Powered by Deep Web Technologies
Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Interstate Mining Compact Commission (multi-state) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Interstate Mining Compact Commission (multi-state) Interstate Mining Compact Commission (multi-state) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info Start Date 1970 State Alabama Program Type Safety and Operational Guidelines Siting and Permitting Provider Interstate Mining Compact Commission The Interstate Mining Compact is a multi-state governmental agency / organization that represents the natural resource and related environmental protection interests of its member states. Currently, 23 states are members to the compact, and 6 additional states are associate members. The compact

2

Interstate Oil and Gas Conservation Compact (Multiple States) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interstate Oil and Gas Conservation Compact (Multiple States) Interstate Oil and Gas Conservation Compact (Multiple States) Interstate Oil and Gas Conservation Compact (Multiple States) < Back Eligibility Commercial Developer Industrial Investor-Owned Utility Municipal/Public Utility Utility Program Info State Alabama Program Type Environmental Regulations Provider Interstate Oil and Gas Compact Commission The Interstate Oil and Gas Compact Commission assists member states efficiently maximize oil and natural gas resources through sound regulatory practices while protecting the nation's health, safety and the environment. The Commission serves as the collective voice of member governors on oil and gas issues and advocates states' rights to govern petroleum resources within their borders. The Commission formed the Geological CO2 Sequestration Task Force, which

3

Interstate Oil and Gas Conservation Compact (Maryland) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interstate Oil and Gas Conservation Compact (Maryland) Interstate Oil and Gas Conservation Compact (Maryland) Interstate Oil and Gas Conservation Compact (Maryland) < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Maryland Program Type Siting and Permitting Provider Interstate Oil and Gas Compact Commission This legislation authorizes the State to join the Interstate Compact for the Conservation of Oil and Gas. The Compact is an agreement that has been entered into by 30 oil- and gas-producing states, as well as eight associate states and 10 international affiliates (including seven Canadian provinces). Members participate in the Interstate Oil and Gas Compact

4

California Energy Commission - Natural Gas Consumption by Utility  

Open Energy Info (EERE)

California Energy Commission - Natural Gas Consumption by Utility (1990-2009) California Energy Commission natural gas consumption data by Utility company for Commercial,...

5

Colorado Oil and Gas Commission - Production Data (Jan - Mar...  

Open Energy Info (EERE)

Colorado Oil and Gas Commission - Production Data (Jan - Mar 2011) The Colorado Oil and Gas Commission is the place where Colorado oil, gas, and geothermal data is stored and made...

6

Alaska Oil and Gas Conservation Commission: February 2011 Drilling...  

Open Energy Info (EERE)

Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas...

7

Natural Gas Regulation - Delaware Public Service Commission (Delaware) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Regulation - Delaware Public Service Commission Natural Gas Regulation - Delaware Public Service Commission (Delaware) Natural Gas Regulation - Delaware Public Service Commission (Delaware) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Fuel Distributor Program Info State Delaware Program Type Generating Facility Rate-Making Provider Delaware Public Service Commission The Delaware Public Service Commission regulates only the distribution of natural gas to Delaware consumers. The delivery and administrative costs associated with natural gas distribution are determined in base rate proceedings before the Commission. The recovery of costs associated with the natural gas used by customers is determined annually as part of fuel adjustment proceedings. As a result of this process, rates for natural gas

8

Compact Filter Design for Gas Treatment Centers - Programmaster.org  

Science Conference Proceedings (OSTI)

An Innovative Compact Heat Exchanger Solution for Aluminium Off-Gas Cooling and Heat Recovery Autonomous Vehicle and Smelter Technologies Compact...

9

Public Service Commission and Natural Gas Safety Standards (Missouri)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes the state Public Service Commission, which has regulatory authority over the electric, gas, water, and telecommunications utilities. Section 386.572 of this legislation...

10

Colorado Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Conservation Commission Oil and Gas Conservation Commission Name Colorado Oil and Gas Conservation Commission Place Denver, Colorado References COGCC Website[1] This article is a stub. You can help OpenEI by expanding it. Colorado Oil and Gas Conservation Commission is an organization based in Denver, Colorado. The mission of the Colorado Oil and Gas Conservation Commission (COGCC) is to foster the responsible development of Colorado's oil and gas natural resources. Responsible development results in: The efficient exploration and production of oil and gas resources in a manner consistent with the protection of public health, safety and welfare The prevention of waste The protection of mineral owners' correlative rights The prevention and mitigation of adverse environmental impacts

11

Experience with Commissioning New Generation Gas Suspension ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Experience with Commissioning...

12

Compact, high energy gas laser  

DOE Patents (OSTI)

An electrically pumped gas laser amplifier unit having a disc-like configuration in which light propagation is radially outward from the axis rather than along the axis. The input optical energy is distributed over a much smaller area than the output optical energy, i.e., the amplified beam, while still preserving the simplicity of parallel electrodes for pumping the laser medium. The system may thus be driven by a comparatively low optical energy input, while at the same time, owing to the large output area, large energies may be extracted while maintaining the energy per unit area below the threshold of gas breakdown.

Rockwood, Stephen D. (Los Alamos, NM); Stapleton, Robert E. (Los Alamos, NM); Stratton, Thomas F. (Los Alamos, NM)

1976-08-03T23:59:59.000Z

13

California Energy Commission Assessment of Natural Gas Combined Cycle  

E-Print Network (OSTI)

California Energy Commission 1 Assessment of Natural Gas Combined Cycle Plants for Carbon Dioxide Capture and Storage in a Gas-Dominated Electricity Market California Energy Commission Request for Proposals RFP # 500-10-502 Pre-Bid Conference Date: Wednesday, November 3, 2010 #12;California Energy

14

Arizona Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Commission Oil and Gas Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission State Arizona Name Arizona Oil and Gas Commission Address 416 W. Congress Street, Suite 100 City, State Tucson, Arizona Zip 85701 Website http://www.azogcc.az.gov/ Coordinates 32.221642°, -110.977439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.221642,"lon":-110.977439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

15

California Energy Commission - Natural Gas Consumption by County  

Open Energy Info (EERE)

County (2006-2009) Natural gas consumption data from the California Energy Commission sorted by County for Residential and Non-residential from 2006 to 2009. 2010-12-21T23:17:54Z...

16

Oil and Gas Commission General Rules and Regulations (Arkansas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission General Rules and Regulations (Arkansas) Commission General Rules and Regulations (Arkansas) Oil and Gas Commission General Rules and Regulations (Arkansas) < Back Eligibility Agricultural Commercial Construction Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Natural Resources The Oil and Gas Commission General Rules and Regulations are the body of rules and regulations that relate to natural gas production in Arkansas. The statutory law is found Arkansas Code Annotated Title 15 chapter 72. Contained in this summary are the rules and regulations most relevant to

17

Commission ushers in new era in Mexican gas industry  

Science Conference Proceedings (OSTI)

Transportation and distribution of natural gas in Mexico are undergoing fundamental changes as a result of the 1995 passage by the Congress of Mexico of the law that created the Energy Regulatory Commission (Comision Reguladora de Energia--CRE). The law mandates that the commission must achieve a competitive, efficient, safe, and sustainable gas industry, allowing the country to make the difficult energy transition to open gas and electricity markets relying on cleaner fuels. The paper discusses the situation before CRE, the regulatory framework, market development, and the North American market.

Monteforte, R. [Energy Regulatory Commission of Mexico, Mexico City (Mexico)

1998-04-06T23:59:59.000Z

18

Alaska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Conservation Commission Conservation Commission Jump to: navigation, search Logo: Alaska Oil and Gas Conservation Commission State Alaska Name Alaska Oil and Gas Conservation Commission Address 333 W. 7th Ave., Ste. 100 City, State Anchorage, Alaska Zip 9950 Website http://doa.alaska.gov/ogc/ Coordinates 61.215808°, -149.8889769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.215808,"lon":-149.8889769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

19

Interstate Oil and Gas Conservation Compact (Montana) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Montana) Interstate Oil and Gas Conservation Compact (Montana) Eligibility Utility Commercial Investor-Owned Utility Industrial Construction MunicipalPublic Utility Rural Electric...

20

Wyoming Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Wyoming Oil and Gas Conservation Commission Wyoming Oil and Gas Conservation Commission Jump to: navigation, search State Wyoming Name Wyoming Oil and Gas Conservation Commission Address 2211 King Blvd City, State Casper, Wyoming Zip 82602 Website http://wogcc.state.wy.us/ Coordinates 42.8433001°, -106.3511243° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8433001,"lon":-106.3511243,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Railroad Commission of Texas, Oil and Gas Division | Open Energy  

Open Energy Info (EERE)

Railroad Commission of Texas, Oil and Gas Division Railroad Commission of Texas, Oil and Gas Division Jump to: navigation, search State Texas Name Texas Railroad Commission, Oil and Gas Division Address 1701 N. Congress City, State Austin, Texas Zip 78711-2967 Website http://www.rrc.state.tx.us/dat Coordinates 30.2759689°, -97.7359951° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2759689,"lon":-97.7359951,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

22

Oklahoma Corporate Commission Oil and Gas | Open Energy Information  

Open Energy Info (EERE)

Corporate Commission Oil and Gas Corporate Commission Oil and Gas Jump to: navigation, search State Oklahoma` Name Oklahoma Corporate Commission Oil and Gas City, State Oklahoma City, Oklahoma Zip 73152-2000 Website http://www.occeweb.com/og/ogho Coordinates 35.49°, -97.51° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.49,"lon":-97.51,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

23

Arkansas Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Arkansas Oil and Gas Commission Arkansas Oil and Gas Commission Jump to: navigation, search State Arkansas Name Arkansas Oil and Gas Commission Address 301 Natural Resources Dr. Ste 102 City, State Little Rock, AR Zip 72205 Website http://www.aogc.state.ar.us/JD Coordinates 34.7586275°, -92.3894219° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.7586275,"lon":-92.3894219,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

24

North Dakota Industrial Commission, Oil and Gas Divisioin | Open Energy  

Open Energy Info (EERE)

North Dakota Industrial Commission, Oil and Gas Divisioin North Dakota Industrial Commission, Oil and Gas Divisioin Jump to: navigation, search State North Dakota Name North Dakota Industrial Commission, Oil and Gas Divisioin Address 600 East Boulevard Ave Dept 405 City, State Bismarck, North Dakota Zip 58505-0840 Website https://www.dmr.nd.gov/oilgas/ Coordinates 46.8206977°, -100.7827515° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.8206977,"lon":-100.7827515,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

25

Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit  

Open Energy Info (EERE)

Oil and Gas Conservation Commission: February 2011 Drilling & Permit Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly

26

Kansas Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Kansas Oil and Gas Conservation Commission Jump to: navigation, search State Kansas Name Kansas Oil and Gas Conservation Commission Address 1500 SW Arrowhead Road City, State Topeka, KS Zip 66604-4027 Website http://www.kcc.state.ks.us/con Coordinates 39.04059°, -95.756198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.04059,"lon":-95.756198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

27

Natural Gas Outlook - Presented to: Kansas Corporation Commission  

Reports and Publications (EIA)

Presented to: Kansas Corporation Commission, October 28, 2003, Presented by: William Trapmann, Energy Information Administration

Information Center

2003-11-01T23:59:59.000Z

28

Commissioning  

SciTech Connect

Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

Huta, L.G.

1995-12-01T23:59:59.000Z

29

Nebraska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

State Nebraska State Nebraska Name Nebraska Oil and Gas Conservation Commission Address 922 Illinois City, State Sidney, Nebraska Zip 69162 Website http://www.nogcc.ne.gov/ Coordinates 41.1449288°, -102.9758174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.1449288,"lon":-102.9758174,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

30

Colorado Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

State Colorado State Colorado Name Colorado Oil and Gas Commission Address 1120 Lincoln Street, Suite 801 City, State Denver, CO Zip 80203 Website http://cogcc.state.co.us/ Coordinates 39.734421°, -104.985764° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.734421,"lon":-104.985764,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

31

Oil and Gas Commission General Rules and Regulations Continued(Arkansas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oil and Gas Commission General Rules and Regulations Oil and Gas Commission General Rules and Regulations Continued(Arkansas) Oil and Gas Commission General Rules and Regulations Continued(Arkansas) < Back Eligibility Agricultural Commercial Construction Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Utility Program Info State Arkansas Program Type Siting and Permitting Provider Department of Natural Resources The General Rules have been adopted by the Oil and Gas Commission in accordance with applicable state law requirements and are General Rules of state-wide application, applying to the conservation and prevention of waste of crude oil and natural gas in the State of Arkansas and protection

32

Compact Ceramic Heat Exchangers for Corrosive Waste Gas Applications  

E-Print Network (OSTI)

The development of large ceramic heat exchangers is described and performance data given for units installed on steel industry soaking pits in the U.K. Operational experience since 1973 confirms that ceramic heat exchangers capable of operating with high airside pressures have long lives and low maintenance even when operating with dirty gases at 1350 deg. C and preheating combustion air to 800 deg. C. The design of compact units suitable for factory assembly is also described. Units have been developed for low temperature corrosive gas situations and have been applied to the pottery industry and are being developed for coal fired air heaters for the food industry.

Laws, W. R.; Reed, G. R.

1982-01-01T23:59:59.000Z

33

A Compact Gas Cerenkov Detector with Novel Optics  

E-Print Network (OSTI)

We discuss the design and performance of a threshold Cerenkov counter for identification of charged hadrons. The radiator is pressurized gas, which is contained in thin-walled cylindrical modules. A mirror system of novel design transports Cerenkov photons to photomultiplier tubes. This system is compact, contains relatively little material, and has a large fraction of active volume. A prototype of a module designed for the proposed CLEO III detector has been studied using cosmic rays. Results from these studies show good agreement with a detailed Monte Carlo simulation of the module and indicate that it should achieve separation of pions and kaons at the 2.5-3.0sigma level in the momentum range 0.8-2.8 GeV/c. We predict performance for specific physics analyses using a GEANT-based simulation package.

Michael Sivertz; Bruce Berger; Richard Ehrlich; John Bartlet; Steven Csorna; Vivek Jain; Szabolcs Marka; Kay Kinoshita; Paula Pomianowski

1996-07-31T23:59:59.000Z

34

State Commission electricity regulation under Federal Greenhouse gas cap-and-trade policy  

SciTech Connect

Given the current uncertainty about the timing and severity of greenhouse gas constraints on electric generation that will result from a federal program, commissions need to begin crafting strategies and procedures to best serve the public interest in this new environment. (author)

Keeler, Andrew G.

2008-05-15T23:59:59.000Z

35

Survey of Gas Decontamination Problems at Installations of the Atomic Energy Commission  

SciTech Connect

A survey has been made of gas decontamination problems at the various installations of the Atomic Energy Commission and the results are reported. Installations visited include: The Hanford Engineer Works, Brookhaven National Laboratory, Argonne National Laboratory, Los Alamos Scientific Laboratory, Iowa State College Institute for Nuclear Research, Knolls Laboratory, and installations at Oak Ridge.

Lyon, A.M.

1948-06-03T23:59:59.000Z

36

Available Technologies: JIB-2689 Compact Microchip Gas Sensor  

Natural gas leak detector for residential or commercial buildings; ... Affordable mass production; More energy efficient than current gas sensors ; ...

37

DATA MINING AT THE NEBRASKA OIL & GAS COMMISSION  

Science Conference Proceedings (OSTI)

The purpose of this study of the hearing records is to identify factors that are likely to impact the performance of a waterflood in the Nebraska panhandle. The records consisted of 140 cases. Most of the hearings were held prior to 1980. Many of the records were incomplete, and data believed to be key to estimating waterflood performance such as Dykstra-Parson permeability distribution or relative permeability were absent. New techniques were applied to analyze the sparse, incomplete dataset. When information is available, but not clearly understood, new computational intelligence tools can decipher correlations in the dataset. Fuzzy ranking and neural networks were the tools used to estimate secondary recovery from the Cliff Farms Unit. The hearing records include 30 descriptive entries that could influence the success or failure of a waterflood. Success or failure is defined by the ratio of secondary to primary oil recovery (S/P). Primary recovery is defined as cumulative oil produced at the time of the hearing and secondary recovery is defined as the oil produced since the hearing date. Fuzzy ranking was used to prioritize the relevance of 6 parameters on the outcome of the proposed waterflood. The 6 parameters were universally available in 44 of the case hearings. These 44 cases serve as the database used to correlate the following 6 inputs with the respective S/P. (1) Cumulative Water oil ratio, bbl/bbl; (2) Cumulative Gas oil ratio, mcf/bbl; (3) Unit area, acres; (4) Average Porosity, %; (5) Average Permeability, md; (6) Initial bottom hole pressure, psi. A 6-3-1 architecture describes the neural network used to develop a correlation between the 6 input parameters and their respective S/P. The network trained to a 85% correlation coefficient. The predicted Cliff Farms Unit S/P is 0.315 or secondary recovery is expected to be 102,700 bbl.

James R. Weber

2001-05-01T23:59:59.000Z

38

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

Case Study: Supermarket Commissioning with an Emphasis onNational Conference on Building Commissioning, May 18-20,Building Enclosure Commissioning: What's the Big Deal?"

Mills, Evan

2010-01-01T23:59:59.000Z

39

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

SciTech Connect

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates in

Mills, Evan

2009-07-16T23:59:59.000Z

40

NRRI92-8 NATURAL GAS VEHICLES AND THE ROLE OF STATE PUBLIC SERVICE COMMISSIONS  

E-Print Network (OSTI)

funding provided by participating member commissions of the National Association of Regulatory Utility Commissioners (NARUC). The views and opinions of the authors do not necessarily state or reflect the views, opinions, or policies of the NRRI, the NARUC, or NARUC member commissions. EXECUTIVE SUM:MARY Transportation accounted for about 36 percent of the total net energy consumed in the United States in 1991 with petroleum the overwhelming choice (96 percent) among the various types of fuel. In recent years, the use of petroleum in transportation alone has exceeded domestic petroleum production. Transportation is also a major contributor to the increase in urban air pollution and greenhouse gases. Consequently, the development of vehicles powered by fuels other than petroleum is viewed as a promising approach in enhancing energy security and environmental protection. The focus of this study is to identify state regulatory actions that are conducive to the extensive use of natural gas as a vehicular fuel. This study concludes that natural gas refueling stations should not be regulated as a public utility, that a local distribution company should be allowed to participate in the refueling market only under strict state

Daniel J. Duann; Youssef Hegazy

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

net median commissioning project cost was reduced by 49% oncommissioning project costs and savings. Commissioning isproportional to total project cost. The nature of activities

Mills, Evan

2010-01-01T23:59:59.000Z

42

Commissioning of a magnetic suspension densitometer for high-accuracy density measurements of natural gas mixtures  

E-Print Network (OSTI)

High-accuracy density measurement data are required to validate equations of state (EOS) for use in custody transfer of natural gas through pipelines. The AGA8-DC92 EOS, which is the current industry standard has already been validated against a databank of natural gas mixtures with compositions containing up to 0.2 mole percent of the heavier C6+ fraction and is expected to predict densities of natural gas mixtures containing higher mole percentages of the C6+ fraction with the same accuracy. With the advances in exploration, drilling and production, natural gas streams containing higher percentages of the C6+ fraction have become available from the deepwater and ultra-deepwater Gulf of Mexico in recent years. High-accuracy, density data for such natural gas mixtures are required to check if the AGA8-DC92 EOS covers the entire range of pressure, temperature and compositions encountered in custody transfer. A state-of-the-art, high pressure, high temperature, compact single-sinker magnetic suspension densitometer has been used to measure densities of two simulated natural gas mixtures named M91C1 and M94C1 after validating its operation by measuring densities of pure argon, nitrogen and methane in the range (270 to 340) K [(26.33 to152.33) oF, (-3.15 to 66.85) oC] and (3.447 to 34.474) MPa [(500 to 5,000) psia]. Measured densities of M91C1, not containing the C6+ fraction show larger than expected relative deviations from the AGA8-DC92 EOS predictions in regions 1 and 2 but agree well with predictions from the recently developed REFPROP EOS, implyingthat the AGA8-DC92 EOS may be unreliable in its present state even for natural gas mixtures not containing the C6+ fraction. Measured densities of M94C1 containing more than 0.2 mole percent of the C6+ fraction deviate from the AGA8-DC92 EOS predictions by more than the expected values in region 1 which is not surprising but the agreement with AGA8-DC92 EOS predictions in region 2 is misleading which becomes evident when the measured densities are compared to the REFPROP EOS predictions. The measured data can be used to recalibrate the parameters of the AGA8-DC92 EOS or to validate an entirely new EOS.

Patil, Prashant Vithal

2005-05-01T23:59:59.000Z

43

Red River Compact (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

The Red River Compact Commission administers the Red River Compact to ensure that Texas receives its equitable share of quality water from the Red River and its tributaries as apportioned by the...

44

Dust-to-gas ratio and star formation history of blue compact dwarf galaxies  

E-Print Network (OSTI)

This paper investigates the origin of the observed large variety in dust-to-gas ratio among blue compact dwarf galaxies (BCDs). By applying our chemical evolution model, we find that the dust destruction can largely suppress the dust-to-gas ratio when the metallicity of a BCD reaches $12+\\log{\\rm (O/H)}\\sim 8$, i.e., a typical metallicity level of BCDs. We also show that dust-to-gas ratio is largely varied owing to the change of dust destruction efficiency that has two effects: (i) a significant contribution of Type Ia supernovae to total supernova rate; (ii) variation of gas mass contained in a star-forming region. While mass loss from BCDs was previously thought to be the major cause for the variance of dust-to-gas ratio, we suggest that the other two effects are also important. We finally discuss the intermittent star formation history, which naturally explains the large dispersion of dust-to-gas ratio among BCDs.

H. Hirashita; Y. Y. Tajiri; H. Kamaya

2002-04-18T23:59:59.000Z

45

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

payback time versus building size Project costs and energyPayback time (commissioning cost/annual energy savings) lessenergy payback time of 41 years, while the proper allocation of costs and

Mills, Evan

2010-01-01T23:59:59.000Z

46

OpenEI - Commission  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm4360 en Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records http:en.openei.orgdatasetsnode471...

47

European Commission  

NLE Websites -- All DOE Office Websites (Extended Search)

European Commission European Commission Directorate-General for Energy & Transport Ministry of Industry an Energy of the State of Qatar Gulf Co-operation Council Secretariat General EU-GCC Seminar: "Natural Gas Technologies - Realities & Prospects" Doha, Qatar, 7-8 February 2005 STREAM B: "Advanced Technologies for Power Generation through Natural Gas & Desalination" SESSION B.3: STATE OF THE ART OF COMBINED CYCLE PLANT Michael VOLLMER, Head of Combined Cycle Power Plant Development, ALSTOM Power Turbo-Systems February 2005 February 2005 Power Turbo-Systems State Of The Art Combined Cycle Power Plants Michael Vollmer 2 ALSTOM (Switzerland)Ltd© 2005. Preliminary/for discussion purposes only. We reserve all rights in this document and in the information

48

Commission | OpenEI  

Open Energy Info (EERE)

57 57 Varnish cache server Commission Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

49

A New Compact Cryogenic Air Sampler and Its Application in Stratospheric Greenhouse Gas Observation at Syowa Station, Antarctica  

Science Conference Proceedings (OSTI)

To collect stratospheric air samples for greenhouse gas measurements, a compact cryogenic air sampler has been developed using a cooling device called the JouleThomson (JT) minicooler. The JT minicooler can produce liquefied neon within 5 s ...

Shinji Morimoto; Takashi Yamanouchi; Hideyuki Honda; Issei Iijima; Tetsuya Yoshida; Shuji Aoki; Takakiyo Nakazawa; Shigeyuki Ishidoya; Satoshi Sugawara

2009-10-01T23:59:59.000Z

50

Abart CDS - a New Compact Multi-pollutant Pot Gas and Alumina ...  

Science Conference Proceedings (OSTI)

Abstract Scope, A new modular Abart CDS is developed that integrates silos, alumina handling, heat exchangers, fans, SO2 scrubber and stack into a compact

51

Southeast Interstate Low-Level Radioactive Waste Management Compact (multi-state)  

Energy.gov (U.S. Department of Energy (DOE))

The Southeast Interstate Low-Level Radioactive Waste Management Compact is administered by the Compact Commission. The Compact provides for rotating responsibility for the region's low-level...

52

Design of compact intermediate heat exchangers for gas cooled fast reactors  

E-Print Network (OSTI)

Two aspects of an intermediate heat exchanger (IHX) for GFR service have been investigated: (1) the intrinsic characteristics of the proposed compact printed circuit heat exchanger (PCHE); and (2) a specific design optimizing ...

Gezelius, Knut, 1978-

2004-01-01T23:59:59.000Z

53

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

aspects of energy industry supply, production, transportation, delivery and distribution, demand CALIFORNIA ENERGY COMMISSION SCENARIO-BASED ASSESSMENT OF RESOURCE PLANS PREDICATED Integrated Energy Policy Report #12;CALIFORNIA ENERGY COMMISSION Michael R. Jaske Principal Author Global

54

Experimental Evaluation of SI Engine Operation Supplemented by Hydrogen Rich Gas from a Compact Plasma Boosted Reformer  

DOE Green Energy (OSTI)

It is well known that hydrogen addition to spark-ignited (SI) engines can reduce exhaust emissions and increase efficiency. Micro plasmatron fuel converters can be used for onboard generation of hydrogen-rich gas by partial oxidation of a wide range of fuels. These plasma-boosted microreformers are compact, rugged, and provide rapid response. With hydrogen supplement to the main fuel, SI engines can run very lean resulting in a large reduction in nitrogen oxides (NO x ) emissions relative to stoichiometric combustion without a catalytic converter. This paper presents experimental results from a microplasmatron fuel converter operating under variable oxygen to carbon ratios. Tests have also been carried out to evaluate the effect of the addition of a microplasmatron fuel converter generated gas in a 1995 2.3-L four-cylinder SI production engine. The tests were performed with and without hydrogen-rich gas produced by the plasma boosted fuel converter with gasoline. A one hundred fold reduction in NO x due to very lean operation was obtained under certain conditions. An advantage of onboard plasma-boosted generation of hydrogen-rich gas is that it is used only when required and can be readily turned on and off. Substantial NO x reduction should also be obtainable by heavy exhaust gas recirculation (EGR) facilitated by use of hydrogen-rich gas with stoichiometric operation.

J. B. Green, Jr.; N. Domingo; J. M. E. Storey; R.M. Wagner; J.S. Armfield; L. Bromberg; D. R. Cohn; A. Rabinovich; N. Alexeev

2000-06-19T23:59:59.000Z

55

Interstate Mining Compact (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Interstate Mining Compact (Maryland) Interstate Mining Compact (Maryland) < Back Eligibility Commercial Developer Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Maryland Program Type Environmental Regulations Provider Interstate Mining Compact Commission This legislation authorizes the state's entrance into the Interstate Mining Compact, a multi-state governmental agency / organization that represents the natural resource and related environmental protection interests of its member states. Currently, 23 states are members to the compact, and 6 additional states are associate members. The compact is administered by the Interstate Mining Compact Commission, which does not possess regulatory

56

Energy Commission  

E-Print Network (OSTI)

This report was prepared as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees or the State of California. The Energy Commission, the State of California, its employees, contractors and subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the uses of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the California Energy Commission nor has the California Energy Commission passed upon the accuracy or adequacy of the information in this report. ii ACKNOWLEDGMENTS

Larry Waterland; M. Lorraine White; James J. Folkman; Ray Tuvell; Rosella Shapiro; B. B Blevins; Larry Waterl; Stefan Unnasch; Michael Jackson; M. Lorraine White; James M. Folkman; Sherry Stoner; Mckinley Addy; Asish Gautam; Tom Macdonald; Mike Mccormack; Tim Olson; Peter Quinliven

2006-01-01T23:59:59.000Z

57

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO  

E-Print Network (OSTI)

Commission's system for tracking and verifying compliance with the RPS. Keywords biodiesel, biogas, biomass of biomass or biogas fuels. In addition, Section 399.12, Subdivision (g)(3), specifies that no electricity that uses a mix of natural gas and biogas injected into a gas transportation pipeline. Once WREGIS

58

Expanding the operational envelope of compact cylindrical cyclone gas/liquid separators using a variable inlet-slot configuration  

E-Print Network (OSTI)

Despite the numerous advantages associated with using compact cylindrical cyclone gas/liquid separators, particularly for upstream production operations, the lack of a full understanding of the complex hydrodynamic process taking place in it and its ?unfamiliarity? to oil field personnel has hindered its widespread use. The complexity associated with this technology is attributed to two limiting physical phenomena, liquid carry-over and gas carryunder. While a lot of work has been done to better understand and predict the liquid carry-over operational envelope, little or no information about methods capable of adequately predicting or characterizing the gas carry-under performance of such separators is available. Traditionally, to mitigate the gas carry-under phenomena, the use of complex control algorithms and systems has been employed. These systems make the technology expensive (as opposed to the potential cost reduction it promises) and impractical for realistic use in the oil field where reliability is of critical importance. A simpler solution, the use of changeable or adjustable inlet-slots that regulate the artificial gravity environment created in the separator, could significantly improve the gas carry-under performance of cylindrical cyclone separators. This research has focused primarily on the use of adjustable inlet-slots. Theoretical analysis and experimental data investigating the benefits of variable inlet geometry have been provided. This work lays the foundation or validation required to perform more tests on a field-scale version to verify the results presented here. A modular design of such a variable inlet-slot inletsection has the potential of simplifying the design and specifications of cylindrical cyclone gas/liquid separators. From the results of this investigation, it was found that the gas carry-under performance of a cylindrical cyclone gas/liquid separator could be improved considerably over a wider range of operating conditions by adjusting the size of the inlet-slots. This contradicts earlier reports of liquid carry-over improvement in separator performance. Also, for the first time, a simple method for theoretically analyzing the percent improvement in separator gas carry-under performance using the optimum g-force concept is presented. This method could be incorporated into design software for determining the slot-size configuration required for varying separator-operating conditions.

