Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Fort Bend County, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bend County, Texas: Energy Resources Bend County, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 29.5692614°, -95.8142885° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.5692614,"lon":-95.8142885,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

2

Gravity survey of the Cove Fort-Sulphurdale KGRA and the north Mineral Mountains area, Millard and Beaver Counties, Utah  

DOE Green Energy (OSTI)

During the summers of 1975 and 1976, a gravity survey was conducted in the Cove Fort-Sulphurdale KGRA and north Mineral Mountains area, Millard and Beaver Counties, Utah. The survey consisted of 671 gravity stations covering an area of about 1300 km{sup 2}, and included two orthogonal gravity profiles traversing the area. The gravity data are presented as a terrain-corrected Bouguer gravity anomaly map with a contour interval of 1 mgal and as an isometric three-dimensional gravity anomaly surface. Selected anomaly separation techniques were applied to the hand-digitized gravity data (at 1-km intervals on the Universal Transverse Mercator grid) in both the frequency and space domains, including Fourier decomposition, second vertical derivative, strike-filter, and polynomial fitting analysis, respectively.

Brumbaugh, W.D.; Cook, K.L.

1977-08-01T23:59:59.000Z

3

Study of well logs from Cove Fort-Sulphurdale KGRA, Millard and Beaver Counties, Utah  

DOE Green Energy (OSTI)

Union Oil Company drilled four geothermal test wells in the Cove Fort-Sulphurdale KGRA between 1975 and 1979. A fairly complete suite of well logs were recorded for the three deeper holes, and these data are presented as composite well log plots in this report. The composite well log plots have facilitated the interpretation of limestone, dolomite, sandstone, quartz-monzonite, serpentine, and volcanic lithologies and the identification of numerous fractures. This has been especially helpful because of the extensive lost circulaton zones and poor cuttings recovery. Intraformational flow was identified by a fluid migration-temperature tracer log at depth in CFSU 31-33. Well log crossplots were computed to assist in lithologic identification and the determination of physical properties for specific depth intervals in a given hole. The presence of hydrous minerals sometimes results in neutron porosity somewhat higher than the true nonfracture porosity, which is generally less than 4%. Permeability is clearly controlled by fractures. A maximum well temperature of 178.9/sup 0/C, low flow rates and low probable percent flash indicate these wells are subeconomic for electric generation at present. The well log study has substantially improved our understanding of the reservoir as presently drilled.

Glenn, W.E.; Ross, H.P.

1982-07-01T23:59:59.000Z

4

Developing an exploration model by investigating the geological controls on reservoir production within the Fort Scott limestone, Ness county, Kansas.  

E-Print Network (OSTI)

??Ness County, Kansas is situated along the western flank of the Central Kansas uplift, and has been an active center of oil exploration since the (more)

Flenthrope, Christopher

2009-01-01T23:59:59.000Z

5

Superfund record of decision (EPA Region 1): Fort Devens Sudbury Training Annex, source control operable unit, Middlesex County, MA, September 29, 1995  

Science Conference Proceedings (OSTI)

This Record of Decision (ROD) document presents the selected source control (SC) remedial action at areas of contamination (AOCs) A7 and A9 at the Fort Devens Sudbury Training Annex (Annex), Middlesex County, Massachusetts. The major components of the selected remedy for AOCs A7 and A9 include: Excavation and off-site treatment and disposal of laboratory waste at AOC A7; Excavation of contaminated soil from AOC A9 and consolidation at AOC A7; Consolidation of contaminated soil and solid waste at AOC A7 to within the limits of the landfill cap; Construction of a Resource Conservation and Recovery Act (RCRA) Subtitle C landfill cap at AOC A7; Environmental monitoring and operation and maintenance (O&M) at AOC A7; Institutional controls at AOC A7 to limit future site use and to restrict site access; and Five-year reviews at AOC A7.

NONE

1996-03-01T23:59:59.000Z

6

Gravity survey of the Cove Fort-Sulphurdale KGRA and the North Mineral Mountains area, Millard and Beaver Counties, Utah. Technical report: Volume 77-4  

DOE Green Energy (OSTI)

During the summers of 1975 and 1976, a gravity survey was conducted in the Cove Fort-Sulphurdale KGRA and north Mineral Mountains area, Millard and Beaver Counties, Utah. The survey consisted of 671 gravity stations covering an area of about 1300 km/sup 2/, and included two orthogonal gravity profiles traversing the area. The gravity data are presented as a terrain-corrected Bouguer gravity anomaly map with a contour interval of 1 mgal and as an isometric three-dimensional gravity anomaly surface. Selected anomaly separation techniques were applied to the hand-digitized gravity data (at 1-km intervals on the Universal Transverse Mercator grid) in both the frequency and space domains, including Fourier decomposition, second vertical derivative, strike-filter, and polynomial fitting analysis, respectively.

Brumbaugh, W.D.; Cook, K.L.

1977-08-01T23:59:59.000Z

7

Multielement geochemical exploration data for the Cove Fort-Sulphurdale Known Geothermal Resource Area, Beaver and Millard counties, Utah  

DOE Green Energy (OSTI)

Multielement geochemical exploration data have been acquired for the Cove Fort-Sulphurdale Known Geothermal Resource Area (KGRA). This was accomplished by analysis of both whole rock and +3.3 specific gravity concentrate samples from cuttings composites collected from shallow rotary drill holes. Areal distributions are reported for arsenic, mercury, lead and zinc. These are elements indicated by previous studies to be broadly zoned around thermal centers in geothermal systems and thus to be useful for selecting and prioritizing drilling targets. Results from this work suggest that reservoir temperature and/or reservoir to surface permeability, and thus possibly overall potential for a geothermal resource, increase northward beneath the approximately 18 square mile area containing shallow drill holes, possibly to beyond the northern limits of the area. The data provide a basis for development of three principal target models for the geothermal system but do not permit prioritization of these models. It is recommended that geochemical, geological, and temperature gradient surveys be expanded northward from the present survey area to more fully define the area which appears to have the best resource potential and to aid prioritization of the target models.

Bamford, R.W.; Christensen, O.D.

1979-09-01T23:59:59.000Z

8

Detailed gravity and aeromagnetic surveys of the Cove Fort-Sulphurdale KGRA and vicinity, Millard and Beaver Counties, Utah. Topical report  

DOE Green Energy (OSTI)

A detailed gravity survey (comprising 231 stations over about 900 km/sup 2/) was made in the Cove Fort-Sulphurdale Known Geothermal Resource area (KGRA) and vicinity, Millard and Beaver counties, Utah to assist in the appraisal of the potential of this area as a geothermal resource. The survey reinforced the results and information obtained in the previous regional gravity surveys comprising 522 stations. The gravity data from about 700 stations were reduced and compiled as a terrain-corrected (out to 20 km) Bouguer gravity anomaly map with 1-mgal contour interval. In August 1975, an aeromagnetic survey was flown over part of the survey area at a constant barometric elevation of 12,000 ft (3660 m). These aeromagnetic data are used to supplement the interpretation of the gravity data. The aeromagnetic field intensity residual anomaly map and the second-order polynomial residual aeromagnetic map (obtained by removing a second-order polynomial surface) are presented with a 20-gamma contour interval. Two north-south profiles and one east-west profile were selected for magnetic interpretative modeling. The two north-south profiles were also stacked and averaged over 6-km-wide strips and modeled. The occurrences of hydrothermal alteration, hot spring deposits, and flowing hot springs coincide with inferred fault zones. No evidence of extensive alteration can be interpreted from the magnetic data.

Cook, K.L.; Serpa, L.F.; Pe, W.

1980-01-01T23:59:59.000Z

9

Fort Loramie, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

County, Ohio. It falls under Ohio's 4th congressional district.12 Registered Energy Companies in Fort Loramie, Ohio LP Hoying, LLC References US Census Bureau...

10

County  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pine County Pine County White Pine County Board of County Commissioners Board of County Commissioners February 10, 1998 W. Eric J. Fygi U.S. Department of Energy Office of General Counsel GC-52 1000 Independence Avenue SW Washington, DC 20585 Subject: Department of Energy (DOE) Price-Anderson Act Comments from White Pine County, Nevada Dear Mr. Fygi: Thank you for providing White Pine County with the opportunity to comment concerning the continuation or modifications of the provisions of the Price-Anderson Act. We understand that these comments will be used to assist the Department of Energy in preparing a required report to Congress. You will note in reviewing our comments that the views of many "Affected Units of Government" in Nevada are similar to each other and that we have worked together in developing

11

COUNTY\  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BOARD OF COUNTY COMMISSIONERS BOARD OF COUNTY COMMISSIONERS ESMERALDA COUNTY, NEVADA MEMBERS STAFF SUSAN W. DUDLEY, CHAIRMAN BEVERLY J. RELYEA GARY O'CONNOR, VICE CHAIRMAN ADMINISTRATIVE ASSISTANT BEN VILJOEN, LIQUOR BOARD (702)485-3406 January 20, 1998 U.S. Department of Energy Office of General Counsel GCS-52 1000 Independence Ave. SW Washington, DC 20585 RE: COMMENT BY ESMERALDA COUNTY, NEVADA CONCERNING THE CONTINUATION OR MODIFICATION OF DOE PRICE-ANDERSON ACT Dear Sirs: The DOE Price-Anderson indemnification is intended to provide coverage for contractors for the benefit of any victims of a nuclear accident or incident or a precautionary evacuation arising from activity under a DOE contracts. The public perception is that if there is a nuclear accident resulting in a dispersal of

12

DOE - Office of Legacy Management -- Fort St Vrain - 011  

Office of Legacy Management (LM)

Fort St Vrain - 011 Fort St Vrain - 011 FUSRAP Considered Sites Site: Fort St Vrain (011) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Fort St. Vrain Independent Spent Fuel Storage Installation is located in Weld County, Colorado. In 1965, the U.S. Atomic Energy (a predecessor agency to DOE) agreed to provide permanent storage for a large portion of the Fort St. Vrain¿s spent nuclear fuel. Originally, Fort St. Vrain was a nuclear power generating facility that operated from 1976 to 1989. In 1989, the nuclear power plant was decommissioned and the plant was converted to a natural gas power plant.

13

FORT UNION DEEP  

Science Conference Proceedings (OSTI)

Coalbed methane (CBM) is currently the hottest area of energy development in the Rocky Mountain area. The Powder River Basin (PRB) is the largest CBM area in Wyoming and has attracted the majority of the attention because of its high permeability and relatively shallow depth. Other Wyoming coal regions are also being targeted for development, but most of these areas have lower permeability and deeper coal seams. This project consists of the development of a CBM stimulation system for deep coal resources and involves three work areas: (1) Well Placement, (2) Well Stimulation, and (3) Production Monitoring and Evaluation. The focus of this project is the Washakie Basin. Timberline Energy, Inc., the cosponsor, has a project area in southern Carbon County, Wyoming, and northern Moffat County, Colorado. The target coal is found near the top of the lower Fort Union formation. The well for this project, Evans No.1, was drilled to a depth of 2,700 ft. Three coal seams were encountered with sandstone and some interbedded shale between seams. Well logs indicated that the coal seams and the sandstone contained gas. For the testing, the upper seam at 2,000 ft was selected. The well, drilled and completed for this project, produced very little water and only occasional burps of methane. To enhance the well, a mild severity fracture was conducted to fracture the coal seam and not the adjacent sandstone. Fracturing data indicated a fracture half-length of 34 ft, a coal permeability of 0.2226 md, and permeability of 15.3 md. Following fracturing, the gas production rate stabilized at 10 Mscf/day within water production of 18 bpd. The Western Research Institute (WRI) CBM model was used to design a 14-day stimulation cycle followed by a 30-day production period. A maximum injection pressure of 1,200 psig to remain well below the fracture pressure was selected. Model predictions were 20 Mscf/day of air injection for 14 days, a one-day shut-in, then flowback. The predicted flowback was a four-fold increase over the prestimulation rate with production essentially returning to prestimulation rates after 30 days. The physical stimulation was conducted over a 14-day period. Problems with the stimulation injection resulted in a coal bed fire that was quickly quenched when production was resumed. The poststimulation, stabilized production was three to four times the prestimulation rate. The methane content was approximately 45% after one day and increased to 65% at the end of 30 days. The gas production rate was still two and one-half times the prestimulation rate at the end of the 30-day test period. The field results were a good match to the numerical simulator predictions. The physical stimulation did increase the production, but did not produce a commercial rate.

Lyle A. Johnson Jr.

2002-09-01T23:59:59.000Z

14

FORT UNION DEEP  

Science Conference Proceedings (OSTI)

Coalbed methane (CBM) is currently the hottest area of energy development in the Rocky Mountain area. The Powder River Basin (PRB) is the largest CBM area in Wyoming and has attracted the majority of the attention because of its high permeability and relatively shallow depth. Other Wyoming coal regions are also being targeted for development, but most of these areas have lower permeability and deeper coal seams. This project consists of the development of a CBM stimulation system for deep coal resources and involves three work areas: (1) Well Placement, (2) Well Stimulation, and (3) Production Monitoring and Evaluation. The focus of this project is the Washakie Basin. Timberline Energy, Inc., the cosponsor, has a project area in southern Carbon County, Wyoming, and northern Moffat County, Colorado. The target coal is found near the top of the lower Fort Union formation. The well for this project, Evans No.1, was drilled to a depth of 2,700 ft. Three coal seams were encountered with sandstone and some interbedded shale between seams. Well logs indicated that the coal seams and the sandstone contained gas. For the testing, the upper seam at 2,000 ft was selected. The well, drilled and completed for this project, produced very little water and only occasional burps of methane. To enhance the well, a mild severity fracture was conducted to fracture the coal seam and not the adjacent sandstone. Fracturing data indicated a fracture half-length of 34 ft, a coal permeability of 0.2226 md, and permeability of 15.3 md. Following fracturing, the gas production rate stabilized at 10 Mscf/day within water production of 18 bpd. The Western Research Institute (WRI) CBM model was used to design a 14-day stimulation cycle followed by a 30-day production period. A maximum injection pressure of 1,200 psig to remain well below the fracture pressure was selected. Model predictions were 20 Mscf/day of air injection for 14 days, a one-day shut-in, then flowback. The predicted flowback was a four-fold increase over the prestimulation rate with production essentially returning to prestimulation rates after 30 days. The physical stimulation was conducted over a 14-day period. Problems with the stimulation injection resulted in a coal bed fire that was quickly quenched when production was resumed. The poststimulation, stabilized production was three to four times the prestimulation rate. The methane content was approximately 45% after one day and increased to 65% at the end of 30 days. The gas production rate was still two and one-half times the prestimulation rate at the end of the 30-day test period. The field results were a good match to the numerical simulator predictions. The physical stimulation did increase the production, but did not produce a commercial rate.

Lyle A. Johnson Jr.

2002-03-01T23:59:59.000Z

15

Revised History of Fort Watauga.  

E-Print Network (OSTI)

??The history of the Revolutionary War Fort Watauga located in present day Elizabethton, TN has yet to be completed. The critique of several Tennessee historians (more)

Compton, Brian Patrick

2005-01-01T23:59:59.000Z

16

Nebraska Nuclear Profile - Fort Calhoun  

U.S. Energy Information Administration (EIA) Indexed Site

Fort Calhoun" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

17

Fort Fairfield Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Up Search Page Edit with form History Facebook icon Twitter icon Fort Fairfield Biomass Facility Jump to: navigation, search Name Fort Fairfield Biomass Facility Facility...

18

Fort Carson Wind Resource Assessment  

DOE Green Energy (OSTI)

This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

Robichaud, R.

