1

Piloting the Smart Grid | Open Energy Information  

Open Energy Info (EERE)

Piloting the Smart Grid Piloting the Smart Grid Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Piloting the Smart Grid Focus Area: Crosscutting Topics: Best Practices Website: www.smartgridnews.com/artman/uploads/1/Piloting_the_smart_grid__05-29- Equivalent URI: cleanenergysolutions.org/content/piloting-smart-grid Language: English Policies: "Deployment Programs,Regulations,Financial Incentives" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Demonstration & Implementation Regulations: Cost Recovery/Allocation This paper provides guidance regarding when and how Smart Grid piloting studies should be conducted along with examples from several recent pilots that involved dynamic pricing, a key element of the smart grid. Smart Grid

2

Weatherization Pilot Projects  

Broader source: Energy.gov [DOE]

Webinars, fact sheets, and other information on Weatherization Assistance Program's Sustainable Energy Resources for Consumers and Weatherization Innovation Pilot Program projects.

3

National Grid Deep Energy Retrofit Pilot  

SciTech Connect (OSTI)

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wider adoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gauge long-term energy performance, durability, and occupant comfort.

Neuhauser, K.

2012-03-01T23:59:59.000Z

4

Obama Administration Announces Job-Creating Grid Modernization Pilot  

Broader source: Energy.gov (indexed) [DOE]

Job-Creating Grid Modernization Job-Creating Grid Modernization Pilot Projects Obama Administration Announces Job-Creating Grid Modernization Pilot Projects October 5, 2011 - 11:52am Addthis Washington, D.C. - Demonstrating its commitment to job creation and modernizing America's infrastructure, the Obama Administration today announced it would accelerate the permitting and construction of seven proposed electric transmission lines. This move will speed the creation of thousands of construction and operations jobs while transforming the nation's electric system into a modern, 21st century grid that is safer and more secure, and gives consumers more energy choices. "The President wants to get America working again. He is committed to cutting red tape and making immediate investments to put people to work

5

Recovery Act Smart Grid Projects | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Recovery Act Smart Grid Projects Recovery Act Smart Grid Projects Recovery Act Smart Grid Projects...

6

NREL: Distributed Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Projects Photo of two NREL engineers sitting in front of two computer monitors, discussing a project. NREL engineers work on data capture for micro-grid synchronization waveforms. Photo by Dennis Schroeder, NREL. NREL's distributed energy projects support the integration of new technologies into the electric power grid. This work involves industry, academia, other national laboratories, and various standards organizations. Learn more about our projects: Codes and standards Data collection and visualization Hawaii Clean Energy Initiative Microgrids Power systems modeling Solar Distributed Grid Integration (SunShot) Technology development Vehicle-to-Grid (V2G) Wind2Battery Printable Version Distributed Grid Integration Home Capabilities Projects Codes & Standards

7

The National Conversion Pilot Project  

SciTech Connect (OSTI)

The National Conversion Pilot Project (NCPP) is a recycling project under way at the U.S. Department of Energy (DOE) Rocky Flats Environmental Technology Site (RFETS) in Colorado. The recycling aim of the project is threefold: to reuse existing nuclear weapon component production facilities for the production of commercially marketable products, to reuse existing material (uranium, beryllium, and radioactively contaminated scrap metals) for the production of these products, and to reemploy former Rocky Flats workers in this process.

Roberts, A.V. [BNFL, Inc., Golden, CO (United States)

1995-12-31T23:59:59.000Z

8

Accelerating Successful Smart Grid Pilots | Open Energy Information  

Open Energy Info (EERE)

Accelerating Successful Smart Grid Pilots Accelerating Successful Smart Grid Pilots Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Accelerating Successful Smart Grid Pilots Focus Area: Renewable Energy Topics: Opportunity Assessment & Screening Website: www3.weforum.org/docs/WEF_EN_SmartGrids_Pilots_Report_2010.pdf Equivalent URI: cleanenergysolutions.org/content/accelerating-successful-smart-grid-pi Language: English Policies: "Deployment Programs,Regulations" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Demonstration & Implementation Regulations: "Enabling Legislation,Resource Integration Planning" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

9

Argonne TTRDC - Smart Grid - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Projects smart grid plug The SAE J-1772 plug-in vehicle connector facilitates both charging and communication. compact metrology A prototype of Argonne's compact metrology system smart grid radio FPGA Field programmable gate array (FPGA) technologies to develop improved software-defined radios for the smart grid Codes and Standards Development Argonne researchers are helping create codes and standards that will enable widespread adoption of electric-drive transportation with smart grid interoperability. For example, the Society of Automotive Engineers' (SAE) J1772 connection standard will enable manufacturers to build compatible connector plugs and vehicle sockets that support both charging and two-way communication with utility companies. Another standard, SAE J2847, will

10

Category:Smart Grid Projects - Integrated and Crosscutting Systems | Open  

Open Energy Info (EERE)

Smart Grid Projects - Integrated and Crosscutting Systems Smart Grid Projects - Integrated and Crosscutting Systems Jump to: navigation, search Smart Grid Projects - Integrated and Crosscutting Systems Pages in category "Smart Grid Projects - Integrated and Crosscutting Systems" The following 37 pages are in this category, out of 37 total. B Burbank Water and Power Smart Grid Project C Central Lincoln People's Utility District Smart Grid Project City of Anaheim Smart Grid Project City of Auburn, IN Smart Grid Project City of Fort Collins Utilities Smart Grid Project City of Leesburg, Florida Smart Grid Project City of Naperville, Illinois Smart Grid Project City of Wadsworth, OH Smart Grid Project Cuming County Public Power District Smart Grid Project D Detroit Edison Company Smart Grid Project Duke Energy Business Services LLC Smart Grid Project

11

Category:Smart Grid Investment Grant Projects | Open Energy Information  

Open Energy Info (EERE)

Investment Grant Projects Investment Grant Projects Pages in category "Smart Grid Investment Grant Projects" The following 98 pages are in this category, out of 98 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project Atlantic City Electric Company Smart Grid Project Avista Utilities Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project Burbank Water and Power Smart Grid Project C CenterPoint Energy Smart Grid Project Central Lincoln People's Utility District Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project

12

Grid4EU (Smart Grid Project) (Italy) | Open Energy Information  

Open Energy Info (EERE)

Grid4EU (Smart Grid Project) (Italy) Grid4EU (Smart Grid Project) (Italy) Jump to: navigation, search Project Name Grid4EU Country Italy Coordinates 41.910454°, 12.65625° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.910454,"lon":12.65625,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

13

Elforsk Smart grid programme (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Elforsk Smart grid programme (Smart Grid Project) Elforsk Smart grid programme (Smart Grid Project) Jump to: navigation, search Project Name Elforsk Smart grid programme Country SVEZIA Coordinates 60.128162°, 18.643501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":60.128162,"lon":18.643501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

14

Fieldtrail Mobile Smart Grid (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Fieldtrail Mobile Smart Grid (Smart Grid Project) Fieldtrail Mobile Smart Grid (Smart Grid Project) Jump to: navigation, search Project Name Fieldtrail Mobile Smart Grid Country Netherlands Headquarters Location Rosmalen, Netherlands Coordinates 51.719166°, 5.367222° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.719166,"lon":5.367222,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

15

Customer Value Proposition Smart Grid (KEL) (Smart Grid Project) | Open  

Open Energy Info (EERE)

Proposition Smart Grid (KEL) (Smart Grid Project) Proposition Smart Grid (KEL) (Smart Grid Project) Jump to: navigation, search Project Name Customer Value Proposition Smart Grid (KEL) Country Sweden Headquarters Location Gothenburg, Sweden Coordinates 57.696995°, 11.9865° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":57.696995,"lon":11.9865,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

16

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Texas Propane Vehicle Pilot Project Texas Propane Vehicle Pilot Project 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

17

Category:Smart Grid Projects - Electric Distributions Systems | Open Energy  

Open Energy Info (EERE)

Distributions Systems category. Distributions Systems category. Pages in category "Smart Grid Projects - Electric Distributions Systems" The following 13 pages are in this category, out of 13 total. A Atlantic City Electric Company Smart Grid Project Avista Utilities Smart Grid Project C Consolidated Edison Company of New York, Inc. Smart Grid Project E El Paso Electric Smart Grid Project H Hawaii Electric Co. Inc. Smart Grid Project M Memphis Light, Gas and Water Division Smart Grid Project Municipal Electric Authority of Georgia Smart Grid Project N Northern Virginia Electric Cooperative Smart Grid Project NSTAR Electric Company Smart Grid Project P Powder River Energy Corporation Smart Grid Project P cont. PPL Electric Utilities Corp. Smart Grid Project S Snohomish County Public Utilities District Smart Grid Project

18

Category:Smart Grid Projects - Advanced Metering Infrastructure | Open  

Open Energy Info (EERE)

Metering Infrastructure Metering Infrastructure Jump to: navigation, search Smart Grid Projects - Advanced Metering Infrastructure category Pages in category "Smart Grid Projects - Advanced Metering Infrastructure" The following 31 pages are in this category, out of 31 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project C CenterPoint Energy Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project City of Fulton, Missouri Smart Grid Project City of Glendale Water and Power Smart Grid Project City of Quincy, FL Smart Grid Project City of Westerville, OH Smart Grid Project

19

Category:Smart Grid Projects - Regional Demonstrations | Open Energy  

Open Energy Info (EERE)

Demonstrations Demonstrations Jump to: navigation, search Smart Grid Regional Demonstrations Projects category. Pages in category "Smart Grid Projects - Regional Demonstrations" The following 16 pages are in this category, out of 16 total. B Battelle Memorial Institute, Pacific Northwest Division Smart Grid Demonstration Project C Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Columbus Southern Power Company (doing business as AEP Ohio) Smart Grid Demonstration Project Consolidated Edison Company of New York, Inc. Smart Grid Demonstration Project K Kansas City Power & Light Company Smart Grid Demonstration Project L Long Island Power Authority Smart Grid Demonstration Project L cont. Los Angeles Department of Water and Power Smart Grid Demonstration Project

20

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2009 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2008 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

22

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Broader source: Energy.gov (indexed) [DOE]

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

23

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

24

Pilot Peak Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Pilot Peak Geothermal Project Pilot Peak Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Pilot Peak Geothermal Project Project Location Information Coordinates 38.342266666667°, -118.10361111111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.342266666667,"lon":-118.10361111111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

25

Grid Integration of Offshore Windparks (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

of Offshore Windparks (Smart Grid Project) of Offshore Windparks (Smart Grid Project) Jump to: navigation, search Project Name Grid Integration of Offshore Windparks Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

EcoGrid EU (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

(Smart Grid Project) (Smart Grid Project) Jump to: navigation, search Project Name EcoGrid EU Country Denmark Headquarters Location Bornholm, Denmark Coordinates 55.160427°, 14.866884° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.160427,"lon":14.866884,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

27

GridStat Cyber Security and Regional Deployment Project Report  

SciTech Connect (OSTI)

GridStat is a developing communication technology to provide real-time data delivery services to the electric power grid. It is being developed in a collaborative effort between the Electrical Power Engineering and Distributed Computing Science Departments at Washington State University. Improving the cyber security of GridStat was the principle focus of this project. A regional network was established to test GridStats cyber security mechanisms in a realistic environment. The network consists of nodes at Pacific Northwest National Laboratory, Idaho National Laboratory, and Washington State University. Idaho National Laboratory (INL) was tasked with performing the security assessment, the results of which detailed a number or easily resolvable and previously unknown issues, as well as a number of difficult and previously known issues. Going forward we recommend additional development prior to commercialization of GridStat. The development plan is structured into three domains: Core Development, Cyber Security and Pilot Projects. Each domain contains a number of phased subtasks that build upon each other to increase the robustness and maturity of GridStat.

Clements, Samuel L.

2009-02-18T23:59:59.000Z

28

Smart Grid Projects Are Improving Performance and Helping Consumers...  

Office of Environmental Management (EM)

Smart Grid Projects Are Improving Performance and Helping Consumers Better Manage their Energy Use Smart Grid Projects Are Improving Performance and Helping Consumers Better Manage...

29

46th Street Pilot Street Lighting Project  

E-Print Network [OSTI]

46th Street Pilot Street Lighting Project A Joint Venture: Hennepin County & City of Minneapolis Street to 48th Street) as standard high-pressure sodium (HPS) lighting comparison corridor #12;The over time #12;Initial Lighting Comparison #12;Lighting Project Location #12;Street Light Layout 30

Minnesota, University of

30

US Recovery Act Smart Grid Projects - Equipment Manufacturing | Open Energy  

Open Energy Info (EERE)

Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" title=\"Georgia System Operations Corporation Inc. Smart Grid Project\">Georgia System Operations Corporation Inc. Smart Grid Project","title":"Georgia System Operations Corporation Inc. Smart Grid Project","link":null,"lat":33.8545479,"lon":-84.2171424,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Grid_Project\" title=\"Whirlpool Corporation Smart Grid Project\">Whirlpool Corporation Smart Grid

31

Category:Smart Grid Projects - Energy Storage Demonstrations | Open Energy  

Open Energy Info (EERE)

Energy Storage Demonstrations Energy Storage Demonstrations Jump to: navigation, search Smart Grid Energy Storage Demonstration Projects category. Pages in category "Smart Grid Projects - Energy Storage Demonstrations" The following 16 pages are in this category, out of 16 total. 4 44 Tech Inc. Smart Grid Demonstration Project A Amber Kinetics, Inc. Smart Grid Demonstration Project B Beacon Power Corporation Smart Grid Demonstration Project C City of Painesville Smart Grid Demonstration Project D Duke Energy Business Services, LLC Smart Grid Demonstration Project E East Penn Manufacturing Co. Smart Grid Demonstration Project K Ktech Corporation Smart Grid Demonstration Project N New York State Electric & Gas Corporation Smart Grid Demonstration Project P Pacific Gas & Electric Company Smart Grid Demonstration Project

32

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

33

JEA Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

JEA Smart Grid Project JEA Smart Grid Project Jump to: navigation, search Project Lead JEA Country United States Headquarters Location Jacksonville, Florida Recovery Act Funding $13,031,547.00 Total Project Value $26,204,891.00 Coverage Area Coverage Map: JEA Smart Grid Project Coordinates 30.3321838°, -81.655651° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

34

Salt River Project Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Salt River Project Smart Grid Project Salt River Project Smart Grid Project Jump to: navigation, search Project Lead Salt River Project Country United States Headquarters Location Tempe, Arizona Recovery Act Funding $56,859,359.00 Total Project Value $114,003,719.00 Coverage Area Coverage Map: Salt River Project Smart Grid Project Coordinates 33.414768°, -111.9093095° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

35

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

36

Vineyard Energy Project Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Vineyard Energy Project Country United States Headquarters Location West Tisbury, Massachusetts Recovery Act Funding $787,250.00 Total Project Value $1,574,500.00 Coverage Area Coverage Map: Vineyard Energy Project Smart Grid Project Coordinates 41.3812245°, -70.6744723° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

37

MHK Projects/Portugal Pre Commercial Pilot Project | Open Energy  

Open Energy Info (EERE)

Portugal Pre Commercial Pilot Project Portugal Pre Commercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

38

Reports on Initial Results of Smart Grid Investment Grant Projects...  

Energy Savers [EERE]

2012) Reports on Initial Results of Smart Grid Investment Grant Projects (December 2012) DOE is implementing the Smart Grid Investment Grant (SGIG) program under the American...

39

H Foundation Pilot Project Awards  

E-Print Network [OSTI]

Center of Excellence (PCE) Release Date: June 5, 2013, PCE or rPPC) Through the generous support of the H Foundation, members of the Basic Sciences project awards will provide up to $5,000 directly to the Proteomics Center of Excellence (PCE

40

National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island (Fact Sheet)  

SciTech Connect (OSTI)

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a DER pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. 37 of these projects were comprehensive retrofits while 5 were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. The 42 DER projects represent 60 units of housing. The comprehensive projects all implemented a consistent "package" of measures in terms of the performance targeted for major building components. Projects exhibited some variations in the approach to implementing the retrofit package. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects. Post-retrofit energy use was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Homeowner surveys were returned by 12 of the pilot participants. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

Not Available

2014-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

JGI - The GEBA Pilot Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GEBA Sequencing Plans GEBA Sequencing Plans For status information, see the Genome Projects section, or go to Microbial Genomics to find the latest releases. Organism Domain Phylum Status IMG-ER NCBI PID Culture ID GOLD ID Acidimicrobium ferrooxidans DSM 10331 Bacteria Actinobacteria draft DSM 10331 Gi02326 Actinosynnema mirum 101, DSM 43827 Bacteria Actinobacteria draft 2500395345 19705 DSM 43827 Gi02064 Alicyclobacillus acidocaldarius acidocaldarius 104-IA, DSM 446 Bacteria Firmicutes draft 29405 DSM 446 Gi02324 Anaerococcus prevotii PC 1, DSM 20548 Bacteria Firmicutes draft DSM 20548 Gi02318 Atopobium parvulum IPP 1246, DSM 20469 Bacteria Actinobacteria draft 29401 DSM 20469 Gi02317 Beutenbergia cavernosa HKI 0122, DSM 12333 Bacteria Actinobacteria draft 2500395322 20827 DSM 12333 Gi02225

42

Stakeholder Engagement and Outreach: Wind for Schools Pilot Project Results  

Wind Powering America (EERE)

Pilot Project Results Pilot Project Results In 2006, the Wind Powering America team based at the National Renewable Energy Laboratory (NREL) launched a pilot project in Colorado to develop the Wind for Schools project model. The pilot project identified the key elements of a successful Wind for Schools project. This page summarizes these elements. Although the Wind for Schools project ended on September 30, 2013, these lessons learned can be helpful for others planning school turbine installations. Identify a Champion A project cannot succeed without a local project champion, an individual, or group to keep the key players in the community informed, cooperating, and moving toward project goals. During the Colorado pilot project, the Wind Powering America team learned that the project development stages of

43

Pecan Street Project, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Project, Inc. Smart Grid Demonstration Project Project, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Pecan Street Project, Inc. Country United States Headquarters Location Austin, Texas Recovery Act Funding $10,403,570.00 Total Project Value $24,656,485.00 Coordinates 30.267153°, -97.7430608° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

44

Smart Grid Week: New Project in Oregon Helping Advance the Grid of the  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Week: New Project in Oregon Helping Advance the Grid of Smart Grid Week: New Project in Oregon Helping Advance the Grid of the Future Smart Grid Week: New Project in Oregon Helping Advance the Grid of the Future June 7, 2013 - 2:07pm Addthis Rows of battery racks at Portland General Electric’s Salem Smart Power Center in Salem, Ore. PGE is a participant in the Battelle-led Pacific Northwest Smart Grid Demonstration Project, which will use the center’s 5-megawatt energy storage system to test several smart grid technologies and approaches. | Photo courtesy of Portland General Electric. Rows of battery racks at Portland General Electric's Salem Smart Power Center in Salem, Ore. PGE is a participant in the Battelle-led Pacific Northwest Smart Grid Demonstration Project, which will use the center's 5-megawatt energy storage system to test several smart grid technologies

45

EDISON (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

EDISON (Smart Grid Project) EDISON (Smart Grid Project) Jump to: navigation, search Project Name EDISON Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

46

AMIS (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

AMIS (Smart Grid Project) AMIS (Smart Grid Project) Jump to: navigation, search Project Name AMIS Country Austria Headquarters Location Steyr, Austria Coordinates 48.050091°, 14.41827° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.050091,"lon":14.41827,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

47

Fenix (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Fenix (Smart Grid Project) Fenix (Smart Grid Project) Jump to: navigation, search Project Name Fenix Country Spain Coordinates 40.287907°, -3.988037° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.287907,"lon":-3.988037,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

48

EVCOM (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

EVCOM (Smart Grid Project) EVCOM (Smart Grid Project) Jump to: navigation, search Project Name EVCOM Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

49

ENERGOZ (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

ENERGOZ (Smart Grid Project) ENERGOZ (Smart Grid Project) Jump to: navigation, search Project Name ENERGOZ Country Slovakia Headquarters Location Bratislava, Slovakia Coordinates 48.148376°, 17.107309° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.148376,"lon":17.107309,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

50

GAD (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

GAD (Smart Grid Project) GAD (Smart Grid Project) Jump to: navigation, search Project Name GAD Country Spain Coordinates 39.943436°, -4.229736° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.943436,"lon":-4.229736,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

51

Eprice (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Eprice (Smart Grid Project) Eprice (Smart Grid Project) Jump to: navigation, search Project Name Eprice Country Netherlands Coordinates 52.132633°, 5.291266° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.132633,"lon":5.291266,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

52

Almacena (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Almacena (Smart Grid Project) Almacena (Smart Grid Project) Jump to: navigation, search Project Name Almacena Country Spain Headquarters Location Carmona, Spain Coordinates 37.317753°, -5.625° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.317753,"lon":-5.625,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

53

EFlex (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

EFlex (Smart Grid Project) EFlex (Smart Grid Project) Jump to: navigation, search Project Name eFlex Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

54

Etelligence (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Etelligence (Smart Grid Project) Etelligence (Smart Grid Project) Jump to: navigation, search Project Name Etelligence Country Germany Headquarters Location Oldenburg, Germany Coordinates 53.136719°, 8.216536° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.136719,"lon":8.216536,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

55

ADELE Project AACAES (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

ADELE Project AACAES (Smart Grid Project) ADELE Project AACAES (Smart Grid Project) Jump to: navigation, search Project Name ADELE Project AACAES Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

56

Demonstration project Smart Charging (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

project Smart Charging (Smart Grid Project) project Smart Charging (Smart Grid Project) Jump to: navigation, search Project Name Demonstration project Smart Charging Country Netherlands Headquarters Location Noord-Brabant, Netherlands Coordinates 51.482655°, 5.232169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.482655,"lon":5.232169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

57

DataHub project (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DataHub project (Smart Grid Project) DataHub project (Smart Grid Project) Jump to: navigation, search Project Name DataHub project Country Denmark Headquarters Location Fredericia, Denmark Coordinates 55.570332°, 9.746595° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.570332,"lon":9.746595,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

58

ESB Smart Meter Projects (Smart Grid Project) (Limerick, Ireland) | Open  

Open Energy Info (EERE)

Projects (Smart Grid Project) (Limerick, Ireland) Projects (Smart Grid Project) (Limerick, Ireland) Jump to: navigation, search Project Name ESB Smart Meter Projects Country Ireland Headquarters Location Limerick, Ireland Coordinates 52.663857°, -8.626773° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.663857,"lon":-8.626773,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

59

DSOpilot project (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DSOpilot project (Smart Grid Project) DSOpilot project (Smart Grid Project) Jump to: navigation, search Project Name DSOpilot project Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

60

US/Brazil joint pilot project objectives  

SciTech Connect (OSTI)

This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, where much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.

