National Library of Energy BETA

Sample records for fort st vrain

  1. DOE - Office of Legacy Management -- Fort St Vrain - 011

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... Vrains spent nuclear fuel. Originally, Fort St. Vrain was a nuclear power generating ...

  2. DOE - Office of Legacy Management -- Fort St Vrain - 011

    Office of Legacy Management (LM)

    Fort St Vrain - 011 FUSRAP Considered Sites Site: Fort St Vrain (011) DOE Office of Environmental Management assumed the radioactive materials license for storage of spent nuclear fuel in 1999. Designated Name: Not Designated under FUSRAP Alternate Name: Fort St Vrain Independent Spent Fuel Storage Installation (ISFSI) Location: Platteville, Colorado Evaluation Year: Not considered for FUSRAP - in another program Site Operations: Nuclear power plant Site Disposition: Decommissioned in 1989 with

  3. Conceptual design report for the mechanical disassembly of Fort St. Vrain fuel elements

    SciTech Connect (OSTI)

    Lord, D.L.; Wadsworth, D.C.; Sekot, J.P.; Skinner, K.L.

    1993-04-01

    A conceptual design study was prepared that: (1) reviewed the operations necessary to perform the mechanical disassembly of Fort St. Vrain fuel elements; (2) contained a description and survey of equipment capable of performing the necessary functions; and (3) performed a tradeoff study for determining the preferred concepts and equipment specifications. A preferred system was recommended and engineering specifications for this system were developed.

  4. Nondestructive examination of 51 fuel and reflector elements from Fort St. Vrain Core Segment 1

    SciTech Connect (OSTI)

    Miller, C.M.; Saurwein, J.J.

    1980-12-01

    Fifty-one fuel and reflector elements irradiated in core segment 1 of the Fort St. Vrain High-Temperature Gas-Cooled Reactor (HTGR) were inspected dimensionally and visually in the Hot Service Facility at Fort St. Vrain in July 1979. Time- and volume-averaged graphite temperatures for the examined fuel elements ranged from approx. 400/sup 0/ to 750/sup 0/C. Fast neutron fluences varied from approx. 0.3 x 10/sup 25/ n/m/sup 2/ to 1.0 x 10/sup 25/ n/m/sup 2/ (E > 29 fJ)/sub HTGR/. Nearly all of the examined elements shrank in both axial and radial dimensions. The measured data were compared with strain and bow predictions obtained from SURVEY/STRESS, a computer code that employs viscoelastic beam theory to calculate stresses and deformations in HTGR fuel elements.

  5. Equipment for nondestructive evaluation of the strength of the Fort St. Vrain core-support blocks

    SciTech Connect (OSTI)

    Morgan, W.C.; Prince, J.M.; Posakony, G.J.

    1982-09-01

    A novel sweep-frequency eddy current instrument has been constructed for measuring density-depth profiles in oxidized graphite. Development work on additional parts of the instrumentation package, that was to be tested in the Fort St. Vrain High Temperature Gas-Cooled Reactor, has been temporarily halted. This report documents the work which has been accomplished to date and presents the current status of the equipment development effort.

  6. Thermal-stress analysis of a Fort St. Vrain core-support block under accident conditions

    SciTech Connect (OSTI)

    Carruthers, L.M.; Butler, T.A.; Anderson, C.A.

    1982-01-01

    A thermoelastic stress analysis of a graphite core support block in the Fort St. Vrain High Temperature Gas Cooled Reactor is described. The support block is subjected to thermal stresses caused by a loss of forced circulation accident of the reactor system. Two- and three-dimensional finite element models of the core support block are analyzed using the ADINAT and ADINA codes, and results are given that verify the integrity of this structural component under the given accident condition.

  7. Remote examination of Fort St. Vrain HTGR fuel and reflector elements

    SciTech Connect (OSTI)

    McCord, F.; Saurwein, J.J.

    1984-01-01

    A robotic device developed at GA Technologies was used to perform remote metrological and visual examinations on 105 irradiated fuel and reflector elements removed from the High Temperature Gas Cooled Reactor (HTGR) core of the Fort St. Vrain (FSV) Nuclear Generating Station. All examinations were accomplished in a fraction of the time and at a fraction of the cost for manual methods. Theses examinations have been useful in the verification of core design codes, in monitoring the in-pile performance of graphite blocks, and in qualifying improved core materials.

  8. Three-dimensional thermoelastic analysis of a Fort St. Vrain core support block

    SciTech Connect (OSTI)

    Butler, T.A.; Anderson, C.A.

    1981-09-01

    A thermoelastic stress analysis of a graphite core support block in the Fort St. Vrain High-Temperature Gas-Cooled Reactor is described. The support block is subjected to thermal stresses caused by a loss of forced circulation accident of the reactor system. Two- and three-dimensional finite element models of the core support block are analyzed using the ADINAT and ADINA codes, and results are given that verify the integrity of this structural component under the given accident condition. 10 refs., 39 figs.

  9. Dynamic model verification studies for the thermal response of the Fort St. Vrain HTGR Core

    SciTech Connect (OSTI)

    Ball, S J

    1980-01-01

    The safety research program for high-temperature gas-cooled reactors at ORNL is directed primarily at addressing licensing questions on the Fort St. Vrain reactor near Denver, CO. An important part of the program is to make use of experimental data from the reactor to at least partially verify the dynamic simulations that are used to predict the effects of postulated accident sequences. Comparisons were made of predictions with data from four different reactor scram (trip) events from operating power levels between 30 and 50%. An optimization program was used to rationalize the differences between predictions and measurements, and, in general, excellent agreement can be obtained by adjustment of models and parameters within their uncertainty ranges. Although the optimized models are not necessarily unique, results of the study have identified areas in which some of the models were deficient.

  10. Nondestructive examination of 54 fuel and reflector elements from Fort St. Vrain core segment 2

    SciTech Connect (OSTI)

    Saurwein, J.J.

    1982-10-01

    Fifty-four fuel and reflector elements irradiated in core segment 2 of the Fort St. Vrain high-temperature gas-cooled reactor (HTGR) were nondestructively examined. The time- and volume-averaged graphite irradiation temperatures for the elements ranged from approx. 350/sup 0/ to 750/sup 0/C. The element-averaged fast neutron fluences ranged from approx. 0.2 to 1.6 x 10/sup 25/ n/m/sup 2/ (E > 29 fJ)/sub HTGR/. The elements, except for two fuel elements in which single localizeed cracks developed during irradiation, were in excellent condition. No evidence was observed of significant graphite oxidation or mechanical interaction beween elements. The cracks in the two elements did not affect their performance or handling. These elements were, otherwise, in excellent condition. Nearly all elements shrank in both the axial and radial directions, but the dimensional changes were relatively small.

  11. Characterization plan for Fort St. Vrain and Peach Bottom graphite fuels

    SciTech Connect (OSTI)

    Maarschman, S.C.; Berting, F.M.; Clemmer, R.G.; Gilbert, E.R.; Guenther, R.J.; Morgan, W.C.; Sliva, P.

    1993-09-01

    Part of Fort St. Vrain (FSV) and most of the Peach Bottom (PB) reactor spent fuels are currently stored at INEL and may remain in storage for many years before disposal. Three disposal pathways have been proposed: intact disposal, fuels partially disassembled and the high-level waste fraction conditioned prior to disposal, and fuels completed disassembled and conditioned prior to disposal. Many options exist within each of these pathways. PNL evaluated the literature and other reference to develop a fuels characterization plan for these fuels. This plan provides guidance for the characteristics of the fuel which will be needed to pursue any of the storage or disposal pathways. It also provides a suggested fuels monitoring program for the current storage facilities. This report recommends a minimum of 7 fuel elements be characterized: PB Core 1 fuel: one Type II nonfailed element, one Type II failed element, and one Type III nonfailed element; PB Core 2 fuel: two Type II nonfailed fuel elements; and FSV fuel: at least two fuel blocks from regions of high temperature and fluence and long in-reactor performance (preferably at reactor end-of- life). Selection of PB fuel elements should focus on these between radial core position 8 and 14 and on compacts between compact numbers 10 and 20. Selection of FSV fuel elements should focus on these from Fuel Zones II and III, located in Core Layers 6, 7, and possibly 8.

  12. Conceptual design report for handling Fort St. Vrain fuel element components

    SciTech Connect (OSTI)

    Gavalya, R.A.

    1993-09-01

    This report presents conceptual designs for containment of high-level wastes (HLW) and low-level wastes (LLW) that will result from disassembly of fuel elements from the High Temperature Gas-Cooled Reactor at the Fort St. Vrain nuclear power plant in Platteville, Colorado. Hexagonal fuel elements will enter the disassembly area as a HLW and exit as either as HLW or LLW. The HLW will consist of spent fuel compacts that have been removed from the hexagonal graphite block. Graphite dust and graphite particles produced during the disassembly process will also be routed to the container that will hold the HLW spent fuel compacts. The LLW will consist of the emptied graphite block. Three alternatives have been introduced for interim storage of the HLW containers after the spent fuel has been loaded. The three alternatives are: (a) store containers where fuel elements are currently being stored, (b) construct a new dry storage facility, and (c) employ Multi-Purpose Canisters (currently in conceptual design stage). Containment of the LLW graphite block will depend on several factors: (a) LLW classification, (b) radiation levels, and (c) volume-reducing technique (if used). Packaging may range from cardboard boxes for incinerable wastes to 55-ton cask inserts for remote-handled wastes. Before final designs for the containment of the HLW and LLW can be developed, several issues need to be addressed: (a) packing factor for fuel compacts in HLW container, (b) storage/disposal of loaded HLW containers, (c) characterization of the emptied graphite blocks, and (d) which technique for volume-reduction purposes (if any) will be used.

  13. Radiochemical analysis of the first plateout probe from the Fort St. Vrain high-temperature gas-cooled reactor

    SciTech Connect (OSTI)

    Burnette, R.D.

    1982-06-01

    This report presents the analysis of radioactive elements on the first plateout probe from the Fort St. Vrain high-temperature gas-cooled reactor. The plateout probe is a device which samples the primary coolant for condensible fission products. Circuit inventories of individual radionuclides are estimated from the probe analysis. The analysis shows that the radioactive contamination in the primary circuit is remarkable low, with activation product concentrations much greater than that of fission products. The analysis demonstrates that the concentrations of the key fission products I-131 and Sr-90 are far below the limits allowed by the technical specification.

  14. Preliminary plan for the qualification of the LEU/Th fuel cycle for the Fort St. Vrain HTGR

    SciTech Connect (OSTI)

    Gulden, T.D.; Gainey, B.W.; Altschwager, C.J.

    1980-03-01

    This plan was prepared to ensure that low-enriched uranium/thorium (LEU/Th) would be available as a backup to the highly enriched uranium/thorium (HEU/Th) fuel cycle currently being used in the Fort St. Vrain (FSV) high-temperature gas-cooled reactor (HTGR) in the event that the US nonproliferation policies require it. It describes the program that would be required to develop, qualify, and introduce an LEU/Th fuel cycle into the FSV HTGR on the earliest possible and most optimistic schedule. The results of the study indicate that licensing of the LEU/Th fuel cycle for FSV could be completed and fuel manufacturing could begin about 4.5 years from inception of the program.

  15. Technical and regulatory review of the Rover nuclear fuel process for use on Fort St. Vrain fuel

    SciTech Connect (OSTI)

    Hertzler, T.

    1993-02-01

    This report describes the results of an analysis for processing and final disposal of Fort St. Vrain (FSV) irradiated fuel in Rover-type equipment or technologies. This analysis includes an evaluation of the current Rover equipment status and the applicability of this technology in processing FSV fuel. The analyses are based on the physical characteristics of the FSV fuel and processing capabilities of the Rover equipment. Alternate FSV fuel disposal options are also considered including fuel-rod removal from the block, disposal of the empty block, or disposal of the entire fuel-containing block. The results of these analyses document that the current Rover hardware is not operable for any purpose, and any effort to restart this hardware will require extensive modifications and re-evaluation. However, various aspects of the Rover technology, such as the successful fluid-bed burner design, can be applied with modification to FSV fuel processing. The current regulatory climate and technical knowledge are not adequately defined to allow a complete analysis and conclusion with respect to the disposal of intact fuel blocks with or without the fuel rods removed. The primary unknowns include the various aspects of fuel-rod removal from the block, concentration of radionuclides remaining in the graphite block after rod removal, and acceptability of carbon in the form of graphite in a high level waste repository.

  16. Characteristics of potential repository wastes: Volume 4, Appendix 4A, Nuclear reactors at educational institutions of the United States; Appendix 4B, Data sheets for nuclear reactors at educational institutions; Appendix 4C, Supplemental data for Fort St. Vrain spent fuel; Appendix 4D, Supplemental data for Peach Bottom 1 spent fuel; Appendix 4E, Supplemental data for Fast Flux Test Facility

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    Volume 4 contains the following appendices: nuclear reactors at educational institutions in the United States; data sheets for nuclear reactors at educational institutions in the United States(operational reactors and shut-down reactors); supplemental data for Fort St. Vrain spent fuel; supplemental data for Peach Bottom 1 spent fuel; and supplemental data for Fast Flux Test Facility.

  17. Creation of a Full-Core HTR Benchmark with the Fort St. Vrain Initial Core and Assessment of Uncertainties in the FSV Fuel Composition and Geometry

    SciTech Connect (OSTI)

    Martin, William R.; Lee, John C.; baxter, Alan; Wemple, Chuck

    2012-03-31

    Information and measured data from the intial Fort St. Vrain (FSV) high temperature gas reactor core is used to develop a benchmark configuration to validate computational methods for analysis of a full-core, commercial HTR configuration. Large uncertainties in the geometry and composition data for the FSV fuel and core are identified, including: (1) the relative numbers of fuel particles for the four particle types, (2) the distribution of fuel kernel diameters for the four particle types, (3) the Th:U ratio in the initial FSV core, (4) and the buffer thickness for the fissile and fertile particles. Sensitivity studies were performed to assess each of these uncertainties. A number of methods were developed to assist in these studies, including: (1) the automation of MCNP5 input files for FSV using Python scripts, (2) a simple method to verify isotopic loadings in MCNP5 input files, (3) an automated procedure to conduct a coupled MCNP5-RELAP5 analysis for a full-core FSV configuration with thermal-hydraulic feedback, and (4) a methodology for sampling kernel diameters from arbitrary power law and Gaussian PDFs that preserved fuel loading and packing factor constraints. A reference FSV fuel configuration was developed based on having a single diameter kernel for each of the four particle types, preserving known uranium and thorium loadings and packing factor (58%). Three fuel models were developed, based on representing the fuel as a mixture of kernels with two diameters, four diameters, or a continuous range of diameters. The fuel particles were put into a fuel compact using either a lattice-bsed approach or a stochastic packing methodology from RPI, and simulated with MCNP5. The results of the sensitivity studies indicated that the uncertainties in the relative numbers and sizes of fissile and fertile kernels were not important nor were the distributions of kernel diameters within their diameter ranges. The uncertainty in the Th:U ratio in the intial FSV core was

  18. Thermal Evaluation of the Fort Saint Vrain Codisposal Waste Package

    SciTech Connect (OSTI)

    Adam Scheider; Horia Radulescu

    2001-07-19

    The objective of this calculation is to evaluate the thermal response of the Fort Saint Vrain (FSV) Codisposal Waste Package (WP) design under nominal Monitored Geologic Repository conditions. The objective of the calculation is to provide thermal parameter information to support the FSV waste package design. The information provided by the sketches (Attachment IV) is that of the potential design of the type of WP considered in this calculation, and all obtained results are valid for that design only. This calculation is associated with the WP design and was performed by the Waste Package Design group in accordance with the ''Technical Work Plan for: Waste Package Design Description for LA'' (Ref. 16). AP-3.124, ''Calculations'' (Ref. 17) is used to perform the calculation and develop the document. The sketches attached to this calculation provide the potential dimensions and materials for the SDHLW (Defense High Level Waste) / DOE (Department of Energy) Long WP.

