Re: Potomac River Generating Station Department of Energy Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Notification of Planned 230kV Outage at Potomac River Generating Station...

2

Re: Potomac River Generating Station Department of Energy, Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for...

3

Re: Potomac River Generating Station Department of Energy Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No....

4

Re: Potomac River Generating Station Department of Energy, Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of Energy's Order No. 202-05-3 issued December 20, 2005 ("DOE Potomac River Order"), Pepco has filed notice of the planned outages, in sequence during January 2006, of each of the two 230 kV circuits serving the downtown area of the District of Columbia. Earlier scheduled maintenance on these lines was postponed because of the shutdown of Mirant's Potomac River Generating Plant, but a recent forced outage on one of the lines makes it imprudent to delay maintenance any longer. Department of Energy Order No. 202-05-03 Notice of Planned Outages, in Sequence During January 2006 More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages

5

Re: Potomac River Generating Station Department of Energy Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Notice of Power Outages. Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No. 202-05-03: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the captioned proceeding, Order No. 202-05-03 ("December 20 Order"), Pepco will provide advance notification of the outages to Mirant, PJM, the Department of Energy ("Department"), the Federal Energy Regulatory Commission, the Environmental Protection Agency,

6

Re: Potomac River Generating Station Department of Energy Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO is providing you with information regarding the planned PEPCO is providing you with information regarding the planned transmission maintenance outage Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage Docket No. EO-05-01. Order No. 202-07-02: Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during

7

Re: Potomac River Generating Station Department of Energy, Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

evised plan for evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the following information regarding the revised plan for transmission outages for the 230 kV circuits that are scheduled during the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the above-captioned proceeding, Order No. 202-05-03, and pursuant to the expanded notice required in Order No. 202-07-02, issued on January 31 Order, Pepco will provide advance notification of the outages to Mirant,

8

Re: Potomac River Generating Station Department of Energy, Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintenance on these lines was postponed because of the shutdown of Mirant's Potomac River Generating Plant, but a recent forced outage on one of the lines makes it imprudent to...

9

Energy Department Excepted Personnel, by duty station | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Excepted Personnel, by duty station In the event of a lapse of appropriations, the Energy Department excepted personnel by duty station as of December 14, 2011....

10

Woodsdale Generating Station project management  

Science Conference Proceedings (OSTI)

This paper is written for those who are planning new generation construction, particularly combustion turbine units, which will, according to projections, constitute a significant portion of new generation construction during the 1990's. Our project management and schedule for the Woodsdale Generating Station is presented to aid others in the planning, organization, and scheduling for new combustion turbine stations.

Carey, R.P. (Cincinnati Gas and Electric Co., OH (United States))

1990-01-01T23:59:59.000Z

11

Illinois Nuclear Profile - Dresden Generating Station  

U.S. Energy Information Administration (EIA)

Nuclear Power Plant Data for Dresden Generating Station Author: DOE/EIA Keywords: Dresden Generating Station, Illinois, Nuclear, Plant, Reactor, Generation, Capacity

12

Fossil Generating Station Case Histories  

Science Conference Proceedings (OSTI)

This annual EPRI Technical Update is a compilation of several case histories of events and activities that occurred at member fossil generating stations in 2007. The purpose of this report is to share this operating experience with other member utilities so that lessons can be learned and an opportunity provided to improve overall performance across the generation fleet.

2008-03-27T23:59:59.000Z

13

Fossil Generating Station Case Histories  

Science Conference Proceedings (OSTI)

During 2005, EPRI Operations and Management Program managers and contractors have collected information on events that have occurred in fossil generating stations. These events represent only a small sample of those being experienced by the power generation industry, but provide a basis for understanding where actions to improve operations are necessary. Sufficient details have been included for analyzing the events without divulging sources. Recognizing that these reports represent actual events and not...

2006-03-30T23:59:59.000Z

14

Fossil Generating Station Case Histories  

Science Conference Proceedings (OSTI)

During 2006, EPRI Operations and Management Program managers have collected information on events that have occurred in fossil generating stations. These events represent only a small sample of those being experienced by the power generation industry, but provide a basis for understanding where actions to improve operations are necessary. Sufficient details have been included for analyzing the events without divulging sources. Recognizing that these reports represent actual events and not discounting the...

2007-03-27T23:59:59.000Z

15

Dubuque generation station, Dubuque, Iowa  

SciTech Connect

Alliant Energy's Dubuque generation station is a fine example of why small does not mean insignificant in the power generation industry. This winner of the EUCG best performer award in the small plant category shows that its operating excellence towers over that of many larger and much newer coal-fired power plants. The plant has three operating units with boilers originally designed for Illinois basin coal but now Powder River Basin coal makes up 75% of the coal consumed. The boilers can also burn natural gas. 4 photos.

Peltier, R.

2008-10-15T23:59:59.000Z

16

Washington Nuclear Profile - Columbia Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Columbia Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

17

Illinois Nuclear Profile - Braidwood Generation Station  

U.S. Energy Information Administration (EIA) Indexed Site

Braidwood Generation Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

18

Kansas Nuclear Profile - Wolf Creek Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

April 2012" "Next Release Date: February 2013" "Wolf Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor...

19

Illinois Nuclear Profile - Byron Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Byron Generating Station" ,"Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

20

Illinois Nuclear Profile - Dresden Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Dresden Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Work Management Improvement at Louisa Generating Station  

Science Conference Proceedings (OSTI)

This report describes results of a Work Management Improvement project at the Louisa Generating Station, MidAmerican Energy Company, Muscatine, Iowa.

2001-11-19T23:59:59.000Z

22

Next Generation Hydrogen Stations: All Composite Data Products through Fall 2012  

DOE Green Energy (OSTI)

This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes 14 composite data products (CDPs) for next generation hydrogen stations.

Sprik, S.; Wipke, K.; Ramsden, T.; Ainscough, C.; Kurtz, J.

2012-10-01T23:59:59.000Z

23

"1. PSEG Salem Generating Station","Nuclear","PSEG Nuclear LLC...  

U.S. Energy Information Administration (EIA) Indexed Site

Jersey" "1. PSEG Salem Generating Station","Nuclear","PSEG Nuclear LLC",2370 "2. PSEG Linden Generating Station","Gas","PSEG Fossil LLC",1587 "3. Bergen Generating...

24

Washington Nuclear Profile - Columbia Generating Station  

U.S. Energy Information Administration (EIA)

snpt3wa371 1,097 9,241 96.2 BWR Columbia Generating Station Unit Type Data for 2010 BWR = Boiling Water Reactor. Note: Totals may not equal sum of components due to ...

25

Kansas Nuclear Profile - Wolf Creek Generating Station  

U.S. Energy Information Administration (EIA)

snpt3ks210 1,160 9,556 94.0 PWR Wolf Creek Generating Station Unit Type Data for 2010 PWR = Pressurized Light Water Reactor. Note: Totals may not ...

26

Analyzing auxiliary system in nuclear generating stations  

Science Conference Proceedings (OSTI)

The design for most nuclear generating stations took place before the widespread use of computerized engineering tools. The manual design basis calculations that were performed vary in quantity from only a few feet of shelf space for some of the first stations to bookcases full for stations that are now receiving their operating licenses. Some of the following issues may apply to the manual calculation files of any nuclear station: Errors and lack of detail in hand calculations; Calculations that may not document the required safety functions; Calculations that lag behind the as-built condition of the station; Documentation that does not add up to a coherent whole; and incomplete auditability and traceability of data. The increasing use of computerized tools in nuclear generating station analysis has helped address the hand-calculation problems. The use of a master system model to study various scenarios also ensures that uniform assumptions are being used for all related analyses. This article presents an overview of how computerized tools are being used for both ac and dc auxiliary system calculations. Problems that may be created by the use of these tools are discussed, along with a review of those issues specific to nuclear generating stations.

Jancauskas, J.R. (Gilber/Commonwealth (US))

1992-07-01T23:59:59.000Z

27

EIS-0435: Modification of the Groton Generation Station Interconnectio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection...

28

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

29

Energy Department Launches Alternative Fueling Station Locator App |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App November 7, 2013 - 11:16am Addthis As part of the Obama Administration's commitment to expand access to data and give consumers more transportation options that save money at the pump, the Energy Department today launched a new mobile app to help drivers find stations that provide alternative fuel for vehicles. Developed by the National Renewable Energy Laboratory with support from the Energy Department, the Alternative Fueling Station Locator app provides information on more than 15,000 stations across the country. Users can search for stations that offer electricity, biodiesel (B20), natural gas (compressed and liquefied), ethanol (E85), hydrogen, and propane. After the

30

Energy Department Applauds World’s First Fuel Cell and Hydrogen Energy Station in Orange County  

Energy.gov (U.S. Department of Energy (DOE))

Washington, D.C. – The U.S. Department of Energy today issued the following statement in support of the commissioning of the world’s first tri-generation fuel cell and hydrogen energy station to...

31

Emergency Management Guideline for Fossil Generating Stations  

Science Conference Proceedings (OSTI)

This EPRI guideline builds on industry experience, including lessons learned during the severe U.S. hurricane seasons of 2004 and 2005, to present a framework for the development of an emergency management program at a generating station. The guideline is specifically intended for fossil plants, although much of the information is relevant to other types of facilities.

2008-03-20T23:59:59.000Z

32

Fossil Generating Station Case Histories 2010  

Science Conference Proceedings (OSTI)

During 2010, EPRI Operations and Management Program managers and contractors collected information on events that have occurred in fossil generating stations. These events represent only a small sample of those being experienced by the power generation industry, but they provide a basis for understanding where actions to improve operations are necessary. Sufficient details have been included for analyzing the events without divulging sources. Recognizing that these reports represent actual events and not...

2010-12-23T23:59:59.000Z

33

Fossil Generating Station Case Histories 2009  

Science Conference Proceedings (OSTI)

In this report, the Electric Power Research Institute (EPRI) has compiled the events and activities that occurred at member fossil generating stations in 2009. The purpose of this report is to share this operating experience with other member utilities so that lessons can be learned and applied to improve overall performance across the generation fleet. The report also includes a summary of findings from plant operations and maintenance assessments that were conducted in 2008–2009. The focus of these ass...

2009-12-21T23:59:59.000Z

34

Work Management Improvement at Burlington Generating Station  

Science Conference Proceedings (OSTI)

The Work Coordination Process (WCP), developed in an EPRI tailored collaboration effort to upgrade the maintenance program at Burlington Generating Station, is an organized methodology to prepare for and perform preventative and corrective maintenance during both outages and running periods. The coordinating process supports both the need of operational personnel for maximum equipment availability and the need of maintenance personnel for access to plant equipment to ensure maximum reliability.

2001-11-19T23:59:59.000Z

35

Energy Department Launches Alternative Fueling Station Locator App |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Launches Alternative Fueling Station Locator App Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App November 7, 2013 - 11:16am Addthis As part of the Obama Administration's commitment to expand access to data and give consumers more transportation options that save money at the pump, the Energy Department today launched a new mobile app to help drivers find stations that provide alternative fuel for vehicles. Developed by the National Renewable Energy Laboratory with support from the Energy Department, the Alternative Fueling Station Locator app provides information on more than 15,000 stations across the country. Users can search for stations that offer electricity, biodiesel (B20), natural gas (compressed and liquefied), ethanol (E85), hydrogen, and propane. After the

36

Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts  

Science Conference Proceedings (OSTI)

Pursuant to the Clean Air Act, the U.S. Environmental Protection Agency (EPA) announced in 2009 its intent to issue rules for controlling emissions from Navajo Generating Station that could affect visibility at the Grand Canyon and at several other national parks and wilderness areas. The final rule will conform to what EPA determines is the best available retrofit technology (BART) for the control of haze-causing air pollutants, especially nitrogen oxides. While EPA is ultimately responsible for setting Navajo Generating Station's BART standards in its final rule, it will be the U.S. Department of the Interior's responsibility to manage compliance and the related impacts. This study aims to assist both Interior and EPA by providing an objective assessment of issues relating to the power sector.

Hurlbut, D. J.; Haase, S.; Brinkman, G.; Funk, K.; Gelman, R.; Lantz, E.; Larney, C.; Peterson, D.; Worley, C.; Liebsch, E.

2012-01-01T23:59:59.000Z

37

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

38

Alternative Fueling Station Locator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Fueling Station Locator Alternative Fueling Station Locator Alternative Fueling Station Locator Find Stations Plan a Route Location: Go Start: End: Go Fuel: All Fuels Biodiesel (B20 and above) Compressed Natural Gas Electric Ethanol (E85) Hydrogen Liquefied Natural Gas (LNG) Liquefied Petroleum Gas (Propane) more search options close × More Search Options Include private stations Include planned stations Owner All Private Federal State Local Utility Payment All American Express Discover MasterCard VISA Cash Checks CFN Clean Energy Fuel Man Gas Card PHH Services Voyager WEX Electric charger types Include level 1 Include level 2 Include DC fast Include legacy chargers Limit results to within 5 miles Limit results to within 5 miles 12,782 alternative fuel stations in the United States Excluding private stations

39

Case Study: Darlington Nuclear Generating Station  

Science Conference Proceedings (OSTI)

Darlington is a four-reactor nuclear plant east of Toronto. It is operated by Ontario Hydro. Each reactor has two independent shutdown systems: SDS1 drops neutron-absorbing rods into the core, while SDS2 injects liquid poison into the moderator. Both ... Keywords: Atomic Energy Control Board of Canada, Canada, Darlington nuclear generating station, Ontario Hydro, case study, certification, code quality, decision-making logic, documentation, fission reactor core control and monitoring, fission reactor safety, formal methods, formal model-based inspection, formal specification, licensing, liquid poison injection, neutron-absorbing rods, nuclear engineering computing, nuclear plant, safety, safety-critical systems, software driven shutdown systems, software reliability, specifications

Dan Craigen; Susan Gerhart; Ted Ralston

1994-01-01T23:59:59.000Z

40

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Vehicle Recharging Stations Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs. In addition, lab contractors may install electric vehicle recharging

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs.

42

Alternative Fueling Station Locator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vehicle Technologies Awardees Advanced Vehicle Technologies Awardees Department of Energy Facilities Department of Energy Facilities Recovery Act Smart Grid Projects Recovery...

43

Illinois Nuclear Profile - LaSalle Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

LaSalle Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

44

New Jersey Nuclear Profile - PSEG Salem Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

PSEG Salem Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

45

California Nuclear Profile - San Onofre Nuclear Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

San Onofre Nuclear Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

46

New Jersey Nuclear Profile - PSEG Hope Creek Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

PSEG Hope Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

47

Alternative Fueling Station Locator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Ethanol (E85) Hydrogen Liquefied Natural Gas (LNG) Liquefied Petroleum Gas (Propane) more search options close More Search Options Include private stations Include...

48

Washington DC's First Electric Vehicle Charging Station | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington DC's First Electric Vehicle Charging Station Washington DC's First Electric Vehicle Charging Station Washington DC's First Electric Vehicle Charging Station November 17, 2010 - 11:28am Addthis Street signage for Washington, DC's first electric vehicle charging station located on the northwest corner of the intersection of U and 14th streets. | Department of Energy Photo | Street signage for Washington, DC's first electric vehicle charging station located on the northwest corner of the intersection of U and 14th streets. | Department of Energy Photo | Shannon Brescher Shea Communications Manager, Clean Cities Program It's always exciting to attend a grand opening, especially when it represents a "first" for an entire region. Yesterday, the U.S. Department of Energy and the city of Washington, DC joined together to

49

Tri-Generation Success Story: World's First Tri-Gen Energy Station - Fountain Valley  

NLE Websites -- All DOE Office Websites (Extended Search)

Tri-Generation Success Tri-Generation Success Story World's First Tri-Gen Energy Station- Fountain Valley The Fountain Valley energy station, supported in part by a $2.2 million grant from the Energy Department, is the world's first tri-generation hydrogen energy and electrical power station to provide transportation fuel to the public and electric power to an industrial facility. Located at the Orange County Sanitation District's wastewater treatment plant in Fountain Valley, California, the unit is a combined heat, hydrogen, and power (CHHP) system that co-produces hydrogen in addition to electricity and heat, making it a tri-generation system. The hydrogen produced by the system

50

Department of Energy Helping Americans Find Alternative Fuel Stations |  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Helping Americans Find Alternative Fuel Department of Energy Helping Americans Find Alternative Fuel Stations Department of Energy Helping Americans Find Alternative Fuel Stations May 29, 2013 - 2:14pm Addthis Helping Americans explore and adopt alternative energy sources beyond oil and gasoline has become easier. The Department of Energy's (DOE) National Renewable Energy Laboratory and DOE Clean Cities have made it a snap to find the location of alternative fuel stations across the United States by making that information available online in a variety of formats, including web applications, mobile applications, widgets, APIs, and raw data files on the Alternative Fuels Data Center (AFDC) site. These tools enable users to leverage the data to find fuel stations, post custom fueling location maps on their own websites, or access data for web

51

Next Generation Radioisotope Generators | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

» Next Generation Radioisotope Generators » Next Generation Radioisotope Generators Next Generation Radioisotope Generators Advanced Stirling Radioisotope Generator (ASRG) - The ASRG is currently being developed as a high-efficiency RPS technology to support future space missions on the Martian surface or in the vacuum of space. This system uses Stirling convertors, which have moving parts to mechanically convert heat to electricity. This power conversion system, if successfully deployed, will reduce the weight of each RPS and the amount of Pu-238 needed per mission. A HISTORY OF MISSION SUCCESSES For over fifty years, the Department of Energy has enabled space exploration on 27 missions by providing safe reliable radioistope power systems and radioisotope heater units for NASA, Navy and Air Force.

52

EIS-0435: Modification of the Groton Generation Station Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Modification of the Groton Generation Station 5: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Summary This EIS evaluates the environmental impacts of a proposal for DOE's Western Area Power Administration to modify its Large Generator Connection Agreement for the Groton Generation Station in Brown County, South Dakota. The modification would allow Basin Electric Power Cooperative, which operates the generation station, to produce power above the current operating limit of 50 average megawatts. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download June 3, 2011 EIS-0435: Final Environmental Impact Statement

53

Police Station Triples Solar Power - and Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Police Station Triples Solar Power - and Savings Police Station Triples Solar Power - and Savings Police Station Triples Solar Power - and Savings July 19, 2010 - 11:00am Addthis North Community Police Substation upgraded its solar energy system with the help of Recovery Act funds. The city’s electric bill will be about $5,000 cheaper. | Courtesy of the City of Henderson North Community Police Substation upgraded its solar energy system with the help of Recovery Act funds. The city's electric bill will be about $5,000 cheaper. | Courtesy of the City of Henderson Stephen Graff Former Writer & editor for Energy Empowers, EERE The Henderson, Nev., police department is going above and beyond the call of duty by tripling the size of its solar panel system on its LEED-certified station, saving the city thousands of dollars in energy

54

Grand Blanc Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Grand Blanc Generating Station Biomass Facility Grand Blanc Generating Station Biomass Facility Jump to: navigation, search Name Grand Blanc Generating Station Biomass Facility Facility Grand Blanc Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

55

Brent Run Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Brent Run Generating Station Biomass Facility Brent Run Generating Station Biomass Facility Jump to: navigation, search Name Brent Run Generating Station Biomass Facility Facility Brent Run Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

56

Peoples Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Peoples Generating Station Biomass Facility Peoples Generating Station Biomass Facility Jump to: navigation, search Name Peoples Generating Station Biomass Facility Facility Peoples Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

57

WWTP Power Generation Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Power Generation Station Biomass Facility Power Generation Station Biomass Facility Jump to: navigation, search Name WWTP Power Generation Station Biomass Facility Facility WWTP Power Generation Station Sector Biomass Facility Type Non-Fossil Waste Location Alameda County, California Coordinates 37.6016892°, -121.7195459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.6016892,"lon":-121.7195459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

58

Springerville Generating Station Solar System Solar Power Plant | Open  

Open Energy Info (EERE)

Springerville Generating Station Solar System Solar Power Plant Springerville Generating Station Solar System Solar Power Plant Jump to: navigation, search Name Springerville Generating Station Solar System Solar Power Plant Facility Springerville Generating Station Solar System Sector Solar Facility Type Photovoltaic Developer Tucson Electric Power Location Springerville, Arizona Coordinates 34.1333799°, -109.2859196° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.1333799,"lon":-109.2859196,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

59

Ottawa Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Generating Station Biomass Facility Generating Station Biomass Facility Jump to: navigation, search Name Ottawa Generating Station Biomass Facility Facility Ottawa Generating Station Sector Biomass Facility Type Landfill Gas Location Ottawa County, Michigan Coordinates 42.953023°, -86.0937312° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.953023,"lon":-86.0937312,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

60

Shift Turnover and Log Keeping for Fossil Generating Stations  

Science Conference Proceedings (OSTI)

Decreases in staff productivity, lost generation, and adverse events are occurring in the industry as a result of less-than-effective communication during shift turnovers and log-keeping practices that do not provide sufficient information on plant and equipment status. The shift turnover and log-keeping practices observed at numerous fossil generating stations vary between best in the industry to ineffective, and most stations have had equipment failures and lost efficiencies as a result of less-than-ef...

2010-12-19T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Generation Risk Assessment (GRA) at Cooper Nuclear Station  

Science Conference Proceedings (OSTI)

A previous EPRI guide described how generating plants can implement various forms of component and system models for generation risk assessment (GRA). This report describes a trial application of GRA modeling at the Cooper Nuclear Station and evaluates the usefulness and accuracy of the EPRI GRA guide.

2005-12-06T23:59:59.000Z

62

"1. Braidwood Generation Station","Nuclear","Exelon Nuclear",2330  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois" Illinois" "1. Braidwood Generation Station","Nuclear","Exelon Nuclear",2330 "2. Byron Generating Station","Nuclear","Exelon Nuclear",2300 "3. LaSalle Generating Station","Nuclear","Exelon Nuclear",2238 "4. Baldwin Energy Complex","Coal","Dynegy Midwest Generation Inc",1785 "5. Quad Cities Generating Station","Nuclear","Exelon Nuclear",1774 "6. Dresden Generating Station","Nuclear","Exelon Nuclear",1734 "7. Powerton","Coal","Midwest Generations EME LLC",1538 "8. Elwood Energy LLC","Gas","Dominion Elwood Services Co",1350

63

Navajo Generating Station and Clean-Energy Alternatives: Options for Renewables  

NLE Websites -- All DOE Office Websites (Extended Search)

Navajo Generating Station and Clean-Energy Alternatives: Options for Renewables D.J. Hurlbut, S. Haase, C.S. Turchi, and K. Burman National Renewable Energy Laboratory Produced under direction of the U.S. Department of the Interior by the National Renewable Energy Laboratory (NREL) under Interagency Agreement R11PG30024 and Task No WFJ5.1000. Technical Report NREL/TP-6A20-54706 June 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Navajo Generating Station and

64

Rancho Seco Nuclear Generating Station Decommissioning Experience Report  

Science Conference Proceedings (OSTI)

Several U.S. nuclear power plants entered decommissioning in the 1990s. Based on current information, the next group of plants whose license will expire will not begin decommissioning for nearly a decade. This report provides detailed information on the decommissioning of one plant, the Rancho Seco Nuclear Generating Station, in order to capture its experience for future plants.

2007-12-19T23:59:59.000Z

65

San Onofre Nuclear Generating Station - Unit 1 Decommissioning Experience Report  

Science Conference Proceedings (OSTI)

This report provides detailed information on the successful decommissioning activities of San Onofre Nuclear Generating Station, Unit 1 (SONGS 1). The report describes their experiences and lessons learned for managers of US and international plants beginning or currently engaged in decommissioning.

2008-12-04T23:59:59.000Z

66

Temporary Grounding and Bonding Practices in Nuclear Electric Generating Stations  

Science Conference Proceedings (OSTI)

Correct written temporary grounding practices inside generating stations are an important industrial safety issue, as well as an important plant status control issue. An extraordinary amount of regulations, standards, and information is available for temporary grounding practices in transmission and delivery (T&D), but very little is written about inside plant practices.

2008-12-22T23:59:59.000Z

67

Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts (Revised), Energy Analysis, NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

Navajo Generating Station Navajo Generating Station Navajo Generating Station and Air Visibility Regulations: Alternatives and Impacts David J. Hurlbut, Scott Haase, Gregory Brinkman, Kip Funk, Rachel Gelman, Eric Lantz, Christina Larney, David Peterson, Christopher Worley National Renewable Energy Laboratory Ed Liebsch HDR Engineering, Inc. Prepared under Task No. WFJ5.1000 Technical Report NREL/TP-6A20-53024 * Revised March 2012 Contract No. DE-AC36-08G028308 Produced under direction of the U.S. Department of the Interior by the National Renewable Energy Laboratory (NREL) under Interagency Agreement R11PG30024 and Task No. WFJ5.1000. ERRATA SHEET NREL REPORT/PROJECT NUMBER: NREL/TP-6A20-53024 DOE NUMBER: N/A TITLE: Navajo Generating Station and Air Visibility Regulations: Alternatives and

68

Decommissioning San Onofre Nuclear Generating Station Unit 1 (SONGS-1)  

Science Conference Proceedings (OSTI)

Decommissioning a nuclear power plant and termination of the plant license requires the removal of highly activated materials from inside the nuclear reactor pressure vessel (RPV). Such a task presents a major challenge in terms of technology, project management, and worker exposure. This report documents the approach taken by Southern California Edison (SCE) in their highly successful reactor vessel internals (RVI) segmentation of San Onofre Nuclear Generating Station Unit 1 (SONGS-1). The report detail...

2005-12-12T23:59:59.000Z

69

Operational Surveillance Testing Program for Fossil Generating Stations  

Science Conference Proceedings (OSTI)

The operational surveillance test OST guideline can be used to develop a comprehensive surveillance testing program that enhances the testing performed by operations personnel. The OST programs observed at fossil generating stations contain inconsistencies in the content and in the effectiveness of operational testing. Some industry equipment failures can be attributed to the lack of effective surveillance testing. The bases for OSTs are similar to the bases for the plants preventive maintenance PM progr...

2009-12-23T23:59:59.000Z

70

Check Out the New Alternative Fuel Station Locator | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

alternative fuel vehicle is now easier than ever. This number includes 4,600 electric vehicle charging stations installed by ChargePoint, Ecotality and other charging station...

71

GC GUIDANCE ON ELECTRIC VEHICLE RECHARGING STATIONS | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

ELECTRIC VEHICLE RECHARGING STATIONS GC GUIDANCE ON ELECTRIC VEHICLE RECHARGING STATIONS Several National Laboratory contractors have asked whether appropriated funds may be used...

72

Potomac River Generating Station Dept. of Energy Case No. EO-05-01; September 8, 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Craig A. Glazer Craig A. Glazer Vice President - Federal Government Policy PJM Washington Office (202) 393-7756 .FAX (202) 393-7741 e-mail: glazec@pjm.com CRITICAL ENERGY INFRASTRUCTURE INFORMATION HAS BEEN REMOVED FROM THIS SUBMITTAL FOR PRIVILEGED TREATMENT September 8, 2005 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Dept. of Energy Case No. EO-05-01 Dear Mr. Mansueti: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the unavailability of the Potomac River Generating Station to serve load in the D.C. area.

73

Distributed Generation Study/Dakota Station (Minnegasco) | Open Energy  

Open Energy Info (EERE)

Station (Minnegasco) Station (Minnegasco) < Distributed Generation Study Jump to: navigation, search Study Location Burnsville, Minnesota Site Description Other Utility Study Type Case Study Technology Microturbine Prime Mover Capstone C30 Heat Recovery Systems Unifin Fuel Natural Gas System Installer Capstone Turbine Corp System Enclosure Outdoor System Application Combined Heat and Power Number of Prime Movers 1 Stand-alone Capability None Power Rating 30 kW0.03 MW 30,000 W 30,000,000 mW 3.0e-5 GW 3.0e-8 TW Nominal Voltage (V) 0 Heat Recovery Rating (BTU/hr) 290000 Cooling Capacity (Refrig/Tons) Origin of Controller Manufacturer-Integrated Component Integration Customer Assembled Start Date 2000/03/13 Monitoring Termination Date 2002/03/31 Primary Power Application Based Load

74

Optimal command generation for maneuvering the space station  

E-Print Network (OSTI)

The objective of this research is to obtain near minimum-fuel and minimum-time maneuver commands for large-angle maneuvers for the international space station. Attitude and angular velocity waypoints are generated using the method of differential inclusion. This approach, motivated by the inverse dynamics method, reduces the dimensionality of the discretized problem to be solved. Different types of control schemes are investigated using a combination of Thrusters and Control Moment Gyros. The optimized controls are determined using standard nonlinear optimization methods from the MATLAB program toolboxes. The maneuvers can be completed using considerably less fuel compared to eigen-axis maneuvers currently being implemented for the International Space Station. The differential inclusion method reduces the need for CMG desaturations as compared to a controller similar to the one on board the International Space Station. The near minimum-time results are comparable to eigen-axis maneuvers. The differential inclusion method is flexible and can easily be modified to accommodate the needs of problems with different constraints. The results obtained in this research use approximate models of the space environment and vehicle dynamics; however, the results can easily be used in a higher fidelity optimization.

Bryson, Amy Louise

2001-01-01T23:59:59.000Z

75

Geothermal system saving money at fire station | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geothermal system saving money at fire station Geothermal system saving money at fire station April 9, 2010 - 3:45pm Addthis Joshua DeLung What will the project do? A geothermal...

76

Modeling cooling water discharges from the Burrard Generating Station  

E-Print Network (OSTI)

Abstract-A three-dimensional numerical model was applied to examine the impact of the Burrard Generating Station cooling water on the circulation patterns and thermal regime in the receiving water of Port Moody Arm. A key aspect of this study involved properly incorporating the submerged cooling water buoyant jet into the 3D model. To overcome the scale and interface barriers between the near-field and far-field zones of the buoyant jet, a sub-grid scheme was applied, and the coupled system of equations of motion, heat conservation and state are solved with a single modeling procedure over the complete field. Special care was taken with the diffusion and jet entrainment by using a second order turbulence closure model for vertical diffusion and the Smagorinsky formula for horizontal diffusion as well as jet entrainment. The model was calibrated and validated in terms of buoyant jet trajectory, centerline dilution, and temperature and velocity profiles. Extensive modeling experiments without and with the Burrard Generating Station in operation were then carried out to investigate the receiving water circulations and thermal processes under the influence of the cooling water discharge. The model results reveal that under the influence of the cooling water discharge, peak ebb currents are stronger than peak flood currents in the near-surface layer, and the reverse is true in the near-bottom layer. Meanwhile, the model revealed a well-developed eddy at the southeast side of the buoyant jet in the near-surface layer. It is also found that the warmer water released from the cooling water discharge is mainly confined to the upper layer of the Arm, which is largely flushed out of the Arm through tidal mixing processes, and a corresponding inflow of colder water into the Arm occurs within the lower layer. I.

