1

4.2.1 GRED Drilling Award- GRED III Phase II | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights, Substantive Jump to:Species |2008 | Open GRED Drilling

2

ESMERALDA ENERGY COMPANY FINAL SCIENTIFIC TECHNICAL REPORT, January 2008, EMIGRANT SLIMHOLE DRILLING PROJECT, DOE GRED III (DE-FC36-04GO14339)  

SciTech Connect (OSTI)

The Emigrant Slimhole Drilling Project (“ESDP”) was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included detailed geologic mapping; 3-D modeling; compilation of a GIS database; and production of a conceptual geologic model followed by the successful drilling of the 2,938 foot deep 17-31 slimhole (core hole), which encountered commercial geothermal temperatures (327? F) and exhibits an increasing, conductive, temperature gradient to total depth; completion of a short injection test; and compilation of a detailed geologic core log and revised geologic cross-sections. Results of the project greatly increased the understanding of the geologic model controlling the Emigrant geothermal resource. Information gained from the 17-31 core hole revealed the existence of commercial temperatures beneath the area in the Silver Peak Core Complex which is composed of formations that exhibit excellent reservoir characteristics. Knowledge gained from the ESDP may lead to the development of a new commercial geothermal field in Nevada. Completion of the 17-31 core hole also demonstrated the cost-effectiveness of deep core drilling as an exploration tool and the unequaled value of core in understanding the geology, mineralogy, evolutional history and structural aspects of a geothermal resource.

John Deymonaz, Jeffrey G. Hulen, Gregory D. Nash, Alex Schriener

2008-01-22T23:59:59.000Z

3

Chena Hot Springs GRED III Project: Final Report Geology, Petrology...  

Open Energy Info (EERE)

hot springs area. This included pluton mapping, limited mapping of localfaults and fracture orientations, and petrology, mineralogy, geochemistry, of surface rocksamples. 2)...

4

Chena Hot Springs GRED III Project: Final Report Geology, Petrology,  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Information onChemithon Enterprises Inc Jump to:Geochemistry,

5

GRED III Final Report Clifton Hot Springs Geothermal Greenlee County, AZ  

SciTech Connect (OSTI)

Black & Veatch Corporation has prepared this report for Arizona Public Service Company, Salt River Project, and Tucson Electric Power Company (APS/SRP/TEP). The purpose of this report is to assess the prospects for significant renewable energy development in Arizona. The scope of the study is limited to Arizona projects that would export power to the grid (that is, not distributed energy projects). This study includes a review of the current status of renewable energy in Arizona, characterization of renewable power generation technologies, assessment of Arizona''s renewable resources, and an assessment of key risk factors. This section summarizes the key findings in these areas.

Brown, David E.

2006-06-15T23:59:59.000Z

6

Final Technical Report; Geothermal Resource Evaluation and Definitioni (GRED) Program-Phases I, II, and III for the Animas Valley, NM Geothermal Resource  

SciTech Connect (OSTI)

This report contains a detailed summary of a methodical and comprehensive assessment of the potential of the Animas Valley, New Mexico geothermal resource leasehold owned by Lightning Dock Geothermal, Inc. Work described herein was completed under the auspices of the Department of Energy (DOE) Cooperative Agreement DE-FC04-00AL66977, Geothermal Resource Evaluation and Definition (GRED) Program, and the work covers the time span from June 2001 through June 2004. Included in this new report are detailed results from the GRED Program, including: geophysical and geochemical surveys, reflection seismic surveys, aeromagnetic surveys, gravity and electrical resistivity surveys, soil thermal ion and soil carbon dioxide flux surveys, four temperature gradient holes, and one deep exploratory well.

Cunniff, Roy A.; Bowers, Roger L.

2005-08-01T23:59:59.000Z

7

New Methods In Exploration At The Socorro Peak Kgra- A Gred Iii Project |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithunCenter Jump to:2Harvest JumpJump to:LoadingLondon

8

Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing  

SciTech Connect (OSTI)

This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

Henkle, William R.; Ronne, Joel

2008-06-15T23:59:59.000Z

9

GRED III Phase II | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, search Equivalent URIFrontier,Jump to:Wilmette,Transport &GM

10

Phase I Report, US DOE GRED II Program  

SciTech Connect (OSTI)

Noramex Corporation Inc, a Nevada company, owns a 100% interest in geothermal leases at the Blue Mountain Geothermal Area, Humboldt County, Nevada. The company is exploring the site for a geothermal resource suitable for development for electric power generation or In the spring of 2002, Noramex drilled the first geothermal observation hole at Blue Mountain, under a cost-share program with the U.S Department of Energy (DOE), under the DOE's Geothermal Exploration and Resource Definition (GRED) program, (Cooperative Agreement No. DE-FC04-00AL66972). DEEP BLUE No.1 was drilled to a total depth of 672.1 meters (2205 feet) and recorded a maximum temperature of 144.7 C (292.5 F). Noramex Corporation will now drill a second slim geothermal observation test hole at Blue Mountain, designated DEEP BLUE No.2. The hole will be drilled under a cost-share program with the DOE, under the DOE's Geothermal Exploration and Resource Definition II (GRED II) program, (Cooperative Agreement No. DE-FC04-2002AL68297). This report comprises Phase I of Cooperative Agreement No. DE-FC04-2002AL68297 of the GRED II program. The report provides an update on the status of resource confirmation at the Blue Mountain Geothermal Area, incorporating the results from DEEP BLUE No.1, and provides the technical background for a second test hole. The report also outlines the proposed drilling program for slim geothermal observation test hole DEEP BLUE No.2.

Fairbank Engineering Ltd.

2003-04-23T23:59:59.000Z

11

GRED STUDIES AND DRILLING OF AMERICULTURE STATE 2, AMERICULTURE TILAPIA FARM LIGHTNING DOCK KGRA, ANIMAS VALLEY, NM  

SciTech Connect (OSTI)

This report summarizes the GRED drilling operations in the AmeriCulture State 2 well with an overview of the preliminary geologic and geothermal findings, from drill cuttings, core, geophysical logs and water geochemical sampling.

Witcher, James

2006-08-01T23:59:59.000Z

12

EIS-0374: Klondike III/ Bigelow Canyon Wind Integration Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to approve an interconnection requested by PPM Energy, Inc. (PPM) to integrate electrical power from their proposed Klondike III Wind roject (Wind Project) into the Federal Columbia River Transmission System (FCRTS).

13

Phase III Early Restoration Projects Alabama Florida Louisiana Mississippi Texas  

E-Print Network [OSTI]

counties. The project includes reef designs to be constructed at various depths. The deep water "nearshore and limestone layers with spacers between the layers, in less than 20 feet deep water and within 950 feetPhase III Early Restoration Projects Alabama · Florida · Louisiana · Mississippi · Texas NOAA

14

Geothermal: Sponsored by OSTI -- ESMERALDA ENERGY COMPANY FINAL...  

Office of Scientific and Technical Information (OSTI)

ESMERALDA ENERGY COMPANY FINAL SCIENTIFIC TECHNICAL REPORT, January 2008, EMIGRANT SLIMHOLE DRILLING PROJECT, DOE GRED III (DE-FC36-04GO14339) Geothermal Technologies Legacy...

15

The Atlas3D project --III. A census of the stellar angular momentum within the  

E-Print Network [OSTI]

The Atlas3D project -- III. A census of the stellar angular momentum within the effective radius style file v2.2) The ATLAS3D project ­ III. A census of the stellar angular momentum within¨ur extraterrestrische Physik, PO Box 1312, D-85478 Garching, Germany 8Space Telescope European Coordinating Facility

Bureau, Martin

16

Policy and procedures for classification of Class III groundwater at UMTRA Project sites. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy's )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters.

Not Available

1989-03-01T23:59:59.000Z

17

Policy and procedures for classification of Class III groundwater at UMTRA Project sites. Final  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy`s )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters.

Not Available

1989-03-01T23:59:59.000Z

18

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE’s Western Area Power Administration transmission system.

19

Secretary's annual report to Congress. Volume III. Project summaries  

SciTech Connect (OSTI)

Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

None

1981-01-01T23:59:59.000Z

20

Black Rock III Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: Energy ResourcesJersey:form ViewBlack Diamond Power Co JumpHawkIII Geothermal

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Kotzebue Wind Project Phase II & III | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:Keystone Clean Air JumpMaine. Its FIPSJVII & III Jump

22

Phase III Early Restoration Projects Alabama Florida Louisiana Mississippi Texas  

E-Print Network [OSTI]

Horizon oil spill, benthic secondary productivity and salt marsh habitats along Florida's Panhandle Research Reserve Office Complex and Nature Center in Eastpoint. The area has been the location of previous,605. Deepwater Horizon Oil Spill Natural Resource Damage Assessment Florida: Living Shoreline Projects FOR MORE

23

Raft River III Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColoradosource HistoryRaft River Sector Geothermal energyProject

24

Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

United States. Bonneville Power Administration

2006-10-25T23:59:59.000Z

25

PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT SELECTIONS

26

Phase III Proposed Early Restoration Project Alabama Florida Louisiana Mississippi Texas  

E-Print Network [OSTI]

to be constructed at various depths. The deep water "nearshore reefs" would have a single, prefabricated modular, in less than 20 feet deep water and within 950 feet of shore. Deepwater Horizon Oil Spill Natural ResourcePhase III Proposed Early Restoration Project Alabama · Florida · Louisiana · Mississippi · Texas

27

Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.  

SciTech Connect (OSTI)

BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative impact of this project on wildlife when combined with other proposed wind projects in the region. The low to high impacts to visual resources reflect the effect that the transmission line and the turbine strings from both wind projects would have on viewers in the local area, but this impact diminishes with distance from the project.

United States. Bonneville Power Administration

2006-09-01T23:59:59.000Z

28

III  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. | EMSL Bubblesstructure link to2, Issue 27, aIII

29

EA-1898: Southwest Regional Partnership on Carbon Sequestration Phase III Gordon Creek Project near Price, Utah in Carbon County  

Broader source: Energy.gov [DOE]

This EA will evaluate the environmental impacts of a proposal for Phase III field deployment to demonstrate commercial-scale carbon storage technologies.This Phase III large-scale carbon dioxide injection project will combine science and engineering from many disciplines to successfully sequester and monitor carbon storage. [NOTE: This EA has been cancelled].

30

The Decovalex III Project: A Summary of Activities and LessonsLearned  

SciTech Connect (OSTI)

Initiated in 1992, the DECOVALEX project is an international collaboration for advancing the understanding and modeling of coupled thermo-hydro-mechanical (THM) processes in geologic systems. The project has made important scientific achievements through three stages and is progressing in its fourth stage. It has played a key role in the development of mathematical modeling and in situ testing of coupled THM processes in fractured rock and buffer/backfill materials, a subject of importance for performance assessment of radioactive waste geologic repositories. This paper summarizes studies under the most recent stage of the project, DECOVALEX III (2000-2003). These studies include those of two major field experiments: (a) the FEBEX experiment at Grimsel, Switzerland, investigating coupled THM processes in a crystalline rock-bentonite system, and (b) the Drift Scale Test (DST) experiment at Yucca Mountain, Nevada, investigating coupled THM processes in unsaturated tuff. These are two of the largest multiyear heater tests undertaken to date for the study of coupled THM processes in geological systems. In addition, three so-called benchmark tests are also studied to evaluate the impact of coupled THM processes under different scenarios and geometries. Within the DECOVALEX project, multiple research teams participated in each of the studies, using different approaches and computer codes. Comparisons of results have provided insight into coupled THM processes, which in turn has stimulated further development of our modeling capabilities. Lessons learned from these studies are discussed. The scientific advances and enhanced insight gained through this kind of international cooperation illustrate the effectiveness of the DECOVALEX project.

Tsang, Chin-Fu; Jing, Lanru; Stephansson, Ove; Kautsky, Fritz

2005-03-21T23:59:59.000Z

31

Hanford spent nuclear fuel project recommended path forward, volume III: Alternatives and path forward evaluation supporting documentation  

SciTech Connect (OSTI)

Volume I of the Hanford Spent Nuclear Fuel Project - Recommended Path Forward constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. Volume II provided a comparative evaluation of four Alternatives for the Path Forward and an evaluation for the Recommended Path Forward. Although Volume II contained extensive appendices, six supporting documents have been compiled in Volume III to provide additional background for Volume II.

Fulton, J.C.

1994-10-01T23:59:59.000Z

32

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Sustainability of the UBC Food System Project III Scenario 8-Perceptions of UBC  

E-Print Network [OSTI]

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Sustainability of the UBC Food System Project III Scenario 8- Perceptions of UBC Customers regarding the price of food at UBC Sustainability of the UBC Food System Project III Scenario 8- Perceptions of UBC Customers regarding the price

33

Phase III Proposed Early Restoration Project Alabama Florida Louisiana Mississippi Texas  

E-Print Network [OSTI]

are proposing six recreational use projects in Bay County. As a result of the Deepwater Horizon oil spill Access along Florida's Gulf Coast: City of Mexico Beach Marina project would remove and replace eighteen surface and increasing the width at the existing Mexico Beach Canal Park boat ramp in the City of Mexico

34

Wind River Watershed Project; Volume I of III Reports A thru E, 1998 Annual Report.  

SciTech Connect (OSTI)

This report describes the ongoing efforts to document life history strategies of steelhead in the Wind River watershed and to formulate criteria for ranking restoration needs and proposed projects.

Connolly, Patrick J.

1999-11-01T23:59:59.000Z

35

u.s DI!P.-\\RTlIII!NT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DIP.-RTlIIINT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DI11'FlU.fiNATION RECIPIENT:Vennont Sustainable Jobs Fund PROJECf TITLE : Vennont Biofuels Initiative: Borderview...

36

PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT SELECTIONS|

37

Annex III-evaluation of past and ongoing enhanced oil recovery projects  

SciTech Connect (OSTI)

The Infill Drilling Predictive Model (IDPM) was developed by Scientific Software-Intercomp (SSI) for the Bartlesville Project Office (BPO) of the United States Department of Energy (DOE). The model and certain adaptations thereof were used in conjunction with other models to support the Interstate Oil and Gas Compact Commission`s (IOGCC) 1993 state-by-state assessment of the potential domestic reserves achievable through the application of Advanced Secondary Recovery (ASR) and Enhanced Oil Recovery (EOR) techniques. Funding for this study was provided by the DOE/BPO, which additionally provided technical support. The IDPM is a three-dimensional (stratified, five-spot), two-phase (oil and water) model which uses a minimal amount of reservoir and geologic data to generate production and recovery forecasts for ongoing waterflood and infill drilling projects. The model computes water-oil displacement and oil recovery using finite difference solutions within streamtubes. It calculates the streamtube geometries and uses a two-dimensional reservoir simulation to track fluid movement in each streamtube slice. Thus the model represents a hybrid of streamtube and numerical simulators.

Not Available

1995-02-01T23:59:59.000Z

38

$XMM-Newton$ $?$ project: III. Gas mass fraction shape in high redshift clusters  

E-Print Network [OSTI]

We study the gas mass fraction, $f\\_{\\rm gas},$ behavior in $XMM-Newton$ $\\Omega$ project. The typical $f\\_{\\rm gas}$ shape of high redshift galaxy clusters follows the global shape inferred at low redshift quite well. This result is consistent with the gravitational instability picture leading to self similar structures for both the dark and baryonic matter. However, the mean $f\\_{\\rm gas} in distant clusters shows some differences to local ones, indicating a departure from strict scaling. This result is consistent with the observed evolution in the luminosity-temperature relation. We quantitatively investigate this departure from scaling laws. Within the local sample we used, a moderate but clear variation of the amplitude of the gas mass fraction with temperature is found, a trend that weakens in the outer regions. These variations do not explain departure from scaling laws of our distant clusters. An important implication of our results is that the gas fraction evolution, a test of the cosmological parameters, can lead to biased values when applied at radii smaller than the virial radius. From our $XMM$ clusters, the apparent gas fraction at the virial radius is consistent with a non-evolving universal value in a high matter density model and not with a concordance.

Rachida Sadat; Alain Blanchard; Sebastien C. Vauclair; David H. Lumb; James Bartlett; A. K. Romer; Jean-Philippe Bernard; Michel Boer; Philippe Marty; Jukka Nevalainen; Douglas J. Burke; C. A. Collins; Robert C. Nichol

2005-03-19T23:59:59.000Z

39

Observation Targeting for the Tehachapi Pass and Mid-Columbia Basin: WindSENSE Phase III Project Summary Report  

SciTech Connect (OSTI)

The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height ({approx}80 m). In Phase III of the project, the focus was on the Mid-Columbia Basin region which encompasses the Bonneville Power Administration (BPA) wind generation area shown in Figure 1 that includes Klondike, Stateline, and Hopkins Ridge wind plants. The typical hub height of a wind turbine is approximately 80-m above ground level (AGL). So it would seem that building meteorological towers in the region upwind of a wind generation facility would provide data necessary to improve the short-term forecasts for the 80-m AGL wind speed. However, this additional meteorological information typically does not significantly improve the accuracy of the 0- to 6-hour ahead wind power forecasts because processes controlling wind variability change from day-to-day and, at times, from hour-to-hour. It is also important to note that some processes causing significant changes in wind power production function principally in the vertical direction. These processes will not be detected by meteorological towers at off-site locations. For these reasons, it is quite challenging to determine the best type of sensors and deployment locations. To address the measurement deployment problem, Ensemble Sensitivity Analysis (ESA) was applied in the Phase I portion of the WindSENSE project. The ESA approach was initially designed to produce spatial fields that depict the sensitivity of a forecast metric to a set of prior state variables selected by the user. The best combination of variables and locations to improve the forecast was determined using the Multiple Observation Optimization Algorithm (MOOA) developed in Phase I. In Zack et al. (2010a), the ESA-MOOA approach was applied and evaluated for the wind plants in the Tehachapi Pass region for a period during the warm season. That research demonstrated that forecast sensitivity derived from the dataset was characterized by well-defined, localized patterns for a number of state variables such as the 80-m wind and the 25-m to 1-km temperature difference prior to the forecast time. The sensitivity patterns produced as part of the Tehachapi Pass study were coherent and consistent with the basic physical processes that drive wind patterns in the Tehachapi area. In Phase II of the WindSENSE project, the ESA-MOOA approach was extended and applied to the wind plants located in the Mid-Columbia Basin wind generation area of Washington-Oregon during the summer and to the Tehachapi Pass region during the winter. The objective of this study was to identify measurement locations and variables that have the greatest positive impact on the accuracy of wind forecasts in the 0- to 6-hour look-ahead periods for the two regions and to establish a higher level of confidence in ESA-MOOA for mesoscale applications. The detailed methodology and results are provided in separate technical reports listed in the publications section below. Ideally, the data assimilation scheme used in the Phase III experiments would have been based upon an ensemble Kalman filter (EnKF) that was similar to the ESA method used to diagnose the Mid-Columbia Basin sensitivity patterns in the previous studies. However, running an EnKF system at high resolution is impractical because of the very high computational cost. Thus, it was decided to use a three-dimensional variational (3DVAR) analysis scheme that is less computationally intensive. The objective of this task is to develop an observation system deployment strategy for the mid Columbia Basin (i.e. the BPA wind generation region) that is designed to produce the maximum benefit for 1- to 6-hour ahead forecasts of hub-height ({approx}80 m) wind speed with a focus on periods of large changes in wind speed. There are two tasks in the current project effort designed to validate

Hanley, D

2011-10-22T23:59:59.000Z

40

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Idaho Water Rental Pilot Project Probability/Coordination Study Resident Fish and Wildlife Impacts Phase III, 1997 Annual Report.  

SciTech Connect (OSTI)

Phase III began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River Basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water.

Leitzinger, Eric J. (Idaho Department of Fish and Game, Boise, ID)

1998-10-01T23:59:59.000Z

42

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: ÂŁ3,500,000 Funding Source: SRIF III Construction Project Programme: Start

43

Idaho Water Rental Pilot Project probability/coordination study resident fish and wildlife impacts, Phase III. Annual report  

SciTech Connect (OSTI)

Phase III began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water. Existing data, in the form of weighted usable area versus flow relationships, were used to estimate habitat changes for white sturgeon (Acipenser transmontanus) and rainbow trout (Oncorhynchus mykiss)in the Snake River between C.J. Strike Dam and Brownlee pool. The increased flows resulted in increased white sturgeon habitat for most life stages. Rainbow trout adult and spawning habitat increased while juvenile and fry habitat generally decreased. Whether or not these short term increases in habitat result in long term benefits to the fish populations has yet to be determined.

Leitzinger, E.

1996-09-01T23:59:59.000Z

44

Idaho Water Rental Pilot Project Probability/Coordination Study Resident Fish and Wildlife Impact Phase III, 1995 Annual Report.  

SciTech Connect (OSTI)

Phase III began in 1995 with the overall goal of quantifying changes in resident fish habitat in the Snake River basin upstream of Brownlee Reservoir resulting from the release of salmon flow augmentation water. Existing data, in the form of weighted usable area versus flow relationships, were used to estimate habitat changes for white sturgeon (Acipenser transmontanus) and rainbow trout (Oncorhynchus mykiss) in the Snake River between C.J. Strike Dam and Brownlee pool. The increased flows resulted in increased white sturgeon habitat for most life stages. Rainbow trout adult and spawning habitat increased while juvenile and fry habitat generally decreased. Whether or not these short term increases in habitat result in long term benefits to the fish populations has yet to be determined.

Leitzinger, Eric J. (Idaho Department of Fish and Game, Boise, ID)

1996-09-01T23:59:59.000Z

45

Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report  

SciTech Connect (OSTI)

The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

Hsu, F.E.

1995-08-01T23:59:59.000Z

46

Distinguished Achievements of a Quarter-Century Operation and a Promising Project Named MK-III in JOYO  

SciTech Connect (OSTI)

The experimental fast reactor JOYO at the O-arai Engineering Center of the Japan Nuclear Cycle Development Institute is the first liquid sodium fast reactor in Japan. The purpose of constructing JOYO was to obtain technical information about liquid-metal fast breeder reactors (LMFBRs) through experience with their design, construction, and operation and to use the reactor as a fast neutron irradiation facility for the development of fuels, materials, and other components required for the LMFBR program. Through design, construction, testing, operation, and maintenance experience, JOYO has contributed much to the LMFBR development program. In addition to providing operating experience, many kinds of irradiation tests have been conducted for the development of fuels and materials under the conditions of higher fast neutron flux and temperature than those in light water reactors. JOYO has been operated successfully for a quarter-century without any serious problem, and this operation demonstrated the safety and reliability of the sodium-cooled fast reactor.The reactor has just been upgraded to the MK-III core to increase irradiation capability for playing a greater role in providing an irradiation field as a fast reactor. Given the worldwide trend of fast reactor shutdowns, JOYO is an increasingly valuable world resource for current and future reactor development.