  19. Fort Saint Vrain HTGR (Th/U carbide) Fuel Characteristics for Disposal Criticality Analysis

    SciTech Connect (OSTI)

    Taylor, Larry Lorin

    2001-01-01

    DOE-owned spent nuclear fuels encompass many fuel types. In an effort to facilitate criticality analysis for these various fuel types, they were categorized into eight characteristic fuel groups with emphasis on fuel matrix composition. Out of each fuel group, a representative fuel type was chosen for analysis as a bounding case within that fuel group. Generally, burnup data, fissile enrichments and total fuel mass govern the selection of the representative or candidate fuel within that group. For the HTGR group, the Fort Saint Vrain (FSV) reactor fuel has been chosen for the evaluation of viability for waste co-disposal. The FSV reactor was operated by Public Service of Colorado as a licensed power reactor. The FSV fuel employs a U/Th carbide matrix in individually pyrolytic carbon-coated particles. These individual particles are in turn coated with silicon carbide (SiC) and contained within fuel compacts, that are in turn embedded in graphite blocks that comprised the structural core of the reactor.

  20. Evaluation of Codisposal Viability for TH/U Carbide (Fort Saint Vrain HTGR) DOE-Owned Fuel

    SciTech Connect (OSTI)

    H. radulescu

    2001-09-28

    There are more than 250 forms of US Department of Energy (DOE)-owned spent nuclear fuel (SNF). Due to the variety of the spent nuclear fuel, the National Spent Nuclear Fuel Program has designated nine representative fuel groups for disposal criticality analyses based on fuel matrix, primary fissile isotope, and enrichment. The Fort Saint Vrain reactor (FSVR) SNF has been designated as the representative fuel for the Th/U carbide fuel group. The FSVR SNF consists of small particles (spheres of the order of 0.5-mm diameter) of thorium carbide or thorium and high-enriched uranium carbide mixture, coated with multiple, thin layers of pyrolytic carbon and silicon carbide, which serve as miniature pressure vessels to contain fission products and the U/Th carbide matrix. The coated particles are bound in a carbonized matrix, which forms fuel rods or ''compacts'' that are loaded into large hexagonal graphite prisms. The graphite prisms (or blocks) are the physical forms that are handled in reactor loading and unloading operations, and which will be loaded into the DOE standardized SNF canisters. The results of the analyses performed will be used to develop waste acceptance criteria. The items that are important to criticality control are identified based on the analysis needs and result sensitivities. Prior to acceptance to fuel from the Th/U carbide fuel group for disposal, the important items for the fuel types that are being considered for disposal under the Th/U carbide fuel group must be demonstrated to satisfy the conditions determined in this report.

  1. Fort Bragg

    SciTech Connect (OSTI)

    2009-11-01

    This is a combined heat and power (CHP) project profile on a 5 MW combustion turbine at Fort Bragg in North Carolina.

  2. ST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ST Meeting of the Joint Working Group on Safety for the U.S.-PRC Coordinating Committee of Fusion Energy (U.S.-PRC Safety Monitoring Program) Meeting in China, December 9-14, 2009 Respectfully submitted on April 12, 2010 to: Barry Sullivan U.S. DOE - Office of Fusion Energy Sciences Professor Yican Wu, Deputy Director Academy of Science Institute for Plasma Physics Professor Yong Liu, Director Southwestern Institute of Physics - Center for Fusion Science Prepared by: Lee Cadwallader, Rick

  3. Fort Carson Photovoltaic System

    Broader source: Energy.gov [DOE]

    This photograph features the 2-megawatt photovotaic (PV) system that was installed at the U.S. Army Fort Carson base. The system was financed through a power purchase agreement (PPA) and developed...

  4. Cove Fort Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Cove Fort Geothermal Area (Redirected from Cove Fort Geothermal Area - Vapor) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Cove Fort Geothermal Area Contents 1 Area...

  5. Fort Collins CO 80525

    Office of Legacy Management (LM)

    3801 Automation Way Suite 100 Fort Collins CO 80525 Tel 970.223.9600 Fax 970.223.7171 www.tetratech.com Technical Memorandum To: Ms. Linda Kaiser From: Thomas A. Chapel, CPG, PE Company: S. M. Stoller Corporation Date: March 21, 2014 Re: Instrumentation and Monitoring, Rocky Flats OLF Tt Project #: 114-181750 Introduction This technical memorandum provides a summary and evaluation of data collected from inclinometer and piezometer instrumentation at the Rocky Flats Original Landfill (OLF)

  6. Cove Fort Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Cove Fort Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Cove Fort Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory...

  7. Water resource opportunity assessment: Fort Dix

    SciTech Connect (OSTI)

    Sullivan, G.P.; Hostick, D.J.; Elliott, D.B.; Fitzpatrick, Q.K.; Dahowski, R.T.; Dison, D.R

    1996-12-01

    This report provides the results of the water resource opportunity assessments performed by Pacific Northwest National Laboratory at the Fort Dix facility located in Fort Dix, New Jersey.

  8. Fort Polk EEAP. Final report

    SciTech Connect (OSTI)

    Busch, R.D.; Scheuch, K.E.; Shishman, T.T.

    1986-07-17

    This Final Presentation provides a summary of the work done under Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk Louisiana. The work was accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The vast majority of consumed energy at Fort Polk consists of electricity and natural gas. In FY75, Fort Polk used 48,399,000 kWh of electricity at a cost of $600,000. During that same period, 782,637 MCF of natural gas was purchased for $484,000. The total FY75 energy use was 1,368,327 MBtu.

  9. Fort Carson Wind Resource Assessment

    SciTech Connect (OSTI)

    Robichaud, R.

    2012-10-01

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  10. Boralex Fort Fairfield Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Fort Fairfield Biomass Facility Jump to: navigation, search Name Boralex Fort Fairfield Biomass Facility Facility Boralex Fort Fairfield Sector Biomass Location Aroostook County,...

  11. Fort Collins, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Program (Colorado) Fort Collins Utilities - Residential and Small Commercial Appliance Rebate Program (Colorado) Utility Companies in Fort Collins, Colorado City of Fort...

  12. Fort Belknap Indian Community - Wind Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The new fort served as a trading post and Chinook, Montana. The new fort served as a trading post and became the government agency for the became the government agency for the Gros ...

  13. Fort Belknap Indian Community Wind Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fort Belknap was established in 1869 near the present town of Chinook, Montana. The new fort served as a trading post and became the government agency for the Gros Ventre and ...

  14. Fort Belknap Indian Community - Wind Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fort Belknap was established in 1869 near the present town of Chinook, Montana. The new fort served as a trading post and became the government agency for the Gros Ventre and ...

  15. FORT UNION DEEP

    SciTech Connect (OSTI)

    Lyle A. Johnson Jr.

    2002-03-01

    Coalbed methane (CBM) is currently the hottest area of energy development in the Rocky Mountain area. The Powder River Basin (PRB) is the largest CBM area in Wyoming and has attracted the majority of the attention because of its high permeability and relatively shallow depth. Other Wyoming coal regions are also being targeted for development, but most of these areas have lower permeability and deeper coal seams. This project consists of the development of a CBM stimulation system for deep coal resources and involves three work areas: (1) Well Placement, (2) Well Stimulation, and (3) Production Monitoring and Evaluation. The focus of this project is the Washakie Basin. Timberline Energy, Inc., the cosponsor, has a project area in southern Carbon County, Wyoming, and northern Moffat County, Colorado. The target coal is found near the top of the lower Fort Union formation. The well for this project, Evans No.1, was drilled to a depth of 2,700 ft. Three coal seams were encountered with sandstone and some interbedded shale between seams. Well logs indicated that the coal seams and the sandstone contained gas. For the testing, the upper seam at 2,000 ft was selected. The well, drilled and completed for this project, produced very little water and only occasional burps of methane. To enhance the well, a mild severity fracture was conducted to fracture the coal seam and not the adjacent sandstone. Fracturing data indicated a fracture half-length of 34 ft, a coal permeability of 0.2226 md, and permeability of 15.3 md. Following fracturing, the gas production rate stabilized at 10 Mscf/day within water production of 18 bpd. The Western Research Institute (WRI) CBM model was used to design a 14-day stimulation cycle followed by a 30-day production period. A maximum injection pressure of 1,200 psig to remain well below the fracture pressure was selected. Model predictions were 20 Mscf/day of air injection for 14 days, a one-day shut-in, then flowback. The predicted flowback

  16. FORT UNION DEEP

    SciTech Connect (OSTI)

    Lyle A. Johnson Jr.

    2002-09-01

    Coalbed methane (CBM) is currently the hottest area of energy development in the Rocky Mountain area. The Powder River Basin (PRB) is the largest CBM area in Wyoming and has attracted the majority of the attention because of its high permeability and relatively shallow depth. Other Wyoming coal regions are also being targeted for development, but most of these areas have lower permeability and deeper coal seams. This project consists of the development of a CBM stimulation system for deep coal resources and involves three work areas: (1) Well Placement, (2) Well Stimulation, and (3) Production Monitoring and Evaluation. The focus of this project is the Washakie Basin. Timberline Energy, Inc., the cosponsor, has a project area in southern Carbon County, Wyoming, and northern Moffat County, Colorado. The target coal is found near the top of the lower Fort Union formation. The well for this project, Evans No.1, was drilled to a depth of 2,700 ft. Three coal seams were encountered with sandstone and some interbedded shale between seams. Well logs indicated that the coal seams and the sandstone contained gas. For the testing, the upper seam at 2,000 ft was selected. The well, drilled and completed for this project, produced very little water and only occasional burps of methane. To enhance the well, a mild severity fracture was conducted to fracture the coal seam and not the adjacent sandstone. Fracturing data indicated a fracture half-length of 34 ft, a coal permeability of 0.2226 md, and permeability of 15.3 md. Following fracturing, the gas production rate stabilized at 10 Mscf/day within water production of 18 bpd. The Western Research Institute (WRI) CBM model was used to design a 14-day stimulation cycle followed by a 30-day production period. A maximum injection pressure of 1,200 psig to remain well below the fracture pressure was selected. Model predictions were 20 Mscf/day of air injection for 14 days, a one-day shut-in, then flowback. The predicted flowback

  17. Nebraska Nuclear Profile - Fort Calhoun

    U.S. Energy Information Administration (EIA) Indexed Site

    Fort Calhoun" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date" 1,478,"3,701",88.4,"PWR","application/vnd.ms-excel","application/vnd.ms-excel" ,478,"3,701",88.4

  18. Fort Drum integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  19. Fort Drum integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  20. Fort Collins Utilities - Residential and Small Commercial Appliance...

    Broader source: Energy.gov (indexed) [DOE]

    Star dishwashers. Applications for equipment rebates are available on the Fort Collins web site as well as at select local manufacturers and retailers. Fort Collins Utilities...

  1. An Evaluation of the Fort Polk Energy Savings Performance Contract...

    Office of Scientific and Technical Information (OSTI)

    An Evaluation of the Fort Polk Energy Savings Performance Contract Citation Details In-Document Search Title: An Evaluation of the Fort Polk Energy Savings Performance Contract The ...

  2. Cuttings Analysis At Fort Bliss Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Cuttings Analysis At Fort Bliss Area (DOE GTP) Exploration Activity...

  3. Thermochronometry At Fort Bliss Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermochronometry At Fort Bliss Area (DOE GTP) Exploration Activity...

  4. Geothermometry At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Fort Bliss Area (DOE GTP) Exploration Activity...

  5. Radiometrics At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Radiometrics At Fort Bliss Area (DOE GTP) Exploration Activity Details...

  6. Multispectral Imaging At Fort Bliss Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Multispectral Imaging At Fort Bliss Area (DOE GTP) Exploration Activity...

  7. Fort Boise Veteran's Hospital District Heating Low Temperature...

    Open Energy Info (EERE)

    Fort Boise Veteran's Hospital District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Fort Boise Veteran's Hospital District Heating Low Temperature...

  8. Pressure Temperature Log At Fort Bliss Area (DOE GTP) | Open...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Pressure Temperature Log At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss...

  9. Renewable Energy Opportunities at Fort Drum, New York (Technical...

    Office of Scientific and Technical Information (OSTI)

    Renewable Energy Opportunities at Fort Drum, New York Citation Details In-Document Search Title: Renewable Energy Opportunities at Fort Drum, New York You are accessing a ...

  10. Fort Pierce Utilities Auth | Open Energy Information

    Open Energy Info (EERE)

    Utilities Auth Jump to: navigation, search Name: Fort Pierce Utilities Auth Place: Florida Phone Number: (772) 466-1600 Website: www.fpua.com Outage Hotline: (772) 466-1600...

  11. Fort Collins Utilities- Residential Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Fort Collins Utilities offers a number of appliance and recycling rebates to residential and small commercial customers. The appliance rebate program offers a $50 rebate for Energy Star rated...

  12. Fort Valley Utility Comm | Open Energy Information

    Open Energy Info (EERE)

    Fort Valley Utility Comm Place: Georgia Phone Number: 478-825-7701 Website: fvutil.com Twitter: @fvutil Facebook: https:www.facebook.comfvutil Outage Map: fvutil.comnews...

  13. Fort Washington, Pennsylvania: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    You can help OpenEI by expanding it. Fort Washington is a census-designated place in Montgomery County, Pennsylvania.1 References US Census Bureau 2005 Place to 2006 CBSA...