J. Jiang; D. B. Fissel; D. D. Lemon

2002-01-01T23:59:59.000Z

77

EV Charging Stations Take Off Across America | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Charging Stations Take Off Across America EV Charging Stations Take Off Across America EV Charging Stations Take Off Across America November 19, 2012 - 12:14pm Addthis This ChargePoint station is located in the Columbia River Gorge National Scenic Area in Stevenson, WA, -- an area that is adjacent to the city's shops, restaurants, spas and art galleries. | Photo courtesy of Port of Skamania. This ChargePoint station is located in the Columbia River Gorge National Scenic Area in Stevenson, WA, -- an area that is adjacent to the city's shops, restaurants, spas and art galleries. | Photo courtesy of Port of Skamania. Patrick B. Davis Patrick B. Davis Vehicle Technologies Program Manager ChargePoint America Program deployed chargers in: Boston, MA Bellevue and Redmond, WA Sacramento, CA San Jose and San Francisco Bay Area

78

Orlando Plugs into Electric Vehicle Charging Stations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orlando Plugs into Electric Vehicle Charging Stations Orlando Plugs into Electric Vehicle Charging Stations Orlando Plugs into Electric Vehicle Charging Stations September 8, 2010 - 2:00pm Addthis Nearly 300 electric vehicle charging stations are scheduled to be available throughout the Orlando area next year. File photo Nearly 300 electric vehicle charging stations are scheduled to be available throughout the Orlando area next year. File photo Lindsay Gsell What are the key facts? Coulomb highlighted in the Vice President's report on 100 Recovery Act Projects That Are Changing America Orlando will receive nearly 300 electric vehicle charging systems. 1 of 9 cities receiving charging systems from Coulomb-$15 million in Recovery Act funding. This scene is closer to reality as Orlando, Fla., prepares to get nearly

79

EV Charging Stations Take Off Across America | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Charging Stations Take Off Across America EV Charging Stations Take Off Across America EV Charging Stations Take Off Across America November 19, 2012 - 12:14pm Addthis This ChargePoint station is located in the Columbia River Gorge National Scenic Area in Stevenson, WA, -- an area that is adjacent to the city's shops, restaurants, spas and art galleries. | Photo courtesy of Port of Skamania. This ChargePoint station is located in the Columbia River Gorge National Scenic Area in Stevenson, WA, -- an area that is adjacent to the city's shops, restaurants, spas and art galleries. | Photo courtesy of Port of Skamania. Patrick B. Davis Patrick B. Davis Vehicle Technologies Program Manager ChargePoint America Program deployed chargers in: Boston, MA Bellevue and Redmond, WA Sacramento, CA San Jose and San Francisco Bay Area

80

Next Generation Rooftop Unit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Rooftop Unit Next Generation Rooftop Unit Next Generation Rooftop Unit The U.S. Department of Energy is currently conducting research in a next generation rooftop unit (RTU). More than half of U.S. commercial building space is cooled by packaged heating, ventilation, and air conditioning (HVAC) equipment. Existing rooftop HVAC units consume more than 1.3% of the United States' annual energy usage annually. Project Description This project seeks to evaluate optimal design strategies for significantly improving the efficiency of rooftop units. The primary market for this project is commercial buildings, such as supermarkets and hotels. Project Partners Research is being undertaken through a cooperative research and development agreement (CRADA) between the Department of Energy and Oak Ridge National

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits  

Energy.gov (U.S. Department of Energy (DOE))

Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

82

Find Alternative Fueling Stations and Learn Something, Too | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Find Alternative Fueling Stations and Learn Something, Too Find Alternative Fueling Stations and Learn Something, Too Find Alternative Fueling Stations and Learn Something, Too July 20, 2009 - 7:00pm Addthis Elizabeth Spencer Communicator, National Renewable Energy Laboratory A couple of weeks ago it was hybrid electric vehicle week and, always one to be fashionably late, I thought I'd jump in and talk about some of our fun vehicle-related tools. It's probably pretty obvious from the sorts of posts I've done in the past, but I love interactive tools and applications on the Web. EERE has a number of interesting applications and gadgets, and today I thought I'd talk about a few hiding in the Alternative Fuels and Advanced Vehicles Data Center (hereafter referred to as the AFDC.) First off: the Alternative Fueling Station Locator (also available for

83

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period October 1, 2003-December 31, 2003, Allegheny Energy Supply Co., LLC (Allegheny) continued with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of biomass cofiring into commercial operations, including evaluating new sources of biomass supply. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2004-01-01T23:59:59.000Z

84

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period April 1, 2003--June 30, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of biomass cofiring into commercial operations. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2003-07-01T23:59:59.000Z

85

Geothermal system saving money at fire station | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geothermal system saving money at fire station Geothermal system saving money at fire station Geothermal system saving money at fire station April 9, 2010 - 3:45pm Addthis Joshua DeLung What will the project do? A geothermal heating and cooling system has enabled the substation to save taxpayers $15,000 annually when compared to a traditional system. The high temperature of the treatment building's water helps reduce the amount of energy needed to heat water in the substation. An environmentally friendly geothermal heating and cooling system in Pennsylvania will save taxpayers $15,000 a year as part of a new fire substation that will decrease emergency response times. The Alpha Fire Co. celebrated the opening of substation on the ground floor of the College Township municipal building earlier this year in State

86

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period January 1, 2003--March 31, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with improvements to both the Willow Island and Albright Generating Station cofiring systems. These improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2003-04-30T23:59:59.000Z

87

"1. Mystic Generating Station","Gas","Boston Generating LLC",1968  

U.S. Energy Information Administration (EIA) Indexed Site

Massachusetts" Massachusetts" "1. Mystic Generating Station","Gas","Boston Generating LLC",1968 "2. Brayton Point","Coal","Dominion Energy New England, LLC",1545 "3. Canal","Petroleum","Mirant Canal LLC",1119 "4. Northfield Mountain","Pumped Storage","FirstLight Power Resources Services LLC",1080 "5. Salem Harbor","Coal","Dominion Energy New England, LLC",744 "6. Fore River Generating Station","Gas","Boston Generating LLC",688 "7. Pilgrim Nuclear Power Station","Nuclear","Entergy Nuclear Generation Co",685 "8. Bear Swamp","Pumped Storage","Brookfield Power New England",600

88

Energy Department Invests $60 Million to Train Next Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology Energy Department Invests 60 Million to Train Next Generation Nuclear Energy...

89

Energy Department Announces New Investments to Train Next Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Train Next Generation of Nuclear Energy Leaders, Advance University-Led Nuclear Innovation Energy Department Announces New Investments to Train Next Generation of Nuclear Energy...

90

Bush Hydrogen Vision "Fueled" By California Station Opening | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bush Hydrogen Vision "Fueled" By California Station Opening Bush Hydrogen Vision "Fueled" By California Station Opening Bush Hydrogen Vision "Fueled" By California Station Opening February 18, 2005 - 10:26am Addthis CHINO, CALIF. - In a major step toward achieving President George W. Bush's vision for a hydrogen economy, Assistant Secretary of Energy David Garman today joined representatives of ChevronTexaco, Hyundai-Kia and UTC Fuel Cells at the opening of a hydrogen fueling station in Chino, CA. The station is a major part of the Department of Energy's Hydrogen "Learning Demonstration," which brings together automobile makers and energy companies to test fuel cell vehicles and hydrogen fueling systems in real-world conditions. "Hydrogen fuel cells represent one of the most encouraging, innovative

91

Bush Hydrogen Vision "Fueled" By California Station Opening | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydrogen Vision "Fueled" By California Station Opening Hydrogen Vision "Fueled" By California Station Opening Bush Hydrogen Vision "Fueled" By California Station Opening February 18, 2005 - 10:26am Addthis CHINO, CALIF. - In a major step toward achieving President George W. Bush's vision for a hydrogen economy, Assistant Secretary of Energy David Garman today joined representatives of ChevronTexaco, Hyundai-Kia and UTC Fuel Cells at the opening of a hydrogen fueling station in Chino, CA. The station is a major part of the Department of Energy's Hydrogen "Learning Demonstration," which brings together automobile makers and energy companies to test fuel cell vehicles and hydrogen fueling systems in real-world conditions. "Hydrogen fuel cells represent one of the most encouraging, innovative

92

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gas emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.

K. Payette; D. Tillman

2001-10-01T23:59:59.000Z

93

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period July 1, 2003-September 30, 2003, Allegheny Energy Supply Co., LLC (Allegheny) proceeded with demonstration operations at the Willow Island Generating Station and improvements to the Albright Generating Station cofiring systems. The demonstration operations at Willow Island were designed to document integration of bio mass cofiring into commercial operations, including evaluating new sources of biomass supply. The Albright improvements were designed to increase the resource base for the projects, and to address issues that came up during the first year of operations. During this period, a major presentation summarizing the program was presented at the Pittsburgh Coal Conference. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations.

K. Payette; D. Tillman

2003-10-01T23:59:59.000Z

94

Biofouling Control With Ozone at the Bergen Generating Station  

Science Conference Proceedings (OSTI)

Tests were conducted to evaluate the effectiveness of ozone as an alternative to chlorine for condenser biofouling control in a once-through cooling system. A pilot-scale test facility with three model condensors simulated condenser operation and conditions at the Bergen station. Both ozone and chlorine were tested. The minimum effective level of each was determined by daily measurements of heat transfer coefficients across model condenser tubes and/or water-side pressure drop. Final evaluation was based...

1980-11-01T23:59:59.000Z

95

Re: Potomac River Generating Station Department of Energy, Case...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the planned outage of the 230 kV circuits serving the Potomac River Substation, and through that...

96

Fuel Examination and Crud Analysis from Columbia Generating Station EOC20  

Science Conference Proceedings (OSTI)

At the Columbia Generating Station end of cycle-20 (EOC-20) refueling outage, 2- and 3-cycle ATRIUM-10 fuel assemblies were examined to assess the impact of reduced Cycle 20 feedwater iron (Fe) and zinc (Zn) transport on crud loadings of fuel and fuel performance in general.BackgroundCrud spallation was observed on 2- and 3-cycle fuel at Columbia Generating Station (CGS) during EOC19. This observation was linked to moderate feedwater (FW) zinc (Zn) and iron ...

2013-09-05T23:59:59.000Z

97

Main Generator Seal Oil Supply Reliability Improvements at Southern California Edison's San Onofre Nuclear Generating Station  

Science Conference Proceedings (OSTI)

This paper presents the justification for the approach, details and results of the Main Generator Seal Oil System reliability enhancements on the San Onofre Nuclear Generating Station, SONGS. The SONGS, Unit 3 experienced substantial turbine damage in early 2001 after the turbine bearings lubrication oil supply failed. During a loss of off-site power incident, power was lost to the two AC powered turbine lubrication oil pumps due to a breaker failure in the switchgear and the DC powered emergency bearing lubricating oil pump failed to start due to a breaker trip. The SONGS turbine generators coasted down from full speed to a full stop without lubricating oil. This resulted in significant bearing, journal and steam path damage that required a four-month duration repair outage during a time period where electricity was in short supply in the State of California. The generator hydrogen sealing system remained operable during this event, however it was recognized during the event follow up investigation that this system had vulnerabilities to failure similar to the bearing lubrication system. In order to prevent a reoccurrence of this extremely costly event, SONGS has taken actions to modify both of these critical turbine generator systems by adding additional, continuously operating pumps with a new, independent power source and independently routed cables. The main challenge was to integrate the additional equipment into the existing lubrication and seal oil systems. The lubrication Oil System was the first system to be retro-fitted and these results already have been presented. Reference 2. This paper provides the result of the reliability enhancements for the Main Generator Seal Oil System, which concludes the turbine/generator critical oil systems reliability improvements, performed by SONGS. It is worth noting that the design team discovered and corrected a number of other significant operational issues, which had been present from the early days and also learned a great deal of detailed information about this vital system during the project. The SONGS approach and findings are discussed in this paper, as well as a summary of the work performed. This technical paper will be of interest to utilities with a need to improve turbine generator reliability issues. (authors)

Simma, Fred Y.; Chetwynd, Russell J. [Southern California Edison, P.O. Box 800, Rosemead, CA 91770 (United States); Rowe, Stuart A. [Alstom Power Service (United States)

2006-07-01T23:59:59.000Z

98

Chapter 2 Generation Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Adequacy Chapter 2 Generation Adequacy Chapter 2 Generation Adequacy Chapter 2 Generation Adequacy More Documents & Publications Chapter 1: Keeping the Lights on in the...

99

Life Cycle Management Plan for Main Generator and Exciter at Palo Verde Nuclear Generating Station: Generic Version  

Science Conference Proceedings (OSTI)

As the electric power industry becomes more competitive, life cycle management (LCM) of systems, structures, and components (SSCs) becomes more important to keep nuclear power plants economically viable throughout their remaining licensed operating terms, whether 40 or 60 years. This report provides an optimized LCM plan for the main generators and exciters at the Palo Verde Nuclear Generating Station (PVNGS).

2003-09-30T23:59:59.000Z

100

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Navajo Generating Station and Clean-Energy Alternatives: Options for Renewables  

DOE Green Energy (OSTI)

In January 2012, the National Renewable Energy Laboratory delivered to the Department of the Interior the first part of a study on Navajo Generating Station (Navajo GS) and the likely impacts of BART compliance options. That document establishes a comprehensive baseline for the analysis of clean energy alternatives, and their ability to achieve benefits similar to those that Navajo GS currently provides. This analysis is a supplement to NREL's January 2012 study. It provides a high level examination of several clean energy alternatives, based on the previous analysis. Each has particular characteristics affecting its relevance as an alternative to Navajo GS. It is assumed that the development of any alternative resource (or portfolio of resources) to replace all or a portion of Navajo GS would occur at the end of a staged transition plan designed to reduce economic disruption. We assume that replacing the federal government's 24.3% share of Navajo GS would be a cooperative responsibility of both the U.S. Bureau of Reclamation (USBR) and the Central Arizona Water Conservation District (CAWCD).

Hurlbut, D. J.; Haase, S.; Turchi, C. S.; Burman, K.

2012-06-01T23:59:59.000Z

102

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period October 1, 2002--December 31, 2002, Allegheny Energy Supply Co., LLC (Allegheny) completed the first year of testing at the Willow Island cofiring project. This included data acquisition and analysis associated with certain operating parameters and environmental results. Over 2000 hours of cofiring operation were logged at Willow Island, and about 4,000 tons of sawdust were burned along with slightly more tire-derived fuel (TDF). The results were generally favorable. During this period, also, a new grinder was ordered for the Albright Generating Station to handle oversized material rejected by the disc screen. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the test results at Willow Island and summarizes the grinder program at Albright.

K. Payette; D. Tillman

2003-01-01T23:59:59.000Z

103

Clearance and Tagging Guideline for Fossil Electric Generating Stations  

Science Conference Proceedings (OSTI)

In their trips to more than a dozen plants in the past three years, Electric Power Research Institute (EPRI) teams observed that clearance and tagging processes have ranged from comprehensive to less than adequate. In plants with detailed procedures and plants with less than adequate procedures, activities have been observed that were not as safe as they should have been. EPRI and fossil generating advisors determined that a clearance and tagging guideline was needed. EPRI and the industry advisors decid...

2008-03-26T23:59:59.000Z

104

New Energy Department Team Established to Help Local Authorities Get Gas Stations Impacted by Hurricane Sandy Back Online  

Energy.gov (U.S. Department of Energy (DOE))

As part of the government-wide effort to assist the response and recovery efforts following Hurricane Sandy, the Energy Department has established a team to assist local authorities in their efforts to get help get gas stations back online.

105

DESIGNING AND OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period July 1, 2000-March 31, 2004, Allegheny Energy Supply Co., LLC (Allegheny) conducted an extensive demonstration of woody biomass cofiring at its Willow Island and Albright Generating Stations. This demonstration, cofunded by USDOE and Allegheny, and supported by the Biomass Interest Group (BIG) of EPRI, evaluated the impacts of sawdust cofiring in both cyclone boilers and tangentially-fired pulverized coal boilers. The cofiring in the cyclone boiler--Willow Island Generating Station Unit No.2--evaluated the impacts of sawdust alone, and sawdust blended with tire-derived fuel. The biomass was blended with the coal on its way to the combustion system. The cofiring in the pulverized coal boiler--Albright Generating Station--evaluated the impact of cofiring on emissions of oxides of nitrogen (NO{sub x}) when the sawdust was injected separately into the furnace. The demonstration of woody biomass cofiring involved design, construction, and testing at each site. The results addressed impacts associated with operational issues--capacity, efficiency, and operability--as well as formation and control of airborne emissions such as NO{sub x}, sulfur dioxide (SO{sub 2}2), opacity, and mercury. The results of this extensive program are detailed in this report.

K. Payette; D. Tillman

2004-06-01T23:59:59.000Z

106

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION  

DOE Green Energy (OSTI)

During the period October 1, 2001--December 31, 2001, Allegheny Energy Supply Co., LLC (Allegheny) completed construction of the Willow Island cofiring project. This included completion of the explosion proof electrical wiring, the control system, and the control software. Procedures for system checkout, shakedown, and initial operation were initiated during this period. During this time period the 100-hour test of the Albright Generating Station cofiring facility was completed. The testing demonstrated that cofiring at the Albright Generating Station could reliably contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gas emissions over a significant load range. During this period of time Allegheny Energy conducted facility tours of both Albright and Willow Island for the Biomass Interest Group of the Electric Power Research Institute. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the completion of construction activities at the Willow Island site along with the 100-hr test at the Albright site.

K. Payette; D. Tillman

2002-01-01T23:59:59.000Z

107

Modeling of a horizontal steam generator for the submerged nuclear power station concept  

SciTech Connect

A submerged nuclear power station has been proposed as an alternative power station with a relatively low environmental impact for use by both industrialized and developing countries. The station would be placed 10 m above the seabed at a depth of 30--100 m and a distance of 10--30 km from shore. The submerged nuclear power station would be manufactured and refueled in a central facility, thus gaining the economies of factoryfabrication and the flexibility of short-lead-time deployment. To minimize the size of the submerged hull, horizontal steam generators are proposed for the primary-to-secondary heat transfer, instead of the more traditional vertical steam generators. The horizontal steam generators for SNPS would be similar in design to the horizontal steam generators used in the N-Reactors except the tube orientation is horizontal (the tube`s inlet and outlet connection points on the tubesheet are at the same elevation). Previous RELAP5 input decks for horizontal steam generators have been either very simplistic (Loviisa PWR) or used a vertical tube orientation (N-Reactor). This paper will present the development and testing of a RELAP5 horizontal steam generator model, complete with a simple secondary water level control system, that accounts for the dynamic flow conditions which exist inside horizontal steam generators.

Palmrose, D.E.; Herring, J.S.

1993-05-01T23:59:59.000Z

108

Modeling of a horizontal steam generator for the submerged nuclear power station concept  

Science Conference Proceedings (OSTI)

A submerged nuclear power station has been proposed as an alternative power station with a relatively low environmental impact for use by both industrialized and developing countries. The station would be placed 10 m above the seabed at a depth of 30--100 m and a distance of 10--30 km from shore. The submerged nuclear power station would be manufactured and refueled in a central facility, thus gaining the economies of factoryfabrication and the flexibility of short-lead-time deployment. To minimize the size of the submerged hull, horizontal steam generators are proposed for the primary-to-secondary heat transfer, instead of the more traditional vertical steam generators. The horizontal steam generators for SNPS would be similar in design to the horizontal steam generators used in the N-Reactors except the tube orientation is horizontal (the tube's inlet and outlet connection points on the tubesheet are at the same elevation). Previous RELAP5 input decks for horizontal steam generators have been either very simplistic (Loviisa PWR) or used a vertical tube orientation (N-Reactor). This paper will present the development and testing of a RELAP5 horizontal steam generator model, complete with a simple secondary water level control system, that accounts for the dynamic flow conditions which exist inside horizontal steam generators.

Palmrose, D.E.; Herring, J.S.

1993-01-01T23:59:59.000Z

109

Talkin' Bout Wind Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Solar Generation Has a Bright Future Talkin' Bout Wind Generation Get Daily Energy Analysis Delivered to Your Website Natural Gas Production and U.S. Oil Imports...

110

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

111

Economic Dispatch of Electric Generation Capacity | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Economic Dispatch of Electric Generation Capacity Economic Dispatch of Electric Generation Capacity A report to congress and the states pursuant to sections 1234 and 1832 of the...

112

Renewable Generation Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Requirement Renewable Generation Requirement Eligibility Investor-Owned Utility Retail Supplier Savings For Bioenergy Buying & Making Electricity Water Solar Heating &...

113

Renewable Electricity Generation | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Electricity Generation Renewable Electricity Generation Geothermal Read more Solar Read more Water Read more Wind Read more Our nation has abundant solar, water, wind,...

114

Energy Department Invests $60 Million to Train Next Generation Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Invests $60 Million to Train Next Generation Energy Department Invests $60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology Energy Department Invests $60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology September 20, 2013 - 1:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's Climate Action Plan to continue America's leadership in clean energy innovation, the Energy Department announced today more than $60 million in nuclear energy research awards and improvements to university research reactors and infrastructure. The 91 awards announced today will help train and educate the next generation of leaders in America's nuclear industry as well as support new and advanced nuclear technologies from reactor materials to innovative

115

Supplemental Comments on the Department of Energy's Emergency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Supplemental Comments on the Department of Energy's Emergency Order...

116

To Generate, or Not to Generate? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

To Generate, or Not to Generate? To Generate, or Not to Generate? To Generate, or Not to Generate? April 9, 2012 - 6:06pm Addthis Amanda McAlpin What could be more liberating than providing your own electricity, and not getting a bill each month? With a small renewable energy system, you can use alternative sources to create energy-maybe even enough to power your entire home. There are several options to choose from when considering a renewable energy system, such as solar electric systems, which can gather sun even from scattered areas. Solar electric systems can also be used as outdoor lighting. If this perks your interest, read considerations for installing a small solar electric system for a helpful list of questions to ask when selecting a qualified contractor to install one in your home.

117

To Generate, or Not to Generate? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

To Generate, or Not to Generate? To Generate, or Not to Generate? To Generate, or Not to Generate? April 9, 2012 - 6:06pm Addthis Amanda McAlpin What could be more liberating than providing your own electricity, and not getting a bill each month? With a small renewable energy system, you can use alternative sources to create energy-maybe even enough to power your entire home. There are several options to choose from when considering a renewable energy system, such as solar electric systems, which can gather sun even from scattered areas. Solar electric systems can also be used as outdoor lighting. If this perks your interest, read considerations for installing a small solar electric system for a helpful list of questions to ask when selecting a qualified contractor to install one in your home.

118

Department of Energy Awards $957,000 to Next Generation Economy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

957,000 to Next Generation Economy Community Reuse Organization Department of Energy Awards 957,000 to Next Generation Economy Community Reuse Organization Department of Energy...

119

Small Generator Aggregation (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generator Aggregation (Maine) Generator Aggregation (Maine) Small Generator Aggregation (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maine Program Type Green Power Purchasing Provider Public Utilities Commission This section establishes requirements for electricity providers to purchase

120

Renewable Electricity Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Electricity Generation Renewable Electricity Generation Renewable Electricity Generation Geothermal Read more Solar Read more Water Read more Wind Read more Our nation has abundant solar, water, wind, and geothermal energy resources, and many U.S. companies are developing, manufacturing, and installing cutting-edge, high-tech renewable energy systems. The Office of Energy Efficiency and Renewable Energy (EERE) leads a large network of researchers and other partners to deliver innovative technologies that will make renewable electricity generation cost competitive with traditional sources of energy. Working with our national laboratories and through these partnerships, we are catalyzing the transformation of the nation's energy system and building on a tradition of U.S. leadership in science and

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Generation IV International Forum | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forum Forum Generation IV International Forum January 14, 2005 - 9:50am Addthis Remarks of Secretary of Energy Spencer Abraham National Press Club It is a pleasure to be here today, to welcome the representatives of the Generation IV International Forum to their first Washington, D.C., meeting. Very early in my tenure as U.S. Secretary of Energy, I took part in the formation of the Generation IV initiative, and the signing of the organization's charter - which provided the framework for international cooperative research on advanced nuclear energy systems that are safe, reliable, economical and proliferation resistant... to help ensure that nuclear power has a vital and viable role in the world's energy future. I last met with the Generation IV International Forum two years ago in

122

Distributed Generation Standard Contracts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island enacted legislation (H.B. 6104) in June 2011 establishing a feed-in tariff for new distributed renewable energy generators up to three megawatts (MW) in...

123

Department of Energy Reply to Congressman James P. Moran | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Department of Energy Emergency...

124

Registration of Electric Generators (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Registration of Electric Generators (Connecticut) Registration of Electric Generators (Connecticut) Registration of Electric Generators (Connecticut) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State Connecticut Program Type Generation Disclosure Provider Department of Energy and Environmental Protection All electric generating facilities operating in the state, with the

125

Assessment of Low Pressure Turbine Exhaust System Improvements at Mayo Generating Station  

Science Conference Proceedings (OSTI)

This report describes extensive analyses and tests conducted on Carolina Power and Light's (CP&L's) Mayo Generating Station low pressure turbines to investigate the possibility of achieving heat rate reductions through modification to the turbine exhaust hood. Field results showed slightly less exhaust loss than anticipated from the manufacturer's thermal kit data, suggesting less potential for gains derived from hood improvements. Analytical work with computational fluid dynamic (CFD) models supported t...

1998-01-13T23:59:59.000Z

126

Property Damage Risk Assessment Scoping Study: for South Texas Project Electric Generating Station  

Science Conference Proceedings (OSTI)

At the request of the South Texas Project Electric Generating Station (STPEGS), EPRI assessed the financial risks of on-site property damage from component failures and accidents and the effectiveness of available insurance in mitigating such risks. This report quantifies the risks of nuclear and nonnuclear accidents and the resulting property damage incurred. The report is a companion document to EPRI's Nuclear Property Insurance Study (TR-108061), which discusses five options for alternate insurance co...

1997-08-12T23:59:59.000Z

127

Confirmatory Survey Results for the Reactor Building Dome Upper Surfaces, Rancho Saco Nuclear Generating Station  

SciTech Connect

Results from a confirmatory survey of the upper structural surfaces of the Reactor Building Dome at the Rancho Seco Nuclear Generating Station (RSNGS) performed by the Oak Ridge Institute for Science and Education for the NRC. Also includes results of interlaboratory comparison analyses on several archived soil samples that would be provided by RSNGS personnel. The confirmatory surveys were performed on June 7 and 8, 2006.

Wade C. Adams

2006-10-25T23:59:59.000Z

128

Energy Department Announces New Investment to Accelerate Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Accelerate Next to Accelerate Next Generation Biofuels Energy Department Announces New Investment to Accelerate Next Generation Biofuels July 1, 2013 - 1:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON -- Building on President Obama's plan to cut carbon pollution and announced this week, the Energy Department today announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel and jet fuels from biomass. The projects - located in Oklahoma, Tennessee, Utah and Wisconsin - represent a $13 million Energy Department investment. "By partnering with private industry, universities and our national labs, we can increase America's energy security, bolster rural economic development and cut harmful carbon pollution from our cars, trucks and

129

Energy Department Announces Investment to Accelerate Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investment to Accelerate Next Investment to Accelerate Next Generation Biofuels Energy Department Announces Investment to Accelerate Next Generation Biofuels July 1, 2013 - 4:37pm Addthis Following last week's rollout of President Obama's plan to cut carbon pollution, the Energy Department today announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel, and jet fuels from biomass. The projects-located in Oklahoma, Tennessee, Utah, and Wisconsin-represent a $13 million Energy Department investment. "By partnering with private industry, universities and our national labs, we can increase America's energy security, bolster rural economic development, and cut harmful carbon pollution from our cars, trucks and

130

Fueling the Next Generation of Vehicle Technology | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fueling the Next Generation of Vehicle Technology Fueling the Next Generation of Vehicle Technology Fueling the Next Generation of Vehicle Technology February 6, 2013 - 11:20am Addthis Professor Jack Brouwer, Associate Director and Chief Technology Officer of the National Fuel Cell Research Center, points out the tri-generation facility that uses biogas from Orange County Sanitation District’s wastewater treatment plant to produce hydrogen, heat and power. | Photo courtesy of the Energy Department. Professor Jack Brouwer, Associate Director and Chief Technology Officer of the National Fuel Cell Research Center, points out the tri-generation facility that uses biogas from Orange County Sanitation District's wastewater treatment plant to produce hydrogen, heat and power. | Photo courtesy of the Energy Department.

131

Energy Replacement Generation Tax Exemption | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement Generation Tax Exemption Replacement Generation Tax Exemption Energy Replacement Generation Tax Exemption < Back Eligibility Commercial Industrial Local Government Residential Savings Category Water Buying & Making Electricity Bioenergy Wind Maximum Rebate None Program Info Start Date 01/01/2008 (retroactively effective) State Iowa Program Type Corporate Exemption Rebate Amount 100% exemption for self-generators, landfill gas and wind Reduced rate for large hydro Provider Iowa Department of Revenue Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax on generation facilities. Under the Energy Replacement Generation Tax Exemption, the following

132

New Investments to Accelerate Next Generation Biofuels | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investments to Accelerate Next Generation Biofuels Investments to Accelerate Next Generation Biofuels New Investments to Accelerate Next Generation Biofuels July 1, 2013 - 12:00pm Addthis Image of a scientist studying one of three containers of biomass materials. Following last week's rollout of President Obama's plan to cut carbon pollution, the Energy Department today announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel, and jet fuels from biomass. The projects-located in Oklahoma, Tennessee, Utah, and Wisconsin-represent a $13 million Energy Department investment. "By partnering with private industry, universities and our national labs, we can increase America's energy security, bolster rural economic

133

Energy Department Invests $60 Million to Train Next Generation Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60 Million to Train Next Generation 60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology Energy Department Invests $60 Million to Train Next Generation Nuclear Energy Leaders, Pioneer Advanced Nuclear Technology September 20, 2013 - 1:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's Climate Action Plan to continue America's leadership in clean energy innovation, the Energy Department announced today more than $60 million in nuclear energy research awards and improvements to university research reactors and infrastructure. The 91 awards announced today will help train and educate the next generation of leaders in America's nuclear industry as well as support new and advanced nuclear technologies from reactor materials to innovative

134

Microsoft Word - CX-RooseveltRadioStationGeneratorFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2013 7, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Molly Kovaka Project Manager - TEP CSB-2 Proposed Action: Roosevelt Radio Station Emergency Generator Removal and Replacement Budget Information: Work Order # 300238 / 300235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately four miles north of Arlington, Oregon, in Klickitat County, Washington. T3N, R21E, Sec14 and Sec 6. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to maintain and improve the Roosevelt Radio Station. The proposed work includes removal and replacement of the existing 30-kilowatt

135

Department of Energy Awards $300,000 Grant to Next Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Economy Inc. Department of Energy Awards 300,000 Grant to Next Generation Economy Inc. Department of Energy Awards 300,000 Grant to Next Generation Economy Inc....

136

Life Cycle Management Plan for Main Generator and Exciter at Wolf Creek Generating Station: Generic Version  

Science Conference Proceedings (OSTI)

As the electric power industry becomes more competitive, life cycle management (LCM) of systems, structures, and components (SSCs) becomes more important to keep nuclear power plants economically viable throughout their remaining licensed operating terms, whether 40 or 60 years. This report provides Wolf Creek Nuclear Operating Corp. with an optimized LCM plan for the main generators and exciters at Wolf Creek Power Plant.

2003-09-30T23:59:59.000Z

137

Solar Generation Has a Bright Future | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Has a Bright Future Generation Has a Bright Future Solar Generation Has a Bright Future September 12, 2012 - 3:06pm Addthis Growth of Solar Power Electricity Generation in the United States, 1999-2013 | Chart provided by the U.S. Energy Information Administration Growth of Solar Power Electricity Generation in the United States, 1999-2013 | Chart provided by the U.S. Energy Information Administration Matthew Loveless Matthew Loveless Data Integration Specialist, Office of Public Affairs The amount of electricity the United States generates from solar power has started to grow rapidly and is projected to reach 18,000 megawatt hours per day in 2013. A growing solar industry presents a tremendous economic opportunity for the United States, and that is why the Energy Department's SunShot Initiative

138

Mentoring Our Future Generation of STEM Professionals | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mentoring Our Future Generation of STEM Professionals Mentoring Our Future Generation of STEM Professionals Mentoring Our Future Generation of STEM Professionals March 30, 2011 - 4:50pm Addthis Bill Valdez Bill Valdez Principal Deputy Director How can I participate? Female STEM students in the Washington, D.C. metropolitan area are encouraged to apply and female employees at the Department's headquarters are encouraged to sign up as mentors. Visit http://diversity.energy.gov for more information. Yesterday, the Department of Energy unveiled a new mentoring program to pair female undergraduate science, engineering and math students in the Washington, D.C., area with female employees who specialize in those subject areas. The program aims to introduce the students to successful women in science and technology, giving the pairs the opportunity to shape

139

Next Generation Safeguards Initiative Inaugural Conference | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Safeguards Initiative Inaugural Conference Next Generation Safeguards Initiative Inaugural Conference Next Generation Safeguards Initiative Inaugural Conference September 12, 2008 - 3:20pm Addthis Remarks as Prepared for Energy Secretary Samuel Bodman Thank you, Ken, and all of you for that generous welcome. It is good to see so many of you here today for this discussion of a topic I consider to be among the most important in the Energy Department's portfolio. The U.S. Department of Energy has the responsibility for maintaining the safety and security of the U.S. nuclear stockpile. It is a responsibility I want you to know I take very personally. Thanks to the good work of Sen. Richard Lugar and others, we have the responsibility, through our National Nuclear Security Administration, to help other nations - especially the independent states that were once part

140

Impact of Electric Generating Facilities (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact of Electric Generating Facilities (Virginia) Impact of Electric Generating Facilities (Virginia) Impact of Electric Generating Facilities (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Environmental Regulations Siting and Permitting Provider Virginia Department of Environmental Quality After a proposed power plant has received approval from the State Corporation Commission (SCC) and location approval from the local government, it must apply for all applicable permits from the Virginia

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Meteorological Processes Affecting the Transport of Emissions from the Navajo Generating Station to Grand Canyon National Park  

Science Conference Proceedings (OSTI)

During the 1990 Navajo Generating Station (NGS) Winter Visibility Study, a network of surface and upper-air meteorological measurement systems was operated in and around Grand Canyon National Park to investigate atmospheric processes in complex ...

Charles G. Lindsey; Jun Chen; Timothy S. Dye; L. Willard Richards; Donald L. Blumenthal

1999-08-01T23:59:59.000Z

142

Staff Draft Report. Comparative Cost of California Central Station Electricity Generation Technologies.  