2012-10-01T23:59:59.000Z

19

Coos County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bay, Oregon Coquille, Oregon Lakeside, Oregon Myrtle Point, Oregon North Bend, Oregon Powers, Oregon Retrieved from "http:en.openei.orgwindex.php?titleCoosCounty,Oregon&old...

20

Boralex Fort Fairfield Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Biomass Facility Biomass Facility Jump to: navigation, search Name Boralex Fort Fairfield Biomass Facility Facility Boralex Fort Fairfield Sector Biomass Location Aroostook County, Maine Coordinates 46.819941°, -68.4766064° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.819941,"lon":-68.4766064,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Fort Sill Tribal Energy Plan  

SciTech Connect

The Fort Sill Apache Tribe of Oklahoma has concluded an energy project funded through the First Steps Toward Developing Renewable Energy & Energy Efficiency program provided by the Department of Energy. The intent of the project was to include the establishment of a tribal Energy Office, an energy audit of tribal facilities, and a Strategic Energy Plan.

Shamieka Ross

2006-06-26T23:59:59.000Z

22

Fort Drum integrated resource assessment  

Science Conference Proceedings (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

23

Fort Pierce Utilities Authority - Solar Water Heating Rebate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fort Pierce Utilities Authority - Solar Water Heating Rebate (Florida) Fort Pierce Utilities Authority - Solar Water Heating Rebate (Florida) < Back Eligibility Residential Savings...

24

NREL: Department of Defense Energy Programs - Fort Carson  

NLE Websites -- All DOE Office Websites (Extended Search)

Fort Carson NREL is helping Fort Carson, Colorado, meet its net zero energy, water, and waste by 2020 goal by conducting technology demonstrations and providing support for...

25

Geothermometry At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Geothermometry At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Fort Bliss Area (DOE GTP)...

26

Thermochronometry At Fort Bliss Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Thermochronometry At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Thermochronometry Activity Date Usefulness not indicated...

27

counties - Counties Data | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

- Counties Data Counties Data Apps Challenges Policies Counties You are here Data.gov Communities Counties Counties Data This page features datasets from participating...

28

Barnett shale rising star in Fort Worth basin  

Science Conference Proceedings (OSTI)

The Mississippian-age Barnett shale of the Fort Worth basin, North Texas, has emerged as a new and active natural gas play. Natural gas production from the Barnett shale at Newark East field in Denton and Wise counties, Texas, has reached 80 MMcfd from more than 300 wells. However, very little publicly available information exists on resource potential and actual well performance. The US Geological Survey 1995 National Assessment of US Oil and Gas Resources categorized the Mississippian Barnett shale play (play number 4503) as an unconventional gas play but did not quantitatively assess this resource. This article, which expands upon a recent USGS open-file resource assessment report, provides an updated look at the Barnett shale and sets forth a new quantitative assessment for the play.

Kuuskraa, V.A.; Koperna, G. [Advanced Resources International Inc., Arlington, VA (United States); Schmoker, J.W.; Quinn, J.C. [Geological Survey, Denver, CO (United States)

1998-05-25T23:59:59.000Z

29

U.S. Army Fort Carson Photovoltaics Project Lease  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DACA45-1-07-6037 DACA45-1-07-6037 DEPARTMENT OF THE ARMY LEASE FORT CARSON MILITARY INSTALLATION EL PAS0 COUNTY, COLORADO THIS LEASE, made on behalf of the United States, between the SECRETARY OF THE ARMY, hereinafter referred to as the Secretary, and Carson Solar I, LLC., a limited liability company organized and existing under and by virtue of the laws of the State of Delaware, with its principal office at 31 897 Del Obispo, Suite 220, San Juan Capistrano, CA 92675, hereinafter referred to as the Lessee. WITNESSETH: The Secretary, by the authority of Title 10, United States Code, Section 2667, and for the consideration hereinafter set forth, hereby leases to the Lessee the property over, across, in and upon lands of the United States, identified in Exhibits "A" and "B," attached hereto and made a

30

U.S. Army Fort Carson Photovoltaics Project Lease  

Energy.gov (U.S. Department of Energy (DOE))

Document describes the project lease issued for the Fort Carson photovoltaic (PV) power purchase agreement (PPA).

31

Fort Bliss Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Fort Bliss Geothermal Area Fort Bliss Geothermal Area (Redirected from Fort Bliss Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fort Bliss Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (22) 10 References Area Overview Geothermal Area Profile Location: Texas Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

32

Water Reclamation and Reuse at Fort Carson  

NLE Websites -- All DOE Office Websites (Extended Search)

Fort Carson has built a successful and Fort Carson has built a successful and award-winning water conservation program through a series of initiatives that avoid using potable water. The program involves an innovative approach to utilizing alter- native sources of water, water reclamation, and recycling. Fort Carson is located near Colorado Springs, Colorado, and together with the Piñon Canyon Maneuver Site, occupies 373,000 acres. The army base has more than 9 million square feet of facility space-buildings that serve the army base-and an additional 4 million square feet of private family housing. Fort Carson serves as a training facility for the U.S. Army Special Forces, an infantry division, and Army Reserves. The base hosts more than 45,000 military personnel annu- ally. Approximately 20,000 civilians and military personnel

33

Water Reclamation and Reuse at Fort Carson  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Army's Fort Carson has built a successful and Army's Fort Carson has built a successful and award-winning water conservation program through a series of initiatives that avoid using potable water. The program involves an innovative approach to utilizing alter- native sources of water, water reclamation, and recycling. Fort Carson is located near Colorado Springs, Colorado, and together with the Piñon Canyon Maneuver Site, occupies 373,000 acres. The army base has more than 9 million square feet of facility space-buildings that serve the army base-and an additional 4 million square feet of private family housing. Fort Carson serves as a training facility for the U.S. Army Special Forces, an infantry division, and Army Reserves. The base hosts more than 45,000 military personnel annu- ally. Approximately 20,000 civilians and military personnel

34

Renewable Energy Opportunities at Fort Hood, Texas  

Science Conference Proceedings (OSTI)

This report presents the results of Pacific Northwest National Laboratory's (PNNL) follow-on renewable energy (RE) assessment of Fort Hood. Fort Hood receives many solicitations from renewable energy vendors who are interested in doing projects on site. Based on specific requests from Fort Hood staff so they can better understand these proposals, and the results of PNNL's 2008 RE assessment of Fort Hood, the following resources were examined in this assessment: (1) Municipal solid waste (MSW) for waste-to-energy (WTE); (2) Wind; (3) Landfill gas; (4) Solar photovoltaics (PV); and (5) Shale gas. This report also examines the regulatory issues, development options, and environmental impacts for the promising RE resources, and includes a review of the RE market in Texas.

Solana, Amy E.; Warwick, William M.; Orrell, Alice C.; Russo, Bryan J.; Parker, Kyle R.; Weimar, Mark R.; Horner, Jacob A.; Manning, Anathea

2011-11-14T23:59:59.000Z

35

City of Fort Worth - Executive Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

program eligibility Advocate for and develop commercial PACE program Support On program 1 INTRODUCTION Fort Worth is a rapidly growing city of over 700,000 people. The City's...

36

Fort Hood solar energy project  

DOE Green Energy (OSTI)

During the period April 1975 to March 1978, the American Technological University (ATU) of Killeen, Texas, was awarded several follow-on contracts by the Division of Solar Energy (DSE), Energy Research and Development Administration (ERDA), which subsequently became the Division of Solar Technology (DST), Department of Energy (DOE). The contracts were to design a solar total energy system for use at Fort Hood, Texas. A review encompassing the period of the project from January 1975 to March 1978, was conducted by the Office of Inspector General (IG), DOE. The review examined both the management of the project by ATU and ERDA personnel and the award and administration by ERDA of the contracts to ATU for support of the project. The IG review found that: (1) there was a lack of continuity in the management of the project by both ATU and ERDA; (2) ERDA failed to maintain control of the project and failed to issue specific project direction to ATU; (3) ERDA failed to follow existing procurement regulations for the review and acceptance of unsolicited proposals from ATU; (4) the ERDA Headquarters program Manager and the Contract Administrator for the conceptual design phase of the project had failed to ensure that all the tasks which had been funded were performed by ATU; and (5) the decision by the Director, ERDA/DSE, to award successive contracts to ATU was questionable in view of ATU's performance on the project.

Not Available

1980-07-30T23:59:59.000Z

37

Kitsap County  

E-Print Network (OSTI)

Kitsap County Goals and Policies on Critical Areas........... 6 The BAS Process............................ 7

unknown authors

2004-01-01T23:59:59.000Z

38

Louisiana Nuclear Profile - River Bend  

U.S. Energy Information Administration (EIA) Indexed Site

River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

39

Fort Bliss Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Fort Bliss Geothermal Area Fort Bliss Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fort Bliss Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (22) 10 References Area Overview Geothermal Area Profile Location: Texas Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

40

Limited energy studies, Fort Rucker, Alabama  

SciTech Connect

The objective of this project was to evaluate the technical and economic feasibility of building and operating a liquified petroleum gas (LPG) storage facility at Fort Rucker. The primary heating fuel at Fort Rucker is natural gas; it is used in central steam plants and in central forced-air furnaces for family housing. Natural gas is purchased from the Southeast Alabama Gas District at there lowest rate. However, Fort Rucker also pays a natural gas demand charge based on the amount of natural gas used during curtailment. During a curtailment period, the natural gas demand is intended to be reduced as much as possible by switching the central steam plants to oil; but the family housing area continues to use nature gas. storage system would provide the capability of injecting a mixture of air and propane into the natural as distribution system during curtailment to reduce natural gas demand. This would result in lower gas bills throughout the year.

NONE

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Fort Totten Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Totten Wind Farm Totten Wind Farm Jump to: navigation, search Name Fort Totten Wind Farm Facility Fort Totten Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Spirit Lake Sioux Energy Purchaser Spirit Lake Sioux Location Fort Totten ND Coordinates 47.9817°, -99.0029° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.9817,"lon":-99.0029,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

42

Fort Bidwell Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Fort Bidwell Geothermal Area Fort Bidwell Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fort Bidwell Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.8617,"lon":-120.1592,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

43

Cove Fort Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Cove Fort Geothermal Area Cove Fort Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Cove Fort Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (2) 9 Exploration Activities (30) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.6,"lon":-112.55,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

44

Renewable Energy Opportunities at Fort Sill, Oklahoma  

DOE Green Energy (OSTI)

This document provides an overview of renewable resource potential at Fort Sill, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Sill took place on June 10, 2010.

Boyd, Brian K.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

2011-03-31T23:59:59.000Z

45

Microsoft Word - Kokanee Bend CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Kokanee Bend South Conservation Easement funding Fish and Wildlife Project No. and Contract No.: 2008-800-00, BPA-006863 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 30 North, Range 20 West, Section 30, Flathead County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA intends to fund Montana Fish, Wildlife, and Parks (MFWP) for the purchase of a conservation easement, on approximately 70 acres of property,

46

Fort Bidwell Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Fort Bidwell Geothermal Area Fort Bidwell Geothermal Area (Redirected from Fort Bidwell Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fort Bidwell Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.8617,"lon":-120.1592,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

47

Cove Fort Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Cove Fort Geothermal Area Cove Fort Geothermal Area (Redirected from Cove Fort Geothermal Area - Vapor) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Cove Fort Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (2) 9 Exploration Activities (30) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.6,"lon":-112.55,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

48

Energy Engineering Analysis Program (EEAP), Fort Bliss headquarters building, lighting retrofit, Fort Bliss, El Paso, Texas  

SciTech Connect

The purpose of this study is to analyze the use of high efficiency fluorescent lighting with energy efficient lamps and electronic ballast for the Headquarters Building (Bldg. number 2) at Fort Bliss.

1993-02-01T23:59:59.000Z

49

Fort Payne Improvement Auth | Open Energy Information  

Open Energy Info (EERE)

Auth Auth Jump to: navigation, search Name Fort Payne Improvement Auth Place Alabama Utility Id 6612 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Business Commercial Commercial Commercial Industrial Industrial Residential Residential Average Rates Residential: $0.0894/kWh Commercial: $0.0907/kWh Industrial: $0.0810/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Fort_Payne_Improvement_Auth&oldid=41071

50

Fort Loudoun Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Fort Loudoun Electric Coop Fort Loudoun Electric Coop Place Tennessee Utility Id 6608 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Power Rate-Schedule GSA 1 Commercial General Power Rate-Schedule GSA 2 Commercial General Power Rate-Schedule GSA 3 Commercial OUTDOOR LIGHTING RATE ( 150 Watt Metal Halide) Lighting OUTDOOR LIGHTING RATE ( 250 Watt HPS) Lighting OUTDOOR LIGHTING RATE ( 400 Watt HPS) Lighting OUTDOOR LIGHTING RATE ( 400 Watt Metal Halide) Lighting OUTDOOR LIGHTING RATE( 100 Watt HPS) Lighting

51

Renewable Energy Opportunities at Fort Hood, Texas  

DOE Green Energy (OSTI)

The document provides an overview of renewable resource potential at Fort Hood based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 DoD Renewables Assessment. This effort focuses on grid-connected generation of electricity from renewable energy sources and also ground source heat pumps for heating and cooling buildings, as directed by IMCOM.

Chvala, William D.; Warwick, William M.; Dixon, Douglas R.; Solana, Amy E.; Weimar, Mark R.; States, Jennifer C.; Reilly, Raymond W.

2008-06-30T23:59:59.000Z

52

EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Hyde County Wind Energy Center Project, Hyde and Buffalo 61: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota Summary This EIS will evaluate the environmental impacts of interconnecting the proposed 150 megawatt Hyde County Wind Energy Center Project, in Hyde County, South Dakota, with DOE's Western Area Power Administration's existing Fort Thompson Substation in Buffalo County, South Dakota. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download October 19, 2011 EIS-0461: Notice of Cancellation of the Environmental Impact Statement Hyde County Wind energy Center Project November 30, 2010 EIS-0461: Notice of Intent to Prepare an Environmental Impact Statement and

53

Method for uniformly bending conduits  

DOE Patents (OSTI)

The present invention is directed to a method for bending metal tubing through various radii while maintaining uniform cross section of the tubing. The present invention is practical by filling the tubing to a sufficient level with water, freezing the water to ice and bending the ice-filled tubing in a cooled die to the desired radius. The use of the ice as a filler material provides uniform cross-sectional bends of the tubing and upon removal of the ice provides an uncontaminated interior of the tubing which will enable it to be used in its intended application without encountering residual contaminants in the tubing due to the presence of the filler material.

Dekanich, S.J.

1984-04-27T23:59:59.000Z

54

Multispectral Imaging At Cove Fort Area (Laney, 2005) | Open Energy  

Open Energy Info (EERE)

Cove Fort Area (Laney, 2005) Cove Fort Area (Laney, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Multispectral Imaging At Cove Fort Area (Laney, 2005) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Multispectral Imaging Activity Date Usefulness useful DOE-funding Unknown Notes Geology and Geophysics of Geothermal Systems, Gregory Nash, 2005. Vegetalspectral analysis at Cove Fort-Sulphurdale, Utah was tested as a method of detecting hidden faults in exploration efforts. This effort proved to be successful and resulted in the Following published paper: Nash, G. D., J. N. Moore, and T. Sperry, 2003. "Vegetal-spectral anomaly detection at the Cove Fort-Sulphurdale thermal anomaly, Utah, USA: implications for use in geothermal exploration." Geothermics, v. 32, p.

