Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Ghana-REDD Readiness Requires Radical Reform | Open Energy Information  

Open Energy Info (EERE)

Readiness Requires Radical Reform Readiness Requires Radical Reform Jump to: navigation, search Name Ghana-REDD Readiness Requires Radical Reform Agency/Company /Organization UN-REDD Programme Sector Land Focus Area Forestry, Agriculture Topics Implementation, GHG inventory, Policies/deployment programs, Resource assessment, Pathways analysis, Background analysis Resource Type Maps, Guide/manual, Training materials Website http://environment.yale.edu/tf Country Ghana UN Region Western Africa References Ghana-REDD Readiness[1] Summary "The fundamental changes needed for sustainable forest management in Ghana have been known for years, and many large projects have been instigated accordingly. Yet real change has proved elusive. The key challenge now is to get REDD-plus right so that it makes a difference. Dialogue participants

2

DOE Zero Energy Ready Home National Program Requirements (Rev. 04)  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Zero Energy Ready Home National Program Requirements (Rev. 04), April 21, 2014.

3

Guam- Solar-Ready Residential Building Requirement  

Broader source: Energy.gov [DOE]

Note: Guam is in the process of adopting a [www.guamenergy.com/outreach-education/guam-tropical-energy-code/ tropical energy code]. As a result, the solar ready provisions described below may...

4

A Qualitative Readiness-Requirements Assessment Model for Enterprise Big-Data Infrastructure Investment  

SciTech Connect (OSTI)

In the last three decades, there has been an exponential growth in the area of information technology providing the information processing needs of data-driven businesses in government, science, and private industry in the form of capturing, staging, integrating, conveying, analyzing, and transferring data that will help knowledge workers and decision makers make sound business decisions. Data integration across enterprise warehouses is one of the most challenging steps in the big data analytics strategy. Several levels of data integration have been identified across enterprise warehouses: data accessibility, common data platform, and consolidated data model. Each level of integration has its own set of complexities that requires a certain amount of time, budget, and resources to implement. Such levels of integration are designed to address the technical challenges inherent in consolidating the disparate data sources. In this paper, we present a methodology based on industry best practices to measure the readiness of an organization and its data sets against the different levels of data integration. We introduce a new Integration Level Model (ILM) tool, which is used for quantifying an organization and data system s readiness to share data at a certain level of data integration. It is based largely on the established and accepted framework provided in the Data Management Association (DAMA-DMBOK). It comprises several key data management functions and supporting activities, together with several environmental elements that describe and apply to each function. The proposed model scores the maturity of a system s data governance processes and provides a pragmatic methodology for evaluating integration risks. The higher the computed scores, the better managed the source data system and the greater the likelihood that the data system can be brought in at a higher level of integration.

Olama, Mohammed M [ORNL] [ORNL; McNair, Wade [ORNL] [ORNL; Sukumar, Sreenivas R [ORNL] [ORNL; Nutaro, James J [ORNL] [ORNL

2014-01-01T23:59:59.000Z

5

Emergency Readiness Assurance Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.

1992-02-27T23:59:59.000Z

6

Readiness Review | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is documented on a Readiness Review Activity Approval Form. Once the agreed upon conditions and requirements are met the review is finalized through Operational Approval...

7

DOE Zero Energy Ready Home Consolidated Renewable Energy Ready...  

Energy Savers [EERE]

Consolidated Renewable Energy Ready Checklist DOE Zero Energy Ready Home Consolidated Renewable Energy Ready Checklist All homes certified as DOE Zero Energy Ready Homes must meet...

8

Readiness Review Program  

Broader source: Energy.gov (indexed) [DOE]

Review Program Review Program FUNCTIONAL AREA GOAL: DOE/NNSA Headquarters and Field organizations and their contractors responsible for the startup and operation of nuclear facilities have defined and implemented contractual requirements to manage, evaluate, and approve the startup and restart of nuclear facilities and activities. REQUIREMENTS:  DOE Order 425.1C, Startup and Restart of Nuclear Facilities  DOE P 450.4, Safety Management System Policy  DOE/NNSA Safety Management Functions, Responsibilities and Authorities Manual Guidance:  DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews  DOE-HDBK- 3012-2003, Operational Readiness Review Team Leaders Handbook  DOE G 450.4-1B, Integrated Safety Management System Guide

9

Community Readiness Project Helps State Get Ready for Electric...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Community Readiness Project Helps State Get Ready for Electric Vehicles Community Readiness Project Helps State Get Ready for Electric Vehicles April 10, 2013 - 12:00am Addthis In...

10

Technology Readiness Assessment Report  

Broader source: Energy.gov [DOE]

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

11

Beamline Commissioning Readiness Review Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ES&H and User Safety Officer T. Kruy AES Front Ends Readiness G. Markovich AES PSS & EPS Readiness M. Merritt AES Insertion Device Readiness M. Ramanathan AES CCSM & Chair AES...

12

TECHNOLOGY READINESS ASSESSMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

13

Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

2011-09-15T23:59:59.000Z

14

DOE Zero Energy Ready Home Case Study: Green Extreme Homes & Carl Franklin Homes, Garland, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Garland, TX, that was the first retrofit home certified to the DOE Zero Energy Ready home requirements. The construction team achieved a...

15

Technology Readiness Assessments | Department of Energy  

Office of Environmental Management (EM)

Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download August 1, 2013 Technology Readiness Assessment (TRA)Technology Maturation Plan...

16

Construction Readiness RM  

Broader source: Energy.gov (indexed) [DOE]

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

17

What's Your PEV Readiness Score? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

What's Your PEV Readiness Score? What's Your PEV Readiness Score? What's Your PEV Readiness Score? February 14, 2013 - 10:30am Addthis PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. Shannon Brescher Shea Communications Manager, Clean Cities Program What does this project do? Clean Cities works to reduce U.S. reliance on petroleum in transportation by establishing local coalitions of public- and

18

Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

19

DOE Zero Energy Ready Home Resources  

Broader source: Energy.gov [DOE]

DOE Zero Energy Ready Home provides resources for successfully building and selling zero-energy ready homes in today's market.

20

Lightning Arrestor Connectors Production Readiness  

SciTech Connect (OSTI)

The Lightning Arrestor Connector (LAC), part M, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of the LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.

Marten, Steve; Linder, Kim; Emmons, Jim; Gomez, Antonio; Hasam, Dawud; Maurer, Michelle

2008-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Webinar: Marketing and Sales Solutions for Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

22

Readiness Review RM  

Broader source: Energy.gov (indexed) [DOE]

Readiness Review Module Readiness Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Readin Rev Critical Decis CD-2 M ONMENTAL Review Plan ness Rev view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) view e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-

23

Readiness Review Training - Member | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Member Member Readiness Review Training - Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member. Topics include: An understanding of the background behind the Readiness Review Process; Training in the mechanics of performance and reporting of a Readiness Review; Knowledge of current DOE Orders, Directives, and References for the Readiness Review process; Training in Performance-Based Assessment Processes and Official DOE Team Member Readiness Review Training Methods Readiness Review Training - Member More Documents & Publications Readiness Review Training - Team Leader Readiness Review Training - Development of Criteria And Review Approach Documents

24

Ready, set, go . . . well maybe  

E-Print Network [OSTI]

at the 2011 Applied Ergonomics Conference By Melaniesustainable? Case study of ergonomics program that was notwas not! Case study of ergonomics program that was ready

Alexandre, Melanie M

2011-01-01T23:59:59.000Z

25

Clean Cities: Electric Vehicle Community Readiness Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financial Opportunities Financial Opportunities Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Projects to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Projects on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Projects on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Projects on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Projects on AddThis.com... Current Opportunities Related Opportunities Funded Projects Recovery Act Projects Community Readiness Projects Alternative Fuel Market Projects

26

Solar Ready: An Overview of Implementation Practices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that solar ready itself does not reduce energy use or replace conventional energy with green energy. Solar ready does not contribute toward carbon emissions reduction until...

27

Wind Offshore Port Readiness | Department of Energy  

Office of Environmental Management (EM)

Wind Offshore Port Readiness Wind Offshore Port Readiness This study will aid decision-makers in making informed decisions regarding the choice of ports for specific offshore...

28

Readiness Review Training - Member | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member....

29

Marine & Hydrokinetic Technology Readiness Initiative TIDAL ENERGY...  

Office of Scientific and Technical Information (OSTI)

Marine & Hydrokinetic Technology Readiness Initiative TIDAL ENERGY SYSTEM FOR ON-SHORE POWER GENERATION Marine & Hydrokinetic Technology Readiness Initiative DE-EE0003636 TIDAL...

30

Question and Answers Alternative Fuel Readiness Plans  

E-Print Network [OSTI]

Question and Answers Alternative Fuel Readiness Plans PON-13-603 September 3, 2013 Eligibility Q1 to readiness plans? A1 This solicitation is limited to readiness planning only for alternative fuels. Q2 In regards to PON-13-603 - Alternative Fuel Readiness Plans, is electricity used for transportation

31

Physical Activity Readiness Medical Examination  

E-Print Network [OSTI]

Conveyance/Referral: NAME ______________________________________________________ ADDRESS or prescribed exercise. · Physical Activity Readiness Conveyance/Referral Form - an optional tear-off tab for the physician to convey clearance for physical activity participation, or to make a referral to a medically

Waterloo, University of

32

Hydrogen Infrastructure Market Readiness Workshop  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) hosted the Hydrogen Infrastructure Market Readiness Workshop February 1617, 2011, in Washington, D.C....

33

An Overview of Readiness for REDD: A compilation of readiness activities  

Open Energy Info (EERE)

An Overview of Readiness for REDD: A compilation of readiness activities An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Jump to: navigation, search Tool Summary LAUNCH TOOL Name: An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Agency/Company /Organization: The Woods Hole Research Center Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: www.cbd.int/forest/doc/overview-readiness-redd.pdf An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Screenshot References: Overview of REDD[1] Background "This background document aims to provide a snapshot view of readiness

34

NGNP Infrastructure Readiness Assessment: Consolidation Report  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

Brian K Castle

2011-02-01T23:59:59.000Z

35

Verification of Readiness to Start Up or Restart Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Cancels DOE O 425.1C. Adm Chg 1, dated 4-2-13.

2010-04-16T23:59:59.000Z

36

AT&TConsulting HITECH Security Readiness Assessment Bundle  

E-Print Network [OSTI]

regarding the safeguarding of Protected Health Information (PHI). Approach Upon engagement with AT Rule - Administrative Safeguards (164.308) - Physical Safeguards (164.310) Benefits · Cost · Readiness Report Product Brief #12;- Technical Safeguards (164.312) - Organizational Requirements (164

Fisher, Kathleen

37

Clean Cities: Electric Vehicle Community Readiness Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Workshop to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Workshop on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Workshop on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Workshop on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Workshop on AddThis.com... Conferences & Workshops Clean Cities 20th Anniversary Electric Vehicle Community Readiness Stakeholder Summit Waste-to-Wheels Plug-In Vehicle & Infrastructure

38

Zero Energy Ready Home Update Newsletter  

Broader source: Energy.gov [DOE]

Welcome to Zero Energy Ready Home Updateyour connection to news from the U.S. Department of Energys Zero Energy Ready Home program, which supports housing industry leaders with the tools...

39

DOE Order Self Study Modules - DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

5.1D 5.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES DOE O 425.1D Familiar Level June 2011 1 DOE O 425.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. What is the purpose of DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities? 2. What are the requirements for determining the level of readiness review [operational readiness reviews (ORRs) and readiness assessments (RAs)]? 3. What are the requirements for determining the startup authorization authority? 4. What are the requirements for startup notification reports?

40

Solar Ready: An Overview of Implementation Practices  

SciTech Connect (OSTI)

This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Digital Forensic Readiness: Are We There Yet?  

E-Print Network [OSTI]

Digital Forensic Readiness: Are We There Yet? Antonis Mouhtaropoulos, Chang-Tsun Li Department.co.za Abstract--Digital Forensic Readiness is defined as the pre- incident plan that deals with an organization for a common forensic readiness standard. This article reviews a number of key initiatives in order to point

Li, Chang-Tsun

42

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR  

Broader source: Energy.gov (indexed) [DOE]

DOE O 425.1D, VERIFICATION OF READINESS TO START UP DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and 3) the startup notification report. In the second section we will discuss 1) the requirements applicable to DOE ORRs and DOE RAs, and 2) the core requirements. In the third section we will discuss the 1) requirements for DOE field element and headquarters line management oversight of the startup or restart process, 2) requirements for the records management program, and

43

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

44

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

45

ZERH Webinar: Energy- and Water- Efficiency in the DOE Zero Energy Ready Home Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

46

Solar Ready Buildings Planning Guide  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

78 78 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

47

Solar Ready Buildings Planning Guide  

Broader source: Energy.gov (indexed) [DOE]

6078 6078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

48

Operational Readiness Review: Savannah River Replacement Tritium Facility  

SciTech Connect (OSTI)

The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

Not Available

1993-02-01T23:59:59.000Z

49

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network [OSTI]

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

50

Organizational Readiness in Specialty Mental Health Care  

E-Print Network [OSTI]

readiness for change (ORC) measure, and key stake- holders43 clinical staff completed the ORC, and 38 key stakeholdersdeviations (SDs) of the ORC scores are also illuminating in

Hamilton, Alison B.; Cohen, Amy N.; Young, Alexander S.

2010-01-01T23:59:59.000Z

51

ORISE: Asset Readiness Management System (ARMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

52

Hydrogen Infrastructure Market Readiness Workshop Agenda | Department...  

Broader source: Energy.gov (indexed) [DOE]

Market Readiness Workshop, hosted by the U.S. Department of Energy's National Renewable Energy Laboratory, February 16-17, 2011, in Washington, DC. wkshpmarketreadinessagenda....

53

Hydrogen Infrastructure Market Readiness: Opportunities and Potential...  

Broader source: Energy.gov (indexed) [DOE]

Opportunities and Potential for Near-term Cost Reductions. Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the...

54

DOE Challenge Home Consolidated Renewable Energy Ready Checklist  

Broader source: Energy.gov (indexed) [DOE]

Consolidated Consolidated Renewable Energy Ready Checklist DOE Challenge Home National Program Requirements Mandatory Requirement 7 (Renewable Ready) shall be met by any home certified under the DOE Challenge Home program, only where all three conditions of the following conditions are met: 1. Location, based on zip code has at least 5 kWh/m 2 /day average daily solar radiation based on annual solar insolation using PVWatts online tool: http://gisatnrel.nrel.gov/PVWatts_Viewer/index.html AND; 2. Location does not have significant natural shading (e.g., trees, tall buildings on the south- facing roof, AND; 3. Home as designed has adequate free roof area within +/-45° of true south as noted in the table below. Note that in some cases a house may have insufficient roof area for the Solar

55

Verification of Readiness to Start Up or Restart Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Cancels DOE O 425.1C. Adm Chg 1, dated 4-2-13, cancels DOE O 425.1D.

2010-04-16T23:59:59.000Z

56

DOE Zero Energy Ready Home Verification | Department of Energy  

Energy Savers [EERE]

Verification DOE Zero Energy Ready Home Verification DOE Zero Energy Ready Homes Verification, a publication of the U.S. Department of Energy Zero Energy Ready Homes program. DOE...

57

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network [OSTI]

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas Inc agency thereof. #12;1 RSB Certification Readiness Study: Hawaii Biofuel Projects Prepared For Hawaii

58

Project Get Ready | Open Energy Information  

Open Energy Info (EERE)

Get Ready Get Ready Jump to: navigation, search Name Project Get Ready Agency/Company /Organization Rocky Mountain Institute Sector Energy Focus Area Transportation Topics Implementation Resource Type Dataset Website http://projectgetready.com/ Equivalent URI http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator-0, http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator References [1] Abstract The calculator allows individuals to consider the purchase cost (including financing) and the fuel cost of electric vehicles compared to conventional vehicles over a lifetime of 15 years. Consumers should also consider driving habits, maintenance costs, insurance, resale value, and potential battery and charging infrastructure costs.

59

Hawaii Gets 'EV Ready' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Gets 'EV Ready' Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program By 2030, the Hawaii Clean Energy Initiative will:

60

Hawaii Gets 'EV Ready' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Technology Readiness Assessments | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Management » Tank Waste and Waste Processing » Waste Management » Tank Waste and Waste Processing » Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download January 1, 2012 Compilation of TRA Summaries A compilation of all TRA Summaries November 1, 2011 Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download November 1, 2009 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download

62

Robertsons Ready Mix | Open Energy Information  

Open Energy Info (EERE)

Robertsons Ready Mix Robertsons Ready Mix Jump to: navigation, search Name Robertsons Ready Mix Facility Robertsons Ready Mix Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Robertsons Ready Mix Location Cabazon CA Coordinates 33.915842°, -116.81325° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.915842,"lon":-116.81325,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

Planning and Conducting Readiness Reviews  

Broader source: Energy.gov (indexed) [DOE]

3006-2010 3006-2010 ________________________ Superseding DOE-STD-3006-2000 June 2000 DOE STANDARD PLANNING AND CONDUCTING READINESS REVIEWS U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-YR i CONTENTS FOREWORD................................................................................................................................. 1

64

Advancing Technology Readiness: Wave Energy Testing and Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advancing Technology Readiness: Wave Energy Testing and Demonstration Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm Addthis Northwest...

65

DOE Zero Energy Ready Home Case Study: John Hubert Associates...  

Energy Savers [EERE]

Homes, Double Oak, TX DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study, Preferred Builders, Old Greenwich, CT, Custom...

66

Quality Management Systems for Zero Energy Ready Home Webinar...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version...

67

Energy -- and Water -- Efficiency in the DOE Zero Energy Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program Webinar (Text Version) Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program...

68

EV Community Readiness projects: Center for Transportation and...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: Center for Transportation and the Environment (GA, AL, SC); Centralina Council of Governments (NC) EV Community Readiness projects: Center for...

69

DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit...  

Energy Savers [EERE]

Old Greenwich, CT, Custom DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI...

70

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom...  

Energy Savers [EERE]

TX More Documents & Publications DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott...

71

DOE Zero Energy Ready Home Case Study: Caldwell and Johnson,...  

Broader source: Energy.gov (indexed) [DOE]

Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI Case study of a DOE Zero Energy Ready affordable home in...

72

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland...  

Office of Environmental Management (EM)

Old Greenwich, CT, Custom DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit Lake, Iowa DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI...

73

Readiness Review Training - Team Leader | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Leader November 10, 2010 Readiness Review Team Leader Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team leader....

74

Oregon: Advancing Technology Readiness: Wave Energy Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm...

75

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project...

76

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

ACCOMPLISHMENTS NYCLHVCC: Clean Cities 2011 EV Community Readiness DUANE Reade's Smith EV at Plug-In Day in Times Square Clean Cities 2011 Community Readiness & Planning...

77

Technology Readiness Levels for Advanced Nuclear Fuels and Materials Development  

SciTech Connect (OSTI)

The Technology Readiness Level (TRL) process is used to quantitatively assess the maturity of a given technology. The TRL process has been developed and successfully used by the Department of Defense (DOD) for development and deployment of new technology and systems for defense applications. In addition, NASA has also successfully used the TRL process to develop and deploy new systems for space applications. Advanced nuclear fuels and materials development is a critical technology needed for closing the nuclear fuel cycle. Because the deployment of a new nuclear fuel forms requires a lengthy and expensive research, development, and demonstration program, applying the TRL concept to the advanced fuel development program is very useful as a management and tracking tool. This report provides definition of the technology readiness level assessment process as defined for use in assessing nuclear fuel technology development for the Advanced Fuel Campaign (AFC).

Jon Carmack

2014-01-01T23:59:59.000Z

78

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES  

Broader source: Energy.gov [DOE]

"The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness...

79

Shovel Ready Energy Project Grants (Florida)  

Broader source: Energy.gov [DOE]

This program leverages Floridas state energy grant initiatives to identify shovel-ready projects that can be expeditiously implemented through available SEP funding. The goal is to provide...

80

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

Broader source: Energy.gov [DOE]

Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop held February 16-17, 2011. This presentation was disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop.

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NanoReady Ltd | Open Energy Information  

Open Energy Info (EERE)

NanoReady Ltd NanoReady Ltd Jump to: navigation, search Name NanoReady Ltd Place Caesarea, Israel Zip 38900 Sector Solar Product String representation "NanoReady devel ... nd solar cells." is too long. Coordinates 32.483311°, 34.89521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.483311,"lon":34.89521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

82

Connecting Ready-to-Work Americans with Ready-to-Be-Filled Jobs...  

Energy Savers [EERE]

and Louisiana Economic Development are ready to provide technical assistance and capacity building training to diverse businesses. My office and the Department of Commerce will...

83

DOE Zero Energy Ready Home National Program Requirements  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

The UA calculation shall be done using a method consistent with the ASHRAE Handbook of Fundamentals and shall include the thermal bridging effects of framing materials. The...

84

What Does Open-Data-Ready Look Like? Jeff Kaplan Senior Consultant, ICT Unit, Open ePolicy Solutions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Does Open-Data-Ready Does Open-Data-Ready Look Like? Jeff Kaplan - Senior Consultant, ICT Unit, Open ePolicy Solutions Email: jeff@openesolutions.com Twitter: @jeffkaplan88 Andrew Stott - UK Transparency Board, former UK Deputy CIO Email: andrew.stott@dirdigeng.com Twitter: @DirDigEng Workshop Intro 1. Workshop objective: Tool to assess readiness for an Open Data initiative 2. Why develop it? 3. How to develop it? 4. How to use it? Open Data Ecosystem Open Data Possible Readiness Categories Political leadership * Skills inside government * Skills outside government Policy & Legal Framework Financial requirements & funding * Organization & management in government * State of Data within government Demand for Data / Engagement Technical infrastructure requirements Reuse

85

Ready. Aim. Fire. | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ready. Aim. Fire. Ready. Aim. Fire. Ready. Aim. Fire. March 28, 2011 - 4:27pm Addthis John Lippert I wrote in a previous blog posting about using digital electric meters to locate "leaking" electricity-often referred to as phantom loads and vampire loads-and high electrical power consumption. In another posting I described what I'm doing to reach out in my community to get my neighbors to use these meters to locate wasteful electricity usage in their homes. Now my community will have another tool in its arsenal to combat energy waste: a thermal leak detector. Whereas the digital electric meter helps locate electricity leaks, the thermal leak detector helps locate-well, you guessed it-thermal (heat) leaks. Heating and cooling your home account for close to half of the energy use

86

An assessment of the value of retail ready packaging  

E-Print Network [OSTI]

Use of retail-ready packaging reduces the costs of replenishing store shelves by eliminating the labor of removing packaging materials and stocking individual items on shelves. While reducing costs for retailers, retail-ready ...

Jackson, Kathleen Anne

2008-01-01T23:59:59.000Z

87

Building America Top Innovations 2013 Profile - Zero Energy-Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Top Innovations 2013 Profile - Zero Energy-Ready Single-Family Homes Building America Top Innovations 2013 Profile - Zero Energy-Ready Single-Family Homes Many Building America...

88

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study: Mandalay Homes, Prescott Valley, AZ DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott Valley, AZ Case study of a DOE Zero Energy Ready home in northern AZ that...

89

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes December 18, 2014 12:00PM to 1:15PM EST...

90

DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix...  

Energy Savers [EERE]

Mandalay Homes, Phoenix, AZ, Affordable DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable Case study of a DOE Zero Energy Ready Home in Phoenix, AZ...

91

DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Garbett Homes, Herriman, UT, Production Home DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman, UT, Production Home Case study of a DOE Zero Energy Ready Home in...

92

DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Amerisips Homes, Charleston, SC DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston, SC Case study of a DOE Zero Energy Ready home on Johns Island in Charleston, SC,...

