National Library of Energy BETA

Sample records for fourth quarter fy

  1. Environmental Compliance Performance Scorecard ¬タモ Fourth Quarter FY2009

    Office of Environmental Management (EM)

    4TH-QUARTER-FY-2009-REGULATORY-COMPLIANCE-SCORECARD-02-19-10.xls Page 1 of 58 EA MILESTONES MISSED DURING QUARTER (07/2009 - 09/2009) / TOTAL QUARTER EA MILESTONES AT RISK EA MILESTONES NEXT FOUR QUARTERS (10/2009 - 09/2010) / TOTAL FOUR QUARTERS EA MILESTONES Argonne GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven GREEN GREEN (0 / 0) GREEN (0 / 1) N / A N / A N / A Carlsbad 1 previous Non-Impacting State NOV (with minor fine), 1 previous Non-Impacting State NOV, & 1 previous

  2. Environmental Compliance Performance Scorecard ¬タモ Fourth Quarter FY2010

    Office of Environmental Management (EM)

    0-SCORECARD-12-29-10.xlsx Page 1 of 73 EA & PEA MILESTONES MET DURING QUARTER (07/2010 - 09/2010) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (10/2010 - 09/2011) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) 1 previous Non-Impacting State NOV (with minor

  3. Environmental Compliance Performance Scorecard ¬タモ Fourth Quarter FY2011

    Office of Environmental Management (EM)

    1-SCORECARD-01-31-12.xlsx Page 1 of 88 EA & PEA MILESTONES MET DURING QUARTER (07/2011 - 09/2011) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (10/2011 - 09/2012) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN (CHANGED FROM YELLOW) --- 1 previous

  4. FY 2010 Fourth Quarter Report: Evaluation of the Dependency of Drizzle Formation on Aerosol Properties

    SciTech Connect (OSTI)

    Lin, W; McGraw, R; Liu, Y; Wang, J; Vogelmann, A; Daum, PH

    2010-10-01

    Metric for Quarter 4: Report results of implementation of composite parameterization in single-column model (SCM) to explore the dependency of drizzle formation on aerosol properties. To better represent VOCALS conditions during a test flight, the Liu-Duam-McGraw (LDM) drizzle parameterization is implemented in the high-resolution Weather Research and Forecasting (WRF) model, as well as in the single-column Community Atmosphere Model (CAM), to explore this dependency.

  5. EMSL Quarterly Highlights Report: FY09, 3rd Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

    2009-07-17

    This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

  6. EMSL Quarterly Highlights Report: 4th Quarter, FY08

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2008-11-24

    This report outlines the science highlights, publications, and other happenings at EMSL in 4th quarter of FY08.

  7. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Fourth Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-12-02

    This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNL’s Legal Services were submitted to all the parties for signatures.

  8. Natural Gas Imports and Exports Fourth Quarter Report 2015 |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Report 2015 Natural Gas Imports and Exports Fourth Quarter Report 2015 PDF icon 4Q2015.pdf More Documents & Publications Natural Gas Imports and Exports Fourth ...

  9. Post Competition Accountability Report: First Quarter, FY2013 | Department

    Energy Savers [EERE]

    of Energy Post Competition Accountability Report: First Quarter, FY2013 Post Competition Accountability Report: First Quarter, FY2013 Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012 Fiscal Years (FY) 2012 - 2016: Reporting Period: First Quarter, FY2013 PDF icon Post Competition Accountability Report: First Quarter, FY2013 More Documents & Publications Post Competition Accountability Report: Second Quarter, FY 2013 Post Competition

  10. EMSL Quarterly Highlights Report: FY09, 4th Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

    2009-10-21

    This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

  11. Natural Gas Imports and Exports - Fourth Quarter Report 2011 | Department

    Energy Savers [EERE]

    of Energy 1 Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Fourth Quarter Report 2011 PDF icon Natural Gas Imports and Exports - Fourth Quarter Report 2011 More Documents & Publications Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third

  12. Natural Gas Imports and Exports - Fourth Quarter Report 2012 | Department

    Energy Savers [EERE]

    of Energy 2 Natural Gas Imports and Exports - Fourth Quarter Report 2012 Natural Gas Imports and Exports - Fourth Quarter Report 2012 PDF icon Natural Gas Imports and Exports - Fourth Quarter Report 2012 More Documents & Publications Natural Gas Imports and Exports - Fourth Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Second

  13. Post Competition Accountability Report: Second Quarter, FY 2013

    Broader source: Energy.gov [DOE]

    Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012–2016: Reporting Period: Second Quarter, FY 2013

  14. Post Competition Accountability Report: Third Quarter, FY 2013

    Broader source: Energy.gov [DOE]

    Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012–2016: Reporting Period: Third Quarter, FY 2013

  15. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    SciTech Connect (OSTI)

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  16. Fossil Energy Today - Fourth Quarter, 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Fossil Energy Today - Fourth Quarter, 2011 Topics In This Issue.... Industrial Carbon Capture, Storage Project Begins Construction A New Path Forward: CCUS FE R&D: A Legacy of Benefit NETL Helps Develop Improved Coronary Stents for Heart Patients CSLF Ministerial Reinforces Support for CCUS PDF icon Fossil Energy Today - Issue No. 4, Fourth Quarter, 2011 More Documents & Publications Fossil Energy Today - Third Quarter, 2011 Fossil Energy Today - Fourth Quarter, 2012 Fossil Energy

  17. FY 2013 Overall Contract and Project Management Improvement Performance Metrics and Targets

    Broader source: Energy.gov [DOE]

    Overall Contract and Project Management Performance Metrics and Targets for FY 2013, first quarter through fourth quarter.

  18. PBL FY 2002 Second Quarter Review Forecast of Generation Accumulated...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Slice true-ups, and actual expense levels. Any variation of these can change the net revenue situation. FY 2002 Forecasted Second Quarter Results 170 (418) FY 2002 Unaudited...

  19. FY 2009 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 9 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2009 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2009, first quarter through fourth quarter. PDF icon FY 2009 1st Quarter Metrics PDF icon FY 2009 2nd Quarter Metrics PDF icon FY 2009 3rd Quarter Metrics PDF icon FY 2009 4th Quarter Metrics Key

  20. FY 2010 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 0 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2010 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2010, first quarter through fourth quarter. PDF icon FY 2010 1st Quarter Metrics PDF icon FY 2010 2nd Quarter Metrics PDF icon FY 2010 3rd Quarter Metrics PDF icon FY 2010 4th Quarter Metrics Key

  1. FY 2011 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 1 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2011 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2011, first quarter through fourth quarter. PDF icon FY 2011 1st Quarter Metrics PDF icon FY 2011 2nd Quarter Metrics PDF icon FY 2011 3rd Quarter Metrics PDF icon FY 2011 4th Quarter Metrics Key

  2. FY 2012 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 2 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2012 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2012, first quarter through fourth quarter. PDF icon FY 2012 1st Quarter Metrics PDF icon FY 2012 2nd Quarter Metrics PDF icon FY 2012 3rd Quarter Metrics PDF icon FY 2012 4th Quarter Metrics Key

  3. FY 2014 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 4 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2014 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2014, first quarter through fourth quarter. PDF icon FY 2014 1st Quarter Metrics PDF icon FY 2014 2nd Quarter Metrics PDF icon FY 2014 3rd Quarter Metrics PDF icon FY 2014 4th Quarter Metrics Key

  4. FY 2015 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 5 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2015 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2015, first quarter through fourth quarter. PDF icon FY 2015 1st Quarter Metrics PDF icon FY 2015 2nd Quarter Metrics PDF icon FY 2015 3rd Quarter Metrics PDF icon FY 2015 4th Quarter Metrics Key

  5. Natural Gas Imports and Exports Fourth Quarter Report 2013 | Department of

    Energy Savers [EERE]

    Energy 3 Natural Gas Imports and Exports Fourth Quarter Report 2013 Natural Gas Imports and Exports Fourth Quarter Report 2013 PDF icon Natural Gas Imports and Exports Fourth Quarter Report 2013 More Documents & Publications Natural Gas Imports and Exports Third Quarter Report 2013 Natural Gas Imports and Exports - Third Quarter Report 2014 Natural Gas Imports and Exports - Second Quarter Report 2013

  6. 2nd Quarter Transportation Report FY 2014

    SciTech Connect (OSTI)

    Gregory, L.

    2014-07-30

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.

  7. Solar Energy Technologies Program Newsletter - Fourth Quarter 2009

    SciTech Connect (OSTI)

    DOE Solar Energy Technologies Program

    2009-12-31

    The Fourth Quarter 2009 edition of the Solar Energy Technologies Program newsletter summarizes the activities for the past three months, funding opportunities, highlights from the national labs, and upcoming events.

  8. Fossil Energy Today - Fourth Quarter, 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Fossil Energy Today - Fourth Quarter, 2012 Topics In This Issue.... National Sequestration Education Center Opens in Illinois Environment, Security, Safety & Health in the Office of Fossil Energy AVESTAR Center Deploys 3-D Virtual Training System FE Teams Earn Secretary of Energy Achievement Awards NETL Organizes Coal and Power Training Course for State Department Risk Profiles Help Predict CO2 Storage Site Obstacles PDF icon Fossil Energy Today, Issue No. 8, Fourth Quarter, 2012 More

  9. Financial News for Major Energy Companies, Fourth Quarter 2005

    Gasoline and Diesel Fuel Update (EIA)

    Fourth Quarter 2005 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income

  10. Natural Gas Imports and Exports Fourth Quarter Report 2014 | Department of

    Energy Savers [EERE]

    Energy 4 Natural Gas Imports and Exports Fourth Quarter Report 2014 PDF icon Natural Gas Imports and Exports Fourth Quarter Report 2014 More Documents & Publications Natural Gas Imports and Exports First Quarter Report 2014 Natural Gas Imports and Exports Fourth Quarter Report 2013 Natural Gas Imports and Exports - Third Quarter Report 2014

  11. FY-2014 EM-EFCOG QA Project Plan_Final.pdf

    Office of Environmental Management (EM)

    Metrics and Targets | Department of Energy

    3 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2013 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2013, first quarter through fourth quarter. PDF icon FY 2013 1st Quarter Metrics PDF icon FY 2013 2nd Quarter Metrics PDF icon FY 2013 3rd Quarter Metrics PDF icon FY 2013 4th Quarter Metrics

  12. Natural gas imports and exports. Fourth quarter report, 1998

    SciTech Connect (OSTI)

    1998-12-31

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the fourth quarter of 1998 (October through December). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past 12 months. Attachment C shows volume and price information pertaining to gas imported on a short-term or spot market basis. Attachment D shows the gas exported on a short-term or spot market basis to Canada and Mexico.

  13. US Energy Industry Financial Developments, 1993 fourth quarter, April 1994

    SciTech Connect (OSTI)

    Not Available

    1994-04-14

    This report traces key financial trends in the US energy industry for the fourth quarter of 1993. Financial data (only available for publicly-traded US companies) are included in two broad groups -- fossil fuel production and rate-regulated electric utilities. All financial data are taken from public sources such as energy industry corporate reports and press releases, energy trade publications, and The Wall Street Journal`s Earnings Digest; return on equity is calculated from data available from Standard and Poor`s Compustat data service. Since several major petroleum companies disclose their income by lines of business and geographic area, these data are also presented in this report. Although the disaggregated income concept varies by company and is not strictly comparable to corporate income, relative movements in income by lines of business and geographic area are summarized as useful indicators of short-term changes in the underlying profitability of these operations. Based on information provided in 1993 fourth quarter financial disclosures, the net income for 82 petroleum companies -- including 18 majors -- was unchanged between the fourth quarter of 1992 and the fourth quarter of 1993. An 18-percent decline in crude oil prices resulted in a deterioration of the performance of upstream (oil and gas production) petroleum companies during the final quarter of 1993. However, prices for refined products fell much less than the price of crude oil, resulting in higher refined product margins and downstream (refining, marketing and transport) petroleum earnings. An increase in refined product demand also contributed to the rise in downstream income.

  14. Quarterly SSP Experiment Summary-Q1FY14 1

    National Nuclear Security Administration (NNSA)

    Q1FY14 1 Summary of Experiments Conducted in Support of Stockpile Stewardship First Quarter FY 2014 The U.S. Stockpile Stewardship Program is a robust program of scientific inquiry used to sustain and assess the nuclear weapons stockpile without the use of underground nuclear tests. The experiments carried out within the program are used in combination with Advanced Simulation and Computing (ASC) to continually assess the stockpile to ensure it is safe, secure, and effective. (For links to the

  15. The Savannah River Site's Groundwater Monitoring Program: Fourth quarter 1991

    SciTech Connect (OSTI)

    Rogers, C.D. )

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  16. Wind Program Newsletter: Fourth Quarter 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Wind Program Newsletter: Fourth Quarter 2011 University of Minnesota and the Department of Energy Celebrate New Wind Energy Research Station In the News Current R&D Funding Opportunities Recent Publications University of Minnesota and the Department of Energy Celebrate New Wind Energy Research Station The Department of Energy (DOE) and the University of Minnesota celebrated the installation of a 2.5-MW wind turbine at the University's new Eolos Wind Energy Research Station in Rosemount,

  17. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  18. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1:55 15 Meteorologist Briefing (La Nia) 27-30 Chris Karafotias 2:10 20 Secondary Revenue Outlook 31-33 Eric Federovitch, Alex Spain 2:30 10 Break 2:40 5 FY 2010 IT Update...

  19. Quarterly Business Review FY 2009 2nd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix - Detailed Power and Transmission Services Income Statements MAY 2009 QUARTERLY BUSINESS REVIEW 3 This information has been made publicly available by BPA on May 20, 2009...

  20. Wind Program Newsletter: Fourth Quarter 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Wind Program Newsletter: Fourth Quarter 2012 Letter from the Wind Program Director In the News Current R&D Funding Opportunities Recent Publications Letter from the Wind Program Director As the 2012 calendar year comes to a close and we look ahead to 2013, we at the Department of Energy have a unique opportunity to not only reflect on where we've been, but to look forward to where we're going. With the help of the Department of Energy, the wind energy industry has taken great strides this

  1. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Quarterly Business Review August 2, 2011 Follow Ups B O N N E V I L L E P O W E R A D M I N I S T R A T I O N AUGUST 2010 QUARTERLY BUSINESS REVIEW This information has been made...

  2. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November Quarterly Business Review Follow Ups Posted November 15, 2011 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NOVEMBER 2011 QUARTERLY BUSINESS REVIEW This...

  3. Letter from the Wind Program Director: Fourth Quarter 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Director: Fourth Quarter 2013 Letter from the Wind Program Director: Fourth Quarter 2013 January 6, 2014 - 10:00am Addthis Jose Zayas, Wind and Water Power Technologies Office Director This is an excerpt from the Fourth Quarter 2013 edition of the Wind Program R&D Newsletter. A new year always presents a great opportunity to reflect on past accomplishments and look forward to new opportunities. For the Wind Program, 2013 brought many accomplishments and significant milestones. The

  4. Idaho National Laboratory Quarterly Performance Analysis for the 2nd Quarter FY 2015

    SciTech Connect (OSTI)

    Mitchell, Lisbeth A.

    2015-04-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of events for the 2nd Qtr FY-15.

  5. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2nd Quarter Forecast. Unfortunately, any positive impact on the future end-of-year net revenue forecast is likely to be mitigated by continuing low market prices. - The Northwest...

  6. Environmental Compliance Performance Scorecard - First Quarter FY2010 |

    Energy Savers [EERE]

    Department of Energy 0 Environmental Compliance Performance Scorecard - First Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of

  7. Environmental Compliance Performance Scorecard - Third Quarter FY2010 |

    Energy Savers [EERE]

    Department of Energy 0 Environmental Compliance Performance Scorecard - Third Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of

  8. Microsoft Word - FY15 1st Quarter Transportation Report (Final)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    335 1 st QUARTER TRANSPORTATION REPORT FY2015 Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS) February 2015 United States Department of Energy National Nuclear Security Administration Nevada Field Office Las Vegas, Nevada Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government

  9. Idaho National Laboratory Quarterly Performance Analysis - 1st Quarter FY2015

    SciTech Connect (OSTI)

    Mitchell, Lisbeth A.

    2015-03-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 73 reportable events (27 from the 1St Qtr FY-15 and 46 from the prior three reporting quarters), as well as 38 other issue reports (including nine not reportable events and Significant Category A and B conditions reported during the1st Qtr FY-15) identified at INL during the past 12 months.

  10. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ups B O N N E V I L L E P O W E R A D M I N I S T R A T I O N AUGUST 2010 QUARTERLY BUSINESS REVIEW This information has been made publicly available by BPA on November 15, 2010...

  11. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ups 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N MAY 2010 QUARTERLY BUSINESS REVIEW This information has been made publicly available by BPA on May 11, 2010 and...

  12. FY 2016 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 6 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2016 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2016, first quarter through fourth quarter. PDF icon FY 2016 1st Quarter Metrics PDF icon FY 2016 2nd Quarter Metrics Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and

  13. Lessons Learned Quarterly Report 1st Quarter FY 1996

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEPA Success Stories: Articles from Department of Energy NEPA Lessons Learned Quarterly Reports 1996 Mar Hanford Tanks Public participation in NEPA process resulted in changes to the scope of the proposed project. The NEPA process resulted in enforceable mitigation commitments. 1997 Dec NPR Sale The NEPA process resulted in enforceable mitigation commitments for biological and cultural resources. 1999 Mar SPR Pipeline Integrating NEPA and the Section 404 permit processes proved efficient and

  14. The Savannah River Site Groundwater Monitoring Program Fourth Quarter 2000 (October thru December 2000)

    SciTech Connect (OSTI)

    Dukes, M.D.

    2001-08-02

    This report summarizes the Groundwater Monitoring Program conducted by SRS during fourth quarter 2000. It includes the analytical data, field data, data review, quality control, and other documentation for this program.

  15. NEVADA NATIONAL SECURITY SITE WASTE DISPOSAL OPERATIONS FY 2016 - QUARTER ONE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ONE DISPOSAL VOLUME REPORT DOE/NV/25946--2729 FY16 - Quarter 1 FY16 Cumulative FY16 - Quarter 1 FY16 Cumulative DOE APPROVED Waste Volume Volume DOE APPROVED Waste Volume Volume GENERATORS Type (Ft 3 ) (Ft 3 ) GENERATORS Type (Ft 3 ) (Ft 3 ) ABERDEEN PROVING GROUNDS (MD) LLW 1,122 1,122 NATIONAL SECURITY TECHNOLOGIES (NV) LLW 173 173 LLW 810 810 MIXED 6,447 6,447 CONSOLIDATED NUCLEAR SECURITY, LLC / Y-12 (TN) LLW 23,066 23,066 OAK RIDGE RESERVATION / UCOR (TN) LLW 12,681 12,681 DURATEK / ENERGY

  16. NEVADA NATIONAL SECURITY SITE WASTE DISPOSAL OPERATIONS FY 2016 - QUARTER TWO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TWO DISPOSAL VOLUME REPORT DOE/NV/25946--2779 FY16 - Quarter 2 FY16 Cumulative FY16 - Quarter 2 FY16 Cumulative DOE APPROVED Waste Volume Volume DOE APPROVED Waste Volume Volume GENERATORS Type (Ft 3 ) (Ft 3 ) GENERATORS Type (Ft 3 ) (Ft 3 ) ABERDEEN PROVING GROUNDS (MD) LLW 0 1,122 LLW 604 776 LLW 7,328 8,138 CNR 2,560 2,560 MIXED 6,344 12,791 CNRH 328 328 ARGONNE NATIONAL LAB (IL) LLW 1,063 1,063 NAVARRO (NV) LLW 224 224 BATTELLE ENERGY ALLIANCE (ID) LLW 8,465 8,465 NUCLEAR FUEL SERVICES (TN)

  17. Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report. Fourth quarter 1992 and 1992 summary

    SciTech Connect (OSTI)

    Thompson, C.Y.

    1993-03-01

    During fourth quarter 1992, samples from 18 groundwater monitoring wells of the AMB series at the Metallurgical Laboratory Hazardous Waste Management Facility were analyzed for certain heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. Six parameters exceeded final Primary Drinking Water Standards (PDWS) and the Savannah River Site Flag 2 criteria during the quarter. The results for fourth quarter 1992 are fairly consistent with the rest of the year`s data. Tetrachloroethylene exceeded the final PDWS in well AMB 4D only two of the four quarters; in the other three wells in which it was elevated, it was present at similar levels throughout the year. Trichloroethylene consistently exceeded its PDWS in wells AMB 4A, 4B, 4D, 5, and 7A during the year. Trichloroethylene was elevated in well AMB 6 only during third and fourth quarters and in well AMB 7 only during fourth quarter. Total alpha-emitting radium was above the final PDWS for total radium in well AMB 5 at similar levels throughout the year and exceeded the PDWS during one of the three quarters it was analyzed for (third quarter 1992) in well AMB 10B.

  18. Environmental Compliance Performance Scorecard – Fourth Quarter FY2013

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  19. Environmental Compliance Performance Scorecard- Fourth Quarter FY2014

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  20. Environmental Compliance Performance Scorecard – Fourth Quarter FY2012

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  1. Environmental Compliance Performance Scorecard – Fourth Quarter FY2009

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  2. Environmental Compliance Performance Scorecard – Fourth Quarter FY2011

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  3. Environmental Compliance Performance Scorecard – Fourth Quarter FY2010

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  4. Natural gas imports and exports, fourth quarter report 1999

    SciTech Connect (OSTI)

    2000-03-01

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports showing natural gas import and export activity. Companies are required to file quarterly reports. Attachments show the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent quarters, volumes and prices of gas purchased by long-term importers and exporters during the past 12 months, volume and price data for gas imported on a short-term or spot market basis, and the gas exported on a short-term or spot market basis to Canada and Mexico.