  14. Renewable Energy Opportunities at Fort Hood, Texas

    SciTech Connect (OSTI)

    Solana, Amy E.; Warwick, William M.; Orrell, Alice C.; Russo, Bryan J.; Parker, Kyle R.; Weimar, Mark R.; Horner, Jacob A.; Manning, Anathea

    2011-11-14

    This report presents the results of Pacific Northwest National Laboratory's (PNNL) follow-on renewable energy (RE) assessment of Fort Hood. Fort Hood receives many solicitations from renewable energy vendors who are interested in doing projects on site. Based on specific requests from Fort Hood staff so they can better understand these proposals, and the results of PNNL's 2008 RE assessment of Fort Hood, the following resources were examined in this assessment: (1) Municipal solid waste (MSW) for waste-to-energy (WTE); (2) Wind; (3) Landfill gas; (4) Solar photovoltaics (PV); and (5) Shale gas. This report also examines the regulatory issues, development options, and environmental impacts for the promising RE resources, and includes a review of the RE market in Texas.

  15. Fort Sill Apache Energy Planning Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Apache Fort Sill Apache Energy Planning Project Energy Planning Project Rebecca Ware Energy/Environmental Director Fort Sill Apache Tribe Apache, Oklahoma 73005 580-588-2298 DOE Tribal Energy Program Review October 2005 2 Project Overview To create an Energy Office within the Tribal Structure To complete an Energy Analysis of Tribal Building Space, current and proposed To develop a Tribal Strategic Energy Plan 3 Project Location Southwest Oklahoma Tribal Headquarters, Apache, Oklahoma East Gore,

  16. Fort Sill Apache Energy Planning Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Apache Fort Sill Apache Energy Planning Project Energy Planning Project Fort Sill Apache Tribe Apache, Oklahoma 73005 580-588-2298 Vanessa Vance Robles - Energy Coordinator October 20, 2004 2 Project Overview Project Overview To create an Energy Office within the Tribal Structure To complete an Energy Analysis of Tribal Building Space, current and proposed To Develop a Tribal Strategic Energy Plan 3 Project Location Project Location Southwestern Oklahoma * Tribal Headquarters, Apache, Oklahoma *

  17. High-temperature gas-cooled reactor safety studies for the Division of Reactor Safety Research. Quarterly progress report, January 1-March 31, 1980

    SciTech Connect (OSTI)

    Ball, S.J.; Cleveland, J.C.; Conklin, J.C.; Harrington, R.M.

    1980-08-01

    Work continued on development of the ORTAP, ORECA, and BLAST codes; and verification studies were continued on the ORECA, CORTAP, and BLAST codes. An improved steam turbine plant model (ORTURB) for use in ORTAP was developed and checked. Predictions from BLAST, CORTAP, and ORECA were compared with various transient test data from the Fort St. Vrain reactor.

  18. FORTE spacecraft vibration mitigation. Final report

    SciTech Connect (OSTI)

    Maly, J.R.

    1996-02-01

    This report documents work that was performed by CSA Engineering, Inc., for Los Alamos National Laboratory (LANL), to reduce vibrations of the FORTE spacecraft by retrofitting damped structural components into the spacecraft structure. The technical objective of the work was reduction of response at the location of payload components when the structure is subjected to the dynamic loading associated with launch and proto-qualification testing. FORTE is a small satellite that will be placed in orbit in 1996. The structure weighs approximately 425 lb, and is roughly 80 inches high and 40 inches in diameter. It was developed and built by LANL in conjunction with Sandia National Laboratories Albuquerque for the United States Department of Energy. The FORTE primary structure was fabricated primarily with graphite epoxy, using aluminum honeycomb core material for equipment decks and solar panel substrates. Equipment decks were bonded and bolted through aluminum mounting blocks to adjoining structure.

  19. Renewable Energy Opportunities at Fort Sill, Oklahoma

    SciTech Connect (OSTI)

    Boyd, Brian K.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

    2011-03-31

    This document provides an overview of renewable resource potential at Fort Sill, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Sill took place on June 10, 2010.

  20. Renewable Energy Opportunities at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Solana, Amy E.; Boyd, Brian K.; Horner, Jacob A.; Gorrissen, Willy J.; Orrell, Alice C.; Weimar, Mark R.; Hand, James R.; Russo, Bryan J.; Williamson, Jennifer L.

    2010-11-17

    This document provides an overview of renewable resource potential at Fort Polk, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Polk took place on February 16, 2010.

  1. Fort Defiance, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    OpenEI by expanding it. Fort Defiance is a census-designated place in Apache County, Arizona.1 US Recovery Act Smart Grid Projects in Fort Defiance, Arizona Navajo Tribal...

  2. Fort Pierce Utilities Authority- Solar Water Heating Rebate

    Office of Energy Efficiency and Renewable Energy (EERE)

    Note: Fort Pierce Utilities Authority has completed its rebate program for 2015. Check the website for updates.

  3. Fort Bragg Embraces Groundbreaking Heat Pump Technology

    SciTech Connect (OSTI)

    none,

    2013-03-01

    The U.S. Army’s Fort Bragg partnered with the Department of Energy (DOE) to develop and implement solutions to build new, low-energy buildings that are at least 50% below Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of North America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) Program.

  4. Renewable Energy Opportunities at Fort Hood, Texas

    SciTech Connect (OSTI)

    Chvala, William D.; Warwick, William M.; Dixon, Douglas R.; Solana, Amy E.; Weimar, Mark R.; States, Jennifer C.; Reilly, Raymond W.

    2008-06-30

    The document provides an overview of renewable resource potential at Fort Hood based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 DoD Renewables Assessment. This effort focuses on grid-connected generation of electricity from renewable energy sources and also ground source heat pumps for heating and cooling buildings, as directed by IMCOM.

  5. Fort Mojave Indian Tribe- 2003 Project

    Broader source: Energy.gov [DOE]

    The Fort Mojave Tribe, whose reservation is located along the Colorado River in the states of Arizona, California, and Nevada, has a need for increased energy supplies resulting from aggressive and successful economic development projects undertaken by the tribe in the last decade. While it is possible to contract for additional energy supplies from fossil fuel sources, as an alternative, the tribe will investigate the feasibility and desirability of producing power from renewable energy sources.

  6. City of Fort Collins Comment on Information Collection Extension, October

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 | Department of Energy City of Fort Collins Comment on Information Collection Extension, October 2011 City of Fort Collins Comment on Information Collection Extension, October 2011 The City of Fort Collins provided comments to the Department of Energy's notice of intent to seek approval of an extension of Information Collection 1910-5149 for Recovery Act Smart Grid Investment Grant reporting for four years, which was published in the Federal Register August 10, 2011, Vol. 76, No. 154,

  7. SPIDERS Phase 2 Fort Carson Technology Transition Consolidated Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SPIDERS Phase 2 Fort Carson Technology Transition Consolidated Report SPIDERS Phase 2 Fort Carson Technology Transition Consolidated Report Final program public report for phase 2 summarizes the key outcomes generated during the second phase of the Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD), which was implemented at Fort Carson, Colorado, during 2013-2014. The public

  8. Thermal Gradient Holes At Cove Fort Area - Vapor (Warpinski,...

    Open Energy Info (EERE)

    Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum...

  9. Thermal Gradient Holes At Cove Fort Area (Warpinski, Et Al.,...

    Open Energy Info (EERE)

    Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum...

  10. Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et...

    Open Energy Info (EERE)

    Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey...

  11. Controlled Source Audio MT At Cove Fort Area - Liquid (Combs...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Controlled Source Audio MT At Cove Fort Area - Liquid (Combs 2006) Exploration Activity Details Location Cove...

  12. Fort Collins Utilities- Efficiency Works- Commercial New Construction Incentive Program

    Broader source: Energy.gov [DOE]

    Fort Collins Utilities offers incentives for their commercial customers to design and build high performance buildings through their Integrated Design Assistance Program. The program offers two...

  13. Helping Fort Carson Meet DOD Energy Goals - Continuum Magazine...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... electric vehicle integration, microgrid design, technology demonstration ... vehicles, and a renewable energy management unit with a microgrid system at Fort Carson. ...

  14. Fort Collins Utilities- Commercial and Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Fort Collins provides businesses incentives for new construction projects and existing building retrofits. The Electric Efficiency Program encourages companies to retrofit facilities with new...

  15. Direct-Current Resistivity Survey At Cove Fort Area (Warpinski...

    Open Energy Info (EERE)

    Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current...

  16. Direct-Current Resistivity Survey At Cove Fort Area - Vapor ...

    Open Energy Info (EERE)

    2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002)...

  17. Direct-Current Resistivity Survey At Cove Fort Area - Liquid...

    Open Energy Info (EERE)

    Direct-Current Resistivity Survey At Cove Fort Area - Liquid (Combs 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current...

  18. Geographic Information System At Cove Fort Area - Vapor (Nash...

    Open Energy Info (EERE)

    Unknown Notes An example, shown in Figure 1, shows results from the classification of big sagebrush (Artimesia tridentata) spectra, acquired over the Cove Fort-Sulphurdale,...

  19. Geographic Information System At Cove Fort Area (Nash, Et Al...

    Open Energy Info (EERE)

    Unknown Notes An example, shown in Figure 1, shows results from the classification of big sagebrush (Artimesia tridentata) spectra, acquired over the Cove Fort-Sulphurdale,...

  20. Spontaneous Potential At Fort Bidwell Area (Laney, 2005) | Open...

    Open Energy Info (EERE)

    Location Fort Bidwell Area Exploration Technique Spontaneous Potential Well Log Activity Date Usefulness not indicated DOE-funding Unknown Notes Magnetotelluric Imaging, G....

  1. Fort Defiance, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Act Smart Grid Projects in Fort Defiance, Arizona Navajo Tribal Utility Association Smart Grid Project References US Census Bureau 2005 Place to 2006 CBSA Retrieved from...

  2. Targeting Net Zero Energy at Fort Carson: Assessment and Recommendatio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations Prepared for the U.S. Department of Energy Federal Energy Management Program By National Renewable Energy ...

  3. MHK Projects/Fort Adams | Open Energy Information

    Open Energy Info (EERE)

    Fort Adams < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... "minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":...

  4. Fort Snelling, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Incorporated place and minor civil division population dataset (All States, all geography) Retrieved from "http:en.openei.orgwindex.php?titleFortSnelling,Minnesota&old...

  5. Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Exploration Activity Details...

  6. Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002)...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location...

  7. U.S. Army Fort Carson Interconnection Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Agreement U.S. Army Fort Carson Interconnection Agreement Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA). Download the U.S. Army Fort Carson interconnection agreement. (1.77 MB) More Documents & Publications U.S. Army Fort Carson Interconnection Agreement Fort Carson Photovoltaic System U.S. Army Fort Carson Environmental Document GovEnergy 2008 Session

  8. Ground Gravity Survey At Fort Bliss Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Ground Gravity Survey At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Fort Bliss Area (DOE...

  9. Resistivity Log At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Resistivity Log At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort...

  10. Slim Holes At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Slim Holes At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss...

  11. 2-M Probe At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: 2-M Probe At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area...

  12. Core Analysis At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss...

  13. Density Log at Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Density Log at Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss...

  14. Flow Test At Fort Bliss Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area...

  15. via Spence St 39 min

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    via Spence St 39 min

  16. Master environmental plan for Fort Devens, Massachusetts

    SciTech Connect (OSTI)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. . Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  17. Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations

    SciTech Connect (OSTI)

    Anderson, K.; Markel, T.; Simpson, M.; Leahey, J.; Rockenbaugh, C.; Lisell, L.; Burman, K.; Singer, M.

    2011-10-01

    The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers to a regional secure smart grid.

  18. Fort Bliss, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    stub. You can help OpenEI by expanding it. Fort Bliss is a census-designated place in El Paso County, Texas.1 References US Census Bureau 2005 Place to 2006 CBSA Retrieved...

  19. City of Fort Collins, Colorado (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Average Rates Residential: 0.0926kWh Commercial: 0.0737kWh Industrial: 0.0562kWh The following table contains monthly sales and revenue data for Fort Collins City...

  20. Fort Pierce Utilities Authority- Residential Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Fort Pierce Utilities Authority offers a variety of incentives for their residential customers to save energy in their homes. Rebates are available for room A/C units, insulation upgrades, central...

  1. Fort Collins, Colorado on Track to Net Zero

    Broader source: Energy.gov [DOE]

    The City of Fort Collins, Colorado, is embarking on an exciting new project that aims to reduce peak demand and help the city reduce its energy footprint to zero. Yes, zero. Find out how.

  2. Multispectral Imaging At Cove Fort Area (Laney, 2005) | Open...

    Open Energy Info (EERE)

    to be successful and resulted in the Following published paper: Nash, G. D., J. N. Moore, and T. Sperry, 2003. "Vegetal-spectral anomaly detection at the Cove Fort-Sulphurdale...

  3. City of Fort Collins Comment on Information Collection Extension...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    City of Fort Collins provided comments to the Department of Energy's notice of intent to seek approval of an extension of Information Collection 1910-5149 for Recovery Act Smart ...

  4. Fort Collins Utilities- Residential and Small Commercial Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Fort Collins Utilities offers a number of appliance and recycling rebates to residential and small commercial customers. The appliance rebate program offers a $50 rebate for Energy Star rated...

  5. Fort McKinley, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    You can help OpenEI by expanding it. Fort McKinley is a census-designated place in Montgomery County, Ohio.1 References US Census Bureau 2005 Place to 2006 CBSA Retrieved...

  6. Littoral processes: US Coast Guard Station, Fort Point, San Francisco

    SciTech Connect (OSTI)

    Ecker, R.M.; Whelan, G.

    1983-10-01

    The US Coast Guard Station, Fort Point is located three-quarters of a nautical mile southeast of the Golden Gate Strait, the entrance to San Francisco Bay. The existing storm wave conditions at Fort Point Station pier make it extremely dangerous for the SAR crews to get on and off the Motor Life Boats at times requiring the vessels to be moored at the San Francisco Yacht Harbor about 1.5 miles east of the Fort Point Station. To mitigate these harsh working conditions the US Coast Guard is considering the feasibility of constructing suitable all-weather moorings for the three Motor Life Boats at the Fort Point Station to enable unimpeded SAR operations, to provide safe working conditions for Coast Guard small boat crews, and to improve small boat maintenance conditions at Fort Point Station. The purpose of this report is to identify, analyze and evaluate physical environmental factors that could affect all-weather moorings siting, configuration and entrance location, as well as potential post construction alterations to littoral conditions and processes. This report includes a description of the site, description of pertinent littoral processes, evaluation of how these processes could affect construction of all-weather moorings, and discussion of design considerations, as well as mitigation measures to minimize potential adverse effects to the physical environment. 19 references, 27 figures, 26 tables.

