  1. EIS-0394: FutureGen Project

    Broader source: Energy.gov [DOE]

    The EIS provides information about the potential environmental impacts of the DOE's proposal to provide federal funding to FutureGen Alliance, Inc. for the FutureGen Project. The project would include the planning, design, construction, and operation by the Alliance of a coal-fueled electric power and hydrogen gas production plant integrated with carbon dioxide capture and geologic sequestration of the captured gas.

  2. EIS-0460: FutureGen 2.0 Project, Morgan County, Illinois

    Broader source: Energy.gov [DOE]

    This EIS evaluated the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 project. Under the FutureGen 2.0 project, DOE would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation.

  3. Futuregen

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FutureGen PROJECT TIMELINE PROJECT FACT SHEET FutureGen 2.0 Fact Sheet PDF (November 2014) FUTUREGEN ALLIANCE LINKS FutureGen 2.0 Siting Guidance FutureGen Alliance Issues...

  4. FutureGen Project Report

    SciTech Connect (OSTI)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  5. SPECIAL INQUIRY Alleged Misuse of FutureGen 2.0 Project Funds

    Broader source: Energy.gov (indexed) [DOE]

    the FutureGen Industrial Alliance (Alliance) for the FutureGen 2.0 Project (Project). The Project was intended to create the world's first near-zero emissions, commercial-scale,...

  6. Secretary Chu Announces Agreement on FutureGen Project in Mattoon, IL |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Agreement on FutureGen Project in Mattoon, IL Secretary Chu Announces Agreement on FutureGen Project in Mattoon, IL June 12, 2009 - 12:00am Addthis Washington, D.C. - U.S. Secretary of Energy Steven Chu today announced an agreement with the FutureGen Alliance that advances the construction of the first commercial scale, fully integrated, carbon capture and sequestration project in the country in Mattoon, Illinois. "This important step forward for FutureGen reflects

  7. U.S. and India Sign Historic Agreement on FutureGen Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Sign Historic Agreement on FutureGen Project U.S. and India Sign Historic Agreement on FutureGen Project April 3, 2006 - 10:02am Addthis India to Participate in World's First Integrated CO2 Sequestration and Hydrogen Production Research Power Plant, FutureGen Initiative NEW DELHI, INDIA - The U.S. Department of Energy (DOE) announced the signing of an agreement with India that makes it the first country to join the U.S. on the government steering committee for the FutureGen

  8. EIS-0460: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to ...

  9. EIS-0394: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0394: Draft Environmental Impact Statement FutureGen Project The EIS provides information about the potential environmental impacts of the ...

  10. EIS-0460: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a ...

  11. U.S. and India Reach Historic Agreement on FutureGen Project | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Reach Historic Agreement on FutureGen Project U.S. and India Reach Historic Agreement on FutureGen Project March 2, 2006 - 11:34am Addthis India becomes the first nation to accept U.S. invitation to participate in new clean coal project WASHINGTON, DC - President George W. Bush announced today that India will become the first country to participate on the government steering committee for the U.S. Department of Energy's FutureGen project - an initiative to build and operate the

  12. Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase | Department of Energy FutureGen 2.0 Project Moves Forward Into Second Phase Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase February 4, 2013 - 7:25pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Following the successful completion of the first phase, the Energy Department today announced the beginning of Phase II of project development with a new cooperative agreement between the FutureGen Industrial Alliance and the Department of Energy for

  13. Secretary Chu Announces Agreement on FutureGen Project in Mattoon, Illinois

    Broader source: Energy.gov [DOE]

    U.S. Secretary of Energy Steven Chu today announced an agreement with the FutureGen Alliance that advances the construction of the first commercial scale, fully integrated, carbon capture and sequestration project in the country in Mattoon, Illinois.

  14. Carbon Capture and Storage FutureGen 2.0 Project Moves Forward...

    Office of Environmental Management (EM)

    In cooperation with the FutureGen project partners, the Department of Energy is investing in the upgrade of a coal-fired power plant in Meredosia, Ill. with oxy-combustion ...

  15. Record of Decision Issued for the FutureGen 2.0 Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has decided to provide financial assistance to the FutureGen Industrial Alliance (the Alliance) for the FutureGen 2.0 Project. DOE will provide approximately $1 billion of in cost-shared funding (the majority of which was appropriated under the American Recovery and Reinvestment Act) through cooperative agreements with the Alliance, as described in DOE's Record of Decision (ROD).

  16. DOE Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has issued the Final Environmental Impact Statement for the FutureGen 2.0 Project.

  17. EIS-0460: EPA Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated

  18. FutureGen Industrial Alliance Announces Carbon Storage Site Selection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process for FutureGen 2.0 | Department of Energy Industrial Alliance Announces Carbon Storage Site Selection Process for FutureGen 2.0 FutureGen Industrial Alliance Announces Carbon Storage Site Selection Process for FutureGen 2.0 October 6, 2010 - 12:00am Addthis WASHINGTON -- The FutureGen Industrial Alliance today announced details of a process that will lead to the selection of an Illinois site for the storage of carbon dioxide (CO2) collected at FutureGen 2.0, a landmark project that

  19. EIS-0472: EPA Notice of Availability of Final Programmatic Environmental

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to provide approximately $1 billion in cost-shared American Recovery and Reinvestment Act funding to the FutureGen Industrial Alliance, Inc. (Alliance) to support the planning, design, construction, and operation of a prototype power plant, including the capture, conveyance, and

  20. Geochemical Monitoring Considerations for the FutureGen 2.0 Project

    SciTech Connect (OSTI)

    Amonette, James E.; Johnson, Timothy A.; Spencer, Clayton F.; Zhong, Lirong; Szecsody, James E.; Vermeul, Vince R.

    2014-12-31

    Geochemical monitoring is an essential component of a suite of monitoring technologies designed to evaluate CO2 mass balance and detect possible loss of containment at the FutureGen 2.0 geologic sequestration site near Jacksonville, IL. This presentation gives an overview of the potential geochemical approaches and tracer technologies that were considered, and describes the evaluation process by which the most cost-effective and robust of these were selected for implementation

  1. Geophysical Monitoring Methods Evaluation for the FutureGen 2.0 Project

    SciTech Connect (OSTI)

    Strickland, Chris E.; USA, Richland Washington; Vermeul, Vince R.; USA, Richland Washington; Bonneville, Alain; USA, Richland Washington; Sullivan, E. Charlotte; USA, Richland Washington; Johnson, Tim C.; USA, Richland Washington; Spane, Frank A.; USA, Richland Washington; Gilmore, Tyler J.; USA, Richland Washington

    2014-12-31

    A comprehensive monitoring program will be needed in order to assess the effectiveness of carbon sequestration at the FutureGen 2.0 carbon capture and storage (CCS) field-site. Geophysical monitoring methods are sensitive to subsurface changes that result from injection of CO2 and will be used for: (1) tracking the spatial extent of the free phase CO2 plume, (2) monitoring advancement of the pressure front, (3) identifying or mapping areas where induced seismicity occurs, and (4) identifying and mapping regions of increased risk for brine or CO2 leakage from the reservoir. Site-specific suitability and cost effectiveness were evaluated for a number of geophysical monitoring methods including: passive seismic monitoring, reflection seismic imaging, integrated surface deformation, time-lapse gravity, pulsed neutron capture logging, cross-borehole seismic, electrical resistivity tomography, magnetotellurics and controlled source electromagnetics. The results of this evaluation indicate that CO2 injection monitoring using reflection seismic methods would likely be difficult at the FutureGen 2.0 site. Electrical methods also exhibited low sensitivity to the expected CO2 saturation changes and would be affected by metallic infrastructure at the field site. Passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture monitoring were selected for implementation as part of the FutureGen 2.0 storage site monitoring program.

  2. Geophysical Monitoring Methods Evaluation for the FutureGen 2.0 Project

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Strickland, Chris E.; USA, Richland Washington; Vermeul, Vince R.; USA, Richland Washington; Bonneville, Alain; USA, Richland Washington; Sullivan, E. Charlotte; USA, Richland Washington; Johnson, Tim C.; USA, Richland Washington; et al

    2014-12-31

    A comprehensive monitoring program will be needed in order to assess the effectiveness of carbon sequestration at the FutureGen 2.0 carbon capture and storage (CCS) field-site. Geophysical monitoring methods are sensitive to subsurface changes that result from injection of CO2 and will be used for: (1) tracking the spatial extent of the free phase CO2 plume, (2) monitoring advancement of the pressure front, (3) identifying or mapping areas where induced seismicity occurs, and (4) identifying and mapping regions of increased risk for brine or CO2 leakage from the reservoir. Site-specific suitability and cost effectiveness were evaluated for a number ofmore » geophysical monitoring methods including: passive seismic monitoring, reflection seismic imaging, integrated surface deformation, time-lapse gravity, pulsed neutron capture logging, cross-borehole seismic, electrical resistivity tomography, magnetotellurics and controlled source electromagnetics. The results of this evaluation indicate that CO2 injection monitoring using reflection seismic methods would likely be difficult at the FutureGen 2.0 site. Electrical methods also exhibited low sensitivity to the expected CO2 saturation changes and would be affected by metallic infrastructure at the field site. Passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture monitoring were selected for implementation as part of the FutureGen 2.0 storage site monitoring program.« less

  3. OpenEI:Projects | Open Energy Information

    Open Energy Info (EERE)

    via one or more project pages within the "OpenEI:" wiki namespace. Anyone is free to participate in any projects. If you'd like to start an OpenEI Project, simply create...