Uvwo, Ighofasan

2004-12-01T23:59:59.000Z

59

Development of a technology of compaction of increased-density parts using gas drainage methods  

Science Conference Proceedings (OSTI)

The influence of the amount and dispersion of technological lubricant (zinc stearate) and solid lubricants (talc, graphite, calcium fluoride) as well as the sintering temperature and time on the physical and mechanical properties of sintered iron is studied. When the stock contains no technological lubricant the porosity of the specimens drops to 5.0-5.2% but their strength is substantially greater than that of SP10 and SP30 steels of the same porosity. The strength of the specimens is highest when the iron powder has the smallest grain size. Solid lubricants in the stock result in the pressed iron-powder parts having poorer mechanical properties, although they do act in part as technological lubricants during compaction. Favorable results may be obtained by complex alloying of the stock, i.e., the simultaneous introduction of several solid lubricants.

Mamedov, A.T. [Scientific-Industrial Firm Bakkonditsioner, Baku (Russian Federation)

1995-03-01T23:59:59.000Z

60

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

with California's coastal power plant fleet; 3) biological resource issues associated with solar thermal.......................................................................23 CHAPTER 3: Cooling Water Use at New Power Plants Subject to Energy Commission Jurisdiction Cooling Water Trends for California Power Plants

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Guidelines for residential commissioning  

E-Print Network (OSTI)

Potential Benefits of Commissioning California Homes.Delp. 2000. Residential Commissioning: A Review of Relatedfor Evaluating Residential Commissioning Metrics Lawrence

Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

2003-01-01T23:59:59.000Z

62

High-accuracy P-p-T measurements of pure gas and natural gas like mixtures using a compact magnetic suspension densimeter  

E-Print Network (OSTI)

Highly accurate data for density measurements are required for engineering calculations as well for developing equations of state (EOS) for use in the custody transfer of natural gas through pipelines. The widely used present industry standard, the AGA8-DC92 EOS, was developed against a database of reference quality natural gas mixtures with compositions containing less than 0.2 mole percent of the heavier C6+ fraction. With the advances in technology in the late nineties, it is possible to produce gas from deep and ultra-deepwater of the Gulf of Mexico where the pressures and temperatures encountered are much higher. Produced gas mixtures have compositions containing higher percentages of the C6+ fraction. As AGA8-DC92 is a statistical fit equation developed for one set of conditions, time has come to evaluate its performance to assess whether it is still viable for gas custody transfer with a new set of conditions encountered. A highly accurate, high pressure and temperature, compact single sinker magnetic suspension densimeter has been used first to determine densities of pure componentâ??s densities for which very reliable data are available. After validating its performance, the densities of four light natural gas mixtures, containing no C6+ fraction and two heavy gas mixtures containing more than 0.2 mole percent of the heavier C6+ fraction, were measured. The light mixtures were measured in the temperature range of 250 to 450 K and in the pressure range of 10 to 150 Mpa (1450 to 21,750 psi); the heavy mixtures were measured in the range of 270 to 340 K and in the pressure range of 3.45 to 34.45 MPa (500 to 5,000 psi). Out of those, the data of only two light natural gas mixtures have been presented in the dissertation. Data on two heavy mixtures have not been published due to reasons of confidentiality. Measured densities of light mixtures, not containing the C6+ fraction show less than expected relative deviations from the AGA8-DC92 EOS predictions except at low temperature. The deviation with the recently developed GERG02 EOS was more pronounced. A force transmission error analysis and uncertainty analysis was carried out. The total uncertainty was calculated to be 0.105 %. The data measured as a part of this research should be used as reference quality data either to modify the parameters of AGA8-DC92 EOS or develop a more reliable equation of state with wider ranges of pressure and temperature.

Ejaz, Saquib

2003-05-01T23:59:59.000Z

63

California Energy Commission COMMISSION REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity resource. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CMF. #12;ii #12;iii) ................................................................ 20 Supply Form S2: Energy Balance Table

64

Design and Development of Gas-Liquid Cylindrical Cyclone Compact Separators for Three-Phase Flow  

SciTech Connect

The objective of this five-year project (October, 1997--September, 2002) is to expand the current research activities of Tulsa University Separation Technology Projects (TUSTP) to multiphase oil/water/gas separation. This project will be executed in two phases. Phase I (1997--2000) will focus on the investigations of the complex multiphase hydrodynamic flow behavior in a three-phase Gas-Liquid Cylindrical Cyclone (GLCC) Separator. The activities of this phase will include the development of a mechanistic model, a computational fluid dynamics (CFD) simulator, and detailed experimentation on the three-phase GLCC. The experimental and CFD simulation results will be suitably integrated with the mechanistic model. In Phase II (2000--2002), the developed GLCC separator will be tested under high pressure and real crudes conditions. This is crucial for validating the GLCC design for field application and facilitating easy and rapid technology deployment. Design criteria for industrial applications will be developed based on these results and will be incorporated into the mechanistic model by TUSTP.

Mohan, Ram S.; Shoham, Ovadia

1999-10-28T23:59:59.000Z

65

Design and Development of Gas-Liquid Cylindrical Cyclone Compact Separators for Three-Phase Flow  

SciTech Connect

The objective of this five-year project (October 1997--September 2002) was to expand the current research activities of Tulsa University Separation Technology Projects (TUSTP) to multiphase oil/water/gas separation. This project was executed in two phases. Phase I (1997--2000) focused on the investigations of the complex multiphase hydrodynamic flow behavior in a three-phase Gas-Liquid Cylindrical Cyclone (GLCC) Separator. The activities of this phase included the development of a mechanistic model, a computational fluid dynamics (CFD) simulator, and detailed experimentation on the three-phase GLCC. The experimental and CFD simulation results will be suitably integrated with the mechanistic model. In Phase II (2000--2002), the developed GLCC separator will be tested under high pressure and real crude conditions. This is crucial for validating the GLCC design for field application and facilitating easy and rapid technology deployment. Design criteria for industrial applications will be developed based on these results and will be incorporated into the mechanistic model by TUSTP.

Mohan, R.S.; Shoham, O.

2001-01-10T23:59:59.000Z

66

California Energy Commission FINAL COMMISSION REPORT  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Sixth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor AUGUST 2012 CEC3002012006CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN J. DOUGLAS, J

67

Simulations of Methane Hydrate Phenomena Over Geologic Timescales. Part I: Effect of Sediment Compaction Rates on Methans Hydrate and Free Gas Accumulation  

Science Conference Proceedings (OSTI)

The focus of this work is a model that describes migration and biogenic formation of methane under conditions representative of dynamic marine basins, and the conversion of soluble methane into either solid hydrate or exsolved gas. Incorporated into the overall model are an accurate phase equilibria model for seawater-methane, a methane source term based on biogenesis data, and a sediment compaction model based on porosity as a function of position, time, and the local volume fractions of hydrate solids and free gas. Simulations have shown that under some compaction scenarios, liquid overpressures reach the lithostatic limit due to permeability constraints, which can diminish the advective transfer of soluble methane within the porous sediment. As such, the formation of methane hydrate can be somewhat of a self-moderating process. The occurrence and magnitude of hydrate formation is directly tied to fundamental parameters such as the compaction/sedimentation rates, liquid advection rates, seafloor depth, geothermal gradient, etc. Results are shown for simulations covering 20 million years, wherein growth profiles for methane hydrate and free gas (neither exceeding 10 vol% at any location) are tracked within a vertical sediment column spanning over 3000 m. A case study is also presented for the Blake Ridge region (Ocean Drilling Program Leg 164, Sites 994, 995, and 997) based on simulations covering 6 Ma, wherein it is concluded that methane migration from compaction-driven advection may account for 15-30% of the total hydrate mass present in this region.

Gering, Kevin Leslie

2003-01-01T23:59:59.000Z

68

Canadian River Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canadian River Compact (Texas) Canadian River Compact (Texas) Canadian River Compact (Texas) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Canadian River Compact Commission The Canadian River Commission administers the Canadian River Compact which includes the states of New Mexico, Oklahoma, and Texas. Signed in 1950 by

69

SPEAR3 | Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

list (updated 060605) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt) Commissioning Schedule(.mpp) Run Schedule...

70

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.on a support structure, and commissioning of the RFQ. Theabout 1.0 dB. BEAM COMMISSIONING RESULTS Beam commissioning

2002-01-01T23:59:59.000Z

71

Hutchinson Utilities Commission - Residential Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hutchinson Utilities Commission - Residential Energy Efficiency Hutchinson Utilities Commission - Residential Energy Efficiency Program Hutchinson Utilities Commission - Residential Energy Efficiency Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Water Heating Maximum Rebate 500 Program Info Expiration Date program offered until expiration of funding State Minnesota Program Type Utility Rebate Program Rebate Amount Natural Gas Furnaces: $150-$250, depending on efficiency Natural Gas Furnace Tune-up: $25 ECM Motor: $75 Natural Gas Boilers: $200 Central Air Conditioners: $250 Central Air Conditioner Tune-up: $25 Tankless Gas Water Heaters: $150 Storage Gas Water Heaters: $50 Air Source Heat Pumps: $75/ton

72

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

the state board to adopt a schedule of fees to be paid by regulated sources of greenhouse gas emissions compliance schedule, alternative control technology, a process change, or a product substitution. (c) "Carbon sources or categories of sources, subject to the criteria and schedules set forth in this part. #12;Text

73

Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Commissioning Commissioning October 16, 2013 - 4:43pm Addthis Project Construction Commissioning Operations & Maintenance Commissioning renewable energy for new construction projects and major renovations requires special consideration in selecting the commissioning agent and team, developing the specifications, conducting the full commissioning process, and integrating measurement and verification (M&V) systems. Commissioning can reduce overall costs related to construction deficiencies and ensure more efficient building and systems operation. For new construction projects or major renovations with renewable energy systems, commissioning is critical to the ultimate goal of operating all building systems as safely, optimally, and efficiently as their designers intended.

74

California Energy Commission DRAFT COMMISSION REPORT  

E-Print Network (OSTI)

Via E-Filing RE: Klamath Hydroelectric Project (FERC Project No. 2082). California Energy Commission COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov April 19, 2007 Ms. Philis Posey Acting Secretary Federal Energy Regulatory Commission 888 First Street NE ­ Room 1A Washington, DC 20246

75

VIBRATION COMPACTION  

DOE Patents (OSTI)

A method of compacting a powder in a metal container is described including the steps of vibrating the container at above and below the resonant frequency and also sweeping the frequency of vibration across the resonant frequency several times thereby following the change in resonant frequency caused by compaction of the powder. (AEC)

Hauth, J.J.

1962-07-01T23:59:59.000Z

76

River Basin Commissions (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

77

Hydrodynamics of high-redshift galaxy collisions: From gas-rich disks to dispersion-dominated mergers and compact spheroids  

E-Print Network (OSTI)

Disk galaxies at high redshift (z~2) are characterized by high fractions of cold gas, strong turbulence, and giant star-forming clumps. Major mergers should typically involve such galaxies. High-redshift merger simulations, however, have always modeled the ISM as stable, homogeneous, and thermally pressurized. We present the first high-redshift merger simulations with cold, turbulent, and clumpy gas, and we discuss the major new features of these models compared to models where the gas is artificially stabilized and warmed. Gas turbulence, which is already strong in high-redshift disks, is further enhanced in mergers. Some phases are dispersion-dominated, with most of the gas kinetic energy in the form of velocity dispersion and very chaotic velocity fields, unlike low-redshift mergers. High-redshift mergers are also characterized by highly dissipative gas collapse to the center of mass, with the stellar component following in a global contraction. The final galaxies are early-type with relatively small radii...

Bournaud, Frederic; Delaye, Lauriane; Powell, Leila C; Elmegreen, Bruce G; Elmegreen, Debra Meloy; Duc, Pierre-Alain; Teyssier, Romain; Contini, Thierry; Epinat, Benoit; Shapiro, Kristen L

2010-01-01T23:59:59.000Z

78

Delaware River Basin Commission (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

79

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning to someone by E-mail Share Federal Energy Management Program: Commissioning on Facebook Tweet about Federal Energy Management Program: Commissioning on Twitter...

80

Compact accelerator  

DOE Patents (OSTI)

A compact linear accelerator having at least one strip-shaped Blumlein module which guides a propagating wavefront between first and second ends and controls the output pulse at the second end. Each Blumlein module has first, second, and third planar conductor strips, with a first dielectric strip between the first and second conductor strips, and a second dielectric strip between the second and third conductor strips. Additionally, the compact linear accelerator includes a high voltage power supply connected to charge the second conductor strip to a high potential, and a switch for switching the high potential in the second conductor strip to at least one of the first and third conductor strips so as to initiate a propagating reverse polarity wavefront(s) in the corresponding dielectric strip(s).

Caporaso, George J. (Livermore, CA); Sampayan, Stephen E. (Manteca, CA); Kirbie, Hugh C. (Los Alamos, NM)

2007-02-06T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Retro-Commissioning (RCx)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Retro-Commissioning (RCx) FUPWG Meeting 20 October, 2010 RCx In UESC Contracts  Put RCx in Delivery Orders  Clear Scope of Work  Specify kW per Ton on Completion  State the Current Condition of the Equipment  State the Expected Performance in the Delivery Orders and Get the Contractor to Agree Up-Front  Don't Hire a Contractor that has Never Done Commissioning  Hire a Commissioning Agent  This Can Be Expensive What We Do at SCE  We Commission Everything  We ReCommission Everything to Some Degree  San Bernardino Story Up Front  You must review and approve the construction scope, budget, and schedule including all RCx activities BEFORE work begins at site  Use Pre-Established Guidelines (FEMP

82

Sabine River Compact (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sabine River Compact (Multiple States) Sabine River Compact (Multiple States) Sabine River Compact (Multiple States) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Texas Program Type Siting and Permitting Provider Sabine River Compact Commission The Sabine River Compact Commission administers the Sabine River Compact to ensure that Texas receives its equitable share of quality water from the

83

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Process Commissioning Process October 16, 2013 - 4:44pm Addthis The commissioning process is designed to verify that a renewable energy project meets specified agency design, performance, and operational requirements. To ensure that the level and focus of commissioning efforts are appropriate to the scope and complexity of the project, the commissioning planning process should begin at the same time as the design phase of the project. Integrating Commissioning Into the Design Process Developing a Detailed Commissioning Plan Testing Systems and Providing Commissioning Reports Performing Enhanced Commissioning Delivering Final Documentation Integrating Commissioning Into the Design Process The commissioning agent should attend design team meetings, review the

84

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO  

E-Print Network (OSTI)

, digester gas, electrolysis, eligibility, fuel cell, gasification, geothermal, hydrogen, landfill gas

85

The LHCB Commissioning  

E-Print Network (OSTI)

The LHCb experiment is dedicated to precision measurements of CP violation and rare decays of B hadrons at the Large Hadron Collider (LHC) at CERN. The LHCb installation has been finished in spring 2008 and an intensive testing and commissioning of the system has been started. An overview and the results from our commissioning activities are described.

Stefano de Capua; for the LHCb collaboration

2009-04-28T23:59:59.000Z

86

Commissioning for Federal Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

87

Commissioning for Federal Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

88

Prediction of reservoir compaction and surface subsidence  

SciTech Connect

A new loading-rate-dependent compaction model for unconsolidated clastic reservoirs is presented that considerably improves the accuracy of predicting reservoir rock compaction and surface subsidence resulting from pressure depletion in oil and gas fields. The model has been developed on the basis of extensive laboratory studies and can be derived from a theory relating compaction to time-dependent intergranular friction. The procedure for calculating reservoir compaction from laboratory measurements with the new model is outlined. Both field and laboratory compaction behaviors appear to be described by one single normalized, nonlinear compaction curve. With the new model, the large discrepancies usually observed between predictions based on linear compaction models and actual (nonlinear) field behavior can be explained.

De Waal, J.A.; Smits, R.M.M.

1988-06-01T23:59:59.000Z

89

FODO-Supercell Based Compact Ring Design with Tunable Momentum Compaction and Optimized Dynamic Aperture  

Science Conference Proceedings (OSTI)

A storage ring with tunable momentum compaction has the advantage in achieving different RMS bunch length with similar RF capacity, which is potentially useful for many applications, such as linear collider damping ring and predamping ring where injected beam has a large energy spread and a large transverse emittance. A tunable bunch length also makes the commissioning and fine tuning easier in manipulating the single bunch instabilities. In this paper, a compact ring design based on a supercell is presented, which achieves a tunable momentum compaction while maintaining a large dynamic aperture.

Sun, Yipeng; /SLAC

2012-05-03T23:59:59.000Z

90

FODO-Supercell Based Compact Ring Design with Tunable Momentum Compaction and Optimized Dynamic Aperture  

Science Conference Proceedings (OSTI)

A storage ring with tunable momentum compaction has the advantage in achieving different RMS bunch length with similar RF capacity, which is potentially useful for many applications, such as linear collider damping ring and pre-damping ring where injected beam has a large energy spread and a large transverse emittance. A tunable bunch length also makes the commissioning and fine tuning easier in manipulating the single bunch instabilities. In this paper, a compact ring design based on a supercell is presented, which achieves a tunable momentum compaction while maintaining a large dynamic aperture.

Sun, Yipeng; /SLAC

2012-05-11T23:59:59.000Z

91

NUCLEAR REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 21, 1999 (Volume 64, Number 244)] December 21, 1999 (Volume 64, Number 244)] [Proposed Rules] [Page 71331-71333] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21de99-21] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: Nuclear Regulatory Commission. ACTION: Advance notice of proposed rulemaking. ----------------------------------------------------------------------- SUMMARY: The Nuclear Regulatory Commission (NRC) is considering an amendment to its regulations that would require NRC licensees to notify

92

Automated Demand Response and Commissioning  

E-Print Network (OSTI)

Conference on Building Commissioning: May 4-6, 2005 Motegi,National Conference on Building Commissioning: May 4-6, 2005Demand Response and Commissioning Mary Ann Piette, David S.

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

93

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2010 ELECTRICITY SUPPLY AND DEMAND OUTLOOK MAY Supply and Demand Outlook provides a summary of the California Energy Commission staff assessment. Summer 2010 Electricity Supply and Demand Outlook. California Energy Commission, Electricity Supply

94

Pecos River Compact (Texas)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation authorizes the state's entrance into the Pecos River Compact, a joint agreement between the states of New Mexico and Texas. The compact is administered by the Pecos River Compact...

95

The California Sentencing Commission  

E-Print Network (OSTI)

The California Sentencing Commission: Laying the Groundwork Sponsored by The Stanford Executive alexander, Executive Vice President, California Correctional and Peace Officers Association Laura appleman Project, The Pew Charitable Trusts Joyce Hayhoe, Assistant Secretary, Office of Legislation, California

Ford, James

96

Codex Alimentarius Commission update  

Science Conference Proceedings (OSTI)

AOCS Technical Director Richard Cantrill attended recent meetings of two Codex Alimentarius Commission (Codex) committees that deal with issues of interest to the fats and oils industry. Topics discussed included work to update the standard on named vegeta

97

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.Spallation Neutron Source (SNS ** ) project a 402.5 MHz RFQR. Keller et al, Status of the SNS Font End Systems, Proc.

2002-01-01T23:59:59.000Z

98

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1994-03-01T23:59:59.000Z

99

Southwestern Low-Level Radioactive Waste Disposal Compact (South Dakota) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Low-Level Radioactive Waste Disposal Compact (South Southwestern Low-Level Radioactive Waste Disposal Compact (South Dakota) Southwestern Low-Level Radioactive Waste Disposal Compact (South Dakota) < Back Eligibility Utility Investor-Owned Utility Industrial Construction Municipal/Public Utility Rural Electric Cooperative Fuel Distributor Program Info State South Dakota Program Type Siting and Permitting Provider Southwestern Low-Level Radioactive Waste Commission This legislation authorizes the state's entrance into the Southwestern Low-Level Radioactive Waste Disposal Compact, which provides for the cooperative management of low-level radioactive waste. The Compact is administered by a commission, which can regulate and impose fees on in-state radioactive waste generators. The states of Arizona, California,

100

Chapter 9: Commissioning the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com- plexity of building systems constructed today, commis- sioning is necessary, but not automatically included as part of the typical design and contracting process. Commissioning is critical for ensuring that the building design is successfully constructed and operated.

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Automated Demand Response and Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Commissioning Title Automated Demand Response and Commissioning Publication Type Conference Paper LBNL Report Number LBNL-57384 Year of Publication 2005 Authors Piette, Mary...

102

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

commissioning projects. Commissioning training is also available through FEMP. The on-demand training outlines processes to resolve operating problems, improve comfort,...

103

Observation of CH4 and other Non-CO2 Green House Gas Emissions from California  

E-Print Network (OSTI)

Sinks 1990 to 2004. California Energy Commission (Report #Gas Inventory Methods. California Energy Commission: Publicand Sinks: 1990-1999. California Energy Commission: Public

Fischer, Marc L.

2009-01-01T23:59:59.000Z

104

California Energy Commission Pipeline Integrity Technology  

E-Print Network (OSTI)

California Energy Commission Pipeline Integrity Technology Demonstration Grant California Energy Solicitation Scope · The purpose of this solicitation is to demonstrate natural gas pipeline inspection using low cost/low power sensors ­ Improvement of existing pipeline inspection technology to identify

105

INITIAL COMMISSIONING OF NDCX-II  

E-Print Network (OSTI)

INITIAL COMMISSIONING OF NDCX-II* S. Lidia # , D. Arbelaez,the results of early commissioning studies that characterizeschematic and commissioning phases. The commissioning phases

Lidia, S.

2013-01-01T23:59:59.000Z

106

Colorado Public Utility Commission's Xcel Wind Decision  

DOE Green Energy (OSTI)

In early 2001 the Colorado Public Utility Commission ordered Xcel Energy to undertake good faith negotiations for a wind plant as part of the utility's integrated resource plan. This paper summarizes the key points of the PUC decision, which addressed the wind plant's projected impact on generation cost and ancillary services. The PUC concluded that the wind plant would cost less than new gas-fired generation under reasonable gas cost projections.

Lehr, R. L. (NRUC/NWCC); Nielsen, J. (Land and Water Fund of the Rockies); Andrews, S.; Milligan, M. (National Renewable Energy Laboratory)

2001-09-20T23:59:59.000Z

107

An Innovative Compact Heat Exchanger Solution for Aluminium Off ...  

Science Conference Proceedings (OSTI)

Presentation Title, An Innovative Compact Heat Exchanger Solution for Aluminium Off-Gas Cooling and Heat Recovery. Author(s), El Hani Bouhabila, Erling...

108

Status and Commissioning of the CMS Experiment  

E-Print Network (OSTI)

After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction and installation is described in the first part of the note. The second part of the document is devoted to a discussion of the general commissioning strategy of the CMS experiment, with a particular emphasis on trigger, calibration and alignment. Aspects of b-physics, as well as examples for early physics with CMS are also presented. CMS will be ready for data taking in time for the first collisions in the Large Hadron Collider (LHC) at CERN in late 2007.

O. Buchmueller; F. -P. Schilling

2007-01-11T23:59:59.000Z

109

Commissioning Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Team Commissioning Team Commissioning Team October 16, 2013 - 4:45pm Addthis Assembling a committed team is a critical part of the commissioning process for renewable energy projects. Members of the team vary based on the size, complexity, and funding mechanism used for the project at hand. The commissioning team lead is a commissioning agent, an independent agent representing the agency's interests. In addition to the commissioning agent, participants in the commissioning process can include the agency, operations and management (O&M) personnel, contractors, subcontractors, and the architectural and engineering (A&E) firm. The project energy lead should also be an active member of the commissioning team and work closely with the commissioning agent. Renewable energy projects often require a team of experts in specific

110

ATF2 Commissioning  

Science Conference Proceedings (OSTI)

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

2009-10-30T23:59:59.000Z

111

Commissioning Guidance for ESPCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.2 7.2 Commissioning Guide Commissioning Guidance for ESPCs INTRODUCTION Federal facility managers are challenged daily with maintaining existing federal building stock that is energy inefficient, requires increasing operations and maintenance (O&M) expenses, and often does not achieve the building occupant comfort needed to maintain worker productivity. Additionally, they are faced with congressionally mandated requirements to reduce energy use and O&M expenses, with little capital funding. The Super ESPC program provides a procurement mechanism to allow agencies to acquire performance-based services to implement energy efficient equipment and systems that reduce energy use and O&M expenses through projects designed, installed, financed, and

112

ATLAS Muon Detector Commissioning  

E-Print Network (OSTI)

The ATLAS muon spectrometer consists of several major components: Monitored Drift Tubes (MDTs) for precision measurements in the bending plane of the muons, supplemented by Cathode Strip Chambers (CSC) in the high eta region; Resistive Plate Chambers (RPCs) and Thin Gap Chambers (TGCs) for trigger and second coordinate measurement in the barrel and endcap regions, respectively; an optical alignment system to track the relative positions of all chambers; and, finally, the world's largest air-core magnetic toroid system. We will describe the status and commissioning of the muon system with cosmic rays and plans for commissioning with early beams.

E. Diehl; for the ATLAS muon collaboration

2009-10-15T23:59:59.000Z

113

Nuclear Regulatory Commission issuances  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-11-01T23:59:59.000Z

114

California Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 505 Van Ness Avenue Place San Francisco, California Zip 94102 Phone number 415-703-2782 Website http://www.cpuc.ca.gov/puc/ References CPUC Website[1] This article is a stub. You can help OpenEI by expanding it. California Public Utilities Commission is an organization based in San Francisco, California. The CPUC regulates privately owned electric, natural gas, telecommunications, water, railroad, rail transit, and passenger transportation companies, in addition to authorizing video franchises. Our five Governor-appointed Commissioners, as well as our staff, are dedicated to ensuring that consumers have safe, reliable utility service at reasonable rates, protecting against fraud, and promoting the health of California's economy.

115

Atlantic Interstate Low-Level Radioactive Waste Management Compact (South  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atlantic Interstate Low-Level Radioactive Waste Management Compact Atlantic Interstate Low-Level Radioactive Waste Management Compact (South Carolina) Atlantic Interstate Low-Level Radioactive Waste Management Compact (South Carolina) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Program Info Start Date 1986 State South Carolina Program Type Environmental Regulations Siting and Permitting Provider Atlantic Compact Commission The Atlantic (Northeast) Interstate Low-Level Radioactive Waste Management Compact is a cooperative effort to plan, regulate, and administer the disposal of low-level radioactive waste in the region. The states of Connecticut, New Jersey, and South Carolina are party to this compact

116

The Optimal Gas Tax for California  

E-Print Network (OSTI)

Parsing California Gas Prices. http://www.law.stanford.edu/in California Real gas price ( $/gallon) Taxable gasolineEnergy Commission (gas price), California State Board of

Lin, C.-Y. Cynthia; Prince, Lea

2010-01-01T23:59:59.000Z

117

February 2008 In 2003, the California Public Utilities Commission, the California Energy Commission, and the California  

E-Print Network (OSTI)

prepared the update using the information and analysis prepared for the recent IEPR, as well as recent· Renewable energy· Electricity reliability and infrastructure· Electricity market structure· Natural gas#12;February 2008 In 2003, the California Public Utilities Commission, the California Energy

118

New Forestry Commission District Office The new Forestry Commission  

E-Print Network (OSTI)

New Forestry Commission District Office The new Forestry Commission District office at Smithton in construction The Forestry Commission's District office at Smithton in Inverness, Scotland, covers the national fuel heating system has proved effective during the winter of 2009/10, one of the harshest in 40 years

119

Commissioning : The Total Process  

E-Print Network (OSTI)

In recent years, most new buildings have been equipped with increasingly sophisticated heating, ventilating, and air-conditioning (HVAC) systems, energy conservation equipment, lighting systems, security systems, and environmental control devices that rely on electronic control. Very frequently these systems and design features have not performed as expected. This can result in energy-efficiency losses. occupant complaints about comfort, indoor air quality problems. high operating costs, and increased liability for building owners, operators, employers, and design professionals. Building commissioning was developed in response to these concerns. Commissioning involves the examining and testing of building systems to verify aspects of the building design, ensure that the building is constructed in accordance with the contract documents, and verify that the building and its systems function according to the design intent documents. The process helps to integrate and organize the design, construction, operations, and maintenance of a building's systems to produce a healthy, comfortable, and efficient facility.