Maeda, Yukimoto; Aoyama, Takafumi; Odo, Toshihiro; Nakai, Satoru; Suzuki, Soju [Japan Nuclear Cycle Development Institute (Japan)

2005-04-15T23:59:59.000Z

47

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

48

Subsurface Uranium Fate and Transport: Integrated Experiments and Modeling of Coupled Biogeochemical Mechanisms of Nanocrystalline Uraninite Oxidation by Fe(III)-(hydr)oxides - Project Final Report  

SciTech Connect (OSTI)

Subsurface bacteria including sulfate reducing bacteria (SRB) reduce soluble U(VI) to insoluble U(IV) with subsequent precipitation of UO2. We have shown that SRB reduce U(VI) to nanometer-sized UO2 particles (1-5 nm) which are both intra- and extracellular, with UO2 inside the cell likely physically shielded from subsequent oxidation processes. We evaluated the UO2 nanoparticles produced by Desulfovibrio desulfuricans G20 under growth and non-growth conditions in the presence of lactate or pyruvate and sulfate, thiosulfate, or fumarate, using ultrafiltration and HR-TEM. Results showed that a significant mass fraction of bioreduced U (35-60%) existed as a mobile phase when the initial concentration of U(VI) was 160 µM. Further experiments with different initial U(VI) concentrations (25 - 900 ?M) in MTM with PIPES or bicarbonate buffers indicated that aggregation of uraninite depended on the initial concentrations of U(VI) and type of buffer. It is known that under some conditions SRB-mediated UO2 nanocrystals can be reoxidized (and thus remobilized) by Fe(III)-(hydr)oxides, common constituents of soils and sediments. To elucidate the mechanism of UO2 reoxidation by Fe(III) (hydr)oxides, we studied the impact of Fe and U chelating compounds (citrate, NTA, and EDTA) on reoxidation rates. Experiments were conducted in anaerobic batch systems in PIPES buffer. Results showed EDTA significantly accelerated UO2 reoxidation with an initial rate of 9.5?M day-1 for ferrihydrite. In all cases, bicarbonate increased the rate and extent of UO2 reoxidation with ferrihydrite. The highest rate of UO2 reoxidation occurred when the chelator promoted UO2 and Fe(III) (hydr)oxide dissolution as demonstrated with EDTA. When UO2 dissolution did not occur, UO2 reoxidation likely proceeded through an aqueous Fe(III) intermediate as observed for both NTA and citrate. To complement to these laboratory studies, we collected U-bearing samples from a surface seep at the Rifle field site and have measured elevated U concentrations in oxic iron-rich sediments. To translate experimental results into numerical analysis of U fate and transport, a reaction network was developed based on Sani et al. (2004) to simulate U(VI) bioreduction with concomitant UO2 reoxidation in the presence of hematite or ferrihydrite. The reduction phase considers SRB reduction (using lactate) with the reductive dissolution of Fe(III) solids, which is set to be microbially mediated as well as abiotically driven by sulfide. Model results show the oxidation of HS– by Fe(III) directly competes with UO2 reoxidation as Fe(III) oxidizes HS– preferentially over UO2. The majority of Fe reduction is predicted to be abiotic, with ferrihydrite becoming fully consumed by reaction with sulfide. Predicted total dissolved carbonate concentrations from the degradation of lactate are elevated (log(pCO2) ~ –1) and, in the hematite system, yield close to two orders-of-magnitude higher U(VI) concentrations than under initial carbonate concentrations of 3 mM. Modeling of U(VI) bioreduction with concomitant reoxidation of UO2 in the presence of ferrihydrite was also extended to a two-dimensional field-scale groundwater flow and biogeochemically reactive transport model for the South Oyster site in eastern Virginia. This model was developed to simulate the field-scale immobilization and subsequent reoxidation of U by a biologically mediated reaction network.

Peyton, Brent M. [Montana State University; Timothy, Ginn R. [University of California Davis; Sani, Rajesh K. [South Dakota School of Mines and Technology

2013-08-14T23:59:59.000Z

49

NIF Title III engineering plan  

SciTech Connect (OSTI)

The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

Deis, G

1998-06-01T23:59:59.000Z

50

Renewable Energy & Energy Efficiency Projects: Loan Guarantee...  

Broader source: Energy.gov (indexed) [DOE]

Plenary III: Project Finance and Investment Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Valri Lightner, Assistant Director, Technical Division at...

51

Class III Mid-Term Project, "Increasing Heavy Oil Reserves in the Wilmington Oil Field Through Advanced Reservoir Characterization and Thermal Production Technologies"  

SciTech Connect (OSTI)

The overall objective of this project was to increase heavy oil reserves in slope and basin clastic (SBC) reservoirs through the application of advanced reservoir characterization and thermal production technologies. The project involved improving thermal recovery techniques in the Tar Zone of Fault Blocks II-A and V (Tar II-A and Tar V) of the Wilmington Field in Los Angeles County, near Long Beach, California. A primary objective has been to transfer technology that can be applied in other heavy oil formations of the Wilmington Field and other SBC reservoirs, including those under waterflood. The first budget period addressed several producibility problems in the Tar II-A and Tar V thermal recovery operations that are common in SBC reservoirs. A few of the advanced technologies developed include a three-dimensional (3-D) deterministic geologic model, a 3-D deterministic thermal reservoir simulation model to aid in reservoir management and subsequent post-steamflood development work, and a detailed study on the geochemical interactions between the steam and the formation rocks and fluids. State of the art operational work included drilling and performing a pilot steam injection and production project via four new horizontal wells (2 producers and 2 injectors), implementing a hot water alternating steam (WAS) drive pilot in the existing steamflood area to improve thermal efficiency, installing a 2400-foot insulated, subsurface harbor channel crossing to supply steam to an island location, testing a novel alkaline steam completion technique to control well sanding problems, and starting on an advanced reservoir management system through computer-aided access to production and geologic data to integrate reservoir characterization, engineering, monitoring, and evaluation. The second budget period phase (BP2) continued to implement state-of-the-art operational work to optimize thermal recovery processes, improve well drilling and completion practices, and evaluate the geomechanical characteristics of the producing formations. The objectives were to further improve reservoir characterization of the heterogeneous turbidite sands, test the proficiency of the three-dimensional geologic and thermal reservoir simulation models, identify the high permeability thief zones to reduce water breakthrough and cycling, and analyze the nonuniform distribution of the remaining oil in place. This work resulted in the redevelopment of the Tar II-A and Tar V post-steamflood projects by drilling several new wells and converting idle wells to improve injection sweep efficiency and more effectively drain the remaining oil reserves. Reservoir management work included reducing water cuts, maintaining or increasing oil production, and evaluating and minimizing further thermal-related formation compaction. The BP2 project utilized all the tools and knowledge gained throughout the DOE project to maximize recovery of the oil in place.

Scott Hara

2007-03-31T23:59:59.000Z

52

PART III  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002OpticsPeriodical: Volume 5, Issue 32012)J TOC PART III List

53

Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985  

SciTech Connect (OSTI)

This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

Durham, C.O. Jr.; O'Brien, F.D.; Rodgers, R.W. (eds.) [eds.

1985-01-01T23:59:59.000Z

54

THE ACS LCID PROJECT. III. THE STAR FORMATION HISTORY OF THE CETUS dSph GALAXY: A POST-REIONIZATION FOSSIL  

SciTech Connect (OSTI)

We use deep HST/ACS observations to calculate the star formation history (SFH) of the Cetus dwarf spheroidal (dSph) galaxy. Our photometry reaches below the oldest main-sequence turnoffs, which allows us to estimate the age and duration of the main episode of star formation in Cetus. This is well approximated by a single episode that peaked roughly 12 {+-} 0.5 Gyr ago and lasted no longer than about 1.9 {+-} 0.5 Gyr (FWHM). Our solution also suggests that essentially no stars formed in Cetus during the past 8 Gyr. This makes Cetus' SFH comparable to that of the oldest Milky Way dSphs. Given the current isolation of Cetus in the outer fringes of the Local Group, the dominant old population implies that Cetus is a clear outlier in the morphology-Galactocentric distance relation that holds for the majority of the Milky Way dwarf satellites. Our results also show that Cetus continued forming stars until z{approx_equal} 1, long after the universe was reionized, and that there is no clear signature of the epoch of reionization in Cetus' SFH. We briefly discuss the implications of these results for dwarf galaxy evolution models. Finally, we present a comprehensive account of the data reduction and analysis strategy adopted for all galaxies targeted by the LCID (Local Cosmology from Isolated Dwarfs) project. We employ two different photometry codes (DAOPHOT/ALLFRAME and DOLPHOT), three different SFH reconstruction codes (IAC-pop/MinnIAC, MATCH, and COLE), and two stellar evolution libraries (BaSTI and Padova/Girardi), allowing for a detailed assessment of the modeling and observational uncertainties.

Monelli, M.; Hidalgo, S. L.; Aparicio, A.; Gallart, C.; Bernard, E. J.; Drozdovsky, I., E-mail: monelli@iac.e, E-mail: slhidalgo@iac.e [Instituto de Astrofisica de Canarias, La Laguna, Tenerife (Spain)

2010-09-10T23:59:59.000Z

55

Compound and Elemental Analysis At Lightning Dock Geothermal...  

Open Energy Info (EERE)

Resource Evaluation and Definition (GRED) Program administered by DOE-AAO under Cooperative Agreement Number DE-FC07-00AL66977 Notes This project deepened a well and took...

56

Kotzebue Wind Project III | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:Keystone Clean Air JumpMaine. Its FIPSJV JumpJumpKotzebue

57

GRED Studies and Drilling of Americulture State 2, Americulture...  

Open Energy Info (EERE)

and Drilling of Americulture State 2, Americulture Tilapia Farm: Lightning Dock KGRA, Las Animas Valley, New Mexico Jump to: navigation, search OpenEI Reference LibraryAdd to...

58

GRED Studies and Drilling of Americulture State 2, Americulture Tilapia  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6TheoreticalFuelCell Energy IncFOR EGS Home > GroupsGLFarm:

59

GRADUATE STUDENT HANDBOOK Vol. III. Doctor of Engineering Program  

E-Print Network [OSTI]

Candidate 7 3.16 Doctoral Project Work 7 3.17 Application for Graduation 8 3.18 Doctoral Project Defense 8 3.19 Doctoral Project Report Submission 8 3.20 Graduate Assessment 8 APPENDIX 10 Department Forms (CEE) CollegeGRADUATE STUDENT HANDBOOK Vol. III. Doctor of Engineering Program Department of Civil

60

Capital Projects Delivery Procedures Manual  

E-Print Network [OSTI]

1 Capital Projects Delivery Procedures Manual September 4, 2008 Office of the CFO #12;2 Page I of the Capital Budget 11 B. Budget Approval 12 C. Setting Up Capital Projects 13 III. Procedures for Design ­ Office of the Chief Financial Officer Financial Policies and Procedures for the Capital Project Delivery

Alpay, S. Pamir

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

LABORATORY III POTENTIAL ENERGY  

E-Print Network [OSTI]

LABORATORY III POTENTIAL ENERGY Lab III - 1 In previous problems, you have been introduced to the concepts of kinetic energy, which is associated with the motion of an object, and internal energy, which is associated with the internal structure of a system. In this section, you work with another form of energy

Minnesota, University of

62

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

63

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

64

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

65

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

66

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

67

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

68

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

69

The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part II Availability of Flow and Water Quality Data for the Rio Grande Project Area  

E-Print Network [OSTI]

Cruces, NM 88003 (575) 646-4337 i i Acknowledgement This document and the underlying pr oject activities detailed in this report reflect the joint efforts of many people working with the Paso del Norte Watershed Council (PdNWC). The authors... wish to acknowledge and extend our grat itude to the U.S. Army Corps of Engineers for the generous financial support extende d to the PdNWC for development of the Coordinated Water Resources Database and Model Developm ent Project (called Project...

Tillery, Sue; Sheng, Zhuping; King, J. Phillip; Creel, Bobby; Brown, Christopher; Michelsen, Ari; Srinivasan, Raghavan; Granados, Alfredo

2009-01-01T23:59:59.000Z

70

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

71

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

72

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

73

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

74

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

75

Project Plan UC Online Education (UCOE)  

E-Print Network [OSTI]

of Contents I. PROJECT DESCRIPTION II. COST REVENUE MODEL AND FINANCIAL FORECAST III. INCENTIVES1 Project Plan UC Online Education (UCOE) March 24, 2011 Office of the President SUPPORTING CAMPUS AND FACULTY PARTICIPATION IV. RISKS AND RISK MANAGEMENT V. PROJECT ORGANIZATION

Becker, Luann

76

Sustainable Energy Revolving Loan Fund PROJECT APPLICATION  

E-Print Network [OSTI]

1 Sustainable Energy Revolving Loan Fund PROJECT APPLICATION I. Project Administration 1. Project;2 III. Estimated Annual Energy Savings SHOW CALCULATIONS, RATIONALE AND/OR METHODOLOGY Attach additional documentation if needed Estimated Energy Savings Estimated Financial Savings ELECTRICAL ­ Kilowatt hour and

Escher, Christine

77

Silicon materials task of the low cost solar array project (Phase III). Effect of impurities and processing on silicon solar cells. Phase III summary and seventeenth quarterly report, Volume 1: characterization methods for impurities in silicon and impurity effects data base  

SciTech Connect (OSTI)

The object of Phase III of the program has been to investigate the effects of various processes, metal contaminants and contaminant-process interactions on the performance of terrestrial silicon solar cells. The study encompassed a variety of tasks including: (1) a detailed examination of thermal processing effects, such as HCl and POCl/sub 3/ gettering on impurity behavior, (2) completion of the data base and modeling for impurities in n-base silicon, (3) extension of the data base on p-type material to include elements likely to be introduced during the production, refining, or crystal growth of silicon, (4) effects on cell performance on anisotropic impurity distributions in large CZ crystals and silicon webs, and (5) a preliminary assessment of the permanence of the impurity effects. Two major topics are treated: methods to measure and evaluate impurity effects in silicon and comprehensive tabulations of data derived during the study. For example, discussions of deep level spectroscopy, detailed dark I-V measurements, recombination lifetime determination, scanned laser photo-response, and conventional solar cell I-V techniques, as well as descriptions of silicon chemical analysis are included. Considerable data are tabulated on the composition, electrical, and solar cell characteristics of impurity-doped silicon.

Hopkins, R.H.; Davis, J.R.; Rohatgi, A.; Campbell, R.B.; Blais, P.D.; Rai-Choudhury, P.; Stapleton, R.E.; Mollenkopf, H.C.; McCormick, J.R.

1980-01-01T23:59:59.000Z

78

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

79

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

80

III IIU Em Smiii  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0, 1997Environment >7,992000 Short-TermSeptember» ;,III

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Iii;.} An Ann  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. |Endecaheme c-Type| EMSLemployed inIhorIii;.} An

82

Land, Food & Community III LFS 450 -W2009 Term 2  

E-Print Network [OSTI]

the basis for our understanding of, and interaction with, the ecological, economic and social systems Systems at UBC Farm Morgan Reid and Duncan McHugh, LFS Learning Centre #12;2 Land, Food & Community III (3-822-9607 UBC Food System Project Coordinator Sophia Baker-French sophiabakerfrench@yahoo.com Teaching

Farrell, Anthony P.

83

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: ÂŁ500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

84

III. Vacuum PumpsIII. Vacuum Pumps Gas transfer  

E-Print Network [OSTI]

III. Vacuum PumpsIII. Vacuum Pumps Mechanism Gas transfer Gas capture FunctionFunction Roughing (backing, mechanical pumps) Rotary vane Sorption Rotary lobe Scroll ScrewSorption, Rotary lobe, Scroll Phy250-1, 2011, NanoFab16 #12;IIIIII--A. Roughing: Rotary Vane PumpA. Roughing: Rotary Vane Pump (Gas

Liu, Kai

85

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

86

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

87

Climate Change Effects on the Sacramento Basin's Flood Control Projects ANN DENISE FISSEKIS  

E-Print Network [OSTI]

Climate Change Effects on the Sacramento Basin's Flood Control Projects By ANN DENISE FISSEKIS B.......................................................................6 Chapter III. Climate Change................................................................11 models...........................................................20 Climate change data

Lund, Jay R.

88

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: ÂŁ60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

89

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

90

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: ÂŁ1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

91

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base ...

rroames

2010-01-12T23:59:59.000Z

92

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

93

Mammoth Pacific Geothermal Development Projects: Units II and III | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpIncMAKGalway Bay(Held &InformationWindMaliEnergy

94

PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdf More Documents &PORTSFUTUREPPPODepartment of

95

Lamar Wind Energy Project III | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:Keystone Clean AirjoinLakeshore

96

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

97

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied ...

98

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

99

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

100

Bachelor Project StockHome -Web Application  

E-Print Network [OSTI]

Bachelor Project StockHome - Web Application User interface for a financial analysis tool Gilad and assisting us during dark times. Last but not least, I would like to thank my friends who spent those long . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 iii #12;Gilad Geron StockHome - Web Application A Technologies 31 A.1 Ruby

Lanza, Michele

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Phase I Report U.S. DOE GRED II Program | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrangePeru: Energy Resources Jump to:|| Open EnergyI Report

102

Phase I Report, Us Doe Gred Ii Program | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrangePeru: Energy Resources Jump to:|| Open EnergyI

103

Alta III | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergy InformationTuriAlexandriaAlstom Energy SystemsAlta III

104

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

105

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

106

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

107

Salton Sea III Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton Abbey Wind Farm(CTIhinderProject SmartSaltSaltonIII

108

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

109

WCI-III Workshop Recap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlongUpdatesValleyJablonowskiWCI-III Recap Workshop

110

Minco III | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: Energy Resources JumpMicrelBirds JumpMilner Dam WindIII Jump to:

111

Registration List - WCI-III  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST3 AÇORIANONews Media »WCI-III Registration List

112

Study of Celestial Objects with Very High Energy Gamma Rays CANGAROO III  

E-Print Network [OSTI]

), the doppler boosting of secondary gamma-rays is sufficient to produce TeV gamma-rays. Gamma-ray bursts: Fireballs expanding with relativistic speed explain gamma-ray bursts at cosmological distancesStudy of Celestial Objects with Very High Energy Gamma Rays CANGAROO III Project Description

Enomoto, Ryoji

113

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

114

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

115

Chapter III: Modernizing the Electric Grid  

Office of Environmental Management (EM)

34 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 Chapter III: Modernizing the Electric Grid QER Report: Energy Transmission, Storage, and...

116

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

117

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

118

Volume III, Chapter 11 Dusky Canada Goose  

E-Print Network [OSTI]

Volume III, Chapter 11 Dusky Canada Goose #12;TABLE OF CONTENTS 11.0 DUSKY CANADA GOOSE (BRANTA............................................................................................................... 11-20 #12;DUSKY CANADA GOOSE III, 11-1 May 2004 11.0 Dusky Canada Goose (Branta canadensis occidentalis, Baird) 11.1 Introduction The dusky Canada goose (Branta canadensis occidentalis) is a distinctive

119

Volume III, Chapter 3 Pacific Lamprey  

E-Print Network [OSTI]

Volume III, Chapter 3 Pacific Lamprey #12;TABLE OF CONTENTS 3.0 Pacific Lamprey (Lampetra ........................................................................................... 3-13 3.4.8 Ocean & Estuary Conditions................................................................................................................. 3-14 #12;PACIFIC LAMPREY III, 3-1 May 2004 3.0 Pacific Lamprey (Lampetra tridentata) The anadromous

120

Edward W. Wild III Computer Sciences Department  

E-Print Network [OSTI]

Edward W. Wild III Computer Sciences Department University of Wisconsin-Madison 1210 West Dayton languages. #12;Edward W. Wild III 2 Honors Dean's Honored Graduate 2002 · College of Natural Sciences Articles (1) O. L. Mangasarian, J. W. Shavlik and E. W. Wild. Knowledge-Based Kernel Approximation. Journal

Liblit, Ben

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

LABORATORY III ELECTRIC ENERGY AND CAPACITORS  

E-Print Network [OSTI]

ENERGY You have a job in a University research group investigating the effect of solar flaresLABORATORY III ELECTRIC ENERGY AND CAPACITORS Lab III - 1 Our modern society functions in part because we have learned how to manipulate electrical energy. Almost all of our technology involves

Minnesota, University of

122

C3. Project Description 1. Results from Prior NSF Support: Eriksen  

E-Print Network [OSTI]

into Autonomous Gliders for 4-D Measurements of Bio- Optical and Chemical Parameters The project is near the end*). (iii): Rossby-wave drag in the Southern Ocean is the prime mechanism for opposing the wind- stress

123

NWCC Transmission Case Study III  

SciTech Connect (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

124

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

125

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

126

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

127

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

128

The Healy clean coal project: An overview  

SciTech Connect (OSTI)

The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.

Olson, J.B.; McCrohan, D.V. [Alaska Industrial Development and Export Authority, Anchorage, AK (United States)

1997-12-31T23:59:59.000Z

129

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

130

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

131

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

132

Complexation of N4-Tetradentate Ligands with Nd(III) and Am(III)  

SciTech Connect (OSTI)

To improve understanding of aza-complexants in trivalent actinide–lanthanide separations, a series of tetradentate N-donor ligands have been synthesized and their complexation of americium(III) and neodymium(III) investigated by UV–visible spectrophotometry in methanolic solutions. The six pyridine/alkyl amine/imine ligands are N,N0-bis(2-methylpyridyl)-1,2-diaminoethane, N,N0-bis(2-methylpyridyl)-1,3-diaminopropane, trans-N,N-bis(2-pyridylmethyl)-1,2-diaminocyclohexane (BPMDAC), N,N’-bis(2-pyridylmethyl)piperazine, N,N’-bis-[pyridin-2-ylmethylene]ethane-1,2-diamine, and trans-N,Nbis-([pyridin-2-ylmethylene]-cyclohexane-1,2-diamine. Each ligand has two pyridine groups and two aliphatic amine/imine N-donor atoms arranged with different degrees of preorganization and structural backbone rigidity. Conditional stability constants for the complexes of Am(III) and Nd(III) by these ligands establish the selectivity patterns. The overall selectivity of Am(III) over Nd(III) is similar to that reported for the terdentate bis(dialkyltriazinyl)pyridine molecules. The cyclohexane amine derivative (BPMDAC) is the strongest complexant and shows the highest selectivity for Am(III) over Nd(III) while the imines appear to prefer a bridging arrangement between two cations. These results suggest that this series of ligands could be employed to develop an enhanced actinide(III)– lanthanide(III) separation system.

Ogden, Mark D.; Sinkov, Sergey I.; Meier, G. Patrick; Lumetta, Gregg J.; Nash, Kenneth L.

2012-12-06T23:59:59.000Z

133

aspectos atuais iii: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

form of energy Minnesota, University of 9 Speicherring DORIS III DORIS III Betrieb 1999 Physics Websites Summary: -basierte Kontrollsystem inte- griert. Wegen der...

134

Independent Oversight Inspection, Hanford Site, Vol III - August...  

Broader source: Energy.gov (indexed) [DOE]

Site, Vol III - August 2001 Independent Oversight Inspection, Hanford Site, Vol III - August 2001 August 2001 Inspection of Emergency Management at the Hanford Site This report...

135

Waveguide Filter Tutorial Julius O. Smith III  

E-Print Network [OSTI]

Waveguide Filter Tutorial Julius O. Smith III Center for Computer Research in Music and Acoustics was adapted from the conference paper "Waveguide Filter Tutorial," by J.O. Smith, Proceedings

Smith III, Julius Orion

136

WRITTEN TESTIMONY OF RUSSELL F. SMITH III  

E-Print Network [OSTI]

1 WRITTEN TESTIMONY OF RUSSELL F. SMITH III DEPUTY ASSISTANT SECRETARY FOR INTERNATIONAL FISHERIES APRIL 3, 2014 Introduction Good morning Mr. Chairman and Members of the Committee. I am Russell Smith

137

WRITTEN TESTIMONY OF RUSSELL F. SMITH III  

E-Print Network [OSTI]

WRITTEN TESTIMONY OF RUSSELL F. SMITH III DEPUTY ASSISTANT SECRETARY FOR INTERNATIONAL FISHERIES Introduction Good morning Mr. Chairman and Members of the Committee. I am Russell Smith, Deputy Assistant

138

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

139

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

140

A postdevelopmental evaluation of Langford Creek Watershed Project  

E-Print Network [OSTI]

Evaluation of Benefits and Costs Viewpoint of the Analysis 7 8 9 11 III DESCRIPTION OF T?. 'AREA AND THE FLOOD PROBLEM ~ ~ 12 PROCEDURES AND METHODOLOGY ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 24 Determination of Costs Determination of Benefits Comparison of Results... of small watershed projects by providing informa- tion beneficial for planning procedures and tools for project evaluation. Multiple purpose watersheds . (agricultural land and water management; fish, wildlife and recreational development; municipal...

