EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT  

Broader source: Energy.gov [DOE]

The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

2

Effects of hydropower operations on recreational use and nonuse values at Glen Canyon and Flaming Gorge Dams  

SciTech Connect (OSTI)

Increases in streamflows are generally positively related to the use values of angling and white-water boating, and constant flows tend to increase the use values more than fluctuating flows. In most instances, however, increases in streamflows beyond some threshold level cause the use values to decrease. Expenditures related to angling and white-water boating account for about $24 million of activity in the local economy around Glen Canyon Dam and $24.8 million in the local economy around flaming Gorge Dam. The range of operational scenarios being considered in the Western Area Power Administration`s Electric Power Marketing Environmental Impact Statement, when use rates are held constant, could change the combined use value of angling and white-water boating below Glen Canyon Dam, increasing it by as much as 50%, depending on prevailing hydrological conditions. Changes in the combined use value below Flaming Gorge Dam could range from a decrease of 9% to an increase of 26%. Nonuse values, such as existence and bequest values, could also make a significant contribution to the total value of each site included in this study; however, methodological and data limitations prevented estimating how each operational scenario could change nonuse values.

Carlson, J.L.

1995-03-01T23:59:59.000Z

3

Columbia River Gorge Vegetation Management Project Final Environmental Assessment DOE/EA-1162  

Broader source: Energy.gov (indexed) [DOE]

COLUMBIA COLUMBIA RIVER MANAGEMENT PR GORGE OJECT VEGETAT ON Final Environmental Assessment DO E/EA-l 162 BONNEVILLE row,. ..", ",,,,.,,0. W x ? -- -- ------ .- .-- b I . , (, I I I ( t ,1 ,0 , . ,' I , ,- , !" 1 , I I ,; ,, 1 1 I .1 . . COLUMBIA RIVER GORGE VEGETATION MANAGEMENT ENVIRONMENTAL ASSESSMENT (Hanford-Ostrander and North BonnevilI&Midway Transmission Line Rights-of-Way) Table of Contents Page . 2 3 pqose and Need Background hbfic evolvement Swq ' ' Decbions to Be Made PROPOSED A~ON AND ~~RNA~S Mtemative k No Action " Manual, Mechnical, and Biological Metbh - Ntemative W. Proposed Action- htegrated Vegetation Management ~) tih Herbicides Herbici& Meth& -. PhedActions Comparison of Mtematives ~ . . . . . . ti~D E~OW~ ~ E_O_~m .. CONSEQ~N~S Affmd Environment . Environment Consquen~ hti Use Soils Vegetation Water Resources WildlfeResources Air Quali@lGlobal Warning

4

The effects of overwinter flowson the spring condition of rainbow and brown trout size classes in the Green River downstream of Flaming Gorge Dam, Utah.  

SciTech Connect (OSTI)

Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. Until recently, and since the early 1990s, single daily peak releases or steady flows have been the operational pattern of the dam during the winter period. However, releases from Flaming Gorge Reservoir followed a double-peak pattern (two daily flow peaks) during the winters of 2006-2007 and 2008-2009. Because there is little recent long-term history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on trout body condition in the dam's tailwater are not known. A study plan was developed that identified research activities to evaluate potential effects from winter double-peaking operations (Hayse et al. 2009). Along with other tasks, the study plan identified the need to conduct a statistical analysis of historical trout condition and macroinvertebrate abundance to evaluate the potential effects of hydropower operations. The results from analyses based on the combined size classes of trout (85-630 mm) were presented in Magnusson et al. (2008). The results of this earlier analysis suggested possible relationships between trout condition and flow, but concern that some of the relationships resulted from size-based effects (e.g., apparent changes in condition may have been related to concomitant changes in size distribution, because small trout may have responded differently to flow than large trout) prompted additional analysis of within-size class relationships. This report presents the results of analyses of three different size classes of trout (small: 200-299 mm, medium: 300-399 mm, and large: {ge}400 mm body length). We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam, and to (2) evaluate the relative importance of the effects of flow (i.e., flow volumes and flow variability), trout abundance (catch per unit effort [CPUE]), and benthic macroinvertebrate abundance on trout condition for different size classes of trout.

Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.; Environmental Science Division

2010-06-25T23:59:59.000Z

5

Evaluation of laboratory test method for determining the potential alkali contribution from aggregate and the ASR safety of the Three-Gorges dam concrete  

SciTech Connect (OSTI)

The releasable alkali from granite, which was used in the Three-Gorges concrete dam project in China, and from gneiss and feldspar was estimated by extraction in distilled water and super-saturated Ca(OH){sub 2} solution. Results show that: i) the finer the particles and the higher the temperature, the greater and faster the release of alkali; ii) compared with extraction by distilled water, super-saturated Ca(OH){sub 2} solution had a stronger activation on feldspar than on granite and gneiss; iii) for the three rocks tested, thermal activation had the largest effect on gneiss and a lower and similar effect on granite and feldspar. For very fine particles, temperature had a similar effect on the release of alkali by all three rocks. Because the aggregate used in the Three-Gorges dam concrete is non-reactive and a low calcium fly ash was used in the concrete, ASR would not be an issue for the dam, despite the release of alkali from the aggregate into the concrete.

Lu Duyou [College of Materials Science and Engineering, Nanjing University of Technology, No. 5 Xin Mafan Road, Nanjing, Jiangsu, 210009 (China)]. E-mail: duyoulu@njut.edu.cn; Zhou, Xiaoling [College of Materials Science and Engineering, Nanjing University of Technology, No. 5 Xin Mafan Road, Nanjing, Jiangsu, 210009 (China); Xu Zhongzi [College of Materials Science and Engineering, Nanjing University of Technology, No. 5 Xin Mafan Road, Nanjing, Jiangsu, 210009 (China); Lan Xianghui [College of Materials Science and Engineering, Nanjing University of Technology, No. 5 Xin Mafan Road, Nanjing, Jiangsu, 210009 (China); Tang Mingshu [College of Materials Science and Engineering, Nanjing University of Technology, No. 5 Xin Mafan Road, Nanjing, Jiangsu, 210009 (China); Fournier, Benoit [ICON/CANMET, Natural Resources Canada, 405 Rocherster Street, Ottawa, ON, K1A 0G1 (Canada)

2006-06-15T23:59:59.000Z

6

Libby Dam Wildlife Habitat Enhancement, 1992 Final Report.  

SciTech Connect (OSTI)

This is the final report of a project that was initiated in September, 1984 to mitigate for the loss of big game winter and spring range by the Libby Dam hydroelectric facility.

Holifield, Jennifer; Komac, Ron (Kootenai National Forest, Fisher River Ranger District, Libby MT)

1993-03-01T23:59:59.000Z

7

EIS-0351: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Final Environmental Impact Statement 1: Final Environmental Impact Statement EIS-0351: Final Environmental Impact Statement Operation of Flaming Gorge Dam The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program). EIS-0351-FEIS-01-2006.pdf EIS-0351-FEIS-02-2006.pdf EIS-0351-FEIS-03-2006.pdf More Documents & Publications

8

Columbia Gorge Gap Winds: Their Climatological Influence and Synoptic Evolution  

Science Journals Connector (OSTI)

This paper quantifies the impact of the Columbia Gorge on the weather and climate within and downstream of this mesoscale gap and examines the influence of synoptic-scale flow on gorge weather. Easterly winds occur more frequently and are ...

Justin Sharp; Clifford F. Mass

2004-12-01T23:59:59.000Z

9

FINAL TECHNICAL REPORT AMERICAN RECOVERY AND REINVESTMENT ACT NORTH FORK SKOKOMISH POWERHOUSE AT CUSHMAN NO. 2 DAM  

SciTech Connect (OSTI)

The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

Fischer, Steve; Wilson, Matthew

2013-09-30T23:59:59.000Z

10

Be dammed.  

E-Print Network [OSTI]

??Be Dammed is a research?based project that explores concepts of flow and containment, particularly looking at the interrelations between the planning and construction of large… (more)

Caycedo, Carolina

2014-01-01T23:59:59.000Z

11

Western Pond Turtle Recovery Columbia Gorge  

E-Print Network [OSTI]

Western Pond Turtle Recovery in the Columbia Gorge Project ID 200102700 Submitted by: 4 March 2009 species of concern Western Pond Turtle Washington Status #12;Columbia Mainstem Goals · Maintain;Western Pond Turtle Recovery Current Efforts · Head Start · Population Reintroduction · Predator Control

12

Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report  

SciTech Connect (OSTI)

This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

2013-07-31T23:59:59.000Z

13

Survival and Passage of Yearling Chinook Salmon and Steelhead at The Dalles Dam, Spring 2011 - FINAL REPORT  

SciTech Connect (OSTI)

The study reported herein was conducted by the Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The PNNL and UW project managers were Drs. Thomas J. Carlson and John R. Skalski, respectively. The USACE technical lead was Mr. Brad Eppard. The study was designed to estimate dam passage survival and other performance measures at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System Biological Opinion (BiOp) and the 2008 Columbia Basin Fish Accords. The study is being documented in two types of reports: compliance and technical. A compliance report is delivered within 6 months of the completion of the field season and focuses on results of the performance metrics outlined in the 2008 BiOp and Fish Accords. A technical report is produced within the 18 months after field work, providing comprehensive documentation of a given study and results on route-specific survival estimates and fish passage distributions, which are not included in compliance reports. This technical report concerns the 2011 acoustic telemetry study at The Dalles Dam.

Johnson, Gary E.; Hennen, Matthew J.; Zimmerman, Shon A.; Batten, G.; Carpenter, Scott M.; Deng, Zhiqun; Fu, Tao; Hughes, James S.; Martinez, Jayson J.; Ploskey, Gene R.; Royer, Ida M.; Townsend, Richard L.; Woodley, Christa M.; Kim, Jeongkwon; Etherington, D. J.; Skalski, J. R.; Carlson, Thomas J.; Cushing, Aaron W.; Fisher, Erik J.; Greiner, Michael J.; Khan, Fenton; Mitchell, T. D.; Rayamajhi, Bishes; Seaburg, Adam; Weiland, Mark A.

2012-10-01T23:59:59.000Z

14

Effect of the Operation of Kerr and Hungry Horse Dams on the Reproductive Success of Kokanee in the Flathead System; Technical Addendum to the Final Report.  

SciTech Connect (OSTI)

This addendum to the Final Report presents results of research on the zooplankton and fish communities of Flathead Lade. The intent of the Study has been to identify the impacts of hydroelectric operations at Kerr and Hungry Horse Dam on the reproductive success of kokanee an to propose mitigation for these impacts. Recent changes in the trophic ecology of the lake, have reduced the survival of kokanee. In the last three year the Study has been redirected to identify, if possible, the biological mechanisms which now limit kokanee survival, and to test methods of enhancing the kokanee fishery by artificial supplementation. These studies were necessary to the formulation of mitigation plans. The possibility of successfully rehabilitating the kokanee population, is the doubt because of change in the trophic ecology of the system. This report first presents the results of studies of the population dynamics of crustacean zooplankton, upon which planktivorous fish depend. A modest effort was directed to measuring the spawning escapement of kokanee in 1988. Because of its relevance to the study, we also report assessments of 1989 kokanee spawning escapement. Hydroacoustic assessment of the abundance of all fish species in Flathead Lake was conducted in November, 1988. Summary of the continued efforts to document the growth rates and food habits of kokanee and lake whitefish are included in this report. Revised kokanee spawning and harvest estimates, and management implications of the altered ecology of Flathead Lake comprise the final sections of this addendum. 83 refs., 20 figs., 25 tabs.

Beattie, Will; Tohtz, Joel

1990-03-01T23:59:59.000Z

15

A Review of the Oldowan Culture from Olduvai Gorge, Tanzania  

Science Journals Connector (OSTI)

... primitive stone industry in Bed I at Olduvai Gorge was first recorded in Nature on December 26, 1931. The name Oldowan was later given to this culture, which had been ...

M. D. LEAKEY

1966-04-30T23:59:59.000Z

16

Spatiotemporal characteristics of the Huangtupo landslide in the Three Gorges region (China) constrained by radar interferometry  

Science Journals Connector (OSTI)

......Landslide Disaster Mitigation in Three Gorges Reservoir...reservoir monitoring. Energy Procedia (2011) 4...In: Comprehensive Renewable Energy-Sayigh A., ed...in Landslide Disaster Mitigation in Three Gorges Reservoir......

R. Tomás; Z. Li; P. Liu; A. Singleton; T. Hoey; X. Cheng

2014-01-01T23:59:59.000Z

17

Engineering Geologic Assessment of Risk to Visitors: Canyon Lake Gorge, Texas  

E-Print Network [OSTI]

Presented here are the results of a study of geological hazards conducted in Canyon Lake Gorge of Central Texas. Canyon Lake Gorge formed in 2002 when the emergency spillway of Canyon Lake was overtopped. Since that time, the gorge has been opened...

Kolkmeier, Benjamin D.

2010-07-14T23:59:59.000Z

18

Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.  

SciTech Connect (OSTI)

This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to hydroelectric dam operations beyond those evaluated in this study likely would be necessary. M

Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

2007-11-13T23:59:59.000Z

19

E-Print Network 3.0 - anapodaris gorge south Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PLAN The Cornell campus includes a diversity of urban, suburban, Summary: Tompkins County countryside Cascadilla Gorge 12;41 Cornell's extended campus in Tompkins County is...

20

Dam Safety Program (Florida)  

Broader source: Energy.gov [DOE]

Dam safety in Florida is a shared responsibility among the Florida Department of Environmental Protection (FDEP), the regional water management districts, the United States Army Corps of Engineers ...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Experimental Implement Manufacture and Use; A Case Study from Olduvai Gorge, Tanzania  

Science Journals Connector (OSTI)

...Implement Manufacture and Use; A Case Study from Olduvai Gorge, Tanzania P. R. Jones Experiments involving the manufacture and use...models came from two sites in upper bed IV at Olduvai Gorge, Tanzania. The following conclusions are drawn. Widespread use of terms...

1981-01-01T23:59:59.000Z

22

Dam Safety (North Carolina)  

Broader source: Energy.gov [DOE]

North Carolina Administrative Code Title 15A, Subchapter 2K lays out further regulations for the design, approval, construction, maintenance, and inspection of dams to ensure public safety and...

23

White Sturgeon Management Plan in the Snake River between Lower Granite and Hells Canyon Dams; Nez Perce Tribe, 1997-2005 Final Report.  

SciTech Connect (OSTI)

White sturgeon in the Hells Canyon reach (HCR) of the Snake River are of cultural importance to the Nez Perce Tribe. However, subsistence and ceremonial fishing opportunities have been severely limited as a result of low numbers of white sturgeon in the HCR. Hydrosystem development in the Columbia River Basin has depressed numbers and productivity of white sturgeon in the HCR by isolating fish in impounded reaches of the basin, restricting access to optimal rearing habitats, reducing the anadromous forage base, and modifying early life-history habitats. Consequently, a proactive management plan is needed to mitigate for the loss of white sturgeon production in the HCR, and to identify and implement feasible measures that will restore and rebuild the white sturgeon population to a level that sustains viability and can support an annual harvest. This comprehensive and adaptive management plan describes the goals, objectives, strategies, actions, and expected evaluative timeframes for restoring the white sturgeon population in the HCR. The goal of this plan, which is to maintain a viable, persistent population that can support a sustainable fishery, is supported by the following objectives: (1) a natural, stable age structure comprising both juveniles and a broad spectrum of spawning age-classes; (2) stable or increasing numbers of both juveniles and adults; (3) consistent levels of average recruitment to ensure future contribution to reproductive potential; (4) stable genetic diversity comparable to current levels; (5) a minimum level of abundance of 2,500 adults to minimize extinction risk; and (6) provision of an annual sustainable harvest of 5 kg/ha. To achieve management objectives, potential mitigative actions were developed by a Biological Risk Assessment Team (BRAT). Identified strategies and actions included enhancing growth and survival rates by restoring anadromous fish runs and increasing passage opportunities for white sturgeon, reducing mortality rates of early life stages by modifying flows in the HCR, reducing mortality imposed by the catch and release fishery, augmenting natural production through translocation or hatchery releases, and assessing detrimental effects of contaminants on reproductive potential. These proposed actions were evaluated by assessing their relative potential to affect population growth rate and by determining the feasibility of their execution, including a realistic timeframe (short-term, mid-term, long-term) for their implementation and evaluation. A multi-pronged approach for management was decided upon whereby various actions will be implemented and evaluated under different timeframes. Priority management actions include: Action I- Produce juvenile white sturgeon in a hatchery and release into the management area; Action G- Collect juvenile white sturgeon from other populations in the Snake or Columbia rivers and release them into the management area; and Action D- Restore white sturgeon passage upriver and downriver at Lower Snake and Idaho Power dams. An integral part of this approach is the continual monitoring of performance measures to assess the progressive response of the population to implemented actions, to evaluate the actions efficacy toward achieving objectives, and to refine and redirect strategies if warranted.

Nez Perce Tribe Resources Management Staff, (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2005-09-01T23:59:59.000Z

24

Grand River Dam Authority | Open Energy Information  

Open Energy Info (EERE)

Dam Authority Dam Authority Jump to: navigation, search Name Grand River Dam Authority Place Oklahoma Utility Id 7490 Utility Location Yes Ownership S NERC Location SPP NERC SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png general service Commercial general service commercial Commercial large general servic time of use distributional Commercial

25

Status and Habitat Requirements of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam Volume II; Supplemental Papers and Data Documentation, 1986-1992 Final Report.  

SciTech Connect (OSTI)

This is the final report for research on white sturgeon Acipenser transmontanus from 1986--92 and conducted by the National Marine Fisheries Service (NMFS), Oregon Department of Fish and Wildlife (ODFW), US Fish and Wildlife Service (USFWS), and Washington Department of Fisheries (WDF). Findings are presented as a series of papers, each detailing objectives, methods, results, and conclusions for a portion of this research. This volume includes supplemental papers which provide background information needed to support results of the primary investigations addressed in Volume 1. This study addresses measure 903(e)(1) of the Northwest Power Planning Council's 1987 Fish and Wildlife Program that calls for ''research to determine the impact of development and operation of the hydropower system on sturgeon in the Columbia River Basin.'' Study objectives correspond to those of the ''White Sturgeon Research Program Implementation Plan'' developed by BPA and approved by the Northwest Power Planning Council in 1985. Work was conducted on the Columbia River from McNary Dam to the estuary.

Beamesderfer, Raymond C.; Nigro, Anthony A. [Oregon Dept. of Fish and Wildlife, Clackamas, OR (US)

1995-01-01T23:59:59.000Z

26

Transport of Atmospheric Aerosol by Gap Winds in the Columbia River Gorge  

Science Journals Connector (OSTI)

Typical diurnal wind patterns and their relationship to transport of atmospheric aerosol in the Columbia River gorge of Oregon and Washington are addressed in this paper. The measurement program included measurements of light scattering by ...

Mark C. Green; Jin Xu; Narendra Adhikari

2008-01-01T23:59:59.000Z

27

Flood Protection and Dam Safety (Virginia)  

Broader source: Energy.gov [DOE]

All dams in Virginia are subject to the Dam Safety Act and Dam Safety Regulations unless specifically excluded. A dam is excluded if it: (a) is less than six feet high; (b) has a maximum capacity...

28

FINAL  

Broader source: Energy.gov (indexed) [DOE]

2 2 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for Exide Technologies Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Bristol, TN, and Columbus, GA

29

Seven days: 6–12 July 2012  

Science Journals Connector (OSTI)

... Gorges Dam reaches full power China’s Three Gorges Dam — the world’s largest hydroelectric-power project — is now running at full capacity (22.5 gigawatts) after its ... is now running at full capacity (22.5 gigawatts) after its 32nd and final turbine was connected to the electricity grid on 4 July. Construction of the 2.3- ...

2012-07-11T23:59:59.000Z

30

Final  

Broader source: Energy.gov (indexed) [DOE]

, , Final for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards . Environmental Assessment Prepared for Southwestern Power Administration U.S. Department of Energy - _ . . . " Prepared by Black & Veatch October 13,1995 ' Table of Contents 1 . 0 Purpose and Need for Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 Description of the Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Alternative 1 . No Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Alternative 2 . Mechanical and Manual Control . . . . . . . . . . . . . . . . . . . 2.3 Alternative 3 . Proposed Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Foliar Spray Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Soil-Spot Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

31

Regulations and Permits Related to Dams (Vermont)  

Broader source: Energy.gov [DOE]

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

32

Dams, Dikes, and Other Devices; Dam Safety Program (North Dakota) |  

Broader source: Energy.gov (indexed) [DOE]

Dikes, and Other Devices; Dam Safety Program (North Dakota) Dikes, and Other Devices; Dam Safety Program (North Dakota) Dams, Dikes, and Other Devices; Dam Safety Program (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State North Dakota Program Type Siting and Permitting These regulations govern the permitting, construction, operation, inspection, and hazard classifications of dams, dikes, and other water

33

Safety of Dams and Reservoirs Act (Nebraska)  

Broader source: Energy.gov [DOE]

This act regulates dams and associated reservoirs to protect health and public safety and minimize adverse consequences associated with potential dam failure. The act describes the responsibilities...

34

Underwater noise generated by Columbia River hydroelectric dams  

Science Journals Connector (OSTI)

Low?frequency (10–1000 Hz) underwater noise measurements have been made in water within and upstream from four Columbia River hydroelectric dams. The motivation for these measurements was to map out the sound field within and upstream from the power dams as a first step in understanding the effect of this field on the behavior of migrating salmonids that must choose between the bypass system or intakes to the turbines. Eventually sound may be used to guide the juvenile fish safely past the turbine intakes and into the bypass system. Thus far single hydrophonemeasurements have been made in the bypass slots within the dam and at a number of locations upstream from the dam. The noise level varies with location decreasing as the hydrophone is moved upsteam from the dam and as the hydrophone is moved closer to the water surface immediately upstream of the dam as well as in the bypass slot. The noise spectra below 200 Hz are highly modulated displaying one or more sharp peaks which indicates resonances in the structural generating mechanism or propagation path. The spectrum level and modulation vary significantly from one dam to another and sometimes from one configuration to another (e.g. when one of the turbines is on or off). A final set of measurements will be made at the Bonneville Dam using several hydrophones placed at a number of locations in the vicinity of the intake channel and these may help identify sources and propagation paths to the hydrophone. [Work sponsored by U. S. Army Corps of Engineers.

Robert T. Miyamoto; Steven O. McConnell; James J. Anderson; Blake E. Feist

1989-01-01T23:59:59.000Z

35

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network [OSTI]

Retirement of Dams and Hydroelectric Facilities. ASCE, Newon the Allier River, a hydroelectric plant in France. Thethe dam generating hydroelectric power versus the ecological

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

36

Dam Safety Regulation (Mississippi) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Dam Safety Regulation (Mississippi) Dam Safety Regulation (Mississippi) Dam Safety Regulation (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Transportation Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Mississippi Program Type Environmental Regulations Siting and Permitting Provider Mississippi Department of Environmental Quality The purpose of the Dam Safety Regulation is to ensure that all dams constructed in the state of Mississippi are permitted and thus do not potentially harm wildlife, water supplies and property. Any person or entity proposing to construct, enlarge, repair, or alter a dam or reservoir

37

Non-Powered Dams Resource Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Non-Powered Dams Resource Assessment Non-Powered Dams Resource Assessment 652011waterpowerpeerreviewnpdornloctober2011.pptx More Documents & Publications An...

38

Ethanol Consumption by Rat Dams During Gestation,  

E-Print Network [OSTI]

Ethanol Consumption by Rat Dams During Gestation, Lactation and Weaning Increases Ethanol examined effects of ethanol consumption in rat dams during gestation, lactation, and weaning on voluntary ethanol consumption by their adolescent young. We found that exposure to an ethanol-ingesting dam

Galef Jr., Bennett G.

39

Salmon study sparks row over dams  

Science Journals Connector (OSTI)

... see some of the dams removed against federal agencies charged with maintaining the dams, providing power and protecting salmon. Thirty-one federal dams on the Columbia River and its tributaries ... River and its tributaries collectively provide some 60% of the region's electricity. The Bonneville ...

Jeff Tollefson

2008-10-27T23:59:59.000Z

40

Dam Safety (Delaware) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Dam Safety (Delaware) Dam Safety (Delaware) Dam Safety (Delaware) < Back Eligibility Construction Fed. Government Investor-Owned Utility Local Government Municipal/Public Utility State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info Start Date 2004 State Delaware Program Type Safety and Operational Guidelines Provider Delaware Department of Natural Resources and Environmental Control The Delaware Dam Safety Law was adopted in 2004 and provides the framework for proper design, construction, operation, maintenance, and inspection of dams in the interest of public health, safety, and welfare. The law requires licensing, inspections and preparation of emergency action plans (EAPs) for publicly owned dams with a high or significant hazard potential.

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Power Plant Dams (Kansas) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Power Plant Dams (Kansas) Power Plant Dams (Kansas) Power Plant Dams (Kansas) < Back Eligibility Commercial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Water Buying & Making Electricity Program Info State Kansas Program Type Environmental Regulations Provider Health and Environment This act states the provisions for erection and maintenance of dams. When any person, corporation or city may be desirous of erecting and maintaining a milldam or dam for generating power across any watercourse, the party so desiring to do the same may run the stream over the land of any other person by ditching or otherwise, and he, she or it may obtain the right to erect and maintain said dam and keep up and maintain the necessary ditches

42

Green River Locks and Dams 3, 4, 5, 6 and Barren River Lock and Dam 1 Disposition, Kentucky  

E-Print Network [OSTI]

Green River Locks and Dams 3, 4, 5, 6 and Barren River Lock and Dam 1 Disposition, Kentucky 16 September 2014 ABSTRACT: Green River Locks and Dams 3 through 6 and Barren River Lock and Dam 1 were. The Green River Locks and Dams 5 and 6 ceased operations in 1951 due to a marked decline in navigation

US Army Corps of Engineers

43

Dam Safety Regulations (Connecticut) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Safety Regulations (Connecticut) Safety Regulations (Connecticut) Dam Safety Regulations (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection All dams, except those owned by the U.S., are under the jurisdiction of these regulations. These dams will be classified by hazard rating, and may

44

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network [OSTI]

supply, flood control, hydropower, and recreation. However,as changes induced by hydropower, flood control, or waterFERC requires private hydropower dams to provide “equal

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

45

Providing protection: Agencies receive funding to repair, upgrade dams  

E-Print Network [OSTI]

Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

Wythe, Kathy

2009-01-01T23:59:59.000Z

46

Milner Dam Wind Park | Open Energy Information  

Open Energy Info (EERE)

Milner Dam Wind Park Milner Dam Wind Park Jump to: navigation, search Name Milner Dam Wind Park Facility Milner Dam Wind Park Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exergy Developer Exergy Energy Purchaser Idaho Power Location Cassia County ID Coordinates 42.495962°, -114.021106° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.495962,"lon":-114.021106,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

47

Dams (South Dakota) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Dams (South Dakota) Dams (South Dakota) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State South Dakota Program Type Siting and Permitting Provider South Dakota Department of Environment and Natural Resources Dam construction in South Dakota requires a Location Notice or a Water Right Permit. A Location Notice is a form that must be filed with the County Register of Deeds, and is the only paperwork required if (a) the proposed dam will impound 25 acre feet of water or less at the primary

48

Dams and Energy Sectors Interdependency Study  

Broader source: Energy.gov (indexed) [DOE]

[Type text] [Type text] Dams and Energy Sectors Interdependency Study September 2011 September 2011 Page 2 Abstract The U.S. Department of Energy (DOE) and the U.S. Department of Homeland Security (DHS) collaborated to examine the interdependencies between two critical infrastructure sectors - Dams and Energy. 1 The study highlights the importance of hydroelectric power generation, with a particular emphasis on the variability of weather patterns and competing demands for water which determine the water available for hydropower production. In recent years, various regions of the Nation suffered drought, impacting stakeholders in both the Dams and Energy Sectors. Droughts have the potential to affect the operation of dams and reduce hydropower production,

49

Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005  

SciTech Connect (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

2006-12-04T23:59:59.000Z

50

Evidence of a Quaternary dammed Lake in the Mawat–Chwarta area, Western Zagros, Kurdistan Region, NE-Iraq  

Science Journals Connector (OSTI)

Abstract The Mawat–Chwarta valley is located north of the Sulaimania City at Northern Iraq and is surrounded by high mountains on all sides. White laminated sediments with annual varves on a millimetre scale have been recorded at eight localities on the valley gentle slopes. Sedimentological, palaeontological and geomorphological data of these sediments suggest that a lake occupied the valley during the Quaternary. The sediments are of two types, purely fine-grained and fine-grained with coarse interbeds, the two types occur at an elevation difference of about 62 m. The two types are interpreted as representing deep (abyssal) and shoreline deposits, respectively, and indicate the approximate depth of the lake. The sediments contain the fresh water green algae of the genus Botryococcus in addition to a few leaves, scattered plant debris and some pollen grains mainly of herbaceous plants. Contrary to the general south-western drainage pattern in Northern Iraq the Mawat–Chwarta valley is drained to the north, where the Mawat River passes now through deep and narrow gorges along which rock slides and debris plugs are known to have occurred in the past. These mass wasting events are considered here to have blogged the runoff of the valley in the past and eventually led to the formation of a large dammed lake. Numerical chronology work failed, which requires further investigation in the future.

Polla Khanaqa; Kamal Haji Karim; Walter Riegel

2015-01-01T23:59:59.000Z

51

MFR PAPER 1222 Effects of Dams on Pacific Salmon  

E-Print Network [OSTI]

. Their numbers were few and their total effect was relatively minor. In the 1880's dams for hydroelectric power. In the 1930's major hydroelectric dams were built on the mainstem Columbia River (Fig. I), initiating

52

Hydropower Generators Will Deliver New Energy from an Old Dam  

Office of Energy Efficiency and Renewable Energy (EERE)

City of Tacoma expands hydroelectric dam to produce more than 23,000 megawatt hours of electricity annually.

53

Design of a Sediment Mitigation System for Conowingo Dam  

E-Print Network [OSTI]

Design of a Sediment Mitigation System for Conowingo Dam Rayhan Ain, Kevin Cazenas, Sheri Gravette as enhanced erosion of sediment due to significantly increased flow rates and constant interaction of water with the Dam. During these events, the sediment build up at Conowingo Dam in the Lower Susquehanna River has

54

Flood of protest hits Indian dams  

Science Journals Connector (OSTI)

... up once more in the Indian state of Sikkim, where the 520-mega­watt Teesta IV hydroelectric project would block a tributary of the Brahmaputra (see ‘A deluge of dams’) ... a panacea for both problems, and it plans to add another 110,000 megawatts of hydroelectric capacity by 2025, an eightfold increase. ...

