1

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

2

Background, status and future of the Transmission Electron Aberration-corrected Microscope project  

Science Journals Connector (OSTI)

...Microscope project Recent advances in aberration-correcting...DOEs) Office of Science to jointly design...great interest for aerospace and cryogenic applications...be possible to advance to a new level...heart of materials science. At this level...

2009-01-01T23:59:59.000Z

3

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

4

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

5

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

6

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

7

HVDC transmission: a path to the future?  

SciTech Connect (OSTI)

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

8

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

9

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

10

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

11

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

12

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

13

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

14

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

15

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

16

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

17

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

18

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

19

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

20

Transportation Energy Futures Series: Projected Biomass Utilization...  

Office of Scientific and Technical Information (OSTI)

Projected Biomass Utilization for Fuels and Power in a Mature Market TRANSPORTATION ENERGY FUTURES SERIES: Projected Biomass Utilization for Fuels and Power in a Mature Market A...

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

22

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

23

BPA, Transmission, I-5 Corridor Project, data by segments and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

24

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

25

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

26

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Broader source: Energy.gov (indexed) [DOE]

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

27

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

28

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Broader source: Energy.gov [DOE]

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

29

Energy Efficiency of Future Networks Energy Efficient Transmission in  

E-Print Network [OSTI]

Energy Efficiency of Future Networks Part 1: Energy Efficient Transmission in Classical Wireless #12;Goals Energy Efficiency: What it meant last decade; what it means today From a communication network design perspective what should we care about for energy efficient design of cellular

Ulukus, Sennur

30

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Broader source: Energy.gov (indexed) [DOE]

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

31

EIS-0231: Navajo Transmission Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

32

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Program’s Wind Integration, Transmission, and Resource Assessment and Characterization Projects from FY 2006 to FY 2014.

33

BPA, Transmission, I-5 Corridor Reinforcement Project, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration has refined the potential transmission line route segments and substation sites for the proposed I-5 Corridor Reinforcement Project. The refinements are...

34

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

environmental impact statement (EIS) for our proposed I-5 Corridor Reinforcement Project. BPA is proposing to build a 500-kilovolt transmission line to reinforce the high-voltage...

35

BPA, Transmission, I-5 Corridor Reinforcement Project, presentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 17 Factors we consider Electrical needs for...

36

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office’s Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014.

37

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Broader source: Energy.gov (indexed) [DOE]

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

38

The Electricity Transmission System Future Vision & Grid Challenges  

Broader source: Energy.gov (indexed) [DOE]

Future Vision & Grid Challenges Future Vision & Grid Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 1, 2012 Breakout Group Discussion Overview Future Vision and Grid Challenges Each of the four breakout groups identified the key challenges facing the grid as it integrates all of the various technologies that are (or will be) deployed while ensuring a safe, reliable, and cost-effective system as described in the Future Vision. Utilizing the Grid Tech Team framework, each group identified integration challenges through a systems-based discussion that addressed all of the following topics: * Grid Visibility What challenges in the informational domain (sensors and relays, AMIs, PMUs, end-use energy

39

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

40

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

42

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

43

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

44

Northern Pass Transmission Line Project Environmental Impact Statement:  

Broader source: Energy.gov (indexed) [DOE]

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

45

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer,  

Broader source: Energy.gov (indexed) [DOE]

8: Antelope Valley Station to Neset Transmission Project, 8: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND SUMMARY USDA Rural Utilities Service is preparing this EIS to evaluate the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western's transmission system. PUBLIC COMMENT OPPORTUNITIES No Public Comment Opportunities at this time

46

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

47

SciTech Connect: Transportation Energy Futures Series: Projected...  

Office of Scientific and Technical Information (OSTI)

Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature Market Citation Details In-Document Search Title: Transportation Energy Futures...

48

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

49

Subject: SPPR Proposed ED5 to Palo Verde Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date: 832010 4:02 PM Subject: SPPR Proposed ED5 to Palo Verde Transmission Project VIA ELECTRONIC MAIL TO: DSWFPP@wapa.gov August 3, 2010 Mr. Darrick...

50

Subject: SPPR Proposed ED5 to Palo Verde Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date: 832010 4:04 PM Subject: SPPR Proposed ED5 to Palo Verde Transmission Project VIA ELECTRONIC MAIL TO: DSWFPP@wapa.gov August 3, 2010 Mr. Darrick...

51

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

52

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the project...

53

Energy Department, Arizona Utilities Announce Transmission Infrastructure Project Energization  

Broader source: Energy.gov [DOE]

Today, the Department of Energy’s Western Area Power Administration (Western) and a group of Arizona utilities celebrated the energizing of a new transmission infrastructure project that will serve the state’s growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern United States.

54

Eldorado Ivanpah Transmission Project | Open Energy Information  

Open Energy Info (EERE)

of all necessary local, state, and federal approvals, authorizations and permits. Data Completion Notes BLM Project website: http:www.blm.govcastenfoneedles...

55

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

56

Southwest Transmission Cooperative, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Inc. Smart Grid Project Inc. Smart Grid Project Jump to: navigation, search Project Lead Southwest Transmission Cooperative, Inc. Country United States Headquarters Location Benson, Arizona Recovery Act Funding $32,244,485.00 Total Project Value $64,488,970.00 Coverage Area Coverage Map: Southwest Transmission Cooperative, Inc. Smart Grid Project Coordinates 31.9678611°, -110.2945174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

57

Midwest Independent Transmission System Operator Smart Grid Project | Open  

Open Energy Info (EERE)

Operator Smart Grid Project Operator Smart Grid Project Jump to: navigation, search Project Lead Midwest Independent Transmission System Operator Country United States Headquarters Location Carmel, Indiana Additional Benefit Places Iowa, Illinois, Michigan, Minnesota, Missouri, Montana, North Dakota, Ohio, Pennsylvania, South Dakota, Wisconsin Recovery Act Funding $17,271,738.00 Total Project Value $34,543,476.00 Coverage Area Coverage Map: Midwest Independent Transmission System Operator Smart Grid Project Coordinates 39.978371°, -86.1180435° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

58

American Transmission Company LLC II Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $11,444,180 Total Project Value $22,888,360 Coverage Area Coverage Map: American Transmission Company LLC II Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

59

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

60

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

BPA, Transmission, I-5 Corridor Reinforcement Project, Project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for this project, we have defined four route alternatives by combining route segments and substation sites. We are sharing this information with you now, because we expect to refer...

62

American Transmission Company LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

American Transmission Company LLC American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $1,330,825.00 Total Project Value $2,661,650.00 Coverage Area Coverage Map: American Transmission Company LLC Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

63

McMinnville Area Support Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

This document discusses a project to provide continuing reliable electrical service to the McMinnville, Oregon, area. BPA proposes to participate with the City of McMinnville Water and Light Department in constructing a new 230-kilovolt transmission line and substation. BPA has prepared an environmental assessment evaluating the proposed project. Reasons that constructing the line and substation would not cause significant environmental impact include: consistency with local land use plans, consistency of appearance with existing transmission and manufacturing facilities in the area, only slight effect on farmland, and avoidance of wetlands and other environmentally sensitive areas. A finding is included that there is no practicable alternative to locating the project within a 100-year floodplain. 1 fig.

United States. Bonneville Power Administration.

1990-01-01T23:59:59.000Z

64

FutureGen Project Launched | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FutureGen Project Launched FutureGen Project Launched FutureGen Project Launched December 6, 2005 - 4:29pm Addthis Government, Industry Agree to Build Zero-Emissions Power Plant of the Future WASHINGTON, DC -- Secretary of Energy Samuel W. Bodman today announced that the Department of Energy has signed an agreement with the FutureGen Industrial Alliance to build FutureGen, a prototype of the fossil-fueled power plant of the future. The nearly $1 billion government-industry project will produce electricity and hydrogen with zero-emissions, including carbon dioxide, a greenhouse gas. The initiative is a response to President Bush's directive to develop a hydrogen economy by drawing upon the best scientific research to address the issue of global climate change. Today's announcement marks the official

65

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

kV line is upgraded.   The Tehachapi Renewable Transmission Transmission Project and the Palo Verde/Harquahala?Devers No.  2  500 kV line 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

66

Transmission Asset Optimization (and) A Contrarian View of the Future of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Asset Optimization (and) A Contrarian View of the Future of Transmission Asset Optimization (and) A Contrarian View of the Future of Distributed Generation vs. Central Station Generation Speaker(s): Dale Bradshaw Date: June 5, 2000 - 10:00am Location: 90-3148 Seminar Host/Point of Contact: David Faulkner This was a two part seminar: Part One: Transmission Asset Optimization Presentation of latest technology developments that can increase the flow of power over todays transmission lines, thus potentially reducing total costs for transmitting power, while improving transmission reliability. Technologies discussed include FACTs devices, energy storage, etc.) Part Two: A Contrarian View of the Future of Distributed Generation vs. Central Station Generation: There have been a lot claims and hype concerning the relative competitive position in the future of distributed generation (DG)

67

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

68

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

1 1 Summary Summary * The Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the BPA/Lower Valley Transmission Project by Bonneville Power Administration (BPA). BPA is the lead federal agency on this project and supervises the preparation of the EIS. The U.S. Forest Service is a cooperating agency and assists BPA in EIS preparation. The Targhee and Bridger-Teton National Forests are crossed by BPA's existing transmission line and some of the alternatives. S.1 Purpose and Need For Action S.1.1 BPA Lower Valley Power and Light, Inc. (LVPL) buys electricity from BPA and then supplies it to the residences, farms and businesses of the Jackson and Afton, Wyoming areas. Since the late 1980s,

69

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Broader source: Energy.gov (indexed) [DOE]

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

70

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

71

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

72

The Future of Offshore Wind Energy and Transmission in New Jersey...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 11, 2013, 4:15pm to 5:30pm Colloquia MBG Auditorium The Future of Offshore Wind Energy and Transmission in New Jersey Kris Ohleth The Atlantic Wind Connection Offshore...

73

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

74

COLLOQUIUM: Future Projections of Climate Change: An Update from...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

May 28, 2014, 4:00pm to 5:30pm Colloquia MBG Auditorium COLLOQUIUM: Future Projections of Climate Change: An Update from IPCC AR5IPCC AR5 WG1 Report Dr. Claudia Tebaldi NCAR I will...

75

Quantifying Sources of Uncertainty in Projections of Future Climate  

Science Journals Connector (OSTI)

A simple statistical model is used to partition uncertainty from different sources, in projections of future climate from multimodel ensembles. Three major sources of uncertainty are considered: the choice of climate model, the choice of emissions ...

Paul J. Northrop; Richard E. Chandler

2014-12-01T23:59:59.000Z

76

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

77

Oak Ridge Project Opens Possibilities for Future Mission Work, Development  

Broader source: Energy.gov (indexed) [DOE]

Project Opens Possibilities for Future Mission Work, Project Opens Possibilities for Future Mission Work, Development Oak Ridge Project Opens Possibilities for Future Mission Work, Development April 29, 2013 - 12:00pm Addthis Environmental sampling helps identify which reservation locations are not contaminated. Environmental sampling helps identify which reservation locations are not contaminated. OAK RIDGE, Tenn. - EM is refining the picture of uncontaminated areas within the 33,500-acre Oak Ridge Reservation through a review of historic documents and extensive sampling, analysis and characterization. The EM program has verified thousands of acres are not contaminated, or otherwise meet existing regulatory standards, and therefore do not require cleanup, creating possibilities for future mission work and economic development.

78

International project development -- Strategies for the future  

SciTech Connect (OSTI)

It seems everywhere one looks today the international power development markets look incredibly large. 150,000 MWs are needed in China, 50,000 MWs are needed in India, 15,000 MWs are needed in Indonesia, 25,000 MWs are needed in Brazil. The list goes on and on and according to current IPP ``mythology`` these markets offer potential projects providing ``huge`` internal rates of return on investment. Unfortunately, against this favorable market backdrop remain some irrefutable facts; (1) There is not enough fabrication capacity in the world to meet the current capacity addition requirements, (2) There is not enough debt capital in the world to finance all the required MWs, further portfolio considerations reduce this on a country-by-country basis. (3) There are not enough qualified development and operational personnel to develop, construct and manage all of these projects. This paper will attempt to cover the broad mosaic of issues relative to the international development market. The authors illuminate the risks that will help optimize development funds, and human resources as well as the issues surrounding construction and operations.

Gross, S.B.; Maynard, B.H. [Entergy Power Group, Little Rock, AR (United States)

1995-12-31T23:59:59.000Z

79

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

80

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

1 9 9 7 1 9 9 7 B PA / L O W E R VA L L E Y T R A N S M I S S I O N P R O J E C T Final Environmental Impact Statement DOE/EIS-0267 J U N E 1 9 9 8 Bonneville Power Administration PO Box 3621 Portland, Oregon 97208-3621 DOE/BP-3067 JUNE 1998 450 Final Environmental Impact Statement BPA/Lower Valley Transmission Project Bonneville Power Administration U.S. Department of Energy and Forest Service U.S. Department of Agriculture June 1998 Table of Contents - i Table of Contents Summary ............................................................................................................................ S-1 S.1 Purpose and Need For Action ................................................................................................ S-1 S.1.1 BPA ...............................................................................................................................................

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

82

Transportation Energy Futures: Project Overview and Findings (Presentation)  

SciTech Connect (OSTI)

The U.S. Department of Energy-sponsored Transportation Energy Futures (TEF) project examines how combining multiple strategies could reduce both GHG emissions and petroleum use by 80%. The project's primary objective was to help inform domestic decisions about transportation energy strategies, priorities, and investments, with an emphasis on previously underexplored opportunities related to energy efficiency and renewable energy in light-duty vehicles, non-light-duty vehicles, fuels, and transportation demand. This PowerPoint provides an overview of the project and its findings.

Not Available

2013-03-01T23:59:59.000Z

83

PROJECTED EFFECTS OF FUTURE CLIMATES ON FRESHWATER FISHES  

E-Print Network [OSTI]

PROJECTED EFFECTS OF FUTURE CLIMATES ON FRESHWATER FISHES OF CALIFORNIA A White Paper from the California Energy Commission's California Climate Change Center JULY 2012 CEC5002012028 A methodology is presented that allows systematic evaluation of climate change impacts on freshwater fishes

84

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

85

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

86

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

87

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Broader source: Energy.gov (indexed) [DOE]

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

88

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

89

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Broader source: Energy.gov (indexed) [DOE]

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

90

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Broader source: Energy.gov (indexed) [DOE]

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

91

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

92

BPA, transmission, I-5 Corridor Reinforcement Project, new Permission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

also identify protective measures that BPA would take during the construction process if BPA decides to build a transmission line or substation. An archeologist or historian may...

93

BPA transmission, I-5 corridor reinforcement project, updated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Proposed New Substation sde.SDE.BPAPlannedTlines sde.SDE.BPAPlannedTlines BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

94

BPA Transmission, I-5 Corridor Reinforcement Project, Scoping...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the transmission lines and consider energy efficiency strategies. Commenters also asked BPA to consider whether a new substation will be needed half-way between Troutdale and...

