1

FY 2006 funded projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 Brookhaven National Laboratory FY 2006 LDRD PROJECTS LDRD Project Project Title P.I. Dept/Bldg. 03-104 Hydrogen Atom Transfer from Carbon to Metal - Relevance of a Novel Reaction to Catalyzed Hydrocarbon Conversions M. Bullock CHEM/555A 04-011 Femtosecond Photoinitiated Nanoparticle Surface Chemistry N. Camillone CHEM/555 04-013 Chirped Pulse Amplification at the DUV-FEL L.H. Yu NSLS/725C 04-025 Overcoming Coherent Instabilities at Medium- Energy Storage Rings J.-M. Wang NSLS/725C 04-033 Layered Cobaltates with High Thermoelectric Power Qiang Li MSD/480 04-038 Complex Thin Films and Nanomaterial Properties J. Misewich MSD/480 04-041 Lattice QCD relevant for RHIC and AGS P. Petreczky PHYS/510A 04-043 Very Long Baseline Neutrino Oscillation

2

Performance Period Total Fee Paid FY2001  

Broader source: Energy.gov (indexed) [DOE]

01 01 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400 $4,871,000 $6,177,902 October 2000 - September 2012 Minimum Fee $0 Fee Available EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations March 2013 $13,196,690 $9,262,042 $10,064,940 $14,828,770 $12,348,558 $12,204,247 $17,590,414 $17,856,774

3

FY09 WDI PROJECT FUNDING CUNY Unit Project Name  

E-Print Network [OSTI]

FY09 WDI PROJECT FUNDING CUNY Unit Project Name International Trade Operation & Procedures Program Simulation Lab College Initiative Bridge Program Workshop Project for Direct Care Workers Green Initiatives

Rosen, Jay

4

FY10 LDRD Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 LDRD Projects 0 LDRD Projects 2010 Projects Page 1 LDRD Proj. No. Project Title P.I. Dept./Bldg. 07-005 Sensitive Searches for CP-Violation in Hadronic Systems Semertzidis, Y. PHYS/510A 08-002 Strongly Correlated Systems: From Graphene to Quark-Gluon Plasma Kharzeev, D. & Tsvelik, A. PHYS/CMP 08-004 Getting to Know Your Constituents: Studies of Partonic Matter at the EIC Vogelsang, W. PHYS/510A 08-005 Development of the Deuteron EDM Proposal Semertzidis, Y. PHYS/510A 08-008 Development of a Small Gap Magnets and Vacuum Chamber for eRHIC Litvinenko, V. C-AD/817 08-022 Novel Methods for Microcrystal Structure Determination at NSLS and NSLS-II Orville, A. M. BIO/463 08-025 Combined PET/MRI Multimodality Imaging Probe Schlyer, D. Med/490 08-028 Genomic DNA Methylation: The Epigenetic Response of Arabidopsis Thaliana Genome

5

FY 2005 funded projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 LDRD PROJECTS 5 LDRD PROJECTS LDRD Project Project Title P.I. Dept/Bldg. 03-004 High-Brightness, High-Power Electron Beams I. Ben-Zvi CAD/817 03-056 Structural Properties of Methane Hydrates D. Mahajan ES&T/815 03-064 Investigation of Neutron and Gamma Probes to Detect Explosives in Sealed Containers M. Todosow ES&T/475B 03-094 Structural Studies on the Integral Membrane Protein AlkB J. Shanklin BIO/463 03-099 The microPET Study of Gene Expression in Rodents P. Thanos MED/490 03-104 Hydrogen Atom Transfer from Carbon to Metal - Relevance of a Novel Reaction to Catalyzed Hydrocarbon Conversions M. Bullock CHEM/555A 03-105 Radioprotection in D. Radiodurans, a Radiation Resistant Bacterium D. Cabelli CHEM/555A 03-107 New Development of Norepinephrine Transporter

6

FY 2004 funded projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 LDRD PROJECTS 4 LDRD PROJECTS LDRD Proj. Project Title P.I. Dept/Bldg. 02-02 Crystallization and X-ray Analysis of Membrane Proteins D. Fu BIO/463 02-08 Creating a MicroMRI Facility for Research and Development H. Benveniste MED/490 02-09 Targeting Tin-117m to Estrogen Receptors for Breast Cancer Therapy K. Kolsky MED/801 02-22 Electrical Systems Reliability R. Bari ES&T/475B 02-45 Combined Use of Radiotracers and Positron Emission Imaging in Understanding the Integrated Response of Plants to Environmental Stress R. Ferrieri CHEM/901 02-70 Theory of Electronic Transport in Nanostructures and Low-Dimensional Systems A. Tsvelik CMP/510A 02-71 Pressure in Nanopores T. Vogt CMP/510B 02-84a Genomic SELEX to Study Protein DNA/RNA Interactions in Ralstonia metallidurans CH34

7

Project Impact Assessments: Building America FY14 Field Test...  

Broader source: Energy.gov (indexed) [DOE]

Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Project Impact Assessments: Building America FY14 Field Test Technical Support...

8

Building America FY14 Research Projects by Research Team | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Research Projects by Research Team Building America FY14 Research Projects by Research Team This table shows the U.S. Department of Energy Building America FY14 research projects...

9

Advanced Energy Projects: FY 1993, Research summaries  

SciTech Connect (OSTI)

AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included.

Not Available

1993-09-01T23:59:59.000Z

10

Building America FY14 Projects by Building Type  

Broader source: Energy.gov [DOE]

This table lists U.S. Department of Energy Building America FY14 research projects by building type.

11

NREL Energy Storage Projects: FY2013 Annual Report  

SciTech Connect (OSTI)

In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

2014-07-01T23:59:59.000Z

12

FY 2014 LDRD Report  

Broader source: Energy.gov [DOE]

The total FY 2014 LDRD Program cost at the national laboratories was $527 million in 1,662 projects.

13

FY 2007 Total System Life Cycle Cost, Pub 2008 | Department of...  

Office of Environmental Management (EM)

FY 2007 Total System Life Cycle Cost, Pub 2008 FY 2007 Total System Life Cycle Cost, Pub 2008 The Analysis of the Total System Life Cycle Cost (TSLCC) of the Civilian Radioactive...

14

FY11 Approved LDRD Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Approved LDRD Projects Approved LDRD Projects 2011 Projects Page 1 LDRD Proj. No. Project Title P.I. Dept./Bldg. Directorate 08-002 Strongly Correlated Systems: From Graphene to Quark-Gluon Plasma Kharzeev, D. & Tsvelik, A. PHYS/CMP NPP/BES 08-028 Genomic DNA Methylation: The Epigenetic Response of Arabidopsis Thaliana Genome to Long-term Elevated Atmospheric Temperature and CO 2 in Global Warming Liu, Q. MED/490 & BIO/463 ELS 09-001 Nanoscale Anode Materials for Lithium Batteries Graetz, J. ES&T/ERD GARS 09-002 Bioconversion of Lignocellulose to Ethanol and Butanol Facilitated by Ionic Liquid Preprocessing Francis, A. J./Wishart, J.F./Dunn, J. ES/Chem./Biol ogy ELS 09-003 Organic Photovoltaics: Nanostructure, Solvent Annealing and Performance Ocko, B. PM/510B BES 09-004 Surface Chemisty and

15

FY12 Approved LDRD Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Approved LDRD Projects 2 Approved LDRD Projects 2012 Projects Page 1 LDRD Proj. No. Project Title P.I. Dept./Bldg. Directorate 09-001 Nanoscale Anode Materials for Lithium Batteries Graetz, J. ST/815 GARS 09-003 Organic Photovoltaics: Nanostructure, Solvent Annealing and Performance Ocko, B. PM/510B BES 10-006 Solar Energy Source Evaluation for Smart Grid Development Yue, Meng ES&T/130 GARS 10-007 High Throughput Quantitative Biochemical Phenotyping Rogers, Alistair ES/EE ELS 10-010 Development of an Ultrafast Electron Diffraction Facility for Condensed Matter Physics Challenges Hill, J. CMP/510B BES 10-012 Design of Pt-free Electrocatalysts for Fuel Cell Oxygen Reduction Reactions Khalifah, P. Chemistry/555 BES 10-014 Charge Generation and Transport in Films of Conjugated Polymers for Organic Photovoltaics BNL Part of a

16

Project Title and Principal Investigators FY 2014 Federal  

E-Print Network [OSTI]

Sea Grant Program Project Title and Principal Investigators FY 2014 Federal Funding * FY 2014, NY, RI, WHOI Buy Out or Build Back? A Comparative Assessment of Approaches to Employing Public Stewards Academies in Maryland (Dana R. Fisher) $69,999 $35,007 MI Development of Stable Open Channel

17

FY 2014 Solid Oxide Fuel Cell Project Selections  

Broader source: Energy.gov [DOE]

In FY 2014, nine research projects focused on advancing the reliability, robustness, and endurance of solid oxide fuel cells (SOFC) have been selected for funding by Office of Fossil Energy’s...

18

Environmental Restoration Projects FY10 Performance  

E-Print Network [OSTI]

Pollution Prevention Safety Performance Looking forward: FY11 Goals and Objectives 2 #12;3 FY Planning Plan (Dec) #12;7 ERP Environmental Aspects Radioactive, Hazardous, Mixed & Regulated Industrial Waste Generation Historical Contamination Atmospheric Discharges Liquid Discharges Storage or Use of Chemicals

Homes, Christopher C.

19

Ferrocyanide Safety Project: FY 1991 annual report  

SciTech Connect (OSTI)

The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy`s Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

1992-06-01T23:59:59.000Z

20

Ferrocyanide Safety Project: FY 1991 annual report  

SciTech Connect (OSTI)

The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in the single-shell waste storage tanks (SSTs), in particular the risk of explosion. This Task Team, which is composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), an outside consultants, was formed in response to the need for an updated analysis of safety questions on the Hanford SSTSs. The Ferrocyanide Safety Project, discussed in this report, is being conducted by PNL as part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, which is sponsored by the US Department of Energy's Tank Safety Project Office, is to provide technical information on ferrocyanide chemistry and its interaction and reactive behavior with other tank constituents. Ultimately, this information will be used to maintain the tanks in a safe condition, implement interim stabilization strategies, and identify optimal disposal options. While by itself ferrocyanide is a stable complex of ferrous ion and cyanide, it can be made to explode in the laboratory in the presence of oxidizing materials such as nitrates and/or nitrites temperatures above 280{degree}C or by sufficient electrical spark. The specific goal of the PNL project is so determine the conditions necessary for the ferrocyanide-bearing wastes in Hanford SSTs to represent a hazard, to determine the conditions where these same wastes am not a hazard, or to determine the conditions which are necessary to assure the wastes are safe prior to treatment for permanent disposal. This annual report gives the results of the work conducted by PNL in FY 1991. The activities mainly focused on preparing and characterizing synthetic wastes and alkali nickel ferrocyanides produced using the In-Farm cesium scavenging flowsheet and pure potential nickel ferrocyanides that could be produced by all of the cesium scavenging flowsheets.

Hallen, R.T.; Burger, L.L.; Hockey, R.L.; Lilga, M.A.; Scheele, R.D.; Tingey, J.M.

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Hanford analytical sample projections FY 1998--FY 2002  

SciTech Connect (OSTI)

Sample projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Sample projections are categorized by radiation level, protocol, sample matrix and Program. Analyses requirements are also presented.

Joyce, S.M.

1997-12-10T23:59:59.000Z

22

FY 2012 LDRD Report  

Broader source: Energy.gov [DOE]

The total FY 2012 LDRD Program cost at the national laboratories was $578.9 million in 1,738 projects.

23

FY 2013 LDRD Report  

Broader source: Energy.gov [DOE]

The total FY 2013 LDRD Program cost at the national laboratories was $568.6 million in 1,742 projects.

24

Hanford analytical sample projections FY 1998--FY 2002  

SciTech Connect (OSTI)

Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.

Joyce, S.M.

1998-02-12T23:59:59.000Z

25

FY 2009 Performance Goals Artificial Retina Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FY 2009 Performance Goals FY 2009 Performance Goals 2009 Annual Goal: Advance blind patient sight. FY09: Complete in vitro/benchtop development of implantable 200+ electrode prototype. 2009 Annual Goal Met: The bench-top development of an implantable 200+ electrode prototype has been completed. All the components of the 200+ electrode prototype have been integrated and characterized. Performance Goal/Annual Target Quarter Quarter Goal Quarterly Results: Yes or No? 1st Quarter Build electronics module for implantable active A-200+ system Goal Met. The electronics module for an implantable active A-200+ system was assembled and tested. It is a key component required to fabricate the active A-200+ prototype system. 2nd Quarter Complete fabrication of active A - 200+ Prototype system

26

Environmental management compliance reengineering project, FY 1997 report  

SciTech Connect (OSTI)

Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

VanVliet, J.A.; Davis, J.N.

1997-09-01T23:59:59.000Z

27

Geothermal R&D Program FY 1988 Project Summaries  

SciTech Connect (OSTI)

This report summarizes DOE Geothermal R&D subprograms, major tasks, and projects. Contract funding amounts are shown. Many summaries have references (citations) to the researchers' previous related work. These can be useful. Geothermal budget actual amounts are shown for FY 1984 -1988. (DJE 2005)

None

1988-10-01T23:59:59.000Z

28

E-Print Network 3.0 - area project fy2005 Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

. Progress during FY 2005 This project was recently funded, and the University of Hawaii Committee on Human... JIMAR - PFRP ANNUAL REPORT FOR FY 2005 P.I.Sponsor Name: Edward W....

29

FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01  

E-Print Network [OSTI]

FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01 Title: Hungry Horse Mitigation/Flathead Lake Confederated Salish and Kootenai Tribes A. Abstract This project was initiated in 1992 after NPCC annual funding since that time. This project specifically addresses the losses on the Flathead Indian

30

Climate Fund Source Project Reports FY13 Page 1 of 95  

E-Print Network [OSTI]

Climate Fund Source Project Reports FY13 Page 1 of 95 Program AK Project Title Sea Grant Climate. This project will benefit other coastal communities facing risks from climate change in two primary ways. First Grant); #12;Climate Fund Source Project Reports FY13 Page 2 of 95 Partner Alaska Native Tribal Health

31

FY 2007 Total System Life Cycle Cost, Pub 2008 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FY 2007 Total System Life Cycle Cost, Pub 2008 FY 2007 Total System Life Cycle Cost, Pub 2008 FY 2007 Total System Life Cycle Cost, Pub 2008 The Analysis of the Total System Life Cycle Cost (TSLCC) of the Civilian Radioactive Waste Management Program presents the Office of Civilian Radioactive Waste Management's (OCRWM) May 2007 total system cost estimate for the disposal of the Nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The TSLCC analysis provides a basis for assessing the adequacy of the Nuclear Waste Fund (NWF) Fee as required by Section 302 of the Nuclear Waste Policy Act of 1982 (NWPA), as amended. In addition, the TSLCC analysis provides a basis for the calculation of the Government's share of disposal costs for government-owned and managed SNF and HLW. The TSLCC estimate includes both historical costs and

32

Bartlesville Project Office FY 1989 annual report  

SciTech Connect (OSTI)

The Bartlesville Project Office (BPO) was established in 1983 to succeed the Bartlesville Energy Technology Center (BETC). Its lead mission from the Office of Fossil Energy (FE) of the US Department of Energy is to plan and implement research in the Enhanced Oil Recovery (EOR) and Advanced Extraction and Process Technology (AEPT) subprograms of the Petroleum Program. As such, BPO oversees more than 140 research projects falling within these two broad subprograms and support activities. These projects form the major portion of the DOE's National Petroleum Research Program, the critical aim of which is to arrest the decline of domestic oil production and to maximize economic recovery. Project achievements, descriptions and goals are described. 8 figs., 2 tabs.

Not Available

1990-04-01T23:59:59.000Z

33

Calculating Cost Savings from FY08 Pollution Prevention Projects Purpose: To ensure a standard and credible method is used to compare the cost savings of all pollution prevention  

E-Print Network [OSTI]

Calculating Cost Savings from FY08 Pollution Prevention Projects Purpose: To ensure a standard and credible method is used to compare the cost savings of all pollution prevention proposals, allowing `apples = UTotal Project Cost Annual Project Savings Total Project Cost = all costs for implementation, including

34

Bartlesville Project Office FY 1990 Annual report  

SciTech Connect (OSTI)

The Bartlesville Project Office (BPO) was established in 1983 to succeed the Bartlesville Energy Technology Center (BETC). Its lead mission from the Office of Fossil Energy (FE) of the US Department of energy is to plan and implement research in the Enhanced Oil Recovery (EOR) and Advanced Extraction and Process Technology (AEPT) subprograms of the Petroleum Program. As such, BPO oversees some 160 research projects falling within these two broad subprograms and support activities. These projects, form the major portion of DOE's National Petroleum Research Program. The EOR subprogram consists of two research categories: Light Oil and Heavy Oil. These two categories include research activities in: (1) geoscience and reservoir characterization, (2) chemical flooding (3) gas flooding, (4) thermal recovery, (5) novel technology, and (6) microbial EOR. The AEPT subprogram includes research activities in (1) fundamental geoscience and extraction research, (2) supporting technology and environmental research, and (3) university geoscience research. 8 figs., 5 tabs.

Not Available

1991-04-01T23:59:59.000Z

35

Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1994--FY 2001. Environmental Restoration Program, September 1993 Revision  

SciTech Connect (OSTI)

This Waste Generation Forecast for DOE-ORO`s Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993.

Not Available

1993-12-01T23:59:59.000Z

36

The following National Sea Grant aquaculture research projects were awarded in FY2010-Program Investigator Investigator Affiliation Project Title  

E-Print Network [OSTI]

The following National Sea Grant aquaculture research projects were awarded in FY2010- 2011: Sea Grant College Program Investigator Investigator Affiliation Project Title FY 10-11 Federal Share* Alaska Sea Grant Eckert University of Alaska Fairbanks Red King Crab Aquaculture in Alaska - Release

37

FY 2008-2018 F&W Program Project Solicitation Section 10. Narrative  

E-Print Network [OSTI]

FY 2008-2018 F&W Program Project Solicitation Section 10. Narrative Project ID: 2008-301-00 Lead Transport Inc. 1999 gasoline spill settlement fund. It is anticipated that over the next ten years (2008

38

Tank Vapor Characterization Project: Annual status report for FY 1996  

SciTech Connect (OSTI)

In Fiscal Year 1996, staff at the Vapor Analytical Laboratory at Pacific Northwest National Laboratory performed work in support of characterizing the vapor composition of the headspaces of radioactive waste tanks at the Hanford Site. Work performed included support for technical issues and sampling methodologies, upgrades for analytical equipment, analytical method development, preparation of unexposed samples, analyses of tank headspaces samples, preparation of data reports, and operation of the tank vapor database. Progress made in FY 1996 included completion and issuance of 50 analytical data reports. A sampling system comparison study was initiated and completed during the fiscal year. The comparison study involved the vapor sampling system (VSS), a truck-based system, and the in situ vapor sampling system (ISVS), a cart-based system. Samples collected during the study were characterized for inorganic, permanent gases, total non-methane organic compounds and organic speciation by SUMMA{trademark} and TST methods. The study showed comparable sampling results between the systems resulting in the program switching from the VSS to the less expensive ISVS methodology in late May 1996. A temporal study was initiated in January 1996 in order to understand the influences seasonal temperatures changes have on the vapors in the headspace of Hanford waste tanks. A holding time study was initiated in the fourth quarter of FY 1996. Samples were collected from tank S-102 and rushed to the laboratory for time zero analysis. Additional samples will be analyzed at 1, 2, 4, 8, 16, and 32 weeks.

Silvers, K.L.; Fruchter, J.S.; Huckaby, J.L.; Almeida, T.L.; Evans, J.C. Jr.; Pool, K.H.; Simonen, C.A.; Thornton, B.M.

1997-01-01T23:59:59.000Z

39

Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries  

SciTech Connect (OSTI)

The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

Dena Tomchak

2014-03-01T23:59:59.000Z

40

FY10 WDI PROJECT FUNDING CUNY Unit Project Name  

E-Print Network [OSTI]

Curriculum and Technology for Digital Image and Video Processing CUIS Internship Energy Program Kingsborough Project for New Supervisors and Direct Care Professionals Greening Your Facility: Performing Energy Audits and Promoting Safety Wind Turbines/Wind Power in an Urban Setting CUNY Institute for Software Design

Rosen, Jay

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Solar total energy project Shenandoah  

SciTech Connect (OSTI)

This document presents the description of the final design for the Solar Total Energy System (STES) to be installed at the Shenandoah, Georgia, site for utilization by the Bleyle knitwear plant. The system is a fully cascaded total energy system design featuring high temperature paraboloidal dish solar collectors with a 235 concentration ratio, a steam Rankine cycle power conversion system capable of supplying 100 to 400 kW(e) output with an intermediate process steam take-off point, and a back pressure condenser for heating and cooling. The design also includes an integrated control system employing the supervisory control concept to allow maximum experimental flexibility. The system design criteria and requirements are presented including the performance criteria and operating requirements, environmental conditions of operation; interface requirements with the Bleyle plant and the Georgia Power Company lines; maintenance, reliability, and testing requirements; health and safety requirements; and other applicable ordinances and codes. The major subsystems of the STES are described including the Solar Collection Subysystem (SCS), the Power Conversion Subsystem (PCS), the Thermal Utilization Subsystem (TUS), the Control and Instrumentation Subsystem (CAIS), and the Electrical Subsystem (ES). Each of these sections include design criteria and operational requirements specific to the subsystem, including interface requirements with the other subsystems, maintenance and reliability requirements, and testing and acceptance criteria. (WHK)

None

1980-01-10T23:59:59.000Z

42

FY 2012 Budget Request Advanced Research Projects Agency - Energy...  

Energy Savers [EERE]

April 10, 2013 FY 2014 Budget Request Office of Electricity Delivery and Energy Reliability Office of Electricity Delivery and Energy Reliability 2 The Importance of a Modern Grid...

43

FY 2012 Budget Request Advanced Research Projects Agency - Energy  

Energy Savers [EERE]

March 4, 2014 FY 2015 Budget Request Office of Electricity Delivery and Energy Reliability Office of Electricity Delivery and Energy Reliability 2 The Importance of a Modern Grid...

44

FY 2014 Research Projects on CO2 Storage in Enhanced Oil Recovery  

Broader source: Energy.gov [DOE]

In FY 2014, the U.S. Department of Energy selected five projects focused on advancing the state of knowledge and developing and validating technologies that would allow for more effective storage...

45

FY 2014 Projects for Improving the Design, Construction, and Operation of Fossil Energy Systems  

Broader source: Energy.gov [DOE]

In FY 2014, the U.S. Department of Energy selected 38 new projects from across the nation under the Crosscutting Research Program that target innovative concepts and technologies to improve...

46

Project Functions and Activities Definitions for Total Project Cost  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides guidelines developed to define the obvious disparity of opinions and practices with regard to what exactly is included in total estimated cost (TEC) and total project cost (TPC).

1997-03-28T23:59:59.000Z

47

Development of gridded mobile source emission estimates for Nueces County FY93, FY96, FY99, and FY07 in support of the Coast project. Interim research report, April 1992-August 1996  

SciTech Connect (OSTI)

The report documents the procedures used by the Texas Transportation Institute in developing Neuces County Mobile Source Emissions Inventories for FY93, FY96, FY99, and FY07. The emissions inventories are submitted in support of the Coastal Oxidant Assessment for Southeast Texas (COAST) Project. COAST is a large-scale study conducted by the Texas Natural Resource Conservation Commission to model the formation of ozone in the Houston-Galveston and Beaumont-Port Arthur air quality nonattainment areas. The software used for these procedures is described in Research Report 1279-9, `Texas Mobile Source Emissions Software Version 2.0: User`s Manual.` No further implementation of the materials in this report is needed.

Knowles, W.E.; Dresser, G.B.

1995-08-01T23:59:59.000Z

48

FY 2015 Budget Request Webinar  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

based on actual integrated biorefinery project plant performance data. eere.energy.gov 19 Bioenergy Technologies - FY 2015 Budget Request (Dollars in Thousands) FY 2013 Current FY...

49

ARPA-E FY2010 Annual Report Highlights Transformational Projects Since  

Broader source: Energy.gov (indexed) [DOE]

FY2010 Annual Report Highlights Transformational Projects FY2010 Annual Report Highlights Transformational Projects Since Agency's Establishment ARPA-E FY2010 Annual Report Highlights Transformational Projects Since Agency's Establishment June 22, 2011 - 10:30am Addthis Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs What does this mean for me? ARPA-E has funded 121 projects -- in amounts ranging from roughly $400,000 to $9 million, with an average award value of $3 million -- which have the potential to transform our Nation's energy future. Private investments have not only signaled commercial potential, but are helping projects accelerate technical development, create jobs and acquire capital equipment and facilities. It's hard to believe the Advanced Research Projects Agency-Energy (ARPA-E)

50

Hangman Restoration Project Year-End Report FY2008.  

SciTech Connect (OSTI)

This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

Coeur d'Alene Tribe Department of Natural Resources.

2008-11-12T23:59:59.000Z

51

FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2  

SciTech Connect (OSTI)

Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

Not Available

1991-02-01T23:59:59.000Z

52

Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report  

SciTech Connect (OSTI)

This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na{sub 2}NiFe(CN){sub 6}, and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na{sub 2}NiFe(CN){sub 6} in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH){sub 2} and soluble Na{sub 4}Fe(CN){sub 6}. The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly.

Lilga, M.A.; Alderson, E.V.; Hallen, R.T. [and others

1995-09-01T23:59:59.000Z

53

W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status  

SciTech Connect (OSTI)

This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting. The principle findings include: (1) a clear indication that in most settings, bare-root seedling survival is considerably higher than tubling survival; (2) we can expect low plant survival at sites with a high cover of large native bunchgrasses--especially bluebunch wheatgrass; (3) mycorrhizal root treatments appeared to increase growth and survival at the Coppice Dune and 98-Burn Undisturbed sites, but appeared to have little effect at the 98-Burn Disturbed, 111-Road Sitanion, or Cold Creek sites; (4) use of a hydrogel dip at planting increases survival of bare-root plants compared to dipping roots in plain water; (5) reducing leaf area via clipping after planting did not increase survival of bare-root plants; (6) seedlings planted on a south-aspect hillside at the Lower Cold Creek planting area had higher survival than seedlings planted on the hilltop or northern-aspects although these survival rates were lower than the survival rate down on the flats at this same location. Rectification of the transmission line corridor occurred in early March 2001, with the broadcast seeding of Sandberg's bluegrass and sagebrush. Success criteria for this site-of-disturbance rectification required a grass establishment after four years with greater than 25% total canopy cover with 60% of the plant cover from planted species (DOE 1998). This planting met the total canopy criterion but failed the criterion of 60% relative coverage of planted species. Although the performance standard was not met, the planting is not necessarily a failure; the communities on the tower pads appear to be developing toward the desired end state. We feel that there are no reasonable mitigative actions that can be taken at this time that would significantly alter or speed up the plant community development on these sites. In fact, most options, such as overseeding, may cause damage to the currently establishing communities on those sites.

Durham, Robin E.; Sackschewsky, Michael R.

2004-09-30T23:59:59.000Z

54

CRSP South Capital Investment Plan FY12-FY21 Detail  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9/2011 9/2011 CRSP South Capital Investment Plan FY12-FY21 Detail Yellow Highlight = New Project to list W Total = Western Only Costs Red Text = Change from previous version O Total = Trust and Joint Participation Costs Blue Text = will be removed from list FY Total = Sum of W Total and O Total Green Highlight = Annual Equipment Replacement Programs MPS Split = Multiple Power System Cost Split. Fund PROJECT PROJECT Power Sys TOTAL W Total W PD W Non-PD O Total FY TOTAL W Total W PD W Non-PD O Total FY TOTAL Transmission Lines Environmental Support for Lands, Access Roads, and ROW's CRSPVMF 450 110 10 100 110 110 10 100 110 Lidar Closeout at Pinnacle Peak and Rogers CRSPVMF 15 15 15 15 Pinnacle Peak-Rogers ROW Agreement CRSPVMF 6,100 6,100 100 6,000 6,100 T-Line SubTotal 6,565 125 25 100 125 6,210 110

55

Project Listings by State, DOE Hydrogen Program FY 2010 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2010 Annual Progress Report DOE Hydrogen Program Alabama V.B.2 CFD Research Corp.: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 V.B.2 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 Alaska VIII.9 Tanadgusix Foundation: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 TDX Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 Alaska Center for Energy and Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . 1288

56

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration  

E-Print Network [OSTI]

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration Kittitas draft province recommendations). The conservation easements acquisition costs qualify for funding by BPA $1,020,000 BPA Fish & Wildlife Expense Budget (as recommended) $1,024,000 BPA Capital Budget (for

57

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

58

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

59

L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report  

SciTech Connect (OSTI)

Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimum number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.

Durham, Robin E.; Sackschewsky, Michael R.

2009-09-29T23:59:59.000Z

60

FY 2012 Budget Request Advanced Research Projects Agency - Energy  

Broader source: Energy.gov (indexed) [DOE]

Office of Nuclear Energy FY 2014 Budget Request April 10, 2013 Peter Lyons Assistant Secretary for Nuclear Energy U.S. Department of Energy Nuclear Energy President Obama's Commitment to Clean Energy 2 "With rising oil prices and a warming climate, nuclear energy will only become more important. That's why, in the United States, we've restarted our nuclear industry as part of a comprehensive strategy to develop every energy source." President Barack Obama Seoul, Republic of Korea March 2012 Nuclear Energy Department of Energy Mission and Goals DOE Mission The mission of the Department of Energy is to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

FY 2012 Budget Request Advanced Research Projects Agency - Energy  

Broader source: Energy.gov (indexed) [DOE]

Hoffman, Assistant Secretary Hoffman, Assistant Secretary April 10, 2013 FY 2014 Budget Request Office of Electricity Delivery and Energy Reliability Office of Electricity Delivery and Energy Reliability 2 The Importance of a Modern Grid "...A smarter, modernized, and expanded grid can serve as a platform for American leadership in a clean and secure energy future and power a National economy that is built to last." - A Policy Framework for the 21 st Century Grid: A Progress Report White House Report, February 2013 Office of Electricity Delivery and Energy Reliability Mission and Goals The Office of Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy infrastructure. OE supports the DOE mission and its goals:

62

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

63

Table 12. Total Coal Consumption, Projected vs. Actual Projected  

U.S. Energy Information Administration (EIA) Indexed Site

Total Coal Consumption, Projected vs. Actual Total Coal Consumption, Projected vs. Actual Projected (million short tons) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 920 928 933 938 943 948 953 958 962 967 978 990 987 992 1006 1035 1061 1079 AEO 1995 935 940 941 947 948 951 954 958 963 971 984 992 996 1002 1013 1025 1039 AEO 1996 937 942 954 962 983 990 1004 1017 1027 1033 1046 1067 1070 1071 1074 1082 1087 AEO 1997 948 970 987 1003 1017 1020 1025 1034 1041 1054 1075 1086 1092 1092 1099 1104 AEO 1998 1009 1051 1044 1058 1087 1084 1090 1097 1112 1130 1142 1148 1160 1162 1180 AEO 1999 1040 1075 1092 1109 1113 1118 1120 1120 1133 1139 1150 1155 1156 1173 AEO 2000 1053 1086 1103 1124 1142 1164 1175 1184 1189 1194 1199 1195 1200 AEO 2001 1078 1112 1135 1153 1165 1183 1191 1220 1228 1228 1235 1240

64

Advanced Neutron Source (ANS) Project progress report FY 1992  

SciTech Connect (OSTI)

This report discusses project management, research and development, design, and safety at the Advanced Neutron Source facility.

Campbell, J.H. (ed.); Selby, D.L.; Harrington.

1993-01-01T23:59:59.000Z

65

California Hydrogen Infrastructure Project - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Edward C. Heydorn Air Products and Chemicals, Inc. 7201 Hamilton Boulevard Allentown, PA 18195 Phone: (610) 481-7099 Email: heydorec@airproducts.com DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Jim Alkire Phone: (720) 356-1426 Email: James.Alkire@go.doe.gov Contract Number: DE-FC36-05GO85026 Working Partners/Subcontractors: * University of California Irvine (UCI), Irvine, CA * National Fuel Cell Research Center (NFCRC), Irvine, CA Project Start Date: August 1, 2005 Project End Date: December 31, 2011 Fiscal Year (FY) 2012 Objectives Demonstrate a cost-effective infrastructure model in

66

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

First Quarter First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 1st Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

67

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 2nd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 96% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

68

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 4th Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

69

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 3rd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 98% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

70

ProjectList 11072013.xlsx  

Broader source: Energy.gov (indexed) [DOE]

LDRD Project List - FY 2013 LDRD Project List - FY 2013 Project ID Project Name FY Total FY2013-AKI-0310 Demistifying the hydration layer on nano oxide in suspensions by liquid cell TEM $50,758 FY2013-FAN-0313 In Situ, Real Time Imaging of Single Site Catalysts under Turnover Conditions $94,056 FY2013-GOR-1218 Dynamic Whitelist Generation for Automated Intrusion Response $69,043 FY2013-HUA-0413 Atomic and electronic level control of nanocluster catalysts encapsulated in MOFs $100,073 FY2013-JON-0114 Rapid, Small-Scale, High-Purity Rare Earth Metal Preparation $55,284 FY2013-WAN-0113 Femtosecond-Resolved Polarimetry Probes of Electronic Nematicity in Iron Pnictides $48,391 P/ANL2010-194 Acceleration of Cloud Microphysical Retrievals for Climate Models $102,400

71

FY 2014 Solid Oxide Fuel Cell Project Selections | Department...  