Rico, Luis

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

142

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

143

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

144

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

145

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

146

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

147

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

148

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

149

Coupled Site Characterization and Foundation Analysis Research Project  

E-Print Network [OSTI]

Engineering Department Bronx, New York, U.S.A. March 2000 #12;Coupled Site Characterization and Foundation Engineering Department Bronx, NY 10471-4098 U.S.A. e-mail: #12;iii Coupled SiteCoupled Site Characterization and Foundation Analysis Research Project: Rational Selection

Horvath, John S.

150

Master Thesis Project Task Distribution and Monitoring in  

E-Print Network [OSTI]

measurements provided by the Network Weather Service monitoring system. The availability information is used for their assistance, and I express my gratitude to everyone at Amadeus and KTH who made the project possible. #12;iii Computing......................................................................... 2-5 2.1.2 Programming

Maguire Jr., Gerald Q.

151

Molten-Salt-Based Growth of Group III Nitrides  

DOE Patents [OSTI]

A method for growing Group III nitride materials using a molten halide salt as a solvent to solubilize the Group-III ions and nitride ions that react to form the Group III nitride material. The concentration of at least one of the nitride ion or Group III cation is determined by electrochemical generation of the ions.

Waldrip, Karen E. (Albuquerque, NM); Tsao, Jeffrey Y. (Albuquerque, NM); Kerley, Thomas M. (Albuquerque, NM)

2008-10-14T23:59:59.000Z

152

Sloan Digital Sky Survey III (SDSS-III), Data Release 9, including the Baryon Oscillation Spectroscopic Survey (BOSS)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The Third Sloan Digital Sky Survey (SDSS-III) has issued Data Release 9 (DR9), the first public release of data from the Baryon Oscillation Spectroscopic Survey (BOSS). In this release BOSS, the largest of SDSS-III’s four surveys, provides spectra for 535,995 newly observed galaxies, 102,100 quasars, and 116,474 stars, plus new information about objects in previous Sloan surveys (SDSS-I and II). Spectroscopy yields a wealth of information about astronomical objects including their motion (called redshift and written z), their composition, and sometimes also the density of the gas and other material that lies between them and observers on Earth. The new release lists spectra for galaxies with redshifts up to z = 0.8 (roughly 7 billion light years away) and quasars with redshifts between z = 2.1 and 3.5 (from 10 to 11.5 billion light years away). When BOSS is complete it will have measured 1.5 million galaxies and at least 150,000 quasars, as well as many thousands of stars and other ancillary objects for scientific projects other than BOSS’s main goal. [extracts copied from LBL news release of August 8, 2012

153

Environmental management of water projects  

SciTech Connect (OSTI)

This book is divided in three parts and contains the following: PART I: ENVIRONMENTAL ASSESSMENTS. Environmental conditions for water resource projects. Characteristics of some large scale reservoirs. Biological parameters of the TVA Eurasian watermilfoil management program. Ecological parameters influencing aquatic plant growth. Biological parameters influencing growth and reproduction of hydrilla. PART II: EVALUATION OF SELECTED AQUATIC HERBICIDES. Technical review of the factors affecting 2,4-D for aquatic use. Technical review of the factors affecting endothall for aquatic use. Technical review of factors affecting diquat for aquatic use. Technical review of the factors affecting use of dicamba. Technical review of the factors affecting aquatic use of dichlobenil. PART III: EVALUATION OF VEGETATION MANAGEMENT PROGRAMS. Strategies for aquatic vegetation management. (A) conversion of factors for U.S. and metric units. (B) Glossary of terms. Index.

Gangstad, E.O.; Stanley, R.A.

1987-01-01T23:59:59.000Z

154

COMMUNITY CHOICE AGGREGATION PILOT PROJECT  

E-Print Network [OSTI]

........................................................................................11 3. Energy Efficiency Impacts..........................................................................................11 III. Organizational Structure........................................................................................................12 A. Organizational Overview

155

Doublet III neutral beam power system  

SciTech Connect (OSTI)

The Doublet III neutral beam power system supplies pulsed power to the neutral beam injectors for plasma heating experiments on the Doublet III tokamak. The power supply system is connected to an ion source where the power is converted to an 80 kV, 80A, 0.5 sec beam of hydrogen ions at maximum power output. These energetic ions undergo partial neutralization via charge exchange in the beamline. The energetic neutral hydrogen atoms pass through the Doublet III toroidal and poloidal magnet fields and deposit their energy in the confined plasma. The unneutralized ions are deflected into a water-cooled dump. The entire system is interfaced through the neutral beam computer instrumentation and control system.

Nerem, A.; Beal, J.W.; Colleraine, A.P.; LeVine, F.H.; Pipkins, J.F.; Remsen, D.B. Jr.; Tooker, J.F.; Varga, H.J.; Franck, J.V.

1981-01-01T23:59:59.000Z

156

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

157

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

158

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

159

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

160

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D ...

162

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

163

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

164

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

165

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

166

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

167

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be… (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

168

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

169

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

170

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

171

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

172

UNIVERSIDAD CARLOS III de MADRID Madrid, Spain  

E-Print Network [OSTI]

UNIVERSIDAD CARLOS III de MADRID Madrid, Spain College of Charleston Bilateral Exchange Program Spain and around the world. It programs in Business Ad- ministration, Economics and Law are ranked among the best in Spain. While studying at UC3M, students are able to partake of the vibrant culture of Madrid

Young, Paul Thomas

173

PHYSICS (Div. III) Chair: Professor KEVIN JONES  

E-Print Network [OSTI]

1 PHYSICS (Div. III) Chair: Professor KEVIN JONES Professors: AALBERTS, S. BOLTON*, K. JONES a laser work? What is a black hole? What are the fundamental building blocks of the universe? Physics majors and Astrophysics majors study these and related questions to understand the physical world around

Aalberts, Daniel P.

174

Photodetectors using III-V nitrides  

DOE Patents [OSTI]

A bandpass photodetector using a III-V nitride and having predetermined electrical properties. The bandpass photodetector detects electromagnetic radiation between a lower transition wavelength and an upper transition wavelength. That detector comprises two low pass photodetectors. The response of the two low pass photodetectors is subtracted to yield a response signal.

Moustakas, Theodore D. (Dover, MA)

1998-01-01T23:59:59.000Z

175

Edgy Science III: From NSF Physics Frontier  

E-Print Network [OSTI]

Edgy Science III: From NSF Physics Frontier Centers NSTA 2010 Philadelphia, PA From brains to the Big Bang, take a crash course in forefront science with the NSF Physics Frontier Centers, including - National Science Foundation (NSF) Physics Frontier Centers (PFCs) · Each Center - Science News - Resources

Collar, Juan I.

176

Retrieval of ozone and nitrogen dioxide concentrations from Stratospheric Aerosol and Gas Experiment III (SAGE III)  

E-Print Network [OSTI]

Retrieval of ozone and nitrogen dioxide concentrations from Stratospheric Aerosol and Gas extinction. We retrieve ozone and nitrogen dioxide number densities and aerosol extinction from transmission), Retrieval of ozone and nitrogen dioxide concentrations from Stratospheric Aerosol and Gas Experiment III

177

Dust in the Ionized Medium of the Galaxy: GHRS Measurements of Al III and S III  

E-Print Network [OSTI]

We present interstellar absorption line measurements of the ions S III and Al III towards six stars using archival Goddard High Resolution Spectrograph data. The ions Al III and S III trace heavily depleted and non-depleted elements, respectively, in ionized gas. We use the photoionization code CLOUDY to derive the ionization correction relating N(Al III)/N(S III) to the gas-phase abundance [Al/S]_i in the ionized gas. For spectral types considered here, the corrections are small and independent of the assumed ionization parameter. Using the results of these photoionization models, we find [Al/S]_i = -1.0 in the ionized gas towards three disk stars. These values of [Al/S]_i (=[Al/H]_i) imply that Al-bearing grains are present in the ionized nebulae around these stars. If the WIM of the Galaxy is photoionized by OB stars, our data for two halo stars imply [Al/S]_i = -0.4 to -0.5 in the WIM and thus the presence of dust grains containing Al in this important phase of the ISM. While photoionization appears to be the most likely origin of the ionization for Al III and S III, we cannot rule out confusion from the presence of hot, collisionally ionized gas along two sightlines. We find that [Al/S]_i in the ionized gas along the six sightlines is anti-correlated with the electron density and average sightline neutral density. The degree of grain destruction in the ionized medium of the Galaxy is not much higher than in the warm neutral medium. The existence of grains in the ionized regions studied here has important implications for the thermal balance of these regions. (Abstract Abridged)

J. Christopher Howk; Blair D. Savage

1998-10-27T23:59:59.000Z

178

Ultracomputer Research Project  

SciTech Connect (OSTI)

This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

Gottlieb, A.

1992-10-01T23:59:59.000Z

179

PROJECT BOEING SGS  

SciTech Connect (OSTI)

Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include: • Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection • Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event • Improved malware detection and zero-day threat response capability • Improved ability to systematically evaluate and secure in house and vendor sourced software applications • Improved ability to continuously monitor and maintain secure configuration of network devices resulting in reduced vulnerabilities for potential exploitation • Improved overall cyber security situational awareness through the integration of multiple discrete security technologies into a single cyber security reporting console • Improved ability to maintain the resiliency of critical systems in the face of a targeted cyber attack of other significant event • Improved ability to model complex networks for penetration testing and advanced training of cyber security personnel

Bell, Thomas

2014-12-31T23:59:59.000Z

180

Evaluation of Project Achievements in VOMARE -project.  

E-Print Network [OSTI]

??The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation… (more)

Kokkarinen, Eeva

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

182

Removal of hazardous anions from aqueous solutions by La(III)- and Y(III)-impregnated alumina  

SciTech Connect (OSTI)

New adsorbents, La(III)- and Y(III)-impregnated alumina, were prepared for the removal of hazardous anions from aqueous solutions. A commercially available alumina was impregnated with La(III) or Y(III) ions by the adsorption process. The change in the surface charge due to the impregnation was measured by acid/base titration. The adsorption rate and the capacity of the alumina for La(III) and Y(III) ions were determined. The adsorption characteristics of the La(III)- and Y(III)-impregnated alumina and the original alumina for fluoride, phosphate, arsenate and selenite ions were analyzed under various conditions. The pH effect, dose effect, and kinetics were studied. The removal selectivity by the impregnated alumina was in the order fluoride > phosphate > arsenate > selenite. The impregnated alumina has been successfully applied for the removal of hazardous anions from synthetic and high-tech industrial wastewaters.

Wasay, Syed Abdul; Tokunaga, Shuzo [National Inst. of Materials and Chemical Research, Ibaraka (Japan); Park, S.W. [Keimyung Univ., Daegu City (Korea, Democratic People`s Republic of)

1996-06-01T23:59:59.000Z

183

Solar Neutrino Measurement at SK-III  

E-Print Network [OSTI]

The full Super-Kamiokande-III data-taking period, which ran from August of 2006 through August of 2008, yielded 298 live days worth of solar neutrino data with a lower total energy threshold of 4.5 MeV. During this period we made many improvements to the experiment's hardware and software, with particular emphasis on its water purification system and Monte Carlo simulations. As a result of these efforts, we have significantly reduced the low energy backgrounds as compared to earlier periods of detector operation, cut the systematic errors by nearly a factor of two, and achieved a 4.5 MeV energy threshold for the solar neutrino analysis. In this presentation, I will present the preliminary SK-III solar neutrino measurement results.

The Super-Kamiokande Collaboration; :; B. S. Yang

2009-10-17T23:59:59.000Z

184

MAVIS III -- A Windows 95/NT Upgrade  

SciTech Connect (OSTI)

MAVIS (Modeling and Analysis of Explosive Valve Interactions) is a computer program that simulates operation of explosively actuated valve. MAVIS was originally written in Fortran in the mid 1970`s and was primarily run on the Sandia Vax computers in use through the early 1990`s. During the mid to late 1980`s MAVIS was upgraded to include the effects of plastic deformation and it became MAVIS II. When the Vax computers were retired, the Gas Transfer System (GTS) Development Department ported the code to the Macintosh and PC platforms, where it ran as a simple console application. All graphical output was lost during these ports. GTS code developers recently completed an upgrade that provides a Windows 95/NT MAVIS application and restores all of the original graphical output. This upgrade is called MAVIS III version 1.0. This report serves both as a user`s manual for MAVIS III v 1.0 and as a general software development reference.

Hardwick, M.F. [Sandia National Labs., Livermore, CA (United States). GTS Engineering Dept.

1997-12-01T23:59:59.000Z

185

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

186

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

187

Analisis Numerico III Curso Codigo 525442  

E-Print Network [OSTI]

An´alisis Num´erico III Apuntes Curso C´odigo 525442 Segundo Semestre 2011 Dr. Raimund B.3.1. M´etodos de disparo para problemas lineales 52 3.3.2. M´etodo de disparo num´erico para problemas´isticas num´ericos 74 5.2.1. M´etodo de caracter´isticas aproximado 74 5.2.2. M´etodo predictor-corrector 75 5

Bürger, Raimund

188

The Formation of Population III Binaries  

E-Print Network [OSTI]

We explore the possibility for the formation of Population III binaries. The collapse of a rotating cylinder is simulated with a three-dimensional, high-resolution nested grid, assuming the thermal history of primordial gas. The simulations are done with dimensionless units, and the results are applicable to low-mass as well as massive systems by scaling with the initial density. We find that if the initial angular momentum is as small as $\\beta \\approx 0.1$, where $\\beta$ is the ratio of centrifugal force to pressure force, then the runaway collapse of the cloud stops to form a rotationally-supported disk. After the accretion of the envelope, the disk undergoes a ring instability, eventually fragmenting into a binary. If the initial angular momentum is relatively large, a bar-type instability arises, resulting in the collapse into a single star through rapid angular momentum transfer. The present results show that a significant fraction of Pop III stars are expected to form in binary systems, even if they are quite massive or less massive. The cosmological implications of Population III binaries are briefly discussed.

Kazuya Saigo; Tomoaki Matsumoto; Masayuki Umemura

2004-10-29T23:59:59.000Z

189

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

190

Project Description: page 1 Project Description  

E-Print Network [OSTI]

Project Description: page 1 Project Description I. Introduction: Josephson junction networks Over the past 25 years, superconducting Josephson junctions have gradually become one of the major topics standards. Our research uses Josephson junctions as model systems for problems in nonlinear and neural

Segall, Ken

191

Livingston Campus Geothermal Project The Project  

E-Print Network [OSTI]

Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

Delgado, Mauricio

192

DOE High Performance Concentrator PV Project  

SciTech Connect (OSTI)

Much in demand are next-generation photovoltaic (PV) technologies that can be used economically to make a large-scale impact on world electricity production. The U.S. Department of Energy (DOE) initiated the High-Performance Photovoltaic (HiPerf PV) Project to substantially increase the viability of PV for cost-competitive applications so that PV can contribute significantly to both our energy supply and environment. To accomplish such results, the National Center for Photovoltaics (NCPV) directs in-house and subcontracted research in high-performance polycrystalline thin-film and multijunction concentrator devices with the goal of enabling progress of high-efficiency technologies toward commercial-prototype products. We will describe the details of the subcontractor and in-house progress in exploring and accelerating pathways of III-V multijunction concentrator solar cells and systems toward their long-term goals. By 2020, we anticipate that this project will have demonstrated 33% system efficiency and a system price of $1.00/Wp for concentrator PV systems using III-V multijunction solar cells with efficiencies over 41%.

McConnell, R.; Symko-Davies, M.

2005-08-01T23:59:59.000Z

193

A comparison of perceived effectiveness of technology projects from viewpoints of external nongovernmental organizations and host country beneficiaries in Haiti  

E-Print Network [OSTI]

of the Study. Objectives. . . . . Theoretical Base Hypothesis. Delimitations. Limitations. Basic Assumptions. . II REVIEW OF LITERATURE. . . . . 1 3 3 3 6 6 6 7 III METHOD OF INVESTIGATION. 12 Sample Selection. Sampling Method. . Instrument..., Catholic Relief Services, and others initiate projects as "donors" within "host countries. " Many of these organizations are nongovernmental organizations (NGOs). They undertake these projects with the intent of fulfilling various aspects...

May, Donald Ray

1998-01-01T23:59:59.000Z

194

Proteome of Geobacter sulfurreducens grown with Fe(III) oxide or Fe(III) citrate as the electron acceptor.  

SciTech Connect (OSTI)

e(III) oxides are the most abundant source of reducible Fe(III) by microorganisms in most soils and sediments, yet few studies on the physiology of Fe(III)-reducing microorganisms during growth on Fe(III) oxide have been conducted because of the technical difficulties in working with cell growth and harvest in the presence of Fe(III) oxides. Geobacter sulfurreducens is a representative of the Geobacter species that predominate in a variety of subsurface environments in which Fe(III) oxide is important. In order to better understand the physiology of Geobacter species during growth on Fe(III) oxide, the proteome of G. sulfurreducens grown on Fe(III) oxide was compared with the proteome of cells grown with soluble Fe(III) citrate. Two-dimensional polyacrylamide gel electrophoresis (2-D PAGE) revealed 19 proteins that were more abundant during growth on Fe(III) oxide than on soluble Fe(III). These included proteins related to protein synthesis, electron transfer and energy production, oxidative stress, protein folding, outer membrane proteins, nitrogen metabolism and hypothetical proteins. Further analysis of the proteome with the accurate mass and time (AMT) tag method revealed additional proteins associated with growth on Fe(III) oxide. These included the outer-membrane c-type cytochrome, OmcS and OmcG, which genetic studies have suggested are required for Fe(III) oxide reduction. Furthermore, several other cytochromes, as yet unstudied, were detected to be significantly up regulated during growth on Fe(III) oxide and other proteins of unknown function were more abundant during growth on Fe(III) oxide than on soluble Fe(III). PilA, the structural protein for pili, which is required for Fe(III) oxide reduction, and other pilin-associated proteins were also more abundant during growth on Fe(III) oxide. Confirmation of the differential expression of proteins known to be important in Fe(III) oxide reduction was observed, and an additional number of previously unidentified proteins were found with significant abundance in the cells grown under conditions of Fe(III) oxide reduction.

Ding, Y-H R.; Hixson, Kim K.; Aklujkar, Ma; Lipton, Mary S.; Smith, Richard D.; Lovley, Derek R.; Mester, Tunde

2008-12-01T23:59:59.000Z

195

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

196

Contract/Project Management  

Energy Savers [EERE]

on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

197

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

198

The 4-H Project  

E-Print Network [OSTI]

As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

199

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

200

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

202

Page 1 of 26 INDEPENDENT PROJECT  

E-Print Network [OSTI]

Page 1 of 26 INDEPENDENT PROJECT EVALUATION PROJECT NAME: HIVE PROOF-OF- CONCEPT PROJECT PROJECT ............................................................................................................................................3 The Project..............................................................................................................................................3 Project Objectives and Achievements

Evans, Paul

203

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

204

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

205

WIPP Projects Interative Map  

Broader source: Energy.gov [DOE]

View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

206

GHPsRUS Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

207

GHPsRUS Project  

SciTech Connect (OSTI)

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

208

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

: BEVATRON Bldg. #: 51 Affected Area: Lot I (6) Lower Lot (52) Dates: 6/2009 - 11/2011 Project: Seismic PhaseProject: BELLA Bldg. #: 71 Affected Area: Lot M-1(12) B81 (18) Dates: 10/2010 ­ 10/2011 Project II Bldg. #: 74 Affected Area: U1 (50) U3 (21) Dates: 10/2009 ­ 4/2012 Project: Old Town Demo Bldg

209

An economic evaluation of the Green Creek Watershed Project  

E-Print Network [OSTI]

can never be given their true value. TABLE OF CONTENTS Chapter Page INTRODUCTION Statement of the Problem Purpose of the Study Objectives II. BENEFIT-COST ANALYSIS III DESCRIPTION OF THE AREA AND THE FLOOD PROBLEH IV. PROCEDURE AND NETEODOLOGY...: DISCOUNTING PROCEDURES 64 74 VITA LlST CF TABLES Table Page Completion Schedule of Flood Water Retarding Structures 17 Design Features of Flood Mater Retarding Structures Green Creek Watershed Project 18 3. Rainfall Record - Green Creek Watershed...

Gray, Roy Mack

2012-06-07T23:59:59.000Z

210

Advanced Experimental Analysis of Controls on Microbial Fe(III) Oxide Reduction - Final Report - 09/16/1996 - 03/16/2001  

SciTech Connect (OSTI)

Considering the broad influence that microbial Fe(III) oxide reduction can have on subsurface metal/organic contaminant biogeochemistry, understanding the mechanisms that control this process is critical for predicting the behavior and fate of these contaminants in anaerobic subsurface environments. Knowledge of the factors that influence the rates of growth and activity of Fe(III) oxide-reducing bacteria is critical for predicting (i.e., modeling) the long-term influence of these organisms on the fate of contaminants in the subsurface, and for effectively utilizing Fe(III) oxide reduction and associated geochemical affects for the purpose of subsurface metal/organic contamination bioremediation. This research project will refine existing models for microbiological and geochemical controls on Fe(III) oxide reduction, using laboratory reactor systems that mimic, to varying degrees, the physical and chemical conditions of the subsurface. Novel experimental methods for studying the kinetics of microbial Fe(III) oxide reduction and measuring growth rates of Fe(III) oxide-reducing bacteria will be developed. These new methodologies will be directly applicable to studies on subsurface contaminant transformations directly coupled to or influenced by microbial Fe(III) oxide reduction.

Roden, Eric E.

2001-03-16T23:59:59.000Z

211

Fundamental Aeronautics Hypersonics Project  

E-Print Network [OSTI]

Fundamental Aeronautics Hypersonics Project Reference Document Principal Investigator: James and detailed content of a comprehensive Fundamental Aeronautics Hypersonics research project. It contains) Hypersonic Project is based on the fact that all access to earth or planetary orbit, and all entry into earth

212

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

213

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

214

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

215

New Project Opportunities  

E-Print Network [OSTI]

/year. Most projects will be sponsored by between four and ten companies. The cost of participation may changeNew Project Opportunities PIMS: Porphyry Indicator Minerals The characteristics and relative, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps

Michelson, David G.

216

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

217

Soy-Based, Water-Cooled, TC W-III Two Cycle Engine Oil  

SciTech Connect (OSTI)

The objective of this project was to achieve technical approval and commercial launch for a biodegradable soy oil-based, environmentally safe, TC W-III performance, water-cooled, two cycle engine oil. To do so would: (1) develop a new use for RBD soybean oil; (2) increase soybean utilization in North America in the range of 500 K-3.0 MM bushels; and (3) open up supply opportunities of 1.5-5.0 MM bushels worldwide. These goals have been successfully obtained.

Scharf, Curtis R.; Miller, Mark E.

2003-08-30T23:59:59.000Z

218

Conversion system overview assessment. Volume III. Solar thermal/coal or biomass derived fuels  

SciTech Connect (OSTI)

The three volumes of this report cover three distinct areas of solar energy research: solar thermoelectrics, solar-wind hybrid systems, and synthetic fuels derived with solar thermal energy. Volume III deals with the conversion of synthetic fuels with solar thermal heat. The method is a hybrid combination of solar energy with either coal or biomass. A preliminary assessment of this technology is made by calculating the cost of fuel produced as a function of the cost of coal and biomass. It is shown that within the projected ranges of coal, biomass, and solar thermal costs, there are conditions when solar synthetic fuels with solar thermal heat will become cost-competitive.

Copeland, R. J.