  7. Renewable Energy Opportunities at Fort Campbell, Tennessee/Kentucky

    SciTech Connect (OSTI)

    Hand, James R.; Horner, Jacob A.; Kora, Angela R.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

    2011-03-31

    This document provides an overview of renewable resource potential at Fort Campbell, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Campbell took place on June 10, 2010.

  8. Renewable Energy Opportunities at Fort Drum, New York

    SciTech Connect (OSTI)

    Brown, Scott A.; Orrell, Alice C.; Solana, Amy E.; Williamson, Jennifer L.; Hand, James R.; Russo, Bryan J.; Weimar, Mark R.; Rowley, Steven; Nesse, Ronald J.

    2010-10-20

    This document provides an overview of renewable resource potential at Fort Drum, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Drum took place on May 4 and 5, 2010.

  9. El Paso County Geothermal Project at Fort Bliss

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objective: Determine if, and where, economically viable low temperature geothermal resources might exist in the McGregor test area Â…or if necessary at other lesser known sites that exist on the Fort Bliss Military Reservation Â…and to determine at what location they can be best accessed without compromising the tactical and strategic missions of Fort Bliss. Determine if identified resources have adequate temperatures and flow rates/volumes to justify development at any scale, with an eye toward the 20 megawatt target identified. Over base need: 45 megawatts.

  10. Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al...

    Open Energy Info (EERE)

    Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) (Redirected from Direct-Current Resistivity At Cove Fort Area - Vapor (Warpinski, Et Al., 2002)) Jump to:...

  11. U.S. Army Fort Carson Environmental Document | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Document U.S. Army Fort Carson Environmental Document Document describes the sample environmental planning for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA). Download the U.S. Army Fort Carson environmental document. (2.59 MB) More Documents & Publications U.S. Army Fort Carson Photovoltaics Project Lease Paducah Site Management Plan ULP_MAP

  12. Project Reports for Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 2005 Project

    Broader source: Energy.gov [DOE]

    Two phases of work are proposed that build upon the current economic development goals of the Fort Peck Tribes

  13. Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 2005 Project

    Broader source: Energy.gov [DOE]

    Two phases of work are proposed that build upon the current economic development goals of the Fort Peck Tribes.

  14. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  15. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  16. Three Affiliated Tribes of the Fort Berthold Reservation- 2004 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Three Affiliated Tribes of the Fort Berthold Reservation, located on the Little Missouri River in central North Dakota, will analyze, qualify, and quantify the feasibility of developing, owning, and operating a commercial wind facility on lands selected and owned by the tribe.

  17. Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fairfield LP | Department of Energy 3 Boralex Fort Fairfield LP Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort Fairfield LP Application from Boralex Fort Fairfield LP to export electric energy to Canada Application to Export Electric Energy OE Cocket No. EA-353 Boralex Fort Fairfield LP (1.44 MB) More Documents & Publications EA-353 Boralex Ashland LP EA-353 Boralex Ashland LP Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort Fairfield LP

  18. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    SciTech Connect (OSTI)

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  19. Project Reports for Fort Mojave Indian Tribe- 2003 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Fort Mojave Tribe, whose reservation is located along the Colorado River in the states of Arizona, California, and Nevada, has a need for increased energy supplies resulting from aggressive and successful economic development projects undertaken by the tribe in the last decade. While it is possible to contract for additional energy supplies from fossil fuel sources, as an alternative, the tribe will investigate the feasibility and desirability of producing power from renewable energy sources.

  20. Fort Yukon Gains Heat and Insight with Biomass Project

    Broader source: Energy.gov [DOE]

    In 2005, residents of the Native Village of Fort Yukon were seeking a better, less costly way to heat the village’s common buildings and shared water system. At that time, leaders of the 600-person community eight miles north of the Arctic Circle began researching more efficient fuel options than diesel or fuel oil for their village, which is accessible by boat during the summer but only via snowmobiles and airplanes in the winter.

  1. Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assiniboine & Sioux Tribes of the Fort Peck Indian Reservation Office of Energy/Economic Development November 15, 2011 EECBG * Train 6 installers of GSHP at the IGSHPA * Install 9 GSHP on Tribal houses * Monitor savings via electric bills Ground Source Heat Pump Installer Training * International Ground Source Heat Pump Association (IGSHPA) * Aug 23-26, 2011 * Stillwater, Oklahoma * Certified in Socket & Butt Fusion IGSHPA Training Installer Team IGSHPA Training GSHP Geothermal Drilling

  2. Geothermal heat pumps at Fort Polk: Early results

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.

    1996-12-31

    At Fort Polk, LA an entire city (4,003 military family housing units) is being converted to geothermal heat pumps (GHP) under a performance contract. At the same time other efficiency measures such as compact fluorescent lights (CFLs), low-flow water outlets, and attic insulation are being installed. If these contracts and this technology are to be used widely in US Department of Defense (DoD) facilities and other public buildings, better data from actual projects is the key. Being the first GHP project of this type and size, Fort Polk proved to be very challenging for all concerned. To get from RFP to start of construction took several years. This hard work by others created a once-in-a-lifetime opportunity to address many of the due diligence issues that delayed the Fort Polk project. So that future projects can move faster, an evaluation has been undertaken to address the following barriers: absence of a documented large-scale demonstration of GHP energy, demand, and maintenance savings (a barrier to acceptance by federal customers, performance contractors, and investors); newness of large-scale facility capital renewal procurements at federal facilities under energy savings performance contracts (ESPCs) or traditional appropriations (lack of case studies); and variability in current GHP design tools (increases risks and costs for federal customers, performance contractors, investors and designers). This paper presents early energy and demand savings results based on data collection through January 1996.

  3. AmeriFlux US-Dix Fort Dix

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Clark, Ken [USDA Forest Service

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-Dix Fort Dix. Site Description - The Fort Dix site is located in the upland forests of the New Jersey Pine Barrens, the largest continuous forested landscape on the Northeastern coastal plain. Upland forests occupy 62% of the 1.1 million acre Pine Barrens and can be divided into three dominant stand types, Oak/Pine (19.1%), Pine/Oak (13.1%), and Pitch Pine/Scrub oak (14.3%). The majority of mature upland forests are the product of regeneration following late 19th century logging and charcoaling activities. Gypsy moths first appeared in the Pine Barrens of New Jersey in 1966. Since the time of arrival, the upland forest stands have undergone several episodes of defoliation, the most significant occurred in 1972, 1981, and 1990. In recent years, the overstory oaks and understory oaks and shrubs of the Fort Dix stand, underwent two periods of defoliation by Gypsy moth, in 2006 and 2007. During these two years, maximum leaf area reached only 70% of the 2005 summer maximum.

  4. ST. LCUIS ST. LallS JOKIN KFms Clrv S!. LrMS ST. Lcm

    Office of Legacy Management (LM)

    Ho. 30 !2121/87 smt6w cm ST. LCUIS ST. LallS JOKIN KFms Clrv S!. LrMS ST. Lcm

  5. DOE - Office of Legacy Management -- Reactor Site - Fort Belvoir - VA 0-02

    Office of Legacy Management (LM)

    Reactor Site - Fort Belvoir - VA 0-02 FUSRAP Considered Sites Site: REACTOR SITE - FORT BELVOIR (VA.0-02 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Fort Belvoir , Virginia VA.0-02-1 Evaluation Year: 1987 VA.0-02-1 Site Operations: No evidence of AEC involvement with reactor operations. AEC conducted health and safety inspections of this site. Probably a licensed operation. VA.0-02-1 Site Disposition:

  6. Building America Whole-House Solutions for New Home: Fort Devens: Cold

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Climate Market-Rate Townhomes | Department of Energy Building America Whole-House Solutions for New Home: Fort Devens: Cold Climate Market-Rate Townhomes Building America Whole-House Solutions for New Home: Fort Devens: Cold Climate Market-Rate Townhomes Twelve townhomes constructed at a decommissioned army base incorporated efficiency upgrades to achieve a HERS Index score of 41 before adding renewables. Fort Devens: Cold Climate Market-Rate Townhomes Targeting HERS Index of 40 - Harvard,

  7. Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002...

    Open Energy Info (EERE)

    Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove...

  8. Ground Gravity Survey At Cove Fort Area (Toksoz, Et Al, 2010...

    Open Energy Info (EERE)

    Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes We...

  9. Thermal Gradient Holes At Fort Bliss Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Fort Bliss Area (DOE GTP) Exploration Activity...

  10. Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al...

    Open Energy Info (EERE)

    Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity...

  11. Modeling-Computer Simulations At Cove Fort Area (Toksoz, Et Al...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Cove Fort Area (Toksoz, Et Al, 2010) Exploration Activity Details...

  12. Application to Export Electric Energy OE Docket No. EA-421 ReEnergy Fort

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fairfield LLC | Department of Energy Fairfield LLC Application to Export Electric Energy OE Docket No. EA-421 ReEnergy Fort Fairfield LLC Application from ReEnergy Fort Fairfield LLC to export electric energy to Canada. EA-421 ReEnergy Fort Fairfield Supplemental (CN).pdf (1019.49 KB) More Documents & Publications Application to Export Electric Energy OE Docket No. EA-421 ReEnergy Fort Fairfield, LLC: Federal Register Notice, Volume 81, No. 120 - June 22, 2016 Application to Export

  13. U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-04-01

    FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.

  14. U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling

    SciTech Connect (OSTI)

    2010-04-01

    FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.

  15. Poudre High School From Fort Collins , Colorado Wins U.S. Department...

    Energy Savers [EERE]

    ... East Brunswick, New Jersey Edwin O. Smith High School, Storrs, Connecticut Homestead ... North Dakota Southside High School, Fort Smith, Arkansas Texas Academy of Mathematics and ...

  16. An Evaluation of the Fort Polk Energy Savings Performance Contract

    SciTech Connect (OSTI)

    Hughes, Patrick; Shonder, John A

    1998-08-01

    The US Army, in cooperation with an energy services company (ESCO), used private capital to retrofit 4003 family housing units on the Fort Polk, Louisiana, military base with geothermal heat pumps (GHPs). The project was performed under an energy savings performance contract (ESPC) that provides for the army and the ESCO to share the cost savings realized through the energy retrofit over the 20-year life of the contract. Under the terms of the contract, the ESCO is responsible for maintaining the GHPs and provides ongoing measurement and verification (M&V) to assure cost and energy savings to the Army. An independent evaluation conducted by the Department of Energy's Oak Ridge National Laboratory indicates that the GHPS systems in combination with other energy retrofit measures have reduced annual whole-community electrical consumption by 33%, and natural gas consumption by 100%. These energy savings correspond to an estimated reduction in CO{sub 2} emissions of 22,400 tons per year. Peak electrical demand has been reduced by 43%. The electrical energy and demand savings correspond to an improvement in the whole-community annual electric load factor from 0.52 to 0.62. As a result of the project, Fort Polk saves about $450,000 annually and benefits from complete renewal of the major energy consuming systems in family housing and maintenance of those systems for 20 years. Given the magnitude of the project, the cost and energy savings achieved, and the lessons learned during its design and implementation, the Fort Polk ESPC can provide a model for other housing-related energy savings performance contracts in both the public and private sectors.

  17. An evaluation of the Fort Polk energy savings performance contract

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.

    1998-11-01

    The US Army, in cooperation with an energy services company (ESCO), used private capital to retrofit 4,003 family housing units on the Fort Polk, Louisiana, military base with geothermal heat pumps (GHPs). The project was performed under an energy savings performance contract (ESPC) that provides for the Army and the ESCO to share the cost savings realized through the energy retrofit over the 20-year life of the contract. Under the terms of the contract, the ESCO is responsible for maintaining the GHPs and provides ongoing measurement and verification (M and V) to assure cost and energy savings to the Army. An independent evaluation conducted by the Department of Energy`s Oak Ridge National Laboratory indicates that the GHP systems in combination with other energy retrofit measures have reduced annual whole-community electrical consumption by 33%, and natural gas consumption by 100%. These energy savings correspond to an estimated reduction in CO{sub 2} emissions of 22,400 tons per year. Peak electrical demand has been reduced by 43%. The electrical energy and demand savings correspond to an improvement in the whole-community annual electric load factor from 0.52 to 0.62. As a result of the project, Fort Polk saves about $450,000 annually and benefits from complete renewal of the major energy consuming systems in family housing and maintenance of those systems for 20 years. Given the magnitude of the project, the cost and energy savings achieved, and the lessons learned during its design and implementation, the Fort Polk ESPC can provide a model for other housing-related energy savings performance contracts in both the public and private sectors.

  18. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  19. Fort Yukon Gets Fired Up Over Biomass CHP Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gets Fired Up Over Biomass CHP Project In 2005, the Native Village of Fort Yukon sought a less costly fuel than diesel to heat common buildings, as well as a water system that could operate at -60ËšF. As village leaders researched the options, they investigated biomass as a potential resource and learned about sustainable forest management practices. DOE funded the Council of Athabascan Tribal Governments (CATG)-a 10-tribe consortium-to study a regional wood energy program in 2007. The following

  20. Community Based Wood Heat System for Fort Yukon

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community Based Wood Heat System for Fort Yukon A Systems Integration Bill Wall, PhD Alaska Wood Energy Associates Village Survival Highest Energy Costs in Nation Project Initiation Partners 2005 ď‚— Council of Athabascan Tribal Government ď‚— Alaska Village Initiatives ď‚— Original Goal: Displace as much diesel fuel as possible through development of a sustainable community based program ď‚— $0.51 per kWh electricity ď‚— $6.75 per gallon gasoline ď‚— $7.00 per gallon heating fuel ď‚— $200 per

  1. Wind Monitoring Report for Fort Wainwright's Donnelly Training Area

    SciTech Connect (OSTI)

    Orrell, Alice C.; Dixon, Douglas R.

    2011-01-18

    Using the wind data collected at a location in Fort Wainwright’s Donnelly Training Area (DTA) near the Cold Regions Test Center (CRTC) test track, Pacific Northwest National Laboratory (PNNL) estimated the gross and net energy productions that proposed turbine models would have produced exposed to the wind resource measured at the meteorological tower (met tower) location during the year of measurement. Calculations are based on the proposed turbine models’ standard atmospheric conditions power curves, the annual average wind speeds, wind shear estimates, and standard industry assumptions.

  2. Fort Carson Building 1860 Biomass Heating Analysis Report

    SciTech Connect (OSTI)

    Hunsberger, Randolph; Tomberlin, Gregg; Gaul, Chris

    2015-09-01

    As part of the Army Net-Zero Energy Installation program, the Fort Carson Army Base requested that NREL evaluate the feasibility of adding a biomass boiler to the district heating system served by Building 1860. We have also developed an Excel-spreadsheet-based decision support tool--specific to the historic loads served by Building 1860--with which users can perform what-if analysis on gas costs, biomass costs, and other parameters. For economic reasons, we do not recommend adding a biomass system at this time.

