7.1 Definition of Design Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEFINITION OF DESIGN REQUIREMENTS DEFINITION OF DESIGN REQUIREMENTS 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's program to establish comprehensive design requirements for modifications or new installations before detailed design work commences. The Facility Representative verifies that appropriate design requirements have been established and that the contractor is complying with applicable DOE requirements. 2.0 References 2.1 DOE 4700.1, Project Management System 2.2 DOE 5700.6C, Quality Assurance 2.3 DOE 6430.1A, General Design Criteria 3.0 Requirements Implemented This surveillance implements requirement EN-0008 from the RL S/RIDs. This requirement is contained in Secretary of Energy Notice

188

PCB spill response and notification requirements  

SciTech Connect

Polychlorinated biphenyls (PCBs) are a class of organic chemicals that had become widely used in industrial applications due to their practical physical and chemical properties. Historical uses of PCBs include dielectric fluids (used in utility transformers, capacitors, etc.), hydraulic fluids, and other applications requiring stable, fire-retardant materials. Due to findings that PCBs may cause adverse health effects and due to their persistence and accumulation in the environment. The Toxic Substances Control Act (TSCA), enacted on october 11, 1976, banned the manufacture of PCBs after 1978 [Section 6(e)]. The first PCB regulations, promulgated at 40 CFR Part 761, were finalized on February 17, 1978. These PCB regulations include requirements specifying disposal methods and marking (labeling) procedures, and controlling PCB use. To assist the Department of Energy (DOE) in its efforts to comply with the TSCA statute and implementing regulations, the Office of Environmental Guidance has prepared the document ``Guidance on the Management of Polychlorinated Biphenyls (PCBs).`` That document explains the requirements specified in the statute and regulations for managing PCBs including PCB use, storage, transport, and disposal. The Environmental Protection Agency (EPA) established regulations at 40 CFR 761 Subpart G for the reporting and cleanup of spills resulting from the release of any quantity of material containing PCBs at concentrations of {ge} 50 ppm. The regulations, known collectively as the TSCA Spill Cleanup Policy, contain requirements for the notification, cleanup, decontamination verification, and recordkeeping of PCB spills. This Information Brief supplements the PCB guidance document by responding to common questions concerning PCB spill response and notification requirements. It is one of a series of Information Briefs pertinent to PCB management issues.

NONE

1994-12-01T23:59:59.000Z

189

Large Scale Computing and Storage Requirements for High Energy Physics  

NLE Websites -- All DOE Office Websites (Extended Search)

for High Energy Physics for High Energy Physics Accelerator Physics P. Spentzouris, Fermilab Motivation Accelerators enable many important applications, both in basic research and applied sciences Different machine attributes are emphasized for different applications * Different particle beams and operation principles * Different energies and intensities Accelerator science and technology objectives for all applications * Achieve higher energy and intensity, faster and cheaper machine design, more reliable operation a wide spectrum of requirements for very complex instruments. Assisting their design and operation requires an equally complex set of computational tools. High Energy Physics Priorities High energy frontier * Use high-energy colliders to discover new particles and

190

Data Requirements from NERSC Requirements Reviews Richard Gerber...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. Over the...

191

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

192

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

193

Federal Prison Industries-Requirement for Market  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH 2004-12 FLASH 2004-12 April 5, 2004 Federal A4:Quisition Circular (FAC) 2001-21 The following item is available via the internet at httQ://WWVv .acQnet.gov/farlF AC/fac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required Sources of Supplies and Services, 19, Small I~usiness Programs, 42, Contract Administration and Audit Services, and 52, Solicitation Provisions and Contract Clauses. This rule pJ'Ovides that no appropriated funds may be expended for the purchase of products or services offered by the Federal Prison Industries, Inc. (FPI), unless the agency ma1.:ing the purchase determines that the offered product or service provides the best value to the buying agency in accordance with the applicable procurement

194

API Requirements for Dynamic Graph Prediction  

SciTech Connect

Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

Gallagher, B; Eliassi-Rad, T

2006-10-13T23:59:59.000Z

195

Bethel-ASCR-Requirements-CaseStudy.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Visual Data Analysis Visual Data Analysis Computational Requirements E. Wes Bethel 5 January 2011 Oakland, CA 2 Visual Data Analysis?  Visualization: transformation of data into images.  Visual data analysis: * Reflects one of three different visualization use models: * Exploratory, analytical, presentation. www.vacet. org Map of the Problem Space Experiment Simulation Data Analysis Results Filter, feature detection, search, subset, transform, visualize. Images, movies, data, decisions, knowledge. Raw data files, metadata, location transparency, single project, community repositories. Workflow High Performance I/O Libraries, Data Models Berkeley Lab Visualization Group Mission  Enable scientific knowledge discovery through the research, development, deployment, and application of visual data

196

Defining Requirements for Improved Photovoltaic System Reliability  

DOE Green Energy (OSTI)

Reliable systems are an essential ingredient of any technology progressing toward commercial maturity and large-scale deployment. This paper defines reliability as meeting system fictional requirements, and then develops a framework to understand and quantify photovoltaic system reliability based on initial and ongoing costs and system value. The core elements necessary to achieve reliable PV systems are reviewed. These include appropriate system design, satisfactory component reliability, and proper installation and servicing. Reliability status, key issues, and present needs in system reliability are summarized for four application sectors.

Maish, A.B.

1998-12-21T23:59:59.000Z

197

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by students who start during or after the Spring 2012 semester is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

198

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

199

Humidity requirements in WSCF Laboratories  

SciTech Connect

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

200

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Incentives as a Tool for Stimulating PV Market Growth  

SciTech Connect

This paper summarizes several studies analyzing consumer incentives for the grid-tied domestic photovoltaic (PV) market.

Herig, C.

2000-01-01T23:59:59.000Z

202

Home: Directives, Delegations, and Requirements  

NLE Websites -- All DOE Office Websites

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

203

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

204

The Practice of Parking Requirements  

E-Print Network (OSTI)

the cost of the required parking is thus $20 per square foot$40 per square foot of floor area, or twice the cost in aper 1,000 square feet in a TOD, and the developer's cost of

Shoup, Donald C.

2006-01-01T23:59:59.000Z

205

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

206

Physics and detector simulation requirements  

Science Conference Proceedings (OSTI)

‘‘This document describes the computing environment needed to meet the requirements for high energy physics Monte Carlo Calculations for the simulation of Superconducting Super Collider Laboratory physics and detectors.’’ (AIP)

Computer Acquisition Working Group

1990-01-01T23:59:59.000Z

207

SofTV Viewer Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

may be required to view all features in a presentations where build steps and animations are published. (This feature can be turned off) Netscape 7.1+ Presentations created...

208

OpenEI - land requirements  

Open Energy Info (EERE)

en.openei.orgdatasetstaxonomyterm4180 en Land use requirements for ground-mounted solar power facilities. http:en.openei.orgdatasetsnode454

This dataset is part of...

209

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

210

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

211

Tank waste remediation system functions and requirements document  

Science Conference Proceedings (OSTI)

This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.

Carpenter, K.E

1996-10-03T23:59:59.000Z

212

OMB Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB Requirements OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information

213

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

214

Stellar Astrophysics Requirements NERSC Forecast  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements for Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis (Munich), Andrzej Odrzywolek (Cracow), Ju Zhang (FIT), Andrey Zhiglo (Kharkov) 1. m461: Stellar Explosions in Three Dimensions * Summarize your projects and expected scientific objectives through 2014 * Modeling and simulations of transient phenomena in stellar astrophysics driven by either radiation or thermonuclear processes * Numerical solution of a coupled system of PDEs and ODEs * Tame nonlinearity! * Our goal is to ... * Explain observed properties of exploding stellar objects * Present focus is ... * Neutrino-driven core-collapse supernova explosions * In the next 3 years we expect to ...

215

New Solutions Require New Thinking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions Require Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication systems * Demand response programs Reducing Peak Demand The RDSI program aims to reduce peak load on distribution feeders 20% by 2015. To help achieve this goal, RDSI is sponsoring demonstration projects nationwide. From California to New York, these projects are

216

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

217

Parameter estimation for performance models of distributed application systems  

Science Conference Proceedings (OSTI)

The performance engineering of distributed applications requires models that capture contention for both hardware and software resources. Layered queueing models have been proposed for modeling distributed applications but they require model parameters ...

Jerome Rolia; Vidar Vetland

1995-11-01T23:59:59.000Z

218

POTENTIAL REQUIREMENTS FOR FISSION PRODUCTS AS HEAT AND RADIATION SOURCES  

SciTech Connect

An outline is presented of the potential applications and quantity requiremerts of fission products for the period 1964 to 1968. These applications include military, governmert, and civilian heat sources; irradiation processing; and food irradiation. The potential requirements for 1964 to 1968 are 273 MC / sup 90/Sr and 351 MC /sup 137/Cs. An evaluation is made of the applications of heat-producing isotopes in Coast Guard navigational buoys, lights, and beacons; undersea electronic systems; and weather stations. Costs were determined for conventional methods of power generation and compared to radioisotope power generation. Fuel requiremerts and break-even fuel costs for isotopic power are tabulated. (D.L.C.)

1964-01-01T23:59:59.000Z

219

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Neutron Source Network Requirements Six DOE laboratories arehas networking requirements which differ from many other DOEhas networking requirements which differ from many other DOE

2006-01-01T23:59:59.000Z

220

ALLOCATION OF REACTIVE SUPPORT REQUIREMENTS  

E-Print Network (OSTI)

the voltage setting point s kV of each bus Qk and the voltage profile for the buses c j Q . Recall that Q for these transactions so that all bus voltages meet the specified voltage profile requirements. Consequently load is locally met at the bus. In other words, we assume that at each load bus the power factor is 1

Gross, George

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Energy Efficiency and Conservation Requirements for Utilities | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Energy Efficiency and Conservation Requirements for Utilities Energy Efficiency and Conservation Requirements for Utilities < Back Eligibility Investor-Owned Utility Savings Category Other Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State Pennsylvania Program Type Energy Efficiency Resource Standard Provider Pennsylvania Public Utilities Commission In October 2008 Pennsylvania adopted Act 129, creating energy efficiency and conservation requirements for the state's investor owned utilities with at least 100,000 customers. With this limitation on applicability, the standards apply only to the following utilities: PECO Energy, PPL Electric Utilities, West Penn Power, Pennsylvania Electric (Penelec), Metropolitan

222

Guidelines for Control Center Application Program Interfaces  

Science Conference Proceedings (OSTI)

Applying the interoperability concept to the utility control center requires application program interfaces (API) for energy management systems (EMS). This report contains guidelines for achieving plug compatibility of application programs in the control center EMS.

1996-07-02T23:59:59.000Z

223

Microsoft Word - SWPAInterconnectionRequirements_063009.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Southwestern Power Administration Southwestern Power Administration GENERAL REQUIREMENTS FOR INTERCONNECTION Division of Customer Service Revision Effective Date By Summary of Changes 1.0 6/17/2008 Aiden Smith Document transferred ownership to the Division of Customer Service for future updates and revisions. Various modifications were made to update the document to current practice and to accommodate applicable provisions of Southwestern's Open Access Transmission Tariff (Tariff). 2.0 10/27/2008 Aiden Smith Revised Section 2.0, Step 5 and Section 3.5 to provide for advanced funds only when Southwestern acquires the land and to rearrange land acquisition provisions for increased clarity. 3.0 6/30/2009 Aiden Smith Revised title page to include document ownership and revision box. Revised Section 1.2 to

224

Requirements Flowdown and Graded Approach to QA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Graded Approach Model and Expectation Graded Approach Model and Expectation Page 1 of 18 Office of Environmental Management And Energy Facility Contractors Group Quality Assurance Improvement Project Plan Project Focus Area Task # and Description Deliverable Project Area 1: Requirements Flow Down Task #1.9 - Complete White Paper covering procurement QA process flow diagram Draft White Paper and Amended Flow Diagram Project Area 4: Graded Approach Implementation Task #4.4 - In coordination with Project Focus Area #1, provide an EM expectation for application of the graded approach to procurement. EM Graded Approach Procedure for Procurements Approvals: Yes/No/NA Project Managers: S. Waisley, D. Tuttel Y Executive Committee: D. Chung, J. Yanek, N. Barker,

225

EPA streamlines requirements for universal wastes  

SciTech Connect

The Universal Waste rule issued Feb. 11, 1993, fosters the recycling of certain universal wastes typically discarded by consumers. Because these wastes are disposed of from households, they are excluded from hazardous waste regulation under the Resource Conservation and Recovery Act (RCRA). However, any commercial entity that accepts these wastes is subject to full RCRA regulation. Hence, there has been little incentive to recycle these wastes. U.S. Environmental Protection Agency (EPA) has concluded certain universal wastes are hazardous and are predominantly generated in municipal settings both household and commercial. These wastes could benefit from and safely be managed under a regulatory scheme less burdensome than the full RCRA Subtitle C program now applicable to these waters. The Universal Waste rule proposes requirements for used nickel-cadmium and small, sealed lead-acid batteries and canceled pesticides. The Agency is considering expanding the scope of the rule to other forms of universal wastes, including antifreeze and light bulbs.

Bryant, C. (Technical Group Inc., Washington, DC (United States))

1993-07-01T23:59:59.000Z

226

Plug-in Electric Vehicle to Grid Interface Requirements  

Science Conference Proceedings (OSTI)

This document provides technical requirements to ensure that plug-in electric vehicles (PEVs) will be designed for electric grid compatibility. It organizes the applicable current and future standards in an overview format, as well as providing a context as to the importance and usefulness of these standards to the utility industry.

2009-12-08T23:59:59.000Z

227

2004 WIPP Compliance Recertification Application  

NLE Websites -- All DOE Office Websites (Extended Search)

2004 WIPP Compliance Recertification Application DOEWIPP 04-3231 March 2004 Content of the CRA As required by Title 40 CFR, Parts 191 and 194, the 2004 Compliance Recertification...

228

Quality Assurance Requirements and Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QjCivilianRadioactive QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160 Successful implementation of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance (QA) program is essential for the OCRWM to carry out its mission. Our mission is to manage and dispose ofbigh-Ievel radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits

229

Nano-science Safety Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-science Safety Requirements Effective Date 12/6/2011 Nano-science Safety Requirements Effective Date 12/6/2011 The only official copy of this file is the one on-line. Before using a printed copy, verify that it is the most current version by checking the effective date. Page 1 of 3 Prepared By: L. Stiegler Low Risk - Embedded or Fixed Nanostructures (nanomaterials, incapable as a practical matter, of becoming airborne) Ensure that fixed nanomaterials are not subjected to actions that may generate Unbound NanoParticles (UNP). * For work outside of a HEPA filtered exhaust hood: o No Mechanical stresses e.g., (grinding, scraping, or pressing). o No thermal stresses o Cover samples when practical e.g., (slide cover, Kapton tape, Mylar tape, or cellophane tape). Samples/container must be labeled if not used immediately.

230

Requirements for signaling channel authentication  

SciTech Connect

This contribution addresses requirements for ATM signaling channel authentication. Signaling channel authentication is an ATM security service that binds an ATM signaling message to its source. By creating this binding, the message recipient, and even a third party, can confidently verify that the message originated from its claimed source. This provides a useful mechanism to mitigate a number of threats. For example, a denial of service attack which attempts to tear-down an active connection by surreptitiously injecting RELEASE or DROP PARTY messages could be easily thwarted when authenticity assurances are in place for the signaling channel. Signaling channel authentication could also be used to provide the required auditing information for accurate billing which is impervious to repudiation. Finally, depending on the signaling channel authentication mechanism, end-to-end integrity of the message (or at least part of it) can be provided. None of these capabilities exist in the current specifications.

Tarman, T.D.