NONE

1997-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

MHK Projects/CETO Precommercial Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Precommercial Pilot Project Precommercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-32.2509,"lon":115.651,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

62

EWIS European wind integration study (Smart Grid Project) (Germany...  

Open Energy Info (EERE)

EWIS European wind integration study (Smart Grid Project) (Germany) Jump to: navigation, search Project Name EWIS European wind integration study Country Germany Coordinates...

63

EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) (Salzburg...  

Open Energy Info (EERE)

References EU Smart Grid Projects Map1 Overview The emporA projects bring together automobile industry, infrastructure technology, and energy supply sectors in order to achieve a...

64

EWIS European wind integration study (Smart Grid Project) (Netherlands...  

Open Energy Info (EERE)

EWIS European wind integration study (Smart Grid Project) (Netherlands) Jump to: navigation, search Project Name EWIS European wind integration study Country Netherlands...

65

EEnergy Project "MeRegio" (Smart Grid Project) (Baden-Wrttemberg...  

Open Energy Info (EERE)

EEnergy Project "MeRegio" (Smart Grid Project) (Baden-Wrttemberg, Germany) Jump to: navigation, search Project Name EEnergy Project "MeRegio" Country Germany Headquarters...

66

Renewable Energy in China: Xiao Qing Dao Village Power Wind/Diesel Hybrid Pilot Project  

SciTech Connect (OSTI)

In 2000, DOE/NREL and the State Power Corporation of China (SPCC) developed a pilot project to electrify Xiao Qing Dao, a small island located in China's Yellow Sea. The project demonstrates the practicality of renewable energy systems for medium-scale, off-grid applications. It consists of four 10 k-W wind turbines connected to a 30-kW diesel generator, a 40-kW inverter and a battery bank.

Not Available

2006-01-01T23:59:59.000Z

67

Texas Propane Vehicle Pilot Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt058tikelly2011p.pdf More Documents & Publications Texas Propane Vehicle Pilot Project Texas...

68

US Virgin Islands EDIN Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Islands EDIN Pilot Project Islands EDIN Pilot Project Jump to: navigation, search Logo: EDIN US Virgin Islands Pilot Project Name EDIN US Virgin Islands Pilot Project Agency/Company /Organization National Renewable Energy Laboratory, United States Department of Energy Partner EDIN Initiative Partners Sector Energy Focus Area Energy Efficiency Topics Low emission development planning, Background analysis Website http://www.edinenergy.org/usvi Country United States Northern America References National Renewable Energy Laboratory, EERE Supported International Activities FY 2009 Annual Operating Plan (August 25, 2009 Abstract The purpose of the EDIN pilot is to have a meaningful impact in a short duration by developing clean energy technologies, policies, and financing mechanisms for the pilot island with projects whose elements can be repeated on other islands.

69

EIS-0207: Newberry Geothermal Pilot Project  

Broader source: Energy.gov [DOE]

The U.S. Forest Service prepared this statement to analyze three alternatives and associated environmental impacts for it to enable the CEE Exploration Company of Portland, Oregon to build and operate a geothermal pilot project and supporting facilities capable of generating 33 megawatts of electric power in the Deschutes National Forest in central Oregon. The Department of Energys Bonneville Power Administration (BPA) served as a cooperating agency in preparing this statement in order to fulfill its National Environmental Policy Act obligations ahead of its statutory obligations to purchase and transmit power to customers in the Pacific Northwest, if it is decided that the project will proceed. BPA adopted this statement by October 1994.

70

East Penn Manufacturing Co. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Manufacturing Co. Smart Grid Demonstration Project Manufacturing Co. Smart Grid Demonstration Project Jump to: navigation, search Project Lead East Penn Manufacturing Co. Country United States Headquarters Location Lyon Station, Pennsylvania Recovery Act Funding $2,245,523.00 Total Project Value $4,491,046.00 References ARRA Smart Grid Demonstration Projects[1] This article is a stub. You can help OpenEI by expanding it. The East Penn Manufacturing Co. Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in Lyon Station, Pennsylvania. Overview Demonstrate the economic and technical viability of a 3MW grid-scale, advanced energy storage system using the lead-carbon UltraBattery technology to regulate frequency and manage energy demand. This project

71

Pacific Northwest Smart GridPacific Northwest Smart Grid Demonstration ProjectDemonstration Project  

E-Print Network [OSTI]

Northwest Power and Conservation Council Lee Hall, BPA Smart Grid Program Manager Tracy Yount, Battelle ­ 16% less than the normal peak demand ­ Real capital cost savings when a $10M substation can transmission ­ BPA, PacifiCorp, Idaho Power represent region 9 This project is a cornerstone of the Pacific

72

West Virginia Smart Grid Implementation Plan (WV SGIP) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

West Virginia Smart Grid Implementation Plan (WV SGIP) Project West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Assessment of As-Is Grid by Non-Utility Stakeholders Introduction One goal of this grid modernization project is to assess the current status of the electric power grid in West Virginia in order to define the potential to implement smart grid technologies. Thus, an initial task of this project was to define the current state or "As-Is" grid in West Virginia. Financial and time constraints prohibited the development and execution of formal surveys to solicit input from the various stakeholders. However attempts were made to obtain their input through informal questionnaires and meeting with focus groups. list of stakeholders which

73

Smart Grid Week: New Project in Oregon Helping Advance the Grid...  

Energy Savers [EERE]

Project, which will use the centers 5-megawatt energy storage system to test several smart grid technologies and approaches. | Photo courtesy of Portland General...

74

New York Completes Smart Grid Project to Build a More Reliable, Resilient Power Grid  

Broader source: Energy.gov [DOE]

The Energy Department recognized the completion of New York Independent System Operators smart grid and control center project in Rensselaer, New York.

75

South Mississippi Electric Power Association Smart Grid Project (Mississippi)  

Broader source: Energy.gov [DOE]

South Mississippi Electric Power Associations (SMEPA) smart grid project involves the deployment of advanced metering infrastructure (AMI) and covers the Generation and Transmission (G&T)...

76

First Commercial, Grid-Connected, Hydrokinetic Tidal Energy Project...  

Office of Science (SC) Website

First Commercial, Grid-Connected, Hydrokinetic Tidal Energy Project in North America Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR...

77

Perspectives in Practice A Garden Pilot Project Enhances Fruit and  

E-Print Network [OSTI]

RESEARCH Perspectives in Practice A Garden Pilot Project Enhances Fruit and Vegetable Consumption among Children STEPHANIE HEIM, MPH, RD; JAMIE STANG, PhD, MPH, RD; MARJORIE IRELAND, PhD ABSTRACT Fruit a strategy for increasing fruit and vegetable intake in chil- dren. A 12-week pilot intervention was designed

Maxwell, Bruce D.

78

Reports on Initial Results of Smart Grid Investment Grant Projects  

Broader source: Energy.gov (indexed) [DOE]

Reports on Initial Results of Smart Grid Investment Grant Projects Reports on Initial Results of Smart Grid Investment Grant Projects (December 2012) Reports on Initial Results of Smart Grid Investment Grant Projects (December 2012) DOE is implementing the Smart Grid Investment Grant (SGIG) program under the American Recovery and Reinvestment Act of 2009. The SGIG program involves 99 projects that are deploying smart grid technologies, tools, and techniques for electric transmission, distribution, advanced metering, and customer systems. These reports present information about the devices and systems being implemented, deployment progress, expected benefits, and initial results for projects improving electric distribution system reliability; implementing advanced metering, customer systems, and time-based rates; adding advanced voltage and volt-ampere reactive (VAR) optimization (VVO)

79

Texas Offshore Pilot Research Project | Open Energy Information  

Open Energy Info (EERE)

Texas Offshore Pilot Research Project Texas Offshore Pilot Research Project Jump to: navigation, search Name Texas Offshore Pilot Research Project Facility Texas Offshore Pilot Research Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Gulf of Mexico TX Coordinates 26.186°, -97.077° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.186,"lon":-97.077,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

80

Michigan Offshore Wind Pilot Project | Open Energy Information  

Open Energy Info (EERE)

Offshore Wind Pilot Project Offshore Wind Pilot Project Jump to: navigation, search Name Michigan Offshore Wind Pilot Project Facility Michigan Offshore Wind Pilot Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Mighigan Alternative and Renewable Energy Center Developer Mighigan Alternative and Renewable Energy Center Location Muskegon Lake MI Coordinates 43.231°, -86.307° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.231,"lon":-86.307,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Harvard Catalyst Pilot Grants Projects Funded for Year Three  

E-Print Network [OSTI]

Harvard Catalyst Pilot Grants Projects Funded for Year Three Experimental Approach to Genotype the Harvard Catalyst Program we aim to:1) Review, select and culturally adapt evidence-based modules from

Paulsson, Johan

82

EA-1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii |  

Broader source: Energy.gov (indexed) [DOE]

1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii 1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii EA-1829: Phycal Algae Pilot Project, Wahiawa and Kalaeloa, Hawaii Summary This EA evaluates the environmental impacts of a proposal, through a cooperative agreement with Phycal, Inc. to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost information and test data to access its viability for implementation at a future commercial scale. If approved, DOE would provide approximately 80 percent of the funding for the project. Public Comment Opportunities

83

Flywheel Project Escalates Grid Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Flywheel Project Escalates Grid Efficiency Flywheel Project Escalates Grid Efficiency Flywheel Project Escalates Grid Efficiency August 9, 2010 - 1:18pm Addthis Elizabeth Meckes Elizabeth Meckes Director of User Experience & Digital Technologies, Office of Public Affairs What does this project do? It's estimated to create 60 jobs in New York and Massachusetts (where Beacon Power is headquartered) and help bring clean technologies to market by improving the stability and reliability of the state's electric grid. More good news for New York State: in addition to last week's announcement on the AES energy storage project, the Energy Department has finalized a $43 million loan guarantee for Beacon Power Corporation's flywheel energy storage plant. Not only is the project estimated to create 60 jobs in New York and Massachusetts (where Beacon Power is

84

Distribution System planning for Smart Grids, ForskEL (Smart Grid Project)  

Open Energy Info (EERE)

planning for Smart Grids, ForskEL (Smart Grid Project) planning for Smart Grids, ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Distribution System planning for Smart Grids, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

85

DG Demonet Smart LV Grid (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Demonet Smart LV Grid (Smart Grid Project) Demonet Smart LV Grid (Smart Grid Project) Jump to: navigation, search Project Name DG Demonet Smart LV Grid Country Austria Coordinates 47.516232°, 14.550072° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.516232,"lon":14.550072,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

86

Building to Grid (B2G) (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

to Grid (B2G) (Smart Grid Project) to Grid (B2G) (Smart Grid Project) Jump to: navigation, search Project Name Building to Grid (B2G) Country Austria Headquarters Location Salzburg, Austria Coordinates 47.80949°, 13.05501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.80949,"lon":13.05501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

87

Electrical vehicles impacts on the grids (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

vehicles impacts on the grids (Smart Grid Project) vehicles impacts on the grids (Smart Grid Project) Jump to: navigation, search Project Name Electrical vehicles impacts on the grids Country Belgium Coordinates 50.471493°, 3.988037° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.471493,"lon":3.988037,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

88

Consumer to Grid (C2G) (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Consumer to Grid (C2G) (Smart Grid Project) Consumer to Grid (C2G) (Smart Grid Project) Jump to: navigation, search Project Name Consumer to Grid (C2G) Country Austria Headquarters Location Salzburg, Austria Coordinates 47.80949°, 13.05501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.80949,"lon":13.05501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

89

NETL: Ion Advanced Solvent CO2 Capture Pilot Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ion Advanced Solvent CO2 Capture Pilot Project Ion Advanced Solvent CO2 Capture Pilot Project Project No.: DE-FE0013303 ION Engineering is conducting small pilot-scale (~ 0.7 MW) testing of an advanced CO2 capture solvent technology that has previously undergone bench-scale testing. The small pilot-scale testing will involve continuous long-term operation in order to gather the necessary data ultimately required for further scale-up. Activities will include the design and fabrication of the 0.5-0.7 MWe (equivalent) slipstream pilot plant; scale-up of solvent manufacturing; testing, data collection, and analysis of solvent performance; degradation and air emission analysis; modeling and simulation for the detailed preliminary and final techno-economic analyses; and decommissioning of pilot plant equipment upon completion of solvent testing. The advanced solvent is anticipated to have significant operating and capital cost advantages over other solvents currently in development. Advantages include significant reductions in parasitic load and liquid flow rates which directly translate to smaller more efficient CO2 capture processes. Make-up water and amine emissions rates will be examined during this project. There is the potential that additional solvent, system, and integration savings will be identified, which could result in further operating and capital cost reductions.

90

Regional Drinking Water Security District Level Pilot Project  

E-Print Network [OSTI]

Regional Drinking Water Security District Level Pilot Project Concept Note Milind Sohoni Head that most habitations of several talukas will face drinking water stress for much of the coming year. The central objective of the project will be to ensure regional drinking water security for a district

Sohoni, Milind

91

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network [OSTI]

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

92

Pacific Northwest Smart Grid Demonstration Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies BPA has joined 11 utilities, a major...

93

Smart Grid Week: R&D Projects Paving the Way to the 21st Century Grid |  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Week: R&D Projects Paving the Way to the 21st Century Smart Grid Week: R&D Projects Paving the Way to the 21st Century Grid Smart Grid Week: R&D Projects Paving the Way to the 21st Century Grid June 4, 2013 - 10:50am Q&A What do you want to know about the smart grid? We'll be answering your questions in a follow-up piece. Ask Us Addthis Pacific Northwest National Laboratory's GridLAB-D™ tool works to simulate all aspects of the energy grid from generation to end use allowing users to see the future of the grid like never before. | Photo courtesy of Pacific Northwest National Laboratory. Pacific Northwest National Laboratory's GridLAB-D(tm) tool works to simulate all aspects of the energy grid from generation to end use allowing users to

94

Smart Grid Week: R&D Projects Paving the Way to the 21st Century Grid |  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Week: R&D Projects Paving the Way to the 21st Century Smart Grid Week: R&D Projects Paving the Way to the 21st Century Grid Smart Grid Week: R&D Projects Paving the Way to the 21st Century Grid June 4, 2013 - 10:50am Q&A What do you want to know about the smart grid? We'll be answering your questions in a follow-up piece. Ask Us Addthis Pacific Northwest National Laboratory's GridLAB-D™ tool works to simulate all aspects of the energy grid from generation to end use allowing users to see the future of the grid like never before. | Photo courtesy of Pacific Northwest National Laboratory. Pacific Northwest National Laboratory's GridLAB-D(tm) tool works to simulate all aspects of the energy grid from generation to end use allowing users to

95

Sacramento Municipal Utility District PV and Smart Grid Pilot at Anatolia  

SciTech Connect (OSTI)

Under DE-FOA-0000085 High Penetration Solar Deployment, the U. S. Department of Energy funded agreements with SMUD and Navigant Consulting, SunPower, GridPoint, the National Renewable Energy Laboratory, and the California Energy Commission for this pilot demonstration project. Funding was $5,962,409.00. Cost share of $500,000 was also provided by the California Energy Commission. The project has strategic implications for SMUD, other utilities and the PV and energy-storage industries in business and resource planning, technology deployment and asset management. These implications include: -At this point, no dominant business models have emerged and the industry is open for new ideas. -Demonstrated two business models for using distributed PV and energy storage, and brainstormed several dozen more, each with different pros and cons for SMUD, its customers and the industry. -Energy storage can be used to manage high penetrations of PV and mitigate potential issues such as reverse power flow, voltage control violations, power quality issues, increased wear and tear on utility equipment, and system wide power supply issues. - Smart meters are another tool utilities can use to manage high penetrations of PV. The necessary equipment and protocols exist, and the next step is to determine how to integrate the functionality with utility programs and what level of utility control is required. - Time-of-use rates for the residential customers who hosted energy storage systems did not cause a significant change in energy usage patterns. However, the rates we used were not optimized for PV and energy storage. Opportunities exist for utilities to develop new structures.

Rawson, Mark; Sanchez, Eddie Paul

2013-12-30T23:59:59.000Z

96

NV Energy, Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

NV Energy, Inc. Smart Grid Project NV Energy, Inc. Smart Grid Project Jump to: navigation, search Project Lead NV Energy, Inc. Country United States Headquarters Location Las Vegas, Nevada Recovery Act Funding $$137,877,906 Total Project Value $$275,755,812 Coverage Area Coverage Map: NV Energy, Inc. Smart Grid Project Coordinates 36.114646°, -115.172816° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

97

Atlantic City Electric Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Atlantic City Electric Company Country United States Headquarters Location Mays Landing, New Jersey Additional Benefit Places Maryland, District of Columbia Recovery Act Funding $18,700,000.00 Total Project Value $37,400,000.00 Coverage Area Coverage Map: Atlantic City Electric Company Smart Grid Project Coordinates 39.4523385°, -74.7276626° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

98

NSTAR Electric Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Company Smart Grid Project Company Smart Grid Project Jump to: navigation, search Project Lead NSTAR Electric Company Country United States Headquarters Location Norfolk, Massachusetts Recovery Act Funding $10,061,883.00 Total Project Value $20,123,766.00 Coverage Area Coverage Map: NSTAR Electric Company Smart Grid Project Coordinates 42.1195426°, -71.3250563° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

99

Intellon Corporation Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Intellon Corporation Smart Grid Project Intellon Corporation Smart Grid Project Jump to: navigation, search Project Lead Intellon Corporation Country United States Headquarters Location Orlando, Florida Recovery Act Funding $4,955,583.00 Total Project Value $9,911,166.00 Coverage Area Coverage Map: Intellon Corporation Smart Grid Project Coordinates 28.5383355°, -81.3792365° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

100

City of Auburn, IN Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead City of Auburn, IN Country United States Headquarters Location Auburn, Indiana Recovery Act Funding $2,075,080.00 Total Project Value $4,150,160.00 Coverage Area Coverage Map: City of Auburn, IN Smart Grid Project Coordinates 41.3669942°, -85.0588575° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

102

Connecticut Municipal Electric Energy Cooperative Smart Grid Project | Open  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Connecticut Municipal Electric Energy Cooperative Country United States Headquarters Location Norwich, Connecticut Recovery Act Funding $9,188,050.00 Total Project Value $18,376,100.00 Coverage Area Coverage Map: Connecticut Municipal Electric Energy Cooperative Smart Grid Project Coordinates 41.5242649°, -72.0759105° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

103

PPL Electric Utilities Corp. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Corp. Smart Grid Project Corp. Smart Grid Project Jump to: navigation, search Project Lead PPL Electric Utilities Corp. Country United States Headquarters Location Allentown, Pennsylvania Recovery Act Funding $19,054,516.00 Total Project Value $38,109,032.00 Coverage Area Coverage Map: PPL Electric Utilities Corp. Smart Grid Project Coordinates 40.6084305°, -75.4901833° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

104

Sioux Valley Southwestern Electric Cooperative, Inc. Smart Grid Project |  

Open Energy Info (EERE)

Sioux Valley Southwestern Electric Cooperative, Inc. Smart Grid Project Sioux Valley Southwestern Electric Cooperative, Inc. Smart Grid Project Jump to: navigation, search Project Lead Sioux Valley Southwestern Electric Cooperative, Inc. Country United States Headquarters Location Colman, South Dakota Additional Benefit Places Minnesota Recovery Act Funding $4,016,368.00 Total Project Value $8,032,736.00 Coverage Area Coverage Map: Sioux Valley Southwestern Electric Cooperative, Inc. Smart Grid Project Coordinates 43.9824719°, -96.8144973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

105

Northern Virginia Electric Cooperative Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Cooperative Smart Grid Project Cooperative Smart Grid Project Jump to: navigation, search Project Lead Northern Virginia Electric Cooperative Country United States Headquarters Location Manassas, Virginia Recovery Act Funding $5,000,000.00 Total Project Value $10,000,000.00 Coverage Area Coverage Map: Northern Virginia Electric Cooperative Smart Grid Project Coordinates 38.7509488°, -77.4752667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

106

Potomac Electric Power Company (PEPCO) Smart Grid Project (Maryland) | Open  

Open Energy Info (EERE)

Smart Grid Project (Maryland) Smart Grid Project (Maryland) Jump to: navigation, search Project Lead Potomac Electric Power Company (PEPCO) Country United States Headquarters Location Washington, District of Columbia Recovery Act Funding $104780549 Total Project Value $209561098 Coverage Area Coverage Map: Potomac Electric Power Company (PEPCO) Smart Grid Project (Maryland) Coordinates 38.8951118°, -77.0363658° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

107

PECO Energy Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

PECO Energy Company Smart Grid Project PECO Energy Company Smart Grid Project Jump to: navigation, search Project Lead PECO Energy Company Country United States Headquarters Location Philadelphia, Pennsylvania Recovery Act Funding $200,000,000.00 Total Project Value $415118677 Coverage Area Coverage Map: PECO Energy Company Smart Grid Project Coordinates 39.952335°, -75.163789° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

108

City of Wadsworth, OH Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

OH Smart Grid Project OH Smart Grid Project Jump to: navigation, search Project Lead City of Wadsworth, OH Country United States Headquarters Location Wadsworth, Ohio Recovery Act Funding $5,411,769.00 Total Project Value $10,823,539.00 Coverage Area Coverage Map: City of Wadsworth, OH Smart Grid Project Coordinates 41.0256101°, -81.7298519° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

109

Knoxville Utilities Board Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Board Smart Grid Project Board Smart Grid Project Jump to: navigation, search Project Lead Knoxville Utilities Board Country United States Headquarters Location Knoxville, Tennessee Recovery Act Funding $3,585,022.00 Total Project Value $9356989 Coverage Area Coverage Map: Knoxville Utilities Board Smart Grid Project Coordinates 35.9606384°, -83.9207392° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

110

Western Electricity Coordinating Council Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Council Smart Grid Project Council Smart Grid Project Jump to: navigation, search Project Lead Western Electricity Coordinating Council Country United States Headquarters Location Salt Lake City, Utah Additional Benefit Places Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, South Dakota, Texas, Washington Recovery Act Funding $53,890,000.00 Total Project Value $107,780,000.00 Coverage Area Coverage Map: Western Electricity Coordinating Council Smart Grid Project Coordinates 40.7607793°, -111.8910474° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

111

New Hampshire Electric Cooperative Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Hampshire Electric Cooperative Smart Grid Project Hampshire Electric Cooperative Smart Grid Project Jump to: navigation, search Project Lead New Hampshire Electric Cooperative Country United States Headquarters Location Plymouth, New Hampshire Recovery Act Funding $15,815,225.00 Total Project Value $35,144,946.00 Coverage Area Coverage Map: New Hampshire Electric Cooperative Smart Grid Project Coordinates 43.7570166°, -71.6881337° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