  5. NEVADA NATIONAL SECURITY SITE WASTE DISPOSAL OPERATIONS FY 2015 - QUARTER FOUR

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    QUARTER FOUR DISPOSAL VOLUME REPORT FY15 - Quarter 4 FY15 Cumulative FY15 - Quarter 4 FY15 Cumulative DOE APPROVED Waste Volume Volume DOE APPROVED Waste Volume Volume GENERATORS Type (Ft 3 ) (Ft 3 ) GENERATORS Type (Ft 3 ) (Ft 3 ) ABERDEEN PROVING GROUNDS (MD)LLW 4,926 7,642 LLW 111 1,491 LLW 6,430 27,485 MIXED 19 347 MIXED 16,197 76,337 CNR 1,383 2,870 ARGONNE NATIONAL LAB (IL) LLW 0 3,346 CNRH 493 821 LLW 14,761 27,732 NAVARRO LLW 16 7,837 CNR 1,271 3,814 BROOKHAVEN NATIONAL LAB (NY) LLW

  6. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  7. FINAL-3RD-QUARTER-FY-2013-SCORECARD-01-31-14.xlsx

    Office of Environmental Management (EM)

    3RD-QUARTER-FY-2013-SCORECARD-01-31-14.xlsx Page 1 of 76 EA & PEA MILESTONES MET DURING QUARTER (04/2013 - 06/2013) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (07/2013 - 06/2014) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN N / A (0 / 0) N / A (0 /

  8. Wind Program R&D Newsletter: Fourth Quarter 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R&D Newsletter: Fourth Quarter 2013 Wind Program R&D Newsletter: Fourth Quarter 2013 This archived edition of the U.S. Department of Energy Wind Program R&D Newsletter, which was published on January 6, 2014, provides information about the program's research and development projects, its accomplishments, and funding opportunities. Letter from the Wind Program Director In the News Current R&D Funding Opportunities Publications Letter from the Wind Program Director Jose Zayas A new

  9. The Savannah River Site`s Groundwater Monitoring Program: Fourth quarter 1991

    SciTech Connect (OSTI)

    Rogers, C.D.

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  10. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1988

    SciTech Connect (OSTI)

    Not Available

    1989-12-31

    The Environmental Monitoring Group of the Health Protection Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1988 (October--December), routine sampling of monitoring wells and drinking water locations was performed. The drinking water samples were collected from Savannah River Site (SRS) drinking water systems supplied by wells. Two sets of flagging criteria were established in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. The drinking water samples were analyzed for radioactive constituents.

  11. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1992

    SciTech Connect (OSTI)

    Not Available

    1993-05-17

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the fourth quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities; and serves as an official document of the analytical results.

  12. Mixed waste management facility groundwater monitoring report. Fourth quarter 1995 and 1995 summary

    SciTech Connect (OSTI)

    1996-03-01

    During fourth quarter 1995, seven constituents exceeded final Primary Drinking Water Standards (PDWS) in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility. No constituents exceeded final PDWS in samples from the upgradient monitoring wells. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. Chloroethene, gross alpha, lead, mercury, and tetrachloroethylene also exceeded final PDWS in one or more wells. Elevated constituents were found in numerous Aquifer Zone IIB{sub 2} (Water Table) and Aquifer Zone IIB{sub 1} (Barnwell/McBean) wells and in three Aquifer Unit IIA (Congaree) wells. The groundwater flow directions and rates in the three hydrostratigraphic units were similar to those of previous quarters.

  13. PBL FY 2003 Second Quarter Review Forecast of Generation Accumulated...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the rate period (i.e., FY 2002-2006), a forecast of that end-of-year Accumulated Net Revenue (ANR) will be completed. If the ANR at the end of the forecast year falls below the...

  14. ARM Climate Research Facility Quarterly Value-Added Product Report, Fourth Quarter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman October 2015 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

  15. Results For The Fourth Quarter 2014 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

    SciTech Connect (OSTI)

    Crawford, C.

    2015-09-30

    This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2014 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  16. INL FY2014 1st Quarterly Performance Analysis

    SciTech Connect (OSTI)

    Loran Kinghorn

    2014-07-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 76 occurrence reports and over 16 other deficiency reports (including not reportable events) identified at the INL during the period of October 2013 through December 2013. Battelle Energy Alliance (BEA) operates the INL under contract DE AC 07 051D14517

  17. 4th Quarter Transportation Report FY 2014: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    SciTech Connect (OSTI)

    Gregory, Louis

    2014-12-02

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. There was one shipment of two drums sent for offsite treatment and disposal. This report summarizes the 4th quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014.

  18. RESULTS FOR THE FOURTH QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Bannochie, C.

    2012-01-31

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

  19. Sanitary Landfill Groundwater Monitoring Report, Fourth Quarter 1999 and 1999 Summary

    SciTech Connect (OSTI)

    Chase, J.

    2000-03-13

    A maximum of thirty eight-wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill Area at the Savannah River Site (SRS). These wells are sampled quarterly to comply with the South Carolina Department of Health and Environmental Control Domestic Water Permit DWP-087A and as part of the SRS Groundwater Monitoring Program. Iron (Total Recoverable), Chloroethene (Vinyl Chloride) and 1,1-Dichloroethane were the most widespread constituents exceeding the Final Primary Drinking Water Standards during 1999. Trichloroethylene, 1,1-Dichloroethylene, 1,2-Dichloroethane, 1,4-Dichlorobenzene, Aluminum (Total Recoverable), Benzene, cis-1,2-Dichloroethylene, Dichlorodifluoromethane, Dichloromethane (Methylene Chloride), Gross Alpha, Mercury (Total Recoverable), Nonvolatile Beta, Tetrachloroethylene, Total Organic Halogens, Trichlorofluoromethane, Tritium also exceeded standards in one or more wells. The groundwater flow direction in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill is to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 144.175 ft/year during first quarter 1999 and 145.27 ft/year during fourth quarter 1999.

  20. The AMTEX Partnership. Third quarterly report, FY 1995

    SciTech Connect (OSTI)

    Lemon, D.K.; Quisenberry, R.K.

    1995-06-01

    Key activities for the quarter were the initiation of tactical work on the OPCon Project, development of a draft of the AMTEX Policies and Procedures document, and a meeting of the Industry Technical Advisory Committee. A significant milestone was reached when a memorandum of understanding was signed between the DOE and The Department of Commerce. The agreement signified the official participation of the National Institute of Standards and Technology on the Demand Activated Manufacturing Architecture (DAMA) project in AMTEX. Project accomplishments are given for: computer-aided manufacturing, cotton biotechnology, DAMA, electronic embedded fingerprints, rapid cutting, sensors for agile manufacturing, and textile resource conservation.

  1. Quarterly Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2009 Federal Columbia River Power System (FCRPS) FY 2009 FIRST QUARTER REVIEW Projection for FY 2009 Net Revenues and Reserves A B C D FY 2008 Audited Actuals without FAS 133 &...

  2. Idaho National Laboratory Quarterly Performance Analysis - 3rd Quarter FY2014

    SciTech Connect (OSTI)

    Lisbeth A. Mitchell

    2014-09-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other non-reportable issues identified at INL from July 2013 through June 2014.

  3. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1990

    SciTech Connect (OSTI)

    Not Available

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  4. Renewable Energy Finance Tracking Initiative (REFTI): Snapshot of Recent Geothermal Financing Terms, Fourth Quarter 2009 - Second Half 2011

    SciTech Connect (OSTI)

    Lowder, T.; Hubbell, R.; Mendelsohn, M.; Cory, K.

    2012-09-01

    This report is a review of geothermal project financial terms as reported in the National Renewable Energy Laboratory's Renewable Energy Finance Tracking Initiative (REFTI). The data were collected over seven analysis periods from the fourth quarter (Q4) of 2009 to the second half (2H) of 2011.

  5. 2012-12-06 Quarterly SSP Experiment Summary-FY12-4Q 1

    National Nuclear Security Administration (NNSA)

    2-12-06 Quarterly SSP Experiment Summary-FY12-4Q 1 Summary of Experiments Conducted in Support of Stockpile Stewardship October 2012 The U.S. Stockpile Stewardship Program is a robust program of scientific inquiry used to sustain and assess the nuclear weapons stockpile without the use of underground nuclear tests. The experiments carried out within the program are used in combination with Advanced Simulation and Computing (ASC) to continually assess the stockpile to ensure it is safe, secure,

  6. Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter

    SciTech Connect (OSTI)

    Lisbeth A. Mitchell

    2013-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information” requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

  7. Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014

    SciTech Connect (OSTI)

    Lisbeth A. Mitchell

    2014-06-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

  8. FY12 Quarter 3 Computing Utilization Report LANL

    SciTech Connect (OSTI)

    Wampler, Cheryl L. [Los Alamos National Laboratory; McClellan, Laura Ann [Los Alamos National Laboratory

    2012-07-25

    DSW continues to dominate the capacity workload, with a focus in Q3 on common model baselining runs in preparation for the Annual Assessment Review (AAR) of the weapon systems. There remains unmet demand for higher fidelity simulations, and for increased throughput of simulations. Common model baselining activities would benefit from doubling the resolution of the models and running twice as many simulations. Capacity systems were also utilized during the quarter to prepare for upcoming Level 2 milestones. Other notable DSW activities include validation of new physics models and safety studies. The safety team used the capacity resources extensively for projects involving 3D computer simulations for the Furrow series of experiments at DARHT (a Level 2 milestone), fragment impact, surety theme, PANTEX assessments, and the 120-day study. With the more than tripling of classified capacity computing resources with the addition of the Luna system and the safety team's imminent access to the Cielo system, demand has been met for current needs. The safety team has performed successful scaling studies on Luna up to 16K PE size-jobs with linear scaling, running the large 3D simulations required for the analysis of Furrow. They will be investigating scaling studies on the Cielo system with the Lustre file system in Q4. Overall average capacity utilization was impacted by negative effects of the LANL Voluntary Separation Program (VSP) at the beginning of Q3, in which programmatic staffing was reduced by 6%, with further losses due to management backfills and attrition, resulting in about 10% fewer users. All classified systems were impacted in April by a planned 2 day red network outage. ASC capacity workload continues to focus on code development, regression testing, and verification and validation (V&V) studies. Significant capacity cycles were used in preparation for a JOWOG in May and several upcoming L2 milestones due in Q4. A network transition has been underway on the unclassified networks to increase access of all ASC users to the unclassified systems through the Yellow Turquoise Integration (YeTI) project. This will help to alleviate the longstanding shortage of resources for ASC unclassified code development and regression testing, and also make a broader palette of machines available to unclassified ASC users, including PSAAP Alliance users. The Moonlight system will be the first capacity resource to be made available through the YETI project, and will make available a significant increase in cycles, as well as GPGPU accelerator technology. The Turing and Lobo machines will be decommissioned in the next quarter. ASC projects running on Cielo as part of the CCC-3 include turbulence, hydrodynamics, burn, asteroids, polycrystals, capability and runtime performance improvements, and materials including carbon and silicone.

  9. Subsurface Biogeochemical Research FY11 Second Quarter Performance Measure

    SciTech Connect (OSTI)

    Scheibe, Timothy D.

    2011-03-31

    The Subsurface Biogeochemical Research (SBR) Long Term Measure for 2011 under the Performance Assessment Rating Tool (PART) measure is to "Refine subsurface transport models by developing computational methods to link important processes impacting contaminant transport at smaller scales to the field scale." The second quarter performance measure is to "Provide a report on computational methods linking genome-enabled understanding of microbial metabolism with reactive transport models to describe processes impacting contaminant transport in the subsurface." Microorganisms such as bacteria are by definition small (typically on the order of a micron in size), and their behavior is controlled by their local biogeochemical environment (typically within a single pore or a biofilm on a grain surface, on the order of tens of microns in size). However, their metabolic activity exerts strong influence on the transport and fate of groundwater contaminants of significant concern at DOE sites, in contaminant plumes with spatial extents of meters to kilometers. This report describes progress and key findings from research aimed at integrating models of microbial metabolism based on genomic information (small scale) with models of contaminant fate and transport in aquifers (field scale).

  10. RESULTS FOR THE FOURTH QUARTER TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Reigel, M.; Bibler, N.

    2010-01-27

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, the DDA (Deliquification, Dissolution, and Adjustment) process, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are listed in the current Saltstone WAC. SRS Liquid Waste Operations (LWO) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2009 Fourth Quarter samples collected from Tank 50 on October 2, 2009 and discusses those results in further detail than the previously issued results report. This report details the chemical and radionuclide contaminant results for the characterization of the 2009 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (3) The reported detection limits for {sup 59}Ni and {sup 94}Nb are above the requested limits from Reference 4. However, they are each below the limits established in Reference 3. (4) The reported detection limit for isopropanol is greater than the requested limit from Table 4 of the WAC. (5) The reported detection limits for {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 4. However, they are below the limits established in Reference 3. (6) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

  11. RESULTS FOR THE FOURTH QUARTER 2010 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Reigel, M.

    2011-02-22

    This report details the chemical and radionuclide contaminant results for the characterization of the 2010 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limits for {sup 94}Nb, {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 2. However, they are below the limits established in Reference 3. (3) There is an estimated concentration of trimethylbenzene (2.25 mg/L). This is not a WAC analyte, but it is the first time this organic compound has been detected in a quarterly WAC sample from Tank 50. (4) The reported detection limit for Norpar 13 is greater than the limit from Table 4 and Attachment 8.2 of the WAC. (5) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (6) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

  12. RESULTS FOR THE FOURTH QUARTER 2013 TANK 50 WAC SLURRY SAMPLE CHEMICAL AND RADIONUCLIDE CONTAMINANTS

    SciTech Connect (OSTI)

    Bannochie, C.

    2014-04-01

    This report details the chemical and radionuclide contaminant results for the characterization of the 2013 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report:  SRR WAC targets or limits were met for all analyzed chemical and radioactive contaminants unless noted in this section.  {sup 59}Ni, {sup 94}Nb, {sup 247}Cm, {sup 249}Cf, and {sup 251}Cf are above the requested SRR target concentrations. However, they are below the detection limits established by SRNL.  Norpar 13 and Isopar L have higher detection limits compared with the Saltstone WAC. The data provided in this report is based upon the concentrations in the sub-sample, and due to the limited solubility of these materials in aqueous solution, may not represent the concentrations of the analytes in Tank 50.  The low insoluble solids content increases the measurement uncertainty for insoluble species. The semivolatile organic analysis (SVOA) method employed in the measurement of Norpar 13 and tributyl phosphate (TBP) has resulted in the erroneous reporting of a variety of small chain alcohols, including 4-methyl-3-hexanol and 5-methyl-3-hexanol, in previous quarterly sample reports. It has now been determined that these alcohols are an artifact of the sample preparation. Further work is being conducted in SRNL to delineate the conditions that produce these alcohols, and these findings will be reported separately.

  13. FY 2014 Q4 Metrics Report 2014-11-06.xlsx

    Energy Savers [EERE]

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics No. Contract/Project Management Performance Metrics FY 2014 Target FY 2014 Pre- & Post- CAP* Actual Comment 1 Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 67% Pre-CAP 76% Post-CAP Based on 3-year rolling period (FY12 to FY14). TPC is Total Project Cost. No. FY 2014 Target FY 2014 4th Qtr Actual 2 95% 89% 3 95% 94% 4 90%

  14. Results For The Fourth Quarter 2012 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

    SciTech Connect (OSTI)

    Bannochie, C. J.

    2013-02-05

    This report details the chemical and radionuclide contaminant results for the characterization of the 2012 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC).Information from this characterization will be used by Waste Solidification Engineering (WSE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: The concentration of the reported chemical and radioactive contaminants were less than their respective WAC Limits and Targets, unless noted in this section; Norpar 13 and Isopar L have higher detection limits compared with the Saltstone WAC. The data provided in this report is based upon the concentrations in the sub-sample, and due to the limited solubility in aqueous solution, may not represent the concentrations of the analytes in Tank 50; Diisooctyl adipate (or diisooctyl hexanedioate) and 5-methyl-3-hexanol, plasticizers, were measured at 1.30E+00 mg/L and 3.00E+00 mg/L, respectively, in one of two replicate measurements conducted on an at-depth sample. The organic analysis of the at-depth sample was conducted at the request of SRR. These analytes were below the detection limits for the surface sample; and, The low insoluble solids content increases the measurement uncertainty for insoluble species.

  15. Atmospheric Properties from the 2006 Niamey Deployment and Climate Simulation with a Geodesic Grid Coupled Climate Model Fourth Quarter 2008

    SciTech Connect (OSTI)

    JH Mather; DA Randall; CJ Flynn

    2008-09-30

    In 2008, the Atmospheric Radiation Measurement (ARM) Program and the Climate Change Prediction Program (CCPP) have been asked to produce joint science metrics. For CCPP, the metrics will deal with a decade-long control simulation using geodesic grid-coupled climate model. For ARM, the metrics will deal with observations associated with the 2006 deployment of the ARM Mobile Facility (AMF) to Niamey, Niger. Specifically, ARM has been asked to deliver data products for Niamey that describe cloud, aerosol, and dust properties. The first quarter milestone was the initial formulation of the algorithm for retrieval of these properties. The second quarter milestone included the time series of ARM-retrieved cloud properties and a year-long CCPP control simulation. The third quarter milestone included the time series of ARM-retrieved aerosol optical depth and a three-year CCPP control simulation. This final fourth quarter milestone includes the time-series of aerosol and dust properties and a decade-long CCPP control simulation.

  16. FY 2012 Fourth Quarter Report (As of 10-26-2012).xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    81.7 105.9 86.8 5 86.8 5 4. END OF YEAR FINANCIAL RESERVES 3 1,006.0 965.0 1,022.2 5 1,022.2 5 5. BPA ACCRUED CAPITAL EXPENDITURES 4 798.0 876.4 663.6 663.6 Footnotes 1...

  17. Enclosure - FY 2015 Q4 Metrics Report 2015-11-02.xlsx

    Energy Savers [EERE]

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics No. Contract/Project Management Performance Metrics FY 2015 Target Comment No. 2 3 4 5 6 7 1 Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% FY13-FY15: 40 completions through 4th Qtr. CD-4: Critical Decision-4, Approve Start of Operations/Project Completion. FY13-FY15: 4 completions through 4th Qtr. Based on 3-year rolling

  18. FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports

    SciTech Connect (OSTI)

    1990-11-01

    This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

  19. Direct conversion of light hydrocarbon gases to liquid fuel. Quarterly technical status report No. 31 for fourth quarter FY 1991

    SciTech Connect (OSTI)

    Foral, M.J.

    1991-12-31

    The objective of this program is to investigate the direct conversion of light gaseous hydrocarbons, such as those produced during Fischer-Tropsch synthesis or as a product of gasification, to liquid transportation fuels via a partial oxidation process. The process will be tested in an existing pilot plant to obtain credible mass balances. Specific objectives to be met include determination of optimal process conditions, investigation of various processing options (e.g. feed injection, product quench, and recycle systems), and evaluation of an enhanced yield thermal/catalytic system. Economic evaluation of the various options will be performed as experimental data become available.

  20. Sanitary Landfill Groundwater Monitoring Report - Fourth Quarter 1998 and 1998 Summary

    SciTech Connect (OSTI)

    Chase, J.

    1999-04-09

    A maximum of fifty-three wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled quarterly to comply with the South Carolina Department of Health and Environmental Control Domestic Water permit and as part of the SRS Groundwater Monitoring Program.

  1. 3rd Quarter Transportation Report FY 2014: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    SciTech Connect (OSTI)

    Gregory, Louis

    2014-09-20

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 3rd quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS;  Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.

  2. High efficiency shale oil recovery. Fourth quarterly report, October 1, 1992--December 31, 1992

    SciTech Connect (OSTI)

    Adams, D.C.

    1992-12-31

    The overall project objective is to demonstrate the high efficiency of the Adams Counter-Current shale oil recovery process. The efficiency will first be demonstrated on a small scale, in the current phase, after which the demonstration will be extended to the operation of a small pilot plant. Thus the immediate project objective is to obtain data on oil shale retorting operations in a small batch rotary kiln that will be representative of operations in the proposed continuous process pilot plant. Although an oil shale batch sample is sealed in the batch kiln from the start until the end of the run, the process conditions for the batch are the same as the conditions that an element of oil shale would encounter in a continuous process kiln. Similar chemical and physical (heating, mixing) conditions exist in both systems. The two most important data objectives in this phase of the project are to demonstrate (1) that the heat recovery projected for this project is reasonable and (2) that an oil shale kiln will run well and not plug up due to sticking and agglomeration. The following was completed and is reported on this quarter: (1) A software routine was written to eliminate intermittently inaccurate temperature readings. (2) We completed the quartz sand calibration runs, resolving calibration questions from the 3rd quarter. (3) We also made low temperature retorting runs to identify the need for certain kiln modifications and kiln modifications were completed. (4) Heat Conductance data on two Pyrolysis runs were completed on two samples of Occidental oil shale.

  3. 1st Quarter Transportation Report FY 2015: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    SciTech Connect (OSTI)

    Gregory, Louis

    2015-02-20

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 1st quarter of Fiscal Year (FY) 2015 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report include minor volumes of non-radioactive classified waste/material that were approved for disposal (non-radioactive classified or nonradioactive classified hazardous). Volume reports showing cubic feet generated using the Low-Level Waste Information System may vary slightly due to rounding conventions for volumetric conversions from cubic meters to cubic feet.

  4. F-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1

    SciTech Connect (OSTI)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the second half of 1993, notably aluminum, iodine-129, and zinc. The elevated constituents are found primarily in Aquifer Zone 2B{sub 2} and Aquifer Zone 2B{sub 1} wells. However, several Aquifer Unit 2A wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Water-level maps indicate that the groundwater flow rates and directions at the FASB have remained relatively constant since the basins ceased to be active in 1988.