Office of Environmental Management (EM)

Effects and Degradation in Solid Oxide Fuel Cells: Understanding Transport and Thermodynamics." The goals of this project are to: 1) understand the detailed mechanisms of...

72

Magma Energy Research Project, FY80 annual progress report  

SciTech Connect (OSTI)

The technical feasibility of extracting energy from magma bodies is explored. Five aspects of the project are studied: resource location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction.

Colp, J.L. (ed.)

1982-04-01T23:59:59.000Z

73

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect (OSTI)

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

74

Waste generation forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1995-FY 2002, September 1994 revision  

SciTech Connect (OSTI)

A comprehensive waste-forecasting task was initiated in FY 1991 to provide a consistent, documented estimate of the volumes of waste expected to be generated as a result of U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) Environmental Restoration (ER) OR-1 Project activities. Continual changes in the scope and schedules for remedial action (RA) and decontamination and decommissioning (D&D) activities have required that an integrated data base system be developed that can be easily revised to keep pace with changes and provide appropriate tabular and graphical output. The output can then be analyzed and used to drive planning assumptions for treatment, storage, and disposal (TSD) facilities. The results of this forecasting effort and a description of the data base developed to support it are provided herein. The initial waste-generation forecast results were compiled in November 1991. Since the initial forecast report, the forecast data have been revised annually. This report reflects revisions as of September 1994.

Not Available

1994-12-01T23:59:59.000Z

75

Moses Lake Fishery Restoration Project : FY 1999 Annual Report.  

SciTech Connect (OSTI)

The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

None given

2000-12-01T23:59:59.000Z

76

Property:Geothermal/TotalProjectCost | Open Energy Information  

Open Energy Info (EERE)

TotalProjectCost TotalProjectCost Jump to: navigation, search Property Name Geothermal/TotalProjectCost Property Type Number Description Total Project Cost Pages using the property "Geothermal/TotalProjectCost" Showing 25 pages using this property. (previous 25) (next 25) A A 3D-3C Reflection Seismic Survey and Data Integration to Identify the Seismic Response of Fractures and Permeable Zones Over a Known Geothermal Resource at Soda Lake, Churchill Co., NV Geothermal Project + 14,571,873 + A Demonstration System for Capturing Geothermal Energy from Mine Waters beneath Butte, MT Geothermal Project + 2,155,497 + A Geothermal District-Heating System and Alternative Energy Research Park on the NM Tech Campus Geothermal Project + 6,135,381 + A new analytic-adaptive model for EGS assessment, development and management support Geothermal Project + 1,629,670 +

77

Table 16. Total Energy Consumption, Projected vs. Actual Projected  

U.S. Energy Information Administration (EIA) Indexed Site

Total Energy Consumption, Projected vs. Actual Total Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 88.0 89.5 90.7 91.7 92.7 93.6 94.6 95.7 96.7 97.7 98.9 100.0 100.8 101.7 102.7 103.6 104.3 105.2 AEO 1995 89.2 90.0 90.6 91.9 93.0 93.8 94.6 95.3 96.2 97.2 98.4 99.4 100.3 101.2 102.1 102.9 103.9 AEO 1996 90.6 91.3 92.5 93.5 94.3 95.1 95.9 96.9 98.0 99.2 100.4 101.4 102.1 103.1 103.8 104.7 105.5 AEO 1997 92.6 93.6 95.1 96.6 97.9 98.8 99.9 101.2 102.4 103.4 104.7 105.8 106.6 107.2 107.9 108.6 AEO 1998 94.7 96.7 98.6 99.8 101.3 102.4 103.4 104.5 105.8 107.3 108.6 109.9 111.1 112.2 113.1 AEO 1999 94.6 97.0 99.2 100.9 102.0 102.8 103.6 104.7 106.0 107.2 108.5 109.7 110.8 111.8

78

FY2010 2018 Fish and Wildlife Program Project Solicitation  

E-Print Network [OSTI]

Idaho Wildlife Mitigation-Middle Snake #12;2 A. Abstract The Southern Idaho Wildlife Mitigation project (SIWM) of the Idaho Department of Fish and Game (IDFG) proposes implementation of wildlife mitigation and/or scientific background In both the Mid and Upper Snake Provinces, human development

79

Laboratory Technology Research: Abstracts of FY 1996 projects  

SciTech Connect (OSTI)

The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of this country: the world-class basic research capability of the DOE Energy Research (ER) multi-program national laboratories and the unparalleled entrepreneurial spirit of American industry. Projects supported by the LTR program are conducted by the five ER multi-program laboratories: Argonne, Brookhaven, Lawrence Berkeley, Oak Ridge, and Pacific Northwest National Laboratories. These projects explore the applications of basic research advances relevant to Department of Energy`s (DOE) mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials, intelligent processing/manufacturing research, and sustainable environments.

NONE

1996-12-31T23:59:59.000Z

80

FY 1996 Summary of Hot Dry Rock Geothermal Power Project  

SciTech Connect (OSTI)

The report describes progress and status of the HDR project at Hijiori. The year was notable for a flow enhancement test of a system with two production wells in operation. Other items include a geochemical survey, reinterpretation of acoustic emission data from 1988 through 1995, borehole measurements to find intersections with fractures, a geological survey, preparation for modeling fractures, improvements in crack simulation in a reservoir analysis model, and environmental survey work. (DJE 2005)

None

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Advanced Neutron Source (ANS) Project. Progress report FY 1993  

SciTech Connect (OSTI)

This report covers the progress made in 1993 in the following sections: (1) project management; (2) research and development; (3) design and (4) safety. The section on research and development covers the following: (1) reactor core development; (2) fuel development; (3) corrosion loop tests and analysis; (4) thermal-hydraulic loop tests; (5) reactor control and shutdown concepts; (6) critical and subcritical experiments; (7) material data, structure tests, and analysis; (8) cold source development; (9) beam tube, guide, and instrument development; (10) neutron transport and shielding; (11) I and C research and development; and (12) facility concepts.

Campbell, J.H. [ed.; Selby, D.L.; Harrington, R.M. [Oak Ridge National Lab., TN (United States); Thompson, P.B. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States). Engineering Div.

1994-01-01T23:59:59.000Z

82

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

83

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

84

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

85

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

86

Laboratory technology research - abstracts of FY 1997 projects  

SciTech Connect (OSTI)

The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of this country: the world-class basic research capability of the DOE Energy Research (ER) multi-program national laboratories and the unparalleled entrepreneurial spirit of American industry. A distinguishing feature of the ER multi-program national laboratories is their ability to integrate broad areas of science and engineering in support of national research and development goals. The LTR program leverages this strength for the Nation`s benefit by fostering partnerships with US industry. The partners jointly bring technology research to a point where industry or the Department`s technology development programs can pursue final development and commercialization. Projects supported by the LTR program are conducted by the five ER multi-program laboratories. These projects explore the applications of basic research advances relevant to DOE`s mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials; intelligent processing/manufacturing research; and sustainable environments.

NONE

1997-11-01T23:59:59.000Z

87

Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.  

SciTech Connect (OSTI)

The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) stee

Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

2008-11-19T23:59:59.000Z

88

ESS 2012 Peer Review - DOE-OE FY12 Electrical Energy Storage Demonstration Projects - Dan Borneo, SNL  

Broader source: Energy.gov (indexed) [DOE]

DOE-OE FY12 Electrical DOE-OE FY12 Electrical Energy Storage Demonstration Projects The Renaissance Hotel Washington, D.C. September 2012 Presented by Dan Borneo SAND Document 5312608 SAND2012-7453 C Acknowledgements I would like to thank the DOE's Office of Electricity and Dr. Imre Gyuk, Program Manager of the Electrical Energy Storage Program, for their support and funding of the Energy Storage Demonstration Projects. 2 EES Emerging Technology Demonstrations Presentation Outline  Project Overview  Problem Statement  Approach  Current Status  Path Forward - Next Steps  Geographical Representation of Projects  Summary Chart of Projects  Brief Descriptions of Individual Projects  Concluding Remarks 3 EES Demonstrations Project Overview  Problem Statement

89

Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report  

SciTech Connect (OSTI)

This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier Mesa and USGS HGH No.2 WW2 located in Yucca Flat. In addition, three springs were sampled White Rock Spring and Captain Jack Spring in Area 12 on Rainier Mesa and Topopah Spring in Area 29. Chapter 3 is a compilation of existing noble gas data that has been reviewed and edited to remove inconsistencies in presentation of total vs. single isotope noble gas values reported in the previous HRMP and UGTA progress reports. Chapter 4 is a summary of the results of batch sorption and desorption experiments performed to determine the distribution coefficients (Kd) of Pu(IV), Np(V), U(VI), Cs and Sr to zeolitized tuff (tuff confining unit, TCU) and carbonate (lower carbonate aquifer, LCA) rocks in synthetic NTS groundwater Chapter 5 is a summary of the results of a series of flow-cell experiments performed to examine Np(V) and Pu(V) sorption to and desorption from goethite. Np and Pu desorption occur at a faster rate and to a greater extent than previously reported. In addition, oxidation changes occurred with the Pu whereby the surface-sorbed Pu(IV) was reoxidized to aqueous Pu(V) during desorption.

Culham, H W; Eaton, G F; Genetti, V; Hu, Q; Kersting, A B; Lindvall, R E; Moran, J E; Blasiyh Nuno, G A; Powell, B A; Rose, T P; Singleton, M J; Williams, R W; Zavarin, M; Zhao, P

2008-04-08T23:59:59.000Z

90

EV Community Readiness projects: American Lung Association of...  

Broader source: Energy.gov (indexed) [DOE]

2011 - End: June 2013 - 98% Complete * BUDGET - Total Project Funding: 500,000 * DOE: 500,000 * Cost Share: 0 - Funded w FY11 & FY12 funds - 498,997 spent as of 2113...

91

"DOE IDIQ ESPC Awarded Projects Summary  

Broader source: Energy.gov (indexed) [DOE]

DOE IDIQ ESPC Awarded Projects Summary DOE IDIQ ESPC Awarded Projects Summary " ,"Project Count","Project Investment","Contract Price","Guaranteed Cost Savings","Annual Energy Savings (btu x 10^6)","Cumulative Energy Savings (btu x 10^6)" "Total for FY 1998",5,6575201,14990629,17162375,60931,783240 "Total for FY 1999",15,40950583,93441996,94265528,340539,5660293 "Total for FY 2000",20,62161736,130641996,131703866,609730,9510029 "Total for FY 2001",31,126376566,259078354,273213735,869148,13374390 "Total for FY 2002",19,112866816,337364927,340061131,1032973,21194077 "Total for FY 2003",39,260867190,531558407,541848764,2543263,35515859 "Total for FY 2004",6,28366270,63938167,66492625,310836,5496755

92

Small Business Innovation Research (SBIR) Hydrogen Program New Projects Awarded in FY 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2011 Annual Progress Report DOE Hydrogen and Fuel Cells Program The Small Business Innovation Research (SBIR) program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve research and development (R&D) objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non-profit

93

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2013 Target FY 2013 Final FY...

94

Hydrologic Resources Management Program and Underground Test Area Project FY 2000 Progress Report  

SciTech Connect (OSTI)

This report highlights the results of FY 2000 technical studies conducted by the Analytical and Nuclear Chemistry Division (ANCD) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) Project. This is the latest in a series of annual reports published by LLNL-ANCD to document recent investigations of radionuclide migration and transport processes at the Nevada Test Site (NTS). The HRMP is sponsored by Defense Programs (DP) at the U.S. Department of Energy, Nevada Operations Office (DOENV), and supports DP operations at the NTS through studies of radiochemical and hydrologic processes that are relevant to the DP mission. Other organizations that support the HRMP include Los Alamos National Laboratory (LANL), the U.S. Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the U.S. Environmental Protection Agency (EPS), and Bechtel Nevada (BN). The UGTA Project is sponsored by the Environmental Management (EM) program at DOENV; its goal is to determine the extent of radionuclide contamination in groundwater resulting from underground nuclear testing at the NTS. The project strategy follows guidelines set forth in a Federal Facilities Agreement and Consent Order between the U.S. Department of Energy, the U.S. Department of Defense, and the State of Nevada. Participating contractors include LLNL (both ANCD and the Energy and Environmental Sciences Directorate), LANL, USGS, DRI, BN, and IT Corporation (with subcontract support from Geotrans Inc.).

Davisson, M L; Eaton, G F; Hakemi, N L; Hudson, G B; Hutcheon, I D; Lau, C A; Kersting, A B; Kenneally, J M; Moran, J E; Phinney, D L; Rose, T P; Smith, D K; Sylwester, E R; Wang, L; Williams, R; Zavarin, M

2001-07-01T23:59:59.000Z

95

Light Water Reactor Sustainability Constellation Pilot Project FY13 Summary Report  

SciTech Connect (OSTI)

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY13.

R. Johansen

2013-09-01T23:59:59.000Z

96

Light Water Reactor Sustainability Constellation Pilot Project FY12 Summary Report  

SciTech Connect (OSTI)

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY12.

R. Johansen

2012-09-01T23:59:59.000Z

97

Modular Pebble-Bed Reactor Project: Laboratory-Directed Research and Development Program FY 2002 Annual Report  

SciTech Connect (OSTI)

This report documents the results of our research in FY-02 on pebble-bed reactor technology under our Laboratory Directed Research and Development (LDRD) project entitled the Modular Pebble-Bed Reactor. The MPBR is an advanced reactor concept that can meet the energy and environmental needs of future generations under DOE’s Generation IV initiative. Our work is focused in three areas: neutronics, core design and fuel cycle; reactor safety and thermal hydraulics; and fuel performance.

Petti, David Andrew; Dolan, Thomas James; Miller, Gregory Kent; Moore, Richard Leroy; Terry, William Knox; Ougouag, Abderrafi Mohammed-El-Ami; Oh, Chang H; Gougar, Hans D

2002-11-01T23:59:59.000Z

98

FY 2008 Secretary Rollout  

Broader source: Energy.gov (indexed) [DOE]

Budget Budget Investing in Science and Energy Security February 5, 2007 1 The Focus * Investing in World-Class Science * Advancing Energy Security * Reducing Dependence on Foreign Sources of Energy * Promoting the Use of Clean Energy * Honoring our Commitments Supporting our Nation's Highest Priorities 2 DOE Budget : FY 2007 and FY 2008 ($ in Billions) National Security $9.3 Corporate Management $1.0 Science $4.1 Energy and Environment $9.2 FY 2007 Request $23.6 Billion FY 2008 Request $24.3 Billion FY 2008 request is $705 million above the FY 2007 request level. Energy and Environment $9.4 Science $4.4 National Security $9.4 Corporate Management $1.1 3 FY 2008 DOE Budget Breakout By Organization ($ in Millions) +$61 $1,041 $980 $967 Corporate Management/FERC +$705 $24,259 $23,554 $23,572 Total DOE

99

FY 2013 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/CF-0074 Volume 4 Science Advanced Research Projects Agency-Energy Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 4 DOE/CF-0074 Volume 4 Science Advanced Research Projects Agency-Energy Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Science Advanced Research Projects Agency- Energy Science Advanced Research Projects Agency- Energy Department of Energy/Science/ Advanced Research Projects Agency - Energy FY 2013 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary ............................................................................................................................................ 3

100

Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes  

SciTech Connect (OSTI)

This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

None

1980-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Table 16. Total Energy Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Energy Consumption, Projected vs. Actual" Total Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",88.02,89.53,90.72,91.73,92.71,93.61,94.56,95.73,96.69,97.69,98.89,100,100.79,101.7,102.7,103.6,104.3,105.23 "AEO 1995",,89.21,89.98,90.57,91.91,92.98,93.84,94.61,95.3,96.19,97.18,98.38,99.37,100.3,101.2,102.1,102.9,103.88 "AEO 1996",,,90.6,91.26,92.54,93.46,94.27,95.07,95.94,96.92,97.98,99.2,100.38,101.4,102.1,103.1,103.8,104.69,105.5 "AEO 1997",,,,92.64,93.58,95.13,96.59,97.85,98.79,99.9,101.2,102.4,103.4,104.7,105.8,106.6,107.2,107.9,108.6 "AEO 1998",,,,,94.68,96.71,98.61027527,99.81855774,101.254303,102.3907928,103.3935776,104.453476,105.8160553,107.2683716,108.5873566,109.8798981,111.0723877,112.166893,113.0926208

102

Table 4. Total Petroleum Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Petroleum Consumption, Projected vs. Actual" Total Petroleum Consumption, Projected vs. Actual" "Projected" " (million barrels)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",6449.55,6566.35,6643,6723.3,6810.9,6880.25,6956.9,7059.1,7124.8,7205.1,7296.35,7376.65,7446,7522.65,7595.65,7665,7712.45,7774.5 "AEO 1995",,6398.45,6544.45,6555.4,6675.85,6745.2,6821.85,6887.55,6964.2,7048.15,7146.7,7245.25,7336.5,7405.85,7471.55,7537.25,7581.05,7621.2 "AEO 1996",,,6489.7,6526.2,6606.5,6708.7,6781.7,6854.7,6942.3,7008,7084.65,7175.9,7259.85,7329.2,7383.95,7449.65,7500.75,7544.55,7581.05 "AEO 1997",,,,6635.7,6694.1,6825.5,6953.25,7073.7,7183.2,7267.15,7369.35,7460.6,7548.2,7643.1,7730.7,7792.75,7832.9,7884,7924.15

103

Table 22. Total Carbon Dioxide Emissions, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Total Carbon Dioxide Emissions, Projected vs. Actual Total Carbon Dioxide Emissions, Projected vs. Actual (million metric tons) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 AEO 1983 AEO 1984 AEO 1985 AEO 1986 AEO 1987 AEO 1989* AEO 1990 AEO 1991 AEO 1992 AEO 1993 5009 5053 5130 5207 5269 5335 5401 5449 5504 5562 5621 5672 5724 5771 5819 5867 5918 5969 AEO 1994 5060 5130 5185 5240 5287 5335 5379 5438 5482 5529 5599 5658 5694 5738 5797 5874 5925 AEO 1995 5137 5174 5188 5262 5309 5361 5394 5441.3 5489.0 5551.3 5621.0 5679.7 5727.3 5775.0 5841.0 5888.7 AEO 1996 5182 5224 5295 5355 5417 5464 5525 5589 5660 5735 5812 5879 5925 5981 6030 AEO 1997 5295 5381 5491 5586 5658 5715 5781 5863 5934 6009 6106 6184 6236 6268 AEO 1998 5474 5621 5711 5784 5893 5957 6026 6098 6192 6292 6379 6465 6542 AEO 1999 5522 5689 5810 5913 5976 6036 6084 6152 6244 6325 6418 6493 AEO 2000

104

Table 18. Total Delivered Commercial Energy Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Commercial Energy Consumption, Projected vs. Actual Total Delivered Commercial Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.4 7.5 7.5 7.5 7.5 7.6 AEO 1995 6.9 6.9 7.0 7.0 7.0 7.1 7.1 7.1 7.1 7.1 7.2 7.2 7.2 7.2 7.3 7.3 7.3 AEO 1996 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.5 7.6 7.6 7.7 7.7 7.8 7.9 8.0 8.0 8.1 AEO 1997 7.4 7.4 7.4 7.5 7.5 7.6 7.7 7.7 7.8 7.8 7.9 7.9 8.0 8.1 8.1 8.2 AEO 1998 7.5 7.6 7.7 7.8 7.9 8.0 8.0 8.1 8.2 8.3 8.4 8.4 8.5 8.6 8.7 AEO 1999 7.4 7.8 7.9 8.0 8.1 8.2 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 AEO 2000 7.7 7.8 7.9 8.0 8.1 8.2 8.3 8.4 8.5 8.5 8.7 8.7 8.8 AEO 2001 7.8 8.1 8.3 8.6 8.7 8.9 9.0 9.2 9.3 9.5 9.6 9.7 AEO 2002 8.2 8.4 8.7 8.9 9.0 9.2 9.4 9.6 9.7 9.9 10.1

105

Table 19. Total Delivered Industrial Energy Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Industrial Energy Consumption, Projected vs. Actual Total Delivered Industrial Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 25.4 25.9 26.3 26.7 27.0 27.1 26.8 26.6 26.9 27.2 27.7 28.1 28.3 28.7 29.1 29.4 29.7 30.0 AEO 1995 26.2 26.3 26.5 27.0 27.3 26.9 26.6 26.8 27.1 27.5 27.9 28.2 28.4 28.7 29.0 29.3 29.6 AEO 1996 26.5 26.6 27.3 27.5 26.9 26.5 26.7 26.9 27.2 27.6 27.9 28.2 28.3 28.5 28.7 28.9 29.2 AEO 1997 26.2 26.5 26.9 26.7 26.6 26.8 27.1 27.4 27.8 28.0 28.4 28.7 28.9 29.0 29.2 29.4 AEO 1998 27.2 27.5 27.2 26.9 27.1 27.5 27.7 27.9 28.3 28.7 29.0 29.3 29.7 29.9 30.1 AEO 1999 26.7 26.4 26.4 26.8 27.1 27.3 27.5 27.9 28.3 28.6 28.9 29.2 29.5 29.7 AEO 2000 25.8 25.5 25.7 26.0 26.5 26.9 27.4 27.8 28.1 28.3 28.5 28.8 29.0

106

Table 17. Total Delivered Residential Energy Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Residential Energy Consumption, Projected vs. Actual Total Delivered Residential Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 10.3 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.5 10.5 10.5 10.5 10.5 10.6 10.6 AEO 1995 11.0 10.8 10.8 10.8 10.8 10.8 10.8 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.8 10.8 10.9 AEO 1996 10.4 10.7 10.7 10.7 10.8 10.8 10.9 10.9 11.0 11.2 11.2 11.3 11.4 11.5 11.6 11.7 11.8 AEO 1997 11.1 10.9 11.1 11.1 11.2 11.2 11.2 11.3 11.4 11.5 11.5 11.6 11.7 11.8 11.9 12.0 AEO 1998 10.7 11.1 11.2 11.4 11.5 11.5 11.6 11.7 11.8 11.9 11.9 12.1 12.1 12.2 12.3 AEO 1999 10.5 11.1 11.3 11.3 11.4 11.5 11.5 11.6 11.6 11.7 11.8 11.9 12.0 12.1 AEO 2000 10.7 10.9 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 12.0

107

Table 20. Total Delivered Transportation Energy Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Transportation Energy Consumption, Projected vs. Actual Total Delivered Transportation Energy Consumption, Projected vs. Actual Projected (quadrillion Btu) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 23.6 24.1 24.5 24.7 25.1 25.4 25.7 26.2 26.5 26.9 27.2 27.6 27.9 28.3 28.6 28.9 29.2 29.5 AEO 1995 23.3 24.0 24.2 24.7 25.1 25.5 25.9 26.2 26.5 26.9 27.3 27.7 28.0 28.3 28.5 28.7 28.9 AEO 1996 23.9 24.1 24.5 24.8 25.3 25.7 26.0 26.4 26.7 27.1 27.5 27.8 28.1 28.4 28.6 28.9 29.1 AEO 1997 24.7 25.3 25.9 26.4 27.0 27.5 28.0 28.5 28.9 29.4 29.8 30.3 30.6 30.9 31.1 31.3 AEO 1998 25.3 25.9 26.7 27.1 27.7 28.3 28.8 29.4 30.0 30.6 31.2 31.7 32.3 32.8 33.1 AEO 1999 25.4 26.0 27.0 27.6 28.2 28.8 29.4 30.0 30.6 31.2 31.7 32.2 32.8 33.1 AEO 2000 26.2 26.8 27.4 28.0 28.5 29.1 29.7 30.3 30.9 31.4 31.9 32.5 32.9

108

Table 8. Total Natural Gas Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Total Natural Gas Consumption, Projected vs. Actual Total Natural Gas Consumption, Projected vs. Actual Projected (trillion cubic feet) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 19.87 20.21 20.64 20.99 21.20 21.42 21.60 21.99 22.37 22.63 22.95 23.22 23.58 23.82 24.09 24.13 24.02 24.14 AEO 1995 20.82 20.66 20.85 21.21 21.65 21.95 22.12 22.25 22.43 22.62 22.87 23.08 23.36 23.61 24.08 24.23 24.59 AEO 1996 21.32 21.64 22.11 22.21 22.26 22.34 22.46 22.74 23.14 23.63 24.08 24.25 24.63 25.11 25.56 26.00 26.63 AEO 1997 22.15 22.75 23.24 23.64 23.86 24.13 24.65 25.34 25.82 26.22 26.52 27.00 27.35 27.70 28.01 28.47 AEO 1998 21.84 23.03 23.84 24.08 24.44 24.81 25.33 25.72 26.22 26.65 27.22 27.84 28.35 28.84 29.17 AEO 1999 21.35 22.36 22.54 23.18 23.65 24.17 24.57 25.19 25.77 26.41 26.92 27.42 28.02 28.50

109

Texas Tech University Energy Savings Program FY 2014 Update  

E-Print Network [OSTI]

, we experienced a net increase in energy costs for FY14 of $93,300, even though total energy use has energy consumption for the prior fiscal year. Through FY14, the campus consumed 153.04 kbtu/ft2 `13 ­ August `14 FY13 Gallons Consumed FY14 Goal (5% Decline) FY14 Gallons Consumed Percent Change 1st

Zhuang, Yu

110

Contract/Project Management  

Energy Savers [EERE]

1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

111

AEO2013 Early Release Base Overnight Project Technological Total Overnight  

U.S. Energy Information Administration (EIA) Indexed Site

AEO2013 Early Release AEO2013 Early Release Base Overnight Project Technological Total Overnight Variable Fixed Heatrate 6 nth-of-a- kind Online Size Lead time Cost in 2012 Contingency Optimism Cost in 2012 4 O&M 5 O&M in 2012 Heatrate Technology Year 1 (MW) (years) (2011 $/kW) Factor 2 Factor 3 (2011 $/kW) (2011 $/MWh) (2011$/kW) (Btu/kWh) (Btu/kWh) Scrubbed Coal New 7 2016 1300 4 2,694 1.07 1.00 2,883 4.39 30.64 8,800 8,740 Integrated Coal-Gasification Comb Cycle (IGCC) 7 2016 1200 4 3,475 1.07 1.00 3,718 7.09 50.49 8,700 7,450 Pulverized Coal with carbon sequestration 2017 650 4 4,662 1.07 1.03 5,138 4.37 65.31 12,000 9,316

112

FY 2006 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Discretionary Summary By Appropriation Energy And Water Development Appropriation Summary: Energy Programs Energy supply Operation and maintenance................................................. 787,941 909,903 862,499 -47,404 -5.2% Construction......................................................................... 6,956 22,416 40,175 17,759 +79.2% Total, Energy supply................................................................ 794,897 932,319 902,674 -29,645 -3.2% Non-Defense site acceleration completion............................. 167,272 157,316 172,400 15,084 +9.6%

113

Project Listings by State; DOE Hydrogen Program FY 2008 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 FY 2008 Annual Progress Report DOE Hydrogen Program Alabama IV.B.1i University of Alabama: Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .592 V.H.1 CFD Research Corporation: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033 V.H.1 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1033 Alaska II.C.3 University of Alaska: Development of a Novel Efficient Solid-Oxide Hybrid for Co-Generation of Hydrogen and Electricity Using Nearby Resources for Local Application .

114

Project Listings by Organization, DOE Hydrogen Program FY 2010 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

33 33 FY 2010 Annual Progress Report DOE Hydrogen Program 3M Company V.D.2 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .748 V.D.7 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .772 V.E.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .790 V.E.6 Durable Catalysts for Fuel Cell Protection during Transient Conditions. . . . . . . . . . . . . . . . . . . . . . . . .825 V.E.8 Nanosegregated Cathode Alloy Catalysts with Ultra-Low Platinum Loading. . . . . . . . . . . . . . . . . . . . .835

115

Project Listings by Organization; DOE Hydrogen Program FY 2008 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2008 Annual Progress Report DOE Hydrogen Program 3M Company V.C.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .861 V.G.5 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .962 V.G.8 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 978 A Mountain Top, LLC X.8 HyDRA: Hydrogen Demand and Resource Analysis Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1275 Addison Bain VIII.6 Hydrogen Safety Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1202

116

Project Listings by Organization; DOE Hydrogen Program FY 2009 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2009 Annual Progress Report DOE Hydrogen Program 3M Company V.D.11 Novel Approaches to Immobilized Heteropoly Acid (HPA) Systems for High Temperature, Low Relative Humidity Polymer-Type Membranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1034 V.D.13 Membranes and MEAs for Dry, Hot Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1042 V.E.1 Advanced Cathode Catalysts and Supports for PEM Fuel Cells. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1065 A Mountaintop LLC VII.1 HyDRA: Hydrogen Demand and Resource Analysis Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1267 Acumentrics Corporation V.I.5 Development of a Low Cost 3-10 kW Tubular SOFC Power System . . . . . . . . . . . . . . . . . . . . . . . . . . 1141 Addison Bain IX.7 Hydrogen Safety Panel

117

Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report  

SciTech Connect (OSTI)

Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.

R. Johansen

2011-09-01T23:59:59.000Z

118

Developing a total replacement cost index for suburban office projects  

E-Print Network [OSTI]

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

119

Table 12. Total Coal Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Consumption, Projected vs. Actual" Coal Consumption, Projected vs. Actual" "Projected" " (million short tons)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",920,928,933,938,943,948,953,958,962,967,978,990,987,992,1006,1035,1061,1079 "AEO 1995",,935,940,941,947,948,951,954,958,963,971,984,992,996,1002,1013,1025,1039 "AEO 1996",,,937,942,954,962,983,990,1004,1017,1027,1033,1046,1067,1070,1071,1074,1082,1087 "AEO 1997",,,,948,970,987,1003,1017,1020,1025,1034,1041,1054,1075,1086,1092,1092,1099,1104 "AEO 1998",,,,,1009,1051,1043.875977,1058.292725,1086.598145,1084.446655,1089.787109,1096.931763,1111.523926,1129.833862,1142.338257,1148.019409,1159.695312,1162.210815,1180.029785

120

Table 4. Total Petroleum Consumption, Projected vs. Actual  

U.S. Energy Information Administration (EIA) Indexed Site

Petroleum Consumption, Projected vs. Actual Petroleum Consumption, Projected vs. Actual Projected (million barrels) 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 AEO 1994 6450 6566 6643 6723 6811 6880 6957 7059 7125 7205 7296 7377 7446 7523 7596 7665 7712 7775 AEO 1995 6398 6544 6555 6676 6745 6822 6888 6964 7048 7147 7245 7337 7406 7472 7537 7581 7621 AEO 1996 6490 6526 6607 6709 6782 6855 6942 7008 7085 7176 7260 7329 7384 7450 7501 7545 7581 AEO 1997 6636 6694 6826 6953 7074 7183 7267 7369 7461 7548 7643 7731 7793 7833 7884 7924 AEO 1998 6895 6906 7066 7161 7278 7400 7488 7597 7719 7859 7959 8074 8190 8286 8361 AEO 1999 6884 7007 7269 7383 7472 7539 7620 7725 7841 7949 8069 8174 8283 8351 AEO 2000 7056 7141 7266 7363 7452 7578 7694 7815 7926 8028 8113 8217 8288

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The Multi-Isotope Process Monitor Project: FY11 Progress and Accomplishments  

SciTech Connect (OSTI)

Summary The Multi-Isotope Process (MIP) Monitor represents a potentially new and efficient approach to monitoring process conditions in reprocessing facilities with the high-level goal of aiding in the “...(minimization of) the risks of nuclear proliferation and terrorism” (Office of Technology Assessment 1995). This approach relies on multivariate analysis and gamma spectroscopy of spent fuel product and waste streams to automatically and simultaneously monitor a variety of process conditions (e.g., acid concentrations, burnup, cooling time, etc.) in near real-time (NRT). While the conceptual basis for the MIP Monitor has been shown to be effective in an aqueous reprocessing system, the fundamental approach should also be viable in a pyro-processing recycle system. The MIP Monitor may be calibrated to provide online quantitative information about process variables for process control or domestic safeguards applications; or it can simply monitor, with a built-in information barrier, for off-normal conditions in process streams, making the approach well-suited for applications were it is necessary to respect proprietary information or for international safeguards applications. Proof-of-concept simulations and experiments were performed in previous years demonstrating the validity of this tool in a laboratory setting. This report details follow-on research and development efforts sponsored by the U.S. Department of Energy Fuel Cycle Research and Development (FCR&D) related to the MIP Monitor for fiscal year 2011 (FY11).