1980-02-01T23:59:59.000Z

219

Product Guide Project Standard and Project Professional  

E-Print Network [OSTI]

................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

Narasayya, Vivek

220

Project Overload in Project Based Organizations - Causes, Symptoms and Effects.  

E-Print Network [OSTI]

?? This study investigates the matter of project overload which project members have to face in project based organizations. The thesis is based on 13… (more)

Hochdorfer, Tobias

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

III Festival del Siglo de Oro (Chamizal)  

E-Print Network [OSTI]

SPRING 1978 111 III Festival del Siglo de Oro (Chamizal) E. JARABA-PARDO El Siglo de Oro fue, por la fecundidad de los autores y por las influencias trascendentales de sus obras en el posterior desarrollo de la dramaturgia universal, uno de los... todos los actos de los hombres son guiados por Dios, quien se muestra como supremo hacedor de todo cuanto acontece a las criaturas. Se encuentran, pues, en síntesis en el teatro del Siglo de Oro unos valores particularmente antagónicos de la sociedad...

Jaraba-Pardo, E.

1978-04-01T23:59:59.000Z

222

Apollo Energy III LLC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300Algoil JumpAltergyExperimentsInformationAnuvu IncSolarIII LLC Jump to:

223

Steamboat III Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g GrantAtlas (PACA RegionSpringviewNameGeothermal FacilitySteamboat III

224

Altech III (a) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergy InformationTuriAlexandriaAlstom EnergyEnergy Wind Farm JumpIII

225

RSF Workshop Session III: Cost Considerations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298, and 323 RS-PO-0001-001.doc RadiationI: EnergyIII:

226

Glenrock III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to: navigation,GigaCrete Inc JumpGland,Glenrock III Wind Farm Jump

227

Dynamic Updating Procedures in the ASM for the RCA III Hong-Il Lim, William Nayda, Bruce McCarl and Jay Atwood  

E-Print Network [OSTI]

of primary corn demand. Corn can also be wetmilled into starch, ethanol, corn oil, and corn syrup production and demand growth for use in the Agricultural Sector Model (ASM). The purpose of this procedure is to forecast demand and production in the future as part of the RCA III project. These parameters were

McCarl, Bruce A.

228

Ukraine Kievenergo district heating project. Volume 1. Export trade information  

SciTech Connect (OSTI)

This study, conducted by Joseph Technolgoy Corporation, was funded by the U.S. Trade and Development Agency. The purpose of this study was directed toward increasing the heat capacity, reducing fuel costs and import requirements, bringing about energy efficiency in the Kiev District Heating (DH) system; improving environmental conditions in affected areas; and supporting the strengthening and restructuring of Kiev, DH institutions and development of the DH sector. The report lists project risks and offers recommendations to minimize these risks. Also included are detailed cost estimates and financial analyses. The report is divided into the following sections: (1) Acknowledgement, (2) Project Summary, (3) Abbreviations, (4) I. Sector Background and Objectives, (5) II. The Project, (6) III. Implementing Agencies, (7) IV. Financial Aspects, (8) V. Project Benefits and Risks, (9) VI. Agreements to be Reached and Recommendations, (10) Annexes.

NONE

1997-04-01T23:59:59.000Z

229

Renewable Energy Project Refinement Webinar  

Broader source: Energy.gov [DOE]

Attendees will become familiar with the three components of project refinement: project financing strategies, off-taker agreements, and vendor selection. Project refinement obstacles, particularly...

230

RENOTER Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RENOTER Project RENOTER Project Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE...

231

Sloan Digital Sky Survey III (SDSS-III), Data Release 8  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Building on the legacy of the Sloan Digital Sky Survey (SDSS) and SDSS-II, the SDSS-III Collaboration is working to map the Milky Way, search for extrasolar planets, and solve the mystery of dark energy. SDSS-III's first release, Data Release 8 (DR8), became available in the first half of 2012. DR8 contains all the images ever taken by the SDSS telescope. Together, these images make up the largest color image of the sky ever made. A version of the DR8 image is shown to the right. DR8 also includes measurements for nearly 500 million stars, galaxies, and quasars, and spectra for nearly two million. All of DR8's images, spectra, and measurements are available to anyone online. You can browse through sky images, look up data for individual objects, or search for objects anywhere using any criteria. SDSS-III will collect data from 2008 to 2014, using the 2.5-meter telescope at Apache Point Observatory. SDSS-III consists of four surveys, each focused on a different scientific theme. These four surveys are: 1) Baryon Oscillation Spectroscopic Survey (BOSS); 2) SEGUE-2 (Sloan Extension for Galactic Understanding and Exploration); 3) The APO Galactic Evolution Experiment (APOGEE); and 4) The Multi-object APO Radial Velocity Exoplanet Large-area Survey (MARVELS). [Copied with edits from http://www.sdss3.org/index.php

232

The Formation of Population III Binaries  

E-Print Network [OSTI]

We explore the possibility for the formation of Population III binaries. The collapse of a rotating cylinder is simulated with a three-dimensional, high-resolution nested grid, assuming the thermal history of primordial gas. The simulations are done with dimensionless units, and the results are applicable to low-mass as well as massive systems by scaling with the initial density. We find that if the initial angular momentum is as small as $\\beta \\approx 0.1$, where $\\beta$ is the ratio of centrifugal force to pressure force, then the runaway collapse of the cloud stops to form a rotationally-supported disk. After the accretion of the envelope, the disk undergoes a ring instability, eventually fragmenting into a binary. If the initial angular momentum is relatively large, a bar-type instability arises, resulting in the collapse into a single star through rapid angular momentum transfer. The present results show that a significant fraction of Pop III stars are expected to form in binary systems, even if they ar...

Saigo, K; Umemura, M; Saigo, Kazuya; Matsumoto, Tomoaki; Umemura, Masayuki

2004-01-01T23:59:59.000Z

233

ARIES-III divertor engineering design  

SciTech Connect (OSTI)

This paper reports the engineering design of the ARIES-III double- null divertor. The divertor coolant tubes are made from W-3Re alloy and cooled by subcooled flow boiling of organic coolant. A coating of 4 mm thick tungsten is plasma sprayed onto the divertor surface. This W layer can withstand the thermal deposition of a few disruptions. At a maximum surface heat flux of 5.4 MW/m{sup 2}, a conventional divertor design can be used. The divertor surface is contoured to have a constant heat flux of 5.4 MW/m{sup 2}. The net erosion of the W-surface was found to be negligible at about 0.1 mm/year. After 3 years of operation, the W-3Re alloy ARIES-III divertor can be disposed of as Class A waste. In order to control the prompt dose release at site boundary to less than 200 Rem, isotopic tailoring of the W-alloy will be needed.

Wong, C.P.C.; Schultz, K.R. [General Atomics, San Diego, CA (United States); Cheng, E.T. [TSI Research, Solana Beach, CA (United States); Grotz, S.; Hasan, M.A.; Najmabadi, F.; Sharafat, S. [California Univ., Los Angeles, CA (United States). Dept. of Mechanical, Aerospace and Nuclear Engineering; Brooks, J.N.; Ehst, D.A.; Sze, D.K. [Argonne National Lab., IL (United States); Herring, J.S. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Valenti, M.; Steiner, D. [Rensselaer Polytechnic Inst., Troy, NY (United States). Plasma Dynamics Lab.

1992-01-01T23:59:59.000Z

234

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

235

National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT  

E-Print Network [OSTI]

National Compact Stellarator Experiment Project Closeout Report i PROJECT CLOSEOUT REPORT NATIONAL of Science Princeton Plasma Physics Laboratory Oak Ridge National Laboratory #12;National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT NATIONAL COMPACT STELLARATOR EXPERIMENT (NCSX

Princeton Plasma Physics Laboratory

236

The Decovalex III Project: A Summary of Activities and Lessons Learned  

E-Print Network [OSTI]

Energy of Canada, Ltd (AECL). , Canada Swedish Nuclear Fuelin this task were OPG/AECL, SKB/CTH, STUK/HUT, and UEDIN.state boundary conditions (AECL and CTH). 2. Phase II: 3D

Tsang, Chin-Fu; Jing, Lanru; Stephansson, Ove; Kautsky, Fritz

2005-01-01T23:59:59.000Z

237

Department of Chemistry: Part III Projects 2013/14 Dr Alex Thom  

E-Print Network [OSTI]

. by Gill et al. to derive a new functional based on the energies of finite spherical electron gases2 the behaviour of and designing new methods to calculate the electronic structure of molecules. In particular understanding where and why existing methods fail tells us a lot about how to design new, better methods

Alavi, Ali

238

Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase Iii: Impacts Analysis Results  

E-Print Network [OSTI]

for this study. retail price of gasoline was set at $1.45Inuut Data 1.45 Retail price of gasoline, $/gallon, taxesof retail gasoline initial vehicle cost. prices, overall

Scag; Path

1993-01-01T23:59:59.000Z

239

THE BROWN DWARF KINEMATICS PROJECT (BDKP). III. PARALLAXES FOR 70 ULTRACOOL DWARFS  

SciTech Connect (OSTI)

We report parallax measurements for 70 ultracool dwarfs (UCDs) including 11 late-M, 32 L, and 27 T dwarfs. In this sample, 14 M and L dwarfs exhibit low surface gravity features, 6 are close binary systems, and 2 are metal-poor subdwarfs. We combined our new measurements with 114 previously published UCD parallaxes and optical-mid-IR photometry to examine trends in spectral-type/absolute magnitude, and color-color diagrams. We report new polynomial relations between spectral type and M{sub JHK}. Including resolved L/T transition binaries in the relations, we find no reason to differentiate between a 'bright' (unresolved binary) and a 'faint' (single source) sample across the L/T boundary. Isolating early T dwarfs, we find that the brightening of T0-T4 sources is prominent in M{sub J} where there is a [1.2-1.4] mag difference. A similar yet dampened brightening of [0.3-0.5] mag happens at M{sub H} and a plateau or dimming of [-0.2 to -0.3] mag is seen in M{sub K} . Comparison with evolutionary models that vary gravity, metallicity, and cloud thickness verifies that for L into T dwarfs, decreasing cloud thickness reproduces brown dwarf near-IR color-magnitude diagrams. However we find that a near constant temperature of 1200 {+-}100 K along a narrow spectral subtype of T0-T4 is required to account for the brightening and color-magnitude diagram of the L-dwarf/T-dwarf transition. There is a significant population of both L and T dwarfs which are red or potentially 'ultra-cloudy' compared to the models, many of which are known to be young indicating a correlation between enhanced photospheric dust and youth. For the low surface gravity or young companion L dwarfs we find that 8 out of 10 are at least [0.2-1.0] mag underluminous in M{sub JH} and/or M{sub K} compared to equivalent spectral type objects. We speculate that this is a consequence of increased dust opacity and conclude that low surface gravity L dwarfs require a completely new spectral-type/absolute magnitude polynomial for analysis.

Faherty, Jacqueline K.; Shara, Michael M.; Cruz, Kelle L. [Department of Astrophysics, American Museum of Natural History, Central Park West at 79th Street, New York, NY 10034 (United States); Burgasser, Adam J. [Center of Astrophysics and Space Sciences, Department of Physics, University of California, San Diego, CA 92093 (United States); Walter, Frederick M. [Department of Physics and Astronomy, Stony Brook University, Stony Brook, NY 11794-3800 (United States); Van der Bliek, Nicole [CTIO/National Optical Astronomy Observatory (Chile); West, Andrew A. [Department of Astronomy, Boston University, 725 Commonwealth Ave Boston, MA 02215 (United States); Vrba, Frederick J. [US Naval Observatory, Flagstaff Station, P.O. Box 1149, Flagstaff, AZ 86002 (United States); Anglada-Escude, Guillem, E-mail: jfaherty@amnh.org [Department of Terrestrial Magnetism, Carnegie Institution of Washington 5241 Broad Branch Road, NW, Washington, DC 20015 (United States)

2012-06-10T23:59:59.000Z

240

Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase Iii: Impacts Analysis Results  

E-Print Network [OSTI]

subsidized battery cost scenario, life cycle RPEV costsbattery cost, eliminating fuel taxes for RPEVs and lowering energy costs would additionally improve the RPEV life cycle cost

Scag; Path

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Lattice-Mismatched III-V Epilayers for High-Efficiency Photovoltaics  

SciTech Connect (OSTI)

The project focused on development of new approaches and materials combinations to expand and improve the quality and versatility of lattice-mismatched (LMM) III-V semiconductor epilayers for use in high-efficiency multijunction photovoltaic (PV) devices. To address these goals, new capabilities for materials synthesis and characterization were established at SDSM&T that have applications in modern opto- and nano-electronics, including epitaxial crystal growth and transmission electron microscopy. Advances were made in analyzing and controlling the strain profiles and quality of compositional grades used for these technologies. In particular, quaternary compositional grades were demonstrated, and a quantitative method for characteristic X-ray analysis was developed. The project allowed enhanced collaboration between scientists at NREL and SDSM&T to address closely related research goals, including materials exchange and characterization.

Ahrenkiel, Scott Phillip [South Dakota School of Mines & Technology] [South Dakota School of Mines & Technology

2013-06-30T23:59:59.000Z

242

The role of technology in reducing health care costs. Phase II and phase III.  

SciTech Connect (OSTI)

In Phase I of this project, reported in SAND97-1922, Sandia National Laboratories applied a systems approach to identifying innovative biomedical technologies with the potential to reduce U.S. health care delivery costs while maintaining care quality. The effort provided roadmaps for the development and integration of technology to meet perceived care delivery requirements and an economic analysis model for development of care pathway costs for two conditions: coronary artery disease (CAD) and benign prostatic hypertrophy (BPH). Phases II and III of this project, which are presented in this report, were directed at detailing the parameters of telemedicine that influence care delivery costs and quality. These results were used to identify and field test the communication, interoperability, and security capabilities needed for cost-effective, secure, and reliable health care via telemedicine.

Cilke, John F.; Parks, Raymond C.; Funkhouser, Donald Ray; Tebo, Michael A.; Murphy, Martin D.; Hightower, Marion Michael; Gallagher, Linda K.; Craft, Richard Layne, II; Garcia, Rudy John

2004-04-01T23:59:59.000Z

243

Multijunction III-V Photovoltaics Research | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

coating. DOE invests in multijunction III-V solar cell research to drive down the costs of the materials, manufacturing, tracking techniques, and concentration methods used...

244

Isolation and microbial reduction of Fe(III) phyllosilicates...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

phases, and if possible, Fe(III) oxide phases, from a weathered shale saprolite sediment in order to permit experimentation with each phase in isolation. Physical...

245

III-Nitride Nanowires: Emerging Materials for Lighting and Energy...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

building blocks in LEDs, lasers, sensors, photovoltaics, and high power and high speed electronics. Compared to planar films, III-nitride nanowires have several potential...

246

Iron(III)-doped, silica : biodegradable, self-targeting nanoparticles  

E-Print Network [OSTI]

of calcium and phosphorous, which can be attributed toamount of calcium and phosphorous increase. The iron(III)-composed of calcium and phosphorous were in the recovered

Mitchell, Kristina Kalani Pohaku

2011-01-01T23:59:59.000Z

247

John Hale III Awarded Minority Federal Government Public Servant...  

Office of Environmental Management (EM)

awarded John Hale III, Director of the U.S. Department of Energy's Office of Small Business and disadvantage Utilization, the National Minority Federal Government Public Servant...

248

Total synthesis of Class II and Class III Galbulimima Alkaloids  

E-Print Network [OSTI]

I. Total Synthesis of All Class III Galbulimima Alkaloids We describe the total synthesis of (+)- and (-)-galbulimima alkaloid 13, (-)-himgaline anad (-)-himbadine. The absolute stereochemistry of natural (-)-galbulimima ...

Tjandra, Meiliana

2010-01-01T23:59:59.000Z

249

Toyota Gen III Prius Hybrid Electric Vehicle Accelerated Testing...  

Broader source: Energy.gov (indexed) [DOE]

HEV Accelerated Testing - September 2011 Two model year 2010 Toyota Generation III Prius hybrid electric vehicles (HEVs) entered Accelerated testing during July 2009 in a fleet in...

250

Healy Clean Coal Project: A DOE Assessment  

SciTech Connect (OSTI)

The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict environmental requirements. DOE provided $117,327,000 of the total project cost of $282,300,000, or 41.6 percent. Construction for the demonstration project was started in May 1995, and completed in November 1997. Operations were initiated in January 1998, and completed in December 1999. The evaluation contained herein is based primarily on information from the AIDEA's Final Report (Alaska Industrial Development and Export Authority, 2001), as well as other references cited.

National Energy Technology Laboratory

2003-09-01T23:59:59.000Z

251

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

252

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

253

Battleground Energy Recovery Project  

SciTech Connect (OSTI)

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ď?· Create a Showcase Waste Heat Recovery Demonstration Project.

Daniel Bullock

2011-12-31T23:59:59.000Z

254

Operational Waste Volume Projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

255

Operational waste volume projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

Koreski, G.M.

1996-09-20T23:59:59.000Z

256

Investor Confidence Project  

E-Print Network [OSTI]

projects (under $1MM), Lighter engineering requirements – V1 Released September 2013 • Targeted Commercial – Single Measure or Non-Interactive Retrofits – Release Date Dec 2013 • Multifamily – Release Q1 2014 • Quality Assurance Protocol – Currently in BETA...Environmental Defense Fund’s Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project...

Golden, M.

2013-01-01T23:59:59.000Z

257

Project Finance Case Studies  

Broader source: Energy.gov [DOE]

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

258

Prison Solar Project  

Broader source: Energy.gov [DOE]

Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

259

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

260

Barstow Wind Turbine Project  

Broader source: Energy.gov [DOE]

Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

TThe {\\sc Majorana} Project  

E-Print Network [OSTI]

The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

The MAJORANA collaboration

2009-10-23T23:59:59.000Z

262

Dispersion Modeling Project  

Broader source: Energy.gov (indexed) [DOE]

Dispersion Modeling Project Nuclear & Criticality Safety Engineering Andrew Vincent Germantown, MD DOE Workshop Savannah River Nuclear Solutions, LLC June, 2012 SRNS-...

263

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Greater Seattle and Olympia Metropolitan Areas Vehicle enrollment numbers refer to the EV Project only. Numbers do not reflect total regional or national vehicles sales or...

264

Our Project Regional, community,  

E-Print Network [OSTI]

City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

Minnesota, University of

265

2015 Technology Innovation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

266

The MAJORANA project  

SciTech Connect (OSTI)

The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

Elliott, Steven R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

267

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

268

NAESB BPS ATC Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By Phone * 10114 NAESB BPS ATC Project Kick Off * 107 - 10814 NAESB BPS - MISO (Carmel, IN) * 112515 - NAESB BPS Conference Call * 12215 - NAESB BPS Conference...

269

PROJECT PLANNING TEMPLATE  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on public affairs efforts, which includes public information activities, press and media services, DOE home-page content, speaking engagements, special projects, internal...

270

Gravity Train Project  

E-Print Network [OSTI]

Dec 7, 2013 ... Gravity Train Project. Same page in Romanian, Polish, and in French. Let us drill a straight tunnel from West Lafayette, IN to Paris, France:.

271

Mascoma: Frontier Biorefinery Project  

Broader source: Energy.gov [DOE]

This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

272

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

273

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project. The Master of Science in Enterprise Project Management (MS-EPM) is a 36-credit degree that goes beyond

Yang, Eui-Hyeok

274

Benchmark On Sensitivity Calculation (Phase III)  

SciTech Connect (OSTI)

The sensitivities of the keff eigenvalue to neutron cross sections have become commonly used in similarity studies and as part of the validation algorithm for criticality safety assessments. To test calculations of the sensitivity coefficients, a benchmark study (Phase III) has been established by the OECD-NEA/WPNCS/EG UACSA (Expert Group on Uncertainty Analysis for Criticality Safety Assessment). This paper presents some sensitivity results generated by the benchmark participants using various computational tools based upon different computational methods: SCALE/TSUNAMI-3D and -1D, MONK, APOLLO2-MORET 5, DRAGON-SUSD3D and MMKKENO. The study demonstrates the performance of the tools. It also illustrates how model simplifications impact the sensitivity results and demonstrates the importance of 'implicit' (self-shielding) sensitivities. This work has been a useful step towards verification of the existing and developed sensitivity analysis methods.

Ivanova, Tatiana [IRSN; Laville, Cedric [IRSN; Dyrda, James [Atomic Weapons Establishment; Mennerdahl, Dennis [E. Mennerdahl Systems; Golovko, Yury [Institute of Physics and Power Engineering (IPPE), Obninsk, Russia; Raskach, Kirill [Institute of Physics and Power Engineering (IPPE), Obninsk, Russia; Tsiboulia, Anatoly [Institute of Physics and Power Engineering (IPPE), Obninsk, Russia; Lee, Gil Soo [Korea Institute of Nuclear Safety (KINS); Woo, Sweng-Woong [Korea Institute of Nuclear Safety (KINS); Bidaud, Adrien [Labratoire de Physique Subatomique et de Cosmolo-gie (LPSC); Patel, Amrit [NRC; Bledsoe, Keith C [ORNL; Rearden, Bradley T [ORNL; Gulliford, J. [OECD Nuclear Energy Agency

2012-01-01T23:59:59.000Z

275

SPEAR III: A brighter source at SSRL  

SciTech Connect (OSTI)

By replacing the magnets and vacuum chamber for the 3 GeV SPEAR II storage ring, the natural emittance of the machine can be reduced from 130 to 18 nm-rad and the stored current can be raised from 100 to 200 mA with a 50 h lifetime. This configuration increases focused photon flux for insertion device beamlines by an order of magnitude and the photon brightness for future undulators would exceed 10{sup 18} at 5 keV. Due to a higher critical energy, the photon flux in the 20 keV range for bending magnet beamlines increases by more than two orders of magnitude. We present preliminary SPEAR III design study results and plans to implement the facility upgrade with minimal downtime for SSRL users.

Hettel, R.; Boyce, R.; Brennan, S. [and others

1997-06-02T23:59:59.000Z

276

Neptunium Binding Kinetics with Arsenazo(III)  

SciTech Connect (OSTI)

This document has been prepared to meet FCR&D level 2 milestone M2FT-14IN0304021, “Report on the results of actinide binding kinetics with aqueous phase complexants” This work was carried out under the auspices of the Thermodynamics and Kinetics of Advanced Separations Systems FCR&D work package. The report details kinetics experiments that were performed to measure rates of aqueous phase complexation for pentavalent neptunium with the chromotropic dye Arsenazo III (AAIII). The studies performed were designed to determine how pH, ionic strength and AAIII concentration may affect the rate of the reaction. A brief comparison with hexavalent neptunium is also made. It was identified that as pH was increased the rate of reaction also increased, however increasing the ionic strength and concentration of AAIII had the opposite effect. Interestingly, the rate of reaction of Np(VI) with AAIII was found to be slower than that of the Np(V) reaction.

Leigh R. Martin; Aaron T. Johnson; Stephen P. Mezyk

2014-08-01T23:59:59.000Z

277

Application of Advanced Reservoir Characterization, Simulation, and Production Optimization Strategies to Maximize Recovery in Slope and Basin Clastic Reservoirs, West Texas (Delaware Basin), Class III  

SciTech Connect (OSTI)

The objective of this Class III project was demonstrate that reservoir characterization and enhanced oil recovery (EOR) by CO2 flood can increase production from slope and basin clastic reservoirs in sandstones of the Delaware Mountain Group in the Delaware Basin of West Texas and New Mexico. Phase 1 of the project, reservoir characterization, focused on Geraldine Ford and East Ford fields, which are Delaware Mountain Group fields that produce from the upper Bell Canyon Formation (Ramsey sandstone). The demonstration phase of the project was a CO2 flood conducted in East Ford field, which is operated by Orla Petco, Inc., as the East Ford unit.

