San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

2

Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This report documents scenarios and technologies that can be applied in the future for the inspection of transmission lines. Scenarios describe the utilization of a range of concepts, including distributed sensors, unmanned airborne vehicles, RF communication, and robotics. An approach to performing demonstration projects using currently available technologies is provided and will be implemented in the following phases of the project.

2008-06-23T23:59:59.000Z

3

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

4

HVDC transmission: a path to the future?  

Science Conference Proceedings (OSTI)

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

5

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

6

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

7

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

a whollyowned subsidiary of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing...

8

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

9

Great Plains Wind Energy Transmission Development Project  

DOE Green Energy (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

10

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

11

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

12

EA-1960: Townsite Solar Project Transmission Line, Clark County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management,...

13

EA-1896: Williston to Stateline Transmission Line Project, Mountrail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project,...

14

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

15

Emerging and Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This technical update report describes research by the Electric Power Research Institute (EPRI) into emerging and future overhead electric transmission line inspection and assessment technologies. In 2008, EPRI published a report entitled Future Inspection of Overhead Transmission Lines (product 1016921) that documented scenarios and viable technologies that could be applied for the inspection of transmission lines over a multi-decade timeframe. That document was intended to provide a roadmap for near- a...

2011-12-22T23:59:59.000Z

16

New transmission project will help California meet summer ...  

U.S. Energy Information Administration (EIA)

The project also interconnected with the control area of Southern California Edison's Edison International transmission system.

17

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

18

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

19

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

20

Future Inspection and Monitoring of Underground Transmission Lines  

Science Conference Proceedings (OSTI)

Underground transmission lines have performed reliably for the power transmission industry. Nonetheless, there are opportunities to improve on-line condition assessment of the underground cable systems. Some of these opportunities can be realized by incorporating improved sensors, more efficient power sources to the sensors, enhanced data collection systems, and better integration with utilities operations systems. This report describes technologies that can be applied in future inspection and monitoring...

2009-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

22

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

23

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

24

EIS-0231: Navajo Transmission Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

25

The Electricity Transmission System Future Vision & Grid Challenges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Future Vision & Grid Challenges Future Vision & Grid Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 1, 2012 Breakout Group Discussion Overview Future Vision and Grid Challenges Each of the four breakout groups identified the key challenges facing the grid as it integrates all of the various technologies that are (or will be) deployed while ensuring a safe, reliable, and cost-effective system as described in the Future Vision. Utilizing the Grid Tech Team framework, each group identified integration challenges through a systems-based discussion that addressed all of the following topics: * Grid Visibility What challenges in the informational domain (sensors and relays, AMIs, PMUs, end-use energy

26

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

27

Design of resource to backbone transmission for a high wind penetration future.  

E-Print Network (OSTI)

??In a high wind penetration future, transmission must be designed to integrate groups of new wind farms with a high capacity inter-regional ``backbone" transmission system.… (more)

Slegers, James Michael

2013-01-01T23:59:59.000Z

28

EIS-0474: Southline Transmission Project, Arizona and New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of the proposed Southline Transmission Project, which would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations.

29

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

30

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

31

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

32

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

33

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2...

34

Northern Pass Transmission Line Project Environmental Impact Statement:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

35

New Approaches to Managing Transmission Project Risk  

Science Conference Proceedings (OSTI)

This report discusses the growing risks associated with transmission development and the importance of managing or hedging these risks. It presents case studies to illustrate the risks and categorizes approaches to managing them. It describes two EPRI tools that may be useful in managing transmission development risks, suggests how these tools might be further developed, and identifies other useful areas of research.

2006-11-15T23:59:59.000Z

36

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Antelope Valley Station to Neset Transmission Project, 8: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND SUMMARY USDA Rural Utilities Service is preparing this EIS to evaluate the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western's transmission system. PUBLIC COMMENT OPPORTUNITIES No Public Comment Opportunities at this time

37

NETL: News Release - FutureGen Project Launched  

NLE Websites -- All DOE Office Websites (Extended Search)

2005 FutureGen Project Launched Government, Industry Agree to Build Zero-Emissions Power Plant of the Future WASHINGTON, DC - Secretary of Energy Samuel Bodman today announced...

38

NETL: Turbine Projects - Carbon Management (FutureGen)  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Management (FutureGen) Turbine Projects Carbon Management (FutureGen) Hydrogen Turbines new solicitation in FY05 DataFact Sheets...

39

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

40

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

NLE Websites -- All DOE Office Websites (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

staff at Southern California Edison and  Bonneville Power by Southern California Edison for this project.   Similar that Southern California Edison is initiating such tests 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

42

Subject: SPPR Proposed ED5 to Palo Verde Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Date: 832010 4:04 PM Subject: SPPR Proposed ED5 to Palo Verde Transmission Project VIA ELECTRONIC MAIL TO: DSWFPP@wapa.gov August 3, 2010 Mr. Darrick Moe...

43

Subject: SPPR Proposed ED5 to Palo Verde Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Date: 832010 4:02 PM Subject: SPPR Proposed ED5 to Palo Verde Transmission Project VIA ELECTRONIC MAIL TO: DSWFPP@wapa.gov August 3, 2010 Mr. Darrick Moe...

44

Request for Proposals for New or Upgraded Transmission Line Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012...

45

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

46

Midwest Independent Transmission System Operator Smart Grid Project | Open  

Open Energy Info (EERE)

Operator Smart Grid Project Operator Smart Grid Project Jump to: navigation, search Project Lead Midwest Independent Transmission System Operator Country United States Headquarters Location Carmel, Indiana Additional Benefit Places Iowa, Illinois, Michigan, Minnesota, Missouri, Montana, North Dakota, Ohio, Pennsylvania, South Dakota, Wisconsin Recovery Act Funding $17,271,738.00 Total Project Value $34,543,476.00 Coverage Area Coverage Map: Midwest Independent Transmission System Operator Smart Grid Project Coordinates 39.978371°, -86.1180435° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

47

Southwest Transmission Cooperative, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Inc. Smart Grid Project Inc. Smart Grid Project Jump to: navigation, search Project Lead Southwest Transmission Cooperative, Inc. Country United States Headquarters Location Benson, Arizona Recovery Act Funding $32,244,485.00 Total Project Value $64,488,970.00 Coverage Area Coverage Map: Southwest Transmission Cooperative, Inc. Smart Grid Project Coordinates 31.9678611°, -110.2945174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

48

American Transmission Company LLC II Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $11,444,180 Total Project Value $22,888,360 Coverage Area Coverage Map: American Transmission Company LLC II Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

49

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

50

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

51

American Transmission Company LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

American Transmission Company LLC American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $1,330,825.00 Total Project Value $2,661,650.00 Coverage Area Coverage Map: American Transmission Company LLC Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

52

FutureGen Project Launched | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FutureGen Project Launched FutureGen Project Launched FutureGen Project Launched December 6, 2005 - 4:29pm Addthis Government, Industry Agree to Build Zero-Emissions Power Plant of the Future WASHINGTON, DC -- Secretary of Energy Samuel W. Bodman today announced that the Department of Energy has signed an agreement with the FutureGen Industrial Alliance to build FutureGen, a prototype of the fossil-fueled power plant of the future. The nearly $1 billion government-industry project will produce electricity and hydrogen with zero-emissions, including carbon dioxide, a greenhouse gas. The initiative is a response to President Bush's directive to develop a hydrogen economy by drawing upon the best scientific research to address the issue of global climate change. Today's announcement marks the official

53

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

54

Transmission Asset Optimization (and) A Contrarian View of the Future of  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Asset Optimization (and) A Contrarian View of the Future of Transmission Asset Optimization (and) A Contrarian View of the Future of Distributed Generation vs. Central Station Generation Speaker(s): Dale Bradshaw Date: June 5, 2000 - 10:00am Location: 90-3148 Seminar Host/Point of Contact: David Faulkner This was a two part seminar: Part One: Transmission Asset Optimization Presentation of latest technology developments that can increase the flow of power over todays transmission lines, thus potentially reducing total costs for transmitting power, while improving transmission reliability. Technologies discussed include FACTs devices, energy storage, etc.) Part Two: A Contrarian View of the Future of Distributed Generation vs. Central Station Generation: There have been a lot claims and hype concerning the relative competitive position in the future of distributed generation (DG)

55

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

56

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Summary Summary * The Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the BPA/Lower Valley Transmission Project by Bonneville Power Administration (BPA). BPA is the lead federal agency on this project and supervises the preparation of the EIS. The U.S. Forest Service is a cooperating agency and assists BPA in EIS preparation. The Targhee and Bridger-Teton National Forests are crossed by BPA's existing transmission line and some of the alternatives. S.1 Purpose and Need For Action S.1.1 BPA Lower Valley Power and Light, Inc. (LVPL) buys electricity from BPA and then supplies it to the residences, farms and businesses of the Jackson and Afton, Wyoming areas. Since the late 1980s,

57

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

58

Power System Transmission Protection: Proposed R&D Projects  

Science Conference Proceedings (OSTI)

The U.S.-Canada task force on the August 14, 2003 power system outage that affected 50 million people concluded that inappropriate and uncoordinated relay protection settings were one of the three principal reasons that the cascade outage spread beyond Ohio and caused the widespread blackout. Based on input from utilities and other stakeholders at a recent protection workshop, this report proposes four R&D project to help meet needs in the transmission protection area.

2005-09-14T23:59:59.000Z

59

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

60

The Future of Offshore Wind Energy and Transmission in New Jersey...  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2013, 4:15pm to 5:30pm Colloquia MBG Auditorium The Future of Offshore Wind Energy and Transmission in New Jersey Kris Ohleth The Atlantic Wind Connection Offshore wind is the...

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Evaluating Uncertainties in the Projection of Future Drought  

Science Conference Proceedings (OSTI)

The uncertainty in the projection of future drought occurrence was explored for four different drought indices using two model ensembles. The first ensemble expresses uncertainty in the parameter space of the third Hadley Centre climate model, ...

Eleanor J. Burke; Simon J. Brown

2008-04-01T23:59:59.000Z

62

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

63

Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility  

Science Conference Proceedings (OSTI)

The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction.

Queen, R.L.

1991-06-01T23:59:59.000Z

64

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

65

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

66

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

67

Oak Ridge Project Opens Possibilities for Future Mission Work, Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Opens Possibilities for Future Mission Work, Project Opens Possibilities for Future Mission Work, Development Oak Ridge Project Opens Possibilities for Future Mission Work, Development April 29, 2013 - 12:00pm Addthis Environmental sampling helps identify which reservation locations are not contaminated. Environmental sampling helps identify which reservation locations are not contaminated. OAK RIDGE, Tenn. - EM is refining the picture of uncontaminated areas within the 33,500-acre Oak Ridge Reservation through a review of historic documents and extensive sampling, analysis and characterization. The EM program has verified thousands of acres are not contaminated, or otherwise meet existing regulatory standards, and therefore do not require cleanup, creating possibilities for future mission work and economic development.

68

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Project” Presented at Transmission Line Siting Models.last major interregional transmission line to California wasowner. It has built transmission lines across California to

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

69

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

70

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 9 9 7 1 9 9 7 B PA / L O W E R VA L L E Y T R A N S M I S S I O N P R O J E C T Final Environmental Impact Statement DOE/EIS-0267 J U N E 1 9 9 8 Bonneville Power Administration PO Box 3621 Portland, Oregon 97208-3621 DOE/BP-3067 JUNE 1998 450 Final Environmental Impact Statement BPA/Lower Valley Transmission Project Bonneville Power Administration U.S. Department of Energy and Forest Service U.S. Department of Agriculture June 1998 Table of Contents - i Table of Contents Summary ............................................................................................................................ S-1 S.1 Purpose and Need For Action ................................................................................................ S-1 S.1.1 BPA ...............................................................................................................................................

71

Sierra Pacific Power Company Alturas Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transmission line to withstand expected maximum fault displacement. . ES-49 KesidualI*acf '.:, , ,,.,, .. .... ...... .. . ... . .. . .. .. . . . .. ,,. ,::.,. ,.,,, ,..,, lot...

72

Transportation Energy Futures: Project Overview and Findings (Presentation)  

SciTech Connect

The U.S. Department of Energy-sponsored Transportation Energy Futures (TEF) project examines how combining multiple strategies could reduce both GHG emissions and petroleum use by 80%. The project's primary objective was to help inform domestic decisions about transportation energy strategies, priorities, and investments, with an emphasis on previously underexplored opportunities related to energy efficiency and renewable energy in light-duty vehicles, non-light-duty vehicles, fuels, and transportation demand. This PowerPoint provides an overview of the project and its findings.

Not Available

2013-03-01T23:59:59.000Z

73

California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning  

Science Conference Proceedings (OSTI)

The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

Eto, Joseph; Stovall, John P.

2003-04-01T23:59:59.000Z

74

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

75

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

76

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

77

Event:CCCCC and SPREP-Future Climate Change Projects | Open Energy...  

Open Energy Info (EERE)

Projects Jump to: navigation, search Calendar.png CCCCC and SPREP-Future Climate Change Projects: 1:30pm- on 20111201 CCCCC and SPREP-Future Climate Change Projects Event Details...