1995-12-11T23:59:59.000Z

231

Functional Requirements and Use Cases  

E-Print Network (OSTI)

iously also beneficial in information systems development, staging core functionality for early releases and adding features over the course of several subsequent releases. In many industries, companies produce product lines with different cost/feature variations per product in the line, and product families that include a number of product lines targeted at somewhat different markets or usage situations. What makes these product lines part of a family, are some common elements of functionality and identity. A platform-based development approach leverages this commonality, utilizing a set of reusable assets across the family. These strategies have important implications for software architecture. In particular, it is not just the functional requirements of the first product or release that must be supported by the architecture. The functional requirements of early (nearly concurrent) releases need to be explicitly taken into account. Later releases are accommodated through architectu

System Has Properties; Ruth Malan; Dana Bredemeyer

2005-01-01T23:59:59.000Z

232

Evaluate deaerator steam requirements quickly  

Science Conference Proceedings (OSTI)

Steam plant engineers frequently have to perform energy balance calculations around the deaerator to estimate the steam required to preheat and deaerate the make-up water and condensate returns. This calculation involves solving two sets of equations, one for mass and the other for energy balance. Reference to steam tables is also necessary. However, with the help of this program written in BASIC, one can arrive at the make-up water and steam requirements quickly, without referring to steam tables. This paper shows the mass and energy balance equations for the deaerator. This paper gives the program listing. An number of condensate returns can be handled. An example illustrates the use of the program.

Ganapathy, V. (ABCO Industries, Inc., Abilene, TX (US))

1991-02-01T23:59:59.000Z

233

Present and Future Computing Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computational Cosmology for Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical Program Review November 27-28, 2012

234

Residential photovoltaic module and array requirements study. Final report  

SciTech Connect

Burt Hill Kosar Rittelmann Associates has conducted a study to identify design requirements for photovoltaic modules and arrays used in residential applications. Building codes and referenced standards were reviewed for their applicability to residential photovoltaic array installations. Four installation types were identified - integral (replaces roofing), direct (mounted on top of roofing), stand-off (mounted away from roofing), and rack (for flat or low slope roofs, or ground mounted). Installation costs were developed for these mounting types as a function of panel/module size. cost drivers were identified. Studies were performed to identify optimum module shapes and sizes and operating voltage cost drivers. The general conclusion is that there are no perceived major obstacles to the use of photovoltaic modules in residential arrays. However, there is no applicable building code category for residential photovolttaic modules and arrays and early additional work is needed with standards writing organizations to develop residential module and array requirements.

1979-06-01T23:59:59.000Z

235

SSN comments to DOE NBP RFI communications requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comms Requirements Comms Requirements 12 July 2010 1/6 Michael Jung // Policy Director // Silver Spring Networks 888.406.1882 // mjung@silverspringnet.com (1) What are the current and future communications needs of utilities, including for the deployment of new Smart Grid applications, and how are these needs being met? Utilitiesʼ current communications needs are diverse, with considerable variation from utility to utility. Current communications needs that are related to, but generally pre-date, smart grid include: * System control and data acquisition (SCADA) * Drive-by meter reading * One-way direct load control * Mobile workforce management * Demand response, dynamic pricing for commercial/industrial customers In the smart grid-enabled future, utility smart grid applications will require

236

A UI-Driven lightweight framework for developing web applications  

Science Conference Proceedings (OSTI)

Due to the increasing complexity of Web applications, systematic processes and supporting tools are required for the development of Web applications. In this paper, we propose a UI-driven lightweight framework for building Web applications. This framework ...

Keeyoull Lee; Sanghyun Park; Chunwoo Lee; Woosung Jung; Wookjin Lee; Byungjeong Lee; Heechern Kim; Chisu Wu

2005-07-01T23:59:59.000Z

237

Seismic Performance Requirements for WETF  

Science Conference Proceedings (OSTI)

This report develops recommendations for requirements on the Weapons Engineering Tritium Facility (WETF) performance during seismic events. These recommendations are based on fragility estimates of WETF structures, systems, and components that were developed by LANL experts during facility walkdowns. They follow DOE guidance as set forth in standards DOE-STD-1021-93, ''Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components'' and DOE-STD-1020-94, ''Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities''. Major recommendations are that WETF institute a stringent combustible loading control program and that additional seismic bracing and anchoring be provided for gloveboxes and heavy equipment.

Hans Jordan

2001-01-01T23:59:59.000Z

238

Outlook and Related Information Requirements  

E-Print Network (OSTI)

This procedure provides the steps required for market participants to submit the information required for the 18-Month Outlook, and specifies the information to be contained in the Outlook. Public Disclaimer The posting of documents on this Web site is done for the convenience of market participants and other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all posted documents conform to the original, changes can result from the original, including changes resulting from the programs used to format the documents for posting on the Web site as well as from the programs used by the viewer to download and read the documents. The IESO makes no representation or warranty, express or implied, that the documents on this Web site are exact reproductions of the original documents listed. In addition, the documents and information posted on this Web site are subject to change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion without further notice. It is solely your responsibility to ensure that you are using up-to-date documents and information.

unknown authors

2001-01-01T23:59:59.000Z

239

HTS applications  

E-Print Network (OSTI)

Superconductivity has found many attractive applications in medicine, science, power systems, engineering, transport and electronics. One of the most prominent applications of superconductivity are superconducting magnets e.g. MRI magnets, NMR magnets, accelerator magnets, and magnets for fusion; most applications still use low temperature superconductors. Since the discovery of high temperature superconductivity (HTS) in 1986 there has been a tremendous progress in R&D of HTS material, wires and applications. Especially for power system applications, HTS offers considerable economic benefits. Many HTS demonstrator or prototype applications have been built and successfully tested, and some HTS applications like cables and superconducting fault current limiters seem very close to commercialisation. This paper gives an overview about the present and future HTS applications in power applications, high field magnets and current leads. In addition results of the Forschungszentrum Karlsruhe program to develop H...

Noe, M; Fietz, W H; Goldacker, W; Schneider, Th

2009-01-01T23:59:59.000Z

240

DOE Challenge Home National Program Requirements (Rev. 03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Program Requirements (Rev. 03) National Program Requirements (Rev. 03) April 17, 2013 Effective for Homes Revised April 17, 2013 Page 1 of 8 Permitted Starting 6/17/2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Microsoft Word - Requirements 0819.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Studying the ) DOE-HQ-2009-0003-0819 Studying the ) DOE-HQ-2009-0003-0819 Communications Requirements of Electric ) (Noticed May 11, 2010) Utilities to Inform Federal Smart Grid Policy ) ) Comments of San Diego Gas & Electric Company San Diego Gas & Electric Company ("SDG&E") files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern California Gas

242

Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor  

SciTech Connect

The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor`s (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor`s management plan.

Beckman, W.H.; Cossel, S.C.; Alhadeff, N. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Porco, D.J. [Jacobs Engineering Co., Pasadena, CA (United States); Lindamood, S.B. [Jacobs Engineering Co., Pasadena, CA (United States); Beers, J.A. [Fluor Daniel Corp. (United States)

1993-10-01T23:59:59.000Z

243

A Requirements Analyst's Apprentice: A Proposal  

E-Print Network (OSTI)

The Requirements Analyst's APprentice (RAAP) partially automates the modeling process involved in creating a software requirement. It uses knowledge of the specific domain and general experience regarding software requirements ...

Reubenstein, Howard

244

PDF Application  

Science Conference Proceedings (OSTI)

?Computer Applications and Process Control. ?Copper Nickel and Cobalt ... ? Iron and Steel. ?Joining. ?Lead Zinc and Tin. ?Lightweight Materials.

245

Technologies Applications  

E-Print Network (OSTI)

evaporation systems n Potential mining applications (produced water) nIndustry applications for which silicaLicensable Technologies Applications: n Cooling tower systems n Water treatment systems n Water needed n Decreases the amount of makeup water and subsequent discharged water (blowdown) n Enables

246

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses, Supervisory Essentials and Navigating the Federal Hiring Process are required to fulfill the first 40-hour of the probationary period mandatory training requirement for new supervisors. All other courses listed in the training framework are suggested to meet overall continual learning requirements. Supervisory Training Requirements More Documents & Publications EM's Development Program for New Managers/Supervisors Presentation DOE F 3315.1 Supervisory - Non-Supervisory Employee Performance Management and

247

Cold vacuum drying facility design requirements  

SciTech Connect

This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

IRWIN, J.J.

1999-07-01T23:59:59.000Z

248

ALS Beamline Design Requirements - Revision 1  

E-Print Network (OSTI)

the beamline including: • Electrical power requirements e.at the ALS include: • Electrical power: 480VAC, 208VAC, 120terminations, and electrical power requirements. Beamline

Heimann, Phil

2010-01-01T23:59:59.000Z

249

Alternative Fuels Data Center: Petroleum Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Petroleum Reduction Petroleum Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Petroleum Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Petroleum Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Petroleum Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Petroleum Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Petroleum Reduction Requirements The Wisconsin Department of Administration's fleet management policy

250

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

251

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental...

252

Federal Energy Management Program: Federal Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Requirements to someone by E-mail Share Federal Energy Management Program: Federal Requirements on Facebook Tweet about Federal Energy Management Program: Federal...

253

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Requirements by Subject to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Subject on Facebook Tweet about Federal...

254

National Bridge Inventory Record Data Submission Requirement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement 2011.09.02 OECM-NBI Record Data Submission Req.pdf More...

255

NERSC/DOE HEP Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 High Energy Physics (HEP) Logistics Workshop Logistics Workshop Location Hilton Washington...

256

Renewable Generation Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Requirement Renewable Generation Requirement Eligibility Investor-Owned Utility Retail Supplier Savings For Bioenergy Buying & Making Electricity Water Solar Heating &...

257

Studying the Communications Requirements of Electric Utilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities...

258

Communications Requirements of Smart Grid Technologies | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communications Requirements of Smart Grid Technologies Communications Requirements of Smart Grid Technologies This report sets forth the findings of the U.S. Department of Energy...

259

Partnership Requirements: ENERGY STAR Partnership for Commercial &  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: ENERGY STAR Partnership for Commercial Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition

260

Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the US Code of Federal Regulations as codified on December 31, 1991  

SciTech Connect

This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the Code of Federal Regulations, Chapter I, on December 31, 1991. It also includes, in a separate section, any of those requirements that were superseded or discontinued from January through December 1991. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation.

Collins, M.; Shelton, B.

1992-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements  

E-Print Network (OSTI)

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements 1 Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 6000BSE RG 6412 NUCLEAR ENGINEERING no exceptions here) RG 6521 NUCLEAR ENGINEERING AND RADIOLOGICAL SCIENCES RESIDENCY, GPA REQUIREMENTS Effective

Shyy, Wei

262

A systematic review of security requirements engineering  

Science Conference Proceedings (OSTI)

One of the most important aspects in the achievement of secure software systems in the software development process is what is known as Security Requirements Engineering. However, very few reviews focus on this theme in a systematic, thorough and unbiased ... Keywords: Requirements engineering, Secure development, Security, Security engineering, Security requirements, Security requirements engineering, Systematic review

Daniel Mellado; Carlos Blanco; Luis E. Sánchez; Eduardo Fernández-Medina

2010-06-01T23:59:59.000Z

263

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

throughout the city. In California, one solar-coveredcommuters’ electric cars. California requires that, by 2025,

Shoup, Donald

2012-01-01T23:59:59.000Z

264

Managing Water Resource Requirements for Growing Electric Generation Demands  

Science Conference Proceedings (OSTI)

This report is a general guide to analytical techniques used to address water resource management as related to long-term sustainability planning, and short-term regulatory requirements, including total maximum daily loads, endangered species, and relicensing of hydropower facilities. The example applications presented in the report highlight the capability of the techniques, and help electric power company and government regulatory staffs identify the best approach for a specific need.

2009-12-02T23:59:59.000Z

265

CARS Control Anomaly Recognition System: System Concept, Requirements, and Specifications  

Science Conference Proceedings (OSTI)

This report presents results of an initial study aimed at defining the system concept, principal requirements, and functional specification for a control anomaly recognition system (CARS) software tool. The purpose of the CARS software system is to assist nuclear power plant operators in the early detection of faults and anomalies in plant control systems before they cause reactor scrams or component damage. The diagnostic capability technology of CARS can support other process industries' applications b...

2002-04-12T23:59:59.000Z

266

Ceramics for fusion applications  

SciTech Connect

Ceramics are required for a variety of uses in both near-term fusion devices and in commercial powerplants. These materials must retain adequate structural and electrical properties under conditions of neutron, particle, and ionizing irradiation; thermal and applied stresses; and physical and chemical sputtering. Ceramics such as Al/sub 2/O/sub 3/, MgAl/sub 2/O/sub 4/, BeO, Si/sub 3/N/sub 4/ and SiC are currently under study for fusion applications, and results to date show widely-varying response to the fusion environment. Materials can be identified today which will meet initial operating requirements, but improvements in physical properties are needed to achieve satisfactory lifetimes for critical applications.

Clinard, F.W. Jr.

1986-01-01T23:59:59.000Z

267

The emergence of requirements networks: the case for requirements inter-dependencies  

Science Conference Proceedings (OSTI)

Do system requirements depend on each other? Or, do system requirements live in an isolated world of their own and act independently by being completely oblivious to the presence of other requirements? Since a singular requirement does ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

268

Photovoltaic module electrical termination design requirement study. Final report  

DOE Green Energy (OSTI)

Motorola Inc., in conjunction with ITT Cannon, has conducted a study to develop information to facilitate the selection of existing, commercial, electrical termination hardware for photovoltaic modules and arrays. Details of the study are presented in this volume. Module and array design parameters were investigated and recommendations were developed for use in surveying, evaluating, and comparing electrical termination hardware. Electrical termination selection criteria factors were developed and applied to nine generic termination types in each of the four application sectors. Remote, residential, intermediate and industrial. Existing terminations best suited for photovoltaic modules and arrays were identified. Cost information was developed to identify cost drivers and/or requirements which might lead to cost reductions. The general conclusion is that there is no single generic termination that is best suited for photovoltaic application, but that the appropriate termination is strongly dependent upon the module construction and its support structure as well as the specific application sector.

Mosna, F.J. Jr.; Donlinger, J.

1980-07-01T23:59:59.000Z

269

Repository disposal requirements for commercial transuranic wastes (generated without reprocessing)  

SciTech Connect

This report forms a preliminary planning basis for disposal of commercial transuranic (TRU) wastes in a geologic repository. Because of the unlikely prospects for commercial spent nuclear fuel reprocessing in the near-term, this report focuses on TRU wastes generated in a once-through nuclear fuel cycle. The four main objectives of this study were to: develop estimates of the current inventories, projected generation rates, and characteristics of commercial TRU wastes; develop proposed acceptance requirements for TRU wastes forms and waste canisters that ensure a safe and effective disposal system; develop certification procedures and processing requirements that ensure that TRU wastes delivered to a repository for disposal meet all applicable waste acceptance requirements; and identify alternative conceptual strategies for treatment and certification of commercial TRU first objective was accomplished through a survey of commercial producers of TRU wastes. The TRU waste acceptance and certification requirements that were developed were based on regulatory requirements, information in the literature, and from similar requirements already established for disposal of defense TRU wastes in the Waste Isolation Pilot Plant (WIPP) which were adapted, where necessary, to disposal of commercial TRU wastes. The results of the TRU waste-producer survey indicated that there were a relatively large number of producers of small quantities of TRU wastes.

Daling, P.M.; Ludwick, J.D.; Mellinger, G.B.; McKee, R.W.

1986-06-01T23:59:59.000Z

270

PETSc: Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications and Publications Applications and Publications Home Download Features Documentation Applications/Publications Prizes Industrial/DOE sites DOE CSGF users Miscellaneous External Software Developers Site These are publications on application simulations developed by PETSc users. Please send us information about your publications, petsc-maint@mcs.anl.gov. How to cite PETSc in your publications. See Acknowledgments for software packages that PETSc uses. PETSc has been used for modeling in all of these areas: Acoustics, Aerodynamics, Air Pollution, Arterial Flow, Bone Fractures, Brain Surgery, Cancer Surgery, Cancer Treatment, Carbon Sequestration, Cardiology, Cells, CFD, Combustion, Concrete, Corrosion, Data Mining, Dentistry, Earth Quakes, Economics, Fission, Fusion, Glaciers, Ground Water Flow, Linguistics,

271

Application: Electronics  

Science Conference Proceedings (OSTI)

Application: Electronics. ... Suppression of Electrical Cable Fires: Development of a Standard PVC Cable Fire Test for ISO 14520-1.. Robin, ML ...