Jane Qiu

2012-12-05T23:59:59.000Z

55

Chapter 13 Water Resources Hoover Dam  

E-Print Network [OSTI]

Chapter 13 Water Resources #12;Hoover Dam #12;The Colorado River Basin Population growth and removed by evaporation. Decrease or loss of vegetation due to climate change, wildfire, or land use affect the stream-channel form and processes. Vegetation Factors #12;Wildfire increases soil erosion

Pan, Feifei

56

Eco-Design of River Fishways for Upstream Passage: Application for Hanfeng Dam, Pengxi River, China  

SciTech Connect (OSTI)

This paper provides a scientific approach to eco-design of river fishways to allow upstream movement of fish past new and existing dams in China. This eco-design approach integrates principles of fish ecology/behavior and engineering, a scientific field also known as bio-engineering or eco-hydraulics. We define a fishway as a structure or mechanism to convey fish upstream past a dam. Man-made or natural stream beds can be part of the fishway mechanism. Fish include bony and non-bony fishes, and upstream passage is the concern here, not downstream passage. The problem is dams block access to upstream habitat used for spawning, rearing, and refuge, i.e., dams decrease habitat connectivity. A solution to alleviate this problem is to design fishways, preferably while the dam is being designed, but if necessary, as retrofits afterward to provide a route that fish can and will use to pass safely upstream without undue delay. Our eco-design approach for fishways involves eight steps: 1) identify the primary species of importance; 2) understand basic ecology and behavior of these fish; 3) characterize the environmental conditions where passage is or will be blocked; 4 identify fishway alternatives and select a preferred alternative; 5) establish eco-design criteria for the fishway, either from management agencies or, if necessary, developed specifically for the given site; 6) where needed, identify and perform research required to resolve critical uncertainties and finalize the eco-design criteria; 7) apply the eco-design criteria and site-specific considerations to design the fishway, involving peer-review by local stakeholders in the process; 8) build the fishway, monitor its effectiveness, and apply the lessons learned. Example fishways are described showing a range of eco-designs depending on the dam site and fish species of concern. We apply the eco-design principles to recommend an approach and next steps for a fishway to pass fish upstream at Hanfeng Dam, an existing regulating dam forming Hanfeng Lake on the Pengxi River near Kaixian, China.

Johnson, Gary E.; Rainey, William S.

2012-05-20T23:59:59.000Z

57

Integrative seismic safety evaluation of a high concrete arch dam  

Science Journals Connector (OSTI)

Abstract An integrative seismic safety evaluation of an arch dam should include all sources of nonlinearities, dynamic interactions between different components and the external loads. The present paper investigates the calibration procedure and nonlinear seismic response of an existing high arch dam. The first part explains the conducted analyses for the static and thermal calibrations of the dam based on site measurements. The second part investigates the nonlinear seismic analysis of the calibrated model considering the effect of joints, cracking of mass concrete, reservoir–dam–rock interaction, hydrodynamic pressure inside the opened joints and the geometric nonlinearity. Penetration of the water inside the opened joints accelerates the damage process. The integrative seismic assessment of a case study shows that the dam will fail under the maximum credible earthquake scenario. The dam is judged to be severely damaged with extensive cracking and the joints undergo opening/sliding. A systematic procedure is proposed for seismic and post-seismic safety of dams.

M.A. Hariri-Ardebili; M.R. Kianoush

2014-01-01T23:59:59.000Z

58

Sustainable Energy Dam: research into possible improvement of dam/dike safety by application of sustainable energy on dams/dikes:.  

E-Print Network [OSTI]

??A study on the use of the Afsluitdijk (or more generic, enclosure dams in general) for the generation of energy. Focus in this study in… (more)

Wondergem, D.

2008-01-01T23:59:59.000Z

59

Bull Trout Population Assessment in the Columbia River Gorge : Annual Report 2000.  

SciTech Connect (OSTI)

We summarized existing knowledge regarding the known distribution of bull trout (Salvelinus confluentus) across four sub-basins in the Columbia River Gorge in Washington. The Wind River, Little White Salmon River, White Salmon River, and the Klickitat River sub-basins were analyzed. Cold water is essential to the survival, spawning, and rearing of bull trout. We analyzed existing temperature data, installed Onset temperature loggers in the areas of the four sub-basins where data was not available, and determined that mean daily water temperatures were <15 C and appropriate for spawning and rearing of bull trout. We snorkel surveyed more than 74 km (46.25 mi.) of rivers and streams in the four sub-basins (13.8 km at night and 60.2 km during the day) and found that night snorkeling was superior to day snorkeling for locating bull trout. Surveys incorporated the Draft Interim Protocol for Determining Bull Trout Presence (Peterson et al. In Press). However, due to access and safety issues, we were unable to randomly select sample sites nor use block nets as recommended. Additionally, we also implemented the Bull Trout/Dolly Varden sampling methodology described in Bonar et al. (1997). No bull trout were found in the Wind River, Little White Salmon, or White Salmon River sub-basins. We found bull trout in the West Fork Klickitat drainage of the Klickitat River Sub-basin. Bull trout averaged 6.7 fish/100m{sup 2} in Trappers Creek, 2.6 fish/100m{sup 2} on Clearwater Creek, and 0.4 fish/100m{sup 2} in Little Muddy Creek. Bull trout was the only species of salmonid encountered in Trappers Creek and dominated in Clearwater Creek. Little Muddy Creek was the only creek where bull trout and introduced brook trout occurred together. We found bull trout only at night and typically in low flow regimes. A single fish, believed to be a bull trout x brook trout hybrid, was observed in the Little Muddy Creek. Additional surveys are needed in the West Fork Klickitat and mainstem Klickitat to determine the distribution of bull trout throughout the drainage and to determine the extent of hybridization with brook trout.

Byrne, Jim; McPeak, Ron

2001-02-01T23:59:59.000Z

60

Hoover Dam Bypass Project Phase II  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA-1478 DOE/EA-1478 ENVIRONMENTAL ASSESSMENT Western' s Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead #5 and #7 230-kV Transmission Lines with the Henderson-Mead #1 230-kV Transmission Line, Clark County, Nevada) Prepared for: U.S. Department of Energy Western Area Power Administration 615 S. 43 rd Avenue Phoenix, Arizona 85009 Prepared by: Transcon Environmental 3740 East Southern Avenue, Suite 218 Mesa, Arizona 85206 (480) 807-0095 October 2003 Western Area Power Administration Hoover Dam Bypass Project Phase II page i Environmental Assessment TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................................1 1.1 Background..................................................................................................................................1

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - ExSum-Sept05.doc  

Broader source: Energy.gov (indexed) [DOE]

Flaming Gorge Dam Final Environmental Impact Statement Executive Summary U.S. Department of the Interior Bureau of Reclamation Upper Colorado Region Salt Lake City, Utah September 2005 Note to the Reader This Executive Summary provides an overview of the proposed action analyzed in the Operation of Flaming Gorge Dam Final Environmental Impact Statement (EIS). It is intended to provide a concise report of the proposed action, alternatives, and environmental consequences which are explained and analyzed in detail in the EIS. Because a number of those on the EIS mailing list asked only for a copy

62

Delivery of the Canadian Entitlement Final Environmental Impact Statement January 1996  

Broader source: Energy.gov (indexed) [DOE]

Summary-1996.html[6/27/2011 12:01:22 PM] Summary-1996.html[6/27/2011 12:01:22 PM] Summary Delivery of the Canadian Entitlement Final Environmental Impact Statement (EIS) Purpose of and Need for Action The Columbia River Treaty (Treaty) between Canada and the United States of America (United States), signed in 1961, required three storage dams to be constructed on the Columbia River system in Canada (Duncan, Keenleyside, and Mica Dams), and allowed for one additional dam in the United States (Libby Dam). The dams help control floods in both countries, and the regulated stream flow provided by the three Treaty reservoirs in Canada enables dams downstream in the United States to produce additional power (the "downstream power benefits"). Under the Treaty, Canada and the United States share the downstream benefits equally.

63

Dams and Reservoirs Safety Act (South Carolina) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Dams and Reservoirs Safety Act (South Carolina) Dams and Reservoirs Safety Act (South Carolina) Dams and Reservoirs Safety Act (South Carolina) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Institutional Savings Category Water Buying & Making Electricity Program Info State South Carolina Program Type Siting and Permitting Provider South Carolina Department of Health and Environmental Control The Dams and Reservoirs Safety Act provides for the certification and inspection of dams in South Carolina and confers regulatory authority on the Department of Health and Environmental Control. Owners of dams and reservoirs are responsible for maintaining the safety of the structures,

64

Safe Dams Act of 1972 (Tennessee) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Safe Dams Act of 1972 (Tennessee) Safe Dams Act of 1972 (Tennessee) Safe Dams Act of 1972 (Tennessee) < Back Eligibility Agricultural Commercial Construction General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Transportation Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Tennessee Program Type Environmental Regulations Siting and Permitting Provider Tennessee Department Of Environment and Conservation The Safe Dams Act of 1973 (SDA) gives the Commissioner of the Department of Environment and Conservation the power to issue certificates authorizing the construction, alteration, or operation of a dam. A dam is defined as any artificial barrier, together with appurtenant works, which does or may impound or divert water, and which either (1) is or will be twenty (20)

65

Women @ Energy: Kerstin Kleese van Dam | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kerstin Kleese van Dam Kerstin Kleese van Dam Women @ Energy: Kerstin Kleese van Dam March 27, 2013 - 3:41pm Addthis Kerstin Kleese van Dam is an associate division director of the Computational Science and Mathematics Division and leads the Scientific Data Management Group at Pacific Northwest National Laboratory. Kerstin Kleese van Dam is an associate division director of the Computational Science and Mathematics Division and leads the Scientific Data Management Group at Pacific Northwest National Laboratory. Check out other profiles in the Women @ Energy series and share your favorites on Pinterest. Kerstin Kleese van Dam has led the charge at Pacific Northwest National Laboratory to resolve data management, analysis, and knowledge discovery challenges in extreme-scale data environments. She also directs data

66

Modeling the costs and benefits of dam construction from a multidisciplinary perspective  

E-Print Network [OSTI]

, energy, and environmental protection well into the future, a broader view of dams is needed. We thus and to articulate priorities associated with a dam project, making the decision process about dams more informed dams, the next generation may witness a renewed intensity in large dam development in the U.S. More

Tullos, Desiree

67

Georgia Safe Dams Act of 1978 (Georgia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Safe Dams Act of 1978 (Georgia) Safe Dams Act of 1978 (Georgia) Georgia Safe Dams Act of 1978 (Georgia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The purpose of the Georgia Safe Dams Act is to provide regulation,

68

Montana Dam Safety Act (Montana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Montana Dam Safety Act (Montana) Montana Dam Safety Act (Montana) Montana Dam Safety Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Retail Supplier Institutional Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1985 State Montana Program Type Siting and Permitting Provider Montana Department of Natural Resources and Conservation This Act establishes the state's interest in the construction of dams for water control and regulation and for hydropower generation purposes. It

69

Dam Design and Construction (Wisconsin) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Dam Design and Construction (Wisconsin) Dam Design and Construction (Wisconsin) Dam Design and Construction (Wisconsin) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1985 State Wisconsin Program Type Safety and Operational Guidelines Provider Department of Natural Resources These regulations apply to dams that are not owned by the U.S. government

70

Environmental Impacts of Increased Hydroelectric Development at Existing Dams  

Broader source: Energy.gov [DOE]

This report describes the environmental impacts of a proposed U.S. Department of Energy (DOE) initiative to promote the development of hydropower resources at existing dams.

71

Potential Geomorphic and Ecological Impacts of Marmot Dam Removal, Sandy River, OR  

E-Print Network [OSTI]

Marmot Dam is a 13-meter (42 ft) high hydroelectric diversion dam on the Sandy River that is owned Run Hydroelectric project and began the process of creating a decommissioning plan for the dam

72

The distribution of dams in Costa Rica and their hydrologic impacts  

E-Print Network [OSTI]

Dam construction has increased exponentially over the past century, primarily in temperate environments. While the impacts of dams in temperate regions have been well-documented, a parallel level of research on dam impacts has not been achieved...

Laurencio, Laura Richards

2006-04-12T23:59:59.000Z

73

EA-1478: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

78: Final Environmental Assessment 78: Final Environmental Assessment EA-1478: Final Environmental Assessment Hoover Dam Bypass Project Phase II The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Environmental Assessment Western's Hoover Dam Bypass Project Phase II, DOE/EA-1478 (October 2003) More Documents & Publications EA-1478: Finding of No Significant Impact EIS-0352: Record of Decision EIS-0490: DOE Record of Decision

74

A DETAILED RESEARCH PLAN TO ASSESS BEHAVIOR OF ADULT SUMMER/FALL CHINOOK UPSTREAM OF WELLS DAM USING  

E-Print Network [OSTI]

........................................................................ 11 3.6.3 Chief Joseph Dam Powerhouse

75

Using ArcGIS to extrapolate greenhouse gas emissions on the Pengxi River, a tributary of the Three Gorges Reservoir in China  

E-Print Network [OSTI]

Using ArcGIS to extrapolate greenhouse gas emissions on the Pengxi River, a tributary of the Three Gorges Reservoir in China Lindsey MW Yasarer, PhD Candidate, University of Kansas Dr. Zhe Li, Associate Professor, Chongqing University Dr.... Belinda Sturm, Associate Professor, University of Kansas RESERVOIR GREENHOUSE GAS EMISSIONS (Image from FURNAS www.dsr.inpe.br) HOW TO SCALE UP GHG EMISSIONS? PROJECT OBJECTIVE: Estimate overall greenhouse gas emissions from the Pengxi River Backwater...

Yasarer, Lindsey

2014-11-19T23:59:59.000Z

76

Processes affecting the spatial and temporal variability of methane in a temperate dammed river system  

E-Print Network [OSTI]

gas emissions from a hydroelectric reservoir (Brazil’sgas emissions from hydroelectric dams: controversies provideP. M. , 2005a. Do hydroelectric dams mitigate global

Bilsley, Nicole A.

2012-01-01T23:59:59.000Z

77

Dam Safety and Encroachments Act (Pennsylvania) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Dam Safety and Encroachments Act (Pennsylvania) Dam Safety and Encroachments Act (Pennsylvania) Dam Safety and Encroachments Act (Pennsylvania) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Savings Category Water Buying & Making Electricity Program Info State Pennsylvania Program Type Safety and Operational Guidelines Provider Pennsylvania Department of Environmental Protection This act sets the standards and criteria for the siting and design of dams, water obstructions and encroachments considering both existing and projected conditions. It requires operational plans to be prepared and implemented by owners and also requires monitoring, inspection and reporting of conditions affecting the safety of dams, water obstructions

78

Dams and Energy Sectors Interdependency Study, September 2011 | Department  

Broader source: Energy.gov (indexed) [DOE]

Dams and Energy Sectors Interdependency Study, September 2011 Dams and Energy Sectors Interdependency Study, September 2011 Dams and Energy Sectors Interdependency Study, September 2011 The U.S. Department of Energy (DOE) and the U.S. Department of Homeland Security (DHS) collaborated to examine the interdependencies between two critical infrastructure sectors - Dams and Energy. The study highlights the importance of hydroelectric power generation, with a particular emphasis on the variability of weather patterns and competing demands for water which determine the water available for hydropower production. Dams-Energy Interdependency Study.pdf More Documents & Publications Hydroelectric Webinar Presentation Slides and Text Version Impacts of Long-term Drought on Power Systems in the U.S. Southwest - July 2012 Before the Senate Energy and Natural Resources Committee

79

EA-1588: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

88: Final Environmental Assessment 88: Final Environmental Assessment EA-1588: Final Environmental Assessment Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation The U.S. Army Corps of Engineers proposes to construct a new vehicle bridge across the American River Downstream about 800 feet east and 1,100 feet west of Folsom Dam, which will be located in an existing right-of-way currently occupied by the Sacramento Municipal Utility District double-circuit Orangevale-Lake/Whiterock-Orangevale 230-kilovolt and 12-kilovolt transmission lines. Finding on No Significant Impact for the Sacramento Municipal Utility District 230-kV Folsom Dam Transmission Line Relocation, EA-1588 (January 2007) More Documents & Publications EA-1588: Finding of No Significant Impact

80

Dams, Mills, and Electric Power (Missouri) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mills, and Electric Power (Missouri) Mills, and Electric Power (Missouri) Dams, Mills, and Electric Power (Missouri) < Back Eligibility Commercial Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Missouri Program Type Siting and Permitting Provider Missouri Department of Natural Resources The Water Resources Center of the Missouri Department of Natural Resources is responsible for implementing regulations pertaining to dam and reservoir safety. Any person or corporation may erect a dam across any watercourse, provided that: (a) the entity is chartered to construct, operate and

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Regulation of Dams and Bridges Affecting Navigable Waters (Wisconsin) |  

Broader source: Energy.gov (indexed) [DOE]

Dams and Bridges Affecting Navigable Waters Dams and Bridges Affecting Navigable Waters (Wisconsin) Regulation of Dams and Bridges Affecting Navigable Waters (Wisconsin) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 2007 State Wisconsin Program Type Siting and Permitting Provider Department of Natural Resources Chapter 31 of the Wisconsin Statutes lays out the regulations relevant to

82

TSSGNEO suggestions for refinement of safety criteria for dam at the Sayano-Shushenskaya HPP  

SciTech Connect (OSTI)

Analysis of radial-displacements of the dam, measured by direct and inverted plumb lines, indicates that curves of the variation in radial displacements of the dam at different elevations make it possible to plot diagrams of increases in the radial displacement over the entire height of the dam, i.e., inclines of the axis of the dam to the vertical.

Savich, A. I.; Gaziev, E. G. [Expert Commission on Assessment of the 'Dam - Bed' System at the Sayano-Shushenskaya HPP (Russian Federation)] [Expert Commission on Assessment of the 'Dam - Bed' System at the Sayano-Shushenskaya HPP (Russian Federation)

2013-09-15T23:59:59.000Z

83

Peak discharge of a Pleistocene lava-dam outburst flood in Grand Canyon, Arizona, USA  

E-Print Network [OSTI]

produced the largest known flood on the Colorado River in Grand Canyon. The Hyaloclastite Dam was up to 366 Canyon; Colorado river; Pleistocene floods; Lava dams; Hydraulic modeling; Paleoflood indicators; DamPeak discharge of a Pleistocene lava-dam outburst flood in Grand Canyon, Arizona, USA Cassandra R

84

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011  

SciTech Connect (OSTI)

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-06-04T23:59:59.000Z

85

REVIEW PLAN John Redmond Dam Reservoir, Coffee County, Kansas  

E-Print Network [OSTI]

#12;#12;REVIEW PLAN John Redmond Dam Reservoir, Coffee County, Kansas Reallocation Study Tulsa...................................................................................................................11 12. REVIEW PLAN APPROVAL AND UPDATES........................................................................................11 13. REVIEW PLAN POINTS OF CONTACT

US Army Corps of Engineers

86

IMPACTS OF LANDSLIDE DAMS ON MOUNTAIN VALLEY MORPHOLOGY  

Science Journals Connector (OSTI)

Landslide dams can influence mountain-valley morphology significantly in the vicinity of the ... and their impoundments, and thus influence the long-term effects of these natural features on mountain-valley morph...

R.L. SCHUSTER

2006-01-01T23:59:59.000Z

87

A hydraulic model study of the gray reef dam spillway  

E-Print Network [OSTI]

A HYDRAULIC MODEL STUDY OF THE GRAY REEF DAM SPILLWAY A Thesis by ALI AKHTAR QURAISHI Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE January 1961 Major Subject: Civil Engineering A HYDRAULIC MODEL STUDY OF THE GRAY REEF DAM SPILLWAY A Thesis ALI AKHTAR QURAISHI Approved as to style and content by: Chairman of Comm' e Head of the Depa ment January 1961 ACKNOWLEDGMENT...

Quraishi, Ali Akhtar

2012-06-07T23:59:59.000Z

88

Division of Water, Part 673: Dam Safety Regulations (New York) | Department  

Broader source: Energy.gov (indexed) [DOE]

3: Dam Safety Regulations (New York) 3: Dam Safety Regulations (New York) Division of Water, Part 673: Dam Safety Regulations (New York) < Back Eligibility Fed. Government Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State New York Program Type Safety and Operational Guidelines Provider NY Department of Environmental Conservation These regulations address dam safety, define dam hazard categories and inspection procedures, and apply to any owner of a dam. Dam owners are required to maintain dams in a safe condition at all times and to comply with Department inquiries for information on the status of a given dam

89

Four Dam Pool Power Agency FDPPA | Open Energy Information  

Open Energy Info (EERE)

Dam Pool Power Agency FDPPA Dam Pool Power Agency FDPPA Jump to: navigation, search Name Four Dam Pool Power Agency (FDPPA) Place Anchorage, Alaska Zip 99515 Sector Hydro Product Joint action agency consisting of four hydroelectric projects that was organized by five electric cooperatives that purchase power from the facilities. Coordinates 38.264985°, -85.539014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.264985,"lon":-85.539014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

90

E-Print Network 3.0 - analysis model dam Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

water from Yongdam Dam. The advantages of a model such as the one... , irrigation, hydropower, and recreation. Two major dams are ... Source: Kim, Young-Oh - Department of Civil...

91

E-Print Network 3.0 - arch dams including Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

part of the East Branch Dam Safety Initiative in Elk County, Pa. The site development work went to Tab... seepage-related dam safety concerns at East Branch Clarion River Lake in...

92

Methane Emissions from Large Dams as Renewable Energy Resources: A Developing Nation Perspective  

Science Journals Connector (OSTI)

By means of a theoretical model, bootstrap resampling and data provided by the International Commission On Large Dams (ICOLD (2003) World register of dams. http://www.icold-cigb.org) we found that global large da...

Ivan B. T. Lima; Fernando M. Ramos…

2008-02-01T23:59:59.000Z

93

DOWNSTREAM BENTHIC RESPONSES TO SMALL DAM REMOVAL IN A COLDWATER STREAM  

E-Print Network [OSTI]

removals on downstream periphyton and macroinvertebrates in Boulder Creek, WI (USA). The dams were 180 m such as flood abatement, irrigation, recreation and hydropower. There are more than 75 000 dams over 1.8 m high

Stanley, Emily

94

Mills, Dams, and Reservoirs (Massachusetts) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Mills, Dams, and Reservoirs (Massachusetts) Mills, Dams, and Reservoirs (Massachusetts) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Massachusetts Program Type Siting and Permitting Provider Department of Conservation and Recreation This chapter of the Massachusetts General Laws outlines procedures to

95

The Sensor Fish - Making Dams More Salmon-Friendly  

SciTech Connect (OSTI)

This article describes the Sensor Fish, an instrument package that travels through hydroelectric dams collecting data on the hazardous conditions that migrating salmon smolt encounter. The Sensor Fish was developed by Pacific Northwest National Laboratory with funding from DOE and the US Army Corps of Engineers and has been used at several federal and utility-run hydroelectric projects on the Snake and Columbia Rivers of the US Pacific Northwest. The article describes the evolution of the Sensor Fish design and provides examples of its use at McNary and Ice Harbor dams.

Carlson, Thomas J.; Duncan, Joanne P.; Gilbride, Theresa L.; Keilman, Geogre

2004-07-31T23:59:59.000Z

96

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012  

SciTech Connect (OSTI)

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

97

Existing schemes for constructing high concrete dams and ways to improve them  

Science Journals Connector (OSTI)

1. Improvement of the existing cyclic methods of constructing concrete dams in recent years made it possible to ...

V. I. Teleshev; V. K. Loshak

1982-10-01T23:59:59.000Z

98

An Assessment of Energy Potential at Non-Powered Dams in the...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DAM CEMVR DES MOINES POLK IA DES MOINES 1975 94.2 2,021 119,400 24.3 84 B. EVERETT JORDAN DAM CESAW HAYWOOD CHATHAM NC HAW 1974 61.0 1,460 55,846 23.9 85 LOCK C-1 DAM AT...

99

Green River Lake and Dam interim plan benefits ecosystem By John Hickey  

E-Print Network [OSTI]

11 Green River Lake and Dam interim plan benefits ecosystem By John Hickey Hydrologic Engineering that water is released from Green River Dam in Kentucky. In May 2006, the interim plan was approved shown that operation of Green River Dam can be changed in ways that improve ecosystems while continuing

US Army Corps of Engineers

100

Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.  

SciTech Connect (OSTI)

This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

Wood, Marilyn

1984-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Flood Control Reservoirs Operable September 30, 2007 Characteristics of Dam  

E-Print Network [OSTI]

Creek Superior 960 34,500 NPP F Earth 25 978 ARKANSAS Blakely Mountain Ouachita Dam Ouachita Hot Springs-Ft.) Permanent Pool (Acreage) or No Pool (NPP) Project Functions Type Height (Feet) Length (Feet) ALASKA Chena River Lakes Chena Tanana Chena River Fairbanks 1979 2,000 NPP FRD Earth 50 40,200 ARIZONA Adobe Gila

US Army Corps of Engineers

102

Flood Control Reservoirs Operable September 30, 2008 Characteristics of Dam  

E-Print Network [OSTI]

Creek Superior 960 34,500 NPP F Earth 25 978 ARKANSAS Blakely Mountain Ouachita Dam Ouachita Hot Springs-Ft.) Permanent Pool (Acreage) or No Pool (NPP) Project Functions Type Height (Feet) Length (Feet) ALASKA Chena River Lakes Chena Tanana Chena River Fairbanks 1979 2,000 NPP FRD Earth 50 40,200 ARIZONA Adobe Gila

US Army Corps of Engineers

103

Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.  

SciTech Connect (OSTI)

In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.

Warf, Don; Livingston, Scott [Pacific States Marine Fisheries Commission

2009-04-16T23:59:59.000Z

104

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Broader source: Energy.gov (indexed) [DOE]

29, 2003 29, 2003 To: People Interested in the Project to Mitigate and Restore White Sturgeon Populations in the Columbia and Snake Rivers Bonneville Power Administration (BPA) has prepared the Final Environmental Assessment (EA), which includes a Finding of No Significant Impact (FONSI), for the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The document is enclosed for your information. Background: Since 1986, State, Federal, and Tribal fisheries agencies have been gathering data and studying habitats, movements, population dynamics, feeding, and distribution of white sturgeon in the Columbia River system. With the decline in anadromous salmonid runs there has been an increase in the importance of the white sturgeon fisheries. The Oregon Department of

105

2D THD and 3D TEHD analysis of large spindle supported thrust bearings with pins and double layer system used in the three gorges hydroelectric generators  

Science Journals Connector (OSTI)

A 2D THD model and a 3DTEHD model for large spindle supported thrust bearings were set up and used to analyze the lubrication performance of the Three Gorges test thrust beating withpins and double layer system developed by Alstom Power. The finite difference method was employed to solve the THD model, and the thermal-elasticdeformations in the pad and runner were obtained by the finite element software ANSYS11.0. The data transfer between the THD model and ANSYS11.0 was carried out automatically by an interface program.A detailed comparison between the experimental results and numerical predictions by the two different modelsset up in this paper was carried out. Poor agreement has been found between the theoretical results obtained by 2D THD model and experimental data, while 3D TEHD provides fairly good agreement, confirming the importance of thermal effects and thermal-elastic deformations in both pad and runner.

B Huang; Z D Wu; J L Wu; L Q Wang

2012-01-01T23:59:59.000Z

106

EA-1367: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1367: Final Environmental Assessment EA-1367: Final Environmental Assessment EA-1367: Final Environmental Assessment White Sturgeon Mitigation and Restoration in the Columbia & Snake River Upstream from Bonneville Dam Development of the hydropower system in the Columbia River Basin has had far-reaching effects on many species of fish and wildlife. The Bonneville Power Administration (BPA) is responsible for protecting, mitigating, and enhancing fish and wildlife affected by the development, operation, and management of Federal hydroelectric facilities on the Columbia River and its tributaries. One of the measures recommended to help mitigate for fish loss and reduced habitat is the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The

107

10 Questions for a Computational Scientist: Kerstin Kleese-Van Dam |  

Broader source: Energy.gov (indexed) [DOE]

a Computational Scientist: Kerstin Kleese-Van Dam a Computational Scientist: Kerstin Kleese-Van Dam 10 Questions for a Computational Scientist: Kerstin Kleese-Van Dam June 9, 2011 - 4:35pm Addthis Kerstin Kleese-Van Dam Kerstin Kleese-Van Dam Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs Science gave me the opportunity to contribute to addressing some of society's big challenges - climate change, environmental remediation, sustainable clean energy and secure power. Kerstin Kleese-Dam, Computational Scientist Meet Kerstin Kleese-Van Dam. At Pacific Northwest National Lab, she's a master of computers and data - covering a wide span of projects from genomic sciences and climate change to nanometer-scale imaging and power grids. She recently spent some time to give us the download on her many

108

Dam Construction and Maintenance (Minnesota) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction and Maintenance (Minnesota) Construction and Maintenance (Minnesota) Dam Construction and Maintenance (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Program Info State Minnesota Program Type Siting and Permitting Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may also choose to

109

Turbocharger with sliding piston, and having vanes and leakage dams  

DOE Patents [OSTI]

A turbocharger having a sliding piston for regulating exhaust gas flow into the turbine wheel includes a set of first vanes mounted on a fixed first wall of the turbine nozzle and projecting axially toward an opposite second wall of the nozzle, and/or a set of second vanes mounted on the end of the piston and projecting in an opposite axial direction toward the first wall of the nozzle. For the/each set of vanes, there are leakage dams formed on the wall that is adjacent the vane tips when the piston is closed. The leakage dams are closely adjacent the vane tips and discourage exhaust gas from leaking in a generally radial direction past the vane tips as the piston just begins to open from its fully closed position.

Roberts, Quentin (Nancy, FR); Alnega, Ahmed (Thaon Les Vosges, FR)

2011-12-06T23:59:59.000Z

110

Seismic safety of earth dams: A probabilistic approach  

SciTech Connect (OSTI)

The evaluation of the potential for slope sliding and/or liquefaction failure of earthen dams subjected to earthquake loadings is most often based on deterministic procedures of both the excitation input and of the physical model. Such treatment provides answers in the form of either factor of safety values or a yes or no as to whether liquefaction will occur or not. Uncertainties in the physical properties of the soil in the embankment and the foundation layers underlying the dam are typically treated with parametric studies. Consideration of probabilities pertaining to the uncertainties of the earthquake and of the site characterization is expected to augment the prediction of failure potential by associating slope and liquefaction failure to generic properties of the earthquake and of the site characterization. In this study, the procedures for conditional slope failure/liquefaction probabilities are formulated based on a series of simulated deterministic analyses of a dam cross section . These synthetic earthquakes emanate from a 1-D stationary stochastic process of zero mean and an analytical form of power spectral density function. The response of the dam section is formed upon a dynamic finite element approach which provides the temporal variations of the stresses, strains and pore water pressure throughout the model. The constitutive response of the granular soil skeleton and its coupling with the fluid phase is formulated based on the Biot dynamic equations of motion with nonlinear terms compensated for into soil hysteretic damping. Lastly, a stochastic approach to liquefaction based on the transferring of the input motion statistics to the cross section is presented.

Simos, N.; Costantino, C.J.; Reich, M.

1994-08-01T23:59:59.000Z

111

Flood Control Reservoirs Operable September 30, 2009 Characteristics of Dam  

E-Print Network [OSTI]

Pine 1953 2,768,500 20,900 FPRSW Earth 235 1,100 Blue Mountain Arkansas Petit Jean River Paris 1947 257 Marysville 1941 69,000 400 DR Concrete 280 1,142 Hidden Dam- Hensley Lake San Joaquin Fresno River Madera 1975 90,000 5,000 FIRW Earth 163 5,730 Isabella San Joaquin Kern River Bakersfield 1953 567,100 1

US Army Corps of Engineers

112

Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004  

SciTech Connect (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

2005-12-22T23:59:59.000Z

113

Hydroacoustic Assessment of Downstream Migrating Salmonids at Lower Monumental Dam in Spring, 1985 Final Report.  

SciTech Connect (OSTI)

The primary objective of this study was to estimate the effectiveness of the spillway in passing migrants, with the spillway operating per the criteria identified in the COE's 1985 Juvenile Fish Passage Plan. Specific study objectives were to estimate: (1) the effectiveness of the spillway for Passing migrants; (2) die1 variability in passage rates of migrants through the powerhouse and the spillway; (3) the daily and cumulative run timing of migrant passage; (4) the proportions of migrants that passed through each turbine intake and spill bay (i.e., the horizontal distributions across the powerhouse and the spillway); and (5) the vertical distributions of migrants approaching the powerhouse and spillway.

Johnson, Ward R. (BioSonics, Inc., Seattle, WA)

1985-12-01T23:59:59.000Z

114

Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.  

SciTech Connect (OSTI)

On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.

Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B; Decision and Information Sciences; Western Area Power Administration

2010-07-31T23:59:59.000Z

115

Final Reminder:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Reminder: Final Reminder: Final Reminder: Please save your $SCRATCH and $SCRATCH2 imporant files by 4/30/12 April 27, 2012 by Helen He (0 Comments) Franklin batch system is drained, and all batch queues are stopped as of 4/26 23:59pm. This is the final reminder that please make sure to save important files on your Franklin $SCRATCH and $SCRATCH2. ALL FILES THERE WILL BE DELETED, and there will be no mechanisms to recover any of the files after May 1. Mon Apr 30: Last day to retrieve files from Franklin scratch file systems Mon Apr 30, 23:59: User logins are disabled If you need help or have any concerns, please contact "consult at nersc dot gov". Post your comment You cannot post comments until you have logged in. Login Here. Comments No one has commented on this page yet.

116

Final Report  

SciTech Connect (OSTI)

This the final report for the project "Large-Scale Optimization for Bayesian Inference in Complex Systems," for the work in the group of the co-PI George Biros.

Biros, George

2014-08-18T23:59:59.000Z

117

Final Report  

SciTech Connect (OSTI)

This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

DeTar, Carleton [P.I.

2012-12-10T23:59:59.000Z

118

Estimating the seismic stability of the arch dam in the Chirkeiskaya hydrosystem  

SciTech Connect (OSTI)

A calculation analysis of the arch dam constructed in an area with standardized seismicity of magnitude 9-10 is presented.

Khrapkov, A. A.; Skomorovskaya, E. Ya

2004-11-15T23:59:59.000Z

119

Damming the Mekong: the social, economic and environmental consequences of the Nam Theun 2 Hydroelectric Project.  

E-Print Network [OSTI]

??More than a decade after the World Bank was forced out of the dam-building industry due to the social and environmental consequences of the projects… (more)

Wolf, Jason

2013-01-01T23:59:59.000Z

120

Dam Safety Rules (West Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Safety Rules (West Virginia) Safety Rules (West Virginia) Dam Safety Rules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State West Virginia Program Type Safety and Operational Guidelines Provider Department of Environmental Protection This establishes requirements relating to the design, placement, construction, enlargement, alteration, removal, abandonment, and repair of

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Final Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Final Report to Improved Reservoir Access Through Refracture Treatments in Tight Gas Sands and Gas Shales 07122-41.FINAL June 2013 PI Mukul M. Sharma The University of Texas at Austin 200 E. Dean Keeton St. Stop C0300 Austin, Texas 78712 (512) 471---3257 msharma@mail.utexas.edu LEGAL NOTICE This report was prepared by The University of Texas at Austin as an account of work sponsored by the Research Partnership to Secure Energy for America, RPSEA. Neither RPSEA members of RPSEA, the National Energy Technology Laboratory, the U.S. Department of Energy, nor any person acting on behalf of any of the entities: a. MAKES ANY WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED WITH RESPECT TO ACCURACY, COMPLETENESS, OR USEFULNESS OF THE INFORMATION CONTAINED IN THIS DOCUMENT, OR THAT THE

122

and 19% of the stomachs of late-lifted fish were Food of the striped bass at Holyoke Dam was  

E-Print Network [OSTI]

below hydroelectric dams and feed on the parts of fish (anadromous or freshwater species) that die Kaplan turbine at a low-head hydroelectric dam. North Am. J. Fish. Manage. 5:33-38. HOLLIS, E. H. 1952

123

Water quality and sedimentation implications of installing a hydroelectric dam on the Río Baker in Chilean Patagonia  

E-Print Network [OSTI]

HidroAysen, a Chilean corporation operated by energy giant Endesa, has proposed to build two hydroelectric dams on the Rio Baker in the Aysin Region of Chilean Patagonia. The proposed dams have been met with a variety of ...

Leandro, Gianna Dee

2009-01-01T23:59:59.000Z

124

Dam and Hydroelectric Powerplant University of Hawai`i CEE 491University of Hawai`i CEE 491  

E-Print Network [OSTI]

Karun 3 Dam and Hydroelectric Powerplant University of Hawai`i ­ CEE 491University of Hawai`i ­ CEE;Location #12;Description/Background Hydroelectric dam on Karun River Help with national energy needs

Prevedouros, Panos D.

125

Research Report Long lasting effects of rearing by an ethanol-consuming dam  

E-Print Network [OSTI]

Research Report Long lasting effects of rearing by an ethanol-consuming dam on voluntary ethanol rats as subjects, we examined effects of exposure during weaning to a dam consuming ethanol on adolescents' later affinity for ethanol. In a preliminary experiment, we offered rat pups a choice between 8

Galef Jr., Bennett G.

126

Do dams and levees impact nitrogen cycling? Simulating the effects of flood alterations on floodplain  

E-Print Network [OSTI]

Do dams and levees impact nitrogen cycling? Simulating the effects of flood alterations topography with a model of hydrology and nitrogen biogeochemistry to simulate floods of different magnitude a generalized floodplain biogeochemical model to determine whether dams and flood-control levees affect

Turner, Monica G.

127

Uncertainty analysis of river flooding and dam failure risks using local sensitivity computations.  

E-Print Network [OSTI]

to GUA while requiring only one simulation instead of several hundreds or thousands. For the floodUncertainty analysis of river flooding and dam failure risks using local sensitivity computations) for uncertainty analysis with respect to two major types of risk in river hydrodynamics: flash flood and dam

Paris-Sud XI, Université de

128

Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado  

E-Print Network [OSTI]

Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado Victor G. deWolfe a, Colorado School of Mines, Golden, CO 80401, United States b Florida Water Conservancy District, Lemon Dam May 2007 Abstract To reduce the hazards from debris flows in drainage basins burned by wildfire

129

Independent External Peer Review Report Rough River Dam 18 August 2011 ii  

E-Print Network [OSTI]

#12;Independent External Peer Review Report ­ Rough River Dam 18 August 2011 ii This page intentionally blank. #12;Independent External Peer Review Report ­ Rough River Dam 18 August 2011 iii Table.3 Preparation and Charge for Peer Review Panel 7 3.4 Performing the IEPR 8 3.5 Preparation and Review of Draft

US Army Corps of Engineers

130

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

131

Dam Control and Safety Act (West Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Control and Safety Act (West Virginia) Control and Safety Act (West Virginia) Dam Control and Safety Act (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State West Virginia Program Type Safety and Operational Guidelines Provider Department of Environmental Protection This law grants authority to the secretary of the Department of Environmental Protection to control and exercise regulatory jurisdiction

132

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

133

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

134

FINAL REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FINAL REPORT AEC-ERDA Research Contract AT (11-1) 2174 Columbia University's Nevis Laboratories "Research in Neutron Velocity Spectroscopy" James RainwatGr DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or

135

Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

136

Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

137

Final Cover.qxd  

Broader source: Energy.gov (indexed) [DOE]

Pictures Pictures (front to back) The McNary Dam on the lower Columbia River along the border of Oregon and Washington Wind turbines at Tehachapi, California Tennessee Valley Authority's Shawnee Plant in West Paducah, Kentucky Table of Contents Inspector General's Message . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Management Challenges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 National Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Environmental Cleanup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Contract Administration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Project Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

138

Environmental Impact Statements (EIS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 25, 2005 November 25, 2005 EIS-0372: Final Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect September 1, 2005 EIS-0351: Final Environmental Impact Statement Operation of Flaming Gorge Dam August 26, 2005 EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect August 5, 2005 EIS-0355: Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah July 1, 2005 EIS-0353: Final Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program April 29, 2005 EIS-0348: Final Site-wide Environmental Impact Statement Continued Operation of Lawrence Livermore National Laboratory and

139

EA-1894: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment Final Environmental Assessment EA-1894: Final Environmental Assessment DOE's Bonneville Power Administration and the U.S. Army Corps of Engineers, as co-lead Federal agencies, prepared this EA to evaluate the potential environmental impacts of a proposal to operate Albeni Falls dam during the winter months (approximately December 15th to March 31st) and determine whether the existing Columbia River System Operation Review EIS (DOE/EIS-0170) is adequate or a supplemental or new EIS is required. Chapter 9 of the EA consists of a finding of no significant impact and a finding that a supplemental or new EIS is not required. FInal Environmental Assessment and FONSI Appendix A - Ice Best Management Practice Appendix B - Historical Winter Elevations of Lake Pend Oreille

140

Water-Power Development, Conservation of Hydroelectric Power Dams and Works  

Broader source: Energy.gov (indexed) [DOE]

Water-Power Development, Conservation of Hydroelectric Power Dams Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) Water-Power Development, Conservation of Hydroelectric Power Dams and Works (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Systems Integrator Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Virginia Program Type Siting and Permitting Provider Virginia State Corporation Commission It is the policy of the Commonwealth of Virginia to encourage the utilization of its water resources to the greatest practicable extent, to control the waters of the Commonwealth, and also to construct or reconstruct dams in any rivers or streams within the Commonwealth for the

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Wind Tunnel Experiments and Numerical Simulation of Snow Drifting around an Avalanche Protecting Dam  

Science Journals Connector (OSTI)

To learn about wind flow and snow drifting around avalanche dams, ... experiments were done in the Jules Verne Climatic Wind Tunnel. The paper reports the results from numerical wind flow simulations that were do...

Skuli Thordarson

2002-12-01T23:59:59.000Z

142

Two-dimensional dam break flooding simulation: a GIS-embedded approach  

Science Journals Connector (OSTI)

In the twenty-first century, around 200 notable dam and reservoir failures happened worldwide causing massive fatalities and economic costs. In order to reduce the losses, managers usually define mitigation st...

Massimiliano Cannata; Roberto Marzocchi

2012-04-01T23:59:59.000Z

143

Shape optimization of arch dams under earthquake loading using meta-heuristic algorithms  

Science Journals Connector (OSTI)

This paper presents efficiency of three meta-heuristic algorithms for large-scale shape optimization of double curvature arch dams under seismic loading condition with different constraints such as failure, st...

A. Kaveh; V. R. Mahdavi

2013-11-01T23:59:59.000Z

144

EIS-0480: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam  

Broader source: Energy.gov [DOE]

Two agencies of the Department of the Interior, Bureau of Reclamation and National Park Service, are jointly preparing a Long-Term Experimental and Management Plan for the Glen Canyon Dam and an EIS for adoption of the Plan. The Glen Canyon Dam, on the Colorado River in northern, Arizona, generates hydroelectric power that is marketed by DOE's Western Area Power Administration, a cooperating agency.

145

Hydropower and the environment: A case study at Glen Canyon Dam  

SciTech Connect (OSTI)

The management of hydroelectric resources in the Colorado River requires a balancing of hydrologic, social, natural and cultural resources. The resulting management often has to deal with inherently conflicting objectives, short and long-term goals, time frames and operational flexibility. Glen Canyon Dam, AZ, on the Colorado River, controls the release of water into the Grand Canyon. The dam has been under intense public scrutiny since it was completed in 1963. An Environmental Impact Statement evaluating the future operations and options for Glen Canyon Dam was initiated by the Department of the Interior in 1989 and completed in 1995. An Adaptive Management approach to future operational management has been developed as part of the Glen Canyon Dam Environmental Impact Statement process. Future operations at Glen Canyon Dam will take into consideration the need to balance water movement and hydroelectricity development with natural, recreation, Native American and cultural needs. Future management of rivers requires acknowledgement of the dynamic nature of ecosystems and the need to link scientific information into the decision-making process. Lessons learned and programs developed at Glen Canyon Dam may be applied to other river systems.

Wegner, D.L. [Denver Technical Service Center, Flagstaff, AZ (United States)

1995-12-31T23:59:59.000Z

146

3D Simulation of Dam-break effect on a Solid Wall using Smoothed Particle Hydrodynamics  

E-Print Network [OSTI]

Dam is built for water supply, water flow or flooding control and electricity energy storage, but in other hand, dam is one of the most dangerous natural disaster in many countries including in Indonesia. The impact of dam break in neighbour area and is huge and many flooding in remote area, as happen in Dam Situ Gintung in Tangerang (close to Jakarta) in 2009. Smoothed Particle Hydrodynamics (SPH), is one of numerical method based on Lagrangian grid which is ap- plied in astrophysical simulation may be used to solve the simulation on dam break effect. The development of SPH methods become alternative methods to solving Navier Stokes equation, which is main key in fluid dynamic simulation. In this paper, SPH is developed for supporting solid par- ticles in use for 3D dam break effect (3D-DBE) simulation. Solid particle have been treated same as fluid particles with additional calculation for converting gained position became translation and rotation of solid object in a whole body. With this capability, the r...

Suprijadi,; Naa, Christian; Putra, Anggy Trisnawan

2013-01-01T23:59:59.000Z

147

Occurrence, fate and ecotoxicological assessment of pharmaceutically active compounds in wastewater and sludge from wastewater treatment plants in Chongqing, the Three Gorges Reservoir Area  

Science Journals Connector (OSTI)

Abstract The occurrence, removal and ecotoxicological assessment of 21 pharmaceutically active compounds (PhACs) including antibiotics, analgesics, antiepileptics, antilipidemics and antihypersensitives, were studied at four municipal wastewater treatment plants (WWTP) in Chongqing, the Three Gorges Reservoir Area. Individual treatment unit effluents, as well as primary and secondary sludge, were sampled and analyzed for the selected PhACs to evaluate their biodegradation, persistence and partitioning behaviors. PhACs were identified and quantified using high performance liquid chromatography/tandem mass spectrometry after solid-phase extraction. All the 21 analyzed PhACs were detected in wastewater and the target PhACs except acetaminophen, ibuprofen and gemfibrozil, were also found in sludge. The concentrations of the antibiotics and SVT were comparable to or even higher than those reported in developed countries, while the case of other target PhACs was opposite. The elimination of PhACs except acetaminophen was incomplete and a wide range of elimination efficiencies during the treatment were observed, i.e. from “negative removal” to 99.5%. The removal of PhACs was insignificant in primary and disinfection processes, and was mainly achieved during the biological treatment. Based on the mass balance analysis, biodegradation is believed to be the primary removal mechanism, whereas only about 1.5% of the total mass load of the target PhACs was removed by sorption. Experimentally estimated distribution coefficients (< 500 L/kg, with a few exceptions) also indicate that biodegradation/transformation was responsible for the removal of the target PhACs. Ecotoxicological assessment indicated that the environment concentrations of single compounds (including sulfadiazine, sulfamethoxazole, ofloxacin, azithromycin and erythromycin-H2O) in effluent and sludge, as well as the mixture of the 21 detected PhACs in effluent, sludge and receiving water had a significant ecotoxicological risk to algae. Therefore, further control of PhACs in effluent and sludge is required before their discharge and application to prevent their introduction into the environment.

Qing Yan; Xu Gao; You-Peng Chen; Xu-Ya Peng; Yi-Xin Zhang; Xiu-Mei Gan; Cheng-Fang Zi; Jin-Song Guo

2014-01-01T23:59:59.000Z

148

(DOE/EIS-0183-SA-05): Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, 10/17/02  

Broader source: Energy.gov (indexed) [DOE]

October 17, 2002 October 17, 2002 REPLY TO ATTN OF: KECP-4 SUBJECT: Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, DOE/EIS-0183-SA-05 memorandum Mark A. Jones Program Analyst - PGF-6 TO : Proposed Action: Boise River Diversion Dam - Amendment to Capital Investment Sub-Agreement, Contract Number DE-MS79-94BP94618 Proposed By: Bonneville Power Administration (BPA) and Bureau of Reclamation (Reclamation) Location: Near Boise, in Ada County, Idaho Description of the Proposed Action: BPA proposes to fund Reclamation's rehabilitation of the powerplant at the existing Boise River Diversion Dam (Diversion Dam) to use the water resource at Diversion Dam for electrical power production. Analysis: The Diversion Dam is located about 7 miles southeast of Boise, Idaho on the Boise River, about

149

EA-1747: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Final Environmental Assessment 7: Final Environmental Assessment EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky Flats Site, Colorado The RFS is owned by the United States and is located in northern Jefferson County, Colorado, approximately 16 miles northwest of Denver. The RFS was formerly used to process and manufacture nuclear weapons components, but cleanup and closure of Rocky Flats by the U.S. Department of Energy (DOE) was completed in 2005. The Office of Legacy Management (LM) has jurisdiction and control of portions of Rocky Flats. The purpose of the Proposed Action is to reduce or eliminate the retention of surface water to return the RFS surface water flow configuration to the approximate conditions existing prior to construction of the dams.

150

EA-1617: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment Final Environmental Assessment EA-1617: Final Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana For more information, contact: Mr. Jim Hartman A7400 Natural Resource Office Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228 Electronic mail: LovellYellowtailEA@wapa.gov Western Area Power Administration proposes to rebuild the Lovell to Yellowtail No. 1 and No. 2 and the Basin to Lovell 115-kV transmission lines. The lines are located between Lovell, Wyoming, and Yellowtail Dam, Montana, and between Lovell and Basin, WY. The Lovell to Yellowtail No. 1 and No. 2 transmission lines were constructed by the Bureau of Reclamation in 1956 and 1966,

151

EA-1617: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1617: Final Environmental Assessment EA-1617: Final Environmental Assessment EA-1617: Final Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana For more information, contact: Mr. Jim Hartman A7400 Natural Resource Office Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228 Electronic mail: LovellYellowtailEA@wapa.gov Western Area Power Administration proposes to rebuild the Lovell to Yellowtail No. 1 and No. 2 and the Basin to Lovell 115-kV transmission lines. The lines are located between Lovell, Wyoming, and Yellowtail Dam, Montana, and between Lovell and Basin, WY. The Lovell to Yellowtail No. 1 and No. 2 transmission lines were constructed by the Bureau of Reclamation in 1956 and 1966,

152

EIS-0425: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0425: Final Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in

153

EA-1665: Final Environmental Assessment and Finding of No Significant  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment and Finding of No Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV Transmission Line Rebuild Project, Mohave County, Arizona For more information, contact: Ms. Linette King Desert Southwest Region Western Area Power Administration P.O. Box 6457 Phoenix, AZ 85005-6457 Telephone: 602-605-2434 Fax: 602-605-2630 Electronic mail: lking@wapa.gov The Western Area Power Administration (Western) plans to rebuild a 26.2-mile-long portion of the existing Davis-Kingman Tap 69-kilovolt (kV) Transmission Line located in Mohave County,Arizona. The existing Davis-Kingman Tap 69-kV Transmission Line originates in Bullhead City, Arizona, at the Davis Dam Switchyard and extends northwest of Kingman, Arizona, four

154

Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

2011-03-01T23:59:59.000Z

155

A Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In  

Open Energy Info (EERE)

Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In A Philippine Aborigine Legend Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo Described In A Philippine Aborigine Legend Details Activities (0) Areas (0) Regions (0) Abstract: The prehistoric eruptions of Mount Pinatubo have followed a cycle: centuries of repose terminated by a caldera-forming eruption with large pyroclastic flows; a post-eruption aftermath of rain-triggered lahars in surrounding drainages and dome-building that fills the caldera; and then another long quiescent period. During and after the eruptions lahars descending along volcano channels may block tributaries from watersheds

156

Glen Canyon Dam Long-Term Experimental and Management Plan EIS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Glen Canyon LTEMP EIS Glen Canyon LTEMP EIS Glen Canyon Dam, a 1,300-MW water-storage and hydroelectric facility is located on the Colorado River upstream of the Grand Canyon. EVS is evaluating the effects of dam operations on the Colorado River. A comprehensive evaluation of Glen Canyon Dam operations and their effects on the Colorado River through the Grand Canyon is being conducted by the Department of the Interior with EVS assistance. The Long-Term Experimental and Management Plan (LTEMP) Environmental Impact Statement (EIS) - the first such evaluation in over 15 years - will examine flow regimes to meet the goals of supplying water for communities, agriculture, and industry and will protect the resources of the Grand Canyon, while providing clean hydropower. The LTEMP EIS, which is expected to be completed by the end of 2013, will

157

A biometrical evaluation of relationships between dam weight and progeny preweaning performance in beef cattle  

E-Print Network [OSTI]

. "' F&. 0 I. 2 7 vari at ion. For hei fers in the two and six to nine age-of- dam categor i es, the F-r at los for heterogene i ty of regres- s ion coeff icients for birth weight were greater than one, but not s i gn i f i cant . These were the two...-?Isis sex-of ? progeny subcl asses. The model f it led for birth weight (BW), 100-day weight (WW), and preweaning aver age da i iy gain IADG) in each subclass included year and season of bi r I'h, d m wc i gist, dam we i qh I squared, and dam weiqht...

Smith, Gerald Max

2012-06-07T23:59:59.000Z

158

Fish Migration, Dams, and Loss of Ecosystem Services in the Mekong Basin  

SciTech Connect (OSTI)

The past decade has seen increased international recognition of the importance of the services provided by natural ecosystems. It is unclear however whether such international awareness will lead to improved environmental management in many regions. We explore this issue by examining the specific case of fish migration and dams on the Mekong river. We determine that dams on the Mekong mainstem and major tributaries will have a major impact on the basin's fisheries and the people who depend upon them for food and income. We find no evidence that current moves towards dam construction will stop, and consider two scenarios for the future of the fisheries and other ecosystems of the basin. We conclude that major investment is required in innovative technology to reduce the loss of ecosystem services, and alternative livelihood strategies to cope with the losses that do occur

Dugan, Patrick J. [WorldFish Center; Barlow, Chris [Australian Center for International Agricultural Research (ACIAR); Agostinho, Angelo A. [Fundacao University, Parana Brazil; Baran, Eric [WorldFish Center; Cada, Glenn F [ORNL; Chen, Daqing [Yangtze River Fisheries Research Institute, People's Republic of China; Cowx, Ian G. [Hull International Fisheries Research Institute, England; Ferguson, John W. [North West Fisheries Science Center, Seattle, WA; Jutagate, Tuantong [Ubon Ratchathani University, Ubon Ratchathani, Thailand; Mallen-Cooper, Martin [Fishway Consulting Service, Australia; Marmulla, Gerd [Food and Agriculture Organization of the United Nations (FAO), Rome, Italy; Nestler, John [USA Corps Engineers, Concord, MA USA; Petrere, Miquel [Universidade Estadual Paulista, Rio Claro, Brazil; Winemiller, Kirk O. [Texas A& M University

2010-06-01T23:59:59.000Z

159

Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008  

SciTech Connect (OSTI)

Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

2010-02-12T23:59:59.000Z

160

Pages 41-52 Short-term effects of small dam removal on a freshwater mussel assemblage.  

E-Print Network [OSTI]

with appropriate planning, timing, and removal techniques, but additional monitoring is warrantePages 41-52 Short-term effects of small dam removal on a freshwater mussel assemblage. Ryan J 1053-637X EDITORIAL REVIEW BOARD #12;SHORT-TERM EFFECTS OF SMALL DAM REMOVAL ON A FRESHWATER MUSSEL

Kwak, Thomas J.

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Apparatus for efficient sidewall containment of molten metal with horizontal alternating magnetic fields utilizing a ferromagnetic dam  

DOE Patents [OSTI]

An apparatus is disclosed for casting sheets of metal from molten metal. The apparatus includes a containment structure having an open side, a horizontal alternating magnetic field generating structure and a ferromagnetic dam. The magnetic field and the ferromagnetic dam contain the molten metal from leaking out side portions of the open side of the containment structure. 25 figs.

Praeg, W.F.

1997-02-11T23:59:59.000Z

162

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

2004-02-01T23:59:59.000Z

163

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-03-01T23:59:59.000Z

164

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-07T23:59:59.000Z

165

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release

166

Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1995 Annual Report.  

SciTech Connect (OSTI)

The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flathead Lake.{close_quotes}

Fredenberg, Wade; Carty, Daniel (US Fish and Wildlife Service, Kalispell, MT); Cavigli, Jon (Montana Department of Fish, Wildlife and Parks, Kalispell, MT)

1996-06-01T23:59:59.000Z

167

Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007  

SciTech Connect (OSTI)

The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

2008-12-01T23:59:59.000Z

168

Gravity currents with tailwaters in Boussinesq and non-Boussinesq systems: two-layer shallow-water dam-break solutions and Navier–Stokes simulations  

Science Journals Connector (OSTI)

We consider the dam-break initial stage of propagation of a gravity current of density $$\\rho _{c}$$ ...

M. Ungarish; Z. Borden; E. Meiburg

2014-04-01T23:59:59.000Z

169

A new way to study teaching in animals: despite demonstrable benefits, rat dams do not teach their young what to eat  

E-Print Network [OSTI]

by mothers would be effective, if it occurred. We examined food choices of rat dams trained to eat one of twoA new way to study teaching in animals: despite demonstrable benefits, rat dams do not teach taught are large. Here, we determined, first, whether Rattus novegicus dams would modify their food

Galef Jr., Bennett G.

170

An Assessment of Energy Potential at Non-Powered Dams in the United States  

Broader source: Energy.gov [DOE]

An Assessment of Energy Potential at Non-Powered Dams in the United States- The United States has produced clean, renewable electricity from hydropower for more than 100 years, but hydropower producing facilities represent only a fraction of the infrastructure development that has taken place on the nation’s waterways.

171

Passive revolution in the green economy: activism and the Belo Monte dam  

Science Journals Connector (OSTI)

Belo Monte is slated to be the world’s third largest dam, and it is Brazil’s largest infrastructure project, at a cost of at least USD 13 billion. It is forecast to produce around 11,000 GW of energy

Eve Bratman

2014-11-01T23:59:59.000Z

172

Durability Assessment of an Arch Dam using Inverse Analysis with Neural Networks and High Performance Computing.  

E-Print Network [OSTI]

the viscoelastic parameters; 3D FEM analysis using High Performance Computing (parallel and vector features) to run Performance Computing. E. M. R. Fairbairn, E. Goulart, A. L. G. A. Coutinho, N. F. F. Ebecken COPPEDurability Assessment of an Arch Dam using Inverse Analysis with Neural Networks and High

Coutinho, Alvaro L. G. A.

173

Assessment of Natural Stream Sites for Hydroelectric Dams in the Pacific Northwest Region  

SciTech Connect (OSTI)

This pilot study presents a methodology for modeling project characteristics using a development model of a stream obstructing dam. The model is applied to all individual stream reaches in hydrologic region 17, which encompasses nearly all of Idaho, Oregon, and Washington. Project site characteristics produced by the modeling technique include: capacity potential, principal dam dimensions, number of required auxiliary dams, total extent of the constructed impoundment boundary, and the surface area of the resulting reservoir. Aggregated capacity potential values for the region are presented in capacity categories including total, that at existing dams, within federal and environmentally sensitive exclusion zones, and the balance which is consider available for greenfield development within the limits of the study. Distributions of site characteristics for small hydropower sites are presented and discussed. These sites are screened to identify candidate small hydropower sites and distributions of the site characteristics of this site population are presented and discussed. Recommendations are made for upgrading the methodology and extensions to make the results more accessible and available on a larger scale.

Douglas G. Hall; Kristin L. Verdin; Randy D. Lee

2012-03-01T23:59:59.000Z

174

Updating of Safety Criteria for Basic Diagnostic Indicators of Dam at the Sayano-Shushenskaya HPP  

SciTech Connect (OSTI)

Values of diagnostic indicators [K]-limitations placed on radial displacements and turn angles of horizontal sections of the dam - which are permitted for each upper-pool level within the range from 520 to 539 m are determined and proposed for inclusion in the Declaration of Safety. Empirical relationships used to develop safety criteria K1 and K2 are modified.

Gordon, L. A.; Skvortsova, A. E. [JSC 'VNIIG im. B. E. Vedeneeva' (Russian Federation)] [JSC 'VNIIG im. B. E. Vedeneeva' (Russian Federation)

2013-09-15T23:59:59.000Z

175

Analysis of Seismic Activity near Theodore Roosevelt Dam, Arizona, during the Occupation  

E-Print Network [OSTI]

E Analysis of Seismic Activity near Theodore Roosevelt Dam, Arizona, during the Occupation, and Lepolt Linkimer Online Material: Plot of viable focal mechanisms and table of regional seismic velocity model. INTRODUCTION Rate and distribution of seismic activity are important indica- tors of the overall

Fouch, Matthew J.

176

ANCOLD 2000 Conference on Dams 1 ADVANCES IN THE PRACTICE AND USE OF  

E-Print Network [OSTI]

business environment. In addition to engineering inputs, the new decision paradigm involves manifold, Ph.D., P.E., P.H., F.ASCE. Professor, Utah State University and Principal, RAC Engineers & Economists, Utah, USA. 2 A portfolio is a group of dams, which are the responsibility of a single owner

Bowles, David S.

177

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

178

Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA  

SciTech Connect (OSTI)

Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

Johnson, Gary E.; Khan, Fenton; Skalski, J. R.; Klatte, Bernard A.

2013-11-20T23:59:59.000Z

179

Ice storm impacts on woody debris and debris dam formation in northeastern U.S. streams  

E-Print Network [OSTI]

Ice storm impacts on woody debris and debris dam formation in northeastern U.S. streams Clifford E and associated streams. During 1999 and 2000, tree canopy damage, stream physical habitat, and wood deposition were evaluated within 51 first-, second-, and third-order streams located within five eastern

Kraft, Clifford E.

180

Thorium isotopes in colloidal fraction of water from San Marcos Dam, Chihuahua, Mexico  

Science Journals Connector (OSTI)

The main interest of this stiidy is to assess the contents and distribution of Th-series isotopes in colloidal fraction of surface water from San Marcos dam because the suspended particulate matter serves as transport medium for several pollutants. The aim of this work was to assess the distribution of thorium isotopes ( 232 Th and 230 Th ) contained in suspended matter. Samples were taken from three surface points along the San Marcos dam: water input midpoint and near to dam wall. In this last point a depth sampling was also carried out. Here three depth points were taken at 0.4 8 and 15 meters. To evaluate the thorium behavior in surface water from every water sample the colloidal fraction was separated between 1 and 0.1 ?m. Thorium isotopes concentraron in samples were obtained by alpha spectrometry. Activity concentrations obtained of 232 Th and 230 Th in surface points ranged from 0.3 to 0.5 Bq ? L-1 whereas in depth points ranged from 0.4 to 3.2 Bq ? L-1 respectively. The results show that 230 Th is in higher concentration than 232 Th in colloidal fraction. This can be attributed to a preference of these colloids to adsorb uranium. Thus the activity ratio 230 Th / 232 Th in colloidal fraction showed values from 2.3 to 10.2. In surface points along the dam 230 Th activity concentration decreases while 232 Th concentration remains constant. On the other hand activity concentrations of both isotopes showed a pointed out enhancement with depth. The results have shown a possible lixiviation of uranium from geological substrate into the surface water and an important fractionation of thorium isotopes which suggest that thorium is non-homogeneously distributed along San Marcos dam.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Giant otter population responses to habitat expansion and degradation induced by a mega hydroelectric dam  

Science Journals Connector (OSTI)

Abstract Large hydroelectric dams are major drivers of habitat loss and degradation in lowland Amazonia. Hydroelectric reservoirs reduce the habitat available for terrestrial species, but create new open-water and shoreline lake habitat that can potentially boost populations of aquatic and semi-aquatic species, such as the threatened giant otter (Pteronura brasiliensis). To assess the impacts of mega-dams on this apex-predator, we surveyed the giant otter population across the 443,772-hectare Balbina Hydroelectric Reservoir of central Brazilian Amazonia between 14 and 25 years after this reservoir creation. We compared changes in habitat area and estimated giant otter population size between the reservoir pre- and post-filling stages. The Balbina dam created ?3525 islands and increased the open-water surface and total reservoir perimeter available to otters by a factor of 62.7 and 8.9, respectively. Some 25 years after damming, however, the estimated post-filling giant otter population size was only twice greater than that estimated before filling and 4.5 times smaller than would be predicted given the total available habitat area and density of dens quantified at a neighbouring undisturbed area used as a surrogate of the pre-filling phase. The observed mismatch between the proportional increase in otter population size and the much greater newly available reservoir habitat area is likely due to low habitat quality in terms of low fish prey productivity and scarcity of suitable sites for denning and territory demarcation. This should be considered in strategic environmental impact assessments of planned hydroelectric dams and in managing existing and future hydropower development in lowland tropical forests.