78

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

79

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

80

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Energy.gov (U.S. Department of Energy (DOE))

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

82

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

83

DOE/EA-1644: Kildeer to Mountain Transmission Project Pre-Decisional Environmental Assessment (May 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KILLDEER TO MOUNTAIN KILLDEER TO MOUNTAIN TRANSMISSION PROJECT PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT MAY 5, 2009 DOE/EA-1644 PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT KILLDEER TO MOUNTAIN PAGE i MAY 2009 TRANSMISSION PROJECT DOE/EA -1644 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................. 1-1 1.1 Purpose of and Need for Action ........................................................................................... 1-1 1.1.1 Project Purpose ............................................................................................................ 1-1 1.1.2 Western's Purpose and Need ..................................................................................... 1-1

84

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

85

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and  

NLE Websites -- All DOE Office Websites (Extended Search)

96: San Luis Transmission Project, Alameda, Merced, San 96: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California Summary DOE's Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. Western proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a

86

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

87

EIS-0496: San Luis Transmission Project, Alameda, Merced, San...  

NLE Websites -- All DOE Office Websites (Extended Search)

proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and...

88

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

DOE Green Energy (OSTI)

This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

Woodford, D.

2011-02-01T23:59:59.000Z

89

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

DOE Green Energy (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

90

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

91

Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Port Angeles-Juan de Fuca Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS-0378 October 2007 Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS - 0378 D e p a r t m e n t o f E n e r g y Office of Electricity Delivery and Energy Reliability and Bonneville Power Administration October 2007 Port Angeles-Juan de Fuca Transmission Project DOE/EIS-0378 Responsible Agency: U.S. Department of Energy (DOE): Office of Electricity Delivery and Energy Reliability (OE) and Bonneville Power Administration (BPA) Title of Proposed Project: Port Angeles-Juan de Fuca Transmission Project State Affected: Washington (WA) Abstract: Sea Breeze Olympic Converter LP (Sea Breeze) has applied to DOE for authorizations and approvals

92

Projected Future Carbon Storage and Greenhouse-Gas Fluxes of Terrestrial  

E-Print Network (OSTI)

Projected Future Carbon Storage and Greenhouse-Gas Fluxes of Terrestrial Ecosystems in the Western. Sleeter Chapter 9 of Baseline and Projected Future Carbon Storage and Greenhouse-Gas Fluxes in Ecosystems.L., Hawbaker, T.J., and Sleeter, B.M., 2012, Projected future carbon storage and greenhouse gas fluxes

Fleskes, Joe

93

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

94

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

95

Final Environmental Impact Statement for the FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Chapters 1-3, 8-12 Appendices NOVEMBER 2007 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for FutureGen Project (DOE/EIS-0394) Location: Mattoon, Illinois; Tuscola, Illinois; Jewett, Texas; and Odessa, Texas Contact: For further information about this Environmental Impact Statement, contact: For general information on the U.S. Department of Energy's process for implementing the National Environmental Policy Act, contact: Mark McKoy, Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 (304) 285-4426 or fax (304) 285-4403 Carol Borgstrom, Director

96

Final Environmental Impact Statement for the FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary NOVEMBER 2007 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for FutureGen Project (DOE/EIS-0394) Location: Mattoon, Illinois; Tuscola, Illinois; Jewett, Texas; and Odessa, Texas Contact: For further information about this Environmental Impact Statement, contact: For general information on the U.S. Department of Energy's process for implementing the National Environmental Policy Act, contact: Mark McKoy, Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 (304) 285-4426 or fax (304) 285-4403 Carol Borgstrom, Director

97

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

98

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

99

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

100

Influence of model biases on projected future changes in tropical cyclone frequency of occurrence  

Science Conference Proceedings (OSTI)

The influence of model biases on projected future changes in the frequency of occurrence of tropical cyclones (FOCs) was investigated using a new empirical statistical method. Assessments were made of present-day (1979–2003) simulations and future ...

Hiroyuki Murakami; Pang-Chi Hsu; Osamu Arakawa; Tim Li

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

102

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

103

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

104

Cold tongue and warm pool ENSO events in CMIP5: mean state and future projections  

Science Conference Proceedings (OSTI)

The representation of the El Niño-Southern Oscillation (ENSO) under historical forcing and future projections is analyzed in 34 Coupled Model Intercomparison Project Phase 5 (CMIP5) models. Most models realistically simulate the observed intensity ...

Andréa S. Taschetto; Alexander Sen Gupta; Nicolas C. Jourdain; Agus Santoso; Caroline C. Ummenhofer; Matthew H. England

105

Future Changes in the South Asian Summer Monsoon: An Analysis of the CMIP3 Multimodel Projections  

Science Conference Proceedings (OSTI)

The projected future behavior of the South Asian summer monsoon (SASM) is analyzed for the 720-ppm stabilization experiments [Special Report on Emissions Scenarios (SRES) A1B] of phase 3 of the Coupled Model Intercomparison Project (CMIP3) ...

Fangxing Fan; Michael E. Mann; Sukyoung Lee; Jenni L. Evans

2012-06-01T23:59:59.000Z

106

Attribution of Projected Future Changes in Tropical Cyclone Passage Frequency over the Western North Pacific  

Science Conference Proceedings (OSTI)

This paper performs an attribution analysis of future changes in the frequency of tropical cyclone (TC) passages over the western North Pacific basin projected by seven general circulation models. The models project increases in the passage ...

Satoru Yokoi; Yukari N. Takayabu; Hiroyuki Murakami

2013-06-01T23:59:59.000Z

107

Secretary Chu Announces Agreement on FutureGen Project in Mattoon, Illinois  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agreement on FutureGen Project in Mattoon, Agreement on FutureGen Project in Mattoon, Illinois Secretary Chu Announces Agreement on FutureGen Project in Mattoon, Illinois June 12, 2009 - 1:00pm Addthis Washington, DC - U.S. Secretary of Energy Steven Chu today announced an agreement with the FutureGen Alliance that advances the construction of the first commercial scale, fully integrated, carbon capture and sequestration project in the country in Mattoon, Illinois. "This important step forward for FutureGen reflects this Administration's commitment to rapidly developing carbon capture and sequestration technology as part of a comprehensive plan to create jobs, develop clean energy and reduce climate change pollution." said Energy Secretary Steven Chu. "The FutureGen project holds great promise as a flagship facility to

108

Secretary Chu Announces Agreement on FutureGen Project in Mattoon, IL |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agreement on FutureGen Project in Mattoon, Agreement on FutureGen Project in Mattoon, IL Secretary Chu Announces Agreement on FutureGen Project in Mattoon, IL June 12, 2009 - 12:00am Addthis Washington, D.C. - U.S. Secretary of Energy Steven Chu today announced an agreement with the FutureGen Alliance that advances the construction of the first commercial scale, fully integrated, carbon capture and sequestration project in the country in Mattoon, Illinois. "This important step forward for FutureGen reflects this Administration's commitment to rapidly developing carbon capture and sequestration technology as part of a comprehensive plan to create jobs, develop clean energy and reduce climate change pollution." said Energy Secretary Steven Chu. "The FutureGen project holds great promise as a flagship facility to

109

U.S. and India Sign Historic Agreement on FutureGen Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sign Historic Agreement on FutureGen Project Sign Historic Agreement on FutureGen Project U.S. and India Sign Historic Agreement on FutureGen Project April 3, 2006 - 10:02am Addthis India to Participate in World's First Integrated CO2 Sequestration and Hydrogen Production Research Power Plant, FutureGen Initiative NEW DELHI, INDIA - The U.S. Department of Energy (DOE) announced the signing of an agreement with India that makes it the first country to join the U.S. on the government steering committee for the FutureGen Initiative. FutureGen is an initiative to build and operate the world's first coal-based power plant that removes and sequesters carbon dioxide (CO2) while producing electricity and hydrogen. "Adding India to our list of partners is an exciting step for the FutureGen project," Secretary of Energy Samuel W. Bodman said. "The success of

110

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

111

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

112

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

113

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

114

EIS-0460: FutureGen 2.0 Project, Morgan County, Illinois | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: FutureGen 2.0 Project, Morgan County, Illinois 60: FutureGen 2.0 Project, Morgan County, Illinois EIS-0460: FutureGen 2.0 Project, Morgan County, Illinois Summary This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 project. Under the FutureGen 2.0 project, DOE would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. Public Comment Opportunities None available at this time. Documents Available for Download January 15, 2014 EIS-0460: Record of Decision

115

Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase February 4, 2013 - 7:25pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Following the successful completion of the first phase, the Energy Department today announced the beginning of Phase II of project development with a new cooperative agreement between the FutureGen Industrial Alliance and the Department of Energy for an innovative carbon capture and storage (CCS) project in Illinois. "The Department of Energy is committed to the demonstration of carbon capture and storage technologies. We believe FutureGen 2.0 is an important step in making economic, commercial scale CCS a reality," said U.S.

116

U.S. and India Reach Historic Agreement on FutureGen Project | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reach Historic Agreement on FutureGen Project Reach Historic Agreement on FutureGen Project U.S. and India Reach Historic Agreement on FutureGen Project March 2, 2006 - 11:34am Addthis India becomes the first nation to accept U.S. invitation to participate in new clean coal project WASHINGTON, DC - President George W. Bush announced today that India will become the first country to participate on the government steering committee for the U.S. Department of Energy's FutureGen project - an initiative to build and operate the world's first coal-based power plant that removes and sequesters carbon dioxide (CO2) while it produces electricity and hydrogen. As a partner, the Indian government will contribute $10 million to the FutureGen Initiative and Indian companies will also be invited to participate in the private sector segment.

117

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

118

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

119

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

120

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

122

Draft Environmental Impact Statement for FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0394D FUTUREGEN PROJECT EIS DOE/EIS-0394D FUTUREGEN PROJECT EIS DRAFT TABLE OF CONTENTS MAY 2007 i TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................ i LIST OF ACRONYMS ................................................................................... LIST OF ACRONYMS - 1 VOLUME I 1. PURPOSE AND NEED FOR AGENCY ACTION ......................................................................1-1 1.1 INTRODUCTION......................................................................................................................1-1 1.2 PROPOSED ACTION ...............................................................................................................1-1 1.3 PURPOSE AND NEED FOR AGENCY ACTION...................................................................1-2

123

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

124

Draft Environmental Impact Statement for FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAY 2007 i MAY 2007 i SUMMARY TABLE OF CONTENTS TABLE OF CONTENTS............................................................................................................................... i LIST OF ACRONYMS ................................................................................................................................ v SUMMARY.............................................................................................................................................. S-1 S.1 OVERVIEW ............................................................................................................................. S-1 S.1.1 Basis for U.S. Department of Energy Action.................................................................... S-1 S.1.2 Relationship between the U.S. Department of Energy and the FutureGen Alliance

125

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

126

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

127

Present status and future development of Qinshan Nuclear Power Project  

Science Conference Proceedings (OSTI)

Qinshan 300 MWe Nuclear Power Project is the first domestically designed and constructed nuclear power plant in China. Given is a brief description of its progress in design work, equipment manufacture and site construction since the first structural concrete in March 1985. In Qinshan area four units of 600 MWe each are planned to be built with collaboration of proper foreign partners.

Yu, O.

1988-01-01T23:59:59.000Z

128

Port Angeles-Juan de Fuca Transmission Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This summary includes information regarding the following elements of the draft environmental impact statement (EIS) prepared for the Port Angeles-Juan de Fuca Transmission Project: * purpose and need for action; * Proposed Action and No Action Alternative; and * affected environment, environmental impacts, and mitigation measures. S.1 Purpose and Need for Action Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to

129

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

130

Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.  

DOE Green Energy (OSTI)

Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

Not Available

1985-01-01T23:59:59.000Z

131

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

132

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

133

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Draft environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (ac) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. These adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

134

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Final environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (AC) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. The adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

135

Record of Decision Issued for the FutureGen 2.0 Project | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

with construction and operation of the FutureGen 2.0 Project, which is a public-private partnership formed for the purpose of developing the world's first...

136

Evaluating the Uncertainty Induced by the Virtual Salt Flux Assumption in Climate Simulations and Future Projections  

Science Conference Proceedings (OSTI)

The unphysical virtual salt flux (VSF) formulation widely used in the ocean component of climate models has the potential to cause systematic and significant biases in modeling the climate system and projecting its future evolution. Here a ...

Jianjun Yin; Ronald J. Stouffer; Michael J. Spelman; Stephen M. Griffies

2010-01-01T23:59:59.000Z

137

Projected Future Changes in Vegetation in Western North America in the Twenty-First Century  

Science Conference Proceedings (OSTI)

Rapid and broad-scale forest mortality associated with recent droughts, rising temperature, and insect outbreaks has been observed over western North America (NA). Climate models project additional future warming and increasing drought and water ...

Xiaoyan Jiang; Sara A. Rauscher; Todd D. Ringler; David M. Lawrence; A. Park Williams; Craig D. Allen; Allison L. Steiner; D. Michael Cai; Nate G. McDowell

2013-06-01T23:59:59.000Z

138

Future Projections of Landfast Ice Thickness and Duration in the Canadian Arctic  

Science Conference Proceedings (OSTI)

Projections of future landfast ice thickness and duration were generated for nine sites in the Canadian Arctic and one site on the Labrador coast with a simple downscaling technique that used a one-dimensional sea ice model driven by ...

J. A. Dumas; G. M. Flato; R. D. Brown

2006-10-01T23:59:59.000Z

139

The Fermilab ISDN Pilot Project: Experiences and future plans  

SciTech Connect

Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

Martin, D.E.; Lego, A.J.; Clifford, A.E.

