1

EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental  

Broader source: Energy.gov (indexed) [DOE]

3: Grande Ronde Basin Endemic Spring Chinook Salmon 3: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon SUMMARY This EA evaluates the environmental impacts for the U.S. Department of Energy Bonneville Power Administration's proposal to fund a program designed to prevent the extinction and begin the recovery of spring Chinook salmon stocks in the Grande Ronde River Basin in the Upper Grande Ronde River, Lostine River, and Catherine Creek in Northeastern Oregon. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 18, 2003 EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program

2

Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.  

SciTech Connect (OSTI)

The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

McGowan, Vance R.; Powell, Russ M.

1999-05-01T23:59:59.000Z

3

Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

4

Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

5

Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

2001-04-01T23:59:59.000Z

6

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H.

2008-12-30T23:59:59.000Z

7

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H. [Oregon Department of Fish and Wildlife] [Oregon Department of Fish and Wildlife

2009-07-01T23:59:59.000Z

8

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 2002 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2002. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, they are spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, the Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-07-01T23:59:59.000Z

9

Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01)  

Broader source: Energy.gov (indexed) [DOE]

December 18, 2003 December 18, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) Ken Kirkman - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin Project No: 1998-007-03 Location: Union County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW). Description of the Proposed Action: The CTUIR and ODFW propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to

10

Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Planting 31,733 plants along 3.7 stream miles, (4) Establishing 71 new photopoints and retaking 254 existing photopoint pictures; (5) Monitoring stream temperatures at 12 locations on 6 streams; (6) Completing riparian fence, water gap and other maintenance on 100.5 miles of project fences. Since initiation of the project in 1984 over 68.7 miles of anadromous fish bearing streams and 1,933 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance

2003-08-01T23:59:59.000Z

11

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Program, 2000 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2000.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-03-01T23:59:59.000Z

12

Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin, 2007 Annual Report.  

SciTech Connect (OSTI)

This is the ninth annual report for a multi-year project designed to monitor and evaluate supplementation of endemic spring Chinook salmon in Catherine Creek and the upper Grande Ronde River. These two streams historically supported anadromous fish populations that provided significant tribal and non-tribal fisheries, but in recent years, have experienced severe declines in abundance. Conventional and captive broodstock supplementation methods are being used to restore these spring Chinook salmon populations. Spring Chinook salmon populations in Catherine Creek and the upper Grande Ronde River, and other streams in the Snake River Basin have experienced severe declines in abundance over the past two decades (Nehlsen et al. 1991). A supplementation program was initiated in Catherine Creek and the upper Grande Ronde River, incorporating the use of both captive and conventional broodstock methods, in order to prevent extinction in the short term and eventually rebuild populations. The captive broodstock component of the program (BPA Project 199801001) uses natural-origin parr collected by seining and reared to maturity at facilities near Seattle, Washington (Manchester Marine Laboratory) and Hood River, Oregon (Bonneville Hatchery). Spawning occurs at Bonneville Hatchery, and resulting progeny are reared in hatcheries. Shortly before outmigration in the spring, juveniles are transferred to acclimation facilities. After an acclimation period of about 2-4 weeks, volitional release begins. Any juveniles remaining after the volitional release period are forced out. The conventional broodstock component uses returning adults collected at traps near the spawning areas, transported to Lookingglass Hatchery near Elgin, Oregon, held, and later spawned. The resulting progeny are reared, acclimated, and released similar to the captive broodstock component. All progeny released receive one or more marks including a fin (adipose) clip, codedwire tag, PIT tag, or visual implant elastomer tag. The numbers of adults used for conventional broodstock are determined by an agreement among comanagers (Zimmerman and Patterson 2002). Activities for this project focus on two life stages of spring Chinook salmon: juveniles during the migration from freshwater to the ocean and adults during prespawning migration through the end of spawning. Life history, production, and genetics are monitored and used to evaluate program effectiveness.

Boe, Stephen J.; Crump, Carrie A.; Weldert, Rey L. [Confederated Tribes of the Umatilla Indian Reservation

2009-04-10T23:59:59.000Z

13

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

SciTech Connect (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

14

Winning the Future: Grand Ronde Solar Projects Reduce Pollution...  

Office of Environmental Management (EM)

carport. Photo from GRTHA, NREL 31797 Challenge: Situated on nearly 12,000 acres in the heart of Western Oregon's scenic coastal range, the Confederated Tribes of the Grand Ronde...

15

Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs  

Broader source: Energy.gov [DOE]

Challenge: Situated on nearly 12,000 acres in the heart of Western Oregon’s scenic coastal range, the Confederated Tribes of the Grand Ronde Community of Oregon has a strong connection to the earth...

16

Northeast Oregon Hatchery Program Grande Ronde … Imnaha Spring Chinook Hatchery Project  

Broader source: Energy.gov (indexed) [DOE]

Northeast Oregon Hatchery Program Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Final Environmental Impact Statement Bonneville Power Administration July 2004 Northeast Oregon Hatchery Program -- Grande Ronde-Imnaha Spring Chinook Project i Table of Contents Page Chapter 1: Updated Summary and Project Description 1.1 Introduction..............................................................................................................1-1 1.2 Purpose and Need for the Proposed Action .............................................................1-2 1.3 Decisions to be Made and Responsible Officials ....................................................1-3 1.4 Summary of Public Involvement, Consultation, and Coordination.........................1-3

17

Microsoft Word - CX-GrandRonde-Boyer-ImpairmentEmergency-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Jim Semrau Civil Engineer - TEP-TPP-1 Proposed Action: Wood pole replacement PP&A Project No.: 2760 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Structures 4/5 and 4/6 of Bonneville Power Administration's (BPA) 115-kilovolt Grand Ronde-Boyer No. 1 transmission line located in Polk County, Oregon (Willamette Meridian, T6S, R8W, section 8, se ¼ of se ¼). Proposed by: BPA Description of the Proposed Action: BPA proposes to fix two ground impairments between structures 4/5 and 4/6 on the Grand Ronde-Boyer No. 1 line. The impairments are required to be fixed within 30 days of detection due to concerns for public safety. The conductor on a typical

18

DOE/EIS-0340; Grand Ronde … Imnaha Spring Chinook Hatchery Project  

Broader source: Energy.gov (indexed) [DOE]

3 3 NORTHEAST OREGON HATCHERY PROGRAM GRANDE RONDE - IMNAHA SPRING CHINOOK HATCHERY PROJECT DOE/EIS-0340 Draft Environmental Impact Statement Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Draft Environmental Impact Statement (DOE/EIS-0340) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Federal Agencies: U.S. Department of Interior, Fish and Wildlife Service (USFWS); U.S. Department of Commerce, National Oceanic and Atmospheric Administration National Marine Fisheries Service (NOAA Fisheries); U.S. Department of Agriculture, Forest Service Cooperating Tribes: Nez Perce Tribe (NPT), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Cooperating State Agencies: Oregon Department of Fish and Wildlife (ODFW)

19

Geology of the Wallula Gap Area, Washington. [Grande Ronde, Wanapum, and Saddle Mountains basalts  

SciTech Connect (OSTI)

This study focuses on the structure and stratigraphy of an 80-km/sup 2/ area at the southern margin of the Pasco Basin in Wallula Gap. Field stratigraphy, petrography, natural remanent magnetism, and major-element chemistry indicate that the tholeiitic basalt flows of the Wallula Gap area correlate with units of the Grande Ronde, Wanapum, and Saddle Mountains Formations of the Yakima Subgroup of the Columbia River Basalt Group. Flows of the Frenchman Springs, Umatilla, Pomona, Elephant Mountain, and Ice Harbor Mmebers are present in the area. The Frenchman Springs Member exposed in the Wallula Gap is more than 185 m thick and consists of eight to nine flows. Its thickness and possible contemporaneous structural deformation apparently prevented emplacement of both the Roza and Priest Rapids Members at this locality. Structural uplift of the Horse Heaven Hills began prior to extrusion of the Pomona flow. Both the Pomona and Elephant Mountain Members thin and pinch out over the crest of the uplift near Mound Pond. The Ice Harbor flow was apparently confined to the basin north of the Horse Heaven uplift, but an exposure at Mound Pond suggests it flowed through Wallula Gap as an intracanyon flow. The Wallula Gap fault zone trends N65/sup 0/W and can be traced for at least 11 km along the north flank of the Horse Heaven Hills uplift. Where the fault intersects the Olympic-Wallowa Lineament at Van Sycle Canyon 8 km east of Wallula Gap, it is a broad zone of normal faulting, 300 m wide, with as much as 310 m of displacement of the basalt stratigraphy. Two faults occur in the northern portion of Van Sycle Canyon and define a graben trending N45/sup 0/W. A third fault, roughly parallel to the Wallula Gap fault, transects the The Nub and offsets 14 m of Ice Harbor basalt.

Gardner, J.N.; Snow, M.G.; Fecht, K.R.

1981-12-01T23:59:59.000Z

20

DOE/EIS-0340-SA-01: Supplement Analysis for NEOH Grande Ronde-Imnaha Spring Chinook Hatchery Project (03/23/06)  

Broader source: Energy.gov (indexed) [DOE]

3, 2006 3, 2006 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for NEOH Grande Ronde - Imnaha Spring Chinook Hatchery Project (DOE/EIS-0340-SA-01) Ken Kirkman - KEWU-4 Project Manager Proposed Action: Grande Ronde - Imnaha Spring Chinook Hatchery Project Modifications Resulting from Final Design Project No.: 1988-053-01 Location: Wallowa County, Oregon Proposed By: Bonneville Power Administration (BPA) and Nez Perce Tribe Introduction: BPA, in its March 11, 2005 Record of Decision (ROD) on the Grande Ronde - Imnaha Spring Chinook Hatchery Project, decided to fund value engineering, land acquisition and final design of fish production facilities to support an ongoing program of Snake River spring chinook propagation for conservation and recovery of the species. BPA analyzed the

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

GRANDE RONDE RIVER BASIN FISH HABITAT IMPROVEMENT IMPLEMENTATION PLAN  

E-Print Network [OSTI]

Oregon Department of Fish and Wildlife Kathy Anderson U.S. Department of Energy Bonneville Power Administration #12;CONTENTS ABSTRACT . . . . . · · . . · . . . . . . i INTRODUCTION

22

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

23

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

24

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

25

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

26

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program; Satellite Facilities Operation and Maintenance, 2005 Annual Report.  

SciTech Connect (OSTI)

There were 2 acclimation periods at the Catherine Creek Acclimation Facility (CCAF) in 2005. During the early acclimation period, 130,748 smolts were delivered from Lookingglass Hatchery (LGH) on 7 March. This group contained progeny of both the captive (53%) and conventional broodstock programs. The size of the fish at delivery was 23.9 fish/lb. Volitional releases began 14 March 2005 and ended 27 March with an estimated total (based on PIT tag detections of 3,187) of 29,402 fish leaving the raceways. This was 22.5% of the total fish delivered. Fish remaining in the raceways after volitional release were forced out. Hourly detections of PIT-tagged fish showed that most of the fish left around 1900 hours. The size of the fish just before the volitional release was 23.9 and the size of the fish remaining just before the forced release was 23.2 fish/lb. The total mortality for the acclimation period was 204 (0.16%). The total number of fish released from the acclimation facility during the early period was 130,544. During the second acclimation period 59,100 smolts were delivered from LGH on 28 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 21.8 fish/lb. Volitional releases began 3 April 2005 and ended with a force out emergency release on 7 April. The size of the fish just before the volitional release was 21.8. The total mortality for the acclimation period was 64 (0.11 %). The total number of fish released from the acclimation facility during the late period was 59,036. There was only 1 planned acclimation period at the Upper Grande Ronde Acclimation Facility (UGRAF) in 2005. During the early acclimation period 105,418 smolts were delivered from LGH on 8 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 21.0 fish/lb. There was no volitional release in 2005 due to freezing air and water conditions prompting an early release. The total mortality for the acclimation period was 49 (0.05 %). The total number of fish released from the acclimation facility during the late period was 105,369. Maintenance and repair activities were conducted at the acclimation facilities in 2005. Facility maintenance work consisted of snow removal, installation of drainage lines, removal of gravel from intake area, installation of new gate at the CCAF, and complete overhaul of 2 travel trailers. The Catherine Creek Adult Capture Facility (CCACF) was put into operation on 11 February 2005. The first adult summer steelhead was captured on 4 March. A total of 190 adult summer steelhead were trapped and released from 4 March to 16 May 2005. Peak arrival at the trap was the week of 8 April. The first adult spring Chinook salmon was captured at CCACF on 6 May 2005. A total of 226 spring Chinook salmon were trapped from 6 May to 8 July 2005. There were 56 adults and 4 jacks unmarked and 136 adult and 30 jack marked spring Chinook salmon trapped. Peak arrival at the trap was the week of 10 June for the unmarked and marked fish. None of the captive broodstock returns were collected for broodstock. Broodstock was collected systematically over the entire return from 31 May to 6 July 2005. Ten of the 34 broodstock collected and transported from CCACF to LGH were unmarked fish trapped. About 18% of the naturally produced adult males and females trapped were taken to LGH for broodstock. One jack was collected for every 5 adult males that were taken to LGH. A total of 30 age 4 and 5 and 4 age 3 fish were transported to LGH for broodstock. The hatchery component of the broodstock was 66.7%. Five weekly spawning surveys were conducted below the weir on Catherine Creek beginning 30 June 2005. During these surveys no live or dead fish were observed. The trap was removed from Catherine Creek on 3 August 2005. Temperatures at the CCACF ranged from -0.1 C on 14 February to 23.7 C on 21 July. The hourly temperatures at the adult trap during the period of operation showed that the lowest water temperatures

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2006-01-01T23:59:59.000Z

27

Texas Legislative and Irrigation Districts of the Rio Grande River Basin: A Map Series  

E-Print Network [OSTI]

The title of this map series is Texas Legislative and Irrigation Districts of the Rio Grande River Basin. The series consists of nine (9) maps showing the boundaries of legislative districts and 32 water districts that deliver irrigation water...

Leigh, Eric; Fipps, G.

28

Don't let the river run dry: Efficiency and conservation efforts in the Rio Grande Basin  

E-Print Network [OSTI]

the project. This team works with local irrigation districts, agricultural producers, homeowners, and other state and federal agencies to address the various water issues in the basin. ?The Rio Grande Basin Initiative is a model outcome- based program... the project. This team works with local irrigation districts, agricultural producers, homeowners, and other state and federal agencies to address the various water issues in the basin. ?The Rio Grande Basin Initiative is a model outcome- based program...

Supercinski, Danielle

2011-01-01T23:59:59.000Z

29

Don't let the river run dry: Efficiency and conservation efforts in the Rio Grande Basin  

E-Print Network [OSTI]

the project. This team works with local irrigation districts, agricultural producers, homeowners, and other state and federal agencies to address the various water issues in the basin. ?The Rio Grande Basin Initiative is a model outcome- based program... the project. This team works with local irrigation districts, agricultural producers, homeowners, and other state and federal agencies to address the various water issues in the basin. ?The Rio Grande Basin Initiative is a model outcome- based program...

Supercinski, Danielle

2010-01-01T23:59:59.000Z

30

Grande  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke...

31

A Coupled Modeling System to Simulate Water Resources in the Rio Grande Basin  

SciTech Connect (OSTI)

Limited availability of fresh water in arid and semi-arid regions of the world requires prudent management strategies from accurate, science-based assessments. These assessments demand a thorough understanding of the hydrologic cycle over long time periods within the individual water-sheds that comprise large river basins. Measurement and simulation of the hydrologic cycle is a tremendous challenge, involving a coupling between global to regional-scale atmospheric precipitation processes with regional to local-scale land surface and subsurface water transport. Los Alamos National Laboratory is developing a detailed modeling system of the hydrologic cycle and applying this tool at high resolution to assess the water balance within the upper Rio Grande river basin. The Rio Grande is a prime example of a river system in a semiarid environment, with a high demand from agricultural, industrial, recreational, and municipal interests for its water supply. Within this river basin, groundwater supplies often augment surface water. With increasing growth projected throughout the river basin, however, these multiple water users have the potential to significantly deplete groundwater resources, thereby increasing the dependence on surface water resources.

Bossert, J.E.; Breshears, D.D.; Campbell, K.; Costigan, K.R.; Greene, R.K.; Keating, E.H.; Kleifgen, L.M.; Langley, D.L.; Martens, S.N.; Sanderson, J.G.; Springer, E.P.; Stalker, J.R.; Tartakovsky, D.M.; Winter, C.L.; Zyvoloski, G.A.

1999-01-11T23:59:59.000Z

32

SECONDARY MINERALS FOUND IN CORES DC2 Al AND DC2 TAKEN FROM THE GRANDE RONDE BASALT FORMATION, PASCO BASIN, WASHINGTON  

E-Print Network [OSTI]

Fiscal Year 1980 for Rockwell Hanford Operations of Rockwell1. Ames, L. L. , 1976. Hanford basalt flow mineralogy.report to the Rockwell Hanford Operations Office of North

Teague, L.S.

2010-01-01T23:59:59.000Z

33

A Study of the Effects of Institutions on the Distribution and use of Water for Irrigation in the Lower Rio Grande Basin  

E-Print Network [OSTI]

Water users in the Lower Rio Grande Basin of Texas have depended on the flow of the Rio Grande to supply water for agricultural as well as municipal and industrial purposes. Although the area is a major agricultural production region, it faces...

Gray, R. M.; Trock, W. L.

34

2010 Mid Year Conference Spirit Mountain Resort, Grand Ronde, OR  

E-Print Network [OSTI]

Indians in the states of Washington, Idaho, Oregon, Montana, Nevada, Northern California, and Alaska Indians; and WHEREAS, informed communities and improved scientific understanding of estuaries and coasts scientific and technical expertise, as they evaluate and/or implement economic activities based on ocean

35

2010 Mid-Year Conference Grand Ronde, Oregon  

E-Print Network [OSTI]

of American Indians/Alaska Natives in the states of Washington, Idaho, Oregon, Montana, Nevada, Northern; and WHEREAS, informed communities and improved scientific understanding of estuaries and coasts are essential access of the Tribes to specialized scientific and technical expertise, as they evaluate and/or implement

36

Effects of the Arundo donax L. on Hydrological Regime of the Rio Grande Basin  

E-Print Network [OSTI]

This study investigated the role of an invasive tall cane, Arundo donax L. (Arundo), in the riparian water cycle. Four 100 meter transects were arrayed perpendicular to the lower Rio Grande in southwest Texas. The first objective was to determine...

Li, Fan

2012-07-16T23:59:59.000Z

37

Potential Water Savings in Irrigated Agriculture in the Lower Rio Grande Basin of Texas  

E-Print Network [OSTI]

This report was completed for the Senate Bill 1 Rio Grande Regional Water Planning Project (Region M) by the District Management System (DMS) team under the direction of Dr. Guy Fipps. Funding was provided through the Texas Agricultural Experiment...

Fipps, Guy

2001-08-01T23:59:59.000Z

38

The ending of an era: After more than 10 years, the Rio Grande Basin Initiative concludes  

E-Print Network [OSTI]

available for the people of the basin, Lacewell said. In addition, desalination use in South Texas has grown and become competitive with municipal water production. Project sponsor NIFA o#17;en uses data produced through RGBI because it is broad... available for the people of the basin, Lacewell said. In addition, desalination use in South Texas has grown and become competitive with municipal water production. Project sponsor NIFA o#17;en uses data produced through RGBI because it is broad...

Kalisek, Danielle

2013-01-01T23:59:59.000Z

39

Rate of deformation in the Pasco Basin during the Miocene as determined by distribution of Columbia River basalt flows  

SciTech Connect (OSTI)

Detailed mapping of over 8000 square kilometers and logs from 20 core holes were used to determine the distribution and thickness of basalt flows and interbeds in the Pasco Basin. The data indicate the high-MgO Grande Ronde Basalt and Wanapum Basalt thicken from the northeast to the southwest. Deformation began in late Frenchman Springs time in the Saddle Mountains along a northwest-southeast trend and in Roza time along an east-west trend. By late Wanapum time, basalt flows were more restricted on the east side. Saddle Mountains Basalt flows spread out in the basin from narrow channels to the east. The Umatilla Member entered from the southeast and is confined to the south-central basin, while the Wilbur Creek, Asotin, Esquatzel, Pomona, and Elephant Mountain Members entered from the east and northeast. The distribution of these members is controlled by flow volume, boundaries of other flows, and developing ridges. The Wilbur Creek, Asotin, and Esquatzel flows exited from the basin in a channel along the northern margin of the Umatilla flow, while the Pomona and Elephant Mountain flows exited between Umtanum Ridge and Wallula Gap. The thickness of sedimentary interbeds and basalt flows indicated subsidence and/or uplift began in post-Grande Ronde time (14.5 million years before present) and continued through Saddle Mountains time (10.5 million years before present). Maximum subsidence occurred 40 kilometers (24 miles) north of Richland, Washington with an approximate rate of 25 meters (81 feet) per million years during the eruption of the basalt. Maximum uplift along the developing ridges was 70 meters (230 feet) per million years.

Reidel, S.P.; Ledgerwood, R.K.; Myers, C.W.; Jones, M.G.; Landon, R.D.

1980-03-01T23:59:59.000Z

40

Evaluation of geothermal potential of Rio Grande rift and Basin and Range province, New Mexico. Final technical report, January 1, 1977-May 31, 1978  

SciTech Connect (OSTI)

A study was made of the geological, geochemical and geophysical characteristics of potential geothermal areas in the Rio Grande rift and Basin and Range province of New Mexico. Both regional and site-specific information is presented. Data was collected by: (1) reconnaissance and detailed geologic mapping, emphasizing Neogene stratigraphy and structure; (2) petrologic studies of Neogene igneous rocks; (3) radiometric age-dating; (4) geochemical surveying, including regional and site-specific water chemistry, stable isotopic analyses of thermal waters, whole-rock and mineral isotopic studies, and whole-rock chemical analyses; and (5) detailed geophysical surveys, using electrical, gravity and magnetic techniques, with electrical resistivity playing a major role. Regional geochemical water studies were conducted for the whole state. Integrated site-specific studies included the Animas Valley, Las Cruces area (Radium Springs and Las Alturas Estates), Truth or Consequences region, the Albuquerque basin, the San Ysidro area, and the Abiquiu-Ojo Caliente region. The Animas Valley and Las Cruces areas have the most significant geothermal potential of the areas studied. The Truth or Consequences and Albuquerque areas need further study. The San Ysidro and Abiquiu-Ojo Caliente regions have less significant geothermal potential. 78 figs., 16 tabs.

Callender, J.F.

1985-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Chattanooga Eagle Ford Rio Grande Embayment Texas- Louisiana-  

U.S. Energy Information Administration (EIA) Indexed Site

Rio Grande Rio Grande Embayment Texas- Louisiana- Mississippi Salt Basin Uinta Basin Appa lachia n Basin Utica Marcellus Devonian (Ohio) Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville Hermosa Mancos Pierre Conasauga Woodford- Caney Pearsall- Eagle Ford Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Maverick Sub-Basin Montana Thrust Belt Marfa Basin Valley and Ridge Province Arkoma Basin Forest City Basin Piceance Basin Shale Gas Plays, Lower 48 States 0 200 400 100 300 Miles ± Source: Energy Information Administration based on data from various published studies

42

Salmonid Gamete Preservation in the Snake River Basin : 2000 Annual Report.  

SciTech Connect (OSTI)

Steelhead (Oncorhynchus mykiss) and chinook salmon (Oncorhynchus tshawytscha) populations in the Northwest are decreasing. Genetic diversity is being lost at an alarming rate. The Nez Perce Tribe (Tribe) strives to ensure availability of genetic samples of the existing male salmonid population by establishing and maintaining a germplasm repository. The sampling strategy, initiated in 1992, has been to collect and preserve male salmon and steelhead genetic diversity across the geographic landscape by sampling within the major river subbasins in the Snake River basin, assuming a metapopulation structure existed historically. Gamete cryopreservation conserves genetic diversity in a germplasm repository, but is not a recovery action for listed fish species. The Tribe was funded in 2000 by the Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service Lower Snake River Compensation Plan (LSRCP) to coordinate gene banking of male gametes from Endangered Species Act listed steelhead and spring and summer chinook salmon in the Snake River basin. In 2000, a total of 349 viable chinook salmon semen samples from the Lostine River, Catherine Creek, upper Grande Ronde River, Lookingglass Hatchery (Imnaha River stock), Rapid River Hatchery, Lake Creek, the South Fork Salmon River weir, Johnson Creek, Big Creek, Capehorn Creek, Marsh Creek, Pahsimeroi Hatchery, and Sawtooth Hatchery (upper Salmon River stock) were cryopreserved. Also, 283 samples of male steelhead gametes from Dworshak Hatchery, Fish Creek, Grande Ronde River, Imnaha River, Little Sheep Creek, Pahsimeroi Hatchery and Oxbow Hatchery were also cryopreserved. The Tribe acquired 5 frozen steelhead samples from the Selway River collected in 1994 and 15 from Fish Creek sampled in 1993 from the U.S. Geological Survey, for addition into the germplasm repository. Also, 590 cryopreserved samples from the Grande Ronde chinook salmon captive broodstock program are being stored at the University of Idaho as a long-term archive, half of the total samples. A total of 2,420 cryopreserved samples from Snake River basin steelhead and spring and summer chinook salmon, from 1992 through 2000, are stored in two independent locations at the University of Idaho and Washington State University. Two large freezer tanks are located at each university, each of which holds approximately 25% of the cryopreserved sperm. One tank at each university is considered long-term archival storage, while the other is short-term. Fertility trials were conducted at each university to test the viability of the cryopreserved chinook salmon sperm. The experiments on the 2000 frozen and thawed sperm at both universities found a fertility rate of 60-70%. This document also summarizes 1999-2000 steelhead genetic analysis report. The results of mitochondrial, nuclear DNA and microsatellite analysis found differences and shared haplotypes between the stocks of fish sampled for cryopreservation. Recommendations for future gene banking efforts include the need for establishment of a regional genome resource bank, a greater emphasis on cryopreserving wild fish, continued fertility trials, exploring field cryopreservation and genetic analysis on all fish represented in the germplasm repository.

Armstrong, Robyn; Kucera, Paul A. [Nez Perce Tribe. Dept. of Fisheries Resource Management, Lapwai, ID (US)

2001-06-01T23:59:59.000Z

43

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operations and Maintenance, 2004 Annual Report.  

SciTech Connect (OSTI)

There were 2 acclimation periods at the Catherine Creek Acclimation Facility (CCAF) in 2004. During the early acclimation period, 92,475 smolts were delivered from Lookingglass Hatchery (LGH) on 8 March. This group was comprised entirely of progeny from the captive broodstock program. The size of the fish at delivery was 23.1 fish/lb. Volitional releases began 15 March 2004 and ended 22 March with an estimated total (based on PIT tag detections of 1,475) of 8,785 fish leaving the raceways. This was 9.5% of the total fish delivered. Fish remaining in the raceways after volitional release were forced out. Hourly detections of PIT-tagged fish showed that most of the fish left between 1200 and 2000 hours which was similar to the hourly temperature profile. The size of the fish just before the volitional release was 23.1 and the size of the fish remaining just before the forced release was 23.5 fish/lb. The total mortality for the acclimation period was 62 (0.07 %). The total number of fish released from the acclimation facility during the early period was 92,413. During the second acclimation period 70,977 smolts were delivered from LGH on 24 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 23.4 fish/lb. Volitional releases began 30 March 2004 and ended 12 April with an estimated total (based on PIT tag detections of 3,632) of 49,147 fish leaving the raceways. This was 69.2% of the total fish delivered. Fish remaining in the raceways after volitional release were forced out. Hourly detections of PIT-tagged fish showed that most of the fish left between 1200 and 2000 hours which was similar to the hourly temperature profile. The size of the fish just before the volitional release was 23.4 and the size of the fish remaining just before the forced release was 23.9 fish/lb. The total mortality for the acclimation period was 18 (0.03 %). The total number of fish released from the acclimation facility during the late period was 70,959.

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2005-02-01T23:59:59.000Z

44

Savings Along the Rio Grande  

E-Print Network [OSTI]

economics team. This model calculates life-cycle costs of desalination per acre-foot and per thousand gallons. The team designed this model for economic and financial analyses of desalination facilities and the model is broadly applicable across many...- friendly framework for Rio Grande Basin Web sites, adding real-time data, query functions and other data to the water resources database. They are also developing an interactive statewide county mapping system to provide a resource geographic...

Supercinski, Danielle

2007-01-01T23:59:59.000Z

45

Evolution of Irrigation Districts and Operating Institutions: Texas, Lower Rio Grande Valley  

E-Print Network [OSTI]

2002). From El Paso, the Rio Grande serves as the 1,200 mile boundary between the U.S. and the Republic of Mexico, with four Mexican States (i.e., Chihuahua, Coahuila, Nuevo Leon, and Tamaulipas) having the river in common with the State of Texas... Location of the Rio Grande Basin. Source: U.S. Section, IBWC 2002. Legend Outline of Rio Grande Basin boundary Rio Grande River Tributaries 4 FIGURE 2. Detailed Map of the Rio Grande Basin. Source: Freese and Nichols. Legend...

Fernandez, Linda; Robinson, John R.C.; Lacewell, Ronald D.; Rister, M. Edward; Ellis, John R.; Sturdivant, Allen W.; Stubbs, Megan J.

46

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, Annual Report 2003.  

SciTech Connect (OSTI)

Redd counts were used to document the spawning distribution of fall chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2003; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992) and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2003 was funded by the Bonneville Power Administration (Projects 199801003, 199801004, 199403400, 198335003), Idaho Power Company, and Bureau of Land Management.

Garcia, A.P.; Bradbury, S.M.; Arnsberg, B.D.

2004-08-01T23:59:59.000Z

47

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2007 Annual Report.  

SciTech Connect (OSTI)

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.

Garcia, A.P.; Bradbury, S. [U.S. Fish and Wildlife Service; Arnsberg, B.D. [Nez Perce Tribe; Groves, P.A. [Idaho Power Company

2008-11-25T23:59:59.000Z

48

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2005 Annual Report.  

SciTech Connect (OSTI)

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2005; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U.S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2005 was funded by the Bonneville Power Administration and Idaho Power Company.

Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

2006-10-01T23:59:59.000Z

49

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2004 Annual Report.  

SciTech Connect (OSTI)

Redd counts were used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U.S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2004; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2004 was funded by the Bonneville Power Administration, Idaho Power Company, and Bureau of Land Management.

Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

2005-10-01T23:59:59.000Z

50

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, Annual Report 2002.  

SciTech Connect (OSTI)

Redd counts were used to document the spawning distribution of fall chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2001; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992) and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2002 was funded by the Bonneville Power Administration (Projects 1998-01-003 and 1994-03-400) and the Idaho Power Company.

Garcia, Aaron P.; Bradbury, S.M.; Arnsberg, Billy D.

2003-09-01T23:59:59.000Z

51

Ronde tafel  

Science Journals Connector (OSTI)

Wie deze rubriek in het augustusnummer van Maatwerk heeft gelezen, zal zich wellicht herinneren, dat de NVMW het initiatief nam voor een bijeenkomst over de beroepsontwikkeling.

Theo Roes

2005-10-01T23:59:59.000Z

52

EA-1173-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

73-SA-01: Supplement Analysis 73-SA-01: Supplement Analysis EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to take additional data on summer steelhead that are trapped at the existing adult collection weirs on the upper Grande Ronde River and Catherine Creek. Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) (December 2003) More Documents & Publications EA-1173: Final Environmental Assessment EIS-0340: Draft Environmental Impact Statement

53

EIS-0340-SA-01: Supplement Analysis  

Broader source: Energy.gov [DOE]

NE Oregon Grande Ronde-Imnaha Spring Chinook Hatchery Project Grande Ronde - Imnaha Spring Chinook Hatchery Project Modifications Resulting from Final Design

54

Salmonid Gamete Preservation in the Snake River Basin, Annual Report 2002.  

SciTech Connect (OSTI)

In spite of an intensive management effort, chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus mykiss) populations in the Northwest have not recovered and are currently listed as threatened species under the Endangered Species Act. In addition to the loss of diversity from stocks that have already gone extinct, decreased genetic diversity resulting from genetic drift and inbreeding is a major concern. Reduced population and genetic variability diminishes the environmental adaptability of individual species and entire ecological communities. The Nez Perce Tribe (NPT), in cooperation with Washington State University and the University of Idaho, established a germplasm repository in 1992 in order to preserve the remaining salmonid diversity in the region. The germplasm repository provides long-term storage for cryopreserved gametes. Although only male gametes can be cryopreserved, conserving the male component of genetic diversity will maintain future management options for species recovery. NPT efforts have focused on preserving salmon and steelhead gametes from the major river subbasins in the Snake River basin. However, the repository is available for all management agencies to contribute gamete samples from other regions and species. In 2002 a total of 570 viable semen samples were added to the germplasm repository. This included the gametes of 287 chinook salmon from the Lostine River, Catherine Creek, upper Grande Ronde River, Imnaha River (Lookingglass Hatchery), Lake Creek, South Fork Salmon River, Johnson Creek, Big Creek, Capehorn Creek, Marsh Creek, Pahsimeroi River (Pahsimeroi Hatchery), and upper Salmon River (Sawtooth Hatchery) and the gametes of 280 steelhead from the North Fork Clearwater River (Dworshak Hatchery), Fish Creek, Little Sheep Creek, Pahsimeroi River (Pahsimeroi Hatchery) and Snake River (Oxbow Hatchery). In addition, gametes from 60 Yakima River spring chinook and 34 Wenatchee River coho salmon were added to the repository by Washington Department of Fish and Wildlife and Columbia River Intertribal Fish Commission, respectively. To date, a total of 3,928 Columbia River salmon and steelhead gamete samples and three Kootenai River white sturgeon are preserved in the repository. Samples are stored in independent locations at the University of Idaho (UI) and Washington State University (WSU).