2011-12-22T23:59:59.000Z

272

brochure application  

Science Conference Proceedings (OSTI)

Magnetohydrodynamics. 19. Measurement Techniques for Pot Analysis ... Country ... Be sure to note your personal topics of interest on the application because ...

273

Selected Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

274

Part B - Requirements & Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B - Requirements & Funding Information B - Requirements & Funding Information PART B - Requirements & Funding Information .......................................................................................... 2 PART B - Requirements & Funding Information B.1. Purpose This Part of the IA (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting Agency' sufficient to demonstrate a bona fide need and identifies funds associated with the requirement to allow [insert the name of agency/organization that will provide acquisition services for the Department of Energy], hereinafter 'the Servicing Agency,' to provide acquisition assistance and conduct an interagency acquisition.

275

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial vehicle or gasoline powered vehicle may not idle for more than five minutes during any 60-minute period. Exemptions are allowed for the

276

Alternative Fuels Data Center: Biodiesel Warranty Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Warranty Warranty Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Warranty Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Warranty Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Warranty Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Warranty Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Warranty Requirement All new state government diesel vehicles must have a manufacturer's warranty that allows the use of biodiesel blends of 20% (B20) in the

277

Alternative Fuels Data Center: Biofuels Blender Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Blender Biofuels Blender Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Blender Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Blender Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Blender Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Blender Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Blender Requirements Blenders of ethanol and gasoline and biodiesel and diesel fuels outside of the bulk transfer terminal system must obtain a blender's license and are

278

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A gasoline-fueled motor vehicle is not allowed to operate for more than three consecutive minutes when the vehicle is not in motion, with the

279

Alternative Fuels Data Center: Emissions Control Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Control Emissions Control Requirement to someone by E-mail Share Alternative Fuels Data Center: Emissions Control Requirement on Facebook Tweet about Alternative Fuels Data Center: Emissions Control Requirement on Twitter Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Google Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Delicious Rank Alternative Fuels Data Center: Emissions Control Requirement on Digg Find More places to share Alternative Fuels Data Center: Emissions Control Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Control Requirement Heavy-duty diesel vehicles used to perform federally funded state public works contracts must be powered by engines with Level 3 emissions control

280

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A diesel- or gasoline-powered motor vehicle may not idle for more than three consecutive minutes, except under the following conditions: 1) to

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Motor fuel containing more than 1% ethanol or methanol may not be sold or offered for sale from a motor fuel dispenser unless the individual selling

282

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 20% of all diesel fuel used to fuel state agency vehicles, vessels, and construction equipment must be biodiesel. The Washington

283

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles licensed for commercial or public service may not idle for more than three minutes in commercial or residential urban areas, unless

284

Alternative Fuels Data Center: Biodiesel Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Labeling Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Labeling Requirement Biodiesel fuel retailers may not advertise or offer for sale fuel labeled as pure biodiesel unless the fuel contains no other type of petroleum

285

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Idling of any unattended vehicle is prohibited in Utah. Violators are subject to a penalty of up to $750 and/or up to 90 days imprisonment.

286

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement On-road heavy-duty motor vehicles with a gross vehicle weight rating of 8,500 pounds or greater may not idle for more than three consecutive

287

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle may not idle for more than five consecutive minutes. This regulation does not apply to: 1) vehicles being serviced, provided that

288

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Vehicle operators may not idle any commercial diesel vehicle with a gross vehicle weight rating of more than 10,000 pounds for more than 10 minutes

289

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement All diesel-powered motor vehicles, light trucks, and equipment owned or leased by a state agency must operate using diesel fuel that contains a

290

Alternative Fuels Data Center: Ethanol Blend Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Blend Ethanol Blend Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Blend Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Blend Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Blend Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Blend Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Blend Requirement Suppliers that import gasoline for sale in North Carolina must offer fuel that is not pre-blended with fuel alcohol but that is suitable for future

291

Alternative Fuels Data Center: Propane Supplier Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane Supplier Propane Supplier Requirements to someone by E-mail Share Alternative Fuels Data Center: Propane Supplier Requirements on Facebook Tweet about Alternative Fuels Data Center: Propane Supplier Requirements on Twitter Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Google Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Delicious Rank Alternative Fuels Data Center: Propane Supplier Requirements on Digg Find More places to share Alternative Fuels Data Center: Propane Supplier Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Propane Supplier Requirements A retail supplier may only distribute liquefied petroleum gas (LPG or propane) if the supplier holds a license from the Wisconsin Department of

292

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement School bus operators may not idle a school bus engine for more than three consecutive minutes except under the following conditions: uncontrollable

293

Alternative Fuels Data Center: Biofuels Feedstock Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Feedstock Biofuels Feedstock Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Feedstock Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Feedstock Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Feedstock Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Feedstock Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Feedstock Requirements Renewable fuel production plants operating in Louisiana and deriving ethanol from the distillation of corn must use corn crops harvested in

294

Alternative Fuels Data Center: Biofuels Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Use Biofuels Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuels Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuels Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuels Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuels Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Use Requirement State-owned diesel-powered vehicles and equipment must use a biodiesel blend that contains at least 2% biodiesel (B2), where available, as long as

295

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial motor vehicle with a gross vehicle weight rating of 10,000 pounds or more may not idle for more than 15 minutes in any 60-minute

296

Alternative Fuels Data Center: Tire Inflation Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Tire Inflation Tire Inflation Requirement to someone by E-mail Share Alternative Fuels Data Center: Tire Inflation Requirement on Facebook Tweet about Alternative Fuels Data Center: Tire Inflation Requirement on Twitter Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Google Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Delicious Rank Alternative Fuels Data Center: Tire Inflation Requirement on Digg Find More places to share Alternative Fuels Data Center: Tire Inflation Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Tire Inflation Requirement The California Air Resources Board (ARB) enforces regulations to reduce greenhouse gas emissions from vehicles operating inefficiently with under

297

Alternative Fuels Data Center: Biofuel Use Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Use Biofuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirements To reduce fossil fuel dependence and statewide greenhouse gas emissions, New Jersey state departments, agencies, offices, universities, and colleges

298

Alternative Fuels Data Center: Biodiesel Producer Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Producer Biodiesel Producer Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Producer Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Producer Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Producer Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Producer Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Producer Requirements Biodiesel is defined as a fuel that is composed of mono-alkyl esters of long-chain fatty acids derived from plant or animal matter, meets the

299

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle for more than five minutes from April through October in cities and counties where the local government has signed a

300

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A driver may not idle a vehicle on a roadway outside a business or residential district when it is practical to stop and park the vehicle. A

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Alternative Fuels Data Center: Biodiesel Sales Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Sales Biodiesel Sales Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Sales Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Sales Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Sales Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Sales Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Sales Requirements It is unlawful for any person to sell, offer for sale, assist in the sale of, deliver, or permit to be sold or offered for sale any biodiesel,

302

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle at a loading zone, parking or service area, route terminal, or other off-street areas, except for the following situations:

303

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle engine may not operate for more than five consecutive minutes when the vehicle is not in motion, with the following exceptions:

304

Alternative Fuels Data Center: Idle Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirements Effective May 1, 2014, a driver may not idle his or her motor vehicle for more than five minutes in a 60-minute period. This limit does not apply if

305

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel vehicles with a gross vehicle weight rating over 10,000 pounds may not idle for more than five minutes in any continuous 60 minute period.

306

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement The owner or operator of a diesel powered vehicle must limit the length of time their vehicle remains idle. The limit is based on the outside

307

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Any motor vehicle fuel sold at retail containing more than 1% ethanol or methanol must be labeled according to Connecticut Department of Consumer

308

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles may not idle unnecessarily for longer than five consecutive minutes during any 60-minute period. This includes heavy-duty diesel

309

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel truck or bus engines may not idle for more than 15 consecutive minutes. Exemptions apply to diesel trucks or buses for which the Nevada

310

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement All gasoline containing 1% or more ethanol by volume offered for sale must be conspicuously identified as "with ethanol" or "containing ethanol."

311

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A person that operates a diesel powered motor vehicle in certain counties and townships may not cause or allow the motor vehicle, when it is not in

312

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 75% of the Missouri Department of Transportation (MoDOT) vehicles and heavy equipment that use diesel fuel must be fueled with biodiesel

313

Alternative Fuels Data Center: Biofuel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Use Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirement State agencies must take all reasonable actions to develop the infrastructure necessary to increase the availability and use of E85 and biodiesel throughout the state. Employees using state-owned vehicles are

314

Mobile IP Authentication, Authorization, and Accounting Requirements  

Science Conference Proceedings (OSTI)

The Mobile IP and Authentication, Authorization, Accounting (AAA) working groups are currently looking at defining the requirements for Authentication, Authorization, and Accounting. This document contains the requirements which would have to be supported ...

S. Glass; T. Hiller; S. Jacobs; C. Perkins

2000-10-01T23:59:59.000Z

315

Salt Lake City- High Performance Buildings Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

316

Business System Planning Project System Requirements Specification  

SciTech Connect

The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

NELSON, R.E.

2000-09-08T23:59:59.000Z

317

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Network Requirements for ESnet Update to the 2002 Office ofNetwork Requirements for ESnet Update to the 2002 Office ofEdited by Eli Dart, ESnet Engineering Staff dart@es.net

2006-01-01T23:59:59.000Z

318

Functions and Requirements for the Transition Project  

SciTech Connect

This document describes the functional requirement baseline for the Transition of 100 K Area Facilities Project (Transition Project). This baseline information consists of top-level functions, requirements, concept description, interface description, issues, and enabling assumptions.

YANOCHKO, R.M.

2000-04-24T23:59:59.000Z

319

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Update to the 2002 Office of Science Networking RequirementsUpdate to the 2002 Office of Science Networking RequirementsUS Dept. of Energy, Office of Science, Advanced Scientific

2006-01-01T23:59:59.000Z

320

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

requirement and guidance pages include: Sustainable Buildings and Campuses Facility Energy Intensity Reduction New Facility Construction and Major Renovation Pollution...

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

WATER REQUIREMENTS FOR A RADIOCHEMICAL PROCESSING PLANT  

SciTech Connect

A survey of the water requirements is presented for a hypothetical plant to process all the fuel from a 15,000Mwe nuclear economy. For each processing plant, specific requirements must be based on a detailed water survey which includes water quality, process requirements, and in-plant conservation plans. These considerations are discussed and the quantitative requirements are listed. (J.R.D.)

Harrington, F.E.

1962-05-28T23:59:59.000Z

322

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

323

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

324

SPECIAL ACQUISITION REQUIREMENTS ? TYPICAL ISSUES ASSOCIATED...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(iii) Approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria (iv) Awarding contracts (v) Administering...

325

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

326

Integrating Security RMF with Requirements Management – J ...  

Science Conference Proceedings (OSTI)

Integrating Security RMF with Requirements Management – J Peeler ... Security controls at “Low” Risk are risk accepted & may not need mitigation. ...

2013-12-13T23:59:59.000Z

327

Applications of Nuclear Resonance Fluorescence  

Science Conference Proceedings (OSTI)

Nuclear Resonance Fluorescence (NRF) has the potential of addressing a wide variety of applications, which require isotopic and/or elemental information about a sample. We have investigated a variety of non-proliferation applications that may be addressed by NRF. From these applications, we have selected two, measuring uranium enrichment in UF6 cylinders and material verification in dismantlement, to investigate in more detail. Analytical models have been developed to evaluate these applications, and test measurements have been conducted to validate those models. We found that it is unlikely with current technology to address the requirements for UF6 cylinder enrichment measurements. In contrast, NRF is a very promising approach for material verification for dismantlement.

Warren, Glen A.; Detwiler, Rebecca S.; Peplowski, Patrick N.

2010-11-11T23:59:59.000Z

328

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

329

Guidelines for Mapping Requirements to Technologies  

Science Conference Proceedings (OSTI)

This report describes in a concise format the IntelliGrid methodology for determining appropriate technologies to meet a given set of system requirements for advanced metering infrastructures (AMI). The process consists of three steps: 1) map technologies to functional areas of AMI, 2) map requirements to components and, therefore, functional areas of AMI, and 3) map individual requirements to technologies.

2008-06-17T23:59:59.000Z

330

Advanced Metering Infrastructure (AMI) System Security Requirements  

Science Conference Proceedings (OSTI)

This report identifies key cyber security requirements and suggests basic security approaches for safeguarding the many interfaces of Advanced Metering Infrastructure (AMI) systems. These requirements, which were developed through a clearly defined security assessment procedure, are generic; but they can be used to develop more specific security requirements based on actual configurations and environments.

2009-12-21T23:59:59.000Z

331

Natural Gas Applications  

Gasoline and Diesel Fuel Update (EIA)

Welcome to EIA's Natural Gas Applications. If you need assistance viewing this page, please call (202) 586-8800. Energy Information Administration Home Page Welcome to EIA's Natural Gas Applications. If you need assistance viewing this page, please call (202) 586-8800. Energy Information Administration Home Page Home > Natural Gas > Natural Gas Applications What's New Publications Applications Survey Forms Sign Up for Email Updates Contact Experts Applications EIA-176 Query System The EIA-176 Query system is a Windows-based system which runs under Windows operating systems 95, 98, 2000, NT - 4.0 Service Pack 3 or later. It provides a method of extracting and using the company level data filed on the Form EIA-176, and saving the query results in various media and formats. There are pre-selected data queries, which allow the user to select and run the most often-used queries, as well as the ability to create a customized query. Self-extracting executable files with run-time versions of Access are required to set up the system. You may also download the data tables if you already have Microsoft Access on your computer.

332

Plutonium Finishing Plant (PFP) Standards/Requirements Identification Document (S/RID)  

Science Conference Proceedings (OSTI)

This Standards/Requirements Identification Document (S/RID) sets forth the Environmental Safety and Health (ESH) standards/requirements for the Plutonium Finishing Plant (PFP). This S/RID is applicable to the appropriate life cycle phases of design, construction, operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

Maddox, B.S.

1996-01-01T23:59:59.000Z

333

SIENA Customer Problem Statement and Requirements  

Science Conference Proceedings (OSTI)

This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

2000-08-01T23:59:59.000Z

334

Software requirements definition Shipping Cask Analysis System (SCANS)  

SciTech Connect

The US Nuclear Regulatory Commission (NRC) staff reviews the technical adequacy of applications for certification of designs of shipping casks for spent nuclear fuel. In order to confirm an acceptable design, the NRC staff may perform independent calculations. The current NRC procedure for confirming cask design analyses is laborious and tedious. Most of the work is currently done by hand or through the use of a remote computer network. The time required to certify a cask can be long. The review process may vary somewhat with the engineer doing the reviewing. Similarly, the documentation on the results of the review can also vary with the reviewer. To increase the efficiency of this certification process, LLNL was requested to design and write an integrated set of user-oriented, interactive computer programs for a personal microcomputer. The system is known as the NRC Shipping Cask Analysis System (SCANS). The computer codes and the software system supporting these codes are being developed and maintained for the NRC by LLNL. The objective of this system is generally to lessen the time and effort needed to review an application. Additionally, an objective of the system is to assure standardized methods and documentation of the confirmatory analyses used in the review of these cask designs. A software system should be designed based on NRC-defined requirements contained in a requirements document. The requirements document is a statement of a project's wants and needs as the users and implementers jointly understand them. The requirements document states the desired end products (i.e. WHAT's) of the project, not HOW the project provides them. This document describes the wants and needs for the SCANS system. 1 fig., 3 tabs.

Johnson, G.L.; Serbin, R.