DOE Green Energy (OSTI)

This Energy Commission staff draft report presents preliminary levelized cost estimates for several generic central-station electricity generation technologies. California has traditionally adopted energy policies that balance the goals of supporting economic development, improving environmental quality and promoting resource diversity. In order to be effective, such policies must be based on comprehensive and timely gathering of information. With this goal in mind, the purpose of the report is to provide comparative levelized cost estimates for a set of renewable (e.g., solar) and nonrenewable (e.g., natural gas-fired) central-station electricity generation resources, based on each technology's operation and capital cost. Decision-makers and others can use this information to compare the generic cost to build specific technology. These costs are not site specific. If a developer builds a specific power plant at a specific location, the cost of siting that plant at that specific location must be considered. The Energy Commission staff also identifies the type of fuel used by each technology and a description of the manner in which the technology operates in the generation system. The target audiences of this report are both policy-makers and anyone wishing to understand some of the fundamental attributes that are generally considered when evaluating the cost of building and operating different electricity generation technology resources. These costs do not reflect the total cost to consumers of adding these technologies to a resources portfolio. These technology characterizations do not capture all of the system, environmental or other relevant attributes that would typically be needed by a portfolio manager to conduct a comprehensive ''comparative value analysis''. A portfolio analysis will vary depending on the particular criteria and measurement goals of each study. For example, some form of firm capacity is typically needed with wind generation to support system reliability. [DJE-2005

Badr, Magdy; Benjamin, Richard

2003-02-11T23:59:59.000Z

143

Staff Draft Report. Comparative Cost of California Central Station Electricity Generation Technologies.  

SciTech Connect

This Energy Commission staff draft report presents preliminary levelized cost estimates for several generic central-station electricity generation technologies. California has traditionally adopted energy policies that balance the goals of supporting economic development, improving environmental quality and promoting resource diversity. In order to be effective, such policies must be based on comprehensive and timely gathering of information. With this goal in mind, the purpose of the report is to provide comparative levelized cost estimates for a set of renewable (e.g., solar) and nonrenewable (e.g., natural gas-fired) central-station electricity generation resources, based on each technology's operation and capital cost. Decision-makers and others can use this information to compare the generic cost to build specific technology. These costs are not site specific. If a developer builds a specific power plant at a specific location, the cost of siting that plant at that specific location must be considered. The Energy Commission staff also identifies the type of fuel used by each technology and a description of the manner in which the technology operates in the generation system. The target audiences of this report are both policy-makers and anyone wishing to understand some of the fundamental attributes that are generally considered when evaluating the cost of building and operating different electricity generation technology resources. These costs do not reflect the total cost to consumers of adding these technologies to a resources portfolio. These technology characterizations do not capture all of the system, environmental or other relevant attributes that would typically be needed by a portfolio manager to conduct a comprehensive ''comparative value analysis''. A portfolio analysis will vary depending on the particular criteria and measurement goals of each study. For example, some form of firm capacity is typically needed with wind generation to support system reliability. [DJE-2005

Badr, Magdy; Benjamin, Richard

2003-02-11T23:59:59.000Z

144

Environmental radiological studies in 1989 near the Rancho Seco Nuclear Power Generating Station  

SciTech Connect

In December 1988, the Sacramento Municipal Utilities District (SMUD) asked the Lawrence Livermore National Laboratory's (LLNL) Environmental Sciences Division (ENV) to collect sediment, water,and fish samples downstream from the Rancho Seco Nuclear Power Generating Station for analysis of radionuclides to compare with results from earlier surveys in 1984 through 1987 (1--8). ENV was, however, asked to reduce the total number of sample collections to a minimum in this study because of financial constraints. The proposal ENV submitted for the 1989 Environmental Radiological Studies downstream of the Rancho Seco Nuclear Power Generating Station reflected this reduction, but we believe, nevertheless, the 1989 efforts do allow us to make some meaningful comparisons with the previous studies. Cesium-137 is the most significant radionuclide still observed downstream from the Rancho Seco Nuclear Power Plant. Only occasionally is {sup 134}Cs or {sup 60}CO observed. In 1989, the concentration of {sup 137}Cs in the water and fish decreased with distance from the plant to the same level that is was in 1987, and was lower than it had been from 1984 through 1986. The concentration ratio (CR) for {sup 137}Cs in fish is between 1000 and 1500, which is below the NRC default value of 2000. Physical mixing in the creek environment has moved the {sup 137}Cs deeper into the sediment column, thereby reducing the concentration in the top 12 cm relative to that in previous years. 8 refs., 18 figs., 9 tabs.

Robison, W.L.; Wong, Kai M.; Jones, H.E.

1990-11-01T23:59:59.000Z

145

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia http:energy.govoedownloads...

146

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concerning the 2005-2007 Emergency Reliability Orders Concerning the Potomac River Generating Station under Section 202(c) of the Federal Power Act The Department of...

147

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy-storage-systems-2007-peer-review-economics-presentations Download Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power...

148

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

operational-issues-environmental-restoration-disposal-facility Download Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power...

149

Radiological characterization of main cooling reservoir bottom sediments at The South Texas Project Electrical Generating Station  

E-Print Network (OSTI)

The South Texas Project Electrical Generating Station (STPEGS operating license directs that an effective radiological environmental monitoring program be established. Site- specific data should then augment the generation of an accurate dose model. The purpose of this study was to accurately profile the radionuclide distribution of important gamma emitting nuclides and their concentrations in the bottom sediment of the STPEGS main cooling reservoir (MCR). A Loran-C navigation system was used in conjunction with a compass to locate sampling stations. A DietzLafond bottom sampler was used to collect 70 sediment samples from 56 stations with 14 stations being sampled in duplicate. Sample analysis utilized proven standardized procedures and conventional gamma spectroscopy techniques to analyze a typical 0.7 kg sample. Count times were 6-15 hrs depending on the measurability of the radionuclide of interest or the lower limit of detection (approximately 9 pCi/kg dry) for "58CO, '60CO, and 137Cs. An inventory of "58Co, 6OCo, and 137CS in the MCR was estimated from plant effluent release records. Comparisons were made between the release records and the totals derived from the analysis of the bottom sediment. A predictive model of MCR bottom sediment activity was made. The reservoir's '60Co inventory is predicted to increase to 9.2 Ci by the year 2029. The analysis of bottom sediments suggests that 42% of the 60Co is captured in the sediment; however, analysis of other MCR media (e.g., water, biologicals) suggests that the retention percentage is in fact significantly greater. The majority of the '60Co laden sediment is found in the regions of the MCR nearest the effluent release point (MCR circulation discharge facility). The predictive model shows that the 6OCo concentration will decay to current levels approximately 15 yrs after decommissioning. This situation can be induced earlier if the source term is reduced by implementing a successful cobalt reduction program and/or the liquid waste processing system. At no point during projected plant operations or post operation does 60Co in the MCR system result in a significant dose to the public.

Blankinship, David Randle

1993-01-01T23:59:59.000Z

150

Saving Energy: The Next Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Saving Energy: The Next Generation Saving Energy: The Next Generation Saving Energy: The Next Generation November 28, 2011 - 4:05pm Addthis Sarah Jane Maxted Special Assistant, Office of Energy Efficiency & Renewable Energy Have you heard of America's Home Energy Education Challenge? It's a challenge-designed to get students in grades 3-8 to help their families and communities embrace home energy efficiency. Launched this year by both the Department of Energy and National Science Teachers Association, the Home Energy Challenge is generating a great response-over 390 schools across the United States have registered. View this map to see which schools are participating in your area. The concept behind the contest is simple: participating teachers and students will compete to reduce energy use in their homes. Teams will

151

Building the Next Generation of Automotive Industry Leaders | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building the Next Generation of Automotive Industry Leaders Building the Next Generation of Automotive Industry Leaders Building the Next Generation of Automotive Industry Leaders December 7, 2010 - 4:23pm Addthis Zach Heir , a recent hire in the electric vehicle field Zach Heir , a recent hire in the electric vehicle field Dennis A. Smith Director, National Clean Cities It's no secret that when it comes to advanced vehicle technologies, the Department of Energy is kicking into high gear. We're investing more than $12 billion in grants and loans for research, development and deployment of advanced technology vehicles. These investments are helping to create a clean energy workforce. If we want to continue a leadership role in the global automotive industry, it is crucial that we take the long view and invest heavily in the next generation of innovators and critical thinkers

152

Saving Energy: The Next Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Saving Energy: The Next Generation Saving Energy: The Next Generation Saving Energy: The Next Generation November 28, 2011 - 4:05pm Addthis Sarah Jane Maxted Special Assistant, Office of Energy Efficiency & Renewable Energy Have you heard of America's Home Energy Education Challenge? It's a challenge-designed to get students in grades 3-8 to help their families and communities embrace home energy efficiency. Launched this year by both the Department of Energy and National Science Teachers Association, the Home Energy Challenge is generating a great response-over 390 schools across the United States have registered. View this map to see which schools are participating in your area. The concept behind the contest is simple: participating teachers and students will compete to reduce energy use in their homes. Teams will

153

The Next Generation of Hydropower Engineers and Scientists | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists August 11, 2011 - 12:31pm Addthis Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Mike Reed Water Power Program Manager, Water Power Program As the nation continues to rely on hydropower to help meet its energy needs, a new generation of engineers and scientists is finding ways to make hydropower technologies more efficient, environmentally friendly and cost effective. The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE), in cooperation with the Hydro Research

154

Generation Facility Corporate Tax Exemption | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Facility Corporate Tax Exemption Generation Facility Corporate Tax Exemption Generation Facility Corporate Tax Exemption < Back Eligibility Commercial Industrial Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Montana Program Type Property Tax Incentive Rebate Amount 100% exemption for 5 years Provider Montana Department of Revenue New electricity generating facilities built in Montana with a capacity of up to one megawatt (MW) that use an alternative renewable energy source are exempt from property taxes for five years after operation begins. The taxable value of the property varies depending on the property ownership and class. The assessed value of personal property is adjusted yearly based

155

Exemption from Electric Generation Tax (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exemption from Electric Generation Tax (Connecticut) Exemption from Electric Generation Tax (Connecticut) Exemption from Electric Generation Tax (Connecticut) < Back Eligibility Commercial Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Start Date 07/01/2011 Expiration Date 10/01/2013 State Connecticut Program Type Sales Tax Incentive Rebate Amount 100% exemption Provider Connecticut Department of Revenue Services In 2011, Connecticut created a new tax requiring electric power plants in the state that generate and upload electricity to the regional bulk power grid to pay $2.50 per megawatt hour. Renewable energy facilities and customer-sited facilities are exempt from the tax. The tax and related

156

Electrical Generation Tax Reform Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Tax Reform Act (Montana) Generation Tax Reform Act (Montana) Electrical Generation Tax Reform Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue This Act reforms taxes paid by electricity generators to reduce tax rates and imposes replacement taxes in response to the 1997 restructuring of the

157

A SODIUM-GRAPHITE REACTOR STEAM-ELECTRIC STATION FOR 75 MEGAWATTS NET GENERATION  

SciTech Connect

The major design features, nuclear characteristics and performance data for a nuclear fueled central station power plant of 75,000 kw net capacity are presented. The heat source is a Na cooled graphite moderated reactor. The design of the reactor takes full advantage of the experience gained to date on the Sodium Reactor Experiment (SRE); the plant described here is a straightforward extension of the smaller experimental SRE, which is now under construction. The fuel elements are made up of rod clusters and the moderator is in the form of Zr canned graphite elements. The performance of the reactor has been based on conservative temperatures and coolant flow velocities which result in a plant with "built-in reserve." Thus, as experience is gained and anticipated improvements in reactor fuel elements and construction materials are proven, the performance of the plant can be increased accordingly. Two reactor designs are described, one for operation with slightly enriched U fuel elements and the other for operation with Th--U fuel elements. The associated heat exchangers, pumps, steam, and electrical generating equipment are identical for either reactor design. An analysis of turbine cycles describes the particular cycle chosen for initial operation and discusses a method by which modern central station performance can be initially obtained. The design and performance data which are required to enable reliable estimates of the plant construction and operating costs to be made are established. (auth)

Weisner, E.F.; Sybert, W.M.

1955-03-22T23:59:59.000Z

158

Saving Energy and Money at 24/7 Fire Stations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Saving Energy and Money at 24/7 Fire Stations Saving Energy and Money at 24/7 Fire Stations Saving Energy and Money at 24/7 Fire Stations June 28, 2010 - 11:11am Addthis Coal Creek Fire and Rescue's fire station in New Richmond, Ind. where a new furnace and air conditioner will save energy and money. | Photo courtesy of New Richmond Coal Creek Fire and Rescue's fire station in New Richmond, Ind. where a new furnace and air conditioner will save energy and money. | Photo courtesy of New Richmond What are the key facts? The Indiana Office of Energy Development received $14.1 million in EECBG grants from the American Recovery and Reinvestment Act "The fire station is a building that is in use 24 hours a day, 7 days a week, so naturally it consumes a significant amount of energy," says Molly Whitehead, grants specialist for the Indiana Office of Energy Development.

159

Check Out the New Alternative Fuel Station Locator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Check Out the New Alternative Fuel Station Locator Check Out the New Alternative Fuel Station Locator Check Out the New Alternative Fuel Station Locator November 19, 2012 - 2:29pm Addthis Find Stations Plan a Route Location: Go Start: End: Go Fuel: All Fuels Biodiesel (B20 and above) Compressed Natural Gas Electric Ethanol (E85) Hydrogen Liquefied Natural Gas (LNG) Liquefied Petroleum Gas (Propane) more search options close × More Search Options Include private stations Include planned stations Owner All Private Federal State Local Utility Payment All American Express Discover MasterCard VISA Cash Checks CFN Clean Energy Fuel Man Gas Card PHH Services Voyager WEX Electric charger types Include level 1 Include level 2 Include DC fast Include legacy chargers Limit results to within 5 miles Limit results to within 5 miles

160

Next Generation (NextGen) Geospatial Information System (GIS) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation (NextGen) Geospatial Information System (GIS) Next Generation (NextGen) Geospatial Information System (GIS) Next Generation (NextGen) Geospatial Information System (GIS) July 12, 2013 - 12:17pm Addthis The U.S. Department of Energy Office of Legacy Management (LM) manages environmental records from Cold War legacy sites spanning nearly 40 years. These records are a key LM asset and must be managed and maintained efficiently and effectively. There are over 16 different applications that support the databases containing environmental and geospatial information. The current applications, respective systems, and processes require upgrades to effectively operate in the future. A multi-disciplined LM team collaborated to develop functional requirements and implement NextGen GIS; this system will replace the Geospatial

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Addressing the Sputniks of our Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Addressing the Sputniks of our Generation Addressing the Sputniks of our Generation Addressing the Sputniks of our Generation September 30, 2010 - 5:55pm Addthis Dr. Arun Majumdar Dr. Arun Majumdar Former Director, Advanced Research Projects Agency - Energy Earlier this week, I traveled to Boston to take part in Boston University's Presidential Lecture on Clean Energy and Environmental Sustainability. The purpose of my discussion was to address technology innovations with fierce urgency. To understand what I mean, we must take a quick look back to 1958. In response to the Soviet Union's launch of its first satellite - Sputnik 1, the Department of Defense created DARPA to regain the country's technological lead. Today, we are faced with three similar "Sputnik-like" challenges in the energy sector:

162

The Next Generation of Entrepreneurs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Next Generation of Entrepreneurs The Next Generation of Entrepreneurs The Next Generation of Entrepreneurs July 25, 2011 - 6:15pm Addthis Sarah Jane Maxted Special Assistant, Office of Energy Efficiency & Renewable Energy How can I participate? Students can apply or get more information on FedConnect (link to right in story) by looking up the reference number "DE-FOA-0000570." Applications are due on August 22, 2011. Entrepreneurs. Venture Capitalists. Clean energy. Competitions and funds. Separately, these words only say so much, but together they describe the Energy Department's efforts to support the best and brightest clean energy entrepreneurs as they work to push emerging, innovative clean energy technologies into the marketplace. Now, let's add two words -- universities and students. Throw that into the mix, and the result?

163

A potential transmitter architecture for future generation green wireless base station  

Science Conference Proceedings (OSTI)

Current radio frequency power amplifiers in 3G base stations have very high power consumption leading to a hefty cost and negative environmental impact. In this paper, we propose a potential architecture design for future wireless base station. Issues ...

Vandana Bassoo; Kevin Tom; A. K. Mustafa; Ellie Cijvat; Henrik Sjoland; Mike Faulkner

2009-02-01T23:59:59.000Z

164

MELCOR Analysis of Steam Generator Tube Creep Rupture in Station Blackout Severe Accident  

SciTech Connect

A pressurized water reactor steam generator tube rupture (SGTR) is of concern because it represents a bypass of the containment for radioactive materials to the environment. In a station blackout accident, tube integrity could be threatened by creep rupture, particularly if cracks are present in the tube walls. Methods are developed herein to improve assessment capabilities for SGTR by using the severe-accident code MELCOR. Best-estimate assumptions based on recent research and computational fluid dynamics calculations are applied in the MELCOR analysis to simulate two-dimensional natural circulation and to determine the relative creep-rupture timing in the reactor coolant pressure boundary components. A new method is developed to estimate the steam generator (SG) hottest tube wall temperature and the tube critical crack size for the SG tubes to fail first. The critical crack size for SG tubes to fail first is estimated to be 20% of the wall thickness larger than by a previous analysis. Sensitivity studies show that the failure sequence would change if some assumptions are modified. In particular, the uncertainty in the countercurrent flow limit model could reverse the failure sequence of the SG tubes and surge line.

Liao, Y.; Vierow, K. [Purdue University (United States)

2005-12-15T23:59:59.000Z

165

Xcel Energy Wind and Biomass Generation Mandate | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Xcel Energy Wind and Biomass Generation Mandate Xcel Energy Wind and Biomass Generation Mandate < Back Eligibility Investor-Owned Utility Savings Category Bioenergy Wind Buying & Making Electricity Program Info State Minnesota Program Type Renewables Portfolio Standard Provider Minnesota Department of Commerce Minnesota law (Minn. Stat. § 216B.2423) requires Xcel Energy to build or contract for 225 megawatts (MW) of installed wind-energy capacity in the state by December 31, 1998, and to build or contract for an additional 200 MW of installed capacity by December 31, 2002. The same statute also directed the Minnesota Public Utilities Commission (PUC) to require Xcel Energy to construct and operate, purchase or contract to purchase an

166

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

re-potomac-river-generating-station-department-energy-case-no-eo-05-01-potomac-electr-1 Download Inspection Report: IG-0682 The Department of Energy's Review of Chemical...

167

THE DEVELOPMENT OF HYDROELECTRIC POWER In the early 1880s the first central power-generating station  

E-Print Network (OSTI)

fostered the growth of power companies interested in potential profits. Earlier advances in dam materialsTHE DEVELOPMENT OF HYDROELECTRIC POWER In the early 1880s the first central power-generating station opened in New York City, and a plant in Appleton, Wisconsin, first utilized falling water

US Army Corps of Engineers

168

Department of Energy Response to Correspondence from Mary Celeste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission Docket No. EO-05-01 regarding operation of Mirnat Corporation's Potomac River Generating Station. Department of Energy Response to Correspondence from Mary Celeste...

169

Comments on Department of Energy's Emergency Order To Resume...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Comments on Department of...

170

Response from PJM Interconnection LLC and Pepco to Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

171

Structural integrity analysis of the degraded drywell containment at the Oyster Creek Nuclear generating station.  

SciTech Connect

This study examines the effects of the degradation experienced in the steel drywell containment at the Oyster Creek Nuclear Generating Station. Specifically, the structural integrity of the containment shell is examined in terms of the stress limits using the ASME Boiler and Pressure Vessel (B&PV) Code, Section III, Division I, Subsection NE, and examined in terms of buckling (stability) using the ASME B&PV Code Case N-284. Degradation of the steel containment shell (drywell) at Oyster Creek was first observed during an outage in the mid-1980s. Subsequent inspections discovered reductions in the shell thickness due to corrosion throughout the containment. Specifically, significant corrosion occurred in the sandbed region of the lower sphere. Since the presence of the wet sand provided an environment which supported corrosion, a series of analyses were conducted by GE Nuclear Energy in the early 1990s. These analyses examined the effects of the degradation on the structural integrity. The current study adopts many of the same assumptions and data used in the previous GE study. However, the additional computational recourses available today enable the construction of a larger and more sophisticated structural model.

Petti, Jason P.

2007-01-01T23:59:59.000Z

172

NREL: Department of Defense Energy Programs - U.S. Marine Corps Air Station  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Marine Corps Air Station Miramar U.S. Marine Corps Air Station Miramar NREL performed an assessment at the U.S. Marine Corps Air Station Miramar in California, which established baseline energy use and identified the lowest-cost combination of renewable energy options to meet energy reduction goals. As a result, Miramar is on track to achieve a 43% reduction in building source energy use by 2012 and has been designated the first green Marine Corps base. New projects will enable the base to reduce building source energy use 90% by 2017. Based on the Miramar project, NREL created a standardized assessment and planning process template for other military installations. Widespread replication of this process is planned, with assessments under way at several DOD installations, including: the U.S. Air Force Academy in

173

U. S. DEPARTMENT OF ENERGY REQUEST AND AUTHORIZATION FOR OFFICIAL TRAVEL (Change of Station)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUEST AND AUTHORIZATION FOR OFFICIAL TRAVEL (Change of Station) REQUEST AND AUTHORIZATION FOR OFFICIAL TRAVEL (Change of Station) (Do Not Remove Carbons) DOE F 1510.9 (07-93) (Previously CR-279A) (07-89 edition may be used) 1. Amendment 2. Division/Office Code 3. (Leave Blank) Authorization Number 4. Employee's Name (First name, middle initial and last name) 5. Spouse Plans To: 6. No. of Dependents Age 12 and Over Traveling with Employee (excluding spouse) 7. No. of Dependents Under 12 Traveling with Employee 8. No. of Dependents Age 12 and Over Traveling Separately (excluding spouse) 9. No. of Dependents Under 12 Traveling Separately 10. Estimate in Whole Dollars (For Administrative Services Use) 11. Present Duty Station i. Total Items e. thru h. 12. Date 1 - Yr. Agreement

174

Environmental design guidelines for a second generation, LEO, permanently manned space station  

E-Print Network (OSTI)

This thesis is a continuation of the thoughts and efforts of the author's participation and co-organization of the Space Station Design Workshop (SSDW). The SSDW was a student run event whose inception surfaced in the ...

Johnson, David Michael, 1960-

1987-01-01T23:59:59.000Z

175

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION  

DOE Green Energy (OSTI)

During the period January 1, 2001-March 31, 2001, Allegheny Energy Supply Co., LLC (Allegheny) finalized the engineering of the Willow Island cofiring project, completed the fuel characterizations for both the Willow Island and Albright Generating Station projects, and initiated construction of both projects. Allegheny and its contractor, Foster Wheeler, selected appropriate fuel blends and issued purchase orders for all processing and mechanical equipment to be installed at both sites. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The third quarter of the project involved completing the detailed designs for the Willow Island Designer Fuel project. It also included complete characterization of the coal and biomass fuels being burned, focusing upon the following characteristics: proximate and ultimate analysis; higher heating value; carbon 13 nuclear magnetic resonance testing for aromaticity, number of aromatic carbons per cluster, and the structural characteristics of oxygen in the fuel; drop tube reactor testing for high temperature devolatilization kinetics and generation of fuel chars; thermogravimetric analyses (TGA) for char oxidation kinetics; and related testing. The construction at both sites commenced during this quarter, and was largely completed at the Albright Generating Station site.

K. Payette; D. Tillman

2001-04-01T23:59:59.000Z

176

Latent Impingement Mortality Assessment of the Geiger Multi-DiscTM Screening System at the Potomac River Generating Station  

Science Conference Proceedings (OSTI)

This report presents the results of a field study evaluating the injury and survival of fish exposed to a Geiger Multi-Disc (Geiger) modified traveling water screen designed to protect juvenile and adult fish. The study was conducted at the Potomac River Generating Station owned by Mirant Potomac River, LLC. Information in this report provides the first performance database for this technology. Also, for the species tested, the data presented provide a basis on which to estimate the potential biological ...

2007-07-23T23:59:59.000Z

177

EPRI Ergonomics Handbook for the Electric Power Industry: Ergonomic Design Handbook for Fossil-Fueled Electric Generating Stations  

Science Conference Proceedings (OSTI)

The EPRI Occupational Health and Safety (OHS) Research Program has provided ergonomic information to the electric energy industry workforce since 1999. This is the fifth EPRI ergonomics handbook; it provides a framework and specific guidelines for decisionmaking that will apply ergonomic principles to the design of electric generating stations. Fossil-fueled power plant operation and maintenance is physically strenuous, and it may contribute to development of musculoskeletal disorders (MSDs) such as carp...

2008-03-11T23:59:59.000Z

178

Emergency Diesel Generator reliability at Department of Energy (DOE) facilities  

Science Conference Proceedings (OSTI)

This report is the culmination of the first phase of a comprehensive effort by the Department of Energy (DOE) Defense Programs (DP) Office of Self-Assessment and Emergency Management (DP-9) to assess the reliability and availability of emergency power supplies (i.e., standby or backup supplies providing electric power to systems or equipment that perform functions important to safety) at DOE management concerns over the recent number of reported failures of emergency and back-up supplies to provide power when required. Augmented Evaluation Team (AET) on-site reviews were conducted during the week of September 30, 1991 at Rocky Flats (RF), and the week of October 7, 1991 at the Richland (RL) and Savannah River (SR) sites to investigate the failures. The AET reviews focused on Emergency Diesel Generator (EDG) failures because they were identified as the dominant contributor to power supply failures (46 of the 77 failures involved EDGs, as opposed to other sources such as batteries, motor-generator sets, etc.). The RF, RL, and SR sites were chosen because they were among the leaders in numbers of EDG failures. The objectives of the AET investigations were to collect, analyze, and document factual information concerning the causes, conditions, and circumstances surrounding EDG failures, to conduct a preliminary assessment of the safety significance of the failures and the site specific and generic safety implications for DOE facilities, and to identify appropriate follow-on actions necessary to complete the overall assessment of the adequacy of emergency and back-up power sources. This report presents the AET findings concerning the reliability of EDGs at the RF, RL, and SR sites, and the safety significance of EDG failures.

Not Available

1992-04-01T23:59:59.000Z

179

DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION  

DOE Green Energy (OSTI)

During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker.

K. Payette; D. Tillman

2001-01-01T23:59:59.000Z

180

Recommended practice for fire protection for electric generating plants and high voltage direct current converter stations. 2005 ed.  

Science Conference Proceedings (OSTI)

The standard outlines fire safety recommendations for gas, oil, coal, and alternative fuel electric generating plants including high voltage direct current converter stations and combustion turbine units greater than 7500 hp used for electric generation. Provisions apply to both new and existing plants. The document provides fire prevention and fire protection recommendations for the: safety of construction and operating personnel; physical integrity of plant components; and continuity of plant operations. The 2005 edition includes revisions and new art that clarify existing provisions. 5 annexes.

NONE

2005-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Noise impact evaluation of a power generating station and a refuse?derived fuel facility  

Science Conference Proceedings (OSTI)

Community noiseimpact assessment of a planned addition of refuse?derived fuel (RDF) facility adjacent to a fossil?fueled power plant was conducted using a computerized atmospheric sound propagation model. Close?in measurements of power plant operation and coal handling system were used for station input

V. M. Lee; W. L. Knoll

1979-01-01T23:59:59.000Z

182

Department of Energy to Invest More than $21 Million for Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy to Invest More than $21 Million for Next Department of Energy to Invest More than $21 Million for Next Generation Solar Energy Projects Department of Energy to Invest More than $21 Million for Next Generation Solar Energy Projects November 8, 2007 - 4:31pm Addthis 25 Cutting Edge Projects Target Enhanced Solar Energy Efficiency WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced that the Department will invest $21.7 million in next generation photovoltaic (PV) technology to help accelerate the widespread use of advanced solar power. The 25 projects that DOE selected as part of this Funding Opportunity Announcement, Next Generation Photovoltaic Devices & Processes, are an integral part of the President's Solar America Initiative, which aims to make solar energy cost-competitive with

183

Department of Energy Order No. 202-05-03 Revised Notice of Planned...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Planned Outages During January 2006 More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power...

184

Department of Energy Order No. 202-05-03 Notice of Planned Outages...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Outages, in Sequence During January 2006 More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power...

185

Draft Report Chapter 2: Generation Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 2: Generation Adequacy More Documents & Publications Draft Report: Chapter 2 Generation Adequacy. Keeping The Lights On In the New World Electricity Advisory Committee...

186

EA-345 New Brunswick Power Generation Corporation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home EA-345 New Brunswick Power Generation Corporation EA-345 New Brunswick Power Generation Corporation Order...

187

EA-290-A Ontario Power Generation, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home EA-290-A Ontario Power Generation, Inc. EA-290-A Ontario Power Generation, Inc. Order authorizing Ontario...

188

EA-290 Ontario Power Generation, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home EA-290 Ontario Power Generation, Inc. EA-290 Ontario Power Generation, Inc. Order authorizing Ontario...

189

EA-290-B Ontario Power Generation, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home EA-290-B Ontario Power Generation, Inc. EA-290-B Ontario Power Generation, Inc. Order authorizing Ontario...

190

Renewable Energy Generation Zone Property Tax Abatement | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Zone Property Tax Abatement Renewable Energy Generation Zone Property Tax Abatement Eligibility Commercial Industrial Savings For Bioenergy Biofuels Alternative Fuel...

191

Department of Energy Awards $300,000 to Albuquerque’s Next Generation Economy Community Reuse Organization  

Energy.gov (U.S. Department of Energy (DOE))

Department of Energy Awards $300,000 to Albuquerque’s Next Generation Economy Community Reuse Organization

192

Effect of Hurricane Andrew on the Turkey Point Nuclear Generating Station from August 20--30, 1992. [Final report  

SciTech Connect

On August 24, 1992, Hurricane Andrew, a Category 4 hurricane, struck the Turkey Point Electrical Generating Station with sustained winds of 145 mph (233 km/h). This is the report of the team that the US Nuclear Regulatory Commission (NRC) and the Institute of Nuclear Power Operations (INPO) jointly sponsored (1) to review the damage that the hurricane caused the nuclear units and the utility`s actions to prepare for the storm and recover from it, and (2) to compile lessons that might benefit other nuclear reactor facilities.

Hebdon, F.J. [Institute of Nuclear Power Operations, Atlanta, GA (United States)

1993-03-01T23:59:59.000Z

193

EPRI Ergonomics Handbook for the Electric Power Industry: Ergonomic Interventions for Plant Operators and Mechanics in Fossil-Fueled Generating Stations  

Science Conference Proceedings (OSTI)

The EPRI Occupational Health and Safety (OHS) Committee Research Program has provided ergonomic information to the electric energy industry workforce since 1999. This is the sixth EPRI ergonomics handbook; it specifically focuses on tasks performed by plant operators and mechanics working in fossil-fueled generating stations and also addresses some tasks performed by steam services technicians. Fossil-fueled generating station operational and mechanical work is physically strenuous and can expose workers...

2008-12-15T23:59:59.000Z

194

Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Workshop  

Science Conference Proceedings (OSTI)

Pacific Northwest Laboratory (PNL) evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume II, reports the results of an industry-wide workshop held on May 28 and 29, 1986, to discuss the technical issues associated with aging of nuclear service emergency diesel generators. The technical issues discussed most extensively were: man/machine interfaces, component interfaces, thermal gradients of startup and cooldown and the need for an accurate industry database for trend analysis of the diesel generator system.

Hoopingarner, K.R.; Vause, J.W.

1987-08-01T23:59:59.000Z

195

Nuclear Power Generating Facilities (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power Generating Facilities (Maine) Nuclear Power Generating Facilities (Maine) Nuclear Power Generating Facilities (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Radiation Control Program The first subchapter of the statute concerning Nuclear Power Generating Facilities provides for direct citizen participation in the decision to construct any nuclear power generating facility in Maine. The Legislature

196

Embedded Generation (New Brunswick, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Embedded Generation (New Brunswick, Canada) Embedded Generation (New Brunswick, Canada) Embedded Generation (New Brunswick, Canada) < Back Eligibility Agricultural Commercial Developer Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Rural Electric Cooperative Schools Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Performance-Based Incentive Provider NB Power NB Power has seen an increase in the amount of companies and individuals who are interested in generating electricity using an environmentally sustainable energy source. As a result, NB Power has implemented an Embedded Generation program which complements their existing net metering

197

Water-related constraints to the development of geothermal electric generating stations  

DOE Green Energy (OSTI)

The water-related constraints, which may be among the most complex and variable of the issues facing commercialization of geothermal energy, are discussed under three headings: (1) water requirements of geothermal power stations, (2) resource characteristics of the most promising hydrothermal areas and regional and local water supply situations, and (3) legal issues confronting potential users of water at geothermal power plants in the states in which the resource areas are located. A total of 25 geothermal resource areas in California, New Mexico, Oregon, Idaho, Utah, Hawaii, and Alaska were studied. Each had a hydrothermal resource temperature in excess of 150/sup 0/C (300/sup 0/F) and an estimated 30-year potential of greater than 100-MW(e) capacity.