55

City of Fort Collins Comment on Information Collection Extension, October  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Fort Collins Comment on Information Collection Extension, City of Fort Collins Comment on Information Collection Extension, October 2011 City of Fort Collins Comment on Information Collection Extension, October 2011 The City of Fort Collins provided comments to the Department of Energy's notice of intent to seek approval of an extension of Information Collection 1910-5149 for Recovery Act Smart Grid Investment Grant reporting for four years, which was published in the Federal Register August 10, 2011, Vol. 76, No. 154, page 49460. Fort Collins finds the current collection period burdensome and recommends quarterly reporting. View information on Recovery Act Smart Grid Investment Grants. View the Federal Register Notice. City of Fort Collins FRN Information Collection comments.pdf More Documents & Publications

56

Fort Boise Veteran's Hospital District Heating Low Temperature...  

Open Energy Info (EERE)

Boise Veteran's Hospital District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Fort Boise Veteran's Hospital District Heating Low Temperature...

57

Fort Collins Utilities - Residential and Small Commercial Appliance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RefrigeratorFreezer Recycling: 35, plus free pick-up Fort Collins Utilities offers a number of appliance and recycling rebates to residential and small commercial customers....

58

NETL: News Release - Federal Environmental Laboratory at Fort...  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Laboratory at Fort Meade to be Powered by Revolutionary Fuel Cell Power Plant Richardson, Browner Announce Government "Showcase" Project WASHINGTON, DC - The...

59

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et...  

Open Energy Info (EERE)

to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details...

60

Geographic Information System At Cove Fort Area - Vapor (Nash...  

Open Energy Info (EERE)

Unknown Notes An example, shown in Figure 1, shows results from the classification of big sagebrush (Artimesia tridentata) spectra, acquired over the Cove Fort-Sulphurdale,...

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

U.S. Army Fort Carson Photovoltaics Project Lease  

NLE Websites -- All DOE Office Websites (Extended Search)

with Fort Carson's hazardous waste. g. If it is determined by the Environmental Baseline Survey andlor NEPA process that there is the potential for hazardous waste, fuel, and...

62

Town of Fort Supply, Oklahoma (Utility Company) | Open Energy...  

Open Energy Info (EERE)

Supply, Oklahoma (Utility Company) Jump to: navigation, search Name Town of Fort Supply Place Oklahoma Utility Id 6618 Utility Location Yes Ownership M NERC Location SPP NERC SPP...

63

Pressure Temperature Log At Fort Bliss Area (DOE GTP) | Open...  

Open Energy Info (EERE)

Edit History Facebook icon Twitter icon Pressure Temperature Log At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

64

Fort Thompson, South Dakota: Energy Resources | Open Energy Informatio...  

Open Energy Info (EERE)

Edit with form History Share this page on Facebook icon Twitter icon Fort Thompson, South Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia...

65

OBSERVATION REPORT BendKing Pipe Bending Machine.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

BENDKING PIPE BENDING MACHI\NE BENDKING PIPE BENDING MACHI\NE DEMONSTRATION Field Observation Report for December 3 - 4, 2001 Date Published: March 2002 Brian Meindinger, RMOTC PREPARED FOR THE U.S. DEPARTMENT OF ENERGY ROCKY MOUNTAIN OILFIELD TESTING CENTER 907 N. POPLAR, SUITE 150 CASPER, WY 82601 1-888-599-2200 Approval: RMOTC Manager_____________________________ Date:______________ Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or any third party's use or the results of such use of any

66

Bend ductility of tungsten heavy alloys  

SciTech Connect

A bend ductility test is used to indicate the formability of tungsten heavy alloys sheet. The primary test bends a notchless Charpy impact specimen to a bend angle of approximately 100C. This can be augmented by a bend-completion test. Finite element modeling as well as strain-gaged bend specimens elucidate the strain distribution in the specimen as a function of material thickness and bend angle. The bend ductilities of 70%W, 807.W and 90%W alloys are characterized. As expected, decreasing thickness or tungsten content enhances bend ductility. Oxidation is not detrimental; therefore, controlled atmosphere is not required for cooling. The potentially detrimental effects of mechanical working (e.g., rolling, roller-leveling, grit blasting, and peening) and machining (e.g., cutting and sanding) are illustrated.

Gurwell, W.E.; Garnich, M.R.; Dudder, G.B.; Lavender, C.A.

1992-11-01T23:59:59.000Z

67

A Dynamic Reversal Bending Fatigue Testing System  

A bending fatigue system has been proposed and developed in this disclosure to test various structural materials in general.

68

School of Social Work Fort Collins, Colorado 80523-1586  

E-Print Network (OSTI)

environment and graduating social work practitioners who excel in their professional lives. Students-time; or taking your courses in Thornton, Colorado Springs, Fort Collins or on-line, the School of Social WorkSchool of Social Work Fort Collins, Colorado 80523-1586 Phone (970) 491-6612 Fax (970) 491

Stephens, Graeme L.

69

Radiometrics At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Radiometrics At Fort Bliss Area (DOE GTP) Radiometrics At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Radiometrics At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Radiometrics Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Radiometrics_At_Fort_Bliss_Area_(DOE_GTP)&oldid=402615" Categories: Exploration Activities DOE Funded Activities ARRA Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863747441

70

Spontaneous Potential At Fort Bidwell Area (Laney, 2005) | Open Energy  

Open Energy Info (EERE)

Spontaneous Potential At Fort Bidwell Area (Laney, 2005) Spontaneous Potential At Fort Bidwell Area (Laney, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Spontaneous Potential Well Log At Fort Bidwell Area (Laney, 2005) Exploration Activity Details Location Fort Bidwell Area Exploration Technique Spontaneous Potential Well Log Activity Date Usefulness not indicated DOE-funding Unknown Notes Magnetotelluric Imaging, G. Michael Hoversten. The project title derived from its inception. The project however moved from the application of MT on Kilauea in 2003 to the use of combined SP and conductivity mapping (MT) in 2004. The beginning of 2004 saw the completions of the Kilauea MT experiment by the acquisition of an additional 45 MT stations on Kilauea. We therefore decided to use the funds available to work at the Fort Bidwell

71

Flow Test At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

72

2-M Probe At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

2-M Probe At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: 2-M Probe At Fort Bliss Area (DOE GTP) Exploration...

73

Density Log at Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Density Log at Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Density Log at Fort Bliss Area (DOE GTP) Exploration...

74

Fort Valley Utility Comm | Open Energy Information  

Open Energy Info (EERE)

Utility Comm Utility Comm Jump to: navigation, search Name Fort Valley Utility Comm Place Georgia Utility Id 6617 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Operates Generating Plant Yes Activity Buying Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL: #20 Commercial INDUSTRIAL LARGE POWER: #26/28 Industrial INSTITUTIONAL: #14 Commercial Industrial Small Power Industrial RESIDENTIAL: #10 Residential SMALL COMMERCIAL: #22 Commercial Average Rates Residential: $0.0787/kWh Commercial: $0.1030/kWh Industrial: $0.0772/kWh References

75

Master environmental plan for Fort Devens, Massachusetts  

SciTech Connect

Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

1991-11-01T23:59:59.000Z

76

Operational testing highlights of Fort St. Vrain  

SciTech Connect

The Fort St. Vrain program has progressed through construction, preoperational testing, fuel loading, initial criticality, and operational testing at power levels up to 2 percent related power. To date, all tests necessary before the rise to full power have been completed, and the rise-to- power program is expected to be resumed again in late 1975. Major plant systems, including the prestressed concrete reactor vessel and circulators, have demonstrated adequate performance. Extensive tests on the reactor core at zero power and up to 2 percent power have demonstrated the accuracy in the design predictions of such core characteristics as critical rod position, control system worths, neutron flux distributions, and temperature coefficients. Gaseous fission product release measurements to date have confirmed the extensive analytical estimates. 6 references (auth)

Cadwell, J.J.; McEachern, D.W.; Read, J.W.; Simon, W.A.; Walker, R.F.

1975-09-29T23:59:59.000Z

77

Fort Pierce Utilities Auth | Open Energy Information  

Open Energy Info (EERE)

Utilities Auth Utilities Auth Jump to: navigation, search Name Fort Pierce Utilities Auth Place Florida Utility Id 6616 Utility Location Yes Ownership M NERC Location FRCC NERC FRCC Yes ISO Other Yes Operates Generating Plant Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Demand Commercial Commercial General Service High Load Factor Industrial General Service Large Demand Industrial Non-Demand Commercial Single Phase Commercial Non-Demand Commercial Three Phase Commercial Residential Residential Average Rates Residential: $0.1440/kWh

78

Cook County- LEED Requirements for County Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In 2002, Cook County enacted an ordinance requiring all new county buildings and all retrofitted county buildings to be built to LEED standards. Specifically, all newly constructed buildings and...

79

Counties | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Counties Counties Data Apps Challenges Policies Counties Welcome to Counties.Data.gov Bridging information from across the United States. Look at the data, use the apps, join the...

80

Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations  

SciTech Connect

The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers to a regional secure smart grid.

Anderson, K.; Markel, T.; Simpson, M.; Leahey, J.; Rockenbaugh, C.; Lisell, L.; Burman, K.; Singer, M.

2011-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Structural basis for DNA bending  

Science Conference Proceedings (OSTI)

The authors report proton NMR studies on DNA oligonucleotides that contain A tracts of lengths known to produce various degrees of bending. Spectra of duplexes in the series 5{prime}-(GGCA{sub n}CGG){center dot}(CCGT{sub n}GCC) (n = 3,4,5,7,9) reveal substantial structural changes within the A{sub n}{center dot}T{sub n} tract as its length is increased. Chemical-shift comparisons show that A tracts with fewer than about seven members do not contain regions of uniform structure. Throughout the series, there is a striking monotonic relationship between the location of an A{center dot}T pair in the A tract and the relative position of its ThyH3 resonance. The direction of this chemical-shift dispersion is opposite to that expected from consideration of ring-current effects alone. This model features a substantial negative base-pair tilt, which has been suggested previously as the source of A-tract bending. In contrast, the nuclear Overhauser effect distances are inconsistent with at least one known crystallographic A-tract structure which lacks appreciable base-pair tilt.

Nadeau, J.G.; Crothers, D.M. (Yale Univ., New Haven, CT (USA))

1989-04-01T23:59:59.000Z

82

Microsoft Word - JAS-Fort Nelson.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Fort Nelson Demonstration Test Fort Nelson Demonstration Test 1 FACT SHEET FOR PARTNERSHIP DEMONSTRATION TEST Partnership Name Plains CO 2 Reduction (PCOR) Partnership - Phase III Contacts: DOE/NETL Project Mgr. Name Organization E-Mail Darin Damiani, U.S. Department of Energy, Darin.Damiani@netl.doe.gov Principal Investigator Edward Steadman Field Test Information: Field Test Name Fort Nelson Demonstration Test Test Location British Columbia, Canada Amount and Source of CO 2 Tons Approximately 1.2 million tons of CO 2 per year Source Fort Nelson natural gas-processing plant Spectra Energy Natural Resources Canada Field Test Partners (Primary Sponsors) British Columbia Ministry of Energy, Mines, and Petroleum Resources

83

Clean Cities: Dallas-Fort Worth Clean Cities coalition  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Dallas-Fort Worth Clean Cities Coalition Dallas-Fort Worth Clean Cities Coalition The Dallas-Fort Worth Clean Cities coalition works with vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Dallas-Fort Worth Clean Cities coalition Contact Information Pamela Burns 817-704-2510 pburns@nctcog.org Coalition Website Clean Cities Coordinator Pamela Burns Photo of Pamela Burns Pamela Burns has been a co-coordinator of the Dallas-Ft. Worth Clean Cities coalition since 2007. She is also a communications coordinator with the North Central Texas Council of Governments, the Metropolitan Planning Organization (MPO) for the Dallas-Ft. Worth (DFW) area. The MPO serves the region by developing transportation plans and programs that address the transportation needs of the rapidly growing metropolitan area. Burns works

84

City of Fort Collins, Colorado (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Collins, Colorado (Utility Company) Collins, Colorado (Utility Company) (Redirected from City of Fort Collins Utilities) Jump to: navigation, search Name Fort Collins City of Place Fort Collins, Colorado Utility Id 6604 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes ISO Other Yes Activity Distribution Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. City of Fort Collins Utilities Smart Grid Project was awarded $18,101,263 Recovery Act Funding with a total project value of $36,202,527. Utility Rate Schedules

85

Fort Collins Utilities - Residential and Small Commercial Appliance Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Small Commercial Appliance and Small Commercial Appliance Rebate Program Fort Collins Utilities - Residential and Small Commercial Appliance Rebate Program < Back Eligibility Residential Savings Category Appliances & Electronics Program Info Funding Source Fort Collins Utilities and the Governor's Energy Office State Colorado Program Type Utility Rebate Program Rebate Amount Clothes washer: $50 Dishwasher: $25 Refrigerator/Freezer Recycling: $35, plus free pick-up Fort Collins Utilities offers a number of appliance and recycling rebates to residential and small commercial customers. The appliance rebate program offers a $50 rebate for Energy Star rated clothes washers and $25 for Energy Star dishwashers. Applications for equipment rebates are available on the Fort Collins web site as well as at select local manufacturers and

86

Fort Pierce Utilities Authority - Residential Energy Efficiency Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fort Pierce Utilities Authority - Residential Energy Efficiency Fort Pierce Utilities Authority - Residential Energy Efficiency Rebate Program Fort Pierce Utilities Authority - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Maximum Rebate Insulation: $300 Room A/C Units: 2 per household All other equipment: 1 per customer account Program Info State Florida Program Type Utility Rebate Program Rebate Amount Room A/C Unit: $150 Insulation: $0.40/sq ft (NEW); $0.125/sq ft (ADDED) Central A/C System/Heat Pumps: $50 - $2,100; varies by size and efficiency Programmable Thermostat: $25 Clothes Washer: $50 Refrigerator: $50 Provider Fort Pierce Utilities Authority

87

Fort Collins Utilities - Residential On-Bill Financing Program Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fort Collins Utilities - Residential On-Bill Financing Program Fort Collins Utilities - Residential On-Bill Financing Program Program (Colorado) Fort Collins Utilities - Residential On-Bill Financing Program Program (Colorado) < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Appliances & Electronics Sealing Your Home Design & Remodeling Windows, Doors, & Skylights Ventilation Construction Commercial Heating & Cooling Heating & Cooling Heating Heat Pumps Water Heating Solar Maximum Rebate $15,000 Program Info State Colorado Program Type Utility Loan Program Rebate Amount $1,000 - $15,000 Fort Collins offers its residential customers low-interest loans that may be used to finance a variety of projects including adding insulation, replacing a furnace, upgrading water and space heating systems, and

88

Federal Energy Management Program: Case Study - Fort Knox Strikes...  

NLE Websites -- All DOE Office Websites (Extended Search)

resource Send a link to Federal Energy Management Program: Case Study - Fort Knox Strikes Energy-Savings Gold in Partnership with Utility to someone by E-mail Share Federal Energy...

89

Bright Green Spot: Fort Worth Library | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bright Green Spot: Fort Worth Library Bright Green Spot: Fort Worth Library Bright Green Spot: Fort Worth Library September 30, 2010 - 4:07pm Addthis Lindsay Gsell Fort Worth's Central Library is seeing tremendous energy savings by cutting down consumption. Using an Energy Efficiency and Conservation Block Grant from the Recovery Act, the city was able to have the building retrofitted and install a building management system. The system allows library staff to control the indoor climate of the library from one location to reduce operating costs of the facility. Addthis Related Articles Captured data from the monitoring system at the public library shows that energy usage was highest at 10:30a.m., a time when a number of patrons in the library would be using computers and lighting. | Photo courtesy of Texas Institute for Sustainable Technology Research

90

Update On Geothermal Exploration At Fort Bidwell, Surprise Valley  

Open Energy Info (EERE)

Geothermal Exploration At Fort Bidwell, Surprise Valley Geothermal Exploration At Fort Bidwell, Surprise Valley California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Update On Geothermal Exploration At Fort Bidwell, Surprise Valley California Details Activities (1) Areas (1) Regions (0) Abstract: A fourth exploration well within Fort Bidwell Indian Community (FBIC) lands has been successfully drilled to a total depth of 4,670 feet. Mud return temperatures and cuttings analysis are consistent with the hydrothermal model on which the well location was based. Wireline surveys have encountered an obstruction just below the casing shoe, and further evaluation of this well and resource awaits clean-out and testing activities. Author(s): Joe LaFleur, Anna Carter, Karen Moore, Ben Barker, Paul

91

Microsoft Word - JAS-Fort Nelson.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Test Name Fort Nelson Demonstration Test Test Location British Columbia, Canada Amount and Source of CO 2 Tons Approximately 1.2 million tons of CO 2 per year Source...