Young, William; Kucera, Paul

2003-07-01T23:59:59.000Z

55

Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al.,  

Open Energy Info (EERE)

Morgan, Et Al., Morgan, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Exploration Activity Details Location Rio Grande Rift Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown Notes San Luis Basin (south-central CO) regional study. References Paul Morgan, Peter Barkmann, Charles Kluth, Matthew Sares (2010) Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Retrieved from "http://en.openei.org/w/index.php?title=Data_Acquisition-Manipulation_At_Rio_Grande_Rift_Region_(Morgan,_Et_Al.,_2010)&oldid=401472" Category: Exploration

56

Urban Water Conservation along the Rio Grande  

E-Print Network [OSTI]

Use by Cate- gories in New Mexico Counties, River Basins and Irrigated Acreage in 2000 and the NMOSE An- nual Report. 5,6 Data were derived from water supply or utility companies as opposed to city figures. These numbers may reflect some rural... Urban Water Conservation along the Rio Grande THE TEXAS A&M UNIVERSITY SYSTEM NEW MEXICO STATE UNIVERSITY An Inventory of Water Conservation Programs TR 269 SP 201 Valeen Silvy, 1 Ronald Kaiser, 2 Bruce Lesikar 3 and Craig Runyan...

Silvey, Valeen; Kaiser, Ronald; Lesikar, Bruce; Runyan, Craig

2004-01-01T23:59:59.000Z

57

Evaluation of Geothermal Potential of Rio Grande Rift and Basin...  

Open Energy Info (EERE)

age-dating; 4) geochemical surveying, including regional and site-specific water chemistry , stable isotopic analyses of thermal waters , whole-rock and mineral isotopic...

58

<GrandPrairie>  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grande Praire Wind Farm, O'Neill, NE Grande Praire Wind Farm, O'Neill, NE The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), intends to prepare an environmental impact statement (EIS) on the proposed interconnection of the Grande Prairie Wind Farm (Project) in Holt County, near the city of O'Neill, Nebraska. Grande Prairie Wind, LLC (Grande Prairie), a subsidiary of Midwest Wind Energy Development Group, LLC, has applied to Western to interconnect their proposed Project to Western's power transmission system. Western is issuing this notice to inform the public and interested parties about Western's intent to prepare an EIS, conduct a public scoping process, and invite the public to comment on the scope, proposed action, alternatives, and other issues to be addressed in the EIS.

59

Grand Challenge Portfolio: Driving Innovations in Industrial...  

Broader source: Energy.gov (indexed) [DOE]

Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January...

60

EV Everywhere Grand Challenge Overview Presentation | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI. 2-danielson.pdf More Documents & Publications EV Everywhere Grand Challenge...

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa |  

Open Energy Info (EERE)

Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Details Activities (2) Areas (1) Regions (0) Abstract: The San Luis basin is the largest and deepest basin in the Neogene Rio Grande rift, and has many similarities to the basins of the US Basin and Range Province. It is asymmetric with a displacement of as much as 9 km on its eastern margin, and approximately 6.4 km of sedimentary rocks of late Oligocene or younger age in the deepest portion of the basin. Temperature measurements in shallow wells in the northern basin have an average geothermal gradient of 59.0 ± 11.8°C km-1 (± standard

62

Hydrogen Storage Grand Challenge Centers of Excellence  

Broader source: Energy.gov [DOE]

DOE's Hydrogen Storage Grand Challenge Centers of Excellence and partners, led by NREL, SNL, and LANL

63

EV Everywhere Grand Challenge Overview | Department of Energy  

Office of Environmental Management (EM)

2danielsoncaci.pdf More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Overview EV Everywhere Grand...

64

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

3. Estimated rail transportation rates for coal, basin to state, EIA data 3. Estimated rail transportation rates for coal, basin to state, EIA data Basin Destination State 2008 2009 2010 2008-2010 2009-2010 Northern Appalachian Basin Delaware $28.49 - W W - Northern Appalachian Basin Florida - $38.51 $39.67 - 3.0 Northern Appalachian Basin Georgia - W - - - Northern Appalachian Basin Indiana $20.35 $16.14 $16.64 -9.6 3.1 Northern Appalachian Basin Kentucky - - W - - Northern Appalachian Basin Maryland $19.64 $19.60 $20.41 1.9 4.2 Northern Appalachian Basin Michigan $14.02 $16.13 $16.23 7.6 0.6 Northern Appalachian Basin New Hampshire $43.43 $40.18 $39.62 -4.5 -1.4

65

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

4. Estimated rail transportation rates for coal, basin to state, EIA data 4. Estimated rail transportation rates for coal, basin to state, EIA data Basin Destination State 2008 2009 2010 2008-2010 2009-2010 Northern Appalachian Basin Delaware $26.24 - W W - Northern Appalachian Basin Florida - $35.10 $35.74 - 1.8 Northern Appalachian Basin Georgia - W - - - Northern Appalachian Basin Indiana $18.74 $14.70 $14.99 -10.6 1.9 Northern Appalachian Basin Kentucky - - W - - Northern Appalachian Basin Maryland $18.09 $17.86 $18.39 0.8 3.0 Northern Appalachian Basin Michigan $12.91 $14.70 $14.63 6.4 -0.5 Northern Appalachian Basin New Hampshire $40.00 $36.62 $35.70 -5.5 -2.5

66

EV Everywhere Grand Challenge Blueprint  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A Message from A Message from the Assistant Secretary Every challenge presents an even greater opportunity, and the EV Everywhere Grand Challenge is no exception. The need for clean energy solutions drives the most important economic development race of the 21st century, providing opportunity for America to invent, manufacture, and export clean energy technologies. Recognizing that vehicle electrification is an essential part of our country's "all-of-the above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to be the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years.

67

The Lifetime of Grand Design  

E-Print Network [OSTI]

The lifetime of the structure in grand design spiral galaxies is observationally ill-determined, but is essentially set by how accurately the pattern's rotation can be characterized by a single angular pattern speed. This paper derives a generalized version of the Tremaine-Weinberg method for observationally determining pattern speeds, in which the pattern speed is allowed to vary arbitrarily with radius. The departures of the derived pattern speed from a constant then provides a simple metric of the lifetime of the spiral structure. Application of this method to CO observations of NGC 1068 reveal that the pattern speed of the spiral structure in this galaxy varies rapidly with radius, and that the lifetime of the spiral structure is correspondingly very short. If this result turns out to be common in grand-design spiral galaxies, then these features will have to be viewed as highly transient phenomena.

M. R. Merrifield; R. J. Rand; S. E. Meidt

2005-11-02T23:59:59.000Z

68

Mountain View Grand | Open Energy Information  

Open Energy Info (EERE)

Grand Grand Jump to: navigation, search Name Mountain View Grand Facility Mountain View Grand Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Mountain View Grand Developer Sustainable Energy Developments Energy Purchaser Mountain View Grand Location Mountain View Grand Resort & Spa NH Coordinates 44.397987°, -71.590306° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.397987,"lon":-71.590306,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

69

Investigation of techniques for improvement of seasonal streamflow forecasts in the Upper Rio Grande  

E-Print Network [OSTI]

LIST OF FIGURES Page Figure 2-1. Maps of the Upper Rio Grande basin showing the gauging sites used in this study: (a) NWS temperature and precipitation stations and snowcourse sites (left); (b) USGS streamflow gauging stations and their drainage...-7. Map of composite average monthly temperature residuals at each station from October through September for El Ni?o (solid), neutral (dotted), La Ni?a (dashed) years??????????... 29 Figure 2-8. Map of composite average monthly total precipitation...

Lee, Song-Weon

2005-11-01T23:59:59.000Z

70

International cooperation between the United States and Mexico: addressing water quality of the Lower Rio Grande  

E-Print Network [OSTI]

concerns, and later concentrates on the United States/Mexico border and transboundary issues in the Rio Grande Basin. Policy Building and Sttstainable Development Ascher and Healy (1990), focusing their analysis on third world nations, approach... provides insight into pitfalls of policy development in third world nations. The 19 pitfalls often are apparent in natural resource depletion, environmental degradation, and inefficiencies in aiding populations, usually poor, who were to benefit from...

Crouch, Kellie Gene

1997-01-01T23:59:59.000Z

71

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

43 $0.0294 W - W W - - - 43 $0.0294 W - W W - - - Northern Appalachian Basin Florida $0.0161 W W W W $0.0216 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $0.0296 $0.0277 $0.0292 $0.0309 $0.0325 $0.0328 $0.0357 $0.0451 $0.0427 4.7 -5.3 Northern Appalachian Basin Massachusetts W W - - - - - - - - -

72

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

$15.49 $13.83 W - W W - - - $15.49 $13.83 W - W W - - - Northern Appalachian Basin Florida $19.46 W W W W $29.49 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $10.33 $9.58 $10.68 $12.03 $13.69 $14.71 $16.11 $19.72 $20.69 9.1 4.9 Northern Appalachian Basin Massachusetts W W - - - - - - - - -

73

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

$0.0323 $0.0284 W - W W - - - $0.0323 $0.0284 W - W W - - - Northern Appalachian Basin Florida $0.0146 W W W W $0.0223 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $0.0269 $0.0255 $0.0275 $0.0299 $0.0325 $0.0339 $0.0380 $0.0490 $0.0468 7.2 -4.3 Northern Appalachian Basin Massachusetts W W - - - - - - - - -

74

Grand Challenges of Enterprise Integration  

SciTech Connect (OSTI)

Enterprise Integration connects and combines people, processes, systems, and technologies to ensure that the right people and the right processes have the right information and the right resources at the right time. A consensus roadmap for Technologies for Enterprise Integration was created as part of an industry/government/academia partnership in the Integrated Manufacturing Technology Initiative (IMTI). Two of the grand challenges identified by the roadmapping effort will be addressed here--Customer Responsive Enterprises and Totally Connected Enterprises. Each of these challenges is briefly discussed as to the current state of industry and the future vision as developed in the roadmap.

Brosey, W.D; Neal, R.E.; Marks, D.

2001-04-01T23:59:59.000Z

75

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

Basin Basin Destination State 2001 2002 2003 2004 2005 2006 2007 2008 2009 2001-2009 2008-2009 Northern Appalachian Basin Delaware W W $16.45 $14.29 W - W W - - - Northern Appalachian Basin Florida $21.45 W W W W $28.57 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $11.39 $10.39 $11.34 $12.43 $13.69 $14.25 $15.17 $18.16 $18.85 6.5 3.8

76

Hydrogen Storage Grand Challenge Individual Projects  

Broader source: Energy.gov [DOE]

Hydrogen Storage Grand Challenge individual projects funded for three Centers of Excellence, led by the National Renewable Energy Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory

77

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

78

Olympia-Grand Coulee No. 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission...

79

Water Basins Civil Engineering  

E-Print Network [OSTI]

Water Basins Civil Engineering Objective · Connect the study of water, water cycle, and ecosystems with engineering · Discuss how human impacts can effect our water basins, and how engineers lessen these impacts: · The basic concepts of water basins are why they are important · To use a topographic map · To delineate

Provancher, William

80

Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Texas-Louisiana- Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin W. Gulf Coast Basin Appalachian Basin Wind River Basin Eastern Shelf NW Shelf Abo Sussex-Shannon Muddy J Mesaverde- Lance-Lewis Medina/Clinton-Tuscarora Bradford-Venango-Elk Berea-Murrysville Piceance Basin Bossier Williston Basin Ft Worth Basin Davis Bighorn Basin Judith River- Eagle Permian Basin Anadarko Basin Denver Basin San Juan Basin North-Central Montana Area Uinta Basin Austin Chalk Codell-Niobrara Penn-Perm Carbonate Niobrara Chalk Dakota Morrow Mesaverde Thirty- One Cleveland Ozona Canyon Wasatch- Mesaverde Red Fork Mesaverde Granite Wash Stuart City-Edwards Bowdoin- Greenhorn Travis Peak Olmos Cotton Valley Vicksburg Wilcox Lobo Pictured Cliffs Cretaceous Cretaceous-Lower Tertiary Mancos- Dakota Gilmer Lime Major Tight Gas Plays, Lower 48 States

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Geologic and hydrologic controls on coalbed methane producibility, Williams Fork Formation, Piceance Basin, Colorado  

SciTech Connect (OSTI)

Structural and depositional setting, coal rank, gas content, permeability, hydrodynamics, and reservoir heterogeneity control the producibility of coalbed methane in the Piceance Basin. The coal-rich Upper Cretaceous, Williams Fork Formation is genetically defined and regionally correlated to the genetic sequences in the Sand Wash Basin, to the north. Net coal is thickest in north-south oriented belts which accumulated on a coastal plain, behind west-east prograding shoreline sequences. Face cleats of Late Cretaceous age strike E-NE and W-NW in the southern and northern parts of the basin, respectively, normal to the Grand Hogback thrust front. Parallelism between face-cleat strike and present-day maximum horizontal stresses may enhance or inhibit coal permeability in the north and south, respectively. Geopressure and hydropressure are both present in the basin with regional hydrocarbon overpressure dominant in the central part of the basin and hydropressure limited to the basin margins. The most productive gas wells in the basin are associated with structural terraces, anticlines, and/or correspond to Cameo-Wheeler-Fairfield coal-sandstone development, reflecting basement detached thrust-faulting, fracture-enhanced permeability, and reservoir heterogeneity. Depositional heterogeneties and thrusts faults isolate coal reservoirs along the Grand Hogback from the subsurface by restricting meteoric recharge and basinward flow of ground water. An evolving coalbed methane producibility model predicts that in the Piceance Basin extraordinary coalbed methane production is precluded by low permeability and by the absence of dynamic ground-water flow.

Tyler, R.; Scott, A.R.; Kaiser, W.R.; Nance, H.S.; McMurry, R.G. [Univ. of Texas, Austin, TX (United States)

1996-12-31T23:59:59.000Z

82

Geologic and hydrologic controls on coalbed methane producibility, Williams Fork Formation, Piceance Basin, Colorado  

SciTech Connect (OSTI)

Structural and depositional setting, coal rank, gas content, permeability, hydrodynamics, and reservoir heterogeneity control the producibility of coalbed methane in the Piceance Basin. The coal-rich Upper Cretaceous, Williams Fork Formation is genetically defined and regionally correlated to the genetic sequences in the Sand Wash Basin, to the north. Net coal is thickest in north-south oriented belts which accumulated on a coastal plain, behind west-east prograding shoreline sequences. Face cleats of Late Cretaceous age strike E-NE and W-NW in the southern and northern parts of the basin, respectively, normal to the Grand Hogback thrust front. Parallelism between face-cleat strike and present-day maximum horizontal stresses may enhance or inhibit coal permeability in the north and south, respectively. Geopressure and hydropressure are both present in the basin with regional hydrocarbon overpressure dominant in the central part of the basin and hydropressure limited to the basin margins. The most productive gas wells in the basin are associated with structural terraces, anticlines, and/or correspond to Cameo-Wheeler-Fairfield coal-sandstone development, reflecting basement detached thrust-faulting, fracture-enhanced permeability, and reservoir heterogeneity. Depositional heterogeneties and thrusts faults isolate coal reservoirs along the Grand Hogback from the subsurface by restricting meteoric recharge and basinward flow of ground water. An evolving coalbed methane producibility model predicts that in the Piceance Basin extraordinary coalbed methane production is precluded by low permeability and by the absence of dynamic ground-water flow.

Tyler, R.; Scott, A.R.; Kaiser, W.R.; Nance, H.S.; McMurry, R.G. (Univ. of Texas, Austin, TX (United States))

1996-01-01T23:59:59.000Z

83

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 16690 of 26,764 results. 81 - 16690 of 26,764 results. Page EA-1172: Sale of Surplus Natural and Low Enriched Uranium, Piketon, Ohio This EA evaluates the environmental impacts for the proposal to sell uranium for subsequent enrichment and fabrication into commercial nuclear power reactor fuel. The uranium is currently stored... http://energy.gov/nepa/ea-1172-sale-surplus-natural-and-low-enriched-uranium-piketon-ohio Page EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon This EA evaluates the environmental impacts for the U.S. Department of Energy Bonneville Power Administration's proposal to fund a program designed to prevent the extinction and begin the recovery... http://energy.gov/nepa/ea-1173-grande-ronde-basin-endemic-spring-chinook-salmon-supplemental-program-preliminary

84

Microsoft Word - GrandCoulee_FONSI.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project BPA's Finding of No Significant Impact 1 Bonneville Power Administration's Finding of No Significant Impact (FONSI) for the Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project DOE/EA-1679 SUMMARY The Bonneville Power Administration (BPA) announces its environmental findings on the Bureau of Reclamation's (Reclamation) Grand Coulee Third Powerplant 500-kV Transmission Line Replacement Project. This project involves replacing the six 500-kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile west of the TPP. BPA would design and construct

85

Divergent/passive margin basins  

SciTech Connect (OSTI)

This book discusses the detailed geology of the four divergent margin basins and establishes a set of analog scenarios which can be used for future petroleum exploration. The divergent margin basins are the Campos basin of Brazil, the Gabon basin, the Niger delta, and the basins of the northwest shelf of Australia. These four petroleum basins present a wide range of stratigraphic sequences and structural styles that represent the diverse evolution of this large and important class of world petroleum basins.

Edwards, J.D. (Shell Oil Company (US)); Santogrossi, P.A. (Shell Offshore Inc. (US))

1989-01-01T23:59:59.000Z

86

2014 Race to Zero Student Design Competition: Grand Winner Teams...  

Office of Environmental Management (EM)

2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition:...

87

EV Everywhere Grand Challenge Kick-Off | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI framingworkshopagenda062112.pdf More Documents & Publications EV Everywhere Grand...

88

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt...  

Energy Savers [EERE]

Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska SUMMARY DOE's Western Area...

89

Grand Challenge for Basic and Applied Research in Hydrogen Storage...  

Broader source: Energy.gov (indexed) [DOE]

Grand Challenge for Basic and Applied Research in Hydrogen Storage Grand Challenge for Basic and Applied Research in Hydrogen Storage Presentation from the Hydrogen Storage...

90

'Grand Challenge' for Basic and Applied Research in Hydrogen...  

Broader source: Energy.gov (indexed) [DOE]

'Grand Challenge' for Basic and Applied Research in Hydrogen Storage Solicitation 'Grand Challenge' for Basic and Applied Research in Hydrogen Storage Solicitation DOE is issuing a...

91

Grand Challenge for Basic and Applied Research in Hydrogen Storage...  

Broader source: Energy.gov (indexed) [DOE]

Grand Challenge for Basic and Applied Research in Hydrogen Storage: Statement of Objectives Grand Challenge for Basic and Applied Research in Hydrogen Storage: Statement of...

92

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Broader source: Energy.gov (indexed) [DOE]

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

93

Saft America Advanced Batteries Plant Celebrates Grand Opening...  

Broader source: Energy.gov (indexed) [DOE]

Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 -...

94

River Basin Commissions (Indiana)  

Broader source: Energy.gov [DOE]

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

95

Origin of cratonic basins  

SciTech Connect (OSTI)

Tectonic subsidence curves show that the Illinois, Michigan, and Williston basins formed by initial fault-controlled mechanical subsidence during rifting and by subsequent thermal subsidence. Thermal subsidence began around 525 Ma in the Illinois Basin, 520-460 Ma in the Michigan Basin, and 530-500 Ma in the Williston Basin. In the Illinois Basin, a second subsidence episode (middle Mississippian through Early Permian) was caused by flexural foreland subsidence in response to the Alleghanian-Hercynian orogeny. Past workers have suggested mantle phase changes at the base of the crust, mechanical subsidence in response to isostatically uncompensated excess mass following igneous intrusions, intrusion of mantle plumes into the crust, or regional thermal metamorphic events as causes of basin initiation. Cratonic basins of North America, Europe, Africa, and South America share common ages of formation, histories of sediment accumulation, temporal volume changes of sediment fills, and common dates of interregional unconformities. Their common date of formation suggests initiation of cratonic basins in response to breakup of a late Precambrian supercontinent. This supercontinent acted as a heat lens that caused partial melting of the lower crust and upper mantle followed by emplacement of anorogenic granites during extensional tectonics in response to supercontinent breakup. Intrusion of anorogenic granites and other partially melted intrusive rocks weakened continental lithosphere, thus providing a zone of localized regional stretching and permitting formation of cratonic basins almost simultaneously over sites of intrusion of these anorogenic granites and other partially melted intrusive rocks.

de V. Klein, G.; Hsui, A.T.

1987-12-01T23:59:59.000Z

96

Grand Meadow Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Grand Meadow Wind Farm Grand Meadow Wind Farm Jump to: navigation, search Name Grand Meadow Wind Farm Facility Grand Meadow Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Developer EnXco Energy Purchaser Xcel Energy Location Dexter MN Coordinates 43.707798°, -92.654071° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.707798,"lon":-92.654071,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

97

Aspects of grand unified and string phenomenology  

E-Print Network [OSTI]

Explored in this report is the essential interconnectedness of Grand Unified and String Theoretic Phenomenology. In order to extract a modeled connection to low-energy physics from the context of superstring theory, it is presently necessary...

Walker, Joel Wesley

2005-11-01T23:59:59.000Z

98

Select Economic Implications for the Biological Control of Arundo donax along the Rio Grande  

E-Print Network [OSTI]

, from which new shoots sprout (Decruyenaere and Holt 2001). Younger plants are affected by drought, while the older plants tend to survive (Hoshovsky 1986; Perdue 1958). 7 1 Phragmites australis is a reed similar to Arundo, but is native to the Rio... Grande Basin. These two species are difficult to distinguish from one another; however, small differences can be noted in the density and size of the plant (Arundo grows in much taller, denser stands that Phragmites) and the shape of the seedhead (Arundo...

Seawright, Emily Kaye

2010-10-12T23:59:59.000Z

99

K-Basins.pub  

Broader source: Energy.gov (indexed) [DOE]

2 2 AUDIT REPORT U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES COMPLETION OF K BASINS MILESTONES APRIL 2002 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman (Signed) Inspector General SUBJECT: INFORMATION: Audit Report on "Completion of K Basins Milestones" BACKGROUND The Department of Energy (Department) has been storing 2,100 metric tons of spent nuclear fuel at the Hanford Site in southeastern Washington. The fuel, used in support of Hanford's former mission, is currently stored in canisters that are kept in two enclosed water-filled pools known as the K Basins. The K Basins represent a significant risk to the environment due to their deteriorating condition. In fact, the K East Basin, which is near the Columbia River, has

100

Chattanooga Eagle Ford Western Gulf TX-LA-MS Salt Basin Uinta Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Western Western Gulf TX-LA-MS Salt Basin Uinta Basin Devonian (Ohio) Marcellus Utica Bakken*** Avalon- Bone Spring San Joaquin Basin Monterey Santa Maria, Ventura, Los Angeles Basins Monterey- Temblor Pearsall Tuscaloosa Big Horn Basin Denver Basin Powder River Basin Park Basin Niobrara* Mowry Niobrara* Heath** Manning Canyon Appalachian Basin Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville- Bossier Hermosa Mancos Pierre Conasauga Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Montana Thrust Belt Marfa Basin Valley & Ridge Province Arkoma Basin Forest

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Rio Grande North | Open Energy Information  

Open Energy Info (EERE)

Rio Grande North Rio Grande North Facility Rio Grande North Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Offshore from South Padre Island TX Coordinates 26.364°, -97.078° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.364,"lon":-97.078,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

102

Rio Grande South | Open Energy Information  

Open Energy Info (EERE)

Rio Grande South Rio Grande South Facility Rio Grande South Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Gulf of Mexico TX Coordinates 26.189°, -97.053° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.189,"lon":-97.053,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

103

Rio Grande sediment study -- Supply and transport  

SciTech Connect (OSTI)

The 1992 New Mexico State Legislature directed the Interstate Stream Commission (ISC) to study the feasibility of clearing and deepening the channel of the Rio Grande between Albuquerque and Elephant Butte to improve water conveyance and water conservation. The ISC requested the US Army Corps of Engineers-Albuquerque District (COE) to undertake this study under the Planning Assistance to States Program. The study was divided into two phases. Phase 1 consisted of an analysis of the sediment contribution to the Rio grande from the tributaries and an evaluation of the existing US Geological Survey (USGS) sediment gage data. Phase 2 will be an analysis, through the use of an HEC-6, Scour and Deposition in Rivers and Reservoirs, computer model, to determine the long-term performance of any Rio Grande channel improvements. This narrative presents the Phase 1 methods and results.

Diniz, E. [Resource Technology, Inc., Albuquerque, NM (United States); Eidson, D.; Bourgeois, M. [Army Corps of Engineers, Albuquerque, NM (United States)

1995-12-31T23:59:59.000Z

104

SunShot Grand Challenge | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SunShot Grand Challenge SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28 SunShot Grand Challenge Participants gather for the plenary session at the SunShot Grand Challenge Summit and Technology Forum in Denver, Colorado. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:10 Arun Majumdar, Founding Director, ARPA-E 2 of 28 Arun Majumdar, Founding Director, ARPA-E Arun Majumdar, Founding Director, ARPA-E gives the welcoming remarks. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:16 Energy Secretary Steven Chu at SunShot Grand Challenge 3 of 28 Energy Secretary Steven Chu at SunShot Grand Challenge Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:32

105

Soybean Production in the Rio Grande Valley  

E-Print Network [OSTI]

chlorosis or being high in chlorides, then it would be wise to #27;nd a variety that is less sensitive to iron chlorosis or to high chloride levels. In the Rio Grande Valley, soybean yields have been acceptable as long as supplemental water (irrigation... Grande Valley compensate for variation in plant populations. At low populations, soybean plants usually are bushy and set pods on long lateral branches near the ground. As populations increase, pods are set closer to the plant?s main stem and higher...

Fromme, D. D.; Isakeit, T.; Falconer, L.

106

Rio Grande rift: problems and perspectives  

SciTech Connect (OSTI)

Topics and ideas addressed include: (1) the regional extent of the Rio Grande rift; (2) the structure of the crust and upper mantle; (3) whether the evidence for an axile dike in the lower crust is compelling; (4) the nature of faulting and extension in the crust; and (5) the structural and magmatic development of the rift. 88 references, 5 figures.

Baldridge, W.S.; Olsen, K.H.; Callender, J.F.

1984-01-01T23:59:59.000Z

107

Grand unified strings and galaxy formation  

Science Journals Connector (OSTI)

The possibility that topologically stable strings formed at a grand unification phase transition led to galaxy formation is discussed. A large class of solutions describing non-self-intersecting loops is presented. The gravitational field and power radiated from a simple class of oscillating configurations of string is calculated, and the possibility of its detection discussed. Unique features of the string scenario are emphasized.

Neil Turok

1984-01-01T23:59:59.000Z

108

EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Plug-in Electric Vehicles & Batteries EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in Electric Vehicles EV Everywhere Grand Challenge: DOE's 10-Year Vision for...

109

Video: Mira Loma High School Named Science Bowl Grand Champion...  

Energy Savers [EERE]

Mira Loma High School Named Science Bowl Grand Champion Video: Mira Loma High School Named Science Bowl Grand Champion April 28, 2014 - 6:03pm Addthis Secretary Moniz speaks at the...

110

SunShot Grand Challenge Summit Breakout Sessions Announced  

Broader source: Energy.gov [DOE]

The 2014 SunShot Grand Challenge Summit is only six weeks away! SunShot is excited to announce our thought-provoking lineup of Grand Challenge Breakout Sessions.

111

Office of Indian Energy Newsletter: Fall/Winter 2014 | Department...  

Energy Savers [EERE]

with START Support Message from the Director: Pilar Thomas Sharing Knowledge: Native Student Interns Make A Difference in Indian Country Winning the Future: Grand Ronde Solar...

112

2014 Race to Zero Student Design Competition: Grand Winner Teams  

Broader source: Energy.gov [DOE]

2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of Energy.

113

Grand Ridge Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Grand Ridge Wind Farm Facility Grand Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Location La Salle County IL Coordinates 40.999966°, -88.401693° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.999966,"lon":-88.401693,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

114

EV Everywhere Grand Challenge Kick-Off  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EV Everywhere Grand Challenge Kick-Off Thursday, June 21, 2012 - Hyatt Regency, Dearborn, MI Event Objective: To showcase existing DOE efforts in vehicle electrification and to obtain stakeholder input on the overall concept of the EV Everywhere Grand Challenge, the high-level strategy, and aggressive next-generation technology development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program 8:35-8:45 AM STRATEGIC SIGNIFICANCE OF PLUG-IN ELECTRIC VEHICLES

115

Grand Gulf-prioritization of regulatory requirements  

SciTech Connect (OSTI)

As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit.

Meisner, M.J. (Entergy Operations Inc., Port Gibson, MS (United States))

1993-01-01T23:59:59.000Z

116

ark your calen-dars! The grand  

E-Print Network [OSTI]

years of distinguished scientific leadership by Dr. Charles R. Goldman at Lake Tahoe and the efforts OF THE LAKE TAHOE BASIN. Tahoe Laboratory Post Office Box 633 2400 Lake Forest Road Tahoe City, CA 96145 Phone TO RESEARCH, EDUCATION AND PUBLIC OUTREACH ON LAKES AND THEIR SURROUNDING WATERSHEDS AND AIRSHEDS. LAKE

Schladow, S. Geoffrey

117

Agropecuaria e Industrial Serra Grande | Open Energy Information  

Open Energy Info (EERE)

Agropecuaria e Industrial Serra Grande Agropecuaria e Industrial Serra Grande Jump to: navigation, search Name Agropecuaria e Industrial Serra Grande Place São Raimundo das Mangabeiras, Maranhao, Brazil Product Privately owned Brazil based ethanol producer, located in the state of Maranhao. References Agropecuaria e Industrial Serra Grande[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Agropecuaria e Industrial Serra Grande is a company located in São Raimundo das Mangabeiras, Maranhao, Brazil . References ↑ "[ Agropecuaria e Industrial Serra Grande]" Retrieved from "http://en.openei.org/w/index.php?title=Agropecuaria_e_Industrial_Serra_Grande&oldid=341914" Categories:

118

Data Basin | Open Energy Information  

Open Energy Info (EERE)

Data Basin Data Basin Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Data Basin Agency/Company /Organization: Conservation Biology Institute Topics: GHG inventory Resource Type: Dataset, Maps Website: databasin.org/ Data Basin Screenshot References: Data Basin [1] Overview "Data Basin is an innovative, online system that connects users with spatial datasets, tools, and expertise. Individuals and organization can explore and download a vast library of datasets, upload their own data, create and publish projects, form working groups, and produce customized maps that can be easily shared. The building blocks of Data Basin are: Datasets: A dataset is a spatially explicit file, currently Arcshape and ArcGrid files. These can be biological, physical, socioeconomic, (and

119

2011-2012 Efficient Irrigation for Water Conservation in the Rio Grande Basin Progress and Accomplishments  

E-Print Network [OSTI]

related to water conserving technologies or mitigation strategies when land use changes from pasture to bioenergy cellulosic feedstock; 4) business finances involving costs and delivery rates of irrigation districts; and 5) water implications... of producing biofuels. The project has quantified important economic and investment aspects of water conservation, bioenergy production of feedstock desalination, biological control of Arundo policy insight, and rapport with the water leaders in the region...

Kalisek, D.

120

Rare, Threatened and Endangered Species of the Rio Grande/ Rio Bravo Basin: A Bibliography  

E-Print Network [OSTI]

America. The river and its tributaries are major drainages for the plateau shrub lands of central New Mexico, the Chihuahuan Desert and the Tamaulipan Mezquital. The Chihuahuan Desert of New Mexico, Texas and Mexico ranks as the world’s most... biologically diverse desert ecoregion, supporting a species richness of more than 100 mammals, 250 birds, 100 reptiles and 20 amphibians (Ricketts et al. 1999). Likewise, the Tamaulipan Mezquital of South Texas and adjacent Mexico is considered one...

Wilkins, Neal; Gil, Karine

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Efficient Irrigation for Water Conservation in the Rio Grande Basin: 2010/2011 Progress and Accomplishments  

E-Print Network [OSTI]

?22 tons per acre to 28?30 tons per acre. 12 13 Water and aquatic vegetation management Leinauer, B. (2010, November). Irrigation management. Presentation at the DEULA Rheinland Head Greenkeeper Continuing Education Seminar, Kempen, Germany. Leinauer..., B. (2010, November). Measuring turf stress: Tools for the turf manager. Presentation at the COMPO Sports Turf Seminar ?Everything About Sports Turf,? Bay Arena, Leverkusen, Germany. Leinauer, B. (2010, November). Measuring turf stress: Tools...

Kalisek, D.; Harris, B. L.; Runyan, C.; DeMouche, L.

122

Efficient Irrigation for Water conservation in the Rio Grande Basin: 2010-2011 Progress and Accomplishments  

E-Print Network [OSTI]

?22 tons per acre to 28?30 tons per acre. 12 13 Water and aquatic vegetation management Leinauer, B. (2010, November). Irrigation management. Presentation at the DEULA Rheinland Head Greenkeeper Continuing Education Seminar, Kempen, Germany. Leinauer..., B. (2010, November). Measuring turf stress: Tools for the turf manager. Presentation at the COMPO Sports Turf Seminar ?Everything About Sports Turf,? Bay Arena, Leverkusen, Germany. Leinauer, B. (2010, November). Measuring turf stress: Tools...

Kalisek, D.; Harris, B.L.; Runyan, C.; DeMouche, L.

2011-06-21T23:59:59.000Z

123

EA-64 Basin Electric Power Cooperative | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Basin Electric Power Cooperative EA-64 Basin Electric Power Cooperative Order authorizing Basin Electric Power Cooperative to export electric energy to Canada EA-64 Basin Electric...

124

Grand valley irrigation return flow case study  

SciTech Connect (OSTI)

Irrigation water supply is furnished annually to about 71,500 acres of land in the Grand Valley of western Colorado. Return flows from that irrigation contribute about 780,000 tpy of salt to the Colorado River, causing an increase of 77 mg/l in the salinity concentration at Imperial Dam. A case study of water quality in this region is focused on: water quality data for irrigation and return flows/ identification of regulations that affect irrigation and return flows/ and a proposed program for controlling salinity levels. (1 map, 9 references, 8 tables)

Keys, J.W.

1981-06-01T23:59:59.000Z

125

ADVANCED CHEMISTRY BASINS MODEL  

SciTech Connect (OSTI)

The advanced Chemistry Basin Model project has been operative for 48 months. During this period, about half the project tasks are on projected schedule. On average the project is somewhat behind schedule (90%). Unanticipated issues are causing model integration to take longer then scheduled, delaying final debugging and manual development. It is anticipated that a short extension will be required to fulfill all contract obligations.