  5. Microsoft Word - ACRF4thQuarterFY09 draft_nb__sal.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly ... 2009, DOESC-ARMP-09-016 1 Atmospheric Radiation Measurement Program Climate Research ...

  6. Environmental Compliance Performance Scorecard ¬タモ First Quarter FY2011

    Office of Environmental Management (EM)

    1-SCORECARD-05-18-11.xlsx Page 1 of 71 EA & PEA MILESTONES MET DURING QUARTER (10/2010 - 12/2010) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (01/2011 - 12/2011) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (1 / 1) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) 1 previous Non-Impacting State NOV (with minor

  7. Environmental Compliance Performance Scorecard ¬タモ First Quarter FY2012

    Office of Environmental Management (EM)

    2-SCORECARD-05-09-12.xlsx Page 1 of 88 EA & PEA MILESTONES MET DURING QUARTER (10/2011 - 12/2011) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (01/2012 - 12/2012) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (1 / 1) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A SA

  8. Environmental Compliance Performance Scorecard ¬タモ Second Quarter FY2011

    Office of Environmental Management (EM)

    1-SCORECARD-06-29-11.xlsx Page 1 of 83 EA & PEA MILESTONES MET DURING QUARTER (01/2011 - 03/2011) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (04/2011 - 03/2012) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) 1 previous Non-Impacting State NOV (with minor

  9. Environmental Compliance Performance Scorecard ¬タモ Second Quarter FY2012

    Office of Environmental Management (EM)

    2-SCORECARD-09-11-12.xlsx Page 1 of 88 EA & PEA MILESTONES MET DURING QUARTER (01/2012 - 03/2012) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (04/2012 - 03/2013) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A SA

  10. Environmental Compliance Performance Scorecard ¬タモ Third Quarter FY2011

    Office of Environmental Management (EM)

    1-SCORECARD-09-21-11 Page 1 of 1 This scorecard has been prepared for analysis purposes. Every effort will be made to comply with all applicable environmental legal obligations, while also maintaining essential functions to protect human health, the environment, and national security. EA & PEA MILESTONES MET DURING QUARTER (04/2011 - 06/2011) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (07/2011 - 06/2012) / TOTAL FOUR QUARTERS EA & PEA

  11. FINAL-2ND-QUARTER-FY-2013-SCORECARD-12-16-13.xlsx

    Office of Environmental Management (EM)

    3-SCORECARD-12-16-13.xlsx Page 1 of 85 EA & PEA MILESTONES MET DURING QUARTER (01/2013 - 03/2013) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (04/2013 - 03/2014) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (0 / 0) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A SA

  12. FINAL-4TH-QUARTER-FY-2012-SCORECARD-04-10-13.xlsx

    Office of Environmental Management (EM)

    2-SCORECARD-04-10-13.xlsx Page 1 of 90 EA & PEA MILESTONES MET DURING QUARTER (07/2012 - 09/2012) / TOTAL QUARTER EA & PEA MILESTONES ON SCHEDULE EA & PEA MILESTONES NEXT FOUR QUARTERS (10/2012 - 09/2013) / TOTAL FOUR QUARTERS EA & PEA MILESTONES Argonne (ANL) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A N / A Brookhaven (BNL) GREEN GREEN (0 / 0) GREEN (1 / 1) N / A N / A N / A Carlsbad / Waste Isolation Pilot Plant (CBFO / WIPP) GREEN N / A (0 / 0) N / A (0 / 0) N / A N / A SA

  13. SITE-LEVEL SUMMARY (2Q) of FINAL-2ND-QUARTER-FY-2015-SCORECARD...

    Office of Environmental Management (EM)

    quarter. N A (0 0) N A (0 0) N A N A SA Completed Energy Technology Engineering Center (ETEC) GREEN N A (0 0) N A (0 0) N A N A EIS Idaho (INL) One new ...

  14. FY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2008 FOIA - Request Log Closed/ No. Dated Date HQ ~~- l Date Rec'd or Dir. Finalized 001 02/01/08 03/11/08 Transfer ':'11 correspondence: m~mora~da, documents, reports, recor~s, statement~, ~~dits, IV' IA AI Ir"I:9 r._.-._ I." Vvl I 11VU "UII' n\,,( lists of names, applications, diskettes, ietters, calendars or diary logs, facsimile logs, call sheets, tape recordings, video. movie recordings, notes, chars, photographs, electronic mail and other documents sand things that refer

  15. Quarterly SSP Experiment Summary-FY13-4Q final 1

    National Nuclear Security Administration (NNSA)

    FY13-4Q final 1 Summary of Experiments Conducted in Support of Stockpile Stewardship October 2013 The U.S. Stockpile Stewardship Program is a robust program of scientific inquiry used to sustain and assess the nuclear weapons stockpile without the use of underground nuclear tests. The experiments carried out within the program are used in combination with Advanced Simulation and Computing (ASC) to continually assess the stockpile to ensure it is safe, secure, and effective. (For links to the ASC

  16. Directives Quarterly Updates - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Quarterly Updates by Diane Johnson Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly. FY2016 FY 16, Q2 - January through March 2016 FY2015 FY15, Q1 - October through December 2014 FY15, Q3 - April through June 2015 FY15, Q4 - July through September 2015 FY 2014 FY14, Q1 - October through December 2013 FY14, Q2 - January through March 2014 FY14, Q3 - April

  17. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 First Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Sanborn, Scott E.; Simmons, Kevin L.; Mathur, Raj N.; Sangid, Michael D.; Jin, Xiaoshi; Costa, Franco; Gandhi, Umesh N.; Mori, Steven; Tucker III, Charles L.

    2014-02-19

    The CRADA between PNNL, Autodesk, Toyota and Magna has been effective since October 28th, 2013. The whole team including CRADA and subcontract partners kicked off the project technically on November 1st, 2013. This report describes work performed during the first quarter of FY 2014. The following technical progresses have been made toward project milestones: 1) The project kickoff meeting was organized at PlastiComp, Inc. in Winona on November 13th, 2013 involving all the project partners. During this meeting the research plan and Gantt chart were discussed and refined. The coordination of the research activities among the partners was also discussed to ensure that the deliverables and timeline will be met. 2) Autodesk delivered a research version of ASMI to PNNL for process modeling using this tool under the project. PNNL installed this research version on a PNNL computer and tested it. Currently, PNNL is using ASMI to prepare the models for PlastiComp plaques. 3) PlastiComp has compounded long carbon-fiber reinforced polypropylene and polyamide 6,6 compounds for rheological and thermal characterization tests by the Autodesk laboratories in Melbourne, Australia. 4) Initial mold flow analysis was carried out by PlastiComp to confirm that the 3D complex part selected by Toyota as a representative automotive part is moldable. 5) Toyota, Magna, PlastiComp and PNNL finalized the planning for molding the Toyota 3D complex part. 6) Purdue University worked with PNNL to update and specify the test matrix for characterization of fiber length/orientation. 7) Purdue University developed tools to automate the data collection and analysis of fiber length and orientation measurements. 8) Purdue University designed and specified equipment to replace the need for equipment using the technology established by the University of Leeds at General Motors.

  18. EMSL Quarterly Highlights Report: 2nd Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-05-04

    This report outlines the highlights, staff and user accomplishments, and publications that occured during FY09, 2nd quarter at EMSL.

  19. Quarterly Report for LANL Activities: FY12-Q2 National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program

    SciTech Connect (OSTI)

    Pawar, Rajesh J.

    2012-04-17

    This report summarizes progress of LANL activities related to the tasks performed under the LANL FWP FE102-002-FY10, National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program. This FWP is funded through the American Recovery and Reinvestment Act (ARRA). Overall, the NRAP activities are focused on understanding and evaluating risks associated with large-scale injection and long-term storage of CO{sub 2} in deep geological formations. One of the primary risks during large-scale injection is due to changes in geomechanical stresses to the storage reservoir, to the caprock/seals and to the wellbores. These changes may have the potential to cause CO{sub 2} and brine leakage and geochemical impacts to the groundwater systems. While the importance of these stresses is well recognized, there have been relatively few quantitative studies (laboratory, field or theoretical) of geomechanical processes in sequestration systems. In addition, there are no integrated studies that allow evaluation of risks to groundwater quality in the context of CO{sub 2} injection-induced stresses. The work performed under this project is focused on better understanding these effects. LANL approach will develop laboratory and computational tools to understand the impact of CO{sub 2}-induced mechanical stress by creating a geomechanical test bed using inputs from laboratory experiments, field data, and conceptual approaches. The Geomechanical Test Bed will be used for conducting sensitivity and scenario analyses of the impacts of CO{sub 2} injection. The specific types of questions will relate to fault stimulation and fracture inducing stress on caprock, changes in wellbore leakage due to evolution of stress in the reservoir and caprock, and the potential for induced seismicity. In addition, the Geomechanical Test Bed will be used to investigate the coupling of stress-induced leakage pathways with impacts on groundwater quality. LANL activities are performed under two tasks: (1) develop laboratory and computational tools to understand CO{sub 2}-induced mechanical impacts and (2) use natural analog sites to determine potential groundwater impacts. We are using the Springerville-St. John Dome as a field site for collecting field data on CO{sub 2} migration through faults and groundwater impacts as well as developing and validating computational models. During the FY12 second quarter we have been working with New England Research Company to construct a tri-axial core-holder. We have built fluid control system for the coreflood system that can be ported to perform in-situ imaging of core. We have performed numerical simulations for groundwater impacts of CO{sub 2} and brine leakage using the reservoir model for Springerville-St John's Dome site. We have analyzed groundwater samples collected from Springerville site for major ion chemistry and isotopic composition. We are currently analyzing subsurface core and chip samples acquired for mineralogical composition.

  20. Predictive Engineering Tools for Injection-molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 Third Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Sanborn, Scott E.; Mathur, Raj N.; Sharma, Bhisham; Sangid, Michael D.; Wang, Jin; Jin, Xiaoshi; Costa, Franco; Gandhi, Umesh N.; Mori, Steven; Tucker III, Charles L.

    2014-08-15

    This report describes the technical progresses made during the third quarter of FY 2014: 1) Autodesk introduced the options for fiber inlet condition to the 3D solver. These options are already available in the mid-plane/dual domain solver. 2) Autodesk improved the accuracy of 3D fiber orientation calculation around the gate. 3) Autodesk received consultant services from Prof. C.L. Tucker at the University of Illinois on the implementation of the reduced order model for fiber length, and discussed with Prof. Tucker the methods to reduce memory usage. 4) PlastiComp delivered to PNNL center-gated and edge-fan-gated 20-wt% to 30-wt% LCF/PP and LCF/PA66 (7”x7”x1/8”) plaques molded by the in-line direct injection molding (D-LFT) process. 5) PlastiComp molded ASTM tensile, flexural and impact bars under the same D-LFT processing conditions used for plaques for Certification of Assessment and ascertaining the resultant mechanical properties. 6) Purdue developed a new polishing routine, utilizing the automated polishing machine, to reduce fiber damage during surface preparation. 7) Purdue used a marker-based watershed segmentation routine, in conjunction with a hysteresis thresholding technique, for fiber segmentation during fiber orientation measurement. 8) Purdue validated Purdue’s fiber orientation measurement method using the previous fiber orientation data obtained from the Leeds machine and manually measured data by the University of Illinois. 9) PNNL conducted ASMI mid-plane analyses for a 30wt% LCF/PP plaque and compared the predicted fiber orientations with the measured data provided by Purdue University at the selected locations on this plaque. 10) PNNL put together the DOE 2014 Annual Merit Review (AMR) presentation with the team and presented it at the AMR meetings on June 17, 2014. 11) PNNL built ASMI dual domain models for the Toyota complex part and commenced mold filling analyses of the complex part with different wall thicknesses in order to support part molding. 12) Toyota and Magna discussed with PNNL on tool modification for molding the complex part. Toyota sent the CAD files of the complex part to PNNL to build ASMI models of the part for mold filling analysis to provide guidance to tooling and part molding.

  1. FY 2003 Generation Audited Accumlated Net Revenues, March 2004

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3rd Quarter Review Forecast FY 2003 Actual Results 1 FY 2000 PBL Actual Modified Net Revenue 252 252 2 Energy Northwest Debt Service Adjustment for FY 2000 (82) (82) 3 SFAS...

  2. Natural Gas Imports and Exports - Quarterly Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Natural Gas Imports and Exports - Quarterly Reports Natural Gas Imports and Exports - Quarterly Reports May 11, 2016 Natural Gas Imports and Exports Fourth Quarter Report 2015 ...

  3. Microsoft Word - ARM1stQuarterFY10 draft_DOE-SC-ARM-10-001.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly ... DOESC-ARM-10-001 Atmospheric Radiation Measurement Program Climate Research Facility ...

  4. Microsoft Word - ACRF3rdQuarterFY09_DOE_SC_ARM_P_09_011.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly ... Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement ...

  5. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2015 First Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Fifield, Leonard S.; Kijewski, Seth A.; Sangid, Michael D.; Wang, Jin; Jin, Xiaoshi; Costa, Franco; Tucker, III, Charles L.; Mathur, Raj N.; Gandhi, Umesh N.; Mori, Steven

    2015-01-29

    During the first quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk delivered a new research version of ASMI to PNNL. This version includes the improved 3D fiber orientation solver, and the reduced order model (ROM) for fiber length distribution using the proper orthogonal decomposition (POD) implemented in the mid-plane, dual-domain and 3D solvers. 2) Autodesk coordinated a conference paper with PNNL reporting ASMI mid-plane fiber orientation predictions compared with the measured data for two PlastiComp plaques. This paper was accepted for presentation at the 2015 Society for Plastics Engineers (SPE) ANTEC conference. 3) The University of Illinois (Prof. Tucker) assisted team members from Purdue with fiber orientation measurement techniques, including interpretation of off-axis cross sections. 4) The University of Illinois assisted Autodesk team members with software implementation of the POD approach for fiber length modeling, and with fiber orientation modeling. 5) The University of Illinois co-authored in the SPE ANTEC paper, participated with the team in discussions of plaque data and model results, and participated in the definition of go/no-go experiments and data. 6) Purdue University (Purdue) conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP center-gated, fast-fill 50wt% LCF/PA66 edge-gated and fast-fill 50wt% LCF/PA66 center-gated plaques, and delivered the fiber orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. However, the data for the fast-fill 50wt% LCF/PA66 edge-gated plaque exhibited unusual variations and could not be used for the model validation. Purdue will re-measure fiber orientation for this plaque. 7) Based on discussions with the University of Illinois Purdue explained the ambiguity in the measurements of the fiber orientation components. 8) PNNL discussed with team members to establish a go/no-go decision plan for the project and submitted the established plan to DOE. 9) PNNL performed ASMI mid-plane analyses for the fast-fill center-gated 30wt% LCF/PP and 50wt% LCF/PA66 plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 10) Based on discussions with the University of Illinois and Autodesk, PNNL proposed a procedure to adjust fiber orientation data for Location A of the center-gated plaques so that the data can be expressed and interpreted in the flow/cross-flow direction coordinate system. 11) PNNL tested the new ASMI version received from Autodesk, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 12) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corp. (Magna) participated in discussions with team members on the go/no-go plan and the issues related to fiber length measurements. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

  6. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Second FY 2015 Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Fifield, Leonard S.; Kijewski, Seth A.; Sangid, Michael D.; Wang, Jin; Costa, Franco; Tucker, III, Charles L.; Mathur, Raj N.; Gandhi, Umesh N.; Mori, Steven

    2015-05-19

    During the second quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk reviewed 3D fiber orientation distribution (FOD) comparisons and provided support on improving accuracy. 2) Autodesk reviewed fiber length distribution (FLD) data comparisons and provided suggestions, assisted PNNL in FOD and FLD parameter settings optimization, and advised PNNL on appropriate through thickness thermal conductivity for improved frozen layer effect on FOD predictions. Autodesk also participated in project review meetings including preparations and discussions towards passing the go/no-go decision point. 3) Autodesk implemented an improved FOD inlet profile specification method through the part thickness for 3D meshes and provided an updated ASMI research version to PNNL. 4) The University of Illinois (Prof. C.L. Tucker) provided Autodesk with ideas to improve fiber orientation modeling 5) Purdue University re-measured fiber orientation for the fast-fill 50wt% LCF/PA66 edge-gated plaque, and delivered the fiber orientation data for this plaque at the selected locations (named A, B, and C, Figure 1) to PNNL. Purdue also re-measured fiber orientation for locations A on the fast-fill 30wt% LCF/PP and 50wt% LCF/PA66 center-gated plaques, which exhibited anomalous fiber orientation behavior. 6) Purdue University conducted fiber length measurements and delivered the length data to PNNL for the purge materials (slow-fill 30wt% LCF/PP and 30wt% LCF/PA66 purge materials) and PlastiComp plaques selected on the go/no-go list for fiber length model validation (i.e., slow-fill edge-gated 30wt% LCF/PP and 30wt% LCF/PA66 plaques, Locations A, B, and C). 7) PNNL developed a method to recover intact carbon fibers from LCF/PA66 materials. Isolated fibers were shipped to Purdue for length distribution analysis. 8) PNNL completed ASMI mid-plane analyses for all the PlastiComp plaques defined on the go/no-go list for fiber orientation (FO) model validation and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. The 15% accuracy criterion based on evaluation of tensile and bending stiffness was used to assess the accuracy in fiber orientation predictions. 9) PNNL completed ASMI mid-plane analyses for all the PlastiComp plaques defined on the go/no-go list for fiber length distribution (FLD) model validation and compared the predicted length distributions with the measured data provided by Purdue at Locations A, B, and C on these plaques. The 15% accuracy criterion based on evaluation of tensile and bending stiffness was used to assess the accuracy in fiber orientation predictions. 10) PNNL tested the new ASMI version received from Autodesk in March 2015, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 11) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corporation (Magna) participated in discussions with team members on the go/no-go plan. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

  7. Monitoring Results Natural Gas Wells Near Project Rulison Fourth...

    Office of Legacy Management (LM)

    Fourth Quarter 2015 February 2016 Doc. No. S13825 Page 1 of 6 Monitoring Results Natural Gas Wells Near Project Rulison Fourth Quarter 2015 U.S. Department of Energy Office of Legacy ...

  8. Predictive engineering tools for injection-molded long-carbon-fiber thermoplastic composites - FY 2015 third quarterly report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Fifield, Leonard S.; Mori, Steven; Gandhi, Umesh N.; Wang, Jin; Costa, Franco; Wollan, Eric J.; Tucker, III, Charles L.

    2015-07-01

    During the third quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Magna oversaw the tool build and prepared the molding plan for the complex part of Phase II. 2) PlastiComp hosted a visit by Magna and Toyota on April 23rd to finalize the molding scope and schedule. The plan for molding trials including selection of molding parameters for both LFT and D-LFT for the U-shape complex part was established. 3) Toyota shipped the U-shape complex part tool to Magna on May 28th, 2015. 4) Plasticomp provided 30wt% LCF/PP and 30wt% LCF/PA66 compounded pellets to Magna for molding the complex part. 5) Magna performed preliminary molding trials on June 2nd, 2015 to validate wall thickness, fill profile, tool temperature and shot size requirements for the complex part. 6) Magna performed the first complex part run on June 16th and 17th, 2015 at Magnas Composite Centre of Excellence in Concord, ON, Canada. Dale Roland of Plasticomp, and Umesh Gandhi of Toyota also attended the molding. 7) Magna discussed and finalized the plan with PNNL and the team for cutting samples from molded parts at selected locations for fiber orientation and length measurements. 8) Magna provided the computer-aided design (CAD) files of the complex parts with and without ribs to PNNL and Autodesk to build the corresponding ASMI models for injection molding simulations. Magna also provided the actual parameters used. 9) Plasticomps provided knowledge and experience of molding LCF materials essential to the successful molding of the parts including optimization of fill speed, tool temperatures, and plasticizing conditions for the 30wt% LCF/PP and 30wt% LCF/PA66 materials in both rib and non-rib versions. 10) Magna molded additional parts for evaluation of mechanical property testing including torsional stiffness on June 29th and 30th, 2015 at Magnas Composite Center of Excellence. 11) Toyota began preparation for the torsion test of the specimens. Preparation of a computer-aided engineering (CAE) model to predict the performance is in progress. 12) Autodesk fixed an error in the implementation of the proper orthogonal decomposition (POD) calculation of fiber length that had caused the ASMI solution to crash and provided an updated build of ASMI containing the fix. 13)Autodesk reviewed and provided feedback for the complex part molding and measurement locations. 14) Autodesk provided support to set up the workflow for ASMI-ABAQUS analysis, and provided a fix and workaround for a bug in the ASMI-ABAQUS output command. 15) Autodesk helped build ASMI analysis models for the complex parts with and without ribs. 16) Autodesk worked on improving the orientation prediction accuracy in the shearing layer for 3D meshes based on comparison to measured data of the plaque moldings. 17) PNNL installed a new ASMI version received from Autodesk and performed comparative analyses to assess mid-plane versus 3D fiber length predictions using the full fiber length model and the reduced-order model (ROM) using POD. 18) PNNL presented the project scope, accomplishments, significant results and future plans to DOE and the USCAR Materials Tech Team on June 3rd, 2015. 19) PNNL discussed the cutting of samples from molded parts and finalized a plan with Magna and the team suggesting the sample size, locations and number of samples per location. 20) PNNL and Autodesk built ASMI models for the complex parts with and without ribs, and preliminary analyses of the part with ribs were conducted using the actual molding parameters received from Magna. 21) PNNL worked on a procedure to extract fiber orientation and length results from a 3D ASMI analysis to a 3D ABAQUS model. This procedure is essential to import ASMI fiber orientation and length to a 3D ABAQUS model of the part allowing future part structural analysis for weight reduction study.

  9. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Third Quarterly Report

    SciTech Connect (OSTI)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-08-06

    This quarterly report summarizes the status for the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The CRADA documents have been processed by PNNL Legal Services that is also coordinating the revision effort with the industrial parties to address DOEs comments.