1985-07-21T23:59:59.000Z

335

IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE  

E-Print Network (OSTI)

This work studies an approach for gathering requirements, designing and developing an interactive collaborative multi-touch tabletop Geographic Information System (GIS) in an agile software development environment to support the operation of control centers in utility companies and potentially other similar domains. The research is based on two case studies. The first study focuses on agile approaches for gathering requirements and iteratively designing gesture-based, multi-touch GIS applications utilizing digital tables, where a prototype – eGrid – is developed for supporting the operation of the control centre in a local electricity company. The design is iteratively enhanced and assessed through interviews and observation sessions. The second study proposes an agile approach for generalizing the design and extracting a library of reusable components – GISforTT – to support the development of other interactive GIS applications. The two studies proposed agile software engineering practises that were found helpful in designing and supporting reuse of interactive tabletop applications. i “In the Name of Allah, the Most Merciful, the Most Compassionate” ii Acknowledgements

Elaf Sameh Selim

2012-01-01T23:59:59.000Z

336

Process Applications  

Science Conference Proceedings (OSTI)

...flash-welding applications include: Chain links Transmission bands Automotive flywheel ring gears Strips that are joined for continuous processing lines Wire and bar drawing operations for continuous stamping press

337

Superabrasive Applications  

Science Conference Proceedings (OSTI)

Table 2   Typical applications of superabrasives...airports, highways Mining products Stone, shale, rock Drilling Precision grinding wheels Carbide Tool production and resharpening; wear parts and

338

Industrial Applications  

Science Conference Proceedings (OSTI)

Table 2   Frequently used rubber linings in other industries...Application Lining Power industry Scrubber towers Blended chlorobutyl Limestone slurry tanks Blended chlorobutyl Slurry piping Blended chlorobutyl 60 Shore A hardness natural rubber Seawater cooling water

339

Accuracy of performance prediction for EJB applications: a statistical analysis  

Science Conference Proceedings (OSTI)

A challenging software engineering problem is the design and implementation of component-based (CB) applications that can meet specified performance requirements. Our PPCB approach has been developed to facilitate performance prediction of CB applications ...

Yan Liu; Ian Gorton

2004-09-01T23:59:59.000Z

340

The test data challenge for database-driven applications  

Science Conference Proceedings (OSTI)

Business applications rely typically on databases for storing and processing their data (database-driven applications, or DBAPs). Testing DBAPs requires testing the application logic plus the interaction between the application logic and the database. ... Keywords: databases, information systems, test coverage, test data, testing

Klaus Haller

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

West Coast Aerial Sardine Survey Application for Exempted Fishing Permit  

E-Print Network (OSTI)

West Coast Aerial Sardine Survey 2011 Application for Exempted Fishing Permit Applicant Scientific Field Leader: Ryan Howe May 9, 2011 1 #12;West Coast Aerial Sardine Survey Application Requirements ................... 51 2 #12;West Coast Aerial Sardine Survey Application for Exempted Fishing

342

Eligibility requirements for licensed professionals | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

provide. If you're found to have falsified information on a building's application for ENERGY STAR certification, EPA reserves the right to pursue recourse through state...

343

Energy Efficiency Requirements for State Government (Connecticut...  

Open Energy Info (EERE)

Incentive Type Energy Standards for Public Buildings Applicable Sector Local Government, State Government Eligible Technologies Comprehensive MeasuresWhole Building, Biomass,...

344

Advanced Modular Inverter Technology Development  

DOE Green Energy (OSTI)

Electric and hybrid-electric vehicle systems require an inverter to convert the direct current (DC) output of the energy generation/storage system (engine, fuel cells, or batteries) to the alternating current (AC) that vehicle propulsion motors use. Vehicle support systems, such as lights and air conditioning, also use the inverter AC output. Distributed energy systems require an inverter to provide the high quality AC output that energy system customers demand. Today's inverters are expensive due to the cost of the power electronics components, and system designers must also tailor the inverter for individual applications. Thus, the benefits of mass production are not available, resulting in high initial procurement costs as well as high inverter maintenance and repair costs. Electricore, Inc. (www.electricore.org) a public good 501 (c) (3) not-for-profit advanced technology development consortium assembled a highly qualified team consisting of AeroVironment Inc. (www.aerovironment.com) and Delphi Automotive Systems LLC (Delphi), (www.delphi.com), as equal tiered technical leads, to develop an advanced, modular construction, inverter packaging technology that will offer a 30% cost reduction over conventional designs adding to the development of energy conversion technologies for crosscutting applications in the building, industry, transportation, and utility sectors. The proposed inverter allows for a reduction of weight and size of power electronics in the above-mentioned sectors and is scalable over the range of 15 to 500kW. The main objective of this program was to optimize existing AeroVironment inverter technology to improve power density, reliability and producibility as well as develop new topology to reduce line filter size. The newly developed inverter design will be used in automotive and distribution generation applications. In the first part of this program the high-density power stages were redesigned, optimized and fabricated. One of the main tasks was to design and validate new gate drive circuits to provide the capability of high temp operation. The new power stages and controls were later validated through extensive performance, durability and environmental tests. To further validate the design, two power stages and controls were integrated into a grid-tied load bank test fixture, a real application for field-testing. This fixture was designed to test motor drives with PWM output up to 50kW. In the second part of this program the new control topology based on sub-phases control and interphase transformer technology was successfully developed and validated. The main advantage of this technology is to reduce magnetic mass, loss and current ripple. This report summarizes the results of the advanced modular inverter technology development and details: (1) Power stage development and fabrication (2) Power stage validation testing (3) Grid-tied test fixture fabrication and initial testing (4) Interphase transformer technology development

Adam Szczepanek

2006-02-04T23:59:59.000Z

345

Advanced Modular Inverter Technology Development  

SciTech Connect

Electric and hybrid-electric vehicle systems require an inverter to convert the direct current (DC) output of the energy generation/storage system (engine, fuel cells, or batteries) to the alternating current (AC) that vehicle propulsion motors use. Vehicle support systems, such as lights and air conditioning, also use the inverter AC output. Distributed energy systems require an inverter to provide the high quality AC output that energy system customers demand. Today's inverters are expensive due to the cost of the power electronics components, and system designers must also tailor the inverter for individual applications. Thus, the benefits of mass production are not available, resulting in high initial procurement costs as well as high inverter maintenance and repair costs. Electricore, Inc. (www.electricore.org) a public good 501 (c) (3) not-for-profit advanced technology development consortium assembled a highly qualified team consisting of AeroVironment Inc. (www.aerovironment.com) and Delphi Automotive Systems LLC (Delphi), (www.delphi.com), as equal tiered technical leads, to develop an advanced, modular construction, inverter packaging technology that will offer a 30% cost reduction over conventional designs adding to the development of energy conversion technologies for crosscutting applications in the building, industry, transportation, and utility sectors. The proposed inverter allows for a reduction of weight and size of power electronics in the above-mentioned sectors and is scalable over the range of 15 to 500kW. The main objective of this program was to optimize existing AeroVironment inverter technology to improve power density, reliability and producibility as well as develop new topology to reduce line filter size. The newly developed inverter design will be used in automotive and distribution generation applications. In the first part of this program the high-density power stages were redesigned, optimized and fabricated. One of the main tasks was to design and validate new gate drive circuits to provide the capability of high temp operation. The new power stages and controls were later validated through extensive performance, durability and environmental tests. To further validate the design, two power stages and controls were integrated into a grid-tied load bank test fixture, a real application for field-testing. This fixture was designed to test motor drives with PWM output up to 50kW. In the second part of this program the new control topology based on sub-phases control and interphase transformer technology was successfully developed and validated. The main advantage of this technology is to reduce magnetic mass, loss and current ripple. This report summarizes the results of the advanced modular inverter technology development and details: (1) Power stage development and fabrication (2) Power stage validation testing (3) Grid-tied test fixture fabrication and initial testing (4) Interphase transformer technology development

Adam Szczepanek

2006-02-04T23:59:59.000Z

346

NERSC HPC Program Requirements Review Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Published Reports Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 BER2017FinalJune7.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Biological and Environmental Research - Target 2017 NERSC-ASCR-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research NERSC-NP-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Nuclear Physics Research NERSC-FES-WorkshopReport.pdf | Adobe Acrobat PDF file

347

A Test Suite Generator For Struts Based Applications.  

E-Print Network (OSTI)

??Testing web-based enterprise applications requires the use of automated testing frameworks. The testing framework's ability to run suites of test cases through development ensures enhancements… (more)

Jackson, Gregory M.

2004-01-01T23:59:59.000Z

348

Bases for pump pit requirements calculations  

DOE Green Energy (OSTI)

A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.

Jacobs, R.A.

1992-02-13T23:59:59.000Z

349

NBP RFI: Communications Requirements- Honeywell Responses To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal...

350

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Follow this link to skip to the main content Facebook Flickr RSS Twitter YouTube Program Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile...

351

Partnership Requirements: ENERGY STAR Partnership for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Secondary menu About us Press room Contact Us Portfolio Manager...

352

Electric Vehicle Charging Levels and Requirements Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and certification Safety standards and certification * Charging definitions * EVSE ( (electric vehicle supp pp y ly eq quip pment) ) examp ples * Installation requirements * Siting...

353

Exterior Lighting Requirements and COMcheck | Building Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Version Development Adoption Compliance Regulations Resource Center Exterior Lighting Requirements and COMcheck This course includes a discussion of the exterior lighting...

354

This content requires Flash - Business Cards  

This content requires Flash. To view this content, JavaScript must be enabled, and you need the latest version of the Adobe Flash Player. Download the ...

355

Allocating Variability and Reserve Requirements (Presentation)  

SciTech Connect

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

356

NERSC/DOE HPC Requirements Workshops Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview NERSC HPC Program Requirements Reviews Overview Scope These workshops are focused on determining the computational challenges facing research teams and the computational...

357

NERSC/DOE BER Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

for Biological and Environmental Research: Target 2017 A Joint ASCR BER NERSC Requirements Review September 11-12, 2012 DOE NERSC Participants and Organizers Name...

358

NERSC/DOE FES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Fusion Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for fusion energy sciences...

359

NERSC/DOE ASCR Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Logistics Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research January 5-6, 2011 Location The workshop will be held at NERSC's...

360

NERSC/DOE BES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Basic Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for high energy physics...

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NERSC/DOE ASCR Requirements Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Agenda Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research ASCR NERSC Workshop January 5-6, 2011 >> Download and View these...

362

NERSC/DOE ASCR Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 Sort by: Default | Name |...

363

NERSC/DOE ASCR Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

Participants Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 On-Site Participants Name...

364

Cape Charles - STIP Minimum Sustainability Requirements (Virginia...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Cape Charles - STIP Minimum Sustainability Requirements (Virginia) This is the approved revision of this page, as well as...

365

Allocating Variability and Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

366

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Law and Regulation Federal agencies must meet energy management requirements outlined by Federal various statutory laws and regulations. They include: National Energy Conservation...

367

NERSC/DOE BER Requirements Meeting Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Math & Computer Science Nuclear Science Science Highlights HPC Requirements Reviews Basic Energy Sciences Fusion Energy Sciences (FES) High Energy Physics (HEP) Biological and...

368

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows 7, Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not...

369

LBNL Windows & Daylighting Software -- THERM: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not supported. (The...

370

LBNL Windows & Daylighting Software -- WINDOW: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Vista, Microsoft Windows 7, Microsoft Windows XP, Windows 2000TM.. It has been reported by users that the...

371

Event-based applications and enabling technologies  

Science Conference Proceedings (OSTI)

Event processing has become the paradigm of choice in many monitoring and reactive applications. However, the understanding of events, their composition and level of abstraction, the style of processing and the quality of service requirements vary drastically ...

Annika Hinze; Kai Sachs; Alejandro Buchmann

2009-07-01T23:59:59.000Z

372

Stockpile Transition Enabling Program (STEP): Process and project requirements  

Science Conference Proceedings (OSTI)

The Stockpile Transition Enabling Program (STEP) is aimed at identifying weapon components suitable for use in more than one weapon and for qualifying components so identified for multiple use. Work includes identifying the means to maintain the manufacturing capability for these items. This document provides the participants in STEP a common, consistent understanding of the process and requirements. The STEP objectives are presented and the activities are outlined. The STEP project selections are based on the customer needs, product applicability, and maturity of the technology used. A formal project selection process is described and the selection criteria are defined. The concept of {open_quotes}production readiness{close_quotes} is introduced, along with a summary of the project requirements and deliverables to demonstrate production readiness.

Ma, Kwok Kee

1993-06-01T23:59:59.000Z

373

Horizontal flow drilling requires focus on well control  

Science Conference Proceedings (OSTI)

Horizontal wells drilled underbalanced or while flowing must have surface equipment and a blow-out preventer stack specially designed for circulating operations. Functional well control methods for drilling horizontal wells have been developed in specific regions worldwide. Special safety equipment and procedures, however, are still required in most horizontal development applications. The challenge for horizontal drilling development and underbalanced drilling is to overcome the obstacles of government regulation, reduce pollution dangers, and improve personnel and equipment safety. Well control techniques tailored to the demands of each field can help overcome these challenges. Several well control elements must be addressed carefully on each horizontal well: drilling fluid requirements, well control procedures and equipment, and surface equipment and special considerations for handling hydrocarbons produced while drilling. The paper discusses each of these elements for underbalanced horizontal drilling.

Tangedahl, M.J. (RBOP Oil Tools International Inc., Houston, TX (United States))

1994-06-13T23:59:59.000Z

374

NERSC Applications Software  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users Software Applications Applications List of Applications List of math, chemistry and materials science software installed at NERSC. Mathematical Applications...

375

Building HVAC Requirements Overview Page 4-1 4 Building HVAC Requirements  

E-Print Network (OSTI)

Building HVAC Requirements ­ Overview Page 4-1 4 Building HVAC Requirements 4.1 Overview 4 conditioning (HVAC) systems. The requirements are presented in this chapter so that it may serve as a single. 2008 Residential Compliance Manual August 2009 #12;Page 4-2 Building HVAC Requirements ­ Overview 4

376

Core Science Requirement Final Document Page 1 THE CORE SCIENCE REQUIREMENT and  

E-Print Network (OSTI)

Core Science Requirement ­ Final Document ­ Page 1 THE CORE SCIENCE REQUIREMENT and MENDEL SCIENCE EXPERIENCE COURSES Core requirement of 2 semesters of science with laboratory; requirement to be met by the end of the sophomore year Rationale Science literacy is an integral part of the intellectual

Lagalante, Anthony F.

377

Identification of water requirements for selected enhanced oil recovery methods  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are thoroughly evaluated by using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in fourteen major oil companies. The different uses of water in selected EOR methods, as well as current research trends, are discussed. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and carbon dioxide, micellar-polymer, polymer, and caustic flooding) in those states and specific geographical locations where these processes will likely play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources (e.g., aquifers, lakes, produced water). A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle (e.g., some is lost in oil and water separation and water treatment processes) in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can significantly reduce the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality (e.g., low total dissolved solids) surface water and ground water could be impediments to certain projects in the near future. 4 figures, 14 tables.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1982-09-01T23:59:59.000Z

378

Applicant Organization: | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applicant Organization: Applicant Organization: Applicant Organization: More Documents & Publications BlueFire Ethanol, Inc. Applicant Organization: Applicant Organization:...

379

Splits stream handlers: deploying application-level services to attached network processors  

Science Conference Proceedings (OSTI)

Modern distributed applications utilize a rich variety of distributed services. Due to the computation-centric notions of modern machines, application-level implementations of these services are problematic for applications requiring high data transfer ...

Ada Gavrilovska / Karsten Schwan

2004-01-01T23:59:59.000Z

380

Physics Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications Applications Technetium-99m radioisotope generator developed at Brookhaven. Numerous physics-related programs at Brookhaven have yielded major advances in medicine and various technologies. Brookhaven's nuclear medicine program, which began in the 1950s, uses the Brookhaven Linac Isotope Producer to make radioisotopes for nuclear medicine diagnostics and treatment throughout the world. Today, more than 85 percent of all imaging examinations worldwide use one of the radioisotopes developed at Brookhaven. At Brookhaven's Center for Translational Neuroimaging, researchers can peer into a living brain through the use of various imaging modalities, including positron emission tomography (PET), magnetic resonance imaging (MRI), and optical imaging. Such research has led to a new understanding of

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Compliance Certification Application  

NLE Websites -- All DOE Office Websites (Extended Search)

40 CFR Part 191 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant Appendix PIC United States Department of Energy Waste Isolation Pilot Plant Carlsbad Area Office Carlsbad, New Mexico Passive Institutional Controls Conceptual Design Report PASSIVE INSTITUTIONAL CONTROLS CONCEPTUAL DESIGN REPORT REVISION 0 MAY 14, 1996 1 C PASSIVE INSTITUTIONAL CONTROLS DESIGN REPORT REVISION 0 PASSIVE INSTITUTIONAL CONTROLS CONCEPTUAL DESIGN REPORT MAY 1 4 . 1 9 9 6 TABLE OF CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . 1 A . Purpose . . . . . . . . . . . . . . . . . . . 1 B . Scope . . . . . . . . . . . . . . . . . . . . . 3 C . Background . . . . . . . . . . . . . . . . . . . 7 I1 . SITE DESCRIPTION . . . . . . . . . . . . . . . . . 11 I11 . DESIGN REQUIREMENTS/CRITERIA . . . . . . . . . . 17 IV . MESSAGES . . . . . . . . . . . . . . . . . .