William Goddard III; Lawrence Cathles III; Mario Blanco; Paul Manhardt; Peter Meulbroek; Yongchun Tang

2004-05-01T23:59:59.000Z

126

Petroleum basin studies  

SciTech Connect (OSTI)

This book reviews the tectonic setting, basin development and history of exploration of a number of selected petroleum provinces located in a variety of settings in the Middle East, North Sea, Nigeria, the Rocky Mountains, Gabon and China. This book illustrates how ideas and models developed in one area may be applied to other regions. Regional reviews and the reassessment of petroleum provinces are presented.

Shannon, P.M. (Univ. College, Dublin (IE)); Naylor, D. (Westland Exploration Ltd., Dublin (IE))

1989-01-01T23:59:59.000Z

127

Caribbean basin framework, 3: Southern Central America and Colombian basin  

SciTech Connect (OSTI)

The authors recognize three basin-forming periods in southern Central America (Panama, Costa Rica, southern Nicaragua) that they attempt to correlate with events in the Colombian basin (Bowland, 1984): (1) Early-Late Cretaceous island arc formation and growth of the Central American island arc and Late Cretaceous formation of the Colombian basin oceanic plateau. During latest Cretaceous time, pelagic carbonate sediments blanketed the Central American island arc in Panama and Costa Rica and elevated blocks on the Colombian basin oceanic plateau; (2) middle Eocene-middle Miocene island arc uplift and erosion. During this interval, influx of distal terrigenous turbidites in most areas of Panama, Costa Rica, and the Colombian basin marks the uplift and erosion of the Central American island arc. In the Colombian basin, turbidites fill in basement relief and accumulate to thicknesses up to 2 km in the deepest part of the basin. In Costa Rica, sedimentation was concentrated in fore-arc (Terraba) and back-arc (El Limon) basins; (3) late Miocene-Recent accelerated uplift and erosion of segments of the Central American arc. Influx of proximal terrigenous turbidites and alluvial fans in most areas of Panama, Costa Rica, and the Colombian basin marks collision of the Panama arc with the South American continent (late Miocene early Pliocene) and collision of the Cocos Ridge with the Costa Rican arc (late Pleistocene). The Cocos Ridge collision inverted the Terraba and El Limon basins. The Panama arc collision produced northeast-striking left-lateral strike-slip faults and fault-related basins throughout Panama as Panama moved northwest over the Colombian basin.

Kolarsky, R.A.; Mann, P. (Univ. of Texas, Austin (United States))

1991-03-01T23:59:59.000Z

128

Advanced Chemistry Basins Model  

SciTech Connect (OSTI)

The DOE-funded Advanced Chemistry Basin model project is intended to develop a public domain, user-friendly basin modeling software under PC or low end workstation environment that predicts hydrocarbon generation, expulsion, migration and chemistry. The main features of the software are that it will: (1) afford users the most flexible way to choose or enter kinetic parameters for different maturity indicators; (2) afford users the most flexible way to choose or enter compositional kinetic parameters to predict hydrocarbon composition (e.g., gas/oil ratio (GOR), wax content, API gravity, etc.) at different kerogen maturities; (3) calculate the chemistry, fluxes and physical properties of all hydrocarbon phases (gas, liquid and solid) along the primary and secondary migration pathways of the basin and predict the location and intensity of phase fractionation, mixing, gas washing, etc.; and (4) predict the location and intensity of de-asphaltene processes. The project has be operative for 36 months, and is on schedule for a successful completion at the end of FY 2003.

William Goddard; Mario Blanco; Lawrence Cathles; Paul Manhardt; Peter Meulbroek; Yongchun Tang

2002-11-10T23:59:59.000Z

129

EV Everywhre Grand Challenge - Battery Status and Cost Reduction...  

Broader source: Energy.gov (indexed) [DOE]

EV Everywhere Grand Challenge Battery Status and Cost Reduction Prospects July 26, 2012 David Howell Team Lead, Hybrid & Electric Systems Vehicle Technologies Program U.S....

130

Highlights from the 2014 SunShot Grand Challenge Summit  

Broader source: Energy.gov [DOE]

Sharing key moments from the SunShot Grand Challenge Summit -- an event that brings together hundreds of leaders across the solar community.

131

EV Everywhere Grand Challenge - Electric Motors and Critical...  

Broader source: Energy.gov (indexed) [DOE]

Electric Motors and Critical Materials Breakout Laura Marlino Oak Ridge National Laboratory Iver Anderson Ames Laboratory Facilitators July 24, 2012 EV Everywhere Grand Challenge...

132

EV Everywhere Grand Challenge- Battery Workshop attendees list  

Broader source: Energy.gov [DOE]

Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

133

Arroyo Grande, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Arroyo Grande, CA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.1185868, -120.5907252 Loading map... "minzoom":false,"mappingservice":"go...

134

City of Grand Rapids- Green Building Requirements for Municipal Buildings  

Broader source: Energy.gov [DOE]

In January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement the principles...

135

EV Everywhere Grand Challenge Introduction for Electric Drive...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Introduction for Electric Drive Workshop Presentation given by EERE Assistant Secretary David Danielson at...

136

EV Everywhere Grand Challenge- Battery Status and Cost Reduction Prospects  

Broader source: Energy.gov [DOE]

Presentation given by technology manager David Howell at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

137

DOE/EIS-0485 Draft Environmental Impact Statement Grande Prairie...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1000 Independence Avenue SW Washington, DC 20585 Telephone: (800) 472-2756 DOE NEPA Web Site: http:energy.gov nepaoffice-nepa-policy-and-compliance ABSTRACT: Grande...

138

Grand Opening for Project LIBERTY: Nation's First Plant to Use...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

its grand opening September 3, 2014, becoming the first commercial-scale cellulosic ethanol plant to use corn waste as a feedstock. Developed through a joint venture between...

139

Susquehanna River Basin Compact (Maryland)  

Broader source: Energy.gov [DOE]

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

140

Coalbed methane resource potential of the Piceance Basin, northwestern Colorado  

SciTech Connect (OSTI)

As predicted, from an evolving coalbed methane producibility model, prolific coalbed methane production is precluded in the Piceance Basin by the absence of coal bed reservoir continuity and dynamic ground-water flow. The best potential for production may lie at the transition zone from hydropressure to hydrocarbon overpressure and/or in conventional traps basinward of where outcrop and subsurface coals are in good reservoir and hydraulic communication. Geologic and hydrologic synergy among tectonic and structural setting, depositional systems and coal distribution, coal rank, gas content, permeability and hydrodynamics are the controls that determine the coalbed methane resource potential of the Piceance Basin. Within the coal-bearing Upper Cretaceous Williams Fork Formation, the prime coalbed methane target, reservoir heterogeneity and thrust faults cause coal beds along the Grand Hogback and in the subsurface to be in modest to poor reservoir and hydraulic communication, restricting meteoric ground water recharge and basinward flow. Total subsurface coalbed methane resources are still estimated to be approximately 99 Tcf (3.09 Tm{sup 3}), although coalbed methane resource estimates range between 80 (2.49 Tm{sup 3}) and 136 Tcf (4.24 Tm{sup 3}), depending on the calculation method used. To explore for high gas contents or fully gas-saturated coals and consequent high productivity in the Piceance Basin, improved geologic and completion technologies including exploration and development for migrated conventionally and hydrodynamically trapped gases, in-situ generated secondary biogenic gases, and solution gases will be required.

Tyler, R.; Scott, A.R.; Kaiser, W.R. [Univ. of Texas, Austin, TX (United States)

1996-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Vehicle Technologies Office: EV Everywhere Grand Challenge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Challenge Challenge With their immense potential for increasing the country's energy, economic, and environmental security, plug-in hybrid electric and all-electric vehicles (also known as plug-in electric vehicles, or PEVs) will play a key role in the country's transportation future. In fact, transitioning to electric drive vehicles (including hybrid-electric) could reduce U.S. oil dependence by more than 80% and greenhouse gas emissions by more than 60%. The EV Everywhere Grand Challenge focuses on the U.S. becoming the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years. To learn more about electric vehicles, see our Plug-in Electric Vehicle Basics page. To help meet the EV Everywhere goals, the Vehicle Technologies Office supports efforts in a variety of areas:

142

Grand Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Electric Coop, Inc Electric Coop, Inc Jump to: navigation, search Name Grand Electric Coop, Inc Place South Dakota Utility Id 7484 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Heat Rate Commercial Farm and Residential Electric Heat Rate Residential Metered Security Light - 100 HPS Lighting Metered Security Light - 175 MV Lighting Metered Security Light - 250 HPS Lighting Metered Security Light - 400 MV Lighting Schedule A - Farm and Residential Residential Schedule ADF -Du al Fuel Service Residential

143

Grand River Dam Authority | Open Energy Information  

Open Energy Info (EERE)

Dam Authority Dam Authority Jump to: navigation, search Name Grand River Dam Authority Place Oklahoma Utility Id 7490 Utility Location Yes Ownership S NERC Location SPP NERC SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png general service Commercial general service commercial Commercial large general servic time of use distributional Commercial

144

Seismic amplitude anomalies at Mestena Grande field  

SciTech Connect (OSTI)

Mestena Grande field is located in northeast Jim Hogg County, Texas. Gas and condensate are produced from the middle lobe of the middle Eocene Queen City Formation. The Queen City is approximately 100 ft thick and the middle lobe, the main reservoir, is only 30 ft thick, which is well below tuning thickness. Porosities in the producing sands are generally 15-25% and permeabilities are usually 15-25 md, the maximum being about 80 md. The most recent seismic data exhibit amplitude anomalies that have some correspondence with the production. The strongest amplitudes are from the vicinity of the better wells and increase with offset. Most of the dry holes are on weak amplitudes that decrease with offset. Modeling the AVO response of a productive well, however, has predicted an amplitude decrease with offset. This disagreement is attributed to the lack of accurate shear wave velocities and the very thinly laminated sands.

Burnett, R. (Union Texas Petroleum, Houston, TX (USA))

1989-09-01T23:59:59.000Z

145

Grand Challenge: Scalable Stateful Stream Processing for Smart Grids  

E-Print Network [OSTI]

to the ACM DEBS Grand Challenge 2014, which evaluates event-based systems for smart grid analytics. OurGrand Challenge: Scalable Stateful Stream Processing for Smart Grids Raul Castro Fernandez for event queries. The 2014 edition of the challenge [15] focuses on smart grid analytics and is based

Pietzuch, Peter

146

The Particle Adventure | Unsolved Mysteries | Forces and the Grand Unified  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unsolved Mysteries - Forces and the Grand Unified Theory Unsolved Mysteries - Forces and the Grand Unified Theory Forces and the Grand Unified Theory Physicists hope that a Grand Unified Theory will unify the strong, weak, and electromagnetic interactions. There have been several proposed Unified Theories, but we need data to pick which, if any, of these theories describes nature. If a Grand Unification of all the interactions is possible, then all the interactions we observe are all different aspects of the same, unified interaction. However, how can this be the case if strong and weak and electromagnetic interactions are so different in strength and effect? Strangely enough, current data and theory suggests that these varied forces merge into one force when the particles being affected are at a high enough energy.

147

Grand Challenges | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Grand Challenges Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Basic Research Needs Grand Challenges Science Highlights News & Events Publications Contact BES Home Research Grand Challenges Print Text Size: A A A RSS Feeds FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored workshops that began in 2001. Over and over, the recommendations from these workshops described similar themes that in this new era of science, we would design, discover, and synthesize new materials and molecular assemblies through atomic scale control; probe and control photon, phonon, electron, and ion interactions

148

Advanced Chemistry Basins Model  

SciTech Connect (OSTI)

The objective of this project is to: (1) Develop a database of additional and better maturity indicators for paleo-heat flow calibration; (2) Develop maturation models capable of predicting the chemical composition of hydrocarbons produced by a specific kerogen as a function of maturity, heating rate, etc.; assemble a compositional kinetic database of representative kerogens; (3) Develop a 4 phase equation of state-flash model that can define the physical properties (viscosity, density, etc.) of the products of kerogen maturation, and phase transitions that occur along secondary migration pathways; (4) Build a conventional basin model and incorporate new maturity indicators and data bases in a user-friendly way; (5) Develop an algorithm which combines the volume change and viscosities of the compositional maturation model to predict the chemistry of the hydrocarbons that will be expelled from the kerogen to the secondary migration pathways; (6) Develop an algorithm that predicts the flow of hydrocarbons along secondary migration pathways, accounts for mixing of miscible hydrocarbon components along the pathway, and calculates the phase fractionation that will occur as the hydrocarbons move upward down the geothermal and fluid pressure gradients in the basin; and (7) Integrate the above components into a functional model implemented on a PC or low cost workstation.

Blanco, Mario; Cathles, Lawrence; Manhardt, Paul; Meulbroek, Peter; Tang, Yongchun

2003-02-13T23:59:59.000Z

149

KE Basin Sludge Flocculant Testing  

SciTech Connect (OSTI)

In the revised path forward and schedule for the K Basins Sludge Retrieval and Disposal Project, the sludge in K East (KE) Basin will be moved from the floor and pits and transferred to large, free-standing containers located in the pits (so as to isolate the sludge from the basin). When the sludge is pumped into the containers, it must settle fast enough and clarify sufficiently that the overflow water returned to the basin pool will not cloud the water or significantly increase the radiological dose rate to the operations staff as a result of increased suspended radioactive material. The approach being evaluated to enhance sludge settling and speed the rate of clarification is to add a flocculant to the sludge while it is being transferred to the containers. In February 2004, seven commercial flocculants were tested with a specific K Basin sludge simulant to identify those agents that demonstrated good performance over a broad range of slurry solids concentrations. From this testing, a cationic polymer flocculant, Nalco Optimer 7194 Plus (7194+), was shown to exhibit superior performance. Related prior testing with K Basin sludge and simulant in 1994/1996 had also identified this agent as promising. In March 2004, four series of jar tests were conducted with 7194+ and actual KE Basin sludge (prepared by combining selected archived KE sludge samples). The results from these jar tests show that 7194+ greatly improves settling of the sludge slurries and clarification of the supernatant.

Schmidt, Andrew J.; Hallen, Richard T.; Muzatko, Danielle S.; Gano, Sue

2004-06-23T23:59:59.000Z

150

Williston basin Seislog study  

SciTech Connect (OSTI)

This paper describes the results of Seislog (trade name) processing and interpretation of an east-west line in the North Dakota region of the Williston basin. Seislog processing involves inversion of the seismic trace data to produce a set of synthetic sonic logs. These resulting traces, which incorporate low-frequency velocity information, are displayed in terms of depth and isotransit times. These values are contoured and colored, based on a standard stratigraphic color scheme. The section studied is located just north of a dual producing oil pool from zones in the Ordovician Red River and Devonian Duperow Formations. A sonic log from the Long Creek 1 discovery well was digitized and filtered to match the frequency content of the original seismic data. This allows direct comparison between units in the well and the pseudosonic log (Seislog) trace nearest the well. Porosity development and lithologic units within the lower Paleozoic stratigraphic section can be correlated readily between the well and Seislog traces. Anomalous velocity zones within the Duperow and Red River Formations can be observed and correlated to producing intervals in the nearby wells. These results emphasize the importance of displaying inversion products that incorporate low-frequency data in the search for hydrocarbons in the Williston basin. The accumulations in this region are local in extent and are difficult to pinpoint by using conventional seismic data or displays. Seislog processing and displays provide a tested method for identification and delineation of interval velocity anomalies in the Red River and Duperow stratigraphic sections. These techniques can significantly reduce risks in both exploration and delineation drilling of these types of targets.

Mummery, R.C.

1985-02-01T23:59:59.000Z

151

Methane generation at Grand Gulf Nuclear Station  

SciTech Connect (OSTI)

The methane generation at Grand Gulf has been brought to light twice. The initial event occurred in February 1990 and the second in December 1993. Both events involved the receipt of a cask at Barnwell Waste Management Facility that when opened indicated a gas escaping. The gas was subsequently sampled and indicated a percentage of explosive gas. Both events involved powdered resin and indicated that the generation was from a bacterial attack of the organic materials (cellulose in the powdered resin mixture). The first event occurred and was believed to be isolated in a particular waste stream. The situation was handled and a biocide was found to be effective in treatment of liners until severe cross contamination of another waste stream occurred. This allowed the shipment of a liner that was required to be sampled for explosive gases. The biocide used by GGNS was allowed reintroduction into the floor drains and this allowed the buildup of immunity of the bacterial population to this particular biocide. The approval of a new biocide has currently allowed GGNS to treat liners and ship them offsite.

Carver, M.L. [Entergy Operations, Inc., Grand Gulf Nuclear Station, Port Gibson, MS (United States)

1995-09-01T23:59:59.000Z

152

Static Temperature Survey At Rio Grande Rift Region (Morgan,...  

Open Energy Info (EERE)

Sares (2010) Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Additional References Retrieved from "http:en.openei.orgwindex.php?titleStaticTem...

153

Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan...  

Open Energy Info (EERE)

Sares (2010) Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Additional References Retrieved from "http:en.openei.orgwindex.php?titleDataAcqui...

154

Data Compendium for the Logging Test Pits at the ERDA Grand Junction...  

Broader source: Energy.gov (indexed) [DOE]

Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound (December 1975) Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound...

155

Bull Trout Life History, Genetics, Habitat Needs, and Limiting Factors in Central and Northeast Oregon. Annual Report 1996.  

SciTech Connect (OSTI)

This study is part of a multi-year research project studying aspects of bull trout life history, ecology and genetics. This report covers the activities of the project in 1996. Results and analysis are presented in the following five areas: (1) analysis of the genetic structure of Oregon bull trout populations; (2) distribution and habitat use of bull trout and brook trout in streams containing both species; (3) bull trout spawning surveys; (4) summary and analysis of historical juvenile bull trout downstream migrant trap catches in the Grande Ronde basin; and (5) food habits and feeding behavior of bull trout alone and in sympatry with brook trout.

Bellerud, Blane L.; Gunckel, Stephanie; Hemmingsen, Alan R.; Buchanan, David V.; Howell, Philip J.

1997-10-01T23:59:59.000Z

156

Rivanna River Basin Commission (Virginia)  

Broader source: Energy.gov [DOE]

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

157

Coal Supply Basin Destination State  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Implicit Price Deflators for Gross Domestic Product, as published by the U.S. Bureau of Economic Analysis. For the composition of coal basins, refer to the definition of...

158

EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects  

Broader source: Energy.gov (indexed) [DOE]

30: Facility Operations at the U.S. DOE Grand Junction 30: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD June 8, 1996 EA-0930: Finding of No Significant Impact Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand

159

DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge  

Broader source: Energy.gov (indexed) [DOE]

Awardees for the Industrial Energy Efficiency Grand Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational industrial processes and technologies that can significantly reduce greenhouse gas emissions throughout the industrial sector. The funding will be matched by more than $5 million in private industry funding to support a total of $18 million in projects that will enhance America's energy security and strengthen our economy.

160

SunShot Grand Challenge Summit 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SunShot Grand Challenge Summit 2014 SunShot Grand Challenge Summit 2014 SunShot Grand Challenge Summit 2014 May 19, 2014 8:00AM PDT to May 22, 2014 5:00PM PDT Anaheim, California Hilton Anaheim The DOE SunShot Initiative Grand Challenge Summit 2014 will bring together more than 800 members of the solar community including SunShot-funded project teams, industry leaders, innovative researchers and scientists, and local, state and federal government policymakers to review the progress made and discuss the challenges ahead to make solar energy more affordable and widespread across America. The event will include activities that celebrate the accomplishments across more than 250 SunShot-funded projects and discuss the path forward for the U.S. solar energy industry. Plenary Sessions and Keynote Speakers - Top leaders from business,

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Saft America Advanced Batteries Plant Celebrates Grand Opening in  

Broader source: Energy.gov (indexed) [DOE]

Saft America Advanced Batteries Plant Celebrates Grand Opening in Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 - 12:30pm Addthis Department of Energy Investment Helps Support Job Creation, U.S. Economic Competitiveness and Advanced Vehicle Industry WASHINGTON, D.C. - Today, Secretary Steven Chu joined with Saft America to announce the grand opening of the company's Jacksonville, Florida, factory, which will produce advanced lithium-ion batteries to power electric vehicles and other applications. Saft America estimates it will create nearly 280 permanent jobs at the factory, and the city of Jacksonville expects an additional 800 indirect jobs to be created within its community. The project has created or preserved an estimated 300

162

Alpine Extensional Detachment Tectonics In The Grande Kabylie Metamorphic  

Open Energy Info (EERE)

Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Alpine Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Details Activities (0) Areas (0) Regions (0) Abstract: The Maghrebides are part of the peri-Mediterranean Alpine orogen. They expose in their inner zone inliers of high-grade crystalline rocks surrounded by Oligo-Miocene and younger Miocene cover. Detailed mapping coupled with structural and petrological investigations in the Grande Kabylie massif, and the reinterpretation of the available geochronological data, allow us to refute the traditional concept of rigid behaviour of this

163

DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge  

Broader source: Energy.gov (indexed) [DOE]

Awardees for the Industrial Energy Efficiency Grand Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational industrial processes and technologies that can significantly reduce greenhouse gas emissions throughout the industrial sector. The funding will be matched by more than $5 million in private industry funding to support a total of $18 million in projects that will enhance America's energy security and strengthen our economy.

164

Grand Blanc Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Grand Blanc Generating Station Biomass Facility Grand Blanc Generating Station Biomass Facility Jump to: navigation, search Name Grand Blanc Generating Station Biomass Facility Facility Grand Blanc Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

165

EA-1037: Uranium Lease Management Program, Grand Junction, Colorado |  

Broader source: Energy.gov (indexed) [DOE]

37: Uranium Lease Management Program, Grand Junction, Colorado 37: Uranium Lease Management Program, Grand Junction, Colorado EA-1037: Uranium Lease Management Program, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of domestic uranium and vanadium ores, to maintain a viable domestic mining and milling infrastructure required to produce and mill these ores, and to provide assurance of a fair monetary return to the U.S. Government. The Uranium Lease Management Program gives The Department of Energy the flexibility to continue leasing these lands. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 22, 1995

166

SunShot Grand Challenge Highlights Ambitious Efforts along the...  

Office of Environmental Management (EM)

Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the...

167

Grand Opening of Abengoa's Biorefinery: Nation's Third Commercial...  

Office of Environmental Management (EM)

its grand opening on October 17, 2014, in Hugoton, Kansas. The Abengoa Bioenergy Biomass of Kansas (ABBK) facility is the first of its kind to use a proprietary enzymatic...

168

EV Everywhere Grand Challenge- Charging Infrastructure Enabling Flexible EV Design  

Broader source: Energy.gov [DOE]

Presentation given by Vehicle Technologies Office technology manager Lee Slezak at the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

169

EV Everywhere Grand Challenge Introduction for Electric Drive Workshop  

Broader source: Energy.gov [DOE]

Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL.

170

DEPARTMENT OF UROLOGIC SCIENCES GRAND ROUNDS FOR 2014-2015  

E-Print Network [OSTI]

Tempany-Afdhal, Professor of Radiology, Harvard Medical School #12;DEPARTMENT OF UROLOGIC SCIENCES GRAND Resident PGY-4 April 1 Urology Faculty, Dr. Joel Teichman 8 Dr. Phyllis Kisa, Pediatric Surgery Fellow 15

Ollivier-Gooch, Carl

171

Microsoft Word - GrandCoulee_FinalEA_CommentResponses.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1679 December 2011 Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Revision Sheet for the Environmental Assessment 2 SUMMARY This revision sheet documents the changes to be incorporated into the Grand Coulee's Third Powerplant 500-kilovolt (kV) Transmission Line Replacement Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On May 2, 2011, the Preliminary EA was sent to agencies and interested parties.

172

GRR/Section 19-CO-h - Denver Basin and Designated Basin Permitting Process  

Open Energy Info (EERE)

9-CO-h - Denver Basin and Designated Basin Permitting Process 9-CO-h - Denver Basin and Designated Basin Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-h - Denver Basin and Designated Basin Permitting Process 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Ground Water Commission Colorado Division of Water Resources Regulations & Policies CRS 37-90-107 Application for Use of Ground Water 2 CCR 410-1 Rules and Regulations for the Management and Control of Designated Ground Water Triggers None specified Click "Edit With Form" above to add content 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf

173

K Basins Sludge Treatment Process | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

K Basins Sludge Treatment Process K Basins Sludge Treatment Process Full Document and Summary Versions are available for download K Basins Sludge Treatment Process Summary - K...

174

K Basins Sludge Treatment Project Phase 1 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

K Basins Sludge Treatment Project Phase 1 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download K Basins Sludge Treatment Project...

175

Understanding and Predicting Changes in Precipitation and Water Availability Under the Influence of Large-Scale Circulation Patterns: Rio Grande and Texas  

E-Print Network [OSTI]

Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Approved by: Co-Chairs of Committee, Vijay P Singh John R Giardino Committee Members, Anthony T Cahill Gerald R North... and management. This dissertation focusses on the influence of two major large-scale circulation patterns, the El Ni?o Southern Oscillation (ENSO) and the Pacific Decadal Oscillation (PDO), on the Rio Grande basin and the state of Texas, US. Both study areas...

Khedun, Chundun 1977-

2012-12-11T23:59:59.000Z

176

Great Basin | Open Energy Information  

Open Energy Info (EERE)

Great Basin Great Basin Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Great Basin Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.609920257001,"lon":-114.0380859375,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

177

Denver Basin Map | Open Energy Information  

Open Energy Info (EERE)

Map Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Denver Basin Map Abstract This webpage contains a map of the Denver Basin. Published Colorado...

178

Coos Bay Field Gulf Coast Coal Region Williston Basin Illinois  

U.S. Energy Information Administration (EIA) Indexed Site

San Juan Basin C e n t r a l A p p a l a c h i a n B a s i n Michigan Basin Greater Green River Basin Black Warrior Basin North Central Coal Region Arkoma Basin Denver Basin...

179

Hydrogeochemical Indicators for Great Basin Geothemal Resources  

Broader source: Energy.gov [DOE]

Hydrogeochemical Indicators for Great Basin Geothemal Resources presentation at the April 2013 peer review meeting held in Denver, Colorado.

180

Grand Ridge Elementary Wind Project | Open Energy Information  

Open Energy Info (EERE)

Grand Ridge Elementary Wind Project Grand Ridge Elementary Wind Project Facility Grand Ridge Elementary Sector Wind energy Facility Type Community Wind Location WA Coordinates 47.545883°, -122.005714° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.545883,"lon":-122.005714,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Fernald Preserve Visitors Center Grand Opening and LEED Platinum  

Broader source: Energy.gov (indexed) [DOE]

Fernald Preserve Visitors Center Grand Opening and LEED Platinum Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to do three things here at Fernald: to close it, to clean it up and to give it back to the community. I'm proud to say we have fulfilled that commitment safely and ahead of schedule. Less than two years ago, I was here with Secretary Bodman as he announced the completion of a $4.4 billion clean up operation. Since then, we have

182

Grand Marais PUC - Residential Energy Efficiency Rebate Program |  

Broader source: Energy.gov (indexed) [DOE]

Grand Marais PUC - Residential Energy Efficiency Rebate Program Grand Marais PUC - Residential Energy Efficiency Rebate Program Grand Marais PUC - Residential Energy Efficiency Rebate Program < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount CFLs: $2/bulb or up to 50% of cost LEDs: $10 - $15/bulb Lighting Fixtures: $15 - $20/fixture Refrigerators: $25, plus $50 for recycling an old, working unit Freezers: $25, plus $50 for recycling an old, working unit Dishwashers: $25 Clothes Washers: $50 Dehumidifiers: $65 Room A/C: $25, plus $25 for recycling an old, working unit Central A/C: $100 - $200, plus additional rebate for efficiency ratings

183

GreenHunter Biodiesel Refinery Grand Opening | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer Today, Acting Deputy Secretary Jeffrey Kupfer delivered remarks at the launch of GreenHunter Energy's biodiesel refinery, which will be the nation's single largest biodiesel refinery, producing 105 million gallons of "white-water" B100 biodiesel per year. Thank you Gary. I'm pleased to join with Governor Perry, Congressmen Green and Lampson, and Mayor Garcia in celebrating this important occasion. Today, as we open the nation's largest biodiesel refinery, we reach another milestone in our effort to make America more energy secure. As you know, global energy demand is surging. We must act swiftly and aggressively to

184

Fernald Preserve Visitors Center Grand Opening and LEED Platinum  

Broader source: Energy.gov (indexed) [DOE]

Fernald Preserve Visitors Center Grand Opening and LEED Platinum Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to do three things here at Fernald: to close it, to clean it up and to give it back to the community. I'm proud to say we have fulfilled that commitment safely and ahead of schedule. Less than two years ago, I was here with Secretary Bodman as he announced the completion of a $4.4 billion clean up operation. Since then, we have

185

Moreau-Grand Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Moreau-Grand Electric Coop Inc Moreau-Grand Electric Coop Inc Jump to: navigation, search Name Moreau-Grand Electric Coop Inc Place South Dakota Utility Id 12915 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO Other Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Industrial Small General Service Single Phase Commercial Small General Service Single Phase Well Commercial Small General Service Three Phase Commercial Average Rates Residential: $0.1090/kWh Commercial: $0.0798/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

186

City of Grand Junction, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Junction City of Grand Junction City of Place Iowa Utility Id 7486 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Commercial Demand Service Commercial Residential Eletric Residential Average Rates Residential: $0.1340/kWh Commercial: $0.1300/kWh Industrial: $0.0899/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Grand_Junction,_Iowa_(Utility_Company)&oldid=409673

187

Microsoft Word - CX-GrandCoulee-Creston_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Robert Keudell Robert Zeller Lineman Foreman III - TFWK-Grand Coulee Lineman Foreman I - TFWK-Grand Coulee Proposed Action: Selected wood pole replacement and minor access road maintenance along the Grand Coulee-Creston transmission line at miles 14, 15, 21 and 28. PP&A Project No: 1828 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures... in a condition suitable for a facility to be used for its designed purpose.

188

Mutagenic potential of sediments from the Grand Calumet River  

SciTech Connect (OSTI)

The Grand Calumet River/Indiana Harbor Canal is one of the International Joint Commission's Great Lakes Areas of Concern (AOC). Like many other AOCs, the Grand Calumet River is in a heavily industrialized area and has a history of chemical contamination. Many of the chemicals found in the industrial and municipal wastes that enter the waterway end up in sediment where they are concentrated to high levels. In order to assess the potential genotoxicity of sediments from the Grand Calumet River, the authors determined the mutagenic potential of organic extracts of sediments. The sediment extracts were assayed in the Salmonella/microsome mutagenicity test. In the Ames test, all ten sediment samples assayed were found to be mutagenic. In general, chemicals found in the sediments required metabolic activation before a positive mutagenic response was observed.

Maccubbin, A.E.; Ersing, N. (Roswell Park Cancer Inst., Buffalo, NY (United States))

1991-08-01T23:59:59.000Z

189

Winners Announced for the NNSA Grand Challenge Competition | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Winners Announced for the NNSA Grand Challenge Competition Winners Announced for the NNSA Grand Challenge Competition Winners Announced for the NNSA Grand Challenge Competition December 11, 2013 - 1:23pm Addthis President Carlton Brown of Clark Atlanta University pictured here with winning students junior Jules Henry (Electrical Engineering/Computer Science) and sophomore KeAndra Goodman (Electrical Engineering/Physics). President Carlton Brown of Clark Atlanta University pictured here with winning students junior Jules Henry (Electrical Engineering/Computer Science) and sophomore KeAndra Goodman (Electrical Engineering/Physics). Annie Whatley Annie Whatley Deputy Director, Office of Minority Economic Impact The first year of the Minority Serving Institution Partnership Program with the Department of Energy site Kansas City Plant was a fruitful one. The two

190

Atlas of the Columbia River Basin  

E-Print Network [OSTI]

#12;Atlas of the Columbia River Basin Oregon State University Computer-Assisted Cartography Course & GEOVISUALIZATION GROUP UNIVERSITY #12;2013 Oregon State University Atlas of the Columbia River Basin FOREWORDAtlas, Montana, Nevada, Wyoming, and Utah. 2013 Oregon State University Atlas of the Columbia River Basin

Jenny, Bernhard

191

LAND USE AND OWNERSHIP, WILLISTON BASIN  

E-Print Network [OSTI]

Chapter WM LAND USE AND OWNERSHIP, WILLISTON BASIN By T.T. Taber and S.A. Kinney In U.S. Geological........................................WM-1 Map Information for the Williston Basin Land Use And Land Cover Map.........................................................WM-2 Map Information for the Williston Basin Subsurface Ownership map

192

Huisartsen willen met minister rond de tafel  

Science Journals Connector (OSTI)

De Landelijke Huisartsen Vereniging (LHV) heeft in een brief minister Schippers van VWS opgeroepen tot gezamenlijk overleg. De minister wil de huisartsen korten op hun budget. Volgens de artsen komt daardoor d...

2012-02-01T23:59:59.000Z

193

NILE BASIN INITIATIVE Claire Stodola  

E-Print Network [OSTI]

· Climate Change #12;Upstream states · Low water needs Downstream states · High water needs #12;Historical #12;Research Question How has the Nile Basin Initiative influenced the riparian states' management states 1959 ­ Still only BILATERAL 1960s to 1990s - Increasing frustration by upstream states #12;What

New Hampshire, University of

194

Tropical forests: Include Congo basin  

Science Journals Connector (OSTI)

... 478, 378–381; 2011). But their meta-analysis of 138 studies overlooks the Congo basin, the second-largest continuous area of rainforest in the world; moreover, only ... the lack of recent and accessible legacy data for this region. The Democratic Republic of Congo (DRC), which contains 98 million hectares of rainforest (60% of the ...