  4. EIS-0456: Cushman Hydroelectric Project, Tacoma, Washington

    Broader source: Energy.gov [DOE]

    This EIS is for the design and construction of certain components of the Cushman Hydroelectric Project in Mason County, Washington.

  5. EIS-0460: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Record of Decision EIS-0460: Record of Decision FutureGen 2.0 Project, Morgan County, Illinois DOE has decided to proceed with cost-shared funding for the FutureGen 2.0 Project, providing the Alliance with $1 billion through cooperative agreements to support the planning, design, construction, and operation of a prototype power plant, including the capture, conveyance, and sequestration of carbon dioxide (CO2). EIS-0460-ROD-FRversion-2014.pdf (233.4 KB) More Documents & Publications

  6. FutureGen Industrial Alliance Announces Carbon Storage Site Selection Process for FutureGen 2.0

    Broader source: Energy.gov [DOE]

    The FutureGen Industrial Alliance today announced details of a process that will lead to the selection of an Illinois site for the storage of carbon dioxide collected at FutureGen 2.0, a landmark project that will advance the deployment of carbon capture and storage technology at an Ameren Energy Resources power plant in Meredosia, Illinois.

  7. EIS-0448: First Solar Desert Sunlight Project in Riverside County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: First Solar Desert Sunlight Project in Riverside County, CA EIS-0448: First Solar Desert Sunlight Project in Riverside County, CA June 24, 2011 EIS-0448: Final Environmental ...

  8. EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Cape Wind Energy Project, Nantucket Sound, Offshore of Massachusetts EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore of Massachusetts EIS-0470: Cape Wind Energy ...

  9. EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Solar Millennium Blythe Solar Power Project in Riverside County, CA EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside County, CA December 10, 2010 EIS-0449: ...

  10. EIS-0431: Hydrogen Energy California's Project, Kern County,...

    Energy Savers [EERE]

    31: Hydrogen Energy California's Project, Kern County, California EIS-0431: Hydrogen Energy California's Project, Kern County, California Summary This EIS evaluates the potential...

  11. EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens...

    Energy Savers [EERE]

    407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS EIS-0407: Final Environmental ...

  12. EIS-0410: Keystone Oil Pipeline Project

    Broader source: Energy.gov [DOE]

    This environmental impact statement (EIS) analyzes the environmental impacts of the TransCanada Keystone Oil Pipeline Project. The U.S. Department of State (DOS) was the lead agency. The U.S. Department of Energy's (DOE's) Western Power Administration (Western) participated as a cooperating agency in the preparation of this EIS in order to address Western's proposed response to interconnection requests from Minnkota Power Cooperative, Central Power Electric Cooperative, and East River Electric Power Cooperative requiring modification of three existing Western substation facilities and construction of one new tap facility. DOE adopted the DOS Final EIS as DOE/EIS-0410 on January 21, 2009.

  13. FutureGen Industrial Alliance Announces Carbon Storage Site Selection...

    Office of Environmental Management (EM)

    at FutureGen 2.0, a landmark project that will advance the deployment of carbon capture and storage technology at an Ameren Energy Resources power plant in Meredosia, Illinois. ...

  14. FutureGen Alliance Formally Seeking Proposals for CO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 25, 2010 For Immediate Release Contact: Lawrence Pacheco (202) 346-8855 lawrence.pacheco@fd.com FutureGen Alliance Formally Seeking Proposals for CO 2 Storage Site Springfield, Ill. - The FutureGen Alliance released a Request for Site Proposals (RFP) today for communities that would like to be considered to host the carbon dioxide (CO 2 ) storage site for the FutureGen 2.0 project. Participating locations must declare their intent to submit a proposal by November 3, 2010, and will have

  15. EIS-0321: Condon Wind Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of executing one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the...

  16. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  17. EIS-0499: Great Northern Transmission Line Project, Minnesota...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: Great Northern Transmission Line Project, Minnesota Summary This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to ...

  18. EIS-0419: Whistling Ridge Energy Project; Skamania County, Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0419: Whistling Ridge Energy Project; Skamania County, Washington Summary DOE's Bonneville Power Administration prepared an EIS that evaluates the potential environmental ...

  19. Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, Illinois

    Broader source: Energy.gov [DOE]

    The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country.

  20. DOE FutureGen Alliance Discuss Ne | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Release Release Date: August 20, 2010 Department of Energy and FutureGen Alliance Discuss Next Steps for FutureGen 2.0 in Illinois Washington, D. C. - Officials from the Department of Energy, the state of Illinois, Ameren, Babcock & Wilcox, American Air Liquide and the FutureGen Alliance discussed the next steps for the FutureGen 2.0 carbon capture and storage project in Illinois. The project remains on track for obligation before the end of September. Preparations will then begin for

  1. EIS-0393: Montanore Project; Montana

    Broader source: Energy.gov [DOE]

    The USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality prepared an EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE’s Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and two substations needed for powering the mine facilities if the proposed action is implemented.

  2. EIS-0340: Oregon Hatchery Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes the environmental impacts of developing additional facilities and modifications to existing facilities built for the Lower Snake River Compensation Plan in order to mitigate impacts to natural populations of spring chinook salmon in the Grande Ronde and Imnaha River basins caused by DOE’s Bonneville Power Administration’s operation of four federal dams on the lower Snake River. The U.S. Fish and Wildlife Service, U.S. Department of the Interior, and the U.S. Forest Service, Department of Agriculture, are cooperating agencies.

  3. EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Massachusetts | Department of Energy 0: Cape Wind Energy Project, Nantucket Sound, Offshore of Massachusetts EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore of Massachusetts June 25, 2014 EIS-0470: Cape Wind Energy Project, Final General Conformity Determination Cape Wind Energy Project, Final General Conformity Determination, June 23, 2014 December 21, 2012 EIS-0470: Final Environmental Impact Statement Cape Wind Energy Project, Nantucket Sound, MA December 31, 2012 EIS-0470:

  4. EIS-0394: Record of Decision | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    an environmental impact statement (EIS) to assess the potential environmental impacts associated with the proposed action of providing Federal financial assistance to the FutureGen...

  5. Category:OpenEI Projects | Open Energy Information

    Open Energy Info (EERE)

    Oil and Gas P cont. OpenEI:ProjectsPublic Resources OpenEI:ProjectsSearch Engine Optimization Retrieved from "http:en.openei.orgwindex.php?titleCategory:OpenEIProjects&old...

  6. EIS-0455: Genesis Solar Energy Project in Riverside County, CA...

    Energy Savers [EERE]

    5: Genesis Solar Energy Project in Riverside County, CA EIS-0455: Genesis Solar Energy Project in Riverside County, CA December 17, 2010 EIS-0455: Notice of Adoption of an ...

  7. EIS-0298: Telephone Flat Geothermal Development Project

    Broader source: Energy.gov [DOE]

    This EIS is for a Plan of Operation (POO) for Development and Production; and for a POO for Utilization and Disposal for a proposed geothermal development project, including: a power plant, geothermal production and injection wellfield, ancillary facilities, and transmission line on the Modoc National Forest in Siskiyou and Modoc Counties, California.

  8. EIS-0492: Oregon LNG Export Project (Warrenton, OR) and Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA) EIS-0492: Oregon LNG Export Project (Warrenton, OR) and Washington ...

  9. EIS-0394: Advance Notice of Intent to Prepare an Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Advance Notice of Intent to Prepare an Environmental Impact Statement EIS-0394: Advance Notice of Intent to Prepare an Environmental Impact Statement Implementation of the FutureGen Project The U.S. Department of Energy (DOE) is announcing in advance its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 et seq.), for the proposed action of providing Federal funding (up

  10. EIS-0501: FERC Project Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FERC Project Update EIS-0501: FERC Project Update Golden Pass LNG Export and Pipeline Project, Texas and Louisiana After conducting scoping for an EA for the proposed Golden Pass LNG terminal and pipeline project, FERC issued a project update that announced that, due to changes in the project location and scope, it would prepare an EIS instead. DOE, Office of Fossil Energy - a cooperating agency in preparing the EIS - has an obligation under Section 3 of the Natural Gas Act to authorize the

  11. EIS-0489: Jordan Cove Liquefaction Project (Coos County, OR)...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) EIS-0489: Jordan Cove Liquefaction ...

  12. EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana Summary The Federal Energy Regulatory ...

  13. EIS-0516: Clean Path Energy Center Project; San Juan County,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Path Energy Center Project; San Juan County, New Mexico EIS-0516: Clean Path Energy Center Project; San Juan County, New Mexico Summary DOE's Western Area Power Administration is ...

  14. EIS-0496: San Luis Transmission Project; Alameda, Merced, San...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: San Luis Transmission Project; Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project; Alameda, Merced, San Joaquin and...