  3. Landform technology at fort polk, louisiana: lessons learned. Final report

    SciTech Connect (OSTI)

    Smith, J.L.; Grafton, J.D.; Mann, D.K.

    1992-03-01

    Fort Polk, LA, is located in central Vernon Parish in West-Central Louisiana, about 6 miles southeast of the town of Leesville. In early 1983, a combination of factors prompted Fort Polk to explore alternatives for disposing of sewage sludge and contaminated soil. Changes in Louisiana's Solid Waste Rules and Regulations ended the practice of disposing of contaminated soil in the installation's landfill. Changing regulations were also affecting the disposal of sewage sludge. The technology investigated in this research is landfarming, a treatment process in which waste is mixed with the surface soil and is degraded, transformed, or immobilized. The surface soil is used as the treatment medium and the process is based primarily on the principle of aerobic decomposition of organic wastes. Compared to other land disposal treatments such as landfills and surface impoundments, landfarming has the potential to reduce monitoring and maintenance costs, as well as cleanup liabilities. Because of these reduced costs and liabilities, and the relatively low initial and operating costs, landfarming has received much attention as an ultimate disposal alternative.

  4. Fort Stewart integrated resource assessment. Volume 3: Resource assessment

    SciTech Connect (OSTI)

    Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

    1993-10-01

    The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

  5. Fort Drum integrated resource assessment. Volume 3, Resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  6. Strategic Energy Management Plan For Fort Buchanan, Puerto Rico

    SciTech Connect (OSTI)

    Parker, Steven A.; Hunt, W. D.

    2001-10-31

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

  7. Solar Energy Development Assistance for Fort Hunter Liggett

    SciTech Connect (OSTI)

    Russo, Bryan J.; Hoffman, Michael G.; Chvala, William D.

    2011-03-30

    Pacific Northwest National Laboratory provided assistance to Fort Hunter Liggett to determine the opportunities for solar energy development on the site. Increasing use of renewable energy is mandated by several executive orders and legislation. Fort Hunter Liggett has many attributes that enhance its suitability for renewable energy development. First, the site is located south of San Francisco in a remote portion of the costal foothills. Brush and forest fires are frequent and often result in power outages, which subsequently impacts the site’s training mission. In addition, the site’s blended electric rate during fiscal year (FY) 2010 was high at 12 ¢/kWh. Lastly, the solar resource is moderately high; the site receives nearly 5.7 kWh/m2/day on a south facing, latitude-tilted surface. In light of these factors, the site is a clear candidate for a solar photovoltaic array. Prior to Pacific Northwest National Laboratory’s (PNNL) involvement, the site secured funding for a 1 megawatt (MW) photovoltaic (PV) array that will also provide shading for site vehicles. To best implement this project, PNNL conducted a site visit and was tasked with providing the site technical guidance and support regarding module selection, array siting, and other ancillary issues.

  8. Thermal design of the fast-on-orbit recording of transient events (FORTE) satellite

    SciTech Connect (OSTI)

    Akau, R.L.; Behr, V.L.; Whitaker, R.

    1994-10-01

    Analytical tools were used to design a thermal control system for the FORTE satellite. An overall spacecraft thermal model was developed to provide boundary temperatures for detailed thermal models of the FORTE instruments. The thermal design will be presented and thermal model results discussed.

  9. Fort Bliss Geothermal Area Data: Temperature profile, logs, schematic model and cross section

    SciTech Connect (OSTI)

    Adam Brandt

    2015-11-15

    This dataset contains a variety of data about the Fort Bliss geothermal area, part of the southern portion of the Tularosa Basin, New Mexico. The dataset contains schematic models for the McGregor Geothermal System, a shallow temperature survey of the Fort Bliss geothermal area. The dataset also contains Century OH logs, a full temperature profile, and complete logs from well RMI 56-5, including resistivity and porosity data, drill logs with drill rate, depth, lithology, mineralogy, fractures, temperature, pit total, gases, and descriptions among other measurements as well as CDL, CNL, DIL, GR Caliper and Temperature files. A shallow (2 meter depth) temperature survey of the Fort Bliss geothermal area with 63 data points is also included. Two cross sections through the Fort Bliss area, also included, show well position and depth. The surface map included shows faults and well spatial distribution. Inferred and observed fault distributions from gravity surveys around the Fort Bliss geothermal area.

  10. Superfund Record of Decision (EPA Region 5): Fort Wayne Reduction, Fort Wayne, Indiana (first remedial action) August 1988. Final report

    SciTech Connect (OSTI)

    Not Available

    1988-08-28

    The 35-acre Fort Wayne site (FW) is a former municipal landfill/waste disposal facility located along the Maumee River just east of the city of Fort Wayne, Allen County, Indiana. Two onsite areas are designated as wetlands. In addition, the site lies within a 100-year flood plain. The site accepted residential and industrial wastes from 1967 to 1976. From May 1967 to August 1970, FW was issued a county permit for public disposal of garbage and rubbish. Wastes were incinerated and the residual ash disposed of onsite. In 1970, FW changed its name to National Recycling Corporation. All solid waste was to be processed through the plant. It was torn down in 1985. Inspection reports indicated that deposited refuse included: industrial and liquid wastes, municipal wastes, garbage, paper, and wood. The site consists of two characteristically different areas reflecting its historical use: the eastern half of the site was used as the municipal/general refuse landfill (approximately 15 acres), and the western half of the site (approximately 5 acres) was used for disposal of industrial wastes, building debris, barrels of unidentified wastes, and residual ash from earlier incineration operations. Presently, soil and ground water are contaminated with 43 chemicals of concern including: metals, organics, PCBs, PAHs, phenols, and VOCs. The selected remedial action for the site is included.

  11. System specification for Fort Hood Solar Cogeneration Facility

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    The characteristics and design and environmental requirements are specified for a solar cogeneration facility at the Fort Hood Army Base in Killeen, Texas. Characteristics of the system and major elements are described, and applicable standards, codes, laws and regulations are listed. Performance requirements for the total system and for each individual subsystem are presented. Survival requirements are given for various environmental extremes, with consideration given to lightning protection and effects of direct or adjacent lightning strikes. Air quality control standards are briefly mentioned. The facility operates in two principal modes: energy collection and energy utilization. The plant is capable of operating in either mode independently or in both modes simultaneously. The system is also operational in transitional and standby/inactive modes. (LEW)

  12. Exploration Drilling and Technology Demonstration At Fort Bliss

    SciTech Connect (OSTI)

    Barker, Ben; Moore, Joe; Segall, Marylin; Nash, Greg; Simmons, Stuart; Jones, Clay; Lear, Jon; Bennett, Carlon

    2014-02-26

    The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before

  13. U.S. Army Fort Carson Photovoltaics Project Lease | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photovoltaics Project Lease U.S. Army Fort Carson Photovoltaics Project Lease Document describes the project lease issued for the Fort Carson photovoltaic (PV) power purchase agreement (PPA). Download the U.S. Army Fort Carson photovoltaics project lease. (685.57 KB) More Documents & Publications SCT&E LNG, LLC - FE Dkt. No. 14-72-LNG SCT&E LNG, LLC - FE Dkt. No. 14-89-LNG SCT&E LNG, LLC - FE DKT. NO. 14-98-LNG NFTA

  14. Poudre High School From Fort Collins , Colorado Wins U.S. Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy National Science Bowl® | Department of Energy Poudre High School From Fort Collins , Colorado Wins U.S. Department of Energy National Science Bowl® Poudre High School From Fort Collins , Colorado Wins U.S. Department of Energy National Science Bowl® April 30, 2007 - 12:45pm Addthis WASHINGTON, DC - Poudre High School from Fort Collins, Colorado won the 2007 U.S. Department of Energy (DOE) National Science Bowl® for high school students today at the National 4-H Youth Conference

  15. Electricity Generation from Geothermal Resources on the Fort Peck Reservation in Northeast Montana

    SciTech Connect (OSTI)

    Carlson, Garry J.; Birkby, Jeff

    2015-05-12

    Tribal lands owned by Assiniboine and Sioux Tribes on the Fort Peck Indian Reservation, located in Northeastern Montana, overlie large volumes of deep, hot, saline water. Our study area included all the Fort Peck Reservation occupying roughly 1,456 sq miles. The geothermal water present in the Fort Peck Reservation is located in the western part of the Williston Basin in the Madison Group complex ranging in depths of 5500 to 7500 feet. Although no surface hot springs exist on the Reservation, water temperatures within oil wells that intercept these geothermal resources in the Madison Formation range from 150 to 278 degrees F.

  16. Application to Export Electric Energy OE Docket No. EA-421 ReEnergy Fort

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fairfield, LLC: Federal Register Notice, Volume 81, No. 120 - June 22, 2016 | Department of Energy Fairfield, LLC: Federal Register Notice, Volume 81, No. 120 - June 22, 2016 Application to Export Electric Energy OE Docket No. EA-421 ReEnergy Fort Fairfield, LLC: Federal Register Notice, Volume 81, No. 120 - June 22, 2016 Application from ReEnergy Fort Fairfield LLC to export electric energy to Canada. Federal Register Notice. EA-421 ReEnergy Fort Fairfield.pdf (170.35 KB) More Documents

  17. St. Bernard Project Update

    Broader source: Energy.gov [DOE]

    The folks at St. Bernard Project are helping survivors of Hurricane Katrina get back into their homes -- and are using new technologies to reduce energy and save money for the returning residents.

  18. Energy Department Recognizes Fort Worth for Leadership in Advancing Energy Efficiency

    Broader source: Energy.gov [DOE]

    As part of the Administration’s effort to cut energy waste in the nation’s buildings, the Energy Department will acknowledge the city of Fort Worth today for its leadership in advancing energy efficiency.

  19. Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 2010 Project

    Broader source: Energy.gov [DOE]

    The feasibility analysis will fully characterize the Fort Peck Reservation’s geothermal resource, as well as examine the economic, technical, environmental, social, and tribal issues involved in developing geothermal resources for electrical generation.

  20. Project Reports for Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 2010 Project

    Broader source: Energy.gov [DOE]

    The feasibility analysis will fully characterize the Fort Peck Reservation’s geothermal resource, as well as examine the economic, technical, environmental, social, and tribal issues involved in developing geothermal resources for electrical generation.

  1. Peter St. John | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    St. John Peter St. John Postdoctoral Researcher, Systems Biology and Metabolic Engineering Peter.StJohn@nrel.gov | 303-275-4399 Education Peter St. John received his B.S. in chemical engineering from Tufts University in 2010, followed by his Ph.D. in chemical engineering from the University of California at Santa Barbara in 2015. During his Ph.D., St. John applied techniques from systems biology and dynamic systems to understand the gene regulatory networks underlying mammalian circadian

  2. Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 2003 Project

    Broader source: Energy.gov [DOE]

    Project goals are to buy, install, and operate a 660-kW wind turbine on the Fort Peck Reservation in the northeast corner of Montana. This collaborative between the tribes, Fort Peck Community College, the Foundation for the American Indian, Tribal Enterprise Community, the local school district, and Montana-Dakota Utilities will defray electricity costs through the use of wind power and use the savings to develop community and education programs, and to foster employment.

  3. Project Reports for Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 2003 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Project goals are to buy, install, and operate a 660-kW wind turbine on the Fort Peck Reservation in the northeast corner of Montana. This collaborative between the tribes, Fort Peck Community College, the Foundation for the American Indian, Tribal Enterprise Community, the local school district, and Montana-Dakota Utilities will defray electricity costs through the use of wind power and use the savings to develop community and education programs, and to foster employment.

  4. Table 2. Ten largest plants by generation capacity, 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"Comanche (CO)","Coal","Public Service Co of Colorado",1410 2,"Craig (CO)","Coal","Tri-State G & T Assn, Inc",1304 3,"Fort St Vrain","Natural gas","Public Service Co of Colorado",969 4,"Rawhide","Natural gas","Platte River Power

  5. HTGR severe accident sequence analysis

    SciTech Connect (OSTI)

    Harrington, R.M.; Ball, S.J.; Kornegay, F.C.

    1982-01-01

    Thermal-hydraulic, fission product transport, and atmospheric dispersion calculations are presented for hypothetical severe accident release paths at the Fort St. Vrain (FSV) high temperature gas cooled reactor (HTGR). Off-site radiation exposures are calculated for assumed release of 100% of the 24 hour post-shutdown core xenon and krypton inventory and 5.5% of the iodine inventory. The results show conditions under which dose avoidance measures would be desirable and demonstrate the importance of specific release characteristics such as effective release height. 7 tables.

  6. Personnel radiation exposure in HTGR plants

    SciTech Connect (OSTI)

    Su, S.; Engholm, B.A.

    1980-01-01

    Occupational radiation exposures in high-temperature gas-cooled reactor (HTGR) plants were assessed. The expected rate of dose accumulations for a large HTGR steam cycle (HTGR-SC) unit is 0.07 man-rem/MW(e)y, while the design basis is 0.17 man-rem/MW(e)y. The comparable figure for actual light water reactor (LWR) experience is 1.3 man-rem/MW(e)y. The favorable HTGR occupational exposure is supported by results from the Peach Bottom Unit No. 1 HTGR and Fort St. Vrain HTGR plants and by operating experience at British gas-cooled reactor (GCR) stations.

  7. EIS-0203: Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs

    Broader source: Energy.gov [DOE]

    This EIS considers programmatic (DOE-wide) alternative approaches to safely, efficiently, and responsibly manage existing and projected quantities of spent nuclear fuel until the year 2035. This amount of time may be required to make and implement a decision on the ultimate disposition of spent nuclear fuel. DOE's spent nuclear fuel responsibilities include fuel generated by DOE production, research, and development reactors; naval reactors; university and foreign research reactors; domestic non-DOE reactors such as those at the National Institute of Standards and Technology and the Armed Forces Radiobiology Research Institute; and special-case commercial reactors such as Fort St. Vrain and the Lynchburg Technology Center.

  8. Habitat Restoration/Enhancement Fort Hall Reservation : 2008 Annual Report.

    SciTech Connect (OSTI)

    Osborne, Hunter

    2009-07-23

    Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2008. Enhancement and protection included sloping, fencing and planting wetlands plugs at sites on Spring Creek (Head-waters). Many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). Physical sampling during 2008 included sediment and depth measurements (SADMS) in Spring Creek at the Car Removal site. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for 5 strata on Spring Creek. Water temperature and chemistry were monitored monthly on Spring Creek, Clear Creek, Diggie Creek, and Portneuf (Jimmy Drinks) and Blackfoot rivers. Fish population densities and biomass were sampled in five reservation streams which included nine sites. Sampling protocols were identical to methods used in past years. Numbers of fish in Spring Creek series remained relatively low, however, there was an increase of biomass overall since 1993. Salmonid fry densities were monitored near Broncho Bridge and were similar to 2006, and 2007, however, as in years past, high densities of macrophytes make it very difficult to see fry in addition to lack of field technicians. Mean catch rate by anglers on Bottoms streams stayed the same as 2007 at 1.5/hr. Numbers of fish larger than 18-inches caught by anglers increased from 2007 at .20 to .26/hr.