112

Black Hills Power, Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Black Hills Power, Inc. Smart Grid Project Black Hills Power, Inc. Smart Grid Project Jump to: navigation, search Project Lead Black Hills Power, Inc. Country United States Headquarters Location Rapid City, South Dakota Additional Benefit Places North Dakota, Minnesota Recovery Act Funding $9.576,628 Total Project Value $19,153,256 Coverage Area Coverage Map: Black Hills Power, Inc. Smart Grid Project Coordinates 44.0805434°, -103.2310149° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

113

Vermont Transco, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Transco, LLC Smart Grid Project Transco, LLC Smart Grid Project Jump to: navigation, search Project Lead Vermont Transco, LLC Country United States Headquarters Location Rutland, Vermont Recovery Act Funding $68,928,650.00 Total Project Value $137,857,302.00 Coverage Area Coverage Map: Vermont Transco, LLC Smart Grid Project Coordinates 43.6106237°, -72.9726065° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

114

Marblehead Municipal Light Department Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Marblehead Municipal Light Department Smart Grid Project Marblehead Municipal Light Department Smart Grid Project Jump to: navigation, search Project Lead Marblehead Municipal Light Department Country United States Headquarters Location Marblehead, Massachusetts Recovery Act Funding $1,346,175.00 Total Project Value $2,692,350.00 Coverage Area Coverage Map: Marblehead Municipal Light Department Smart Grid Project Coordinates 42.500096°, -70.8578253° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

115

Tri State Electric Membership Corporation Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Electric Membership Corporation Smart Grid Project Electric Membership Corporation Smart Grid Project Jump to: navigation, search Project Lead Tri State Electric Membership Corporation Country United States Headquarters Location McCaysville, Georgia Additional Benefit Places Tennessee Recovery Act Funding $1,138,060.00 Total Project Value $2,421,405.00 Coverage Area Coverage Map: Tri State Electric Membership Corporation Smart Grid Project Coordinates 34.9861914°, -84.3713117° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

116

Lafayette Consolidated Government, LA Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Lafayette Consolidated Government, LA Smart Grid Project Lafayette Consolidated Government, LA Smart Grid Project Jump to: navigation, search Project Lead Lafayette Consolidated Government, LA Country United States Headquarters Location Lafayette, Louisiana Recovery Act Funding $11,630,000.00 Total Project Value $23,260,000.00 Coverage Area Coverage Map: Lafayette Consolidated Government, LA Smart Grid Project Coordinates 30.2240897°, -92.0198427° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

117

South Mississippi Electric Power Association (SMEPA) Smart Grid Project |  

Open Energy Info (EERE)

Association (SMEPA) Smart Grid Project Association (SMEPA) Smart Grid Project Jump to: navigation, search Project Lead South Mississippi Electric Power Association (SMEPA) Country United States Headquarters Location Hattiesburg, Mississippi Recovery Act Funding $30,563,967.00 Total Project Value $61,127,935.00 Coverage Area Coverage Map: South Mississippi Electric Power Association (SMEPA) Smart Grid Project Coordinates 31.3271189°, -89.2903392° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

118

South Kentucky Rural Electric Cooperative Corporation Smart Grid Project |  

Open Energy Info (EERE)

Corporation Smart Grid Project Corporation Smart Grid Project Jump to: navigation, search Project Lead South Kentucky Rural Electric Cooperative Corporation Country United States Headquarters Location Somerset, Kentucky Recovery Act Funding $9538234 Total Project Value $19636295 Coverage Area Coverage Map: South Kentucky Rural Electric Cooperative Corporation Smart Grid Project Coordinates 37.0920222°, -84.6041084° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

119

City of Anaheim Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Anaheim Smart Grid Project Anaheim Smart Grid Project Jump to: navigation, search Project Lead City of Anaheim Country United States Headquarters Location Anaheim, California Recovery Act Funding $5,896,025.00 Total Project Value $12,167,050.00 Coverage Area Coverage Map: City of Anaheim Smart Grid Project Coordinates 33.8352932°, -117.9145036° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

120

City of Tallahassee Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Tallahassee Smart Grid Project Tallahassee Smart Grid Project Jump to: navigation, search Project Lead City of Tallahassee Country United States Headquarters Location Tallahassee, Florida Recovery Act Funding $8890554 Total Project Value $19869787 Coverage Area Coverage Map: City of Tallahassee Smart Grid Project Coordinates 30.4382559°, -84.2807329° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Town of Danvers, MA Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Town of Danvers, MA Country United States Headquarters Location Danvers, Massachusetts Recovery Act Funding $8,476,800.00 Total Project Value $16,953,600.00 Coverage Area Coverage Map: Town of Danvers, MA Smart Grid Project Coordinates 42.5750946°, -70.9300507° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

122

M2M Communications Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Communications Smart Grid Project Communications Smart Grid Project Jump to: navigation, search Project Lead M2M Communications Country United States Headquarters Location Boise, Idaho Recovery Act Funding $2,171,710.00 Total Project Value $4,343,421.00 Coverage Area Coverage Map: M2M Communications Smart Grid Project Coordinates 43.6135002°, -116.2034505° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

123

Lakeland Electric Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Lakeland Electric Smart Grid Project Lakeland Electric Smart Grid Project Jump to: navigation, search Project Lead Lakeland Electric Country United States Headquarters Location Lakeland, Florida Recovery Act Funding $14850000 Total Project Value $35078152 Coverage Area Coverage Map: Lakeland Electric Smart Grid Project Coordinates 28.0394654°, -81.9498042° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

124

Entergy Services, Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Services, Inc. Smart Grid Project Services, Inc. Smart Grid Project Jump to: navigation, search Project Lead Entergy Services, Inc. Country United States Headquarters Location New Orleans, Louisiana Recovery Act Funding $4,611,201.00 Total Project Value $9,222,402.00 Coverage Area Coverage Map: Entergy Services, Inc. Smart Grid Project Coordinates 29.9546482°, -90.075072° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

125

City of Westerville, OH Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Westerville, OH Smart Grid Project Westerville, OH Smart Grid Project Jump to: navigation, search Project Lead City of Westerville, OH Country United States Headquarters Location Westerville, Ohio Recovery Act Funding $4,320,000.00 Total Project Value $10,663,000.00 Coverage Area Coverage Map: City of Westerville, OH Smart Grid Project Coordinates 40.1261743°, -82.9290696° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

126

Snohomish County Public Utilities District Smart Grid Project | Open Energy  

Open Energy Info (EERE)

District Smart Grid Project District Smart Grid Project Jump to: navigation, search Project Lead Snohomish County Public Utilities District Country United States Headquarters Location Everett, Washington Recovery Act Funding $15,825,817.00 Total Project Value $31,651,634.00 Coverage Area Coverage Map: Snohomish County Public Utilities District Smart Grid Project Coordinates 47.9789848°, -122.2020794° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

127

Southwest Transmission Cooperative, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Inc. Smart Grid Project Inc. Smart Grid Project Jump to: navigation, search Project Lead Southwest Transmission Cooperative, Inc. Country United States Headquarters Location Benson, Arizona Recovery Act Funding $32,244,485.00 Total Project Value $64,488,970.00 Coverage Area Coverage Map: Southwest Transmission Cooperative, Inc. Smart Grid Project Coordinates 31.9678611°, -110.2945174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

128

Georgia System Operations Corporation Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Corporation Inc. Smart Grid Project Corporation Inc. Smart Grid Project Jump to: navigation, search Project Lead Georgia System Operations Corporation Inc. Country United States Headquarters Location Tucker, Georgia Recovery Act Funding $6,456,501.00 Total Project Value $12,913,003.00 Coverage Area Coverage Map: Georgia System Operations Corporation Inc. Smart Grid Project Coordinates 33.8545479°, -84.2171424° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

129

Hawaii Electric Co. Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Electric Co. Inc. Smart Grid Project Electric Co. Inc. Smart Grid Project Jump to: navigation, search Project Lead Hawaii Electric Co. Inc. Country United States Headquarters Location Oahu, Hawaii Recovery Act Funding $5,347,598.00 Total Project Value $10,695,195.00 Coverage Area Coverage Map: Hawaii Electric Co. Inc. Smart Grid Project Coordinates 21.4389123°, -158.0000565° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

130

Navajo Tribal Utility Association Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Navajo Tribal Utility Association Smart Grid Project Navajo Tribal Utility Association Smart Grid Project Jump to: navigation, search Project Lead Navajo Tribal Utility Association Country United States Headquarters Location Ft. Defiance, Arizona Additional Benefit Places New Mexico, Utah Recovery Act Funding $4991750 Total Project Value $10611849 Coverage Area Coverage Map: Navajo Tribal Utility Association Smart Grid Project Coordinates 35.7444602°, -109.0764828° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

131

Oklahoma Gas and Electric Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

and Electric Company Smart Grid Project and Electric Company Smart Grid Project Jump to: navigation, search Project Lead Oklahoma Gas and Electric Company Country United States Headquarters Location Oklahoma City, Oklahoma Additional Benefit Places Arkansas Recovery Act Funding $130,000,000.00 Total Project Value $357376037 Coverage Area Coverage Map: Oklahoma Gas and Electric Company Smart Grid Project Coordinates 35.4675602°, -97.5164276° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

132

Electric Power Board of Chattanooga Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Chattanooga Smart Grid Project Chattanooga Smart Grid Project Jump to: navigation, search Project Lead Electric Power Board of Chattanooga Country United States Headquarters Location Chattanooga, Tennessee Additional Benefit Places Georgia Recovery Act Funding $111,567,606.00 Total Project Value $226,707,562.00 Coverage Area Coverage Map: Electric Power Board of Chattanooga Smart Grid Project Coordinates 35.0456297°, -85.3096801° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

133

Modesto Irrigation District Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

District Smart Grid Project District Smart Grid Project Jump to: navigation, search Project Lead Modesto Irrigation District Recovery Act Funding $1,493,149.00 Total Project Value $2,986,298.00 Coverage Area Coverage Map: Modesto Irrigation District Smart Grid Project Coordinates 37.6390972°, -120.9968782° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

134

Central Maine Power Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Maine Power Company Smart Grid Project Maine Power Company Smart Grid Project Jump to: navigation, search Project Lead Central Maine Power Company Country United States Headquarters Location Augusta, Maine Recovery Act Funding $95858307 Total Project Value $191716614 Coverage Area Coverage Map: Central Maine Power Company Smart Grid Project Coordinates 44.3106241°, -69.7794897° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

135

Entergy New Orleans, Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Entergy New Orleans, Inc. Smart Grid Project Entergy New Orleans, Inc. Smart Grid Project Jump to: navigation, search Project Lead Entergy New Orleans, Inc. Country United States Headquarters Location New Orleans, Louisiana Recovery Act Funding $4996968 Total Project Value $10306668 Coverage Area Coverage Map: Entergy New Orleans, Inc. Smart Grid Project Coordinates 29.9546482°, -90.075072° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

136

Iowa Association of Municipal Utilities Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Iowa Association of Municipal Utilities Country United States Headquarters Location Ankeny, Iowa Recovery Act Funding $5,000,000.00 Total Project Value $12,531,203.00 Coverage Area Coverage Map: Iowa Association of Municipal Utilities Smart Grid Project Coordinates 41.726377°, -93.6052178° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

137

Honeywell International, Inc Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Inc Smart Grid Project Inc Smart Grid Project Jump to: navigation, search Project Lead Honeywell International, Inc Country United States Headquarters Location Danvers, Massachusetts Recovery Act Funding $11,384,363.00 Total Project Value $22,768,726.00 Coverage Area Coverage Map: Honeywell International, Inc Smart Grid Project Coordinates 42.5750946°, -70.9300507° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

138

Municipal Electric Authority of Georgia Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Georgia Smart Grid Project Georgia Smart Grid Project Jump to: navigation, search Project Lead Municipal Electric Authority of Georgia Country United States Headquarters Location Atlanta, Georgia Recovery Act Funding $12,267,350.00 Total Project Value $24,534,700.00 Coverage Area Coverage Map: Municipal Electric Authority of Georgia Smart Grid Project Coordinates 33.7489954°, -84.3879824° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

139

Midwest Independent Transmission System Operator Smart Grid Project | Open  

Open Energy Info (EERE)

Operator Smart Grid Project Operator Smart Grid Project Jump to: navigation, search Project Lead Midwest Independent Transmission System Operator Country United States Headquarters Location Carmel, Indiana Additional Benefit Places Iowa, Illinois, Michigan, Minnesota, Missouri, Montana, North Dakota, Ohio, Pennsylvania, South Dakota, Wisconsin Recovery Act Funding $17,271,738.00 Total Project Value $34,543,476.00 Coverage Area Coverage Map: Midwest Independent Transmission System Operator Smart Grid Project Coordinates 39.978371°, -86.1180435° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

140

Whirlpool Corporation Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Whirlpool Corporation Country United States Headquarters Location Benton Harbor, Michigan Recovery Act Funding $19,330,000 Total Project Value $39,096,275 Coverage Area Coverage Map: Whirlpool Corporation Smart Grid Project Coordinates 42.1167065°, -86.4541894° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Burbank Water and Power Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Burbank Water and Power Smart Grid Project Burbank Water and Power Smart Grid Project Jump to: navigation, search Project Lead Burbank Water and Power Country United States Headquarters Location Burbank, California Recovery Act Funding $20,000,000.00 Total Project Value $62,650,755.00 Coverage Area Coverage Map: Burbank Water and Power Smart Grid Project Coordinates 34.1808392°, -118.3089661° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

142

Avista Utilities Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Jump to: navigation, search Project Lead Avista Utilities Country United States Headquarters Location Spokane, Washington Additional Benefit Places Idaho Recovery Act Funding $20,000,000.00 Total Project Value $40,000,000.00 Coverage Area Coverage Map: Avista Utilities Smart Grid Project Coordinates 47.6587802°, -117.4260466° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

143

Stanton County Public Power District Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Stanton County Public Power District Smart Grid Project Stanton County Public Power District Smart Grid Project Jump to: navigation, search Project Lead Stanton County Public Power District Country United States Headquarters Location Stanton, Nebraska Recovery Act Funding $397,000.00 Total Project Value $794,000.00 Coverage Area Coverage Map: Stanton County Public Power District Smart Grid Project Coordinates 41.950284°, -97.2239336° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

144

American Transmission Company LLC II Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $11,444,180 Total Project Value $22,888,360 Coverage Area Coverage Map: American Transmission Company LLC II Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

145

Westar Energy, Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Westar Energy, Inc. Country United States Headquarters Location Topeka, Kansas Recovery Act Funding $19,041,565.00 Total Project Value $39,290,749.00 Coverage Area Coverage Map: Westar Energy, Inc. Smart Grid Project Coordinates 39.0483336°, -95.6780371° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

146

ISO New England, Incorporated Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Incorporated Smart Grid Project Incorporated Smart Grid Project Jump to: navigation, search Project Lead ISO New England, Incorporated Country United States Headquarters Location Holyoke, Massachusetts Additional Benefit Places Connecticut, Maine, New Hampshire, Rhode Island, Vermont Recovery Act Funding $7993714 Total Project Value $18087427 Coverage Area Coverage Map: ISO New England, Incorporated Smart Grid Project Coordinates 42.2042586°, -72.6162009° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

147

CenterPoint Energy Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead CenterPoint Energy Country United States Headquarters Location Houston, Texas Recovery Act Funding $200,000,000.00 Total Project Value $639,187,435.00 Coverage Area Coverage Map: CenterPoint Energy Smart Grid Project Coordinates 29.7632836°, -95.3632715° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

148

Duke Energy Carolinas, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Carolinas, LLC Smart Grid Project Carolinas, LLC Smart Grid Project Jump to: navigation, search Project Lead Duke Energy Carolinas, LLC Country United States Headquarters Location Charlotte, North Carolina Recovery Act Funding $3,927,899.00 Total Project Value $7,855,797.00 Coverage Area Coverage Map: Duke Energy Carolinas, LLC Smart Grid Project Coordinates 35.2270869°, -80.8431267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

149

Wellsboro Electric Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Company Smart Grid Project Company Smart Grid Project Jump to: navigation, search Project Lead Wellsboro Electric Company Country United States Headquarters Location Wellsboro, Pennsylvania Recovery Act Funding $431,625.00 Total Project Value $961,195.00 Coverage Area Coverage Map: Wellsboro Electric Company Smart Grid Project Coordinates 41.7486838°, -77.3005304° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

150

City of Quincy, FL Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

FL Smart Grid Project FL Smart Grid Project Jump to: navigation, search Project Lead City of Quincy, FL Country United States Headquarters Location Quincy, Florida Recovery Act Funding $2,471,041.00 Total Project Value $4,942,082.00 Coverage Area Coverage Map: City of Quincy, FL Smart Grid Project Coordinates 30.5871392°, -84.5832453° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

151

Pacific Northwest Smart Grid Demonstration Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2014 Benton PUD B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Stepping into smart grid Flanking the Columbia River in Washington are three sunny cities - Richland,...

152

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects(Redirected from MHK Projects/bioSTREAM Pilot Plant) Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

153

A Pilot Project in Preparation of an Aerodynamic Optimization Workshop  

E-Print Network [OSTI]

A Pilot Project in Preparation of an Aerodynamic Optimization Workshop with Lessons Learned John C-scale Aerodynamic Optimization Workshop. Three independent optimization efforts were conducted concurrently, each in the preparation of a possible future workshop on aerodynamic shape optimization. 1.0 Introduction During AIAA

Jameson, Antony

154

Results from the Texas Pilot Project on Superior Energy Performance  

E-Print Network [OSTI]

Energy Performance. Five plants in Texas are participating in this national pilot project, which began July 2008. ESL-IE-09-05-02 Proceedings of the Thirty-First Industrial Energy Technology Conference, New Orleans, LA, May 12-15, 2009 ...

Ferland, K.

155

Hydrogen Pilot Project Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Project Wind Farm Project Wind Farm Jump to: navigation, search Name Hydrogen Pilot Project Wind Farm Facility Hydrogen Pilot Project Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Idaho Synthetic Fuels Developer Idaho Synthetic Fuels Location South of Boise ID Coordinates 43.5141°, -116.088° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.5141,"lon":-116.088,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

156

EcoGrid Denmark, ForskEL (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Grid Project) Grid Project) Jump to: navigation, search Project Name EcoGrid Denmark, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

157

G4V Grid for Vehicles (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Vehicles (Smart Grid Project) Vehicles (Smart Grid Project) Jump to: navigation, search Project Name G4V Grid for Vehicles Country Spain Coordinates 40.069664°, -4.284668° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.069664,"lon":-4.284668,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

158

Category:Smart Grid Projects | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Projects Smart Grid Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

159

Category:Smart Grid Projects in Europe | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Projects in Europe Smart Grid Projects in Europe Jump to: navigation, search Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

160

Western Baldwin County, AL Grid Interconnection Project  

SciTech Connect (OSTI)

The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

Thomas DeBell

2011-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Smart Grid Projects Are Improving Performance and Helping Consumers Better Manage their Energy Use  

Broader source: Energy.gov [DOE]

After nearly five years, the 131 smart grid projects funded through the 2009 Recovery Act are nearing completion and the results are significant. Smart grid applications are producing meaningful benefits for grid operators and customers alike

162

Airline Pilot Demand Projections What this is-  

E-Print Network [OSTI]

sources of fleet projections Utilized Boeing Fleet assumptions to try and fill in Gaps (1.4% annual fleet growth) Aircraft Orders 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Boeing 737 Max 8/9 0 0 0 0 1 7 7 7 7 7 Boeing 737 700 0 0 0 0 0 0 0 0 0 0 Boeing 737 800 0 0 0 0 0 0 0 0 0 0 Boeing 737 900 9 6 6 6

Bustamante, Fabián E.

163

Waukesha Electric Systems Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Electric Systems Smart Grid Demonstration Project Electric Systems Smart Grid Demonstration Project Jump to: navigation, search Project Lead Waukesha Electric Systems Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $10,744,409.00 Total Project Value $21,548,821.00 Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

164

City of Painesville Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Painesville Smart Grid Demonstration Project Painesville Smart Grid Demonstration Project Jump to: navigation, search Project Lead City of Painesville Country United States Headquarters Location Painesville, Ohio Recovery Act Funding $3,743,570.00 Total Project Value $7,487,153.00 Coordinates 41.7244885°, -81.245657° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

165

Primus Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Demonstration Project Smart Grid Demonstration Project Jump to: navigation, search Project Lead Primus Power Corporation Country United States Headquarters Location Alameda, California Recovery Act Funding $14,000,000.00 Total Project Value $46,700,000.00 Coordinates 37.7652065°, -122.2416355° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

166

Seeo, Inc Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Seeo, Inc Smart Grid Demonstration Project Seeo, Inc Smart Grid Demonstration Project Jump to: navigation, search Project Lead Seeo, Inc Country United States Headquarters Location Berkeley, California Recovery Act Funding $6,196,060.00 Total Project Value $12,392,120.00 Coordinates 37.8715926°, -122.272747° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

167

Ktech Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Ktech Corporation Smart Grid Demonstration Project Ktech Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead Ktech Corporation Country United States Headquarters Location Albuquerque, New Mexico Recovery Act Funding $4,764,284.00 Total Project Value $9,528,567.00 Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

168

Premium Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Corporation Smart Grid Demonstration Project Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead Premium Power Corporation Country United States Headquarters Location North Reading, Massachusetts Recovery Act Funding $7,320,000.00 Total Project Value $16,080,554.00 Coordinates 42.5750939°, -71.0786653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

169

Amber Kinetics, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Kinetics, Inc. Smart Grid Demonstration Project Kinetics, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Amber Kinetics, Inc. Country United States Headquarters Location Fremont, California Recovery Act Funding $4,000,000.00 Total Project Value $10,000,000.00 Coordinates 37.5482697°, -121.9885719° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

170

Southern California Edison Company Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Company Smart Grid Demonstration Project (2) Company Smart Grid Demonstration Project (2) Jump to: navigation, search Project Lead Southern California Edison Company Country United States Headquarters Location Rosemead, California Recovery Act Funding $24,978,264.00 Total Project Value $53,510,209.00 Coordinates 34.0805651°, -118.072846° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

171

Public Service Company of New Mexico Smart Grid Demonstration Project |  

Open Energy Info (EERE)

of New Mexico Smart Grid Demonstration Project of New Mexico Smart Grid Demonstration Project Jump to: navigation, search Project Lead Public Service Company of New Mexico Country United States Headquarters Location Albuquerque, New Mexico Recovery Act Funding $1,755,931.00 Total Project Value $5,851,303.00 Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

172

The Boeing Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

The Boeing Company Smart Grid Demonstration Project The Boeing Company Smart Grid Demonstration Project Jump to: navigation, search Project Lead The Boeing Company Country United States Headquarters Location St. Louis, Missouri Recovery Act Funding $8,561,396.00 Total Project Value $17,172,844.00 Coordinates 38.646991°, -90.224967° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

173

44 Tech Inc. Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Inc. Smart Grid Demonstration Project Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead 44 Tech Inc. Country United States Headquarters Location Pittsburgh, Pennsylvania Recovery Act Funding $5,000,000.00 Total Project Value $10,000,000.00 Coordinates 40.4406248°, -79.9958864° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

174

Oncor Electric Delivery Company, LLC Smart Grid Demonstration Project |  

Open Energy Info (EERE)

Company, LLC Smart Grid Demonstration Project Company, LLC Smart Grid Demonstration Project Jump to: navigation, search Project Lead Oncor Electric Delivery Company, LLC Country United States Headquarters Location Dallas, Texas Recovery Act Funding $3,471,681.00 Total Project Value $7,279,166.00 Coordinates 32.802955°, -96.769923° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

175

Real-Time Grid Reliability Management PIER Final Project Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Real-Time Grid Reliability Management PIER Final Project Report Real-Time Grid Reliability Management PIER Final Project Report Title Real-Time Grid Reliability Management PIER Final Project Report Publication Type Report Year of Publication 2008 Authors Eto, Joseph H., Manu Parashar, Bernard C. Lesieutre, and Nancy J. Lewis Pagination 62 Date Published 12/2008 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), energy analysis and environmental impacts department Abstract The increased need to manage California's electricity grid in real time is a result of the ongoing transition from a system operated by vertically integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management - construction of new transmission lines - has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools.