Hans Verbeeck; Pascal Boeckx; Kathy Steppe

2011-11-09T23:59:59.000Z

195

GOLF COURSES FRASER RIVER BASIN  

E-Print Network [OSTI]

practices (BMP's) for golf courses, entitled Greening your BC Golf Course. A Guide to Environmental. It also summarizes conditions and practices in the Fraser Basin, reviews best management practices.C. Prepared by: UMA ENVIRONMENTAL A Division of UMA Engineering Ltd. Burnaby, B.C. March 1996 #12;THIRD PARTY

196

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O'Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

2003-01-01T23:59:59.000Z

197

The verifying compiler: A grand challenge for computing research  

Science Journals Connector (OSTI)

This contribution proposes a set of criteria that distinguish a grand challenge in science or engineering from the many other kinds of short-term or long-term research problems that engage the interest of scientists and engineers. As an example drawn ...

Tony Hoare

2003-01-01T23:59:59.000Z

198

Ouverture des portes : Plonge dans le Grand Bleu... Activits libres  

E-Print Network [OSTI]

Ouverture des portes : Plongée dans le Grand Bleu... Activités libres : · Présentations de nos ... Fermeture des portes 10h En Continu 17h 10h - 12h 14h - 15h 17h 15h - 17h Samedi 10 mai 2014 Portes ouvertes

199

SEDIMENT FLUX THROUGH THE RIO GRANDE RIVER: A MONSOONAL EFFECT  

E-Print Network [OSTI]

SEDIMENT FLUX THROUGH THE RIO GRANDE RIVER: A MONSOONAL EFFECT Troy C.Hiatt A thesis submitted University August 2010 Copyright © 2010 Troy C. Hiatt All Rights Reserved #12;ABSTRACT Sediment Flux through Climate has historically been recognized as an influence on sediment flux and deposition. The North

Seamons, Kent E.

200

Creativity Support Tools: A Grand Challenge for HCI Researchers  

E-Print Network [OSTI]

the innovations from engineering, software development, and user interface design. Finally, creativity manifestsCreativity Support Tools: A Grand Challenge for HCI Researchers Ben Shneiderman Department can play a key role in design- ing, implementing, and evaluating a new generation of creativity

Shneiderman, Ben

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

SunShot Grand Challenge Summit and Peer Review 2014  

Broader source: Energy.gov [DOE]

The 2014 SunShot Grand Challenge Summit and Peer Review brought together more than 800 members of the solar community to review the progress made toward the SunShot goal and discuss the challenges ahead to make solar energy more affordable and widespread across America. Download the Summit conference presentations here.

202

Data Mining: Data Analysis on a Grand Scale? Padhraic Smyth  

E-Print Network [OSTI]

Data Mining: Data Analysis on a Grand Scale? Padhraic Smyth Information and Computer Science for Statistical Methods in Medical Research, September 2000 1 #12;Abstract Modern data mininghas evolvedlargelyas aresult ofe orts bycomputer scientists to address the needs of data owners" in extracting useful

Smyth, Padhraic

203

THE ADVANCED CHEMISTRY BASINS PROJECT  

SciTech Connect (OSTI)

In the next decades, oil exploration by majors and independents will increasingly be in remote, inaccessible areas, or in areas where there has been extensive shallow exploration but deeper exploration potential may remain; areas where the collection of data is expensive, difficult, or even impossible, and where the most efficient use of existing data can drive the economics of the target. The ability to read hydrocarbon chemistry in terms of subsurface migration processes by relating it to the evolution of the basin and fluid migration is perhaps the single technological capability that could most improve our ability to explore effectively because it would allow us to use a vast store of existing or easily collected chemical data to determine the major migration pathways in a basin and to determine if there is deep exploration potential. To this end a the DOE funded a joint effort between California Institute of Technology, Cornell University, and GeoGroup Inc. to assemble a representative set of maturity and maturation kinetic models and develop an advanced basin model able to predict the chemistry of hydrocarbons in a basin from this input data. The four year project is now completed and has produced set of public domain maturity indicator and maturation kinetic data set, an oil chemistry and flash calculation tool operable under Excel, and a user friendly, graphically intuitive basin model that uses this data and flash tool, operates on a PC, and simulates hydrocarbon generation and migration and the chemical changes that can occur during migration (such as phase separation and gas washing). The DOE Advanced Chemistry Basin Model includes a number of new methods that represent advances over current technology. The model is built around the concept of handling arbitrarily detailed chemical composition of fluids in a robust finite-element 2-D grid. There are three themes on which the model focuses: chemical kinetic and equilibrium reaction parameters, chemical phase equilibrium, and physical flow through porous media. The chemical kinetic scheme includes thermal indicators including vitrinite, sterane ratios, hopane ratios, and diamonoids; and a user-modifiable reaction network for primary and secondary maturation. Also provided is a database of type-specific kerogen maturation schemes. The phase equilibrium scheme includes modules for primary and secondary migration, multi-phase equilibrium (flash) calculations, and viscosity predictions.

William Goddard; Peter Meulbroek; Yongchun Tang; Lawrence Cathles III

2004-04-05T23:59:59.000Z

204

EA-1338: Transfer of the Department of Energy Grand Junction Office to  

Broader source: Energy.gov (indexed) [DOE]

8: Transfer of the Department of Energy Grand Junction Office 8: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 25, 2000 EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 25, 2000 EA-1338: Final Environmental Assessment Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership

205

Solar Community Comes Out in Full Force for SunShot Grand Challenge...  

Office of Environmental Management (EM)

Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 9:58am Addthis...

206

Charging Up For Formula Sun Grand Prix By Jonathan Nutzmann, Project Manager  

E-Print Network [OSTI]

Charging Up For Formula Sun Grand Prix By Jonathan Nutzmann, Project Manager The team is currently busy with training for our next race, Formula Sun Grand Prix, which is com- ing up May 2nd-7th

Janssen, Michel

207

PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc | Department...  

Broader source: Energy.gov (indexed) [DOE]

Permit and Electricity Export Authorization for Rio Grande Electric Cooperative to Export electricity to Mexico. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc More...

208

Geology of interior cratonic sag basins  

SciTech Connect (OSTI)

Interior cratonic sag basins are thick accumulations of sediment, generally more or less oval in shape, located entirely in the interiors of continental masses. Some are single-cycle basins and others are characterized by repeated sag cycles or are complex polyhistory basins. Many appear to have developed over ancient rift systems. Interior cratonic sag basins are typified by a dominance of flexural over fault-controlled subsidence, and a low ratio of sediment volume to surface area of the basin. The Baltic, Carpentaria, Illinois, Michigan, Parana, Paris, and Williston basins are examples of interior cratonic sag basins. Tectonics played a dominant role in controlling the shapes and the geometries of the juxtaposed packets of sedimentary sequences. While the mechanics of tectonic control are not clear, evidence suggests that the movements are apparently related to convergence of lithospheric plates and collision and breakup of continents. Whatever the cause, tectonic movements controlled the freeboard of continents, altering base level and initiating new tectono-sedimentologic regimes. Sag basins situated in low latitudes during their development commonly were sites of thick carbonates (e.g., Illinois, Michigan, Williston, and Paris basins). In contrast, siliciclastic sedimentation characterized basins that formed in higher latitudes (e.g., Parana and Carpentaria basins). Highly productive sag basins are characterized by widespread, mature, organic-rich source rocks, large structures, and good seals. Nonproductive basins have one or more of the following characteristics: immature source rocks, leaky plumbing, freshwater flushing, and/or complex geology due to numerous intrusions that inhibit mapping of plays.

Leighton, M.W.; Eidel, J.J.; Kolata, D.R.; Oltz, D.F. (Illinois Geological Survey, Champaign (USA))

1990-05-01T23:59:59.000Z

209

Structurally dependent source rock maturity and kerogen facies, Estancia Basin, New Mexico  

SciTech Connect (OSTI)

The Estancia basin of central New Mexico is an asymmetric, north-south trending structural depression that originated during the Pennsylvanian. The present-day basin covers 1,600 mi{sup 2} (4,100 km{sup 2}). It is bounded on the east by the late Paleozoic Pedernal uplift, on the west by the Tertiary-age Manzano and Los Pinos Mountains, on the north by the Espanola basin, and on the south by Chupadera Mesa. Depth to Precambrian basement ranges from 9,000 ft (2,700 m) in a narrow graben in the eastern part of the basin to less than 1,500 ft (460 m) on a shelf to the west. Basin fill consists primarily of Pennsylvanian and Wolfcampian sandstones and shales in the graben and sandstones, shales, and marine limestones on the shelf Mature to marginally mature dark-gray to black Pennsylvanian shales are probable source rocks. Thermal Alteration Index ranges from 2.0 to 3.2. Shales become thermally mature with depth in the eastern graben. On the western shelf, shales become mature to the west as a result of increased heating from the Rio Grande rift. Total organic carbon exceeds 0.5% in many shales, sufficient for hydrocarbon generation. Kerogen types are mixed algal, herbaceous, and woody, indicating that gas, or possibly gas mixed with oil, was generated. Kerogens in shales of the eastern graben are entirely continental, gas-prone types. In limestones and shales of the western shelf, kerogens have a mixed marine and continental provenance, indicating that both oil and gas may have been generated on thermally mature parts of the shelf.

Broadhead, R.F. [New Mexico Institute of Mines and Mineral Resources, Socorro, NM (United States)

1995-06-01T23:59:59.000Z

210

Alkali attack on a mullite refractory in the Grand Forks Energy Technology Center slagging gasifier  

Science Journals Connector (OSTI)

A mullite refractory lining in the Grand Forks Energy Technology Center slagging gasifier cracked and spoiled after intermittent exposure to...

C. R. Kennedy

1981-06-01T23:59:59.000Z

211

Grand Challenge for Basic and Applied Research in Hydrogen Storage: Statement of Objectives  

Broader source: Energy.gov [DOE]

Statement of objectives for the Grand Challenge for Basic and Applied Research in Hydrogen Storage issued in 2003.

212

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.  

SciTech Connect (OSTI)

The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.

Crossley, Brian (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA); Lockwood, Jr., Neil W. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA)

2001-01-01T23:59:59.000Z

213

Expansion of Urban Area in Irrigation Districts of the Rio Grande River Basin, 1996 - 2006: A Map Series  

E-Print Network [OSTI]

The border region of Texas is experiencing rapid urban growth which is expected to have a continuing and increasing impact on the irrigation districts of the region. This report presents an analysis of the expansion of urban area during the ten year...

Leigh, Eric; Barroso, M.; Fipps, G.

214

East Grand St Bridge Snowmelt Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Bridge Snowmelt Low Temperature Geothermal Facility Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East Grand St Bridge Sector Geothermal energy Type Snowmelt Location Laramie, Wyoming Coordinates 41.3113669°, -105.5911007° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

215

Grand Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Grand Ridge II Wind Farm Facility Grand Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

216

City of Grand Island, Nebraska (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Island City of Grand Island City of Place Nebraska Utility Id 40606 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Flood Lighting Lighting Commercial Rate- Single Phase Commercial Commercial Rate- Three Phase Commercial Residential Rate Residential Three Phase Power Service Industrial

217

City of Grand Haven, Michigan (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Haven Grand Haven Place Michigan Utility Id 7483 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Space Lighting Service - 100 Watt Lighting Area Space Lighting Service - 1000 Watt Lighting Area Space Lighting Service - 175 Watt Mercury Vapor Lighting Area Space Lighting Service - 400 Watt Mercury Vapor Lighting Area Space Lighting Service - Metal Halide 175 Watt Lighting

218

Arroyo Grande, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Arroyo Grande, California: Energy Resources Arroyo Grande, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.1185868°, -120.5907252° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1185868,"lon":-120.5907252,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

219

Rio Grande Electric Coop, Inc (New Mexico) | Open Energy Information  

Open Energy Info (EERE)

New Mexico) New Mexico) Jump to: navigation, search Name Rio Grande Electric Coop, Inc Place New Mexico Utility Id 16057 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.1560/kWh Commercial: $0.1630/kWh Industrial: $0.1170/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File2_2010" Retrieved from "http://en.openei.org/w/index.php?title=Rio_Grande_Electric_Coop,_Inc_(New_Mexico)&oldid=412780" Categories: EIA Utility Companies and Aliases Utility Companies Organizations Stubs What links here

220

Grand Forks, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Grand Forks, North Dakota: Energy Resources Grand Forks, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.9252568°, -97.0328547° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.9252568,"lon":-97.0328547,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

City of Grand Rapids Building Solar Roof Demonstration  

SciTech Connect (OSTI)

Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

DeClercq, Mark; Martinez, Imelda

2012-08-31T23:59:59.000Z

222

THE INTRACONTINENTAL BASINS (ICONS) ATLAS APPLICATIONS IN EASTERN AUSTRALIA PESA Eastern Australasian Basins Symposium III Sydney, 1417 September, 2008 275  

E-Print Network [OSTI]

THE INTRACONTINENTAL BASINS (ICONS) ATLAS ­ APPLICATIONS IN EASTERN AUSTRALIA PESA Eastern Australasian Basins Symposium III Sydney, 14­17 September, 2008 275 The IntraCONtinental basinS (ICONS) atlas of intracontinental basins (ICONS atlas), using freely available global and regional datasets. Firstly, we are trying

Müller, Dietmar

223

Rio Grande Wild Turkey in Texas: Biology and Management  

E-Print Network [OSTI]

). Breeding in Rio Grande wild turkeys in Texas usually begins in early spring in southern Texas and continues through July and August in central and northern Texas (Table 1). After breeding, hens seek out potential nesting sites, such as thick grass... brush cover and structure. Mechanical methods kill the tops of plants, but many brush species vigorously re-sprout from the roots. Prescribed burning or spot treatments with herbicide can lengthen the life of the original treatment. Figure 19. When...

Cathey, James; Melton, Kyle; Dreibelbis, Justin; Cavney, Bob; Locke, Shawn; DeMaso, Stephen; Schwertner, T. Wayne; Collier, Bret

2007-09-11T23:59:59.000Z

224

Grand Challenges for Life-Cycle Assessment of Biofuels  

Science Journals Connector (OSTI)

Grand Challenges for Life-Cycle Assessment of Biofuels ... Both advocates and critics of biofuels often focus on a restricted set of scenarios that appear to reinforce their a priori beliefs about how biofuel production and use might function. ... Converting rain forest, peatland, savanna, or grassland to produce food crop-based biofuels in Brazil, southeast Asia, and the US creates a biofuel C debt by releasing 17-420 times more CO2 than the annual greenhouse gas (GHG) redns. ...

T. E. McKone; W. W. Nazaroff; P. Berck; M. Auffhammer; T. Lipman; M. S. Torn; E. Masanet; A. Lobscheid; N. Santero; U. Mishra; A. Barrett; M. Bomberg; K. Fingerman; C. Scown; B. Strogen; A. Horvath

2011-01-25T23:59:59.000Z

225

CD-1: Intracratonic Basin | Open Energy Information  

Open Energy Info (EERE)

thermal conductivity of salt rock, and might provide suitable geothermal reservoirs for district heating.4 Formations encountered in deeper parts of an intracratonic basin...

226

Hack's law of debris-flow basins  

Science Journals Connector (OSTI)

Hack's law was originally derived from basin statistics for varied spatial scales and regions. The exponent value of the law has been shown to vary between 0.47 and 0.70, causing uncertainty in its application. This paper focuses on the emergence of Hack's law from debris-flow basins in China. Over 5,000 debris-flow basins in different regions of China with drainage areas less than 100km2 are included in this study. Basins in the different regions are found to present similar distributions. Hack's law is derived from maximum probability and conditional distributions, suggesting that the law should describe some critical state of basin evolution. Results suggest the exponent value is approximately 0.5. Further analysis indicates that Hack's law is related to other scaling laws underlying the evolution of a basin and that the exponent is not dependent on basin shape but rather on the evolutionary stage. A case study of a well known debris-flow basin further confirms Hack's law and its implications in basin evolution.

Yong LI; Z.Q. YUE; C.F. LEE; R.E. BEIGHLEY; Xiao-Qing CHEN; Kai-Heng HU; Peng CUI

2009-01-01T23:59:59.000Z

227

NMOSE Basin Guidelines | Open Energy Information  

Open Energy Info (EERE)

OtherOther: NMOSE Basin GuidelinesLegal Abstract The New Mexico Office of the State Engineer (NMOSE) provides links to final rules and administrative guidelines for particular...

228

his summer marked the grand re-opening  

E-Print Network [OSTI]

trout and Kokanee salmon and other fish desired for planting in the Lake Tahoe Basin. Dr. Charles 2400 Lake Forest Road Tahoe City, CA 96145 Phone: (530) 583-3279 Fax: (530) 583-2417 http://terc.ucdavis.edu Dedication of the UC Davis Tahoe City Field Station Dr. Charles Goldman addresses a crowd of 180 at the Tahoe

Schladow, S. Geoffrey

229

Transient hydrodynamics within intercratonic sedimentary basins during glacial cycles  

E-Print Network [OSTI]

ka B.P.), such as the Williston, Michigan, and Illinois basins. We show that in such basins fluid of the Williston and Alberta basins. Under such con- ditions fluid fluxes in aquifers can be expected

Bense, Victor

230

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

2003-09-01T23:59:59.000Z

231

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2005-11-01T23:59:59.000Z

232

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2006-02-01T23:59:59.000Z

233

CRAD, Engineering - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System...

234

CRAD, Conduct of Operations - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System May 2004 A...

235

CRAD, Management - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD,...

236

CRAD, Emergency Management - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section...

237

Refraction Survey At Northern Basin & Range Region (Heimgartner...  

Open Energy Info (EERE)

Northern Basin & Range Region (Heimgartner, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Northern Basin &...

238

Geographic Information System At Northern Basin & Range Region...  

Open Energy Info (EERE)

Activity: Geographic Information System At Northern Basin & Range Region (Nash & Johnson, 2003) Exploration Activity Details Location Northern Basin and Range Geothermal...

239

Geographic Information System At Nw Basin & Range Region (Nash...  

Open Energy Info (EERE)

Geographic Information System At Nw Basin & Range Region (Nash & Johnson, 2003) Exploration Activity Details Location Northwest Basin and Range Geothermal Region Exploration...

240

Ecology: Drought in the Congo Basin  

Science Journals Connector (OSTI)

... significantly expanded the tropical-forest research programme by focusing on chronic drought in Africa's Congo Basin, a region that has been the subject of much less investigation than the ... optical, microwave and gravity remote-sensing data to evaluate long-term drought response in the Congo Basin (Fig. 1). Annual precipitation in this region is bimodal, and the ...

Jeffrey Q. Chambers; Dar A. Roberts

2014-04-23T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

6, 839877, 2006 Mexico City basin  

E-Print Network [OSTI]

emitters of air pollutants leading to negative health effects and environmental degradation. The rate altitude basin with air pollutant concentrations above the health limits most days of the year. A mesoscale-dimensional wind patterns in25 the basin and found that the sea-breeze transports the polluted air mass up the moun

Boyer, Edmond

242

EIS-0265-SA-79: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

relocate 4,500 feet of existing dike along the Grande Ronde River, re-create native wetlands, relocate an existing powerline, and establish a riparian forest buffer. Supplement...

243

EIS-0265-SA-99: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis 9: Supplement Analysis EIS-0265-SA-99: Supplement Analysis Watershed Management Program The overall objective of the project is to restore as much as possible, the natural character and function of the Longley Meadows wetland complex. This project is a joint partnership among the CTUIR, Grand Rhonda Model Watershed Program, Oregon Department of Fish and Wildlife, Natural Resource Conservation Service, U.S. Department of Agriculture, and BPA. This project involves several separate components that are part of a regionwide effort to protect and restore anadromous fish habitat in the Grand Ronde Basin Supplement Analysis for the Watershed Management Program Environmental Impact Statement (November 2002), DOE/EIS-0265-SA-99 More Documents & Publications EA-1173-SA-01: Supplement Analysis

244

Neutrino oscillations, supersymmetric grand unification, and B decay  

Science Journals Connector (OSTI)

The effects of supersymmetric particles on flavor changing neutral current and lepton flavor violating processes are studied in supersymmetric SU(5) grand unified theory with right-handed neutrino supermultiplets. Using input parameters motivated by neutrino oscillation, it is shown that the time-dependent CP asymmetry of radiative B decay can be as large as 25% when the ???? branching ratio becomes close to the present experimental upper bound. We also show that the Bs–Bs mixing can be significantly different from the presently allowed range in the standard model.

Seungwon Baek; Toru Goto; Yasuhiro Okada; Ken-ichi Okumura

2001-01-23T23:59:59.000Z

245

SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar  

Broader source: Energy.gov (indexed) [DOE]

SunShot Grand Challenge Highlights Ambitious Efforts along the SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Ramamoorthy Ramesh Former Director, SunShot Initiative & Solar Energy Technologies Program What are the key facts? Today at the SunShot Grand Challenge Summit Energy Secretary Chu announced up to $8 million to support clean energy startups. Secretary Chu also announced a nationwide competition to drive down

246

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-09-30T23:59:59.000Z

247

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2003-09-30T23:59:59.000Z

248

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2005-09-30T23:59:59.000Z

249

Geomorphology of plutonium in the Northern Rio Grande  

SciTech Connect (OSTI)

Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

Graf, W.L. [Arizona Univ., Tempe, AZ (United States). Dept., of Geography

1993-03-01T23:59:59.000Z

250

Grand Unification as a Bridge Between String Theory and Phenomenology  

SciTech Connect (OSTI)

In the first part of the talk, I explain what empirical evidence points to the need for having an effective grand unification-like symmetry possessing the symmetry SU(4)-color in 4D. If one assumes the premises of a future predictive theory including gravity--be it string/M theory or a reincarnation--this evidence then suggests that such a theory should lead to an effective grand unification-like symmetry as above in 4D, near the string-GUT-scale, rather than the standard model symmetry. Advantages of an effective supersymmetric G(224) = SU(2){sub L} x SU(2){sub R} x SU(4){sup c} or SO(10) symmetry in 4D in explaining (1) observed neutrino oscillations, (2) baryogenesis via leptogenesis, and (3) certain fermion mass-relations are noted. And certain distinguishing tests of a SUSY G(224) or SO(10)-framework involving CP and flavor violations (as in {mu} {yields} e{gamma}, {tau} {yields} {mu}{gamma}, edm's of the neutron and the electron) as well as proton decay are briefly mentioned. Recalling some of the successes we have had in our understanding of nature so far, and the current difficulties of string/M theory as regards the large multiplicity of string vacua, some comments are made on the traditional goal of understanding vis a vis the recently evolved view of landscape and anthropism.

Pati, Jogesh C.

2006-06-09T23:59:59.000Z

251

Anomalous Bottom Water South of the Grand Banks Suggests Turbidity Current Activity  

Science Journals Connector (OSTI)

...study in the North American basin, Biscaye and Eit-treim...the western North At-lantic basin can usually be seen in the water...margin of the North American basin should also be considered in...A. F. Amos, The New York Bight and Hudson Canyon in October...

ANTHONY F. AMOS; ROBERT D. GERARD

1979-03-02T23:59:59.000Z

252

K Basins isolation barriers summary report  

SciTech Connect (OSTI)

The 105-K East and 105-K West fuel storage basins (105-K Basins) were designed and constructed in the early 1950`s for interim storage of irradiated fuel following its discharge from the reactors. The 105-K- East and 105-K West reactor buildings were constructed first, and the associated storage basins were added about a year later. The construction joint between each reactor building structure and the basin structure included a flexible membrane waterstop to prevent leakage. Water in the storage basins provided both radiation shielding and cooling to remove decay heat from stored fuel until its transfer to the Plutonium Uranium Extraction (PUREX) Facility for chemical processing. The 105-K West Reactor was permanently shut down in February 1970; the 105-K East Reactor was permanently shut down in February 1971. Except for a few loose pieces, fuel stored in the basins at that time was shipped to the PUREX Facility for processing. The basins were then left idle but were kept filled with water. The PUREX Facility was shut down and placed on wet standby in 1972 while N Reactor continued to operate. When the N Reactor fuel storage basin began to approach storage capacity, the decision was made to modify the fuel storage basins at 105-K East and 105-K West to provide additional storage capacity. Both basins were subsequently modified (105-K East in 1975 and 105-K West in 1981) to provide for the interim handling and storage of irradiated N Reactor fuel. The PUREX Facility was restarted in November 1983 to provide 1698 additional weapons-grade plutonium for the United States defense mission. The facility was shut down and deactivated in December 1992 when the U.S. Department of Energy (DOE) determined that the plant was no longer needed to support weapons-grade plutonium production. When the PUREX Facility was shut down, approximately 2.1 x 1 06 kg (2,100 metric tons) of irradiated fuel aged 7 to 23 years was left in storage in the 105-K Basins pending a decision on final disposition of the material. The Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1994), also known as the Tri-Party Agreement, commits to the removal of all fuel and sludge from the 105-K Basins by the year 2002.

Strickland, G.C., Westinghouse Hanford

1996-07-31T23:59:59.000Z

253

Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit  

Broader source: Energy.gov [DOE]

A packed crowd of leaders across the solar community gathered in Anaheim, California, for the 2014 SunShot Grand Challenge Summit.

254

EV Everywhere EV Everywhere Grand Challenge- Electric Drive (Power Electronics and Electric Machines) Workshop Agenda  

Broader source: Energy.gov [DOE]

Agenda for the EV Everywhere Grand Challenge - Electric Drive Workshop on July 24, 2012 at the Doubletree O'Hare, Chicago, IL

255

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

256

EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Attendence List  

Broader source: Energy.gov [DOE]

Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

257

EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Agenda  

Broader source: Energy.gov [DOE]

Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

258

E-Print Network 3.0 - aux grandes echelles Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

11 Extraction en ondelettes des fluctuations turbulentes coherentes : application au plasma de bord du tokamak Tore-Supra Summary: ero aux echelles fines. Les grands...

259

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor .  

E-Print Network [OSTI]

??Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line… (more)

Dohm, James

2012-01-01T23:59:59.000Z

260

'Grand Challenge' for Basic and Applied Research in Hydrogen Storage Solicitation  

Broader source: Energy.gov [DOE]

DOE is issuing a Grand Challenge to the scientific community by soliciting Applications for research, development and demonstration of hydrogen storage materials and technologies. In addition to...

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 Mark Person*1  

E-Print Network [OSTI]

: Mount Simon, Illinois Basin, CO2, earthquakes, pressure, brine transport69 #12;Page | 3 1. IntroductionPage | 1 Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 2 3 4 sharp-interface models of CO2 injection were constructed for the Illinois49 Basin in which porosity

Gable, Carl W.

262

Death of a carbonate basin: The Niagara-Salina transition in the Michigan basin  

SciTech Connect (OSTI)

The A-O Carbonate in the Michigan basin comprises a sequence of laminated calcite/anhydrite layers intercalated with bedded halite at the transition between normal marine Niagaran carbonates and lower Salina Group evaporites. The carbonate/anhydrite interbeds represent freshing events during initial evaporative concentration of the Michigan basin. Recent drilling in the Michigan basin delineates two distinct regions of A-O Carbonate development: a 5 to 10 m thick sequence of six 'laminites' found throughout most of the western and northern basin and a 10 to 25 m thick sequence in the southeastern basin containing both thicker 'laminates' and thicker salt interbeds. Additionally, potash deposits of the overlying A-1 evaporite unit are restricted to the northern and western basin regions. The distribution of evaporite facies in these two regions is adequately explained by a source of basin recharge in the southeast-perhaps the 'Clinton Inlet' of earlier workers. This situation suggest either that: (1) the source of basin recharge is alternately supplying preconcentrated brine and more normal marine water, or (2) that the basin received at least two distinct sources of water during A-O deposition.

Leibold, A.W.; Howell, P.D. (Univ. of Michigan, Ann Arbor (United States))

1991-03-01T23:59:59.000Z

263

Hinsdale Wave Basin 1 | Open Energy Information  

Open Energy Info (EERE)

Hinsdale Wave Basin 1 Hinsdale Wave Basin 1 Jump to: navigation, search Basic Specifications Facility Name Hinsdale Wave Basin 1 Overseeing Organization Oregon State University Hydrodynamics Hydrodynamic Testing Facility Type Wave Basin Length(m) 104.0 Beam(m) 3.7 Depth(m) 4.6 Cost(per day) $3500 Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 1.8 Maximum Wave Height(m) at Wave Period(s) 10.0 Wave Period Range(s) 10.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Monochromatic waves (cnoidal, Stokes, Airy), solitary waves, user-defined free surface timeseries or board displacement timeseries for random waves Wave Direction Uni-Directional Simulated Beach Yes Description of Beach 12' by 12' concrete slabs anchored to flume walls

264

K Basins Sludge Treatment Project Phase 1  

Broader source: Energy.gov (indexed) [DOE]

K Basins Sludge Treatment Project Phase 1 K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment Report Herb G. Sutter Michael Poirier Art W. Etchells Gary Smith Kris Thomas Jim J. Davis Paul Macbeth November 16, 2009 Prepared by the U.S. Department of Energy Washington, D.C. K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment Report November 16, 2009 ii Herbert G. Sutter, Team Lead Date Michael Poirier, Team Member Date Arthur W. Etchells, Team Member Date Gary Smith, Team Member Date Kris Thomas, Team Member Date Jim J. Davis, Team Member Date Paul Macbeth, Team Member Date Signatures 11/09/2009 11/09/2009 11/09/2009 K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment Report November 16, 2009

265

Alden Wave Basin | Open Energy Information  

Open Energy Info (EERE)

Wave Basin Wave Basin Jump to: navigation, search Basic Specifications Facility Name Alden Wave Basin Overseeing Organization Alden Research Laboratory, Inc Hydrodynamic Testing Facility Type Wave Basin Length(m) 33.5 Beam(m) 21.3 Depth(m) 1.2 Water Type Freshwater Cost(per day) Depends on study Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.3 Maximum Wave Height(m) at Wave Period(s) 1.0 Maximum Wave Length(m) 1.8 Wave Period Range(s) 1.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Period adjustable electronically, height adjustable mechanically Wave Direction Both Simulated Beach Yes Description of Beach Designed as needed using commercially available sand/sediment

266

Progress Update: H4 Basin Concrete Pour  

ScienceCinema (OSTI)

The Recovery Act funded project in the H area basin. A concrete ditch built longer than half a mile to prevent contaminated water from expanding and to reduce the footprint on the environment.

None

2012-06-14T23:59:59.000Z

267

Flathead Basin Commission Act of 1983 (Montana)  

Broader source: Energy.gov [DOE]

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

268

The Uinta Basin Case Robert J. Bayer  

E-Print Network [OSTI]

Overburden Tailings Oil Shale Mining Open Pit Underground Ex situ extraction Ex situ thermal conversion EIS for Oil Sands and Oil Shale Ongoing concerns with Basin-wide air quality Wildlife and wildlife

Utah, University of

269

Sheets Wave Basin | Open Energy Information  

Open Energy Info (EERE)

Sheets Wave Basin Sheets Wave Basin Jump to: navigation, search Basic Specifications Facility Name Sheets Wave Basin Overseeing Organization University of Rhode Island Hydrodynamic Testing Facility Type Wave Basin Length(m) 30.0 Beam(m) 3.6 Depth(m) 1.8 Cost(per day) $750(+ Labor/Materials) Towing Capabilities Towing Capabilities Yes Maximum Velocity(m/s) 2.0 Length of Effective Tow(m) 25.0 Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.3 Maximum Wave Height(m) at Wave Period(s) 3.0 Maximum Wave Length(m) 10 Wave Period Range(s) 3.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Pre-programmed for regular and irregular waves, but wavemaker is capable of any input motion. Wave Direction Uni-Directional

270

Haynes Wave Basin | Open Energy Information  

Open Energy Info (EERE)

Wave Basin Wave Basin Jump to: navigation, search Basic Specifications Facility Name Haynes Wave Basin Overseeing Organization Texas A&M (Haynes) Hydrodynamic Testing Facility Type Wave Basin Length(m) 38.1 Beam(m) 22.9 Depth(m) 1.5 Water Type Freshwater Cost(per day) $150/hour (excluding labor) Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.6 Maximum Wave Height(m) at Wave Period(s) 3.3 Maximum Wave Length(m) 10.7 Wave Period Range(s) 3.3 Current Velocity Range(m/s) 0.2 Programmable Wavemaking Yes Wavemaking Description Directional, irregular, any spectrum, cnoidal or solitary wave Wave Direction Both Simulated Beach Yes Description of Beach Stone Channel/Tunnel/Flume Channel/Tunnel/Flume None

271

Assessment of undiscovered carboniferous coal-bed gas resources of the Appalachian Basin and Black Warrior Basin Provinces, 2002  

SciTech Connect (OSTI)

Coalbed methane (CBM) occurs in coal beds of Mississippian and Pennsylvanian (Carboniferous) age in the Appalachian basin, which extends almost continuously from New York to Alabama. In general, the basin includes three structural subbasins: the Dunkard basin in Pennsylvania, Ohio, and northern West Virginia; the Pocahontas basin in southern West Virginia, eastern Kentucky, and southwestern Virginia; and the Black Warrior basin in Alabama and Mississippi. For assessment purposes, the Appalachian basin was divided into two assessment provinces: the Appalachian Basin Province from New York to Alabama, and the Black Warrior Basin Province in Alabama and Mississippi. By far, most of the coalbed methane produced in the entire Appalachian basin has come from the Black Warrior Basin Province. 8 refs., 1 fig., 1 tab.

Milici, R.C.; Hatch, J.R.

2004-09-15T23:59:59.000Z

272

Phanerozoic tectono-stratigraphic evolution of the Trans-Pecos and Permian basin regions (Mexico, Texas, New Mexico) using Landsat imagery, subsurface and outcrop data  

SciTech Connect (OSTI)

Integrating regional Landsat imagery, outcrop field studies, and subsurface data has resulted in a more comprehensive understanding and delineation of the tectono-stratigraphic evolution of the Trans-Pecos region. Landsat imagery were acquired and registered to the existing 1:25000 scale maps and mosaiced to create a regional view of the Trans-Pecos and Permian basin region. The imagery were used to extrapolate and map key stratigraphic and tectonic elements after calibration from documented outcrop and subsurface data. The interpretations aided in the extrapolation of scattered control information and were critical in the complete reconstruction of the geologic history of the area. The Trans-Pecos Phanerozoic history comprises five tectono-depositional phases, and these have controlled the shape of the modem landscape: (1) Late Proterozoic rifting (Gondwana from Laurentia), and development of the Early-Middle Paleozoic Tobosa basin; (2) Pennsylvanian collision (South and North Americas), and differentiation of the Tobosa basin into the Midland, Delaware, Orogrande, and Pedregosa basins separated by basement blocks: Central Basin Platform, Diablo Platform, Burro-Florida Platform; (3) Middle Mesozoic transtensional rifting (Mexico from North America), and Late Jurassic failed rifting of the Mexican Chihuahua and Coahuila Troughs west and south of the Diablo Platform; (4) Late Mesozoic Laramide collision (Mexico and Texas), and development of the Chihuahua fold/thrust belt limited by the western margin of the Diablo Platform; (5) Late Cenozoic North American basin and Range rifting, and development of Rio Grande grabens, block-faulted mountains, and volcanics. The Tobosa basin was a passive-margin interior sag; its continental margin was south of the Marathons.