92

The Bending of Wood With Steam.  

E-Print Network (OSTI)

??Based on experimentation with the steam bending of wood to curved shapes, this thesis describes my involvement with three basic aspects of the process. First (more)

Cottey Jr., James H.

2008-01-01T23:59:59.000Z

93

Four years of operations and results with FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

Klingner, P. L. (Phillip L.); Carlson, L. D. (Leslie D.); Dingler, R. D. (Robert D.); Esch-Mosher, D. M. (Diana M.); Jacobson, A. R.; Roussel-Dupre, D. (Diane)

2001-01-01T23:59:59.000Z

94

FOUR YEARS OF OPERATIONS AND RESULTS WITH FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

D. ROUSSEL-DUPRE; P. KLINGNER; L. CARLSON; ET AL

2001-06-01T23:59:59.000Z

95

Thunderstorm and Lightning Studies using the FORTE Optical Lightning System (FORTE/OLS)  

Science Conference Proceedings (OSTI)

Preliminary observations of simultaneous RF and optical emissions from lightning as seen by the FORTE spacecraft are presented. RF/optical pairs of waveforms are routinely collected both as individual lightning events and as sequences of events associated with cloud-to-ground (CG) and intra-cloud (IC) flashes. CG pulses can be distinguished from IC pulses based on the properties of the RF and optical waveforms, but mostly based on the associated RF spectrograms. The RF spectrograms are very similar to previous ground-based VHF observations of lightning and show signatures associated with return strokes, stepped and dart leaders, and attachment processes,. RF emissions are observed to precede the arrival of optical emissions at the satellite by a mean value of 280 microseconds. The dual phenomenology nature of these observations are discussed in terms of their ability to contribute to a satellite-based lightning monitoring mission.

Argo, P.; Franz, R.; Green, J.; Guillen, J.L.; Jacobson, A.R.; Kirkland, M.; Knox, S.; Spalding, R.; Suszcynsky, D.M.

1999-02-01T23:59:59.000Z

96

City of Fort Collins, Colorado (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Fort Collins City of Place Fort Collins, Colorado Utility Id 6604 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes ISO Other Yes Activity Distribution Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. City of Fort Collins Utilities Smart Grid Project was awarded $18,101,263 Recovery Act Funding with a total project value of $36,202,527. Utility Rate Schedules Grid-background.png GENERAL SERVICE Single Phase 200 AMP Service Commercial

97

Central Energy System Modernization at Fort Jackson, South Carolina  

SciTech Connect

An evaluation of technology options was conducted for the central energy systems at Fort Jackson, South Carolina. There were two objectives in conducting this study. From a broader viewpoint, the Army would like to develop a systematic approach to management of its central energy systems and selected Fort Jackson for this ''pilot'' study for a prospective Central Energy System Modernization Program. From a site-specific perspective, the objective was to identify the lowest life-cycle cost energy supply option(s) at Fort Jackson for buildings currently served by central boilers and chillers. This study was co-funded by the Army's Southeast Region and the U.S. Department of Energy's Federal Energy Management Program.

Brown, Daryl R.; Chvala, William D.; Dirks, James A.

2006-11-29T23:59:59.000Z

98

Big Bend Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

icon Twitter icon Big Bend Electric Coop, Inc Jump to: navigation, search Name Big Bend Electric Coop, Inc Place Washington Utility Id 1723 Utility Location Yes...

99

Renewable Energy Opportunities at Fort Campbell, Tennessee/Kentucky  

DOE Green Energy (OSTI)

This document provides an overview of renewable resource potential at Fort Campbell, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Campbell took place on June 10, 2010.

Hand, James R.; Horner, Jacob A.; Kora, Angela R.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

2011-03-31T23:59:59.000Z

100

Renewable Energy Opportunities at Fort Drum, New York  

DOE Green Energy (OSTI)

This document provides an overview of renewable resource potential at Fort Drum, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Drum took place on May 4 and 5, 2010.

Brown, Scott A.; Orrell, Alice C.; Solana, Amy E.; Williamson, Jennifer L.; Hand, James R.; Russo, Bryan J.; Weimar, Mark R.; Rowley, Steven; Nesse, Ronald J.

2010-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Dorchester County- Renewable Zoning  

Energy.gov (U.S. Department of Energy (DOE))

Dorchester County zoning codes specifically permit solar arrays and small wind turbines in many zoning districts.

102

Horseshoe Bend Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Horseshoe Bend Wind Farm Horseshoe Bend Wind Farm Jump to: navigation, search Name Horseshoe Bend Wind Farm Facility Horseshoe Bend Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner United Materials Developer Exergy Development Group Energy Purchaser Idaho Power Location West of Great Falls MT Coordinates 47.497516°, -111.432567° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.497516,"lon":-111.432567,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

103

Poudre High School From Fort Collins , Colorado Wins U.S. Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Poudre High School From Fort Collins , Colorado Wins U.S. Department of Energy National Science Bowl Poudre High School From Fort Collins , Colorado Wins U.S. Department of...

104

FINISHED CORRECTIONS for the reprint of Barton H. Barbour, Fort Union and the Upper Missouri Fur Trade  

E-Print Network (OSTI)

Blackfeet torched Fort Piegan in 1832, and the Company built a new post, Fort McKenzie, a few miles away

Barrash, Warren

105

Energy survey of Army Laundry Facilities, Fort Jackson, South Carolina; executive summary  

SciTech Connect

The purpose of this study is to evaluate the technical and economic feasibility of energy conservation opportunities at the Fort Jackson Laundry Facility. This study was conducted under Contract Number DACA21-85-C-0587 entitled `Energy Survey of Army Laundry Facilities, Fort Bragg, North Carolina and Fort Jackson, South Carolina.` The Fort Jackson portion of this study was initiated on March 26, 1986 by letter from Jerry T. Hines, Lieutenant Colonel, Corps of Engineers.

1985-12-31T23:59:59.000Z

106

Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail  

SciTech Connect

This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

1994-01-01T23:59:59.000Z

107

Fort Union Regional Task Forces, proceedings. Volume II  

SciTech Connect

North Dakota, South Dakota, Montana, and Wyoming created seven task forces to study the interstate effects of the Fort Union Coal Formation which underlies parts of each of these states. Volume 2 discusses the following: (1) social and economic impact; (2) taxation of energy resources; and (3) water quality and quality problems. (Portions of this document are not fully legible)

1977-01-01T23:59:59.000Z

108

Fort Union Regional Task Forces, proceedings. Volume I  

SciTech Connect

North Dakota, South Dakota, Montana, and Wyoming created seven task forces to study the interstate effects of the Fort Union Coal Formation which underlies parts of each of these states. Volume 1 covers: (1) air quality; (2) common data element and information exchange; (3) energy development, regulation, and plant siting; and (4) reclamation and land use. (Portions of this document are not fully legible)

1977-01-01T23:59:59.000Z

109

Microsoft Word - CX-NorthBendWoodPoles_FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Bend District Wood Pole Replacement Projects North Bend District Wood Pole Replacement Projects PP&A Project No.: 2658 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Various transmission lines located in Douglas, Linn, and Lane counties, Oregon. Refer to Project Location Attachment for transmission lines and corresponding structure locations. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from

110

Balance : Lancaster County's tragedy  

E-Print Network (OSTI)

Lancaster County, Pennsylvania residents are proud of their agricultural heritage. They do not want to see their farmland disappear. But the County continues to be developed into residential subdivisions. This thesis ...

Gingrich, Valerie (Valerie J.)

2007-01-01T23:59:59.000Z

111

Kiowa County Commons Building  

Energy.gov (U.S. Department of Energy (DOE))

This poster describes the energy efficiency features and sustainable materials used in the Kiowa County Commons Building in Greensburg, Kansas.

112

Carroll County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance sets forth regulations for the zoning, erection, and operation of small wind energy systems in Carroll County, Maryland.

113

Kent County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance establishes provisions and standards for small wind energy systems in various zoning districts in Kent County, Maryland.

114

A Comparative Study of the Mississippian Barnett Shale, Fort Worth Basin, and Devonian Marcellus Shale, Appalachian Basin  

NLE Websites -- All DOE Office Websites (Extended Search)

A Comparative Study of the A Comparative Study of the Mississippian Barnett Shale, Fort Worth Basin, and Devonian Marcellus Shale, Appalachian Basin DOE/NETL-2011/1478 Cover. Top left: The Barnett Shale exposed on the Llano uplift near San Saba, Texas. Top right: The Marcellus Shale exposed in the Valley and Ridge Province near Keyser, West Virginia. Photographs by Kathy R. Bruner, U.S. Department of Energy (USDOE), National Energy Technology Laboratory (NETL). Bottom: Horizontal Marcellus Shale well in Greene County, Pennsylvania producing gas at 10 million cubic feet per day at about 3,000 pounds per square inch. Photograph by Tom Mroz, USDOE, NETL, February 2010. ACKNOWLEDGMENTS The authors greatly thank Daniel J. Soeder (U.S. Department of Energy) who kindly reviewed the manuscript. His criticisms,

115

City of Fort Morgan, Colorado (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Fort Morgan Fort Morgan Place Colorado Utility Id 6610 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL AREA LIGHTING (FLAT RATE) Lighting HIGHWAY FOG LIGHTING (FLAT RATE) Lighting INDUSTRIAL TRANSMISSION LEVEL Industrial INTERRUPTIBLE LOAD MANAGEMENT SERVICE Industrial IRRIGATION Commercial LARGE COMMERCIAL Commercial MUNICIPAL Commercial RESIDENTIAL DEMAND METERED Residential RESIDENTIAL GENERAL Residential RESIDENTIAL LIGHTING (FLAT RATE) Lighting SMALL COMMERCIAL DEMAND METERED Commercial

116

MHK Projects/Fort Adams | Open Energy Information  

Open Energy Info (EERE)

Fort Adams Fort Adams < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.0533,"lon":-91.5651,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

117

U.S. Army Fort Carson Environmental Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF SUITABILITY TO LEASE FINDING OF SUITABILITY TO LEASE 3 Phases Energy Services Land Lease Us Army Installation Management Command Headquarters, United States Army Garrison, Fort Carson 1.0 PURPOSE The purpose of this Finding of Suitability to Lease (FOSL) is to document the environmental suitability of property at Fort Carson, Colorado, for leasing and construction of a 2 Megawatt (2 MW) solar photovoltaic (PV) plant consistent with Department of Defense (DOD) and Army policy. In addition, the FOSL identifies use restrictions as specified in the attached Environmental Protection Provisions necessary to protect human health or the environment and to prevent interference with existing and planned environmental restoration activities. 2.0 PROPERTY DESCRIPTIONS The property to be leased consists of approximately 18.1518 acres of land located inside a

118

Fort Boise Veteran's Hospital District Heating Low Temperature Geothermal  

Open Energy Info (EERE)

Boise Veteran's Hospital District Heating Low Temperature Geothermal Boise Veteran's Hospital District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Fort Boise Veteran's Hospital District Heating Low Temperature Geothermal Facility Facility Fort Boise Veteran's Hospital Sector Geothermal energy Type District Heating Location Boise, Idaho Coordinates 43.6135002°, -116.2034505° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

119

U.S. Army Fort Carson Environmental Document  

NLE Websites -- All DOE Office Websites (Extended Search)

FINDING OF SUITABILITY TO LEASE FINDING OF SUITABILITY TO LEASE 3 Phases Energy Services Land Lease Us Army Installation Management Command Headquarters, United States Army Garrison, Fort Carson 1.0 PURPOSE The purpose of this Finding of Suitability to Lease (FOSL) is to document the environmental suitability of property at Fort Carson, Colorado, for leasing and construction of a 2 Megawatt (2 MW) solar photovoltaic (PV) plant consistent with Department of Defense (DOD) and Army policy. In addition, the FOSL identifies use restrictions as specified in the attached Environmental Protection Provisions necessary to protect human health or the environment and to prevent interference with existing and planned environmental restoration activities. 2.0 PROPERTY DESCRIPTIONS The property to be leased consists of approximately 18.1518 acres of land located inside a

120

Fort Belknap Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Belknap Electric Coop Inc Belknap Electric Coop Inc Jump to: navigation, search Name Fort Belknap Electric Coop Inc Place Texas Utility Id 6611 Utility Location Yes Ownership C NERC Location TRE NERC ERCOT Yes ISO Ercot Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.1090/kWh Commercial: $0.1090/kWh Industrial: $0.0807/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Fort_Belknap_Electric_Coop_Inc&oldid=410715

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

City of Fort Meade, Florida (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Meade, Florida (Utility Company) Meade, Florida (Utility Company) Jump to: navigation, search Name City of Fort Meade Place Florida Utility Id 6609 Utility Location Yes Ownership M NERC Location FRCC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial, Demand Commercial Commercial, Non-Demand Commercial Residential, Inside City Residential Residential, Outside City Residential Average Rates Residential: $0.1550/kWh Commercial: $0.1570/kWh Industrial: $0.1540/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Fort_Meade,_Florida_(Utility_Company)&oldid=409610

122

Force-limited vibration tests aplied to the FORTE` satellite  

SciTech Connect

A force limited random vibration test was conducted on a small satellite called FORTE{prime}. This type of vibration test reduces the over testing that can occur in a conventional vibration test. Two vibration specifications were used in the test: The conventional base acceleration specification, and an interface force specification. The vibration level of the shaker was controlled such that neither the table acceleration nor the force transmitted to the test item exceeded its specification. The effect of limiting the shake table vibration to the force specification was to reduce (or ``notch``) the shaker acceleration near some of the satellite`s resonance frequencies. This paper describes the force limited test conducted for the FORTE{prime} satellite. The satellite and its dynamic properties are discussed, and the concepts of force limiting theory are summarized. The hardware and setup of the test are then described, and the results of the force limited vibration test are discussed.

Stevens, R.R.; Butler, T.A.

1996-02-01T23:59:59.000Z

123

Cedar Fort, Utah: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Fort, Utah: Energy Resources Fort, Utah: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.3271707°, -112.1043852° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.3271707,"lon":-112.1043852,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

124

Geothermal heat pumps at Fort Polk: Early results  

DOE Green Energy (OSTI)

At Fort Polk, LA an entire city (4,003 military family housing units) is being converted to geothermal heat pumps (GHP) under a performance contract. At the same time other efficiency measures such as compact fluorescent lights (CFLs), low-flow water outlets, and attic insulation are being installed. If these contracts and this technology are to be used widely in US Department of Defense (DoD) facilities and other public buildings, better data from actual projects is the key. Being the first GHP project of this type and size, Fort Polk proved to be very challenging for all concerned. To get from RFP to start of construction took several years. This hard work by others created a once-in-a-lifetime opportunity to address many of the due diligence issues that delayed the Fort Polk project. So that future projects can move faster, an evaluation has been undertaken to address the following barriers: absence of a documented large-scale demonstration of GHP energy, demand, and maintenance savings (a barrier to acceptance by federal customers, performance contractors, and investors); newness of large-scale facility capital renewal procurements at federal facilities under energy savings performance contracts (ESPCs) or traditional appropriations (lack of case studies); and variability in current GHP design tools (increases risks and costs for federal customers, performance contractors, investors and designers). This paper presents early energy and demand savings results based on data collection through January 1996.