93

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom...  

Energy Savers [EERE]

Sterling Brook Custom Homes, Double Oak, TX DOE Zero Energy Ready Home Case Study: Sterling Brook Custom Homes, Double Oak, TX Case study of a DOE Zero Energy Ready home in Double...

94

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland...  

Energy Savers [EERE]

Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI Case study of a DOE Zero Energy Ready home in Midland, MI, that scored HERS 49...

95

Perceived Readiness for Practice of Senior Baccalaureate Nursing Students  

E-Print Network [OSTI]

experiences. This mixed method study examined the psychometric properties of a readiness for practice tool, and explored the effects of a clinical internship experience on the perception of readiness for practice of 483 senior baccalaureate nursing students...

Reagor, Janet

2010-04-20T23:59:59.000Z

96

ENERGY STAR Webinar: Zero Energy Ready Home Program | Department...  

Broader source: Energy.gov (indexed) [DOE]

home is as good as ENERGY STAR, the modest added "lift" to bring a home up to DOE's Zero Energy Ready specs unleashes a wave of powerful value messages. DOE Zero Energy Ready...

97

DOE Zero Energy Ready Home Case Study: Brookside Development...  

Energy Savers [EERE]

Preferred Builders, Old Greenwich, CT, Custom DOE Zero Energy Ready Home Case Study: AquaZephyr, Ithaca, NY DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI...

98

New DOE Report Investigates Port Readiness for Offshore Wind...  

Energy Savers [EERE]

New DOE Report Investigates Port Readiness for Offshore Wind New DOE Report Investigates Port Readiness for Offshore Wind October 1, 2013 - 1:22pm Addthis This is an excerpt from...

99

DOE Zero Energy Ready Home Case Study: Greenhill Contracting...  

Energy Savers [EERE]

Study: Greenhill Contracting, New Paltz, NY DOE Zero Energy Ready Home Case Study: Greenhill Contracting, New Paltz, NY Case study of a DOE Zero Energy Ready home in New Paltz, NY,...

100

Zero Energy Ready Home Events | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Zero Energy Ready Home Events Zero Energy Ready Home Events February 2015 < prev next > Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 ZERH Webinar: High-Performance Home Sales Training...

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE Zero Energy Ready Home Case Study, Caldwell and Johnson,...  

Office of Environmental Management (EM)

Study, Caldwell and Johnson, Exeter, RI, Custom Home DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home Case study of a DOE Zero Energy Ready Home...

102

Is Vietnam Ready for Nuclear Power?  

Science Journals Connector (OSTI)

Is Vietnam Ready for Nuclear Power? ... Currently the worlds largest nuclear power market exists in emerging economies and developing countries as those countries are in great need of relatively cheap energy to drive its economic growth. ... But nuclear power, neither cheap nor safe, is putting those countries in a dilemma. ...

Changjian Wang; Qiang Wang; Fei Wang

2012-04-27T23:59:59.000Z

103

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network [OSTI]

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable (item 2) Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas: Hawaii Biofuel Projects Prepared For Hawaii Natural Energy Institute School of Ocean Earth Sciences

104

Shale oil processes ready for commercialization  

Science Journals Connector (OSTI)

Shale oil processes ready for commercialization ... However, Lurgi has been in the shale processing business by itself since the 1930s, and hopes to capitalize on this experience. ... Lurgi developed the Lurgi-Ruhrgas (LR) process in concert with Ruhrgas with an eye on the U.S. shale oil markets of the future. ...

1982-04-12T23:59:59.000Z

105

Global e-Readiness - For What? Readiness for e-Banking (JITD)  

E-Print Network [OSTI]

With the rapid diffusion of the Internet worldwide, there has been considerable interest in the e-potentials of developing countries giving rise to a 1st generation of e-Readiness studies. Moreover, ...

Maugis, V.

2004-12-10T23:59:59.000Z

106

DOE-STD-3006-95; DOE Standard Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

3006-95 3006-95 November 1995 SUPERSEDING DOE-STD-3006-93 November 1993 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. DOE-STD-3006-95 i PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) FOREWORD 1. DOE 0 425.1 establishes the requirement to conduct Operational Readiness Reviews

107

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ethiopia UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

108

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

109

Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

Facilitating Implementation and Readiness for Mitigation (FIRM) Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica, Ethiopia, Ghana, Indonesia, Mexico, Morocco, Senegal, South Africa, Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

110

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM)  

Open Energy Info (EERE)

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

111

South Africa-Facilitating Implementation and Readiness for Mitigation  

Open Energy Info (EERE)

South Africa-Facilitating Implementation and Readiness for Mitigation South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Name South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country South Africa UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

112

Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop to someone by E-mail Share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Facebook Tweet about Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Twitter Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Google Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Delicious Rank Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Digg Find More places to share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on AddThis.com... Conferences & Workshops

113

Vehicle Technologies Office: Community and Fleet Readiness  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Community and Fleet Readiness Community and Fleet Readiness As researchers work to lower the costs and increase the convenience of plug-in electric vehicles (PEVs), it's also necessary to make similar strides on the local level. State and local incentives, such as tax credits or access to HOV lanes, can encourage consumers and vehicle fleets to purchase PEVs. In contrast, difficult permitting procedures for chargers or a lack of signage can discourage adoption. To help communities prepare themselves for plug-in and other alternative fuel vehicles, the Office works with nearly 100 Clean Cities coalitions across the country. Clean Cities offers a wide variety of resources to cities and regions that want to encourage citizens and businesses to drive PEVs. They also offer resources to both public and private fleets that wish to adopt these vehicles.

114

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen Infrastructure Market Readiness Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results Marc Melaina, PhD Hydrogen Technologies and Systems Center, NREL Distributed electronically to workshop attendees for review March 24, 2011 Goal of this presentation * This presentation is being disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop * This feedback will be compiled in a final report * We would like to accomplish two things with these slides: 1. Share the preliminary results with participants 2. Get your feedback now on any corrections or omissions * We are still open to receiving additional feedback on the workshop topic, but will report it as having been received outside of the workshop if it is included in the final report

115

Certified Sites (Ready! Set! Build!) (Wisconsin) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) < Back Eligibility Agricultural Developer General Public/Consumer Institutional Low-Income Residential Nonprofit Residential Rural Electric Cooperative Schools State/Provincial Govt Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Training/Technical Assistance Siting and Permitting Provider Wisconsin Economic Development Corporation WEDC has created, in partnership with Deloitte Consulting (Site Selector Consultant) and community partners, the Ready! Set! Build! Program, which provides consistent standards for industrial site certification in

116

The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

for Market Readiness (PMR) for Market Readiness (PMR) Jump to: navigation, search Logo: The World Bank Partnership for Market Readiness (PMR) - Brazil Name The World Bank Partnership for Market Readiness (PMR) - Brazil Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs Website http://wbcarbonfinance.org/Rou

117

Jasper Johns in der Nachfolge des Ready-mades.  

E-Print Network [OSTI]

??Die Arbeit untersucht, wie die Einfhrung des Ready-mades in die Kunstwelt die Arbeitsweise von Knstlern sowie die Produktion und Wahrnehmung von Kunstwerken beeinflusst hat. Dies (more)

Mayer, Lynette Mildred

2013-01-01T23:59:59.000Z

118

Accelerating the Electrification of U.S. Drive Trains: Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Accelerating the Electrification of U.S. Drive Trains: Ready and Affordable Technology Solutions for Domestically Manufactured Advanced...

119

Readiness Review Training - Development of Criteria And Review...  

Broader source: Energy.gov (indexed) [DOE]

Documents November 8-9, 2010 Readiness Review Training - Development of Criteria And Review Approach Documents Topics include: Implementation Plan IP Approval Content of IP IP...

120

Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan  

Broader source: Energy.gov [DOE]

The REVi plan addresses the electric vehicle market in Richmond and then addresses a regional plan, policies, and analysis of the the communities readiness.

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville...  

Energy Savers [EERE]

Southern Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL Case study of the first manufactured home built to the DOE Zero Energy...

122

Zero Energy Ready Home - 2014 BTO Peer Review | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Zero Energy Ready program, formerly known as the DOE Challenge Home program, is to transform the housing market to high-performance homes. These homes are extremely energy...

123

DOE Zero Ready Home Case Study: Cobblestone Homes, 2014 Model...  

Energy Savers [EERE]

designed in to give you superior construction, durability, and comfort; healthy indoor air; high-performance HVAC, lighting, and appliances; and solar-ready components for low...

124

EV Community Readiness projects: American Lung Association of...  

Broader source: Energy.gov (indexed) [DOE]

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ti027kelly2013o.pdf More Documents & Publications EV Community Readiness projects: Center for...

125

Communities Plug In To Electric Vehicle Readiness | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

electric vehicle readiness projects from throughout the country. | Photo by Ken Kelly, National Renewable Energy Laboratory EV Everywhere: 10 Ways Communities Can Pave the...

126

Colorado Community Readiness Efforts for PEVs Support State Policy...  

Energy Savers [EERE]

electric vehicle readiness projects from throughout the country. | Photo by Ken Kelly, National Renewable Energy Laboratory EV Everywhere: 10 Ways Communities Can Pave the...

127

EV Community Readiness projects: Clean Energy Coalition (MI)...  

Broader source: Energy.gov (indexed) [DOE]

Clean Energy Coalition (MI); Clean Fuels Ohio EV Community Readiness projects: Clean Energy Coalition (MI); Clean Fuels Ohio 2013 DOE Hydrogen and Fuel Cells Program and Vehicle...

128

EV Community Readiness projects: Delaware Valley Regional Planning...  

Broader source: Energy.gov (indexed) [DOE]

Delaware Valley Regional Planning Commission (PA); Metropolitan Energy Information Center, Inc. (KS, MO) EV Community Readiness projects: Delaware Valley Regional Planning...

129

DOE Zero Energy Ready Home Case Study: Southern Energy Homes...  

Office of Environmental Management (EM)

Southern Energy Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL Case study of the first manufactured home built to the DOE...

130

DOE Zero Energy Ready Home Webinar: Building Energy Optimization...  

Broader source: Energy.gov (indexed) [DOE]

Building Energy Optimization (BEopt) Software DOE Zero Energy Ready Home Webinar: Building Energy Optimization (BEopt) Software This webinar was presented on May 15, 2014 and gives...

131

Technology Readiness Assessment (TRA)/Technology Maturation Plan...  

Broader source: Energy.gov (indexed) [DOE]

(TRA)Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This document is a guide for those...

132

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Office of Environmental Management (EM)

2 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download...

133

Guidelines for Participating in the DOE Zero Energy Ready Home...  

Broader source: Energy.gov (indexed) [DOE]

builders for their leadership in increasing energy efficiency, improving indoor air quality, and making homes zero energy ready. The program builds upon the comprehensive...

134

Building America Zero Energy Ready Home Case Study: Imery Group...  

Broader source: Energy.gov (indexed) [DOE]

Imery Group, Proud Green Home, Serenbe GA Building America Zero Energy Ready Home Case Study: Imery Group, Proud Green Home, Serenbe GA Case study describing the first...

135

EV Community Readiness projects: Clean Energy Coalition (MI...  

Broader source: Energy.gov (indexed) [DOE]

link the Michigan PEV Community Readiness Plan to relevant websites and other appropriate media outlets; incorporate the Plan into the PEV Taskforce website. Clean Cities Recovery...

136

DOE Zero Energy Ready Home: Better Business for Builders Webinar...  

Broader source: Energy.gov (indexed) [DOE]

Better Business for Builders Webinar Transcript DOE Zero Energy Ready Home: Better Business for Builders Webinar Transcript Below is the text version of the webinar, DOE Zero...

137

South Africa-Facilitating Implementation and Readiness for Mitigation...  

Open Energy Info (EERE)

and Readiness for Mitigation (FIRM)" Retrieved from "http:en.openei.orgwindex.php?titleSouthAfrica-FacilitatingImplementationandReadinessforMitigation(FIRM)&oldid70000...

138

Readiness Issues for Emergency Response Instrumentation  

SciTech Connect (OSTI)

Issues in maintaining readiness of instruments for deployment and use in emergency response situation often differ from those in maintaining instruments for normal operations. Confunding circumstances include use of non-availability of check sources, ensuring instruments are always in calibration and operable, possible use of instruments in different climates, packaging of instrumentation for deployment, transport of instrumentation and check sources, and ensuring users are familiar with instruments. Methods and procedures for addressing these issues are presented. Instrumentation used for survey, in situ measurements, electronic dosimetry, and air conditioning are discussed.

C.A. Riland; D.R. Bowman; R.J. Tighe

1999-03-01T23:59:59.000Z

139

DOE Challenge Home (Now Zero Energy Ready Home)- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes DOEs Builders Challenge. Hundreds of leading-edge builders across the country signed on to the Challenge and more than 14,000 homes earned the label, saving homeowners over $10 million a year in utility bills. DOEs new program, the DOE Challenge Home, increases the rigor of the guidelines including requiring homes to be Zero Net-Energy Ready.

140

SCS-2005-18 Roundup Ready Flex Cotton System  

E-Print Network [OSTI]

SCS-2005-18 6-05 Roundup Ready Flex Cotton System Robert Lemon, Ph.D., Professor and Extension Agronomist - Cotton Randy Boman, Ph.D., Associate Professor and Extension Agronomist - Cotton Todd Baughman Specialist Peter Dotray, Ph.D., Professor and Extension Weed Specialist R oundup Ready Flex cotton provides

Mukhtar, Saqib

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Designing and Building Houses that are Solar Ready  

Broader source: Energy.gov [DOE]

Builders considering adding photovoltaic (PV) systems to new houses after initial construction is completed can save time and money by following new house Solar Ready design guidelines. Solar Ready houses are designed and built with integrated electrical and mechanical features that streamline the integration of PV systems.

142

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Morocco UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

143

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Performs Tenth Technology Readiness Assessment Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

144

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

145

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

146

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ghana UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

147

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Mexico UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

148

Rough and Ready Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

and Ready Biomass Facility and Ready Biomass Facility Jump to: navigation, search Name Rough and Ready Biomass Facility Facility Rough and Ready Sector Biomass Owner Rough and Ready Lumber Co. Location Cave Junction, Oregon Coordinates 42.1628912°, -123.6481235° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.1628912,"lon":-123.6481235,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

149

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston...  

Office of Environmental Management (EM)

Midland, MI DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home...

150

DOE handbook: Guide to good practices for operational readiness reviews (ORR) team leader`s guide  

SciTech Connect (OSTI)

This guidance section provides instructions, explanations and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the Team Leader (TL), Team Members (TM) and Review Coordinator (RC) are outlined. An appendix contains sample forms and correspondence which are typically used to initiate and perform the ORR. Although this document was written specifically for use by DOE ORR Team Leaders, its use may also be beneficial to contractor ORR Team Leaders. The handbook is also useful for Team Leaders of Readiness Assessments conducted in accordance with requirements of DOE O 425.1. Lessons learned, which are promulgated with this handbook, will benefit any line manager, particularly those preparing a facility or process for startup or restart.

NONE

1994-09-01T23:59:59.000Z

151

Property:Technology Readiness Level | Open Energy Information  

Open Energy Info (EERE)

Readiness Level Readiness Level Jump to: navigation, search Property Name Technology Readiness Level Property Type Text Pages using the property "Technology Readiness Level" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/Aegir Dynamo + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/AirWEC + TRL 5/6: System Integration and Technology Laboratory Demonstration MHK Technologies/Anaconda bulge tube drives turbine + TRL 4 Proof of Concept MHK Technologies/AquaBuoy + TRL 1-3: Discovery / Concept Definition / Early Stage Development & Design & Engineering MHK Technologies/Aquantis + TRL 1 3 Discovery Concept Def Early Stage Dev Design Engineering

152

Energy Department Staff Ready for Hurricane Earl | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl September 3, 2010 - 12:00pm Addthis Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability What does this mean for me? You can review updated information on the Energy Department's response efforts, including critical energy infrastructure impacted by the storm and outage and restoration data, through the Emergency Situation Reports. As Category 4 Hurricane Earl heads towards the East Coast, Energy Department emergency responders are in place and ready to go at the National Response Coordination Center in Washington, D.C. and FEMA's Regional Response Coordination Centers in Boston and New York City. The

153

DOE Zero Energy Ready Home: Ventilation and Filtration Strategies...  

Broader source: Energy.gov (indexed) [DOE]

We have these homes so well-air-sealed, we need to look at things like good source control products. Obviously, these homes are so efficient, they're zero energy ready, we have...

154

Are Batteries Ready for Plug-in Hybrid Buyers?  

E-Print Network [OSTI]

237253. Burke, A. , 2007. Batteries and ultracapacitors forresults with lithium-ion batteries. In: Proceedings (CD)locate/tranpol Are batteries ready for plug-in hybrid

Axsen, Jonn; Burke, Andy; Kurani, Kenneth S

2010-01-01T23:59:59.000Z

155

Making existing production systems Industry 4.0-ready  

Science Journals Connector (OSTI)

This paper presents an approach to how existing production systems that are not Industry 4.0-ready can be expanded to participate in an Industry 4.0 factory. Within this paper, a concept ... systems can be discov...

Jan Schlechtendahl; Matthias Keinert; Felix Kretschmer

2014-10-01T23:59:59.000Z

156

DOE Zero Energy Ready Home Webinar: Ducts in Conditioned Space  

Broader source: Energy.gov [DOE]

DOE Challenge Home is a blueprint for zero energy ready homes. When we make that statement its impossible to justify huge thermal losses from ducts in unconditioned spaces. Thats why one of...

157

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT, MA, RI, CT, NY, NJ, PA, DE, MD, DC) EV Community...

158

DOE Zero Ready Home Case Study: Greenhill Contracting, The Preserve...  

Energy Savers [EERE]

Greenhill Contracting The Preserve New Paltz, NY DOE ZERO ENERGY READY HOME(tm) The U.S. Department of Energy invites home builders across the country to meet the extraordinary...

159

DOE Zero Energy Ready Home: Leganza Residence- Greenbank, Washington  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features structural insulated panel walls and roof, a 2-ton ground source heat pump, radiant floor heat, 7.1 kWh PV, and triple-pane windows.

160

Marketing and Sales Solutions for Zero Energy Ready Homes Webinar...  

Broader source: Energy.gov (indexed) [DOE]

of resources that we'll cover. The first are marketing resources that deal with the brand of Zero Energy Ready Home and how it was configured from the very beginning to...

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE Zero Energy Ready Home: Durable Energy Builders, Houston, Texas  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features super-insulated roof, 11,500 gallon rainwater cistern to supply most of the homes drinking water, hurricane-proof roof, and triple-pane windows.

162

DOE Zero Energy Ready Home Case Study: Green Extreme Homes &...  

Energy Savers [EERE]

Green Extreme Homes & Carl Franklin Homes, Garland, TX DOE Zero Energy Ready Home Case Study: Green Extreme Homes & Carl Franklin Homes, Garland, TX Case study of a DOE Zero Energy...

163

DOE Zero Energy Ready Home: Durable Energy Builders, Houston...  

Energy Savers [EERE]

super-insulated roof, 11,500 gallon rainwater cistern to supply most of the home's drinking water, hurricane-proof roof, and triple-pane windows. DOE Zero Energy Ready Home:...

164

LWRS ATR Irradiation Testing Readiness Status  

SciTech Connect (OSTI)

The Light Water Reactor Sustainability (LWRS) Program was established by the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. The LWRS Program is divided into four R&D Pathways: (1) Materials Aging and Degradation; (2) Advanced Light Water Reactor Nuclear Fuels; (3) Advanced Instrumentation, Information and Control Systems; and (4) Risk-Informed Safety Margin Characterization. This report describes an irradiation testing readiness analysis in preparation of LWRS experiments for irradiation testing at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) under Pathway (2). The focus of the Advanced LWR Nuclear Fuels Pathway is to improve the scientific knowledge basis for understanding and predicting fundamental performance of advanced nuclear fuel and cladding in nuclear power plants during both nominal and off-nominal conditions. This information will be applied in the design and development of high-performance, high burn-up fuels with improved safety, cladding integrity, and improved nuclear fuel cycle economics

Kristine Barrett

2012-09-01T23:59:59.000Z

165

Factors Influencing Readiness towards Halal Logistics among Food-based Logistics Players in Malaysia  

Science Journals Connector (OSTI)

Abstract Logistics is part of supply chain which involves many business entities such as suppliers, manufacturers, distributors and retailers. All these entities will work together to acquire raw materials and transform them into final products. Halal logistics is an approach to avoid contamination of perishable, raw materials and food products during transportation or distribution activities. It is also to avoid products missed information and to ensure that Muslim consumers will receive and consume only the Halalan Toyibban products. In Malaysian Standard for Halal Logistics (MS 2400:2010), halal logistics requirements according to Shariah law are including the requirement of logistics providers for transportation, warehousing and retailing. The requirement usually involved from processing to handling, distribution, storage, display, serving, packaging and labeling. There are few concerns regarding the implementation of halal logistics among logistics players. First, there is concern whether these players follow all guidelines and standards for halal logistics. Second, there is concern whether these players segregate their workers and facilities in producing and distributing activities for halal and non-halal products. This study seeks to investigate factors that influence readiness towards halal logistics among food-based logistics players. Face-to-face interviews were carried out with 156 managers representing logistics companies located in Peninsular Malaysia. Factor analysis was carried out to analyze the data obtained from the managers. The results revealed that support from management, enforcement of Halal Assurance System (HAS), environments controls, employee acceptance and company vision to change were the factors that influenced readiness towards halal logistics.

Hazwani Ahmad Tarmizi; Nitty Hirawaty Kamarulzaman; Ismail Abd Latiff; Azmawani Abd Rahman

2014-01-01T23:59:59.000Z

166

Are You Ready for Fall? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

167

Ready to Retrofit: The Process of Project Team Selection, Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ready to Retrofit: The Process of Project Team Selection, Building Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Title Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Publication Type Report LBNL Report Number LBNL-5893E Year of Publication 2012 Authors Sanders, Mark D., Kristen Parrish, and Paul A. Mathew Publisher LBNL Abstract This guide provides an introduction and overview to the retrofit process and then dives deeper into the key activities that an owner can influence most in the retrofit process: (1) Selecting Your Project Team, (2) Benchmarking Your Building, and (3) Financing Your Energy Efficiency Projects* Building Energy Retrofit Overview will provide you a simple explanation of the retrofit process, the project stages and the players involved.