  10. ARM Climate Research Facility Quarterly Value-Added Product Report...

    Office of Scientific and Technical Information (OSTI)

    Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 1-September 30, 2012 Citation Details In-Document Search Title: ARM Climate Research Facility ...

  11. FY 2008 Overall Contract and Project Management Improvement Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Metrics and Targets | Department of Energy 8 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2008 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2008 4th Quarter Metrics Final -- Overall Contract and Project Management Performance Metrics and Targets. PDF icon FY 2008 4th Quarter Metrics Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications FY

  12. Short-term energy outlook. Quarterly projections, second quarter 1996

    SciTech Connect (OSTI)

    1996-04-01

    The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

  13. Natural Gas Imports and Exports Third Quarter Report 2015 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Quarter Report 2015 Natural Gas Imports and Exports Third Quarter Report 2015 PDF icon 3Q2015.pdf More Documents & Publications Natural Gas Imports and Exports Fourth Quarter ...

  14. Microchannel Receiver Development- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this Oregon State University project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  15. Ormat Technologies Inc. Ormat Technologies Reports 2012 Fourth...

    Open Energy Info (EERE)

    Internet. updated 2013;cited 2013. Available from: http:www.ormat.comnewslatest-itemsormat-technologies-reports-2012-fourth-quarter-and-year-end-results Retrieved from...

  16. FY 2013 SECOND QUARTER REVIEW

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    debt. 3 Adjusted Net Revenues is calculated by adding Power Services and Transmission Services Net Revenues. 4 Financial reserves equal total cash plus deferred borrowing and...

  17. Post waterflood CO{sub 2} miscible flood in light oil fluvial - dominated deltaic reservoirs. Fourth quarterly progress report, July 1, 1995--September 30, 1995

    SciTech Connect (OSTI)

    1995-11-10

    Production from the Marg Area 1 at Port Neches is averaging 222 BOPD for this quarter. The production drop is due in part to mechanical problems and to poor sweep efficiency caused by water blockage that prevented the CO{sub 2} from contacting new residual oil deeper in the reservoir. Alternating water and gas injection assisted to some extent in maintaining oil production and improved the reservoir yield by reducing the gas production. A workover was performed on well Kuhn No. 38 to correct failed gravel pack setting. Production from the well was restored to 60 BOPD. Plugging of the injection wells continue to be a problem, reducing the injection rate in critical areas of the reservoir, near well Kuhn No. 15R. Texaco drilled the well Polk B No. 39 to The Marg Area 3 reservoir to gain structural position based on the 3D seismic, and found the sand present as anticipated. However, the sand did not have any hydrocarbon accumulation. For this reason, Texaco will abandon testing the idea of utilizing CO{sub 2} to accelerate the primary production rate and reduce water production and primary production cycle time, in the reservoir.

  18. Northeast Waste Management Alliance (NEWMA). Annual report FY 1993

    SciTech Connect (OSTI)

    Goland, A.N.; Kaplan, E.

    1993-11-01

    Funding was provided to Brookhaven National Laboratory in the fourth quarter of FY93 to establish a regional alliance as defined by Dr. Clyde Frank during his visit to BNL on March 7, 1993. In collaboration with the Long Island Research Institute (LIRI), BNL developed a business plan for the Northeast Waste Management Alliance (NEWMA). Concurrently, informal discussions were initiated with representatives of the waste management industry, and meetings were held with local and state regulatory and governmental personnel to obtain their enthusiasm and involvement. A subcontract to LIRI was written to enable it to formalize interactions with companies offering new waste management technologies selected for their dual value to the DOE and local governments in the Northeast. LIRI was founded to develop and coordinate economic growth via introduction of new technologies. As a not-for-profit institution it is in an ideal position to manage the development of NEWMA through ready access to venture capital and strong interactions with the business community, universities, and BNL. Another subcontract was written with a professor at SUNY/Stony Brook to perform an evaluation of new pyrolitic processes, some of which may be appropriate for development by NEWMA. Independent endorsement of the business plan recently by another organization, GETF, with broad knowledge of DOE/EM-50 objectives, provides a further incentive for moving rapidly to implement the NEWMA strategy. This report describes progress made during the last quarter of FY93.

  19. Natural Gas Imports and Exports Third Quarter Report 2013 | Department of

    Energy Savers [EERE]

    Energy Third Quarter Report 2013 Natural Gas Imports and Exports Third Quarter Report 2013 Natural Gas Imports and Exports Third Quarter Report 2013 PDF icon Natural Gas Imports and Exports Third Quarter Report 2013 More Documents & Publications Natural Gas Imports and Exports - Third Quarter Report 2014 Natural Gas Imports and Exports - Second Quarter Report 2013 Natural Gas Imports and Exports Fourth

  20. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    SciTech Connect (OSTI)

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  1. Annual Performance Report FY 2012, Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14 ...

  2. Scattering Solar Thermal Concentrators- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this Penn State project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  3. CSP Tower Air Brayton Combustor- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this SWRI project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  4. Next Generation Solar Collectors for CSP- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this 3M project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  5. Supercritical Carbon Dioxide Turbo-Expander- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this SWRI project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  6. Advanced Manufacture of Reflectors- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this University of Arizona project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  7. ARM Operations Quarterly Report July 1 - September 30 2013 (Program...

    Office of Scientific and Technical Information (OSTI)

    Title: ARM Operations Quarterly Report July 1 - September 30 2013 This reports on the fourth quarter facility statistics. Authors: Voyles, Jimmy W Publication Date: 2013-10-14 OSTI ...

  8. Short-term energy outlook. Quarterly projections, Third quarter 1995

    SciTech Connect (OSTI)

    1995-08-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

  9. HSEP Committee FY 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2016 Work Plan Updated 12/10/2015 during the committee meeting Beryllium program update  Placeholder Annual Employee Concerns Program  Placeholder  Hear from new program director at WRPS  Quarter 1 (Oct-Dec) Quarter 2 (Jan-Mar) Quarter 3 (Apr-Jun) Quarter 4 (July-Sept) Holding Bin Transportation Effects on Worker Safety - draft advice  Review of draft advice Safety culture improvement efforts (joint with TWC)  Discuss Sounding Board for upcoming Board meeting o Review

  10. First Quarter 2013 Letter from the Wind Program Director | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regards, Jose Zayas Addthis Related Articles Letter from the Wind Program Director: Fourth Quarter 2013 Wind and Water Power Program Realignment DOE Announces New Wind Vision ...

  11. Contract/Project Management

    Energy Savers [EERE]

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY ...

  12. Natural Gas Imports and Exports - Third Quarter Report 2011 | Department of

    Energy Savers [EERE]

    Energy 1 Natural Gas Imports and Exports - Third Quarter Report 2011 Natural Gas Imports and Exports - Third Quarter Report 2011 PDF icon Natural Gas Imports and Exports - Third Quarter Report 2011 More Documents & Publications Natural Gas Imports and Exports - Third Quarter Report 2012 Natural Gas Imports and Exports - Second Quarter Report 2011 Natural Gas Imports and Exports - Fourth

  13. 2007-2009 Power Rates Quarterly Updates (pbl/rates)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (PFR) Firstgov FY 2007 2009 Power Rates Quarterly Updates In BPAs 2007-2009 Wholesale Power Rate Case (WP-07), BPA agreed that it would post reports about BPAs power...

  14. Background Information for Independent Review Team. Lifecycle Plan and FY14

    Office of Scientific and Technical Information (OSTI)

    Quarterly Reports (Technical Report) | SciTech Connect Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly Reports Citation Details In-Document Search Title: Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly Reports Abstract not provided. Authors: Lordi, V. [1] + Show Author Affiliations Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States) Publication Date: 2014-10-24 OSTI Identifier: 1178415 Report

  15. FY 2014 Q3 RCA CAP Performance Metrics Report 2014-09-05.xlsx

    Energy Savers [EERE]

    Third Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics No. Contract/Project Management Performance Metrics FY 2014 Target FY 2014 Pre- & Post- CAP* Projected Comment 1 Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 67% Pre-CAP 75% Post-CAP Based on 3-year rolling period (FY12 to FY14). TPC is Total Project Cost. No. FY 2014 Target FY 2014 3rd Qtr Actual 2 95% 92% 3 95% 90% 4

  16. Quarterly coal report, January--March 1998

    SciTech Connect (OSTI)

    Young, P.

    1998-08-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for January through March 1998 and aggregated quarterly historical data for 1992 through the fourth quarter of 1997. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the United States, historical information has been integrated in this report. 58 tabs.

  17. FY 2012 FOIA Requests

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2013 FOIA Requests FY 2012 FOIA Requests FY 2011 FOIA Requests FY 2010 FOIA Requests Model Requests for Access or Correction Privacy Act Systems of Records Request Form Investor...

  18. Baseload CSP Generation Integrated with Sulfur-Based Thermochemical Heat Storage- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this General Atomics project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  19. High-Efficiency Receivers for Supercritical Carbon Dioxide Cycles- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this Brayton Energy project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  20. Self-Cleaning CSP Optics with EDS- FY12 Q4

    Broader source: Energy.gov [DOE]

    This document summarizes the progress of this Boston University project, funded by SunShot, for the fourth quarter of fiscal year 2012.

  1. Fourth Fridays Downtown

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays Downtown Fourth Fridays Downtown WHEN: Sep 25, 2015 10:00 AM - 6:00 PM WHERE: Bradbury Science Museum 1350 Central Avenue, Los Alamos, New Mexico 87544, USA CONTACT: Jessica Privette 505 667-0375 CATEGORY: Bradbury INTERNAL: Calendar Login Fourth Fridays in Downtown Los Alamos Event Description The museum will be open late until 6pm every Fourth Friday offering extended access to exhibits, special programming, and activities. The Los Alamos Creative District is introducing Fourth

  2. Quarterly Update January through March - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quarterly Coal Distribution Report Release Date: March 9, 2016 | Next Release Date: May 2016 | full report The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of transportation, and consuming sector. Quarterly data for all years are preliminary and will be superseded by the release of the corresponding "Annual Coal Distribution Report." Highlights for the fourth quarter 2014: Total

  3. Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 | Department of Energy 2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14 More Documents & Publications Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2011 Annual

  4. Stationary Fuel Cell System Composite Data Products: Data through Quarter 4 of 2013

    SciTech Connect (OSTI)

    Saur, G.; Kurtz, J.; Ainscough, C.; Peters, M.

    2014-05-01

    This report includes 25 composite data products (CDPs) produced for stationary fuel cell systems, with data through the fourth quarter of 2013.

  5. FY 2006 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Discretionary Summary By Appropriation Energy And Water Development Appropriation Summary: Energy Programs Energy supply Operation and maintenance................................................. 787,941 909,903 862,499 -47,404 -5.2% Construction......................................................................... 6,956

  6. Idaho National Laboratory Quarterly Occurrence Analysis

    SciTech Connect (OSTI)

    Mitchell, Lisbeth Ann

    2015-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 85 reportable events (18 from the 4th Qtr FY-15 and 67 from the prior three reporting quarters), as well as 25 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (8 from this quarter and 17 from the prior three quarters).

  7. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    27, 2011 and contains BPA-Approved Agency Financial Information Transmission Capital Strategic Drivers Key drivers for developing expansion strategies Meet all regulatory...

  8. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    requirements. Empowers customers to choose to control their energy usage - Smart meters - Homebuildingindustrial energy managementcontrol systems - User information interfaces...

  9. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    systems are vitally important to BPA operations as they are used to collect real-time reservoir operations and water release data, provide operational tools for management of...

  10. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is based on actual cost estimates with efficiencies built in. The majority of Supply Chain costs come from personnel, then costs to operate the equipment and fleet and special...

  11. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by BPA on October 30, 2009 and contains BPA-approved Agency Financial Information. Agenda November 2, 2009 1:00-4:00 pm Time Min Agenda Topic Slide Presenter 1:00 10...

  12. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    available by BPA on April 30, 2010 and contains BPA-Approved Agency Financial Information Agenda Time Min Agenda Topic Slide Presenter 1:00 10 Introduction and Background, Follow...

  13. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring of property loss against the thresholds will allow BPA to assess the effectiveness of property management system and provide a trigger mechanism for...

  14. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    prices impacting power revenues, specifically net secondary revenues? * In general, lower electricity prices will mean that we have to sell our power for less, which will...

  15. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - MarketingSales ReservationsE-Tag Automation 28-34 Sue Holden Baker 2:25 15 Fish & Wildlife - Research, Monitoring & Evaluation 35-41 Bill Maslen, Jamae Hilliard Creecy...

  16. Quarterly Business Review FY 2009 3rd Quarter Financial Results...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    over prior processes, however, there is still room for improvement. A lessons learned meeting with BPA staff would be helpful. * Process Improvement - Surveys? Online...

  17. NEPA Lessons Learned Third Quarter FY 2006

    Office of Environmental Management (EM)

    2, 20 13 Dr. Charles F. McMillan Laboratory Director Los Alamos National Security, LLC Mail Stop A-1 00, Drop Point 03 14007 1 S Bikini Atoll Road, T A-3 Los Alamos, New Mexico 87545-1 663 NEL-2013 -02 Dear Dr. McMillan: The Office ofHealth, Safety and Security' s Office of Enforcement and Oversight conducted an evaluation of the deficiencies at the Los Alamos Neutron Science Center (LANSCE) described in the Los A lamos National Security, LLC (LANS) Noncomplia nce Tracking System (NTS) report

  18. Quarterly Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    available by BPA on 10-28-2010 1 Report ID: 0070FY10 Federal Columbia River Power System Statement of Revenues and Expenses Data Source: EPM Data Warehouse Requesting BL:...

  19. Quarterly coal report, January--March 1997

    SciTech Connect (OSTI)

    1997-08-01

    This Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience,including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1997 and aggregated quarterly historical data for 1991 through the fourth quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  20. Quarterly coal report, January--March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-24

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1994 and aggregated quarterly historical data for 1986 through the fourth quarter of 1993. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  1. Quarterly coal report, January--March 1995

    SciTech Connect (OSTI)

    1995-08-24

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1995 and aggregated quarterly historical data for 1987 through the fourth quarter of 1994. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  2. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 – September 30, 2008

    SciTech Connect (OSTI)

    Sisterson, DL

    2008-09-30

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2008 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter.

  3. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  4. FY14

    National Nuclear Security Administration (NNSA)

    Document1 1 Summary of Experiments Conducted in Support of Stockpile Stewardship FY14 The U.S. Stockpile Stewardship Program is a robust program of scientific inquiry used to sustain and assess the nuclear weapons stockpile without the use of underground nuclear tests. The experiments carried out within the program are used in combination with Advanced Simulation and Computing (ASC) to continually assess the stockpile to ensure it is safe, secure, and effective. (For links to the ASC program,

  5. Short-term energy outlook. Quarterly projections, third quarter 1996

    SciTech Connect (OSTI)

    1996-07-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  6. Short-term energy outlook: Quarterly projections. Second quarter 1995

    SciTech Connect (OSTI)

    1995-05-02

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  7. Stationary Fuel Cell System Composite Data Products: Data through Quarter 4 of 2014; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Saur, G.; Kurtz, J.; Ainscough, C.; Sprik, S.; Post, M.

    2015-04-01

    This publication includes 33 composite data products (CDPs) produced for stationary fuel cell systems, with data through the fourth quarter of 2014.

  8. Next Generation Hydrogen Station Composite Data Products: Data through Quarter 4 of 2014; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Sprik, S.; Kurtz, J.; Ainscough, C.; Peters, M.

    2015-05-14

    This publication includes 43 composite data products (CDPs) produced for next generation hydrogen stations, with data through the fourth quarter of 2014.

  9. RESEARCH QUARTERLY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RESEARCH QUARTERLY First Quarter 2015 Th 90 Ac 89 Pa 91 U 92 Np 93 Pu 94 Am 95 Cm 96 Bk 97 Cf 98 Es 99 Fm 100 Md 101 No 102 Lr 103 Glenn T. Seaborg Institute for Transactinium Science/Los Alamos National Laboratory Actinide Research Quarterly About the cover The crystalline structure of plutonium in its elemental form, and in molecules and compounds with other elements, is the basis for understanding the intriguing chemistry, physics, and engineering of plutonium molecules and compounds. Colored

  10. Short-term energy outlook, quarterly projections, first quarter 1998

    SciTech Connect (OSTI)

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  11. Short-term energy outlook. Quarterly projections, first quarter 1996

    SciTech Connect (OSTI)

    1996-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

  12. Annual Performance Report FY 2005 Annual Performance Plan FY 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 PDF icon Annual Performance Report FY 2005 Annual Performance Plan FY 2006 More Documents & Publications U.S. Department of Energy 2006 Annual Report FTCP Annual Plan - Fiscal Year 2005 FY 2008 E-Government Act Report

  13. Strategic Petroleum Reserve: Annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1994-02-16

    Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

  14. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2009-10-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2009, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The fourth quarter comprises a total of 2,208 hours for the fixed and mobile sites. The average of the fixed sites well exceeded our goal this quarter. The AMF data statistic requires explanation. Since the AMF radar data ingest software is being modified, the data are being stored in the DMF for data processing. Hence, the data are not at the Archive; they are anticipated to become available by the next report.

  15. FY 2015 Summary Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Summary Control Table by Organization (dollars in thousands - OMB Scoring) Summary Control by Organization Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY ...

  16. FY 2007 Congressional Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request FY 2007 Congressional Request FY 2007 Laboratory Tables PDF icon FY 2007 Congressional Request More Documents & Publications FY 2007 Congressional Budget

  17. Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2010-10-26

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

  18. FY 2008 Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Performance Reports » FY 2008 Annual Performance Report FY 2008 Annual Performance Report Outlines the Department's performance in fiscal year 2008 against the goals set out in the President's proposed fiscal year 2008 budget. The metrics discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. PDF icon FY 2008 Annual Performance Report More Documents & Publications FY

  19. FY 2007 Secretary Rollout

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget DOE: Energy, Science, and Security February 6, 2006 1 Guiding Principles * Advancing our National Security * Reducing Dependence on Foreign Oil * Increasing Economic Competitiveness through Scientific Discovery * Honoring our Commitments * Managing for Excellence Supporting our Nation's Highest Priorities 2 DOE Budget : FY 2006 and FY 2007 ($ in Billions) National Security $9.1 Energy and Environm ent $9.9 Science $3.6 Corporate M anagem ent $1.0 FY 2006 Appropriation $23.6 Billion FY

  20. FY 2010 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2008 FY 2009 FY 2009 FY 2010 Current Current Current Congressional Approp. Approp. Recovery Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy....................................... 1,704,112 2,178,540 16,800,000 2,318,602 +140,062 +6.4% Electricity delivery and energy

  1. FY 2012 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2010 FY 2011 FY 2011 FY 2012 Current Congressional Annualized Congressional Approp. Request CR Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy....................................... 2,216,392 2,355,473 2,242,500 3,200,053 +983,661 +44.4% Electricity delivery and energy

  2. Domestic Uranium Production Report - Quarterly

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    1. Total production of uranium concentrate in the United States, 1996 - 3rd quarter 2015 pounds U3O8 Calendar-year quarter 1st quarter 2nd quarter 3rd quarter 4th quarter...

  3. FY2012UBR.pdf

    Energy Savers [EERE]

    6 NE Budget Request Presentation FY16 NE Budget Request Presentation PDF icon Office of Nuclear Energy FY16 Budget Request Presentation More Documents & Publications FY17 NE Budget Request Presentation Office of Nuclear Energy Fiscal Year 2014 Budget Request FY 2016 Budget Justification

    7 NE Budget Request Presentation FY17 NE Budget Request Presentation PDF icon FY17 NE Budget Request Presentation More Documents & Publications FY16 NE Budget Request Presentation Office of Nuclear

  4. FY 2007 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2005 FY 2006 FY 2007 Current Current Congressional Approp. Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and conservation Operation and maintenance............................................ 1,779,399 1,791,372 1,917,331 +125,959 +7.0%

  5. FY 2008 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2006 FY 2007 FY 2008 Current Congressional Congressional Approp. Request Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and conservation Operation and maintenance........................................... 1,781,242 1,917,331 2,187,943 +270,612 +14.1%

  6. FY 2013 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2011 FY 2012 FY 2013 Current Enacted Congressional Approp. Approp. * Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy........................................ 1,771,721 1,809,638 2,337,000 +527,362 +29.1% Electricity delivery and energy reliability.........................................

  7. Idaho National Laboratory Quarterly Performance Analysis

    SciTech Connect (OSTI)

    Lisbeth Mitchell

    2014-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INL from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.

  8. FY 2008 Secretary Rollout

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget Investing in Science and Energy Security February 5, 2007 1 The Focus * Investing in World-Class Science * Advancing Energy Security * Reducing Dependence on Foreign Sources of Energy * Promoting the Use of Clean Energy * Honoring our Commitments Supporting our Nation's Highest Priorities 2 DOE Budget : FY 2007 and FY 2008 ($ in Billions) National Security $9.3 Corporate Management $1.0 Science $4.1 Energy and Environment $9.2 FY 2007 Request $23.6 Billion FY 2008 Request $24.3 Billion FY

  9. Short-term energy outlook: Quarterly projections, second quarter 1997

    SciTech Connect (OSTI)

    1997-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

  10. Advanced research and technology development fossil energy materials program. Quarterly progress report for the period ending September 30, 1981

    SciTech Connect (OSTI)

    Bradley, R.A.

    1981-12-01

    This is the fourth combined quarterly progress report for those projects that are part of the Advanced Research and Technology Development Fossil Energy Materials Program. The objective is to conduct a program of research and development on materials for fossil energy applications with a focus on the longer-term and generic needs of the various fossil fuel technologies. The program includes research aimed toward a better understanding of materials behavior in fossil energy environments and the development of new materials capable of substantial enhancement of plant operations and reliability. Work performed on the program generally falls into the Applied Research and Exploratory Development categories as defined in the DOE Technology Base Review, although basic research and engineering development are also conducted. A substantial portion of the work on the AR and TD Fossil Energy Materials Program is performed by participating cntractor organizations. All subcontractor work is monitored by Program staff members at ORNL and Argonne National Laboratory. This report is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1981 in which projects are organized according to fossil energy technologies. We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program.