Markello, J.R.; Sarg, J.F. [Mobil Technology Corporation, Dallas, TX (United States)

1996-08-01T23:59:59.000Z

273

City of Grand Marais, Minnesota (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Marais, Minnesota (Utility Company) Marais, Minnesota (Utility Company) Jump to: navigation, search Name City of Grand Marais Place Minnesota Utility Id 7487 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL - SINGLE PHASE Commercial COMMERCIAL - THREE PHASE Commercial DUAL FUEL(Single Phase) DUAL FUEL(Three Phase) RESIDENTIAL - SINGLE PHASE Residential RESIDENTIAL - THREE PHASE Residential YARD LIGHT METERED Lighting YARD LIGHT UNMETERED Lighting

274

Grand Valley Rrl Pwr Line, Inc | Open Energy Information  

Open Energy Info (EERE)

Pwr Line, Inc Pwr Line, Inc Jump to: navigation, search Name Grand Valley Rrl Pwr Line, Inc Place Colorado Utility Id 7563 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial and Small Power Service, Three Phase Schedule (25)-CSP-1 Commercial Farm and Home (Residential) Service Schedule (10)-FH-1 Residential Industrial Service Schedule (50) -IND-1 Industrial Irrigation Service Schedule (40)-I-1 Commercial Large Power Service Schedule (30) -LP-1 Industrial Nonresidential - General Schedule (20)-NRG-1 Commercial

275

City of East Grand Forks, Minnesota (Utility Company) | Open Energy  

Open Energy Info (EERE)

Minnesota (Utility Company) Minnesota (Utility Company) Jump to: navigation, search Name East Grand Forks City of Place Minnesota Utility Id 5575 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Rate Commercial Off Peak Rates Commercial Residential Electric Heat Residential Residential General Electric Residential Small Commercial Rate Residential Average Rates Residential: $0.0943/kWh Commercial: $0.0740/kWh Industrial: $0.0789/kWh

276

EV Everywhere Grand Challenge - Electric Motors and Critical Materials Breakout  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electric Motors and Critical Electric Motors and Critical Materials Breakout Laura Marlino Oak Ridge National Laboratory Iver Anderson Ames Laboratory Facilitators July 24, 2012 EV Everywhere Grand Challenge Vehicle Technologies Program - Advanced Power Electronics and Electric Motors eere.energy.gov Electric Drive Status and Targets Current Status* PHEV 40** AEV 100** AEV 300+ System Cost $/kW 20 ($1100) 5 ($600) 14 ($1680) 4 ($600) Motor Specific Power kW/kg 1.3 1.9 1.5 2 PE Specific Power kW/kg 10.5 16 12 16.7 System Peak Efficiency % 90 97 91 98 2022 EV Everywhere Targets Extremely Aggressive Targets Especially Challenging for the Electric Motor * 55kW system ** 120kW system + 150 kW system Vehicle Technologies Program - Advanced Power Electronics and Electric Motors eere.energy.gov

277

Grand Ridge III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

III Wind Farm III Wind Farm Facility Grand Ridge III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

278

Grand Rapids Public Util Comm | Open Energy Information  

Open Energy Info (EERE)

Rapids Public Util Comm Rapids Public Util Comm Jump to: navigation, search Name Grand Rapids Public Util Comm Place Minnesota Utility Id 7489 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png CITY COMMERCIAL Commercial CITY LIGHT & POWER Lighting CITY RESIDENTIAL Residential CONTROLLED WATER HEATING (CITY) Commercial CONTROLLED WATER HEATING (RURAL) Commercial ENTERTAINMENT LIGHTING RATE (CITY) Lighting ENTERTAINMENT LIGHTING RATE (RURAL) Lighting INDUSTRIAL (CITY) Industrial

279

Mineralogy and organic petrology of oil shales in the Sangkarewang formation, Ombilin Basin, West Sumatra, Indonesia.  

E-Print Network [OSTI]

??The Ombilin Basin, which lies in Sumatra Island, is one of the Tertiary basins in Indonesia. This basin contains a wide variety of rock units,… (more)

Fatimah, Fatimah

2009-01-01T23:59:59.000Z

280

BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND COUNTY, COLORADO  

E-Print Network [OSTI]

BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND COUNTY, COLORADO Colorado Natural Heritage Program College of Natural Resources, 8002 Campus Delivery Colorado State University Fort Collins, Colorado 80523-8002 #12;BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Economic Essays on Water Resources Management of the Texas Lower Rio Grande Valley  

E-Print Network [OSTI]

's functionality are due to minimal return flows to the Rio Grande (River) occurring throughout the Valley, and the monitoring and enforcement efforts of the Rio Grande Watermaster Program. The final essay is a presentation of a hydroeconomic model to study...

Leidner, Andrew

2012-07-16T23:59:59.000Z

282

Magnetic Flux Transport Simulations of Solar Surface Magnetic Distributions During a Grand Minimum.  

E-Print Network [OSTI]

, Scotland, KY16 9SS. Abstract. It is well known that magnetic activity on the Sun modulates from one cycle strongly depend on the phase of the cycle in which the grand minimum starts and whether it lasts for an odd or even number of cycles. If the grand minimum starts around cycle minimum then a signi#12;cant amount

Mackay, Duncan

283

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration is preparing an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near O’Neill, Nebraska, to Western’s power transmission system. The project website is http://www.wapa.gov/ugp/Environment/GrandePrairie.htm.

284

Is There A Grand Challenge or X-Prize for Data Mining? Gregory Piatetsky-Shapiro  

E-Print Network [OSTI]

· Identifying all genes and potential therapeutic targets for cancer · A text-mining and understanding systemIs There A Grand Challenge or X-Prize for Data Mining? Gregory Piatetsky-Shapiro KDnuggets gps and motivating Grand Challenge problems for Data Mining, focusing on bioinformatics, multimedia mining, link

Grossman, Robert

285

Peak discharge of a Pleistocene lava-dam outburst flood in Grand Canyon, Arizona, USA  

E-Print Network [OSTI]

produced the largest known flood on the Colorado River in Grand Canyon. The Hyaloclastite Dam was up to 366 Canyon; Colorado river; Pleistocene floods; Lava dams; Hydraulic modeling; Paleoflood indicators; DamPeak discharge of a Pleistocene lava-dam outburst flood in Grand Canyon, Arizona, USA Cassandra R

286

Basin evolution, diagenesis and uranium mineralization in the PaleoproterozicThelon Basin,  

E-Print Network [OSTI]

Basin evolution, diagenesis and uranium mineralization in the PaleoproterozicThelon Basin, Nunavut,Canada Eric E. Hiatt,n Sarah E. Palmer,w1 T. Kurt Kyserw and Terrence K. O'Connorz n Geology Department, University of Wisconsin Oshkosh, Oshkosh,Wisconsin, USA wDepartment of Geological Sciences and Engineering

Hiatt, Eric E.

287

Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction,  

Broader source: Energy.gov (indexed) [DOE]

Monitoring of the Airport Calibration Pads at Walker Field, Grand Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) More Documents & Publications Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report

288

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

289

Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001  

Office of Legacy Management (LM)

Grand Junction Disposal Site Grand Junction Disposal Site Uranium ore was processed at the Climax millsite at Grand Junction, Colorado, between 1951 and 1970. The milling operations created process-related waste and tailings, a sandlike material containing radioactive materials and other contaminants. The tailings were an ideal and inexpensive construction material suitable for concrete, mortar, and fill. Accordingly, the tailings were widely used in the Grand Junction area for these purposes. The U.S. Department of Energy (DOE) encapsulated the tailings and other contaminated materials from the millsite and more than 4,000 vicinity properties in the Grand Junction area in an engineered disposal cell. Part of the disposal cell was completed in 1994; the remainder of the cell remains open until it is

290

Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at  

Broader source: Energy.gov (indexed) [DOE]

to Deliver Keynote on EV Everywhere Grand Challenge to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show January 30, 2013 - 1:37pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Tomorrow, Thursday, January 31, 2013, Secretary Chu will deliver the government keynote address at the Washington Auto Show's Public Policy Day. His remarks will focus on the Energy Department's EV Everywhere Grand Challenge, including progress to date and a new initiative to strengthen American leadership in this rapidly growing global industry. Launched by President Obama in March 2012, EV-Everywhere is the second in a series of Energy Department "Clean Energy Grand Challenges" aimed at addressing the most pressing energy challenges of our time. The EV

291

Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) |  

Open Energy Info (EERE)

Rio Grande Rift Region (Aiken & Ander, 1981) Rio Grande Rift Region (Aiken & Ander, 1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) Exploration Activity Details Location Rio Grande Rift Geothermal Region Exploration Technique Ground Gravity Survey Activity Date Usefulness useful DOE-funding Unknown References Carlos L.V. Aiken, Mark E. Ander (1981) A Regional Strategy For Geothermal Exploration With Emphasis On Gravity And Magnetotellurics Retrieved from "http://en.openei.org/w/index.php?title=Ground_Gravity_Survey_At_Rio_Grande_Rift_Region_(Aiken_%26_Ander,_1981)&oldid=401473" Category: Exploration Activities What links here Related changes Special pages Printable version

292

Williston in the family of cratonic basins  

SciTech Connect (OSTI)

The Williston basin is one of a clan of subcircular to elliptical elements in the interiors of all cratons; such basins are distinguished by characteristics common to all. In each, the basement consists of continental crust and each basin is surrounded by areas of continental crust. Subsidence rates are typically low, so that conditions near depositional base level prevailed during much of the history of sediment accumulation. Episodic subsidence occurred over time spans of 10/sup 7/-10/sup 8/ years; major episodes of subsidence are broadly concurrent on all cratons. Tectonic tempo and mode of subsidence evolved synchronously on all cratons; therefore, similar isopach and facies patterns (and similar oil or gas maturation, migration, and trap potentials) occur on all cratons. All members of the clan exhibit a range of individual variations imposed by latitude and climate. Intraplate tectonism and volcanism, approach to or distance from source areas, and distribution paths of detrital sediment. Nevertheless, facts and concepts developed by intensive study of basins with high-density documentation (outcrop and subsurface) are commonly applicable to basins such as the Williston, which is in a less mature stage of exploration.

Sloss, L.L.

1985-05-01T23:59:59.000Z

293

Monitoring and Evaluation of Smolt Migration in the Columbia Basin, Volume XIV; Evaluation of 2006 Prediction of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead at Rock Island, Lower Granite, McNary, John Day and Bonneville Dams using Program Real Time, Technical Report 2006.  

SciTech Connect (OSTI)

Program RealTime provided monitoring and forecasting of the 2006 inseason outmigrations via the internet for 32 PIT-tagged stocks of wild ESU chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville Dams. Twenty-four stocks are of wild yearling chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2006, and have at least one year's historical migration data previous to the 2006 migration. These stocks originate in drainages of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through the tag identification and monitored at Lower Granite Dam. In addition, seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling chinook salmon and the steelhead trout runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead trout forecasted to Rock Island, McNary, John Day, and Bonneville Dams.

Griswold, Jim

2007-01-01T23:59:59.000Z

294

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.  

SciTech Connect (OSTI)

Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

Griswold, Jim; Townsend, Richard L.; Skalski, John R.

2008-12-01T23:59:59.000Z

295

E-Print Network 3.0 - athabasca basin western Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thelon Basin Boomerang Lake Western Thelon Basin Eastern Thelon... to the world-class uranium-producing Athabasca basin. At present, the Thelon basin is only known to host......

296

Origin Basin Destination State STB EIA STB EIA Northern Appalachian Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Florida W $38.51 W $140.84 27.3% 134 W 100.0% Florida W $38.51 W $140.84 27.3% 134 W 100.0% Northern Appalachian Basin Georgia - W - W W W - W Northern Appalachian Basin Indiana W $16.14 W $63.35 25.5% 1,681 W 88.5% Northern Appalachian Basin Maryland $20.69 $19.60 -5.3% $74.23 26.4% 4,845 31.9% 97.7% Northern Appalachian Basin Michigan $13.74 $16.13 17.4% $99.82 16.2% 840 32.1% 100.0% Northern Appalachian Basin New Hampshire W $40.18 W $94.03 42.7% 699 W 100.0% Northern Appalachian Basin New Jersey W $32.44 W $89.13 36.4% 1,064 W 47.6% Northern Appalachian Basin New York $21.87 $18.86 -13.8% $59.40 31.7% 2,373 49.3% 91.9%

297

Origin Basin Destination State STB EIA STB EIA Northern Appalachian Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Delaware W $28.49 W $131.87 21.6% 59 W 100.0% Delaware W $28.49 W $131.87 21.6% 59 W 100.0% Northern Appalachian Basin Florida W - - - - - - - Northern Appalachian Basin Indiana W $20.35 W $64.82 31.4% 1,715 W 75.9% Northern Appalachian Basin Maryland $19.73 $19.64 -0.4% $81.15 24.2% 4,650 24.8% 99.3% Northern Appalachian Basin Michigan W $14.02 W $76.22 18.4% 713 W 100.0% Northern Appalachian Basin New Hampshire W $43.43 W $90.90 47.8% 499 W 89.6% Northern Appalachian Basin New Jersey W $27.19 W $74.81 36.3% 1,864 W 44.1% Northern Appalachian Basin New York $20.08 $15.26 -24.0% $53.68 28.4% 3,726 39.2% 79.1%

298

Sediment Basin Flume | Open Energy Information  

Open Energy Info (EERE)

Sediment Basin Flume Sediment Basin Flume Jump to: navigation, search Basic Specifications Facility Name Sediment Basin Flume Overseeing Organization University of Iowa Hydrodynamic Testing Facility Type Flume Length(m) 22.7 Beam(m) 5.1 Depth(m) 1.2 Cost(per day) Contact POC Special Physical Features Two pumps provide up to 18 cfs of flow capacity Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities None Channel/Tunnel/Flume Channel/Tunnel/Flume Yes Recirculating No Wind Capabilities Wind Capabilities None Control and Data Acquisition Cameras None Available Sensors Acoustics, Flow, Thermal, Turbulence, Velocity Data Generation Capability Real-Time Yes Test Services Test Services Yes On-Site fabrication capability/equipment Machine shop, carpenter shop, welding shop, instrumentation and electronics shop

299

Dan Klempel Basin Electric Power Cooperative DOE  

Broader source: Energy.gov (indexed) [DOE]

Dan Dan Klempel Basin Electric Power Cooperative DOE 2009 Congestion Study Workshop Oklahoma City, Oklahoma June 18, 2008 Page 1 of 5 Basin Electric Power Cooperative would like to thank the Department of Energy for this opportunity to share some of our thoughts on transmission congestion issues. Basin Electric is a wholesale power supplier to rural electric cooperatives located in the mid-west and in both the east and west interconnections. Naturally, our generation and transmission facilities also reside in both interconnections so we use asynchronous back-to-back DC facilities to balance loads with resources. With headquarters in Bismarck, North Dakota; we find ourselves in the heart of some of the nations most desirable wind patterns for potential renewable energy development as well as electric energy production from more traditional sources. Lignite coal has been a reliable

300

Hinsdale Wave Basin 2 | Open Energy Information  

Open Energy Info (EERE)

Wave Basin 2 Wave Basin 2 Jump to: navigation, search Basic Specifications Facility Name Hinsdale Wave Basin 2 Overseeing Organization Oregon State University Hydrodynamics Length(m) 48.8 Beam(m) 26.5 Depth(m) 2.1 Water Type Freshwater Cost(per day) $3500 Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.8 Maximum Wave Height(m) at Wave Period(s) 10.0 Wave Period Range(s) 10.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Monochromatic waves (cnoidal, Stokes, Airy), solitary waves, user-defined free surface timeseries or board displacement timeseries for random waves Wave Direction Both Simulated Beach Yes Description of Beach Built to client specifications, currently rigid concrete over gravel fill

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

SWP.SanJuanBasin.factsheet0919  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Principal Investigator Reid Grigg/Brian McPherson NMT reid@prrc.nmt.edu / brian@nmt.edu Field Test Information: Field Test Name San Juan Basin, New Mexico: Enhanced Coalbed Methane-Sequestration Test Test Location Near Navajo City, New Mexico Amount and Source of CO 2 Tons Source 20,000 - 35,000 tons; CO2 sourced from McElmo Dome, CO ConocoPhillips KinderMorgan CO 2 Company, L.P. Field Test Partners (Primary Sponsors) Summary of Field Test Site and Operations General Geology and Target Reservoirs: The San Juan basin (SJB) is one of the top ranked basins in the world for CO 2 coalbed sequestration because it has: 1) advantageous geology and high methane content; 2) abundant anthropogenic CO

302

Southern Basin and Range Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Basin and Range Geothermal Region Basin and Range Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Southern Basin and Range Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: {{{Name}}} North-south-striking and west-dipping Basin and Range province normal faults form the western edge of the Sierra Madre Occidental plateau in northeastern Sonora. These faults and associated half-grabens extend over a distance of more than 300 km between the San Bernardino basin in the north and the Sahuaripa basin in the south. Active Tectonics of Northeastern Sonora, Mexico (Southern Basin and Range Province) and the 3 May 1887 Mw 7.4 Earthquake [1] References ↑ "Active Tectonics of Northeastern Sonora, Mexico (Southern Basin and Range Province) and the 3 May 1887 Mw 7.4 Earthquake"

303

Sources of Atmospheric Moisture for the La Plata River Basin  

Science Journals Connector (OSTI)

The La Plata River basin (LPRB) is the second largest basin of South America and extends over a highly populated and socioeconomically active region. In this study, the spatiotemporal variability of sources of moisture for the LPRB are quantified ...

J. Alejandro Martinez; Francina Dominguez

2014-09-01T23:59:59.000Z

304

Colorado Division of Water Resources Denver Basin Webpage | Open...  

Open Energy Info (EERE)

Denver Basin Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Division of Water Resources Denver Basin Webpage Abstract This is the...

305

Sheldon Glashow, the Electroweak Theory, and the Grand Unified Theory  

Office of Scientific and Technical Information (OSTI)

Sheldon Glashow and the Electroweak Theory Sheldon Glashow and the Electroweak Theory Resources with Additional Information Sheldon Glashow Courtesy AIP Emilio Segrè Visual Archives, Segrè Collection [Sheldon] 'Glashow shared the 1979 Nobel Prize for physics with Steven Weinberg and Abdus Salam for unifying the theories of weak and electromagnetic forces. The new "electroweak" theory underlies all of particle physics and provides a framework for understanding how the early universe evolved and how the chemical elements were created. ... "Glashow's work has been instrumental in our understanding of how our universe came into being," says Lawrence R. Sulak, chairman of the Boston University physics department. "In the years since winning the prize, Glashow has helped develop the Grand Unified Theory of all particles and all forces. Its predictions led to the construction of massive underground detectors, the refinement of the unification models, the first observation of neutrinos from a supernova, and the recent discovery that neutrinos have mass. Glashow has fueled an ongoing search for rare events and exotic effects that may shed further light on the evolution of the early universe."1

306

Advanced Resin Cleaning System (ARCS) at Grand Gulf Nuclear Station  

SciTech Connect (OSTI)

Steam generation system in-core components can undergo serious material degradation by a variety of corrosion-related phenomena. These phenomena are largely controlled by boiler water (i.e. reactor water) chemistry which is strongly impacted by the performance of the condensate system mixed bed ion exchange units. In Boiling Water Reactors (BWR), the mixed bed ion exchange units not only provide protection from ionic contaminants, but also remove insoluble corrosion products by filtration/adsorption. These insoluble corrosion products removed by the ion exchange units must then be periodically cleaned from the resin bed by some process external to the BWR primary water loop. A unique resin cleaning process called the {open_quotes}Advanced Resin Cleaning System{close_quotes} (ARCS) was developed in the late 1980`s by members of CENTEC-XXI, located in Santa Clara, CA. This system, which has been successfully operated for several years at a Pressurized Water Reactor is highly efficient for removal of both insoluble corrosion products and anion/cation resin fines, and generates significantly less waste water than other cleaning methods. The ARCS was considered the most attractive method for meeting the demanding and costly resin cleaning needs of a BWR. A {open_quotes}Tailored Collaboration{close_quotes} project was initiated between EPRI, Entergy Operations (Grand Gulf Station), and CENTEC-XXI to demonstrate the {open_quotes}Advanced Resin Cleaning System{close_quotes} in a BWR.

Asay, R.H.; Earls, J.E.; Naughton, M.D. [Centec 21, Inc., Santa Clara, CA (United States)

1996-10-01T23:59:59.000Z

307

Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998  

SciTech Connect (OSTI)

The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997.

NONE

1998-04-01T23:59:59.000Z

308

NE Pacific Basin --Tagging Data Kate Myers, Ph.D.  

E-Print Network [OSTI]

Ocean B: NE Pacific Basin --Tagging Data Kate Myers, Ph.D. Principal Investigator, High Seas Salmon ocean tagging research on Columbia River salmon and steelhead migrating in the NE Pacific Basin R. Basin in 1995-2004. Fisheries and Oceans Canada, Pacific Biological Station, Nanaimo, B

309

Lithosphere structure beneath the Phanerozoic intracratonic basins of North America  

E-Print Network [OSTI]

Abstract Four intracratonic basins of North America, the Hudson Bay, Michigan, Illinois and Williston. The Williston and Illinois basins are associated with wide (V200 km) and thin anomalies (V100 km), whereas basin and 270 km beneath the Williston [4,6]. For two ba- sins of similar age located on the same Precam

Kaminski, Edouard

310

BIOSTRATIGRAPHY, WILLISTON BASIN By D.J. Nichols  

E-Print Network [OSTI]

Chapter WB BIOSTRATIGRAPHY, WILLISTON BASIN By D.J. Nichols in U.S. Geological Survey Professional .........................................................................................................WB-3 Figures WB-1. Biostratigraphic reference sections in the Williston Basin. WB-2. Occurrences. Palynostratigraphic zones of the Paleocene in the Williston Basin composite reference section. WB-4. Distribution

311

Area environmental characterization report of the Dalhart and Palo Duro basins in the Texas Panhandle. Volume II. Palo Duro basin  

SciTech Connect (OSTI)

This area report describes the environmental characteristics of the Dalhart and Palo Duro basins of the Texas Panhandle portion of the Permian basin. Both basins are rather sparsely populated, and the overall population is decreasing. The economic base is centered on agribusiness and manufacturing. Most of the potentially conflicting land uses in both basins (i.e., parks, historic sites) occupy small land areas, with the exception of a national grassland in the Dalhart and military air training routes in both basins. Ground transportation in the Dalhart basin is adequate, and it is well developed in the Palo Duro basin. In both basins irrigation constitutes the principal water use, and groundwater is the principal source. However, the dominant aquifer, the Ogallala, is being depleted. Both basins consist primarily of grasslands, rangelands, and agricultural areas. No critical terrestrial or aquatic habitats have been identified in the basins, though several endangered, threatened, or rare terrestrial species occur in or near the basins. Aquatic resources in both basins are limited because of the intermittent availability of water and the high salt content of some water bodies. Playa lakes are common, though usually seasonal or rain dependent. The climate of the area is semiarid, with low humidity, relatively high wind speeds, and high variable precipitation. Restrictive dispersion conditions are infrequent. National ambient secondary air quality standards for particulates are being exceeded in the area, largely because of fugitive dust, although there are some particulate point sources.

Not Available

1982-09-01T23:59:59.000Z

312

Area environmental characterization report of the Dalhart and Palo Duro basins in the Texas Panhandle. Volume I. Dalhart Basin  

SciTech Connect (OSTI)

This area report describes the environmental characteristics of the Dalhart and Palo Duro basins of the Texas Panhandle portion of the Permian basin. Both basins are rather sparsely populated, and the overall population is decreasing. The economic base is centered on agribusiness and manufacturing. Most of the potentially conflicting land uses in both basins (i.e., parks, historic sites) occupy small land areas, with the exception of a national grassland in the Dalhart and military air training routes in both basins. Ground transportation in the Dalhart basin is adequate, and it is well developed in the Palo Duro basin. In both basins irrigation constitutes the principal water use, and groundwater is the principal source. However, the dominant aquifer, the Ogallala, is being depleted. Both basins consist primarily of grasslands, rangelands, and agricultural areas. No critical terrestrial or aquatic habitats have been identified in the basins, though several endangered, threatened, or rare terrestrial species occur in or near the basins. Aquatic resources in both basins are limited because of the intermittent availability of water and the high salt content of some water bodies. Playa lakes are common, though usually seasonal or rain dependent. The climate of the area is semiarid, with low humidity, relatively high wind speeds, and highly variable prcipitation. Restrictive dispersion conditions are infrequent. National ambient secondary air quality standards for particulates are being exceeded in the area, largely because of fugitive dust, although there are some particulate point sources.

Not Available

1982-09-01T23:59:59.000Z

313

Timing and Tectonic implications of basin inversion in the Nam Con Son Basin and adjacent areas, southern South China Sea  

E-Print Network [OSTI]

and Malay basins. Contraction in the Western NCS, West Natuna, and Malay basins was accommodated through reactivation of major basin-bounding fault systems that resulted in asymmetric fault-bend folding of syn- and early post-rift strata. Inversion...

Olson, Christopher Charles

2012-06-07T23:59:59.000Z

314

Tobacco vs. helminths in Congo basin hunter-gatherers Tobacco use vs. helminths in Congo basin hunter-gatherers  

E-Print Network [OSTI]

Tobacco vs. helminths in Congo basin hunter-gatherers 1 Tobacco use vs. helminths in Congo basin hunter-gatherers: Self-medication in humans? Casey J-546-9257 #12;Tobacco vs. helminths in Congo basin hunter-gatherers 2 Summary

315

High performance computing and communications grand challenges program  

SciTech Connect (OSTI)

The so-called protein folding problem has numerous aspects, however it is principally concerned with the {ital de novo} prediction of three-dimensional (3D) structure from the protein primary amino acid sequence, and with the kinetics of the protein folding process. Our current project focuses on the 3D structure prediction problem which has proved to be an elusive goal of molecular biology and biochemistry. The number of local energy minima is exponential in the number of amino acids in the protein. All current methods of 3D structure prediction attempt to alleviate this problem by imposing various constraints that effectively limit the volume of conformational space which must be searched. Our Grand Challenge project consists of two elements: (1) a hierarchical methodology for 3D protein structure prediction; and (2) development of a parallel computing environment, the Protein Folding Workbench, for carrying out a variety of protein structure prediction/modeling computations. During the first three years of this project, we are focusing on the use of two proteins selected from the Brookhaven Protein Data Base (PDB) of known structure to provide validation of our prediction algorithms and their software implementation, both serial and parallel. Both proteins, protein L from {ital peptostreptococcus magnus}, and {ital streptococcal} protein G, are known to bind to IgG, and both have an {alpha} {plus} {beta} sandwich conformation. Although both proteins bind to IgG, they do so at different sites on the immunoglobin and it is of considerable biological interest to understand structurally why this is so. 12 refs., 1 fig.

Solomon, J.E.; Barr, A.; Chandy, K.M.; Goddard, W.A., III; Kesselman, C.

1994-10-01T23:59:59.000Z

316

Grand unified theories and supersymmetry in particle physics and cosmology  

Science Journals Connector (OSTI)

A review is given on the consistency checks of Grand Unified Theories (GUT), which unify the electroweak and strong nuclear forces into a single theory. Such theories predict a new kind of force, which could provide answers to several open questions in cosmology. The possible role of such a “primeval” force will be discussed in the framework of the Big Bang Theory. Although such a force cannot be observed directly, there are several predictions of GUT's, which can be verified at low energies. The Minimal Supersymmetric Standard Model (MSSM) distinguishes itself from other GUT's by a successful prediction of many unrelated phenomena with a minimum number of parameters. Among them: a) Unification of the couplings constants; b) Unification of the masses; c) Existence of dark matter; d) Proton decay; e) Electroweak symmetry breaking at a scale far below the unification scale. A fit of the free parameters in the MSSM to these low energy constraints predicts the masses of the as yet unobserved superpartners of the SM particles, constrains the unknown top mass to a range between 140 and 200 GeV, and requires the second order QCD coupling constant to be between 0.108 and 0.132. “The possibility that the universe was generated from nothing is very interesting and should be further studied. A most perplexing question relating to the singularity is this: what preceded the genesis of the universe? This question appears to be absolutely methaphysical, but our experience with metaphysics tells us that metaphysical questions are sometimes given answers by physics.” A. Linde (1982)

W De Boer

1994-01-01T23:59:59.000Z

317

OTRC Wave Basin | Open Energy Information  

Open Energy Info (EERE)

OTRC Wave Basin OTRC Wave Basin Jump to: navigation, search Basic Specifications Facility Name OTRC Wave Basin Overseeing Organization Texas A&M (OTRC) Hydrodynamic Testing Facility Type Wave Basin Length(m) 45.7 Beam(m) 30.5 Depth(m) 5.8 Water Type Freshwater Cost(per day) $300/hour (excluding labor) Special Physical Features 4.6m wide x 9.1m long x 16.8m deep pit with adjustable depth floor in test area Towing Capabilities Towing Capabilities Yes Maximum Velocity(m/s) 0.6 Length of Effective Tow(m) 27.4 Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.9 Maximum Wave Height(m) at Wave Period(s) 4.0 Maximum Wave Length(m) 25 Wave Period Range(s) 4.0 Current Velocity Range(m/s) 0.6 Programmable Wavemaking Yes Wavemaking Description GEDAP 3D wave generation software, 48 hinged flap wave generator

318

Upper San Juan Basin Biological Assessment  

E-Print Network [OSTI]

the biological assessment. The Colorado Natural Heritage Program began its research by updating its BiologicalUpper San Juan Basin Biological Assessment Colorado State University 8002 Campus Delivery Fort Collins, CO 80523-8002 June 2003 Colorado Natural Heritage Program #12;Southwest Land Alliance Pagosa

319

The State of the Columbia River Basin  

E-Print Network [OSTI]

: The State of the Columbia River Basin in 2012 07 Northwest Energy Efficiency Achievements, 1978-2011 10 Council undertakes mid-term review of Sixth Power Plan 11 Energy Efficiency met most of the new and Commerce United states House of representatives and Committee on Natural resources United states House

320

The State of the Columbia River Basin  

E-Print Network [OSTI]

, and Washington. The Act authorized the Council to serve as a comprehensive planning agency for energy policy and fish and wildlife policy in the Columbia River Basin and to inform the public about energy and fish Overview 11 Sixth Northwest Power Plan boosts energy efficiency, renewable energy, Energy efficiency

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

GUNNISON BASIN CLIMATE CHANGE VULNERABILITY ASSESSMENT  

E-Print Network [OSTI]

Climate change is already changing ecosystems and affecting people in the southwestern United States, as well as ecosystem services, e.g., water supply. The climate of the Gunnison Basin, Colorado Fish and Wildlife Service, US Forest Service, Upper Gunnison River Water Conservancy District, Western

Neff, Jason

322

Summary - K Basins Sludge Treatment Process  

Broader source: Energy.gov (indexed) [DOE]

K Basin K Basin DOE is Proces the va at Han subsys oxidati objecti of-fact maturi Eleme Techn The as which seven * M * M * Pr * Pr * As The Ele Site: H roject: K P Report Date: A ited States Why DOE ns Sludge Treatme s constructing ss (STP) for re rious sludge st nford. The STP stems: sludge ion, assay, pac ive of the asse t" appraisal of t ty by first ident ents (CTEs) of t ology Readine What th ssessment team was further div CTEs and the Material Mobiliza Material Transfe rocess Chemis rocess Instrum ssay (TRL=2) To view the full T http://www.em.doe. objective of a Tech ements (CTEs), usin Hanford/ORP K Basins Slud Process/STP August 2007 Departmen K Bas E-EM Did This ent Process Flow D a K Basins Slu trieving, treatin treams stored i P is comprised containerizatio ckaging, and dr ssment was to the project's ov

323

Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Grande Lodge Pool & Spa Low Temperature Geothermal Facility Grande Lodge Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility Facility Sierra Grande Lodge Sector Geothermal energy Type Pool and Spa Location Truth or Consequences, New Mexico Coordinates 33.1284047°, -107.2528069° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

324

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan  

Broader source: Energy.gov (indexed) [DOE]

355: Remediation of the Moab Uranium Mill Tailings, Grand and 355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Summary The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water

325

Microsoft Word - CX-GrandCoulee-Bell3WestsideInsulatorRepAccessImprov_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Mark Kjelland Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line insulator replacement and access improvement project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit

326

A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand  

Open Energy Info (EERE)

Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Details Activities (4) Areas (1) Regions (0) Abstract: Erosion in the Grand Canyon of the Yellowstone River, Yellowstone Caldera (640 ka), Wyoming, has exposed a cross section of older hydrothermal alteration in the canyon walls. The altered outcrops of the post-collapse tuff of Sulphur Creek (480 ka) extend from the canyon rim to more than 300 m beneath it. The hydrothermal minerals are zoned, with an advanced argillic alteration consisting of an association of quartz (opal)

327

SunShot Shoots for the Moon with First Grand Challenge Event | Department  

Broader source: Energy.gov (indexed) [DOE]

SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event May 23, 2012 - 11:40am Addthis The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. Ramamoorthy Ramesh Former Director, SunShot Initiative & Solar Energy Technologies Program How can I participate? The SunShot Initiative Grand Challenge: Summit and Technology Forum , taking place June 13 -14 in Denver, will focus on the progress made and challenges ahead for driving down the cost of solar technologies.