95

BPA, Transmission, I-5 Corridor Reinforcement Project Map, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lettered route segments added for consideration Segments no longer being considered 5 K BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

96

BPA, proposed I-5 Corridor Reinforcement transmission project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

97

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect (OSTI)

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

98

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

99

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

100

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE/EA-1644: Kildeer to Mountain Transmission Project Pre-Decisional Environmental Assessment (May 2009)  

Broader source: Energy.gov (indexed) [DOE]

KILLDEER TO MOUNTAIN KILLDEER TO MOUNTAIN TRANSMISSION PROJECT PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT MAY 5, 2009 DOE/EA-1644 PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT KILLDEER TO MOUNTAIN PAGE i MAY 2009 TRANSMISSION PROJECT DOE/EA -1644 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................. 1-1 1.1 Purpose of and Need for Action ........................................................................................... 1-1 1.1.1 Project Purpose ............................................................................................................ 1-1 1.1.2 Western's Purpose and Need ..................................................................................... 1-1

102

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

96: San Luis Transmission Project, Alameda, Merced, San 96: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California Summary DOE's Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. Western proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a

103

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

104

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

105

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) DOT $26,383.66 Total Project Cost $26,383.66 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand Project This white paper will summarize recent research findings pertaining to future passenger travel

California at Davis, University of

106

EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EIS to assess the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility that would connect with LVE's existing transmission system in northeastern Caribou County. The proposed new transmission line would be about 22 to 33 miles depending on the route alternative or option.

107

Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Port Angeles-Juan de Fuca Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS-0378 October 2007 Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS - 0378 D e p a r t m e n t o f E n e r g y Office of Electricity Delivery and Energy Reliability and Bonneville Power Administration October 2007 Port Angeles-Juan de Fuca Transmission Project DOE/EIS-0378 Responsible Agency: U.S. Department of Energy (DOE): Office of Electricity Delivery and Energy Reliability (OE) and Bonneville Power Administration (BPA) Title of Proposed Project: Port Angeles-Juan de Fuca Transmission Project State Affected: Washington (WA) Abstract: Sea Breeze Olympic Converter LP (Sea Breeze) has applied to DOE for authorizations and approvals

108

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

109

BPA, transmission, I-5 Corridor Reinforcement Project, letter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

made to the PEP form and how they affect any rights you may or have granted. Background - BPA is proposing to build a 500-kilovolt transmission line and associated substations. The...

110

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

111

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

112

EIS-0496: San Luis Transmission Project, Alameda, Merced, San...  

Energy Savers [EERE]

proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and...

113

Carbon Capture and Storage FutureGen 2.0 Project Moves Forward...  

Broader source: Energy.gov (indexed) [DOE]

Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase February 4, 2013 - 7:25pm...

114

BPA, Transmission, I-5 Corridor Reinforcement Project, meeting...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA I-5 Corridor Reinforcement Project - AugustSeptember 2010 Open Houses Page 1 of 4 Meeting Summary and Survey Results BPA I-5 Corridor Reinforcement Project - AugustSeptember...

115

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

116

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

117

File:08-CA-d - CPCN for Transmission Projects (2).pdf | Open...  

Open Energy Info (EERE)

(2).pdf Jump to: navigation, search File File history File usage Metadata File:08-CA-d - CPCN for Transmission Projects (2).pdf Size of this preview: 463 599 pixels....

118

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

119

EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA  

Broader source: Energy.gov [DOE]

This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

120

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

BPA, Transmission, I-5 Corridor Reinforcement Project, January...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

soon as possible. The decision document is available on the I-5 Project website at www.bpa.govgoi5. Non-wire measures won't delay route analysis As plans take shape to address...

122

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

123

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

I I Chapters 1-3, 8-12 Appendices NOVEMBER 2007 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for FutureGen Project (DOE/EIS-0394) Location: Mattoon, Illinois; Tuscola, Illinois; Jewett, Texas; and Odessa, Texas Contact: For further information about this Environmental Impact Statement, contact: For general information on the U.S. Department of Energy's process for implementing the National Environmental Policy Act, contact: Mark McKoy, Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 (304) 285-4426 or fax (304) 285-4403 Carol Borgstrom, Director

124

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

Summary NOVEMBER 2007 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for FutureGen Project (DOE/EIS-0394) Location: Mattoon, Illinois; Tuscola, Illinois; Jewett, Texas; and Odessa, Texas Contact: For further information about this Environmental Impact Statement, contact: For general information on the U.S. Department of Energy's process for implementing the National Environmental Policy Act, contact: Mark McKoy, Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 (304) 285-4426 or fax (304) 285-4403 Carol Borgstrom, Director

125

Scenario Projections for Future Market Potentials of Biobased Bulk Chemicals  

Science Journals Connector (OSTI)

Product values are production costs plus profits, and they include variable costs, fixed costs, taxes, insurance fees, plant overheads, allowance for marketing, administration, and R&D, as well as a so-called capital charge representing depreciation and profits. ... Future fossil fuel prices depend on (global) political developments, developments of reserves, exploitation of different fossil resources, and demand. ... This research was partly supported by the European Commission (Research Directorate General), 5th Framework European Network (GROWTH) Program by support of the project “BREW” with the full title “Medium and long-term opportunities and risks of the biotechnological production of bulk chemicals from renewable resources” (Contract No. G5MA-CT-2002-00014). ...

Veronika Dornburg; Barbara G. Hermann; Martin K. Patel

2008-02-23T23:59:59.000Z

126

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

127

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) Caltrans $26,383 Total Project Cost $26,383 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand DTRT13-G-UTC29 Start and End Dates September 2014 to June 2015 Brief Description of Research Project

California at Davis, University of

128

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

129

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

130

Silver Creek-Morton Transmission Project: Environmental assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) will in 1989, replace the Silver Creek-Morton 69-kV transmission line with a line of 115-kV construction and, in the late 1990's, add capacitors at Morton Substation. Portions of the new line would be constructed on new right-of-way adjacent to the old 69-kV line and portions would be constructed on the same right-of-way. Construction on adjacent right-of-way would require new right-of-way up to 50 feet wide on one side of the present right-of-way. BPA would then release to private ownership right-of-way up to 50 feet wide on the opposite side, after the old line has been removed. Parts of the new line would be constructed on H-frame wood-pole sructures and parts on single wood-pole structures, depending on land use constraints. 16 refs., 3 figs., 3 tabs.

Not Available

1986-06-01T23:59:59.000Z

131

Record of Decision Issued for the FutureGen 2.0 Project | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy (DOE) has decided to provide financial assistance to the FutureGen Industrial Alliance (the Alliance) for the FutureGen 2.0 Project. DOE will provide approximately 1...

132

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

133

Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview  

Broader source: Energy.gov [DOE]

This study evaluates the future operational and integration impacts of three different 20 percent wind energy penetration scenarios and one 30 percent wind penetration scenario, including a high-level analysis of transmission to deliver the wind energy to load centers, in the study year 2024.

134

Future projections of daily precipitation and its extremes in simulations of 21st century climate change.  

E-Print Network [OSTI]

??The current generation of climate models in the Coupled Model Intercomparison Project Phase 5 (CMIP5) is used to assess the future changes in daily precipitation… (more)

Yin, Lei

2013-01-01T23:59:59.000Z

135

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Broader source: Energy.gov (indexed) [DOE]

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

136

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

137

Secretary Chu Announces Agreement on FutureGen Project in Mattoon, Illinois  

Broader source: Energy.gov (indexed) [DOE]

Agreement on FutureGen Project in Mattoon, Agreement on FutureGen Project in Mattoon, Illinois Secretary Chu Announces Agreement on FutureGen Project in Mattoon, Illinois June 12, 2009 - 1:00pm Addthis Washington, DC - U.S. Secretary of Energy Steven Chu today announced an agreement with the FutureGen Alliance that advances the construction of the first commercial scale, fully integrated, carbon capture and sequestration project in the country in Mattoon, Illinois. "This important step forward for FutureGen reflects this Administration's commitment to rapidly developing carbon capture and sequestration technology as part of a comprehensive plan to create jobs, develop clean energy and reduce climate change pollution." said Energy Secretary Steven Chu. "The FutureGen project holds great promise as a flagship facility to

138

Secretary Chu Announces Agreement on FutureGen Project in Mattoon, IL |  

Broader source: Energy.gov (indexed) [DOE]

Agreement on FutureGen Project in Mattoon, Agreement on FutureGen Project in Mattoon, IL Secretary Chu Announces Agreement on FutureGen Project in Mattoon, IL June 12, 2009 - 12:00am Addthis Washington, D.C. - U.S. Secretary of Energy Steven Chu today announced an agreement with the FutureGen Alliance that advances the construction of the first commercial scale, fully integrated, carbon capture and sequestration project in the country in Mattoon, Illinois. "This important step forward for FutureGen reflects this Administration's commitment to rapidly developing carbon capture and sequestration technology as part of a comprehensive plan to create jobs, develop clean energy and reduce climate change pollution." said Energy Secretary Steven Chu. "The FutureGen project holds great promise as a flagship facility to

139

U.S. and India Sign Historic Agreement on FutureGen Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

Sign Historic Agreement on FutureGen Project Sign Historic Agreement on FutureGen Project U.S. and India Sign Historic Agreement on FutureGen Project April 3, 2006 - 10:02am Addthis India to Participate in World's First Integrated CO2 Sequestration and Hydrogen Production Research Power Plant, FutureGen Initiative NEW DELHI, INDIA - The U.S. Department of Energy (DOE) announced the signing of an agreement with India that makes it the first country to join the U.S. on the government steering committee for the FutureGen Initiative. FutureGen is an initiative to build and operate the world's first coal-based power plant that removes and sequesters carbon dioxide (CO2) while producing electricity and hydrogen. "Adding India to our list of partners is an exciting step for the FutureGen project," Secretary of Energy Samuel W. Bodman said. "The success of

140

EEI/DOE Transmission Capacity Report  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

142

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

143

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

144

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

145

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

146

EIS-0460: FutureGen 2.0 Project, Morgan County, Illinois | Department of  

Broader source: Energy.gov (indexed) [DOE]

60: FutureGen 2.0 Project, Morgan County, Illinois 60: FutureGen 2.0 Project, Morgan County, Illinois EIS-0460: FutureGen 2.0 Project, Morgan County, Illinois Summary This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 project. Under the FutureGen 2.0 project, DOE would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. Public Comment Opportunities None available at this time. Documents Available for Download January 15, 2014 EIS-0460: Record of Decision

147

Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second  

Broader source: Energy.gov (indexed) [DOE]

Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase Carbon Capture and Storage FutureGen 2.0 Project Moves Forward Into Second Phase February 4, 2013 - 7:25pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Following the successful completion of the first phase, the Energy Department today announced the beginning of Phase II of project development with a new cooperative agreement between the FutureGen Industrial Alliance and the Department of Energy for an innovative carbon capture and storage (CCS) project in Illinois. "The Department of Energy is committed to the demonstration of carbon capture and storage technologies. We believe FutureGen 2.0 is an important step in making economic, commercial scale CCS a reality," said U.S.

148

U.S. and India Reach Historic Agreement on FutureGen Project | Department  

Broader source: Energy.gov (indexed) [DOE]

Reach Historic Agreement on FutureGen Project Reach Historic Agreement on FutureGen Project U.S. and India Reach Historic Agreement on FutureGen Project March 2, 2006 - 11:34am Addthis India becomes the first nation to accept U.S. invitation to participate in new clean coal project WASHINGTON, DC - President George W. Bush announced today that India will become the first country to participate on the government steering committee for the U.S. Department of Energy's FutureGen project - an initiative to build and operate the world's first coal-based power plant that removes and sequesters carbon dioxide (CO2) while it produces electricity and hydrogen. As a partner, the Indian government will contribute $10 million to the FutureGen Initiative and Indian companies will also be invited to participate in the private sector segment.

149

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

150

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

151

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

152

Cascadability and reshaping properties of a saturable absorber inserted inside a RZ transmission line for future  

E-Print Network [OSTI]

absorber component cascaded into a 100-km SMF RZ transmission line in order to annihilate the ghost paid to transmission lines working at higher bit-rates, such as 160 Gbit/s [1]. However, many studies Absorber device cascaded inside a 100-km Single Mode Fiber (SMF)- based RZ transmission line cadenced

Paris-Sud XI, Université de

153

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect (OSTI)

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

154

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

155

Port Angeles-Juan de Fuca Transmission Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

This summary includes information regarding the following elements of the draft environmental impact statement (EIS) prepared for the Port Angeles-Juan de Fuca Transmission Project: * purpose and need for action; * Proposed Action and No Action Alternative; and * affected environment, environmental impacts, and mitigation measures. S.1 Purpose and Need for Action Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to

156

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

157

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

158

EIS-0164: Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission (FERC) has prepared the PGT/PG&E and Altamont Natural Gas Pipeline Projects Environmental Impact Statement to satisfy the requirements of the National Environmental Policy Act. This project addresses the need to expand the capacity of the pipeline transmission system to better transfer Canadian natural gas to Southern California and the Pacific Northwest. The U.S. Department of Energy cooperated in the preparation of this statement because Section 19(c) of the Natural Gas Act applies to the Department’s action of authorizing import/export of natural gas, and adopted this statement by the spring of 1992. "

159

Draft Environmental Impact Statement for FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

DOE/EIS-0394D FUTUREGEN PROJECT EIS DOE/EIS-0394D FUTUREGEN PROJECT EIS DRAFT TABLE OF CONTENTS MAY 2007 i TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................ i LIST OF ACRONYMS ................................................................................... LIST OF ACRONYMS - 1 VOLUME I 1. PURPOSE AND NEED FOR AGENCY ACTION ......................................................................1-1 1.1 INTRODUCTION......................................................................................................................1-1 1.2 PROPOSED ACTION ...............................................................................................................1-1 1.3 PURPOSE AND NEED FOR AGENCY ACTION...................................................................1-2

160

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

162

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

163

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

164

Draft Environmental Impact Statement for FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

MAY 2007 i MAY 2007 i SUMMARY TABLE OF CONTENTS TABLE OF CONTENTS............................................................................................................................... i LIST OF ACRONYMS ................................................................................................................................ v SUMMARY.............................................................................................................................................. S-1 S.1 OVERVIEW ............................................................................................................................. S-1 S.1.1 Basis for U.S. Department of Energy Action.................................................................... S-1 S.1.2 Relationship between the U.S. Department of Energy and the FutureGen Alliance

165

Ground vibration measurements for Fermilab future collider projects  

Science Journals Connector (OSTI)

This article presents results of wideband seismic measurements at the Fermilab site, namely, in the tunnel of the Tevatron and on the surface nearby, as well as in two deep tunnels in the Illinois dolomite, thought to be a possible geological environment of the Fermilab future accelerators.

B. Baklakov; T. Bolshakov; A. Chupyra; A. Erokhin; P. Lebedev; V. Parkhomchuk; Sh. Singatulin; J. Lach; V. Shiltsev

1998-07-13T23:59:59.000Z

166

Buildings of the Future Research Project Launch and Virtual Panel Discussion on Building Technology Trends  

Broader source: Energy.gov [DOE]

Learn more about the DOE's Buildings of the Future Project. Buildings will no longer be passive objects that consume resources, but rather active participants engaged in the energy system and our community.