  11. FY 2013 Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Summary Control Table by Organization (dollars in thousands - OMB Scoring) FY 2011 FY ... FY 2013 vs. FY 2012 Control table by Organization Page 1 FY 2013 Congressional Budget ...

  12. FY 2010 Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Control Table by Organization (dollars in thousands - OMB Scoring) FY 2008 FY 2009 FY ... FY 2010 vs. FY 2009 Control table by organization 1 562009 9:54 AM Department of Energy ...

  13. FY 2007 Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Table by Organization (dollars in thousands - OMB Scoring) FY 2005 FY 2006 FY 2007 ... FY 2006 Page 1 Department of Energy FY 2007 Control Table by Organization (dollars in ...

  14. Annual Performance Report FY 2010 Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Performance Plan FY 2011 Annual Performance Report FY 2010 Annual Performance Plan FY 2011 I am pleased to submit the Office of Inspector General's combined Fiscal Year ...

  15. FY 2011 Report on Unobligated Balances

    Energy Savers [EERE]

    FY 2007 Budget Highlights PDF icon FY 2007 Congressional Budget Request More Documents & Publications FY 2007 Budget Justification FY 2007 Congressional Budget Request FY 2006 Budget Justification

    Budget Request FY 2007 Congressional Budget Request Laboratory Tables for the Department of Energy's 2007 Congressional budget. PDF icon FY 2007 Congressional Budget Request More Documents & Publications FY 2007 Congressional

    Request FY 2007 Congressional Request FY 2007 Laboratory

  16. Letter from the Wind Program Director: Fourth Quarter 2012 |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Together, we can learn from the experiences of the past and work towards confronting the challenges of the future. Thank you for your continued support. Jose Zayas Addthis Related ...

  17. ARM Climate Research Facility Quarterly Instrument Report Fourth...

    Office of Scientific and Technical Information (OSTI)

    future instrumentation, and (4) Small Business Innovation Research instrument development. ... Language: English Subject: 54 ENVIRONMENTAL SCIENCES; BUSINESS; CLIMATES; RADIATIONS; ...

  18. Financial News for Major Energy Companies, Fourth Quarter 2006

    Gasoline and Diesel Fuel Update (EIA)

    to Q405 with the exception of worldwide chemical operations. (Note: corporate net income ... Worldwide Chemical Operations Higher margins fuel a 35-percent increase in earnings from ...

  19. EIA directory of electronic products. Fourth quarter 1995

    SciTech Connect (OSTI)

    1996-08-01

    The Energy Information Administration (EIA) makes available for public use a series of machine-readable data files and computer models. The data files and models are made available to the public on magnetic tapes. In addition, selected data files/models are available on diskette for IBM-compatible personal computers.

  20. EIA directory of electronic products fourth quarter 1993

    SciTech Connect (OSTI)

    Not Available

    1994-02-23

    The Energy Information Administration (EIA) makes available for public use a series of machine-readable data files and computer models. The data files and models are made available to the public on magnetic tapes. In addition, selected data files/models are available on diskette for IBM-compatible personal computers. For each product listed in this directory, a detailed abstract is provided which describes the data published.

  1. Natural gas imports and exports. Fourth quarter report

    SciTech Connect (OSTI)

    1995-12-31

    This report summarizes the data provided by companies authorized to import or export natural gas. Data includes volume and price for long term and short term, and gas exported to Canada and Mexico on a short term or spot market basis.

  2. FY 2008 & FY 2009 Annual Uncosted Balances Report

    Broader source: Energy.gov [DOE]

    This report presents a combined presentation and analysis of the Department’s uncosted balances for FY 2008 and FY 2009.

  3. Quarterly Progress Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quarterly Progress Reports Quarterly Progress Reports Investigating the field of high energy physics through experiments that strengthen our fundamental understanding of matter,...

  4. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th...

  5. Fuel Cell Technologies Office Funding by State: FY 2013, FY 2014, and FY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy Funding by State: FY 2013, FY 2014, and FY 2015 Fuel Cell Technologies Office Funding by State: FY 2013, FY 2014, and FY 2015 Competitively Selected Projects and National Lab Core Capabilities - Prime Recipients Only Competitively Selected Projects and National Lab Core Capabilities - Prime Recipients Only View a list of projects, organized by state, funded by the Fuel Cell Technologies Office for fiscal years 2013, 2014, and 2015. PDF icon Fuel Cell Technologies

  6. FY15 Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events, Deadlines FY15 Events High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contacts Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia Sanchez 665-0855 Email Events and deadlines DATE EVENT/DEADLINE DETAILS January 30 Call for FY 2016 Proposals Issued See call for proposal information for further details. April 30 FY 2016 Proposals Due Submit proposals by a Los Alamos PI no later

  7. FY 2009 Statistical Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy.......................... -- 1,722,407 1,255,393 -467,014 -27.1% Electricity delivery and energy reliability........................... -- 138,556 134,000 -4,556 -3.3% Nuclear

  8. FY 2005 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congressional Budget Request Laboratory Tables Preliminary Department of Energy FY 2005 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2004 Laboratory Tables Preliminary Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Office of Management, Budget and Evaluation/CFO February 2004 Laboratory Tables Laboratory Tables Printed with soy ink on recycled paper Preliminary Preliminary The numbers

  9. FY 2013 Volume 5

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 DOE/CF-0075 Volume 5 Environmental Management Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 5 DOE/CF-0075 Volume 5 Environmental Management Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Environmental Management Page 1 FY 2013 Congressional Budget Volume 5 Table of Contents Page Appropriation Account Summary

  10. FY 2012 Volume 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... FY 2012 Congressional Budget rapidly changing priorities. ... nuclear devices has systematic gaps that are being ... and accreditation, and education and training initiatives, ...

  11. FY 2006 Volume 7

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... technology validation, technology transfer, and education. ... because of the continually changing price of gasoline. ... FY 2005 (000) Federal Fleets Make systematic ...

  12. FY 2011 LDRD Report

    Broader source: Energy.gov [DOE]

    The total FY 2011 LDRD Program cost at the national laboratories was $581 million, which represents approximately 4.7 percent of total cost base at these laboratories.

  13. FY 2010 LDRD Report

    Broader source: Energy.gov [DOE]

    The total FY 2010 LDRD program cost at the national laboratories was $541 million, which represents approximately 4.6 percent of total cost base at these laboratories.

  14. Fourth Fridays - Museum Open Late

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays - Museum Open Late Fourth Fridays - Museum Open Late WHEN: Oct 23, 2015 10:00 AM - 6:00 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, NM 87544 USA CONTACT: Jessica Privette 505 667-0375 CATEGORY: Bradbury INTERNAL: Calendar Login Fourth Fridays in Downtown Los Alamos Event Description The museum will be open late until 6 p.m. every Fourth Friday offering extended access to exhibits, special programming, and activities. The Los Alamos Creative District is

  15. Fourth Fridays - Museum Open Late

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays - Museum Open Late Fourth Fridays - Museum Open Late WHEN: Jan 22, 2016 10:00 AM - 6:00 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, NM 87544 USA CONTACT: Linda Anderman (505) 665-9196 CATEGORY: Bradbury INTERNAL: Calendar Login Fourth Fridays in Downtown Los Alamos Event Description The museum will be open late until 6 p.m. every Fourth Friday offering extended access to exhibits, special programming, and activities. The Los Alamos Creative District is

  16. FY 2012 LDRD Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 LDRD Report FY 2012 LDRD Report The total FY 2012 LDRD Program cost at the national laboratories was $578.9 million in 1,738 projects. PDF icon FY 2012 LDRD Report to Congress PDF icon FY 2012 Project List More Documents & Publications FY 2013 LDRD Report FY 2011 LDRD Report FY 2014 LDRD Report

  17. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2013

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Peters, M.

    2014-06-01

    This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the fourth quarter of 2013.

  18. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2012

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.; Ramsden, T.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the fourth quarter of 2012.

  19. Stationary Fuel Cell System Composite Data Products: Data Through Quarter 4 of 2012

    SciTech Connect (OSTI)

    Ainscough, C.; Kurtz, J.; Saur, G.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes stationary fuel cell system composite data products for data through the fourth quarter of 2012.

  20. FY 2005 Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 13 Department of Energy FY 2005 Control Table by Appropriation (dollars in ... FY 2004 Page 1 Department of Energy FY 2005 Control Table by Appropriation (dollars in ...

  1. Quarterly Progress Report

    Broader source: Energy.gov [DOE]

    Quarterly Progress Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  2. Fossil Energy FY 2009 Budget

    Broader source: Energy.gov [DOE]

    Fossil Energy's FY 2009 budget, including request, House and Senate marks, and Omnibus appropriation.

  3. FY 2005 Budget Highlights

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Office of Management, Budget and Evaluation/CFO February 2004 Budget Highlights Budget Highlights Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0039 Office of Management, Budget and Evaluation/CFO February 2004 Budget Highlights Budget Highlights Printed with soy ink on recycled paper Table of Contents INTRODUCTION

  4. FY 2005 Volume 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Volume 6 Power Marketing Administrations Power Marketing Administrations Southeastern Power Administration Southeastern Power Administration Southwestern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration Bonneville Power Administration February 2004 Volume 6 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005

  5. FY 2013 Budget Highlights

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Department of Energy FY 2013 Congressional Budget Request Budget Highlights g g g February 2012 Office of Chief Financial Officer DOE/CF-0077 Department of Energy FY 2013 Congressional Budget Request Budget Highlights g g g February 2012 Office of Chief Financial Officer Printed with soy ink on recycled paper Table of Contents LETTER FROM THE SECRETARY

  6. FY 2013 Volume 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Volume 6 Department of Energy FY 2013 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Western Area Power Administration Bonneville Power Administration February 2012 Office of Chief Financial Officer Volume 6 DOE/CF-0076 Volume 6 Department of Energy FY 2013 Congressional Budget Request Power Marketing Administrations Southeastern Power Administration Southwestern Power

  7. DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 PDF icon DOE/IG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 More Documents & Publications Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Office Inspector General DOE Annual

  8. FY 2011 Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Summary Control Table by Organization (dollars in thousands - OMB Scoring) FY 2009 FY ... FY 2011 vs. FY 2010 Control table by Organization Page 1 of 10 312010 8:16 AM Department ...

  9. LFCM vitrification technology. Quarterly progress report, January-March 1986

    SciTech Connect (OSTI)

    Burkholder, H.C.; Minor, J.E.

    1986-09-01

    This report is compiled by the Nuclear Waste Treatment Progrqam and the Hanford Waste Vitrification Program at Pacific Northwest Laboratory to document progress on liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the second quarter of FY 1986 is discussed: melting process chemistry and glass development, feed preparation and transfer systems, melter systems, canister filling and handling systems, off-gas systems, and process/product modeling and control.

  10. Program Update: 1st Quarter 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Program Update: 1st Quarter 2014 Inside this Update: DOE Celebrates 20-Year Anniversary of Executive Order 12898; LM Updates the Public on Defense-Related Uranium Mines Report to Congress; LM Issues ULP PEIS; Tracking Uranium Atoms; LM and MSEM Provide Public Education; Bobcats at the Fernald Preserve; LM Meets with Native Village of Point Hope, Alaska; 2014 Waste Management Conference; FY 2015 Budget Request; Mound Workshop Save the Date; Records/IT Disaster Exercise; 2014 National

  11. Program Update: 1st Quarter 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Program Update: 1st Quarter 2015 Inside this update: Successful Transition from Mound Site to Mound Business Park Continues; Second Five-Year Plan to Address Uranium Contamination in the Navajo Nation; Nuclear Weapons Program Workers Honored; New Guidance Helps LM Manage Institutional Controls; Recent Eclipse Viewing Staged at the Fernald Preserve; UMTRCA Title II Audit; LMBC Records-Emergency Exercise; FY 2016 Budget Summary; GEMS Mapping and Specific Information; Environmental Justice

  12. Program Update: 4th Quarter 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Program Update: 4th Quarter 2014 Inside this Update: Enhanced Bioremediation-Pinellas County, Florida, Site; New Eligibility Guidelines Lead to Increase in LM's EEOICPA Requests for FY 2014; Thinking Outside the Box: Materials Reuse-Durango, Colorado, Site; Evolution of a Groundwater Treatment System-Rocky Flats, Colorado, Site; Applied Studies and Technology Stakeholder Outreach: Helping Native Students Heal the Land; Mound Science and Energy Museum Programs Cover a Wide Range of Topics;

  13. Program Update: 4th Quarter 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Program Update: 4th Quarter 2015 Inside this Update: Pinellas Site Uses Horizontal Wells for Enhanced Bioremediation; Fernald Preserve: A Learning Destination; Records Requests Continued to Increase in FY 2015; Luis Alvarez and the Manhattan Project; Annual Accountability Report in Review as LM Readies Its 2017-2021 HPO Proposal; LM Announces New Team Leaders; Environmental Justice Activities; Navarro Research and Engineering, Inc. - LM Support Services Contractor; Federal Agencies Collaborate

  14. FY 2013 LDRD Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LDRD Report FY 2013 LDRD Report The total FY 2013 LDRD Program cost at the national laboratories was $568.6 million in 1,742 projects. PDF icon 2013 LDRD Report December 2013.pdf PDF icon DOE LDRD Project List FY 2013.pdf More Documents & Publications FY 2012 LDRD Report FY 2011 LDRD Report FY 2010 LDRD Report

  15. FY 2014 LDRD Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 LDRD Report FY 2014 LDRD Report The total FY 2014 LDRD Program cost at the national laboratories was $527 million in 1,662 projects. PDF icon 2014 LDRD Report To Congress PDF icon DOE LDRD Project List FY2014 More Documents & Publications FY 2012 LDRD Report FY 2015 LDRD Report FY 2013

  16. FY 2015 LDRD Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 LDRD Report FY 2015 LDRD Report The total FY 2015 LDRD Program cost at the national laboratories was $542 million in 1,741 projects. PDF icon 2015 LDRD Report To Congress PDF icon DOE LDRD Project List FY2015 More Documents & Publications FY 2013 LDRD Report FY 2012 LDRD Report FY 2011

  17. FY 2015 Summary Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Summary Control Table by Organization (dollars in thousands - OMB Scoring) Summary Control by Organization Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY 2015 Current Enacted Adjustments Current Congressional Approp. Approp. Approp. Request Discretionary Summary By Organization Department Of Energy By Organization National Nuclear Security Administration Weapons Activities............................................................................. 6,966,855 7,781,000

  18. National Renewable Energy Laboratory 10 Year Site Plan FY 2007...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy...

  19. FY 2007 Congressional Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget Highlights PDF icon FY 2007 Congressional Budget Request More Documents & Publications FY 2007 Budget Justification FY 2007 Congressional Budget Request FY 2006 Budget Justification

  20. FY 2007 Congressional Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Table PDF icon FY 2007 Congressional Budget Request More Documents & Publications FY 2007 Congressional Budget Request FY 2007 Congressional Budget Request FY 2007 Congressional Request

  1. DOE/IG Annual Performance Report FY 2008, Annual Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report ...

  2. Fossil Energy FY 2012 Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Fossil Energy FY 2012 Budget More Documents & Publications FY 2014 Budget Request Statistical Table Fossil Energy FY 2013 Budget FY 2014 Department of Energy Budget ...

  3. ARM Climate Research Facility Quarterly Instrument Report Fourth Quarter: October 1–December 30, 2010

    SciTech Connect (OSTI)

    Voyles, JW

    2011-01-17

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  4. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Fourth Quarter 1983

    SciTech Connect (OSTI)

    1983-01-01

    At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small power production projects was 305, with a total estimated nominal capacity of 2,389 MW. Of these totals, 202 projects, capable of producing 566 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration, solid waste, or biomass projects had signed 101 contracts with a potential of 1,408 MW. In total, 106 contracts and letter agreements had been signed with projects capable of producing 1,479 MW. PG and E also had under active discussion 29 cogeneration projects that could generate a total of 402 MW to 444 MW, and 13 solid waste or biomass projects with a potential of 84 MW to 89 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 28, with a generating capability of 618 MW. Also, discussions were being conducted with 14 wind farm projects, totaling 365 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 8 other small wind projects under active discussion. There were 59 hydroelectric projects with signed contracts and a potential of 146 MW, as well as 72 projects under active discussion for 169 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E was planning to construct. Table B displays the above information. In tabular form, in Appendix A, are status reports of the projects as of December 31, 1983.

  5. FY 2006 Volume 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... in FY 2006, BWXT Y-12 is changing its cost-estimating model ... framework for performing systematic, life-extension upgrades ... 274 personnel and a Design and Education Center. ...

  6. FY 2010 Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 2010 U.S. Department of Energy T he narrative below discusses FY 2010 results for the ... Modernizing the Electrical Grid. The nation's ability to meet the growing demand for ...

  7. FY 2009 Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Performance Reports » FY 2009 Annual Performance Report FY 2009 Annual Performance Report DOE's Annual Performance Report (APR) outlines the Department's performance in fiscal year 2009 against the goals that were set in the President's fiscal year 2009 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Because these measures were

  8. FY 2010 Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Performance Reports » FY 2010 Annual Performance Report FY 2010 Annual Performance Report Department of Energy's Annual Performance Report (APR) compares the Department's performance results for fiscal year 2010 with goals set in the President's fiscal year 2010 budget. The performance measures discussed in this report were outlined in the Department's congressional budget justifications and carried through the actual execution of the budget during the fiscal year. Performance

  9. FY 2012 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Department of Energy FY 2012 Congressional Budget Request State Tables P li i Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0066 Department of Energy FY 2012 Congressional Budget Request State Tables P li i Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They displayed. The figures include both the discretionary and

  10. FY 2005 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Management, Budget and Evaluation/CFO February 2004 State Tables State Tables Preliminary Preliminary Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Office of Management, Budget and Evaluation/CFO February 2004 State Tables State Tables Printed with soy ink on recycled paper Preliminary Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The

  11. FY 2005 Volume 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Volume 1 February 2004 Volume 1 National Nuclear Security Administration National Nuclear Security Administration Office of the Administrator Office of the Administrator Weapons Activities Weapons Activities Defense Nuclear Nonproliferation Defense Nuclear Nonproliferation Naval Reactors Naval Reactors Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0032 Volume 1 February

  12. FY 2005 Volume 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ME-0035 Volume 4 Science Science Nuclear Waste Disposal Nuclear Waste Disposal Defense Nuclear Waste Disposal Defense Nuclear Waste Disposal Departmental Administration Departmental Administration Inspector General Inspector General Working Capital Fund Working Capital Fund February 2004 Volume 4 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request DOE/ME-0035 Volume 4 Science Science

  13. FY 2013 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Department of Energy FY 2013 Congressional Budget Request State Tables P li i Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0079 Department of Energy FY 2013 Congressional Budget Request State Tables P li i Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They displayed. The figures include both the discretionary and

  14. FY 2013 Volume 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Volume 2 f Department of Energy FY 2013 Congressional B d R Budget Request Other Defense Activities Departmental Administration Inspector General Working Capital F nd Working Capital Fund Safeguards and Security Crosscut Pensions February 2012 Office of Chief Financial Officer Volume 2 DOE/CF-0072 Volume 2 f Department of Energy FY 2013 Congressional B d R Budget Request Other Defense Activities Departmental Administration Inspector General Working Capital F nd Working Capital Fund Safeguards

  15. FY 2013 Volume 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE/CF-0074 Volume 4 Science Advanced Research Projects Agency-Energy Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 4 DOE/CF-0074 Volume 4 Science Advanced Research Projects Agency-Energy Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Science Advanced Research Projects Agency- Energy Science Advanced Research Projects Agency- Energy Department of Energy/Science/ Advanced

  16. FY 2013 Volume I

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 DOE/CF-0071 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Department of Energy FY 2013 Congressional Budget Request February 2012 Office of Chief Financial Officer Volume 1 DOE/CF-0071 Volume 1 National Nuclear Security Administration Office of the Administrator Weapons Activities Defense Nuclear Nonproliferation Naval Reactors Printed with soy ink on recycled paper Department of Energy FY 2013

  17. LFCM (liquid-fed ceramic melter) vitrification technology: Quarterly progress report, October-December 1986

    SciTech Connect (OSTI)

    Brouns, R.A.; Allen, C.R.; Powell, J.A.

    1987-09-01

    This report describes the progress in developing, testing, applying, and documenting liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the first quarter of FY 1987 is discussed. Topics include melting process chemistry and glass development, feed preparation and transfer systems, melter systems, off-gas systems, canister filling and handling systems, and process/product modeling.

  18. Annual Performance Report FY 2011 Annual Performance Plan FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Inspector General Annual Performance Report FY 2011 Annual Performance Plan FY 2012 2 FY 2011 OIG Performance Results The OIG measures its performance against long-term and annual goals set forth in OIG planning documents. During this reporting period, the OIG successfully achieved its FY 2011 performance goals. The following are the specific results: Goal 1 Promote Presidential Reform Initiatives, Secretarial Mission Priorities, and Congress Objective 1: Conduct

  19. BTO FY16-FY18 National Laboratory Call & Merit Review

    Broader source: Energy.gov [DOE]

    CLOSED Letter of Intent Deadline: February 17, 2015 Full Application Submission Deadline: March 13, 2015 BTO is seeking 2 or 3 year project proposals from national laboratories for activities to incorporate into the FY 2016, FY 2017, and FY 2018 Annual Operating Plans.

  20. FY 2016 PMCDP Training Schedule

    Energy Savers [EERE]

    Last Update February 29, 2016 1 | P a g e FY 2016 PMCDP Training Schedule Q1 FY 2016: Course Title Length Planned Delivery Timeframe Location Platform Equivalent Training Planning ...

