Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.  

DOE Green Energy (OSTI)

This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

Merker, Christopher

1993-04-01T23:59:59.000Z

2

Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.  

DOE Green Energy (OSTI)

The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

Ashley, Paul

1992-06-01T23:59:59.000Z

3

Study of the effects of a disaster at Grand Coulee Dam upon the Hanford Works  

SciTech Connect

Declassified 23 Nov 1973. It is assumed that the Grand Coulee Dam would be destroyed by one direct hit following detonation of an atomic bomb. Major effects of the explosion include flooding and isolation of Richland, flooding of Midway Substation, and flooding of surrounding areas. Maximum water elevations following a direct hit and indirect hits are estimated. Data are presented for flow through openings and flow through dam failure. (HLW)

Kramer, H.A.

1950-02-01T23:59:59.000Z

4

Habitat Evaluation Procedures (HEP) Report : Grand Coulee Dam Mitigation, 1996-1999 Technical Report.  

DOE Green Energy (OSTI)

The purpose of this Habitat Evaluation Procedures (HEP) study was to determine baseline habitat units and to estimate future habitat units for Bonneville Power Administration (BPA) mitigation projects on the Spokane Indian Reservation. The mitigation between BPA and the Spokane Tribe of Indians (STOI) is for wildlife habitat losses on account of the construction of Grand Coulee Dam. Analysis of the HEP survey data will assist in mitigation crediting and appropriate management of the mitigation lands.

Kieffer, B.; Singer, Kelly; Abrahamson, Twa-le

1999-07-01T23:59:59.000Z

5

Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

DOE Green Energy (OSTI)

This report documents the fourth year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

Johnson, Robert L.; Simmons, Mary Ann; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

2005-02-25T23:59:59.000Z

6

Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

SciTech Connect

This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

2004-01-01T23:59:59.000Z

7

Microsoft Word - GrandCoulee_FONSI.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project BPA's Finding of No Significant Impact 1 Bonneville Power Administration's Finding of No Significant Impact (FONSI) for the Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project DOE/EA-1679 SUMMARY The Bonneville Power Administration (BPA) announces its environmental findings on the Bureau of Reclamation's (Reclamation) Grand Coulee Third Powerplant 500-kV Transmission Line Replacement Project. This project involves replacing the six 500-kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile west of the TPP. BPA would design and construct

8

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.  

DOE Green Energy (OSTI)

The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.

Crossley, Brian (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA); Lockwood, Jr., Neil W. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA)

2001-01-01T23:59:59.000Z

9

Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.  

SciTech Connect

The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

Creveling, Jennifer

1986-08-01T23:59:59.000Z

10

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2006-02-01T23:59:59.000Z

11

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

2003-09-01T23:59:59.000Z

12

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2005-11-01T23:59:59.000Z

13

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O'Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

2003-01-01T23:59:59.000Z

14

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's...

15

Chief Joseph Kokanee Enhancement Project; Characterization of Pump Flow at the Grand Coulee Dam Pumping Station for Fish Passage, 2004-2005 Final Report.  

DOE Green Energy (OSTI)

This report describes a study conducted by Pacific Northwest National Laboratory (PNNL) for the Bonneville Power Administration to characterize the conditions fish experience when entrained in pump flow at the Grand Coulee Dam. PNNL conducted field studies at Grand Coulee Dam in 2004 using the Sensor Fish to measure the acceleration and pressure conditions that might be experienced by fish that pass through pumps at Grand Coulee Dam's Pump-Generating Plant and are transported up into the feeder canal leading to Banks Lake. The probability that fish would be struck by the Pump-Generating Plant's new nine-bladed turbines was also estimated. Our measurements showed relatively low turbulence except in the immediate vicinity of the runner environment. The lowest and highest pressures experienced by the Sensor Fish were 6.4 and 155 psi (the pressure gauge saturated at 155 psi). The probability of strike was also calculated, based on the average length of hatchery-reared juvenile kokanee (land-locked sockeye). Strike probabilities ranged from 0.0755 for 2.36-inch fish to 0.3890 for 11.8-inch fish. The probability of strike estimates indicate that the majority (77%) of recently released hatchery kokanee would be carried through the test pump without being struck and most likely with low risk of injury resulting from pressure and turbulence exposure. Of the 23% that might be struck it is expected that 60% would arrive in Banks Lake without visible external injuries. Thus more than 90% of entrained fish could be expected to arrive in Banks Lake without significant injury, assuming that no kokanee were injured or killed by pressure exposure during passage.

Carlson, T.; Duncan, J.; Johnson, R.

2005-03-01T23:59:59.000Z

16

Factors affecting the failure of copper connectors brazed to copper bus bar segments on a 615-MVA hydroelectric generator at Grand Coulee Dam  

DOE Green Energy (OSTI)

On March 21, 1986, the United States Bureau of Reclamation experienced a ground fault in the main parallel ring assembly of Unit G19 - a 615-MVA hydroelectric generator - at Grand Coulee Dam, Washington. Inspection of the unit revealed that the ground fault had been induced by fracture of one or more of the copper connectors used to join adjacent segments of one of the bus bars in the north half of the assembly. Various experimental techniques were used to detect and determine the presence of cracks, crack morphology, corrosion products, and material microstructure and/or embrittlement. The results of these inspections and recommendations are given. 7 refs., 27 figs.

Atteridge, D.G.; Klein, R.F.; Layne, R.; Anderson, W.E.; Correy, T.B.

1988-01-01T23:59:59.000Z

17

Chief Joseph Kokanee Enhancement Project -- Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

DOE Green Energy (OSTI)

This report describes the work conducted during the first year of a long-term study to assess the efficacy of a prototype strobe light system in eliciting a negative phototactic response in kokanee and rainbow trout. The strobe light system is being evaluated as a means to prevent entrainment (and subsequent loss) of fish at the entrance to the forebay adjacent to the third powerplant at Grand Coulee Dam. Pacific Northwest National Laboratory and the Colville Confederated Tribes are collaborating on the three-year study being conducted for the Bonneville Power Administration and the Northwest Power Planning Council.

Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Anglea, Steven M.; Simmons, Carver S.; Thorsten, Susan L.; Lecaire, R; Francis, S

2002-01-29T23:59:59.000Z

18

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

19

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven-transducer splitbeam hydroacoustic system was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. Two of the seven transducers were mounted to the frame containing the strobe lights and were oriented horizontally. The remaining five transducers were spaced approximately 4 m apart on individual floating frames upstream of the barge, with the transducers looking vertically downward.

Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

2003-01-01T23:59:59.000Z

20

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly within a 3-day block throughout the study period. Hydroacoustic technology was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The hydroacoustic system in 2003 comprised seven splitbeam transducers arrayed in front of the strobe lights, two multibeam transducers behind the lights, and a mobile splitbeam system. The seven splitbeam transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. These transducers were spaced approximately 4 m apart on an aluminum frame floating upstream of the barge and looked vertically downward. The multibeam transducers monitored the distribution of fish directly behind and to both sides of the lights, while the mobile splitbeam system looked at the distribution of fish within the third powerplant forebay. To augment the hydroacoustic data, additional studies were conducted. The hydrodynamic characteristics of the third powerplant forebay were measured, and acoustically tagged juvenile kokanee were released upstream of the strobe lights and tracked within the forebay and downstream of the dam. Analysis of the effect of strobe lights on kokanee and rainbow trout focused on the number of fish detected in each of the areas covered by one of the downlooking transducers, the timing of fish arrivals after the status of the strobe lights changed, fish swimming effort (detected velocity minus flow velocity), and fish swimming direction. Water velocity measurements were used to determine fish swimming effort. The tracking of tagged kokanee provided data on fish movements into and out of the third powerplant forebay, including entrainment.

Simmons, M.; McKinstry, C.; Cook, C.

2004-01-01T23:59:59.000Z

22

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay, 2005-2006 Annual Report.  

Science Conference Proceedings (OSTI)

The construction of Grand Coulee and Chief Joseph dams on the Columbia River resulted in the complete extirpation of the anadromous fishery upstream of these structures. Today, this area is totally dependent upon resident fish resources to support local fisheries. The resident fishing is enhanced by an extensive stocking program for target species in the existing fishery, including kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss). The kokanee fishery in Lake Roosevelt has not been meeting the return goals set by fisheries managers despite the stocking program. Investigations of physical and biological factors that could affect the kokanee population found predation and entrainment had a significant impact on the fish population. In 1999 and 2000, walleye (Sander vitreum) consumed between 15% and 9%, respectively, of the hatchery kokanee within 41 days of their release, while results from a study in the late 1990s estimated that entrainment at Grand Coulee Dam could account for up to 30% of the total mortality of the stocked fish. To address the entrainment loss, the Bonneville Power Administration commissioned a study to determine if fish would avoid areas illuminated by strobe lights in the forebay of the third powerplant. This work was conducted by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). From 2002 through 2004, six strobe lights were suspended in the center of the opening to the third powerplant forebay during summer months. Results from those studies indicated that fish appeared to be attracted to the illuminated area but only at night and when flow conditions within the third powerplant forebay were minimal. However, small but consistent results from these studies indicated that under high flow conditions, fish might be avoiding the lights. The 2005 study was designed to examine whether, under high flow conditions near the penstock openings, fish would avoid the lighted regions. Four omnidirectional strobe lights were deployed on the one trash rack directly in front of one turbine penstock. Seven splitbeam transducers were deployed to monitor fish approaching three penstock openings either from in front of the trash racks or moving down the dam behind the trash racks. Four key results emerged from the 2005 study. The results provide insight into the current level of entrainment and how fish respond to strobe lights under high flow conditions. First, very few fish were detected inside the trash racks. Of the more than 3,200 targets identified by the data processing, less than 100 were detected inside the trash racks. Only 23 fish were found inside the trash racks behind the strobe lights. Of those 21 fish, 13 were detected when the lights were on. Most of the fish detected behind the trash racks were above the turbine penstock but were headed downward. No fish were detected at night when minimal flows occurred between midnight and 4:00 a.m. Second, significantly more fish (P number of detections by the transducers aimed away from the lights. Third, fish clearly manifested a behavioral response to the strobe lights during the day. When the lights were on, fish detected by three of the four transducers generally were swimming north, parallel to the face of the dam. Howeve

Simmons, M.; Johnson, Robert; McKinstry, C. [Pacific Northwest National Laboratory

2006-03-01T23:59:59.000Z

23

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

NLE Websites -- All DOE Office Websites (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

24

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay, 2005-2006 Annual Report.  

DOE Green Energy (OSTI)

The construction of Grand Coulee and Chief Joseph dams on the Columbia River resulted in the complete extirpation of the anadromous fishery upstream of these structures. Today, this area is totally dependent upon resident fish resources to support local fisheries. The resident fishing is enhanced by an extensive stocking program for target species in the existing fishery, including kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss). The kokanee fishery in Lake Roosevelt has not been meeting the return goals set by fisheries managers despite the stocking program. Investigations of physical and biological factors that could affect the kokanee population found predation and entrainment had a significant impact on the fish population. In 1999 and 2000, walleye (Sander vitreum) consumed between 15% and 9%, respectively, of the hatchery kokanee within 41 days of their release, while results from a study in the late 1990s estimated that entrainment at Grand Coulee Dam could account for up to 30% of the total mortality of the stocked fish. To address the entrainment loss, the Bonneville Power Administration commissioned a study to determine if fish would avoid areas illuminated by strobe lights in the forebay of the third powerplant. This work was conducted by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). From 2002 through 2004, six strobe lights were suspended in the center of the opening to the third powerplant forebay during summer months. Results from those studies indicated that fish appeared to be attracted to the illuminated area but only at night and when flow conditions within the third powerplant forebay were minimal. However, small but consistent results from these studies indicated that under high flow conditions, fish might be avoiding the lights. The 2005 study was designed to examine whether, under high flow conditions near the penstock openings, fish would avoid the lighted regions. Four omnidirectional strobe lights were deployed on the one trash rack directly in front of one turbine penstock. Seven splitbeam transducers were deployed to monitor fish approaching three penstock openings either from in front of the trash racks or moving down the dam behind the trash racks. Four key results emerged from the 2005 study. The results provide insight into the current level of entrainment and how fish respond to strobe lights under high flow conditions. First, very few fish were detected inside the trash racks. Of the more than 3,200 targets identified by the data processing, less than 100 were detected inside the trash racks. Only 23 fish were found inside the trash racks behind the strobe lights. Of those 21 fish, 13 were detected when the lights were on. Most of the fish detected behind the trash racks were above the turbine penstock but were headed downward. No fish were detected at night when minimal flows occurred between midnight and 4:00 a.m. Second, significantly more fish (P < 0.001) were detected in front of the trash racks when the lights were on at night. On a count-per-hour basis, the difference between lights off and lights on was apparent in the early morning hours at depths between 25 m and 50 m from the transducers. The lights were approximately 34 m below the splitbeam transducers, and fish detected at night with lights on were found at a median depth of approximately 35 m, compared to a median depth of from 20.6 to 23.5 m when the lights were off. The differences in depth between lights on and off at night were also significant (P < 0.001). Additionally, the increase in fish occurred only in front of the trash rack where the strobe lights were mounted; there was no increase in the number of detections by the transducers aimed away from the lights. Third, fish clearly manifested a behavioral response to the strobe lights during the day. When the lights were on, fish detected by three of the four transducers generally were swimming north, parallel to the face of the dam. Howeve

Simmons, M.; Johnson, Robert; McKinstry, C. [Pacific Northwest National Laboratory

2006-03-01T23:59:59.000Z

25

Microsoft Word - GrandCoulee_FinalEA_CommentResponses.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1679 December 2011 Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Revision Sheet for the Environmental Assessment 2 SUMMARY This revision sheet documents the changes to be incorporated into the Grand Coulee's Third Powerplant 500-kilovolt (kV) Transmission Line Replacement Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On May 2, 2011, the Preliminary EA was sent to agencies and interested parties.

26

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

27

Microsoft Word - CX-GrandCoulee-Creston_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Robert Keudell Robert Zeller Lineman Foreman III - TFWK-Grand Coulee Lineman Foreman I - TFWK-Grand Coulee Proposed Action: Selected wood pole replacement and minor access road maintenance along the Grand Coulee-Creston transmission line at miles 14, 15, 21 and 28. PP&A Project No: 1828 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures... in a condition suitable for a facility to be used for its designed purpose.

28

Characterization of Pump Flow at the Grand Coulee Pumping Station for Fish Passage, 2004  

DOE Green Energy (OSTI)

This report describes a study conducted by PNNL for the Bonneville Power Administration to characterized the conditions fish experience when entrained in pump flow at the Grand Coulee Dam. PNNL used the Sensor Fish to measure the acceleration and pressure conditions that might be experienced by fish who are pulled through the pumps and turbines at Grand Coulee Dam's pump generation station and transported up into the feeder canal leading to Banks Lake. The probability that fish would be struck by the pump generating plant's new 9-bladed turbines was also calculated using Monte Carlo simulations. Our measurements showed relatively low turbulence except in the immediate vicinity of the runner environment. The highest pressure experienced by the Sensor Fish was estimated at 157 psi (the pressure gauge saturated at 155 psi). The probability of strike was also calculated, based on the average length of hatchery-reared juvenile kokanee (land-locked sockeye). Strike probabilities ranged from 0.755 for 2.36-inch fish to 0.3890 for 11.8-inch fish. The probability of strike estimates indicate that the majority (77%) of kokanne would be carried through the pump without being struck and most likely without injury resulting from pressure and turbulence exposure. Of the 23% that might be struck it is expected that 60% would arrive in Banks Lake without visible external injuries. Thus more than 90% of entrained fish would be expected to arrive in Banks Lake without injury.

Carlson, Thomas J.; Duncan, Joanne P.; Johnson, Robert L.

2005-03-31T23:59:59.000Z

29

Microsoft Word - CX-GrandCoulee-Bell3WestsideInsulatorRepAccessImprov_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Kjelland Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line insulator replacement and access improvement project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit

30

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

31

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

32

Microsoft Word - CX-GrandCoulee-OkanoganWP-AR-Landing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Jim Semrau Robert Keudell Road Engineer - TELF-TPP-3 Line Foreman III - TFWK-Grand Coulee Todd Wehner Robert Zellar Road Engineer - TELF-TPP-3 Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along the Grand Coulee-Okanogan #2 115-kV transmission line right-of-way (ROW). PP&A Project No: 1776 Work Order No.: 275584 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

33

Microsoft Word - CX-GrandCoulee-ChiefJoseph_ARandWood Poles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Todd Wehner Road Engineer - TELF-TPP-3 Robert Keudell Line Foreman III - TFWK-Grand Coulee Robert Zellar Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along portions of the Grand Coulee-Chief Joseph #1 and #2 230-kV transmission line rights-of-way. PP&A Project No: 1777 Work Order No.: 275582 and 275583 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

34

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

35

Microsoft Word - CX-GrandCouleeBellNo3-WestsideAgLand_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Insulator replacement in agricultural lands along the Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1909 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA)

36

Microsoft Word - CX-GrandCoulee-BellNo3ReconductoringFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: Grand Coulee-Bell No. 3 double circuit 230-kV transmission line reconductoring project Budget Information: Work Order #00280243 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3 Double Circuit 230-kV Transmission Line Reconductoring Project is located in Grant, Lincoln, and Spokane counties, Washington, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project listed below (Table 1).

37

Microsoft Word - CX-GrandCoulee-BellNo5InsultatorFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacie Hensley Project Manager - TEP-TPP-4 Proposed Action: Grand Coulee-Bell No. 5 Dead End Insulator Replacement Project Budget Information: Work Order #00339638 PP&A Project No.: 2699 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Grant and Lincoln counties, Washington, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed below (Table 1). Table 1. Townships, Ranges, and Sections for the Grand Coulee-Bell No.5 Dead End Insulator Replacement Project. Township Range Sections

38

Microsoft Word - CX-Olympia-GrandCoulee85-5RelocationFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Amanda Williams Project Manager - TEP-TPP-1 Proposed Action: Olympia-Grand Coulee Structure 85/5 Relocation Project Budget Information: Work Order #00291628 PP&A Project No.: PP&A 1984 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Olympia-Grand Coulee Structure 85/5 Relocation Project is located in King County, Washington, within the Mt. Baker-Snoqualmie National Forest (MBS), in BPA's Covington Operations and Maintenance District. Township, Range, and Section crossed by the proposed project are listed below:

39

Chief Joseph Kokanee Enhancement Project : Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grond Coulee Dam Third Powerplant Forebay.  

SciTech Connect

Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC's Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the first year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory (PNNL). The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. Analysis of the effect of strobe lights on the distribution (numbers) and behavior of kokanee and rainbow trout was based on 51, 683 fish targets detected during the study period (June 30 through August 1, 2001). Study findings include the following: (1) Analysis of the count data indicated that significantly more fish were present when the lights were on compared to off. This was true for both the 24-hr tests as well as the 1-hr tests. Powerplant discharge, distance from lights, and date were significant factors in the analysis. (2) Behavioral results indicated that fish within 14 m of the lights were trying to avoid the lights by swimming across the lighted region or upstream. Fish were also swimming faster and straighter when the lights were on compared to off. (3) The behavioral results were most pronounced for medium- and large-sized fish at night. Medium-sized fish, based on acoustic target strength, were similar to the size of kokanee and rainbow trout released upstream of Grand Coulee Dam. Based on this study and general review of strobe lights, the researchers recommend several modifications and enhancements to the follow-on study in 2002. The recommendations include: (1) modifying the study design to include only the 24-hr on/off treatments, and controlling the discharge at the third powerplant, so it can be included as a design variable; and (2) providing additional data by beginning the study earlier (mid-May) to better capture the kokanee population, deploying an additional splitbeam transducer to sample the region close to the lights, and increasing the number of lights to provide better definition of the lit and unlit region.

Simmons, M.A.; McKinstry, C.A.; Simmons, C.S.

2002-01-01T23:59:59.000Z

40

"1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation",7079  

U.S. Energy Information Administration (EIA) Indexed Site

Washington" Washington" "1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation",7079 "2. Chief Joseph","Hydroelectric","USCE-North Pacific Division",2456 "3. Transalta Centralia Generation","Coal","TransAlta Centralia Gen LLC",1596 "4. Rocky Reach","Hydroelectric","PUD No 1 of Chelan County",1254 "5. Columbia Generating Station","Nuclear","Energy Northwest",1097 "6. Wanapum","Hydroelectric","PUD No 2 of Grant County",1059 "7. Boundary","Hydroelectric","Seattle City of",1040 "8. Priest Rapids","Hydroelectric","PUD No 2 of Grant County",932

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Grand River Dam Authority | Open Energy Information  

Open Energy Info (EERE)

Dam Authority Dam Authority Jump to: navigation, search Name Grand River Dam Authority Place Oklahoma Utility Id 7490 Utility Location Yes Ownership S NERC Location SPP NERC SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png general service Commercial general service commercial Commercial large general servic time of use distributional Commercial

42

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Grand Coulee-Creston  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Grand Coulee-Creston Transmission Line Rebuild Project Draft Environmental Assessment December 2013 DOE/EA-1950 Grand Coulee-Creston Transmission Line Rebuild Project Draft Environmental Assessment December 2013 DOE/EA-1950 This page left intentionally blank. Grand Coulee-Creston Transmission Line Rebuild Project i

43

(DOE/EIS-0285/SA-99): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Olympia-Grand Coulee No.1 8/29/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-99-Olympia-Grand Coulee No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Olympia-Grand Coulee No. 1, 287 kV transmission line from structure 53/4 through structure 64/1. Corridor width is 125 feet. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 163 acres will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded

44

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

45

"1. Grand Coulee","Hydroelectric","U S Bureau of Reclamation...  

U.S. Energy Information Administration (EIA) Indexed Site

of Reclamation",7079 "2. Palo Verde","Nuclear","Arizona Public Service Co",3937 "3. Martin","Gas","Florida Power & Light Co",3695 "4. W A Parish","Coal","NRG Texas Power...

46

Washington - State Energy Profile Overview - U.S. Energy ...  

U.S. Energy Information Administration (EIA)

The Grand Coulee Dam on Washington's Columbia River is the largest hydroelectric power producer ... Washington ranked sixth in the Nation in net generation of ...

47

Washington Profile - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Washington Quick Facts. The Grand Coulee Dam on Washington's Columbia River is the largest hydroelectric power producer in the United States, with a total generating ...

48

Coulee Region Bio Fuels LLC | Open Energy Information  

Open Energy Info (EERE)

Region Bio Fuels LLC Region Bio Fuels LLC Jump to: navigation, search Name Coulee Region Bio-Fuels LLC Place Ettrick, Wisconsin Zip 54627 Sector Biofuels Product LLC created by PrairieFire BioFuels Coop, INOV8, and Arcade Pumping to distribute waste vegetable oil vehicle fuel in Wisconsin. Coordinates 44.16944°, -91.268549° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.16944,"lon":-91.268549,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

49

Dam Safety Program (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

The Dam Safety Division within the Department of the Environment is responsible for administering a dam safety program to regulate the construction, operation, and maintenance of dams to prevent...

50

Dam Safety (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

The Pennsylvania Department of Environmental Protection's Division of Dam Safety provides for the regulation and safety of dams and reservoirs throughout the Commonwealth in order to protect the...

51

INTERNATIONAL COMMISSION ON LARGE DAMS  

E-Print Network (OSTI)

earthquake. The dam was designed as a concrete gravity dam constructed using roller-compacted concrete (RCC a week. The Olivenhain Dam is the first RCC gravity dam permitted by the state of California and), is the tallest RCC dam in the North America. The Olivenhain Dam has the typical geometry for concrete gravity

Bowles, David S.

52

Dams Fishways (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

No permanent dam or obstruction may be placed in the waters of the state without providing for fish passage.

53

RETURN TO THE RIVER -2000 Chapter 6 Hydroelectric System Development187  

E-Print Network (OSTI)

MIGRATION "Dam construction presents a serious threat to the continued expansion - and indeed the very River in 1967. Later (1955), Chief Joseph Dam was constructed downstream of Grand Coulee Dam 1993). The Hanford Reach, the one remaining undammed portion of the river, was debatable as a potential

54

EA-1679: Preliminary Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulees Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

55

Dam Safety Program (Florida)  

Energy.gov (U.S. Department of Energy (DOE))

Dam safety in Florida is a shared responsibility among the Florida Department of Environmental Protection (FDEP), the regional water management districts, the United States Army Corps of Engineers ...

56

Dam Safety Standards (New Jersey)  

Energy.gov (U.S. Department of Energy (DOE))

These rules set forth procedures for application to construct, repair or modify a dam and set standards for design and maintenance of dams. These rules also establish a dam inspection procedure....

57

Dam Safety (Michigan)  

Energy.gov (U.S. Department of Energy (DOE))

This rule requires that anyone who desires to construct a dam that is 6 feet or more in height and impounds 5 surface acres or more at the design flood elevation, must first obtain a permit from...

58

Regulation of Dams (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

The owner of a dam is required to maintain the structure in good condition, and notify the Department of Environmental Management upon the sale or transfer of ownership of the structure. The...

59

Dam Safety (North Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

North Carolina Administrative Code Title 15A, Subchapter 2K lays out further regulations for the design, approval, construction, maintenance, and inspection of dams to ensure public safety and...

60

Grand Unified Theory  

NLE Websites -- All DOE Office Websites (Extended Search)

Grand Unified Theory Ungelste Rtsel Grand Unified Theory Heute besteht eines der Hauptziele der Teilchenphysik darin, die verschiedenen fundamentalen Krfte in einer Grossen...

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Flood Protection and Dam Safety (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

All dams in Virginia are subject to the Dam Safety Act and Dam Safety Regulations unless specifically excluded. A dam is excluded if it: (a) is less than six feet high; (b) has a maximum capacity...

62

MERLIN Analysis of Leesville Dam  

Science Conference Proceedings (OSTI)

Three sections of American Electric Power's (AEP's) Leesville Dam were analyzed with MERLIN, EPRI's fracture mechanics program. The Leesville Dam had previously been found to be unstable under probable maximum flood (PMF) loadings when analyzed using traditional gravity methods.

2000-06-27T23:59:59.000Z

63

Glen Canyon Dam Long-Term Experimental and Management Plan EIS  

NLE Websites -- All DOE Office Websites (Extended Search)

Glen Canyon LTEMP EIS Glen Canyon LTEMP EIS Glen Canyon Dam, a 1,300-MW water-storage and hydroelectric facility is located on the Colorado River upstream of the Grand Canyon. EVS is evaluating the effects of dam operations on the Colorado River. A comprehensive evaluation of Glen Canyon Dam operations and their effects on the Colorado River through the Grand Canyon is being conducted by the Department of the Interior with EVS assistance. The Long-Term Experimental and Management Plan (LTEMP) Environmental Impact Statement (EIS) - the first such evaluation in over 15 years - will examine flow regimes to meet the goals of supplying water for communities, agriculture, and industry and will protect the resources of the Grand Canyon, while providing clean hydropower. The LTEMP EIS, which is expected to be completed by the end of 2013, will

64

Development of dam safety management system  

Science Conference Proceedings (OSTI)

Recently, we can see an increasing amount of dam damage or failure due to aging, earthquakes occurrence and unusual changes in weather. For this reason, dam safety is gaining more importance than ever before in terms of disaster management at a national ... Keywords: Dam safety, Dam safety issue, Dam safety management system, Field inspection, Instrumentation, Monitoring, Safety evaluation

Jesung Jeon; Jongwook Lee; Donghoon Shin; Hangyu Park

2009-08-01T23:59:59.000Z

65

Regulations and Permits Related to Dams (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

66

Dams, Dikes, and Other Devices; Dam Safety Program (North Dakota) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dikes, and Other Devices; Dam Safety Program (North Dakota) Dikes, and Other Devices; Dam Safety Program (North Dakota) Dams, Dikes, and Other Devices; Dam Safety Program (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State North Dakota Program Type Siting and Permitting These regulations govern the permitting, construction, operation, inspection, and hazard classifications of dams, dikes, and other water

67

Safety of Dams and Reservoirs Act (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

This act regulates dams and associated reservoirs to protect health and public safety and minimize adverse consequences associated with potential dam failure. The act describes the responsibilities...