382

Supporting requirements engineers in recognising security issues  

Science Conference Proceedings (OSTI)

Context & motivation: More and more software projects today are security-related in one way or the other. Many environments are initially not considered security-related and no security experts are assigned. Requirements engineers often fail to recognise ... Keywords: empirical study, natural language processing, requirements analysis, secure software engineering

Eric Knauss; Siv Houmb; Kurt Schneider; Shareeful Islam; Jan Jürjens

2011-03-01T23:59:59.000Z

383

Clean Air Act Requirements: Uranium Mill Tailings  

E-Print Network (OSTI)

EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick Presentation to Environmental Protection Agency Uranium Contamination Radiation Protection Division (6608J requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach

384

Lightweight Formalisation in Support of Requirements Engineering  

Science Conference Proceedings (OSTI)

Formal design supported by automated reasoning can help keep track of requirements—a particular problem for large, detailed systems. Designers of system specifications are often constrained by codes of practice and must show not only that ... Keywords: automated reasoning, design, requirements, safety-critical systems, software engineering, specifications

Jane Hesketh; David Robertson; Norbert Fuchs; Alan Bundy

1998-04-01T23:59:59.000Z

385

CALIFORNIA INSTITUTE OF TECHNOLOGY Application Instructions  

E-Print Network (OSTI)

CALIFORNIA INSTITUTE OF TECHNOLOGY Application Instructions REQUIREMENTS AND ADMISSION CRITERIA of the Dean of Graduate Studies, California Institute of Technology, Mail Code 23087, 1200 E. California Blvd the property of the California Institute of Technology. No materials will be returned to the applicant

Greer, Julia R.

386

January 20, 2012 GRANT SOLICITATION APPLICATION PACKAGE  

E-Print Network (OSTI)

to a minimum of 20 percent of the total project costs is required either in cash or from in-kind services from to count as match those project costs incurred after the Energy Commission notifies the applicant that its non-state sources (for example, a $125,000 project would require a match of $25,000 from non

387

Statutory Requirements | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Printable Version Development Adoption Compliance Regulations Resource Center Statutory Requirements DOE activities surrounding building energy codes are defined by the following statutory requirements. Specific language outlining federal requirements and associated regulations are outlined below. References are also provided to individual statutes. State Building Energy Efficiency Codes Statutory Authority: Energy Conservation and Production Act (ECPA) (Pub. L. No. 94-385), as amended1 Section 304(a) of ECPA, as amended, provides that when the 1992 Model Energy Code (MEC), or any successor to that code2, is revised, the Secretary must determine, not later than 12 months after the revision, whether the revised code would improve energy efficiency in residential

388

Microsoft Word - Topic A Requirements _2_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Requirements A Requirements Topic A, Interconnection-Level Analysis and Planning Topic A awardees must fulfill the following requirements: 1. The work to be performed must cover the entire Interconnection. 2. Analyses and planning must be developed and performed in a transparent and collaborative manner, and the study processes must be open to participation by state and federal officials, representatives from independent system operators (ISOs) and regional transmission organizations (RTOs), utilities, and relevant stakeholder bodies or non-government organizations (NGO's), including appropriate entities in Canada and Mexico. Discuss approach to ensure consensus among stakeholders on key issues. 3. The awardee must establish a multi-constituency steering group that will provide

389

Green Building Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Requirement Green Building Requirement Green Building Requirement < Back Eligibility Commercial Schools State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Heating Wind Program Info State District of Columbia Program Type Energy Standards for Public Buildings Provider District Department of the Environment The District of Columbia City Council enacted [http://dcclims1.dccouncil.us/images/00001/20061218152322.pdf B16-515] on December 5, 2006, establishing green building standards for public buildings and privately-owned commercial buildings of 50,000 square feet or

390

Data requirements and acquisition for reservoir characterization  

Science Conference Proceedings (OSTI)

This report outlines the types of data, data sources and measurement tools required for effective reservoir characterization, the data required for specific enhanced oil recovery (EOR) processes, and a discussion on the determination of the optimum data density for reservoir characterization and reservoir modeling. The two basic sources of data for reservoir characterization are data from the specific reservoir and data from analog reservoirs, outcrops, and modern environments. Reservoir data can be divided into three broad categories: (1) rock properties (the container) and (2) fluid properties (the contents) and (3)interaction between reservoir rock and fluid. Both static and dynamic measurements are required.

Jackson, S.; Chang, Ming Ming; Tham, Min

1993-03-01T23:59:59.000Z

391

Supporting use case based requirements engineering  

E-Print Network (OSTI)

Use Cases that describe possible interactions involving a system and its environment are increasingly being accepted as effective means for functional requirements elicitation and analysis. In the current practice, informal definitions of use cases are used and the analysis process is manual. In this paper, we present an approach supported by a tool for use cases based requirements engineering. Our approach includes use cases formalization, a restricted form of natural language for use cases description, and the derivation of an executable specification as well as a simulation environment from use cases. Key words: Use cases, domain modeling, UML, requirements engineering, prototyping

Stéphane S. Somé

2006-01-01T23:59:59.000Z

392

Part B - Requirements & Funding Information PART B - Requirements and Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b. Part B 1 b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable activity that requires an interagency agreement. This Part of the interagency agreement (IA) (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting

393

land requirements | OpenEI Community  

Open Energy Info (EERE)

by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm...

394

Siting Requirements for Anaerobic Lagoons (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

395

Tucson- Solar Design Requirement for Homes  

Energy.gov (U.S. Department of Energy (DOE))

Tucson adopted an ordinance in June 2008 that requires all new single-family homes and duplexes in Tucson to be "solar-ready." The ordinance was developed by a stakeholder group which included...

396

Federal Greenhouse Gas Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements Requirements Federal Greenhouse Gas Requirements October 7, 2013 - 10:02am Addthis Executive Order (E.O.) 13514 expands the energy reduction and environmental requirements of Executive Order 13423 by making greenhouse gas (GHG) management a priority for the Federal government. Under Section 2 of E.O. 13514, each Federal agency must: Within 90 days of the order, establish and report to the CEQ Chair and OMB Director a percentage reduction target for agency-wide reductions of Scope 1 and Scope 2 GHG emissions in absolute terms by fiscal year 2020 relative to a fiscal year 2008 baseline of the agency's Scope 1 greenhouse gas emissions. In establishing the target, agencies shall consider reductions associated with: Reducing agency building energy intensity Increasing agency renewable energy use and implementing on-site renewable

397

Technical requirements specification for tank waste retrieval  

Science Conference Proceedings (OSTI)

This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

Lamberd, D.L.

1996-09-26T23:59:59.000Z

398

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

for many commuters’ electric cars. California requires that,well suited to charging electric cars. If the solar energydrivers who don’t own electric cars can feel green when they

Shoup, Donald

2012-01-01T23:59:59.000Z

399

Cook County- LEED Requirements for County Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In 2002, Cook County enacted an ordinance requiring all new county buildings and all retrofitted county buildings to be built to LEED standards. Specifically, all newly constructed buildings and...

400

Deepwater Offshore Wind Technology Research Requirements (Poster)  

DOE Green Energy (OSTI)

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Deriving Quantified Safety Requirements in Complex Systems  

Science Conference Proceedings (OSTI)

A variety of hazard analysis techniques have been proposed for software-based systems but individually the techniques are limited in their ability to cope with system complexity, or to derive and prioritise component safety requirements. There is also ...

Peter A. Lindsay; John A. McDermid; David J. Tombs

2000-10-01T23:59:59.000Z

402

Deepwater Offshore Wind Technology Research Requirements (Poster)  

SciTech Connect

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

403

Temporal Sampling Requirements for Automatic Rain Gauges  

Science Conference Proceedings (OSTI)

Automatic rain gauges are needed to obtain rainfall statistics from remote locations and platforms. Many of these platforms cannot be serviced regularly, thus requiring unattended operations for many months. At such locations there is often a ...

Jeffrey A. Nystuen

1998-12-01T23:59:59.000Z

404

NERSC/DOE FES Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Fusion Energy Sciences An FES ASCR NERSC Workshop August 3-4, 2010 Sort by: Default | Name | Date (low-high) | Date (high-low) FESNERSC Requirements Gathering Workshop August...

405

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Windows 95, Windows 98, Windows 2000, Windows XP, or Windows NT CPU TYPE Pentium (a 133 MHz pentium will take about 40 seconds to perform a...

406

Diagnostic Requirements for the Superrotation on Venus  

Science Conference Proceedings (OSTI)

For the solar heating and zonal wind profiles observed in the Venus atmosphere (below 80 km) we have calculated the eddy source pattern required to maintain the zonally averaged circulation.

Arthur Y. Hou; Richard M. Goody

1985-03-01T23:59:59.000Z

407

Energy Efficiency and Conservation Requirements for Utilities...  

Open Energy Info (EERE)

standard. Phase II will run from June 1, 2013 - May 31, 2016 and requires (tentatively) energy savings that vary by utility from 1.6% to 2.9% of June 2009 - May 2010 electricity...

408

Cold vacuum drying facility design requirements  

SciTech Connect

This release of the Design Requirements Document is a complete restructuring and rewrite to the document previously prepared and released for project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility.

Irwin, J.J.

1997-09-24T23:59:59.000Z

409

Smart Grid Information Security (IS) Functional Requirement  

E-Print Network (OSTI)

It is important to implement safe smart grid environment to enhance people's lives and livelihoods. This paper provides information on smart grid IS functional requirement by illustrating some discussion points to the sixteen identified requirements. This paper introduces the smart grid potential hazards that can be referred as a triggering factor to improve the system and security of the entire grid. The background of smart information infrastructure and the needs for smart grid IS is described with the adoption of hermeneutic circle as methodology. Grid information technology and security-s session discusses that grid provides the chance of a simple and transparent access to different information sources. In addition, the transformation between traditional versus smart grid networking trend and the IS importance on the communication field reflects the criticality of grid IS functional requirement identification is introduces. The smart grid IS functional requirements described in this paper are general and ...

Ling, Amy Poh Ai

2011-01-01T23:59:59.000Z

410

Application Acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

Acceleration Acceleration on Current and Future Cray Platforms Alice Koniges, Robert Preissl, Jihan Kim, Lawrence Berkeley National Laboratory David Eder, Aaron Fisher, Nathan Masters, Velimir Mlaker, Lawrence Livermore National Laboratory Stephane Ethier, Weixing Wang, Princeton Plasma Physics Laboratory Martin Head-Gordon, University of California, Berkeley and Nathan Wichmann, Cray Inc. ABSTRACT: Application codes in a variety of areas are being updated for performance on the latest architectures. We describe current bottlenecks and performance improvement areas for applications including plasma physics, chemistry related to carbon capture and sequestration, and material science. We include a variety of methods including advanced hybrid parallelization using multi-threaded MPI, GPU acceleration, libraries and auto- parallelization compilers. KEYWORDS: hybrid

411

Requirements and Submission Process for Qualified Software  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements and Submission Process for Qualified Software The U.S. Department of Energy (DOE) verifies and maintains the list of software that qualifies for the calculation of the energy and power cost savings for commercial building tax deductions under tax code Section 179D. The software requirements are listed under Internal Revenue Service (IRS) Code §179D (c)(1) and (d) Regulations, Notice 2006-52

412

Requirements model generation to support requirements elicitation: the Secure Tropos experience  

Science Conference Proceedings (OSTI)

In recent years several efforts have been devoted by researchers in the Requirements Engineering community to the development of methodologies for supporting designers during requirements elicitation, modeling, and analysis. However, these methodologies ... Keywords: Lightweight text analysis, Model generation

Nadzeya Kiyavitskaya; Nicola Zannone

2008-06-01T23:59:59.000Z

413

Balance of Plant Requirements for a Nuclear Hydrogen Plant  

DOE Green Energy (OSTI)

This document describes the requirements for the components and systems that support the hydrogen production portion of a 600 megawatt thermal (MWt) Next Generation Nuclear Plant (NGNP). These systems, defined as the "balance-of-plant" (BOP), are essential to operate an effective hydrogen production plant. Examples of BOP items are: heat recovery and heat rejection equipment, process material transport systems (pumps, valves, piping, etc.), control systems, safety systems, waste collection and disposal systems, maintenance and repair equipment, heating, ventilation, and air conditioning (HVAC), electrical supply and distribution, and others. The requirements in this document are applicable to the two hydrogen production processes currently under consideration in the DOE Nuclear Hydrogen Initiative. These processes are the sulfur iodide (S-I) process and the high temperature electrolysis (HTE) process. At present, the other two hydrogen production process - the hybrid sulfur-iodide electrolytic process (SE) and the calcium-bromide process (Ca-Br) -are under flow sheet development and not included in this report. While some features of the balance-of-plant requirements are common to all hydrogen production processes, some details will apply only to the specific needs of individual processes.

Bradley Ward

2006-04-01T23:59:59.000Z

414

INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 This guidance is intended to clarify the Department of Energy (DOE)'s interpretation of 10 C.F.R. § 205.322, which sets forth the contents of an application for a Presidential permit issued by DOE under Executive Order (E.O.) 10485, as amended by E.O. 12038. Anyone seeking to construct, operate, maintain, or connect an electric transmission facility crossing the borders of the United States must first obtain a Presidential permit. INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Conservation Law Foundation, Appalachian Mountain Club, and

415

Department of Energy to Invest up to $12 Million to Support Early...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratories, the Department is also making significant investments in training solar systems installers, supporting the growth of grid-tied solar photovoltaic systems,...

416

North Carolina | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy in North Carolina, offers production payments for grid-tied electricity generated by solar, wind, small hydro (10 megawatts or less) and biomass resources. Payment...

417

City of San Marcos - Distributed Generation Rebate Program (Texas...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a Distributed Generation Rebate Program for the installation of grid-tied renewable energy systems. The Distributed Generation Rebate Program is offered on a first-come...

418

Browse wiki | Open Energy Information  

Open Energy Info (EERE)

+ , Solar + , Solar cell + , passive-solar architectural glass + , solar grid-tie inverter + , semiconductor + , flat panel display + , data storage + , Rockies Area + , Fort...

419

Development and Demonstration of a New-Generation High Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

unit resulting in: Grid tie enabled using commercial solar photovoltaic - inverter Integrated feed gas compressor, water system and - gas quality monitoring Onboard...

420

A comparison of the conductor requirements for energy storage devices made with ideal coil geometries  

DOE Green Energy (OSTI)

Superconducting Magnetic Energy Storage (SMES) plants have been proposed in both solenoidal and toroidal geometries. The former is efficient in terms of the quantity of superconductor required per unit of stored energy. For applications where a fringe field could be a problem, the toroidal geometry, which requires at least a factor of two more material, has been proposed. In addition to the solenoid and toroid, other geometries are possible, such as linear multipoles and spherical coils. These geometries have been considered for use in applications other than energy storage. In this report, the effectiveness (quantity of superconductor/stored energy) is calculated for various coil geometries. 7 refs., 4 tabs.

Hassenzahl, W.

1988-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Communication services for advanced network applications.  

SciTech Connect

Advanced network applications such as remote instrument control, collaborative environments, and remote I/O are distinguished by traditional applications such as videoconferencing by their need to create multiple, heterogeneous flows with different characteristics. For example, a single application may require remote I/O for raw datasets, shared controls for a collaborative analysis system, streaming video for image rendering data, and audio for collaboration. Furthermore, each flow can have different requirements in terms of reliability, network quality of service, security, etc. They argue that new approaches to communication services, protocols, and network architecture are required both to provide high-level abstractions for common flow types and to support user-level management of flow creation and quality. They describe experiences with the development of such applications and communication services.