  1. FY 2007 Congressional Budget Request

    Energy Savers [EERE]

    4 LDRD Report FY 2004 LDRD Report The multi-program National Laboratories devoted approximately $365 million to LDRD for FY 2004. LDRD investments compared to the sources of laboratory funding indicates the LDRD benefits are commensurate with the funding received from defense, non-defense, and Department of Homeland Security (DHS) sources. PDF icon FY 2004 LDRD Report to Congress More Documents & Publications FY 2005

    9 Office of Management, Budget and Evaluation/CFO February 2004 Budget

  2. FY16-FY20 Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -FY20 Strategic Plan Exceptional service in the national interest Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. SAND2015-6199 dp. www.strategicplan.sandia.gov 8/3/2015C www.strategicplan.sandia.gov 1 Message from the President

  3. FY 2015 Statistical Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy FY 2015 Statistical Table by Organization (dollars in thousands - OMB Scoring) Statistical Table by Organization Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY 2015 Current Enacted Adjustments Current Congressional Approp. Approp. Approp. Request Discretionary Summary By Organization National Nuclear Security Administration Weapons Activities........................................................................... 6,966,855 7,781,000 ---- 7,781,000 8,314,902

  4. FTCP Quarterly Indicator Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Indicator Reports FTCP Quarterly Indicator Reports March 4, 2016 FTCP Quarterly Report on Federal Technical Capability, March 2, 2016 This Quarterly Report on the Federal ...

  5. Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

  6. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  7. Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  8. FY06 AR

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    f i c e o f F o s s i l E n e r g y N a t i o n a l E n e r g y T e c h n o l o g y L a b o r a t o r y ACCOMPLISHMENTS NETL Accomplishments FY 2006 2 NETL Accomplishments FY 2006 3 MESSAGE FROM THE DIRECTOR For 200 years, America's energy demands have grown at a remarkable rate. As we have moved from an agricultural society, through industrial expansion, and into the current technological era, our society's transformation has depended on reliable, affordable energy supplies. Energy reliance is

  9. FY 2012 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Department of Energy FY 2012 Congressional Budget Request Laboratory Tables y Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0065 Department of Energy FY 2012 Congressional Budget Request Laboratory Tables P li i Preliminary h b d i d i hi d h l l f b d h i f h The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider

  10. FY 2013 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Department of Energy FY 2013 Congressional Budget Request Laboratory Tables y Preliminary February 2012 Office of Chief Financial Officer DOE/CF-0078 Department of Energy FY 2013 Congressional Budget Request Laboratory Tables P li i Preliminary h b d i d i hi d h l l f b d h i f h The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider

  11. FY 2014 Budget Request State Table | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Table FY 2014 Budget Request State Table PDF icon State Table FY2014.pdf More Documents & Publications FY 2014 Budget Request Laboratory Table FY 2007 Congressional Budget Request FY 2007 Congressional

  12. Quarterly coal report

    SciTech Connect (OSTI)

    Young, P.

    1996-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1995 and aggregated quarterly historical data for 1987 through the third quarter of 1995. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  13. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2007.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2008-01-24

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1 - December 31, 2007, for the fixed sites and the mobile site. The AMF has been deployed to Germany and this was the final operational quarter. The first quarter comprises a total of 2,208 hours. Although the average exceeded our goal this quarter, a series of severe weather events (i.e., widespread ice storms) disrupted utility services, which affected the SGP performance measures. Some instruments were covered in ice and power and data communication lines were down for more than 10 days in some areas of Oklahoma and Kansas, which resulted in lost data at the SGP site. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. The AMF completed its mission at the end of this quarter in Haselback, Germany (FKB designation). NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request an account on the local site data system. The eight research computers are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the DMF at PNNL; and the AMF, currently in Germany. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Due to the similarity of ACRF NSA data streams, and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period January 1, 2007 - December 31, 2007. Table 2 shows the summary of cumulative users for the period January 1, 2007 - December 31, 2007. For the first quarter of FY 2008, the overall number of users was up significantly from the last reporting period. For the fourth consecutive reporting period, a record high number of Archive users was recorded. In addition, the number of visitors and visitor days set a new record this reporting period particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany. It is interesting to note this quarter that 22% (a slight decrease from last quarter) of the Archive users are ARM Science funded principal investigators and 35% (the same as last quarter) of all other facility users are either ARM Science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period October 1 - December 31, 2007. There were no incidents this reporting period.

  14. Environmental Compliance Performance Scorecard- First Quarter FY2015

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  15. Environmental Compliance Performance Scorecard- Third Quarter FY2014

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  16. Environmental Compliance Performance Scorecard – Third Quarter FY2013

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  17. Microsoft Word - NHI Quarterly FY10-01.doc

    Office of Scientific and Technical Information (OSTI)

    ... Ce MNN Normalized Intensity Binding Energy (eV) stack 3 - cell 10 - hydrogen electrode XPS Mg K Ni 3p Ce 4d C 1s Ni LMM Mn 2p O 1s O KLL Ni 2p Ce 3d C KLL exhaust inlet Figure ...

  18. Environmental Compliance Performance Scorecard- Second Quarter FY2015

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  19. Environmental Compliance Performance Scorecard – Second Quarter FY2012

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  20. Battle energy business report, third quarter, FY 1994

    SciTech Connect (OSTI)

    Lang, K.S.

    1994-08-01

    In June, the House passed the Interior Appropriations bill, which contains some of DOE`s budget requests. The Senate approved a similar bill during the last week in July. The July 4 issue of Inside Energy reports the Senate bill {open_quotes}would provide $743.7 million for energy efficiency programs, roughly $53.4 million over the current appropriation of $690.4 million. DOE had sought $976.8 million and the House voted $824.6.{close_quotes} The two bills will now go into conference to resolve their differences.

  1. Environmental Compliance Performance Scorecard – Third Quarter FY2012

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  2. Environmental Compliance Performance Scorecard – Third Quarter FY2011

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  3. Environmental Compliance Performance Scorecard – First Quarter FY2013

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  4. Environmental Compliance Performance Scorecard – Second Quarter FY2013

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones.

  5. Environmental Compliance Performance Scorecard – First Quarter FY2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  6. Quarterly SSP Experiment Summary-Q1FY14 1

    National Nuclear Security Administration (NNSA)

    ... properties and reactions of chemical explosives, as well as gas guns to study materials. ... fundamental properties and reactions of chemical explosives, detonators, and to conduct ...

  7. PBL FY 2002 Third Quarter Review Forecast of Generation Accumulated...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revenue Basis. The FB CRAC Revenue Basis is the total generation revenue (not including LB CRAC) for the loads subject to FB CRAC plus Slice loads, for the year in which the FB...

  8. Federal Columbia River Power System (FCRPS) FY 2011 THIRD QUARTER...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    potential financial results that could occur by the end of the year, mainly a result of water conditions and short-term market prices, both of which can affect net secondary...

  9. Frist Quarter pacakge FY 2013 (final).xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    debt. 3 Adjusted Net Revenues is calculated by adding Power Services and Transmission Services Net Revenues. 4 Financial reserves equal total cash plus deferred borrowing and...

  10. Environmental Compliance Performance Scorecard – Second Quarter FY2010

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  11. FY 2004 Second Quarter Review Forecast of Generation Accumulated...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration Power Business Line Generation (PBL) Accumulated Net Revenue Forecast for Financial-Based Cost Recovery Adjustment Clause (FB CRAC) and Safety-Net...

  12. PBL FY 2003 Third Quarter Review Forecast of Generation Accumulated...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2003 Bonneville Power Administration Power Business Line Generation Accumulated Net Revenue Forecast for Financial-Based Cost Recovery Adjustment Clause (FB CRAC) and Safety-Net...

  13. Environmental Compliance Performance Scorecard – First Quarter FY2011

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  14. Environmental Compliance Performance Scorecard – Second Quarter FY2011

    Broader source: Energy.gov [DOE]

    The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard’s timeliness and completeness, the dynamic...

  15. Directives Quarterly Updates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

  16. QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    1Q) 1991 1 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION February 1991 This publication may be purchased from the Superintendent of ...

  17. QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    >OEEIA-0202(923Q) 1992 3 QUARTER SHORT-TERM ENERGY OUTLOOK QUARTERLY PROJECTIONS ENERGY INFORMATION ADMINISTRATION August 1992 This publication and other Energy Information ...

  18. FY 14-15 ASC Utility Filings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2014-2015 Final ASC Reports FY 2014-2015 Appendix 1 Template FY 2014-2015 Forecast Model Rules of Business Procedures for BPA's ASC Review Process (Revised May 2012)...

  19. Performance Period Total Fee Paid FY2001

    Office of Environmental Management (EM)

    FY2001 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400

  20. FY 2012 Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Summary Control Table by Organization (dollars in thousands - OMB Scoring) FY 2010 FY ... FY10 Current Approp for all programs including NNSA Control table by organization Page 1 ...

  1. FY 2015 Statistical Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) Statistical Table by Appropriation Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY 2015 Current Enacted Adjustment Current Congressional Approp. Approp. Approp. Request Discretionary Summary By Appropriation Energy And Water Development And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy............................... 1,691,757 1,900,641 ---- 1,900,641

  2. FY 2015 Summary Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Control Table by Appropriation (dollars in thousands - OMB Scoring) Summary Control Table by Appropriation Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY 2015 Current Enacted Adjustment Current Congressional Approp. Approp. Approp. Request Discretionary Summary By Appropriation Energy And Water Development And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy................................... 1,691,757 1,900,641 ----

  3. EERE FY 2016 Budget Overview -- Sustainable Transportation |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Transportation EERE FY 2016 Budget Overview -- Sustainable Transportation Office of Energy Efficiency and Renewable Energy FY 2016 Budget Overview -- Sustainable...

  4. Fossil Energy FY 2015 Budget in Brief

    Broader source: Energy.gov [DOE]

    Fossil Energy FY 2015 Budget in Brief document gives highlights to the budget request for the FY 2015 budget request for the Office of Fossil Energy.

  5. Work Plan FY 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plan FY 2016 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 A list of audits and inspections planned for FY 2016 by the U.S. Department of Energy, Office of Inspector General, Office of Audits and Inspections PDF icon Work Plan FY 2016 More Documents & Publications Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Planned Audits and Inspections FY 2013 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs

  6. FY 2008 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2008 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2008 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  7. FY 2010 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2010 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2010 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  8. FY 2009 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2009 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2009 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  9. FY 2006 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2006 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2006 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  10. FY 2007 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2007 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2007 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  11. FY 2011 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2011 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2011 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  12. FY 2006 Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Page 1 Department of Energy FY 2006 Control Table by Appropriation (dollars in thousands - ... Page 2 300 Department of Energy FY 2006 Control Table by Appropriation (dollars in ...

  13. FY 2006 Control Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Page 1 Department of Energy FY 2006 Control Table by Organization (dollars in ... Page 2 Department of Energy FY 2006 Control Table by Organization (dollars in ...

  14. Tanks focus area multiyear program plan - FY96-FY98

    SciTech Connect (OSTI)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

  15. National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 PDF icon National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 More Documents & Publications Facilities and Infrastructure Program FY 2017 Budget At-A-Glance Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan NREL Annual Environmental Performance Reports (Annual Site

  16. Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan | Department of Energy 2 Annual Performance Report and FY 2003 Annual Performance Plan Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2002 actual performance and FY 2003 planned activities. PDF icon Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan More Documents & Publications Annual Performance

  17. Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 6 Annual Performance Results and FY 2007 Annual Performance Plan Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2006 actual performance and FY 2007 planned activities. PDF icon

  18. Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 7 Annual Performance Results and FY 2008 Annual Performance Plan Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2007 actual performance and FY 2008 planned activities. PDF icon

  19. Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 9 Annual Performance Results and FY 2010 Annual Performance Plan Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2009 actual performance and FY 2010 planned activities. PDF icon

  20. Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 0 Annual Performance Results and FY 2011 Annual Performance Plan Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2010 actual performance and FY 2011 planned activities. PDF icon

  1. Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 1 Annual Performance Results and FY 2012 Annual Performance Plan Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities. PDF icon

  2. Fourth Fridays Downtown - Exploring the Solar System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays Downtown - Exploring the Solar System Fourth Fridays Downtown - Exploring the Solar System WHEN: May 22, 2015 4:00 PM - 6:00 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, NM 87544, USA CONTACT: Jessica Privette 505 667-0375 CATEGORY: Bradbury INTERNAL: Calendar Login Fourth Fridays Downtown Event Description Fourth Fridays are sponsored by the Los Alamos Creative District. The Los Alamos Creative District is introducing Fourth Fridays, an initiative for local

  3. FY16 Projects.xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY16 Budget Rollout Fact Sheet FY16 Budget Rollout Fact Sheet Download the fact sheet below to read the full highlights of the President's FY 2016 Budget for the Department of Energy, which provides $30 billion to support the Department in the areas of nuclear security, clean energy, environmental cleanup, climate change response, science and innovation. This includes: Supporting a nearly $5 billion all-of-the-above transformational research and development portfolio in critical energy

  4. FY 2009 Volume Summary table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy.......................... -- 1,722,407 1,255,393 -467,014 -27.1% Electricity delivery and energy reliability........................... -- 138,556 134,000 -4,556 -3.3% Nuclear

  5. NA-ASC-500-13 Issue 26 ASC eNews Quarterly Newsletter

    National Nuclear Security Administration (NNSA)

    NA-ASC-500-13 Issue 26 ASC eNews Quarterly Newsletter December 2013 2 shutdown. But the two-year budget agreement is not an appropriation, so we must await final appropriations for both FY14 and FY15. The President also signed the National Defense Authorization Act into law, which directs NNSA to develop and carry out a plan to incorporate exascale computing in the Stockpile Stewardship Program. This is not an exascale program, but recognition that stockpile stewardship requires exascale

  6. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

    SciTech Connect (OSTI)

    Sisterson, D. L.

    2008-10-08

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period October 1, 2007 - September 30, 2008. Table 2 shows the summary of cumulative users for the period October 1, 2007 - September 30, 2008. For the fourth quarter of FY 2008, the overall number of users is down substantially (about 30%) from last quarter. Most of this decrease resulted from a reduction in the ACRF Infrastructure users (e.g., site visits, research accounts, on-site device accounts, etc.) associated with the AMF China deployment. While users had easy access to the previous AMF deployment in Germany that resulted in all-time high user statistics, physical and remote access to on-site accounts are extremely limited for the AMF deployment in China. Furthermore, AMF data have not yet been released from China to the Data Management Facility for processing, which affects Archive user statistics. However, Archive users are only down about 10% from last quarter. Another reason for the apparent reduction in Archive users is that data from the Indirect and Semi-Direct Aerosol Campaign (ISDAC), a major field campaign conducted on the North Slope of Alaska, are not yet available to users. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period July 1 - September 30, 2008. There were no incidents this reporting period.

  7. FY 2011 Agency Performance Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Energy: Hydrogen & Fuel Cell Technologies 180 2 Biomass ... of a performance-based culture that clearly links work to ... Moving forward, the Program will employ techniques in FY ...

  8. The FY 2006 budget request

    SciTech Connect (OSTI)

    Garman, David

    2005-02-07

    This presentation provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2006 budget request to Congress.

  9. FY 2014 Budget Performance Supplement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CF-0145 FY 2015 DOE ANNUAL PERFORMANCE REPORT 2 | P a g e Contents Introduction .................................................................................................................................. 3 DOE Organization ........................................................................................................................... 3 Strategic Framework....................................................................................................................... 3

  10. FY 2014 Budget Rollout Presentation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fossil Energy FY 2016 Budget Request Office of Fossil Energy Christopher Smith Assistant Secretary Office of Fossil Energy February 2, 2015 Office of Fossil Energy Meeting the ...

  11. The FY 2006 Budget Request

    Broader source: Energy.gov [DOE]

    This presentation provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2005 budget request to Congress.

  12. DOE/SC-ARM-11-001 ARM Climate Research Facility Quarterly Instrument Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 ARM Climate Research Facility Quarterly Instrument Report Fourth Quarter: October 1-December 30, 2010 JW Voyles January 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

  13. Planned Audits and Inspections FY 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planned Audits and Inspections FY 2013 Planned Audits and Inspections FY 2013 Work Plan for FY 2013 A list of audits and inspections planned for FY 2013 by the U.S. Department of Enery, Office of Inspector General, Office of Audits and Inspections PDF icon Planned Audits and Inspections for FY 2013 More Documents & Publications Work Plan FY 2016 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Combined Fiscal Year (FY) 2012 Annual Performance

  14. FY 2007 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Monthly Reports - FY 2007 The Department of Energy Nevada Field Office Environmental Management Program creates monthly reports for the NSSAB. These reports cover the completed activities for the current month and the expectations for the following month. Should you have questions about the EM Monthly Reports please contact envmgt@nv.doe.gov or call (702) 295-3521. October 2006 November 2006 December 2006 January 2007 February 2007 March 2007 April 2007 May 2007 June

  15. FY 2008 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Monthly Reports - FY 2008 The Department of Energy Nevada Field Office Environmental Management Program creates monthly reports for the NSSAB. These reports cover the completed activities for the current month and the expectations for the following month. Should you have questions about the EM Monthly Reports please contact envmgt@nv.doe.gov or call (702) 295-3521. October 2007 November 2007 December 2007 January 2008 February 2008 March 2008 April 2008 May 2008 June

  16. FY 2009 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Monthly Reports - FY 2009 The Department of Energy Nevada Field Office Environmental Management Program creates monthly reports for the NSSAB. These reports cover the completed activities for the current month and the expectations for the following month. Should you have questions about the EM Monthly Reports please contact envmgt@nv.doe.gov or call (702) 295-3521. October 2008 November 2008 December 2008 January 2009 February 2009 March 2009 April 2009 May 2009 June

  17. FY 2010 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Monthly Reports - FY 2010 The Department of Energy Nevada Field Office Environmental Management Program creates monthly reports for the NSSAB. These reports cover the completed activities for the current month and the expectations for the following month. Should you have questions about the EM Monthly Reports please contact envmgt@nv.doe.gov or call (702) 295-3521. October 2009 November 2009 December 2009 January 2010 February 2010 March 2010 April 2010 May 2010 June

  18. FY 2011 Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Monthly Reports - FY 2011 The Department of Energy Nevada Field Office Environmental Management Program creates monthly reports for the NSSAB. These reports cover the completed activities for the current month and the expectations for the following month. Should you have questions about the EM Monthly Reports please contact envmgt@nv.doe.gov or call (702) 295-3521. October 2010 November 2010 December 2010 January 2011 February 2011 March 2011 April 2011 May 2011 June

  19. FY 2012 Volume 3

    Energy Savers [EERE]

    1 Service Contract Inventory Analysis Plan Department of Energy Office of Procurement & Assistance Management Strategic Programs Division (MA-622) December 2011 Department of Energy FY 2011 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)) and Appendix D of the November 5, 2010 OMB Memorandum on Service Contract

  20. FY 2006 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 Laboratory Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals,

  1. FY 2006 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO February 2005 State Tables Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or

  2. FY 2007 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    state tables preliminary Department of Energy FY 2007 Congressional Budget Request February 2006 Printed with soy ink on recycled paper Office of Chief Financial Officer state tables preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other

  3. FY 2008 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Table Preliminary Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer Laboratory Table Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other

  4. FY 2008 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Table Preliminary Department of Energy FY 2008 Congressional Budget Request February 2007 Office of Chief Financial Officer State Table Preliminary Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, uses of prior year balances, deferrals, rescissions, or other adjustments

  5. FY 2009 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE

  6. FY 2009 Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Performance and financial information FY 2009 DOE/CF-0045 The Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports in order to provide performance, financial and related information in a more meaningful and useful format. In accordance with the Act, the Department of Energy (Department or DOE), has produced a consolidated Performance and Accountability Report (PAR) in previous years. For

  7. FY 2009 Volume 7

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 DOE/CF-030 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Clean Coal Technology Ultra-Deepwater Unconventional Natural Gas February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request Volume 7 DOE/CF-030 Volume 7 Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil

  8. FY 2010 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Preliminary May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Laboratory Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by

  9. FY 2010 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Preliminary May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE appropriations by the

  10. FY 2010 Volume 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 DOE/CF-040 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration May 2009 Office of Chief Financial Officer FY 2010 Congressional Budget Request Volume 6 DOE/CF-040 Volume 6 Power Marketing Administrations Southeastern Power Administration Southwestern Power Administration Western Area Power Administration Bonneville Power Administration Printed with soy ink on recycled

  11. FY 2011 Laboratory Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Tables Department of Energy FY 2011 Congressional Budget Request DOE/CF-0055 March 2010 Office of Chief Financial Officer Laboratory Tables Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments

  12. FY 2011 State Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Tables Department of Energy FY 2011 Congressional Budget Request DOE/CF-0054 March 2010 Office of Chief Financial Officer State Tables Printed with soy ink on recycled paper The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated

  13. FY 2013 Volume 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 DOE/CF-0073 Volume 3 Printed with soy ink on recycled paper Department of Energy FY 2013 Congressional Budget Request Energy Efficiency and Renewable Energy Electricity Delivery and Energy Reliability Nuclear Energy Fossil Energy Research and Development Naval Petroleum and Oil Shale Reserves Strategic Petroleum Reserve Northeast Home Heating Oil Reserve Ultra-Deepwater Unconventional Natural Gas Elk Hills Lands Fund Advanced Tech. Vehicle Manufacturing Loan Program Title 17 Innovative Tech.