Hughes, P.J.; Shonder, J.A.

1996-12-31T23:59:59.000Z

125

Development of Baseline Monthly Utility Models for Fort Hood, Texas  

E-Print Network (OSTI)

The Fort Hood Army base in central Texas has more than 5,200 buildings and can be considered as typical of large Department of Defense Army bases in the continental United States. The annual utility bill of the base exceeds $25 million. Baseline monthly models for electricity use, electricity demand, gas use, and water use for the three cantonment areas of Fort Hood have been developed. Such models can be used as screening tools for detecting changes in future utility bills and also to track/evaluate the extent to which Presidential Executive Order 12902, mandating 30% decrease in energy utility bills from 1985 to 2005, is being met. In this analysis, 1990 has been selected as the baseline year to illustrate the predictive capability of the models. Since ascertaining the uncertainty of our predictions is very important for meaningful evaluations, we have also presented the relevant equations for computing the 95% prediction intervals of the regression models and illustrated their use with measured data over the period of 1989-1993. This study also evaluated two different types of energy modeling software- the Princeton Scorekeeping method (PRISM) and EModel- in order to ascertain which is more appropriate for baseline modeling of large Army installations such as Fort Hood. It was found that the EModel software, which has more flexibility to handle different types of linear single variate change point models, gave more accurate modeling results.

Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.; Chalifoux, A.

1996-04-01T23:59:59.000Z

126

Development of Baseline Monthly Utility Models for Fort Hood, Texas  

E-Print Network (OSTI)

The Fort Hood Army base in central Texas has more than 5,200 buildings and can be considered as typical of large Department of Defense Army bases in the continental United States. The annual utility bill of the base exceeds $25 million. Baseline monthly models for electricity use, electricity demand, gas use, and water use for the three cantonment areas of Fort Hood have been developed. Such models can be used as screening tools for detecting changes in future utility bills and also to track/evaluate the extent to which Presidential Executive Order 12902, mandating 30% decrease in energy utility bills from 1985 to 2005, is being met. In this analysis, 1990 has been selected as the baseline year to illustrate the predictive capability of the models. Since ascertaining the uncertainty of our predictions is very important for meaningful evaluations, we have also presented the relevant equations for computing the 95% prediction intervals of the regression models and illustrated their use with measured data over the period 1989 - 1993. This study also evaluated two different types of energy modeling software- the Princeton Scorekeeping method (PRISM) and EModel- in order to ascertain which is more appropriate for baseline modeling of large Army installations such as Fort Hood. It was found that the EModel software, which has more flexibility to handle different types of linear single variate change point models, gave more accurate modeling results.

Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.; Chalifoux, A.

1996-01-01T23:59:59.000Z

127

Early Cook County Roads -- Part One  

NLE Websites -- All DOE Office Websites (Extended Search)

One One Nature Bulletin No. 738 January 11, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PARK ONE When Chicago was incorporated as a village in 1833 it was only a squalid hamlet of about 350 inhabitants and appeared to be so poorly situated that it was hopeless -- "crude cabins and flimsy shacks in a chaos of mud, rubbish and confusion. " Only a few feet above the level of Lake Michigan, the place was almost entirely surrounded by swamps and miles and miles of prairies that became nearly impassable after spring thaws and during periods of heavy rainfall. There were only two important routes that afforded access at all times. One was the Green Bay Trail, ancestor of North Clark St. in Chicago, Ridge Ave. in Evanston, and Green Bay Road north of that. The other, traveled by the soldiers coming from Detroit to build Fort Dearborn in 1803, used the Great Sauk Trail to La Porte, Indiana, then a trail northwesterly to what is now Michigan City, and the firm sands of the lake beach the rest of the way.

128

Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et  

Open Energy Info (EERE)

Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location.

129

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) |  

Open Energy Info (EERE)

Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal

130

Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) |  

Open Energy Info (EERE)

Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal

131

Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) |  

Open Energy Info (EERE)

(Redirected from Direct-Current Resistivity At Cove Fort Area - Vapor (Redirected from Direct-Current Resistivity At Cove Fort Area - Vapor (Warpinski, Et Al., 2002)) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location.

132

Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al.,  

Open Energy Info (EERE)

Cove Fort Area (Warpinski, Et Al., Cove Fort Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal

133

Los Angeles County - LEED for County Buildings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Angeles County - LEED for County Buildings Los Angeles County - LEED for County Buildings Los Angeles County - LEED for County Buildings < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Alternative Fuel Vehicles Hydrogen & Fuel Cells Heating Buying & Making Electricity Water Heating Wind Program Info State California Program Type Energy Standards for Public Buildings Provider Los Angeles County In January 2007, the Los Angeles County Board of Supervisors adopted rules to require that all new county buildings greater than 10,000 square feet be LEED Silver certified. All buildings authorized and fully funded on or

134

counties - more challenges | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

- more challenges Counties Data Apps Challenges Policies Counties You are here Data.gov Communities Counties Challenge.gov...

135

Category:Counties | Open Energy Information  

Open Energy Info (EERE)

Counties Counties Jump to: navigation, search This category contains all counties in the United States of America. Contents: Top - 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Pages in category "Counties" The following 200 pages are in this category, out of 3,142 total. (previous 200) (next 200) A Abbeville County, South Carolina Acadia Parish, Louisiana Accomack County, Virginia Ada County, Idaho Adair County, Iowa Adair County, Kentucky Adair County, Missouri Adair County, Oklahoma Adams County, Colorado Adams County, Idaho Adams County, Illinois Adams County, Indiana Adams County, Iowa Adams County, Mississippi Adams County, Nebraska Adams County, North Dakota Adams County, Ohio Adams County, Pennsylvania Adams County, Washington Adams County, Wisconsin

136

Bend, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Bend, OR) (Redirected from Bend, OR) Jump to: navigation, search Equivalent URI DBpedia Coordinates 44.0581728°, -121.3153096° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.0581728,"lon":-121.3153096,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

137

Nuclear fuels accounting interface: River Bend experience  

SciTech Connect

This presentation describes nuclear fuel accounting activities from the perspective of nuclear fuels management and its interfaces. Generally, Nuclear Fuels-River Bend Nuclear Group (RBNG) is involved on a day-by-day basis with nuclear fuel materials accounting in carrying out is procurement, contract administration, processing, and inventory management duties, including those associated with its special nuclear materials (SNM)-isotopics accountability oversight responsibilities as the Central Accountability Office for the River Bend Station. As much as possible, these duties are carried out in an integrated, interdependent manner. From these primary functions devolve Nuclear Fuels interfacing activities with fuel cost and tax accounting. Noting that nuclear fuel tax accounting support is of both an esoteric and intermittent nature, Nuclear Fuels-RBNG support of developments and applications associated with nuclear fuel cost accounting is stressed in this presentation.

Barry, J.E.

1986-01-01T23:59:59.000Z

138

Geochemical controls on production in the Barnett Shale, Fort Worth Basin.  

E-Print Network (OSTI)

??The Newark East field (Barnett Shale) in the Fort Worth Basin, Texas currently has the largest daily production of any gas field in Texas. Major (more)

Klentzman, Jana L.

2009-01-01T23:59:59.000Z

139

Thermal Gradient Holes At Fort Bliss Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Fort Bliss Area (DOE GTP) Exploration Activity Details Location...

140

U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling (Fact Sheet)  

DOE Green Energy (OSTI)

FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.

Not Available

2010-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Core Analysis At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Core Analysis At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core...

142

U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling  

Energy.gov (U.S. Department of Energy (DOE))

Fact sheet covers the FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney barracks.

143

An evaluation of the Fort Polk energy savings performance contract  

SciTech Connect

The US Army, in cooperation with an energy services company (ESCO), used private capital to retrofit 4,003 family housing units on the Fort Polk, Louisiana, military base with geothermal heat pumps (GHPs). The project was performed under an energy savings performance contract (ESPC) that provides for the Army and the ESCO to share the cost savings realized through the energy retrofit over the 20-year life of the contract. Under the terms of the contract, the ESCO is responsible for maintaining the GHPs and provides ongoing measurement and verification (M and V) to assure cost and energy savings to the Army. An independent evaluation conducted by the Department of Energy`s Oak Ridge National Laboratory indicates that the GHP systems in combination with other energy retrofit measures have reduced annual whole-community electrical consumption by 33%, and natural gas consumption by 100%. These energy savings correspond to an estimated reduction in CO{sub 2} emissions of 22,400 tons per year. Peak electrical demand has been reduced by 43%. The electrical energy and demand savings correspond to an improvement in the whole-community annual electric load factor from 0.52 to 0.62. As a result of the project, Fort Polk saves about $450,000 annually and benefits from complete renewal of the major energy consuming systems in family housing and maintenance of those systems for 20 years. Given the magnitude of the project, the cost and energy savings achieved, and the lessons learned during its design and implementation, the Fort Polk ESPC can provide a model for other housing-related energy savings performance contracts in both the public and private sectors.

Hughes, P.J.; Shonder, J.A.

1998-11-01T23:59:59.000Z

144

Dynamic computer simulation of the Fort St. Vrain steam turbines  

SciTech Connect

A computer simulation is described for the dynamic response of the Fort St. Vrain nuclear reactor regenerative intermediate- and low-pressure steam turbines. The fundamental computer-modeling assumptions for the turbines and feedwater heaters are developed. A turbine heat balance specifying steam and feedwater conditions at a given generator load and the volumes of the feedwater heaters are all that are necessary as descriptive input parameters. Actual plant data for a generator load reduction from 100 to 50% power (which occurred as part of a plant transient on November 9, 1981) are compared with computer-generated predictions, with reasonably good agreement.

Conklin, J.C.

1983-01-01T23:59:59.000Z

145

Wind Monitoring Report for Fort Wainwright's Donnelly Training Area  

DOE Green Energy (OSTI)

Using the wind data collected at a location in Fort Wainwrights Donnelly Training Area (DTA) near the Cold Regions Test Center (CRTC) test track, Pacific Northwest National Laboratory (PNNL) estimated the gross and net energy productions that proposed turbine models would have produced exposed to the wind resource measured at the meteorological tower (met tower) location during the year of measurement. Calculations are based on the proposed turbine models standard atmospheric conditions power curves, the annual average wind speeds, wind shear estimates, and standard industry assumptions.

Orrell, Alice C.; Dixon, Douglas R.

2011-01-18T23:59:59.000Z

146

Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations  

NLE Websites -- All DOE Office Websites (Extended Search)

Targeting Net Zero Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations Prepared for the U.S. Department of Energy Federal Energy Management Program By National Renewable Energy Laboratory Kate Anderson, Tony Markel, Mike Simpson, John Leahey, Caleb Rockenbaugh, Lars Lisell, Kari Burman, and Mark Singer October 2011 ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

147

Wicomico County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

Establishes zoning regulations for the installation and construction of small wind energy systems in Wicomico County for private landowners, subject to reasonable restrictions.

148

Washington County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance establishes regulations to facilitate the installation and construction of Small Wind Energy Systems in Washington County for private landowners, subject to reasonable restrictions...

149

Montgomery County Public Schools  

Science Conference Proceedings (OSTI)

... Montgomery County Public Schools (MCPS) is the largest school district in the state of Maryland and the 16th-largest school district in the nation. ...

2011-04-19T23:59:59.000Z

150

EIS-0473: DOE Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the...

151

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project...

152

Certification Framework Based on Effective Trapping for Geologic Carbon Sequestration  

E-Print Network (OSTI)

Science, 52, 93- 125, 2005. RRC (Railroad Commission ofFort Bend County, Texas, 1991. RRC Well Database, http://HMR HS MGD mpg Mt NEE NSE RRC SGR TDS UIC US (U.S. ) USDW

Oldenburg, Curtis M.

2009-01-01T23:59:59.000Z

153

Secondary natural gas recovery: Targeted applications for infield reserve growth in midcontinent reservoirs, Boonsville Field, Fort Worth Basin, Texas. Topical report, May 1993--June 1995  

SciTech Connect

The objectives of this project are to define undrained or incompletely drained reservoir compartments controlled primarily by depositional heterogeneity in a low-accommodation, cratonic Midcontinent depositional setting, and, afterwards, to develop and transfer to producers strategies for infield reserve growth of natural gas. Integrated geologic, geophysical, reservoir engineering, and petrophysical evaluations are described in complex difficult-to-characterize fluvial and deltaic reservoirs in Boonsville (Bend Conglomerate Gas) field, a large, mature gas field located in the Fort Worth Basin of North Texas. The purpose of this project is to demonstrate approaches to overcoming the reservoir complexity, targeting the gas resource, and doing so using state-of-the-art technologies being applied by a large cross section of Midcontinent operators.

Hardage, B.A.; Carr, D.L.; Finley, R.J.; Tyler, N.; Lancaster, D.E.; Elphick, R.Y.; Ballard, J.R.

1995-07-01T23:59:59.000Z

154

San Diego County - Design Standards for County Facilities | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Standards for County Facilities Design Standards for County Facilities San Diego County - Design Standards for County Facilities < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Energy Sources Solar Wind Other Program Info State California Program Type Energy Standards for Public Buildings Provider San Diego County The San Diego County Board of Supervisors established design standards for county facilities and property. Among other requirements, the policy requires that all new county buildings or major building renovations obtain U.S. Green Building Council (USGBC) LEED Building Certification.

155

Fort Stewart integrated resource assessment. Volume 3: Resource assessment  

SciTech Connect

The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

156

Geology of the Cove Fort-Sulphurdale KGRA  

DOE Green Energy (OSTI)

The Cove Fort-Sulphurdale Known Geothermal Resource Area (KGRA) is located on the northwestern margin of the Marysvale volcanic field in southwestern Utah. The geology of the KGRA is dominated by lava flows and ash-flow tuffs of late Oligocene to mid-Miocene age that were deposited on faulted sedimentary rocks of Paleozoic to Mesozoic age. The geothermal system of the Cove Fort-Sulphurdale KGRA is structurally controlled by normal faults. High-angle faults control fluid flow within the geothermal reservoir, while the gravitational glide blocks provide an impermeable cap for the geothermal system in the central part of the field. Surficial activity occurring to the north and south of the glide blocks is characterized by the evolution of hydrogen sulfide and deposition of native sulphur. Intense acid alteration of the aluvium, resulting from downward migration of sulphuric acid, has left porous siliceous residues that retain many of the original sedimentary structures. Detailed logs of Union Oil Company drill holes Forminco No. 1, Utah State 42-7, and Utah State 31-33 are included.

Moore, J.N.; Samberg, S.M.

1979-05-01T23:59:59.000Z

157

Solar Energy Development Assistance for Fort Hunter Liggett  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory provided assistance to Fort Hunter Liggett to determine the opportunities for solar energy development on the site. Increasing use of renewable energy is mandated by several executive orders and legislation. Fort Hunter Liggett has many attributes that enhance its suitability for renewable energy development. First, the site is located south of San Francisco in a remote portion of the costal foothills. Brush and forest fires are frequent and often result in power outages, which subsequently impacts the sites training mission. In addition, the sites blended electric rate during fiscal year (FY) 2010 was high at 12 /kWh. Lastly, the solar resource is moderately high; the site receives nearly 5.7 kWh/m2/day on a south facing, latitude-tilted surface. In light of these factors, the site is a clear candidate for a solar photovoltaic array. Prior to Pacific Northwest National Laboratorys (PNNL) involvement, the site secured funding for a 1 megawatt (MW) photovoltaic (PV) array that will also provide shading for site vehicles. To best implement this project, PNNL conducted a site visit and was tasked with providing the site technical guidance and support regarding module selection, array siting, and other ancillary issues.