Robertson, R.C.; Shepherd, A.D.; Rosemarin, C.S.; Mayfield, M.W.

1981-06-01T23:59:59.000Z

198

Tax Exemption for Wind Energy Generation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tax Exemption for Wind Energy Generation Tax Exemption for Wind Energy Generation Tax Exemption for Wind Energy Generation < Back Eligibility Utility Savings Category Wind Buying & Making Electricity Program Info Start Date 7/2001 State West Virginia Program Type Corporate Exemption Rebate Amount Reduction of Business and Occupations (BandO) tax from 40% to 12% of generating capacity Provider West Virginia Division of Energy In March 2007, West Virginia enacted legislation ([http://www.legis.state.wv.us/Bill_Text_HTML/2007_SESSIONS/RS/BILLS/sb441... SB 441]) amending its tax law concerning the business and operation (B&O) tax for wind turbines. Although SB 441 increased the taxable value of wind turbine generating capacity, the taxation level is still significantly lower than that of most other types of electricity generation. For most

199

Next Generation of Government Summit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation of Government Summit Next Generation of Government Summit Next Generation of Government Summit July 25, 2013 9:15AM EDT to July 26, 2013 5:15PM EDT Washington DC GovLoop and Young Government Leaders will hold its 4th Annual Next Generation of Government Summit from July 25 to July 26, 2013, in Washington, DC. The theme for the conference is 2013 Next Generation of Government Training Summit: Developing the 21st Century Government Leader. Next Generation of Government Summit qualifies as training in compliance with 5 U.S.C. chapter 41. The training is open to all Federal employees and will provide training and workshops in such areas as Project Management, Innovation, Analytics and Decision-Making, and Career Development. Before participating, Federal employees and managers should review

200

D.McNew/GettyIMaGes San Onofre Nuclear Generating Station, California.  

E-Print Network (OSTI)

. But as US demand increases for gas in heating,cookingandtransportation,itspricewillrise.Natural--arelativelylow-carbon-emissionfossilfuel--hasbeen thepreferredfuelfornewelectricalcapacityoverthepasttwodecades. Resourcediscoveriesandadvancesinextractiontechnologieshavemade natural gas seem inexpensive-fuellednuclear)2 .Smartpolicywould be to reduce the use of natural gas in electricity generation. Although

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study  

Science Conference Proceedings (OSTI)

Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators.

Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

1987-08-01T23:59:59.000Z

202

Nuclear Maintenance Applications Center: Clearance and Tagging Guideline for Nuclear Electric Generating Stations, Revision 1  

Science Conference Proceedings (OSTI)

Clearance and tagging programs at nuclear electric generating facilities serve to protect personnel from injury and to protect equipment from damage. These programs are thus of vital importance from both a worker safety standpoint and an operations and maintenance cost standpoint. This guideline presents a clearance and tagging approach, developed with broad industry input, that nuclear electric generating companies can use as a basis for comparison with their own programs.

2010-02-01T23:59:59.000Z

203

Fueling the Next Generation of Vehicle Technology | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Fuel Cell Research Center, points out the tri-generation facility that uses biogas from Orange County Sanitation Districts wastewater treatment plant to produce...

204

PP-206 Frontera Generation Limited Partnership | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partnership to construct, operate, and maintain electric transmission facilities at the U.S-Mexican border. PP-206 Frontera Generation Limited Partnership More Documents &...

205

Interconnection Standards for Small Generators | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards for Small Generators Interconnection Standards for Small Generators Interconnection Standards for Small Generators < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities

206

Energy Department Announces $45 Million to Advance Next-Generation Vehicle  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$45 Million to Advance Next-Generation $45 Million to Advance Next-Generation Vehicle Technologies Energy Department Announces $45 Million to Advance Next-Generation Vehicle Technologies September 4, 2013 - 12:00pm Addthis Energy Department Announces $45 Million to Advance Next-Generation Vehicle Technologies Thirty-eight projects will accelerate the research and development of technologies to improve vehicle fuel efficiency, lower transportation costs, and cut carbon pollution. Energy Department Announces $45 Million to Advance Next-Generation Vehicle Technologies Thirty-eight projects will accelerate the research and development of technologies to improve vehicle fuel efficiency, lower transportation costs, and cut carbon pollution. Building on President Obama's Climate Action Plan to build a 21st century

207

Using Backup Generators: Alternative Backup Power Options | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Backup Power Options Alternative Backup Power Options Using Backup Generators: Alternative Backup Power Options Using Backup Generators: Alternative Backup Power Options In addition to electric generators powered by fuel, homeowners and business owners may consider alternative backup power options. Battery-stored backup power-Allows you to continue operating lights, refrigerators and other appliances, fans, and communications during a power outage. These systems can connect to renewable sources of energy, like solar panels and small-scale wind generators, to help the batteries stay charged during an emergency. You can also recharge many of these battery systems with diesel generators. The length of time you will be able to draw electricity from your batteries will depend on the size of your

208

Mesh Generation for SHARP: Unprecedented Complexity | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mesh Generation for SHARP: Unprecedented Complexity Mesh Generation for SHARP: Unprecedented Complexity Mesh Generation for SHARP: Unprecedented Complexity January 29, 2013 - 1:36pm Addthis SHARP Supporting Elements During this quarter, the framework team was involved in two primary efforts, mesh generation and implementation of a MOAB-based coupled multi-physics simulation. For mesh generation, finishing touches were put on three major, high-complexity hexahedral meshes, and support was provided for their use in various simulations: MATiS-H, an OECD-NEA experiment for single-phase flow over a rod bundle and grid. [ANL] Nuscale, a hexahedral mesh of the core internals of the Multi-Application Small Light Water Reactor, a 1/3-scale mockup of the Nuscale reactor. [ANL] XX09, a high-fidelity model of the XX09 test fuel assembly used in

209

Energy Generation Project Permitting (Vermont) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Project Permitting (Vermont) Generation Project Permitting (Vermont) Energy Generation Project Permitting (Vermont) < Back Eligibility Construction Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Environmental Regulations Provider Agency of Natural Resources The Vermont Energy Generation Siting Policy Commission is mandated to survey best practices for siting approval of electric generation projects (all facilities except for net- and group-net-metered facilities) and for public participation and representation in the siting process, and to report to the Governor and to the Vermont Legislature on their findings by

210

Graphene, Hydrogen and Next-Generation Electronics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Graphene, Hydrogen and Next-Generation Electronics Graphene, Hydrogen and Next-Generation Electronics Graphene, Hydrogen and Next-Generation Electronics July 22, 2011 - 5:32pm Addthis Graphene grains in several different shapes, controlled by hydrogen. | Courtesy of Oak Ridge National Laboratory Graphene grains in several different shapes, controlled by hydrogen. | Courtesy of Oak Ridge National Laboratory A team of Oak Ridge National Laboratory (ORNL) and New Mexico State University researchers have developed a new approach to growing graphene (one-atom thick carbon sheets) that can help advance next-generation electronics including batteries, transistors and computer chips. Growing graphene usually involves a process called chemical vapor deposition method that produces irregularly shaped grains. Little was known

211

Utility Generation and Clean Coal Technology (Indiana) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Generation and Clean Coal Technology (Indiana) Utility Generation and Clean Coal Technology (Indiana) Utility Generation and Clean Coal Technology (Indiana) < Back Eligibility Commercial Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Corporate Tax Incentive Industry Recruitment/Support Performance-Based Incentive Rebate Program Grant Program Provider Indiana Utility Regulatory Commission This statute establishes the state's support and incentives for the development of new energy production and generating facilities implementing advanced clean coal technology, such as coal gasification. The statute also supports the development of projects using renewable energy sources as well

212

Sales Tax Exemption for Hydrogen Generation Facilities | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tax Exemption for Hydrogen Generation Facilities Tax Exemption for Hydrogen Generation Facilities Sales Tax Exemption for Hydrogen Generation Facilities < Back Eligibility Commercial Industrial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State North Dakota Program Type Sales Tax Incentive Rebate Amount 100% Provider Office of the State Tax Commissioner In North Dakota, the sale of hydrogen used to power an internal combustion engine or a fuel cell is exempt from sales tax. In addition, any equipment used by a hydrogen generation facility for the production and storage of hydrogen is exemption from sales tax. Stationary and portable hydrogen containers or pressure vessels, piping, tubing, fittings, gaskets, controls, valves, gauges, pressure regulators, safety relief devices are

213

Graphene, Hydrogen and Next-Generation Electronics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Graphene, Hydrogen and Next-Generation Electronics Graphene, Hydrogen and Next-Generation Electronics Graphene, Hydrogen and Next-Generation Electronics July 22, 2011 - 5:32pm Addthis Graphene grains in several different shapes, controlled by hydrogen. | Courtesy of Oak Ridge National Laboratory Graphene grains in several different shapes, controlled by hydrogen. | Courtesy of Oak Ridge National Laboratory A team of Oak Ridge National Laboratory (ORNL) and New Mexico State University researchers have developed a new approach to growing graphene (one-atom thick carbon sheets) that can help advance next-generation electronics including batteries, transistors and computer chips. Growing graphene usually involves a process called chemical vapor deposition method that produces irregularly shaped grains. Little was known

214

Department of Energy to Invest More than $21 Million for Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More than $21 Million for Next More than $21 Million for Next Generation Solar Energy Projects Department of Energy to Invest More than $21 Million for Next Generation Solar Energy Projects November 8, 2007 - 4:31pm Addthis 25 Cutting Edge Projects Target Enhanced Solar Energy Efficiency WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced that the Department will invest $21.7 million in next generation photovoltaic (PV) technology to help accelerate the widespread use of advanced solar power. The 25 projects that DOE selected as part of this Funding Opportunity Announcement, Next Generation Photovoltaic Devices & Processes, are an integral part of the President's Solar America Initiative, which aims to make solar energy cost-competitive with

215

Demonstration Development Project: Solar Augmentation at the Coal-Fired Cameo Generating Station  

Science Conference Proceedings (OSTI)

Concentrating solar power (CSP) systems use solar thermal energy for the generation of electric power. This attribute makes it relatively easy to integrate CSP systems into fossil-fueled power plants. Solar augmentation of fossil power plants offers a lower cost and lower risk alternative to stand-alone solar plant construction. In addition, such applications present a promising opportunity to meet renewable energy targets, reduce fossil emissions, accelerate utility-scale solar deployment, and speed the...

2011-09-23T23:59:59.000Z

216

US EPA Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites October 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

R-08/023 R-08/023 October 2007 Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites By: Gail Mosey, Donna Heimiller, Douglas Dahle, Laura Vimmerstedt, and Liz Brady-Sabeff National Renewable Energy Laboratory 1617 Cole Blvd. Golden, CO 80401 Under Contract No. DE-AC36-99-GO10337 Through EPA IAG NO. DW89930254010 NREL/TP-640-41522 For: George Huffman, EPA Project Manager Sustainable Technology Division National Risk Management Research Laboratory U.S. Environmental Protection Agency Cincinnati, Ohio 45268 National Risk Management Research Laboratory Office of Research and Development U.S. Environmental Protection Agency Cincinnati, Ohio 45268 Notice The U.S. Environmental Protection Agency through its Office of Research and Development

217

Seismic structural fragility investigation for the San Onofre Nuclear Generating Station, Unit 1 (Project I); SONGS-1 AFWS Project  

Science Conference Proceedings (OSTI)

An evaluation of the seismic capacities of several of the San Onofre Nuclear Generating Station, Unit 1 (SONGS-1) structures was conducted to determine input to the overall probabilistic methodology developed by Lawrence Livermore National Laboratory. Seismic structural fragilities to be used as input consist of median seismic capacities and their variabilities due to randomness and uncertainty. Potential failure modes were identified for each of the SONGS-1 structures included in this study by establishing the seismic load-paths and comparing expected load distributions to available capacities for the elements of each load-path. Particular attention was given to possible weak links and details. The more likely failure modes were screened for more detailed investigation.

Wesley, D.A.; Hashimoto, P.S.

1982-04-01T23:59:59.000Z

218

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

re-potomac-river-generating-station-department-energy-case-no-eo-05-01-potomac-electr-0 Download Fehner and Gosling, Origins of the Nevada Test Site Terrence R. Fehner and...

219

Training the Next Generation of Nuclear Energy Leaders | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training the Next Generation of Nuclear Energy Leaders Training the Next Generation of Nuclear Energy Leaders Training the Next Generation of Nuclear Energy Leaders May 8, 2012 - 3:06pm Addthis University of Idaho professor Supathorn Phongikaroon works with a graduate student in the radiochemistry lab at the Center for Advanced Energy Studies in Idaho Falls, Idaho. Phongikaroon has received $820,000 from DOE to study an applied technology to remotely analyze spent nuclear fuel. | Photo courtesy of the University of Idaho. University of Idaho professor Supathorn Phongikaroon works with a graduate student in the radiochemistry lab at the Center for Advanced Energy Studies in Idaho Falls, Idaho. Phongikaroon has received $820,000 from DOE to study an applied technology to remotely analyze spent nuclear fuel. | Photo

220

Educating a New Generation of Energy Influencers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Educating a New Generation of Energy Influencers Educating a New Generation of Energy Influencers Educating a New Generation of Energy Influencers October 5, 2010 - 9:59am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy OK. Sometimes I just want to feel like a kid again. Is that so wrong? I occasionally indulge the child in me: eat a grilled cheese sandwich and tater tots, race down the street at breakneck speed on my bike for no apparent reason, and call my mom for some sympathy when I get a cold. Another thing that takes me back to my childhood is playing video games. Something I discovered recently as I was browsing the Office of Energy Efficiency and Renewable Energy's Web site is this great resource for kids called Kids Saving Energy. The first thing I did when I got on the site was

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The Next Generation of Scientists | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Next Generation of Scientists The Next Generation of Scientists The Next Generation of Scientists August 5, 2010 - 11:23am Addthis Director Brinkman Director Brinkman Director of the Office of Science The DOE Office of Science Graduate Fellowship program, a $22.7 million program to support outstanding students pursing graduate training in the sciences, received an infusion of $12.5 million from the American Recovery and Reinvestment Act. As a result, 150 graduate students will receive a three-year graduate fellowship, which includes tuition, living expenses, and research support. The Graduate Fellowship program reflects the Office of Science's strong commitment to our nation and complements the President's mission to support math and science education, especially in areas of national need

222

Celebrating The Next Generation of Energy Entrepreneurs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Celebrating The Next Generation of Energy Entrepreneurs Celebrating The Next Generation of Energy Entrepreneurs Celebrating The Next Generation of Energy Entrepreneurs April 30, 2013 - 5:03pm Addthis Acting Energy Secretary Poneman (far left) stand with a team of young entrepreneurs from Brigham Young University -- the regional winners of the National Clean Energy Business Plan Competition. | Photo by Ilya Pupko, ILAsoft.net. Acting Energy Secretary Poneman (far left) stand with a team of young entrepreneurs from Brigham Young University -- the regional winners of the National Clean Energy Business Plan Competition. | Photo by Ilya Pupko, ILAsoft.net. Sean Sullivan Speechwriter, Office of Public Affairs. WANT MORE? Watch this video recap of the 2012 National Clean Energy Business Plan Competition finale. What makes America the world's leader in innovation and entrepreneurship?

223

Educating a New Generation of Energy Influencers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Educating a New Generation of Energy Influencers Educating a New Generation of Energy Influencers Educating a New Generation of Energy Influencers October 5, 2010 - 9:59am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy OK. Sometimes I just want to feel like a kid again. Is that so wrong? I occasionally indulge the child in me: eat a grilled cheese sandwich and tater tots, race down the street at breakneck speed on my bike for no apparent reason, and call my mom for some sympathy when I get a cold. Another thing that takes me back to my childhood is playing video games. Something I discovered recently as I was browsing the Office of Energy Efficiency and Renewable Energy's Web site is this great resource for kids called Kids Saving Energy. The first thing I did when I got on the site was

224

Simulating the Next Generation of Energy Technologies | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simulating the Next Generation of Energy Technologies Simulating the Next Generation of Energy Technologies Simulating the Next Generation of Energy Technologies September 22, 2010 - 6:40pm Addthis Former Under Secretary Koonin Former Under Secretary Koonin Director - NYU's Center for Urban Science & Progress and Former Under Secretary for Science When aerospace engineers design a new aircraft, they don't start with a prototype, they start with a computer. Computer simulations have revolutionized that industry, allowing engineers to make complex calculations and fine tune designs well before the first physical model is ever produced. All of this amounts to a production process that costs less and produces a commercial product much faster. It's an approach that has changed the way the aerospace industry operates, and it's one that we

225

Self-Generation Incentive Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Generation Incentive Program Self-Generation Incentive Program Self-Generation Incentive Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Maximum Rebate $5 million, or 60% of eligible project costs, whichever is less. Incentive payment is capped at 3 MW. Program Info Start Date 2001 Expiration Date 1/1/2016 State California Program Type State Rebate Program Rebate Amount For projects 30 kW or larger, 50% of incentive will be received up-front; 50% will be received based on actual kWh production over the first 5 years. For projects under 30kW, 100% of the incentive will be paid up front.

226

Fostering a New Generation of Geothermal Workers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fostering a New Generation of Geothermal Workers Fostering a New Generation of Geothermal Workers Fostering a New Generation of Geothermal Workers October 5, 2010 - 4:31pm Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Editor's Note: The Registration Deadline has been extended to November 12th. If there's one thing that absolutely must be in place to build a robust clean energy economy, it's a robust and well-trained clean energy workforce. Think about it - we're doing something here that we've never really done before, at least not to this scale. It's one thing to install solar panels on top of large building complexes and in huge fields - but how about every home in America? And if we're really going to use electric vehicles to the scale that David Sandalow talked about yesterday,

227

Creating the Next Generation of Energy Efficient Technology | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Creating the Next Generation of Energy Efficient Technology Creating the Next Generation of Energy Efficient Technology Creating the Next Generation of Energy Efficient Technology Supporting Innovative Research to Help Reduce Energy Use and Advance Manufacturing Supporting Innovative Research to Help Reduce Energy Use and Advance Manufacturing The Emerging Technologies team partners with national laboratories, industry, and universities to advance research, development, and commercialization of energy efficient and cost effective building technologies. These partnerships help foster American ingenuity to develop cutting-edge technologies that have less than 5 years to market readiness, and contribute to the goal to reduce energy consumption by at least 50%. Research and Development Improve the energy efficiency of appliances, including

228

Simulating the Next Generation of Energy Technologies | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simulating the Next Generation of Energy Technologies Simulating the Next Generation of Energy Technologies Simulating the Next Generation of Energy Technologies September 22, 2010 - 6:40pm Addthis Former Under Secretary Koonin Former Under Secretary Koonin Director - NYU's Center for Urban Science & Progress and Former Under Secretary for Science When aerospace engineers design a new aircraft, they don't start with a prototype, they start with a computer. Computer simulations have revolutionized that industry, allowing engineers to make complex calculations and fine tune designs well before the first physical model is ever produced. All of this amounts to a production process that costs less and produces a commercial product much faster. It's an approach that has changed the way the aerospace industry operates, and it's one that we

229

Training the Next Generation of Nuclear Energy Leaders | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Next Generation of Nuclear Energy Leaders the Next Generation of Nuclear Energy Leaders Training the Next Generation of Nuclear Energy Leaders May 8, 2012 - 3:06pm Addthis University of Idaho professor Supathorn Phongikaroon works with a graduate student in the radiochemistry lab at the Center for Advanced Energy Studies in Idaho Falls, Idaho. Phongikaroon has received $820,000 from DOE to study an applied technology to remotely analyze spent nuclear fuel. | Photo courtesy of the University of Idaho. University of Idaho professor Supathorn Phongikaroon works with a graduate student in the radiochemistry lab at the Center for Advanced Energy Studies in Idaho Falls, Idaho. Phongikaroon has received $820,000 from DOE to study an applied technology to remotely analyze spent nuclear fuel. | Photo

230

Solar Power Generates Big Savings in Salinas, California | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generates Big Savings in Salinas, California Power Generates Big Savings in Salinas, California Solar Power Generates Big Savings in Salinas, California October 15, 2012 - 4:40pm Addthis A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County’s Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs. Click here to see a panoramic view of the entire solar array. | Photo courtesy of Santa Cruz Westside Electric, DBA Sandbar. A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County's Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs.

231

New San Antonio Airport Terminal Generating Clean Power | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Antonio Airport Terminal Generating Clean Power San Antonio Airport Terminal Generating Clean Power New San Antonio Airport Terminal Generating Clean Power January 27, 2011 - 2:03pm Addthis The new photovoltaic system at the San Antonio International Airport. The new photovoltaic system at the San Antonio International Airport. Todd G. Allen Project Officer, Golden Field Office What are the key facts? The City of San Antonio's EECBG proram staff awarded a block grant for a solar photovoltaic (PV) system at the airport, designed and built the project, and complied with all local and federal regulations... all in seven months. In early 2010, the City of San Antonio's Energy Efficiency and Conservation Block Grant (EECBG) program staff quickly realized a golden opportunity lay right at their fingertips. The opening of the new San

232

Solar Power Generates Big Savings in Salinas, California | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Power Generates Big Savings in Salinas, California Solar Power Generates Big Savings in Salinas, California Solar Power Generates Big Savings in Salinas, California October 15, 2012 - 4:40pm Addthis A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County’s Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs. Click here to see a panoramic view of the entire solar array. | Photo courtesy of Santa Cruz Westside Electric, DBA Sandbar. A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County's Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs.

233

Summary of Chariton Valley Switchgrass Co-Fire Testing at the Ottumwa Generating Station in Chillicothe, Iowa: Milestone Completion Report  

DOE Green Energy (OSTI)

Results of the switchgrass co-firing tests conducted at the Ottumwa Generating Station in Chillicothe, Iowa as part of the Chariton Valley Biomass Project. After several years of planning, the Chariton Valley Biomass Project successfully completed two months of switchgrass co-fire testing at the Ottumwa Generating Station (OGS) in Chillicothe, Iowa. From November 30, 2000, through January 25, 2001, the switchgrass team co-fired 1,269 tons (1,151 tonnes) of switchgrass at rates up to 16.8 tons/h (15.2 tonne/h), representing about 3% heat input to the 725-MW power plant. Stack testing was completed when co-firing switchgrass and when burning only coal. Fuel and ash samples were collected for analysis, and boiler performance and emissions data were collected. Numerous improvements were made to the feed-handling equipment during testing. The co-fire testing was completed with no environmental incidents, no injuries to personnel, and no loss in electricity output from OGS. The goals of the this--the first of three rounds of co-fire tests--were: to identify the effects of co-firing on boiler performance, to measure any changes in emissions during co-firing, and to gather information to improve the design of the switchgrass handling equipment. All three of these goals were met. The design target for the switchgrass handling system was 12.5 ton/h (11.3 tonne/h), which we exceeded after a redesign of the secondary grinder in our system. We had hoped to burn over 3,000 tons (2,722 tonnes) of switchgrass during this first round of testing, but because of poor equipment performance in December, we were unable to meet this target before the planned boiler shutdown in January. There were, however, several days in January when we burned more than 100 tons (91 tonnes) of switchgrass.

Amos, W.

2002-07-01T23:59:59.000Z

234

Department of Energy Announces $40 Million to Develop the Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Announces $40 Million to Develop the Next Department of Energy Announces $40 Million to Develop the Next Generation Nuclear Plant Department of Energy Announces $40 Million to Develop the Next Generation Nuclear Plant March 8, 2010 - 12:00am Addthis WASHINGTON, DC - U.S. Secretary of Energy Steven Chu today announced selections for the award of approximately $40 million in total to two teams led by Pittsburgh-based Westinghouse Electric Co. and San Diego-based General Atomics for conceptual design and planning work for the Next Generation Nuclear Plant (NGNP). The results of this work will help the Administration determine whether to proceed with detailed efforts toward construction and demonstration of the NGNP. If successful, the NGNP Demonstration Project will demonstrate high-temperature gas-cooled reactor

235

A New Generation of Labels for a New Generation of Cars | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A New Generation of Labels for a New Generation of Cars A New Generation of Labels for a New Generation of Cars A New Generation of Labels for a New Generation of Cars May 25, 2011 - 5:42pm Addthis A New Generation of Labels for a New Generation of Cars John Schueler John Schueler Former New Media Specialist, Office of Public Affairs What does this mean for me? An improved car buying experience Clear cut cost comparisons of vehicles If you've ever gone through the process of shopping for a new car, you know just how difficult it can be to cut through the hype and find the best vehicle for you. For decades, consumers have been turning to fuel economy labels to get gas mileage estimates for city and highway driving, to narrow their choices and make an informed purchase. Today, there are more vehicle choices than ever and consumers want to know

236

A New Generation of Labels for a New Generation of Cars | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Generation of Labels for a New Generation of Cars New Generation of Labels for a New Generation of Cars A New Generation of Labels for a New Generation of Cars May 25, 2011 - 5:42pm Addthis A New Generation of Labels for a New Generation of Cars John Schueler John Schueler Former New Media Specialist, Office of Public Affairs What does this mean for me? An improved car buying experience Clear cut cost comparisons of vehicles If you've ever gone through the process of shopping for a new car, you know just how difficult it can be to cut through the hype and find the best vehicle for you. For decades, consumers have been turning to fuel economy labels to get gas mileage estimates for city and highway driving, to narrow their choices and make an informed purchase. Today, there are more vehicle choices than ever and consumers want to know

237

2009 Total Energy Production by State | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandy Alternative Fueling Station Locator Alternative Fueling Station Locator Energy Department National Labs and Minority Serving Institutions Energy Department National...

238

Stressing of turbine-generator-exciter shafts by variable-frequency currents superimposed on DC currents in asynchronous HVDC links and following disturbances at converter stations  

SciTech Connect

Ripple currents on the DC side of both HVDC synchronous and asynchronous. Links together with cleared HVDC and AC system disturbances can excite in some circumstances onerous torsional vibrations in large steam generator shafts. The problem has assumed importance in recent months on account of the HVDC Link between Scotland and Northern Ireland going ahead, on account of the proposed Eire/Wales Link, and because AC/DC/AC couplers are to be installed extensively to interconnect the East and West European Grid Systems. This paper discusses and analyses excitation of shaft torsional vibrations in steam turbine-generator-exciter shafts in close proximity to HVDC converter stations by (1) variable-frequency ripple currents superimposed on the DC currents in asynchronous Links, and (2) disturbances at bi-polar converter stations. The time response and tables show that for the systems studied variable-frequency ripple currents superimposed on the DC current in asynchronous Links can excite shaft torsional vibrations, the very small noncharacteristic currents could result in onerous shaft torques which might damage the machine, and that DC line faults at converter stations in close proximity of steam turbine-generator units can excite onerous turbine-generator shaft torsional response. Detailed simulation of the HVDC converter and generator is necessary for precise assessments of shaft torsional response following HVDC converter station faults. 500MW, 660MW, 1000MW and 1300MW machines are considered in the analyses that are made.

Hammons, T.J.; Bremner, J.J. (Univ. of Glasgow (United Kingdom))

1994-09-01T23:59:59.000Z

239

GC GUIDANCE ON ELECTRIC VEHICLE RECHARGING STATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ELECTRIC VEHICLE RECHARGING STATIONS Several National Laboratory contractors have asked us whether Department of Energy ("Department" or "DOE") appropriated funds may be used to...

240

Life Cycle Management Planning at Wolf Creek Generating Station: EDG, Main Steam, and Feedwater Isolation Valves, and Reactor Protec tion System  

Science Conference Proceedings (OSTI)

As the electric power industry becomes more competitive, life cycle management (LCM) of systems, structures, and components (SSCs) becomes very important to keep plants economically viable throughout their remaining licensed operating terms (either 40-year or 60-year terms). This report provides the industry with lessons learned from applying EPRI's LCM planning process to three SSCs at Wolf Creek Generating Station.

2001-12-19T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Reference: Quad Cities Nuclear Power Station- Preconditioning of Emergency Diesel Generator Air Start Systems, Fuel Systems, and other Engine and Electrical  

E-Print Network (OSTI)

The purpose of this letter is twofold. First, to inform the NRC that Quad Cities Nuclear Power Station will not dispute the Non-Cited Violation (50-254/01-05-04; 50-265/01-05-04) of 10 CFR 50 Appendix B, Criterion XI, "Test Control, " described in the referenced NRC report. The station similarly concurs that the risk significance was very low (Green). Senior station management and station personnel understand the importance of scheduling and performing Technical Specifications required surveillances such that unacceptable preconditioning does not occur. The instances identified in the referenced NRC report have been entered into the station's corrective action program and corrective actions have been implemented or are scheduled for implementation. Second, given the importance of this subject and based upon our review of the NRC integrated inspection report, the station is providing an update on several of the issues discussed in section three, "Units 1 and 2 Emergency Diesel Generator Timed Test Preconditioning Concerns. " This is intended to update the NRC and supplement our shared understanding of the issues. The following specific points are provided: August 8, 2001 U.S. Nuclear Regulatory Commission

unknown authors

2001-01-01T23:59:59.000Z

242

Next Generation Nuclear Plant: A Report to Congress | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Nuclear Plant: A Report to Congress Next Generation Nuclear Plant: A Report to Congress Next Generation Nuclear Plant: A Report to Congress The U.S. Department of Energy's (DOE's) Next Generation Nuclear Plant (NGNP) project helps address the President's goals for reducing greenhouse gas emissions and enhancing energy security. The NGNP project was formally established by the Energy Policy Act of 2005 (EPAct 2005), designated as Public Law 109-58, 42 USC 16021, to demonstrate the generation of electricity and/or hydrogen with a high-temperature nuclear energy source. The project is being executed in collaboration with industry, DOE national laboratories, and U.S. universities. The U.S. Nuclear Regulatory Commission (NRC) is responsible for licensing and regulatory oversight of the demonstration nuclear reactor.

243

Next Generation Nuclear Plant: A Report to Congress | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Nuclear Plant: A Report to Congress Next Generation Nuclear Plant: A Report to Congress Next Generation Nuclear Plant: A Report to Congress The U.S. Department of Energy's (DOE's) Next Generation Nuclear Plant (NGNP) project helps address the President's goals for reducing greenhouse gas emissions and enhancing energy security. The NGNP project was formally established by the Energy Policy Act of 2005 (EPAct 2005), designated as Public Law 109-58, 42 USC 16021, to demonstrate the generation of electricity and/or hydrogen with a high-temperature nuclear energy source. The project is being executed in collaboration with industry, DOE national laboratories, and U.S. universities. The U.S. Nuclear Regulatory Commission (NRC) is responsible for licensing and regulatory oversight of the demonstration nuclear reactor.

244

Predictive Services Department John B. Connally Building 301 Tarrow, Suite 304 College Station, Texas 77840-7896  

E-Print Network (OSTI)

. Connally Building 301 Tarrow, Suite 304 College Station, Texas 77840-7896 TEL 979/458-6530 FAX 979/458-7333 http://texasforestservice.tamu.edu Winter 2011 Wildland Fire Season Outlook for Texas September 24 days developing in the coming few weeks and months. Brad Smith, Fuels Analyst with the Texas Forest

245

Department of Energy Announces Funding to Support the Next Generation of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Support the Next to Support the Next Generation of American Scientists and Engineers Department of Energy Announces Funding to Support the Next Generation of American Scientists and Engineers March 10, 2011 - 12:00am Addthis WASHINGTON, DC - U.S. Department of Energy Secretary Steven Chu today announced the launch of two new fellowship programs designed to attract the country's best and brightest scientific minds to work on advanced clean energy technologies. The two fellowship programs - the Postdoctoral Fellowships Program and the SunShot Initiative Fellowships Program - will prepare budding scientists and engineers for careers in clean energy. These programs will increase American economic competitiveness and support job growth by promoting science, technology, engineering, and math (STEM)

246

ATTACHMENT FLOODPLAIN STATEMENT OF FINDINGS FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO SEMPRA GENERATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ATTACHMENT ATTACHMENT FLOODPLAIN STATEMENT OF FINDINGS FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO SEMPRA GENERATION FOR THE MESQUITE SOLAR ENERGY FACILITY NEAR GILLESPIE, ARIZONA The U.S. Department of Energy (DOE) has conducted an environmental assessment (EA) that analyzed the reasonably foreseeable environmental impacts associated with the nominal 400 megawatt (MW) photovoltaic solar power project and associated interconnection transmission line proposed by Sempra Generation (Sempra) for the Mesquite Solar Energy Facility (Mesquite) in Maricopa County, Arizona. The proposed project would utilize a photovoltaic (PV) solar panel technology that converts sunlight into direct current (DC) electricity. Inverters convert the DC power to alternating current (AC) power, and the AC power then flows to transformers

247

China and Russia to Join the Generation IV International Forum | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

China and Russia to Join the Generation IV International Forum China and Russia to Join the Generation IV International Forum China and Russia to Join the Generation IV International Forum July 13, 2006 - 3:03pm Addthis International Scope of Nuclear Nations Pursuing Advanced Reactors Broadens WASHINGTON, DC - U.S. Department of Energy Assistant Secretary for Nuclear Energy Dennis Spurgeon today announced that China and Russia are expected to join the Generation IV International Forum (GIF), a group of the world's leading nuclear nations who are working together to develop more efficient and less waste-intensive advanced reactors to meet future energy challenges. Earlier today, the GIF Policy Group voted unanimously to extend an offer of membership to China and Russia. China and Russia's formal entry into GIF is expected to be finalized by November 2006.