Ana Filipa Palmeirim; Carlos A. Peres; Fernando C.W. Rosas

2014-01-01T23:59:59.000Z

182

The Impacts of Wind Power Integration on Sub-Daily Variation in River Flows Downstream of Hydroelectric Dams  

Science Journals Connector (OSTI)

The Impacts of Wind Power Integration on Sub-Daily Variation in River Flows Downstream of Hydroelectric Dams ... Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. ... In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). ...

Jordan D. Kern; Dalia Patino-Echeverri; Gregory W. Characklis

2014-07-25T23:59:59.000Z

183

NIF Final Optics Assemblies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NIF Final Optics Assemblies The Final Optics Assemblies (FOAs) are the last element of the main laser system and the first of the target area systems. Each FOA contains four...

184

MHK Projects/Lock and Dam No 2 Hydroelectric Project | Open Energy  

Open Energy Info (EERE)

Lock and Dam No 2 Hydroelectric Project Lock and Dam No 2 Hydroelectric Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.7486,"lon":-92.8048,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

185

MISCELLANEOUS PAPER S71-17 EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL DAMS  

Office of Legacy Management (LM)

MISCELLANEOUS PAPER S71-17 MISCELLANEOUS PAPER S71-17 EARTHQUAKE RESISTANCE OF EARTH AND ROCK-FILL DAMS Report 2 ANALYSIS OF RESPONSE O F RIFLE.GAP D A M TO PROJECT RULISON UNDERGROUND NUCLEAR DETONATION bv J. E. Ahlberg, J. Fowler, L W. Heller ........ . . . . . . . . - . . . . . . . . . . . . . . . - . . - ...... *- , .... . . . - ->-w-J- * - : - . . June 1972 s~omsored by Office, Chief of Engineers, U. S. Army Conducted by U. S. A m y Engineer Waterways Experiment Station Soils and Pavements Laboratory Vicksburg, Mississippi APPROVED FOR WBLlC RELEASE: DISTRIBUTION UNLIMITED L i s t o f Associated Reports Previous reports under Engineering Study 540 are: "A Comparative Summary o f Current Earth Dam Analysis Methods for Earthquake Response," issued by Office, Chief o f Engineers, a s Inclosure 1 to Engineer

186

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

2012-09-01T23:59:59.000Z

187

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

2011-12-01T23:59:59.000Z

188

Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

1990-09-01T23:59:59.000Z

189

Oxygenation cost estimates in 1983 dollars for Cherokee and Douglas Dams  

SciTech Connect (OSTI)

As part of the Reservoir Releases Program, estimates of costs associated with providing high purity oxygen injection systems at Cherokee and Douglas Dams were computed in 1983 dollars. This report presents results of the computations. An 8.125% interest rate, a 25-year economic life, and a 10-year diffuser life were assumed. Weekly average dissolved oxygen concentration (DO) and turbine flowrate data were available for the years 1958 through 1980. 4 refs., 6 figs., 3 tabs.

Fain, T.G.; Boyd, J.W.

1983-12-01T23:59:59.000Z

190

Scientific substantiation of safe operation of the Earthen Dams at the Votkinsk HPP  

SciTech Connect (OSTI)

Over a period of 15 years, coworkers of the B. E. Vedeneev Scientific-Research Institute of Hydraulic Engineering have conducted scientific accompaniment of the operation of the earthen dams at the Votkinsk HPP. During that time, basic performance characteristics associated with complex hydrogeologic and hydrochemical conditions, and the forms of their unfavorable manifestations influencing the reliability and safety of the structures were revealed, and, recommendations and measures were developed for their elimination.

Deev, A. P.; Fisenko, V. F. [Votkinsk HPP Branch of the JSC 'RusGidro,' Chaikovskii (Russian Federation); Sol'skii, S. V.; Lopatina, M. G.; Gints, A. V.; Aref'eva, A. N. [JSC 'VNIIG im. B. E. Vedeneeva', Branch of JSC 'RusGidro' (Russian Federation)

2012-11-15T23:59:59.000Z

191

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project  

SciTech Connect (OSTI)

Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

2013-06-25T23:59:59.000Z

192

Alternatives for physically modifying John Sevier detention dam to allow fish passage  

SciTech Connect (OSTI)

Studies conducted in the vicinity of John Sevier Steam-Electric Plant (JSF) indicated some modification of the fish assemblage from that expected. By blocking movements of fish between Cherokee Reservoir and the upper Holston River, John Sevier detention dam has affected the fisheries in both systems. Providing passage for river-spawning fish at John Sevier detention dam might improve fish communities and fisheries in Cherokee Reservoir as well as upstream habitats. This would include enhanced reproductive success of river-spawning species found in Cherokee Reservoir (e.g., white bass and possibly striped bass and paddlefish) and repopulation of John Sevier Reservoir and the upper Holston River by several species presently found only downstream of the detention dam. TVA has identified and studied several alternatives that alone or in combination might improve the fisheries. Cost estimates were developed for three alternatives. These three alternatives with cost estimates are discussed briefly along with two other alternatives for which cost estimates have not been made. Merits of the three alternatives which have at least some possibility to improve migratory fish stocks are discussed in detail. 5 references.

Not Available

1984-09-01T23:59:59.000Z

193

Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam  

SciTech Connect (OSTI)

At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.

Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

2007-01-30T23:59:59.000Z

194

Delivery of the Canadian Entitlement Final Environmental Impact Statement January 1996  

Broader source: Energy.gov (indexed) [DOE]

1996/01eis0197_map.html[6/27/2011 12:03:04 PM] 1996/01eis0197_map.html[6/27/2011 12:03:04 PM] Map Section Map #1 Map #2 Map #3 Map #4 Map #5 Map #6 Delivery of the Canadian Entitlement Final Environmental Impact Statement January 1996 file:///I|/Data%20Migration%20Task/EIS-0197-FEIS-1996/eis0197_1.html[6/27/2011 12:03:02 PM] Chapter 1: Purpose of and Need for Action 1.1 Need for Action The Columbia River Treaty (Treaty) between Canada and the United States of America required three storage dams to be constructed on the Columbia River system in Canada and allowed for one in the United States. The dams help control floods in both countries, and the regulated streamflow provided by the three Canadian Treaty reservoirs enables dams downstream in the United States to produce additional power ("downstream power benefits"). Canada and the

195

National Science Bowl Finals  

ScienceCinema (OSTI)

National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

None

2010-09-01T23:59:59.000Z

196

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Space Heating in U.S. Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

197

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Household Demographics of Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

198

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Fuels Used and End Uses in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

199

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Household Demographics of Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

200

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

HC.1.11 Fuels Used and End Uses in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Space Heating in U.S. Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

202

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Space Heating in U.S. Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

203

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Household Demographics of Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

204

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Space Heating in U.S. Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" " ",,,"East North Central Census...

205

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Fuels Used and End Uses in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

206

DOE Final Report  

SciTech Connect (OSTI)

This final report contains a summary of work accomplished in the establishment of a Climate Data Center at the International Arctic Research Center, University of Alaska Fairbanks.

Hinzman, Larry D.; Long, James; Newby, Greg B.

2014-01-08T23:59:59.000Z

207

Final Meeting Summary ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health, Safety, and Environmental Protection Committee November 8, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE November...

208

Final_Report.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy, Offi ce of Fossil Energy. Ormat: Low-Temperature Geothermal Power Generation Naval Petroleum Reserve No. 3, Teapot Dome Field, Wyoming Final Report for the...

209

Final Meeting Summary ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 Issue Manager Report-Out on Tank Closure and Waste Management Final Environmental Impact Statement (TC&WM FEIS) Groundwater and Vadose Zone Modeling (JOINT...

210

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam with Emphasis on the Prototype Surface Flow Outlet, 2008  

SciTech Connect (OSTI)

The main purpose of the study was to evaluate the performance of Top Spill Weirs installed at two spillbays at John Day Dam and evaluate the effectiveness of these surface flow outlets at attracting juvenile salmon away from the powerhouse and reducing turbine passage. The Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate survival of juvenile salmonids passing the dam and also for calculating performance metrics used to evaluate the efficiency and effectiveness of the dam at passing juvenile salmonids.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Monter, Tyrell J.; Johnson, Gary E.; Khan, Fenton; Wilberding, Matthew C.; Cushing, Aaron W.; Zimmerman, Shon A.; Faber, Derrek M.; Durham, Robin E.; Townsend, Richard L.; Skalski, John R.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.

2009-12-01T23:59:59.000Z

211

Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1  

SciTech Connect (OSTI)

This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

Carlson, Thomas J.; Weiland, Mark A.

2001-01-30T23:59:59.000Z

212

Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities – Phase 1: The Dalles Dam Spillway Case Study  

SciTech Connect (OSTI)

This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

Deng, Zhiqun; Serkowski, John A.; Fu, Tao; Carlson, Thomas J.; Richmond, Marshall C.

2007-12-31T23:59:59.000Z

213

Characterization of Fish Passage Conditions through the Fish Weir and Turbine Unit 1 at Foster Dam, Oregon, Using Sensor Fish, 2012  

SciTech Connect (OSTI)

This report documents investigations of downstream fish passage research involving a spillway fish weir and turbine passage conditions at Foster Dam in May 2012.

Duncan, Joanne P.

2013-02-01T23:59:59.000Z

214

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network [OSTI]

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

215

Microsoft Word - Contents-comments-Sept.doc  

Broader source: Energy.gov (indexed) [DOE]

Flaming Gorge Dam Final Environmental Impact Statement Comments on the Draft Environmental Impact Statement and Responses U.S. Department of the Interior Bureau of Reclamation Upper Colorado Region Salt Lake City, Utah September 2005 The mission of the Department of the Interior is to protect and provide access to our Nation's natural and cultural heritage and honor our trust responsibilities to Indian tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of

216

101112-FINAL.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Voice 918-595-6600 Fax 918-595-6656 www.swpa.gov The UPDATE is published by and for customers, retirees, and employees of Southwestern Power Administration like: Linda Mummey Realty Offi cer Tulsa, Oklahoma Special thanks to: Scott Carpenter Vicki Clarke Gary Cox Ruben Garcia Larry Harp William Hiller Beth Nielsen Kathy O'Neal Carrie Quick Angela Summer Mike Wech Jon Worthington U P DAT E S O U T H W E S T E R N P O W E R A D M I N I S T R A T I O N O C T O B E R - D E C E M B E R 2 0 0 8 Keystone Switchyard Switches Hands Keystone Dam Switchyard, located approximately 20 miles west of Southwestern's downtown Tulsa headquarters, became the fi rst switchyard to be transferred from the U.S. Army Corps of Engineers' Tulsa District (Corps) to Southwestern under a new Memorandum of Understanding (MOU) executed November 5, 2008.

217

Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA  

SciTech Connect (OSTI)

Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to merging and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.

Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.; Khan, Fenton; Mueller, Robert P.; Nagy, William T.; Richmond, Marshall C.; Weiland, Mark A.

2008-07-29T23:59:59.000Z

218

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008  

SciTech Connect (OSTI)

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

2009-12-28T23:59:59.000Z

219

EIS-0353: EPA Notice of Availability of the Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Final Environmental EPA Notice of Availability of the Final Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Final Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program In cooperation with MFWP, BPA is proposing to implement a conservation program to preserve the genetic purity of the westslope cutthroat trout populations in the South Fork of the Flathead River drainage. The South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program constitutes a portion of the Hungry Horse Mitigation Program. The purpose of the Hungry Horse Mitigation Program is to mitigate for the construction and operation of Hungry Horse Dam through restoring habitat, improving fish passage, protecting and recovering native fish populations, and

220

Sept.2002  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

paddled the dam-controlled waters of the Ocoee, which flows through a gorge in the Cherokee National Forest. The group chose to go for gold by tackling the upper stretch of the...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FINAL ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

222

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Household Demographics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

223

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Fuels Used and End Uses in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings...

224

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Space Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

225

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Household Demographics of U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings...

226

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Fuels Used and End Uses in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2"...

227

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Space Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Space...

228

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Space Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

229

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Space Heating in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

230

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Space Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

231

Aurora final report  

SciTech Connect (OSTI)

Final Technical report detailing the work done by Nuvera and its partners to fulfill the goals of the program "Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks" (a.k.a. AURORA)

Robert, Dross; Amedeo, Conti

2013-12-06T23:59:59.000Z

232

Final Beamline Design Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Beamline Design Report Final Beamline Design Report Guidelines and Review Criteria (SCD 1.20.95) 6.0 Final Beamline Design Report (FDR) Overview The Final Beamline Design Report is part of the Advanced Photon Source (APS) beamline review process and should be planned for when approximately 90% of the total beamline design has been completed. Fifteen copies of the FDR are to be submitted to the APS Users Office. Approval of the Collaborative Access Team's (CAT) designs described in the report is required prior to installation of beamline components in the APS Experiment Hall. Components that have a long lead time for design or procurement can be reviewed separately from the remainder of the beamline, but enough information must be provided so that the reviewer can understand the

233

Under very extreme conditions a flood that threatens to overtop a dam may be combined with strong winds that generate waves in the reservoir.  

E-Print Network [OSTI]

Under very extreme conditions a flood that threatens to overtop a dam may be combined with strong winds that generate waves in the reservoir. Prolonged wave overtopping or a combination of wave the actions of wind generated waves and wave overtopping. The uneven elevations of the dam crest

Bowles, David S.

234

Impacts of elevation data spatial resolution on two-dimensional dam break flood simulation and consequence assessment  

SciTech Connect (OSTI)

A grid resolution sensitivity analysis using a two-dimensional flood inundation model has been presented in this paper. Simulations for 6 dam breaches located randomly in the United States were run at 10,30,60,90, and 120 meter resolutions. The dams represent a range of topographic conditions, ranging from 0% slope to 1.5% downstream of the dam. Using 10 meter digital elevation model (DEM) simulation results as the baseline, the coarser simulation results were compared in terms of flood inundation area, peak depths, flood wave travel time, daytime and nighttime population in flooded area, and economic impacts. The results of the study were consistent with previous grid resolution studies in terms of inundated area, depths, and velocity impacts. The results showed that as grid resolution is decreased, the relative fit of inundated area between the baseline and coarser resolution decreased slightly. This is further characterized by increasing over prediction as well as increasing under prediction with decreasing resolution. Comparison of average peak depths showed that depths generally decreased as resolution decreased, as well as the velocity. It is, however, noted that the trends in depth and velocity showed less consistency than the inundation area metrics. This may indicate that for studies in which velocity and depths must be resolved more accurately (urban environments when flow around buildings is important in the calculation of drag effects), higher resolution DEM data should be used. Perhaps the most significant finding from this study is the perceived insensitivity of socio-economic impacts to grid resolution. The difference in population at risk (PAR) and economic cost generally remained within 10% of the estimated impacts using the high resolution DEM. This insensitivity has been attributed to over estimated flood area and associated socio-economic impacts compensating for under estimated flooded area and associated socio-economic impacts. The United States has many dams that are classified as high-hazard potential that need an emergency action plan (EAP). It has been found that the development of EAPs for all high-hazard dams is handicapped due to funding limitations. The majority of the cost associated with developing an EAP is determining the flooded area. The results of this study have shown that coarse resolution dam breach studies can be used to provide an acceptable estimate of the inundated area and economic impacts, with very little computational cost. Therefore, the solution to limited funding may be to perform coarse resolution dam breach studies on high-hazard potential dams and use the results to help prioritize the order in which detailed EAPs should be developed.

Judi, David R [Los Alamos National Laboratory; Mcpherson, Timothy N [Los Alamos National Laboratory; Burian, Steven J [UNIV OF UTAH

2009-01-01T23:59:59.000Z

235

White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

2005-08-01T23:59:59.000Z

236

Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia  

SciTech Connect (OSTI)

The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

Pasha, MD Fayzul K [ORNL] [ORNL; Hadjerioua, Boualem [ORNL] [ORNL; Stewart, Kevin M [ORNL] [ORNL; Bender, Merlynn [Bureau of Reclamation] [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers] [U.S. Army Corps of Engineers

2012-01-01T23:59:59.000Z

237

Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse  

SciTech Connect (OSTI)

Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

2011-11-22T23:59:59.000Z

238

A young stellar environment for the superluminous supernova PTF12dam  

E-Print Network [OSTI]

The progenitors of super luminous supernovae (SLSNe) are still a mystery. Hydrogen-poor SLSN hosts are often highly star-forming dwarf galaxies and the majority belongs to the class of extreme emission line galaxies hosting young and highly star-forming stellar populations. Here we present a resolved long-slit study of the host of the hydrogen-poor SLSN PTF12dam probing the kpc environment of the SN site to determine the age of the progenitor. The galaxy is a "tadpole" with uniform properties and the SN occurred in a star-forming region in the head of the tadpole. The galaxy experienced a recent star-burst superimposed on an underlying old stellar population. We measure a very young stellar population at the SN site with an age of ~3 Myr and a metallicity of 12+log(O/H)=8.0 at the SN site but do not observe any WR features. The progenitor of PTF12dam must have been a massive star of at least 60 M_solar and one of the first stars exploding as a SN in this extremely young starburst.

Thöne, C C; García-Benito, R; Leloudas, G; Schulze, S; Amorín, R

2014-01-01T23:59:59.000Z

239

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Detroit Dam, 2011  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Detroit Dam (DET) on the North Santiam River, Oregon for the U.S. Army Corps of Engineers (USACE) to provide data to support decisions on long-term measures to enhance downstream passage at DET and others dams in USACE’s Willamette Valley Project. This study was conducted in response to regulatory requirements necessitated by the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. The goal of the study was to provide information of juvenile salmonid passage and distribution at DET from February 2011 through February 2012. The results of the hydroacoustic study provide new and, in some cases, first-ever data on passage estimates, run timing, distributions, and relationships between fish passage and environmental variables at the dam. This information will inform management decisions on the design and development of surface passage and collection devices to help restore Chinook salmon populations in the North Santiam River watershed above DET. During the entire study period, an estimated total of 182,526 smolt-size fish (±4,660 fish, 95% CI) passed through turbine penstock intakes. Run timing peaked in winter and early spring months. Passage rates were highest during late fall, winter and early spring months and low during summer. Horizontal distribution for hours when both turbine units were operated simultaneously indicated Unit 2 passed almost twice as much fish as Unit 1. Diel distribution for smolt-size fish during the study period was fairly uniform, indicating fish were passing the turbines at all times of the day. A total of 5,083 smolt-size fish (± 312 fish, 95% CI) were estimated passed via the spillway when it was open between June 23 and September 27, 2011. Daily passage was low at the spillway during the June-August period, and increased somewhat in September 2011. When the spillway was operated simultaneously with the turbines, spillway efficiency (efficiency is estimated as spillway passage divided by total project passage) was 0.72 and effectiveness (fish:flow ratio—proportion fish passage at a route (e.g., spillway) divided by proportion water through that route out of the total project) was 2.69. That is, when the spillway was open, 72% of the fish passing the dam used the spillway and 28% passed into the turbine penstocks. Diel distribution for smolt-size fish at the spillway shows a distinct peak in passage between mid-morning and mid-afternoon and low passage at night. We estimated that 23,339 smolt-size fish (± 572 fish, 95% CI) passed via the Regulating Outlet (RO) when it was open from October 29 through November 12, 2011, January 2-6, and January 20 through February 3, 2012. During the October–November period, RO passage peaked at 1,086 fish on November 5, with a second peak on November 7 (1,075 fish). When the RO was operated simultaneously with the turbines, RO efficiency was 0.33 and effectiveness was 0.89. In multiple regression analyses, a relatively parsimonious model was selected that predicted the observed fish passage data well. The best model included forebay temperature at depth, forebay elevation, total discharge, hours of daylight, and the operation period. The vertical distribution of fish in the forebay near the face of the dam where the transducers sampled showed fish were generally distributed throughout the water column during all four operational periods. During the refill and full pool periods, vertical distribution was bi-modal with surface-layer and mid-water modes. Patterns for day and night distributions were variable. Fish were distributed above and below the thermocline when it was present (full pool and drawdown periods).

Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Ham, Kenneth D.

2012-11-15T23:59:59.000Z

240

Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.  

SciTech Connect (OSTI)

Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.

Dunnigan, James; DeShazer, J.; Garrow, L.

2009-05-26T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013  

SciTech Connect (OSTI)

In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.

Harnish, Ryan A.; Colotelo, Alison HA; Li, Xinya; Ham, Kenneth D.; Deng, Zhiqun

2014-12-15T23:59:59.000Z

242

Figure 1. The wet area is flooded by damming up a small stream adjacent to the study area once a year for a period of 2-3 months. By  

E-Print Network [OSTI]

Figure 1. The wet area is flooded by damming up a small stream adjacent to the study area once. Figure 1.g The wet area is flooded by damming up a small streamded by damming up a smded by damwet area Vegetation data are obtained from two ri- parian grassland sites with strong hydro- logical gradients

Schierup, Mikkel Heide

243

final_report.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Scientific/Technical Report Final Scientific/Technical Report October 1, 2008 - December 31, 2011 Integrating Natural Gas Hydrates in the Global Carbon Cycle Submitted by: The University of Chicago 5801 S. Ellis Avenue Chicago, IL 60637 Principal Author: David Archer Prepared for: United States Department of Energy National Energy Technology Laboratory April 10, 2012 Office of Fossil Energy 1 Integrating Natural Gas Hydrates in the Global Carbon Cycle Final Scientific/Technical Report submitted by David Archer 1 and Bruce Buffett 2 Submitted 4-10-2012 1 Department of the Geophysical Sciences University of Chicago Chicago IL 60637 2 University of California, Berkeley Earth & Planetary Science 383 McCone Hall Berkeley, CA 94720-5800 Agency Award Number: DE-NT0006558 Award Dates 1/1/08 to 12/31/11

244

Assessment for Final Report  

E-Print Network [OSTI]

Community Tourism Assessment for Lindstrom, Minnesota Final Report May 2008 Prepared for of the University of Minnesota Extension and College of Food, Agricultural & Natural Resource Sciences #12; INTRODUCTION 1 DATA USED IN THE TOURISM ASSESSMENT 2 TOURISM-RELATED DATA FOR LINDSTROM 2 REFERENCES TO TOURISM

Amin, S. Massoud

245

Final Report Sustainability at  

E-Print Network [OSTI]

1 Final Report Sustainability at Oregon State University Prepared by The Institute for Natural Resources Oregon State University June 2009 #12;2 Sustainability at Oregon State University June 2009 The Institute for Natural Resources Created by the Oregon Legislature through the 2001 Oregon Sustainability Act

Escher, Christine

246

Final Technical Report  

SciTech Connect (OSTI)

The project, ?Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange? served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

Gilbert, Chris [Altamont Environmental, Inc.] [Altamont Environmental, Inc.

2014-11-13T23:59:59.000Z

247

SWERA_Final_Report  

Open Energy Info (EERE)

Ethiopian Rural Energy Development Ethiopian Rural Energy Development and Promotion Center Final Report Country background information Solar and Wind Energy Utilization and Project Development Scenarios October 2007 Ethio Resource Group with Partners i Table of Contents Executive Summary..................................................................................... ii 1 Introduction.........................................................................................................1-1 1.1 Overview.....................................................................................................1-1 1.2 Objective of the study .................................................................................1-1

248

Use of an autonomous sensor to evaluate the biological performance of the advanced turbine at Wanapum Dam  

DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973. Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission to replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Overall, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.

Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; Richmond, Marshall C.; Dauble, Dennis D.

2010-10-13T23:59:59.000Z

249

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River for the U.S. Army Corps of Engineers, Portland District (USACE), to provide data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACE's Willamette Valley Project. This study was conducted in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. We conducted a hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011. Findings from this 1 year of study should be applied carefully because annual variation can be expected due to variability in adult salmon escapement, egg-to-fry and fry-to-smolt survival rates, reservoir rearing and predation, dam operations, and weather. Fish passage rates for smolt-size fish (> {approx}90 mm and < 300 mm) were highest during December-January and lowest in mid-summer through early fall. Passage peaks were also evident in early spring, early summer, and late fall. During the entire study period, an estimated total of 142,463 fish {+-} 4,444 (95% confidence interval) smolt-size fish passed through turbine penstock intakes. Of this total, 84% passed during December-January. Run timing for small-size fish ({approx}65-90 mm) peaked (702 fish) on December 18. Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. Relatively few fish passed into the Regulating Outlets (ROs) when they were open in summer (2 fish/d) and winter (8 fish/d). Overall, when the ROs were open, RO efficiency (RO passage divided by total project passage) was 0.004. In linear regression analyses, daily fish passage (turbines and ROs combined) for smolt-size fish was significantly related to project discharge (P<0.001). This relationship was positive, but there was no relationship between total project passage and forebay elevation (P=0.48) or forebay elevation delta, i.e., day-to-day change in forebay elevation (P=0.16). In multiple regression analyses, a relatively parsimonious model was selected that predicted the observed data well. The multiple regression model indicates a positive trend between expected daily fish passage and each of the three variables in the model-Julian day, log(discharge), and log(abs(forebay delta)); i.e., as any of the environmental variables increase, expected daily fish passage increases. For vertical distribution of fish at the face of the dam, fish were surface-oriented with 62%-80% occurring above 10 m deep. The highest percentage of fish (30%-60%) was found between 5-10-m-deep. During spring and summer, mean target strengths for the analysis periods ranged from -44.2 to -42.1 dB. These values are indicative of yearling-sized juvenile salmon. In contrast, mean target strengths in fall and winter were about -49.0 dB, which are representative of subyearling-sized fish. The high-resolution spatial and temporal data reported herein provide detailed information about vertical, horizontal, diel, daily, and seasonal fish passage rates and distributions at LOP from March 2010 through January 2011. This information will support management decisions on design and development of surface passage and collection devices to help restore Chinook salmon populations in the Middle Fork Willamette River watershed above LOP.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

2012-05-31T23:59:59.000Z

250

An Assessment of Energy Potential at Non-Powered Dams in the United States  

SciTech Connect (OSTI)

fleet by 15%. A majority of this potential is concentrated in just 100 NPDs, which could contribute approximately 8 GW of clean, reliable hydropower; the top 10 facilities alone could add up to 3 GW of new hydropower. Eighty-one of the 100 top NPDs are U.S. Army Corps of Engineers (USACE) facilities, many of which, including all of the top 10, are navigation locks on the Ohio River, Mississippi River, Alabama River, and Arkansas River, as well as their major tributaries. This study also shows that dams owned by the U.S. Bureau of Reclamation hold the potential to add approximately 260 MW of capacity; the Bureau has also engaged in an effort to conduct a more detailed evaluation of its own facilities.

Hadjerioua, Boualem [ORNL; Wei, Yaxing [ORNL; Kao, Shih-Chieh [ORNL

2012-04-01T23:59:59.000Z

251

Evaluation of Fish Passage Conditions for Juvenile Salmonids Using Sensor Fish at Detroit Dam, Oregon  

SciTech Connect (OSTI)

Fish passage conditions through two spillways at Detroit Dam on the North Santiam River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions through Spillbay 3 and Spillbay 6 at 1.5- and 3.5-ft gate openings, identifying potential fish injury regions of the routes. The study was performed in July 2009, concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish and live fish were deployed at elevations approximately 3 ft above structure at depths determined using a computational fluid dynamics model. Data collected were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates.

Duncan, Joanne P.

2010-01-29T23:59:59.000Z

252

Billy Shaw Dam and Reservoir : Environmental Assessment and Finding of No Significant Impacts.  

SciTech Connect (OSTI)

This notice announces BPA`s decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir on the Duck Valley Reservation. This project is part of a continuing effort to address system-wide fish and wildlife losses caused by the development of the hydropower system in the Columbia River Basin. BPA has prepared an Environmental Assessment (EA) evaluating the potential environmental impacts of the proposed project. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

United States. Bonneville Power Administration; Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada.

1997-03-01T23:59:59.000Z

253

Lower Granite Dam Smolt Monitoring Program, 2004-2005 Annual Report.  

SciTech Connect (OSTI)

The 2004 fish collection season at Lower Granite Dam (LGR) was characterized by above average water temperatures, below average flows and spill, low levels of debris. The number of smolts collected for all species groups (with the exception of clipped and unclipped sockeye/kokanee) exceeded all previous collection numbers. With the continued release of unclipped supplementation chinook, steelhead and sockeye above LGR, we can not accurately distinguish wild chinook, wild steelhead and wild sockeye/kokanee from hatchery reared unclipped chinook and sockeye/kokanee in the sample. Wild steelhead can be identified from hatchery steelhead by the eroded dorsal and pectoral fins exhibited on unclipped hatchery steelhead. The numbers in the wild columns beginning in 1998 include wild and unclipped hatchery origin smolts. This season a total of 11,787,539 juvenile salmonids was collected at LGR. Of these, 11,253,837 were transported to release sites below Bonneville Dam, 11,164,132 by barge and 89,705 by truck. An additional 501,395 fish were bypassed to the river due to over-capacity of the raceways and for research purposes. According to the PTAGIS database, 177,009 PIT-tagged fish were detected at LGR in 2004. Of these, 105,894 (59.8%) were bypassed through the PIT-tag diversion system, 69,130 (39.1%) were diverted to the raceways to be transported, 1,640 (0.9%) were diverted to the sample tank, sampled and then transported, 345 (0.2%) were undetected at any of the bypass, raceway or sample exit monitors.

Mensik, Fred; Rapp, Shawn; Ross Doug (Washington Department of Fish and Wildlife, Olympia, WA)

2005-11-01T23:59:59.000Z

254

Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam  

SciTech Connect (OSTI)

At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

2009-01-29T23:59:59.000Z

255

Coupling glacial lake impact, dam breach, and flood processes: A modeling perspective  

Science Journals Connector (OSTI)

Abstract Glacial lake outburst floods (GLOFs) are highly mobile mixtures of water and sediment that occur suddenly and are capable of traveling tens to hundreds of kilometers with peak discharges and volumes several orders of magnitude larger than those of normal floods. They travel along existing river channels, in some instances into populated downstream regions, and thus pose a risk to people and infrastructure. Many recent events involve process chains, such as mass movements impacting glacial lakes and triggering dam breaches with subsequent outburst floods. A concern is that effects of climate change and associated increased instability of high mountain slopes may exacerbate such process chains and associated extreme flows. Modeling tools can be used to assess the hazard of potential future GLOFs, and process modeling can provide insights into complex processes that are difficult to observe in nature. A number of numerical models have been developed and applied to simulate different types of extreme flows, but such modeling faces challenges stemming from a lack of process understanding and difficulties in measuring extreme flows for calibration purposes. Here we review the state of knowledge of key aspects of modeling GLOFs, with a focus on process cascades. Analysis and simulation of the onset, propagation, and potential impact of \\{GLOFs\\} are based on illustrative case studies. Numerical models are presently available for simulating impact waves in lakes, dam failures, and flow propagation but have been used only to a limited extent for integrated simulations of process cascades. We present a spectrum of case studies from Patagonia, the European Alps, central Asia, and the Himalayas in which we simulate single processes and process chains of past and potential future events. We conclude that process understanding and process chain modeling need to be strengthened and that research efforts should focus on a more integrative treatment of processes in numerical models.

Raphael Worni; Christian Huggel; John J. Clague; Yvonne Schaub; Markus Stoffel

2014-01-01T23:59:59.000Z

256

EIS-0353: EPA Notice of Availability of the Final Environmental...  

Broader source: Energy.gov (indexed) [DOE]

the construction and operation of Hungry Horse Dam through restoring habitat, improving fish passage, protecting and recovering native fish populations, and reestablishing fish...