Orton, Christopher R.; Fraga, Carlos G.; Hayes, John W.; Schwantes, Jon M.; Bender, Sarah E.; Unlu, Kenan; Dayman, Kenneth J.; Schreiber, S. S.; Landsberger, Sheldon

2012-08-01T23:59:59.000Z

122

Development of gridded mobile source emission estimates for the Houston-Galveston nonattainment counties FY93, FY96, FY99, and FY07 in support of the Coast project. Interim research report, April 1992-September 1995  

SciTech Connect (OSTI)

This report documents the methodology used to develop the Houston-Galveston Nonattainment Counties gridded mobile source emissions inventories. Included in the report are an overview of the emission estimation methodology and the 24-hour traffic assignments used in the analyses; the methods used to estimate the seasonally adjusted time-of-day vehicle miles of travel and associated operating speeds; the estimation of the emission rates using the EPA`s MOBILE5a program; and an outline of the method used to develop the emission estimates using the MOBILE5a emission rates. These emission inventories were developed in support of the Coastal Oxidant Assessment of Southeast Texas Project (COAST), a large-scale study of ozone formation being conducted by the Texas Natural Resource Conservation Commission (TNRCC).

Knowles, W.E.; Dresser, G.B.

1995-09-01T23:59:59.000Z

123

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Beacon Power Beacon Power Corporation Smart Grid Demonstration Project Tyngsboro Massachusetts City of Painesville Smart Grid Demonstration Project City of Painesville Smart Grid Demonstration Project Painesville Ohio Duke Energy Business Services LLC Smart Grid Demonstration Project Duke Energy Business Services LLC Smart Grid Demonstration Project Charlotte North Carolina East Penn Manufacturing Co Smart Grid Demonstration Project East Penn Manufacturing Co Smart Grid Demonstration Project Lyon Station Pennsylvania Ktech Corporation Smart Grid Demonstration Project Ktech Corporation Smart Grid Demonstration Project Albuquerque New Mexico New York State Electric Gas Corporation Smart Grid Demonstration Project New York State Electric Gas Corporation Smart Grid Demonstration Project

124

Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report  

SciTech Connect (OSTI)

The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

Will Lewis, Compiler

2006-09-01T23:59:59.000Z

125

The Multi-Isotope Process (MIP) Monitor Project: FY12 Progress and Accomplishments  

SciTech Connect (OSTI)

The Multi-Isotope Process (MIP) Monitor, being developed at Pacific Northwest National Laboratory (PNNL), provides an efficient approach to monitoring the process conditions in reprocessing facilities in support of the goal of "...(minimization of) the risks of nuclear proliferation and terrorism." The MIP Monitor measures distributions of a suite of indicator (radioactive) isotopes present within product and waste streams of a nuclear reprocessing facility. These indicator isotopes are monitored on-line by gamma spectrometry and compared, in near-real-time, to spectral patterns representing "normal" process conditions using multivariate pattern recognition software. The monitor utilizes this multivariate analysis and gamma spectroscopy of reprocessing streams to detect small changes in the gamma spectrum, which may indicate changes in process conditions. Multivariate analysis methods common in chemometrics, such as principal component analysis (PCA) and partial least squares regression (PLS), act as pattern recognition techniques, which can detect small deviations from the expected, nominal condition. By targeting multiple gamma-emitting indicator isotopes, the MIP Monitor approach is compatible with the use of small, portable, relatively high-resolution gamma detectors that may be easily deployed throughout an existing facility. The automated multivariate analysis can provide a level of data obscurity, giving a built-in information barrier to protect sensitive or proprietary operational data. Proof-of-concept simulations and experiments have been performed in previous years to demonstrate the validity of this tool in a laboratory setting. Development of the MIP Monitor approach continues to evaluate the efficacy of the monitor for automated, real-time or near-real-time application. This report details follow-on research and development efforts sponsored by the U.S. Department of Energy Fuel Cycle Research and Development related to the MIP Monitor for fiscal year 2012 (FY12).

Coble, Jamie B.; Orton, Christopher R.; Jordan, David V.; Schwantes, Jon M.; Bender, Sarah; Dayman, Kenneth J.; Unlu, Kenan; Landsberger, Sheldon

2012-09-27T23:59:59.000Z

126

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Electric Company Smart Grid Project Atlantic City Electric Electric Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Mays Landing New Jersey Maryland District of Columbia Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Spokane Washington Idaho Consolidated Edison Company of New York Inc Smart Grid Project Consolidated Edison Company of New York Inc Smart Grid Project New York New York New Jersey El Paso Electric Smart Grid Project El Paso Electric Smart Grid Project El Paso Texas New Mexico Hawaii Electric Co Inc Smart Grid Project Hawaii Electric Co Inc Smart Grid Project Oahu Hawaii Memphis Light Gas and Water Division Smart Grid Project Memphis Light Gas and Water Division Smart Grid Project Memphis Tennessee Municipal Electric Authority of Georgia Smart Grid Project Municipal

127

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Baltimore Gas Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid Project Houston Texas Central Maine Power Company Smart Grid Project Central Maine Power Company Smart Grid Project Augusta Maine Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Wyoming City of Fulton Missouri Smart Grid Project City of Fulton Missouri

128

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Burbank Water and Power Burbank Water and Power Smart Grid Project Burbank California Central Lincoln People s Utility District Smart Grid Project Central Lincoln People s Utility District Smart Grid Project Newport Oregon City of Anaheim Smart Grid Project City of Anaheim Smart Grid Project Anaheim California City of Auburn IN Smart Grid Project City of Auburn IN Smart Grid Project Auburn Indiana City of Fort Collins Utilities Smart Grid Project City of Fort Collins Utilities Smart Grid Project Fort Collins Colorado City of Leesburg Florida Smart Grid Project City of Leesburg Florida Smart Grid Project Leesburg Florida City of Naperville Illinois Smart Grid Project City of Naperville Illinois Smart Grid Project Naperville Illinois City of Wadsworth OH Smart Grid Project City of Wadsworth OH Smart

129

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Mays Landing New Jersey Maryland District of Columbia Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Spokane Washington Idaho Baltimore Gas and Electric Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado Burbank Water and Power Smart Grid Project Burbank Water and Power Smart Grid Project Burbank California CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid

130

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Battelle Memorial Institute Pacific Northwest Division Smart Grid Demonstration Battelle Memorial Institute Pacific Northwest Division Smart Grid Demonstration Project Battelle Memorial Institute Pacific Northwest Division Smart Grid Demonstration Project Richland Washington Beacon Power Corporation Smart Grid Demonstration Project Beacon Power Corporation Smart Grid Demonstration Project Tyngsboro Massachusetts Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Austin Texas City of Painesville Smart Grid Demonstration Project City of Painesville Smart Grid Demonstration Project Painesville Ohio Columbus Southern Power Company doing business as AEP Ohio Smart Grid Demonstration Project Columbus Southern Power Company doing business

131

Photovoltaic Program Branch annual report, FY 1989  

SciTech Connect (OSTI)

This report summarizes the progress of the Photovoltaic (PV) Program Branch of the Solar Energy Research Institute (SERI) from October 1, 1988, through September 30, 1989. The branch is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year (FY) 1989, this included nearly 50 subcontracts, with a total annualized funding of approximately $13.1 million. Approximately two-thirds of the subcontracts were with universities, at a total funding of nearly $4 million. The six technical sections of the report cover the main areas of the subcontracted program: Amorphous Silicon Research, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, New Ideas, and University Participation. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1989, and future research directions. Each report will be cataloged individually.

Summers, K A [ed.

1990-03-01T23:59:59.000Z

132

Table 16. Total Electricity Sales, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Electricity Sales, Projected vs. Actual Electricity Sales, Projected vs. Actual (billion kilowatt-hours) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 2364 2454 2534 2626 2708 2811 AEO 1983 2318 2395 2476 2565 2650 2739 3153 AEO 1984 2321 2376 2461 2551 2637 2738 3182 AEO 1985 2317 2360 2427 2491 2570 2651 2730 2808 2879 2949 3026 AEO 1986 2363 2416 2479 2533 2608 2706 2798 2883 2966 3048 3116 3185 3255 3324 3397 AEO 1987 2460 2494 2555 2622 2683 2748 2823 2902 2977 3363 AEO 1989* 2556 2619 2689 2760 2835 2917 2994 3072 3156 3236 3313 3394 3473 AEO 1990 2612 2689 3083 3488.0 3870.0 AEO 1991 2700 2762 2806 2855 2904 2959 3022 3088 3151 3214 3282 3355 3427 3496 3563 3632 3704 3776 3846 3916 AEO 1992 2746 2845 2858 2913 2975 3030 3087 3146 3209 3276 3345 3415 3483 3552 3625 3699 3774 3847 3921 AEO 1993 2803 2840 2893 2946 2998 3052 3104 3157 3214 3271 3327

133

L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report  

SciTech Connect (OSTI)

This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

Durham, Robin E.; Sackschewsky, Michael R.

2008-09-30T23:59:59.000Z

134

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Carolinas LLC Smart Grid Project Duke Energy Carolinas Carolinas LLC Smart Grid Project Duke Energy Carolinas LLC Smart Grid Project Charlotte North Carolina Entergy Services Inc Smart Grid Project Entergy Services Inc Smart Grid Project New Orleans Louisiana ISO New England Incorporated Smart Grid Project ISO New England Incorporated Smart Grid Project Holyoke Massachusetts Connecticut Maine New Hampshire Rhode Island Vermont Midwest Energy Inc Smart Grid Project Midwest Energy Inc Smart Grid Project Hays Kansas Midwest Independent Transmission System Operator Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project Carmel Indiana Iowa Illinois Michigan Minnesota Missouri Montana North Dakota Ohio Pennsylvania South Dakota Wisconsin New York Independent System Operator Inc Smart Grid Project New York

135

Yucca Mountain project : FY 2006 annual report for waste form testingactivities.  

SciTech Connect (OSTI)

This report describes the experimental work performed at Argonne National Laboratory (Argonne) during fiscal year (FY 2006) under the Bechtel SAIC Company, LLC (BSC) Memorandum Purchase Order (MPO) contract number B004210CM3X. Because this experimental work is focused on the dissolution and precipitation behavior of neptunium, the report also includes, or incorporates by reference, earlier results that are relevant to presenting a more complete understanding of the likely behavior of neptunium under experimental conditions relevant to the Yucca Mountain repository. Important results relevant to the technical bases, validations, and conservatisms in current source term models are summarized. The CSNF samples were observed to corrode following the general contour of the surface rather than via (for instance) grain boundary attack. This supports the current approach of estimating the effective surface area of corroding CSNF based on the geometric surface area of fuel pellet fragments. It was observed that the neptunium and plutonium concentrations in corroded CSNF samples were somewhat higher at and near the corrosion front (i.e., at the interface between the alteration product ''rind'' layer and the underlying fuel) than in the bulk fuel. The neptunium and plutonium at the corrosion front and in the uranyl alteration layer were found to be in the quadravalent (4+) oxidation state. The uranyl phases that constitute most of the alteration rind were depleted in neptunium relative to the bulk fuel: neptunium concentrations in the uranyl alteration rind were less than 20% of that in the parent fuel. Homogeneous precipitation tests have shown that solids precipitate from a 1 x 10{sup -4} M Np(V) solution over the temperature range of 200-280 C, but no evidence was found that any solids precipitated from the same solution at 150 C through 289 days. The solids formed in the homogeneous precipitation tests were predominantly a Np(IV)-bearing phase, probably NpO{sub 2}. The presence of UO{sub 2} resulted in the rapid precipitation at room temperature of similar amounts of Np(IV)- and Np(V)-bearing phases, probably NpO{sub 2} and Np{sub 2}O{sub 5}. Although the UO{sub 2} is presumed to act as a reducing agent for Np(V) that leads to the precipitation of a Np(IV)-bearing phase, the observed formation of a Np(V)-bearing phase suggests that the UO{sub 2} also catalyzes Np{sub 2}O5 precipitation under these test conditions.

Ebert, W. L.; Fortner, J. A.; Guelis, A. V.; Cunnane, J. C.

2006-11-01T23:59:59.000Z

136

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Management Secondary Performance Metrics FY 2010 Target FY 2010 Actual Comment 4. PDRI Use: By the end of FY11, 80% of projects (>100M) will use PDRI methodologies no later...

137

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Project Center for the Commercialization of Electric Project Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Austin Texas Columbus Southern Power Company doing business as AEP Ohio Smart Grid Demonstration Project Columbus Southern Power Company doing business as AEP Ohio Smart Grid Demonstration Project Columbus Ohio Consolidated Edison Company of New York Inc Smart Grid Demonstration Project Consolidated Edison Company of New York Inc Smart Grid Demonstration Project New York New York Kansas City Power Light Company Smart Grid Demonstration Project Kansas City Power Light Company Smart Grid Demonstration Project Kansas City Missouri Long Island Power Authority Smart Grid Demonstration Project Long Island Power Authority Smart Grid Demonstration Project Uniondale New York

138

Table 21. Total Transportation Energy Consumption, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Transportation Energy Consumption, Projected vs. Actual Transportation Energy Consumption, Projected vs. Actual (quadrillion Btu) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 18.6 18.2 17.7 17.3 17.0 16.9 AEO 1983 19.8 20.1 20.4 20.4 20.5 20.5 20.7 AEO 1984 19.2 19.0 19.0 19.0 19.1 19.2 20.1 AEO 1985 20.0 19.8 20.0 20.0 20.0 20.1 20.3 AEO 1986 20.5 20.8 20.8 20.6 20.7 20.3 21.0 AEO 1987 21.3 21.5 21.6 21.7 21.8 22.0 22.0 22.0 21.9 22.3 AEO 1989* 21.8 22.2 22.4 22.4 22.5 22.5 22.5 22.5 22.6 22.7 22.8 23.0 23.2 AEO 1990 22.0 22.4 23.2 24.3 25.5 AEO 1991 22.1 21.6 21.9 22.1 22.3 22.5 22.8 23.1 23.4 23.8 24.1 24.5 24.8 25.1 25.4 25.7 26.0 26.3 26.6 26.9 AEO 1992 21.7 22.0 22.5 22.9 23.2 23.4 23.6 23.9 24.1 24.4 24.8 25.1 25.4 25.7 26.0 26.3 26.6 26.9 27.1 AEO 1993 22.5 22.8 23.4 23.9 24.3 24.7 25.1 25.4 25.7 26.1 26.5 26.8 27.2 27.6 27.9 28.1 28.4 28.7 AEO 1994 23.6

139

Table 17. Total Energy Consumption, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Energy Consumption, Projected vs. Actual Energy Consumption, Projected vs. Actual (quadrillion Btu) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 79.1 79.6 79.9 80.8 82.1 83.3 AEO 1983 78.0 79.5 81.0 82.4 83.9 84.6 89.0 AEO 1984 78.5 79.4 81.2 83.1 85.1 86.4 93.0 AEO 1985 77.6 78.5 79.8 81.2 82.7 83.3 84.2 85.0 85.7 86.3 87.2 AEO 1986 77.0 78.8 79.8 80.7 81.5 82.9 83.8 84.6 85.3 86.0 86.6 87.4 88.3 89.4 90.2 AEO 1987 78.9 80.0 82.0 82.8 83.9 85.1 86.2 87.1 87.9 92.5 AEO 1989* 82.2 83.8 84.5 85.4 86.2 87.1 87.8 88.7 89.5 90.4 91.4 92.4 93.5 AEO 1990 84.2 85.4 91.9 97.4 102.8 AEO 1991 84.4 85.0 86.0 87.0 87.9 89.1 90.4 91.8 93.1 94.3 95.6 97.1 98.4 99.4 100.3 101.4 102.5 103.6 104.7 105.8 AEO 1992 84.7 87.0 88.0 89.2 90.5 91.4 92.4 93.4 94.5 95.6 96.9 98.0 99.0 100.0 101.2 102.2 103.2 104.3 105.2 AEO 1993 87.0 88.3 89.8 91.4 92.7 94.0 95.3 96.3 97.5 98.6

140

Table 20. Total Industrial Energy Consumption, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Industrial Energy Consumption, Projected vs. Actual Industrial Energy Consumption, Projected vs. Actual (quadrillion Btu) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 24.0 24.1 24.4 24.9 25.5 26.1 AEO 1983 23.2 23.6 23.9 24.4 24.9 25.0 25.4 AEO 1984 24.1 24.5 25.4 25.5 27.1 27.4 28.7 AEO 1985 23.2 23.6 23.9 24.4 24.8 24.8 24.4 AEO 1986 22.2 22.8 23.1 23.4 23.4 23.6 22.8 AEO 1987 22.4 22.8 23.7 24.0 24.3 24.6 24.6 24.7 24.9 22.6 AEO 1989* 23.6 24.0 24.1 24.3 24.5 24.3 24.3 24.5 24.6 24.8 24.9 24.4 24.1 AEO 1990 25.0 25.4 27.1 27.3 28.6 AEO 1991 24.6 24.5 24.8 24.8 25.0 25.3 25.7 26.2 26.5 26.1 25.9 26.2 26.4 26.6 26.7 27.0 27.2 27.4 27.7 28.0 AEO 1992 24.6 25.3 25.4 25.6 26.1 26.3 26.5 26.5 26.0 25.6 25.8 26.0 26.1 26.2 26.4 26.7 26.9 27.2 27.3 AEO 1993 25.5 25.9 26.2 26.8 27.1 27.5 27.8 27.4 27.1 27.4 27.6 27.8 28.0 28.2 28.4 28.7 28.9 29.1 AEO 1994 25.4 25.9

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Table 18. Total Residential Energy Consumption, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Residential Energy Consumption, Projected vs. Actual Residential Energy Consumption, Projected vs. Actual (quadrillion Btu) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 10.1 10.1 10.1 10.1 10.2 10.2 AEO 1983 9.8 9.9 10.0 10.1 10.2 10.1 10.0 AEO 1984 9.9 9.9 10.0 10.2 10.3 10.3 10.5 AEO 1985 9.8 10.0 10.1 10.3 10.6 10.6 10.9 AEO 1986 9.6 9.8 10.0 10.3 10.4 10.8 10.9 AEO 1987 9.9 10.2 10.3 10.3 10.4 10.5 10.5 10.5 10.5 10.6 AEO 1989* 10.3 10.5 10.4 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 AEO 1990 10.4 10.7 10.8 11.0 11.3 AEO 1991 10.2 10.7 10.7 10.8 10.8 10.8 10.9 10.9 10.9 11.0 11.0 11.0 11.1 11.2 11.2 11.3 11.4 11.4 11.5 11.6 AEO 1992 10.6 11.1 11.1 11.1 11.1 11.1 11.2 11.2 11.3 11.3 11.4 11.5 11.5 11.6 11.7 11.8 11.8 11.9 12.0 AEO 1993 10.7 10.9 11.0 11.0 11.0 11.1 11.1 11.1 11.1 11.2 11.2 11.2 11.2 11.3 11.3 11.4 11.4 11.5 AEO 1994 10.3 10.4 10.4 10.4

142

Microsoft Word - CX-LanePhaseSeparationProjects_FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Michael Marleau - TEP-TPP-1 Project Manager Proposed Action: Lane Substation 500/230-kV Transformer Phase Separation Project Project Work Order Number: 00298187 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities Location: Lane Substation, Lane County, Oregon Township 17 South, Range 5 East, Section 36 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to increase the physical distance that separates each phase of the 500/230-kiloVolt transformer banks at BPA's Lane Substation. The reason for the increased distance is to minimize the effects of a transformer fire or explosion as

143

NREL/SCE High Penetration PV Integration Project: FY13 Annual Report  

SciTech Connect (OSTI)

In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

Mather, B. A.; Shah, S.; Norris, B. L.; Dise, J. H.; Yu, L.; Paradis, D.; Katiraei, F.; Seguin, R.; Costyk, D.; Woyak, J.; Jung, J.; Russell, K.; Broadwater, R.

2014-06-01T23:59:59.000Z

144

Table 19. Total Commercial Energy Consumption, Projected vs. Actual  

Gasoline and Diesel Fuel Update (EIA)

Commercial Energy Consumption, Projected vs. Actual Commercial Energy Consumption, Projected vs. Actual (quadrillion Btu) 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 AEO 1982 6.6 6.7 6.8 6.8 6.8 6.9 AEO 1983 6.4 6.6 6.8 6.9 7.0 7.1 7.2 AEO 1984 6.2 6.4 6.5 6.7 6.8 6.9 7.3 AEO 1985 5.9 6.1 6.2 6.3 6.4 6.5 6.7 AEO 1986 6.2 6.3 6.4 6.4 6.5 7.1 7.4 AEO 1987 6.1 6.1 6.3 6.4 6.6 6.7 6.8 6.9 6.9 7.3 AEO 1989* 6.6 6.7 6.9 7.0 7.0 7.1 7.2 7.3 7.3 7.4 7.5 7.6 7.7 AEO 1990 6.6 6.8 7.1 7.4 7.8 AEO 1991 6.7 6.9 7.0 7.1 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.1 8.2 8.3 8.4 8.6 8.7 AEO 1992 6.8 7.1 7.2 7.3 7.3 7.4 7.5 7.6 7.7 7.8 7.9 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 AEO 1993 7.2 7.3 7.4 7.4 7.5 7.6 7.7 7.7 7.8 7.9 7.9 8.0 8.0 8.1 8.1 8.1 8.2 8.2 AEO 1994 6.8 6.9 6.9 7.0 7.1 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.4 7.5 7.5 7.5 7.5 AEO 1995 6.94 6.9 7.0 7.0 7.0 7.1 7.1 7.1 7.1 7.1 7.2 7.2 7.2 7.2 7.3 7.3 AEO 1996 7.1 7.2 7.2 7.3 7.3 7.4 7.4 7.5 7.6 7.6 7.7 7.7 7.8 7.9 8.0

145

FEDMAP FY 2011 Projects 3D/4D Mapping of the San Andreas Fault Zone (Graymer)  

E-Print Network [OSTI]

of surface and groundwater sustainability, land-use planning, ecosystem health, climate change, and sea level Basin and Range Province. Location: Nevada Strategic Direction: Energy and Minerals, Natural Hazards: Colorado, New Mexico Website: http://crustal.cr.usgs.gov/projects/rgb Strategic Direction: Water Issues

146

Fire protection research for energy technology projects; FY 79 year-end report  

SciTech Connect (OSTI)

This report describes work performed in fiscal year 1979, on a DOE funded study entitled Fire Protection Research for Energy Technology Projects. The primary goal of this program is to ensure that fire protection measures for Fusion Energy Experiments (FEE) evolve concurrently with the complexity of FEE. Ultimately, it is planned that the detailed study of fusion experiments will provide an analytical methodology which can be applied to the full range of energy technology projects. We attempt to achieve this objective by coordinately advancing 3 (three) major task areas; (a) determine the fire hazards of current FEE facilities (b) assess the ability of accepted fire management strategies to meet and negate the hazard, (c) perform unique research into problem areas we have identified to provide input into analytical fire growth and damage assessment models.

Hasegawa, H.K.; Alvares, N.J.; Lipska, A.E.; Ford, H.; Beason, D.G.

1981-01-01T23:59:59.000Z

147

Nevada Test Site-Directed Research and Development: FY 2006 Report  

SciTech Connect (OSTI)

The Nevada Test Site–Directed Research and Development (SDRD) program completed its fifth successful year of research and development activities in FY 2006. Forty new projects were selected for funding this year, and ten FY 2005 projects were brought to conclusion. The total funds expended by the SDRD program were $6 million, for an average per-project cost of $120 thousand. Beginning in May, 2006 programmatic burden rates were applied to SDRD project costs. An external audit conducted in September 2006 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: the filing of 27 invention disclosures for intellectual property generated by FY 2006 projects; programmatic adoption of four FY 2005 SDRD-developed technologies; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2006 projects; and the successful completion of 50 R&D projects, as presented in this report.

Wil Lewis, editor

2007-08-01T23:59:59.000Z

148

Project Impact Assessments: Building America FY14 Field Test Technical Support- 2014 BTO Peer Review  

Broader source: Energy.gov [DOE]

Presenter: Lieko Earle, National Renewable Energy Laboratory The goal of this project is for the National Renewable Energy Laboratory to provide extensive, hands-on technical support to Building America teams in the areas of experiment design, provision of research-grade measurement hardware, energy modeling, and analysis. Building America’s field tests—regularly conducted by both Building America teams and national laboratories—demonstrate the program’s best house system innovations. The tests enable cost-effective evaluation of real-world performance and help ensure that all Building America field tests result in high-impact findings that push builders and homeowners to higher levels of savings.

149

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

150

Staff Recommendations for Remaining Projects in the RME/AP Category Review 5/18/2011 # Task1 SubCat ProjNum Title Sponsor ISRPRec BiOp Accord FY12Req BPA  

E-Print Network [OSTI]

199506425 Policy, Plan and Technical Support of Washington Department of Fish and Wildlife (WDFW)-Yakima/Klickitat Fisheries Project (YKFP) Washington Department of Fish and Wildlife (WDFW) Yes (Qualified) $197,917 Art 2012; project to wind down for close out within FY 2012. 102 B AP 200203100 Growth Modulation in Salmon

151

Total  

Gasoline and Diesel Fuel Update (EIA)

Total Total .............. 16,164,874 5,967,376 22,132,249 2,972,552 280,370 167,519 18,711,808 1993 Total .............. 16,691,139 6,034,504 22,725,642 3,103,014 413,971 226,743 18,981,915 1994 Total .............. 17,351,060 6,229,645 23,580,706 3,230,667 412,178 228,336 19,709,525 1995 Total .............. 17,282,032 6,461,596 23,743,628 3,565,023 388,392 283,739 19,506,474 1996 Total .............. 17,680,777 6,370,888 24,051,665 3,510,330 518,425 272,117 19,750,793 Alabama Total......... 570,907 11,394 582,301 22,601 27,006 1,853 530,841 Onshore ................ 209,839 11,394 221,233 22,601 16,762 1,593 180,277 State Offshore....... 209,013 0 209,013 0 10,244 260 198,509 Federal Offshore... 152,055 0 152,055 0 0 0 152,055 Alaska Total ............ 183,747 3,189,837 3,373,584 2,885,686 0 7,070 480,828 Onshore ................ 64,751 3,182,782

152

Microsoft Word - CX-OTEC-West-JohnDaySub-MeterProjectFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Walker Miller Walker Miller Electrical Engineer - TPCF-PASCO Proposed Action: Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation PP&A Project No: 2595 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an old JEM1 revenue meter at OTEC's West John Day Substation. The meter would be replaced with a new JEMStar meter inside OTEC's existing control house. The new meter would allow BPA to meter load from a new transformer OTEC is installing. This meter will be installed by BPA personnel and it will remain the property and responsibility of BPA.

153

Microsoft Word - CX-BentonCoPUD-FinleySubstationMeterProject_FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

John Roeder John Roeder Contractor - TEP-CSB-1 Proposed Action: Revenue Meter Replacement at Benton County Public Utility District's (PUD) Finley Substation PP&A Project No: 2594 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace an existing JEM1 revenue meter with a new JEMStar revenue meter within an existing meter rack at Benton County PUD's Finley Substation. BPA would own the rack and meter. No ground disturbance or alteration to the meter house would occur. Findings: BPA has determined that the proposed action complies with Section 1021.410 and

154

DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic  

Broader source: Energy.gov (indexed) [DOE]

Totaling $12.4 Million Aimed at Increasing Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection August 1, 2011 - 1:00pm Addthis Washington, DC - A total of 11 research projects that will help find ways to extract more energy from unconventional oil and gas resources while reducing environmental risks have been selected totaling $12.4 million by the U.S. Department of Energy's (DOE) Office of Fossil Energy (FE). The selections include $10.3 million for eight projects that will reduce the environmental risks of shale gas development while accelerating the application of new exploration and production technologies; and $2.1

155

FY 2011 OCIO Congressional Budget  

Broader source: Energy.gov (indexed) [DOE]

Departmental Administration/ Departmental Administration/ Chief Information Officer/ FY 2011 Congressional Budget Chief Information Officer Funding Profile by Subprogram (dollars in thousands) FY 2009 Current Appropriati on FY 2009 Current Recovery Act Appropriatio n FY 2010 Current Appropriation FY 2011 Request Chief Information Officer Cyber Security 34,512 0 33,365 35,872 Corporate Management Information Program 27,250 0 9,403 8,933 Energy Information Technology Services 0 0 22,149 21,120 Program Direction 53,738 5,700 38,146 36,238 Total, Chief Information Officer 115,500 5,700 103,063 102,163 Public Law Authorizations: Public Law 103-62: 'Government Performance Results Act of 1993' Public Law 104-106: 'Clinger-Cohen Act of 1996'

156

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

157

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

158

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

159

Yucca Mountain Project - Argonne National Laboratory annual progress report, FY 1994  

SciTech Connect (OSTI)

This document reports on the work done by the Nuclear Waste Management Section of the Chemical Technology Division (CMT), Argonne National Laboratory, in the period October 1993-September 1994. Studies have been performed to evaluate the performance of nuclear waste glass and spent fuel samples under unsaturated conditions (low volume water contact) that are likely to exist in the Yucca Mountain environment being considered as a potential site for a high-level waste repository. Tests with simulated waste glasses have been in progress for over eight years and demonstrate that actinides from initially fresh glass surfaces will be released as a result of the spallation of reacted glass layers from the surface, as the small volume of water passes over the waste form. Studies are also underway to evaluate the performance of spent fuel samples and unirradiated UO{sub 2} in projected repository conditions. Tests with UO{sub 2} have been ongoing for nine years and show that the oxidation of UO{sub 2} occurs rapidly, and the resulting paragenetic sequence of secondary phases that form on the sample surface is similar to that observed in natural analogues. The reaction of spent fuel samples under conditions similar to those used with UO{sub 2} have been in progress for nearly two years, and the results suggest that spent fuel follows the same reaction progress as UO{sub 2}. The release of individual fission products and transuranic elements was not congruent, with the release being controlled by the formation of small particles or colloids that are suspended in solution and transported away from the waste form. The reaction progress depends on the composition of the spent fuel samples used and, likely, on the composition of the groundwater that contacts the waste form.

Bates, J.K.; Fortner, J.A.; Finn, P.A.; Wronkiewicz, D.J.; Hoh, J.C.; Emery, J.W.; Buck, E.C.; Wolf, S.F.

1995-02-01T23:59:59.000Z

160

FY 2007 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2005 FY 2006 FY 2007 Current Current Congressional Approp. Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and conservation Operation and maintenance............................................ 1,779,399 1,791,372 1,917,331 +125,959 +7.0% Construction................................................................... 22,416 21,255 6,030 -15,225 -71.6% Total, Energy supply and conservation.............................. 1,801,815 1,812,627 1,923,361 +110,734 +6.1% Fossil energy programs Clean coal technology..................................................... -160,000 -20,000 -- +20,000 +100.0% Fossil energy research and development.......................

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

FY 2008 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2006 FY 2007 FY 2008 Current Congressional Congressional Approp. Request Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and conservation Operation and maintenance........................................... 1,781,242 1,917,331 2,187,943 +270,612 +14.1% Construction.................................................................... 31,155 6,030 -- -6,030 -100.0% Total, Energy supply and conservation............................. 1,812,397 1,923,361 2,187,943 +264,582 +13.8% Fossil energy programs Clean coal technology.................................................... -20,000 -- -58,000 -58,000 N/A Fossil energy research and development......................

162

Contract/Project Management  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

65% 100% Five projects >100M achieved CD-2 in FY10. PDRI represents Project Definition Index Rating. 5. TRA Use: By end of FY11, 80% of projects >750M will implement TRA no...

163

Total............................................................  

U.S. Energy Information Administration (EIA) Indexed Site

Total................................................................... Total................................................................... 111.1 2,033 1,618 1,031 791 630 401 Total Floorspace (Square Feet) Fewer than 500............................................... 3.2 357 336 113 188 177 59 500 to 999....................................................... 23.8 733 667 308 343 312 144 1,000 to 1,499................................................. 20.8 1,157 1,086 625 435 409 235 1,500 to 1,999................................................. 15.4 1,592 1,441 906 595 539 339 2,000 to 2,499................................................. 12.2 2,052 1,733 1,072 765 646 400 2,500 to 2,999................................................. 10.3 2,523 2,010 1,346 939 748 501 3,000 to 3,499................................................. 6.7 3,020 2,185 1,401 1,177 851 546

164

Contractor: Contract Number: Contract Type: Total Estimated  

Broader source: Energy.gov (indexed) [DOE]

Number: Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Earned FY2008 $2,550,203 FY2009 $39,646,446 FY2010 $64,874,187 FY2011 $66,253,207 FY2012 $41,492,503 FY2013 $0 FY2014 FY2015 FY2016 FY2017 FY2018 Cumulative Fee Earned $214,816,546 Fee Available $2,550,203 Minimum Fee $77,931,569 $69,660,249 Savannah River Nuclear Solutions LLC $458,687,779 $0 Maximum Fee Fee Information $88,851,963 EM Contractor Fee Site: Savannah River Site Office, Aiken, SC Contract Name: Management & Operating Contract September 2013 DE-AC09-08SR22470

165

NETL: News Release -DOE Selects Projects Totaling $12.4 Million Aimed at  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1, 2011 1, 2011 DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection Focus is on Shale Gas, Enhanced Oil Recovery Washington, D.C. - A total of 11 research projects that will help find ways to extract more energy from unconventional oil and gas resources while reducing environmental risks have been selected totaling $12.4 million by the U.S. Department of Energy's (DOE) Office of Fossil Energy (FE). MORE INFO Link to RPSEA website The selections include $10.3 million for eight projects that will reduce the environmental risks of shale gas development while accelerating the application of new exploration and production technologies; and $2.1 million for three projects investigating innovative processes for

166

Total...................  