  15. EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline...

    Energy Savers [EERE]

    Counties, Texas, and Cameron Parish, Louisiana EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline Project; Jefferson and Orange Counties, Texas, and Cameron ...

  16. EIS-0520: Texas LNG Project; Cameron County, Texas | Department...

    Office of Environmental Management (EM)

    20: Texas LNG Project; Cameron County, Texas EIS-0520: Texas LNG Project; Cameron County, Texas Summary The Federal Energy Regulatory Commission (FERC) announced its intent to ...

  17. EIS-0518: Annova LNG Brownsville Project; Cameron County, Texas...

    Office of Environmental Management (EM)

    18: Annova LNG Brownsville Project; Cameron County, Texas EIS-0518: Annova LNG Brownsville Project; Cameron County, Texas Summary The Federal Energy Regulatory Commission (FERC) ...

  18. EIS-0509: Mississippi River LNG Project, Plaquemines Parish,...

    Office of Environmental Management (EM)

    9: Mississippi River LNG Project, Plaquemines Parish, Louisiana EIS-0509: Mississippi River LNG Project, Plaquemines Parish, Louisiana SUMMARY The Federal Energy Regulatory ...

  19. EIS-0498: Magnolia LNG and Lake Charles Expansion Projects; Calcasieu...

    Office of Environmental Management (EM)

    8: Magnolia LNG and Lake Charles Expansion Projects; Calcasieu Parish, Louisiana EIS-0498: Magnolia LNG and Lake Charles Expansion Projects; Calcasieu Parish, Louisiana Summary The ...

  20. EIS-0501: Golden Pass LNG Export Project; Texas and Louisiana...

    Office of Environmental Management (EM)

    1: Golden Pass LNG Export Project; Texas and Louisiana EIS-0501: Golden Pass LNG Export Project; Texas and Louisiana Summary The Federal Energy Regulatory Commission (FERC) is ...

  1. EIS-0504: Gulf LNG Liquefaction Project, Jackson County, Mississippi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Gulf LNG Liquefaction Project, Jackson County, Mississippi EIS-0504: Gulf LNG Liquefaction Project, Jackson County, Mississippi SUMMARY The Federal Energy Regulatory Commission ...

  2. EIS-0508: Downeast LNG Import-Export Project, Robbinston, Maine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Downeast LNG Import-Export Project, Robbinston, Maine EIS-0508: Downeast LNG Import-Export Project, Robbinston, Maine SUMMARY The Federal Energy Regulatory Commission (FERC) is ...

  3. Final EIS Keystone Pipeline Project Appendix E Pipeline Restrictive...

    Energy Savers [EERE]

    Pipeline Project Route Appendix G Public Water Supply Wells Within One Mile of the ... EIS Keystone Pipeline Project Public Water Supplies (PWS Wells and Wellhead ...

  4. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Line Project; Arizona and New Mexico EIS-0474: Southline Transmission Line Project; Arizona and New Mexico Summary The Bureau of Land Management and Western ...

  5. EIS-0370: Windy Gap Firming Project, Colorado

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Department of the Interior (Bureau of Reclamation, Great Plains Region), with DOE's Western Area Power Administration as a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction over the transmission line that would be relocated if the proposed action is implemented and would market additional power that may be generated as a result of the project.

  6. EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KS | Department of Energy 07: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS August 20, 2010 EIS-0407: Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas October 6, 2011 EIS-0407: Record of Decision Issuance of a Loan Guarantee to Abengoa Bioenergy Biomass of Kansas, LLC for the Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas

  7. EIS-0498: Magnolia LNG and Lake Charles Expansion Projects; Calcasieu...

    Energy Savers [EERE]

    with the public interest. EIS-0498: Magnolia LNG and Lake Charles Expansion Projects Public Comment Opportunities No public comment opportunities available at this time....

  8. EIS-0494: Excelerate Liquefaction Solutions Lavaca Bay LNG Project...

    Broader source: Energy.gov (indexed) [DOE]

    gas from existing pipeline systems to the LNG terminal facilities. EIS-0494: Excelerate Liquefaction Solutions Lavaca Bay LNG Project Public Comment Opportunities No public ...

  9. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  10. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colusa and Sutter Counties, California EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California Summary Western Area Power ...

  11. EIS-0439: Rice Solar Energy Project in Riverside County, CA ...

    Broader source: Energy.gov (indexed) [DOE]

    March 29, 2010 EIS-0439: Notice of Intent to Prepare an Environmental Impact Statement Proposed Construction and Operation of the Rice Solar Energy Project, Riverside County, CA ...

  12. EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project...

    Broader source: Energy.gov (indexed) [DOE]

    Documents Available for Download February 11, 2011 EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project February 11, 2011 ...

  13. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...

    Energy Savers [EERE]

    Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental...

  14. EIS-0401: NextGen Project, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS analyzes WAPA's proposed action for the construction and operation of the proposed NextGen Energy Facility (Project) in South Dakota.

  15. EIS-0315-S1: SEIS on Caithness Big Sandy Project

    Broader source: Energy.gov [DOE]

    In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS.

  16. EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project...

    Office of Environmental Management (EM)

    19: Rio Grande LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, Willacy, and Cameron Counties, Texas EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project; ...

  17. Fossil energy, clean coal technology, and FutureGen

    SciTech Connect (OSTI)

    Sarkus, T.A.

    2008-07-15

    Future fossil use will rely heavily on carbon sequestration. Clean coal technologies are being incorporated in the USA, including air pollution control, and will need to incorporate carbon capture and sequestration. The paper ends with an outline of the restructured FutureGen project. 7 figs.

  18. EIS-0393: Montanore Project; Montana | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0393: Montanore Project; Montana EIS-0393: Montanore Project; Montana Summary The USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality prepared an EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and two substations needed for

  19. U.S. and China Announce Cooperation on FutureGen and Sign Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protocol at U.S.-China Strategic Economic Dialogue | Department of Energy Announce Cooperation on FutureGen and Sign Energy Efficiency Protocol at U.S.-China Strategic Economic Dialogue U.S. and China Announce Cooperation on FutureGen and Sign Energy Efficiency Protocol at U.S.-China Strategic Economic Dialogue December 15, 2006 - 9:46am Addthis BEIJING, CHINA - The United States and China today announced that China will join the Government Steering Committee of the FutureGen project making

  20. FutureGen Industrial Alliance Inc | Open Energy Information

    Open Energy Info (EERE)

    FutureGen Industrial Alliance Inc Jump to: navigation, search Name: FutureGen Industrial Alliance Inc Place: Washington, Washington, DC Zip: 20006 Product: The FutureGen Industrial...

  1. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, ...

  2. EIS-0249: Medical Isotopes Production Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to establish a production capability for molybdenum-99 (Mo-99) and related medical isotopes.

  3. EIS-0072: Great Plains Gasification Project, Mercer County, North Dakota

    Broader source: Energy.gov [DOE]

    The Office of Fossil Energy prepared this EIS to evaluate the impacts of a project to construct a 125 million cubic feet per day coal gasification facility located in Mercer County, North Dakota. The Office of Fossil Energy adopted three environmental impact evaluation documents prepared by other Federal agencies to develop this EIS.

  4. Back to the FutureGen?

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2009-04-15

    After years of political wrangling, Democrats may green-light the experimental clean coal power plants. The article relates how the project came to be curtailed, how Senator Dick Durbin managed to protect $134 million in funding for FutureGen in Mattoon, and how once Obama was in office a $2 billion line item to fund a 'near zero emissions power plant(s)' was placed in the Senate version of the Stimulus Bill. The final version of the legislation cut the funding to $1 billion for 'fossil energy research and development'. In December 2008 the FutureGen Alliance and the City of Mattoon spent $6.5 billion to purchase the plants eventual 440 acre site. A report by the Government Accountability Office (GAO) said that Bush's inaction may have set back clean coal technology in the US by as much as a decade. If additional funding comes through construction of the plant could start in 2010. 1 fig., 1 photo.

  5. EIS-0374: Klondike III/ Bigelow Canyon Wind Integration Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to approve an interconnection requested by PPM Energy, Inc. (PPM) to integrate electrical power from their proposed Klondike III Wind roject (Wind Project) into the Federal Columbia River Transmission System (FCRTS).

  6. EIS-0289: JEA Circulating Fluidized Bed Combustor Project

    Broader source: Energy.gov [DOE]

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the...

  7. EIS-0346: Salmon Creek Project, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to fund activities that would restore sufficient water flows to Salmon Creek and rehabilitate its streambed as necessary to provide adequate passage for summer steelhead (Oncorhynchus mykiss) and possibly spring chinook (O. tshawytscha).

  8. EIS-0322: Sundance Energy Project, Arizona

    Broader source: Energy.gov [DOE]

    This EIS analyzes Western Area Power Administration (Western) decision to approve Sundance Energy LLC (Sundance) to interconnect a planned generator facility to Westerns transmission system in the vicinity of Coolidge, Arizona.