1995-12-31T23:59:59.000Z

140

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

DOE Green Energy (OSTI)

The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

2012-06-01T23:59:59.000Z

142

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

143

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

144

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

145

U.S. and South Korea Sign Agreement on FutureGen Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Korea Sign Agreement on FutureGen Project South Korea Sign Agreement on FutureGen Project U.S. and South Korea Sign Agreement on FutureGen Project June 26, 2006 - 2:34pm Addthis Korea to Participate in World's First Integrated Carbon Sequestration and Hydrogen Production Research Power Plant WASHINGTON, DC - U.S. Energy Secretary Samuel W. Bodman and South Korean Minister of Commerce, Industry & Energy, Chung Sye Kyun, today signed an agreement making South Korea the second country, after India, to join the United States in the FutureGen International Partnership. Korea has pledged $10 million to help build and operate the world's first zero-emissions coal-fired power plant and will sit on a government steering committee to oversee this initiative. Once operational, this plant will remove and sequester carbon dioxide while producing electricity and

146

Final Environmental Impact Statement for the FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT REVISED OCTOBER 2007 5-2 Figure 5-1. Role of the Analog Site Database and Ancillary Databases in the Approach for Conducting the Risk Assessment FINAL RISK ASSESSMENT REPORT REVISED OCTOBER 2007 5-100 Figure 5-6. Area Within Which H 2 S Released from CO 2 Injection Wells Exceeds Chronic Toxicity Criteria (i.e., 0.0014 ppmv H 2 S) at the Tuscola (IL) Site DOE/EIS-0394 FUTUREGEN PROJECT EIS FINAL SUMMARY NOVEMBER 2007 S-10 Figure S-4. Proposed Mattoon Power Plant and Sequestration Site Figure S-5. Proposed Utility Corridors for the Mattoon Power Plant and Sequestration Site Mattoon Power Plant and Sequestration Site Coles County Shelby County Shelby County Moultrie County C a n a d i a n N a t i o n a l R a i l r o a d Lake Shelbyville Lake Paradise C a n a d i a n N a t

147

Department of Energy Takes Another Step Forward on FutureGen Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Takes Another Step Forward on FutureGen Takes Another Step Forward on FutureGen Project in Mattoon, Illinois Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, Illinois July 14, 2009 - 1:00pm Addthis Washington, D.C. - The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country. The Department's decision is based on careful consideration of the proposed project's potential environmental impacts, as well as the program goals and objectives. "The carbon capture and sequestration technologies planned for this flagship facility are vitally important to America and the world," said Energy Secretary Steven Chu. "This step forward demonstrates the

148

Department of Energy Takes Another Step Forward on FutureGen Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Takes Another Step Forward on FutureGen Energy Takes Another Step Forward on FutureGen Project in Mattoon, IL Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, IL July 14, 2009 - 12:00am Addthis Washington, D.C. - The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country. The Department's decision is based on careful consideration of the proposed project's potential environmental impacts, as well as the program goals and objectives. "The carbon capture and sequestration technologies planned for this flagship facility are vitally important to America and the world," said Energy Secretary Steven Chu. "This step forward demonstrates the

149

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network (OSTI)

resource areas, the transmission lines which form the study local area boundary transmission lines under the condition identified several transmission  lines within the  SCE 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

150

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

151

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

152

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

153

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

DOE Green Energy (OSTI)

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

154

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

155

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

156

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Impact Statement: Public Comment Period Ends 09/25/13This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

157

"FutureGen 2.0 Project Draft Environmental Impact Statement Summary"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SHEET SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

158

"FutureGen 2.0 Project Final Environmental Impact Statement Summary"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COVER SHEET COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Final Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

159

NETL: News Release - DOE Selects 5 New Projects to Bolster Nation's Future  

NLE Websites -- All DOE Office Websites (Extended Search)

September 5, 2000 September 5, 2000 DOE Selects 5 New Projects to Bolster Nation's Future Natural Gas Supplies With "deeper and denser" likely to become the axiom for tomorrow's natural gas producers, the Department of Energy is adding five new projects to its natural gas research program. For three of the projects, the target is natural gas buried under extremely hard rock formations, trapped in gas hydrates on the ocean floor, and in remote regions of the Arctic. The other two explore ways to keep low-volume "stripper" gas wells flowing and to boost the amount of "working gas" stored in salt caverns. The projects are the latest to be selected from a broad-ranging competition conducted for the Energy Department's Office of Fossil Energy by the National Energy Technology Laboratory. The five projects have a total value approaching $7 million, $4.7 million of which will be the federal government's share.

160

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

162

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

163

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

164

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

165

Department of Energy Takes Another Step Forward on FutureGen Project in  

NLE Websites -- All DOE Office Websites (Extended Search)

July 14, 2009 July 14, 2009 Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, IL Record of Decision Issued for First US Commercial Scale Carbon Capture and Storage Project Washington, D.C. - The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country. The Department's decision is based on careful consideration of the proposed project's potential environmental impacts, as well as the program goals and objectives. MORE INFO Read the full Record of Decision. "The carbon capture and sequestration technologies planned for this flagship facility are vitally important to America and the world," said

166

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

167

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

168

"FutureGen 2.0 Project Final Environmental Impact Statement Volume II"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX F APPENDIX F Cultural Surveys F1 - Phase I - Site Characterization Locale Survey F2 - Phase I - Meredosia Energy Center Survey F3 - Phase I - Bluff Area Pipeline Right-of-Way Segment Survey F4 - Phase I - Soil Gas Monitoring Locations Survey for the Final Environmental Impact Statement FutureGen 2.0 Project Meredosia, Illinois (Morgan County) Note: This appendix was updated for the Final EIS.

169

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects  

SciTech Connect

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

Spane, Frank A.

2013-04-29T23:59:59.000Z

170

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

171

Moving beyond paralysis: how states and regions are creating innovative transmission policies for renewable energy projects  

SciTech Connect

Experience from state and regional transmission siting initiatives aimed at expanding renewable energy development might offer lessons on how to circumvent traditional barriers to new transmission. Absent a national approach or federal transmission plan, these early models will provide a framework for increasing interstate cooperation. (author)

Schumacher, Allison; Fink, Sari; Porter, Kevin

2009-08-15T23:59:59.000Z

172

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

173

State Transmission Infrastructure Authorities: The Story So Far; December 2007 - December 2008  

DOE Green Energy (OSTI)

This report examines the status and future direction of state transmission infrastructure authorities. It summarizes common characteristics, discusses current transmission projects, and outlines common issues the state infrastructure authorities have faced.

Porter, K.; Fink. S.

2008-05-01T23:59:59.000Z

174

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network (OSTI)

for transfer of renewable energy from the L.A.  Basin  Area April 2008.   Renewable Energy Transmission Initiative.  Commission  Competitive Renewable Energy Zones  California 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

175

Transportation Energy Futures: Project Overview and Findings (Presentation), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation currently accounts for 71% of total U.S. petroleum use and 33% of the Transportation currently accounts for 71% of total U.S. petroleum use and 33% of the nation's total carbon emissions. Energy-efficient transportation strategies and renewable fuels have the potential to simultaneously reduce petroleum consumption and greenhouse gas (GHG) emissions. The U.S. Department of Energy's (DOE) Transportation Energy Futures (TEF) project examines how a combination of multiple strategies could achieve deep reductions in petroleum use and GHG emissions. The project's primary objective is to help inform domestic decisions about transportation energy strategies, priorities, and investments, with an emphasis on underexplored opportunities related to energy efficiency

176

Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider  

E-Print Network (OSTI)

High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

Lebrun, Philippe

2010-01-01T23:59:59.000Z

177

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

Science Conference Proceedings (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

178

Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature Market  

DOE Green Energy (OSTI)

The viability of biomass as transportation fuel depends upon the allocation of limited resources for fuel, power, and products. By focusing on mature markets, this report identifies how biomass is projected to be most economically used in the long term and the implications for greenhouse gas (GHG) emissions and petroleum use. In order to better understand competition for biomass between these markets and the potential for biofuel as a market-scale alternative to petroleum-based fuels, this report presents results of a micro-economic analysis conducted using the Biomass Allocation and Supply Equilibrium (BASE) modeling tool. The findings indicate that biofuels can outcompete biopower for feedstocks in mature markets if research and development targets are met. The BASE tool was developed for this project to analyze the impact of multiple biomass demand areas on mature energy markets. The model includes domestic supply curves for lignocellulosic biomass resources, corn for ethanol and butanol production, soybeans for biodiesel, and algae for diesel. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency project initiated to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

Ruth, M.; Mai, T.; Newes, E.; Aden, A.; Warner, E.; Uriarte, C.; Inman, D.; Simpkins, T.; Argo, A.

2013-03-01T23:59:59.000Z

179

Assessment of Drought due to Historic Climate Variability and Projected Future Climate Change in the Midwestern United States  

Science Conference Proceedings (OSTI)

Understanding the occurrence and variability of drought events in historic and projected future climate is essential to managing natural resources and setting policy. The Midwest region is a key contributor in corn and soybean production, and the ...

Vimal Mishra; Keith A. Cherkauer; Shraddhanand Shukla

2010-02-01T23:59:59.000Z

180

Future Change of Western North Pacific Typhoons: Projections by a 20-km-Mesh Global Atmospheric Model  

Science Conference Proceedings (OSTI)

Projected future changes in tropical cyclone (TC) activity over the western North Pacific (WNP) under the Special Report on Emissions Scenarios (SRES) A1B emission scenario were investigated using a 20-km-mesh, very-high-resolution Meteorological ...

Hiroyuki Murakami; Bin Wang; Akio Kitoh

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Role of Regional SST Warming Variations in the Drying of Meso-America in Future Climate Projections  

Science Conference Proceedings (OSTI)

This paper addresses several hypotheses designed to explain why AOGCM simulations of future climate in the third phase of the Coupled Model Intercomparison Project (CMIP3) feature an intensified reduction of precipitation over the Meso-America (MA)...

Sara A. Rauscher; Fred Kucharski; David B. Enfield

2011-04-01T23:59:59.000Z

182

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

183

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

184

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources.

NONE

1995-11-01T23:59:59.000Z

185

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

186

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

187

Transmission System Efficiency and Utilization Improvement: Summary of R&D Activity and Demonstration Projects  

Science Conference Proceedings (OSTI)

  This report compiles and summarizes the activities, findings, and main conclusions derived from the development of EPRI R&D Program 172 - Efficient Transmission Systems for a Carbon-Constrained World.BackgroundEPRI R&D Program 172, Efficient Transmission Systems for a Carbon-Constrained World, was initiated in 2008 and finalized in 2012. The main objective of the program was to assist utilities to prepare for operating a power-delivery system ...

2012-12-31T23:59:59.000Z

188

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Energy.gov (U.S. Department of Energy (DOE))

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota.

189

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

190

Energy: options for the future. Curriculum development project for high school teachers. Final report. [Packet  

DOE Green Energy (OSTI)

Recent state and regional energy crises demonstrate the delicate balance between energy systems, the environment, and the economy. Indeed, the interaction between these three elements of society is very complex. This project develops curriculum materials that would better provide students with an understanding and awareness of fundamental principles of energy supply, conversion processes, and utilization now and in the future. The project had two specific objectives: to transfer knowledge of energy systems, analysis techniques, and advanced technologies from the energy analyst community to the teacher participants; and to involve teachers in the preparation of modular case studies on energy issues for use within the classroom. These curriculum modules are intended to enhance the teacher's ability to provide energy-related education to students within his or her own academic setting. The project is organized as a three-week summer program, as noted in the flyer (Appendix A). Mornings are spent in seminars with energy and environmental specialists (their handout lecture notes are included as Appendix B); afternoons are devoted to high school curriculum development based on the seminar discussions. The curriculum development is limited to five areas: conservation, electricity demand scheduling, energy in the food system, new technologies (solar, wind, biomass), and environment. Appendix C consists of one-day lession plans in these areas.

Carroll, T.O.

1978-04-01T23:59:59.000Z

191

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

192

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on National Forest lands.

193

PSERC Webinar Series: Issues in Designing the Future Grid- Transmission Design at the National Level- January 24, 2012  

Energy.gov (U.S. Department of Energy (DOE))

PSERC is offering a free, public webinar series from January to May 2012 entitled “Issues in Designing the Future Grid,” focusing on the information hierarchy for the future grid and grid enablers...

194

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

195

Prospects for future projections of the basic energy sources in Turkey  

Science Conference Proceedings (OSTI)

The main goal of this study is to develop the energy sources estimation equations in order to estimate the future projections and make correct investments in Turkey using artificial neural network (ANN) approach. It is also expected that this study will be helpful in demonstrating energy situation of Turkey in amount of EU countries. Basic energy indicators such as population, gross generation, installed capacity, net energy consumption, import, export are used in input layer of ANN. Basic energy sources such as coal, lignite, fuel-oil, natural gas and hydro are in output layer. Data from 1975 to 2003 are used to train. Three years (1981, 1994 and 2003) are only used as test data to confirm this method. Also, in this study, the best approach was investigated for each energy sources by using different learning algorithms (scaled conjugate gradient (SCG) and Levenberg-Marquardt (LM)) and a logistic sigmoid transfer function in the ANN with developed software. The statistical coefficients of multiple determinations (R{sup 2}-value) for training data are equal to 0.99802, 0.99918, 0.997134, 0.998831 and 0.995681 for natural gas, lignite, coal, hydraulic, and fuel-oil, respectively. Similarly, these values for testing data are equal to 0.995623, 0.999456, 0.998545, 0.999236, and 0.99002. The best approach was found for lignite by SCG algorithm with seven neurons so mean absolute percentage error (MAPE) is equal to 1.646753 for lignite. According to the results, the future projections of energy indicators using ANN technique have been obviously predicted within acceptable errors. Apart from reducing the whole time required, the importance of the ANN approach is possible to find solutions that make energy applications more viable and thus more attractive to potential users.