Bresnahan, J.; Foster, I.; Insley, J.; Toonen, B.; Tuecke, S.

1999-06-10T23:59:59.000Z

422

Applications for Exceptions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applications for Exceptions Applications for Exceptions Applications for Exceptions EIA Form Filings A few new cases involving requests to be excused from reporting requirements imposed by the Department's Energy Information Administration are now available. If you are looking for general information about EIA reporting requirements, check out the questions and answers that are available by clicking on the appropriate button above. Access is available to DOE's regulations governing the processing of requests for exceptions from the requirement that you submit information to the Energy Information Administration (EIA). In addition, answers are also available in question and answer format to some questions commonly asked by firms that are required to file forms with the Energy Information

423

Abstract--Compared to the conventional grid, the smart grid requires active participation of consumers to improve the quality  

E-Print Network (OSTI)

courses. His research interests include distribution automation, smart grid applications, electric1 Abstract-- Compared to the conventional grid, the smart grid requires active participation been visionary documents on smart grids that call for improved security [6], [7]. There are researchers

Namboodiri, Vinod

424

Client Side Requirements for Data Acquisition and Control Subsystems for Distribution Automation  

Science Conference Proceedings (OSTI)

International standards such as those emerging from the International Electrotechnical Commission (IEC) have more capability to not only execute power engineering applications but to assist in the management and security of the next generation of automation equipment. Development of products and equipment that build on open standards such as IEC 61850 requires these steps to define the initial requirements for equipment that can take advantage of the advanced capabilities of these standards. Development ...

2004-12-21T23:59:59.000Z

425

Open-cycle MHD power conditioning and control requirements definition. Final report  

SciTech Connect

In this report a generic inverter configuration is defined, and the relevant characteristics of line- and forced-commutated inverters are compared and evaluated for their suitability for MHD power applications. The interface requirements of an MHD channel inverter-utility interactive system are defined, and a forced-commutated inverter meeting these requirements is described. The results of a set of tests using this inverter are described along with recommendations for future work in this field.

Petty, S.; Williams, K.

1980-03-01T23:59:59.000Z

426

Sequence-Length Requirements for Phylogenetic Methods  

E-Print Network (OSTI)

We study the sequence lengths required by neighbor-joining, greedy parsimony, and a phylogenetic reconstruction method (DCM NJ +MP) based on disk-covering and the maximum parsimony criterion. We use extensive simulations based on random birth-death trees, with controlled deviations from ultrametricity, to collect data on the scaling of sequence-length requirements for each of the three methods as a function of the number of taxa, the rate of evolution on the tree, and the deviation from ultrametricity. Our experiments show that DCM NJ +MP has consistently lower sequence-length requirements than the other two methods when trees of high topological accuracy are desired, although all methods require much longer sequences as the deviation from ultrametricity or the height of the tree grows. Our study has significant implications for large-scale phylogenetic reconstruction (where sequence-length requirements are a crucial factor), but also for future performance analyses in phylogenetics (since deviations from ultrametricity are proving pivotal).

Bernard M. E. Moret; Usman Roshan; Tandy Warnow; Y Warnow

2002-01-01T23:59:59.000Z

427

MRS Preliminary Site Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MRS Preliminary Site Requirements MRS Preliminary Site Requirements MRS Preliminary Site Requirements In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be

428

World nuclear fuel cycle requirements 1991  

Science Conference Proceedings (OSTI)

The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

Not Available

1991-10-10T23:59:59.000Z

429

Tracking Quintessence Would Require Two Cosmic Coincidences  

E-Print Network (OSTI)

Good tracking requires that the quintessence energy fraction slowly increase while the roll $\\lambda\\equiv -d\\ln V/\\varkappa d\\phi$ slowly decreases, but is not yet truly slow-rolling. The supernova bound on the present quintessence equation of state requires either (1) a cosmological constant or other fine-tuned "crawling quintessence" or (2) "roll-over quintessence" that tracked until recently, but now became slow rolling, because of a sharp increase in potential curvature. Thus, fine-tuning is required by constant equation of state and inverse power potentials, but can be avoided by the SUGRA and Skordis-Albrecht potentials and other good trackers, provided quintessence energy domination and slow roll {\\em both} began only recently. This makes the time in which we live special in {\\em two} respects.

Sidney Bludman

2004-03-22T23:59:59.000Z

430

NBP RFI: Communications Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements NBP RFI: Communications Requirements Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission substations connected via 1,300 miles of transmission lines, together feeding over 350 distribution substations,

431

Requirements for Wind Development | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Wind Development Requirements for Wind Development Requirements for Wind Development < Back Eligibility Commercial Construction Industrial Installer/Contractor Utility Savings Category Wind Buying & Making Electricity Program Info State Oklahoma Program Type Solar/Wind Permitting Standards In 2010, Oklahoma passed HB 2973, known as The Oklahoma Wind Energy Development Act. The bill becomes effective January 1, 2011. The Act provides sets rules for owners of wind energy facilities related to decommissioning, payments, and insurance. * Within one year of abandonment of a project, equipment from wind energy facilities must be removed and the land must be returned to its condition prior to the facility construction, except for roads. * After 15 years of operation, wind energy facility owners must file an

432

MRS Preliminary Site Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MRS Preliminary Site Requirements MRS Preliminary Site Requirements MRS Preliminary Site Requirements In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be

433

Stack Height Requirements (Ohio) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) < Back Eligibility Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Ohio Program Type Environmental Regulations Provider Ohio Environmental Protection Agency This chapter of the law establishes that the Ohio Environmental Protection Agency provides regulations for stacks for industrial facilities. "Stack" means any chimney, flue, conduit or duct arranged to conduct any emissions to the ambient air, excluding flares. "Stack height" means the distance from the ground-level elevation at the base of the stack to the crown of the stack. If a stack arises from a building or other structure, the ground-level elevation of that building or structure will be

434

Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill  

DOE Green Energy (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Johnson County Landfill in Shawnee, Kansas, for a feasibility study of renewable energy production. Citizens of Shawnee, city planners, and site managers are interested in redevelopment uses for landfills in Kansas that are particularly well suited for grid-tied solar photovoltaic (PV) installation. This report assesses the Johnson County Landfill for possible grid-tied PV installations and estimates the cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). Each option represents a standalone system that can be sized to use an entire available site area. In addition, the report outlines financing options that could assist in the implementation of a system. The feasibility of PV systems installed on landfills is highly impacted by the available area for an array, solar resource, operating status, landfill cap status, distance to transmission lines, and distance to major roads. The report findings are applicable to other landfills in the surrounding area.

Salasovich, J.; Mosey, G.

2012-01-01T23:59:59.000Z

435

Microsoft Word - S07566_Requirements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2012 LMS/FUSRAP/S07566 Rev. 1 This page intentionally left blank LMS/FUSRAP/S07566 Rev. 1 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2012 This page intentionally left blank U.S. Department of Energy LTS&M Requirements for Remediated FUSRAP Sites March 2012 Doc. No. S07566, Rev. 1 Page i Contents Executive Summary ....................................................................................................................... iii 1.0 Acid/Pueblo Canyon, New Mexico, Site ...............................................................................1

436

Nuclear Power and the World's Energy Requirements  

E-Print Network (OSTI)

The global requirements for energy are increasing rapidly as the global population increases and the under-developed nations become more advanced. The traditional fuels used in their traditional ways will become increasingly unable to meet the demand. The need for a review of the energy sources available is paramount, although the subsequent need to develop a realistic strategy to deal with all local and global energy requirements is almost as important. Here attention will be restricted to examining some of the claims and problems of using nuclear power to attempt to solve this major question.

V. Castellano; R. F. Evans; J. Dunning-Davies

2004-06-10T23:59:59.000Z

437

Ootw Tool Requirements in Relation to JWARS  

Science Conference Proceedings (OSTI)

This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

Hartley III, D.S.; Packard, S.L.

1998-01-01T23:59:59.000Z

438

Passive incentive requirements: a regional assessment  

DOE Green Energy (OSTI)

The nation's goal of 20% solar contribution by the turn of the century will be achieved, in part, by the construction of residences heated by virtue of their passive solar designs. These designs are not economically competitive against all conventional fuels in all locations. Some degree of government incentive will be required to assure a competitive position for these designs. A methodology is presented which is used to assess the magnitude of the government incentive required to assure feasibility. The methodology is used to provide a regional assessment for the Pacific Northwest under alternative home ownership periods and conventional fuel types.

Ben-David, S.; Kirschner, C.; Noll, S.A.; Roach, F.

1980-01-01T23:59:59.000Z

439

DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY...

440

DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS. Key Cyber...

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Large Scale Computing and Storage Requirements for Fusion Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Fusion Energy Sciences (FES) Large Scale Computing and Storage Requirements for Fusion Energy...

442

Audit of Staffing Requirements for the Strategic Petroleum Reserve...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staffing Requirements for the Strategic Petroleum Reserve, IG-0370 Audit of Staffing Requirements for the Strategic Petroleum Reserve, IG-0370 Audit of Staffing Requirements for...

443

Education, Job Requirements, and Commuting: An Analysis of Network Flows  

E-Print Network (OSTI)

Education, Job Requirements,and Commuting: Analysis of Ne~f,,/ Education, Job Requirements, and Commuting: Analysis ofin Education, Job Requirements, and Commuting: Analysis of

Harsman, Bjorn; Quigley, John M.

1998-01-01T23:59:59.000Z

444

Large Scale Computing and Storage Requirements for Basic Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Basic Energy Sciences (BES) Large Scale Computing and Storage Requirements for Basic Energy...

445

Valve Application, Maintenance, and Repair Guide  

Science Conference Proceedings (OSTI)

The Valve Application, Maintenance, and Repair Guide is a two-volume series that provides a generic overview of valve application, selection, maintenance, and repair. Volume 1 of the series is a comprehensive reference on the application and use of valves that provides guidance on the selection of specific types of valves on the basis of functional and system requirements. This document is based on an earlier EPRI document (NP-6516, Guide for the Application and Use of Valves in Power Plant Systems). Ext...

1999-05-07T23:59:59.000Z

446

Model Checking Complete Requirements Specifications Using Abstraction  

Science Conference Proceedings (OSTI)

Although model checking has proven remarkably effective in detecting errors in hardware designs, its success in the analysis of software specifications has been limited. Model checking algorithms for hardware verification commonly use Binary Decision ... Keywords: SCR, abstraction, model checking, requirements specification, verification

Ramesh Bharadwaj; Constance L. Heitmeyer

1999-01-01T23:59:59.000Z

447

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

448

THE REQUIREMENTS OF A FUSION DEMONSTRATION  

E-Print Network (OSTI)

, that are predicted by theory but are not yet well established experimentally. The two reactors will have the same of the commercial nuclear power business or construction of a new production reactor based on HTGR technology#12;THE REQUIREMENTS OF A FUSION DEMONSTRATION REACTOR AND THE STARLITE STUDY Robert W. Conn

Najmabadi, Farrokh

449

A requirements catalog for mobile learning environments  

Science Conference Proceedings (OSTI)

Mobile learning (m-learning) can be characterized by the ability to promote a strong interaction among apprentices and tutors, assuring greater motivation, convenience and flexibility to the learning process. Mobile learning environments have emerged ... Keywords: mobile learning, prioritization, requirements, systematic review

Nemésio Freitas Duarte Filho; Ellen Francine Barbosa

2013-03-01T23:59:59.000Z

450

CELL, MOLECULAR AND DEVELOPMENTAL BIOLOGY Graduation Requirements  

E-Print Network (OSTI)

CELL, MOLECULAR AND DEVELOPMENTAL BIOLOGY Graduation Requirements: A minimum 2.0 average in all in Biology III: Cell Structure and Function (2 cr.; fall) 6. BIOL 24100 Biology IV: Genetics and Molecular Biology (3 cr.; spring) 7. BIOL 24200 Laboratory in Genetics and Molecular Biology (2 cr.; spring) 8. BIOL

Jiang, Wen

451

End User Functional and Performance Requirements for HTGR Energy Supply to Industrial Processes  

SciTech Connect

This document specifies end user functional and performance requirements to be used in the development of the design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to industrial processes. These requirements were developed from collaboration with industry and HTGR suppliers and from detailed evaluation of integration of the HTGR technology in industrial processes. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a plant design that will serve the broadest range of industrial applications.

L.E. Demick

2010-09-01T23:59:59.000Z

452

Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements in DOE O 5480.19, Conduct of Operations Requirements Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. This is an open-book evaluation. Complete the questions, and submit your answers (hand-written or electronically) to the Training Center. Someone will check and grade your answers. If you achieve a score of at least 80%, you will receive a completion certificate. Nuclear Facility Safety Basis Fundamentals Self-Study Guide Review Questions More Documents & Publications U.S. Department of Energy Oak Ridge Operations Nuclear Facility Safety Basis Fundamentals, Self-Study Guide

453

NIST Laser Applications Group Homepage  

Science Conference Proceedings (OSTI)

Laser Applications Group. Welcome. The Laser Applications Group advances laser technology for applications in optical ...

2012-05-10T23:59:59.000Z

454

DOE Requires Air-Con International to Cease Sales of Inefficient Air  

NLE Websites -- All DOE Office Websites (Extended Search)

Requires Air-Con International to Cease Sales of Inefficient Requires Air-Con International to Cease Sales of Inefficient Air Conditioners and Proposes Penalties DOE Requires Air-Con International to Cease Sales of Inefficient Air Conditioners and Proposes Penalties September 21, 2010 - 6:43pm Addthis The Department has issued a Notice of Noncompliance Determination and Proposed Civil Penalty to Air-Con, International, requiring Air-Con to cease the sale of certain air-conditioning systems in the United States and proposing a civil penalty of $231,090 for sales of these products in violation of the applicable energy efficiency standards. This action reflects the Department's continued commitment to act aggressively to remove unlawful products from the market. In March, 2010, the Department issued a subpoena requiring Air-Con to

455

Advanced Light Water Reactor utility requirements document. Part 1, Executive summary  

SciTech Connect

The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document`s primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

1986-06-01T23:59:59.000Z

456

Comparison of 2006 IECC and 2009 IECC Commercial Energy Code Requirements for Kansas City, MO  

SciTech Connect

This report summarizes code requirements and energy savings of commercial buildings in climate zone 4 built to the 2009 IECC when compared to the 2006 IECC. In general, the 2009 IECC has higher insulation requirements for exterior walls, roof, and windows and have higher efficiency requirements for HVAC equipment (HVAC equipment efficiency requirements are governed by National Appliance Conversion Act of 1987 (NAECA), and are applicable irrespective of the IECC version adopted). The energy analysis results show that residential and nonresidential commercial buildings meeting the 2009 IECC requirements save between 6.1% and 9.0% site energy, and between 6.4% and 7.7% energy cost when compared to 2006 IECC. Analysis also shows that semiheated buildings have energy and cost savings of 3.9% and 5.6%.

Huang, Yunzhi; Gowri, Krishnan

2011-03-22T23:59:59.000Z

457

Requirements-Driven modeling of the web service execution and adaptation lifecycle  

Science Conference Proceedings (OSTI)

The increasing popularity of Web services for application integration has resulted in a large body of research on Web service composition. However, the major lacuna so far in Web service composition is the lack of a holistic requirements-driven approach ...

N. C. Narendra; B. Orriens

2006-12-01T23:59:59.000Z

458

STATE OF CALIFORNIA AIR, WATER SIDE SYSTEM, SERVICE HOT WATER & POOL REQUIREMENTS  

E-Print Network (OSTI)

(e) Outdoor Damper Control 122(f) Isolation Zones 122(g) Pipe Insulation 123 Duct Insulation 124 or Specification2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) Pipe Insulation PRESCRIPTIVE need to match the building plans schedule or specifications. If a requirement is not applicable, put "N

459

Marin County - Green Building Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marin County - Green Building Requirements Marin County - Green Building Requirements Eligibility Commercial Construction Residential Savings For Heating & Cooling Home...