  9. EIS-0491: Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 491: Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana EIS-0491: Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Summary The Federal Energy Regulatory Commission (FERC) prepared an EIS that assesses the potential environmental impacts in the states of Arkansas, Mississippi, and Louisiana, of a proposal 1) to expand an existing liquefied natural gas (LNG) import terminal in Calcasieu Parish, Louisiana, by constructing and operating natural gas

  10. EIS-0230: Resource Contingency Program, Hermiston Power Project

    Broader source: Energy.gov [DOE]

    "The Bonneville Power Administration (BPA) prepared this environmental impact statement (EIS) to analyze the environmental impacts of implementing a Resource Contingency Program near Hermiston, Oregon, one of three proposed locations to carry out this program, which allows BPA to acquire power to supply to its customers if and when needed. In September 1993, BPA published a Notice of Intent to prepare an EIS on projects at three sites and in October 1993 held public scoping meetings at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. BPA concluded that publication of the final EIS should be separated into two documents, and presented the final analysis of the impacts of the other two sites in another document. This EIS addresses three proposed alternatives: the proposed action, no action, and other actions. The proposed action is the acquisition of power from both units optioned at the Hermiston Power Project Plant site (only if there is a need for power at a future date), or wheeling of power by BPA if another party acquires the output. This EIS addresses the environmental effects of constructing and operating both units under option for power delivery to BPA."

  11. EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA Documents Available for Download EIS-0458: Final Environmental Impact Statement EIS-0458: DOE Notice of ...

  12. EIS-0169: Yakima River Basin Fisheries Project

    Broader source: Energy.gov [DOE]

    This EIS assesses the potential impacts of the Bangor Hydro-electric Tranmission Line and associated infrastructure, including adding an alternative acclimation site, water rights issues and discussion of irrigation water availability, adding more information on recreation impacts, and clarifying agency roles and responsibilities.

  13. EIS-0315: Caithness Big Sandy Project, Wikieup, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve Big Sandy Energy to interconnect a proposed 720-MW generating facility near Wikieup, Ariz., with the Mead-Phoenix Project 500-kV transmission line. The powerplant plan includes a proposed high-pressure natural gas pipeline, permanent access road and water pipelines that would cross BLM-administered land. Because the project could 'significantly affect the quality of the human environment,' studies must be done to identify environmental effects. WAPA is partnering with the Bureau of Land Management in Kingman on this project. BLM and Western have delayed issuing the Supplemental Draft EIS at the request of the applicant, Caithness Energy."

  14. FutureGen Project Report

    SciTech Connect (OSTI)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This document is the continuation of the one reported as OSTI ID = 1116018. The full text file was divided into two parts, of which this is the second.

  15. EIS-0431: Hydrogen Energy California's Project, Kern County, California

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to provide financial assistance for the construction and operation of Hydrogen Energy California's LLC project, which would produce and sell electricity, carbon dioxide and fertilizer. DOE selected this project for an award of financial assistance through a competitive process under the Clean Coal Power Initiative program.

  16. EIS-0409: Kemper County Integrated Gasification Combined Cycle Project, Mississippi

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to provide funding for the Kemper County Integrated Gasification Combined Cycle Project in Kemper County, Mississippi to assess the potential environmental impacts associated with the construction and operation of a project proposed by Southern Power Company, through its affiliate Mississippi Power Company, which has been selected by DOE for consideration under the Clean Coal Power Initiative (CCPI) program.

  17. EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.

    Broader source: Energy.gov [DOE]

    This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

  18. EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Bureau of Land Management with DOE’s Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western’s transmission lines.

  19. EIS-0460: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    To Prepare an Environmental Impact Statement and Notice of Potential Floodplain and Wetlands Involvement for the FutureGen 2.0 Program, EIS-0460 (May 2011) (76 FR 29728) More...

  20. EIS-0513: Jacksonville Project, Jacksonville, Florida

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, is preparing an EIS that analyzes the potential environmental impacts of a proposal to construct and operate a natural gas liquefaction, storage, and export facility on the St. Johns River in Jacksonville, Florida. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the export of natural gas, including liquefied natural gas, unless it finds that the export is not consistent with the public interest.

  1. EIS-0455: Genesis Solar Energy Project in Riverside County, CA | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 5: Genesis Solar Energy Project in Riverside County, CA EIS-0455: Genesis Solar Energy Project in Riverside County, CA December 17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA August 27, 2010 EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA September 1, 2011 EIS-0455: Record of Decision Genesis Solar Energy Project, Riverside County, California

  2. EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside County,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CA | Department of Energy 9: Solar Millennium Blythe Solar Power Project in Riverside County, CA EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside County, CA December 10, 2010 EIS-0449: Notice of Adoption of the Final Environmental Impact Statement Blythe Solar Power Project December 10, 2010 EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project

  3. EIS-0308: Southpoint Power Plant Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EIS analyzes the U.S. Department of the Interior Bureau of Indian Affairs’ proposed lease of acreage on the Fort Mojave Indian Reservation in Mohave County, Arizona for development of a natural gas-fired 500 megawatt combined cycle power plant. DOE's Western Area Power Administration (WAPA) is a cooperating agency, and the plant would supply power to the WAPA grid. The proposed Southpoint power plant would require construction of an off-site substation and two 230 kV transmission lines in order to wheel power to WAPA’s distribution grid. An Environmental Assessment (EA) for the proposed substation and transmission line was prepared with the Department of the Interior Bureau of Land Management as lead agency and WAPA as a cooperating agency, and a Finding of No Significant Impact was approved on December 2, 1997.

  4. EIS-0184: South Fork Tolt River Hydroelectric Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes the Seattle City Light, a Department of the City of Seattle proposal to construct a hydroelectric project with an installed capacity of 15 MW on the South Fork Tolt River near the town of Carnation located in King County in the State of Washington.

  5. EIS-0397: Lyle Falls Fish Passage Project, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to modify funding to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, WA. The proposed project would help BPA meet its off-site mitigation responsibilities for anadromous fish affected by the development of the Federal Columbia River Power System and increase overall fish production in the Columbia Basin.

  6. EIS-0511: Aguirre Offshore GasPort Project, Puerto Rico

    Broader source: Energy.gov [DOE]

    FERC prepared an EIS with 10 cooperating agencies, including DOE, for the proposed Aguirre Offshore GasPort Project. The proposal would include construction and operation of a marine LNG-receiving facility about 1 mile outside of Jobos Bay, near the towns of Salinas and Guayama, Puerto Rico, and a 4-mile subsea pipeline connecting to the Aguirre Plant in Salinas.

  7. EIS-0415: Deer Creek Station Energy Facility Project, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS analyzes WAPA's decision to approve the interconnection request made by Basin Electric Power Cooperative (Basin Electric) with the USDA Rural Utilities Service (RUS) proposing to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility.

  8. EIS-0404: Los Vaqueros Reservoir Expansion Project, California

    Broader source: Energy.gov [DOE]

    This EIS/Environmental Impact Report was prepared by the Department of the Interior (Bureau of Reclamation, Mid-Pacific Region) and the Contra Costa Water District to evaluate the environmental impacts of a proposal to enlarge the existing Los Vaqueros Reservoir in Contra Costa County, California. DOE’s Western Area Power Administration (Western) was a cooperating agency because it has jurisdiction over transmission facilities that were expected to be relocated under the proposed action. Based on project changes, however, Western has no action and therefore will not adopt the EIS or issue a ROD.

  9. EIS-0487: Freeport LNG Liquefaction Project, Brazoria County, Texas

    Broader source: Energy.gov [DOE]

    Federal Energy Regulatory Commission (FERC) prepared an EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and associated facilities in Brazoria County, Texas, to enable the terminal to liquefy and export LNG. DOE, Office of Fossil Energy – a cooperating agency in preparing the EIS – has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest.

  10. EIS-0439: Rice Solar Energy Project in Riverside County, CA | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 9: Rice Solar Energy Project in Riverside County, CA EIS-0439: Rice Solar Energy Project in Riverside County, CA March 29, 2010 EIS-0439: Notice of Intent to Prepare an Environmental Impact Statement Proposed Construction and Operation of the Rice Solar Energy Project, Riverside County, CA October 22, 2010 EIS-0439: EPA Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, California October 22, 2010 EIS-0439: Draft

  11. EIS-0448: First Solar Desert Sunlight Project in Riverside County, CA |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 8: First Solar Desert Sunlight Project in Riverside County, CA EIS-0448: First Solar Desert Sunlight Project in Riverside County, CA June 24, 2011 EIS-0448: Final Environmental Impact Statement Desert Sunlight Solar Farm Project, California June 24, 2011 EIS-0448: Notice of Adoption of an Environmental Impact Statement First Solar Desert Sunlight Solar Farm Project October 6, 2011 EIS-0448: Record of Decision Issuance of a Loan Guarantee to First Solar, Inc., for the

  12. EIS-0427: Grapevine Canyon Wind Project, Coconino County, Arizona

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National Forest and interconnect with DOE’s Western Area Power Administration’s existing Glen Canyon-Pinnacle Peak transmission lines.