168

REDD+ Country Readiness Preparation Proposals | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » REDD+ Country Readiness Preparation Proposals Jump to: navigation, search Tool Summary LAUNCH TOOL Name: REDD+ Country Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Focus Area: Forestry Topics: Implementation, Policies/deployment programs, Pathways analysis Resource Type: Publications, Guide/manual Website: www.wri.org/publication/getting-ready Country: Democratic Republic of Congo, Ghana, Guyana, Indonesia, Madagascar, Mexico, Suriname, Panama Middle Africa, Western Africa, South America, South-Eastern Asia, Eastern Africa, Central America, South America, Central America

169

SRS Tank 48H Waste Treatment Project Technology Readiness Assessment  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Tank 48H Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment Harry D. Harmon Joan B. Berkowitz John C. DeVine, Jr. Herbert G. Sutter Joan K. Young SPD-07-195 July 31, 2007 Prepared by the U.S. Department of Energy Aiken, South Carolina SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Signature Page 7/31/07 ___________________________ _________________________ John C. DeVine, Jr., Team Member Date SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Executive Summary The purpose of this assessment was to determine the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's

170

Training Program Graduates Weatherization-Ready Workers | Department of  

Broader source: Energy.gov (indexed) [DOE]

Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers April 29, 2010 - 5:45pm Addthis Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Lindsay Gsell On graduation day, students at Human Capital Development Corp., Inc. (HCDC) leave with more than just a diploma. They receive a hard hat, tool belt, hammer, utility knife and a tape measure. Graduates from Racine, Wis.-based HCDC First Choice Program are literally

171

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

172

Fast pandemic detection tool ready to fight flu  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Researchers are developing new tools for rapidly characterizing biological pathogens that could give rise to potentially deadly pandemics such as Influenza A (H1N1). June 9, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

173

Launching Apps for Energy! Developers, Are You Ready? | Department of  

Broader source: Energy.gov (indexed) [DOE]

Apps for Energy! Developers, Are You Ready? Apps for Energy! Developers, Are You Ready? Launching Apps for Energy! Developers, Are You Ready? April 5, 2012 - 4:00pm Addthis Apps for Energy is open for submissions. Sign-up at appsforenergy.challenge.gov. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Today, the Energy Department's Apps for Energy competition is open for submissions. Apps for Energy leverages Green Button -- an open standard for sharing utility data. Developers who build the best apps win part of a $100,000 cash prize. May 15 is the last day to submit an app. To submit your app design, signup at appsforenergy.challenge.gov The Energy Department's first ever Apps for Energy competition is officially open for submissions, starting today.

174

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

175

UNDP Readiness for Climate Finance | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » UNDP Readiness for Climate Finance Jump to: navigation, search Tool Summary Name: UNDP Readiness for Climate Finance Agency/Company /Organization: United Nations Development Programme (UNDP) Sector: Climate Focus Area: Renewable Energy Phase: Evaluate Options Topics: Co-benefits assessment, - Energy Access, Finance, Low emission development planning, -LEDS Resource Type: Guide/manual, Publications Website: www.undp.org/content/undp/en/home/librarypage/environment-energy/low_e Cost: Free Language: English The paper presents a framework for understanding what it means to be "ready" to use climate finance in a transformative way at the national level. In the context of the financial challenges posed by climate change,

176

Are You Ready to Make a Difference? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready to Make a Difference? Are You Ready to Make a Difference? Are You Ready to Make a Difference? September 27, 2010 - 2:23pm Addthis Secretary of Energy Steven Chu talks about the influence of his physics teacher. John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Providing America's students with a quality education is essential to ensuring that we can continue to be leaders of innovation and industry, and we can't fulfill that responsibility without quality teachers. There is already a great need for skilled math and science teachers and with many of the most accomplished educators approaching retirement age, the demand for specialists in those fields will only grow in the coming years. That's why public figures like Secretary Chu are sharing the personal impact that

177

Energy Department Emergency Response Team Ready to Respond to Hurricane  

Broader source: Energy.gov (indexed) [DOE]

Department Emergency Response Team Ready to Respond to Department Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm Addthis Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene’s landfall moment. | Image courtesy of NOAA Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene's landfall moment. | Image courtesy of NOAA Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability

178

Are You Ready for Fall? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

179

Tank Waste Feed Delivery System Readiness at the Hanford Site  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Audit Report Tank Waste Feed Delivery System Readiness at the Hanford Site OAS-L-12-09 August 2012 Department of Energy Washington, DC 20585 August 23, 2012 MEMORANDUM FOR THE MANAGER, OFFICE OF RIVER PROTECTION FROM: David Sedillo, Director Western Audits Division Office of Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Tank Waste Feed Delivery System Readiness at the Hanford Site" BACKGROUND The Department of Energy's largest cleanup task involves the treatment, immobilization and disposal of 56 million gallons of hazardous and highly radioactive waste at the Hanford Site, located in Southeastern Washington State. As part of this effort, the Department is constructing

180

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect (OSTI)

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, Comprehensive Emergency Management System. The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?  

SciTech Connect (OSTI)

This paper will describe a technology readiness assessment process (TRA) that the U.S. Department of Energy (DOE) piloted at Hanford's Waste Treatment and Immobilization Plant (WTP) and has subsequently applied to other projects at Hanford and the Savannah River Site. The methodology used for these TRAs was based upon detailed guidance contained in the U.S. Department of Defense (DoD), Technology Readiness Assessment Desk-book and adapted a technology readiness scale developed by the DOD and National Aeronautics and Space Administration (NASA) to the DOE. This paper will discuss the application of the TRA process to the WTP and the development of a Technology Maturation Plan (TMP) based on the TRA findings. (authors)

Alexander, D. [Department of Energy, Office of River Protection, Richland, Washington (United States); Gerdes, K. [Department of Energy, Office of Waste Processing, Germantown, Maryland (United States); Holton, L. [Pacific Northwest National Laboratory, Richland, Washington (United States); Krahn, St. [Department of Energy, Office of Waste Processing, Germantown, Maryland (United States); Sutter, H. [Consultant, Department of Energy, Office of Project Recovery, Germantown, Maryland (United States)

2008-07-01T23:59:59.000Z

182

A wind turbine blade is ready to be lifted into place at the Windy Point Wind Farm in the Columbia River Gorge. Photo: C. Bruce Forster  

E-Print Network [OSTI]

A wind turbine blade is ready to be lifted into place at the Windy Point Wind Farm in the Columbia and wildlife recovery. At a conceptual level, the Act aimed for a power system that would meet energy demands pressure off Columbia River fish and wildlife. For the power system, moving ahead would require modified

183

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network [OSTI]

Capture Ready is a design concept enabling fossil fuel plants to be retrofitted more economically with carbon dioxide capture and storage (CCS) technologies, however financing the cost of capture ready can be problematic, especially...

Liang, Xi; Reiner, David; Gibbons, Jon; Li, Jia

184

DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build...  

Energy Savers [EERE]

Study: Boulder ZED Design Build - Boulder, Colorado DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build - Boulder, Colorado Case study of a DOE Zero Energy Ready Home...

185

Zero Energy-Ready Single-Family Homes - Building America Top...  

Energy Savers [EERE]

Zero Energy-Ready Single-Family Homes - Building America Top Innovation Zero Energy-Ready Single-Family Homes - Building America Top Innovation Photo of a zero-energy,...

186

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey...  

Energy Savers [EERE]

Study: Clifton View Homes, Whidbey Island, WA DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA Case study of a DOE Zero Energy Ready home on Whidbey...

187

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston...  

Energy Savers [EERE]

Study: M Street Homes, Houston, TX DOE Zero Energy Ready Home Case Study: M Street Homes, Houston, TX Case study of a DOE Zero Energy Ready home in Houston, TX, that achieves a...

188

DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

One Sky Homes, San Jose, CA DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA Case study of a...

189

What to Expect When Readying to Move Spent Nuclear Fuel from...  

Broader source: Energy.gov (indexed) [DOE]

What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear Power Plants What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear Power...

190

Computer vs. Video Game System: Ready to Rumble in the #EnergyFaceoff...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Computer vs. Video Game System: Ready to Rumble in the EnergyFaceoff Jungle Computer vs. Video Game System: Ready to Rumble in the EnergyFaceoff Jungle November 4, 2014 - 10:20am...

191

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury...  

Energy Savers [EERE]

Study: BPC Green Builders, Danbury, CT DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored...

192

DOE Zero Energy Ready Home Case Study, New Town Builders, Denver...  

Office of Environmental Management (EM)

New Town Builders, Denver, CO, Production Home DOE Zero Energy Ready Home Case Study, New Town Builders, Denver, CO, Production Home Case study of a DOE Zero Energy Ready Home in...

193

DOE Zero Energy Ready Home Case Study 2013: Manatee County Habitat...  

Energy Savers [EERE]

Energy Ready Home has a 2.5-kW PV system obtained with assistance from Florida Power and Light. All of the homes in the development are solar-energy ready with conduit in place...

194

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury...  

Broader source: Energy.gov (indexed) [DOE]

BPC Green Builders, Danbury, CT DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored HERS...

195

CCSI Technology Readiness Levels Likelihood Model (TRL-LM) Users Guide  

SciTech Connect (OSTI)

This is the manual for the Carbon Capture Simulation Initiative (CCSI) Technology Readiness Level Likelihood model based on PNNL velo.

Engel, David W.; Dalton, Angela C.; Sivaramakrishnan, Chandrika; Lansing, Carina

2013-03-26T23:59:59.000Z

196

DOE Zero Energy Ready Home Case Study: Shore Road Project- Old Greenwich, Connecticut  

Broader source: Energy.gov [DOE]

This case study describes the builder Murphy Brothers' first DOE Zero Energy Ready Home in Old Greenwich, CT.

197

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Quality Management Systems for Zero Energy Ready Home, presented in October 2014.

198

Text-Alternative Version: ENERGY STAR for SSL: Getting Ready for September 30  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the ENERGY STAR for SSL: Getting Ready for September 30 webcast.

199

DOE Hydrogen and Fuel Cell Overview: 2011 Hydrogen Infrastructure Market Readiness Workshop  

Broader source: Energy.gov [DOE]

Presentation by Sunita Satyapal at the Hydrogen Infrastructure Market Readiness Workshop, February 16, 2011, in Washington, DC.

200

Energy Flow: A Multimodal `Ready' Indication For Electric Vehicles  

E-Print Network [OSTI]

Energy Flow: A Multimodal `Ready' Indication For Electric Vehicles Abstract The lack of sound and vibration while starting the drive system of an electric vehicle (EV) is one of the major differences the energy level to the driver. With Energy Flow (see Figure 1), we test if there will be a benefit in terms

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Shunting passenger trains: getting ready for Marjan van den Akker  

E-Print Network [OSTI]

Shunting passenger trains: getting ready for departure Marjan van den Akker Hilbrandt Baarsma Utrecht University P.O. Box 80.089 3508 TB Utrecht The Netherlands #12;Shunting passenger trains: getting of shunting train units on a railway station. Train units arrive at and depart from the station according

Utrecht, Universiteit

202

DOE Zero Energy Ready Home: Montlake Modern- Seattle, Washington  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features structural insulated panel walls and roof, an air-to-water heat pump plus radiant floor heat; 100% LED lighting; filtered-fan-powered fresh air intake; triple-pane windows, and 9.7 kWh PV for electric car charging station.

203

Colorado Community Readiness Efforts for PEVs Support State Policy Development  

Office of Energy Efficiency and Renewable Energy (EERE)

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies), funded by EEREs Clean Cities plug-in electric vehicle community readiness award, has supported the development of Colorado state policies to accelerate the adoption of plug-in electric vehicles (PEVs).

204

U.S. Department of Energy Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide assists individuals and teams involved in conducting Technology Readiness Assessments and developing Technology Maturation Plans for the DOE capital acquisition asset projects subject to DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-4A. Does not cancel other directives.

2009-10-12T23:59:59.000Z

205

DOE Zero Energy Ready Home: Leganza Residence - Greenbank, Washington...  

Energy Savers [EERE]

panel (SIPs) walls, a 10.25-inch SIPS roof, an R-20 insulated slab, a 2-ton ground source heat pump, radiant floor heat, 7.1 kWh PV, and triple-pane windows. DOE Zero Energy Ready...

206

INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF  

E-Print Network [OSTI]

1 INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF DESIGN ISSUES Colin.entrepreneur.strath.ac.uk #12;1 INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF DESIGN ISSUES+ Colin are not investment ready. Their owners are unwilling to seek external equity finance and those who are willing do

Mottram, Nigel

207

Secure Transportation_final_print-ready  

Broader source: Energy.gov (indexed) [DOE]

A A History of Secure Transportation * The transportation of the CEUSP material in casks will be made by Hittman Transport, a commercial carrier * Hittman Transport is a specialty company whose primary mission is transporting hazardous materials * Transport method meets all of the requirements of the Department of Energy, Nuclear Regulatory Commission, and Department of Transportation for shipment of hazardous radioactive material * Hittman Transport maintains drivers with DOE security clearances and all shipments will be escorted by armed Federal officers Hittman Transport drivers' average number of years experience 26 Completed Hittman Transport shipments without significant accident or loss of material 196K Hittman Transport began supporting the nuclear industry

208

Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Salt Waste Processing Facility Salt Waste Processing Facility Technology Readiness Assessment Report Kurt D. Gerdes Harry D. Harmon Herbert G. Sutter Major C. Thompson John R. Shultz Sahid C. Smith July 13, 2009 Prepared by the U.S. Department of Energy Washington, D.C. SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 ii This page intentionally left blank SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii Signatures SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iv This page intentionally left blank SRS Salt Waste Processing Facility

209

Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

DOE-STD-3006-2000 DOE-STD-3006-2000 June 2000 Superseding DOE-STD-3006-95 November 1995 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823 Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-2000 iii PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR)

210

Sandia National Laboratories' Readiness in Technical Base and Facilities Program  

Broader source: Energy.gov (indexed) [DOE]

Sandia National Laboratories' Sandia National Laboratories' Readiness in Technical Base and Facilities Program OAS-L-13-13 September 2013 Department of Energy Washington, DC 20585 September 5, 2013 MEMORANDUM FOR THE MANAGER, SANDIA FIELD OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Sandia National Laboratories' Readiness in Technical Base and Facilities Program" BACKGROUND The Department of Energy's (Department) Sandia National Laboratories (Sandia) is a Government-owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. One of Sandia's key missions is to ensure the safety, reliability and performance of the Nation's nuclear weapons stockpile. To accomplish

211

The Valles Caldera is ready for its close-up  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 2013 » January 2013 » The Valles Caldera Is Ready For Its Close-up Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit The Valles Caldera is ready for its close-up The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System as soon as January. January 1, 2013 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email The piece explores the potential impact of climate change and the 2011 Los Conchas fire on the sensitive ecosystem in the area. The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System (KNME) as soon as January. The piece, called Valles Caldera: The Science, explores the potential impact of

212

Marine and Hydrokinetic Technology Readiness Level | Open Energy  

Open Energy Info (EERE)

Marine and Hydrokinetic Technology Readiness Level Marine and Hydrokinetic Technology Readiness Level Jump to: navigation, search << Return to the MHK database homepage This field indicates the stage of development/deployment that technologies, which are undergoing partial or full-scale device testing, are currently in. Contents 1 TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering 2 TRL 4: Proof of Concept 3 TRL 5/6: System Integration and Technology Laboratory Demonstration 4 TRL 7/8: Open Water System Testing, Demonstration, and Operation 5 TRL 9: Commercial-Scale Production / Application TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering The purpose of this stage is to evaluate, to the largest extent possible, the scientific or technical merit and feasibility of ideas that appear to

213

Taking the Challenge at Singer Village--A Cold Climate Zero Energy Ready Home  

SciTech Connect (OSTI)

After progressively incorporating ENERGY STAR(R) for Homes Versions 1, 2, and 3 into its standard practices over the years, this builder, Brookside Development, was seeking to build an even more sustainable product that would further increase energy efficiency, while also addressing indoor air quality, water conservation, renewable-ready, and resiliency. These objectives align with the framework of the DOE Challenge Home program, which 'builds upon the comprehensive building science requirements of ENERGY STAR for Homes Version 3, along with proven Building America innovations and best practices. Other special attribute programs are incorporated to help builders reach unparalleled levels of performance with homes designed to last hundreds of years.' CARB partnered with Brookside Development on the design optimization and construction of the first home in a small development of seven planned new homes being built on the old Singer Estate in Derby, CT.

Puttagunta, S.; Gaakye, O.

2014-10-01T23:59:59.000Z

214

Mexico-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Mexico-The World Bank Partnership for Market Readiness (PMR) Mexico-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Mexico-The World Bank Partnership for Market Readiness (PMR) Name Mexico-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

215

Colombia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Colombia-The World Bank Partnership for Market Readiness (PMR) Colombia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Colombia-The World Bank Partnership for Market Readiness (PMR) Name Colombia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

216

Brazil-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Brazil-The World Bank Partnership for Market Readiness (PMR) Brazil-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Brazil-The World Bank Partnership for Market Readiness (PMR) Name Brazil-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

217

Thailand-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Thailand-The World Bank Partnership for Market Readiness (PMR) Thailand-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Thailand-The World Bank Partnership for Market Readiness (PMR) Name Thailand-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

218

China-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

China-The World Bank Partnership for Market Readiness (PMR) China-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: China-The World Bank Partnership for Market Readiness (PMR) Name China-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

219

India-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

India-The World Bank Partnership for Market Readiness (PMR) India-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: India-The World Bank Partnership for Market Readiness (PMR) Name India-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

220

Ukraine-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Ukraine-The World Bank Partnership for Market Readiness (PMR) Ukraine-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Ukraine-The World Bank Partnership for Market Readiness (PMR) Name Ukraine-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Chile-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Chile-The World Bank Partnership for Market Readiness (PMR) Chile-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Chile-The World Bank Partnership for Market Readiness (PMR) Name Chile-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

222

Vietnam-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Vietnam-The World Bank Partnership for Market Readiness (PMR) Vietnam-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Vietnam-The World Bank Partnership for Market Readiness (PMR) Name Vietnam-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

223

Morocco-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Morocco-The World Bank Partnership for Market Readiness (PMR) Morocco-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Morocco-The World Bank Partnership for Market Readiness (PMR) Name Morocco-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

224

DOE Zero Energy Ready Home: Better Business for Builders Webinar Transcript  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, DOE Zero Energy Ready Home: Better Business for Builders, presented in August 2014.

225

Marketing and Sales Solutions for Zero Energy Ready Homes Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Marketing and Sales Solutions for Zero Energy Ready Homes, presented in June 2014.

226

DOE Zero Energy Ready Home Low Load High Efficiency HVAC Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the DOE Zero Energy Ready Home webinar, Low Load High Efficiency HVAC, presented in May 2014.

227

DOE Zero Energy Ready Home Case Study, Ferguson Design and Constructio...  

Energy Savers [EERE]

Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY, Custom Home DOE Zero Energy Ready Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY,...

228

Sales and Value Recognition for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Sales and Value Recognition for Zero Energy Ready Home, presented in December 2014.

229

DOE Zero Energy Ready Home Case Study: Habitat for Humanity South...  

Energy Savers [EERE]

Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL...

230

Energy-- and Water-- Efficiency in the DOE Zero Energy Ready Home Program Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program, presented in October 2014.

231

Jordan-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Jordan-The World Bank Partnership for Market Readiness (PMR) Jordan-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Jordan-The World Bank Partnership for Market Readiness (PMR) Name Jordan-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

232

Indonesia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Indonesia-The World Bank Partnership for Market Readiness (PMR) Indonesia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Indonesia-The World Bank Partnership for Market Readiness (PMR) Name Indonesia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

233

Turkey-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Turkey-The World Bank Partnership for Market Readiness (PMR) Turkey-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Turkey-The World Bank Partnership for Market Readiness (PMR) Name Turkey-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

234

DOE Zero Energy Ready Home High-Performance Home Sales Training Part 1 Webinar-- Text Version  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar DOE Zero Energy Ready Home High-Performance Home Sales Training Part 1, presented in February 2015.

235

NCTCOG Solar Ready II Project: Clean Air Through Energy Efficiency  

E-Print Network [OSTI]

Clean Air Through Energy Efficiency November 20, 2014 NCTCOG Solar Ready II Project Lori Clark Principal Air Quality Planner ESL-KT-14-11-12 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 U.S. Department of Energy Sun...Shot Initiative Rooftop Solar Challenge 2 ESL-KT-14-11-12 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 U.S. Department of Energy (DOE) SunShot Initiative The U.S. Department of Energy SunShot Initiative is a collaborative national...

Clark,L.

2014-01-01T23:59:59.000Z

236

Final Report on HOLODEC 2 Technology Readiness Level  

SciTech Connect (OSTI)

During the period of this project, the Holographic Detector for Clouds 2 (HOLODEC 2) instrument has advanced from a laboratory-proven instrument with some initial field testing to a fully flight-tested instrument capable of providing useful cloud microphysics measurements. This can be summarized as 'Technology Readiness Level 8: Technology is proven to work - Actual technology completed and qualified through test and demonstration.' As part of this project, improvements and upgrades have been made to the optical system, the instrument power control system, the data acquisition computer, the instrument control software, the data reconstruction and analysis software, and some of the basic algorithms for estimating basic microphysical variables like droplet diameter. Near the end of the project, the instrument flew on several research flights as part of the IDEAS 2011 project, and a small sample of data from the project is included as an example. There is one caveat in the technology readiness level stated above: the upgrades to the instrument power system were made after the flight testing, so they are not fully field proven. We anticipate that there will be an opportunity to fly the instrument as part of the IDEAS project in fall 2012.

Shaw, RA; Spuler, SM; Beals, M; Black, N; Fugal, JP; Lu, L

2012-06-18T23:59:59.000Z

237

Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor  

SciTech Connect (OSTI)

This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews.

HONEYMAN, J.O.

2000-04-24T23:59:59.000Z

238

Evaluation of Organizational E-Government Readiness in the Public Sector  

Science Journals Connector (OSTI)

The purpose of this paper is to provide an integrated framework to evaluate organizational e-government readiness for government organizations. This framework is necessary as current ones ignore challenges that arise due to organizational transformation ... Keywords: E-Government, E-Readiness, Information and Communication Technologies ICTs, Organizational Adoption, Organizational Strategy

Ibrahim A. Alghamdi; Robert Goodwin; Giselle Rampersad

2013-04-01T23:59:59.000Z

239

The Effects of Structured Work Experience on the Work-Readiness Skills of Students with Disabilities  

E-Print Network [OSTI]

. The problem is the lack of intervention research demonstrating ways of implementing programs that are associated with acquisition of work-readiness skills. The purpose of this study was to investigate the effects of structured work experience on the work-readiness...

Pacha, Jacqueline K

2013-05-03T23:59:59.000Z

240

A Review of the World Bank Forest Carbon Partnership Facility Readiness  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Jump to: navigation, search Tool Summary Name: A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: pdf.wri.org/working_papers/getting_ready_2010-07-13.pdf A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Screenshot References: A Review of R-PP[1] This working paper is part of a series of regular updates reviewing the Readiness Preparation Proposals (R-PPs) submitted by REDD+ Country

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Welcome to the Operation READY 2002 collection Flexible formats: print, CD-ROM, DVD video and Web  

E-Print Network [OSTI]

1 Welcome to the Operation READY 2002 collection Flexible formats: print, CD-ROM, DVD video and Web Op READY 2002 documents in PDF and Word Customize to meet local needs Versatile training tools CD-ROM

242

Mobile RNA is Poised and Ready | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Glass Does a Double-Take Glass Does a Double-Take Welcoming a New Family of Superconductors A Lensless X-ray Camera for Nanoscale Materials and Biological Specimens The Collagen Protein Viewed at Unprecedented Detail Assembling Nanoparticles the Easy DNA-Way Science Highlights Archives: 2013 | 2012 | 2011 | 2010 2009 | 2008 | 2007 | 2006 2005 | 2004 | 2003 | 2002 2001 | 2000 | 1998 | Subscribe to APS Science Highlights rss feed Mobile RNA is Poised and Ready APRIL 10, 2008 Bookmark and Share Ribbon representation of the group II splicing intron. To see a 360° rotation of the recently solved O. iheyensis IIC intron crystal structure, click here (credit: Kevin Keating). A new picture of a genetic parasite isolated from a deep-sea bacterium is helping researchers see how certain specialized segments of RNA escape from

243

Accelerator Driven System Target Requirements and R&D  

E-Print Network [OSTI]

-nosed assessment, addressing the technical requirements for ADS the current status and readiness of accelerator #12;Accelerator Driven Systems High-power, highly reliable proton accelerator · ~1 GeV beam energy · ~1 MW of beam power for demonstration · Tens of MW beam power for Industrial-Scale System Spallation

McDonald, Kirk

244

Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Small Column Ion Exchange Technology at Small Column Ion Exchange Technology at Savannah River Site U.S. Department of Energy Office of Environmental Management Office of Technology Innovation and Development Technology Readiness Assessment Report November 2011 U.S. DOE-EM Office of Technology Innovation and Development November 11, 2011 Small Column Ion Exchange Program Technology Readiness Assessment Page 2 of 112 This page intentionally left blank November 11, 2011 U.S. DOE-EM Office of Technology Innovation and Development Small Column Ion Exchange Program Technology Readiness Assessment Page 3 of 112 APPROVALS ________________________ _ Harry D. Harmon Date

245

Operational readiness review for the Waste Experimental Reduction Facility. Final report  

SciTech Connect (OSTI)

An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory`s (INEL`s) Waste Experimental Reduction Facility (WERF) was conducted by EG&G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report.