Kettler, G. J.

1998-01-01T23:59:59.000Z

120

BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION OF THE STATE OF CALIFORNIA  

E-Print Network (OSTI)

PROJECT (82-AFC-2C) Staff Analysis of Proposed Modifications to Operate the Combustion Gas Turbine Units River Cogeneration Company filed a petition with the California Energy Commission (Energy Commission) to amend the Energy Commission's Final Decision for the Kern River Cogeneration project. Staff prepared

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Plants and Dirt Compaction  

NLE Websites -- All DOE Office Websites (Extended Search)

Dirt Compaction Name: Conor Location: NA Country: NA Date: NA Question: When growing corn and soybean plants does the compaction of dirt effect the growth of the plant? Replies:...

122

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

NONE

1996-04-01T23:59:59.000Z

123

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Manager Renewable Energy Office G. William Pennington Acting Deputy Director Efficiency and Renewable of how the Energy Commission's Renewable Energy Program is administered and outlines terms

124

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2012 ELECTRICITY SUPPLY ABSTRACT The Summer 2012 Electricity Supply and Demand Outlook is the California Energy and Demand Outlook. California Energy Commission, Electricity Supply Analysis Division. CEC-200

125

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

126

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

127

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 OAS-L-13-01 November 2012 Department of Energy Washington, DC 20585 November 7, 2012 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy responsible for, among other things, regulating interstate transmission of the Nation's electricity, natural gas and oil. In addition, the Commission licenses and inspects private, municipal and state hydroelectric projects. To achieve its mission, the Commission relies

128

TATE OF CALIFORNI ENERGY COMMISSION  

E-Print Network (OSTI)

of concentrator photovoltaic systems must provide acceptable evidence to the Energy Commission for each modelS TATE OF CALIFORNI A ENERGY COMMISSION Pete Wilson, Governor CALIFORNIA ENERGY COMMISSION January Charles Mizutani, Manager TECHNOLOGY EVALULATION OFFICE Nancy J. Deller, Deputy Director ENERGY TECHNOLOGY

129

High accuracy p-rho-t measurements up to 200 MPa between 200 K and 500 K using a compact single sinker magnetic suspension densimeter for pure and natural gas like mixtures  

E-Print Network (OSTI)

Highly accurate density data is required for engineering calculations to make property estimations in natural gas custody transfer through pipelines. It is also essential to have accurate pressure-volume-temperature (PVT) data for developing equations of state (EOS). A highly accurate, high pressure and temperature, compact single sinker magnetic suspension densimeter has been used for density measurements. First, the densimeter is calibrated against pure component densities for which very reliable data are available. After validating its performance, the densities of four light natural gas mixtures that do not contain components heavier than hexane and two heavy gas mixtures containing hexane and heavier components having fractions more than 0.2 mole percent were measured. The light mixtures were measured in the temperature range of 250 to 450 K and in the pressure range of 10 to 150 MPa (1450 to 21,750 psi); the heavy mixtures were measured in the range of 270 to 340 K and in the pressure range of 3 to 35 MPa (500 to 5,000 psi). Out of those, the data for only four light natural gas mixtures have been presented in the dissertation due to confidentiality agreements that are still in force. A force transmission error and uncertainty analysis was carried out. The total uncertainty was calculated to be 0.11%. Data calculated in this work is compared with the current industry standard EOS for natural gas systems (AGA8-DC92 EOS) and GERG EOS, which is the most recently developed EOS for natural gas systems. The data measured as a part of this research should be used as reference quality data, either to modify the parameters of AGA8-DC92 EOS and GERG EOS or to develop a more reliable equation of state with wider ranges of pressure and temperature.

Atilhan, Mert

2007-08-01T23:59:59.000Z

130

Automated Continuous Commissioning of Commercial Buildings  

E-Print Network (OSTI)

Conference on Building Commissioning. San Francisco, CA. 17.Commercial Buildings Commissioning, LBNL- 56637, Nov. 2004.Automated Continuous Commissioning Tool GUI Screenshots from

Bailey, Trevor

2013-01-01T23:59:59.000Z

131

Commissioning of the ATLAS pixel detector  

E-Print Network (OSTI)

Commissioning of the ATLAS pixel detector Tobias GollingUniversity of California. Commissioning of the ATLAS pixelof the past and future commissioning activities of the ATLAS

Golling, Tobias; ATLAS Collaboration

2009-01-01T23:59:59.000Z

132

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

133

Colorado Ground Water Commission | Open Energy Information  

Open Energy Info (EERE)

Water Commission Jump to: navigation, search Name Colorado Ground Water Commission Place Colorado Website http:water.state.co.usgroun References Colorado Ground Water Commission...

134

Compact Process Development at Babcock & Wilcox  

Science Conference Proceedings (OSTI)

Multiple process approaches have been used historically to manufacture cylindrical nuclear fuel compacts. Scale-up of fuel compacting was required for the Next Generation Nuclear Plant (NGNP) project to achieve an economically viable automated production process capable of providing a minimum of 10 compacts/minute with high production yields. In addition, the scale-up effort was required to achieve matrix density equivalent to baseline historical production processes, and allow compacting at fuel packing fractions up to 46% by volume. The scale-up approach of jet milling, fluid-bed overcoating, and hot-press compacting adopted in the U.S. Advanced Gas Reactor (AGR) Fuel Development Program involves significant paradigm shifts to capitalize on distinct advantages in simplicity, yield, and elimination of mixed waste. A series of compaction trials have been completed to optimize compaction conditions of time, temperature, and forming pressure using natural uranium oxycarbide (NUCO) fuel at packing fractions exceeding 46% by volume. Results from these trials are included. The scale-up effort is nearing completion with the process installed and operable using nuclear fuel materials. Final process testing is in progress to certify the process for manufacture of qualification test fuel compacts in 2012.

Eric Shaber; Jeffrey Phillips

2012-03-01T23:59:59.000Z

135

Commissioning Specifications | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Specifications Specifications Commissioning Specifications October 16, 2013 - 4:44pm Addthis Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and performance testing procedures are typically included in the specifications to let contractors know what standards are required during the various testing phases involved throughout the commissioning process. Since renewable energy technologies are changing and developing rapidly, it is critical to have the commissioning specifications developed by a well-informed resource with up-to-date renewable energy expertise. This resource must also have a thorough understanding of how renewable energy

136

State Oil and Gas Boards | Open Energy Information  

Open Energy Info (EERE)

Boards Boards Jump to: navigation, search State Oil and Gas Board and Commission sites are related to oil and gas production, well sites, and any other relevant data and information. The Interstate Oil and Gas Compact Commission is a multi-state government agency that promotes the quality of life for all Americans. This list is where information for OpenEI pages is held, and also, in most cases, where oil and gas data can be derived, open to the public. In many cases, EIA may hold the data related to Oil and Gas. Also, some datasets may only contain a state report pdf, in which case the data would need to be pulled out of the pdf and put into an excel or xml. Here are the states: State link Information Contact info Alabama Alabama Oil and Gas Board The State Oil and Gas Board of Alabama is a regulatory agency of the State of Alabama with the statutory charge of preventing waste and promoting the conservation of oil and gas while ensuring the protection of both the environment and the correlative rights of owners. The Board is granted broad authority in Alabama oil and gas conservation statutes to promulgate and enforce rules and regulations to ensure the conservation and proper development of Alabama's petroleum resources. 420 Hackberry Lane Tuscaloosa, AL 35401 205.349.2852

137

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Process Commissioning Process Commissioning Process October 7, 2013 - 9:19am Addthis The commissioning process for Federal facilities generally follows a four-step process. This process holds true across all forms of commissioning and for both new and existing buildings. Step 1: Planning The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step include: Optimizing building operations to reduce operating costs Addressing complaints from occupants regarding air quality or comforts Creating a model facility Improving facility operations and maintenance (O&M) and reducing emergency calls. When forming the commissioning team, considerations could include

138

Natural Gas Weekly Update  

Gasoline and Diesel Fuel Update (EIA)

Report," and the Historical Weekly Storage Estimates Database. Other Market Trends: FERC Investigates Natural Gas Wash-Trading: The Federal Energy Regulatory Commission (FERC)...

139

Gas  

Science Conference Proceedings (OSTI)

... Implements a gas based on the ideal gas law. It should be noted that this model of gases is niave (from many perspectives). ...

140

STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY EDMUND G, BROWN JR" Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

on the Project's S-100 General Electric Frame 7 Gas Turbine Generator (S-1 00 gas turbine). The modi from Stationary Gas Turbines. STAFF RECOMMENDATION Energy Commission staff reviewed the petition) combustor unit on the Project's S-100 General Electric Frame 7 Gas Turbine Generator (S-1 00 gas turbine

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Commissioning a materials research laboratory  

DOE Green Energy (OSTI)

This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

SAVAGE,GERALD A.

2000-03-28T23:59:59.000Z

142

ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

' ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum responds to your TWX certain information on the above subject. the documentation necessary to answer your available due to the records disposal vailing at the time of release or From records that are available and from disc&ions with most familiar with the transfer operations, &have the current radiological conditibn of transferred property is adequate under present standards. The following tabulations follow the format suggested in your TWX and are grouped to an operations or contract r+ponsibility. A,I Ex-AEC Storage Sites - I r:/ National Stockpile Site '(NSS) and OperatEonal

143

Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

144

Commissioning ATLAS Trigger  

E-Print Network (OSTI)

The ATLAS experiment at the Large Hadron Collider (LHC) will face the challenge of efficiently selecting interesting candidate events in $pp$ collisions at 14 TeV centre-of-mass energy, whilst rejecting the enormous number of background events. Therefore it is equipped with a three level trigger system. The first level is is hardware based and uses coarse granularity calorimeter information and fast readout muon chambers. The second and third level triggers, which are software based, will need to reduce the first level trigger output rate of ~ 75 kHz to ~ 200 Hz written out to mass storage. The progress in commissioning of this system will be reviewed in this paper.

Tomasz Bold; for Atlas Tdaq

2008-10-20T23:59:59.000Z

145

Biennial Assessment of the Fifth Power Plan Gas Turbine Power Plant Planning Assumptions  

E-Print Network (OSTI)

from Stationary Gas Turbines. STAFF RECOMMENDATION Energy Commission staff reviewed the petition regarding Nitrogen Oxides from Stationary Gas Turbines. STAFF RECOMMENDATION Energy Commission staff CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET SACRAMENTO. CA 95814-5512 STATE OF CALIFORNIA ENERGY

146

Midwest Nuclear Compact (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

The Midwest Nuclear Compact establishes a Midwest Nuclear Board to cooperatively evaluate and make recommendations regarding the development of nuclear technology, distribute information about...

147

PRELIMINARY Run Shutdown BL Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

148

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

Readiness Review Team (BCRRT) 1. Purpose The APS Beamline Commissioning Readiness Review Team (BCRRT) reports to and advises the AES Associate Division Director for Mechanical and...

149

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

AES AES CCSM & BCRRT Chair J. Vacca AES RSO-Health Physicist W. VanWingeren AES AES Commissioning Coordinator Floor Coordinator AES Beamline Operations Support Beamline Staff...

150

The 'Supply-of-Storage' for Natural Gas in California  

E-Print Network (OSTI)

the Hedging Effectiveness of Natural Gas Futures. EnergyCommission. (2002). Natural Gas Supply and Infrastructureand Price Dynamics in Natural Gas City Gate Markets.

Uria, Rocio; Williams, Jeffrey

2005-01-01T23:59:59.000Z

151

State Oil and Gas Board State Oil and Gas Board Address Place Zip Website  

Open Energy Info (EERE)

State Oil and Gas Board Address Place Zip Website State Oil and Gas Board Address Place Zip Website Alabama Oil and Gas Board Alabama Oil and Gas Board Hackberry Lane Tuscaloosa Alabama http www gsa state al us ogb ogb html Alaska Division of Oil and Gas Alaska Division of Oil and Gas W th Ave Suite Anchorage Alaska http dog dnr alaska gov Alaska Oil and Gas Conservation Commission Alaska Oil and Gas Conservation Commission W th Ave Ste Anchorage Alaska http doa alaska gov ogc Arizona Oil and Gas Commission Arizona Oil and Gas Commission W Congress Street Suite Tucson Arizona http www azogcc az gov Arkansas Oil and Gas Commission Arkansas Oil and Gas Commission Natural Resources Dr Ste Little Rock Arkansas http www aogc state ar us JDesignerPro JDPArkansas AR Welcome html California Division of Oil Gas and Geothermal Resources California

152

Compact fast analyzer of rotary cuvette type  

DOE Patents (OSTI)

A compact fast analyzer of the rotary cuvette type is provided for simultaneously determining concentrations in a multiplicity of discrete samples using either absorbance or fluorescence measurement techniques. A rigid, generally rectangular frame defines optical passageways for the absorbance and fluorescence measurement systems. The frame also serves as a mounting structure for various optical components as well as for the cuvette rotor mount and drive system. A single light source and photodetector are used in making both absorbance and fluorescence measurements. Rotor removal and insertion are facilitated by a swing-out drive motor and rotor mount. BACKGROUND OF THE INVENTION The invention relates generally to concentration measuring instruments and more specifically to a compact fast analyzer of the rotary cuvette type which is suitable for making either absorbance or fluorescence measurements. It was made in the course of, or under, a contract with the U.S. Atomic Energy Commission.

Thacker, Louis H. (Knoxville, TN)

1976-01-01T23:59:59.000Z

153

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

, such as wind, solar, biomass, landfill gas, digester gas, geothermal, or small hydroelectric resources

154

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

renewable energy resources, such as wind, solar, biomass, landfill gas, digester gas, geothermal, or small

155

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fifth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

156

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Sixth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

157

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011, OAS-M-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 OAS-M-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011" INTRODUCTION AND OBJECTIVE The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy responsible for regulating the Nation's oil pipeline, natural gas, hydroelectric and wholesale electric industries. The Commission relies on a wide range of information technology (IT) resources in achieving its mission of assisting consumers in

158

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

extracted from the raw gas at gas processing plants o Flaring of acid gas at sour (flaring) gas processing-pressure gathering systems. It is conducted to a gas battery, dehydrated and compressed to meet sales specifications

159

Natural Gas Procurement Plan Rules (Arkansas)  

Energy.gov (U.S. Department of Energy (DOE))

The Natural Gas Procurement Plan Rules are promulgated under the authority of the Arkansas Public Service Commission. These rules require that utilities develop and maintain a diversified gas...

160

DOE, States Seek Closer Collaboration on Oil and Gas Supply and Delivery,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, States Seek Closer Collaboration on Oil and Gas Supply and DOE, States Seek Closer Collaboration on Oil and Gas Supply and Delivery, Climate Change Mitigation DOE, States Seek Closer Collaboration on Oil and Gas Supply and Delivery, Climate Change Mitigation October 1, 2009 - 1:00pm Addthis Washington, DC - An agreement aimed at improving cooperation and collaboration in the areas of oil and natural gas supply, delivery, and climate change mitigation, has been signed by the U.S. Department of Energy (DOE) and the Interstate Oil and Gas Compact Commission (IOGCC). The Memorandum of Understanding (MOU) provides a framework for states and DOE to work more closely on "responsible domestic production of oil and natural gas; carbon capture, transport and geologic storage; and other topics of mutual interest." The document was signed by DOE's Assistant

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trunkline LNG Company, LLC Docket No. PF12-8-000 Trunkline LNG Export, LLC Trunkline Gas Company, LLC SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED LAKE CHARLES LIQUEFACTION PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 21, 2013) As previously noticed on September 14, 2012, and supplemented herein, the staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Lake Charles Liquefaction Project involving construction and operation of facilities by Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; and Trunkline Gas

162

Federal Energy Management Program: Commissioning Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Commissioning Process to someone by E-mail Share Federal Energy Management Program: Commissioning Process on Facebook Tweet about Federal Energy Management Program: Commissioning Process on Twitter Bookmark Federal Energy Management Program: Commissioning Process on Google Bookmark Federal Energy Management Program: Commissioning Process on Delicious Rank Federal Energy Management Program: Commissioning Process on Digg Find More places to share Federal Energy Management Program: Commissioning Process on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Types Process Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases

163

Dynamic compaction of tungsten carbide powder.  

Science Conference Proceedings (OSTI)

The shock compaction behavior of a tungsten carbide powder was investigated using a new experimental design for gas-gun experiments. This design allows the Hugoniot properties to be measured with reasonably good accuracy despite the inherent difficulties involved with distended powders. The experiments also provide the first reshock state for the compacted powder. Experiments were conducted at impact velocities of 245, 500, and 711 m/s. A steady shock wave was observed for some of the sample thicknesses, but the remainder were attenuated due to release from the back of the impactor or the edge of the sample. The shock velocity for the powder was found to be quite low, and the propagating shock waves were seen to be very dispersive. The Hugoniot density for the 711 m/s experiment was close to ambient crystal density for tungsten carbide, indicating nearly complete compaction. When compared with quasi-static compaction results for the same material, the dynamic compaction data is seen to be significantly stiffer for the regime over which they overlap. Based on these initial results, recommendations are made for improving the experimental technique and for future work to improve our understanding of powder compaction.

Gluth, Jeffrey Weston; Hall, Clint Allen; Vogler, Tracy John; Grady, Dennis Edward

2005-04-01T23:59:59.000Z

164

A Case Study of Retro-Commissioning using Building 90  

NLE Websites -- All DOE Office Websites (Extended Search)

A Case Study of Retro-Commissioning using Building 90 A Case Study of Retro-Commissioning using Building 90 Speaker(s): Liping Wang Date: June 16, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Philip Haves The performance of HVAC systems may fail to satisfy design expectations due to equipment degradations, incorrect control sequences or sensor failures. Retro-commissioning identifies and implements cost-effective operational and maintenance improvements in existing buildings to bring the buildings up to the design intents. In this study, Building 90 at LBNL is used as a case study to demonstrate the processes of retro-commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening process at the whole building level. The building benchmarking results indicated a large energy saving potential for gas

165

Embedded Commissioning for Building Design  

E-Print Network (OSTI)

Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning as a building delivery embedded process that persistently verifies and validates design intent throughout the building lifecycle process. In the building lifecycle approach, buildings are considered to have cradle-to-grave life spans. They are modeled through a variety of different developmental phases. In this research project, we intend to build the necessary theory and tools to support the embedded commissioning process as a co-function of building lifecycle.

Akin, O.; Turkaslan-Bulbul, M. T.; Gursel, I.; Garrett, J. H.; Akinci, B.; Wang, H.

2004-01-01T23:59:59.000Z

166

BSA 07-22: Compact Room-Temperature Radiation Detector for Oil ...  

BSA 07-22: Compact Room-Temperature Radiation Detector for Oil & Gas Exploration. BNL Reference Number: BSA 07-22. Patent Status: U.S. Patent ...

167

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

on eligibility of hydroelectric and fuel cell facilities, respectively). The Energy Commission recognizesCalifornia Energy Commission STAFF REPORT RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Draft Staff Guidebook Fourth Edition AUGUST 2010 CEC3002010007SD #12;CALIFORNIA ENERGY COMMISSION Kate Zocchetti

168

Compact baby Skyrmions  

Science Conference Proceedings (OSTI)

For the baby Skyrme model with a specific potential, compacton solutions, i.e., configurations with a compact support and parabolic approach to the vacuum, are derived. Specifically, in the nontopological sector, we find spinning Q-balls and Q-shells, as well as peakons. Moreover, we obtain compact baby skyrmions with nontrivial topological charge. All these solutions may form stable multisoliton configurations provided they are sufficiently separated.

Adam, C. [Departamento de Fisica de Particulas, Universidad de Santiago and Instituto Galego de Fisica de Altas Enerxias (IGFAE), E-15782 Santiago de Compostela (Spain); Klimas, P. [Instituto de Fisica de Sao Carlos, Universidade de Sao Carlos, Caixa Postal 369, CEP 13560-970, Sao Carlos-SP (Brazil); Sanchez-Guillen, J. [Departamento de Fisica de Particulas, Universidad de Santiago and Instituto Galego de Fisica de Altas Enerxias (IGFAE), E-15782 Santiago de Compostela (Spain); Wereszczynski, A. [Institute of Physics, Jagiellonian University, Reymonta 4, Krakow (Poland)

2009-11-15T23:59:59.000Z

169

Compaction Scale Up and Optimization of Cylindrical Fuel Compacts for the Next Generation Nuclear Plant  

Science Conference Proceedings (OSTI)

Multiple process approaches have been used historically to manufacture cylindrical nuclear fuel compacts. Scale-up of fuel compacting was required for the Next Generation Nuclear Plant (NGNP) project to achieve an economically viable automated production process capable of providing a minimum of 10 compacts/minute with high production yields. In addition, the scale-up effort was required to achieve matrix density equivalent to baseline historical production processes, and allow compacting at fuel packing fractions up to 46% by volume. The scale-up approach of jet milling, fluid-bed overcoating, and hot-press compacting adopted in the U.S. Advanced Gas Reactor (AGR) Fuel Development Program involves significant paradigm shifts to capitalize on distinct advantages in simplicity, yield, and elimination of mixed waste. A series of designed experiments have been completed to optimize compaction conditions of time, temperature, and forming pressure using natural uranium oxycarbide (NUCO) fuel. Results from these experiments are included. The scale-up effort is nearing completion with the process installed and operational using nuclear fuel materials. The process is being certified for manufacture of qualification test fuel compacts for the AGR-5/6/7 experiment at the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL).

Jeffrey J. Einerson; Jeffrey A. Phillips; Eric L. Shaber; Scott E. Niedzialek; W. Clay Richardson; Scott G. Nagley

2012-10-01T23:59:59.000Z

170

u. S. Atomic Energy Commission  

Office of Legacy Management (LM)

October 31, 1949 Manager of Operations u. S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J....

171

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

: Solazyme, Incorporated, "Development of Pilot Production Plants for Soladiesel RD Utilizing) Renewable Diesel Solazyme, Inc. In Progress Non-Attainment (All) Source: Energy Commission staff analysis as a high percentage of sensitive populations. #12;2 Project Name Solazyme, Incorporated

172

Rivanna River Basin Commission (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

173

TATE OF CALIFORNI NERGY COMMISSION  

E-Print Network (OSTI)

and Wildlife), Blaine Parker (Columbia River Inter-Tribal Fish Commission) and Brad James (Washington and on sturgeon passage at Columbia River hydroelectric dams. The presentation will review progress

174

Commissioning of the HELIOS spectrometer.  

Science Conference Proceedings (OSTI)

This paper describes the implementation and commissioning of a device based on a new concept for measurements of nuclear reactions in inverse kinematics. The HELIcal Orbit Spectrometer, HELIOS, was commissioned at Argonne National Laboratory by studying the {sup 28}Si(d,p){sup 29}Si reaction in inverse kinematics. This experiment served as a proof of principle for this previously untested concept, and was used to verify the response and performance characteristics of HELIOS.

Lighthall, J. C.; Back, B. B.; Baker, S. I.; Freeman, S. J.; Lee, H. Y.; Kay, B. P.; Marley, S. T.; Rehm, K. E.; Rohrer, J. E.; Schiffer, J. P.; Shetty, D. V.; Vann, A. W.; Winkelbauer, J. R.; Wuosmaa, A. H.; Physics; Western Michigan Univ.; Univ. of Manchester

2010-01-01T23:59:59.000Z

175

Wisconsin SRF Electron Gun Commissioning  

SciTech Connect

The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

Bisognano, Joseph J. [University of Wisconsin-Madison; Bissen, M. [University of Wisconsin-Madison; Bosch, R. [University of Wisconsin-Madison; Efremov, M. [University of Wisconsin-Madison; Eisert, D. [University of Wisconsin-Madison; Fisher, M. [University of Wisconsin-Madison; Green, M. [University of Wisconsin-Madison; Jacobs, K. [University of Wisconsin-Madison; Keil, R. [University of Wisconsin-Madison; Kleman, K. [University of Wisconsin-Madison; Rogers, G. [University of Wisconsin-Madison; Severson, M. [University of Wisconsin-Madison; Yavuz, D. D. [University of Wisconsin-Madison; Legg, Robert A. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curtis [JLAB; Plawski, Tomasz [JLAB; Powers, Thomas J. [JLAB

2013-12-01T23:59:59.000Z

176

Commissioning: A Highly Cost-Effective Building Energy Management Strategy  

E-Print Network (OSTI)

Commissioning: A Highly Cost-Effective Building Energypractice of building commissioning is a particularly potentefficiency. Although commissioning has earned increased

Mills, Evan

2012-01-01T23:59:59.000Z

177

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002, IG-0569 THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002,...

178

Types of Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Types of Commissioning Types of Commissioning Types of Commissioning October 7, 2013 - 9:17am Addthis Several commissioning types exist to address the specific needs of equipment and systems across both new and existing buildings. The following commissioning types provide a good overview. New Building Commissioning New building commissioning happens during the design and construction of new facilities. The process ensures that systems and equipment in new buildings operate properly. This is done through design reviews, functional testing, system documentation, and operator training. Federal agencies should consider new building commissioning when building new facilities or undergoing major facility renovations. The process is best implemented through all phases of construction.

179

Potential Benefits of Commissioning California Homes  

NLE Websites -- All DOE Office Websites (Extended Search)

Potential Benefits of Commissioning California Homes Title Potential Benefits of Commissioning California Homes Publication Type Report LBNL Report Number LBNL-48258 Year of...

180

Federal Energy Management Program: Types of Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

of Commissioning to someone by E-mail Share Federal Energy Management Program: Types of Commissioning on Facebook Tweet about Federal Energy Management Program: Types of...

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Residential Commissioning: A Review of Related Literature  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commissioning: A Review of Related Literature Title Residential Commissioning: A Review of Related Literature Publication Type Report LBNL Report Number LBNL-44535 Year...

182

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and...

183

Summary report: Low-level radioactive waste management activities in the states and compacts, Volume 5, Number 1  

Science Conference Proceedings (OSTI)

Information is given on the ten compacts and their host state, describing the governing body, member states, date established, current waste management, and siting, licensing, and projected date of a disposal facility. Reports are also given on the eight states that remain unaffiliated with a compact commission.

Norris, C. [ed.

1997-01-01T23:59:59.000Z

184

Summary report: Low-level radioactive waste management activities in the states and compacts, Volume 5, Number 2  

Science Conference Proceedings (OSTI)

Information is given on the ten compacts and their host state, describing the governing body, member states, date established, current waste management, and siting, licensing, and projected date of a disposal facility. Reports are also given on the eight states that remain unaffiliated with a compact commission.

Norris, C. [ed.

1997-07-01T23:59:59.000Z

185

CALIFORNIA ENERGY COMMISSION Advisory Committee Members for the  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION Advisory Committee Members for the Alternative and Renewable Fuel ­ California Air Resources Board Tim Carmichael ­ California Natural Gas Vehicle Coalition Will Coleman Association Joe Gershen ­ California Biodiesel Alliance (courtesy of Crimson Renewable Energy) Bonnie Holmes

186

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA  

E-Print Network (OSTI)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking, 2011) SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E), SAN DIEGO GAS & ELECTRIC COMPANY (U 902-M PROGRAM INVESTMENT CHARGE PROGRAM KRIS G. VYAS Attorney for SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut

187

Compactly supported cohomology of buildings  

E-Print Network (OSTI)

We compute the compactly supported cohomology of the standard realization of any locally finite building.

Davis, Michael; Januszkiewicz, Tadeusz; Meier, John; Okun, Boris

2008-01-01T23:59:59.000Z

188

AGENCY: Federal Energy Regulatory Commission. ACTION: Final Rule.  