176

GREEN Grid PhD Project Descriptions February 2014  

E-Print Network [OSTI]

, and with a number of electricity industry partners. The project, officially titled "Renewable Energy and the Smart Grid" will contribute to a future New Zealand with greater renewable generation and improved energy.epecentre.ac.nz. PhD Description The growth of inherently variable distributed renewable generation

Hickman, Mark

177

AMI (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Project Name AMI Project Name AMI Country Slovenia Headquarters Location Kranj, Slovenia Coordinates 46.239208°, 14.355654° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.239208,"lon":14.355654,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

178

Waste Isolation Pilot Plant, Former Construction Worker Screening Projects  

Broader source: Energy.gov (indexed) [DOE]

Construction Worker Screening Construction Worker Screening Projects Waste Isolation Pilot Plant, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

179

ICOEUR (Smart Grid Project) (Estonia) | Open Energy Information  

Open Energy Info (EERE)

ICOEUR (Smart Grid Project) (Estonia) ICOEUR (Smart Grid Project) (Estonia) Jump to: navigation, search Project Name ICOEUR Country Estonia Coordinates 58.595272°, 25.013607° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":58.595272,"lon":25.013607,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

180

DA (Distribution Automation) (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DA (Distribution Automation) (Smart Grid Project) DA (Distribution Automation) (Smart Grid Project) Jump to: navigation, search Project Name DA (Distribution Automation) Country Netherlands Coordinates 52.132633°, 5.291266° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.132633,"lon":5.291266,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Easy Street (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Easy Street (Smart Grid Project) Easy Street (Smart Grid Project) Jump to: navigation, search Project Name Easy Street Country Netherlands Headquarters Location Breda, Netherlands Coordinates 51.574806°, 4.774816° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.574806,"lon":4.774816,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

182

Clyde Gateway (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Clyde Gateway (Smart Grid Project) Clyde Gateway (Smart Grid Project) Jump to: navigation, search Project Name Clyde Gateway Country United Kingdom Coordinates 55.378052°, -3.435973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378052,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

183

DCN4TSO (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DCN4TSO (Smart Grid Project) DCN4TSO (Smart Grid Project) Jump to: navigation, search Project Name DCN4TSO Country Slovenia Coordinates 46.151241°, 14.995463° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.151241,"lon":14.995463,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

184

Charging Infrastructure for Electric Vehicles (Smart Grid Project) | Open  

Open Energy Info (EERE)

Charging Infrastructure for Electric Vehicles (Smart Grid Project) Charging Infrastructure for Electric Vehicles (Smart Grid Project) Jump to: navigation, search Project Name Charging Infrastructure for Electric Vehicles Country Sweden Headquarters Location Gothenburg, Sweden Coordinates 57.696995°, 11.9865° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":57.696995,"lon":11.9865,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

185

BeyWatch (Smart Grid Project) (Greece) | Open Energy Information  

Open Energy Info (EERE)

BeyWatch (Smart Grid Project) (Greece) BeyWatch (Smart Grid Project) (Greece) Jump to: navigation, search Project Name BeyWatch Country Greece Coordinates 39.074207°, 21.824312° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.074207,"lon":21.824312,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

186

Consumer web (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

web (Smart Grid Project) web (Smart Grid Project) Jump to: navigation, search Project Name Consumer web Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

187

BeyWatch (Smart Grid Project) (Spain) | Open Energy Information  

Open Energy Info (EERE)

BeyWatch (Smart Grid Project) (Spain) BeyWatch (Smart Grid Project) (Spain) Jump to: navigation, search Project Name BeyWatch Country Spain Coordinates 40.65564°, -4.075928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.65564,"lon":-4.075928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

188

Energy @ home (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Energy @ home (Smart Grid Project) Energy @ home (Smart Grid Project) Jump to: navigation, search Project Name Energy @ home Country Italy Coordinates 45.406162°, 9.338379° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.406162,"lon":9.338379,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

189

EWIS European wind integration study (Smart Grid Project) (Czech Republic)  

Open Energy Info (EERE)

study (Smart Grid Project) (Czech Republic) study (Smart Grid Project) (Czech Republic) Jump to: navigation, search Project Name EWIS European wind integration study Country Czech Republic Coordinates 49.817493°, 15.472962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":49.817493,"lon":15.472962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

190

EUDEEP (Smart Grid Project) (Germany) | Open Energy Information  

Open Energy Info (EERE)

EUDEEP (Smart Grid Project) (Germany) EUDEEP (Smart Grid Project) (Germany) Jump to: navigation, search Project Name EUDEEP Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

191

EUDEEP (Smart Grid Project) (Cyprus) | Open Energy Information  

Open Energy Info (EERE)

EUDEEP (Smart Grid Project) (Cyprus) EUDEEP (Smart Grid Project) (Cyprus) Jump to: navigation, search Project Name EUDEEP Country Cyprus Coordinates 35.126411°, 33.429859° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.126411,"lon":33.429859,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

192

Belgium east loop active network management (Smart Grid Project) | Open  

Open Energy Info (EERE)

Belgium east loop active network management (Smart Grid Project) Belgium east loop active network management (Smart Grid Project) Jump to: navigation, search Project Name Belgium east loop active network management Country Belgium Coordinates 50.148746°, 4.086914° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.148746,"lon":4.086914,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

193

Stockholm Royal seaport prestudy phase (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

Royal seaport prestudy phase (Smart Grid Project) Royal seaport prestudy phase (Smart Grid Project) Jump to: navigation, search Project Name Stockholm Royal seaport prestudy phase Country Sweden Headquarters Location Stockholm, Sweden Coordinates 59.332787°, 18.064487° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":59.332787,"lon":18.064487,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

194

Flexcom, ForskEL (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Flexcom, ForskEL (Smart Grid Project) Flexcom, ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Flexcom, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

195

TWENTIES (Smart Grid Project) (Brussels, Belgium) | Open Energy Information  

Open Energy Info (EERE)

TWENTIES (Smart Grid Project) (Brussels, Belgium) TWENTIES (Smart Grid Project) (Brussels, Belgium) Jump to: navigation, search Project Name TWENTIES Country Belgium Headquarters Location Brussels, Belgium Coordinates 50.850342°, 4.35171° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.850342,"lon":4.35171,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

196

Harz.EEMobility (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Harz.EEMobility (Smart Grid Project) Harz.EEMobility (Smart Grid Project) Jump to: navigation, search Project Name Harz.EEMobility Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

197

Automation and security of Supply (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

Automation and security of Supply (Smart Grid Project) Automation and security of Supply (Smart Grid Project) Jump to: navigation, search Project Name Automation and security of Supply Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

198

Active Network Management (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Management (Smart Grid Project) Management (Smart Grid Project) Jump to: navigation, search Project Name Active Network Management Country United Kingdom Coordinates 55.378052°, -3.435973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378052,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

199

Cyprus Smart metering demo (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Cyprus Smart metering demo (Smart Grid Project) Cyprus Smart metering demo (Smart Grid Project) Jump to: navigation, search Project Name Cyprus Smart metering demo Country Cyprus Coordinates 35.126411°, 33.429859° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.126411,"lon":33.429859,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

200

Mini Berlin powered by Vattenfall (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

Mini Berlin powered by Vattenfall (Smart Grid Project) Mini Berlin powered by Vattenfall (Smart Grid Project) Jump to: navigation, search Project Name Mini Berlin powered by Vattenfall Country Germany Headquarters Location Berlin, Germany Coordinates 52.523403°, 13.4114° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.523403,"lon":13.4114,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EUDEEP (Smart Grid Project) (Hungary) | Open Energy Information  

Open Energy Info (EERE)

EUDEEP (Smart Grid Project) (Hungary) EUDEEP (Smart Grid Project) (Hungary) Jump to: navigation, search Project Name EUDEEP Country Hungary Coordinates 47.162495°, 19.503304° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.162495,"lon":19.503304,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

202

DERIREC 22@Microgrid (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DERIREC 22@Microgrid (Smart Grid Project) DERIREC 22@Microgrid (Smart Grid Project) Jump to: navigation, search Project Name DERIREC 22@Microgrid Country Spain Headquarters Location Barcelona, Spain Coordinates 41.387917°, 2.169919° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.387917,"lon":2.169919,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

203

Dynamic tariffs (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

tariffs (Smart Grid Project) tariffs (Smart Grid Project) Jump to: navigation, search Project Name Dynamic tariffs Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

204

Cryogenic Storage (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Cryogenic Storage (Smart Grid Project) Cryogenic Storage (Smart Grid Project) Jump to: navigation, search Project Name Cryogenic Storage Country United Kingdom Coordinates 55.378052°, -3.435973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378052,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

205

Pilotprojekt Markisches Viertel (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

Pilotprojekt Markisches Viertel (Smart Grid Project) Pilotprojekt Markisches Viertel (Smart Grid Project) Jump to: navigation, search Project Name Pilotprojekt Markisches Viertel Country Germany Headquarters Location Berlin, Germany Coordinates 52.523403°, 13.4114° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.523403,"lon":13.4114,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

206

Distributed connected wind farms (Smart Grid Project) (Limerick, Ireland) |  

Open Energy Info (EERE)

Distributed connected wind farms (Smart Grid Project) (Limerick, Ireland) Distributed connected wind farms (Smart Grid Project) (Limerick, Ireland) Jump to: navigation, search Project Name Distributed connected wind farms Country Ireland Headquarters Location Limerick, Ireland Coordinates 52.663857°, -8.626773° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.663857,"lon":-8.626773,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

207

Charge stands (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Charge stands (Smart Grid Project) Charge stands (Smart Grid Project) Jump to: navigation, search Project Name Charge stands Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

208

A complete and normalized 61850 substation (Smart Grid Project) | Open  

Open Energy Info (EERE)

complete and normalized 61850 substation (Smart Grid Project) complete and normalized 61850 substation (Smart Grid Project) Jump to: navigation, search Project Name A complete and normalized 61850 substation Country Spain Headquarters Location Madrid, Spain Coordinates 40.488735°, -3.284912° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.488735,"lon":-3.284912,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

209

DG Demonetz Validierung (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Demonetz Validierung (Smart Grid Project) Demonetz Validierung (Smart Grid Project) Jump to: navigation, search Project Name DG Demonetz Validierung Country Austria Headquarters Location Salzburg, Austria Coordinates 47.80949°, 13.05501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.80949,"lon":13.05501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

210

Demand response medium sized industry consumers (Smart Grid Project) | Open  

Open Energy Info (EERE)

response medium sized industry consumers (Smart Grid Project) response medium sized industry consumers (Smart Grid Project) Jump to: navigation, search Project Name Demand response medium sized industry consumers Country Denmark Headquarters Location Aarhus, Denmark Coordinates 56.162937°, 10.203921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.162937,"lon":10.203921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

211

Data Exchange (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Exchange (Smart Grid Project) Exchange (Smart Grid Project) Jump to: navigation, search Project Name Data Exchange Country United Kingdom Coordinates 55.378052°, -3.435973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378052,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

212

Address (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Project Name Address Country Spain Coordinates 40.388397°, -4.526367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.388397,"lon":-4.526367,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

213

West Virginia Smart Grid Implementation Plan (WV SGIP) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WV DoE-NRCCE-APERC DRAFT February 16, 2009 WV DoE-NRCCE-APERC DRAFT February 16, 2009 1 West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Customer Complaints to WV PSC about Electric Power Service Ali Feliachi, Muhammad Choudhry, John Saymansky and Ed Sneckenberger February 16, 2009 Introduction APERC has appreciated that one of the most important sources for data on the consumer perspective of the current electric power grid in West Virginia would be the WV Public Service Commission (WV PSC). Thus, an email request was sent on December 19, 2008 to Byron Harris at the WV PSC to request any advice or approaches to determine customer and regulatory perspectives of the current electric power grid in WV. Customer Complaint Data Bryon Harris was able to provide a spreadsheet of customer complaints in West Virginia for

214

SmartGrid: Quarterly Data Summaries from the Data Hub and SmartGrid Project Information (from OpenEI and SmartGrid.gov)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Both OpenEI and SmartGrid.gov are DOE portals to a wealth of information about the federal initiatives that support the development of the technologies, policies and projects transforming the electric power industry. Projects funded through the U.S. Recovery Act are organized by type and pinned to an interactive map at http://en.openei.org/wiki/Gateway:Smart_Grid. Each project title links to more detailed information. The Quarterly Data Summaries from the Data Hub at SmartGrid.gov are also available on OpenEI at http://en.openei.org/datasets/node/928. In addition, the SmartGrid Information Center contains documents and reports that can be searched or browsed. Smart Grid Resources introduces international SmartGrid programs and sites, while OpenEI encourages users to add SmartGrid information to the repository.

215

MHK Projects/bioWAVE Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

bioWAVE Pilot Plant bioWAVE Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-37.8197,"lon":144.964,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

216

MHK Projects/BioSTREAM Pilot Plant | Open Energy Information  

Open Energy Info (EERE)

BioSTREAM Pilot Plant BioSTREAM Pilot Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-39.9872,"lon":148.051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

217

Los Angeles Air Force Base Vehicle to Grid Pilot Project  

E-Print Network [OSTI]

viability of a complex new technology as being demonstratedEnvironmental Energy Technologies Division to be presentedand Energy, Traffic Technology International, Feb-Mar 2009.

Marnay, Chris

2014-01-01T23:59:59.000Z

218

Los Angeles Air Force Base Vehicle to Grid Pilot Project  

E-Print Network [OSTI]

for the imbalance energy market or contingencies only.competitive markets for trading energy and each of its AS.potential market revenues will trump high energy costs in

Marnay, Chris

2014-01-01T23:59:59.000Z

219

Exempting Kansas City Pilot Project from Department of Energy Orders  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

In a January 18, 2011, memorandum, "Exempting Kansas City Pilot Project from Department of Energy Orders," Linton F. Brooks requested that the Kansas City Site Office develop a plan to dramatically shift oversight at the Kansas City Plant from the current approach to one that relies more heavily on: (1) the expertise of the contractor's parent organization; (2) a more functional management assurance system with real time management information provided by the contractor to the Site Office; and, (3) Federal operational awareness based on KCSO's Line Management Plan. Directives from which KCP would be exempted are DOE O 442.1A, DOE P 450.4, and the 470-series directives.

2011-01-18T23:59:59.000Z

220

Pacific Northwest GridWise Testbed Demonstration Projects; Part II. Grid Friendly Appliance Project  

SciTech Connect (OSTI)

Fifty residential electric water heaters and 150 new residential clothes dryers were modified to respond to signals received from underfrequency, load-shedding appliance controllers. Each controller monitored the power-grid voltage signal and requested that electrical load be shed by its appliance whenever electric power-grid frequency fell below 59.95 Hz. The controllers and their appliances were installed and monitored for more than a year at residential sites at three locations in Washington and Oregon. The controllers and their appliances responded reliably to each shallow underfrequency eventan average of one event per dayand shed their loads for the durations of these events. Appliance owners reported that the appliance responses were unnoticed and caused little or no inconvenience for the homes occupants.

Hammerstrom, Donald J.; Brous, Jerry; Chassin, David P.; Horst, Gale R.; Kajfasz, Robert; Michie, Preston; Oliver, Terry V.; Carlon, Teresa A.; Eustis, Conrad; Jarvegren, Olof M.; Marek, W.; Munson, Ryan L.; Pratt, Robert G.

2007-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The first pilot project of the consortium for top?down...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

USA Received: October 1, 2013 Revised: February 25, 2014 Accepted: March 13, 2014 Pilot Project 1-the identification and characterization of human histone H4 proteoforms by...

222

Advanced Security Acceleration Project for Smart Grid (ASAP-SG) | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Security Acceleration Project for Smart Grid (ASAP-SG) Advanced Security Acceleration Project for Smart Grid (ASAP-SG) June 12, 2013 Problem Statement: The goal of this project is to develop a set of computer and network security requirements for the smart grid deployment. The key problem addressed in this project is to provide actionable security guidance to utilities for secure deployment of smart grid systems. Technical Approach: This is a utility-driven, public-private collaborative project to develop system-level security requirements for smart grid technology. The set of requirements developed in the project can be used by utilities at various stages of deployment including procurement, configuration, deployment, commissioning, and operation of smart grid systems. The ASAP SG project develops security profiles for Smart Grid applications on the basis

223

US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project  

Open Energy Info (EERE)

US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Jump to: navigation, search Logo: US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Name US Virgin Islands-Energy Development in Island Nations (EDIN) Pilot Project Agency/Company /Organization National Renewable Energy Laboratory, United States Department of Energy Partner EDIN Initiative Partners Sector Energy Focus Area Energy Efficiency Topics Background analysis, Low emission development planning Website http://www.edinenergy.org/usvi Country US Virgin Islands Latin America and the Caribbean References National Renewable Energy Laboratory, EERE Supported International Activities FY 2009 Annual Operating Plan (August 25, 2009 Abstract The purpose of the EDIN pilot is to have a meaningful impact in a short duration by developing clean energy technologies, policies, and financing mechanisms for the pilot island with projects whose elements can be repeated on other islands.

224

ESB Smart Meter Projects (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

ESB Smart Meter Projects ESB Smart Meter Projects Country Ireland Headquarters Location Cork, Ireland Coordinates 51.897873°, -8.471087° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.897873,"lon":-8.471087,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

225

REAL TIME GRID RELIABILITY MANAGEMENT 2005 PIER FINAL PROJECT REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REAL TIME GRID RELIABILITY REAL TIME GRID RELIABILITY MANAGEMENT 2005 Prepared For: California Energy Commission Public Interest Energy Research Program Prepared By: Lawrence Berkeley National Laboratory PIER FINAL PROJECT REPORT LBNL-62368 ii Legal Notice This report was prepared as a result of work sponsored by the California Energy Commission (Energy Commission). It does not necessarily represent the views of the Energy Commission, its employees, or the State of California. The Energy Commission, the State of California, its employees, contractors, and subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the use of this information will not infringe upon privately owned rights. This report has not been

226

Solar LED Light Pilot Project Illuminates the Way in Alabama | Department  

Broader source: Energy.gov (indexed) [DOE]

LED Light Pilot Project Illuminates the Way in Alabama LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama September 12, 2012 - 2:15pm Addthis Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Tertia Speiser Project Officer, Golden Field Office "I want to invite everyone to come to Boaz and see the future of responsible highway lighting and power generation." -Boaz Mayor Tim Walker

227

Solar LED Light Pilot Project Illuminates the Way in Alabama | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama Solar LED Light Pilot Project Illuminates the Way in Alabama September 12, 2012 - 2:15pm Addthis Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot project. | Photo courtesy of Lionel Green, Sand Mountain Reporter. Tertia Speiser Project Officer, Golden Field Office "I want to invite everyone to come to Boaz and see the future of responsible highway lighting and power generation." -Boaz Mayor Tim Walker

228

MHK Projects/Muroran Institute of Technology Pilot Project | Open Energy  

Open Energy Info (EERE)

Technology Pilot Project Technology Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.5197,"lon":136.319,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

229

MHK Projects/Makah Bay Offshore Wave Pilot Project | Open Energy  

Open Energy Info (EERE)

Makah Bay Offshore Wave Pilot Project Makah Bay Offshore Wave Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.3238,"lon":-124.682,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

230

SustainX, Inc. Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

SustainX, Inc. Smart Grid Demonstration Project SustainX, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead SustainX, Inc. Country United States Headquarters Location West Lebanon, New Hampshire Recovery Act Funding $5,396,023.00 Total Project Value $10,792,045.00 References ARRA Smart Grid Demonstration Projects[1] This article is a stub. You can help OpenEI by expanding it. The SustainX, Inc. Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in West Lebanon, New Hampshire. Overview Design, build, and deploy a utility-scale, low-cost compressed air energy storage system to support the integration of renewable energy sources onto the grid. The 1 MW/4hr system will store potential energy in the form of compressed air in above-ground industrial pressure facilities. The

231

Talquin Electric Cooperative, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Talquin Electric Cooperative, Inc. Talquin Electric Cooperative, Inc. Country United States Headquarters Location Quincy, Florida Recovery Act Funding $8,100,000.00 Total Project Value $16,200,000.00 Coverage Area Coverage Map: Talquin Electric Cooperative, Inc. Smart Grid Project Coordinates 30.5871392°, -84.5832453° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

232

Rappahannock Electric Cooperative Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Cooperative Cooperative Country United States Headquarters Location Fredericksburg, Virginia Recovery Act Funding $15,694,097.00 Total Project Value $31,388,194.00 Coverage Area Coverage Map: Rappahannock Electric Cooperative Smart Grid Project Coordinates 38.3031837°, -77.4605399° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

233

Indianapolis Power and Light Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Indianapolis Power and Light Company Indianapolis Power and Light Company Country United States Headquarters Location Indianapolis, Indiana Recovery Act Funding $20,000,000.00 Total Project Value $48,782,341.00 Coverage Area Coverage Map: Indianapolis Power and Light Company Smart Grid Project Coordinates 39.767016°, -86.156255° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

234

Baltimore Gas and Electric Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Company Company Country United States Headquarters Location Baltimore, Maryland Recovery Act Funding $200,000,000.00 Total Project Value $451,814,234.00 Coverage Area Coverage Map: Baltimore Gas and Electric Company Smart Grid Project Coordinates 39.2903848°, -76.6121893° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