Sozen, A.; Arcaklioglu, E. [Gazi University, Ankara (Turkey). Technical Education Facility

2007-07-01T23:59:59.000Z

196

PROJECTED CONSTRAINTS ON THE COSMIC (SUPER)STRING TENSION WITH FUTURE GRAVITATIONAL WAVE DETECTION EXPERIMENTS  

SciTech Connect

We present projected constraints on the cosmic string tension, G{mu}/c {sup 2}, that could be achieved by future gravitational wave detection experiments and express our results as semi-analytic relations of the form G{mu}({Omega}{sub gw} h {sup 2})/c {sup 2}, to allow for direct computation of the tension constraints for future experiments. These results can be applied to new constraints on {Omega}{sub gw} h {sup 2} as they are imposed. Experiments operating in different frequency bands probe different parts of the gravitational wave spectrum of a cosmic string network and are sensitive to different uncertainties in the underlying cosmic string model parameters. We compute the gravitational wave spectra of cosmic string networks based on the one-scale model, covering all the parameter space accessed by each experiment that is strongly dependent on the birth scale of loops relative to the horizon, {alpha}. The upper limits on the string tension avoid any assumptions on the model parameters. We perform this investigation for Pulsar Timing Array experiments of different durations, as well as ground-based and space-borne interferometric detectors.

Sanidas, Sotirios A.; Battye, Richard A.; Stappers, Benjamin W., E-mail: sotiris.sanidas@gmail.com, E-mail: rbattye@jb.man.ac.uk, E-mail: ben.stappers@manchester.ac.uk [Jodrell Bank Centre for Astrophysics, University of Manchester, Manchester, M13 9PL (United Kingdom)

2013-02-10T23:59:59.000Z

197

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 23.90-mile Salem-Albany No. 1 and 27.85-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

198

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

199

California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning  

E-Print Network (OSTI)

role for industry-led R&D activities. Note that thisAnalysis for PIER Transmission R&D Planning The highestfor public-interest R&D – i.e. , those that emerge as

Eto, Joseph; Stovall, John P.

2003-01-01T23:59:59.000Z

200

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

202

Validation of phasor calculations in the Macrodyne PMU for California-Oregon Transmission Project tests of March 1993  

Science Conference Proceedings (OSTI)

Faults applied during March 1993 commissioning tests for the California-Oregon Transmission Project produced 14 Hz transient oscillations that were conspicuous in BPA`s enhanced transducers at Malin, and in PG and E`s Dynamic System Monitor at Table Mountain. Prony analysis of high speed fault data provided a detailed model for the underlying network resonance signal, and a basis for validating transient performance of a Macrodyne Phasor Measurement Unit (PMU) at the test site. This instrument, which is closely associated with EPRI`s FACTS project, provides useful insight into emerging technology for high speed digital transducers. The phasor calculations are found to be of very high quality, but filtering enhancements are recommended for broadband applications.

Hauer, J.F. [Pacific Northwest Labs., Richland, WA (United States)

1996-07-01T23:59:59.000Z

203

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network (OSTI)

The transportation infrastructure systems in the United States were built between the 50's and 80's, with 20 years design life. As most of them already exceeded their original life expectancy, state transportation agencies (STAs) are now under increased needs to rebuild deteriorated transportation networks. For major highway maintenance projects, a federal rule enforces to perform a life-cycle cost analysis (LCCA). The lack of analytical methods for LCCA creates many challenges of STAs to comply with the rule. To address these critical issues, this study aims at developing a new methodology for quantifying the future maintenance cost to assist STAs in performing a LCCA. The major objectives of this research are twofold: 1) identify the critical factors that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190,000 highway sections in Texas. These data were then grouped by critical performance-driven factor which was identified by K-means cluster analysis. Many factors were evaluated to identify the most critical factors that affect pavement maintenance need. With these data, a series of regression analyses were carried out to develop predictive models. Lastly, a validation study with PRESS statistics was conducted to evaluate reliability of the model. The research results reveal that three factors, annual average temperature, annual precipitation, and pavement age, were the most critical factors under very low traffic volume conditions. This research effort was the first of its kind undertaken in this subject. The maintenance cost lookup tables and stochastic model will assist STAs in carrying out a LCCA, with the reliable estimation of maintenance costs. This research also provides the research community with the first view and systematic estimation method that STAs can use to determine long-term maintenance costs in estimating life-cycle costs. It will reduce the agency's expenses in the time and effort required for conducting a LCCA. Estimating long-term maintenance cost is a core component of the LCCA. Therefore, methods developed from this project have the great potential to improve the accuracy of LCCA.

Kim, Yoo Hyun

2012-05-01T23:59:59.000Z

204

A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report  

DOE Green Energy (OSTI)

A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1994-08-01T23:59:59.000Z

205

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

206

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

207

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

208

The state of computer ethics as a philosophicalfield of inquiry: Some contemporary perspectives, future projections, and current resources  

Science Conference Proceedings (OSTI)

The present article focuses upon three aspects of computer ethics as a philosophical field: contemporary perspectives, future projections, and current resources. Several topics are covered, including various computer ethics methodologies, the `uniqueness' of ... Keywords: conceptual muddles, cyberethics, disclosive computer ethics, global information ethics, internet ethics, just consequentialism, logical malleability, mainstream computer ethics, policy vacuums

Herman T. Tavani

2001-09-01T23:59:59.000Z

209

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

1993-12-01T23:59:59.000Z

210

NETL: News Release - FutureGen Industrial Alliance Announces...  

NLE Websites -- All DOE Office Websites (Extended Search)

considered when siting power plants, such as access to water, fuel delivery systems, and transmission lines, as well as requirements that are unique to the FutureGen project, such...

211

Survey of Electric and Gas Rights-of-Way Practitioners: Current Practices and Views of Future Transmission Line Siting Issues  

Science Conference Proceedings (OSTI)

The adequacy of the nation's power grid is a topic of great concern, particularly the extent of new construction and upgrades required over the next decade to meet increasing energy demand. This report compiles the survey responses of energy company professionals associated with the task of developing rights-of-way. Respondents provided information on current industry practices, as well as the social and regulatory environment in which they operate to secure rights-of-way for new transmission lines and u...

2003-12-04T23:59:59.000Z

212

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

213

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

214

DOE/EIS-0325; Environmental Impact Statement for Schultz-Hanford Area Transmission Line Project (02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Summary Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Summary S-1 Summary In this Summary: * The Purposes and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the Draft Environmental

215

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

216

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

217

Record of Decision for the Los Banos-Gates Transmission Project (DOE/EIS-0128-SA-01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

99 99 Federal Register / Vol. 66, No. 245 / Thursday, December 20, 2001 / Notices A copy of any motion to intervene must also be served upon the representative of the RAWA specified in item h, above. p. Agency Comments-Federal, state, and local agencies are invited to file comments on the subject application for surrender of exemption. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representative listed in item h, above. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 01-31311 Filed 12-19-01; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Los Banos-Gates Transmission Project AGENCY: Western Area Power

218

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

219

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

DOE Green Energy (OSTI)

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

Not Available

1990-07-01T23:59:59.000Z

220

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

SciTech Connect

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

1990-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

IntelliGrid Transmission Architecture Development  

Science Conference Proceedings (OSTI)

Objective Future transmission system operations require the development of a distributed computing infrastructure that can keep up with the demands of new applications as well as the technical pressures being placed on power systems. This project identifies issues related to the supporting communications and distributed computing infrastructures necessary to support the next generation of transmission monitoring, control, and operations. Although substantial work has been completed, more is needed to dev...

2008-03-31T23:59:59.000Z

222

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

223

Final Scientific/Technical Report for Building Transmission Capacity in the Western Interconnection to Support a Low Carbon Future  

SciTech Connect

The Building Transmission Capacity grant activities focused on educating both policy makers (primarily at Public Utility Commissions) and utilities across the West. Western Grid Group (WGG), the grant recipient, chose three methods to reach these audiences - direct outreach, a website that contains information on policies and strategies to integrate more variable generation resources, and a report - The Best of the West, Policies and Practices to Support Transition to a Lower-Carbon Electric Sector in the Western Interconnection and that highlights what is working in the West. While all avenues for education are effective the Best of the West report is the first west-wide assessment of its kind. The report details incremental changes that are working to integrate variable generation but it also expounds on what fundamental or transformative changes are needed to get to the 20% wind penetration and beyond.

Amanda Ormond; Merrisa Walker

2011-03-31T23:59:59.000Z

224

Program on Technology Innovation: Projecting Future Fossil- and Biomass-Fueled Power Generation System Configurations: Year 2030  

Science Conference Proceedings (OSTI)

The generation mix in the year 2030 will likely look somewhat different from the present, as growth in generating capacity and regulatory initiatives to reduce emissions lead to changes in the U.S. power generation fleet. Chemical pollutants emitted from this future generation mix are likely to differ from those at present, including changes to the characteristics and amounts of chemicals released to air, wastewater, and solid waste streams. This report presents interim results of a project to predict he...

2009-12-28T23:59:59.000Z

225

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

226

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

availability and demand needs are incorporated into models to quantify the benefits of new transmission.Availability and use of a common database (consisting of other expected new generation and transmission

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

227

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND  

Energy.gov (U.S. Department of Energy (DOE))

USDA Rural Utilities Service is preparing this EIS to evaluate the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE’s Western Area Power Administration, a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western’s transmission system.

228

Projections of Future Soil Temperature and Water Content for Three Southern Quebec Forested Sites  

Science Conference Proceedings (OSTI)

The impacts of climate change on future soil temperature Ts and soil moisture Ms of northern forests are uncertain. In this study, the authors first calibrated Ts and Ms models [Forest Soil Temperature Model (ForSTeM) and Forest Hydrology Model (...

Daniel Houle; Ariane Bouffard; Louis Duchesne; Travis Logan; Richard Harvey

2012-11-01T23:59:59.000Z

229

Future Changes in Tropical Cyclone Activity Projected by the New High-Resolution MRI-AGCM  

Science Conference Proceedings (OSTI)

New versions of the high-resolution 20- and 60-km-mesh Meteorological Research Institute (MRI) atmospheric general circulation models (MRI-AGCM version 3.2) have been developed and used to investigate potential future changes in tropical cyclone (...

Hiroyuki Murakami; Yuqing Wang; Hiromasa Yoshimura; Ryo Mizuta; Masato Sugi; Eiki Shindo; Yukimasa Adachi; Seiji Yukimoto; Masahiro Hosaka; Shoji Kusunoki; Tomoaki Ose; Akio Kitoh

2012-05-01T23:59:59.000Z

230

Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature MarketProjected Biomass Utilization for Fuels and Power in a Mature Market  

NLE Websites -- All DOE Office Websites (Extended Search)

FUELS Projected Biomass Utilization for Fuels and Power in a Mature Market TRANSPORTATION ENERGY FUTURES SERIES: Projected Biomass Utilization for Fuels and Power in a Mature Market A Study Sponsored by U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 2013 Prepared by NATIONAL RENEWABLE ENERGY LABORATORY Golden, Colorado 80401-3305 managed by Alliance for Sustainable Energy, LLC for the U.S. DEPARTMENT OF ENERGY under contract DC-A36-08GO28308 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or

231

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

DOE Green Energy (OSTI)

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

232

Department of Energy Takes Another Step Forward on FutureGen Project in  

NLE Websites -- All DOE Office Websites (Extended Search)

August 5, 2009 August 5, 2009 President Obama Announces $2.4 Billion in Grants to Accelerate the Manufacturing and Deployment of the Next Generation of U.S. Batteries and Electric Vehicles Recovery Act will fund 48 new advanced battery and electric drive components manufacturing and electric drive vehicle deployment projects in over 20 states Elkhart, Indiana - Further accelerating the manufacturing and deployment of electric vehicles, batteries, and components here in America, and creating tens of thousands of new jobs, President Obama today announced 48 new advanced battery and electric drive projects that will receive $2.4 billion in funding under the American Recovery and Reinvestment Act. These projects, selected through a highly competitive process by the Department of Energy, will accelerate the development of U.S. manufacturing capacity for batteries and electric drive components as well as the deployment of electric drive vehicles, helping to establish American leadership in creating the next generation of advanced vehicles.

233

Livermore energy policy model and projections of energy futures for the Gas Research Institute  

Science Conference Proceedings (OSTI)

The Energy and Resource Planning Group at the Lawrence Livermore National Laboratory (LLNL) was asked by the Gas Research Institute to evaluate ten of their research projects relative to proposed funding levels for 1982. These energy technology projects included gas from unconventional and synthetic sources as well as utilization technologies. The primary tool used in the evaluation was the LLNL Energy Policy Model (EPM). The report gives background information about the study, the basic assumptions used in the study, and some conclusions, and presents selected supporting results from the EPM runs.

Castleton, R.

1981-06-01T23:59:59.000Z

234

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

235

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Energy Research/ Energy System Integration Transmission-Research Program Energy System Integration Public InterestCommission’s PIER Energy Systems Integration program for

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

236

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Case Selection • Natural Gas Prices • Demand • Hydrology •Natural gas price forecast - Near-term new generation - DemandDemand-side alternatives to transmission • Integration of natural gas

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

237

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

238

The DOE Wide Area Measurement System (WAMS) Project: Demonstration of dynamic information technology for the future power system  

SciTech Connect

In 1989 the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands, in an environment where increased competition, a wider range of services and vendors, and much narrower operating margins all contribute to increased system efficiencies and capacity. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment--the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI). The WAMS project also brings added focus and resources to the evolving Western System Dynamic Information Network, or WesDINet. This is a collective response of the Western Systems Coordinating Council (WSCC) member utilities to their shared needs for direct information about power system characteristics, model fidelity, and operational performance. The WAMS project is a key source of the technology and backbone communications needed to make WesDINet a well integrated, cost effective enterprise network demonstrating the role of dynamic information technology in the emerging utility environment.