  9. Fort Stewart integrated resource assessment. Volume 1, Executive summary

    SciTech Connect (OSTI)

    Larson, L.L.; Keller, J.M.

    1993-10-01

    The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.

  10. FORTE log periodic antenna. Phase 1, Final report

    SciTech Connect (OSTI)

    Not Available

    1993-04-22

    This report summarizes the results of ABLE`s design study of the FORTE deployable log periodic antenna. The resulting Baseline Design of the antenna is the basis for ABLE`s proposal for Phase II of this program. ABLE`s approach to meeting the requirements is to use a coilable ABLE mast as the deployable structure ``backbone`` of the antenna and to use deployable tubes for. the log periodic dipole elements of the antenna. This general approach was adopted at the outset of the Phase I Design Study. The remainder of the study was devoted to detailed design and analysis to properly size these types of mast and antenna elements and to design their deployment mechanisms. Demonstration models of the mast and antenna element deployer were fabricated as part of Phase I study. The study showed that ABLE`s design approach is feasible and can meet all the specified design requirements except the mass limit of 13.5 kg. Results of the design and analysis studies are summarized in this report. The mast and dipole element deployer are to be demonstrated to LANL personnel at the conclusion of this Phase I study.

  11. Liquefied Petroleum Gas (LPG) storage facility study, Fort Gordon, Georgia. Final report

    SciTech Connect (OSTI)

    1992-09-01

    Fort Gordon currently purchases natural gas from Atlanta Gas Light Company under a rate schedule for Large Commercial Interruptible Service. This offers a very favorable rate for `interruptible` gas service, however, Fort Gordon must maintain a base level of `firm gas`, purchased at a significantly higher cost, to assure adequate natural gas supplies during periods of curtailment to support family housing requirements and other single fuel users. It is desirable to provide a standby fuel source to meet the needs of family housing and other single fuel users and eliminate the extra costs for the firm gas commitment to Atlanta Gas Light Company. Therefore, a propane-air standby fuel system is proposed to be installed at Fort Gordon.

  12. Liquefied Petroleum Gas (LPG) storage facility study Fort Gordon, Georgia. Final report

    SciTech Connect (OSTI)

    1992-09-01

    Fort Gordon currently purchases natural gas from Atlanta Gas Light Company under a rate schedule for Large Commercial Interruptible Service. This offers a very favorable rate for `interruptible` gas service, however, Fort Gordon must maintain a base level of `firm gas`, purchased at a significantly higher cost, to assure adequate natural gas supplies during periods of curtailment to support family housing requirements and other single fuel users. It is desirable to provide a standby fuel source to meet the needs of family housing and other single fuel users and eliminate the extra costs for the firm gas commitment to Atlanta Gas Light Company. Therefore, a propane-air standby fuel system is proposed to be installed at Fort Gordon.

  13. Energy engineering analysis program, Fort Polk, Louisiana. Pre-final executive summary, increment `f`

    SciTech Connect (OSTI)

    1987-11-01

    Executive Order 12003, dated 19 July 1977, initiated the U.S. Army`s energy conservation effort. Specifically, the Executive Order led to the development of the Army Facilities Energy Plan which directs Army Staff and Major Army Commands to develop detailed implementation plans for energy conservation. As a result of these directives, the Fort Worth District of the U.S. Army Corps of Engineers contracted for an Energy Engineering Analysis Program (EEAP) at Fort Polk, Louisiana. The EEAP included Increments `A`, `B`, `E`, and `O`.

  14. Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation- 1994 Project

    Broader source: Energy.gov [DOE]

    The Fort Peck Assiniboine and Sioux tribes in northeastern Montana are conducting a wind resource assessment at five sites on their reservation, in conjunction with the Bechtel Corp. Preliminary data collected in mid-1995 showed average wind speeds between 16.3 and 16.8 mph at four of the sites.

  15. EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska

    Broader source: Energy.gov [DOE]

    DOE (lead agency), Denali Commission (cooperating agency) and USDA Rural Utilities Services (cooperating agency) are proposing to provide funding to support the final design and construction of a biomass combined heat and power plant and associated district heating system to the Council of Athabascan Tribal Governments and the Gwitchyaa Zhee Corporation. The proposed biomass district heating system would be located in Fort Yukon Alaska.

  16. Community Environmental Response Facilitation Act (CERFA) report. Fort Des Moines, Des Moines, Iowa. Final report

    SciTech Connect (OSTI)

    Young, B.; Rausch, K.; Kang, J.

    1994-04-01

    This report presents the results of the Community Environmental Response Facilitation Act (CERFA) investigation conducted by The Earth Technology Corporation (TETC) at the Fort Des Moines, a U.S. Government property selected for closure by the Base Realignment and Closure (BRAC) Commission. Under CERFA Federal agencies are required to identify real property that can be immediately reused and redeveloped. Satisfying this objective requires the identification of real property where no hazardous substances or petroleum products, regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), were stored for one year or more, known to have been released, or disposed. Fort Des Moines is a 53.28-acre site located in Polk County, Iowa, within the city limits of Des Moines. The installation's primary mission is to provide support and shelter for the U.S. Army Reserve. Activities associated with the property that have environmental significance are photographic processing, vehicle maintenance, printing, and fuel storage. TETC reviewed existing investigation documents; U.S. Environmental Protection Agency (USEPA), State, and county regulatory records; environmental data bases; and title documents pertaining to Fort Des Moines during this investigation. In addition, TETC conducted interviews and visual inspections of Fort Des Moines as well as visual inspections and data base searches for the surrounding properties. Information in this CERFA Report was current as of April 1994.

  17. Project Reports for Three Affiliated Tribes of the Fort Berthold Reservation- 2004 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Three Affiliated Tribes of the Fort Berthold Reservation, located on the Little Missouri River in central North Dakota, will analyze, qualify, and quantify the feasibility of developing, owning, and operating a commercial wind facility on lands selected and owned by the tribe.

  18. EIS-0069: Solvent Refined Coal-II Demonstration Project, Fort Martin, Monongalia County, West Virginia

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy developed this statement to assess the potential environmental, economic and social impacts associated with the construction and short-term operation of a 6,000-tons-per-stream-day-capacity facility that will demonstrate the technical operability, economic viability, and environmental acceptability of the solvent refined coal process at Fort Martin, West Virginia.

  19. Seismic facies analysis of lacustrine system: Paleocene upper Fort Union Formation, Wind River basin, Wyoming

    SciTech Connect (OSTI)

    Liro, L.M.; Pardus, Y.C.

    1989-03-01

    The authors interpreted seismic reflection data, supported by well control, to reconstruct the stratigraphic development of Paleocene Lake Waltman in the Wind River basin of Wyoming. After dividing the upper Fort Union into eight seismic sequences, the authors mapped seismic attributes (amplitude, continuity, and frequency) within each sequence. Interpretation of the variation in seismic attributes allowed them to detail delta development and encroachment into Lake Waltman during deposition of the upper Fort Union Formation. These deltas are interpreted as high-energy, well-differentiated lobate forms with distinct clinoform morphology on seismic data. Prograding delta-front facies are easily identified on seismic data as higher amplitude, continuous events within the clinoforms. Seismic data clearly demonstrate the time-Transgressive nature of this facies. Downdip of these clinoforms, homogeneous shales, as evidenced by low-amplitude, generally continuous seismic events, accumulated in an interpreted quiet, areally extensive lacustrine setting. Seismic definition of the lateral extent of this lacustrine facies is excellent, allowing them to effectively delineate changes in the lake morphology during deposition of the upper Fort Union Formation. Encasing the upper Fort Union lacustrine deposits are fluvial-alluvial deposits, interpreted from discontinuous, variable-amplitude seismic facies. The authors highlight the correlation of seismic facies data and interpretation to well log data in the Frenchie Draw field to emphasize the accuracy of depositional environment prediction from seismic data.

  20. Set the PACE St. Louis

    Broader source: Energy.gov [DOE]

    Commercial property owners, community associations (e.g., Home Owners Associations), and some residential property owners are eligible for Set the PACE St. Louis. Currently, only residential prop...

  1. St Andrews Fuel Cells | Open Energy Information

    Open Energy Info (EERE)

    St Andrews Fuel Cells Place: Fife, Scotland, United Kingdom Product: A spin-out fuel cell company from the University of St Andrews to work on further prototypes of St Andrews'...

  2. St. Lucie Data Dashboard | Department of Energy

    Energy Savers [EERE]

    Data Dashboard St. Lucie Data Dashboard The data dashboard for St. Lucie, Florida, a partner in the Better Buildings Neighborhood Program. St. Lucie Data Dashboard (300.64 KB) More ...

  3. El Paso County Geothermal Project: Innovative Research Technologies Applied to the Geothermal Reosurce Potential at Fort Bliss

    Broader source: Energy.gov [DOE]

    El Paso County Geothermal Project: Innovative Research Technologies Applied to the Geothermal Reosurce Potential at Fort Bliss presentation at the April 2013 peer review meeting held in Denver, Colorado.

  4. Building America Whole-House Solutions for New Home: Fort Devens: Cold Climate Market-Rate Townhomes

    Broader source: Energy.gov [DOE]

    Fort Devens: Cold Climate Market-Rate Townhomes Targeting HERS Index of 40, Harvard, Massachusetts (Fact Sheet), Building America Case Study: Efficient Solutions for New and Existing Homes, Building Technologies Office (BTO)

  5. Energy Engineering Analysis Program - Fort Polk, Louisiana. Executive summary. Final report

    SciTech Connect (OSTI)

    1986-03-01

    The CRS Group, Inc. is pleased to submit this Final Report covering Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk, Louisiana work accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The work presented in these volumes presents the results in which 32 energy conserving measures (ECM`s) have been investigated for ECIP potential for Increments A (existing buildings including Family Housing) and B (existing utilities and energy distribution systems and a centralized Energy Monitoring and Control System-EMCS). Additionally, five scenarios for implementation of a Central Energy Plant (CEP) were studied under Increment E and an analysis of using waste POL as a fuel source in three scenarios was made. Four projects were analyzed under Increment G to identify additional energy savings.

  6. Methodology for the evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.; White, D.L.; Huang, H.L.

    1998-03-01

    The US Army and a private energy service company are developing a comprehensive energy efficiency project to upgrade the family housing at Fort Polk, Louisiana. The project includes converting the space conditioning systems of more than 4,000 housing units to geothermal (or ground-source) heat pumps (GHPs). This interim report describes the methodology of the evaluation associated with this project, including the field monitoring that has been conducted at the base.

  7. Energy Engineering Analysis Program (EEAP) Fort Polk airfield lighting; lighting retrofit

    SciTech Connect (OSTI)

    1993-03-01

    The purpose of this study is to analyze the existing lighting types and levels at three different maintenance hangars (Buildings. No. 4262, No. 4295, and No. 4297) at Fort Polk and to make recommendations for the most economical and preferred new lighting fixtures, arrangements, and method of control. The Life Cycle Cost In Design (LCCID) program was used to determine the Life Cycle Cost (LCC) and Savings to Investment Ratio (SIR) for the analyzed retrofit for a 20 year study life.

  8. Microsoft Word - Fort Vancouver vehicle report 14-31608 08-11-14.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    608 AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Fort Vancouver National Historic Site Stephen Schey Jim Francfort March 2014 DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

  9. Energy Engineering Analysis Program, Fort Polk, Louisiana. Final executive summary, increment `f`

    SciTech Connect (OSTI)

    1988-06-01

    Executive Order 12003, dated 19 July 1977, initiated the U.S. Army`s energy conservation effort. Specifically, the Executive Order led to the development of the Army Facilities Energy Plan which directs Army Staff and Major Army Commands to develop detailed implementation plans for energy conservation. As a result of these directives, the Fort Worth District of the U.S. Army Corps of Engineers contracted for an Energy Engineering Analysis Program (EEAP) at Fort Polk, Louisiana. The EEAP included Increments `A`, `B`, `E`, and `G`. To accomplish the intent of Increment `P`, namely, providing low cost/no cost energy savings recommendations in the form of specific, practical instructions for use by the Facility Engineer, the following general steps were taken: (1) Consider treasures identified in Detailed Scope of Work. (2) identify other potential Low Cost/No Cost energy Conservation Measures (ECM) through discussions with Fort Polk personnel and field surveys by Graham Associates engineers. (3) Review Increments `A`, `B`, and `G` for ECM`s within the Facility Engineer`s funding authority; $200,000 for alteration projects and $1,000,000 for maintenance and repair type work. (4) Evaluate ECM`s using relevant data for other Increments of the ESAP, and develop new data where appropriate.

  10. St. Lucie County Summary of Reported Data

    Broader source: Energy.gov [DOE]

    Summary of data reported by Better Buildings Neighborhood Program partner St. Lucie County, Florida.

  11. Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort Fairfield LP & Boralex Ashland LP: Federal Register Notice Vol 74 No 151

    Broader source: Energy.gov [DOE]

    Application from Boralex Fort Fairfield LP & Boralex Ashland LP to export electric energy to Canada. Federal Register Notice Vol 74 No 151

  12. St. Louis FUSRAP Lessons Learned

    SciTech Connect (OSTI)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-02-26

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction.

  13. Geothermal heat pump energy savings performance contract at Fort Polk, LA: Lessons learned

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.; Gordon, R.; Giffin, T.

    1997-08-01

    At Fort Polk, LA the space conditioning systems of 4,003 military family housing units have been converted to geothermal heat pumps (GHP) under an energy savings performance contract (ESPC). At the same time, other efficiency measures, such as compact fluorescent lights (CFLs), low-flow shower heads, and attic insulation, were installed. An independent evaluation of the Fort Polk ESPC was carried out. Findings indicate that the project has resulted in a 25.6 million kWh savings in electrical energy use, or 32.4% of the pre-retrofit electrical consumption in family housing, for a typical meteorological year. Peak electrical demand has also been reduced by 6,541 kW, which is 39.6% of the pre-retrofit peak demand. Natural gas savings are about 260,000 therms per year. In addition, the ESPC has allowed the Army to effectively cap its future expenditures for family housing HVAC maintenance at about 77% of its previous costs. Given these successful results, the Fort Polk ESPC can provide a model for other ESPCs in both the public and the private sectors. The purpose of this paper is to outline the method by which the ESPC was engineered and implemented, both from the standpoint of the facility owner (the US Army) and the energy services company (ESCO) which is carrying out the contract. The lessons learned from this experience should be useful to other owners, ESCOs and investors in the implementation of future ESPCs. It should be noted that the energy savings presented in this document are the apparent energy savings observed in the monitored data, and are not to be confused with the contracted energy savings used as the basis for payments. To determine the contracted energy savings, the apparent energy savings may require adjustments for such things as changes in indoor temperature performance criteria, additions of ceiling fans, and other factors.