235

Southern Company Services, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Southern Company Services, Inc. Southern Company Services, Inc. Country United States Headquarters Location Birmingham, Alabama Additional Benefit Places Florida, Georgia, Mississippi, North Carolina, South Carolina Recovery Act Funding $164,527,160.00 Total Project Value $330,130,432.00 Coverage Area Coverage Map: Southern Company Services, Inc. Smart Grid Project Coordinates 33.5206608°, -86.80249° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

236

Potomac Electric Power Company (PEPCO) Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Country United States Headquarters Location Washington, District of Columbia Additional Benefit Places Maryland Recovery Act Funding $44580549 Total Project Value $89161098 Coverage Area Coverage Map: Potomac Electric Power Company (PEPCO) Smart Grid Project Coordinates 38.8951118°, -77.0363658° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

237

American Transmission Company LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

American Transmission Company LLC American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $1,330,825.00 Total Project Value $2,661,650.00 Coverage Area Coverage Map: American Transmission Company LLC Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

238

Duke Energy Business Services LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Duke Energy Business Services LLC Duke Energy Business Services LLC Country United States Headquarters Location Charlotte, North Carolina Additional Benefit Places Indiana, Ohio Recovery Act Funding $200,000,000.00 Total Project Value $688,480,400.00 Coverage Area Coverage Map: Duke Energy Business Services LLC Smart Grid Project Coordinates 35.2270869°, -80.8431267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

239

City of Leesburg, Florida Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

City of Leesburg, Florida City of Leesburg, Florida Country United States Headquarters Location Leesburg, Florida Recovery Act Funding $9,748,812.00 Total Project Value $19,497,625.00 Coverage Area Coverage Map: City of Leesburg, Florida Smart Grid Project Coordinates 28.810823°, -81.8778582° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

240

Madison Gas and Electric Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

and Electric Company and Electric Company Country United States Headquarters Location Madison, Wisconsin Recovery Act Funding $5,550,941.00 Total Project Value $11,101,881.00 Coverage Area Coverage Map: Madison Gas and Electric Company Smart Grid Project Coordinates 43.0730517°, -89.4012302° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Sacramento Municipal Utility District Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Sacramento Municipal Utility District Sacramento Municipal Utility District Country United States Headquarters Location Sacramento, California Recovery Act Funding $127506261 Total Project Value $308406477 Coverage Area Coverage Map: Sacramento Municipal Utility District Smart Grid Project Coordinates 38.5815719°, -121.4943996° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

242

City of Ruston, Louisiana Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Ruston, Louisiana Ruston, Louisiana Recovery Act Funding $4,331,650.00 Total Project Value $9,168,000.00 Coverage Area Coverage Map: City of Ruston, Louisiana Smart Grid Project Coordinates 32.5232053°, -92.637927° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

243

Cuming County Public Power District Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Cuming County Public Power District Cuming County Public Power District Country United States Headquarters Location West Point, Nebraska Recovery Act Funding $1,874,994.00 Total Project Value $3,749,988.00 Coverage Area Coverage Map: Cuming County Public Power District Smart Grid Project Coordinates 41.8416659°, -96.7086432° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

244

El Paso Electric Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Electric Electric Country United States Headquarters Location El Paso, Texas Additional Benefit Places New Mexico Recovery Act Funding $1,014,414.00 Total Project Value $2,085,095.00 Coverage Area Coverage Map: El Paso Electric Smart Grid Project Coordinates 31.7587198°, -106.4869314° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

245

Progress Energy Service Company, LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Progress Energy Service Company, LLC Progress Energy Service Company, LLC Country United States Headquarters Location Raleigh, North Carolina Additional Benefit Places South Carolina Recovery Act Funding $200000000 Total Project Value $520185889 Coverage Area Coverage Map: Progress Energy Service Company, LLC Smart Grid Project Coordinates 35.772096°, -78.6386145° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

246

Golden Spread Electric Cooperative, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Golden Spread Electric Cooperative, Inc. Golden Spread Electric Cooperative, Inc. Country United States Headquarters Location Amarillo, Texas Recovery Act Funding $19,995,000.00 Total Project Value $49,987,500.00 Coverage Area Coverage Map: Golden Spread Electric Cooperative, Inc. Smart Grid Project Coordinates 35.2219971°, -101.8312969° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

247

City of Fulton, Missouri Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Fulton, Missouri Fulton, Missouri Country United States Headquarters Location Fulton, Missouri Recovery Act Funding $1,527,641.00 Total Project Value $3,055,282.00 Coverage Area Coverage Map: City of Fulton, Missouri Smart Grid Project Coordinates 38.8467082°, -91.9479586° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

248

Central Lincoln People's Utility District Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Central Lincoln People's Utility District Central Lincoln People's Utility District Country United States Headquarters Location Newport, Oregon Recovery Act Funding $9,894,450.00 Total Project Value $19,788,900.00 Coverage Area Coverage Map: Central Lincoln People's Utility District Smart Grid Project Coordinates 44.6367836°, -124.0534505° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

249

Cleco Power LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Cleco Power LLC Cleco Power LLC Country United States Headquarters Location Pineville, Louisiana Recovery Act Funding $20,000,000.00 Total Project Value $69,026,089.00 Coverage Area Coverage Map: Cleco Power LLC Smart Grid Project Coordinates 31.3224044°, -92.4343035° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

250

Reliant Energy Retail Services, LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Reliant Energy Retail Services, LLC Reliant Energy Retail Services, LLC Country United States Headquarters Location Houston, Texas Recovery Act Funding $19839689 Total Project Value $63696548 Coverage Area Coverage Map: Reliant Energy Retail Services, LLC Smart Grid Project Coordinates 29.7632836°, -95.3632715° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

251

Idaho Power Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Idaho Power Company Idaho Power Company Country United States Headquarters Location Boise, Idaho Additional Benefit Places Oregon Recovery Act Funding $47,000,000.00 Total Project Value $94,000,000.00 Coverage Area Coverage Map: Idaho Power Company Smart Grid Project Coordinates 43.6135002°, -116.2034505° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

252

Woodruff Electric Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Woodruff Electric Woodruff Electric Country United States Headquarters Location Forrest City, Arkansas Recovery Act Funding $2,357,520.00 Total Project Value $5,016,000.00 Coverage Area Coverage Map: Woodruff Electric Smart Grid Project Coordinates 35.0081474°, -90.7898342° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

253

Guam Power Authority Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Guam Power Authority Guam Power Authority Country United States Headquarters Location Hagatna, Guam Recovery Act Funding $16,603,507.00 Total Project Value $33,207,014.00 Coverage Area Coverage Map: Guam Power Authority Smart Grid Project Coordinates 13.4770676°, 144.7494423° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

254

City of Naperville, Illinois Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Naperville, Illinois Naperville, Illinois Country United States Headquarters Location Naperville, Illinois Recovery Act Funding $10,994,000.00 Total Project Value $21,988,000.00 Coverage Area Coverage Map: City of Naperville, Illinois Smart Grid Project Coordinates 41.7858629°, -88.1472893° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

255

Pacific Northwest Generating Cooperative Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Northwest Generating Cooperative Northwest Generating Cooperative Country United States Headquarters Location Portland, Oregon Additional Benefit Places Washington, Idaho, Nevada, Utah, Montana Recovery Act Funding $19576743 Total Project Value $39172987 Coverage Area Coverage Map: Pacific Northwest Generating Cooperative Smart Grid Project Coordinates 45.5234515°, -122.6762071° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

256

Wisconsin Power and Light Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

and Light Company and Light Company Country United States Headquarters Location Madison, Wisconsin Recovery Act Funding $3,200,000.00 Total Project Value $6,400,000.00 Coverage Area Coverage Map: Wisconsin Power and Light Company Smart Grid Project Coordinates 43.0730517°, -89.4012302° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

257

Detroit Edison Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Detroit Edison Company Detroit Edison Company Country United States Headquarters Location Detroit, Michigan Recovery Act Funding $83,828,878.00 Total Project Value $167,657,756.00 Coverage Area Coverage Map: Detroit Edison Company Smart Grid Project Coordinates 42.331427°, -83.0457538° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

258

Midwest Energy Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Midwest Energy Inc. Midwest Energy Inc. Country United States Headquarters Location Hays, Kansas Recovery Act Funding $712,257.00 Total Project Value $1,424,514.00 Coverage Area Coverage Map: Midwest Energy Inc. Smart Grid Project Coordinates 38.8791783°, -99.3267702° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

259

Powder River Energy Corporation Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Country United States Country United States Headquarters Location Sundance, Wyoming Recovery Act Funding $2,554,807.00 Total Project Value $5,109,614.00 Coverage Area Coverage Map: Powder River Energy Corporation Smart Grid Project Coordinates 44.4063746°, -104.3757816° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

260

Cobb Electric Membership Corporation Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Cobb Electric Membership Corporation Cobb Electric Membership Corporation Country United States Headquarters Location Marietta, Georgia Recovery Act Funding $16,893,836.00 Total Project Value $33,787,672.00 Coverage Area Coverage Map: Cobb Electric Membership Corporation Smart Grid Project Coordinates 33.952602°, -84.5499327° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

New York Completes Smart Grid Project to Build a More Reliable...  

Energy Savers [EERE]

grid and control center project in Rensselaer, New York. Today, Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman joined with public and...

262

Demonstration of Shibboleth in Action across a Range of Security focused Grid Projects  

E-Print Network [OSTI]

Demonstration of Shibboleth in Action across a Range of Security focused Grid Projects Prof. R. O of the critical factors to the success of Grid technologies is ease of use. To encourage wider uptake, the access to large scale computational and data resources such as the National Grid Service (NGS) (www

Glasgow, University of

263

Consumer to Grid (C2G) (Smart Grid Project) (Austria) | Open Energy  

Open Energy Info (EERE)

Austria) Austria) Jump to: navigation, search Project Name Consumer to Grid (C2G) Country Austria Coordinates 47.516232°, 14.550072° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.516232,"lon":14.550072,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

264

Consumer to Grid (C2G) (Smart Grid Project) (Schwarzach, Austria) | Open  

Open Energy Info (EERE)

Schwarzach, Austria) Schwarzach, Austria) Jump to: navigation, search Project Name Consumer to Grid (C2G) Country Austria Headquarters Location Schwarzach, Austria Coordinates 47.319721°, 13.14284° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.319721,"lon":13.14284,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

265

Geothermal slim holes for small off-grid power projects  

Science Journals Connector (OSTI)

Economically viable, small (100 kWe to 1000 kWe), geothermal power generation units using slim holes are available for the production of electrical power in remote areas and for rural electrification in developing countries. Based on borehole data from geothermal fields in the United States and Japan, slim holes have been proven as adequate fuel sources for small-scale geothermal power plants (SSGPPs) and can deliver enough geothermal fluid to the wellhead in a baseload mode to be of practical interest for off-grid electrification projects. The electrical generating capacity of geothermal fluids which can be produced from typical slim holes (150-mm diameter or less), both by conventional, self-discharge, flash-steam methods for hotter geothermal reservoirs, and by binary-cycle technology with downhole pumps for low- to moderate-temperature reservoirs are estimated using a simplified theoretical approach. Depending mainly on reservoir temperature, the numerical simulations indicate that electrical capacities from a few hundred kilowatts to over one megawatt per slim hole are possible. In addition to the advantage of price per kilowatt-hour in off-grid applications, \\{SSGPPs\\} fueled by slim holes are far more environmentally benign than fossil-burning power plants, which is crucial in view of current worldwide climate-change concerns and burgeoning electricity demand in the less-developed and developing countries.

Jim Combs; Sabodh K Garg; John W Pritchett

1997-01-01T23:59:59.000Z

266

Chile-GTZ Public Properties for Grid-connected Renewable Energy Projects |  

Open Energy Info (EERE)

Properties for Grid-connected Renewable Energy Projects Properties for Grid-connected Renewable Energy Projects Jump to: navigation, search Logo: Chile-GTZ Public Properties for Grid-connected Renewable Energy Projects Name Chile-GTZ Public Properties for Grid-connected Renewable Energy Projects Agency/Company /Organization GTZ on behalf of the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) Sector Energy Topics Background analysis Website http://www.gtz.de/en/themen/27 Program Start 2008 Program End 2011 Country Chile UN Region Latin America and the Caribbean References Public Properties for Grid-connected Renewable Energy Projects[1] GTZ is working with Chile with the following objective: "Sites on state-owned properties are identified, assessed and marketed to enable the

267

A Pilot Project for Eco Industrial Parks in North Rhine-Westphalia - Extended Abstract  

Science Journals Connector (OSTI)

The state of North Rhine-Westphalias pilot project for Eco Industrial Parks aims to integrate ecological, economic, and social considerations into the planning, development and operation of new and existing i...

Veronika Wolf

2007-01-01T23:59:59.000Z

268

Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report  

SciTech Connect (OSTI)

Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

R. Johansen

2011-09-01T23:59:59.000Z

269

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA | Department  

Broader source: Energy.gov (indexed) [DOE]

49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA 49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA SUMMARY This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet

270

Project Spitfire -Towards Grid Web Service Databases Informational Document  

E-Print Network [OSTI]

and neutral with respect to programming language, platform and database product. In this paper we briefly, the international High Energy Physics (HEP) research community is facing a substantial challenge in joining, the European DataGrid (EDG) [3, 4] is under construction. In DataGrids, many small and large services spread

Hoschek, Wolfgang

271

The Sparse Grid Technique on GPUs Project: Virtual Arabia  

E-Print Network [OSTI]

simulations, e.g. simulating CO2 sequestration. The sparse grid technique is a discretization technique. In Virtual Arabia we use sparse grids for compressing and decompressing highly dimensional data coming from compared to 4 core and 8 core Intel Nehalem and 32 core AMD Opteron. Compression is up to 16 times faster

Stamatakis, Alexandros

272

Maine Deploys First U.S. Commercial, Grid-Connected Tidal Energy Project |  

Broader source: Energy.gov (indexed) [DOE]

Maine Deploys First U.S. Commercial, Grid-Connected Tidal Energy Maine Deploys First U.S. Commercial, Grid-Connected Tidal Energy Project Maine Deploys First U.S. Commercial, Grid-Connected Tidal Energy Project July 24, 2012 - 1:12pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON -- Today, Energy Secretary Steven Chu recognized the nation's first commercial, grid-connected tidal energy project off the coast of Eastport, Maine. Leveraging a $10 million investment from the Energy Department, Ocean Renewable Power Company (ORPC) will deploy its first commercial tidal energy device into Cobscook Bay this summer. The project, which injected $14 million into the local economy and has supported more than 100 local and supply chain jobs, represents the first tidal energy project in the United States with long-term contracts to sell electricity

273

Building a European Biomedical Grid on Cancer: The ACGT Integrated Project  

E-Print Network [OSTI]

- 1 - Building a European Biomedical Grid on Cancer: The ACGT Integrated Project M. Tsiknakisa.1 biomedical grid for cancer research, based on the principles of open access and open source, enhanced will be revealed, the molecular classification of cancer and the development of individualised therapies

Analyti, Anastasia

274

Steam-foam pilot project in Dome-Tumbador, Midway-Sunset field  

SciTech Connect (OSTI)

This paper describes a steam-foam pilot project in the Potter sand, Midway-Sunset field. The pilot consists of four inverted five-spot patterns with a confined producer covering 5.2 acres (2.1 ha). Steam foam was generated by continuous injection of steam with NaCl, alpha olefin sodium sulfonate, and nitrogen. Production and subsurface data, obtained from two observation wells, were used as monitoring tools in the pilot. Overall, during the first 2 years of foam injection, 207,000 bbl (32 900 m/sup 3/) of incremental oil was produced.

Not Available

1989-02-01T23:59:59.000Z

275

Maine Project Launches First Grid-Connected Offshore Wind Turbine in the  

Broader source: Energy.gov (indexed) [DOE]

Maine Project Launches First Grid-Connected Offshore Wind Turbine Maine Project Launches First Grid-Connected Offshore Wind Turbine in the U.S. Maine Project Launches First Grid-Connected Offshore Wind Turbine in the U.S. May 31, 2013 - 11:00am Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department today recognized the nation's first grid-connected offshore floating wind turbine prototype off the coast of Castine, Maine. Led by the University of Maine, this project represents the first concrete-composite floating platform wind turbine to be deployed in the world - strengthening American leadership in innovative clean energy technologies that diversify the nation's energy mix with more clean, domestic energy sources. "Developing America's vast renewable energy resources is an important part of the Energy Department's all-of-the-above strategy to pave the way

276

DOE/NREL Inner Mongolia PV/Wind Hybrid Systems Pilot Project: A Post-Installation Assessment  

SciTech Connect (OSTI)

This report assesses the Inner Mongolia Pilot Project, which disseminates wind-solar hybrid systems to a rural and remote population.

Stroup, K. K.

2005-02-01T23:59:59.000Z

277

Obama Administration Officials to Announce Job-Creating Grid Modernization  

Broader source: Energy.gov (indexed) [DOE]

Officials to Announce Job-Creating Grid Officials to Announce Job-Creating Grid Modernization Pilot Projects Obama Administration Officials to Announce Job-Creating Grid Modernization Pilot Projects October 4, 2011 - 5:03pm Addthis WASHINGTON, D.C. - Interior Secretary Ken Salazar, Agriculture Secretary Tom Vilsack, White House CEQ Chair Nancy Sutley, and Senior Advisor to the Secretary of Energy Lauren Azar will hold a press conference call to announce grid modernization pilot projects for accelerated Federal permitting tomorrow, October 5, 2011 at 11:30 a.m. EDT. The Administration's recently formed Rapid Response Team for Transmission (RRTT) will announce steps to accelerate responsible and informed deployment of several key transmission facilities. When built, the pilot projects will create thousands of construction and operations jobs, and

278

Grid resolution effects on LES of a piloted methane-air flame K. A. Kemenov  

E-Print Network [OSTI]

not only for canonical geome- tries like laboratory jet flames but also for complex ones like gas-turbine in the flame shows some residual grid dependence. Introduction Large Eddy Simulation (LES) has proved

279

City of Fort Collins Utilities Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Collins Utilities Smart Grid Project Collins Utilities Smart Grid Project Jump to: navigation, search Project Lead City of Fort Collins Utilities Country United States Headquarters Location Fort Collins, Colorado Recovery Act Funding $18,101,263.00 Total Project Value $36,202,527.00 Coverage Area Coverage Map: City of Fort Collins Utilities Smart Grid Project Coordinates 40.5852602°, -105.084423° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

280

Black Hills/Colorado Electric Utility Co. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Hills/Colorado Electric Utility Co. Smart Grid Project Hills/Colorado Electric Utility Co. Smart Grid Project Jump to: navigation, search Project Lead Black Hills/Colorado Electric Utility Co. Country United States Headquarters Location Pueblo, Colorado Recovery Act Funding $6,142,854.00 Total Project Value $12,285,708.00 Coverage Area Coverage Map: Black Hills/Colorado Electric Utility Co. Smart Grid Project Coordinates 38.2544472°, -104.6091409° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

New York Independent System Operator, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

New York Independent System Operator, Inc. Smart Grid Project New York Independent System Operator, Inc. Smart Grid Project Jump to: navigation, search Project Lead New York Independent System Operator, Inc. Country United States Headquarters Location Rensselaer, New York Recovery Act Funding $37,382,908.00 Total Project Value $75,710,735.00 Coverage Area Coverage Map: New York Independent System Operator, Inc. Smart Grid Project Coordinates 42.6425794°, -73.742898° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

282

Cheyenne Light, Fuel and Power Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Light, Fuel and Power Company Smart Grid Project Light, Fuel and Power Company Smart Grid Project Jump to: navigation, search Project Lead Cheyenne Light, Fuel and Power Company Country United States Headquarters Location Cheyenne, Wyoming Recovery Act Funding $5,033,441.00 Total Project Value $10,066,882.00 Coverage Area Coverage Map: Cheyenne Light, Fuel and Power Company Smart Grid Project Coordinates 41.1399814°, -104.8202462° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

283

FirstEnergy Service Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Company Smart Grid Project Company Smart Grid Project Jump to: navigation, search Project Lead FirstEnergy Service Company Country United States Headquarters Location Akron, Ohio Additional Benefit Places Pennsylvania Recovery Act Funding $57,470,137.00 Total Project Value $114,940,273.00 Coverage Area Coverage Map: FirstEnergy Service Company Smart Grid Project Coordinates 41.0814447°, -81.5190053° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

284

City of Glendale Water and Power Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Water and Power Smart Grid Project Water and Power Smart Grid Project Jump to: navigation, search Project Lead City of Glendale Water and Power Country United States Headquarters Location Glendale, California Recovery Act Funding $20,000,000.00 Total Project Value $51,302,425.00 Coverage Area Coverage Map: City of Glendale Water and Power Smart Grid Project Coordinates 34.1425078°, -118.255075° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

285

ALLETE Inc., d/b/a Minnesota Power Smart Grid Project | Open Energy  

Open Energy Info (EERE)

ALLETE Inc., d/b/a Minnesota Power Smart Grid Project ALLETE Inc., d/b/a Minnesota Power Smart Grid Project Jump to: navigation, search Project Lead ALLETE Inc., d/b/a Minnesota Power Country United States Headquarters Location Duluth, Minnesota Recovery Act Funding $1,544,004.00 Total Project Value $3,088,007.00 Coverage Area Coverage Map: ALLETE Inc., d/b/a Minnesota Power Smart Grid Project Coordinates 46.7832731°, -92.1065787° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

286

Memphis Light, Gas and Water Division Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Light, Gas and Water Division Smart Grid Project Light, Gas and Water Division Smart Grid Project Jump to: navigation, search Project Lead Memphis Light, Gas and Water Division Country United States Headquarters Location Memphis, Tennessee Recovery Act Funding $5,063,469.00 Total Project Value $13112363 Coverage Area Coverage Map: Memphis Light, Gas and Water Division Smart Grid Project Coordinates 35.1495343°, -90.0489801° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

287

Pacific Northwest Smart Grid Demonstration Project SUCCESS STORIES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0, 2014 AVISTA B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Creating a smart city by focusing on grid efficiencies Before Washington was granted statehood, the utility...

288

Data Management in an International Data Grid Project  

E-Print Network [OSTI]

world-wide distributed next generation experiments in High- Energy Physics, Earth Observation to coherently manage and share Petabyte-range information volumes in high-throughput production-quality Grid, security and query optimisation. 1 1 Introduction In the year 2005 a new particle accelerator, the Large

Hoschek, Wolfgang

289

Microsoft Word - PhycalAlgaePilotProject_NEPAFinalEA_October2011.doc  

Broader source: Energy.gov (indexed) [DOE]

Phycal Algae Pilot Project DOE/EA-1829 Phycal Algae Pilot Project DOE/EA-1829 Phycal, Inc. November 2011 National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of carbon dioxide (CO 2 ) emissions from industrial sources for green energy products. This project would use CO 2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost information and test data to assess its viability for future implementation at commercial scale. If approved, DOE would provide approximately 80 percent of the funding for the project.