460

Marking Requirements | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

Submittal Basics Submittal Basics Marking Requirements Print page Print page Email page Email page Categories of Controlled Unclassified STI DOE and Major Site/Facility Management Contractors Sample Cover and Title Page for Unclassified Unlimited STI Sample Cover and Title Page for Controlled Unclassified STI Financial Assistance Recipients and Non-major Contractors Sample Cover and Title Page for Unclassified Unlimited STI Sample Cover and Title Page for Controlled Unclassified STI Resources for classified and controlled unclassified marking requirements: DOE CMPC Marking Resource DOE O 475.2A, Identifying Classified Information 10 CFR 1017, Identification and Protection of Unclassified Controlled Nuclear Information DOE M 471.3-1, Manual for Identifying and Protecting Official Use

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Depleted Uranium Uses: Regulatory Requirements and Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Depleted Uranium Uses Depleted Uranium Uses Regulatory Requirements Regulatory Requirements and Issues and Issues Nancy L. Ranek Nancy L. Ranek Argonne National Laboratory Argonne National Laboratory August 5, 1998 August 5, 1998 Beneficial Reuse '98 Beneficial Reuse '98 Knoxville, TN Knoxville, TN NOTES Work Performed for: Office of Facilities (NE-40) Office of Nuclear Energy, Science and Technology U.S. Department of Energy Work Performed by: Environmental Assessment Division Argonne National Laboratory 955 L'Enfant Plaza North, S.W. Washington, D.C. 20024 Phone: 202/488-2417 E-mail: ranekn@smtplink.dis.anl.gov 2 2 2 Programmatic Environmental Programmatic Environmental Impact Statement (PEIS) Impact Statement (PEIS) Draft PEIS Published 12/97 * Preferred Alternative = 100% Use

462

Documentation Requirements for Pressurized Experiment Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Documentation Requirements for Pressurized Experiment Apparatus Documentation Requirements for Pressurized Experiment Apparatus PSSC NOTE01 15-Jan-2013 When bringing a piece of apparatus to the APS for an experiment that will involve pressure, whether it is to be used on a beamline during a measurement or in a laboratory to prepare the sample prior to the experiment, the hazards associated with the equipment must be reviewed. To review the equipment and make any recommendations, a certain level of documentation must be provided by the experimenter. The length and depth of the documentation should be commensurate with the complexity of the system. 1. Description of apparatus a. Description of the assembly and operation of the system. b. State the maximum working pressure, working fluid (liquid or gas) used to

463

Hydrogen Storage Requirements for Fuel Cell Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

GENERAL MOTORS GENERAL MOTORS HYDROGEN STORAGE REQUIREMENTS FOR FUEL CELL VEHICLES Brian G. Wicke GM R&D and Planning DOE Hydrogen Storage Workshop August 14-15, 2002 Argonne National Laboratory General Motors Fuel Cell Vehicles * GM fuel cell vehicle Goal - be the first to profitably sell one million fuel cell vehicles * Fuel cell powerplant must be suitable for a broad range of light-duty vehicles (not just niche) * UNCOMPROMISED performance & reliability are REQUIRED * SAFETY IS A GIVEN * Evolutionary and Revolutionary vehicle designs are included-GM AUTONOMY-as long as the customer is (more than) satisfied GENERAL MOTORS AUTONOMY GENERAL MOTORS AUTONOMY General Motors Fuel Cell Vehicles * Focus on PEM fuel cell technology * Must consider entire hydrogen storage & (unique) fuel delivery systems,

464

RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE  

Science Conference Proceedings (OSTI)

Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

Watkins, R.; Leduc, D.

2011-03-24T23:59:59.000Z

465

Report of the Federal Internetworking Requirements Panel  

SciTech Connect

The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

1994-05-31T23:59:59.000Z

466

Monitoring Control Applications at CERN  

E-Print Network (OSTI)

The Industrial Controls and Engineering (EN-ICE) group [1] of the Engineering Department at CERN has produced, and is responsible for the operation of around 60 applications, which control critical processes in the domains of cryogenics, quench protection systems, power interlocks for the Large Hadron Collider and other subsystems of the accelerator complex. These applications require 24/7 operation and a quick reaction to problems. For this reason the EN-ICE group is presently developing the Monitoring Operation of cOntrols Networks (MOON) tool to detect, anticipate and inform of possible anomalies in the integrity of the applications. The tool builds on top of Simatic WinCC Open Architecture (WinCC OA) [2] SCADA and makes usage of the Joint COntrols Project (JCOP) [3] and the UNified INdustrial COntrol System (UNICOS) [4] Frameworks developed at CERN. The tool provides centralized monitoring and software management of the different elements integrating the control systems like Windows and L...

Bernard, F; Milcent, H; Petrova, L B; Varela, F

2011-01-01T23:59:59.000Z

467

AMI Risk Assessment and Security Requirements  

Science Conference Proceedings (OSTI)

Advanced Metering Infrastructure (AMI) is a transforming technology that has broad impact on the energy market and its consumers. AMI allows utilities to balance supply, demand, and capacity making a smarter, more efficient, grid by pushing aspects of grid monitoring and control out to the endpoints of delivery. Stakeholders are implementing the systems and technologies required to deploy AMI today. AMI systems promise to provide advanced energy monitoring and recording, sophisticated tariff/rate program...

2009-12-18T23:59:59.000Z

468

Handbook of methods for risk-based analysis of Technical Specification requirements  

SciTech Connect

Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: quantitatively evaluate the risk impact and justify changes based on objective risk arguments. Provide a defensible basis for these requirements for regulatory applications. The United States Nuclear Regulatory Commission (USNRC) Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations.

Samanta, P.K.; Vesely, W.E.

1993-12-31T23:59:59.000Z

469

Building Envelope Requirements Overview Page 3-1 3 Building Envelope Requirements  

E-Print Network (OSTI)

. For the building envelope, field verification and diagnostic testing procedures exist for insulation qualityBuilding Envelope Requirements ­ Overview Page 3-1 3 Building Envelope Requirements The building. The principal components of heating loads are building envelope infiltration as well as conduction losses

470

Utility market and requirements for a solar thermophotovoltaic system  

Science Conference Proceedings (OSTI)

There is a growing need for clean affordable electric power generation in both the U.S. and internationally and solar thermophotovoltaic (STPV) can meet the needs of this market. This paper investigates the utility grid market applicable to a solar thermophotovoltaic power generating system. It finds that a large international electrical market and a smaller U.S. electrical market exist today but the U.S. market will grow by the year 2005 to a level that would easily support the high production level required for solar systems to be cost effective. Factors which could influence this market and the system characteristics considered by utilities in selecting future power systems such as levelized energy cost, dispatchability, environmental, etc., for both the grid and remote market are discussed. The main competition for this market and the operating performance of this competition are described. A conceptual design of a STPV power system is presented, the operation is described, and how the performance meets the utility requirements is discussed. The relationship between the cost of the TPV conversion unit and the system efficiency of the STPV system is given for both the grid and remote markets that it must meet in order to be competitive. {copyright} {ital 1996 American Institute of Physics.}

Stone, K. [McDonnell Douglas Aerospace, 5301 Bolsa Avenue, Huntington Beach, California 92647 (United States); McLellan, S. [Arizona Public Service, P.O. Box 53999 Phoenix, Arizona (United States)

1996-02-01T23:59:59.000Z

471

Analysis of IECC2003 Chiller Heat Recovery for Service Water Heating Requirement for New York State  

Science Conference Proceedings (OSTI)

The state of New York asked the U.S. Department of Energy to evaluate the cost-effectiveness of the requirement for Heat Recovery for Service Water Heating that exists in the 2003 International Energy Conservation Code to determine whether this requirement should be adopted into the New York State Energy Code. A typical hotel application that would trigger this requirement was examined using whole building simulation software to generate baseline annual chiller and service hot water loads, and a spreadsheet was used to examine the energy savings potential for heat recovery using hourly load files from the simulation. An example application meeting the code requirement was developed, and the energy savings, energy cost savings, and first costs for the heat recovery installation were developed. The calculated payback for this application was 6.3 years using 2002 New York state average energy costs. This payback met the minimum requirements for cost effectiveness established for the state of New York for updating the commercial energy conservation code.

Winiarski, David W.

2004-08-15T23:59:59.000Z

472

Transportation Applications  

DOE Green Energy (OSTI)

The purpose of this project is to systematically identify and examine possible near and long-term ecological and environmental effects from the production of hydrogen from various energy sources based on the DOE hydrogen production strategy and the use of that hydrogen in transportation applications. This project uses state-of-the-art numerical modeling tools of the environment and energy system emissions in combination with relevant new and prior measurements and other analyses to assess the understanding of the potential ecological and environmental impacts from hydrogen market penetration. H2 technology options and market penetration scenarios will be evaluated using energy-technology-economics models as well as atmospheric trace gas projections based on the IPCC SRES scenarios including the decline in halocarbons due to the Montreal Protocol. Specifically we investigate the impact of hydrogen releases on the oxidative capacity of the atmosphere, the long-term stability of the ozone layer due to changes in hydrogen emissions, the impact of hydrogen emissions and resulting concentrations on climate, the impact on microbial ecosystems involved in hydrogen uptake, and criteria pollutants emitted from distributed and centralized hydrogen production pathways and their impacts on human health, air quality, ecosystems, and structures under different penetration scenarios

Wuebbles, D.J.; Dubey, M.K., Edmonds, J.; Layzell, D.; Olsen, S.; Rahn, T.; Rocket, A.; Wang, D.; Jia, W.

2010-06-01T23:59:59.000Z

473

Functionalized nanoparticles for sensor applications.  

Science Conference Proceedings (OSTI)

We will describe our work on functionalized arrays of nanoparticles crosslinked with short conducting molecules that contain sensing functionalities. These bridging ligands modulate their conductivity based on their interaction with analytes. This functionalized nanoparticles organic ligand composite material once it is assembled between nanogaps electrodes will provide nanosized sensors that can be easily interrogated. These nanogap sensors will be engineered so that they can be fabricated into arrays of different sensor elements. This project consists of a number of different requirements that must be met in order to enable the use of functionalized nanoparticles for sensor applications. The first requirement is the appropriately functionalized nanoparticle. The second is a method to assemble the particles. The third requirement is the generation of a nanogap to contain the nanoparticles. The successes in each of these areas will be discussed as will the sensing behavior of the final films.

Simonson, Robert Joseph; Childs, Kenton David; Howell, Stephen Wayne; Dirk, Shawn M.; Wheeler, David Roger

2005-09-01T23:59:59.000Z

474

Method and apparatus for collaborative use of application program  

DOE Patents (OSTI)

Method and apparatus permitting the collaborative use of a computer application program simultaneously by multiple users at different stations. The method is useful with communication protocols having client/server control structures. The method of the invention requires only a sole executing copy of the application program and a sole executing copy of software comprising the invention. Users may collaboratively use a set of application programs by invoking for each desired application program one copy of software comprising the invention.

Dean, Craig D. (Sandia Park, NM)

1994-01-01T23:59:59.000Z

475

Lawrence Livermore National Laboratory Emergency Response Capability Baseline Needs Assessment Requirement Document  

SciTech Connect

This revision of the LLNL Fire Protection Baseline Needs Assessment (BNA) was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by Martin Gresho, Sandia/CA Fire Marshal. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response. The original LLNL BNA was created on April 23, 1997 as a means of collecting all requirements concerning emergency response capabilities at LLNL (including response to emergencies at Sandia/CA) into one BNA document. The original BNA documented the basis for emergency response, emergency personnel staffing, and emergency response equipment over the years. The BNA has been updated and reissued five times since in 1998, 1999, 2000, 2002, and 2004. A significant format change was performed in the 2004 update of the BNA in that it was 'zero based.' Starting with the requirement documents, the 2004 BNA evaluated the requirements, and determined minimum needs without regard to previous evaluations. This 2010 update maintains the same basic format and requirements as the 2004 BNA. In this 2010 BNA, as in the previous BNA, the document has been intentionally divided into two separate documents - the needs assessment (1) and the compliance assessment (2). The needs assessment will be referred to as the BNA and the compliance assessment will be referred to as the BNA Compliance Assessment. The primary driver for separation is that the needs assessment identifies the detailed applicable regulations (primarily NFPA Standards) for emergency response capabilities based on the hazards present at LLNL and Sandia/CA and the geographical location of the facilities. The needs assessment also identifies areas where the modification of the requirements in the applicable NFPA standards is appropriate, due to the improved fire protection provided, the remote location and low population density of some the facilities. As such, the needs assessment contains equivalencies to the applicable requirements. The compliance assessment contains no such equivalencies and simply assesses the existing emergency response resources to the requirements of the BNA and can be updated as compliance changes independent of the BNA update schedule. There are numerous NFPA codes and standards and other requirements and guidance documents that address the subject of emergency response. These requirements documents are not always well coordinated and may contain duplicative or conflicting requirements or even coverage gaps. Left unaddressed, this regulatory situation results in frequent interpretation of requirements documents. Different interpretations can then lead to inconsistent implementation. This BNA addresses this situation by compiling applicable requirements from all identified sources (see Section 5) and analyzing them collectively to address conflict and overlap as applicable to the hazards presented by the LLNL and Sandia/CA sites (see Section 7). The BNA also generates requirements when needed to fill any identified gaps in regulatory coverage. Finally, the BNA produces a customized simple set of requirements, appropriate for the DOE protection goals, such as those defined in DOE O 420.1B, the hazard level, the population density, the topography, and the site layout at LLNL and Sandia/CA that will be used as the baseline requirements set - the 'baseline needs' - for emergency response at LLNL and Sandia/CA. A template approach is utilized to accomplish this evaluation for each of the nine topical areas that comprise the baseline needs for emergency response. The basis for conclusions reached in determining the baseline needs for each of the topical areas is presented in Sections 7.1 through 7.9. This BNA identifies only mandatory requirements and establishes the minimum performance criteria. The minimum performance criteria may not be the level of performance desired Lawrence Livermore National Laboratory or Sandia/CA

Sharry, J A

2009-12-30T23:59:59.000Z

476

Office Buildings: Developer's Requirements- Consultant's Solutions  

E-Print Network (OSTI)

Sustainability has recently become a recognized feature in office developments. This lecture will focus on the motivation for a developer to introduce sustainability to a project and also on the approach of MEP consultants to match the new requirements. From a developers point of view many design decisions are based on cost issues. If “sustainable systems” match or exceed other solutions in terms of low investment costs, minimal space requirements or operating costs it is very likely for these systems to be introduced to projects. With the recent interest of tenants in “green issues” sustainability is now also being used as a marketing point for developments. This new market interest has arrived from almost no-where. In a market research from Vivico from (2004) our “typical” tenant did not show any great interest in ecological issues. These new requirements in general demand a quick adaption from investors. Vivico has always shown a great commitment to sustainability. Our track record shows a sound knowledge with technical solution such as geothermal energy systems or developments following comprehensive sustainability criteria from the scheme design through to fit-out. Vivico was also involved in pilot certifications for the German EnEV (European directive on energy performance of buildings. Another important motivation for energy-saving solutions are new government regulations, such as the German EnEV. The focus within project developments is to achieve good energy rating. Unfortunately, the government’s perspective of the EnEV is based on an overall value, the primary energy consumption of a building. As for example the primary energy factor in case of district heating is very much dependant on the “energy quality” of local utility suppliers, this overall value of the EnEV is not only dependant on the commitment of an investor to energy-saving solutions, but also to factors outside his reach. In order to be able to introduce even more “sustainability” to projects, some current problems have to overcome. German legal requirements define summer indoor temperatures and a noncompliance can lead to rent reductions or lease terminations. A softer approach as far as defining temperatures in working environments is concerned could help introduce other energy-saving systems. Some tenant target temperatures are even fixed within the lease contract over and above the legal requirements. If more of our tenants understood the impact of such requirements, provisions for overcapacity within cooling systems could be reduced. The technical part of the lecture gives a brief overview of current options to reach energy efficient and sustainable building solutions. It will be distinguished between active and passive means; for example the reduction of energy usage by using good building design concepts, or using natural resources and highly efficient building technologies to save fossil fuels. New technologies will also be highlighted with a view to future developments. Based on the various options described, a current Vivico Real Estate development, with Ebert- Ingenieure as their MEP-consultants, will be presented. The design process from the first steps and considerations through to the final solutions will be described.