167

Projected Future Changes in Vegetation in Western North America in the Twenty-First Century  

Science Journals Connector (OSTI)

Rapid and broad-scale forest mortality associated with recent droughts, rising temperature, and insect outbreaks has been observed over western North America (NA). Climate models project additional future warming and increasing drought and water ...

Xiaoyan Jiang; Sara A. Rauscher; Todd D. Ringler; David M. Lawrence; A. Park Williams; Craig D. Allen; Allison L. Steiner; D. Michael Cai; Nate G. McDowell

2013-06-01T23:59:59.000Z

168

Modelling the economic and social consequences of drought under future projections of climate change  

E-Print Network [OSTI]

, China, Ethiopia, India, Spain/Portugal and the USA. Future projections of drought magnitude for 2003-2050 were modelled using the integrated assessment model CIAS (Community Integrated Assessment System), for a range of climate and emission scenarios...

Jenkins, Katie L.

2012-01-10T23:59:59.000Z

169

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

170

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

SciTech Connect (OSTI)

The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

2012-06-01T23:59:59.000Z

171

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

172

U.S. and South Korea Sign Agreement on FutureGen Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

South Korea Sign Agreement on FutureGen Project South Korea Sign Agreement on FutureGen Project U.S. and South Korea Sign Agreement on FutureGen Project June 26, 2006 - 2:34pm Addthis Korea to Participate in World's First Integrated Carbon Sequestration and Hydrogen Production Research Power Plant WASHINGTON, DC - U.S. Energy Secretary Samuel W. Bodman and South Korean Minister of Commerce, Industry & Energy, Chung Sye Kyun, today signed an agreement making South Korea the second country, after India, to join the United States in the FutureGen International Partnership. Korea has pledged $10 million to help build and operate the world's first zero-emissions coal-fired power plant and will sit on a government steering committee to oversee this initiative. Once operational, this plant will remove and sequester carbon dioxide while producing electricity and

173

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

174

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

175

Department of Energy Takes Another Step Forward on FutureGen Project in  

Broader source: Energy.gov (indexed) [DOE]

Takes Another Step Forward on FutureGen Takes Another Step Forward on FutureGen Project in Mattoon, Illinois Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, Illinois July 14, 2009 - 1:00pm Addthis Washington, D.C. - The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country. The Department's decision is based on careful consideration of the proposed project's potential environmental impacts, as well as the program goals and objectives. "The carbon capture and sequestration technologies planned for this flagship facility are vitally important to America and the world," said Energy Secretary Steven Chu. "This step forward demonstrates the

176

Department of Energy Takes Another Step Forward on FutureGen Project in  

Broader source: Energy.gov (indexed) [DOE]

Energy Takes Another Step Forward on FutureGen Energy Takes Another Step Forward on FutureGen Project in Mattoon, IL Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, IL July 14, 2009 - 12:00am Addthis Washington, D.C. - The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country. The Department's decision is based on careful consideration of the proposed project's potential environmental impacts, as well as the program goals and objectives. "The carbon capture and sequestration technologies planned for this flagship facility are vitally important to America and the world," said Energy Secretary Steven Chu. "This step forward demonstrates the

177

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

SciTech Connect (OSTI)

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

178

The accuracy of financial report projections of future environmental capital expenditures: a research note  

Science Journals Connector (OSTI)

Financial report environmental disclosure has been widely criticized because the extent of disclosure both varies in response to exposures facing the firm and because it is not an accurate measure of firm environmental performance. This study suggests there are at least two potential problems that need to be addressed before this disclosure can be completely condemned as meaningless. A first potential problem is the earlier studies' focus on broad measures of environmental disclosure. Hidden within those broader measures may be pieces of meaningful information. Second, while the disclosure examined previously may not correspond well with past environmental performance, it, or at least parts of it, may still provide meaningful information for assessing future environmental action. This study attempts to address these shortcomings by examining one specific, but potentially useful, category of environmental disclosure: projections of future spending for pollution abatement and control equipment. Based on 355 sets of projected/actual spending drawn from 10K reports filed with the US's Security and Exchange Commission between 1993 and 2002, inclusive, results suggest that the projections may be more misleading than meaningful. Actual spending was lower than the projected amount for more than 75% of the observations, and the mean projection error (the difference adjusted for the size of the projection) was a negative 16.4%. Analysis of projection errors for a 2-year, rather than a 1-year window revealed a similar distribution. In contrast to the accuracy of the environmental capital expenditure projections, the actual/projection difference for total capital expenditures was very small, suggesting that it is not a difficulty in estimating future capital spending that is driving the error results. The projection errors also did not appear to be a function of changes in company revenues or profitability. Overall, therefore, it appears that, similar to broader measures of corporate environmental disclosure, projections of future spending on environmental control lack value.

Dennis M. Patten

2005-01-01T23:59:59.000Z

179

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

180

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT REVISED OCTOBER 2007 5-2 Figure 5-1. Role of the Analog Site Database and Ancillary Databases in the Approach for Conducting the Risk Assessment FINAL RISK ASSESSMENT REPORT REVISED OCTOBER 2007 5-100 Figure 5-6. Area Within Which H 2 S Released from CO 2 Injection Wells Exceeds Chronic Toxicity Criteria (i.e., 0.0014 ppmv H 2 S) at the Tuscola (IL) Site DOE/EIS-0394 FUTUREGEN PROJECT EIS FINAL SUMMARY NOVEMBER 2007 S-10 Figure S-4. Proposed Mattoon Power Plant and Sequestration Site Figure S-5. Proposed Utility Corridors for the Mattoon Power Plant and Sequestration Site Mattoon Power Plant and Sequestration Site Coles County Shelby County Shelby County Moultrie County C a n a d i a n N a t i o n a l R a i l r o a d Lake Shelbyville Lake Paradise C a n a d i a n N a t

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project  

SciTech Connect (OSTI)

Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

Not Available

1992-10-01T23:59:59.000Z

182

Calculation Method for the Projection of Future Spent Nuclear Fuel Discharges  

SciTech Connect (OSTI)

This report describes the calculation method developed for the projection of future utility spent nuclear fuel (SNF) discharges in regard to their timing, quantity, burnup, and initial enrichment. This projection method complements the utility-supplied RW-859 data on historic discharges and short-term projections of SNF discharges by providing long-term projections that complete the total life cycle of discharges for each of the current U.S. nuclear power reactors. The method was initially developed in mid-1999 to update the SNF discharge projection associated with the 1995 RW-859 utility survey (CRWMS M&O 1996). and was further developed as described in Rev. 00 of this report (CRWMS M&O 2001a). Primary input to the projection of SNF discharges is the utility projection of the next five discharges from each nuclear unit, which is provided via the revised final version of the Energy Information Administration (EIA) 1998 RW-859 utility survey (EIA 2000a). The projection calculation method is implemented via a set of Excel 97 spreadsheets. These calculations provide the interface between receipt of the utility five-discharge projections that are provided in the RW-859 survey, and the delivery of projected life-cycle SNF discharge quantities and characteristics in the format requisite for performing logistics analysis to support design of the Civilian Radioactive Waste Management System (CRWMS). Calculation method improvements described in this report include the addition of a reactor-specific maximum enrichment-based discharge burnup limit. This limit is the consequence of the enrichment limit, currently 5 percent. which is imposed as a Nuclear Regulatory Commission (NRC) license condition on nuclear fuel fabrication plants. In addition, the calculation method now includes the capability for projecting future nuclear plant power upratings, consistent with many such recent plant uprates and the prospect of additional future uprates. Finally. this report summarizes the results of the 2002 Reference SNF Discharge Projection.

B. McLeod

2002-02-28T23:59:59.000Z

183

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

184

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Broader source: Energy.gov [DOE]

This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

185

Toward space solar power: Wireless energy transmission experiments past, present and future  

Science Journals Connector (OSTI)

Solar power is a reality. Today increasing numbers of photovoltaic and other solar-powered installations are in service around the world and in space. These uses range from the primary electric power source for satellites remote site scientific experiments and villages in developing countries to augmenting the commercial electric grid and providing partial power for individual businesses and homeowners in developed countries. In space electricity generated by photovoltaic conversion of solar energy is the mainstay of power for low Earth and geostationary satellite constellations. Still for all its acceptance as a benign and environmentally friendly energy source terrestrial solar power has yet to be seriously considered a viable technology for providing base electrical generating capacity. The obvious reason is sunshine on Earth is too unreliable. In addition to the diurnal and seasonal cycles inclement weather reduces the average daily period and intensity of insolation. However the Sun shines constantly in space. The challenge is to harvest and transmit the energy from space to Earth. The concept of space solar power based on microwave wireless energy transmission was first put forth more than 25 years ago by Dr. Peter Glaser. We review historical experiments in wireless energy transmission which have brought the technology from a laboratory curiosity to its present status. Results from recent experiments and their implications for wireless energy transmission as an enabling technology for space solar power are reviewed. Current developments are discussed along with proposed terrestrial and space experiments.

Frank E. Little; James O. McSpadden; Kai Chang; Nobuyuki Kaya

1998-01-01T23:59:59.000Z

186

Montana-to-Washington Transmission System Upgrade Project - M2W  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an existing BPA transmission line, and the proposed addition of a new series compensation substation along other existing BPA transmission lines. To understand the potential...

187

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

188

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

189

Data Collection for the Bonneville Power Administration Project on Wind Loading of Transmission Conductors  

Science Journals Connector (OSTI)

ABSTRACT The Bonneville Power Administration (BPA) project, “Wind Effects on Conductors for Span Factors” was established to determine the relationship between actual and theoretical wind loads on overhead transmission conductors. This study aims to improve BPA transmission line design methods and criteria as they relate to wind conditions in the Pacific Northwest. For the past seven years, BPA has collected data from seven sites in the Pacific Northwest. Measurements of wind speeds and directions, ambient temperatures and barometric pressures, and conductor swing angles enable engineers to compare measured wind loads on conductors to theoretical values. Impact of such variables as height of conductor, span lengths and conductor diameter are also investigated. Three sites were instrumented with vertically arranged anemometers to measure wind speed as a function of height above ground. This paper covers site determination, instrumentation, data collection, and some site maintenance and operation challenges. The maintenance and manipulation of the very large data base that has been collected is discussed. As data analysis is not yet finished, final results are not included.

H.W. VOLPE

1987-01-01T23:59:59.000Z

190

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Broader source: Energy.gov (indexed) [DOE]

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

191

Liberty-Parker No. 2 230-kV transmission line project, La Paz and Maricopa Counties, Arizona: Environmental assessment  

SciTech Connect (OSTI)

The proposed project was not found to have the potential for significant impact on the human environment. The proposed project is essentially a rebuild of an existing transmission line on an existing right-of-way (ROW) through mostly unpopulated open desert. Analysis of the proposed action and its potential effects on various environmental components showed that the project would not significantly affect climate, air quality, noise levels, topography, geology, or soils. No significant impact would occur to vegetation or wildlife as a result of the project. Visual resources will not be significantly affected, as both the existing Liberty-Parker No. 2 Transmission Line and its parallel sister No. 1 line are already present. Land ownership, land use, and socioeconomics will not be significantly affected. No significant cultural resources will be affected by the proposed project. The lines will be constructed on areas previously surveyed for cultural resources and the site density of this region is known to be very low.

Not Available

1986-09-01T23:59:59.000Z

192

"FutureGen 2.0 Project Draft Environmental Impact Statement Summary"  

Broader source: Energy.gov (indexed) [DOE]

SHEET SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

193

"FutureGen 2.0 Project Final Environmental Impact Statement Summary"  

Broader source: Energy.gov (indexed) [DOE]

COVER SHEET COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Final Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

194

Utility Goals for the Efficiency Resource: Impact of PUC Rulemaking Project No. 39674 on Future Programs  

E-Print Network [OSTI]

Utility Goals for the Efficiency Resource: Impact of PUC Rulemaking Project No. 39674 on Future Programs Amy Martin CATEE Conference October 10, 2012 Overview ? Frontier Associates ? EUMMOT ? Utility Program Overview and Results to Date... Pricing & Resource Planning ? Energy Efficiency & Renewable Energy Programs ? Market Research ? Regulatory Assistance ? Database Solutions ? EUMMOT Administrator Who is EUMMOT? Electric Utility Marketing Managers of Texas (EUMMOT...

Martin, A.

2012-01-01T23:59:59.000Z

195

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

196

NETL: News Release - DOE Selects 5 New Projects to Bolster Nation's Future  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 5, 2000 September 5, 2000 DOE Selects 5 New Projects to Bolster Nation's Future Natural Gas Supplies With "deeper and denser" likely to become the axiom for tomorrow's natural gas producers, the Department of Energy is adding five new projects to its natural gas research program. For three of the projects, the target is natural gas buried under extremely hard rock formations, trapped in gas hydrates on the ocean floor, and in remote regions of the Arctic. The other two explore ways to keep low-volume "stripper" gas wells flowing and to boost the amount of "working gas" stored in salt caverns. The projects are the latest to be selected from a broad-ranging competition conducted for the Energy Department's Office of Fossil Energy by the National Energy Technology Laboratory. The five projects have a total value approaching $7 million, $4.7 million of which will be the federal government's share.

197

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

198

State Transmission Infrastructure Authorities: The Story So Far; December 2007 - December 2008  

SciTech Connect (OSTI)

This report examines the status and future direction of state transmission infrastructure authorities. It summarizes common characteristics, discusses current transmission projects, and outlines common issues the state infrastructure authorities have faced.

Porter, K.; Fink. S.

2008-05-01T23:59:59.000Z

199

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Broader source: Energy.gov (indexed) [DOE]

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

200

Department of Energy Takes Another Step Forward on FutureGen Project in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 14, 2009 July 14, 2009 Department of Energy Takes Another Step Forward on FutureGen Project in Mattoon, IL Record of Decision Issued for First US Commercial Scale Carbon Capture and Storage Project Washington, D.C. - The Department of Energy today issued a National Environmental Policy Act (NEPA) Record of Decision to move forward toward the first commercial scale, fully integrated, carbon capture and sequestration project in the country. The Department's decision is based on careful consideration of the proposed project's potential environmental impacts, as well as the program goals and objectives. MORE INFO Read the full Record of Decision. "The carbon capture and sequestration technologies planned for this flagship facility are vitally important to America and the world," said

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

202

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

203

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

204

"FutureGen 2.0 Project Final Environmental Impact Statement Volume II"  

Broader source: Energy.gov (indexed) [DOE]

APPENDIX F APPENDIX F Cultural Surveys F1 - Phase I - Site Characterization Locale Survey F2 - Phase I - Meredosia Energy Center Survey F3 - Phase I - Bluff Area Pipeline Right-of-Way Segment Survey F4 - Phase I - Soil Gas Monitoring Locations Survey for the Final Environmental Impact Statement FutureGen 2.0 Project Meredosia, Illinois (Morgan County) Note: This appendix was updated for the Final EIS.