Dutton, Shirley P.; Flanders, William A.

2001-11-04T23:59:59.000Z

278

Volume III, Issue 4 your connection  

E-Print Network [OSTI]

, and solar panels. The 87,700 square foot building contains offices, 60 standard laboratories, and 4 percent, contributing toward an overall cost savings of 29 percent. In addition to energy-cost- saving by minimizing the dis- tance materials traveled to the site. The total cost for the project was $66.8 million

279

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

280

APCO Project 25 Wireless Data Services for Smaller Public Safety Agencies  

E-Print Network [OSTI]

APCO Project 25 Wireless Data Services for Smaller Public Safety Agencies Ivan Elhart, W. Thomas Miller III, and Andrew L. Kun University of New Hampshire Dept. of Electrical & Computer Engineering networks combined with other wireless/wired networks have been used for various public services ranging

New Hampshire, University of

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

282

The Home Microbiome Project  

SciTech Connect (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-08-25T23:59:59.000Z

283

The Home Microbiome Project  

ScienceCinema (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-09-15T23:59:59.000Z

284

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

285

Calderon Cokemaking Process/Demonstration Project  

SciTech Connect (OSTI)

This project deals with the demonstration of a coking process using proprietary technology of Calderon with the following objectives in order to enable its commercialization: (i) making coke of such quality as to be suitable for use in high driving (highly productive) blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; and (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process. The activities of the past quarter were entirely focused on operating the Calderon Process Development Unit (PDU-I) in Alliance, Ohio conducting a series of tests under steady state using coal from Bethlehem Steel and U.S. Steel in order to demonstrate the above. The objectives mentioned above were successfully demonstrated.

None

1998-04-08T23:59:59.000Z

286

Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III  

SciTech Connect (OSTI)

The Nash Draw Brushy Canyon Pool (NDP) is southeast New Mexico is one of the nine projects selected in 1995 by the U.S. Department of Energy (DOE) for participation in the Class III Reservoir Field Demonstration Program. The goals of the DOE cost-shared Class Program are to: (1) extend economic production, (2) increase ultimate recovery, and (3) broaden information exchange and technology application. Reservoirs in the Class III Program are focused on slope-basin and deep-basin clastic depositional types.

Murphy, Mark B.

2000-10-25T23:59:59.000Z

287

III-1.10(A) page 1 III-1.10(A) UNIVERSITY OF MARYLAND PROCEDURES FOR SCHOLARLY  

E-Print Network [OSTI]

III-1.10(A) page 1 III-1.10(A) UNIVERSITY OF MARYLAND PROCEDURES FOR SCHOLARLY MISCONDUCT Approved. GENERAL These procedures implement the Board of Regents Policy on Misconduct in Scholarly Work (November 30, 1989). All references to the "University" in these procedures mean the University of Maryland

Shapiro, Benjamin

288

Measuring Project Quality Factors Critical to Project Success  

E-Print Network [OSTI]

Measuring Project Quality ­ Factors Critical to Project Success Presented by Thomas Howe P available to measure and track project cost (cheap) and schedule (fast), the measurement and monitoring of project quality (good) is at best underdeveloped. While qualitative measures of project cost and schedule

Calgary, University of

289

Energy Efficiency Project Development  

SciTech Connect (OSTI)

The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

IUEP

2004-03-01T23:59:59.000Z

290

The human genome project  

SciTech Connect (OSTI)

The Human Genome Project will obtain high-resolution genetic and physical maps of each human chromosome and, somewhat later, of the complete nucleotide sequence of the deoxyribonucleic acid (DNA) in a human cell. The talk will begin with an extended introduction to explain the Project to nonbiologists and to show that map construction and sequence determination require extensive computation in order to determine the correct order of the mapped entities and to provide estimates of uncertainty. Computational analysis of the sequence data will become an increasingly important part of the project, and some computational challenges are described. 5 refs.

Bell, G.I.

1991-06-01T23:59:59.000Z

291

Projects | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergyProjectProjects Projects All 1703

292

Magnetic Fields in Population III Star Formation  

SciTech Connect (OSTI)

We study the buildup of magnetic fields during the formation of Population III star-forming regions, by conducting cosmological simulations from realistic initial conditions and varying the Jeans resolution. To investigate this in detail, we start simulations from identical initial conditions, mandating 16, 32 and 64 zones per Jeans length, and studied the variation in their magnetic field amplification. We find that, while compression results in some amplification, turbulent velocity fluctuations driven by the collapse can further amplify an initially weak seed field via dynamo action, provided there is sufficient numerical resolution to capture vortical motions (we find this requirement to be 64 zones per Jeans length, slightly larger than, but consistent with previous work run with more idealized collapse scenarios). We explore saturation of amplification of the magnetic field, which could potentially become dynamically important in subsequent, fully-resolved calculations. We have also identified a relatively surprising phenomena that is purely hydrodynamic: the higher-resolved simulations possess substantially different characteristics, including higher infall-velocity, increased temperatures inside 1000 AU, and decreased molecular hydrogen content in the innermost region. Furthermore, we find that disk formation is suppressed in higher-resolution calculations, at least at the times that we can follow the calculation. We discuss the effect this may have on the buildup of disks over the accretion history of the first clump to form as well as the potential for gravitational instabilities to develop and induce fragmentation.

Turk, Matthew J.; Oishi, Jeffrey S.; Abel, Tom; Bryan, Greg

2012-02-22T23:59:59.000Z

293

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project  

E-Print Network [OSTI]

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project depending upon the scope, complexity, and specific features. Time periods indicated will vary depending on the nature of the project and needs of the user group

Mather, Patrick T.

294

July 28, 2013 Project Identification  

E-Print Network [OSTI]

://ernd.mosti.gov.my/eScience/Appli/frmApp_App_ProjId... 2 of 2 28/07/2013 14:10 #12;July 28, 2013 Project to expense codes).Only direct project expenses are funded by ScienceFund. Expense Category Year 1 (2010) YearJuly 28, 2013 Project Identification Project Identification Project Objectives Research Background

Bargiela, Andrzej

295

July 28, 2013 Project Identification  

E-Print Network [OSTI]

.gov.my/eScience/Appli/frmApp_App_ProjId... 1 of 1 28/07/2013 14:12 #12;July 28, 2013 Project Cost project expenses are funded by ScienceFund. Expense Category Year 1 (2008) Year 2 (2009) Year 3 (2010July 28, 2013 Project Identification Project Identification Project Objectives Research Background

Bargiela, Andrzej

296

What controls the [O III] 5007 line strength in AGN?  

E-Print Network [OSTI]

AGN display an extreme range in the narrow emission line equivalent widths. Specifically, in the PG quasar sample the equivalent width of the narrow [O III] 5007 line has a range of >300, while the broad Hb line, for example, has a range of 10 only. The strength of [O III] 5007 is modulated by the covering factor, CF, of the narrow line region (NLR) gas, its density n_e, and ionization parameter U. To explore which of these factors produces the observed large range in [O III] 5007 strength, we measure the strength of the matching narrow Hb and [O III] 4363 lines, detected in 40 out of the 87 z<0.5 PG quasars in the Boroson & Green sample. The photoionization code CLOUDY is then used to infer CF, n_e, and U in each object, assuming a single uniform emitting zone. We find that the range of CF (~0.02-0.2) contributes about twice as much as the range in both n_e and U towards modulating the strength of the [O III] 5007 line. The CF is inversely correlated with luminosity, but it is not correlated with L_Edd as previously speculated. The single zone [O III] 5007 emitting region is rather compact, having R=40L_44^0.45 pc. These emission lines can also be fit with an extreme two zone model, where [O III] 4363 is mostly emitted by a dense (n_e=10^7) inner zone at R=L_44^0.5 pc, and [O III] 5007 by a low density (n_e=10^3) extended outer zone at R=750L_44^0.34 pc. Such an extended [O III] 5007 emission should be well resolved by HST imaging of luminous AGN. Further constraints on the radial gas distribution in the NLR can be obtained from the spectral shape of the IR continuum emitted by the associated dust.

Alexei Baskin; Ari Laor

2005-02-22T23:59:59.000Z

297

Contract/Project Management  

Office of Environmental Management (EM)

Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and...

298

Contract/Project Management  

Energy Savers [EERE]

Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

299

Contract/Project Management  

Energy Savers [EERE]

in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

300

Contract/Project Management  

Energy Savers [EERE]

76% This is a 3-year rolling average Data includes FY06 to FY08. (3748) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Offshore Wind Project Map  

Broader source: Energy.gov [DOE]

Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

302

IT Project Manager  

Broader source: Energy.gov [DOE]

This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

303

Healthcare Project Performance Benchmarks  

Broader source: Energy.gov [DOE]

Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the healthcare industry, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

304

Research Project Overview Introduction  

E-Print Network [OSTI]

Research Project Overview Introduction: 1.What is your topic? 2.What is your question? 3.What do Procedures: 6.What data do you need to test your hypothesis or meet your goal? 7. How do you plan to collect

305

RESEARCH PROJECTS February 13  

E-Print Network [OSTI]

will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration systems for heating and cooling in Mediterranean climate PROJECT REFERENCE: 218895 CALL: FP7-ENERGY-2007

Schenato, Luca

306

PROJECTION PURSUIT Jiayang Sun  

E-Print Network [OSTI]

PROJECTION PURSUIT Jiayang Sun Many data sets are high dimensional. It has been a common practice Friedman [7], Hall [11], Morton [21], Sun [23, 24], Cook et al. [2], Li and Cheng [19] and Roosen

Sun, Jiayang

307

Renewable energy projects approved  

Broader source: Energy.gov [DOE]

Two renewable energy projects representing a $100 million-plus investment by Las Vegas-based Nevada Power Co.—a cost likely to be covered over time by the utility's customers—were approved Wednesday by state regulators.

308

Portsmouth Paducah Project Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

being returned to inventory for reuse or resale. As part of the project, cylinders of uranium hexafluoride (UF6) feed material were inspected and pre-sampled to determine Tc-99...

309

INTERNSHIPS SPECIAL PROJECTS  

E-Print Network [OSTI]

. The five academic programs within CAUSES ­ architecture, environmental science, health education, nursing%), architecture (24%), dietetics & nutrition science (20%), and environmental scientists (20%). These projections PUBLIC HEALTH ENVIRONMENTAL SCIENCE CAUSES invites you to apply for SUMMER SEMESTER INTERNSHIPS through

District of Columbia, University of the

310

St. Bernard Project Update  

Broader source: Energy.gov [DOE]

The folks at St. Bernard Project are helping survivors of Hurricane Katrina get back into their homes -- and are using new technologies to reduce energy and save money for the returning residents.

311

CALIFORNIA ENERGY Project Brochures  

E-Print Network [OSTI]

the integrated design, construction, and operation of building systems. The Integrated Energy SystemsCALIFORNIA ENERGY COMMISSION Project Brochures Integrated Energy Systems: Productivity and Building of a larger research effort called Integrated Energy Systems: Productivity and Building Science Program

312

Navajo Electrification Demonstraiton Project  

SciTech Connect (OSTI)

This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

Larry Ahasteen, Project Manager

2006-07-17T23:59:59.000Z

313

Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) established the Portsmouth/Paducah Project Office (PPPO) on October 1, 2003, to provide focused leadership to the Environmental Management missions at the Portsmouth...

314

High efficiency III-nitride light-emitting diodes  

DOE Patents [OSTI]

Tailored doping of barrier layers enables balancing of the radiative recombination among the multiple-quantum-wells in III-Nitride light-emitting diodes. This tailored doping enables more symmetric carrier transport and uniform carrier distribution which help to reduce electron leakage and thus reduce the efficiency droop in high-power III-Nitride LEDs. Mitigation of the efficiency droop in III-Nitride LEDs may enable the pervasive market penetration of solid-state-lighting technologies in high-power lighting and illumination.

Crawford, Mary; Koleske, Daniel; Cho, Jaehee; Zhu, Di; Noemaun, Ahmed; Schubert, Martin F; Schubert, E. Fred

2013-05-28T23:59:59.000Z

315

Luminescent cyclometallated iridium(III) complexes having acetylide ligands  

DOE Patents [OSTI]

The present invention relates to phosphorescent (triplet-emitting) organometallic materials. The phosphorescent materials of the present invention comprise Ir(III)cyclometallated alkynyl complexes for use as triplet light-emitting materials. The Ir(III)cyclometallated alkynyl complexes comprise at least one cyclometallating ligand and at least one alkynyl ligand bonded to the iridium. Also provided is an organic light emitting device comprising an anode, a cathode and an emissive layer between the anode and the cathode, wherein the emissive layer comprises a Ir(III)cyclometallated alkynyl complex as a triplet emitting material.

Thompson, Mark E.; Bossi, Alberto; Djurovich, Peter Ivan

2014-09-02T23:59:59.000Z

316

III-V Growth on Silicon Toward a Multijunction Cell  

SciTech Connect (OSTI)

A III-V on Si multijunction solar cell promises high efficiency at relatively low cost. The challenges to epitaxial growth of high-quality III-Vs on Si, though, are extensive. Lattice-matched (LM) dilute-nitride GaNPAs solar cells have been grown on Si, but their performance is limited by defects related to the nitrogen. Advances in the growth of lattice-mismatched (LMM) materials make more traditional III-Vs, such as GaInP and GaAsP, very attractive for use in multijunction solar cells on silicon.

Geisz, J.; Olson, J.; McMahon, W.; Friedman, D.; Kibbler, A.; Kramer, C.; Young, M.; Duda, A.; Ward, S.; Ptak, A.; Kurtz, S.; Wanlass, M.; Ahrenkiel, P.; Jiang, C. S.; Moutinho, H.; Norman, A.; Jones, K.; Romero, M.; Reedy, B.

2005-11-01T23:59:59.000Z

317

Inductrack III configuration--a maglev system for high loads  

DOE Patents [OSTI]

Inductrack III configurations are suited for use in transporting heavy freight loads. Inductrack III addresses a problem associated with the cantilevered track of the Inductrack II configuration. The use of a cantilevered track could present mechanical design problems in attempting to achieve a strong enough track system such that it would be capable of supporting very heavy loads. In Inductrack III, the levitating portion of the track can be supported uniformly from below, as the levitating Halbach array used on the moving vehicle is a single-sided one, thus does not require the cantilevered track as employed in Inductrack II.

Post, Richard F

2013-11-12T23:59:59.000Z

318

The Mississippi CCS Project  

SciTech Connect (OSTI)

The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

Doug Cathro

2010-09-30T23:59:59.000Z

319

The OSER project  

E-Print Network [OSTI]

The OSER project (Optical Scintillation by Extraterrestrial Refractors) is proposed to search for scintillation of extragalactic sources through the galactic -- disk or halo -- transparent $\\mathrm{H\\_2}$ clouds, the last unknown baryonic structures. This project should allow one to detect column density stochastic variations in cool Galactic molecular clouds of order of $\\sim 3\\times 10^{-5} \\mathrm{g/cm^2}$ per $\\sim 10 000 \\mathrm{km}$ transverse distance.

Marc Moniez

2005-11-07T23:59:59.000Z

320

Black Pine Circle Project  

SciTech Connect (OSTI)

A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

Mytko, Christine

2014-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Black Pine Circle Project  

ScienceCinema (OSTI)

A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

Mytko, Christine

2014-09-15T23:59:59.000Z

322

A preparative study of the reaction between bismuth (III) bromide and amine hydrobromides  

E-Print Network [OSTI]

-isobutylammoniumpentabromo- bismuthate (III) Bi s-l, 3-dimethylbu tyl ammoni- umpentabromobi smutha (III) Bis-4-p1coliniumpentabromobis- muthate (III) Bis-cyclohexylammoniumpentabromo- bismuthate (III) Bis-piperidiniumpentabromobis- muthate (III) Bis...103 7. 5x103 7. 5x103 7. 5x103 7. 6x103 Tri, s-methyl ammoni um- hexabromobismuthate (III) 355 7. 5x103 7, 2x103 7 ~ 5xl03 7, 6x103 7. 5x103 20 TABLE III CONTINUED Tris-dimethylammonium- hexabromobismuthate (III) Tris...

Osborne, James Ferrell

1960-01-01T23:59:59.000Z

323

Structure and Stability of Hexa-Aqua V(III) Cations in Vanadium...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrolytes. Structure and Stability of Hexa-Aqua V(III) Cations in Vanadium Redox Flow Battery Electrolytes. Abstract: The Vanadium (III) cation structure in mixed acid based...

324

Trends in Ln(III) Sorption to Quartz Assessed by Molecular Dynamics...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ln(III) Sorption to Quartz Assessed by Molecular Dynamics Simulations and Laser Induced Flourescence Studies. Trends in Ln(III) Sorption to Quartz Assessed by Molecular Dynamics...

325

Microbial Reduction of Fe(III) in the Fithian and Muloorina Illites...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fe(III) in the Fithian and Muloorina Illites : Contrasting Extents and Rates of Bioreduction. Microbial Reduction of Fe(III) in the Fithian and Muloorina Illites : Contrasting...

326

A study of the reaction between bismuth (III) iodide and organic amine hydriodides  

E-Print Network [OSTI]

-benzyltrimethylammonium- nonaiododibismuthate(III) 56. 79 55. Z7 + 0. 07 27. tris-cyclehexylammonium- nonaiododibismuthate(III) 6l, 39 59. 92 0. 08 TABLE III Compound Concentration l=-"'). " ~ass ( '"' o-' Avg (ass liter mole-cm tris-methylammonium- nonaiododibismuthate(III) 10 8...-di-ethylammonium- nonaiododibismuthate(III) tris-tri-ethylammonium- nonaiododibismuthate(III) 10 8 6 4 10 8 6 4 7. 79 7. 75 7. 90 7. 90 7. 66 7. 66 7. 75 7. 78 7. 8 7. 7 TABLE III (Contd) Compound tris-n-propylammonium- hexaiodobismutbate(III) Concentration x...

Scott, Jack Clinton

1960-01-01T23:59:59.000Z

327

E-Print Network 3.0 - agn iii zw Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

19 A major radio outburst in III Zw 2 with an extremely inverted, millimeterpeaked spectrum Summary: A major radio outburst in III Zw 2 with an extremely inverted,...

328

NNSA project receives DOE Secretary's Award for Project Management...  

National Nuclear Security Administration (NNSA)

project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

329

Y-12 Steam Plant Project Received National Recognition for Project...  

National Nuclear Security Administration (NNSA)

Steam Plant Project Received National Recognition for Project Management Excellence | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

330

Uncompahgre Mesas Forest Restoration Project  

E-Print Network [OSTI]

March 2010 Uncompahgre Mesas Forest Restoration Project Collaboration Case Study #12;Uncompahgre Mesas Forest Restoration Project 1 1 Colorado Forest Restoration Institute Collaboration Case Study: Uncompahgre Mesas Forest Restoration Project Corrie Knapp Prepared for the Colorado Forest Restoration

331

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

332

Structural Properties of the Cr(III)-Fe(III) (Oxy)Hydroxide Compositional Series: Insights for a Nanomaterial “Solid Solution”  

SciTech Connect (OSTI)

Chromium(III) (oxy)hydroxide and mixed Cr(III)-Fe(III) (oxy)hydroxides are environmentally important compounds for controlling chromium speciation and bioaccessibility in soils and aquatic systems and are also industrially important as precursors for materials and catalyst synthesis. However, direct characterization of the atomic arrangements of these materials is complicated because of their amorphous X-ray properties. This study involves synthesis of the complete Cr(III)-Fe(III) (oxy)hydroxide compositional series, and the use of complementary thermal, microscopic, spectroscopic, and scattering techniques for the evaluation of their structural properties. Thermal analysis results show that the Cr end member has a higher hydration state than the Fe end member, likely associated with the difference in water exchange rates in the first hydration spheres of Cr(III) and Fe(III). Three stages of weight loss are observed and are likely related to the loss of surface/structural water and hydroxyl groups. As compared to the Cr end member, the intermediate composition sample shows lower dehydration temperatures and a higher exothermic transition temperature. XANES analysis shows Cr(III) and Fe(III) to be the dominant oxidation states. XANES spectra also show progressive changes in the local structure around Cr and Fe atoms over the series. Pair distribution function (PDF) analysis of synchrotron X-ray total scattering data shows that the Fe end member is nanocrystalline ferrihydrite with an intermediate-range order and average coherent domain size of {approx}27 {angstrom}. The Cr end member, with a coherent domain size of {approx}10 {angstrom}, has only short-range order. The PDFs show progressive structural changes across the compositional series. High-resolution transmission electron microscopy (HRTEM) results also show the loss of structural order with increasing Cr content. These observations provide strong structural evidence of chemical substitution and progressive structural changes along the compositional series.

Tang, Y.; Zhang, L.; Michel, F.M.; Harrington, R.; Parise, J.B.; Reeder, R.J.

2010-05-28T23:59:59.000Z

333

Structural Properties of the Cr(III)-Fe(III) (Oxy)hydroxide Compositional Series: Insights for a Nanomaterial "Solid Solution"  

SciTech Connect (OSTI)

Chromium(III) (oxy)hydroxide and mixed Cr(III)-Fe(III) (oxy)hydroxides are environmentally important compounds for controlling chromium speciation and bioaccessibility in soils and aquatic systems and are also industrially important as precursors for materials and catalyst synthesis. However, direct characterization of the atomic arrangements of these materials is complicated because of their amorphous X-ray properties. This study involves synthesis of the complete Cr(III)-Fe(III) (oxy)hydroxide compositional series, and the use of complementary thermal, microscopic, spectroscopic, and scattering techniques for the evaluation of their structural properties. Thermal analysis results show that the Cr end member has a higher hydration state than the Fe end member, likely associated with the difference in water exchange rates in the first hydration spheres of Cr(III) and Fe(III). Three stages of weight loss are observed and are likely related to the loss of surface/structural water and hydroxyl groups. As compared to the Cr end member, the intermediate composition sample shows lower dehydration temperatures and a higher exothermic transition temperature. XANES analysis shows Cr(III) and Fe(III) to be the dominant oxidation states. XANES spectra also show progressive changes in the local structure around Cr and Fe atoms over the series. Pair distribution function (PDF) analysis of synchrotron X-ray total scattering data shows that the Fe end member is nanocrystalline ferrihydrite with an intermediate-range order and average coherent domain size of 27 {angstrom}. The Cr end member, with a coherent domain size of 10 {angstrom}, has only short-range order. The PDFs show progressive structural changes across the compositional series. High-resolution transmission electron microscopy (HRTEM) results also show the loss of structural order with increasing Cr content. These observations provide strong structural evidence of chemical substitution and progressive structural changes along the compositional series.

Michel, Y.; Michel, F; Zhang, L; Harrington, R; Parise, J; Reeder, R

2010-01-01T23:59:59.000Z

334

H. R. 3113: an act providing for the coordinated operation of the Central Valley project and the State water project in California. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, March 25, 1985  

SciTech Connect (OSTI)

The House Committee on Energy and Natural Resources rewrote the Bill coordinating operations of the Central Valley Project in California and the state water project, and limited the Secretary of the Interior to no more than 75% of the Central Valley Project's annual yield. The Bill specifies procedures for water delivery contracts and reimbursements. Title II deals with the preservation of the Suisin Marsh District; Title III with the reclamation of small projects; and Title IV with contract validation. The document contains both the original and the amended wording of H.R. 3113.