Forster, P.; Arndt, J.

2008-10-01T23:59:59.000Z

477

Survey paper: A survey of applications and requirements of unique identification systems and RFID techniques  

Science Conference Proceedings (OSTI)

The paper contains an overview of unique identification issues and of the various radio frequency identification techniques that are available now or will become available in the short term. The paper also compares RFID with traditional ID technologies. ... Keywords: Automatic identification, Data transfer, Identifier-based operations, Supply-chain

Elisabeth Ilie-Zudor; Zsolt Kemény; Fred van Blommestein; László Monostori; André van der Meulen

2011-04-01T23:59:59.000Z

478

Monitoring Precipitation over the Arctic Terrestrial Drainage System: Data Requirements, Shortcomings, and Applications of Atmospheric Reanalysis  

Science Conference Proceedings (OSTI)

An effort is under way aimed at historical analysis and monitoring of the pan-Arctic terrestrial drainage system. A key element is the provision of gridded precipitation time series that can be readily updated. This has proven to be a daunting ...

Mark C. Serreze; Martyn P. Clark; David H. Bromwich

2003-04-01T23:59:59.000Z

479

NERSC-BES-Requirements-Yelick10.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Basic Energy Basic Energy Science Research Katherine Yelick NERSC Director Requirements Workshop NERSC Mission Accelerate the pace of scientific discovery for all DOE Office of Science (SC) research through computing and data systems and services. Efficient algorithms + flexible software + effective machines great computational science. 2 2010 Allocations NERSC is the Production Facility for DOE Office of Science * NERSC serves a large population Approximately 3000 users, 400 projects, 500 code instances * Focus on "unique" resources - Expert consulting and other services - High end computing systems - High end storage systems - Interface to high speed networking * Science-driven - Machine procured competitively using

480

URAT: astrometric requirements and design history  

E-Print Network (OSTI)

The U.S. Naval Observatory Robotic Astrometric Telescope (URAT) project aims at a highly accurate (5 mas), ground-based, all-sky survey. Requirements are presented for the optics and telescope for this 0.85 m aperture, 4.5 degree diameter field-of-view, specialized instrument, which are close to the capability of the industry. The history of the design process is presented as well as astrometric performance evaluations of the toleranced, optical design, with expected wavefront errors included.

N. Zacharias; U. Laux; A. Rakich; H. Epps

2006-06-08T23:59:59.000Z

Note: This page contains sample records for the topic "grid-tied applications require" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Feedback Requirements for SASE-FELs  

SciTech Connect

The operation of a Self Amplified Spontaneous Emission (SASE) Free Electron Lasers (FEL) at soft and hard X-ray wavelengths driven by a high brightness electron beam imposes strong requirements on the stability of the accelerator and feedback systems are necessary to both guarantee saturation of the SASE process as well as a stable photon beam for user experiments. Diagnostics for the relevant transverse and longitudinal beam parameters are presented and various examples of feedback systems for bunches with low repetition rate as well as systems for intra bunch train feedbacks are discussed.

Loos, Henrik; /SLAC

2012-07-06T23:59:59.000Z

482

10 CFR 850 Implementation of Requirements  

Science Conference Proceedings (OSTI)

10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPP is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures that ES&H practices across LLNL are developed in a consistent manner. Other implementing documents, such as the ES&H Manual, are integral in effectively implementing 10 CFR 850.

Lee, S

2012-01-05T23:59:59.000Z

483

Resources required for topological quantum factoring  

Science Conference Proceedings (OSTI)

We consider a hypothetical topological quantum computer composed of either Ising or Fibonacci anyons. For each case, we calculate the time and number of qubits (space) necessary to execute the most computationally expensive step of Shor's algorithm, modular exponentiation. For Ising anyons, we apply Bravyi's distillation method [S. Bravyi, Phys. Rev. A 73, 042313 (2006)] which combines topological and nontopological operations to allow for universal quantum computation. With reasonable restrictions on the physical parameters we find that factoring a 128-bit number requires approximately 10{sup 3} Fibonacci anyons versus at least 3x10{sup 9} Ising anyons. Other distillation algorithms could reduce the resources for Ising anyons substantially.

Baraban, M. [Department of Physics, Yale University, 217 Prospect Street, New Haven, Connecticut 06511 (United States); Bonesteel, N. E. [Department of Physics and National High Magnetic Field Laboratory, Florida State University, Tallahassee, Florida 32310 (United States); Simon, S. H. [Rudolf Peierls Centre for Theoretical Physics, Oxford University, 1 Keble Road, Oxford OX1 3NP (United Kingdom)

2010-06-15T23:59:59.000Z

484

Application for COR Certification-Recertification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEMORANDUM FOR SITE ACQUISITION CAREER MANAGER FROM: SUBJECT: Application for COR Certification- In accordance with DOE Order 361.1B, paragraph 4.B, the following application for COR certification is submitted, based on completion of the required minimum experience and training and my existing and/or pending COR appointment. E-mail address: _____________________ Program Office: Phone: ____________________________ Duty Station (city/state): I am COR to a or ________________________ under Contract/Solicitation number _________________________ 1. Previous certification (attached): Date last issued or renewed:____________

485

Nitric acid requirement for treating sludge  

DOE Green Energy (OSTI)

The hydroxylamine nitrate (HAN) precipitate hydrolysis process produces sufficient oxidant (nitrate) such that the resulting blend of formic acid treated sludge and the aqueous product from hydrolysis (PHA) produces a melter feed of acceptable redox (i.e. Fe+2/Total Fe <0.33). With implementation of Late Washing (to reduce the nitrite content of the tetraphenyborate slurry produced during In-Tank Precipitation to 0.01M or less), HAN is no longer required during hydrolysis. As a result, the nitrate content of the melter feed will be reduced greater than an order-of-magnitude and the resulting melter feed produced will be too reducing. If formic acid treatment of the sludge is retained, it will be necessary to trim the melter feed with an oxidant to attain a proper redox. Rather than trimming the melter feed with an oxidant subsequent to the SRAT cycle in which formic acid is used to acidify the sludge, the Savannah River Technology Center (SRTC) has recommended this be accomplished by conversion to nitric acid addition to the Sludge Receipt and Adjustment Tank (SRAT) in place of formic acid (1). This memorandum specifies the stoichiometric bases for determining the nitric acid requirement for the SRAT.

Hsu, C.W.

1992-09-04T23:59:59.000Z

486

Length requirements for numerical-relativity waveforms  

E-Print Network (OSTI)

One way to produce complete inspiral-merger-ringdown gravitational waveforms from black-hole-binary systems is to connect post-Newtonian (PN) and numerical-relativity (NR) results to create "hybrid" waveforms. Hybrid waveforms are central to the construction of some phenomenological models for GW search templates, and for tests of GW search pipelines. The dominant error source in hybrid waveforms arises from the PN contribution, and can be reduced by increasing the number of NR GW cycles that are included in the hybrid. Hybrid waveforms are considered sufficiently accurate for GW detection if their mismatch error is below 3% (i.e., a fitting factor about 0.97). We address the question of the length requirements of NR waveforms such that the final hybrid waveforms meet this requirement, considering nonspinning binaries with q = M_2/M_1 \\in [1,4] and equal-mass binaries with \\chi = S_i/M_i^2 \\in [-0.5,0.5]. We conclude that for the cases we study simulations must contain between three (in the equal-mass nonspinning case) and ten (the \\chi = 0.5 case) orbits before merger, but there is also evidence that these are the regions of parameter space for which the least number of cycles will be needed.

Mark Hannam; Sascha Husa; Frank Ohme; P. Ajith

2010-08-17T23:59:59.000Z

487

Length requirements for numerical-relativity waveforms  

E-Print Network (OSTI)

One way to produce complete inspiral-merger-ringdown gravitational waveforms from black-hole-binary systems is to connect post-Newtonian (PN) and numerical-relativity (NR) results to create ``hybrid'' waveforms. Hybrid waveforms are central to the construction of some phenomenological models for GW search templates, and for tests of GW search pipelines. The dominant error source in hybrid waveforms arises from the PN contribution, and can be reduced by increasing the number of NR GW cycles that are included in the hybrid. Hybrid waveforms are considered sufficiently accurate for GW detection if their mismatch error is below 3% (i.e., a fitting factor about 0.97). We address the question of the length requirements of NR waveforms such that the final hybrid waveforms meet this requirement, considering nonspinning binaries with q = M_2/M_1 \\in [1,4] and equal-mass binaries with \\chi = S_i/M_i^2 \\in [-0.5,0.5]. We conclude that for the cases we study simulations must contain between three (in the equal-mass nonsp...

Hannam, Mark; Ohme, Frank; Ajith, P

2010-01-01T23:59:59.000Z

488

Military power requirements and backup power considerations  

Science Conference Proceedings (OSTI)

All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs.

Botts, T.E.

1986-01-01T23:59:59.000Z

489

Strategic forces: Future requirements and options  

SciTech Connect

In the wake of the collapse of the Warsaw Pact and the apparent ending of the Cold War, there have been renewed calls for radical cuts in US strategic forces to levels far below the 10,000 or so warheads allowed each side under the current START proposal. Since it now appears that NATO for the first time will have the capability to defeat a Soviet conventional attack without the necessity of threatening to resort to nuclear weapons, this should pave the way for the rethinking of US strategy and the reduction of US strategic weapons requirements. In this new environment, it seems plausible that, with a modification of the Flexible Response doctrine to forego attempts to disarm the Soviet Union, deterrence could be maintained with 1500 or so survivable strategic weapons. With a new strategy that confined US strategic weapons to the role of deterring the use of nuclear weapons by other countries, a survivable force of about 500 weapons would seem sufficient. With this premise, the implications for the US strategic force structure are examined for two cases: a treaty that allows each side 3000 warheads and one that allows each side 1000 warheads. In Part 1 of this paper, the weapons requirements for deterrence are examined in light of recent changes in the geopolitical environment. In Part 2, it is assumed that the President and Congress have decided that deep cuts in strategic forces are acceptable. 128 refs., 12 figs., 12 tabs. (JF)

Speed, R.D.

1990-11-01T23:59:59.000Z

490

Safeguard Requirements for Fusion Power Plants  

Science Conference Proceedings (OSTI)

Nuclear proliferation risks from magnetic fusion energy associated with access to fissile materials can be divided into three main categories: 1) clandestine production of fissile material in an undeclared facility, 2) covert production and diversion of such material in a declared and safeguarded facility, and 3) use of a declared facility in a breakout scenario, in which a state openly produces fissile material in violation of international agreements. The degree of risk in each of these categories is assessed, taking into account both state and non-state actors, and it is found that safeguards are required for fusion energy to be highly attractive from a non-proliferation standpoint. Specific safeguard requirements and R&D needs are outlined for each category of risk, and the technical capability of the ITER experiment, under construction, to contribute to this R&D is noted. A preliminary analysis indicates a potential legal pathway for fusion power systems to be brought under the Treaty for the Non-Proliferation of Nuclear Weapons. "Vertical" proliferation risks associated with tritium and with the knowledge that can be gained from inertial fusion energy R&D are outlined.

Robert J. Goldston and Alexander Glaser

2012-08-10T23:59:59.000Z

491

Utilization requirements. A Southern California gas company project SAGE report: utilization requirements. [Solar Assisted Gas Energy  

SciTech Connect

Utilization requirements are given and comparisons made of two phase III SAGE (solar assisted gas energy) installations in California: (1) a retrofit installation in an existing apartment building in El Toro, and (2) an installation in a new apartment building in Upland. Such testing in the field revealed the requirements to be met if SAGE-type installations are to become commercially practical on a widespread basis in electric and gas energy usage.

Barbieri, R.; Schoen, R.; Hirshberg, A.S.

1978-01-01T23:59:59.000Z

492

MEMORANDUM FOR ACQUISITION CAREER MANAGER FROM: APPLICANT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a minimum of one year contracting experience (SERIES a minimum of one year contracting experience (SERIES 1102).Please specify month and year of entry into the contracting field: ________/____ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____Training requirements: Send all certificates for applicable courses below to the SACM FAC-C Level I TRAINING REQUIREMENTS Course Number Course Name How did you take it? Date Completed Number of CLPs CON100 Shaping Smart Business

493

MEMORANDUM FOR ACQUISITION CAREER MANAGER FROM: APPLICANT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 years of Contracting experience 2 years of Contracting experience ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____Training requirements: Send all certificates for applicable courses below to the SACM FAC-C Level II TRAINING REQUIREMENTS TRAINING Course Number Course Name How did you take it? Date Completed Number of CLPs CON 214 or FCN 214 Business Decisions for Contracting Chhhhh hh hhhh h MM/DD/YYYY Digit < 40 CON 213 or FCN 215 Intermediate

494

Anniversary Scholarship Application Form  

E-Print Network (OSTI)

at the University of Cambridge should complete the application form below and send it to The Pakistan Application Pakistan. Pakistan nationals who attend schools outside Pakistan are not eligible. 2. Applicants must complete the scholarship application form should be submitted to: The Pakistan Application Centre Cambridge

Travis, Adrian

495

Federal Energy Management Program: Energy Management Requirements by Law  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Energy Management Requirements by Law and Regulation to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Facebook Tweet about Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Twitter Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Google Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Delicious Rank Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Digg Find More places to share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on AddThis.com... Requirements by Subject Requirements by Regulation

496

Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2  

SciTech Connect

This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

Cote, R.F.

1993-11-01T23:59:59.000Z

497

Land use requirements for ground-mounted solar power facilities. | OpenEI  

Open Energy Info (EERE)

Land use requirements for ground-mounted solar power facilities. Land use requirements for ground-mounted solar power facilities. Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

498

NBP RFI: Communications Requirements- Reply Comments of AT&T Inc. |  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements- Reply Comments of AT&T Inc. Requirements- Reply Comments of AT&T Inc. NBP RFI: Communications Requirements- Reply Comments of AT&T Inc. AT&T Inc., on behalf of itself and its affiliates ("AT&T"), respectfully submits these reply comments in response to the Department Of Energy"s Request for Information ("RFI") on the communications requirements of electric utilities in Smart Grid deployments.1 In its initial comments, AT&T highlighted the expanding demand for network connectivity and how utilities can benefit from leveraging new network technologies deployed by commercial communications operators to optimize the performance, scalability, security, reliability and cost effectiveness of their Smart Grid applications deployments. Commercial communications

499

Extending and automating a Systems-Theoretic hazard analysis for requirements generation and analysis.  

SciTech Connect

Systems Theoretic Process Analysis (STPA) is a powerful new hazard analysis method designed to go beyond traditional safety techniques - such as Fault Tree Analysis (FTA) - that overlook important causes of accidents like flawed requirements, dysfunctional component interactions, and software errors. While proving to be very effective on real systems, no formal structure has been defined for STPA and its application has been ad-hoc with no rigorous procedures or model-based design tools. This report defines a formal mathematical structure underlying STPA and describes a procedure for systematically performing an STPA analysis based on that structure. A method for using the results of the hazard analysis to generate formal safety-critical, model-based system and software requirements is also presented. Techniques to automate both the analysis and the requirements generation are introduced, as well as a method to detect conflicts between the safety and other functional model-based requirements during early development of the system.

Thomas, John (Massachusetts Institute of Technology)

2012-05-01T23:59:59.000Z

500

Microsoft Word - CERTIFICATION LEVEL REQUIREMENTS.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CERTIFICATION LEVEL CERTIFICATION LEVEL The CEG is intended to provide program secretarial officers and field element managers (including operations offices, site offices, area offices, project offices, and service centers) with the requirements and guidelines for evaluating PMCDP candidate competencies and requests for equivalencies at all four certification levels and continuing education. Persons planning to be certified under the PMCDP may attain certification levels with the following total project cost (TPC) limits: * Certification Level 4: TPC exceeding $400 million (M) * Certification Level 3: TPC greater than $100M and equal to or less than $400M * Certification Level 2: TPC greater than $20M and equal to or less than $100M * Certification Level 1: TPC greater than $5M and equal to or less than $20M