  13. EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project in Nye

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County, NV | Department of Energy EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project in Nye County, NV EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project in Nye County, NV Documents Available for Download February 11, 2011 EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project February 11, 2011 EIS-0454: Notice of Adoption of an Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy

  14. EIS-0439: Rice Solar Energy Project, Riverside County, California

    Broader source: Energy.gov [DOE]

    This environmental review was prepared by DOE’s Western Area Power Administration with the Department of the Interior’s Bureau of Land Management (BLM) as a cooperating agency. This EIS evaluates the environmental impacts of the Rice Solar Energy Project, a 150-megawatt solar concentrating electric powerplant proposed to be constructed on private land in the Sonoran Desert. DOE’s Western Area Power Administration actions under this proposal include building and operating a new substation to interconnect the solar project to Western’s transmission system. DOE may also use this EIS as part of its decision whether to issue a Federal loan guarantee to support the proposal. BLM’s actions under this proposal includes amending California Desert Conservation Area Plan to designate a new corridor for a 161-kV transmission line, which would facilitate the development of solar energy on private lands.

  15. EIS-0214: Northwest Regional Power Facility Project

    Broader source: Energy.gov [DOE]

    This environmental impact statement analyzes the WA Power LLC proposal to construct and operate a 838 megawatt gas-fired combustion turbine facility near the town of Creston, Washington. The project site is approtiately 1,200 acres, of which less than 140 acres be impacted.

  16. EIS-0382: Mesaba Energy Project Itasca County, Minnesota

    Broader source: Energy.gov [DOE]

    NOTE: All DOE funding has been expended. This EIS evalutes the environmental impacts of a proposal to construct and demonstrate a commercial utility-scale next-generation Integrated Gasification Combined Cycle (IGCC) electric power generating facility having a capacity of 606 MWe (net). It will incorporate over 1,600 design and operational lessons learned from the successful but smaller-scale 262 MWe (net) Wabash River Coal Gasification Repowering Project, located in Terre Haute, Indiana.

  17. EIS-0370: Windy Gap Firming Project; North Central Colorado

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Department of the Interior (Bureau of Reclamation, Great Plains Region), with DOE's Western Area Power Administration as a cooperating agency, evaluates the environmental impacts of a proposal to construct new water storage reservoir capacity southwest of Loveland, Colorado. Western has jurisdiction over the transmission line that would be relocated if the proposed action is implemented and would market additional power that may be generated as a result of the project.

  18. EIS-0207: Newberry Geothermal Pilot Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Forest Service prepared this statement to analyze three alternatives and associated environmental impacts for it to enable the CEE Exploration Company of Portland, Oregon to build and operate a geothermal pilot project and supporting facilities capable of generating 33 megawatts of electric power in the Deschutes National Forest in central Oregon. The Department of Energys Bonneville Power Administration (BPA) served as a cooperating agency in preparing this statement in order to fulfill its National Environmental Policy Act obligations ahead of its statutory obligations to purchase and transmit power to customers in the Pacific Northwest, if it is decided that the project will proceed. BPA adopted this statement by October 1994.

  19. EIS-0153: Niagara Import Point Project

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of the proposed Niagara Import Point project that would construct an interstate natural gas pipeline to transport gas from Canada and domestic sources to the Northeastern United States market. The U.S. Department of Energy's Office of Fossil Energy was a cooperating agency during statement development and adopted this statement on 6/15/1990.

  20. EIS-0443: Southwest Intertie Project-South (SWIP-S), White Pine, Nye,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lincoln, and Clark counties, NV | Department of Energy 3: Southwest Intertie Project-South (SWIP-S), White Pine, Nye, Lincoln, and Clark counties, NV EIS-0443: Southwest Intertie Project-South (SWIP-S), White Pine, Nye, Lincoln, and Clark counties, NV Documents Available for Download October 26, 2010 EIS-0443: Record of Decision Project Financing for Southwest Intertie Project - South February 19, 2010 EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie

  1. EIS-0486: Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

  2. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Delaware | Department of Energy 5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware February 4, 2011 EIS-0465: Announcement of Public Scoping Meetings Construction of Phase II of

  3. Two concurrent EIS projects involving the same agencies

    SciTech Connect (OSTI)

    Thompson, M.G. ); Schaddel, T.L. . Div. of Aeronautics)

    1993-01-01

    In 1990-91 the US Air Force prepared environmental impact statements (EIS) for the disposal and reuse of Chanute Air Force Base in Rantoul, Illinois and for the joint military-civilian use of Scott Air Force Base in St. Clair County, Illinois. The Federal Aviation Administration, Chicago Airports District Office and the Illinois Department of Transportation, Division of Aeronautics were cooperating agencies for both projects. This paper summarizes the two environmental impact statements and analyzes the processes followed in preparing both documents.

  4. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    SciTech Connect (OSTI)

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  5. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  6. EIS-0183: Shepherds Flat Wind Project in Gilliam and Morrow counties, OR |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 183: Shepherds Flat Wind Project in Gilliam and Morrow counties, OR EIS-0183: Shepherds Flat Wind Project in Gilliam and Morrow counties, OR Documents Available for Download October 19, 2010 EIS-0183: Revised Record of Decision Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration

  7. EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo County,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CA | Department of Energy 8: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA Documents Available for Download August 12, 2011 EIS-0458: Final Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA August 12, 2011 EIS-0458: DOE Notice of Availability of the Final Environmental Impact Statement Proposed Loan

  8. FutureGen: Stepping-Stone to Sustainable Fossil-Fuel Power Generation

    SciTech Connect (OSTI)

    Zitney, S.E.

    2006-11-01

    This presentation will highlight the U.S. Department of Energy's FutureGen Initiative. The nearly $1 billion government-industry project is a stepping-stone toward future coal-fired power plants that will produce hydrogen and electricity with zero-emissions, including carbon dioxide. The 275-megawatt FutureGen plant will initiate operations around 2012 and employ advanced coal gasification technology integrated with combined cycle electricity generation, hydrogen production, and carbon capture and sequestration. The initiative is a response to a presidential directive to develop a hydrogen economy by drawing upon the best scientific research to address the issue of global climate change. The FutureGen plant will be based on cutting-edge power generation technology as well as advanced carbon capture and sequestration systems. The centerpiece of the project will be coal gasification technology that can eliminate common air pollutants such as sulfur dioxide and nitrogen oxides and convert them to useable by-products. Gasification will convert coal into a highly enriched hydrogen gas, which can be burned much more cleanly than directly burning the coal itself. Alternatively, the hydrogen can be used in a fuel cell to produce ultra-clean electricity, or fed to a refinery to help upgrade petroleum products. Carbon sequestration will also be a key feature that will set the Futuregen plant apart from other electric power plant projects. The initial goal will be to capture 90 percent of the plant's carbon dioxide, but capture of nearly 100 percent may be possible with advanced technologies. Once captured, the carbon dioxide will be injected as a compressed fluid deep underground, perhaps into saline reservoirs. It could even be injected into oil or gas reservoirs, or into unmineable coal seams, to enhance petroleum or coalbed methane recovery. The ultimate goal for the FutureGen plant is to show how new technology can eliminate environmental concerns over the future use of

  9. EIS-0479: North-of-the-Delta Offstream Storage Project; Sacramento-San Joaquin Delta, California

    Broader source: Energy.gov [DOE]

    The Bureau of Reclamation and California Department of Water Resources are jointly preparing an environmental impact statement/environmental impact report (EIS/EIR) for the proposed North-of-the-Delta Offstream Storage (NODOS) project, pursuant to the CALFED Bay-Delta Program Programmatic EIS/EIR Record of Decision. The NODOS EIS/EIR will evaluate potential environmental impacts of offstream surface water storage projects in the upper Sacramento River Basin. If the project is implemented, DOE’s Western Area Power Administration, a cooperating agency, could provide power to project facilities and could market hydropower generated by the project.

  10. EIS-0266: Glass Mountain/Four Mile Hill Geothermal Project, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    The EIS analyzes BPA's proposed action to approve the Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project).

  11. Department of Energy and FutureGen Alliance Discuss Next Steps for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FutureGen 2.0 in Illinois | Department of Energy FutureGen Alliance Discuss Next Steps for FutureGen 2.0 in Illinois Department of Energy and FutureGen Alliance Discuss Next Steps for FutureGen 2.0 in Illinois August 19, 2010 - 12:00am Addthis Washington, DC - At a meeting today in Chicago, officials from the Department of Energy, the state of Illinois, Ameren, Babcock & Wilcox, American Air Liquide and the FutureGen Alliance discussed the next steps for the FutureGen 2.0 carbon capture

  12. EIS-0317: Kangley-Echo Lake Transmission Line Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

  13. EIS-0330: Wallula Power Project, Walla Walla County, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposal to construct, operate, maintain, and decontaminate and decommission two depleted uranium hexafluoride (DUF 6) conversion facilities, at Portsmouth, Ohio, and Paducah, Kentucky.

  14. EIS-0383: Southern Company's Orlando Gasification Project, Orlando, FL

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to provide cost-shared funding for construction, design, and operation of a new gasification plant in Orlando, Florida.

  15. EIS-0451: Hooper Springs Transmission Project, Caribou County...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's...

  16. EIS-0393: Montanore Project, Montana | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    prepared an EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville...