Mittelstadt, W.A. [USDOE Bonneville Power Administration, Portland, OR (United States); Krause, P.E.; Wilson, R.E. [USDOE Western Area Power Administration, Golden, CO (United States); Overholt, P.N. [USDOE, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

1996-07-01T23:59:59.000Z

239

Estimating the effect of future oil prices on petroleum engineering project investment yardsticks.  

E-Print Network (OSTI)

This study proposes two methods, (1) a probabilistic method based on historical oil prices and (2) a method based on Gaussian simulation, to model future prices of oil. With these methods to model future oil prices, we can calculate the ranges of uncertainty in traditional probability indicators based on cash flow analysis, such as net present values, net present value to investment ratio and internal rate of return. We found that conventional methods used to quantify uncertainty which use high, low and base prices produce uncertainty ranges far narrower than those observed historically. These methods fail because they do not capture the "shocks" in oil prices that arise from geopolitical events or supply-demand imbalances. Quantifying uncertainty is becoming increasingly important in the petroleum industry as many current investment opportunities in reservoir development require large investments, many in harsh exploration environments, with intensive technology requirements. Insight into the range of uncertainty, particularly for downside, may influence our investment decision in these difficult areas.

Mendjoge, Ashish V

2003-12-01T23:59:59.000Z

240

The DOE Wide Area Measurement System (WAMS) Project -- Demonstration of dynamic information technology for the future power system  

DOE Green Energy (OSTI)

In 1989 the Bonneville Power Administration (BPA) and the Western Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands in an environment characterized by increased competition, a wider range of services and vendors, and much narrower operating margins. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI).

Mittelstadt, W.A. [Bonneville Power Administration (United States); Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States); Krause, P.E.; Wilson, R.E. [Western Power Administration (United States); Overholt, P.N. [USDOE (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

INTERNATIONAL FUTURES PROGRAMME PROJECT ON STRATEGIC TRANSPORT INFRASTRUCTURE TO 2030 PENSION FUNDS INVESTMENT IN INFRASTRUCTURE  

E-Print Network (OSTI)

growing importance of investment needs to 2030 for infrastructure in telecommunication, electricity, water and transport, while highlighting at the same time the notion of an emerging “infrastructure gap”. To bridge this “infrastructure gap ” institutional investors were identified as one of the most promising candidates and it was decided to further review opportunities and barriers to investment in infrastructure from the standpoint of pension funds. A survey of a sample of the most significant actors was then launched by the OECD within the framework of the OECD Project on Transcontinental Infrastructure 2030-2050. The main countries

A Survey

2011-01-01T23:59:59.000Z

242

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

NONE

1995-11-01T23:59:59.000Z

243

Advanced neutron source project information management. A model for the future  

SciTech Connect

The Advanced Neutron Source (ANS) is a proposed new research facility that will provide steady-state beams of neutrons for experiments by more than 1000 researchers per year in the fields of materials science and engineering, biology, chemistry, materials analysis, and nuclear science. The facility will also include irradiation capabilities to produce radioisotopes for medical applications, research, industry, and materials testing. This paper discusses the architecture and data flow used by the project, some quantitative examinations of potential cost savings and return on investment and software applications used to generate and manage data across IBM-compatible personal computers, Macintosh, and Unix-based workstations. Personnel management aspects addressed include providing paper copy to users only when needed for adequate technical review, using graded approaches to providing support for numerous user-needed software applications, and implementing a phased approach to compliance with computer-aided acquisition and logistic support (CALS) standards that allows sufficient user flexibility for performing technical tasks while providing needed data sharing and integration.

King-Jones, K.; Cleaves, J.

1995-12-31T23:59:59.000Z

244

Advanced Neutron Source project information management: A model for the future  

SciTech Connect

The Advanced Neutron Source (ANS) is a proposed new research facility that will provide steady-state beams of neutrons for experiments by more than 1,000 researchers per year in the fields of materials science and engineering, biology, chemistry, materials analysis, and nuclear science. The facility will also include irradiation capabilities to produce radioisotopes for medical applications, research, industry, and materials testing. This paper discusses the architecture and data flow used by the project, some quantitative examinations of potential cost savings and return on investment, and software applications used to generate and manage data across IBM-compatible personal computers, Macintosh, and Unix-based workstations. Personnel management aspects addressed include providing paper copy to users only when needed for adequate technical review, using graded approaches to providing support for numerous user-needed software applications, and implementing a phased approach to compliance with computer-aided acquisition and logistic support (CALS) standards that allows sufficient user flexibility for performing technical tasks while providing needed data sharing and integration.

King-Jones, K.; Cleaves, J.

1995-12-31T23:59:59.000Z

245

Intergenerational Transmission of Women’s Educational Attainment in South Korea: An Application of Multi-group Population Projection Model  

E-Print Network (OSTI)

on the educational distribution of future generations ifwomen’s educational distribution in the next generation:distributions of socioeconomic outcomes between generations.

Kye, Bongoh

2008-01-01T23:59:59.000Z

246

Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado  

SciTech Connect

The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

Daniels Jeffrey I.,Chapman Jenny B.

2012-01-01T23:59:59.000Z

247

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

248

Transmission and Distribution Benefits of Direct Load Control: Seattle City Light and Snohomish Public Utility District Pilot Project Evaluations  

Science Conference Proceedings (OSTI)

Two residential direct load control programs in the Puget Sound region have reduced peak loads at both the system as well as the local transmission and distribution levels. This report presents program load impact results estimated using metered and disaggregated end-use load data. Included is a detailed description of participants' attitudes toward the programs and their experiences with program implementation.

1994-05-21T23:59:59.000Z

249

Roseville Direct Service 230 kV Transmission Line Project, Sacramento and Placer Counties, California: Environmental assessment  

SciTech Connect

At present, the only transmission line serving the City of Roseville is operated by Pacific Gas and Electric Company (PG and E), which serves the City's Berry Street substation with a 60-kV circuit from the company's own Atlantic Street substation. Western pays wheeling charges to PG and E for use of their lines to deliver power to its customers which cannot be served directly. PG and E has informed Roseville that additional system facilities are required to meet the City's firm transmission requirements in excess of 69 megawatt peak. They proposed to build a new 230-kV line and transformer bank at a cost of $10.9 million which the City would have to pay, in addition to the wheeling charges Western would be charged to use the PG and E line. The City's preferred alternative is to have Western construct a direct 239-kV service from its Elverta substation to the Berry Street substation. This would save the city money in construction capital cost, result in more transmission capacity and eliminate the present wheeling costs charged to Western. Mitigation recommendations are included.

1986-06-01T23:59:59.000Z

250

Impacts of Future Climate Change on California Perennial Crop Yields: Model Projections with Climate and Crop Uncertainties  

DOE Green Energy (OSTI)

Most research on the agricultural impacts of climate change has focused on the major annual crops, yet perennial cropping systems are less adaptable and thus potentially more susceptible to damage. Improved assessments of yield responses to future climate are needed to prioritize adaptation strategies in the many regions where perennial crops are economically and culturally important. These impact assessments, in turn, must rely on climate and crop models that contain often poorly defined uncertainties. We evaluated the impact of climate change on six major perennial crops in California: wine grapes, almonds, table grapes, oranges, walnuts, and avocados. Outputs from multiple climate models were used to evaluate climate uncertainty, while multiple statistical crop models, derived by resampling historical databases, were used to address crop response uncertainties. We find that, despite these uncertainties, climate change in California is very likely to put downward pressure on yields of almonds, walnuts, avocados, and table grapes by 2050. Without CO{sub 2} fertilization or adaptation measures, projected losses range from 0 to >40% depending on the crop and the trajectory of climate change. Climate change uncertainty generally had a larger impact on projections than crop model uncertainty, although the latter was substantial for several crops. Opportunities for expansion into cooler regions are identified, but this adaptation would require substantial investments and may be limited by non-climatic constraints. Given the long time scales for growth and production of orchards and vineyards ({approx}30 years), climate change should be an important factor in selecting perennial varieties and deciding whether and where perennials should be planted.

Lobell, D; Field, C; Cahill, K; Bonfils, C

2006-01-10T23:59:59.000Z

251

NREL: Energy Analysis - Renewable Electricity Futures Study  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Electricity Futures Study Renewable Electricity Futures Study RE Futures Visualizations These visualizations are based on RE Futures modeling and represent the transformation of the U.S. electric system to a high renewable system from 2010 to 2050 and the hourly operation and transmission flow of that system in 2050. Transformation of the Electric Sector (Compare to Baseline Projections) Screen capture of a dynamic map that is animated to display the transformation of the electric sector in 2010 through 2050 Hourly Operation in 2050 (Compare to Baseline Projections) Screen capture of a dynamic map that is animated to display hourly operation in 2010 through 2050 Power Flow in 2050 (Compare to Baseline Projections) Screen capture of a dynamic map that is animated to display power flow in 2010 through 2050

252

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

253

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

254

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

255

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

256

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

257

Green Island Power Authority Transmission Voltage Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Island Power Authority Transmission Voltage Support System Project Green Island Power Authority Transmission Voltage Support System Project Power point presentation...

258

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

259

RECIPIENT:Princeton Power Systems STATE: NJ PROJECT Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Power Systems Princeton Power Systems STATE: NJ PROJECT Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000293 DE-EE0003640 GFO-000364~001 GOO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, ~terature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

260

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Future Change of North Atlantic Tropical Cyclone Tracks: Projection by a 20-km-Mesh Global Atmospheric Model  

Science Conference Proceedings (OSTI)

Possible future change in tropical cyclone (TC) activity over the North Atlantic (NA) was investigated by comparison of 25-yr simulations of the present-day climate and future change under the A1B emission scenario using a 20-km-mesh ...

Hiroyuki Murakami; Bin Wang

2010-05-01T23:59:59.000Z

262

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

263

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

264

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

265

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

266

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

267

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

268

Observed and Projected Future Shifts of Climatic Zones in Europe and Their Use to Visualize Climate Change Information  

Science Conference Proceedings (OSTI)

A Web site questionnaire survey in Finland suggested that maps illustrating projected shifts of Köppen climatic zones are an effective visualization tool for disseminating climate change information. The climate classification is based on ...

Kirsti Jylhä; Heikki Tuomenvirta; Kimmo Ruosteenoja; Hanna Niemi-Hugaerts; Krista Keisu; Juha A. Karhu

2010-04-01T23:59:59.000Z

269

A Multimodel Assessment of Future Projections of North Atlantic and European Extratropical Cyclones in the CMIP5 Climate Models  

Science Conference Proceedings (OSTI)

The response of North Atlantic and European extratropical cyclones to climate change is investigated in the climate models participating in phase 5 of the Coupled Model Intercomparison Project (CMIP5). In contrast to previous multimodel studies, a ...

Giuseppe Zappa; Len C. Shaffrey; Kevin I. Hodges; Phil G. Sansom; David B. Stephenson

2013-08-01T23:59:59.000Z

270

A Synoptic Weather-Typing Approach to Project Future Daily Rainfall and Extremes at Local Scale in Ontario, Canada  

Science Conference Proceedings (OSTI)

This paper attempts to project possible changes in the frequency of daily rainfall events late in this century for four selected river basins (i.e., Grand, Humber, Rideau, and Upper Thames) in Ontario, Canada. To achieve this goal, automated ...

Chad Shouquan Cheng; Guilong Li; Qian Li; Heather Auld

2011-07-01T23:59:59.000Z

271

Integrating Wildlife Crossing into Transportation Plans and Projects in North America  

E-Print Network (OSTI)

for wildlife in future transportation projects. Traditionaleffects of existing and future transportation projects. Ourand overpasses into future transportation project, everyday

Cramer, Patricia C.; Bissonette, John

2007-01-01T23:59:59.000Z

272

Water Use for Electricity Generation and Other Sectors: Recent Changes (1985-2005) and Future Projections (2005-2030)  

Science Conference Proceedings (OSTI)

This study presents an updated scoping assessment of current and future water withdrawal requirements, compared with water availability, resolved at the level of counties across the contiguous United States. This report will be useful to power sector environment, generation, and delivery managers; power sector planners; government energy and water resource managers and regulators; and the municipal and agricultural sectors.

2011-11-10T23:59:59.000Z

273

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

E-Print Network (OSTI)

wind resource where projects are located, transmission, grid integration,wind resource in which projects are located, as well as development, transmission, integration,

Wiser, Ryan

2013-01-01T23:59:59.000Z

274

Draft Chapter 4: Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A robust interstate electric transmission network must be developed to enable our electricity future. Draft Chapter 4: Transmission Adequacy More Documents & Publications...

275

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

276

The Potential Use of Summer Rainfall Enhancement in Illinois. Part II: Integration of Factors Affecting Enhancement Projects and Future Research  

Science Conference Proceedings (OSTI)

Rain-yield findings were integrated with the average incidence of rain days and areas distribution of rain in a potential rain-modification area in Illinois to simulate regional aspects of a cloud-seeding project over a 13 000 km2 area. Potential ...

Stanley A. Changnon

1993-03-01T23:59:59.000Z

277

Transmission Fast Simulation and Modeling (T-FSM) - Architectural Requirements  

Science Conference Proceedings (OSTI)

EPRI's IntelligridSM program is aimed at transforming today's electric power infrastructure into an intelligent infrastructure of the future that can support major improvements in the areas of security, quality, reliability, and availability. As a key phase of this program, EPRI has undertaken the Transmission Fast Simulation and Modeling (T-FSM) project to use real-time monitoring data to model and simulate system behavior; anticipate changing system conditions; and provide timely response during system...