248

China and Russia to Join the Generation IV International Forum | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

China and Russia to Join the Generation IV International Forum China and Russia to Join the Generation IV International Forum China and Russia to Join the Generation IV International Forum July 13, 2006 - 3:03pm Addthis International Scope of Nuclear Nations Pursuing Advanced Reactors Broadens WASHINGTON, DC - U.S. Department of Energy Assistant Secretary for Nuclear Energy Dennis Spurgeon today announced that China and Russia are expected to join the Generation IV International Forum (GIF), a group of the world's leading nuclear nations who are working together to develop more efficient and less waste-intensive advanced reactors to meet future energy challenges. Earlier today, the GIF Policy Group voted unanimously to extend an offer of membership to China and Russia. China and Russia's formal entry into GIF is expected to be finalized by November 2006.

249

DOE Seeks Additional Input on Next Generation Nuclear Plant | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeks Additional Input on Next Generation Nuclear Plant Seeks Additional Input on Next Generation Nuclear Plant DOE Seeks Additional Input on Next Generation Nuclear Plant April 17, 2008 - 10:49am Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) today announced it is seeking public and industry input on how to best achieve the goals and meet the requirements for the Next Generation Nuclear Plant (NGNP) demonstration project work at DOE's Idaho National Laboratory. DOE today issued a Request for Information and Expressions of Interest from prospective participants and interested parties on utilizing cutting-edge high temperature gas reactor technology in the effort to reduce greenhouse gas emissions by enabling nuclear energy to replace fossil fuels used by industry for process heat. "This is an opportunity to advance the development of safe, reliable, and

250

New York Power Authority Identifies More than $ 1.75 Million in Savings Annually with RCM at Its Hydro Generating Stations  

Science Conference Proceedings (OSTI)

Member Quote"Working under the direction of the EPRI Solutions Team, NYPA's strategic goals of providing economical and reliable energy, are realized through an effort of applying the RCM process at our large hydro facilities."--Horace Horton, Regional Manager, Western New York, New York Power Authority In BriefThe New York Power Authority (NYPA) identified nearly $1.75 million in annual savings by applying reliability-centered maintenance (RCM) to the electrical equipment at its hydro generating station...

2006-08-29T23:59:59.000Z

251

Solid radioactive waste management facility design for managing CANDU{sup R} 600 MW nuclear generating station re-tube/refurbishment Waste Streams  

Science Conference Proceedings (OSTI)

The main design features of the re-tube canisters, waste handling equipment and waste containers designed by Atomic Energy of Canada Limited (AECL{sup R}) and implemented in support of the re-tube/refurbishment activities for Candu 600 MW nuclear generating stations are described in this paper. The re-tube/refurbishment waste characterization and the waste management principles, which form the basis of the design activities, are also briefly outlined. (authors)

Pontikakis, N.; Hopkins, J.; Scott, D.; Bajaj, V.; Nosella, L. [AECL, 2251 Speakman Drive, Mississauga, Ontario, L5K 1B2 (Canada)

2007-07-01T23:59:59.000Z

252

Xcel Energy Comanche Station: Pueblo, Colorado (Data)  

DOE Data Explorer (OSTI)

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

253

Xcel Energy Comanche Station: Pueblo, Colorado (Data)  

DOE Green Energy (OSTI)

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

2007-06-20T23:59:59.000Z

254

Comments by the Sierra Club in response to the Department of Energy Special  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by the Sierra Club in response to the Department of Energy by the Sierra Club in response to the Department of Energy Special Environmental Analysis for Actions Taken under the U.S Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia Comments by the Sierra Club in response to the Department of Energy Special Environmental Analysis for Actions Taken under the U.S Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia Docket No. EO-05-01. This letter is in response to the Department of Energy Special Environmental Analysis for Actions Taken under the U.S Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia. Comments by the Sierra Club in response to the Department of Energy Special

255

Field Testing of Behavioral Barriers for Fish Exclusion at Cooling-Water Intake Systems, Ontario Hydro Pickering Nuclear Generating Station  

Science Conference Proceedings (OSTI)

Depending on site-specific considerations, behavioral barriers such as sound and lights may be more effective, less expensive, and more environmentally suitable for excluding fish from power plant intakes than physical barriers. Specifically, field tests at Ontario Hydro's Pickering station on Lake Ontario indicated that behavioral barriers excluded alewife, an important prey species in the Great Lakes.

1989-03-15T23:59:59.000Z

256

Gravity Wave Generation around the Polar Vortex in the Stratosphere Revealed by 3-Hourly Radiosonde Observations at Syowa Station  

Science Conference Proceedings (OSTI)

Intensive radiosonde observations were performed at Syowa Station (69.0°S, 39.6°E) over about 10 days in each of March, June, October, and December 2002 to examine inertia–gravity wave characteristics in the Antarctic lower stratosphere. Based on ...

Kaoru Sato; Motoyoshi Yoshiki

2008-12-01T23:59:59.000Z

257

Department of Energy Announces $40 Million to Develop the Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Million to Develop the Next 0 Million to Develop the Next Generation Nuclear Plant Department of Energy Announces $40 Million to Develop the Next Generation Nuclear Plant March 8, 2010 - 12:00am Addthis WASHINGTON, DC - U.S. Secretary of Energy Steven Chu today announced selections for the award of approximately $40 million in total to two teams led by Pittsburgh-based Westinghouse Electric Co. and San Diego-based General Atomics for conceptual design and planning work for the Next Generation Nuclear Plant (NGNP). The results of this work will help the Administration determine whether to proceed with detailed efforts toward construction and demonstration of the NGNP. If successful, the NGNP Demonstration Project will demonstrate high-temperature gas-cooled reactor technology that will be capable of producing electricity as well as process

258

Department of Energy Announces $40 Million to Develop the Next Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40 Million to Develop the Next 40 Million to Develop the Next Generation Nuclear Plant Department of Energy Announces $40 Million to Develop the Next Generation Nuclear Plant March 9, 2010 - 12:47pm Addthis WASHINGTON, D.C. - U.S. Secretary of Energy Steven Chu today announced selections for the award of approximately $40 million in total to two teams led by Pittsburgh-based Westinghouse Electric Co. and San Diego-based General Atomics for conceptual design and planning work for the Next Generation Nuclear Plant (NGNP). The results of this work will help the Administration determine whether to proceed with detailed efforts toward construction and demonstration of the NGNP. If successful, the NGNP Demonstration Project will demonstrate high-temperature gas-cooled reactor technology that will be capable of producing electricity as well as process

259

Alternative Fueling Station Locator App Provides Info at Your...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department The Alternative Fueling Station Locator iPhone app helps you find...

260

Characterization of alternative electric generation technologies for the SPS comparative assessment: volume 2, central-station technologies  

DOE Green Energy (OSTI)

The SPS Concept Development and Evaluation Program includes a comparative assessment. An early first step in the assessment process is the selection and characterization of alternative technologies. This document describes the cost and performance (i.e., technical and environmental) characteristics of six central station energy alternatives: (1) conventional coal-fired powerplant; (2) conventional light water reactor (LWR); (3) combined cycle powerplant with low-Btu gasifiers; (4) liquid metal fast breeder reactor (LMFBR); (5) photovoltaic system without storage; and (6) fusion reactor.

Not Available

1980-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EA-1620: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1620: Final Environmental Assessment Burbank Hydrogen Fueling Station Project The City of Burbank currently operates a 12 kilogram per day 350 bar hydrogen generation and fueling station at its public works yard. The proposed Burbank hydrogen fueling station involves removal and replacement of the existing hydrogen fueling station equipment in order to utilize updated technology and meet a limited increase in demand for hydrogen fuel. DOE/EA-1620: Burbank Hydrogen Fueling Station Project Final Environmental Assessment (August 2008) More Documents & Publications EA-1620: Finding of No Significant Impact Department of Energy Technical Support Document National Environmental Policy Act Implementing Procedures Supplement to Notice of Proposed

262

Response from PJM Interconnection LLC and Pepco to Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection LLC and Pepco to Department of PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for information concerning the potential need for Potomac River Station generation under the three reliability "scenarios" outlined by PJM and PEPCO. Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation More Documents & Publications Information Concerning Reliability Impacts under Various System

263

Comments from the Sierra Club on the Department of Energy Emergency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Generating Station in Alexandria, VA Docket No. EO-05-01: This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the...

264

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

of Environmental Control, Illinois State Public Health Department, Illinois Atomic Energy Commission, and the U.S. Environmental Protection Agency. The DOE findings indicate...

265

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

OF NO SIGNIFICANT IMPACT for the PROPOSED CONSTRUCTION AND OPERATION OF A CELLULOSIC ETHANOL PLANT, TREUTLEN COUNTY, GEORGIA SUMMARY: The U. S. Department of Energy (DOE)...

266

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

OF NO SIGNIFICANT IMPACT for the PROPOSED CONSTRUCTION AND OPERATION OF A CELLULOSIC ETHANOL PLANT, TREUTLEN COUNTY, GEORGIA SUMMARY: In October 2007, the U. S. Department of...

267

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2006 DOEEA 1571 FINDING OF NO SIGNIFICANT IMPACT ENVIRONMENTAL ASSESSMENT For The Ohio State University, Ohio 4-H Center with Green Building Technologies AGENCY: Department...

268

Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011  

Science Conference Proceedings (OSTI)

The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

Juarez, Catherine L. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

269

Comments on Department of Energy's Emergency Order To Resume Limited  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Department of Energy's Emergency Order To Resume on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Docket No. EO-05-01: Riverkeeper, and the Anacostia Riverkeeper at Earth Conservation Corps, submits the following comments on the Department of Energy's December 20, 2005 Emergency Order 202-05-3 and on Mirant's proposed Compliance Plan filed pursuant to that Order. Dep't of Energy's Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, D.C., 71 Fed. Reg. 3279 (Jan. 20, 2006).

270

Response to Request for Additional Information regarding Request for Approval of the Cyber Security Plan San Onofre Nuclear Generating Station, Units 2 and 3  

E-Print Network (OSTI)

By letter dated July 22, 2010 (Reference) Southern California Edison submitted a license amendment request for approval of the Cyber Security Plan for San Onofre Nuclear Generating Station (SONGS) in accordance with 10 CFR 73.54. The purpose of this license amendment was to provide an Implementation Schedule, provide a table of SONGS deviations from NEI 08-09 Revision 6, and add a sentence to the existing Facilities Operating Licenses (FOL) license condition for Physical Security to require SCE to fully implement and maintain in effect all provisions of the Commission approved Cyber Security Plan. By e-mail dated March 1, 2011, the NRC requested additional information through three generic questions developed by the NRC staff following discussions with the Nuclear Energy Institute and the industry Cyber Security Task Force. Responses to the NRC request for additional information are provided in the Enclosure to this letter.

Southern Edison; Douglas R. Bauder

2011-01-01T23:59:59.000Z

271

Department  

Office of Legacy Management (LM)

u.s. Department of the Interior U.S. Geological Survey Analysis of Borehole-Radar Reflection Logs from Selected HC Boreholes at the Project Shoal Area, Churchill County, Nevada By...

272

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy (DOE) is proposing to provide federal funding to BlueFire Ethanol for the BlueFire Fulton Renewable Energy Project. BlueFire Ethanol is proposing to...

273

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Requestfor Proposals(RFP)No.DE-RP36-8G010219. Photovoltaic-Technology Specific Super Energy Savings Perfonnance Contract (PV SUPER ESPC) Solicitation for U.S. Department of...

274

Lowry Range Solar Station: Arapahoe County, Colorado (Data)  

DOE Data Explorer (OSTI)

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Yoder, M.; Andreas, A.

275

Nevada Power: Clark Station; Las Vegas, Nevada (Data)  

DOE Data Explorer (OSTI)

A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

276

Nevada Power: Clark Station; Las Vegas, Nevada (Data)  

Science Conference Proceedings (OSTI)

A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

2006-03-27T23:59:59.000Z

277

Lowry Range Solar Station: Arapahoe County, Colorado (Data)  

DOE Green Energy (OSTI)

A partnership with industry and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Yoder, M.; Andreas, A.

2008-05-30T23:59:59.000Z

278

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

501 - 10510 of 28,905 results. 501 - 10510 of 28,905 results. Download Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia http://energy.gov/oe/downloads/special-environmental-analysis-actions-taken-under-us-department-energy-emergency Download SEA-04: Special Environmental Analysis Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia http://energy.gov/nepa/downloads/sea-04-special-environmental-analysis Download Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 44 Fed Reg 65560)

279

Department  

Office of Legacy Management (LM)

u.s. u.s. Department of the Interior U.S. Geological Survey Analysis of Borehole-Radar Reflection Logs from Selected HC Boreholes at the Project Shoal Area, Churchill County, Nevada By John W. Lane, Jr., Peter K. Joesten, Greg Pohll, and Todd Mihevic Water-Resources Investigations Report 01-4014 Prepared in cooperation with the U.S. Department of Energy Storrs, Connecticut 2001 U.S. DEPARTMENT OF THE INTERIOR GALE A. NORTON, Secretary U.S. GEOLOGICAL SURVEY Charles G. Groat, Director The use of firm, trade, and brand names in this report is for identification purposes only and does not constitute endorsement by the U.S. Government. For additional information write to: Branch Chief U.S. Geological Survey, Office of Ground Water Branch of Geophysical Applications & Support 11 Sherman Place, U-5015 Storrs Mansfield, CT 06269 http://water.usgs.gov/ogw/bgas Copies of this

280

U.S. Department of Energy ANNUAL ELECTRIC GENERATOR Form Approved ...  

U.S. Energy Information Administration (EIA)

U.S. Department of Energy ... (5-year plans) plants that: 1 ... has a working interest in the plant and who is responsible for making the strategic decisions

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Solar Radiation Monitoring Station (SoRMS): Humboldt State University, Arcata, California (Data)  

DOE Data Explorer (OSTI)

A partnership with HSU and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location.

Wilcox, S..; Andreas, A.

282

Solar Radiation Monitoring Station (SoRMS): Humboldt State University, Arcata, California (Data)  

Science Conference Proceedings (OSTI)

A partnership with HSU and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location.

Wilcox, S..; Andreas, A.

2007-05-02T23:59:59.000Z

283

Analysis of the Use of Wind Energy to Supplement the Power Needs at McMurdo Station and Amundsen-Scott South Pole Station, Antarctica (Poster)  

DOE Green Energy (OSTI)

This poster summarizes the analysis of the inclusion of wind-driven power generation technology into the existing diesel power plants at two U.S. Antarctic research stations, McMurdo and Amundsen-Scott South Pole Station. Staff at the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) conducted the analysis. Available data were obtained on the wind resources, power plant conditions, load, and component cost. We then used NREL's Hybrid2 power system modeling software to analyze the potential and cost of using wind turbine generators at the two aforementioned facilities.

Baring-Gould, E. I.; Robichaud, R.; McLain, K.

2005-05-01T23:59:59.000Z

284

Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: Date: August 28, 2006 Re: LICENSE ACQUISITION UPON CONTRACTING When a contract for supplies or services is negotiated, the contractor sometimes proposes that patent royalties under a license agreement with a third party be recognized as allowable costs. The license agreement may be a pre-existing agreement, or it may be a proposed agreement that is to be entered into contemporaneously with the Government contract for the purpose of the contract work. This letter sets forth the policy to be followed in approving or rejecting such proposed license arrangements. The legal authority for the Department to acquire patent licenses and, hence, to reimburse contractors for patent license costs, is described in the Appendix hereto. In summary, the Department has such legal authority for contracts not requiring patent indemnity under the Federal Acquisition Regulations (FAR). FAR (48

285

Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Economic Economic and Community Development William Snodgrass/Tennessee Tower Building, 11th Floor, 312 8th Avenue North, Nashville, Tennessee 37243 615-741-1888/ FAX: 615-741-7306 Matthew Kisber Commissioner January 20, 2009 Phil Bredesen Governor Mr, Paul Gottlieb Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Ave., SW. Washington, DC 20585 Dear Mr. Gottlieb, I am writing to express my strong support for the U.S. Department of Energy's initiative to simplify rules and regulations governing contractual agreements between the state of Tennessee and Oak Ridge National Lab. Tennessee Governor Phil Bredesen is a physicist by training and both he and I consider ORNL one of the most important assets our state possesses in our effort to gamer new investment into the state and create skilled jobs for our citizens.

286

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Economic Economic and Community Development William Snodgrass/Tennessee Tower Building, 11th Floor, 312 8th Avenue North, Nashville, Tennessee 37243 615-741-1888/ FAX: 615-741-7306 Matthew Kisber Commissioner January 20, 2009 Phil Bredesen Governor Mr, Paul Gottlieb Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Ave., SW. Washington, DC 20585 Dear Mr. Gottlieb, I am writing to express my strong support for the U.S. Department of Energy's initiative to simplify rules and regulations governing contractual agreements between the state of Tennessee and Oak Ridge National Lab. Tennessee Governor Phil Bredesen is a physicist by training and both he and I consider ORNL one of the most important assets our state possesses in our effort to gamer new investment into the state and create skilled jobs for our citizens.

287

Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Department of Energy Transmission Congestion Study Workshop Comments of the New York Independent System Operator By John P. Buechler Executive Regulatory Policy Advisor Hartford, CT July 9,2008 GOOD MORNING. ON BEHALF OF THE NYISO, I'D LIKE TO THANK THE DOE FOR THEIR INVITATION TO PARTICIPATE IN TODAY'S WORKSHOP. WE APPRECIATE THE SIGNIFICANT EFFORT THAT THE DOE IS ABOUT TO UNDERTAKE AS PART OF YOUR RESPONSIBILITIES UNDER EPACT 2005. NYISO, IN CONJUNCTION WITH THE ISOIRTO COUNCIL'S PLANNING COMMITTEE, PROVIDED SUBSTANTIAL INFORMATION TO THE DOE IN SUPPORT OF THE FIRST CONGESTION STUDY-ISSUED IN 2006-AND ONCE AGAIN WE STAND READY TO OFFER OUR ASSISTANCE FOR THE 2009 CONGESTION STUDY. NYISO BACKGROUND NYISO IS A STRONG SUPPORTER OF MARKET-BASED SOLUTIONS FOR MEETING BOTH RELIABILITY AND ECONOMIC NEEDS. THIS PHILOSOPHY IS REFLECTED IN THE DESIGN OF THE NYISO'S WHOLESALE MARKETS

288

Three Mile Island Generating Station  

E-Print Network (OSTI)

ii TABLE OF CONTENTS I. Executive Summary................................................................................................................ 1 II. Introduction............................................................................................................................. 3 III. Exercise Overview.............................................................................................................. 6

Technological Hazards Branch

2009-01-01T23:59:59.000Z

289

Supplemental Comments on the Department of Energy's Emergency Order To  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on the Department of Energy's Emergency on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Supplemental Comments on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Docket No. EO-05-01: The Institute for Public Representation, on behalf of the Anacostia Riverkeeper at Earth Conservation Corps, the Patuxent Riverkeeper, and the Potomac Riverkeeper, Inc., submits the following comments pursuant to the Department of Energy's (DOE's) February 17 Order for Rehearing Emergency Order 202-05-3. District of Columbia Public Service Commission, Docket No. EO-05-01, Order No. 202-06-01 (Dep't of Energy, Feb. 17, 2006). Supplemental Comments on the Department of Energy's Emergency Order To

290

Comments from the Sierra Club on the Department of Energy Emergency Order  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from the Sierra Club on the Department of Energy Emergency from the Sierra Club on the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station in Alexandria, VA Comments from the Sierra Club on the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station in Alexandria, VA Docket No. EO-05-01: This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC. We are very disappointed with your decision to allow limited operation of the Mirant Plant. We are rather troubled that, despite the overwhelming scientific evidence of the risks posed by this facility, electrical

291

Generation-IV Roadmap Report of the Fuel Cycle Crosscut Group | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation-IV Roadmap Report of the Fuel Cycle Crosscut Group Generation-IV Roadmap Report of the Fuel Cycle Crosscut Group Generation-IV Roadmap Report of the Fuel Cycle Crosscut Group The Charter of the Generation IV Roadmap Fuel Cycle Crosscut Group (FCCG) is to (1) examine the fuel cycle implications for alternative nuclear power scenarios in terms of Generation IV goals and (2) identify key fuel cycle issues associated with Generation IV goals. This included examination of "fuel resource inputs and waste outputs for the range of potential Generation IV fuel cycles, consistent with projected energy demand scenarios." This report summarizes the results of the studies. The membership of the FCCG comprised 8 US members and 7 members from Generation IV International Forum (GIF) countries including members from

292

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 20550 of 26,764 results. 41 - 20550 of 26,764 results. Article Energy Department Launches Alternative Fueling Station Locator App As part of the Obama Administration's commitment to expand access to data and give consumers more transportation options that save money at the pump, the Energy Department today launched a new... http://energy.gov/eere/articles/energy-department-launches-alternative-fueling-station-locator-app Page Better Buildings Challenge http://energy.gov/eere/better-buildings-challenge Article Advancing Small Modular Reactors: How We're Supporting Next-Gen Nuclear Energy Technology Learn about the Energy Department's support for the next-generation nuclear energy technology -- small modular reactors. http://energy.gov/articles/advancing-small-modular-reactors-how-were-supporting-next-gen-nuclear-energy-technology

293

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Basic Basic Energy Sciences" on February 9-10,2010 in the Washington, DC, area. This workshop is organized by the Department of Energy's Offices of Basic Energy Sciences (BES) and Advanced Scientific Computing Research (ASCR). The workshop's goal is to characterize BES production computing requirements over the next 5-10 years at NERSC, the National Energy Research Scientific Computing Center. NERSC is the principal provider of production High Performance Computing (HPC) facilities and services for the Office of Science (SC). The mission of NERSC is to accelerate the pace of scientific discovery by providing computing, information, data, and communications services for research sponsored by SC. NERSC supports the largest and most diverse research community of any computing facility within DOE. Requirements collected at the workshop will help NERSC plan for future systems

294

Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September September 9, 2011 Dr. Donald Bridges, Chair Savannah River Site Citizens Advisory Board P.O. Box A, Building 730-B, Room 1184 Aiken, South Carolina 29802 Dear Dr. Bridges: Thank you for your August 11, 2011, letter welcoming me as Acting Assistant Secretary for Environmental Management (EM). It is a great honor to return to EM where I spent my early years with the Department of Energy (DOE). I am aware of how valuable the work of the Environmental Management Site-Specific Advisory Board (EM SSAB) is to the EM program. EM SSAB is DOE's only citizen advisory board and serves as a unique forum for EM to connect and involve members of the public in EM cleanup decisions. Considering my past service and your consistent dedication, we will continue to collaborate on cleanup activities at the sites and ensure that communities remain well informed and involved with EM site-specific issues. I look

295

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Carlsbad Carlsbad Field Office P. O . Box 3090 Carlsbad . New Me xico 88221 N OV 1 9 2012 Mr. John E. Kieling, Chief Hazardou s W aste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Waste Isolation Pilot Plant Annual Waste Minimization Report Dear Mr. Kieling: The purpose of this letter is to provide you with the Waste Isolation Pilot Plant Annua l Waste Minimization Report. This report is required by and has been prepared in accordance with the W IPP Hazardous Waste Facility Permit Part 2, Perm it Condition 2.4. We certify under penalty of law that this document and all attachments were prepared under our direction or supervision according to a system designed to assure that qualified personnel properly ga the r and eval uate the information submitted. Based on our inquiry of the person or persons who manage the

296

Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Nuclear Physics," on May 26-27,2011, in Bethesda, MD (Washington, DC area). This workshop is organized by the Department of Energy's Offices of Nuclear Physics (NP) and Advanced Scientific Computing Research (ASCR). The workshop's goal is to characterize NP production computing requirements over the next 3 - 5 years at NERSC,the National Energy Research Scientific Computing Center. NERSCis the principal provider of production High Performance Computing (HPC) facilities and services for the Office of Science (SC). The mission of NERSCis to accelerate the pace of scientific discovery by providing computing, information, data, and communications services for research sponsored by sc. NERSCsupports the largest and most diverse research community of any computing facility within DOE. Requirements collected at the workshop will help NERSCplan for future systems and

297

Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Oak Ridge Office P.O. Box 2001 Oak Ridge, Tennessee 37831 January 28, 2011 MEMORANDUM FOR SCOTTBLAKEHARRIS GENERALCOUNSEL GC-1, HOJFORS FROM: GERALD SUBJECT: ANNUAL NATIONAL ENVIRONMENTAL POLICYACT PLANNING SUMMARY FOR2011- OAK RIDGEOFFICE This correspondence transmits the Annual National Environmental Policy Act (NEPA) Planning Summary for 2011 for the Oak Ridge Office (ORO). This is in accordance with the June 1994 Secretarial Policy Statement on NEPA and Department of Energy Order 451.1B. The attached summary provides a brief description of the status of ongoing NEPA compliance activities. No new Environmental Assessments are expected to be needed in the next 12 months and no Environmental Impact Statements are expected to be required in the next 24 months. The summary will be made available for public review at the Public Reading Room in Oak Ridge, Tennessee. If you have

298

Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: May 21,2008 SUBJECT: Fonnat of Petition for Advance Waiver of Patent Rights The attached document sets forth the fonnat to be used by field patent counsel for a Petition for an Advance Waiver of Patent Rights under 10 CFR 784. ~ Ja ' ,. ~ " " j ", .., lY CQ i -.-- Paul A GotiIi b Assistant General Counsel for Technology Transfer and Intellectual Property 1 * Printed with soy ink on recycled paper UNITED STATES DEPARTMENT OF ENERGY PETITION FOR ADVANCE WAIVER OF PATENT RIGHTS UNDER 10 C.F.R. PART 784 DOE WAIVER NO. (To be supplied by DOE) Notice: If you need help in completin9..1hisform. contact t~atent Counsel assisting the activity that is issuing your award or the Assistant General Counsel for Technology Transfer and Intellectual Property in the Office of General Counsel in DOE Headauarters. Visit: www.gc.energy.gov/documents/lntellectual Property (IP) Service

299

Solar Energy Potential | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fueling Station Locator Energy Department National Labs and Minority Serving Institutions Energy Department National Labs and Minority Serving Institutions Solar Decathlon: How far...

300

Audit Report: IG-0761 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

761 Audit Report: IG-0761 March 26, 2007 The Department of Energy's Management of Contractor Intergovernmental Personnel and Change of Station Assignments The Department of...

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Audit Report: IG-0761 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Audit Report: IG-0761 March 26, 2007 The Department of Energy's Management of Contractor Intergovernmental Personnel and Change of Station Assignments The Department of Energy's...

302

Mobile Alternative Fueling Station Locator  

Science Conference Proceedings (OSTI)

The Department of Energy's Alternative Fueling Station Locator is available on-the-go via cell phones, BlackBerrys, or other personal handheld devices. The mobile locator allows users to find the five closest biodiesel, electricity, E85, hydrogen, natural gas, and propane fueling sites using Google technology.

Not Available

2009-04-01T23:59:59.000Z

303

EIS-0476: Vogtle Electric Generating Plant, Units 3 and 4 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: Vogtle Electric Generating Plant, Units 3 and 4 76: Vogtle Electric Generating Plant, Units 3 and 4 EIS-0476: Vogtle Electric Generating Plant, Units 3 and 4 Summary This EIS evaluates the environmental impacts of construction and startup of the proposed Units 3 and 4 at the Vogtle Electric Generating Plant in Burke County, Georgia. DOE adopted two Nuclear Regulatory Commission EISs associated with this project (i.e., NUREG-1872, issued 8/2008, and NUREG-1947, issued 3/2011). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download February 17, 2012 EIS-0476: Notice of Adoption of Final Environmental Impact Statement Vogtle Electric Generating Plant, Units 3 and 4, Issuance of a Loan Guarantee to Support Funding for Construction, Burke County, GA

304

Illinois Nuclear Profile - Clinton Power Station  

U.S. Energy Information Administration (EIA) Indexed Site

Clinton Power Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

305

Massachusetts Nuclear Profile - Pilgrim Nuclear Power Station  

U.S. Energy Information Administration (EIA) Indexed Site

Pilgrim Nuclear Power Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer cpacity factor (percent)","Type","Commercial operation date","License...

306

Annual Cycle and Depth Penetration of Wind-Generated Near-Inertial Internal Waves at Ocean Station Papa in the Northeast Pacific  

Science Conference Proceedings (OSTI)

The downward propagation of near-inertial internal waves following winter storms is examined in the context of a 2-yr record of velocity in the upper 800 m at Ocean Station Papa. The long time series allow accurate estimation of wave frequency, ...

Matthew H. Alford; Meghan F. Cronin; Jody M. Klymak

2012-06-01T23:59:59.000Z

307

Using Experience to Train the Next Generation of Workers | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Using Experience to Train the Next Generation of Workers Using Experience to Train the Next Generation of Workers Using Experience to Train the Next Generation of Workers July 5, 2011 - 1:46pm Addthis Bob Wilds working at a winding machine. | Photo Courtesy of Waukesha Electric Systems Bob Wilds working at a winding machine. | Photo Courtesy of Waukesha Electric Systems Lindsey Geisler Lindsey Geisler Public Affairs Specialist, Office of Public Affairs Bob Wilds has worked at Waukesha Electric Systems for the last 12 years as a coil winder. Waukesha Electric Systems makes transformers -- an essential part of the electric grid, transferring electrical current from one circuit to another. The coils that Bob works with are one of the most important components that make transformers work. The component involves winding insulated copper wire, but workers involved in transformer

308

Five Years of Building the Next Generation of Reactors | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Years of Building the Next Generation of Reactors Five Years of Building the Next Generation of Reactors Five Years of Building the Next Generation of Reactors August 15, 2012 - 5:17pm Addthis Simulated three-dimensional fission power distribution of a single 17x17 rod PWR fuel assembly. | Photo courtesy of the Consortium for Advanced Simulation of Light Water Reactors (CASL). Simulated three-dimensional fission power distribution of a single 17x17 rod PWR fuel assembly. | Photo courtesy of the Consortium for Advanced Simulation of Light Water Reactors (CASL). Doug Kothe Director, Consortium for Advanced Simulation of Light Water Reactors What are the key facts? CASL has the virtual capability to look closely at reactor core models. These models operate with 193 fuel assemblies, nearly 51,000 fuel rods, and about 18 million fuel pellets.