68

COMMISSION INTERNATIONALE DES GRANDS BARRAGES  

E-Print Network (OSTI)

of the dam (for example, concrete gravity section, main embankment or saddle embankment); · The estimateEstimating Overall Risk of Dam Failure: Practical Considerations in Combining Failure Probabilities ANCOLD 2003 Risk Workshop Page 1 ESTIMATING OVERALL RISK OF DAM FAILURE: PRACTICAL CONSIDERATIONS

Cirpka, Olaf Arie

69

These long-standing issues have been debated in various processes. The  

E-Print Network (OSTI)

unprofitable to serve. This low-cost power helped to shape the economy and advance the growth of the region tributaries and one non-federal nuclear power plant. Bonneville provides about half the elec- tricity used draft policy, ince its creation in 1937 to market the power from the Bonneville and Grand Coulee dams

70

Energy Matters in Washington State Page 1 Energy Matters  

E-Print Network (OSTI)

Energy Matters in Washington State ­ Page 1 Energy Matters in Washington State June 2008 Updated November 2009 Updated and Revised October 2013 Grand Coulee Dam #12;Energy Matters in Washington State ­ Page 2 Copyright © 2013 Washington State University Energy Program. 905 Plum Street SE, P.O. Box 43169

Collins, Gary S.

71

Use, Maintenance, Removal, Inspections, and Safety of Dams (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This section describes operating plans for dams with movable structures, as well as procedures for raising or lowering of impoundment levels, dam removal, and dam safety inspections.

72

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network (OSTI)

Retirement of Dams and Hydroelectric Facilities. ASCE, Newon the Allier River, a hydroelectric plant in France. Thethe dam generating hydroelectric power versus the ecological

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

73

EMSL: Science: Biogeochemistry Grand Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

Biogeochemistry Grand Challenge Shewanella oneidensis MR-1 growing on a hematite surface Shewanella oneidensis MR-1 growing on a hematite surface. A Grand Challenge in...

74

Dam Safety Regulation (Mississippi) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dam Safety Regulation (Mississippi) Dam Safety Regulation (Mississippi) Dam Safety Regulation (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Transportation Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Mississippi Program Type Environmental Regulations Siting and Permitting Provider Mississippi Department of Environmental Quality The purpose of the Dam Safety Regulation is to ensure that all dams constructed in the state of Mississippi are permitted and thus do not potentially harm wildlife, water supplies and property. Any person or entity proposing to construct, enlarge, repair, or alter a dam or reservoir

75

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 17740 of 26,764 results. 31 - 17740 of 26,764 results. Page EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. http://energy.gov/nepa/ea-1679-grand-coulees-third-powerplant-500-kv-transmission-line-replacement-project-grant-and Download CX-001732: Categorical Exclusion Determination

76

Seismic fracture analysis of concrete gravity dams including dam-reservoir interaction  

Science Conference Proceedings (OSTI)

In this study, the seismic fracture response of concrete gravity dams is investigated with considering the effects of dam-reservoir interaction. A co-axial rotating crack model (CRCM), which includes the strain softening behavior, is selected for concrete ... Keywords: Concrete gravity dam, Dam-reservoir interaction, Non-linear analysis, Seismic fracture

Yusuf Calayir; Muhammet Karaton

2005-07-01T23:59:59.000Z

77

Dam Safety (Delaware) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dam Safety (Delaware) Dam Safety (Delaware) Dam Safety (Delaware) < Back Eligibility Construction Fed. Government Investor-Owned Utility Local Government Municipal/Public Utility State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info Start Date 2004 State Delaware Program Type Safety and Operational Guidelines Provider Delaware Department of Natural Resources and Environmental Control The Delaware Dam Safety Law was adopted in 2004 and provides the framework for proper design, construction, operation, maintenance, and inspection of dams in the interest of public health, safety, and welfare. The law requires licensing, inspections and preparation of emergency action plans (EAPs) for publicly owned dams with a high or significant hazard potential.

78

Power Plant Dams (Kansas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Plant Dams (Kansas) Power Plant Dams (Kansas) Power Plant Dams (Kansas) < Back Eligibility Commercial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Water Buying & Making Electricity Program Info State Kansas Program Type Environmental Regulations Provider Health and Environment This act states the provisions for erection and maintenance of dams. When any person, corporation or city may be desirous of erecting and maintaining a milldam or dam for generating power across any watercourse, the party so desiring to do the same may run the stream over the land of any other person by ditching or otherwise, and he, she or it may obtain the right to erect and maintain said dam and keep up and maintain the necessary ditches

79

Dam Safety Program (Florida) | Open Energy Information  

Open Energy Info (EERE)

Summary Dam safety in Florida is a shared responsibility among the Florida Department of Environmental Protection (FDEP), the regional water management districts, the United...

80

Destruction or Alteration of a Dam (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Permission from the Environmental Protection Commission is required prior to the removal, destruction, or alteration that results in a lower water level of any existing dam.

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

McNary Dam, Ice Harbor Dam, and Lower Monumental Dam Smolt Monitoring Program; 1996 Annual Report.  

DOE Green Energy (OSTI)

The Washington Department of Fish & Wildlife (WDFW) assumed responsibility for the Smolt Monitoring Program at McNary Dam on the Columbia River in 1990 and at the new juvenile collection facility at Lower Monumental Dam on the Snake River in 1993. In 1996, Smolt Monitoring Program activities also began at the new juvenile collection facility located at Ice Harbor Dam. This report summarizes the 1996 Smolt Monitoring work at all three sites. The work at Ice Harbor consisted of Gas Bubble Trauma (GBT) monitoring only. In general, the 1996 passage season at both the McNary and Lower Monumental sites can be characterized by reduced passage of juveniles through the collection systems due to elevated river flows and spill, and low (<1%) overall facility mortality rates most likely resulting from cooler water temperatures. In accordance with the National Marine Fisheries Service recommendations (NMFS, 1995) all spring migrants were bypassed at McNary Dam in 1996. Mechanical problems within the McNary collection system resulted in collection and sampling activities being delayed until April 18 at this site, while sampling and collection began on the scheduled starting date of April 1 at Lower Monumental Dam. Monitoring operations were conducted through December 14 at McNary Dam and through October 28 at Lower Monumental Dam. An ongoing transportation evaluation summer migrant marking program was conducted at McNary Dam in 1996 by the NMFS. This necessitated the sampling of 394,211 additional fish beyond the recommended sampling guidelines. All total, 509,237 and 31,219 juvenile salmonids were anesthetized and individually counted, examined for scale loss, injuries, and brands by WDFW Smolt Monitoring personnel in 1996 at McNary Dam and Lower Monumental Dam, respectively.

Hillson, Todd; Lind, Sharon; Price, William (Washington Department of Fish and Wildlife, Olympia, WA)

1997-07-01T23:59:59.000Z

82

Multifractal scaling behavior analysis for existing dams  

Science Conference Proceedings (OSTI)

The fractal theory was used to describe long term behavior of dam structures by means of determining (mono-) fractal exponents. Many records do not exhibit a simple monofractal scaling behavior, which can be accounted for by a single scaling exponent. ... Keywords: Dam, Long term behavior, Multifractal detrended fluctuation analysis, Observation time series

Huaizhi Su, Zhiping Wen, Feng Wang, Bowen Wei, Jiang Hu

2013-09-01T23:59:59.000Z

83

Mississippi Nuclear Profile - Grand Gulf  

U.S. Energy Information Administration (EIA) Indexed Site

Grand Gulf" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

84

Seismic Analysis of Morrow Point Dam  

DOE Green Energy (OSTI)

The main objective of this study is to perform nonlinear dynamic earthquake time history analyses on Morrow Point Dam, which is located 263 km southwest of Denver, Colorado. This project poses many significant technical challenges, one of which is to model the entire Morrow Point Dam/Foundation Rock/Reservoir system which includes accurate geology topography. In addition, the computational model must be initialized to represent the existing dead loads on the structure and the stress field caused by the dead loads. To achieve the correct dead load stress field due to gravity and hydrostatic load, the computer model must account for the manner in which the dams were constructed. Construction of a dam finite element model with the correct as-built geometry of the dam structure and simply ''turning on'' gravity in the computer model will generally lead to an incorrect initial stress field in the structure. The sequence of segmented lifts typical of dam construction has a significant impact on the static stress fields induced in the dam. In addition, the dam model must also account for the interaction between the adjacent dam segments across the dam contraction joints. As a result of these challenges, it was determined that a significant amount of code development was required in order to accurately simulate the motion of the dam structure. Modifications to the existing slide surfaces are needed to allow for appropriate modeling of the shear keys across the contraction joints. Furthermore, a model for hydrodynamic interaction was also implemented into NIKE3D and DYNA3D for fluid representation in the 3D dam system finite element model. Finally, the modeling of the 3D dam system results in a very large computational model, which makes it difficult to perform a static initialization using an implicit code. Traditionally, for these large models, the model has been initialized over a long time scale using an explicit code. However, recent advancements have made it possible to run NIKE3D in ''parallel'' on relatively small parallel machines as well as on the ASCI platforms.

Noble, C R

2002-04-01T23:59:59.000Z

85

<GrandPrairie>  

NLE Websites -- All DOE Office Websites (Extended Search)

Grande Praire Wind Farm, O'Neill, NE Grande Praire Wind Farm, O'Neill, NE The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), intends to prepare an environmental impact statement (EIS) on the proposed interconnection of the Grande Prairie Wind Farm (Project) in Holt County, near the city of O'Neill, Nebraska. Grande Prairie Wind, LLC (Grande Prairie), a subsidiary of Midwest Wind Energy Development Group, LLC, has applied to Western to interconnect their proposed Project to Western's power transmission system. Western is issuing this notice to inform the public and interested parties about Western's intent to prepare an EIS, conduct a public scoping process, and invite the public to comment on the scope, proposed action, alternatives, and other issues to be addressed in the EIS.

86

Dam Safety Regulations (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Regulations (Connecticut) Safety Regulations (Connecticut) Dam Safety Regulations (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection All dams, except those owned by the U.S., are under the jurisdiction of these regulations. These dams will be classified by hazard rating, and may

87

Spokane Tribal Hatchery, 2002 Annual Report.  

DOE Green Energy (OSTI)

The Spokane Tribal Hatchery (Galbraith Springs) project originated from the Northwest Power Planning Council (NPPC) 1987 Columbia Basin Fish and Wildlife Program. The goal of this project is to aid in the restoration and enhancement of the Lake Roosevelt and Banks Lake fisheries adversely affected by the construction and operation of Grand Coulee Dam. The objective is to produce kokanee salmon and rainbow trout for release into Lake Roosevelt for maintaining a viable fishery. The goal and objective of this project adheres to the NPPC Resident Fish Substitution Policy and specifically to the biological objectives addressed in the NPPC Columbia River Basin Fish and Wildlife Program to mitigate for hydropower related fish losses in the blocked area above Chief Joseph/Grand Coulee Dams.

Peone, Tim L. (Spokane Tribe of Indians, Willpinit, WA)

2003-03-01T23:59:59.000Z

88

EA-1679: Finding of No Significant Impact  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

89

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network (OSTI)

Figure 4. Water Framework Directive decision-making processand the Water Framework Directive LA 222 UC Berkeley May 16Dam and the Water Framework Directive Justin Lawrence, Josh

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

90

Dams and Energy Sectors Interdependency Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[Type text] [Type text] Dams and Energy Sectors Interdependency Study September 2011 September 2011 Page 2 Abstract The U.S. Department of Energy (DOE) and the U.S. Department of Homeland Security (DHS) collaborated to examine the interdependencies between two critical infrastructure sectors - Dams and Energy. 1 The study highlights the importance of hydroelectric power generation, with a particular emphasis on the variability of weather patterns and competing demands for water which determine the water available for hydropower production. In recent years, various regions of the Nation suffered drought, impacting stakeholders in both the Dams and Energy Sectors. Droughts have the potential to affect the operation of dams and reduce hydropower production,

91

Milner Dam Wind Park | Open Energy Information  

Open Energy Info (EERE)

Milner Dam Wind Park Milner Dam Wind Park Jump to: navigation, search Name Milner Dam Wind Park Facility Milner Dam Wind Park Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exergy Developer Exergy Energy Purchaser Idaho Power Location Cassia County ID Coordinates 42.495962°, -114.021106° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.495962,"lon":-114.021106,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

92

Dams (South Dakota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Dams (South Dakota) Dams (South Dakota) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State South Dakota Program Type Siting and Permitting Provider South Dakota Department of Environment and Natural Resources Dam construction in South Dakota requires a Location Notice or a Water Right Permit. A Location Notice is a form that must be filed with the County Register of Deeds, and is the only paperwork required if (a) the proposed dam will impound 25 acre feet of water or less at the primary

93

Roller-Compacted Concrete for Dams  

Science Conference Proceedings (OSTI)

Placing mass concrete by the roller-compacted method improves the economics of hydroelectric dam construction. Many sites previously considered uneconomical for embankment or conventional concrete construction may now prove feasible.

1986-09-29T23:59:59.000Z

94

Dams (South Dakota) | Open Energy Information  

Open Energy Info (EERE)

Page Edit with form History Share this page on Facebook icon Twitter icon Dams (South Dakota) This is the approved revision of this page, as well as being the most...

95

Rio Grande Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rio Grande Compact (Texas) Rio Grande Compact (Texas) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility StateProvincial Govt Industrial...

96

Emergency Fish Restoration Project; Final Report 2002.  

DOE Green Energy (OSTI)

Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.

LeCaire, Richard

2003-03-01T23:59:59.000Z

97

Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.  

DOE Green Energy (OSTI)

The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

United States. Bonneville Power Administration.

1995-01-01T23:59:59.000Z

98

Early life history study of Grande Ronde River Basin chinook salmon. Annual progress report, September 1, 1994--August 31, 1995  

DOE Green Energy (OSTI)

The Grande Ronde River originates in the Blue Mountains in northeast Oregon and flows 334 kilometers to its confluence with the Snake River near Rogersburg, Washington. Historically, the Grande Ronde River produced an abundance of salmonids including stocks of spring, summer and fall chinook salmon, sockeye salmon, coho salmon, and summer steelhead. During the past century, numerous factors have caused the reduction of salmon stocks such that only stocks of spring chinook salmon and summer steelhead remain. The sizes of spring chinook salmon populations in the Grande Ronde basin also have been declining steadily and are substantially depressed from estimates of historic levels. It is estimated that prior to the construction of the Columbia and Snake River dams, more than 20,000 adult spring chinook salmon returned to spawn in the Grande Ronde River basin. A spawning escapement of 12,200 adults was estimated for the Grande Ronde River basin in 1957. Recent population estimates have been variable year to year, yet remain a degree of magnitude lower than historic estimates. In 1992, the escapement estimate for the basin was 1,022 adults (2.4 {times} number of redds observed). In addition to a decline in population abundance, a constriction of spring chinook salmon spawning distribution is evident in the Grande Ronde basin. Historically, 21 streams supported spawning chinook salmon, yet today the majority of production is limited to eight tributary streams and the mainstem upper Grande Ronde River. Numerous factors are thought to contribute to the decline of spring chinook salmon in the Snake River and its tributaries. These factors include passage problems and increased mortality of juvenile and adult migrants at mainstem Columbia and Snake river dams, overharvest, and habitat degradation associated with timber, agricultural, and land development practices. More than 80% of anadromous fish habitat in the upper Grande Ronde River is considered to be degraded.

Keefe, M.; Anderson, D.J.; Carmichasel, R.W.; Jonasson, B.C.

1996-06-01T23:59:59.000Z

99

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

DOE Green Energy (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

100

Neutrino Mass and Grand Unification  

E-Print Network (OSTI)

Seesaw mechanism appears to be the simplest and most appealing way to understand small neutrino masses observed in recent experiments. It introduces three right handed neutrinos with heavy masses to the standard model, with at least one mass required by data to be close to the scale of conventional grand unified theories. This may be a hint that the new physics scale implied by neutrino masses and grand unification of forces are one and the same. Taking this point of view seriously, I explore different ways to resolve the puzzle of large neutrino mixings in grand unified theories such as SO(10) and models based on its subgroup $SU(2)_L\\times SU(2)_R\\times SU(4)_c$.

R. N. Mohapatra

2004-12-03T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Making an automated monitoring system work at Tolt Dam  

SciTech Connect

A major upgrade of the dam safety program at Tolt Dam in Seattle, Washington is described. The upgrade was prompted by the age (30 years) of the dam, the addition of a hydroelectric plant, and public concern. The program is based on an automated condition monitoring and advance warning system. The design, implementation, and operating experience of the system are described.

Marilley, J.M. [Seattle Water Dept., WA (United States); Myers, B.K. [Woodward-Clyde Consultants, Seattle, WA (United States)

1996-10-01T23:59:59.000Z

102

WINDAM: modules to analyze overtopping of earth embankment dams  

Science Conference Proceedings (OSTI)

Windows Dam Analysis Modules (WINDAM) is a set of modular software components under development for the analysis of overtopped earth embankments. The initial modules address the routing of floods through reservoirs with dam overtopping and evaluation ... Keywords: dam design and analysis, erosion, flood control, hydraulic modelling, numerical analysis, simulation

Mitchell L. Neilsen; Darrel M. Temple; Gregory J. Hanson

2007-08-01T23:59:59.000Z

103

Construction of high embankment dam material flow equilibrium system  

Science Conference Proceedings (OSTI)

As high embankment dam engineering is often large-scale, how to achieve equilibrium of material flow is a critical factor affecting the construction progress of embankment dam engineering and an important approach to save resource and reduce construction ... Keywords: Embankment dam, Material flow equilibrium, Traffic network

Yan Zhang; Guo-Ping Xia

2009-07-01T23:59:59.000Z

104

Executive Summary The Report of the World Commission on Dams  

E-Print Network (OSTI)

in drainage applications. Also, dams often have vertical or near-vertical facing, so gravity has a differentGEOSYNTHETIC DAM LINING SYSTEMS By: Christine T. Weber1 and Jorge Zornberg, Advisor Abstract: The overall goal of this project is to contribute towards the use of geosynthetics in the design of dams

Kammen, Daniel M.

105

"Deadman Island Lock and Dam, Ohio River" The Military Engineer  

E-Print Network (OSTI)

of a concrete gravity dam. It is important to use best estimates of loadings and properties and masonry gravity dams for all failure modes including overtopping (Douglas et al 1999). Table 4 Historic annual frequency of failure of concrete and masonry gravity dams Frequency of Failure x 10-5 Concrete

US Army Corps of Engineers

106

GEOSYNTHETIC DAM LINING SYSTEMS By: Christine T. Weber1  

E-Print Network (OSTI)

). Finally, the fish ladder at Little Goose Dam uses pumped river water rather than a gravity flow. Of all GOOSE DAM ON UPSTREAM MOVEMENTS OF ADULT CHINOOK SALMON, ONCORHYNCHUS TSHAWYTSCHA A major environmental effects of hydroelectric dams (Figure 1) on the upstream movements of adult salmonids. Results indicated

Zornberg, Jorge G.

107

Spelunking in La Cueva Grande  

Science Conference Proceedings (OSTI)

La Cueva Grande is the 5-sided immersive facility put into place at Los Alamos National Laboratory. It was the highest-resolution stereo immersive facility in the world at the time of first use in 2005. The design and common use cases of LCG are presented, ... Keywords: projection systems, virtual reality

Laura Monroe

2008-08-01T23:59:59.000Z

108

A Theoretical Study of Cold Air Damming  

Science Conference Proceedings (OSTI)

The dynamics of cold air damming are examined analytically with a two-layer steady state model. The upper layer is a warm and saturated cross-mountain (easterly or southeasterly onshore) flow. The lower layer is a cold mountain-parallel (...

Qin Xu

1990-12-01T23:59:59.000Z

109

Net Force on a Dam Consider a dam holding back an incompressible fluid such as water. Let us suppose that  

E-Print Network (OSTI)

and dams Research dealing with the interaction between a gravity cur- rent and obstacles is scare. A first catching dam heights. For the reference avalanche, the veloc- ity just behind the nose in the head% for the 2-D simulation. The reduction in front velocity due to the presence of dams was an increasing

Keesling, James

110

Grand Challenges in Energy by Secretary Steven Chu | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Challenges in Energy by Secretary Steven Chu Grand Challenges in Energy by Secretary Steven Chu Grand Challenges in Energy by Secretary Steven Chu More Documents &...

111

The Particle Adventure | Unsolved Mysteries | Grand Unified Theory  

NLE Websites -- All DOE Office Websites (Extended Search)

Unsolved Mysteries - Grand Unified Theory Grand Unified Theory Today, one of the major goals of particle physics is to unify the various fundamental forces in a Grand Unified...

112

PP-53 Rio Grande Electric Cooperative, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. Presidential Permit authorizing Rio Grande Electric Cooperative, Inc.to construct, operate, and...

113

PP-33 Rio Grande Electric Cooperative Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rio Grande Electric Cooperative Inc PP-33 Rio Grande Electric Cooperative Inc Presidential permit authorizing Grande Electric Cooperative Inc to construct, operate, and maintain...

114

Sustainable Energy Dam: research into possible improvement of dam/dike safety by application of sustainable energy on dams/dikes.  

E-Print Network (OSTI)

??A study on the use of the Afsluitdijk (or more generic, enclosure dams in general) for the generation of energy. Focus in this study in (more)

Wondergem, D.

2008-01-01T23:59:59.000Z

115

EV Everywhere Grand Challenge Blueprint  

NLE Websites -- All DOE Office Websites (Extended Search)

A Message from A Message from the Assistant Secretary Every challenge presents an even greater opportunity, and the EV Everywhere Grand Challenge is no exception. The need for clean energy solutions drives the most important economic development race of the 21st century, providing opportunity for America to invent, manufacture, and export clean energy technologies. Recognizing that vehicle electrification is an essential part of our country's "all-of-the above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to be the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years.

116

Mountain View Grand | Open Energy Information  

Open Energy Info (EERE)

Grand Grand Jump to: navigation, search Name Mountain View Grand Facility Mountain View Grand Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Mountain View Grand Developer Sustainable Energy Developments Energy Purchaser Mountain View Grand Location Mountain View Grand Resort & Spa NH Coordinates 44.397987°, -71.590306° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.397987,"lon":-71.590306,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

117

Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.  

DOE Green Energy (OSTI)

Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

Patterson, Scott

2009-04-10T23:59:59.000Z

118

Hoover Dam Bypass Project Phase II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1478 DOE/EA-1478 ENVIRONMENTAL ASSESSMENT Western' s Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead #5 and #7 230-kV Transmission Lines with the Henderson-Mead #1 230-kV Transmission Line, Clark County, Nevada) Prepared for: U.S. Department of Energy Western Area Power Administration 615 S. 43 rd Avenue Phoenix, Arizona 85009 Prepared by: Transcon Environmental 3740 East Southern Avenue, Suite 218 Mesa, Arizona 85206 (480) 807-0095 October 2003 Western Area Power Administration Hoover Dam Bypass Project Phase II page i Environmental Assessment TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................................1 1.1 Background..................................................................................................................................1

119

Safe Dams Act of 1972 (Tennessee) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safe Dams Act of 1972 (Tennessee) Safe Dams Act of 1972 (Tennessee) Safe Dams Act of 1972 (Tennessee) < Back Eligibility Agricultural Commercial Construction General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Transportation Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Tennessee Program Type Environmental Regulations Siting and Permitting Provider Tennessee Department Of Environment and Conservation The Safe Dams Act of 1973 (SDA) gives the Commissioner of the Department of Environment and Conservation the power to issue certificates authorizing the construction, alteration, or operation of a dam. A dam is defined as any artificial barrier, together with appurtenant works, which does or may impound or divert water, and which either (1) is or will be twenty (20)

120

Women @ Energy: Kerstin Kleese van Dam | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Kerstin Kleese van Dam Kerstin Kleese van Dam Women @ Energy: Kerstin Kleese van Dam March 27, 2013 - 3:41pm Addthis Kerstin Kleese van Dam is an associate division director of the Computational Science and Mathematics Division and leads the Scientific Data Management Group at Pacific Northwest National Laboratory. Kerstin Kleese van Dam is an associate division director of the Computational Science and Mathematics Division and leads the Scientific Data Management Group at Pacific Northwest National Laboratory. Check out other profiles in the Women @ Energy series and share your favorites on Pinterest. Kerstin Kleese van Dam has led the charge at Pacific Northwest National Laboratory to resolve data management, analysis, and knowledge discovery challenges in extreme-scale data environments. She also directs data

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Dams and Reservoirs Safety Act (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dams and Reservoirs Safety Act (South Carolina) Dams and Reservoirs Safety Act (South Carolina) Dams and Reservoirs Safety Act (South Carolina) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Institutional Savings Category Water Buying & Making Electricity Program Info State South Carolina Program Type Siting and Permitting Provider South Carolina Department of Health and Environmental Control The Dams and Reservoirs Safety Act provides for the certification and inspection of dams in South Carolina and confers regulatory authority on the Department of Health and Environmental Control. Owners of dams and reservoirs are responsible for maintaining the safety of the structures,

122

Georgia Safe Dams Act of 1978 (Georgia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safe Dams Act of 1978 (Georgia) Safe Dams Act of 1978 (Georgia) Georgia Safe Dams Act of 1978 (Georgia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The purpose of the Georgia Safe Dams Act is to provide regulation,

123

Montana Dam Safety Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Montana Dam Safety Act (Montana) Montana Dam Safety Act (Montana) Montana Dam Safety Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Retail Supplier Institutional Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1985 State Montana Program Type Siting and Permitting Provider Montana Department of Natural Resources and Conservation This Act establishes the state's interest in the construction of dams for water control and regulation and for hydropower generation purposes. It

124

Dam Design and Construction (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dam Design and Construction (Wisconsin) Dam Design and Construction (Wisconsin) Dam Design and Construction (Wisconsin) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1985 State Wisconsin Program Type Safety and Operational Guidelines Provider Department of Natural Resources These regulations apply to dams that are not owned by the U.S. government

125

Permission for Dam Construction and Operation (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintain, or operate a dam on a stream for manufacturing or industrial purposes. Other powers of the Department pertaining to such construction are listed in this section...

126

Annotated bibliography for the humpback chub (Gila cypha) with emphasis on the Grand Canyon population.  

DOE Green Energy (OSTI)

Glen Canyon Dam is a hydroelectric facility located on the Colorado River in Arizona that is operated by the U.S. Bureau of Reclamation (Reclamation) for multiple purposes including water storage, flood control, power generation, recreation, and enhancement of fish and wildlife. Glen Canyon Dam operations have been managed for the last several years to improve conditions for the humpback chub (Gila cypha) and other ecosystem components. An extensive amount of literature has been produced on the humpback chub. We developed this annotated bibliography to assist managers and researchers in the Grand Canyon as they perform assessments, refine management strategies, and develop new studies to examine the factors affecting humpback chub. The U.S. Geological Survey recently created a multispecies bibliography (including references on the humpback chub) entitled Bibliography of Native Colorado River Big Fishes (available at www.fort.usgs.gov/Products/data/COFishBib). That bibliography, while quite extensive and broader in scope than ours, is not annotated, and, therefore, does not provide any of the information in the original literature. In developing this annotated bibliography, we have attempted to assemble abstracts from relevant published literature. We present here abstracts taken unmodified from individual reports and articles except where noted. The bibliography spans references from 1976 to 2009 and is organized in five broad topical areas, including: (1) biology, (2) ecology, (3) impacts of dam operations, (4) other impacts, and (5) conservation and management, and includes twenty subcategories. Within each subcategory, we present abstracts alphabetically by author and chronologically by year. We present relevant articles not specific to either the humpback chub or Glen Canyon Dam, but cited in other included reports, under the Supporting Articles subcategory. We provide all citations in alphabetical order in Section 7.

Goulet, C. T.; LaGory, K. E.; Environmental Science Division

2009-10-05T23:59:59.000Z

127

Vehicle Technologies Office: EV Everywhere Grand Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

Charging Community and Fleet Readiness Workforce Development Plug-in Electric Vehicle Basics EV Everywhere Grand Challenge With their immense potential for increasing the...

128

The Downstream Geomorphic Effects of Dams: A Comprehensive and Comparative Approach  

E-Print Network (OSTI)

costs of dredging or decommissioning such structures. Whilegreatest component of dam decommissioning costs (e.g. , U.S.operation and ultimate decommissioning. Many of the dams on

Minear, Justin Toby

2010-01-01T23:59:59.000Z

129

A topography of dams in China : impacts to agriculture, labor, and migration.  

E-Print Network (OSTI)

??Dams are often promoted as a tool to reduce poverty and spur economic development. Dam construction worldwide, and particularly in China, which has built nearly (more)

[No author

2011-01-01T23:59:59.000Z

130

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 1995-2002 Summary Report.  