328

Secondary seed dispersal in Montrichardia arborescens (L.) schott dominated wetlands in Laguna Grande, Venezuela  

Science Journals Connector (OSTI)

Laguna Grande, Monagas State, Venezuela, is a shallow, V-shaped lake created by the confluence of two rivers. Montrichardia arborescens (L.) Schott. dominated wetlands cover most of the north and south arms and t...

Elizabeth Gordon; Arnold G. van der Valk

2003-09-01T23:59:59.000Z

329

Anti-Grand Unification and the Phase Transitions at the Planck Scale in Gauge Theories  

Science Journals Connector (OSTI)

The way of the Grand unification of all interactions and the role of supersym-metry in GUTs are the problems of paramount importance in the contemporary elementary particle physics. However, at present time ex...

L. V. Laperashvili

2001-01-01T23:59:59.000Z

330

Flow, Salts, and Trace Elements in the Rio Grande: A Review  

E-Print Network [OSTI]

must then focus on either in- creasing salt removal, minimizing salt inflow into the Rio Grande, or reducing evaporative losses of water, which concentrate salts. Although techniques to remove salts such as reverse os- mosis and electrodialysis exist...

Miyamoto, S.; Fenn, L. B.; Swietlik, D.

1995-01-01T23:59:59.000Z

331

Influences of vegetation characteristics and invertebrate abundance of Rio Grande wild turkey populations, Edwards Plateau, Texas  

E-Print Network [OSTI]

Since 1970, Rio Grande wild turkey (Meleagris gallapavo intermedia) numbers in the southern region of the Edwards Plateau of Texas have been declining. Nest-site characteristics and invertebrate abundance were hypothesized as limiting wild turkey...

Randel, Charles Jack

2005-02-17T23:59:59.000Z

332

Reproductive ecology of Rio Grande wild turkey in the Edwards Plateau of Texas  

E-Print Network [OSTI]

The abundance of Rio Grande wild turkeys (Meleagris gallopavo intermedia) in the southeastern Edwards Plateau of Texas has declined since the late 1970s. Because knowledge of reproductive rates is important to understanding the dynamics of a...

Melton, Kyle Brady

2009-05-15T23:59:59.000Z

333

Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA  

Broader source: Energy.gov [DOE]

The SunShot Initiative at the U.S. Department of Energy (DOE) will host the second 2014 SunShot Grand Challenge Summit and Peer Review from May 19-22 in Anaheim, California.

334

Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit  

Broader source: Energy.gov [DOE]

This week in sunny Anaheim, California, more than 800 solar industry leaders gathered for the 2014 SunShot Grand Challenge Summit. The Summit, launched by the Energy Department’s SunShot Initiative...

335

Vegetation, soils, and surface hydrology of playa landforms in the Rio Grande Plains, Texas  

E-Print Network [OSTI]

Playas in the Rio Grande Plains of southern Texas were compared with respect to their: 1) size, shape, soil properties, and microtopography, 2) vegetation composition and structure, 3) surface water accumulation potential, and 4) disturbance history...

Farley, Andrea Lee

2012-06-07T23:59:59.000Z

336

Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review  

Broader source: Energy.gov [DOE]

Members of the media are invited to attend the U.S. Department of Energy (DOE) SunShot Initiative’s 2014 Grand Challenge Summit and Peer Review in Anaheim, California from May 19-22, 2014.

337

Nesting ecology of Rio Grande wild turkeys in the Edwards Plateau of Texas  

E-Print Network [OSTI]

. Since 2001, research has been conducted in the southeastern EP evaluating factors which could be responsible for the decline of Rio Grande turkeys in this region of Texas. I used digital cameras to evaluate the effect of nest predation...

Dreibelbis, Justin Zachary

2009-05-15T23:59:59.000Z

338

An applied paleoecology case study: Bahia Grande, Texas prior to construction of the Brownsville Ship Channel  

E-Print Network [OSTI]

out a comprehensive survey of the entire Texas coastline in the 1970s and 1980s including an examination of sedimentology, geochemistry, bathymetry, and both live and dead benthic invertebrates (White et al. 1983, 1986, 1989). Although Bahia Grande...

Lichlyter, Stephen Alvah

2006-08-16T23:59:59.000Z

339

K Basin sludge dissolution engineering study  

SciTech Connect (OSTI)

The purpose of this engineering study is to investigate the available technology related to dissolution of the K Basin sludge in nitric acid. The conclusion of this study along with laboratory and hot cell tests with actual sludge samples will provide the basis for beginning conceptual design of the sludge dissolver. The K Basin sludge contains uranium oxides, fragments of metallic U, and some U hydride as well as ferric oxyhydroxide, aluminum oxides and hydroxides, windblown sand that infiltrated the basin enclosure, ion exchange resin, and miscellaneous materials. The decision has been made to dispose of this sludge separate from the fuel elements stored in the basins. The sludge will be conditioned so that it meets Tank Waste Remediation System waste acceptance criteria and can be sent to one of the underground storage tanks. Sludge conditioning will be done by dissolving the fuel constituents in nitric acid, separating the insoluble material, adding neutron absorbers for criticality safety, and then reacting the solution with caustic to co-precipitate the uranium and plutonium. There will be five distinct feed streams to the sludge conditioning process two from the K East (KE) Basin and three from the K West (KW) Basin. The composition of the floor and pit sludges which contain more iron oxides and sand than uranium is much different than the canister sludges which are composed of mostly uranium oxides. The sludge conditioning equipment will be designed to process all of the sludge streams, but some of the operating parameters will be adjusted as necessary to handle the different sludge stream compositions. The volume of chemical additions and the amount of undissolved solids will be much different for floor and pit sludge than for canister sludge. Dissolution of uranium metal and uranium dioxide has been studied quite thoroughly and much information is available. Both uranium metal and uranium dioxide have been dissolved on a large scale in nuclear fuel reprocessing plants in Europe, Japan, and the USA. Ash and sludge containing uranium compounds also have been dissolved in reprocessing or plutonium scrap recovery plants, but only a limited amount of information is available on how the ferric oxyhydroxide, aluminum compounds and silicates in the sand will behave during nitric acid dissolution. Laboratory work with simulants and hot cell work with actual K Basin sludge is in progress to obtain data in these areas.

Westra, A.G.

1998-08-28T23:59:59.000Z

340

Gravity-driven structures and rift basin evolution: Rio Muni Basin, offshore equatorial West Africa  

SciTech Connect (OSTI)

Offshore Equatorial Guinea, west Africa, gravity-driven nappes, more than 1 km thick and 15 km from head to toe, provide key evidence in reconstructing the late synrift: evolution of this part of the South Atlantic margin basin system. Furthermore, Aptian-Cenomanian carbonate and clastic rocks in the nappes` allochthonous hanging walls are attracting interest as a new exploration play in west Africa. The nappes exhibit a range of geometries that suggest they share many of the same deformation processes as thin-skin thrust and linked extensional fault systems. Not only are these structures significant in their own right, representing a rare example of gravity tectonics in the virtual absence of major halokinesis, but their presence may record an other-wise undetectable process active during the transition from a rift basin to a passive continental margin. A review of Equatorial Guinea in its pre-Atlantic configuration, alongside neighboring basins in Brazil (the Sergipe-Alagoas basin) and Gabon, suggests that gravity gliding was sustained by a relatively steep, westward paleoslope promoted by east-ward offset of the locus of thermal uplift from the rift basin (i.e., a simple shear model of basin formation). In contrast to gravity-driven structures in most postrift settings, the Equatorial Guinea nappes developed at the close of the Aptian-Albian synrift episode in response to a growing bathymetric deep caused by rapid subsidence outpacing restricted sedimentation.

Turner, J.P. [Univ. of Birmingham (United Kingdom)

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

DOE/Grand Junction Office Bluewater LTSP July 1997 Doc. No. S00012AA, Page iii  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE/Grand Junction Office Bluewater LTSP DOE/Grand Junction Office Bluewater LTSP July 1997 Doc. No. S00012AA, Page iii Contents Page 1.0 Introduction .........................................................................................................................................1 1.1 Purpose ................................................................................................................................1 1.2 Legal and Regulatory Requirements .................................................................................. 1 1.3 Role of the Department of Energy ..................................................................................... 2 1.4 Disposal of Mill Waste Containing Polychlorinated Biphenyls ........................................ 2 2.0 Bluewater Disposal Site .....................................................................................................................

342

Industrial Heat Pumps: Appropriate Placement and Sizing Using the Grand Composite  

E-Print Network [OSTI]

INDUSTRIAL HEAT PUMPS: APPROPRIATE PLACEMENT AND SIZING USING THE GRAND COMPOSITE Saidas M.-Ranade. Eric Hindmarsh and David Boland TENSA Services, Houston, TX ABSTRACT Correct thermodynamic placement ofheat~umps is a necessary condition... characteristics of the total process may result in inefficient designs and is detrimental to the "image" of industrial heat pumps. In this paper the heat pump placement is dis cussed in the context of the total process. The process grand composite curve...

Ranade, S. M.; Hindmarsh, E.; Boland, D.

343

Some grazing system impacts on white-tailed deer on the northern Rio Grande Plain  

E-Print Network [OSTI]

SOME GRAZING SYSTEM IMPACTS ON WHITE-TAILED DEER ON THE NORTHERN RIO GRANDE PLAIN A Thesis by HUGH DOUGLAS PATRICKSON Submitted to the Graduate College of Texas ASM University in partial fulfillment of the requirement for the degree... of MASTER OF SCIENCE May 1983 Major Subject: Wildlife and Fisheries Sciences SOME GRAZING SYSTEM IMPACTS ON WHITE-TAILED DEER ON THE NORTHERN RIO GRANDE PLAIN A Thesis by HUGH DOUGLAS PATRICKSON Approved as to style and content by: (Chairman...

Patrickson, Hugh Douglas

2012-06-07T23:59:59.000Z

344

Delaware River Basin Commission (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

345

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

346

Seismic stratigraphy and structure of the Progreso Basin, Ecuador  

E-Print Network [OSTI]

. Watkins Examination of seismic, well log and magnetic data across the Progreso Basin shows that more than 5. 5 km of sediment has been deposited in the basin with a thick sedimentary wedge io the east. The basin, bounded by two prominent normal faults... and the La Cruz fault a small sub-basin l, as been formed with considerable deposition onlv during the iast period of basin developnient. Facies, structurah isochron and velocity maps were produced for each of the five units identified on the seismic...

Goyes Arroyo, Patricio

2012-06-07T23:59:59.000Z

347

Interstate Commission on the Potomac River Basin (Multiple States) |  

Broader source: Energy.gov (indexed) [DOE]

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

348

EIS-0340: Oregon Hatchery Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

340: Oregon Hatchery Project 340: Oregon Hatchery Project EIS-0340: Oregon Hatchery Project Summary This EIS analyzes the environmental impacts of developing additional facilities and modifications to existing facilities built for the Lower Snake River Compensation Plan in order to mitigate impacts to natural populations of spring chinook salmon in the Grande Ronde and Imnaha River basins caused by DOE's Bonneville Power Administration's operation of four federal dams on the lower Snake River. The U.S. Fish and Wildlife Service, U.S. Department of the Interior, and the U.S. Forest Service, Department of Agriculture, are cooperating agencies. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download March 23, 2006 EIS-0340-SA-01: Supplement Analysis

349

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 30720 of 31,917 results. 11 - 30720 of 31,917 results. Download Inspection Report: IG-0592 Actions Taken in Response to Missing Hazardous Waste Containing Cyanide http://energy.gov/ig/downloads/inspection-report-ig-0592 Download EA-1308: Finding of No Significant Impact Offsite Transportation of Certain Low-level and Mixed Radioactive Waste from the Savannah River Site for Treatment and Disposal at Commercial and Government Facilities, Aiken, South Carolina http://energy.gov/nepa/downloads/ea-1308-finding-no-significant-impact Download EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project http://energy.gov/nepa/downloads/ea-1636-mitigation-action-plan Download EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program

350

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 17770 of 26,764 results. 61 - 17770 of 26,764 results. Page Support for ENERGY STAR Enforcement By offering a means for consumers to buy products more energy-efficient than required by law, ENERGY STAR has huge potential to save money for consumers by offering buyers more options in energy... http://energy.gov/gc/support-energy-star-enforcement Page EIS-0340: Oregon Hatchery Project This EIS analyzes the environmental impacts of developing additional facilities and modifications to existing facilities built for the Lower Snake River Compensation Plan in order to mitigate impacts to natural populations of spring chinook salmon in the Grande Ronde and Imnaha River basins caused by DOE's Bonneville Power Administration's operation of four federal dams on the lower Snake River. The U.S. Fish and Wildlife

351

I F E B R U A R  

Broader source: Energy.gov (indexed) [DOE]

F F E B R U A R Y 1 9 9 8 GRANDE RONDE BASIN ENDEMIC SPRING CHINOOK SA L M 0 N S-U P P L E M E N TAT I O N P R 0 G RA M Preliminary Environmental Assessment Dol$%- 3018 DOE/EA-1173 DISCLAIMER T h i s report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its usc would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac- turer, or otherwise does not necessarily constitute or imply its endorsement, m

352

Hydrocarbon potential of basins along Australia's southern margin  

SciTech Connect (OSTI)

Seven discrete sedimentary basins are recognized along the southern margin of the Australian continent; namely, from east to west, the Gippsland, Bass, Sorell, Otway, Duntroon, Bight, and Bremer. All formed since the Late Jurassic in response to the separation of Australia and Antarctica, and to the opening of the Tasman Sea. Only the Gippsland basin, which has proved initial oil reserves exceeding 3.6 billion barrels, is a prolific oil province. The search for oil in the other basins has been virtually fruitless despite many similarities between these basins and the Gippsland in terms of stratigraphy and structural geology. Rift and drift components are discernible in the sedimentary successions of all basins but the precise tectonic controls on respective basin formation remain conjectural. The lack of drilling success in the Bremer, Bight, Duntroon, Otway, and Sorell basins has been attributed mainly to the paucity of mature, oil-prone source rocks. The common occurrence of stranded bitumens along the entire coastline, however, indicates oil generation. The Bass and Gippsland basins are both characterized by excellent oil-prone source rocks developed in Late Cretaceous to Early Tertiary sediments. Limited exploration success in the Bass basin is due to poorer reservoir development. The Gippsland basin is at a mature stage of exploration whereas the other basins are moderately to very sparsely explored. Consequently, there is a comparable potential for undiscovered hydrocarbons in all basins. Success in the under-explored basins will come only to those prepared to challenge the perception of low prospectivity. Many play types remain to be tested by the drill.

Willink, R.J. (SAGASCO Resources Limited, Adelaide (Australia))

1991-03-01T23:59:59.000Z

353

Why Sequencea Near-Shore Anoxic Basin?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a Near-Shore Anoxic Basin? a Near-Shore Anoxic Basin? Oxygen minimum zones (OMZs; areas of low dissolved oxygen concentrations) play a major role in biogeochemical cycling within the world's oceans. They are major sinks for nitrogen and sources for the gases carbon dioxide and nitrous oxide. Microbially mediated biological activity associated with these systems affects the productivity of the deep blue sea and the balance of greenhouse gases in the atmosphere. Thus, studies aimed at evaluating the phylogenetic variation and metabolic capacity of microbial communities within these systems have great promise to enhance our understanding of the patterns and processes that drive global biogeochemical phenomena in both aquatic and atmospheric compartments of the biosphere. To this end, JGI and

354

Mississippian Lodgepole Play, Williston Basin: A review  

SciTech Connect (OSTI)

Waulsortian-type carbonate mud mounds in the lower Mississippian Lodgepole formation (Bottineau interval, Madison Group) comprise an important new oil play in the Williston basin with strong regional potential. The play is typified by wells capable of producing 1000-2500 bbl of oil per day and by reserves that have as much as 0.5-3.0 million bbl of oil per well. Currently centered in Stark County, North Dakota, along the southern flank of the basin, the play includes 38 wells, with 21 producers and 6 new fields. Initial discovery was made at a Silurian test in Dickinson field, traditionally productive from Pennsylvanian sands. The largest pool discovered to date is Eland field, which has 15 producers and estimated total reserves of 12-15 million bbl. This report summarizes geologic, well-log, seismic, and production data for this play, which promises to expand considerably in the years to come.

Montgomery, S.L. [Petroleum Consultant, Seattle, WA (United States)

1996-06-01T23:59:59.000Z

355

Hydrothermal circulation in an anisotropic sedimentary basin: Application to the Okinawa back arc basin  

SciTech Connect (OSTI)

The authors explore the pattern of two-dimensional convection in an highly anisotropical porous medium. This physical situation is relevant to passive margin sedimentary basins consisting of interbedded coarse-grained pervious and shale matrix. They show that permeability anisotropies of the order of 10{sup 2}-10{sup 4} allow for long convective cells, of aspect ratio greater than 10, but that a combination of this parameter with a slight slope of the order of a few percent of the sedimentary layers is required to stabilize these long cells. As an example, they present the Okinawa basin, an active submarine back arc basin, with a sedimentary thickness of about 2 km and a heat flow profile across this basin, varying from 32 to 232 mWm{sup {minus}2} over a distance of 30 km. It is shown that this heat flow variation is difficult to explain with conductive mechanisms only but is well reproduced by different convective models relying on permeability anisotropy plus slope. Although the insufficient thermal and structural constraints did not allow them to build a unique model, the whole set of possible fits to the heat flow data may restrict the mean hydraulic parameters of the basin. A vertical permeability of a few tens of milidarcy and an anisotropy greater than 100 are required to produce the expected stable and active large-scale circulation. It is suggested in conclusion that this type of circulation might be active in oil- or oil-forming element migration.

Genthon, P.; Rabinowicz, M. (Groupe de Recherches de Geodesie, Spatiale (France)); Foucher, J.P.; Sibuet, J.C. (Inst. Francais de Recherches pour l'Exploitation de la Mer, Plouzane (France))

1990-11-10T23:59:59.000Z

356

K Basin sludge treatment process description  

SciTech Connect (OSTI)

The K East (KE) and K West (KW) fuel storage basins at the 100 K Area of the Hanford Site contain sludge on the floor, in pits, and inside fuel storage canisters. The major sources of the sludge are corrosion of the fuel elements and steel structures in the basin, sand intrusion from outside the buildings, and degradation of the structural concrete that forms the basins. The decision has been made to dispose of this sludge separate from the fuel elements stored in the basins. The sludge will be treated so that it meets Tank Waste Remediation System (TWRS) acceptance criteria and can be sent to one of the double-shell waste tanks. The US Department of Energy, Richland Operations Office accepted a recommendation by Fluor Daniel Hanford, Inc., to chemically treat the sludge. Sludge treatment will be done by dissolving the fuel constituents in nitric acid, separating the insoluble material, adding neutron absorbers for criticality safety, and reacting the solution with caustic to co-precipitate the uranium and plutonium. A truck will transport the resulting slurry to an underground storage tank (most likely tank 241-AW-105). The undissolved solids will be treated to reduce the transuranic (TRU) and content, stabilized in grout, and transferred to the Environmental Restoration Disposal Facility (ERDF) for disposal. This document describes a process for dissolving the sludge to produce waste streams that meet the TWRS acceptance criteria for disposal to an underground waste tank and the ERDF acceptance criteria for disposal of solid waste. The process described is based on a series of engineering studies and laboratory tests outlined in the testing strategy document (Flament 1998).

Westra, A.G.

1998-08-28T23:59:59.000Z

357

Geological Modeling of Dahomey and Liberian Basins  

E-Print Network [OSTI]

eastern Ivory Coast, off Benin and western Nigeria, and off the Brazilian conjugates of these areas), while large areas were subjected to transform rifting (northern Sierra Leone, southern Liberia, Ghana and the Brazilian conjugates of these areas...). The future Demerara-Guinea marginal plateaus were also progressively subjected to this new rifting event. Stage 2: In Aptian times, the progress of rifting resulted in the creation of small divergent Basins (off northern Liberia, eastern Ivory Coast, Benin...

Gbadamosi, Hakeem B.

2010-01-16T23:59:59.000Z

358

Heat Flow in the Hungarian Basin  

Science Journals Connector (OSTI)

... the basin is deep and the gradient is between 40 and 45 C/km. This geothermal low may be characterized by 1-4-1-6 [jical/cm2 sec except if ... is about 1*5 sec can bo considered as the Western boundary of the Hungarian geothermal anomaly, since heat flow diminishes from that line in the north-west direction to ...

T. BOLDIZSÁR

1964-06-27T23:59:59.000Z

359

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

360

Targeting Of Potential Geothermal Resources In The Great Basin From  

Open Energy Info (EERE)

Targeting Of Potential Geothermal Resources In The Great Basin From Targeting Of Potential Geothermal Resources In The Great Basin From Regional To Basin-Scale Relationship Between Geodetic Strain And Geological Structures Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Targeting Of Potential Geothermal Resources In The Great Basin From Regional To Basin-Scale Relationship Between Geodetic Strain And Geological Structures Details Activities (9) Areas (3) Regions (0) Abstract: We apply a new method to target potential geothermal resources on the regional scale in the Great Basin by seeking relationships between geologic structures and GPS-geodetic observations of regional tectonic strain. First, we establish a theoretical basis for underst~dingh ow the rate of fracture opening can be related to the directional trend of faults

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Northwest Basin and Range Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Northwest Basin and Range Geothermal Region Northwest Basin and Range Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Northwest Basin and Range Geothermal Region Details Areas (48) Power Plants (8) Projects (15) Techniques (33) The Basin and Range Province in northwestern Nevada and northeastern California is characterized by late Cretaceous - early Cenozoic regional erosion, Oligocene - Miocene volcanism, and subsequent late Miocene extension. Extensional faulting in northwestern Nevada began everywhere at 12 Ma and has continued up to the present. Faulting in the Warner Range in northeastern California can only be constrained to have begun between 14 and 3 Ma, but may represent westward migration of Basin and Range extension during the Pliocene. Compared to the many parts of the Basin and Range in

362

Geochemical characterization of geothermal systems in the Great Basin:  

Open Energy Info (EERE)

characterization of geothermal systems in the Great Basin: characterization of geothermal systems in the Great Basin: Implications for exploration, exploitation, and environmental issues Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Geochemical characterization of geothermal systems in the Great Basin: Implications for exploration, exploitation, and environmental issues Details Activities (0) Areas (0) Regions (0) Abstract: The objective of this ongoing project is the development of a representative geochemical database for a comprehensive range of elemental and isotopic parameters (i.e., beyond the typical data suite) for a range of geothermal systems in the Great Basin. Development of this database is one of the first steps in understanding the nature of geothermal systems in the Great Basin. Of particular importance in the Great Basin is utilizing

363

CRAD, Emergency Management - Office of River Protection K Basin Sludge  

Broader source: Energy.gov (indexed) [DOE]

Office of River Protection K Basin Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Emergency Management program at the Office of River Protection K Basin Sludge Waste System. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System More Documents & Publications CRAD, Engineering - Office of River Protection K Basin Sludge Waste System

364

NATURAL GAS RESOURCES IN DEEP SEDIMENTARY BASINS  

SciTech Connect (OSTI)

From a geological perspective, deep natural gas resources are generally defined as resources occurring in reservoirs at or below 15,000 feet, whereas ultra-deep gas occurs below 25,000 feet. From an operational point of view, ''deep'' is often thought of in a relative sense based on the geologic and engineering knowledge of gas (and oil) resources in a particular area. Deep gas can be found in either conventionally-trapped or unconventional basin-center accumulations that are essentially large single fields having spatial dimensions often exceeding those of conventional fields. Exploration for deep conventional and unconventional basin-center natural gas resources deserves special attention because these resources are widespread and occur in diverse geologic environments. In 1995, the U.S. Geological Survey estimated that 939 TCF of technically recoverable natural gas remained to be discovered or was part of reserve appreciation from known fields in the onshore areas and State waters of the United. Of this USGS resource, nearly 114 trillion cubic feet (Tcf) of technically-recoverable gas remains to be discovered from deep sedimentary basins. Worldwide estimates of deep gas are also high. The U.S. Geological Survey World Petroleum Assessment 2000 Project recently estimated a world mean undiscovered conventional gas resource outside the U.S. of 844 Tcf below 4.5 km (about 15,000 feet). Less is known about the origins of deep gas than about the origins of gas at shallower depths because fewer wells have been drilled into the deeper portions of many basins. Some of the many factors contributing to the origin of deep gas include the thermal stability of methane, the role of water and non-hydrocarbon gases in natural gas generation, porosity loss with increasing thermal maturity, the kinetics of deep gas generation, thermal cracking of oil to gas, and source rock potential based on thermal maturity and kerogen type. Recent experimental simulations using laboratory pyrolysis methods have provided much information on the origins of deep gas. Technologic problems are one of the greatest challenges to deep drilling. Problems associated with overcoming hostile drilling environments (e.g. high temperatures and pressures, and acid gases such as CO{sub 2} and H{sub 2}S) for successful well completion, present the greatest obstacles to drilling, evaluating, and developing deep gas fields. Even though the overall success ratio for deep wells is about 50 percent, a lack of geological and geophysical information such as reservoir quality, trap development, and gas composition continues to be a major barrier to deep gas exploration. Results of recent finding-cost studies by depth interval for the onshore U.S. indicate that, on average, deep wells cost nearly 10 times more to drill than shallow wells, but well costs and gas recoveries vary widely among different gas plays in different basins. Based on an analysis of natural gas assessments, many topical areas hold significant promise for future exploration and development. One such area involves re-evaluating and assessing hypothetical unconventional basin-center gas plays. Poorly-understood basin-center gas plays could contain significant deep undiscovered technically-recoverable gas resources.

Thaddeus S. Dyman; Troy Cook; Robert A. Crovelli; Allison A. Henry; Timothy C. Hester; Ronald C. Johnson; Michael D. Lewan; Vito F. Nuccio; James W. Schmoker; Dennis B. Riggin; Christopher J. Schenk

2002-02-05T23:59:59.000Z

365

River Basins Advisory Commissions (South Carolina) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Environmental Regulations Provider Catawba Wateree River Basin Advisory Commission

366

Gravity modeling of Cenozoic extensional basins, offshore Vietnam  

E-Print Network [OSTI]

. . . 78 . . . 81 LIST OF FIGURES Figure 1 Southeast Asian study area location map 2 Major tectonic features of Southeast Asia 3 Mekong basin sediment isopach map . 4 Mekong basin generalized stratigraphy . Page . . . . 1 0 5 Mekong basin... gravity model 2 17 Mekong 2D forward gravity model 3 18 Mekong 2D forward gravity model 4 19 Mekong 2D forward gravity model 5 32 34 . . . 35 . . . 36 Page 20 Schematic 3D forward gravity model of Yinggehai basin sediment . . . 21 3D forward...

Mauri, Steven Joseph

2012-06-07T23:59:59.000Z

367

Contemporary Tectonic Deformation of the Basin and Range Province...  

Open Energy Info (EERE)

Journal Article: Contemporary Tectonic Deformation of the Basin and Range Province, Western United States: 10 Years of Observation with the Global Positioning System Abstract...

368

Coalbed methane production potential in U. S. basins  

SciTech Connect (OSTI)

The major emphasis of the U.S. DOE's coalbed methane research has been on estimating the magnitude of the resource and developing systems for recovery. Methane resource estimates for 16 basins show that the greatest potential is in the Piceance, Northern Appalachian, Central Appalachian, Powder River, and Greater Green River coal basins. Small, high-potential target areas have been selected for in-depth analysis of the resource. Industry interest is greatest in the Warrior, San Juan, Piceance, Raton Mesa, and Northern and Central Appalachian basins. Production curves for several coalbed methane wells in these basins are included.

Byer, C.W.; Mroz, T.H.; Covatch, G.L.

1987-07-01T23:59:59.000Z

369

Oregon Willamette River Basin Mitigation Agreement | Open Energy...  

Open Energy Info (EERE)

Willamette River Basin Mitigation Agreement Author State of Oregon Recipient Bonneville Power Administration Published Publisher Not Provided, 10222010 DOI Not Provided Check for...

370

Minturn Formation of Eagle basin: an exploration frontier  

SciTech Connect (OSTI)

The Eagle basin, a predominantly Desmoinesian evaporite basin in northwestern Colorado, contains many targets for oil and gas reserves. Facies patterns of the Minturn Formation of the Eagle basin are strikingly similar to those of the prolific Paradox Formation of the Paradox basin. Both basins and formations also contain lens-shaped carbonate algal-bioherms. These algal-bioherms are particularly attractive reservoirs where they flank halite-basin margins, the areas of optimum dolomitization. The Minturn formation has been subdivided into individual rock packages using subsurface control. Facies maps constructed for individual units indicate the Eagle basin is a series of smaller basins, each having served as a center for halite deposition. Data support a deep-water model for the deposition of halite; however, a sabkhalike environment existed between the halite basins and the normal marine facies. Halite depocenters appear to have been structurally controlled. The Minturn Formation is very thick and may contain multiple prospective zones at any one location. Within the past year, two and possibly three Minturn discoveries have been made in northwestern Colorado.

Dodge, C.J.N.; Bartleson, B.

1986-08-01T23:59:59.000Z

371

COAL QUALITY AND GEOCHEMISTRY, POWDER RIVER BASIN, WYOMING AND MONTANA  

E-Print Network [OSTI]

in the Powder River Basin in Wyoming and Montana (fig. PQ-1) is considered to be "clean coal." For the location

372

Geographic Information System At Northern Basin & Range Region...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Northern Basin & Range Region (Coolbaugh, Et Al., 2005 - 2) Exploration...

373

Geology of the Douala basin, offshore Cameroon, West Africa  

SciTech Connect (OSTI)

The Douala basin is predominantly an offshore basin extending from the Cameroon volcanic line in the north to the Corisco arch in the south near the Equatorial Guinea-Gabon border. The basin lies wholly within the territorial borders of Cameroon and Equatorial Guinea. The Douala basin is one of a series of divergent margin basins occurring along the southwest African coastline resulting from the rifting of Africa from South America. Continental rifting in the Doula basin was initiated at least by Aptian-Albian time and possibly as early as Jurassic. The rift stage persisted until Albian time when the onset of drifting occurred. The sedimentary section in the basin has a maximum thickness of 8-10 km, based on exploration drilling and gravity and magnetics modeling. The synrift section consists of Aptian-Albian sands and shales, deposited primarily as submarine fans, fan-deltas, and turbidite deposits. These are overlain by salt, thought to be equivalent to the Ezagna salt of Aptian age in the Gabon basin to the south. The synrift section is separated from the overlying postrift shale sequence of Late Cretaceous and Tertiary age by a major late Albian unconformity. The Douala basin has been explored for hydrocarbons intermittently over the last 25 years. Results show a distinct tendency for gas-proneness. The largest field recorded to date is the Sanaga Sud gas field, discovered in 1979, offshore, near the coastal city of Kribi.

Pauken, R.J.; Thompson, J.M.; Schumann, J.R. (Mobil New Exploration Ventures Co., Dallas, TX (United States)); Cooke, J.C. (Mobil Exploration and Production Services Inc., Dallas, TX (United States))

1991-03-01T23:59:59.000Z

374

Field Mapping At Northern Basin & Range Region (Blewitt Et Al...  

Open Energy Info (EERE)

Blewitt Et Al, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Northern Basin & Range Region (Blewitt Et Al, 2005)...

375

California - Los Angeles Basin Onshore Crude Oil + Lease Condensate...  

U.S. Energy Information Administration (EIA) Indexed Site

Production from Reserves (Million Barrels) California - Los Angeles Basin Onshore Crude Oil + Lease Condensate Estimated Production from Reserves (Million Barrels) Decade Year-0...

376

California - San Joaquin Basin Onshore Crude Oil + Lease Condensate...  

U.S. Energy Information Administration (EIA) Indexed Site

Production from Reserves (Million Barrels) California - San Joaquin Basin Onshore Crude Oil + Lease Condensate Estimated Production from Reserves (Million Barrels) Decade Year-0...

377

ALUMINUM DISTRIBUTIONSIN THE EURASIAN BASIN OF THE ARCTIC OCEAN  

E-Print Network [OSTI]

ALUMINUM DISTRIBUTIONSIN THE EURASIAN BASIN OF THE ARCTIC OCEAN A THESISSUBMITTEDTO THE GRADUATE Section(1994)cruiseswere analyzed for their aluminum (Al) content; these two data setswere then combined

Luther, Douglas S.

378

Data Acquisition-Manipulation At Nw Basin & Range Region (Blackwell...  

Open Energy Info (EERE)

References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard Smith, Jason McKenna (2003) Geothermal Resource Analysis And Structure Of Basin And Range...

379

Data Acquisition-Manipulation At Northern Basin & Range Region...  

Open Energy Info (EERE)

References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard Smith, Jason McKenna (2003) Geothermal Resource Analysis And Structure Of Basin And Range...

380

The dynamics and physical processes of the Comoros Basin.  

E-Print Network [OSTI]

??Includes abstract. The main objective of this thesis was to investigate the circulation in the ComorosBasin using observed and model datasets. These data were used… (more)

Collins, Charine

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Geographic Information System At Nw Basin & Range Region (Coolbaugh...  

Open Energy Info (EERE)

David Blackwell, Gary Oppliger (2005) A Map Of Geothermal Potential For The Great Basin, Usa- Recognition Of Multiple Geothermal Environments Additional References Retrieved from...

382

Data Acquisition-Manipulation At Northern Basin & Range Region...  

Open Energy Info (EERE)

David Blackwell, Gary Oppliger (2005) A Map Of Geothermal Potential For The Great Basin, Usa- Recognition Of Multiple Geothermal Environments Additional References Retrieved from...

383

Modeling-Computer Simulations At Northern Basin & Range Region...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

384

Teleseismic-Seismic Monitoring At Northern Basin & Range Region...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

385

Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

386

Modeling-Computer Simulations At Nw Basin & Range Region (Biasi...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

387

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

388

Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded  

Broader source: Energy.gov (indexed) [DOE]

Steven Chu to Attend Grand Opening of Recovery Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the Recovery Act, the A123 Systems battery plant is expected to create 3,000 jobs in Michigan by 2012 and help to establish the U.S. as a global leader in the manufacturing of electric vehicles. Following his speech, the Secretary will tour the production facility and participate in a media availability with elected officials and representatives from A123 Systems.