2005-03-28T23:59:59.000Z

278

Multi-model Mean Nitrogen and Sulfur Deposition from the Atmospheric Chemistry and Climate Model Intercomparison Project (ACCMIP): Evaluation of Historical and Projected Future Changes  

Science Conference Proceedings (OSTI)

We present multi-model global datasets of nitrogen and sulfate deposition covering time periods from 1850 to 2100, calculated within the Atmospheric Chemistry and Climate Model Intercomparison Project (ACCMIP). The computed deposition fluxes are compared to surface wet deposition and ice-core measurements. We use a new dataset of wet deposition for 2000-2002 based on critical assessment of the quality of existing regional network data. We show that for present-day (year 2000 ACCMIP time-slice), the ACCMIP results perform similarly to previously published multi-model assessments. The analysis of changes between 1980 and 2000 indicates significant differences between model and measurements over the United States, but less so over Europe. This difference points towards misrepresentation of 1980 NH3 emissions over North America. Based on ice-core records, the 1850 deposition fluxes agree well with Greenland ice cores but the change between 1850 and 2000 seems to be overestimated in the Northern Hemisphere for both nitrogen and sulfur species. Using the Representative Concentration Pathways to define the projected climate and atmospheric chemistry related emissions and concentrations, we find large regional nitrogen deposition increases in 2100 in Latin America, Africa and parts of Asia under some of the scenarios considered. Increases in South Asia are especially large, and are seen in all scenarios, with 2100 values more than double 2000 in some scenarios and reaching >1300 mgN/m2/yr averaged over regional to continental scale regions in RCP 2.6 and 8.5, ~30-50% larger than the values in any region currently (2000). Despite known issues, the new ACCMIP deposition dataset provides novel, consistent and evaluated global gridded deposition fields for use in a wide range of climate and ecological studies.

Lamarque, Jean-Francois; Dentener, Frank; McConnell, J.R.; Ro, C-U; Shaw, Mark; Vet, Robert; Bergmann, D.; Cameron-Smith, Philip; Dalsoren, S.; Doherty, R.; Faluvegi, G.; Ghan, Steven J.; Josse, B.; Lee, Y. H.; MacKenzie, I. A.; Plummer, David; Shindell, Drew; Skeie, R. B.; Stevenson, D. S.; Strode, S.; Zeng, G.; Curran, M.; Dahl-Jensen, D.; Das, S.; Fritzsche, D.; Nolan, M.

2013-08-20T23:59:59.000Z

279

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

280

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Commnity Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies  

SciTech Connect

The design and performance optimization of particle accelerators is essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC1 Accelerator Science and Technology project, the SciDAC2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modeling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multi-physics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors.

Spentzouris, Panagiotis; /Fermilab; Cary, John; /Tech-X, Boulder; Mcinnes, Lois Curfman; /Argonne; Mori, Warren; /UCLA; Ng, Cho; /SLAC; Ng, Esmond; Ryne, Robert; /LBL, Berkeley

2008-07-01T23:59:59.000Z

282

Commnity Petascale Project for Accelerator Science And Simulation: Advancing Computational Science for Future Accelerators And Accelerator Technologies  

SciTech Connect

The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors.

Spentzouris, Panagiotis; /Fermilab; Cary, John; /Tech-X, Boulder; Mcinnes, Lois Curfman; /Argonne; Mori, Warren; /UCLA; Ng, Cho; /SLAC; Ng, Esmond; Ryne, Robert; /LBL, Berkeley

2011-10-21T23:59:59.000Z

283

Mobility chains analysis of technologies for passenger cars and light duty vehicles fueled with biofuels : application of the Greet model to project the role of biomass in America's energy future (RBAEF) project.  

DOE Green Energy (OSTI)

The Role of Biomass in America's Energy Future (RBAEF) is a multi-institution, multiple-sponsor research project. The primary focus of the project is to analyze and assess the potential of transportation fuels derived from cellulosic biomass in the years 2015 to 2030. For this project, researchers at Dartmouth College and Princeton University designed and simulated an advanced fermentation process to produce fuel ethanol/protein, a thermochemical process to produce Fischer-Tropsch diesel (FTD) and dimethyl ether (DME), and a combined heat and power plant to co-produce steam and electricity using the ASPEN Plus{trademark} model. With support from the U.S. Department of Energy (DOE), Argonne National Laboratory (ANL) conducted, for the RBAEF project, a mobility chains or well-to-wheels (WTW) analysis using the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed at ANL. The mobility chains analysis was intended to estimate the energy consumption and emissions associated with the use of different production biofuels in light-duty vehicle technologies.

Wu, M.; Wu, Y.; Wang, M; Energy Systems

2008-01-31T23:59:59.000Z

284

Mobility chains analysis of technologies for passenger cars and light duty vehicles fueled with biofuels : application of the Greet model to project the role of biomass in America's energy future (RBAEF) project.  

SciTech Connect

The Role of Biomass in America's Energy Future (RBAEF) is a multi-institution, multiple-sponsor research project. The primary focus of the project is to analyze and assess the potential of transportation fuels derived from cellulosic biomass in the years 2015 to 2030. For this project, researchers at Dartmouth College and Princeton University designed and simulated an advanced fermentation process to produce fuel ethanol/protein, a thermochemical process to produce Fischer-Tropsch diesel (FTD) and dimethyl ether (DME), and a combined heat and power plant to co-produce steam and electricity using the ASPEN Plus{trademark} model. With support from the U.S. Department of Energy (DOE), Argonne National Laboratory (ANL) conducted, for the RBAEF project, a mobility chains or well-to-wheels (WTW) analysis using the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed at ANL. The mobility chains analysis was intended to estimate the energy consumption and emissions associated with the use of different production biofuels in light-duty vehicle technologies.

Wu, M.; Wu, Y.; Wang, M; Energy Systems

2008-01-31T23:59:59.000Z

285

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

286

Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint  

DOE Green Energy (OSTI)

Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

2011-01-01T23:59:59.000Z

287

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

benefits from the proposed transmission project c. Modifyingover time from the new transmission uses e. Assessing otherthe Strategic Benefits of Transmission Vikram Budhraja, Fred

Budhraja, Vikram

2010-01-01T23:59:59.000Z

288

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

289

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

290

Community Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies  

SciTech Connect

The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors. ComPASS is in the first year of executing its plan to develop the next-generation HPC accelerator modeling tools. ComPASS aims to develop an integrated simulation environment that will utilize existing and new accelerator physics modules with petascale capabilities, by employing modern computing and solver technologies. The ComPASS vision is to deliver to accelerator scientists a virtual accelerator and virtual prototyping modeling environment, with the necessary multiphysics, multiscale capabilities. The plan for this development includes delivering accelerator modeling applications appropriate for each stage of the ComPASS software evolution. Such applications are already being used to address challenging problems in accelerator design and optimization. The ComPASS organization for software development and applications accounts for the natural domain areas (beam dynamics, electromagnetics, and advanced acceleration), and all areas depend on the enabling technologies activities, such as solvers and component technology, to deliver the desired performance and integrated simulation environment. The ComPASS applications focus on computationally challenging problems important for design or performance optimization to all major HEP, NP, and BES accelerator facilities. With the cost and complexity of particle accelerators rising, the use of computation to optimize their designs and find improved operating regimes becomes essential, potentially leading to significant cost savings with modest investment.

Spentzouris, P.; /Fermilab; Cary, J.; /Tech-X, Boulder; McInnes, L.C.; /Argonne; Mori, W.; /UCLA; Ng, C.; /SLAC; Ng, E.; Ryne, R.; /LBL, Berkeley

2011-11-14T23:59:59.000Z

291

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

292

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

293

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

294

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

295

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

296

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECC’s RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a “plan ” that consists of a package containing a small number of “contingent plans ” that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

297

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

298

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

299

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

300

DOE/EIS-0378-SA-01: Supplement Analysis for the Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement (DOE/EIS-0378-SA-01) (02/05/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 5, 2008 February 5, 2008 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Port Angeles-Juan de Fuca Transmssion Project Final Environmental Impact Statement (DOE/EIS-0378/SA-01) Mark Korsness Project Manager - TEP TPP-3 Proposed Action: Relocation of the marine exit hole for the horizontal directionally drilled (HDD) hole that would be drilled under the Proposed Action. Proposed by: Sea Breeze Olympic Converter LP (Sea Breeze). Location: Port Angeles Harbor near Port Angeles, Washington. Background: As part of its proposed international transmission cable analyzed in the Port Angeles-Juan de Fuca Transmssion Project EIS, Sea Breeze has proposed the drilling of a HDD hole to transition the cable from the sea bed of the Strait of Juan de Fuca to land. The HDD hole

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Quantifying the Value of Hydropower in the Electric Grid: Modeling Results for Future Scenarios  

Science Conference Proceedings (OSTI)

Work reported in this Technical Report is part of a larger study that is made up of multiple components and intends to utilize and enhance tools that can value hydropower assets in a changing electric grid. The study’s main objective is to develop a methodology to facilitate improved valuation and resource planning for pumped storage and conventional hydropower projects in the future electric transmission grid.This report covers Modeling Results for Future Electricity Market ...

2012-12-31T23:59:59.000Z

302

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

303

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

304

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

LLC Place Juno Beach, Florida Zip 33408 Product Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC...

305

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

306

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

307

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

308

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

309

HTS Cable Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cable Projects HTS Cable Projects Fact sheet describing what is being done to modernize electricity transmission and distribution HTS Cable Projects More Documents & Publications...

310

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

311

Concept for Management of the Future Electricity System (Smart...  

Open Energy Info (EERE)

Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System...

312

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

SciTech Connect

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

2012-03-26T23:59:59.000Z

313

RM Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line. About Power Marketing...

314

The TEAM Project  

NLE Websites -- All DOE Office Websites (Extended Search)

on TV The TEAM Project (Transmission Electron Aberration-Corrected Microscope) Recent Publications from TEAM Why What Who How When and Where DOE In December 1959, physicist Richard...

315

Future fuels from Montana  

SciTech Connect

To make America less dependent on foreign oil, Montana Governor Brain Schweitzer pushes for investment in synfuel technology. He advocates coal as the 'new fuel' for cars and believes synfuels from coal can bridge the gap between the petroleum economy of the past and the hydrogen economy of the future. He is pushing for a 'Future Fuels' project to form a public-private partnership to build 20 coal conversion, synfuel manufacturing plants. This could contribute to making the USA energy self-sufficient, more quickly than the FutureGen project, he believes.

Buchsbaum, L.

2006-04-15T23:59:59.000Z

316

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

to equitable recovery of project costs. Our research hasrules, transmission project costs are spread over all userspercentage of total project cost. Experts in the management

Budhraja, Vikram

2010-01-01T23:59:59.000Z

317

Transmission Fast Simulation and Modeling (T-FSM) - Functional Requirements Document  

Science Conference Proceedings (OSTI)

EPRI's IntelligridSM program is aimed at transforming today's electric power infrastructure into an intelligent infrastructure of the future that can support major improvements in the areas of security, quality, reliability, and availability. As a key phase of this program, EPRI has undertaken the Transmission Fast Simulation and Modeling (T-FSM) project to use real-time monitoring data to model and simulate system behavior; anticipate changing system conditions; and provide timely response during system...

2005-03-28T23:59:59.000Z

318

Transmission System SQRA Assessment Methods  

Science Conference Proceedings (OSTI)

Market conditions and increasingly stringent regulatory requirements have focused attention on metrics that quantify the Security, Quality, Reliability, and Availability (SQRA) of transmission systems. This report summarizes the state-of-the-art in performance metrics, provides four case studies of their use, and discusses future trends in reliability metrics, congestion metrics, and benchmarking.

2009-07-31T23:59:59.000Z

319

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

320

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

322

Underground Transmission Construction: Vault and Manhole Design and Current Practices  

Science Conference Proceedings (OSTI)

Underground transmission (UT) cable systems are alternatives to overhead transmission lines, especially if the costs in design and construction of the UT cable systems are further reduced. Among the major activities of an underground transmission cable project, vault (manhole) designs and related safety issues need to be addressed. Manhole design and construction account for one of the major costs in a cable project.

2009-12-08T23:59:59.000Z

323

Global Vegetation and Climate Change due to Future Increases in CO2 as Projected by a Fully Coupled Model with Dynamic Vegetation  

Science Conference Proceedings (OSTI)

Transient simulations are presented of future climate and vegetation associated with continued rising levels of CO2. The model is a fully coupled atmosphere–ocean–land–ice model with dynamic vegetation. The impacts of the radiative and ...