DOE Green Energy (OSTI)

The Grande Ronde Basin once supported large runs of chinook salmon Oncorhynchus tshawytscha and estimated peak escapements in excess of 10,000 occurred as recently as the late 1950's (U.S. Army Corps of Engineers 1975). Natural escapement declines in the Grande Ronde Basin have been severe and parallel those of other Snake River populations. Reduced productivity has primarily been attributed to increased mortality associated with downstream and upstream migration past eight dams and reservoirs in the Snake and Columbia rivers. Reduced spawner numbers, combined with human manipulation of previously important spawning and rearing habitat in the Grande Ronde Basin, have resulted in decreased spawning distribution and population fragmentation of chinook salmon in the Grande Ronde Basin (Figure 1; Table 1). Escapement of spring/summer chinook salmon in the Snake River basin included 1,799 adults in 1995, less than half of the previous record low of 3,913 adults in 1994. Catherine Creek, Grande Ronde River and Lostine River were historically three of the most productive populations in the Grande Ronde Basin (Carmichael and Boyce 1986). However, productivity of these populations has been poor for recent brood years. Escapement (based on total redd counts) in Catherine Creek and Grande Ronde and Lostine rivers dropped to alarmingly low levels in 1994 and 1995. A total of 11, 3 and 16 redds were observed in 1994 in Catherine Creek, upper Grande Ronde River and Lostine River, respectively, and 14, 6 and 11 redds were observed in those same streams in 1995. In contrast, the maximum number of redds observed in the past was 505 in Catherine Creek (1971), 304 in the Grande Ronde River (1968) and 261 in 1956 in the Lostine River (Tranquilli et al 2003). Redd counts for index count areas (a standardized portion of the total stream) have also decreased dramatically for most Grande Ronde Basin streams from 1964-2002, dropping to as low as 37 redds in the 119.5 km in the index survey areas in 1995 from as high as 1,205 redds in the same area in 1969 (Table 1). All streams reached low points (0-6 redds in the index areas) in the 1990's, except those in which no redds were found for several years and surveys were discontinued, such as Spring, Sheep and Indian creeks which had a total of 109 redds in 1969. The Minam and Wenaha rivers are tributaries of the Grande Ronde River located primarily in wilderness areas. Chinook salmon numbers in these two streams (based on redd counts) also decreased dramatically beginning in the early 1970's (Table 1). Since then there have been a few years of increasing numbers of redds but counts have generally been 25-40% of the number seen in the 1960's. No hatchery fish have been released into either of these streams and we monitor them during spawning ground surveys for the presence of hatchery strays. These populations will be used as a type of control for evaluating our supplementation efforts in Catherine Creek, upper Grande Ronde River and Lostine River. In this way, we can attempt to filter out the effects of downstream variables, over which we have no control, when we interpret the results of the captive broodstock program as the F1 and F2 generations spawn and complete their life cycles in the wild. The Grande Ronde Basin Captive Broodstock Program was initiated because these chinook salmon populations had reached critical levels where dramatic and unprecedented efforts were needed to prevent extinction and preserve any future options for use of endemic fish for artificial propagation programs for recovery and mitigation. This program was designed to quickly increase numbers of returning adults, while maintaining the genetic integrity of each endemic population.

Hoffnagle, Timothy; Carmichael, Richard; Noll, William

2003-12-01T23:59:59.000Z

131

Dams and Energy Sectors Interdependency Study, September 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dams and Energy Sectors Interdependency Study, September 2011 Dams and Energy Sectors Interdependency Study, September 2011 Dams and Energy Sectors Interdependency Study, September 2011 The U.S. Department of Energy (DOE) and the U.S. Department of Homeland Security (DHS) collaborated to examine the interdependencies between two critical infrastructure sectors - Dams and Energy. The study highlights the importance of hydroelectric power generation, with a particular emphasis on the variability of weather patterns and competing demands for water which determine the water available for hydropower production. Dams-Energy Interdependency Study.pdf More Documents & Publications Hydroelectric Webinar Presentation Slides and Text Version Impacts of Long-term Drought on Power Systems in the U.S. Southwest - July 2012 Before the Senate Energy and Natural Resources Committee

132

Dam Safety and Encroachments Act (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dam Safety and Encroachments Act (Pennsylvania) Dam Safety and Encroachments Act (Pennsylvania) Dam Safety and Encroachments Act (Pennsylvania) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Savings Category Water Buying & Making Electricity Program Info State Pennsylvania Program Type Safety and Operational Guidelines Provider Pennsylvania Department of Environmental Protection This act sets the standards and criteria for the siting and design of dams, water obstructions and encroachments considering both existing and projected conditions. It requires operational plans to be prepared and implemented by owners and also requires monitoring, inspection and reporting of conditions affecting the safety of dams, water obstructions

133

Review: Red Pedagogy: Native American Social and Political Thought by Sandy Grande  

E-Print Network (OSTI)

and Political Thought by Sandy Grande. New York: Rowman &discourse. For these reasons, Sandy Grandes (2004) text

Caldern, Dolores

2006-01-01T23:59:59.000Z

134

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.  

DOE Green Energy (OSTI)

Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

Griswold, Jim; Townsend, Richard L.; Skalski, John R.

2008-12-01T23:59:59.000Z

135

SunShot Grand Challenge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28...

136

Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show January 30,...

137

ORISE: Helping Bureau of Reclamation with National Security Exercises at  

NLE Websites -- All DOE Office Websites (Extended Search)

plans full-scale exercises to test security at major U.S. Bureau of plans full-scale exercises to test security at major U.S. Bureau of Reclamation dams ORISE has served as lead exercise planner for the U.S. Department of the Interior, Bureau of Reclamation's Critical Infrastructure Exercise Program since its inception in 2003. Six of the dams operated by BOR are designated as National Critical Infrastructure facilities: Flaming Gorge, Folsom, Glen Canyon, Grand Coulee, Hoover and Shasta. The program helps BOR answer an important question-are these massive dams secure in the event of a terrorist attack? Exercise programs for each of these critical facilities typically extend over a 12-month period during which ORISE facilitates a series of exercise events that test emergency response plans. ORISE guides the dam's staff,

138

Dams have played an important role in human development throughout the world for thousands  

E-Print Network (OSTI)

Academy of Sciences, Beijing 100093, PR China; 3 Department of Renewable Resources, University of Alberta than 22 000 large dams (but only 22 before 1949), China is the largest dam-building country; by way , and Zehao Shen7 The Three Gorges Dam in China is the largest dam ever built. Its impacts on the biodiversity

Wu, Jianguo "Jingle"

139

Uplift Pressures, Shear Strengths, and Tensile Strengths for Stability Analysis of Concrete Gravity Dams: Volume 1  

Science Conference Proceedings (OSTI)

Using generic values in stability analyses of existing concrete dams can result in expensive and unnecessary remedial work. The information in this report will help dam owners predict dam stability under extreme loading conditions and identify the conditions that control uplift pressure distributions at study dams.

1992-08-01T23:59:59.000Z

140

Under consideration for publication in J. Fluid Mech. 1 Dam breaking seiches  

E-Print Network (OSTI)

of the dam is m, and g is gravity, the equation of motion for the dam's position can be written #12;Seiches Benjamin (1955), if the dam's edge is relatively sharp, gravity is negligible, and the outflow is similar assembly. As the dam moves up and down, and the assembly rotates, the component of gravity acting

Balmforth, Neil

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Dams, Mills, and Electric Power (Missouri) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mills, and Electric Power (Missouri) Mills, and Electric Power (Missouri) Dams, Mills, and Electric Power (Missouri) < Back Eligibility Commercial Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Missouri Program Type Siting and Permitting Provider Missouri Department of Natural Resources The Water Resources Center of the Missouri Department of Natural Resources is responsible for implementing regulations pertaining to dam and reservoir safety. Any person or corporation may erect a dam across any watercourse, provided that: (a) the entity is chartered to construct, operate and

142

Regulation of Dams and Bridges Affecting Navigable Waters (Wisconsin) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dams and Bridges Affecting Navigable Waters Dams and Bridges Affecting Navigable Waters (Wisconsin) Regulation of Dams and Bridges Affecting Navigable Waters (Wisconsin) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 2007 State Wisconsin Program Type Siting and Permitting Provider Department of Natural Resources Chapter 31 of the Wisconsin Statutes lays out the regulations relevant to

143

Grand Meadow Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Grand Meadow Wind Farm Grand Meadow Wind Farm Jump to: navigation, search Name Grand Meadow Wind Farm Facility Grand Meadow Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Developer EnXco Energy Purchaser Xcel Energy Location Dexter MN Coordinates 43.707798°, -92.654071° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.707798,"lon":-92.654071,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

144

EV Everywhere Grand Challenge - Battery Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Sandalow, Under Secretary of Energy (acting) and Assistant Secretary for Policy and International Affairs 8:45-8:55 AM SETTING THE STAGE FOR THE EV EVERYWHERE GRAND CHALLENGE Dr....

145

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011  

DOE Green Energy (OSTI)

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-06-04T23:59:59.000Z

146

Rules and Regulations for Dam Safety (Rhode Island)  

Energy.gov (U.S. Department of Energy (DOE))

These rules and regulations seek to provide for the safety of dams to protect the public, real property, and natural resources by establishing reasonable standards and creating a public record for...

147

Libby Dam Wildlife Habitat Enhancement, 1992 Final Report.  

DOE Green Energy (OSTI)

This is the final report of a project that was initiated in September, 1984 to mitigate for the loss of big game winter and spring range by the Libby Dam hydroelectric facility.

Holifield, Jennifer; Komac, Ron (Kootenai National Forest, Fisher River Ranger District, Libby MT)

1993-03-01T23:59:59.000Z

148

Microsoft Word - Appendix H - Emergency Response Plan for Dams...  

Office of Legacy Management (LM)

H Emergency Response Plan for the Rocky Flats Site Dams This page intentionally left blank LMSRFSS04533-3.0 Rocky Flats, Colorado, Site Emergency Response Plan for the Rocky...

149

Centrifuge Modeling and Analysis of Concrete Gravity Dams  

Science Conference Proceedings (OSTI)

This report contains general background information on centrifuge experimentation and linear elastic fracture mechanics pertaining to concrete gravity dam models, and explains in detail the experimental methodology and procedures developed for testing concrete gravity dam models in centrifuges. An important detail in the experimental procedure is that the models are loaded upstream with water and, at fracture, have water uplift pressure within any cracks. Finally, test results and comparisons to analytic...

1995-12-14T23:59:59.000Z

150

Monitoring and Evaluation of Smolt Migration in the Columbia Basin, Volume XIV; Evaluation of 2006 Prediction of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead at Rock Island, Lower Granite, McNary, John Day and Bonneville Dams using Program Real Time, Technical Report 2006.  

DOE Green Energy (OSTI)

Program RealTime provided monitoring and forecasting of the 2006 inseason outmigrations via the internet for 32 PIT-tagged stocks of wild ESU chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville Dams. Twenty-four stocks are of wild yearling chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2006, and have at least one year's historical migration data previous to the 2006 migration. These stocks originate in drainages of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through the tag identification and monitored at Lower Granite Dam. In addition, seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling chinook salmon and the steelhead trout runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead trout forecasted to Rock Island, McNary, John Day, and Bonneville Dams.

Griswold, Jim

2007-01-01T23:59:59.000Z

151

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam  

DOE Green Energy (OSTI)

This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other fish was large enough to be mature, but at the time of capture its sex was unable to be determined, indicating it may not have been mature at the time of capture. These fish are expected to enter their natal tributaries in early summer or fall of 2009.

Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

2009-07-13T23:59:59.000Z

152

EIS-0285-SA-23: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Raver No.1 and 2 from 603 to 755 and the Olympia - Grand Coulee from 702 to 705 Transmission Line ROW's Supplement Analysis for the Transmission System Vegetation...

153

EA-1679: Revision Sheet for Final Environmental Assessment |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1679: Revision Sheet for Final Environmental Assessment Grand Coulee's Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties,...

154

CX-005845: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-005845: Categorical Exclusion Determination Selected Wood Pole Replacement and Minor Access Road Maintenance Along the Grand Coulee-Creston...

155

CX-006580: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan 2 115-Kilovolt Transmission Line CX(s)...

156

Division of Water, Part 673: Dam Safety Regulations (New York) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Dam Safety Regulations (New York) 3: Dam Safety Regulations (New York) Division of Water, Part 673: Dam Safety Regulations (New York) < Back Eligibility Fed. Government Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State New York Program Type Safety and Operational Guidelines Provider NY Department of Environmental Conservation These regulations address dam safety, define dam hazard categories and inspection procedures, and apply to any owner of a dam. Dam owners are required to maintain dams in a safe condition at all times and to comply with Department inquiries for information on the status of a given dam

157

Rio Grande South | Open Energy Information  

Open Energy Info (EERE)

Rio Grande South Rio Grande South Facility Rio Grande South Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Gulf of Mexico TX Coordinates 26.189°, -97.053° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.189,"lon":-97.053,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

158

Rio Grande North | Open Energy Information  

Open Energy Info (EERE)

Rio Grande North Rio Grande North Facility Rio Grande North Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Offshore from South Padre Island TX Coordinates 26.364°, -97.078° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.364,"lon":-97.078,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

159

District-heating system, La Grande, Oregon  

DOE Green Energy (OSTI)

The area suggested for district heating feasibility study encompassed slightly over 400 acres extending north and south from the geographic center of the city. This district was subdivided into 8 areas, which include the Grande Ronde Hospital, Eastern Oregon State College, La Grande school district, one institutional area, one commercial area and three residential areas. Basic space heating loads developed for the various areas after a survey by county personnel and computation using a computer program form the basis for this economic feasibility study.

Not Available

1982-01-01T23:59:59.000Z

160

SunShot Grand Challenge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Grand Challenge SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28 SunShot Grand Challenge Participants gather for the plenary session at the SunShot Grand Challenge Summit and Technology Forum in Denver, Colorado. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:10 Arun Majumdar, Founding Director, ARPA-E 2 of 28 Arun Majumdar, Founding Director, ARPA-E Arun Majumdar, Founding Director, ARPA-E gives the welcoming remarks. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:16 Energy Secretary Steven Chu at SunShot Grand Challenge 3 of 28 Energy Secretary Steven Chu at SunShot Grand Challenge Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:32

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Grand Unification with and without Supersymmetry  

Science Conference Proceedings (OSTI)

Grand Unified Theories based on the group SO(10) generically provide interesting and testable relations between the charged fermions and neutrino sector masses and mixings. In the light of the recent neutrino data, we reexamine these relations both in supersymmetric and non-supersymmetric models, and give a brief review of their present status.

Melfo, Alejandra [CFF, Universidad de Los Andes, Merida (Venezuela); Institute J. Stefan, Ljubljana (Slovenia)

2007-06-19T23:59:59.000Z

162

Four Dam Pool Power Agency FDPPA | Open Energy Information  

Open Energy Info (EERE)

Dam Pool Power Agency FDPPA Dam Pool Power Agency FDPPA Jump to: navigation, search Name Four Dam Pool Power Agency (FDPPA) Place Anchorage, Alaska Zip 99515 Sector Hydro Product Joint action agency consisting of four hydroelectric projects that was organized by five electric cooperatives that purchase power from the facilities. Coordinates 38.264985°, -85.539014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.264985,"lon":-85.539014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

163

Ninety-Nine-Year Sediment Yield Record of the Middle Cuyahoga River Watershed Contained Within the Ohio Edison Dam Pool.  

E-Print Network (OSTI)

??The 17.4 m tall Ohio Edison Dam was constructed in 1912 on the Cuyahoga River near the city of Akron, Ohio. The dam was installed (more)

Mann, Kristofer Clayton

2012-01-01T23:59:59.000Z

164

The Effects of Subcloud-Layer Diabatic Processes on Cold Air Damming  

Science Conference Proceedings (OSTI)

The hypothesis that clouds and precipitation enhance cold air damming is examined. A case example of cloud/precipitation-induced enhancement of damming is presented and a conceptual model is proposed.

J. M. Fritsch; J. Kapolka; P. A. Hirschberg

1992-01-01T23:59:59.000Z

165

Mills, Dams, and Reservoirs (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Mills, Dams, and Reservoirs (Massachusetts) Mills, Dams, and Reservoirs (Massachusetts) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Massachusetts Program Type Siting and Permitting Provider Department of Conservation and Recreation This chapter of the Massachusetts General Laws outlines procedures to

166

The Sensor Fish - Making Dams More Salmon-Friendly  

DOE Green Energy (OSTI)

This article describes the Sensor Fish, an instrument package that travels through hydroelectric dams collecting data on the hazardous conditions that migrating salmon smolt encounter. The Sensor Fish was developed by Pacific Northwest National Laboratory with funding from DOE and the US Army Corps of Engineers and has been used at several federal and utility-run hydroelectric projects on the Snake and Columbia Rivers of the US Pacific Northwest. The article describes the evolution of the Sensor Fish design and provides examples of its use at McNary and Ice Harbor dams.

Carlson, Thomas J.; Duncan, Joanne P.; Gilbride, Theresa L.; Keilman, Geogre

2004-07-31T23:59:59.000Z

167

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

168

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah...

169

DOE - Office of Legacy Management -- Climax Uranium Co Grand...  

Office of Legacy Management (LM)

Climax Uranium Co Grand Junction Mill - CO 0-03 FUSRAP Considered Sites Site: Climax Uranium Co. (Grand Junction Mill) (CO.0-03) Designated Name: Alternate Name: Location:...

170

Energy Secretary Steven Chu to Attend Grand Opening of Recovery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123...

171

Proposed construction of Priest Rapids Dam in relation to Hanford Works  

DOE Green Energy (OSTI)

This paper summarizes the proposed construction of the Priest Rapids Dam on the Columbia River by the Atomic Energy Commission. Power generation to the Hanford Works and flood control for the surrounding area is the main goal for the construction of the dam. The summary covers the feasibility of the dam from its design, operation, benefits, security, drawbacks, etc.

Smothers, S.A.

1953-01-07T23:59:59.000Z

172

Location-based services to control roller compaction quality for rock-fill dams  

Science Conference Proceedings (OSTI)

It is very important for rock-fill dams to carry out more accurately monitoring and remotely quality controlling in real time. Based on location based services, an integration platform, with the name of CRCQ-DAM, is proposed to control roller compaction ... Keywords: RTK, WebGIS, location-based services, rock-fill dams, roller compaction quality

Hao Wu; Qiankun Wang; Jiru Zhang; Qin Chen; Xupeng Wang

2009-09-01T23:59:59.000Z

173

ANCOLD 2000 Conference on Dams 1 ADVANCES IN THE PRACTICE AND USE OF  

E-Print Network (OSTI)

in 1934, · 200-foot-high by 381-foot-long concrete arch dam, over 500 long with gravity and earth fill Montana Energy Policy Analyst SUBJECT: Briefing on the transfer of Kerr Dam The Confederated Salish and Kootenai Tribes (CSKT) have been the co-licensee for Kerr Dam since 1985. This relationship has been

Bowles, David S.

174

PORTFOLIO RISK ASSESSMENT OF SA WATER'S LARGE DAMS by David S. Bowles1  

E-Print Network (OSTI)

dimensions [5] and high pressure and gravity die-casting [6,7]. Since the two-dimensional dam ridges. Water from the dam flows through the valley and into the sea under gravity. Immediately after-14 December 2001 Three-dimensional modelling of dam-break induced flows using Smoothed Particle Hydrodynamics

Bowles, David S.

175

Investigations into the Early History of Naturally Produced Spring Chinook Salmon in the Grand Ronde Basin : Fish Research Project Oregon : Annual Progress Report Project Period September 1, 1996 to August 31, 1997.  

DOE Green Energy (OSTI)

We have documented two general life history strategies utilized by juvenile spring chinook salmon in the Grande Ronde River basin: (1) juveniles migrate downstream out of summer rearing areas in the fall, overwinter in river valley habitats, and begin their seaward migration in the spring, and (2) juveniles remain in summer rearing areas through the winter and begin seaward migration in the spring. In migration year 96-97, the patterns evident from migrant trap data were similar for the three Grande Ronde River populations studied, with 42% of the Lostine River migrants and 76% of the Catherine Creek migrants leaving upper rearing areas in the fall. Contrary to past years, the majority (98%) of upper Grande Ronde River migrants moved out in the fall. Total trap catch for the upper Grande Ronde River was exceedingly low (29 salmon), indicating that patterns seen this year may be equivocal. As in previous years, approximately 99% of chinook salmon juveniles moved past our trap at the lower end of the Grande Ronde River valley in the spring, reiterating that juvenile chinook salmon overwinter within the Grande Ronde valley section of the river. PIT-tagged fish were recaptured at Grande Ronde River traps and mainstem dams. Recapture data showed that fish that overwintered in valley habitats left as smolts and arrived at Lower Granite Dam earlier than fish that overwintered in upstream rearing areas. Fish from Catherine Creek that overwintered in valley habitats were recaptured at the dams at a higher rate than fish that overwintered upstream. In this first year of data for the Lostine River, fish tagged during the fall migration were detected at a similar rate to fish that overwintered upstream. Abundance estimates for migration year 96-97 were 70 for the upper Grande Ronde River, 4,316 for the Catherine Creek, and 4,323 for the Lostine River populations. Although present in most habitats, juvenile spring chinook salmon were found in the greatest abundance in pool habitats, particularly alcove and backwater pools. These results were consistent for both summer and winter surveys.

Johasson, Brian C.; Tranquilli, J. Vincent; Keefe, MaryLouise

1998-10-28T23:59:59.000Z

176

Enloe Dam Passage Project, Volume I, 1984 Annual Report.  

DOE Green Energy (OSTI)

This report discusses issues related to the provision of fish passage facilities at Enloe Dam and the introduction of anadromous salmonid fish to the upper Similkameen River basin. The species of fish being considered is a summer run of steelhead trout adapted to the upper Columbia basin. (ACR)

Fanning, M.L.

1985-07-01T23:59:59.000Z

177

REVIEW PLAN John Redmond Dam Reservoir, Coffee County, Kansas  

E-Print Network (OSTI)

............................................................................................................1 2. REVIEW MANAGEMENT ORGANIZATION (RMO) COORDINATION Report with Responses to HQ Comments and support for John Redmond Dam and Reservoir, Kansas. (6) CEWSL Statement (HQ Policy Compliance Review). (8) SWT-PE-P Memorandum 29 June 2009; Response to HQ Policy

US Army Corps of Engineers

178

An Analytic Model of Cold Air Damming and Its Applications  

Science Conference Proceedings (OSTI)

It is shown that the geometric shape of the cold dome in the two-layer model of cold air damming of Xu can be described approximately by a cubic polynomial and thus a set of coupled algebraic equations can be derived to quantify the scale and ...

Qin Xu; Shouting Gao

1995-02-01T23:59:59.000Z

179

Effects of the Ben Franklin Dam on the Hanford Site  

DOE Green Energy (OSTI)

A previous assessment of the effects of a Ben Franklin Dam on the Hanford Site made in 1967 was updated so that the potential adverse effects may be better understood in light of existing operations, current environmental and safety standards, and proposed facilities and operations. The major effects would probably arise from flooding of portions of the site by the reservoir associated with the dam and by the raising of the ground water table under the site. A preliminary analysis of the effects of the dam is presented, and a number of studies are recommended in order to fully evaluate and understand these potential impacts. The following seven tasks are identified and discussed: groundwater - hydrology analysis; soil liquefaction analysis; hydrostatic uplift and soil effects on structures; assessment of the potential for landsliding and sloughing; facility decommissioning; hydrothermal analysis; and, meteorological effects. Four other aspects commented upon in this report are: aquatic ecology, terrestrial ecology, socioeconomic effects, and public interaction. Possible effects on ongoing DOE-sponsored R and D are also noted. To the extent possible, cost estimates are developed for corrective actions which must be taken on the Hanford Site to accommodate the dam. Where this was not possible, appropriate courses of action leading to cost estimates are presented.

Harty, H.

1979-04-01T23:59:59.000Z

180

Hydroelectric power potential, Woonsocket Falls Dam, Woonsocket, Rhode Island  

DOE Green Energy (OSTI)

The feasibility of developing a hydroelectric power plant at an existing flood control dam of the city of Woonsocket, RI was examined considering environmental, economic, technical and engineering factors. It was concluded that the City should proceed with plans to develop a hydro plant. (LCL)

Daly, J C; Dowdell, R B; Kelly, W E; Koveos, P E; Krikorian, Jr, J S; Lengyel, G; Prince, M J; Seely, S; Tromp, L; Urish, D W

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

No Van Dam-Veltman-Zakharov Discontinuity in Ads Space  

E-Print Network (OSTI)

We prove that the van Dam-Veltman-Zakharov discontinuity arising in the massless limit of massive gravity theories is peculiar to Minkowski space and it is not present in Anti De Sitter space, where the massless limit is smooth. More generally, the massless limit is smooth whenever the square of the graviton mass vanishes faster than the cosmological constant.

M. Porrati

2000-11-16T23:59:59.000Z

182

EV Everywhere Grand Challenge Kick-Off  

NLE Websites -- All DOE Office Websites (Extended Search)

EV Everywhere Grand Challenge Kick-Off Thursday, June 21, 2012 - Hyatt Regency, Dearborn, MI Event Objective: To showcase existing DOE efforts in vehicle electrification and to obtain stakeholder input on the overall concept of the EV Everywhere Grand Challenge, the high-level strategy, and aggressive next-generation technology development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program 8:35-8:45 AM STRATEGIC SIGNIFICANCE OF PLUG-IN ELECTRIC VEHICLES

183

Grand Ridge Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Grand Ridge Wind Farm Facility Grand Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Location La Salle County IL Coordinates 40.999966°, -88.401693° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.999966,"lon":-88.401693,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

184

Rio Grande pipeline introduces LPG to Mexico  

SciTech Connect

Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

NONE

1997-06-01T23:59:59.000Z

185

Compliance Monitoring of Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2012  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at The Dalles Dam during summer 2012. Under the 2008 Federal Columbia River Power System Biological Opinion, dam passage survival is required to be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal to 0.015. The study also estimated survival from the forebay 2 km upstream of the dam and through the tailrace to 2 km downstream of the dam, forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required by the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Johnson, Gary E.

2013-05-01T23:59:59.000Z

186

Proposed study program of the effects on Hanford of a dam at Columbia River mile 348  

DOE Green Energy (OSTI)

At the request of Hanford Operations Office, Atomic Energy Commission, a study was made of the effects on the Hanford Facilities of a navigation and power dam at Columbia River mile 348, about five miles upstream of the 300 Area. The original study was based on a nominal slack-water pool elevation of 395 to 400 feet at the dam location. A supplemental study evaluated the effects on plant facilities of a dam at the same location but with slack-water pool elevation of 385 feet. In addition to effects of the dam on Hanford, a study was performed to evaluate the effects the dam would have on the environment.

Jasko, R.T.

1959-06-30T23:59:59.000Z

187

A review of proposed Glen Canyon Dam interim operating criteria  

DOE Green Energy (OSTI)

Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

1992-04-01T23:59:59.000Z

188

10 Questions for a Computational Scientist: Kerstin Kleese-Van Dam |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a Computational Scientist: Kerstin Kleese-Van Dam a Computational Scientist: Kerstin Kleese-Van Dam 10 Questions for a Computational Scientist: Kerstin Kleese-Van Dam June 9, 2011 - 4:35pm Addthis Kerstin Kleese-Van Dam Kerstin Kleese-Van Dam Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs Science gave me the opportunity to contribute to addressing some of society's big challenges - climate change, environmental remediation, sustainable clean energy and secure power. Kerstin Kleese-Dam, Computational Scientist Meet Kerstin Kleese-Van Dam. At Pacific Northwest National Lab, she's a master of computers and data - covering a wide span of projects from genomic sciences and climate change to nanometer-scale imaging and power grids. She recently spent some time to give us the download on her many

189

Agropecuaria e Industrial Serra Grande | Open Energy Information  

Open Energy Info (EERE)

Agropecuaria e Industrial Serra Grande Agropecuaria e Industrial Serra Grande Jump to: navigation, search Name Agropecuaria e Industrial Serra Grande Place São Raimundo das Mangabeiras, Maranhao, Brazil Product Privately owned Brazil based ethanol producer, located in the state of Maranhao. References Agropecuaria e Industrial Serra Grande[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Agropecuaria e Industrial Serra Grande is a company located in São Raimundo das Mangabeiras, Maranhao, Brazil . References ↑ "[ Agropecuaria e Industrial Serra Grande]" Retrieved from "http://en.openei.org/w/index.php?title=Agropecuaria_e_Industrial_Serra_Grande&oldid=341914" Categories:

190

Dam Construction and Maintenance (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction and Maintenance (Minnesota) Construction and Maintenance (Minnesota) Dam Construction and Maintenance (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Program Info State Minnesota Program Type Siting and Permitting Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may also choose to

191

Turbocharger with sliding piston, and having vanes and leakage dams  

Science Conference Proceedings (OSTI)

A turbocharger having a sliding piston for regulating exhaust gas flow into the turbine wheel includes a set of first vanes mounted on a fixed first wall of the turbine nozzle and projecting axially toward an opposite second wall of the nozzle, and/or a set of second vanes mounted on the end of the piston and projecting in an opposite axial direction toward the first wall of the nozzle. For the/each set of vanes, there are leakage dams formed on the wall that is adjacent the vane tips when the piston is closed. The leakage dams are closely adjacent the vane tips and discourage exhaust gas from leaking in a generally radial direction past the vane tips as the piston just begins to open from its fully closed position.