205

EA-1982: Parker-Davis Transmission System Programmatic Operations and Maintenance Project; Arizona, California, and Nevada  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

206

Analysis of dc harmonics using the three-pulse model for the intermountain power project HVDC transmission  

SciTech Connect (OSTI)

The harmonic analysis of the dc-side of an HVDC line transmission requires realistic models of the converters, the dc line, and other relevant equipment. These models must include all important paths for harmonic current, and appropriate sources of harmonic voltage generation. The classical converter modeling technique has been demonstrated to be insufficient in field measurements and analysis of the harmonic spectra found on recent HVDC line transmission. For this reason, a new model of the converter bridge which takes into account the major stray capacitances in the converter (the three-pulse model) has been developed, and is described in detail elsewhere. This paper presents comparisons between the classical and three-pulse calculations for the Intermountain Power Project (IPP) HVDC transmission. The calculation results from the three-pulse model agree favorably with the harmonics found in field measurements.

Dickmander, D.L.; Peterson, K.J.

1989-04-01T23:59:59.000Z

207

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

208

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

209

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

210

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

211

COMPARISON OF THREE METHODS TO PROJECT FUTURE BASELINE CARBON EMISSIONS IN TEMPERATE RAINFOREST, CURINANCO, CHILE  

SciTech Connect (OSTI)

Deforestation of temperate rainforests in Chile has decreased the provision of ecosystem services, including watershed protection, biodiversity conservation, and carbon sequestration. Forest conservation can restore those ecosystem services. Greenhouse gas policies that offer financing for the carbon emissions avoided by preventing deforestation require a projection of future baseline carbon emissions for an area if no forest conservation occurs. For a proposed 570 km{sup 2} conservation area in temperate rainforest around the rural community of Curinanco, Chile, we compared three methods to project future baseline carbon emissions: extrapolation from Landsat observations, Geomod, and Forest Restoration Carbon Analysis (FRCA). Analyses of forest inventory and Landsat remote sensing data show 1986-1999 net deforestation of 1900 ha in the analysis area, proceeding at a rate of 0.0003 y{sup -1}. The gross rate of loss of closed natural forest was 0.042 y{sup -1}. In the period 1986-1999, closed natural forest decreased from 20,000 ha to 11,000 ha, with timber companies clearing natural forest to establish plantations of non-native species. Analyses of previous field measurements of species-specific forest biomass, tree allometry, and the carbon content of vegetation show that the dominant native forest type, broadleaf evergreen (bosque siempreverde), contains 370 {+-} 170 t ha{sup -1} carbon, compared to the carbon density of non-native Pinus radiata plantations of 240 {+-} 60 t ha{sup -1}. The 1986-1999 conversion of closed broadleaf evergreen forest to open broadleaf evergreen forest, Pinus radiata plantations, shrublands, grasslands, urban areas, and bare ground decreased the carbon density from 370 {+-} 170 t ha{sup -1} carbon to an average of 100 t ha{sup -1} (maximum 160 t ha{sup -1}, minimum 50 t ha{sup -1}). Consequently, the conversion released 1.1 million t carbon. These analyses of forest inventory and Landsat remote sensing data provided the data to evaluate the three methods to project future baseline carbon emissions. Extrapolation from Landsat change detection uses the observed rate of change to estimate change in the near future. Geomod is a software program that models the geographic distribution of change using a defined rate of change. FRCA is an integrated spatial analysis of forest inventory, biodiversity, and remote sensing that produces estimates of forest biodiversity and forest carbon density, spatial data layers of future probabilities of reforestation and deforestation, and a projection of future baseline forest carbon sequestration and emissions for an ecologically-defined area of analysis. For the period 1999-2012, extrapolation from Landsat change detection estimated a loss of 5000 ha and 520,000 t carbon from closed natural forest; Geomod modeled a loss of 2500 ha and 250 000 t; FRCA projected a loss of 4700 {+-} 100 ha and 480,000 t (maximum 760,000 t, minimum 220,000 t). Concerning labor time, extrapolation for Landsat required 90 actual days or 120 days normalized to Bachelor degree level wages; Geomod required 240 actual days or 310 normalized days; FRCA required 110 actual days or 170 normalized days. Users experienced difficulties with an MS-DOS version of Geomod before turning to the Idrisi version. For organizations with limited time and financing, extrapolation from Landsat change provides a cost-effective method. Organizations with more time and financing could use FRCA, the only method where that calculates the deforestation rate as a dependent variable rather than assuming a deforestation rate as an independent variable. This research indicates that best practices for the projection of baseline carbon emissions include integration of forest inventory and remote sensing tasks from the beginning of the analysis, definition of an analysis area using ecological characteristics, use of standard and widely used geographic information systems (GIS) software applications, and the use of species-specific allometric equations and wood densities developed for local species.

Patrick Gonzalez; Antonio Lara; Jorge Gayoso; Eduardo Neira; Patricio Romero; Leonardo Sotomayor

2005-07-14T23:59:59.000Z

212

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

213

Assessment of Drought due to Historic Climate Variability and Projected Future Climate Change in the Midwestern United States  

Science Journals Connector (OSTI)

Understanding the occurrence and variability of drought events in historic and projected future climate is essential to managing natural resources and setting policy. The Midwest region is a key contributor in corn and soybean production, and the ...

Vimal Mishra; Keith A. Cherkauer; Shraddhanand Shukla

2010-02-01T23:59:59.000Z

214

Transportation Energy Futures: Project Overview and Findings (Presentation), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transportation currently accounts for 71% of total U.S. petroleum use and 33% of the Transportation currently accounts for 71% of total U.S. petroleum use and 33% of the nation's total carbon emissions. Energy-efficient transportation strategies and renewable fuels have the potential to simultaneously reduce petroleum consumption and greenhouse gas (GHG) emissions. The U.S. Department of Energy's (DOE) Transportation Energy Futures (TEF) project examines how a combination of multiple strategies could achieve deep reductions in petroleum use and GHG emissions. The project's primary objective is to help inform domestic decisions about transportation energy strategies, priorities, and investments, with an emphasis on underexplored opportunities related to energy efficiency

215

Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider  

E-Print Network [OSTI]

High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

Lebrun, Philippe

2010-01-01T23:59:59.000Z

216

Status and Future Perspectives of the HIE-Isolde Project at CERN  

E-Print Network [OSTI]

The High Intensity and Energy (HIE)-ISOLDE project aims at several important upgrades of the present ISOLDE radioactive beam facility at CERN. The main focus lies in the energy upgrade of the post-accelerated radionuclide beams from 3 MeV/u up to 10 MeV/u through the addition of superconducting cavities. This will open the possibility of many new types of experiments including transfer reactions throughout the nuclear chart. The first stage of this upgrade involves the design, construction, installation and commissioning of two high-? cryomodules downstream of REX-ISOLDE, the existing post-accelerator. Each cryomodule houses five high-? superconducting cavities and one superconducting solenoid. Prototypes of the Nb-sputtered Quarter Wave Resonators (QWRs) cavities for the new superconducting linear accelerator have been manufactured and are undergoing RF cold tests. The project also includes a design study of improved production targets to accommodate to the future increase of proton intensity delivered by ...

Kadi, Y; Blumenfeld, Y; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Venturini Delsolaro, W; Voulot, D; Williams, L R

2012-01-01T23:59:59.000Z

217

Modelling the impacts of projected future climate change on water resources in north-west England Hydrol. Earth Syst. Sci., 11(3), 11151126, 2007  

E-Print Network [OSTI]

Modelling the impacts of projected future climate change on water resources in north-west England of projected future climate change on water resources in north-west England H.J. Fowler1 , C.G. Kilsby1 and J (Fowler and Kilsby, 2002) and future projections from Global Climate Models (GCMs) suggest that winters

Paris-Sud XI, Université de

218

Research projects for 2014 Natural Products Chemistry / Sustainable Chemicals for the Future Prof. Chris Rayner Prof. Chris Rayner  

E-Print Network [OSTI]

of the original textiles. We are also developing a range of natural dyes as new platform chemicals, where we canResearch projects for 2014 ­ Natural Products Chemistry / Sustainable Chemicals for the Future Prof://www.chem.leeds.ac.uk/People/Rayner.html Natural Products Chemistry / Sustainable Chemicals for the Future The large majority of chemically derived

Rzepa, Henry S.

219

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

220

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

222

EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

223

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

224

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect (OSTI)

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

225

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

226

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

227

EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

228

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

229

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

line between Eugene and Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson...

230

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

231

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

stakeholders in transmission-line route planning and sitingan “optimal” transmission line route-finding tool. This tool

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

232

RESTRUCTURING OF THE JORDANIAN UTILITY SECTOR AND ITS ASSOCIATED GHG EMISSIONS: A FUTURE PROJECTION  

Science Journals Connector (OSTI)

As a small non?oil producing Middle Eastern country of a young and growing population and rapid urbanization Jordan like many countries all over the world was and is still facing the problem of meeting the rapidly increasing demand of electricity. The main objective of this study is to review many current aspects of the Jordanian electricity sector including electricity generation electricity consumption energy related emissions and future possibilities based on time series forecasting through the term of the Clean Development Mechanism (CDM) arrangement under the Kyoto Protocol in which the Hashemite Kingdom of Jordan had signed lately which allows industrialized countries with a greenhouse gas reduction commitment to invest in projects that reduce emissions in developing countries as an alternative to more expensive emission reductions in their own countries. Several scenarios are proposed in this study based on projected electricity consumption data until year 2028. Without attempting to replace the currently existing fossil?fuel based power plant technologies in Jordan by clean ones electricity consumption and associated GHG emissions are predicted to rise by 138% by year 2028; however if new clean technologies are adopted gradually over the same period electricity consumption as well as GHG emissions will ascend at a lower rate.

Rami Hikmat Fouad; Ahmed Al?Ghandoor; Mohammad Al?Khateeb; Hamada Bata

2008-01-01T23:59:59.000Z

233

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

234

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

235

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

236

Validation of phasor calculations in the Macrodyne PMU for California-Oregon Transmission Project tests of March 1993  

SciTech Connect (OSTI)

Faults applied during March 1993 commissioning tests for the California-Oregon Transmission Project produced 14 Hz transient oscillations that were conspicuous in BPA`s enhanced transducers at Malin, and in PG and E`s Dynamic System Monitor at Table Mountain. Prony analysis of high speed fault data provided a detailed model for the underlying network resonance signal, and a basis for validating transient performance of a Macrodyne Phasor Measurement Unit (PMU) at the test site. This instrument, which is closely associated with EPRI`s FACTS project, provides useful insight into emerging technology for high speed digital transducers. The phasor calculations are found to be of very high quality, but filtering enhancements are recommended for broadband applications.

Hauer, J.F. [Pacific Northwest Labs., Richland, WA (United States)] [Pacific Northwest Labs., Richland, WA (United States)

1996-07-01T23:59:59.000Z

237

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

238

EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

239

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

240

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Design studies for the Mead-Phoenix 500 kV AC transmission project  

SciTech Connect (OSTI)

The Mead-Phoenix 500 kV ac line is 243 miles long and runs parallel to the existing Mead-Liberty 345 kV line. This line is planned for 70% series and 70% shunt compensation; it also incorporates the first application of a 50 kV phase shifting transformer that enables a 1,300 MW transmission capacity. This paper presents the design studies that were undertaken in arriving at the equipment ratings and insulation levels that lead to the equipment specifications. The shunt reactor switching requirements utilizing MOV across the breaker, line switching with line connected arresters and the breaker transient recovery voltage are also dealt with in the paper.

Thallam, R.S.; Lundquist, T.G.; Gerlach, D.W. [Salt River Project, Phoenix, AZ (United States)] [Salt River Project, Phoenix, AZ (United States); Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada)] [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)] [Arizona Public Service Co., Phoenix, AZ (United States)

1995-10-01T23:59:59.000Z

242

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

243

Tropical coasts are highly vulnerable to climatic pressures, the future impacts of which are projected to propagate  

E-Print Network [OSTI]

Tropical coasts are highly vulnerable to climatic pressures, the future impacts of which are projected to propagate through the natural and human components of coastal systems. One single event (e the resilience of the whole system. Risks related to climate change are frequently examined in isolation through

Boyer, Edmond

244

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Broader source: Energy.gov (indexed) [DOE]

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

245

Modeling the Impacts of Future Climate Change on Irrigation over China: Sensitivity to Adjusted Projections  

Science Journals Connector (OSTI)

Because of the limitations of coarse-resolution general circulation models (GCMs), delta change (DC) methods are generally used to derive scenarios of future climate as inputs into impact models. In this paper, the impact of future climate change ...

Guoyong Leng; Qiuhong Tang

2014-10-01T23:59:59.000Z

246

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Broader source: Energy.gov (indexed) [DOE]

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

247

DOE/EIS-0325; Environmental Impact Statement for Schultz-Hanford Area Transmission Line Project (02/2002)  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Summary Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Summary S-1 Summary In this Summary: * The Purposes and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the Draft Environmental

248

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

249

Record of Decision for the Los Banos-Gates Transmission Project (DOE/EIS-0128-SA-01)  

Broader source: Energy.gov (indexed) [DOE]

99 99 Federal Register / Vol. 66, No. 245 / Thursday, December 20, 2001 / Notices A copy of any motion to intervene must also be served upon the representative of the RAWA specified in item h, above. p. Agency Comments-Federal, state, and local agencies are invited to file comments on the subject application for surrender of exemption. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representative listed in item h, above. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 01-31311 Filed 12-19-01; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Los Banos-Gates Transmission Project AGENCY: Western Area Power

250

Projecting future changes in distributions of pelagic fish species of Northeast Pacific shelf seas  

E-Print Network [OSTI]

characteristics. Using projected ocean condition changes from three different Earth System Models, we simulated

Pauly, Daniel

251

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

252

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

253

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS–0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

254

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network [OSTI]

that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190...

Kim, Yoo Hyun

2012-07-16T23:59:59.000Z

255

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

SciTech Connect (OSTI)

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

256

Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature MarketProjected Biomass Utilization for Fuels and Power in a Mature Market  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FUELS Projected Biomass Utilization for Fuels and Power in a Mature Market TRANSPORTATION ENERGY FUTURES SERIES: Projected Biomass Utilization for Fuels and Power in a Mature Market A Study Sponsored by U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 2013 Prepared by NATIONAL RENEWABLE ENERGY LABORATORY Golden, Colorado 80401-3305 managed by Alliance for Sustainable Energy, LLC for the U.S. DEPARTMENT OF ENERGY under contract DC-A36-08GO28308 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or

257

Baseline and Projected Future Carbon Storage and Greenhouse-Gas Fluxes in Ecosystems of the  

E-Print Network [OSTI]

- covered foothills in the background. (Photograph by Benjamin M. Sleeter.) #12;Baseline and Projected LaPoint, Patrick Miles, Ronald Piva, Jeffery Turner, and Brad Smith of the USDA Forest Service

Fleskes, Joe

258

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

259

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

California Energy Commission Transmission Planning Analysis92, No. 5, Dec. CEC (California Energy Commission). 2004.of MCPs. California Energy Commission. Nov. CERTS PIER

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

260

Drawing from past experience to improve the management of future underground projects  

SciTech Connect (OSTI)

The high-energy physics community is currently developing plans to build underground facilities as part of its continuing investigation into the fundamental nature of matter. The tunnels and caverns are being designed to house a new generation of particle accelerators and detectors. For these projects, the cost of constructing the underground facility will constitute a major portion of the told capital cost and project viability can be greatly enhanced by paying careful attention to design and construction practices. A review of recently completed underground physics facilities and related literature has been undertaken to identify some management principles that have proven successful in underground practice. Projects reviewed were constructed in the United States of America and Europe using both Design-Build and more traditional Engineer-Procure-Construct contract formats. Although the physics projects reviewed tend to place relatively strict tolerances on alignment, stability and dryness, their overall requirements are similar to those of other tunnels and it is hoped that some of the principles promoted in this paper will be of value to the owner of any underground project.