290

Consumer to Grid (C2G) (Smart Grid Project) (Hallein, Austria) | Open  

Open Energy Info (EERE)

to Grid (C2G) to Grid (C2G) Country Austria Headquarters Location Hallein, Austria Coordinates 47.68248°, 13.10037° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.68248,"lon":13.10037,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

291

Consumer to Grid (C2G) (Smart Grid Project) (Hallein, Austria) (2) | Open  

Open Energy Info (EERE)

Name Consumer to Grid (C2G) Name Consumer to Grid (C2G) Country Austria Headquarters Location Hallein, Austria Coordinates 47.68248°, 13.10037° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.68248,"lon":13.10037,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

292

NIDIS Weekly Climate, Water and Drought Assessment Summary Upper Colorado River Basin Pilot Project  

E-Print Network [OSTI]

the past week which should decrease irrigation water demand from the Western Slope. Areas of SW Colorado of moisture moving over western Colorado on Tuesday will spark off widely scattered showers in the highNIDIS Weekly Climate, Water and Drought Assessment Summary Upper Colorado River Basin Pilot Project

293

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project was  

E-Print Network [OSTI]

In 2011, the Sustainable Community Development Grant Pilot Program was launched. The project grant was developed for the purposes of providing faculty, students and staff the opportunity to work Ways to School," which promotes safe, healthy, sustainable transportation options to local schools. Now

Pulfrey, David L.

294

Pacific Northwest Smart Grid Demonstration Project SUCCESS STORIES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

advanced proven technologies and tested emerging technologies. Smart meters and demand response Before the project, more than 12,000, or nearly half, of Lower Valley's members...

295

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA  

Broader source: Energy.gov [DOE]

This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency.

296

Long Island Power Authority Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Long Island Power Authority Country United States Headquarters Location Uniondale, New York Recovery Act Funding $12,496,047.00 Total Project Value $25,293,735.00 Coordinates 40.7003793°, -73.5929056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

297

Duke Energy Business Services, LLC Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Duke Energy Business Services, LLC Country United States Headquarters Location Charlotte, North Carolina Recovery Act Funding $21,806,232.00 Total Project Value $43,612,464.00 Coordinates 35.2270869°, -80.8431267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

298

AVTA: ARRA EV Project Electric Grid Impact report | Department...  

Broader source: Energy.gov (indexed) [DOE]

300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. EV Project - A First Look at the Impact of Electric...

299

US Recovery Act Smart Grid Energy Storage Demonstration Projects | Open  

Open Energy Info (EERE)

Storage Demonstration Projects Storage Demonstration Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

300

US Recovery Act Smart Grid Demonstration Projects | Open Energy Information  

Open Energy Info (EERE)

Projects Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

US Recovery Act Smart Grid Projects - Advanced Metering Infrastructure |  

Open Energy Info (EERE)

Projects - Advanced Metering Infrastructure Projects - Advanced Metering Infrastructure Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

302

Los Angeles Department of Water and Power Smart Grid Demonstration Project  

Open Energy Info (EERE)

Angeles Department of Water and Power Smart Grid Demonstration Project Angeles Department of Water and Power Smart Grid Demonstration Project Jump to: navigation, search Project Lead Los Angeles Department of Water and Power Country United States Headquarters Location Los Angeles, California Recovery Act Funding $60,280,000.00 Total Project Value $120,560,000.00 Coordinates 34.0522342°, -118.2436849° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

303

Power Authority of the State of New York Smart Grid Demonstration Project |  

Open Energy Info (EERE)

of the State of New York Smart Grid Demonstration Project of the State of New York Smart Grid Demonstration Project Jump to: navigation, search Project Lead Power Authority of the State of New York Country United States Headquarters Location White Plains, New York Recovery Act Funding $720,000.00 Total Project Value $1,440,000.00 Coordinates 41.0339862°, -73.7629097° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

304

New York State Electric & Gas Corporation Smart Grid Demonstration Project  

Open Energy Info (EERE)

New York State Electric & Gas Corporation Smart Grid Demonstration Project New York State Electric & Gas Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead New York State Electric & Gas Corporation Country United States Headquarters Location Binghamton, New York Recovery Act Funding $29,561,142.00 Total Project Value $125,006,103.00 Coordinates 42.0986867°, -75.9179738° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

305

The QUANTGRID Project (RO)Quantum Security in GRID Computing Applications  

Science Journals Connector (OSTI)

The QUANTGRID Project financed through the National Center for Programme Management (CNMP?Romania) is the first attempt at using Quantum Crypted Communications (QCC) in large scale operations such as GRID Computing and conceivably in the years ahead in the banking sector and other security tight communications. In relation with the GRID activities of the Center for Computing & Communications (Nat.l Inst. Nucl. Phys.IFIN?HH) the Quantum Optics Lab. (Nat.l Inst. Plasma and LasersINFLPR) and the Physics Dept. (University PolytechnicaUPB) the project will build a demonstrator infrastructure for this technology. The status of the project in its incipient phase is reported featuring tests for communications in classical security mode: socket level communications under AES (Advanced Encryption Std.) both proprietary code in C ++ technology. An outline of the planned undertaking of the project is communicated highlighting its impact in quantum physics coherent optics and information technology.

M. Dima; M. Dulea; M. Petre; C. Petre; B. Mitrica; M. Stoica; M. Udrea; R. Sterian; P. Sterian

2010-01-01T23:59:59.000Z

306

Developing Grid-based Systems for Microbial Genome Comparisons: The Microbase Project  

E-Print Network [OSTI]

Developing Grid-based Systems for Microbial Genome Comparisons: The Microbase Project Anil Wipat, University of Newcastle upon Tyne Abstract Comparative analysis of genomes allows the rich source of biological genome sequence data to be most efficiently exploited. However, the rate at which microbial

Newcastle upon Tyne, University of

307

Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager  

E-Print Network [OSTI]

Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager February 14 utilities to invest in DR Regional situational analysis � issues to address #12;Nationally � Demand ResponseSource: FERC Demand Response & Advanced Metering Report, February 2011 Peak DR 65,000 MW 1,062 MW Peak DR

308

Address (Smart Grid Project) (Switzerland) | Open Energy Information  

Open Energy Info (EERE)

Project Name Address Project Name Address Country Switzerland Coordinates 46.818188°, 8.227512° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.818188,"lon":8.227512,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

309

A review on electric vehicles and their interaction with smart grids: the case of Brazil  

Science Journals Connector (OSTI)

In the United States, the pilot project SmartGridCity has been developed by Xcel Energy in Boulder, Colorado. The main ... the improvement in the power outages detection (Xcel Energy 2008).

Ana Carolina Rodrigues Teixeira

2014-10-01T23:59:59.000Z

310

Denton County Electric Cooperative d/b/a CoServ Electric Smart Grid Project  

Open Energy Info (EERE)

d/b/a CoServ Electric Smart Grid Project d/b/a CoServ Electric Smart Grid Project Jump to: navigation, search Project Lead Denton County Electric Cooperative d/b/a CoServ Electric Country United States Headquarters Location Corinth, Texas Recovery Act Funding $17,205,844.00 Total Project Value $40,966,296.00 Coverage Area Coverage Map: Denton County Electric Cooperative d/b/a CoServ Electric Smart Grid Project Coordinates 33.1540091°, -97.0647322° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

311

Low Carbon London - A Learning Journey (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

London - A Learning Journey (Smart Grid Project) London - A Learning Journey (Smart Grid Project) Jump to: navigation, search Project Name Low Carbon London - A Learning Journey Country United Kingdom Headquarters Location London, United Kingdom Coordinates 51.500153°, -0.126236° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.500153,"lon":-0.126236,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

312

Agent based control of power systems, ForskEL (Smart Grid Project) | Open  

Open Energy Info (EERE)

Agent based control of power systems, ForskEL (Smart Grid Project) Agent based control of power systems, ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Agent based control of power systems, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

CET2001 Customer Led Network Revolution (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

CET2001 Customer Led Network Revolution (Smart Grid Project) CET2001 Customer Led Network Revolution (Smart Grid Project) Jump to: navigation, search Project Name CET2001 Customer Led Network Revolution Country United Kingdom Coordinates 55.378052°, -3.435973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378052,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

314

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

315

Automation systems for Demand Response, ForskEL (Smart Grid Project) | Open  

Open Energy Info (EERE)

systems for Demand Response, ForskEL (Smart Grid Project) systems for Demand Response, ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Automation systems for Demand Response, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

316

ESTER, Enel integrated System for TEsts on stoRage (Smart Grid Project) |  

Open Energy Info (EERE)

ESTER, Enel integrated System for TEsts on stoRage (Smart Grid Project) ESTER, Enel integrated System for TEsts on stoRage (Smart Grid Project) Jump to: navigation, search Project Name ESTER, Enel integrated System for TEsts on stoRage Country Italy Headquarters Location Livorno, Italy Coordinates 43.551876°, 10.308011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.551876,"lon":10.308011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

317

Energy Forecast, ForskEL (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Forecast, ForskEL (Smart Grid Project) Forecast, ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Energy Forecast, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

318

EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) Jump to: navigation, search Project Name EMPORA 1 + 2 EMobile Power Austria Country Austria Headquarters Location Vienna, Austria Coordinates 48.208176°, 16.373819° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.208176,"lon":16.373819,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

319

Development of Early Warning Systems (PMU/WAMS) (Smart Grid Project) | Open  

Open Energy Info (EERE)

Warning Systems (PMU/WAMS) (Smart Grid Project) Warning Systems (PMU/WAMS) (Smart Grid Project) Jump to: navigation, search Project Name Development of Early Warning Systems (PMU/WAMS) Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

320

AMIS (Smart Grid Project) (Vöcklabruck, Austria) | Open Energy Information  

Open Energy Info (EERE)

AMIS (Smart Grid Project) (Vöcklabruck, Austria) AMIS (Smart Grid Project) (Vöcklabruck, Austria) Jump to: navigation, search Project Name AMIS Country Austria Headquarters Location Vöcklabruck, Austria Coordinates 48.003342°, 13.65613° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.003342,"lon":13.65613,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EDeMa (Smart Grid Project) (Krefeld, Germany) | Open Energy Information  

Open Energy Info (EERE)

EDeMa (Smart Grid Project) (Krefeld, Germany) EDeMa (Smart Grid Project) (Krefeld, Germany) Jump to: navigation, search Project Name EDeMa Country Germany Headquarters Location Krefeld, Germany Coordinates 50.652943°, 6.339111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.652943,"lon":6.339111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

322

From wind power to heat pumps (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

From wind power to heat pumps (Smart Grid Project) From wind power to heat pumps (Smart Grid Project) Jump to: navigation, search Project Name From wind power to heat pumps Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

323

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

324

2012 SG Peer Review - Recovery Act: Secure Interoperable Open Smart Grid Demonstration Project - Tom Magee, ConEd NY  

Broader source: Energy.gov (indexed) [DOE]

Demonstration Project Demonstration Project Patricia Robison Con Edison June 8, 2012 December 2008 Smart Grid Demonstration Project Objective Life-cycle Funding FY10 - FY13 $45.4 m Technical Scope (Insert graphic here) 2 *Integrate Legacy and Smart Grid information systems *Integrate external DR into distribution grid systems: - EV/Battery storage - Building Management Systems (BMS) - Standby generation - Photovoltaic Demonstrate secure interoperable services between utility distribution systems and customer owned distributed resources (DR) December 2008 Needs and Project Targets Integrate customer owned resources into distribution operations to enable customer participation and defer capital investment *Integrate DR resources into operator platform *Implement secure communications to DR resources

325

Macroalgae for CO{sub 2} Capture and Renewable Energy - A Pilot Project  

SciTech Connect (OSTI)

The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO{sub 2}) through a technology designed to capture CO2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO{sub 2}/ NO{sub x} flue-gas removal efficiency of an innovative ??algal scrubber? technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO{sub 2} to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing contingencies, and reducing overall costs.

Kristine Wiley

2010-10-31T23:59:59.000Z

326

Emobility (Smart Grid Project) (Budapest, Hungary) | Open Energy  

Open Energy Info (EERE)

Budapest, Hungary) Budapest, Hungary) Jump to: navigation, search Project Name Emobility Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

327

EUDEEP (Smart Grid Project) (Finland) | Open Energy Information  

Open Energy Info (EERE)

Finland) Finland) Jump to: navigation, search Project Name EUDEEP Country Finland Coordinates 62.011219°, 26.037598° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":62.011219,"lon":26.037598,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

328

EUDEEP (Smart Grid Project) (Latvia) | Open Energy Information  

Open Energy Info (EERE)

Latvia) Latvia) Jump to: navigation, search Project Name EUDEEP Country Latvia Coordinates 56.879635°, 24.603189° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.879635,"lon":24.603189,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

329

Address (Smart Grid Project) (France) | Open Energy Information  

Open Energy Info (EERE)

France) France) Jump to: navigation, search Project Name Address Country France Coordinates 46.073231°, 2.427979° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.073231,"lon":2.427979,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

330

Emobility (Smart Grid Project) (Pisa, Italy) | Open Energy Information  

Open Energy Info (EERE)

Pisa, Italy) Pisa, Italy) Jump to: navigation, search Project Name Emobility Country Italy Headquarters Location Pisa, Italy Coordinates 43.716133°, 10.396584° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.716133,"lon":10.396584,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

331

Eprice (Smart Grid Project) (Italy) | Open Energy Information  

Open Energy Info (EERE)

(Italy) (Italy) Jump to: navigation, search Project Name Eprice Country Italy Coordinates 41.360317°, 12.766113° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.360317,"lon":12.766113,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

332

Etelligence (Smart Grid Project) (Cuxhaven, Germany) | Open Energy  

Open Energy Info (EERE)

Cuxhaven, Germany) Cuxhaven, Germany) Jump to: navigation, search Project Name Etelligence Country Germany Headquarters Location Cuxhaven, Germany Coordinates 53.861702°, 8.694068° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.861702,"lon":8.694068,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

333

The Detroit Edison Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

The Detroit Edison Company The Detroit Edison Company Country United States Headquarters Location Detroit, Michigan Recovery Act Funding $4,995,271.00 Total Project Value $10,877,258.00 Coordinates 42.331427°, -83.0457538° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

334

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

NSTAR Electric & Gas Corporation NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $2,362,000.00 Total Project Value $4,724,000.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

335

EUDEEP (Smart Grid Project) (Greece) | Open Energy Information  

Open Energy Info (EERE)

Greece) Greece) Jump to: navigation, search Project Name EUDEEP Country Greece Coordinates 39.074207°, 21.824312° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.074207,"lon":21.824312,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

336

EUDEEP (Smart Grid Project) (Turkey) | Open Energy Information  

Open Energy Info (EERE)

Turkey) Turkey) Jump to: navigation, search Project Name EUDEEP Country Turkey Coordinates 38.963745°, 35.24332° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.963745,"lon":35.24332,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

337

Address (Smart Grid Project) (Italy) | Open Energy Information  

Open Energy Info (EERE)

Italy) Italy) Jump to: navigation, search Project Name Address Country Italy Coordinates 41.746727°, 12.052002° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.746727,"lon":12.052002,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

338

Pacific Gas & Electric Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Pacific Gas & Electric Company Pacific Gas & Electric Company Country United States Headquarters Location San Francisco, California Recovery Act Funding $25,000,000.00 Total Project Value $355,938,600.00 Coordinates 37.7749295°, -122.4194155° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

339

BeyWatch (Smart Grid Project) (Slovenia) | Open Energy Information  

Open Energy Info (EERE)

Slovenia) Slovenia) Jump to: navigation, search Project Name BeyWatch Country Slovenia Coordinates 46.151241°, 14.995463° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.151241,"lon":14.995463,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

340

HiperDNO (Smart Grid Project) (Spain) | Open Energy Information  

Open Energy Info (EERE)

(Spain) (Spain) Jump to: navigation, search Project Name HiperDNO Country Spain Coordinates 40.563896°, -3.735352° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.563896,"lon":-3.735352,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Eprice (Smart Grid Project) (Switzerland) | Open Energy Information  

Open Energy Info (EERE)

Switzerland) Switzerland) Jump to: navigation, search Project Name Eprice Country Switzerland Coordinates 46.818188°, 8.227512° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.818188,"lon":8.227512,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

342

EUDEEP (Smart Grid Project) (Poland) | Open Energy Information  

Open Energy Info (EERE)

Poland) Poland) Jump to: navigation, search Project Name EUDEEP Country Poland Coordinates 51.919437°, 19.145136° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.919437,"lon":19.145136,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

343

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Lead NSTAR Electric & Gas Corporation Lead NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $5,267,592.00 Total Project Value $10,535,184.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

344

HiperDNO (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Project Name HiperDNO Country Slovenia Coordinates 46.151241°, 14.995463° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.151241,"lon":14.995463,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

345

EWIS European wind integration study (Smart Grid Project) (Portugal) | Open  

Open Energy Info (EERE)

Portugal) Portugal) Jump to: navigation, search Project Name EWIS European wind integration study Country Portugal Coordinates 39.095963°, -8.217773° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.095963,"lon":-8.217773,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

346

Southern California Edison Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Company Company Country United States Headquarters Location Rosemead, California Recovery Act Funding $40,134,700.00 Total Project Value $80,269,400.00 Coordinates 34.0805651°, -118.072846° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

347

BeAware (Smart Grid Project) (Italy) | Open Energy Information  

Open Energy Info (EERE)

(Italy) (Italy) Jump to: navigation, search Project Name BeAware Country Italy Coordinates 41.689323°, 12.44751° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.689323,"lon":12.44751,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

348

BeAware (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Project Name BeAware Country Finland Coordinates 61.731525°, 25.64209° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.731525,"lon":25.64209,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

349

AMIS (Smart Grid Project) (Traun, Austria) | Open Energy Information  

Open Energy Info (EERE)

Traun, Austria) Traun, Austria) Jump to: navigation, search Project Name AMIS Country Austria Headquarters Location Traun, Austria Coordinates 48.226349°, 14.23442° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.226349,"lon":14.23442,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

350

EWIS European wind integration study (Smart Grid Project) (Denmark) | Open  

Open Energy Info (EERE)

Denmark) Denmark) Jump to: navigation, search Project Name EWIS European wind integration study Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

Beacon Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Beacon Power Corporation Beacon Power Corporation Country United States Headquarters Location Tyngsboro, Massachusetts Recovery Act Funding $24,063,978.00 Total Project Value $48,127,957.00 Coordinates 42.6767568°, -71.4245085° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

352

EUDEEP (Smart Grid Project) (Czech Republic) | Open Energy Information  

Open Energy Info (EERE)

Czech Republic) Czech Republic) Jump to: navigation, search Project Name EUDEEP Country Czech Republic Coordinates 49.817493°, 15.472962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":49.817493,"lon":15.472962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

353

Address (Smart Grid Project) (SVEZIA) | Open Energy Information  

Open Energy Info (EERE)

SVEZIA) SVEZIA) Jump to: navigation, search Project Name Address Country SVEZIA Coordinates 60.128162°, 18.643501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":60.128162,"lon":18.643501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

354

AMI (Smart Grid Project) (Poland) | Open Energy Information  

Open Energy Info (EERE)

Poland) Poland) Jump to: navigation, search Project Name AMI Country Poland Coordinates 51.919437°, 19.145136° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.919437,"lon":19.145136,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project  

SciTech Connect (OSTI)

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

Dodds, K.; Daley, T.; Freifeld, B.; Urosevic, M.; Kepic, A.; Sharma, S.

2009-05-01T23:59:59.000Z

356

MHK Projects/Neptune Renewable Energy 1 10 Scale Prototype Pilot Test |  

Open Energy Info (EERE)

Renewable Energy 1 10 Scale Prototype Pilot Test Renewable Energy 1 10 Scale Prototype Pilot Test < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.7123,"lon":-0.38306,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

357

Florida Power & Light Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Project Project Jump to: navigation, search Project Lead Florida Power & Light Company Country United States Headquarters Location Miami, Florida Recovery Act Funding $200,000,000.00 Total Project Value $578,347,232.00 Coverage Area Coverage Map: Florida Power & Light Company Smart Grid Project Coordinates 25.7742657°, -80.1936589° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

358

2012 SG Peer Review - Recovery Act: AEP Ohio gridSMART Demonstration Project - Karen Sloneker, Columbus Southern Power (AEP)  

Broader source: Energy.gov (indexed) [DOE]

Program Program Peer Review Meeting AEP Ohio gridSMART ® Demonstration Project Karen Sloneker AEP Ohio gridSMART Project Director ® December 2008 AEP Ohio gridSMART ® Demonstration Project Objectives * To build an integrated secure smart grid infrastructure. * Attract, educate, enlist and retain consumers using innovative business models that provide tools to reduce costs, consumption and peak demand. * Gather data on technology and smart grid business models to forecast national impact. Life-cycle Funding 2010 - 2013 $73,660,317 Technical Scope (Insert graphic here) * 110,000 AMI meters and associated infrastructure * Consumer Managed Energy Technology (experimental tariffs, consumer programs, web portal; smart appliances, and plug-in electric vehicles) * Innovative Demand Management * Distribution Automation and Reliability

359

Condensed listing of surface boreholes at the Waste Isolation Pilot Plant Project through 31 December 1995  

SciTech Connect (OSTI)

This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreholes drilled for the purpose of site selection and characterization through 31 December 1995. The US Department of Energy (DOE) sponsored the drilling activities, which were conducted primarily by Sandia National Laboratories. The listing provides physical attributes such as location (township, range, section, and state-plane coordinates), elevation, and total borehole depth, as well as the purpose for the borehole, drilling dates, and information about extracted cores. The report also presents the hole status (plugged, testing, monitoring, etc.) and includes salient findings and references. Maps with borehole locations and times-of-drilling charts are included.

Hill, L.R.; Aguilar, R.; Mercer, J.W. [Sandia National Labs., Albuquerque, NM (United States); Newman, G. [GRAM, Inc., Albuquerque, NM (United States)

1997-01-01T23:59:59.000Z

360

Mobile biometric device (MBD) technology : summary of selected first responder experiences in pilot projects.  

SciTech Connect (OSTI)

Mobile biometric devices (MBDs) capable of both enrolling individuals in databases and performing identification checks of subjects in the field are seen as an important capability for military, law enforcement, and homeland security operations. The technology is advancing rapidly. The Department of Homeland Security Science and Technology Directorate through an Interagency Agreement with Sandia sponsored a series of pilot projects to obtain information for the first responder law enforcement community on further identification of requirements for mobile biometric device technology. Working with 62 different jurisdictions, including components of the Department of Homeland Security, Sandia delivered a series of reports on user operation of state-of-the-art mobile biometric devices. These reports included feedback information on MBD usage in both operational and exercise scenarios. The findings and conclusions of the project address both the limitations and possibilities of MBD technology to improve operations. Evidence of these possibilities can be found in the adoption of this technology by many agencies today and the cooperation of several law enforcement agencies in both participating in the pilot efforts and sharing of information about their own experiences in efforts undertaken separately.