Michael Notaro; Steve Vavrus; Zhengyu Liu

2007-01-01T23:59:59.000Z

324

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

E-Print Network (OSTI)

Moreover, useful cost projections are likely to benefit fromutilize an iterative projection process involving historicalto determine whether projections of future costs are

Wiser, Ryan

2013-01-01T23:59:59.000Z

325

Notice of Intent to prepare an environmental impact statement for the Eastern Plains Transmission Project, Colorado and Kansas (DOE/EIS-0390) (08/02/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

733 Federal Register 733 Federal Register / Vol. 71, No. 148 / Wednesday, August 2, 2006 / Notices term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all

326

ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE  

E-Print Network (OSTI)

Effects of Wildfires on Transmission Line Reliability. Draft16. Projected fire risk to transmission lines for the A217. Projected fire risk to transmission lines for the B1

Sathaye, Jayant

2011-01-01T23:59:59.000Z

327

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

328

Renewable Energy Transmission Initiative Phase 1A  

E-Print Network (OSTI)

94597 Tel: (913) 458-2000 www.bv.com #12;Principal Investigators: Ryan Pletka, Project Manager Andy Potential in RETI Study region. ......... 6-23 Table 6-11. Candidate LFG Projects (3 MW and Greater information to be used in Phase 1B of the California Renewable Energy Transmission Initiative project. 1

329

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

330

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

331

Dominant Mode of Climate Variability, Intermodel Diversity, and Projected Future Changes over the Summertime Western North Pacific Simulated in the CMIP3 Models  

Science Conference Proceedings (OSTI)

A set of multimodel twentieth-century climate simulations for phase 3 of the Coupled Model Intercomparison Project (CMIP3) is analyzed to assess the model reproducibility of the Pacific–Japan (PJ) teleconnection pattern. It is the dominant low-...

Yu Kosaka; Hisashi Nakamura

2011-08-01T23:59:59.000Z

332

A multi-model assessment of future projections of North Atlantic and European extratropical cyclones in the CMIP5 climate models  

Science Conference Proceedings (OSTI)

The response of North Atlantic and European extratropical cyclones to climate change is investigated in the climate models participating in CMIP5 (Fifth Coupled Model Intercomparison Project). In contrast to previous multi–model studies, a feature ...

Giuseppe Zappa; Len C. Shaffrey; Kevin I. Hodges; Phil G. Sansom; David B. Stephenson

333

Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORKSHOP WORKSHOP DOUBLETREE CRYSTAL CITY NOVEMBER 1-2, 2012 Anjan Bose, Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT)  The Grid Tech Team (GTT), established by the Office of the Undersecretary of Energy, was tasked with coordinating grid-related activities across the Department and accelerating modernization of the electric power system.  Currently, the GTT comprise of representatives from OE, EERE, ARPA-E, Fossil Energy, Science, Policy and International Affairs, CFO, and the Office of the Secretary of Energy. Vision of the Future Grid A seamless, cost-effective electricity system, from generation to end- use, capable of meeting all clean energy demands and capacity requirements, while allowing consumer participation and electricity

334

The Smart Engineering Apprentice (SEA) Project is an advanced artificial intelligence model that aims to predict the future failure of rod pump units. Innovative and modern, this  

E-Print Network (OSTI)

increase the amount of usable oil retrieved from each well by the installed rod pump unit therefore that aims to predict the future failure of rod pump units. Innovative and modern, this novel technology provides a new approach to the maintenance of rod pumps through a system that increases efficiency while

Shahabi, Cyrus

335

The Smart Engineering Apprentice (SEA) Project is an advanced artificial intelligence model that aims to predict the future failure of rod pump units. Innovative and modern, this novel  

E-Print Network (OSTI)

increase the amount of usable oil retrieved from each well by the installed rod pump unit therefore that aims to predict the future failure of rod pump units. Innovative and modern, this novel technology provides a new approach to the maintenance of rod pumps through a system that increases efficiency while

Wang, Hai

336

Transmission System: Loss Reduction and Utilization Enhancement  

Science Conference Proceedings (OSTI)

EPRI R&D program 172Efficient Transmission Systems for a Carbon-Constrained Worldcomprises base research activities and a series of demonstration projects under the collaborative efforts led by EPRI, the Federal Energy Regulatory Commission (FERC), and the transmission industry. The program's goal is to understand, through real-life examples, designs that can help build a more efficient transmission system. Base research and development activities under program P172 have set the foundation for the demons...

2011-12-13T23:59:59.000Z

337

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

338

A Multi-Scale and Context Sensitive State-Wide Environmental Mitigation Planning Tool for Transportation Projects in California  

E-Print Network (OSTI)

2007 Proceedings Future Transportation Project Impacts A GISimpacts due to future transportation projects will beby all programmed future transportation projects based on

Thorne, James H.; Girvetz, Evan H; McMcoy, Mike C.

2007-01-01T23:59:59.000Z

339

Transmission Investment: Nourishing a Gnarly Tree  

Science Conference Proceedings (OSTI)

The Federal Energy Regulatory Commission needs to create a proper framework for investors to weigh the economic viability of transmission projects, then step aside. That means allowing investors and utilities to enter into more varied business models, while maintaining the integrity of the stand-alone transmission business.

Renner, Stein B.

2005-09-01T23:59:59.000Z

340

Fast Track Special Project Proposal  

Science Conference Proceedings (OSTI)

A fast track special project is defined as a one-time Division directed endeavor that creates ... project will not result in future operating expenses. ... Cost Analysis

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

342

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

343

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

344

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

345

Study of transmission and protection elements for wind energy generating systems. Volume 1  

DOE Green Energy (OSTI)

Results are reported of a study at Cornell University on transmission, distribution, and protection systems for large wind-energy generators (WEG) connected to an electric utility grid. Configurations for wind farms on flat terrain, mountain-peak clusters, and installations along a ridge were examined. Computer studies of load-flow and short-circuit behavior confirmed the technical feasibility of the proposed systems. Realistic unit costs for the projected transmission and protection schemes range from $109 to $317 per Kw, depending upon choice of configuration and distance from the grid. Cost of protective equipment is found to be a major factor in most cases, tending to be equal or greater than transmission line costs when the WEG units are located five miles or less from the grid. Several alternatives are suggested for future study.

Linke, S; Teshome, A; Yehsakul, P D

1978-04-01T23:59:59.000Z

346

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

347

Application Filling Requirements for Transmission Line and Substation...  

Open Energy Info (EERE)

icon Twitter icon Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) This is the approved revision of this page, as...

348

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

349

EIS-0450: TransWest Express 600 kV Direct Current Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in...

350

China's sustainable energy future: Scenarios of energy and carbon emissions (Summary)  

E-Print Network (OSTI)

availability of supplies of natural gas, China’s Sustainable Energy Future including the West to East Gas Transmission

2004-01-01T23:59:59.000Z

351

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

352

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

353

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

354

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

355

NREL: Transmission Grid Integration - Research Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

356

NETL: Oil & Natural Gas Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil & Natural Gas Projects Transmission, Distribution, & Refining The Instrumented Pipeline Initiative DE-NT-0004654 Goal The goal of the Instrumented Pipeline Initiative (IPI)...

357

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

358

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

that supports the Energy Systems Integration Program throughResearch  Energy Systems Integration  Environmentally to PIER’s Energy Systems Integration Program.   For more 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

359

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

power requirements as a  function of its voltage and reactive power requirements as a function of its voltage andrequirements  require disconnection during abnormal voltages, 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

360

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

Stalled Air Conditioner Compressors,” IEEE Transactions on Stalled  Air Conditioner Compressors,” IEEE Transactions on suggested  that the compressor torque may not be constant.

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

appliances including lighting, refrigerators, dishwashers, clothes washers, dryers, fans, and electronic equipment for developing model databases

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

362

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

thermal resistance value  RH    relative humidity    S    solar gain, shading    SEER    seasonal energy efficiency 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

363

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

Modeling Task  Force white paper, October 2006.   Lu, N. , system simulations.   This white  paper examines the use of task reports  and white papers.  (See appendices. )  The 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

364

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

natural gas, and nuclear generation.  Solar power  generation natural gas, and nuclear generation.  Solar power  generation 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

365

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

kW) and daily usage (kWh/day) of lighting and appliancestypes, space usage, conditioning systems (lighting; heating,usage was far less than the engineer expected. ) The efficiency of home lighting

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

366

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

PSLF that incorporates motor  A?C, ZIP, and electronic load the fractions motors A?C, ZIP, and electronic loads.    Usethat incorporates motor  A?C, ZIP, and  electronic load 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

367

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

photovoltaics generation on  distribution systems? photovoltaics generation on distribution  systems? and distribution systems with distributed generation: An 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

368

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

function (i.e. , the “smart  grid”) could be applied to the now popular title “smart grid. ”  As such  technologies function (i.e. , the “smart grid”) could be  applied to 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

369

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

composition: The total load profile obtained from  load individual load types if  load profiles of individual load composition validation: Load profiles generated by the load 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

370

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

are made of large  number PV generation sources.    7.4.2.aspects of PV generation sources have been identified and large  number PV generation sources”.  Various parametric 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

371

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

Plan) ? Alternate power supply for substation 48VDC Source ~an alternate power supply for the station 48Vdc source, an

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

372

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

373

CURRENT AND FUTURE IGCC TECHNOLOGIES:  

NLE Websites -- All DOE Office Websites (Extended Search)

future. On the other hand, the projected demand for electricity coupled with high fuel costs (particularly high oil prices and volatile natural gas prices) presents a near-term...

374

DOE Hydrogen Analysis Repository: Future Fuel Cell and Internal...  

NLE Websites -- All DOE Office Websites (Extended Search)

Future Fuel Cell and Internal Combustion Engine Automobile Technologies Project Summary Full Title: Future Fuel Cell and Internal Combustion Engine Automobile Technologies: A...

375

Power upgrading of transmission line by combining AC-DC transmission  

Science Conference Proceedings (OSTI)

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal ... Keywords: extra high voltage (EHV)transmission, flexible ac transmission system (FACTS), power system computer-aided design(PSCAD), simultaneous ac-dc power transmission

Jarupula Somlal

2010-07-01T23:59:59.000Z

376

Software project effort assessment  

Science Conference Proceedings (OSTI)

Software project assessments and postmortem analyses can increase the success of future projects and forthcoming project phases. However, although assessments and analyses are well-presented in the software engineering literature, they are short of descriptions ... Keywords: assessment, effort, final report, postmortem, project management, retrospective

Topi Haapio; Anne Eerola

2010-12-01T23:59:59.000Z

377

Future Healthcare  

E-Print Network (OSTI)

Patients want answers, not numbers. Evidence-based medicine must have numbers to generate answers. Therefore, analysis of numbers to provide answers is the Holy Grail of healthcare professionals and its future systems. ...

Datta, Shoumen

2010-12-15T23:59:59.000Z

378

Future tense  

Science Conference Proceedings (OSTI)

Future Tense, one of the revolving features on this page, presents stories and essays from the intersection of computational science and technological speculation, their boundaries limited only by our ability to imagine what will and could be.

Rudy Rucker

2011-07-01T23:59:59.000Z

379

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

380

Secretary Chu Announces Progress on BPA Recovery Act Project | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Progress on BPA Recovery Act Project Progress on BPA Recovery Act Project Secretary Chu Announces Progress on BPA Recovery Act Project August 10, 2009 - 12:00am Addthis Richland, Wash. - With the goal of bringing new jobs and green power to the West, Energy Secretary Steven Chu today announced the start of the McNary-John Day transmission project in Washington and Oregon, which will be funded by $343 million from the American Recovery and Reinvestment Act. The project is expected to deliver almost 600 megawatts of clean, renewable wind energy to homes and business across the West. "These Recovery Act funds are putting people to work today to build the infrastructure that will be vital to our economy in the future," said U.S. Energy Secretary Steven Chu. "By integrating renewable energy sources onto

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Future Energy Pty Ltd | Open Energy Information  

Open Energy Info (EERE)

Energy Pty Ltd Jump to: navigation, search Name Future Energy Pty Ltd Place Victoria, Australia Zip 3121 Sector Wind energy Product Victoria based community wind project developer....

382

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

383

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

384

Fermilab | Plan for the Future | Fermilab's Future  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab's Future Fermilab's Future 2013-2015 Next Fermilab's research program for 2015 and beyond New facilities at Fermilab, the nation's dedicated particle physics laboratory, would provide thousands of scientists from across the United States and around the world with world-class scientific opportunities. In collaboration with the Department of Energy and the particle physics community, Fermilab is pursuing a strategic plan that addresses fundamental questions about the physical laws that govern matter, energy, space and time. Fermilab is advancing plans for the best facilities in the world for the exploration of neutrinos and rare subatomic processes, far beyond current global capabilities. The proposed construction of a two-megawatt high-intensity proton accelerator, Project X, would enable a comprehensive

385

Underground Transmission Cable System Installation and Construction Practices Manual  

Science Conference Proceedings (OSTI)

Installation and construction remain the most expensive implementation components of underground transmission cable systems. Recent advancements in underground transmission have led to more demand for best practices and innovative ways to reduce installation and construction costs in a cable project. EPRI has funded many projects over the years to improve the efficiency and reduce the cost of underground transmission cable installation. Other organizations such as Association of Edison Illuminating Compa...

2009-12-22T23:59:59.000Z

386

Flexible Alternating Current Transmission System Application Guidelines and Operating Strategies  

Science Conference Proceedings (OSTI)

The goals of this project are twofold: to develop flexible alternating current transmission system (FACTS) application guidelines and operating strategies and to provide a technology roadmap for the renewed value proposition of FACTS devices with increased penetration of renewable energy resources, the need for power flow control over existing transmission lines, and tighter voltage regulation at transmission buses. This project focuses on developing technical and economic guidelines for ...