Gasoline and Diesel Fuel Update (EIA)

4,690,065 52,331,397 2,802,751 4,409,699 7,526,898 209,616 1993 Total................... 4,956,445 52,535,411 2,861,569 4,464,906 7,981,433 209,666 1994 Total................... 4,847,702 53,392,557 2,895,013 4,533,905 8,167,033 202,940 1995 Total................... 4,850,318 54,322,179 3,031,077 4,636,500 8,579,585 209,398 1996 Total................... 5,241,414 55,263,673 3,158,244 4,720,227 8,870,422 206,049 Alabama ...................... 56,522 766,322 29,000 62,064 201,414 2,512 Alaska.......................... 16,179 81,348 27,315 12,732 75,616 202 Arizona ........................ 27,709 689,597 28,987 49,693 26,979 534 Arkansas ..................... 46,289 539,952 31,006 67,293 141,300 1,488 California ..................... 473,310 8,969,308 235,068 408,294 693,539 36,613 Colorado...................... 110,924 1,147,743

167

Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Jennifer Kurtz (Primary Contact), Keith Wipke, Sam Sprik, Todd Ramsden, Genevieve Saur, and Chris Ainscough National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401-3305 Phone: (303) 275-4061 Email: jennifer.kurtz@nrel.gov DOE Manager HQ: Sara Dillich Phone: (202) 586-7925 Email: Sara.Dillich@ee.doe.gov Subcontractors: Pacific Northwest National Laboratory, Richland, WA Project Start Date: August 2009 Project End Date: December 2012, with future evaluations covered under DOE's Technology Validation sub-program Objectives Perform an independent assessment of technology in * real-world operation conditions, focusing on fuel cell

168

Small Business Innovative Research (SBIR) Hydrogen Program New Projects Awarded in FY 2007, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2007 Annual Progress Report DOE Hydrogen Program The Small Business Innovation Research (SBIR) Program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve R&D objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non-profit research institution. For more information about

169

X. Small Business Innovative Research (SBIR) Hydrogen Program New Projects Awarded in FY 2006, excerpt from DOE Hydrogen Program 2006 Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

61 61 FY 2006 Annual Progress Report DOE Hydrogen Program The Small Business Innovation Research (SBIR) program provides small businesses with opportunities to participate in DOE research activities by exploring new and innovative approaches to achieve R&D objectives. The funds set aside for SBIR projects are used to support an annual competition for Phase I awards of up to $100,000 each for about nine months to explore the feasibility of innovative concepts. Phase II is the principal research or R&D effort, and these awards are up to $750,000 over a two-year period. Small Business Technology Transfer (STTR) projects include substantial (at least 30%) cooperative research collaboration between the small business and a non- profit research institution.

170

Electric Markets Technical Assistance Program: FY1999 Grant Descriptions  

Broader source: Energy.gov (indexed) [DOE]

FY1999 Grant FY1999 Grant Descriptions and Contact Information Electric Markets Technical Assistance Program: FY1999 Grant Descriptions and Contact Information Public Benefits and Distributed Generation Outreach Project The National Association of Regulatory Utility Commissioners (NARUC) will hold collaborative workshops with key stakeholders to build consensus on effective policy options for emerging competitive distributed generation markets. FY1999 Grant Descriptions and Contact Information More Documents & Publications Electric Restructuring Outreach Activities and Information Dissemination to State Public Utility Regulators Electric Markets Technical Assistance Program: FY2001 Grant Descriptions and Contact Information Electric Markets Technical Assistance Program: FY2003 Grant Descriptions

171

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

172

Total..........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

7.1 7.1 19.0 22.7 22.3 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................................... 3.2 2.1 0.6 Q 0.4 500 to 999........................................................... 23.8 13.6 3.7 3.2 3.2 1,000 to 1,499..................................................... 20.8 9.5 3.7 3.4 4.2 1,500 to 1,999..................................................... 15.4 6.6 2.7 2.5 3.6 2,000 to 2,499..................................................... 12.2 5.0 2.1 2.8 2.4 2,500 to 2,999..................................................... 10.3 3.7 1.8 2.8 2.1 3,000 to 3,499..................................................... 6.7 2.0 1.4 1.7 1.6 3,500 to 3,999..................................................... 5.2 1.6 0.8 1.5 1.4 4,000 or More.....................................................

173

Total..........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

0.7 0.7 21.7 6.9 12.1 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................................... 3.2 0.9 0.6 Q Q 500 to 999........................................................... 23.8 9.0 4.2 1.5 3.2 1,000 to 1,499..................................................... 20.8 8.6 4.7 1.5 2.5 1,500 to 1,999..................................................... 15.4 6.0 2.9 1.2 1.9 2,000 to 2,499..................................................... 12.2 4.1 2.1 0.7 1.3 2,500 to 2,999..................................................... 10.3 3.0 1.8 0.5 0.7 3,000 to 3,499..................................................... 6.7 2.1 1.2 0.5 0.4 3,500 to 3,999..................................................... 5.2 1.5 0.8 0.3 0.4 4,000 or More.....................................................

174

Total..........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

25.6 25.6 40.7 24.2 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................................... 3.2 0.9 0.5 0.9 1.0 500 to 999........................................................... 23.8 4.6 3.9 9.0 6.3 1,000 to 1,499..................................................... 20.8 2.8 4.4 8.6 5.0 1,500 to 1,999..................................................... 15.4 1.9 3.5 6.0 4.0 2,000 to 2,499..................................................... 12.2 2.3 3.2 4.1 2.6 2,500 to 2,999..................................................... 10.3 2.2 2.7 3.0 2.4 3,000 to 3,499..................................................... 6.7 1.6 2.1 2.1 0.9 3,500 to 3,999..................................................... 5.2 1.1 1.7 1.5 0.9 4,000 or More.....................................................

175

Total..........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

4.2 4.2 7.6 16.6 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................................... 3.2 1.0 0.2 0.8 500 to 999........................................................... 23.8 6.3 1.4 4.9 1,000 to 1,499..................................................... 20.8 5.0 1.6 3.4 1,500 to 1,999..................................................... 15.4 4.0 1.4 2.6 2,000 to 2,499..................................................... 12.2 2.6 0.9 1.7 2,500 to 2,999..................................................... 10.3 2.4 0.9 1.4 3,000 to 3,499..................................................... 6.7 0.9 0.3 0.6 3,500 to 3,999..................................................... 5.2 0.9 0.4 0.5 4,000 or More.....................................................

176

Total.........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

Floorspace (Square Feet) Floorspace (Square Feet) Total Floorspace 2 Fewer than 500.................................................. 3.2 Q 0.8 0.9 0.8 0.5 500 to 999.......................................................... 23.8 1.5 5.4 5.5 6.1 5.3 1,000 to 1,499.................................................... 20.8 1.4 4.0 5.2 5.0 5.2 1,500 to 1,999.................................................... 15.4 1.4 3.1 3.5 3.6 3.8 2,000 to 2,499.................................................... 12.2 1.4 3.2 3.0 2.3 2.3 2,500 to 2,999.................................................... 10.3 1.5 2.3 2.7 2.1 1.7 3,000 to 3,499.................................................... 6.7 1.0 2.0 1.7 1.0 1.0 3,500 to 3,999.................................................... 5.2 0.8 1.5 1.5 0.7 0.7 4,000 or More.....................................................

177

Total..........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

. . 111.1 20.6 15.1 5.5 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................................... 3.2 0.9 0.5 0.4 500 to 999........................................................... 23.8 4.6 3.6 1.1 1,000 to 1,499..................................................... 20.8 2.8 2.2 0.6 1,500 to 1,999..................................................... 15.4 1.9 1.4 0.5 2,000 to 2,499..................................................... 12.2 2.3 1.7 0.5 2,500 to 2,999..................................................... 10.3 2.2 1.7 0.6 3,000 to 3,499..................................................... 6.7 1.6 1.0 0.6 3,500 to 3,999..................................................... 5.2 1.1 0.9 0.3 4,000 or More.....................................................

178

Total..........................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

7.1 7.1 7.0 8.0 12.1 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................................... 3.2 0.4 Q Q 0.5 500 to 999........................................................... 23.8 2.5 1.5 2.1 3.7 1,000 to 1,499..................................................... 20.8 1.1 2.0 1.5 2.5 1,500 to 1,999..................................................... 15.4 0.5 1.2 1.2 1.9 2,000 to 2,499..................................................... 12.2 0.7 0.5 0.8 1.4 2,500 to 2,999..................................................... 10.3 0.5 0.5 0.4 1.1 3,000 to 3,499..................................................... 6.7 0.3 Q 0.4 0.3 3,500 to 3,999..................................................... 5.2 Q Q Q Q 4,000 or More.....................................................

179

Total..........................................................  

U.S. Energy Information Administration (EIA) Indexed Site

.. .. 111.1 24.5 1,090 902 341 872 780 441 Total Floorspace (Square Feet) Fewer than 500...................................... 3.1 2.3 403 360 165 366 348 93 500 to 999.............................................. 22.2 14.4 763 660 277 730 646 303 1,000 to 1,499........................................ 19.1 5.8 1,223 1,130 496 1,187 1,086 696 1,500 to 1,999........................................ 14.4 1.0 1,700 1,422 412 1,698 1,544 1,348 2,000 to 2,499........................................ 12.7 0.4 2,139 1,598 Q Q Q Q 2,500 to 2,999........................................ 10.1 Q Q Q Q Q Q Q 3,000 or More......................................... 29.6 0.3 Q Q Q Q Q Q Heated Floorspace (Square Feet) None...................................................... 3.6 1.8 1,048 0 Q 827 0 407 Fewer than 500......................................

180

Total...................................................................  

U.S. Energy Information Administration (EIA) Indexed Site

2,033 2,033 1,618 1,031 791 630 401 Total Floorspace (Square Feet) Fewer than 500............................................... 3.2 357 336 113 188 177 59 500 to 999....................................................... 23.8 733 667 308 343 312 144 1,000 to 1,499................................................. 20.8 1,157 1,086 625 435 409 235 1,500 to 1,999................................................. 15.4 1,592 1,441 906 595 539 339 2,000 to 2,499................................................. 12.2 2,052 1,733 1,072 765 646 400 2,500 to 2,999................................................. 10.3 2,523 2,010 1,346 939 748 501 3,000 to 3,499................................................. 6.7 3,020 2,185 1,401 1,177 851 546 3,500 to 3,999................................................. 5.2 3,549 2,509 1,508

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Total...........................................................  

U.S. Energy Information Administration (EIA) Indexed Site

26.7 26.7 28.8 20.6 13.1 22.0 16.6 38.6 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500................................... 3.2 1.9 0.9 Q Q Q 1.3 2.3 500 to 999........................................... 23.8 10.5 7.3 3.3 1.4 1.2 6.6 12.9 1,000 to 1,499..................................... 20.8 5.8 7.0 3.8 2.2 2.0 3.9 8.9 1,500 to 1,999..................................... 15.4 3.1 4.2 3.4 2.0 2.7 1.9 5.0 2,000 to 2,499..................................... 12.2 1.7 2.7 2.9 1.8 3.2 1.1 2.8 2,500 to 2,999..................................... 10.3 1.2 2.2 2.3 1.7 2.9 0.6 2.0 3,000 to 3,499..................................... 6.7 0.9 1.4 1.5 1.0 1.9 0.4 1.4 3,500 to 3,999..................................... 5.2 0.8 1.2 1.0 0.8 1.5 0.4 1.3 4,000 or More...................................... 13.3 0.9 1.9 2.2 2.0 6.4 0.6 1.9 Heated Floorspace

182

Total...........................................................  

U.S. Energy Information Administration (EIA) Indexed Site

14.7 14.7 7.4 12.5 12.5 18.9 18.6 17.3 9.2 Floorspace (Square Feet) Total Floorspace 1 Fewer than 500.................................... 3.2 0.7 Q 0.3 0.3 0.7 0.6 0.3 Q 500 to 999........................................... 23.8 2.7 1.4 2.2 2.8 5.5 5.1 3.0 1.1 1,000 to 1,499..................................... 20.8 2.3 1.4 2.4 2.5 3.5 3.5 3.6 1.6 1,500 to 1,999..................................... 15.4 1.8 1.4 2.2 2.0 2.4 2.4 2.1 1.2 2,000 to 2,499..................................... 12.2 1.4 0.9 1.8 1.4 2.2 2.1 1.6 0.8 2,500 to 2,999..................................... 10.3 1.6 0.9 1.1 1.1 1.5 1.5 1.7 0.8 3,000 to 3,499..................................... 6.7 1.0 0.5 0.8 0.8 1.2 0.8 0.9 0.8 3,500 to 3,999..................................... 5.2 1.1 0.3 0.7 0.7 0.4 0.5 1.0 0.5 4,000 or More...................................... 13.3

183

Total................................................  

U.S. Energy Information Administration (EIA) Indexed Site

.. .. 111.1 86.6 2,522 1,970 1,310 1,812 1,475 821 1,055 944 554 Total Floorspace (Square Feet) Fewer than 500............................. 3.2 0.9 261 336 162 Q Q Q 334 260 Q 500 to 999.................................... 23.8 9.4 670 683 320 705 666 274 811 721 363 1,000 to 1,499.............................. 20.8 15.0 1,121 1,083 622 1,129 1,052 535 1,228 1,090 676 1,500 to 1,999.............................. 15.4 14.4 1,574 1,450 945 1,628 1,327 629 1,712 1,489 808 2,000 to 2,499.............................. 12.2 11.9 2,039 1,731 1,055 2,143 1,813 1,152 Q Q Q 2,500 to 2,999.............................. 10.3 10.1 2,519 2,004 1,357 2,492 2,103 1,096 Q Q Q 3,000 or 3,499.............................. 6.7 6.6 3,014 2,175 1,438 3,047 2,079 1,108 N N N 3,500 to 3,999.............................. 5.2 5.1 3,549 2,505 1,518 Q Q Q N N N 4,000 or More...............................

184

FY 2009 CONTRACTOR PURCHASING BALANCED SCORECARD RESULTS DEPARTMENTAL AVERAGES BY FISCAL YEAR  

Broader source: Energy.gov (indexed) [DOE]

9 CONTRACTOR PURCHASING BALANCED SCORECARD RESULTS 9 CONTRACTOR PURCHASING BALANCED SCORECARD RESULTS DEPARTMENTAL AVERAGES BY FISCAL YEAR FY 2009 FY2005 FY2006 FY 2007 FY 2008 FY 2009 National Tarpets Customer Perspective Objective: Customer Satisfaction Core Measure: Customer Satisfaction Rating Internal Business Perspective Objective: Effective Internal Controls 93 94 Core Measure: assessment of degree to which purchasing systems are in compliance Objective: Effective Supplier Management 8 1 83 Core Measure: % Delivery on-time, including Just-in-Time Objective: Use of Effective Competition 74 69 Core Measure: % of total dollars obligated on actions over $100,000 that were competed 97 97 N/A - locally set 84 8 6 84 67 74 N/A - locally set 2 FY 2009 FY 2005 FY 2006 FY 2007 FY 2008 FY2009 National Targets

185

FY 2008 CONTRACTOR PURCHASING BALANCED SCORECARD RESULTS DEPARTMENTAL AVERAGES BY FISCAL YEAR  

Broader source: Energy.gov (indexed) [DOE]

8 CONTRACTOR PURCHASING BALANCED SCORECARD RESULTS 8 CONTRACTOR PURCHASING BALANCED SCORECARD RESULTS DEPARTMENTAL AVERAGES BY FISCAL YEAR FY 2008 FY 2004 FY 2005 FY2006 FY2007 FY2008 National Taraets Customer Perspective Objective: Customer Satisfaction 93 9 3 Core Measure: Customer Satisfaction Rating Internal Business Perspective Objective: Effective Internal Controls 95 93 Core Measure: assessment of degree to which purchasing systems are in compliance Objective: Effective Supplier Management 8 3 8 1 Core Measure: % Delivery on-time, including Just-in-Time Objective: Use of Effective Competition 7 1 74 Core Measure: % of total dollars obligated on actions over $100,000 that were competed N/A - locally set 84 N/A - locally set 2 FY 2008 FY 2004 FY 2005 FY2006 FY 2007 FY2008 National Tarpets

186

Tanks Focus Area Site Needs Assessment FY 2000  

SciTech Connect (OSTI)

This document summarizes the Tanks Focus Area (TFA's) process of collecting, analyzing, and responding to high-level radioactive tank waste science and technology needs developed from across the DOE complex in FY 2000. The document also summarizes each science and technology need, and provides an initial prioritization of TFA's projected work scope for FY 2001 and FY 2002.

Allen, Robert W.

2000-03-10T23:59:59.000Z

187

"Table 21. Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual"  

U.S. Energy Information Administration (EIA) Indexed Site

Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual" Total Energy Related Carbon Dioxide Emissions, Projected vs. Actual" "Projected" " (million metric tons)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",5060,5129.666667,5184.666667,5239.666667,5287.333333,5335,5379,5437.666667,5481.666667,5529.333333,5599,5657.666667,5694.333333,5738.333333,5797,5874,5925.333333,5984 "AEO 1995",,5137,5173.666667,5188.333333,5261.666667,5309.333333,5360.666667,5393.666667,5441.333333,5489,5551.333333,5621,5679.666667,5727.333333,5775,5841,5888.666667,5943.666667 "AEO 1996",,,5181.817301,5223.645142,5294.776326,5354.687297,5416.802205,5463.67395,5525.288005,5588.52771,5660.226888,5734.87972,5812.398031,5879.320068,5924.814575,5981.291626,6029.640422,6086.804077,6142.120972

188

FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program  

Broader source: Energy.gov [DOE]

This FY 2003 Progress Report presents a description of the fuel cell and hydrogen research conducted by the Hydrogen, Fuel Cells and Infrastructure Technologies Program in fiscal year 2003 (FY 2003), projects to be implemented in FY 2004, and the research priorities for FY 2004.

189

FY 2005 LDRD Report to Congress  

Broader source: Energy.gov (indexed) [DOE]

United States Department of Energy United States Department of Energy Laboratory, Plant or Site Directed Research and Development Report Project List -- Fiscal Year 2005 ANL - Argonne National Lab Project ID FY Total Project Name Multidisciplinary Theory P/ANL2003-336 $298000 The Use of Synchrotron Radiation Sources for Homeland Security - Terahertz and X-Ray Radiation P/ANL2003-337 $241600 Modeling Near-Field Atmospheric Dispersion and the Potential Health and Economic Impacts from Terrorism Scenarios Involving "Dirty Bombs" or Similar Devices P/ANL2003-338 $218500 Core-Shell Nanocrystal Spring Magnets P/ANL2003-340 $60400 Simulation and Modeling of Reactivity in Nanoporous Materials P/ANL2003-341 $46700 Development of Germanium Double Sided Strip Detectors for Nuclear Imaging Applications

190

FY 2007 Congressional Request  

Office of Environmental Management (EM)

FY 2006 Appropriation FY 2007 Request Laboratory Table 70 Naval Petroleum and Oil Shale Reserves Naval Petroleum and Oil Shale Reserves Naval Petroleum and Oil Shale...

191

Annual Report FY2013 URI Foundation Awards  

E-Print Network [OSTI]

Annual Report FY2013 Chapter 7 URI Foundation Awards #12;Principal Inves.gator Donor COLLEGE-Ending June 30, 2013 7.1 #12;Principal Inves.gator Donor COLLEGE Project/Research AMOUNT Nedra

Rhode Island, University of

192

"Table 20. Total Delivered Transportation Energy Consumption, Projected vs. Actual"  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Transportation Energy Consumption, Projected vs. Actual" Total Delivered Transportation Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",23.62,24.08,24.45,24.72,25.06,25.38,25.74,26.16,26.49,26.85,27.23,27.55,27.91,28.26,28.61,28.92,29.18,29.5 "AEO 1995",,23.26,24.01,24.18,24.69,25.11,25.5,25.86,26.15,26.5,26.88,27.28,27.66,27.99,28.25,28.51,28.72,28.94 "AEO 1996",,,23.89674759,24.08507919,24.47502899,24.84881783,25.25887871,25.65527534,26.040205,26.38586426,26.72540092,27.0748024,27.47158241,27.80837631,28.11616135,28.3992157,28.62907982,28.85912895,29.09081459 "AEO 1997",,,,24.68686867,25.34906006,25.87225533,26.437994,27.03513145,27.52499771,27.96490097,28.45482063,28.92999458,29.38239861,29.84147453,30.26097488,30.59760475,30.85550499,31.10873222,31.31938744

193

"Table 19. Total Delivered Industrial Energy Consumption, Projected vs. Actual"  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Industrial Energy Consumption, Projected vs. Actual" Total Delivered Industrial Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",25.43,25.904,26.303,26.659,26.974,27.062,26.755,26.598,26.908,27.228,27.668,28.068,28.348,28.668,29.068,29.398,29.688,30.008 "AEO 1995",,26.164,26.293,26.499,27.044,27.252,26.855,26.578,26.798,27.098,27.458,27.878,28.158,28.448,28.728,29.038,29.298,29.608 "AEO 1996",,,26.54702756,26.62236823,27.31312376,27.47668697,26.90313339,26.47577946,26.67685979,26.928811,27.23795407,27.58448499,27.91057103,28.15050595,28.30145734,28.518,28.73702901,28.93001263,29.15872662 "AEO 1997",,,,26.21291769,26.45981795,26.88483478,26.67847443,26.55107968,26.78246968,27.07367604,27.44749539,27.75711339,28.02446072,28.39156621,28.69999783,28.87316602,29.01207631,29.19475644,29.37683575

194

"Table 18. Total Delivered Commercial Energy Consumption, Projected vs. Actual"  

U.S. Energy Information Administration (EIA) Indexed Site

Total Delivered Commercial Energy Consumption, Projected vs. Actual" Total Delivered Commercial Energy Consumption, Projected vs. Actual" "Projected" " (quadrillion Btu)" ,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011 "AEO 1994",6.82,6.87,6.94,7,7.06,7.13,7.16,7.22,7.27,7.32,7.36,7.38,7.41,7.45,7.47,7.5,7.51,7.55 "AEO 1995",,6.94,6.9,6.95,6.99,7.02,7.05,7.08,7.09,7.11,7.13,7.15,7.17,7.19,7.22,7.26,7.3,7.34 "AEO 1996",,,7.059859276,7.17492485,7.228339195,7.28186655,7.336973667,7.387932777,7.442782879,7.501244545,7.561584473,7.623688221,7.684037209,7.749266148,7.815915108,7.884147644,7.950204372,8.016282082,8.085801125 "AEO 1997",,,,7.401538849,7.353548527,7.420701504,7.48336792,7.540113449,7.603093624,7.663851738,7.723834991,7.783358574,7.838726044,7.89124918,7.947964668,8.008976936,8.067288399,8.130317688,8.197405815

195

Department Human Resources Bulletin, #027, FY06, dated August 1,2006 DOC Demonstration Project Operating Procedures  

E-Print Network [OSTI]

Project Operating Procedures Purpose This issuance provides NOAA managers with pay setting flexibilitywhen Demonstration Project OperatingProcedures. . . . , . . Background On August 1,2006, the Department issued Human setting pay for Presidential Management Fellows (PMF) who are covered by the DOC Demonstration Project

196

A Joint Theory and Experimental Project in the Synthesis and Testing of Porous COFs for Onboard Vehicular Hydrogen Storage - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Omar M. Yaghi Department of Chemistry and Biochemistry University of California - Los Angeles 607 Charles E. Young Drive East Los Angeles, CA 90095 Phone: (310) 206-0398 Email: yaghi@chem.ucla.edu DOE Managers HQ: Ned Stetson Phone: (202) 586-9995 Email: Ned.Stetson@ee.doe.gov GO: Katie Randolph Phone: (720) 356-1759 Email: Katie.Randolph@go.doe.gov Contract Number: DE-FG36-08GO18141 Project Start Date: September 1, 2008 Project End Date: July 31, 2012 Fiscal Year (FY) 2012 Objectives Design optimal frameworks with potential metal binding * sites for metal impregnation. Predict H * 2 uptake isotherm for designed frameworks using our newly developed force field.

197

COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement that is not bourn by  

E-Print Network [OSTI]

1 COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement. There are primarily three types of cost sharing that may occur on sponsored projects: Mandatory cost sharing. For example, the National Science Foundation requires mandatory cost sharing for some of its projects. COST

Cui, Yan

198

FY 2006 Summary Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

Budget by Organization Budget by Organization (discretionary dollars in thousands) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Discretionary Summary By Organization National Security Weapons............................................................... 6,447,159 6,583,350 6,630,133 +46,783 +0.7% Defense Nuclear Nonproliferation.......................... 1,367,709 1,422,103 1,637,239 +215,136 +15.1% Naval Reactors...................................................... 761,872 801,437 786,000 -15,437 -1.9% Office of the Administrator..................................... 352,949 357,051 343,869 -13,182 -3.7% Other Defense Activities......................................... -446 -- -- -- -- Total, National Nuclear Security Administration......... 8,929,243 9,163,941 9,397,241 +233,300 +2.5%

199

Contract/Project Management  

Office of Environmental Management (EM)

65% Cleanup 81% Line Item 56% Cleanup 1 Line Item system certified in 2nd qtr FY09 4. PDRI Use: By the end of FY11, 80% of projects (>100M) will use PDRI methodologies no later...

200

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Item 65% Cleanup 92% Line Item 69% Cleanup No systems certified in 3rd qtr FY09. 4. PDRI Use: By the end of FY11, 80% of projects (>100M) will use PDRI methodologies no later...

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Low-Cost, Lightweight Solar Concentrators FY13 Q2 | Department...  

Broader source: Energy.gov (indexed) [DOE]

FY13 Q2 Low-Cost, Lightweight Solar Concentrators FY13 Q2 This document summarizes the progress of this Jet Propulsion Laboratory project, funded by SunShot, for the second quarter...

202

Next Generation Solar Collectors for CSP - FY13 Q1 | Department...  

Office of Environmental Management (EM)

Next Generation Solar Collectors for CSP - FY13 Q1 Next Generation Solar Collectors for CSP - FY13 Q1 This document summarizes the progress of this 3M project, funded by SunShot,...

203

E-Print Network 3.0 - analysis center fy Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

usage Summary: step 3: data analysis and projections step 4: revise as necessary FAS GHG reduction program 12;FY 2006... reduction required at FY 2006 step 3: data analysis...

204

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Program’s Wind Integration, Transmission, and Resource Assessment and Characterization Projects from FY 2006 to FY 2014.

205

Utility Energy Savings Contract Project  

Broader source: Energy.gov (indexed) [DOE]

Utility Energy Savings Utility Energy Savings Contract Project Redstone Arsenal, Alabama Presented by Doug Dixon, Pacific Northwest National Laboratory For Mark D. Smith, PE, CEM, CEA Energy Manager, Redstone Arsenal Federal Utility Partnership Working Group - Fall 2010 UNCLASSIFIED UNCLASSIFIED 0 50 100 150 200 250 Klbs FY09 Total Hourly Steam FY09 Total Threshold $22.76 / MMBTU (Minimum take-or-pay base rate) (Consumer Price Index) Average FY09 Natural Gas Price $5.52 / MMBTU $16.91 / MMBTU (High capacity rate) (Petroleum Price Index) Hours UNCLASSIFIED Resolution * Manage the steam load to the minimum take-or- pay thresholds under the existing contract.  Prune the distribution system by eliminating long runs with low density and high thermal losses.  Ensure summer steam loads are utilized.

206

FY08-10 Project Success Metrics vFinal to Post 2011-07-20.xlsx  

Broader source: Energy.gov (indexed) [DOE]

8-2010 Project Success Metrics 8-2010 Project Success Metrics Office of Management Office of Engineering and Construction Management Program Contractor Project Name Site Approved Budget ($M) Met Success Standard Fiscal Year Completed National Nuclear Security Administration Los Alamos National Security, LLC Chemistry & Metallurgy Research Facility Radiological Laboratory Utility Office Building Los Alamos National Laboratory, NM $ 164.00 Y 2010 National Nuclear Security Administration B&W Pantex, LLC Gas Main and Distribution System Upgrade Pantex Plant, TX $ 10.82 Y 2010 National Nuclear Security Administration National Security Technologies, LLC Mercury Highway Construction Nevada National Security Site, NV

207

New Eligibility Guidelines Lead to Increase in LM’s EEOICPA Requests for FY 2014  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) experienced a 19 percent increase in the total number of stakeholder requests from fiscal year (FY) 2013 to FY 2014, according...

208

Understanding our Genetic Inheritance: The U.S. Human Genome Project, The First Five Years FY 1991--1995  

DOE R&D Accomplishments [OSTI]

The Human Genome Initiative is a worldwide research effort with the goal of analyzing the structure of human DNA and determining the location of the estimated 100,000 human genes. In parallel with this effort, the DNA of a set of model organisms will be studied to provide the comparative information necessary for understanding the functioning of the human genome. The information generated by the human genome project is expected to be the source book for biomedical science in the 21st century and will by of immense benefit to the field of medicine. It will help us to understand and eventually treat many of the more than 4000 genetic diseases that affect mankind, as well as the many multifactorial diseases in which genetic predisposition plays an important role. A centrally coordinated project focused on specific objectives is believed to be the most efficient and least expensive way of obtaining this information. The basic data produced will be collected in electronic databases that will make the information readily accessible on convenient form to all who need it. This report describes the plans for the U.S. human genome project and updates those originally prepared by the Office of Technology Assessment (OTA) and the National Research Council (NRC) in 1988. In the intervening two years, improvements in technology for almost every aspect of genomics research have taken place. As a result, more specific goals can now be set for the project.

1990-04-00T23:59:59.000Z

209

IceCube Project Monthly Report August 2005  

E-Print Network [OSTI]

IceCube Project Monthly Report August 2005 Accomplishments All of the DOMs installed at the South additional emphasis on training and procedures. The training program for IceCube personnel scheduled to work-05 S-05 O-05 N-05 D-05 J-06 F-06 M-06 3&4 FY06 FY07 FY08 FY09 FY10 FY11 IceCube Project Baseline

Saffman, Mark

210

FY 2007 Secretary Rollout  

Broader source: Energy.gov (indexed) [DOE]

Budget Budget DOE: Energy, Science, and Security February 6, 2006 1 Guiding Principles * Advancing our National Security * Reducing Dependence on Foreign Oil * Increasing Economic Competitiveness through Scientific Discovery * Honoring our Commitments * Managing for Excellence Supporting our Nation's Highest Priorities 2 DOE Budget : FY 2006 and FY 2007 ($ in Billions) National Security $9.1 Energy and Environm ent $9.9 Science $3.6 Corporate M anagem ent $1.0 FY 2006 Appropriation $23.6 Billion FY 2007 Request $23.6 Billion FY 2007 request is level with FY 2006 In real terms, $0.5 billion below FY 2006 National Se curity $9.3 Ene rgy and Environm e nt $9.2 Science $4.1 Corporate M anage m ent $1.0 3 FY 2007 DOE Budget Breakout By Organization ($ in Millions) -$3 $983 $986 $1,002 Corporate Management/FERC

211

Carbon dioxide and climate. [Appendix includes names and addresses of the Principal Investigators for the research projects funded in FY1991  

SciTech Connect (OSTI)

Global climate change is a serious environmental concern, and the US has developed An Action Agenda'' to deal with it. At the heart of the US effort is the US Global Change Research Program (USGCRP), which has been developed by the Committee on Earth and Environmental Sciences (CEES) of the Federal Coordinating Council for Sciences, Engineering, and Technology (FCCSET). The USGCRP will provide the scientific basis for sound policy making on the climate-change issue. The DOE contribution to the USGCRP is the Carbon Dioxide Research Program, which now places particular emphasis on the rapid improvement of the capability to predict global and regional climate change. DOE's Carbon Dioxide Research Program has been addressing the carbon dioxide-climate change connection for more than twelve years and has provided a solid scientific foundation for the USGCRP. The expansion of the DOE effort reflects the increased attention that the Department has placed on the issue and is reflected in the National Energy Strategy (NES) that was released in 1991. This Program Summary describes projects funded by the Carbon Dioxide Research Program during FY 1991 and gives a brief overview of objectives, organization, and accomplishments. The Environmental Sciences Division of the Office of Health and Environmental Research, Office of Energy Research supports a Carbon Dioxide Research Program to determine the scientific linkage between the rise of greenhouse gases in the atmosphere, especially carbon dioxide, and climate and vegetation change. One facet is the Core CO{sub 2} Program, a pioneering program that DOE established more than 10 years ago to understand and predict the ways that fossil-fuel burning could affect atmospheric CO{sub 2} concentration, global climate, and the Earth's biosphere. Major research areas are: global carbon cycle; climate detection and models of climate change; vegetation research; resource analysis; and, information and integration.