Not Available

1986-01-01T23:59:59.000Z

335

Radioluminescence of curium(III) in solutions  

SciTech Connect (OSTI)

The radioluminescence of curium(III) under the action of the intrinsic ..cap alpha..-radiation was studied in aqueous, heavy water, and organic solutions. The luminescence maximum falls at lambda approx. 600 nm. The yield of radioluminescence G is proportional to the concentration (or electronic fraction) of curium, and for a 10/sup -2/ M aqueous solution of Cm(NO/sub 3/)/sub 3/, G approx. 5 x 10/sup -4/ quanta per 100 eV of absorbed energy. In dilute acids the yield of radioluminescence is the same as in neutral solution, but in concentrated acid it is substantially changed. In the presence of ligands (formate, acetate, citrate ions, and others), the yield of the radioluminescence of curium in aqueous solutions increases, which is associated with complex formation, leading to a decrease in the quenching of excited curium by water molecules. The intensification of the radioluminescence of curium in the presence of sodium paratungstate is especially great; it is suggested that in this case a significant role is played by energy transfer from the ligand to curium. H/sub 2/O/sub 2/, NH/sub 2/NH/sub 2/, NH/sub 2/OH, Ce/sup (IV)/, and uranium, neptunium, and plutonium ions in various oxidation states have no great influence on the radioluminescence of curium. Its quenching by NpO/sub 2//sup +/ ions is somewhat greater than by other actinide ions and is associated with the formation of cation-cation complexes of NpO/sub 2//sup 2 +/ with Cm/sup 3 +/. In heavy water and organic solutions, a substantial increase in the radioluminescence yield of curium is observed, which is in good agreement with the data on photoluminescence. The results obtained suggest that the radioluminescence of curium in solutions (in the absence of energy-donor ligands) is excited mainly directly, while the role of energy transfer to curium from the solvent or its radiolysis products is negligible.

Yusov, A.B.; Perminov, V.P.; Krot, N.N.; Kazakov, V.P.

1987-01-01T23:59:59.000Z

336

Antimony Based III-V Thermophotovoltaic Devices  

SciTech Connect (OSTI)

Antimony-based III-V thermophotovoltaic (TPV) cells are attractive converters for systems with low radiator temperature around 1100 to 1700 K, since these cells potentially can be spectrally matched to the thermal source. Cells under development include GaSb and the lattice-matched GaInAsSb/GaSb and InPAsSb/InAs quaternary systems. GaSb cell technology is the most mature, owing in part to the relative ease in preparation of the binary alloy compared to quaternary GaInAsSb and InPAsSb alloys. Device performance of 0.7-eV GaSb cells exceeds 90% of the practical limit. GaInAsSb TPV cells have been the primary focus of recent research, and cells with energy gap E{sub g} ranging from {approx}0.6 to 0.49 eV have been demonstrated. Quantum efficiency and fill factor approach theoretical limits. Open-circuit voltage factor is as high as 87% of the practical limit for the higher-E{sub g} cells, but degrades to below 80% with decreasing E{sub g} of the alloy, which might be due to Auger recombination. InPAsSb cells are the least studied, and a cell with E{sub g} = 0.45-eV has extended spectral response out to 4.3 {micro}m. This paper briefly reviews the main contributions that have been made for antimonide-based TPV cells, and suggests additional studies for further performance enhancements.

CA Wang

2004-06-09T23:59:59.000Z

337

About the EV Project Reports  

Broader source: Energy.gov (indexed) [DOE]

About the EV Project Reports The EV Project fact sheets and reports are based on data from several different sources (vehicle and electric vehicle supply equipment EVSE...

338

Portsmouth/Paducah Project Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Paducah Site Recovery Act project director. Recovery Act Projects East End Smelter - Recovery Act funding accelerated by 22 years the cleanup and demolition of a...

339

aging tests iii: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

94720 (Received 2 February 2006; accepted 2 March Ritchie, Robert 6 The CLEO-III RICH Detector and Beam Test Results HEP - Experiment (arXiv) Summary: We are constructing a Ring...

340

III-V High-Efficiency Multijunction Photovoltaics (Fact Sheet)  

SciTech Connect (OSTI)

Capabilities fact sheet that includes scope, core competencies and capabilities, and contact/web information for III-V High-Efficiency Multijunction Photovoltaics at the National Center for Photovoltaics.

Not Available

2011-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ap theory iii: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

23 24 25 Next Page Last Page Topic Index 1 AP Theory III: Cone-like Graded SUSY, Dynamic Dark Energy and the YM Millenium Problem Math Preprints (arXiv) Summary: Artin...

342

COMPUTER SCIENCE (Div. III) Chair, Associate Professor BRENT HEERINGA  

E-Print Network [OSTI]

1 COMPUTER SCIENCE (Div. III) Chair, Associate Professor BRENT HEERINGA Professors: BAILEY, DANYLUK, LENHART, MURTAGH*. Associate Professors: ALBRECHT*, FREUND**, HEERINGA, MCGUIRE. Computers and computation, business, and the arts. Understanding the nature of computation and exploring the great potential

Aalberts, Daniel P.

343

Physical Modeling Synthesis Update Julius O. Smith III  

E-Print Network [OSTI]

Physical Modeling Synthesis Update Julius O. Smith III Center for Computer Research in Music. They model wave propagation in distributed media such as strings, bores, horns, plates, and acoustic spaces

Smith III, Julius Orion

344

Synthesis and characterization of Fe(III)-silicate precipitation tubes  

SciTech Connect (OSTI)

Fe(III)-silicate precipitation tubes synthesized through 'silica garden' route have been characterized using a number of analytical techniques including X-ray diffraction, infrared spectroscopy, atomic force microscopy, scanning and transmission electron microscopy. These tubes are brittle and amorphous and are hierarchically built from smaller tubes of 5-10 nm diameters. They remain amorphous at least up to 650 {sup o}C. Crystobalite and hematite are the major phases present in Fe(III)-silicate tubes heated at 850 {sup o}C. Morphology and chemical compositions at the external and internal walls of these tubes are remarkably different. These tubes are porous with high BET surface area of 291.2 m{sup 2}/g. Fe(III)-silicate tubes contain significant amount of physically and chemically bound moisture. They show promise as an adsorbent for Pb(II), Zn(II), and Cr(III) in aqueous medium.

Parmar, K.; Pramanik, A.K. [National Metallurgical Laboratory, Council of Scientific and Industrial Research, Burmamines, Jamshedpur 831007 (India)] [National Metallurgical Laboratory, Council of Scientific and Industrial Research, Burmamines, Jamshedpur 831007 (India); Bandyopadhya, N.R. [Bengal Engineering and Science University, Shibpur, Howrah 711103 (India)] [Bengal Engineering and Science University, Shibpur, Howrah 711103 (India); Bhattacharjee, S., E-mail: santanu@nmlindia.org [National Metallurgical Laboratory, Council of Scientific and Industrial Research, Burmamines, Jamshedpur 831007 (India)

2010-09-15T23:59:59.000Z

345

Quantum capacitance in scaled down III-V FETs  

E-Print Network [OSTI]

As Si CMOS approaches the end of the roadmap, finding a new transistor technology that allows the extension of Moore's law has become a technical problem of great significance. Among the various candidates, III-V-based ...

Jin, Donghyun

2010-01-01T23:59:59.000Z

346

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

SciTech Connect (OSTI)

This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: ? Consolidation of the project team-players; ? Recruiting Koppers Industries as an additional stakeholder; ? Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; ? Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and ? Further progress made in the design of the commercial coking reactor.

ALBERT CALDERON

1998-09-22T23:59:59.000Z

347

National Ignition Facility project execution plan  

SciTech Connect (OSTI)

This project execution plan covers: Justification of Mission Need; Project Description; Management Roles and Responsibilities; Project Execution; Method of Accomplishment.

Paisner, J., LLNL

1997-08-01T23:59:59.000Z

348

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Broader source: Energy.gov (indexed) [DOE]

Draft Advanced Nuclear Energy Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS DRAFT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION...

349

2020 Vision Project Summary  

SciTech Connect (OSTI)

Since the 2020 Vision project began in 1996, students from participating schools have completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on US national security. This report summarizes the students' views and describes trends observed over the course of the 2020 Vision project's five years. It also highlights the main organizational features of the project. An analysis of thematic trends among the scenarios showed interesting shifts in students' thinking, particularly in their views of computer technology, US relations with China, and globalization. In 1996, most students perceived computer technology as highly beneficial to society, but as the year 2000 approached, this technology was viewed with fear and suspicion, even personified as a malicious, uncontrollable being. Yet, after New Year's passed with little disruption, students generally again perceived computer technology as beneficial. Also in 1996, students tended to see US relations with China as potentially positive, with economic interaction proving favorable to both countries. By 2000, this view had transformed into a perception of China emerging as the US' main rival and ''enemy'' in the global geopolitical realm. Regarding globalization, students in the first two years of the project tended to perceive world events as dependent on US action. However, by the end of the project, they saw the US as having little control over world events and therefore, we Americans would need to cooperate and compromise with other nations in order to maintain our own well-being.

Gordon, K.W.; Scott, K.P.

2000-11-01T23:59:59.000Z

350

Radiation Embrittlement Archive Project  

SciTech Connect (OSTI)

The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

Klasky, Hilda B [ORNL] [ORNL; Bass, Bennett Richard [ORNL] [ORNL; Williams, Paul T [ORNL] [ORNL; Phillips, Rick [ORNL] [ORNL; Erickson, Marjorie A [ORNL] [ORNL; Kirk, Mark T [ORNL] [ORNL; Stevens, Gary L [ORNL] [ORNL

2013-01-01T23:59:59.000Z

351

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network [OSTI]

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

352

PROJECT SELF-EVALUATION METHODOLOGY: THE HEALTHREATS PROJECT CASE STUDY  

E-Print Network [OSTI]

PROJECT SELF-EVALUATION METHODOLOGY: THE HEALTHREATS PROJECT CASE STUDY Martin Znidarsic1 , Marko presents an approach to self-evaluation in collaborative research projects. The approach is taken from a case study of the project Healthreats, where it is used in practice. Aims and focuses of self

Bohanec, Marko

353

Project Background Transportation projects can stall for a number of  

E-Print Network [OSTI]

Project Background Transportation projects can stall for a number of reasons. One reason is that those responsible for the project lack the skills to move beyond conflicts with resource agency staff work on a pilot program aimed at confronting these two causes. The project had these objectives

Minnesota, University of

354

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 15 3 Project management and coordination 15 4 Cost breakdown 15 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality;cation: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

355

Project Management and Analysis Project Conception and Execution  

E-Print Network [OSTI]

by the World Bank at a cost of $ 600,000. The objectives of the project are: Analyze the supply and demandTD 608 Project Management and Analysis Part I Project Conception and Execution Milind Sohoni Discussion () January 29, 2008 1 / 3 #12;The K-East Ward Water Project Proceed to the web location: www

Sohoni, Milind

356

Eagle Project Update Eagle P3 Project Update  

E-Print Network [OSTI]

) offers 11-minute travel time to Westminster #12;5 Eagle P3 Project Scope · Overall capital cost $2 for cost effective index · Allows RTD to spread the cost of the project over a longer time periodEagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital

Bustamante, Fabián E.

357

Chapter 29. The Retinal Implant Project The Retinal Implant Project  

E-Print Network [OSTI]

-04A1 VA Center for Innovative Visual Rehabilitation MOSIS provides IC fabrication at no cost ProjectChapter 29. The Retinal Implant Project 29-1 The Retinal Implant Project RLE Group Retinal Implant Drohan, Dr. William Ellersick, Oscar Mendoza Introduction to the Retinal Implant Project The Retinal

358

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 17 3 Project management and coordination 17 4 Cost breakdown 17 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality Classification: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

359

Project Execution Plan Electron Beam Ion Source Project  

E-Print Network [OSTI]

Project Execution Plan for the Electron Beam Ion Source Project (EBIS) Project # 07-SC-02 at Brookhaven National Laboratory Upton, NY For the U.S. Department of Energy Office of Science Office of Nuclear Physics (SC ­ 26) Rev. 1 May 2008 #12;#12;#12;4 Project Execution Plan for the Electron Beam Ion

360

VOLUNTARY OBSERVING SHIPS (VOS) CLIMATE SUBSET PROJECT (VOSCLIM) PROJECT DOCUMENT  

E-Print Network [OSTI]

. Data management procedures 8. Project management 9. Information exchange Attachment 1: ScientificWMO IOC JCOMM VOLUNTARY OBSERVING SHIPS (VOS) CLIMATE SUBSET PROJECT (VOSCLIM) PROJECT DOCUMENT #12 Attachment 5: List of focal points Attachment 7: Preliminary action plan #12;PROJECT DOCUMENT

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

FY10 LDRD Projects 2010 Projects Page 1  

E-Print Network [OSTI]

of Large Liquid Argon Time Projection Chambers (LArTPC) for Future Neutrino Experiments Lanni, F. Phys/510FY10 LDRD Projects 2010 Projects Page 1 LDRD Proj. No. Project Title P.I. Dept./Bldg. 07 Soils van der Lelie, D. BIO/463 10-001 Petascale Data Mining for BNL Data Intensive Sciences Yu, Dantong

Ohta, Shigemi

362

Nanowires, Capacitors, and Other Novel Outer-Surface Components Involved in Electron Transfer to Fe(III) Oxides in Geobacter Species  

SciTech Connect (OSTI)

The overall goal of this project was to better understand the mechanisms by which Geobacter species transfer electrons outside the cell onto Fe(III) oxides. The rationale for this study was that Geobacter species are often the predominant microorganisms involved in in situ uranium bioremediation and the growth and activity of the Geobacter species during bioremediation is primarily supported by electron transfer to Fe(III) oxides. These studies greatly expanded the understanding of electron transfer to Fe(III). Novel concepts developed included the potential role of microbial nanowires for long range electron transfer in Geobacter species and the importance of extracytoplasmic cytochromes functioning as capacitors to permit continued electron transfer during the hunt for Fe(III) oxide. Furthermore, these studies provided target sequences that were then used in other studies to tract the activity of Geobacter species in the subsurface through monitoring the abundance of gene transcripts of the target genes. A brief summary of the major accomplishments of the project is provided.

Lovley, Derek, R.

2008-12-22T23:59:59.000Z

363

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

364

Project management is not an accidental profession .  

E-Print Network [OSTI]

??This study investigates project management as a professional discipline and project manager as a professional person. Projects and the role of the project manager in… (more)

Thobejane, Magarule Hendrick

2008-01-01T23:59:59.000Z

365

December 2014 Project Dashboard | Department of Energy  

Office of Environmental Management (EM)

December 2014 Project Dashboard December 2014 Project Dashboard December 2014 Project Dashboard.pdf More Documents & Publications 2011-05-19 Project Dashboard.xls...

366

GEOL 5303 Project Presentations Presenter name: ______________________________________________  

E-Print Network [OSTI]

pertinent materials. 10 7 4 0 Conclusion: What did you learn? Presenter summarizes total project (triumphsGEOL 5303 Project Presentations Presenter name: ______________________________________________ Project title: ___________________________________________________________ Project content Superb

Smith-Konter, Bridget

367

Project ACHIEVE final report  

SciTech Connect (OSTI)

Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

NONE

1997-06-13T23:59:59.000Z

368

QER- Comment of William Smith III  

Broader source: Energy.gov [DOE]

Hello DOE, Thanks for accepting my comments on the Quadrennial Energy Review by e-mail. There will be those who wish to promote nuclear energy as a source of electricity for future use in the USA. I speak against this form of energy. Because it creates long-lived radioactive wastes, nuclear power is incompatible with the biological world in which we live and from which we evolved. The lasting nature of these wastes creates a moral quandry for us in this generation, as we leave behind such biological poisons for our descents to manage, in ways which we do not yet know. A further problem with nucler energy is that any fission reaction creates plutonium, the stuff of nuclear weapons. If nuclear power reactors were to be spread around the world, inevitably the proliferation of nuclear weapons would follow. So-called '4th generation' or 'thorium' reactors suffer from a similar problem, for although they may generate less plutonium, their fuel cycle involves creation of large amounts of U-233 which carries a similar proliferation risk to plutonium-239. I advocate crafting an energy future for our nation bsed on the natural flows of renewable energy, coupled with a diversified structure which generates electricity at many smaller sources. Implicit in any modern energy system is the increased efficiency of energy usage which will continue to lower the bulk amounts of energy, particularly electricity, which our society uses to satisfy our industrial, military, commercial, and personal needs. Clearly as a nation we must participate in the worldwide effort to control the buildup of carbon dioxide gases and other pollutants which threaten the stability of the earth's climate. I would like to bring to your attention these papers from the Rocky Mountain Institute which touch on the above issues: http://www.rmi.org/Knowledge-Center/Library/2009-09_FourNuclearMyths and http://www.rmi.org/Knowledge-Center/Library/2012-01_FarewellToFossilFuels and http://www.rmi.org/Knowledge-Center/Library/E05-14_NuclearPowerEconomics.... If you have not yet done so, I strongly urge you to contact the Rocky Mountain Institute and contract with them for their advice in consulting on the Quadrennial Energy Review. Sincerely, William Wharton Smith III

369

Cogeneration Project Analysis Update  

E-Print Network [OSTI]

in the project. For the typical system, as shown in Figure 2, sulfur and NOx are the prime fuel related environmental concerns. Another fuel related concern, which may surface during operation is the opacity of the exhaust. However, if the system is well... designed, this should not be a problem; Depending on the type of system and fuel used, you may need to treat the stack gases to be in compliance. This in itself will increase the project cost and complicate the system operation. Fuel Cost Criteria Ve...

Robinson, A. M.; Garcia, L. N.

370

Biofuels: Project summaries  

SciTech Connect (OSTI)

The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

Not Available

1994-07-01T23:59:59.000Z

371

CONNECTICUT BIOFUELS TECHNOLOGY PROJECT  

SciTech Connect (OSTI)

DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

BARTONE, ERIK

2010-09-28T23:59:59.000Z

372

Project of the Month  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil'sofAppendix B, SeptemberandID ProjectBaseloadProject

373

Projects | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil'sofAppendix B, SeptemberandIDLDRD Project ListProjects

374

Project1.qxd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgressProjectPeerProject of the Month

375

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Estimated Annual Amount For Amount Source STATE UNIVERSITY SYSTEM 2012-2013 Fixed Capital Outlay ProjectsProject Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description that will respond to the latest trends in small-group learning, technology resources, and collaboration spaces

Slatton, Clint

376

Combined Heat and Power Projects  

Broader source: Energy.gov [DOE]

DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

377

AIDP -Apple Interface Design Project  

E-Print Network [OSTI]

AIDP - Apple Interface Design Project AIDP - Apple Interface Design Project m 92-95 m Joy Mountford m Design Centre, Advanced Technology Group m Apple's Industrial Design Group "Encourage ProjectThe Project m Bridge the gulf between the physical and virtual worlds - Apple m Design a new way

Tollmar, Konrad

378

Cost Comparison of Public Elementary School Construction Costs Based on Project Delivery System in the State of Texas  

E-Print Network [OSTI]

and cost controls. Reinisch and Caguioa (2010) noted that there are several methods for choosing what the construction authority considers the most appropriate project delivery system. Nichols and Feigenbaum (Feigenbaum, 2011; Nichols, 2011) observed... Members, Leslie H. Feigenbaum Head of Department, Joseph P. Horlen December 2011 Major Subject: Construction Management iii ABSTRACT Cost Comparison of Public Elementary School Construction Costs Based on Project Delivery System in the State...

Reinisch, Ashley

2012-02-14T23:59:59.000Z

379

QUEST2 Energy Project  

E-Print Network [OSTI]

In late 2004, Eastman Chemical Company’s Kingsport Site Utilities Division embarked on a project to investigate operations in one of the large refrigeration systems serving one of the process areas. The intent of this effort was to develop a...

Clary, A. T.

2007-01-01T23:59:59.000Z

380

The FORM project  

E-Print Network [OSTI]

The necessity of the FORM project is discussed. Then the evolutionary needs in particle physics are considered, looking at the trends over the years. A guess is made at what will be needed in the (near) future. The whole is concluded with some critical remarks concerning the publication of results and programs.

J. A. M. Vermaseren

2008-06-25T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

COASTAL FLOODINGPOTENTIAL PROJECTIONS: 20002100  

E-Print Network [OSTI]

the twentyfirst century was estimated from both ocean wave and sea level rise projections produced from global height reached by wavedriven water levels), which depends on the instantaneous sea level (or still water level), beach slope, and wave height and wave period. The still water level is the superposition

382

Environmental of Forestry Projects  

E-Print Network [OSTI]

Environmental Impact Assessment of Forestry Projects #12;EnvironmentalImpactAssessment 2 Flow chart Details of the Environmental Statement publicised for comment FC considers ES and any comments received FC the issues of concern that need to be covered in the Environmental Statement (ES). The Environmental

383

Baytown Cogeneration Project  

E-Print Network [OSTI]

The Baytown Cogeneration Project installed a GE 7FA gas turbine generator that produces 160 MW of electricity and 560-klB/hr of superheated 1500-psig steam. All of the steam and electricity are consumed by the ExxonMobil Refinery & Chemical Plant...

Lorenz, M. G.

2007-01-01T23:59:59.000Z

384

Project Summary Partnership Inspiration  

E-Print Network [OSTI]

Businesses are hunting for solutions to reduce their carbon footprint and energy spend. This project follows as they help overcome the challenges of auditing and reducing the organisational carbon footprint. A television the practices of other organisations. University of East Anglia, 5** rated School of Environmental Sciences CRed

Everest, Graham R

385

ISOE Pilot Project Update  

SciTech Connect (OSTI)

This slide show introduces the Pilot Project to increase the value of Information System on Occupational Exposure (ISOE)#11;data by increasing participation and amount of data reported from the U.S., reduce the hurdles and effort in participating, streamline the process of reporting and reduce time delay, and eliminate data entry and redundant effort.

D. A. Hagemeyer D. E. Lewis

2012-05-05T23:59:59.000Z

386

Information Technology Project Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides Department of Energy recommended guidelines to ensure that the acquisition of information technology capital assets is performed in compliance with DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE N 251.105.

2008-09-12T23:59:59.000Z

387

COLORADO CLIMATE PREPAREDNESS PROJECT  

E-Print Network [OSTI]

COLORADO CLIMATE PREPAREDNESS PROJECT FINAL REPORT Prepared by the Western Water Assessment for the State of Colorado #12;#12;Authors Kristen Averyt University of Colorado Boulder, CU-NOAA Western Water Assessment Kelsey Cody University of Colorado Boulder, Environmental Studies Program Eric Gordon University

Neff, Jason

388

Pioneering Heat Pump Project  

Broader source: Energy.gov [DOE]

Project objectives: To install and monitor an innovative WaterFurnace geothermal system that is technologically advanced and evolving; To generate hot water heating from a heat pump that uses non-ozone depleting refrigerant CO2. To demonstrate the energy efficiency of this system ground source heat pump system.

389

Ceramic Technology Project  

SciTech Connect (OSTI)

The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

Not Available

1992-03-01T23:59:59.000Z

390

Project Title: Residential wind turbine design Project Description: This project aims to  

E-Print Network [OSTI]

that wind is expected to come. Therefore it may be a good idea to consider a vertical-axis wind turbine of the conventional wind turbines use horizontal- axis configuration (see Fig. 1) and is aligned with the directionPROJECT 1: Project Title: Residential wind turbine design Project Description: This project aims

Muradoglu, Metin

391

California Hydrogen Infrastructure Project  

SciTech Connect (OSTI)

Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ���¢��������real-world���¢������� retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation���¢��������s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products���¢�������� Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user���¢��������s fueling experience.