  14. Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA: Lessons Learned

    SciTech Connect (OSTI)

    Hughes, Patrick; Shonder, John A; Gordon, Richard; Giffin, Tom

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of 4,003 military family housing units have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorecent lights, low-flow shower heads, and attic insulation, were installed. An independent evaluation of the Fort Polk energy savings performance contract was carried out. Findings indicate that the project has resulted in a 25.6 million kWh savings in electrical energy use, or 32.4% of the pre-retrofit electrical consumption in family housing, for a typical meteorological year. Peak electrical demand has also been reduced by about 6,761 kW, which is 40.2% of the pre-retrofit peak demand. Natural gas savings are about 260,000 therms per year. In addition, the energy savings performance contract has allowed the Army to effectively cap its future expenditures for family housing HVAC maintenance at about 77% of its previous costs. Given these successful results, the Fort Polk performance contract can provide a model for other contracts in both the public and private sectors. The purpose of this paper is to outline the method by which the contract was engineed and implemented, both from the standpoint of the facility owner (the U.S. Army) and the energy services company that is carrying out the contract. The lessons learned from this experience should be useful to other owners, service companies, and investors in the implementation of future service contracts. It should be noted that the energy savings presented in this document are the 'apparent' energy savings observed in the monitored data and not to be mistaken for the 'contract' energy savings used as the basis for payments. To determine the 'contracted' energy savings, the 'apparent' energy savings may require adjustments for such things as changes in the indoor temperature performance criteria, additions of ceiling fans, and other factors.

  15. ASSESSMENT OF HYDROCARBON SEEPAGE DETECTION METHODS ON THE FORT PECK RESERVATION, NORTHEAST MONTANA

    SciTech Connect (OSTI)

    Lawrence M. Monson

    2003-06-30

    Surface exploration techniques have been employed in separate study areas on the Fort Peck Reservation in northeastern Montana. Anomalies associated with hydrocarbon seepage are documented in all three areas and a variety of surface exploration techniques can be compared. In a small area with established production, Head Gas and Thermal Desorption methods best match production; other methods also map depletion. In a moderate-size area that has prospects defined by 3D seismic data, Head Gas along with Microbial, Iodine, and Eh soil anomalies are all associated with the best hydrocarbon prospect. In a large area that contains many curvilinear patterns observed on Landsat images, that could represent micro-seepage chimneys, results are inconclusive. Reconnaissance mapping using Magnetic Susceptibility has identified a potential prospect; subsequent Soil Gas and Head Gas surveys suggest hydrocarbon potential. In the final year of this project the principle contractor, the Fort Peck Tribes, completed a second survey in the Wicape 3D Seismic Prospect Area (also known as Area 6 in Phase I of the project) and sampled several Landsat image features contained in the Smoke Creek Aeromag Anomaly Area (also known as Area 1 in Phase II of the project). Methods determined to be most useful in Phases I and II, were employed in this final Phase III of the study. The Southwest Wicape seismic anomaly was only partially confirmed. The abundant curvilinears proposed to be possible hydrocarbon micro-seepage chimneys in the Smoke Creek Area were not conclusively verified as such. Insufficient sampling of background data precludes affirmative identification of these mostly topographic Landsat features as gas induced soil and vegetation anomalies. However relatively higher light gas concentrations were found associated with some of the curvilinears. Based on the findings of this work the Assiniboine & Sioux Tribes of the Fort Peck Reservation intend to utilize surface hydrocarbon

  16. Geothermal Direct Use Feasibility Study on the Fort Bidwell Indian Reservation

    SciTech Connect (OSTI)

    Dale Merrick

    2007-04-20

    The Fort Bidwell Indian Reservation (FBIR) is rich in renewable energy resources. Development of its geothermal resources has the potential to profoundly affect the energy and economic future of the FBIC. Geothermal energy can contribute to making the reservation energy self-sufficient and, potentially, an energy exporter. The feasibility study assessed the feasibility of installing a geothermal district heating system to provide low-cost, efficient heating of existing and planned residences, community buildings and water, using an existing geothermal well, FB-3.

  17. The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

    2013-09-30

    This study, sponsored by the U.S. General Services Administration’s Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

  18. Fort Devens: Cold Climate, Energy-Efficient, Market-Rate Townhomes

    SciTech Connect (OSTI)

    Zoeller, W.; Slattery, M.; Grab, J.

    2013-08-01

    In 2009, Mass Development issued an RFQ and subsequent RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A).

  19. St. Lucie County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hutchinson Island South, Florida Indian River Estates, Florida Lakewood Park, Florida Port St. Lucie, Florida Port St. Lucie-River Park, Florida St. Lucie Village, Florida White...

  20. St. Charles County, Missouri: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Missouri O'Fallon, Missouri Portage Des Sioux, Missouri St. Charles, Missouri St. Paul, Missouri St. Peters, Missouri Weldon Spring Heights, Missouri Weldon Spring, Missouri...

  1. Seeing Savings from an ESPC Project in Fort Polk's Utility Bills

    SciTech Connect (OSTI)

    Shonder, J.A.

    2005-03-08

    Federal agencies have implemented many energy efficiency projects over the years with direct funding or alternative financing vehicles such as energy savings performance contracts (ESPCs). While it is generally accepted that these projects save energy and costs, the savings are usually not obvious in the utility bills. This is true for many valid technical reasons, even when savings are verified in other ways to the highest degree of certainty. However, any perceived deficiency in the evidence for savings is problematic when auditors or other observers evaluate the outcome of energy projects and the achievements of energy management programs. This report discusses under what circumstances energy savings should or should not be evident in utility bills. In the special case of a large ESPC project at the Army's Fort Polk, the analysis of utility bills carried out by the authors does unequivocally confirm and quantify savings. The data requirements and methods for arriving at definitive answers through utility bill analysis are demonstrated in our discussion of the Fort Polk project. The following paragraphs address why the government generally should not expect to see savings from ESPC projects in their utility bills. We also review lessons learned and best practices for measurement and verification (M&V) that can assure best value for the government and are more practical, straightforward, and cost-effective than utility bill analysis.

  2. Fort Irwin integrated resource assessment. Volume 3: Sitewide Energy Project identification for buildings and facilities

    SciTech Connect (OSTI)

    Keller, J.M.; Dittmer, A.L.; Elliott, D.B.; McMordie, K.L.; Richman, E.E.; Stucky, D.J.; Wahlstrom, R.R.; Hadley, D.L.

    1995-02-01

    The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.

  3. Dust Plume Modeling from Ranges and Maneuver Areas on Fort Bliss and the White Sands Missile Range: Final Report

    SciTech Connect (OSTI)

    Chapman, Elaine G.; Barnard, James C.; Rutz, Frederick C.; Pekour, Mikhail S.; Rishel, Jeremy P.; Shaw, William J.

    2009-05-04

    The potential for air quality impacts from heavy mechanized vehicles operating on and between the unpaved main supply routes at Fort Bliss and White Sands Missile Range was investigated. This report details efforts by the staff of Pacific Northwest National Laboratory for the Fort Bliss Directorate of Environment in this investigation. Dust emission and dispersion from typical move-out activities occurring on the installations were simulated using the atmospheric modeling system DUSTRAN. Major assumptions associated with designing the modeling scenarios are summarized and results of simulations conducted under these assumptions are presented for four representative meteorological periods.

  4. Science in St. Louis - Dr. Christine Kirmaier | Photosynthetic Antenna

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Center in St. Louis - Dr. Christine Kirmaier Science in St. Louis - Dr. Christine Kirmaier

  5. Quality site seasonal report, Fort Devens Launderette, SFBP (Solar in Federal Buildings Program) 1751, December 1984 through June 1985

    SciTech Connect (OSTI)

    Logee, T.L.

    1987-10-15

    The active solar Domestic Hot Water (DHW) system at the Fort Devens Launderette was designed and constructed as part of the Solar in Federal Buildings Program (SFBP). This retrofitted system was one of eight systems selected for quality monitoring. The purpose of this monitoring effort was to document the performance of quality state-of-the-art solar systems in large federal buildings. The launderette is part of the Post Exchange complex at the Fort Devens Army Post in Fort Devens, Massachusetts. The solar system preheats hot water for the coin operated laundry which has an estimated 25,000 customers per year. There are 108 collector panels comprising the 2563-square foot collector array. Collected solar energy is stored in a 3800-gallon tank. Propylene glycol is used to protect the solar array from freezing. Two immersed heat exchangers provide heat transfer from the propylene glycol to directly heat the DHW supply water in the storage tank. Auxiliary energy is supplied by gas and oil boilers. This solar system can be considered one of a kind and as such is a prototype. The lessons learned from building and operating this system should be used to correct design deficiencies and improve the performance of future solar systems for this application. Highlights of the system performance at the Fort Devens Launderette solar system during the December 1984 through June 1985 monitoring period are presented in this report.

  6. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    SciTech Connect (OSTI)

    Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.; Kreyling, Sean J.; Schneider, Kevin P.

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  7. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  8. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  9. Fort Devens. Cold Climate, Energy-Efficient, Market-Rate Townhomes

    SciTech Connect (OSTI)

    Zoeller, William; Slattery, Matt; Grab, Joanna

    2013-08-01

    In 2009, Mass Development issued a RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A). This report describes the development of high performance, affordable, and replicable designs developed by the team in test homes and plans to move forward with the next buildings.

  10. The evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana: Final Report

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.

    1998-03-01

    This report documents an independent evaluation of an energy retrofit of 4,003 family housing units at Fort Polk, Louisiana, under an energy savings performance contract (ESPC). Replacement of the heating, cooling, and water heating systems in these housing units with geothermal heat pumps (GHPs) anchored the retrofit; low-flow shower heads and compact fluorescent lighting were also installed, as well as attic insulation where needed. Statistically valid findings indicate that the project will save 25.8 million kWh, or 32.5% of the pre-retrofit whole-community electrical consumption, and 100% of the whole-community natural gas previously used for space conditioning and water heating (260,000 therms) in a typical meteorological year. At the end-use level, the GHPs were found to save about 42% of the pre-retrofit electrical consumption for heating, cooling, and water heating in housing units that were all-electric in the pre-retrofit period. This report also demonstrates an improved method of predicting energy savings. Using an engineering model calibrated to pre-retrofit energy use data collected in the field, the method predicted actual energy savings on one of the electric feeders at Fort Polk with a very high degree of accuracy. The accuracy of this model was in turn dependent on data-calibrated models of the geothermal heat pump and ground heat exchanger that are described in this report. In addition this report documents the status of vertical borehole ground heat exchanger (BHEx) design methods at the time this project was designed, and demonstrates methods of using data collected from operating GHP systems to benchmark BHEx design methods against a detailed engineering model calibrated to date. The authors also discuss the ESPC`s structure and implementation and how the experience gained here can contribute to the success of future ESPCs.

  11. ST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety Monitoring Program) Meeting in China, December 9-14, 2009 Respectfully ... Rick Savercool and Keith Rule - U.S. JWG to China Reviewed by: Prof. Huang and Dr. ...

  12. Florida Nuclear Profile - St Lucie

    U.S. Energy Information Administration (EIA) Indexed Site

    St Lucie" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,839,"5,299",72.1,"PWR","application/vnd.ms-excel","application/vnd.ms-excel" 2,839,"7,331",99.7,"PWR","application/vnd.ms-excel","application/vnd.ms-excel"

  13. Pennsylvania's 1st congressional district: Energy Resources ...

    Open Energy Info (EERE)

    in Pennsylvania's 1st congressional district PECO Energy Co Retrieved from "http:en.openei.orgwindex.php?titlePennsylvania%27s1stcongressionaldistrict&oldid198299...

  14. California's 31st congressional district: Energy Resources |...

    Open Energy Info (EERE)

    in California's 31st congressional district Angeleno Group Retrieved from "http:en.openei.orgwindex.php?titleCalifornia%27s31stcongressionaldistrict&oldid181523...

  15. Connecticut's 1st congressional district: Energy Resources |...

    Open Energy Info (EERE)

    1st congressional district Aztech Engineers Connecticut Light and Power Infinity Fuel Cell and Hydrogen Inc LiquidPiston Inc Nxegen SmartPower United Technologies Corp...

  16. St. Paul Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    USA Biomass National Map Retrieved from "http:en.openei.orgwindex.php?titleSt.PaulBiomassFacility&oldid398161" Feedback Contact needs updating Image needs updating...

  17. Green St Energy | Open Energy Information

    Open Energy Info (EERE)

    Green St. Energy Place: Tehachapi, California Zip: 93561 Sector: Wind energy Product: California-based OTC-quoted wind energy project developer. Coordinates: 35.132245,...

  18. California's 21st congressional district: Energy Resources |...

    Open Energy Info (EERE)

    can help OpenEI by expanding it. This page represents a congressional district in California. Registered Energy Companies in California's 21st congressional district Agrimass...

  19. California's 41st congressional district: Energy Resources |...

    Open Energy Info (EERE)

    can help OpenEI by expanding it. This page represents a congressional district in California. Registered Energy Companies in California's 41st congressional district BCL...

  20. Mount St. Mary's Abbey | Open Energy Information

    Open Energy Info (EERE)

    Energy Developments Energy Purchaser Mount St. Mary's Abbey Location Wrentham MA Coordinates 42.033096, -71.393711 Show Map Loading map... "minzoom":false,"mappings...

  1. City of St. George- Net Metering

    Broader source: Energy.gov [DOE]

    The City of St. George Energy Services Department (SGESD) offers a net metering program to its customers, and updated program guidelines and fees in September 2015.* 

  2. Evaluation of FSV-1 cask for the transport of LWR irradiated fuel assemblies

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    The Model FSV-1 spent fuel shipping cask was designed by General Atomic Company (GA) to service the Fort St. Vrain (FSV) nuclear generating station, a High Temperature Gas Reactor (HTGR) owned and operated by Public Service Company of Colorado (PSC). This report presents an evaluation of the suitability of the FSV-1 cask for the transport of irradiated Light Water Reactor (LWR) fuel assemblies from both Pressurized Water Reactors (PWR) and Boiling Water Reactors (BWR). The FSV-1 cask evaluation parameters covered a wide spectrum of LWR fuel assemblies, based on burnup in Megawatt Days/Metric Ton of Heavy Metal (MWD/MTHM) and years of decay since irradiation. The criteria for suitability included allowable radiation dose rates, cask surface and interior temperatures and the Gross Vehicle Weight (GVW) of the complete shipping system.

  3. Medium-size high-temperature gas-cooled reactor

    SciTech Connect (OSTI)

    Peinado, C.O.; Koutz, S.L.

    1980-08-01

    This report summarizes high-temperature gas-cooled reactor (HTGR) experience for the 40-MW(e) Peach Bottom Nuclear Generating Station of Philadelphia Electric Company and the 330-MW(e) Fort St. Vrain Nuclear Generating Station of the Public Service Company of Colorado. Both reactors are graphite moderated and helium cooled, operating at approx. 760/sup 0/C (1400/sup 0/F) and using the uranium/thorium fuel cycle. The plants have demonstrated the inherent safety characteristics, the low activation of components, and the high efficiency associated with the HTGR concept. This experience has been translated into the conceptual design of a medium-sized 1170-MW(t) HTGR for generation of 450 MW of electric power. The concept incorporates inherent HTGR safety characteristics (a multiply redundant prestressed concrete reactor vessel (PCRV), a graphite core, and an inert single-phase coolant) and engineered safety features (core auxiliary cooling, relief valve, and steam generator dump systems).

  4. Relationships between strength, electrical conductivity, and density for oxidized PGX graphite

    SciTech Connect (OSTI)

    Morgan, W.C.; Prince, J.M.

    1983-07-01

    The core of a High Temperature Gas-Cooled Reactor (HTGR) rests on massive graphite core support blocks; which, in turn, are supported by core support posts. PGX graphite was used for the core support blocks of the Fort St. Vrain HTGR (the only operating HTGR); and, evidently, is the leading candidate material for use in advanced HTGRs. Therefore, PGX was chosen for the initial tests on the use of eddy current techniques to monitor strength changes as a result of oxidation. The results of these initial tests showed that both compressive strength and electrical conductivity correlated very well with density. However, only a single log of PGX was used for the initial tests; therefore, it was necessary to determine if the correlations could be extended to other logs of PGX.

  5. Core fluctuations test. Revision 1

    SciTech Connect (OSTI)

    Betts, W.S.

    1987-06-01

    Fluctuations were first encountered in the Fort St. Vrain reactor early in cycle 1 operation, during the initial rise from 40% to 70% power. Subsequent in-core tests and operation throughout cycles 1 and 2 demonstrated that fluctuations were repeatable, occurring at core pressure drops of between 2.5 psi and 4.0 psi, and that in each instance their characteristics were very similar. Subsequently, tests and analysis were done to understand the core fluctuation phenomenon. These efforts also lead to a design fix which stopped these fluctuations in the FSV reactor core. This fix required that keys be used in addition to the keys in the core support floor which already existed. This report outlines a test plan to validate that core fluctuations will not occur in the MHTGR core. 2 refs., 12 figs., 3 tabs.

  6. Basewide energy systems plan for Fort Bragg, North Carolina. Facilities engineer conservation measures. Executive summary. Final report

    SciTech Connect (OSTI)

    1984-10-01

    This report presents the results of Increments A, B, C, D, E, F, and G of the Energy Engineering Analysis Program, as well as the energy audit of Womack Hospital, conducted at Fort Bragg in Fayetteville, North Carolina, by JRB Associates under Contract No. DACA2l-80-C-00l4. This report includes analyses of the energy patterns at the facility, and the identification and evaluation of energy conservation opportunities. The results obtained indicate that energy use at Fort Bragg will remain constant through FY 1985, compared to FY 1975 energy use. This will be achieved even though the total square feet of conditioned space is projected to increase by 14 percent. This report is organized into eight volumes, plus appendices.

  7. Regional analysis of rhythmic bedding in the Fort Hays limestone member, Niobrara Formation (Upper Cretaceous), US western interior

    SciTech Connect (OSTI)

    Laferriere, A.P.

    1987-01-01

    Results of a regional stratigraphic investigation of the rhythmically bedded Fort Hays limestone member of Kansas, Colorado, and New Mexico indicate at least two levels of cyclicity. Regional development of these cycles strongly supports the hypothesis that they are climatic in origin. Departures from simple cyclical patterns resulted from sedimentary effects of Late Cretaceous orogenic activity, erosional events associated with eustatic sea level changes, diagenetic modification, and possibly from interference between orbital parameters having different periodicities. The vulnerability of Milankovitch-type cyclicity to overprinting by tectono-sedimentologic effects makes units such as the Fort Hays useful as indicators of subtle tectonic activity. Regional thickness changes in groups of shale-limestone couplets were identified, correlated, and mapped in the subsurface using geophysical well log information in order to locate subtle structural elements that influenced Fort Hays sedimentation. In the Denver-Julesburg Basin of Colorado and western Kansas, thinning of the section between Fort Hays marker horizons occurs dominantly along northeastwardly trending belts that resulted apparently from Late Cretaceous reactivation of the Transcontinental Arch. Isotopic and petrographic analyses were conducted on pelagic (carbonate matrix) and benthic (inoceramid bivalve) constituents of selected shale/limestone couplets. These data suggest that there was little difference in temperature or salinity between times of terrigenous detrital input and times of nearly pure carbonate deposition. Isotopic information from matrix samples suggests a westward decrease in salinity of surface water in the Western Interior Sea. Isotopic data from largely unaltered inoceramid bivalves indicate bottom-water conditions of near-normal marine salinity.

  8. Options for treating high-temperature gas-cooled reactor fuel for repository disposal

    SciTech Connect (OSTI)

    Lotts, A.L.; Bond, W.D.; Forsberg, C.W.; Glass, R.W.; Harrington, F.E.; Micheals, G.E.; Notz, K.J.; Wymer, R.G.

    1992-02-01

    This report describes the options that can reasonably be considered for disposal of high-temperature gas-cooled reactor (HTGR) fuel in a repository. The options include whole-block disposal, disposal with removal of graphite (either mechanically or by burning), and reprocessing of spent fuel to separate the fuel and fission products. The report summarizes what is known about the options without extensively projecting or analyzing actual performance of waste forms in a repository. The report also summarizes the processes involved in convert spent HTGR fuel into the various waste forms and projects relative schedules and costs for deployment of the various options. Fort St. Vrain Reactor fuel, which utilizes highly-enriched {sup 235}U (plus thorium) and is contained in a prismatic graphite block geometry, was used as the baseline for evaluation, but the major conclusions would not be significantly different for low- or medium-enriched {sup 235}U (without thorium) or for the German pebble-bed fuel. Future US HTGRs will be based on the Fort St. Vrain (FSV) fuel form. The whole block appears to be a satisfactory waste form for disposal in a repository and may perform better than light-water reactor (LWR) spent fuel. From the standpoint of process cost and schedule (not considering repository cost or value of fuel that might be recycled), the options are ranked as follows in order of increased cost and longer schedule to perform the option: (1) whole block, (2a) physical separation, (2b) chemical separation, and (3) complete chemical processing.

  9. Electrical Energy and Demand Savings from a Geothermal Heat Pump ESPC at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. Pre- and post-retrofit data were taken at 15-minute intervals on energy flows through the electrical distribution feeders that serve the family housing areas of the post. Fifteen-minute interval data were also taken on energy use from a sample of the residences. The analysis presented in this paper shows that for a typical meteorological year, the retrofits result in an electrical energy savings of approximately 25.6 million kWh, or 32.4% of the pre-retrofit electrical use in family housing. Peak electrical demand has also been reduced by about 6.8 MW, which is 40% of pre-retrofit peak demand. In addition, the retrofits save about 260,000 therms per year of natural gas. It should be noted that the energy savings presented in this document are the 'apparent' energy savings observed in the monitored data and are not to be mistaken for the 'contracted' energy savings used as the basis for payments. To determine the 'contracted' energy savings, the 'apparent' energy savings may require adjustments for such things as changes in indoor temperature performance criteri, addition of ceiling fans, and other factors.

  10. Isotopic Analysis At Mt St Helens Area (Shevenell & Goff, 2000...

    Open Energy Info (EERE)

    Home Exploration Activity: Isotopic Analysis At Mt St Helens Area (Shevenell & Goff, 2000) Exploration Activity Details Location Mt St Helens Area Exploration Technique...

  11. Compound and Elemental Analysis At Mt St Helens Area (Shevenell...

    Open Energy Info (EERE)

    Exploration Activity: Compound and Elemental Analysis At Mt St Helens Area (Shevenell & Goff, 2000) Exploration Activity Details Location Mt St Helens Area Exploration Technique...

  12. Geothermometry At Mt St Helens Area (Shevenell & Goff, 1995)...

    Open Energy Info (EERE)

    St Helens Area (Shevenell & Goff, 1995) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Mt St Helens Area (Shevenell & Goff,...

  13. Isotopic Analysis At Mt St Helens Area (Shevenell & Goff, 1995...

    Open Energy Info (EERE)

    Home Exploration Activity: Isotopic Analysis At Mt St Helens Area (Shevenell & Goff, 1995) Exploration Activity Details Location Mt St Helens Area Exploration Technique...

  14. Compound and Elemental Analysis At Mt St Helens Area (Shevenell...

    Open Energy Info (EERE)

    Exploration Activity: Compound and Elemental Analysis At Mt St Helens Area (Shevenell & Goff, 1995) Exploration Activity Details Location Mt St Helens Area Exploration Technique...

  15. Hawaii's 1st congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Hawaii. Registered Networking Organizations in Hawaii's 1st congressional district Hawaii Public Utilities Commission Registered Energy Companies in Hawaii's 1st congressional...

  16. East Grand St Bridge Snowmelt Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East...

  17. Arkansas's 1st congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Act Smart Grid Projects in Arkansas's 1st congressional district Woodruff Electric Smart Grid Project Utility Companies in Arkansas's 1st congressional district City Water...

  18. Michigan's 1st congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Registered Energy Companies in Michigan's 1st congressional district AG Solutions Inc Dow Chemical Co Dow Kokam Energy Generation Facilities in Michigan's 1st congressional...

  19. Washington University in St Louis | Open Energy Information

    Open Energy Info (EERE)

    in St Louis Jump to: navigation, search Name: Washington University in St Louis Place: Missouri Product: University with large research departments, particularly medical....

  20. St. Mary's Hospital Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Hospital Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name St. Mary's Hospital Space Heating Low Temperature Geothermal Facility Facility St....

  1. Virginia's 1st congressional district: Energy Resources | Open...

    Open Energy Info (EERE)

    Virginia's 1st congressional district Delta T Corporation E85 Inc Virginia Biodiesel Refinery Utility Companies in Virginia's 1st congressional district Rappahannock Electric Coop...

  2. 21st century Green Solutions LLC | Open Energy Information

    Open Energy Info (EERE)

    21st century Green Solutions LLC Jump to: navigation, search Name: 21st century Green Solutions, LLC Place: Grand Blanc, Michigan Zip: 48439 Sector: Wind energy Product: Exclusive...

  3. St. James Parish, Louisiana: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Energy Generation Facilities in St. James Parish, Louisiana IMC Phosphates Company Uncle Sam Biomass Facility Places in St. James Parish, Louisiana Gramercy, Louisiana Lutcher,...

  4. St. Charles Parish, Louisiana: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Louisiana Montz, Louisiana New Sarpy, Louisiana Norco, Louisiana Paradis, Louisiana St. Rose, Louisiana Taft, Louisiana Retrieved from "http:en.openei.orgwindex.php?titleSt.C...

  5. Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings This case study describes how the Boise Inc. ...

  6. St. Clair County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in St. Clair County, Illinois DarkStar VI Mid America Advanced Power Solutions Midwest Biodiesel Products Energy Generation Facilities in St. Clair County, Illinois Milam Gas...

  7. Using SDI-12 with ST microelectronics MCU's

    SciTech Connect (OSTI)

    Saari, Alexandra; Hinzey, Shawn Adrian; Frigo, Janette Rose; Proicou, Michael Chris; Borges, Louis

    2015-09-03

    ST Microelectronics microcontrollers and processors are readily available, capable and economical processors. Unfortunately they lack a broad user base like similar offerings from Texas Instrument, Atmel, or Microchip. All of these devices could be useful in economical devices for remote sensing applications used with environmental sensing. With the increased need for environmental studies, and limited budgets, flexibility in hardware is very important. To that end, and in an effort to increase open support of ST devices, I am sharing my teams' experience in interfacing a common environmental sensor communication protocol (SDI-12) with ST devices.

  8. Limited site investigation of Landfills 1 and 4, Fort Lewis, Washington

    SciTech Connect (OSTI)

    Last, G.V.; Eddy, P.A.; Airhart, S.P.; Olsen, K.R.; Raymond, J.R.; Dahl, D.R.

    1990-08-01

    The information presented in this report was collected during limited site investigation activities conducted in the vicinity of Landfills 1 and 4 at Fort Lewis. The purpose of this work was to provide a means of detecting and evaluating the impacts of these inactive landfills on ground-water quality and adjacent lands. This effort included the design and construction of ground-water monitoring systems for compliance with applicable federal and state regulations governing Resource Conservation and Recovery Act (RCRA)-type landfills. Ground-water samples were collected from both existing (1981 and 1984) wells and the newly installed (1988) wells. The analytical results from the water samples indicate that the ground water in and around Landfill 1 contains limited contamination. Contaminants may include volatile organic compounds and nitrate. The primary concern in the area around Landfill 1 was the determination that ground water from two wells may contain cis-1,2-dichloroethylene and 1,1,1-trichloroethylene above drinking water standards. Nitrate levels in the downgradient wells were greater than those in upgradient wells and exceeded drinking water standards in some of the less-representative samples. Analyses of ground-water samples from wells in and around Landfill 4 indicate several contaminants may be present. These include volatile organic compounds (principally cis-1,2-dichloroethylene and 1,1,1-trichloroethylene), coliform, oil and grease, and perhaps some metals (iron and magnesium). The primary concern in the area around Landfill 4 was the determination that ground water from five wells contained cis-1,2-dichloroethylene and 1,1,1-trichloroethylene above drinking water standards. The source of contaminants beneath either landfill cannot yet be identified. Insufficient data exist to disprove or confirm either landfill as possible contributors. 19 refs., 32 figs., 17 tabs.

  9. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army Project 181 Implementation Challenges in Deployment of an Energy Security Microgrid for Army Reserve Facilities located on the Former Fort Devens Army Base

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30

    This documents reports on a request for technical assistance from Fort Devens to analyze procurement of energy from nearby renewable generating resources.

  10. SL/ST Performance Management Training

    Broader source: Energy.gov [DOE]

    The training provides an overview of DOE's SL/ST appraisal system, as well as describes key actions within all of the major phases of the annual performance management cycle. The guidance/training...