Aldridge, Chris D.

2013-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

MHK Projects/Evopod E1 1 10 scale grid connected demonstrator | Open Energy  

Open Energy Info (EERE)

Evopod E1 1 10 scale grid connected demonstrator Evopod E1 1 10 scale grid connected demonstrator < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":54.388,"lon":-5.566,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

362

AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis  

SciTech Connect (OSTI)

This report contributes initial findings from an analysis of significant aspects of the gridSMART Real-Time Pricing (RTP) Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

2014-02-01T23:59:59.000Z

363

MHK Projects/Evopod E35 35kW grid connected demonstrator | Open Energy  

Open Energy Info (EERE)

E35 35kW grid connected demonstrator E35 35kW grid connected demonstrator < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.3028,"lon":-5.59772,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

364

Grid Infrastructures for the Electronics Domain: Requirements and Early Prototypes from an EPSRC Pilot Project  

E-Print Network [OSTI]

Sinnott,R.O. Stewart,G. Asenov,A. Millar,C. Roy,G. Roy,S. Brown,A. Proccedings of the UK e-Science All Hands Meeting, Nottingham, UK, September 2007.

Sinnott, R.O.

365

Constructing users in the smart gridinsights from the Danish eFlex project  

Science Journals Connector (OSTI)

The smart grid appears both in relation to the overall ... and thus create local overload in the distribution grids. Since extensions of the grid are very expensive, costbenefit analyses indicate that considerab...

Sophie Nyborg; Inge Rpke

2013-11-01T23:59:59.000Z

366

San Diego Gas and Electric Company Smart Grid Project | Open Energy  

Open Energy Info (EERE)

and Electric Company and Electric Company Country United States Headquarters Location San Diego, California Recovery Act Funding $28115052 Total Project Value $59427645 Coverage Area Coverage Map: San Diego Gas and Electric Company Smart Grid Project Coordinates 32.7153292°, -117.1572551° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

367

Consolidated Edison Company of New York, Inc. Smart Grid Project | Open  

Open Energy Info (EERE)

Consolidated Edison Company of New York, Inc. Consolidated Edison Company of New York, Inc. Country United States Headquarters Location New York, New York Additional Benefit Places New Jersey Recovery Act Funding $136,170,899.00 Total Project Value $272,341,798.00 Coverage Area Coverage Map: Consolidated Edison Company of New York, Inc. Smart Grid Project Coordinates 40.7142691°, -74.0059729° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

368

Technology Cooperation Agreement Pilot Project development-friendly greenhouse gas reduction, May 1999 update  

SciTech Connect (OSTI)

The Technology Cooperation Agreement Pilot Project (TCAPP) was launched by several U.S. Government agencies (USAID, EPA and DOE) in August 1997 to establish a model for climate change technology cooperation with developing and transition countries. TCAPP is currently facilitating voluntary partnerships between the governments of Brazil, China, Kazakhstan, Korea, Mexico, and the Philippines, the private sector, and the donor community on a common set of actions that will advance implementation of clean energy technologies. The six participating countries have been actively engaged in shaping this initiative along with international donors and the private sector. This program helps fulfill the US obligation to support technology transfer to developing countries under Article 4.5 of the United Nations Framework Convention on Climate Change. TCAPP also provides a mechanism to focus resources across international donor programs on the technology cooperation needs of developing and transition countries.

Benioff, R.

1999-05-11T23:59:59.000Z

369

Sandia National Laboratories: SMART Grid  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SMART Grid Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration, Energy, Energy...

370

EEnergy Project "MeRegio" (Smart Grid Project) (Ettenheim, Germany) | Open  

Open Energy Info (EERE)

Ettenheim, Germany) Ettenheim, Germany) Jump to: navigation, search Project Name EEnergy Project "MeRegio" Country Germany Headquarters Location Ettenheim, Germany Coordinates 48.252537°, 7.813286° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.252537,"lon":7.813286,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

371

EEnergy Project "MeRegio" (Smart Grid Project) (Freiamt, Germany) | Open  

Open Energy Info (EERE)

Freiamt, Germany) Freiamt, Germany) Jump to: navigation, search Project Name EEnergy Project "MeRegio" Country Germany Headquarters Location Freiamt, Germany Coordinates 48.170155°, 7.906666° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.170155,"lon":7.906666,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

372

EEnergy Project "MeRegio" (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

EEnergy Project "MeRegio" EEnergy Project "MeRegio" Country Germany Headquarters Location Göppingen, Germany Coordinates 48.703159°, 9.653999° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.703159,"lon":9.653999,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

373

EEnergy Project "MeRegio" (Smart Grid Project) (Baden-Württemberg,  

Open Energy Info (EERE)

Baden-Württemberg, Baden-Württemberg, Germany) Jump to: navigation, search Project Name EEnergy Project "MeRegio" Country Germany Headquarters Location Baden-Württemberg, Germany Coordinates 48.661606°, 9.350134° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.661606,"lon":9.350134,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

374

Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.  

SciTech Connect (OSTI)

The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

Stovall, Stacey H.

1994-08-01T23:59:59.000Z

375

GROWDERS Demonstration of Grid Connected Electricity Systems...  

Open Energy Info (EERE)

GROWDERS Demonstration of Grid Connected Electricity Systems (Smart Grid Project) (Spain) Jump to: navigation, search Project Name GROWDERS Demonstration of Grid Connected...

376

Nonlinear Projective-Iteration Methods for Solving Transport Problems on Regular and Unstructured Grids  

SciTech Connect (OSTI)

This is a project in the field of fundamental research on numerical methods for solving the particle transport equation. Numerous practical problems require to use unstructured meshes, for example, detailed nuclear reactor assembly-level calculations, large-scale reactor core calculations, radiative hydrodynamics problems, where the mesh is determined by hydrodynamic processes, and well-logging problems in which the media structure has very complicated geometry. Currently this is an area of very active research in numerical transport theory. main issues in developing numerical methods for solving the transport equation are the accuracy of the numerical solution and effectiveness of iteration procedure. The problem in case of unstructured grids is that it is very difficult to derive an iteration algorithm that will be unconditionally stable.

Dmitriy Y. Anistratov; Adrian Constantinescu; Loren Roberts; William Wieselquist

2007-04-30T23:59:59.000Z

377

An evolution of the state of affairs of grid computing : current and future projections  

E-Print Network [OSTI]

Grid computing has a potential market opportunity of $12 billion by 2007 [6] and recent business strategy alignment to support Grid Computing by the major vendors like IBM, SUN, Oracle and others has resulted in high ...

Haque, Mesbah, 1972-

2005-01-01T23:59:59.000Z

378

Off-grid energy services for the poor: Introducing LED lighting in the Millennium Villages Project in Malawi  

E-Print Network [OSTI]

Off-grid energy services for the poor: Introducing LED lighting in the Millennium Villages Project 2009 Keywords: Solar Lighting Development a b s t r a c t Lanterns that use light-emitting diodes (LEDs as a cost-competitive alternative to kerosene and other fuel-based lighting technologies, offering brighter

Modi, Vijay

379

2014 Smart Grid R&D Program Peer Review Meeting (Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

future distribution system. Develop a microgrid with the complete functions: * Grid-connected and islanded modes * Islanding transition * Resynchronization and...

380

HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT  

SciTech Connect (OSTI)

The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

HERTING DL

2008-09-16T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

US DRIVE Grid Interaction Technical Team Roadmap | Department...  

Energy Savers [EERE]

More Documents & Publications Grid Interaction Tech Team, and International Smart Grid Collaboration Grid Connectivity Research, Development & Demonstration Projects...

382

Introduction of Grid Computing Application Projects at the NASA Earth Science Technology Office  

Science Journals Connector (OSTI)

In 2003, NASA Earth Science Technology Office (ESTO) awarded funding for 20 new ... specifically used Grid computing technology in their Earth science applications:

Kai-Dee Chu; Liping Di; Peter Thornton

2006-01-01T23:59:59.000Z

383

The Rosetta Resources CO2 Storage Project - A WESTCARB Geologic Pilot Test  

E-Print Network [OSTI]

and testing the wells. Capay Shale Gas Reservoir Pilot Thethe 2-3 m thick Capay Shale gas interval containing methanedepleted gas reservoir located within the Middle Capay shale

2006-01-01T23:59:59.000Z

384

EIA - Smart Grid Legislative and Regulatory Policies and Case Studies  

Gasoline and Diesel Fuel Update (EIA)

Full report (4.0 mb) Full report (4.0 mb) Attachment A - U.S. State legislative and regulatory policies (2.0 mb) Attachment B - U.S. smart grid case studies (1.6 mb) Attachment C - International smart grid activities (0.6 mb) Maps below summarize smart grid legislation & regulation: U.S. smart meter penetration by State, 2010. Advanced metering legislation & regulation. Advanced metering legislation & regulation. Smart Grid Legislative and Regulatory Policies and Case Studies Release date: December 12, 2011 In recent years, a number of U.S. states have adopted or are considering smart grid related laws, regulations, and voluntary or mandatory requirements. At the same time, the number of smart grid pilot projects has been increasing rapidly. Recent activity includes the deployment of smart

385

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect (OSTI)

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

386

Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project  

SciTech Connect (OSTI)

Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

1995-07-01T23:59:59.000Z

387

Sandia National Laboratories: smart grid integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

smart grid integration Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

388

Sandia National Laboratories: International Smart Grid Action...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Smart Grid Action Network Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration,...

389

SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 2. Preliminary pilot plant design  

SciTech Connect (OSTI)

The preliminary design of a solar water desalination pilot plant is presented. Pilot plant drawings and process descriptions are provided. Use of solar and wind energy are discussed. Testing, performance and cost of the pilot plant are studied. (BCS)

Not Available

1986-01-01T23:59:59.000Z

390

2012 SG Peer Review - Recovery Act: Irvine Smart Grid Demonstration Project - Ardalan Kemiab, Southern California Edison  

Broader source: Energy.gov (indexed) [DOE]

Peer Peer Review Meeting Peer Review Meeting Irvine Smart Grid Demonstration (ISGD) ( ) Ed Kamiab Southern California Edison (SCE) 6/8/2012 ISGD Objective SCE' I i S t G id D t ti (ISGD) ill (Insert graphic here) SCE's Irvine Smart Grid Demonstration (ISGD) will demonstrate an integrated, scalable Smart Grid system that includes many of the interlocking pieces of an end- to-end Smart Grid system, from the transmission and distrib tion s stems to cons mer applications s ch as distribution systems to consumer applications such as smart appliances and plug-in electric vehicles. Life-cycle Funding ($K) FY2010 FY2015 1. Energy Smart Customer Devices 2 Year 2020 Distribution System Technical Scope FY2010 - FY2015 $39,612 2. Year 2020 Distribution System 3. Interoperability & Cyber Security 4. Workforce of the Future

391

EERE-Funded Project Aims to Stabilize the Energy Grid | Department...  

Office of Environmental Management (EM)

Aims to Stabilize the Energy Grid April 9, 2013 - 12:00am Addthis With EERE support, AE Solar Energy is demonstrating and commercializing a set of new technologies that can...

392

Smart Design of Stand-Alone Solar PV System for Off Grid Electrification Projects  

Science Journals Connector (OSTI)

In order to design the configuration and optimum capacity of the energy storage system as well as the entire mini-grid system optimally and efficiently, the total load...

Parimita Mohanty; Tariq Muneer

2014-01-01T23:59:59.000Z

393

Approach for Designing Solar Photovoltaic-Based Mini-Grid Projects: A Case Study from India  

Science Journals Connector (OSTI)

Having the largest rural population in the world, India confronts a huge challenge for rural electrification, especially for electrifying remote, forested and tribal habitations. Solar Photovoltaic-based mini-grids

K. Rahul Sharma; Debajit Palit

2014-01-01T23:59:59.000Z

394

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network [OSTI]

water heater (EWH) load control program operated as part of PJM Interconnections Demand ResponseDemand Response Economic and Emergency Load Response Programs Electric Thermal Storage Electric Water Heaterwater pumps and electric thermal storage space heaters. The CSP is also participating in PJMs pilot Demand Response

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

395

Waste Isolation Pilot Plant. Project progress report for month ending October 31, 1980  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is intended to serve as a nuclear waste repository for those defense transuranic wastes, both remote handled and contact handled, which requires deep geologic disposal, and to provide a separate underground facility for in-situ experiments with various waste forms. Activities in the design, technical support, and scientific program of WIPP are summarized in this report. (DLC)

Not Available

1980-01-01T23:59:59.000Z

396

Waste Isolation Pilot Plant. Project progress report for month ending September 30, 1980  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is intended to serve as a nuclear waste repository for those defense transuranic wastes and to provide a separate underground facility for in-situ experiments. This document summarizes activities in the WIPP design, technical support, and scientific program for this month.

Not Available

1980-01-01T23:59:59.000Z

397

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network [OSTI]

alternative energy educational program, Project SAW: Solar -Solar Energy Research Commission are interested in the program. Projectsolar energy. Award: Pro ect Term: ect Descr 14 months (Project

Case, C.W.

2011-01-01T23:59:59.000Z

398

GridLAB-D  

Broader source: Energy.gov (indexed) [DOE]

GridLAB-D GridLAB-D 2010 Peer Review Overview * What is GridLAB-D? * Why use GridLAB-D? * How does GridLAB-D work? * How has GridLAB-D been used so far? * What is it expected in the coming year? * Funding and management details GridLAB-D Simulates the Smart Grid Power system models Load models Market models GridLAB-D model unifies keys elements of a Smart Grid  Next generation tool  Integrates models  Smart Grid analysis  Projects  Technologies  Cost/benefits  Business cases  Multi-scale models  Seconds to decades  Links to existing tools  Open source  Contributions from  Government  Industry  Academic  Vendors  Drives need for high performance computers  Vendors can add/extract modules for their own uses 3 Why simulate the smart grid?

399

2012 SG Peer Review - Recovery Act: Pacific Northwest Smart Grid Demonstration Project - Ron Melton, Battelle Memorial Institute  

Broader source: Energy.gov (indexed) [DOE]

Overview Overview Ron Melton, Ph.D., Project Director Don Hammerstrom, Ph.D., Principal Investigator Battelle, Pacific Northwest Division Presented at DOE-OE Smart Grid R&D Peer Review June 8, 2012 PNWD-SA-9876 Pacific Northwest Demonstration Project What: * $178M, ARRA-funded, 5-year demonstration * 60,000 metered customers in 5 states Why: * Quantify costs and benefits * Develop communications protocol * Develop standards * Facilitate integration of wind and other renewables Who: Led by Battelle and partners including BPA, 11 utilities, 2 universities, and 5 vendors 2 Project Basics 3 Transactive Control Operational objectives Manage peak demand Facilitate renewable resources Address constrained resources Improve system reliability and efficiency Select economical

400

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint  

SciTech Connect (OSTI)

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

Deru, M.; Field, K.; Punjabi, S.

2014-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The effect of efficient lighting on the environment: pilot project in Palestine  

Science Journals Connector (OSTI)

The global environment facility (GEF 1994...) has funded the Mexico high-efficiency project. The main goal of the project is to reduce greenhouse gas emissions as well as local environmental ... through the repla...

Naser Tibi; Ahmad Ramahi

2005-11-01T23:59:59.000Z

402

The Harvard Clean Energy Project: Large-Scale Computational Screening and Design of Organic Photovoltaics on the World Community Grid  

Science Journals Connector (OSTI)

The Harvard Clean Energy Project: Large-Scale Computational Screening and Design of Organic Photovoltaics on the World Community Grid ... The Clean Energy Project stands out from other computational materials science approaches as it combines conventional modeling with strategies from modern drug discovery:(54-61) CEP features an automated, high-throughput infrastructure for a systematic screening of millions of OPV candidates at a first-principles electronic structure level. ... We have developed four new functionals that overcome the above-mentioned difficulties: (a) M06, a hybrid meta functional, is a functional with good accuracy "across-the-board" for transition metals, main group thermochem., medium-range correlation energy, and barrier heights; (b) M06-2X, another hybrid meta functional, is not good for transition metals but has excellent performance for main group chem., predicts accurate valence and Rydberg electronic excitation energies, and is an excellent functional for arom.-arom. ...

Johannes Hachmann; Roberto Olivares-Amaya; Sule Atahan-Evrenk; Carlos Amador-Bedolla; Roel S. Sa?nchez-Carrera; Aryeh Gold-Parker; Leslie Vogt; Anna M. Brockway; Ala?n Aspuru-Guzik

2011-08-22T23:59:59.000Z

403

GRIDS: Grid-Scale Rampable Intermittent Dispatchable Storage  

SciTech Connect (OSTI)

GRIDS Project: The 12 projects that comprise ARPA-Es GRIDS Project, short for Grid-Scale Rampable Intermittent Dispatchable Storage, are developing storage technologies that can store renewable energy for use at any location on the grid at an investment cost less than $100 per kilowatt hour. Flexible, large-scale storage would create a stronger and more robust electric grid by enabling renewables to contribute to reliable power generation.

None

2010-09-01T23:59:59.000Z

404

E-Print Network 3.0 - arctic pilot project Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the world." Mike Steele: "The Switchyard Project is designed... to better understand the ocean currents that are moving in the Arctic Ocean towards the North ... Source:...

405

Libraries of the Future (LOFT): Executive Summary CSU LA Basin Pilot Project For Developing Cost-Effective Library Services and Resources for  

E-Print Network [OSTI]

: · Print collection analysis and management strategies · Re- Design of library facilities and space space for new library services and learning areas, and can reduce overall library expenditures. CourantPage 1 Libraries of the Future (LOFT): Executive Summary CSU LA Basin Pilot Project For Developing

Su, Xiao

406

NRELs Grid Integration Lab Nominated for Prestigious Project Management Award  

Office of Energy Efficiency and Renewable Energy (EERE)

The new Energy Systems Integration Facility (ESIF) at the Energy Departments National Renewable Energy Laboratory (NREL) received a nomination as one of three international finalists for the Project Management Institute (PMI) Project of the Year Award. Although the ESIF project team didnt take home the top honor this year, we are proud of the accomplishments they made in bringing one of the most innovative new laboratories in the country from the drawing board to fruition.

407

Microsoft Word - PhycalAlgaePilotProject_NEPAFinalEA_October2011...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

technology for the reuse of carbon dioxide (CO 2 ) emissions from industrial sources for green energy products. This project would use CO 2 to grow algae for the production of...

408

Fact Sheet: Sodium-Ion Batteries for Grid-Level Applications (October 2012)  

Broader source: Energy.gov (indexed) [DOE]

Aquion Energy, Inc. Aquion Energy, Inc. American Recovery and Reinvestment Act (ARRA) Sodium-Ion Batteries for Grid-Level Applications Demonstrating low-cost, grid-scale, ambient temperature sodium-ion batteries In June 2012, Aquion Energy, Inc. completed the testing and demonstration requirements for the U.S. Department of Energy's program with its low-cost, grid-scale, ambient temperature Aqueous Hybrid Ion (AHI) energy storage device. During the three-year project, Aquion manufactured hundreds of batteries and assemble them into high-voltage, grid-scale systems. This project helped them move their aqueous electrochemical energy storage device from bench-scale testing to pilot-scale manufacturing. The testing successfully demonstrated a grid-connected, high voltage (>1,000 V), 13.5 kWh system with a 4-hour discharge.

409

Voluntary Agreements for Increasing Energy-Efficiency in Industry: Case Study of a Pilot Project with the Steel Industry in Shandong Province, China  

SciTech Connect (OSTI)

This paper describes international experience with the use of Voluntary Agreements for increasing industrial sector energy-efficiency, drawing lessons learned regarding the essential elements of the more successful programs. The paper focuses on a pilot project for implementation of a Voluntary Agreement with two steel mills in Shandong Province that was developed through international collaboration with experts in China, the Netherlands, and the U.S. Designing the pilot project involved development of approaches for energy-efficiency potential assessments for the steel mills, target-setting to establish the Voluntary Agreement energy-efficiency goals, preparing energy-efficiency plans for implementation of energy-saving technologies and measures, and monitoring and evaluating the project's energy savings.

Price, Lynn; Worrell, Ernst; Sinton, Jonathan; Yun, Jiang

2003-03-01T23:59:59.000Z

410

Kansas City Power & Light Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Kansas City Power & Light Company Country United States Headquarters Location Kansas City, Missouri Recovery Act Funding $23,940,112.00 Total Project Value $48,125,315.00 Coordinates 39.0997265°, -94.5785667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

411

SHRP 2 Project L38 Pilot Testing of Reliability Data and Analytical Products  

E-Print Network [OSTI]

Kickoff Apr 2013 Interim Update Oct 2013 Minnesota Workshop Feb 2014 Project Completion Jun 2014 Technical/22/2014 #12;Reliability ­ Results 155/22/2014 #12;Performance Measures Travel Time Index Travel Time Index is the ratio of the average observed travel time divided by the average free-flow travel time. Buffer Index

Minnesota, University of

412

Micro-grids: Practical applications of grid technology to small distributed collaborations  

E-Print Network [OSTI]

Micro-Grids: Practical Applications of Grid Technology toof the normal use of the micro-grid we have been describing.Grid system that was used in the Matisse project. MEMS Technology Micro-

Lee, Jason R.

2001-01-01T23:59:59.000Z

413

Basic data report: borehole WIPP-12 deepening. Waste Isolation Pilot Plant (WIPP) Project, southeastern New Mexico  

SciTech Connect (OSTI)

Borehole WIPP-12 was originally drilled in 1978 as an exploratory borehole to characterize the geology of the Waste Isolation Pilot Plant (WIPP) site in Eddy County, New Mexico. WIPP-12 was reentered and deepened in late 1981. WIPP-12 is located in Section 17, T22S, R31E, just outside the limit of Zone II, approximately one mile north of the exploratory shaft site. The deepening of WIPP-12 was undertaken for several reasons: to investigate the presence of an anticlinal or domal structure and thickening of halite indicated by surface seismic reflection surveys conducted in the area; to determine the nature and extent of deformation in the Castile Formation, in a location adjacent to the zone of anomalous seismic reflections found north of the well location (''Disturbed Zone''); and to characterize any fluid-bearing zones encountered in the Castile Formation while drilling. Field operations related to deepening of the borehole began November 16, 1981 and were completed January 1, 1982. The borehole was deepened through the Castile Formation to a total depth of 3927.5 ft by coring. Pressurized brine was encountered on November 22, 1981 at a depth of about 3016 ft. The brine reservoir is apparently related to a system of near-vertical fractures of unknown extent observed in Anhydrite III. The Halite I member is about 200 ft thicker than observed in undisturbed areas in the vicinity of WIPP (for example, Borehole DOE-1). Small-scale lithologic features such as folding of anhydrite stringers in halite and halite lineation appear to confirm the presence of a structural disturbance at this location. This Basic Data Report includes geologic information gathered during WIPP-12 deepening.