257

EA-0956: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. EA-0956-FEA-1995.pdf More Documents & Publications...

258

Final Scientific/Technical Report  

SciTech Connect (OSTI)

Final report for the formation of faculty and education establishing Colorado State's Smart Grid Integration Center

Troxell, W; Batchelor, A

2012-11-28T23:59:59.000Z

259

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... 4 Final Tank Closure and Waste Management Environmental Impact Statement (TC & WM EIS) (joint with PIC) ......

260

Physical characteristics of the performance and increase of the reliability of functioning of overflow dams with a {open_quotes}second limit state{close_quotes} of the rock foundation  

SciTech Connect (OSTI)

The main danger for the stability of high-head overflow dams having large safety factors is related to unfavorable processes in two zones of the foundation - near the upstream and downstream sides of the dam - due to fracturing of the rock foundation next to the dam by flood discharges. Fracturing of the toe of a dam, especially a gravity-arch dam, is accompanied by an increase of shear stresses in the rock under it to values exceeding the design values, and owing to fracturing of the rock below the dam foundation deformation movements of the dam toward the lower pool increase markedly, moreover, the greater amount, the more considerable the depth of fracturing below the dam foundation. As a result the tensile stresses in the rock in front of the dam increase to values exceeding the allowable, which intensifies cracking of this rock zone to a greater depth, the deeper the fracturing of the rock beyond the dam. Owing to this, the stress state of the foundation directly under the dam, accompanied by a decrease of the bearing capacity of the rock and increase of its deformation with loss of the required seepage strength, worsens.

Khlopenkov, P.R.

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

RPSEA Final Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RPSEA RPSEA Final Report 08122-36.Final Produced Water Pretreatment for Water Recovery and Salt Production 08122-36 January 26, 2012 Principal Investigator: James M. Silva Senior Chemical Engineer General Electric Global Research Center 1 Research Circle Niskayuna, NY 12309 ii Legal Notice This report was prepared by General Electric Global Research as an account of work sponsored by the Research Partnership to Secure Energy for America, RPSEA. Neither RPSEA, members of RPSEA, the National Energy Technology Laboratory, the U.S. Department of Energy, nor any person acting on behalf of any of the entities: a. MAKES ANY WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED WITH RESPECT TO ACCURACY, COMPLETENESS, OR USEFULNESS OF THE INFORMATION

262

Final Notice of Violation  

Broader source: Energy.gov (indexed) [DOE]

8,2011 8,2011 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Jolm J. Grossenbacher Director, Idaho National Laboratory and President, Battelle Energy Alliance, LLC P. O. Box 1625 Idaho Falls, Idaho 83415-3695 SEA-2011-01 Dear Mr. Grossenbacher: Pursuant to section 234B of the Atomic Energy Act of 1954, as amended, (the Act), and the Department of Energy's (DOE) regulations at 10 C.F.R . §§ 824.4(a)(3) and 824.7(b), DOE is issuing this Final Notice of Violation (FNOV) to Battelle Energy Alliance, LLC (BEA) for multiple violations of classified information security requirements. The FNOV is based upon the Office of Health, Safety and Security's Office of Enforcement May 11, 2010, Investigation Report and an evaluation of the evidence presented to DOE by BEA, including BEA's final

263

Final Design RM  

Broader source: Energy.gov (indexed) [DOE]

Final Design Review Module Final Design Review Module March 2010 CD-0 [This Rev Design Re O 0 view Module w eview of the OR OFFICE OF C CD-1 was used to dev R U 233 Dispo F ENVIRO Standard R Fin Rev Critical Decis CD-2 M velop the Revie osition Project ONMENTAL Review Plan al Design view Module sion (CD) Ap CD March 2010 ew Plan for 90% in 2009. Lesso Module.] L MANAGE n (SRP) n e pplicability D-3 % Design Revi ons learned hav EMENT CD-4 iew of SWPF i ve been incorpo Post Ope in 2008 and for orated in the R eration r 60% Review Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively.

264

Sage Final EA  

Broader source: Energy.gov (indexed) [DOE]

FINAL FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment for DEPARTMENT OF ENERGY LOAN GUARANTEE FOR SAGE ELECTROCHROMICS SAGEGLASS® HIGH VOLUME MANUFACTURING (HVM) FACILITY IN FARIBAULT, MN U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2009 DOE/EA-1645 Environmental Assessment for Department of Energy Loan Guarantee for Sage Electrochromics SageGlass® High Volume Manufacturing Facility in Faribault, MN DOE/EA-1645 TABLE OF CONTENTS LIST OF ACRONYMS iii Executive Summary 1 1.0 PURPOSE AND NEED FOR AGENCY ACTION 2 2.0 PROPOSED ACTION AND ALTERNATIVES 2 2.1 Description of Proposed Action 2 2.2 Alternatives Considered but Eliminated 7 2.3 No Action Alternative 8 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL EFFECTS 9

265

Final - Gasbuggy S  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gasbuggy S Gasbuggy S i t e Environmental Management End State Vision - January 2005 U.S. DEPARTMENT OF ENERGY Gasbuggy Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Gasbuggy Site Environmental Management End State Vhion - fanuaty 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public stakeholders, Tribal Nations). The end state document is not a decisional document. If the DOE decides to seek changes to the current compliance agreements, decisions, or statutoqdregulatory requirements, those changes will be made in accordance with applicable requirements (DOEIEM, 2003).

266

Final Technical Report  

SciTech Connect (OSTI)

The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

Maxwell, Mike, J., P.E.

2012-08-30T23:59:59.000Z

267

Sustainable energy Examen Final  

E-Print Network [OSTI]

Sustainable energy Examen Final 24 mai 2013 Consignes ­ Vous disposez de 2 heures 30. ­ N'oubliez pas de r´epondre `a chaque question sur des feuilles s´epar´ees et d'indiquer votre nom sur chaque feuille. ­ La r´eponse `a la question huit doit se faire en anglais et sur la derni`ere feuille de l

Ernst, Damien

268

Sustainable energy Examen Final  

E-Print Network [OSTI]

Sustainable energy Examen Final 30 mai 2014 Consignes -- Vous disposez de 2 heures 30. -- N'oubliez pas de r´epondre `a chaque question sur des feuilles s´epar´ees et d'indiquer votre nom, pr´enom et institution (ULg, Gramme) sur chaque feuille. -- Les r´eponses aux diff´erentes sous-questions doivent ^etre

Ernst, Damien

269

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2005 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2005 spring out-migration at migrant traps on the Snake River and Salmon River. In 2005 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, the age-1 and older fish were distinguishable from wild fish by the occurrence of fin erosion. Age-0 Chinook salmon are more difficult to distinguish between wild and non-adclipped hatchery fish and therefore classified as unknown rearing. The total annual hatchery spring/summer Chinook salmon catch at the Snake River trap was 0.34 times greater in 2005 than in 2004. The wild spring/summer Chinook catch was 0.34 times less than the previous year. Hatchery steelhead trout catch was 0.67 times less than in 2004. Wild steelhead trout catch was 0.72 times less than the previous year. The Snake River trap collected 1,152 age-0 Chinook salmon of unknown rearing. During 2005, the Snake River trap captured 219 hatchery and 44 wild/natural sockeye salmon and 110 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. Trap operations began on March 6 and were terminated on June 3. The trap was out of operation for a total of one day due to heavy debris. FPC requested that the trap be restarted on June 15 through June 22 to collect and PIT tag age-0 Chinook salmon. Hatchery Chinook salmon catch at the Salmon River trap was 1.06 times greater and wild Chinook salmon catch was 1.26 times greater than in 2004. The hatchery steelhead trout collection in 2005 was 1.41 times greater and wild steelhead trout collection was 1.27 times greater than the previous year. Trap operations began on March 6 and were terminated on May 17 due to high flows. There were two days when the trap was taken out of service because of mechanical failure. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for passive integrated transponder (PIT) tagged Chinook salmon and steelhead trout marked at the Snake River trap were affected by discharge. Statistical analysis of 2005 data detected a relation between migration rate and discharge for hatchery Chinook but was unable to detect a relation for wild Chinook. The inability to detect a migration rate discharge relation for wild Chinook salmon was caused by a lack of data. For hatchery Chinook salmon there was a 1.8-fold increase in migration rate between 50 and 100 kcfs. For steelhead trout tagged at the Snake River trap, statistical analysis detected a significant relation between migration rate and lower Granite Reservoir inflow discharge. For hatchery and wild steelhead trout, there was a 2.2-fold and a 2.2-fold increase in migration rate, respectively, between 50 and 100 kcfs. Travel time and migration rate to Lower Granite Dam for fish marked at the Salmon River trap were calculated. Statistical analysis of the 2005 data detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge for hatchery Chinook salmon, wild Chinook salmon, hatchery steelhead trout, and wild steelhead trout. Migration rate increased 4.2-fold for hatchery Chinook salmon, 2.9-fold for wild Chinook salmon and 2.5-fold for hatchery steelhead, and 1.7-fold for wild steelhead as discharge increased between 50 kcfs and 100 kcfs. Fish tagged with PIT tags at the Snake River and Salmon River traps were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993 and the installation of the Removable Spillway Weir at Lower Granite Dam in 2001, caution must be used in comparing cumulative interrogation data. Cumulative interrogations at the fo

Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

2009-02-18T23:59:59.000Z

270

Final Regulatory Impact Review/ Final Environmental Assessment/Initial Regulatory  

E-Print Network [OSTI]

Final Regulatory Impact Review/ Final Environmental Assessment/Initial Regulatory Flexibility................................................................................................. 1 2 REGULATORY IMPACT REVIEW................................................................. 2 2 Analysis Amendment 97 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands

271

Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

272

Accumulations Final Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interrelation of Global Climate and the Response of Oceanic Hydrate Interrelation of Global Climate and the Response of Oceanic Hydrate Accumulations Final Report Date: July 15, 2013 Period: October 1, 2008 - June 30, 2013 NETL Manager: Skip Pratt Principal Investigators: Matthew Reagan (LBNL), Philip W. Jones (LLNL) 1. Goal of this report This report will summarize previously reported or published results concerning the behavior of hydrates subjected to warming, highlighting contributing and mitigating factors relating to the possibility of rapid climate feedbacks. We will thus assess various scenarios and possibilities for the relationship between climate and hydrates: i.e., the likelihood of a "clathrate

273

Study of the comprehensive risk analysis of dam-break flooding based on the numerical simulation of flood routing. Part I: model development  

Science Journals Connector (OSTI)

Dam-break floods have been of increasing concern to safety ... of complex terrain in inundation areas multiplies the simulation difficulty of flood routing. In previous studies, representing the flood routing par...

Ruirui Sun; Xiaoling Wang; Zhengyin Zhou; Xuefei Ao; Xiaopei Sun…

2014-09-01T23:59:59.000Z

274

Study of the comprehensive risk analysis of dam-break flooding based on the numerical simulation of flood routing. Part II: Model application and results  

Science Journals Connector (OSTI)

The present model and methodology described in Part I of this work are applied to perform a comprehensive risk analysis of the dam-break flood of five reservoirs in the Haihe River ... The results indicate that t...

Zhengyin Zhou; Xiaoling Wang; Ruirui Sun; Xuefei Ao; Xiaopei Sun…

2014-06-01T23:59:59.000Z

275

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

2003-09-01T23:59:59.000Z

276

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2005-11-01T23:59:59.000Z

277

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O'Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

2003-01-01T23:59:59.000Z

278

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2006-02-01T23:59:59.000Z

279

Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2  

SciTech Connect (OSTI)

Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

2014-03-28T23:59:59.000Z

280

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.  

SciTech Connect (OSTI)

The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.

Crossley, Brian (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA); Lockwood, Jr., Neil W. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA)

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Lower Granite Dam Smolt Monitoring Program, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers between years, considering both annual river flows and annual project operations, because both affect fish migration and collection.

Mensik, Fred; Rapp, Shawn; Ross, Doug (Washington Department of Fish and Wildlife, Olympia, WA)

2007-01-01T23:59:59.000Z

282

Lower Granite Dam Smolt Monitoring Program, Annual Report 2005-2006.  

SciTech Connect (OSTI)

The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers between years, considering both annual river flows and annual project operations, because both affect fish migration and collection.

Menski, Fred

2007-01-01T23:59:59.000Z

283

Use of an Autonomous Sensor to Evaluate the Biological Performance of the Advanced Turbine at Wanapum Dam  

SciTech Connect (OSTI)

Hydropower is the largest renewable energy resource in the world and the United States. However, Hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydro turbines. In the Columbia and Snake River basins, dam operators and engineers are required to make these hydroelectric facilities more fish-friendly through changes in hydro-turbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon in the Endangered Species Act of 1973. Grant County Public Utility District (Grant PUD) requested authorization from the Federal Energy Regulatory Commission to replace the 10 turbines at Wanapum Dam with advanced hydropower turbines that are designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. The U.S. Department of Energy Office of Energy Efficiency and Renewable Energy provided co-funding to Grant PUD for aspects of performance testing that supported the application. As an additional measure to the primary evaluation measure of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device to provide insight into the specific hydraulic conditions or physical stresses that the fish experienced or the specific causes of the biological response. We found that the new blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by balloon tag-recapture tests. In addition, the new turbine provided a better pressure and rate of change environment for fish passage. Overall, the Sensor Fish data indicated that the advanced hydro turbine design met the desired fish passage goals for Wanapum Dam.

Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; Richmond, Marshall C.; Dauble, Dennis D.

2010-10-13T23:59:59.000Z

284

Placement of the dam for the no. 2 kambaratinskaya HPP by large-scale blasting: some observations  

SciTech Connect (OSTI)

Results of complex instrument observations of large-scale blasting during construction of the dam for the No. 2 Kambaratinskaya HPP on the Naryn River in the Republic of Kirgizia are analyzed. The purpose of these observations was: to determine the actual parameters of the seismic process, evaluate the effect of air and acoustic shock waves, and investigate the kinematics of the surface formed by the blast in its core region within the mass of fractured rocks.

Shuifer, M. I.; Argal, E. S. [JSC 'SPII Gidroproekt' (Russian Federation)

2011-11-15T23:59:59.000Z

285

Simulations of neutralized final focus  

E-Print Network [OSTI]

result of too little plasma density near focus where n b > nof a plasma- neutralized solenoidal final focus. A Ne+ beamto NDC, beam-plasma instability growth and final focus in a

Welch, D.R.; Rose, D.V.; Genoni, T.C.; Yu, S.S.; Barnard, J.J.

2005-01-01T23:59:59.000Z

286

Movements and Distribution of Northern Squawfish Downstream of Lower Snake River Dams Relative to the Migration of Juvenile Salmonids, 1992-1993 Completion Report.  

SciTech Connect (OSTI)

Northern squawfish Ptychocheilus oregonensis movements were monitored downstream of two lower Snake River dams during the juvenile salmonid migrations of 1992 and 1993. During a high flow year in 1993, the abundance of squawfish in the tailrace of Lower Granite Dam peaked in July, after the majority of juveniles had moved past Lower Granite Dam, and peak abundance was inversely related to river discharge. Few squawfish moved into the tailrace of Ice Harbor Dam in 1993 because of the extended period of spill. Distributions of squawfish in the tailrace of Lower Granite Dam varied between and within years and shifted in response to changing prey densities, flow patterns, water temperature, and diel cycles, but fish consistently used low velocity habitats. Data from Ice Harbor Dam is less extensive, but squawfish distributions there appeared to be affected by changing flow patterns and fish used low velocity habitats. The changes in distribution and abundance of squawfish in tailrace areas are evidence that predation on seaward migrating salmonids depends on the timing of migration and size and timing of runoff. Juvenile salmonids migrating in the spring and early summer will probably be less affected by squawfish predation in tailrace areas than salmon that migrate later in the summer.

Isaak, D.J.; Bjornn, T.C. (University of Idaho, Idaho Cooperative Fish and Wildlife Research Unit, Moscow, ID)

1996-03-01T23:59:59.000Z

287

NTSF Spring 2010 Final Agenda  

Broader source: Energy.gov [DOE]

Final Agenda for the U.S. Department of Energy's National Transportation Stakeholder Forum taking place in Chicago, Illinois.

288

Campus Climate Project Final Report  

E-Print Network [OSTI]

Campus Climate Project Final Report Oregon State University January 2005 #12;Rankin & Associates, Consulting OSU Campus Climate Assessment Project Final Report January 2005 1 Table of Contents Executive Campus Climate Assessment Project Final Report January 2005 i Executive Summary Resistance begins

Escher, Christine

289

FINAL TOUR ITINERARY 2oth NEBRASKAIRRIGATION TOUR  

E-Print Network [OSTI]

at Hamilton County Motor Inn, Aurora a.m. Travel back to I-80 and west to Hy 281 Exit off I-80 to Bosselman Status of Relicensing Efforts on Hydro-Electric Power Plants Operated by NPFD and CNPP&ID" Frank of Hydro-electric Generation Plant (20 minutes) Travel to top of K'ingsley Dam for Presentat

Nebraska-Lincoln, University of

290

NETL Final Report Outline  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Active and Passive Gas Imagers for Evaluation of Active and Passive Gas Imagers for Transmission Pipeline Remote Leak Detection Final Report December 2002 Submitted by Thomas A. Reichardt, Sanjay Devdas, and Thomas J. Kulp Diagnostics and Remote Sensing Department Sandia National Laboratories P.O. Box 969, MS 9056 Livermore, CA 94551 and Wayne Einfeld Environmental Monitoring and Characterization Department Sandia National Laboratories P.O. Box 5800, MS 0755 Albuquerque, NM 87185 This work was sponsored by The Strategic Center for Natural Gas Natural Gas Infrastructure Reliability Program, National Energy Technology Laboratory (NETL), DOE Office of Fossil Energy 2 Abstract The pipeline industry would benefit considerably from the development of systems that could provide early warning capabilities for major pipeline integrity and safety issues caused by leaks.

291

Final Report.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Selection and Treatment of Stripper Gas Wells for Selection and Treatment of Stripper Gas Wells for Production Enhancement, Mocane-Laverne Field, Oklahoma Final Report October, 2000 - September 30, 2003 Scott Reeves Advanced Resources International 9801 Westhemier, Suite 805 Houston, Texas 77042 and Buckley Walsh Oneok Resources 100 West Fifth Street Tulsa, OK 74103-0871 September, 2002 U.S. Department of Energy DE-FG26-00NT40789 i Disclaimers U.S. Department of Energy This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United Sates Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any

292

Final_Report.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy, Offi ce of Fossil Energy Technology International Inc.: Seismic While Drilling Project Naval Petroleum Reserve No. 3, Teapot Dome Field, Wyoming Final Report for the period of June 11-14, 2008 Completed February 2009 This document may contain protected Cooperative Research and Development Agreement (CRADA) information and is not to be further disclosed for a period of 5 years from the date it was produced except as expressly provided for in the CRADA. DISCLAIMER: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors or their employees, makes any warranty, expressed or implied,

293

Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

6E/EIS-0096-F . Ji^ ' 6E/EIS-0096-F . Ji^ ' w V' - > DOE/EIS--00 96-F-Vol.1 //C^ DE84 0 0 1 4 4 6 Final Environmental Impact Statement Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania United States Department of Energy July 1983 Volume I r NOTICE } IPORTIONS OF THIS REPORT ARE ILLEGIBLE.' / It has been reproduced from the besi ' available copy to permit the broadest possible availability. This document is PUBLICLY RELEASABLl Authorizmg OfFtciai Date: Z P l ^ o " ? isTWBUTim ef T H I S m\jM] IS mm\m DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal

294

NETL Final Report Outline  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sensor Evaluation for a Robotic In Line Inspection Vehicle for Sensor Evaluation for a Robotic In Line Inspection Vehicle for Detection of Natural Gas Pipeline Defects and Leaks Final Report February 2003 Submitted by Michael Hassard and Gerald Stoker Advanced Diagnostics and Production Testing Department Sandia National Laboratories P.O. Box 5800, MS 0555 And Mark Vaughn and Bob Bickerstaff Mobile Robotics Department Sandia National Laboratories P.O. Box 5800, MS1125 Albuquerque, NM 87185 This work was sponsored by The Strategic Center for Natural Gas Natural Gas Infrastructure Reliability Program, Natural Energy Technology Laboratory (NETL), DOE Office of Fossil Energy ABSTRACT When examining the condition of a pipeline, In-Line Inspection (ILI) utilizing various Non-Destructive Testing (NDT) methods is an essential tool and a significant factor in establishing a quality management

295

FINAL CEf VED  

Broader source: Energy.gov (indexed) [DOE]

DOElEA 1147 DOElEA 1147 FINAL CEf VED 6 I 3 I996 ENVIRONMENTAL ASSESSME ~ ~ O S T I for the LOW ENERGY DEMONSTRATION ACCELERATOR TECHNICAL AREA 53 LUS ALAMUS NATFUNAL LABORATORY LOS ALAMOS, NEW MEXICO . . - . - . I Date Prepared: April 1, 1996 ~ Prepared for: Office of Defense Programs US Department of Energy Los Alamos Area Q S c e DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any

296

AIPM Final Report  

SciTech Connect (OSTI)

The final AIPM project report consists of six sections. Each section includes information on the original AIPM project and extension work on the high temperature design. The first section (1) provides an overview of the program and highlights the significant targets to meet at the end of the program. The next section (2) summarizes the significant technical accomplishments by the SEMIKRON AIPM team during the course of the project. Greater technical details are provided in a collection of all the quarterly reports which can be found in the appendix. Section three (3) presents some the more significant technical data collected from technology demonstrators. Section four (4) analyzes the manufacturing cost or economic aspects of producing 100,000 units/yr. Section five (5) describes the commercialization efforts of the AIPM technology into the automotive market. The last section (6) recommends follow on work that will build on the efforts and achievements of the AIPM program.

John Mookken

2006-06-30T23:59:59.000Z

297

FINAL/ SCIENTIFIC TECHNICAL REPORT  

SciTech Connect (OSTI)

The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion America’s technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee – Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

McDonald, Henry; Singh, Suminderpal

2006-08-28T23:59:59.000Z

298

Final Scientific EFNUDAT Workshop  

ScienceCinema (OSTI)

The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

None

2011-10-06T23:59:59.000Z

299

NETL Final Report Outline  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Instrument for Airborne Remote Sensing of Transmission Instrument for Airborne Remote Sensing of Transmission Pipeline Leaks Final Report August 2004 Submitted by Thomas A. Reichardt, Sanjay Devdas, and Thomas J. Kulp Diagnostics and Remote Sensing Department Sandia National Laboratories P.O. Box 969, MS 9056 Livermore, CA 94551 and Wayne Einfeld Environmental Monitoring and Characterization Department Sandia National Laboratories P.O. Box 5800, MS 0755 Albuquerque, NM 87185 This work was sponsored by The Strategic Center for Natural Gas, Natural Gas Infrastructure Reliability Program, National Energy Technology Laboratory (NETL), DOE Office of Fossil Energy Abstract The pipeline industry would benefit considerably from the development of systems that could provide early warning capabilities for major pipeline integrity and safety issues indicated by

300

Clean Fleet Final Report  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

3 3 V e h i c l e M a i n t e n a n c e a n d D u r a b i l i t y FINAL REPORT December 1995 December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsor- ship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the research and/or experimental nature of this work, the District or Commission, Battelle, the sponsoring companies and associations, along with the employees, contractors, and subcontractors of each of them, make no warranties, expressed or implied, and they assume no legal liability for the information in this report. The District or

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Blackout Final Implementation Report  

Broader source: Energy.gov (indexed) [DOE]

Report Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors are listed in Annex 1. The staff wish to acknowledge the contributions of the U.S. Federal Energy Regulatory Commission and the Ontario Ministry of Energy. The staff also wish to acknowl- edge the support and cooperation of the North American Electric Reliability Council and, in particular, of Mr. David Nevius, Senior Vice President and Direc- tor of Reliability Assessment & Performance

302

Clean Fleet Final Report  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

2 2 P r o j e c t D e s i g n a n d I m p l e m e n t a t i o n FINAL REPORT December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsorship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the research and/or experimental nature of this work, the District or Commission, Battelle, the sponsoring companies and associations, along with the employees, contractors, and subcontractors of each of them, make no warranties, expressed or implied, and they assume no legal liability for the information in this report.

303

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2004 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2004 spring out-migration at migrant traps on the Snake River and Salmon River. In 2004 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 1.1 times greater in 2004 than in 2003. The wild Chinook catch was 1.1 times greater than the previous year. Hatchery steelhead trout catch was 1.2 times greater than in 2003. Wild steelhead trout catch was 1.6 times greater than the previous year. The Snake River trap collected 978 age-0 Chinook salmon of unknown rearing. During 2004, the Snake River trap captured 23 hatchery and 18 wild/natural sockeye salmon and 60 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. Trap operations began on March 7 and were terminated on June 4. The trap was out of operation for a total of zero days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 10.8% less and wild Chinook salmon catch was 19.0% less than in 2003. The hatchery steelhead trout collection in 2004 was 20.0% less and wild steelhead trout collection was 22.3% less than the previous year. Trap operations began on March 7 and were terminated on May 28 due to high flows. There were two days when the trap was taken out of service because wild Chinook catch was very low, hatchery Chinook catch was very high, and the weekly quota of PIT tagged hatchery Chinook had been met. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged Chinook salmon and steelhead trout marked at the Snake River trap were affected by discharge. Statistical analysis of 2004 data detected a relation between migration rate and discharge for wild Chinook salmon but was unable to detect a relation for hatchery Chinook. The inability to detect a migration rate discharge relation for hatchery Chinook salmon was caused by age-0 fall Chinook being mixed in with the age 1 Chinook. Age-0 fall Chinook migrate much slower than age-1 Chinook, which would confuse the ability to detect the migration rate discharge relation. When several groups, which consisted of significant numbers of age-0 Chinook salmon, were removed from the analysis a relation was detected. For hatchery and wild Chinook salmon there was a 2.8-fold and a 2.4-fold increase in migration rate, respectively, between 50 and 100 kcfs. For steelhead trout tagged at the Snake River trap, statistical analysis detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge. For hatchery and wild steelhead trout, there was a 2.3-fold and a 2.0-fold increase in migration rate, respectively, between 50 and 100 kcfs. Travel time and migration rate to Lower Granite Dam for fish marked at the Salmon River trap were calculated. Statistical analysis of the 2004 data detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge for hatchery Chinook salmon, wild Chinook salmon and hatchery steelhead trout. Not enough data were available to perform the analysis for wild steelhead trout. Migration rate increased 7.0-fold for hatchery Chinook salmon, 4.7-fold for wild Chinook salmon and 3.8-fold for hatchery steelhead as discharge increased between 50 kcfs and 100 kcfs. Fish tagged with passive integrated transponder (PIT) tags at the Snake River and Salmon River traps were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monume

Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

2009-02-18T23:59:59.000Z

304

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2002 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 2002 spring out-migration at migrant traps on the Snake River and Salmon River. In 2002 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 11.4 times greater in 2002 than in 2001. The wild Chinook catch was 15.5 times greater than the previous year. Hatchery steelhead trout catch was 2.9 times greater than in 2001. Wild steelhead trout catch was 2.8 times greater than the previous year. The Snake River trap collected 3,996 age-0 Chinook salmon of unknown rearing. During 2002, the Snake River trap captured 69 hatchery and 235 wild/natural sockeye salmon and 114 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant increase in catch in 2002 was due to a 3.1 fold increase in hatchery Chinook production and a more normal spring runoff. Trap operations began on March 10 and were terminated on June 7. The trap was out of operation for a total of four days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 4.2 times greater and wild Chinook salmon catch was 2.4 times greater than in 2001. The hatchery steelhead trout collection in 2002 was 81% of the 2001 numbers. Wild steelhead trout collection in 2002 was 81% of the previous year's catch. Trap operations began on March 10 and were terminated on May 29 due to high flows. The trap was out of operation for four days due to high flow or debris. The increase in hatchery Chinook catch in 2002 was due to a 3.1 fold increase in hatchery production and differences in flow between years. Changes in hatchery and wild steelhead catch are probably due to differences in flow between years. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged Chinook salmon and steelhead trout marked at the Snake River trap were affected by discharge. Statistical analysis of 2002 data detected a relation between migration rate and discharge for hatchery and wild Chinook salmon. For hatchery and wild Chinook salmon there was a 4.7-fold and a 3.7-fold increase in migration rate, respectively, between 50 and 100 kcfs. For steelhead trout tagged at the Snake River trap, statistical analysis detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge. For hatchery and wild steelhead trout, there was a 1.8-fold and a 1.7-fold increase in migration rate, respectively, between 50 and 100 kcfs. Travel time and migration rate to Lower Granite Dam for fish marked at the Salmon River trap were calculated. Statistical analysis of the 2002 data detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge for wild Chinook salmon and hatchery steelhead trout. The analysis was unable to detect a relation between migration rate and discharge for hatchery Chinook salmon. The lack of a detectable relation was probably a result of the migration rate data being spread over a very narrow range of discharge. Not enough data were available to perform the analysis for wild steelhead trout. Migration rate increased 4.3-fold for wild Chinook salmon and 2.2-fold for hatchery steelhead between 50 kcfs and 100 kcfs. Fish tagged with passive integrated transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993 and the installation of the Removable Spillway Weir at

Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

2009-02-18T23:59:59.000Z

305

Characterization of The Dalles Dam Spillbay 6 Vortex Using Surface Entrained Sensor Fish Device: Preliminary Report  

SciTech Connect (OSTI)

This document summarizes the pilot study to characterize The Dalles Dam Spillbay 6 vortex using a surface entrained Sensor Fish device. It was conducted by Pacific Northwest National Laboratory (PNNL) on April 13 and 14, 2006. The total spill was controlled at approximately 110 kcfs, the forebay elevation was 157.89 ft, and the discharge of Bay 6 at the tested gate opening of 14 ft was approximately 18 kcfs. The objectives of the full study are to (1) develop baseline conditions for the detailed analysis of Sensor Fish measurements by deploying Sensor Fish in different surface locations in the vortex periphery; (2) observe the entrainment pattern and extract hydraulic data of interest such as acceleration, rotation, pressure, and estimated velocity of Sensor Fish or drogues; (3) integrate the experimental results with companion computational fluid dynamics (CFD) simulations and inertial particle tracking studies. A total of 12 Sensor Fish were released in the surface at upstream edge, left edge, downstream edge, and the core of the vortex at Bay 6. Because of the high discharge, the vortex patterns at the test condition were less consistent than the patterns observed at lower discharges. Compared with the Sensor Fish released at mid-bay at Bay 6, Sensor Fish released from the surface at the vortex experienced higher pressure fluctuations, a larger percentage of severe events, and much more rapid angular velocities.

Deng, Zhiqun; Richmond, Marshall C.; Carlson, Thomas J.

2006-06-22T23:59:59.000Z

306

Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

1994-11-01T23:59:59.000Z

307

Final Report to DOE  

SciTech Connect (OSTI)

This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

Ismail Gultepe

2012-05-15T23:59:59.000Z

308

Final Technical Report  

SciTech Connect (OSTI)

This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental control business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.