  14. FY16 Deadlines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Deadlines CSES FY16 Deadlines High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contacts Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia Sanchez 665-0855 Email DATE DETAILS Feb. 8 CSES 2016 Call for Proposals released March 11 CSES Emerging Ideas PD proposals due April 4 CSES Student Fellow Program and CSES Postdoctoral Fellow Program proposals due May 1 Abstract submission for the

  15. FY16 Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Events CSES FY16 Events High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Past events 2015 Conferences, Symposiums DATE/TIME EVENT LOCATION DETAILS September 12-16, 2016 3rd International Symposium on Recent Observations and Simulations of the Sun-Earth System (ISROSES-III) Symposium poster (pdf) Golden Sands, Bulgaria The purpose of the Symposium is to improve present understanding of the complex, multi-scale,

  16. FY-92 Report

    Office of Legacy Management (LM)

    FY-92 Report on the Isotope Hydrology Characterization of the Faultless Test Site, Nye County, Nevada by M. L. Davisson G. 1. Nimz G. B. Hudson D. K. Smith J. H. Rego J. M. Kenneally Nuclear Chemistry Division Lawrence Livermore National Laboratory MASTER 1 ABSTRACT Recent sampling and isotopic analysis of groundwater by LLNL at the Faultless test site in Hot Creek Valley, Nevada, and close examination of previous hydrochemistry measurements by the USGS show that the similar Na-HC03 groundwater

  17. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This report is the 1992--1994 Program Director`s Overview Report for Oak Ridge National Laboratory`s (ORNL`s) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  18. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  19. Combined Fiscal Year (FY) 2006 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2006 Annual Performance Results and FY 2007 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2006 Annual ...

  20. Combined Fiscal Year (FY) 2007 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2007 Annual Performance Results and FY 2008 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2007 Annual ...

  1. Combined Fiscal Year (FY) 2010 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2010 Annual ...

  2. Combined Fiscal Year (FY) 2009 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual ...

  3. Combined Fiscal Year (FY) 2011 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2011 Annual ...

  4. Microsoft Word - FY2005finaliparhandbook.doc | Department of...

    Energy Savers [EERE]

    Microsoft Word - FY2005finaliparhandbook.doc Microsoft Word - FY2005finaliparhandbook.doc Microsoft Word - FY2005finaliparhandbook.doc More Documents & Publications...

  5. DOE FY 2012 Budget Overview presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2012 Budget Overview presentation DOE FY 2012 Budget Overview presentation File fy12budgetrollout02-14-11finalfordistribution-110214100000-phpapp01.pptx More Documents & ...

  6. FY 2014 Budget Request Statistical Table | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table FY 2014 Budget Request Statistical Table PDF icon Stats Table FY2014.pdf More Documents & Publications FY 2009 Environmental Management Budget Request to Congress ...

  7. Integrated Disposal Facility FY 2012 Glass Testing Summary Report

    SciTech Connect (OSTI)

    Pierce, Eric M.; Kerisit, Sebastien N.; Krogstad, Eirik J.; Burton, Sarah D.; Bjornstad, Bruce N.; Freedman, Vicky L.; Cantrell, Kirk J.; Snyder, Michelle MV; Crum, Jarrod V.; Westsik, Joseph H.

    2013-03-29

    PNNL is conducting work to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility for Hanford immobilized low-activity waste (ILAW). Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program, PNNL is implementing a strategy, consisting of experimentation and modeling, to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. Key activities in FY12 include upgrading the STOMP/eSTOMP codes to do near-field modeling, geochemical modeling of PCT tests to determine the reaction network to be used in the STOMP codes, conducting PUF tests on selected glasses to simulate and accelerate glass weathering, developing a Monte Carlo simulation tool to predict the characteristics of the weathered glass reaction layer as a function of glass composition, and characterizing glasses and soil samples exhumed from an 8-year lysimeter test. The purpose of this report is to summarize the progress made in fiscal year (FY) 2012 and the first quarter of FY 2013 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of LAW glasses.

  8. Commercial LFCM vitrification technology. Quarterly progress report, October-December 1984

    SciTech Connect (OSTI)

    Burkholder, H.C.; Jarrett, J.H. (comps.)

    1985-07-01

    This report is the first in a series of quarterly reports compiled by the Nuclear Waste Treatment Program Office at Pacific Northwest Laboratory to document progress on commercial liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the first quarter of FY 1985 is discussed: pretreatment systems, melting process chemistry, glass development and characterization, feed preparation and transfer systems, melter systems, canister filling and handling systems, off-gas systems, process/product modeling and control, and supporting studies. 33 figs., 12 tabs.

  9. Lessons Learned Quarterly Report, December 2014 | Department...

    Energy Savers [EERE]

    Lessons Learned Quarterly Report, December 2014 Lessons Learned Quarterly Report, December 2014 Welcome to the 81st quarterly report on lessons learned in the NEPA process. This...

  10. EIA -Quarterly Coal Distribution

    U.S. Energy Information Administration (EIA) Indexed Site

    U.S. domestic coal distribution by coal origin, coal destination, mode of transportation ... YearQuarters By origin State By destination State Report Data File Report Data File 2009 ...

  11. Quarterly report on program cost and schedule, third quarter FY 1990

    SciTech Connect (OSTI)

    1990-10-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from final Financial Information System (FIS) reports) are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1990. 1 fig.

  12. Lessons Learned Quarterly Report, Issue No. 32; Third Quarter FY 2002 (September 3, 2002)

    Office of Environmental Management (EM)

    Energy Apps for Energy! Developers, Are You Ready? Launching Apps for Energy! Developers, Are You Ready? April 5, 2012 - 4:00pm Addthis Apps for Energy is open for submissions. Sign-up at appsforenergy.challenge.gov. Erin R. Pierce Erin R. Pierce Former Digital Communications Specialist, Office of Public Affairs What are the key facts? Today, the Energy Department's Apps for Energy competition is open for submissions. Apps for Energy leverages Green Button -- an open standard for sharing

  13. Fourth Fridays Downtown - Working with Wind

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays Downtown - Working with Wind Fourth Fridays Downtown - Working with Wind WHEN: Jun 26, 2015 12:00 AM - 11:59 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, New Mexico, USA CONTACT: Jessica Privette 505 667-0375 CATEGORY: Bradbury INTERNAL: Calendar Login Fourth Fridays Downtown Event Description The museum will be open late until 6pm every Fourth Friday offering extended access to exhibits, special programming, and activities. The Los Alamos Creative District is

  14. Actinide Research Quarterly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARQ A publication of the Glenn T. Seaborg Institute for Transactinium Science. Latest Issue:August 2015 ARQ past issues covers All Issues » submit Actinide Research Quarterly (ARQ) ARQ is a publication of the Glenn T. Seaborg Institute for Transactinium Science, a part of the LANL National Security Education Center. The Actinide Research Quarterly reports on research in actinide science in areas such as process chemistry, metallurgy, surface and separation sciences, atomic and molecular

  15. FY 2006 Summary Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget by Organization (discretionary dollars in thousands) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Discretionary Summary By Organization National Security Weapons............................................................... 6,447,159 6,583,350 6,630,133 +46,783 +0.7% Defense Nuclear Nonproliferation.......................... 1,367,709 1,422,103 1,637,239 +215,136 +15.1% Naval

  16. FY 2012 Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2012 Summary Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2010 FY 2011 FY 2011 FY 2012 Current Congressional Annualized Congressional Approp. Request CR Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy....................................... 2,216,392 2,355,473 2,242,500 3,200,053 +983,661 +44.4% Electricity delivery and energy

  17. FY 2017 Statistical Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Organization (dollars in thousands - OMB Scoring) Statistical Table by Organization Page 1 FY 2017 Congressional Budget Justification FY 2015 FY 2015 FY 2016 FY 2017 Enacted Current Enacted Congressional Approp. Approp. Approp. Request $ % Discretionary Summary By Organization National Nuclear Security Administration Weapons Activities................................................................................. 8,180,359 8,180,609 8,846,948 9,243,147 +396,199 +4.5% Defense Nuclear

  18. FY 2008 & FY 2009 Proposed Loan Guarantee Solicitation Implementation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy FY 2008 & FY 2009 Proposed Loan Guarantee Solicitation Implementation Plan FY 2008 & FY 2009 Proposed Loan Guarantee Solicitation Implementation Plan PDF icon FY 2008 & FY 2009 Proposed Loan Guarantee Solicitation Implementation Plan More Documents & Publications 2009 Recovery Act IMPLEMENTATION UPDATE Microsoft Word - 48D7DF19-707E-28B27A.doc Statement Before the Senate Energy and Natural Resources Committee

  19. National Renewable Energy Laboratory 10 Year Site Plan FY 2007...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 National Renewable Energy Laboratory 10 Year Site Plan FY 2007 - FY 2018 PDF icon National Renewable Energy ...

  20. FE FY 2015 Budget Request Presentation | Department of Energy

    Energy Savers [EERE]

    5 Budget Request Presentation FE FY 2015 Budget Request Presentation File fy15_budget_rollout.pptx More Documents & Publications FE FY 2017 BUDGET REQUEST PRESENTATION FE FY 2016

  1. FE FY 2016 BUDGET REQUEST PRESENTATION | Department of Energy

    Energy Savers [EERE]

    6 BUDGET REQUEST PRESENTATION FE FY 2016 BUDGET REQUEST PRESENTATION PDF icon FY16_budget_rollout 2-2-15.pdf More Documents & Publications FE FY 2015 Budget Request Presentation FE FY 2017

  2. Richland Operations Office FY 14/15 Funding Marks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office FY 1415 Funding Marks PBS PBS Title FY 2014 Omnibus (Enacted) FY 2015 President's Budget FY 2015 Omnibus Allocation RL-0011 NM Stabilization and Disposition - PFP 142,670...

  3. Fossil Energy FY 2013 Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Fossil Energy FY 2013 Budget More Documents & Publications Details of the FY 2014 Budget Request for FE Fossil Energy FY 2012 Budget FY 2014 Budget Request Statistical ...

  4. Annual Performance Report FY 2004 Annual Performance Plan FY 2005,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE/IG-APP-007 | Department of Energy 4 Annual Performance Plan FY 2005, DOE/IG-APP-007 Annual Performance Report FY 2004 Annual Performance Plan FY 2005, DOE/IG-APP-007 I am pleased to present the Office of Inspector General's (OIG's) combined Fiscal Year 2004 Annual Performance Report and Fiscal Year 2005 Annual Performance Plan. In Fiscal Year 2004, the Department was ranked first among all cabinet agencies in implementing the President's Management Agenda. We are proud to have played a

  5. U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act

    Energy Savers [EERE]

    Third Quarter FY 2015 September 1, 2015; Issue No. 84 NEPA Lessons Learned September 2015 1 Programmatic EIS Posed Many Challenges, Offers Immediate and Lasting Benefits By: Matt Marsh, Mark Wieringa, and Micah Reuber, Western Area Power Administration Programmatic consideration of environmental impacts and mitigation is a pathway to streamlining NEPA review. The proposals in this example share a common technology (wind energy), geographic scope (upper Midwestern states), and federal action

  6. U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act

    Energy Savers [EERE]

    First Quarter FY 2016 March 1, 2016; Issue No. 86 NEPA Lessons Learned March 2016 1 Kedric Payne (left); Suzi Ruhl; Melinda Downing, DOE Environmental Justice Program Manager; and Denise Freeman participated in the Collaborative Conversation on EJ. (continued on page 4) Expand Your EJ Toolkit To Enhance NEPA Reviews Seeking to "provide the groundwork for a renewed and dynamic process to advance environmental justice principles through NEPA implementation and thereby promote a more

  7. NREL Photovoltaic Program FY 1993

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This report reviews the in-house and subcontracted research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaic (PV) Program from October 1, 1992, through September 30, 1993 (fiscal year [FY] 1993). The NREL PV Program is part of the U.S. Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The FY 1993 budget authority (BA) for carrying out the NREL PV Program was $40.1 million in operating funds and $0.9 million in capital equipment funds. An additional $4.8 million in capital equipment funds were made available for the new Solar Energy Research Facility (SERF) that will house the in-house PV laboratories beginning in FY 1994. Subcontract activities represent a major part of the NREL PV Program, with more than $23.7 million (nearly 59%) of the FY 1993 operating funds going to 70 subcontractors. In FY 1993, DOE assigned certain other PV subcontracting efforts to the DOE Golden Field Office (DOE/GO), and assigned responsibility for their technical support to the NREL PV Program. An example is the PV:BONUS (Building Opportunities in the U.S. for Photovoltaics) Project. These DOE/GO efforts are also reported in this document.

  8. ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 October 1, 2013 - 2:09pm Addthis ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 ENERGY EFFICIENCY AND RENEWABLE ENERGY REPORT - FY 2013 In 2013

  9. ARI Quarterly Newsletter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARI Quarterly Newsletter ARI Quarterly Newsletter PDF icon FINAL ARI Quarterly - 23 Sep 2013.pdf More Documents & Publications ARI Quarterly Newsletter ARI: Creating a 2020 DOE ARI Brochure Revitalizing American Competitiveness in Solar Technologies

  10. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  11. FY 2008 E-Government Act Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    08 E-Government Act Report FY 2008 E-Government Act Report FY 2008 E-Government Act Report PDF icon FY 2008 E-Government Act Report More Documents & Publications FY 2008 E-Government Act Report FY 2009 E-Government Act Report FY 2007 Annual Uncosted Balances

  12. FY 2017 EM Budget Rollout Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 EM Budget Rollout Presentation FY 2017 EM Budget Rollout Presentation FY 2017 EM Budget Rollout Presentation Office of Environmental Management Monica Regalbuto, Assistant Secretary for Environmental Management February 9, 2016 PDF icon FY 2017 EM Budget Rollout Presentation More Documents & Publications FY 2016 EM Budget Rollout Presentation FY 2014 EM Budget Rollout Presentation FY 2015 EM Budget Rollout Presentation

  13. FY2016 Budget At-A-Glance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY2016 Budget At-A-Glance FY2016 Budget At-A-Glance PDF icon FY16 Budget At-A-Glance-GTO.pdf More Documents & Publications Geothermal Technologies Office FY 2017 Budget At-A-Glance FY2016 Budget At-A-Glance 2015 Annual Report, Geothermal Technologies Office Geothermal Technologies Office FY 2016 Budget At-A-Glance

  14. FE Budget-in-Brief FY 2014 | Department of Energy

    Energy Savers [EERE]

    Budget-in-Brief FY 2014 FE Budget-in-Brief FY 2014 PDF icon Fossil Energy Budget-in-Brief for FY 2014 More Documents & Publications Fossil Energy FY 2015 Budget in Brief Fossil Energy FY 2013 Budget-in-Brief FE FY 2017 BUDGET REQUEST PRESENTATION

  15. Fossil Energy FY 2010 Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Budget Fossil Energy FY 2010 Budget Fossil Energy's FY 2010 budget, including request, House and Senate marks, and final appropriation. PDF icon Fossil Energy FY 2010 Budget More Documents & Publications Fossil Energy FY 2011 Budget Fossil Energy FY 2009 Budget FY 2014 Funding History Detail Spreadsheet

  16. Fossil Energy FY 2011 Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Budget Fossil Energy FY 2011 Budget Fossil Energy's FY 2011 budget request, House and Senate marks, and final appropriation. PDF icon Fossil Energy FY 2011 Budget More Documents & Publications Fossil Energy FY 2010 Budget Fossil Energy FY 2009 Budget FY 2012 Budget Justification

  17. Fossil Energy FY 2014 Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fossil Energy FY 2014 Budget Fossil Energy FY 2014 Budget Documents and information related to the Fossil Energy FY 2014 budget. Fossil Energy FY 2014 Budget-in-Brief Office of Fossil Energy Techline - April 10, 2013 Detailed FY 2014 Budget Jusifications for FE Department of Energy's Complete FY 2014 Budget Request

  18. Short-term energy outlook quarterly projections. Third quarter 1997

    SciTech Connect (OSTI)

    1997-07-01

    This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

  19. Basalt Waste Isolation Project. Quarterly report, July 1, 1980-September 30, 1980

    SciTech Connect (OSTI)

    Deju, R.A.

    1980-11-01

    This report presents the technical progress for the Basalt Waste Isolation Project for the fourth quarter of fiscal year 1980. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration; geosciences; hydrology; engineered barriers; near-surface test facility; engineering testing; and repository studies. Summaries of major accomplishments for each of these areas are reported.

  20. quarterly | OpenEI Community

    Open Energy Info (EERE)

    quarterly Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 15 March, 2013 - 10:23 Quarterly Smart Grid Data available for download on OpenEI data download...

  1. FY2016-Preliminary-Project-Packet.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY2016 Budget At-A-Glance FY2016 Budget At-A-Glance PDF icon FY16 Budget At-A-Glance-GTO.pdf More Documents & Publications Geothermal Technologies Office FY 2017 Budget At-A-Glance FY2016 Budget At-A-Glance 2015 Annual Report, Geothermal Technologies Office Geothermal Technologies Office FY 2016 Budget At-A-Glance National Nuclear Security Administration

    6 Budget Request: Positioned for the 21st Century Mission Delivery February 02, 2015 Washington, DC - U.S. Department of Energy

  2. FY 2012 Agency Financial Report

    Office of Environmental Management (EM)

    ... Based on our internal evaluations, I can provide reasonable ... research on using waste CO 2 to make commercial ... In FY 2012, DOE finished 2,000 hours of post-combustion CO 2 ...

  3. ARM - ARM Operations Quarterly Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Quarterly Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  4. FY 2015 Service Contract Inventory

    Energy Savers [EERE]

    of Energy FY 2015 Service Contract Inventory Analysis Plan Department of Energy Office of Acquisition Management Strategic Programs Division (MA-622) January 2016 Department of Energy FY 2015 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)), Appendix D of the November 5, 2010 OMB Memorandum on Service Contract Inventories,,

  5. FY 2015 Service Contract Inventory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy FY 2015 Service Contract Inventory Analysis Plan Department of Energy Office of Acquisition Management Strategic Programs Division (MA-622) January 2016 Department of Energy FY 2015 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)), Appendix D of the November 5, 2010 OMB Memorandum on Service Contract Inventories,,

  6. FY 2016 PMCDP Training Schedule

    Energy Savers [EERE]

    Last Update February 29, 2016 1 | P a g e FY 2016 PMCDP Training Schedule Q1 FY 2016: Course Title Length Planned Delivery Timeframe Location/ Platform Equivalent Training Planning for Safety in Project Management FPM 408 CHRIS Code: 001035/0058 28 CLPs November (start) NA/desktop delivery None; DOE custom course required Facilitating Conflict Resolution FLD 141 CHRIS Code: 01558/0019 24 CLPs November 12(start) 22 completed NA/desktop delivery None; DOE custom course required Managing Contract

  7. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  8. Fourth Fridays Downtown - Under the Microscope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Fridays Downtown - Under the Microscope Fourth Fridays Downtown - Under the Microscope WHEN: Jul 24, 2015 4:00 PM - 6:00 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, NM 87544, USA CONTACT: Jessica Privette 505 667-0375 CATEGORY: Bradbury INTERNAL: Calendar Login Under the Microscope Event Description The museum will be open late until 6pm every Fourth Friday offering extended access to exhibits, special programming, and activities. The Los Alamos Creative District is

  9. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  10. FY 2016 Congressional Budget Request for OE

    Broader source: Energy.gov [DOE]

    FY 2016 Budget in Brief and detailed Congressional Budget Request for OE. The FY 2016 request reflects the Administration’s priority on modernizing the electric grid and boosting the resilience of infrastructure.

  11. PBL FY2001 Audited Accumulated Net Revenues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    was (386). 1. FY01 Summary In FY2001, the Pacific Northwest experienced an energy crisis as a result of the drought and the aftermath of the California deregulation. BPA was...

  12. FY 12-13 ASC Utility Filings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASC Reports FY 2012-2013 Appendix 1 Template (revised 5-19-2010) FY 2012-2013 Forecast Model (4-30-2010, 6MB) Rules of Business Procedures for BPA's ASC Review Process...

  13. Memorandum: FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off" |

    Energy Savers [EERE]

    Department of Energy FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off" Memorandum: FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off" From: Teresa Tyborowski, Acting Deputy Assistant Secretary for Program Planning & Budget (EM-60) Subject: Fiscal Years 2014 through 2018 Initial Budget Formulation "Kick-Off" The purpose of this memorandum is to "kick-off" the Office of Environmental Management's (EM) fiscal years (FY) 2014

  14. FY 2004 LDRD Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 LDRD Report FY 2004 LDRD Report The multi-program National Laboratories devoted approximately $365 million to LDRD for FY 2004. LDRD investments compared to the sources of laboratory funding indicates the LDRD benefits are commensurate with the funding received from defense, non-defense, and Department of Homeland Security (DHS) sources. PDF icon FY 2004 LDRD Report to Congress More Documents & Publications FY 2005

  15. FY 2010 Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2008 FY 2009 FY 2009 FY 2010 Current Current Current Congressional Approp. Approp. Recovery Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy.......................................... 1,704,112 2,178,540 16,800,000 2,318,602 +140,062 +6.4% Electricity delivery and energy

  16. FY 2011 Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2009 FY 2009 FY 2010 FY 2011 Current Current Current Congressional Approp. Recovery Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy........................................... 2,156,865 16,771,907 2,242,500 2,355,473 +112,973 +5.0% Electricity delivery and energy

  17. FY 2011 Statistical Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2009 FY 2009 FY 2010 FY 2011 Current Current Current Congressional Approp. Recovery Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy........................................... 2,156,865 16,771,907 2,242,500 2,355,473 +112,973 +5.0% Electricity delivery and energy

  18. FY 2013 Budget Hearing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2013 Budget Hearing FY 2013 Budget Hearing By: Secretary Steven Chu, U.S. Department of Energy Before: Subcommittee on Energy and Water Development, and Related Agencies Committee on Appropriations U.S. House of Representatives Subject: FY 2013 Budget Hearing Date: February 28, 2012 PDF icon Secretary Chu Testimony - 02/28/2012 More Documents & Publications Before the Senate Energy and Natural Resources Committee FY 2013 Budget Hearing Before House Committee on Science, Space and

  19. LDRD Call FY2013 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Document Number: NA Effective Date: 10/2014 File (public): PDF icon ldrd_call_fy2013

  20. LDRD Call FY2014 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Document Number: NA Effective Date: 10/2014 File (public): PDF icon ldrd_call_fy2014

  1. LDRD Call FY2015 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Document Number: Na Effective Date: 10/2014 File (public): PDF icon ldrd_call_fy2015

  2. FY12 Biomass Program Congressional Budget Request

    SciTech Connect (OSTI)

    none,

    2011-02-01

    FY12 budget and funding for the Biomass Program biomass and biorefinery systems research development and deployment.