Roberts, Quentin (Nancy, FR); Alnega, Ahmed (Thaon Les Vosges, FR)

2011-12-06T23:59:59.000Z

192

Rock Island Dam Smolt Monitoring; 1994-1995 Annual Report.  

DOE Green Energy (OSTI)

Downstream migrating salmon and steelhead trout (Oncorhynchus spp.) smolts were monitored at the Rock Island Dam bypass trap from April 1 - August 31, 1954. This was the tenth consecutive year that the bypass trap was monitored. Data collected included: (1) number of fish caught by species, (2) number of adipose clipped and/or Passive Integrated Transponder (PIT) tagged fish caught by species, (3) daily average riverflow, (4) daily average powerhouse No. 1 and No. 2 flows and daily average spill. These data were transmitted to the Fish Passage Center, which manages the Smolt Monitoring Program throughout the Columbia River Basin. The Smolt Monitoring Program is used to manage the {open_quotes}water budget{close_quotes}, releasing upstream reservoir water storage allocated to supplement river flows to enhance survival of downstream migrating juvenile salmonids. The Rock Island Dam trapping facility collected 37,795 downstream migrating salmonids in 1994. Collected fish included 4 yearling and 4 sub-yearling chinook salmon (O. tshawytscha) that had been previously PIT tagged to help determine migration rates. Additionally, 1,132 sub-yearling chinook, 4,185 yearling chinook, 6,627 steelhead, (O. mykiss) and 422 sockeye (O. nerka) with clipped adipose fins were collected. The middle 80% of the 1994 spring migration (excluding sub-yearling chinooks) passed Rock Island Dam during a 34 day period, April 25 - May 28. Passage rates of chinook and steelhead smolts released from hatcheries and the downstream migration timing of all salmonids are presented. The spring migration timing of juvenile salmonids is strongly influenced by hatchery releases above Rock Island Dam.

Truscott, Keith B.; Fielder, Paul C. (Chelan County Public Utility District No. 1, Power Operations Department, Wenatchee, WA)

1995-10-01T23:59:59.000Z

193

Dam Removal Decisions: Science and Decision-Making  

Science Conference Proceedings (OSTI)

This report is the result of a two-year collaborative effort partially supported by EPRI and managed by the Heinz Center for Science, Economics, and the Environment. Other project supporters included FEMA, the Department of the Interior, the Army Corps of Engineers, and nongovernmental environmental organizations. The report concludes that dams continue to be extremely important to our nation's infrastructure by providing water supply, flood protection, hydroelectric power production, and recreation. How...

2002-05-04T23:59:59.000Z

194

Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

2005-12-22T23:59:59.000Z

195

Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2002  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct fish-passage studies at Bonneville Dam in 2002. The ERDC contracted with MEVATEC Corporation to provide staff ranging from scientists to technicians to help conduct the study. This study supports the Portland-District goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. In this report, we present results of two studies of juvenile salmonid passage at Bonneville Dam that we carried out in the 2002 downstream passage season April 20 through July 15, 2002. The first study of Project-wide FPE provides hourly estimates of fish passage and associated variances for all operating turbine units, spill bays, and the two sluiceway entrances at Powerhouse 1 (B1), as well as estimates of a variety of fish-passage efficiency and effectiveness measures. This was the third consecutive year of full-project hydroacoustic sampling and passage estimation. The second study was more narrowly focused on B2 turbines and had two components: (1) to sample the FGE at two modified turbine intakes and compare them with efficiencies of other B2 units that were sampled in the first study, and (2) to evaluate proportions of fish passing up into gatewell slots versus through screen gaps at a few B2 turbine intakes.

Ploskey, Gene R. (BATTELLE (PACIFIC NW LAB)); Schilt, Carl R. (MEVATEC); Kim, J (Lynntech); Escher, Charles (MEVATEC Corporation); Skalski, John R.

2003-08-15T23:59:59.000Z

196

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2007 Annual Report.  

DOE Green Energy (OSTI)

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.

Garcia, A.P.; Bradbury, S. [U.S. Fish and Wildlife Service; Arnsberg, B.D. [Nez Perce Tribe; Groves, P.A. [Idaho Power Company

2008-11-25T23:59:59.000Z

197

EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Grande Ronde Basin Endemic Spring Chinook Salmon 3: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon SUMMARY This EA evaluates the environmental impacts for the U.S. Department of Energy Bonneville Power Administration's proposal to fund a program designed to prevent the extinction and begin the recovery of spring Chinook salmon stocks in the Grande Ronde River Basin in the Upper Grande Ronde River, Lostine River, and Catherine Creek in Northeastern Oregon. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 18, 2003 EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program

198

City of Grand Rapids - Green Building Requirements for Municipal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement...

199

DOE - Office of Legacy Management -- Grand Junction Sites  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

200

Statement by Energy Secretary Steven Chu on Today's Grand Opening...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu issued the following statement on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. The facility was supported with funding from the...

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Rio Grande Rift Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Rift Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Rio Grande Rift Geothermal Region edit Details Areas (21) Power Plants (0) Projects (2)...

202

SunShot Grand Challenge Highlights Ambitious Efforts along the...  

NLE Websites -- All DOE Office Websites (Extended Search)

startups. Secretary Chu also announced a nationwide competition to drive down the cost of rooftop solar energy system. The SunShot Grand Challenge: Summit and Technology Forum...

203

City of Grand Rapids- Green Building Requirements for Municipal Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement the principles...

204

Compliance Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2010  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon smolts at The Dalles Dam during summer 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 2 km below the dam The forebay-to-tailrace survival estimate satisfies the BRZ-to-BRZ survival estimate called for in the Fish Accords. , as well as the forebay residence time, tailrace egress time, and spill passage efficiency, as required in the Columbia Basin Fish Accords. The estimate of dam survival for subyearling Chinook salmon at The Dalles in 2010 was 0.9404 with an associated standard error of 0.0091.

Johnson, Gary E.; Carlson, Thomas J.; Skalski, John R.

2010-12-21T23:59:59.000Z

205

Investigations into the [Early] Life History of Spring Chinook Salmon in the Grande Ronde River Basin : Fish Research Project, Oregon : Annual Report 1994 : Project Period 1 June 1993 to 31 May 1994.  

DOE Green Energy (OSTI)

This study was designed to describe aspects of the life history strategies of spring chinook salmon in the Grande Ronde basin. During the past year we focused on rearing and migration patterns of juveniles and surveys of spawning adults. The specific objectives for the early life history portion of the study were: Objective 1, document the annual in-basin migration patterns for spring chinook salmon juveniles in the upper Grande Ronde River, including the abundance of migrants, migration timing and duration; Objective 2, estimate and compare smolt survival indices to mainstem Columbia and Snake River dams for fall and spring migrating spring chinook salmon; Objective 3 initiate study of the winter habitat utilized by spring chinook salmon in the Grande Ronde River basin. The specific objectives for the spawning ground surveys were: Objective 4, conduct extensive and supplemental spring chinook salmon spawning ground surveys in spawning streams in the Grande Ronde and Imnaha basin, Objective 5; determine how adequately historic index area surveys index spawner abundance by comparing index counts to extensive and supplemental redd counts; Objective 6, determine what changes in index areas and timing of index surveys would improve the accuracy of index surveys; Objective 7, determine the relationship between number of redds observed and fish escapement for the Grande Ronde and Imnaha river basins.

Keefe, MaryLouise

1996-04-01T23:59:59.000Z

206

The Conscious Landscape: Reinterpreting and Reinhabiting the La Colle Falls Hydro Dam.  

E-Print Network (OSTI)

??The ruins of the La Colle Falls Hydro Dam encompass two very distinct topographies: the physical landscape of the vast Canadian Northwest, and the complex (more)

Hurd, Jason John

2007-01-01T23:59:59.000Z

207

Vehicle Technologies Office: EV Everywhere Grand Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

Challenge Challenge With their immense potential for increasing the country's energy, economic, and environmental security, plug-in hybrid electric and all-electric vehicles (also known as plug-in electric vehicles, or PEVs) will play a key role in the country's transportation future. In fact, transitioning to electric drive vehicles (including hybrid-electric) could reduce U.S. oil dependence by more than 80% and greenhouse gas emissions by more than 60%. The EV Everywhere Grand Challenge focuses on the U.S. becoming the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years. To learn more about electric vehicles, see our Plug-in Electric Vehicle Basics page. To help meet the EV Everywhere goals, the Vehicle Technologies Office supports efforts in a variety of areas:

208

Grand Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Electric Coop, Inc Electric Coop, Inc Jump to: navigation, search Name Grand Electric Coop, Inc Place South Dakota Utility Id 7484 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Heat Rate Commercial Farm and Residential Electric Heat Rate Residential Metered Security Light - 100 HPS Lighting Metered Security Light - 175 MV Lighting Metered Security Light - 250 HPS Lighting Metered Security Light - 400 MV Lighting Schedule A - Farm and Residential Residential Schedule ADF -Du al Fuel Service Residential

209

Panel on grand challenges for modeling and simulation  

Science Conference Proceedings (OSTI)

It has been a decade since the Workshop on Grand Challenge for Modeling & Simulation (M&S) was held at Dagstuhl in Germany (www.dagstuhl.de/02351). Grand challenges provide a critical focal point for research and development and can potentially create ...

Simon J. E. Taylor; Richard Fujimoto; Ernest H. Page; Paul A. Fishwick; Adelinde M. Uhrmacher; Gabriel Wainer

2012-12-01T23:59:59.000Z

210

Slide 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N N Federal Transmission Expansion in the West DOE Tribal Leader Forum: Transmission and Clean Energy Development in the West February 7-8, 2012 Denver, Colorado Bill Drummond Deputy Administrator Bonneville Power Administration B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental Little Goose John Day The Dalles Minidoka Lower Granite Chandler Rosa Albeni Falls Black Canyon Boise Diversion Mica Keenleyside Duncan BPA Service Area Columbia Basin Federal Dams: Canadian Dams Montana Wyoming Utah Nevada California Oregon Idaho Washington

211

EA-0307-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-SA-01: Supplement Analysis 7-SA-01: Supplement Analysis EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis The Bonneville Power Administration prepared an Environmental Assessment (EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a resident trout hatchery on the Colville Indian Reservation to partially mitigate for anadromours and other fish losses resulting from the the construction and operation of the Chief Joseph Dam and Grand Coulee Dam hydroelectric projects. Colville Resident Trout Hatchery Project Supplement Analysis

212

Annual Report on Wildlife Activities, September 1985-April 1986, Action Item 40.1, Columbia River Basin Fish and Wildlife Program.  

DOE Green Energy (OSTI)

This annual report addresses the status of wildlife projects Bonneville Power Administration (BPA) has implemented from September 1985 to April 1986. This report provides a brief synopsis, review, and discussion of wildlife activities BPA has undertaken. BPA's effort has gone towards implementing wildlife planning. This includes measure 1004 (b)(2), loss statements and measure 1004 (b)(3), mitigation plans. Loss statements have been completed for 14 facilities in the Basin with 4 additional ones to be completed shortly. Mitigation plans have been completed for 5 hydroelectric facilities in Montana. The Northwest Power Planning Council is presently considering two mitigation plans (Hungry Horse and Libby) for amendment into the Program. Currently, mitigation plans are being prepared for the 8 Federal hydroelectric facilities in the Willamette River Basin in Oregon, Grand Coulee Dam in the state of Washington, and Palisades Dam on the Snake River in Idaho.

United States. Bonneville Power Administration.

1986-04-01T23:59:59.000Z

213

The Particle Adventure | Unsolved Mysteries | Forces and the Grand Unified  

NLE Websites -- All DOE Office Websites (Extended Search)

Unsolved Mysteries - Forces and the Grand Unified Theory Unsolved Mysteries - Forces and the Grand Unified Theory Forces and the Grand Unified Theory Physicists hope that a Grand Unified Theory will unify the strong, weak, and electromagnetic interactions. There have been several proposed Unified Theories, but we need data to pick which, if any, of these theories describes nature. If a Grand Unification of all the interactions is possible, then all the interactions we observe are all different aspects of the same, unified interaction. However, how can this be the case if strong and weak and electromagnetic interactions are so different in strength and effect? Strangely enough, current data and theory suggests that these varied forces merge into one force when the particles being affected are at a high enough energy.

214

Grand Challenges | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Grand Challenges Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Basic Research Needs Grand Challenges Science Highlights News & Events Publications Contact BES Home Research Grand Challenges Print Text Size: A A A RSS Feeds FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored workshops that began in 2001. Over and over, the recommendations from these workshops described similar themes that in this new era of science, we would design, discover, and synthesize new materials and molecular assemblies through atomic scale control; probe and control photon, phonon, electron, and ion interactions

215

Dam Safety Rules (West Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Rules (West Virginia) Safety Rules (West Virginia) Dam Safety Rules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State West Virginia Program Type Safety and Operational Guidelines Provider Department of Environmental Protection This establishes requirements relating to the design, placement, construction, enlargement, alteration, removal, abandonment, and repair of

216

Water quality and sedimentation implications of installing a hydroelectric dam on the Ro Baker in Chilean Patagonia  

E-Print Network (OSTI)

HidroAysen, a Chilean corporation operated by energy giant Endesa, has proposed to build two hydroelectric dams on the Rio Baker in the Aysin Region of Chilean Patagonia. The proposed dams have been met with a variety of ...

Leandro, Gianna Dee

2009-01-01T23:59:59.000Z

217

NOAA's Rapid Response to the Howard A. Hanson Dam Flood Risk Management Crisis  

Science Conference Proceedings (OSTI)

The Howard A. Hanson Dam (HHD) has brought flood protection to Washington's Green River Valley for more than 40 years and opened the way for increased valley development near Seattle. However, following a record high level of water behind the dam in ...

Allen B. White; Brad Colman; Gary M. Carter; F. Martin Ralph; Robert S. Webb; David G. Brandon; Clark W. King; Paul J. Neiman; Daniel J. Gottas; Isidora Jankov; Keith F. Brill; Yuejian Zhu; Kirby Cook; Henry E. Buehner; Harold Opitz; David W. Reynolds; Lawrence J. Schick

2012-02-01T23:59:59.000Z

218

Mangla Dam Raising Project (Pakistan): General Review and Socio-Spatial Impact Assessment  

E-Print Network (OSTI)

Mangla Dam Raising Project (Pakistan): General Review and Socio-Spatial Impact Assessment Saheeb, National University of Sciences and Technology, Islamabad-44000, Pakistan saheebk@ceme.nust.edu.pk Abstract. INTRODUCTION Pakistan has recently successfully completed the raising of Mangla dam, a major water works system

Paris-Sud XI, Université de

219

Van Dam-Veltman-Zakharov discontinuity in topologically new massive gravity  

E-Print Network (OSTI)

We study van Dam-Veltman-Zakharov discontinuity in the topologically new massive gravity (TNMG). The reduction from 2 degrees of freedom to one is interpreted as van Dam-Veltman-Zakharov discontinuity appeared when going from anti-de Sitter spacetime to Minkowski spacetime in the linearized TNMG.

Yun Soo Myung

2012-12-31T23:59:59.000Z

220

Effect of Flow Pulses on Degradation Downstream of Hapcheon Dam, South Korea  

E-Print Network (OSTI)

and the vertical and horizontal mixing of dye as the fluid slumps under gravity immediately after removal of dam gravity numerical model initialized with a finite length dammed region and periodic boundary conditions (reduced gravity = g , Coriolis parameter = f) propagating alongshore (y = 0). The potential vorticity q

Julien, Pierre Y.

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-A and PP-33-1 Rio Grande Electric Cooperative, Inc. EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. Order authorizing Rio Grande Electric Cooperative, Inc to export...

222

PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS  

DOE Green Energy (OSTI)

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

2012-07-01T23:59:59.000Z

223

Hungry Horse Dam Fisheries Mitigation; Aquatic Modeling of the Selective Withdrawal System, Hungry Horse Dam, Montana, 1991-1993 Technical Report.  

DOE Green Energy (OSTI)

Hungry Horse Dam presently releases frigid water from the bottom of the reservoir all year long. Cold water effects insect production and fish growth downstream. Rapid temperature changes of up to 8.3 C (14 F) have been measured in the Flathead River downstream of the South Fork confluence, controlled by dam discharges. Thermal effects from Hungry Horse Dam are detectable for over 64 Km downstream to Flathead Lake. The installation of a selective withdrawal structure on each of the dam`s discharge penstocks was determined to be the most cost-effective means to provide constant, permanent temperature control without impacting power production and flexibility in dam operation. The thermal model presented herein revealed that fish growth potential in the river would increase two to five times through selective withdrawal, temperature control. Temperature control is possible over the entire range of turbine discharge capacity, with very little effect on power production. Findings indicate that angling would improve through higher catch rates and larger fish. Temperature control will solve the most serious impact to river health. However, flow fluctuations will continue to effect insect production and usable fishery habitat in the Flathead River. A natural thermal regime combined with moderated flow fluctuation would further enhance riverine food production, trout growth and recreation potential.

Marotz, Brian L.; Althen, Craig; Gustafson, Daniel

1994-04-01T23:59:59.000Z

224

CRFLOOD: A Numerical Model to Estimate Uplift Pressure Distribution in Cracks in Concrete Gravity Dams: Volume 4  

Science Conference Proceedings (OSTI)

Uplift pressure forms an overturning force on dams that must be minimized so that dams can meet the required safety factors. CRFLOOD is a PC code that permits evaluation of different drain designs by selecting suitable combinations of drain diameter, spacing, and location for specific dam conditions.

1992-11-26T23:59:59.000Z

225

Estimating Overall Risk of Dam Failure: Practical Considerations in Combining Failure Probabilities ANCOLD 2003 Risk Workshop Page 1  

E-Print Network (OSTI)

% 80% 90% 100% M N P Q R P AP ANP NP DAM: D E F G H - - - Flood Concrete Gravity Section Under drainDAM SAFETY DECISION-MAKING: COMBINING ENGINEERING ASSESSMENTS WITH RISK INFORMATION David S. Bowles breaching a dam; so drop the matter before a dispute breaks out. Proverbs 17:14 (NIV) ABSTRACT A decision

Bowles, David S.

226

Data Compendium for the Logging Test Pits at the ERDA Grand Junction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound (December 1975) Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound...

227

Thermomechanical models of the Rio Grande rift  

SciTech Connect

Fully two-dimensional, coupled thermochemical solutions of a continental rift and platform are used to model the crust and mantle structure of a hot, buoyant mantle diapir beneath the Rio Grande rift. The thermomechanical model includes both linear and nonlinear laws of the Weertman type relating shear stress and creep strain rate, viscosity which depends on temperature and pressure, and activation energy, temperature-dependent thermal conductivity, temperature-dependent coefficient of thermal expansion, the Boussinesq approximation for thermal bouyancy, material convection using a stress rate that is invariant to rigid rotations, an elastically deformable crust, and a free surface. The model determines the free surface velocities, solid state flow field in the mantle, and viscosity structure of lithosphere and asthenosphere. Regional topography and crustal heat flow are simulated. A suite of symmetric models, assumes continental geotherms on the right and the successively increasing rift geotherms on the left. These models predict an asthenospheric flow field which transfers cold material laterally toward the rift at > 300 km, hot, buoyant material approx. 200 km wide which ascends vertically at rates of 1 km/my between 175 to 325 km, and spreads laterally away from the rift at the base of the lithosphere. Crustal spreading rates are similar to uplift rates. The lithosphere acts as stiff, elastic cap, damping upward motion through decreased velocities of 1 km/10 my and spreading uplift laterally. A parameter study varying material coefficients for the Weertman flow law suggests asthenospheric viscosities of approx. 10/sup 22/ to 10/sup 23/ poise. Similar studies predict crustal viscosities of approx. 10/sup 25/ poise. The buoyant process of mantle flow narrows and concentrates heat transport beneath the rift, increases upward velocity, and broadly arches the lithosphere. 10 figures, 1 table.

Bridwell, R.J.; Anderson, C.A.

1980-01-01T23:59:59.000Z

228

Simulations of The Dalles Dam Proposed Full Length Spillwall  

DOE Green Energy (OSTI)

This report presents results of a computational fluid dynamics (CFD) modeling study to evaluatethe impacts of a full-length spillwall at The Dalles Dam. The full-length spillwall is being designed and evaluated as a structural means to improve tailrace egress and thus survival of juvenile fish passing through the spillway. During the course of this study, a full-length spillwall at Bays 6/7 and 8/9 were considered. The U.S. Army Corps of Engineers (USACE) has proposed extending the spillwall constructed in the stilling basin between spillway Bays 6 and 7 about 590 ft farther downstream. It is believed that the extension of the spillwall will improve egress conditions for downstream juvenile salmonids by moving them more rapidly into the thalweg of the river hence reducing their exposure to predators. A numerical model was created, validated, and applied the The Dalles Dam tailrace. The models were designed to assess impacts to flow, tailrace egress, navigation, and adult salmon passage of a proposed spill wall extension. The more extensive model validation undertaken in this study greatly improved our confidence in the numerical model to represent the flow conditions in The Dalles tailrace. This study used these validated CFD models to simulate the potential impacts of a spillwall extension for The Dalles Dam tailrace for two locations. We determined the following: (1)The construction of an extended wall (between Bays 6/7) will not adversely impact entering or exiting the navigation lock. Impact should be less if a wall were constructed between Bays 8/9. (2)The construction of a wall between Bays 6/7 will increase the water surface elevation between the wall and the Washington shore. Although the increased water surface elevation would be beneficial to adult upstream migrants in that it decreases velocities on the approach to the adult ladder, the increased flow depth would enhance dissolved gas production, impacting potential operations of the project because of water quality. A wall between Bays 8/9 should have a lesser impact as the confined spill would be across more bays and the relative flow constriction less. (3) The 405 kcfs case was used for the rapid assessment of flow conditions and hydraulic mechanisms that might be responsible for the unexpected erosion at the end of the shelf downstream of Bay 7.

Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

2008-02-25T23:59:59.000Z

229

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

Science Conference Proceedings (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

230

DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awardees for the Industrial Energy Efficiency Grand Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational industrial processes and technologies that can significantly reduce greenhouse gas emissions throughout the industrial sector. The funding will be matched by more than $5 million in private industry funding to support a total of $18 million in projects that will enhance America's energy security and strengthen our economy.

231

Grand Blanc Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Grand Blanc Generating Station Biomass Facility Grand Blanc Generating Station Biomass Facility Jump to: navigation, search Name Grand Blanc Generating Station Biomass Facility Facility Grand Blanc Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

232

EA-1037: Uranium Lease Management Program, Grand Junction, Colorado |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Uranium Lease Management Program, Grand Junction, Colorado 37: Uranium Lease Management Program, Grand Junction, Colorado EA-1037: Uranium Lease Management Program, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of domestic uranium and vanadium ores, to maintain a viable domestic mining and milling infrastructure required to produce and mill these ores, and to provide assurance of a fair monetary return to the U.S. Government. The Uranium Lease Management Program gives The Department of Energy the flexibility to continue leasing these lands. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 22, 1995

233

DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awardees for the Industrial Energy Efficiency Grand Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational industrial processes and technologies that can significantly reduce greenhouse gas emissions throughout the industrial sector. The funding will be matched by more than $5 million in private industry funding to support a total of $18 million in projects that will enhance America's energy security and strengthen our economy.

234

SunShot Grand Challenge Summit 2014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Grand Challenge Summit 2014 SunShot Grand Challenge Summit 2014 SunShot Grand Challenge Summit 2014 May 19, 2014 8:00AM PDT to May 22, 2014 5:00PM PDT Anaheim, California Hilton Anaheim The DOE SunShot Initiative Grand Challenge Summit 2014 will bring together more than 800 members of the solar community including SunShot-funded project teams, industry leaders, innovative researchers and scientists, and local, state and federal government policymakers to review the progress made and discuss the challenges ahead to make solar energy more affordable and widespread across America. The event will include activities that celebrate the accomplishments across more than 250 SunShot-funded projects and discuss the path forward for the U.S. solar energy industry. Plenary Sessions and Keynote Speakers - Top leaders from business,

235

Saft America Advanced Batteries Plant Celebrates Grand Opening in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Saft America Advanced Batteries Plant Celebrates Grand Opening in Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 - 12:30pm Addthis Department of Energy Investment Helps Support Job Creation, U.S. Economic Competitiveness and Advanced Vehicle Industry WASHINGTON, D.C. - Today, Secretary Steven Chu joined with Saft America to announce the grand opening of the company's Jacksonville, Florida, factory, which will produce advanced lithium-ion batteries to power electric vehicles and other applications. Saft America estimates it will create nearly 280 permanent jobs at the factory, and the city of Jacksonville expects an additional 800 indirect jobs to be created within its community. The project has created or preserved an estimated 300

236

Alpine Extensional Detachment Tectonics In The Grande Kabylie Metamorphic  

Open Energy Info (EERE)

Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Alpine Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Details Activities (0) Areas (0) Regions (0) Abstract: The Maghrebides are part of the peri-Mediterranean Alpine orogen. They expose in their inner zone inliers of high-grade crystalline rocks surrounded by Oligo-Miocene and younger Miocene cover. Detailed mapping coupled with structural and petrological investigations in the Grande Kabylie massif, and the reinterpretation of the available geochronological data, allow us to refute the traditional concept of rigid behaviour of this

237

Empowering First Year Students by Immersion in a 'Grand Challenges'  

Science Conference Proceedings (OSTI)

Apr 19, 2010 ... Interestingly, this preceded the National Academy of Engineering Grand ... Within their lifetime they will witness burgeoning needs in energy resources, ... to statistics, environmental studies, to history and philosophyin...

238

SunShot Grand Challenge Highlights Ambitious Efforts along the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Chu also announced a nationwide competition to drive down the cost of rooftop solar energy system. The SunShot Grand Challenge: Summit and Technology Forum kicked off in...

239

Vehicle Technologies Office: EV Everywhere Grand Challenge: DOE...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE's 10-Year Vision for Plug-in Electric Vehicles to someone by E-mail Share Vehicle Technologies Office: EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in...

240

Wintertime Boundary Layer Structure in the Grand Canyon  

Science Conference Proceedings (OSTI)

Wintertime temperature profiles in the Grand Canyon exhibit a neutral to isothermal stratification during both daytime and nighttime, with only rare instances of actual temperature inversions. The canyon warms during daytime and cools during ...

C. David Whiteman; Shiyuan Zhong; Xindi Bian

1999-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Cambridge Grand Junction transit implementation : alternatives, scheduling, cost, and performance  

E-Print Network (OSTI)

The Grand Junction railroad lies at the heart of East Cambridge adjacent to the Kendall Square business district and the Massachusetts Institute of Technology campus. Over the last one hundred years the railroad has gone ...

Iglesias Cuervo, Jesus

2012-01-01T23:59:59.000Z

242

EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Facility Operations at the U.S. DOE Grand Junction 30: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD June 8, 1996 EA-0930: Finding of No Significant Impact Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand

243

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

Science Conference Proceedings (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

244

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

245

Dam Control and Safety Act (West Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Control and Safety Act (West Virginia) Control and Safety Act (West Virginia) Dam Control and Safety Act (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State West Virginia Program Type Safety and Operational Guidelines Provider Department of Environmental Protection This law grants authority to the secretary of the Department of Environmental Protection to control and exercise regulatory jurisdiction

246

Lower Granite Dam Smolt Monitoring Program, 1999 Annual Report.  