Laughton, Christopher; /Fermilab

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Department of Energy Takes Another Step Forward on FutureGen Project in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

August 5, 2009 August 5, 2009 President Obama Announces $2.4 Billion in Grants to Accelerate the Manufacturing and Deployment of the Next Generation of U.S. Batteries and Electric Vehicles Recovery Act will fund 48 new advanced battery and electric drive components manufacturing and electric drive vehicle deployment projects in over 20 states Elkhart, Indiana - Further accelerating the manufacturing and deployment of electric vehicles, batteries, and components here in America, and creating tens of thousands of new jobs, President Obama today announced 48 new advanced battery and electric drive projects that will receive $2.4 billion in funding under the American Recovery and Reinvestment Act. These projects, selected through a highly competitive process by the Department of Energy, will accelerate the development of U.S. manufacturing capacity for batteries and electric drive components as well as the deployment of electric drive vehicles, helping to establish American leadership in creating the next generation of advanced vehicles.

262

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

263

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

264

Future Changes in the Western North Pacific Tropical Cyclone Activity Projected by a Multidecadal Simulation with a 16-km Global Atmospheric GCM  

Science Journals Connector (OSTI)

How tropical cyclone (TC) activity in the northwestern Pacific might change in a future climate is assessed using multidecadal Atmospheric Model Intercomparison Project (AMIP)-style and time-slice simulations with the ECMWF Integrated Forecast ...

Julia V. Manganello; Kevin I. Hodges; Brandt Dirmeyer; James L. Kinter III; Benjamin A. Cash; Lawrence Marx; Thomas Jung; Deepthi Achuthavarier; Jennifer M. Adams; Eric L. Altshuler; Bohua Huang; Emilia K. Jin; Peter Towers; Nils Wedi

2014-10-01T23:59:59.000Z

265

The DOE Wide Area Measurement System (WAMS) Project: Demonstration of dynamic information technology for the future power system  

SciTech Connect (OSTI)

In 1989 the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands, in an environment where increased competition, a wider range of services and vendors, and much narrower operating margins all contribute to increased system efficiencies and capacity. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment--the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI). The WAMS project also brings added focus and resources to the evolving Western System Dynamic Information Network, or WesDINet. This is a collective response of the Western Systems Coordinating Council (WSCC) member utilities to their shared needs for direct information about power system characteristics, model fidelity, and operational performance. The WAMS project is a key source of the technology and backbone communications needed to make WesDINet a well integrated, cost effective enterprise network demonstrating the role of dynamic information technology in the emerging utility environment.

Mittelstadt, W.A. [USDOE Bonneville Power Administration, Portland, OR (United States); Krause, P.E.; Wilson, R.E. [USDOE Western Area Power Administration, Golden, CO (United States); Overholt, P.N. [USDOE, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

1996-07-01T23:59:59.000Z

266

Dimensions of global population projections: what do we know about future population trends and structures?  

Science Journals Connector (OSTI)

...categories have become the standard) as well as by mean...International statistical review (Lutz Goldstein 2004...example, if there is a plan to build a new primary...definitions given as a standard for all the driver reviews. These projections...

2010-01-01T23:59:59.000Z

267

The DOE Wide Area Measurement System (WAMS) Project -- Demonstration of dynamic information technology for the future power system  

SciTech Connect (OSTI)

In 1989 the Bonneville Power Administration (BPA) and the Western Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands in an environment characterized by increased competition, a wider range of services and vendors, and much narrower operating margins. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI).

Mittelstadt, W.A. [Bonneville Power Administration (United States); Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States); Krause, P.E.; Wilson, R.E. [Western Power Administration (United States); Overholt, P.N. [USDOE (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

1995-12-31T23:59:59.000Z

268

Present status and future prospect of Fast Ignition Realization Experiment (FIREX) Project at ILE, Osaka  

SciTech Connect (OSTI)

Thermonuclear ignition and subsequent burn are key physics for achieving laser fusion. In fast ignition, a highly compressed fusion fuel generated with multiple ns-laser beams is rapidly heated with a large energy, ps-laser pulse in prior to core disassembly. This scheme has a high potential to achieve ignition and burn since driver energy required for high fusion gain is predicted to be about one tenth of that needed for the central ignition scheme. In Japan, Fast Ignition Realization Experiment (FIREX) project has been started to clarify the physics of energy transport and deposition in the core plasma and to demonstrate fuel temperature of above 5 keV. After the success, FIREX-I will be followed by the second phase of the project (FIREX-II) to demonstrate ignition and burn. LFEX laser, designed to deliver a laser pulse of 10 kJ in 10 ps, are operational and the first phase of FIREX experiments has been stated. A new target is proposed to attain dense compression of fuel and improve laser-core coupling efficiency by adopting double-cone structure, a low-density inner liner, low-Z outer coating, and Br-doped fuel shell. In this paper, present status and near term prospects of the FIREX-I project will be reported together with activities on target designing, laser development, and plasma diagnostics.

Nishimura, H.; Azechi, H.; Mima, K.; Fujimoto, Y.; Fujioka, S.; Homma, H.; Jitsuno, T.; Johzaki, T.; Koga, M.; Kawanaka, J.; Kawasaki, T.; Miyanaga, N.; Murakami, H.; Murakami, M.; Nagatomo, H.; Morio, N.; Nagai, K.; Nakai, M.; Nakamura, T.; Nakazato, T. [Institute of Laser Engineering, Osaka Univ., 2-6 Yamada-oka, Suita, Osaka 565-0871 (Japan)

2010-02-02T23:59:59.000Z

269

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

270

Estimating the effect of future oil prices on petroleum engineering project investment yardsticks.  

E-Print Network [OSTI]

did not reflect the true volatility in crude oil prices. The name posted oil price was derived from a sheet that was posted in a producing field. The WTI price data were collected from Energy Information Administration (EIA) website25. EIA... projects; we correlated historical expenses data with oil price. Figs. 3.3 and 3.4 are graphs of the production and drilling costs correlations with oil price. The historical oilfield drilling and production data was taken from EIA website and the Energy...

Mendjoge, Ashish V

2004-09-30T23:59:59.000Z

271

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

272

NREL: Energy Analysis - Renewable Electricity Futures Study  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Renewable Electricity Futures Study Renewable Electricity Futures Study RE Futures Visualizations These visualizations are based on RE Futures modeling and represent the transformation of the U.S. electric system to a high renewable system from 2010 to 2050 and the hourly operation and transmission flow of that system in 2050. Transformation of the Electric Sector (Compare to Baseline Projections) Screen capture of a dynamic map that is animated to display the transformation of the electric sector in 2010 through 2050 Hourly Operation in 2050 (Compare to Baseline Projections) Screen capture of a dynamic map that is animated to display hourly operation in 2010 through 2050 Power Flow in 2050 (Compare to Baseline Projections) Screen capture of a dynamic map that is animated to display power flow in 2010 through 2050

273

Living a Sustainable Future  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Living a Sustainable Future Living a Sustainable Future August 1, 2013 Biomass to fuel project The Laboratory's biomass team is working to solve the energy crisis through...

274

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

275

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

276

Amended Notice of Intent for the Northern Pass Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

277

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

278

Libraries of the Future (LOFT): Executive Summary CSU LA Basin Pilot Project For Developing Cost-Effective Library Services and Resources for  

E-Print Network [OSTI]

: · Print collection analysis and management strategies · Re- Design of library facilities and space space for new library services and learning areas, and can reduce overall library expenditures. CourantPage 1 Libraries of the Future (LOFT): Executive Summary CSU LA Basin Pilot Project For Developing

Su, Xiao

279

Future Climate Engineering Solutions  

E-Print Network [OSTI]

Engineering Associations from around the world are part of the project `Future Climate - Engineering Solu- tions'. Within the project the participating associations have been developing national climate plansFuture Climate Engineering Solutions Joint report 13 engineering participating engeneering

280

EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project.

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

282

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

283

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

284

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

285

RECIPIENT:Princeton Power Systems STATE: NJ PROJECT Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage  

Broader source: Energy.gov (indexed) [DOE]

Princeton Power Systems Princeton Power Systems STATE: NJ PROJECT Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000293 DE-EE0003640 GFO-000364~001 GOO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, ~terature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

286

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Broader source: Energy.gov (indexed) [DOE]

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

287

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Energy Savers [EERE]

& Publications Wind Integration, Transmission, and Resource Assessment and Characterization Projects Offshore Wind Projects Testing, Manufacturing, and Component Development...

288

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

289

Limited exemption to hydroelectric licensing provisions for transmission facilities associated with the El Vado Hydroelectric Project. Introduced in the Senate, One Hundred Fourth Congress, First Session, April 27, 1995  

SciTech Connect (OSTI)

The report addresses bill S. 522 which is to provide for a limited exemption to the hydroelectric licensing provisions of part I of the Federal Power Act for certain transmission facilities associated with the El Vado Hydroelectric Project in New Mexico. The bill proposes to permit a limited exemption for a 12 mile transmission line to Rio Arriba County, New Mexico. The project was licensed by the Federal Energy Regulatory Commission. The background and need for the exemption is presented. Statements of government officials are included.

NONE

1995-12-31T23:59:59.000Z

290

A study of the future water requirements of the state of Texas and the projected plan to meet them as presented by the United States Study Commission - Texas  

E-Print Network [OSTI]

that my education could be continued. G. W. August, 1963 111 CONTENTS Page List of Tables List of Plates Chapter vi I. Introduction II. Water Resources I II. Water Requirements IV. The Water Development Plan 15 31 34 V. Views and Comments... University in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION Sanuary, 1964 Major Subject Business Adzninistration A STUDY OF THE FUTURE WATER REQUIREMENTS. OF THE STATE OF TEXAS AND THE PROJECTED PLAN TO MEET...

Wortham, Gene Rye

1964-01-01T23:59:59.000Z

291

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

E-Print Network [OSTI]

wind resource where projects are located, transmission, grid integration,wind resource in which projects are located, as well as development, transmission, integration,

Wiser, Ryan

2013-01-01T23:59:59.000Z

292

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

293

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

294

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota  

Broader source: Energy.gov [DOE]

USDA Rural Utilities Service prepared an EIS that evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE’s Western Area Power Administration, a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western’s transmission system.

295

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

296

Future Air Pollution in Europe from a Multi-physics Ensemble of Climate Change-Air Quality Projections  

Science Journals Connector (OSTI)

This work conducts a multi-physics ensemble of air quality projections in order to elucidate the spreads and uncertainties behind the election of the physical parameterizations in the regional climate models. ...

Pedro Jiménez-Guerrero; Sonia Jerez…

2014-01-01T23:59:59.000Z

297

Community petascale project for accelerator science and simulation: Advancing computational science for future accelerators and accelerator technologies  

E-Print Network [OSTI]

al. 2005 Impact of SciDAC on accelerator projects across the171; Spentzouris P 2006 Accelerator modeling under SciDAC:of next-generation accelerator design, analysis, and

Spentzouris, Panagiotis

2008-01-01T23:59:59.000Z

298

Projected climate regime shift under future global warming from multi-model, multi-scenario CMIP5 simulations  

Science Journals Connector (OSTI)

Abstract This study examined shifts in climate regimes over the global land area using the Köppen–Trewartha (K–T) climate classification by analyzing observations during 1900–2010, and simulations during 1900–2100 from twenty global climate models participating in Phase 5 of the Coupled Model Inter-comparison Project (CMIP5). Under the Intergovernmental Panel on Climate Change Representative Concentration Pathways 8.5 (RCP8.5) scenario, the models projected a 3°–10 °C warming in annual temperature over the global land area by the end of the twenty-first century, with strong (moderate) warming in the high (middle) latitudes of the Northern Hemisphere and weaker warming in the tropics and the Southern Hemisphere. The projected changes in precipitation vary considerably in space and present greater uncertainties among the models. Overall, the models are consistent in projecting increasing precipitation over the high-latitude of the Northern Hemisphere, and reduced precipitation in the Mediterranean, southwestern North America, northern and southern Africa and Australia. Based on the projected changes in temperature and precipitation, the K–T climate types would shift toward warmer and drier climate types from the current climate distribution. Regions of temperate, tropical and dry climate types are projected to expand, while regions of polar, sub-polar and subtropical climate types are projected to contract. The magnitudes of the projected changes are stronger in the RCP8.5 scenario than the low emission scenario RCP4.5. On average, the climate types in 31.4% and 46.3% of the global land area are projected to change by the end of the twenty-first century under RCP4.5 and RCP8.5 scenarios, respectively. Further analysis suggests that changes in precipitation played a slightly more important role in causing shifts of climate type during the twentieth century. However, the projected changes in temperature play an increasingly important role and dominate shifts in climate type when the warming becomes more pronounced in the twenty-first century.

Song Feng; Qi Hu; Wei Huang; Chang-Hoi Ho; Ruopu Li; Zhenghong Tang

2014-01-01T23:59:59.000Z

299

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

300

Earth'future climate  

Science Journals Connector (OSTI)

...their visions of the future I. Astronomy and Earth sciences compiled by J. M. T. Thompson Earth'future climate Mark A. Saunders 1 1 Benfield...provide informed scientific projections for Earth's climate into the next millennium. This...

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

302

Microsoft PowerPoint - CF-LM M2W Project Updates_final [Compatibility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Upgrade Project (M2W Project) Project description: * Upgrade existing BPA Transmission system West of Garrison substation. Project includes upgrades at five...

303

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

304

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

305

Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

N /A

2000-03-20T23:59:59.000Z

306

Projecting the range of potential future climate change as an aid in the assessment of the effectiveness of the Hanford Site Permanent Isolation Barrier  

SciTech Connect (OSTI)

The Hanford Site Permanent Isolation Barrier Development Program was organized to develop an in-place disposal capability for low-level nuclear waste for the US Department of Energy at the Hanford Site in south-eastern Washington. Layered earthen and engineered barriers are being developed by Westinghouse Hanford Company and the Pacific Northwest Laboratory that will function in what is presently a semiarid environment (annual precipitation 150 mm) for at least 1,000 yr by limiting the infiltration of water through the waste. The Long-Term Climate Change Task is one of several key barrier tasks. Based on the recommendation of a panel of internationally recognized climate and modeling experts, climatic data for this task is being acquired in a step-wise and multi-disciplinary manner. The specific research strategy includes literature review and specialized studies to obtain pollen-derived climatic reconstruction, documented historic weather patterns, and Global Circulation Model output of potential future climate changes related to both the greenhouse effect and the cycling into the next ice age. The specific goals of the task are to: (1) obtain defensible probabilistic projections of the long-term climate variability in the Hanford Site region at many different time scales into the future, (2) develop several test case climate scenarios that bracket the range of potential future climate, and (3) use the climate scenarios both to test and to model protective barrier performance.