E-Print Network (OSTI)

SUMMARY: The Federal Energy Regulatory Commission (Commission) is amending its regulations in accordance with section 311(d) of the Energy Policy Act of 2005 (EPAct 2005) to establish mandatory procedures requiring prospective applicants to begin the Commissions pre-filing review process at least six months prior to filing an application for authorization to site and construct a liquefied natural gas (LNG) terminal. Section 311(d) of EPAct 2005, enacted on August 8, 2005, directs the Commission to promulgate such regulations within 60 days after enactment of EPAct 2005. The regulations mandatory procedures are designed to encourage applicants for LNG terminal siting and construction authority to cooperate with state and local officials, as required by EPAct 2005. The regulations also make the pre-filing process mandatory for prospective applicants for authority to construct related jurisdictional pipeline and other natural gas facilities, as defined in the regulations. The regulations also require a prospective applicant to comply with the pre-filing procedures prior to filing an application to make modifications to an existing or authorized LNG terminalDocket No. RM05-31-000-- 2--if such modifications involve significant state and local safety considerations that have

Richard Hoffmann; John Leiss; Whit Holden

2005-01-01T23:59:59.000Z

189

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

gas storage in stabilizing California's natural gas market. · Assess residential customer behavior and costeffectiveness of storage facilities. · Develop guidelines to mitigate geohazards for natural gas pipelines research that evaluates the potential role of natural gas storage in stabilizing California's natural gas

190

Federal Energy Regulation Commission Issues Smart Grid ...  

Science Conference Proceedings (OSTI)

Federal Energy Regulation Commission Issues Smart Grid Policy Statement. For Immediate Release: July 17, 2009. ...

2012-06-04T23:59:59.000Z

191

Commissioning Building Systems for Improved Energy ...  

Science Conference Proceedings (OSTI)

Commissioning Building Systems for Improved Energy Performance Project. Summary: NIST will advance commercial building ...

2012-12-17T23:59:59.000Z

192

About the EIA Oil and Gas Field Code Master List  

U.S. Energy Information Administration (EIA)

Colorado Colorado Department of Natural Resources, Oil and Gas Conservation Commission Florida Florida Geology Survey, Department of Environmental ...

193

What's Up with the California Commissioning Collaborative?  

NLE Websites -- All DOE Office Websites (Extended Search)

What's Up with the California Commissioning Collaborative? What's Up with the California Commissioning Collaborative? Speaker(s): Kristin Heinemeier Date: July 8, 2005 - 12:00pm Location: Bldg. 90 The California Commissioning Collaborative's objectives are: --to improve building performance by developing and promoting viable building commissioning practices in California; --to facilitate the development of cost effective programs, tools, techniques and service delivery infrastructure to enable the implementation of building commissioning processes; --to educate and inform concerning building commissioning processes; and --to identify opportunities, establish priorities and promote solutions relating to building commissioning processes in California. Find out about who the CCC is, and their latest activities,

194

European Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Name European Commission Place Brussels, Belgium Website http://ec.europa.eu/index_en.h Coordinates 50.8503396°, 4.3517103° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8503396,"lon":4.3517103,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

195

Using Simulation Models for Building Commissioning  

E-Print Network (OSTI)

The International Energy Agency ECBCS Annex 40 Commissioning of Buildings and HVAC Systems for Improved Energy Performance task investigating Use of Whole Building Simulation in Commissioning has identified the following applications of whole simulation in the commissioning process: 1) during the design process; 2) in post-construction commissioning of new buildings; 3) design simulation for ongoing commissioning; 4) calibrated simulation for retro commissioning; 5) calibrated simulation for on-going commissioning; and 6) simulation to evaluate new control code. These applications are discussed and examples of each of these applications are provided. The only one of these which has been applied in routine commissioning projects is the use of calibrated simulation for retro commissioning. The other examples have been applied in a research setting, and costs must be lowered for routine application, but there appears to be potential for significant application of simulation in the commissioning process.

Claridge, D. E.

2004-01-01T23:59:59.000Z

196

Commissioning of the ATLAS Experiment  

E-Print Network (OSTI)

The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The sub-detector integration in recent milestone weeks is described. Cosmic commissioning in milestone week M6 included simultaneous data-taking and combined track analysis of the muon detector and inner detector, as well as combined analysis of muon detector and muon trigger. The calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The high-level-trigger infrastructure is being installed and algorithms tested in technical runs.

Juergen Thomas; for the ATLAS Collaboration at CERN

2008-08-07T23:59:59.000Z

197

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

198

TATE OF CALIFORNI NERGY COMMISSION  

E-Print Network (OSTI)

Gray Davis, Governor DECEMBER 2000 P700-00-018 ENERGY FACILITY LICENSING PROCESS Natural Gas Supply NATURAL GAS SUPPLY INFORMATION Introduction This paper was prepared in response to AB 970 in an effort power plant. Natural Gas Supply Background Traditional natural gas supply sources for California include

199

California Energy Commission Apply Today!  

E-Print Network (OSTI)

photovoltaic project in the future. Peak Demand Savings: 95 kW Energy Savings: 1,510,849 kWh Annual Energy CostCalifornia Energy Commission Apply Today! "The College implemented all of the recommended projects Programs Office (916) 654-4147 pubprog@energy.state.ca.us "CEC financing allowed us to install many

200

California Energy Commission STAFF DRAFT  

E-Print Network (OSTI)

efficiency small engined cars, hybrid cars, biofuels and a significant switch to public transport. Tough) and to diesel and biofuels for cars. It is the aim of the European Commission that the EU ETS scheme under stable market conditions. Current volatility in wholesale electricity markets works against

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Blackbody radiation with compact and non-compact extra dimensions  

E-Print Network (OSTI)

The problem of blackbody radiation in flat space with non-compact extra dimensions was analysed recently. In the present article we reanalyse this problem with compact (and non-compact) extra dimensions in flat space to observe the consequences of this approach upon Wien's displacement and Stefan-Boltzmann law.

Ramaton Ramos; Henrique Boschi-Filho

2009-10-08T23:59:59.000Z

202

Progress in Compact Toroid Experiments  

SciTech Connect

The term "compact toroids" as used here means spherical tokamaks, spheromaks, and field reversed configurations, but not reversed field pinches. There are about 17 compact toroid experiments under construction or operating, with approximate parameters listed in Table 1.

Dolan, Thomas James

2002-09-01T23:59:59.000Z

203

Competition in a Network of Markets: The Natural Gas Industry  

E-Print Network (OSTI)

Regulatory Commission (FERC). Under the NGA, pipelines wereby for gas users, the FERC authorized transportation ofcustomer-owned gas. The FERC approved transportation

Walls, W. David

1992-01-01T23:59:59.000Z

204

Bringing Better Planning and Energy Efficiency to Gas Utilities  

NLE Websites -- All DOE Office Websites (Extended Search)

being accelerated by recent policy changes at the Federal Energy Regulatory Commission. FERC Order 636 requires gas utilities to become active managers of their gas portfolios....

205

Minimum Gas Service Standards (Ohio)  

Energy.gov (U.S. Department of Energy (DOE))

Natural gas companies in Ohio are required to follow the Minimum Gas Service Standards, which are set and enforced by the Public Utilities Commission of Ohio. These rules are found in chapter 4901...

206

Microsoft Windows Embedded Compact Cryptographic ...  

Science Conference Proceedings (OSTI)

Page 1. Microsoft Windows Cryptographic Primitives Library (bcrypt.dll) Security Policy Document ... Microsoft Windows Embedded Compact ...

2013-08-07T23:59:59.000Z

207

INTERNATIONAL COMMISSION ON LARGE DAMS  

E-Print Network (OSTI)

earthquake. The dam was designed as a concrete gravity dam constructed using roller-compacted concrete (RCC a week. The Olivenhain Dam is the first RCC gravity dam permitted by the state of California and), is the tallest RCC dam in the North America. The Olivenhain Dam has the typical geometry for concrete gravity

Bowles, David S.

208

The California Energy Commission's geothermal activities  

SciTech Connect

Thank you for the invitation to participate in this distinguished gathering. I would like to briefly relate the interests of the California Energy Commission in geothermal energy. Geothermal energy is a basic component of many of our primary activities, and is expressly cited in our statutory authority, the Warren-Alquist Act (1974). Our mandates affect the geothermal industry both directly and indirectly. The Commission is responsible for 5-, 12-, and 20-year forecasts of California electricity supply and demand. These forecasts are reported in our biennial Electricity Report. These forecasts are used in various official regulatory proceedings. The primary use is in the Commission's power plant siting authority. The forecasts establish the base used to determine the need for new capacity and energy in the current planning period. The forecasts are also used in other Commission activities as well as in proceedings at the Public Utilities Commission. The 1990 Electricity Report represents a dramatic change in the way this agency balances the relative importance of price competition, environmental quality, demand management as a system resource, and the implications of continued reliance on natural gas. Generally, the Commission is grappling with the elusive and complex problems of quantifying the appropriate value to assign to external (i. e., non-market) environmental attributes of competing technologies. While we have not decisively established such values, we do believe that they do exist and that we are moving in the right direction. The adopted policies have positive long term implications for geothermal and the other renewable technologies. The Commission has been in existence since 1975 and during that time has seen the development of geothermal energy in several areas of the state. As a regulatory agency, we have authority over the construction of thermal electric plants over 50 megawatts (MW). To date the Commission has certified the construction of more than 1200 MW in the Geysers. This area is now experiencing a dramatic loss in productivity. The Commission is engaged in a cooperative effort with the parties operating in the Geysers to address the problem of resource productivity. We held a hearing to examine the causes of the decline of the geothermal steam resources and its affect on electric energy supply. An outcome of the hearing was the establishment of a Technical Advisory Committee with the responsibility of providing the Commission projections of capacity and energy under the current rates of steam decline. The Committee was also charged with examining options on efficient resource management, including research and development, testing, and analyses regarding reservoir and power plant operations.

Crowley, Barbara

1991-01-01T23:59:59.000Z

209

Intrastate Natural Gas Companies  

E-Print Network (OSTI)

SUMMARY: In this Final Rule, the Commission eliminates the semi-annual storage reporting requirements for Interstate and Intrastate Natural Gas Companies. The Commission finds that these particular reporting requirements are largely duplicative with other reporting requirements. EFFECTIVE DATE: This rule will become effective [insert date 60 days from publication in Federal Register].

unknown authors

2012-01-01T23:59:59.000Z

210

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMISSION COMMISSION ) In the Matter of ) July 19,2010 1 U.S. DEPARTMENT OF ENERGY 1 Docket No. 63-001-HLW 1 (High Level Waste Repository 1 Construction Authorization Application) ) ) U.S. DEPARTMENT OF ENERGY'S REPLY BRIEF IN SUPPORT OF REVIEW AND REVERSAL OF THE BOARD'S RULING ON THE MOTION TO WITHDRAW Scott Blake Harris Donald P. Irwin Sean A. Lev Michael R. Shebelskie James Bennett McRae HUNTON & WILLIAMS LLP U.S. DEPARTMENT OF ENERGY Riverfront Plaza, East Tower Office of General Counsel 95 1 East Byrd Street Department of Energy Richmond, Virginia 232 19-4074 1000 Independence Avenue, S. W. Washington, D.C. 20585 Counsel for the U.S. Department of Energy Table of Contents Page . . ........................................................................................................................ Table of Authorities

211

Best Practices in Existing Building Commissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 20-21, 2010 OCTOBER 20-21, 2010 RAPID CITY, SD Best Practices in Existing Building Commissioning Carl E. Lundstrom, P. E., CCP Federal Solutions Manager E M C Engineers, Inc. - Subsidiary of Eaton Corporation * The Purpose & Benefits of Existing Building Commissioning (EBCx) * The Building Commissioning Association (BCA) & "Best Practices" * Contracting & Hiring Qualified Providers * Typical Measures & Ideal Facilities * Success Factors Presentation Agenda What is The Building Commissioning Association? Integrity Leadership Quality Expertise  International non-profit organization (founded in 1998)  Recognized commissioning authority and resource  Commissioning providers, building owners, energy companies, facility managers, architects, engineers, and contractors

212

Electronic Compact Fluorescent Lamps  

Science Conference Proceedings (OSTI)

This EPRI Technical Update addresses the fastest growing energy efficient light source the electronic compact fluorescent lamp (CFL). Business and technical market factors (Chapter 2) explain the past and future growth of the CFL market while emphasizing future technical improvements along with discussion of the importance of utility involvement in helping their customers make the switch from incandescent lamps to CFLs. The basic CFL technology is covered in Chapter 3 including test results for selected ...

2007-12-18T23:59:59.000Z

213

Compact power reactor  

DOE Patents (OSTI)

There is disclosed a small compact nuclear reactor operating in the epithermal neutron energy range for supplying power at remote locations, as for a satellite. The core contains fuel moderator elements of Zr hydride with 7 w/o of 93% enriched uranium alloy. The core has a radial beryllium reflector and is cooled by liquid metal coolant such as NaK. The reactor is controlled and shut down by moving portions of the reflector.

Wetch, Joseph R. (Woodland Hills, CA); Dieckamp, Herman M. (Canoga Park, CA); Wilson, Lewis A. (Canoga Park, CA)

1978-01-01T23:59:59.000Z

214

Compact superradiant Cerenkov source  

Science Conference Proceedings (OSTI)

An economical, coherent, and widely tunable source does not exist spanning the far-infrared electromagnetic spectral range of 50-1000 {mu}m in wavelength. The Cerenkov free-electron laser (CFEL) is a promising candidate. This report describes an experimental investigation of a compact CFEL driven by a high-quality low-energy electron beam. Cerenkov emission and strong gain but remarkably low output coupling were observed.

Owens, I.J.; Brownell, J.H. [Department of Physics and Astronomy, Dartmouth College, Hanover, New Hampshire 03755-3528 (United States)

2005-05-15T23:59:59.000Z

215

Compact Fluorescent Lamps  

Science Conference Proceedings (OSTI)

Electric lighting constitutes approximately 21-23 % of the electric grid load in the United States. The higher energy and maintenance costs of incandescent lamps, combined with the favorable economics of high-efficiency compact fluorescent lamps (CFLs), are making CFLs the increasingly popular choice for both residential and commercial lighting. Utility incentive and rebate programs to stimulate CFL use and the beginnings of a ban on incandescent lamps are enhancing CFL penetration levels in these enviro...

2009-12-17T23:59:59.000Z

216

Summary report. Low-level radioactive waste management activities in the states and compacts. Volume 4, No. 2  

Science Conference Proceedings (OSTI)

`Low-Level Radioactive Waste Management Activities in the States and Compacts` is a supplement to `LLW Notes` and is distributed periodically by Afton Associates, Inc. to state, compact and federal officials that receive `LLW Notes`. The Low-Level Radioactive Waste Forum (LLW Forum) is an association of state and compact representatives, appointed by governors and compact commissions, established to facilitate state and compact implementation of the Low- Level Radioactive Waste Policy Act of 1980 and the Low-Level Radioactive Waste Policy Amendments Act of 1985 and to promote the objectives of low-level radioactive waste regional compacts. The LLW Forum provides an opportunity for state and compact officials to share information with one another and to exchange views with officials of federal agencies and other interested parties.

NONE

1996-08-01T23:59:59.000Z

217

Summary report, low-level radioactive waste management activities in the states and compacts. Vol. 4. No. 1  

Science Conference Proceedings (OSTI)

`Low-Level Radioactive Waste Management Activities in the States and Compacts` is a supplement to `LLW Notes` and is distributed periodically by Afton Associates, Inc. to state, compact and federal officials that receive `LLW Notes`. The Low-Level Radioactive Waste Forum (LLW Forum) is an association of state and compact representatives, appointed by governors and compact commissions, established to facilitate state and compact implementation of the Low- Level Radioactive Waste Policy Act of 1980 and the Low-Level Radioactive Waste Policy Amendments Act of 1985 and to promote the objectives of low-level radioactive waste regional compacts. The LLW Forum provides an opportunity for state and compact officials to share information with one another and to exchange views with officials of federal agencies and other interested parties.

NONE

1996-01-01T23:59:59.000Z

218

COMMISSION  

E-Print Network (OSTI)

amended), the National Science Foundation announces the following meeting: Name: Advisory Committee for Polar Programs (1130). Date/Time: May 29, 2008, 8 a.m. to 5 p.m.

Committee Act (pub L

2008-01-01T23:59:59.000Z

219

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. Attention: Mr. Eber R. Price Gentlemen: This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May Z-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. SW-154 and S.Iw-329. Reblying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples "ere observed. A. Incidents Involving Thorium Six incidents have bee" noted involving thorium, natural isotopic ClSS=y. The counts of the air samples in these six samples are as follows: Microcuries per ml of Air

220

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. .I,.----- Attention: Mr. Eber R. Price Gentlemen: ' B?&-# This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May 2-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. S&l-154 and SNM-329. Replying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples were observed. A. I&dents Involving Thorium Six incidents have been noted involving thorium, natural isotopic CLSS5.Y. follows: The counts of the air samples in these six samples are as

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

United States Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsýýpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

222

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

Natural Gas Vehicle Fuel ­ Oroville, California · Pixley Biogas ­ Pixley, California · High Mountain Fuels

223

Commissioning the CDF offline software  

SciTech Connect

CDF II is one of the two large collider experiments at Fermilab's Tevatron. Over the past two years we have commissioned the offline computing system. A task that has involved bringing up hundreds of computers and millions of lines of C++ software. This paper reports on this experience, concentrating on the software aspects of the project. We will highlight some of the successes as well as describe some of the work still to do.

Elizabeth Sexton-Kennedy and Pasha Murat

2004-03-17T23:59:59.000Z

224

On Line Beamline Commissioning Activity Approval Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Activity Approval Form Commissioning Activity Approval Form This form is to be filled by the Commissioning Activity Team Leader. No beamline commissioning activities will be allowed to run without a properly completed, approved, and posting of this commissioning approval form. You will be notified by e-mail upon approval. Sector Beamline Expected Start Date Expected Duration 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 BM ID ( Give a Unit) Activity Description( Give only a brief description) Commissioning Team Members First and Last Name Affiliation Phone Number 1. 2. 3. 4. 5. 6. Special Safety Concerns Commissioning Activity Team Leader Name E-Mail Address Submit Commissioning Activity Approval Form Clear all Fields and start All over again!!!

225

TB-14 Section 8 - Beamline Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

8. Beamline Commissioning (Rev. July 21, 1998) A beamline commissioning process has been instituted to ensure that all systems are in place so that a beamline can perform in a safe...

226

Flathead Basin Commission Act of 1983 (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

227

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

proposals for liquefied natural gas (LNG) facilities in the state to supplement supplies through imported natural gas from other countries. In the ensuing years, the majority of LNG proposals were abandoned natural gas (LNG) to complement domestic supplies. At one point, there were up to four proposals to build

228

Design and Commissioning of a Laboratory Scale ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Electrometallurgy 2012. Presentation Title, Design and Commissioning of a...

229

Commissioning of Emirates Aluminium Smelter Potlines  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Aluminum Reduction Technology. Presentation Title, Commissioning of...

230

IOGCC/DOE oil and gas environmental workshop  

SciTech Connect

The Interstate Oil and Gas Compact Commission (IOGCC) in cooperation with US Department of Energy (DOE) has developed a workshop format to allow state regulatory officials and industry representatives the opportunity to participate in frank and open discussions on issues of environmental regulatory compliance. The purpose in providing this forum is to assist both groups in identifying the key barriers to the economic recoverability of domestic oil and gas resources while adequately protecting human health and the environment. The following topics were discussed, groundwater protection; temporarily abandoned and idle wells; effluent discharges; storm water runoff; monitoring and compliance; wetlands; naturally occurring radioactive materials; RCRA reauthorization and oil pollution prevention regulation. At the conclusion, all of the participants were asked to complete a questionnaire which critiqued the day activities. A discussion of each of the issues is made a part of this report as is a summary of the critique questionnaire which were received.

Not Available

1991-05-16T23:59:59.000Z

231

Corporation Commission Hydraulic FracturingHydraulic Fracturing  

E-Print Network (OSTI)

Corporation Commission Hydraulic FracturingHydraulic Fracturing Joint Committee on Energy Commission What is Hydraulic Fracturing d H D It W k?and How Does It Work? · Stimulates a well to increase by Stanolind Oil Company. 2 #12;Kansas Corporation Commission Are Hydraulic Fracture Jobs Performed in Kansas

Peterson, Blake R.

232

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE  

E-Print Network (OSTI)

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE Contact: Linda White California Postsecondary Education Commission 1303 J Street, Suite 500 Sacramento, California 95814-2938 (916) 322-7984 lwhite@cpec.ca.gov Commission Awards $1,889,657 Grant to California State University Fullerton to Improve

de Lijser, Peter

233

HYTEST Phase I Facility Commissioning and Modeling  

DOE Green Energy (OSTI)

The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

2009-09-01T23:59:59.000Z

234

Texas Commission on Environmental Quality | Open Energy Information  

Open Energy Info (EERE)

Texas Commission on Environmental Quality Jump to: navigation, search Logo: Texas Commission on Environmental Quality Name Texas Commission on Environmental Quality Address 12100...

235

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

Conference on Building Commissioning: April 19-21, 2006Auto-DR Strategies and Commissioning One common questionConference on Building Commissioning: April 19-21, 2006

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

236

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

Conference on Building Commissioning. May 2002. Motegi,et al: Results and Commissioning Issues from an AutomatedConference on Building Commissioning: May 1e-20, 2004

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

237

Commissioning of the superconducting ECR ion source VENUS  

E-Print Network (OSTI)

COMMISSIONING OF THE SUPERCONDUCTING ECR ION SOURCE VENUS *paper describes the ongoing commissioning. Initial resultscoils [2]. During commissioning of the superconducting

Leitner, Daniela; Abbott, Steve R.; Dwinell, Roger D.; Leitner, Matthaeus; Taylor, Clyde; Lyneis, Claude M.

2003-01-01T23:59:59.000Z

238

PP-54 Ontario Hydro Electric Power Commission | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct,...

239

Compact gate valve  

DOE Patents (OSTI)

This invention relates to a double-disc gate valve which is compact, comparatively simple to construct, and capable of maintaining high closing pressures on the valve discs with low frictional forces. The valve casing includes axially aligned ports. Mounted in the casing is a sealed chamber which is pivotable transversely of the axis of the ports. The chamber contains the levers for moving the valve discs axially, and an actuator for the levers. When an external drive means pivots the chamber to a position where the discs are between the ports and axially aligned therewith, the actuator for the levers is energized to move the discs into sealing engagement with the ports.

Bobo, Gerald E. (Knoxville, TN)

1977-01-01T23:59:59.000Z

240

Compact laser amplifier system  

DOE Patents (OSTI)

A compact laser amplifier system is described in which a plurality of face-pumped annular disks, aligned along a common axis, independently radially amplify a stimulating light pulse. Partially reflective or lasing means, coaxially positioned at the center of each annualar disk, radially deflects a stimulating light directed down the common axis uniformly into each disk for amplification, such that the light is amplified by the disks in a parallel manner. Circumferential reflecting means coaxially disposed around each disk directs amplified light emission, either toward a common point or in a common direction. (Official Gazette)

Carr, R.B.

1974-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Prepared for the European Commission Directorate General for Energy  

E-Print Network (OSTI)

This final report presents the results of the analyses at relevant trends and features in the EU gas market enabling or limiting more competition. The study focuses in particular on the possible impacts of the implementation of the EU Gas Directive and subsequently of the expected effects of increasing competition and further integration of gas markets in Europe. The study is conducted in the framework of the Shared Analysis project entitled Economic Foundations for Energy Policy, coordinated by FhG-ISI and prepared for the European Commission Directorate General for Energy. The report contains an analysis of the recent changes in the structure of gas demand and the supply and its consequences for enhancement of competition in the EU gas market. It discusses the role of growing gas demand, changing structure of the supply industry and access to the network. Next, the implementation EU Gas Directive is discussed. In order to deal with the uncertainty in the results of the implementation process, two extreme institutional scenarios for future development of the liberalisation process in the EU gas markets are formulated. Finally the consequences of these two gas market liberalisation scenarios are analysed. Note that part of the conclusions of the expected effects of the Directive, i.e. the expected changes in gas prices

F. Van Oostvoorn; M. G. Boots Abstract

1999-01-01T23:59:59.000Z

242

Beyond Commissioning: The Role of Automation  

Science Conference Proceedings (OSTI)

This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2005-02-01T23:59:59.000Z

243

Stirling Air Conditioner for Compact Cooling  

Science Conference Proceedings (OSTI)

BEETIT Project: Infinia is developing a compact air conditioner that uses an unconventional high efficient Stirling cycle system (vs. conventional vapor compression systems) to produce cool air that is energy efficient and does not rely on polluting refrigerants. The Stirling cycle system is a type of air conditioning system that uses a motor with a piston to remove heat to the outside atmosphere using a gas refrigerant. To date, Stirling systems have been expensive and have not had the right kind of heat exchanger to help cool air efficiently. Infinia is using chip cooling technology from the computer industry to make improvements to the heat exchanger and improve system performance. Infinias air conditioner uses helium gas as refrigerant, an environmentally benign gas that does not react with other chemicals and does not burn. Infinias improvements to the Stirling cycle system will enable the cost-effective mass production of high-efficiency air conditioners that use no polluting refrigerants.

None

2010-09-01T23:59:59.000Z

244

Regulatory Commission (Commission) directs the North American Electric Reliability  

E-Print Network (OSTI)

submit to the Commission for approval proposed Reliability Standards that address the impact of geomagnetic disturbances (GMD) on the reliable operation of the Bulk-Power System. The Commission directs NERC to implement the directive in two stages. In the first stage, NERC must submit, within six months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to develop and implement operational procedures to mitigate the effects of GMDs consistent with the reliable operation of the Bulk-Power System. In the second stage, NERC must submit, within 18 months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to conduct initial and on-going assessments of the potential impact of benchmark GMDDocket No. RM12-22-000- 2-events on Bulk-Power System equipment and the Bulk-Power System as a whole. The Second Stage GMD Reliability Standards must identify benchmark GMD events that specify what severity GMD events a responsible entity must assess for potential impacts on the Bulk-Power System. If the assessments identify potential impacts from benchmark GMD events, the Reliability Standards should require owners and operators

Cfr Part

2013-01-01T23:59:59.000Z

245

Valve for gas centrifuges  

DOE Patents (OSTI)

The invention is pneumatically operated valve assembly for simulatenously (1) closing gas-transfer lines connected to a gas centrifuge or the like and (2) establishing a recycle path between two on the lines so closed. The value assembly is especially designed to be compact, fast-acting, reliable, and comparatively inexpensive. It provides large reductions in capital costs for gas-centrifuge cascades.

Hahs, C.A.; Rurbage, C.H.

1982-03-17T23:59:59.000Z

246

Accretion in Compact Binaries  

E-Print Network (OSTI)

Compact binaries have long been a paradigm for accretion theory. Much of our present view of how accretion occurs comes directly from the comparison of theory with observations of these sources. Since theory differs little for other objects such as active galaxies, increasing efforts have recently gone into searching for correspondences in observed behaviour. This chapter aims at giving a concise summary of the field, with particular emphasis on new developments since the previous edition of this book. These developments have been significant. Much of the earlier literature implicitly assumed that accreting binaries were fairly steady sources accreting most of the mass entering their vicinity, often with main-sequence companions, and radiating the resulting accretion luminosity in rough isotropy. We shall see that in reality these assumptions fail for the majority of systems. Most are transient; mass ejection in winds and jets is extremely common; a large (sometimes dominant) fraction of even short-period systems have evolved companions whose structure deviates significantly from the zero-age main sequence; and the radiation pattern of many objects is significantly anisotropic. It is now possible to give a complete characterization of the observed incidence of transient and persistent sources in terms of the disc instability model and formation constraints. X-ray populations in external galaxies, particularly the ultraluminous sources, are revealing important new insights into accretion processes and compact binary evolution.

Andrew R. King

2003-01-07T23:59:59.000Z

247

Compact electrostatic comb actuator  

DOE Patents (OSTI)

A compact electrostatic comb actuator is disclosed for microelectromechanical (MEM) applications. The actuator is based upon a plurality of meshed electrostatic combs, some of which are stationary and others of which are moveable. One or more restoring springs are fabricated within an outline of the electrostatic combs (i.e. superposed with the moveable electrostatic combs) to considerably reduce the space required for the actuator. Additionally, a truss structure is provided to support the moveable electrostatic combs and prevent bending or distortion of these combs due to unbalanced electrostatic forces or external loading. The truss structure formed about the moveable electrostatic combs allows the spacing between the interdigitated fingers of the combs to be reduced to about one micron or less, thereby substantially increasing the number of active fingers which can be provided in a given area. Finally, electrostatic shields can be used in the actuator to substantially reduce unwanted electrostatic fields to further improve performance of the device. As a result, the compact electrostatic comb actuator of the present invention occupies only a fraction of the space required for conventional electrostatic comb actuators, while providing a substantial increase in the available drive force (up to one-hundred times).