DOE Green Energy (OSTI)

The 1999 fish collection season at Lower Granite was characterized by high spring flows and spill, low levels of debris, cool water temperatures, increased hatchery chinook numbers, and an overall decrease in numbers of smolts collected and transported. A total of 5,882,872 juvenile salmonids were collected at Lower Granite. Of these, 5,466,057 were transported to release sites below Bonneville Dam, 5,232,105 by barge and 233,952 by truck. An additional 339,398 fish were bypassed back to the river. A total of 117,609 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 440,810 smolts (7.5% of the total collected) of which 247,268 were PIT tagged and 572 were recorded as incidental mortalities.

Verhey, Peter; Morrill, Charles; Mensik, Fred

1999-01-01T23:59:59.000Z

247

Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.  

DOE Green Energy (OSTI)

In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull trout redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.

DosSantos, Joe; Vashro, Jim; Lockard, Larry

1994-06-01T23:59:59.000Z

248

Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010  

Science Conference Proceedings (OSTI)

The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

249

Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010  

DOE Green Energy (OSTI)

The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

250

Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.  

DOE Green Energy (OSTI)

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlings at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of the 1,253 PIT tagged fish released, a total of 719 unique tags were detected at mainstem Snake and Columbia River dams. A total of 2,420 yearlings were PIT tagged and released at Lyons Ferry Hatchery. PIT tagged yearlings had a mean fork length of 159.0 mm and mean condition factor of 1.10. Of the 2,420 PIT tagged fish released, a total of 979 unique tags were detected at mainstem Snake and Columbia River dams (Lower Monumental and McNary). Median travel times, based on all detections, of PIT tagged fish released from Pittsburg Landing were 10.5 days to Lower Granite Dam, 21.7 days to McNary Dam and 29.8 days to Bonneville Dam. Median migration rates were 16.4 rkm/d to Lower Granite Dam, 18.3 rkm/d to McNary Dam and 18.9 rkm/d to Bonneville Dam. The median arrival dates were April 25 at Lower Granite Dam, May 6 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 5 at Lower Granite Dam, May 20 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 9.5 fpp yearlings released from Big Canyon were 13.3 days to Lower Granite Dam, 26.0 days to McNary Dam and 30.8 days to Bonneville Dam. Median migration rates were 13.0 rkm/d to Lower Granite Dam, 15.3 rkm/d to McNary Dam and 18.3 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Granite Dam, May 11 at McNary Dam and May 15 at Bonneville Dam. The 90% passage dates were May 9 at Lower Granite Dam, May 24 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 30 fpp yearlings released from Big Canyon were 20.8 days to Lower Granite Dam, 37.6 days to McNary Dam and 43.5 days to Bonneville Dam. Median migration rates were 8.3 rkm/d to Lower Granite Dam, 10.6 rkm/d to McNary Dam and 12.9 rkm/d to Bonneville Dam. The median arrival dates were May 5 at Lower Granite Dam, May 23 at McNary Dam and May 28 at Bonneville Dam. The 90% passage dates were May 22 at Lower Granite Dam, May 31 at McNary Dam and June 5 at Bonneville Dam. Median arrival dates, based on all detections, of PIT tagge

Rocklage, Stephen J. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2004-01-01T23:59:59.000Z

251

Water-Power Development, Conservation of Hydroelectric Power Dams and Works  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water-Power Development, Conservation of Hydroelectric Power Dams Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Systems Integrator Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Virginia Program Type Siting and Permitting Provider Virginia State Corporation Commission It is the policy of the Commonwealth of Virginia to encourage the utilization of its water resources to the greatest practicable extent, to control the waters of the Commonwealth, and also to construct or reconstruct dams in any rivers or streams within the Commonwealth for the

252

Precipitation Changes near Three Gorges Dam, China. Part I: A Spatiotemporal Validation Analysis  

Science Conference Proceedings (OSTI)

In October 2010, the water level upstream of the Three Gorges Dam (TGD) reached the designated 175-m level. The associated inundation and land useland cover changes have important implications for water resource management, agriculture, ...

Fang Zhao; Marshall Shepherd

2012-04-01T23:59:59.000Z

253

Investigation of Uplift Pressures and Shear and Tensile Strengths for Concrete Gravity Dams  

Science Conference Proceedings (OSTI)

Concrete gravity dam stability depends on the characteristics of the rock foundation, strength of the concrete-to-rock bond, concrete strength, and uplift pressure forces. This interim report describes, with examples, how to assess these factors.

1990-12-17T23:59:59.000Z

254

Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010  

SciTech Connect

The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

2012-11-15T23:59:59.000Z

255

Update of Columbia River flow and temperature data measured at Priest Rapids Dam and Vernita Bridge  

DOE Green Energy (OSTI)

Columbia River temperatures and flow rates are collected daily at Priest Rapids Dam and Vernita Bridge. These data are necessary for assessing trends or changes in river conditions downstream of Priest Rapids Dam. In order to analyze this data, Pacific Northwest Laboratory developed a computerized data base using existing US Geological Survey flow and temperature records at Priest Rapids Dam and Vernita Bridge. Daily-averaged temperature and daily flow information on the Columbia River just downstream of Priest Rapids Dam and upstream of river mile 380 were collected and stored in a data base. A newly developed computer model, COLSTAT (Columbia River Statistical Update), used the data base to statistically analyze temperature and flow conditions by computing the frequency of occurrence and duration of selected temperatures and flow rates for the Columbia River. Information regarding the data base is presented, as well as, a description of the COLSTAT model.

Whelan, G.; Newbill, C.A.

1983-09-01T23:59:59.000Z

256

Surface and subsurface soils at the Pond B dam: July 1998  

Science Conference Proceedings (OSTI)

Pond B, 685-13G, is an inactive reactor cooling impoundment built in 1961 on the Savannah River Site (SRS). Between 1961 and 1964, Pond B received R-Reactor cooling water discharges that were contaminated with {sup 137}Cs, {sup 90}Sr and plutonium. Though the pond has not been used since 1964, radionuclides from the contaminated cooling water remain in the water and in the surface sediments of the pond. The current proposal to fix and repair the Pond B dam structure includes installing a new drain system and monitoring equipment. The dam will be reinforced with additional previous material on the downstream face of the dam. The objectives of this report are to describe the sampling methodology used during the July 1998 sampling event at the downstream face of the Pond B dam and in Pond B, present the results of the sampling event, and compare, where possible, these results to related risk-based standards.

Halverson, N.V.

1999-12-03T23:59:59.000Z

257

Acoustic Doppler Current Profiler Surveys of Velocity Downstream of Albeni Falls Dam  

DOE Green Energy (OSTI)

The U.S. Army Corps of Engineers (USACE), Seattle District, is studying the potential to locate fish bypass systems at Albeni Falls Dam. The USACE requested Pacific Northwest National Laboratory (PNNL) to survey velocity magnitude and direction in the dam tailrace. The empirical data collected will be used to support future numerical modeling, physical modeling, and evaluation of fish bypass system alternatives. In May 2010, PNNL conducted velocity surveys of the Albeni Falls Dam using a boat-mounted acoustic Doppler current profiler. The surveys were conducted over three days (May 25 through 27). During the survey period, total river discharge at the dam varied between 30.2 and 31.0 kcfs. A small amount of spill discharge, 2 kcfs, was present on two days (May 26 and 27). This report presents data plots showing measured velocity direction and magnitude averaged over the entire depth and over 5-ft depth increments from 5 to 30 ft.

Perkins, William A.; Titzler, P. Scott; Richmond, Marshall C.; Serkowski, John A.; Kallio, Sara E.; Bellgraph, Brian J.

2010-09-30T23:59:59.000Z

258

Association of State Dam Safety Officials (ASDSO)/EPRI Spillway Gate Workshop: January 5 & 6, 2000  

Science Conference Proceedings (OSTI)

Maintaining the integrity of dams at hydroelectric projects is essential to the protection of communities, the surrounding environment, and the power and resource management infrastructure. The Spillway Gate Workshop, sponsored by the Association of State Dam Safety Officials (ASDSO) and EPRI, and with funding from the Federal Emergency Management Agency (FEMA), focused on a critical aspect of the safety issues related to analysis, inspection, maintenance, and performance of spillway gates. The intent of...

2000-06-16T23:59:59.000Z

259

Water Velocity Measurement on an Extended-Length Submerged Bar Screen at John Day Dam  

DOE Green Energy (OSTI)

This report describes a study of water velocity around an extended-length submerged bar screen (ESBS) at John Day Dam. The study was conducted for the U.S. Army Corps of Engineers by AScI Corporation and MEVATEC Corporation in March of 2000. This report was prepared by Pacific Northwest National Laboratory. ESBS are being studied as one method for diverting juvenile migrating fish from the dam's turbine intakes into the gate well and through the juvenile fish bypass channels.

Weiland, Mark A

2001-04-02T23:59:59.000Z

260

Non-powered Dams: An untapped source of renewable electricity in the USA  

Science Conference Proceedings (OSTI)

Hydropower has been a source of clean, renewable electricity in the USA for more than 100 years. Today, approximately 2500 US dams provide 78 GW of conventional and 22 GW of pumped-storage hydropower. In contrast, another approximately 80 000 dams in the USA do not include hydraulic turbine equipment and provide non-energy related services, such as flood control, water supply, navigation, and recreation.

Hadjerioua, Boualem [ORNL; Kao, Shih-Chieh [ORNL; Wei, Yaxing [ORNL; Battey, Hoyt [Department of Energy; Smith, Brennan T [ORNL

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIS-0480: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam  

Energy.gov (U.S. Department of Energy (DOE))

Two agencies of the Department of the Interior, Bureau of Reclamation and National Park Service, are jointly preparing a Long-Term Experimental and Management Plan for the Glen Canyon Dam and an EIS for adoption of the Plan. The Glen Canyon Dam, on the Colorado River in northern, Arizona, generates hydroelectric power that is marketed by DOE's Western Area Power Administration, a cooperating agency.

262

Optimization of Hydroacoustic Equipment Deployments at Lookout Point and Cougar Dams, Willamette Valley Project, 2010  

DOE Green Energy (OSTI)

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Lookout Point Dam (LOP) and the acoustic imaging system at Cougar Dam (CGR) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. The general approach was a multi-step process from mount design to final system configuration. The optimization effort resulted in successful deployments of hydroacoustic equipment at LOP and CGR.

Johnson, Gary E.; Khan, Fenton; Ploskey, Gene R.; Hughes, James S.; Fischer, Eric S.

2010-08-18T23:59:59.000Z

263

Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010  

Science Conference Proceedings (OSTI)

The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).

Carlson, Thomas J.; Skalski, John R.

2010-10-01T23:59:59.000Z

264

Lake Roosevelt Fisheries Evaluation Program; Limnological and Fisheries Monitoring, Annual Report 2000.  

DOE Green Energy (OSTI)

A slightly dryer than normal year yielded flows in Lake Roosevelt that were essentially equal to the past ten year average. Annual mean inflow and outflow were 3,160.3 m3/s and 3,063.4 m3/s respectively. Mean reservoir elevation was 387.2 m above sea level at the Grand Coulee Dam forebay. The forebay elevation was below the mean elevation for a total of 168 days. During the first half of the 2000 forebay elevation changed at a rate of 0.121 m/d and during the last half changed at a rate of 0.208 m/d. The higher rate of elevation change earlier in the year is due to the drawdown to accommodate spring runoff. Mean annual water retention time was 40 days. Annual mean total dissolved gas was 108%. Total dissolved gas was greatest at upriver locations (110% = US/Canada Border annual mean) and decreased moving toward Grand Coulee Dam (106% = Grand Coulee Dam Forebay annual mean). Total dissolved gas was greatest in May (122% reservoir wide monthly mean). Gas bubble trauma was observed in 16 fish primarily largescale suckers and was low in severity. Reservoir wide mean temperatures were greatest in August (19.5 C) and lowest in January (5.5 C). The Spokane River and Sanpoil River Arms experienced higher temperatures than the mainstem reservoir. Brief stratification was observed at the Sanpoil River shore location in July. Warm water temperatures in the Spokane Arm contributed to low dissolved oxygen concentrations in August (2.6 mg/L at 33 m). However, decomposition of summer algal biomass was likely the main cause of depressed dissolved oxygen concentrations. Otherwise, dissolved oxygen profiles were relatively uniform throughout the water column across other sampling locations. Annual mean Secchi depth throughout the reservoir was 5.7 m. Nutrient concentrations were generally low, however, annual mean total phosphorus (0.016 mg/L) was in the mesotrophic range. Annual mean total nitrogen was in the meso-oligotrophic range. Total nitrogen to total phosphorus ratios were large (31:1 annual mean) likely indicating phosphorus limitations to phytoplankton.

Lee, Chuck; Scofield, Ben; Pavlik, Deanne

2003-03-01T23:59:59.000Z

265

Winners Announced for the NNSA Grand Challenge Competition | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Winners Announced for the NNSA Grand Challenge Competition Winners Announced for the NNSA Grand Challenge Competition Winners Announced for the NNSA Grand Challenge Competition December 11, 2013 - 1:23pm Addthis President Carlton Brown of Clark Atlanta University pictured here with winning students junior Jules Henry (Electrical Engineering/Computer Science) and sophomore KeAndra Goodman (Electrical Engineering/Physics). President Carlton Brown of Clark Atlanta University pictured here with winning students junior Jules Henry (Electrical Engineering/Computer Science) and sophomore KeAndra Goodman (Electrical Engineering/Physics). Annie Whatley Annie Whatley Deputy Director, Office of Minority Economic Impact The first year of the Minority Serving Institution Partnership Program with the Department of Energy site Kansas City Plant was a fruitful one. The two

266

Grand Ridge Elementary Wind Project | Open Energy Information  

Open Energy Info (EERE)

Grand Ridge Elementary Wind Project Grand Ridge Elementary Wind Project Facility Grand Ridge Elementary Sector Wind energy Facility Type Community Wind Location WA Coordinates 47.545883°, -122.005714° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.545883,"lon":-122.005714,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

267

Fernald Preserve Visitors Center Grand Opening and LEED Platinum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Preserve Visitors Center Grand Opening and LEED Platinum Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to do three things here at Fernald: to close it, to clean it up and to give it back to the community. I'm proud to say we have fulfilled that commitment safely and ahead of schedule. Less than two years ago, I was here with Secretary Bodman as he announced the completion of a $4.4 billion clean up operation. Since then, we have

268

Grand Marais PUC - Residential Energy Efficiency Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Marais PUC - Residential Energy Efficiency Rebate Program Grand Marais PUC - Residential Energy Efficiency Rebate Program Grand Marais PUC - Residential Energy Efficiency Rebate Program < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount CFLs: $2/bulb or up to 50% of cost LEDs: $10 - $15/bulb Lighting Fixtures: $15 - $20/fixture Refrigerators: $25, plus $50 for recycling an old, working unit Freezers: $25, plus $50 for recycling an old, working unit Dishwashers: $25 Clothes Washers: $50 Dehumidifiers: $65 Room A/C: $25, plus $25 for recycling an old, working unit Central A/C: $100 - $200, plus additional rebate for efficiency ratings

269

GreenHunter Biodiesel Refinery Grand Opening | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer Today, Acting Deputy Secretary Jeffrey Kupfer delivered remarks at the launch of GreenHunter Energy's biodiesel refinery, which will be the nation's single largest biodiesel refinery, producing 105 million gallons of "white-water" B100 biodiesel per year. Thank you Gary. I'm pleased to join with Governor Perry, Congressmen Green and Lampson, and Mayor Garcia in celebrating this important occasion. Today, as we open the nation's largest biodiesel refinery, we reach another milestone in our effort to make America more energy secure. As you know, global energy demand is surging. We must act swiftly and aggressively to

270

Fernald Preserve Visitors Center Grand Opening and LEED Platinum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Preserve Visitors Center Grand Opening and LEED Platinum Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to do three things here at Fernald: to close it, to clean it up and to give it back to the community. I'm proud to say we have fulfilled that commitment safely and ahead of schedule. Less than two years ago, I was here with Secretary Bodman as he announced the completion of a $4.4 billion clean up operation. Since then, we have

271

Moreau-Grand Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Moreau-Grand Electric Coop Inc Moreau-Grand Electric Coop Inc Jump to: navigation, search Name Moreau-Grand Electric Coop Inc Place South Dakota Utility Id 12915 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO Other Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Industrial Small General Service Single Phase Commercial Small General Service Single Phase Well Commercial Small General Service Three Phase Commercial Average Rates Residential: $0.1090/kWh Commercial: $0.0798/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

272

City of Grand Junction, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Junction City of Grand Junction City of Place Iowa Utility Id 7486 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Commercial Demand Service Commercial Residential Eletric Residential Average Rates Residential: $0.1340/kWh Commercial: $0.1300/kWh Industrial: $0.0899/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Grand_Junction,_Iowa_(Utility_Company)&oldid=409673

273

Mutagenic potential of sediments from the Grand Calumet River  

Science Conference Proceedings (OSTI)

The Grand Calumet River/Indiana Harbor Canal is one of the International Joint Commission's Great Lakes Areas of Concern (AOC). Like many other AOCs, the Grand Calumet River is in a heavily industrialized area and has a history of chemical contamination. Many of the chemicals found in the industrial and municipal wastes that enter the waterway end up in sediment where they are concentrated to high levels. In order to assess the potential genotoxicity of sediments from the Grand Calumet River, the authors determined the mutagenic potential of organic extracts of sediments. The sediment extracts were assayed in the Salmonella/microsome mutagenicity test. In the Ames test, all ten sediment samples assayed were found to be mutagenic. In general, chemicals found in the sediments required metabolic activation before a positive mutagenic response was observed.

Maccubbin, A.E.; Ersing, N. (Roswell Park Cancer Inst., Buffalo, NY (United States))

1991-08-01T23:59:59.000Z

274

Investigations into the Early Life-history of Naturally Produced Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Basin, Annual Report 2001.  

SciTech Connect

We determined migration timing and abundance of juvenile spring chinook salmon Oncorhynchus tshawytscha and juvenile steelhead/rainbow trout Oncorhynchus mykiss using rotary screw traps on four streams in the Grande Ronde River basin during the 2001 migratory year (MY 2001) from 1 July 2000 through 30 June 2001. Based on migration timing and abundance, two distinct life-history strategies of juvenile spring chinook and O. mykiss could be distinguished. An 'early' migrant group left upper rearing areas from 1 July 2000 through 29 January 2001 with a peak in the fall. A 'late' migrant group descended from upper rearing areas from 30 January 2001 through 30 June 2001 with a peak in the spring. The migrant population of juvenile spring chinook salmon in the upper Grande Ronde River in MY 2001 was very low in comparison to previous migratory years. We estimated 51 juvenile spring chinook migrated out of upper rearing areas with approximately 12% of the migrant population leaving as early migrants to overwinter downstream. In the same migratory year, we estimated 16,067 O. mykiss migrants left upper rearing areas with approximately 4% of these fish descending the upper Grande Ronde River as early migrants. At the Catherine Creek trap, we estimated 21,937 juvenile spring chinook migrants in MY 2001. Of these migrants, 87% left upper rearing areas early to overwinter downstream. We also estimated 20,586 O. mykiss migrants in Catherine Creek with 44% leaving upper rearing areas early to overwinter downstream. At the Lostine River trap, we estimated 13,610 juvenile spring chinook migrated out of upper rearing areas with approximately 77% migrating early. We estimated 16,690 O. mykiss migrated out of the Lostine River with approximately 46% descending the river as early migrants. At the Minam River trap, we estimated 28,209 juvenile spring chinook migrated out of the river with 36% migrating early. During the same period, we estimated 28,113 O. mykiss with approximately 14% of these fish leaving as early migrants. Juvenile spring chinook salmon PIT-tagged at trap sites in the fall and in upper rearing areas during winter were used to compare migration timing and survival to Lower Granite Dam of the early and late migrant groups. Juvenile spring chinook tagged on the upper Grande Ronde River were detected at Lower Granite Dam from 4 May to 20 May 2001, with a median passage date of 17 May. Too few fish were collected and tagged to conduct detection rate and survival comparisons between migrant groups. PIT-tagged salmon from Catherine Creek trap were detected at Lower Granite Dam from 27 April to 13 July 2001. Early migrants were detected significantly earlier (median = 10 May) than late migrants (median = 1 June). Also, early migrants from Catherine Creek were detected at a significantly higher rate than fish tagged in upper rearing areas in the winter, suggesting better survival for fish that migrated out of upper rearing areas in the fall. Juvenile spring chinook salmon from the Lostine River were detected at Lower Granite Dam from 2 April through 4 July 2001. Early migrants were detected significantly earlier (median = 27 April) than late migrants (median = 14 May). However, there was no difference in detection rates between early and late migrants. Survival probabilities showed similar patterns as dam detection rates. Juvenile spring chinook salmon from the Minam River were detected at Lower Granite Dam from 8 April through 18 August 2001. Early migrants were detected significantly earlier (median = 28 April) than late migrants (median = 14 May). Late migrants from the Minam River were tagged at the trap in the spring. Spring chinook salmon parr PIT-tagged in summer 2000 on Catherine Creek and the Imnaha, Lostine, and Minam rivers were detected at Lower Granite Dam over an 87 d period from 8 April to 3 July 2001. The migratory period of individual populations ranged from 51 d (Imnaha River) to 67 d (Catherine Creek) in length. Median dates of migration ranged from 30 April (Imnaha River) to 17 May (Catherine Creek). Detection ra

Reischauer, Alyssa; Monzyk, Frederick; Van Dyke, Erick

2003-06-01T23:59:59.000Z

275

Optimization of Hydroacoustic Deployments at John Day Dam  

DOE Green Energy (OSTI)

This report describes short-term studies conducted in late November and early December 2001 to optimize hydroacoustic sampling techniques for John Day Dam before the 2002 fish passage efficiency (FPE) study. Knowledge gained in this study should significantly improve hydroacoustic sampling and the accuracy of estimates of fish passage at two locations that have presented problems in past studies. The spillway has been most problematic because many fish detected there were not entrained. Without correction, non-commitment of fish can result in multiple detections and overestimation of fish passage and FPE. Trash-rack-mounted, down-looking transducers for sampling unguided fish at a submerged traveling screen (STS) also have posed problems because the beam was aimed so far downstream that researchers had concerns about fish aspect and detectability. The deployments, aiming angles, and ping rates described here should eliminate all problems encountered in previous studies. This report describes hydroacoustic evaluations. The spill-bay deployment identified in this study should completely eliminate multiple detections of fish by limiting the sample volume for counting fish to the deep high-discharge volume adjacent to the gate. Results from testing of transducers deployed in a turbine intake with an STS suggest that, after testing in 2002, it may be possible to cut the number of powerhouse transducers sampling STS units by 50% or to double the spatial sampling coverage with the same number of transducers, all while improving detectability.

Ploskey, Gene R.; Cook, Christopher B.; Titzler, P. Scott; Moursund, Russell A.

2002-11-12T23:59:59.000Z

276

Operation of the Lower Granite Dam Adult Trap, 2008.  

DOE Green Energy (OSTI)

During 2008 we operated the adult salmonid trap at Lower Granite Dam from 7 March through 25 November, except during a short summer period when water temperatures were too high to safely handle fish. We collected and handled a total of 20,463 steelhead Oncorhynchus mykiss and radio-tagged 34 of the hatchery steelhead. We took scale samples from 3,724 spring/summer Chinook salmon O. tshawytscha for age and genetic analysis. We collected and handled a total of 8,254 fall Chinook salmon. Of those fish, 2,520 adults and 942 jacks were transported to Lyons Ferry Hatchery on the Snake River in Washington. In addition, 961 adults and 107 jacks were transported to the Nez Perce Tribal Hatchery on the Clearwater River in Idaho. The remaining 3,724 fall Chinook salmon were passed upstream. Scales samples were taken from 780 fall Chinook salmon tagged with passive integrated transponder (PIT) tags and collected by the sort-by-code system.

Harmon, Jerrel R.

2009-01-01T23:59:59.000Z

277

Priest Rapids Dam flow curtailment: Incident report, January 7, 1961  

SciTech Connect

This incident report deals with mechanical damage (caused by falling rocks) to the power line supplying station power, Priest Rapids Dam lost all generating flow at 4:23 p.m., cutting discharge from 71,700 cfs to about 12,000 cfs. Within five minutes, spillway gates were opened, bringing river flow back to greater than 36,000 cfs in about 10 minutes. The flow at 181-B dropped from 72,000 cfs to a minimum of 56,000 cfs at about 5:25 p.m. Priest Rapids generators returned to service at 4:45 p.m., the indicated flow at the gauge reaching 71,700 cfs again at about 8:00 p.m. River temperatures at the gauge increased 0.5 C following the interruption, but not at 181-B. Prompt HAPO notification of the flow reduction as provided for in the agreement between the PUD and the AEC was not made on this occasion; the first notice came from the 251 Substation.

Kramer, H.A.; Corley, J.P.

1961-01-20T23:59:59.000Z

278

Grand Symmetry, Spectral Action, and the Higgs mass  

E-Print Network (OSTI)

In the context of the spectral action and the noncommutative geometry approach to the standard model, we build a model based on a larger symmetry. The latter satisfies all the requirements to have a noncommutative manifold, and mixes gauge and spin degrees of freedom without introducing extra fermions. With this "grand symmetry" it is natural to have the scalar field necessary to obtain the Higgs mass in the vicinity of 126 GeV. Requiring the noncommutative space to be an almost commutative geometry (i.e. the product of manifold by a finite dimensional internal space) gives conditions for the breaking of this grand symmetry to the standard model.

Agostino Devastato; Fedele Lizzi; Pierre Martinetti

2013-04-01T23:59:59.000Z

279

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2004 Annual Report.  

DOE Green Energy (OSTI)

Redd counts were used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U.S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2004; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2004 was funded by the Bonneville Power Administration, Idaho Power Company, and Bureau of Land Management.

Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

2005-10-01T23:59:59.000Z

280

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2005 Annual Report.  

DOE Green Energy (OSTI)

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2005; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U.S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2005 was funded by the Bonneville Power Administration and Idaho Power Company.

Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

2006-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

(DOE/EIS-0183-SA-05): Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, 10/17/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 17, 2002 October 17, 2002 REPLY TO ATTN OF: KECP-4 SUBJECT: Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, DOE/EIS-0183-SA-05 memorandum Mark A. Jones Program Analyst - PGF-6 TO : Proposed Action: Boise River Diversion Dam - Amendment to Capital Investment Sub-Agreement, Contract Number DE-MS79-94BP94618 Proposed By: Bonneville Power Administration (BPA) and Bureau of Reclamation (Reclamation) Location: Near Boise, in Ada County, Idaho Description of the Proposed Action: BPA proposes to fund Reclamation's rehabilitation of the powerplant at the existing Boise River Diversion Dam (Diversion Dam) to use the water resource at Diversion Dam for electrical power production. Analysis: The Diversion Dam is located about 7 miles southeast of Boise, Idaho on the Boise River, about

282

Synthesis of Juvenile Salmonid Passage Studies at The Dalles Dam, Volume II, 2001-05  

DOE Green Energy (OSTI)

The overall goal of juvenile salmonid research at The Dalles Dam is to provide data to inform decisions on strategies to improve smolt survival rates at the project. Survival improvement strategies address the three primary passage routes at The Dalles Dam -- spillway, sluiceway, and turbines with the general intent to increase spill and sluice passage and decrease turbine passage. Since the review by Ploskey et al. (2001a) of research during 1982-2000 at The Dalles Dam, the Corps funded over $20M of research in at least 39 studies during 2001-2006. The purpose of the current review is to synthesize juvenile salmonid passage data at The Dalles Dam (TDA) collected from 2001 through 2006. The data we synthesize comes from numerous research techniques employed to address particular study objectives at The Dalles Dam. The suite of techniques includes acoustic and radio telemetry, acoustic cameras, acoustic Doppler current profilers, balloon tags, computational fluid dynamics models, drogues, fixed and mobile hydroacoustics, fyke nets, physical scale models, PIT-tags, sensor fish, sonar trackers, and underwater video. Hydraulic data involves flow patterns and water velocities. Biological data involve forebay approach paths and residence times, horizontal and diel distributions, passage efficiencies and effectiveness, fish behaviors, tailrace egress and predation rates, and route-specific and total project survival rates. Data for 2001-2006 are synthesized in this report to provide, in conjunction with Ploskey et al. (2001a), resources for engineers, biologists, and dam operators to use when making decisions about fish protection measures for juvenile salmonids at The Dalles Dam. This review covers the major fish passage research efforts during 2001-2006 and includes sections on the Environmental Setting, Forebay and Project Passage Studies, Spill Studies, Sluiceway Studies, Turbine Studies, Smolt Survival Studies, and a Discussion.