309

Paving the path for next-generation nuclear energy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paving the path for next-generation nuclear energy Paving the path for next-generation nuclear energy Paving the path for next-generation nuclear energy May 6, 2013 - 2:26pm Addthis Renewed energy and enhanced coordination are on the horizon for an international collaborative that is advancing new, safer nuclear energy systems. Renewed energy and enhanced coordination are on the horizon for an international collaborative that is advancing new, safer nuclear energy systems. Deputy Assistant Secretary Kelly Deputy Assistant Secretary Kelly Deputy Assistant Secretary for Nuclear Reactor Technologies Nuclear power reactors currently under construction worldwide boast modern safety and operational enhancements that were designed by the global nuclear energy industry and enhanced through research and development (R&D)

310

Hybrid Solar-Wind Generates Savings for South Dakota City | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hybrid Solar-Wind Generates Savings for South Dakota City Hybrid Solar-Wind Generates Savings for South Dakota City Hybrid Solar-Wind Generates Savings for South Dakota City July 19, 2010 - 4:05pm Addthis What does this project do? The projects will reduce the city's natural gas and electric bills by an estimated $2,700. An array of six solar panels, similar to the ones shown, will be installed at Colton, S.D.'s city hall. | Photo courtesy of Colton. The city of Colton, South Dakota. is a small, agriculturally-based community. So small that Mayor Erik Miller says if his two Labrador retrievers ever got lost, local residents would have no trouble finding them. "Colton is like taking a trip to the past," says Miller. Still, the mayor is looking to create a new energy future for Colton, deploying one small-scale solar and two solar-wind hybrid systems, and

311

Alternative Fueling Station Locator | Open Energy Information  

Open Energy Info (EERE)

Alternative Fueling Station Locator Alternative Fueling Station Locator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Alternative Fueling Station Locator Agency/Company /Organization: United States Department of Energy Partner: National Renewable Energy Laboratory Sector: Energy Focus Area: Fuels & Efficiency, Transportation Phase: Evaluate Options, Prepare a Plan Topics: Datasets Resource Type: Online calculator User Interface: Website Website: www.afdc.energy.gov/afdc/locator/stations/ Web Application Link: www.afdc.energy.gov/afdc/locator/stations/ Cost: Free OpenEI Keyword(s): Featured References: National Renewable Energy Laboratory Advanced Vehicles and Fuels Research: Data and Resources[1] Logo: Alternative Fueling Station Locator The alternative fuel station locator uses an address based search to find

312

Replacement Capability for Disposal of Remote-Handled Low-Level Waste Generated at the Department of Energys Idaho Site  

NLE Websites -- All DOE Office Websites (Extended Search)

93 93 Environmental Assessment for the Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site Final December 2011 Department of Energy Idaho Operations Office 1955 Fremont Avenue Idaho Falls, ID 83415 December 21, 2011 Dear Citizen: The U.S. Department of Energy (DOE) has completed the Final Environmental Assessment (EA) for the Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site and determined that a Finding of No Significant Impact (FONSI) is appropriate. The draft EA was made available for an 81-day public review and comment period on September 1,2011. DOE considered all comments made

313

Alternative Fueling Station Locator - Mobile | Open Energy Information  

Open Energy Info (EERE)

Fueling Station Locator - Mobile Fueling Station Locator - Mobile Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Alternative Fueling Station Locator - Mobile Agency/Company /Organization: United States Department of Energy Partner: National Renewable Energy Laboratory Sector: Energy Focus Area: Transportation Phase: Evaluate Options, Prepare a Plan Resource Type: Online calculator User Interface: Mobile Device Website: www.afdc.energy.gov/afdc/locator/m/stations/ Web Application Link: www.afdc.energy.gov/afdc/locator/m/stations/ Cost: Free References: National Renewable Energy Laboratory Advanced Vehicles and Fuels Research: Data and Resources[1] Logo: Alternative Fueling Station Locator - Mobile Find fueling stations for your alternative fuel vehicle on-the-go with the

314

Development of a Turnkey Hydrogen Fueling Station Final Report  

Science Conference Proceedings (OSTI)

The transition to hydrogen as a fuel source presents several challenges. One of the major hurdles is the cost-effective production of hydrogen in small quantities (less than 1MMscf/month). In the early demonstration phase, hydrogen can be provided by bulk distribution of liquid or compressed gas from central production plants; however, the next phase to fostering the hydrogen economy will likely include onsite generation and extensive pipeline networks to help effect a pervasive infrastructure. Providing inexpensive hydrogen at a fleet operator’s garage or local fueling station is a key enabling technology for direct hydrogen Fuel Cell Vehicles (FCVs). The objective of this project was to develop a comprehensive, turnkey, stand-alone, commercial hydrogen fueling station for FCVs with state-of-the-art technology that is cost-competitive with current hydrocarbon fuels. Such a station would promote the advent of the hydrogen fuel economy for buses, fleet vehicles, and ultimately personal vehicles. Air Products, partnering with the U.S. Department of Energy (DOE), The Pennsylvania State University, Harvest Energy Technology, and QuestAir, developed a turnkey hydrogen fueling station on the Penn State campus. Air Products aimed at designing a station that would have 65% overall station efficiency, 82% PSA (pressure swing adsorption) efficiency, and the capability of producing hydrogen at $3.00/kg (gge) H2 at mass production rates. Air Products designed a fueling station at Penn State from the ground up. This project was implemented in three phases. The first phase evaluated the various technologies available in hydrogen generation, compression, storage, and gas dispensing. In the second phase, Air Products designed the components chosen from the technologies examined. Finally, phase three entailed a several-month period of data collection, full-scale operation, maintenance of the station, and optimization of system reliability and performance. Based on field data analysis, it was determined by a proprietary hydrogen-analysis model that hydrogen produced from the station at a rate of 1500 kg/day and when produced at 1000 stations per year would be able to deliver hydrogen at a price of $3.03/kg (gge) H2. The station’s efficiency was measured to be 65.1%, and the PSA was tested and ran at an efficiency of 82.1%, thus meeting the project targets. From the study, it was determined that more research was needed in the area of hydrogen fueling. The overall cost of the hydrogen energy station, when combined with the required plot size for scaled-up hydrogen demands, demonstrated that a station using steam methane reforming technology as a means to produce on–site hydrogen would have limited utility in the marketplace. Alternative hydrogen supplies, such as liquid or pipeline delivery to a refueling station, need to be included in the exploration of alternative energy site layouts. These avenues need to be explored before a definitive refueling station configuration and commercialization pathway can be determined.

David E. Guro; Edward Kiczek; Kendral Gill; Othniel Brown

2010-07-29T23:59:59.000Z

315

Replacement Capability for Disposal of Remote-Handled Low-Level Waste Generated at the Department of Energys Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site August 2011 DOE/EA-1793 Draft Environmental Assessment for the Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site August 2011 v EXECUTIVE SUMMARY The U.S. Department of Energy (DOE) proposes to provide replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Historically, INL has disposed of this LLW onsite. However, the existing disposal area located within the INL Radioactive Waste Management Complex will undergo

316

Robotic dissolution station  

DOE Patents (OSTI)

This invention is comprised of a robotic station for dissolving active metals in acid in an automated fashion. A vessel with cap, containing the active metal is placed onto a shuttle which retracts to a point at which it is directly beneath a cap removing and retaining mechanism. After the cap is removed, a tube carrying an appropriate acid is inserted into the vessel, and the acid is introduced. The structure of the station forms an open hood which is swept of gases generated by the dissolution and the air removed to a remote location for scrubbing. After the reaction is complete, the shuttle extends and the vessel may be removed by a robot arm.

Beugelsdijk, T.J.; Hollen, R.M.; Temer, D.J.; Haggart, R.J.; Erkkila, T.H.

1991-12-31T23:59:59.000Z

317

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 18930 of 28,905 results. 21 - 18930 of 28,905 results. Download Microsoft PowerPoint- ShanasBioSlides121307 http://energy.gov/management/downloads/microsoft-powerpoint-shanasbioslides121307 Download Ammendment 5.doc http://energy.gov/management/downloads/ammendment-5doc0 Download Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage http://energy.gov/oe/downloads/re-potomac-river-generating-station-department-energy-case-no-eo-05-01-pepco-providing Download Nuclear Energy Research Advisory Committee (NERAC) Meeting of November 3 and 4, 2003 http://energy.gov/downloads/nuclear-energy-research-advisory-committee-nerac-meeting-november-3-and-4-2003 Download Microsoft PowerPoint- WH Energy and Climate Stakeholders 10-7-09

318

Solar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy's 1.6 billion loan guarentee will support Bright Source's Ivanpah Solar Energy Generating System. | courtesy of Bright Source Department Announces Loan...

319

The Navy seeks to identify responsible sources and obtain information in regard to purchasing renewable power for Naval Air Station (NAS) Fallon, located in Fallon, NV  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUEST FOR INFORMATION (RFI) for Renewable Generation REQUEST FOR INFORMATION (RFI) for Renewable Generation Opportunities at NAWS China Lake, NAS Fallon, MCAGCC 29 Palms, and MCAS Yuma The Department of Navy (DoN) intends to issue a Request for Proposal (RFP) in early 2009 for renewable energy generation opportunities at Naval Air Weapons Station (NAWS) China Lake, California; Naval Air Station (NAS) Fallon, Nevada; Marine Corps Air Ground Combat Center (MCAGCC) Twentynine Palms, California, and Marine Corps Air Station (MCAS) Yuma, Arizona. The DoN will consider opportunities for the purchase of renewable power, developer wholesale generation, distributed generation, and the combination of those opportunities. Specifically, the Navy will provide Government land on these installations for large

320

Rethink DC Metro Stations.  

E-Print Network (OSTI)

??This thesis intends to rethink the role of Metro stations in the Washington Metropolitan Area. It considers Metro stations as more than infrastructure, but with… (more)

Leung, Yathim

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Comments from the Virginia Department of Environmental Quality on PEPCO's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from the Virginia Department of Environmental Quality on from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Docket No. EO-05-01. Comments from the Virginia Department of Environmental Quality on PEPCO's intention to commence planned transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed

322

California's Zero-Emission Vehicle Mandate: Linking Clean-Fuel Cars, Carsharing and Station Car Strategies  

E-Print Network (OSTI)

of first-generation electric cars. Although shared use isfor instance in the electric station car programs of thewas a series of electric station car programs launched in

Shaheen, Susan; Sperling, Dan; Wright, John

2004-01-01T23:59:59.000Z

323

California's Zero Emission Vehicle Mandate - Linking Clean Fuel Cars, Carsharing, and Station Car Strategies  

E-Print Network (OSTI)

of first- generation electric cars. While shared use is thefor instance in the electric station car programs of thewas a series of electric station car programs launched in

Shaheen, Susan; Wright, John; Sperling, Daniel

2001-01-01T23:59:59.000Z

324

Replacement Capability for Disposal of Remote-Handled Low-Level Waste Generated at the Department of Energys Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT FOR THE ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT CAPABILITY FOR THE DISOPOSAL OF REMOTE-HANDLED LOW-LEVEL RADIOACTIVE WASTE GENERATED AT THE DEPARTMENT OF ENERGY'S IDAHO SITE Agency: U. S. Department of Energy (DOE) Action: Finding ofNo Significant Impact (FONSI) Summary: Operations conducted in support ofIdaho National Laboratory (INL) and Naval Reactors Facility (NRF) missions on the Idaho site generate low-level radioactive waste (LL W). DOE classifies some of the LL W generated at the INL as remote-handled LL W because its potential radiation dose is high enough to require additional protection of workers using distance and shielding. Remote-handled wastes are those with radiation levels exceeding 200 millirem

325

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 9960 of 31,917 results. 51 - 9960 of 31,917 results. Download Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME http://energy.gov/oe/downloads/mirant-potomac-alexandria-virginia-maximum-impacts-predicted-aermod-prime Download Comments from the City of Alexandria in Support of the Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages http://energy.gov/oe/downloads/comments-city-alexandria-support-comments-virginia-department-environmental-quality Download Comments by the Sierra Club in response to the Department of Energy Special Environmental Analysis for Actions Taken under the U.S Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

326

Special Environmental Analysis For Actions Taken under U.S. Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Environmental Analysis For Actions Taken under U.S. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia Docket No. EO-05-01. On December 20, 2005, the Secretary of Energy issued an emergency order, DOE Order 202-05-03, requiring Mirant's Potomac River Generating Station in Alexandria, Virginia, to operate under limited circumstances. On September 28, 2006, the Secretary extended the Order, including all of its terms and conditions, DOE Order 202-06-2, until December 1, 2006. This SEA includes descriptions of the DOE

327

Notice of Availability of a Special Environmental Analysis; Potomac Generating Station, Alexandria, Virginia (DOE/SEA-04)(11/29/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9102 Federal Register 9102 Federal Register / Vol. 71, No. 229 / Wednesday, November 29, 2006 / Notices Dated: November 22, 2006. Angela Somma, Chief, Endangered Species Division, Office of Protected Resources, National Marine Fisheries Service. [FR Doc. 06-9454 Filed 11-28-06; 8:45 am] BILLING CODE 3510-22-S DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration [I.D. 111306A] Marine Mammals; File No. 1053-1825 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; issuance of permit. SUMMARY: Notice is hereby given that David Mann, Ph.D., College of Marine Science, The University of South Florida, College of Marine Science, 140 Seventh Avenue South, St. Petersburg, FL 33701 has been issued a permit to

328

Alternative Fueling Station Locator App Provides Info at Your Fingertips |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Fueling Station Locator App Provides Info at Your Alternative Fueling Station Locator App Provides Info at Your Fingertips Alternative Fueling Station Locator App Provides Info at Your Fingertips November 15, 2013 - 10:12am Addthis The Alternative Fueling Station Locator iPhone app helps you find fueling stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department The Alternative Fueling Station Locator iPhone app helps you find fueling stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department Shannon Brescher Shea Communications Manager, Clean Cities Program Smartphone users are familiar with the prompt, "Would you like this site to use your current location?" If you're looking for somewhere to fuel your

329

Alternative Fueling Station Locator App Provides Info at Your Fingertips |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Fueling Station Locator App Provides Info at Your Alternative Fueling Station Locator App Provides Info at Your Fingertips Alternative Fueling Station Locator App Provides Info at Your Fingertips November 15, 2013 - 10:12am Addthis The Alternative Fueling Station Locator iPhone app helps you find fueling stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department The Alternative Fueling Station Locator iPhone app helps you find fueling stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department Shannon Brescher Shea Communications Manager, Clean Cities Program Smartphone users are familiar with the prompt, "Would you like this site to use your current location?" If you're looking for somewhere to fuel your

330

Iowa / Nebraska Distributed Wind Generation Projects First and Second-Year Operating Experience: 1999-2001: U.S. Department of Energ y - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

The Wind Turbine Verification Program (TVP) is a collaborative effort of the U.S. Department of Energy (DOE), EPRI, and host utilities to develop, construct, and operate wind power plants. This report describes the first- and second-year operating experience at the 2.25-MW Iowa Distributed Wind Generation Project (IDWGP) in Algona, Iowa, and the 1.5-MW Nebraska Distributed Wind Generation Project (NDWGP) in Springview, Nebraska. The lessons learned in both projects will be valuable to other utilities pla...

2001-12-03T23:59:59.000Z

331

Analysis of the Use of Wind Energy to Supplement the Power Needs at McMurdo Station and Amundsen-Scott South Pole Station, Antarctica  

DOE Green Energy (OSTI)

This report summarizes an analysis of the inclusion of wind-driven power generation technology into the existing diesel power plants at two U.S. Antarctic research stations, McMurdo and Amundsen-Scott South Pole Station. Staff at the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) conducted the analysis. Raytheon Polar Services, which currently holds the private sector support contract for the two research stations, was a major contributor to this report. To conduct the analysis, available data were obtained on the wind resources, power plant conditions, load, and component cost. Whenever possible, we validated the information. We then used NREL's Hybrid2 power system modeling software to analyze the potential and cost of using wind turbine generators at the two aforementioned facilities. Unfortunately, the power systems and energy allocations at McMurdo and South Pole Station are being redeveloped, so it is not possible to validate future fuel use. This report is an initial assessment of the potential use of wind energy and should be followed by further, more detailed analysis if this option is to be considered further.

Baring-Gould, I.; Robichaud, R.; McLain, K.

2005-05-01T23:59:59.000Z

332

Alternative Fueling Station Locator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act Field Projects DOE Recovery Act Field Projects DOE National Laboratories DOE National Laboratories eGallon eGallon...

333

Alternative Fueling Station Locator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rooftop Solar Challenge NEUP Award Recipients NEUP Award Recipients 2011 Grants for Offshore Wind Power 2011 Grants for Offshore Wind Power 2011 Grants for Advanced...

334

CAISO Station Displays  

Science Conference Proceedings (OSTI)

The objective of this report is to describe the results of a project to build Station One-Line Diagram displays for the California Independent System Operator (CAISO) system. The development and maintenance of the Station One-line displays for energy management system applications has historically been a very time consuming, tedious and error prone task. Several man-years of effort may be required to build the station displays for a large interconnected power system. Once these stations displays have bee...

2003-05-07T23:59:59.000Z

335

WWVB Station Library  

Science Conference Proceedings (OSTI)

... NIST time and frequency broadcast stations. ... International Conference, Washington, DC, August 2001. WWVB Improvements: New Power from an ...

2010-10-05T23:59:59.000Z

336

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

337

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

338

New York Nuclear Profile - Nine Mile Point Nuclear Station  

U.S. Energy Information Administration (EIA) Indexed Site

Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

339

CX-008206: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Block Grant - Charlotte-Mecklenburg Police Department Parking Deck Electric Vehicle Charging Station CX(s) Applied: B5.23 Date: 03262012 Location(s): North Carolina...

340

2013 Washington Auto Show | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the convenience of owning an electric vehicle by expanding consumer access to charging stations. | Photo courtesy of Sarah Gerrity, Energy Department. Date taken: 2013-01-31...

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 4790 of 31,917 results. 81 - 4790 of 31,917 results. Download EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan Guarantee to Cogentrix of Alamosa, LLC for Construction of the Cogentrix Solar Project Near Alamosa, Colorado http://energy.gov/nepa/downloads/ea-1839-final-environmental-assessment-and-finding-no-significant-impact Download EA-1503: Final Environmental Assessment Vermont Electric Power Company Proposed Northern Loop Project http://energy.gov/nepa/downloads/ea-1503-final-environmental-assessment Download Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia http://energy.gov/oe/downloads/special-environmental-analysis-actions-taken-under-us-department-energy-emergency

342

Stations in Special Wind Regions  

Science Conference Proceedings (OSTI)

Stations in Special Wind Regions. ... station_matrix_912850.xlsx (Excel file). [ SED Home | Extreme Winds Home | Previous | Next ] ...

2013-03-11T23:59:59.000Z

343

Guideline for Communication at Generating Stations  

Science Conference Proceedings (OSTI)

Implementing high standards for communications in fossil power plants has been an effective way to reduce operator errors and improve plant availability. Poor communication practices have led to plant trips, equipment damage, and inefficient use of resources. Effective plant communication can be implemented without using significant resources. As part of a series of conduct of operations reports that provide detailed guidance for fossil plant operators, this communication standards and equipment report s...

2011-12-16T23:59:59.000Z

344

LIMERICK GENERATING STATION- NRC INTEGRATED INSPECTION  

E-Print Network (OSTI)

Units 1 and 2. The enclosed report documents the inspection findings which were discussed on October 4, 2002, with Mr. W. Levis and other members of your staff. This inspection examined activities conducted under your license as they relate to safety and compliance with the Commission’s rules and regulations and with the conditions of your license. The inspectors reviewed procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, the inspectors identified four issues of very low safety significance (Green). Two of these issues were determined to involve violations of NRC requirements. However, because of their very low safety significance and because they have been entered into your corrective action program, the NRC is treating these issues as Non-Cited Violations, in accordance with Section VI.A.1 of the NRC’s Enforcement Policy. If you deny these non-cited violations, you should provide a response with the basis for your denial, within 30 days of the date of this inspection report, to the Nuclear Regulatory Commission,

Exelon Nuclear

2002-01-01T23:59:59.000Z

345

Early Station Costs Questionnaire  

NLE Websites -- All DOE Office Websites (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

346

Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documenting Department of Energy Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter documenting Department of Energy receipt of the Mirant Potomac River compliance plan, and informing Mirant that additional comments on the plan would be forthcoming. Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Motion for Leave to Answer and Answer of Potomac Electric Power Company

347

Department of Energy Emergency Order No. 202-06-01 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Order No. 202-06-01 Emergency Order No. 202-06-01 Department of Energy Emergency Order No. 202-06-01 Docket No. EO-05-01. Order No. 202-06-01: On December 20,2005, I issued Department of Energy (DOE) Order No. 202-05-3. On January 19,2006, David K. Paylor, Director of the Commonwealth of Virginia's Department of Environmental Quality, and the City of Alexandria, Virginia submitted requests for rehearing of Order No. 202-05-3 concerning the Mirant Potomac River Generating Station. Also on January 19,2006, the District of Columbia Public Service Commission submitted a request for clarification or, in the alternative, rehearing of Order No. 202-05-3. The rehearing requests were submitted pursuant to section 3 13 of the Federal Power Act, 16 U.S.C. 8251. In order to afford additional time for consideration of the matters raised

348

Department of Energy Order No. 202-07-02 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02 02 Department of Energy Order No. 202-07-02 Docket No. EO-05-01. Order No. 202-07-02: I find that the circumstances which led to my previous determination that the Central D.C. area was experiencing a shortage of electric energy continue, andtherefore I hereby extend Order No. 202-05-3, as herein amended, until 12:01 a.m., July1, 2007. The Ordering Paragraphs of Order No. 202-05-3 are hereby amended by replacing them in their entirety and inserting the Ordering Paragraphs contained in section IV below. Department of Energy Order No. 202-07-02 More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Comments and Amended Request for Extension of Order No. 202-05-3 of the

349

Investigation Letter Report: I11IG002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Letter Report: I11IG002 Letter Report: I11IG002 Investigation Letter Report: I11IG002 August 17, 2011 Impact of Copper Thefts on the Department of Energy A series of news articles during the last several months have reported increased thefts of copper nationally, including several that have interrupted electrical distribution and telephone service in communities across the country. The Department of Energy's laboratories, environmental remediation sites, generating stations and other facilities have not been immune to this problem. Over the last few years, the Office of Inspector General (OIG) has successfully investigated numerous reports of copper thefts from Department sites nationwide. The OIG believes that there are several practical, cost-effective steps that the Department can

350

City of Alexandria, Virginia Comments Regarding Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Alexandria, Virginia Comments Regarding Department of City of Alexandria, Virginia Comments Regarding Department of Energy Emergency Order, Operating Plan by Mirant and Proposed Special Environmental Analysis City of Alexandria, Virginia Comments Regarding Department of Energy Emergency Order, Operating Plan by Mirant and Proposed Special Environmental Analysis Docket No. EO-05-01: The City of Alexandria, Virginia ("Alexandria") hereby submits the following comments in response to the notice of emergency action published in the Federal Register on January 20, 2006 by the U.S. Department of Energy ("DOE") entitled "Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, V A, in Response to Electricity Reliability Concerns in Washington, D.C." (71 Fed.

351

Department of Energy Response to Correspondence from Mary Celeste Harris  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mary Celeste Mary Celeste Harris Related to District of Columbia Public Service Commission Docket No. EO-05-01 Department of Energy Response to Correspondence from Mary Celeste Harris Related to District of Columbia Public Service Commission Docket No. EO-05-01 Docket No. EO-05-01: Department of Energy response to correspondence from Mary Celeste Harris related to District of Columbia Public Service Commission Docket No. EO-05-01 regarding operation of Mirnat Corporation's Potomac River Generating Station. Department of Energy Response to Correspondence from Mary Celeste Harris Related to District of Columbia Public Service Commission Docket No. EO-05-01 More Documents & Publications Department of Energy Response to Correspondence from Alexandria Homeowners and Citizens Associations Related to District of Columbia Public Service

352

Rhode Island | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 19, 2010 CX-000940: Categorical Exclusion Determination Distributed Generation Wind Power at Navy Sites - Second Meteorological tower at Naval Station Newport, Rhode...

353

Renewable Electricity Generation (Fact Sheet), Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy (DOE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

renewable energy companies compete in a rapidly renewable energy companies compete in a rapidly growing, highly competitive global market worth hundreds of billions of dollars per year[7], a market projected to grow to $460 billion per year by 2030[1]. Due in part to a highly skilled workforce and a growing energy education system, American businesses, workers, and their communities are uniquely positioned to take advantage of this opportunity. Our nation has abundant solar, water, wind, and geothermal energy resources, and many U.S. companies are developing, manufacturing, and installing cutting edge, high-tech renewable energy systems. The Office of Energy Efficiency and Renewable Energy (EERE), part of the U.S. Department of Energy (DOE), plays a key role in advancing America's "all of the

354

Timber Mountain Precipitation Monitoring Station  

SciTech Connect

A precipitation monitoring station was placed on the west flank of Timber Mountain during the year 2010. It is located in an isolated highland area near the western border of the Nevada National Security Site (NNSS), south of Pahute Mesa. The cost of the equipment, permitting, and installation was provided by the Environmental Monitoring Systems Initiative (EMSI) project. Data collection, analysis, and maintenance of the station during fiscal year 2011 was funded by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office Environmental Restoration, Soils Activity. The station is located near the western headwaters of Forty Mile Wash on the Nevada Test and Training Range (NTTR). Overland flows from precipitation events that occur in the Timber Mountain high elevation area cross several of the contaminated Soils project CAU (Corrective Action Unit) sites located in the Forty Mile Wash watershed. Rain-on-snow events in the early winter and spring around Timber Mountain have contributed to several significant flow events in Forty Mile Wash. The data from the new precipitation gauge at Timber Mountain will provide important information for determining runoff response to precipitation events in this area of the NNSS. Timber Mountain is also a groundwater recharge area, and estimation of recharge from precipitation was important for the EMSI project in determining groundwater flowpaths and designing effective groundwater monitoring for Yucca Mountain. Recharge estimation additionally provides benefit to the Underground Test Area Sub-project analysis of groundwater flow direction and velocity from nuclear test areas on Pahute Mesa. Additionally, this site provides data that has been used during wild fire events and provided a singular monitoring location of the extreme precipitation events during December 2010 (see data section for more details). This letter report provides a summary of the site location, equipment, and data collected in fiscal year 2011.

Lyles Brad,McCurdy Greg,Chapman Jenny,Miller Julianne

2012-01-01T23:59:59.000Z

355

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 11830 of 26,764 results. 21 - 11830 of 26,764 results. Download Supplemental Comments on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station http://energy.gov/oe/downloads/supplemental-comments-department-energy-s-emergency-order-resume-operation-mirant-s Download CX-009180: Categorical Exclusion Determination (0675-1526) Gayle Technologies, Inc. (GTI) - State-of-Health by Ultrasonic Battery Monitoring with In-Service Testing CX(s) Applied: B3.6 Date: 09/06/2012 Location(s): Tennessee, Oklahoma, Tennessee Offices(s): Advanced Research Projects Agency-Energy http://energy.gov/nepa/downloads/cx-009180-categorical-exclusion-determination Article Secretary Chu Announces Latest Efforts to Address Cybersecurity DOE releases 2010 U.S. Smart Grid Vendor Ecosystem Report

356

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 4630 of 31,917 results. 21 - 4630 of 31,917 results. Download Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan http://energy.gov/oe/downloads/comments-department-energy-s-emergency-order-resume-limited-operation-mirant-s-potomac Download Fossil Energy Today- Third Quarter, 2012 Here are just some of the stories featured in this issue: DOE Announces New Carbon Storage Mapping Initiative; Carbon Capture Technology Wins R&D 100 Award; Director of NETL Talks Science Strategy http://energy.gov/fe/downloads/fossil-energy-today-third-quarter-2012 Download CX-001932: Categorical Exclusion Determination Laramie County Community College Utility-Scale Wind Energy Technology

357

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 23720 of 26,764 results. 11 - 23720 of 26,764 results. Download Attachment FY2011-55 OPAM http://energy.gov/management/downloads/attachment-fy2011-55-opam Download PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia http://energy.gov/oe/downloads/pepco-comments-special-environmental-analysis-actions-taken-under-us-department-energy Download Minnesota's Governor Tim Pawlenty's Governor's Assurance Certification http://energy.gov/downloads/minnesotas-governor-tim-pawlentys-governors-assurance-certification Download http://energy.gov/node/240835 Download DOE Supplemental Instructions for OMB Section 1512 Reporting - For Contractors http://energy.gov/downloads/doe-supplemental-instructions-omb-section-1512-reporting-contractors

358

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 9930 of 31,917 results. 21 - 9930 of 31,917 results. Download Update 3 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Units 1 and 4 Together Docket No. EO-05-01. Docket No. EO-05-01. This report describes dispersion modeling performed for Units 1 and 4 at Mirant's Potomac River Generating Station. The purpose of the modeling was to... http://energy.gov/oe/downloads/update-3-dispersion-modeling-analysis-downwash-mirants-potomac-river-power-plant Download City of Alexandria, Virginia Comments Regarding Department of Energy Emergency Order, Operating Plan by Mirant and Proposed Special Environmental Analysis http://energy.gov/oe/downloads/city-alexandria-virginia-comments-regarding-department-energy-emergency-order-operating Download Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor

359

The Village Base Station Kurtis Heimerl  

E-Print Network (OSTI)

deployment due to low power requirements that enable local generation via solar or wind; · explicit support. At around 20W, its power consumption is low enough to avoid diesel genera- tors and the corresponding damaging equipment [2]. We propose operating the entire base station on solely wind or solar power, which

California at Berkeley, University of

360

Connecticut Company to Advance Hydrogen Infrastructure and Fueling Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Connecticut Company to Advance Hydrogen Infrastructure and Fueling Connecticut Company to Advance Hydrogen Infrastructure and Fueling Station Technologies Connecticut Company to Advance Hydrogen Infrastructure and Fueling Station Technologies July 18, 2012 - 3:36pm Addthis As part of the U.S. Energy Department's commitment to give American businesses more options to cut energy costs and reduce reliance on imported oil, the Department today announced a $1.4 million investment to Wallingford- based Proton Energy Systems to collect and analyze performance data for hydrogen fueling stations and advanced refueling components. The projects will also help to track the performance and technical progress of innovative refueling systems to find ways to lower costs and improve operation. These investments are part of the Department's broader strategy

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Mirant Potomac River: DOE Case OE-05-01 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River: DOE Case OE-05-01 River: DOE Case OE-05-01 Mirant Potomac River: DOE Case OE-05-01 Written presentation of information regarding the Potomac River power plant that Mirant shared with DOE, PEPCO and PJM at a meeting called by DOE on September 1, 2005. Mirant Potomac River: DOE Case OE-05-01 More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Notice of Emergency Action - Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC: Federal Register Notice Volume 71, No. 13 - Jan. 20, 2006 Special Environmental Analysis For Actions Taken under U.S. Department of

362

SEA-04: Special Environmental Analysis | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

SEA-04: Special Environmental Analysis SEA-04: Special Environmental Analysis SEA-04: Special Environmental Analysis Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia On December 20, 2005, the Secretary of Energy issued an emergency order, DOE Order 202-05-03, requiring Mirant's Potomac River Generating Station in Alexandria, Virginia, to operate under limited circumstances. On September 28, 2006, the Secretary extended the Order, including all of its terms and conditions, DOE Order 202-06-2, until December 1, 2006. This SEA includes descriptions of the DOE emergency orders; assessments of the direct, indirect, and cumulative impacts resulting from the emergency orders; and descriptions of alternative actions for potential future

363

EA-1620: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact EA-1620: Finding of No Significant Impact Burbank Hydrogen Fueling Station Project, CA The Department of Energy, in coordination with the City of...

364

Plug-In Electric Vehicle Handbook for Public Charging Station Hosts (Brochure), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Public Charging Public Charging Station Hosts Plug-In Electric Vehicle Handbook for Public Charging Station Hosts 2 Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . 3 PEV Basics . . . . . . . . . . . . . . . . . . . . . . . . . 4 Charging Basics . . . . . . . . . . . . . . . . . . . . . 6 Benefits and Costs of Hosting a Charging Station . . . . . . . . . . . 9 Charging Station Locations and Hosts . . . . . . . . . . . . . . . . . 12 Ownership and Payment Models . . . . . . 14 Installing and Maintaining Charging Stations . . . . . . . . . . . . . . . . . . . 15 Electrifying the Future . . . . . . . . . . . . . . 19 Clean Cities Helps Establish PEV Charging Stations Establishing plug-in electric vehicle (PEV) charging stations requires unique knowledge and skills . If you need help, contact your local Clean Cities coordinator . Clean Cities is the U .S . Department of Energy's flagship alterna- tive-transportation deployment initiative . It is supported

365

Tennessee Valley Authority Smart Modal Area Recharge Terminal (SMART) Station Project  

Science Conference Proceedings (OSTI)

EPRI and the Tennessee Valley Authority (TVA) collaborated to design and build solar-assisted electric vehicle (EV) charging stations, referred to as a TVA Smart Modal Area Recharge Terminal, or TVA SMART Station. These stations—which combine photovoltaic generation, EV charging, and stationary battery storage—have been deployed across the State of Tennessee. In specific, the five deployed stations provide a total of 72 kW of solar generation capacity, 36 parking spaces equipped for ...

2012-11-12T23:59:59.000Z

366

Radio Interference From HVDC Converter Stations, Modeling and Characterization  

Science Conference Proceedings (OSTI)

High-voltage direct-current converter stations generate electromagnetic interference (EMI) that can affect the performance of nearby electronic equipment. A prototype computer program that calculates EMI characteristics in the 5-500-kHz range will enable utility engineers to determine the extent of such interference during the design stage of a converter station.

1986-12-16T23:59:59.000Z

367

Next Generation Radioisotope Generators | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

power system assembly glovebox at INL. Continue to support development of the Nuclear Cyrogenic Propulsion Stage (Nuclear Thermal Rocket) with NASA's Marshall Space Flight Center....