Rodgers, M. Steven (Albuquerque, NM); Burg, Michael S. (Albuquerque, NM); Jensen, Brian D. (Albuquerque, NM); Miller, Samuel L. (Albuquerque, NM); Barnes, Stephen M. (Albuquerque, NM)

2000-01-01T23:59:59.000Z

248

National Energy Commission (China) | Open Energy Information  

Open Energy Info (EERE)

China) China) Jump to: navigation, search Name National Energy Commission (China) Place Beijing References National Energy Commission (China)[1] No information has been entered for this organization. Add Organization This article is a stub. You can help OpenEI by expanding it. National Energy Commission (China) is a new, high level, 21 member interagency commission based in Beijing, China, and is responsible for China's new energy law (expected 1/1/2011). [2] National Development and Reform Commission, Ministry of Environmental Protection (China) See also Government_policy_and_investment_in_clean_energy_(China) Key Facts Members Li Junfeng, National Development and Reform Commission ____, People's Liberation Army References ↑ "National Energy Commission (China)"

249

STATE OF CALIFORNIA --NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

STATE OF CALIFORNIA -- NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION 1516 Ninth Street Sacramento, California 95814 Main website: www.energy.ca.gov Notice of California Natural Gas Stakeholders Working Group Meeting The Natural Gas Stakeholders Working Group

250

STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY EDMUND G, BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

A NEW GAS TURBINE ENGINE CONCEPT FOR ELECTRICITY GENERATION WITH INCREASED EFFICIENCY AND POWER Prepared For: California Energy Commission Energy Innovations Small Grant Program Prepared By: Department REPORT (FAR) A NEW GAS TURBINE ENGINE CONCEPT FOR ELECTRICITY GENERATION WITH INCREASED EFFICIENCY

251

STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

: Experimental and Numerical Studies in Gas Turbine Heat Transfer ­ Funding support from the Department of Energy and Numerical Studies in Gas Turbine Heat Transfer ­ Funding support from the Department of Energy, the National Regulatory Commission Faculty Development Grant for new faculty start-up funds o initiated a series

252

Available Technologies: Compact Hyperspectral Imager  

Scientists have developed a compact and lightweight optical device that can perform spatially resolved spectroscopy at low levels of visible light. The team led ...

253

Susquehanna River Basin Compact (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

254

METHOD OF FORMING ELONGATED COMPACTS  

DOE Patents (OSTI)

A powder compacting procedure and apparatus which produces elongated compacts of Be is described. The powdered metal is placed in a thin metal tube which is chemically compatible to lubricant, powder, atmosphere, and die material and will undergo a high degree of plastic deformation and have intermediate hardness. The tube is capped and placed in the die, and punches are applied to the ends. During the compacting stroke the powder seizes the tube and a thickening and shortening of the tube occurs. The tube is easily removed from the die, split, and peeled from the compact. (T.R.H.)

Larson, H.F.

1959-05-01T23:59:59.000Z

255

Issues related to setting exemption levels for oil and gas NORM  

Science Conference Proceedings (OSTI)

In the absence of any federal regulations that specifically address the handling and disposal of wastes containing naturally occurring radioactive material (NORM), individual states have taken responsibility for developing their own regulatory programs for NORM. A key issue in developing NORM rules is defining exemption levels--specific levels or concentrations that determine which waste materials are subject to controlled management. In general, states have drawn upon existing standards and guidelines for similar waste types in establishing exemption levels for NORM. Simply adopting these standards may not be appropriate for oil and gas NORM for several reasons. The Interstate Oil and Gas Compact Commission's NORM Subcommittee has summarized the issues involved in setting exemption levels in a report titled ``Naturally Occurring Radioactive Materials (NORM): Issues from the Oil and Gas Point of View''. The committee has also recommended a set of exemption levels for controlled practices and for remediation activities on the basis of the issues discussed.

Blunt, D. L.; Gooden, D. S.; Smith, K. P.

1999-11-12T23:59:59.000Z

256

NPDES permit compliance and enforcement: A resource guide for oil and gas operators  

SciTech Connect

During the fall of 1996, the Interstate Oil and Gas Compact Commission sponsored sessions for government and industry representatives to discuss concerns about the National Pollution Discharge Elimination System (NPDES) program under the Clean Water Act. In January 1997, the NPDES Education/Communication/Training Workgroup (ECT Workgroup) was established with co-leaders from the Environmental Protection Agency (EPA) and industry. The ECT Workgroup`s purpose was to develop ideas that would improve communication between NPDES regulators and the oil and gas industry regarding NPDES compliance issues. The Workgroup focused on several areas, including permit compliance monitoring and reporting, enforcement activity and options, and treatment technology. The ECT Workgroup also discussed the need for materials and information to help NPDES regulatory agency personnel understand more about oil and gas industry exploration and extraction operations and treatment processes. This report represents a compendium of the ECT Workgroup`s efforts.

1998-12-01T23:59:59.000Z

257

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

on energy efficiency through seven core areas: improved efficiency of the hot water distribution system in residential and commercial gas fired hot water heaters. Early results indicate that by using a simple and inexpensive baffle inside the tank, natural gas consumed for hot water heating can be reduced by 5 percent

258

Monitoring and Commissioning Verification Algorithms for CHP Systems  

Science Conference Proceedings (OSTI)

This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

2008-03-31T23:59:59.000Z

259

Oil and gas technology transfer activities and potential in eight major producing states. Volume 1  

Science Conference Proceedings (OSTI)

In 1990, the Interstate Oil and Gas Compact Commission (the Compact) performed a study that identified the structure and deficiencies of the system by which oil and gas producers receive information about the potential of new technologies and communicate their problems and technology needs back to the research community. The conclusions of that work were that major integrated companies have significantly more and better sources of technology information than independent producers. The majors also have significantly better mechanisms for communicating problems to the research and development (R&D) community. As a consequence, the Compact recommended analyzing potential mechanisms to improve technology transfer channels for independents and to accelerate independents acceptance and use of existing and emerging technologies. Building on this work, the Compact, with a grant from the US Department Energy, has reviewed specific technology transfer organizations in each of eight major oil producing states to identify specific R&D and technology transfer organizations, characterize their existing activities, and identify potential future activities that could be performed to enhance technology transfer to oil and gas producers. The profiles were developed based on information received from organizations,follow-up interviews, site visit and conversations, and participation in their sponsored technology transfer activities. The results of this effort are reported in this volume. In addition, the Compact has also developed a framework for the development of evaluation methodologies to determine the effectiveness of technology transfer programs in performing their intended functions and in achieving desired impacts impacts in the producing community. The results of that work are provided in a separate volume.

Not Available

1993-07-01T23:59:59.000Z

260

NIST Blue Ribbon Commission on Management and Safety ? ...  

Science Conference Proceedings (OSTI)

NIST Blue Ribbon Commission on Management and Safety II. The NIST Blue Ribbon Commission on Management and ...

2012-08-27T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

NIST Blue Ribbon Commission on Management and Safety ...  

Science Conference Proceedings (OSTI)

... See NIST Blue Ribbon Commission on Management and Safety II. NIST Blue Ribbon Commission on Management and Safety. ...

2010-10-05T23:59:59.000Z

262

CIM - compact intensity modulation.  

SciTech Connect

Compact intensity modulation (CIM), a new method to modulate the intensity of a neutron beam is demonstrated. CIM allows the production of arbitrary signals where the focus point can be chosen and changed without any constraints. A novel feature in this technique compared to spin echo techniques is that the neutron polarization is kept parallel or anti-parallel to the static fields during the passage through the magnetic fields and the beating pattern at the detector is produced by an amplitude modulation (AM) of the adiabatic RF-spin flippers rather than Larmor precession like in neutron spin echo (NSE) instruments; thus, the achievable contrast is very high and the instrument resolution can be changed very quickly. This gives the fascinating possibility at pulsed neutron sources to sweep the modulation frequency of the flippers in order to increase dynamic resolution range during the same neutron pulse.

Bleuel, M.; Lang, E.; Gahler, G.; Lal, J.; Intense Pulsed Neutron Source; Inst. Lau Langevin

2008-07-21T23:59:59.000Z

263

Compact vacuum insulation embodiments  

DOE Patents (OSTI)

An ultra-thin compact vacuum insulation panel is comprised of two hard, but bendable metal wall sheets closely spaced apart from each other and welded around the edges to enclose a vacuum chamber. Glass or ceramic spacers hold the wall sheets apart. The spacers can be discrete spherical beads or monolithic sheets of glass or ceramic webs with nodules protruding therefrom to form essentially point' or line' contacts with the metal wall sheets. In the case of monolithic spacers that form line' contacts, two such spacers with the line contacts running perpendicular to each other form effectively point' contacts at the intersections. Corrugations accommodate bending and expansion, tubular insulated pipes and conduits, and preferred applications are also included. 26 figs.

Benson, D.K.; Potter, T.F.

1992-04-28T23:59:59.000Z

264

Compact acoustic refrigerator  

DOE Patents (OSTI)

This invention is comprised of a compact acoustic refrigeration system that actively cools components, e.g., electrical circuits, in a borehole environment. An acoustic engine includes first thermodynamic elements for generating a standing acoustic wave in a selected medium. An acoustic refrigerator includes second thermodynamic elements located in the standing wave for generating a relatively cold temperature at a first end of the second thermodynamic elements and a relatively hot temperature at a second end of the second thermodynamic elements. A resonator volume cooperates with the first and second thermodynamic elements to support the standing wave. To accommodate the high heat fluxes required for heat transfer to/from the first and second thermodynamic elements, first heat pipes transfer heat from the heat load to the second thermodynamic elements and second heat pipes transfer heat from first and second thermodynamic elements to the borehole environment.

Bennett, G.A.

1991-12-31T23:59:59.000Z

265

Compact acoustic refrigerator  

DOE Patents (OSTI)

A compact acoustic refrigeration system actively cools components, e.g., electrical circuits, in a borehole environment. An acoustic engine includes first thermodynamic elements for generating a standing acoustic wave in a selected medium. An acoustic refrigerator includes second thermodynamic elements located in the standing wave for generating a relatively cold temperature at a first end of the second thermodynamic elements and a relatively hot temperature at a second end of the second thermodynamic elements. A resonator volume cooperates with the first and second thermodynamic elements to support the standing wave. To accommodate the high heat fluxes required for heat transfer to/from the first and second thermodynamic elements, first heat pipes transfer heat from the heat load to the second thermodynamic elements and second heat pipes transfer heat from first and second thermodynamic elements to the borehole environment. 18 figs.

Bennett, G.A.

1992-11-24T23:59:59.000Z

266

Compact acoustic refrigerator  

DOE Patents (OSTI)

A compact acoustic refrigeration system actively cools components, e.g., electrical circuits (22), in a borehole environment. An acoustic engine (12, 14) includes first thermodynamic elements (12) for generating a standing acoustic wave in a selected medium. An acoustic refrigerator (16, 26, 28) includes second thermodynamic elements (16) located in the standing wave for generating a relatively cold temperature at a first end of the second thermodynamic elements (16) and a relatively hot temperature at a second end of the second thermodynamic elements (16). A resonator volume (18) cooperates with the first and second thermodynamic elements (12, 16) to support the standing wave. To accommodate the high heat fluxes required for heat transfer to/from the first and second thermodynamic elements (12, 16), first heat pipes (24, 26) transfer heat from the heat load (22) to the second thermodynamic elements (16) and second heat pipes (28, 32) transfer heat from first and second thermodynamic elements (12, 16) to the borehole environment.

Bennett, Gloria A. (Los Alamos, NM)

1992-01-01T23:59:59.000Z

267

Compact vacuum insulation  

DOE Patents (OSTI)

An ultra-thin compact vacuum insulation panel is comprised of two hard, but bendable metal wall sheets closely spaced apart from each other and welded around the edges to enclose a vacuum chamber. Glass or ceramic spacers hold the wall sheets apart. The spacers can be discrete spherical beads or monolithic sheets of glass or ceramic webs with nodules protruding therefrom to form essentially point'' or line'' contacts with the metal wall sheets. In the case of monolithic spacers that form line'' contacts, two such spacers with the line contacts running perpendicular to each other form effectively point'' contacts at the intersections. Corrugations accommodate bending and expansion, tubular insulated pipes and conduits, and preferred applications are also included.

Benson, D.K.; Potter, T.F.

1993-01-05T23:59:59.000Z

268

Compact vacuum insulation embodiments  

DOE Patents (OSTI)

An ultra-thin compact vacuum insulation panel is comprised of two hard, but bendable metal wall sheets closely spaced apart from each other and welded around the edges to enclose a vacuum chamber. Glass or ceramic spacers hold the wall sheets apart. The spacers can be discrete spherical beads or monolithic sheets of glass or ceramic webs with nodules protruding therefrom to form essentially "point" or "line" contacts with the metal wall sheets. In the case of monolithic spacers that form "line" contacts, two such spacers with the line contacts running perpendicular to each other form effectively "point" contacts at the intersections. Corrugations accommodate bending and expansion, tubular insulated pipes and conduits, and preferred applications are also included.

Benson, David K. (Golden, CO); Potter, Thomas F. (Denver, CO)

1992-01-01T23:59:59.000Z

269

Compact vacuum insulation  

DOE Patents (OSTI)

An ultra-thin compact vacuum insulation panel is comprised of two hard, but bendable metal wall sheets closely spaced apart from each other and welded around the edges to enclose a vacuum chamber. Glass or ceramic spacers hold the wall sheets apart. The spacers can be discrete spherical beads or monolithic sheets of glass or ceramic webs with nodules protruding therefrom to form essentially "point" or "line" contacts with the metal wall sheets. In the case of monolithic spacers that form "line" contacts, two such spacers with the line contacts running perpendicular to each other form effectively "point" contacts at the intersections. Corrugations accommodate bending and expansion, tubular insulated pipes and conduits, and preferred applications are also included.

Benson, David K. (Golden, CO); Potter, Thomas F. (Denver, CO)

1993-01-01T23:59:59.000Z

270

Compact proton spectrometers for measurements of shock  

Science Conference Proceedings (OSTI)

The compact Wedge Range Filter (WRF) proton spectrometer was developed for OMEGA and transferred to the National Ignition Facility (NIF) as a National Ignition Campaign (NIC) diagnostic. The WRF measures the spectrum of protons from D-{sup 3}He reactions in tuning-campaign implosions containing D and {sup 3}He gas; in this work we report on the first proton spectroscopy measurement on the NIF using WRFs. The energy downshift of the 14.7-MeV proton is directly related to the total {rho}R through the plasma stopping power. Additionally, the shock proton yield is measured, which is a metric of the final merged shock strength.

Mackinnon, A; Zylstra, A; Frenje, J A; Seguin, F H; Rosenberg, M J; Rinderknecht, H G; Johnson, M G; Casey, D T; Sinenian, N; Manuel, M; Waugh, C J; Sio, H W; Li, C K; Petrasso, R D; Friedrich, S; Knittel, K; Bionta, R; McKernan, M; Callahan, D; Collins, G; Dewald, E; Doeppner, T; Edwards, M J; Glenzer, S H; Hicks, D; Landen, O L; London, R; Meezan, N B

2012-05-02T23:59:59.000Z

271

Utah Labor Commission | Open Energy Information  

Open Energy Info (EERE)

Labor Commission Labor Commission Jump to: navigation, search Name Utah Labor Commission Address 160 East 300 South, 3rd Floor Place Salt Lake City, Utah Zip 84114-6600 Phone number (801) 530-6800 Website http://laborcommission.utah.go References Website[1] This article is a stub. You can help OpenEI by expanding it. Utah Labor Commission is an organization based in Salt Lake City, Utah. The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic well-being of employees and employers. It is a multi-division state agency directed by a Commissioner who is appointed by the Governor. The Commissioner oversees the various functions of the divisions within the Commission.

272

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! ☺ ☺ ☺ ☺ ☺ ☺

273

UNITED STATES ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

I(S.0 -01: I(S.0 -01: SPECIAL NUCLEAR MATERIAL LlCEWSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," o. license is hereby issued authorizing the licensee to receive and possess the special nuclear material designated below; to use such special nuclear material for the purpose(s) and at the place(s) designated below; and to transfer such material to persons' authorized to receive it in accordance with the regulations in said Port. This license shall be deemed to contain the conditions specified in Section 70.32(a) of said regulations, and is subject to all applicable rules, regtdations, and orders of the Atomic Energy Commission now or hereafter in

274

AGENCY: Federal Energy Regulatory Commission. ACTION: Order Granting Clarification  

E-Print Network (OSTI)

SUMMARY: In this Order Granting Clarification, the Commission addresses pending requests to clarify Form No. 552, under which natural gas market participants must annually report information regarding physical natural gas transactions that use an index or that contribute to or may contribute to the formation of a gas index. Order No. 704 required market participants to file these reports in order to provide greater transparency concerning the use of indices to price natural gas and how well index prices reflect market forces. Order No. 704-C revises Form No. 552 so as to (1) exempt from reporting any unexercised options to take gas under a take-or-release contract; (2) clarify the definition of exempt unprocessed natural gas transactions as those involving gas that is both not yet processed (to separate and recover natural gas liquids), and still upstream of a processing facility; (3) exempt from reporting cash-out and imbalance transactions, since they were burdensome to report and provided little market information; (4) strike the forms references to the blanket sales certificates issued under 284.402 or 284.284, sinceDocket No. RM07-10-002- 2-they were burdensome to report and provided little market information, so as to also

unknown authors

2010-01-01T23:59:59.000Z

275

The Operation of the Low Pay Commission  

E-Print Network (OSTI)

were the Human Resources Director of a major hotel and catering group, the Human Resources Policy Director (later promoted to Deputy Director-General) of the Confederation of British Industry, and the Chief Executive of a retailers federation... of the Commission, to the Inland Revenue which tackled the task with energy, imagination and common sense. The Government also simplified the Commissions task by prejudging certain aspects of the National Minimum Wage. Particularly important was that it should...

Brown, William

2004-06-16T23:59:59.000Z

276

Regional Districts, Commissions, and Authorities (South Carolina) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Siting and Permitting Provider Regional Districts, Commissions, and Authorities

277

Existing Building Commissioning (EBCx) Project Considerations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Existing Building Existing Building Commissioning (EBCx) Project Considerations Phil Welker, Executive Director PECI 2 Mapping Out Your Commissioning Strategy Three big questions: 1. Which buildings are commissioning candidates? 2. What commissioning approach(es) should I employ? 3. What expertise do I need to get it done? 3 Which buildings? Many factors come in to play: * Building sizes * Project budgets * Current energy performance * Building control systems * Occupancy rates * Operator/ engineering resources * Long term investment strategy * Sustainability plans or mandates * Equipment Replacements Selecting the right buildings is critical to achieve the maximum benefit in a cost-efficient manner. See the EPA's "A Retrocommissioning Guide for Building Owners"

278

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Report to the Governor Final Report to the Governor and the Iowa General Assembly Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and Practices 2 Table of Contents Commission Members page 3 Executive Summary page 4 Summary of Recommendations page 5 Legislative Overview page 12 Profile on Iowa's Energy Usage page 14 Commission Proceedings page 15 Recommendations Energy Code Adoption & Compliance page 20 Financing & Incentives page 25 Training and Education page 29 Licensing and Certification page 31 Additional Energy Efficiency Recommendations page 32

279

Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 Federal Register 23 Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection Activities: Proposed Collection; Comment Request; Election Assistance Commission's Voting System Test Laboratory Program Manual, Version 1.0 AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice; comment request. SUMMARY: As part of its continuing effort to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995, the U.S. Election Assistance Commission (EAC) invites the general public and other Federal agencies to take this opportunity to comment on EAC's request to renew an existing information collection, EAC's Voting System Test Laboratory Program Manual, Version

280

Step 5: Commission the building | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Specify detailed commissioning activities in the project contracts. Ensure that your architect or engineer transfers technical documents to the building's operations and...

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ORLANDO UTILITIES COMMISSION RFP No. 2400 QQ  

NLE Websites -- All DOE Office Websites (Extended Search)

ORLANDO UTILITIES COMMISSION REQUEST FOR PROPOSAL For GREEN ENERGY PROGRAM RFP NO. 2400 OQ COMMISSIONERS LONNIE C. BELL President KATIE PORTA First Vice President MAYLEN DOMINGUEZ...

282

A History of the Atomic Energy Commission  

Energy.gov (U.S. Department of Energy (DOE))

A History of the Atomic Energy Commission - written by Alice L. BuckWashington, D.C.: U.S. Department of Energy, July 1983.41 pp.

283

The Fenno-Skan HVDC link commissioning  

Science Conference Proceedings (OSTI)

The commissioning of the Fenno-Skan HVDC link between Finland and Sweden, with the longest submarine dc cable in the world, is described. The main pre-commissioning activities, important for an efficient commissioning, are discussed together with time schedules and suitable organization forms. The procedures to test special control features, such as subsynchronous oscillation (SSO) damping control are presented. The full scale network interaction tests which are an important part of the commissioning are also discussed. These tests succeeded very well and provided a lot of information about the system behavior for future operation and planning purposes.

Nyman, A. (Swedish State Power Board, Vaellingby (Sweden)); Jaeaeskelaeinen, K.; Vaitomaa, M. (Imatran Voima OY, Vantaa (Finland)); Jansson, B.; Danielsson, K.G. (ABB Power Systems, Ludvika (Sweden))

1994-01-01T23:59:59.000Z

284

County Land Preservation and Use Commissions (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance creates Land Preservation and Use Commissions in each county to provide for the orderly use and development of land, to protect agricultural land from nonagricultural development,...

285

IMAGINE Officially Starts Commissioning | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

The IMAGINE team present for the official start of commissioning. Doug Selby, HFIR instrument coordinator, hands the shutter keys to IMAGINE instrument scientist Flora...

286

SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE  

Science Conference Proceedings (OSTI)

The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

Shishlo, Andrei P [ORNL; Galambos, John D [ORNL

2008-01-01T23:59:59.000Z

287

California Energy Commission - Electricity Consumption by Planning...  

Open Energy Info (EERE)

Planning Area (1990-2009) Electricity consumption data from the California Energy Commission by planning area for Commercial, Residential, Ag & Water Pump, Streetlight,...

288

Nevada Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Nevada Public Utilities Commission Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleNevadaPublic...

289

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cameron LNG, LLC and Cameron LNG, LLC and Docket Nos. CP13-25-000 Cameron Interstate, LLC CP13-27-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CAMERON LIQUEFACTION PROJECT (January 10, 2014) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Cameron Liquefaction Project (Project), proposed by Cameron LNG, LLC and Cameron Interstate Pipeline, LLC (collectively Cameron) in the above-referenced docket. Cameron requests authorization to export 12 million tons of liquefied natural gas (LNG) per year from its terminal in Cameron and Calcasieu Parishes, Louisiana. The draft EIS assesses the potential environmental effects of the construction and

290

Natural Gas Regulation - Other Gas-Related Information Sources | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Regulation - Other Gas-Related Information Sources Natural Gas Regulation - Other Gas-Related Information Sources Natural Gas Regulation - Other Gas-Related Information Sources The single largest source of energy information available is the Department of Energy's Energy Information Administration (EIA). The EIA publishes extensive reports on natural gas and other energy sources. Domestic natural gas markets are regulated in part by the Federal Energy Regulatory Commission. The commission's chief area of concern is the interstate natural gas market. Natural gas moves for the most part by pipeline in the United States. The safety of those pipelines is the concern of the Department of Transportation's Office of Pipeline Safety. In Canada the regulation of interprovincial and international natural gas is the responsibility of the National Energy Board. Their areas of

291

Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future  

Science Conference Proceedings (OSTI)

This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

Brambley, Michael R.; Katipamula, Srinivas

2007-01-31T23:59:59.000Z

292

Compact vacuum insulation  

DOE Patents (OSTI)

Improved compact insulation panel is provided which is comprised of two adjacent metal sheets spaced close together with a plurality of spherical, or other discretely shaped, glass or ceramic beads optimally positioned between the sheets to provide support and maintain the spacing between the metal sheets when the gases therebetween are evacuated to form a vacuum. These spherical glass beads provide the maximum support while minimizing thermal conductance. In its preferred embodiment; these two metal sheets are textured with ribs or concave protrusions in conjunction with the glass beads to maximize the structural integrity of the panels while increasing the spacing between beads, thereby reducing the number of beads and the number of thermal conduction paths. Glass or porcelain-enameled liners in combination with the glass spacers and metal sidewalls effectively decrease thermal conductivity, and variious laminates, including wood, porcelain-enameled metal, and others effectively increase the strength and insulation capabilities of the panels. Also, a metal web is provided to hold the spacers in place, and strategic grooves are shown to accommodate expansion and contraction or shaping of the panels.

Benson, David K. (Golden, CO); Potter, Thomas F. (Denver, CO)

1992-01-01T23:59:59.000Z

293

Compact vacuum insulation  

DOE Patents (OSTI)

Improved compact insulation panel is provided which is comprised of two adjacent metal sheets spaced close together with a plurality of spherical, or other discretely shaped, glass or ceramic beads optimally positioned between the sheets to provide support and maintain the spacing between the metal sheets when the gases there between are evacuated to form a vacuum. These spherical glass beads provide the maximum support while minimizing thermal conductance. In its preferred embodiment; these two metal sheets are textured with ribs or concave protrusions in conjunction with the glass beads to maximize the structural integrity of the panels while increasing the spacing between beads, thereby reducing the number of beads and the number of thermal conduction paths. Glass or porcelain-enameled liners in combination with the glass spacers and metal sidewalls effectively decrease thermal conductivity, and various laminates, including wood, porcelain-enameled metal, and others effectively increase the strength and insulation capabilities of the panels. Also, a metal web is provided to hold the spacers in place, and strategic grooves are shown to accommodate expansion and contraction or shaping of the panels. 35 figs.

Benson, D.K.; Potter, T.F.

1992-10-27T23:59:59.000Z

294

Initial commissioning results with the NSCL Electron Beam Ion Trap  

Science Conference Proceedings (OSTI)

The ReA reaccelerator is being added to the National Superconducting Cyclotron Laboratory (NSCL) fragmentation facility in order to provide exotic rare-isotope beams, not available at the Isotope Separation On-Line facilities, in the several-MeV/u energy range. The first stage of the NSCL reaccelerator complex, consisting of an EBIT charge breeder, a room-temperature radiofrequency quadrupole (RFQ) accelerator, and superconducting linear accelerator modules, has been completed and is being put into operation. Commissioning of the EBIT has started by extracting charge-bred residual gas ions, ions created from a Ne gas jet directed across the EBIT's electron beam and ions captured from an external test ion source. Charge-bred ions from the Ne gas jet have been extracted as a pulse and accelerated through the RFQ and the two cryomodules.

Schwarz, S.; Kittimanapun, K.; Lapierre, A.; Leitner, D.; Ottarson, J.; Portillo, M. [National Superconducting Cyclotron Laboratory, NSCL, Michigan State University, East Lansing, Michigan 48824 (United States); Bollen, G. [National Superconducting Cyclotron Laboratory, NSCL, Michigan State University, East Lansing, Michigan 48824 (United States); Department of Physics and Astronomy, Michigan State University, East Lansing, Michigan 48824 (United States); Lopez-Urrutia, J. R. Crespo [Max-Planck Institut fuer Kernphysik, Saupfercheckweg 1, 69117 Heidelberg (Germany); Kester, O. [GSI Helmholtzzentrum fuer Schwerionenforschung, Planckstr. 1, 64291 Darmstadt (Germany)

2012-02-15T23:59:59.000Z

295

Underground Storage of Natural Gas (Kansas)  

Energy.gov (U.S. Department of Energy (DOE))

Any natural gas public utility may appropriate for its use for the underground storage of natural gas any subsurface stratum or formation in any land which the commission shall have found to be...

296

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: 1 Energy Commission

297

Canadian River Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Savings Canadian River Compact (Texas) Canadian River Compact (Texas) Eligibility Utility Fed. Government Commercial...

298

Rio Grande Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rio Grande Compact (Texas) Rio Grande Compact (Texas) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility StateProvincial Govt Industrial...

299

Implementation Update Black and Gold Commission  

E-Print Network (OSTI)

Implementation Update Black and Gold Commission June, 2003 1 Action Item/ Major Initiative Outcomes Policies and Practices of UWM with principles and goals of Black & Gold Commission UWM culture supports Senate; Student Association; Classified Employee Groups; Deans & Division Heads Spirit of the Black

Saldin, Dilano

300

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

for solar energy by dramatically reducing the cost of solar. As part of the statewide solar effort, the CPUC of the state's solar offerings, such as the California Energy Commission's (Energy Commission) New Solar Homes Renewable Energy Council (IREC) released Larry Sherwood's U.S. Solar Market Trends for 2007 report

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Commissioning of the T2K Beamline  

Science Conference Proceedings (OSTI)

The initial commissioning of the beam line for the T2K long baseline neutrino experiment was carried out in April and May of 2009. This paper contains an overview of the beam line components and presents initial results from the beam line commissioning.

Hartz, Mark [Department of Physics, University of Toronto, 60 St. George St., Toronto, M5S 1A7, Ontario (Canada)

2010-03-30T23:59:59.000Z

302

California Energy Commission DRAFT COMMITTEE REPORT  

E-Print Network (OSTI)

of the Energy Commission until the report is adopted. #12;i ABSTRACT These proposed electricity supply forms demand for energy and annual peak load will be met by specific supply resources. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CTD. #12;ii #12

303

Control System Commissioning for Enhanced Building Operations  

E-Print Network (OSTI)

This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems that can impact a commissioning exercise.

Salsbury, T. I.; Singhal, A.

2003-01-01T23:59:59.000Z

304

The 'Supply-of-Storage' for Natural Gas in California  

E-Print Network (OSTI)

Commission. (2002). Natural Gas Supply and Infrastructure013 THE SUPPLY-OF-STORAGE FOR NATURAL GAS IN CALIFORNIATHE SUPPLY-OF-STORAGE FOR NATURAL GAS IN CALIFORNIA Roco

Uria, Rocio; Williams, Jeffrey

2005-01-01T23:59:59.000Z

305

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

. We can rule out warps as the source of the observed high-z dust. Flaring gas layers seem an unlikely-ups are taken from the unsharp-masked V -band images. The ID for each feature is given in a slightly compressed

306

TATE OF CALIFORNI NERGY COMMISSION  

E-Print Network (OSTI)

in response to AB 970 in an effort to provide additional assistance to potential thermal power plant will require. A convention 500 MW thermal combined cycle gas-fired power plant in California may consume from 2 supplies to meet the needs of a new power plant. A variety of water sources are available for new power

307

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

, California · Pixley Biogas ­ Pixley, California · High Mountain Fuels Simi Valley Bio-Liquefied Natural Gas production, increases the volume of biogas production, increases the biomethane content of the biogas from surrounding agriculture-related industries. The conditioned biogas will be injected

308

A Practical Guide for Commissioning Existing Buildings  

SciTech Connect

Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

Haasl, T.; Sharp, T.

1999-04-01T23:59:59.000Z

309

A catalog of compact groups of galaxies in the RSDSS commissioning data  

E-Print Network (OSTI)

Propulsion Laboratory, at the California Institute of Technology, under contract with the National Aeronautics and Space

2003-01-01T23:59:59.000Z

310

New considerations for compact cyclotrons  

E-Print Network (OSTI)

A compact cyclotron built with superconducting magnets could be a transformative solution to many scientific problems facing the defense, medical, and energy industries today. This thesis discusses three potential applications ...

Marshall, Eric S. (Eric Scott)

2012-01-01T23:59:59.000Z

311

Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future  

SciTech Connect

This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2011-08-16T23:59:59.000Z

312

Department of Energy Awards Eddy/Lea Regional Commission $300...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EddyLea Regional Commission 300,000 Grant Department of Energy Awards EddyLea Regional Commission 300,000 Grant Department of Energy Awards EddyLea Regional Commission...

313

California Energy Commission Library Recent Acquisitions January March 2012  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions January ­ March 2012 AIR: California Public Utilities Commission Conference: CPUC Energy Symposium (1980: Stanford University) Publisher: California Public Utilities Commission Year: 1980 Call number: B.65/E5682/1980 The very

314

California Energy Commission Library Recent Acquisitions October December 2011  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions October ­ December 2011, Charles; Roberts, Miles Corp. Author: California Energy Commission, Emerging Fuels and Technologies Office Publisher: California Energy Commission Year: 2011 Call number: INTERNET CEC Pub. #: CEC

315

Commissioning and early experiments of the PHELIX facility  

E-Print Network (OSTI)

009-3855-7 Commissioning and early experiments of the PHELIXthe recent years, the commissioning and operation of high-paper, we report on the commissioning of the PHELIX facility

2010-01-01T23:59:59.000Z

316

Regulatory Commission of Alaska | Open Energy Information  

Open Energy Info (EERE)

Regulatory Commission of Alaska Regulatory Commission of Alaska Jump to: navigation, search Logo: Regulatory Commission of Alaska Name Regulatory Commission of Alaska Address 701 West Eight Ave., Suite 300 Place Anchorage, Alaska Zip 99501-3469 Phone number 907-276-6222 Website http://rca.alaska.gov/RCAWeb/h Coordinates 61.2143463°, -149.8931523° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.2143463,"lon":-149.8931523,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

317

Federal Energy Regulatory Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Regulatory Commission Energy Regulatory Commission Jump to: navigation, search Logo: Federal Energy Regulatory Commission Name Federal Energy Regulatory Commission Address 888 First Street, N.E. Place Washington, District of Columbia Zip 20426 Phone number 1-866-208-3676 Website http://www.ferc.gov/contact-us Coordinates 38.90145°, -77.006248° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90145,"lon":-77.006248,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

318

Texas Historical Commission | Open Energy Information  

Open Energy Info (EERE)

Historical Commission Historical Commission Jump to: navigation, search Logo: Texas Historical Commission Name Texas Historical Commission Address 1511 Colorado St. Place Austin, Texas Zip 78701 Year founded 1953 Phone number 512.463.6100 Website http://www.thc.state.tx.us/ Coordinates 30.2779484°, -97.7403973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2779484,"lon":-97.7403973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

319

Retro-Commissioning Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Program Retro-Commissioning Program Retro-Commissioning Program < Back Eligibility Commercial Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Maximum Rebate $200,000 per site per calendar year $400,000 per customer per calendar year for all Focus incentives Program Info Funding Source Focus on Energy Program Start Date 09/01/2012 State Wisconsin Program Type State Rebate Program Rebate Amount $0.08/kWh or $0.50/therm saved for installed measures Focus on Energy offers financial incentives to eligible business customers to retro-commission buildings to optimize performance. The program provides incentives for building efficiency studies based on the size of the

320

LINE Commission Visits Idaho National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NUCLEAR REGULATORY,.COMMISSION REGION I  

Office of Legacy Management (LM)

REGULATORY,.COMMISSION REGULATORY,.COMMISSION REGION I lY,.COMMISSION 475 ALLENDALE ROAD KlNG OF PRUSSIA. PENNSYLVANIA 194061415 GION I NOALE ROAD ENNSYLVANlA 194061415 MAY I5 1996 MAY I5 1996 Docket No. 040-07964 License No. SlJ (Rs Heyman Properties Attention: Mr. John S. Russo Facility Manager 333 Post Road West Westport, CT 06881 SUBJECT: INSPECTION NO. 040-07964/96-001 Dear Mr. Russo: On April 15, 1996, Todd J. Jackson of this office conducted a routine inspection at 737 Canal Street, Stamford, Connecticut of activities o Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The inspection consisted of observations by the inspect0 interviews with personnel, and a radiological survey by the inspector Jackson was accompanied on this inspection by representatives of the

322

California Energy Commission COMMITTEE FINAL REPORT  

E-Print Network (OSTI)

of the California Energy Commission's Strategic Transmission Planning Office, Electricity Analysis Office electric transmission system facilities on their bulk transmission network and on specific projects Policy Report and the 2011 Strategic Transmission Investment Plan. Keywords: Electric transmission, bulk

323

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the California Energy Commission's Strategic Transmission Planning Office, Electricity Analysis Office electric transmission system facilities on their bulk transmission network and on specific projects and the 2011 Strategic Transmission Investment Plan. Keywords: Electric transmission, bulk electric

324

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report July 2008 #12;California Solar Initiative, CPUC Staff Progress Report, July 2008: Zerull Location: San Rafael, CA System size: 14 kW Funded by the California Solar Initiative

325

California Public Utilities Commission California Solar Initiative  

E-Print Network (OSTI)

California Public Utilities Commission California Solar Initiative Program Handbook September 2012Power #12;Table of Contents i California Solar Initiative Program Handbook September 2012 1. Introduction: California Solar Initiative Program....................................................................1 1

326

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report January 2008 #12;California Solar Initiative, CPUC Staff Progress Report, January 2008 This page intentionally left blank. #12;California Solar Initiative, CPUC Staff Progress Report, January 2008 Table of Contents

327

Forestry Commission Scotland 231 Corstorphine Road  

E-Print Network (OSTI)

development - Forestry - Sustainable development - Renewable Energy - Community development - Financial Forestry Sustainable development Renewable Energy Community development Financial management Housing, ethnicity, gender, marital status, religion, sexuality and transgender. #12;Annex 1: FORESTRY COMMISSION

328

ALICE Commissioning: Getting Ready for Physics  

E-Print Network (OSTI)

ALICE is a general-purpose heavy-ion detector at the CERN LHC. We describe the commissioning activities in the years 2007-2009 and the status of the different subsystems at the time of this conference.

C. Lippmann; for the ALICE collaboration

2009-05-11T23:59:59.000Z

329

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity) ................................................................ 19 Supply Form S2: Energy Balance Table ...................... California Energy Commission DRAFT STAFF REPORT FORMS AND INSTRUCTIONS FOR SUBMITTING

330

Checkout, Testing, and Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The CP RM Module is a tool that assists DOE federal project review teams in evaluating the sufficiency of the Commissioning Plan and its implementation. The CP RM can be used by the DOE federal...

331

California Energy Commission - Electricity Consumption by County  

Open Energy Info (EERE)

County (2006-2009) Electricity consumption data from the California Energy Commission sorted by County for Residential and Non-residential from 2006 to 2009.


...

332

Delmarva - Commissioning and Operations Incentive Programs (Maryland...  

Open Energy Info (EERE)

Construction: up to 8,000 (design); 8,000 (commissioning); 6,000 (analysistesting) Energy Savings Study Incentive: Additional 75% of cost, up to 20,000 Operations and...

333

Nevada State Environmental Commission | Open Energy Information  

Open Energy Info (EERE)

Environmental Commission Environmental Commission Jump to: navigation, search Logo: Nevada State Environmental Commission Name Nevada State Environmental Commission Address 901 South Stewart Street, Suite 4001 Place Carson City, Nevada Zip 89701 Website http://www.sec.nv.gov/ Coordinates 39.1580849°, -119.7644949° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1580849,"lon":-119.7644949,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

334

Electronic Forms & Pen Computers Improve Building Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Forms & Pen Computers Improve Building Commissioning Speaker(s): Rich Sydlowski Date: August 8, 2001 - 12:00pm Location: Bldg. 90 Seminar HostPoint of Contact:...

335

Avista Utilities (Gas)- Residential Energy Efficiency Rebate Programs  

Energy.gov (U.S. Department of Energy (DOE))

'''The Washington Utilities and Transportation Commission are currently reviewing the status of natural gas rebate programs. Changes to the program are expected on May 1, 2013. Contact Avista...

336

Natural Gas Retail Unbundling - Kansas - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Overview: The Kansas Corporation Commission began a general investigation into unbundling the State's natural gas industry in 1999. On February 10, 1999 ...

337

The Evolution of Galaxies in Compact Groups  

E-Print Network (OSTI)

We present the analysis of the spectra of 62 galaxies in 15 compact groups. The galaxies were classified in four activity classes: galaxies without emission, starburst nucleus galaxies (SBNGs), luminous AGNs and low-luminosity AGNs (LLAGNs). The star formation in the HCG starbursts is more intense than in normal spirals, but comparable to those in the field SBNGs. Their mean gas metallicity is solar and they do not follow the metallicity-luminosity relation traced by the early-type SBNGs in the field, suggesting that most of them are late-type SBNGs. This morphology preference coupled to the observation that the HCG starbursts are predominantly in the halo of the groups is consistent with the idea that compact groups are embedded in sparser structures. The stellar metallicities of the non starburst galaxies are relatively high for their luminosities. In these galaxies the equivalent widths of the metal absorption lines are slightly narrower than normal while the Balmer absorption lines are relatively strong. All these galaxies could be ``post-starburst'' at an advanced stage of evolution. Our observations are supporting a scenario where the core of the groups are slowly collapsing evolved systems embedded in more extended structures (Ribeiro et al. 1998). In the core of the groups, the interactions were more frequent and the galaxies evolved at a more rapid rate than in their halos.

Roger Coziol; Reinaldo R. de Carvalho; Hugo V. Capelato; Andre L. B. Ribeiro

1998-05-30T23:59:59.000Z

338

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects  

E-Print Network (OSTI)

Buildings. California Commissioning Collaborative. Haasl,2006b. California Commissioning Guide: Existing Buildings.California Commissioning Collaborative. Haves, P. , and

Mills, Evan

2009-01-01T23:59:59.000Z

339

California Energy Commission - Natural Gas Consumption by Planning...  

Open Energy Info (EERE)

Residential, Ag & Water Pump, Streetlight, Industry, Mining & Construction and Total Usage. 2010-12-21T23:20:57Z 2011-01-10T17:20:40Z I accessed this dataset from a public...

340

Building commissioning: The key to quality assurance  

SciTech Connect

This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

1998-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Department of Energy and Nuclear Regulatory Commission Increase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to...

342

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

343

Public Service Commission of Wisconsin | Open Energy Information  

Open Energy Info (EERE)

Public Service Commission of Wisconsin Jump to: navigation, search Name Public Service Commission of Wisconsin Address 610 North Whitney Way Place Madison, Wisconsin Zip 53707-7854...

344

Monitoring-based HVAC Commissioning of an Existing Office Building...  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiency Title Monitoring-based HVAC Commissioning of an Existing Office Building for Energy...

345

TMS/ASM Joint Commission on Metallurgical Transactions  

Science Conference Proceedings (OSTI)

TMS/ASM Joint Commission on Metallurgical Transactions. The function of the Joint Commission is as follows: Consistent with the Purpose and Scope of...

346

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (2010) Contains data from the California Energy Commission on weekly refinery production and stock...

347

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (2000) Contains data from the California Energy Commission on weekly refinery production and stock...

348

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (1999) Contains data from the California Energy Commission on weekly refinery production and stock...

349

Update on Blue Ribbon Commission for America's Nuclear Future...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Future Update on Blue Ribbon Commission for America's Nuclear Future BRC-SEAB-October-12%202011.pdf More Documents & Publications Blue Ribbon Commission on America's...

350

Energy Department and French Commission on Atomic Energy and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Energy Department and French Commission on Atomic...

351

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...

352

Including Retro-Commissioning in Federal Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

11.2 Retro-Cx in Federal ESPCs Including Retro-Commissioning In Federal Energy Saving Performance Contracts Retro-commissioning generally reduces operating and maintenance costs,...

353

Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...  

National Nuclear Security Administration (NNSA)

Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Atomic Energy Commission Explores Peaceful Uses of ... Atomic Energy Commission Explores Peaceful...

354

PP-03 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PP-03 Federal Power Commission More Documents & Publications PP-35 Trico...

355

PP-13 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PP-13 Federal Power Commission More Documents & Publications PP-231...

356

Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuels Fuels Taxation Study Commission to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Taxation Study Commission

357

Compact orthogonal NMR field sensor  

DOE Patents (OSTI)

A Compact Orthogonal Field Sensor for emitting two orthogonal electro-magnetic fields in a common space. More particularly, a replacement inductor for existing NMR (Nuclear Magnetic Resonance) sensors to allow for NMR imaging. The Compact Orthogonal Field Sensor has a conductive coil and a central conductor electrically connected in series. The central conductor is at least partially surrounded by the coil. The coil and central conductor are electrically or electro-magnetically connected to a device having a means for producing or inducing a current through the coil and central conductor. The Compact Orthogonal Field Sensor can be used in NMR imaging applications to determine the position and the associated NMR spectrum of a sample within the electro-magnetic field of the central conductor.

Gerald, II, Rex E. (Brookfield, IL); Rathke, Jerome W. (Homer Glen, IL)

2009-02-03T23:59:59.000Z

358

Ultra-compact Marx-type high-voltage generator  

DOE Patents (OSTI)

An ultra-compact Marx-type high-voltage generator includes individual high-performance components that are closely coupled and integrated into an extremely compact assembly. In one embodiment, a repetitively-switched, ultra-compact Marx generator includes low-profile, annular-shaped, high-voltage, ceramic capacitors with contoured edges and coplanar extended electrodes used for primary energy storage; low-profile, low-inductance, high-voltage, pressurized gas switches with compact gas envelopes suitably designed to be integrated with the annular capacitors; feed-forward, high-voltage, ceramic capacitors attached across successive switch-capacitor-switch stages to couple the necessary energy forward to sufficiently overvoltage the spark gap of the next in-line switch; optimally shaped electrodes and insulator surfaces to reduce electric field stresses in the weakest regions where dissimilar materials meet, and to spread the fields more evenly throughout the dielectric materials, allowing them to operate closer to their intrinsic breakdown levels; and uses manufacturing and assembly methods to integrate the capacitors and switches into stages that can be arranged into a low-profile Marx generator.

Goerz, David A. (Brentwood, CA); Wilson, Michael J. (Modesto, CA)

2000-01-01T23:59:59.000Z

359

Valve for gas centrifuges  

DOE Patents (OSTI)

The invention is a pneumatically operated valve assembly for simultaneously (1) closing gas-transfer lines connected to a gas centrifuge or the like and (2) establishing a recycle path between two of the lines so closed. The valve assembly is especially designed to be compact, fast-acting, reliable, and comparatively inexpensive. It provides large reductions in capital costs for gas-centrifuge cascades.

Hahs, Charles A. (Oak Ridge, TN); Burbage, Charles H. (Oak Ridge, TN)

1984-01-01T23:59:59.000Z

360

Oilfield Flare Gas Electricity Systems (OFFGASES Project)  

Science Conference Proceedings (OSTI)

The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas that is only 4% the strength of natural gas. The cost of producing oil is to a large extent the cost of electric power used to extract and deliver the oil. Researchers have identified stranded and flared gas in California that could generate 400 megawatts of power, and believe that there is at least an additional 2,000 megawatts that have not been identified. Since California accounts for about 14.5% of the total domestic oil production, it is reasonable to assume that about 16,500 megawatts could be generated throughout the United States. This power could restore the cost-effectiveness of thousands of oil wells, increasing oil production by millions of barrels a year, while reducing emissions and greenhouse gas emissions by burning the gas in clean distributed generators rather than flaring or venting the stranded gases. Most turbines and engines are designed for standardized, high-quality gas. However, emerging technologies such as microturbines have increased the options for a broader range of fuels. By demonstrating practical means to consume the four gas streams, the project showed that any gases whose properties are between the extreme conditions also could be utilized. The economics of doing so depends on factors such as the value of additional oil recovered, the price of electricity produced, and the alternate costs to dispose of stranded gas.

Rachel Henderson; Robert Fickes

2007-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

STATE OF CALIFORNIA --NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

STATE OF CALIFORNIA -- NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION 1516 Ninth Street Sacramento, California 95814 Main website: www.energy.ca.gov Notice of major energy trends and issues facing California's electricity, natural gas, and transportation fuel

362

BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION OF THE STATE OF CALIFORNIA  

E-Print Network (OSTI)

thermal electric power plants, 50 MW and greater, in California. The Energy Commission facility of proposed power plants and all related facilities such as electric transmission lines and natural gas and water pipelines. #12;3 Purpose of the Informational Hearing The power plant licensing process, which

363

BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION OF THE STATE OF CALIFORNIA  

E-Print Network (OSTI)

efficiency includes the turbine inlet temperature, compressor and turbine adiabatic efficiencies, recuperator, electromagnetic and nuclear radiation fields. Given these limitations, the helium closed-cycle gas turbine (CCGT. CCGT development began over sixty years ago with the commissioning of the fossil-fired Pioneer plant

364

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

: Nancy Tronaas, Compliance Project Manager SUBJECT: Sycamore Cogeneration Project (84-AFC-6C) Staff the Sycamore Cogeneration Company (SCC), to amend the Energy Commission Decision for the Sycamore Cogeneration existing cogeneration units (i.e., natural gas fired combustion turbines equipped with dry Low NOx

365

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

366

Compact monolithic capacitive discharge unit  

DOE Patents (OSTI)

A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

2007-06-26T23:59:59.000Z

367

Compact Totally Disconnected Moufang Buildings  

E-Print Network (OSTI)

Let $\\Delta$ be a spherical building each of whose irreducible components is infinite, has rank at least 2 and satisfies the Moufang condition. We show that $\\Delta$ can be given the structure of a topological building that is compact and totally disconnected precisely when $\\Delta$ is the building at infinity of a locally finite affine building.

Grundhofer, T; Van Maldeghem, H; Weiss, R M

2010-01-01T23:59:59.000Z

368

Identification, Verification, and Compilation of Produced Water Management Practices for Conventional Oil and Gas Production Operations  

Science Conference Proceedings (OSTI)

The project is titled 'Identification, Verification, and Compilation of Produced Water Management Practices for Conventional Oil and Gas Production Operations'. The Interstate Oil and Gas Compact Commission (IOGCC), headquartered in Oklahoma City, Oklahoma, is the principal investigator and the IOGCC has partnered with ALL Consulting, Inc., headquartered in Tulsa, Oklahoma, in this project. State agencies that also have partnered in the project are the Wyoming Oil and Gas Conservation Commission, the Montana Board of Oil and Gas Conservation, the Kansas Oil and Gas Conservation Division, the Oklahoma Oil and Gas Conservation Division and the Alaska Oil and Gas Conservation Commission. The objective is to characterize produced water quality and management practices for the handling, treating, and disposing of produced water from conventional oil and gas operations throughout the industry nationwide. Water produced from these operations varies greatly in quality and quantity and is often the single largest barrier to the economic viability of wells. The lack of data, coupled with renewed emphasis on domestic oil and gas development, has prompted many experts to speculate that the number of wells drilled over the next 20 years will approach 3 million, or near the number of current wells. This level of exploration and development undoubtedly will draw the attention of environmental communities, focusing their concerns on produced water management based on perceived potential impacts to fresh water resources. Therefore, it is imperative that produced water management practices be performed in a manner that best minimizes environmental impacts. This is being accomplished by compiling current best management practices for produced water from conventional oil and gas operations and to develop an analysis tool based on a geographic information system (GIS) to assist in the understanding of watershed-issued permits. That would allow management costs to be kept in line with the specific projects and regions, which increases the productive life of wells and increases the ultimate recoverable reserves in the ground. A case study was conducted in Wyoming to validate the applicability of the GIS analysis tool for watershed evaluations under real world conditions. Results of the partnered research will continue to be shared utilizing proven methods, such as on the IGOCC Web site, preparing hard copies of the results, distribution of documented case studies, and development of reference and handbook components to accompany the interactive internet-based GIS watershed analysis tool. Additionally, there have been several technology transfer seminars and presentations. The goal is to maximize the recovery of our nation's energy reserves and to promote water conservation.

Rachel Henderson

2007-09-30T23:59:59.000Z

369

Pilot Test of Bauxite Residue Carbonation With Flue Gas  

Science Conference Proceedings (OSTI)

... of bauxite residue in water with flue gas, produced from direct oil burning. ... New Development Model for Bauxite Deposits - Dedicated Compact Refinery.

370

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Kern River Cogeneration

371

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Crockett Cogeneration

372

Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit  

SciTech Connect

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

NONE

1997-02-14T23:59:59.000Z

373

NIST Blue Ribbon Commission on Management and Safety  

Science Conference Proceedings (OSTI)

... the Nuclear Regulatory Commission; the ... response; Environmental safety; Environmental remediation; and Security for hazardous ...

2013-06-12T23:59:59.000Z

374

PEPCO - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Commissioning: 50% of cost Enhanced Commissioning: $20,000 Energy Savings Study Incentive: $20,000 All Incentives: $250,000/account/year for custom, prescriptive, commissioning and O&M Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $12,000 or $0.06/sq. ft.

375

SPALL FRACTURE AND SPALL FRACTURE AND COMPACTION COMPACTION  

National Nuclear Security Administration (NNSA)

SPALL FRACTURE AND SPALL FRACTURE AND SPALL FRACTURE AND SPALL FRACTURE AND COMPACTION COMPACTION IN NATURAL URANIUM IN NATURAL URANIUM UNDER SHOCK UNDER SHOCK - - WAVE LOADING WAVE LOADING O.A. O.A. Tyupanova Tyupanova , S.S. , S.S. Nadezhin Nadezhin , A.N. , A.N. Malyshev Malyshev , , O.N. O.N. Ignatova Ignatova , V.I. , V.I. Skokov Skokov , V.N. , V.N. Knyazev Knyazev , , V.A. V.A. Raevsky Raevsky , N.A. , N.A. Yukina Yukina Russian Federal Nuclear Center Russian Federal Nuclear Center - - VNIIEF, VNIIEF, Sarov Sarov , Russia , Russia Introduction Introduction  Nucleation and growth of defects inside a solid under pulse tensile stresses signify a necessity to consider it as a damaged medium.  A certain volume of experimental data, obtained in correct tests, which are sensitive to a characteristic under study, is necessary

376

California State Lands Commission | Open Energy Information  

Open Energy Info (EERE)

Lands Commission Lands Commission Jump to: navigation, search Name California State Lands Commission Address 100 Howe Ave., Suite 100 South Place Sacramento, California Zip 95825-8282 Phone number 916-574-1900 Website http://www.slc.ca.gov/ Coordinates 38.5653989°, -121.4075812° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5653989,"lon":-121.4075812,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

377

Illinois Commerce Commission | Open Energy Information  

Open Energy Info (EERE)

Commerce Commission Commerce Commission Jump to: navigation, search Name Illinois Commerce Commission Place Springfield, Illinois Zip 62701 Product Regulator of public utilities and transportation in Illinois. Coordinates 42.640925°, -88.413644° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.640925,"lon":-88.413644,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

378

Hutchinson Utilities Commission - Commercial Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hutchinson Utilities Commission - Commercial Energy Efficiency Hutchinson Utilities Commission - Commercial Energy Efficiency Program Hutchinson Utilities Commission - Commercial Energy Efficiency Program < Back Eligibility Commercial Fed. Government Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Other Heat Pumps Commercial Lighting Lighting Manufacturing Maximum Rebate $2,000 Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount Lighting: $300 per kW saved LED Exit Signs: $12 Occupancy Sensors: $20 - $40 Air Conditioning Systems: $20 - $40 per ton Air-Source Heat Pumps: $65 - $150 per ton Geothermal Heat Pumps: $150 per ton Chillers: $3,000 - $4,000, depending on size Chilled Water Resets: $350 - $900, depending on type and size

379

Utah Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Utah Public Service Commission Utah Public Service Commission Name Utah Public Service Commission Address 160 East 300 South Place Salt Lake City, Utah Zip 84114 Phone number 801.530.6716 Website http://www.psc.utah.gov/index. Coordinates 40.7627771°, -111.8866213° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7627771,"lon":-111.8866213,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

380

Example Retro-Commissioning Statement of Work  

NLE Websites -- All DOE Office Websites (Extended Search)

11.3 11.3 Example Retro-Cx Scope of Work Example Retro-Commissioning Scope of Work To Include Services As Part of Super ESPC Detailed Energy Survey Background Agency requests that ESCo perform retro-commissioning services 1 , as detailed herein, as a part of performing the Detailed Energy Survey (DES) for site. The incremental cost for these services will be covered as a part of the project development cost for the Super ESPC project, whether or not viable measures are identified and ultimately implemented. It is the intent of the Agency to expand the work that will be performed during the DES. Leveraging the DES to complete a thorough scoping of retro-commissioning opportunities will substantially enhance the value of the ESCO services by ensuring that

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Michigan Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search State Michigan Name Michigan Public Service Commission Address 6545 Mercantile Way, Suite 7 City, State Lansing, MI Zip 48911 Website http://www.michigan.gov/mpsc/ Coordinates 42.663692°, -84.535225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.663692,"lon":-84.535225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

382

Idaho Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Idaho Public Utilities Commission Address P.O. Box 83720 Place Boise, ID Zip 83720 Website http://www.puc.idaho.gov Coordinates 43.6175293°, -116.2003704° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.6175293,"lon":-116.2003704,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

383

Hawaii Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Jump to: navigation, search Name Hawaii Public Utility Commission Address 465 South King Street #103 Place Honolulu, Hawaii Zip 96813 Coordinates 21.3053513°, -157.85857° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.3053513,"lon":-157.85857,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

384

Oregon Public Utility Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Oregon Public Utility Commission Address 550 Capitol Street N.E. Suite 215 Place Salem, Oregon Zip 97301-2551 Number of employees 51-200 Phone number 503-373-7394 Website http://www.oregon.gov/PUC/Page Coordinates 44.941989°, -123.025697° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.941989,"lon":-123.025697,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

385

Using Building Control System for Commissioning  

E-Print Network (OSTI)

This paper summarizes the different approaches developed during Annex 40 (research project of International Energy Agency - Energy Conservation in Buildings & Community Systems ) for carrying out commissioning activities using the control system. During our work we have found that control systems in buildings have the potential to greatly improve the commissioning process. In particular, control systems can be used to carry out automated testing on the energy systems in a building in a systematic way. Technologies for carrying out automated commissioning are still in their infancy and very few tools are available for practitioners to use. However, our work has demonstrated that tools can be built using existing infrastructure at relatively low cost. In many cases, tools are software programs that can be implemented on most microprocessor-based platforms.

Vaezi-Nejad, H.; Salsbury, T.; Choiniere, D.

2004-01-01T23:59:59.000Z

386

Charlton Compact Power Ltd | Open Energy Information  

Open Energy Info (EERE)

Charlton Compact Power Ltd Charlton Compact Power Ltd Jump to: navigation, search Name Charlton Compact Power Ltd Place Frome, England, United Kingdom Zip BA11 2RH Sector Biomass Product A joint venture between A. J. Charlton & Sons and Compact Power to develop a 3.6MW to 4.5MW biomass plant in Somerset. References Charlton Compact Power Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Charlton Compact Power Ltd is a company located in Frome, England, United Kingdom . References ↑ "Charlton Compact Power Ltd" Retrieved from "http://en.openei.org/w/index.php?title=Charlton_Compact_Power_Ltd&oldid=343457" Categories: Clean Energy Organizations Companies Organizations

387

Compact High-Temperature Superconducting Cable Wins ' ...  

Science Conference Proceedings (OSTI)

Compact High-Temperature Superconducting Cable Wins 'R&D 100' Award. From NIST Tech Beat: June 22, 2011. ...

2011-07-06T23:59:59.000Z

388

Commissioning of the ATLAS Pixel Detector  

E-Print Network (OSTI)

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008. It is currently in a commissioning phase using cosmic-ray events. We present the highlights of the past and future commissioning activities of the ATLAS pixel system.

J. -F. Arguin; for the ATLAS Pixel Collaboration

2008-10-16T23:59:59.000Z

389

LHCb commissioning and readiness for first data  

E-Print Network (OSTI)

LHCb has been installed by spring 2008, followed by intensive testing and commissioning of the system in order to be ready for first data taking. Despite the horizontal geometry of the LHCb detector it was possible to collect over one million useful cosmic events that allowed a first time alignment of the sub-detectors. Moreover events from beam dumps during the LHC synchronisation tests provided very useful data for further time and spacial alignment of the detector. Here we present an overview of our commissioning activities, the current status and an outlook on the startup in 2009.

Helge Voss; for the LHCb Collaboration

2009-06-08T23:59:59.000Z

390

The Atomic Energy Commission By Alice Buck  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atomic Energy Atomic Energy Commission By Alice Buck July 1983 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction Almost a year after World War II ended, Congress established the United States Atomic Energy Commission to foster and control the peacetime development of atomic science and technology. Reflecting America's postwar optimism, Congress declared that atomic energy should be employed not only in the Nation's defense, but also to promote world peace, improve the public welfare, and strengthen free competition in private

391

NETL: Oil & Natural Gas Technologies Reference Shelf - Presentation on  

NLE Websites -- All DOE Office Websites (Extended Search)

Decreasing Air Emission Impacts From Oil and Gas Development Decreasing Air Emission Impacts From Oil and Gas Development Decreasing Air Emission Impacts From Oil and Gas Development Authors: Charles B. McComas, PE; J. Daniel Arthur, PE; Gerry Baker; G. Lee Moody; and David B. Cornue, PG, CHMM Venue: American Chemical Society (53rd Pentasectional Meeting) – Halliburton Energy Services Technology Center, Duncan, OK, March 8, 2008 (http://www.acs.org [external site]) Abstract: Research funded by the United States Department of Energy’s National Energy Technology Laboratory and conducted under the direction of the Interstate Oil and Gas Compact Commission has examined concerns related to air emissions resulting from domestic onshore oil and gas exploration and production operations. Current air issues such as ambient air quality standards and non-attainment areas, regulatory compliance and regional inconsistencies, as well as global climate change and carbon sequestration are a few of the subjects perceived to represent potential barriers to energy development. The topic of air quality and how it relates to onshore oil and gas exploration and production activities is examined from the position of environmental sustainability. These concerns can be addressed through reasonable and prudent practices that industry may implement in order to avoid, minimize, or mitigate air emissions. Additionally, air emissions parameters that are not currently regulated (e.g.: CH4 and CO2) may become the subject of increased concern in the future and, therefore, add to the list of issues facing oil and gas exploration and production. Suggestions for further research opportunities with the potential to benefit responsible energy resource development are also presented.

392

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy.govsavingscanada-oil-and-gas-operations-act-canada Rebate Canadian River Compact (Texas) The Canadian River Commission administers the Canadian River Compact which...

393

Compact magnetic energy storage module  

DOE Patents (OSTI)

A superconducting compact magnetic energy storage module in which a plurality of superconducting toroids, each having a toroidally wound superconducting winding inside a poloidally wound superconducting winding, are stacked so that the flow of electricity in each toroidally wound superconducting winding is in a direction opposite from the direction of electrical flow in other contiguous superconducting toroids. This allows for minimal magnetic pollution outside of the module. 4 figures.

Prueitt, M.L.

1994-12-20T23:59:59.000Z

394

Compact magnetic energy storage module  

DOE Patents (OSTI)

A superconducting compact magnetic energy storage module in which a plurality of superconducting toroids, each having a toroidally wound superconducting winding inside a poloidally wound superconducting winding, are stacked so that the flow of electricity in each toroidally wound superconducting winding is in a direction opposite from the direction of electrical flow in other contiguous superconducting toroids. This allows for minimal magnetic pollution outside of the module.

Prueitt, Melvin L. (Los Alamos, NM)

1994-01-01T23:59:59.000Z

395

Compact portable diffraction moire interferometer  

DOE Patents (OSTI)

A compact and portable moire interferometer used to determine surface deformations of an object. The improved interferometer is comprised of a laser beam, optical and fiber optics devices coupling the beam to one or more evanescent wave splitters, and collimating lenses directing the split beam at one or more specimen gratings. Observation means including film and video cameras may be used to view and record the resultant fringe patterns.

Deason, Vance A. (Shelley, ID); Ward, Michael B. (Idaho Falls, ID)

1989-01-01T23:59:59.000Z

396

Compact portable diffraction moire interferometer  

DOE Patents (OSTI)

A compact and portable moire interferometer used to determine surface deformations of an object. The improved interferometer is comprised of a laser beam, optical and fiber optics devices coupling the beam to one or more evanescent wave splitters, and collimating lenses directing the split beam at one or more specimen gratings. Observations means including film and video cameras may be used to view and record the resultant fringe patterns. 7 figs.

Deason, V.A.; Ward, M.B.

1988-05-23T23:59:59.000Z

397

Thixoforming of Stellite Powder Compacts  

SciTech Connect

Thixoforming involves processing metallic alloys in the semi-solid state. The process requires the microstructure to be spheroidal when part-solid and part-liquid i.e. to consist of solid spheroids surrounded by liquid. The aim of this work was to investigate whether powder compacts can be used as feedstock for thixoforming and whether the consolidating pressure in the thixoformer can be used to remove porosity from the compact. The powder compacts were made from stellite 6 and stellite 21 alloys, cobalt-based alloys widely used for e.g. manufacturing prostheses. Isothermal heat treatments of small samples in the consolidated state showed the optimum thixoforming temperature to be in the range 1340 deg. C-1350 deg. C for both materials. The alloys were thixoformed into graphite dies and flowed easily to fill the die. Porosity in the thixoformed components was lower than in the starting material. Hardness values at various positions along the radius of the thixoformed demonstrator component were above the specification for both alloys.

Hogg, S. C. [Institute of PolymerTechnology and Materials Engineering, Loughborough University, Loughborough, LE11 3TU (United Kingdom); Atkinson, H. V. [Department of Engineering, University of Leicester, University Rd., Leicester LE1 7RH (United Kingdom); Kapranos, P. [Department of Engineering Materials, University of Sheffield, Mappin Street, Sheffield S1 3JD (United Kingdom)

2007-04-07T23:59:59.000Z

398

Nuclear Regulatory Commission issuances, August 1987  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1987-08-01T23:59:59.000Z

399

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report January 2009 #12;2 California Solar Initiative CPUC Staff Progress Report - January 2009 The California Public progress on the California Solar Initiative, the country's largest solar incentive program. In January 2007

400

Methodologies for Determining Persistence of Commissioning Benefits  

E-Print Network (OSTI)

Studies on the persistence of commissioning benefits to date have used a variety of methods to evaluate this persistence. This paper proposes a consistent framework for describing and evaluating the persistence of commissioning benefits. It begins by splitting commissioning benefits into two broad categories: 1) benefits that inherently persist; and 2) benefits that may not persist. The study of persistence then considers only the benefits that may not persist. These benefits are critical, since the top five reasons cited for performing commissioning in both new buildings and existing buildings are benefits that may not persist. These benefits are then further divided into benefits that may be quantified and benefits that are generally difficult to quantify. This paper proposes that benefits that may be quantified should generally be evaluated for persistence using approaches that are already widely accepted and used for other purposes, with adaptations where needed. Specifically, it proposes that energy and water savings be evaluated using methods consistent with the International Performance Measurement and Verification Protocol (adapted with additional weather normalization), that comfort and indoor air quality improvements be evaluated using relevant standards, specifically ASHRAE Standard 55 and ASHRAE Standard 62, but goes further and proposes a methodology for economic quantification of these benefits as well. Finally, it is proposed that the persistence of measures whose benefit is difficult to quantify be evaluated simply by determining whether the measure is still in place or performing.

Claridge, D. E.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Our Purpose and Direction Forestry Commission Wales  

E-Print Network (OSTI)

Corporate Our Purpose and Direction Forestry Commission Wales: Corporate Plan 2012 to 2015 #12;Ministers Foreword I am very pleased to be providing the foreword for `Our purpose and direction beyond the 50-year lifespan of Woodlands for Wales. Our Purpose and Direction John Griffiths AM Minister

402

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the total energy they use, and California has a long history of leading the push to improve the energyCalifornia Energy Commission DRAFT STAFF REPORT ACHIEVING ENERGY SAVINGS IN CALIFORNIA BUILDINGS Saving Energy in Existing Buildings and Achieving a ZeroNetEnergy Future JULY 2011 CEC4002011007SD

403

Commissioning of the ATLAS Liquid Argon Calorimeters  

Science Conference Proceedings (OSTI)

A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies is presented. It includes a coherent noise study, a measurement of the quality of the ionization pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

Cooke, Mark S. [Columbia University, New York, NY 10027 (United States)

2009-12-17T23:59:59.000Z

404

Distributed Energy System Validation, Commissioning and  

E-Print Network (OSTI)

Distributed Energy System Validation, Commissioning and Qualification Test Report Prepared Agreement No. DE-FC26-06NT42847 Hawai`i Distributed Energy Resource Technologies for Energy Security Subtask for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative

405

The California Energy Commission and Its Programs  

E-Print Network (OSTI)

supply of competitively priced energy. The state is a world leader in energy research and development energy supply/demand and keeping historical energy data. · Licensing and monitoring the constructionThe California Energy Commission and Its Programs A Public Information Guide Prepared by the Public

406

California Energy Commission GUIDANCE ON WASTE  

E-Print Network (OSTI)

California Energy Commission GUIDANCE GUIDANCE ON WASTE MANAGEMENT PLANS FOR ENERGY EFFICIENCY passed upon the accuracy or adequacy of the information in this report. #12;GUIDANCE ON WASTE MANAGEMENT) obtain waste management plans for each proposed project receiving funding under the Energy Efficiency

407

Potential Benefits of Commissioning California Homes  

SciTech Connect

Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

2002-01-01T23:59:59.000Z

408

Potential Benefits of Commissioning California Homes  

SciTech Connect

Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

2002-01-01T23:59:59.000Z

409

Category:Oil and Gas | Open Energy Information  

Open Energy Info (EERE)

Gas Gas Jump to: navigation, search This category includes companies and information related to oil (petroleum) or natural gas. Pages in category "Oil and Gas" The following 114 pages are in this category, out of 114 total. A Abu Dhabi National Oil Company Abu Dhabi Supreme Petroleum Council Al Furat Petroleum Company Alabama Oil and Gas Board Alaska Division of Oil and Gas Alaska Oil and Gas Conservation Commission Algeria Ministry of Energy and Mining Archaeological Resource Protection Act Archaeological Resources Protection Act Arizona Oil and Gas Commission Arkansas Oil and Gas Commission B Bahrain National Gas and Oil Authority Bald and Golden Eagle Protection Act C California Division of Oil, Gas, and Geothermal Resources California Environmental Quality Act

410

The LHCb Muon detector commissioning and first running scenarios  

E-Print Network (OSTI)

The LHCb muon detector, part of the first LHCb trigger level (L0), has been built to provide a fast and efficient identification of the muons produced in pp collisions at the LHC. The expected performances are: 95% L0 trigger efficiency within a 25 ns time window and muon identification in L0 with a Pr resolution of 20%. The detector has been built using Multi-Wire Proportional Chambers and Gas Electron Multiplier technology. The chambers are arranged in five stations, interspersed with iron filter placed along the beam pipe. The results obtained in the commissioning of all the installed chambers and the measured performances are presented. The strategies foreseen for the detector calibration, the results of the space and time alignment efforts and few first running scenarios are discussed.

Furcas, S

2010-01-01T23:59:59.000Z

411

IOGCC/DOE oil and gas environmental workshop  

SciTech Connect

The Interstate Oil and Gas Compact Commission (IOGCC) in cooperation with US Department of Energy (DOE) has developed a workshop format to allow state regulatory officials and industry representatives the opportunity to participate in frank and open discussions on issues of environmental regulatory compliance. The purpose of providing this forum is to assist both groups in identifying the key barriers to the economic recoverability of domestic oil and gas resources while adequately protecting human health and the environment. The IOGCC and DOE staff worked with key state and industry representatives to develop a list of appropriate regulatory and industry representatives to be invited to participate. These same industry and regulatory representatives also provided a prioritized list of topics to be discussed at this workshop. After the topic leader set out the issue, views of those present were solicited. In almost every case, both the industry representatives and the regulatory personnel spoke with candor in discussing the problems. Common points of discussion for each topic were: (1) conflicting state and federal regulations; (2) conflicting regulations or permit requirements established by different state agencies; (3) increasing compliance costs; and (4) regulatory constraints that will result in ``no net growth`` in California oil and gas production and more likely a net decrease. This report contains a copy of the written presentation for each topic as well as a summary of the participants discussion.

Not Available

1991-12-31T23:59:59.000Z

412

Project 242  

NLE Websites -- All DOE Office Websites (Extended Search)

Association Interstate Oil and Gas Compact Commission (IOGCC) Kentucky Geological Survey, University of Kentucky Kentucky Oil & Gas Association Louisville Gas and Electric Energy...

413

Residual Stress Tensor in a Compact Tension Weld Specimen  

Science Conference Proceedings (OSTI)

Presentation Title, Residual Stress Tensor in a Compact Tension Weld Specimen ... austenitic stainless steel (Esshete 1250) compact tension weld specimen.

414

On the calibration and commissioning of lighting controls  

SciTech Connect

Lighting controls have the potential to capture significant energy savings in commercial buildings if properly specified, installed, commissioned and maintained. Proper commissioning is often absent in lighting projects and the lack of commissioning can significantly reduce a project`s energy savings potential. The paper focuses on the importance of good commissioning practice for obtaining satisfactory performance from lighting control systems and discusses the difficulties of commissioning today`s systems. Some practical suggestions for commissioning lighting controls is offered as well as advice to specifiers and early adopters to aid them in selecting controls that are most appropriate to their requirements.

Rubinstein, F.; Avery, D.; Jennings, J. [Lawrence Berkeley National Lab., CA (United States). Environmental Energy Technologies Div.; Blanc, S. [Pacific Gas and Electric Co., San Ramon, CA (United States). Customer Energy Management Dept.

1997-10-01T23:59:59.000Z

415

Requirements for Commissioning HVAC Systems Using BEMS and Commissioning the BEMS Itself Based on Questionnaire Surveys  

E-Print Network (OSTI)

In this paper the present status and requirements for commissioning of HVAC Systems using Building Energy Management Systems (BEMS) and commissioning the BEMS itself are investigated and summarized. The information presented is based on the results of the questionnaire and interview survey of experts which was carried out in four countries; Japan, the USA, France and Canada. This paper intends to clarify the requirements and future scope of the above issues by analyzing similarities and differences between the countries.

Yoshida, H.; Vaezi-Nejad, H.; Choiniere, D.; Wang, F.

2004-01-01T23:59:59.000Z

416

RESEARCH ROADMAP FOR GREENHOUSE GAS INVENTORY  

E-Print Network (OSTI)

RESEARCH ROADMAP FOR GREENHOUSE GAS INVENTORY METHODS Prepared For: California Energy Commission Consulting · Riitta Pipatti, IPCC Task Force on National Greenhouse Gas Inventories · Dennis Rolston Agency · Fabian Wagner, IPCC Task Force on National Greenhouse Gas Inventories · Wilfried Winiwarter

417

Natural gas monthly, October 1991  

SciTech Connect

The Natural Gas Monthly (NGM) is prepared in the Data Operations Branch of the Reserves and Natural Gas Division, Office of Oil and Gas, Energy Information Administration (EIA), US Department of Energy (DOE). The NGM highlights activities, events, and analyses of interest to public and private sector organizations associated with the natural gas industry. Volume and price data are presented each month for natural gas production, distribution, consumption, and interstate pipeline activities. Producer-related activities and underground storage data are also reported. The data in this publication are collected on surveys conducted by the EIA to fulfill its responsibilities for gathering and reporting energy data. Some of the data are collected under the authority of the Federal Energy Regulatory Commission (FERC), an independent commission within the DOE, which has jurisdiction primarily in the regulation of electric utilities and the interstate natural gas industry. Geographic coverage is the 50 States and the District of Columbia. 16 figs., 33 tabs.

Not Available

1991-11-05T23:59:59.000Z

418

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

, presentations, and proposed study design, including Pacific Gas and Electric Company, Sempra Energy Utilities, production, processing, pipelines, liquefied natural gas, LNG, regasification, maximum allowed operating ......................................................................................................................... 56 LNG Exports From the United States

419

California Energy Commission STAFF FINAL REPORT  

E-Print Network (OSTI)

, presentations, and proposed study design, including Pacific Gas and Electric Company, Sempra Energy Utilities, border price, citygate, price, production, processing, pipelines, liquefied natural gas, LNG ................................................................................................................ 145 List of Acronyms

420

Automated Continuous Commissioning of Commercial Buildings  

E-Print Network (OSTI)

for building electric and gas usage Overall building energyGas Emissions (CO2) Building total steam consumption (therm/(ft 2 -yr)) and peak demand Metering data for building electric and steam usage

Bailey, Trevor

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

California Energy Commission STAFF FINAL REPORT  

E-Print Network (OSTI)

........................................................................................................ 18 Calculation of Biomass, Biogas or Landfill Net Emissions ..................................... 19 reductions associated with biomass, biogas, and landfill gas are considered in the determination of a net, biogas, and landfill gas used to generation electricity. The final CPUC staff workshop report

422

California Coastal Commission | Open Energy Information  

Open Energy Info (EERE)

Logo: California Coastal Commission Name California Coastal Commission Address 45 Fremont Street, Suite 2000 Place San Francisco, California Zip 94105-2219 Phone number 415-904-5400 Website http://www.coastal.ca.gov/ Coordinates 37.7912419°, -122.397133° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7912419,"lon":-122.397133,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

423

Automatic Commissioning of Multiple VAV Terminals  

E-Print Network (OSTI)

A site survey on a modern operating commercial building screened 261 ineffective VAV (Variable Air Volume) boxes (20.9% of the total boxes in the building) and summarized ten typical faults for VAV air-conditioning system(s) resulting in energy waste, performance degradation or totally out of control. A strategy is developed to automatically check the health condition of VAV terminals and diagnose the faults. Hybrid approach is employed to establish a commissioning and re-commissioning tool of VAV air-conditioning system. Performance indices with expert rules based on system physical characteristics are adopted to detect and diagnose the nine of the ten faults. PCA (Principal Component Analysis) method is developed to detect and diagnose the VAV box flow sensor bias (Fault 10) and to reconstruct the faulty sensors. A multiple VAV fault FDD strategy for a VAV entire system is developed, which is validated in simulation and filed tests.

Qin, J.; Wang, S.

2004-01-01T23:59:59.000Z

424

Blue Ribbon Commission on America's Nuclear Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Nuclear Future Blue Ribbon Commission on America's Nuclear Future Agenda March 25 - 26, 2010 Willard Intercontinental Hotel, Washington, DC Thursday, March 25, 2010 Open Meeting - Grand Ballroom 11:00 a.m. Open meeting/review agenda Tim Frazier 11:10 a.m. Opening comments from Secretary Chu 11:25 a.m. Opening discussion - Co-chairs Honorable Lee Hamilton General Brent Scowcroft 11:35 a.m. Opening discussion - members Honorable Pete Domenici Honorable Chuck Hagel Honorable Phil Sharp Mr. Mark H. Ayers Honorable Vicky Bailey Dr. Albert Carnesale Ms. Susan Eisenhower Mr. Jonathan Lash Dr. Allison Macfarlane Dr. Richard A. Meserve Dr. Ernie Moniz Mr. John Rowe Dr. Per F. Peterson 12:30 p.m. Lunch

425

Colorado Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 1560 Broadway, Suite 250 Place Denver, Colorado Zip 80202 Phone number (303) 894-2000 Coordinates 39.7415017°, -104.9866578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7415017,"lon":-104.9866578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

426

California Energy Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Commission Energy Commission Address 1516 Ninth Street, MS-29 Place Sacramento, CA Zip 95814-5512 Website http://www.energy.ca.gov Coordinates 40.97989806962°, -94.21875° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.97989806962,"lon":-94.21875,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

427

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555  

Office of Legacy Management (LM)

REGULATORY COMMISSION REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 2 2 1982 -/ Departmznt'of Ene,rgy ATTN : Dr. William E. Mott, Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. Mott: Enclosed is the list of contaminated'or potentially contaminated sites that I promised to send you during our recent meeting. The sites have been broken down into the followi,ng four categories: 1. Sites with known contamination that have never been 1 icensed. 2. Formerly licensed sites with known contamination. 3. Currently licensed sites that are being decontaminated prior to decoronissioning. 4. A list of formerly licensed sites that need to be visited to determine if they have been properly decontaminated prior to decommissioning.

428

Railroad Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Logo: Railroad Commission of Texas Name Railroad Commission of Texas Address 1701 N. Congress Place Austin, Texas Zip 78701 Year founded 1891 Phone number (512) 463-7158 Website http://www.rrc.state.tx.us/ Coordinates 30.2790636°, -97.7382267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2790636,"lon":-97.7382267,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

429

Oregon Environmental Quality Commission | Open Energy Information  

Open Energy Info (EERE)

Oregon Environmental Quality Commission Oregon Environmental Quality Commission Address 811 SW 6th Avenue Place Portland, Oregon Zip 97204-1390 Phone number 503-229-5301 Website http://www.oregon.gov/DEQ/EQC/ Coordinates 45.5182053°, -122.6790735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.5182053,"lon":-122.6790735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

430

A History of the Atomic Energy Commission  

SciTech Connect

This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

Buck, A.L.

1983-07-01T23:59:59.000Z

431

Nuclear Regulatory Commission Information Digest, 1991 edition  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

Olive, K L

1991-03-01T23:59:59.000Z

432

RESEARCH AND DEVELOPMENT OF AN INTEGRAL SEPARATOR FOR A CENTRIFUGAL GAS PROCESSING FACILITY  

Science Conference Proceedings (OSTI)

A COMPACT GAS PROCESSING DEVICE WAS INVESTIGATED TO INCREASE GAS PRODUCTION FROM REMOTE, PREVIOUSLY UN-ECONOMIC RESOURCES. THE UNIT WAS TESTED ON AIR AND WATER AND WITH NATURAL GAS AND LIQUID. RESULTS ARE REPORTED WITH RECOMMENDATIONS FOR FUTURE WORK.

LANCE HAYS

2007-02-27T23:59:59.000Z

433

International Electrotechnical Commission IEC 61850 Substation Development  

Science Conference Proceedings (OSTI)

The International Electrotechnical Commission Standard IEC 61580 is an emerging standard for advanced utility automation that provides a rich, hierarchical data and behavior model for use in sophisticated substation control and protection equipment. One of the important features introduced by IEC 61850 is the replacement of the wires used to exchange binary and analog information between Intelligent Electronic Devices (IEDs) with communication messages. In a conventional substation, the substation engine...

2009-03-25T23:59:59.000Z

434

Commissioning and Calibration of the ALICE TPC  

E-Print Network (OSTI)

ALICE (A Large Ion Collider Experiment) is the dedicated heavy ion experiment at the Large Hadron Collider at CERN. The main tracking device of ALICE is a large volume TPC. The milestones of the TPC commissioning as well as the current status of the detector calibration are presented. The obtained resolutions in transverse momentum, position as well as in specific energy loss (dE/dx) are presented and results from noise and electron drift velocity measurements are addressed.

J. Wiechula; for the ALICE TPC Collaboration

2009-07-24T23:59:59.000Z

435

Indexes to Nuclear Regulatory Commission Issuances  

SciTech Connect

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

NONE

1996-12-31T23:59:59.000Z

436

Delmarva - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Retro-Commissioning: $30,000 Commissioning: 50% of cost Enhanced Commissioning: 20,000 All Incentives: 250,000/account/year and 500,000/customer for custom, prescriptive, commissioning and OandM Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $0.02/sq ft or $4,000 (Development); $0.06/sq ft or

437

Ex Parte Meeting between DOE and California Energy Commission...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57 Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57...

438

Ohio River Valley Water Sanitation Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Ohio River Valley Water Sanitation Commission (ORSANCO), was established on June 30, 1948 to control and abate pollution in the Ohio River Basin. ORSANCO is an interstate commission...

439

Roanoke River Basin Bi-State Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Roanoke River Basin Bi-State Commission was established as a bi-state commission composed of members from the Commonwealth of Virginia and the State of North Carolina.The purpose of the...

440

Ex parte communication of the California Energy Commission- Docket...  

NLE Websites -- All DOE Office Websites (Extended Search)

communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 On...

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Report of the State of Nevada Commission on Nuclear Projects  

SciTech Connect

This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission`s functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts.

1990-12-01T23:59:59.000Z

442

Compacted carbon for electrochemical cells  

DOE Patents (OSTI)

This invention provides compacted carbon that is useful in the electrode of an alkali metal/carbon electrochemical cell of improved capacity selected from the group consisting of: (a) coke having the following properties: (i) an x-ray density of at least 2.00 grams per cubic centimeters, (ii) a closed porosity of no greater than 5%, and (iii) an open porosity of no greater than 47%; and (b) graphite having the following properties: (i) an x-ray density of at least 2.20 grams per cubic centimeters, (ii) a closed porosity of no greater than 5%, and (iii) an open porosity of no greater than 25%. This invention also relates to an electrode for an alkali metal/carbon electrochemical cell comprising compacted carbon as described above and a binder. This invention further provides an alkali metal/carbon electrochemical cell comprising: (a) an electrode as described above, (b) a non-aqueous electrolytic solution comprising an organic aprotic solvent and an electrolytically conductive salt and an alkali metal, and (c) a counterelectrode.

Greinke, Ronald Alfred (Medina, OH); Lewis, Irwin Charles (Strongsville, OH)

1997-01-01T23:59:59.000Z

443

Compacted carbon for electrochemical cells  

DOE Patents (OSTI)

This invention provides compacted carbon that is useful in the electrode of an alkali metal/carbon electrochemical cell of improved capacity selected from the group consisting of: (a) coke having the following properties: (1) an x-ray density of at least 2.00 grams per cubic centimeters, (2) a closed porosity of no greater than 5%, and (3) an open porosity of no greater than 47%; and (b) graphite having the following properties: (1) an x-ray density of at least 2.20 grams per cubic centimeters, (2) a closed porosity of no greater than 5%, and (3) an open porosity of no greater than 25%. This invention also relates to an electrode for an alkali metal/carbon electrochemical cell comprising compacted carbon as described above and a binder. This invention further provides an alkali metal/carbon electrochemical cell comprising: (a) an electrode as described above, (b) a non-aqueous electrolytic solution comprising an organic aprotic solvent and an electrolytically conductive salt and an alkali metal, and (c) a counter electrode. 10 figs.

Greinke, R.A.; Lewis, I.C.

1997-10-14T23:59:59.000Z

444

Design, Commissioning and Operational Aspects of a Novel Oxalate ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Design, Commissioning and...

445

Preliminary State-of-the-Art Review for Commissioning Low ...  

Science Conference Proceedings (OSTI)

... a literature review of commissioning and operational experience with existing buildings that were designed to have low energy consumption. ...

2008-02-14T23:59:59.000Z

446

Federal Energy Regulatory Commission fiscal year 1997 annual financial statements  

Science Conference Proceedings (OSTI)

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

NONE

1998-02-24T23:59:59.000Z

447

Practical Diagnostics for Evaluating Residential Commissioning Metrics  

SciTech Connect

In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

2002-06-11T23:59:59.000Z

448

Method for preparing porous metal hydride compacts  

DOE Patents (OSTI)

A method for preparing porous metallic-matrix hydride compacts which can be repeatedly hydrided and dehydrided without disintegration. A mixture of a finely divided metal hydride and a finely divided matrix metal is contacted with a poison which prevents the metal hydride from dehydriding at room temperature and atmospheric pressure. The mixture of matrix metal and poisoned metal hydride is then compacted under pressure at room temperature to form porous metallic-matrix hydride compacts.

Ron, M.; Gruen, D.M.; Mendelsohn, M.H.; Sheft, I.

1980-01-21T23:59:59.000Z

449

U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

Applications International Applications (SAIC) technical and quality program files associated with the development of the draft NUREG. The CNWRA also reviewed the SAIC spreadsheet calculations for analyses used in the draft NUREG. These calculations were transmitted by the NRC to the CNWRA on compact disks The enclosed report includes changes to our previous document (Deliverable 08801.081.001) in response to Reference I and subsequent interactions between the CNWRA and NRC staffs. /7-Washington Office Twinbrook Metro Plaza #210

Account No; Sincf S; L. Camper; C. Haney; Cnwra Directors; R. Benke; R. Nelson; R. Hog

2001-01-01T23:59:59.000Z

450

Compact Solid State Cooling Systems: Compact MEMS Electrocaloric Module  

SciTech Connect

BEETIT Project: UCLA is developing a novel solid-state cooling technology to translate a recent scientific discovery of the so-called giant electrocaloric effect into commercially viable compact cooling systems. Traditional air conditioners use noisy, vapor compression systems that include a polluting liquid refrigerant to circulate within the air conditioner, absorb heat, and pump the heat out into the environment. Electrocaloric materials achieve the same result by heating up when placed within an electric field and cooling down when removedeffectively pumping heat out from a cooler to warmer environment. This electrocaloric-based solid state cooling system is quiet and does not use liquid refrigerants. The innovation includes developing nano-structured materials and reliable interfaces for heat exchange. With these innovations and advances in micro/nano-scale manufacturing technologies pioneered by semiconductor companies, UCLA is aiming to extend the performance/reliability of the cooling module.

None

2010-10-01T23:59:59.000Z

451

THE NATIONAL COMMISSION ON ENERGY POLICY December 2004  

E-Print Network (OSTI)

THE NATIONAL COMMISSION ON ENERGY POLICY December 2004 ENDING THE ENERGY STALEMATE A Bipartisan THE NATIONAL COMMISSION ON ENERGY POLICY December 2004 www.energycommission.org #12;PREAMBLE This report. ACKNOWLEDGEMENTS The National Commission on Energy Policy was founded in 2002 by the William and Flora Hewlett

Laughlin, Robert B.

452

California Energy Commission Technical Assistance for the Alternative and  

E-Print Network (OSTI)

California Energy Commission 1 Technical Assistance for the Alternative and Renewable Fuel and Vehicle Technology (ARFVT) Program California Energy Commission Request for Proposals RFP # 600-12-604 Pre-Bid Conference Date: January 23, 2013 #12;California Energy Commission AGENDA 10:00 Welcome and Introductions

453

European Commission Air pollution research report No 81  

E-Print Network (OSTI)

the European Commission nor any person acting on behalf of the Commission is responsible for the use which to the authors, the reviewers, the editorial board and the editor for their hard work in preparing this report. I General European Commission #12;#12;CONTENTS Pages PREFACE 3 CONTENTS 5 EDITORS, AUTHORS AND REVIEWERS 9

454

Dedicated Compact Refinery - Programmaster.org  

Science Conference Proceedings (OSTI)

Meeting, 2013 TMS Annual Meeting & Exhibition ... capital cost per tonne of alumina (tA) capacity; * Compact plant production capacity, resulting in a simple and...

455

Compact Absorption Chiller - Energy Innovation Portal  

The Compact Absorption Chiller uses microchannel technologies in an absorption heat pump which produces cooling using heat as the primary energy source.

456

Redesign and shock analysis of HALIFAX class frigate gas turbine uptake structure.  

E-Print Network (OSTI)

??The gas turbine exhaust uptakes in the HALIFAX class frigates of the Canadian Navy have experienced thermally-induced fatigue cracking since soon after the commissioning of (more)

Summers, Simon A. (Simon Andrew)

2008-01-01T23:59:59.000Z

457

Table 6.6 Natural Gas Underground Storage, End of Year 1954-2011 ...  

U.S. Energy Information Administration (EIA)

Short-Term Energy Outlook Annual Energy Outlook ... Commission, Form FPC-8, "Underground Gas Storage Report." - 1979-1984-U.S. Energy Information

458

Growth of compaction bands: A new deformation mode for porous rock  

SciTech Connect

Compaction bands are thin, tabular zones of grain breakage and reduced porosity that are found in sandstones. These structures may form due to tectonic stresses or as a result of local stresses induced during production of fluids from wells, resulting in barriers to fluid (oil, gas, water) movement in sandstone reservoirs. To gain insight into the formation of compaction bands the authors have produced them in the laboratory. Acoustic emission locations were used to define and track the thickness of compaction bands throughout the stress history during axisymmetric compression experiments. Narrow zones of intense acoustic emission, demarcating the boundaries between the uncompacted and compacted regions were found to develop. Unexpectedly, these boundaries moved at velocities related to the fractional porosity reduction across the boundary and to the imposed specimen compression stress. This appears to be a previously unrecognized, fundamental mode of deformation of a porous, granular material subjected to compressive loading with significant implications for the production of hydrocarbons.

OLSSON,WILLIAM A.; HOLCOMB,DAVID J.

2000-03-14T23:59:59.000Z

459

Commissioning of the SNS front-end systems at Berkeley Lab  

E-Print Network (OSTI)

COMMISSIONING OF THE SNS FRONT-END SYSTEMS AT BERKELEY LAB*Details of other MEBT commissioning efforts, especiallywere provided by LANL. Commissioning topics included beam

2002-01-01T23:59:59.000Z

460

Advanced Design and Commissioning Tools for Energy-Efficient Building Technologies  

E-Print Network (OSTI)

pp. 728733. Chapter 2: Commissioning guidelines for UFAD2.0 To accomplish commissioning of UFAD system, specificprocedure for use by commissioning agents and other building

Bauman, Fred; Webster, Tom; Zhang, Hui; Arens, Ed

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Design and Commissioning Plan for a Laser Heater for FERMI@elettra  

E-Print Network (OSTI)

F TN-08/13 Design and Commissioning Plan for a Laser Heateroperational guidelines for commissioning. Disclaimer Thisto be important for commissioning and for emittance

Zholents, Alexander A.

2008-01-01T23:59:59.000Z

462

Salsbury and Diamond: Automated Testing of HVAC Systems for Commissioning -1 -Automated Testing of HVAC Systems for Commissioning  

E-Print Network (OSTI)

and Diamond: Automated Testing of HVAC Systems for Commissioning - 1 - Automated Testing of HVAC Systems This paper describes an approach to the automation of the commissioning of HVAC systems. The approach of many HVAC systems is limited more by poor installation, commissioning, and maintenance than by poor

463

Compact submanifolds supporting singular interactions  

E-Print Network (OSTI)

A quantum particle moving under the influence of singular interactions on embedded surfaces furnish an interesting example from the spectral point of view. In these problems, the possible occurrence of a bound state is perhaps the most important aspect. Such systems can be introduced as quadratic forms and generically they do not require renormalization. Yet an alternative path through the resolvent is also beneficial to study various properties. In the present work, we address these issues for compact surfaces embedded in a class of ambient manifolds. We discover that there is an exact bound state solution written in terms of the heat kernel of the ambient manifold for a range of coupling strengths. Moreover, we develop techniques to estimate bounds on the ground state energy when several surfaces, each of which admits a bound state solution, coexist.

Kaynak, Burak Tevfik

2013-01-01T23:59:59.000Z

464

Compact submanifolds supporting singular interactions  

E-Print Network (OSTI)

A quantum particle moving under the influence of singular interactions on embedded surfaces furnish an interesting example from the spectral point of view. In these problems, the possible occurrence of a bound state is perhaps the most important aspect. Such systems can be introduced as quadratic forms and generically they do not require renormalization. Yet an alternative path through the resolvent is also beneficial to study various properties. In the present work, we address these issues for compact surfaces embedded in a class of ambient manifolds. We discover that there is an exact bound state solution written in terms of the heat kernel of the ambient manifold for a range of coupling strengths. Moreover, we develop techniques to estimate bounds on the ground state energy when several surfaces, each of which admits a bound state solution, coexist.

Burak Tevfik Kaynak; O. Teoman Turgut

2013-05-24T23:59:59.000Z

465

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

466

Public Service Commission Authorization to Utilize an Alternative Method of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Service Commission Authorization to Utilize an Alternative Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Mississippi Program Type Green Power Purchasing Industry Recruitment/Support Performance-Based Incentive Public Benefits Fund Provider Public Service Commission The Senate Bill 2793 authorizes the Public Service Commission (PSC) to

467

Interstate Commission on the Potomac River Basin (Multiple States) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

468

RF-Plasma Source Commissioning in Indian Negative Ion Facility  

Science Conference Proceedings (OSTI)

The Indian program of the RF based negative ion source has started off with the commissioning of ROBIN, the inductively coupled RF based negative ion source facility under establishment at Institute for Plasma research (IPR), India. The facility is being developed under a technology transfer agreement with IPP Garching. It consists of a single RF driver based beam source (BATMAN replica) coupled to a 100 kW, 1 MHz RF generator with a self excited oscillator, through a matching network, for plasma production and ion extraction and acceleration. The delivery of the RF generator and the RF plasma source without the accelerator, has enabled initiation of plasma production experiments. The recent experimental campaign has established the matching circuit parameters that result in plasma production with density in the range of 0.5-1x10{sup 18}/m{sup 3}, at operational gas pressures ranging between 0.4-1 Pa. Various configurations of the matching network have been experimented upon to obtain a stable operation of the set up for RF powers ranging between 25-85 kW and pulse lengths ranging between 4-20 s. It has been observed that the range of the parameters of the matching circuit, over which the frequency of the power supply is stable, is narrow and further experiments with increased number of turns in the coil are in the pipeline to see if the range can be widened. In this paper, the description of the experimental system and the commissioning data related to the optimisation of the various parameters of the matching network, to obtain stable plasma of required density, are presented and discussed.

Singh, M. J.; Bandyopadhyay, M.; Yadava, Ratnakar; Chakraborty, A. K. [ITER- India, Institute for Plasma Research, A-29, Sector 25, GIDC, Gandhinagar, Gujrat (India); Bansal, G.; Gahlaut, A.; Soni, J.; Kumar, Sunil; Pandya, K.; Parmar, K. G.; Sonara, J. [Institute for Plasma Research, Bhat Gandhinagar, Gujrat (India); Kraus, W.; Heinemann, B.; Riedl, R.; Obermayer, S.; Martens, C.; Franzen, P.; Fantz, U. [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstrasse 2, D-85748 Garching (Germany)

2011-09-26T23:59:59.000Z

469

EIA - Natural Gas Pipeline Network - Intrastate Natural Gas Pipeline  

U.S. Energy Information Administration (EIA) Indexed Site

Intrastate Natural Gas Pipeline Segment Intrastate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Intrastate Natural Gas Pipeline Segment Overview Intrastate natural gas pipelines operate within State borders and link natural gas producers to local markets and to the interstate pipeline network. Approximately 29 percent of the total miles of natural gas pipeline in the U.S. are intrastate pipelines. Although an intrastate pipeline system is defined as one that operates totally within a State, an intrastate pipeline company may have operations in more than one State. As long as these operations are separate, that is, they do not physically interconnect, they are considered intrastate, and are not jurisdictional to the Federal Energy Regulatory Commission (FERC). More than 90 intrastate natural gas pipelines operate in the lower-48 States.

470

Underground Storage of Natural Gas and Liquefied Petroleum Gas (Nebraska) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Underground Storage of Natural Gas and Liquefied Petroleum Gas Underground Storage of Natural Gas and Liquefied Petroleum Gas (Nebraska) Underground Storage of Natural Gas and Liquefied Petroleum Gas (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Nebraska Program Type Siting and Permitting Provider Nebraska Oil and Gas Conservation Commission This statute declares underground storage of natural gas and liquefied petroleum gas to be in the public interest if it promotes the conservation

471

The ATLAS Trigger System Commissioning and Performance  

E-Print Network (OSTI)

The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

A. Hamilton

2010-09-30T23:59:59.000Z

472

Commissioning of the ATLAS Liquid Argon Calorimeter  

E-Print Network (OSTI)

The in-situ commissioning of the ATLAS liquid argon calorimeter is taking place since three years. During this period, it has been fully tested by means of frequent calibration runs, and the analysis of the large cosmic muon data samples and of the few beam splash events that occurred on September 10th, 2008. This has allowed to obtain a stable set of calibration constants for the first collisions, and to measure the in-situ calorimeter performances that were found to be at the expected level.

S. Laplace

2010-05-17T23:59:59.000Z

473

Commissioning of SLAC SLD 45-Degree Chambers  

E-Print Network (OSTI)

The SLD experiment at the Stanford Linear Accelerator Center had a significant gap in its muon tracking coverage, provided by the Warm Iron Calorimeter. Supplemental planes of limited streamer tube chambers were added to improve the coverage in the vicinity of the gap at 0.65 commissioning of the forty-five degree chamber region of the SLAC SLD Warm Iron Calorimeter is presented. This task involved the completion of the forty-five degree chamber region geometry for the Warm Iron Calorimeter's fitter and swimmer and the changing of the way multiple scattering effects are treated in the fitter algorithm.

V. O. Eschenburg

2002-07-30T23:59:59.000Z

474

Commissioning of the ATLAS Muon Trigger Selection  

E-Print Network (OSTI)

The performance of the three-level ATLAS muon trigger as evaluated by using LHC data is presented. Events have been selected by using only the hardware-based Level-1 trigger in order to commission and to subsequently enable the (software-based) selections of the High Level Trigger. Studies aiming at selecting prompt muons from J/{\\psi} and at reducing non prompt muon contamination have been performed. A brief overview on how the muon triggers evolve with increasing luminosity is given.

Musto, Elisa

2010-01-01T23:59:59.000Z

475

Commissioning of the ATLAS Muon Trigger Selection  

E-Print Network (OSTI)

The performance of the three-level ATLAS muon trigger as evaluated by using LHC data is presented. Events have been selected by using only the hardware-based Level-1 trigger in order to commission and to subsequently enable the (software-based) selections of the High Level Trigger. Studies aiming at selecting prompt muons from J/{\\psi} and at reducing non prompt muon contamination have been performed. A brief overview on how the muon triggers evolve with increasing luminosity is given.

Elisa Musto

2010-09-30T23:59:59.000Z

476

Commissioning of the ATLAS pixel detector  

SciTech Connect

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

ATLAS Collaboration; Golling, Tobias

2008-09-01T23:59:59.000Z

477

Natural gas storage - end user interaction. Task 2. Topical report  

Science Conference Proceedings (OSTI)

New opportunities have been created for underground gas storage as a result of recent regulatory developments in the energy industry. The Federal Energy Regulatory Commission (FERC) Order 636 directly changed the economics of gas storage nationwide. This paper discusses the storage of natural gas, storage facilities, and factors affecting the current, and future situation for natural gas storage.

NONE

1996-01-01T23:59:59.000Z

478

Compactness of the space of causal curves  

E-Print Network (OSTI)

We prove that the space of causal curves between compact subsets of a separable globally hyperbolic poset is itself compact in the Vietoris topology. Although this result implies the usual result in general relativity, its proof does not require the use of geometry or differentiable structure.

Keye Martin

2004-08-19T23:59:59.000Z

479

Compaction within the South Belridge diatomite  

SciTech Connect

Compaction is incorporated into a field-scale finite-difference thermal simulator to allow practical engineering analysis of reservoir compaction caused by fluid withdrawal. Capabilities new to petroleum applications include hysteresis in the form of limited rebound during fluid injection and the concept of relaxation time (i.e., creep).

Chase C.A. Jr.; Dietrich, J.K. (Todd, Dietrich and Chase Inc., Durango, CO (US))

1989-11-01T23:59:59.000Z

480

Design and Development of Integrated Compact Multiphase Separation System (CMSS)  

SciTech Connect

The petroleum industry has relied in the past mainly on conventional vessel-type separators, which are bulky, heavy and expensive, to process wellhead production of oil-water-gas flow. Economic and operational pressures continue to force the petroleum industry to seek less expensive and more efficient separation alternatives in the form of compact separators. The compact dimensions, smaller footprint and lower weight of compact separators have a potential for cost savings to the industry, especially in offshore and subsea applications. Also, compact separators reduce the inventory of hydrocarbons significantly, which is critical for environmental This report presents a brief overview of the activities and tasks accomplished during the Budget Period II (October 09, 2004-April 30, 2006) of the DOE project titled ''Design and Development of Integrated Compact Multiphase Separation System (CMSS{copyright})''. An executive summary is presented initially followed by the tasks of the current budget period. Then, detailed description of the experimental and modeling investigations are presented. Subsequently, the technical and scientific results of the activities of this project period are presented with discussions. The findings of this investigation are summarized in the ''Conclusions'' section In this investigation, the concept of CMSS{copyright} has been developed and is proven through simulation studies and validated by experimental data. As part of the second phase of the project (Budget Period II--10/09/2004-04/30/2006) experimental investigation of the integrated CMSS{copyright} for different configurations has been conducted in order to evaluate the performance of the individual separation components, and determine how they will affect the performance of each other when integrated in the CMSS{copyright}. An intelligent control system is also developed to improve the total system efficiency of Compact Multiphase Separation System (CMSS{copyright}). In mature oil fields, water handling poses a huge problem. Thus water knock out at the earliest stage helps in significant cost savings during handling, separation and transportation of oil. One of the objectives of the CMSS{copyright} configuration is to knock out free water from the upstream fluids. The results from theoretical and experimental studies show that Free Water Knock Out (FWKO) CMSS{copyright} system can be readily deployed in the field using the control system strategies designed, implemented and tested in this study.

Ram S. Mohan; Ovadia Shoham

2006-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "gas compact commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Marcellus Shale Advisory Commission Report Summary  

E-Print Network (OSTI)

for failure to comply. #12;2 Enhance Pennsylvania's Energy Independence. Develop "Green Corridors of designated highways. Include natural gas vehicles in Pennsylvania Clean Vehicles Program. Provide incentives for the conversion of mass transit and school bus fleets to natural gas. Provide incentives

Boyer, Elizabeth W.

482

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Jr., Governor MAY 2012 CEC3002012003CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN

483

Design, construction and commissioning of the Thermal Screen Control System for the CMS Tracker detector at CERN  

E-Print Network (OSTI)

The CERN (European Organization for Nuclear Research) laboratory is currently building the Large Hadron Collider (LHC). Four international collaborations have designed (and are now constructing) detectors able to exploit the physics potential of this collider. Among them is the Compact Muon Solenoid (CMS), a general purpose detector optimized for the search of Higgs boson and for physics beyond the Standard Model of fundamental interactions between elementary particles. This thesis presents, in particular, the design, construction, commissioning and test of the control system for a screen that provides a thermal separation between the Tracker and ECAL (Electromagnetic CALorimeter) detector of CMS (Compact Muon Solenoid experiment). Chapter 1 introduces the new challenges posed by these installations and deals, more in detail, with the Tracker detector of CMS. The size of current experiments for high energy physics is comparable to that of a small industrial plant: therefore, the techniques used for controls a...

Carrone, E; Tsirou, A

484

A new neutral particle analyzer diagnostic and its first commissioning on HL-2A  

Science Conference Proceedings (OSTI)

A new neutral particle analyzer diagnostic has been developed for HuanLiuqi-2A (commonly referred to as HL-2A), which can provide the neutral particle flux measurement along 11 separate sightlines, simultaneously, within a wider energy range (1-70 keV). It is an electrostatic type analyzer with a removable pinhole and special-shape condenser. The energy analysis can be flexibly achieved by controlling a preset stepwise high voltage on the condenser. It is compact and its field of view covers HL-2A cross section from -33 cm to 33 cm without 'cross-talk.' The energy spectra and ion temperature profile have been obtained during its commissioning.

Li, W.; Xia, Z. W.; Lu, J.; Yang, Q. W.; Ding, X. T. [Southwestern Institute of Physics, Chengdu 610041 (China)

2012-10-15T23:59:59.000Z

485

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase  

Open Energy Info (EERE)

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Abstract N/A Author U.S. Geothermal Inc. Published Publisher Not Provided, 2010 Report Number N/A DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Citation U.S. Geothermal Inc.. 2010. Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement. Boise Idaho: (!) . Report No.: N/A. Retrieved from "http://en.openei.org/w/index.php?title=Idaho_Public_Utilities_Commission_Approves_Neal_Hot_Springs_Power_Purchase_Agreement&oldid=682748"

486

EFCOG Best Practice Submission - Guidance for Retro-Commissioning  

Science Conference Proceedings (OSTI)

Commissioning is slowly becoming an accepted quality method for ensuring that buildings are designed, constructed, and operated as required by the building owner and as intended by the original design. Retro-commissioning is a process, using commissioning concepts, to ensure that existing buildings are operated and maintained as required by the owner to meet the buildings current mission. Retro-commissioning further seeks to incorporate new equipment and operating practices to upgrade existing facilities to obtain increased efficiency and employee comfort and productivity. Retro-commissioning practices are not universal. Best practices have been identified to assist Federal organizations with the development of retro-commissioning programs and to help DOE sites to begin this quality related process.

Ernest L. Fossum, CEM

2006-01-01T23:59:59.000Z

487

Notices Safety Commission, 4330 East West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Federal Register 0 Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504-7923. Dated: January 10, 2012. Todd A Stevenson, Secretary. [FR Doc. 2012-625 Filed 1-10-12; 4:15 pm] BILLING CODE 6355-01-P CORPORATION FOR NATIONAL AND COMMUNITY SERVICE Information Collection; Submission for OMB Review, Comment Request AGENCY: Corporation for National and Community Service. ACTION: Notice. SUMMARY: The Corporation for National and Community Service (the Corporation), has submitted a public information collection request (ICR) entitled Day of Service Project Promotion Tool for review and approval in accordance with the Paperwork Reduction Act of 1995, Public Law 104- 13, (44 U.S.C. chapter 35). Copies of this

488

FTC data analysis. [Federal Trade Commission  

SciTech Connect

Manufacturers of 5 major consumer products submitted energy efficiency and related data to the Federal Trade Commission during late 1979 and early 1980 in response to energy-efficiency labeling and representations requirements. This report documents an analysis of these data as conducted by Vitro Laboratories. Data were submitted on five products: furnaces, water heaters, room air conditioners, refrigerators and refrigerator-freezers, and freezers. The submittals include information on manufacturer model number, estimated annual energy cost or the energy-efficiency rating, the number of tests performed on each basic model, and the capacity of each appliance model. Pattern analyses on these variables are presented, but it is observed that few common patterns for the five products exist. The unique patterns for each product are discussed.

Not Available

1981-02-11T23:59:59.000Z

489

EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Development &  

U.S. Energy Information Administration (EIA) Indexed Site

Pipelinesk > Development & Expansion Pipelinesk > Development & Expansion About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Pipeline Development and Expansion Timing | Determining Market Interest | Expansion Options | Obtaining Approval | Prefiling Process | Approval | Construction | Commissioning Timing and Steps for a New Project An interstate natural gas pipeline construction or expansion project takes an average of about three years from the time it is first announced until the new pipe is placed in service. The project can take longer if it encounters major environmental obstacles or public opposition. A pipeline development or expansion project involves several steps: Determining demand/market interest

490

Electric Pulse Method for Compaction of the Mononitride Uranium ...  

Science Conference Proceedings (OSTI)

Presentation Title, Electric Pulse Method for Compaction of the Mononitride ... reactors and also the advantages of the electric pulse compaction method.

491

Compact Cross-Dipole Sonic (CXD) | Open Energy Information  

Open Energy Info (EERE)

2010 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Compact Cross-Dipole Sonic (CXD) Citation Weatherford. Compact Cross-Dipole...

492

NERSC and CRD Help Decipher Science from Compact Accelerator...  

NLE Websites -- All DOE Office Websites (Extended Search)

and CRD Help Decipher Science from Compact Accelerator Simulations NERSC and CRD Help Decipher Science from Compact Accelerator Simulations May 26, 2009 3D Particle Surfing :...

493

Southeast Interstate Low-Level Radioactive Waste Management Compact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southeast Interstate Low-Level Radioactive Waste Management Compact (multi-state) Southeast Interstate Low-Level Radioactive Waste Management Compact (multi-state) Eligibility...

494

Simulation of Powder Compact Forging Process for Producing a ...  

Science Conference Proceedings (OSTI)

Presentation Title, Simulation of Powder Compact Forging Process for Producing a ... Powder compact forging is a recently developed manufacturing process to...

495

Northwest Interstate Compact on Low-Level Radioactive Waste Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northwest Interstate Compact on Low-Level Radioactive Waste Management (Multiple States) Northwest Interstate Compact on Low-Level Radioactive Waste Management (Multiple States)...

496

Atlantic Interstate Low-Level Radioactive Waste Management Compact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atlantic Interstate Low-Level Radioactive Waste Management Compact (South Carolina) Atlantic Interstate Low-Level Radioactive Waste Management Compact (South Carolina) Eligibility...

497

Compact Fluorescent Lamps : Technologies : From the Lab to the...  

NLE Websites -- All DOE Office Websites (Extended Search)

process. (Left) Compact Fluorescent Lamp; (Right) Cover of the 'Lighting Retrofit Workbook' (Left) Compact Fluorescent Lamp (CFL) (Right) Retrofitting national parks...

498

Belle Fourche River Compact (South Dakota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Belle Fourche River Compact (South Dakota) Belle Fourche River Compact (South Dakota) Eligibility Agricultural...

499

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATES OF AMERICA STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project

500

Supersonic gas compressor  

Science Conference Proceedings (OSTI)

A gas compressor based on the use of a driven rotor having a compression ramp traveling at a local supersonic inlet velocity (based on the combination of inlet gas velocity and tangential speed of the ramp) which compresses inlet gas against a stationary sidewall. In using this method to compress inlet gas, the supersonic compressor efficiently achieves high compression ratios while utilizing a compact, stabilized gasdynamic flow path. Operated at supersonic speeds, the inlet stabilizes an oblique/normal shock system in the gasdyanamic flow path formed between the rim of the rotor, the strakes, and a stationary external housing. Part load efficiency is enhanced by the use of a pre-swirl compressor, and using a bypass stream to bleed a portion of the intermediate pressure gas after passing through the pre-swirl compressor back to the inlet of the pre-swirl compressor. Inlet guide vanes to the compression ramp enhance overall efficiency.

Lawlor, Shawn P. (Bellevue, WA); Novaresi, Mark A. (San Diego, CA); Cornelius, Charles C. (Kirkland, WA)

2007-11-13T23:59:59.000Z