Petersen, K.L.

1993-10-01T23:59:59.000Z

307

Multi-model Mean Nitrogen and Sulfur Deposition from the Atmospheric Chemistry and Climate Model Intercomparison Project (ACCMIP): Evaluation of Historical and Projected Future Changes  

SciTech Connect (OSTI)

We present multi-model global datasets of nitrogen and sulfate deposition covering time periods from 1850 to 2100, calculated within the Atmospheric Chemistry and Climate Model Intercomparison Project (ACCMIP). The computed deposition fluxes are compared to surface wet deposition and ice-core measurements. We use a new dataset of wet deposition for 2000-2002 based on critical assessment of the quality of existing regional network data. We show that for present-day (year 2000 ACCMIP time-slice), the ACCMIP results perform similarly to previously published multi-model assessments. The analysis of changes between 1980 and 2000 indicates significant differences between model and measurements over the United States, but less so over Europe. This difference points towards misrepresentation of 1980 NH3 emissions over North America. Based on ice-core records, the 1850 deposition fluxes agree well with Greenland ice cores but the change between 1850 and 2000 seems to be overestimated in the Northern Hemisphere for both nitrogen and sulfur species. Using the Representative Concentration Pathways to define the projected climate and atmospheric chemistry related emissions and concentrations, we find large regional nitrogen deposition increases in 2100 in Latin America, Africa and parts of Asia under some of the scenarios considered. Increases in South Asia are especially large, and are seen in all scenarios, with 2100 values more than double 2000 in some scenarios and reaching >1300 mgN/m2/yr averaged over regional to continental scale regions in RCP 2.6 and 8.5, ~30-50% larger than the values in any region currently (2000). Despite known issues, the new ACCMIP deposition dataset provides novel, consistent and evaluated global gridded deposition fields for use in a wide range of climate and ecological studies.

Lamarque, Jean-Francois; Dentener, Frank; McConnell, J.R.; Ro, C-U; Shaw, Mark; Vet, Robert; Bergmann, D.; Cameron-Smith, Philip; Dalsoren, S.; Doherty, R.; Faluvegi, G.; Ghan, Steven J.; Josse, B.; Lee, Y. H.; MacKenzie, I. A.; Plummer, David; Shindell, Drew; Skeie, R. B.; Stevenson, D. S.; Strode, S.; Zeng, G.; Curran, M.; Dahl-Jensen, D.; Das, S.; Fritzsche, D.; Nolan, M.

2013-08-20T23:59:59.000Z

308

Mobility chains analysis of technologies for passenger cars and light duty vehicles fueled with biofuels : application of the Greet model to project the role of biomass in America's energy future (RBAEF) project.  

SciTech Connect (OSTI)

The Role of Biomass in America's Energy Future (RBAEF) is a multi-institution, multiple-sponsor research project. The primary focus of the project is to analyze and assess the potential of transportation fuels derived from cellulosic biomass in the years 2015 to 2030. For this project, researchers at Dartmouth College and Princeton University designed and simulated an advanced fermentation process to produce fuel ethanol/protein, a thermochemical process to produce Fischer-Tropsch diesel (FTD) and dimethyl ether (DME), and a combined heat and power plant to co-produce steam and electricity using the ASPEN Plus{trademark} model. With support from the U.S. Department of Energy (DOE), Argonne National Laboratory (ANL) conducted, for the RBAEF project, a mobility chains or well-to-wheels (WTW) analysis using the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed at ANL. The mobility chains analysis was intended to estimate the energy consumption and emissions associated with the use of different production biofuels in light-duty vehicle technologies.

Wu, M.; Wu, Y.; Wang, M; Energy Systems

2008-01-31T23:59:59.000Z

309

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

310

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

311

The ASTRI Project: prototype status and future plans for a Cherenkov dual-mirror small-telescope array  

E-Print Network [OSTI]

ASTRI ("Astrofisica con Specchi a Tecnologia Replicante Italiana") is a flagship project of the Italian Ministry of Education, University and Research. Within this framework, INAF is currently developing a wide field of view (9.6 degrees in diameter) end-to-end prototype of the CTA small-size telescope (SST), devoted to the investigation of the energy range from a fraction of TeV up to tens of TeVs, and scheduled to start data acquisition in 2014. For the first time, a dual-mirror Schwarzschild-Couder optical design will be adopted on a Cherenkov telescope, in order to obtain a compact optical configuration. A second challenging, but innovative technical solution consists of a modular focal surface camera based on Silicon photo-multipliers with a logical pixel size of 6.2mm x 6.2mm. Here we describe the current status of the project, the expected performance, and its possible evolution in terms of an SST mini-array. This CTA-SST precursor, composed of a few SSTs and developed in collaboration with CTA interna...

Vercellone, S; Maccarone, M C; Di Pierro, F; Vallania, P; Bonnoli, G; Canestrari, R; Pareschi, G; Tosti, G

2013-01-01T23:59:59.000Z

312

The ASTRI project: Prototype status and future plans for a Cherenkov dual-mirror small-telescope array  

Science Journals Connector (OSTI)

ASTRI ("Astrofisica con Specchi a Tecnologia Replicante Italiana") is a flagship project of the Italian Ministry of Education University and Research. Within this framework INAF is currently developing a wide field of view (9.6° in diameter) end-to-end prototype of the CTA smallsize telescope (SST) devoted to the investigation of the energy range from a fraction of TeV up to (possibly) hundreds of TeV and scheduled to start data acquisition in 2014. For the first time a dualmirror Schwarzschild-Couder optical design will be adopted on a Cherenkov telescope in order to obtain a compact (F? = 0.5) optical configuration. A second challenging but innovative technical solution consists of a focal plane camera based on Silicon photo-multipliers with a logical pixel size of 0.17° (6.2mm × 6.2mm). We will describe the current status of the project the results obtained so far the expected performance and its possible evolution in terms of a SST mini-array (composed of 5-7 SSTs and developed in collaboration with CTA international partners) which could peruse not only the adopted technological solutions but also address a few scientific test cases.

S. Vercellone; ASTRI Collaboration

2012-01-01T23:59:59.000Z

313

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

314

Community Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies  

SciTech Connect (OSTI)

The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors. ComPASS is in the first year of executing its plan to develop the next-generation HPC accelerator modeling tools. ComPASS aims to develop an integrated simulation environment that will utilize existing and new accelerator physics modules with petascale capabilities, by employing modern computing and solver technologies. The ComPASS vision is to deliver to accelerator scientists a virtual accelerator and virtual prototyping modeling environment, with the necessary multiphysics, multiscale capabilities. The plan for this development includes delivering accelerator modeling applications appropriate for each stage of the ComPASS software evolution. Such applications are already being used to address challenging problems in accelerator design and optimization. The ComPASS organization for software development and applications accounts for the natural domain areas (beam dynamics, electromagnetics, and advanced acceleration), and all areas depend on the enabling technologies activities, such as solvers and component technology, to deliver the desired performance and integrated simulation environment. The ComPASS applications focus on computationally challenging problems important for design or performance optimization to all major HEP, NP, and BES accelerator facilities. With the cost and complexity of particle accelerators rising, the use of computation to optimize their designs and find improved operating regimes becomes essential, potentially leading to significant cost savings with modest investment.

Spentzouris, P.; /Fermilab; Cary, J.; /Tech-X, Boulder; McInnes, L.C.; /Argonne; Mori, W.; /UCLA; Ng, C.; /SLAC; Ng, E.; Ryne, R.; /LBL, Berkeley

2011-11-14T23:59:59.000Z

315

Getting the Crop to Market: Siting and Permitting Transmission Lines on Buffalo Ridge, Minnesota  

Science Journals Connector (OSTI)

Publisher Summary The rapid development of wind technology in southwest Minnesota has prompted the need to improve the transmission system in this area. The Minnesota Public Utilities Commission approved four major transmission line projects in 2003 to meet this need, including an 87-mile 345 kV transmission line. Northern States Power Company, d/b/a Xcel Energy, currently is involved in the State siting process with the projects and has been gathering public and agency input. Gathering the information early in the process has proven to be invaluable in deciding route locations and permitting strategies. In addition, public reception for the projects has been primarily positive since these facilities will allow additional wind generation to be developed in the area. This chapter describes the Xcel Energy projects, public reactions to the project, and the routing and siting issues, including some unique to these projects. Xcel Energy will highlight the primary lessons learned that can be used in future projects for routing transmission lines.

Michelle F. Bissonnette; Angela G.L. Piner; Pamela J. Rasmussen

2008-01-01T23:59:59.000Z

316

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

317

DOE/EIS-0378-SA-01: Supplement Analysis for the Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement (DOE/EIS-0378-SA-01) (02/05/08)  

Broader source: Energy.gov (indexed) [DOE]

February 5, 2008 February 5, 2008 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Port Angeles-Juan de Fuca Transmssion Project Final Environmental Impact Statement (DOE/EIS-0378/SA-01) Mark Korsness Project Manager - TEP TPP-3 Proposed Action: Relocation of the marine exit hole for the horizontal directionally drilled (HDD) hole that would be drilled under the Proposed Action. Proposed by: Sea Breeze Olympic Converter LP (Sea Breeze). Location: Port Angeles Harbor near Port Angeles, Washington. Background: As part of its proposed international transmission cable analyzed in the Port Angeles-Juan de Fuca Transmssion Project EIS, Sea Breeze has proposed the drilling of a HDD hole to transition the cable from the sea bed of the Strait of Juan de Fuca to land. The HDD hole

318

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

319

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

320

Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008)  

Broader source: Energy.gov [DOE]

Federal Loan Guarantees For Projects That Employ Innovative Energy Efficiency, Renewable Energy, And Advanced Transmission And Distribution Technologies

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect (OSTI)

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

322

S. 522: A Bill to provide for a limited exemption to the hydroelectric licensing provisions of part I of the Federal Power Act for certain transmission facilities associated with the El Vado Hydroelectric Project in New Mexico. Introduced in the Senate of the United States, One Hundred Fourth Congress, First session  

SciTech Connect (OSTI)

This report discusses a bill that provides for a limited exemption to part I of the Federal Power Act dealing with the hydroelectric licensing provisions for certain transmission facilities associated with the El Vado Hydroelectric project in New Mexico.

NONE

1995-12-31T23:59:59.000Z

323

Section 406 Renewable Energy and Electric Transmission Loan Guarantee Program under ARRA  

Broader source: Energy.gov [DOE]

A temporary program for rapid deployment of renewable energy and electric power transmission projects.

324

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

325

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

326

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

327

Concept for Management of the Future Electricity System (Smart...  

Open Energy Info (EERE)

Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark...

328

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

SciTech Connect (OSTI)

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

2012-03-26T23:59:59.000Z

329

Identification and definition of unbundled electric generation and transmission services  

SciTech Connect (OSTI)

State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

Kirby, B.; Hirst, E.; Vancoevering, J.

1995-03-01T23:59:59.000Z

330

Blythe-Knob\t161-kV\tTransmission\tLine  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Blythe-Knob 161-kV Transmission Line Maintenance Project - Continuation Sheet Project Description (continued) The proposed project also includes vegetation management in one...

331

Responses of rice yield, irrigation water requirement and water use efficiency to climate change in China: Historical simulation and future projections  

Science Journals Connector (OSTI)

Abstract Rice is one of most important crops in China, accounting for approximately 18% of total cultivated area. Rice productivity is significantly affected by undergoing climate change and vulnerable with water stress. Therefore, investigating the responses of rice growth and water resources utilization to more pronounced climate change is of great importance for water resources planning and management in terms of maintaining the ecosystem integrity and ensuring the food security. In this study, the changes of rice yield, water consumption (ET), irrigation water requirement (IWR), water use efficiency (WUE) and irrigation water use efficiency (IWUE) from 1961 to 2010 in three typical sites (Kunshan and Nanjing in the Yangtze River Basin, and Kaifeng in the Yellow River Basin) in rice plantation region of China were evaluated by means of validated rice crop model ORYZA2000. Their responses to future climate scenarios of 21 century were investigated by driving ORYZA2000 with downscaling climatic data from HadCM3 (Hadley Centre Coupled Model version 3) under A2 and B2 emission scenarios with the help of a statistical downscaling method (SDSM). The results exhibit a significant decline in rice yield was identified by 49.3 kg ha?1, 32.0 kg ha?1 and 45.8 kg ha?1 for Kunshan station, Nanjing station and Kaifeng station, respectively, in the past 50 years due to obviously shortened rice growth duration (0.20 day a?1, 0.15 day a?1 and 0.27 day a?1, respectively). While changes of ET and IWE were different for three stations representing by significant increase of ET and IWE in Kunshan, non-significant increase in Nanjing and significant decrease in Kaifeng. Whereas accompanying production reduction, simulated WUE and IWUE for three stations all presented significant deceasing trends ranging from 0.06 kg ha?1 mm?1 to 0.16 kg ha?1 mm?1. The future projection results under IPCC SRES A2 and B2 emission scenarios indicated the generally negative effect of climate warming to rice yield (maximum by ?18.9% decline in 2090s in Kunshan) during the 21 century due to remarkable shortened growth period, resulting in generally depressed WUE and IWUE, although there would be the distinct response of the ET and IWR to future climate change for the three stations. Meanwhile, the increase of CO2 concentration under future climate is beneficial to raise the rice yield, alleviate crop water consumption and irrigation water requirements and improve the water use efficiencies of rice in a certain degree. Further works should be carried out to capture simulation uncertainties in climate change impact assessment with consideration of interactions among anthropogenic activities, environmental and biological factors.

Weiguang Wang; Zhongbo Yu; Wei Zhang; Quanxi Shao; Yiwei Zhang; Yufeng Luo; Xiyun Jiao; Junzeng Xu

2014-01-01T23:59:59.000Z

332

Saft Factory of the Future  

Broader source: Energy.gov (indexed) [DOE]

Future Principal Investigator - Peter Denoncourt Presentors - Karen Conner Saft America Inc. June 11, 2011 Project ID: ARRAVT007 This presentation does not contain any proprietary,...

333

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

334

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

335

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

336

Coordinating Interstate ElectricTransmission Siting: An Introduction...  

Broader source: Energy.gov (indexed) [DOE]

future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other strategies...

337

Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

338

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

339

Notice of Intent to prepare an environmental impact statement for the Eastern Plains Transmission Project, Colorado and Kansas (DOE/EIS-0390) (08/02/06)  

Broader source: Energy.gov (indexed) [DOE]

733 Federal Register 733 Federal Register / Vol. 71, No. 148 / Wednesday, August 2, 2006 / Notices term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all

340

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

342

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC line from West Texas to DallasFort...