Not Available

1993-11-01T23:59:59.000Z

246

South Africa-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

South Africa-The World Bank Partnership for Market Readiness (PMR) South Africa-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: South Africa-The World Bank Partnership for Market Readiness (PMR) Name South Africa-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

247

Costa Rica-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Costa Rica-The World Bank Partnership for Market Readiness (PMR) Costa Rica-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Costa Rica-The World Bank Partnership for Market Readiness (PMR) Name Costa Rica-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

248

Zero Energy-Ready Single-Family Homes- Building America Top Innovation  

Broader source: Energy.gov [DOE]

Many Building America teams (ARBI, BA-PIRC, BSC, CARB, IBACOS, NorthernSTAR, PHI, etc.) have worked with home builders to design and test zero-energy-ready homes.

249

Building America Top Innovations 2013 Profile Zero Energy-Ready Single-Family Homes  

Broader source: Energy.gov [DOE]

Many Building America teams (ARBI, BA-PIRC, BSC, CARB, IBACOS, NorthernSTAR, PHI, etc.) have worked with home builders to design and test zero-energy-ready homes.

250

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored HERS 35 without PV. This 2-story, 1,650-ft2 cabin built by a custom home builder for his own family meets Passive House...

251

DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study, Clifton View Homes, Coupeville, WA, Systems Home DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville, WA, Systems Home Case-study of a DOE Zero Energy...

252

DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study: Palo Duro Homes, Albuquerque, NM DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, NM Case study of a New Mexico-based home builder who has built more DOE...

253

DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc....  

Energy Savers [EERE]

Study, Palo Duro Homes, Inc., Albuquerque, NM, Production DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc., Albuquerque, NM, Production Case study of a DOE Zero Energy...

254

DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, NM  

Broader source: Energy.gov [DOE]

Case study of a New Mexico-based home builder who has built more DOE Zero Energy Ready certified homes than any builder in the nation. One example home achieved a HERS score of HERS 55 without PV...

255

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL  

Broader source: Energy.gov [DOE]

Case study of the first manufactured home built to the DOE Zero Energy Ready Home standard. This manufactured home achieved a HERS score of 57 without PV. The home has been set up for side-by-side...

256

DOE Zero Energy Ready Home Case Study 2014: Boulder ZED Design...  

Energy Savers [EERE]

Savings: with PV -292.9 MMBtu DOE ZERO ENERGY READY HOME Boulder ZED Design Build 2 polyethylene vapor barrier, then spray foams the foundation walls with 3 inches of open-cell...

257

DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in San Jose, CA, that achieved a HERS 69 on the California HERS score without PV, or HERS -1 with 6.4 kW of PV.

258

Building America Zero Energy Ready Home Case Study: Imery Group, Proud Green Home, Serenbe GA  

Broader source: Energy.gov [DOE]

Case study describing the first DOE-certified zero energy ready home in Georgia, featuring 2x6 advanced framed wall, spray foamed walls and attic plus rigid foam and coated OSB.

259

Focus Series: Program Finds Community Readiness Is the Key to More Retrofits  

Broader source: Energy.gov [DOE]

Focus Series: Program Finds Community Readiness Is the Key to More Retrofits, a document posted by the U.S. Department of Energys (DOES) Better Buildings Neighborhood Program.

260

Predicting School Readiness for Low-Income Children With Disability Risks Identified Early.  

E-Print Network [OSTI]

This study examined school readiness at kindergarten entry for low-income children whose disability indicators were identified before age 3. Data were collected as part ofthe Early Head Start Research and Evaluation ...

Jeon, Hyun-Joo; Peterson, Carla A.; Wall, Shavaun; Carta, Judith J.; Gayle, Luze; Eshbaugh, Elaine M.; Swanson, Mark

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Bellingham, WA, that achieves HERS 43 without PV or HERS 13 with 3.2 kW of PV.

262

DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Charlottesville, VA, that achieves a HERS 33 without PV. The 2,572-ft2 custom home with daylight basement, has 2x6 advanced framed walls filled with R...

263

A FAST WAVELET-BASED VIDEO CODEC AND ITS APPLICATION IN AN IP VERSION 6-READY  

E-Print Network [OSTI]

,mpalkow,schmidt,mw]@fhtw-berlin.de D. MARPE Fraunhofer-Institut für Nachrichtentechnik HHI Image Processing Department Einsteinufer 37 (MCU). It is equipped with an innovative addressing system for locating mobile users and ready for next

Marpe, Detlev

264

L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PAC.P6.04 Westinghouse Test Stand Technical Readiness Review Andrew Godfrey ORNL Completed: June 25, 2013 CASL- -2013-01 -000 Consortium for Advanced Simulation of LWRs Consortium...

265

DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL  

Broader source: Energy.gov [DOE]

Case study of the first manufactured home built to the DOE Zero Energy Ready Home standard. This manufactured home achieved a HERS score of 57 without PV. The home has been set up for side-by-side...

266

Application of the cumulative risk model in predicting school readiness in Head Start children  

E-Print Network [OSTI]

This study investigates the degree to which the cumulative risk index predicted school readiness in a Head Start population. In general, the reviewed studies indicated the cumulative risk model was efficacious in predicting adverse developmental...

Rodriguez-Escobar, Olga Lydia

2009-05-15T23:59:59.000Z

267

DOE Zero Energy Ready Home Going Green and Building Strong: Building...  

Broader source: Energy.gov (indexed) [DOE]

2 Webinar (Text Version) DOE Zero Energy Ready Home Going Green and Building Strong: Building a FORTIFIED Home -- Part 2 Webinar (Text Version) Below is the text version of the...

268

DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom...  

Broader source: Energy.gov (indexed) [DOE]

Study, BPC Green Builders, Custom Home, New Fairfield, CT DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom Home, New Fairfield, CT Case study of a DOE Zero Energy...

269

DOE Zero Energy Ready Home Going Green and Building Strong: Building...  

Broader source: Energy.gov (indexed) [DOE]

1 Webinar (Text Version) DOE Zero Energy Ready Home Going Green and Building Strong: Building a FORTIFIED Home -- Part 1 Webinar (Text Version) Below is the text version of the...

270

DOE ZERH Webinar: Technical Resources for Marketing and Selling Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

Plan review energy modeling field inspections certificationdone! Right? If only it were that simple to successfully transition to Zero Energy Ready Homes. The reality is that theres a lot...

271

The Sandia MEMS Passive Shock Sensor : FY08 testing for functionality, model validation, and technology readiness.  

SciTech Connect (OSTI)

This report summarizes the functional, model validation, and technology readiness testing of the Sandia MEMS Passive Shock Sensor in FY08. Functional testing of a large number of revision 4 parts showed robust and consistent performance. Model validation testing helped tune the models to match data well and identified several areas for future investigation related to high frequency sensitivity and thermal effects. Finally, technology readiness testing demonstrated the integrated elements of the sensor under realistic environments.

Walraven, Jeremy Allen; Blecke, Jill; Baker, Michael Sean; Clemens, Rebecca C.; Mitchell, John Anthony; Brake, Matthew Robert; Epp, David S.; Wittwer, Jonathan W.

2008-10-01T23:59:59.000Z

272

Effects of Parent Expectations and Involvement on the School Readiness of Children in Head Start  

E-Print Network [OSTI]

of children enrolled in Head Start. The study examined how these iv parent variables were related to children?s school readiness, and differences between ethnic groups, gender groups, and level of risk. The study tested a model whereby the effect... experimental measures in addition to questionnaires adapted from standardized measures to assess parent behaviors. Standardized measures were administered to children to assess school readiness. Demographic information and level of risk were gathered using...

Cook, Krystal Tisha'

2010-10-12T23:59:59.000Z

273

Greenhouse gas emission reduction anticipating CO2 capture. How ready are you?  

Science Journals Connector (OSTI)

The Dutch Ministry of Spatial Planning and the Environment (VROM) engaged Jacobs Consultancy to develop a definition and measuring tool aimed at quantifying the CO2 Capture Readiness of a combustion plant. The tool developed tests the level and completeness of pre-project execution information. The testing of pre-project information is a standard practice in the refining and petrochemical industry and Jacobs Consultancy has adapted and tailored these practices to develop the Capture Readiness tool. The tool was developed in 2008 and was pilot tested on two already permitted coal fired power plant projects in 2009. The Capture Readiness tool is similar in concept to the well known Project Definition Rating Index originally introduced by the Construction Industry Institute for Major Capital Projects. The tool quantifies the readiness of a project to accommodate future CO2 capture and parallels the phased approached to Major Capital Projects used by the Project Definition Rating Index. A short introduction to the application of the PDRI methodology to test the completeness of the project development informationoften also referred to as Front End Loading or FEL, is included in this paper to establish the parallel approach we have used in the development of the Capture Readiness tool. The Jacobs Consultancy Capture Readiness tool is then discussed in more detail.

F.P.J.M. (Bas) Kerkhof; G. van Birgelen

2011-01-01T23:59:59.000Z

274

Readiness Assessment for MF-628 Drum Treatment Facility - Advanced...  

Broader source: Energy.gov (indexed) [DOE]

ENV.1 Adequate and correct environmental permit requirements and hazardous waste procedures and limits are in place for operating the DTF ventilation system and conducting drum...

275

Zero Energy Ready Home April 2014 Newsletter | Department of...  

Broader source: Energy.gov (indexed) [DOE]

April 2014 Newsletter Table of Contents: A Note From Sam Rashkin: "Goodbye Challenge, Hello Zero" New Release: REV04 of the National Program Requirements Update: Hot water...

276

DOE Zero Energy Ready Home: Ventilation and Filtration Strategies with Indoor airPLUS Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, DOE Zero Energy Ready Home: Ventilation and Filtration Strategies with Indoor airPLUS, presented in August 2014.

277

Economic analysis under uncertainty of coal fired capture-ready power plants  

Science Journals Connector (OSTI)

This study assesses the feasibility of investing in capture ready (CR) coal-based power plants under uncertainty. It defines eighteen cases according to three routes for carbon capture (post, pre and oxy-combustion) and different levels of readiness. Due to the uncertain nature of the development of capture plants, this study applies a probabilistic analysis. Findings for the more likely scenario (median value) indicated that severe pre-investments in CR plants are the best choice only when the implementation of the capture occurs in the short term. In the long term, the investment decision favored the power plants not fully ready. Interestingly, under a less likely but possible scenario (the inferior limit of the probabilistic analysis) IGCC-Ready plants become the best option in the short term, and then oxy-combustion ready plants stand out. Hence, some policies such as those based on financing lowering the discount rate perceived by investors, and those based on fund to research and development, might create an investment environment favorable to CR plants.

Pedro R.R. Rochedo; Alexandre Szklo

2013-01-01T23:59:59.000Z

278

Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next  

Broader source: Energy.gov (indexed) [DOE]

Ready, Set . . . Get Prepped for Monday's Launch of the Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge April 29, 2011 - 10:35am Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs The 'America's Next Top Energy Innovator' Challenge will begin on May 2. That means that starting on Monday, and continuing through December 15, entrepreneurs and start-up companies will be able to apply for any of the Department of Energy's 15,000 unlicensed patents at a greatly reduced cost and with much less paperwork. Since Secretary Chu announced the challenge at the end of March our phones have been ringing and our email inboxes have been piling up with questions

279

Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money |  

Broader source: Energy.gov (indexed) [DOE]

Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money September 21, 2009 - 3:04pm Addthis Allison Casey Senior Communicator, NREL Tomorrow is the official first day of fall, and while I always mourn the end of summer, one of the best things about fall is leaf peeping! Last year, we took my father-in-law's red '57 T-bird convertible on a lovely drive through the mountains to see the bright yellow aspens. Something about a car like that draws lots of attention-honks, waves, questions. We basically made friends everywhere we went. As much fun as that was, it wasn't exactly the most fuel-efficient or environmentally friendly excursion. I know we can do better this year; beautiful leaves are less than an hour's

280

Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure  

Broader source: Energy.gov (indexed) [DOE]

Ready for Electric Drive: the Plug-In Vehicle and Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop August 18, 2010 - 5:30pm Addthis Matt Rogers Matt Rogers McKinsey & Company Blogs have been abuzz on electric vehicles and advanced batteries recently, and likely in no small part due to some of the programs that are kicking into high gear at the Department of Energy right now. On July 22, we hosted a Plug-In Vehicle & Infrastructure Workshop that brought together nearly 200 attendees and 600 web participants to discuss near-term actions to accelerate deployment of electric-drive vehicles. The program demonstrated how federal leadership can speed up preparation for vehicles expected in showrooms at the end of this year. This leadership complements the Obama

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Houston Smart Grid System Almost Ready for Launch | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid System Almost Ready for Launch Smart Grid System Almost Ready for Launch Houston Smart Grid System Almost Ready for Launch October 8, 2010 - 11:29am Addthis CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company’s electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company's electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy Kevin Craft What does this mean for me? The AMS/IG initiative supports 588 jobs, half of which would not have existed had the company not received money from the Recovery Act. Once their smart meter is installed, consumers are able to access the Smart Meter Texas Portal online to obtain updates on their daily energy

282

Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark |  

Broader source: Energy.gov (indexed) [DOE]

Nek5000 Ready to Use after Simulations of Important Pipe Flow Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark January 29, 2013 - 1:42pm Addthis Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. As part of the on-going Nek5000 validation efforts, a series of large eddy simulations (LES) have been performed for thermal stratification in a pipe. Results were in good agreement with the experiment and the simulation data has provided insight into the physics of the flow. An additional series of simulations of the OECD-NEA MATiS-H benchmark has also been completed using intermediate- fidelity modeling approaches, such as k-epsilon, k-omega shear stress transport, and ID detached eddy simulation, as well as one

283

The Ohio State University Readies for its Encore at the Solar Decathlon |  

Broader source: Energy.gov (indexed) [DOE]

The Ohio State University Readies for its Encore at the Solar The Ohio State University Readies for its Encore at the Solar Decathlon The Ohio State University Readies for its Encore at the Solar Decathlon April 15, 2011 - 5:03pm Addthis The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy How can I participate? The next Solar Decathlon will be held Sept. 23-Oct. 2, 2011, at

284

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

285

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

286

Readiness Assessment for MF-628 Drum Treatment Facility - Advanced...  

Broader source: Energy.gov (indexed) [DOE]

of all safety, process, and utility systems and support equipment will support the safe conduct of operations. MN. 1.4 Hoisting and rigging equipment, required for the activity...

287

ENERGY STAR Focus on Energy Efficiency in Ready Mix Concrete Manufacturing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ready Mix Concrete Ready Mix Concrete Manufacturing Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Get started with ENERGY STAR Make the business case Build an energy management program Measure, track, and benchmark Tools for benchmarking energy management practices Tools for tracking and benchmarking facility energy performance ENERGY STAR Energy Performance Indicators for plants

288

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP)  

Broader source: Energy.gov (indexed) [DOE]

TECHNOLOGY READINESS ASSESSMENT TECHNOLOGY READINESS ASSESSMENT OF THE CALCINE DISPOSITION PROJECT VOLUME ONE Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC February 2011 ii This page intentionally left blank. Review of Calcine Disposition Project Self-Assessment of Technology Maturation iii SIGNATURES ____________________________________ ____________________________________ Anthony F. Kluk, Team Lead Date ____________________________________ ____________________________________ Hoyt C. Johnson Date ____________________________________ ____________________________________ Clyde Phillip McGinnis Date ____________________________________ ____________________________________

289

Analyses of Value-added for Case-ready Beef, with Special Emphasis on Texas.  

E-Print Network [OSTI]

beef at retail and increasing the value-added from beef at the packer /processor level. Adoption of case-ready packaging technology by the beef industry trans fers the function of retail cutting and packaging of fresh beef from the retail store... beef at retail and increasing the value-added from beef at the packer /processor level. Adoption of case-ready packaging technology by the beef industry trans fers the function of retail cutting and packaging of fresh beef from the retail store...

Dietrich, R.A.; Farris, D.E.; Ward, J.B

1992-01-01T23:59:59.000Z

290

Organizational readiness and the adoption of electronic business: the moderating role of national culture in 29 european countries  

Science Journals Connector (OSTI)

In this paper we explore the relationship between average organizational readiness and actual electronic business (e-business) adoption at a national level. Several researchers have provided empirical evidence suggesting that an organization's readiness ... Keywords: adoption, electronic business, europe, individualism, masculinity, national cultural effects, power distance, uncertainty avoidance

Tobias Kollmann*; Andreas Kuckertz; Nicola Breugst

2009-10-01T23:59:59.000Z

291

Required Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

292

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

293

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

294

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review  

Broader source: Energy.gov (indexed) [DOE]

Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

295

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network [OSTI]

more economically with carbon dioxide capture and storage (CCS) technologies, however financing. Keywords: Capture Option, Capture Ready, Carbon Capture and Storage, Climate Change, Coal-fired Electricity;List of Abbreviations CAPM (Capital Asset Pricing Model) CCS (Carbon Capture and Storage) CEC (China

Aickelin, Uwe

296

Team leader`s preparation guide for Operational Readiness Reviews (ORR)  

SciTech Connect (OSTI)

This document provides instructions, explanations, and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the team leader, team members, and review coordinator are outlined. Sample forms and correspondence are included in appendices. Although this document is for use by DOE ORR team leaders, it can be used by contractor ORR team leaders also.

Not Available

1994-09-01T23:59:59.000Z

297

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Whidbey Island, WA, that scores HERS 37 without PV or HERS -13 with 10 kW PV, enough to power the home and an electric car. The two-story custom home...

298

DOE Zero Energy Ready Home Case Study, Weiss Building & Development, LLC., Custom Home, Downer Grove, IL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Downers Grove, IL that scored HERS 35 without PV. This 3,600 ft2 custom home has advanced framed walls with R-23 dense-packed fiberglass plus R-13 rigid polyiso, a sealed attic with open-cell spray foam, a pier foundation, and 95% efficient gas furnace.

299

DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc., Albuquerque, NM, Production  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Aztec, NM that scored HERS 49 without PV. This 2,064 ft2 production home has advance framed walls, a spray foamed attic, an air source heat pump, and an HRV.

300

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Midland, MI, that scored HERS 49 without PV or HERS 44 with 1.4 kW of PV. The custom home served as a prototype and energy efficiency demonstration...

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Zero Energy Ready Home Case Study: KB Home, Lancaster, CA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Lancaster, CA, that achieved a HERS 43 without PV 43 or HERS 0 with 6.9-kW PV. The two-story, 2,537ft2 home serves as a model for the production...

302

DOE Zero Energy Ready Home Case Study, KB Home, San Marcos, CA, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in San Marcos, CA that scored HERS 52 without PV, -4 with PV. This 52,778 ft2 production home has R-20 advanced framed walls with batts plus rigid foam sheathing, an air-source heat pump for central air in sealed attic, solar water heating and 100% LED lighting.

303

DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston, SC  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Johns Island in Charleston, SC, that scored HERS 30 without PV, or HERS 1 with 6-kW of PV. This custom 2-story, 2,085 ft2, home is constructed of...

304

DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman, UT, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Herriman, UT, that scored HERS 40 without PV, -1 with PV. This 4,111 ft2 production home has R-23 advanced framed walls, and a vented attic with R-60 blown fiberglass.

305

Physics and Astronomy Department San Francisco State University Physics Readiness Exam  

E-Print Network [OSTI]

Physics and Astronomy Department San Francisco State University Physics Readiness Exam Math Qualification Test for Introductory Physics ­ Physics 111 or Physics 220 In addition to meeting course prerequisites, students wishing to enroll in Physics 111 or Physics 220 must demonstrate adequate competence

Golterman, Maarten

306

Inclusive Computer Science Education Using a Ready-made Computer Game Framework  

E-Print Network [OSTI]

Inclusive Computer Science Education Using a Ready-made Computer Game Framework Joseph Distasio and Thomas P. Way Applied Computing Technology Laboratory Department of Computing Sciences Villanova the prevailing interest in computer games among college students, both for entertainment and as a possible career

Way, Thomas

307

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott Valley, AZ  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in northern AZ that achieved a HERS score of 48 without PV or 25 if 3.5 kW PV were added. The two-story, 2,469-ft2 production home has 2x4 walls filled...

308

DOE Zero Energy Ready Home Case Study: AquaZephyr, Ithaca, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Ithaca, NY, that achieves a HERS 56 without PV or HERS 15 with 4-kW of PV. The two-story, 1,664-ft2 home is one of 17 single-family and 4 duplex homes...

309

DOE Zero Energy Ready Home Case Study: John Hubert Associates, North Cape May, NJ  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in North Cape May, NJ, that scored a HERS 46 without PV or HERS 9 with 6.5 kW of PV. The two-story, 1,871-ft2 home has advanced-framed above-grade walls...

310

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Houston, TX, that achieves a HERS 45 without PV or HERS 32 with 1.2 kW PV. The three-story, 4,507-ft2 custom home is powered by a unique tri-generation...

311

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom Homes, Double Oak, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Double Oak, TX, north of Dallas, that scored a HERS 44 without PV. The 3,752-ft2 two-story home served as an energy-efficient model home for the custom...

312

DOE Zero Energy Ready Home Case Study: The Imery Group, Serenbe, GA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Serenbe, GA, that scored a HERS 40 without PV or HERS -10 with PV. The 2,811-ft2, two-story custom home has 2x6, advanced framed walls filled with R-20...

313

DOE Zero Energy Ready Home Case Study, New Town Builders, Denver, CO, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Denver, CO that scored HERS 41 without PV, HERS 3 with PV. This 3,560 ft2 production home has R-36 double-stud walls, a vented attic with R-50 blown fiberglass, and a 97% efficient gas furnace with ducts in conditioned space.

314

Philadelphia Gas Works Looking for a challenge and ready to power up your career?  

E-Print Network [OSTI]

Philadelphia Gas Works Looking for a challenge and ready to power up your career? The Philadelphia Gas Works (PGW) is the largest municipally-owned gas utility in the nation, supplying gas service into the large, modern facility that exists today. As one of the nation's leading natural gas providers, PGW

Plotkin, Joshua B.

315

DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Edgewater, FL, that achieves a HERS score of 49 without PV. The one-story, 1,250-ft2 home has 2x4 walls with fiberglass batt inside plus R-3...

316

Explicit-Ready Nonlinear Model Predictive Control for Turbocharged Spark-Ignited Engines  

E-Print Network [OSTI]

Explicit-Ready Nonlinear Model Predictive Control for Turbocharged Spark- Ignited Engines J. El with saturated actuators. In this context, the need for model-based control laws is greater than ever with saturated actuators. In this paper, we evaluate the benefits of a nonlinear model predictive control (NMPC

Paris-Sud XI, Université de

317

DOE Zero Energy Ready Home Case Study: Greenhill Contracting, New Paltz, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in New Paltz, NY, that achieved a HERS score of 37 without PV or 7 with 7.5-kW PV. The two-story 2,288-ft2 home is one of 9 certified homes. All of the...

318

A System Architecture for Sharing De-Identified, Research-Ready Brain Scans  

E-Print Network [OSTI]

A System Architecture for Sharing De-Identified, Research-Ready Brain Scans and Health Information Department of Radiology Abstract. Progress in our understanding of brain disorders increasingly relies on the costly collection of large standardized brain magnetic resonance imaging (MRI) data sets. Moreover

Chervenak, Ann

319

DOE Zero Energy Ready Home Case Study: Brookside Development, Derby, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Derby, CT, that achieves a HERS score of 45 without PV or HERS 26 with PV. The production home is one of a development of 7 two-story, 4,000+-ft2...

320

Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report  

SciTech Connect (OSTI)

This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

Wight, R.H.

1997-05-30T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Charlestown, RI, that achieved a HERS Index of 47 without PV. The 2,244-ft2 two-story home with basement has 2x6 walls filled with 5.5 in. ...

322

DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Exeter, Rhode Island, that scored HERS 43 without PV. This 2,000 ft2 custom home has a spray- foamed attic and walls, plus rigid foam sheathing, ducted mini-split heat pumps, and an HRV.

323

Organizational readiness for innovation in health care: some lessons from the recent literature  

E-Print Network [OSTI]

- vation) is unlikely. Furthermore, innovation must compete with other goals of health-care reformPA P E R S Organizational readiness for innovation in health care: some lessons from the recent innovation in health care, as the interaction between the innovation and the context of its introduction

Birmingham, University of

324

DOE Zero Energy Ready Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable  

Broader source: Energy.gov [DOE]

Case-study of a DOE Zero Energy Ready Home in Ellenton, FL that scored HERS 53 without PV, HERS 23 with PV. This 1,143 ft2 affordable home has R-23 ICF walls, a spray-foamed sealed attic, solar hot water, and a ducted mini-split heat pump.

325

DOE Zero Energy Ready Home Case Study: New Town Builders, Denver, CO  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Denver, CO, that achieves HERS 38 without PV or HERS -3 with 8.0 kW of PV. The 2,115-ft2 two-story production home has 9.5-in.-thick double-stud walls...

326

User readiness to interact with information systems - a human activity perspective  

E-Print Network [OSTI]

This study focuses on how and why people become ready to interact with certain information systems (IS) based on their previous experiences with the same and/or similar systems. User-system interaction can be regarded as a mediated and collaborative...

Sun, Jun

2006-10-30T23:59:59.000Z

327

MOVIE "CHICAGO CITY COUNCIL: READY FOR REFORM?" (27 minutes/color)  

E-Print Network [OSTI]

, transportation, and health care. 8. Investigate how many of the reform proposals were in place twenty years afterMOVIE ­ "CHICAGO CITY COUNCIL: READY FOR REFORM?" (27 minutes/color) SYNOPSIS Following the death of Mayor Harold Washington, residents and reformers of Chicago still hoped for continued reform in Chicago

Illinois at Chicago, University of

328

DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom Home, New Fairfield, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in west Connecticut that scored HERS 39 without solar PV. The 3,000 ft2 two-story home has R-33 double-walls, R-72 flat roof with closed-cell foam and blown cellulose, an ERV, and LED lighting.

329

DOE Zero Energy Ready Home Case Study, e2Homes, Winterpark, FL, Custom Homes  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Winter Park, FL that scored HERS 57 without PV or HERS -7 with PV. This 4,305 ft2 custom home has autoclaved aerated concrete walls, a sealed attic with R-20 spray foam, and ductless mini-split heat pumps.

330

DOE Zero Energy Ready Home Case Study, Ithaca Neighborhood Housing Services, Ithaca, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Ithaca, NY, that scored HERS 50 without PV. These 1,160 ft2 affordable town houses have R-20 advance framed walls, R-52 blown cellulose in attic, radiant heat with 92.5 AFUE boiler, and triple-pane windows.

331

Japan ready to pay 895 million dollars more to host ITER project: report  

E-Print Network [OSTI]

Japan ready to pay 895 million dollars more to host ITER project: report 26 May 2004 Japan the deadlock between Japan and the European Union over the venue of the International Thermonuclear in the 10-billion-dollar project are the European Union, Japan, China, Russia, South Korea and the United

332

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

333

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

334

Mechanical Devices Readiness FY04.0402.3  

SciTech Connect (OSTI)

This project funded production process and tooling improvements to meet and sustain rate production for the W76-1 mechanism assemblies. Techniques were developed to allow evaluation and disposition of sealed stronglinks that resulted in prevention of the scrapping of numerous stronglinks and firesets. Improved processes and tooling allowed D-Test rates to be reduced in favor of E-Test, thus saving millions of dollars over the life of the program. Future system mechanisms will likely be smaller with tighter toleranced parts that will require improved inspection equipment and techniques. During the latter phase of this project, a method of improving inspection was developed that will have benefits for existing and future system mechanical assemblies.

John M. Fitzgerald

2008-10-21T23:59:59.000Z

335

Microsoft Word - Flash_09-04_Submission_requirements.doc  

Broader source: Energy.gov (indexed) [DOE]

4 1 4 1 June 26, 2009 DATE: June 12, 2009 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PMCDP CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Program Certification Process Requirement Change One June 12, 2009, the Certification Review Board (CRB) identified new requirements regarding timely submission of certification packages for CRB approval. Effective immediately, in order for Level 1 and 2 packages to be eligible for certification action at the next scheduled Board meeting, packages must successfully pass the independent review and OCEM approval phases no later than two weeks prior to that upcoming Board meeting. It is strongly recommended Level 1 and 2 packages ready for CRB consideration be submitted to

336

Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit  

Broader source: Energy.gov (indexed) [DOE]

NNSS-2011-04-28 NNSS-2011-04-28 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit Dates of Activity: 04/25/2011 - 04/28/2011 Report Preparer William Macon Activity Description/Purpose: In coordination with the National Nuclear Security Administration (NNSA) Service Center, the Office of Health, Safety and Security (HSS) site lead participated in a pre-visit for the NNSA Operational Readiness Review (ORR) of the Joint Actinide Shock Physics Experimental Research (JASPER) facility restart conducted April 25-28, 2011. The site lead also participated

337

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP)  

Broader source: Energy.gov (indexed) [DOE]

PRELIMINARY TECHNOLOGY PRELIMINARY TECHNOLOGY OF THE CALCINE Prepared by the U.S. Department of Energy ECHNOLOGY READINESS ASSESSMENT ALCINE DISPOSITION PROJECT VOLUME TWO Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC SSESSMENT ROJECT 412.09 (06/03/2009 - Rev. 11) CALCINE DISPOSITION PROJECT TECHNOLOGY MATURATION PLAN Identifier: Revision*: Page: PLN-1482 2 C-1 of C-317 Appendix C Appendix C Checklists for Critical Technology Elements and Technology Readiness Levels This appendix provides the CTE and TRL checklists for the CTEs. For the TRL questions that receive a "Y" (yes) response, the supporting documentation is provided with a complete reference at the

338

Are We Ready to Propose Guidelines for Health-Based Ventilation?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Are We Ready to Propose Guidelines for Health-Based Ventilation? Are We Ready to Propose Guidelines for Health-Based Ventilation? Speaker(s): Pawel Wargocki Date: October 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar Host/Point of Contact: Mark Mendell Guidelines for health-based ventilation in Europe are proposed. They follow the premise of controlling exposures to indoor air pollutants of both indoor and outdoor origin. Exposures are controlled through a two-step sequential approach, in which source control is the primary strategy, while ventilation is the secondary strategy once all options for source control have been fully implemented. World Health Organization (WHO) air quality (AQ) guidelines are used to set the exposure limits. A decision diagram is created for guidance through the process of source control and to aid in

339

Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide  

Broader source: Energy.gov (indexed) [DOE]

U U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS ............................................................................................................

340

Utility advanced turbine systems (ATS) technology readiness testing  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of a highly efficient, environmentally superior, and cost-competitive utility ATS for base-load utility-scale power generation, the GE 7H (60 Hz) combined cycle power system, and related 9H (50 Hz) common technology. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.

NONE

2000-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Utility Advanced Turbine Systems (ATS) technology readiness testing  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted horn DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include fill speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.

NONE

1999-05-01T23:59:59.000Z

342

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between Ge and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially be GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown. This report summarizes work accomplished from 4Q97 through 3Q98.

Unknown

1998-10-01T23:59:59.000Z

343

Utility Advanced Turbine Systems (ATS) Technology Readiness Testing  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown in Figure 1-1. This report summarizes work accomplished in 2Q98. The most significant accomplishments are listed in the report.

NONE

1998-10-29T23:59:59.000Z

344

Commercial Readiness of eSolar Next Generation Heliostat  

Science Journals Connector (OSTI)

Abstract eSolar has been designing small heliostats since the company's founding in 2007. One of the cornerstones of our approach to heliostat design is to deploy many factory-built small heliostats in high density fields. The fields are replicated and thus aggregated into solar plants supporting steam and molten salt electric power, integrated solar combined cycle (ISCC), and process heat applications, such as enhanced oil recovery and desalination. The small heliostat approach has been used in several pilot projects and was previously evolved into a commercially available product presented in 2011 at SolarPACES. In this paper we discuss the ground up redesign of our small heliostat hardware, with a focus of leveraging the proven approach into a higher reliability, globally applicable, more industrial, simple to source and most importantly total installed cost reduced solar collector product. During the redesign we discovered methods to simplify the design and confirmed that small, factory-built, affordable heliostats provide a compelling concentrated solar thermal technology. We discuss details on system optimization, concept selection and prototype development, including some results from design validation testing. Finally, we discuss how this new solar collector system (SCS5) performs and meets economic requirements. eSolar's SCS5 product will be commercially released early in 2014, and is currently available to quote for CSP projects.

P. Ricklin; M. Slack; D. Rogers; R. Huibregtse

2014-01-01T23:59:59.000Z

345

Financing and current capacity for REDD+ readiness and monitoring, measurement, reporting and verification in the Congo Basin  

Science Journals Connector (OSTI)

...Katzourakis Financing and current capacity for REDD+ readiness and monitoring, measurement, reporting and verification in the Congo Basin Danae Maniatis Jerome Gaugris Danilo Mollicone Joel Scriven Alexis Corblin Cleto Ndikumagenge Andre Aquino Philippe Crete...

2013-01-01T23:59:59.000Z

346

DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Phoenix, AZ that scored HERS 58 without PV or HERS 38 with PV. This 1,700 ft2 affordable home has R-21 framed walls, a sealed closed-cell spray foamed attic, an air-source heat pump with forced air, and a solar combo system that provides PV, hot water, and space heating.

347

DOE Zero Energy Ready Home Case Study, Weiss Building & Development, LLC., System Home, River Forest, IL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in River Forest, IL that scored HERS 17 without PV. This 4,763 ft2 custom passive house has R-54 ICF walls, a vented attic with R-100 blown fiberglass, plus R-40 rigid EPS under the slab, triple-pane windows, two ductless mini-split heat pumps, and redundant air sealing and flashing details.

348

DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville, WA, Systems Home  

Broader source: Energy.gov [DOE]

Case-study of a DOE Zero Energy Ready Home on Whidbey Island, WA, that scored HERS 45 without PV. This 2,908 ft2 custom/system home has a SIP roof and walls, R-20 rigid foam under slab, triple-pane windows, ground source heat pump for radiant floor heat, and a unique balanced ventilation system using separate exhaust fans to bring air into and out of home.

349

DOE Zero Energy Ready Home Case Study, Transformation, Inc., Production House, Devens, MA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Devens, MA that scored HERS 35 without PV or HERS -37 with PV. This 2,508 ft2 custom home has R-46 double-stud walls with opencell spray foam, a vented attic with R-67 blown cellulose, plus R-10 rigid XPS under the slab, R-20 closed-cell spray foam on basement walls, triple-pane windows, and one mini-split ductless heat pump.

350

DOE Zero Energy Ready Home Case Study, Transformations, Inc., Custom House, Devens, MA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Devens, MA that scored HERS 34 without PV or HERS -21 with PV. This 3,168 ft2 custom home has R-46 double-stud walls, a vented attic with R-67 blown cellulose, plus R-10 rigid XPS under the slab, R-20 closed-cell spray foam on basement walls, triple-pane windows, and mini-split ductless heat pumps.

351

DOE Zero Energy Ready Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Long Island, NY, that scored HERS 43 without PV. This 5,088 ft2 custom home has R-25 double-stud walls, a vaulted roof with R-40 blown cellulose, R-10 XPS under slab, a hydro air system with 91% efficient boiler for forced air and radiant floor heat, and 100% LED lights.

352

DOE Zero Energy Ready Home Case Study TC Legend, Seattle, WA, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 37 without PV, HERS -1 with PV. This 1,915 ft2 custom home has SIP walls and roof, R-20 XPS under the slab, triple-pane windows, an air to water heat pump for radiant heat, and balanced ventilation with timer controlled fans to bring in and exhaust air.

353

DOE Zero Energy Ready Home Case Study, Dwell Development, Seattle, WA, Systems Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 34 without PV. This 2,000 ft2 system home has R-45 double-stud walls, an unvented flat roof with 2 inches of spray foam plus 18 inches blown cellulose, R-42 XPS under slab, triple-pane windows, and a ductless mini-split heat pump.

354

DOE Zero Energy Ready Home Case Study, StreetScape Development, LLC, Libertyville, IL, Custom  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Libertyville, IL that scored HERS 45 without PV. This 2,763 ft2 custom home has advanced framed walls with R-20 of open-cell spray foam, R-49 open-cell spray-foam sealed attic, an HRV, and a tankless water heater for hydro coil furnace with high-velocity, small-diameter ducts.

355

15 Blog Posts to Get You Ready for Winter Savings | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15 Blog Posts to Get You Ready for Winter Savings 15 Blog Posts to Get You Ready for Winter Savings 15 Blog Posts to Get You Ready for Winter Savings October 13, 2009 - 1:25pm Addthis Allison Casey Senior Communicator, NREL On Saturday, I woke up to three inches of snow on the ground. THREE INCHES! On October 10th! Despite having grown up in what one of my college roommates lovingly referred to as the "TUNDRA!" (a.k.a, Wisconsin, and yes, she spoke this word in horrified all-caps), I am opposed to winter. I mean, I get that winter should not go away. Climate change is bad. And things like skiing, ice skating, snow forts, and hot chocolate do make winter a bit more bearable. But it's just so... cold. And icy. And dark. Unfortunately, hibernation isn't really an option, and-in addition to extra doses of whining from yours truly-all of those cold, dark days can

356

File:CCS EA 2012 Web-ready.pdf | Open Energy Information  

Open Energy Info (EERE)

CCS EA 2012 Web-ready.pdf CCS EA 2012 Web-ready.pdf Jump to: navigation, search File File history File usage Metadata File:CCS EA 2012 Web-ready.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 3.74 MB, MIME type: application/pdf, 77 pages) Summary Coyote Canyon South Geothermal Exploration EA from 2012 Licensing PD This file has been released into the public domain by the copyright holder, its copyright has expired, or it is ineligible for copyright. This applies worldwide.

357

Global e-readiness of web sites: a look at the top 50 companies  

Science Journals Connector (OSTI)

Today the globalisation of markets and the blurring of country borders leave no option for companies to contemplate whether they should go global. Even when their intended strategy is to be domestic, the changing competitive landscape forces them to take a global perspective. This scenario is further compounded by the fact that customers now come from all over the world through a relatively inexpensive channel ?? the Internet. Thus, what were once considered to be a purely domestic company is now being increasingly drawn into a global market due to the Internet. Hence the central question that one needs to ask is, ''Are companies gearing themselves to meet this need?'' and, if so ''Do their Web sites reflect such a strategy?'' In other words what is the global e-readiness of Web sites of so called ''big multinational corporations?'' This paper reviews the relevant literature on e-readiness and applies proposed typology to measure the e-readiness of Web sites of the top 50 global companies. Implications of this exploratory research are discussed from a managerial perspective.

Mahesh S. Raisinghani; Sri Beldona

2003-01-01T23:59:59.000Z

358

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of a highly efficient, environmentally superior, and cost-competitive utility ATS for base-load utility-scale power generation, the GE 7H (60 Hz) combined cycle power system, and related 9H (50 Hz) common technology. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown in Figure 1-1. Information specifically related to 9H production is presented for continuity in H program reporting, but lies outside the ATS program. This report summarizes work accomplished from 4Q98 through 3Q99. The most significant accomplishments are listed.

Unknown

1999-10-01T23:59:59.000Z

359

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer conflation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. The objective of this task is to design 7H and 9H compressor rotor and stator structures with the goal of achieving high efficiency at lower cost and greater durability by applying proven GE Power Systems (GEPS) heavy-duty use design practices. The designs will be based on the GE Aircraft Engines (GEAE) CF6-80C2 compressor. Transient and steady-state thermo-mechanical stress analyses will be run to ensure compliance with GEPS life standards. Drawings will be prepared for forgings, castings, machining, and instrumentation for full speed, no load (FSNL) tests of the first unit on both 9H and 7H applications.

Unknown

1999-04-01T23:59:59.000Z

360

Operational Readiness Review Final Report for K Basin Fuel Transfer System  

SciTech Connect (OSTI)

An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR Team did not have the opportunity to observe a shift turnover from one crew to another. The ORR Team has evaluated the risk of not observing this activity and considers the risk to be minimal based on the fact that operating staff are very familiar with the FTS equipment and its procedures, and because existing Conduct of Operations processes and procedures are adequate and implemented. Because the ORR Team has not observed two-shift FTS operations, we recommend that additional RL oversight be provided at the start of two-shift FTS operations to evaluate the adequacy of crew turnovers.

DAVIES, T.H.

2002-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Nuclear Energy Readiness Indicator Index (NERI): A benchmarking tool for assessing nuclear capacity in developing countries  

SciTech Connect (OSTI)

Declining natural resources, rising oil prices, looming climate change and the introduction of nuclear energy partnerships, such as GNEP, have reinvigorated global interest in nuclear energy. The convergence of such issues has prompted countries to move ahead quickly to deal with the challenges that lie ahead. However, developing countries, in particular, often lack the domestic infrastructure and public support needed to implement a nuclear energy program in a safe, secure, and nonproliferation-conscious environment. How might countries become ready for nuclear energy? What is needed is a framework for assessing a country's readiness for nuclear energy. This paper suggests that a Nuclear Energy Readiness Indicator (NERI) Index might serve as a meaningful basis for assessing a country's status in terms of progress toward nuclear energy utilization under appropriate conditions. The NERI Index is a benchmarking tool that measures a country's level of 'readiness' for nonproliferation-conscious nuclear energy development. NERI first identifies 8 key indicators that have been recognized by the International Atomic Energy Agency as key nonproliferation and security milestones to achieve prior to establishing a nuclear energy program. It then measures a country's progress in each of these areas on a 1-5 point scale. In doing so NERI illuminates gaps or underdeveloped areas in a country's nuclear infrastructure with a view to enable stakeholders to prioritize the allocation of resources toward programs and policies supporting international nonproliferation goals through responsible nuclear energy development. On a preliminary basis, the indicators selected include: (1) demonstrated need; (2) expressed political support; (3) participation in nonproliferation and nuclear security treaties, international terrorism conventions, and export and border control arrangements; (4) national nuclear-related legal and regulatory mechanisms; (5) nuclear infrastructure; (6) the utilization of IAEA technical assistance; (7) participation in regional arrangements; and (8) public support for nuclear power. In this paper, the Index aggregates the indicators and evaluates and compares the level of readiness in seven countries that have recently expressed various degrees of interest in establishing a nuclear energy program. The NERI Index could be a valuable tool to be utilized by: (1) country officials who are considering nuclear power; (2) the international community, desiring reassurance of a country's capacity for the peaceful, safe, and secure use of nuclear energy; (3) foreign governments/NGO's, seeking to prioritize and direct resources toward developing countries; and (4) private stakeholders interested in nuclear infrastructure investment opportunities.

Saum-Manning,L.

2008-07-13T23:59:59.000Z

362

Tucson - Solar Design Requirement for Homes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Tucson - Solar Design Requirement for Homes Tucson - Solar Design Requirement for Homes Tucson - Solar Design Requirement for Homes < Back Eligibility Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Arizona Program Type Building Energy Code Provider City of Tucson Tucson adopted an ordinance in June 2008 that requires all new single-family homes and duplexes in Tucson to be "solar-ready." The ordinance was developed by a stakeholder group which included Technicians for Sustainability, the Tucson Association of Realtors, the Sierra Club, the Southern Arizona Homebuilders Association, architectural professionals, solar energy companies and elements of the city government. The ordinance requires all new homes either to have a photovoltaic (PV) and solar water

363

Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. The Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.

Schaus, P.S.

1998-01-06T23:59:59.000Z

364

Workforce Retention Accomplishments Presentation - Sustainability Assessment of Workforce Well-Being and Mission Readiness  

Broader source: Energy.gov (indexed) [DOE]

Sustainability Assessment of Workforce Sustainability Assessment of Workforce Well-Being and Mission Readiness Jodi M. Jacobson, Ph.D., University of Maryland 2 Illness and Injury Lost Work Time Generational Divide Recruitment & Retention Competition Retirement & Aging Workforce Health & Well-Being Stress Depression & Anxiety Budget Cuts Technology Talent Management Work/Life Balance Safety Accountability Security Leadership Development Workforce Sustainability Chronic Health Conditions Globalization Critical Skills Shortage Job Skill Re-Alignment Job Transitioning Healthcare Costs YOU ARE NOT ALONE! 3 Indirect Costs  "You can"t manage what you can"t measure" (Dr. Ron Goetzel, Director, Institute for Health & Productivity Studies, Cornell University)

365

AVTA: Reports on Plug-in Electric Vehicle Readiness at 3 DOD Facilities  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports analyze data and survey results on readiness for the use of plug-in electric vehicles on the Naval Air Station Jacksonville, Naval Station Mayport, and Joint Base Lewis McChord, as informed by the AVTA's testing on plug-in electric vehicle charging equipment. This research was conducted by Idaho National Laboratory.

366

DOE Zero Energy Ready Home: Healthy Efficient Homes- Spirit Lake, Iowa  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Spirit Lake, Iowa, that scored HERS 41 without PV and HERS 28 with PV. This 3,048 ft2 custom home has advanced framed walls filled with 1.5 inches closed-cell spray foam, a vented attic with spray foam-sealed top plates and blown fiberglass over the ceiling deck. R-23 basement walls are ICF plus two 2-inch layers of EPS. The house also has a mini-split heat pump, fresh air fan intake, and a solar hot water heater.

367

Data Center Energy Efficiency and Renewable Energy Site Assessment: Anderson Readiness Center; Salem, Oregon  

SciTech Connect (OSTI)

This report summarizes the results from the data center energy efficiency and renewable energy site assessment conducted for the Oregon Army National Guard in Salem, Oregon. A team led by NREL conducted the assessment of the Anderson Readiness Center data centers March 18-20, 2014 as part of ongoing efforts to reduce energy use and incorporate renewable energy technologies where feasible. Although the data centers in this facility account for less than 5% of the total square footage, they are estimated to be responsible for 70% of the annual electricity consumption.

Metzger, I.; Van Geet, O.

2014-06-01T23:59:59.000Z

368

DOE Zero Energy Ready Home Case Study, Preferred Builders, Old Greenwich, CT, Custom  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Old Greenwich CT, that scored HERS 42 without PV or HERS 20 with PV. This 2,700 ft2 custom home has advanced framed walls with R-24 blown cellulose plus R-7.5 EPS rigid foam, membrane-coated OSB, a close-cell spray foamed attic, R-13 closed-cell spray foam under the slab and on basement walls, an ERV, and a gas boiler for forced air and radiant floor heat.

369

DOE-HDBK-3012-2003; DOE Handbook Guide to Good Practices for Operational Readiness Reviews (ORR) Team Leader's Guide  

Broader source: Energy.gov (indexed) [DOE]

NOT MEASUREMENT NOT MEASUREMENT SENSITIVE DOE-HDBK-3012-2003 SUPERSEDING DOE-HDBK-3012-96 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR OPERATIONAL READINESS REVIEWS (ORR) TEAM LEADER'S GUIDE U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-3012-2003 FOREWORD This Department of Energy handbook, Guide to Good Practices for Conducting Operational Readiness Reviews (ORR) Team Leader's Handbook, is approved for use by all DOE Components and their contractors. The guidance in this document is the distillation of the experience and lessons learned during numerous operational readiness reviews contributed by team leaders with a wide range of backgrounds. There are

370

New Developments in the Technology Readiness Assessment Process in US DOE-EM - 13247  

SciTech Connect (OSTI)

A Technology Readiness Assessment (TRA) is a systematic, metric-based process and accompanying report that evaluates the maturity of the technologies used in systems; it is designed to measure technology maturity using the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration (NASA) in the 1980's. More recently, DoD has adopted and provided systematic guidance for performing TRAs and determining TRLs. In 2007 the GAO recommended that the DOE adopt the NASA/DoD methodology for evaluating technology maturity. Earlier, in 2006-2007, DOE-EM had conducted pilot TRAs on a number of projects at Hanford and Savannah River. In March 2008, DOE-EM issued a process guide, which established TRAs as an integral part of DOE-EM's Project Management Critical Decision Process. Since the development of its detailed TRA guidance in 2008, DOE-EM has continued to accumulate experience in the conduct of TRAs and the process for evaluating technology maturity. DOE has developed guidance on TRAs applicable department-wide. DOE-EM's experience with the TRA process, the evaluations that led to recently developed proposed revisions to the DOE-EM TRA/TMP Guide; the content of the proposed changes that incorporate the above lessons learned and insights are described. (authors)

Krahn, Steven [Department of Civil and Environmental Engineering, Vanderbilt University, Nashville, TN, 37235 (United States)] [Department of Civil and Environmental Engineering, Vanderbilt University, Nashville, TN, 37235 (United States); Sutter, Herbert [Consultant, 910 Laurel Green Dr., North Canton, OH, 44720 (United States)] [Consultant, 910 Laurel Green Dr., North Canton, OH, 44720 (United States); Johnson, Hoyt [DOE-EM, 1000 Independence Ave., Washington, DC, 20585 (United States)] [DOE-EM, 1000 Independence Ave., Washington, DC, 20585 (United States)

2013-07-01T23:59:59.000Z

371

X-25 Cryo-ready In-vacuum Undulator at the NSLS  

SciTech Connect (OSTI)

The existing 15-year-old hybrid wiggler at the NSLS has been replaced by a state-of-the-art, cryo-ready in-vacuum undulator optimized for a dedicated macromolecular crystallography program. The device is a 1m long, 18mm period, hybrid PM-type with a minimum operating gap of 5.6mm, and has provision for cryo-cooling to 150K. Unlike the original SPring-8 cryo-PM undulator proposal, we use a new high-remanence, high-temperature grade of NdFeB (NEOMAX 42AH with Br=1.3T and Hcj=24 kOe) that can be baked to 100 deg. C to be UHV-ready in case of cooling system failure. A novel optical gap measurement system using a LED-based product ensures gap accuracy of {+-}2 micro meter. A friction stir welding technique is used for the first time in an accelerator UHV device to minimize stress and deformation of the magnet arrays due to temperature gradients. This paper describes design issues of the device and other considerations such as magnetic measurement at low temperature.

Tanabe, Toshiya; Ablett, James; Berman, Lonny; Harder, David A.; Hulbert, Steve; Lehecka, Mike; Rakowsky, George; Skaritka, John [National Synchrotron Light Source, Brookhaven National Laboratory, Upton, NY 11973 (United States); Deyhim, Alex; Johnson, Eric; Kulesza, Joe; Waterman, Dave [Advanced Design Consulting, U.S.A, Inc., 126 Ridge Rd, PO Box 187, Lansing, NY 14882 (United States)

2007-01-19T23:59:59.000Z

372

Use of Residual Solids from Pulp and Paper Mills for Enhancing Strength and Durability of Ready-Mixed Concrete  

SciTech Connect (OSTI)

This research was conducted to establish mixture proportioning and production technologies for ready-mixed concrete containing pulp and paper mill residual solids and to study technical, economical, and performance benefits of using the residual solids in the concrete. Fibrous residuals generated from pulp and paper mills were used, and concrete mixture proportions and productions technologies were first optimized under controlled laboratory conditions. Based on the mixture proportions established in the laboratory, prototype field concrete mixtures were manufactured at a ready-mixed concrete plant. Afterward, a field construction demonstration was held to demonstrate the production and placement of structural-grade cold-weather-resistant concrete containing residual solids.

Tarun R. Naik; Yoon-moon Chun; Rudolph N. Kraus

2003-09-18T23:59:59.000Z

373

Report of independent consultants reviewing Integrated Test Stands (ITS) performance and readiness of DARHT for construction start  

SciTech Connect (OSTI)

Independent consultants met at Los Alamos, June 15 and 16, 1993, to review progress on the commissioning of the Integrated Test Stand (ITS) for DARHT and to provide DOE with technical input on readiness for construction of the first radiographic arm of DARHT. The consultants concluded that all milestones necessary for demonstrating the performance of the DARHT accelerator have been met and that the project is ready for construction to resume. The experimental program using ITS should be continued to quantify the comparison of experiment and theory, to test improvements on the injector insulator, and to better evaluate the interaction of the beam and the target.

Not Available

1993-08-01T23:59:59.000Z

374

Energy Savings 101: No Prerequisite Required | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Savings 101: No Prerequisite Required Energy Savings 101: No Prerequisite Required Energy Savings 101: No Prerequisite Required August 22, 2013 - 10:33am Addthis By taking energy savings into account when you move in this year, you can put some money back in your pocket. | Photo courtesy of ©iStockphoto/ArtBoyMB By taking energy savings into account when you move in this year, you can put some money back in your pocket. | Photo courtesy of ©iStockphoto/ArtBoyMB Christina Stowers Communications Specialist in the Office of Weatherization and Intergovernmental Program How can I participate? Check your lighting, window coverings, and appliances to make sure you are as energy-efficient as possible this year. Are you ready? You've packed up all of your ultra-mobile plastic sets of drawers, brightly colored furnishings, sweatpants and hoodies, and school

375

Energy Savings 101: No Prerequisite Required | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Savings 101: No Prerequisite Required Savings 101: No Prerequisite Required Energy Savings 101: No Prerequisite Required August 22, 2013 - 10:33am Addthis By taking energy savings into account when you move in this year, you can put some money back in your pocket. | Photo courtesy of ©iStockphoto/ArtBoyMB By taking energy savings into account when you move in this year, you can put some money back in your pocket. | Photo courtesy of ©iStockphoto/ArtBoyMB Christina Stowers Communications Specialist in the Office of Weatherization and Intergovernmental Program How can I participate? Check your lighting, window coverings, and appliances to make sure you are as energy-efficient as possible this year. Are you ready? You've packed up all of your ultra-mobile plastic sets of drawers, brightly colored furnishings, sweatpants and hoodies, and school

376

OM Code Requirements For MOVs -- OMN-1 and Appendix III  

SciTech Connect (OSTI)

The purpose or scope of the ASME OM Code is to establish the requirements for pre-service and in-service testing of nuclear power plant components to assess their operational readiness. For MOVs this includes those that perform a specific function in shutting down a reactor to the safe shutdown condition, maintaining the safe shutdown condition, and mitigating the consequences of an accident. This paper will present a brief history of industry and regulatory activities related to MOVs and the development of Code requirements to address weaknesses in earlier versions of the OM Code. The paper will discuss the MOV requirements contained in the 2009 version of ASME OM Code, specifically Mandatory Appendix III and OMN-1, Revision 1.

Kevin G. DeWall

2011-08-01T23:59:59.000Z

377

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contractor Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

378

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012  

Broader source: Energy.gov (indexed) [DOE]

Contractor Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

379

Expressive participation in Internet social movements: Testing the moderating effect of technology readiness and sex on student SNS use  

Science Journals Connector (OSTI)

An understanding of students' use of social networking sites (SNS) for expressive participation in Internet Social Movements (ISMs) is absent in the literature on the social psychology of student social networking behavior. Using the Unified Theory of ... Keywords: Gender, Internet social movement, Sex, Social networking sites, Technology readiness, UTAUT

Juan D. Borrero; Shumaila Y. Yousafzai; Uzma Javed; Kelly L. Page

2014-01-01T23:59:59.000Z

380

Financing and current capacity for REDD+ readiness and monitoring, measurement, reporting and verification in the Congo Basin  

Science Journals Connector (OSTI)

...measurement, reporting and verification in the Congo Basin Danae Maniatis 1 2 Jerome Gaugris...current capacity for REDD+ readiness in the Congo Basin, with a particular focus on the...amount of REDD+ financing flows into the Congo Basin (US$550 million or almost half...

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

The role of technology readiness in consumers' adoption of mobile internet services between South Korea and China  

Science Journals Connector (OSTI)

This study built a causal model using the technology readiness and acceptance model TRAM to identify the factors influencing the adoption of mobile internet services in South Korea and China. In order to compare South Korea and China, a survey was conducted ...

Jong Chul Oh; Sung Joon Yoon; Namho Chung

2014-05-01T23:59:59.000Z

382

Getting Ready for LEDs: LED Lighting Video Series Explains the Basics |  

Broader source: Energy.gov (indexed) [DOE]

for LEDs: LED Lighting Video Series Explains the for LEDs: LED Lighting Video Series Explains the Basics Getting Ready for LEDs: LED Lighting Video Series Explains the Basics November 26, 2012 - 3:09pm Addthis Part 1 of the ElectricTV.net video series. Part 2 of the ElectricTV.net video series. Roland Risser Roland Risser Program Director, Building Technologies Office How can I participate? Learn more about the advantages and accessiblity of LED lighting from this series of videos. If you haven't been down the lighting aisle of your favorite home improvement store lately, you may be surprised at how many LED lighting products have arrived. Solid-state lighting (LEDs are one type) will soon have a strong impact on how buildings and homes are lit, in part because of its potential to reduce U.S. lighting energy usage by nearly one half.

383

Building America Top Innovations 2013 Profile … Zero Energy-Ready Single-Family Homes  

Broader source: Energy.gov (indexed) [DOE]

to purchase and install. to purchase and install. Much of Building America's research is aimed directly at the goal of constructing high-performance homes and many of the Building America research teams have been directly involved with builders who are constructing zero energy or zero energy-ready homes. Here are just a few examples. The Consortium for Advanced Residential Buildings, operated by Steven Winter Associates, worked with Preferred Builders, Inc., on a high-performance test home in Old Greenwich, CT. Technologies and strategies used in the "Performance House" were not cutting-edge, but simply "best practices practiced." Closed-cell spray foam insulated the unvented attic and the interior of the foundation wall and wrapped the underside and sides of the slab while 1.5 inches of rigid foam sheathing covered the

384

DOE-HDBK-3012-96; Team Leader's Preparation Guide for Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

INCH-POUND INCH-POUND DOE-HDBK-3012-96 June 1996 SUPERSEDING DOE-HDBK-3012-94 September 1994 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR OPERATIONAL READINESS REVIEWS (ORR) TEAM LEADER'S GUIDE U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE96009471 DOE-HDBK-3012-96 iii FOREWORD This Department of Energy handbook, Guide to Good Practices for Conducting Operational

385

NETL: News Release - Climate Technology: DOE Readies First Big U.S.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 , 2007 3 , 2007 Climate Technology: DOE Readies First Big U.S. Projects in CO2 Capture and Storage Regional Partnerships' Effort Could Triple World's Largest Demonstration, Blaze Trails WASHINGTON, DC - The U.S. Department of Energy is preparing to commission this year America's first large-scale demonstrations of CO2 capture and deep geologic storage in fulfillment of a commitment announced last October to Phase III of the Carbon Sequestration Regional Partnerships Program. The projects could lead to a tripling of the world's present large-scale demonstrations. MORE INFO Learn more about DOE's Carbon Sequestration Regional Partnerships Program Proposals for the Phase III demonstrations, part of the President's Climate Change Technology Initiative, include the world's earliest examination of

386

Super efficient refrigeration systems: Two non-CFC designs ready for commercialization  

SciTech Connect (OSTI)

Two high-efficiency prime movers for refrigeration are ready for field testing and commercialization. Either machine, combined with other advanced measures, could result in a CFC-free refrigerator using significantly less energy than units meeting the 1993 US efficiency standards. The first design is a linear motor/compressor that manufacturers could substitute for the standard rotating motor/compressor in a conventional refrigerator. The second design is a Stirling-cycle refrigeration machine that is self contained and uses helium gas as the working fluid. The results of prototype testing, the inherent simplicity of both machines, and their virtually frictionless operation point to economical and reliable service. If these features are confirmed in further testing now being conducted by appliance and compressor manufacturers, these machines will be strong candidates for inclusion in super efficient refrigerator designs over the next few years.

Stickney, B.L.

1992-12-31T23:59:59.000Z

387

Design and application of multivariate CUSUM for quality monitoring of ready mixed concrete  

Science Journals Connector (OSTI)

Multivariate CUSUM control charts provide a unified scheme to monitor process mean and variability when there are multiple processes that need to be monitored to track the problem causing a change in the quality characteristic of the process. This paper aims at developing a set of multivariate CUSUM control charts for monitoring the quality of ready mixed concrete. On analysing available grades of concrete produced by two commercial batching plants in Ahmedabad, India, it has been observed that after application of multivariate CUSUM control charts along with V mask, if the identified point is the same for three or more quality characteristic then definitely there is a strong indication about occurrence of a problem at that point. The root cause investigation at the identified point would reveal the cause of the change in strength. The remedial action would be to modify the mix design and improve the quality of materials and workmanship.

Debasis Sarkar; Biswajit Bhattacharjee

2014-01-01T23:59:59.000Z

388

Building America Top Innovations 2013 Profile … Zero Energy-Ready Single-Family Homes  

Broader source: Energy.gov (indexed) [DOE]

for purchase and installation. for purchase and installation. Building America's research is aimed at the goal of constructing high- performance homes and many of the Building America research teams have worked directly with builders to construct zero energy or zero energy-ready homes. Here are just a few examples. The Consortium for Advanced Residential Buildings, operated by Steven Winter Associates, worked with Preferred Builders, Inc., on a high-performance test home in Old Greenwich, CT. Technologies and strategies used in the "Performance House" were not cutting-edge, but simply "best practices practiced." Closed-cell spray foam insulated the unvented attic and the interior of the foundation wall and wrapped the underside and sides of the slab while 1.5 inches of rigid foam sheathing covered the

389

Summary Report: Clean Cities Plug-In Electric Vehicle Community Readiness Partners Discussion Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2101 Wilson Blvd., Suite 550 | Arlington, VA 22201 | 703-516-4146 | www.C2ES.org 2101 Wilson Blvd., Suite 550 | Arlington, VA 22201 | 703-516-4146 | www.C2ES.org MAY 7, 2012 4:30 PM - 6:00 PM LOS ANGELES, CA SUMMARY REPORT: CLEAN CITIES PLUG-IN ELECTRIC VEHICLE COMMUNITY READINESS PARTNERS DISCUSSION GROUP By: Nick Nigro, Center for Climate and Energy Solutions An opportunity to discuss challenges and share best practices regarding efforts to prepare your community/region for plug-in electric vehicles and charging infrastructure deployment Center for Climate and Energy Solutions 2 Table of Contents Table of Contents 2 About this Report 3 Disclaimer 3 Acknowledgements 3 Session Overview 4 Vehicle Demand and Availability 4 Law and Regulatory Environment 5 Public EVSE Signage 5 ADA Compliance 7 Multi-unit Dwellings 7

390

Feed tank transfer requirements  

SciTech Connect (OSTI)

This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

Freeman-Pollard, J.R.

1998-09-16T23:59:59.000Z

391

Hydrogen Infrastructure Market Readiness: Opportunities and Potential for Near-term Cost Reductions. Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the Hydrogen Station Cost Calculator  

Broader source: Energy.gov [DOE]

Recent progress with fuel cell electric vehicles (FCEVs) has focused attention on hydrogen infrastructure as a critical commercialization barrier. With major automakers focused on 2015 as a target timeframe for global FCEV commercialization, the window of opportunity is short for establishing a sufficient network of hydrogen stations to support large-volume vehicle deployments. This report describes expert feedback on the market readiness of hydrogen infrastructure technology from two activities.

392

Hydrogen Infrastructure Market Readiness: Opportunities and Potential for Near-term Cost Reductions; Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the Hydrogen Station Cost Calculator  

SciTech Connect (OSTI)

Recent progress with fuel cell electric vehicles (FCEVs) has focused attention on hydrogen infrastructure as a critical commercialization barrier. With major automakers focused on 2015 as a target timeframe for global FCEV commercialization, the window of opportunity is short for establishing a sufficient network of hydrogen stations to support large-volume vehicle deployments. This report describes expert feedback on the market readiness of hydrogen infrastructure technology from two activities.

Melaina, M. W.; Steward, D.; Penev, M.; McQueen, S.; Jaffe, S.; Talon, C.

2012-08-01T23:59:59.000Z

393

Feed tank transfer requirements  

SciTech Connect (OSTI)

This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

Freeman-Pollard, J.R.

1998-09-16T23:59:59.000Z

394

ALUMINUM READINESS EVALUATION FOR ALUMINUM REMOVAL AND SODIUM HYDROXIDE REGENRATION FROM HANFORD TANK WASTE BY LITHIUM HYDROTALCITE PRECIPITATION  

SciTech Connect (OSTI)

A Technology Readiness Evaluation (TRE) performed by AREV A Federal Services, LLC (AFS) for Washington River Protection Solutions, LLC (WRPS) shows the lithium hydrotalcite (LiHT) process invented and patented (pending) by AFS has reached an overall Technology Readiness Level (TRL) of 3. The LiHT process removes aluminum and regenerates sodium hydroxide. The evaluation used test results obtained with a 2-L laboratory-scale system to validate the process and its critical technology elements (CTEs) on Hanford tank waste simulants. The testing included detailed definition and evaluation for parameters of interest and validation by comparison to analytical predictions and data quality objectives for critical subsystems. The results of the TRE would support the development of strategies to further mature the design and implementation of the LiHT process as a supplemental pretreatment option for Hanford tank waste.

SAMS TL; MASSIE HL

2011-01-27T23:59:59.000Z

395

User Requirements Gathered for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshops to derive and document each DOE SC Office's HPC requirements for NERSC in 2013-14" * Deliverables: Reports that includes both the HPC requirements and supporting...

396

BES Science Network Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of...

397

Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections), Novvember 2011  

Broader source: Energy.gov (indexed) [DOE]

Argonne National Laboratory Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections) May 2011 November 2011 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Scope ...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 1

398

Getting Ready to Set the Thermostat Low-And Keep it There! | Department  

Broader source: Energy.gov (indexed) [DOE]

to Set the Thermostat Low-And Keep it There! to Set the Thermostat Low-And Keep it There! Getting Ready to Set the Thermostat Low-And Keep it There! October 26, 2011 - 6:48am Addthis Elizabeth Spencer Communicator, National Renewable Energy Laboratory Every year I try to convince myself that I am going to turn my thermostat down for the entire winter. It's going to be 68 degrees or lower, I tell myself. I'm not going to turn it up for any reason. I might even be daring and try to get a few degrees lower! It'll be awesome! It usually doesn't end well. You see, I'm a gigantic wuss about the cold. Something always happens-it takes me 4 hours to drive home in the snow, I have a lousy day, or it drops beneath zero degrees Fahrenheit-and suddenly I want to treat myself to a balmy 70 degrees to make up for it.

399

Locating new coal-fired power plants with Carbon Capture Ready designA GIS case study of Guangdong province in China  

Science Journals Connector (OSTI)

Making new coal-fired power plants carbon capture ready (Carbon Capture Ready) in China has been recognised as a crucial by a number of stakeholders academics, energy companies and regional government, based on a study in EU-UK-China NZEC project. A number of publications have investigated the definition, engineering requirements, economic and finance of CCR for China. However there remain a number of questions regarding the extent to which a plants physical location might constrain the feasibility of CCS retrofit. To address this issue, a Geographical Information System (GIS) has been used as a tool for mapping current and planned large carbon dioxide sources in Guangdong, also illustrating potential storage sites and calculating possible carbon dioxide transportation route. This paper investigates the location factors that should be considered when locating new build CCR power plants and demonstrates the methodology of using GIS software with spatial analysis in planning new build power plant in Guangdong. A preliminary study has identified over 30 large power plants within the region, with plant locations and historical emission data collected and presented in ArcGIS. Factors such as distance to potential storage site, route of CO2 pipeline, extra space on site and potential development plan etc. were investigated in the modelling and calculated the potential source and sink solution. The study then moves on to suggest possible new build plant locations which can be easily fitted in to the current network, based on economic optimisation. The scope for future coal plant development combined with a possible nuclear plant siting plan is discussed towards the end of the paper. Guangdong province, which owns the third largest coal-fired power installed capacity out of 31 provinces, generated over 8% of Chinas total electricity every year for the past 15 years. CO2 storage opportunities could be found in the surrounding South China Sea, where Guangdong has a total of 4,300km of coastline and some small scale oil fields on shore within the region. It is also among the first places to start the national open and reform policy in China. The province is one of the richest in China, with the highest GDP among all other provinces since 1989, and the foreign trade accounts for more than a quarter of Chinas total amount. It also contributes around 12of the total national economic output. Currently, the provincial government is proposing a low carbon roadmap, which is the first of its kind in China. The work has created a totally new thinking on capture ready power plant planning. This differs from existing studies (e.g., which aim to investigate the existing carbon dioxide emission sources at specified location and provide source and sink matching analysis. Instead the study focuses on policy implementation for new build capture ready power plants. Three clusters within Guangdong province are identified as potential temporary CO2 storage hubs before transporting the gas to a long term storage site. When officials are planning new power plant locations from a capture ready perspective, the plants should not necessarily be close to storage sites in straight line, but rather should be within a reasonable distance of a cluster. Transport of the captured CO2 will not be limited to pipelines, but could be extended to road and rail tankers. Power plant parameters and storage site data were collected for this research. Public transportation, utilities, landscapes, river, land used and population data were referenced from various sources; therefore, some of the data could be out of date. Nevertheless, it should still provide enough information when deciding the location of the transport cluster. Any future work could build on the existing model with updated data. Moreover, it could fit in with the national natural gas transportation network and utility planning network to provide long term integrated energy system analysis. The paper could provide policy makers, investors and urban planning officials with a view on how conventi

Jia Li; Tim Cockerill; Xi Liang; Jon Gibbins

2011-01-01T23:59:59.000Z

400

Expressive participation in Internet social movements: Testing the moderating effect of technology readiness and sex on student SNS use  

Science Journals Connector (OSTI)

Abstract An understanding of students use of social networking sites (SNS) for expressive participation in Internet Social Movements (ISMs) is absent in the literature on the social psychology of student social networking behavior. Using the Unified Theory of Acceptance and Use of Technology (UTAUT) as a theoretical framework and survey data collected from 214 students in Spain, we empirically test the UTAUT theory in this context. Our results confirm that effort expectancy, social influence, and performance expectancy significantly affect students intentions to use SNS for expressive participation in Internet social movements. We also test the moderating effect of students sex and Technology Readiness (TR) on these UTAUT relationships. Our results show that the intention to use SNS is strongly influenced by effort expectancy for female students and students with self-reported low-levels of technology readiness. For male students and students with self-reportinghigh-levels of technology readiness, the relationship is strongly influenced by social influence. The implications of our findings for theory and practice are discussed.

Juan D. Borrero; Shumaila Y. Yousafzai; Uzma Javed; Kelly L. Page

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Fuel-Flexible Gasification-Combustion Technology for Production of H2 and Sequestration-Ready CO2  

SciTech Connect (OSTI)

In the near future, the nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It is necessary to improve both the process efficiency and environmental impact of fossil fuel utilization including greenhouse gas management. GE Global Research (GEGR) investigated an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology with potential to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP technology offers the long-term potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions. GE was awarded a contract from U.S. DOE NETL to investigate and develop the UFP technology. Work started on the Phase I program in October 2000 and on the Phase II effort in April 2005. In the UFP technology, coal, water and air are simultaneously converted into (1) hydrogen rich stream that can be utilized in fuel cells or turbines, (2) CO{sub 2} rich stream for sequestration, and (3) high temperature/pressure vitiated air stream to produce electricity in a gas turbine expander. The process produces near-zero emissions with an estimated efficiency higher than Integrated Gasification Combined Cycle (IGCC) process with conventional CO{sub 2} separation. The Phase I R&D program established the chemical feasibility of the major reactions of the integrated UFP technology through lab-, bench- and pilot-scale testing. A risk analysis session was carried out at the end of Phase I effort to identify the major risks in the UFP technology and a plan was developed to mitigate these risks in the Phase II of the program. The Phase II effort focused on three high-risk areas: economics, lifetime of solids used in the UFP process, and product gas quality for turbines (or the impact of impurities in the coal on the overall system). The economic analysis included estimating the capital cost as well as the costs of hydrogen and electricity for a full-scale UFP plant. These costs were benchmarked with IGCC polygen plants with similar level of CO{sub 2} capture. Based on the promising economic analysis comparison results (performed with the help from Worley Parsons), GE recommended a 'Go' decision in April 2006 to continue the experimental investigation of the UFP technology to address the remaining risks i.e. solids lifetime and the impact of impurities in the coal on overall system. Solids attrition and lifetime risk was addressed via bench-scale experiments that monitor solids performance over time and by assessing materials interactions at operating conditions. The product gas under the third reactor (high-temperature vitiated air) operating conditions was evaluated to assess the concentration of particulates, pollutants and other impurities relative to the specifications required for gas turbine feed streams. During this investigation, agglomeration of solids used in the UFP process was identified as a serious risk that impacts the lifetime of the solids and in turn feasibility of the UFP technology. The main causes of the solids agglomeration were the combination of oxygen transfer material (OTM) reduction at temperatures {approx}1000 C and interaction between OTM and CO{sub 2} absorbing material (CAM) at high operating temperatures (>1200 C). At the end of phase II, in March 2008, GEGR recommended a 'No-go' decision for taking the UFP technology to the next level of development, i.e. development of a 3-5 MW prototype system, at this time. GEGR further recommended focused materials development research programs on improving the performance and lifetime of solids materials used in UFP or chemical looping technologies. The scale-up activities would be recommended only after mitigating the risks involved with the agglomeration and overall lifetime of the solids. This is the final report for the phase II of the DOE-funded Vision 21 program entitled 'Fuel-Flexible Gasification-Combustion Technology for Production of H{sub 2} and Sequestration-Ready CO{sub 2}' (DOE Award No.

Parag Kulkarni; Jie Guan; Raul Subia; Zhe Cui; Jeff Manke; Arnaldo Frydman; Wei Wei; Roger Shisler; Raul Ayala; om McNulty; George Rizeq; Vladimir Zamansky; Kelly Fletcher

2008-03-31T23:59:59.000Z

402

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental...

403

PIT Coating Requirements Analysis  

SciTech Connect (OSTI)

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

404

Transportation System Requirements Document  

SciTech Connect (OSTI)

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

Not Available

1993-09-01T23:59:59.000Z

405

Mandatory Supervisory Training Requirements  

Broader source: Energy.gov (indexed) [DOE]

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

406

ASCR Science Network Requirements  

E-Print Network [OSTI]

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

407

Transuranic Waste Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

1999-07-09T23:59:59.000Z

408

Science Requirements Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Presentations Galleries ESnet Awards and Honors ESnet Live Blog Home Science Engagement Science Requirements Reviews Science Engagement Move your data Programs...

409

2010 Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power and Material Handling Equipment Markets  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manufacturing Readiness Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power and Material Handling Equipment Markets Doug Wheeler DJW Technology Michael Ulsh National Renewable Energy Laboratory Technical Report NREL/TP-5600-53046 August 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 2010 Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power

410

Opportunities and barriers for implementing CO2 capture ready designs: A case study of stakeholder perceptions in Guangdong, China  

Science Journals Connector (OSTI)

China has been building at least 50 gigawatt (GW) of new coal-fired power plants every year since 2004. In the absence of CO2 capture ready (CCR) designs, a large fraction of new coal power plants built in the next decade could face carbon lock-in. Building on the existing engineering and economic literature on CO2 capture ready, the aim of this study is to understand the opportunities and challenges in implementing CCR in China. In early 2010, opinion-leaders perceptions towards implementing CCR in Guangdong with two empirical phases are presented: an online consultation of 31 respondents (out of a sample of 82), three face-to-face focus group discussions including 16 officials from five power plants and two oil companies in the Guangdong province. A majority of respondents in the online survey were engineers. The survey results are compared with an earlier study of stakeholders views on demonstrating CCS in China, conducted in April 2009 as part of the EUUKChina Near Zero Emissions Coal initiative (NZEC) project.

Jia Li; Xi Liang; Tim Cockerill; Jon Gibbins; David Reiner

2012-01-01T23:59:59.000Z

411

General Responsibilities and Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

1999-07-09T23:59:59.000Z

412

ADVERTISING MAJOR REQUIREMENTS CHECKLIST  

E-Print Network [OSTI]

ADVERTISING MAJOR REQUIREMENTS CHECKLIST Name: ID#: Expected Graduation Date: Course Number and Title Waiver/Substitution Semester Units FOUNDATION (16 units required) ADVT 341 Advertising Principles & Practice (4) PLUS COMS 202 Rhetoric and the Public Sphere (4) OR RHET 216 Writing for Advertising (4) PLUS

Galles, David

413

NISTIR 7933 Requirements and  

E-Print Network [OSTI]

NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type 18 #12;ii NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type/CTS designed to test implementations of ANSI/NIST-ITL 1- 2011 (AN-2011) "Data Format for the Interchange

414

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

415

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

416

High School if required  

E-Print Network [OSTI]

Chemistry II CHEM AP 4-5 Lab required @ UNLV; contact Chemistry PHYS 182 & 182L Engineering Physics III PHYS General Chemistry I CHEM AP 3 Lab required @ UNLV; contact Chemistry CHEM 241 Organic Chemistry I & CHEM 347 Lab Techniques of Organic Chem I CHEM 242 Organic Chemistry II & CHEM 348 Lab Techniques

Walker, Lawrence R.

417

Development of the Write Process for Pipeline-Ready Heavy Oil  

SciTech Connect (OSTI)

Work completed under this program advances the goal of demonstrating Western Research Institute's (WRI's) WRITE{trademark} process for upgrading heavy oil at field scale. MEG Energy Corporation (MEG) located in Calgary, Alberta, Canada supported efforts at WRI to develop the WRITE{trademark} process as an oil sands, field-upgrading technology through this Task 51 Jointly Sponsored Research project. The project consisted of 6 tasks: (1) optimization of the distillate recovery unit (DRU), (2) demonstration and design of a continuous coker, (3) conceptual design and cost estimate for a commercial facility, (4) design of a WRITE{trademark} pilot plant, (5) hydrotreating studies, and (6) establish a petroleum analysis laboratory. WRITE{trademark} is a heavy oil and bitumen upgrading process that produces residuum-free, pipeline ready oil from heavy material with undiluted density and viscosity that exceed prevailing pipeline specifications. WRITE{trademark} uses two processing stages to achieve low and high temperature conversion of heavy oil or bitumen. The first stage DRU operates at mild thermal cracking conditions, yielding a light overhead product and a heavy residuum or bottoms material. These bottoms flow to the second stage continuous coker that operates at severe pyrolysis conditions, yielding light pyrolyzate and coke. The combined pyrolyzate and mildly cracked overhead streams form WRITE{trademark}'s synthetic crude oil (SCO) production. The main objectives of this project were to (1) complete testing and analysis at bench scale with the DRU and continuous coker reactors and provide results to MEG for process evaluation and scale-up determinations and (2) complete a technical and economic assessment of WRITE{trademark} technology to determine its viability. The DRU test program was completed and a processing envelope developed. These results were used for process assessment and for scaleup. Tests in the continuous coker were intended to determine the throughput capability of the coker so a scaled design could be developed that maximized feed rate for a given size of reactor. These tests were only partially successful because of equipment problems. A redesigned coker, which addressed the problems, has been build but not operated. A preliminary economic analysis conducted by MEG and an their engineering consultant concluded that the WRITE{trademark} process is a technically feasible method for upgrading bitumen and that it produces SCO that meets pipeline specifications for density. When compared to delayed coking, the industry benchmark for thermal upgrading of bitumen, WRITE{trademark} produced more SCO, less coke, less CO{sub 2} per barrel of bitumen fed, and had lower capital and operating costs. On the other hand, WRITE{trademark}'s lower processing severity yielded crude with higher density and a different product distribution for naphtha, light gas oil and vacuum oil that, taken together, might reduce the value of the SCO. These issues plus the completion of more detailed process evaluation and economics need to be resolved before WRITE{trademark} is deployed as a field-scale pilot.

Lee Brecher; Charles Mones; Frank Guffey

2009-03-07T23:59:59.000Z

418

Full SPP Partnership Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

419

Technical Safety Requirements  

Broader source: Energy.gov (indexed) [DOE]

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

420

Promulgating Nuclear Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

1996-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Requirements for security signalling  

SciTech Connect (OSTI)

There has been some interest lately in the need for ``authenticated signalling``, and the development of signalling specifications by the ATM Forum that support this need. The purpose of this contribution is to show that if authenticated signalling is required, then supporting signalling facilities for directory services (i.e. key management) are also required. Furthermore, this contribution identifies other security related mechanisms that may also benefit from ATM-level signalling accommodations. For each of these mechanisms outlined here, an overview of the signalling issues and a rough cut at the required fields for supporting Information Elements are provided. Finally, since each of these security mechanisms are specified by a number of different standards, issues pertaining to the selection of a particular security mechanism at connection setup time (i.e. specification of a required ``Security Quality of Service``) are also discussed.

Pierson, L.G.; Tarman, T.D.

1995-02-05T23:59:59.000Z

422

Timeline for Net Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

17.5 7302010 Yes Biennially x By July 31 of each Forecast Year, BPA publishes all Load Following customers' Net Requirements data for the two years of the upcoming Rate...

423

Transportation Infrastructure Requirement Resources  

Broader source: Energy.gov [DOE]

Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum...

424

BES Science Network Requirements  

E-Print Network [OSTI]

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

425

Goals and Requirements  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) is committed to meeting the goals of Executive Order (E.O.) 13514, E.O. 13423, and related statutory requirements through the Strategic Sustainability Performance Plan (SSPP).

426

System Verification Through Reliability, Availability, Maintainability (RAM) Analysis & Technology Readiness Levels (TRLs)  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is authored by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype fourth generation nuclear reactor to meet the needs of the 21st Century. A section in this document proposes that the NGNP will provide heat for process heat applications. As with all large projects developing and deploying new technologies, the NGNP is expected to meet high performance and availability targets relative to current state of the art systems and technology. One requirement for the NGNP is to provide heat for the generation of hydrogen for large scale productions and this process heat application is required to be at least 90% or more available relative to other technologies currently on the market. To reach this goal, a RAM Roadmap was developed highlighting the actions to be taken to ensure that various milestones in system development and maturation concurrently meet required availability requirements. Integral to the RAM Roadmap was the use of a RAM analytical/simulation tool which was used to estimate the availability of the system when deployed based on current design configuration and the maturation level of the system.

Emmanuel Ohene Opare, Jr.; Charles V. Park

2011-06-01T23:59:59.000Z

427

How to complete an Annual Review of your UC Ready Continuity Plan The campus recommends that departmental continuity plans be reviewed and updated annually.  

E-Print Network [OSTI]

How to complete an Annual Review of your UC Ready Continuity Plan The campus recommends that departmental continuity plans be reviewed and updated annually. The annual review process is straightforward plan is up-to-date, click this tab and mark your annual review complete by entering the requested

Walker, Matthew P.

428

The role of metacognitive listening strategies awareness and podcast-use readiness in using podcasting for learning English as a foreign language  

Science Journals Connector (OSTI)

The aim of this study was to investigate the role of English as Foreign Language (EFL) learners metacognitive listening strategies awareness and podcast-use readiness in using podcasting technology for learning English as a foreign language. One hundred and forty-one EFL students completed Metacognitive Awareness Listening Questionnaire (MALQ) that assessed their awareness and perceived use of listening strategies in five components including planning-evaluation, directed attention, person knowledge, mental translation, and problem solving. They also completed a questionnaire that assessed their readiness to use podcasting in terms of familiarity, attitude, and experience. Information on participants frequency of podcast use for learning English, frequency of the internet use, and digital device ownership was also obtained. The result of the analysis revealed that podcasting use was significantly related to metacognitive listening strategies awareness in general and its entire components except mental translation strategies while the strongest correlation was found with problem solving strategies (r=.49, p<0.01). Podcasting use was also found to be significantly related to perceived podcast-use readiness and internet use hours. Further, multiple regressions showed that perceived podcast-use readiness, problem solving, and person knowledge -in order of power prediction- were good predictors of podcasting use for learning English as a foreign language.

Mehrak Rahimi; Maral Katal

2012-01-01T23:59:59.000Z

429

TESTING SITE APPROVAL AND PROCTOR AGREEMENT FORM Congratulations on being ready to take an exam.You must have your testing site approved by University Extension  

E-Print Network [OSTI]

TESTING SITE APPROVAL AND PROCTOR AGREEMENT FORM Congratulations on being ready to take an exam.You must have your testing site approved by University Extension (UEX) each time you request an exam if it is not a pre-approved site with us. See our website for more information about testing policies or the exam

430

Are you ready to QUIT smoking or using other tobacco products? Help is now available on campus through Quit Smoking NOW (QSN). This FREE six-week tobacco  

E-Print Network [OSTI]

Are you ready to QUIT smoking or using other tobacco products? Help is now available on campus tobacco-free. With the help of a trained smoking cessation facilitator, you can learn how to: Combat cravings, identify triggers, manage your moods and develop strategies that will help you quit for good

Weston, Ken

431

In 2006, the Alliance of Coastal Technology (ACT) evaluated the performance of five commercial-ready, in situ turbidity sensors at  

E-Print Network [OSTI]

commercial-ready, in situ turbidity sensors at eight test sites located throughout North America (Fig. 1, and a freshwater lake (Fig. 1) . The sensors used in this study consisted of: A backscatter Turbidity Probe ( =660 A transmissometer ( =660nm) ­ data denoted by cp Both scattering sensors were equipped with integrated copper wipers

Boss, Emmanuel S.

432

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

433

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

Broader source: Energy.gov (indexed) [DOE]

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

434

VFP: Program Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

435

BER Science Network Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

436

SULI: Program Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

437

Federal Metering Requirements  

Broader source: Energy.gov (indexed) [DOE]

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

438

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

439

Federal Metering Requirements  

Broader source: Energy.gov [DOE]

Presentationgiven at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meetingcovers the 42 USC 8253 Energy Management Requirement; Executive Order 13514(g) High-Performance Sustainable Federal Buildings; federal metering needs, history, and status; and utility/agency opportunities.

440

Minor in Philosophy Requirements  

E-Print Network [OSTI]

2012-05-23 Minor in Philosophy Requirements: 1. 18 hours of work in philosophy with grades of C- or better. 2. A 2.0 grade point average for all work attempted in philosophy. 3. 9 hours of upper division work in philosophy, with grades of C- or better. 4. Completion of at least one course, with a grade

Stowell, Michael

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Requirements Definition Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

1997-05-21T23:59:59.000Z

442

Documents Notes Requirements  

E-Print Network [OSTI]

Documents Notes Common Requirements Application Form(typed) with 3 photos attached(3.5 x 4.5cm(including National Intelligence & Security Track), International Trade, International Finance, Korea and East Asia for Application : November 13(Tue), 2012 · Announcement of Documents Screening Results : 2 pm on November 21(Wed

Jang, Ju-Wook

443

Heat Requirements of Buildings  

Science Journals Connector (OSTI)

... and Ventilating Engineers in a publication entitled Recommendations for the Computation of Heat Requirements for Buildings (Pp. iii+41. Is. 9d.) This comprises a section of the ... parts. That on temperature-rise and rates of change gives the recommended values applicable to buildings ranging alphabetically from aircraft sheds to warehouses. The design of heating and ventilating installations ...

1942-02-28T23:59:59.000Z

444

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility  

SciTech Connect (OSTI)

This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

Stephen Schey; Jim Francfort

2014-10-01T23:59:59.000Z

445

NERSC Requirements Workshop November  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

446

LEGACY MANAGEMENT REQUIRES INFORMATION  

SciTech Connect (OSTI)

''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

CONNELL, C.W.; HILDEBRAND, R.D.

2006-12-14T23:59:59.000Z

447

BER Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

448

Part B - Requirements & Funding Information PART B - Requirements...  

Office of Environmental Management (EM)

b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency...

449

Hot dry rock geothermal energy -- a renewable energy resource that is ready for development now  

SciTech Connect (OSTI)

Hot dry rock (HDR) geothermal energy, which utilizes the natural heat contained in the earth's crust, is a very large and well-distributed resource of nonpolluting, and essentially renewable, energy that is available globally. Its use could help mitigate climatic change and reduce acid rain, two of the major environmental consequences of our ever-increasing use of fossil fuels for heating and power generation. In addition, HDR, as a readily available source of indigenous energy, can reduce our nations's dependence on imported oil, enhancing national security and reducing our trade deficit. The earth's heat represents an almost unlimited source of energy that can begin to be exploited within the next decade through the HDR heat-mining concept being actively developed in the United States, Great Britain, Japan, and several other countries. On a national scale we can begin to develop this new source, using it directly for power generation or for direct-heat applications, or indirectly in hybrid geothermal/fossil-fuel power plants. In the HDR concept, which has been demonstrated in the field in two different applications and flow- tested for periods up to one year, heat is recovered from the earth by pressurized water in a closed-loop circulation system. As a consequence, minimal effluents are released to the atmosphere, and no wastes are produced. This paper describes the nature of the HDR resource and the technology required to implement the heat-mining concept. An assessment of the requirements for establishing HDR feasibility is presented in the context of providing a commercially competitive energy source.

Brown, D.W.; Potter, R.M.; Myers, C.W.

1990-01-01T23:59:59.000Z

450

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. General Electric Energy and Environmental Research Corporation (GE-EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE-EER was awarded a Vision-21 program from U.S. DOE NETL to develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE-EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work in the first quarter of this program, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R and D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the 1st quarterly progress report for the Vision-21 AGC program supported by U.S. DOE NETL (Contract: DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2000 and ending December 31, 2000. The report includes an introduction summarizing the AGC concept, main program tasks, objectives of this program, and provides a summary of initial program activities covering program management and preliminary progress in first year tasks including lab- and bench-scale design, facilities preparation, and process/kinetic modeling. More over, the report presents and discusses preliminary results particularly form the bench-scale design and process modeling efforts including a process flow diagram that incorporates the AGC module with other vision-21 plant components with the objective of maximizing H{sub 2} production and process efficiency.

George Rizeq; Ravi Kumar; Janice West; Vitali Lissianski; Neil Widmer; Vladimir Zamansky

2001-01-01T23:59:59.000Z

451

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GE EER (prime contractor) was awarded a Vision 21 program from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GE EER, Southern Illinois University at Carbondale (SIU-C), California Energy Commission (CEC), and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on process modeling work, has an estimated process efficiency of 68%, based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal, and an estimated equivalent electrical efficiency of 60%. The Phase I R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the UFP technology. This is the tenth quarterly technical progress report for the Vision 21 UFP program supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting January 1, 2003 and ending March 31, 2003. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab-scale experimental testing, pilot-scale assembly, and program management.

George Rizeq; Janice West; Arnaldo Frydman; Raul Subia; Vladimir Zamansky; Hana Loreth; Lubor Stonawski; Tomasz Wiltowski; Edwin Hippo; Shashi Lalvani

2003-04-01T23:59:59.000Z

452

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GE EER was awarded a Vision 21 program from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GE EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on process modeling work, has an estimated process efficiency of 68%, based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal, and an estimated equivalent electrical efficiency of 60%. The Phase I R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the UFP technology. This is the ninth quarterly technical progress report for the Vision 21 UFP program supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2002 and ending December 31, 2002. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab- and bench-scale experimental testing, pilot-scale design and assembly, and program management.

George Rizeq; Janice West; Arnaldo Frydman; Raul Subia; Vladimir Zamansky; Hana Loreth; Lubor Stonawski; Tomasz Wiltowski; Edwin Hippo; Shashi Lalvani

2003-01-01T23:59:59.000Z

453

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. GE Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE EER was awarded a Vision 21 program from U.S. DOE NETL to develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the second annual technical progress report for the Vision 21 AGC program supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2001 and ending September 30, 2002. The report includes an introduction summarizing the AGC concept, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab- and bench-scale experimental testing, pilot-scale design and assembly, and program management.

George Rizeq; Janice West; Arnaldo Frydman; Raul Subia; Vladimir Zamansky; Hana Loreth; Lubor Stonawski; Tomasz Wiltowski; Edwin Hippo; Shashi Lalvani

2002-10-01T23:59:59.000Z

454

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Global Research (GEGR) has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GEGR (prime contractor) was awarded a Vision 21 program from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GEGR, Southern Illinois University at Carbondale (SIU-C), California Energy Commission (CEC), and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on process modeling with best-case scenario assumptions, has an estimated process efficiency of 68%, based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal, and an estimated equivalent electrical efficiency of 60%. The Phase I R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the UFP technology. This is the eleventh quarterly technical progress report for the Vision 21 UFP program supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting April 1, 2003 and ending June 30, 2003. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab-scale experimental testing, pilot-scale assembly, and program management.

George Rizeq; Janice West; Arnaldo Frydman; Raul Subia; Vladimir Zamansky; Hana Loreth; Lubor Stonawski; Tomasz Wiltowski; Edwin Hippo; Shashi Lalvani

2003-07-01T23:59:59.000Z

455

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. General Electric Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE EER was awarded a Vision-21 program from U.S. DOE NETL to develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work in the first quarter of this program, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the fifth quarterly technical progress report for the Vision-21 AGC program supported by U.S. DOE NETL (Contract: DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2001 and ending December 31, 2001. The report includes an introduction summarizing the AGC concept, main program tasks, and program objectives; it also provides a summary of program activities covering program management and progress in tasks including lab- and bench-scale experimental testing, pilot-scale design, and economic studies.

George Rizeq; Janice West; Arnaldo Frydman; Raul Subia; Vladimir Zamansky; Tomasz Wiltowski; Tom Miles; Bruce Springsteen

2002-01-01T23:59:59.000Z

456

Utility Advanced Turbine Systems Program (ATS) Technical Readiness Testing and Pre-Commercial Demonstration  

SciTech Connect (OSTI)

The objective of the ATS program is to develop ultra-high efficiency, environmentally superior and cost competitive gas turbine systems for base load application in utility, independent power producer and industrial markets. Specific performance targets have been set using natural gas as the primary fuel: {lg_bullet} System efficiency that will exceed 60%(lower heating value basis) on natural gas for large scale utility turbine systems; for industrial applications, systems that will result in a 15% improvement in heat rate compared to currently available gas turbine systems. {lg_bullet} An environmentally superior system that will not require the use of post combustion emissions controls under full load operating conditions. {lg_bullet} Busbar energy costs that are 10% less than current state-of-the-art turbine systems, while meeting the same environmental requirements. {lg_bullet} Fuel-flexible designs that will operate on natural gas but are capable of being adapted to operate on coal-derived or biomass fuels. {lg_bullet} Reliability-Availability-Maintainability (RAM) that is equivalent to the current turbine systems. {lg_bullet} Water consumption minimized to levels consistent with cost and efficiency goals. {lg_bullet} Commercial systems that will enter the market in the year 2000. In Phase I of the ATS program, Siemens Westinghouse found that efficiency significantly increases when the traditional combined-cycle power plant is reconfigured with closed-loop steam cooling of the hot gas path. Phase II activities involved the development of a 318MW natural gas fired turbine conceptual design with the flexibility to burn coal-derived and biomass fuels. Phases I and II of the ATS program have been completed. Phase III, the current phase, completes the research and development activities and develops hardware specifications from the Phase II conceptual design. This report summarizes Phase III Extension activities for a three-month period. Additional details may be found in monthly technical progress reports covering the period stated on the cover of this report. Background information regarding the work to be completed in Phase III may be found in the revised proposal submitted in response to A Request for Extension of DE-FC21-95MC32267, dated May 29, 1998 and the Continuing Applications of DE-FC21-95MC32267, dated March 31, 1999 and November 19, 1999.

Siemens Westinghouse

2001-06-30T23:59:59.000Z

457

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING: PHASE 3R  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown. This report summarizes work accomplished in 2Q99.

None

1999-09-01T23:59:59.000Z

458

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group  

E-Print Network [OSTI]

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 0880BSE Sub-Plan: RG 6856 BIOMEDICAL ENGINEERING MAJOR REQUIREMENTS Effective FA05/1560 (09/06/2005) RQ 4996 Program Subjects Effective FA05/1560 (09/06/2005) LN 0010 BIOMEDE

Shyy, Wei

459

Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, June 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pantex Site Office's Compliance with Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1 1.0 Purpose .................................................................................................................................................. 1 2.0 Introduction ........................................................................................................................................... 1 3.0 Assessment Methodologies and Approach ........................................................................................... 1

460

Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, June 2012  

Broader source: Energy.gov (indexed) [DOE]

Pantex Site Office's Compliance with Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1 1.0 Purpose .................................................................................................................................................. 1 2.0 Introduction ........................................................................................................................................... 1 3.0 Assessment Methodologies and Approach ........................................................................................... 1

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Development of high-temperature turbine subsystem technology to a technology readiness status, Phase II. Quarterly report, January-March 1981  

SciTech Connect (OSTI)

progress in developing a technical readiness vehicle (TRV) for demonstrating the performance of a combined-cycle power plant with high-temperature, 2600 to 3000/sup 0/F firing temperature, gas turbines using coal-derived gas fuel is reported. Work on the combined-cycle power plant and TRV design, component development, aerodynamics studies, simulation, and fuel gas cleanup systems is described. (LCL)

Horner, M.W.

1981-04-01T23:59:59.000Z

462

Heat Integration of the Water-Gas Shift Reaction System for Carbon Sequestration Ready IGCC Process with Chemical Looping  

SciTech Connect (OSTI)

Integrated gasification combined cycle (IGCC) technology has been considered as an important alternative for efficient power systems that can reduce fuel consumption and CO2 emissions. One of the technological schemes combines water-gas shift reaction and chemical-looping combustion as post gasification techniques in order to produce sequestration-ready CO2 and potentially reduce the size of the gas turbine. However, these schemes have not been energetically integrated and process synthesis techniques can be applied to obtain an optimal flowsheet. This work studies the heat exchange network synthesis (HENS) for the water-gas shift reaction train employing a set of alternative designs provided by Aspen energy analyzer (AEA) and combined in a process superstructure that was simulated in Aspen Plus (AP). This approach allows a rigorous evaluation of the alternative designs and their combinations avoiding all the AEA simplifications (linearized models of heat exchangers). A CAPE-OPEN compliant capability which makes use of a MINLP algorithm for sequential modular simulators was employed to obtain a heat exchange network that provided a cost of energy that was 27% lower than the base case. Highly influential parameters for the pos gasification technologies (i.e. CO/steam ratio, gasifier temperature and pressure) were calculated to obtain the minimum cost of energy while chemical looping parameters (oxidation and reduction temperature) were ensured to be satisfied.

Juan M. Salazara; Stephen E. Zitney; Urmila M. Diwekara

2010-01-01T23:59:59.000Z

463

Report of the oversight assessment of the operational readiness review of the Rocky Flats Plant, Building 707  

SciTech Connect (OSTI)

This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy`s (DOE) office of Environment, Safety and Health (EH) of the Operational Readiness Review (ORR) activities for the resumption of Building 707 operations at the Rocky Flats Plant (RFP). The EH OA was simultaneously conducted with the Office of Defense Programs (DP) line management ORR, which was conducted from September 21 to October 2, 1992, and November 2 to 13, 1992. The EH OA evaluated the comprehensiveness and effectiveness of the DP ORR. Based on its oversight assessment, the EH OA believes that Building 707 operations may be safely resumed contingent upon satisfactory resolution of all DP ORR findings. The EH OA determined that the DP ORR was conducted in a comprehensive and effective manner and represents an adequate basis for recommending resumption of Building 707 operations. The EH OA was based primarily on an evaluation of the comprehensiveness and effectiveness of the DP ORR and addressed the following areas: Management and Organization, Industrial Safety, Fire Protection, Industrial Hygiene, Conduct of Operations, Maintenance, Quality Assurance, and Training. In a limited number of these areas, the EH OA conducted independent vertical-slice reviews DP ORR results.

Krupar, J.J. Jr.

1992-12-18T23:59:59.000Z

464

Report of the oversight assessment of the operational readiness review of the Rocky Flats Plant, Building 707  

SciTech Connect (OSTI)

This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy's (DOE) office of Environment, Safety and Health (EH) of the Operational Readiness Review (ORR) activities for the resumption of Building 707 operations at the Rocky Flats Plant (RFP). The EH OA was simultaneously conducted with the Office of Defense Programs (DP) line management ORR, which was conducted from September 21 to October 2, 1992, and November 2 to 13, 1992. The EH OA evaluated the comprehensiveness and effectiveness of the DP ORR. Based on its oversight assessment, the EH OA believes that Building 707 operations may be safely resumed contingent upon satisfactory resolution of all DP ORR findings. The EH OA determined that the DP ORR was conducted in a comprehensive and effective manner and represents an adequate basis for recommending resumption of Building 707 operations. The EH OA was based primarily on an evaluation of the comprehensiveness and effectiveness of the DP ORR and addressed the following areas: Management and Organization, Industrial Safety, Fire Protection, Industrial Hygiene, Conduct of Operations, Maintenance, Quality Assurance, and Training. In a limited number of these areas, the EH OA conducted independent vertical-slice reviews DP ORR results.

Krupar, J.J. Jr.

1992-12-18T23:59:59.000Z

465

Fuel-Flexible Gasification-Combustion Technology for Production of H2 and Sequestration-Ready CO2  

SciTech Connect (OSTI)

GE Global Research is developing an innovative energy technology for coal gasification with high efficiency and near-zero pollution. This Unmixed Fuel Processor (UFP) technology simultaneously converts coal, steam and air into three separate streams of hydrogen-rich gas, sequestration-ready CO{sub 2}, and high-temperature, high-pressure vitiated air to produce electricity in gas turbines. This is the draft final report for the first stage of the DOE-funded Vision 21 program. The UFP technology development program encompassed lab-, bench- and pilot-scale studies to demonstrate the UFP concept. Modeling and economic assessments were also key parts of this program. The chemical and mechanical feasibility were established via lab and bench-scale testing, and a pilot plant was designed, constructed and operated, demonstrating the major UFP features. Experimental and preliminary modeling results showed that 80% H{sub 2} purity could be achieved, and that a UFP-based energy plant is projected to meet DOE efficiency targets. Future work will include additional pilot plant testing to optimize performance and reduce environmental, operability and combined cycle integration risks. Results obtained to date have confirmed that this technology has the potential to economically meet future efficiency and environmental performance goals.

George Rizeq; Janice West; Raul Subia; Arnaldo Frydman; Parag Kulkarni; Jennifer Schwerman; Valadimir Zamansky; John Reinker; Kanchan Mondal; Lubor Stonawski; Hana Loreth; Krzysztof Piotrowski; Tomasz Szymanski; Tomasz Wiltowski; Edwin Hippo

2005-02-28T23:59:59.000Z

466

2010 Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power and Materials Handling Equipment Markets  

SciTech Connect (OSTI)

In 2008, the National Renewable Energy Laboratory (NREL), under contract to the US Department of Energy (DOE), conducted a manufacturing readiness assessment (MRA) of fuel cell systems and fuel cell stacks for back-up power and material handling applications (MHE). To facilitate the MRA, manufacturing readiness levels (MRL) were defined that were based on the Technology Readiness Levels previously established by the US Department of Energy (DOE). NREL assessed the extensive existing hierarchy of MRLs developed by Department of Defense (DoD) and other Federal entities, and developed a MRL scale adapted to the needs of the Fuel Cell Technologies Program (FCTP) and to the status of the fuel cell industry. The MRL ranking of a fuel cell manufacturing facility increases as the manufacturing capability transitions from laboratory prototype development through Low Rate Initial Production to Full Rate Production. DOE can use MRLs to address the economic and institutional risks associated with a ramp-up in polymer electrolyte membrane (PEM) fuel cell production. In 2010, NREL updated this assessment, including additional manufacturers, an assessment of market developments since the original report, and a comparison of MRLs between 2008 and 2010.

Wheeler, D.; Ulsh, M.

2012-08-01T23:59:59.000Z

467

[2.02] Confocal endomicroscopy (CFE) in gastroenterology: Ready for prime time?  

Science Journals Connector (OSTI)

Objective Confocal laser endomicroscopy (CFE), when implemented during endoscopy, enables in vivo microscopy of the mucosal layer of any tissue in the gastrointestinal tract with subcellular resolution. Endomicroscopy opens the door to immediate tissue and vessel analysis. Different types of diseases can be diagnosed with optical surface and subsurface analysis. Discrimination between normal and malignant cells is possible. Analysis of the in vivo microarchitecture can be used for targeting biopsies to relevant areas, and subsurface imaging can unmask microscopic diseases. The aim of our study was to validate this new technique further. Material and methods For CFE we used a Cellvizio miniprobe, which is compatible for all endoscopes with an operating channel of 2.6mm. Placed in contact with the mucosa, the miniprobe delivers real-time video sequences of the tissue microarchitecture at 12 images per second and a depth resolution of about 50?m. We used CFE to perform optical biopsies in patients with known Barrett's esophagus, one with a known high-grade intraepithelial neoplasia, in the follow-up of a patient after small bowel transplantation, and in a patient with invasive cholangiocellular carcinoma of the bile duct. Additionally, we performed CFE in a newly established pig model of benign bile duct stenosis. The benign stenosis were induced by endoscopic retrograde cholangiography (ERC) with introduction of a 10 Fr-heater probe and application of HF energy (400J) approximately 3cm proximal of the papillae. Results Confocal imaging of the normal squamous epithelium of the esophagus demonstrated squamous cells at high resolution, showing capillaries (filled with red blood cells) within single papillae. The typical shape of Barrett's epithelium was villous, differing from the cardiac epithelium. High-grade intraepithelial neoplasias can be recognized by a distinct cell type in endomicroscopy. Nevertheless, this technique appears to require experience and is not an easy-to-use-method in the esophagus. In contrast, CFE appears to be safe and useful for monitoring patients for transplant rejection after small bowel transplantation. In bile duct cancer, CFE showed a deranged vascular architecture in contrast to the regular pattern obtained within the normal epithelium of this patient. In our pig model we were able to establish a reproducible benign bile duct stenosis. These fibrotic structures were characterized by virtually no CFE signal. This is in direct contrast to the normal bile duct epithelium of animals and to the bile duct cancer mentioned above. Conclusion CFE is feasible in a wide variety of gastrointestinal tissues using regular endoscopes and a thin miniprobe. Although real-time optical biopsies are achievable, the exact diagnosis still has to be made by the pathologist. CFE is helpful for discrimination between normal tissue and dysplasia or even carcinoma. The application in the bile duct system probably requires an additional cholangioscope for placing the miniprobe specifically in the suspected area. Further studies are necessary to evaluate this promising technique in bile-duct disorders in humans.

Claus Schfer; Walter Assmann; Ronald Sroka; Christian Graeb; Michael Thormann; Andreas Wagner; Burkhard Gke; Jrg Schirra

2009-01-01T23:59:59.000Z

468

Quantified maintainability requirements  

E-Print Network [OSTI]

c'. 1UIE f. r failures. A ti: ~ for reoair is a'Iso . . :-. . rat. ' Us i!!g a ran::", m number generator a;!d tne duns i tv fuiiction for repa Tile;Eiato raLa Of aVailai'ilitleS ES ii. "U olott"d ~'vine th. o nsit, : f'one+ion fnr C, ol avai Iaui...QU/'ZITI F IF!3 !r A I!'! TA I I'!AD I L I TY;E OUI PE"! EI! TS A Thesis by Ponald Scott Vorri s Submitted to th= Fraduate ColleOo of th Texas AA!! UniyersitJ in partial fulfillment of the requirements for the de, ro of' !1ASTEP. OF SCIE...

Morris, Ronald Scott

2012-06-07T23:59:59.000Z

469

Repository seals requirement study  

SciTech Connect (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

470

Economic Incentives for Cybersecurity: Using Economics to Design Technologies Ready for Deployment  

SciTech Connect (OSTI)

Cybersecurity practice lags behind cyber technology achievements. Solutions designed to address many problems may and do exist but frequently cannot be broadly deployed due to economic constraints. Whereas security economics focuses on the cost/benefit analysis and supply/demand, we believe that more sophisticated theoretical approaches, such as economic modeling, rarely utilized, would derive greater societal benefits. Unfortunately, today technologists pursuing interesting and elegant solutions have little knowledge of the feasibility for broad deployment of their results and cannot anticipate the influences of other technologies, existing infrastructure, and technology evolution, nor bring the solutions lifecycle into the equation. Additionally, potentially viable solutions are not adopted because the risk perceptions by potential providers and users far outweighs the economic incentives to support introduction/adoption of new best practices and technologies that are not well enough defined. In some cases, there is no alignment with redominant and future business models as well as regulatory and policy requirements. This paper provides an overview of the economics of security, reviewing work that helped to define economic models for the Internet economy from the 1990s. We bring forward examples of potential use of theoretical economics in defining metrics for emerging technology areas, positioning infrastructure investment, and building real-time response capability as part of software development. These diverse examples help us understand the gaps in current research. Filling these gaps will be instrumental for defining viable economic incentives, economic policies, regulations as well as early-stage technology development approaches, that can speed up commercialization and deployment of new technologies in cybersecurity.

Vishik, Claire [Intel Corporation] [Intel Corporation; Sheldon, Frederick T [ORNL] [ORNL; Ott, David [Intel Corporation] [Intel Corporation

2013-01-01T23:59:59.000Z

471

Equipment Operational Requirements  

SciTech Connect (OSTI)

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

472

Software and House Requirements Engineering  

E-Print Network [OSTI]

a requirements engineer who puts her knowledge of software construction together with her creativity to come upSoftware and House Requirements Engineering: Lessons Learned in Combatting Requirements Creep creativity to try to come up with a plan for a house that will meet the customer's requirements. The customer

Berry, Daniel M.

473

Match Pumps to System Requirements  

SciTech Connect (OSTI)

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

Not Available

2005-10-01T23:59:59.000Z

474

Requirements-driven software evolution  

Science Journals Connector (OSTI)

It is often the case that stakeholders want to strengthen/weaken or otherwise change their requirements for a system-to-be when certain conditions apply at runtime. For example, stakeholders may decide that if requirement R is violated more ... Keywords: Adaptive systems, Evolution, Modeling, Requirements, Requirements engineering

Vtor E. Souza; Alexei Lapouchnian; Konstantinos Angelopoulos; John Mylopoulos

2013-11-01T23:59:59.000Z

475

National Geothermal Data System (NGDS) Geothermal Data: Community Requirements and Information Engineering  

SciTech Connect (OSTI)

To satisfy the critical need for geothermal data to advance geothermal energy as a viable renewable energy contender, the U.S. Department of Energy is investing in the development of the National Geothermal Data System (NGDS). This paper outlines efforts among geothermal data providers nationwide to supply cutting edge geo-informatics. NGDS geothermal data acquisition, delivery, and methodology are discussed. In particular, this paper addresses the various types of data required to effectively assess geothermal energy potential and why simple links to existing data are insufficient. To create a platform for ready access by all geothermal stakeholders, the NGDS includes a work plan that addresses data assets and resources of interest to users, a survey of data providers, data content models, and how data will be exchanged and promoted, as well as lessons learned within the geothermal community.

Anderson, Arlene [United States Department of Energy; Blackwell, David [Southern Methodist University; Chickering, Cathy [Southern Methodist University; Boyd, Toni [Oregon Institute of Technology; Horne, Roland [Stanford University; MacKenzie, Matthew [Uberity Technology Corporation; Moore, Joseph [University of Utah; Nickull, Duane [Uberity Technology Corporation; Richard, Stephen [Arizona Geological survey; Shevenell, Lisa A. [University of Nevada, Reno

2013-10-01T23:59:59.000Z

476

SG Network System Requirements Specification  

Broader source: Energy.gov (indexed) [DOE]

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

477

4.5 Audit Requirements  

Broader source: Energy.gov (indexed) [DOE]

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

478

Energy requirements for nuclear transformations  

Science Journals Connector (OSTI)

Energy requirements for nuclear transformations ... There are several conservation requirements that must be met in nuclear reactions, including the conservation of energy (E = mc2), charge, angular and linear momentum. ... Nuclear / Radiochemistry ...

Benjamin Carrol; Peter F. E. Marapodi

1951-01-01T23:59:59.000Z

479

Webinar: Hydrogen Storage Materials Requirements  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Hydrogen Storage Materials Requirements, originally presented on June 25, 2013.

480

Ready, set...go!  

E-Print Network [OSTI]

any proof participatory ergonomics works? What does thefor changes in an ergonomics program or intervention of change Changes in ergonomics program or intervention

Alexandre, Melanie

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ghana-redd readiness requires" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Readiness Review RM  

Broader source: Energy.gov [DOE]

This module assists DOE Federal line management in their efforts to bring a project or facility into a condition where it is sufficiently prepared to start or resume operations prior to CD-4...

482

Construction Readiness RM  

Broader source: Energy.gov [DOE]

The authorization to proceed with construction of a new facility is given at the CD-3 phase of the project management cycle, after completion of the final design. Between CD-3 and CD-4 stages of...

483

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule  

SciTech Connect (OSTI)

This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

Soli T. Khericha

2006-09-01T23:59:59.000Z

484

ANSI Essential Requirements: Due process requirements for American  

E-Print Network [OSTI]

ANSI Essential Requirements: Due process requirements for American National Standards Edition: January 2010 Copyright by the American National Standards Institute (ANSI), 25 West 43rd Street, 4th Floor, New York, New York 10036. This material may be copied without permission from ANSI only

485

Fusion Energy Sciences Network Requirements  

E-Print Network [OSTI]

Division, and the Office of Fusion Energy Sciences. This isFusion Energy Sciences NetworkRequirements Office of Fusion Energy Sciences Energy

Dart, Eli

2014-01-01T23:59:59.000Z

486

Vice President, Northwest Requirements Marketing  

Broader source: Energy.gov [DOE]

The Northwest Requirements Marketing organization develops power rates, products, services, and contracts, administers long-term power contracts and other related contracts, manages third-party...

487

Degree Requirements COLLEGE OF ENGINEERING  

E-Print Network [OSTI]

or better is required in ECON 2000 (Engineering Economics), Philosophy 2244 (Engineering Ethics), and ENGLDegree Requirements COLLEGE OF ENGINEERING B.S. in Electrical Engineering Effective Date: 08) 6 Total 30 MUST SELECT ONE Computer Engineering Concentration Course Name/ # Credit Hours Course

Kulp, Mark

488

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry/Biotechnology Graduate Program. A detailed account of the academic requirements and procedures is provided for graduate students in chemistry; to promote consistency in procedures and standards; and to provide a basis for communication between

Kounaves, Samuel P.

489

Humidity requirements in WSCF Laboratories  

SciTech Connect (OSTI)

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

490

Describing the readiness for retention of students of color at state and land-grant colleges of agriculture  

E-Print Network [OSTI]

are needed to produce changes in services and programs required by these students. Despite the modest gains in enrollment, students of color remain underrepresented at every degree level in higher education. Despite volumes of research, institutions still...

Harris, Danielle Alexander

2007-04-25T23:59:59.000Z

491

Part B - Requirements & Funding Information PART B - Requirements...  

Energy Savers [EERE]

to support the determinations and findings (D&F) required by FAR 17.502-2 to the contracting officer. Provide this information as an attachment or coordinate with the...

492

Home: Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

493

Cyber Security Issues and Requirements  

Broader source: Energy.gov (indexed) [DOE]

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

494

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

495

Psychology Department Mandatory Advising Requirement  

E-Print Network [OSTI]

10/2011 Psychology Department Mandatory Advising Requirement Instructions 1) Student completes Part advisor's signature. 4) Once the form is signed, submit form to Psychology Department, EP 301 to clear

496

Meeting Federal Energy Security Requirements  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

497

Materials Requirements for Offshore Structures  

Science Journals Connector (OSTI)

...effect temporary simple repairs underwater but the...for the submarine repair of offshore platforms...possibility exists that pipelines at this depth may require local repair. For such simple...connection of bolts for patch repairs etc. and...

1976-01-01T23:59:59.000Z

498

Readiness Assessment for MF-628 Drum Treatment Facility - Advanced Mixed Waste Treatment Project … 5-07  

Broader source: Energy.gov (indexed) [DOE]

CRITICALITY SAFETY CRITICALITY SAFETY OBJECTIVE CS.1 Facility safety documentation that describes the "safety envelope" for the AR Project II activities is in place and has been implemented and administrative and engineering controls to prevent and mitigate hazards associated with commencing the AR Project II activities are tailored to the work being performed and the associated hazards to meet the following criteria: CRITERIA: CS. 1.1 Criticality safety requirements are current, approved, and properly controlled. CS. 1.2 Facility safety and criticality requirements have been incorporated into applicable procedures and documents. REVIEW APPROACH: Document Reviews: * Review applicable CSEs for identification of facility hazards and development

499

Quality Assurance Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Requirements Quality Assurance Requirements The QARD provides the framework for both the achievement and verification of quality. Quality Assurance Requirements and Description...

500

Laws and Requirements | Department of Energy  

Office of Environmental Management (EM)

Laws and Requirements Laws and Requirements To help agencies comply with federal laws and requirements, the Federal Energy Management Program (FEMP) analyzes energy management...