Johnson, Gary E.; Beeman, John W.; Duran, Ian; Puls, Andrew

2007-08-15T23:59:59.000Z

283

Assessment of the impacts of demand curtailments in the DAMs: issues in and proposed modifications of FERC Order No. 745.  

E-Print Network (OSTI)

??The Federal Energy Regulatory Commission (FERC), in its initiative to incentivize demand response resources (DRRs) to participate in the day-ahead markets (DAMs), enacted Order No. (more)

Castillo, Isaac

2013-01-01T23:59:59.000Z

284

Survival Estimates for the Passage of Yearling Chinook Salmon and Steelhead through Snake River Dams and Reservoirs, 1995 Annual Report.  

DOE Green Energy (OSTI)

Documentation is provided for the third of a multiyear study to estimate the survival of juvenile salmonids passing through dams and reservoirs on the Snake River.

Muir, William D.

1996-03-01T23:59:59.000Z

285

Water-induced displacement in Thua Thien Hue province: the impacts of hydropower dams on livelihood of forest dependent people.  

E-Print Network (OSTI)

??Thua Thien Hue province is one of provinces in Vietnam where a high potential for hydroelectricity has resulted in the construction of dams for energy (more)

Yustina Artati, ..

2011-01-01T23:59:59.000Z

286

The verifying compiler: A grand challenge for computing research  

Science Conference Proceedings (OSTI)

This contribution proposes a set of criteria that distinguish a grand challenge in science or engineering from the many other kinds of short-term or long-term research problems that engage the interest of scientists and engineers. As an example drawn ...

Tony Hoare

2003-01-01T23:59:59.000Z

287

The verifying compiler: a grand challenge for computing research  

Science Conference Proceedings (OSTI)

I propose a set of criteria which distinguish a grand challenge in science or engineering from the many other kinds of short-term or long-term research problems that engage the interest of scientists and engineers. As an example drawn from Computer Science, ...

Tony Hoare

2003-04-01T23:59:59.000Z

288

Workshop and conference on Grand Challenges applications and software technology  

SciTech Connect

On May 4--7, 1993, nine federal agencies sponsored a four-day meeting on Grand Challenge applications and software technology. The objective was to bring High-Performance Computing and Communications (HPCC) Grand Challenge applications research groups supported under the federal HPCC program together with HPCC software technologists to: discuss multidisciplinary computational science research issues and approaches, identify major technology challenges facing users and providers, and refine software technology requirements for Grand Challenge applications research. The first day and a half focused on applications. Presentations were given by speakers from universities, national laboratories, and government agencies actively involved in Grand Challenge research. Five areas of research were covered: environmental and earth sciences; computational physics; computational biology, chemistry, and materials sciences; computational fluid and plasma dynamics; and applications of artificial intelligence. The next day and a half was spent in working groups in which the applications researchers were joined by software technologists. Nine breakout sessions took place: I/0, Data, and File Systems; Parallel Programming Paradigms; Performance Characterization and Evaluation of Massively Parallel Processing Applications; Program Development Tools; Building Multidisciplinary Applications; Algorithm and Libraries I; Algorithms and Libraries II; Graphics and Visualization; and National HPCC Infrastructure.

1993-12-31T23:59:59.000Z

289

The Dalles Dam, Columbia River: Spillway Improvement CFD Study  

DOE Green Energy (OSTI)

This report documents development of computational fluid dynamics (CFD) models that were applied to The Dalles spillway for the US Army Corps of Engineers, Portland District. The models have been successfully validated against physical models and prototype data, and are suitable to support biological research and operations management. The CFD models have been proven to provide reliable information in the turbulent high-velocity flow field downstream of the spillway face that is typically difficult to monitor in the prototype. In addition, CFD data provides hydraulic information throughout the solution domain that can be easily extracted from archived simulations for later use if necessary. This project is part of an ongoing program at the Portland District to improve spillway survival conditions for juvenile salmon at The Dalles. Biological data collected at The Dalles spillway have shown that for the original spillway configuration juvenile salmon passage survival is lower than desired. Therefore, the Portland District is seeking to identify operational and/or structural changes that might be implemented to improve fish passage survival. Pacific Northwest National Laboratory (PNNL) went through a sequence of steps to develop a CFD model of The Dalles spillway and tailrace. The first step was to identify a preferred CFD modeling package. In the case of The Dalles spillway, Flow-3D was as selected because of its ability to simulate the turbulent free-surface flows that occur downstream of each spilling bay. The second step in development of The Dalles CFD model was to assemble bathymetric datasets and structural drawings sufficient to describe the dam (powerhouse, non-overflow dam, spillway, fish ladder entrances, etc.) and tailrace. These datasets are documented in this report as are various 3-D graphical representations of The Dalles spillway and tailrace. The performance of the CFD model was then validated for several cases as the third step. The validated model was then applied to address specific SIS design questions. Specifically, the CFD models were used to evaluate flow deflectors, baffle block removal and the effects of spillwalls. The CFD models were also used to evaluate downstream differences at other locations, such as at the Highway 197 bridge piers and Oregon shore islands, due to alterations in spill pattern. CFD model results were analyzed to quantitatively compare impacts of the spillwall that has subsequently been constructed between bays 6 and 7. CFD model results provided detailed information about how the spillwall would impact downstream flow patterns that complemented results from the 1:80 scale physical model. The CFD model was also used to examine relative differences between the juvenile spill pattern used in previous years and the anticipated spill pattern that will be applied once the wall is complete. In addition, the CFD model examined velocity magnitudes over the downstream basalt shelf to investigate potential for erosion under high flow conditions (e.g., 21 kcfs/bay for bays 1 through 6) with the spillwall in place. Several appendices follow the results and discussion sections of this report. These appendices document the large number of CFD simulations that have been performed by PNNL; both spillway improvement study (SIS) related and those performed for related biological tests.

Cook, Chris B.; Richmond, Marshall C.; Serkowski, John A.

2006-06-01T23:59:59.000Z

290

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

2005-01-01T23:59:59.000Z

291

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

In 2002 a total of 364 adult fall chinook and 472 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 290 fall chinook and 403 chum samples. The peak redd count for fall chinook was 214. The peak redd count for chum was 776. Peak spawning time for fall chinook was set at approximately 15 November. Peak spawning time for chum occurred approximately 6 December. There were estimated to be a total of 1,881 fall chinook spawning below Bonneville Dam in 2002. The study area's 2002 chum population was estimated to be 4,232 spawning fish. Temperature unit data suggests that below Bonneville Dam 2002 brood bright stock, fall chinook emergence began on February 3 2003 and ended 7 May 2003, with peak emergence occurring 20 April. 2002 brood juvenile chum emergence below Bonneville Dam began 27 January and continued through 6 April 2003. Peak chum emergence took place 1 March. A total of 10,925 juvenile chinook and 1,577 juvenile chum were sampled between the dates of 24 January and 21 July 2003 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2003 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2002 and 2003 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Clark, Roy; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

2004-01-01T23:59:59.000Z

292

Feasibility report on the potential hydroelectric development at Combie Dam. [3. 5 MW, 70-ft head  

DOE Green Energy (OSTI)

The results of an investigation of the technical, environmental, economic and financial feasibility of installing a hydroelectric powerplant at the existing Combie Dam on the Bear River in Nevada and Placer Counties, California, are discussed. This dam is owned and operated by the Nevada Irrigation District (the District) to act as a diversion and provide some storage for District water supply. The power plant would utilize flows which presently pass over the dam's spillway. The project would involve expanding the existing four foot diameter outlet on the southern gravity portion of the dam, installing a penstock (approximately 175 feet long, 102 inches in diameter) and constructing a 3500 kilowatts (kW) power plant on the south bank of the river below the dam. The capital cost of the project, including interest during construction, would total approximately $4,500,000 in July 1980 dollars. The unit capacity cost of the project at the 1980 price level would be $1,285 per kilowatt. The energy production unit cost would be 41.4 mills per kilowatt hour in 1980, and 56.3 mills per kilowatt hour in 1984. Environmental impacts of the Combie Power Project would be minimal. The primary conclusion from this study is that the Combie Power Project is economically, environmentally and institutionally viable, at the present time if an adequate power purchase agreement can be reached. Continued escalation of energy values will make this project even more attractive. (WHK)

Not Available

1980-10-01T23:59:59.000Z

293

The Influence of Large Dams on Surrounding Climate and Precipitation Patterns  

DOE Green Energy (OSTI)

Understanding the forcings exerted by large dams on local climate is key to establishing if artificial reservoirs inadvertently modify precipitation patterns in impounded river basins. Using a 30 year record of reanalysis data, the spatial gradients of atmospheric variables related to precipitation formation are identified around the reservoir shoreline for 92 large dams of North America. Our study reports that large dams influence local climate most in Mediterranean, arid and semi-arid climates, while for humid climates the influence is least. During the growing season, large dams in Mediterranean climates increase CAPE 2-3 times near the reservoir compared to the non-growing season. Clear spatial gradients of CAPE, specific humidity and surface evaporation are also observed around the fringes between the reservoir shoreline and further from these dams. Because of the increasing correlation observed between higher percentile of rain and CAPE, our findings point to the possibility of storm intensification in impounded basins of the Mediterranean and arid climates of the United States.

Degu, Ahmed M.; Hossain, Faisal; Niyogi, Dev; Pielke, Roger; Shepherd, J. M.; Voisin, Nathalie; Chronis, Themis

2011-03-21T23:59:59.000Z

294

Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

2011-03-01T23:59:59.000Z

295

EA-1338: Transfer of the Department of Energy Grand Junction Office to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Transfer of the Department of Energy Grand Junction Office 8: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 25, 2000 EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 25, 2000 EA-1338: Final Environmental Assessment Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership

296

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor  

E-Print Network (OSTI)

Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line for commuter rail service. In addition the Grand Junction ...

Bockelie, Adam

2012-01-01T23:59:59.000Z

297

PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 and EA-33-A Rio Grande Electric Cooperative Inc PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc Rescission of Presidential Permit and Electricity Export Authorization...

298

CX-005379: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5379: Categorical Exclusion Determination 5379: Categorical Exclusion Determination CX-005379: Categorical Exclusion Determination Insulator Replacement in Agricultural Lands Along the Grand Coulee-Bell Number 3/Grand Coulee-Westside No. 1 Double Circuit 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/02/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace worn insulators on sections of the Grand Coulee-Bell Number 3/Grand Coulee-Westside Number 1 double circuit 230-kilovolt (kV) transmission line. This portion of the transmission line is located in Lincoln County, Washington, in BPA?s Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed below.

299

CX-008704: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

300

CX-010424: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar  

DOE Green Energy (OSTI)

Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

Suzanne McSawby, Project Director

2008-12-31T23:59:59.000Z

302

Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.  

DOE Green Energy (OSTI)

In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

1993-03-10T23:59:59.000Z

303

A Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In  

Open Energy Info (EERE)

Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In A Philippine Aborigine Legend Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In A Philippine Aborigine Legend Details Activities (0) Areas (0) Regions (0) Abstract: The prehistoric eruptions of Mount Pinatubo have followed a cycle: centuries of repose terminated by a caldera-forming eruption with large pyroclastic flows; a post-eruption aftermath of rain-triggered lahars in surrounding drainages and dome-building that fills the caldera; and then another long quiescent period. During and after the eruptions lahars descending along volcano channels may block tributaries from watersheds

304

Effects of Flaming Gorge Dam hydropower operations on downstream flow, stage, and sediment transport  

DOE Green Energy (OSTI)

Hydropower operations at Flaming Gorge Dam, located on the Green River in Utah, can produce rapid downstream changes in flow and stage. These changes can in turn affect sediment transport and ecologic resources below the dam. To evaluate these effects, four hydropower operational scenarios with varying degrees of hydropower-release fluctuations were examined. This study demonstrates that the combined use of river-flow routing, water-surface profile, and sediment-transport models can provide useful information for evaluating the potential impacts of hydropower-operations on ecological and other resources downstream of the dam. Study results show that flow fluctuations may or may not persist for a long distance, depending on the initial magnitude of fluctuation and the duration of hydropower peaking. Stage fluctuations depend not only on flow fluctuations but also on river channel characteristics, such as channel width and longitudinal slope.

Yin, S.C.L.; Tomasko, D.; Cho, H.E.; Williams, G. [Argonne National Lab., IL (United States); McCoy, J.; Palmer, C. [USDOE Western Area Power Administration, Salt Lake City, UT (United States)

1996-11-01T23:59:59.000Z

305

Fish Migration, Dams, and Loss of Ecosystem Services in the Mekong Basin  

DOE Green Energy (OSTI)

The past decade has seen increased international recognition of the importance of the services provided by natural ecosystems. It is unclear however whether such international awareness will lead to improved environmental management in many regions. We explore this issue by examining the specific case of fish migration and dams on the Mekong river. We determine that dams on the Mekong mainstem and major tributaries will have a major impact on the basin's fisheries and the people who depend upon them for food and income. We find no evidence that current moves towards dam construction will stop, and consider two scenarios for the future of the fisheries and other ecosystems of the basin. We conclude that major investment is required in innovative technology to reduce the loss of ecosystem services, and alternative livelihood strategies to cope with the losses that do occur

Dugan, Patrick J. [WorldFish Center; Barlow, Chris [Australian Center for International Agricultural Research (ACIAR); Agostinho, Angelo A. [Fundacao University, Parana Brazil; Baran, Eric [WorldFish Center; Cada, Glenn F [ORNL; Chen, Daqing [Yangtze River Fisheries Research Institute, People's Republic of China; Cowx, Ian G. [Hull International Fisheries Research Institute, England; Ferguson, John W. [North West Fisheries Science Center, Seattle, WA; Jutagate, Tuantong [Ubon Ratchathani University, Ubon Ratchathani, Thailand; Mallen-Cooper, Martin [Fishway Consulting Service, Australia; Marmulla, Gerd [Food and Agriculture Organization of the United Nations (FAO), Rome, Italy; Nestler, John [USA Corps Engineers, Concord, MA USA; Petrere, Miquel [Universidade Estadual Paulista, Rio Claro, Brazil; Winemiller, Kirk O. [Texas A& M University

2010-06-01T23:59:59.000Z

306

The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline  

E-Print Network (OSTI)

The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline D.W. (Don) Wilson, Director, North Atlantic Pipeline Partners, L.P. NOIA 2000 Conference June, 2000 #12;Grand Banks Multi-Purpose Pipeline Route January 2000 Grand Banks of Newfoundland Newfoundland Come by Chance St. John's Argentia 50o

Bruneau, Steve

307

A New Species of Parodia (Cactaceae, Notocacteae) from Rio Grande do Sul, Brazil  

E-Print Network (OSTI)

A New Species of Parodia (Cactaceae, Notocacteae) from Rio Grande do Sul, Brazil Marlon C. Machado Grande do Sul, Brazil. jlarocca@unisinos.br ABSTRACT . A new species, Parodia gaucha M. Machado & Larocca (Cactaceae, Notocacteae), from Encruzilhada do Sul, Rio Grande do Sul, Brazil, is described and illustrated

Zürich, Universität

308

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.  

DOE Green Energy (OSTI)

The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

Bellgraph, Brian J. [Pacific Northwest National Laboratory

2009-03-31T23:59:59.000Z

309

Libby Dam Hydro-electric Project Mitigation: Efforts for Downstream Ecosystem Restoration.  

DOE Green Energy (OSTI)

Construction of Libby Dam, a large hydropower and flood control dam occurred from 1966 to 1975 on the Kootenai River, near Libby, Montana in the Northwestern United States. Live reservoir storage is substantial, with water residence time of about 5 1/2 months (based on mean annual discharge of about 440 m{sup 3}/s). Downstream river discharge and thermal regimes and the dependent habitat conditions have been significantly altered by dam construction and operation relative to pre-dam conditions. Highly valued Kootenai River fish populations, including white sturgeon Acipenser transmontanus, burbot Lota lota and bull trout Salvelinus confluentus and their supporting ecological conditions have been deteriorating during post-dam years. Measurements of the presence of very low (ultraoligotrophic) concentrations of dissolved phosphorus in the river downstream from Libby Dam were identified as a critical limitation on primary production and overall ecosystem health. A decision was made to initiate the largest experimental river fertilization project to date in the Kootenai River at the Montana-Idaho border. Pre-treatment aquatic biomonitoring began in 2001; post-treatment monitoring began in 2005. A solar-powered nutrient addition system was custom designed and built to dose small releases of dissolved nutrients at rates from 10 to 40 L/hour, depending on river discharge, which averaged several hundred m3/s. Closely monitored experimental additions of ammonium polyphosphate solution (10-34-0) into the river occurred during the summers of 2005 through 2008. Targets for mixed in-river P concentrations were 1.5 {micro}g/L in 2005, and 3 {micro}g/L in subsequent years. Primary productivity and algal accrual rates along with invertebrate and fish community metrics and conditions were consistently measured annually, before and after experimental fertilization. Initial results from the program are very encouraging, and are reported.

Holderman, Charles

2009-02-10T23:59:59.000Z

310

Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008  

DOE Green Energy (OSTI)

Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

2010-02-12T23:59:59.000Z

311

Dormaier and Chester Butte 2007 Follow-up Habitat Evaluation Procedures Report.  

DOE Green Energy (OSTI)

Follow-up habitat evaluation procedures (HEP) analyses were conducted on the Dormaier and Chester Butte wildlife mitigation sites in April 2007 to determine the number of additional habitat units to credit Bonneville Power Administration (BPA) for providing funds to enhance, and maintain the project sites as partial mitigation for habitat losses associated with construction of Grand Coulee Dam. The Dormaier follow-up HEP survey generated 482.92 habitat units (HU) or 1.51 HUs per acre for an increase of 34.92 HUs over baseline credits. Likewise, 2,949.06 HUs (1.45 HUs/acre) were generated from the Chester Butte follow-up HEP analysis for an increase of 1,511.29 habitat units above baseline survey results. Combined, BPA will be credited with an additional 1,546.21 follow-up habitat units from the Dormaier and Chester Butte parcels.

Ashley, Paul R.

2008-01-01T23:59:59.000Z

312

Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.  

DOE Green Energy (OSTI)

The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colville Tribes Mitigation Project during the 2006 contract period.

Whitney, Richard; Berger, Matthew; Tonasket, Patrick

2006-12-01T23:59:59.000Z

313

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

2012-06-01T23:59:59.000Z

314

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-03-01T23:59:59.000Z

315

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

2012-02-01T23:59:59.000Z

316

Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study estimated dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provided additional performance measures as stipulated in the Columbia Basin Fish Accords. This summary report focuses on spring run stocks, yearling Chinook salmon and steelhead.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Johnson, Gary E.; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-12T23:59:59.000Z

317

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-07T23:59:59.000Z

318

SUMMARY OF USSD EMERGING ISSUES WHITE PAPER ON DAM SAFETY RISK ASSESSMENT: WHAT IS IT? WHO'S USING IT  

E-Print Network (OSTI)

SUMMARY OF USSD EMERGING ISSUES WHITE PAPER ON DAM SAFETY RISK ASSESSMENT: WHAT IS IT? WHO'S USING White Paper on Dam Safety Risk Assessment. It also includes tables that summarize strengths and references that are summarized in the White Paper, technology transfer and training needs, and research

Bowles, David S.

319

Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dales Dam, Spring 2011  

SciTech Connect

The study estimated dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provided additional performance measures as stipulated in the Columbia Basin Fish Accords. This summary report focuses on spring run stocks, yearling Chinook salmon and steelhead.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Johnson, Gary E.; Ploskey, Gene R.; Carlson, Thomas J.

2012-02-01T23:59:59.000Z

320

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

Ward, David L.; Kern, J. Chris; Hughes, Michele L.

2003-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

2004-02-01T23:59:59.000Z

322

Comparison of coupled and decoupled modal approaches in seismic analysis of concrete gravity dams in time domain  

Science Conference Proceedings (OSTI)

Different methods are available for dynamic analysis of concrete dams. Among these, modal approach is highly popular due to the efficiency of the method. This becomes more significant if the response is to be calculated for several earthquake ground ... Keywords: Concrete gravity dam, Coupled modes, Decoupled modal approach, Dynamic analysis

Ali Samii; Vahid Lotfi

2007-09-01T23:59:59.000Z

323

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release

324

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011  

Science Conference Proceedings (OSTI)

This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

2013-06-21T23:59:59.000Z

325

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010  

SciTech Connect

This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

326

Survival and Passage of Yearling and Subyearling Chinook Salmon and Steelhead at The Dalles Dam, 2010  

DOE Green Energy (OSTI)

The acoustic telemetry study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival and other performance measures for yearling and subyearling Chinook salmon and steelhead at The Dalles Dam as stipulated by the 2008 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS) and 2008 Columbia Basin Fish Accords.

Johnson, Gary E.; Skalski, J. R.; Carlson, Thomas J.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Fischer, Eric S.; Hughes, James S.; Khan, Fenton; Kim, Jin A.; Townsend, Richard L.

2011-12-01T23:59:59.000Z

327

Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007  

DOE Green Energy (OSTI)

The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

2008-12-01T23:59:59.000Z

328

Grand Forks, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Grand Forks, North Dakota: Energy Resources Grand Forks, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.9252568°, -97.0328547° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.9252568,"lon":-97.0328547,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

329

GIS Data from LANL's Cerro Grande Rehabilitation Project (CGRP)  

DOE Data Explorer (OSTI)

The Los Alamos National Laboratorys Cerro Grande Rehabilitation Project (CGRP) involves many subprojects. One of them is a geographic information system for electronically storing and displaying geographically-related data about the fires effects. The data are used for research, planning, emergency response, and for informing the public. This website provides access to geospatial data relating to the May 2000 Cerro Grande Fire. This includes data generated by the Burned Area Emergency Rehabilitation (BAER) Team during and shortly after the fire as well as data resulting from the ongoing environmental monitoring programs related to the fire. These data are available from a data catalog in two forms: (i) direct download of individual geospatial files and (ii) image files.

330

Chattanooga Eagle Ford Rio Grande Embayment Texas- Louisiana-  

U.S. Energy Information Administration (EIA) Indexed Site

Rio Grande Rio Grande Embayment Texas- Louisiana- Mississippi Salt Basin Uinta Basin Appa lachia n Basin Utica Marcellus Devonian (Ohio) Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville Hermosa Mancos Pierre Conasauga Woodford- Caney Pearsall- Eagle Ford Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Maverick Sub-Basin Montana Thrust Belt Marfa Basin Valley and Ridge Province Arkoma Basin Forest City Basin Piceance Basin Shale Gas Plays, Lower 48 States 0 200 400 100 300 Miles ± Source: Energy Information Administration based on data from various published studies

331

East Grand St Bridge Snowmelt Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Bridge Snowmelt Low Temperature Geothermal Facility Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East Grand St Bridge Sector Geothermal energy Type Snowmelt Location Laramie, Wyoming Coordinates 41.3113669°, -105.5911007° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

332

Grand Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Grand Ridge II Wind Farm Facility Grand Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

333

City of Grand Island, Nebraska (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Island City of Grand Island City of Place Nebraska Utility Id 40606 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Flood Lighting Lighting Commercial Rate- Single Phase Commercial Commercial Rate- Three Phase Commercial Residential Rate Residential Three Phase Power Service Industrial

334

City of Grand Haven, Michigan (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Haven Grand Haven Place Michigan Utility Id 7483 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Space Lighting Service - 100 Watt Lighting Area Space Lighting Service - 1000 Watt Lighting Area Space Lighting Service - 175 Watt Mercury Vapor Lighting Area Space Lighting Service - 400 Watt Mercury Vapor Lighting Area Space Lighting Service - Metal Halide 175 Watt Lighting

335

Arroyo Grande, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Arroyo Grande, California: Energy Resources Arroyo Grande, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.1185868°, -120.5907252° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1185868,"lon":-120.5907252,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

336

Rio Grande Electric Coop, Inc (New Mexico) | Open Energy Information  

Open Energy Info (EERE)

New Mexico) New Mexico) Jump to: navigation, search Name Rio Grande Electric Coop, Inc Place New Mexico Utility Id 16057 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.1560/kWh Commercial: $0.1630/kWh Industrial: $0.1170/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File2_2010" Retrieved from "http://en.openei.org/w/index.php?title=Rio_Grande_Electric_Coop,_Inc_(New_Mexico)&oldid=412780" Categories: EIA Utility Companies and Aliases Utility Companies Organizations Stubs What links here

337

City of Grand Rapids Building Solar Roof Demonstration  

SciTech Connect

Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

DeClercq, Mark; Martinez, Imelda

2012-08-31T23:59:59.000Z

338

Volume terms for charged colloids: a grand-canonical treatment  

E-Print Network (OSTI)

We present a study of thermodynamic properties of suspensions of charged colloids on the basis of linear Poisson-Boltzmann theory. We calculate the effective Hamiltonian of the colloids by integrating out the ionic degrees of freedom grand-canonically. This procedure not only yields the well-known pairwise screened-Coulomb interaction between the colloids, but also additional volume terms which affect the phase behavior and the thermodynamic properties such as the osmotic pressure. These calculations are greatly facilitated by the grand-canonical character of our treatment of the ions, and allow for relatively fast computations compared to earlier studies in the canonical ensemble. Moreover, the present derivation of the volume terms are relatively simple, make a direct connection with Donnan equilibrium, yield an explicit expression for the effective screening constant, and allow for extensions to include, for instance, nonlinear effects.

Bas Zoetekouw; Rene van Roij

2005-10-10T23:59:59.000Z

339

Field Studies of Geothermal Reservoirs Rio Grande Rift, New Mexico  

DOE Green Energy (OSTI)

The Rio Grande rift provides an excellent field laboratory to study the nature of geothermal systems in an extensional environment. Much of the geologic complexity that is found in the Basin and Range is absent because the rift is located on cratonic crust with a thin and well-characterized Phanerozoic stratigraphy and tectonic history. On the other hand, the Neogene thermo-tectonic history of the rift has many parallels with the Basin and Range to the west. The geology of the southern Rio Grande rift is among the best characterized of any rift system in the world. Also, most geologic maps for the region are rather unique in that detailed analyses of Quaternary stratigraphic and surficial unit are added in concert with the details of bedrock geology. Pleistocene to Holocene entrenchment of the Rio Grande and tributaries unroofs the alteration signatures and permeability attributes of paleo outflow plumes and upflow zones, associated with present-day, but hidden or ''blind,'' hydrothermal systems at Rincon and San Diego Mountain.

James C Witcher

2002-07-30T23:59:59.000Z

340

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dams Second Powerhouse, Columbia River  

DOE Green Energy (OSTI)

A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dams Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites Range D 122 m directly downstream from the existing sluice chute outfall and Range F 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists Adjustable Cantilever and Mid-Level Cantilever. The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at Bonneville Dam.

Johnson, Gary E.; Ebberts, Blaine D.; Giorgi, Albert E.; Kuhn, Karen; Lee, Randall T.; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado  

SciTech Connect

The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1996-06-01T23:59:59.000Z

342

Lake Roosevelt Fisheries Monitoring Progam; Thyroid-Induced Chemical Imprinting in Early Life Stages and Assessment of Smoltification in Kokanee Salmon Implications for Operating Lake Roosevelt Kokanee Salmon Hatcheries; 1993 Supplement Report.  