343

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

344

Transmission Workshop  

Broader source: Energy.gov (indexed) [DOE]

WORKSHOP WORKSHOP DOUBLETREE CRYSTAL CITY NOVEMBER 1-2, 2012 Anjan Bose, Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT)  The Grid Tech Team (GTT), established by the Office of the Undersecretary of Energy, was tasked with coordinating grid-related activities across the Department and accelerating modernization of the electric power system.  Currently, the GTT comprise of representatives from OE, EERE, ARPA-E, Fossil Energy, Science, Policy and International Affairs, CFO, and the Office of the Secretary of Energy. Vision of the Future Grid A seamless, cost-effective electricity system, from generation to end- use, capable of meeting all clean energy demands and capacity requirements, while allowing consumer participation and electricity

345

THE PROJECT-X INJECTOR EXPERIMENT: A NOVEL HIGH PERFORMANCE FRONT-END FOR A FUTURE HIGH POWER PROTON FACILITY AT FERMILAB  

SciTech Connect (OSTI)

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H* ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

Nagaitsev, S.; et al,

2013-09-25T23:59:59.000Z

346

Notice of Availability of Plains & Eastern Clean Line Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242 -...

347

Construction of Central Ferry-Lower Monumental Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

power line capabilities include transmission, overhead and underground distribution and substation projects. BPA also will be holding two "Meet the Builder" open-houses in late...

348

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency,… (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

349

BPA proposes rate increase to bolster federal power and transmission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA-proposes-rate-increase-to-bolster-federal-power-and-transmission-systems Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects...

350

Department of Energy Finalizes Loan Guarantee for New Transmission...  

Office of Environmental Management (EM)

Nevada, improving grid reliability and efficiency. "As our country increases its use of alternative energy sources, new transmissions lines like the ON Line project will play a...

351

RAPID/Geothermal/Transmission Siting & Interconnection/Hawaii...  

Open Energy Info (EERE)

Utilities Commission to interconnect a proposed renewable energy project to the existing grid. Transmission Siting Threshold: No threshold provided Public Utility Definition for...

352

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

353

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

354

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project in project management, Stevens was the third university worldwide to receive global project management

Yang, Eui-Hyeok

355

NREL: Transmission Grid Integration - Webinars  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

356

Dynamic Transmission Electron Microscopy  

SciTech Connect (OSTI)

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

357

NREL: Transmission Grid Integration - Research Staff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

358

RRTT - Rapid Response Team for Transmission  

Broader source: Energy.gov (indexed) [DOE]

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

359

Future Accelerators (?)  

E-Print Network [OSTI]

I describe the future accelerator facilities that are currently foreseen for electroweak scale physics, neutrino physics, and nuclear structure. I will explore the physics justification for these machines, and suggest how the case for future accelerators can be made.

John Womersley

2003-08-09T23:59:59.000Z

360

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

362

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

363

State transmission infrastructure authorities: the story so far  

SciTech Connect (OSTI)

State transmission infrastructure authorities offer a new tool for helping to overcome such obstacles to developing transmission as high capital investment requirements, uncertain cost allocation among multiple parties, and siting and permitting challenges. Yet to be determined is whether they can help stimulate large, multi-state regional transmission projects. (author)

Porter, Kevin; Fink, Sari

2009-03-15T23:59:59.000Z

364

Shiny quantum dots brighten future of solar cells  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shiny quantum dots brighten future of solar cells Shiny quantum dots brighten future of solar cells The project demonstrates that superior light-emitting properties of quantum dots...

365

Secretary Chu Announces Progress on BPA Recovery Act Project | Department  

Broader source: Energy.gov (indexed) [DOE]

Progress on BPA Recovery Act Project Progress on BPA Recovery Act Project Secretary Chu Announces Progress on BPA Recovery Act Project August 10, 2009 - 12:00am Addthis Richland, Wash. - With the goal of bringing new jobs and green power to the West, Energy Secretary Steven Chu today announced the start of the McNary-John Day transmission project in Washington and Oregon, which will be funded by $343 million from the American Recovery and Reinvestment Act. The project is expected to deliver almost 600 megawatts of clean, renewable wind energy to homes and business across the West. "These Recovery Act funds are putting people to work today to build the infrastructure that will be vital to our economy in the future," said U.S. Energy Secretary Steven Chu. "By integrating renewable energy sources onto

366

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

family and multi?family residential buildings, the model is wall area of a building shall be   Multi-Family Rules ofclass Building type Floor area Single-family home all Multi-

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

367

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

2009.   Inverter  Test Procedures Solar Generation Impact Conditioner Testing Procedures  Appendix B: Air Conditioner air conditioner testing procedures and results from studies 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

368

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

R22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)LRA (AMPS) Phase Refrigerant Charge (LBS) Voltage (V) PMAXR22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

369

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

at PSE is to collect load data for validating dynamic and approach decomposes recorded load data into different load “to continuously record load data for a selected time period

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

370

Big Eddy-Knight Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4 miles northwest of...

371

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

BPA), the basic requirements for an improved load model were determined. These requirements included modeling the substation

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

372

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

such as synchronous and induction generators.   Most of the as  synchronous and induction generators.   Most of the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

373

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Unit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FAN

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

374

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

to be the compact fluorescent bulbs (CFBs) that the engineerbulbs with compact fluorescent bulbs (CFBs) continues to

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

375

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

pump heating fraction, EF heatpump , shall be the fraction q P p P q (P) (Q) (B) Lighting Washing Heating 0.1F heatpump0.3F heatpump Cooling Refrigeration Z q Hotwater Plugs Z p (

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

376

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

commercial building energy use and cost analysis. With input of building layout, construction types, space usage,

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

377

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

and Africa (PVGIS).  National Renewable Energy Laboratory has solar and Africa [14].  National Renewable Energy Laboratory (NREL) has solar 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

378

Hooper Springs Transmission Project Final Environmental Impact...  

Energy Savers [EERE]

like to ensure that our ability to utilize this location as a borrow source for growth media remains unencumbered, which may necessitate BPA re-grading or realigning the access...

379

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Bulk System Load  Model in GE PSLF TM for Investigating the a Bulk System Load Model in GE PSLF TM for Investigating thecomposite load model in  the PSLF simulation software; the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

380

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

like hardware (PMU), software and data communication. TheSpecifications and Technical Data PMU Model Number of NumberPMU Specifications and Technical Data ..

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

GTT 2012 Transmission Workshop - Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Workshop - Documents Transmission Workshop - Documents GTT 2012 Transmission Workshop - Documents Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012 Agenda Roster of Attendees Presentation - Overview - Anjan Bose, DOE Presentation - EERE Issues and Opportunities - David Danielson, DOE Presentation - Vision for the Future - Lauren Azar, DOE Presentation - Tomorrow's Power System - Michael Heyeck, EPRI Presentation - FERC Overview - Cheryl LaFleur, FERC Presentation - ISO/RTO Challenges and Opportunities - Carl Monroe, Southwest Power Pool Product - Future Vision & Grid Challenges: Summary Results of Breakout Group Discussions Product - Opportunities to Overcome Key Challenges: Summary Results of Breakout Group Discussions Product - Final Discussion Summary Report

382

Fermilab | Plan for the Future | Fermilab's Future  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fermilab's Future Fermilab's Future 2013-2015 Next Fermilab's research program for 2015 and beyond New facilities at Fermilab, the nation's dedicated particle physics laboratory, would provide thousands of scientists from across the United States and around the world with world-class scientific opportunities. In collaboration with the Department of Energy and the particle physics community, Fermilab is pursuing a strategic plan that addresses fundamental questions about the physical laws that govern matter, energy, space and time. Fermilab is advancing plans for the best facilities in the world for the exploration of neutrinos and rare subatomic processes, far beyond current global capabilities. The proposed construction of a two-megawatt high-intensity proton accelerator, Project X, would enable a comprehensive

383

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

384

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

385

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

386

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

387

Renewable Project Overview  

Broader source: Energy.gov (indexed) [DOE]

Project Overview Project Overview Federal Utility Partnership Working Group 5/6/09 Chandra Shah, NREL 303-384-7557, chandra.shah@nrel.gov National Renewable Energy Laboratory Innovation for Our Energy Future Presentation Overview Federal and utility renewable requirements Power Purchase Agreements (PPA) Western Area Power Administration Federal Renewable Program UESC and renewables * Participating in utility renewable programs - Opportunity Announcement process Renewable projects implemented using appropriations National Renewable Energy Laboratory Innovation for Our Energy Future Biomass Resource

388

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

389

The Substation of the Future: A Feasibility Study  

E-Print Network [OSTI]

The Substation of the Future: A Feasibility Study Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Substation of the Future Engineering Research Center (PSERC) research project T-38 titled "Substation of the Future: A Feasibility

390

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

391

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

392

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

393

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

394

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

395

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

396

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

397

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

398

Sea-Level Rise, El Niño, And The Future Of The California Coastline  

E-Print Network [OSTI]

Projected future coastal flood inundation maps using NOAA’sProjected future coastal flood inundation map for the SantaBarbara’s potential future flood elevations, 2010 LiDAR data

Russell, Nicole Lian

2014-01-01T23:59:59.000Z

399

The Economic Case for Bulk Energy Storage in Transmission Systems  

E-Print Network [OSTI]

The Economic Case for Bulk Energy Storage in Transmission Systems with High Percentages to Engineer the Future Electric Energy System #12;#12;The Economic Case for Bulk Energy Storage Economic Case for Bulk Energy Storage in Transmission Sys- tems with High Percentages of Renewable

400

Uncertainty in emissions projections for climate models  

E-Print Network [OSTI]

Future global climate projections are subject to large uncertainties. Major sources of this uncertainty are projections of anthropogenic emissions. We evaluate the uncertainty in future anthropogenic emissions using a ...

Webster, Mort David.; Babiker, Mustafa H.M.; Mayer, Monika.; Reilly, John M.; Harnisch, Jochen.; Hyman, Robert C.; Sarofim, Marcus C.; Wang, Chien.

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

402

Market-based Investment in Electricity Transmission Networks: Controllable Flow  

E-Print Network [OSTI]

in new lines, rather than small-scale network upgrades. Whereas market-based transmission investment may mitigate the problem of under- investment, it is unlikely to suffice alone and thus regulated projects by the designated transmission system... aims at transmission of bulk power to be less than small-scale AC network deepening projects; even if these AC projetcs are small scale, they may be large compared to the size of their market. The DC-interconnector projects in the USA are typically...

Brunekreeft, Gert

2004-06-16T23:59:59.000Z

403

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Broader source: Energy.gov (indexed) [DOE]

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

404

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Broader source: Energy.gov (indexed) [DOE]

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

405

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect (OSTI)

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

406

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect (OSTI)

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

407

BLM Approves California Geothermal Development Project | Department...  

Broader source: Energy.gov (indexed) [DOE]

16 new production and injection wells, multiple pipelines, and an electric transmission line. Ormat Nevada Inc. will develop the project on public and private land. When completed,...

408

Transmission/Nepa Database | Open Energy Information  

Open Energy Info (EERE)

Nepa Database Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Document Collections (1) Have a NEPA Document Collection to add that doesn't yet exist in this collection? Make sure it doesn't already exist: Please be sure to search this page by serial number and by document number Add.png Add a new NEPA Document Collection This query has been included to allow you to use the black arrows in the table header cells to sort the table data. Document Name Serial Number Analysis Type Transmission Type Project Area Applicant Lead Agency District Office Project Phase(s) TransWest EIS 600kV Wyoming Western Power Administration BLM BLM Wyoming State Office

409

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

410

Transmission/Resource Library/MOU | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library/MOU < Transmission‎ | Resource Library Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Memorandums of Understanding (MOUs)for Interstate Transmission Projects Multi-state transmission siting and permitting projects benefit from effective collaboration between government entities, tribes, project

411

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

412

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

413

Optimizing Storages for Transmission System Operation  

Science Journals Connector (OSTI)

Abstract A growing amount of congestions is expected for future operation of electrical transmission grids in Europe. Within this context, storages can be used to assist transmission system operators in daily operation and to avoid costly redispatch measures. In this paper, a research methodology to evaluate impact and interdependencies between market operation of storages and participation in redispatch measures is presented. Furthermore, a methodology for the evaluation of benefits by storages solely administrated by TSO is introduced. The methods are evaluated in a case study for the German electricity system in the year 2020.

Jonas Eickmann; Tim Drees; Jens D. Sprey; Albert Moser

2014-01-01T23:59:59.000Z

414

Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.: Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line Project: Federal Register Notice, Volume 79, No. 190- Oct. 1, 2014  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) announces its decision to issue a Presidential permit to Champlain Hudson Power Express, Inc. (CHPEI), to construct, operate, maintain, and connect an electric transmission line across the U.S./Canada border in the northeastern New York State.

415

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

416

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

417

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

418

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

419

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

420

Generation and Transmission Maximization Model | Open Energy Information  

Open Energy Info (EERE)

Generation and Transmission Maximization Model Generation and Transmission Maximization Model Jump to: navigation, search Tool Summary Name: Generation and Transmission Maximization Model Agency/Company /Organization: Argonne National Laboratory Sector: Energy Topics: Pathways analysis Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.dis.anl.gov/projects/Gtmax.html Cost: Paid Generation and Transmission Maximization Model Screenshot References: Generation and Transmission Maximization Model [1] Logo: Generation and Transmission Maximization Model The GTMax model helps researchers study complex marketing and system operational issues. With the aid of this comprehensive model, utility operators and managers can maximize the value of the electric system, taking into account not only its limited energy and transmission resources,

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

GRR/Section 8 - Transmission Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8 - Transmission Overview GRR/Section 8 - Transmission Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8 - Transmission Overview 08 - TransmissionOverview.pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Regulations & Policies FERC Order No. 2003 FERC Order No. 2006 Triggers None specified Click "Edit With Form" above to add content 08 - TransmissionOverview.pdf 08 - TransmissionOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The siting of an individual project can have a major impact on transmission and interconnection. 8.1 - Will the Power Plant Developer Negotiate an Interconnection

422

NREL: Energy Analysis - Transportation Energy Futures Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pathways: An Examination of Timing and Investment Constraints Non-Light-Duty Vehicles Potential for Energy Efficiency Improvement Beyond the Light-Duty Sector Fuels Alternative...

423

Connecticut Clean Cities Future Fuels Project  

Broader source: Energy.gov (indexed) [DOE]

signed with 31 of 31 * NEPA Documentation Submitted for 100% of vehicle purchases and conversions 100% of infrastructure locations * 100% of Vehicle NEPA's approved by DOE...

424

Connecticut Clean Cities Future Fuels Project  

Broader source: Energy.gov (indexed) [DOE]

Accomplishments * NEPA Documentation Submitted for 100% of vehicle purchases and conversions and infrastructure locations * 100% of Vehicle NEPA's approved by DOE * 90% of...