Alexander Fridman

2005-06-01T23:59:59.000Z

309

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1998 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka, during the 1998 spring outmigration at migrant traps on the Snake and Salmon rivers. All hatchery chinook salmon released above Lower Granite Dam 19 1998 were marked with a fin-clip. Total annual hatchery chinook salmon catch at the Snake River trap was 226% of the 1997 number and 110% of the 1996 catch. The wild chinook catch was 120% of the 1997 catch but was only 93% of 1996. Hatchery steelhead trout catch was 501% of 1997 numbers but only 90% of the 1996 numbers. Wild steelhead trout catch was 569% of 1997 and 125% of the 1996 numbers. The Snake River trap collected 106 age-0 chinook salmon. During 1998, for the first time, the Snake River trap captured a significant number of hatchery sockeye salmon (1,552) and hatchery coho salmon O. kisutch (166). Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations began on March 8 and were terminated for the season due to high flows on June 12. The trap was out of operation for 34 d during the season due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 476% and wild chinook salmon catch was 137% of 1997 numbers and 175% and 82% of 1996 catch, respectively. The hatchery steelhead trout collection in 1998 was 96% of the 1997 catch and 13% of the 1996 numbers. Wild steelhead trout collection in 1998 was 170% of the 1997 catch and 37% of the 1996 numbers. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged chinook salmon and steelhead trout, marked at the head of the reservoir were affected by discharge. For fish tagged at the Snake River trap, statistical analysis of 1998 detected a significant relation between migration rate and discharge. For hatchery and wild chinook salmon there was a 2.0- and 2.6-fold increase in migration rate, respectively, between 50 and 100 thousands of cubic feet per second (kcfs). For hatchery steelhead trout there was a 2.6-fold increase in migration rate between 50 kcfs and 100 kcfs. For fish marked at the Salmon River trap, statistical analysis of the 1998 data detected a significant relation between migration rate and discharge for hatchery and wild chinook salmon hatchery and found a 3.3- and 2.6-fold increase in migration rate, respectively, between 50 and 100 kcfs. A significant relation between migration rate and discharge was not detected for hatchery steelhead trout. Insufficient numbers of wild steelhead trout were PIT-tagged at the Salmon River trap to estimate travel time and migration rate to Lower Granite Dam.

Buettner, Edwin W.; Brimmer, Arnold F.

2000-04-01T23:59:59.000Z

310

Development of nondestructive evaluation techniques for DAM inspection. Progress report, January 1995 through August 1997  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory has concluded a two and a half year study on the development of an ultrasonic inspection system to inspect post stressed steel tendons on dams and flood gates. The inspection systems were part of a program for the California Department of Water Resources. The effort included the identification of the location and amount of corrosion damage to the tendons, identification of the cause of corrosion, and the technology for inhibiting corrosion. Several NDE methods for inspecting and quantifying damage to steel reinforced concrete water pipes were investigated and presented to the DWR for their consideration. The additional methods included Ground Penetrating RADAR, Electro- Potential Measurements, Infrared Technology, Pipe Inspection Crawlers (designed to travel inside pipelines and simultaneously report on the pipe condition as viewed by ultrasonic methods and video cameras from within the pipeline.) Reference to consultants hired by LLNL for similar on-site corrosion inspections were given to the DWR. The LLNL research into industries that have products to prevent corrosion resulted in the identification of an Innsbruck, Austria, company. This company claims to have products to permanently protect post- or pre-stressed tendons. The caveat is that the tendon protection system must be installed when the tendons are installed because no retrofit is available. Corrosion mitigation on the steel reinforcements surrounding the concrete was addressed through active and passive cathodic protection schemes. The combination of corrosion and erosion were addressed during consideration for the inspection of water-pump impeller-blades that are used in the three stage, million horsepower, pumping stations at Edmunston.

Brown, A. E.; Thomas, G.H.

1997-09-04T23:59:59.000Z

311

Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.  

SciTech Connect (OSTI)

From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emergence timing estimates and evaluations of redd dewatering.

Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju [Pacific Northwest National Laboratory

2008-08-08T23:59:59.000Z

312

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1997 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1997 spring out-migration at migrant traps on the Snake River and Salmon River. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1997. Total annual hatchery chinook salmon catch at the Snake River trap was 49% of the 1996 number but only 6% of the 1995 catch. The wild chinook catch was 77% of the 1996 but was only 13% of 1995. Hatchery steelhead trout catch was 18% of 1996 numbers but only 7% of the 1995 numbers. Wild steelhead trout catch was 22% of 1996 but only 11% of the 1995 numbers. The Snake River trap collected eight age-0 chinook salmon and one sockeye/kokanee salmon O. nerka. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations were terminated for the season due to high flows and trap damage on May 8 and were out of operation for 23 d due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 37% and wild chinook salmon catch was 60% of 1996 numbers but only 5% and 11% of 1995 catch, respectively. The 1997 hatchery steelhead trout collection was 13% of the 1996 catch and 32% of the 1995 numbers. Wild steelhead trout collection in 1997 was 21% of the 1996 catch and 13% of the 1995 numbers. Trap operations were terminated for the season due to high flows and trap damage on May 7 and were out of operation for 19 d due to high flow and debris.

Buettner, Edwin W.; Nelson, William R.

1999-04-01T23:59:59.000Z

313

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1999 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 1999 spring out-migration at migrant traps on the Snake River and Salmon River. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1999. Total annual hatchery chinook salmon catch at the Snake River trap was 440% of the 1998 number. The wild chinook catch was 603% of the previous year's catch. Hatchery steelhead trout catch was 93% of 1998 numbers. Wild steelhead trout catch was 68% of 1998 numbers. The Snake River trap collected 62 age-0 chinook salmon. During 1998 the Snake River trap captured 173 hatchery and 37 wild/natural sockeye salmon and 130 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations began on March 14 and were terminated for the season due to high flows on May 25. The trap was out of operation for 18 d during the season due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 214%, and wild chinook salmon catch was 384% of 1998 numbers. The hatchery steelhead trout collection in 1999 was 210% of the 1998 numbers. Wild steelhead trout collection in 1999 was 203% of the 1998 catch. Trap operations began on March 14 and were terminated for the season due to high flows on May 21. The trap was out of operation for 17 d during the season due to high flow and debris.

Buettner, Edwin W.; Brimmer, Arnold F.; Putnam, Scott A.

2001-06-01T23:59:59.000Z

314

CCSTF - Final Report | Department of Energy  

Office of Environmental Management (EM)

CCSTF - Final Report CCSTF - Final Report Carbon Capture and Storage Task Force - Final Report More Documents & Publications Before the Subcommittee on Energy -- House Science,...

315

Final Report to the U  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gas Hydrate Markup Language Final Report Gas Hydrate Markup Language Final Report Development of a Gas Hydrate Markup Language Final Report Prepared By: E. Dendy Sloan, Director and Weaver Chair Center for Hydrate Research Colorado School of Mines Golden, Colorado 80401 esloan@mines.edu For: U.S. Department of Energy National Energy Technology Laboratory Under Contract DE-AF26-067Nt00440 Development of a Gas Hydrate Markup Language Final Report Table of Contents Preface............................................................................................................................................. 2 1.0 Introduction......................................................................................................................... 3 1.1 OBJECTIVES OF THE DATABASE AND GHML DEVELOPMENT EFFORT

316

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 5, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATION COMMITTEE June 5, 2013 Richland, WA Topics in this Meeting Summary Opening...

317

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 11, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE October 11, 2012 Richland, WA Topics in this Meeting Summary...

318

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

August 9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening...

319

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE October 7, 2014 Richland, WA Topics in this Meeting Summary Opening ......

320

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

March 5, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITEE March 5, 2014 Kennewick, WA Topics in this Meeting Summary Welcome and Introduction...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 3, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITTEE September 3, 2014 Pasco, WA Topics in this Meeting Summary Welcome ......

322

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 8, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE October 8, 2014 Richland, WA Topics in this Meeting Summary Opening ......

323

LIVE_NSB_final.wmv  

ScienceCinema (OSTI)

National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

None

2010-09-01T23:59:59.000Z

324

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

March 6, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 6, 2013 Richland, WA Topics in this Meeting Summary Opening ......

325

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

meeting (May), but to meet Ecology's submittal timeline, the committee agreed to review the summary and adopt it via email. Ecology will include the final meeting summary...

326

Microsoft Word - AFD FWPO Final EA 11-01-11.docx  

Broader source: Energy.gov (indexed) [DOE]

B B Historical Winter Elevations of Lake Pend Oreille U.S. Army Corps of Engineers and Bonneville Power Administration B-1 Figure B-1. Winter Elevation of Lake Pend Oreille, Water Years 1960-1969 (Water Year is from October 1 to September 30. Red lines denote the FWPO operating range.) B-2 Albeni Falls Dam Flexible Winter Power Operations Final Environmental Assessment Figure B-2. Winter Elevation of Lake Pend Oreille, Water Years 1970-1979 (Water year is from October 1 to September 30. Red lines denote the FWPO operating range.) U.S. Army Corps of Engineers and Bonneville Power Administration B-3 Figure B-3. Winter Elevation of Lake Pend Oreille, Water Years 1980-1989 (Water year is from October 1 to September 30. Red lines denote FWPO operating range.)

327

ASEDRA Evaluation Final Report.  

SciTech Connect (OSTI)

The performance of the Advanced Synthetically Enhanced Detector Resolution Algorithm (ASEDRA) was evaluated by performing a blind test of 29 sets of gamma-ray spectra that were provided by DNDO. ASEDRA is a post-processing algorithm developed at the Florida Institute of Nuclear Detection and Security at the University of Florida (UF/FINDS) that extracts char-acteristic peaks in gamma-ray spectra. The QuickID algorithm, also developed at UF/FINDS, was then used to identify nuclides based on the characteristic peaks generated by ASEDRA that are inferred from the spectra. The ASEDRA/QuickID analysis results were evaluated with respect to the performance of the DHSIsotopeID algorithm, which is a mature analysis tool that is part of the Gamma Detector Response and Analysis Software (GADRAS). Data that were used for the blind test were intended to be challenging, and the radiation sources included thick shields around the radioactive materials as well as cargo containing naturally occurring radio-active materials, which masked emission from special nuclear materials and industrial isotopes. Evaluation of the analysis results with respect to the ground truth information (which was provided after the analyses were finalized) showed that neither ASEDRA/QuickID nor GADRAS could identify all of the radiation sources correctly. Overall, the purpose of this effort was primarily to evaluate ASEDRA, and GADRAS was used as a standard against which ASEDRA was compared. Although GADRAS was somewhat more accurate on average, the performance of ASEDRA exceeded that of GADRAS for some of the unknowns. The fact that GADRAS also failed to identify many of the radiation sources attests to the difficulty of analyzing the blind-test data that were used as a basis for the evaluation. This evaluation identified strengths and weaknesses of the two analysis approaches. The importance of good calibration data was also clear because the performance of both analysis methods was impeded by the inability to define the energy calibration accurately. Acronyms ACHIP adaptive chi-processed ASEDRA Advanced Synthetically Enhanced Detector Resolution Algorithm DNDO Domestic Nuclear Detection Office DRFs Detector Response Functions FINDS Florida Institute of Nuclear Detection and Security FWHM full-width half-maximum GADRAS Gamma Detector Response Analysis Software GUI graphical user interface HEU highly enriched uranium HPGe high purity germanium ID identification NaI Sodium iodide NNSA National Nuclear Security Administration NORM Naturally Occurring Radioactive Materials ppm parts per million SNL Sandia National Laboratories UF University of Florida WGPu weapons-grade plutonium

Mitchell, Dean James; Detwiler, Dr. Rebecca; Sjoden, Dr, Glenn E.

2008-09-01T23:59:59.000Z

328

Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the proposed repair of the Pond B dam at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

N /A

1999-09-27T23:59:59.000Z

329

Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume One, Libby Dam Project, Operator, U.S. Army Corps of Engineers.  

SciTech Connect (OSTI)

This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Libby Dam project on the Kootenai River and previous mitigation of these losses. The current assessment documents the best available information concerning the impacts to the wildlife populations inhabiting the project area prior to construction of the dam and creation of the reservoir. Many of the impacts reported in this assessment differ from those contained in the earlier document compiled by the Fish and Wildlife Service; however, this document is a thorough compilation of the available data (habitat and wildlife) and, though conservative, attempts to realistically assess the impacts related to the Libby Dam project. Where appropriate the impacts resulting from highway construction and railroad relocation were included in the assessment. This was consistent with the previous assessments.

Yde, Chris A.

1984-10-01T23:59:59.000Z

330

Effects of exposure of rat dams to 1-bromopropane during pregnancy and lactation on growth and sexual maturation of their offspring  

Science Journals Connector (OSTI)

1-Bromopropane (1-BP) exhibits neuroreproductive toxicities in adult rats and humans. Here, we determined the effects of exposure of rat dams to 1-BP during pregnancy and lactation on the growth and sexual maturation of their offspring. In Experiment 1, 40 rats were exposed to 0, 100, 400 and 800 ppm 1-BP during pregnancy and lactation for 8 h/day. Ten rats that were not placed in chambers throughout the experiment served to observe the effect of separation of dams from offspring. In Experiment 2, three groups of 10 pregnant rats each were exposed to fresh air in three chambers and 10 other rats were exposed to 800 ppm 1-BP during pregnancy and lactation for 8 h/day. After delivery, offspring of the exposed and non-exposed dams were swapped so that they were nursed by the opposite dams. In Experiment 1, the survival rate and body weight of offspring were lower than the non-exposed in 1-BP dose-dependent manner. In Experiment 2, the survival rate and body weight of offspring (Group A) nursed by exposed dams and those (Group B) of exposed dams were significantly lower than non-exposed groups. The body weight of Group A was lower than that of Group B, although the two groups showed a significant equal decrease in the survival rate. The number of dead offspring from Group A was significantly higher. Our results indicate that exposure to 1-BP during pregnancy and lactation has comparable effects on survival rate, but exposure during lactation has a more adverse effect on growth of offspring than that during pregnancy. Moreover, exposure during lactation is associated with reduced early survival of third generation (F2) rats.

Koichi Furuhashi; Junzoh Kitoh; Hiroko Tsukamura; Kei-ichiro Maeda; Hailan Wang; Weihua Li; Sahoko Ichihara; Tamie Nakajima; Gaku Ichihara

2006-01-01T23:59:59.000Z

331

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

2002-02-01T23:59:59.000Z

332

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2003 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2003 spring out-migration at migrant traps on the Snake River and Salmon River. In 2003 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 2.1 times less in 2003 than in 2002. The wild Chinook catch was 1.1 times less than the previous year. Hatchery steelhead trout catch was 1.7 times less than in 2002. Wild steelhead trout catch was 2.1 times less than the previous year. The Snake River trap collected 579 age-0 Chinook salmon of unknown rearing. During 2003, the Snake River trap captured five hatchery and 13 wild/natural sockeye salmon and 36 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant differences in catch between 2003 and the previous year were due mainly to low flows during much of the trapping season and then very high flows at the end of the season, which terminated the trapping season 12 days earlier than in 2002. Trap operations began on March 9 and were terminated on May 27. The trap was out of operation for a total of zero days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 16.8% less and wild Chinook salmon catch was 1.7 times greater than in 2002. The hatchery steelhead trout collection in 2003 was 5.6% less than in 2002. Wild steelhead trout collection was 19.2% less than the previous year. Trap operations began on March 9 and were terminated on May 24 due to high flows. There were zero days when the trap was out of operation due to high flow or debris. The decrease in hatchery Chinook catch in 2003 was partially due to differences in flow between years because there was a 5.9% increase in hatchery production in the Salmon River drainage in 2003. The decrease in hatchery steelhead catch may be partially due to a 13% decrease in hatchery production in the Salmon River drainage in 2003. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged Chinook salmon and steelhead trout marked at the Snake River trap were affected by discharge. Statistical analysis of 2003 data detected a relation between migration rate and discharge for wild Chinook salmon but was unable to detect a relation for hatchery Chinook. The inability to detect a migration rate discharge relation for hatchery Chinook was probably caused by age 0 fall Chinook being mixed in with the age 1 Chinook. Age 0 fall Chinook migrate much slower than age 1 Chinook, which would confuse the ability to detect the migration rate discharge relation. For wild Chinook salmon there was a 1.4-fold increase in migration rate, respectively, between 50 and 100 kcfs. For steelhead trout tagged at the Snake River trap, statistical analysis detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge. For hatchery and wild steelhead trout, there was a 1.7-fold and a 1.9-fold increase in migration rate, respectively, between 50 and 100 kcfs. Travel time and migration rate to Lower Granite Dam for fish marked at the Salmon River trap were calculated. Statistical analysis of the 2003 data detected a significant relation between migration rate and Lower Granite Reservoir inflow discharge for hatchery Chinook salmon, wild Chinook salmon and hatchery steelhead trout. Not enough data were available to perform the analysis for wild steelhead trout. Migration rate increased 14-fold for hatchery Chinook salmon, 8.3-fold for wild Chinook salmon and 2.4-fold for hatchery steelhead as discharge increased between 50 kcfs and

Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

2009-02-18T23:59:59.000Z

333

Phase I Final Technical Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Report to Final Report to Phase I Final Technical Report 10121.4302.01.Final1 Ultra-High Conductivity Umbilicals: Polymer Nanotube Umbilicals (PNUs) 10121-4302-01 June 24, 2013 Christopher A. Dyke Principal Investigator NanoRidge Materials, Inc. 15850 Vickery Drive Houston, Texas 77032 LEGAL NOTICE THIS REPORT WAS PREPARED BY NANORIDGE MATERIALS, INC. AS AN ACCOUNT OF WORK SPONSORED BY THE RESEARCH PARTNERSHIP TO SECURE ENERGY FOR AMERICA, RPSEA. NEITHER RPSEA MEMBERS OF RPSEA, THE NATIONAL ENERGY TECHNOLOGY LABORATORY, THE U.S. DEPARTMENT OF ENERGY, NOR ANY PERSON ACTING ON BEHALF OF ANY OF THE ENTITIES: a. MAKES ANY WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED WITH RESPECT TO ACCURACY, COMPLETENESS, OR USEFULNESS OF THE INFORMATION

334

Danish Energy Authority Final report  

E-Print Network [OSTI]

1 Danish Energy Authority Final report Kaliningrad Regional District Heating Network 2004 - 2006 2006 #12;Kaliningrad District Heating Network Project 2004 - 2006 2 Table of content The report........................................................................................................... 7 1.4.1 District heating in the Region

335

Final Report: Axion "Roadmap" Workshop  

SciTech Connect (OSTI)

Final report for "Vistas in Axion Physics: A Roadmap for Theoretical and Experimental Axion Physics through 2025", which was held at the University of Washington, INT, from April 23 - 26, 2012.

Rosenberg, Leslie J

2013-03-19T23:59:59.000Z

336

Reactor physics project final report  

E-Print Network [OSTI]

This is the final report in an experimental and theoretical program to develop and apply single- and few-element methods for the determination of reactor lattice parameters. The period covered by the report is January 1, ...

Driscoll, Michael J.

1970-01-01T23:59:59.000Z

337

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that all summaries are posted to the HAB website once finalized and HAB members can review draft summaries on the SharePoint site. Announcements Liz said a public meeting was...

338

Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement  

SciTech Connect (OSTI)

This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

Not Available

1993-11-01T23:59:59.000Z

339

Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam Turbines, Early Spring 2011  

SciTech Connect (OSTI)

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam turbines during early spring 2011. The study was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE) to investigate whether adult steelhead are passing through turbines during early spring before annual sluiceway operations typically begin. The sluiceway surface flow outlet is the optimal non-turbine route for adult steelhead, although operating the sluiceway reduces hydropower production. This is a follow-up study to similar studies of adult steelhead passage at the sluiceway and turbines we conducted in the fall/winter 2008, early spring 2009, fall/winter 2009, and early spring 2010. The goal of the 2011 study was to characterize adult steelhead passage rates at the turbines while the sluiceway was closed so fisheries managers would have additional information to use in decision-making relative to sluiceway operations. Sluiceway operations were not scheduled to begin until April 10, 2011. However, based on a management decision in late February, sluiceway operations commenced on March 1, 2011. Therefore, this study provided estimates of fish passage rates through the turbines, and not the sluiceway, while the sluiceway was open. The study period was March 1 through April 10, 2011 (41 days total). The study objective was to estimate the number and distribution of adult steelhead and kelt-sized targets passing into turbine units. We obtained fish passage data using fixed-location hydroacoustics with transducers deployed at all 22 main turbine units at The Dalles Dam. Adult steelhead passage through the turbines occurred on 9 days during the study (March 9, 12, 30, and 31 and April 2, 3, 5, 7, and 9). We estimated a total of 215 {+-} 98 (95% confidence interval) adult steelhead targets passed through the turbines between March 1 and April 10, 2011. Horizontal distribution data indicated Main Unit 18 passed the majority of fish. Fish passage occurred throughout the day. We conclude that adult steelhead passed through turbines during early spring 2011 at The Dalles Dam.

Khan, Fenton; Royer, Ida M.

2012-02-01T23:59:59.000Z

340

MACCS2 Final Gap Analysis  

Broader source: Energy.gov (indexed) [DOE]

MACCS2-Gap Analysis MACCS2-Gap Analysis Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.3: Software Quality Assurance Improvement Plan: MACCS2 Gap Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 May 2004 MACCS2 Gap Analysis May 2004 Final Report INTENTIONALLY BLANK ii MACCS2 Gap Analysis May 2004 Final Report FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the radiological dispersion computer code, MACCS2, relative to established software requirements. This evaluation, a "gap analysis", is performed to meet commitment 4.2.1.3 of the

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EPA Final Ground Water Rule  

Broader source: Energy.gov (indexed) [DOE]

Office of Nuclear Safety and Environment Office of Nuclear Safety and Environment Nuclear Safety and Environment Information Brief HS-20-IB-2007-02 (March 2007) EPA Final Ground Water Rule Safe Drinking Water Act: National Primary Drinking Water Regulations Ground Water Rule - 40 CFR Parts 9, 141 and 142 Final Rule: 71 FR 65574 Effective Date: January 8, 2007 1 RULE SYNOPSIS On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in public water systems (PWSs) that use ground water sources for their supply (these systems are known as ground water systems). This Rule establishes a risk-targeted approach

342

MPO B593110 - Final Report  

SciTech Connect (OSTI)

National Security Technologies, LLC (NSTec) shall provide one (1) Mechanical Engineer to support the Linear Collider Subsystem Development Program at Lawrence Livermore National Security, LLC (LLNS). The NSTec Mechanical Engineer's efforts will include engineering, design, and drawing support for the Vacuum Seal Test. NSTec will also provide a final report of the setup and input to LLNL's project management on project status. The NSTec Mechanical Engineer's efforts will also include engineering, design, and drawing support to the conceptual design for manufacturing of the Flux Concentrator Magnet. NSTec will also contribute to LLNS's final report on the Flux Concentrator Magnet. The deliverables are drawings, sketches, engineering documents, and final reports delivered to the LLNS Technical Representative.

Brooksby, C

2011-07-25T23:59:59.000Z

343

FinalProgramReportfinal.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

November 8, 2004 November 8, 2004 Paul Wambach EH-53/270 Corporate Square Building U. S. Department of Energy 1000 Independence Avenue, SW Germantown, MD 20585-0270 CONTRACT NO. DE-AC05-00OR22750: FY04 FINAL REPORT FOR THE FORMER RADIATION WORKER MEDICAL SURVEILLANCE PROGRAM AT ROCKY FLATS The enclosed subject final report prepared by Joe M. Aldrich is submitted as stated in the Fiscal Year 2004 Field Work Proposal for the Former Radiation Worker Medical Surveillance Program at Rocky Flats. This is the final report for this program. If you have any questions, please contact me at (303) 423-9585, ext. 238 or Joe M. Aldrich at (303) 423- 9585, ext. 227. Sincerely, Duane E. Hilmas, D.V.M., Ph.D. Technical Director Enclosure cc: Donna Cragle Robert Bistline

344

Final Design RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Design RM Final Design RM The Final Design (FD) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the technical...

345

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2007 Annual Report.  

SciTech Connect (OSTI)

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.

Garcia, A.P.; Bradbury, S. [U.S. Fish and Wildlife Service; Arnsberg, B.D. [Nez Perce Tribe; Groves, P.A. [Idaho Power Company

2008-11-25T23:59:59.000Z

346

Re-Analysis of Hydroacoustic Fish-Passage Data from Bonneville Dam after Spill-Discharge Corrections  

SciTech Connect (OSTI)

The U.S. Army Corps of Engineers - Portland District asked Pacific Northwest National Laboratory to re-analyze four years of fixed-aspect hydroacoustic data after the District made adjustments to spill discharge estimates. In this report, we present new estimates of all major fish-passage metrics for study years 2000, 2001, 2002, and 2004, as well as estimates for 2005. This study supports the Portland District and its effort to maximize survival of juvenile salmon passing Bonneville Dam. Major passage routes through Bonneville Dam include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines at Powerhouse 2 (B2) and a sluiceway including the B2 Corner Collector. The original reports and all associated results, discussion, and conclusions for non flow-related metrics remain valid and useful, but effectiveness measures for study years 2000, 2001, 2002, and 2004 as reported in previous reports by Ploskey et al. should be superseded with the new estimates reported here. The fish-passage metrics that changed the most were related to effectiveness. Re-analysis produced spill effectiveness estimates that ranged from 12% to 21% higher than previous estimates in spring and 16.7% to 27.5% higher in summer, but the mean spill effectiveness over all years was only slightly above 1:1 (1.17 for spring and 1.29 for summer). Conversely surface-passage effectiveness decreased in the years this metric was measured (by 10.1% in spring and 10.7% in summer of 2002 and 9.5% in spring and 10.2% in summer of 2004). The smallest changes in the re-analysis were in project fish passage efficiency (0%-1%) and spill efficiency (0.9%-3.0%).

Ploskey, Gene R.; Kim, Jina; Weiland, Mark A.; Hughes, James S.; Fischer, Eric S.

2007-06-07T23:59:59.000Z

347

SciTech Connect: Final Report  

Office of Scientific and Technical Information (OSTI)

Search Title: Final Report Final Report We propose to extend the technique of polarized neutron scattering into new domains by continued development and application of polarized...

348

Ocean Thermal Extractable Energy Visualization: Final Technical...  

Office of Environmental Management (EM)

Ocean Thermal Extractable Energy Visualization: Final Technical Report Ocean Thermal Extractable Energy Visualization: Final Technical Report Report about the Ocean Thermal...

349

EIS-0161: Final Programmatic Environmental Impact Statement ...  

Broader source: Energy.gov (indexed) [DOE]

61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain...

350

ERDA-1537: Final Environmental Impact Statement | Department...  

Broader source: Energy.gov (indexed) [DOE]

ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on...

351

Survival of Subyearling Fall Chinook Salmon in the Free-flowing Snake River and Lower Snake River Reservoirs in 2003 and from McNary Dam Tailrace to John Day Dam Tailrace in the Columbia River from 1999 to 2002, 1999-2003 Technical Report.  

SciTech Connect (OSTI)

We report results from an ongoing study of survival and travel time of subyearling fall Chinook salmon in the Snake River during 2003 and in the Columbia River during 1999-2002. Earlier years of the study included serial releases of PIT-tagged hatchery subyearling Chinook salmon upstream from Lower Granite Dam, but these were discontinued in 2003. Instead, we estimated survival from a large number of PIT-tagged fish released upstream from Lower Granite Dam to evaluate transportation from Snake River Dams. During late May and early June 2003, 68,572 hatchery-reared subyearling fall Chinook salmon were PIT tagged at Lyons Ferry Hatchery, trucked upstream, acclimated, and released at Couse Creek and Pittsburg Landing in the free-flowing Snake River. We estimated survival for these fish from release to Lower Granite Dam tailrace. In comparison to wild subyearling fall Chinook salmon PIT tagged and released in the free-flowing Snake River, the hatchery fish we released traveled faster and had higher survival to Lower Granite Dam, likely because of their larger size at release. For fish left in the river to migrate we estimated survival from Lower Granite Dam tailrace to McNary Dam tailrace. Each year, a small proportion of fish released are not detected until the following spring. However, the number of fish released in 2003 that overwintered in the river and were detected as they migrated seaward as yearlings in 2004 was small (<1.0%) and had minimal effect on survival estimates. We evaluated a prototype floating PIT-tag detector deployed upstream from Lower Granite reservoir to collect data for use in partitioning travel time and survival between free-flowing and reservoir habitats. The floating detector performed poorly, detecting only 27 PIT tags in 340 h of operation from a targeted release of 68,572; far too few to partition travel time and survival between habitats. We collected river-run subyearling Chinook salmon (mostly wild fish from the Hanford Reach) at McNary Dam, PIT tagged them, and released them to the tailrace as part of an evaluation of transportation from McNary Dam in 2002. Estimated survival in 2002 from the tailrace of McNary Dam to the tailrace of John Day Dam was 0.746 (s.e. 0.036). For migration years 1999-2002, we found that in the reach from McNary to John Day Dam reach, travel time was shorter (migration rate was greater) and survival probabilities were greater when flow volume was greater. Survival was also correlated with water temperature: warmer water was associated with decreased survival, and there was an apparent survival threshold at about 19.3 C (above this temperature survival decreased substantially).

Muir, William D.; Axel, Gordon A.; Smith, Steven G. (National Marine Fisheries Service, Northwest Fisheries Science Center, Fish Ecology Division, Seattle, WA)

2004-12-01T23:59:59.000Z

352

Microsoft Word - Abengoa Final EA  

Broader source: Energy.gov (indexed) [DOE]

83 83 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO ABENGOA SOLAR INC. FOR THE SOLANA THERMAL ELECTRIC POWER PROJECT NEAR GILA BEND, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 May 2010 DOE/EA-1683 i CONTENTS Acronynms and Abbreviations ................................................................................................. viii SUMMARY ....................................................................................................................................x 1 Purpose and Need for Agency Action .......................................................................... 1-1

353

Texas Transportation Poll Final report  

E-Print Network [OSTI]

Texas Transportation Poll Final report PRC 14-16-F #12;2 Texas Transportation Poll Texas A&M Transportation Institute PRC 14-16-F September 2014 Authors Chris Simek Tina Geiselbrecht #12;3 Table of Contents .......................................................................................................................... 8 Transportation Funding

354

FINAL REPORT CANYON AND SLOPE  

E-Print Network [OSTI]

and the influence of canyons on slope cur- rents ; f) identification of communities which may be affected by oil#12;FINAL REPORT CANYON AND SLOPE PROCESSES STUDY VOLUME I EXECUTIVE S(2@lARY Prepared for United and provides diverse habi- tats for biological communities. In the Mid- and North Atlantic Region, canyons have

Mathis, Wayne N.

355

Final Rule (October 23, 2007)  

Broader source: Energy.gov [DOE]

Loan Guarantees for Projects That Employ Innovative Technologies; Final Rule: On May 16, 2007, the Department of Energy (DOE or the Department) published a Notice of Proposed Rulemaking and opportunity for comment (NOPR) to establish regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (Title XVII or the Act).

356

Stanford Geothermal Program Final Report  

E-Print Network [OSTI]

of Energy under grant number DE-FG07-95ID13370 Stanford Geothermal Program Department of PetroleumStanford Geothermal Program Final Report July 1996 - June 1999 Funded by the U.S. Department ....................................................................................................................6 2. THE ROLE OF CAPILLARY FORCES IN THE NATURAL STATE OF FRACTURED GEOTHERMAL RESERVOIRS

Stanford University

357

Microsoft Word - Phase I - Final Report _final_.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FINAL REPORT FINAL REPORT Reporting Period Start Date: October 1, 2003 Reporting Period End Date: May 31, 2004 Principal Author(s): Raymond Drnevich (Praxair) James Meagher (Praxair) Vasilis Papavassiliou (Praxair) Troy Raybold (Praxair) Peter Stuttaford (Power Systems Mfg.) Leonard Switzer (Praxair) Lee Rosen (Program Manager, Praxair) Issued August 2004 DOE Award No: DE-FC26-03NT41892 Submitted by: Praxair, Inc. 175 East Park Dr. Tonawanda, NY 14150 Subcontractor: Power Systems Mfg 1440 W. Indiantown Rd., Suite 200 Jupiter, FL 33458 ii DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Gov- ernment. Neither the United States Government nor any agency thereof, nor any of their employ- ees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the

358

Development of the helical reaction hydraulic turbine. Final technical report, July 1, 1996--June 30, 1998  

SciTech Connect (OSTI)

The present report contains the final results obtained during July 1996--July 1998. This report should be considered in association with the Annual Progress Report submitted in July 1997 due to the fact that not all of the intermediate results reflected in the Progress Report have been included in the Final Report. The aim of the project was to build a helical hydraulic turbine prototype and demonstrate its suitability and advantages as a novel apparatus to harness hydropower from ultra low-head rivers and other free water streams such as ocean currents or rivers without dams. The research objectives of the project are: Design, optimization and selection of the hydro foil section for the helical turbine; Design of the turbine for demonstration project; Construction and testing of the turbine module; Assessing test results and determining scale-up feasibility. The research conducted under this project has substantially exceeded the original goals including designing, constructing and testing of a scaled-up triple-helix turbine, as well as developing recommendations for application of the turbine for direct water pumping in irrigation systems and for future use in wind farms. Measurements collected during two years of turbine testing are kept in the PI files.