2012-12-17T23:59:59.000Z

387

GTT 2012 Transmission Workshop - Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop - Documents Transmission Workshop - Documents GTT 2012 Transmission Workshop - Documents Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012 Agenda Roster of Attendees Presentation - Overview - Anjan Bose, DOE Presentation - EERE Issues and Opportunities - David Danielson, DOE Presentation - Vision for the Future - Lauren Azar, DOE Presentation - Tomorrow's Power System - Michael Heyeck, EPRI Presentation - FERC Overview - Cheryl LaFleur, FERC Presentation - ISO/RTO Challenges and Opportunities - Carl Monroe, Southwest Power Pool Product - Future Vision & Grid Challenges: Summary Results of Breakout Group Discussions Product - Opportunities to Overcome Key Challenges: Summary Results of Breakout Group Discussions Product - Final Discussion Summary Report

388

The aftermath of primary power and its implications for independent transmission in PJM  

Science Conference Proceedings (OSTI)

The recent decision by the Federal Energy Regulatory Commission in ''Primary Power'' will have fundamental ramifications for transmission investment in the far-reaching PJM footprint. This decision, which is pending on rehearing and will likely be appealed, will determine whether transmission projects that are entitled to regulated rate recovery under the PJM tariff can only be built by incumbent transmission owners and whether new independent transmission entities are limited to building transmission projects on a ''merchant'' basis. (author)

Farrah, Elias G.; Elstein, S. Shamai

2010-08-15T23:59:59.000Z

389

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

390

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

391

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

392

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

393

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

394

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

395

The Substation of the Future: A Feasibility Study  

E-Print Network (OSTI)

The Substation of the Future: A Feasibility Study Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Substation of the Future Engineering Research Center (PSERC) research project T-38 titled "Substation of the Future: A Feasibility

396

Renewable Project Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Overview Project Overview Federal Utility Partnership Working Group 5/6/09 Chandra Shah, NREL 303-384-7557, chandra.shah@nrel.gov National Renewable Energy Laboratory Innovation for Our Energy Future Presentation Overview Federal and utility renewable requirements Power Purchase Agreements (PPA) Western Area Power Administration Federal Renewable Program UESC and renewables * Participating in utility renewable programs - Opportunity Announcement process Renewable projects implemented using appropriations National Renewable Energy Laboratory Innovation for Our Energy Future Biomass Resource

397

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

398

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

399

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

400

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

402

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

403

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

404

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

405

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

406

NREL: Transmission Grid Integration - Glossary of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

system operator) An entity responsible for maintaining system balance, reliability, and electricity market operation. Load forecast A prediction of future demand. For normal...

407

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge...

408

Windy Gap Firming Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

409

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

410

Uncertainty in emissions projections for climate models  

E-Print Network (OSTI)

Future global climate projections are subject to large uncertainties. Major sources of this uncertainty are projections of anthropogenic emissions. We evaluate the uncertainty in future anthropogenic emissions using a ...

Webster, Mort David.; Babiker, Mustafa H.M.; Mayer, Monika.; Reilly, John M.; Harnisch, Jochen.; Hyman, Robert C.; Sarofim, Marcus C.; Wang, Chien.

411

The Human Genome Project: Sequencing the Future  

E-Print Network (OSTI)

. Performance The Office of Science activities target the Secretary's Innovation goal (Lead the world in science to contribute to new strategies for producing new biofuels, cleaning up legacy waste, and sequestering carbon technology, low-enriched uranium (LEU) target technology, LEU solution reactor technology, and neutron

412

National ID project of Nepal: future challenges  

Science Conference Proceedings (OSTI)

Nepal is a small, landlocked and developing country in South Asia. It is bordered by China at North and India at South, East and West. The Government of Nepal, in order to achieve good governance and social-economic development, has initiated the e-Government ... Keywords: Nepal, challenges, government, national ID

Ganesh Prasad Adhikari

2011-09-01T23:59:59.000Z

413

NREL: Energy Analysis - Transportation Energy Futures Project  

NLE Websites -- All DOE Office Websites (Extended Search)

is also available and will be finalized once all reports are released. The Buildings Industry Transportation Electricity Scenarios (BITES) tool is an interactive framework...

414

Current Renewable Energy Technologies and Future Projections  

SciTech Connect

The generally acknowledged sources of renewable energy are wind, geothermal, biomass, solar, hydropower, and hydrogen. Renewable energy technologies are crucial to the production and utilization of energy from these regenerative and virtually inexhaustible sources. Furthermore, renewable energy technologies provide benefits beyond the establishment of sustainable energy resources. For example, these technologies produce negligible amounts of greenhouse gases and other pollutants in providing energy, and they exploit domestically available energy sources, thereby reducing our dependence on both the importation of fossil fuels and the use of nuclear fuels. The market price of renewable energy technologies does not reflect the economic value of these added benefits.

Allison, Stephen W [ORNL; Lapsa, Melissa Voss [ORNL; Ward, Christina D [ORNL; Smith, Barton [ORNL; Grubb, Kimberly R [ORNL; Lee, Russell [ORNL

2007-05-01T23:59:59.000Z

415

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

416

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

417

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

418

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

419

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

420

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

422

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

423

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

424

Transmission/Nepa Database | Open Energy Information  

Open Energy Info (EERE)

Nepa Database Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Document Collections (1) Have a NEPA Document Collection to add that doesn't yet exist in this collection? Make sure it doesn't already exist: Please be sure to search this page by serial number and by document number Add.png Add a new NEPA Document Collection This query has been included to allow you to use the black arrows in the table header cells to sort the table data. Document Name Serial Number Analysis Type Transmission Type Project Area Applicant Lead Agency District Office Project Phase(s) TransWest EIS 600kV Wyoming Western Power Administration BLM BLM Wyoming State Office

425

July 2013 Project Dashboard | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013-07-25-FINAL.pdf More Documents & Publications EM Current Project Performance LNG Export Study - Related Documents 2013 Transmission Reliability Program Peer Review -...

426

ADVANCED RESEARCH PROJECTS AGENCY - ENERGY ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA (DOEEIS-0467) FOSSIL ENERGY 12. Hydrogen Energy California's Integrated Gasification Combined Cycle Project, CA (DOEEIS-0431) 13. FutureGen 2.0 (DOEEIS-0460) 14. Lake...

427

Transmission/Resource Library/MOU | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library/MOU < Transmission‎ | Resource Library Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Memorandums of Understanding (MOUs)for Interstate Transmission Projects Multi-state transmission siting and permitting projects benefit from effective collaboration between government entities, tribes, project

428

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

429

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

430

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

431

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

this project is to design and develop a fuel flexible (coal derived hydrogen or syngas) gas turbine for IGCC and FutureGen type applications that meets DOE turbine performance...

432

Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission  

E-Print Network (OSTI)

for electric transmission systems to endow them with the capability of being reconfigured to a secure of the electric transmission system. There are three basic options for strengthening transmission systems: (1-term planning to strengthen transmission capability is necessary to increase future reliability levels

Kumar, Ratnesh

433

2012 CERTS Transmission Reliability R&D Internal Program Review...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY12 DOE - CERTS Transmission Reliability R&D Internal Program Review June 12-13, 2012 LBNL Project Office 901 D St., SW Washington DC Nancy Lewis' cell: 510.918.3155 Revised...

434

Table of Contents iii Alternative Business Models forTransmission  

E-Print Network (OSTI)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-24 For-Profit Transmission Companies and Merchant Transmission Projects in the U.S. . . . C-24 are reflected in the diversity of market designs in the U.S. and abroad. The Pennsylvania-New Jersey business models based largely on the ownership of the grid. In the U.S., where a large portion of the grid

Oren, Shmuel S.

435

Generation and Transmission Maximization Model | Open Energy Information  

Open Energy Info (EERE)

Generation and Transmission Maximization Model Generation and Transmission Maximization Model Jump to: navigation, search Tool Summary Name: Generation and Transmission Maximization Model Agency/Company /Organization: Argonne National Laboratory Sector: Energy Topics: Pathways analysis Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.dis.anl.gov/projects/Gtmax.html Cost: Paid Generation and Transmission Maximization Model Screenshot References: Generation and Transmission Maximization Model [1] Logo: Generation and Transmission Maximization Model The GTMax model helps researchers study complex marketing and system operational issues. With the aid of this comprehensive model, utility operators and managers can maximize the value of the electric system, taking into account not only its limited energy and transmission resources,

436

GRR/Section 8 - Transmission Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8 - Transmission Overview GRR/Section 8 - Transmission Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8 - Transmission Overview 08 - TransmissionOverview.pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Regulations & Policies FERC Order No. 2003 FERC Order No. 2006 Triggers None specified Click "Edit With Form" above to add content 08 - TransmissionOverview.pdf 08 - TransmissionOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The siting of an individual project can have a major impact on transmission and interconnection. 8.1 - Will the Power Plant Developer Negotiate an Interconnection

437

Transportation Energy Futures  

E-Print Network (OSTI)

A Comparative Analysis of Future Transportation Fuels. ucB-prominentlyin our transportation future, powering electricTransportation Energy Futures Daniel Sperling Mark A.

DeLuchi, Mark A.

1989-01-01T23:59:59.000Z

438

Underground Transmission Cable System Construction and Installation Practices Manual  

Science Conference Proceedings (OSTI)

A reliable underground transmission line depends on reliable cable system manufacturing, design, construction, installation, and operation and maintenance. Construction and installation remain the most expensive component to implement. Recent advances in underground transmission have led to more demand for best practices and innovative ways to reduce construction and installation costs in a cable project. The Electric Power Research Institute (EPRI) has funded many projects over the years to improve the ...

2010-12-03T23:59:59.000Z

439

Transmission line environmental assessment guidance document  

Science Conference Proceedings (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

440

Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08  

Science Conference Proceedings (OSTI)

Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

N /A

2001-04-23T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

442

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

444

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

445

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

446

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

447

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

448

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

449

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

450

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

451

WECC releases its first-ever transmission plan for the Western...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection. The Plan was developed through WECC's Regional Transmission Expansion Planning (RTEP) project, as part of a grant from the U.S. Department of Energy...

452

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

453

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

454

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

455

Application Filling Requirements for Transmission Line and Substation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Wind Solar Program Info

456

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

457

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

458

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

459

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

460

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |  

NLE Websites -- All DOE Office Websites (Extended Search)

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity, consistency, and transparency by describing each entity's role and responsibilities when project applicants wish to build electric transmission facilities. Additionally, the MOU designates a "Lead Agency" serving as the single point-of-contact for coordinating all federal environmental reviews

462

DOE Seeking Information on Transmission Line Permitting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

463

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

464

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

465

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

466

Record of Decision for the Modification and Construction of Transmission Lines for the U.S. 93 Hoover Dam Bypass Project (DOE/EIS-0352) (10/1/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Federal Register / Vol. 67, No. 190 / Tuesday, October 1, 2002 / Notices ''Procedures for Public Participation in Power and Transmission Rate Adjustment,'' has been followed in connection with the proposed rate adjustment. More specifically, opportunities for public review and comment during a 90-day period on the proposed Rayburn power rate were announced by notice published in the Federal Register, May 21, 2002, 67 FR 35805. A Public Information Forum was scheduled to be held June 6, 2002, and a Public Comment Forum was scheduled to be held July 10, 2002, both in Tulsa, Oklahoma. Both forums were canceled as no one expressed an intent to participate. Written comments were due by August 19, 2002. Southwestern provided notice of the Federal Register,

467

Edmund G. Brown Jr. LIGHTING CALIFORNIA'S FUTURE  

E-Print Network (OSTI)

Edmund G. Brown Jr. Governor LIGHTING CALIFORNIA'S FUTURE: SMART LIGHT-EMITTING DIODE LIGHTING's Future: Smart LightEmitting Diode Lighting in Residential Fans. California Energy Commission, PIER. For the Smart Light emitting Diode Lighting in Residential Fans Project, the California Lighting Technology

468

Power transmission investment analysis: a new financial Evaluation framework for South Africa  

Science Conference Proceedings (OSTI)

A proposed framework for power transmission expansion projects in South Africa incorporates the modeling of project options and uncertainties, Monte Carlo simulations, real option analysis, and decision analysis, based on a foundation of strategic analysis. (author)

Maboke, Silky Ntombifuthi; Kachienga, Michael Ogembo

2008-05-15T23:59:59.000Z

469

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

470

California/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

California/Transmission/State Regulations California/Transmission/State Regulations < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process Transmission lines 200 kV or greater are required to undergo a two-part state siting and permitting process with the California Public Utility Commission (CPUC). One part of the process will analyze the need for the project and consists of obtaining a Certificate of Public Convenience and Necessity (CPCN) from the California Energy Commission (CEC). The other part of the process will analyze environmental and community impacts in the

471

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

472

DSW Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

473

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

474

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

475

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

476

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

477

High-Temperature Superconductivity Cable Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Temperature Temperature Superconductivity Cable Demonstration Projects Superconductivity Power Equipment www.oe.energy.gov Phone: 202-586-1411 Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585. Plugging America Into the Future of Power "A National Effort to Introduce New Technology into the Power Delivery Infrastructure" "In order to meet President Obama's ambitious energy goals, we must modernize the nation's electrical grid to improve the transmission, storage and reliability of clean energy across the country and help to move renewable energy from the places it can be produced to the places it can be used. The Department of Energy is working with industry partners to develop the

478

Transmission System Efficiency Technology and Methodology Assessment  

Science Conference Proceedings (OSTI)

Reducing the carbon footprint of the electric power industry and increasing the role of renewable energy are crucial parts of a strategy for the greening of electric energy supply. This work describes the technological options available to reduce losses in transmission systems. It presents a comprehensive framework that can be applied consistently and uniformly to all energy efficiency demonstration projects to identify and quantify the various types of benefits in a standardized manner. The framework id...

2010-12-15T23:59:59.000Z

479

DOE Hydrogen Analysis Repository: H2A Case Study: Future Distributed...  

NLE Websites -- All DOE Office Websites (Extended Search)

Steam Reformer Project Summary Full Title: H2A Case Study: Future (2025) Ethanol Steam Reformer (SR) at Forecourt 1500 kgday Project ID: 241 Principal Investigator: Brian James...

480

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z