Russo, Bryan J.; Hoffman, Michael G.; Chvala, William D.

2011-03-30T23:59:59.000Z

158

Fort Drum integrated resource assessment. Volume 3, Resource assessment  

Science Conference Proceedings (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

159

Strategic Energy Management Plan For Fort Buchanan, Puerto Rico  

SciTech Connect

This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

Parker, Steven A.; Hunt, W. D.

2001-10-31T23:59:59.000Z

160

Harris County - LEED Requirement for County Buildings | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Harris County - LEED Requirement for County Buildings Harris County - LEED Requirement for County Buildings Harris County - LEED Requirement for County Buildings < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Texas Program Type Energy Standards for Public Buildings Provider Harris County In 2009, the Harris County Commissioners Court approved a measure that requires all new county buildings to meet minimum LEED certification standards. Buildings do not have to register with the the U.S. Green Building Council. The Harris County Facilities and Property Management (FPM) Division also requires all county buildings to meet minimum energy efficiency and sustainability measures, as described in the

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Frederick County- Green Building Program  

Energy.gov (U.S. Department of Energy (DOE))

Frederick County administers a green building program. It has two goals: (1) to ensure that County building projects implement strategies that enhance environmental performance and fiscal...

162

Thermal design of the fast-on-orbit recording of transient events (FORTE) satellite  

SciTech Connect

Analytical tools were used to design a thermal control system for the FORTE satellite. An overall spacecraft thermal model was developed to provide boundary temperatures for detailed thermal models of the FORTE instruments. The thermal design will be presented and thermal model results discussed.

Akau, R.L.; Behr, V.L. [Sandia National Labs., Albuquerque, NM (United States); Whitaker, R. [Los Alamos National Lab., NM (United States)

1994-10-01T23:59:59.000Z

163

Light-bending tests of Lorentz invariance  

E-Print Network (OSTI)

Classical light bending is investigated for weak gravitational fields in the presence of hypothetical local Lorentz violation. Using an effective field theory framework that describes general deviations from local Lorentz invariance, we derive a modified deflection angle for light passing near a massive body. The results include anisotropic effects not present for spherical sources in General Relativity as well as Weak Equivalence Principle violation. We develop an expression for the relative deflection of two distant stars that can be used to analyze data in past and future solar-system observations. The measurement sensitivities of such tests to coefficients for Lorentz violation are discussed.

Rhondale Tso; Quentin G. Bailey

2011-08-10T23:59:59.000Z

164

Controlled Source Audio MT At Cove Fort Area - Liquid (Combs 2006) | Open  

Open Energy Info (EERE)

Cove Fort Area - Liquid (Combs 2006) Cove Fort Area - Liquid (Combs 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Controlled Source Audio MT At Cove Fort Area (Combs 2006) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Controlled Source Audio MT Activity Date Usefulness not indicated DOE-funding Unknown Notes "SP, dipole-dipole resistivity, CSAMT; sufficient electrical data are available. Reservoir model?" References Jim Combs (1 January 2006) Historical Exploration And Drilling Data From Geothermal Prospects And Power Generation Projects In The Western United States Retrieved from "http://en.openei.org/w/index.php?title=Controlled_Source_Audio_MT_At_Cove_Fort_Area_-_Liquid_(Combs_2006)&oldid=598122"

165

Direct-Current Resistivity At Cove Fort Area - Liquid (Combs 2006) | Open  

Open Energy Info (EERE)

Direct-Current Resistivity At Cove Fort Area - Liquid (Combs 2006) Direct-Current Resistivity At Cove Fort Area - Liquid (Combs 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity At Cove Fort Area (Combs 2006) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes "SP, dipole-dipole resistivity, CSAMT; sufficient electrical data are available. Reservoir model?" References Jim Combs (1 January 2006) Historical Exploration And Drilling Data From Geothermal Prospects And Power Generation Projects In The Western United States Retrieved from "http://en.openei.org/w/index.php?title=Direct-Current_Resistivity_At_Cove_Fort_Area_-_Liquid_(Combs_2006)&oldid=598123

166

Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et  

Open Energy Info (EERE)

Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et Direct-Current Resistivity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects Retrieved from "http://en.openei.org/w/index.php?title=Direct-Current_Resistivity_Survey_At_Cove_Fort_Area_-_Vapor_(Warpinski,_Et_Al.,_2004)&oldid=598134"

167

Direct-Current Resistivity At Cove Fort Area - Liquid (Warpinski, Et Al.,  

Open Energy Info (EERE)

Direct-Current Resistivity At Cove Fort Area - Liquid (Warpinski, Et Al., Direct-Current Resistivity At Cove Fort Area - Liquid (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects Retrieved from "http://en.openei.org/w/index.php?title=Direct-Current_Resistivity_At_Cove_Fort_Area_-_Liquid_(Warpinski,_Et_Al.,_2004)&oldid=598125" Categories: Exploration Activities

168

Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2004) | Open Energy  

Open Energy Info (EERE)

Cove Fort Area (Warpinski, Et Al., 2004) Cove Fort Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects Retrieved from "http://en.openei.org/w/index.php?title=Ground_Magnetics_At_Cove_Fort_Area_(Warpinski,_Et_Al.,_2004)&oldid=598118" Categories: Exploration Activities DOE Funded Activities What links here Related changes Special pages

169

EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Combined Power and Biomass Heating System, Fort Yukon, 2: Combined Power and Biomass Heating System, Fort Yukon, Alaska EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska SUMMARY DOE (lead agency), Denali Commission (cooperating agency) and USDA Rural Utilities Services (cooperating agency) are proposing to provide funding to support the final design and construction of a biomass combined heat and power plant and associated district heating system to the Council of Athabascan Tribal Governments and the Gwitchyaa Zhee Corporation. The proposed biomass district heating system would be located in Fort Yukon Alaska. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD May 6, 2013 EA-1922: Finding of No Significant Impact Combined Power and Biomass Heating System, Fort Yukon, Alaska

170

City of Fort Collins - Green Building Requirement for City-Owned Buildings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fort Collins - Green Building Requirement for City-Owned Fort Collins - Green Building Requirement for City-Owned Buildings City of Fort Collins - Green Building Requirement for City-Owned Buildings < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Water Heating Wind Program Info State Colorado Program Type Energy Standards for Public Buildings Provider The City of Fort Collins The City Council of Fort Collins passed a resolution in September 2006, establishing green building goals for new city-owned buildings of 5,000 square feet or more. New buildings must be designed and constructed to

171

EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Combined Power and Biomass Heating System, Fort Yukon, 2: Combined Power and Biomass Heating System, Fort Yukon, Alaska EA-1922: Combined Power and Biomass Heating System, Fort Yukon, Alaska SUMMARY DOE (lead agency), Denali Commission (cooperating agency) and USDA Rural Utilities Services (cooperating agency) are proposing to provide funding to support the final design and construction of a biomass combined heat and power plant and associated district heating system to the Council of Athabascan Tribal Governments and the Gwitchyaa Zhee Corporation. The proposed biomass district heating system would be located in Fort Yukon Alaska. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD May 6, 2013 EA-1922: Finding of No Significant Impact Combined Power and Biomass Heating System, Fort Yukon, Alaska

172

Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2004) | Open  

Open Energy Info (EERE)

Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2004) Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects Retrieved from "http://en.openei.org/w/index.php?title=Ground_Gravity_Survey_At_Cove_Fort_Area_(Warpinski,_Et_Al.,_2004)&oldid=598130" Categories: Exploration Activities DOE Funded Activities

173

Regional Lead Agents and County Coordinators 2011 RESPONSIBILITY NAME COUNTY  

E-Print Network (OSTI)

Coordinator Jay Crouch Newberry County Coordinator Vicky Bertagnolli Aiken REGION 8 Regional Lead Karissa

Bolding, M. Chad

174

Fort Collins Utilities - Home Efficiency Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Efficiency Program Home Efficiency Program Fort Collins Utilities - Home Efficiency Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Cooling Sealing Your Home Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Water Heating Windows, Doors, & Skylights Program Info State Colorado Program Type Utility Rebate Program Rebate Amount Lighting: See Program Website Air Sealing: $200 - $500 Conditioned Crawl Space Insulation: $0.30/sq ft. - $0.75/sq ft. Cold Crawl Space: $0.30/sq ft. - $0.45/sq ft. Basement Wall Insulation:$0.50/sq ft. - $1.00/sq ft., Cantilever Floor Insulation: $0.50/sq ft. - $0.75/sq ft. Frame Floor Insulation Over Garage: $0.50/sq ft. - $0.75/sq ft.

175

United States Army; Fort Gordon, Georgia, Range Control Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT DRAFT Joint Standard Operating Procedures (JSOP) For Military Training at the Savannah River Site August 2011 U.S. Department of Energy, Savannah River Operations Office, Savannah River Site And U.S. Department Of The Army, Fort Gordon, Georgia DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 2 Chapter 1 General, 1.1 Purpose, page 8 1.2 Scope, page 8 1.3 Explanation of abbreviation and terms, page 8 1.4 Applicability, page 8 1.5 Deviations and Amendments, page 8 Chapter 2 Responsibilities 2.1 DOE-Savannah River Point of Contact (DOE-SR POC), page 10 2.2 DOE-Assistant Manager for Integration and Planning (AMIP), page 10 2.3 SRNS Interface Management Office, page 10 2.4 Directorate of Plans, Training, Mobilization, and Security (DPTMS), Page 10

176

Fort Collins Utilities - Commercial and Industrial Energy Efficiency Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial and Industrial Energy Commercial and Industrial Energy Efficiency Rebate Program Fort Collins Utilities - Commercial and Industrial Energy Efficiency Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Other Sealing Your Home Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Insulation Windows, Doors, & Skylights Maximum Rebate Building Tune Up: $50,000 Program Info State Colorado Program Type Utility Rebate Program Rebate Amount Roof Top A/C: $100 - $150, plus $5 for each 0.1 SEER or IEER above minimum requirement Variable Frequency Drives: $85 - $120/HP Packaged Terminal A/C: $50, plus $5 for each 0.1 EER above minimum

177

Fort Worth, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Worth, Texas: Energy Resources Worth, Texas: Energy Resources (Redirected from Fort Worth, TX) Jump to: navigation, search Equivalent URI DBpedia Coordinates 32.725409°, -97.3208496° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.725409,"lon":-97.3208496,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

178

Analysis of natural gas supply strategies at Fort Drum  

SciTech Connect

This analysis investigates strategies for Fort Drum to acquire a reliable natural gas supply while reducing its gas supply costs. The purpose of this study is to recommend an optimal supply mix based on the life-cycle costs of each strategy analyzed. In particular, this study is intended to provide initial guidance as to whether or not the building and operating of a propane-air mixing station is a feasible alternative to the current gas acquisition strategy. The analysis proceeded by defining the components of supply (gas purchase, gas transport, supplemental fuel supply); identifying alternative options for each supply component; constructing gas supply strategies from different combinations of the options available for each supply component and calculating the life-cycle costs of each supply strategy under a set of different scenarios reflecting the uncertainty of future events.

Stucky, D.J.; Shankle, S.A.; Anderson, D.M.

1992-07-01T23:59:59.000Z

179

System specification for Fort Hood Solar Cogeneration Facility  

DOE Green Energy (OSTI)

The characteristics and design and environmental requirements are specified for a solar cogeneration facility at the Fort Hood Army Base in Killeen, Texas. Characteristics of the system and major elements are described, and applicable standards, codes, laws and regulations are listed. Performance requirements for the total system and for each individual subsystem are presented. Survival requirements are given for various environmental extremes, with consideration given to lightning protection and effects of direct or adjacent lightning strikes. Air quality control standards are briefly mentioned. The facility operates in two principal modes: energy collection and energy utilization. The plant is capable of operating in either mode independently or in both modes simultaneously. The system is also operational in transitional and standby/inactive modes. (LEW)

Not Available

1981-05-01T23:59:59.000Z

180

Preliminary assessment of Fort Hood solar cogeneration plant performance  

DOE Green Energy (OSTI)

An analysis has been performed to enable a preliminary assessment of the performance that can be expected of a solar thermal cogeneration system designed to serve a selected group of buildings at Fort Hood, Texas. A central receiver system utilizing a molten salts mixture as the receiver coolant, heat transfer fluid, and storage medium is assumed. The system is to supply a large share of the space heating, air conditioning, domestic hot water, and electricity needs of a 20-building Troop Housing Complex. Principal energy loads are graphed and tabulated, and the principal electric parasitic loads are tabulated and the methodology by which they are estimated is reviewed. The plant model and the performance calculations are discussed. Annual energy displacement results are given. (LEW)

Ator, J.

1981-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Fort Hood solar cogeneration facility conceptual design study  

DOE Green Energy (OSTI)

A study is done on the application of a tower-focus solar cogeneration facility at the US Fort Hood Army Base in Killeen, Texas. Solar-heated molten salt is to provide the steam for electricity and for room heating, room cooling, and domestic hot water. The proposed solar cogeneration system is expected to save the equivalent of approximately 10,500 barrels of fuel oil per year and to involve low development risks. The site and existing plant are described, including the climate and plant performance. The selection of the site-specific configuration is discussed, including: candidate system configurations; technology assessments, including risk assessments of system development, receiver fluids, and receiver configurations; system sizing; and the results of trade studies leading to the selection of the preferred system configuration. (LEW)

Not Available

1981-05-01T23:59:59.000Z

182

Suffolk County - LEED Program for County Construction | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suffolk County - LEED Program for County Construction Suffolk County - LEED Program for County Construction Suffolk County - LEED Program for County Construction < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State New York Program Type Energy Standards for Public Buildings Provider Suffolk County In 2006, the Suffolk County Legislature enacted Resolution No. 126-2006, creating the Leadership in Energy and Environment Design (LEED) Program for county construction projects. The program requirements were revised in 2008 (Resolution No. 551-2008), and again in 2011 (Resolution No. 458-2011). The program requires the County Department of Public Works to apply the LEED

183

Tension and Flex Bending Fatigue of Superelastic Nitinol  

Science Conference Proceedings (OSTI)

Symposium, Shape Memory Alloys. Presentation Title, Tension and Flex Bending Fatigue of Superelastic Nitinol. Author(s), John R Lewandowski, Brian Benini,...

184

The Research on Controlling the Pre-Bending Deformation before ...  

Science Conference Proceedings (OSTI)

The straightness and residual stresses of the rail after straightening are affected by the bending deformation during cooling before straightening. By analyzing...

185

Big Bend, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bureau 2005 Place to 2006 CBSA Retrieved from "http:en.openei.orgwindex.php?titleBigBend,California&oldid227746" Categories: Places Stubs Cities What links here Related...

186

Warm Bending Magnesium Sheet for Automotive Closure Panels  

Science Conference Proceedings (OSTI)

For automotive production, hemming equipment would be augmented with a rapid heating technology to locally heat the bend region, complete the hem and...

187

DISTRIBUTION OF THE SYNCHROTRON RADIATION FROM BENDING MAGNETS  

NLE Websites -- All DOE Office Websites (Extended Search)

DISTRIBUTION OF THE SYNCHROTRON RADIATION FROM BENDING MAGNETS LS-91 S. Kim November 1988 NO DISTRIBUTION REFERENCE ONLY This note describes the distribution of the synchrotron...

188

SRI CAT Section 1 bending magnet beamline description  

SciTech Connect

This report discusses: APS bending magnet source; beamline layout; beamline optical components; beamline operation; time-resolved studies station; polarization studies station; and commissioning and operational schedule.

Srajer, G.; Rodricks, B.; Assoufid, L.; Mills, D.M.

1994-03-10T23:59:59.000Z

189

Coyotes in Cook County  

NLE Websites -- All DOE Office Websites (Extended Search)

Coyotes in Cook County Coyotes in Cook County Nature Bulletin No. 2 Forest Preserve District of Cook County -- July 31, 1969 George W. Dunne, President Roland F. Eisenbeis, Superintendent of Conversation COYOTES IN COOK COUNTY One winter night, a Forest Preserve Ranger heard the yapping howl of some animal that made his hair stand on end. A few days later, a farmer in the Sag valley saw what appeared to be a wolf lope across a road. Finally, the ranger, concealed within sight of a faint path apparently used by wild dogs or foxes, shot a coyote. The little bunch of black bristles at the base of its tail, covering a scent gland beneath the skin identified it as being of the wolf family. The animal was sent to the Illinois Natural History Survey, at Urbana, where it was pronounced to be a prairie wolf (also known as the "brush" wolf). In the west it is generally known by its Spanish name: coyote.

190

County\paa  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eureka County Eureka County Yucca Mountain Information Office P.O. Box 257 Eureka, Nevada 89316 (702) 237-5372 FAX (702) 237-5708 January 29, 1998 U.S. Department of Energy Office of General Counsel, GC-52 1000 Independence Ave. SW Washington DC 20585 RE: Price-Anderson Act To Whom It May Concern: In response the Federal Register notice of December 31, 1997 requesting public comments on the Price-Anderson Act (PAA), Eureka County, Nevada is submitting these comments. Eureka County is one of the affected units of local government under the Nuclear Waste Policy Act of 1982 as amended. With potential socioeconomic, environmental and transportation impacts, we have a strong interest in oversight of the DOE's Yucca Mountain project activities, including transportation impacts and

191

County Wind Ordinance Standards  

Energy.gov (U.S. Department of Energy (DOE))

[http://www.leginfo.ca.gov/pub/09-10/bill/asm/ab_0001-0050/ab_45_bill_200... Assembly Bill 45] of 2009 authorized counties to adopt ordinances to provide for the installation of small wind systems ...

192

Caroline County- Wind Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance amends Chapter 175 of the Code of Public Local Laws of Caroline County, Maryland to provide for the erection, maintenance, and operation of small wind energy systems, as well as...

193

RECIPIENT:Placer County  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENfCENTER .. NEAnE:'l'ERlVIIN).'I:rQ1"l PROJECT TITLE: Placer County Biomass Utilization Pilot Project Page 1 of2 . .. . W STATE:CA Funding Opportunity...

194

Property:County | Open Energy Information  

Open Energy Info (EERE)

County County Jump to: navigation, search Property Name County Property Type String Description County Name Pages using the property "County" Showing 25 pages using this property. (previous 25) (next 25) A Akutan Geothermal Project + Aleutians East Borough, AK + Alligator Geothermal Geothermal Project + White Pine County, NV + Alum Geothermal Project + Esmerelda County, NV + Aurora Geothermal Project + Mineral County, NV + B Bald Mountain Geothermal Project + Lassen County, CA + Baltazor Springs Geothermal Project + Humboldt County, NV + Barren Hills Geothermal Project + Lyon, NV + Black Rock I Geothermal Project + Imperial County, OR + Black Rock II Geothermal Project + Imperial County, CA + Black Rock III Geothermal Project + Imperial County, CA +

195

APS Bending Magnet X-rays and  

NLE Websites -- All DOE Office Websites (Extended Search)

Irradiation of Nd-Fe-B Permanent Magnets with Irradiation of Nd-Fe-B Permanent Magnets with APS Bending Magnet X-rays and 60 Co γ-rays J. Alderman and P.K. Job APS Operations Division Advanced Photon Source J. Puhl Ionizing Radiation Division National Institute of Standards and Technology June 2000 Table of Contents Introduction Radiation-Induced Demagnetization of Permanent Magnets Resources Required γ-ray Irradiation Results and Analysis of γ-ray Irradiation X-ray Irradiation Results and Analysis of X-ray Irradiation Summary and Conclusions Acknowledgements References Tables and Figures Introduction The Advanced Photon Source (APS), as well as other third-generation synchrotron light sources, uses permanent magnets in the insertion devices to produce x-rays for scientific

196

Bend, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Bend, Oregon: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 44.0581728°, -121.3153096° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.0581728,"lon":-121.3153096,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

197

Direct-Current Resistivity Survey At Cove Fort Area - Liquid (Combs 2006) |  

Open Energy Info (EERE)

- Liquid (Combs 2006) - Liquid (Combs 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Cove Fort Area (Combs 2006) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes "SP, dipole-dipole resistivity, CSAMT; sufficient electrical data are available. Reservoir model?" References Jim Combs (1 January 2006) Historical Exploration And Drilling Data From Geothermal Prospects And Power Generation Projects In The Western United States Retrieved from "http://en.openei.org/w/index.php?title=Direct-Current_Resistivity_Survey_At_Cove_Fort_Area_-_Liquid_(Combs_2006)&oldid=598127"

198

Geographic Information System At Cove Fort Area (Nash, Et Al., 2002) | Open  

Open Energy Info (EERE)

Nash, Et Al., 2002) Nash, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Cove Fort Area (Nash, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Geographic Information System Activity Date Usefulness not indicated DOE-funding Unknown Notes An example, shown in Figure 1, shows results from the classification of big sagebrush (Artimesia tridentata) spectra, acquired over the Cove Fort-Sulphurdale, Utah thermal anomaly, in relation to geology References Gregory D. Nash, Christopher Kesler, Michael C. Adam (2002) Geographic Information Systems- Tools For Geotherm Exploration, Tracers Data Analysis, And Enhanced Data Distribution, Visualization, And

199

Geographic Information System At Cove Fort Area - Vapor (Nash, Et Al.,  

Open Energy Info (EERE)

Nash, Et Al., Nash, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Cove Fort Area (Nash, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Geographic Information System Activity Date Usefulness not indicated DOE-funding Unknown Notes An example, shown in Figure 1, shows results from the classification of big sagebrush (Artimesia tridentata) spectra, acquired over the Cove Fort-Sulphurdale, Utah thermal anomaly, in relation to geology References Gregory D. Nash, Christopher Kesler, Michael C. Adam (2002) Geographic Information Systems- Tools For Geotherm Exploration, Tracers Data Analysis, And Enhanced Data Distribution, Visualization, And Management

200

Fuel selection study for Fort Leonard Wood, Missouri. Volume 2. Final report  

SciTech Connect

The objectives of the Fuel Selection Study for Fort Leonard Wood, Missouri were: (1) to evaluate specified sources of heating energy - electric or fuel oil, and the necessary associated conversion work for meeting the heating requirements of selected buildings at Fort Leonard Wood, Missouri; and (2) to determine the impact on energy usage and cost savings which would result from increasing insulation levels in the building under review. The buildings considered in this study included 2,862 family housing units, 5 Bachelor Officers' Quarters, an Enlisted Women's Barracks, the Medical Detachment Building, and the Heating Plant supporting the main Fort laundry.

1975-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Fuel selection study for Fort Leonard Wood, Missouri. Volume 1. Final report  

SciTech Connect

The objectives of the Fuel Selection Study for Fort Leonard Wood, Missouri were: (1) to evaluate specified sources of heating energy - electric or fuel oil, and the necessary associated conversion work for meeting the heating requirements of selected buildings at Fort Leonard Wood, Missouri; and (2) to determine the impact on energy usage and cost savings which would result from increasing insulation levels in the building under review. The buildings considered in this study included 2,862 family housing units, 5 Bachelor Officers' Quarters, an Enlisted Women's Barracks, the Medical Detachment Building, and the Heating Plant supporting the main Fort laundry.

1975-05-01T23:59:59.000Z

202

Property:FIPS County Code | Open Energy Information  

Open Energy Info (EERE)

FIPS County Code FIPS County Code Jump to: navigation, search This is a property of type String. Pages using the property "FIPS County Code" Showing 25 pages using this property. (previous 25) (next 25) A Abbeville County, South Carolina + 001 + Acadia Parish, Louisiana + 001 + Accomack County, Virginia + 001 + Ada County, Idaho + 001 + Adair County, Iowa + 001 + Adair County, Kentucky + 001 + Adair County, Missouri + 001 + Adair County, Oklahoma + 001 + Adams County, Colorado + 001 + Adams County, Idaho + 003 + Adams County, Illinois + 001 + Adams County, Indiana + 001 + Adams County, Iowa + 003 + Adams County, Mississippi + 001 + Adams County, Nebraska + 001 + Adams County, North Dakota + 001 + Adams County, Ohio + 001 + Adams County, Pennsylvania + 001 +

203

Better Buildings Neighborhood Program: Sonoma County  

NLE Websites -- All DOE Office Websites (Extended Search)

County on Twitter Bookmark Better Buildings Neighborhood Program: Sonoma County on Google Bookmark Better Buildings Neighborhood Program: Sonoma County on Delicious Rank Better...

204

Resistivity Log At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Resistivity Log At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Single-Well and Cross-Well Resistivity At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Single-Well and Cross-Well Resistivity Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Resistivity_Log_At_Fort_Bliss_Area_(DOE_GTP)&oldid=689878" Categories: Exploration Activities

205

Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) | Open Energy  

Open Energy Info (EERE)

Warpinski, Et Al., 2002) Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal Resource Exploration And Definition Project

206

Berkeley Lab Facilitates 18.6-megawatt PV facility at Army's Fort  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab Facilitates 18.6-megawatt PV facility at Army's Fort Berkeley Lab Facilitates 18.6-megawatt PV facility at Army's Fort Detrick, Maryland December 2013 The Army, on Friday November 29, announced a notice of intent to award a contract to build an 18.6-megawatt solar photovoltaic (PV) facility at Fort Detrick, in Frederick, Maryland. This action will help the service meet its goal of deploying one gigawatt of renewable energy by 2025. The selected contractor is Framingham, Mass.-based Ameresco. Lawrence Berkeley National Laboratory (Berkeley Lab), through its Environmental Energy Technologies Division, provided essential technical services, over a span of two years, to make this project happen. Supported by the Federal Energy Management Program, Berkeley Lab renewable power expert Gerald Robinson provided the Army, Fort Detrick staff, its Energy

207

Ground Gravity Survey At Cove Fort Area (Toksoz, Et Al, 2010) | Open Energy  

Open Energy Info (EERE)

Cove Fort Area (Toksoz, Et Al, 2010) Cove Fort Area (Toksoz, Et Al, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Toksoz, Et Al, 2010) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes We have collected various geophysical data around the geothermal field, including heat flow, gravity, MT, seismic surface wave phase and group velocity maps, seismic body wave travel time data and full seismic waveforms. All of these geophysical data sets have different strengths on characterizing subsurface structures and properties. Combining these data through a coordinated analysis and, when possible, by joint inversion

208

Static Temperature Survey At Fort Bliss Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Fort Bliss Area (Combs, Et Al., 1999) Fort Bliss Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Static Temperature Survey At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Static Temperature Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes Three principal types of data were obtained from this drilling project: core samples of the lithology penetrated by the holes, records of drilling behavior (such as water level in the hole, changes in rate of penetration etc.), and multiple temperature logs (both during and after drilling) in each well. A suite of geophysical logs (gamma ray, neutron, sonic, and resistivity) was also run after completion of drilling.

209

Modeling-Computer Simulations At Cove Fort Area (Toksoz, Et Al, 2010) |  

Open Energy Info (EERE)

Modeling-Computer Simulations At Cove Fort Area (Toksoz, Et Al, 2010) Modeling-Computer Simulations At Cove Fort Area (Toksoz, Et Al, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Cove Fort Area (Toksoz, Et Al, 2010) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Modeling-Computer Simulations Activity Date Usefulness not indicated DOE-funding Unknown Notes We have collected various geophysical data around the geothermal field, including heat flow, gravity, MT, seismic surface wave phase and group velocity maps, seismic body wave travel time data and full seismic waveforms. All of these geophysical data sets have different strengths on characterizing subsurface structures and properties. Combining these data through a coordinated analysis and, when possible, by joint inversion

210

2010 DOE National Science Bowl® Photos - Spanish Fort Middle School |  

Office of Science (SC) Website

Spanish Fort Middle School Spanish Fort Middle School National Science Bowl® (NSB) NSB Home About National Science Bowl Contacts Regional Science Bowl Coordinators National Science Bowl FAQ's Alumni Past National Science Bowl Winners Past National Science Bowl Photos National Science Bowl Logos High School Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov 2010 National Science Bowl Photos 2010 DOE National Science Bowl® Photos - Spanish Fort Middle School Print Text Size: A A A RSS Feeds FeedbackShare Page The Spanish Fort Middle School team, from Spanish Court, AL, explores the

211

Thermal Gradient Holes At Cove Fort Area (Warpinski, Et Al., 2002) | Open  

Open Energy Info (EERE)

Et Al., 2002) Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Thermal Gradient Holes Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. Drilling of the test well was completed in the fall of 2001 and results are currently being evaluated. The total depth of the well is 598 m with a

212

Poudre High School From Fort Collins , Colorado Wins U.S. Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Poudre High School From Fort Collins , Colorado Wins U.S. Poudre High School From Fort Collins , Colorado Wins U.S. Department of Energy National Science Bowl® Poudre High School From Fort Collins , Colorado Wins U.S. Department of Energy National Science Bowl® April 30, 2007 - 12:45pm Addthis WASHINGTON, DC - Poudre High School from Fort Collins, Colorado won the 2007 U.S. Department of Energy (DOE) National Science Bowl® for high school students today at the National 4-H Youth Conference Center. Poudre High School beat State College Area High School from State College, Pennsylvania in the national championship match. Teams representing 64 high schools from across the United States competed in the National Finals. Members of the winning team include Patrick Chaffey, Sam Elder, Winston Gao, Sam Sun, Logan Wright and coach Jack Lundt. The team won a science

213

DOE - Office of Legacy Management -- Reactor Site - Fort Belvoir - VA 0-02  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactor Site - Fort Belvoir - VA Reactor Site - Fort Belvoir - VA 0-02 FUSRAP Considered Sites Site: REACTOR SITE - FORT BELVOIR (VA.0-02 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Fort Belvoir , Virginia VA.0-02-1 Evaluation Year: 1987 VA.0-02-1 Site Operations: No evidence of AEC involvement with reactor operations. AEC conducted health and safety inspections of this site. Probably a licensed operation. VA.0-02-1 Site Disposition: Eliminated - Referred to DOD VA.0-02-1 Radioactive Materials Handled: Reactor fuel Primary Radioactive Materials Handled: Reactor Fuel Radiological Survey(s): Health and safety inspections VA.0-02-1 Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD VA.0-02-1

214

Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) | Open  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal Resource Exploration And Definition Project

215

Magnetotellurics At Cove Fort Area (Toksoz, Et Al, 2010) | Open Energy  

Open Energy Info (EERE)

Cove Fort Area (Toksoz, Et Al, 2010) Cove Fort Area (Toksoz, Et Al, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Magnetotellurics At Cove Fort Area (Toksoz, Et Al, 2010) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Magnetotellurics Activity Date Usefulness not indicated DOE-funding Unknown Notes We have collected various geophysical data around the geothermal field, including heat flow, gravity, MT, seismic surface wave phase and group velocity maps, seismic body wave travel time data and full seismic waveforms. All of these geophysical data sets have different strengths on characterizing subsurface structures and properties. Combining these data through a coordinated analysis and, when possible, by joint inversion

216

Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) | Open  

Open Energy Info (EERE)

Vapor (Warpinski, Et Al., 2002) Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. References N. R. Warpinski, A. R. Sattlerl, D. A. Sanchez (2002) Geothermal Resource Exploration And Definition Project

217

Fort Collins, Colorado on Track to Net Zero | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fort Collins, Colorado on Track to Net Zero Fort Collins, Colorado on Track to Net Zero Fort Collins, Colorado on Track to Net Zero November 18, 2010 - 2:23pm Addthis Ian Hamos What does this mean for me? Using electricity during "peak periods" requires more fuel and creates more emissions to produce the same amount as energy as non-peak periods. By integrating demand-side resources, distributed and renewable power sources, and smart grid technologies, Fort Collins is creating a net Zero Energy District (ZED) -- potentially creating hundreds of permanent jobs and setting an example for cities nationwide. Just like traffic has peaks at rush hour, electricity demand rises and falls at particular times of day. During electricity's peak periods, power plants turn on gas-fired turbines and other supplemental energy

218

A SUMMARY OF COAL IN THE FORT UNION FORMATION (TERTIARY), BIGHORN BASIN,  

E-Print Network (OSTI)

Chapter SB A SUMMARY OF COAL IN THE FORT UNION FORMATION (TERTIARY), BIGHORN BASIN, WYOMING assessment of selected Tertiary coal beds and zones in the Northern RockyMountains and Great Plains region, U...........................................................................................................................SB-1 Coal Production History

219

An Unusual Summertime Downslope Wind Event in Fort Collins, Colorado, on 3 July 1993  

Science Conference Proceedings (OSTI)

An unseasonal, severe downslope windstorm along the eastern foothills of the Colorado Rocky Mountains is described. The storm, which occurred on 3 July 1993, produced wind guts in Fort Collins, Colorado, over 40 m s?1 and resulted in extensive ...