DOE Green Energy (OSTI)

In 1991, two hatcheries were built to provide a kokanee salmon and rainbow trout fishery for Lake Roosevelt as partial mitigation for the loss of anadromous salmon and steelhead caused by construction of Grand Coulee Dam. The Sherman Creek Hatchery, located on a tributary of Lake Roosevelt to provide an egg collection and imprinting site, is small with limited rearing capability. The second hatchery was located on the Spokane Indian Reservation because of a spring water source that supplied cold, pure water for incubating and rearing eggs.`The Spokane Tribal Hatchery thus serves as the production facility. Fish reared there are released into Sherman Creek and other tributary streams as 7-9 month old fry. However, to date, returns of adult fish to release sites has been poor. If hatchery reared kokanee imprint to the hatchery water at egg or swim up stages before 3 months of age, they may not be imprinting as 7-9 month old fry at the time of stocking. In addition, if these fish undergo a smolt phase in the reservoir when they are 1.5 years old, they could migrate below Grand Coulee Dam and out of the Lake Roosevelt system. In the present investigation, which is part of the Lake Roosevelt monitoring program to assess hatchery effectiveness, kokanee salmon were tested to determine if they experienced thyroxine-induced chemical imprinting and smoltification similar to anadromous salmonids. Determination of the critical period for olfactory imprinting was determined by exposing kokanee to different synthetic chemicals (morpholine or phenethyl alcohol) at different life stages, and then measuring the ability to discriminate the chemicals as sexually mature adults. Whole body thyroxine content and blood plasma thyroxine concentration was measured to determine if peak thyroid activity coincided with imprinting or other morphological, physiological or behavioral transitions associated with smoltification.

Tilson, Mary Beth; Galloway, Heather; Scholz, Allan T. (Eastern Washington University, Upper Columbia United Tribes Fisheries Research Center, Cheney, WA)

1994-06-01T23:59:59.000Z

343

Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two spill conditions were to be systematically performed in alternating 2-day test intervals over the course of the spring outmigration. High flow conditions in 2012 interrupted the spill study. Dam passage survival was therefore estimated season-wide regardless of spill conditions.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Ploskey, Gene R.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

344

Investigations into the Early Life History of Naturally Produced Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Subbasin, Annual Report 2008 : Project Period 1 February 2008 to 31 January 2009.  

DOE Green Energy (OSTI)

This study was designed to document and describe the status and life history strategies of spring Chinook salmon and summer steelhead in the Grande Ronde River Subbasin. We determined migration timing, abundance, and life-stage survival rates for juvenile spring Chinook salmon Oncorhynchus tshawytscha and summer steelhead O. mykiss in four streams during migratory year 2008 from 1 July 2007 through 30 June 2008. As observed in previous years of this study, spring Chinook salmon and steelhead exhibited fall and spring movements out of natal rearing areas, but did not begin their smolt migration through the Snake and lower Columbia River hydrosystem until spring. In this report we provide estimates of migrant abundance and migration timing for each study stream, and their survival and timing to Lower Granite Dam. We also document aquatic habitat conditions using water temperature and stream flow in four study streams in the subbasin.

Yanke, Jeffrey A.; Alfonse, Brian M.; Bratcher, Kyle W. [Oregon Department of Fish and Wildlife

2009-07-31T23:59:59.000Z

345

Finite element methods for unsaturated porous solids and their application to dam engineering problems  

Science Conference Proceedings (OSTI)

This work presents a finite element formulation of equations proposed in a companion paper to describe the hyperelastic response of three-phase porous media. Attention is paid to the development of consistent tangents required by the Newton-Raphson procedure ... Keywords: Concrete dams, Hydro-mechanical coupling, Multiphase porous media, Rock mass permeability, Unilateral constraints

C. Callari; A. Abati

2009-04-01T23:59:59.000Z

346

THE VALUE OF THE HIGH ASWAN DAM TO THE EGYPTIAN ECONOMY  

E-Print Network (OSTI)

The High Aswan Dam converted a variable and uncertain flow of river water into a predictable and controllable flow. We use a computable general equilibrium model of the Egyptian economy to estimate the economic impact of the High Aswan Dam. We compare the 1997 economy as it was to the 1997 economy as it would have been for 72 historical, pre-dam water flows. The steady water flow increased transport productivity, while the seasonal shift in water supply allowed for a shift towards more valuable summer crops. These static effects are worth LE 4.9 billion. Investments in transport and agriculture increased as a consequence. Assuming that Egypt is a small open economy, this is worth another LE 1.1 billion. The risk premium on the reduced variability is estimated to be LE 1.1 billion for a modest risk aversion, and perhaps LE 4.4 billion for a high risk aversion. The total gain of LE 7.1 billion equals 2.7 % of GDP. Key words Egypt, High Aswan Dam, computable general equilibrium model, risk premium, water supply

Kenneth M. Strzepek A; Gary W. Yohe D; Richard S. J. Tol E; Mark Rosegrant B

2006-01-01T23:59:59.000Z

347

Guidelines for Drilling and Testing Core Samples at Concrete Gravity Dams  

Science Conference Proceedings (OSTI)

Regulatory agencies for dam safety often require stability data on concrete and foundation conditions--data obtained by testing core samples and taking various site measurements. These guidelines offer field-proven methods for compiling reliable results, with adequate documentation to support utility claims.

1989-05-01T23:59:59.000Z

348

A Theoretical Study of Cold Air Damming with Upstream Cold Air Inflow  

Science Conference Proceedings (OSTI)

The previously developed two-layer model of cold air damming is extended to include upstream cold air inflow. The upper layer is an isentropic cross-mountain flow. The lower layer is a cold boundary layer flow partially blocked by a two-...

Qin Xu; Shouting Gao; Brian H. Fiedler

1996-01-01T23:59:59.000Z

349

Spatial variability of sea level rise due to water impoundment behind dams  

E-Print Network (OSTI)

; Church and White, 2006]. This rate may be currently accelerating due to an increased influence of climate reservoirs (based on the work by Vorosmarty et al. [1997]), which are used in this paper's calculations. (b 1a), and added six additional post1997 dams from Chao et al. [2008] (specifically, the Three Gorges

Conrad, Clint

350

Sedimentology of Pennsylvanian sandstone from bedding-plane exposures, Laurel dam spillway, eastern Kentucky Coalfield  

SciTech Connect

Exposures of bedding planes in a coarsening-upward sequence of the Breathitt Formation at the Laurel Dam spillway in Whitley County, Kentucky, were analyzed by surveying a 250,000-ft{sup 2} area on a 10-ft grid and mapping within grids.

Greb, S.F.; Chesnut, D.R. Jr. (Kentucky Geological Survey, Lexington (USA))

1989-08-01T23:59:59.000Z

351

Juvenile Radio-Tag Study: Lower Granite Dam, 1985 Annual Report.  

DOE Green Energy (OSTI)

The concept of using mass releases of juvenile radio tags represents a new and potentially powerful research tool that could be effectively applied to juvenile salmonid passage problems at dams on the Columbia and Snake Rivers. A system of detector antennas, strategically located, would automatically detect and record individually tagged juvenile salmonids as they pass through the spillway, powerhouse, bypass system, or tailrace areas below the dam. Accurate measurements of spill effectiveness, fish guiding efficiency (FGE), collection efficiency (CE), spillway survival, powerhouse survival, and bypass survival would be possible without handling large numbers of unmarked fish. A prototype juvenile radio-tag system was developed and tested by the National Marine Fisheries Service (NMFS) and Bonneville Power Administration (BPA) at John Day Dam and at Lower Granite Dam. This report summarizes research to: (1) evaluate the effectiveness of the prototype juvenile radio-tag system in a field situation and (2) to test the basic assumptions inherent in using the juvenile radio tag as a research tool.

Stuehrenberg, Lowell C.

1986-06-01T23:59:59.000Z

352

Effect of superficial insulation on roller-compacted concrete dams in cold regions  

Science Conference Proceedings (OSTI)

Superficial insulation is often used to prevent cracking of concrete dams located in cold regions. In this study, surface temperatures with and without heat insulation during the overwintering period are calculated. Using the material properties of roller-compacted ... Keywords: Superficial crack, Superficial insulation, Temperature difference, Temperature field, Thermal stress, Three-dimensional finite element relocating mesh method

Xiao-fei Zhang; Shou-yi Li; Yan-long Li; Yao Ge; Hui Li

2011-11-01T23:59:59.000Z

353

Critical gravity as van Dam-Veltman-Zakharov discontinuity in anti de Sitter space  

E-Print Network (OSTI)

We consider critical gravity as van Dam-Vletman-Zakharov (vDVZ) discontinuity in anti de Sitter space. For this purpose, we introduce the higher curvature gravity. This discontinuity can be confirmed by calculating the residues of relevant poles explicitly. For the non-critical gravity of $0gravity.

Yun Soo Myung

2011-07-18T23:59:59.000Z

354

AN ESTIMATE OF MORTALITY OF CHINOOK SALMON IN THE COLUMBIA RIVER NEAR BONNEVILLE DAM DURING THE  

E-Print Network (OSTI)

et al., 1983) Offset Center of Gravity (OCOG) (Bamber, 1994) Leading edge position = Position-7 km does not provide a complete picture of the vector field of ocean currents and gravity anomalies CHINA'S POYANG LAKE (2002­2007) Long Kou Gauge Pass 163 Pass 980 #12;Satellite Altimetry Based Dam

355

Uplift Pressures in Cracks in Concrete Gravity Dams--An Experimental Study: Volume 8  

Science Conference Proceedings (OSTI)

Uplift pressure distribution in cracks in concrete dams is affected by a combination of several factors, such as crack properties, drain dimensions, and the type of flow in the crack. This study shows that most uplift pressure distributions can be controlled using a vertical drain system with diameters from two to four inches and spacing of about ten feet.

1992-12-20T23:59:59.000Z

356

Assessment of Natural Stream Sites for Hydroelectric Dams in the Pacific Northwest Region  

DOE Green Energy (OSTI)

This pilot study presents a methodology for modeling project characteristics using a development model of a stream obstructing dam. The model is applied to all individual stream reaches in hydrologic region 17, which encompasses nearly all of Idaho, Oregon, and Washington. Project site characteristics produced by the modeling technique include: capacity potential, principal dam dimensions, number of required auxiliary dams, total extent of the constructed impoundment boundary, and the surface area of the resulting reservoir. Aggregated capacity potential values for the region are presented in capacity categories including total, that at existing dams, within federal and environmentally sensitive exclusion zones, and the balance which is consider available for greenfield development within the limits of the study. Distributions of site characteristics for small hydropower sites are presented and discussed. These sites are screened to identify candidate small hydropower sites and distributions of the site characteristics of this site population are presented and discussed. Recommendations are made for upgrading the methodology and extensions to make the results more accessible and available on a larger scale.

Douglas G. Hall; Kristin L. Verdin; Randy D. Lee

2012-03-01T23:59:59.000Z

357

UMTRA project water sampling and analysis plan, Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

Surface remedial action will be completed at the Grand Junction processing site during the summer of 1994. Results of 1993 water sampling indicate that ground water flow conditions and ground water quality at the processing site have remained relatively constant with time. Uranium concentrations in ground water continue to exceed the maximum concentration limits, providing the best indication of the extent of contaminated ground water. Evaluation of surface water quality of the Colorado River indicate no impact from uranium processing activities. No compliance monitoring at the Cheney disposal site has been proposed because ground water in the Dakota Sandstone (uppermost aquifer) is classified as limited-use (Class 111) and because the disposal cell is hydrogeologically isolated from the uppermost aquifer. The following water sampling and water level monitoring activities are planned for calendar year 1994: (i) Semiannual (early summer and late fall) sampling of six existing monitor wells at the former Grand Junction processing site. Analytical results from this sampling will be used to continue characterizing hydrogeochemical trends in background ground water quality and in the contaminated ground water area resulting from source term (tailings) removal. (ii) Water level monitoring of approximately three proposed monitor wells projected to be installed in the alluvium at the processing site in September 1994. Data loggers will be installed in these wells, and water levels will be electronically monitored six times a day. These long-term, continuous ground water level data will be collected to better understand the relationship between surface and ground water at the site. Water level and water quality data eventually will be used in future ground water modeling to establish boundary conditions in the vicinity of the Grand Junction processing site. Modeling results will be used to help demonstrate and document the potential remedial alternative of natural flushing.

Not Available

1994-07-01T23:59:59.000Z

358

Gravitational Collapse and Radiation of Grand Unified Theory  

E-Print Network (OSTI)

The infinite gravitational collapse of any supermassive stars should pass through an energy scale of the grand unified theory (GUT). After nucleon-decays, the supermassive star will convert nearly all its mass into energy, and produce the radiation of GUT. It may probably explain some ultrahigh energy puzzles in astrophysics, for example, quasars and gamma-ray bursts (GRB), etc. This is similar with a process of the Big Bang Universe with a time-reversal evolution in much smaller space scale and mass scale. In this process the star seems be a true white hole.

Yi-Fang Chang

2007-10-02T23:59:59.000Z

359

Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

2001-04-01T23:59:59.000Z

360

Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003  

DOE Green Energy (OSTI)

This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

2005-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

A Grand Delta(96) x SU(5) Flavour Model  

E-Print Network (OSTI)

Recent results from the Daya Bay and RENO reactor experiments have measured the smallest lepton mixing angle and found it to have a value of theta_13 approximately 9 degrees. This result presents a new challenge for the existing paradigms of discrete flavour symmetries which attempt to describe all quark and lepton masses and mixing angles. Here we propose a Supersymmetric Grand Unified Theory of Flavour based on Delta(96) x SU(5), together with a U(1) x Z3 symmetry, including a full discussion of Delta(96) in a convenient basis. The Grand Delta(96) x SU(5) Flavour Model relates the quark mixing angles and masses in the form of the Gatto-Sartori-Tonin relation and realises the Georgi-Jarlskog mass relations between the charged leptons and down-type quarks. We predict a Bi-trimaximal (not Tri-bimaximal) form of neutrino mixing matrix, which, after including charged lepton corrections with zero phase, leads to the following GUT scale predictions for the atmospheric, solar, and reactor mixing angles: theta_23=36...

King, Stephen F; Stuart, Alexander J

2012-01-01T23:59:59.000Z

362

A Grand Delta(96) x SU(5) Flavour Model  

E-Print Network (OSTI)

Recent results from the Daya Bay and RENO reactor experiments have measured the smallest lepton mixing angle and found it to have a value of theta_13 approximately 9 degrees. This result presents a new challenge for the existing paradigms of discrete flavour symmetries which attempt to describe all quark and lepton masses and mixing angles. Here we propose a Supersymmetric Grand Unified Theory of Flavour based on Delta(96) x SU(5), together with a U(1) x Z3 symmetry, including a full discussion of Delta(96) in a convenient basis. The Grand Delta(96) x SU(5) Flavour Model relates the quark mixing angles and masses in the form of the Gatto-Sartori-Tonin relation and realises the Georgi-Jarlskog mass relations between the charged leptons and down-type quarks. We predict a Bi-trimaximal (not Tri-bimaximal) form of neutrino mixing matrix, which, after including charged lepton corrections with zero phase, leads to the following GUT scale predictions for the atmospheric, solar, and reactor mixing angles: theta_23=36.9 degrees, theta_12=32.7 degrees and theta_13=9.6 degrees, in good agreement with recent global fits, and a zero Dirac CP phase delta~0.

Stephen F. King; Christoph Luhn; Alexander J. Stuart

2012-07-24T23:59:59.000Z

363

Geomorphology of plutonium in the Northern Rio Grande  

Science Conference Proceedings (OSTI)

Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

Graf, W.L. [Arizona Univ., Tempe, AZ (United States). Dept., of Geography] Arizona Univ., Tempe, AZ (United States). Dept., of Geography

1993-03-01T23:59:59.000Z

364

SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Grand Challenge Highlights Ambitious Efforts along the SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Ramamoorthy Ramesh Former Director, SunShot Initiative & Solar Energy Technologies Program What are the key facts? Today at the SunShot Grand Challenge Summit Energy Secretary Chu announced up to $8 million to support clean energy startups. Secretary Chu also announced a nationwide competition to drive down

365

Kalispel Tribe of Indians Wildlife Mitigation and Restoration for Albeni Falls Dam: Flying Goose Ranch Phase I.  

DOE Green Energy (OSTI)

This report is a recommendation from the Kalispel Tribe to the Northwest Power Planning Council (NPPC) for wildlife habitat mitigation for the extensive habitat losses caused by Albeni Falls Dam on and near the Kalispel Indian Reservation.

Merker, Christopher

1993-02-01T23:59:59.000Z

366

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010  

SciTech Connect

The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

2012-11-15T23:59:59.000Z

367

Chemical Imaging Infrastructure Research Team: Carina Lansing, Zoe Guillen, Kerstin Kleese-van Dam, Shaun O'Leary  

E-Print Network (OSTI)

Chemical Imaging Infrastructure Research Team: Carina Lansing, Zoe Guillen, Kerstin Kleese-van Dam, Shaun O'Leary Purpose Support real-time analysis of single and multi-modal chemical imaging experiments

368

An Analysis of the Impact of a Split-Front Rainband on Appalachian Cold-Air Damming  

Science Conference Proceedings (OSTI)

Appalachian cold-air damming (CAD) is characterized by the development of a cool, stable air mass that is advected southwestward along the eastern slopes of the Appalachian Mountains by low-level ageostrophic flow. Operational forecasters have ...

Michael J. Brennan; Gary M. Lackmann; Steven E. Koch

2003-10-01T23:59:59.000Z

369

The Feasibility of Using an Ultrasonic Fish Tracking System in the Tailrace of Lower Granite Dam in 2002  

DOE Green Energy (OSTI)

This report describes a study conducted by PNNL in Spring 2002 at Lower Granite Dam on the Snake River for the US Army Corps of Engineers Portland District. Our goal was to determine the feasibility of using ultrasonic fish tracking in the untested environment of a hydroelectric dam tailrace. If fish tracking were determined to be feasible, we would track the movement of juvenile hatchery chinook (Oncorhynchus tshawytscha), juvenile hatchery steelhead (O. mykiss), and juvenile wild steelhead (O. mykiss) and relate their movement to dam operations. The majority of fish to be tracked were released as a part of a separate study conducted by the Biological Resources Division of the U.S. Geological Survey (BRD), which was investigating the movement of juvenile salmon in the forebay of Lower Granite Dam in relation to Removable Spillway Weir (RSW) testing. The two studies took place consecutively from April 14 to June 7, 2002.

Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.; Cash, Kenneth; Zimmerman, Shon A.

2003-09-10T23:59:59.000Z

370

2011 Annual Planning Summary for Office of Legacy Management (LM), Grand Junction (See LM APS)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Legacy Management (LM), Grand Junction (See LM APS).

371

Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012  

Science Conference Proceedings (OSTI)

The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACEs continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Hughes, James S.; Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Carpenter, Scott M.; Hennen, Matthew J.; Fischer, Eric S.; Batton, George; Carlson, Thomas J.; Cushing, Aaron W.; Deng, Zhiqun; Etherington, D. J.; Fu, Tao; Greiner, Michael J.; Ingraham, John M.; Kim, Jin A.; Li, Xi; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Seaburg, Adam; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Zimmerman, Shon A.

2013-12-23T23:59:59.000Z

372

MISCELLANEOUS PAPER S71-17 EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL DAMS  

Office of Legacy Management (LM)

MISCELLANEOUS PAPER S71-17 MISCELLANEOUS PAPER S71-17 EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL DAMS Report 2 ANALYSIS OF RESPONSE O F RIFLE.GAP D A M TO PROJECT RULISON UNDERGROUND NUCLEAR DETONATION bv J. E. Ahlberg, J. Fowler, L W. Heller ........ . . . . . . . . - . . . . . . . . . . . . . . . - . . - ...... *- , .... . . . - ->-w-J- * - : - . . June 1972 s~omsored by Office, Chief of Engineers, U. S. Army Conducted by U. S. A m y Engineer Waterways Experiment Station Soils and Pavements Laboratory Vicksburg, Mississippi APPROVED FOR WBLlC RELEASE: DISTRIBUTION UNLIMITED L i s t o f Associated Reports Previous reports under Engineering Study 540 are: "A Comparative Summary o f Current Earth Dam Analysis Methods for Earthquake Response," issued by Office, Chief o f Engineers, a s Inclosure 1 to Engineer

373

MHK Projects/Lock and Dam No 2 Hydroelectric Project | Open Energy  

Open Energy Info (EERE)

Lock and Dam No 2 Hydroelectric Project Lock and Dam No 2 Hydroelectric Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.7486,"lon":-92.8048,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

374

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

2012-09-01T23:59:59.000Z

375

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

2011-12-01T23:59:59.000Z

376

Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

1990-09-01T23:59:59.000Z

377

Integrated Reservoir Characterization: Offshore Louisiana, Grand Isle Blocks 32 & 33  

E-Print Network (OSTI)

This thesis integrated geology, geophysics, and petroleum engineering data to build a detailed reservoir characterization models for three gas pay sands in the Grand Isle 33 & 43 fields, offshore Louisiana. The reservoirs are Late Miocene in age and include the upper (PM), middle (QH), and lower (RD) sands. The reservoir models address the stratigraphy of the upper (PM) sand and help delineate the lower (RD) reservoir. In addition, this research addresses the partially depleted QH-2 reservoir compartment. The detailed models were constructed by integrating seismic, well log, and production data. These detailed models can help locate recoverable oil and gas that has been left behind. The upper PM model further delineated that the PM sand has several areas that are shaled-out effectively creating a flow barrier within reservoir compartments. Due to the barrier in the PM-1 reservoir compartment, an area of potentially recoverable hydrocarbons remains. In Grand Isle 33, the middle QH sand was partially depleted in the QH-2 reservoir compartment by a series of development wells. Bottom hole pressure data from wells in Grand Isle 32 & 33 reveal that the two QH fault compartments are in communication across a leaking fault. Production wells in the QH-1 compartment produced reserves from the QH-2 compartment. The lower RD sand model helped further delineate the reservoir in the RD-2 compartment and show that this compartment has been depleted. The RD model also shows the possible presence of remaining recoverable hydrocarbons in the RD-1 compartment. It is estimated that about 6.7 billion cubic feet of gas might remain within this reservoir waiting to be recovered. A seismic amplitude anomaly response from the QH and RD sands is interpreted to be a lithologic indicator rather than the presence of hydrocarbons. Amplitude response from the PM level appears to be below the resolution of the seismic data. A synthetic seismogram model was generated to represent the PM and surrounding sands. This model shows that by increasing the frequency of the seismic data from 20 Hz to a dominant frequency of 30 Hz that the PM and surrounding sands could be seismically resolvable. Also the PM-1 compartment has possible recoverable hydrocarbons of 1.5 billion cubic feet of gas remaining.

Casey, Michael Chase

2011-05-01T23:59:59.000Z

378

Fish Passage Improvements at Three Mile Falls Diversion Dam, Umatilla River, Oregon, Final Completion Report.  

DOE Green Energy (OSTI)

This report contains the results and conclusions from the biological assessment and outlines several alternative plans for solving fish passage problems at the dam. A recommended plan, based on consensus of the fisheries agencies and the tribes, is described, and the rationale for that decision is discussed. Data needs for final designs, a tentative construction schedule, and a discussion of operation and maintenance needs are presented.

Unknown Author

1985-05-01T23:59:59.000Z

379

Seismic analysis of the Par Pond Dam: Study of slope failure and liquefaction. Technical evaluation report  

SciTech Connect

Stability concerns of the Par Pond Dam, an embankment structure in the Savannah River Site complex, resulted in a comprehensive evaluation of the state of its integrity. Specifically, excessive seepage through the embankment, slope failure due to an earthquake event as well as liquefaction potential of the embankment and the foundation are addressed and the potential of failure is evaluated. Lastly, remedial benefits of the addition of a berm structure are also assessed.

Simos, N.; Reich, M.

1994-07-01T23:59:59.000Z

380

Scientific substantiation of safe operation of the Earthen Dams at the Votkinsk HPP  

Science Conference Proceedings (OSTI)

Over a period of 15 years, coworkers of the B. E. Vedeneev Scientific-Research Institute of Hydraulic Engineering have conducted scientific accompaniment of the operation of the earthen dams at the Votkinsk HPP. During that time, basic performance characteristics associated with complex hydrogeologic and hydrochemical conditions, and the forms of their unfavorable manifestations influencing the reliability and safety of the structures were revealed, and, recommendations and measures were developed for their elimination.

Deev, A. P.; Fisenko, V. F. [Votkinsk HPP Branch of the JSC 'RusGidro,' Chaikovskii (Russian Federation); Sol'skii, S. V.; Lopatina, M. G.; Gints, A. V.; Aref'eva, A. N. [JSC 'VNIIG im. B. E. Vedeneeva', Branch of JSC 'RusGidro' (Russian Federation)

2012-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility  

Science Conference Proceedings (OSTI)

The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction.

Queen, R.L.

1991-06-01T23:59:59.000Z

382

Grand Ridge III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

III Wind Farm III Wind Farm Facility Grand Ridge III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

383

Grand Rapids Public Util Comm | Open Energy Information  

Open Energy Info (EERE)

Rapids Public Util Comm Rapids Public Util Comm Jump to: navigation, search Name Grand Rapids Public Util Comm Place Minnesota Utility Id 7489 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png CITY COMMERCIAL Commercial CITY LIGHT & POWER Lighting CITY RESIDENTIAL Residential CONTROLLED WATER HEATING (CITY) Commercial CONTROLLED WATER HEATING (RURAL) Commercial ENTERTAINMENT LIGHTING RATE (CITY) Lighting ENTERTAINMENT LIGHTING RATE (RURAL) Lighting INDUSTRIAL (CITY) Industrial

384

City of Grand Marais, Minnesota (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Marais, Minnesota (Utility Company) Marais, Minnesota (Utility Company) Jump to: navigation, search Name City of Grand Marais Place Minnesota Utility Id 7487 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL - SINGLE PHASE Commercial COMMERCIAL - THREE PHASE Commercial DUAL FUEL(Single Phase) DUAL FUEL(Three Phase) RESIDENTIAL - SINGLE PHASE Residential RESIDENTIAL - THREE PHASE Residential YARD LIGHT METERED Lighting YARD LIGHT UNMETERED Lighting

385

Grand Valley Rrl Pwr Line, Inc | Open Energy Information  

Open Energy Info (EERE)

Pwr Line, Inc Pwr Line, Inc Jump to: navigation, search Name Grand Valley Rrl Pwr Line, Inc Place Colorado Utility Id 7563 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial and Small Power Service, Three Phase Schedule (25)-CSP-1 Commercial Farm and Home (Residential) Service Schedule (10)-FH-1 Residential Industrial Service Schedule (50) -IND-1 Industrial Irrigation Service Schedule (40)-I-1 Commercial Large Power Service Schedule (30) -LP-1 Industrial Nonresidential - General Schedule (20)-NRG-1 Commercial

386

City of East Grand Forks, Minnesota (Utility Company) | Open Energy  

Open Energy Info (EERE)

Minnesota (Utility Company) Minnesota (Utility Company) Jump to: navigation, search Name East Grand Forks City of Place Minnesota Utility Id 5575 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Rate Commercial Off Peak Rates Commercial Residential Electric Heat Residential Residential General Electric Residential Small Commercial Rate Residential Average Rates Residential: $0.0943/kWh Commercial: $0.0740/kWh Industrial: $0.0789/kWh

387

EV Everywhere Grand Challenge - Electric Motors and Critical Materials Breakout  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Motors and Critical Electric Motors and Critical Materials Breakout Laura Marlino Oak Ridge National Laboratory Iver Anderson Ames Laboratory Facilitators July 24, 2012 EV Everywhere Grand Challenge Vehicle Technologies Program - Advanced Power Electronics and Electric Motors eere.energy.gov Electric Drive Status and Targets Current Status* PHEV 40** AEV 100** AEV 300+ System Cost $/kW 20 ($1100) 5 ($600) 14 ($1680) 4 ($600) Motor Specific Power kW/kg 1.3 1.9 1.5 2 PE Specific Power kW/kg 10.5 16 12 16.7 System Peak Efficiency % 90 97 91 98 2022 EV Everywhere Targets Extremely Aggressive Targets Especially Challenging for the Electric Motor * 55kW system ** 120kW system + 150 kW system Vehicle Technologies Program - Advanced Power Electronics and Electric Motors eere.energy.gov

388

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H.

2008-12-30T23:59:59.000Z

389

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H. [Oregon Department of Fish and Wildlife

2009-07-01T23:59:59.000Z

390

SU(5) x Z{sub 13} grand unification model  

SciTech Connect

We propose an SU(5) grand unified model with an invisible axion and the unification of the three coupling constants which is in agreement with the values, at M{sub Z}, of {alpha}, {alpha}{sub s}, and sin{sup 2}{theta}{sub W}. A discrete, anomalous, Z{sub 13} symmetry implies that the Peccei-Quinn symmetry is an automatic symmetry of the classical Lagrangian protecting, at the same time, the invisible axion against possible semiclassical gravity effects. Although the unification scale is of the order of the Peccei-Quinn scale the proton is stabilized by the fact that in this model the standard model fields form the SU(5) multiplets completed by new exotic fields and, also, because it is protected by the Z{sub 13} symmetry.