Gorlov, A.

1998-08-01T23:59:59.000Z

359

Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

Not Available

1994-12-01T23:59:59.000Z

360

Microsoft Word - FINAL_TECHNICAL_REPORT.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... 27 Figure 16 Comparison between simulation and experimental results: (a) Top view of final simulated...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Preliminary Three-Dimensional Simulation of Sediment and Cesium Transport in the Ogi Dam Reservoir using FLESCOT – Task 6, Subtask 2  

SciTech Connect (OSTI)

After the accident at the Fukushima Daiichi Nuclear Power Plant in March 2011, the Japan Atomic Energy Agency and the Pacific Northwest National Laboratory initiated a collaborative project on environmental restoration. In October 2013, the collaborative team started a task of three-dimensional modeling of sediment and cesium transport in the Fukushima environment using the FLESCOT (Flow, Energy, Salinity, Sediment Contaminant Transport) code. As the first trial, we applied it to the Ogi Dam Reservoir that is one of the reservoirs in the Japan Atomic Energy Agency’s (JAEA’s) investigation project. Three simulation cases under the following different temperature conditions were studied: • incoming rivers and the Ogi Dam Reservoir have the same water temperature • incoming rivers have lower water temperature than that of the reservoir • incoming rivers have higher water temperature than that of the reservoir. The preliminary simulations suggest that seasonal temperature changes influence the sediment and cesium transport. The preliminary results showed the following: • Suspended sand, and cesium adsorbed by sand, coming into the reservoirs from upstream rivers is deposited near the reservoir entrance. • Suspended silt, and cesium adsorbed by silt, is deposited farther in the reservoir. • Suspended clay, and cesium adsorbed by clay, travels the farthest into the reservoir. With sufficient time, the dissolved cesium reaches the downstream end of the reservoir. This preliminary modeling also suggests the possibility of a suitable dam operation to control the cesium migration farther downstream from the dam. JAEA has been sampling in the Ogi Dam Reservoir, but these data were not yet available for the current model calibration and validation for this reservoir. Nonetheless these preliminary FLESCOT modeling results were qualitatively valid and confirmed the applicability of the FLESCOT code to the Ogi Dam Reservoir, and in general to other reservoirs in the Fukushima environment. The issues to be addressed in future are the following: • Validate the simulation results by comparison with the investigation data. • Confirm the applicability of the FLESCOT code to Fukushima coastal areas. • Increase computation speed by parallelizing the FLESCOT code.

Onishi, Yasuo; Kurikami, Hiroshi; Yokuda, Satoru T.

2014-03-28T23:59:59.000Z

362

Environmental Assessment : Squawfish Management Program : Final.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

363

DOE_FINAL_REPORT_newest  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Scientific/Technical Report Final Scientific/Technical Report October 1 2008 to June 30 2011 Heat Flow and Gas Hydrates on the Continental Margin of India: Building on Results from NGHP Expedition 01 Submitted by: College of Oceanic and Atmospheric Science Oregon State University Corvallis, OR 97331-5503 Principal Investigator: Anne Trehu Graduate Research Assistant: Peter Kannberg Prepared for: United States Department of Energy National Energy Technology Laboratory November 15, 2012 Oil & Natural Gas Technology 2 Disclaimer: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or

364

Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Foreword COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada

365

Final sludge rules consolidate options  

SciTech Connect (OSTI)

Final federal regulations for use and disposal of waste water sludge were signed in 1992. Now states must adopt standards that are at least as stringent to maintain sludge disposal permitting authority. The regulations define specific limits for 12 sludge contaminants while the organic contaminants listed have been eliminated. The regulations recognize three basic methods of sludge use and disposal: land application, surface disposal, and incineration.

Walsh, T.K. [Metcalf & Eddy Inc., Wakefield, MA (United States)

1993-02-01T23:59:59.000Z

366

6-9-2010_WAPA_Final_Testimony.pdf  

Broader source: Energy.gov (indexed) [DOE]

ENERGY AND NATURAL RESOURCES ENERGY AND NATURAL RESOURCES UNITED STATES SENATE June 9, 2010 Madam Chairwoman and Members of the Subcommittee, I am Timothy J. Meeks, Administrator of the United States Department of Energy's Western Area Power Administration (Western). I am pleased to be here today to discuss S. 2891, the Hoover Power Allocation Act of 2009. This legislation seeks to amend the Hoover Power Plant Act of 1984. The legislation proposes revised allocations of the generation capacity and energy from the Hoover Dam power plant, a feature of the Boulder Canyon Project (BCP), after the existing contracts expire on September 30, 2017. Western's mission is to market and deliver reliable, cost-based hydroelectric power from facilities such as Hoover Dam. Hoover Dam was authorized and constructed in accordance with the Boulder Canyon Project

367

Final Information Quality Bulletin for Peer Review | Department...  

Broader source: Energy.gov (indexed) [DOE]

Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review Final Information Quality...

368

Overview of the Performance of PIT-Tag Interrogation Systems for Adult Salmonids at Bonneville and McNary Dams, 2002.  

SciTech Connect (OSTI)

During winter 2001, the U.S. Army Corps of Engineers (Corps) and Bonneville Power Administration (BPA) installed a prototype orifice-based PIT-tag interrogation system into the Washington Shore Ladder at Bonneville Dam (BWSL). Detectors were installed into 12 weirs: 4 downstream (Weirs 334-337) and 8 upstream (Weirs 352-359) from the fish release point (i.e., the exit ladder for the Adult Fish Facility). NOAA Fisheries (National Marine Fisheries Service--NMFS) tagged and released salmonids during 2001 to determine tag-reading efficiencies for different salmonid populations. Data analyses focused on the upper eight weirs. The 2001 tagging results for spring chinook salmon indicated that having detectors in four consecutive weirs would have been sufficient to yield a reading efficiency of 95%. The BWSL orifice-based system performed well until the coho and fall chinook salmon migrations began. Coho and fall chinook salmon appeared to use the weir overflows, and thus avoid detection, at much higher rates than biologists expected. During 2001, technology advances led to the development of significantly larger antennas than had been available earlier, and thus it was possible to build antennas of approximately 2 x 6 ft. Consequently, it became feasible to design interrogation systems for ladder locations where all fish would have to go through the antennas and thus could not avoid detection by using the weir overflows (Fig. 1). Destron Technologies by Digital Angel designed a prototype interrogation system with two antennas that was installed into the counting-window area in the Oregon Ladder at McNary Dam, where its performance could then be directly compared to that of the orifice-based system in the same ladder. Although the orifice-based systems appeared less effective than the fisheries community wanted for fall chinook and coho salmon, the decision was made to proceed with installations planned for Bonneville and McNary Dams because valuable data would still be collected. During the winter of 2002, the Corps and BPA installed PIT-tag interrogation systems into the Bradford Island and Cascades Island Fish Ladders at Bonneville Dam and into the Washington and Oregon Ladders at McNary Dam. Like BWSL in 2001, these ladders had eight weirs (16 orifices) outfitted with fiberglass antennas. Douglas County Public Utility District also installed an orifice-based system into its ladders at Wells Dam, but they were able to use weirs with no overflow sections wherein all fish had to swim through the orifice antennas. Thus, 2002 was the first year that the fisheries community had PIT-tag detection of adult salmonids at Bonneville, McNary, Wells, and Lower Granite Dams (Fig. 2). This overview will provide information on how well the systems at Bonneville and McNary Dams performed.

Downing, Sandra L.; Prentice, Earl F.

2003-06-01T23:59:59.000Z

369

Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.  

SciTech Connect (OSTI)

In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific riverbed elevation and providing minimum spawning flows that have the greatest chance of being maintained through egg incubation and fry emergence. However, managing the lower Columbia River for a stable tailwater elevation does not provide much operational flexibility at Bonneville Dam, which has little storage capacity. When river discharges increase due to rain events, the traditional approach has been to pass excess water at night to maintain stable tailwater elevations during the daytime. The underlying assumption of this strategy, referred to as reverse load following, is that fish do not spawn at night. However, Tiffan et al. (2005) showed that this assumption is false by documenting nighttime spawning by chum salmon in the Ives Island area. Similarly, McMichael et al. (2005) reported nighttime spawning by Chinook salmon (O. tshawytscha) in the Columbia River, indicating that diel spawning may be a common occurrence in Pacific salmon. During the latter portion of the chum spawning period in December 2003 and 2004, discharges from Bonneville Dam increased from an average of 3,398 m3/s (tailwater elevation {approx} 3.5 m above mean sea level) during the day to over 5,664 m3/s (tailwater elevation {approx} 5.1 m) at night, with peak discharges of 7,080 m{sup 3}/s (tailwater elevation {approx} 6.1 m). This caused concern among fishery managers regarding the potential effects of these high discharges on this population of spawning chum salmon, which is listed under the Endangered Species Act (National Oceanic and Atmospheric Administration 1999). We hypothesized that increased water velocities associated with elevated tailwaters might alter chum salmon spawning behavior if water velocities at redd locations increased beyond the range of suitability (>0.8 m/s; Salo 1991). In 2005, we investigated the movement and behavioral responses of spawning chum salmon at Ives Island to increased tailwater elevations at Bonneville Dam. We used acoustic telemetry to determine if the higher velocities associated with increased tailwater elevations caused fish to leave their re

Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

2008-12-01T23:59:59.000Z

370

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.  

SciTech Connect (OSTI)

We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

Mallette, Christine [Oregon Department of Fish and Wildlife

2009-07-28T23:59:59.000Z

371

Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008  

SciTech Connect (OSTI)

This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

2009-09-01T23:59:59.000Z

372

Congressional Final House Final Senate Current Request Mark  

Broader source: Energy.gov (indexed) [DOE]

FY 2010 FY 2010 FY 2010 FY 2010 ($ in thousands) Congressional Final House Final Senate Current Request Mark Mark Appropriation FOSSIL ENERGY R&D Coal 368,865 394,315 428,200 393,485 Natural Gas Technologies 25,000 25,000 25,000 17,364 Unconventional Fossil Energy Technologies 0 0 25,000 19,474 Program Direction 158,000 158,000 158,000 158,000 Plant & Capital Equipment 20,000 20,000 20,000 20,000 Environmental Restoration 10,000 10,000 10,000 10,000 Cooperative Res. & Development 0 0 5,000 4,868 Congressional Directed Projects 0 9,550 27,300 35,879 Special Recruitment Program 700 700 700 700 Subtotal 582,565 617,565 699,200 659,770 Transfer from Biomass (non-add) TOTAL FOSSIL ENERGY R&D 582,565 617,565 699,200 659,770 STRATEGIC PETROLEUM RESERVE Facilities Expansion

373

Creation of the dam for the No. 2 Kambaratinskaya HPP by large-scale blasting: analysis of planning experience and lessons learned  

SciTech Connect (OSTI)

Results of complex instrument observations and video taping during large-scale blasts detonated for creation of the dam at the No. 2 Kambaratinskaya HPP on the Naryn River in the Kyrgyz Republic are analyzed. Tests of the energy effectiveness of the explosives are evaluated, characteristics of LSB manifestations in seismic and air waves are revealed, and the shaping and movement of the rock mass are examined. A methodological analysis of the planning and production of the LSB is given.

Shuifer, M. I.; Argal, E. S. [JSC 'Gidrospetsproekt' (Russian Federation)

2012-05-15T23:59:59.000Z

374

Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2000 Annual Report.  

SciTech Connect (OSTI)

In 2000, the National Marine Fisheries Service and the University of Washington completed the eight year of a study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. A total of 20,313 hatchery steelhead were tagged with passive integrated transpoder (PIT) tags and released at Lower Granite Dam for reach survival estimation. They did not PIT tag any yearlying chinook salmon (O. tshawytscha) for reach survival estimates in 2000 because sufficient numbers for these estimates were available from other studies. Primary research objectives in 2000 were (1) to estimate reach and project survival in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations, and (2) to evaluate the survival-estimation models under prevailing conditions. In addition, they estimated survival from point of release to Lower Granite Dam and below for chinook salmon, steelhead, and sockeye salmon (O.nerka) PIT tagged and released at Snake River basin hatcheries and chinook salmon and steelhead PIT tagged and released at Snake River basin hatcheries and chinook salmon and steelhead PIT tagged and released at Snake River basin smolt traps. This report provides reach survival and travel time estimates for 2000 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures. Further details on methodology and statistical models used are provided in previous reports cited in the text.

Zabel, Richard; Smith, Steven G.; Muir, William D. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

2001-02-01T23:59:59.000Z

375

Final Flue Gas Cleaning (FFGC)  

E-Print Network [OSTI]

Final Flue Gas Cleaning (FFGC) Pilot Plant. The pilot plant (FFGC-PP) will be used to test and evaluate removal of air pollution constituents from the flue gas of a 160 MW, Houston-area power plant operating on 100% petcoke. The two-week long test.... TABLE III FLUE GAS COMPOSITION PETCOKE FIRED POWER PLANT H 2 O 3.2 % O 2 4.9 % CO 2 17.7 % HCl 10 ppm SO 2 6800 ppm SO 3 300 ppm H2SO4 mist 690 ppm NOx 260 ppm...

Stinger, D. H.; Romero, M. H.

2006-01-01T23:59:59.000Z

376

Final Rule (December 4, 2009)  

Broader source: Energy.gov [DOE]

Loan Guarantees for Projects that Employ Innovative Technologies: On October 23, 2007, the Department of Energy published a final rule establishing regulations for the loan guarantee program authorized by Section 1703 of Title XVII of the Energy Policy Act of 2005. Section 1703 of Title XVII authorizes the Secretary of Energy to make loan guarantees for projects that “avoid, reduce, or sequester air pollutants or anthropogenic emissions of greenhouse gases; and employ new or significantly improved technologies as compared to commercial technologies in service in the United States at the time the guarantee is issued.”

377

[Experimental nuclear physics]. Final report  

SciTech Connect (OSTI)

This is the final report of the Nuclear Physics Laboratory of the University of Washington on work supported in part by US Department of Energy contract DE-AC06-81ER40048. It contains chapters on giant dipole resonances in excited nuclei, nucleus-nucleus reactions, astrophysics, polarization in nuclear reactions, fundamental symmetries and interactions, accelerator mass spectrometry (AMS), ultra-relativistic heavy ions, medium energy reactions, work by external users, instrumentation, accelerators and ion sources, and computer systems. An appendix lists Laboratory personnel, a Ph. D. degree granted in the 1990-1991 academic year, and publications. Refs., 41 figs., 7 tabs.

NONE

1991-04-01T23:59:59.000Z

378

Simulation of Sediment and Cesium Transport in the Ukedo River and the Ogi Dam Reservoir during a Rainfall Event using the TODAM Code  

SciTech Connect (OSTI)

The accident at the Fukushima Daiichi Nuclear Power Plant in March 2011 caused widespread environmental contamination. Although decontamination activities have been performed in residential areas of the Fukushima area, decontamination of forests, rivers, and reservoirs is still controversial because of the economical, ecological, and technical difficulties. Thus, an evaluation of contaminant transport in such an environment is important for safety assessment and for implementation of possible countermeasures to reduce radiation exposure to the public. The investigation revealed that heavy rainfall events play a significant role in transporting radioactive cesium deposited on the land surface, via soil erosion and sediment transport in rivers. Therefore, we simulated the sediment and cesium transport in the Ukedo River and its tributaries in Fukushima Prefecture, including the Ogaki Dam Reservoir, and the Ogi Dam Reservoir of the Oginosawa River in Fukushima Prefecture during and after a heavy rainfall event by using the TODAM (Time-dependent, One-dimensional Degradation And Migration) code. The main outcomes are the following: • Suspended sand is mostly deposited on the river bottom. Suspended silt and clay, on the other hand, are hardly deposited in the Ukedo River and its tributaries except in the Ogaki Dam Reservoir in the Ukedo River even in low river discharge conditions. • Cesium migrates mainly during high river discharge periods during heavy rainfall events. Silt and clay play more important roles in cesium transport to the sea than sand does. • The simulation results explain variations in the field data on cesium distributions in the river. Additional field data currently being collected and further modeling with these data may shed more light on the cesium distribution variations. • Effects of 40-hour heavy rainfall events on clay and cesium transport continue for more than a month. This is because these reservoirs slow down the storm-induced high flow moving through these reservoirs. • The reservoirs play a major role as a sink of sediment and cesium in the river systems. Some amounts of sediment pass through them along with cesium in dissolved and clay-sorbed cesium forms. • Effects of countermeasures such as overland decontamination, dam control and sorbent injection were tentatively estimated. The simulation suggested that overland decontamination and sorbent injection would be effective for decreasing the contamination of water in the reservoir and in the river below the dam.

Onishi, Yasuo; Yokuda, Satoru T.; Kurikami, Hiroshi

2014-03-28T23:59:59.000Z

379

PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL ...  

E-Print Network [OSTI]

Apr 16, 2010 ... PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL GRADES. Please view rather than print this information. A version without ...

saerens

2010-04-16T23:59:59.000Z

380

GDB - Human Genome Database final report  

SciTech Connect (OSTI)

This is the DOE final report for the GDB, Human Genome Database, project at the Johns Hopkins University.

Talbot, C. Conover, Jr.

2002-01-08T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Final Environmental Impact Statement August 2013  

E-Print Network [OSTI]

Final Environmental Impact Statement August 2013 Prepared for: State University Construction Fund Conservation Law. A 9 Draft or 9 Final (check one) Environmental Impact Statement has been completed Notice of Completion of Draft / Final EIS Page 2 of 2 Potential Environmental Impacts: A copy

Oh, Kwang W.

382

Final_Testimony(20).pdf  

Broader source: Energy.gov (indexed) [DOE]

1 1 1 Chairman Bingaman, Ranking Member Murkowski, Members of the Committee, thank you for the opportunity to discuss the Implementation of National Consensus Appliance Agreements Act of 2011 (S.398) and the Better Use of Light Bulbs Act (S.395). In June 2009, President Obama said, "One of the fastest, easiest, and cheapest ways to make our economy stronger and cleaner is to make our economy more energy efficient." 1 Energy-conserving appliance standards are one of the significant steps the Administration has taken to save energy in homes and businesses nationwide, and pave the way toward a clean energy future for our country. 2 Since January 2009, the Department of Energy has finalized new efficiency standards for more than twenty household and commercial

383

SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED  

Office of Legacy Management (LM)

SPECIAL REREVIEW SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED , ?4~0180N SctuAnr P. 0. 00x *a STATION F New YORK, N. Y. IN RLPLY RCFSRTO EID?f A- 43 MS ~-7405 eng-8 ". Subject: Contract No.H-7405 eng-8 with Metal Hydrides Incorporated. MEMORAhDUM to the Files. 1. Reference is made to basi.c communication dated 27 September 1945, Symbol No. EIDM 1%-30-b, requesting certain information with respect to the subject contract. 2. Reference pars,?-raph a. The Government committed to restore Contractor's plant 70 its original conditfon because of the fact that In furtherance of the Government work great expansion of facility ?.natallation in the Con- tractor's plant was required and the Contractor was un- W illing, in the event of termination or early cessation of

384

Microsoft Word - NT06555-Final  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Award No.: DE-NT0006555 Final Scientific/Technical Report October 1, 2008 to September 30, 2011 USE OF POLYMERS TO RECOVER VISCOUS OIL FROM UNCONVENTIONAL RESERVOIRS Submitted by: New Mexico Petroleum Recovery Research Center New Mexico Tech, 801 Leroy, Socorro, NM 87801 Authored By: Randall Scott Seright (Principal Investigator) Prepared for: United States Department of Energy National Energy Technology Laboratory October 12, 2011 Office of Fossil Energy ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or

385

Attributes Paper-Final.PDF  

Broader source: Energy.gov (indexed) [DOE]

October, 2000 Annex: Attributes of Proliferation Resistance for Civilian Nuclear Power Systems Annex: Attributes of Proliferation Resistance for Civilian Nuclear Power Systems Attributes Paper-Final (9/19/00) 1 Attributes of Proliferation Resistance for Civilian Nuclear Power Systems Preface The NERAC 1 Task Force on Technology Opportunities for Increasing the Proliferation Resistance of Global Civilian Nuclear Power Systems (TOPS) determined at its first meeting in November 1999 that a set of metrics was needed to judge proliferation resistance and to identify areas in which technical contributions could be useful. However, because of the time constraints imposed on the Task Force and the difficulty of developing quantifiable metrics, it was decided that a set of qualitative attributes could

386

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Flaming Gorge Microwave Site Communications Building Access Road Repairs Flaming Gorge Microwave Site Communications Building Access Road Repairs Daggett County, Utah A. Brief Description of Proposal: Westem Area Power Administration (Westem) proposes to conduct routine maintenance and repair an access road right-of-way to its Flaming Gorge microwave site communications building. The building is located on a hill to the west of the Flaming Gorge Dam visitor center parking lot. Road improvements will be conducted on approximately 500 linear feet of existing road to improve drivability and access by Western crews to the communications building. Western crews will utilize rubber-tired vehicles including a motor grader, backhoe tractor, and bobcat skid steer loader to improve the access road and create a safe travel surface.

387

Acoustic Camera Evaluation of Juvenile Salmonid Approach and Fate at Surface Flow Outlets of Two Hydropower Dams  

SciTech Connect (OSTI)

The objective of this study was to estimate and compare fate probabilities for juvenile salmon approaching two surface flow outlets (SFOs) to identify effective design characteristics. The SFOs differed principally in forebay location, depth, discharge, and water velocity over a sharp-crested weir. Both outlets were about 20 ft wide. The 22-ft deep Bonneville Powerhouse 2 Corner Collector (B2CC) was located in the southwest corner of the forebay and passed 5,000 ft3/s of water at normal-pool elevation. In contrast, The Dalles Dam ice and trash sluiceway outlet above Main Unit 1-3 (TDITC) was not located in a forebay corner, was only 7-ft deep, and discharged about 933 ft3/s at normal-pool elevation. The linear velocity of water over the weir was about 15 ft/s at the B2CC and 5 ft/s at the TDITC. We used a Dual-Frequency Identification Sonar (DIDSON) to record movements of fish within about 65 ft of the B2CC and within 35 ft of the TDITC. We actively tracked fish by manually adjusting pan and tilt rotator angles to keep targets in view. Contrary to expectations, active tracking did not provide a predominance of long tracks that clearly indicated fish fate because most tracks were incomplete. Active tracking did increase error in fish-position estimation, which complicated data processing, so we plan to sample multiple fixed zones in the future. The probability of fish entering each SFO was estimated by a Markov chain analysis, which did not require complete fish tracks. At the B2CC, we tracked 7,943 juvenile salmonids and most of them entered the B2CC. Fish moving south 40 to 60 ft upstream of the dam face were more likely to enter the eddy at the south end of the powerhouse than to enter the B2CC. At the TDITC, we tracked 2,821 smolts. Fish movement was complex with active swimming toward and away from the entrance. The high entrance probability zone (EPZ), where over 90% of tracked fish entered the SFO, extended 32 ft out at the B2CC and only 8 ft out at the TDITC. Greater discharge at the B2CC pushed the entrainment zone (EZ - where flow exceeded 7 ft/s) upstream from the entrance so that fish were entrained before they began to struggle against the flow. The high EPZ also was extended by flow along the powerhouse face at both sites, but more at the B2CC (about 450 ft) than at the TDITC (about 50 ft). Fish entering the large south eddy that circulated past the B2CC entrance were provided multiple opportunities to discover and enter. In contrast, fish moving past the sampled TDITC entrance either entered adjacent sluiceway openings or moved west to the spillway because there was no eddy to provide additional opportunities. Information from our study should be useful to fisheries managers and engineers seeking to transfer SFO technologies from one site to another. There are two important components to designing SFOs, the location within the forebay to take advantage of forebay circulation and specific entrance characteristics such as discharge and depth which affect the size and shape of the EZ and the high EPZ. Providing SFOs with an EZ extending upstream of structure could reduce entrance rejection, decrease forebay residence time and risk of predation, and increase passage of schools of smolts.

Ploskey, Gene R.; Johnson, Gary E.; Weiland, Mark A.; Khan, Fenton; Mueller, Robert P.; Serkowski, John A.; Rakowski, Cynthia L.; Hedgepeth, J.; Skalski, John R.; Ebberts, Blaine D.; Klatte, Bernard A.

2006-08-04T23:59:59.000Z

388

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, Annual Report 2003.  

SciTech Connect (OSTI)

Redd counts were used to document the spawning distribution of fall chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2003; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992) and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2003 was funded by the Bonneville Power Administration (Projects 199801003, 199801004, 199403400, 198335003), Idaho Power Company, and Bureau of Land Management.

Garcia, A.P.; Bradbury, S.M.; Arnsberg, B.D.

2004-08-01T23:59:59.000Z

389

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2005 Annual Report.  

SciTech Connect (OSTI)

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2005; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U.S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2005 was funded by the Bonneville Power Administration and Idaho Power Company.

Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

2006-10-01T23:59:59.000Z

390

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2004 Annual Report.  

SciTech Connect (OSTI)

Redd counts were used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U.S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2004; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2004 was funded by the Bonneville Power Administration, Idaho Power Company, and Bureau of Land Management.

Garcia, A.P.; Bradbury, S.; Arnsberg, B.D.; Rocklage, S.J.; Groves, P.A.

2005-10-01T23:59:59.000Z

391

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, Annual Report 2002.  

SciTech Connect (OSTI)

Redd counts were used to document the spawning distribution of fall chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2001; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992) and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches into a single document containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2002 was funded by the Bonneville Power Administration (Projects 1998-01-003 and 1994-03-400) and the Idaho Power Company.

Garcia, Aaron P.; Bradbury, S.M.; Arnsberg, Billy D.

2003-09-01T23:59:59.000Z

392

Advanced Design Studies. Final report  

SciTech Connect (OSTI)

The ARIES-CS project was a multi-year multi-institutional project to assess the feasibility of a compact stellarator as a fusion power plant. The work herein describes efforts to help design one aspect of the device, the divertor, which is responsible for the removal of particle and heat flux from the system, acting as the first point of contact between the magnetically confined hot plasma and the outside world. Specifically, its location and topology are explored, extending previous work on the sub ject. An optimized design is determined for the thermal particle flux using a suite of 3D stellarator design codes which trace magnetic field lines from just inside the confined plasma edge to their strike points on divertor plates. These divertor plates are specified with a newly developed plate design code. It is found that a satisfactory thermal design exists which maintains the plate temperature and heat load distribution below tolerable engineering limits. The design is unique, including a toroidal taper on the outboard plates which was found to be important to our results. The maximum thermal heat flux for the final design was 3.61 M W/m2 and the maximum peaking factor was 10.3, below prescribed limits of 10 M W/m2 and 15.6, respectively. The median length of field lines reaching the plates is about 250 m and their average angle of inclination to the surface is 2 deg. Finally, an analysis of the fast alphas, resulting from fusion in the core, which escape the plasma was performed. A method is developed for obtaining the mapping from magnetic coordinates to real-space coordinates for the ARIES-CS. This allows the alpha exit locations to be identified in real space for the first time. These were then traced using the field line algorithm as well as a guiding center routine accounting for their mass, charge, and specific direction and energy. Results show that the current design is inadequate for accommodating the alpha heat flux, capturing at most 1/3 of lost alphas. However the distribution of the alphas on the device first wall indicates that a viable solution likely exists. It is noted that future designs must be sought which specifically address the fusion alphas through an integrated approach involving physics and engineering teams.

Steiner, Don [Rensselaer Polytechnic Institute, Troy, NY (United States)

2012-12-01T23:59:59.000Z

393

Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities: Cooperative Research and Development Final Report, CRADA Number CRD-08-309  

SciTech Connect (OSTI)

This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement and verification processes; risk and responsibility allocation; and financial viability of projects.

Anderson, K.

2012-04-01T23:59:59.000Z

394

Demand Side Bidding. Final Report  

SciTech Connect (OSTI)

This document sets forth the final report for a financial assistance award for the National Association of Regulatory Utility Commissioners (NARUC) to enhance coordination between the building operators and power system operators in terms of demand-side responses to Location Based Marginal Pricing (LBMP). Potential benefits of this project include improved power system reliability, enhanced environmental quality, mitigation of high locational prices within congested areas, and the reduction of market barriers for demand-side market participants. NARUC, led by its Committee on Energy Resources and the Environment (ERE), actively works to promote the development and use of energy efficiency and clean distributive energy policies within the framework of a dynamic regulatory environment. Electric industry restructuring, energy shortages in California, and energy market transformation intensifies the need for reliable information and strategies regarding electric reliability policy and practice. NARUC promotes clean distributive generation and increased energy efficiency in the context of the energy sector restructuring process. NARUC, through ERE's Subcommittee on Energy Efficiency, strives to improve energy efficiency by creating working markets. Market transformation seeks opportunities where small amounts of investment can create sustainable markets for more efficient products, services, and design practices.

Spahn, Andrew

2003-12-31T23:59:59.000Z

395

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.  

SciTech Connect (OSTI)

Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven-transducer splitbeam hydroacoustic system was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. Two of the seven transducers were mounted to the frame containing the strobe lights and were oriented horizontally. The remaining five transducers were spaced approximately 4 m apart on individual floating frames upstream of the barge, with the transducers looking vertically downward.

Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

2003-01-01T23:59:59.000Z

396

Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 More...

397

Attachment C - Summary GHG Emissions Data FINAL | Department...  

Broader source: Energy.gov (indexed) [DOE]

Attachment C - Summary GHG Emissions Data FINAL Attachment C - Summary GHG Emissions Data FINAL Attachment-C-Summary-GHG-Emissions-Data-FINAL.xlsx Description Attachment C -...

398

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program This document contains the Final...

399

EIS-0026: Final Environmental Impact Statement | Department of...  

Energy Savers [EERE]

26: Final Environmental Impact Statement EIS-0026: Final Environmental Impact Statement Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico EIS-0026: Final Environmental...

400

EIS-0064: Final Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

Environmental Impact Statement, volume 3 More Documents & Publications EIS-0015: Final Environmental Impact Statement EIS-0026: Final Environmental Impact Statement EIS-0050: Final...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - Fact Sheet Environment 100808 FINAL.doc | Department...  

Broader source: Energy.gov (indexed) [DOE]

Environment 100808 FINAL.doc Microsoft Word - Fact Sheet Environment 100808 FINAL.doc Microsoft Word - Fact Sheet Environment 100808 FINAL.doc More Documents & Publications...

402

Supplemental Analysis for the Final Environmental Impact Statement...  

Office of Environmental Management (EM)

Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final...

403

EIS-0015: Final Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

15: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy EIS-0015: Final Environmental Impact Statement, volume 1 EIS-0015:...

404

EIS-0106: Final Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

106: Final Environmental Impact Statement EIS-0106: Final Environmental Impact Statement Great Falls-Conrad Transmission Line Project, Montana EIS-0106: Final Environmental Impact...

405

EIS-0290: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential...