368

Department of Energy Response to Correspondence from Alexandria Homeowners  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alexandria Alexandria Homeowners and Citizens Associations Related to District of Columbia Public Service Commission Docket No. EO-05-01 Department of Energy Response to Correspondence from Alexandria Homeowners and Citizens Associations Related to District of Columbia Public Service Commission Docket No. EO-05-01 Docket No. EO-05-01: Department of Energy response to correspondence from Alexandria Homeowners and Citizens Associations related to District of Columbia Public Service Commission Docket No. EO-05-01 regarding operation of Mirnat Corporation's Potomac River Generating Station. Department of Energy Response to Correspondence from Alexandria Homeowners and Citizens Associations Related to District of Columbia Public Service Commission Docket No. EO-05-01 More Documents & Publications

369

Mobile Alternative Fueling Station Locator  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fueling Station Locator Alternative Fueling Station Locator Fuel Type Biodiesel (B20 and above) Compressed Natural Gas Electric Ethanol (E85) Hydrogen Liquefied Natural Gas (LNG) Liquefied Petroleum Gas (Propane) Location Enter a city, postal code, or address Include private stations Not all stations are open to the public. Choose this option to also search private fueling stations. Search Caution: The AFDC recommends that users verify that stations are open, available to the public, and have the fuel prior to making a trip to that location. Some stations in our database have addresses that could not be located by the Station Locator application. This may result in the station appearing in the center of the zip code area instead of the actual location. If you're having difficulty, please contact the technical response team at

370

A computer program for HVDC converter station RF noise calculations  

SciTech Connect

HVDC converter station operations generate radio frequency (RF) electromagnetic (EM) noise which could interfere with adjacent communication and computer equipment, and carrier system operations. A generic Radio Frequency Computer Analysis Program (RAFCAP) for calculating the EM noise generated by valve ignition of a converter station has been developed as part of a larger project. The program calculates RF voltages, currents, complex power, ground level electric field strength and magnetic flux density in and around an HVDC converter station. The program requires the converter station network to be represented by frequency dependent impedance functions. Comparisons of calculated and measured values are given for an actual HVDC station to illustrate the validity of the program. RAFCAP is designed to be used by engineers for the purpose of calculating the RF noise produced by the igniting of HVDC converter valves.

Kasten, D.G.; Caldecott, R.; Sebo, S.A. (Ohio State Univ., Columbus, OH (United States). Dept. of Electrical Engineering); Liu, Y. (Virginia Polytechnic Inst. State Univ., Blacksburg, VA (United States). Bradley Dept. of Electrical Engineering)

1994-04-01T23:59:59.000Z

371

Analysis of accident sequences and source terms at treatment and storage facilities for waste generated by US Department of Energy waste management operations  

SciTech Connect

This report documents the methodology, computational framework, and results of facility accident analyses performed for the US Department of Energy (DOE) Waste Management Programmatic Environmental Impact Statement (WM PEIS). The accident sequences potentially important to human health risk are specified, their frequencies assessed, and the resultant radiological and chemical source terms evaluated. A personal-computer-based computational framework and database have been developed that provide these results as input to the WM PEIS for the calculation of human health risk impacts. The WM PEIS addresses management of five waste streams in the DOE complex: low-level waste (LLW), hazardous waste (HW), high-level waste (HLW), low-level mixed waste (LLMW), and transuranic waste (TRUW). Currently projected waste generation rates, storage inventories, and treatment process throughputs have been calculated for each of the waste streams. This report summarizes the accident analyses and aggregates the key results for each of the waste streams. Source terms are estimated, and results are presented for each of the major DOE sites and facilities by WM PEIS alternative for each waste stream. Key assumptions in the development of the source terms are identified. The appendices identify the potential atmospheric release of each toxic chemical or radionuclide for each accident scenario studied. They also discuss specific accident analysis data and guidance used or consulted in this report.

Mueller, C.; Nabelssi, B.; Roglans-Ribas, J.; Folga, S.; Policastro, A.; Freeman, W.; Jackson, R.; Mishima, J.; Turner, S.

1996-12-01T23:59:59.000Z

372

Hydrogen Filling Station  

SciTech Connect

Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen future. Project partners also conducted a workshop on hydrogen safety and permitting. This provided an opportunity for the various permitting agencies and end users to gather to share experiences and knowledge. As a result of this workshop, the permitting process for the hydrogen filling station on the Las Vegas Valley Water District’s land was done more efficiently and those who would be responsible for the operation were better educated on the safety and reliability of hydrogen production and storage. The lessons learned in permitting the filling station and conducting this workshop provided a basis for future hydrogen projects in the region. Continuing efforts to increase the working pressure of electrolysis and efficiency have been pursued. Research was also performed on improving the cost, efficiency and durability of Proton Exchange Membrane (PEM) hydrogen technology. Research elements focused upon PEM membranes, electrodes/catalysts, membrane-electrode assemblies, seals, bipolar plates, utilization of renewable power, reliability issues, scale, and advanced conversion topics. Additionally, direct solar-to-hydrogen conversion research to demonstrate stable and efficient photoelectrochemistry (PEC) hydrogen production systems based on a number of optional concepts was performed. Candidate PEC concepts included technical obstacles such as inefficient photocatalysis, inadequate photocurrent due to non-optimal material band gap energies, rapid electron-hole recombination, reduced hole mobility and diminished operational lifetimes of surface materials exposed to electrolytes. Project Objective 1: Design, build, operate hydrogen filling station Project Objective 2: Perform research and development for utilizing solar technologies on the hydrogen filling station and convert two utility vehicles for use by the station operators Project Objective 3: Increase capacity of hydrogen filling station; add additional vehicle; conduct safety workshop; develop a roadmap for hydrogen development; accelerate the development of photovoltaic components Project Objective 4:

Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

2010-02-24T23:59:59.000Z

373

Hydrogen Filling Station  

Science Conference Proceedings (OSTI)

Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen future. Project partners also conducted a workshop on hydrogen safety and permitting. This provided an opportunity for the various permitting agencies and end users to gather to share experiences and knowledge. As a result of this workshop, the permitting process for the hydrogen filling station on the Las Vegas Valley Water District’s land was done more efficiently and those who would be responsible for the operation were better educated on the safety and reliability of hydrogen production and storage. The lessons learned in permitting the filling station and conducting this workshop provided a basis for future hydrogen projects in the region. Continuing efforts to increase the working pressure of electrolysis and efficiency have been pursued. Research was also performed on improving the cost, efficiency and durability of Proton Exchange Membrane (PEM) hydrogen technology. Research elements focused upon PEM membranes, electrodes/catalysts, membrane-electrode assemblies, seals, bipolar plates, utilization of renewable power, reliability issues, scale, and advanced conversion topics. Additionally, direct solar-to-hydrogen conversion research to demonstrate stable and efficient photoelectrochemistry (PEC) hydrogen production systems based on a number of optional concepts was performed. Candidate PEC concepts included technical obstacles such as inefficient photocatalysis, inadequate photocurrent due to non-optimal material band gap energies, rapid electron-hole recombination, reduced hole mobility and diminished operational lifetimes of surface materials exposed to electrolytes. Project Objective 1: Design, build, operate hydrogen filling station Project Objective 2: Perform research and development for utilizing solar technologies on the hydrogen filling station and convert two utility vehicles for use by the station operators Project Objective 3: Increase capacity of hydrogen filling station; add additional vehicle; conduct safety workshop; develop a roadmap for hydrogen development; accelerate the development of photovoltaic components Project Objective 4:

Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

2010-02-24T23:59:59.000Z

374

Analysis of operating alternatives for the Naval Computer and Telecommunications Station Cogeneration Facility at Naval Air Station North Island, San Diego, California  

SciTech Connect

The Naval Facilities Engineering Command Southwestern Division commissioned Pacific Northwest Laboratory (PNL), in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to determine the most cost-effective approach to the operation of the cogeneration facility in the Naval Computer and Telecommunications Station (NCTS) at the Naval Air Station North Island (NASNI). Nineteen alternative scenarios were analyzed by PNL on a life-cycle cost basis to determine whether to continue operating the cogeneration facility or convert the plant to emergency-generator status. This report provides the results of the analysis performed by PNL for the 19 alternative scenarios. A narrative description of each scenario is provided, including information on the prime mover, electrical generating efficiency, thermal recovery efficiency, operational labor, and backup energy strategy. Descriptions of the energy and energy cost analysis, operations and maintenance (O&M) costs, emissions and related costs, and implementation costs are also provided for each alternative. A summary table presents the operational cost of each scenario and presents the result of the life-cycle cost analysis.

Parker, S.A.; Carroll, D.M.; McMordie, K.L.; Brown, D.R.; Daellenbach, K.K.; Shankle, S.A.; Stucky, D.J.

1993-12-01T23:59:59.000Z

375

Quantitative Analysis of Station Hydrogen  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of Station Analysis of Station Hydrogen * Role of ENAA (Engineering Advancement Association of Japan) - To manage the construction and operation of hydrogen stations in national project, JHFC Project - To act as secretariat of ISO/TC197 (Hydrogen technologies) committee of Japan Kazuo Koseki Chief Secretary of ISO/TC197 of Japan ENAA Yokohama Daikoku Station (Desulfurized Gasoline) Yokohama Asahi Station (Naphtha) Senju Station (LPG) Kawasaki Station (Methanol) Yokohama Asahi Station Naphtha PSA Compressor Storage Tanks Dispenser Reformer Buffer Tank 25 MPa 35 MPa 1073 K 0.8 MPa Inlet : 0.6 MPa Outlet : 40 MPa Vent Stack 40 MPa Result of Quantitative Analysis Concentration. vol.ppm Min.Detect Analysis Impurity Gasoline Naphtha LPG Methanol Conc. Method CO 0.05 0.06 0.02 0.06 0.01 GC-FID

376

Final MTI Data Report: Pilgrim Nuclear Station  

Science Conference Proceedings (OSTI)

During the period from May 2000 to September 2001, ocean surface water temperature data was collected at the Pilgrim Nuclear Power Station near Plymouth, MA. This effort was led by the Savannah River Technology Center (SRTC) with the assistance of a local sub-contractor, Marine BioControl Corporation of Sandwich, MA. Permission for setting up the monitoring system was granted by Energy Corporation, which owns the plant site. This work was done in support of SRTC's ground truth mission for the U.S. Department of Energy's Multispectral Thermal Imager (MTI) satellite.

Parker, M.J.

2003-03-17T23:59:59.000Z

377

Fuel Station of the Future- Innovative Approach to Fuel Cell Technology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Station of the Future- Innovative Approach to Fuel Cell Station of the Future- Innovative Approach to Fuel Cell Technology Unveiled in California Fuel Station of the Future- Innovative Approach to Fuel Cell Technology Unveiled in California September 15, 2011 - 5:51pm Addthis A customer fills up at a new Energy Department supported fuel cell hydrogen energy station in Fountain Valley, California. | Photo courtesy of Air Products and Chemicals. A customer fills up at a new Energy Department supported fuel cell hydrogen energy station in Fountain Valley, California. | Photo courtesy of Air Products and Chemicals. Sunita Satyapal Program Manager, Hydrogen & Fuel Cell Technology Program Imagine pulling-up to a fuel station that supplies your car with clean, renewable fuel. Now imagine that, while you're filling up, this same

378

NREL: Technology Deployment - NREL's Federal Fueling Station Data Supports  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL's Federal Fueling Station Data Supports Superstorm Sandy Recovery NREL's Federal Fueling Station Data Supports Superstorm Sandy Recovery January 22, 2013 In the aftermath of Superstorm Sandy, millions of Americans remained without electricity as emergency responders, security officials, and regular citizens all experienced a lack of access to vehicle fuels. As fuel shortages spread and lines grew at the few fueling stations that had electricity, officials from General Services Administration (GSA) Fleet and the U.S. Department of Homeland Security's (DHS) National Protection and Programs Directorate contacted the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) hoping to locate additional fuel provisions from private and federal facilities. FEMP then tapped NREL to provide data on the locations of federally owned fueling infrastructure in

379

TEC Meeting Summaries - April 2005 Presentations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2005 Presentations April 2005 Presentations TEC Meeting Summaries - April 2005 Presentations Phoenix, Arizona Presentations (April 2005) Documents Available for Download Plenary I - United States Naval Nuclear Propulsion Program Plenary I - National Academies Update Plenary I - Transportation Resources Exchange Center Plenary I - Transportation Communications Plenary II - San Onofre Nuclear Generating Station Plenary II - Yucca Mountain Transportation Plenary II - Main Yankee Reactor Vessel Removal & Barge Transport Plenary III - Accomplishments and Future Topic Group Summaries - TEC Rail Topic Group Summary Topic Group Summaries - Section 180(c) Group Update Topic Group Summaries - Security Topic Group Update Topic Group Summaries - Tribal Topic Group Update Program Updates - Department of Energy Environmental Management

380

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Docket No. EO-05-01: Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor, March 2002 to November 2004, showing the model overprediction Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CX-007828: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency and Conservation Block Grant Program. Maricopa is funding the design and engineering W04'k on an energy efficient, "green" fire station. U.S. Department of Energy...

382

CX-007111: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-007111: Categorical Exclusion Determination Shallow Carbon Sequestration Demonstration Project (Iatan Generating Station) CX(s) Applied: B3.1...

383

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Download Comments on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. http:...

384

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan http:energy.govoedownloads...

385

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

results. Download CX-000940: Categorical Exclusion Determination Distributed Generation Wind Power at Navy Sites - Second Meteorological tower at Naval Station Newport, Rhode...

386

CX-003627: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-003627: Categorical Exclusion Determination Chenoweth Substation Third Generation (3G) Radio Station Project CX(s) Applied: B1.19 Date: 08092010...

387

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences Laboratory CX(s) Applied: B1.15 Date: 09302009 Location(s): Richland,...

388

CX-008544: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination CX-008544: Categorical Exclusion Determination Hydrogen Generation and Fueling Station on the South Table Mountain Campus CX(s) Applied:...

389

Notice of Unplanned Outage at the Mirant Potomac River Plant | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unplanned Outage at the Mirant Potomac River Plant Unplanned Outage at the Mirant Potomac River Plant Notice of Unplanned Outage at the Mirant Potomac River Plant Docket No. EO-05-01. Order No. 202-05-03: Pursuant to the United States Department of Energy ("DOE") Order No_ 202-05-3, issued December 20, 2005 ("DOE Potomac River Order"), Pepco hereby files this notice of an unplanned outage of one of the 230kV circuits serving the Potomac River Substation, and through that station, the District of Columbia. Notice of Unplanned Outage at the Mirant Potomac River Plant More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Further Notice of 230kV Circuit Planned Outages

390

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

391

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

392

NREL: News - NREL Developed Mobile App for Alternative Fueling Station  

NLE Websites -- All DOE Office Websites (Extended Search)

713 713 NREL Developed Mobile App for Alternative Fueling Station Locations Released New application for iPhone helps users find stations offering electricity, biodiesel, natural gas, and other alternative fuels. November 7, 2013 iPhone users now have access to a free application that locates fueling stations offering alternative fuels, including electricity, natural gas, biodiesel, e85 Ethanol, propane and hydrogen. The Energy Department's (DOE) National Renewable Energy Laboratory (NREL) developed the new mobile application for DOE's Clean Cities program. Clean Cities supports local stakeholders across the country in an effort to cut petroleum use in transportation. The Alternative Fueling Station Locator App, now available through Apple's App Store, allows iPhone users to select an alternative fuel and

393

High speed imager test station  

DOE Patents (OSTI)

A test station enables the performance of a solid state imager (herein called a focal plane array or FPA) to be determined at high image frame rates. A programmable waveform generator is adapted to generate clock pulses at determinable rates for clock light-induced charges from a FPA. The FPA is mounted on an imager header board for placing the imager in operable proximity to level shifters for receiving the clock pulses and outputting pulses effective to clock charge from the pixels forming the FPA. Each of the clock level shifters is driven by leading and trailing edge portions of the clock pulses to reduce power dissipation in the FPA. Analog circuits receive output charge pulses clocked from the FPA pixels. The analog circuits condition the charge pulses to cancel noise in the pulses and to determine and hold a peak value of the charge for digitizing. A high speed digitizer receives the peak signal value and outputs a digital representation of each one of the charge pulses. A video system then displays an image associated with the digital representation of the output charge pulses clocked from the FPA. In one embodiment, the FPA image is formatted to a standard video format for display on conventional video equipment. 12 figs.

Yates, G.J.; Albright, K.L.; Turko, B.T.

1995-11-14T23:59:59.000Z

394

High speed imager test station  

DOE Patents (OSTI)

A test station enables the performance of a solid state imager (herein called a focal plane array or FPA) to be determined at high image frame rates. A programmable waveform generator is adapted to generate clock pulses at determinable rates for clock light-induced charges from a FPA. The FPA is mounted on an imager header board for placing the imager in operable proximity to level shifters for receiving the clock pulses and outputting pulses effective to clock charge from the pixels forming the FPA. Each of the clock level shifters is driven by leading and trailing edge portions of the clock pulses to reduce power dissipation in the FPA. Analog circuits receive output charge pulses clocked from the FPA pixels. The analog circuits condition the charge pulses to cancel noise in the pulses and to determine and hold a peak value of the charge for digitizing. A high speed digitizer receives the peak signal value and outputs a digital representation of each one of the charge pulses. A video system then displays an image associated with the digital representation of the output charge pulses clocked from the FPA. In one embodiment, the FPA image is formatted to a standard video format for display on conventional video equipment.

Yates, George J. (Santa Fe, NM); Albright, Kevin L. (Los Alamos, NM); Turko, Bojan T. (Moraga, CA)

1995-01-01T23:59:59.000Z

395

International Space Station Again  

E-Print Network (OSTI)

For the fifth time in 2 1/2 years, the International Space Station (ISS) had to execute a collision avoidance maneuver in early April to ensure a safe miss distance for a piece of orbital debris. As solar activity increases during the next few years, the frequency of ISS collision avoidance might increase as many hundreds of resident space objects drift down through the ISS orbital regime. The subject of concern in late March 2011 was a fragment from Cosmos 2251, the Russian communications satellite which had accidentally collided with the U.S. Iridium 33 communications satellite in February 2009, producing more than

Iss Airlock Shields; A Note On Active; A Publication Of

2011-01-01T23:59:59.000Z

396

Arizona Public Service Co., Palo Verde Nuclear Generating ...  

Science Conference Proceedings (OSTI)

Arizona Public Service Co., Palo Verde Nuclear Generating Station. NVLAP Lab Code: 100536-0. Address and Contact Information: ...

2013-08-23T23:59:59.000Z

397

EERE Blog | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2013 18, 2013 Deputy Assistant Secretary for Renewable Energy Steven Chalk speaks during the American Wind Energy Association WINDPOWER Offshore conference in Providence, Rhode Island. | Photo courtesy of American Wind Energy Association Overcoming Challenges in America's Offshore Wind Industry A year of progress, preparation and promise was the theme connecting two days of panels and presentations last month at the 2013 American Wind Energy Association WINDPOWER Offshore conference in Providence, Rhode Island. November 15, 2013 The Alternative Fueling Station Locator iPhone app helps you find fueling stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department Alternative Fueling Station Locator App Provides Info at Your Fingertips

398

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Electrical Generating Equipment Indiana Commercial Industrial Residential Bioenergy Water Buying & Making Electricity Solar Home Weatherization Wind Indiana Department...

399

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network (OSTI)

to the natural gas reformer station. Station 4: On-sitereforming of natural gas at the station b. MeOH 100 (case 3)cost of natural gas at the station is much lower (roughly

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

400

Hydrogen refueling station costs in Shanghai  

E-Print Network (OSTI)

to the natural gas reformer station. Station 4. On-siteSMR 300) use natural gas at the station; Case 3 (MeOH 100)reforming of natural gas at the station. 100 (case 3) =

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Geothermal energy at Long Beach Naval Shipyard and Naval Station and at Seal Beach Naval Weapons Station, California. Final report  

DOE Green Energy (OSTI)

The purpose of this project was to determine and evaluate sources of geothermal energy at two military bases in southern California, the Long Beach Naval Shipyard and Naval Station and the Seal Beach Naval Weapons Station. One part of the project focused on the natural geothermal characteristics beneath the naval bases. Another part focused on the geothermal energy produced by oilfield operations on and adjacent to each base. Results of the study are presented here for the US Department of the Navy to use in its program to reduce its reliance on petrolem by the development of different sources of energy. The study was accomplished under a cooperative agreement between the US Department of Energy's San Francisco Operations Office and the Department of the Navy's Naval Weapons Center, China Lake, California, for joint research and development of geothermal energy at military installations.

Higgins, C.T.; Chapman, R.H.

1984-01-01T23:59:59.000Z

402

Grants | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Property » Grants Services » Property » Grants Grants Community Assistance Grants August 28, 2002 Department of Energy Awards $485,000 Grant to the Southern Ohio Diversification Initiative Community Reuse Organization Department of Energy Awards $485,000 Grant to the Southern Ohio Diversification Initiative Community Reuse Organization August 22, 2002 Energy Department Awards $1.4 Million Grant to the Community Reuse Organization of East Tennessee Energy Department Awards $1.4 Million Grant to the Community Reuse Organization of East Tennessee August 22, 2002 Department of Energy Awards $1.1 Million to Paducah Area Community Reuse Organization Department of Energy Awards $1.1 Million to Paducah Area Community Reuse Organization July 30, 2002 Department of Energy Awards $300,000 to Albuquerque's Next Generation

403

Alternative Fuels Data Center: Ethanol Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fueling Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Ethanol Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Ethanol Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Ethanol Fueling Stations on Google Bookmark Alternative Fuels Data Center: Ethanol Fueling Stations on Delicious Rank Alternative Fuels Data Center: Ethanol Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Ethanol Fueling Stations on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Ethanol Fueling Stations Photo of an ethanol fueling station. Thousands of ethanol fueling stations are available in the United States.

404

Alternative Fuels Data Center: Hydrogen Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fueling Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Hydrogen Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Hydrogen Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Hydrogen Fueling Stations on Google Bookmark Alternative Fuels Data Center: Hydrogen Fueling Stations on Delicious Rank Alternative Fuels Data Center: Hydrogen Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Hydrogen Fueling Stations on AddThis.com... More in this section... Hydrogen Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Hydrogen Fueling Stations Photo of a hydrogen fueling station. A handful of hydrogen fueling stations are available in the United States

405

Alternative Fuels Data Center: Biodiesel Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fueling Fueling Stations to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Fueling Stations on Google Bookmark Alternative Fuels Data Center: Biodiesel Fueling Stations on Delicious Rank Alternative Fuels Data Center: Biodiesel Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Fueling Stations on AddThis.com... More in this section... Biodiesel Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Biodiesel Fueling Stations Photo of a biodiesel fueling station. Hundreds of biodiesel fueling stations are available in the United States.

406

New Jersey | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

state and local authorities, and private industry partners to get generators and fuel to gas stations that need it. November 6, 2012 Natural gas jitneys like this are Atlantic...

407

Hydrogen vehicle fueling station  

DOE Green Energy (OSTI)

The authors describe a hydrogen vehicle fueling station that receives and stores hydrogen in liquid form and dispenses it either as a liquid or compressed gas. The economics that accrue from the favorable weight and volume advantages of liquid hydrogen support this concept both now and probably for some time to come. The model for liquid transfer to a 120-liter vehicle tank shows that transfer times under five minutes are feasible with pump-assisted transfer, or for pressure transfer with subcooling greater than 1 K. The model for compressed gas transfer shows that underfilling of nearly 30% can occur during rapid filling. Cooling the fill gas to 214 K completely eliminates underfilling.

Daney, D.E.; Edeskuty, F.J.; Daugherty, M.A.; Prenger, F.C.; Hill, D.D.

1995-09-01T23:59:59.000Z

408

Wachs Cutter Tooling Station (4495)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

is similar to previously operated facility tooling and will utilize an existing hydraulic unit. The temporary station location will require electrical feed, ventilation,...

409

The Station Nightclub Fire 2003  

Science Conference Proceedings (OSTI)

... The final report, "Report of the Technical Investigation of The Station Nightclub Fire (NIST NCSTAR 2), Volume 1 and Volume 2 ," includes details of ...

2013-02-07T23:59:59.000Z

410

Solar-Assisted Electric Vehicle Charging Station Interim Report  

DOE Green Energy (OSTI)

Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data by the end of government fiscal year 2012. Lessons learned from the sites completed thus far are being incorporated and are proving to be invaluable in completion of the remaining sites.

Lapsa, Melissa Voss [ORNL; Durfee, Norman [ORNL; Maxey, L Curt [ORNL; Overbey, Randall M [ORNL

2011-09-01T23:59:59.000Z

411

Quarterly Nuclear Power Deployment Scorecard - January 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Deployment Scorecard - January 2013 Power Deployment Scorecard - January 2013 Quarterly Nuclear Power Deployment Scorecard - January 2013 News Updates On October 22, 2012, Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a follow-on solicitation open to other companies and manufacturers, focused

412

Quarterly Nuclear Power Deployment Scorecard - January 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Deployment Scorecard - January 2013 Power Deployment Scorecard - January 2013 Quarterly Nuclear Power Deployment Scorecard - January 2013 News Updates On October 22, 2012, Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a follow-on solicitation open to other companies and manufacturers, focused

413

Management of Solid Waste (Oklahoma) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Solid Waste (Oklahoma) Management of Solid Waste (Oklahoma) Management of Solid Waste (Oklahoma) < Back Eligibility Utility Agricultural Investor-Owned Utility Industrial Municipal/Public Utility Rural Electric Cooperative Program Info State Oklahoma Program Type Environmental Regulations Provider Oklahoma Department of Environmental Quality The Solid Waste Management Division of the Department of Environmental Quality regulates solid waste disposal or any person who generates, collects, transports, processes, and/or disposes of solid waste and/or waste tires. The following solid waste disposal facilities require a solid waste permit prior to construction and/or operation: land disposal facilities; solid waste processing facilities, including: transfer stations; solid waste incinerators receiving waste from off-site sources; regulated medical waste

414

Quarterly Nuclear Deployment Summary, January 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deployment Summary, January 2013 Deployment Summary, January 2013 Quarterly Nuclear Deployment Summary, January 2013 January 30, 2013 - 5:59pm Addthis Quarterly Updates On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

415

FNS Presentation - Hydrogen Station & Hydrogen ICE Vehicles Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Station & Hydrogen ICE Hydrogen Station & Hydrogen ICE Vehicle Operations Federal Network for Sustainability Idaho Falls, Idaho - July 2006 Jim Francfort INL/CON-06-11569 Presentation Outline * Background & Goal * Arizona Public Service (APS) Alternative Fuel (Hydrogen) Pilot Plant - design & operations * Fuel Dispensing * Hydrogen & HCNG Internal Combustion Engine (ICE) Vehicle Testing Activities * Briefly, other AVTA Activities * WWW Information 2 AVTA Background & Goal * Advanced Vehicle Testing Activity (AVTA) is part of the U.S. Department of Energy's (DOE) FreedomCAR and Vehicle Technologies Program * These activities are conducted by the Idaho National Laboratory (INL) & the AVTA testing partner Electric Transportation Applications (ETA) * AVTA Goal - Provide benchmark data for technology

416

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 1030 of 29,416 results. 21 - 1030 of 29,416 results. Page EIS-0387: Y-12 National Security Complex Site-Wide Environmental Impact Statement, Oak Ridge, Tennessee This Final Y-12 Site-wide EIS analyzed the potential environmental impacts of the reasonable alternatives for ongoing and foreseeable future operations and activities at Y-12, including alternatives for changes to site infrastructure and levels of operation (using production capacity as the key metric for comparison). http://energy.gov/nepa/eis-0387-y-12-national-security-complex-site-wide-environmental-impact-statement-oak-ridge Download SEA-04: Special Environmental Analysis Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

417

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 25510 of 26,764 results. 01 - 25510 of 26,764 results. Download Notice of Emergency Action- Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC: Federal Register Notice Volume 71, No. 13- Jan. 20, 2006 Docket No. EO-05-01. Pursuant to 10 CFR 1021.343, the U.S. Department of Energy is issuing this Notice to document emergency actions that it has taken, and to set forth the steps it intends to take... http://energy.gov/oe/downloads/notice-emergency-action-emergency-order-resume-limited-operation-potomac-river Download Advanced Research Projects Agency - Energy Program Specific Recovery Plan http://energy.gov/downloads/advanced-research-projects-agency-energy-program-specific-recovery-plan

418

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 26110 of 28,904 results. 01 - 26110 of 28,904 results. Article DOE Advances Innovative CCS Polygeneration Plant Through NEPA Process The U.S. Department of Energy and the California Energy Commission are working together to advance an innovative carbon capture and storage plant simultaneously through the federal National Environmental Policy Act (NEPA) review and a complementary California Energy Quality Act process. http://energy.gov/fe/articles/doe-advances-innovative-ccs-polygeneration-plant-through-nepa Download CX-009785: Categorical Exclusion Determination Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009785-categorical-exclusion-determination

419

Wind Energy Department Annual Progress Report 2002  

E-Print Network (OSTI)

Wind Energy Department Annual Progress Report 2002 Edited by Birgitte D. Johansen and Ulla Riis The new Test Station at Høvsøre Risø National Laboratory December 2003 Risø-R-1419(EN) #12;Wind Energy December 2003 Risø-R-1419(EN) 2 #12;Wind Energy Department, Annual Report 2002 Introduction Research

420

BIOMASS COGASIFICATION AT POLK POWER STATION  

SciTech Connect

Part of a closed loop biomass crop was recently harvested to produce electricity in Tampa Electric's Polk Power Station Unit No.1. No technical impediments to incorporating a small percentage of biomass into Polk Power Station's fuel mix were identified. Appropriate dedicated storage and handling equipment would be required for routine biomass use. Polk Unit No.1 is an integrated gasification combined cycle (IGCC) power plant. IGCC is a new approach to generating electricity cleanly from solid fuels such as coal, petroleum coke, The purpose of this experiment was to demonstrate the Polk Unit No.1 could process biomass as a fraction of its fuel without an adverse impact on availability and plant performance. The biomass chosen for the test was part of a crop of closed loop Eucalyptus trees.

John McDaniel

2002-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

BIOMASS COGASIFICATION AT POLK POWER STATION  

DOE Green Energy (OSTI)

Part of a closed loop biomass crop was recently harvested to produce electricity in Tampa Electric's Polk Power Station Unit No.1. No technical impediments to incorporating a small percentage of biomass into Polk Power Station's fuel mix were identified. Appropriate dedicated storage and handling equipment would be required for routine biomass use. Polk Unit No.1 is an integrated gasification combined cycle (IGCC) power plant. IGCC is a new approach to generating electricity cleanly from solid fuels such as coal, petroleum coke, The purpose of this experiment was to demonstrate the Polk Unit No.1 could process biomass as a fraction of its fuel without an adverse impact on availability and plant performance. The biomass chosen for the test was part of a crop of closed loop Eucalyptus trees.

John McDaniel

2002-05-01T23:59:59.000Z

422

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network (OSTI)

480 kg/day natural gas reformation station. The table belowReciprocating gas compressor Electrolyzer Station: Thisfor reformer-type stations (natural gas), however, is more

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

423

station locations | OpenEI  

Open Energy Info (EERE)

00 00 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142288500 Varnish cache server station locations Dataset Summary Description Alternative fueling stations are located throughout the United States and their availability continues to grow. The Alternative Fuels Data Center (AFDC) maintains a website where you can find alternative fuels stations near you or on a route, obtain counts of alternative fuels stations by state, Source Alternative Fuels Data Center Date Released December 13th, 2010 (4 years ago) Date Updated December 13th, 2010 (4 years ago) Keywords alt fuel alternative fuels alternative fuels stations biodiesel CNG compressed natural gas E85 Electricity ethanol

424

Energy Department Wins EPA Green Power Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Wins EPA Green Power Award Energy Department Wins EPA Green Power Award Energy Department Wins EPA Green Power Award September 27, 2013 - 10:54am Addthis The Energy Department has won the Environmental Protection Agency's Green Power Leadership Award. | Energy Department photo, credit Quentin Kruger The Energy Department has won the Environmental Protection Agency's Green Power Leadership Award. | Energy Department photo, credit Quentin Kruger Paul Lester Communications Specialist for the Office of Energy Efficiency and Renewable Energy For the Energy Department (DOE), a major focus of our mission involves supporting scientific research in renewable energy technologies. In fact, DOE is so committed to the scientific advances being made every day by the Department, that we even use electricity generated by renewable energy

425

Energy Department Wins EPA Green Power Award | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Wins EPA Green Power Award Energy Department Wins EPA Green Power Award Energy Department Wins EPA Green Power Award September 27, 2013 - 10:54am Addthis The Energy Department has won the Environmental Protection Agency's Green Power Leadership Award. | Energy Department photo, credit Quentin Kruger The Energy Department has won the Environmental Protection Agency's Green Power Leadership Award. | Energy Department photo, credit Quentin Kruger Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy For the Energy Department (DOE), a major focus of our mission involves supporting scientific research in renewable energy technologies. In fact, DOE is so committed to the scientific advances being made every day by the Department, that we even use electricity generated by renewable energy

426

Didcot B: A power station for the 21st century  

Science Conference Proceedings (OSTI)

Didcot B, one of the new generation combined-cycle gas turbine (CCGT) power stations being built on the Didcot site just south of Oxford, England, will eventually be feeding an additional 1370 MW of electrical power into the national grid. It will be more environmentally friendly, considerably more efficient and a great deal less obtrusive than its coal-fired predecessor. The first module of the US$600 million Didcot B project is now almost ready to be handed over to operator, National Power. This will be the first generating station to use Siemen`s latest and most advanced 230 MW V94.3A gas turbine. 3 figs.

Mullins, P.