Not Available

1991-10-01T23:59:59.000Z

212

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program  

SciTech Connect (OSTI)

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energy’s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 “Quality Assurance Program” under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as “not applicable” to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

2008-03-07T23:59:59.000Z

213

Project Submission Template  

Broader source: Energy.gov (indexed) [DOE]

International Cooperation International Cooperation Project Title: Country/Organizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: Work Completed to Date: Overview of Proposed Scope for FY12: Summary Brief Description of Specific Project(s): Timeline: Estimated Cost: Status: CONTINUATION or NEW? Type of Contracting Instrument: (Int'l agreements, lab-lab agreement, etc) Participant Organizations General Scope Budget Foreign (Technical Scope) US (Overhead rate) (Technical Scope) TOTAL Budget Breakdown: Overhead rates and experimental work: APPROVE ____________________ DISAPPROVE ____________________ Approving Official: Associate PDAS, Alice Williams, EM-2.1

214

FY 2008 Control Table by Organization  

Office of Environmental Management (EM)

Congressional Approp. Request Request % FY 2008 vs. FY 2007 Naval Petroleum & Oil Shale Reserves Production operations......

215

FY 2014 Metric Summary | Department of Energy  

Office of Environmental Management (EM)

4 Metric Summary FY 2014 Metric Summary FY 2014 Q1 Metric Summary.pdf FY 2014 Q2 Metric Summary.pdf FY 2014 Q3 Metric Summary.pdf More Documents & Publications FY 2014 Q3 Metric...

216

FY 2013 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

7 7 Department of Energy FY 2013 Congressional Budget Request Budget Highlights g g g February 2012 Office of Chief Financial Officer DOE/CF-0077 Department of Energy FY 2013 Congressional Budget Request Budget Highlights g g g February 2012 Office of Chief Financial Officer Printed with soy ink on recycled paper Table of Contents LETTER FROM THE SECRETARY ...................................................................................................................................................................... 1 INTRODUCTION .............................................................................................................................................................................................. 3 DEPARTMENT OF ENERGY FY 2013 PROGRAM OFFICE HIGHLIGHTS............................................................................................................ 9

217

FY 2012 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

0 0 Volume 4 Department of Energy FY 2012 Congressional Budget Request Science Science February 2011 Office of Chief Financial Officer Volume 4 DOE/CF-0060 Volume 4 Department of Energy FY 2012 Congressional Budget Request Science Science February 2011 Office of Chief Financial Officer Volume 4 Printed with soy ink on recycled paper Department of Energy/ Science FY 2012 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary .............................................................................................................3 Appropriation Language ...........................................................................................................................5 Overview ...................................................................................................................................................7

218

FY 2011 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/CF-0050 Volume 4 Science Department of Energy FY 2011 Congressional Budget Request February 2010 Office of Chief Financial Officer Volume 4 DOE/CF-0050 Volume 4 Science Printed with soy ink on recycled paper Department of Energy FY 2011 Congressional Budget Request Department of Energy/ Science FY 2011 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary.............................................................................................................3 Appropriation Language ...........................................................................................................................5 Overview...................................................................................................................................................7

219

FY 2013 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

5 5 DOE/CF-0075 Volume 5 Environmental Management Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 5 DOE/CF-0075 Volume 5 Environmental Management Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Environmental Management Page 1 FY 2013 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary ............................................................................................................................................ 3 Appropriation Language .......................................................................................................................................................... 5

220

FY 2011 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

5 5 DOE/CF-0051 Volume 5 Environmental Management Department of Energy FY 2011 Congressional Budget Request February 2010 Office of Chief Financial Officer Volume 5 DOE/CF-0051 Volume 5 Environmental Management Printed with soy ink on recycled paper Department of Energy FY 2011 Congressional Budget Request Department of Energy/ Environmental Management FY 2011 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary.............................................................................................................3 Appropriation Language ...........................................................................................................................5 Overview...................................................................................................................................................7

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FY 2012 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

4 4 Department of Energy FY 2012 Congressional Budget Request Budget Highlights g g g February 2012 Office of Chief Financial Officer DOE/CF-0064 Department of Energy FY 2012 Congressional Budget Request Budget Highlights g g g February 2012 Office of Chief Financial Officer Printed with soy ink on recycled paper Table of Contents INTRODUCTION .......................................................................................................................................................................................... 1 DEPARTMENT OF ENERGY FY 2012 PROGRAM OFFICE HIGHLIGHTS .......................................................................................................... 7 DEPARTMENT OF ENERGY BUDGET BY ORGANIZATION .......................................................................................................................... 15

222

FY 2008 Budget Highlights  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

requests, the FY 2008 budget request continues to shift resources away from oil and gas research and development programs, which have sufficient market incentives for private...

223

CRSP CASH PROJECTIONS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CASH PROJECTIONS CASH PROJECTIONS FY 2012-FY 2014 ($ IN THOUSANDS) KEY: = more than $70 million = less than $70 million more than $35 million = less than $35 million ACTUAL FORECAST ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL FORECAST ACTUAL ACTUAL FORECAST FORECAST FY 2012 FY 2013 OCT 2012 NOV 2012 DEC 2012 JAN 2013 FEB 2013 MAR 2013 APR 2013 MAY 2013 JUN 2013 JUL 2013 AUG 2013 SEP 2013 SEP 2013 FY 2013 FY 2014 FY 2015 Note REVENUES Firm 141,638 $ 150,984 $ 9,356 $ 14,951 $ 15,015 $ 13,131 $ 12,470 $ 11,088 $ 11,817 $ 11,754 $ 12,954 $ 19,737 $ 13,914 $ 12,582 $ 10,652 $ 156,839 $ 152,591 $ 164,182 $ a WRP 32,170 $ 62,774 $ 755 $ 2,418

224

Performance Period Total Fee Paid FY2008  

Office of Environmental Management (EM)

Type: Maximum Fee 3,129,570 175,160 377,516 1,439,287 Fee Available 175,160 80,871 Accelerated Remediation Company (aRc) DE-AT30-07CC60013 Contractor: Contract Number:...

225

FY 2012 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

1 1 Volume 5 Department of Energy FY 2012 Congressional Budget Request Environmental Management February 2011 Office of Chief Financial Officer Volume 5 Printed with soy ink on recycled paper Environmental Management FY 2011 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary .............................................................................................................3

226

FY 2010 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/CF-038 Volume 4 Science May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 4 DOE/CF-038 Volume 4 Science Printed with soy ink on recycled paper Department of Energy/ Science FY 2010 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary.............................................................................................................3 Appropriation Language ...........................................................................................................................5 Overview...................................................................................................................................................7 Funding by Site .......................................................................................................................................21

227

FY 2011 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

DOE/CF-0046 Budget Highlights Department of Energy FY 2011 Congressional Budget Request February 2010 Office of Chief Financial Officer DOE/CF-0046 Budget Highlights Printed with soy ink on recycled paper Department of Energy FY 2011 Congressional Budget Request Table of Contents INTRODUCTION...................................................................................................................................... 1 PROGRAM HIGHLIGHTS........................................................................................................................ 5 BUDGET BY ORGANIZATION .............................................................................................................. 13 BUDGET BY APPROPRIATION............................................................................................................

228

FY 2012 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

3 3 Volume 7 Department of Energy FY 2012 Congressional Budget Request Nuclear Energy D f N l W t Di l Defense Nuclear Waste Disposal Nuclear Waste Disposal February 2011 Office of Chief Financial Officer Volume 7 Printed with soy ink on recycled paper Department of Energy/ Volume 7 FY 2012 Congressional Budget Volume 7 Table of Contents Page Appropriation Account Summary ........................................................................................................... 3

229

Fossil Energy FY 2009 Budget  

Broader source: Energy.gov [DOE]

Fossil Energy's FY 2009 budget, including request, House and Senate marks, and Omnibus appropriation.

230

FY 2010 DOE Agency Financial Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Agency Financial Reports » FY 2010 DOE Agency Financial Agency Financial Reports » FY 2010 DOE Agency Financial Report FY 2010 DOE Agency Financial Report The Department's efforts brought it closer to its goals of: expanding the frontiers of science (science, discovery and innovation) creating clean energy jobs (economic prosperity) curbing the carbon pollution that threatens our planet (clean, secure energy) reducing nuclear dangers (national security) FY 2010 was the second year of implementing the American Recovery and Reinvestment Act (Recovery Act). The Department contributed to the Administration's goal of stimulating the U.S. economy through ramping up its activities in energy-related areas of spending, project performance, and job creation. FY 2010 DOE Agency Financial Report More Documents & Publications

231

FY 2012 DOE Agency Financial Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reports » Agency Financial Reports » FY 2012 DOE Agency Financial Reports » Agency Financial Reports » FY 2012 DOE Agency Financial Report FY 2012 DOE Agency Financial Report Notable accomplishments in FY 2012 include: the first electric grid-connected tidal energy project off the coast of Maine a new approach to sea water desalination that could lower the costs of water purification new insights into the molecular structure of a hydrogen fuel cell that could aid in achieving the goal of producing electricity for transportation new advances in engineering inedible plant biomass into biofuels In the national security area, we met a major milestone of eliminating 450 metric tons of highly enriched Russian uranium taken from nuclear weapons and the dismantlement of the last remaining B53 nuclear bomb. FY 2012 Agency Financial Report

232

FY 2009 State Table  

Broader source: Energy.gov (indexed) [DOE]

State Tables State Tables Preliminary February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Printed with soy ink on recycled paper State Index Page Number FY 2009 Congressional Budget 1/30/2008 Department Of Energy (Dollars In Thousands) 9:01:45AM Page 1 of 2 FY 2007 Appropriation FY 2008 Appropriation FY 2009 Request State Table 1 1 $27,588

233

FY 2007 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Laboratory tables Laboratory tables preliminary Department of Energy FY 2007 Congressional Budget Request February 2006 Printed with soy ink on recycled paper Office of Chief Financial Officer Laboratory tables preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Laboratory / Facility Index FY 2007 Congressional Budget Page 1 of 3 (Dollars In Thousands) 12:10:40PM Department Of Energy 1/31/2006 Page Number FY 2005 Appropriation FY 2006 Appropriation FY 2007

234

FY 2010 State Table  

Broader source: Energy.gov (indexed) [DOE]

State Tables State Tables Preliminary May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Printed with soy ink on recycled paper State Index Page Number FY 2010 Congressional Budget 5/4/2009 Department Of Energy (Dollars In Thousands) 2:13:22PM Page 1 of 2 FY 2008 Appropriation FY 2009 Appropriation FY 2010 Request State Table 1 1 $46,946 $48,781 $38,844 Alabama 2 $6,569

235

FY 2008 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Laboratory Table Laboratory Table Preliminary Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Laboratory Table Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Laboratory / Facility Index FY 2008 Congressional Budget Page 1 of 3 (Dollars In Thousands) 6:51:02AM Department Of Energy 2/1/2007 Page Number FY 2006 Appropriation FY 2007 Request FY 2008 Request

236

FY 2006 State Table  

Broader source: Energy.gov (indexed) [DOE]

State Tables State Tables Preliminary Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 State Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. State Index Page Number FY 2006 Congressional Budget 1/27/2005 Department Of Energy (Dollars In Thousands) 3:32:58PM Page 1 of 2 FY 2004 Comp/Approp FY 2005 Comp/Approp FY 2006 Request State Table

237

FY 2010 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Laboratory Tables Laboratory Tables Preliminary May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Laboratory Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Printed with soy ink on recycled paper Laboratory / Facility Index FY 2010 Congressional Budget Page 1 of 3 (Dollars In Thousands) 2:08:56PM Department Of Energy 5/4/2009 Page Number FY 2008 Appropriation FY 2009 Appropriation FY 2010 Request Laboratory Table 1 1 $1,200

238

Fy 2009 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Laboratory Tables Laboratory Tables Preliminary February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Laboratory Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Printed with soy ink on recycled paper Laboratory / Facility Index FY 2009 Congressional Budget Page 1 of 3 (Dollars In Thousands) 8:59:25AM Department Of Energy 1/30/2008 Page Number FY 2007 Appropriation FY 2008 Appropriation FY 2009

239

FY 2008 State Table  

Broader source: Energy.gov (indexed) [DOE]

State Table State Table Preliminary Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer State Table Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. State Index Page Number FY 2008 Congressional Budget 2/1/2007 Department Of Energy (Dollars In Thousands) 6:53:08AM Page 1 of 2 FY 2006 Appropriation FY 2007 Request FY 2008 Request State Table 1 1 $28,332 $30,341

240

Projections up for total energy demand by IEA nations in 1990  

SciTech Connect (OSTI)

The author reviews the most recent IEA projections for energy demand to the year 2000 in IEA countries. These show that the expectations for 1990 are now higher than estimates made last year. Production of solid fuels is expected to increase from 814 million toe in 1983 to 1044 million toe in 1990 and 1345 million toe by 2000. Nearly all the increase is expected in the US, Canada and Australia.

Vielvoye, R.

1985-06-17T23:59:59.000Z

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

FY 2007 Control Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

Control Table by Organization Control Table by Organization (dollars in thousands - OMB Scoring) FY 2005 FY 2006 FY 2007 Current Current Congressional Approp. Approp. Request $ % Discretionary Summary By Organization National Security Weapons................................................................................. 6,625,542 6,369,597 6,407,889 +38,292 +0.6% Defense Nuclear Nonproliferation.......................................... 1,507,966 1,614,839 1,726,213 +111,374 +6.9% Naval Reactors........................................................................ 801,437 781,605 795,133 +13,528 +1.7% Office of the Administrator...................................................... 363,350 338,450 386,576 +48,126 +14.2% Total, National Nuclear Security Administration........................ 9,298,295 9,104,491

242

FY 2009 Control Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

9 Control Table by Organization 9 Control Table by Organization (dollars in thousands - OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Organization National Security Weapons................................................................................. 6,258,583 6,297,466 6,618,079 +320,613 +5.1% Defense Nuclear Nonproliferation........................................... 1,824,202 1,335,996 1,247,048 -88,948 -6.7% Naval Reactors....................................................................... 781,800 774,686 828,054 +53,368 +6.9% Office of the Administrator...................................................... 358,291 402,137 404,081 +1,944 +0.5% Total, National Nuclear Security Administration.......................

243

FY 2005 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Congressional Budget Congressional Budget Request Laboratory Tables Preliminary Department of Energy FY 2005 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2004 Laboratory Tables Preliminary Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Office of Management, Budget and Evaluation/CFO February 2004 Laboratory Tables Laboratory Tables Printed with soy ink on recycled paper Preliminary Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. include both the discretionary and mandatory funding in the budget. balances, deferrals, rescissions, or other adjustments appropria ted as offsets to the DOE appropriations by the Congress.

244

FY 2011 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE/CF-0047 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy FY 2011 Congressional Budget Request February 2010 Office of Chief Financial Officer Volume 1 DOE/CF-0047 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Department of Energy FY 2011 Congressional Budget Request Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration FY 2011 Congressional Budget

245

FY 2013 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2011 FY 2012 FY 2013 Current Enacted Congressional Approp. Approp. * Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy........................................ 1,771,721 1,809,638 2,337,000 +527,362 +29.1% Electricity delivery and energy reliability......................................... 138,170 139,103 143,015 +3,912 +2.8% Nuclear energy................................................................................ 717,817 765,391 770,445 +5,054 +0.7% Fossil energy programs Clean coal technology.................................................................. -16,500 -- --

246

FY 2009 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy.......................... -- 1,722,407 1,255,393 -467,014 -27.1% Electricity delivery and energy reliability........................... -- 138,556 134,000 -4,556 -3.3% Nuclear energy................................................................. -- 961,665 853,644 -108,021 -11.2% Legacy management........................................................ -- 33,872 -- -33,872 -100.0% Energy supply and conservation Operation and maintenance..........................................

247

FY 2013 Volume I  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE/CF-0071 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 1 DOE/CF-0071 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration Page 1 FY 2013 Congressional Budget

248

The mixed waste management facility, FY95 plan  

SciTech Connect (OSTI)

This document contains the Fiscal Year 1995 Plan for the Mixed Waste Management Facility (MWMF) at Lawrence Livermore National Laboratory. Major objectives to be completed during FY 1995 for the MWMF project are listed and described. This report also contains a budget plan, project task summaries, a milestone control log, and a responsibility assignment matrix for the MWMF project.

Streit, R.

1994-12-01T23:59:59.000Z

249

FY 2008 Sandia Corporation PER Summary | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Sandia Corporation PER Summary | National Nuclear Security Sandia Corporation PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2008 Sandia Corporation PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2008 Sandia Corporation PER Summary FY 2008 Sandia Corporation PER Summary

250

FY 2007 Sandia Corporation PER Summary | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Sandia Corporation PER Summary | National Nuclear Security Sandia Corporation PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 Sandia Corporation PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 Sandia Corporation PER Summary FY 2007 Sandia Corporation PER Summary

251

FY 2012 Lawrence Livermore National Security, LLC, PEP | National Nuclear  

National Nuclear Security Administration (NNSA)

PEP | National Nuclear PEP | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 Lawrence Livermore National Security, LLC, PEP Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2012 Lawrence Livermore National Security, LLC, PEP FY 2012 Lawrence Livermore National Security, LLC, PEP

252

FY 2011 Sandia Corporation PER Summary | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Sandia Corporation PER Summary | National Nuclear Security Sandia Corporation PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2011 Sandia Corporation PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2011 Sandia Corporation PER Summary FY 2011 Sandia Corporation PER Summary

253

FY 2009 Sandia Corporation PER Summary | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Sandia Corporation PER Summary | National Nuclear Security Sandia Corporation PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2009 Sandia Corporation PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2009 Sandia Corporation PER Summary FY 2009 Sandia Corporation PER Summary

254

FY 2012 National Security Technologies, LLC, PEP | National Nuclear  

National Nuclear Security Administration (NNSA)

PEP | National Nuclear PEP | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 National Security Technologies, LLC, PEP Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2012 National Security Technologies, LLC, PEP FY 2012 National Security Technologies, LLC, PEP

255

Microsoft PowerPoint - Congressional Request Cover pages FY 2014  

Broader source: Energy.gov (indexed) [DOE]

7 7 Volume 4 Department of Energy FY 2014 Congressional Budget Request Science Science Advanced Research Projects Agency Energy (ARPA E) Agency - Energy (ARPA-E) April 2013 Office of Chief Financial Officer Volume 4 DOE/CF-0087 Volume 4 Department of Energy FY 2014 Congressional Budget Request Science Science Advanced Research Projects Agency Energy (ARPA E) Agency - Energy (ARPA-E) April 2013 Office of Chief Financial Officer Volume 4 Science Advanced Research Projects Agency- Energy Science Advanced Research Projects Agency- Energy Volume 4 Table of Contents Section Appropriation Account Summary .......................................................................................................... AP Science .................................................................................................................................................... SC

256

FY 2011 State Table  

Broader source: Energy.gov (indexed) [DOE]

State Tables State Tables Department of Energy FY 2011 Congressional Budget Request DOE/CF-0054 March 2010 Office of Chief Financial Officer State Tables Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Department of Energy FY 2011 Congressional Budget Request DOE/CF-0054 State Index Page Number FY 2011 Congressional Budget 1/29/2010 Department Of Energy (Dollars In Thousands) 6:34:40AM Page 1 of 2 FY 2009 Appropriation

257

FY 2010 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2008 FY 2009 FY 2009 FY 2010 Current Current Current Congressional Approp. Approp. Recovery Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy....................................... 1,704,112 2,178,540 16,800,000 2,318,602 +140,062 +6.4% Electricity delivery and energy reliability........................................ 136,170 137,000 4,500,000 208,008 +71,008 +51.8% Nuclear energy.............................................................................. 960,903 792,000 -- 761,274 -30,726 -3.9% Legacy management..................................................................... 33,872 -- -- --

258

FY 2012 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

2Statistical Table by Appropriation 2Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2010 FY 2011 FY 2011 FY 2012 Current Congressional Annualized Congressional Approp. Request CR Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy....................................... 2,216,392 2,355,473 2,242,500 3,200,053 +983,661 +44.4% Electricity delivery and energy reliability........................................ 168,484 185,930 171,982 237,717 +69,233 +41.1% Nuclear energy............................................................................. 774,578 824,052 786,637 754,028 -20,550 -2.7% Fossil energy programs Fossil energy research and development................................... 659,770 586,583 672,383 452,975

259

FY 2006 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Laboratory Tables Laboratory Tables Preliminary Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 Laboratory Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Laboratory / Facility Index FY 2006 Congressional Budget Page 1 of 3 (Dollars In Thousands) 3:43:16PM Department Of Energy 1/27/2005 Page Number FY 2004 Comp/Approp FY 2005 Comp/Approp

260

FY 2007 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

5 5 DOE/CF-006 Volume 5 Environmental management Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 5 DOE/CF-006 Volume 5 Printed with soy ink on recycled paper Environmental management Department of Energy/ Environmental Management FY 2007 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary .........................................................................................................3 Overview................................................................................................................................................5 Defense Environmental Cleanup Appropriation Cleanup .................................................................107 Carlsbad

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

FY 2009 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/CF-027 Volume 4 Science February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 4 DOE/CF-027 Volume 4 Science Printed with soy ink on recycled paper Department of Energy/ Science FY 2009 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary.............................................................................................................3 Appropriation Language ...........................................................................................................................5 Overview...................................................................................................................................................7 Funding by Site

262

FY 2008 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

5 5 DOE/CF-018 Volume 5 Environmental Management Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 5 DOE/CF-018 Volume 5 Environmental Management Printed with soy ink on recycled paper Department of Energy/ Environmental Management FY 2008 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary.............................................................................................................3 Strategic Overview....................................................................................................................................5 Overview...................................................................................................................................................7

263

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

264

National Renewable Energy Laboratory 10 Year Site Plan FY 2007...  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10...

265

EERE FY 2016 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

EERE FY 2016 Budget Request, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

266

U.S. Global Change Research Program FY 2013 Budget Request (in millions)  

E-Print Network [OSTI]

U.S. Global Change Research Program FY 2013 Budget Request (in millions) USGCRP FY 2012 Estimate FY.0% Agriculture 83 86 3.6% USGS 59 68 15.3% EPA 19 20 5.3% Smithsonian 8 8 flat NIH 4 4 flat DOT 1 3 200.0% Total USGCRP 2,427 2,563 5.6% The President's budget request includes $2.6 billion for the U.S. Global Change

267

273.6 279.2 279.5 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11  

E-Print Network [OSTI]

, reconstruction and simulation software tools and adjustments to the IceCube Live experiment control interface ANALYSIS CAPABILITY DETERMINE FULL DEPLOYMENT RATE COMPLETE EHWD INTEGRATION & TEST ___Total Funds (US Re-Plan. Major activities during the final year of construction are: project closeout, documentation

Saffman, Mark

268

Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010  

Broader source: Energy.gov (indexed) [DOE]

Combined Fiscal Year (FY) 2009 Annual Performance Results and FY Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2009 actual performance and FY 2010 planned activities. Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan More Documents & Publications U.S. Departmetn of Energy, Office of Inspector General, Annaul Peformance Report FY 2009, Annual Performance Plan Fy 2010 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012

269

Tanks Focus Area (TFA) Site Needs Assessment FY 1999  

SciTech Connect (OSTI)

This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by five major U.S. Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), Savannah River Site (SRS), and West Valley Demonstration Project (WVDP). This is the fifth edition of the TFA site needs assessment. As with previous editions, this edition serves to provide the basis for accurately defining the TFA program for the upcoming fiscal year (FY), and adds definition to the program for up to 4 additional outyears. Therefore, this version distinctly defines the FY 2000 progrti and adds further definition to the FY 2001- FY 2004 program. Each year, the TFA reviews and amends its program in response to site users' science and technology needs.

RW Allen

1999-05-03T23:59:59.000Z

270

Analytical Chemistry Laboratory progress report for FY 1999  

SciTech Connect (OSTI)

This report summarizes the activities of the Analytical Chemistry Laboratory (ACL) at Argonne National Laboratory (ANL) for Fiscal Year (FY) 1999 (October 1998 through September 1999). This annual progress report, which is the sixteenth in this series for the ACL, describes effort on continuing projects, work on new projects, and contributions of the ACL staff to various programs at ANL.

Green, D. W.; Boparai, A. S.; Bowers, D. L.; Graczyk, D. G.

2000-06-15T23:59:59.000Z

271

Analytical Chemistry Laboratory progress report for FY 1998.  

SciTech Connect (OSTI)

This report summarizes the activities of the Analytical Chemistry Laboratory (ACL) at Argonne National Laboratory (ANL) for Fiscal Year (FY) 1998 (October 1997 through September 1998). This annual progress report, which is the fifteenth in this series for the ACL, describes effort on continuing projects, work on new projects, and contributions of the ACL staff to various programs at ANL.

Boparai, A. S.; Bowers, D. L.; Graczyk, D. G.; Green, D. W.; Lindahl, P. C.

1999-03-29T23:59:59.000Z

272

FY 2012 Summary Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

5 5 Department of Energy Budget by Organization (discretionary dollars in thousands) FY 2010 FY 2011 FY 2011 FY 2012 Current Cong. Annualized Cong. Approp. Request CR Request $ % National Security Weapons Activities* 6,386,371 7,008,835 7,008,835 7,629,716 +620,881 +8.9% Defense Nuclear Nonproliferation* 2,131,382 2,687,167 2,136,709 2,549,492 -137,675 -5.1% Naval Reactors* 945,133 1,070,486 945,133 1,153,662 +83,176 +7.8% Office of the Administrator* 410,754 448,267 410,754 450,060 +1,793 +0.4% Total, National Nuclear Security Administration* 9,873,640 11,214,755 10,501,431 11,782,930 +568,175 +5.1% Energy and Environment Energy Efficiency and Renewable Energy 2,216,392 2,355,473 2,242,500 3,200,053 +983,661 +44.4% Electricity Delivery and Energy Reliability 168,484 185,930 171,982 237,717 +69,233 +41.1%

273

FY 2013 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

8 8 Department of Energy FY 2013 Congressional Budget Request Laboratory Tables y Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0078 Department of Energy FY 2013 Congressional Budget Request Laboratory Tables P li i Preliminary h b d i d i hi d h l l f b d h i f h The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. February 2012 Office of Chief Financial Officer Printed with soy ink on recycled paper Laboratory / Facility Index FY 2013 Congressional Budget

274

FY 2011 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

Laboratory Tables Laboratory Tables Department of Energy FY 2011 Congressional Budget Request DOE/CF-0055 March 2010 Office of Chief Financial Officer Laboratory Tables Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. Department of Energy FY 2011 Congressional Budget Request DOE/CF-0055 Laboratory / Facility Index FY 2011 Congressional Budget Page 1 of 3 (Dollars In Thousands) 6:24:57AM Department Of Energy 1/29/2010 Page

275

FY 2013 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 Volume 2 f Department of Energy FY 2013 Congressional B d R Budget Request Other Defense Activities Departmental Administration Inspector General Working Capital F nd Working Capital Fund Safeguards and Security Crosscut Pensions February 2012 Office of Chief Financial Officer Volume 2 DOE/CF-0072 Volume 2 f Department of Energy FY 2013 Congressional B d R Budget Request Other Defense Activities Departmental Administration Inspector General Working Capital F nd Working Capital Fund Safeguards and Security Crosscut Pensions February 2012 Office of Chief Financial Officer Volume 2 Printed with soy ink on recycled paper Department of Energy/ Volume 2 FY 2013 Congressional Budget Volume 2 Table of Contents Page Appropriation Account Summary .............................................................................................................3

276

FY 2012 Laboratory Table  

Broader source: Energy.gov (indexed) [DOE]

5 5 Department of Energy FY 2012 Congressional Budget Request Laboratory Tables y Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0065 Department of Energy FY 2012 Congressional Budget Request Laboratory Tables P li i Preliminary h b d i d i hi d h l l f b d h i f h The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. February 2012 Office of Chief Financial Officer Printed with soy ink on recycled paper Laboratory / Facility Index FY 2012 Congressional Budget

277

FY 2005 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

4 4 Volume 3 February 2004 Volume 3 Office of Management, Budget and Evaluation/CFO Energy Supply Energy Supply Energy Efficiency and Renewable Energy Energy Efficiency and Renewable Energy Electric Transmission and Distribution Electric Transmission and Distribution Nuclear Energy Nuclear Energy Civilian Radioactive Waste Management Civilian Radioactive Waste Management Environment, Safety & Health Environment, Safety & Health Future Liabilities Future Liabilities Legacy Management Legacy Management Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0034 Volume 3 Energy Supply Energy Supply Energy Efficiency and Renewable Energy Energy Efficiency and Renewable Energy Electric Transmission and Distribution

278

FY 2007 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

Chief Financial Officer Chief Financial Officer Volume 1 DOE/CF-002 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 1 DOE/CF-002 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration FY 2007 Congressional Budget

279

FY 2010 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

5 5 DOE/CF-039 Volume 5 Environmental Management Defense Nuclear Waste Disposal Nuclear Waste Disposal May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 5 DOE/CF-039 Volume 5 Environmental Management Defense Nuclear Waste Disposal Nuclear Waste Disposal Printed with soy ink on recycled paper Environmental Management Defense Nuclear Waste Disposal Nuclear Waste Disposal Environmental Management Defense Nuclear Waste Disposal Nuclear Waste Disposal Department of Energy FY 2010Congressional Budget Environmental Management/ Defense Nuclear Waste/Nuclear Waste Disposal Volume 5 Table of Contents Page Appropriation Account Summary.............................................................................................................3

280

FY 2009 Summary Report  

Broader source: Energy.gov (indexed) [DOE]

of Performance and financial information FY 2009 DOE/CF-0045 The Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports in order to provide performance, financial and related information in a more meaningful and useful format. In accordance with the Act, the Department of Energy (Department or DOE), has produced a consolidated Performance and Accountability Report (PAR) in previous years. For fiscal year (FY) 2009, the Department has chosen to produce an alternative report to the consolidated PAR and will produce an Agency Financial Report, an Annual Performance Report and a Summary of Performance and Financial

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

FY 2013 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

6 6 Volume 6 Department of Energy FY 2013 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration February 2012 Office of Chief Financial Officer Volume 6 DOE/CF-0076 Volume 6 Department of Energy FY 2013 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration February 2012 Office of Chief Financial Officer Volume 6 Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration Western Area Power Administration

282

FY 2007 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/CF-005 Volume 4 Science Nuclear waste disposal Defense nuclear waste disposal Departmental administration Inspector general Working capital fund Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 4 DOE/CF-005 Volume 4 Printed with soy ink on recycled paper Science Nuclear waste disposal Defense nuclear waste disposal Departmental administration Inspector general Working capital fund Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Working Capital Fund Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Working Capital Fund Department of Energy FY 2007 Congressional Budget Volume 4 Table of Contents

283

FY 2008 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE/CF-014 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 1 DOE/CF-014 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration FY 2008 Congressional Budget Volume 1 Table of Contents

284

FY 2005 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

6 6 Volume 5 Environmental Management Environmental Management Defense Site Acceleration Completion Defense Site Acceleration Completion Defense Environmental Services Defense Environmental Services Non Non - - Defense Site Acceleration Completion Defense Site Acceleration Completion Non Non - - Defense Environmental Services Defense Environmental Services Uranium Enrichment Decontamination Uranium Enrichment Decontamination and Decommissioning Fund and Decommissioning Fund February 2004 Volume 5 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Environmental Management Environmental Management Defense Site Acceleration Completion Defense Site Acceleration Completion

285

FY 2010 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE/CF-035 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 1 DOE/CF-035 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration FY 2010 Congressional Budget Volume 1 Table of Contents Page Appropriation Account Summary.............................................................................................................3

286

FY 2005 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

8 8 Volume 7 Interior & Related Agencies Interior & Related Agencies Fossil Energy Research & Development Fossil Energy Research & Development Naval Petroleum & Oil Shale Reserves Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Elk Hills School Lands Fund Energy Conservation Energy Conservation Economic Regulation Economic Regulation Strategic Petroleum Reserve Strategic Petroleum Reserve Energy Information Administration Energy Information Administration Clean Coal Technology Clean Coal Technology February 2004 Volume 7 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Interior & Related Agencies Interior & Related Agencies

287

FY 2012 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

9 9 Volume 3 Department of Energy FY 2012 Congressional Budget Request Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Energy Transformation Acceleration Fund Energy Transformation Acceleration Fund Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Ultra-Deepwater Unconventional Natural Gas February 2011 Office of Chief Financial Officer Volume 3 Printed with soy ink on recycled paper Department of Energy/ Volume 3 FY 2012 Congressional Budget Volume 3 Table of Contents Page Appropriation Account Summary .............................................................................................................3

288

FY 2005 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

2 2 Volume 1 February 2004 Volume 1 National Nuclear Security Administration National Nuclear Security Administration Office of the Administrator Office of the Administrator Weapons Activities Weapons Activities Defense Nuclear Nonproliferation Defense Nuclear Nonproliferation Naval Reactors Naval Reactors Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0032 Volume 1 February 2004 Volume 1 Office of Management, Budget and Evaluation/CFO Printed with soy ink on recycled paper National Nuclear Security Administration National Nuclear Security Administration Office of the Administrator Office of the Administrator Weapons Activities Weapons Activities Defense Nuclear Nonproliferation

289

FY 2009 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

1 1 DOE/CF-024 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 1 DOE/CF-024 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration FY 2009 Congressional Budget Volume 1 Table of Contents

290

FY 2005 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

7 7 Volume 6 Power Marketing Administrations Power Marketing Administrations Southeastern Power Administration Southeastern Power Administration Southwestern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration Bonneville Power Administration February 2004 Volume 6 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0037 Volume 6 Power Marketing Administrations Power Marketing Administrations Southeastern Power Administration Southeastern Power Administration Southwestern Power Administration Southwestern Power Administration Western Area Power Administration

291

FY 2010 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

3 3 DOE/CF-037 Volume 3 Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Energy Transformation Acceleration Fund Nuclear Energy May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 3 DOE/CF-037 Volume 3 Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Energy Transformation Acceleration Fund Nuclear Energy Printed with soy ink on recycled paper Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Energy Transformation Acceleration Fund Nuclear Energy Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Energy Transformation Acceleration Fund Nuclear Energy Department of Energy/ Volume 3 FY 2010 Congressional Budget

292

FY 2012 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

8 8 Volume 2 f Department of Energy FY 2012 Congressional B d R Budget Request Other Defense Activities Other Defense Activities Departmental Administration Inspector General Advanced Technology Vehicles Manufacturing Loan Program Title 17 Innovative Technology Loan Guarantee Program Better Building Pilot Loan Guarantee Initiative for Universities Schools and Hospitals Universities, Schools, and Hospitals Working Capital Fund Energy Information Administration Safeguards and Security Crosscut February 2011 Office of Chief Financial Officer Volume 2 g y Pensions Printed with soy ink on recycled paper Department of Energy/ Volume 2 FY 2012 Congressional Budget Volume 2 Table of Contents Page Appropriation Account Summary .............................................................................................................3

293

FY 2011 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 DOE/CF-0048 Volume 2 Other Defense Activities Departmental Administration Inspector General Advanced Technology Vehicles Manufacturing Loan Program Title 17 Innovative Technology Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut Domestic Utility Fee Pensions Department of Energy FY 2011 Congressional Budget Request February 2010 Office of Chief Financial Officer Volume 2 DOE/CF-0048 Volume 2 Other Defense Activities Departmental Administration Inspector General Advanced Technology Vehicles Manufacturing Loan Program Title 17 Innovative Technology Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut Domestic Utility Fee Pensions Department of Energy FY 2011 Congressional

294

FY 2006 Summary Table by Appropriation  

Broader source: Energy.gov (indexed) [DOE]

Appropriation Account Summary Appropriation Account Summary (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Energy And Water Development Energy Programs Energy supply....................................................................... Non-Defense site acceleration completion........................... Uranium enrichment D&D fund............................................ Non-Defense environmental services................................... Science................................................................................. Nuclear waste disposal......................................................... Departmental administration.................................................

295

USDA Section 9006 Program: Status and Energy Benefits of Grant Awards in FY 2003-2005  

SciTech Connect (OSTI)

At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.

Walters, T.; Savage, S.; Brown, J.

2006-08-01T23:59:59.000Z

296

Confederated Tribes of the Umatilla Indian Reservation North Fork John Day River Basin Anadromous Fish Enhancement Project, Annual Report for FY 2000.  

SciTech Connect (OSTI)

The CTUIR North Fork John Day River Basin Anadromous Enhancement Project (NFJDAFEP) identified and prioritized stream reaches in The North Fork John day River basin for habitat improvements during the 2000 project period. Public out reach was emphasized during this first year of the project. We presented multiple funding and enhancement options to landowners. We concentrated on natural recovery methods, riparian fencing and off-stream livestock water developments. Under this BPA contract four riparian easements were signed protecting almost 5 miles of tributary streams. There are nine offstream water developments associated with these easements. Some landowners chose to participate in other programs based on Tribal outreach efforts. Two landowners chose NRCS programs for enhancement and one chose OWEB as a funding source. Two landowners implemented there own enhancement measures protecting 3 miles of stream. Cooperation between the NRCS/FSA/SWCDs and the Tribe to create joint projects and develop alternative funding scenarios for riparian enhancement was a major effort. The Tribe also worked with the North Fork John Day Watershed Council, USFS and ODFW to coordinate projects and support similar projects throughout the John Day Basin. We provided input to the John Day Summary prepared for the NWPPC by ODFW. The Tribe worked with the Umatilla National Forest on the Clear Creek Dredgetailings Rehabilitation project and coordinated regularly with USFS Fisheries, Hydrology and Range staff.

Macy, Tom L.; James, Gary A.

2003-03-01T23:59:59.000Z

297

Confederated Tribes of the Umatilla Indian Reservation North Fork John Day River Basin Anadromous Fish Enhancement Project, Annual Report for FY 2001.  

SciTech Connect (OSTI)

The CTUIR North Fork John Day River Basin Anadromous Enhancement Project (NFJDAFEP) identified and prioritized stream reaches in The North Fork John day River basin for habitat improvements during the 2000 project period. Public outreach was emphasized during this first year of the project. During the past year we concentrated on satisfying landowner needs, providing cost share alternatives, providing joint projects and starting implementation. We presented multiple funding and enhancement options to landowners. We concentrated on natural recovery methods, riparian fencing and offstream livestock water developments. Under this BPA contract four riparian easements have been signed protecting almost 5 miles of tributary streams. There are nine offstream water developments associated with these easements. Some landowners chose to participate in other programs based on Tribal outreach efforts. Some landowners chose NRCS programs for enhancement and others chose OWEB as a funding source. The exact amount of stream protection due to other funding sources probably exceeds that by BPA, however most would not have entered any program without initial Tribal outreach. Cooperation between the NRCS/FSA/SWCDs and the Tribe to create joint projects and develop alternative funding scenarios for riparian enhancement was a major effort. The Tribe also worked with the North Fork John Day Watershed Council, USFS and ODFW to coordinate projects and support similar projects throughout the John Day Basin.

Macy, Tom L.; James, Gary A.

2003-03-01T23:59:59.000Z

298

A Total Cost of Ownership Model for Design and Manufacturing Optimization of Fuel Cells in Stationary and Emerging Market Applications - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Max Wei (Primary Contact), Tom McKone, Tim Lipman 1 , David Dornfeld 2 , Josh Chien 2 , Chris Marnay, Adam Weber, Paul Beattie 3 , Patricia Chong 3 Lawrence Berkeley National Laboratory (LBNL) 1 Cyclotron Road MS 90R-4000 Berkeley, CA 94706 Phone: (510) 486-5220 Email: mwei@lbl.gov DOE Manager HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov Subcontractors: 1 University of California, Berkeley, Transportation Sustainability Research Center and DOE Pacific Region Clean Energy Application Center, Berkeley, CA 2 University of California, Berkeley, Laboratory for Manufacturing and Sustainability, Department of Mechanical Engineering, Berkeley, CA

299

FY 2007 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

DOE/CF-009 DOE/CF-009 Budget highlights Department of Energy FY 2007 Congressional Budget Request February 2006 Printed with soy ink on recycled paper Budget highlights Office of Chief Financial Officer DOE/CF-009 Table of Contents INTRODUCTION ......................................................................................................................................1 BUDGET BY ORGANIZATION ..............................................................................................................17 BUDGET BY APPROPRIATION ............................................................................................................18 SECTION 1. DEFENSE STRATEGIC GOAL........................................................................................19

300

FY 2006 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

DOE/ME-0053 DOE/ME-0053 Budget Highlights Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 DOE/ME-0053 Budget Highlights Printed with soy ink on recycled paper Table of Contents INTRODUCTION............................................................................................................................ 1 BUDGET BY ORGANIZATION...................................................................................................... 15 BUDGET BY APPROPRIATION.................................................................................................... 16 FUNDING BY GOALS .................................................................................................................. 17 SECTION 1. DEFENSE STRATEGIC GOAL.................................................................................

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

FY 2012 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

2 2 Volume 6 Department of Energy FY 2012 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration February 2011 Office of Chief Financial Officer Volume 6 Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration

302

FY 2010 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

DOE/CF-042 DOE/CF-042 Budget Highlights May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request DOE/CF-042 Budget Highlights Printed with soy ink on recycled paper Table of Contents INTRODUCTION...................................................................................................................................... 1 PROGRAM HIGHLIGHTS........................................................................................................................ 5 BUDGET BY ORGANIZATION .............................................................................................................. 14 BUDGET BY APPROPRIATION............................................................................................................ 15 DETAILS BY PROGRAM

303

FY 2009 Budget Highlights  

Broader source: Energy.gov (indexed) [DOE]

DOE/CF-031 DOE/CF-031 Budget Highlights February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request DOE/CF-031 Budget Highlights Printed with soy ink on recycled paper Table of Contents INTRODUCTION...................................................................................................................................... 1 BUDGET BY ORGANIZATION .............................................................................................................. 21 BUDGET BY APPROPRIATION............................................................................................................ 22 SECTION 1. ENERGY SECURITY.......................................................................................................

304

FY2012 LBNL LDRD Annual Report (PUB)  

E-Print Network [OSTI]

8450, p36. LDRD FY2012 Annual Report [Publications List] 119Light LDRD FY2012 Annual Report [Publications List] 95List] LDRD FY2012 Annual Report depletion of branched and

Ho, Darren

2014-01-01T23:59:59.000Z

305

Tanks focus area multiyear program plan - FY96-FY98  

SciTech Connect (OSTI)

The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

NONE

1995-07-01T23:59:59.000Z

306

Annual Performance Report FY 2011 Annual Performance Plan FY 2012  

Broader source: Energy.gov (indexed) [DOE]

Annual Performance Report FY 2011 Annual Performance Plan FY 2012 2 FY 2011 OIG Performance Results The OIG measures its performance against long-term and annual goals set forth in OIG planning documents. During this reporting period, the OIG successfully achieved its FY 2011 performance goals. The following are the specific results: Goal 1 Promote Presidential Reform Initiatives, Secretarial Mission Priorities, and Congress Objective 1: Conduct reviews seeking positive change in the Department relating to the implementation of Presidential Reform Initiatives, the Secretary's Mission Priorities, and the OIG-identified Management Challenges. Performance Measures: Accomplishments

307

FY 2008 & FY 2009 Annual Uncosted Balances Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Uncosted Balances Reports » FY 2008 & FY 2009 Uncosted Balances Reports » FY 2008 & FY 2009 Annual Uncosted Balances Report FY 2008 & FY 2009 Annual Uncosted Balances Report This report presents a combined presentation and analysis of the Department's uncosted balances for FY 2008 and FY 2009. In FY 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) provided the Department an additional $36.7 billion of funding. The FY 2009 uncosted balances associated with Recovery Act funding are separately presented but are not included in the additional analysis of uncosted balances in this report. FY 2008-2009 Report on Uncosted Balances More Documents & Publications FY 2010 Annual Uncosted Balances Report FY 2011 Annual Uncosted Balances Report FY 2012 Annual Uncosted Balances

308

Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1  

SciTech Connect (OSTI)

The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

Not Available

1994-09-01T23:59:59.000Z

309

Fossil Energy FY 2015 Budget in Brief  

Broader source: Energy.gov [DOE]

Fossil Energy FY 2015 Budget in Brief document gives highlights to the budget request for the FY 2015 budget request for the Office of Fossil Energy.

310

FY 2007 Summary Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

5 5 FY 2006 FY 2007 Current Current Congressional Approp. Approp. Request $ % Discretionary Summary By Organization National Security Weapons................................................................................ 6,625,542 6,369,597 6,407,889 +38,292 +0.6% Defense Nuclear Nonproliferation.......................................... 1,507,966 1,614,839 1,726,213 +111,374 +6.9% Naval Reactors....................................................................... 801,437 781,605 795,133 +13,528 +1.7% Office of the Administrator...................................................... 363,350 338,450 386,576 +48,126 +14.2% Total, National Nuclear Security Administration...................... 9,298,295 9,104,491 9,315,811 +211,320 +2.3% Energy, Science and Environment

311

FY 2009 Summary Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

7 7 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Organization National Security Weapons................................................................................. 6,258,583 6,297,466 6,618,079 +320,613 +5.1% Defense Nuclear Nonproliferation........................................... 1,824,202 1,335,996 1,247,048 -88,948 -6.7% Naval Reactors....................................................................... 781,800 774,686 828,054 +53,368 +6.9% Office of the Administrator...................................................... 358,291 402,137 404,081 +1,944 +0.5% Total, National Nuclear Security Administration....................... 9,222,876 8,810,285 9,097,262 +286,977 +3.3% Energy and Environment

312

FY 2008 Summary Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

6 6 FY 2007 FY 2008 Current Congressional Congressional Approp. Request Request $ % Discretionary Summary By Organization National Security Weapons......................................................................... 6,355,297 6,407,889 6,511,312 +103,423 +1.6% Defense Nuclear Nonproliferation.................................... 1,619,179 1,726,213 1,672,646 -53,567 -3.1% Naval Reactors................................................................ 781,605 795,133 808,219 +13,086 +1.6% Office of the Administrator............................................... 354,223 386,576 394,656 +8,080 +2.1% Total, National Nuclear Security Administration.................. 9,110,304 9,315,811 9,386,833 +71,022 +0.8% Energy and Environment Energy Energy Efficiency and Renewable Energy....................

313

The FY 2005 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

This presentation provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2005 budget request to Congress.

314

The FY 2006 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE)

This presentation provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2005 budget request to Congress.

315

FY 2005 State Table  

Broader source: Energy.gov (indexed) [DOE]

Office of Management, Budget Office of Management, Budget and Evaluation/CFO February 2004 State Tables State Tables Preliminary Preliminary Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Office of Management, Budget and Evaluation/CFO February 2004 State Tables State Tables Printed with soy ink on recycled paper Preliminary Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. State Index Page Number

316

FY 2012 State Table  

Broader source: Energy.gov (indexed) [DOE]

6 6 Department of Energy FY 2012 Congressional Budget Request State Tables P li i Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0066 Department of Energy FY 2012 Congressional Budget Request State Tables P li i Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. February 2012 Office of Chief Financial Officer Printed with soy ink on recycled

317

FY06 AR  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ACCOMPLISHMENTS ACCOMPLISHMENTS NETL Accomplishments FY 2006 2 NETL Accomplishments FY 2006 3 MESSAGE FROM THE DIRECTOR For 200 years, America's energy demands have grown at a remarkable rate. As we have moved from an agricultural society, through industrial expansion, and into the current technological era, our society's transformation has depended on reliable, affordable energy supplies. Energy reliance is not limited to the United States. The worldwide need for on-demand electricity, modern transportation, and industrial power is driving a steep rise in global energy consumption. By 2030, we will collectively consume nearly double the energy we use today. In this climate, U.S. energy security is critical. It demands our extracting the maximum available energy from

318

FY 2008 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

3 3 DOE/CF-016 Volume 3 Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 3 DOE/CF-016 Volume 3 Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Printed with soy ink on recycled paper Energy Supply Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Energy Supply Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Department of Energy/ Energy Supply and Conservation FY 2008 Congressional Budget

319

FY 2008 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 DOE/CF-015 Volume 2 Other Defense Activities Health, Safety and Security Legacy Management Nuclear Energy Defense-Related Administrative Support Hearings and Appeals Safeguards and Security Crosscut Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 2 DOE/CF-015 Volume 2 Other Defense Activities Health, Safety and Security Legacy Management Nuclear Energy Defense-Related Administrative Support Hearings and Appeals Safeguards and Security Crosscut Printed with soy ink on recycled paper Other Defense Activities Safeguards and Security Crosscut Other Defense Activities Safeguards and Security Crosscut Department of Energy/ Other Defense Activities FY 2008 Congressional Budget Volume 2 Table of Contents Page

320

FY 2006 Volume 1  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of Management, Budget and Evaluation/CFO Volume 1 February 2005 DOE/ME-0046 Volume 1 Department of Energy FY 2006 Congressional Budget Request National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of Management, Budget and Evaluation/CFO Volume 1 February 2005 DOE/ME-0046 Volume 1 Printed with soy ink on recycled paper Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy/ National Nuclear Security Administration FY 2006 Congressional Budget

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Accelerator/Experiment Operations - FY01 through FY03  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

230 230 January 2004 Accelerator/Experiment Operations - FY 2001 Through FY 2003 J. Conrad, D. Denisov, S. Holmes, M. Lindgren, W. Louis, R. Roser Edited by J. Appel This Technical Memorandum (TM) summarizes the accelerator and experiment operations for the period FY 2001 through FY 2003. The plan is to have an annual TM to gather such information in one place. In this case, the information concerns the startup of Run II at the Tevatron Collider and the beginning of the MiniBooNE neutrino experiment. While the focus is on the FY 2003 efforts, this document includes summaries of the earlier years where available for completeness. Each section was prepared by the relevant authors, and was somewhat edited for uniformity for inclusion in this summary.

322

FY 1992 work plan and technical progress reports  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

NONE

1992-11-01T23:59:59.000Z

323

Selection of deposystem for heterogeneity research. Status report. Project BE1, Task 1, Milestone B in FY86 annual plan dated April 1986  

SciTech Connect (OSTI)

Five criteria were established for selecting a depositional environment to analyze to develop a methodology for constructing quantitative models of reservoir heterogeneities. The criteria are (1) the deposystem is an economically important oil reservoir, (2) reservoirs comprised of the deposystem are EOR candidates, (3) the productive formation is exposed near a producing field, (4) subsurface data for the producing field are available to NIPER, and (5) the producing field has an EOR project. Two depositional environments satisfy these criteria: barrier island/strandplain and shelf sand ridge deposits. Results of a survey of 77 fields producing from barrier island/strandplain deposits and 22 from shelf deposits indicate that six barrier fields and two shelf fields are US giant oilfields (ultimate recovery >100 million barrels). Ultimate recoveries from two fields producing from combined barrier island strandplain deposits have been estimated at >500 million barrels. EOR projects have been conducted in 22 barrier island strandplain reservoirs and 4 shelf reservoirs. Residual oil saturation after primary and secondary recovery in the eight barrier/strandplain reservoirs sampled, ranges from 31.5 to 55%, averaging 38.7%. Insufficient data exist for shelf sand ridge reservoirs to obtain comparative figures. These depositional environments also satisfy the above-mentioned criteria 3 to 5. Bell Creek field produces from a barrier island/strandplain deposit which crops out nearby. Subsurface data and data on two micellar-polymer pilot projects implemented in the field are available in Department of Energy reports. Teapot Dome (NPR-3) produces from a shelf sand ridge deposit which is exposed 5 miles from the reservoir. The final selection of a reservoir for study will be submitted in a status report due September 30, 1986. 10 refs., 1 fig., 5 tabs.

Jackson, S.R.

1986-06-01T23:59:59.000Z

324

E-Print Network 3.0 - america fy09 activities Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cash Balance... ,955.82 12;FY09 Category Departm ent Vendor Location Item description Cost Quantity Total A. 252... ,622.00 Hardware ... Source: Iowa State University, Office...

325

FY 2012 Highlighted Sustainable Targets and Initiatives | Department...  

Energy Savers [EERE]

FY 2012 Highlighted Sustainable Targets and Initiatives FY 2012 Highlighted Sustainable Targets and Initiatives Joint Environmental Management System (EMS) Goals FY 2012...

326

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

327

FY 2013 Conference Waiver - Emergency Management Issues Special...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FY 2013 Conference Waiver - Emergency Management Issues Special Interest Group FY 2013 Conference Waiver - Emergency Management Issues Special Interest Group FY 2013 Conference...

328

Fuel Cell Technologies Program FY 2013 Budget Request Rollout...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Program FY 2013 Budget Request Rollout to Stakeholders Fuel Cell Technologies Program FY 2013 Budget Request Rollout to Stakeholders Presentation by Sunita Satyapal at the FY 2013...

329

FY 2011 National Security Technologies, LLC, PER Summary | National Nuclear  

National Nuclear Security Administration (NNSA)

National Security Technologies, LLC, PER Summary | National Nuclear National Security Technologies, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2011 National Security Technologies, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2011 National Security Technologies, LLC, PER

330

FY 2011 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary |  

National Nuclear Security Administration (NNSA)

Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2011 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2011 Honeywell Federal Manufacturing &

331

FY 2012 Lawrence Livermore National Security, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

PER Summary | National PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 Lawrence Livermore National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2012 Lawrence Livermore National Security, LLC, ...

332

FY 2010 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary |  

National Nuclear Security Administration (NNSA)

Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2010 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2010 Honeywell Federal Manufacturing &

333

FY 2007 National Security Technologies, LLC, PER Summary | National Nuclear  

National Nuclear Security Administration (NNSA)

National Security Technologies, LLC, PER Summary | National Nuclear National Security Technologies, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 National Security Technologies, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 National Security Technologies, LLC, PER

334

FY 2007 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary |  

National Nuclear Security Administration (NNSA)

Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 Honeywell Federal Manufacturing &

335

FY 2009 National Security Technologies, LLC, PER Summary | National Nuclear  

National Nuclear Security Administration (NNSA)

National Security Technologies, LLC, PER Summary | National Nuclear National Security Technologies, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2009 National Security Technologies, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2009 National Security Technologies, LLC, PER

336

FY 2012 Honeywell Federal Manufacturing & Technologies, LLC, PEP | National  

National Nuclear Security Administration (NNSA)

PEP | National PEP | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 Honeywell Federal Manufacturing & Technologies, LLC, PEP Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2012 Honeywell Federal Manufacturing & Technologies, ...

337

FY 2007 Congressional Budget Request  

Broader source: Energy.gov (indexed) [DOE]

state tables state tables preliminary Department of Energy FY 2007 Congressional Budget Request February 2006 Printed with soy ink on recycled paper Office of Chief Financial Officer state tables preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the Congress. State Index Page Number FY 2007 Congressional Budget 1/31/2006 Department Of Energy (Dollars In Thousands) 12:09:13PM Page 1 of 2 FY 2005 Appropriation FY 2006 Appropriation FY 2007 Request State Table 1 1 $32,439

338

NSLS-II Project Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NSLS-II Project Schedule NSLS-II Project Schedule Major Milestone Event Major Milestone Event Preliminary Schedule CD-0 (approve Mission Need) 4th quarter, FY2005 CD-1 (approve Alternative Selection and Cost Range) 4th quarter, FY2007 CD-2 (approve Performance Baseline) 1st quarter, FY2008 CD-3 (approve Start of Construction) 2nd quarter, FY2009 CD-4 (approve Start of Operations) FY2015 Critical Decisions The five Critical Decisions are major milestones approved by the Secretarial Acquisition Executive or Acquisition Executive that establish the mission need, recommended alternative, Acquisition Strategy, the Performance Baseline, and other essential elements required to ensure that the project meets applicable mission, design, security, and safety requirements. Each Critical Decision marks an increase in commitment of

339

OPIC US and Developmental Effects FY 2008 | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OPIC US and Developmental Effects FY 2008 OPIC US and Developmental Effects FY 2008 BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data OPIC US and Developmental Effects FY 2008 Dataset Summary Description Analysis of the project's expected impact on U.S. employment and U.S. balance of payments flows. Also includes impact analysis for each project receiving OPIC support in terms of net impact on the economic and social development of the project's host country. The analysis uses objective measurements to demonstrate the developmental impact of OPIC-supported projects. Tags {"Annual Policy Report","Foreign Assistance Act of 1961","US economic and host country development impacts","US economic effects","host country development effects","estimated economic impact",subproject,"agribusiness sector","minerals and energy sector","manufacturing sector","services sector","host country","investor procurement data","emerging market countries","financial services projects","investment guaranty","political risk insurance","OPIC loan","OPIC-supported private equity fund","OPIC-supported capital expansion","public infrastructure projects","foreign exchange benefits","foreign exchange costs","exports generated","imports replaced","capital outflows","project imports","net foreign exchange impacts"}

340

FY 2009 Annual Performance Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual Performance Reports » FY 2009 Annual Performance Annual Performance Reports » FY 2009 Annual Performance Report FY 2009 Annual Performance Report DOE's Annual Performance Report (APR) outlines the Department's performance in fiscal year 2009 against the goals that were set in the President's fiscal year 2009 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Because these measures were created before final congressional allocations, in some cases the actual appropriation levels did not match the Department's request and may have affected a program's ability to meet its planned performance level. Performance information is also presented for projects funded by the American Recovery and Reinvestment Act of 2009.

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

FY 2007 Annual Uncosted Balances Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual Uncosted Balances Reports » FY 2007 Annual Annual Uncosted Balances Reports » FY 2007 Annual Uncosted Balances Report FY 2007 Annual Uncosted Balances Report The Department faced significant challenges due to the unusually long Continuing Resolution (CR), which extended until April 2007. Under the CR the Department must act conservatively to ensure that obligations and costs are restrained in order to mitigate any negative impacts should actual appropriations differ significantly from planned and budgeted amounts. In addition, the Department is prohibited from engaging in any "new starts" for contracts or projects, which means that these activities are deferred until later in the year, thereby increasing the amount of uncosted balances at year-end since the costing cycle is, in essence, no longer on a fiscal

342

FY 2006 BWXT Pantex, LLC, PER Summary | National Nuclear Security  

National Nuclear Security Administration (NNSA)

BWXT Pantex, LLC, PER Summary | National Nuclear Security BWXT Pantex, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2006 BWXT Pantex, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2006 BWXT Pantex, LLC, PER Summary FY 2006 BWXT Pantex, LLC, PER Summary

343

FY 2010 Annual Performance Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Performance Reports » FY 2010 Annual Performance Performance Reports » FY 2010 Annual Performance Report FY 2010 Annual Performance Report Department of Energy's Annual Performance Report (APR) compares the Department's performance results for fiscal year 2010 with goals set in the President's fiscal year 2010 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Performance information is also presented for projects funded by the American Recovery and Reinvestment Act of 2009. Provides key performance information that demonstrates DOE's accountability to the American people for discovering the solutions to power and secure America's future. Documents for Download

344

FY 2009 Annual Performance Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual Performance Reports » FY 2009 Annual Performance Annual Performance Reports » FY 2009 Annual Performance Report FY 2009 Annual Performance Report DOE's Annual Performance Report (APR) outlines the Department's performance in fiscal year 2009 against the goals that were set in the President's fiscal year 2009 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Because these measures were created before final congressional allocations, in some cases the actual appropriation levels did not match the Department's request and may have affected a program's ability to meet its planned performance level. Performance information is also presented for projects funded by the American Recovery and Reinvestment Act of 2009.

345

FY 2007 BWXT Pantex, LLC, PER Summary | National Nuclear Security  

National Nuclear Security Administration (NNSA)

7 BWXT Pantex, LLC, PER Summary | National Nuclear Security 7 BWXT Pantex, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 BWXT Pantex, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 BWXT Pantex, LLC, PER Summary FY 2007 BWXT Pantex, LLC, PER Summary

346

Geothermal Materials Development, Annual Report FY 1991  

SciTech Connect (OSTI)

Advances in the development of new materials, the commercial availabilities of which are essential for the attainment of Hydrothermal Category Level I and II Objectives, continue to be made in the Geothermal Materials Development Project. Many successes have already been accrued and the results used commercially. In FY 1991, utility company sponsored full cost'' recovery programs based upon materials technology developed in this project were initiated on topics such as condensing heat exchangers, high temperature composites for utility vaults used in district heating systems, and corrosion resistant coatings for use in oil-fired electric generating processes. In FY 1991 the DOE/GD-sponsored R D project was focused on reducing well drilling, fluid transport and energy conversion costs. Specific activities being performed included lightweight CO{sub 2}- resistant well cements, chemical systems for lost circulation control, thermally conductive and scale resistant protective linear systems, corrosion mitigation in process components at The Geysers, and elastomer-metal bonding systems needed for use in high temperature well drilling and safety related applications.

Kukacka, L.E.

1991-12-01T23:59:59.000Z

347

Geothermal Materials Development. Annual report FY 1991  

SciTech Connect (OSTI)

Advances in the development of new materials, the commercial availabilities of which are essential for the attainment of Hydrothermal Category Level I and II Objectives, continue to be made in the Geothermal Materials Development Project. Many successes have already been accrued and the results used commercially. In FY 1991, utility company sponsored ``full cost`` recovery programs based upon materials technology developed in this project were initiated on topics such as condensing heat exchangers, high temperature composites for utility vaults used in district heating systems, and corrosion resistant coatings for use in oil-fired electric generating processes. In FY 1991 the DOE/GD-sponsored R&D project was focused on reducing well drilling, fluid transport and energy conversion costs. Specific activities being performed included lightweight CO{sub 2}- resistant well cements, chemical systems for lost circulation control, thermally conductive and scale resistant protective linear systems, corrosion mitigation in process components at The Geysers, and elastomer-metal bonding systems needed for use in high temperature well drilling and safety related applications.

Kukacka, L.E.

1991-12-01T23:59:59.000Z

348

FY 2006 Volume 5  

Broader source: Energy.gov (indexed) [DOE]

5 5 February 2005 DOE/ME-0050 Volume 5 Environmental Management Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion Non-Defense Environmental Services Uranium Enrichment Decontamination and Decommissioning Fund Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 5 February 2005 DOE/ME-0050 Volume 5 Environmental Management Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion Non-Defense Environmental Services Uranium Enrichment Decontamination and Decommissioning Fund Printed with soy ink on recycled paper Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion

349

FY 2009 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 DOE/CF-025 Volume 2 Other Defense Activities Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 2 DOE/CF-025 Volume 2 Other Defense Activities Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut Printed with soy ink on recycled paper Other Defense Activities Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut Other Defense Activities Departmental Administration

350

FY 2007 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 DOE/CF-003 Volume 2 Other defense activities Security & Safety Performance assurance Environment, safety & health Legacy management Nuclear energy Defense related administrative support Hearings and appeals Safeguards & security crosscut Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 2 DOE/CF-003 Volume 2 Printed with soy ink on recycled paper Other defense activities Security & Safety Performance assurance Environment, safety & health Legacy management Nuclear energy Defense related administrative support Hearings and appeals Safeguards & security crosscut Other Defense Activities Safeguards and Security Crosscut Other Defense Activities Safeguards and Security Crosscut Department of Energy/

351

FY 2006 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 February 2005 DOE/ME-0047 Volume 2 Other Defense Activities Security & Performance Assurance Environment, Safety & Health Legacy Management Nuclear Energy Defense Related Administrative Support Office of Hearings & Appeals Safeguards & Security Crosscut Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 2 February 2005 DOE/ME-0047 Volume 2 Other Defense Activities Security & Performance Assurance Environment, Safety & Health Legacy Management Nuclear Energy Defense Related Administrative Support Office of Hearings & Appeals Safeguards & Security Crosscut Printed with soy ink on recycled paper Other Defense Activities Safeguards and Security Crosscut Other Defense Activities Safeguards and Security Crosscut

352

FY 2006 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

6 6 February 2005 DOE/ME-0051 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 6 February 2005 DOE/ME-0051 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Power Administration

353

FY 2009 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

6 6 DOE/CF-029 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 6 DOE/CF-029 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration

354

FY 2006 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

Science Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Working Capital Fund Office of Management, Budget and Evaluation/CFO Volume 4 February 2005 DOE/ME-0049 Volume 4 Department of Energy FY 2006 Congressional Budget Request Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Working Capital Fund Office of Management, Budget and Evaluation/CFO Volume 4 February 2005 DOE/ME-0049 Volume 4 Printed with soy ink on recycled paper Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Working Capital Fund Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Working Capital Fund

355

FY 2008 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

6 6 DOE/CF-019 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 6 DOE/CF-019 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Department of Energy/

356

FY 2010 Volume 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 DOE/CF-036 Volume 2 Other Defense Activities Departmental Administration Inspector General Advanced Technology Vehicles Manufacturing Loan Program Title 17 Innovative Technology Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 2 DOE/CF-036 Volume 2 Other Defense Activities Departmental Administration Inspector General Advanced Technology Vehicles Manufacturing Loan Program Title 17 Innovative Technology Loan Guarantee Program Working Capital Fund Energy Information Administration Safeguards and Security Crosscut Printed with soy ink on recycled paper Other Defense Activities Departmental Administration Inspector General Advanced Technology Vehicles Manufacturing Loan Program

357

FY 2010 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

6 6 DOE/CF-040 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 6 DOE/CF-040 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Printed with soy ink on recycled paper Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Department of Energy/

358

FY 2008 Volume 4  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/CF-017 Volume 4 Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 4 DOE/CF-017 Volume 4 Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund Printed with soy ink on recycled paper Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund Science Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Inspector General Loan Guarantee Program Working Capital Fund

359

FY 2009 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

3 3 DOE/CF-026 Volume 3 Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 3 DOE/CF-026 Volume 3 Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Printed with soy ink on recycled paper Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management Energy Supply and Conservation Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Legacy Management

360

FY 2007 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

3 3 DOE/CF-004 Volume 3 Energy supply and Conservation Energy efficiency and renewable energy Electricity delivery and energy reliability Nuclear energy Environment, safety and health Legacy management Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 3 DOE/CF-004 Volume 3 Printed with soy ink on recycled paper Energy supply and Conservation Energy efficiency and renewable energy Electricity delivery and energy reliability Nuclear energy Environment, safety and health Legacy management Energy Supply Energy Efficiency and Renewable Energy Electricity Delivery & Energy Reliability Nuclear Energy Environment, Safety and Health Legacy Management Energy Supply Energy Efficiency and Renewable Energy Electricity Delivery & Energy Reliability

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

FY 2007 Volume 6  

Broader source: Energy.gov (indexed) [DOE]

6 6 DOE/CF-007 Volume 6 Power marketing administrations Southeastern power administration Southwestern power administration Western power administration Bonneville power administration Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 6 DOE/CF-007 Volume 6 Printed with soy ink on recycled paper Power marketing administrations Southeastern power administration Southwestern power administration Western power administration Bonneville power administration Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Power Administration Bonneville Power Administration Department of Energy/

362

FY 2006 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

7 7 February 2005 DOE/ME-0052 Volume 7 Interior & Related Agencies Fossil Energy Research & Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Energy Conservation Economic Regulation Strategic Petroleum Reserve Energy Information Administration Clean Coal Technology Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 7 February 2005 DOE/ME-0052 Volume 7 Interior & Related Agencies Fossil Energy Research & Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Energy Conservation Economic Regulation Strategic Petroleum Reserve Energy Information Administration Clean Coal Technology Printed with soy ink on recycled paper Fossil Energy Research and Development

363

ALCATOR C-MOD FY03-FY04 WORK PROPOSAL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Draft) (Draft) ALCATOR C-MOD FY03-FY04 WORK PROPOSAL March 2002 Submitted to: Office of Fusion Energy Sciences Office of Energy Research U.S. Department of Energy Germantown, MD 20874 Plasma Science and Fusion Center Massachusetts Institute of Technology Cambridge, MA 02139 ALCATOR C-MOD FY03-04 WORK PROPOSAL Table of Contents 1. Introduction.......................................................................................... 1 2. Alcator C-Mod Research Areas ............................................................11 2.1 Advanced Tokamak Thrust ............................................................11 2.2 Burning Plasma Experiment Support..............................................25 2.3 Transport

364

Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan  

Broader source: Energy.gov [DOE]

This report presents the goals, objectives, and strategies for measuring the OIG’s FY 2010 actual performance and FY 2011 planned activities.

365

Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan  

Broader source: Energy.gov [DOE]

Subject: Office of Inspector General’s combined Fiscal Year (FY) 2002 Annual Performance Results and FY 2003 Annual Performance Plan

366

Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan  

Broader source: Energy.gov [DOE]

This report presents the goals, objectives, and strategies for measuring the OIG’s FY 2011 actual performance and FY 2012 planned activities.

367

Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan  

Broader source: Energy.gov [DOE]

This report presents the goals, objectives, and strategies for measuring the OIG’s FY 2006 actual performance and FY 2007 planned activities.

368

Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan  

Broader source: Energy.gov [DOE]

This report presents the goals, objectives, and strategies for measuring the OIG’s FY 2007 actual performance and FY 2008 planned activities.

369

Attachment FY2011-74 OPAM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4 OPAM Attachment FY2011-74 OPAM Acquisition Letter AL 2011-05 FAL 2011-01 Attachment FY2011-74 OPAM More Documents & Publications Attachment FY2011-74 OPAM Attachment FY2011-74...

370

Accelerator/Experiment Operations - FY01 through FY03  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

88-DO 88-DO October 2004 Accelerator/Experiment Operations - FY 2004 C. Bromberg, J. Conrad, D. Denisov, S. Holmes, W. Louis, A. Meyer, C. Moore, R. Raja, E. Ramberg, R. Roser Edited by J. Appel This Technical Memorandum (TM) summarizes the accelerator and experiment operations for FY 2004. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2004 Run II at the Tevatron Collider, the MiniBooNE neutrino experiment, and SY 120 activities. Each section was prepared by the relevant authors, and was somewhat edited for uniformity for inclusion in this summary. Collider (Steve Holmes) FY 2004 began with the accelerator complex in the middle of an annual, scheduled

371

Project Full Funding Policy in the Annual Budget Request | Department...  

Office of Environmental Management (EM)

budgeting-fullfundingpolicy---2009-01-16.pdf More Documents & Publications FY 2010 Overall Contract and Project Management Improvement Performance Metrics and Targets Slide 1...

372

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

373

FY07 Final Report for Calibration Systems  

SciTech Connect (OSTI)

Remote infrared (IR) sensing provides a valuable method for detection and identification of materials associated with nuclear proliferation. Current challenges for remote sensors include minimizing the size, mass, and power requirements for cheaper, smaller, and more deployable instruments without affecting the measurement performance. One area that is often overlooked is sensor calibration design that is optimized to minimize the cost, size, weight, and power of the payload. Yet, an on-board calibration system is essential to account for changes in the detector response once the instrument has been removed from the laboratory. The Calibration Systems project at Pacific Northwest National Laboratory (PNNL) is aimed towards developing and demonstrating compact quantum cascade (QC) laser-based calibration systems for infrared sensor systems in order to provide both a spectral and radiometric calibration while minimizing the impact on the instrument payload. In FY05, PNNL demonstrated a multi-level radiance scheme that provides six radiance levels for an enhanced linearity check compared to the currently accepted two-point scheme. PNNL began testing the repeatability of this scheme using a cryogenically cooled, single-mode quantum cascade laser (QCL). A cyclic variation in the power was observed that was attributed to the thermal cycling of the laser's dewar. In FY06, PNNL continued testing this scheme and installed an auxiliary liquid nitrogen reservoir to limit the thermal cycling effects. Although better repeatability was achieved over a longer time period, power fluctuations were still observed due to the thermal cycling. Due to the limitations with the cryogenic system, PNNL began testing Fabry-Perot QCLs that operate continuous-wave (cw) or quasi-cw at room temperature (RT) in FY06. PNNL demonstrated a multi-level scheme that provides five radiance levels in 105 seconds with excellent repeatability. We have continued testing this repeatability in FY07. A burn-in effect appears in which the power increases over a certain time period. Repeatability better than 1%, however, is demonstrated for most of the radiance levels after this initial burn-in. In FY06, PNNL also began investigating a fiber-coupled RT QCL for a compact IR calibration source. PNNL demonstrated a uniform beam profile by measuring a time-averaged response and modulating the fiber optic with a motor to minimize the effects of speckle. In FY07, PNNL examined the power stability of fiber-coupled QCLs. Feedback appears to degrade the stability so that anti-reflective coatings for fibers may be essential. In FY07, PNNL continued to investigate the stability of room temperature QCLs as well as the measurement technique to provide a quantitative estimate for the measurement uncertainty. We designed and built a custom environmental enclosure to reduce the measurement uncertainty. After an initial burn-in, we have achieved uncertainties better than 0.1% for data collected over almost 100 hours of operation. We also built a bench-top system to demonstrate how the QC laser can be used to calibrate a microbolometer array and illustrated the importance of a multi-point calibration.

Myers, Tanya L.; Broocks, Bryan T.; Cannon, Bret D.; Ho, Nicolas

2007-12-01T23:59:59.000Z

374

FY 2010 FOIA Requests  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-FOIA-Requests Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance &...

375

EERE FY 2015 Budget Request  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies eere.energy.gov 7 FY 2015 EERE Budget Request - 2.317B Vehicles, 359M Bioenergy, 253M Fuel Cells, 93M Advanced Manufacturing, 305M Buildings, 212M...

376

The Economic University, FY2011  

E-Print Network [OSTI]

The Economic Impact of Binghamton University, FY2011 (July 1, 2010-June 30, 2011) Office....................................................................................................................2 ECONOMIC OUTPUT and Tioga counties) and the New York State economy in terms of economic output, jobs, and human capital

Suzuki, Masatsugu

377

NNSA FY14 BUDGET REQUEST  

National Nuclear Security Administration (NNSA)

FY14 BUDGET REQUEST FY14 BUDGET REQUEST We're keeping the American people safe. President Obama has laid out the most ambitious view of nuclear security in decades. Our nonproliferation, counterterrorism, and modern-day nuclear deterrent programs keep the American people safe every day. The President remains committed to a safe, secure, and reliable nuclear deterrent, and his FY14 budget provides $7.9 billion for NNSA's weapons activities. o Our Life Extension Programs (LEPs) are moving forward to ensure the aging American nuclear weapons deterrent remains safe, secure, and effective. $1 billion is requested in FY14 to directly support these programs. The W76-1 LEP, now in Phase 6.6 full

378

FY05 Targeted Technology Transfer to US Independents  

SciTech Connect (OSTI)

Petroleum Technology Transfer Council (PTTC) was established by domestic crude oil and natural gas producers in 1994 as a national not-for-profit organization to address the increasingly urgent need to improve the technology-transfer process in the U.S. upstream petroleum industry. PTTC's technology-transfer programs enhance U.S. national security. PTTC administers the only nation-wide, comprehensive program dedicated to maximizing America's supplies of domestic oil and gas. PTTC conducts grassroots programs through 10 Regional Lead Organizations (RLOs) and two satellite offices, leveraging their preexisting connections with industry. This organizational structure helps bring researchers and academia to the table. Nationally and regionally, volunteers within a National Board and Regional Producer Advisory Groups guide efforts. The National Board meets three times per year, an important function being approving the annual plans and budgets developed by the regions and Headquarters (HQ). Between Board meetings, an active Management and Budget Committee guide HQ activity. PTTC itself undergoes a thorough financial audit each year. The PTTC's HQ staff plans and manages all aspects of the PTTC program, conducts nation-wide technology-transfer activities, and implements a comprehensive communications program. Networking, involvement in technical activities, and an active exhibit schedule are increasing PTTC's sphere of influence with both producers and the oilfield service sector. Circulation for ''PTTC Network News'', the quarterly newsletter, has risen to nearly 17,500. About 7,500 people receive an email Technology Alert on an approximate three-week frequency. Case studies in the ''Petroleum Technology Digest in World Oil'' appear monthly, as do ''Tech Connections'' columns in ''The American Oil and Gas Reporter''. As part of its oversight responsibility for the regions, the PTTC from the start has captured and reported data that document the myriad ways its programs impact industry. Of 119 workshops in FY05 where repeat attendance was reported, 59 percent of attendees on average had attended a PTTC event previously, indicating that a majority felt they were receiving enough value to come back. It also is encouraging that, after 11 years, PTTC events continue to attract new people. The form used at workshops to get participants feedback asks for a ''yes'' or ''no'' response to the question: ''Have you used any new technologies based on knowledge gained through PTTC?'' With data now available from 611 workshops, 41 percent of respondents said, ''yes'', confirming that people are applying the information they receive at PTTC workshops. PTTC in FY04 asked RLO directors, oilfield service companies and producers in 11 areas with significant technological barriers to adding new reserves to estimate the ''PTTC Impact Factor''--that is, the percentage of the total reserves added in their areas that logically could be attributed to PTTC's efforts. Of the estimated 1,266 million barrels of oil equivalent (BOE) added in the 11 areas, participants estimated that roughly 88 million BOE had been added as a result of PTTC's techtransfer efforts. PTTC's 10 regions are the primary delivery mechanism for technology transfer. Attendance at PTTC regional activities set a record in FY05, with 8,900 individuals attending 154 workshops, lunch-and-learn events, or student training and internships. When appropriate, regional workshops incorporate R&D findings from DOE-funded projects. This year HQ began a ''Microhole Technology Integration'' Initiative with DOE to more clearly present their microhole program to producers. Often events are held cooperatively with other national organizations, regional producer associations and professional society groups. This practice leverages outreach and engenders future cooperation. Of the more than 61,000 individuals PTTC has attracted to its events since its inception, more than 15,000 have attended in the past two years. Eight-eight percent of PTTC event attendees during FY05 were from industry. The numb

Donald F. Duttlinger; E. Lance Cole

2005-11-01T23:59:59.000Z

379

FY 2005 Quantum Cascade Laser Alignment System Final Report  

SciTech Connect (OSTI)

The Alignment Lasers Task of Pacific Northwest National Laboratory's (PNNL's) Remote Spectroscopy Project (Project PL211I) is a co-funded project between DOE NA-22 and a Classified Client. This project, which began in the second half of FY03, involved building and delivering a Quantum Cascade (QC) Laser Alignment System to be used for testing the pupil alignment of an infrared sensor by measuring the response from four pairs of diametrically opposed QC lasers. PNNL delivered the system in FY04 and provided technical assistance in FY05 culminating into a successful demonstration of the system. This project evolved from the Laser Development Task of PL211I, which is involved in developing novel laser technology to support development of advanced chemical sensors for detecting the proliferation of nuclear weapons. The laser systems are based on quantum cascade (QC) lasers, a new semiconductor source in the infrared. QC lasers can be tailored to emit light throughout the infrared region (3.5 ? 17 ?m) and have high output power and stability. Thus, these lasers provide an infrared source with superb power and spectral stability enabling them to be used for applications such as alignment and calibration in addition to chemical sensing.

Myers, Tanya L.; Cannon, Bret D.; Wojcik, Michael D.; Broocks, Bryan T.; Stewart, Timothy L.; Hatchell, Brian K.

2006-01-11T23:59:59.000Z

380

FY 2007 Operating Plan for DOE--March 16, 2007.xls  

Broader source: Energy.gov (indexed) [DOE]

Operating Plan by Appropriation Operating Plan by Appropriation (Dollars in Thousands) FY 2006 FY 2007 FY 2008 Current Operating Congressional Approp. Plan Request Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and conservation Operation and maintenance........................................... 1,781,242 2,065,474 2,187,943 Construction.................................................................... 31,155 89,030 ---- Total, Energy supply and conservation.............................. 1,812,397 2,154,504 2,187,943 Fossil energy programs Clean coal technology..................................................... -20,000 ---- -58,000 Fossil energy research and development....................... 580,669 592,621 566,801

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

FY 2006 Volume 3  

Broader source: Energy.gov (indexed) [DOE]

Energy Supply Energy Supply Energy Efficiency and Renewable Energy Electric Transmission and Distribution Nuclear Energy Environment, Safety & Health Legacy Management Office of Management, Budget and Evaluation/CFO Volume 3 February 2005 DOE/ME-0048 Volume 3 Department of Energy FY 2006 Congressional Budget Request Energy Supply Energy Efficiency and Renewable Energy Electric Transmission and Distribution Nuclear Energy Environment, Safety & Health Legacy Management Office of Management, Budget and Evaluation/CFO Volume 3 February 2005 DOE/ME-0048 Volume 3 Printed with soy ink on recycled paper Energy Supply Energy Efficiency and Renewable Energy Electric Transmission and Distribution Nuclear Energy Environment, Safety and Health Legacy Management Energy Supply Energy Efficiency and Renewable Energy

382

FY 2007 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

7 7 DOE/CF-008 Volume 7 Fossil energy and other Fossil energy research and development Naval petroleum & oil shale reserves Elk hills school lands fund Strategic petroleum reserve Clean coal technology Energy information administration Department of Energy FY 2007 Congressional Budget Request February 2006 Office of Chief Financial Officer Volume 7 DOE/CF-008 Volume 7 Printed with soy ink on recycled paper Fossil energy and other Fossil energy research and development Naval petroleum & oil shale reserves Elk hills school lands fund Strategic petroleum reserve Clean coal technology Energy information administration Fossil Energy Research and Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Strategic Petroleum Reserve Clean Coal Technology

383

FY 2008 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

7 7 DOE/CF-020 Volume 7 Fossil Energy and Other Fossil Energy Research and Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Strategic Petroleum Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas Energy Information Administration Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Volume 7 DOE/CF-020 Volume 7 Fossil Energy and Other Fossil Energy Research and Development Naval Petroleum & Oil Shale Reserves Elk Hills School Lands Fund Strategic Petroleum Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas Energy Information Administration Printed with soy ink on recycled paper Fossil Energy Research and Development Naval Petroleum & Oil Shale Reserves

384

FY 2010 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

7 7 DOE/CF-041 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 7 DOE/CF-041 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas Printed with soy ink on recycled paper Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas

385

Operating plan FY 1998  

SciTech Connect (OSTI)

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

386

Engineering (FY2011 and  

E-Print Network [OSTI]

MD 2,3 (FY2011 and beyond) MBA2 (first year) LAW 2 10% 4 * 1,914 2,040 2,198 2,682 2,268 15% 6 3 2,871,792 10,728 9,072 50% 20 8, 9, or 10 9,570 10,200 10,990 13,410 11,340 TGR 4-20 0-3 2,871 2,871 - 2,871 2,871,785 5,100 5,495 6,705 5,670 80% 32 4 3,828 4,080 4,396 5,364 4,536 85% 34 3 2,871 3,060 3,297 4,023 3

Kay, Mark A.

387

Fourth Quarter FY 2009  

Broader source: Energy.gov (indexed) [DOE]

December 2009 1 December 2009 1 Fourth Quarter FY 2009 December 1, 2009; Issue No. 61 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 8) DOE Begins Online Posting of Categorical Exclusion Determinations The Department of Energy (DOE) is now posting most of its categorical exclusion (CX) determinations on the web under a policy that went into effect November 2, 2009. In establishing the policy, Deputy Secretary Daniel B. Poneman referred to President Obama's commitment to "creating an unprecedented level of openness in Government," including by posting information online. "Such openness is especially important when the information relates to the Department's

388

FY 2009 Volume 7  

Broader source: Energy.gov (indexed) [DOE]

7 7 DOE/CF-030 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 7 DOE/CF-030 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas Printed with soy ink on recycled paper Fossil Energy Research and Development Naval Petroleum & Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas

389

NREL: News - NREL's Economic Benefit to Colorado totals $814...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1413 NREL's Economic Benefit to Colorado totals 814.8 Million in FY 2012 Energy laboratory is one of Jefferson County's largest employers February 22, 2013 The net economic...

390

FY 2010 Performance Goals Artificial Retina Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10 Performance Goals 10 Performance Goals 2010 Annual Goal: Advance blind patient sight: Initiate preclinical studies of 200+ electrode implantable device. Complete specification for 1000+ pixel device. Performance Goal/Annual Target Quarter Quarter Goal Quarterly Results: Yes or No? 1st Quarter Design verification of subsystems for preclinical 200+ system. Goal Met. The design verification of the subsystems for the preclinical 200+ system has been completed. The thin film electrode array and the demultiplexer which were updated based on the A - 60 clinical trials have been fabricated and successfully tested. 2nd Quarter Assembly of preclinical 200+ systems. Goal Met. The assembly of the components including the thin film electrode array and the electronics package for a Preclinical 200+ system has been completed. Initial functional testing has verified that wireless power and telemetry was transmitted and received from the Preclinical 200+ system.

391

List of International Projects for FY 2012  

Office of Environmental Management (EM)

UK Development of Cryograb technology for application to sludge removal challenges in tanks with significant obstructions UK NNL SRNL NuVision Waste Processing UK Glass Chemistry...

392

MATERIALS PERFORMANCE TARGETED THRUST FY 2004 PROJECTS  

SciTech Connect (OSTI)

The Yucca Mountain site was recommended by the President to be a geological repository for commercial spent nuclear fuel and high-level radioactive waste. The multi-barrier approach was adopted for assessing and predicting system behavior, including both natural barriers and engineered barriers. A major component of the long-term strategy for safe disposal of nuclear waste is first to completely isolate the radionuclides in waste packages for long times and then to greatly retard the egress and transport of radionuclides from penetrated packages. The goal of the Materials Performance Targeted Thrust program is to further enhance the understanding of the role of engineered barriers in waste isolation. In addition, the Thrust will explore technical enhancements and seek to offer improvements in materials costs and reliability.

DOE

2005-09-13T23:59:59.000Z

393

Microsoft Word - No Fear Stats FY04.doc  

Broader source: Energy.gov (indexed) [DOE]

No Fear Act Report FY 2004 EEO Year End Data October 1, 2003 through September 30, 2004 I. Complaint Activity: 29 CFR §1614.704(a) - (c) Number/Totals Complaints Filed in FY: 1614.704(a) 81 Individual Filers (Complainants): 1614.704(b) 74 Repeat Filers: 1614.704(c) 3 II. Complaints by Basis: 29 CFR §1614.704(d) Basis Number/Totals Age 31 Color 5 Disability 5 National Origin 16 Race 37 Religion 2 Reprisal 30 Sex (Includes Complaints Filed Under Equal Pay Act) 25 Other 0 III. Complaints by Issue: 29 CFR §1614.704(e) Issue Number/Totals Appointment/Hire 15 Assignment of Duties 13 Awards 2 Conversion to Full-Time 0 Disciplinary Actions -- -- Demotion 1 Reprimand 0 Suspension 0 Removal 0 Other 0 Duty Hours 0 Evaluation/Appraisal 3 Examination/Test 0

394

FY 2016 Congressional Budget Request for OE  

Broader source: Energy.gov [DOE]

FY 2016 Budget in Brief and detailed Congressional Budget Request for OE. The FY 2016 request reflects the Administration’s priority on modernizing the electric grid and boosting the resilience of infrastructure.

395

FY 2013 Summary Table by Organization  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FY 2013 vs. FY 2012 Current Enacted 1 Request % National Security Weapons Activities 6,865,775 7,214,120 7,577,341 +363,221 +5.0% Defense Nuclear Nonproliferation 2,281,371...

396

FY 2016 Budget Request Now Available  

Broader source: Energy.gov [DOE]

The Office of Electricity Delivery and Energy Reliability’s FY 2016 Budget Request is now available. The FY 2016 request reflects the Administration’s priority on modernizing the electric grid and boosting the resilience of infrastructure.

397

Atmospheric Science Program. Summaries of research in FY 1994  

SciTech Connect (OSTI)

This report provides descriptions for all projects funded by ESD under annual contracts in FY 1994. Each description contains the project`s title; three-year funding history (in thousands of dollars); the contract period over which the funding applies; the name(s) of the principal investigator(s); the institution(s) conducting the projects; and the project`s objectives, products, approach, and results to date (for most projects older than one year). Project descriptions are categorized within the report according to program areas: atmospheric chemistry, atmospheric dynamics, and support operations. Within these categories, the descriptions are ordered alphabetically by principal investigator. Each program area is preceded by a brief text that defines the program area, states it goals and objectives, lists principal research questions, and identifies program managers. Appendixes provide the addresses and telephone numbers of the principal investigators and define the acronyms used.

NONE

1995-06-01T23:59:59.000Z

398

Department of Energy FY 2012 OMB Scorecard  

Office of Energy Efficiency and Renewable Energy (EERE)

Office of Management and Budget (OMB) Scorecard reporting Department of Energy sustainability achievements for fiscal year (FY) 2012.

399

Department of Energy FY 2011 OMB Scorecard  

Office of Energy Efficiency and Renewable Energy (EERE)

Office of Management and Budget (OMB) Scorecard reporting Department of Energy sustainability achievements for fiscal year (FY) 2011.

400

Department of Energy FY 2010 OMB Scorecard  

Office of Energy Efficiency and Renewable Energy (EERE)

Office of Management and Budget (OMB) Scorecard reporting Department of Energy sustainability achievements for fiscal year (FY) 2010.

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Solid waste integrated forecast technical (SWIFT) report: FY1997 to FY 2070, Revision 1  

SciTech Connect (OSTI)

This web site provides an up-to-date report on the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: an overview of Hanford-wide solid waste to be managed by the WM Project; program-level and waste class-specific estimates; background information on waste sources; and comparisons with previous forecasts and with other national data sources. This web site does not include: liquid waste (current or future generation); waste to be managed by the Environmental Restoration (EM-40) contractor (i.e., waste that will be disposed of at the Environmental Restoration Disposal Facility (ERDF)); or waste that has been received by the WM Project to date (i.e., inventory waste). The focus of this web site is on low-level mixed waste (LLMW), and transuranic waste (both non-mixed and mixed) (TRU(M)). Some details on low-level waste and hazardous waste are also provided. Currently, this web site is reporting data th at was requested on 10/14/96 and submitted on 10/25/96. The data represent a life cycle forecast covering all reported activities from FY97 through the end of each program's life cycle. Therefore, these data represent revisions from the previous FY97.0 Data Version, due primarily to revised estimates from PNNL. There is some useful information about the structure of this report in the SWIFT Report Web Site Overview.

Valero, O.J.; Templeton, K.J.; Morgan, J.

1997-01-07T23:59:59.000Z

402

Biological Systems for Hydrogen Photoproduction - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Maria L. Ghirardi (Primary Contact), Paul W. King, Kathleen Ratcliff and David Mulder National Renewable Energy Laboratory (NREL) 1617 Cole Blvd. Golden, CO 80401 Phone: (303) 384-6312 Email: maria.ghirardi@nrel.gov DOE Manager Eric Miller Phone: (202) 287-5829 Email: Eric.Miller@hq.doe.gov Subcontractors: * Dr. Sergey Kosourov, Institute of Basic Biological Problems, RAS, Pushchino, Russia * Dr. Eric Johnson, Johns Hopkins University, Baltimore, MD Project Start Date: October 1, 2000 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Primary Objectives

403

Joint NEA-IAEA International Peer Review of the Yucca Mountain Site Characterization Project's Total System Performance Assessment Supporting the Site  

Broader source: Energy.gov (indexed) [DOE]

NEA-IAEA International Peer Review of the NEA-IAEA International Peer Review of the Yucca Mountain Site Characterization Project's Total System Performance Assessment Supporting the Site Recommendation Process Final Report December 2001 This document is not an official copy and is for informational purposes only. CONTENTS Summary Objectives International perspective Recommendations for future assessments 1 Introduction 1.1 Background to the Yucca Mountain Project 1.2 Terms of reference, objectives and scope of the review 1.3 Conduct of the review 1.4 Organisation of this report 2 General Considerations 2.1 Regulatory perspective 2.2 Performance assessment rationale 2.3 General approach to performance assessment 2.4 Documentation 3 Sub-system methodology 3.1 Repository design

404

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

405

Herbaceous Energy Corps Program: Annual progress report for FY 1986  

SciTech Connect (OSTI)

This report describes the activities and accomplishments of the Herbaceous Energy Crops Program (HECP) for the year ending September 30, 1986. HECP is devoted to research on the development of terrestrial, nonwoody plant species for use as energy feedstocks. HECP emphasizes lignocellulosic forage crops. In FY 1986 screening and selection trials continued on 25 species of perennial and annual grasses and legumes in five projects in the Southeast and the Midwest-Lake States regions. Research also continued on the development of winter rapeseed as a diesel-fuel substitute. Activities in FY 1986 included genetic crosses and selections to incorporate atrazine resistance, development of Canola-quality winter rapeseed for the Southeast, and development of dwarf varieties. Production practices for double-cropped winter rapeseed in the Southeast were also examined. Exploratory research efforts in FY 1986 included the physiology and biochemistry of hydrocarbon production in latex-bearing plants, the productivity of cattail stands under sustained harvesting, the development of tissue culture techniques for hard-to-culture sorghum genotypes, and the start of a study to measure sustained productivity of old-field successional vegetation. Environmental and economic analyses in FY 1986 included studies on the uses of wetlands and wet soils, the use of lignocellulosic crops as an alcohol feedstock, the potential of direct combustion of lignocellulosic crops, and existing oilseed extraction facilities. 6 refs., 12 figs., 15 tabs.

Cushman, J.H.; Turhollow, A.F.; Johnston, J.W.

1987-05-01T23:59:59.000Z

406

Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)  

SciTech Connect (OSTI)

The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

Higginson, M.C.

1994-10-01T23:59:59.000Z

407

Parker-Davis Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Davis Project Davis Project FY 2012 Status & Preliminary FY 2013 Annual Operating Plans May 3, 2012 Agenda * Introduction * Hydrology Update * FY 2011 AOP Estimates Presented 5/5/11 & Final Results Final Results * Status of FY 2012 Annual Operating Plan * Preliminary FY 2013 Annual Operating Plan * FY 2013 Purchase Power * Next Steps 1 Hydrology Update For WY 2012 & Actual WY 2011 Results WY 2012 WY 2011 Lake Powell (maf) % (maf) % Unreg Inflow (Norm=12.1) 6.8 56% 16.0 132% Apr-Jul Unreg Inflow (Norm=7.9) 3.5 49% 12.5 158% (Norm=7.9) 3.5 49% 12.5 158% Storage (Max=24.3) 15.1 62% 17.6 74% Releases to Lake Mead (Norm=8.23) 9.5 115% 12.5 152% (ft.) (ft.) Max Lake Elev. 3650 (Oct) 3661 (Jul) Min Lake Elev. 3633 (Sep) 3611 (Mar) Year-End Lake Elev. 3633 3653 2 Colorado River Basin above Lake Powell Water Year Water Year Snowpack and Precipitation

408

Barriers to solar process heat projects: Fifteen highly promising (but cancelled) projects  

SciTech Connect (OSTI)

We analyzed technical, economic, and institutional barriers encountered by the solar industry in penetrating the market of solar thermal systems as applied in industry, commerce, and government. The barriers discussed are not theoretical or developed by conducting marketing research surveys of potential users. Rather, they are barriers that precluded implementing actual solar projects for 15 ``highly promising`` prospective users. The efforts to determine their technical and economic feasibility were funded by the US Department of Energy (DOE) Solar Process Heat (SPH) program. Each year, the SPH program conducts a prefeasibility studies activity -- an engineering assessment of the technical and economic feasibility of a solar system for a specific application for a specific end-user. These studies also assess institutional issues that impact the feasibility of the proposed project and develop an action plan for the project`s implementation. In FY 1991 and FY 1992, the program funded a total of 11 studies in which solar projects were investigated for 21 potential users. Of these 21 potential users, only three have made firm commitments to acquire solar systems, yielding a 14% success rate (decisions by three other companies are still pending). The low success rate is disappointing because the solar companies had complete freedom to select ``highly promising`` potential users. We therefore evaluated the reasons for the low success rate and the implications for market penetration.

Carwile, C. [USDOE, Washington, DC (United States). Office of Industrial Technologies] [USDOE, Washington, DC (United States). Office of Industrial Technologies; Hewett, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States)

1994-10-01T23:59:59.000Z

409

NGNP Process Heat Applications: Hydrogen Production Accomplishments for FY2010  

SciTech Connect (OSTI)

This report summarizes FY10 accomplishments of the Next Generation Nuclear Plant (NGNP) Engineering Process Heat Applications group in support of hydrogen production technology development. This organization is responsible for systems needed to transfer high temperature heat from a high temperature gas-cooled reactor (HTGR) reactor (being developed by the INL NGNP Project) to electric power generation and to potential industrial applications including the production of hydrogen.

Charles V Park

2011-01-01T23:59:59.000Z

410

Hydrogen, Fuel Cells, and Infrastructure Technologies FY 2002 Progress Report IV.E Air Management Subsystems  

E-Print Network [OSTI]

the motor driven compressor/expander and evaluated performance, weight and cost projection data. As comparedHydrogen, Fuel Cells, and Infrastructure Technologies FY 2002 Progress Report 490 IV.E Air and by improving upon previous project results. · Reduce turbocompressor/motor controller costs while increasing

411

FY 2008 Meetings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fiscal Year 2008 Meetings Fiscal Year 2008 Meetings Meetings, Minutes and Handouts Date Type Time Location Agenda Handouts Minutes Nov 6, 2007 EMPIRE Committee 2:30 - 3:45 p.m. 821 E. Amargosa Farm Road Amargosa Valley, NV 89020 Fact Sheet Review n/a Minutes Nov 6, 2007 Budget Committee 4 - 5 p.m. 821 E. Amargosa Farm Road Amargosa Valley, NV 89020 FY 2008 Budget Update Handouts Minutes Nov 6, 2007 Full Board Meeting 6 p.m. 821 E. Amargosa Farm Road Amargosa Valley, NV 89020 Agenda Handouts Minutes Nov 27, 2007 Transportation/Waste Committee 3 p.m. Conference call Transportation Routes n/a Minutes Jan 10, 2008 EMPIRE Committee 3:15 - 4:15 Bob Ruud Community Center 150 Hwy 160, Pahrump, NV n/a n/a Minutes Jan 10, 2008 Outreach Ad Hoc Committee 4:30 - 5:30 Bob Ruud Community Center 150 Hwy 160, Pahrump, NV n/a n/a Minutes

412

Idaho National Laboratory’s FY09 & FY10 Greenhouse Gas Report  

SciTech Connect (OSTI)

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2009 and 2010 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions. INL's GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL's organizational boundaries, but are a consequence of INL's activities). This inventory found that INL generated 103,590 and 102,413 MT of CO2-equivalent emissions during FY09 and FY10, respectively. The following conclusions were made from looking at the results of the individual contributors to INL's FY09 and FY10 GHG inventories: (1) Electricity (including the associated transmission and distribution losses) is the largest contributor to INL's GHG inventory, with over 50% of the CO2e emissions; (2) Other sources with high emissions were stationary combustion (facility fuels), waste disposal (including fugitive emissions from the onsite landfill and contracted disposal), mobile combustion (fleet fuels), employee commuting, and business air travel; and (3) Sources with low emissions were wastewater treatment (onsite and contracted), fugitive emissions from refrigerants, and business ground travel (in personal and rental vehicles). This report details the methods behind quantifying INL's GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by the Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only that large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

Jennifer D. Morton

2011-06-01T23:59:59.000Z

413

FY 2006 Control Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

Organization Organization (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Discretionary Summary By Organization National Security Weapons........................................................................................ 6,447,159 6,583,350 6,630,133 +46,783 +0.7% Defense Nuclear Nonproliferation................................................... 1,367,709 1,422,103 1,637,239 +215,136 +15.1% Naval Reactors............................................................................... 761,872 801,437 786,000 -15,437 -1.9% Office of the Administrator.............................................................. 352,949 357,051 343,869 -13,182 -3.7% Other Defense Activities................................................................. -446 -- -- -- --

414

FY 2012 Control Table by Appropriation  

Broader source: Energy.gov (indexed) [DOE]

FY 2012 Summary Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2010 FY 2011 FY 2011 FY 2012 Current Congressional Annualized Congressional Approp. Request CR Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy....................................... 2,216,392 2,355,473 2,242,500 3,200,053 +983,661 +44.4% Electricity delivery and energy reliability........................................ 168,484 185,930 171,982 237,717 +69,233 +41.1% Nuclear energy............................................................................. 774,578 824,052 786,637 754,028

415

FY11 OE public summary  

Broader source: Energy.gov (indexed) [DOE]

The FY 2011 Office of Electricity Delivery and Energy Reliability (OE) budget request is $185.9 million, $14.0 million more than the FY 2010 Appropriation, which reflects increased investments in research and development, particularly in energy storage, advanced grid modeling and power electronics. The FY 2011 request supports the efforts of the Research and Development program; the Permitting, Siting, and Analysis program; and the Infrastructure Security and Energy Restoration program to modernize the electric grid, enhance security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. The proposed budget provides a balanced and diverse portfolio of activities, including: Research and Development ($144.3 million)

416

OPT Annual Report, FY 2012  

Broader source: Energy.gov (indexed) [DOE]

OPT Annual Report, FY 2012 OPT Annual Report, FY 2012 i Executive Summary The Office of Environmental Management (EM) was established to mitigate the risks and hazards posed by the legacy of nuclear weapons production and research. The most ambitious and far ranging of these missions is dealing with the environmental legacy of the Cold War. Many problems posed by its operations are unique, and include the transportation of unprecedented amounts of contaminated waste, water, and soil, and a vast number of contaminated structures during remediation of the contaminated sites. Since Fiscal Year (FY) 2004, EM has completed over 150,000 shipments of radioactive material and waste. The mission of the Department of Energy (DOE) Office of Packaging and Transportation (OPT) positioned

417

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

FY2010 FY2011 FY2012 Fee Information Minimum Fee Maximum Fee June 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,245,814,927 Contract Period: EM Contractor Fee Site:...

418

Hanford, diversification, and the Tri-Cities Economy FY 1998  

SciTech Connect (OSTI)

The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study (see Figure 1). In the federal fiscal year (IV) 1998 (October 1, 1997 through September 30, 1998), the total impact of DOEs local $1.6 billion budget was felt through payrolls of $519 million and local purchases of goods and services of $246 million. The total local spending of $765 million was down slightly from the FY 1997 total of $774 million. Taking into account the slightly greater multiplier effects of this spending due to changes in its mix, the DOE/RL budget sustained an estimated 36% of all local employment (31,200 out of 86,000 jobs) and up to 64% of local wage income ($1.55 billion out of $2.40 billion). This was up slightly from the year before (29,500 jobs, $1.49 billion income). DOE budget increases in FY 1999 are expected to result in a net increase of about 200 local DOE contractor jobs over the September 30, 1998 level, or about equal to the FY 1998 average. In addition, economic diversification more than offset the impact of the local DOE losses in FY 1998 and, together with an initial economic boost from privatization of Hanford's tank waste cleanup, is expected to play a significant expansive role in FY 1999. All of these positives, taken together with their multiplier effects, would directly or indirectly add a total 2,750 jobs and at least $135 million in income to the economy. However, agriculture and related regional services are expected to be weaker than in FY 1998, offsetting part of these gains. The overall net effect still is expected to be a net increase of 2,050 jobs and $86 million in wage income.

SCOTT, M.J.

1999-04-14T23:59:59.000Z

419

Institutional Plan FY 2003 - 2007  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disclaimer Disclaimer While this document is believed to contain correct information, the United States Government nor any agency thereof makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that it would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by its trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. INSTITUTIONAL PLAN FY 2003 - 2007 INSTITUTIONAL PLAN FY 2003 - 2007 1 Table of Contents Page 1 Introduction

420

Contract Number: Performance Period FY2011 FY2012 FY2013 FY2014  

Office of Environmental Management (EM)

Fee Information August 2011 through April 2019 EM Contractor Fee September 2014 West Valley Demonstration Project - West Valley, NY Site: 477,476,867 West Valley...

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

FY 2006 Financial Awards  

Broader source: Energy.gov [DOE]

In 2006, DOE awarded funding to a number of science and research projects to support research, development, and demonstration of hydrogen and fuel cell technologies.

422

FY 2008 Financial Awards  

Broader source: Energy.gov [DOE]

In 2008, DOE awarded funding to a number of science and research projects to support research, development, and demonstration of hydrogen and fuel cell technologies.

423

FY 2007 Financial Awards  

Broader source: Energy.gov [DOE]

In 2007, DOE awarded funding to a number of science and research projects to support research, development, and demonstration of hydrogen and fuel cell technologies.

424

Photoelectrochemical Materials: Theory and Modeling - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Muhammad N. Huda (Primary Contact), Yanfa Yan*, Todd Deutsch*, Mowafak M. Al-Jassim* and A. John A. Turner* Department of Physics University of Texas at Arlington Arlington, TX 76019 Phone: (817) 272-1097 Email: huda@uta.edu *National Renewable Energy Laboratory DOE Manager HQ: Eric L. Miller Phone: (202) 287-5892 Email: Eric.Miller@ee.doe.gov Subcontractor: University of Texas at Arlington, Arlington, TX Project Start Date: September 2009 Project End Date: August 2012 Fiscal Year (FY) 2012 Objectives For FY 2012, the main goal of this project was to improve materials efficiency by understanding and hence tuning the following by theoretical/computational modeling

425

Characterization of Fuel Cell Materials - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Karren L. More Oak Ridge National Laboratory (ORNL) 1 Bethel Valley Rd. Oak Ridge, TN 37831-6064 Phone: (865) 574-7788 Email: morekl1@ornl.gov DOE Manager HQ: Donna Ho Phone: (202) 586-8000 Email: Donna.Ho@ee.doe.gov Contributors: * David Cullen (ORNL) * Miaofang Chi (ORNL) * Kelly Perry (ORNL) Project Start Date: Fiscal Year (FY) Year 1999 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Develop and/or apply novel preparation, imaging, and * analytical methods to characterize fuel cell materials and architectures in the as-processed (fresh) state, during

426

Component Standard Research and Development - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Robert Burgess (Primary Contact), William Buttner, Matthew Post, Carl Rivkin, Chad Blake National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401 Phone: (303) 275-3823 Email: robert.burgess@nrel.gov DOE Manager HQ: Antonio Ruiz Phone: (202) 586-0729 Email: Antonio.Ruiz@ee.doe.gov Subcontractor: SAE International, Troy, MI Project Start Date: Fiscal Year (FY) 2008 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Support development of new codes and standards * required for commercialization of hydrogen technologies. Create code language that is based on the latest scientific *

427

FY 2012 Service Contract Inventory Analysis Plan  

Broader source: Energy.gov (indexed) [DOE]

Service Contract Inventory Service Contract Inventory Analysis Plan Department of Energy Office of Acquisition and Project Management Strategic Programs Division (MA-622) December 2012 Department of Energy FY 2012 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)) and Appendix D of the November 5, 2010 OMB Memorandum on Service Contract Inventories, and will ultimately identify contracts for a more in-depth review. DOE will develop the basic inventory in accordance with OMB guidance using FPDS-NG data to address a number of the inventory requirements consistent with the Consolidated Appropriations Act. APM will

428

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect (OSTI)

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

429

IceCube Project Monthly Report Accomplishments  

E-Print Network [OSTI]

against major fuel price increases beyond normal inflation. $500K Total $9,823K Available Contingency to increasing energy costs. The Antarctic Program's "pump price" paid for fuel that will be used during the FY2009 season was $2.85 per gallon (FY2009 fuel was already shipped). The price is expected

Saffman, Mark

430

Tanks Focus Area Site Needs Assessment - FY 2001  

SciTech Connect (OSTI)

The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, from collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.

Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.; Nickola, Cheryl L.

2001-04-30T23:59:59.000Z

431

FY06 DOE Energy Storage Program PEER Review  

Broader source: Energy.gov (indexed) [DOE]

7 DOE Energy Storage Program 7 DOE Energy Storage Program PEER Review FY07 DOE Energy Storage Program PEER Review John D. Boyes Sandia National Laboratories Mission Mission Develop advanced electricity storage and PE technologies, in partnership with industry, for modernizing and expanding the electric supply. This will improve the quality, reliability, flexibility and cost effectiveness of the existing system. Help create an energy storage industry Make energy storage ubiquitous ESS Program Makeup ESS Program Makeup ESS Base Program - CEC/DOE Data Acquisition and Project Support - NYSERDA/DOE Data Acquisition and Project Support - BPA ETO based STATCOM Project - ETO Development Project - Boeing Superconducting Flywheel - ACONF Coast Guard Project - Iowa Stored Energy Project - Electrolyte Research

432

Science/Fusion Energy Sciences FY 2008 Congressional Budget Fusion Energy Sciences  

E-Print Network [OSTI]

. Benefits Total world energy consumption has increased by more than 50% during the past 25 years, and given,182 31,317 Total, Fusion Energy Sciences 280,683a 318,950 427,850 Public Law Authorizations: Public LawScience/Fusion Energy Sciences FY 2008 Congressional Budget Fusion Energy Sciences Funding Profile

433

FY 2007 Annual Performance Report  

Broader source: Energy.gov [DOE]

Focuses on detailed performance information including performance targets associated with the Department’s budget activities. The report discusses individual and summary performance measure results through narrative descriptions with references to supporting documentation, a concise statement on highlevel program challenges and benefits, and the status of all FY 2006 unmet measures.

434

Attachment FY2011-73 OPAM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

73 OPAM Attachment FY2011-73 OPAM Acquisition Letter AL-2011-04 Attachment FY2011-73 OPAM More Documents & Publications Policy Flash 2011-73 G Attachment FY2011-68...

435

Attachment FY2011-68 OPAM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

68 OPAM Attachment FY2011-68 OPAM Acquisition Letter AL-2011-04 Attachment FY2011-68 OPAM More Documents & Publications Flash2011-68 OPAM Policy Flash 2011-73 Attachment FY2011-73...

436

EM Five-Year Plan (FY 2008 - FY 2012) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) The purpose of the EM Five Year Plan is to describe EM's planned strategies, funding and accomplishments over the next five years. This plan summarizes EM progress to date, presents EM performance measures, discusses assumptions and the EM decision-making process, and provides estimated EM funding over the FY 2008-2012 time period. Following this summary are sections that provide detailed information on each site including planned accomplishments at the target funding scenario. EM's five year planning targets are significantly different from the funding targets that appeared in the FY 2007-2011 Five Year Plan. Site planning allocations that formed the basis for the planned accomplishments

437

Component Testing for Industrial Trucks and Early Market Applications - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Aaron Harris (Primary Contact), Brian Somerday, Chris San Marchi Sandia National Laboratories P.O. Box 969 Livermore, CA 94551-0969 Phone: (925) 294-4530 Email: apharri@sandia.gov DOE Manager HQ: Antonio Ruiz Phone: (202) 586-0729 Email: Antonio.Ruiz@ee.doe.gov Project Start Date: January 2010 Project End Date: May 2011 (carryover from Fiscal Year [FY] 2011 extended objectives into FY 2012) Fiscal Year (FY) 2012 Objectives (1) Provide technical basis for the development of standards defining the use of steel (Type 1) storage pressure vessels for gaseous hydrogen: Compare fracture mechanics based design approach - for fatigue assessment of pressure vessels for

438

FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions, LLC, PER Summary | National Savannah River Nuclear Solutions, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2010 Savannah River Nuclear Solutions, LLC,

439

FY 2007 Washington Savannah River Company, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

7 Washington Savannah River Company, LLC, PER Summary | National 7 Washington Savannah River Company, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 Washington Savannah River Company, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 Washington Savannah River Company, LLC,

440

FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions, LLC, PER Summary | National Savannah River Nuclear Solutions, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2012 Savannah River Nuclear Solutions, LLC,

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

FY 2009 Lawrence Livermore National Security, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

Lawrence Livermore National Security, LLC, PER Summary | National Lawrence Livermore National Security, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2009 Lawrence Livermore National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2009 Lawrence Livermore National Security,

442

u.s. DEP.-\\RThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

Page 1 of2 RECIPIENT: Nebraska Energy Office STATE: NE PROJECT TITLE : FY 2012 SEP Annual Grant Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control...

443

Endangered species and cultural resources program, Naval Petroleum Reserves in California: Annual report FY95  

SciTech Connect (OSTI)

In FY95, EG and G Energy Measurements, Inc. (EG and G/EM) continued to support efforts to protect endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on Federal properties. Population monitoring activities are conducted annually for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover`s wooly-star. To mitigate impacts of oil field activities on listed species, 674 preactivity surveys covering approximately 211 hectares (521 acres) were conducted in FY95. EG and G/EM also assisted with mitigating effects from third-party projects, primarily by conducting biological and cultural resource consultations with regulatory agencies. EG and G/EM has conducted an applied habitat reclamation program at NPRC since 1985. In FY95, an evaluation of revegetation rates on reclaimed and non-reclaimed disturbed lands was completed, and the results will be used to direct future habitat reclamation efforts at NPRC. In FY95, reclamation success was monitored on 50 sites reclaimed in 1985. An investigation of factors influencing the distribution and abundance of kit foxes at NPRC was initiated in FY94. Factors being examined include habitat disturbance, topography, grazing, coyote abundance, lagomorph abundance, and shrub density. This investigation continued in FY95 and a manuscript on this topic will be completed in FY96. Also, Eg and G/EM completed collection of field data to evaluate the effects of a well blow-out on plant and animal populations. A final report will be prepared in FY96. Finally, EG and G/EM completed a life table analysis on San Joaquin kit foxes at NPRC.

NONE

1996-04-01T23:59:59.000Z

444

Buildings Energy Program annual report, FY 1991  

SciTech Connect (OSTI)

The Buildings Energy Program at PNL conducts research and development (R&D) for DOE`s Office of Building Technologies (OBT). The OBT`s mission is to lead a national program supporting private and federal sector efforts to improve the energy efficiency of the nation`s buildings and to increase the use of renewable energy sources. Under an arrangement with DOE, Battelle staff also conduct research and development projects for other federal agencies and private clients. This annual report contains an account of the buildings-related research projects conducted at PNL during fiscal year (FY) 1991. A major focus of PNL`s energy projects is to improve the energy efficiency of commercial and residential buildings. Researchers who are developing solutions to energy-use problems view a building as an energy-using system. From this perspective, a desirable solution is not only one that is cost-effective and responsive to the needs of the occupants, but also one that optimizes the interaction among the energy components and systems that compose the whole.

Secrest, T.J.

1992-05-01T23:59:59.000Z

445

Technology Development, Evaluation, and Application (TDEA) FY 1998 Progress Report Environment, Safety, and Health (ESH) Division  

SciTech Connect (OSTI)

This progress report presents the results of 10 projects funded ($504K) in FY98 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Nine projects are new for this year; two projects were completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published 19 papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space were also provided to the TDEA-funded projects by organizations external to ESH Division. Products generated from the projects funded in FY98 included a new extremity dosimeter that replaced the previously used finger-ring dosimeters, a light and easy-to-use detector to measure energy deposited by neutron interactions, and a device that will allow workers to determine the severity of a hazard.

Larry G. Hoffman; Kenneth Alvar; Thomas Buhl; Bruce Erdal; Philip Fresquez; Elizabeth Foltyn; Wayne Hansen; Bruce Reinert

1999-06-01T23:59:59.000Z

446

Fuel Cell Technologies Program FY 2013 Budget Request Rollout...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FY 2013 Budget Request Rollout Washington, DC FUEL CELL TECHNOLOGIES PROGRAM FY 2013 Budget Request Rollout to Stakeholders Sunita Satyapal U.S. Department of Energy Fuel Cell...

447

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge...  

Office of Environmental Management (EM)

Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge...

448

FY 2014 Environmental Management Budget Request to Congress ...  

Office of Environmental Management (EM)

4 Environmental Management Budget Request to Congress FY 2014 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2014...

449

FY 2014 Budget Request Summary Table | Department of Energy  

Office of Environmental Management (EM)

Summary Table FY 2014 Budget Request Summary Table Summary Table by Appropriations Summary Table by Organization More Documents & Publications FY 2014 Budget Request Statistical...

450

FY 2014 Federal Real Property Reporting Requirement | Department...  

Office of Environmental Management (EM)

Federal Real Property Reporting Requirement FY 2014 Federal Real Property Reporting Requirement FIMS FRPP FY 2014 Reporting Instructions Signed Sep 18 2014 .pdf More Documents &...

451

Electric Markets Technical Assistance Program: FY1999 Grant Descriptio...  

Broader source: Energy.gov (indexed) [DOE]

Markets Technical Assistance Program: FY1999 Grant Descriptions and Contact Information Electric Markets Technical Assistance Program: FY1999 Grant Descriptions and Contact...

452

HSI_Annual_Report_FY2010.pdf | Department of Energy  

Office of Environmental Management (EM)

HSIAnnualReportFY2010.pdf More Documents & Publications TCUReportFY2010.pdf Trade Adjustment Assistance Community College and Career Training Grant Program (TAACCCT)...

453

FY 2011 OIG Recovery Act Plan Overview | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FY 2011 OIG Recovery Act Plan Overview FY 2011 OIG Recovery Act Plan Overview The primary objective of the Office of Inspector General's oversight strategy involves the...

454

State Energy Program Formula Grant Allocations - FY 2008 | Department...  

Energy Savers [EERE]

State Energy Program Formula Grant Allocations - FY 2008 State Energy Program Formula Grant Allocations - FY 2008 U.S. Department of Energy State Energy Program (SEP) Formula Grant...

455

Office of Energy Efficiency and Renewable Energy FY 2015 Budget...  

Energy Savers [EERE]

About Us Budget Office of Energy Efficiency and Renewable Energy FY 2015 Budget Request Office of Energy Efficiency and Renewable Energy FY 2015 Budget Request U.S....

456

Attachment FY2011-25 OPAM | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

OPAM Attachment FY2011-25 OPAM Federal Leadership in Environmental, Energy, and Economic Performance Attachment FY2011-25 OPAM More Documents & Publications Chapter 23 -...

457

Highlights of the FY 2013 Congressional Budget Request for OE...  

Office of Environmental Management (EM)

for OE Highlights of the FY 2013 Congressional Budget Request for OE The Office of Electricity Delivery and Energy Reliability's FY 2013 budget request continues the commitment...

458

Office of Electricity Delivery & Energy Reliability FY 2012 Budget...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation...

459

Hydrogen and Fuel Cell Technologies FY 2014 Budget Request Rollout...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen and Fuel Cell Technologies FY 2014 Budget Request Rollout to Stakeholders Hydrogen and Fuel Cell Technologies FY 2014 Budget Request Rollout to Stakeholders Presentation...

460

FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program...

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Fuel Cells for Transportation - FY 2001 Progress Report | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cells for Transportation - FY 2001 Progress Report Fuel Cells for Transportation - FY 2001 Progress Report V. PEM STACK COMPONENT COST REDUCTION 159.pdf More Documents &...

462

Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan  

SciTech Connect (OSTI)

Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

NONE

1998-03-01T23:59:59.000Z

463

FY13 Strategic Project Update Project #4 Complete Boise State  

E-Print Network [OSTI]

for action. o The goal is to create sustainable processes and systems to ensure continual progress towards, that will include a cost effectiveness analysis. o The goal is to create sustainable processes and systems to ensure in the report are incorporated into a Strategic Enrollment Plan and the university's strategic planning process

Barrash, Warren

464

FY09 LDRD Projects 2009 Projects Page 1  

E-Print Network [OSTI]

. ESD/815E 07-080 A Novel Approach for Efficient Biofuel Generation Chidambaram, D. ESD/490A 07 and Jet Measurements at eRHIC Venugopalan, R. PHYS/510A 08-002 Strongly Correlated Systems: From Graphene

Ohta, Shigemi

465

Industrial Waste Reduction Program annual report, FY 1993  

SciTech Connect (OSTI)

The Department of Energy`s Industrial Waste Reduction Program (IWRP) sponsors the development, demonstration, and deployment of technologies that offer a significant opportunity to reduce waste generation, improve productivity, and enhance environmental performance in US industry. The program emphasizes technology-driven solutions that are economically beneficial and environmentally sound. Its goal is to improve the energy efficiency and competitiveness of private industry by cost-effectively reducing waste. Industry, universities, national laboratories and other government agencies are working cooperatively to meet this goal. The IWRP emphasizes the timely commercialization of new technologies that can produce measurable energy, environmental, and economic benefits. All projects are substantially cost-shared with private companies to foster the commercialization process. The program is proud to claim four successfully commercialized technologies that have begun generating benefits. The current IWRP portfolio boasts 32 projects in progress. Funding for the IWRP has grown from $1.7 million in 1990 to $13 million in 1994. New companies join the program each year, reaping the benefits of working cooperatively with government. New technologies are expected to reach commercial success in fiscal year (FY) 1994, further increasing the benefits already accrued. Future Annual Reports will also include projects from the Waste Utilization and Conversion Program. Descriptions of the program`s 32 active projects are organized in this report according these elements. Each project description provides a brief background and the major accomplishments during FY 1993.

Not Available

1994-01-01T23:59:59.000Z

466

FY 2009 LDRD Report to Congress  

Broader source: Energy.gov (indexed) [DOE]

LDRD Report to Congress LDRD Report to Congress Department of Energy Department of Energy FY 2009 Laboratory Directed Research and Development at the DOE National Laboratories Report to Congress April 2010 FY 2009 LDRD Report to Congress Department of Energy Table of Contents Executive Summary 1 Table 1. LDRD, PDRD and SDRD Breakdown 1 1. Introduction 2 1.1 Background 2 1.2 Purpose of the Report 2 2. FY 2009 LDRD Program 3 2.1 Financial Information 3 2.1.1 LDRD Funding Mechanism 3 2.1.2 FY 2009 Expenditures 3 Table 2. Laboratory Costs and LDRD Costs 4

467

EM Quality Assurance Assessment Schedule FY 2010  

Broader source: Energy.gov [DOE]

Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the remainder of fiscal year (FY) 2010.

468

SES Performance Cycle- Aggregate Results FY 2013  

Broader source: Energy.gov [DOE]

The memorandum releases the FY 2013 aggregate results for the Department's Senior Executive Service members and provides a summary of past results.

469

FY 2009 Progress Report for Lightweighting Materials  

Broader source: Energy.gov [DOE]

The FY 2009 Progress Report for Lightweighting Materials focuses on the development and validation of advanced materials and manufacturing technologies, to significantly reduce automotive vehicle...

470

NREL Photovoltaic Program FY 1994 bibliography  

SciTech Connect (OSTI)

This report lists all published documents of the Photovoltaic Program for FY 1994. Documents include conference papers, journal articles, book chapters, patents, etc.

none,

1994-12-01T23:59:59.000Z

471

FY 2005 LDRD Report  

Broader source: Energy.gov [DOE]

The multi-program national laboratories included in this report devoted approximately $384 million to LDRD, funding projects ranging in size from less than $5,000 per year to over $3 million, addressing topics that span the entire range of DOE's broad specific mandate.

472

FY 2006 LDRD Report  

Broader source: Energy.gov [DOE]

The multi-program national laboratories included in this report devoted approximately $476 million to LDRD, funding projects ranging in size from less than $5,000 per year to over $3 million, addressing topics that span the entire range of DOE’s broad scientific mandate.

473

FY 2004 LDRD Report  

Broader source: Energy.gov [DOE]

The multi-program National Laboratories included in this report devoted approximately $365 million to LDRD, funding projects ranging in size from less than $5,000 per year to over $3 million, addressing topics that span the entire range of DOE’s broad scientific mandate.

474

FY 2007 LDRD Report  

Broader source: Energy.gov [DOE]

The multi-program national laboratories included in this report devoted approximately $499 million to LDRD, funding projects ranging in size from less than $5,000 per year to over $3 million, addressing topics that span the entire range of DOE’s broad scientific mandate.

475

Microsoft Word - 2003-0820 RHIC collider projections.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RHIC Collider Projections (FY2004 - FY2008) RHIC Collider Projections (FY2004 - FY2008) Thomas Roser, Wolfram Fischer Last update: August 20, 2003 This note discusses in Part I possible operating modes for the RHIC Run-4 (FY2004) running period including constraints from cryogenic cool-down, machine set-up and beam commissioning. In Part II a 5-year projection is given for gold-gold and polarized proton collisions. Part I - Run-4 Projections Cryogenic operation - After the summer shutdown the two RHIC rings will be at room temperature. They will be first brought to liquid nitrogen temperature, in about 10 days. Then, two weeks will be required to cool down to 4 Kelvin. At the end of the run, one week of refrigerator operation is required for the warm-up to 80 Kelvin. Running modes - A number of running modes are considered in RHIC, such as Au-Au

476

Environmental Systems Research and Analysis FY 2000 Annual Report  

SciTech Connect (OSTI)

The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the INEEL. Strengthening the Technical capabilities of the INEEL will provide the technical base to serve effectively as the Environmental Management Laboratory for the Office of Environmental Management (EM). This is a progress report for the third year of the ESR Program (FY 2000). A report of activities is presented for the five ESR research investment areas: (1) Transport Aspects of Selective Mass Transport Agents, (2) Chemistry of Environmental Surfaces, (3) Materials Dynamics, (4) Characterization Science, and (5) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, the report describes activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas. The five research areas are subdivided into 18 research projects. FY 2000 research in these 18 projects has resulted in more than 50 technical papers that are in print, in press, in review, or in preparation. Additionally, more than 100 presentations were made at professional society meetings nationally and internationally. Work supported by this program was in part responsible for one of our researchers, Dr. Mason Harrup, receiving the Department of Energy’s “Bright Light” and “Energy at 23” awards. Significant accomplishments were achieved. Non-Destructive Assay hardware and software was deployed at the INEEL, enhancing the quality and efficiency of TRU waste characterization for shipment. The advanced tensiometer has been employed at numerous sites around the complex to determine hydrologic gradients in variably saturated vadose zones. An ion trap, secondary ion mass spectrometer (IT-SIMS) was designed and fabricated to deploy at the INEEL site to measure the chemical speciation of radionuclides and toxic metals on the surfaces of environmentally significant minerals. The FY 2001 program will have a significantly different structure and research content. This report presents the final summary of projects coming to an end in FY 2000 and is a bridge to the FY 2001 program.

David L. Miller; Castle, Peter Myer; Steven J. Piet

2001-01-01T23:59:59.000Z

477

The FY 2005 Budget Request  

Broader source: Energy.gov (indexed) [DOE]

5 Budget Request 5 Budget Request Building on a Record of Success February 2, 2004 David Garman Assistant Secretary Office of Energy Efficiency and Renewable Energy Building on a Record of Success Meeting Presidential Priorities Citizen Centered Affordable Energy Energy Security Climate Change Building on a Record of Success FY 2005 Budget Request * Supports Presidential commitment to strengthen energy security and enhance energy choices for all Americans while protecting the environment * Maintains FY 2004 request levels in budget constrained year * Builds upon and sustains a record of success * Research & Development (R&D) * Deployment * Management Building on a Record of Success Still EERE's Request Is ^ Priority Driven 1. Dramatically reduce or even end dependence on foreign oil

478

DOE Selects 13 Solar Energy Projects for up to $168 Million in Funding |  

Broader source: Energy.gov (indexed) [DOE]

13 Solar Energy Projects for up to $168 Million in 13 Solar Energy Projects for up to $168 Million in Funding DOE Selects 13 Solar Energy Projects for up to $168 Million in Funding March 8, 2007 - 10:28am Addthis First funding awards for Solar America Initiative to make solar technology cost-competitive by 2015 LOWELL, MA - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the selection of 13 industry-led solar technology development projects for negotiation for up to $168 million (FY'07-'09) in funding, subject to appropriation from Congress. These projects will help significantly reduce the cost of producing and distributing solar energy. As part of the cost-shared agreements, the industry-led teams will contribute more than 50 percent of the funding for these projects for a total value of up to $357 million over three years. These cooperative

479

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

480

Sustainable Hydrogen Fueling Station, California State University, Los Angeles - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report David Blekhman California State University Los Angeles Los Angeles, CA 90032 Phone: (323) 343-4569 Email: blekhman@calstatela.edu DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Gregory Kleen Phone: (720) 356-1672 Email: Gregory.Kleen@go.doe.gov Contract Number: DE-EE0000443 Subcontractors: * General Physics Corporation, Elkridge, MD * Weaver Construction, Anaheim, CA Project Start Date: January, 2009 Project End Date: December, 2012 *Congressionally directed project Fiscal Year (FY) 2012 Objectives Procure core equipment for the California State *

Note: This page contains sample records for the topic "fy total project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Idaho National Laboratory Cultural Resource Monitoring Report for FY 2008  

SciTech Connect (OSTI)

This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2008 (FY 2008). Throughout the year, 45 cultural resource localities were revisited including: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, one butte, twenty-eight prehistoric archaeological sites, three historic homesteads, two historic stage stations, one historic canal construction camp, three historic trails, and Experimental Breeder Reactor-I, which is a designated National Historic Landmark. Several INL project areas were also monitored in FY 2008 to assess project compliance with cultural resource recommendations, confirm the locations of previously recorded cultural resources in relation to project activities, to assess the damage caused by fire-fighting efforts, and to watch for cultural materials during ground disturbing activities. Although impacts were documented at a few locations, no significant adverse effects that would threaten the National Register eligibility of any resource were observed. Monitoring also demonstrated that INL projects generally remain in compliance with recommendations to protect cultural resources

Brenda R. Pace

2009-01-01T23:59:59.000Z

482

FY06 DOE Energy Storage Program PEER Review  

Broader source: Energy.gov (indexed) [DOE]

6 DOE Energy Storage Program 6 DOE Energy Storage Program PEER REVIEW John D. Boyes Sandia National Laboratories ESS Program Makeup ESS Base Program - CEC/DOE Data Acquisition and Project Support - NYSERDA/DOE Data Acquisition and Project Support - Boeing Superconducting Flywheel - ACONF Coast Guard Project - HybSim Hybrid Storage Model Development Congressionally-Directed Programs - University of Missouri-Rolla - Grid Modernization - Iowa Stored Energy Project - EEI - BiPolar Ni-MH Battery Development - Sprint - Storage for Telecommunications Apps. - Emerson - Network Power - Beacon Power - Frequency Regulation Plant Design - Mead Westvaco - Research on Lead-Carbon Asymmetric Super capacitors (FY05) ESS Program Makeup (cont.) ESS Program Makeup cont. SBIR - Aegis Technology - PII - Arkansas Power Electronic International -

483

Accelerator/Experiment operations - FY 2004  

SciTech Connect (OSTI)

This Technical Memorandum (TM) summarizes the accelerator and experiment operations for FY 2004. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2004 Run II at the Tevatron Collider, the MiniBooNE neutrino experiment, and SY 120 activities.

Bromberg, C.; Conrad, J.; Denisov, D.; Holmes, S.; Louis, W.; Meyer, A.; Moore, Craig D.; Raja, R.; Ramberg, E.; Roser, R.; /Fermilab

2004-12-01T23:59:59.000Z

484

Hydrologic resources management program, FY 1998 progress report  

SciTech Connect (OSTI)

This report presents the results from FY 1998 technical studies conducted by Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) project. The HRMP is sponsored by Defense Programs (DP) of the U.S. Department of Energy, Nevada Operations Office (DOE/NV), and supports DP operations at the Nevada Test Site (NTS) through studies of radiochemistry and resource management related to the defense programs mission. Other participating organizations include the Los Alamos National Laboratory (LANL), the United States Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the United States Environmental Protection Agency (EPA), and Bechtel-Nevada (BN). The UGTA project is an Environmental Management (EM) activity of DOE/NV that supports a Federal Facilities Agreement and Consent Order between the Department of Energy, the Department of Defense, and the State of Nevada. UGTA's primary function is to address the legacy release of hazardous constituents at the Nevada Test Site, the Tonopah Test Range, and off-Nevada Test Site underground nuclear testing areas. Participating contractors include LLNL (Earth and Environmental Sciences Directorate, Analytical and Nuclear Chemistry Division), LANL, DRI, USGS, BN, HSI-GeoTrans, and IT Corporation. The FY 1998 HRMP and UGTA annual progress report follows the organization and contents of our