  17. EIS-0352: U.S. 93 Hoover Dam Bypass Project

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration (WAPA) served as a cooperating agency for this Federal Highway Administration Environmental Impact Statement (EIS) due to WAPA’s role in the relocation of several transmission lines. The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) for construction of a new segment of U.S. Highway 93 for the purpose of improving congestion and hazardous vehicle/pedestrian conflicts where the highway crosses the Colorado River over Hoover Dam. As a cooperating agency for the EIS, WAPA proposed modifications to its transmission system and facilities to accommodate the construction of the new highway and bridge spanning the Colorado River.

  18. EIS-0443: Southwest Intertie Project-South (SWIP-S), White Pine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    White Pine, Nye, Lincoln, and Clark counties, NV EIS-0443: Southwest Intertie Project-South (SWIP-S), White Pine, Nye, Lincoln, and Clark counties, NV Documents Available for ...

  19. EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE’s Western Area Power Administration transmission system.

  20. EIS-0318: Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project, Trapp, Kentucky (Clark County)

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to provide cost-shared financial support for The Kentucky Pioneer IGCC Demonstration Project, an electrical power station demonstrating use of a Clean Coal Technology in Clark County, Kentucky.

  1. EIS-0398: Delta-Mendota Canal/California Aqueduct Intertie (DCI) Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes WAPA's decision to authorize a new interconnection and design, construct, operate, and maintain a new 69-kilovolt transmission line as part of the Delta-Mendota Canal Intertie Project.

  2. EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, Wyoming

    Broader source: Energy.gov [DOE]

    After the applicant withdrew its request to interconnect the proposed Hermosa West Wind Farm Project with Western Area Power Administration’s transmission system, Western cancelled preparation of an EIS to evaluate the potential environmental impacts of the proposal.

  3. EIS-0280: Proposed Clean Power from Integrated Coal/Ore Reduction Project (CPICOR) at Vineyard, Utah

    Broader source: Energy.gov [DOE]

    This EIS assesses the potential environmental and human health impacts of a proposed project under the Clean Coal Technology Program that would integrate the production of molten iron for steelmaking with the production of electricity.

  4. Secretary Chu Announces FutureGen | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2010 Secretary Chu Announces FutureGen 2.0 Awards $1 Billion in Recovery Act Funding for Carbon Capture and Storage Network in Illinois Washington, D.C. - Today, U.S. Energy Secretary Steven Chu and U.S. Senator Dick Durbin announced the awarding of $1 billion in Recovery Act funding to the FutureGen Alliance, Ameren Energy Resources, Babcock & Wilcox, and Air Liquide Process & Construction, Inc. to build FutureGen 2.0, a clean coal repowering program and carbon dioxide (CO2) storage

  5. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  6. EIS-0512: Alaska LNG Project, Alaska | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    2015. To comment on the scope of this EIS, use one of the following methods: * Provide oral or written comments at a public scoping meeting. * Submit text-only comments at...

  7. EIS-0509: Mississippi River LNG Project, Plaquemines Parish,...

    Broader source: Energy.gov (indexed) [DOE]

    23, 2014 EIS-0509: Notice of Intent to Prepare Environmental Impact Statement Contact James Ward james.ward@hq.doe.gov (202) 586-7092 More Information http:louisianalngenergy.com...

  8. EIS-0349: Cherry Point Co-generation Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to support BP West Coast Products, LLC proposal to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery.

  9. EIS-0508: Downeast LNG Import-Export Project, Washington County, Maine |

    Office of Environmental Management (EM)

    Department of Energy Availability of Draft Environmental Impact Statement EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and

  10. EIS-0440: Quartzsite Solar Energy Project, La Paz County, AZ

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western’s Bouse-Kofa 161-kilovolt transmission line. The proposal includes amending the Bureau of Land Management Resource Management Plan. Cooperating agencies in the preparation of this EIS are Bureau of Land Management (Yuma Field Office ), U.S. Army Corps of Engineers, U.S. Army Garrison (Yuma Proving Grounds), Arizona Game and Fish Department, and the Arizona Department of Environmental Quality.

  11. FutureGen Alliance Formally Seeking Proposals for CO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    25, 2010 For Immediate Release Contact: Lawrence Pacheco (202) 346-8855 lawrence.pacheco@fd.com FutureGen Alliance Formally Seeking Proposals for CO 2 Storage Site Springfield,...

  12. EIS-0460: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FutureGen 2.0 Project, Morgan County, Illinois This Mitigation Action Plan (MAP) briefly ... DOE prepared this MAP in accordance with 10 Code of Federal Regulations (CFR) 1021.331. ...

  13. Department of Energy and FutureGen Alliance Discuss Next Steps...

    Broader source: Energy.gov (indexed) [DOE]

    Officials from the Department of Energy, the state of Illinois, Ameren, Babcock & Wilcox, American Air Liquide and the FutureGen Alliance discussed the next steps for the FutureGen ...

  14. EIS-0361: Western Greenbrier Co-Production Demonstration Project, WV

    Broader source: Energy.gov [DOE]

    This EIS is about the potential environmental impacts of the U.S. Department of Energy’s (DOE’s) proposal to provide federal financial assistance for the construction and demonstration of a 98 megawatt (MWe) net power plant and cement manufacturing facility to be located in the municipality of Rainelle, Greenbrier County, West Virginia.

  15. EIS-0395: San Luis Rio Colorado Project, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to construct and operate a proposed transmission line originating at the proposed San Luis Rio Colorado (SLRC) Power Center in Sonora, Mexico, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company’s (APS) North Gila Substation

  16. EIS-0294: Sutter Power Project, Sutter County, California

    Broader source: Energy.gov [DOE]

    This EIS analyzes Western Area Power Administration's (Western) decision to support Calpine Corporation (Calpine) to construct an electric generating facility and associated 230-kilovolt (kV) transmission line, approximately 3.5 miles in length, known as the Sutter Power Plant (SPP).

  17. EIS-0213: Nez-Perce Tribal Hatchery Project (NPTH).

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration, the Bureau of Indian Affairs, and the Nez Perce Tribe propose to supplement their existing program to restore chinook salmon to the Clearwater River Subbasin in Idaho. This EIS evaluates the Proposed Action that the Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities.

  18. EIS-0297: Griffith Energy Project, Mohave County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) intends to prepare an environmental impact statement (EIS) regarding the proposal by Griffith Energy (GE), LLC, to construct an electric generating facility on private property and to interconnect this facility with Western’s system in the vicinity of Kingman, Arizona.

  19. EIS-0526: Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers and the Bureau of Reclamation are jointly preparing an EIS that analyzes the potential environmental impacts of the proposed Lower Yellowstone Intake Diversion Dam Fish Passage Project. The proposed project is to improve passage for endangered pallid sturgeon and other native fish at the Intake Diversion Dam in the lower Yellowstone River while continuing the operation of the Lower Yellowstone Irrigation Project. DOE’s Western Area Power Administration is a cooperating agency in preparing the EIS because some alternatives include power interconnection, transmission, and/or delivery options. Additional information is available at http://www.usbr.gov/gp/mtao/loweryellowstone/.

  20. EIS-0488: Cameron Liquefaction Project, Cameron Parish, Louisiana

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) prepared an EIS for a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export LNG. DOE, a cooperating agency, adopted the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. Additional information is available at http://energy.gov/fe/services/natural-gas-regulation.

  1. EIS-0464: Lake Charles Carbon Capture and Storage (CCS) Project in Calcasieu Parish, Louisiana

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of providing financial assistance for the construction and operation of a project proposed by Leucadia Energy, LLC. DOE selected this project for an award of financial assistance through a competitive process under the Industrial Carbon Capture and Sequestration Program.

  2. EIS-0516: Clean Path Energy Center Project; San Juan County, New Mexico

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing an EIS for the proposed interconnection of the Clean Path Energy Center Project to Western’s transmission system at the Shiprock Substation. The planned Clean Path Energy Center will consist of a 680 MW natural gas combined cycle power plant co-located with a 70 MW solar photovoltaic project.

  3. EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection with LVE's existing transmission system in northeastern Caribou County. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

  4. EIS-0413: Searchlight Wind Energy Project, Searchlight, NV

    Broader source: Energy.gov [DOE]

    The Department of the Interiors Bureau of Land Management, with DOEs Western Area Power Administration as a cooperating agency, is preparing this EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western.

  5. EIS-0140: Ocean State Power Project, Tennessee Gas Pipeline Company

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to evaluate potential impacts of construction and operation of a new natural gas-fired, combined-cycle power plant which would be located on a 40.6-acre parcel in the town of Burrillville, Rhode Island, as well as construction of a 10-mile pipeline to transport process and cooling water to the plant from the Blackstone River and a 7.5-mile pipeline to deliver No. 2 fuel oil to the site for emergency use when natural gas may not be available. The Economic Regulatory Administration adopted the EIS on 7/15/1988.