406

EIS-0251: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0251: Final Environmental Impact Statement EIS-0251: Final Environmental Impact Statement Department of the Navy Final Environmental Impact Statement for a Container System for...

407

EIS-0050: Final Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

50: Final Environmental Impact Statement EIS-0050: Final Environmental Impact Statement Residential Conservation Service Program EIS-0050: Final Environmental Impact Statement More...

408

EIS-0072: Final Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

EIS-0072: Final Environmental Impact Statement EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota EIS-0072: Final...

409

EIS-0229: Final Programmatic Environmental Impact Statement ...  

Energy Savers [EERE]

EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the...

410

SPR Acquisition Procedures - Final Rulemaking | Department of...  

Office of Environmental Management (EM)

Point of Contact: Nathan Harvey, Director of Operatons and Readiness, Strategic Petroleum Reserve, (202) 586-4691 SPR Crude Oil Acquisition Procedures - Final Rulemaking More...

411

EA-1212-SA-01: Final Supplement Analysis  

Broader source: Energy.gov [DOE]

Final Supplement Analysis for the Environmental Assessment for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory

412

Final Report Port and Modal Elasticity Study  

E-Print Network [OSTI]

1 Final Report Port and Modal Elasticity Study Prepared for Southern California Association................................................................................................. 23 Financing Transportation Infrastructure for Port Access ..................................................................................... 27 Comparison of West Coast Port Facilities

California at Berkeley, University of

413

Energy Department Finalizes Loan Guarantee for Transformational...  

Office of Environmental Management (EM)

for Transformational Rooftop Solar Project Energy Department Finalizes Loan Guarantee for Transformational Rooftop Solar Project September 30, 2011 - 3:37pm Addthis Washington D.C....

414

Geothermal: Sponsored by OSTI -- NGDS Final Report  

Office of Scientific and Technical Information (OSTI)

Final Report Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications Advanced Search New Hot Docs News...

415

Final Technical Report on Radioxenon Event Analysis  

SciTech Connect (OSTI)

This is a final deliverable report for the Advanced Spectral Analysis for Radioxenon project with a focus on radioxenon event categorization.

Ely, James H.; Cooper, Matthew W.; Hayes, James C.; Heimbigner, Tom R.; McIntyre, Justin I.; Schrom, Brian T.

2013-03-15T23:59:59.000Z

416

Geothermal: Sponsored by OSTI -- Final Report  

Office of Scientific and Technical Information (OSTI)

Final Report Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications Advanced Search New Hot Docs News...

417

EIS-0146: Final Programmatic Environmental Impact Statement ...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0146: Final Programmatic Environmental Impact Statement Clean Coal Technology Demonstration Program The proposed action evaluated in this PEIS is to...

418

BPA issues final decision on oversupply rate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

issues-final-decision-on-oversupply-rate Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

419

EIS-0269: Final Programmatic Environmental Impact Statement ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the...

420

Ocean Thermal Extractable Energy Visualization: Final Technical...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Approved for public release; distribution is unlimited OCEAN THERMAL EXTRACTABLE ENERGY VISUALIZATION Award DE-EE0002664 October 28, 2012 Final Technical Report Prepared by...

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Bureau of Land Management - Final Programmatic Environmental...  

Open Energy Info (EERE)

Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the Western United States...

422

EA-1535: Final Programmatic Environmental Assessment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2007) More Documents & Publications EA-1535: Finding of No Significant Impact EA-1037: Final Environmental Assessment EIS-0472: Draft Programmatic Environmental Impact Statement...

423

START Application - Final | Department of Energy  

Office of Environmental Management (EM)

START ApplicationFINAL0.pdf More Documents & Publications START-Alaska Application Alaska START Application Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL)...

424

Global Freshwater Resources: Soft-Path Solutions for the 21st Century  

Science Journals Connector (OSTI)

...2001 ). 29 S. Postel , Pillar of Sand: Can the Irrigation...recent papers about water and sustainability and a water and...by the reservoir behind the Three Gorges Dam in China...fraught with uncertainty. Three basic futures are possible...

Peter H. Gleick

2003-11-28T23:59:59.000Z

425

Santa Barbara Final Technical Report  

SciTech Connect (OSTI)

This report serves as the Final Report for Santa Barbara County’s Energy Efficiency and Conservation Block Grant (EECBG) BetterBuildings Neighborhood Program (BBNP) award from the U.S. Department of Energy (DOE). This report explains how DOE BBNP funding was invested to develop robust program infrastructure designed to help property owners complete energy improvements, thereby generating substantial outcomes for the local environment and economy. It provides an overview of program development and design within the grant period, program accomplishments and challenges to date, and a plan for the future sustainability of emPower, the County’s innovative clean energy and building efficiency program. During the grant period, Santa Barbara County’s emPower program primarily targeted 32,000 owner occupied, single family, detached residential homes over 25 years old within the County. In order to help these homeowners and their contractors overcome market barriers to completing residential energy improvements, the program developed and promoted six voluntary, market-based service areas: 1) low cost residential financing (loan loss reserve with two local credit unions), 2) residential rebates, 3) local customer service, 4) expert energy advising, 5) workforce development and training, and 6) marketing, education and outreach. The main goals of the program were to lower building energy use, create jobs and develop a lasting regional building performance market. These services have generated important early outcomes and lessons after the program’s first two years in service. The DOE BBNP funding was extended through October 2014 to enable Santa Barbara County to generate continued outcomes. In fact, funding related to residential financing remains wholly available for the foreseeable future to continue offering Home Upgrade Loans to approximately 1,300 homeowners. The County’s investment of DOE BBNP funding was used to build a lasting, effective, and innovative program design that has earned statewide recognition and distinction. As a result of the County’s leadership, the California Energy Commission (CEC) and the California Public Utilities Commission (PUC) offered over $5 million in funding to continue realizing ongoing returns on the initial investment made in developing emPower, alongside remaining (extended) DOE BBNP funds. These new funding sources, accepted by the County Board of Supervisors on June 25, 2013, also allow the program to expand its innovative energy solutions to the broader region, including Ventura and San Luis Obispo Counties.

Hacker, Angela; Hansen, Sherman; Watkins, Ashley

2013-11-30T23:59:59.000Z

426

Final report on SNAC 11  

SciTech Connect (OSTI)

This report details how the $5,000 DOE grant to support the workshop titled “Sterile Neutrinos at the Crossroads” (or SNAC11) was allocated and spent. The SNAC11 workshop covered three days during which there were 28 talks, multiple discussion sessions, a poster session with 9 posters delivered, and an impromptu public lecture on the OPERA superluminal neutrino result by the former project manager of OPERA (this was the first official OPERA talk on the subject in North America). The workshop scientific agenda can be viewed at http://www.cpe.vt.edu/snac/program.html. Emerging out of the workshop discussions, was the idea to write a comprehensive white paper describing the current state of the light sterile neutrino. This effort soon became an international collaboration. The final document, titled “Light Sterile Neutrinos: A White Paper” has nearly 200 authors, is 267 pages long, and cites 730 unique references. It has been posted the preprint archive as arXiv:1204.5379 [hep-ph]. Workshop local organizing committee co-chairs, Patrick Huber and Jonathan Link, are the white paper’s head editors. The white paper’s sections and section editors are as follows: 1. Theory and Motivation (Gabriela Barenboim, Valencia and Werner Rodejohann, MPI Heidelberg) 2. Astrophysical Evidence (Kev Abazajian, UC Irvine and Yvonne Wong, Aachen) 3. Evidence from Oscillation Experiments (Joachim Kopp, FNAL and Bill Louis, LANL) 4. Global Picture (Thierry Lasserre, CEA Saclay and Thomas Schwetz, MPI Heidelberg) 5. Requirements for Future Measurements (Bonnie Fleming, Yale and Joe Formaggio, MIT) 6. Appendix: Possible Future Experiments (Patrick Huber, Virginia Tech and Jon Link, Virginia Tech) In all 56 people participated in the workshop, of these 11 were young scientists. The workshop was covered in a feature article in Science (Science, 334, (2011), 304-306.). The DOE award was spent, as budgeted, as contractual services to VT CPE, which is the unit within the University which organizes conferences. Specifically, the travel cost of the speakers P. Langacker, K. Schreckenbach and P. Vogel was covered as well as bus transportation to KURF and to/from the airport.

Huber, Patrick [Virginia Tech

2013-06-26T23:59:59.000Z

427

Survey of Radionuclide Distributions Resulting from the Church Rock, New Mexico, Uranium Mill Tailings Pond Dam Failure  

SciTech Connect (OSTI)

An intensive site survey and on-site analysis program were conducted to evaluate the distribution of four radionucliGes in the general vicinity of Gallup, New Mexico, subsequent to the accidental breach of a uranium mill tailings pond dam and the release of a large quantity of tailings pond materials. The objective of this work was to determine the distribution and concentration levels of {sup 210}Pb, {sup 226}Ra, {sup 230}Th, and {sup 238}U in the arroyo that is immediately adjacent to the uranium tailings pond (pipeline arroyo) and in the Rio Puerco arroyo into which the pipeline arroyo drains. An intensive survey between the United Nuclear Corporation (UNC) Church Rock Mill site and the New Mexico-Arizona state border was performed. Sampling locations were established at approximately 500-ft intervals along the arroyo. During the weeks of September 24 through October 5, 1979, a series of samples was collected from alternate sampling locations along the arroyo. The purpose of this collection of samples and their subsequent analysis was to provide an immediate evaluation of the extent and the levels of radioactive contamination. The data obtained from this extensive survey were then compared to action levels which had been proposed by the Nuclear Regulatory Commission and were adapted by the New Mexico Environmental Improvement Division (NMEID) for {sup 230}Th and {sup 226}Ra concentrations that would require site cleanup. The Pacific Northwest Laboratory/Nuclear Regulatory Commission mobile laboratory van was on-site at the UNC Church Rock Mill from September 22, 1979, through December 13, 1979, and was manned by one or more PNL personnel for all but four weeks of this time period. Approximately 1200 samples associated with the Rio Puerco survey were analyzed 1n the laboratory. An additional 1200 samples related to the Rio Puerco cleanup operations which the United Nuclear Corporation was conducting were analyzed on-site in the mobile laboratory. The purpose of these analyses was to determine the effectiveness of the cleanup operations that were ongoing and to evaluate what additional cleanup would be required. This on-site analysis of radioactive contamination constituted the principal task of this project, with the identification of those portions of the arroyo exceeding the NMEID proposed cleanup criteria being the major output. Additiond1 tasks included an evaluation of the initial soil sampling scheme (letter from T. Wolff [NMEID] to J. Abiss [UNC]. oated September 25, 1979) and the proposed NMEID verification sampling scheme (letter from T. Buhl [NMEID] to H. Miller [NRC]. dated April 23, 1980).

Weimer, W. C.; Kinnison, R. R.; Reeves, J. H.

1981-12-01T23:59:59.000Z

428

Sustainability Initiative Task Force Final Report  

E-Print Network [OSTI]

UW­Madison Sustainability Initiative Task Force Final Report October 2010 #12;We are pleased to present the final report of the campus Sustainability Task Force. This report fulfills the charge we gave to sustainability for consideration by UW­Madison's leadership and campus community. There are many reasons why

Sheridan, Jennifer

429

Characterization of Fish Passage Conditions through a Francis Turbine, Spillway, and Regulating Outlet at Detroit Dam, Oregon, Using Sensor Fish, 2009  

SciTech Connect (OSTI)

Fish passage conditions through two spillways, a Francis turbine, and a regulating outlet (RO) at Detroit Dam on the North Santiam River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions, identifying potential fish injury regions within the routes. The study was performed in July, October, and December 2009 concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe strike, collision, and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates. Comparison of the three passage routes evaluated at Detroit Dam indicates that the RO passage route through the 5-ft gate opening was relatively the safest route for fish passage under the operating conditions tested; turbine passage was the most deleterious. These observations were supported also by the survival and malady estimates obtained from live-fish testing. Injury rates were highest for turbine and spillway passage. However, none of the passage routes tested is safe for juvenile salmonid passage.

Duncan, Joanne P.; Carlson, Thomas J.

2011-05-06T23:59:59.000Z

430

Microsoft Word - Roza_Transformer_Replacement_CX_Final.doc  

Broader source: Energy.gov (indexed) [DOE]

Clearance Memorandum Clearance Memorandum Patricia Smith Project Manager KEWU-4 Proposed Action: Replace two broken transformers near the Roza Dam adult trap facility Budget Information: Work Order #188534, Task #1 Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: Roza Diversion Dam Adult Trap Facility , Township 15 North, Range 19 East,

431

FINAL ENVIRONMENTAL ASSESSMENT / FINAL REGULATORY IMPACT REVIEW / INITIAL REGULATORY FLEXIBILITY ANALYSIS  

E-Print Network [OSTI]

FINAL ENVIRONMENTAL ASSESSMENT / FINAL REGULATORY IMPACT REVIEW / INITIAL REGULATORY FLEXIBILITY ..............................................................................................16 2 REGULATORY IMPACT REVIEW ANALYSIS for Amendment 83 to the Fishery Management Plan for Groundfish of the Gulf of Alaska ALLOCATION

432

Blue-Dam  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April but not fully described or represented in the Manual until now. Correction: In the Heat Pump Equipment Conversion and Upgrade in Commercial Buildings section, the custom...

433

Huub van Dam | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

process termination) and soft errors (intermittent incorrect behavior of the compute platform often leading to silent data corruption) can be addressed in quantum chemistry...

434

Blue-Dam  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Change: The requirements of "qualified installer" and "by code" for Commercial Ductless Heat Pumps has been removed. Rationale: Not every jurisdiction has an applicable code, and...

435

Blue-Dam  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

align with the Interim Reference Deemed Measure List. Change: Specifications for Ductless Heat Pumps in Commercial Buildings have been corrected. This expands acceptable...

436

EIS-0435: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement EIS-0435: Final Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota...

437

EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...  

Energy Savers [EERE]

Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National...

438

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.  

SciTech Connect (OSTI)

Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly within a 3-day block throughout the study period. Hydroacoustic technology was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The hydroacoustic system in 2003 comprised seven splitbeam transducers arrayed in front of the strobe lights, two multibeam transducers behind the lights, and a mobile splitbeam system. The seven splitbeam transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. These transducers were spaced approximately 4 m apart on an aluminum frame floating upstream of the barge and looked vertically downward. The multibeam transducers monitored the distribution of fish directly behind and to both sides of the lights, while the mobile splitbeam system looked at the distribution of fish within the third powerplant forebay. To augment the hydroacoustic data, additional studies were conducted. The hydrodynamic characteristics of the third powerplant forebay were measured, and acoustically tagged juvenile kokanee were released upstream of the strobe lights and tracked within the forebay and downstream of the dam. Analysis of the effect of strobe lights on kokanee and rainbow trout focused on the number of fish detected in each of the areas covered by one of the downlooking transducers, the timing of fish arrivals after the status of the strobe lights changed, fish swimming effort (detected velocity minus flow velocity), and fish swimming direction. Water velocity measurements were used to determine fish swimming effort. The tracking of tagged kokanee provided data on fish movements into and out of the third powerplant forebay, including entrainment.

Simmons, M.; McKinstry, C.; Cook, C.

2004-01-01T23:59:59.000Z

439

EIS-0156: Cowlitz Falls Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of constructing and operating a proposed 70-megawatt hydroelectric dam and electrical infrastructure on the Cowlitz River near Morton and Randle, Washington. The U.S. Department of Energy's Bonneville Power Administration adopted this statement on 12/6/1990 to fulfil its National Environmental Policy Act requirement for its proposed action to acquire the power output from the Cowlitz Falls Hydroelectric Project.

440

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.  

SciTech Connect (OSTI)

Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

Griswold, Jim; Townsend, Richard L.; Skalski, John R.

2008-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Microsoft Word - CERFDOE Final Report - 071204.doc  

Broader source: Energy.gov (indexed) [DOE]

Research Assessment of Project Research Assessment of Project Management Factors Affecting Department of Energy Project Success Submitted to: Office of Engineering and Construction Management U.S. Department of Energy July 12, 2004 Final Report Civil Engineering Research Foundation CERFDOE Final Report - 071204.doc 1 Independent Research Assessment of Project Management Factors Affecting Department of Energy Project Success Civil Engineering Research Foundation CERFDOE Final Report - 071204.doc 2 CONTENTS EXECUTIVE SUMMARY 3 GLOSSARY 6 1. INTRODUCTION 7 2. PROJECT SUMMARIES 11 3. PROJECT FACTORS 16 3a. ORGANIZATION AND PERSONNEL 16 3b. PROJECT MANAGEMENT 21 3c. PROCUREMENT 25 3d. PROJECT-SPECIFIC FACTORS 28

442

Microsoft Word - Norwich Final EA.doc  

Broader source: Energy.gov (indexed) [DOE]

6 6 FINAL ENVIRONMENTAL ASSESSMENT FOR THE NORWICH COGENERATION INITIATIVE, NORWICH, CONNECTICUT U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia March 2011 DOE/EA-1836 FINAL ENVIRONMENTAL ASSESSMENT FOR THE NORWICH COGENERATION INITIATIVE, NORWICH, CONNECTICUT U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia March 2011 DOE/EA-1836 iii March 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE or the Department) Title: Final Environmental Assessment for the Norwich Cogeneration Initiative, Norwich, Connecticut (DOE/EA-1836) Contact: For additional copies or more information about this environmental assessment (EA),

443

DUF6 Final EIS Document Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EIS Request Form EIS Request Form Final EIS Document Request Form Use the form below to order copies of the DUF6 Conversion Facility Final EISs and Records of Decision. Step 3 Select the EIS that you want to receive. Select one of the three options below. My request applies to the Paducah Conversion Facility EIS My request applies to the Portsmouth Conversion Facility EIS My request applies to both the Paducah and the Portsmouth Conversion Facility EISs Step 1 Request EIS copies. Choose one or more of the following: Mail me a compact disc (CD-ROM) of the Final EIS and Record of Decision. Mail me a printed copy of the Final EIS and Record of Decision. Step 2 Enter your personal information. You must submit your full name and complete address including zip code to receive postal mail. You must provide an email address if you want to receive email notifications.

444

Final Workshop of Department's Inaugural Technology Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment July 12, 2011 - 12:01pm Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs This Wednesday, Under Secretary Steven Koonin will host the sixth and final workshop of the Department's inaugural Quadrennial Technology Review. The aim of the comprehensive assessment is to strengthen and streamline how the Department achieves its energy, economic and environmental goals over the next five year. You can watch live starting at 8:30 AM ET. Secretary Chu is scheduled to speak at approximately 12:45 PM and the event is set to run until 5 PM. Before and during the event, you can tweet questions and have them answered

445

Norcal Prototype LNG Truck Fleet: Final Results  

SciTech Connect (OSTI)

U.S. DOE and National Renewable Energy Laboratory evaluated Norcal Waste Systems liquefied natural gas (LNG) waste transfer trucks. Trucks had prototype Cummins Westport ISXG engines. Report gives final evaluation results.

Not Available

2004-07-01T23:59:59.000Z

446

Post 2014 Final Allocations.pdf  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

am BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Western Area Power Administration Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation AGENCY: Western Area Power...

447

Helicopter final assembly critical path analysis  

E-Print Network [OSTI]

Helicopter final assembly involves the installation of hundreds of components into the aircraft and takes thousands of man-hours. Meeting production targets such as total build days and total aircraft man-hours can be ...

Daigh, Sara L. (Sarah Louise), 1981-

2012-01-01T23:59:59.000Z

448

Final Vitrification Melter And Vessels Evaluation Documentation  

Broader source: Energy.gov [DOE]

DOE has prepared final evaluations and made waste incidental to reprocessing determinations for the vitrification melter and feed vessels (the concentrator feed makeup tank and the melter feed hold...

449

Microsoft Word - Agencies Publish Final Environmental Impact...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bethany Shively, DOE (202) 586-4940 Joe Walsh, USFS (202) 205-1134 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West WASHINGTON, DC -...

450

Final Workshop of Department's Inaugural Technology Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment July 12, 2011 - 12:01pm Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs This Wednesday, Under Secretary Steven Koonin will host the sixth and final workshop of the Department's inaugural Quadrennial Technology Review. The aim of the comprehensive assessment is to strengthen and streamline how the Department achieves its energy, economic and environmental goals over the next five year. You can watch live starting at 8:30 AM ET. Secretary Chu is scheduled to speak at approximately 12:45 PM and the event is set to run until 5 PM. Before and during the event, you can tweet questions and have them answered

451

Four leptons final states from $??$ fusion  

E-Print Network [OSTI]

I present a systematic study of all possible four leptons final states from $\\gamma\\gamma$ collisions. It is given a detailed account of fermion masses effects which are sizable since several collinear and $t$ channel enancements occur. The effects of angular cuts on the final charged leptons are also discussed. To perform the computation I have used the recently developed ALPHA algorithm (and the resulting code) for the automatic computation of scattering amplitudes.

Mauro Moretti

1996-06-04T23:59:59.000Z

452

Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1988-1989 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 1988 through March 1989 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. Highlights of results of our work in the Dalles and Bonneville reservoirs are: using setlines, we caught 1,586 sturgeon in The Dalles Reservoir and 484 sturgeon in Bonneville Reservoir in 1988. Fork length of fish caught ranged from 34 cm to 274 cm. Of the fish caught we marked 1,248 in The Dalles Reservoir and 341 in Bonneville Reservoir. Of the fish marked in 1988, we recaptured 82 in The Dalles Reservoir and none in Bonneville Reservoir. We recaptured 89 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 35 fish marked in 1988 and 16 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 2 sturgeon marked in 1988 in Bonneville Reservoir. Individual papers were processed separately for the data base.

Nigro, Anthony A. (Oregon Dept. of Fish and Wildlife, Portland, OR (USA))

1989-09-01T23:59:59.000Z

453

Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007  

SciTech Connect (OSTI)

The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

2008-03-12T23:59:59.000Z

454

Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.  

SciTech Connect (OSTI)

In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.

Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

2003-04-01T23:59:59.000Z

455

Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam; Smolt Monitoring by Federal and Non-Federal Entities, 2000 Annual Report.  

SciTech Connect (OSTI)

This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 2000 spring out-migration at migrant traps on the Snake River and Salmon River. In 2000 the Nez Perce Tribe released significant numbers of hatchery chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery chinook salmon catch at the Snake River trap was 36% of the 1999 number. The wild chinook catch was 34% of the previous year's catch. Hatchery steelhead trout catch was 121% of 1999 numbers. Wild steelhead trout catch was 139% of 1999 numbers. The Snake River trap collected 689 age-0 chinook salmon. During 2000, the Snake River trap captured 40 hatchery and 92 wild/natural sockeye salmon and 159 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations began on March 13 and were terminated for the season due to high flows on June 16. There were no down days due to high flows or debris. Hatchery chinook salmon catch at the Salmon River trap was 96%, and wild chinook salmon catch was 66% of 1999 numbers. The hatchery steelhead trout collection in 2000 was 90% of the 1999 numbers. Wild steelhead trout collection in 2000 was 147% of the previous years catch. Trap operations began on March 13 and were terminated for the season due to high flows on May 22. There were no days where the trap was out of operation due to high flow or debris. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for passive integrated transponder (PIT) tagged chinook salmon and steelhead trout, marked at the head of the reservoir, were affected by discharge. For fish tagged at the Snake River trap, statistical analysis of 2000 data detected a significant relation between migration rate and discharge. For hatchery and wild chinook salmon, there was a 3.0 and 16.2-fold increase in migration rate, respectively, between 50 and 100 kcfs. For hatchery steelhead, there was a 2.7-fold increase in migration rate, respectively, between 50 kcfs and 100 kcfs. The statistical analysis could not detect a significant relation between migration rate and discharge for wild steelhead in 2000. For fish marked at the Salmon River trap, statistical analysis of the 2000 data detected a significant relation between migration rate and discharge for hatchery chinook salmon at the 0.05 level of significance and at the 0.1 level of significance for wild chinook salmon. Migration rate increased 3.2- and 1.9-fold, respectively, between 50 and 100 kcfs. For hatchery steelhead there was a 1.5-fold increase in migration rate between 50 kcfs and 100 kcfs. Insufficient numbers of wild steelhead trout were PIT tagged at the Salmon River trap to estimate travel time and migration rate to Lower Granite Dam. Fish tagged with PIT tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993, cumulative interrogation data is not comparable with the prior five years (1988-1992). Cumulative interrogations at the four dams for fish marked at the Snake River trap were 57% for hatchery chinook, 65% for wild chinook, 73% for hatchery steelhead and 71% for wild steelhead. Cumulative interrogations at the four dams for fish marked at the Salmon River trap were 53% for hatchery chinook, 64% for wild chinook salmon, 68% for hatchery steelhead trout, and 65% for wild steelhead trout.

Buettner, Edwin W.; Putnam, Scott A.

2002-08-01T23:59:59.000Z

456

Monitoring and Evaluation of Smolt Migration in the Columbia Basin, Volume XIV; Evaluation of 2006 Prediction of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead at Rock Island, Lower Granite, McNary, John Day and Bonneville Dams using Program Real Time, Technical Report 2006.  

SciTech Connect (OSTI)

Program RealTime provided monitoring and forecasting of the 2006 inseason outmigrations via the internet for 32 PIT-tagged stocks of wild ESU chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville Dams. Twenty-four stocks are of wild yearling chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2006, and have at least one year's historical migration data previous to the 2006 migration. These stocks originate in drainages of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through the tag identification and monitored at Lower Granite Dam. In addition, seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling chinook salmon and the steelhead trout runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead trout forecasted to Rock Island, McNary, John Day, and Bonneville Dams.

Griswold, Jim

2007-01-01T23:59:59.000Z

457

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.  

SciTech Connect (OSTI)

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery techn

Hooley, Sharon

2009-03-20T23:59:59.000Z

458

Microsoft Word - Haxtun FINAL EA.docx  

Broader source: Energy.gov (indexed) [DOE]

FINAL FINAL ENVIRONMENTAL ASSESSMENT FOR HAXTUN WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Region JANUARY 2012 DOE/EA-1812 FINAL ENVIRONMENTAL ASSESSMENT FOR HAXTUN WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Region JANUARY 2012 DOE/EA-1812 iii January 2012 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Environmental Assessment for Haxtun Wind Energy Project, Logan and Phillips Counties,

459

Cape Wind Energy Project - Final EIS  

Broader source: Energy.gov (indexed) [DOE]

0 0 Environmental Impact Statement for the Proposed Cape Wind Energy Project Nantucket Sound, Offshore of Massachusetts Final Environmental Impact Statement U.S. Department of the Interior, MMS EIS-EA, OCS Publication No. 2008-040, OCS EIS/EA MMS 2010-11 and OCS EIS/EA BOEMRE 2011-024 Adopted as DOE/EIS-0470 U.S. Department of Energy December 2012 Page 1 of 3 Lead Federal Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed Cape Wind Energy Project, Nantucket Sound, Massachusetts (Adopted), DOE/EIS-0470 Contact: For additional copies or more information on this Final Environmental Impact Statement (EIS), please contact: Mr. Todd Stribley U.S. Department of Energy Loan Programs Office, LP-10

460

Paducah DUF6 Conversion Final EIS - Appendix G: Consultation Letters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS APPENDIX G: CONSULTATION LETTERS Consultation Letters G-2 Paducah DUF 6 Conversion Final EIS Consultation Letters G-3 Paducah DUF 6 Conversion Final EIS U.S. DEPARTMENT OF ENERGY LETTERS TO STATE AGENCIES AND RECOGNIZED NATIVE AMERICAN GROUPS Consultation Letters G-4 Paducah DUF 6 Conversion Final EIS Consultation Letters G-5 Paducah DUF 6 Conversion Final EIS Consultation Letters G-6 Paducah DUF 6 Conversion Final EIS Consultation Letters G-7 Paducah DUF 6 Conversion Final EIS Consultation Letters G-8 Paducah DUF 6 Conversion Final EIS Consultation Letters G-9 Paducah DUF 6 Conversion Final EIS Consultation Letters G-10 Paducah DUF 6 Conversion Final EIS Consultation Letters G-11 Paducah DUF 6 Conversion Final EIS Consultation Letters G-12 Paducah DUF 6 Conversion Final EIS

Note: This page contains sample records for the topic "gorge dam final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Cameron LNG LLC Final Order | Department of Energy  

Energy Savers [EERE]

Cameron LNG LLC Final Order Cameron LNG LLC Final Order FE Dkt. No. 11-162-LNG - Order 3391-A The Final Opinion and Order Granting Long-term Multi-contract Authorization to Export...

462

2006 Long Range Development Plan Final Environmental Impact Report  

E-Print Network [OSTI]

Vol: Reduced Vol: 112 399 PCE Adj: MLF Adj: Final Vol. :Vol: Reduced Vol: 186 203 PCE Adj: MLF Adj: Final Vol. :Reduct Vol: Reduced Vol: 137 PCE Adj: MLF Adj: Final Vol. :

Philliber, Jeff

2007-01-01T23:59:59.000Z

463

Dismantling the Final B53 Bomb | Department of Energy  

Energy Savers [EERE]

Dismantling the Final B53 Bomb Dismantling the Final B53 Bomb October 25, 2011 - 5:39pm Addthis Two Pantex Plant employees examine the final B53 bomb prior to its dismantling. |...

464

Microsoft Word - Final MR AL.doc | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Final MR AL.doc Microsoft Word - Final MR AL.doc Microsoft Word - Final MR AL.doc More Documents & Publications DOE F 4220.23 Weighted Guidelines Weighted Guidelines...

465

Win32API Interceptor Final Report Win32API Interceptor  

E-Print Network [OSTI]

Win32API Interceptor Final Report Win32API Interceptor A Microsoft Windows API function calls Interception application Final Report 1 #12;Win32API Interceptor Final Report Table of contents Table...................................................................................................... 15 Win32API Interceptor

Segall, Adrian

466

Volume I Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Volume I Volume I Final Environmental Impact Statement for the Searchlight Wind Energy Project NVN-084626 and NVN-086777 Bureau of Land Management Las Vegas Field Office in cooperation with Western Area Power Administration National Park Service December 2012 Searchlight Wind Energy Project FEIS Executive Summary Page | i Executive Summary The Final Environmental Impact Statement (FEIS) for the Searchlight Wind Energy Project is summarized in the following sections. This summary provides a general overview of the project and its purpose and need; briefly describes the Proposed Action and other alternatives; and summarizes major impacts for key resources. Searchlight Wind Energy, LLC, (the Applicant) a wholly-owned subsidiary of Duke Energy has applied

467

DE-NT0005667 Final Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Final Report Final Report October 2008 - September 2012 ASSESSING THE EFFICACY OF THE AEROBIC METHANOTROPHIC BIOFIL- TER IN METHANE HYDRATE ENVIRONMENTS Submitted by: University of California Santa Barbara CA 93106 Principal Investigator: David L. Valentine Prepared for: United States Department of Energy National Energy Technology Laboratory September 14, 2012 Office of Fossil Energy 1 TABLE OF CONTENTS Executive Summary 3 Publications Arising 4 Chapter 1: Methanotrophy in Microbial Mats 6 Chapter 2: Pelagic Methanotrophy: Studies from the Pacific Ocean 32 Chapter 3: Pelagic Methanotrophy: Studies from the Gulf of Mexico 72 Concluding Remarks 91 Acknowledgment 93 Disclaimer 93 LIST OF FIGURES

468

Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam: Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1997-1998 Annual Report.  

SciTech Connect (OSTI)

The authors report on their progress from April 1997 through March 1998 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), National Marine Fisheries Service (NMFS; Report D), U.S. Fish and Wildlife Service (USFWS; Report E), and Columbia River Inter-Tribal Fish Commission (CRITFC; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of the work from April 1997 through March 1998 listed.

Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

1999-02-01T23:59:59.000Z

469

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining