Powered by Deep Web Technologies
Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EIS-0435: Modification of the Groton Generation Station Interconnection  

Broader source: Energy.gov (indexed) [DOE]

5: Modification of the Groton Generation Station 5: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Summary This EIS evaluates the environmental impacts of a proposal for DOE's Western Area Power Administration to modify its Large Generator Connection Agreement for the Groton Generation Station in Brown County, South Dakota. The modification would allow Basin Electric Power Cooperative, which operates the generation station, to produce power above the current operating limit of 50 average megawatts. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download June 3, 2011 EIS-0435: Final Environmental Impact Statement

2

Interconnection Agreements for Onsite Generation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Agreements Interconnection Agreements for Onsite Generation Office of Real Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception

3

Generation Interconnection and Deliverability Allocation Procedures...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Generation Interconnection and Deliverability Allocation ProceduresLegal Abstract Generation...

4

Renewable Generation and Interconnection to the Electrical Grid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Renewable Generation and Interconnection to the Electrical Grid in Southern California Renewable Generation and Interconnection to the Electrical Grid in Southern California...

5

Interconnection Standards for Small Generators | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards for Small Generators Interconnection Standards for Small Generators Interconnection Standards for Small Generators < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities

6

Dubuque generation station, Dubuque, Iowa  

SciTech Connect (OSTI)

Alliant Energy's Dubuque generation station is a fine example of why small does not mean insignificant in the power generation industry. This winner of the EUCG best performer award in the small plant category shows that its operating excellence towers over that of many larger and much newer coal-fired power plants. The plant has three operating units with boilers originally designed for Illinois basin coal but now Powder River Basin coal makes up 75% of the coal consumed. The boilers can also burn natural gas. 4 photos.

Peltier, R.

2008-10-15T23:59:59.000Z

7

Illinois Nuclear Profile - Braidwood Generation Station  

U.S. Energy Information Administration (EIA) Indexed Site

Braidwood Generation Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

8

Illinois Nuclear Profile - Byron Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Byron Generating Station" ,"Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

9

GRR/Section 8-TX-c - Distributed Generation Interconnection | Open Energy  

Open Energy Info (EERE)

GRR/Section 8-TX-c - Distributed Generation Interconnection GRR/Section 8-TX-c - Distributed Generation Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-c - Distributed Generation Interconnection 8-TX-c - Distributed Generation Interconnection.pdf Click to View Fullscreen Contact Agencies Public Utility Commission of Texas Regulations & Policies PUCT Substantive Rule 25.211 PUCT Substantive Rule 25.212 Triggers None specified Click "Edit With Form" above to add content 8-TX-c - Distributed Generation Interconnection.pdf 8-TX-c - Distributed Generation Interconnection.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the process for distributed generation (DG)

10

Generation Interconnection Policies and Wind Power: A Discussion of Issues, Problems, and Potential Solutions  

SciTech Connect (OSTI)

This report describes the adoption and implementation of FERC Order 2003 and the reasons for the sharp rise in generation interconnection filings in recent years.

Porter, K.; Fink, S.; Mudd, C.; DeCesaro, J.

2009-01-01T23:59:59.000Z

11

Interconnection Panel  

Broader source: Energy.gov [DOE]

Presentationgiven at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the interconnection panel, including an overview of the generation interconnection process (GIP), and interconnection agreements and their terms.

12

Re: Potomac River Generating Station Department of Energy Case No.  

Broader source: Energy.gov (indexed) [DOE]

Advanced Notice of Power Outages. Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No. 202-05-03: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the captioned proceeding, Order No. 202-05-03 ("December 20 Order"), Pepco will provide advance notification of the outages to Mirant, PJM, the Department of Energy ("Department"), the Federal Energy Regulatory Commission, the Environmental Protection Agency,

13

Re: Potomac River Generating Station Department of Energy Case No.  

Broader source: Energy.gov (indexed) [DOE]

PEPCO is providing you with information regarding the planned PEPCO is providing you with information regarding the planned transmission maintenance outage Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage Docket No. EO-05-01. Order No. 202-07-02: Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during

14

Response from PJM Interconnection LLC and Pepco to Department...  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

15

Design of Computer Generated Binary Holograms for Free Space Optical Interconnections  

Science Journals Connector (OSTI)

The purpose of this Chapter is to give an introduction to the use of computer generated holograms (CGHs) as free space optical interconnection elements. We will focus mainly on the techniques for designing bin...

I. Montrosset; D. Cojoc; F. Sartori

1997-01-01T23:59:59.000Z

16

Interconnection of on-site photovoltaic generation to the electric utility. [Conference paper  

SciTech Connect (OSTI)

Electrical interconnection with the local electric utility of small, privately owned, on-site photovoltaic generating systems will be necessary. Legal guidelines exist through PURPA, administered by FERC, to establish interconnection, but economic viability will be the deciding factor in constructing photovoltaic generating systems. Although nationally recognized technical standards do not yet exist for interconnecting photovoltaic generation with an electric utility, most utilities have considered the need for developing cogeneration standards, and a few have developed such standards independently. Additional costs incurred by utilities in providing service interconnections to customers with cogeneration will be passed along to those customers, either as a direct assessment or as part of the applicable rate schedule. An economic-analysis methodology has been developed to allow comparing various possible photovoltaic-generating-system configurations under different utility rate structures and varying economic climates on a consistent basis.

Eichler, C.H.; Kilar, L.A.; Stiller, P.H.

1980-01-01T23:59:59.000Z

17

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov [DOE]

Presentation covers the topic of "Renewable Generation and Interconnection to the Electrical Grid in Southern California," given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

18

California Nuclear Profile - San Onofre Nuclear Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

San Onofre Nuclear Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

19

New Jersey Nuclear Profile - PSEG Hope Creek Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

PSEG Hope Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

20

New Jersey Nuclear Profile - PSEG Salem Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

PSEG Salem Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Panel Dan Tunnicliff, P.E. Manager, Government Segment, Southern California Edison Southern California Edison Application Processing Technical Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Overview of Generation Interconnection Process (GIP) * Transmission Level Interconnections - Governed by CAISO Tariff. * Generally for 220 kV and higher. * All applications must be submitted to the CAISO. * CAISO administers its tariff, which is approved by FERC. * Distribution Level Interconnections - Governed by SCE's WDAT. * Generally below 220 kV. * All applications must be submitted to SCE. * SCE administers its tariff, which is approved by FERC. 2 Southern California Edison Interconnection agreements are critically

22

Power System Generation and Inter-Connection Planning Model (SUPER) | Open  

Open Energy Info (EERE)

Power System Generation and Inter-Connection Planning Model (SUPER) Power System Generation and Inter-Connection Planning Model (SUPER) Jump to: navigation, search Tool Summary Name: Power System Generation and Inter-Connection Planning Model (SUPER) Agency/Company /Organization: Latin American Energy Organization Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Resource assessment Resource Type: Software/modeling tools Website: www.olade.org/superEn.html References: SUPER website [1] "This model is useful for multi-year electricity system planning studies, making it possible to analyze, optimize, simulate and develop hydrothermal power system expansion plans." References ↑ "SUPER website" Retrieved from "http://en.openei.org/w/index.php?title=Power_System_Generation_and_Inter-Connection_Planning_Model_(SUPER)&oldid=329

23

On-Site Hydrogen Generation & Refueling Station  

E-Print Network [OSTI]

Reforming based refueling station DOE Objectives Public education on hydrogen and fuel cells Evaluation cell & HCNG busses in commercial operation ­ Refueling fuel cell & HCNG street sweepers and cars Thermal Reforming of natural gas Demonstrate hydrogen fueling station #12;Performance goals 15 min per bus

24

Potomac River Generating Station Dept. of Energy Case No. EO-05-01; September 8, 2005  

Broader source: Energy.gov (indexed) [DOE]

Craig A. Glazer Craig A. Glazer Vice President - Federal Government Policy PJM Washington Office (202) 393-7756 .FAX (202) 393-7741 e-mail: glazec@pjm.com CRITICAL ENERGY INFRASTRUCTURE INFORMATION HAS BEEN REMOVED FROM THIS SUBMITTAL FOR PRIVILEGED TREATMENT September 8, 2005 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Dept. of Energy Case No. EO-05-01 Dear Mr. Mansueti: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the unavailability of the Potomac River Generating Station to serve load in the D.C. area.

25

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Broader source: Energy.gov (indexed) [DOE]

SOUTHERN CALIFORNIA EDISON® SOUTHERN CALIFORNIA EDISON® SM 1 Federal Utility Partnership Working Group Providence, Rhode Island April 15, 2010 Renewable Generation and Interconnection to the Electrical Grid in Southern California Daniel Tunnicliff, P.E. Manager, Government & Institutions SOUTHERN CALIFORNIA EDISON® SM 2 Overview * SCE Overview * SCE Procurement Objectives * Renewable Procurement * Challenges to Meeting Renewable Goals in California * Interconnection Processes * Lessons Learned SOUTHERN CALIFORNIA EDISON® SM 3 SCE Overview * Large system  13 million residents  4.8 million customer accounts  50,000-square-mile service area * Nation's leader in environmental solutions  Energy efficiency  Renewable energy procurement  Electric transportation  Advanced meters  Smart grid

26

Assessment of district energy supply from Schiller Generating Station  

SciTech Connect (OSTI)

This paper addresses the feasibility analysis of retrofitting the Public Service of New Hampshire Schiller Generating Station to supply district heating to potential customers. The project involved analysis of power plant retrofit and comparison of district heating cost to the cost of heat supplied with gas boilers for a housing development in close proximity to the Schiller Station.

Hitchko, M. [Public Service Company of New Hampshire, Portsmouth, NH (United States); Major, W. [Joseph Technology Corporation, Inc., Woodcliff Lake, NJ (United States)

1995-06-01T23:59:59.000Z

27

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Interconnect Issues in NE Serge Khalife, 15 th April 2010 Agenda  About National Grid and Service territories  Scope and definitions  Interconnection Process Overview  Time Frames and Fees  Governmental Entity Exceptions  Net Metering Limit  Technical Issues  Observations and recommendations  Questions and Answers Service Territories Map Scope and definitions  The Distributed Generation Group at National Grid process interconnection applications on the distribution system typically 10 MW and under with a few exceptions.  ISO-NE process larger interconnection applications on the transmission system. Their timelines and procedures vary from National Grid's Distributed Generation process.  Governmental Entity : The Commonwealth of Massachusetts, or any

28

The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Relevance of Generation The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland Subcontract Report NREL/SR-6A20-48987 October 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States Sari Fink, Kevin Porter, and Jennifer Rogers Exeter Associates, Inc. Columbia, Maryland

29

WWTP Power Generation Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Power Generation Station Biomass Facility Power Generation Station Biomass Facility Jump to: navigation, search Name WWTP Power Generation Station Biomass Facility Facility WWTP Power Generation Station Sector Biomass Facility Type Non-Fossil Waste Location Alameda County, California Coordinates 37.6016892°, -121.7195459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.6016892,"lon":-121.7195459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

30

Springerville Generating Station Solar System Solar Power Plant | Open  

Open Energy Info (EERE)

Springerville Generating Station Solar System Solar Power Plant Springerville Generating Station Solar System Solar Power Plant Jump to: navigation, search Name Springerville Generating Station Solar System Solar Power Plant Facility Springerville Generating Station Solar System Sector Solar Facility Type Photovoltaic Developer Tucson Electric Power Location Springerville, Arizona Coordinates 34.1333799°, -109.2859196° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.1333799,"lon":-109.2859196,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

31

Ottawa Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Generating Station Biomass Facility Generating Station Biomass Facility Jump to: navigation, search Name Ottawa Generating Station Biomass Facility Facility Ottawa Generating Station Sector Biomass Facility Type Landfill Gas Location Ottawa County, Michigan Coordinates 42.953023°, -86.0937312° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.953023,"lon":-86.0937312,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

32

Grand Blanc Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Grand Blanc Generating Station Biomass Facility Grand Blanc Generating Station Biomass Facility Jump to: navigation, search Name Grand Blanc Generating Station Biomass Facility Facility Grand Blanc Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

33

Brent Run Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Brent Run Generating Station Biomass Facility Brent Run Generating Station Biomass Facility Jump to: navigation, search Name Brent Run Generating Station Biomass Facility Facility Brent Run Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

34

Peoples Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Peoples Generating Station Biomass Facility Peoples Generating Station Biomass Facility Jump to: navigation, search Name Peoples Generating Station Biomass Facility Facility Peoples Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

35

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-01-01T23:59:59.000Z

36

Underwriters Laboratories: Streamlining Interconnection  

SciTech Connect (OSTI)

Summarizes Underwriters Laboratories' work under contract to DOE's Distribution and Interconnection R&D to develop a streamlined system to interconnect distributed generators with the utility grid.

Not Available

2003-10-01T23:59:59.000Z

37

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

stations and then deliver that energy through the interconnected transmission and distribution systems are important factors for electricity enterprises to consider in their planning activities. One new important Abstract: Electric power systems of today are experiencing a difficulty of constrained transmission lines

Gross, George

38

"1. Braidwood Generation Station","Nuclear","Exelon Nuclear",2330  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois" Illinois" "1. Braidwood Generation Station","Nuclear","Exelon Nuclear",2330 "2. Byron Generating Station","Nuclear","Exelon Nuclear",2300 "3. LaSalle Generating Station","Nuclear","Exelon Nuclear",2238 "4. Baldwin Energy Complex","Coal","Dynegy Midwest Generation Inc",1785 "5. Quad Cities Generating Station","Nuclear","Exelon Nuclear",1774 "6. Dresden Generating Station","Nuclear","Exelon Nuclear",1734 "7. Powerton","Coal","Midwest Generations EME LLC",1538 "8. Elwood Energy LLC","Gas","Dominion Elwood Services Co",1350

39

Methane generation at Grand Gulf Nuclear Station  

SciTech Connect (OSTI)

The methane generation at Grand Gulf has been brought to light twice. The initial event occurred in February 1990 and the second in December 1993. Both events involved the receipt of a cask at Barnwell Waste Management Facility that when opened indicated a gas escaping. The gas was subsequently sampled and indicated a percentage of explosive gas. Both events involved powdered resin and indicated that the generation was from a bacterial attack of the organic materials (cellulose in the powdered resin mixture). The first event occurred and was believed to be isolated in a particular waste stream. The situation was handled and a biocide was found to be effective in treatment of liners until severe cross contamination of another waste stream occurred. This allowed the shipment of a liner that was required to be sampled for explosive gases. The biocide used by GGNS was allowed reintroduction into the floor drains and this allowed the buildup of immunity of the bacterial population to this particular biocide. The approval of a new biocide has currently allowed GGNS to treat liners and ship them offsite.

Carver, M.L. [Entergy Operations, Inc., Grand Gulf Nuclear Station, Port Gibson, MS (United States)

1995-09-01T23:59:59.000Z

40

Interconnection | Open Energy Information  

Open Energy Info (EERE)

Interconnection Interconnection Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some state’ standards apply only to investor-owned utilities, – not to municipal utilities and electric cooperatives. [1]

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Tri-Generation Success Story: World's First Tri-Gen EnergyStation...  

Broader source: Energy.gov (indexed) [DOE]

Tri-Generation Success Story: World's First Tri-Gen Energy Station-Fountain Valley Tri-Generation Success Story: World's First Tri-Gen Energy Station-Fountain Valley This Fuel Cell...

42

Distributed Generation Study/Dakota Station (Minnegasco) | Open Energy  

Open Energy Info (EERE)

Station (Minnegasco) Station (Minnegasco) < Distributed Generation Study Jump to: navigation, search Study Location Burnsville, Minnesota Site Description Other Utility Study Type Case Study Technology Microturbine Prime Mover Capstone C30 Heat Recovery Systems Unifin Fuel Natural Gas System Installer Capstone Turbine Corp System Enclosure Outdoor System Application Combined Heat and Power Number of Prime Movers 1 Stand-alone Capability None Power Rating 30 kW0.03 MW 30,000 W 30,000,000 mW 3.0e-5 GW 3.0e-8 TW Nominal Voltage (V) 0 Heat Recovery Rating (BTU/hr) 290000 Cooling Capacity (Refrig/Tons) Origin of Controller Manufacturer-Integrated Component Integration Customer Assembled Start Date 2000/03/13 Monitoring Termination Date 2002/03/31 Primary Power Application Based Load

43

Re: Potomac River Generating Station Department of Energy Case...  

Broader source: Energy.gov (indexed) [DOE]

Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the...

44

Modelling fly ash generation for UK power station coals  

SciTech Connect (OSTI)

An in-depth characterization has been made of three UK bituminous coals and the combustion products from these coals when burned at a power station and on a range of experimental combustion facilities. The coals were chosen to represent the range of ash compositions and slagging propensities found at UK power stations. CCSEM analysis of the pulverized coals has been performed to provide quantitative data on the size and chemical composition of individual mineral occurrences, and to determine the nature of the mineral-mineral and mineral-organic associations in the pulverized fuel. In a similar way the size and chemical composition of individual fly ash particle has been determined. The mineral-mineral association information has been used to predict the effects of mineral coalescence, the dominant mineral transformation process for UK power station coals. The CCSEM information correctly identifies the types of mineral-mineral association and hence the predicted effects of coalescence. The limitations of the information are inherent in the analysis of a cross-section, but useful information for the modelling of ash generation may still be obtained.

Wigley, F.; Williamson, J. [Imperial Coll., London (United Kingdom). Dept. of Materials

1996-12-31T23:59:59.000Z

45

Response from PJM Interconnection LLC and Pepco to Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection LLC and Pepco to Department of PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for information concerning the potential need for Potomac River Station generation under the three reliability "scenarios" outlined by PJM and PEPCO. Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation More Documents & Publications Information Concerning Reliability Impacts under Various System

46

Re: Potomac River Generating Station Department of Energy, Case No.  

Broader source: Energy.gov (indexed) [DOE]

No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of Energy's Order No. 202-05-3 issued December 20, 2005 ("DOE Potomac River Order"), Pepco has filed notice of the planned outages, in sequence during January 2006, of each of the two 230 kV circuits serving the downtown area of the District of Columbia. Earlier scheduled maintenance on these lines was postponed because of the shutdown of Mirant's Potomac River Generating Plant, but a recent forced outage on one of the lines makes it imprudent to delay maintenance any longer. Department of Energy Order No. 202-05-03 Notice of Planned Outages, in Sequence During January 2006 More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages

47

Analysis of the Behavior of Electric Vehicle Charging Stations with Renewable Generations  

E-Print Network [OSTI]

engine vehicles refuel at gas stations, EVs might also be charged at other facilities which provideAnalysis of the Behavior of Electric Vehicle Charging Stations with Renewable Generations Woongsup between electric vehicle charging stations (EVCSs) with renewable electricity generation facilities (REGFs

Wong, Vincent

48

Record of Decision for the Electrical Interconnection of the Plymouth Generating Facility (DOE/EIS-0345)(10/14/03)  

Broader source: Energy.gov (indexed) [DOE]

for the Electrical Interconnection of the Plymouth Generating Facility October 2003 THE DECISION The Bonneville Power Administration (BPA) has decided to implement the proposed action identified in the Plymouth Generating Facility (PGF) Final Environmental Impact Statement (FEIS) (DOE/EIS-0345, June 2003). The PGF, which has been proposed by Plymouth Energy, LLC (Plymouth Energy), involves construction and operation of a 307-megawatt (MW) natural gas-fired, combined-cycle power generation facility on a 44.5-acre site 2 miles west of Plymouth in Benton County, Washington. Under the proposed action, BPA will offer contract terms for interconnection of the PGF into the Federal Columbia River Transmission System (FCRTS) at BPA's proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately

49

Re: Potomac River Generating Station Department of Energy Case...  

Broader source: Energy.gov (indexed) [DOE]

Order No. 202-05-03: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the...

50

Re: Potomac River Generating Station Department of Energy, Case No.  

Broader source: Energy.gov (indexed) [DOE]

evised plan for evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the following information regarding the revised plan for transmission outages for the 230 kV circuits that are scheduled during the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the above-captioned proceeding, Order No. 202-05-03, and pursuant to the expanded notice required in Order No. 202-07-02, issued on January 31 Order, Pepco will provide advance notification of the outages to Mirant,

51

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

52

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect (OSTI)

During the period October 1, 2003-December 31, 2003, Allegheny Energy Supply Co., LLC (Allegheny) continued with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of biomass cofiring into commercial operations, including evaluating new sources of biomass supply. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2004-01-01T23:59:59.000Z

53

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect (OSTI)

During the period April 1, 2003--June 30, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of biomass cofiring into commercial operations. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2003-07-01T23:59:59.000Z

54

World's First Tri-Generation Fuel Cell and Hydrogen Fueling Station  

Office of Energy Efficiency and Renewable Energy (EERE)

EERE supported the development of the world's first tri-generation station combined heat and power system that produces hydrogen in addition to heat and electricity.

55

Next Generation Hydrogen Station Composite Data Products: Data through Quarter 4 of 2013  

SciTech Connect (OSTI)

This report includes 25 composite data products (CDPs) produced for next generation hydrogen stations, with data through quarter 4 of 2013.

Sprik, S.; Kurtz, J.; Peters, M.

2014-05-01T23:59:59.000Z

56

Application of PV panels into electricity generation system of compression stations in gas transporting systems.  

E-Print Network [OSTI]

?? This thesis deals with problems of electricity generation and saving at compression stations of magistral gas transporting pipelines in Russia. Russia is a biggest (more)

Belyaev, Alexey

2013-01-01T23:59:59.000Z

57

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Indiana Program Type Interconnection Provider Indiana Utility Regulatory Commission In November 2005, the Indiana Utility Regulatory Commission (IURC) approved rules governing the interconnection of distributed generation (DG). Indiana's interconnection rules require the state's investor-owned utilities to provide three levels of interconnection to customer-generators.

58

Tri-Generation Success Story: World's First Tri-Gen Energy StationFountain Valley  

Broader source: Energy.gov [DOE]

This Fuel Cell Technologies Office fact sheet describes the Fountain Valley energy station. Supported in part by a $2.2 million grant from the Energy Department, the Fountain Valley energy station is the worlds first tri-generation hydrogen energy and electrical power station to provide transportation fuel to the public and electric power to an industrial facility.

59

"1. Mystic Generating Station","Gas","Boston Generating LLC",1968  

U.S. Energy Information Administration (EIA) Indexed Site

Massachusetts" Massachusetts" "1. Mystic Generating Station","Gas","Boston Generating LLC",1968 "2. Brayton Point","Coal","Dominion Energy New England, LLC",1545 "3. Canal","Petroleum","Mirant Canal LLC",1119 "4. Northfield Mountain","Pumped Storage","FirstLight Power Resources Services LLC",1080 "5. Salem Harbor","Coal","Dominion Energy New England, LLC",744 "6. Fore River Generating Station","Gas","Boston Generating LLC",688 "7. Pilgrim Nuclear Power Station","Nuclear","Entergy Nuclear Generation Co",685 "8. Bear Swamp","Pumped Storage","Brookfield Power New England",600

60

Analysis of the Impact of Balancing Area Cooperation on the Operation of the Western Interconnection with Wind and Solar Generation (Presentation)  

SciTech Connect (OSTI)

This presentation describes the analysis of the impact of balancing area cooperation on the operation of the Western Interconnection with wind and solar generation, including a discussion of operating reserves, ramping, production simulation, and conclusions.

Milligan, M.; Lew, D.; Jordan, G.; Piwko, R.; Kirby, B.; King, J.; Beuning, S.

2011-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Interconnection Standards | Open Energy Information  

Open Energy Info (EERE)

Interconnection Standards Interconnection Standards Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some states’ standards apply only to investor-owned utilities – not to municipal utilities and electric cooperatives. [1]

62

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Solar Wind Program Info State Nevada Program Type Interconnection Provider Public Utilities Commission of Nevada In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of

63

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Energy Sources Solar Wind Program Info State Maine Program Type Interconnection Provider Maine Public Utilities Commission The Maine Public Utility Commission (PUC) adopted interconnection procedures in January 2010. These rules apply to all transmission and distribution utilities operating in the state and apply to all distribution generation (not just renewables). Maine's interconnection procedures, based in part on the Interstate Renewable Energy Council Inc. 2006 Model Interconnection Procedures,* identify four different tiers with

64

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

65

Biofouling control with ozone at the Bergen Generating Station  

SciTech Connect (OSTI)

The results of a study designed to evaluate the effectiveness of ozone as an alternative to chlorine for condenser biofouling control in a once-through cooling system are reported. Tests were conducted at PSE and G's Bergen Generating Station using a pilot-scale condenser system to simulate plant condenser operations. Three model condensers were operated under identical conditions with only the biocide treatment differing. Comparisons of ozone and chlorine were made and the minimum effective levels of each were determined by daily measurements of the heat transfer coefficient across the model condenser tubes and/or the water side pressure drop. Final evaluation was based on the mass of biofouling material collected from the tubewalls. Test results indicate that chlorine is capable of effective biofouling control when applied for 2 hours/day at a level as low as 0.1 mg/l. Ozone, applied on the same schedule, requires 0.5 mg/l for effective control. The results of this study are representative of only the Bergen site. Water quality at each particular site will influence the development of the biofouling organisms, the chemical reactions of the biocides, and therefore, the effectiveness of the treatment methodology. The results suggest that further examination of ozonation for biofouling control is warranted. Although much more costly than chlorine, its effects on indigenous ecosystems may prove ozone to be better suited for application at selected power plants. It must be emphasized, however, that much more information is necessary before ozone can be recommended as an environmentally acceptable alternative to chlorine.

Sugam, R.; Guerra, C.R.; DelMonaco, J.L.; Singletary, J.H.; Sandvik, W.A.

1980-11-01T23:59:59.000Z

66

Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection  

SciTech Connect (OSTI)

This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; Beuning, S.

2012-05-01T23:59:59.000Z

67

Tri-Generation Success Story: World's First Tri-Gen Energy Station - Fountain Valley  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tri-Generation Success Tri-Generation Success Story World's First Tri-Gen Energy Station- Fountain Valley The Fountain Valley energy station, supported in part by a $2.2 million grant from the Energy Department, is the world's first tri-generation hydrogen energy and electrical power station to provide transportation fuel to the public and electric power to an industrial facility. Located at the Orange County Sanitation District's wastewater treatment plant in Fountain Valley, California, the unit is a combined heat, hydrogen, and power (CHHP) system that co-produces hydrogen in addition to electricity and heat, making it a tri-generation system. The hydrogen produced by the system

68

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Oregon Program Type Interconnection Provider Oregon Public Utility Commission Oregon has three separate interconnection standards: one for net-metered systems, one for small generator facilities (non-net metered systems) and one for large generator facilities (non-net metered systems). Oregon has also established separate net metering requirements and interconnection standards for the state's primary investor-owned utilities (PGE and

69

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State North Carolina Program Type Interconnection Provider North Carolina Utilities Commission The North Carolina Utilities Commission (NCUC) adopted comprehensive interconnection standards for distributed generation in June 2008. The NCUC standards, which are similar to the Federal Energy Regulatory Commission's (FERC) interconnection standards for small generators,

70

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect (OSTI)

During the period July 1, 2003-September 30, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of bio mass cofiring into commercial operations, including evaluating new sources of biomass supply. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. During this period, a major presentation summarizing the program was presented at the Pittsburgh Coal Conference. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2003-10-01T23:59:59.000Z

71

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect (OSTI)

During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gas emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.

K. Payette; D. Tillman

2001-10-01T23:59:59.000Z

72

Record of Decision for the Electrical Interconnection of the Chehalis Generation Facility (DOE/EIS-0230)(5/17/01)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Chehalis Generation Facility May 2001 _______________________________________________________ SUMMARY Bonneville Power Administration (BPA) has decided to offer contracts for integrating power from the Chehalis Generation Facility (CGF) into the Federal Columbia River Transmission System (FCRTS). These contracts will facilitate integration of power from CGF into the FCRTS for delivery to the wholesale power market. In reaching this decision, I have considered the potential environmental impacts addressed in BPA's Resource Contingency Program Environmental Impact Statement (RCP EIS, DOE/EIS-0230, November 1995), Supplement Analysis (SA, DOE/EIS-0230/SA-02, May 9, 2001), BPA's Business Plan Environmental Impact Statement (BP EIS, DOE/EIS-

73

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Texas Program Type Interconnection Provider Public Utility Commission of Texas The Texas Public Utility Regulatory Act (PURA) of 1999 included a provision that "a customer is entitled to have access to on-site distributed generation". As a result, the Public Utility Commission of Texas (PUCT) adopted interconnection standards in 1999. The rules apply to electrical generating facilities (consisting of one or more on-site distributed-generation units) located at a customer's point of delivery,

74

Testing of power-generating gas-turbine plants at Russian electric power stations  

Science Journals Connector (OSTI)

This paper cites results of thermal testing of various types and designs of power-generating gas-turbine plants (GTP), which have been placed in service at electric-power stations in Russia in recent years. Therm...

G. G. Olkhovskii; A. V. Ageev; S. V. Malakhov

2006-07-01T23:59:59.000Z

75

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Michigan Program Type Interconnection Provider Michigan Public Service Commission The Michigan Public Service Commission (PSC) first adopted interconnection standards for distributed generation (DG) in September 2003. The original standards provided for 5 levels of interconnection with cutoffs at 30 kilowatts (kW), 150 kW, 750 kW, and 2 megawatts (MW), but left many details

76

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State District of Columbia Program Type Interconnection Provider Washington Utilities and Transportation Commission In September 2007, the Washington Utilities and Transportation Commission (UTC) adopted interconnection standards for distributed generation (DG) systems up to 20 megawatts (MW) in capacity. The revised standards provide for two separate levels of interconnection based on system capacity. The

77

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Wind Program Info State Maryland Program Type Interconnection Provider Maryland Public Service Commission In April 2007, Maryland enacted legislation ([http://mgaleg.maryland.gov/2007RS/chapters_noln/Ch_119_sb0595E.pdf S.B. 595]) requiring the Maryland Public Service Commission (PSC) to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted

78

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Arizona Program Type Interconnection Provider Arizona Corporation Commission '''''Note: In June 2007, the Arizona Corporation Commission (ACC) initiated a rulemaking process to establish statewide interconnection standards for distributed generation (DG). This proceeding is still in progress. Until the new official rules go into effect, the commission has recommended that the utilities use the [http://images.edocket.azcc.gov/docketpdf/0000074361.pdf Interconnection

79

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Hawaii Program Type Interconnection Provider Hawaii Public Utilities Commission Hawaii has established simplified interconnection rules for small renewables and separate rules for all other distributed generation (DG). For inverter-based systems up to 10 kilowatts (kW) in capacity (and inverter-based DG under 250 kW on islands other than Kauai), there is a simple application process for interconnection. Systems must use inverters

80

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Interconnection Provider Pennsylvania Public Utility Commission The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG)

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State South Dakota Program Type Interconnection Provider S.D. Public Utilities Commission South Dakota's interconnection standards for distributed generation, adopted by the state Public Utilities Commission (PUC) in May 2009, apply to customers of investor-owned utilities.* The rules provide for four levels of interconnection for systems up to 10 megawatts (MW) in capacity:

82

Re: Potomac River Generating Station Department of Energy, Case...  

Broader source: Energy.gov (indexed) [DOE]

the downtown area of the District of Columbia. Earlier scheduled maintenance on these lines was postponed because of the shutdown of Mirant's Potomac River Generating Plant, but...

83

Notification of Planned 230kV Outage at Potomac River Generating Station  

Broader source: Energy.gov (indexed) [DOE]

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

84

Market Characteristics for Efficient Integration of Variable Generation in the Western Interconnection  

SciTech Connect (OSTI)

The overriding purpose of this report is to establish the physical requirements of a power system that can accommodate high levels of variable generation.

Milligan, M.; Kirby, B.

2010-08-01T23:59:59.000Z

85

Connecting to the Grid: A Guide to Distributed Generation Interconnection Issues, 6th Edition, 2009  

Broader source: Energy.gov [DOE]

This guide addresses issues relevant to all DG technologies, including net excess generation, third-party ownership, energy storage and networks

86

Short-Circuit Characteristics of Asynchronous Generators and Double-Fed Induction Generators Inter-connected Grid  

Science Journals Connector (OSTI)

In this paper, the electrical transient mode of induction generators is studied, establishing the short-circuit current sequence component of wind generators are when faulty occuring in collect feeder, ... type, ...

Su Chang-Sheng; Li Feng-Ting; Liu Wei

2011-01-01T23:59:59.000Z

87

Assessment of district heating and cooling supply from Goudey Generating Station  

SciTech Connect (OSTI)

This paper addresses the feasibility analysis of retrofitting the New York State Electric and Gas (NYSEG) Goudey Generating Station for district heating and cooling supply to the SUNY-Binghamton Campus. The project involved detailed analysis of the power plant retrofit, dispatch analysis of the retrofitted Goudey Station in the New York Power Pool, environmental and permitting assessment, retrofit analysis of the SUNY campus to low temperature hot water and economic analysis.

McIntire, M.E.; Hall, D.; Beal, D.J. [New York State Electric & Gas Corporation, Binghamton, NY (United States)] [and others

1995-06-01T23:59:59.000Z

88

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect (OSTI)

During the period October 1, 2001--December 31, 2001, Allegheny Energy Supply Co., LLC (Allegheny) completed construction of the Willow Island cofiring project. This included completion of the explosion proof electrical wiring, the control system, and the control software. Procedures for system checkout, shakedown, and initial operation were initiated during this period. During this time period the 100-hour test of the Albright Generating Station cofiring facility was completed. The testing demonstrated that cofiring at the Albright Generating Station could reliably contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gas emissions over a significant load range. During this period of time Allegheny Energy conducted facility tours of both Albright and Willow Island for the Biomass Interest Group of the Electric Power Research Institute. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the completion of construction activities at the Willow Island site along with the 100-hr test at the Albright site.

K. Payette; D. Tillman

2002-01-01T23:59:59.000Z

89

DESIGNING AND OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

SciTech Connect (OSTI)

During the period July 1, 2000-March 31, 2004, Allegheny Energy Supply Co., LLC (Allegheny) conducted an extensive demonstration of woody biomass cofiring at its Willow Island and Albright Generating Stations. This demonstration, cofunded by USDOE and Allegheny, and supported by the Biomass Interest Group (BIG) of EPRI, evaluated the impacts of sawdust cofiring in both cyclone boilers and tangentially-fired pulverized coal boilers. The cofiring in the cyclone boiler--Willow Island Generating Station Unit No.2--evaluated the impacts of sawdust alone, and sawdust blended with tire-derived fuel. The biomass was blended with the coal on its way to the combustion system. The cofiring in the pulverized coal boiler--Albright Generating Station--evaluated the impact of cofiring on emissions of oxides of nitrogen (NO{sub x}) when the sawdust was injected separately into the furnace. The demonstration of woody biomass cofiring involved design, construction, and testing at each site. The results addressed impacts associated with operational issues--capacity, efficiency, and operability--as well as formation and control of airborne emissions such as NO{sub x}, sulfur dioxide (SO{sub 2}2), opacity, and mercury. The results of this extensive program are detailed in this report.

K. Payette; D. Tillman

2004-06-01T23:59:59.000Z

90

Interconnection Resources  

Broader source: Energy.gov [DOE]

Interconnection is the technical procedures and legal requirements surrounding energy customers' ability to connect their small-scale renewable energy projects with the electricity grid. The...

91

Interconnection Standards  

Broader source: Energy.gov [DOE]

In July 2010, the Montana Public Service Commission (PSC) adopted interconnection rules, effective August 13, 2010. These rules apply to all electric utilities under the PSC's jurisdiction,...

92

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Solar Wind Program Info State Virginia Program Type Interconnection Provider Virginia State Corporation Commission Virginia has two interconnection standards: one for net-metered systems and one for systems that are not net-metered. '''Interconnection for Net-Metered Systems''' Customer-generators that net meter must comply with the interconnection rules within the regulations governing net metering (20 VAC 5-315-40). These rules apply to residential customers generating up to 10 kW* and commercial systems of up to 500 kW (or greater if the utility's net

93

Is central station generation becoming a white elephant  

SciTech Connect (OSTI)

Cost increases encourage the development of alternative sources of energy, and some of the alternatives currently under development lend themselves to moving the generation location back to load centers. In addition, some alternative sources have short lead times and minimal environmental impact, and are being subsidized through income tax policy. Alternative sources of energy have the potential for beginning to affect the usefulness of electric-generating plants and their high-voltage transmission networks before the end of this century. If this comes about, the electric utility industry may find its position similar to that of the telephone industry - with obsolete facilities not fully depreciated. The scenario discussed here would not come about all at once and may not come about at all. But it is the authors opinion that the chances are greater than fifty-fifty that it or something similar will affect the usefulness of bulk power supply systems sometime during the lifetime of generating units installed during the past ten years.

Ferguson, J.S.

1985-03-21T23:59:59.000Z

94

Bruce Nuclear Generating Station B rapid cooldown test and validation of simulation model  

SciTech Connect (OSTI)

The SOPHT code was assessed against Bruce Nuclear Generating Station B commissioning data from a heat transport system rapid cooldown. It was found that (a) under a rapid upstream depressurization, the steam relief valves, like orifices, had a lower discharge coefficient than the corresponding steadystate value and (b) the flashing of water in the steam generators during depressurization causes the at-power boiling heat transfer correlations to overpredict the steam generator heat transfer.

Chang, Y.F.; Langan, M.D.; Sermer, P.; Watson, P.C.

1985-09-01T23:59:59.000Z

95

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Wind Program Info State Iowa Program Type Interconnection Provider Iowa Utilities Board Different rules govern the interconnection of distributed generation facilities in Iowa, depending on whether or not the interconnection is with a utility whose rates are regulated by the Iowa Utilities Board (IUB). Rate regulated utilities include only the state's two investor-owned utilities -- MidAmerican Energy and Interstate Power and Light (IPL) -- and Linn

96

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Program Info State Vermont Program Type Interconnection Provider Vermont Public Service Board Vermont has adopted separate interconnection standards for net-metered energy systems that are 150 kW or less, and for all other distributed-generation (DG) systems. '''Interconnection Standards for Net-Metered Systems 150 kW or less''' Vermont requires electric utilities to offer net metering to all customers with photovoltaic (PV) systems, wind-energy systems, fuel cells or

97

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Wisconsin Program Type Interconnection Provider Public Service Commission of Wisconsin In February 2004, the Wisconsin Public Service Commission adopted interconnection standards for distributed generation (DG) systems up to 15 megawatts (MW) in capacity. All investor-owned utilities (IOUs) and municipal utilities are required to abide by the standard provisions.

98

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State South Carolina Program Type Interconnection Provider Public Service Commission of South Carolina The South Carolina Public Service Commission (PSC) adopted simplified interconnection guidelines for small distributed generation (DG) in December 2006. These guidelines address renewable-energy systems and other forms of DG up to 20 kilowatts (kW) in capacity for residential systems,

99

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Bioenergy Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Nebraska Program Type Interconnection Provider Nebraska Energy Office Nebraska enacted legislation in May 2009 [http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf (LB 436)], establishing general rules for interconnecting and net metering systems that generate electricity. Nebraska's policy applies to systems that use solar, wind, methane, biomass, hydropower or geothermal resources to produce electricity and have a rated capacity of 25 kilowatts (kW) or less. To be eligible, a facility must meet all applicable safety, performance,

100

D.McNew/GettyIMaGes San Onofre Nuclear Generating Station, California.  

E-Print Network [OSTI]

D.McNew/GettyIMaGes San Onofre Nuclear Generating Station, California. CORRESPONDENCE Checklist be supplied by solar power plants covering about 36,000 square kilometres of land in the desert southwest,theycanberampedupquickly.Annualinstallationofwind- energy capacity in the United States has quadrupled from Counterpoint Not wanted, not needed J. Doyne

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Broader source: Energy.gov (indexed) [DOE]

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

102

Interconnect Issues  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decisions lay foundation for exception for utility contracts * Narrow exception GSA - Utility Interconnection Agreements * Application to Interconnection Agreements * Keys: Requirement for service Tariff or PSC action on contract

103

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Interconnection Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

104

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Missouri Program Type Interconnection Provider Missouri Department of Natural Resources Missouri enacted legislation (S.B. 54) in June 2007 requiring all of the state's electric utilities -- including municipal utilities and electric cooperatives -- to offer net metering to customers with systems up to 100 kilowatts (kW) in capacity that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells

105

Navajo Generating Station and Clean-Energy Alternatives: Options for Renewables  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Navajo Generating Station and Clean-Energy Alternatives: Options for Renewables D.J. Hurlbut, S. Haase, C.S. Turchi, and K. Burman National Renewable Energy Laboratory Produced under direction of the U.S. Department of the Interior by the National Renewable Energy Laboratory (NREL) under Interagency Agreement R11PG30024 and Task No WFJ5.1000. Technical Report NREL/TP-6A20-54706 June 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Navajo Generating Station and

106

Hopper Interconnect  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interconnect Interconnect Interconnect jaguar xt4 Hopper's "Gemini" network is connected in a 3D torus. Description Hopper's compute nodes are connected via a custom high-bandwidth, low-latency network provided by Cray. The connectivity is in the form of a "mesh" in which each node is connected to other nearby nodes like strands in a fishing net, except that the mesh extends in three dimensions. Each network node handles not only data destined for itself, but also data to be relayed to other nodes. Nodes at the "edges" of the mesh network are connected to nodes at the other edge to form a 3-D torus. The custom chips that route communication over the network are known as "Gemini" and the entire network is often referred to as the "Cray Gemini

107

Dynamic Simulation Studies of the Frequency Response of the Three U.S. Interconnections with Increased Wind Generation  

E-Print Network [OSTI]

Generator (Conventional Induction Generator): is connectedsquirrel cage" induction generator directly connected to theThe conventional induction generator cannot provide reactive

Mackin, Peter

2011-01-01T23:59:59.000Z

108

Microsoft Word - CX-RooseveltRadioStationGeneratorFY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

7, 2013 7, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Molly Kovaka Project Manager - TEP CSB-2 Proposed Action: Roosevelt Radio Station Emergency Generator Removal and Replacement Budget Information: Work Order # 300238 / 300235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately four miles north of Arlington, Oregon, in Klickitat County, Washington. T3N, R21E, Sec14 and Sec 6. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to maintain and improve the Roosevelt Radio Station. The proposed work includes removal and replacement of the existing 30-kilowatt

109

A practical design for an integrated HVDC unit - connected hydro-electric generating station  

SciTech Connect (OSTI)

To date, several authors (see reference list) have proclaimed benefits which can be achieved by integrating HVDC converter stations directly with generating units. The cost of a significant amount of plant and facilities found in conventional schemes is thereby eliminated. So far as is known however, no detailed studies have been done to quantify these benefits. This paper outlines the results of a study made recently by the Manitoba HVDC Research Centre to determine the practicality of such a scheme. To give credence to the results an actual hydro station design was used incorporating a HVDC thyristor valve scheme in a hypothetical situation. Financial and other benefits were determined for this example together with conclusions and recommendations for future specific projects and further areas of study.

Ingram, L. (Manitoba HVDC Research Centre, Winnipeg (CA))

1988-10-01T23:59:59.000Z

110

Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts (Revised), Energy Analysis, NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Navajo Generating Station Navajo Generating Station Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts David J. Hurlbut, Scott Haase, Gregory Brinkman, Kip Funk, Rachel Gelman, Eric Lantz, Christina Larney, David Peterson, Christopher Worley National Renewable Energy Laboratory Ed Liebsch HDR Engineering, Inc. Prepared under Task No. WFJ5.1000 Technical Report NREL/TP-6A20-53024 * Revised March 2012 Contract No. DE-AC36-08G028308 Produced under direction of the U.S. Department of the Interior by the National Renewable Energy Laboratory (NREL) under Interagency Agreement R11PG30024 and Task No. WFJ5.1000. ERRATA SHEET NREL REPORT/PROJECT NUMBER: NREL/TP-6A20-53024 DOE NUMBER: N/A TITLE: Navajo Generating Station and Air Visibility Regulations: Alternatives and

111

Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (DOE/EIS-0183)(10/19/01)  

Broader source: Energy.gov (indexed) [DOE]

for the for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. The West Coast is experiencing a shortfall in electric energy supply, as well as a volatile wholesale power market in which prices have reached record highs. The Project is one of

112

EIS-0415: Deer Creek Station Energy Facility Project, South Dakota  

Broader source: Energy.gov [DOE]

This EIS analyzes WAPA's decision to approve the interconnection request made by Basin Electric Power Cooperative (Basin Electric) with the USDA Rural Utilities Service (RUS) proposing to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility.

113

Staff Draft Report. Comparative Cost of California Central Station Electricity Generation Technologies.  

SciTech Connect (OSTI)

This Energy Commission staff draft report presents preliminary levelized cost estimates for several generic central-station electricity generation technologies. California has traditionally adopted energy policies that balance the goals of supporting economic development, improving environmental quality and promoting resource diversity. In order to be effective, such policies must be based on comprehensive and timely gathering of information. With this goal in mind, the purpose of the report is to provide comparative levelized cost estimates for a set of renewable (e.g., solar) and nonrenewable (e.g., natural gas-fired) central-station electricity generation resources, based on each technology's operation and capital cost. Decision-makers and others can use this information to compare the generic cost to build specific technology. These costs are not site specific. If a developer builds a specific power plant at a specific location, the cost of siting that plant at that specific location must be considered. The Energy Commission staff also identifies the type of fuel used by each technology and a description of the manner in which the technology operates in the generation system. The target audiences of this report are both policy-makers and anyone wishing to understand some of the fundamental attributes that are generally considered when evaluating the cost of building and operating different electricity generation technology resources. These costs do not reflect the total cost to consumers of adding these technologies to a resources portfolio. These technology characterizations do not capture all of the system, environmental or other relevant attributes that would typically be needed by a portfolio manager to conduct a comprehensive ''comparative value analysis''. A portfolio analysis will vary depending on the particular criteria and measurement goals of each study. For example, some form of firm capacity is typically needed with wind generation to support system reliability. [DJE-2005

Badr, Magdy; Benjamin, Richard

2003-02-11T23:59:59.000Z

114

Development of an HTS hydroelectric power generator for the hirschaid power station  

Science Journals Connector (OSTI)

This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

Ruben Fair; Clive Lewis; Joseph Eugene; Martin Ingles

2010-01-01T23:59:59.000Z

115

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alternative Fuel Vehicles Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Utah Program Type Interconnection Provider Utah Public Service Commission Utah requires the state's only investor-owned utility, Rocky Mountain Power (RMP), and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind energy, hydropower, hydrogen, biomass, landfill gas, geothermal energy, waste gas or waste heat capture and recovery. The bill that established net metering also established some basic rules for interconnection. In April 2010, the Utah Public Service Commission (PSC) adopted final rules for interconnection. The rules described below took effect April 30, 2010.

116

Dynamic Simulation Studies of the Frequency Response of the Three U.S. Interconnections with Increased Wind Generation  

E-Print Network [OSTI]

wind turbine through a gearbox, and uses a conventional "squirrel cage" induction generator directly connected to the grid.

Mackin, Peter

2011-01-01T23:59:59.000Z

117

Advanced Interconnect Development  

SciTech Connect (OSTI)

The objectives of this project are to develop cost-effective, optimized materials for intermediate temperature SOFC interconnect and interconnect/electrode interface applications and identify and understand degradation processes in interconnects and at their interfaces with electrodes.

Yang, Z.G.; Maupin, G.; Simner, S.; Singh, P.; Stevenson, J.; Xia, G.

2005-01-27T23:59:59.000Z

118

Learn More About Interconnections  

Broader source: Energy.gov [DOE]

North America is comprised of two major and three minor alternating current (AC) power grids or interconnections. The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic...

119

The development of a high reliability auxiliary power system for a coal-fired cycling generating station  

SciTech Connect (OSTI)

An auxiliary system for a fossil generating station is evolved based on operating and reliability criteria including the capabilities of switchgear and standard auxiliary transformer impedances. These criteria are used to design a flexible and reliable auxiliary power system for a cyclic duty power generating station. The effect of mechanical equipment selection on the auxiliary power system design is discussed. An economic comparison of single voltage versus dual-voltage is made. A one-line diagram of the resulting proposed system is included.

Jackowski, M.; Bailey, M.

1983-06-01T23:59:59.000Z

120

EIS-0092: Conversion to Coal, Holyoke Water Power Company, Mt. Tom Generating Station Unit 1 Holyoke, Hampden County, Massachusetts  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to assess the environmental impacts of prohibiting Unit 1 of the Mt. Tom Generation Station Unit 1 from using either natural gas or petroleum products as a primary energy source, which would result in the utility burning low-sulfur coal.

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Plume opacity investigation at a stoker-fired power generating station  

SciTech Connect (OSTI)

A public utility contacted the Conoco Coal Research Division through Consolidation Coal Company and requested technical assistance in determining the cause of a high plume opacity at one of their stoker-fired power generating stations. The sporadic occurrence of a high opacity plume (>20%) had been reported for several years. Although the utility was burning low sulfur coal, sulfuric acid mist had been suspected as the cause of the plume opacity; therefore, anhydrous ammonia had been injected into the flue gas at the ESP inlet plenums to control the plume opacity with some degree of success. However, for the last two years, the high plume opacity has occurred more frequently. The possible causes of the high plume opacity investigated were: 1) organic species emissions, 2) particulate mass loading, 3) particle size distribution, and 4) sulfuric acid emissions. The investigation included detailed sampling inside the boiler, stack, and plume areas. It was determined that the major cause of the high plume opacity was submicron particle growth at the stack exit due to sulfuric acid/water condensation. The larger particles more efficiently scattered light which resulted in the visible plume at the stack exit. The organic emissions and particulate mass loading in the stack flue gas had minimal effect on the high plume opacity. The fly ash size distribution would also have had minimal effect if the sulfuric acid had not been present.

Lewis, G.H.

1987-01-01T23:59:59.000Z

122

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bioenergy Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kansas Program Type Interconnection Provider Kansas Corporation Commission Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing interconnection guidelines and net metering for customer-owned generators. Net metering and the accompanying interconnection guidelines apply to systems that generate electricity using solar, wind, methane, biomass or hydro resources, and to fuel cells using hydrogen produced by an eligible renewable technology, with a rated capacity of 25 kilowatts (kW) or less for residential customers, 200 kW or less for non-residential customers and 1.5 megawatts

123

Puerto Rico - Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Autoridad de Energía Electrica de Puerto Rico In 2007, the Autoridad de Energía Electrica de Puerto Rico (PREPA*) adopted interconnection standards based on the standard contained in the federal Energy Policy Act of 2005. PREPA promulgated interconnection rules in August 2008 that apply to all distributed generation (DG) projects that

124

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION  

SciTech Connect (OSTI)

During the period January 1, 2001-March 31, 2001, Allegheny Energy Supply Co., LLC (Allegheny) finalized the engineering of the Willow Island cofiring project, completed the fuel characterizations for both the Willow Island and Albright Generating Station projects, and initiated construction of both projects. Allegheny and its contractor, Foster Wheeler, selected appropriate fuel blends and issued purchase orders for all processing and mechanical equipment to be installed at both sites. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The third quarter of the project involved completing the detailed designs for the Willow Island Designer Fuel project. It also included complete characterization of the coal and biomass fuels being burned, focusing upon the following characteristics: proximate and ultimate analysis; higher heating value; carbon 13 nuclear magnetic resonance testing for aromaticity, number of aromatic carbons per cluster, and the structural characteristics of oxygen in the fuel; drop tube reactor testing for high temperature devolatilization kinetics and generation of fuel chars; thermogravimetric analyses (TGA) for char oxidation kinetics; and related testing. The construction at both sites commenced during this quarter, and was largely completed at the Albright Generating Station site.

K. Payette; D. Tillman

2001-04-01T23:59:59.000Z

125

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Louisiana Program Type Interconnection Provider Louisiana Public Service Commission '''''Note: Ongoing proceedings related to net metering can be found in [http://lpscstar.louisiana.gov/star/portal/lpsc/page/Dockets/portal.aspx Docket R-31417.]''''' The Louisiana Public Service Commission (PSC) adopted rules for net metering and interconnection in November 2005. Louisiana's rules, based on those in place in Arkansas, require publicly-owned utilities and rural electric cooperatives to offer net metering to customers with systems that generate electricity using solar, wind, hydropower, geothermal or biomass

126

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

General Public/Consumer General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Arkansas Program Type Interconnection Provider Arkansas Public Service Commission In April 2001, Arkansas enacted legislation directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems. The Arkansas Public Service Commission (PSC) adopted net-metering rules in July 2002 (Order No. 02-046-R). Section 3 applies to the interconnection of net-metered facilities to existing electric power systems.* Systems that generate electricity using solar, wind, hydro, geothermal and biomass resources are eligible to interconnect

127

Western Interconnection Synchrophasor Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a type of...

128

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION  

SciTech Connect (OSTI)

During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker.

K. Payette; D. Tillman

2001-01-01T23:59:59.000Z

129

Recommended practice for fire protection for electric generating plants and high voltage direct current converter stations. 2005 ed.  

SciTech Connect (OSTI)

The standard outlines fire safety recommendations for gas, oil, coal, and alternative fuel electric generating plants including high voltage direct current converter stations and combustion turbine units greater than 7500 hp used for electric generation. Provisions apply to both new and existing plants. The document provides fire prevention and fire protection recommendations for the: safety of construction and operating personnel; physical integrity of plant components; and continuity of plant operations. The 2005 edition includes revisions and new art that clarify existing provisions. 5 annexes.

NONE

2005-07-01T23:59:59.000Z

130

Distributed Generation and Grid Interconnection  

Science Journals Connector (OSTI)

Thus far we have considered point compensation and the correction of the voltage or current at a particular location in the network. This chapter considers the voltage profile of lines with distributed loads a...

Arindam Ghosh; Gerard Ledwich

2002-01-01T23:59:59.000Z

131

Updating Technical Screens for PV Interconnection: Preprint  

SciTech Connect (OSTI)

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

2012-08-01T23:59:59.000Z

132

Abundance and distribution of macro-crustaceans in the intake and discharge areas before and during early operation of the Cedar Bayou Generating Station  

E-Print Network [OSTI]

at Stations 4 and 5 varied from 3. 0 to 4. 0 m. The substrate at these two stations was silt and clay, with a very high content of organic debris. Trinity Bay, Discharge Area Each of shoreline Stations 6, 9, 19, 21, and 24 were located at 1610 m (I mile...ABUNDANCE AND DISTRIBUTION OF MACRO-CRUSTACEANS IN THE INTAKE AND DISCHARGE AREAS BEFORE AND DURING EARLY OPERATION OF THE CEDAR BAYOU GENERATING STATION A Thesis by MONROE SCHMIDT Submitted to the Graduate College of Texas A&M University...

Schmidt, Monroe

1972-01-01T23:59:59.000Z

133

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Georgia Program Type Interconnection Provider Georgia Public Service Commission The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells up to 10 kilowatts (kW) in capacity, and commercial facilities up to 100 kW, to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year. Interconnected customers must comply with all relevant national standards,

134

Analysis of ground motions at San Onofre Nuclear Generating Station April 9, 1968  

Science Journals Connector (OSTI)

...concrete mat foundation. The turbine generator, the plant auxiliary...transferred to the secondary turbine steam system by the steam generators...has resulted in a bothersome maintenance problem which requires replacement...self-sustMned Wineharger wind-generator to charge the batteries...

G. W. Housner; P. J. West; C. G. Johnson

135

Interconnect Issues in NE  

Broader source: Energy.gov [DOE]

Presentation covers interconnect issues in the Northeast and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

136

Perforation patterned electrical interconnects  

DOE Patents [OSTI]

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

Frey, Jonathan

2014-01-28T23:59:59.000Z

137

North American Electric Reliability Corporation Interconnections...  

Broader source: Energy.gov (indexed) [DOE]

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

138

World's First Tri-Generation Fuel Cell and Hydrogen Fueling Station...  

Office of Environmental Management (EM)

to heat and electricity-in Fountain Valley. The system runs on natural gas and biogas generated by the Orange County Sanitation District's wastewater treatment facility....

139

Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Workshop  

SciTech Connect (OSTI)

Pacific Northwest Laboratory (PNL) evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume II, reports the results of an industry-wide workshop held on May 28 and 29, 1986, to discuss the technical issues associated with aging of nuclear service emergency diesel generators. The technical issues discussed most extensively were: man/machine interfaces, component interfaces, thermal gradients of startup and cooldown and the need for an accurate industry database for trend analysis of the diesel generator system.

Hoopingarner, K.R.; Vause, J.W.

1987-08-01T23:59:59.000Z

140

E-Print Network 3.0 - albright generating station Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

cooling... and generator lube oil systems, (4) a 0.3 mile undergrounded transmission line from the project to ... Source: California Energy Commission Collection: Energy...

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Voltage Collapse SimulationVoltage Collapse Simulation (Eastern Interconnection(Eastern Interconnection  

E-Print Network [OSTI]

of 2003 that is available on the PSERC web site, http://pserc.org. 2 #12;Symbols in the Simulation Window · Buses: heavy dark lines where the generators, loads and transmission lines interconnect · Transmission

142

Solar cell array interconnects  

DOE Patents [OSTI]

Electrical interconnects are disclosed for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb-Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb-Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value. 4 figs.

Carey, P.G.; Thompson, J.B.; Colella, N.J.; Williams, K.A.

1995-11-14T23:59:59.000Z

143

Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study  

SciTech Connect (OSTI)

Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators.

Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

1987-08-01T23:59:59.000Z

144

Propagation of the low-frequency noise generated by power station water-cooling towers  

Science Journals Connector (OSTI)

The propagation of low-frequency noise generated by air turbulent motion in water-cooling towers is investigated by the use of geometrical acoustics of moving media. It is shown that a cooling tower plum acts ...

Sergei P. Fisenko

1997-01-01T23:59:59.000Z

145

RidgenoseSolarInterconnectionProject  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cliffrose Solar Energy Interconnection Project DOEEA-1989 Western Area Power Administration (Western) is responding to a request from Longview Solar, LLC, to interconnect their...

146

Distribution, relative abundance and species composition of shrimp, crabs and fish in the intake area, discharge canal and cooling lake of the Cedar Bayou generating station, Baytown, Texas  

E-Print Network [OSTI]

area and discharge waters of Houston Lighting S Power Company's Cedar Bayou Generating Station, Baytown, Texas. Hydrological data were taken at each sampling station. A total of 12 species of crustaceans and 53 species of fish was captured. The 10... juvenile stages risk entrainment through the plant (Mihursky and Kennedy 1967; Bascom 1974) or impingement on the intake screens. As Landry (1977) found, the impact of either entrainment or impingement depends mainly on the season of recruitment...

St. Clair, Lou Ann

2012-06-07T23:59:59.000Z

147

Micro-fluidic interconnect  

SciTech Connect (OSTI)

An apparatus for simultaneously aligning and interconnecting microfluidic ports is presented. Such interconnections are required to utilize microfluidic devices fabricated in Micro-Electromechanical-Systems (MEMS) technologies, that have multiple fluidic access ports (e.g. 100 micron diameter) within a small footprint, (e.g. 3 mm.times.6 mm). Fanout of the small ports of a microfluidic device to a larger diameter (e.g. 500 microns) facilitates packaging and interconnection of the microfluidic device to printed wiring boards, electronics packages, fluidic manifolds etc.

Okandan, Murat (Albuquerque, NM); Galambos, Paul C. (Albuquerque, NM); Benavides, Gilbert L. (Los Ranchos, NM); Hetherington, Dale L. (Albuquerque, NM)

2006-02-28T23:59:59.000Z

148

US EPA Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites October 2007  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R-08/023 R-08/023 October 2007 Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites By: Gail Mosey, Donna Heimiller, Douglas Dahle, Laura Vimmerstedt, and Liz Brady-Sabeff National Renewable Energy Laboratory 1617 Cole Blvd. Golden, CO 80401 Under Contract No. DE-AC36-99-GO10337 Through EPA IAG NO. DW89930254010 NREL/TP-640-41522 For: George Huffman, EPA Project Manager Sustainable Technology Division National Risk Management Research Laboratory U.S. Environmental Protection Agency Cincinnati, Ohio 45268 National Risk Management Research Laboratory Office of Research and Development U.S. Environmental Protection Agency Cincinnati, Ohio 45268 Notice The U.S. Environmental Protection Agency through its Office of Research and Development

149

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

150

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

151

interconnect | OpenEI  

Open Energy Info (EERE)

interconnect interconnect Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago) Keywords buildings carbon dioxide emissions carbon footprinting CO2 commercial buildings electricity emission factors ERCOT hourly emission factors interconnect nitrogen oxides NOx

152

EIS-0036: Coal Conversion Program, New England Power Company, Brayton Point Generating Station Plants 1, 2 and 3, Sommerset, Bristol County, Massachusetts  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration developed this EIS to evaluate the site-specific environmental impacts of issuing a Notice of Effectiveness to New England Power Company's Brayton Point Generating Station, Units 1, 2 and 3 to prohibit burning of gas or oil as the primary source of fuel.

153

EIS-0086: Conversion to Coal, New England Power Company, Salem Harbor Generating Station Units 1, 2, and 3 Salem, Essex County, Massachusetts  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to assess the environmental impacts of prohibiting Units I, 2, and 3 of the Salem Harbor Generating Station from using either natural gas or petroleum products as a primary energy source, which would result in the utility burning low-sulfur coal.

154

EIS-0105: Conversion to Coal, Baltimore Gas & Electric Company, Brandon Shores Generating Station Units 1 and 2, Anne Arundel County, Maryland  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Economic Regulatory Administration Office of Fuels Program, Coal and Electricity Division prepared this statement to assess the potential environmental and socioeconomic impacts associated with prohibiting the use of petroleum products as a primary energy source for Units 1 and 2 of the Brandon Shores Generating Station, located in Anne Arundel County, Maryland.

155

Central American electrical interconnection  

SciTech Connect (OSTI)

A technical cooperation grant of $2.25 million, designed to strengthen the capacity of Central American countries to operate their regional interconnected electrical system, was announced by the Inter-American Development Bank (IDB). The grant, extended from the banks Fund for Special Operations, will help improve the capacity of the regions electric power companies to achieve economical, safe operation of the interconnected electric power systems. The funds will also be used to finance regional studies of the accords, procedures, regulations, and supervisory mechanisms for the system, as well as program development and data bases.

Not Available

1988-12-01T23:59:59.000Z

156

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Kentucky Program Type Interconnection Provider Kentucky Public Service Commission In April 2008, Kentucky enacted legislation which required the Kentucky Public Service Commission (PSC) to develop interconnection and net metering guidelines for all retail electric suppliers operating in Kentucky (excluding TVA utilities). The Kentucky PSC adopted those guidelines on January 8, 2009 (Order 2008-00169). The PSC's rules set forth a two-tiered approach to simplify the interconnection process:

157

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New York Program Type Interconnection Provider New York State Department of Public Service New York first adopted uniform interconnection standards in 1999 (see history below). The Standard Interconnection Requirements (SIR) have subsequently been amended several times since, most recently with the adoption of far reaching revisions in February 2009. Several more minor

158

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Connecticut Program Type Interconnection Provider Public Utilities Regulatory Authority In December 2007, the Connecticut Department of Public Utility Control (DPUC) now called the Public Utilities Regulatory Authority (PURA) approved new interconnection guidelines for distributed energy systems up to 20 megawatts (MW) in capacity. Connecticut's interconnection guidelines apply to the state's two investor-owned utilities -- Connecticut Light and Power

159

Interconnection Guidelines | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Energy Sources Solar Wind Program Info State Delaware Program Type Interconnection Provider Delaware Public Service Commission '''''Note: Delaware law ([http://delcode.delaware.gov/title26/c010/index.shtml#1014 26 Del. C. § 1014]) requires the Delaware Public Service Commission (PSC), Delaware Electric Cooperative (DEC), and municipal utilities to develop interconnection rules using as a guide the Interstate Renewable Energy Council's (IREC) model interconnection rules and the U.S. Department of

160

VLSI interconnect Avinoam Kolodny  

E-Print Network [OSTI]

1000 10000 100000 Length [um] Power Local total Global total TOTAL globallocal Power Distribution by Wirelength · Total Dynamic Power · Global clock ­ not included · Local signals nets = 66% · Global signals global signals Total dynamic power (Gate, Diffusion and Interconnect) local clock global signals global

Kolodny, Avinoam

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Reversible concentric ring microfluidic interconnects  

E-Print Network [OSTI]

A reversible, Chip-to-Chip microfluidic interconnect was designed for use in high temperature, high pressure applications such as chemical microreactor systems. The interconnect uses two sets of concentric, interlocking ...

Thompson, Mary Kathryn, 1980-

2004-01-01T23:59:59.000Z

162

Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |  

Broader source: Energy.gov (indexed) [DOE]

and Initial Comments of PJM Interconnection, and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc electric transmission facilities at the Michigan-Ontario border. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of

163

Microsoft Word - CX-Hardeson_Interconnection_23Sept2013.doc  

Broader source: Energy.gov (indexed) [DOE]

request. The proposed point of interconnection is at SnoPUD's existing Hardeson Substation. In order to integrate the proposed generation, BPA and SnoPUD would enter into...

164

Chemical looping combustion of coal in interconnected fluidized beds  

Science Journals Connector (OSTI)

Chemical looping combustion is the indirect combustion by use of oxygen carrier. It can...2...capture in power generating processes. In this paper, chemical looping combustion of coal in interconnected fluidized ...

LaiHong Shen; Min Zheng; Jun Xiao; Hui Zhang

2007-04-01T23:59:59.000Z

165

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

166

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State New Jersey Program Type Interconnection Provider New Jersey Board of Public Utilities New Jersey's interconnection standards apply statewide to all electric distribution utilities, but not to the small number of municipal utilities and electric cooperatives in the state. The rules, first adopted in 2001, have been revised several times since their inception, most recently in May 2012. The current standards include the following basic provisions:

167

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Colorado Program Type Interconnection Provider Colorado Public Utilities Commission In December 2005, the Colorado Public Utilities Commission (PUC) adopted standards for net metering and interconnection, as required by Amendment 37, a renewable-energy ballot initiative approved by Colorado voters in November 2004. The PUC standards generally apply to utilities with 40,000 or more customers and all cooperative utilities.*

168

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Home Weatherization Wind Program Info State Florida Program Type Interconnection Provider Florida Public Service Commission In March 2008, the Florida Public Service Commission (PSC) adopted interconnection rules for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply only to the state's investor-owned utilities; the rules do not apply to electric cooperatives or municipal

169

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Minnesota Program Type Interconnection Provider Minnesota Public Utilities Commission Minnesota's net-metering law, enacted in 1983, applies to all investor-owned utilities, municipal utilities and rural electric cooperatives. Qualifying facilities of less than 1,000 kilowatts (kW) are eligible for net metering. However, uniform interconnection regulations were not implemented when net metering was established.

170

Solid radioactive waste management facility design for managing CANDU{sup R} 600 MW nuclear generating station re-tube/refurbishment Waste Streams  

SciTech Connect (OSTI)

The main design features of the re-tube canisters, waste handling equipment and waste containers designed by Atomic Energy of Canada Limited (AECL{sup R}) and implemented in support of the re-tube/refurbishment activities for Candu 600 MW nuclear generating stations are described in this paper. The re-tube/refurbishment waste characterization and the waste management principles, which form the basis of the design activities, are also briefly outlined. (authors)

Pontikakis, N.; Hopkins, J.; Scott, D.; Bajaj, V.; Nosella, L. [AECL, 2251 Speakman Drive, Mississauga, Ontario, L5K 1B2 (Canada)

2007-07-01T23:59:59.000Z

171

Utility Wind Integration Group Distributed Wind/Solar Interconnection  

Broader source: Energy.gov (indexed) [DOE]

Utility Wind Integration Group Distributed Wind/Solar Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop May 21, 2013 8:00AM MDT to May 22, 2013 5:00PM MDT Golden, Colorado This two-day workshop will answer your questions about interconnecting wind and solar plants and other distributed generation applications to electric distribution systems while providing insight on integrating large-scale renewable generation into the transmission system. Held at the National Renewable Energy Laboratory's (NREL) state-of-the-art Energy Systems Integration Facility (ESIF) on the first day and at the Western Area Power Administration's Electric Power Training Center (EPTC) on the second day, the workshop will provide an overview of wind and solar interconnection

172

USLCI Interconnect Region Electricity datasets, 2008 | OpenEI  

Open Energy Info (EERE)

76 76 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278976 Varnish cache server USLCI Interconnect Region Electricity datasets, 2008 Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included.Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year 2008 mix of fuels used for utility generations for each of the interconnect regions and is based on the EIA electricity reports for all power plants in the US. Detailed information on the methodology is included in the module report and detailed spreadsheet.

173

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid  

SciTech Connect (OSTI)

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

Kou, Gefei [ORNL; Hadley, Stanton W [ORNL; Markham, Penn N [ORNL; Liu, Yilu [ORNL

2013-12-01T23:59:59.000Z

174

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New Mexico Program Type Interconnection Provider New Mexico Public Regulation Commission Interconnection in New Mexico is governed by New Mexico Public Regulation Commission (PRC) Rule 568 and Rule 569. These rules, adopted in July 2008, revised and clarified the state's existing rules. Rule 569 applies to all qualifying facilities (QFs) under PURPA, which generally includes all renewable-energy systems and combined-heat-and-power (CHP) systems up to 80

175

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Ohio Program Type Interconnection Provider Ohio Public Utilities Commission '''''Note: In July 2012, the Public Utilities Commission of Ohio (PUCO) opened a docket ([http://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=12-2051&x=0&y=0 Case 12-0251-EL-ORD]) to review the net metering and interconnection rules for investor-owned utilities. Details will be posted as more information is available.'''''

176

interconnect region | OpenEI  

Open Energy Info (EERE)

interconnect region interconnect region Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

177

Webinar: Understanding the Interconnection and Transmission Service Queues  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Understanding the Interconnection and Transmission Service Webinar: Understanding the Interconnection and Transmission Service Queues Webinar: Understanding the Interconnection and Transmission Service Queues March 5, 2012 - 6:10pm Addthis This webinar will take place March 28, 2012, from 11 a.m.-12:30 p.m. MDT. Hosted by the U.S. Department of Energy's (DOE's) Office of Indian Energy Policy and Programs, DOE's Tribal Energy Program, the Environmental Protection Agency (EPA), and the Western Area Power Administration, this Web seminar will answer the following questions: What is the large generator interconnection procedure? How is transmission service requested? What does this mean for Tribes interested in gaining access to the transmission system? This is the fifth in a series of webinars that will run through September 2012.

178

Next Generation Fast RF Interlock Module and ATCA Adapter for ILC High Availability RF Test Station Demonstration  

SciTech Connect (OSTI)

High availability interlocks and controls are required for the ILC (International Linear Collider) L-Band high power RF stations. A new F3 (Fast Fault Finder) VME module has been developed to process both fast and slow interlocks using FPGA logic to detect the interlock trip excursions. This combination eliminates the need for separate PLC (Programmable Logic Controller) control of slow interlocks. Modules are chained together to accommodate as many inputs as needed. In the next phase of development the F3's will be ported to the new industry standard ATCA (Advanced Telecom Computing Architecture) crate (shelf) via a specially designed VME adapter module with IPMI (Intelligent Platform Management Interface). The goal is to demonstrate auto-failover and hot-swap for future partially redundant systems.

Larsen, R

2009-10-17T23:59:59.000Z

179

Seismic stations  

Science Journals Connector (OSTI)

In the previous chapters, the equipment used for seismic stations has been described. When putting this equipment out in the field, we have a seismic station. Unfortunately it is not as simple as just putting ...

Jens Havskov; Gerardo Alguacil

2004-01-01T23:59:59.000Z

180

Optically Interconnected MulticomputersUsing  

E-Print Network [OSTI]

Optically Interconnected MulticomputersUsing Inverted-GraphTopologies Tosuccessfullyexploitthebenefitsofopticaltechnologyinatightlycoupledmulticomputer, the architecturaldesignmust reflectboth the advantages and limitationsof optics. This article systems. Although optics have con- tributed dramatically to long-distance communi- cation and more

Krchnavek, Robert R.

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State California Program Type Interconnection Provider California Public Utilities Commission '''''Note: The California Public Utilities Commission (CPUC) approved a [http://docs.cpuc.ca.gov/EFILE/MOTION/162852.PDF proposed settlement] in September 2012, enacting the first fundamental redesign of Rule 21 since 2000. The complete revised Rule 21 Tariff, as described at a high level below, can be found beginning on page 136 of CPUC Decision 12-09-018. The individual tariffs adopted by the utilities can be found on the CPUC web

182

Interconnection Standards (Utah  

Open Energy Info (EERE)

and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind energy, hydropower, hydrogen, biomass, landfill gas,...

183

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION and Anitha Rednam, Comparative Costs of California Central Station Electricity Generation Technologies Manager Ruben Tavares - Acting Manager ELECTRICITY ANALYSIS OFFICE Sylvia Bender Deputy Director

Laughlin, Robert B.

184

CAD implications of new interconnect technologies  

Science Journals Connector (OSTI)

This paper looks at the CAD implications of possible new interconnect technologies. We consider three technologies in particular: three dimensional ICs, carbon nanotubes as a replacement for metal interconnects, and optical interconnections for longer ... Keywords: 3D interconnect, On-chip optical, nanotubes

Louis K. Scheffer

2007-06-01T23:59:59.000Z

185

EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

34: Hualapai Valley Solar Interconnection Project, Arizona 34: Hualapai Valley Solar Interconnection Project, Arizona EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona Overview Hualapai Valley Solar, LLC, proposes to construct, operate and maintain a 340-megawatt, solar-powered generating facility in Mohave County, near Kingman, Ariz. The proposed project would use concentrating solar-power-trough technology to capture the sun's heat to make steam, which would power a traditional steam turbine generator. Proposed infrastructure would consist of a solar field, power block, thermal energy storage system, substation site, transmission line, temporary laydown areas and other ancillary facilities. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

186

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

187

Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)  

SciTech Connect (OSTI)

Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperwork required of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.

Tweedie, A.; Doris, E.

2011-07-01T23:59:59.000Z

188

EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town  

Broader source: Energy.gov (indexed) [DOE]

84: Invenergy Interconnection for the Wray Wind Energy 84: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO Summary DOE's Western Area Power Administration prepared this EA to evaluate the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's existing Wray Substation in Yuma County, Colorado. Public Comment Opportunities None available at this time. Documents Available for Download December 27, 2012 EA-1884: Finding of No Significant Impact Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO December 27, 2012 EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray,

189

Learn More About Interconnections | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Learn More About Learn More About Interconnections Learn More About Interconnections Learn More About Interconnections EASTERN INTERCONNECTION North America is comprised of two major and three minor alternating current (AC) power grids or "interconnections." The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic coast (excluding Québec), South to Florida and West to the foot of the Rockies (excluding most of Texas). All of the electric utilities in the Eastern Interconnection are electrically tied together during normal system conditions and operate at a synchronized frequency operating at an average of 60Hz. Click here for more information. DOE is in the process of issuing awards to two entities in the Eastern Interconnection: one to the Eastern Interconnection Planning

190

Temporal and spatial distribution of fishes in the upper Galveston Bay System with particular reference to the cooling water system of Cedar Bayou Generating Station  

E-Print Network [OSTI]

Salinity Temperature. Summary- Temperature and Salinity Influence. PH Dissolved Oxygen TREATMENT OF THE BIOLOGICAL DATA. Cluster Analysis Reduction, . Transformation and Standardization. Interpretation of Analysis 18 18 19 21 21 37 50 52... salinity at each station, monthly mean for all stations, and annual mean for each Trinity Bay offshore station before plant operation from November 1969 through November 1970. Page 23 Monthly mean bottom salinity at each station, monthly mean for all...

Holt, Scott Allen

2012-06-07T23:59:59.000Z

191

Interconnection Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Industrial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State West Virginia Program Type Interconnection Provider West Virginia Public Service Commission In 2006, West Virginia stakeholders came together to consider net metering, interconnection as required by the Federal Energy Policy Act (2005) and agreed upon a "Statement of Consensus Among Parties," which was presented to and accepted by the West Virginia Public Service Commission (PSC) in December 2006. The consensus agreement did include interconnection guidelines for the state, however, the PSC did not initiate a formal rule-making or incorporate the guidelines into agency rules. Rather, the

192

GSA-Utility Interconnection Agreements  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception - B-197583, January 19, 1981 GSA - Utility Interconnection Agreements

193

Interconnection Guidelines (Rhode Island) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Rhode Island Program Type Interconnection Provider Rhode Island Public Utilities Commission Rhode Island enacted legislation (HB 6222) in June 2011 to standardize the application process for the interconnection of customer-sited renewable-energy systems to the state's distribution grid. Rhode Island's interconnection policy is not nearly as comprehensive as

194

High-temperature quenching of electrical resistance in graphene interconnects  

E-Print Network [OSTI]

into the chip interconnect design the materials with low electrical resistance and high thermal con- ductivity dependence of the resistance were explained by the thermal generation of the electron-hole pairs and carrier, increased total thermal boundary resistance of the chip layers, incorporation of the alternative dielectric

195

Long-Distance Interconnection as Solar Resource Intermittency Solution: Optimizing the Use of Energy Storage and the Geographic  

E-Print Network [OSTI]

of Energy Storage and the Geographic Dispersion + Interconnection of Solar Generating Facilities. Marc J. R energy targets. Variability of the solar resource occurs across many different temporal scales: from energy storage and Long-distance interconnection coupled with geographic dispersion of solar generating

196

New Report Characterizes Existing Offshore Wind Grid Interconnection...  

Office of Environmental Management (EM)

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities September 3,...

197

PJM Interconnection (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Interconnection PJM (originally Pennsylvania, Jersey, Maryland) Interconnection is a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. The PJM region has an area of 214,000 square miles, a population of about 60 million and a peak demand of 163,848 megawatts

198

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

199

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

200

Massachusetts Nuclear Profile - Pilgrim Nuclear Power Station  

U.S. Energy Information Administration (EIA) Indexed Site

Pilgrim Nuclear Power Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer cpacity factor (percent)","Type","Commercial operation date","License...

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Distributed PV Interconnection Screening Procedures and Online...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools" 30 mins. Q&Adiscussion Upcoming Meeting: September 24, 2014 Highlights of SunShot Projects: Interconnection as Part of a Strategic Resource Planning Process Alison...

202

Recent Development of SOFC Metallic Interconnect  

SciTech Connect (OSTI)

Interest in solid oxide fuel cells (SOFC) stems from their higher eciencies and lower levels of emitted pollu- tants, compared to traditional power production methods. Interconnects are a critical part in SOFC stacks, which connect cells in series electrically, and also separate air or oxygen at the cathode side from fuel at the anode side. Therefore, the requirements of interconnects are the most demanding, i:e:, to maintain high elec- trical conductivity, good stability in both reducing and oxidizing atmospheres, and close coecient of thermal expansion (CTE) match and good compatibility with other SOFC ceramic components. The paper reviewed the interconnect materials, and coatings for metallic interconnect materials.

Wu JW, Liu XB

2010-04-01T23:59:59.000Z

203

Updating Interconnection Screens for PV System Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abraham Ellis, Roger Hill Sandia National Laboratories Tom Key, Kristen Nicole, Jeff Smith Electric Power Research Institute Updating Interconnection Screens for PV System...

204

The abundance and distribution of macro-invertebrates in the cooling-water canal system of the P. H. Robinson Generating Station located on Galveston Bay, Texas, with emphasis on the effect of supplemental cooling towers  

E-Print Network [OSTI]

and Goodyear 1972; Raney et al. 1973; Belts et al. 1974). There is aslo increasing awareness and concern for other power plant related problems such as mechanical and pressure stress due to entrainment through the condenser tubes, impingement upon intake... to determine the abundance, distribution and survival rate of macro- invertebrates present in the cooling-water canal system of Houston Lighting 6 Power Company's P. H. Robinson Generating Station. Surface and bottom, day and night collections were taken...

Margraf, F. Joseph

2012-06-07T23:59:59.000Z

205

Species composition, distribution, and abundance of macrobenthic organisms in the intake and discharge area of a steam-electric generating station before and during initial start-up  

E-Print Network [OSTI]

was used at 17 stations with soft substrates. A frame sampler was used at five stations with hard substrates, Each gear was used every 4 weeks, but alternately; with a 2-week-time interval between use of the dredge and frame. Data yielded by dif- ferent.... Mid-Bay was the second most produc- tive, followed by Tabb's Bay and Cedar Bayou which both yielded low numbers of species and individuals. Factors thought to cause these differences were: 1. the degree of pollution in each area, 2. the type...

Williams, Grady Edward

2012-06-07T23:59:59.000Z

206

Durability of Metallic Interconnects and Protective Coatings  

SciTech Connect (OSTI)

To build up a useful voltage, a number of solid oxide fuel cells (SOFCs) are electrically connected into series in a stack via interconnects, which are placed between adjacent cells. In addition to functioning as a bi-polar electrical connector, the interconnect also acts as a separator plate that separates the fuel at the anode side of one cell from the air at the cathode side on an adjacent cell. During SOFC operation at the high temperatures, the interconnects are thus simultaneously exposed to the oxidizing air at one side and a reducing fuel that can be either hydrogen or hydrocarbon at the other. Besides, they are in contact with adjacent components, such as electrodes or electrical contacts, seals, etc. With steady reduction in SOFC operating temperatures into the low or intermediate range 600-850oC, oxidation resistant alloys are often used to construct interconnects. However, the metallic interconnects may degrade via interactions at their interfaces with surrounding environments or adjacent components, potentially affecting the stability and performance of interconnects and the SOFC stacks. Thus protection layers are applied to metallic interconnects that also intend to mitigate or prevent chromium migration into cells and the cell poisoning. This chapter provides a comprehensive review of materials for metallic interconnects, their degradation and coating protection.

Yang, Zhenguo; Stevenson, Jeffry W.

2009-12-15T23:59:59.000Z

207

FPGA Interconnect Delay Fault Testing Erik Chmelar  

E-Print Network [OSTI]

A satisfactory FPGA testing method meets several crite- ria. First, the routing resources must be explicitlyFPGA Interconnect Delay Fault Testing Erik Chmelar Center for Reliable Computing Stanford is a scalable manufactur- ing test method for all SRAM-based FPGAs, able to detect multiple interconnect delay

Stanford University

208

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

209

Distributed Generation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Untapped Value of Backup Generation Untapped Value of Backup Generation While new guidelines and regulations such as IEEE (Institute of Electrical and Electronics Engineers) 1547 have come a long way in addressing interconnection standards for distributed generation, utilities have largely overlooked the untapped potential of these resources. Under certain conditions, these units (primarily backup generators) represent a significant source of power that can deliver utility services at lower costs than traditional centralized solutions. These backup generators exist today in large numbers and provide utilities with another option to reduce peak load, relieve transmission congestion, and improve power reliability. Backup generation is widely deployed across the United States. Carnegie Mellon's Electricity

210

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

211

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave...  

Broader source: Energy.gov (indexed) [DOE]

EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona EA-1989: Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona SUMMARY DOE's...

212

Power Consumption and Scalability of Optically Switched Interconnects  

Science Journals Connector (OSTI)

We analyzed three realizations of optically switched interconnects regarding power consumption and scalability. The optically switched interconnects provide higher power efficiency...

Fehratovic, Naida; Aleksic, Slavisa

213

New_Contractor_Information_for_Interconnection_Security_Agreement...  

Broader source: Energy.gov (indexed) [DOE]

NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforIntercon...

214

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt...  

Energy Savers [EERE]

Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska SUMMARY DOE's Western Area...

215

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona SUMMARY DOE's...

216

CONSULTANT REPORT DISTRIBUTED GENERATION  

E-Print Network [OSTI]

Energy Jobs Plan, Governor Brown established a 2020 goal of 12,000 megawatts of localized renewable energy development, or distributed generation, in California. In May 2012, Southern California Edison, renewables, interconnection, integration, electricity, distribution, transmission, costs. Please use

217

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

218

Impacts of distributed generation on Smart Grid.  

E-Print Network [OSTI]

??With the concept of Smart Grid, there are high possibilities that the interconnection of distributed generation issues can be solved and minimised. This thesis discusses (more)

Hidayatullah, Nur Asyik

2011-01-01T23:59:59.000Z

219

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

220

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343)  

SciTech Connect (OSTI)

The COB Energy Facility would be constructed on a site near the rural community of Bonanza, in Klamath County, Oregon. Generating components of the project would be constructed in either one or two phases, including four air-cooled combustion turbine generators fueled with natural gas, four heat recovery steam generators, and two steam turbines. Additional facilities include a new 7.2-mile-long 500-kV transmission line, a new 4.1-mile-long natural gas pipeline, a 2.8-mile-long water pipeline, a 20-acre wastewater evaporation pond or a 3,770-foot-long irrigation pipeline to deliver wastewater to a 31-acre pasture, a 4.7-acre stormwater infiltration basin, a 1.5-acre stormwater retention pond, and various tanks, buildings, exhaust stacks, parking, and storage areas. Natural gas to fuel the combustion turbines would be supplied by way of a new 4.1-mile-long, 20-inch-diameter pipeline from a Gas Transmission Northwest's Bonanza Compressor Station. The new pipeline would be constructed within private easements adjacent to or near Klamath County road rights-of-way. Although COB Energy Facility generators would use air-cooled condensers, the project would use an average of 72 gallons per minute for steam production and station service, up to a maximum of 210 gallons per minute. The source of this water would be one existing and two new wells near the project site, drawing from a deep aquifer consistent with a State of Oregon water right permit expected to be incorporated into the State energy facility site certificate. Process wastewater would either be used to irrigate pasture or held in a lined pond to evaporate. Sanitary water would be routed to an onsite septic tank then discharged to a leach field. No wastewater would be discharged to surface waters. The COB Energy Facility would interconnect to the FCRTS at Captain Jack Substation, 7.2 miles south of the project site. PERC would construct a new 500-kV transmission line from the project site to Captain Jack Substation. Part of the transmission line would cross public land managed by the Bureau of Land Management. BPA would install additional electrical equipment at Captain Jack Substation. At this time, PERC has not requested specific points of delivery.

N /A

2004-08-20T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

PJM Interconnection, LLC | Open Energy Information  

Open Energy Info (EERE)

PA References: SGIC1 This article is a stub. You can help OpenEI by expanding it. PJM Interconnection, LLC Smart Grid Project was awarded 13,698,091 Recovery Act Funding...

222

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network [OSTI]

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

223

NREL Variability Analysis for the Western Interconnect (Presentation)  

SciTech Connect (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

224

Accelerating Fatigue Testing for Cu Ribbon Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation describes fatigue experiments and discusses dynamic mechanical loading for Cu ribbon interconnects.

Bosco, N.; Silverman, T.; Wohlgemuth , J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shioda, T.; Zenkoh, H.; Miyashita, M.; Tadanori, T.; Suzuki, S.

2013-05-01T23:59:59.000Z

225

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

226

Committed regional electrical interconnection projects in the Middle East  

SciTech Connect (OSTI)

Due to the well-known advantages of electrical interconnections and their consequent benefits, Jordan considers the interconnection of its electrical network with the neighboring electrical networks as one of its main corporate strategies. At present the electrical interconnection project of the networks of Egypt, Iraq, Jordan, Syria, and Turkey is progressing. To achieve this interconnection project, two feasibility studies were conducted: interconnection of the Egyptian and Jordanian electrical power systems; interconnection of the electrical networks of Egypt, Iraq, Jordan, Syria, and Turkey (EIJST interconnection). This presentation reviews these studies and their results.

Azzam, M.; Al-Said, A.

1994-12-01T23:59:59.000Z

227

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

228

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

229

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

230

Interconnecting PV on New York City's Secondary Network Distribution System  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ???¢????????networks???¢??????? in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1???¢????????PV Deployment Analysis for New York City???¢????????we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2???¢????????A Briefing for Policy Makers on Connecting PV to a Network Grid???¢????????presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3???¢????????Technical Review of Concerns and Solutions to PV Interconnection in New Y

K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

2009-11-30T23:59:59.000Z

231

Production process for advanced space satellite system cables/interconnects.  

SciTech Connect (OSTI)

This production process was generated for the satellite system program cables/interconnects group, which in essences had no well defined production process. The driver for the development of a formalized process was based on the set backs, problem areas, challenges, and need improvements faced from within the program at Sandia National Laboratories. In addition, the formal production process was developed from the Master's program of Engineering Management for New Mexico Institute of Mining and Technology in Socorro New Mexico and submitted as a thesis to meet the institute's graduating requirements.

Mendoza, Luis A.

2007-12-01T23:59:59.000Z

232

An integrated computer-based training simulator for the operative personnel of the 800-MW power-generating unit at the Perm District Power Station  

Science Journals Connector (OSTI)

The integrated computer-based training simulator for an 800-MW power-generating unit is described. Its capacities for training the personnel of the boiler-turbine and chemical departments are shown.

N. Yu. Pevneva; V. N. Piskov; A. N. Zenkov

2007-07-01T23:59:59.000Z

233

A G LO BA L P OW E R TECHNOLO GIES CO M PA N Y SolarTieTM Grid Interconnection Solution  

E-Print Network [OSTI]

G f· Shipments to date sufficient to power 10 GW of wind power SWind Plant Interconnection Solutions's Wind-Generated Electricity "Powered by AMSC®" Wind Turbine Designs, Controls & Converters · Relied upon utilized at more than 70 wind plants worldwide · Shipments to date sufficient to allow interconnection 4 p

Homes, Christopher C.

234

Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.  

SciTech Connect (OSTI)

Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

2012-02-01T23:59:59.000Z

235

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or  

E-Print Network [OSTI]

WHAT IS A NETWORK? (Gas and Electricity) A complex, interconnected group or system Electricity and Gas: A system used to distribute electricity and gas around the world/certain area, by compromising to minimise costs and generate the most electricity and gas as possible, which maximises profits

Wright, Francis

236

Regulation and investment under uncertainty: An application to power grid interconnection  

E-Print Network [OSTI]

An Application to Power Grid Interconnection. Jean-Danielto the Ontario power grid. This interconnection will allowfor our application to a power grid interconnection. Second,

Saphores, Jean-Daniel M; Gravel, E; Bernard, J T

2004-01-01T23:59:59.000Z

237

Original Paper Fully interconnected, linear control  

E-Print Network [OSTI]

Original Paper Fully interconnected, linear control for limit cycle walking Joseph H Solomon1 and simple control methodologies for these models (Collins & Ruina, 2005; Hobbelen & Wisse, 2008a, 2008b. Corresponding author: Joseph H. Solomon, Northwestern University, Department of Mechanical Engineering, 2145

Hartmann, Mitra J. Z.

238

Electric network interconnection of Mashreq Arab Countries  

SciTech Connect (OSTI)

Power system interconnection is a well established practice for a variety of technical and economical reasons. Several interconnected networks exist worldwide for a number of factors. Some of these networks cross international boundaries. This presentation discusses the future developments of the power systems of Mashreq Arab Countries (MAC). MAC consists of Bahrain, Egypt, Iraq, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, United Arab Emirates (UAE), and Yemen. Mac power systems are operated by government or semigovernment bodies. Many of these countries have national or regional electric grids but are generally isolated from each other. With the exception of Saudi Arabia power systems, which employ 60 Hz, all other MAC utilities use 50 Hz frequency. Each country is served by one utility, except Saudi Arabia, which is served by four major utilities and some smaller utilities serving remote towns and small load centers. The major utilities are the Saudi Consolidated electric Company in the Eastern Province (SCECO East), SCECO Center, SCECO West, and SCECO South. These are the ones considered in this study. The energy resources in MAC are varied. Countries such as Egypt, Iraq, and Syria have significant hydro resources.The gulf countries and Iraq have abundant fossil fuel, The variation in energy resources as well as the characteristics of the electric load make it essential to look into interconnections beyond the national boundaries. Most of the existing or planned interconnections involve few power systems. A study involving 12 countries and over 20 utilities with different characteristics represents a very large scale undertaking.

El-Amin, I.M.; Al-Shehri, A.M.; Opoku, G.; Al-Baiyat, S.A.; Zedan, F.M.

1994-12-01T23:59:59.000Z

239

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Broader source: Energy.gov (indexed) [DOE]

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

240

seca-core-tech-sofc-interconnect | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Developmental SOFC Interconnect Alloys PDF-1.2MB - M.P. Brady, B.A. Pint, T.R. Armstrong Products Bulk Alloy Breakout Team PDF-92KB Interconnect-Electrode Interface...

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Fast high-order variation-aware IC interconnect analysis  

E-Print Network [OSTI]

Interconnects constitute a dominant source of circuit delay for modern chip designs. The variations of critical dimensions in modern VLSI technologies lead to variability in interconnect performance that must be fully accounted for in timing...

Ye, Xiaoji

2009-05-15T23:59:59.000Z

242

National Offshore Wind Energy Grid Interconnection Study (NOWEGIS)  

Broader source: Energy.gov [DOE]

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States.

243

High temperature solid electrolyte fuel cell configurations and interconnections  

DOE Patents [OSTI]

High temperature fuel cell configurations and interconnections are made including annular cells having a solid electrolyte sandwiched between thin film electrodes. The cells are electrically interconnected along an elongated axial outer surface.

Isenberg, Arnold O. (Forest Hills, PA)

1984-01-01T23:59:59.000Z

244

Solar Energy to Benefit from New FERC Interconnection Procedures...  

Energy Savers [EERE]

Solar Energy to Benefit from New FERC Interconnection Procedures Solar Energy to Benefit from New FERC Interconnection Procedures October 30, 2014 - 5:15pm Addthis As a major win...

245

PJM Interconnection Interview on Wind  

Wind Powering America (EERE)

Vol. 9, No. 5 - December 5, 2007 Vol. 9, No. 5 - December 5, 2007 PJM on wind Wind power is growing rapidly in the United States and in Pennsylvania where 8 wind farms that total 259 megawatts now operate. Those wind farms already generate enough power for about 80,000 homes. Another 4,714 megawatts are in various stages of development within Pennsylvania, which would create enough power for an additional 1.4 mil- lion homes. Just in the Keystone state, wind power is creating thousands of jobs. Across the nation, wind power provides hundreds of millions of dollars of tax payments and rental fees to land- owners, and displaces more and more electricity that would otherwise be made by burning coal, oil, or natural gas. Wind farms create zero air pollution; require no destructive

246

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

Satchwell, Andrew

2014-01-01T23:59:59.000Z

247

New York Nuclear Profile - Nine Mile Point Nuclear Station  

U.S. Energy Information Administration (EIA) Indexed Site

Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

248

Electrically long vertical interconnects for microwave circuits and antennas  

E-Print Network [OSTI]

. . . . . 2 . . . . 3 . . . . 4 . 4 . 4 . 5 . . . . 5 . . . . 6 . . . . 7 A. Transmission Line Interconnects. . B. Electromagnetically Coupled lnterconnects . . . . . C. Conclusions . . . . . . 8 . . . 10 III FIDELITY SIMULATION 12 A. B. C. D... interconnects satisfying specifications set by Raytheon Systems Co. This research was sponsored by Raytheon Systems Co. RF/Microwave Division. A vertical interconnect couples transmission lines, antennas, and components between vertically spaced layers...

Coutant, Matthew Richard

2012-06-07T23:59:59.000Z

249

Reliability of the generation supply in an interconnected power system  

E-Print Network [OSTI]

IV Chapter V Bibliography Appendix A Appendix B DATA. RESULTS AND CONCLUSION. 27 48 50 52 LIST OF TABLES Table I Comparison of the Nethod of the Thesis to Calabrese's Nethod. Table II Calculation of Probability of Loss of Load. 55 LIST... OF FIGURES Figure 1 Figure 2 Figure 3 Figure 4 Ideal Failure Rate vs Time Curve. Unit Forced Outage Duration Annual Load Cycle for Test Case Q-Curves Interval fl Winter Load Total Sample Method. 32 Figure 5 Q-Curves Interval //2 Early Spring Load...

Holditch, Damon Will

1967-01-01T23:59:59.000Z

250

SOUTH STATION TAmtrak, Commuter  

E-Print Network [OSTI]

SOUTH STATION TAmtrak, Commuter Rail, Bus Station, MBTA Red Line Knapp St. Kneeland St. Stuart St) T BOYLSTON (MBTA Green Line) T NEW ENGLAND MEDICAL CENTER (MBTA Orange Line) Boston Campus Accessibility Map

Dennett, Daniel

251

Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington  

SciTech Connect (OSTI)

Plymouth Energy, L.L.C. (Plymouth Energy) proposes to construct and operate the Plymouth Generating Facility (PGF), which would be a 307-megawatt (MW) natural gas-fired, combined cycle power generation facility on a 44.5-acre site 2 miles west of the rural community of Plymouth in southern Benton County, Washington. Plymouth Energy has proposed that the PGF would be interconnected to the Bonneville Power Administration's (BPA's) proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately 4.7 miles west of BPA's McNary Substation. This tie-in to the McNary-John Day line would be approximately 0.6 mile to the north of the project site. Natural gas would be supplied to the project by an 800-foot pipeline lateral from the Williams Northwest Gas Pipeline Company (Williams Co.) Plymouth Compressor Station, which is located adjacent to the plant site. Water for project use would be supplied from a groundwater well whose perfected rights have been transferred to the project. A small additional quantity of water to meet plant peak needs would be obtained by lease from the neighboring farm operation. Wastewater resulting from project operations would be supplied to the neighboring farm for blending with farm-supplied water, and then used for crop irrigation. Electricity generated by the PGF would be delivered to the BPA electric grid via a new transmission interconnection for transmission of energy to regional purchasers of electricity.

N /A

2003-06-20T23:59:59.000Z

252

wind power station  

Science Journals Connector (OSTI)

wind power station [It may consist of just one wind turbine or a network of windmills] ? Windkraftanlage

2014-08-01T23:59:59.000Z

253

Eastern Interconnection Planning Collaborative News Release  

Broader source: Energy.gov (indexed) [DOE]

1 1 NEWS RELEASE FOR IMMEDIATE RELEASE May 23, 2011 Contact: David Whiteley d.a.whiteley@att.net 314-753-6200 Eastern Interconnection Grid Planning Authorities to Study Set of Stakeholder-Identified Electric System Futures The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a major step forward with the stakeholder-defined specifications for the resource futures to be considered in the macroeconomic analysis in Phase I of the Project. The stakeholders are to be congratulated for their hard work in achieving a

254

Frequency Instability Problems in North American Interconnections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frequency Instability Problems in Frequency Instability Problems in North American Interconnections May 1, 2011 DOE/NETL-2011/1473 Frequency Instability Problems in North American Interconnections Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

255

Interconnection of bundled solid oxide fuel cells  

DOE Patents [OSTI]

A system and method for electrically interconnecting a plurality of fuel cells to provide dense packing of the fuel cells. Each one of the plurality of fuel cells has a plurality of discrete electrical connection points along an outer surface. Electrical connections are made directly between the discrete electrical connection points of adjacent fuel cells so that the fuel cells can be packed more densely. Fuel cells have at least one outer electrode and at least one discrete interconnection to an inner electrode, wherein the outer electrode is one of a cathode and and anode and wherein the inner electrode is the other of the cathode and the anode. In tubular solid oxide fuel cells the discrete electrical connection points are spaced along the length of the fuel cell.

Brown, Michael; Bessette, II, Norman F; Litka, Anthony F; Schmidt, Douglas S

2014-01-14T23:59:59.000Z

256

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

257

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

258

Performance testing of small interconnected wind systems  

SciTech Connect (OSTI)

There is a need for performance information on small windmills intended for interconnected operation with utility distribution service. The owner or prospective buyer needs the data to estimate economic viability and service reliability, while the utility needs it to determine interconnection arrangements, maintain quality of power delivered by its line, and to answer customer inquiries. No existing testing program provides all the information needed, although the Rocky Flats test site comes close. To fill this need for Michigan, Consumers Power Company and the Michigan Electric Cooperative Association helped support a two-year program at Michigan State University involving extensive performance testing of an Enertech 1500 and a 4-kW Dakota with a Gemini inverter. The performance study suggested measurements necessary to characterize SWECS for interconnected operation. They include SWECS energy output to a-c line, miles of wind passing the rotor, var-hour metering for average var consumption, and recording watt, current, and voltmeters to assess SWECS output variability. Added instruments for waveform measurement (to assess power quality) are also needed. Typical data taken at the MSU test site are used to illustrate the techniques and preliminary data from a current project is given. Finally, conclusions about SWECS performance are listed.

Park, G.L.; Krauss, O.; Miller, J.

1984-05-01T23:59:59.000Z

259

Federal Utility Partnership Working Group - Utility Interconnection Panel  

Broader source: Energy.gov (indexed) [DOE]

WORKING GROUP - Utility Interconnection Panel M. Renee Jewell, Program/Energy Manager, & Contracting Officer, Forest Service (reneejewell@fs.fed.us) SCENARIO: Fed Agencies had Solar PV Projects To Connect with Utility in California * United States (US) Forest Service (FS) - 1 small Solar Photovoltaic (PV) project; and - 1 small Renewable project (Solar PV) exporting energy to grid. * U.S. National Park Service (NPS) - 24 Small Solar Photovoltaic projects. * U.S. Dept. of Veterans Affairs (VA) - 6 Renewable generation projects of different sizes. FS Region 5 (California) - Solar Photovoltaic Installations Solar PV Project @ Mono Lake Visitor Center (Inyo NF) Solar PV Project (net exporter) @ San Dimas Technology and Development Center SITUATION - Utility Wanted Feds to Sign Its

260

Updating Interconnection Screens for PV System Integration  

SciTech Connect (OSTI)

This white paper evaluates the origins and usefulness of the capacity penetration screen, offer short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen. Short-term and longer-term alternatives approaches are offered as examples; however, specific modifications to screening procedures should be discussed with stakeholders and must ultimately be adopted by state and federal regulatory bodies.

Coddington, M.; Mather, B.; Kroposki, B.; Lynn, K.; Razon, A.; Ellis, A.; Hill, R.; Key, T.; Nicole, K.; Smith, J.

2012-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Repairable chip bonding/interconnect process  

DOE Patents [OSTI]

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

1997-01-01T23:59:59.000Z

262

Early Station Costs Questionnaire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

263

Hot Plate Station  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

temperature is limited to 200C in order to maintain temperature inside the cleanroom. A hood located over the hot plate station ensures evaporated fumes are not released...

264

Topic B Awardee: Eastern Interconnection States' Planning Council |  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection States' Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the American Recovery and Reinvestment Act (ARRA). The goal is to create an unprecedented collaborative among the states in the Eastern Interconnection. Comprised of public utility commissions, Governors' offices, energy offices, and other key government representatives, this collaboration will foster and produce consistent and coordinated direction to the regional and interconnection-level analyses and planning. Significant state input and direction increases the probability that the outputs will be useful to the

265

Recovery Act Interconnection Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

266

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Broader source: Energy.gov (indexed) [DOE]

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

267

Flip chip electrical interconnection by selective electroplating and bonding  

E-Print Network [OSTI]

on a glass substrate made of 500/2000 A° of Cr/Au with 3150 lm in length and 10 lm in width. Two silicon. The interconnection chip has 102 Cr/Au interconnection lines with 3150 lm in length and 10 lm in width. The bonding pads on the ends of the interconnection lines are 40 lm by 40 lm. A 0.8 lm thick layer of aluminum

Lin, Liwei

268

Optimal control locations for a class of large interconnected dynamic systems  

E-Print Network [OSTI]

system, a stability crisis usually arises when a fault occurs at one or more major transmission lines. After such a fault, the system suddenly possesses an excess of unevenly distributed kinetic energy. If no action is taken, this energy excess could... cause the phase angles of the generators to swing wildly and thus overload and eventually trip breakers on some interconnecting transmission lines. An open breaker essentially deletes a line from the system, which in turn triggers the possible...

Antonio, John Kirby

2012-06-07T23:59:59.000Z

269

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect (OSTI)

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

270

Community Wind Handbook/Research Interconnecting behind Your...  

Open Energy Info (EERE)

your local utility. Most utilities and other electricity providers require you to enter into a formal agreement with them before you are allowed to interconnect your wind...

271

Pepco and PJM Interconnection Comments on District of Columbia...  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM...

272

CHP: Connecting the Gap between Markets and Utility Interconnection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Markets and Utility Interconnection and Tariff Practices, 2006 The adoption of combined heat and power (CHP) systems by American industries has made substantial strides in the...

273

Physics of Failure of Electrical Interconnects | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies Program Annual Merit Review and Peer Evaluation ape036devoto2011p.pdf More Documents & Publications Physics of Failure of Electrical Interconnects Reliability...

274

Proposed rule for Interconnection for Wind Energy and Other Alternativ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REGULATORY COMMISSION 18 CFR Part 35 (Docket No. RM05-4-000) Interconnection for Wind Energy and Other Alternative Technologies (January 24, 2005) AGENCY: Federal Energy...

275

RAPID/Geothermal/Transmission Siting & Interconnection/Montana...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionMontana) Jump to: navigation, search RAPID Regulatory and Permitting...

276

RAPID/Geothermal/Transmission Siting & Interconnection/Hawaii...  

Open Energy Info (EERE)

Utilities Commission to interconnect a proposed renewable energy project to the existing grid. Transmission Siting Threshold: No threshold provided Public Utility Definition for...

277

RAPID/Geothermal/Transmission Siting & Interconnection/Utah ...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionUtah) Jump to: navigation, search RAPID Regulatory and Permitting...

278

RAPID/Geothermal/Transmission Siting & Interconnection/Oregon...  

Open Energy Info (EERE)

| Geothermal | Transmission Siting & Interconnection(Redirected from RAPIDGeothermalGrid ConnectionOregon) Jump to: navigation, search RAPID Regulatory and Permitting...

279

U.S. Army Fort Carson Interconnection Agreement  

Broader source: Energy.gov [DOE]

Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA).

280

Modelling of interconnects including coaxial cables and multiconductor lines.  

E-Print Network [OSTI]

??In recent years, electromagnetic compatibility (EMC) problems associated with high frequency and high speed interconnects are becoming of increasing concern. Coaxial cables are a popular (more)

Teo, Yu Xian

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

National Offshore Wind Energy Grid Interconnection Study  

SciTech Connect (OSTI)

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States. A total of 54GW of offshore wind was assumed to be the target for the analyses conducted. A variety of issues are considered including: the anticipated staging of offshore wind; the offshore wind resource availability; offshore wind energy power production profiles; offshore wind variability; present and potential technologies for collection and delivery of offshore wind energy to the onshore grid; potential impacts to existing utility systems most likely to receive large amounts of offshore wind; and regulatory influences on offshore wind development. The technologies considered the reliability of various high-voltage ac (HVAC) and high-voltage dc (HVDC) technology options and configurations. The utility system impacts of GW-scale integration of offshore wind are considered from an operational steady-state perspective and from a regional and national production cost perspective.

Daniel, John P. [ABB Inc; Liu, Shu [ABB Inc; Ibanez, Eduardo [National Renewable Energy Laboratory; Pennock, Ken [AWS Truepower; Reed, Greg [University of Pittsburgh; Hanes, Spencer [Duke Energy

2014-07-30T23:59:59.000Z

282

Daily Reporting Rainfall Station HERBERT RIVER Manual Heavy Rainfall Station  

E-Print Network [OSTI]

Daily Reporting Rainfall Station HERBERT RIVER Manual Heavy Rainfall Station Manual River Station Central Mill AL Tung Oil AL Corsis AL Innisfail Clump Point Tide TM Mourilyan Harbour TM 0 10 kilometres

Greenslade, Diana

283

Nuclear-renewable hybrid energy systems: Opportunities, interconnections, and needs  

SciTech Connect (OSTI)

As the U.S. energy system evolves, the amount of electricity from variable-generation sources is likely to increase, which could result in additional times when electricity demand is lower than available production. Thus, purveyors of technologies that traditionally have provided base-load electricitysuch as nuclear power plantscan explore new operating procedures to deal with the associated market signals. Concurrently, innovations in nuclear reactor design coupled with sophisticated control systems now allow for more complex apportionment of heat within an integrated system such as one linked to energy-intensive chemical processes. This paper explores one opportunity nuclear-renewable hybrid energy systems. These are defined as integrated facilities comprised of nuclear reactors, renewable energy generation, and industrial processes that can simultaneously address the need for grid flexibility, greenhouse gas emission reductions, and optimal use of investment capital. Six aspects of interaction (interconnections) between elements of nuclear-renewable hybrid energy systems are identified: Thermal, electrical, chemical, hydrogen, mechanical, and information. Additionally, system-level aspects affect selection, design, and operation of this hybrid system type. Throughout the paper, gaps and research needs are identified to promote further exploration of the topic.

Mark F. Ruth; Owen R. Zinaman; Mark Antkowiak; Richard D. Boardman; Robert S. Cherry; Morgan D. Bazilian

2014-02-01T23:59:59.000Z

284

Phase 1 - Evaluation of a Functional Interconnect System for Solid Oxide Fuel Cells  

SciTech Connect (OSTI)

This project is focused on evaluating the suitability of materials and complex multi-materials systems for use as solid oxide fuel cell interconnects. ATI Allegheny Ludlum has generated promising results for interconnect materials which incorporate modified surfaces. Methods for producing these surfaces include cladding, which permits the use of novel materials, and modifications via unique thermomechanical processing, which allows for the modification of materials chemistry. The University of Pittsburgh is assisting in this effort by providing use of their in-place facilities for dual atmosphere testing and ASR measurements, along with substantial work to characterize post-exposure specimens. Carnegie Mellon is testing interconnects for chromia scale spallation resistance using macro-scale and nano-scale indentation tests. Chromia spallation can increase electrical resistance to unacceptable levels and interconnect systems must be developed that will not experience spallation within 40,000 hours at operating temperatures. Spallation is one of three interconnect failure mechanisms, the others being excessive growth of the chromia scale (increasing electrical resistance) and scale evaporation (which can poison the cathode). The goal of indentation fracture testing at Carnegie Mellon is to accelerate the evaluation of new interconnect systems (by inducing spalls at after short exposure times) and to use fracture mechanics to understand mechanisms leading to premature interconnect failure by spallation. Tests include bare alloys from ATI and coated systems from DOE Laboratories and industrial partners, using ATI alloy substrates. West Virginia University is working towards developing a cost-effective material for use as a contact material in the cathode chamber of the SOFC. Currently materials such as platinum are well suited for this purpose, but are cost-prohibitive. For the solid-oxide fuel cell to become a commercial reality it is imperative that lower cost components be developed. Based on the results obtained to date, it appears that sterling silver could be an inexpensive, dependable candidate for use as a contacting material in the cathode chamber of the solid-oxide fuel cell. Although data regarding pure silver samples show a lower rate of thickness reduction, the much lower cost of sterling silver makes it an attractive alternative for use in SOFC operation.

James M. Rakowski

2006-09-30T23:59:59.000Z

285

EIS-0345: Plymouth Generating Facility Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to approve Plymouth Energy, L.L.C. proposed 307-megawatt (MW), natural gas-fired, combined cycle power generation facility to interconnect into BPAs regional transmission system.

286

The Design and Tests in a Three Interconnected Fluidized Bed  

Science Journals Connector (OSTI)

Hydrogen production based on chemical looping combustion can obtain clean hydrogen with near zero emission of carbon dioxide. This technique can be auto-thermal, making it very promising for hydrogen production. In this paper, the interconnected fluidized ... Keywords: chemical looping combustion, hydrogen production Interconnected fluidized beds

Junjiao Zhang; Jingzhou Jiang; Qiang Lu; Changqing Dong; Teng Zhang; Xinglei Liu; Zhiyong Liang; Yongping Yang

2010-12-01T23:59:59.000Z

287

A Scalable Interconnection Network Architecture for Petaflops Computing  

Science Journals Connector (OSTI)

Extrapolating technology advances in the near future, a computer architecture capable of petaflops performance will likely be based on a collection of processing nodes interconnected by a high-performance network. One possible organization would consist ... Keywords: computer architecture, interconnection networks, performance analysis, petaflops computing

Constantine Katsinis; Bahram Nabet

2004-02-01T23:59:59.000Z

288

Trinity Public Utilities District Direct Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

LEAD FEDERAL AGENCY: U.S. Department of Energy LEAD FEDERAL AGENCY: U.S. Department of Energy COOPERATING AGENCIES: U.S. Forest Service, U.S. Bureau of Land Management, U.S. Bureau of Reclamation TITLE: Final Environmental Impact Statement for the Trinity Public Utilities District Direct Interconnection Project, DOE/EIS-0389 LOCATION: Trinity County, California CONTACT: For additional information on this For general information on the final environmental impact U.S. Department of Energy National statement, contact: Environmental Policy Act process, write or call: Mr. Mark J. Wieringa Ms. Carol M. Borgstrom, Director Western Area Power Administration Office of NEPA Policy and Compliance P.O. Box 281213 Health, Safety and Security (GC-20) Lakewood, CO 80228 U.S. Department of Energy

289

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

290

Pepco and PJM Interconnection Comments on District of Columbia Public  

Broader source: Energy.gov (indexed) [DOE]

Pepco and PJM Interconnection Comments on District of Columbia Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the Department of Energy on February 17, 2006. Potomac Electric Power Company and PJM Interconnection, L.L.C. jointly submit these comments and answer to the requests for rehearing submitted by the City of Alexandria, Virginia and the Director of the Virginia Department of Environmental Quality in the captioned proceeding . Pepco and PJM Interconnection Comments on District of Columbia Public

291

Low Carbon Jobs in an Interconnected World | Open Energy Information  

Open Energy Info (EERE)

Jobs in an Interconnected World Jobs in an Interconnected World Jump to: navigation, search Name Low Carbon Jobs in an Interconnected World Agency/Company /Organization Global Climate Network Partner Institute for Public Policy Research Sector Energy Focus Area Energy Efficiency, Renewable Energy Topics Co-benefits assessment, Background analysis Website http://www.ippr.org.uk/publica Country Australia, Brazil, China, Germany, India, Nigeria, South Africa, United Kingdom, United States Australia and New Zealand, South America, Eastern Asia, Western Europe, Southern Asia, Western Africa, Southern Africa, Northern Europe, Northern America References Low Carbon Jobs in an Interconnected World[1] Low Carbon Jobs in an Interconnected World Author: Global Climate Network Price: Free Publication Date: 30 March 2010

292

Eastern Renewable Generation Integration Study: Initial Results (Poster)  

SciTech Connect (OSTI)

This poster presents an overview of the Eastern Renewable Generation Integration Study, which aims to answer critical questions about the future of the Eastern Interconnection under high levels of solar and wind generation penetration.

Bloom, A.; Townsend, A.; Hummon, M.; Weekley, A.; Clark, K.; King, J.

2013-10-01T23:59:59.000Z

293

A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth to Enable Latency Reduction  

E-Print Network [OSTI]

D R A FT 1 A High-Performance Optoelectronic Interconnect Router: Using Increased Bandwidth optoelectronic interconnection network router capable of supplying and efficiently utilizing higher bandwidth routing, interconnection network, latency hiding/reduction techniques, optoelectronic router. 1

Pinkston, Timothy M.

294

Refueling Stations | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search TODO: Add description List of Refueling Stations Incentives Retrieved from "http:en.openei.orgwindex.php?titleRefuelingStations&oldid267188...

295

The Development of Interconnection Standards in Six States In 2007-2008  

SciTech Connect (OSTI)

This paper discusses the process of developing standards for the interconnection of photovoltaic systems and other generators under ten megawatts to the electric grid. State utility commission rulemakings in 2007-2008 in Florida, New Mexico, North Carolina, Maryland, Illinois and Utah provide the basis for analysis of what is and should be considered in the development of standards, and how the process can be improved. State interconnection standards vary substantially, and many utilities have discretion to establish additional or different requirements, creating literally hundreds of sets of rules. This lack of uniformity imposes a significant cost on project developers and installers to track and comply with applicable rules. As well, burdensome provisions and uncertain costs and timelines present formidable barriers to entry, which advocates have limited resources to challenge. For a better process, the author proposes: establishing federal standards as a baseline, involving solar advocates, and developing a utility cost-recovery mechanism.

Keyes, Jason B.

2008-04-01T23:59:59.000Z

296

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION COMMISSION Joel Klein Principal Author Ivin Rhyne Manager ELECTRICITY ANALYSIS OFFICE Sylvia Bender DeputyCann Please use the following citation for this report: Klein, Joel. 2009. Comparative Costs of California

297

Recent developments in HVDC convertor station design  

SciTech Connect (OSTI)

New requirements on HVDC convertor station performance have emerged during the past few years. The paper presents some of these requirements and shows how they have been met through equipment and system development. This development will result in a new generation of HVDC transmissions with still better performance than for the projects presently in operation.

Carlsson, L.

1984-08-01T23:59:59.000Z

298

E-Print Network 3.0 - attach interconnection technology Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barbara; NONE Collection: Biology and Medicine ; Engineering 7 Call for Papers Optoelectronic Interconnects XII (OE113) Summary: interconnect technologies ultra-short reach...

299

Air Quality Impact of Distributed Generation of Electricity  

E-Print Network [OSTI]

Distributed Generators .from a typical distributed generator. Therefore, there is aStations 3.3.1 Distributed Generators The physical

Jing, Qiguo

2011-01-01T23:59:59.000Z

300

Data integrity for on-chip interconnects  

E-Print Network [OSTI]

based on prediction, the approaches use coding techniques to eliminate high delay cases to generate a higher transmission rate. The work also extends communication theoretic approaches to other areas of VLSI design. Parity groups are generated based...

Singhal, Rohit

2007-09-17T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE/EIS-0183: Record of Decision for the Electrical Interconnection of the Shepherds Flat Wind Energy Project (07/18/08)  

Broader source: Energy.gov (indexed) [DOE]

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project July 2008 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind

302

Operational Experience in Nuclear Power Stations [and Discussion  

Science Journals Connector (OSTI)

...Operational Experience in Nuclear Power Stations...self-sustaining nuclear reaction to the present...time large-scale generation of electrical power from nuclear energy has become...the C.E.G.B. reactors have been in service...

1974-01-01T23:59:59.000Z

303

PARS II New Contractor Information for Interconnection Security Agreement  

Broader source: Energy.gov (indexed) [DOE]

New Contractor Information for Interconnection Security Agreement New Contractor Information for Interconnection Security Agreement V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System (PARS) II System Owner and the contractor sign an Interconnection Security Agreement (ISA). The requirement for an Interconnection Security Agreement can be found on page 182 of the PCSP. The ISA template is available for review on the PARS II portal (http://management.energy.gov/online_resources/pars2.htm) under Contractor Documents. Before the contractor begins sending data to PARS II, DOE will send the ISA to the contractor for review and signature. In order to prepare the ISA for review and signature, the PARS II Support Team needs

304

Interconnecting PV on NYC's Secondary Network Distribution System  

Broader source: Energy.gov [DOE]

To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report.

305

Photovoltaic Systems Interconnected onto Secondary Network Distribution Systems Success Stories  

Broader source: Energy.gov [DOE]

This report examines six case studies of photovoltaic (PV) systems integrated into secondary network systems. The six PV systems were chosen for evaluation because they are interconnected to secondary network systems located in four major Solar America Cities.

306

An optical data receiver for integrated photonic interconnects  

E-Print Network [OSTI]

The throughput bounds of traditional interconnect networks in microprocessors are being pushed to their limits. In past single-core processors, the number of long global wires constituted only a small fraction of the total. ...

Georgas, Michael S. (Michael Stephen)

2009-01-01T23:59:59.000Z

307

Evaluation of phase change materials for reconfigurable interconnects  

E-Print Network [OSTI]

The possible use of programmable integrated circuit interconnect vias using an indirectly heated phase change material is evaluated. Process development and materials investigations are examined. Devices capable of multiple ...

Khoo, Chee Ying

2010-01-01T23:59:59.000Z

308

Perspectives on the metallic interconnects for solid oxide fuel cells  

Science Journals Connector (OSTI)

The various stages and progress in the development of interconnect materials for solid oxide fuel cells (SOFCs) over the last two decades are reviewed. The criteria for the application of materials as intercon...

Wei-zhong Zhu; Mi Yan

2004-12-01T23:59:59.000Z

309

5 F 13 Optica1 Interconnection T ransmitter Power BER  

E-Print Network [OSTI]

¼ 5¸ ¤ ü ? ø Ð Ð ú ¸ ? í ® F? 13 Optica1 Interconnection? T ransmitter Power Í BER? ? û - ¡ ü ?

Choi, Woo-Young

310

New Report Characterizes Existing Offshore Wind Grid Interconnection Capabilities  

Broader source: Energy.gov [DOE]

The Energy Department today released the first National Offshore Wind Energy Grid Interconnection Study that investigated the key economic and technological factors that will influence the integration of offshore wind energy onto the national grid.

311

Interconnect modeling and optimization in deep sub-micron technologies  

E-Print Network [OSTI]

Interconnect will be a major bottleneck for deep sub-micron technologies in the years to come. This dissertation addresses the communication aspect from a power consumption and transmission speed perspective. A model for ...

Sotiriadis, Paul Peter P. (Paul Peter Peter-Paul), 1973-

2002-01-01T23:59:59.000Z

312

Accelerating Communication in On-Chip Interconnection Networks  

E-Print Network [OSTI]

. In this dissertation, several schemes are proposed to accelerate communication in on-chip interconnection networks within area and cost budgets to overcome the problems. First, an early transition scheme for fully adaptive routing algorithms is proposed to improve...

Ahn, Minseon

2012-07-16T23:59:59.000Z

313

Design and analysis of high performance multistage interconnection networks  

E-Print Network [OSTI]

an analytical model to compare its performance with the existing designs reported in the literature. We validate on model with extensive simulation studies. Index Terms - Multistage interconnection networks, packet switching, static buffer allocation, dynamic...

Bhogavilli, Suresh K

2012-06-07T23:59:59.000Z

314

Topic B Awardee: Eastern Interconnection States' Planning Council  

Broader source: Energy.gov [DOE]

TheEastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the...

315

EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration (Desert Southwest Region) is preparing an EA that will assess the potential environmental impacts of a proposal to interconnect the planned Ridgenose Solar Energy Project to Westerns transmission system. Westerns actions could include constructing less than a mile of new transmission line from the solar facility to an existing substation, constructing an interconnection substation, and adding, moving, or modifying structures.

316

A computer program for HVDC converter station RF noise calculations  

SciTech Connect (OSTI)

HVDC converter station operations generate radio frequency (RF) electromagnetic (EM) noise which could interfere with adjacent communication and computer equipment, and carrier system operations. A generic Radio Frequency Computer Analysis Program (RAFCAP) for calculating the EM noise generated by valve ignition of a converter station has been developed as part of a larger project. The program calculates RF voltages, currents, complex power, ground level electric field strength and magnetic flux density in and around an HVDC converter station. The program requires the converter station network to be represented by frequency dependent impedance functions. Comparisons of calculated and measured values are given for an actual HVDC station to illustrate the validity of the program. RAFCAP is designed to be used by engineers for the purpose of calculating the RF noise produced by the igniting of HVDC converter valves.

Kasten, D.G.; Caldecott, R.; Sebo, S.A. (Ohio State Univ., Columbus, OH (United States). Dept. of Electrical Engineering); Liu, Y. (Virginia Polytechnic Inst. State Univ., Blacksburg, VA (United States). Bradley Dept. of Electrical Engineering)

1994-04-01T23:59:59.000Z

317

Mobile Alternative Fueling Station Locator  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fueling Station Locator Alternative Fueling Station Locator Fuel Type Biodiesel (B20 and above) Compressed Natural Gas Electric Ethanol (E85) Hydrogen Liquefied Natural Gas (LNG) Liquefied Petroleum Gas (Propane) Location Enter a city, postal code, or address Include private stations Not all stations are open to the public. Choose this option to also search private fueling stations. Search Caution: The AFDC recommends that users verify that stations are open, available to the public, and have the fuel prior to making a trip to that location. Some stations in our database have addresses that could not be located by the Station Locator application. This may result in the station appearing in the center of the zip code area instead of the actual location. If you're having difficulty, please contact the technical response team at

318

EIS-0342: Wanapa Energy Center Interconnection  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to suppport the installation of highly efficient combustion turbines (CTs) generators at the Wanapa Energy Center. Each CT would exhaust through a heat recovery steam generator that can be fired by auxiliary duct burners. The HRSGs would produce steam to be used onsite in condensing steam turbines.

319

Princeton Station Lewis  

E-Print Network [OSTI]

Dean Mathey Princeton Hospital Forrestal AOS PPPL Millstone Apts Dean Mathey Icahn 8:00 AM Mathey Princeton Hospital Forrestal AOS PPPL Millstone Apts Dean Mathey Icahn Order of Stops: Princeton Station; Lewis Lirbary; Dean Mathey; Princeton Hospital Forrestal AOS; PPPL

Singh, Jaswinder Pal

320

Ann Arbor Seismograph Station  

Science Journals Connector (OSTI)

...MEMBERSHIP COHM ITTEE Ross R. Heinrich...n~bers and changes or address should...seismograms, (2) a world-wide...Utah a 0.3 Bonneville lake beds Scoresbysund...Alaska 1.1 2.0 Graywacke...Stores, 221 North Grand Boulevard...SEISM and the name of the station...day of month (2) ml n2 sl s2...

James T. Wilson

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0435: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement EIS-0435: Final Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota...

322

Signature analysis of the primary components of the Koeberg nuclear power station / J.A. Bezuidenhout.  

E-Print Network [OSTI]

??In line with its commitment to safe nuclear power generation, the Koeberg Nuclear Power Station (KNPS) replaced the outdated vibration monitoring system with a modern (more)

Bezuidenhout, Jandr Albert

2010-01-01T23:59:59.000Z

323

Interconnecting gold islands with DNA origami  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to integrate the bottom-up self-assembly of DNA origami with the top-down lithographic methods used to generate surface patterning. In this report we demonstrate that fixed length...

324

Quantitative Analysis of Station Hydrogen  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis of Station Analysis of Station Hydrogen * Role of ENAA (Engineering Advancement Association of Japan) - To manage the construction and operation of hydrogen stations in national project, JHFC Project - To act as secretariat of ISO/TC197 (Hydrogen technologies) committee of Japan Kazuo Koseki Chief Secretary of ISO/TC197 of Japan ENAA Yokohama Daikoku Station (Desulfurized Gasoline) Yokohama Asahi Station (Naphtha) Senju Station (LPG) Kawasaki Station (Methanol) Yokohama Asahi Station Naphtha PSA Compressor Storage Tanks Dispenser Reformer Buffer Tank 25 MPa 35 MPa 1073 K 0.8 MPa Inlet : 0.6 MPa Outlet : 40 MPa Vent Stack 40 MPa Result of Quantitative Analysis Concentration. vol.ppm Min.Detect Analysis Impurity Gasoline Naphtha LPG Methanol Conc. Method CO 0.05 0.06 0.02 0.06 0.01 GC-FID

325

Station Instruction Cooperative  

E-Print Network [OSTI]

$0 INSTITUTE OF MUSEUM/LIBRARY SV $0 $0 $0 $135,575 $0 $135,575 NATIONAL AERO & SPACE ADMIN $971General Research Experiment Station Instruction Public Service Cooperative Extension Total $96,610,455 23,968,233 14,198,142 ARRA 6,188,801 Public Service (PS) 33,400,117 45,534,482 34,497,464 39

Arnold, Jonathan

326

Pacific Southwest Research Station Publications  

E-Print Network [OSTI]

Bulletins 1- 28 1965-1989 Soil- Vegetation Tables -- 1965-1980 Solar Irradiation and Shadow Length Tables-1971 1938 California Forest and Range Experiment Station Annual Report 1939 California Forest and Range Experiment Station Annual Report 1940 California Forest and Range Experiment Station Annual Report 1951

Standiford, Richard B.

327

Xcel Energy Comanche Station: Pueblo, Colorado (Data)  

SciTech Connect (OSTI)

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

2007-06-20T23:59:59.000Z

328

Xcel Energy Comanche Station: Pueblo, Colorado (Data)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

329

National Electric Transmission Study 2006 Western Interconnection Analysis  

Broader source: Energy.gov (indexed) [DOE]

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

330

Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrodeposited Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects H. McCrabb * , T. Hall * , J. Wu # , H. Zhang # , X. Liu # , E.J. Taylor * * Faraday Technology Inc., 315 Huls Dr., Clayton, OH 45315, USA # West Virginia University, Dept. of Mechanical and Aerospace Eng.ESB, Morgantown, WV, 26506, USA Overall Objective Overall Objective Principal Investigator: Heather McCrabb, Company Name: Faraday Technology, Inc., Address: 315 Huls Drive, Clayton, OH 45315, Phone: 937-836-7749, E-mail: heathermccrabb@faradaytechnology.com, Company website: faradaytechnology.com Previous Work at WVU Results Develop an inexpensive manufacturing process for depositing (Mn,Co) 3 O 4 spinel coatings onto SOFC interconnects. Introduction The decrease in the SOFC operating temperatures from 1000°C to between 650 and 850°C has enabled the use of chromia-forming ferritic stainless steels as interconnects

331

Renewable Energy Interconnection and Storage - Technical Aspects | Open  

Open Energy Info (EERE)

Renewable Energy Interconnection and Storage - Technical Aspects Renewable Energy Interconnection and Storage - Technical Aspects Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Interconnection_and_Storage_-_Technical_Aspects&oldid=514543"

332

Graphene interconnects fully encapsulated in layered insulator hexagonal boron nitride  

Science Journals Connector (OSTI)

We demonstrate improvements in the electrical performance of graphene interconnects with full encapsulation by lattice-matching layered insulator, hexagonal boron nitride (h-BN). A novel layer-based transfer method is developed to assemble the top passivating layer of h-BN on the graphene surface to construct the h-BN/graphene/h-BN heterostructures. The encapsulated graphene interconnects (EGIs) are characterized and compared with graphene interconnects on either SiO2 or h-BN substrates with no top passivating h-BN layer. We observe significant improvements in both the maximum current density and breakdown voltage in EGIs. Compared with the uncovered structures, EGIs also show an appreciable increase (~67%) in power density at breakdown. These improvements are achieved without degrading the carrier transport characteristics in graphene wires. In addition, EGIs exhibit a minimal environment impact, showing electrical behavior insensitive to ambient conditions.

Nikhil Jain; Chris A Durcan; Robin Jacobs-Gedrim; Yang Xu; Bin Yu

2013-01-01T23:59:59.000Z

333

High speed imager test station  

DOE Patents [OSTI]

A test station enables the performance of a solid state imager (herein called a focal plane array or FPA) to be determined at high image frame rates. A programmable waveform generator is adapted to generate clock pulses at determinable rates for clock light-induced charges from a FPA. The FPA is mounted on an imager header board for placing the imager in operable proximity to level shifters for receiving the clock pulses and outputting pulses effective to clock charge from the pixels forming the FPA. Each of the clock level shifters is driven by leading and trailing edge portions of the clock pulses to reduce power dissipation in the FPA. Analog circuits receive output charge pulses clocked from the FPA pixels. The analog circuits condition the charge pulses to cancel noise in the pulses and to determine and hold a peak value of the charge for digitizing. A high speed digitizer receives the peak signal value and outputs a digital representation of each one of the charge pulses. A video system then displays an image associated with the digital representation of the output charge pulses clocked from the FPA. In one embodiment, the FPA image is formatted to a standard video format for display on conventional video equipment. 12 figs.

Yates, G.J.; Albright, K.L.; Turko, B.T.

1995-11-14T23:59:59.000Z

334

High speed imager test station  

DOE Patents [OSTI]

A test station enables the performance of a solid state imager (herein called a focal plane array or FPA) to be determined at high image frame rates. A programmable waveform generator is adapted to generate clock pulses at determinable rates for clock light-induced charges from a FPA. The FPA is mounted on an imager header board for placing the imager in operable proximity to level shifters for receiving the clock pulses and outputting pulses effective to clock charge from the pixels forming the FPA. Each of the clock level shifters is driven by leading and trailing edge portions of the clock pulses to reduce power dissipation in the FPA. Analog circuits receive output charge pulses clocked from the FPA pixels. The analog circuits condition the charge pulses to cancel noise in the pulses and to determine and hold a peak value of the charge for digitizing. A high speed digitizer receives the peak signal value and outputs a digital representation of each one of the charge pulses. A video system then displays an image associated with the digital representation of the output charge pulses clocked from the FPA. In one embodiment, the FPA image is formatted to a standard video format for display on conventional video equipment.

Yates, George J. (Santa Fe, NM); Albright, Kevin L. (Los Alamos, NM); Turko, Bojan T. (Moraga, CA)

1995-01-01T23:59:59.000Z

335

Alternative Fuels Data Center: Ethanol Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fueling Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Ethanol Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Ethanol Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Ethanol Fueling Stations on Google Bookmark Alternative Fuels Data Center: Ethanol Fueling Stations on Delicious Rank Alternative Fuels Data Center: Ethanol Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Ethanol Fueling Stations on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Ethanol Fueling Stations Photo of an ethanol fueling station. Thousands of ethanol fueling stations are available in the United States.

336

Alternative Fuels Data Center: Hydrogen Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fueling Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Hydrogen Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Hydrogen Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Hydrogen Fueling Stations on Google Bookmark Alternative Fuels Data Center: Hydrogen Fueling Stations on Delicious Rank Alternative Fuels Data Center: Hydrogen Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Hydrogen Fueling Stations on AddThis.com... More in this section... Hydrogen Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Hydrogen Fueling Stations Photo of a hydrogen fueling station. A handful of hydrogen fueling stations are available in the United States

337

Alternative Fuels Data Center: Biodiesel Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fueling Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Fueling Stations on Google Bookmark Alternative Fuels Data Center: Biodiesel Fueling Stations on Delicious Rank Alternative Fuels Data Center: Biodiesel Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Fueling Stations on AddThis.com... More in this section... Biodiesel Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Biodiesel Fueling Stations Photo of a biodiesel fueling station. Hundreds of biodiesel fueling stations are available in the United States.

338

DC Connected Hybrid Offshore-Wind and Tidal Turbine Generation System  

Science Journals Connector (OSTI)

Hybrid Offshore-wind and Tidal Turbine (HOTT) generation system (Rahman and ... interconnecting method for a DC side cluster of wind and tidal turbine generators system are proposed. This method can be achieved...

Mohammad Lutfur Rahman; Yasuyuki Shirai

2010-01-01T23:59:59.000Z

339

Steam generator support system  

DOE Patents [OSTI]

A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances.

Moldenhauer, James E. (Simi Valley, CA)

1987-01-01T23:59:59.000Z

340

Steam generator support system  

DOE Patents [OSTI]

A support system for connection to an outer surface of a J-shaped steam generator for use with a nuclear reactor or other liquid metal cooled power source is disclosed. The J-shaped steam generator is mounted with the bent portion at the bottom. An arrangement of elongated rod members provides both horizontal and vertical support for the steam generator. The rod members are interconnected to the steam generator assembly and a support structure in a manner which provides for thermal distortion of the steam generator without the transfer of bending moments to the support structure and in a like manner substantially minimizes forces being transferred between the support structure and the steam generator as a result of seismic disturbances. 4 figs.

Moldenhauer, J.E.

1987-08-25T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The generative mechanisms of digital infrastructure evolution  

Science Journals Connector (OSTI)

The current literature on digital infrastructure offers powerful lenses for conceptualizing the increasingly interconnected information system collectives found in contemporary organizations. However, little attention has been paid to the generative ... Keywords: adoption, case study, case survey, configuration theory, critical realism, digital infrastructure, generative mechanism, information infrastructure, innovation, multimethod, scaling

Ola Henfridsson, Bendik Bygstad

2013-09-01T23:59:59.000Z

342

Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

classification) NREL National Renewable Energy Laboratory RFP request for proposals SMR steam methane reformer SOTA state of the art (referring to station classification) TAR...

343

STABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS  

E-Print Network [OSTI]

, with energy imbalance in the physical system, with or without network congestion, driving the market responseSTABILITY ANALYSIS OF INTERCONNECTED POWER SYSTEMS COUPLED WITH MARKET DYNAMICS F.L. Alvarado1 J University of Paraiba, Brazil Abstract: The use of market mechanisms to determine gen- eration dispatch

344

Energy and Reliability in Future NOC Interconnected CMPS  

E-Print Network [OSTI]

In this dissertation, I explore energy and reliability in future NoC (Network-on-Chip) interconnected CMPs (chip multiprocessors) as they have become a first-order constraint in future CMP design. In the first part, we target the root cause...

Kim, Hyungjun

2013-08-01T23:59:59.000Z

345

Solar Energy to Benefit from New FERC Interconnection Procedures  

Office of Energy Efficiency and Renewable Energy (EERE)

As a major win for solar and testament to the impact of Department of Energys SunShot Initiative funded research at the national labs, this past month Federal Energy Regulatory Commission announced the adoption of new fast track rules to make the interconnection process dramatically cheaper and faster for small wholesale energy projects, representing a major improvement with nationwide impacts.

346

Hermetic aluminum radio frequency interconnection and method for making  

DOE Patents [OSTI]

The present invention provides a light-weight, hermetic coaxial radio-frequency (RF) interconnection having an electrically conductive outer housing made of aluminum or an aluminum alloy, a central electrical conductor made of ferrous or non-ferrous material, and a cylinder of dielectric material comprising a low-melting-temperature, high-thermal-expansion aluminophosphate glass composition for hermetically sealing between the aluminum-alloy outer housing and the ferrous or non-ferrous center conductor. The entire RF interconnection assembly is made permanently hermetic by thermally fusing the center conductor, glass, and housing concurrently by bringing the glass to the melt point by way of exposure to an atmospheric temperature sufficient to melt the glass, less than 540.degree. C., but that does not melt the center conductor or the outer aluminum or aluminum alloy housing. The composition of the glass used is controlled to provide a suitable low dielectric constant so that an appropriate electrical characteristic impedance, for example 50 ohms, can be achieved for an electrical interconnection that performs well at high radio frequencies and also provides an interconnection maintaining a relatively small physical size.

Kilgo, Riley D. (Albuquerque, NM); Kovacic, Larry (Albuquerque, NM); Brow, Richard K. (Rolla, MO)

2000-01-01T23:59:59.000Z

347

Optimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects  

E-Print Network [OSTI]

tapering is shown to reduce the (a CMOS inverter) with the driver (a CMOS inverter). The power dissipatedOptimum Wire Tapering for Minimum Power Dissipation in RLC Interconnects Magdy A. El-Moursy and Eby G. Friedman Department of Electrical and Computer Engineering University of Rochester Rochester, New

Friedman, Eby G.

348

Lumped Electro-Thermal Model of On-chip Interconnects  

E-Print Network [OSTI]

, among other effects, an increase of electrical resistivity of metal inter- connect and thus of operating frequency has dramatically magnified the electrical power density leading to a signifi- cant tools in fact model interconnections by discretizing them in a set of elementary subsections and thus

Paris-Sud XI, Université de

349

Preliminary Response of PJM Interconnection, L.L.C. to the Operating...  

Broader source: Energy.gov (indexed) [DOE]

Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant...

350

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Broader source: Energy.gov (indexed) [DOE]

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

351

Notice of Availability of the Record of Decision for the Arlington Wind Interconnection Project (DOE/EIS-0183) (1/14/05)  

Broader source: Energy.gov (indexed) [DOE]

86 86 Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices 8. Mr. Mohan Singh, Regional Business Director, North Atlantic Division. Brenda S. Bowen, Army Federal Register Liaison Office. [FR Doc. 05-1383 Filed 1-25-05; 8:45 am] BILLING CODE 3710-08-M DEPARTMENT OF ENERGY Bonneville Power Administration Arlington Wind Interconnection Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms to interconnect up to 200 megawatts of wind generation from the Columbia Energy Partners' proposed Arlington Wind Project into the Federal Columbia River Transmission System. The wind project will be interconnected

352

Lunar Base Thermoelectric Power Station Study  

Science Journals Connector (OSTI)

Under NASAs Project Prometheus the Nuclear Space Power Systems Program the Jet Propulsion Laboratory Pratt & Whitney Rocketdyne and Teledyne Energy Systems have teamed with a number of universities under the Segmented Thermoelectric Multicouple Converter (STMC) Task to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and promising candidates for the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as a lunar base power station where kilowatts of power would be required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this particular mission concept. Previous lunar lander concepts had proposed the use of lunar regolith as in?situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept we will examine the benefits and requirements for a hermetically?sealed reactor thermoelectric power station module suspended within a man?made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station at its 100?m exclusion zone radius were evaluated and found to be acceptable. Site preparation activities are reviewed as well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology needs in all areas to support the development deployment operation and disposal of the unit.

William Determan; Patrick Frye; Jack Mondt; Jean?Pierre Fleurial; Ken Johnson; Gerhard Stapfer; Michael Brooks; Ben Heshmatpour

2006-01-01T23:59:59.000Z

353

Lunar Base Thermoelectric Power Station Study  

SciTech Connect (OSTI)

Under NASA's Project Prometheus, the Nuclear Space Power Systems Program, the Jet Propulsion Laboratory, Pratt and Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) Task, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing, and promising candidates for the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as a lunar base power station where kilowatts of power would be required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this particular mission concept. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed as well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology needs in all areas to support the development, deployment, operation and disposal of the unit.

Determan, William; Frye, Patrick [Jet Propulsion Laboratory, California Institute of Technology, 4800 Oak Grove Dr., Pasadena, CA 91109 (United States); Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, Gerhard [Pratt and Whitney Rocketdyne Inc., P.O. Box 7922, Canoga Park, CA 91309 (United States); Brooks, Michael; Heshmatpour, Ben [Teledyne Energy Systems, Inc., 10707 Gilroy Rd, Hunt Valley, MD 21031 (United States)

2006-01-20T23:59:59.000Z

354

Station design using orifice meters  

SciTech Connect (OSTI)

This paper reports that proper meter station design using gas orifice meters must include consideration of a number of factors to minimize operation and maintenance problems while obtaining the best accuracy over the life of the station. A station should provide accuracy, be safe, functional, economical and free of undue maintenance. It should comply with all codes, reports and specifications but most of all it should be able to comply with terms set forth in the contract. All measuring stations should be designed with considerations of growth or reductions in volume. It should be attractive and built to last for many years.

Upp, E.L. (Daniel Industries, Inc., Houston, TX (United States))

1992-07-01T23:59:59.000Z

355

Celilo Converter Station - October 2005  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

safer and ecologi- cally improved. The new thyristors eliminate reliance on mercury for power conversion. Asbestos has been removed from the station. Old, noisy, maintenance-in-...

356

Hanford Meteorological Station - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS...

357

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning- June 6, 2013  

Broader source: Energy.gov [DOE]

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

358

H C26 Performance Analysis of Optica1 Interconnection Systems Inch-ing  

E-Print Network [OSTI]

Analysis of Optica1 Interconnection Systems Inch- ing T ransmitter T emperature Dependence .è ¯ ? , ? ? ì

Choi, Woo-Young

359

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked processor  

E-Print Network [OSTI]

Analysis of free-space optical interconnects for the three-dimensional optoelectronic stacked of free-space optical interconnect for the three-dimensional optoelectronic stacked processor (3DOESP) has VLSI; Optoelectronics; VCSELs 1. Introduction Current electronic interconnection technology cannot keep

Esener, Sadik C.

360

A novel framework for exploring 3-D FPGAs with heterogeneous interconnect fabric  

Science Journals Connector (OSTI)

A heterogeneous interconnect architecture can be a useful approach for the design of 3-D FPGAs. A methodology to investigate heterogeneous interconnection schemes for 3-D FPGAs under different 3-D fabrication technologies is proposed. Application of ... Keywords: 3-D integration, 3-D reconfigurable architectures, FPGAs, design framework, interconnection fabric

Kostas Siozios; Vasilis F. Pavlidis; Dimitrios Soudris

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Integration of a waveguide self-electrooptic effect device and a vertically coupled interconnect waveguide  

DOE Patents [OSTI]

A self-electrooptic effect device ("SEED") is integrated with waveguide interconnects through the use of vertical directional couplers. Light initially propagating in the interconnect waveguide is vertically coupled to the active waveguide layer of the SEED and, if the SEED is in the transparent state, the light is coupled back to the interconnect waveguide.

Vawter, G. Allen (Corrales, NM)

2008-02-26T23:59:59.000Z

362

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

480 kg/day natural gas reformation station. The table belowReciprocating gas compressor Electrolyzer Station: Thisfor reformer-type stations (natural gas), however, is more

Lipman, T E; Weinert, Jonathan X.

2006-01-01T23:59:59.000Z

363

Fuel Station Procedure Applicability All  

E-Print Network [OSTI]

Fuel Station Procedure Applicability All Last Revised 11/20/12 Procedure Owner Andrew Grant agrant for the purchasing and distribution of fuel for vehicles owned by Bowling Green State University (BGSU). This centralization is important to ensure compliance for BGSU employees who use the centralized fuel station and fuel

Moore, Paul A.

364

Station Costs Pinch Other Programs  

Science Journals Connector (OSTI)

...station. The overruns, encountered by Boeing Co. in its role as general contractor, mean...And he promised a skeptical panel that Boeing has the overruns under control...station. The overruns, encountered by Boeing Co. in its role as general contractor...

Andrew Lawler

1997-09-26T23:59:59.000Z

365

station locations | OpenEI  

Open Energy Info (EERE)

00 00 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142288500 Varnish cache server station locations Dataset Summary Description Alternative fueling stations are located throughout the United States and their availability continues to grow. The Alternative Fuels Data Center (AFDC) maintains a website where you can find alternative fuels stations near you or on a route, obtain counts of alternative fuels stations by state, Source Alternative Fuels Data Center Date Released December 13th, 2010 (4 years ago) Date Updated December 13th, 2010 (4 years ago) Keywords alt fuel alternative fuels alternative fuels stations biodiesel CNG compressed natural gas E85 Electricity ethanol

366

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

367

Geothermal Power and Interconnection: The Economics of Getting to Market  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power and Power and Interconnection: The Economics of Getting to Market David Hurlbut Technical Report NREL/TP-6A20-54192 April 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 Technical Report NREL/TP-6A20-54192 April 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

368

Impact of High Solar Penetration in the Western Interconnection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of High Solar Penetration Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Technical Report NREL/TP-5500-49667 December 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Prepared under Task No. SM101610

369

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

370

MHK Technologies/Ocean Powered Compressed Air Stations | Open Energy  

Open Energy Info (EERE)

Powered Compressed Air Stations Powered Compressed Air Stations < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Ocean Powered Compressed Air Stations.png Technology Profile Primary Organization Wave Power Plant Inc Technology Resource Click here Wave Technology Type Click here Point Absorber - Submerged Technology Readiness Level Click here TRL 4 Proof of Concept Technology Description The Ocean Powered Compressed Air Station is a point absorber that uses an air pump to force air to a landbased generator The device only needs 4m water depth and electricity production fluctations through storing energy at a constant air pressure Technology Dimensions Device Testing Date Submitted 13:16.5 << Return to the MHK database homepage Retrieved from

371

MHK Technologies/Jiangxia Tidal Power Station | Open Energy Information  

Open Energy Info (EERE)

Jiangxia Tidal Power Station Jiangxia Tidal Power Station < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Jiangxia Tidal Power Station.jpg Technology Profile Primary Organization China Guodian Corporation Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 9 Commercial Scale Production Application Technology Description There are 6 bulb turbine generator units operating in both ebb and flood tides with a total installed capacity up to 3 9 MW Technology Dimensions Technology Nameplate Capacity (MW) 3 9 Device Testing Date Submitted 14:15.7 << Return to the MHK database homepage Retrieved from "http://en.openei.org/w/index.php?title=MHK_Technologies/Jiangxia_Tidal_Power_Station&oldid=681601

372

GRR/Section 8-TX-b - ERCOT Interconnection | Open Energy Information  

Open Energy Info (EERE)

8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection Process.pdf Click to View Fullscreen Regulations & Policies PUCT Substantive Rule 25.198 Triggers None specified Click "Edit With Form" above to add content 8-TX-b - ERCOT Interconnection Process.pdf 8-TX-b - ERCOT Interconnection Process.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedures for interconnection with Electricity Reliability Council of Texas (ERCOT) in Texas. According to PUCT Substantive Rule 25.198, the responsibility for

373

Power System Study for Renewable Energy Interconnection in Malaysia  

Science Journals Connector (OSTI)

The renewable energy (RE) sector has grown exponentially in Malaysia with the introduction of the Feed-In-Tariff (FIT) by the Ministry of Energy, Green Technology and Water. Photovoltaic, biogas, biomass and mini hydro are among the renewable energy sources which offer a lucrative tariff to incite developers in taking the green technology route. In order to receive the FIT, a developer is required by the utility company to perform a power system analysis which will determine the technical feasibility of an RE interconnection to the utility company's existing grid system. There are a number of aspects which the analysis looks at, the most important being the load flow and fault levels in the network after the introduction of an RE source. The analysis is done by modelling the utility company's existing network and simulating the network with the interconnection of an RE source. The results are then compared to the values before an interconnection is made as well as ensuring the voltage rise or the increase in fault levels do not violate any pre-existing regulations set by the utility company. This paper will delve into the mechanics of performing a load flow analysis and examining the results obtained.

O F Askar; V K Ramachandaramurthy

2013-01-01T23:59:59.000Z

374

Corrosion of Metallic SOFC Interconnects in Coal Syngas  

SciTech Connect (OSTI)

With recent reductions in the operating temperature of Solid Oxide Fuel Cells (SOFC), the potential of using metallic interconnect has gone up. There is also an interest in using Coal syngas as the fuel gas and thus there is a need to analyze the behavior and performance of metallic interconnects when exposed to Coal syngas. Three high temperature material alloys, Crofer 22 APU, Ebrite and Haynes 230, having the potential to be used as SOFC interconnects were studied in simulated wet coal syngas. These alloys were exposed to syngas at 800 degrees C and for 100 hours. The exposure to coal syngas led to the formation of oxides and spinels, which evidently led to an increase in electrical resistance. Oxidation in a reducing and carburizing environment leads to unique phase and morphology formations. A comparative analysis was carried out for all the three alloys, wherein the samples were characterized by using SEM, EDS, Raman and X-Ray diffraction to obtain the morphology, thickness, composition and crystal structure of the oxides and spinels

Dastane, R.R. (University of West Virginia); Liu, X. (University of West Virginia); Johnson, C., Mao, Scott (University of Pittsburgh)

2007-09-01T23:59:59.000Z

375

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

4-12: Hydrogen Cost Comparison for Electrolysis Station Withthe hydrogen costs from the HSCM for electrolysis stations

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

376

Fuzzy Synthetic Evaluation of Gas Station Safety  

Science Journals Connector (OSTI)

Based on the comprehensive analysis of hazard factors and evaluation indexes in gas stations, gas station safety is assessed in a fuzzy synthetic ... comprehensive evaluation, the specific safety level of gas stations

Xiaohua Hao; Xiao Feng

2010-01-01T23:59:59.000Z

377

Alternative Fuels Data Center: Propane Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Stations to someone by E-mail Stations to someone by E-mail Share Alternative Fuels Data Center: Propane Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Propane Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Propane Fueling Stations on Google Bookmark Alternative Fuels Data Center: Propane Fueling Stations on Delicious Rank Alternative Fuels Data Center: Propane Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Propane Fueling Stations on AddThis.com... More in this section... Propane Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Propane Fueling Stations Photo of a liquefied petroleum gas fueling station. Thousands of liquefied petroleum gas (propane) fueling stations are

378

Monolithically interconnected GaAs solar cells: A new interconnection technology for high voltage solar cell output  

SciTech Connect (OSTI)

Photovoltaic linear concentrator arrays can benefit from high performance solar cell technologies being developed at AstroPower. Specifically, these are the integration of thin GaAs solar cell and epitaxial lateral overgrowth technologies with the application of monolithically interconnected solar cell (MISC) techniques. This MISC array has several advantages which make it ideal for space concentrator systems. These are high system voltage, reliable low cost monolithically formed interconnections, design flexibility, costs that are independent of array voltage, and low power loss from shorts, opens, and impact damage. This concentrator solar cell will incorporate the benefits of light trapping by growing the device active layers over a low-cost, simple, PECVD deposited silicon/silicon dioxide Bragg reflector. The high voltage-low current output results in minimal 12R losses while properly designing the device allows for minimal shading and resistance losses. It is possible to obtain open circuit voltages as high as 67 volts/cm of solar cell length with existing technology. The projected power density for the high performance device is 5 kW/m for an AMO efficiency of 26% at 1 5X. Concentrator solar cell arrays are necessary to meet the power requirements of specific mission platforms and can supply high voltage power for electric propulsion systems. It is anticipated that the high efficiency, GaAs monolithically interconnected linear concentrator solar cell array will enjoy widespread application for space based solar power needs. Additional applications include remote man-portable or ultra-light unmanned air vehicle (UAV) power supplies where high power per area, high radiation hardness and a high bus voltage or low bus current are important. The monolithic approach has a number of inherent advantages, including reduced cost per interconnect and increased reliability of array connections. There is also a high potential for a large number of consumer products.

Dinetta, L.C.; Hannon, M.H.

1995-10-01T23:59:59.000Z

379

Technical Analysis of the Hydrogen Energy Station Concept, Phase I and Phase II  

SciTech Connect (OSTI)

Phase I Due to the growing interest in establishing a domestic hydrogen infrastructure, several hydrogen fueling stations already have been established around the country as demonstration units. While these stations help build familiarity with hydrogen fuel in their respective communities, hydrogen vehicles are still several years from mass production. This limited number of hydrogen vehicles translates to a limited demand for hydrogen fuel, a significant hurdle for the near-term establishment of commercially viable hydrogen fueling stations. By incorporating a fuel cell and cogeneration system with a hydrogen fueling station, the resulting energy station can compensate for low hydrogen demand by providing both hydrogen dispensing and combined heat and power (CHP) generation. The electrical power generated by the energy station can be fed back into the power grid or a nearby facility, which in turn helps offset station costs. Hydrogen production capacity not used by vehicles can be used to support building heat and power loads. In this way, an energy station can experience greater station utility while more rapidly recovering capital costs, providing an increased market potential relative to a hydrogen fueling station. At an energy station, hydrogen is generated on-site. Part of the hydrogen is used for vehicle refueling and part of the hydrogen is consumed by a fuel cell. As the fuel cell generates electricity and sends it to the power grid, excess heat is reclaimed through a cogeneration system for use in a nearby facility. Both the electrical generation and heat reclamation serve to offset the cost of purchasing the equivalent amount of energy for nearby facilities and the energy station itself. This two-phase project assessed the costs and feasibility of developing a hydrogen vehicle fueling station in conjunction with electricity and cogenerative heat generation for nearby Federal buildings. In order to determine which system configurations and operational patterns would be most viable for an energy station, TIAX developed several criteria for selecting a representative set of technology configurations. TIAX applied these criteria to all possible technology configurations to determine an optimized set for further analysis, as shown in Table ES-1. This analysis also considered potential energy station operational scenarios and their impact upon hydrogen and power production. For example, an energy station with a 50-kWe reformer could generate enough hydrogen to serve up to 12 vehicles/day (at 5 kg/fill) or generate up to 1,200 kWh/day, as shown in Figure ES-1. Buildings that would be well suited for an energy station would utilize both the thermal and electrical output of the station. Optimizing the generation and utilization of thermal energy, hydrogen, and electricity requires a detailed look at the energy transfer within the energy station and the transfer between the station and nearby facilities. TIAX selected the Baseline configuration given in Table ES-1 for an initial analysis of the energy and mass transfer expected from an operating energy station. Phase II The purpose of this technical analysis was to analyze the development of a hydrogen-dispensing infrastructure for transportation applications through the installation of a 50-75 kW stationary fuel cell-based energy station at federal building sites. The various scenarios, costs, designs and impacts of such a station were quantified for a hypothetical cost-shared program that utilizes a natural gas reformer to provide hydrogen fuel for both the stack(s) and a limited number of fuel cell powered vehicles, with the possibility of using cogeneration to support the building heat load.

TIAX, LLC

2005-05-04T23:59:59.000Z

380

Locating PHEV Exchange Stations in V2G  

E-Print Network [OSTI]

Plug-in hybrid electric vehicles (PHEVs) are an environmentally friendly technology that is expected to rapidly penetrate the transportation system. Renewable energy sources such as wind and solar have received considerable attention as clean power options for future generation expansion. However, these sources are intermittent and increase the uncertainty in the ability to generate power. The deployment of PHEVs in a vehicle-to-grid (V2G) system provide a potential mechanism for reducing the variability of renewable energy sources. For example, PHEV supporting infrastructures like battery exchange stations that provide battery service to PHEV customers could be used as storage devices to stabilize the grid when renewable energy production is fluctuating. In this paper, we study how to best site these stations in terms of how they can support both the transportation system and the power grid. To model this problem we develop a two-stage stochastic program to optimally locate the stations prior to the realizat...

Pan, Feng; Berscheid, Alan; Izraelevitz, David

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

MHK Technologies/Float Wave Electric Power Station | Open Energy  

Open Energy Info (EERE)

Wave Electric Power Station Wave Electric Power Station < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Float Wave Electric Power Station.jpg Technology Profile Primary Organization Applied Technologies Company Ltd Technology Resource Click here Wave Technology Type Click here Point Absorber - Floating Technology Readiness Level Click here TRL 5 6 System Integration and Technology Laboratory Demonstration Technology Description The module of FWEPS is an oblong axisymmetrical capsule float which is located on the sea surface Inside the capsule there is a mechanical wave energy converter consisting of an oscillatory system and drive and an electric generator and energy accumulator Under the wave effect the capsule float and inner oscillatory system of the mechanical converter are in continuous oscillatory motion while the drive engaged with the system provides a continuous turn for the electric generator

382

Franklin Heating Station | Open Energy Information  

Open Energy Info (EERE)

Station Jump to: navigation, search Name: Franklin Heating Station Place: Minnesota References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility...

383

Energy Department Launches Alternative Fueling Station Locator...  

Broader source: Energy.gov (indexed) [DOE]

Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App November 7, 2013 - 11:16am Addthis As part of the Obama...

384

Hydrogen at the Fueling Station  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen) Service Stations 101 Hydrogen) Service Stations 101 Steven M. Schlasner September 22, 2004 2 DISCLAIMER Opinions expressed within are strictly those of the presenter and do not necessarily represent ConocoPhillips Company. 3 Presentation Outline * Introduction to ConocoPhillips * Introduction to Service Stations * Comparison of Conventional with Hydrogen Fueling Stations * Hydrogen Fueling Life Cycle * Practical Design Example * Concluding Observations 4 ConocoPhillips * 7 th on Fortune's list of largest companies (2003 revenues) * 3 rd largest integrated petroleum company in U.S. * 1 st (largest) petroleum refiner in U.S. * 14,000 retail outlets (350 company-owned) in 44 states * Brands: Conoco, Phillips 66, 76 * 32,800 miles pipeline, owned or interest in * 64 terminals: crude, LPG, refined products

385

Pilgrim Station | Open Energy Information  

Open Energy Info (EERE)

Station Station Jump to: navigation, search Name Pilgrim Station Facility Pilgrim Stage Station Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner ReunionPower/Exergy Developer Exergy Location Twin Falls County ID Coordinates 42.741336°, -114.865865° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.741336,"lon":-114.865865,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

386

Mini cogeneration stations: Foreign experience  

Science Journals Connector (OSTI)

The prospects of using autonomous power and heat supply systems are analyzed. The economic advantages of mini cogeneration power stations equipped with gas piston, diesel, or gas turbine units are shown. Examples...

V. R. Kotler

2006-08-01T23:59:59.000Z

387

Electric power from offshore wind via synoptic-scale interconnection  

Science Journals Connector (OSTI)

...hub-height of modern offshore wind turbines. Our extrapolation...output of an offshore turbine at each selected station with wind speed measurements...Practical commercial offshore wind developments...minimum of 100 turbines at each location...

Willett Kempton; Felipe M. Pimenta; Dana E. Veron; Brian A. Colle

2010-01-01T23:59:59.000Z

388

RAPID/Geothermal/Transmission Siting & Interconnection/Texas...  

Open Energy Info (EERE)

Electric Power Transmission PUCT - Procedure for Certifying Renewable Energy Credit Generators PUCT - Registration Form for Power Generation Companies and Self-Generators PUCT DG...

389

DOE Permitting Hydrogen Facilities: Hydrogen Fueling Stations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Stations Stations Public-use hydrogen fueling stations are very much like gasoline ones. In fact, sometimes, hydrogen and gasoline cars can be fueled at the same station. These stations offer self-service pumps, convenience stores, and other services in high-traffic locations. Photo of a Shell fueling station showing the site convenience store and hydrogen and gasoline fuel pumps. This fueling station in Washington, D.C., provides drivers with both hydrogen and gasoline fuels Many future hydrogen fueling stations will be expansions of existing fueling stations. These facilities will offer hydrogen pumps in addition to gasoline or natural gas pumps. Other hydrogen fueling stations will be "standalone" operations. These stations will be designed and constructed to

390

Novel Composite Materials for SOFC Cathode-Interconnect Contact  

SciTech Connect (OSTI)

This report summarized the research efforts and major conclusions of our University Coal Research Project, which focused on developing a new class of electrically-conductive, Cr-blocking, damage-tolerant Ag-perovksite composite materials for the cathode-interconnect contact of intermediate-temperature solid oxide fuel cell (SOFC) stacks. The Ag evaporation rate increased linearly with air flow rate initially and became constant for the air flow rate {ge} {approx} 1.0 cm {center_dot} s{sup -1}. An activation energy of 280 KJ.mol{sup -1} was obtained for Ag evaporation in both air and Ar+5%H{sub 2}+3%H{sub 2}O. The exposure environment had no measurable influence on the Ag evaporation rate as well as its dependence on the gas flow rate, while different surface morphological features were developed after thermal exposure in the oxidizing and reducing environments. Pure Ag is too volatile at the SOFC operating temperature and its evaporation rate needs to be reduced to facilitate its application as the cathode-interconnect contact. Based on extensive evaporation testing, it was found that none of the alloying additions reduced the evaporation rate of Ag over the long-term exposure, except the noble metals Au, Pt, and Pd; however, these noble elements are too expensive to justify their practical use in contact materials. Furthermore, the addition of La{sub 0.8}Sr{sub 0.2}MnO{sub 3} (LSM) into Ag to form a composite material also did not significantly modify the Ag evaporation rate. The Ag-perovskite composites with the perovskite being either (La{sub 0.6}Sr{sub 0.4})(Co{sub 0.8}Fe{sub 0.2})O{sub 3} (LSCF) or LSM were systematically evaluated as the contact material between the ferritic interconnect alloy Crofer 22 APU and the LSM cathode. The area specific resistances (ASRs) of the test specimens were shown to be highly dependent on the volume percentage and the type of the perovskite present in the composite contact material as well as the amount of thermal cycling that the specimens were subjected to during testing. The Ag-LSCF composite contact materials proved more effective in trapping Cr within the contact material and preventing Cr migration into the cathode than the Ag-LSM composites. Ag-perovskite composite contact materials are promising candidates for use in intermediate-temperature SOFC stacks with ferritic stainless steel interconnects due to their ability to maintain acceptably low ASRs while reducing Cr migration into the cathode material.

J. H. Zhu

2009-07-31T23:59:59.000Z

391

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

SciTech Connect (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

392

Energy Requirement and Speed Analysis of Electrical and Free-Space Optical Digital Interconnections  

Science Journals Connector (OSTI)

Scaling of VLSI technology has been dramatically increasing microelectronic device densities and speeds. However, the interconnection technology between devices does not advance proportionally. Limited available ...

Gke I. Yayla; Philippe J. Marchand

1998-01-01T23:59:59.000Z

393

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2010-01-01T23:59:59.000Z

394

Synchrotron X-Ray Microdiffraction Studies of Electromigration in Interconnect lines at the Advanced Light Source  

E-Print Network [OSTI]

in Confined Metal Lines, Journal of Applied Physics, 73 (in passivated metal lines, Applied Physics Letters, 81 (aluminum interconnect lines with X-ray micro- diffraction,

Tamura, Nobumichi

2009-01-01T23:59:59.000Z

395

Optical Digital Audio Interconnect Based on Organic Light Emitting Diodes and Organic Photodiodes  

Science Journals Connector (OSTI)

An optical interconnect using solely organic optoelectronic components is presented. Careful optimization of the organic light emitting diodes and photodiodes allows us to successfully...

Valouch, Sebastian; Punke, Martin; Kettlitz, Siegfried W; Lemmer, Uli; Gerken, Martina

396

Electrical isolation of component cells in monolithically interconnected modules  

DOE Patents [OSTI]

A monolithically interconnected photovoltaic module having cells which are electrically connected which comprises a substrate, a plurality of cells formed over the substrate, each cell including a primary absorber layer having a light receiving surface and a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, and a cell isolation diode layer having a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, the diode layer intervening the substrate and the absorber layer wherein the absorber and diode interfacial regions of a same conductivity type orientation, the diode layer having a reverse-breakdown voltage sufficient to prevent inter-cell shunting, and each cell electrically isolated from adjacent cells with a vertical trench trough the pn-junction of the diode layer, interconnects disposed in the trenches contacting the absorber regions of adjacent cells which are doped an opposite conductivity type, and electrical contacts.

Wanlass, Mark W. (Golden, CO)

2001-01-01T23:59:59.000Z

397

Analysis of the fuel efficiency of gas-turbine cogeneration stations  

Science Journals Connector (OSTI)

A technique for evaluating the fuel efficiency of the combined generation of electricity and heat at a gas-turbine cogeneration station is presented. The effects the regeneration degree of the gas-turbine cycle a...

V. I. Evenko; A. S. Strebkov

2006-10-01T23:59:59.000Z

398

Elements of an advanced integrated operator control station  

SciTech Connect (OSTI)

One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures.

Clarke, M.M.; Kreifeldt, J.G.

1984-01-01T23:59:59.000Z

399

Elements of an advanced integrated operator control station  

SciTech Connect (OSTI)

One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures.

Clarke, M.M.; Kreifeldt, J.G.

1984-01-01T23:59:59.000Z

400

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

e.g. co-locate with gasoline station, bus-yard, or officeintegrated into existing gasoline stations with 8 dispensersof a liquid H 2 and gasoline station layout. Figure 4-9:

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

located at an existing gasoline station. One could use othere.g. co-locate with gasoline station, bus-yard, or officeequivalent to about 6% of gasoline stations in California 4.

Lipman, T E; Weinert, Jonathan X.

2006-01-01T23:59:59.000Z

402

Mobile Alternative Fueling Station Locator  

SciTech Connect (OSTI)

The Department of Energy's Alternative Fueling Station Locator is available on-the-go via cell phones, BlackBerrys, or other personal handheld devices. The mobile locator allows users to find the five closest biodiesel, electricity, E85, hydrogen, natural gas, and propane fueling sites using Google technology.

Not Available

2009-04-01T23:59:59.000Z

403

University of Washington Seismograph Stations  

Science Journals Connector (OSTI)

...MEMBERSHIP COHM ITTEE Ross R. Heinrich...n~bers and changes or address should...seismograms, (2) a world-wide...Utah a 0.3 Bonneville lake beds Scoresbysund...Alaska 1.1 2.0 Graywacke...Stores, 221 North Grand Boulevard...SEISM and the name of the station...day of month (2) ml n2 sl s2...

404

PowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks  

E-Print Network [OSTI]

. Cooling costs can be pro- hibitive (consider the high power budgets of industry-standard six- foot serverPowerHerd: Dynamic Satisfaction of Peak Power Constraints in Interconnection Networks Li Shang Li,peh,jha}@ee.princeton.edu Niraj K. Jha ABSTRACT Power consumption is a critical issue in interconnection network design, driven

Shang, Li

405

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line- based communication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Wu, Hui

406

Predictions, Challenges, and Opportunities in CMOS Compatible On-Chip Optical Interconnect  

E-Print Network [OSTI]

to a few picoseconds. IV. ELECTRICAL VS. OPTICAL INTERCONNECTS Different criteria used in the design of the . Friedman Department of Electrical and Computer Engineering University of Rochester, Rochester, New York for electrical interconnect. Predictions of the performance of CMOS compatible optical devices are made based

Friedman, Eby G.

407

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores  

E-Print Network [OSTI]

Testing for Interconnect Crosstalk Defects Using On-Chip Embedded Processor Cores Li Chen on long interconnects and must be addressed during manufacturing testing. External testing for crosstalk is expensive due to the need for high-speed testers. Built-in self-test, while eliminating the need for a high

California at San Diego, University of

408

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link  

E-Print Network [OSTI]

Extraction and Modeling of the Optoelectronic Characteristics of an Optical Interconnect Link a technique that enables the extraction and modeling of some of the channel's optoelectronic characteristics and optoelectronic com- ponents utilized in the link. 1. Introduction In the last decade optical interconnects have

Esener, Sadik C.

409

The Impact of Dynamic Directories on Multicore Interconnects MATT SCHUCHHARDT, Northwestern University  

E-Print Network [OSTI]

consumption by up to 37.3% (22.9% on average for scientific workloads, and 8.0% for Map-Reduce). 1 Directories on the performance, power, and energy consumption of a multicore processor. We show its. This eliminates a large fraction of on-chip interconnect traversals, thus reducing interconnect power and energy

Kuzmanovic, Aleksandar

410

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line-based commu- nication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Huang, Michael C.

411

Geothermal Power and Interconnection: The Economics of Getting to Market  

SciTech Connect (OSTI)

This report provides a baseline description of the transmission issues affecting geothermal technologies. The report begins with a comprehensive overview of the grid, how it is planned, how it is used, and how it is paid for. The report then overlays onto this 'big picture' three types of geothermal technologies: conventional hydrothermal systems; emerging technologies such as enhanced engineered geothermal systems (EGS) and geopressured geothermal; and geothermal co-production with existing oil and gas wells. Each category of geothermal technology has its own set of interconnection issues, and these are examined separately for each. The report draws conclusions about each technology's market affinities as defined by factors related to transmission and distribution infrastructure. It finishes with an assessment of selected markets with known geothermal potential, identifying those that offer the best prospects for near-term commercial development and for demonstration projects.

Hurlbut, D.

2012-04-01T23:59:59.000Z

412

Catalytic bipolar interconnection plate for use in a fuel cell  

DOE Patents [OSTI]

A bipolar interconnection plate for use between adjacent fuel cell units in a stacked fuel cell assembly. Each plate is manufactured from an intermetallic composition, examples of which include NiAl or Ni.sub.3 Al which can catalyze steam reforming of hydrocarbons. Distributed within the intermetallic structure of the plate is a ceramic filler composition. The plate includes a first side with gas flow channels therein and a second side with fuel flow channels therein. A protective coating is applied to the first side, with exemplary coatings including strontium-doped or calcium-doped lanthanum chromite. To produce the plate, Ni and Al powders are combined with the filler composition, compressed at a pressure of about 10,000-30,000 psi, and heated to about 600.degree.-1000.degree. C. The coating is then applied to the first side of the completed plate using liquid injection plasma deposition or other deposition techniques.

Lessing, Paul A. (Idaho Falls, ID)

1996-01-01T23:59:59.000Z

413

Gold-based electrical interconnections for microelectronic devices  

DOE Patents [OSTI]

A method of making an electrical interconnection from a microelectronic device to a package, comprising ball or wedge compression bonding a gold-based conductor directly to a silicon surface, such as a polysilicon bonding pad in a MEMS or IMEMS device, without using layers of aluminum or titanium disposed in-between the conductor and the silicon surface. After compression bonding, optional heating of the bond above 363 C. allows formation of a liquid gold-silicon eutectic phase containing approximately 3% (by weight) silicon, which significantly improves the bond strength by reforming and enhancing the initial compression bond. The same process can be used for improving the bond strength of Au--Ge bonds by forming a liquid Au-12Ge eutectic phase.

Peterson, Kenneth A. (Albuquerque, NM); Garrett, Stephen E. (Albuquerque, NM); Reber, Cathleen A. (Corrales, NM); Watson, Robert D. (Tijeras, NM)

2002-01-01T23:59:59.000Z

414

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings  

Broader source: Energy.gov (indexed) [DOE]

37: Interconnection of the Buffalo Ridge III Wind Project, 37: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota Summary This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE's Western Area Power Administration transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 29, 2012 EIS-0437: Notice of Cancellation of an Environmental Impact Statement Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD

415

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project,  

Broader source: Energy.gov (indexed) [DOE]

8: Interconnection of the Proposed Hermosa West Wind Farm 8: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY SUMMARY This EIS will evaluate the environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, with DOE's Western Area Power Administration's existing Craig-Ault 345-kilovolt transmission line. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY January 14, 2010 EIS-0438: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Meetings

416

Optimal command generation for maneuvering the space station  

E-Print Network [OSTI]

with linearly appearing bounded controls. It was shown that on average, the run time for the control eliminated differential inclusion method was one-sixth that of the collocation method. ' One method y'ves a higher accuracy, while the other gives faster... and positive in the direction of vehicle motion. The z-axis points to the nadir, and the y-axis is normal to the orbit plane and completes the right-handed orthogonal system. 15 This can be seen in Figure 2. 2. The angular velocity of LVLH relative...

Bryson, Amy Louise

2012-06-07T23:59:59.000Z

417

Re: Potomac River Generating Station Department of Energy, Case...  

Broader source: Energy.gov (indexed) [DOE]

on January 31 Order, Pepco will provide advance notification of the outages to Mirant, PJM, the Department of Energy ("Department"), the Federal Energy Regulatory Commission, the...

418

Steam Power Stations for Electricity and Heat Generation  

Science Journals Connector (OSTI)

Power plants produce electricity, process heat or district heating, according to their task (Stultz and Kitto 1992). Electric power is the only product of a condensation power plant and the main product of a p...

Dr. Hartmut Spliethoff

2010-01-01T23:59:59.000Z

419

NMAC 17.9.569 Interconnection of Generating Facilities with a...  

Open Energy Info (EERE)

Abstract This rule applies to every electric utility including rural electric cooperatives and investor-owned utilities within the state of New Mexico that is subject to the...

420

Design semiconducting nanowires as interconnects in a new generation of nanoelectronics  

E-Print Network [OSTI]

be achieved by using tetrazine molecules as linkers · Glen P. Miller, Shinya Okano, and David Tománek, Toward: Center for High-Rate Nanomanufacturing Nanowires containig: biphenyl linkers: tetrazine linkers: Charge

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Effects of Oxide Thickness on Scale and Interface Stresses under Isothermal Cooling and Micro-Indentation for Ferritic Stainless Steel Interconnect  

SciTech Connect (OSTI)

Interconnects in solid oxide fuel cells (SOFCs) provide the electrical connection between the individual cells, as well as separate the anode air from the cathode fuel for each cell. The recently developed anode-supported planar SOFCs design allows the cell working temperature to be 800oC and lower, which led to the proposed use of ferritic stainless steel as interconnects and current collectors in the SOFC systems. Many experimental studies have shown that metal based interconnects will go through surface oxidation under the typical operating temperature and environment of an SOFC system. Since the oxide scale is formed at the outer surface of interconnect, its microstructure (morphology, texture), properties (electrical, thermal and mechanical properties), and structural integrity/stability will have a significant impact on the performance of interconnect. In this paper, we study the oxide growth kinetics and stresses generated during scale growth the thermal cycling for Cr-Fe based alloy, e.g. Crofer 22 APU. The goal is to predict the interconnect life under typical operating conditions and thermal cycles. First, a mathematical model is developed based on the growth of scale and coupling relation between diffusion and stress field. The following phenomena are considered: 1) The predominant cationic diffusion and cation distribution within the oxide scale in transient state and steady state; 2) Chemical reaction within the scale as well as the growth kinetics of the oxide scale; 3) Stresses distribution during the oxidation, especially for mid- and long-term treatment; 4) Coupling relationship or interaction between oxidation induced stresses and mass diffusion within the scale. Next, thermal stresses generated due to temperature changes in thermal cycling are predicted using finite element analyses for different substrate and scale thickness. In general, very high compressive in-plane stresses are predicted for the oxide layer. Also, high shear stress is also predicted on the oxide/substrate interface. The predicted shear stress on the interface is used to compare with the experimentally determined bond strength to predict delamination. Finally, scale spallation and IC life prediction are predicted by comparing the compressive stress in the scale with the critical buckling load for the delaminated scale.

Sun, Xin; Liu, Wenning N.; Vetrano, John S.; Yang, Zhenguo; Recknagle, Kurtis P.; Khaleel, Mohammad A.

2007-01-30T23:59:59.000Z

422

alternative fuels stations | OpenEI  

Open Energy Info (EERE)

fuels stations fuels stations Dataset Summary Description Alternative fueling stations are located throughout the United States and their availability continues to grow. The Alternative Fuels Data Center (AFDC) maintains a website where you can find alternative fuels stations near you or on a route, obtain counts of alternative fuels stations by state, Source Alternative Fuels Data Center Date Released December 13th, 2010 (4 years ago) Date Updated December 13th, 2010 (4 years ago) Keywords alt fuel alternative fuels alternative fuels stations biodiesel CNG compressed natural gas E85 Electricity ethanol hydrogen liquefied natural gas LNG liquefied petroleum gas LPG propane station locations Data text/csv icon alt_fuel_stations_apr_4_2012.csv (csv, 2.3 MiB) Quality Metrics Level of Review Peer Reviewed

423

Alternative Fueling Station Locator | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alternative Fueling Station Locator Alternative Fueling Station Locator Alternative Fueling Station Locator Find Stations Plan a Route Location: Go Start: End: Go Fuel: All Fuels Biodiesel (B20 and above) Compressed Natural Gas Electric Ethanol (E85) Hydrogen Liquefied Natural Gas (LNG) Liquefied Petroleum Gas (Propane) more search options close × More Search Options Include private stations Include planned stations Owner All Private Federal State Local Utility Payment All American Express Discover MasterCard VISA Cash Checks CFN Clean Energy Fuel Man Gas Card PHH Services Voyager WEX Electric charger types Include level 1 Include level 2 Include DC fast Include legacy chargers Limit results to within 5 miles Limit results to within 5 miles 12,782 alternative fuel stations in the United States Excluding private stations

424

Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (7/25/03)  

Broader source: Energy.gov (indexed) [DOE]

Summit/Westward Project Summit/Westward Project July 2003 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan

425

DOE/EIS-0183 Record of Decision for the Electrical Interconnection of the Kittitas Valley Wind Project (09/04/09)  

Broader source: Energy.gov (indexed) [DOE]

Kittitas Valley Wind Project Kittitas Valley Wind Project September 2009 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 108 megawatts (MW) of power to be generated by the proposed Kittitas Valley Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Sagebrush Power Partners, LLC (Sagebrush) has received authorization from the Washington Energy Facility Site Evaluation Council (EFSEC) to construct and operate the proposed Wind Project in Kittitas County, Washington, and has requested interconnection to the FCRTS on BPA's Columbia-Covington 230-kV transmission line in the vicinity of Ellensburg, Washington. BPA will construct a new substation to accommodate this additional power into the

426

7.1.1. Fernbahnhof / Rail Station  

E-Print Network [OSTI]

.1.1.4.7 Gasversorgung des Fernbahnhofs / Gas Supply of Rail Station 7.1.1.4.7.1 Gasversorgung des Fernbahnhofs 77.1.1. Fernbahnhof / Rail Station 7.1.2. ?PNV-Bahnhof / Public Transport Station 7.1.3. Busbahnhof / Bus Station 7.1.4. Taxianlagen / Taxi Stand 7.1.5. Sonstige Passagiergebäude / Other passenger

Berlin,Technische Universität

427

International Space Station Program Overview  

E-Print Network [OSTI]

International Space Station Program Overview 1 #12;BerthingDock MRM1 / FGB Nadir DC1 / MLM / RS Node SM Aft MRM2 / SM-Zenith Node 1 Nadir Node 2 Nadir Node 2 Zenith 2013 2014 2015 May Jun Jul Aug Sep the line (Dock on 5/1/13) HTV4 (7/20/13 ­ 8/19/13) Pre-Decisional, For Internal Use Only Date Color Key

428

The Fuel-Travel-Back Approach to Hydrogen Station Siting  

E-Print Network [OSTI]

the experience of gasoline stations. Driven by the notion "percentages of existing gasoline stations, for a successfulsubset of the existing gasoline station network [14]. These

Lin, Zhenhong; Ogden, Joan; Fan, Yueyue; Chen, Chien-Wei

2009-01-01T23:59:59.000Z

429

p r o g r e s s r e p o r t s Interconnect: A Fundamental Constraint  

E-Print Network [OSTI]

the greatest amounts of area, delay, and energy. With interconnection require- ments scaling faster than. Since typical, logical communication structures have interconnection demands that are greater than two-dimensional VLSI substrates naturally sup- port, interconnection requirements grow faster than logic and become

Haile, Sossina M.

430

Lowry Range Solar Station: Arapahoe County, Colorado (Data)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Yoder, M.; Andreas, A.

431

Nevada Power: Clark Station; Las Vegas, Nevada (Data)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

432

MHK Technologies/Vert Network Power Station | Open Energy Information  

Open Energy Info (EERE)

Network Power Station Network Power Station < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Vert Network Power Station.jpg Technology Profile Primary Organization Vert Labs LLP Technology Type Click here Point Absorber - Floating Technology Readiness Level Click here TRL 4 Proof of Concept Technology Description Vert Network is 1st cost effective wave power system that brings profit with the current level of pricing for renewable electricity The technology of Vert Network is based on an array of plastic floats that produce compressed air from the torque that is created from levers attached to the floats The compressed air is then sent to the shore by rubber pipe which is significantly cheaper and easier to maintain than underwater copper cables Consequently the generation is done on land using a standard turbine generator rather than requiring highly bespoke and overly robust generation devices which have to be specially designed for the marine environment and require specialist skills to maintain The marine based device is therefore made entirely from plastic carbon fibre and rubber so all the components are made from standard materials using mouldings and can be produced very cheaply VERT Labs estimates show that it can provide electricity at about 0 10 kWh When VERT Labs reache

433

Study of metallic materials for solid oxide fuel cell interconnect applications.  

SciTech Connect (OSTI)

Metallic interconnect acts as a gas separator and a gas distributor and therefore, it needs to function adequately in two widely different environments. The interconnect material will be exposed to air on one side and natural gas or coal-derived synthesis gas on the other side. The viable material for the interconnect application must be resistant not only to oxidation but also carburization in hydrocarbon containing low-oxygen environments. In addition, the scales that develop on the exposed surfaces must possess adequate electrical conductivity for them to function as current leads over long service life of the fuel cell. This report addresses five topics of interest for the development of metallic interconnects with adequate performance in fuel cells for long service life. The research conducted over the years and the conclusions reached were used to identify additional areas of research on materials for improved performance of components, especially metallic interconnects, in the complex fuel cell environments. This report details research conducted in the following areas: measurement of area specific electrical resistivity, corrosion performance in dual gas environments by experiments using alloy 446, long term corrosion performance of ferritic and austenitic alloys in hydrogen and methane-reformed synthesis fuel-gas environments, approaches to reduce the area resistance of metallic interconnect, and reduction of electrical resistivity of alumina scales on metallic interconnect. Based on the key requirements for metallic interconnects and the data developed on the corrosion behavior of candidate materials in meeting those requirements, several areas are recommended for further research to develop metallic interconnects with acceptable and reliable long-term performance in solid oxide fuel cells.

Natesan, K.; Zeng, Z.; Nuclear Engineering Division

2009-04-24T23:59:59.000Z

434

Degradation of solid oxide fuel cell metallic interconnects in fuels containing sulfur  

SciTech Connect (OSTI)

Hydrogen is the main fuel for all types of fuel cells except direct methanol fuel cells. Hydrogen can be generated from all manner of fossil fuels, including coal, natural gas, diesel, gasoline, other hydrocarbons, and oxygenates (e.g., methanol, ethanol, butanol, etc.). Impurities in the fuel can cause significant performance problems and sulfur, in particular, can decrease the cell performance of fuel cells, including solid oxide fuel cells (SOFC). In the SOFC, the high (800-1000C) operating temperature yields advantages (e.g., internal fuel reforming) and disadvantages (e.g., material selection and degradation problems). Significant progress in reducing the operating temperature of the SOFC from ~1000 C to ~750 C may allow less expensive metallic materials to be used for interconnects and as balance of plant (BOP) materials. This paper provides insight on the material performance of nickel, ferritic steels, and nickel-based alloys in fuels containing sulfur, primarily in the form of H2S, and seeks to quantify the extent of possible degradation due to sulfur in the gas stream.

Ziomek-Moroz, M.; Hawk, Jeffrey A.

2005-01-01T23:59:59.000Z

435

Alternative Fueling Station Locations | OpenEI  

Open Energy Info (EERE)

Alternative Fueling Station Locations Alternative Fueling Station Locations Dataset Summary Description Alternative fueling stations are located throughout the United States and their availability continues to grow. The Alternative Fuels Data Center (AFDC) maintains a website where you can find alternative fuels stations near you or on a route, obtain counts of alternative fuels stations by state, view U.S. maps, and more. Access up-to-date fuel station data here: http://www.afdc.energy.gov/afdc/data_download The dataset available for download here provides a "snapshot" of the alternative fueling station information for: compressed natural gas (CNG), E85 (85% ethanol, 15% gasoline), propane/liquefied petroleum gas (LPG), biodiesel, electricity, hydrogen, and liquefied natural gas

436

Alternative Fueling Station Locator | Open Energy Information  

Open Energy Info (EERE)

Alternative Fueling Station Locator Alternative Fueling Station Locator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Alternative Fueling Station Locator Agency/Company /Organization: United States Department of Energy Partner: National Renewable Energy Laboratory Sector: Energy Focus Area: Fuels & Efficiency, Transportation Phase: Evaluate Options, Prepare a Plan Topics: Datasets Resource Type: Online calculator User Interface: Website Website: www.afdc.energy.gov/afdc/locator/stations/ Web Application Link: www.afdc.energy.gov/afdc/locator/stations/ Cost: Free OpenEI Keyword(s): Featured References: National Renewable Energy Laboratory Advanced Vehicles and Fuels Research: Data and Resources[1] Logo: Alternative Fueling Station Locator The alternative fuel station locator uses an address based search to find

437

Pipeline compressor station construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for pipeline compressor station construction costs by analysing individual compressor station cost components using historical compressor station cost data between 1992 and 2008. Distribution and share of these pipeline compressor station cost components are assessed based on compressor station capacity, year of completion, and locations. Average unit costs in material, labour, miscellaneous, land, and total costs are $866/hp, $466/hp, $367/hp, $13/hp, and $1,712/hp, respectively. Primary costs for compressor stations are material cost, approximately 50.6% of the total cost. This study conducts a learning curve analysis to investigate the learning rate of material and labour costs for different groups. Results show that learning rates and construction component costs vary by capacity and locations. This study also investigates the causes of pipeline compressor station construction cost differences. [Received: March 25, 2012; Accepted; 20 February 2013

Yipeng Zhao; Zhenhua Rui

2014-01-01T23:59:59.000Z

438

The effect of precooling inlet air on CHP efficiency in natural gas pressure reduction stations  

Science Journals Connector (OSTI)

Almost all pressure reduction stations in Iran use expansion valves to reduce the natural gas pressure, which leads to wasting large amount of exergy. In this paper, a system is proposed which includes the modification of a conventional pressure reduction station with the addition of a turbo expander and a gas turbine for power recovery and generation. The next step is investigating the effect of heat exchanger on proposed combined heat and power system. The objective of the simulation is first to investigate the effects of modifying components performance equations on system efficiency and performance at a set operating condition. Secondly, to conduct feasibility study of using a heat exchanger at gas pressure reduction station to boost station efficiency in terms of energy saving and economic value. The result demonstrates that by precooling inlet air of gas turbine, station efficiency increases specially when the turbine works at full load.

Mahyar Kargaran; Mahmoood Farzaneh-Grod; Mohammad Saberi

2013-01-01T23:59:59.000Z

439

Pulsed laser planarization of metal films for multilevel interconnects  

SciTech Connect (OSTI)

Multilevel interconnect schemes for integrated circuits generally require one or more planarization steps, in order to maintain an acceptably flat topography for lithography and thin-film step coverage on the higher levels. Traditional approaches have involved planarization of the interlevel insulation (dielectric) layers, either by spin-on application (e.g., polyimide), or by reflow (e.g., phosphosilicate glass). We have pursued an alternative approach, in which each metal level is melted (hence planarized) using a pulsed laser prior to patterning. Short (approx.1 ..mu..s) pulses are used to preclude undesirable metallurgical reactions between the film, adhesion or barrier layer, and dielectric layer. Laser planarization of metals is particularly well suited to multilevel systems which include ground or power planes. Results are presented for planarization of gold films on SiO/sub 2/ dielectric layers using a flashlamp-pumped dye laser. The pulse duration is approx.1 ..mu..s, which allows the heat pulse to uniformly penetrate the gold while not penetrating substantially through the underlying SiO/sub 2/ (hence not perturbing the lower levels of metal). Excellent planarization of the gold films is achieved (less than 0.1 ..mu..m surface roughness, even starting with extreme topographic variations), as well as improved conductivity. To demonstrate the process, numerous planarized two-layer structures (transmission lines under a ground plane) were fabricated and characterized. 9 refs., 2 figs.

Tuckerman, D.B.; Schmitt, R.L.

1985-05-01T23:59:59.000Z

440

Taipei terminal rail station : casting an urban gateway  

E-Print Network [OSTI]

Access is a key issue in the design of railway stations. The evolution of the train station typology, has resulted in many types of stations based on the development of the stations' access. Since rail travel on a larger ...

Tsai, May Deanna

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Timber Mountain Precipitation Monitoring Station  

SciTech Connect (OSTI)

A precipitation monitoring station was placed on the west flank of Timber Mountain during the year 2010. It is located in an isolated highland area near the western border of the Nevada National Security Site (NNSS), south of Pahute Mesa. The cost of the equipment, permitting, and installation was provided by the Environmental Monitoring Systems Initiative (EMSI) project. Data collection, analysis, and maintenance of the station during fiscal year 2011 was funded by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office Environmental Restoration, Soils Activity. The station is located near the western headwaters of Forty Mile Wash on the Nevada Test and Training Range (NTTR). Overland flows from precipitation events that occur in the Timber Mountain high elevation area cross several of the contaminated Soils project CAU (Corrective Action Unit) sites located in the Forty Mile Wash watershed. Rain-on-snow events in the early winter and spring around Timber Mountain have contributed to several significant flow events in Forty Mile Wash. The data from the new precipitation gauge at Timber Mountain will provide important information for determining runoff response to precipitation events in this area of the NNSS. Timber Mountain is also a groundwater recharge area, and estimation of recharge from precipitation was important for the EMSI project in determining groundwater flowpaths and designing effective groundwater monitoring for Yucca Mountain. Recharge estimation additionally provides benefit to the Underground Test Area Sub-project analysis of groundwater flow direction and velocity from nuclear test areas on Pahute Mesa. Additionally, this site provides data that has been used during wild fire events and provided a singular monitoring location of the extreme precipitation events during December 2010 (see data section for more details). This letter report provides a summary of the site location, equipment, and data collected in fiscal year 2011.

Lyles Brad,McCurdy Greg,Chapman Jenny,Miller Julianne

2012-01-01T23:59:59.000Z

442

Exergoeconomic Evaluation of Desalinated Water Production in Pipeline Gas Station  

Science Journals Connector (OSTI)

Abstract Pipelines transporting gas often are thousands of kilometers long, a number of compressor stations are needed, which consume a significant amount of energy. To improve the efficiency of the compressor stations, the high temperature exhaust gases from the gas turbines which drive the compressors are used for producing steam or other motive fluid in a heat recovery steam generator (HRSG). The steam or other vapor is then used to drive a turbine, which in turn drives other compressors or other applications. This paper is to discuss the techno-economic evaluation of different desalination process using the exhaust of 25 MW gas turbine in gas station. MED, MSF and RO desalination systems have been considered. Nadoshan pipeline gas stations with 25 MW gas turbine drivers in Iran were considered as a case study. In this regard, the simulation has been performed in Thermoflex Software. Moreover, the computer code has been developed for thermodynamic simulation and exergoeconomic analysis. Finally, different scenarios have been evaluated and comprised in view of economic, exergetic and exergoeconomic.

M.H. Khoshgoftar Manesh; S. Khamis Abadi; H. Ghalami; M. Amidpour

2012-01-01T23:59:59.000Z

443

Intelligent Voltage and Reactive Power Control of Mini-Hydro Power Stations for Maximisation of Real  

E-Print Network [OSTI]

of a Mini-Hydro Power Generator to the Rural Grid The UK distribution network has been significantly exten1 Intelligent Voltage and Reactive Power Control of Mini-Hydro Power Stations for Maximisation Control (APFC) modes. The ability to export active and reactive power from mini-hydro power generators

Harrison, Gareth

444

Analysis of the Use of Wind Energy to Supplement the Power Needs at McMurdo Station and Amundsen-Scott South Pole Station, Antarctica (Poster)  

SciTech Connect (OSTI)

This poster summarizes the analysis of the inclusion of wind-driven power generation technology into the existing diesel power plants at two U.S. Antarctic research stations, McMurdo and Amundsen-Scott South Pole Station. Staff at the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) conducted the analysis. Available data were obtained on the wind resources, power plant conditions, load, and component cost. We then used NREL's Hybrid2 power system modeling software to analyze the potential and cost of using wind turbine generators at the two aforementioned facilities.

Baring-Gould, E. I.; Robichaud, R.; McLain, K.

2005-05-01T23:59:59.000Z

445

City of Alexandria's Application for Rehearing | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No....

446

Reliable low latency I/O in torus-based interconnection networks  

E-Print Network [OSTI]

In today's high performance computing environment I/O remains the main bottleneck in achieving the optimal performance expected of the ever improving processor and memory technologies. Interconnection networks therefore combines processing units...

Azeez, Babatunde

2007-04-25T23:59:59.000Z

447

An energy vision: the transformation towards sustainability --interconnected challenges and solutions  

E-Print Network [OSTI]

consumption levels, lack of energy access, environmental concerns like climate change and air pollution (RCPs) [2 ], the International Energy Agency's World Energy Outlook [3,4 ], and several modeAn energy vision: the transformation towards sustainability -- interconnected challenges

Silver, Whendee

448

A polarizer chip based on CMOS Cu-interconnect for optical telecommunications  

Science Journals Connector (OSTI)

The construction by CMOS Cu-interconnect fabrication technology of an optical chip that performs the function of linear polarization is described. The chip consists of three rows of...

Ko, Cheng-Hao; Lee, Kuei-Jen

2006-01-01T23:59:59.000Z

449

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, Wyoming  

Broader source: Energy.gov [DOE]

After the applicant withdrew its request to interconnect the proposed Hermosa West Wind Farm Project with Western Area Power Administrations transmission system, Western cancelled preparation of an EIS to evaluate the potential environmental impacts of the proposal.

450

Fast Algorithms for High Frequency Interconnect Modeling in VLSI Circuits and Packages  

E-Print Network [OSTI]

used in MEMS, RFID and MRAM. We present the first BEM algorithm to extract interconnect inductance with magnetic materials. The algorithm models magnetic characteristics by the Landau Lifshitz Gilbert equation and fictitious magnetic charges...

Yi, Yang

2011-02-22T23:59:59.000Z

451

Modeling and Analysis of Large-Scale On-Chip Interconnects  

E-Print Network [OSTI]

in computer aided design areas. This dissertation presents new methodologies for addressing the above two important challenging issues for large scale on-chip interconnect modeling and analysis: In the past, the standard statistical circuit modeling techniques...

Feng, Zhuo

2010-07-14T23:59:59.000Z

452

Determination of Interfacial Adhesion Strength between Oxide Scale and Substrate for Metallic SOFC Interconnects  

SciTech Connect (OSTI)

The interfacial adhesion strength between the oxide scale and the substrate is crucial to the reliability and durability of metallic interconnects in SOFC operating environments. It is necessary, therefore, to establish a methodology to quantify the interfacial adhesion strength between the oxide scale and the metallic interconnect substrate, and furthermore to design and optimize the interconnect material as well as the coating materials to meet the design life of an SOFC system. In this paper, we present an integrated experimental/analytical methodology for quantifying the interfacial adhesion strength between oxide scale and a ferritic stainless steel interconnect. Stair-stepping indentation tests are used in conjunction with subsequent finite element analyses to predict the interfacial strength between the oxide scale and Crofer 22 APU substrate.

Sun, Xin; Liu, Wenning N.; Stephens, Elizabeth V.; Khaleel, Mohammad A.

2008-01-21T23:59:59.000Z

453

Solid oxide fuel cell with single material for electrodes and interconnect  

DOE Patents [OSTI]

A solid oxide fuel cell having a plurality of individual cells. A solid oxide fuel cell has an anode and a cathode with electrolyte disposed therebetween, and the anode, cathode and interconnect elements are comprised of substantially one material.

McPheeters, Charles C. (Naperville, IL); Nelson, Paul A. (Wheaton, IL); Dees, Dennis W. (Downers Grove, IL)

1994-01-01T23:59:59.000Z

454

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

455

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos  

E-Print Network [OSTI]

ACTIVE SUBSTRATES FOR OPTOELECTRONIC INTERCONNECT Donald Chiarulli, Steven Levitan, Jason Bakos Semiconductor ABSTRACT We present the design of an intelligent optoelectronic chip carrier (IOCC the sapphire. The result is an optoelectronic package that supports full CMOS performance, is mechanically

Bakos, Jason D.

456

Process based cost modeling of emerging optoelectronic interconnects : implications for material platform choice  

E-Print Network [OSTI]

Continuously increasing demand for processing power, storage capacity, and I/O capacity in personal computing, data network, and display interface suggests that optical interconnects may soon supplant copper not only for ...

Liu, Shan, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

457

High-performance parallel processors based on star-coupled wavelength division multiplexing optical interconnects  

DOE Patents [OSTI]

As the performance of individual elements within parallel processing systems increases, increased communication capability between distributed processor and memory elements is required. There is great interest in using fiber optics to improve interconnect communication beyond that attainable using electronic technology. Several groups have considered WDM, star-coupled optical interconnects. The invention uses a fiber optic transceiver to provide low latency, high bandwidth channels for such interconnects using a robust multimode fiber technology. Instruction-level simulation is used to quantify the bandwidth, latency, and concurrency required for such interconnects to scale to 256 nodes, each operating at 1 GFLOPS performance. Performance scales have been shown to .apprxeq.100 GFLOPS for scientific application kernels using a small number of wavelengths (8 to 32), only one wavelength received per node, and achievable optoelectronic bandwidth and latency.

Deri, Robert J. (Pleasanton, CA); DeGroot, Anthony J. (Castro Valley, CA); Haigh, Ronald E. (Arvada, CO)

2002-01-01T23:59:59.000Z

458

File:08-CA-b - CAISO Interconnection Request Process.pdf | Open...  

Open Energy Info (EERE)

Process.pdf Jump to: navigation, search File File history File usage Metadata File:08-CA-b - CAISO Interconnection Request Process.pdf Size of this preview: 463 599 pixels....

459

Design of a decentralized detection filter for a class of interconnected LTI systems  

E-Print Network [OSTI]

In this thesis, we consider the problem of designing a decentralized detection filter for a class of homogeneous interconnected systems. In this class of systems, all subsystems have an identical structure. A fault in a subsystem propagates via...

Shankar, Shamanth

2001-01-01T23:59:59.000Z

460

Simulation of Bio-syngas Production from Biomass Gasification via Pressurized Interconnected Fluidized Beds  

Science Journals Connector (OSTI)

Bio-syngas production from biomass gasification via pressurized interconnected fluidized...T g), gasification pressure (p g) and steam to biomass ratio (S/B) on bio-syngas production

Fei Feng; Guohui Song; Laihong Shen

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

OE Releases "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012"  

Broader source: Energy.gov [DOE]

The "Transmission Constraints and Congestion in the Western and Eastern Interconnections, 2009-2012" document, which is now available for downloading, is a compilation of publicly-available data on transmission constraints and congestion for the period 2009 through 2012.

462

E-Print Network 3.0 - at-speed interconnect bist Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Explorit Topic List Advanced Search Sample search results for: at-speed interconnect bist Page: << < 1 2 3 4 5 > >> 1 JOURNAL OF ELECTRONIC TESTING: Theory and Applications 19,...

463

RAPID/Geothermal/Transmission Siting & Interconnection/Alaska...  

Open Energy Info (EERE)

receivers appointed by a court, that owns, operates, manages, or controls any plant, pipeline, or system for furnishing, by generation, transmission, or distribution, electrical...

464

IRSP (integrated resource strategic planning) with interconnected smart grids in integrating renewable energy and implementing DSM (demand side management) in China  

Science Journals Connector (OSTI)

Abstract The China's electricity consumption was 4966TWh in 2012, which is the world top electricity consumer. The low carbon electricity is one of the key issues of its sustainable development. IRSP (integrated resource strategic planning) is a useful tool to implement DSM (demand side management) and power planning on the supply side. However, the role of interconnected smart grids with fast growing cross-region transmission is not considered in the IRSP. Therefore, the paper proposes the model of IRSP with interconnected smart grids to integrate more renewable power generation to the grids and implement more DSM projects, which is called as IRSP-sgs (IRSP smart grids) model. Two scenarios are projected to study the impact of cross-region transmission on low carbon electricity by using the IRSP-sgs model until 2025 in China. Results show that the scenario with enhanced cross-region transmission helps to reduce electricity generation by 784.38TWh and reduce CO2 emission by 999.57 million tons during 20132025, since the multi-regional power operation can integrate more than 488.30TWh renewable generation into the grids and implement more DSM projects to substitute generation. In addition, it also provides tremendous opportunities to improve the stable operation of the power system.

Yanan Zheng; Zhaoguang Hu; Jianhui Wang; Quan Wen

2014-01-01T23:59:59.000Z

465

Sustainable Energy Solutions Task 1.0: Networked Monitoring and Control of Small Interconnected Wind Energy Systems  

SciTech Connect (OSTI)

EXECUTIVE SUMARRY This report presents accomplishments, results, and future work for one task of five in the Wichita State University Sustainable Energy Solutions Project: To develop a scale model laboratory distribution system for research into questions that arise from networked control and monitoring of low-wind energy systems connected to the AC distribution system. The lab models developed under this task are located in the Electric Power Quality Lab in the Engineering Research Building on the Wichita State University campus. The lab system consists of four parts: 1. A doubly-fed induction generator 2. A wind turbine emulator 3. A solar photovoltaic emulator, with battery energy storage 4. Distribution transformers, lines, and other components, and wireless and wired communications and control These lab elements will be interconnected and will function together to form a complete testbed for distributed resource monitoring and control strategies and smart grid applications testing. Development of the lab system will continue beyond this project.

Janet.twomey@wichita.edu

2010-04-30T23:59:59.000Z

466

Manufacturing Analysis of SOFC Interconnect Coating Processes - NexTech Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manufacturing Analysis of SOFC Manufacturing Analysis of SOFC Interconnect Coating Processes- NexTech Materials Background The adoption of high-temperature metal alloys as alternatives to traditional ceramic interconnect materials provides a cost effective path for the production of solid oxide fuel cells (SOFCs). Low-cost and effective protective coatings must be developed for the metallic system and stack components for SOFCs to be economical. Since current

467

Definition: Net generation | Open Energy Information  

Open Energy Info (EERE)

Net generation Net generation Jump to: navigation, search Dictionary.png Net generation Equal to gross generation less electrical energy consumed at the generating station(s).[1][2] View on Wikipedia Wikipedia Definition Related Terms Electricity generation, Gross generation, power, gross generation References ↑ http://www1.eere.energy.gov/site_administration/glossary.html#N ↑ http://205.254.135.24/tools/glossary/index.cfm?id=N Retrie LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ved from "http://en.openei.org/w/index.php?title=Definition:Net_generation&oldid=480320" Category: Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

468

Impact of High Solar Penetration in the Western Interconnection  

SciTech Connect (OSTI)

This paper presents an overview of the variable characteristics of solar power, as well as the accompanying grid dynamic performance and operational economics for a system with significant solar generation. The paper will show results of economic operational simulations of a very high solar generation future for the western half of the United States.

Lew, D.; Miller, N.; Clark, K.; Jordan, G.; Gao, Z.

2010-12-01T23:59:59.000Z

469

Worst Case Scenario for Large Distribution Networks with Distributed Generation  

E-Print Network [OSTI]

, tides, and geothermal heat, is the best choice as alternative source of energy. The interconnection and distribution networks, finally to the electric energy consumers. The life style of a nation is measured of these renewable energy sources and other forms of small generation such as combined heat and power (CHP) units

Pota, Himanshu Roy

470

Stridsvagn 122 och Remote Weapon Station.  

E-Print Network [OSTI]

?? Den hr uppsatsen behandlar stridsvagn122 och Remote Weapon Station (RWS). Det finns ett verkansglapp mellan dagens kalibrar 120 mm och 7,62 mm. Observationsmjligheterna i (more)

Sellberg, Martin

2010-01-01T23:59:59.000Z

471

GC GUIDANCE ON ELECTRIC VEHICLE RECHARGING STATIONS  

Broader source: Energy.gov [DOE]

Several National Laboratory contractors have asked whether appropriated funds may be used to reimburse cost of installing electric vehicle recharging stations and to pay electricity bill costs...

472

Hydrogen Fueling Infrastructure Research and Station Technology  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

box hydrogenandfuelcells.energy.gov Hydrogen Fueling Infrastructure Research and Station Technology Chris Ainscough, Joe Pratt, Jennifer Kurtz, Brian Somerday, Danny Terlip, Terry...

473

Hydrogen Fueling Infrastructure Research and Station Technology...  

Energy Savers [EERE]

Infrastructure Research and Station Technology Download presentation slides from the DOE Fuel Cell Technologies Office webinar "An Overview of the Hydrogen Fueling Infrastructure...

474

Alternative Fueling Station Locator | Department of Energy  

Energy Savers [EERE]

your browser to a new version. U.S. Department of Energy Energy Efficiency and Renewable Energy Source: Alternative Fuels Data Center Find alternative fueling stations near an...

475

New Buildings at the Fire Research Station  

Science Journals Connector (OSTI)

... THE new buildings of the Fire Research Station A of the Joint Fire Research Organization of the Department ... chemicals will be studied in the new chemical engineering laboratory.

D. I. LAWSON

1961-01-14T23:59:59.000Z

476

Turbine-generator replacement study  

SciTech Connect (OSTI)

This paper describes an engineering study for the replacement of a nominal 70 Mw turbine-generator in a multi-unit utility cogeneration station. The existing plant is briefly described, alternatives considered are discussed, and the conclusions reached are presented. Key topics are the turbine steam cycle evaluation and the turbine pedestal analysis.

Miller, E.F.; Stuhrke, S.P., Shah, A.A. (Burns and Roe Enterprises, Inc., Oradell, NJ (USA))

1988-01-01T23:59:59.000Z

477

Chapter 2 Offshore Wind Power Stations  

Science Journals Connector (OSTI)

Publisher Summary This chapter presents the historical background and development of offshore wind power stations. As early as 1890, windmills were put to work to produce electricity and more than 50,000 mills were in use in the United States alone in the twenties and thirties. Their decline was precipitated by the Rural Electrification Program. According to the San Francisco based Transaction Energy Projects Institute, offshore windmills could generate all the electrical power needed by northern California. Ocean winds have of course provided energy to windmills for centuries. In 1976, a study was commissioned by the (U.S.) Energy Research and Development Administration to ascertain and assess the economic value of offshore multi units aiming at identification and classification of area offshore types, assessing utility requirements for offshore power systems. It includes developing installation concepts including various floating and bottom-mounted designs, assessing current WECS (wind energy converter systems) for use in offshore environments, assessing various electric transmission and hydrogen delivery concepts, and performing an economic assessment, providing tradeoffs for variables such as distance offshore, climate, bottom and wave characteristics and average wave velocities. It is suggested that high wind velocity sites must be identified because the energy flow increases with the cube of the wind velocity; the kinetic energy of the wind passing through the area swept by the blades of a turbine is the energy available to that wind turbine. An average wind speed distribution is required.

1993-01-01T23:59:59.000Z

478

MERCURY SPECIATION SAMPLING AT NEW CENTURY ENERGY'S VALMONT STATION  

SciTech Connect (OSTI)

The 1990 Clean Air Act Amendments required the U.S. Environmental Protection Agency (EPA) to determine whether the presence of mercury in the stack emissions from fossil fuel-fired electric utility power plants poses an unacceptable public health risk. EPA's conclusions and recommendations were presented in the ''Mercury Study Report to Congress'' and ''Study of Hazardous Air Pollutant Emissions from Electric Utility Steam Generating Units''. The first report addressed both the human health and environmental effects of anthropogenic mercury emissions, while the second addressed the risk to public health posed by the emission of mercury and other hazardous air pollutants from steam electric generating units. Although these reports did not state that mercury controls on coal-fired electric power stations would be required given the current state of the art, they did indicate that the EPA views mercury as a potential threat to human health. Therefore, it was concluded that mercury controls at some point may be necessary. EPA also indicated that additional research/information was necessary before any definitive statement could be made. In an effort to determine the amount and types of mercury being emitted into the atmosphere by coal-fired power plants, EPA in late 1998 issued an information collection request (ICR) that required all coal-fired power plants to analyze their coal and submit the results to EPA on a quarterly basis. In addition, about 85 power stations were required to measure the speciated mercury concentration in the flue gas. These plants were selected on the basis of plant configuration and coal type. The Valmont Station owned and operated by New Century Energy in Boulder, Colorado, was selected for detailed mercury speciation of the flue gas as part of the ICR process. New Century Energy, in a tailored collaboration with EPRI and the U.S. Department of Energy, contracted with the Energy & Environmental Research Center (EERC) to do a study evaluating the behavior of mercury at the Valmont Station. The activities conducted at the Valmont Station by the EERC not only included the sampling needed to meet the requirements of the ICR, but involved a much more extensive mercury research program. The following objectives for the sampling at New Century Energy's Valmont Station were accomplished: (1) Successfully complete all of the mercury sampling and reporting requirements of the ICR. (2) Determine the variability in mercury concentrations at the stack using mercury continuous emission monitors (CEMs). (3) Calculate mercury mass balances and emission rates. (4) Determine the mercury concentration in the fly ash as a function of particle size. (5) Determine the impact of a fabric filter on mercury emissions for a western bituminous coal.

Dennis L. Laudal

2000-04-01T23:59:59.000Z

479

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

4-12: Hydrogen Cost Comparison for Electrolysis Station WithAnalysis: Electrolysis, 30 kg/day, grid Hydrogen Cost ($/kg)the hydrogen costs from the HSCM for electrolysis stations

Lipman, T E; Weinert, Jonathan X.

2006-01-01T23:59:59.000Z

480

Daily Reporting Rainfall Station TULLY & JOHNSTONE RIVERS Manual Heavy Rainfall Station  

E-Print Network [OSTI]

Daily Reporting Rainfall Station TULLY & JOHNSTONE RIVERS Manual Heavy Rainfall Station Manual Tide TM Bulgun Ck AL Bingil Bay The Boulders TM Nerada AL Tung Oil AL Fishers Ck TM Corsis AL Russell

Greenslade, Diana

Note: This page contains sample records for the topic "generation station interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Daily Reporting Rainfall Station TULLY & JOHNSTONE RIVERS Manual Heavy Rainfall Station  

E-Print Network [OSTI]

Daily Reporting Rainfall Station TULLY & JOHNSTONE RIVERS Manual Heavy Rainfall Station Manual The Boulders TM Nerada AL Tung Oil AL Fishers Ck TM Corsis AL RussellR Babinda Clyde Rd AL Central Mill AL

Greenslade, Diana

482

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network [OSTI]

4: Energy Station Grid electricity Cogen Heat Exhaust (CO2)Recycled Reformate Grid electricity Cogen Heat Electricity

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

483

Electric power from offshore wind via synoptic-scale interconnection  

Science Journals Connector (OSTI)

...supporting large-scale renewable energy . J Power Sources 144...distributed generation of wind energy in Europe . PhD thesis...measurements . National Renewable Energy Laboratory , p 9 , NREL...resource of southeastern Brazil . Renew Energ 33 : 2375...

Willett Kempton; Felipe M. Pimenta; Dana E. Veron; Brian A. Colle

2010-01-01T23:59:59.000Z

484

CCHP System with Interconnecting Cooling and Heating Network  

E-Print Network [OSTI]

The consistency between building heating load, cooling load and power load are analyzed in this paper. The problem of energy waste and low equipment usage in a traditional CCHP (combined cooling, heating and power) system with generated electricity...

Fu, L.; Geng, K.; Zheng, Z.; Jiang, Y.

2006-01-01T23:59:59.000Z

485

LVRT Capability of DFIGs in Interconnected Power Systems  

Science Journals Connector (OSTI)

This chapter presents a new control scheme for the enhancement of the low-voltage ride-through (LVRT) capability of doubly-fed induction generators (DFIGs). LVRT capability is provided by extending the range o...

Jahangir Hossain; Hemanshu Roy Pota

2014-01-01T23:59:59.000Z

486

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

487

Daily Reporting Rainfall Station MULGRAVE-RUSSELL RIVERS Manual Heavy Rainfall Station  

E-Print Network [OSTI]

Station Telemetry Rainfall Station Telemetry River Station Revised: Nov 2011 MAP 111.1 FLOOD WARNING ulgraveR The Boulders TM RussellR Clyde Rd AL Babinda Bucklands TM Daradgee McAvoy Br AL 0 5 10 kilometres

Greenslade, Diana

488

Background noise spectra of global seismic stations  

SciTech Connect (OSTI)

Over an extended period of time station noise spectra were collected from various sources for use in estimating the detection and location performance of global networks of seismic stations. As the database of noise spectra enlarged and duplicate entries became available, an effort was mounted to more carefully select station noise spectra while discarding others. This report discusses the methodology and criteria by which the noise spectra were selected. It also identifies and illustrates the station noise spectra which survived the selection process and which currently contribute to the modeling efforts. The resulting catalog of noise statistics not only benefits those who model network performance but also those who wish to select stations on the basis of their noise level as may occur in designing networks or in selecting seismological data for analysis on the basis of station noise level. In view of the various ways by which station noise were estimated by the different contributors, it is advisable that future efforts which predict network performance have available station noise data and spectral estimation methods which are compatible with the statistics underlying seismic noise. This appropriately requires (1) averaging noise over seasonal and/or diurnal cycles, (2) averaging noise over time intervals comparable to those employed by actual detectors, and (3) using logarithmic measures of the noise.

Wada, M.M.; Claassen, J.P.

1996-08-01T23:59:59.000Z

489

Oben: Die Station im Watt bei Spiekeroog.  

E-Print Network [OSTI]

Oben: Die Station im Watt bei Spiekeroog. Unten: Ausschnitt des innen begeh- baren Pfahlrohrs mit Ossietzky Universität Oldenburg Meeresdaten rund um die Uhr: Die Station im Watt Von Rainer Reuter In autumn Rückseiten- watt und offener Nordsee. Die Umwelt zu beobachten und verläss- liche Messungen zu gewinnen, ist

Oldenburg, Carl von Ossietzky Universität

490

Flexibility Reserve Reductions from an Energy Imbalance Market with High Levels of Wind Energy in the Western Interconnection  

SciTech Connect (OSTI)

The anticipated increase in variable generation in the Western Interconnection (WI) over the next several years has raised concerns about how to maintain system balance, especially in smaller Balancing Areas (BAs). Given renewable portfolio standards in the West, it is possible that more than 50 gigawatts (GW) of wind capacity will be installed by 2020. Significant quantities of solar generation are likely to be added as well. The consequent increase in variability and uncertainty that must be managed by the conventional generation fleet and responsive load make it attractive to consider ways in which Balancing Area Authorities (BAAs) can pool their variability and response resources, thus taking advantage of geographic and temporal diversity to increase overall operational efficiency. Our analysis considers several alternative forms of an Energy Imbalance Market (EIM) that have been proposed in the non-market areas of the WI. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: BAA cooperation and sub-hourly dispatch. As proposed, the EIM does not consider any form of coordinated unit commitment; however, over time it is possible that BAAs would develop formal or informal coordination plans. This report examines the benefits of several possible EIM implementations, both separately and in concert.

King, J.; Kirby, B.; Milligan, M.; S. Beuning

2011-10-01T23:59:59.000Z

491

The use of geothermal energy: A reliable, cheap, and environmentally friendly method for generating electricity and heat  

Science Journals Connector (OSTI)

The economical and environmental aspects of generating electricity at traditional thermal power stations and at geothermal power stations are considered. The dynamics of prices for fossil fuel and results from...

O. A. Povarov; O. M. Dubnov; A. I. Nikolskii

2007-08-01T23:59:59.000Z

492

Analysis of variable-frequency currents superimposed on DC currents in asynchronous HVDC Links in stressing turbine-generator-exciter shafts  

SciTech Connect (OSTI)

Ripple currents on the DC side of both HVDC asynchronous and synchronous Links can excite in some circumstances onerous torsional vibrations in large steam generator shafts. The problem has assumed importance in recent months on account of the HVDC Link between Scotland and Northern Ireland going ahead, on account of the proposed Eire/Wales Link, because AC/DC/AC couplers are to be installed to interconnect the East and West European Grid Systems, and because resonances have been observed on machines in close proximity to AC/DCIAC couplers and HVDC Links. This paper discusses and analyses excitation of shaft torsional vibrations in steam turbine-generator-exciter shafts in close proximity to HVDC converter stations by variable-frequency ripple currents superimposed on DC currents in asynchronous Links. It presents technical knowledge not arranged for convenient reference heretofore in studying possible excitation of turbine-generator-v/ exciter shaft torsional vibrations by non-characteristic HVDC converter harmonic currents if a machine should be considered to be at risk. Shaft torques in multi-machine networks are evaluated by proportioning HVDC Link disturbance currents to each machine at risk using system network data, generator data and fault analysis data considering frequency dependence of the system parameters. This scaling factor is calculated for different scenarios of system operation and load. Equivalent circuits for the synchronous generator are employed appropriately to correlate HVDC Link disturbance current impressed on the generator stator with s state torque excitation from which magnitude of turbine-generator-exciter shaft torque is deduced.

Hammons, T.J.; Bremner, J.J. [Univ. of Glasgow (United Kingdom)] [Univ. of Glasgow (United Kingdom)

1995-03-01T23:59:59.000Z

493

Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compressed Natural Gas Compressed Natural Gas Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations on Google Bookmark Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations on Delicious Rank Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Compressed Natural Gas Fueling Stations on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Locations Infrastructure Development Compressed Natural Gas Stations

494

Alternative Fuels Data Center: Electric Vehicle Charging Stations  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle Electric Vehicle Charging Stations to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Charging Stations on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Charging Stations on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Charging Stations on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Charging Stations on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Charging Stations on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Charging Stations on AddThis.com... More in this section... Electricity Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Electric Vehicle Charging Stations

495

Validation of an Integrated Hydrogen Energy Station  

SciTech Connect (OSTI)

This report presents the results of a 10-year project conducted by Air Products and Chemicals, Inc. (Air Products) to determine the feasibility of coproducing hydrogen with electricity. The primary objective was to demonstrate the technical and economic viability of a hydrogen energy station using a high-temperature fuel cell designed to produce power and hydrogen. This four-phase project had intermediate go/no-go decisions and the following specific goals: ?¢???¢ Complete a technical assessment and economic analysis of the use of high-temperature fuel cells, including solid oxide and molten carbonate, for the co-production of power and hydrogen (energy park concept). ?¢???¢ Build on the experience gained at the Las Vegas H2 Energy Station and compare/contrast the two approaches for co-production. ?¢???¢ Determine the applicability of co-production from a high-temperature fuel cell for the existing merchant hydrogen market and for the emerging hydrogen economy. ?¢???¢ Demonstrate the concept on natural gas for six months at a suitable site with demand for both hydrogen and electricity. ?¢???¢ Maintain safety as the top priority in the system design and operation. ?¢???¢ Obtain adequate operational data to provide the basis for future commercial activities, including hydrogen fueling stations. Work began with the execution of the cooperative agreement with DOE on 30 September 2001. During Phase 1, Air Products identified high-temperature fuel cells as having the potential to meet the coproduction targets, and the molten carbonate fuel cell system from FuelCell Energy, Inc. (FuelCell Energy) was selected by Air Products and DOE following the feasibility assessment performed during Phase 2. Detailed design, construction and shop validation testing of a system to produce 250 kW of electricity and 100 kilograms per day of hydrogen, along with site selection to include a renewable feedstock for the fuel cell, were completed in Phase 3. The system also completed six months of demonstration operation at the wastewater treatment facility operated by Orange County Sanitation District (OCSD, Fountain Valley, CA). As part of achieving the objective of operating on a renewable feedstock, Air Products secured additional funding via an award from the California Air Resources Board. The South Coast Air Quality Management District also provided cost share which supported the objectives of this project. System operation at OCSD confirmed the results from shop validation testing performed during Phase 3. Hydrogen was produced at rates and purity that met the targets from the system design basis, and coproduction efficiency exceeded the 50% target set in conjunction with input from the DOE. Hydrogen production economics, updated from the Phase 2 analysis, showed pricing of $5 to $6 per kilogram of hydrogen using current gas purification systems. Hydrogen costs under $3 per kilogram are achievable if next-generation electrochemical separation technologies become available.

Edward C. Heydorn

2012-10-26T23:59:59.000Z

496

LNG to CNG refueling stations  

SciTech Connect (OSTI)

While the fleet operator is concerned about the environment, he or she is going to make the choice based primarily on economics. Which fuel provides the lowest total operating cost? The calculation of this costing must include the price-per-gallon of the fuel delivered, as well as the tangible and intangible components of fuel delivery, such as downtime for vehicles during the refueling process, idle time for drivers during refueling, emissions costings resulting from compressor oil blow-by, inclusion of non-combustible constituents in the CNG, and energy consumption during the refueling process. Also, the upfront capital requirement of similar delivery capabilities must be compared. The use of LNG as the base resource for the delivered CNG, in conjunction with the utilization of a fully temperature-compressed LNG/CNG refueling system, eliminates many of the perceived shortfalls of CNG. An LNG/CNG refueling center designed to match the capabilities of the compressor-based station will have approximately the same initial capital requirement. However, because it derives its CNG sales product from the {minus}260 F LNG base product, thus availing itself of the natural physical properties of the cryogenic product, all other economic elements of the system favor the LNG/CNG product.

Branson, J.D. [ECOGAS Corp., Austin, TX (United States)

1995-12-31T23:59:59.000Z

497

Burner balancing Salem Harbor Station  

SciTech Connect (OSTI)

The traditional method of burner balancing is first to determine the fuel distribution, then to measure the economizer outlet excess oxygen distribution and to adjust the burners accordingly. Fuel distribution is typically measured by clean and dirty air probing. Coal pipe flow can then be adjusted, if necessary, through the use of coal pipe orificing or by other means. Primary air flow must be adjusted to meet the design criteria of the burner. Once coal pipe flow is balanced to within the desired criteria, secondary air flow to individual burners can be changed by adjusting windbox dampers, burner registers, shrouds or other devices in the secondary air stream. This paper discusses problems encountered in measuring excess O{sub 2} at the economizer outlet. It is important to recognize that O{sub 2} measurements at the economizer outlet, by themselves, can be very misleading. If measurement problems are suspected or encountered, an alternate approach similar to that described should be considered. The alternate method is not only useful for burner balancing but also can be used to help in calibrating the plant excess O{sub 2} instruments and provide an on line means of cross-checking excess air measurements. Balanced burners operate closer to their design stoichiometry, providing better NO{sub x} reduction. For Salem Harbor Station, this means a significant saving in urea consumption.

Sload, A.W. [New England Power Co., Salem, MA (United States); Dube, R.J. [DB Riley, Inc., Worcester, MA (United States). Fuel Equipment Design

1995-12-31T23:59:59.000Z

498

Plastic deformation in Al (Cu) interconnects stressed by electromigration and studied by synchrotron polychromatic X-ray microdiffraction  

E-Print Network [OSTI]

Plastic deformation in Al (Cu) interconnects stressed bygrain orientation [7], study plastic deformation [12-15] andThis aspect of EM-induced plastic deformation in grains

Chen, Kai; Advanced Light Source; UCLA

2008-01-01T23:59:59.000Z

499

Measurements of Collimator Wakefields at End Station A  

SciTech Connect (OSTI)

The angular deflection of a 28.5 GeV electron beam passing off-axis between the jaws of a collimator, generating a transverse wakefield, were measured in End Station A (ESA) at SLAC. In total, fifteen different configurations of collimator geometry and material were tested: some were chosen for compatibility with previous measurements while others served to study the effect of geometry and taper angles (geometrical contribution to the wakefield) and the effect of the material resistivity (resistive contribution) to the imparted kick. This paper summarises the last update of preliminary experimental results before they are finalised. The reconstructed kick factor is compared to analytical calculations and simulations.

Fernandez-Hernando, J.L.; /Daresbury; Molloy, S.; /SLAC; Smith, J.D.A.; /Cockcroft Inst. Accel. Sci. Tech.; Watson, Nigel Keith; /Birmingham U.

2011-11-01T23:59:59.000Z

500

Control of Noise in Power Station Cooling Tower Systems  

Science Journals Connector (OSTI)

Power?station cooling tower systems must handle large volumes of water and air with large potential energy in the water flows and the requirement for large fans. To minimize the noise generated at power station sites use is made of efficient tower fill materials dual low?speed fans (which shifts the spectrum and lowers mid?frequency noise level) and barrier effects in tower location and orientation. Conventional noise control measures such as mufflers are avoided because of the required increase in pressure across the fan and the high initial cost for quieting large towers. The use of natural draft towers is discussed and it is shown that although the low?frequency noise may be reduced the noise levels at typical property line locations are of the same order of magnitude as that for conventional mechanical cooling towers. Since cooling towers at power stations are required as an environmental (thermal) pollution control measure a trade?off between temperature rise of local water supplies versus increases in community noise becomes a critical factor.

Lewis S. Goodfriend

1973-01-01T23:59:59.000Z