  6. EIS-0498: Magnolia LNG and Lake Charles Expansion Projects; Calcasieu Parish, Louisiana

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared an EIS that analyzes the potential environmental impacts of constructing and operating the proposed Magnolia LNG Project, an on-land liquefied natural gas (LNG) terminal and associated facilities near Lake Charles, Louisiana. The EIS also analyzes the potential environmental impacts of constructing and operating the proposed Lake Charles Expansion Project, which would reconfigure an existing pipeline system to serve the LNG terminal site. DOE was a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest.

  7. EIS-0450: TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada

    Broader source: Energy.gov [DOE]

    This EIS, prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the potential environmental impacts of granting a right-of-way for the TransWest Express Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

  8. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  9. EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona...

    Office of Environmental Management (EM)

    as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project...

  10. EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA

    Broader source: Energy.gov [DOE]

    This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

  11. EIS-0462: Crowned Ridge Wind Energy Center Project, Grant and Codington Counties, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve a grid interconnection request by NextEra Energy Resources for its proposed 150-megawatt (MW) Crowned Ridge Wind Energy Center Project with the Western Area Power Administration's existing Watertown Substation in Codington County, South Dakota.

  12. EIS-0136: Special Isotope Separation Project Idaho National Engineering Laboratory, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to provide environmental input to the decision to construct the Special Isotope Separation Project, which would allow for the processing of existing fuel-grade plutonium into weapons-grade plutonium using the Atomic Laser Isotope Separation process.

  13. EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the environmental impacts of interconnecting the proposed 150 megawatt Hyde County Wind Energy Center Project, in Hyde County, South Dakota, with DOE’s Western Area Power Administration’s existing Fort Thompson Substation in Buffalo County, South Dakota.

  14. EIS-0333: Maiden Wind Farm Project, Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA’s proposed action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer’s proposed Maiden Wind Farm.

  15. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  16. EIS-0444: Texas Clean Energy Project (TCEP), Ector County, Texas

    Broader source: Energy.gov [DOE]

    DOE has prepared a draft Supplement Analysis to the Texas Clean Energy Project due to changes made to the project after the issuance of the record of decision. See the draft SA for more detailed information on these changes.

  17. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  18. Mitigation of Vehicle Fast Charge Grid Impacts with Renewables and Energy

    Broader source: Energy.gov (indexed) [DOE]

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  19. Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  20. Sample data for greenbutton custodian project | OpenEI Community

    Open Energy Info (EERE)

    Sample data for greenbutton custodian project Home > Groups > Green Button Applications Hi Green Button experts, I pulled the data custodian code from https:github.comenergyos...

  1. EIS-0510: Calcasieu Pass Project, Cameron Parish, Louisiana ...

    Energy Savers [EERE]

    environmental impacts of the Calcasieu Pass Project, a proposed liquefied natural gas (LNG) export terminal in Cameron Parish, Louisiana. DOE is a cooperating agency in preparing...

  2. Final EIS for Champlain Hudson Power Express Transmission Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project CEQ Releases Two Handbooks on Improving Efficiency of Federal ...

  3. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  4. EIS-0512: Alaska LNG Project, Alaska | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The proposed Alaska LNG Project would include a gas treatment plant, more than 800 miles of natural gas pipeline, liquefaction and storage facilities, an LNG export (marine) ...

  5. EIS-0522: Melvin R. Sampson Hatchery, Yakima Basin Coho Project...

    Energy Savers [EERE]

    Sampson Hatchery, Yakima Basin Coho Project; Kittitas County, Washington Contact Dave Goodman jdgoodman@bpa.gov (503) 230-4764 More Information http:efw.bpa.gov...

  6. EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration EIS so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project (see DOE/EIS-0116-S1).

  7. EIS-0186: Proposed Healy Clean Coal Project, Healy, AK

    Office of Energy Efficiency and Renewable Energy (EERE)

    This environmental impact statement analyzes two proposed technologies. Under the Department of Energy's third solicitation of the Clean Coal Technology Program, the Alaska Industrial Development and Export Authority conceived, designed, and proposed the Healy Clean Coal Project. The project, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide, oxides of nitrogen, and particulate matter. DOE prepared this statement to analyze potential impacts of their potential support for this project.

  8. EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project

    Broader source: Energy.gov [DOE]

    This EIS assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides...

  9. EIS-0215: Pinon Pine Power Project, Tracy Station, NV

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) prepared this statement to assess the environmental and human health issues associated with the Pinon Pine Power Project, a proposed demonstration project that would be cost-shared by DOE and the Sierra Pacific Power Company (SPPCo.) under DOE's Clean Coal Technology Program. The proposed Federal action is for DOE to provide cost-shared funding support for the construction and operation of the Pinon Pine Power Project, a coal-fired power generating facility, which would be a nominal, 800-ton-per-day (104 megawatt (MW) gross generation) air-blown, Integrated Gasification Combined-Cycle plant proposed by SPPCo. at its Tracy Power Station near Reno, Nevada.

  10. EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona

    Broader source: Energy.gov [DOE]

    Hualapai Valley Solar, LLC, proposes to construct, operate and maintain a 340-megawatt, solar-powered generating facility in Mohave County, near Kingman, Ariz. The proposed project would use concentrating solar-power-trough technology to capture the sun's heat to make steam, which would power a traditional steam turbine generator.

  11. EIS-0201: Coyote Springs Cogeneration Project, Morrow County, Oregon

    Broader source: Energy.gov [DOE]

    This environmental impact statement analyzes the protential impacts of the Coyote Springs Cogeneration Project, a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a 22-acre site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440 average megawatts of energy when completed.

  12. EIS-0496: San Luis Transmission Project; Alameda, Merced, San Joaquin and Stanislaus Counties, California

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the San Luis & Delta-Mendota Water Authority (Authority) as joint federal and state lead agencies, are preparing an EIS/Environmental Impact Report that assesses the potential environmental impacts of the proposed San Luis Transmission Project. Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line between its Tracy and San Luis Substations and a new 70-kV transmission line between the San Luis and O'Neill Substations.

  13. EIS-0337: West Valley Demonstration Project Waste Management

    Broader source: Energy.gov [DOE]

    The purpose of the Final West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy’s proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities.

  14. DOE FutureGen Alliance Discuss Ne | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington, D. C. - Officials from the Department of Energy, the state of Illinois, Ameren, Babcock & Wilcox, American Air Liquide and the FutureGen Alliance discussed the next ...

  15. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    SciTech Connect (OSTI)

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  16. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) and the Sacramento Municipal Utility District (SMUD) are preparing a joint EIS/environmental impact report (EIR) –under, respectively, NEPA and the California Environmental Quality Act – that analyzes the potential environmental effects of the proposed new 500-kilovolt Colusa-Sutter (CoSu) Transmission Line Project. The proposed transmission line would interconnect the California-Oregon Transmission Project transmission system, near either Arbuckle or Maxwell, California, to the Central Valley Project transmission system near Yuba City, California. Western’s proposed action is to construct the CoSu Project and modify Western’s facilities to accommodate the new line; SMUD’s proposed action is to fund the proposal.

  17. EIS-0357- Gilberton Coal-to-Clean Fuels and Power Project in Giberton, PA

    Broader source: Energy.gov [DOE]

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action to provide cost-shared funding for construction and operation of facilities near Gilberton, Pennsylvania, which have been proposed by WMPI PTY, LLC, for producing electricity, steam, and liquid fuels from anthracite coal waste (culm). The project was selected by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate the integration of coal waste gasification and Fischer-Tropsch (F-T) synthesis of liquid hydrocarbon fuels at commercial scale.

  18. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  19. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  20. Final EIS Available

    Broader source: Energy.gov [DOE]

    DOE has published a Final Environmental Impact Statement (EIS) that considers all timely public comments on the Draft EIS and identifies DOE’s preferred project alternative(s). The U.S....

  1. EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

  2. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (FERC Project No. 460) September 17, 2010 EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: Final Environmental...

  3. EIS-0461: Notice of Cancellation of the Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Hyde County Wind energy Center Project EIS-0461-NotofCancel-2011.pdf More Documents & Publications EIS-0462: Notice of Cancellation of an Environmental Impact Statement EIS-0469:...

  4. EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project, Prince George's, Calvert, and Wicomico Counties, Maryland, and Sussex County, Delaware

    Broader source: Energy.gov [DOE]

    Pepco Holdings, Inc., cancelled its proposed Phase II of the Mid-Atlantic Power Pathway transmission line project and DOE cancelled preparation of an EIS on the potential environmental impacts of a proposed federal loan guarantee for the project.

  5. DOE Takes Next Steps with Restructured FutureGen Approach | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy with Restructured FutureGen Approach DOE Takes Next Steps with Restructured FutureGen Approach May 7, 2008 - 11:30am Addthis Announces Draft Solicitation for Multiple Commercial-Scale Clean Coal Plants with Sequestration WASHINGTON, DC - The U.S. Department of Energy (DOE) today released a draft Funding Opportunity Announcement (FOA) to solicit public input on the demonstration of multiple commercial-scale Integrated Gasification Combined Cycle (IGCC) or other clean coal power plants

  6. EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP)

    Broader source: Energy.gov [DOE]

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National...

  7. EIS-0183: Shepherds Flat Wind Project in Gilliam and Morrow counties...

    Office of Environmental Management (EM)

    Documents Available for Download October 19, 2010 EIS-0183: Revised Record of Decision Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of,...