Dias, Alex G. [Centro de Ciencias Naturais e Humanas, Universidade Federal do ABC, Rua Santa Adelia 166, 09210-170, Santo Andre, SP (Brazil); Franco, Edison T.; Pleitez, Vicente [Instituto de Fisica Teorica, Universidade Estadual Paulista, Rua Pamplona 145, 01405-900, Sao Paulo, SP (Brazil)

2007-12-01T23:59:59.000Z

391

An SU(5)$\\otimes$Z_{13} Grand Unification Model  

E-Print Network (OSTI)

We propose an SU(5) grand unified model with an invisible axion and the unification of the three coupling constants which is in agreement with the values, at $M_Z$, of $\\alpha$, $\\alpha_s$, and $\\sin^2\\theta_W$. A discrete, anomalous, $Z_{13}$ symmetry implies that the Peccei-Quinn symmetry is an automatic symmetry of the classical Lagrangian protecting, at the same time, the invisible axion against possible semi-classical gravity effects. Although the unification scale is of the order of the Peccei-Quinn scale the proton is stabilized by the fact that in this model the standard model fields form the SU(5) multiplets completed by new exotic fields and, also, because it is protected by the $Z_{13}$ symmetry.

Alex G. Dias; Edison T. Franco; Vicente Pleitez

2007-08-07T23:59:59.000Z

392

A Graphical representation of the grand canonical partition function  

E-Print Network (OSTI)

In this paper we consider a stochastic partial differential equation defined on a Lattice $L_\\delta$ with coefficients of non-linearity with degree $p$. An analytic solution in the sense of formal power series is given. The obtained series can be re-expressed in terms of rooted trees with two types of leaves. Under the use of the so-called Cole-Hopf transformation and for the particular case $p=2$, one thus get the generalized Burger equation. A graphical representation of the solution and its logarithm is done in this paper. A discussion of the summability of the previous formal solutions is done in this paper using Borel sum. A graphical calculus of the correlation function is given. The special case when the noise is of L\\'evy type gives a simplified representations of the solution of the generalized Burger equation. From the previous results we recall a graphical representation of the grand canonical partition function.

Boubaker Smii

2010-01-07T23:59:59.000Z

393

Higgs-boson effects in grand unified theories  

DOE Green Energy (OSTI)

It is argued that fine tuning of a minimal set of parameters, needed to fix the hierarchy of gauge-boson masses and a knowledge of intermediate symmetry groups, leads to ''natural'' mass scales for physical Higgs bosons in grand unified theories. This is applied to ..delta..B = 2 transitions in models based on SU(5), SO(10), SU(16), and (SU(2N))/sup 4/. It turns out that the Higgs bosons which mediate ..delta..B = 2 neutron-antineutron and hydrogen-antihydrogen oscillations become superheavy, and so such transitions can be observable only in theories with low unification scales, such as SU(16) and (SU(8))/sup 4/, if we adhere to the hypothesis of minimal fine tuning.

Mohapatra, R.N.; Senjanovic, G.

1983-04-01T23:59:59.000Z

394

Heating facilities for the MGM Grand Hotel, Reno, Nevada  

SciTech Connect

The MGM Grand Hotel-Reno is located adjacent to an area with a well-documented geothermal resource. Currently, there is a number of entities seeking to determine the exact nature of the resource at the MGM site. This report concerns itself with identifying current natural gas loads within the MGM complex which could be met by geothermal should a source become available. The two principle assumptions upon which the following material is based are (1) that a source of 190/sup 0/F or higher temperature water is available and (2) all systems discussed would be installed in parallel with existing systems. That is, existing systems would remain in place providing 100 percent backup for the geothermal systems.

1981-09-01T23:59:59.000Z

395

Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam  

DOE Green Energy (OSTI)

At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.

Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

2007-01-30T23:59:59.000Z

396

Is there a grand challenge or X-prize for data mining?  

Science Conference Proceedings (OSTI)

This panel will discuss possible exciting and motivating Grand Challenge problems for Data Mining, focusing on bioinformatics, multimedia mining, link mining, text mining, and web mining. Keywords: X-prize, bioinformatics, data mining, grand challenge, image mining, link mining, multimedia mining, text mining, video mining, web mining

Gregory Piatetsky-Shapiro; Robert Grossman; Chabane Djeraba; Ronen Feldman; Lise Getoor; Mohammed Zaki

2006-08-01T23:59:59.000Z

397

Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005  

SciTech Connect

The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an experiment using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The Dalles Dam sluiceway to be highly efficient and effective at passing juvenile salmonids. 6) Consider the following elements for surface flow bypasses during design of any sluiceway enhancements at The Dalles Dam: Form an extensive surface flow bypass flow net (surface bypass discharge greater than ~7% of total project discharge) at both west and east ends of the dam; Create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s per meter); Make water velocities at an entrance high enough (> 3 m/s) to entrain the subject juvenile fishes, e.g., 10,000 cfs or so; Adapt the shape and orientation of the surface entrance(s) to fit site-specific features, i.e., test a Removable Sluiceway Weir. 7)The Dalles Dam sluiceway has potential to be highly efficient and effective at passing juvenile salmonids. We recommend tapping this potential with enhancements to the sluiceway.

Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

2006-06-01T23:59:59.000Z

398

Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005  

Science Conference Proceedings (OSTI)

The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an experiment using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The Dalles Dam sluiceway to be highly efficient and effective at passing juvenile salmonids. 6) Consider the following elements for surface flow bypasses during design of any sluiceway enhancements at The Dalles Dam: Form an extensive surface flow bypass flow net (surface bypass discharge greater than ~7% of total project discharge) at both west and east ends of the dam; Create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile fishes, e.g., 10,000 cfs or so; Adapt the shape and orientation of the surface entrance(s) to fit site-specific features, i.e., test a Removable Sluiceway Weir. 7)The Dalles Dam sluiceway has potential to be highly efficient and effective at passing juvenile salmonids. We recommend tapping this potential with enhancements to the sluiceway.

Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

2006-06-01T23:59:59.000Z

399

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010  

DOE Green Energy (OSTI)

This report presents the results of an evaluation of juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers, Portland District (USACE). The goal of the study was to provide fish passage and distribution data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACEs Willamette Valley Project in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. During the year-long study period - February 1, 2010 to January 31, 2011the objectives of the hydroacoustic evaluation of fish passage and distribution at LOP were to: 1. Estimate passage rates, run timing, horizontal distribution, and diel distribution at turbine penstock intakes for smolt-size fish. 2. Estimate passage rates, run timing and diel distribution at turbine penstock intakes for small-size fish. 3. Estimate passage rates and run timing at the regulating outlets for smolt-size fish. 4. Estimate vertical distribution of smolt-size fish in the forebay near the upstream face of the dam. The fixed-location hydroacoustic technique was used to accomplish the objectives of this study. Transducers (420 kHz) were deployed in each penstock intake, above each RO entrance, and on the dam face; a total of nine transducers (2 single-beam and 7 split-beam) were used. We summarize the findings from the hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011 as follows. Fish passage rates for smolt-size fish (> ~90 mm) were highest during December-January and lowest in mid-summer through early fall. During the entire study period, an estimated total of 142,463 fish 4,444 (95% confidence interval) smolt-size fish passed through turbine penstock intakes. Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. Run timing for small-size fish (~65-90 mm) peaked (702 fish) on December 18. Downstream passage of small-size juvenile fish was variable, occurring on two days in the spring, eight days in the summer, and at times throughout late fall and winter. A total of 7,017 690 small-size fish passed through the turbine penstock intakes during the study period. Relatively few fish passed into the ROs when they were open in summer (2 fish/d) and winter (8 fish/d). Fish were surface-oriented with 62-80% above 10 m deep. The highest percentage of fish (30-60%) was in the 5-10 m depth bin. We draw the following conclusions from the study. The non-obtrusive hydroacoustic data from this study are reliable because passage estimates and patterns were similar with those observed in the direct capture data from the tailrace screw trap and were consistent with distribution patterns observed in other studies of juvenile salmonid passage at dams. Fish passage at LOP was apparently affected but not dominated by dam operations and reservoir elevation. The surface-oriented vertical distribution of fish we observed supports development of surface passage or collector devices. In summary, the high-resolution spatially and temporally data reported herein provide detailed estimates of vertical, horizontal, diel, daily, and seasonal passage and distributions at LOP during March 2010 through January 2011. This information is applicable to management decisions on design and development of surface passage and collections devices to help restore Chinook salmon populations in the Middle Fork Willamette River watershed above Lookout Point Dam.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

2011-07-01T23:59:59.000Z

400

An applied paleoecology case study: Bahia Grande, Texas prior to construction of the Brownsville Ship Channel  

E-Print Network (OSTI)

Bahia Grande is a large lagoon located within Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. When the Brownsville Ship Channel was built along the southern end of the lagoon in 1936, Bahia Grande was cut off from the marine water of Laguna Madre. Since that time, Bahia Grande has been primarily dry with only ephemeral fresh water coming from heavy rainfall events, resulting in a severe decline in biological productivity. A restoration project led by the U.S. Fish and Wildlife Service has proposed to cut new channels between Bahia Grande and the Ship Channel to restore the connection with Laguna Madre. This is a large-scale project with major implications for the water quality, surrounding ecology, and associated biota in the region. Unfortunately, because very little is known about Bahia Grande prior to isolation, it is difficult to predict whether the results of the restoration will be comparable to the pre-Ship Channel environment. Paleoecological data provide the best opportunity to understand what Bahia Grande was like in the past. This study uses statistical analyses of the molluscan death assemblages from Bahia Grande to gain a better understanding of the environmental conditions in the lagoon before it was isolated. The first question addressed is how does Bahia Grande relate to other water bodies on the Texas coast? This may provide a modern analog to the past conditions in Bahia Grande. The second question inquires whether there are any local patterns or variations within Bahia Grande and several smaller surrounding lagoons. These results provide an important baseline for comparison with the restored lagoon. The results of this investigation show that, in a regional context, Bahia Grande was most similar to Alazan Bay and Baffin Bay, which are mostly enclosed shallow bays with high salinities due to the arid climate and limited freshwater inflow. Within Bahia Grande, there are several distinct molluscan assemblages. Salinity and water coverage are the most likely environmental factors responsible for the differences within Bahia Grande. Additionally, data from surrounding lagoons strongly indicate that some connections with Bahia Grande existed in the past.

Lichlyter, Stephen Alvah

2003-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Deliver Keynote on EV Everywhere Grand Challenge to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show January 30, 2013 - 1:37pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Tomorrow, Thursday, January 31, 2013, Secretary Chu will deliver the government keynote address at the Washington Auto Show's Public Policy Day. His remarks will focus on the Energy Department's EV Everywhere Grand Challenge, including progress to date and a new initiative to strengthen American leadership in this rapidly growing global industry. Launched by President Obama in March 2012, EV-Everywhere is the second in a series of Energy Department "Clean Energy Grand Challenges" aimed at addressing the most pressing energy challenges of our time. The EV

402

Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) |  

Open Energy Info (EERE)

Rio Grande Rift Region (Aiken & Ander, 1981) Rio Grande Rift Region (Aiken & Ander, 1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) Exploration Activity Details Location Rio Grande Rift Geothermal Region Exploration Technique Ground Gravity Survey Activity Date Usefulness useful DOE-funding Unknown References Carlos L.V. Aiken, Mark E. Ander (1981) A Regional Strategy For Geothermal Exploration With Emphasis On Gravity And Magnetotellurics Retrieved from "http://en.openei.org/w/index.php?title=Ground_Gravity_Survey_At_Rio_Grande_Rift_Region_(Aiken_%26_Ander,_1981)&oldid=401473" Category: Exploration Activities What links here Related changes Special pages Printable version

403

Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monitoring of the Airport Calibration Pads at Walker Field, Grand Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) More Documents & Publications Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report

404

Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001  

Office of Legacy Management (LM)

Grand Junction Disposal Site Grand Junction Disposal Site Uranium ore was processed at the Climax millsite at Grand Junction, Colorado, between 1951 and 1970. The milling operations created process-related waste and tailings, a sandlike material containing radioactive materials and other contaminants. The tailings were an ideal and inexpensive construction material suitable for concrete, mortar, and fill. Accordingly, the tailings were widely used in the Grand Junction area for these purposes. The U.S. Department of Energy (DOE) encapsulated the tailings and other contaminated materials from the millsite and more than 4,000 vicinity properties in the Grand Junction area in an engineered disposal cell. Part of the disposal cell was completed in 1994; the remainder of the cell remains open until it is

405

Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities Phase 1: The Dalles Dam Spillway Case Study  

DOE Green Energy (OSTI)

This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

Deng, Zhiqun; Serkowski, John A.; Fu, Tao; Carlson, Thomas J.; Richmond, Marshall C.

2007-12-31T23:59:59.000Z

406

Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1  

DOE Green Energy (OSTI)

This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

Carlson, Thomas J

2001-01-30T23:59:59.000Z

407

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam with Emphasis on the Prototype Surface Flow Outlet, 2008  

DOE Green Energy (OSTI)

The main purpose of the study was to evaluate the performance of Top Spill Weirs installed at two spillbays at John Day Dam and evaluate the effectiveness of these surface flow outlets at attracting juvenile salmon away from the powerhouse and reducing turbine passage. The Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate survival of juvenile salmonids passing the dam and also for calculating performance metrics used to evaluate the efficiency and effectiveness of the dam at passing juvenile salmonids.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Monter, Tyrell J.; Johnson, Gary E.; Khan, Fenton; Wilberding, Matthew C.; Cushing, Aaron W.; Zimmerman, Shon A.; Faber, Derrek M.; Durham, Robin E.; Townsend, Richard L.; Skalski, John R.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.

2009-12-01T23:59:59.000Z

408

Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program; Preliminary Environmental Assessment  

DOE Green Energy (OSTI)

As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), Bonneville Power Administration (BPA) must mitigate the loss of fish, wildlife, and related spawning grounds and habitat attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries. The federal dams have been identified as a major source of mortality for the listed Snake River salmon stocks. BPA also has responsibilities under the Endangered Species Act (ESA) of 1973 to operate in a way that does not jeopardize the continued existence of listed species and to use its agency resources to conserve listed species.

United States. Bonneville Power Administration.

1998-02-01T23:59:59.000Z

409

Characterization of Fish Passage Conditions through the Fish Weir and Turbine Unit 1 at Foster Dam, Oregon, Using Sensor Fish, 2012  

SciTech Connect

This report documents investigations of downstream fish passage research involving a spillway fish weir and turbine passage conditions at Foster Dam in May 2012.

Duncan, Joanne P.

2013-02-01T23:59:59.000Z

410

Grand Challenges Grand Challenges  

Science Conference Proceedings (OSTI)

... adversely impact oceans, groundwater systems, streams ... Vulnerability of Interdependent ... interdependent systems, additional vulnerabilities can be ...

2007-03-01T23:59:59.000Z

411

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Fish at Bonneville Dams Second Powerhouse, Columbia River  

DOE Green Energy (OSTI)

A site near the downstream tip of Cascades Island and a mid-level cantilever outfall type were selected for the high flow outfall of the new surface flow juvenile fish bypass at Bonneville Dams Second Powerhouse. The new bypass will be a modification of the existing ice and trash sluice chute, which discharges into the tailrace with jet impact on the bottom near a shoreline that predators inhabit. Thus, a new site and type are necessary for this high flow (> 28.3 m3/s) outfall. Technical guidelines on high flow outfall location and design were established and applied during the outfall development process. Critical design parameters included discharge at 150 m3/s, entry velocities approaching 15.2 m/s, and tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two sites Range D 121.9 m straight downstream from the existing outfall and Range F 760 m downstream near the tip of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. During successive screening, evaluation, consolidation, and selection stages, professional judgment and quantitative comparisons were used to select two finalists Adjustable Cantilever and Mid-Level Cantilever. The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models. The process resulted in selection of a mid-level cantilever with plunge pool at the tip of Cascades Island. The system is scheduled for completion in March 2004.

Johnson, Gary E.; Ebberts, Blaine; Giorgi, Albert E.; Kuhn, Karen; Lee, Randy; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

2008-08-01T23:59:59.000Z

412

Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA  

Science Conference Proceedings (OSTI)

Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams such as voluntary spill discharge, turbine intake guidance screens, and surface flow outletsare instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to merging and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.

Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.; Khan, Fenton; Mueller, Robert P.; Nagy, William T.; Richmond, Marshall C.; Weiland, Mark A.

2008-07-29T23:59:59.000Z

413

Sheldon Glashow, the Electroweak Theory, and the Grand Unified Theory  

Office of Scientific and Technical Information (OSTI)

Sheldon Glashow and the Electroweak Theory Sheldon Glashow and the Electroweak Theory Resources with Additional Information Sheldon Glashow Courtesy AIP Emilio Segrè Visual Archives, Segrè Collection [Sheldon] 'Glashow shared the 1979 Nobel Prize for physics with Steven Weinberg and Abdus Salam for unifying the theories of weak and electromagnetic forces. The new "electroweak" theory underlies all of particle physics and provides a framework for understanding how the early universe evolved and how the chemical elements were created. ... "Glashow's work has been instrumental in our understanding of how our universe came into being," says Lawrence R. Sulak, chairman of the Boston University physics department. "In the years since winning the prize, Glashow has helped develop the Grand Unified Theory of all particles and all forces. Its predictions led to the construction of massive underground detectors, the refinement of the unification models, the first observation of neutrinos from a supernova, and the recent discovery that neutrinos have mass. Glashow has fueled an ongoing search for rare events and exotic effects that may shed further light on the evolution of the early universe."1

414

Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report  

DOE Green Energy (OSTI)

A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse adjacent to the existing dam. The funding sources considered were the Department of Energy loan program, the United States Bureau of Reclamation PL-984 loan program and conventional revenue bonds, both taxable and tax-exempt. The optimal project alternative was determined to be the apron-mounted configuration. The final choice of funding would be dependent on the power purchaser. It was shown that, regardless of the configuraton or funding source selected, the project would be feasible. The cost of the apron-mounted configuration, which would consist of four turbine-generator units for a total installed capacity of 9.76 MW, was estimated as $13,250,000 with financing provided by either a PL-984 loan or tax-exempt bonds. The cost per installed kilowatt was therefore $1,350, and the cost per kilowatt-hour was 19.6 mills. The average annual energy was estimated to be 56.44 million kWh, the equivalent of approximately 87,000 barrels of oil per y. It is therefore recommended that the Montana Department of Natural Resources and Conservation proceed with the project and that discussions be initiated with potential power purchasers as soon as possible.

Willer, D.C.

1979-04-23T23:59:59.000Z

415

Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.  

Science Conference Proceedings (OSTI)

Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to redevelop fisheries and fisheries habitat in basin streams and lakes.

Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

2003-06-01T23:59:59.000Z

416

Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.  

SciTech Connect

''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

2004-06-01T23:59:59.000Z

417

Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004  

DOE Green Energy (OSTI)

The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than {approx}7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s/m), (3) make water velocities at an entrance high enough (> 3 m/s) to entrain the subject juvenile fishes, (4) adapt the shape and orientation of the surface entrance(s) to fit site-specific features, and (5) consider installing a forebay wall to increase fish availability to the surface flow bypass.

Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

2005-06-01T23:59:59.000Z

418

Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004  

Science Conference Proceedings (OSTI)

The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than {approx}7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile fishes, (4) adapt the shape and orientation of the surface entrance(s) to fit site-specific features, and (5) consider installing a forebay wall to increase fish availability to the surface flow bypass.

Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

2005-06-01T23:59:59.000Z

419

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008  

DOE Green Energy (OSTI)

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

2009-12-28T23:59:59.000Z

420

Simulation analysis of within-day flow fluctuation effects on trout below flaming Gorge Dam.  

DOE Green Energy (OSTI)

In addition to being renewable, hydropower has the advantage of allowing rapid load-following, in that the generation rate can easily be varied within a day to match the demand for power. However, the flow fluctuations that result from load-following can be controversial, in part because they may affect downstream fish populations. At Flaming Gorge Dam, located on the Green River in northeastern Utah, concern has been raised about whether flow fluctuations caused by the dam disrupt feeding at a tailwater trout fishery, as fish move in response to flow changes and as the flow changes alter the amount or timing of the invertebrate drift that trout feed on. Western Area Power Administration (Western), which controls power production on submonthly time scales, has made several operational changes to address concerns about flow fluctuation effects on fisheries. These changes include reducing the number of daily flow peaks from two to one and operating within a restricted range of flows. These changes significantly reduce the value of the power produced at Flaming Gorge Dam and put higher load-following pressure on other power plants. Consequently, Western has great interest in understanding what benefits these restrictions provide to the fishery and whether adjusting the restrictions could provide a better tradeoff between power and non-power concerns. Directly evaluating the effects of flow fluctuations on fish populations is unfortunately difficult. Effects are expected to be relatively small, so tightly controlled experiments with large sample sizes and long study durations would be needed to evaluate them. Such experiments would be extremely expensive and would be subject to the confounding effects of uncontrollable variations in factors such as runoff and weather. Computer simulation using individual-based models (IBMs) is an alternative study approach for ecological problems that are not amenable to analysis using field studies alone. An IBM simulates how a population responds to environmental changes by representing how the population's individuals interact with their environment and each other. IBMs represent key characteristics of both individual organisms (trout, in this case) and the environment, thus allowing controlled simulation experiments to analyze the effects of changes in the key variables. For the flow fluctuation problem at Flaming Gorge Dam, the key environmental variables are flow rates and invertebrate drift concentrations, and the most important processes involve how trout adapt to changes (over space and time) in growth potential and mortality risk. This report documents simulation analyses of flow fluctuation effects on trout populations. The analyses were conducted in a highly controlled fashion: an IBM was used to predict production (survival and growth) of trout populations under a variety of scenarios that differ only in the level or type of flow fluctuation.

Railsback, S. F.; Hayse, J. W.; LaGory, K. E.; Environmental Science Division; EPRI

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al.,  

Open Energy Info (EERE)

Morgan, Et Al., Morgan, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Exploration Activity Details Location Rio Grande Rift Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown Notes San Luis Basin (south-central CO) regional study. References Paul Morgan, Peter Barkmann, Charles Kluth, Matthew Sares (2010) Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Retrieved from "http://en.openei.org/w/index.php?title=Data_Acquisition-Manipulation_At_Rio_Grande_Rift_Region_(Morgan,_Et_Al.,_2010)&oldid=401472" Category: Exploration

422

Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998  

SciTech Connect

The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997.

NONE

1998-04-01T23:59:59.000Z

423

Impacts of Post-Dam Land-use/Land-Cover Changes on Modification of Extreme Precipitation in Contrasting Hydro-climate and Terrain Features  

Science Conference Proceedings (OSTI)

Understanding the impact of post-dam climate feedbacks, due to land-use/land-cover (LULC)variability, on modification of extreme precipitation (EP) remains a challenge for a 21st century approach to dam design and operation. In this study, we used ...

Abel T. Woldemichael; Faisal Hossain; Roger Pielke Sr.

424

Quantification of Libby Reservoir Levels Needed to Maintain or Enhance Reservoir Fisheries, 1990-1994 Investigations of Fish Entrainment Through Libby Dam.  

DOE Green Energy (OSTI)

We investigated fish entrainment through Libby Dam from December 1990 to June 1994. This study was one portion of the effort by the Montana Department of Fish, Wildlife and Parks to quantify Libby Dam operations necessary to maintain or enhance Libby Reservoir fisheries.

Skaar, Don

1996-01-01T23:59:59.000Z

425

Columbia River Salmonid Outmigration: McNary Dam Passage and Enhanced Smolt Quality, 1984 Second Year Completion Report.  

DOE Green Energy (OSTI)

The effects of the McNary Dam transportation system on emigrating fall and spring chinook smolts were evaluated using physiological indices of stress (e.g., plasma cortisol, hepatic glycogen, leucocrit, interrenal cell nuclear diameter) and performance tests (e.g., saltwater challenge, secondary stress challenge, disease resistance). Controlled experiments were conducted in a hatchery environment to characterize the fishes' physiological responses to stress, and disease resistance to allow a basis for judging the nature of the stress experienced by smolts at McNary Dam. 55 figs., 3 tabs.

Schreck, Carl B.

1984-07-01T23:59:59.000Z

426

Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1994 Annual Report.  

DOE Green Energy (OSTI)

In 1994, the National Marine Fisheries Service and the University of Washington completed the second year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through the dams and reservoirs of the Snake River. Actively migrating smolts were collected at selected locations above, at, and below Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Survival estimates were calculated using the Single-Release, Modified Single-Release, and Paired-Release Models.

Muir, William D.

1995-02-01T23:59:59.000Z

427

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

2006-03-01T23:59:59.000Z

428

White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

2005-08-01T23:59:59.000Z

429

Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse  

Science Conference Proceedings (OSTI)

Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

2011-11-22T23:59:59.000Z

430

Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia  

DOE Green Energy (OSTI)

The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

Pasha, MD Fayzul K [ORNL; Hadjerioua, Boualem [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

2012-01-01T23:59:59.000Z

431

SunShot Shoots for the Moon with First Grand Challenge Event | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event May 23, 2012 - 11:40am Addthis The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. Ramamoorthy Ramesh Former Director, SunShot Initiative & Solar Energy Technologies Program How can I participate? The SunShot Initiative Grand Challenge: Summit and Technology Forum , taking place June 13 -14 in Denver, will focus on the progress made and challenges ahead for driving down the cost of solar technologies.

432

The SO2 Allowance Trading System: The Ironic History of a Grand Policy Experiment  

E-Print Network (OSTI)

Two decades have passed Two decades have passed since the Clean Air Act Amendments of 1990 launched a grand experiment in market-based environmental policy: the SO2 cap-and-trade system. That system performed well but ...

Schmalensee, Richard

433

Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Grande Lodge Pool & Spa Low Temperature Geothermal Facility Grande Lodge Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility Facility Sierra Grande Lodge Sector Geothermal energy Type Pool and Spa Location Truth or Consequences, New Mexico Coordinates 33.1284047°, -107.2528069° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

434

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and 355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Summary The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water

435

A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand  

Open Energy Info (EERE)

Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Details Activities (4) Areas (1) Regions (0) Abstract: Erosion in the Grand Canyon of the Yellowstone River, Yellowstone Caldera (640 ka), Wyoming, has exposed a cross section of older hydrothermal alteration in the canyon walls. The altered outcrops of the post-collapse tuff of Sulphur Creek (480 ka) extend from the canyon rim to more than 300 m beneath it. The hydrothermal minerals are zoned, with an advanced argillic alteration consisting of an association of quartz (opal)

436

The systemic and ideological sources of grand strategic doctrine : American foreign policy in the twentieth century  

E-Print Network (OSTI)

What explains the puzzling variation in America's foreign policy posture? This study proposes and tests a theory of American grand strategy that places an emphasis on two key variables: the ideological content of American ...

Green, Brendan Rittenhouse

2011-01-01T23:59:59.000Z

437

Transport of a Power Plant Tracer Plume over Grand Canyon National Park  

Science Conference Proceedings (OSTI)

Meteorological and air-quality data, as well as surface tracer concentration values, were collected during 1990 to assess the impacts of Navajo Generating Station (NGS) emissions on Grand Canyon National Park (GCNP) air quality. These data have ...

Jun Chen; Robert Bornstein; Charles G. Lindsey

1999-08-01T23:59:59.000Z

438

Monitoring Fine Sediment; Grande Ronde and John Day Rivers, 1999 Annual Report.  

DOE Green Energy (OSTI)

This project was initiated to monitor surface fine sediment levels and overwinter intrusion of fine sediment in spring chinook salmon spawning habitat in the North Folk John Day and Grande Ronde Rivers, for five years.

Rhodes, Jonathan J.; Greene, M. Jonas; Purser, Michael D. (Columbia River Inter-Tribal Fish Commission, Portland, OR)

2000-01-01T23:59:59.000Z

439

SunShot Shoots for the Moon with First Grand Challenge Event...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with...

440

The great american navel : le grand roman amricain et le langage appropri.  

E-Print Network (OSTI)

??Ce mmoire a pour objectif d'analyser le phnomne du Grand Roman Amricain comme reprsentation de l'imaginaire national, en en faisant l'archologie. Je propose, partir (more)

Grenier, Daniel

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "grand coulee dam" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.