1996-12-01T23:59:59.000Z

427

Loans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 19, 2011 May 19, 2011 Department of Energy Offers Conditional Commitment for Loan Guarantee to Support Solar Generation Project in Nevada Recovery Act-Funded Solar Generating Facility Bringing Over 600 Jobs to Nevada May 10, 2011 Department of Energy Offers $90.6 Million Conditional Commitment Loan Guarantee to Support Colorado Solar Generating Facility Project is One of the First Utility Scale, High Concentration Photovoltaic Energy Generation Facilities in the U.S. and the Largest of its Kind in the World April 18, 2011 Department of Energy Offers $2.1 Billion Conditional Commitment Loan Guarantee to Support California Solar Thermal Power Plant California Solar Project Estimated to Create Over 1,000 Jobs and Avoid Over 710,000 Tons of Carbon Dioxide Annually April 12, 2011

428

MHK Technologies/Ocean Powered Compressed Air Stations | Open Energy  

Open Energy Info (EERE)

Powered Compressed Air Stations Powered Compressed Air Stations < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Ocean Powered Compressed Air Stations.png Technology Profile Primary Organization Wave Power Plant Inc Technology Resource Click here Wave Technology Type Click here Point Absorber - Submerged Technology Readiness Level Click here TRL 4 Proof of Concept Technology Description The Ocean Powered Compressed Air Station is a point absorber that uses an air pump to force air to a landbased generator The device only needs 4m water depth and electricity production fluctations through storing energy at a constant air pressure Technology Dimensions Device Testing Date Submitted 13:16.5 << Return to the MHK database homepage Retrieved from

429

MHK Technologies/Jiangxia Tidal Power Station | Open Energy Information  

Open Energy Info (EERE)

Jiangxia Tidal Power Station Jiangxia Tidal Power Station < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Jiangxia Tidal Power Station.jpg Technology Profile Primary Organization China Guodian Corporation Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 9 Commercial Scale Production Application Technology Description There are 6 bulb turbine generator units operating in both ebb and flood tides with a total installed capacity up to 3 9 MW Technology Dimensions Technology Nameplate Capacity (MW) 3 9 Device Testing Date Submitted 14:15.7 << Return to the MHK database homepage Retrieved from "http://en.openei.org/w/index.php?title=MHK_Technologies/Jiangxia_Tidal_Power_Station&oldid=681601

430

Southeast regional experiment station. Final report  

DOE Green Energy (OSTI)

This is the final report of the Southeast Regional Experiment Station project. The Florida Solar Energy Center (FSEC), a research institute of the University of Central Florida (UCF), has operated the Southeast Regional Experiment Station (SE RES) for the US Department of Energy (DOE) since September 1982. Sandia National Laboratories, Albuquerque (SNLA) provides technical program direction for both the SE RES and the Southwest Regional Experiment Station (SW RES) located at the Southwest Technology Development Institute at Las Cruces, New Mexico. This cooperative effort serves a critical role in the national photovoltaic program by conducting system evaluations, design assistance and technology transfer to enhance the cost-effective utilization and development of photovoltaic technology. Initially, the research focus of the SE RES program centered on utility-connected PV systems and associated issues. In 1987, the SE RES began evaluating amorphous silicon (a-Si) thin-film PV modules for application in utility-interactive systems. Stand-alone PV systems began receiving increased emphasis at the SE RES in 1986. Research projects were initiated that involved evaluation of vaccine refrigeration, water pumping and other stand-alone power systems. The results of this work have led to design optimization techniques and procedures for the sizing and modeling of PV water pumping systems. Later recent research at the SE RES included test and evaluation of batteries and charge controllers for stand-alone PV system applications. The SE RES project provided the foundation on which FSEC achieved national recognition for its expertise in PV systems research and related technology transfer programs. These synergistic products of the SE RES illustrate the high visibility and contributions the FSEC PV program offers to the DOE.

Not Available

1994-08-05T23:59:59.000Z

431

Alternative Fuels Data Center: Propane Fueling Stations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Stations to someone by E-mail Stations to someone by E-mail Share Alternative Fuels Data Center: Propane Fueling Stations on Facebook Tweet about Alternative Fuels Data Center: Propane Fueling Stations on Twitter Bookmark Alternative Fuels Data Center: Propane Fueling Stations on Google Bookmark Alternative Fuels Data Center: Propane Fueling Stations on Delicious Rank Alternative Fuels Data Center: Propane Fueling Stations on Digg Find More places to share Alternative Fuels Data Center: Propane Fueling Stations on AddThis.com... More in this section... Propane Basics Benefits & Considerations Stations Locations Infrastructure Development Vehicles Laws & Incentives Propane Fueling Stations Photo of a liquefied petroleum gas fueling station. Thousands of liquefied petroleum gas (propane) fueling stations are

432

Hydrogen at the Fueling Station  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen) Service Stations 101 Hydrogen) Service Stations 101 Steven M. Schlasner September 22, 2004 2 DISCLAIMER Opinions expressed within are strictly those of the presenter and do not necessarily represent ConocoPhillips Company. 3 Presentation Outline * Introduction to ConocoPhillips * Introduction to Service Stations * Comparison of Conventional with Hydrogen Fueling Stations * Hydrogen Fueling Life Cycle * Practical Design Example * Concluding Observations 4 ConocoPhillips * 7 th on Fortune's list of largest companies (2003 revenues) * 3 rd largest integrated petroleum company in U.S. * 1 st (largest) petroleum refiner in U.S. * 14,000 retail outlets (350 company-owned) in 44 states * Brands: Conoco, Phillips 66, 76 * 32,800 miles pipeline, owned or interest in * 64 terminals: crude, LPG, refined products

433

Pilgrim Station | Open Energy Information  

Open Energy Info (EERE)

Station Station Jump to: navigation, search Name Pilgrim Station Facility Pilgrim Stage Station Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner ReunionPower/Exergy Developer Exergy Location Twin Falls County ID Coordinates 42.741336°, -114.865865° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.741336,"lon":-114.865865,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

434

Department of Energy Order No. 202-05-3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to herein as Mirant), are hereby ordered to generate electricity at their Potomac River Generating Station (the "Plant") pursuant to the terms of this order. Order No. 202-05-3...

435

Thermal Modeling of NUHOMS HSM-15 and HSM-1 Storage Modules at Calvert Cliffs Nuclear Power Station ISFSI  

Science Conference Proceedings (OSTI)

As part of the Used Fuel Disposition Campaign of the Department of Energy (DOE), visual inspections and temperature measurements were performed on two storage modules in the Calvert Cliffs Nuclear Power Station’s Independent Spent Fuel Storage Installation (ISFSI). Detailed thermal models models were developed to obtain realistic temperature predictions for actual storage systems, in contrast to conservative and bounding design basis calculations.

Suffield, Sarah R.; Fort, James A.; Adkins, Harold E.; Cuta, Judith M.; Collins, Brian A.; Siciliano, Edward R.

2012-10-01T23:59:59.000Z

436

Chinese Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Up Search Page Edit with form History Facebook icon Twitter icon Chinese Station Biomass Facility Jump to: navigation, search Name Chinese Station Biomass Facility Facility...

437

Transit Infrastructure Finance Through Station Location Auctions  

E-Print Network (OSTI)

as the primary transit infrastructure finance method.Paper 2009-04 Transit Infrastructure Finance Through StationWP-2009-04 Transit Infrastructure Finance Through Station

Ian Carlton

2009-01-01T23:59:59.000Z

438

Quantifying the Air Pollution Exposure Consequences of Distributed Electricity Generation  

E-Print Network (OSTI)

Beach Gen Station 1: Duke Energy Moss Landing LLC 2: Moss2: So Cal Edison Co 1: Duke Energy-South Bay Power PL 2:Beach Generating Station Duke Energy Moss Landing LLC AES

Heath, Garvin A.; Granvold, Patrick W.; Hoats, Abigail S.; Nazaroff, William W

2005-01-01T23:59:59.000Z

439

Locating PHEV Exchange Stations in V2G  

E-Print Network (OSTI)

Plug-in hybrid electric vehicles (PHEVs) are an environmentally friendly technology that is expected to rapidly penetrate the transportation system. Renewable energy sources such as wind and solar have received considerable attention as clean power options for future generation expansion. However, these sources are intermittent and increase the uncertainty in the ability to generate power. The deployment of PHEVs in a vehicle-to-grid (V2G) system provide a potential mechanism for reducing the variability of renewable energy sources. For example, PHEV supporting infrastructures like battery exchange stations that provide battery service to PHEV customers could be used as storage devices to stabilize the grid when renewable energy production is fluctuating. In this paper, we study how to best site these stations in terms of how they can support both the transportation system and the power grid. To model this problem we develop a two-stage stochastic program to optimally locate the stations prior to the realizat...

Pan, Feng; Berscheid, Alan; Izraelevitz, David

2010-01-01T23:59:59.000Z

440

MHK Technologies/Float Wave Electric Power Station | Open Energy  

Open Energy Info (EERE)

Wave Electric Power Station Wave Electric Power Station < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Float Wave Electric Power Station.jpg Technology Profile Primary Organization Applied Technologies Company Ltd Technology Resource Click here Wave Technology Type Click here Point Absorber - Floating Technology Readiness Level Click here TRL 5 6 System Integration and Technology Laboratory Demonstration Technology Description The module of FWEPS is an oblong axisymmetrical capsule float which is located on the sea surface Inside the capsule there is a mechanical wave energy converter consisting of an oscillatory system and drive and an electric generator and energy accumulator Under the wave effect the capsule float and inner oscillatory system of the mechanical converter are in continuous oscillatory motion while the drive engaged with the system provides a continuous turn for the electric generator

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EERE News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2013 July 1, 2013 Energy Department Announces Investment to Accelerate Next Generation Biofuels Following last week's rollout of President Obama's plan to cut carbon pollution, the Energy Department today announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel, and jet fuels from biomass. The projects-located in Oklahoma, Tennessee, Utah, and Wisconsin-represent a $13 million Energy Department investment. July 1, 2013 Energy Department Announces New Investment to Accelerate Next Generation Biofuels The Energy Department announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel and jet fuels from biomass.

442

Technical Analysis of the Hydrogen Energy Station Concept, Phase I and Phase II  

DOE Green Energy (OSTI)

Phase I Due to the growing interest in establishing a domestic hydrogen infrastructure, several hydrogen fueling stations already have been established around the country as demonstration units. While these stations help build familiarity with hydrogen fuel in their respective communities, hydrogen vehicles are still several years from mass production. This limited number of hydrogen vehicles translates to a limited demand for hydrogen fuel, a significant hurdle for the near-term establishment of commercially viable hydrogen fueling stations. By incorporating a fuel cell and cogeneration system with a hydrogen fueling station, the resulting energy station can compensate for low hydrogen demand by providing both hydrogen dispensing and combined heat and power (CHP) generation. The electrical power generated by the energy station can be fed back into the power grid or a nearby facility, which in turn helps offset station costs. Hydrogen production capacity not used by vehicles can be used to support building heat and power loads. In this way, an energy station can experience greater station utility while more rapidly recovering capital costs, providing an increased market potential relative to a hydrogen fueling station. At an energy station, hydrogen is generated on-site. Part of the hydrogen is used for vehicle refueling and part of the hydrogen is consumed by a fuel cell. As the fuel cell generates electricity and sends it to the power grid, excess heat is reclaimed through a cogeneration system for use in a nearby facility. Both the electrical generation and heat reclamation serve to offset the cost of purchasing the equivalent amount of energy for nearby facilities and the energy station itself. This two-phase project assessed the costs and feasibility of developing a hydrogen vehicle fueling station in conjunction with electricity and cogenerative heat generation for nearby Federal buildings. In order to determine which system configurations and operational patterns would be most viable for an energy station, TIAX developed several criteria for selecting a representative set of technology configurations. TIAX applied these criteria to all possible technology configurations to determine an optimized set for further analysis, as shown in Table ES-1. This analysis also considered potential energy station operational scenarios and their impact upon hydrogen and power production. For example, an energy station with a 50-kWe reformer could generate enough hydrogen to serve up to 12 vehicles/day (at 5 kg/fill) or generate up to 1,200 kWh/day, as shown in Figure ES-1. Buildings that would be well suited for an energy station would utilize both the thermal and electrical output of the station. Optimizing the generation and utilization of thermal energy, hydrogen, and electricity requires a detailed look at the energy transfer within the energy station and the transfer between the station and nearby facilities. TIAX selected the Baseline configuration given in Table ES-1 for an initial analysis of the energy and mass transfer expected from an operating energy station. Phase II The purpose of this technical analysis was to analyze the development of a hydrogen-dispensing infrastructure for transportation applications through the installation of a 50-75 kW stationary fuel cell-based energy station at federal building sites. The various scenarios, costs, designs and impacts of such a station were quantified for a hypothetical cost-shared program that utilizes a natural gas reformer to provide hydrogen fuel for both the stack(s) and a limited number of fuel cell powered vehicles, with the possibility of using cogeneration to support the building heat load.

TIAX, LLC

2005-05-04T23:59:59.000Z

443

Department Codes  

NLE Websites -- All DOE Office Websites (Extended Search)

Department Codes Department Codes Code Organization BO Bioscience Department BU Business Development & Analysis Office DI Business Operations NC Center for Functional Nanomaterials CO Chemistry Department AD Collider Accelerator Department PA Community, Education, Government and Public Affairs CC Computational Science Center PM Condensed Matter Physics and Materials Science Department CI Counterintelligence AE Department of Energy DC Directorate - Basic Energy Sciences DK Directorate - CEGPA DE Directorate - Deputy Director for Operations DO Directorate - Director's Office DH Directorate - Environment, Safety and Health DF Directorate - Facilities and Operations DA Directorate - Global and Regional Solutions DB Directorate - Nuclear and Particle Physics DL Directorate - Photon Sciences

444

DOE Permitting Hydrogen Facilities: Hydrogen Fueling Stations  

NLE Websites -- All DOE Office Websites (Extended Search)

Stations Stations Public-use hydrogen fueling stations are very much like gasoline ones. In fact, sometimes, hydrogen and gasoline cars can be fueled at the same station. These stations offer self-service pumps, convenience stores, and other services in high-traffic locations. Photo of a Shell fueling station showing the site convenience store and hydrogen and gasoline fuel pumps. This fueling station in Washington, D.C., provides drivers with both hydrogen and gasoline fuels Many future hydrogen fueling stations will be expansions of existing fueling stations. These facilities will offer hydrogen pumps in addition to gasoline or natural gas pumps. Other hydrogen fueling stations will be "standalone" operations. These stations will be designed and constructed to

445

Map Data: Alternative Fuel Stations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(GIS) program to view the data. altfuelsmercator.zip More Documents & Publications Green Button Sample from Texas Green Button Sample Data from PG&E CX-006856: Categorical...

446

Help Design the Hydrogen Fueling Station of Tomorrow | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Make Your Mark in the 2011 Hydrogen Student Design Contest A hydrogen-powered Toyota Prius pulls up to Humboldt State University's student designed hydrogen fueling...

447

Combustion Effects Investigation at the Martin Lake Station  

Science Conference Proceedings (OSTI)

One key to improving the availability of coal-fired plants is an improved understanding of the impact of combustion conditions on deposit formation on furnace walls. This report builds on a previously developed model of a unit at the Martin Lake Generating Station to investigate the conditions contributing to excessive slagging at the plant.

2009-11-25T23:59:59.000Z

448

Planning solar array operations on the international space station  

Science Conference Proceedings (OSTI)

Flight controllers manage the orientation and modes of eight large solar arrays that power the International Space Station (ISS). The task requires generating plans that balance complex constraints and preferences. These considerations include context-dependent ... Keywords: Planning, constraint satisfaction, optimization, scheduling, space mission operations

Sudhakar Y. Reddy; Jeremy D. Frank; Michael J. Iatauro; Matthew E. Boyce; Elif Kürklü; Mitchell Ai-Chang; Ari K. Jónsson

2011-07-01T23:59:59.000Z

449

History of Radio Station WWV  

Science Conference Proceedings (OSTI)

... to 11 pm The 50 W transmissions used a ... the Department of Agriculture in the distribution of market ... purpose would be the transmission of standard ...

2010-10-05T23:59:59.000Z

450

Plug-In Electric Vehicle Handbook for Public Charging Station Hosts (Brochure), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

Plug-In Electric Vehicle Handbook Plug-In Electric Vehicle Handbook for Public Charging Station Hosts Plug-In Electric Vehicle Handbook for Public Charging Station Hosts 2 Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . 3 PEV Basics . . . . . . . . . . . . . . . . . . . . . . . . . 4 Charging Basics . . . . . . . . . . . . . . . . . . . . . 6 Benefits and Costs of Hosting a Charging Station . . . . . . . . . . . 9 Charging Station Locations and Hosts . . . . . . . . . . . . . . . . . 12 Ownership and Payment Models . . . . . . 14 Installing and Maintaining Charging Stations . . . . . . . . . . . . . . . . . . . 15 Electrifying the Future . . . . . . . . . . . . . . 19 Clean Cities Helps Establish PEV Charging Stations Establishing plug-in electric vehicle (PEV) charging stations requires unique knowledge and skills . If you need help, contact your local Clean Cities coordinator . Clean Cities is the U .S . Department of Energy's flagship alterna- tive-transportation

451

City of Alexandria's Application for Rehearing | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Pepco and PJM Interconnection...

452

Storage | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storage Storage Storage Energy storage isn’t just for AA batteries. Thanks to investments from the Energy Department's Advanced Research Projects Agency-Energy (ARPA-E), energy storage may soon play a bigger part in our electricity grid, making it possible to generate more renewable electricity. Learn more. Energy storage isn't just for AA batteries. Thanks to investments from the Energy Department's Advanced Research Projects Agency-Energy (ARPA-E), energy storage may soon play a bigger part in our electricity grid, making it possible to generate more renewable electricity. Learn more.

453

Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trona Injection Tests: Mirant Potomac River Station, Unit 1, Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Docket No. EO-05-01: Trona injection tests were conducted at Mirant's Potomac River Station on Unit 1 between November 12 and December 23, 2005. The purpose of these tests was to determine the capability of dry injection of trona to achieve substantial SO2 removal from the stack discharge, and the determination of other operating impacts from he trona injection, if any. Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of

454

Blog Feed: Vehicles | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2011 September 15, 2011 A customer fills up at a new Energy Department supported fuel cell hydrogen energy station in Fountain Valley, California. | Photo courtesy of Air Products and Chemicals. Fuel Station of the Future- Innovative Approach to Fuel Cell Technology Unveiled in California Imagine pulling-up to a fuel station that supplies your car with clean, renewable fuel. Now imagine that, while you're filling up, this same fuel-station just so happens to be providing power back to an entire industrial facility. Sound a little far-fetched? Perhaps, but, in a first-of-its kind milestone-a new fuel cell and hydrogen energy station in Fountain Valley, CA, is doing just that. September 15, 2011 The Liquid Metal Battery is comprised of liquid metal electrodes and a liquid electrolyte of differing densities, which allows the liquids to separate and stratify without the need for any solid separator.

455

Daily Reporting Rainfall Station DON & PROSERPINE RIVERS Manual Heavy Rainfall Station  

E-Print Network (OSTI)

Daily Reporting Rainfall Station DON & PROSERPINE RIVERS Manual Heavy Rainfall Station Manual River Station Telemetry Rainfall Station Telemetry River Station Revised: Nov 2009 MAP 121.1 FLOOD WARNING Bowen Tide TM Bowen P/S AL GretaCk Peter Faust Dam Crystal Brook Andromache R GoorgangaCk Jocheims TM

Greenslade, Diana

456

Energy Blog | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2013 31, 2013 Secretary Chu Tours the 2013 Washington Auto Show Highlights from the Secretary's tour of the Washington Auto Show floor. January 31, 2013 As part of the EV Everywhere Grand Challenge, the new Workplace Charging Challenge aims to expand access to charging stations in cities across the U.S. | Infographic by Sarah Gerrity, Energy Department. EV Everywhere Charges Up the Workplace As part of the EV Everywhere Grand Challenge, the new Workplace Charging Challenge aims to expand access to charging stations in cities across the U.S. January 31, 2013 Secretary of the Navy Ray Mabus speaks to attendees at the 2011 Energy Innovation Summit in Washington, DC. | Energy Department photo. ARPA-E and the Military Team Up on New Technologies and Summit Partnerships

457

Analysis of accident sequences and source terms at waste treatment and storage facilities for waste generated by U.S. Department of Energy Waste Management Operations, Volume 3: Appendixes C-H  

Science Conference Proceedings (OSTI)

This report contains the Appendices for the Analysis of Accident Sequences and Source Terms at Waste Treatment and Storage Facilities for Waste Generated by the U.S. Department of Energy Waste Management Operations. The main report documents the methodology, computational framework, and results of facility accident analyses performed as a part of the U.S. Department of Energy (DOE) Waste Management Programmatic Environmental Impact Statement (WM PEIS). The accident sequences potentially important to human health risk are specified, their frequencies are assessed, and the resultant radiological and chemical source terms are evaluated. A personal computer-based computational framework and database have been developed that provide these results as input to the WM PEIS for calculation of human health risk impacts. This report summarizes the accident analyses and aggregates the key results for each of the waste streams. Source terms are estimated and results are presented for each of the major DOE sites and facilities by WM PEIS alternative for each waste stream. The appendices identify the potential atmospheric release of each toxic chemical or radionuclide for each accident scenario studied. They also provide discussion of specific accident analysis data and guidance used or consulted in this report.

Mueller, C.; Nabelssi, B.; Roglans-Ribas, J. [and others

1995-04-01T23:59:59.000Z

458

Barrow Meteoroloigcal Station (BMET) Handbook  

SciTech Connect

The Barrow meteorology station (BMET) uses mainly conventional in situ sensors mounted at four different heights on a 40 m tower to obtain profiles of wind speed, wind direction, air temperature, and humidity. It also obtains barometric pressure, visibility, and precipitation data.

Ritsche, MT

2004-11-01T23:59:59.000Z

459

NE Press Releases | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 27, 2012 Energy Department Announces New Investments in University-Led Nuclear Energy Innovation Three University-Led Projects to Develop Next Generation Technologies,...

460

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(RFA) as part of the Department's efforts to recruit and train the next generation of nuclear scientists and engineers. http:energy.govnearticlesdepartment-energy-issues-r...

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consumer Residential Wind Buying & Making Electricity Minnesota Department of Commerce Xcel Energy Wind and Biomass Generation Mandate Minnesota Investor-Owned Utility Bioenergy...

462

Surface Water Temperatures At Shore Stations, United States West Coast 1984  

E-Print Network (OSTI)

off the rocks near the water intake for the laboratory. MonoStation Off rocks near water intake for laboratory Trinidadthat monitors the cool- ing intake water for the generators.

Scripps Institution of Oceanography

1985-01-01T23:59:59.000Z

463

Surface Water Temperatures At Shore Stations, United States West Coast 1986  

E-Print Network (OSTI)

off the rocks near the water intake for the laboratory. MonoStation Off rocks near water intake for laboratory Farallónthat monitors the cool­ ing intake water for the generators.

Scripps Institution of Oceanography

1987-01-01T23:59:59.000Z

464

Surface Water Temperatures At Shore Stations, United States West Coast 1983  

E-Print Network (OSTI)

off the rocks near the water intake for the laboratory. MonoStation Off rocks near water intake for laboratory Granitethat monitors the cool­ ing intake water for the generators.

Scripps Institution of Oceanography

1984-01-01T23:59:59.000Z

465

Surface Water Temperatures At Shore Stations, United States West Coast 1985  

E-Print Network (OSTI)

off the rocks near the water intake for the laboratory.Station Off rocks near water intake for laboratory Farallónthat monitors the cool­ ing intake water for the generators.

Scripps Institution of Oceanography

1986-01-01T23:59:59.000Z

466

Energy Department Finalizes Loan Guarantee to Support California...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Support California Solar Generation Project Energy Department Finalizes Loan Guarantee to Support California Solar Generation Project September 30, 2011 - 3:15pm Addthis...

467

Energy Department Finalizes Loan Guarantee to Support California...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee to Support California Solar Generation Project Energy Department Finalizes Loan Guarantee to Support California Solar Generation Project September 30, 2011 - 3:15pm...

468

EERE News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2013 July 1, 2013 Energy Department Announces New Investment to Accelerate Next Generation Biofuels The Energy Department announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel and jet fuels from biomass. July 1, 2013 New Investments to Accelerate Next Generation Biofuels Following last week's rollout of President Obama's plan to cut carbon pollution, the Energy Department today announced four research and development projects to bring next generation biofuels on line faster and drive down the cost of producing gasoline, diesel, and jet fuels from biomass. The projects-located in Oklahoma, Tennessee, Utah, and Wisconsin-represent a $13 million Energy Department investment.

469

Feedwater Iron Optimization: Quad Cities Generating Station Unit 1  

Science Conference Proceedings (OSTI)

EPRI's BWR Water Chemistry Guidelines 2004 Revisions (report 1008192) recommends feedwater iron control in the range of 0.1 ppb 1.0 ppb for plants operating with reducing chemistry conditions for intergranular stress corrosion cracking (IGSCC) mitigation. Since all U.S. plants now operate under moderate hydrogen water chemistry (HWC-M) or noble metals chemical addition and hydrogen water chemistry (NMCA+HWC), it is appropriate to target the lower end of the range (0.1 0.5 ppb) to minimize zinc requiremen...

2008-08-18T23:59:59.000Z

470

DOE/EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota (April 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL IMPACT STATEMENT Deer Creek Station Energy Facility Project Brookings County, South Dakota U.S. Department of Energy Western Area Power Administration Upper Great Plains Region Billings, Montana DOE/EIS-0415 April 2010 Final Environmental Impact Statement Cover Sheet i COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agency: U.S. Department of Agriculture, Rural Utilities Service

471

An Assessment of the Near-Term Costs of Hydrogen Refueling Stations and Station Components  

E-Print Network (OSTI)

the literature provides cost estimates of actual stations.Hydrogen Supply: Cost Estimate for Hydrogen Pathways -Appendix A: Summary of Cost Estimates for 10 Station Types

Weinert, Jonathan X.; Lipman, Timothy

2006-01-01T23:59:59.000Z

472

EIS-0037: Springfield City Utilities, James River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Springfield City Utilities, James River Generating Station, Power Plants 3 and 4, Springfield, Greene County, Missouri EIS-0037: Springfield City Utilities, James River...

473

CX-002674: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

674: Categorical Exclusion Determination 674: Categorical Exclusion Determination CX-002674: Categorical Exclusion Determination AES ES Westover LLC, Project Dyno Electric Grid Stability Advanced Battery Systems CX(s) Applied: B2.5 Date: 06/28/2010 Location(s): Johnson City, New York Office(s): Loan Guarantee Program Office The Department of Energy's (DOE) proposed action is to issue a loan guarantee to AES ES Westover LLC for the proposed Project Dyno (the Project), pursuant to Title XVII of the Energy Policy Act of 2005. The Project is an advanced lithium ion battery and power control system used to store power to help maintain the stability of the electric power grid. The Project would be located at the site of an operating coal-fired power generating station immediately adjacent to an existing electrical

474

CX-002674: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-002674: Categorical Exclusion Determination AES ES Westover LLC, Project Dyno Electric Grid Stability Advanced Battery Systems CX(s) Applied: B2.5 Date: 06/28/2010 Location(s): Johnson City, New York Office(s): Loan Guarantee Program Office The Department of Energy's (DOE) proposed action is to issue a loan guarantee to AES ES Westover LLC for the proposed Project Dyno (the Project), pursuant to Title XVII of the Energy Policy Act of 2005. The Project is an advanced lithium ion battery and power control system used to store power to help maintain the stability of the electric power grid. The Project would be located at the site of an operating coal-fired power generating station immediately adjacent to an existing electrical

475

Comments of the City of Alexandria Virginia to the U.S. Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the City of Alexandria Virginia to the U.S. Department of the City of Alexandria Virginia to the U.S. Department of Energy's Special Environmental Analysis concerning DOE Emergency Orders 202-05-03, 202-06-02, 202-06-2A Comments of the City of Alexandria Virginia to the U.S. Department of Energy's Special Environmental Analysis concerning DOE Emergency Orders 202-05-03, 202-06-02, 202-06-2A Original Docket No. EO-05-01. Order No. 202-07-02: The City of Alexandria, Virginia ("Alexandria") hereby submits these Comments to the Special Environmental Analysis ("SEA") for Actions Taken under U.S. Department of Energy ("DOE") Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria (Re: DOE Order Nos. 202-05-3, 202-06-2, 202- 06-2A). Comments of the City of Alexandria Virginia to the U.S. Department of

476

alternative fuels stations | OpenEI  

Open Energy Info (EERE)

fuels stations fuels stations Dataset Summary Description Alternative fueling stations are located throughout the United States and their availability continues to grow. The Alternative Fuels Data Center (AFDC) maintains a website where you can find alternative fuels stations near you or on a route, obtain counts of alternative fuels stations by state, Source Alternative Fuels Data Center Date Released December 13th, 2010 (4 years ago) Date Updated December 13th, 2010 (4 years ago) Keywords alt fuel alternative fuels alternative fuels stations biodiesel CNG compressed natural gas E85 Electricity ethanol hydrogen liquefied natural gas LNG liquefied petroleum gas LPG propane station locations Data text/csv icon alt_fuel_stations_apr_4_2012.csv (csv, 2.3 MiB) Quality Metrics Level of Review Peer Reviewed

477

Alternative Fueled Vehicle Charging Station Credit (Connecticut...  

Open Energy Info (EERE)

or improvements to existing stations which allow that station to provide CNG, LNG, or LPG (propane); 2) equipment used to convert vehicles to run exclusively on one of these...

478

Modern generator protection systems  

SciTech Connect

The special problems of the protection of generating stations with large machines connected to large integrated networks are presented. The coordination between the protective relays and tripping functions and the reliability of the protection scheme are important considerations in modern plants. Primary and backup protective functions, the applications, and their divisions into fault detection and ''fault prevention'' categories are considered. Testing and maintenance of the generator protection system including automatic calibration testing equipment is also discussed. The concept of the generator protection as a completely coordinated system and its realization with solid state protective relays is also presented. 9 refs.

Pencinger, C.J.

1981-01-01T23:59:59.000Z

479

Hydrogen Station & ICE Vehicle Operations and Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Station & ICE Vehicle Operations and Testing Jim Francfort for Lee Slezak WestStart CALSTART Hydrogen Internal Combustion Engine Symposium - February 2006 INL/CON-06-01109 Presentation Outline * Background and Goal * Arizona Public Service (APS) Alternative Fuel (Hydrogen) Pilot Plant - design and operations * Fuel Dispensing * Prototype Dispenser Testing * Hydrogen and HCNG Internal Combustion Engine (ICE) Vehicle Testing Activities * WWW Information AVTA Background and Goal * AVTA is part of the U.S. Department of Energy's FreedomCAR and Vehicle Technologies Program * These activities are conducted by the Idaho National Laboratory (INL) and the AVTA testing partner Electric Transportation Applications * AVTA Goal - Provide benchmark data for technology

480

NGPL Louisiana station nears completion  

Science Conference Proceedings (OSTI)

Construction on a 3,600-hp compressor station on the Louisiana line of Natural Gas Pipeline Co. of America near Henry, La., was scheduled for completion later this month. The Louisiana line extends some 205 miles along the Gulf Coast between New Caney, Tex., and the Henry hub area. The new compressor station will be located about 44 miles west of the Henry hub. Work began on the $5.1 million expansion project in Cameron Parish, La., in May following Federal Energy Regulatory Commission (FERC) certification. By mid-September, the compressor building, service building, and meter house has been erected, final compressor inspections were under way, and gas piping tie-ins had been completed, according to NGPL. Powered by three 1,200-hp Solar Saturn gas-fired centrifugal engines, the station is designed to increase the capacity of the Louisiana line east of the Stingray pipeline system by up to 220 MMcfd. Current capacity for east bound flows is approximately 900 MMcfd.

Not Available

1990-10-22T23:59:59.000Z

Note: This page contains sample records for the topic "generating station department" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Broadcast Outages for NIST Radio Station WWVB  

Science Conference Proceedings (OSTI)

... Numerous short outages while station was undergoing maintenance and testing during daylight hours. WWVB operated at reduced power during ...

482

Yankee Nuclear Power Station - analysis of decommissioning costs  

SciTech Connect

The preparation of decommissioning cost estimates for nuclear power generating stations has received a great deal of interest in the last few years. Owners are required by regulation to ensure that adequate funds are collected for the timely decommissioning of their facilities. The unexpected premature shutdown of several facilities and uncertainties associated with radioactive waste disposal and long-term spent-fuel storage, when viewed in the light of a deregulated electric utility industry, has caused many companies to reevaluate their decommissioning cost estimates. The decommissioning of the Yankee Nuclear Power Station represents the first large-scale project involving the complete decontamination and dismantlement of a commercial light water nuclear power generation facility in the United States. Since this pressurized water reactor operated for 32 yr at a respectable 74% lifetime capacity factor, the actual costs and resources requ