  8. EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana

    Broader source: Energy.gov [DOE]

    This EIS has been cancelled. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/M2W/.

  9. EIS-0202: Umatilla Basin Project Planning Report and Final Environmental Report

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposed support for the Bureau of Reclamation proposal to assist in restoration of the Umatilla River anadromous fishery.

  10. EIS-0282: McIntosh Unit 4 TCFB Demonstration Project, Clean Coal Technology Program, Lakeland, Florida (also see EIS-0304)

    Broader source: Energy.gov [DOE]

    The proposed project, selected under DOE’s Clean Coal Technology Program, would demonstrate both Pressurized Circulating Fluidized Bed (PCFB) and Topped PCFB technologies. The proposed project would involve the construction and operation of a nominal 238 MWe (megawatts of electric power) combined-cycle power plant designed to burn a range of low- to high-sulfur coals.

  11. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 22, 2006 EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project August 1, 2006 EIS-0383: Draft Environmental Impact Statement...

  12. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 2003 EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management April 1, 2003 EIS-0312: Final Environmental Impact Statement Fish...

  13. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 1, 2012 EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR February 8, 2012 EIS-0476: Final Environmental Impact...

  14. EIS-0419: Supplement Analysis | Department of Energy

    Office of Environmental Management (EM)

    For more information, see the project page: http:energy.govnode300313. PDF icon EIS-0419-SA-2015 More Documents & Publications EIS-0419: Record of Decision EIS-0419: Final ...

  15. EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound

    Broader source: Energy.gov [DOE]

    The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior’s 2009 Final Cape Wind Energy Project EIS, in combination with two Cape Wind Environmental Assessments dated May 2010 and April 2011 (per 40 CFR 1506.4), as a DOE Final EIS (DOE/EIS-0470). The adequacy of the Department of the Interior final EIS adopted by DOE is the subject of a judicial action. This project is inactive.

  16. FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Vermeul, Vince R.; Strickland, Chris E.; Thorne, Paul D.; Bjornstad, Bruce N.; Mackley, Rob D.; Kelly, Mark E.; Sullivan, Charlotte; Williams, Mark D.; Amonette, James E.; Downs, Janelle L.; et al

    2014-12-31

    The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoringmore » strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.« less

  17. FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

    SciTech Connect (OSTI)

    Vermeul, Vince R.; Strickland, Chris E.; Thorne, Paul D.; Bjornstad, Bruce N.; Mackley, Rob D.; Kelly, Mark E.; Sullivan, Charlotte; Williams, Mark D.; Amonette, James E.; Downs, Janelle L.; Fritz, Brad G.; Szecsody, Jim E.; Bonneville, Alain; Gilmore, Tyler J.

    2014-12-31

    The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoring strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.

  18. EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal by BPA to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, OR.

  19. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  20. FutureGen Project Launched | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    said, as he praised them for their initiative. "The prototype plant will be a stepping-stone toward future coal-fired power plants that not only will produce hydrogen and ...

  1. EIS Distribution

    Broader source: Energy.gov [DOE]

    This DOE guidance presents a series of recommendations related to the EIS distribution process, which includes creating and updating a distribution list, distributing an EIS, and filing an EIS with the EPA.

  2. EIS-0288: Consolidated Record of Decision (EIS-0270 & EIS-0271...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tritium Supply and Recycling (EIS-0288) (EIS-0270) (EIS-0271) Consolidated Record of Decision for Tritium Supply and Recycling (EIS-0288) (EIS-0270) (EIS-0271) (May 1999) (115.34 ...

  3. EIS-0300: Minnesota Agri-Power Project: Biomass for Rural Development, Granite Falls, Minnesota

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE and the Minnesota Environmental Quality Boards' [MEQB, a Minnesota State agency] decision to support a proposal by the Minnesota Valley Alfalfa Producers (MnVAP) to construct and operate a 75–103 megawatt biomass fueled gasifier and electric generating facility, known as the Minnesota Agri-Power Plant (MAPP), and associated transmission lines and alfalfa processing facilities.

  4. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  5. Final EIS for Champlain Hudson Power Express Transmission Project Now Available

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has prepared a Final Environmental Impact Statement (EIS) to evaluate the potential environmental impacts in the United States of the proposed action to issue a Presidential permit to the Applicant, Champlain Hudson Power Express, Inc. (CHPEI), and the range of reasonable alternatives.

  6. EIS-0267: BPA/Lower Valley Transmission System Reinforcement Project, Wyoming

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA and LVPL proposal to construct a new 115-kV line from BPA’s Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA’s Teton Substation near Jackson in Teton County, Wyoming.

  7. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  8. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon.

  9. EIS-0494: Excelerate Liquefaction Solutions Lavaca Bay LNG Project, Calhoun and Jackson Counties, Texas

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal consisting of two floating liquefaction, storage and offloading units and a 29-mile pipeline header system to transport natural gas from existing pipeline systems to the LNG terminal facilities.

  10. EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposed action to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

  11. EIS-0487: Notice of EIS Adoption | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of EIS Adoption EIS-0487: Notice of EIS Adoption Freeport LNG Liquefaction Project, Brazoria County, Texas The Environmental Protection Agency issued a notice of DOE adoption of an EIS that the Federal Energy Regulatory Commission prepared, with DOE as a cooperating agency, on a proposal to expand an existing liquefied natural gas (LNG) import terminal and associated facilities in Brazoria County, Texas, to enable the terminal to liquefy and export LNG.

  12. FutureGen-2-0-NEPA-EIS-ROD-Final-1-15-14.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  13. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  14. EIS-0493: Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) prepared, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas; a marine berth connecting the terminal to the adjacent La Quinta Channel; and an approximately 23-mile-long natural gas transmission pipeline and associated facilities.

  15. SmartGrid: Quarterly Data Summaries from the Data Hub and SmartGrid Project Information (from OpenEI and SmartGrid.gov)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Both OpenEI and SmartGrid.gov are DOE portals to a wealth of information about the federal initiatives that support the development of the technologies, policies and projects transforming the electric power industry. Projects funded through the U.S. Recovery Act are organized by type and pinned to an interactive map at http://en.openei.org/wiki/Gateway:Smart_Grid. Each project title links to more detailed information. The Quarterly Data Summaries from the Data Hub at SmartGrid.gov are also available on OpenEI at http://en.openei.org/datasets/node/928. In addition, the SmartGrid Information Center contains documents and reports that can be searched or browsed. Smart Grid Resources introduces international SmartGrid programs and sites, while OpenEI encourages users to add SmartGrid information to the repository.

  16. EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG’s proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson County, Texas, for use in enhanced oil recovery operations; and demonstrate monitoring techniques to verify the permanence of geologic CO2 storage.

  17. EIS-0492: Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA)

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of proposals (1) to add liquefaction and export capability to a proposed liquefied natural gas (LNG) import terminal in Warrenton, Oregon, and add 39 miles of new pipeline in Columbia County, Oregon, and Cowlitz County, Washington, to interconnect with the Northwest Pipeline, and (2) to expand the capacity of the Northwest Pipeline by adding 140 miles of 36-inch diameter pipeline in 10 segments and increasing compression at five existing compressor stations. These proposals are connected actions and will be evaluated in the same EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest.

  18. EIS-0505: Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  19. EIS-0505: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  20. EIS-0522: Melvin R. Sampson Hatchery, Yakima Basin Coho Project; Kittitas County, Washington

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) is preparing an EIS that analyzes the potential environmental impacts of constructing and operating a proposed hatchery for coho salmon. BPA’s proposed action is to fund the Confederated Tribes of the Yakama Nation construction of a hatchery on 50 acres of land owned by the Yakama Nation in Kittitas County, Washington. Hatchery operations would include collection of adult coho for broodstock at the existing Roza and Sunnyside dams, incubation and rearing of up to 200,000 juvenile coho salmon, and release of smolts into the Yakima and Naches Rivers.

  1. EIS-0489: Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR)

    Broader source: Energy.gov [DOE]

    Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, prepared an EIS to analyze the potential environmental impacts of a proposal to construct and operate the Jordan Cove Liquefaction and Pacific Connector Pipeline Projects, respectively a proposed new liquefied natural gas (LNG) export terminal and associated facilities in Coos County, Oregon, and a natural gas pipeline between the Malin Hub in Klamath County, Oregon, and the Jordan Cove terminal. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest.

  2. EIS-0463: Notice of Public Hearings | Department of Energy

    Energy Savers [EERE]

    Hearings EIS-0463: Notice of Public Hearings Northern Pass Transmission Line Project, New Hampshire DOE announces public hearings to receive comments on the Draft EIS. The Draft ...

  3. EIS-0415: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    South Dakota For more information, see the project page: http:energy.govnode302023. EIS-0415-DEIS-2010.pdf More Documents & Publications EIS-0478: Final Environmental Impact...

  4. EIS-0427: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of...

  5. EIS-0072: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF ...

  6. EIS-0143: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & ...

  7. EIS-0450: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being ...

  8. EIS-0370: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental ...

  9. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  10. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...