Edward C. Heydorn

2013-03-12T23:59:59.000Z

392

THE DEEP SWIRE FIELD. III. WIYN SPECTROSCOPY  

SciTech Connect (OSTI)

We present the results of spectroscopy using HYDRA on the WIYN 3.5 m telescope of objects in the deep SWIRE radio field. The goal of the project was to determine spectroscopic redshifts for as many of the brighter objects in the field as possible, especially those detected in the radio and at 24 {mu}m. These redshifts are primarily being used in studies of galaxy evolution and the connection of that evolution to active galactic nuclei and star formation. Redshifts measured for 365 individual objects are reported. The redshifts range from 0.03 to 2.5, mostly with z < 0.9. The sources were selected to be within the WIYN HYDRA field of approximately 30' in radius from the center of the SWIRE deep field, 10{sup h}46{sup m}00{sup s}, 59{sup 0}01'00'' (J2000). Optical sources for spectroscopic observation were selected from an r-band image of the field. A priority list of spectroscopic targets was established in the following order: 20 cm detections, 24 m detections, galaxies with r < 20 and the balance made up of fainter galaxies in the field. We provide a table listing the galaxy positions, measured redshift and error, and note any emission lines that were visible in the spectrum. In practice, almost all the galaxies with r < 19 were observed including all of the radio sources and most of the 24 {mu}m sources with r < 20 and a sample of radio sources which had fainter optical counterparts on the r-band image.

Owen, Frazer N. [National Radio Astronomy Observatory , P.O. Box O, Socorro, NM 87801 (United States); Morrison, G. E. [Institute for Astronomy, University of Hawaii, Honolulu, 96822 (United States)], E-mail: fowen@nrao.edu

2009-06-15T23:59:59.000Z

393

Nucla CFB Demonstration Project  

SciTech Connect (OSTI)

This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

Not Available

1990-12-01T23:59:59.000Z

394

Healy Clean Coal Project  

SciTech Connect (OSTI)

The Healy Clean Coal Project, selected by the U.S. Department of Energy under Round 111 of the Clean Coal Technology Program, has been constructed and is currently in the Phase 111 Demonstration Testing. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the U.S. Department of Energy. Construction was 100% completed in mid-November of 1997, with coal firing trials starting in early 1998. Demonstration testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of nitrogen oxides (NOx), sulfur dioxide (S02), and particulate from this 50-megawatt plant are expected to be significantly lower than current standards.

None

1997-12-31T23:59:59.000Z

395

Moisture Metrics Project  

SciTech Connect (OSTI)

the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

Schuchmann, Mark

2011-08-31T23:59:59.000Z

396

Forecasting potential project risks through leading indicators to project outcome  

E-Print Network [OSTI]

During project execution, the status of the project is periodically evaluated, using traditional methods or standard practices. However, these traditional methods or standard practices may not adequately identify certain issues, such as lack...

Choi, Ji Won

2007-09-17T23:59:59.000Z

397

Evaluation of Technology Risk in Project Cogeneration Project Returns  

E-Print Network [OSTI]

The economic returns of a cogeneration project are a direct function of the project margin, that is, the difference between revenues and expenses. Revenues and expenses, of course, are made up of both variable and fixed components. The revenues...

Thoennes, C. M.

398

Awarded ESPC Projects  

Broader source: Energy.gov [DOE]

Since the inception of the U.S. Department of Energy's (DOE) energy savings performance contracts (ESPCs) in 1998, 325 DOE ESPC projects have been awarded. More than $3.41 billion has been invested in Federal energy efficiency and renewable energy improvements. These improvements have resulted in more than 398 trillion Btu life cycle energy savings and more than $8.53 billion of cumulative energy cost savings for the Federal Government.

399

Baytown Energy Project  

E-Print Network [OSTI]

BAYTOWN ENERGY PROJECT John R. Porter Staff Engineer ExxonMobil Chemical Company Baytown, Texas Modernization in a mature industry, such as commodity chemicals, is a challenge. As new, efficient plants in Asia come on stream, older... plants must become more efficient just to remain competitive. Much of the equipment currently in service at the ExxonMobil Baytown Chemical Plant's aromatics recovery complex was built in the 1940's. While it is certainly profitable to stretch...

Porter, J.

2006-01-01T23:59:59.000Z

400

Saudi MTBE project revived  

SciTech Connect (OSTI)

Alujain Corp., a member of the Xenel group of Saudi Arabia, is going ahead with plans to build an 800,000-m.t./year methyl tert-butyl ether (MTBE) plant. Bechtel has been appointed project manager for the plant, which will be owned by a new company, National Fuel Additives (Tahseen). Bechtel will help evaluate proposals already submitted for the lump sum turnkey job.

NONE

1996-01-17T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Step 4: Project Implementation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverviewFranklinStatusJ.R. Simplot4: Project

402

POPULATION III STARS AND REMNANTS IN HIGH-REDSHIFT GALAXIES  

SciTech Connect (OSTI)

Recent simulations of Population III star formation have suggested that some fraction form in binary systems, in addition to having a characteristic mass of tens of solar masses. The deaths of metal-free stars result in the initial chemical enrichment of the universe and the production of the first stellar-mass black holes. Here we present a cosmological adaptive mesh refinement simulation of an overdense region that forms a few 10{sup 9} M{sub Sun} dark matter halos and over 13,000 Population III stars by redshift 15. We find that most halos do not form Population III stars until they reach M{sub vir} {approx} 10{sup 7} M{sub Sun} because this biased region is quickly enriched from both Population III and galaxies, which also produce high levels of ultraviolet radiation that suppress H{sub 2} formation. Nevertheless, Population III stars continue to form, albeit in more massive halos, at a rate of {approx}10{sup -4} M{sub Sun} yr{sup -1} Mpc{sup -3} at redshift 15. The most massive starless halo has a mass of 7 Multiplication-Sign 10{sup 7} M{sub Sun }, which could host massive black hole formation through the direct gaseous collapse scenario. We show that the multiplicity of the Population III remnants grows with halo mass above 10{sup 8} M{sub Sun }, culminating in 50 remnants located in 10{sup 9} M{sub Sun} halos on average. This has implications that high-mass X-ray binaries and intermediate-mass black holes that originate from metal-free stars may be abundant in high-redshift galaxies.

Xu Hao; Norman, Michael L. [Center for Astrophysics and Space Sciences, University of California, San Diego, 9500 Gilman Drive, La Jolla, CA 92093 (United States); Wise, John H., E-mail: hxu@ucsd.edu, E-mail: mlnorman@ucsd.edu, E-mail: jwise@gatech.edu [Center for Relativistic Astrophysics, School of Physics, Georgia Institute of Technology, 837 State Street, Atlanta, GA 30332 (United States)

2013-08-20T23:59:59.000Z

403

Milliwatt Generator Project  

SciTech Connect (OSTI)

This report covers progress on the Milliwatt Generator Project from April 1986 through March 1988. Activities included fuel processing and characterization, production of heat sources, fabrication of pressure-burst test units, compatibility studies, impact testing, and examination of surveillance units. The major task of the Los Alamos Milliwatt Generator Project is to fabricate MC2893A heat sources (4.0 W) for MC2730A radioisotope thermoelectric generators (RTGS) and MC3599 heat sources (4.5 W) for MC3500 RTGs. The MWG Project interfaces with the following contractors: Sandia National Laboratories, Albuquerque (designer); E.I. du Pont de Nemours and Co. (Inc.), Savannah River Plant (fuel); Monsanto Research Corporation, Mound Facility (metal hardware); and General Electric Company, Neutron Devices Department (RTGs). In addition to MWG fabrication activities, Los Alamos is involved in (1) fabrication of pressure-burst test units, (2) compatibility testing and evaluation, (3) examination of surveillance units, and (4) impact testing and subsequent examination of compatibility and surveillance units.

Latimer, T.W.; Rinehart, G.H.

1992-05-01T23:59:59.000Z

404

The Araucaria Project  

E-Print Network [OSTI]

{Results from a long-term observational project called the Araucaria Project are presented. Based on Wide Field optical monitoring of 8 nearby galaxies, covering a large range of metallicities, more than 500 Cepheids and a few hundred Blue Supergiant candidates were identified. From the analysis of Cepheid P-L relations of outstanding quality derived from our data we conclude that the slope of these relations in the I band and Wesenheit index are not dependent on metallicity. Comparing the I-band magnitudes of Cepheids of a period of ten days, as computed from our P-L relations, to the I-band magnitudes of the tip of the RGB, which is widely believed to be independent of population effects, we cannot see any obvious dependence of the zero point of the I-band P-L relation on metallicity. A preliminary analysis of IR follow-up observations of sub-samples of the identified Cepheids in various galaxies of the project show that the distances obtained from these data are systematically shorter by about of 0.1 mag than those derived from the optical photometry. It is likely that this effect can be attributed to the internal reddening in the program galaxies.

G. Pietrzynski; W. Gieren

2005-09-22T23:59:59.000Z

405

Project Management Plan  

SciTech Connect (OSTI)

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

406

Final project report  

SciTech Connect (OSTI)

The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

Nitin S. Baliga and Leroy Hood

2008-11-12T23:59:59.000Z

407

Final Project Report  

SciTech Connect (OSTI)

This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

Bogucz, E A

2010-12-13T23:59:59.000Z

408

Surfactant EOR project evaluated  

SciTech Connect (OSTI)

The Union Oil Co.'s Uniflood process has successfully mobilized and produced tertiary oil from a micellar-polymer pilot project on the Hegberg lease in the El Dorado field, Kansas. This half-completed EOR flood has recovered over 11% of the waterflood residual oil and is currently producing at an oil cut of 10%. Oil recovery has been limited by (1) the presence of gypsum in portions of the reservoir which adversly affects injected chemicals, (2) poor quality reservoir rock in one quadrant of the pilot, and (3) a substantial fluid drift (30 ft/year) which causes a portion of the injected chemicals to flow out of the pilot pattern. The El Dorado demonstration project is a joint experiment covered by a cost-sharing contract between the U.S. Department of Energy and Cities Service Company. It was proposed as a micellar-polymer process in a highly saline (10 wt % salts) reservoir that had been waterflooded to residual oil. Despite the extended project life, and indications that total recovery efficiency will be less than originally predicted, oil response in the Hegberg pattern is encouraging for application of the micellar-polymer process in high brine reservoirs.

Holm, L.W.

1984-07-16T23:59:59.000Z

409

NREL Smart Grid Projects  

SciTech Connect (OSTI)

Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

Hambrick, J.

2012-01-01T23:59:59.000Z

410

Horse Hollow III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:PhotonHolyName HousingIII Wind Farm Facility Horse Hollow III

411

Project Management and Analysis Project Conception and Execution  

E-Print Network [OSTI]

TD 608 Project Management and Analysis Part I Project Conception and Execution Milind Sohoni of the paper? How does the author compare India and Pakistan? Do you agree with the cost-benefit analysis? What are your criticisms? Compare the CBA with our 6-goat system. Comment on the viability of the project

Sohoni, Milind

412

The CLEANLE project within HOMOFABER framework The CLEANLE project  

E-Print Network [OSTI]

The CLEANLE project within HOMOFABER framework The CLEANLE project within HOMOFABER framework Presentation for students involvement during spring semester 2011 #12;The CLEANLE project within HOMOFABER framework The Interdisciplinary Aerodynamics Group (IAG) · Cost group within EPFL-STI ­ Administrated

413

Project Information Form Project Title Eco-Driving for Transit  

E-Print Network [OSTI]

Provided (by each agency or organization) DOT - $54,871.35 Total Project Cost $54,871.35 Agency IDProject Information Form Project Title Eco-Driving for Transit University Georgia Institute Project Second-by-second data for school buses, MARTA transit buses, and GRTA express buses

California at Davis, University of

414

Project Management Business Process Project Delivery Processes Includes VE Budget  

E-Print Network [OSTI]

Project Management Business Process Project Delivery Processes Includes VE Budget Schedule Activities that do/could feed into PMBP LEGEND VE Cost Avoidance Program Coverage Document Results (Before, could use the value methodology to facilitate after action review. The project manager is responsible

US Army Corps of Engineers

415

PETITION FOR INSIGNIFICANT PROJECT MODIFICATION  

E-Print Network [OSTI]

Cosumnes River Boulevard Interchange SMUD Cogeneration Pipeline Project Docket No. 92-AFC-2P July 2007, CA 95833 #12;SMUD COGENERATION PIPELINE PROJECT Table of Contents K:\\Wprocess\\25832\\SMUD

416

Project Approval Form Concentration in  

E-Print Network [OSTI]

Project Approval Form Concentration in Nanotechnology Return completed form to ENG Undergraduate of Graduation:____________________________ Instructions: Please check one of the following ways in which you Plan to complete the project as a requirement for the concentration in Nanotechnology. Depending upon

Goldberg, Bennett

417

Environmental Management (EM) Cleanup Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

2008-09-24T23:59:59.000Z

418

Energy and Utility Project Review  

Broader source: Energy.gov [DOE]

The DNR's Office of Energy and Environmental Analysis is responsible for coordinating the review of all proposed energy and utility projects in the state. The Office provides project management...

419

Risk Management In Major Projects   

E-Print Network [OSTI]

The integration of risk management in major projects within the construction and oil and gas industries has never been more significant especially as these projects are becoming larger and more complex. The increased ...

Baker, Scott William

420

Indian River Hydroelectric Project Grant  

SciTech Connect (OSTI)

This Final Technical Report provides a concise retrospective and summary of all facets of the Sheldon Jackson College electrical Infrastructure Renovation portion of the Indian River Hydroelectric Project Grant of the City and Borough of Sitka, Alaska. The Project Overview describes the origins of the project, the original conditions that provided the impetus for the grant funding, how the grant amendment was developed, the conceptual design development, and the actual parameters of the final project as it went out to bid. The Project Overview also describes the ''before and after'' conditions of the project. The Objectives division of this Final Technical Report describes the amendment-funded goals of the project. It also describes the milestones of project development and implementation, as well as, the rationale behind the milestone array. The Description of Activities Performed division of this report provides an in-depth chronological analysis of progressive project implementation. Photographs will provide further illustration of particular functional aspects of the renovation project within project parameters. The Conclusions and Recommendations division of this report provides a comprehensive retrospective analysis of the project.

Rebecca Garrett

2005-04-29T23:59:59.000Z

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Innovation Program Student Initiated Project  

E-Print Network [OSTI]

Innovation Program Student Initiated Project Proposal Guidelines Eligibility The team must include be willing to present the project (regardless of its degree of success) at a showcase event Proposal Guideline Proposal limited to 1 page, 1" margins, and an 11 point or larger font Project title Team

Bertini, Robert L.

422

Livestock Odor Reduction Demonstration Project  

E-Print Network [OSTI]

Livestock Odor Reduction Demonstration Project Objectives The 1996 and 1997 Iowa General Assembly-share basis to livestock producers and operators selected to carry out various demonstration projects. Organization The Livestock Odor Reduction Demonstration Project was administered by ISU Extension. Stewart

Lin, Zhiqun

423

Project ID _________________ OSP October 2010  

E-Print Network [OSTI]

· Office for Sponsored Programs 90 Days BEFORE Project End Date Determine if no-cost extension is needed Review project budget Confirm accuracy of all expenses Prevent cost overruns Review and close fringe and F&A allocations Submit cost transfer requests, if needed Review reporting due dates AT Project

Huang, Jianyu

424

Handbook for Degree Project Writers  

E-Print Network [OSTI]

and write a popular science or scholarly summary of your work. The degree project marks the end of yourHandbook for Degree Project Writers MASTER'S PROGRAMMES IN ENGINEERING 2012 THE FACULTY is a degree project? .......................... 5 What is the role of the examiner?............... 5 What

425

PI & Project Team PAF Changes  

E-Print Network [OSTI]

Proposal Management PI & Project Team PAF Changes Step-By-Step Procedures Last updated: 4/1/2013 1 of 10 http://eresearch.umich.edu PAF Changes This procedure details how the PI & Project Team can: Make Management PI & Project Team PAF Changes Step-By-Step Procedure Last updated: 4/1/2013 3 of 10 http

Shyy, Wei

426

Emergency and Abnormal Situations Project  

E-Print Network [OSTI]

and Procedures #12;Emergency and Abnormal Situations Project Taxonomy of the Domain Philosophies Philosophies Project Taxonomy of the Domain #12;Development of Checklists and Procedures Philosophies DefinitionsEmergency and Abnormal Situations Project Barbara Burian, Ph.D. SJSUF / NASA Ames Research Center

427

Office: ITO PE/Project  

E-Print Network [OSTI]

Mgr.: Mills/Swinson PAD No.: Smart Spaces Moving Through Smart Spaces "city-wide appliances" "in1 DARPA Office: ITO PE/Project: Pgm No.: Pgm Mgr.: Mills/Swinson PAD No.: Smart Spaces Personal Information Projection · Develop techniques for projecting personal information from cyberspace into smart

Mills, Kevin

428

Degree project in Communication Systems  

E-Print Network [OSTI]

Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden M A N X I N G D U in upgrading their network capacity. However, an important conclusion from this thesis project be more efficient. It should be noted that the mobile terminals covered in the project are connected

Maguire Jr., Gerald Q.

429

Degree project in Communication Systems  

E-Print Network [OSTI]

Degree project in Communication Systems First level, 15.0 HEC Stockholm, Sweden R A F I D K A R I M is considered by many to be a driving force in the next generation Internet. This project uses very in expensive the desired user functionality. This bachelor's thesis project made it possible for a PoE powered circuit

Maguire Jr., Gerald Q.

430

Degree project in Communication Systems  

E-Print Network [OSTI]

Degree project in Communication Systems Second level, 30.0 HEC Stockholm, Sweden Y O U B E I J I N's thesis project concerns Sharplet, a spaced repetition system based web service, who is trying to stand. The main practical result of this master's thesis project is a working prototype audio and video enabled

Maguire Jr., Gerald Q.

431

Muddy River Restoration Project Begins  

E-Print Network [OSTI]

Muddy River Restoration Project Begins Page 5 #12;2 YANKEE ENGINEER February 2013 Yankee Voices of the Muddy River Restoration project. Inset photo: Flooding at the Muddy River. Materials provided by Mike Project Manager, on the passing of his father in law, Francis James (Jim) Murray, Jan. 9. ... to Laura

US Army Corps of Engineers

432

Learning Management System Transition Project  

E-Print Network [OSTI]

Learning Management System Transition Project Kickoff Jim Snell Director Instructional Technology Services #12;History · Texas A&M started using the Campus Edition WebCT learning management system (LMS Process March 2012 · Project manager hired March 2012 · ITS project team assigned April 2012 · Contract

433

Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

Not Available

1994-06-14T23:59:59.000Z

434

To: Chairman, MSc Project Committee Project for examination in Trinity Term 2013 MSc Computer Science  

E-Print Network [OSTI]

Science Project Registration STUDENT NAME:........................... COLLEGETo: Chairman, MSc Project Committee Project for examination in Trinity Term 2013 MSc Computer................................................ PROJECT TITLE

Oxford, University of

435

To: Chairman, MSc Project Committee Project for examination in Trinity Term 2012 MSc Computer Science  

E-Print Network [OSTI]

Science Project Registration STUDENT NAME:........................... COLLEGETo: Chairman, MSc Project Committee Project for examination in Trinity Term 2012 MSc Computer................................................ PROJECT TITLE

Oxford, University of

436

EEnergy Project "MeRegio" (Smart Grid Project) (Baden-Württemberg...  

Open Energy Info (EERE)

EEnergy Project "MeRegio" (Smart Grid Project) (Baden-Wrttemberg, Germany) Jump to: navigation, search Project Name EEnergy Project "MeRegio" Country Germany Headquarters...

437

A Representation of Projective Space by the Points of a Line  

E-Print Network [OSTI]

fG fW. 1911 (Mathematics) Representation of project ive space by the points o JL i-ii^5 • A REPRESENTATION OF PROJECTIVE SPACE BY THE POINTS OF A LINE. GEORGE TOLLMAN "BESS. A thesis submitted in partial fulfilment of the requirements...-to-one recipro- cal correspondence with the elements of another planar pencil, which may be either a pencil of points on the same line 1 or on a line distinct from 1 or a pencil of planar lines [l 1!. EJLfiSfif 'EfiCiSfifiaiixaiifia. If IF*] and [O1...

Hess, George Wellman

1911-05-01T23:59:59.000Z

438

INVENTORY -EDITED SARA TITLE III TOXIC CHEMICALS Department  

E-Print Network [OSTI]

INVENTORY - EDITED SARA TITLE III TOXIC CHEMICALS Department: Principal Investigator: SARA Reporter) 75-71-8 Dielectric Oil 64742-53-6 Emetine Dihydrochloride 316-42-7 Formaldehyde 50-00-0 Fuel Oil, #2 (Inside) 68476-30-2 Fuel Oil, #4 68476-31-3 Fuel Oil, #4 (Underground) 68476-31-3 Fuel Oil, #6 68553

Entekhabi, Dara

439

CHAPTER III MARINE METEOROLOGY OF THE GULF OF MEXICO  

E-Print Network [OSTI]

CHAPTER III MARINE METEOROLOGY OF THE GULF OF MEXICO #12;Blank page retained for pagination #12;MARINE METEOROLOGY OF THE GULF OF MEXICO, A BRIEF REVIEW 1 By DALE F. LEIPPER, Department oj Oceonography, Agricultural and Mechanical College oj Tuas The best general summary of the weather over the Gulf of Mexico

440

Physiological Insights Towards Improving Fish Culture L. CURRY WOODS III*  

E-Print Network [OSTI]

Physiological Insights Towards Improving Fish Culture L. CURRY WOODS III* Department of Animal, and American Fisheries Society (AFS) Fish Culture Section, was held February 26 through March 2, 2007, in San Antonio, Texas. At this meeting, the AFS Fish Culture and Fish Physiol- ogy Sections co

Hamza, Iqbal

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Officers and Editors for 2011 JOSEPH R. MENDELSON III  

E-Print Network [OSTI]

Officers and Editors for 2011 President JOSEPH R. MENDELSON III Zoo Atlanta Atlanta, GA 30315, USA) Smithsonian Institution, USA TIFFANY DOAN (2014 R) Central Connecticut State Univ., USA PATRICK GREGORY (2012 PATERSON (2012 R) Williams Baptist College, USA JENNIFER PRAMUK (2014 Cons) Woodland Park Zoo, USA CAROL

Galán, Pedro

442

TI 2013-055/III Tinbergen Institute Discussion Paper  

E-Print Network [OSTI]

TI 2013-055/III Tinbergen Institute Discussion Paper Parallel Sequential Monte Carlo for Efficient Density Combination: The Deco Matlab Toolbox Roberto Casarin1 Stefano Grassi2 Francesco Ravazzolo3 Herman Mahlerplein 117 1082 MS Amsterdam The Netherlands Tel.: +31(0)20 525 8579 #12;PARALLEL SEQUENTIAL MONTE CARLO

Chen, Yiling

443

221B Lecture Notes Quantum Field Theory III (Radiation Field)  

E-Print Network [OSTI]

221B Lecture Notes Quantum Field Theory III (Radiation Field) 1 Quantization of Radiation Field Early development of quantum mechanics was led by the fact that electro- magnetic radiation (electric current den- sity) jµ = (, j/c). For a point particle of charge e, the charge density is = e

Murayama, Hitoshi

444

MOST POPULATION III SUPERNOVAE ARE DUDS Robert L. Kurucz  

E-Print Network [OSTI]

the ``dark matter'' halo. Subject headings: supernovae --- dark matter Introduction Most of the physics predictions about dud supernovae and about ``dark matter''. Population III stars, dud supernovae, supernovae and primordial gas into a globular cluster. Model atmosphere calculations for oxygen dwarfs show that water

Kurucz, Robert L.