Black, S.R.

1982-12-01T23:59:59.000Z

414

Presentation to the EAC - Impact of Smart Grid Projects - Joe Paladino  

Broader source: Energy.gov (indexed) [DOE]

Oct 15-16, 2012 Oct 15-16, 2012 October 16, 2012 Office of Electricity Delivery and Energy Reliability SGIG Deployment Status 2 $250 $1,130 $3,430 $580 $1,960 $5,290 $0 $1,000 $2,000 $3,000 $4,000 $5,000 Transmission Assets Distribution Assets AMI and Customer System Assets SGIG Project Expenditures ($MM) Reported as of Jun. 2012 Estimated at Completion* * Based on self-reported project target from Recipients. 389 out of at least 800 networked phasor measurement units 6,103 of about 7,500 automated switches and 9,649 of about 18,500 automated capacitors 11.7 of 15.5 million residential and commercial smart meters Office of Electricity Delivery and Energy Reliability Peak and Overall Demand Reduction via AMI, Pricing and Customer Systems 3 Project Elements OG&E 770,000 customers

415

Cost benefit analysis for the implementation of smart metering with pilot  

Open Energy Info (EERE)

benefit analysis for the implementation of smart metering with pilot benefit analysis for the implementation of smart metering with pilot project (Smart Grid Project) Jump to: navigation, search Project Name Cost benefit analysis for the implementation of smart metering with pilot project Country Slovakia Coordinates 48.669025°, 19.699024° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.669025,"lon":19.699024,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

416

Building America Whole-House Solutions for Existing Homes: National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island (Fact Sheet)  

Broader source: Energy.gov [DOE]

Building Science Corporation developed a package of high-efficiency measures for retrofit of 42 homes sponsored by National Grid, resulting in energy use of approximately 40% below the Northeast regional average

417

ZeaChem Pilot Project: High-Yield Hybrid Cellulosic Ethanol Process Using High-Impact Feedstock for Commercialization  

Broader source: Energy.gov [DOE]

This pilot-scale integrated biorefinery will produce 250,000 gallons per year of cellulosic ethanol when running at full operational status.

418

The Modern Grid Initiative is a DOE-funded project managed by the National Energy Technology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rainsuit Theory of grid modernization. This is third in a series of discussions on Rainsuit Theory of grid modernization. This is third in a series of discussions on how different mindsets look at grid modernization. One of my past bosses used to share humorous theories of organizational change management from a college professor, McAdams, worthy of the great philosopher, Yogi Berra. The McAdams Theory of Grid Modernization While this column normally focuses on grid issues, generation counts. The grid is after all an energy system which includes generation, delivery, and load. So, a modern grid has a substantial partnership role with the future generation portfolio of the nation. The grid, generation, and load are not separable variables in the modern electric system. McAdams Theorem #1: Once things change, everything will be different afterwards. This theorem reflects both

419

THE NATIONAL FUSION COLLABORATORY PROJECT: APPLYING GRID TECHNOLOGY FOR MAGNETIC FUSION RESEARCH  

E-Print Network [OSTI]

of advanced software tools that reduce technical barriers to collaboration and sharing on a national scale. Our vision is to make resources -- data, computers along with analysis, simulation and visualization-institutional collaboration on fusion experiments, and improving comparisons between experiments and theory. The project

Thompson, Mary R.

420

DISCOVERY OF A LOW-MASS COMPANION TO A METAL-RICH F STAR WITH THE MARVELS PILOT PROJECT  

SciTech Connect (OSTI)

We report the discovery of a low-mass companion orbiting the metal-rich, main sequence F star TYC 2949-00557-1 during the Multi-object APO Radial Velocity Exoplanet Large-area Survey (MARVELS) pilot project. The host star has an effective temperature T{sub eff} = 6135 {+-} 40 K, logg = 4.4 {+-} 0.1, and [Fe/H] = 0.32 {+-} 0.01, indicating a mass of M = 1.25 {+-} 0.09 M{sub sun} and R = 1.15 {+-} 0.15 R{sub sun}. The companion has an orbital period of 5.69449 {+-} 0.00023 days and straddles the hydrogen burning limit with a minimum mass of 64 M{sub J} , and thus may be an example of the rare class of brown dwarfs orbiting at distances comparable to those of 'Hot Jupiters'. We present relative photometry that demonstrates that the host star is photometrically stable at the few millimagnitude level on time scales of hours to years, and rules out transits for a companion of radius {approx}>0.8 R{sub J} at the 95% confidence level. Tidal analysis of the system suggests that the star and companion are likely in a double synchronous state where both rotational and orbital synchronization have been achieved. This is the first low-mass companion detected with a multi-object, dispersed, fixed-delay interferometer.

Fleming, Scott W.; Ge Jian; Mahadevan, Suvrath; Lee, Brian; Cuong Nguyen, Duy; Morehead, Robert C.; Wan Xiaoke; Zhao Bo; Liu Jian; Guo Pengcheng; Kane, Stephen R. [Department of Astronomy, University of Florida, 211 Bryant Space Science Center, Gainesville, FL 326711-2055 (United States); Eastman, Jason D.; Siverd, Robert J.; Scott Gaudi, B. [Department of Astronomy, Ohio State University, 140 West 18th Avenue, Columbus, OH 43210 (United States); Niedzielski, Andrzej [Torun Center for Astronomy, Nicolaus Copernicus University, ul. Gagarina 11, 87-100, Torun (Poland); Sivarani, Thirupathi [Indian Institute of Astrophysics, Bangalore 560034 (India); Stassun, Keivan G.; Gary, Bruce [Department of Physics and Astronomy, Vanderbilt University, Nashville, TN 37235 (United States); Wolszczan, Alex [Department of Astronomy and Astrophysics, The Pennsylvania State University, 525 Davey Laboratory, University Park, PA 16802 (United States); Barnes, Rory, E-mail: scfleming@astro.ufl.ed [Department of Astronomy, University of Washington, P.O. Box 351580, Seattle, WA 98195 (United States)

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Landscape Measures of Rangeland Condition in the BLM Owyhee Pilot Project: Shrub Canopy Mapping, Vegetation Classification, and Detection of Anomalous Land Areas  

SciTech Connect (OSTI)

In 2006, the BLM tasked PNNL to collaborate in research being conducted under the Owyhee Uplands Pilot Project to assess rangeland condition. The objective of this effort was to provide Owyhee Uplands Pilot Project with a sophisticated suite of data and tools to assist in evaluating the health and condition of the Owyhee Uplands study area. We focused on three technical areas. The first involved enhancing existing algorithms to estimate shrub canopy cover in the Lower Reynolds Creek Watershed. The second task involved developing and applying a strategy to assess and compare three vegetation map products for the Idaho portion of the Owyhee study area. The third task developed techniques and data that can be used to identify areas exhibiting anomalous rangeland conditions (for example exotic plants or excessive bare soil exposure). This report documents the methods used, results obtained, and conclusions drawn.

Tagestad, Jerry D.; Downs, Janelle L.

2007-12-28T23:59:59.000Z

422

Presentation to the EAC - Impact of Smart Grid Projects Funded by ARRA - Joe Paladino  

Broader source: Energy.gov (indexed) [DOE]

June 11 & 12, 2012 June 11 & 12, 2012 June 12, 2012 Office of Electricity Delivery and Energy Reliability SGIG Deployment Status 2 $2,767 $888 $163 ~$4,500 ~$2,500 ~$1,000 $- $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000 $4,500 $5,000 AMI and Customer System Assets Distribution Assets Transmission Assets Total Investments (Millions $) Total Investments in 99 SGIG Projects as of March 19, 2012 Reported to date Estimated at completion 9.3 of 15.5 million residential and commercial smart meters Distribution automation equipment on 4,200 out of 6,500 circuits 195 out of over 800 networked phasor measurement units Office of Electricity Delivery and Energy Reliability Analytical Focus 3 Advanced Metering Infrastructure Operational Efficiency Improvements (60 projects)

423

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect (OSTI)

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

424

Smart Grid Resources | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Resources Smart Grid Resources Jump to: navigation, search Us.jpg US Resources The Smart Grid: An Introduction US Department of Energy Smart Grid Information Clearinghouse EIA Smartgrid.gov Energy.gov Smart Grid Smart Grid News http://www.smartgrid.gov/ SmartGrid.gov is a resource for information about the Smart Grid and government-sponsored Smart Grid projects. The information on SmartGrid.gov helps consumers and stakeholders understand the basics of a Smart Grid and the range of Smart Grid technologies, practices and benefits. What is the Smart Grid? Recovery Act Smart Grid Programs Project Reporting Project Information Tracking Deployment Title XIII of the Energy Independence and Security Act of 2007 sets forth the policy of the U.S: "to support the modernization of the nation's

425

West Pearl Queen CO2 sequestration pilot test and modeling project 2006-2008.  

SciTech Connect (OSTI)

The West Pearl Queen is a depleted oil reservoir that has produced approximately 250,000 bbl of oil since 1984. Production had slowed prior to CO{sub 2} injection, but no previous secondary or tertiary recovery methods had been applied. The initial project involved reservoir characterization and field response to injection of CO{sub 2}; the field experiment consisted of injection, soak, and venting. For fifty days (December 20, 2002, to February 11, 2003) 2090 tons of CO{sub 2} were injected into the Shattuck Sandstone Member of the Queen Formation at the West Pearl Queen site. This technical report highlights the test results of the numerous research participants and technical areas from 2006-2008. This work included determination of lateral extents of the permeability units using outcrop observations, core results, and well logs. Pre- and post-injection 3D seismic data were acquired. To aid in interpreting seismic data, we performed numerical simulations of the effects of CO{sub 2} replacement of brine where the reservoir model was based upon correlation lengths established by the permeability studies. These numerical simulations are not intended to replicate field data, but to provide insight of the effects of CO{sub 2}.

Engler, Bruce Phillip; Cooper, Scott Patrick; Symons, Neill Phillip; Bartel, Lewis Clark; Byrer, Charles (National Energy Laboratory, Morgantown, WV); Elbring, Gregory Jay; McNemar, Andrea (National Energy Laboratory, Morgantown, WV); Aldridge, David Franklin; Lorenz, John Clay

2008-08-01T23:59:59.000Z

426

Paducah Gaseous Diffusion Plant proposed pilot pump-and-treat project. Final report  

SciTech Connect (OSTI)

On March 23, 1992, R.C. Sleeman of the Department of Energy, Oak Ridge Operations Office requested that a Groundwater Corrective Actions Team be assembled to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at the Paducah Gaseous Diffusion Plant. In addition to other suggestions, the Team recommended that further characterization data be obtained for the plume. In the Fall of 1993 additional, temporary well points were installed so that groundwater samples from the shallow groundwater system and the Regional Gravel Aquifer (RGA) could be obtained to provide a three-dimensional view of groundwater contamination in the region of the plume. The results indicate that pure-phase DNAPL (trichloroethylene [TCE]) probably are present in the source area of the plume and extend in depth to the base of the RGA. Because the DNAPL likely will represent a source of a dissolved phase plume for decades it is essential that source containment take place. The Team recommends that although effective hydraulic containment can be achieved, other alternatives should be considered. For example, recent advances in emplacing low permeability barrier walls to depths of 100 to 150 ft make it possible to consider encirclement of the source of the Northwest plume.

Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Huff, D.D.; Jones, K.S.; Nickelson, M.D.; Rightmire, C.T.

1994-01-01T23:59:59.000Z

427

DLC+VIT4IP (Smart Grid Project) (United Kingdom) | Open Energy Information  

Open Energy Info (EERE)

Kingdom) Kingdom) Jump to: navigation, search Project Name DLC+VIT4IP Country United Kingdom Coordinates 55.378052°, -3.435973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378052,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

428

EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) (Salzburg, Austria)  

Open Energy Info (EERE)

Salzburg, Austria) Salzburg, Austria) Jump to: navigation, search Project Name EMPORA 1 + 2 EMobile Power Austria Country Austria Headquarters Location Salzburg, Austria Coordinates 47.80949°, 13.05501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.80949,"lon":13.05501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

429

DLC+VIT4IP (Smart Grid Project) (Israel) | Open Energy Information  

Open Energy Info (EERE)

Israel) Israel) Jump to: navigation, search Project Name DLC+VIT4IP Country Israel Coordinates 32.498569°, 35.516289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.498569,"lon":35.516289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

430

EMPORA 1 + 2 EMobile Power Austria (Smart Grid Project) (Graz, Austria) |  

Open Energy Info (EERE)

Graz, Austria) Graz, Austria) Jump to: navigation, search Project Name EMPORA 1 + 2 EMobile Power Austria Country Austria Headquarters Location Graz, Austria Coordinates 47.070713°, 15.439504° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.070713,"lon":15.439504,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

431

DLC+VIT4IP (Smart Grid Project) (Belgium) | Open Energy Information  

Open Energy Info (EERE)

(Belgium) (Belgium) Jump to: navigation, search Project Name DLC+VIT4IP Country Belgium Coordinates 50.282318°, 4.910889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.282318,"lon":4.910889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

432

DLC+VIT4IP (Smart Grid Project) (Italy) | Open Energy Information  

Open Energy Info (EERE)

Italy) Italy) Jump to: navigation, search Project Name DLC+VIT4IP Country Italy Coordinates 41.352074°, 12.249756° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.352074,"lon":12.249756,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

433

DLC+VIT4IP (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Project Name DLC+VIT4IP Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

434

NREL: Distributed Grid Integration - Solar Distributed Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Distributed Grid Integration Projects Solar Distributed Grid Integration Projects NREL provides grid integration support, system-level testing, and systems analysis for DOE's Solar Distributed Grid Integration Projects supported by the SunShot Initiative. These projects address technical issues and develop solutions for high penetration grid integration of solar technologies into the electric power system to meet the following goals: Reduce cost: reduce interconnection costs by developing streamlined procedures including advanced integration models for utility interconnection of photovoltaics (PV) Reduce market barriers: work with utilities and system integrators to reduce market barriers by providing research on impacts of integration of high penetration of PV systems and developing solutions.

435

Expanding Buildings-to-Grid (B2G) Objectives in India  

E-Print Network [OSTI]

across the Smart Grid, the largest benefits are intended forplanned Smart Grid pilots in India that could benefit B2GSmart Grid roadmap for the Calcutta Electric Supply Corporation Limited (CESC) that will evaluate the cost/benefit

Ghatikar, Girish

2014-01-01T23:59:59.000Z

436

Petrel: Data Management and Sharing Pilot | Argonne Leadership...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Cobalt Scheduler GLEAN Petrel Swift Petrel: Data Management and Sharing Pilot The Petrel Data Service pilot provides a mechanism for Argonne researchers and ALCF users to...

437

Renewables Test IQ of the Grid  

Science Journals Connector (OSTI)

...obscure the sun. Calls for a smart grid have become routine in Washington...includes $4.5 billion for smart grid demonstration projects. Utilities...Several technologies in a future smart grid could help manage this dance...

Dan Charles

2009-04-10T23:59:59.000Z

438

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Beacon Power Beacon Power Corporation Smart Grid Demonstration Project Tyngsboro Massachusetts City of Painesville Smart Grid Demonstration Project City of Painesville Smart Grid Demonstration Project Painesville Ohio Duke Energy Business Services LLC Smart Grid Demonstration Project Duke Energy Business Services LLC Smart Grid Demonstration Project Charlotte North Carolina East Penn Manufacturing Co Smart Grid Demonstration Project East Penn Manufacturing Co Smart Grid Demonstration Project Lyon Station Pennsylvania Ktech Corporation Smart Grid Demonstration Project Ktech Corporation Smart Grid Demonstration Project Albuquerque New Mexico New York State Electric Gas Corporation Smart Grid Demonstration Project New York State Electric Gas Corporation Smart Grid Demonstration Project

439

Results from the Carbon-Land Model Intercomparison Project (C-LAMP) and Availability of the Data on the Earth System Grid (ESG)  

SciTech Connect (OSTI)

This paper describes the Carbon-Land Model Intercomparison Project (C-LAMP) being carried out through a collaboration between the Community Climate System Model (CCSM) Biogeochemistry Working Group, a DOE SciDAC-2 project, and the DOE Program for Climate Model Diagnosis and Intercomparison (PCMDI). The goal of the project is to intercompare terrestrial biogeochemistry models running within the CCSM framework to determine the best set of processes to include in future versions of CCSM. As a part of the project, observational datasets are being collected and used to score the scientific performance of these models following a well-defined set of metrics. In addition, metadata standards for terrestrial biosphere models are being developed to support archival and distribution of the C-LAMP model output via the Earth System Grid (ESG). Progress toward completion of this project and preliminary results from the first set of experiments are reported.

Hoffman, Forrest M [ORNL; Covey, Curtis [Lawrence Livermore National Laboratory (LLNL); Fung, Inez [University of California, Berkeley; Randerson, Jim [University of California, Irvine; Thornton, Peter [National Center for Atmospheric Research (NCAR); Lee, Jeff [National Center for Atmospheric Research (NCAR); Rosenbloom, Nan [National Center for Atmospheric Research (NCAR); Stockli, Reto [Colorado State University, Fort Collins; Running, Steven [University of Montana, Missoula; Bernholdt, David E [ORNL; Williams, Dean [Lawrence Livermore National Laboratory (LLNL)

2007-01-01T23:59:59.000Z

440

The Modern Grid Initiative is a DOE-funded project managed by the National Energy Technology Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

McAdams Theory of grid modernization. This is final in a series of discussions McAdams Theory of grid modernization. This is final in a series of discussions on how different mindsets look at grid modernization. With four generation "X" and "Y" children growing up in our house over the last 25 years, we had the opportunity to begin to understand how this next generation of consumers, leaders, designers, and builders view the electric system. Briefly, generation X (GenX) are those who have grown up in the shadow of the Baby Boomers and are roughly 25 to 45 years old. Generation Y (GenY) are those who follow GenX. I would be the first to say that we do not completely understand where these next generations will take the grid. But, the Modern Grid team does have some interesting insights into the future possibilities.

Note: This page contains sample records for the topic "grid pilot project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Mini Smart Grid @ Copenhagen Business School: Prototype Demonstration  

Science Journals Connector (OSTI)

The mini-smart-grid project at Copenhagen Business School (MSC@CBS ... The project revolves around the concepts of Smart Grids, Smart Meters and prosumers. Smart Grids are a new method of managing electricity ......

Rasmus U. Pedersen; Szymon J. Furtak

2013-01-01T23:59:59.000Z

442

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 2 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the second cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

443

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 1 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the first cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

444

Biomedical Collaborative Pilot Grants The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative  

E-Print Network [OSTI]

Biomedical Collaborative Pilot Grants Cycle 3 The Harvard Catalyst Pilot Grants Program sponsored three cycles of Biomedical Collaborative Pilot Grants, which were directed at improving human health project. Funding decisions for the third cycle of Biomedical Collaborative Pilot Grants were announced

Church, George M.

445

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Mays Landing New Jersey Maryland District of Columbia Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Spokane Washington Idaho Baltimore Gas and Electric Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado Burbank Water and Power Smart Grid Project Burbank Water and Power Smart Grid Project Burbank California CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid

446

E-Print Network 3.0 - affect grid operations Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the new grid | white Paper www.generAtinginsights.com Summary: grid: it challenges for energy Distribution grid operators the e-energy moma project addresses... " energy...

447

Smart Grid | OpenEI Community  

Open Energy Info (EERE)

Smart Grid Smart Grid Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 16 August, 2013 - 12:21 New report from White House outlines largest problems facing United States energy grid energy grid OpenEI President Smart Grid United States White House Graham7781's picture Submitted by Graham7781(1992) Super contributor 15 August, 2013 - 09:09 DOE Report Describes Progress in the Deployment of Synchrophasor Technologies for Improved Grid Operations OpenEI PMU recovery act SGIG Smart Grid Graham7781's picture Submitted by Graham7781(1992) Super contributor 15 March, 2013 - 10:23 Quarterly Smart Grid Data available for download on OpenEI data download OpenEI quarterly Smart Grid Smartgrid.gov SmartGrid.gov is a resource for information about the Smart Grid and government-sponsored Smart Grid projects. The information on SmartGrid.gov

448

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Electric Company Smart Grid Project Atlantic City Electric Electric Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Mays Landing New Jersey Maryland District of Columbia Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Spokane Washington Idaho Consolidated Edison Company of New York Inc Smart Grid Project Consolidated Edison Company of New York Inc Smart Grid Project New York New York New Jersey El Paso Electric Smart Grid Project El Paso Electric Smart Grid Project El Paso Texas New Mexico Hawaii Electric Co Inc Smart Grid Project Hawaii Electric Co Inc Smart Grid Project Oahu Hawaii Memphis Light Gas and Water Division Smart Grid Project Memphis Light Gas and Water Division Smart Grid Project Memphis Tennessee Municipal Electric Authority of Georgia Smart Grid Project Municipal

449

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Baltimore Gas Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid Project Houston Texas Central Maine Power Company Smart Grid Project Central Maine Power Company Smart Grid Project Augusta Maine Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Wyoming City of Fulton Missouri Smart Grid Project City of Fulton Missouri

450

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Burbank Water and Power Burbank Water and Power Smart Grid Project Burbank California Central Lincoln People s Utility District Smart Grid Project Central Lincoln People s Utility District Smart Grid Project Newport Oregon City of Anaheim Smart Grid Project City of Anaheim Smart Grid Project Anaheim California City of Auburn IN Smart Grid Project City of Auburn IN Smart Grid Project Auburn Indiana City of Fort Collins Utilities Smart Grid Project City of Fort Collins Utilities Smart Grid Project Fort Collins Colorado City of Leesburg Florida Smart Grid Project City of Leesburg Florida Smart Grid Project Leesburg Florida City of Naperville Illinois Smart Grid Project City of Naperville Illinois Smart Grid Project Naperville Illinois City of Wadsworth OH Smart Grid Project City of Wadsworth OH Smart

451

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Battelle Memorial Institute Pacific Northwest Division Smart Grid Demonstration Battelle Memorial Institute Pacific Northwest Division Smart Grid Demonstration Project Battelle Memorial Institute Pacific Northwest Division Smart Grid Demonstration Project Richland Washington Beacon Power Corporation Smart Grid Demonstration Project Beacon Power Corporation Smart Grid Demonstration Project Tyngsboro Massachusetts Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Austin Texas City of Painesville Smart Grid Demonstration Project City of Painesville Smart Grid Demonstration Project Painesville Ohio Columbus Southern Power Company doing business as AEP Ohio Smart Grid Demonstration Project Columbus Southern Power Company doing business

452

Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project  

SciTech Connect (OSTI)

This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

Not Available

1992-12-29T23:59:59.000Z