425

Connecticut Clean Cities Future Fuels Project  

Broader source: Energy.gov (indexed) [DOE]

31 * NEPA Documentation Submitted for 100% of vehicle purchases 100% of vehicle conversions 75% of infrastructure locations * 100% of Vehicle NEPA's approved by DOE *...

426

Energy Workforce Training Future Need and Projections  

E-Print Network [OSTI]

effort between a university, a two-year college, state Energy Office, and industry to address training of students for careers in industrial energy sector. In addition to describing the experiences of offering short course modules to train tradesmen... Energy Office and its collaborators have considered non-credit and certificate courses for employees of the manufacturing industries in Little Rock and other parts of the state. A large number of 2-year colleges, 22 in total in the state, provided...

Midturi, S.; Pidugu, S. B.

2006-01-01T23:59:59.000Z

427

This Letter presented projections of future sea-level rise based on simulations of the past 22,000 years of sea-level history using a simple, empirical model linking sea-level rise to global mean-temperature anomalies. One of the main conclusions of the L  

E-Print Network [OSTI]

This Letter presented projections of future sea-level rise based on simulations of the past 22,000 years of sea-level history using a simple, empirical model linking sea-level rise to global mean of sea-level rise during the twenty-first century that are reported in the Fourth Assessment Report

Siddall, Mark

428

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

429

Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08  

SciTech Connect (OSTI)

Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

N /A

2001-04-23T23:59:59.000Z

430

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

431

Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management Maricopa County, Arizona Categorical Exclusion Continuation Sheet Project...

432

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

433

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

434

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

435

Wireless Power Transmission: An Obscure History, Possibly a Bright Future.  

E-Print Network [OSTI]

the use of microwaves because of the economic and energy efficiency that can be leveraged by products) and James F. Trimer (NASA) announced the development of a thin-film plastic rectenna using printed

La Rosa, Andres H.

436

Application Filling Requirements for Transmission Line and Substation  

Broader source: Energy.gov (indexed) [DOE]

Application Filling Requirements for Transmission Line and Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Wind Solar Program Info

437

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

438

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

439

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

440

HVDC submarine power cables systems state of the art and future developments  

SciTech Connect (OSTI)

The paper begins with an introduction on the reasons that lead to the use of HVDC submarine cable links. The main aspects for the choice of direct current are presented as well as the advantages deriving from the utilization of submarine cables. The second part is dedicated to a discussion on the various type of insulation that could be used in power cables and their possible application to HVDC submarine cables. In the following there is a description of the main characteristics and technical details of some particular project that at present time (1995) are in progress. Two projects are briefly presented: Spain-Morocco, a 26 km long interconnection for the transmission, in a first phase, of 700 MW from Spain to Morocco at 400 kV a.c. by means of three cables, plus one spare, of the fluid filled type. The cables are designed for a future change to d.c. 450 kV, allowing a transmission of 500 MW each (i.e., 2 GW total). One of the peculiarities of the link is the maximum water depth of 615 m (world record for submarine power cables at the time of installation). Italy-Greece, a 1km long interconnection for the transmission of 500 MW (bi-directional) by means of one paper insulated mass impregnated cable having 1,250 sq mm conductor size and insulated for a rated voltage of 400 kV. This link (the installation of which will be posterior to the Spain-Morocco) will attain the world record for the maximum water depth for submarine power cables: 1,000 m. The last part deals with the future developments expected in this field, in terms of conductor size and voltage, that means an increase in transmissible capacity.

Valenza, D.; Cipollini, G. [Pirelli Cavi S.p.A., Milano (Italy)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

442

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

443

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

444

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

445

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

446

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

447

DOE Seeking Information on Transmission Line Permitting | Department of  

Broader source: Energy.gov (indexed) [DOE]

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

448

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity, consistency, and transparency by describing each entity's role and responsibilities when project applicants wish to build electric transmission facilities. Additionally, the MOU designates a "Lead Agency" serving as the single point-of-contact for coordinating all federal environmental reviews

449

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

450

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

451

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

452

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

453

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

454

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

455

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

456

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

457

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

458

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

459

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

460

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

California/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

California/Transmission/State Regulations California/Transmission/State Regulations < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process Transmission lines 200 kV or greater are required to undergo a two-part state siting and permitting process with the California Public Utility Commission (CPUC). One part of the process will analyze the need for the project and consists of obtaining a Certificate of Public Convenience and Necessity (CPCN) from the California Energy Commission (CEC). The other part of the process will analyze environmental and community impacts in the

462

The future of oil: unconventional fossil fuels  

Science Journals Connector (OSTI)

...groundwater contamination. Nevertheless, innovative solutions have been found to many of...long project lead times, environmental remediation and the future oil price. Canadian...operations, being cheaper than mining; -innovative technology; -co-generation to reduce...

2014-01-01T23:59:59.000Z

463

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

464

Bayesian Image Reconstruction for Transmission Tomography Using Deterministic Annealing  

E-Print Network [OSTI]

and non-medical applications, however, the measured projection data are photon limited and the imaging;1 INTRODUCTION Transmission tomography is perhaps most familiar in its medical guise as CT (computed tomogra- phy procedure. Because of the relatively high dose in conventional CT, the measured projection data contain

Rangarajan, Anand

465

Framtidens lantbruk / Future Agriculture Future Agriculture  

E-Print Network [OSTI]

Framtidens lantbruk / Future Agriculture Future Agriculture ­ Livestock, Crops and Land Use Report from a multidisciplinary research platform. Phase I (2009 ­ 2012) #12;Future Agriculture ­ Livestock Waldenström Utgivningsår: 2012, Uppsala Utgivare: SLU, Framtidens lantbruk/Future Agriculture Layout: Pelle

466

High-Temperature Superconductivity Cable Demonstration Projects  

Broader source: Energy.gov (indexed) [DOE]

Temperature Temperature Superconductivity Cable Demonstration Projects Superconductivity Power Equipment www.oe.energy.gov Phone: 202-586-1411 Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585. Plugging America Into the Future of Power "A National Effort to Introduce New Technology into the Power Delivery Infrastructure" "In order to meet President Obama's ambitious energy goals, we must modernize the nation's electrical grid to improve the transmission, storage and reliability of clean energy across the country and help to move renewable energy from the places it can be produced to the places it can be used. The Department of Energy is working with industry partners to develop the

467

The aim of this project is to develop an ultrasonic device for parametric imaging of standing trees. The device is designed to perform both transmission and reflection measurements that can be therefore used for quantitative  

E-Print Network [OSTI]

The aim of this project is to develop an ultrasonic device for parametric imaging of standing trees the velocity) and the attenuation of the ultrasonic waves. Tomograms were computed by fast algebraic algorithms the acceleration on circumferen- tial points (accelerometer) with a limited number of sensors. These methods give

Boyer, Edmond

468

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

469

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

470

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

471

DSW Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

472

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

473

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

474

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

475

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

476

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

477

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

478

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

479

Record of Decision for the Modification and Construction of Transmission Lines for the U.S. 93 Hoover Dam Bypass Project (DOE/EIS-0352) (10/1/02)  

Broader source: Energy.gov (indexed) [DOE]

9 9 Federal Register / Vol. 67, No. 190 / Tuesday, October 1, 2002 / Notices ''Procedures for Public Participation in Power and Transmission Rate Adjustment,'' has been followed in connection with the proposed rate adjustment. More specifically, opportunities for public review and comment during a 90-day period on the proposed Rayburn power rate were announced by notice published in the Federal Register, May 21, 2002, 67 FR 35805. A Public Information Forum was scheduled to be held June 6, 2002, and a Public Comment Forum was scheduled to be held July 10, 2002, both in Tulsa, Oklahoma. Both forums were canceled as no one expressed an intent to participate. Written comments were due by August 19, 2002. Southwestern provided notice of the Federal Register,

480

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

Note: This page contains sample records for the topic "future transmission projections" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

482

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

483

California’s Energy Future: Transportation Energy Use in California  

E-Print Network [OSTI]

Assessment of Future Li-Ion Battery Production Costs. GermanNREL’s PHEV/EV Li-ion Battery Secondary-Use Project.

Yang, Christopher; Ogden, Joan M; Hwang, Roland; Sperling, Daniel

2011-01-01T23:59:59.000Z

484

Bayesian Image Reconstruction for Transmission Tomography Using Mixture Model Priors and Deterministic Annealing  

E-Print Network [OSTI]

degradations in emission computed tomography (ECT) for both PET and SPECT. To improve quantitative accuracy transmission projection data. However, the transmission projection data is itself usually very noisy due to the necessities of a short-time acquisition and limited count rate . The low-count data makes the reconstruction

485

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

486

Natural gas transmission and distribution model of the National Energy Modeling System  

SciTech Connect (OSTI)

The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of Integrated Analysis and Forecasting of the Energy Information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. From 1982 through 1993, the Intermediate Future Forecasting System (IFFS) was used by the EIA for its analyses, and the Gas Analysis Modeling System (GAMS) was used within IFFS to represent natural gas markets. Prior to 1982, the Midterm Energy Forecasting System (MEFS), also referred to as the Project Independence Evaluation System (PIES), was employed. NEMS was developed to enhance and update EIA`s modeling capability by internally incorporating models of energy markets that had previously been analyzed off-line. In addition, greater structural detail in NEMS permits the analysis of a broader range of energy issues. The time horizon of NEMS is the midterm period (i.e., through 2015). In order to represent the regional differences in energy markets, the component models of NEMS function at regional levels appropriate for the markets represented, with subsequent aggregation/disaggregation to the Census Division level for reporting purposes.

NONE

1997-02-01T23:59:59.000Z

487

Fiscal fragility: what the past may say about the future  

E-Print Network [OSTI]

real interest rates and GDP growth rate. For a given future projectedit with the projected debt to GDP ratio. Real rates forit with the projected debt to GDP ratio. Real rates for

Aizenman, Joshua; Pasricha, Gurnain Kaur

2010-01-01T23:59:59.000Z

488

The Wind Project Development Process  

Wind Powering America (EERE)

Wind Project Wind Project Development Process Developed for the National Renewable Energy Laboratory by Dale Osborn Distributed Generation Systems, Inc. September 1998 The Wind Project Development Process Site Selection Land Agreements Wind Assessment Environmental Review Economic Modeling Interconnection Studies Financing Permitting Sales Agreements Turbine Procurement Construction Contracting Operations & Maintenance Site Selection Evidence of Significant Wind Preferably Privately Owned Remote Land Proximity to Transmission Lines Reasonable Road Access Few Environmental Concerns Receptive Community Land Agreements Term: Expected Life of the Turbine Assignable Indemnification Rights Compensation: Percentage of Revenues Reclamation Provision Wind Rights, Ingress/Egress Rights, Transmission Rights

489

Coordinating Interstate ElectricTransmission Siting: An Introduction to the  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate ElectricTransmission Siting: An Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate In recent years, experts have started drawing att ention to the need to improve the system that transmits electricity from power plants to demand centers. Congestion on existing lines, increased energy demand that suggests a need for new electric transmission and the challenge of connecting renewable energy sources to load centers highlight some needs that could be underserved by the existing system in the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other strategies (such as distributed

490

Category:Smart Grid Investment Grant Projects | Open Energy Information  

Open Energy Info (EERE)

Investment Grant Projects Investment Grant Projects Pages in category "Smart Grid Investment Grant Projects" The following 98 pages are in this category, out of 98 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project Atlantic City Electric Company Smart Grid Project Avista Utilities Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project Burbank Water and Power Smart Grid Project C CenterPoint Energy Smart Grid Project Central Lincoln People's Utility District Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project

491

Project Fact Sheet Long Island HTS Power Cable Superconducting  

Broader source: Energy.gov (indexed) [DOE]

Long Long Island HTS Power Cable Superconducting Power Equipment www.oe.energy.gov Phone: 202-586-1411 Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585 Plugging America Into the Future of Power What is the status of the Project? The cable was energized April 22, 2008 and serves the equivalent of 300,000 homes. It is the first HTS power cable to operate at transmission voltage in the grid. LIPA plans to retain the superconductor as a permanent part of it's grid. This project involves the demonstration of a high- temperature superconducting (HTS) power cable in the Long Island Power grid, spanning nearly half a mile and serving as a permanent link in the Long Island Power

492

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

493

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

494

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

495

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Carolinas LLC Smart Grid Project Duke Energy Carolinas Carolinas LLC Smart Grid Project Duke Energy Carolinas LLC Smart Grid Project Charlotte North Carolina Entergy Services Inc Smart Grid Project Entergy Services Inc Smart Grid Project New Orleans Louisiana ISO New England Incorporated Smart Grid Project ISO New England Incorporated Smart Grid Project Holyoke Massachusetts Connecticut Maine New Hampshire Rhode Island Vermont Midwest Energy Inc Smart Grid Project Midwest Energy Inc Smart Grid Project Hays Kansas Midwest Independent Transmission System Operator Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project Carmel Indiana Iowa Illinois Michigan Minnesota Missouri Montana North Dakota Ohio Pennsylvania South Dakota Wisconsin New York Independent System Operator Inc Smart Grid Project New York

496

OVERVIEW OF THE COUPLED MODEL INTERCOMPARISON PROJECT  

Science Journals Connector (OSTI)

The Coupled Model Intercomparison Project (CMIP) involves study and intercomparison of multi-model simulations of present and future climate. The simulations of the future use idealized forcing in increase is compounded which CO2 1% yr?1 until it ...

Gerald A. Meehl; Curt Covey; Bryant McAvaney; Mojib Latif; Ronald J. Stouffer

2005-01-01T23:59:59.000Z

497

Projections of Full-Fuel-Cycle Energy and Emissions Metrics  

E-Print Network [OSTI]

energy and emissions intensity of unconventional production are at best a lower bound, and current projections of future

Coughlin, Katie

2013-01-01T23:59:59.000Z

498

Future gulf dynamics and US security  

SciTech Connect (OSTI)

This documental briefing synthesizes the results of a research project, entitled 'Future Security Requirements for the Gulf.' It represents an effort to pull together much of the detailed work conducted during this project and focuses on the principal factors driving the future environment in the greater Gulf region, on the implications of the resulting findings for future Gulf security and for the U.S. regional posture in the area, and on a broad examination of alternative U.S. approaches to its security in the Gulf. The overall project objective was to provide a political-military assessment of security prospects in the Gulf over the next 3 to 5 years, challenges the U.S. military are likely to encounter as they support U.S. national objectives in the region, and the broader implications for future U.S. security planning.

Nardulli, B.; Agmon, M.; Karasik, T.; Kechichian, J.A.; Morris, M.E.

1994-01-01T23:59:59.000Z

499

Research project on CO2 geological storage and groundwater resources: Large-scale hydrological evaluation and modeling of impact on groundwater systems  

E-Print Network [OSTI]

Conversion and Management. NETL Project Annual Report,a future project phase. NETL Project Annual Report, October70 NETL Project Annual Report, October 1, 2006 to September

Birkholzer, Jens; Zhou, Quanlin; Rutqvist, Jonny; Jordan, Preston; Zhang, K.; Tsang, Chin-Fu

2008-01-01T23:59:59.000Z

500

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Broader source: Energy.gov (indexed) [DOE]

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3