445

Renewable Energies III Photovoltaics, Solar & Geo-Thermal  

E-Print Network [OSTI]

Renewable Energies III Photovoltaics, Solar & Geo-Thermal 21st August - 2nd September 2011 on the principles of solar energy conversion. Theoretical knowledge will be complemented with practical workshops of solar energy conversion. Theoretical knowledge will be comple- mented with practical workshops

446

The Family of "Circle Limit III" Escher Patterns Douglas Dunham  

E-Print Network [OSTI]

consider the third one of this sequence, Circle Limit III -- a pattern of fish, to be the most beautiful. In this woodcut, four fish meet at right fin tips, three fish meet at left fin tips, and three fish meet at their noses. The backbones of the fish are aligned along white circular arcs. Fish on one arc are the same

Dunham, Doug

447

Updated 5-10 George M. Drakeley III PE  

E-Print Network [OSTI]

national stewardship and workforce development for the Marine Engineering competency. He Develops the workforce and improves readiness. In 1978 Mr. Drakeley began his career as a Nuclear Qualified Officer of Virginia since 1988. He is DAWIA Level III certified in Systems Planning, Research, Development

448

Methods for improved growth of group III nitride buffer layers  

DOE Patents [OSTI]

Methods are disclosed for growing high crystal quality group III-nitride epitaxial layers with advanced multiple buffer layer techniques. In an embodiment, a method includes forming group III-nitride buffer layers that contain aluminum on suitable substrate in a processing chamber of a hydride vapor phase epitaxy processing system. A hydrogen halide or halogen gas is flowing into the growth zone during deposition of buffer layers to suppress homogeneous particle formation. Some combinations of low temperature buffers that contain aluminum (e.g., AlN, AlGaN) and high temperature buffers that contain aluminum (e.g., AlN, AlGaN) may be used to improve crystal quality and morphology of subsequently grown group III-nitride epitaxial layers. The buffer may be deposited on the substrate, or on the surface of another buffer. The additional buffer layers may be added as interlayers in group III-nitride layers (e.g., GaN, AlGaN, AlN).

Melnik, Yurity; Chen, Lu; Kojiri, Hidehiro

2014-07-15T23:59:59.000Z

449

Project Earth Lover  

SciTech Connect (OSTI)

Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

Slobotski, Stephanie,

2011-09-01T23:59:59.000Z

450

The STACEE Project  

E-Print Network [OSTI]

The Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) is a telescope designed to explore the gamma-ray sky between 20 and 250 GeV using the atmospheric Cherenkov technique. STACEE is currently under construction. When completed, it will use 48 large heliostat mirrors at the solar research facility at Sandia National Laboratories (Albuquerque, NM) to reflect Cherenkov light created in gamma-ray air showers to secondary mirrors on a central tower. The secondary mirrors image this light onto photomultiplier tube cameras. This paper provides an overview of the STACEE project, including a description of the experimental site and an outline of the current design for the detector components.

Ong, R A; Ong, Rene A.; Covault, Corbin E.

1997-01-01T23:59:59.000Z

451

The STACEE Project  

E-Print Network [OSTI]

The Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) is a telescope designed to explore the gamma-ray sky between 20 and 250 GeV using the atmospheric Cherenkov technique. STACEE is currently under construction. When completed, it will use 48 large heliostat mirrors at the solar research facility at Sandia National Laboratories (Albuquerque, NM) to reflect Cherenkov light created in gamma-ray air showers to secondary mirrors on a central tower. The secondary mirrors image this light onto photomultiplier tube cameras. This paper provides an overview of the STACEE project, including a description of the experimental site and an outline of the current design for the detector components.

Rene A. Ong; Corbin E. Covault

1997-11-25T23:59:59.000Z

452

NDLGS project update  

SciTech Connect (OSTI)

Recent results for laser and ESD processing for the NDLGS project will be reviewed. Conclusions are: (1) Short mix passes have profound effect on window T; (2) Multiple drill and re-weld at single location has been shown to be feasible and successful; (3) Kapton beam profiling method has been successfully developed. Comparison of 100 mm and 120 mm lenses gives reasonable and consistent results; (4) Manifold pumpdown data has been presented; (5) ESO results can be accurately predicted once a repeatable efficiency has been established; and (6) The electrode-workpiece geometry may play an important on ESO efficiency. Experiments are planned to investigate these effects.

Lienert, Thomas J [Los Alamos National Laboratory; Sutton, Jacob O [Los Alamos National Laboratory; Piltch, Martin S [Los Alamos National Laboratory; Lujan, Dennis J [Los Alamos National Laboratory

2011-01-14T23:59:59.000Z

453

GM Team Project  

E-Print Network [OSTI]

) Incorporate weather data into database 4) Estimate paint shop energy usage Project Objectives ESL-IE-14-05-05 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New Orleans, LA. May 20-23, 2014 Psychrometric Charts 101 ? Psychrometrics... of the Thrity-Sixth Industrial Energy Technology Conference New Orleans, LA. May 20-23, 2014 Defining Paths Region Step 1?2 Step 2? 3 Step 3? 4 A Sensible Heating Evaporative Cooling B Evaporative Cooling Sensible Cooling C Sensible Cooling Latent Cooling...

Deng, J.; Laveman, J.; MacAdam, K.; Kunyao, Y.

2014-01-01T23:59:59.000Z

454

CLIC Project Overview  

ScienceCinema (OSTI)

The CLIC study is exploring the scheme for an electron-positron collider with a centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The current goal of the project is to demonstrate the feasibility of the technology by the year 2010. Recently, important progress has been made concerning the high-gradient accelerating structure tests and the experiments with beam in the CLIC test facility, CTF3. On the organizational side, the CLIC international collaborations have significantly gained momentum, boosting the CLIC study.

Andrea Latina

2010-01-08T23:59:59.000Z

455

Rabbit Project Reference Manual  

E-Print Network [OSTI]

breed or produc- tion standards whenever possible to 4-H mem- bers or other people wishing to raise rabbits. You might sell fryers live to commercial rab- bit processors or to laboratory animal suppli- ers. Or, dress and sell the fryers to friends, rela... or more litters are raised. Offspring are sold for breed stock and show animals. Members should also market the young. Members are encouraged to use pure- bred commercial breeds for this project, al- though crossbred rabbits are acceptable. Mem- bers must...

Wootton, Chad

2000-05-04T23:59:59.000Z

456

Project Management Practices  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | Department ofThatGrid3 ProgramID Project Name

457

Project Submission Template  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergyProject

458

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and Project Management

459

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and Project

460

The Materials Project:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2 and NbSe2DifferentTheInforumLastProject: computing and

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Renewable Northwest Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORV 15051SoilWind Energy Wind Northwest Project

462

Infrastructure Projects | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land Surface Emissivity in the Vicinity of theInfrastructure Projects

463

Sandia National Laboratories: Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik SpoerkeSolar Regional Test Center inInsightsPrattProject Organization

464

CNEEC - Research Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearchCASL Symposium: CelebratingMission Welcome to theProjects CNEEC

465

Rooftop Unit Network Project  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l LPROJECTS IN7 Roadmap for Bioenergy and BiobasedofHow TheNetwork Project

466

NREL: Geothermal Technologies - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions and Achievements ofLiz TorresSolectria Photo of twoCapabilitiesProjects

467

Midwest Energy Codes Project  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOE TribaltheMy nameMid-LevelMidwest Energy Codes Project 2014

468

Project Flow.qxp  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject Cost

469

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

SciTech Connect (OSTI)

This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (v) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter continued to be focused on the following: Concluding the Negotiation and completing Contracts among Stakeholders of the Team; Revision of Final Report for Phase I; Engineering Design Progress; Selection of Systems Associates, Inc. for design of Control System; Conclusion of Secrecy Agreement with Carborundum (St. Gobain); and Permitting Work and Revisions.

Albert Calderon

2000-03-22T23:59:59.000Z

470

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

SciTech Connect (OSTI)

This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (iv) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (v) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter continued to be focused on the following: Concluding the Negotiation and completing Contracts among Stakeholders of the Team; Revision of Final Report for Phase I; Engineering Design Progress; Selection of Systems Associates, Inc. for design of Control System; Conclusion of Secrecy Agreement with Carborundum (St. Gobain); and Permitting Work and Revisions.

Albert Calderon

2000-06-21T23:59:59.000Z

471

The Formation of Constellation III in the Large Magellanic Cloud  

E-Print Network [OSTI]

We present a detailed reconstruction of the star-formation history of the Constellation III region in the Large Magellanic Cloud, to constrain the formation mechanism of this enigmatic feature. Star formation in Constellation III seems to have taken place during two distinct epochs: there is the 8-15 Myr epoch that had previously been recognized, but we also see strong evidence for a separate "burst" of star formation 25-30 Myr ago. The "super-supernova" or GRB blast wave model for the formation of Constellation III is difficult to reconcile with such an extended, two-epoch star formation history, because the shock wave should have induced star formation throughout the structure simultaneously, and any unconsumed gas would quickly be dissipated, leaving nothing from which to form a subsequent burst of activity. We propose a "truly stochastic" self-propagating star formation model, distinct from the canonical model in which star formation proceeds in a radially-directed wave from the center of Constellation III to its perimeter. As others have noted, and we now confirm, the bulk age gradients demanded by such a model are simply not present in Constellation III. In our scenario, the prestellar gas is somehow pushed into these large-scale arc structures, without simultaneously triggering immediate and violent star formation throughout the structure. Rather, star formation proceeds in the arc according to the local physical conditions of the gas. Self-propagating star formation is certainly possible, but in a truly stochastic manner, without a directed, large scale pattern.

Jason Harris; Dennis Zaritsky

2007-12-13T23:59:59.000Z

472

Device Oriented Project Controller  

SciTech Connect (OSTI)

This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

Dalesio, Leo; Kraimer, Martin

2013-11-20T23:59:59.000Z

473

Lemnos interoperable security project.  

SciTech Connect (OSTI)

With the Lemnos framework, interoperability of control security equipment is straightforward. To obtain interoperability between proprietary security appliance units, one or both vendors must now write cumbersome 'translation code.' If one party changes something, the translation code 'breaks.' The Lemnos project is developing and testing a framework that uses widely available security functions and protocols like IPsec - to form a secure communications channel - and Syslog, to exchange security log messages. Using this model, security appliances from two or more different vendors can clearly and securely exchange information, helping to better protect the total system. Simplify regulatory compliance in a complicated security environment by leveraging the Lemnos framework. As an electric utility, are you struggling to implement the NERC CIP standards and other regulations? Are you weighing the misery of multiple management interfaces against committing to a ubiquitous single-vendor solution? When vendors build their security appliances to interoperate using the Lemnos framework, it becomes practical to match best-of-breed offerings from an assortment of vendors to your specific control systems needs. The Lemnos project is developing and testing a framework that uses widely available open-source security functions and protocols like IPsec and Syslog to create a secure communications channel between appliances in order to exchange security data.

Halbgewachs, Ronald D.

2010-03-01T23:59:59.000Z

474

Projection optics box  

DOE Patents [OSTI]

A projection optics box or assembly for use in an optical assembly, such as in an extreme ultraviolet lithography (EUVL) system using 10-14 nm soft x-ray photons. The projection optics box utilizes a plurality of highly reflective optics or mirrors, each mounted on a precision actuator, and which reflects an optical image, such as from a mask, in the EUVL system onto a point of use, such as a target or silicon wafer, the mask, for example, receiving an optical signal from a source assembly, such as a developed from laser system, via a series of highly reflective mirrors of the EUVL system. The plurality of highly reflective optics or mirrors are mounted in a housing assembly comprised of a series of bulkheads having wall members secured together to form a unit construction of maximum rigidity. Due to the precision actuators, the mirrors must be positioned precisely and remotely in tip, tilt, and piston (three degrees of freedom), while also providing exact constraint.

Hale, Layton C. (Livermore, CA); Malsbury, Terry (Tracy, CA); Hudyma, Russell M. (San Ramon, CA); Parker, John M. (Tracy, CA)

2000-01-01T23:59:59.000Z

475

DOE Energy Challenge Project  

SciTech Connect (OSTI)

Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOE’s interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

Frank Murray; Michael Schaepe

2009-04-24T23:59:59.000Z

476

Project Management Guide | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Management Guide Project Management Guide The purpose of this document is to present an overview of project management processes that can be consistently and repeatably...

477

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking...  

Office of Environmental Management (EM)

Project Tracking Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist The following checklist is intended to provide system owners, project...

478

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...  

Broader source: Energy.gov (indexed) [DOE]

PROGRAM: Project Planning Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning Checklist The following checklist is intended to provide system owners, project...

479

Preparing for Project Implementation Assigning Accountability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assigning Accountability for Each Project, April 14, 2010 Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010 Assigning Accountability...

480

Independent Oversight Assessment, Idaho Cleanup Project Sodium...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This...

Note: This page contains sample records for the topic "gred iii project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Infrastructure and Operations Improvement Project Director |...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project risks. -Ensure that required and effective project management and control systems are developed, deployed and implemented to successfully manage and assess the project...

482

Independent Activity Report, Hanford Sludge Treatment Project...  

Broader source: Energy.gov (indexed) [DOE]

Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational...

483

Kinter -Abridged Resume -Updated December 2007 -1 JAMES L. KINTER III  

E-Print Network [OSTI]

Kinter - Abridged Resume - Updated December 2007 - 1 JAMES L. KINTER III Center for Ocean, F. Giorgi, P. Hudson, J. Kinter III, M. Rodriguez- Arias, & N. Stenseth, 2007: Climate chan

Klinger, Barry

484

Kinetics of Reduction of Fe(III) Complexes by Outer Membrane...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fe(III) Complexes by Outer Membrane Cytochromes MtrC and OmcA of Shewanella oneidensis MR-1. Kinetics of Reduction of Fe(III) Complexes by Outer Membrane Cytochromes MtrC and OmcA...

485

E-Print Network 3.0 - advanced stage iii Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

embryo(G1,G2) Unnatural advancement... , Tokyo, Japan 1412 x zy Syringes Heater- Chiller plates Hot Cold Heat exchangeri) ii) iii) iv) v) vi) A i... ) ii) iii) iv) v) vi) A A...

486

Chronopotentiometry of Sm(II) and Pm(III) in molten LiCl-KCl eutectic.  

E-Print Network [OSTI]

??Samarium (III) and promethium (III) were studied by chronopotentiometry in a molten LiCl-KC1 eutectic. Tungsten electrodes were used to avoid alloying effects encountered with platinum… (more)

Nixon, Richard Allen

1966-01-01T23:59:59.000Z

487

Comparing directed efficiency of III-nitride nanowire light-emitting diodes  

E-Print Network [OSTI]

III-nitride-based nanowires are a promising platform for solid-state lighting. III-nitride nanowires that act as natural waveguides to enhance directed extraction have previously been shown to be free of extended defects ...

Gradecak, Silvija

488

The Methanol Economy Project  

SciTech Connect (OSTI)

The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO{sub 2} capture using supported amines, co-electrolysis of CO{sub 2} and water to formate and syngas, decomposition of formate to CO{sub 2} and H{sub 2}, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields. ? Direct electrophilic bromination of methane to methyl bromide followed by hydrolysis to yield methanol was investigated on a wide variety of catalyst systems, but hydrolysis proved impractical for large-scale industrial application. ? Bireforming the correct ratio of methane, CO{sub 2}, and water on a NiO / MgO catalyst yielded the right proportion of H{sub 2}:CO (2:1) and proved to be stable for at least 250 hours of operation at 400 psi (28 atm). ? CO{sub 2} capture utilizing supported polyethyleneimines yielded a system capable of adsorbing CO{sub 2} from the air and release at nominal temperatures with negligible amine leaching. ? CO{sub 2} electrolysis to formate and syngas showed considerable increases in rate and selectivity by performing the reaction in a high pressure flow electrolyzer. ? Formic acid was shown to decompose selectively to CO{sub 2} and H{sub 2} using either Ru or Ir based homogeneous catalysts. ? Direct formic acid fuel cells were also investigated and showed higher than 40% voltage efficiency using reduced loadings of precious metals. A technoeconomic analysis was conducted to assess the viability of taking each of these processes to the industrial scale by applying the data gathered during the experiments to approximations based on currently used industrial processes. Several of these processes show significant promise for industrial scale up and use towards improving our nation’s energy independence.

Olah, George; Prakash, G.K.

2013-12-31T23:59:59.000Z

489

CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Estimated Project End Date  

E-Print Network [OSTI]

CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Phone Numbers: Project Manager: Field Representative: SHEST Representative: List of Hazardous Materials: Estimated Project End Date: Contractor/Service Subcontractor Name: Contractor/Service Subcontractor Address

Pennycook, Steve

490

Oilfield Flare Gas Electricity Systems (OFFGASES Project)  

SciTech Connect (OSTI)

The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas that is only 4% the strength of natural gas. The cost of producing oil is to a large extent the cost of electric power used to extract and deliver the oil. Researchers have identified stranded and flared gas in California that could generate 400 megawatts of power, and believe that there is at least an additional 2,000 megawatts that have not been identified. Since California accounts for about 14.5% of the total domestic oil production, it is reasonable to assume that about 16,500 megawatts could be generated throughout the United States. This power could restore the cost-effectiveness of thousands of oil wells, increasing oil production by millions of barrels a year, while reducing emissions and greenhouse gas emissions by burning the gas in clean distributed generators rather than flaring or venting the stranded gases. Most turbines and engines are designed for standardized, high-quality gas. However, emerging technologies such as microturbines have increased the options for a broader range of fuels. By demonstrating practical means to consume the four gas streams, the project showed that any gases whose properties are between the extreme conditions also could be utilized. The economics of doing so depends on factors such as the value of additional oil recovered, the price of electricity produced, and the alternate costs to dispose of stranded gas.

Rachel Henderson; Robert Fickes

2007-12-31T23:59:59.000Z

491

INL Results for Phases I and III of the OECD/NEA MHTGR-350 Benchmark  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Methods Core Simulation group led the construction of the Organization for Economic Cooperation and Development (OECD) Modular High Temperature Reactor (MHTGR) 350 MW benchmark for comparing and evaluating prismatic VHTR analysis codes. The benchmark is sponsored by the OECD's Nuclear Energy Agency (NEA), and the project will yield a set of reference steady-state, transient, and lattice depletion problems that can be used by the Department of Energy (DOE), the Nuclear Regulatory Commission (NRC), and vendors to assess their code suits. The Methods group is responsible for defining the benchmark specifications, leading the data collection and comparison activities, and chairing the annual technical workshops. This report summarizes the latest INL results for Phase I (steady state) and Phase III (lattice depletion) of the benchmark. The INSTANT, Pronghorn and RattleSnake codes were used for the standalone core neutronics modeling of Exercise 1, and the results obtained from these codes are compared in Section 4. Exercise 2 of Phase I requires the standalone steady-state thermal fluids modeling of the MHTGR-350 design, and the results for the systems code RELAP5-3D are discussed in Section 5. The coupled neutronics and thermal fluids steady-state solution for Exercise 3 are reported in Section 6, utilizing the newly developed Parallel and Highly Innovative Simulation for INL Code System (PHISICS)/RELAP5-3D code suit. Finally, the lattice depletion models and results obtained for Phase III are compared in Section 7. The MHTGR-350 benchmark proved to be a challenging simulation set of problems to model accurately, and even with the simplifications introduced in the benchmark specification this activity is an important step in the code-to-code verification of modern prismatic VHTR codes. A final OECD/NEA comparison report will compare the Phase I and III results of all other international participants in 2014, while the remaining Phase II transient case results will be reported in 2015.

Gerhard Strydom; Javier Ortensi; Sonat Sen; Hans Hammer

2013-09-01T23:59:59.000Z

492

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009  

E-Print Network [OSTI]

from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

Barbose, Galen

2011-01-01T23:59:59.000Z

493

Nanowire-templated lateral epitaxial growth of non-polar group III nitrides  

DOE Patents [OSTI]

A method for growing high quality, nonpolar Group III nitrides using lateral growth from Group III nitride nanowires. The method of nanowire-templated lateral epitaxial growth (NTLEG) employs crystallographically aligned, substantially vertical Group III nitride nanowire arrays grown by metal-catalyzed metal-organic chemical vapor deposition (MOCVD) as templates for the lateral growth and coalescence of virtually crack-free Group III nitride films. This method requires no patterning or separate nitride growth step.

Wang, George T. (Albuquerque, NM); Li, Qiming (Albuquerque, NM); Creighton, J. Randall (Albuquerque, NM)

2010-03-02T23:59:59.000Z

494

Developing Government Renewable Energy Projects  

SciTech Connect (OSTI)

The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

2012-07-01T23:59:59.000Z

495

Ribosomal Database Project II  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The Ribosomal Database Project (RDP) provides ribosome related data and services to the scientific community, including online data analysis and aligned and annotated Bacterial small-subunit 16S rRNA sequences. As of March 2008, RDP Release 10 is available and currently (August 2009) contains 1,074,075 aligned 16S rRNA sequences. Data that can be downloaded include zipped GenBank and FASTA alignment files, a histogram (in Excel) of the number of RDP sequences spanning each base position, data in the Functional Gene Pipeline Repository, and various user submitted data. The RDP-II website also provides numerous analysis tools.[From the RDP-II home page at http://rdp.cme.msu.edu/index.jsp

496

The Biocatalytic Desulfurization Project  

SciTech Connect (OSTI)

The material in this report summarizes the Diversa technical effort in development of a biocatalyst for the biodesulfurization of Petro Star diesel as well as an economic report of standalone and combined desulfurization options, prepared by Pelorus and Anvil, to support and inform the development of a commercially viable process. We will discuss goals of the projected as originally stated and their modification as guided by parallel efforts to evaluate commercialization economics and process parameters. We describe efforts to identify novel genes and hosts for the generation of an optimal biocatalyst, analysis of diesel fuels (untreated, chemically oxidized and hydrotreated) for organosulfur compound composition and directed evolution of enzymes central to the biodesulfurization pathway to optimize properties important for their use in a biocatalyst. Finally we will summarize the challenges and issues that are central to successful development of a viable biodesulfurization process.

David Nunn; James Boltz; Philip M. DiGrazia; Larry Nace

2006-03-03T23:59:59.000Z

497

Breckinridge Project, initial effort  

SciTech Connect (OSTI)

The project cogeneration plant supplies electric power, process steam and treated boiler feedwater for use by the project plants. The plant consists of multiple turbine generators and steam generators connected to a common main steam header. The major plant systems which are required to produce steam, electrical power and treated feedwater are discussed individually. The systems are: steam, steam generator, steam generator fuel, condensate and feedwater deaeration, condensate and blowdown collection, cooling water, boiler feedwater treatment, coal handling, ash handling (fly ash and bottom ash), electrical, and control system. The plant description is based on the Phase Zero design basis established for Plant 31 in July of 1980 and the steam/condensate balance as presented on Drawing 31-E-B-1. Updating of steam requirements as more refined process information becomes available has generated some changes in the steam balance. Boiler operation with these updated requirements is reflected on Drawing 31-D-B-1A. The major impact of updating has been that less 600 psig steam generated within the process units requires more extraction steam from the turbine generators to close the 600 psig steam balance. Since the 900 psig steam generation from the boilers was fixed at 1,200,000 lb/hr, the additional extraction steam required to close the 600 psig steam balance decreased the quantity of electrical power available from the turbine generators. In the next phase of engineering work, the production of 600 psig steam will be augmented by increasing convection bank steam generation in the Plant 3 fired heaters by 140,000 to 150,000 lb/hr. This modification will allow full rated power generation from the turbine generators.

none,

1982-01-01T23:59:59.000Z

498

Applicant DOE Award Project Location Project Focus Feasibility...  

Broader source: Energy.gov (indexed) [DOE]

Tribe's acquisition and subsequent operation of the Kerr Hydroelectric project as a wholesale power generation facility. Confederated Tribes of the Colville Reservation 200,000...

499

Applicant DOE Award Project Location Project Focus Feasibility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Authority (THRHA) 898,772 Juneau, AK The project will provide energy assessments, alternative energy monitoring, and energy conservation upgrades for low-income,...

500

The Mesaba Energy Project: Clean Coal Power Initiative, Round 2  

SciTech Connect (OSTI)

The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.

Stone, Richard; Gray, Gordon; Evans, Robert

2014-07-31T23:59:59.000Z