389

Microsoft Word - CX-GrandCoulee-ChiefJoseph_ARandWood Poles_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Todd Wehner Road Engineer - TELF-TPP-3 Robert Keudell Line Foreman III - TFWK-Grand Coulee Robert Zellar Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along portions of the Grand Coulee-Chief Joseph #1 and #2 230-kV transmission line rights-of-way. PP&A Project No: 1777 Work Order No.: 275582 and 275583 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

390

Microsoft Word - CX-GrandCoulee-OkanoganWP-AR-Landing_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Jim Semrau Robert Keudell Road Engineer - TELF-TPP-3 Line Foreman III - TFWK-Grand Coulee Todd Wehner Robert Zellar Road Engineer - TELF-TPP-3 Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along the Grand Coulee-Okanogan #2 115-kV transmission line right-of-way (ROW). PP&A Project No: 1776 Work Order No.: 275584 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

391

Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded  

Broader source: Energy.gov (indexed) [DOE]

Attend Grand Opening of Recovery Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the Recovery Act, the A123 Systems battery plant is expected to create 3,000 jobs in Michigan by 2012 and help to establish the U.S. as a global leader in the manufacturing of electric vehicles. Following his speech, the Secretary will tour the production facility and participate in a media availability with elected officials and representatives from A123 Systems.

392

Grand Challenges in Modeling, Simulation and Analysis: Extraction and Visualization of Power Systems  

SciTech Connect (OSTI)

Threats to the national electric power grid often require the coupling of real-time state data with look-ahead or forecasting models to provide timely disruption warnings. However, successful accomplishment of this capability presents a grand challenge in modeling, simulation, and analysis. Analysis of inter-area oscillatory modes may provide a new path to anticipate power system stability and address this grand challenge. An algorithm is presented for the identification and analysis of such modes from high resolution phasor measurement data that might indicate a pathway to meet this grand challenge. The process outlined includes data collection, conditioning, extraction of the primary oscillatory frequency, and determination of participating areas of the system.

Fernandez, Steven J [ORNL] [ORNL; Omitaomu, Olufemi A [ORNL] [ORNL

2010-01-01T23:59:59.000Z

393

Solid-State Lighting at Sandia National Laboratory - Grand Challenge LDRD  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

| | Sandia Press Releases & News Coverage | GRAND CHALLENGE LDRD PROJECT 6images of light To accelerate the development of the science and technology underlying Solid State Lighting, Sandia initiated, in October 2000, a multi-year Grand Challenge Laboratory Directed Research and Development (GCLDRD) project, " A Revolution in Lighting -- Building the Science and Technology Base for Ultra-Efficient Solid-State Lighting." This project is considered one of Sandia's most successful GCLDRDs. One way in which the SSL GCLDRD was different from others was that it coincided with a larger effort by the SSL community - primarily industrial companies investing in SSL, but also universities, trade organizations, and

394

Impacts of Irrigation on Citrus in the Lower Rio Grande Valley (Spanish)  

E-Print Network [OSTI]

Los impactos del riego de c?tricos en el Valle del R?o Grande B-6205S 05-08 3 Los c?tricos bajo riego, son de gran importancia econ?mica para el sur de Texas. Actualmente se cuenta con una superficie de 27,000 acres, principalmente en la parte... baja del valle del R?o Grande. A partir de 1950 el cultivo de c?tricos ha estado expuesto a heladas, variaciones de mercado y urbanizaci?n. Alrededor del 71% del ?rea de c?tricos est? plantada de toronjas y el 29%, de naranjas. Las variedades de...

Enciso, Juan; Sauls, Julian W.; Wiedenfeld, Robert P.; Nelson, Shad D.

2008-07-11T23:59:59.000Z

395

Union County - La Grande, Oregon geothermal district heating: feasibility assessment. Final report  

SciTech Connect (OSTI)

This report presents an assessment of geothermal district heating in the City of La Grande, Oregon. Eight study area districts were analyzed to determine their economic feasibility. Results from the analyses conclude that certain districts within the City of La Grande are economically feasible if certain assumptions are correct. Development of geothermal district heating for these areas would provide direct energy and dollar savings to the building owners and would also provide direct and indirect benefits to low and moderate income households within the City.

Jenkins, H. II; Giddings, M.; Hanson, P.

1982-09-01T23:59:59.000Z

396

E-Print Network 3.0 - austrian molasse basin Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

basin Page: << < 1 2 3 4 5 > >> 1 The El Mayah molasse basin in the Eastern Desert of Egypt A. Shalaby a,b,*, K. Stuwe a,*, H. Fritz a Summary: The El Mayah molasse basin in the...

397

Late Palaeozoic Basins of the Southern U.S. Continental Interior [Abstract] [and Discussion  

Science Journals Connector (OSTI)

5 May 1982 research-article Late Palaeozoic Basins of the Southern U.S. Continental Interior [Abstract] [and Discussion] J. F. Dewey W...georef;1985006010 basins economic geology energy sources folds intracratonic basins Paleozoic...

1982-01-01T23:59:59.000Z

398

Basin Analysis and Petroleum System Characterization and Modeling, Interior Salt Basins, Central and Eastern Gulf of Mexico  

SciTech Connect (OSTI)

The principal research effort for Year 3 of the project is basin modeling and petroleum system identification, comparative basin evaluation and resource assessment. In the first six (6) months of Year 3, the research focus is on basin modeling and petroleum system identification and the remainder of the year the emphasis is on the comparative basin evaluation and resource assessment. No major problems have been encountered to date, and the project is on schedule. The principal objectives of the project are to develop through basin analysis and modeling the concept that petroleum systems acting in a basin can be identified through basin modeling and to demonstrate that the information and analysis resulting from characterizing and modeling of these petroleum systems in the North Louisiana Salt Basin and the Mississippi Interior Salt Basin can be used in providing a more reliable and advanced approach for targeting stratigraphic traps and specific reservoir facies within a geologic system and in providing a refined assessment of undiscovered and underdeveloped reservoirs and associated oil and gas resources.

Ernest A. Mancini; Paul Aharon; Donald A. Goddard; Roger Barnaby

2006-02-28T23:59:59.000Z

399

Seismic interpretation, distribution, and basin modelling of natural gas leakage in block 2 of the Orange Basin, offshore South Africa.  

E-Print Network [OSTI]

??Includes abstract. The aims of this study are to: (1) characterize different natural gas leakage features present throughout the basin, and (2) understand the relationship… (more)

Boyd, Donna Louise.

2010-01-01T23:59:59.000Z

400

Estimating tectonic history through basin simulation-enhanced seismic inversion: geoinfomatics for sedimentary basins  

Science Journals Connector (OSTI)

......processes in response to geothermal gradient in much greater...approach not only reduces costs by integrating the basin...terms of temperature, energy, and with the probability...accepting a change in energy given through Boltzmann...proceeded in our choice of geothermal gradients (coarser......

Kush Tandon; Kagan Tuncay; Kyle Hubbard; John Comer; Peter Ortoleva

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Evolution and hydrocarbon prospectivity of the Douala Basin, Cameroon  

SciTech Connect (OSTI)

The Douala Basin is a stable Atlantic-type, predominantly offshore basin and forms the northern terminal of a series of divergent passive margin basins located on the Southwest coast of Africa that resulted from the rifting of Africa from South America. An integration of new studies including detailed well, biostratigraphic, sedimentological, geochemical and seismic data has confirmed that the tectonostratigraphic evolution in the basin can be broadly divided into three developmental phases: the Syn-rift, Transitional and Drift phases. This basis has been explored intermittently for hydrocarbon for the past 40 years with two important gas fields discovered and no commercial oil found as yet. This early gas discovery and a corresponding lack of any significant oil discovery, led early operators to term this basin as essentially a gas province. However, recent geochemical analyses of various oil-seeps and oil samples from various localities in the basin, using state-of-the-art techniques have demonstrated that this basin is a potential oil prone basin. The results show that two models of oil sourcing are possible: a Lower Cretaceous lacustrine saline source, similar to the presalt basins of Gabon or a marine Upper Cretaceous to lower Tertiary source, similar to the neighbouring Rio del Rey/Niger Delta Complex. Additionally, seismic reflection data also demonstrate a variety of reservoir horizons, including submarine fans, channel-like features and buried paleohighs, all interbedded within regionally extensive, uniformity bounded mudstone units. Hence, it is now quite evident that within this basin, there exist a vast potential for a wide variety of stratigraphic, structural and combined traps. These features, which are considered to have significantly enhanced the prospectivity of this basin, will be discussed in this paper.

Batupe, M.; Tampu, S.; Aboma, R.S. [National Hydrocarbons Corporation, Yaounde (Cameroon)

1995-08-01T23:59:59.000Z

402

Supai salt karst features: Holbrook Basin, Arizona  

SciTech Connect (OSTI)

More than 300 sinkholes, fissures, depressions, and other collapse features occur along a 70 km (45 mi) dissolution front of the Permian Supai Formation, dipping northward into the Holbrook Basin, also called the Supai Salt Basin. The dissolution front is essentially coincident with the so-called Holbrook Anticline showing local dip reversal; rather than being of tectonic origin, this feature is likely a subsidence-induced monoclinal flexure caused by the northward migrating dissolution front. Three major areas are identified with distinctive attributes: (1) The Sinks, 10 km WNW of Snowflake, containing some 200 sinkholes up to 200 m diameter and 50 m depth, and joint controlled fissures and fissure-sinks; (2) Dry Lake Valley and contiguous areas containing large collapse fissures and sinkholes in jointed Coconino sandstone, some of which drained more than 50 acre-feet ({approximately}6 {times} 10{sup 4} m{sup 3}) of water overnight; and (3) the McCauley Sinks, a localized group of about 40 sinkholes 15 km SE of Winslow along Chevelon Creek, some showing essentially rectangular jointing in the surficial Coconino Formation. Similar salt karst features also occur between these three major areas. The range of features in Supai salt are distinctive, yet similar to those in other evaporate basins. The wide variety of dissolution/collapse features range in development from incipient surface expression to mature and old age. The features began forming at least by Pliocene time and continue to the present, with recent changes reportedly observed and verified on airphotos with 20 year repetition. The evaporate sequence along interstate transportation routes creates a strategic location for underground LPG storage in leached caverns. The existing 11 cavern field at Adamana is safely located about 25 miles away from the dissolution front, but further expansion initiatives will require thorough engineering evaluation.

Neal, J.T.

1994-12-31T23:59:59.000Z

403

Devonian shale gas resource assessment, Illinois basin  

SciTech Connect (OSTI)

In 1980 the National Petroleum Council published a resource appraisal for Devonian shales in the Appalachian, Michigan, and Illinois basins. Their Illinois basin estimate of 86 TCFG in-place has been widely cited but never verified nor revised. The NPC estimate was based on extremely limited canister off-gas data, used a highly simplified volumetric computation, and is not useful for targeting specific areas for gas exploration. In 1994 we collected, digitized, and normalized 187 representative gamma ray-bulk density logs through the New Albany across the entire basin. Formulas were derived from core analyses and methane adsorption isotherms to estimate total organic carbon (r{sup 2}=0.95) and gas content (r{sup 2}=0.79-0.91) from shale bulk density. Total gas in place was then calculated foot-by-foot through each well, assuming normal hydrostatic pressures and assuming the shale is gas saturated at reservoir conditions. The values thus determined are similar to peak gas contents determined by canister off-gassing of fresh cores but are substantially greater than average off-gas values. Greatest error in the methodology is at low reservoir pressures (or at shallow depths), however, the shale is generally thinner in these areas so the impact on the total resource estimate is small. The total New Albany gas in place was determined by integration to be 323 TCFG. Of this, 210 TCF (67%) is in the upper black Grassy Creek Shale, 72 TCF (23%) in the middle black and gray Selmier Shale, and 31 TCF (10%) in the basal black Blocher Shale. Water production concerns suggest that only the Grassy Creek Shale is likely to be commercially exploitable.

Cluff, R.M.; Cluff, S.G.; Murphy, C.M. [Discovery Group, Inc., Denver, CO (United States)

1996-12-31T23:59:59.000Z

404

Devonian shale gas resource assessment, Illinois basin  

SciTech Connect (OSTI)

In 1980 the National Petroleum Council published a resource appraisal for Devonian shales in the Appalachian, Michigan, and Illinois basins. Their Illinois basin estimate of 86 TCFG in-place has been widely cited but never verified nor revised. The NPC estimate was based on extremely limited canister off-gas data, used a highly simplified volumetric computation, and is not useful for targeting specific areas for gas exploration. In 1994 we collected, digitized, and normalized 187 representative gamma ray-bulk density logs through the New Albany across the entire basin. Formulas were derived from core analyses and methane adsorption isotherms to estimate total organic carbon (r[sup 2]=0.95) and gas content (r[sup 2]=0.79-0.91) from shale bulk density. Total gas in place was then calculated foot-by-foot through each well, assuming normal hydrostatic pressures and assuming the shale is gas saturated at reservoir conditions. The values thus determined are similar to peak gas contents determined by canister off-gassing of fresh cores but are substantially greater than average off-gas values. Greatest error in the methodology is at low reservoir pressures (or at shallow depths), however, the shale is generally thinner in these areas so the impact on the total resource estimate is small. The total New Albany gas in place was determined by integration to be 323 TCFG. Of this, 210 TCF (67%) is in the upper black Grassy Creek Shale, 72 TCF (23%) in the middle black and gray Selmier Shale, and 31 TCF (10%) in the basal black Blocher Shale. Water production concerns suggest that only the Grassy Creek Shale is likely to be commercially exploitable.

Cluff, R.M.; Cluff, S.G.; Murphy, C.M. (Discovery Group, Inc., Denver, CO (United States))

1996-01-01T23:59:59.000Z

405

HANFORD K BASINS SLUDGE RETREIVAL & TREATMENT  

SciTech Connect (OSTI)

This paper shows how Fluor Hanford and BNG America have combined nuclear plant skills from the US and the UK to devise methods to retrieve and treat the sludge that has accumulated in K Basins at the Hanford site over many years. Retrieving the sludge is the final stage in removing fuel and sludge from the basins to allow them to be decontaminated and decommissioned, thus removing the threat of contamination of the Columbia River. A description is given of sludge retrieval using vacuum lances and specially developed nozzles and pumps into Consolidation Containers within the basins. The special attention that had to be paid to the heat generation and potential criticality issues with the irradiated uranium-containing sludge is described. The processes developed to re-mobilize the sludge from the Consolidation Containers and pump it through flexible and transportable hose-in-hose piping to the treatment facility are explained with particular note made of dealing with the abrasive nature of the sludge. The treatment facility, housed in an existing Hanford building is described, and the uranium-corrosion and grout encapsulation processes explained. The uranium corrosion process is a robust, tempered process very suitable for dealing with a range of differing sludge compositions. The grout process to produce the final waste form is backed by BNG America's 20 years experience of grouting radioactive waste at Sellafield and elsewhere. The use of transportable and re-usable equipment is emphasized and its role noted in avoiding new plant build that itself will require cleanup. The processes and techniques described in the paper are shown to have wide applicability to nuclear cleanup worldwide.

VASQUEZ, D.A.

2005-07-05T23:59:59.000Z

406

Baroclinic tides in an axially symmetric basin  

E-Print Network [OSTI]

Energetics Returning to the governing equations (66) through (6&7) and multiplving (66) by phu?, (66) by phv?, and (67) by php?gives the result; phu?? f v?~ ? ~ ~ p S? m=O 0(, = phu?g h?o, c3 T f&hv?g o'j r SH (96) (96) aud ap? 1 a I au? I ~ ah.... Rowe (Head of Department) December 1989 ABSTRACT Baroclinic Tides in an Axially Symmetric Basin. (December 1989) Edward Paul Dever. B. S. , Texas Ag-XI University Chair ol' Advisory Committee: Prof. Robert 0. Reid A. coupled normal mode model...

Dever, Edward Paul

2012-06-07T23:59:59.000Z

407

DOE/EA-1312: Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (September 1999)  

Broader source: Energy.gov (indexed) [DOE]

2 2 Rev. 0 Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) Final September 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy EA of Ground Water Compliance at the Grand Junction UMTRA Project Site DOE Grand Junction Office Page ii Final September 1999 Contents Executive Summary.........................................................................................................................v 1.0 Introduction...............................................................................................................................1 1.1 Grand Junction UMTRA Project Site Location and Description.........................................1

408

Driver and Pedestrian Behavior at Uncontrolled Crosswalks in the Tahoe Basin Recreation Area  

E-Print Network [OSTI]

in the Tahoe Basin Recreation Area Meghan Fehlig Mitman,in the Tahoe Basin Recreation Area Submission Date: Augusttraverses rural and/or recreation areas, the findings from

Mitman, Meghan Fehlig; Cooper, Douglas; DuBose, Brooke

2010-01-01T23:59:59.000Z

409

E-Print Network 3.0 - active single basin Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

basins... ) existed during the Late Oligocene and Miocene when the rift basins of Thailand were active because active... into three main areas and tec- tonic provinces: 1)...

410

The Persian Gulf Basin: Geological history, sedimentary formations, and petroleum potential  

Science Journals Connector (OSTI)

The Persian Gulf Basin is the richest region of the ... Foredeep, which is a member of the Persian Gulf Basin. During the most part of the...

A. I. Konyuhov; B. Maleki

411

Screening model optimization for Panay River Basin planning in the Philippines .  

E-Print Network [OSTI]

??The state of the water resources of the Panay River Basin have motivated studies and initial basin planning to mitigate flood damages, to produce hydroelectricity,… (more)

Millspaugh, John Henry

2010-01-01T23:59:59.000Z

412

E-Print Network 3.0 - african river basin Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

<< < 1 2 3 4 5 > >> 1 Adaptation to climate change in international river basins in Africa: a review* Summary: ). There are 60 international river basins within the African...

413

ADCP-Referenced Geostrophic Circulation in the Bering Sea Basin  

Science Journals Connector (OSTI)

A month-long circumnavigation of the Bering Sea basin in August 1991 was designed to study the basin-scale circulation. For the first time in this region vessel-mounted acoustic Doppler current profiler (ADCP) measurements provided an absolute ...

E. D. Cokelet; M. L. Schall; D. M. Dougherty

1996-07-01T23:59:59.000Z

414

Hydrocarbons in rift basins: the role of stratigraphy  

Science Journals Connector (OSTI)

...succession that causes the shales to reach thermal maturity and generate hydrocarbons. Simple...T. J. 1988 Rift basins of interior Sudan--petroleum exploration and discovery...basins? Is that what we could call the thermal subsidence phase? J. J. Lambiase...

1999-01-01T23:59:59.000Z

415

Origin Basin Destination State STB EIA STB EIA Northern Appalachian...  

Gasoline and Diesel Fuel Update (EIA)

- W - W W W - W Central Appalachian Basin Alabama 26.18 26.10 -0.3% 118.06 22.1% 930 37.4% 100.0% Central Appalachian Basin Delaware 23.73 15.12 -36.3% 88.59 17.1%...

416

Social learning among Congo Basin hunter–gatherers  

Science Journals Connector (OSTI)

...Kevin N. Laland Social learning among Congo Basin hunter-gatherers Barry S. Hewlett...Central African Republic and Republic of Congo. We have conducted several years of qualitative...daily life and demographic features of Congo Basin hunter-gatherers and farmers...

2011-01-01T23:59:59.000Z

417

Congo Basin rainfall climatology: can we believe the climate models?  

Science Journals Connector (OSTI)

...Asare, Simon Lewis and Philippe Mayaux Congo Basin rainfall climatology: can we believe...rainforests: past, present and future . The Congo Basin is one of three key convective regions...rainfall products and climate models. Congo rainfall|climatology|moisture flux...

2013-01-01T23:59:59.000Z

418

Microbial Biomass and Activity Distribution in an Anoxic, Hypersaline Basin  

Science Journals Connector (OSTI)

...the northern Gulf of Mexico with anoxic conditions...the northern Gulf of Mexico with anoxic conditions...basin in the Gulf of Mexico. The Orca Basin, as...Table 1 is a result of geothermal heat brought into the...sulfate-reducing as well as sulfide-oxidizing...

Paul A. LaRock; Ray D. Lauer; John R. Schwarz; Kathleen K. Watanabe; Denis A. Wiesenburg

1979-03-01T23:59:59.000Z

419

THE HISTORICAL YOLO BASIN What parts make the whole?  

E-Print Network [OSTI]

THE HISTORICAL YOLO BASIN LANDSCAPE What parts make the whole? Alison Whipple San Francisco Estuary The spatial and temporal variability of the Delta reflected fluvial-tidal interaction #12;YOLO BASIN NORTHEAST prevalent at the north end and along Miner Slough..." - Mellin 1918 North End Liberty Island Yolo By Pass

420

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Appendices  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Appendices Grand County, Colorado June 2013 Appendix A EIS Scoping Report GRANBY PUMPING PLANT - WINDY GAP TRANSMISSION LINE REBUILD PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING SUMMARY REPORT December 4, 2007

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Grand Challenges Special Solicitation The Office of Research and Sponsored Projects issues this Special Request for Proposals (RFP) related  

E-Print Network [OSTI]

Grand Challenges as "ambitious but achievable goals that harness science, technology, and innovation · Focused and specific · Harnessing innovation and advances in Science and Technology · Real Challenge (DOE) http://www1.eere.energy.gov/vehiclesandfuels/electric_vehicle s/index.html Asteroid Grand

Kreinovich, Vladik

422

Journal of Coastal Research, Special Issue No. XX, 2014 The Grand Popo beach 2013 experiment, Benin, West Africa 1  

E-Print Network [OSTI]

the coast, together with large population densities (main cities: Abidjan, ABSTRACT Almar, R., Hounkonnou, N, West Africa 1 The Grand Popo beach 2013 experiment, Benin, West Africa: from short timescale processes., and Kestenare, E., 2014. The Grand Popo beach 2013 experiment, Benin, West Africa: from short timescale

423

Grand Rapids Community College & Michigan State University LANDSCAPE & LAWN MANAGEMENT PROGRAM  

E-Print Network [OSTI]

­ Landscape Maintenance 2 HRT 214 ­ Landscape and Turfgrass Business Operations 2 PLP 104 ­ Applied PlantGrand Rapids Community College & Michigan State University LANDSCAPE & LAWN MANAGEMENT PROGRAM GRCC an Associate of Applied Arts and Science Degree from GRCC as well as the Landscape & Lawn Management

Isaacs, Rufus

424

Grand Rapids Community College & Michigan State University LANDSCAPE and LAWN MANAGEMENT PROGRAM  

E-Print Network [OSTI]

Landscape Plants II 3 HRT 213 Landscape Maintenance 2 HRT 214 Landscape and Turfgrass Business Operations 2Grand Rapids Community College & Michigan State University LANDSCAPE and LAWN MANAGEMENT PROGRAM MSU Landscape & Lawn Management Certificate MSU Contact: Marcus Duck, Program Coordinator ­ (517) 355

Isaacs, Rufus

425

SunShot Grand Challenge Summit: Bright Outlook to Achieve SunShot Goal  

Office of Energy Efficiency and Renewable Energy (EERE)

Last week, hundreds of solar energy leaders gathered in southern California to participate in SunShot’s biennial Grand Challenge Summit. Read a recap of the four-day event, which focused on making solar energy fully cost-competitive with traditional forms of energy by 2020.

426

DOMESTIC'S SEPTIC TANKS CONTRIBUTION TO THE POLLUTION OF THE RO GRANDE DE AASCO  

E-Print Network [OSTI]

DOMESTIC'S SEPTIC TANKS CONTRIBUTION TO THE POLLUTION OF THE RÍO GRANDE DE A�ASCO Widaliz Pujols, animal farms, and domestic septic tanks. These pollutant sources are classified as non-point pollutant sources. Crops and domestic's septic tanks are very close to the Añasco River. Crops needs organic

Gilbes, Fernando

427

International Agriculture Fellowship: A Gates Foundation Grand Challenges Exploration in Endophytic Biological Control  

E-Print Network [OSTI]

International Agriculture Fellowship: A Gates Foundation Grand Challenges Exploration in Endophytic Biological Control Who we are: The International Center for Tropical Agriculture (CIAT) is a member institute of the Consultative Group on International Agricultural Research (CIAR). Based in Cali, Colombia, we focus

Ferrara, Katherine W.

428

Avian diversity in a priority area for conservation in North America: the Janos-Casas Grandes  

E-Print Network [OSTI]

in revised form 24 March 2005 Key words: Chihuahua, Conservation, Grassland birds, Mexico, Migratory birds on the Janos-Casas Grandes Prairie Dog Complex of Northwestern Chihuahua, Mexico. Avian diversity totalled 227 for the protection of grasslands and their associated fauna. Introduction Located in northwestern Chihuahua, Mexico

Nacional Autónoma de México, Universidad

429

EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in Electric Vehicles  

Broader source: Energy.gov [DOE]

Learn about the Clean Energy Grand Challenge to have the U.S. become the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years.

430

Grand vision for future ESRL Carbon Cycle Effort Contribution to GEOSS In situ  

E-Print Network [OSTI]

Grand vision for future ESRL Carbon Cycle Effort · Contribution to GEOSS ­ In situ GHG monitoring (~weekly) NOAA Tall Tower Partner regional networks #12;Hypothetical Future GEOSS In Situ GHG NetworkHypothetical Future GEOSS In Situ GHG Network #12;Hypothetical Future GEOSS In Situ GHG NetworkHypothetical Future

431

Grand Opening of Abengoa’s Biorefinery: Nation’s Third Commercial-Scale Facility  

Broader source: Energy.gov [DOE]

The nation’s third commercial-scale cellulosic ethanol biorefinery celebrates its grand opening on October 17, 2014, in Hugoton, Kansas. The Abengoa Bioenergy Biomass of Kansas (ABBK) facility is the first of its kind to use a proprietary enzymatic hydrolysis process which turns cellulosic biomass into fermentable sugars that are then converted into transportation fuels.

432

Independent External Peer Review Rio Grande Floodway, San Acacia to Bosque Del Apache,  

E-Print Network [OSTI]

Independent External Peer Review Rio Grande Floodway, San Acacia to Bosque Del Apache, New Mexico. 1) Contract No. W912HQ-11-D-0002 10 August 2012 #12;Independent External Peer Review Report (Rev. 1 of Panel 6 3.3 Preparation and Charge for Peer Review Panel 7 3.4 Performing the IEPR 8 3

US Army Corps of Engineers

433

Grand challenge problems in environmental modeling and remediation: groundwater contaminant transport  

SciTech Connect (OSTI)

This report describes briefly the work of the Center for Subsurface Modeling (CSM) of the University of Texas at Austin (and Rice University prior to September 1995) on the Partnership in Computational Sciences Consortium (PICS) project entitled Grand Challenge Problems in Environmental Modeling and Remediation: Groundwater Contaminant Transport.

Todd Arbogast; Steve Bryant; Clint N. Dawson; Mary F. Wheeler

1998-08-31T23:59:59.000Z

434

Data Mining: Data Analysis on a Grand Scale? \\Lambda Padhraic Smyth  

E-Print Network [OSTI]

Data Mining: Data Analysis on a Grand Scale? \\Lambda Padhraic Smyth Information and Computer data mining has evolved largely as a result of efforts by computer scientists to address the needs of ``data owners'' in extracting useful information from massive observational data sets. Because

Smyth, Padhraic

435

California basin study (CaBS)  

SciTech Connect (OSTI)

Previous studies of geochemical recycling processes in the upper water column in the Southern California Bight focused on the seasonal cycle. Inspection of satellite sea surface color images as well as information from studies in other areas suggest that the cycling processes have significant variability on time scales of hours and days. To allow our seasonal studies to be examined in the context of the higher frequency variability, an interdisciplinary mooring was maintained near the midpoint of Santa Monica basin (known as station 305) from January to July, 1990. The Hickey group had the primary responsibility of deploying and recovering the mooring. The mooring consisted of a vector measuring wind recorder mounted above a toroidal buoy, below which were suspended two current/temperature recorders, a trnasmissometer, and two PAR sensors. The PAR sensors, which provide an estimate of phytoplankton growth rates, were deployed as part of the Trees proposal. At two additional nearby moorings, sediment traps were deployed at selected depths throughout the water column by Landry and by Soutar. To allow some investigation of lateral advection of material, current meters were deployed at the same depths as several of the sediment traps both at this site and also at the site farther along the basin axis. The data from these experiments have not yet been processed. 6 refs., 10 figs.

Hickey, B.M.

1990-01-01T23:59:59.000Z

436

Shale Gas Development in the Susquehanna River Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Water Resource Challenges Water Resource Challenges From Energy Production Major Types of Power Generation in SRB - Total 15,300 Megawatts - 37.5% 4.0% 12.0% 15.5% 31.0% Nuclear Coal Natural Gas Hydroelectric Other Marcellus Shale Gas Development in the Susquehanna River Basin The Basin: * 27,510-square-mile watershed * Comprises 43 percent of the Chesapeake Bay watershed * 4.2 million population * 60 percent forested * 32,000+ miles of waterways The Susquehanna River: * 444 miles, largest tributary to the Chesapeake Bay * Supplies 18 million gallons a minute to the Bay Susquehanna River Basin Geographic Location of Marcellus Shale within Susq. River Basin 72% of Basin (20,000 Sq. Miles) Underlain by Marcellus Shale Approximate Amount of Natural Gas in Marcellus Shale * U.S. currently produces approx. 30 trillion

437

Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying  

Broader source: Energy.gov (indexed) [DOE]

K Basin and Cold Vacuum K Basin and Cold Vacuum Drying Facility - August 2012 Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 August 2012 Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations The purpose of this independent oversight review by the U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS) was to observe the operations associated with processing a Multi-Canister Overpack (MCO) of "found fuel" (small quantities of spent fuel discovered during cleanup of the reactor burial grounds) at the Cold Vacuum Drying Facility (CVDF). The found fuel MCO was transported from the K West Basin on the Hanford

438

Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying  

Broader source: Energy.gov (indexed) [DOE]

Hanford K Basin and Cold Vacuum Hanford K Basin and Cold Vacuum Drying Facility - August 2012 Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 August 2012 Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations The purpose of this independent oversight review by the U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS) was to observe the operations associated with processing a Multi-Canister Overpack (MCO) of "found fuel" (small quantities of spent fuel discovered during cleanup of the reactor burial grounds) at the Cold Vacuum Drying Facility (CVDF). The found fuel MCO was transported from the K West Basin on the Hanford

439

Numerical Modeling of Transient Basin and Range Extensional Geothermal  

Open Energy Info (EERE)

Transient Basin and Range Extensional Geothermal Transient Basin and Range Extensional Geothermal Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Numerical Modeling of Transient Basin and Range Extensional Geothermal Systems Abstract A suite of models utilizing a range of bulkrock permeabilities were developed to analyze thetransient behavior of basin and range extensionalgeothermal systems, and particularly, the evolution ofthe system temperature with time. Each modelconsists of two mountain ranges (~1 km relief fromthe valley floor) separated by a thick sequence (about4 km) of clastic sediments derived from the adjacentranges, and a relatively permeable, high angle faultthat functions as a conduit for subsurface fluids. Thisgeometry is typical of Basin and Range extensionalsystems.We

440

Geothermal Reservoir Assessment Case Study, Northern Basin and Range  

Open Energy Info (EERE)

Reservoir Assessment Case Study, Northern Basin and Range Reservoir Assessment Case Study, Northern Basin and Range Province, Northern Dixie Valley, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal Reservoir Assessment Case Study, Northern Basin and Range Province, Northern Dixie Valley, Nevada Abstract N/A Authors Elaine J. Bell, Lawrence T. Larson and Russell W. Juncal Published U.S. Department of Energy, 1980 Report Number GLO2386 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Geothermal Reservoir Assessment Case Study, Northern Basin and Range Province, Northern Dixie Valley, Nevada Citation Elaine J. Bell,Lawrence T. Larson,Russell W. Juncal. 1980. Geothermal Reservoir Assessment Case Study, Northern Basin and Range Province,

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Accomplishments At The Great Basin Center For Geothermal Energy | Open  

Open Energy Info (EERE)

Accomplishments At The Great Basin Center For Geothermal Energy Accomplishments At The Great Basin Center For Geothermal Energy Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Accomplishments At The Great Basin Center For Geothermal Energy Details Activities (0) Areas (0) Regions (0) Abstract: The Great Basin Center for Geothermal Energy (GBCGE) has been funded by DOE since March 2002 to conduct geothermal resource exploration and assessment in the Great Basin. In that time, those efforts have led to significant advances in understanding the regional and local conditions necessary for the formation of geothermal systems. Accomplishments include the development of GPS-based crustal strain rate measurements as a geothermal exploration tool, development of new methods of detecting geothermal features with remotely sensed imagery, and the detection of

442

Relating Geothermal Resources To Great Basin Tectonics Using Gps | Open  

Open Energy Info (EERE)

Relating Geothermal Resources To Great Basin Tectonics Using Gps Relating Geothermal Resources To Great Basin Tectonics Using Gps Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Relating Geothermal Resources To Great Basin Tectonics Using Gps Details Activities (8) Areas (4) Regions (0) Abstract: The Great Basin is characterized by non-magmatic geothermal fields, which we hypothesize are created, sustained, and controlled by active tectonics. In the Great Basin, GPS-measured rates of tectonic "transtensional" (shear plus dilatational) strain rate is correlated with geothermal well temperatures and the locations of known geothermal fields. This has led to a conceptual model in which non-magmatic geothermal systems are controlled by the style of strain, where shear (strike-slip faulting)

443

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

444

Corrosion of aluminum alloys in a reactor disassembly basin  

SciTech Connect (OSTI)

This document discusses storage of aluminum clad fuel and target tubes of the Mark 22 assembly takes place in the concrete-lined, light-water-filled, disassembly basins located within each reactor area at the Savannah River Site (SRS). A corrosion test program has been conducted in the K-Reactor disassembly basin to assess the storage performance of the assemblies and other aluminum clad components in the current basin environment. Aluminum clad alloys cut from the ends of actual fuel and target tubes were originally placed in the disassembly water basin in December 1991. After time intervals varying from 45--182 days, the components were removed from the basin, photographed, and evaluated metallographically for corrosion performance. Results indicated that pitting of the 8001 aluminum fuel clad alloy exceeded the 30-mil (0.076 cm) cladding thickness within the 45-day exposure period. Pitting of the 1100 aluminum target clad alloy exceeded the 30-mil (0.076 cm) clad thickness in 107--182 days exposure. The existing basin water chemistry is within limits established during early site operations. Impurities such as Cl{sup {minus}}, NO{sub 3}{sup {minus}} and SO{sub 4}{sup {minus}} are controlled to the parts per million level and basin water conductivity is currently 170--190 {mu}mho/cm. The test program has demonstrated that the basin water is aggressive to the aluminum components at these levels. Other storage basins at SRS and around the US have successfully stored aluminum components for greater than ten years without pitting corrosion. These basins have impurity levels controlled to the parts per billion level (1000X lower) and conductivity less than 1.0 {mu}mho/cm.

Howell, J.P.; Zapp, P.E.; Nelson, D.Z.

1992-12-01T23:59:59.000Z

445

Basin configuration and depositional trends in the Mission Canyon and Ratcliffe beds, U.S. portion of the Williston basin  

SciTech Connect (OSTI)

Construction of Mission Canyon and Ratcliffe depositional trends utilizing shoreline models and anhydrite edge maps shows a significant change in basin configuration associated with regional sea level changes. Sea level highstand, which began during deposition of the Scallion member of the Lodgepole Formation, was punctuated by two lowstand events. The first occurred during deposition of the MC-2 anhydrite (Tilston). During this lowstand event, the width of the carbonate basin decreased significantly. With sea level rise, a broad basin formed with carbonate and evaporate ramp deposition (Lands, Wayne, Glenburn and Mohall members). The top of the Mohall contains evidence of the second lowstand event. This event introduced quartz sand detritus into the basin (Kisbey Sandstone). Because of sea level lowstand, Sherwood and younger Mission Canyon beds were deposited during highstand in a narrower carbonate basin. Funneling of marine currents and tides in this basin created higher energy shoreline and shoal deposits than those commonly found in older Mission Canyon sediments. The top of the Mission Canyon (Rival) was capped by a deepening event or transgression which enlarged the basin and created broad Ratcliffe ramp systems similar to those that existed during Glenburn and Mohall deposition. By utilizing sequence stratigraphy and mapping shoreline trends and basin configuration, reservoir and trap geometries are identified, and exploration success is improved.

Hendricks, M.L. [Hendricks and Associates, Inc., Englewood, CO (United States)

1996-06-01T23:59:59.000Z

446

DOE/EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Project Office To Non-DOE Ownership (04/25/00)  

Broader source: Energy.gov (indexed) [DOE]

8 8 F I N A L Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy * Grand Junction Office * 2597 B ¾ Road * Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final DOE/EA-1338 FINAL Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy Grand Junction Office 2597 B ¾ Road Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final i April 2000 TABLE OF CONTENTS Title Page Table of Contents ......................................................................................................................................... i List of Figures ............................................................................................................................................iii

447

Flood pulse trophic dynamics of larval fishes in a restored arid-land, river-floodplain, Middle Rio Grande, Los Lunas, New Mexico  

Science Journals Connector (OSTI)

The Rio Grande silvery minnow (Hybognathus amarus...) was historically the most abundant fish in the Rio Grande and Pecos River occupying approximately 3,800 river km from Colorado to the Gulf of Mexico (Bestgen ...

Hugo A. Magaña

2013-12-01T23:59:59.000Z

448

U.S. Department of Energy NEPA Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

OR-TRIBE-CONFEDERATED TRIBES OF THE GRAND RONDE OR-TRIBE-CONFEDERATED TRIBES OF THE GRAND RONDE COMMUNITY OF OREGON Location: Tribe OR-TRIBE- CONFEDERATED TRIBES OF THE GRAND RONDE COMMUNITY OF OREGON OR American Recovery and Reinvestment Act: Proposed Action or Project Descriptio 1) Acquire technical services to assist with development of the tribal energy efficiency and conservation strategy (completed, CX approved August 8, 2009); 2) acquire technical services to perform energy efficiency audits on select tribal buildings; 3) re-commission Governance Center (1998, no replacement of equipment involved); 4) perform energy efficiency and conservation retrofits on the Natural Resources Department Maintenance Shop (1997)-APPROVAL is for insulation enhancement and thermostat

449

DOE West Coast Basin program, California Basin Study: Progress report 4, (July 1986-June 1987)  

SciTech Connect (OSTI)

The overall objective of our research is to understand the transport pathways and mass balances of selected metabolically active and inactive chemical species in the Santa Monica/San Pedro Basins. One focus is to examine the role of zooplankton and micronekton in the cycling and remineralization of chemical materials in the Southern California Bight, with particular reference to C, N and certain radionuclides and trace metals. A second focus is to examine these same radionuclides and trace metals in other reservoirs besides the zooplankton (i.e., in seawater, sediment trap material and bottom sediments). Knowledge of the rates, routes and reservoirs of these nuclides and metals should lead to a cogent model for these elements in Santa Monica/San Pedro Basins. 28 refs., 13 figs., 7 tabs.

Small, L.F.; Huh, Chih-An

1987-06-01T23:59:59.000Z

450

Carderock Maneuvering & Seakeeping Basin | Open Energy Information  

Open Energy Info (EERE)

Maneuvering & Seakeeping Basin Maneuvering & Seakeeping Basin Jump to: navigation, search Basic Specifications Facility Name Carderock Maneuvering & Seakeeping Basin Overseeing Organization United States Naval Surface Warfare Center Hydrodynamic Testing Facility Type Wave Basin Length(m) 109.7 Beam(m) 73.2 Depth(m) 6.1 Water Type Freshwater Cost(per day) Contact POC Special Physical Features 10.7m deep x 15.2m wide trench along length of tank; the Maneuvering & Seakeeping Basin is spanned lengthwise by a 114.6m bridge supported on a rail system that permits the bridge to traverse one-half the width of the basin and to rotate through angles up to 45 degrees from the longitudinal centerline of the basin, ship models can be towed in head or following seas at any angle from 0 to 90 degrees, tracks attached to the bottom of the bridge support the towing carriage, bridge width is constant 6.1m.

451

Basin Analysis and Petroleum System Characterization and Modeling, Interior Salt Basins, Central and Eastern Gulf of Mexico  

SciTech Connect (OSTI)

The principal research effort for Phase 1 (Concept Development) of the project has been data compilation; determination of the tectonic, depositional, burial, and thermal maturation histories of the North Louisiana Salt Basin; basin modeling (geohistory, thermal maturation, hydrocarbon expulsion); petroleum system identification; comparative basin evaluation; and resource assessment. Existing information on the North Louisiana Salt Basin has been evaluated, an electronic database has been developed, and regional cross sections have been prepared. Structure, isopach and formation lithology maps have been constructed, and burial history, thermal maturation history, and hydrocarbon expulsion profiles have been prepared. Seismic data, cross sections, subsurface maps and burial history, thermal maturation history, and hydrocarbon expulsion profiles have been used in evaluating the tectonic, depositional, burial and thermal maturation histories of the basin. Oil and gas reservoirs have been found to be associated with salt-supported anticlinal and domal features (salt pillows, turtle structures and piercement domes); with normal faulting associated with the northern basin margin and listric down-to-the-basin faults (state-line fault complex) and faulted salt features; and with combination structural and stratigraphic features (Sabine and Monroe Uplifts) and monoclinal features with lithologic variations. Petroleum reservoirs include Upper Jurassic and Cretaceous fluvial-deltaic sandstone facies; shoreline, marine bar and shallow shelf sandstone facies; and carbonate shoal, shelf and reef facies. Cretaceous unconformities significantly contribute to the hydrocarbon trapping mechanism capacity in the North Louisiana Salt Basin. The chief petroleum source rock in this basin is Upper Jurassic Smackover lime mudstone beds. The generation of hydrocarbons from Smackover lime mudstone was initiated during the Early Cretaceous and continued into the Tertiary. Hydrocarbon expulsion commenced during the Early Cretaceous and continued into the Tertiary with peak expulsion occurring during the Early to Late Cretaceous. The geohistory of the North Louisiana Salt Basin is comparable to the Mississippi Interior Salt Basin with the major difference being the elevated heat flow the strata in the North Louisiana Salt Basin experienced in the Cretaceous due primarily to reactivation of upward movement, igneous activity, and erosion associated with the Monroe and Sabine Uplifts. Potential undiscovered reservoirs in the North Louisiana Salt Basin are Triassic Eagle Mills sandstone and deeply buried Upper Jurassic sandstone and limestone. Potential underdeveloped reservoirs include Lower Cretaceous sandstone and limestone and Upper Cretaceous sandstone.

Ernest A. Mancini; Paul Aharon; Donald A. Goddard; Roger Barnaby

2006-05-26T23:59:59.000Z

452

square-mile Black Warrior Basin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

will inject CO will inject CO 2 into a coalbed methane (CBM) well in Tuscaloosa County, Alabama, to assess the capability of mature CBM reservoirs to receive and adsorb large volumes of CO 2 . Injection began at the test site on June 15; the site was selected because it is representative of the 23,000- square-mile Black Warrior Basin located in northwestern Alabama and northeastern Mississippi. It is estimated that this area has the potential to store in the range of 1.1 to 2.3 Gigatons of CO 2 , which is approximately the amount that Alabama's coal-fired power plants emit in two decades. The targeted coal seams range from 940 to 1,800 feet deep and are one to six feet thick. Approximately 240 tons of CO 2 will be injected over a 45- to 60-day period. More information

453

April, 30 2005 Aspen, Colorado Andreas Haungs KASCADE-Grande Collaboration `Physics from the Knee to the Ankle Investigating the 2nd Knee  

E-Print Network [OSTI]

the Knee to the Ankle´ Investigating the 2nd Knee: KASCADE-Grande Andreas Haungs haungs ­ KASCADE-Grande Collaboration `Physics from the Knee to the Ankle´ Cosmic Rays around the knee: What-Grande Collaboration `Physics from the Knee to the Ankle´ Measurements of air showers in the energy range E0 = 100 Te

454

Petroleum systems of the Southwest Caspian Basin  

SciTech Connect (OSTI)

The Southwest Caspian Basin, located in offshore Azerbaijan, contains significant accumulations of oil and gas in Upper Tertiary siliciclastic sediments. The central basin contains up to 25 km of sediments. The relatively low geothermal gradients and low degree of compaction from rapid burial provide favorable conditions or the retention of hydrocarbons at relatively great depths. A variety of structural styles occur, ranging from anticlinal folds to monoclines, with various degrees of reverse faulting and brecciation. Molecular characterization of selected oil samples indicate most of the oils have been sourced form the same or similar facies; a Tertiary Type II, slightly calcareous, marine clastic facies. Insufficient organic-rich rocks are available for a reliable oil-source correlation. Examination of oil molecular characteristics, oil-oil correlations, molecular characteristics of key stratigraphic horizons, paleofacies maps, maturation, and potential migration pathways suggest the oil was not syngenetic but most likely sourced from deeper Oligo-Miocene or older marine shales. Compositional data for a single offshore gas sample suggest the gas is a mixture of low maturity Type III and biogenic. A multi-stage model of hydrocarbon emplacement for evolving structural traps has been postulated. The first phase of emplacement occurred in the Middle Pliocene when tectonic movement and significant subsidence initiated early trap/reservoir formation, migration, and hydrocarbon generation. Late Quaternary tectonic activity lead to the replenishment of older depleted traps, additional hydrocarbons for enhanced traps, and charging of new traps. In addition, late tectonic activity caused extensive redistribution of hydrocarbon accumulations, degassing due to breached faults, and destruction of selected oil pools.

Abrams, M.A.; Narimanov, A.A. [State Oil Company of Azerbaijan, Baku (Azerbaijan)

1995-08-01T23:59:59.000Z

455

Effects of Cougar Predation and Nutrition on Mule Deer Population Declines in the IM Province of the Columbia Basin, Annual Report 2002-2003.  

SciTech Connect (OSTI)

Construction of the Grand Coulee and Chief Joseph dams has resulted in inundation and loss of 29,125 total habitat units for mule deer and irrigation agriculture in many parts the Intermountain Province (IM) of the Columbia Basin. Mule deer in the Shrub-Steppe are ranked high priority target species for mitigation and management and are declining in most portions of the sub basins of the IM. Reasons for the decline are unknown but believed to be related to habitat changes resulting from dams and irrigation agriculture. White-tailed deer are believed to be increasing throughout the basin because of habitat changes brought about by the dams and irrigation agriculture. Recent research (1997-2000) in the NE IM and adjacent Canadian portions of the Columbia Basin (conducted by this author and funded by the Columbia Basin Fish & Wildlife Compensation Program B.C.), suggest that the increasing white-tailed deer populations (because of dams and irrigation agriculture) are resulting in increased predation by cougars on mule deer (apparent competition or alternate prey hypothesis). The apparent competition hypothesis predicts that as alternate prey (white-tailed deer) densities increase, so do densities of predators, resulting in increased incidental predation on sympatric native prey (mule deer). Apparent competition can result in population declines and even extirpation of native prey in some cases. Such a phenomenon may account for declines of mule deer in the IM and throughout arid and semi-arid West where irrigation agriculture is practiced. We will test the apparent competition hypothesis by conducting a controlled, replicated 'press' experiment in at least 2 treatment and 2 control areas of the IM sub basins by reducing densities of white-tailed deer and observing any changes in cougar predation on mule deer. Deer densities will be monitored by WADFW personnel using annual aerial surveys and/or other trend indices. Predation rates and population growth rates of deer will be determined using radio telemetry. Changes in cougar functional (kills/unit time), aggregative (cougars/unit area), numerical (offspring/cougar), and total (predation rate) responses on deer will also be monitored using radio telemetry. The experiment will be conducted and completed over a period of 5 years. Results will be used to determine the cause and try to halt the mule deer population declines. Results will also guide deer mitigation and management in the IM and throughout the North American West.

Wielgus, Robert; Shipley, Lisa; Myers, Woodrow

2003-09-01T23:59:59.000Z

456

The Caribbean Basin: A prime market for renewables  

SciTech Connect (OSTI)

Countries in the Caribbean basin have high energy prices and need additional electrical generating capacity. Renewable energy and independent power sources could help meet that need. The Caribbean Basin and the Pacific Rim appear to offer the best total market opportunities considering government energy policies, prices of energy, and consumer attitudes on renewable energy applications. The Caribbean Basin was selected for an industry project opportunity review. This area was selected due to its proximity, renewable resource base, need for energy and growth, and potential for private and multidevelopment bank funding of projects. 3 figs.

Sklar, S.

1989-04-01T23:59:59.000Z

457

Regional aquifers and petroleum in Williston Basin region of US  

SciTech Connect (OSTI)

At least five major aquifers underlie the northern Great Plains of the US, which includes parts of the Williston basin in Montana and North Dakota. These aquifers form a hydrologic system that extends more than 960 km from recharge areas in the Rocky Mountains to discharge areas in eastern North Dakota and the Canadian Provinces of Manitoba and Saskatchewan. The regional flow system in the aquifers has had a major effect on the chemical composition of ground water within the Williston basin. Hydrodynamic forces may contribute to the accumulation of petroleum within the basin.

Downey, J.S.; Busby, J.F.; Dinwiddie, G.A.

1985-05-01T23:59:59.000Z

458

BASIN ANALYSIS AND PETROLEUM SYSTEM CHARACTERIZATION AND MODELING, INTERIOR SALT BASINS, CENTRAL AND EASTERN GULF OF MEXICO  

SciTech Connect (OSTI)

The principal research effort for Year 1 of the project is data compilation and the determination of the tectonic and depositional histories of the North Louisiana Salt Basin. In the first three (3) to six (6) months of Year 1, the research focus is on data compilation and the remainder of the year the emphasis is on the tectonic and depositional histories of the basin. No major problems have been encountered to date, and the project is on schedule. The principal objectives of the project are to develop through basin analysis and modeling the concept that petroleum systems acting in a basin can be identified through basin modeling and to demonstrate that the information and analysis resulting from characterizing and modeling of these petroleum systems in the North Louisiana Salt Basin and the Mississippi Interior Salt Basin can be used in providing a more reliable and advanced approach for targeting stratigraphic traps and specific reservoir facies within a geologic system and in providing a refined assessment of undiscovered and underdeveloped reservoirs and associated oil and gas resources.

Ernest A. Mancini

2004-02-05T23:59:59.000Z

459

BASIN ANALYSIS AND PETROLEUM SYSTEM CHARACTERIZATION AND MODELING, INTERIOR SALT BASINS, CENTRAL AND EASTERN GULF OF MEXICO  

SciTech Connect (OSTI)

The principal research effort for Year 2 of the project has been data compilation and the determination of the burial and thermal maturation histories of the North Louisiana Salt Basin and basin modeling and petroleum system identification. In the first nine (9) months of Year 2, the research focus was on the determination of the burial and thermal maturation histories, and during the remainder of the year the emphasis has basin modeling and petroleum system identification. Existing information on the North Louisiana Salt Basin has been evaluated, an electronic database has been developed, regional cross sections have been prepared, structure and isopach maps have been constructed, and burial history, thermal maturation history and hydrocarbon expulsion profiles have been prepared. Seismic data, cross sections, subsurface maps and related profiles have been used in evaluating the tectonic, depositional, burial and thermal maturation histories of the basin. Oil and gas reservoirs have been found to be associated with salt-supported anticlinal and domal features (salt pillows, turtle structures and piercement domes); with normal faulting associated with the northern basin margin and listric down-to-the-basin faults (state-line fault complex) and faulted salt features; and with combination structural and stratigraphic features (Sabine and Monroe Uplifts) and monoclinal features with lithologic variations. Petroleum reservoirs are mainly Upper Jurassic and Lower Cretaceous fluvial-deltaic sandstone facies and Lower Cretaceous and Upper Cretaceous shoreline, marine bar and shallow shelf sandstone facies. Cretaceous unconformities significantly contribute to the hydrocarbon trapping mechanism capacity in the North Louisiana Salt Basin. The chief petroleum source rock in this basin is Upper Jurassic Smackover lime mudstone beds. The generation of hydrocarbons from Smackover lime mudstone was initiated during the Early Cretaceous and continued into the Tertiary. Hydrocarbon expulsion commenced during the Early Cretaceous and continued into the Tertiary with peak expulsion occurring mainly during the Late Cretaceous.

Ernest A. Mancini; Donald A. Goddard; Ronald K. Zimmerman

2005-05-10T23:59:59.000Z

460

Basin center - fractured source rock plays within tectonically segmented foreland (back-arc) basins: Targets for future exploration  

SciTech Connect (OSTI)

Production from fractured reservoirs has long been an industry target, but interest in this type play has increased recently because of new concepts and technology, especially horizontal drilling. Early petroleum exploration programs searched for fractured reservoirs from shale, tight sandstones, carbonates, or basement in anticlinal or fault traps, without particular attention to source rocks. Foreland basins are some of the best oil-generating basins in the world because of their rich source rocks. Examples are the Persian Gulf basin, the Alberta basin and Athabasca tar sands, and the eastern Venezuela basin and Orinoco tar sands. Examples of Cretaceous producers are the wrench-faulted La Paz-Mara anticlinal fields, Maracaibo basin, Venezuela; the active Austin Chalk play in an extensional area on the north flank of the Gulf of Mexico continental margin basin; and the Niobrara Chalk and Pierre Shale plays of the central Rocky Mountains, United States. These latter plays are characteristic of a foreland basin fragmented into intermontane basins by the Laramide orogeny. The Florence field, Colorado, discovered in 1862, and the Silo field, Wyoming, discovered in 1980, are used as models for current prospecting and will be described in detail. The technologies applied to fracture-source rock plays are refined surface and subsurface mapping from new log suites, including resistivity mapping; 3D-3C seismic, gravity, and aeromagnetic mapping; borehole path seismic mapping associated with horizontal drilling; fracture mapping with the Formation MicroScanner and other logging tools; measurements while drilling and other drilling and completion techniques; surface geochemistry to locate microseeps; and local and regional lineament discrimination.

Weimer, R.J. [Colorado School of Mines, Golden, CO (United States)

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Agenda  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7/26/2012 7/26/2012 EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Monday, July 30, 2012 - LAX Marriott, Los Angeles, CA Event Objective: DOE aims to obtain stakeholder input on the consumer acceptance and charging infrastructure barriers associated with the EV Everywhere Grand Challenge. This input will help guide the Challenge and the next-generation technology development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles - and to do so within the next 10 years. 8:00-8:30AM CONTINENTAL BREAKFAST 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program

462

Microsoft Word - CX-GrandCouleeBellNo3-WestsideAgLand_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2011 , 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Insulator replacement in agricultural lands along the Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1909 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA)

463

Microsoft Word - CX-GrandCoulee-BellNo3ReconductoringFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: Grand Coulee-Bell No. 3 double circuit 230-kV transmission line reconductoring project Budget Information: Work Order #00280243 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3 Double Circuit 230-kV Transmission Line Reconductoring Project is located in Grant, Lincoln, and Spokane counties, Washington, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project listed below (Table 1).

464

Microsoft Word - CX-GrandCoulee-BellNo5InsultatorFY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacie Hensley Project Manager - TEP-TPP-4 Proposed Action: Grand Coulee-Bell No. 5 Dead End Insulator Replacement Project Budget Information: Work Order #00339638 PP&A Project No.: 2699 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Grant and Lincoln counties, Washington, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed below (Table 1). Table 1. Townships, Ranges, and Sections for the Grand Coulee-Bell No.5 Dead End Insulator Replacement Project. Township Range Sections

465

EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electric Drive (Power Electric Drive (Power Electronics and Electric Machines) Workshop Tuesday, July 24, 2012 - Doubletree O'Hare, Chicago, IL Event Objective: DOE aims to obtain stakeholder input on the Power Electronics and Electric Machines (PEEM) goals of the EV Everywhere Grand Challenge. This input will advise the aggressive next-generation technology research and development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. The EV Everywhere Grand Challenge Electric Drive (Power Electronics and Electric Machines) Workshop was attended by senior officials of the Department of Energy and representatives from the following

466

EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Agenda  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- 7/20/2012 - 7/20/2012 EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Tuesday, July 24, 2012 - Doubletree O'Hare, Chicago, IL Event Objective: DOE aims to obtain stakeholder input on the Power Electronics and Electric Machines (PEEM) goals of the EV Everywhere Grand Challenge. This input will advise the aggressive next- generation technology research and development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. 8:30-8:35 AM CONTINENTAL BREAKFAST 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program

467

U.S. Department of Energy at Grand Junction 2003 Annual Inspection⎯Monticello, Utah  

Office of Legacy Management (LM)

at Grand Junction 2003 Annual Inspection⎯Monticello, Utah at Grand Junction 2003 Annual Inspection⎯Monticello, Utah November 2003 Page 1 2003 Annual Inspection of the Monticello Mill Tailings (USDOE) and Monticello Radioactively Contaminated Properties Sites Summary The Monticello site, which includes the U.S. Department of Energy (DOE) Monticello Mill Tailings Site (MMTS) and the Monticello Radioactively Contaminated Properties site, was inspected September 23-25, 2003. A follow-up inspection of the Soil and Sediment properties was conducted on October 8, 2003. The Monticello Radioactively Contaminated Properties site is also called the Monticello Vicinity Properties (MVP) and will be referred to as MVP in this report. Restoration work at MVP is complete and is nearly complete at MMTS. MVP is in good

468

The microscopic meaning of grand potential: cluster properties of the one-dimensional lattice gas  

E-Print Network [OSTI]

We demonstrate, with a concrete example, how the combinatorial approach to a general system of particles, which was introduced in detail in the earlier paper arXiv:1205.4986, works and where it enters to provide a genuine extension of results obtainable by more traditional methods of statistical mechanics. To this end, an effort is made to study cluster properties of the one-dimensional lattice gas with nearest neighbor interactions. Three cases: the infinite temperature limit, the range of finite temperatures, and the zero temperature limit are discussed separately, yielding some new results and providing alternative proofs of known results. In particular, the closed-form expression for the grand partition function in the zero temperature limit is obtained, which results in the non-analytic behavior of the grand potential, in accordance with the Yang-Lee theory.

Agata Fronczak

2012-09-18T23:59:59.000Z

469

A simple grand canonical approach to compute the vapor pressure of bulk and finite size systems  

SciTech Connect (OSTI)

In this article we introduce a simple grand canonical screening (GCS) approach to accurately compute vapor pressures from molecular dynamics or Monte Carlo simulations. This procedure entails a screening of chemical potentials using a conventional grand canonical scheme, and therefore it is straightforward to implement for any kind of interface. The scheme is validated against data obtained from Gibbs ensemble simulations for water and argon. Then, it is applied to obtain the vapor pressure of the coarse-grained mW water model, and it is shown that the computed value is in excellent accord with the one formally deduced using statistical thermodynamics arguments. Finally, this methodology is used to calculate the vapor pressure of a water nanodroplet of 94 molecules. Interestingly, the result is in perfect agreement with the one predicted by the Kelvin equation for a homogeneous droplet of that size.

Factorovich, Matías H.; Scherlis, Damián A. [Departamento de Química Inorgánica, Analítica y Química Física/INQUIMAE, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires, Ciudad Universitaria, Pab. II, Buenos Aires C1428EHA (Argentina)] [Departamento de Química Inorgánica, Analítica y Química Física/INQUIMAE, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires, Ciudad Universitaria, Pab. II, Buenos Aires C1428EHA (Argentina); Molinero, Valeria [Department of Chemistry, University of Utah, 315 South 1400 East, Salt Lake City, Utah 84112-0850 (United States)] [Department of Chemistry, University of Utah, 315 South 1400 East, Salt Lake City, Utah 84112-0850 (United States)

2014-02-14T23:59:59.000Z

470

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

471

Lepton flavor violation at linear collider experiments in supersymmetric grand unified theories  

E-Print Network [OSTI]

Lepton flavor violation at linear collider experiments is discussed. We show that detectable lepton flavor violation could occur through scalar lepton pair production and decay in the supersymmetric SU(5) grand unified theory in spite of the stringent present experimental constraints by rare process searches. Possible cross sections about 40fb for an e+e- collider and 280fb for an e-e- collider are illustrated.

Masahide Hirouchi; Minoru Tanaka

1997-12-28T23:59:59.000Z

472

Aspects of the natural history of freshwater turtles within the lower Rio Grande Valley of Texas  

E-Print Network [OSTI]

) reported on food preferences of captives from Texas. Mahmoud (1960, 1967, 1968, 1969) studied the ecology of this species in Oklahoma. THE STUDY AREA This study was conducted during the months of June-November, 1976, in the lower Rio Grande Valley (Rio... is found from Indiana south through Alabama, western Georgia, and the Florida Panhandle to the Gulf of Mexico; west through Missouri, Kansas, Oklahoma, and Texas into eastern New Nexico and northeastern Mexico (Conant, 1975). This form was caught in all...

Grosmaire, Eric Kevin

2012-06-07T23:59:59.000Z

473

Plants of Ornamental Value for the Rio Grande Valley of Texas.  

E-Print Network [OSTI]

, Phoenix cannriensis, Cocos australis, Phoenix Roebelenii and Cycas revoluta thrive to perfection in the Lower Rio Grande Valley. The stately fan palms and the graceful Phoenix and Cocos palms may be used for avenue planting (Figure I), in group... plantings at the end of roads, or to give height to mass plantings of the more dwarf types of plants. The dwarf forms such as Cocos australis, Phoenix Roebelenii and Cycas revo- Zutn are especially useful for small group plantings. Most palms...

Friend, W. H. (William Heartsill)

1942-01-01T23:59:59.000Z

474

Alliance stratgique entre PME et Grande Firme Internationale : Quel rle pour le middle manager ?  

E-Print Network [OSTI]

1 Alliance stratégique entre PME et Grande Firme Internationale : Quel rôle pour le middle manager Globales aux Born Global Firms, PAU : France (2010)" #12;2 Alliance stratégique entre Petite et Moyenne coûts et des niveaux d'engagements différents. Ce travail propose de se focaliser sur l'alliance

Boyer, Edmond

475

Ecosystem level assessment of the Grand Calumet Lagoons, Indiana Dunes National Lakeshore  

SciTech Connect (OSTI)

The Grand Calumet Lagoons make up the eastern section of the Grand Calumet River (GCR), Indiana Harbor and Ship Canal and nearshore Lake Michigan Area of Concern (AOC). The GCR AOC is the only one of the 42 Great Lakes Areas of Concern identified by the International Joint Commission with all 14 designated uses classified as impaired. Included within the boundaries of the Indiana Dunes National Lakeshore (INDU), is the central section of the Grand Calumet Lagoons. A number of biotic and abiotic factors were tested to determine the effects of an industrial landfill that borders the lagoons to assess the potential impact on park resources. Analysis included water quality testing, assessments of macroinvertebrate, fish, algae and aquatic plant communities and contaminant concentrations in water, sediment and plant and fish tissue. Surface water testing found very few contaminants, but significantly higher nutrient levels were found in the water column closest to the landfill. Macroinvertebrate, aquatic plant and fish communities all showed significant impairment in relationship to their proximity to the landfill. Aquatic plant growth habit became limited next to the landfill with certain growth habits disappearing entirely. Aquatic plants collected close to the landfill had high concentrations of several heavy metals in their stems and shoots. Using the index of biotic integrity (IBI), fish community assessment indicated impairment in the areas adjacent to the landfill. Sediments tested at one site had over 12% polycyclic aromatic hydrocarbons (PAH) and carp (Cyprinus carpio) collected from this site had whole fish tissue concentrations over 1 mg/kg PAH.

Stewart, P.M. [National Biological Service, Porter, IN (United States)

1995-12-31T23:59:59.000Z

476

DeFrees Small Wave Basin | Open Energy Information  

Open Energy Info (EERE)

Wave Basin Wave Basin Jump to: navigation, search Basic Specifications Facility Name DeFrees Small Wave Basin Overseeing Organization Cornell University Hydrodynamics Hydrodynamic Testing Facility Type Wave Basin Length(m) 15.0 Beam(m) 0.8 Depth(m) 0.9 Water Type Freshwater Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.3 Maximum Wave Height(m) at Wave Period(s) 3.0 Maximum Wave Length(m) 30 Wave Period Range(s) 3.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Computer controlled hydraulic paddle, arbitrary wave shape possible Wave Direction Uni-Directional Simulated Beach Yes Description of Beach 1:10 sloping glass with dissipative horsehair covering if needed

477

Geographic Information System At Northern Basin & Range Region (Coolbaugh,  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Geographic Information System At Northern Basin & Range Region (Coolbaugh, Et Al., 2005 - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Northern Basin & Range Region (Coolbaugh, Et Al., 2005 - 2) Exploration Activity Details Location Northern Basin and Range Geothermal Region Exploration Technique Geographic Information System Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown References Mark Coolbaugh, Richard Zehner, Corne Kreemer, David Blackwell, Gary Oppliger (2005) A Map Of Geothermal Potential For The Great Basin, Usa-

478

Exploration and Development Techniques for Basin and Range Geothermal  

Open Energy Info (EERE)

Techniques for Basin and Range Geothermal Techniques for Basin and Range Geothermal Systems: Examples from Dixie Valley, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Exploration and Development Techniques for Basin and Range Geothermal Systems: Examples from Dixie Valley, Nevada Abstract Abstract unavailable. Authors David D. Blackwell, Mark Leidig, Richard P. Smith, Stuart D. Johnson and Kenneth W. Wisian Conference GRC Annual Meeting; Reno, NV; 2002/09/22 Published Geothermal Resources Council, 2002 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Exploration and Development Techniques for Basin and Range Geothermal Systems: Examples from Dixie Valley, Nevada Citation David D. Blackwell,Mark Leidig,Richard P. Smith,Stuart D. Johnson,Kenneth

479

Contemporary Tectonic Deformation of the Basin and Range Province, Western  

Open Energy Info (EERE)

Contemporary Tectonic Deformation of the Basin and Range Province, Western Contemporary Tectonic Deformation of the Basin and Range Province, Western United States: 10 Years of Observation with the Global Positioning System Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Contemporary Tectonic Deformation of the Basin and Range Province, Western United States: 10 Years of Observation with the Global Positioning System Abstract [1] We have estimated patterns and rates of crustal movement across 800 km of the Basin and Range at ∼39° north latitude with Global Positioning System surveys in 1992, 1996, 1998, and 2002. The total rate of motion tangent to the small circle around the Pacific-North America pole of rotation is 10.4 ± 1.0 mm/yr, and motion normal to this small circle is 3.9 ± 0.9 mm/yr compared to the east end of our network. On the Colorado

480

Atlantic Basin Refining Dynamics from U.S. Perspective  

Gasoline and Diesel Fuel Update (EIA)

“This presentation focuses on the current refining situation in the Atlantic Basin, “This presentation focuses on the current refining situation in the Atlantic Basin, Page 1 including some discussion on how we got here, and on drivers that will influence the next 5 years. I will focus on three topics today that are critical to the petroleum product dynamics of Page 2 the Atlantic Basin over the next several years. The first is product demand growth - something that has been affected both by the recession and legislation. Next I will cover the supply situation for gasoline and distillates in the Atlantic Basin, since Europe and the U.S. are closely entwined in these markets. Last, we will visit the outlook for those drivers affecting profitability - an area of large uncertainty. I will begin today with a short discussion of important underlying long-term trends in U.S.

Note: This page contains sample records for the topic "grande ronde basin" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Magnetotellurics At Northern Basin & Range Region (Pritchett, 2004) | Open  

Open Energy Info (EERE)

Magnetotellurics At Northern Basin & Range Region Magnetotellurics At Northern Basin & Range Region (Pritchett, 2004) Exploration Activity Details Location Northern Basin and Range Geothermal Region Exploration Technique Magnetotellurics Activity Date Usefulness useful DOE-funding Unknown Notes NOTE: These are theoretical/computer simulation tests of various methods on eight hypothetical 'model' basing-and-range geothermal systems. "The 300-meter heat flow holes are essentially useless for finding the "hidden" reservoirs. Clearly, the best results are obtained from the SP and MT surveys, with DC resistivity a close third. It is concluded that the best way to find "hidden" basin and range geothermal resources of this general type is to carry out simultaneous SP and low-frequency MT surveys, and then