  3. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-08-15

    This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  4. EERE FY 2016 Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget » EERE FY 2016 Budget Request EERE FY 2016 Budget Request EERE FY 2016 Budget Request, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. PDF icon FY 2016 Rollout EERE Stakeholder Presentation.pdf More Documents & Publications FY 2017 Budget Justification EERE FY 2017 Budget Request EERE FY 2015 Budget Request Webinar -- Energy Efficiency Blog News Mission Leadership Budget Formulation & Execution Archives

  5. EERE FY 2017 Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE FY 2017 Budget Request EERE FY 2017 Budget Request EERE FY 2017 Budget Request, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. PDF icon FY 2017 Rollout EERE Stakeholder Presentation More Documents & Publications Strategic Programs FY2017 Budget Overview EERE FY 2015 Budget Request Webinar -- Transportation Office of Energy Efficiency and Renewable Energy FY 2015 Budget Request Blog News Mission Leadership Budget

  6. FE FY 2017 BUDGET REQUEST PRESENTATION | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FE FY 2017 BUDGET REQUEST PRESENTATION FE FY 2017 BUDGET REQUEST PRESENTATION FY 2017 budget presentation for the Office of Fossil Energy, including funding requests for programs under Fossil Energy Research and Development and Petroleum Reserves. PDF icon FY17_Budget_Presentation.pdf More Documents & Publications FE FY 2016 BUDGET REQUEST PRESENTATION FE FY 2015 Budget Request Presentation Fossil Energy FY 2015 Budget in Brief

  7. FY 2009 Environmental Management Budget Request to Congress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy FY 2009 Environmental Management Budget Request to Congress FY 2009 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2009 Congressional Budget Request PDF icon Department of Energy - Environmental Management FY 2009 Congressional Budget Request More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2010 Environmental Management

  8. FY 2014 EM Budget Rollout Presentation | Department of Energy

    Energy Savers [EERE]

    EM Budget Rollout Presentation FY 2014 EM Budget Rollout Presentation FY 2014 EM Budget Rollout Presentation Office of Environmental Management David Huizenga, Senior Advisor for Environmental Management April 10, 2013 View the FY 2014 EM Budget Request to Congress PDF icon EM FY14 Budget Rollout Presentation More Documents & Publications FY 2015 EM Budget Rollout Presentation FY 2016 EM Budget Rollout Presentation FY 2017 EM Budget Rollout Presentation

  9. FY 2007 Control Table by Appropriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2005 FY 2006 FY 2007 Current Current Congressional Approp. Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and Conservation......................................... 1,801,815 1,812,627 1,923,361 +110,734 +6.1% Fossil energy programs Clean coal technology.......................................................

  10. FY 2008 Control Table by Appriopriation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2006 FY 2007 FY 2008 Current Congressional Congressional Approp. Request Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and Conservation..................................... 1,812,397 1,923,361 2,187,943 +264,582 +13.8% Fossil energy programs Clean coal technology...................................................

  11. FY 2010 Summary Table by Organization

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 FY 2009 FY 2009 FY 2010 Current Current Current Congressional Approp. Approp. Recovery Request $ % Discretionary Summary By Organization National Security Weapons........................................................................................... 6,302,366 6,380,000 -- 6,384,431 +4,431 +0.1% Defense Nuclear Nonproliferation...................................................... 1,334,922 1,482,350 -- 2,136,709 +654,359 +44.1% Naval

  12. U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  13. U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 3rd Quarter 2014 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  14. U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Destination State ___________________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 Alabama ___________________________________________________________________________________________________________________________________ Table DS-1. Domestic

  15. U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Origin State _______________________________________________________________________________________________________________________________ 1 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 U.S. Energy Information Administration | Quarterly Coal Distribution Report 4th Quarter 2014 Alabama _______________________________________________________________________________________________________________________________ Table OS-1. Domestic Coal

  16. Photovoltaic Subcontract Program, FY 1990

    SciTech Connect (OSTI)

    Summers, K.A.

    1991-03-01

    This report summarizes the progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaics Program at the Solar Energy Research Institute (SERI). The SERI subcontracted PV research and development represents most of the subcontracted R D that is funded by the US Department of Energy (DOE) National Photovoltaics Program. This report covers fiscal year (FY) 1990: October 1, 1989 through September 30, 1990. During FY 1990, the SERI PV program started to implement a new DOE subcontract initiative, entitled the Photovoltaic Manufacturing Technology (PVMaT) Project.'' Excluding (PVMaT) because it was in a start-up phase, in FY 1990 there were 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of those subcontracts were with universities, at a total funding of over $3.3 million. Cost sharing by industry added another $4.3 million to that $11.9 million of SERI PV subcontracted R D. The six technical sections of this report cover the previously ongoing areas of the subcontracted program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs discuss approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports the progress since its inception in FY 1990. Highlights of technology transfer activities are also reported.

  17. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1--March 31, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This quarterly technical progress report presents progress on several different projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Pilot Program; Plasma Furnace Projects for waste destruction; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project for removal of radioactive materials; and Spray Casting Project.

  18. ARM Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 1–September 30, 2012

    SciTech Connect (OSTI)

    Sivaraman, C

    2012-11-13

    The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive.

  19. ARM Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 01–September 30, 2011

    SciTech Connect (OSTI)

    Sivaraman, C

    2011-11-02

    The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive. New information is highlighted in blue text. New information about processed data by the developer is highlighted in red text.

  20. DOE LDRD Project List FY 2015.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ID Project Name FY Total FY2013-MAKl-0513 Demistifying the hydration layer on nano oxide in suspensions by liquid cell Transmission Electron Microscopy $2,183 FY2013-VDOB-0909 Theory and Simulation of Solid-State Nuclear Magnetic Resonance for Characterization of New Materials $116,297 FY2014-LOG-1212 Self-Healing Adaptive Structural Coatings $16,357 FY2014-LWA-0413 Adsorption-induced Shape-changing in Nano alloys: Extended Alloy Wulff Construction with First- principles Calculations $83,539

  1. Quarterly Allocation Reductions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocation Reductions Quarterly Allocation Reductions MPP (or computational) repositories that haven't used (charged) significant amounts of time are adjusted at certain times during the year by transferring a part of the unused balance to the corresponding DOE Office reserve. Allocation Year 2016 The following schedule will be used for allocation year 2016 (which runs 12 January 2016 through 9 January 2017). (NOTE: Since we have implemented the scavenger queues on the computers and with the

  2. Quarterly Progress Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2016 Quarterly Nuclear Deployment Scorecard - April 2016 News Updates On April 12 NRC held a public meeting in Oak Ridge, Tennessee to discuss Tennessee Valley Authority's (TVA) plans to submit an Early Site Permit (ESP) application to potentially site a small modular reactor at their Clinch River Site.TVA's ESP application will use a Plant Parameter Envelope approach to provide sufficient bounding parameters and characteristics of the reactors and the associated facilities so that

  3. Stockpile Stewardship Quarterly

    National Nuclear Security Administration (NNSA)

    1, Number 3 * October 2011 Message from the Assistant Deputy Administrator for Stockpile Stewardship, Chris Deeney Comments Questions or comments regarding the Stockpile Stewardship Quarterly should be directed to Terri.Batuyong@nnsa.doe.gov Technical Editor: Chris Werner, Publication Editor: Millicent Mischo Defense Programs Stockpile Stewardship in Action Volume 1, Number 3 Inside this Issue 2 Simulation: A Window into the Detonation of High Explosives 3 Modeling of High-Explosive Detonation

  4. FY 2009 E-Government Act Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E-Government Act Report FY 2009 E-Government Act Report FY 2009 E-Government Act Report PDF icon FY 2009 E-Government Act Report More Documents & Publications DOE E-Government Act Report FY 2007 Microsoft Word - DOE E-Government Act Report 11.16.06 Final.doc FY 2010 E-Government Act Report

  5. FY 2010 E-Government Act Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 E-Government Act Report FY 2010 E-Government Act Report FY 2010 E-Government Act Report PDF icon FY 2010 E-Government Act Report More Documents & Publications Microsoft Word - DOE E-Government Act Report 11.16.06 Final.doc DOE E-Government Act Report FY 2007 FY 2009 E-Government Act

  6. FY 2012 Budget Rollout Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12 Budget Rollout Overview FY 2012 Budget Rollout Overview PDF icon fy12-budget-rollout-02-14-11-final-distribution.pdf More Documents & Publications FY 2012 Budget Justification Microsoft PowerPoint - FY11 budget rollout 2-1-10 final FY 2008 Budget Justification

  7. FY 2015 EM Budget Rollout Presentation | Department of Energy

    Energy Savers [EERE]

    EM Budget Rollout Presentation FY 2015 EM Budget Rollout Presentation FY 2015 EM Budget Rollout Presentation Office of Environmental Management David Huizenga, Senior Advisor for Environmental Management March 4, 2014 PDF icon EM FY15 Budget Rollout Presentation More Documents & Publications FY 2016 EM Budget Rollout Presentation FY 2017 EM Budget Rollout Presentation 2014 Congressional Nuclear Cleanup Caucus Briefings

  8. FY09 Property Balanced Score Card Fed | Department of Energy

    Energy Savers [EERE]

    Property Balanced Score Card Fed FY09 Property Balanced Score Card Fed PDF icon Microsoft Word - FY09PropertyBSCFed.doc More Documents & Publications Microsoft Word - FY09PropertyBSCContractor.doc Microsoft Word - FY10PropertyBSCFed.doc Microsoft Word - FY10PropertyBSCContractor.doc

  9. BTO FY17-FY19 National Laboratory Call & Merit Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 7-FY19 National Laboratory Call & Merit Review BTO FY17-FY19 National Laboratory Call & Merit Review February 9, 2016 - 1:37pm Addthis The Department of Energy's Building Technologies Office (BTO) is seeking multi-year (3+ years) project proposals from national laboratories ("Labs") for activities to incorporate into the FY 2017, FY 2018, and FY 2019 Annual Operating Plans (AOPs). Only proposals for which a DOE national laboratory is the prime recipient will be

  10. DOE Premium Class Travel Report for FY 09 through FY 13 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Premium Class Travel Report for FY 09 through FY 13 DOE Premium Class Travel Report for FY 09 through FY 13 This report was provided to the FOIA office in response to several FOIA requests. PDF icon DOEPremiumClassTravelReportsFY09-FY13.pdf More Documents & Publications ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule Development and Demonstration of a Fuel-Efficient Class 8 Highway Vehicle

  11. SRS Employee Headcount by County of Residence Q3 FY15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 rd Quarter FY 2015 *Data does not include MOX, Parsons and some small subcontractors SRS Employee Headcount by County of Residence Q3 FY15 GA County SRNS SRR Centerra Ameresco DOE-SR County Total Burke 34 3 4 0 0 41 Columbia 777 260 100 6 42 1185 Jefferson 2 2 0 0 0 4 Lincoln 8 1 2 0 0 11 McDuffie 8 6 0 0 2 16 Richmond 548 160 102 4 29 843 Screven 23 6 1 0 0 30 Other 35 8 3 0 0 46 GA TOTAL 1435 446 212 10 73 2176 SC County SRNS SRR Centerra Ameresco DOE-SR County Total Aiken 2613 852 353 9 158

  12. SRS Employee Headcount by County of Residence Q4 FY15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 th Quarter FY 2015 *Data does not include MOX, Parsons and some small subcontractors SRS Employee Headcount by County of Residence Q4 FY15 GA County SRNS SRR Centerra Ameresco DOE-SR County Total Burke 33 3 4 0 0 40 Columbia 776 253 102 6 45 1182 Jefferson 2 2 0 0 0 4 Lincoln 8 1 2 0 0 11 McDuffie 8 5 0 0 2 15 Richmond 546 160 99 4 29 838 Screven 23 5 1 0 0 29 Other 33 7 3 0 1 44 GA TOTAL 1429 436 211 10 77 2163 SC County SRNS SRR Centerra Ameresco DOE-SR County Total Aiken 2619 855 348 9 167

  13. SRS Employee Headcount by County of Residence Q2, FY 15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 nd Quarter, FY 2015 *Data does not include MOX, Parsons and some small subcontractors SRS Employee Headcount by County of Residence Q2, FY 15 GA County SRNS SRR Centerra Ameresco DOE-SR County Total Burke 34 3 4 0 0 41 Columbia 769 249 102 7 45 1172 Jefferson 2 2 0 0 0 4 Lincoln 9 1 2 0 0 12 McDuffie 9 6 0 0 2 17 Richmond 558 146 103 3 29 839 Screven 23 6 1 0 0 30 Other 36 1 3 0 0 40 GA TOTAL 1440 414 215 10 76 2155 SC County SRNS SRR Centerra Ameresco DOE-SR County Total Aiken 2597 829 360 9

  14. Fourth Friday Cancelled due to Thanksgiving Holidays

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fourth Chapter of Hanford Story Released to Public Fourth Chapter of Hanford Story Released to Public February 15, 2012 - 12:00pm Addthis Carrie Meyer, DOE, (509) 372-0810 RICHLAND, Wash. - The Department of Energy is releasing the fourth chapter of The Hanford Story today to the public. "Tank Waste Cleanup" focuses on the work conducted by the Office of River Protection to retrieve, treat and ultimately dispose of the 56 million gallons of Hanford's tank waste. The video describes the

  15. 2014 Second Quarter Financial Review

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    from operations outpaced capital expenditure in recent quarters, the energy companies' free cash flow increased 12 annualized free cash flow billion 2014 Source: U.S. Energy...

  16. FY 2014 Budget Request Laboratory Table | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Table FY 2014 Budget Request Laboratory Table PDF icon Lab Table FY2014.pdf More Documents & Publications FY 2014 Budget Request State Table Fiscal Year 2013 President's Budget Request Fiscal Year 2013 President's

  17. FOSSIL ENERGY FY 2016 BUDGET | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FOSSIL ENERGY FY 2016 BUDGET FOSSIL ENERGY FY 2016 BUDGET Documents and information related to the Fossil Energy FY 2016 budget. Office of Fossil Energy Techline Office of Fossil Energy Budget Request Presentation

  18. FY 2007 Congressional Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget Request FY 2007 Congressional Budget Request Laboratory Tables for the Department of Energy's 2007 Congressional budget. PDF icon FY 2007 Congressional Budget Request More Documents & Publications FY 2007 Congressional

  19. FY 2014 Excess Elimination Report FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Excess Elimination Report FINAL FY 2014 Excess Elimination Report FINAL PDF icon FY 2014 Excess Elimination Report FINAL.PDF More Documents & Publications FY 2013 Excess Elimination Report UCOR Contract & Fee Determination EA-1451: Final Environmental Assessment

  20. FY 2016 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon FY 2016 SES and SP Performance Cycle Memo to Heads of Departmental Elements PDF icon FY 2016 SES Performance Appraisal System - Opening Guidance PDF icon FY 2016 SP ...

  1. FY 2015 Senior Executive Service (SES) and Senior Professional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon FY 2015 SES and SP Performance Appraisal Cycle Memo to Heads of Departmental PDF icon FY 2015 SES Performance Appraisal System - Opening Guidance PDF icon FY 2015 SP ...

  2. Sandia Energy - CSP Mid-Year FY12 AOP Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CSP Mid-Year FY12 AOP Review Home Renewable Energy Energy News Concentrating Solar Power Solar CSP Mid-Year FY12 AOP Review Previous Next CSP Mid-Year FY12 AOP Review Sandia held...

  3. FY 2013 Excess Elimination Report | Department of Energy

    Energy Savers [EERE]

    Excess Elimination Report FY 2013 Excess Elimination Report PDF icon Signed_FY2013_Excess_Elimination_Rpt.pdf More Documents & Publications FY 2014 Excess Elimination Report FINAL UCOR Contract & Fee Determination EA-1451: Final Environmental Assessment

  4. FE FY 2016 BUDGET REQUEST PRESENTATION | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    6budgetrollout 2-2-15.pdf More Documents & Publications FE FY 2015 Budget Request Presentation Fossil Energy FY 2013 Budget-in-Brief Fossil Energy FY 2015 Budget in Brief...

  5. LDRD FY 2014 Program Plan

    SciTech Connect (OSTI)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  6. Quarterly Nuclear Deployment Scorecard - October 2015 | Department...

    Energy Savers [EERE]

    Quarterly Nuclear Deployment Scorecard - October 2015 Quarterly Nuclear Deployment Scorecard - October 2015 News Updates The Nuclear Regulatory Commission has issued an operating...

  7. QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 News Updates Dominion Resources, Inc. has informed the NRC that Dominion ...

  8. Molecular catalytic coal liquid conversion. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    October--December 1994 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly report, October--December 1994 In this Quarter, the...

  9. Molecular catalytic coal liquid conversion. Quarterly report...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly report In this Quarter, the research was focused continually on the two...

  10. NRC TLD Direct Radiation Monitoring Network. Volume 15, No. 4: Quarterly progress report, October--December 1995

    SciTech Connect (OSTI)

    Struckmeyer, R.

    1996-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1995. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

  11. Strategic Programs FY2017 Budget Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Programs FY2017 Budget Overview Strategic Programs FY2017 Budget Overview Office of Energy Efficiency and Renewable Energy Office of Strategic Programs FY2017 Budget Overview webinar slides, as presented by John Lushetsky, Office of Strategic Programs, March 31, 2016. PDF icon Budget overview webinar slides More Documents & Publications EERE FY 2017 Budget Request FY 2017 Budget Justification EERE FY 2016 Budget Overview -- Sustainable Transportation

  12. FY 2015 | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statistical Table by Appropriation (dollars in thousands - OMB Scoring) Statistical Table by Appropriation Page 1 FY 2015 Congressional Request FY 2013 FY 2014 FY 2014 FY 2014 FY 2015 Current Enacted Adjustment Current Congressional Approp. Approp. Approp. Request Discretionary Summary By Appropriation Energy And Water Development And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy............................... 1,691,757 1,900,641 ---- 1,900,641

  13. Office Inspector General DOE Annual Performance Report FY 2008, Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan FY 2009 | Department of Energy Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY 2009 Office Inspector General DOE Annual Performance Report FY 2008, Annual Performance Plan FY 2009 During Fiscal Year (FY) 2008, we reviewed a variety of critical areas relevant to the Department's mission priorities. One of our goals, for example, was to examine possible programmatic improvements in Department operations relating to cyber security and

  14. FY 2014 Q3 Metric Summary | Department of Energy

    Energy Savers [EERE]

    4 Q3 Metric Summary FY 2014 Q3 Metric Summary FY 2014 Q3 Metric Summary PDF icon FY 2014 Q3 Metric Summary.pdf More Documents & Publications FY 2014 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2015 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2016 Overall Contract and Project Management Improvement Performance Metrics and Targets

  15. Hanford Speakers Bureau Presentations FY2015 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bureau Hanford Speakers Bureau Presentations FY2015 Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers Bureau Presentations FY2015 Hanford Speakers Bureau Presentations FY2014 Hanford Speakers Bureau Presentations FY2013 Hanford Site Tours Hanford Speakers Bureau Presentations FY2015 Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size FY 2015 Presentations Milton Freewater

  16. Assistant Secretary Rispoli's FY 2009 EM Budget Rollout Presentation |

    Energy Savers [EERE]

    Department of Energy Rispoli's FY 2009 EM Budget Rollout Presentation Assistant Secretary Rispoli's FY 2009 EM Budget Rollout Presentation Assistant Secretary Rispoli's FY 2009 EM Budget Rollout Presentation PDF icon Assistant Secretary Rispoli's FY 2009 EM Budget Rollout Presentation More Documents & Publications Assistant Secretary Triay's FY 2011 EM Budget Rollout Presentation FY 2010 Environmental Management Budget Request to Congress 2013 Congressional Nuclear Cleanup Caucus

  17. Assistant Secretary Triay's FY 2011 EM Budget Rollout Presentation |

    Energy Savers [EERE]

    Department of Energy 1 EM Budget Rollout Presentation Assistant Secretary Triay's FY 2011 EM Budget Rollout Presentation Office of Environmental Management FY 2011 Budget Request PDF icon Office of Environmental Management FY 2011 Budget Request More Documents & Publications FY 2011 Environmental Management Budget Request to Congress Assistant Secretary Rispoli's FY 2009 EM Budget Rollout Presentation FY 2013 Environmental Management Budget Request to Congress

  18. NS&T Managment Observations - 1st Quarter

    SciTech Connect (OSTI)

    David Gianotto

    2014-06-01

    The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements expectations as they relate to safety, security, quality, and work performance. Management observations (observations) are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of managements observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&Ts MOP.

  19. NS&T Management Observations - 3rd Quarter

    SciTech Connect (OSTI)

    David Gianotto

    2014-07-01

    The INL Management Observation Program (MOP) is designed to improve managers and supervisors understanding of work being performed by employees and the barriers impacting their success. The MOP also increases workers understanding of managements expectations as they relate to safety, security, quality, and work performance. Management observations are designed to improve the relationship and trust between employees and managers through increased engagement and interactions between managers and researchers in the field. As part of continuous improvement, NS&T management took initiative to focus on the participation and quality of observations in FY 14. This quarterly report is intended to (a) summarize the participation and quality of managements observations, (b) assess observations for commonalities or trends related to facility or process barriers impacting research, and (c) provide feedback and make recommendations for improvements NS&Ts MOP.

  20. SPEAR 3 Quarterly Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management