William R. Cotton; John F. Weaver; Brian A. Beitler

1995-12-01T23:59:59.000Z

220

Fort Hood Solar Total Energy Project. Volume I. Executive summary. Final report  

DOE Green Energy (OSTI)

A summary of the history, design, performance, supporting activities, and management plans for the Solar Total Energy System for the troop housing complex at Fort Hood, Texas, is presented. (WHK)

None

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Reassembling the rolling bridge : an art gallery at Fort Point Channel, Boston  

E-Print Network (OSTI)

Spanning the Fort Point Channel for nearly a century, Boston's Rolling Bridge is a familiar landmark to many railway commuters and residents of the city. Its robust steel assembly, characterized by three anthropomorphic ...

Lim, Winston E

1996-01-01T23:59:59.000Z

222

Slim Holes At Fort Bliss Area (Combs, Et Al., 1999) | Open Energy  

Open Energy Info (EERE)

Fort Bliss Area (Combs, Et Al., 1999) Fort Bliss Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Slim Holes At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Slim Holes Activity Date Usefulness useful DOE-funding Unknown Notes When the U. S. Army was in the planning stages for a geothermal exploration program at Ft. Bliss, they approached the Geothermal Research Department for input on the structure of this progrm, this consultation led to a Work-for-Others (WFO) contract from the Army to Sandia for assistance on the exploratory holes. That assistance included consultation and dmection of drilling operations, numerous temperature logs during and after drilling, and project documentation. This report comprises a summary of

223

Gamma Log At Fort Bliss Area (Combs, Et Al., 1999) | Open Energy  

Open Energy Info (EERE)

Fort Bliss Area (Combs, Et Al., 1999) Fort Bliss Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Gamma Log At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Gamma Log Activity Date Usefulness not indicated DOE-funding Unknown Notes Three principal types of data were obtained from this drilling project: core samples of the lithology penetrated by the holes, records of drilling behavior (such as water level in the hole, changes in rate of penetration etc.), and multiple temperature logs (both during and after drilling) in each well. A suite of geophysical logs (gamma ray, neutron, sonic, and resistivity) was also run after completion of drilling. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr.,

224

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment  

Science Conference Proceedings (OSTI)

Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.

Not Available

1993-02-05T23:59:59.000Z

225

Habitat Restoration/Enhancement Fort Hall Reservation : 2008 Annual Report.  

Science Conference Proceedings (OSTI)

Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2008. Enhancement and protection included sloping, fencing and planting wetlands plugs at sites on Spring Creek (Head-waters). Many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). Physical sampling during 2008 included sediment and depth measurements (SADMS) in Spring Creek at the Car Removal site. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for 5 strata on Spring Creek. Water temperature and chemistry were monitored monthly on Spring Creek, Clear Creek, Diggie Creek, and Portneuf (Jimmy Drinks) and Blackfoot rivers. Fish population densities and biomass were sampled in five reservation streams which included nine sites. Sampling protocols were identical to methods used in past years. Numbers of fish in Spring Creek series remained relatively low, however, there was an increase of biomass overall since 1993. Salmonid fry densities were monitored near Broncho Bridge and were similar to 2006, and 2007, however, as in years past, high densities of macrophytes make it very difficult to see fry in addition to lack of field technicians. Mean catch rate by anglers on Bottoms streams stayed the same as 2007 at 1.5/hr. Numbers of fish larger than 18-inches caught by anglers increased from 2007 at .20 to .26/hr.

Osborne, Hunter [Shoshone Bannock Tribes

2009-07-23T23:59:59.000Z

226

Fort Stewart integrated resource assessment. Volume 1, Executive summary  

SciTech Connect

The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.

Larson, L.L.; Keller, J.M.

1993-10-01T23:59:59.000Z

227

Fort St. Vrain Decommissioning: Final Site Radiation Survey: Summary Report and Lessons Learned  

Science Conference Proceedings (OSTI)

This report describes the final step in the decommissioning process at Public Service Company of Colorado's (PSCo) Fort St. Vrain nuclear power plant. The final site radiation survey documents that all nuclear facility surfaces meet the established release limits for unrestricted use. The survey formed the legal basis for the termination of the Fort St. Vrain nuclear license, which occurred in August 1997. The lessons learned in this process will be valuable to other utilities with permanently shutdown p...

1998-02-13T23:59:59.000Z

228

Facility Energy Decision System (FEDS) Assessment Report for Fort Buchanan, Puerto Rico  

Science Conference Proceedings (OSTI)

This report documents the findings of the Facility Energy Decision System (FEDS) assessment at Fort Buchanan, Puerto Rico, by a team of PNNL engineers under contract to the Installation Management Agency (IMA) Southeast Region Office (SERO). Funding support was also provided by the Department of Energy's Federal Energy Management Program. The purpose of the assessment was to determine how energy is consumed at Fort Buchanan, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Chvala, William D.; Solana, Amy E.; Dixon, Douglas R.

2005-02-01T23:59:59.000Z

229

Snohomish County Biodiesel Project  

SciTech Connect

Snohomish County in western Washington State began converting its vehicle fleet to use a blend of biodiesel and petroleum diesel in 2005. As prices for biodiesel rose due to increased demand for this cleaner-burning fuel, Snohomish County looked to its farmers to ???¢????????grow???¢??????? this fuel locally. Suitable seed crops that can be crushed to extract oil for use as biodiesel feedstock include canola, mustard, and camelina. The residue, or mash, has high value as an animal feed. County farmers began with 52 acres of canola and mustard crops in 2006, increasing to 250 acres and 356 tons in 2008. In 2009, this number decreased to about 150 acres and 300 tons due to increased price for mustard seed.

Terrill Chang; Deanna Carveth

2010-02-01T23:59:59.000Z

230

MINERAL COUNTY COMMISSIONERS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Board of Board of MINERAL COUNTY COMMISSIONERS Telephone: 702-945-2446 Fax: 702-945-0706 P.O. Box 4150 Hawthorne, Nevada 89415 JACKIE WALLIS, Chairman GOVERNING BOARD FOR THE TOWNS OF DAN DILLARD, Vice Chairman HAWTHORNE, LUNING AND MINA BOB LYBARGER, Member LIQUOR BOARD GAMING BOARD U.S. Department of Energy Office of General Counsel, GC-52 1000 Independence Ave. S.W. Washington, DC 20585 Dear Sirs: Attached are the comments for modification of the Price-Anderson Act Notice of Inquiry(NOI) provided to the Board of Mineral County Commissioners, in a letter dated January

231

Arlington County - Green Building Incentive Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Savings Arlington County - Green Building Incentive Program Arlington County - Green Building Incentive Program...

232

Continuous Commissioning of the Dallas/Fort Worth International Airport  

E-Print Network (OSTI)

The DFW International Airport is one of the largest and busiest airports in the world. Located in North Texas, squarely between the cities of Dallas and Fort Worth, the DFW Airport not only serves a huge population in the North Texas area for domestic flights but also is a major airport for international flights. The Energy and Transportation Management (ETM) Department, at the Airport, is responsible for reducing energy within their facilities, and they are very aggressive in energy management. In recent years they have renovated or replaced much of the equipment in their central utilities plant and added a huge 90,000 ton-hr (316.5 MWh) chilled water thermal storage system. The electric bills, for the accounts managed by ETM, was $29 million (20 million) in 2007. Although the ETM staff had initiated many energy efficiency measures, they felt that the energy consuming systems could be optimized to realize additional energy and cost savings. The Energy Systems Laboratory was hired to apply the Continuous Commissioning (CC) process at the airport. Five projects have been identified to date including: 1. An energy audit and assessment of Terminal B and a lighting demonstration pilot project. 2. CC of the Consolidated Rent-A-Car Center. 3. CC of the Airport Administration Building. 4. CC of the new International Terminal D (on-going). 5. CC of the Utilities Plant, Energy Plaza (on-going). This paper will focus on the completed projects: the Consolidated Rent-A-Car Center, the Airport Administration Building, and the major on-going projects, CC of Terminal D and Energy Plaza.

Yazdani, B.; Schroeder, F.; Kramer, L.; Baltazar, J. C.; Turner, W. D.; Wei, G.; Deng, S.; Henson, R.; Dennis, J. R.; T., R.

2008-10-01T23:59:59.000Z

233

EA-1897: AltaRock's Newberry Volcano EGS Demonstration near Bend...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: AltaRock's Newberry Volcano EGS Demonstration near Bend, Oregon EA-1897: AltaRock's Newberry Volcano EGS Demonstration near Bend, Oregon Summary This EA evaluates the...

234

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Mohave County Wind Farm Project, Mohave County, Arizona 41: Mohave County Wind Farm Project, Mohave County, Arizona EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona Summary This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines.The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html. Public Comment Opportunities None available at this time. Documents Available for Download Draft EIS posted at http://www.blm.gov/az/st/en/prog/energy/wind/mohave/reports/DEIS.html.

235

Santa Clara County - Green Building Policy for County Government Buildings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Policy for County Government Green Building Policy for County Government Buildings Santa Clara County - Green Building Policy for County Government Buildings < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Water Heating Program Info State California Program Type Energy Standards for Public Buildings Provider Santa Clara County Executive's Office In February 2006, the Santa Clara County Board of Supervisors approved a Green Building Policy for all county-owned or leased buildings. The standards were revised again in September 2009. All new buildings over 5,000 square feet are required to meet LEED Silver

236

Property:Building/County | Open Energy Information  

Open Energy Info (EERE)

County County Jump to: navigation, search This is a property of type Page. County Pages using the property "Building/County" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + Stockholm County, Sweden + Sweden Building 05K0002 + Stockholm County, Sweden + Sweden Building 05K0003 + Stockholm County, Sweden + Sweden Building 05K0004 + Stockholm County, Sweden + Sweden Building 05K0005 + Stockholm County, Sweden + Sweden Building 05K0006 + Stockholm County, Sweden + Sweden Building 05K0007 + Stockholm County, Sweden + Sweden Building 05K0008 + Stockholm County, Sweden + Sweden Building 05K0009 + Stockholm County, Sweden + Sweden Building 05K0010 + Stockholm County, Sweden + Sweden Building 05K0011 + Stockholm County, Sweden +

237

Toledo Bend Project Joint Oper | Open Energy Information  

Open Energy Info (EERE)

Bend Project Joint Oper Bend Project Joint Oper Jump to: navigation, search Name Toledo Bend Project Joint Oper Place Texas Utility Id 19048 Utility Location Yes Ownership S NERC Location SERC NERC SERC Yes Operates Generating Plant Yes Activity Generation Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Toledo_Bend_Project_Joint_Oper&oldid=411678"

238

Microsoft Word - BigBendSootblowerPPA_Final_061306.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

34 Big Bend Power Station Neural Network-Sootblower Optimization A DOE Assessment June 2006 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory...

239

The Diffraction of Kelvin Waves and Bores at Coastal Bends  

Science Conference Proceedings (OSTI)

Bends in coastal mountain ranges may diffract propagating atmospheric Kelvin waves and trapped coastal currents. Analytic solutions exist for the diffraction of both linear Kelvin waves and linear nonrotating gravity waves. Within the context of ...

William C. Skamarock; Joseph B. Klemp; Richard Rotunno

1996-05-01T23:59:59.000Z

240

Water Reclamation and Reuse at Fort Carson: Best Management Practice Case Study #14 - Alternate Water Sources (Brochure)  

SciTech Connect

FEMP Water Efficiency Best Management Practice #14 Case Study: Overview of the water reclamation and reuse program at the U.S. Army's Fort Carson.

Not Available

2009-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Olivella Grooved Rectangle Beads from a Middle Holocene Site in the Fort Rock Valley, Northern Great Basin  

E-Print Network (OSTI)

Lake Fort Rock and other local sources. The primary culturalRock Valley currently receives no water from a perennial source.

Jenkins, Dennis L; Erlandson, Jon M

1996-01-01T23:59:59.000Z

242

Savings Report for the Fort Hood Army Base  

E-Print Network (OSTI)

This report presents electricity consumption and electric demand savings analysis for the Thermal Plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at Ft. Hood, a total of 21 sites. The savings analysis for the Thermal Plant is not completed due to lack of post-retrofit data and will be included in the report upon receiving more data from Fort Hood. The data used for savings calculations were collected through the synergistic loggers installed at the Thermal Plant and III Corp building and portable loggers attached to Watt-hour meters in selected buildings. For each site, the hourly data collected for the pre- and post periods are converted to daily usage and then modeled with ASHRAEs IMT change-point linear models. The electricity consumption savings is then calculated for the months post-retrofit data are available. The weather-independent analysis, which utilizes 24-hour profiles that were developed using ASHRAEs 1093-RP diversity factor procedures, combined with ASHRAEs IMT change-point linear models, are used to evaluate demand savings. In Section 1 of the report, savings summaries for the sites measured and all the sites are given. In summary, the total measured savings of 1,034,473 kWh for the measured period corresponds to 60.7% of the audit-estimated electricity savings. The total of the measured demand savings of 1,220 kW for the measured period corresponds to 37.2% of the audit-estimated savings. Both measured electricity and demand savings fall short of expectations. The projected annual savings, which include the projected annual measured savings for the sites measured and the stipulated annual savings for the sites not measured, to match the JCI estimates for all the 57 sites, is also presented in Section 1. 78.2% of the audit-estimated electricity savings and 72.0% of the audit-estimated demand savings could be achieved assuming that the sites not measured were achieving 100% of the audit-estimated savings. The detailed savings summary and the plots showing the savings analysis for each site are presented in Sections 2 to 22. An Appendix is also provided that includes the list of data files in the accompanying CDROM with this report.

Song, S.; Liu, Z.; Cho, S.; Baltazar-Cervantes, J. C.; Haberl, J. S.

2005-12-01T23:59:59.000Z

243

Habitat Restoration/Enhancement Fort Hall Reservation : 2001 Annual Report.  

DOE Green Energy (OSTI)

Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2001. Enhancement and protection included sloping, fencing and planting willows at sites on Diggie Creek, Clear Creek and Spring Creek. In addition, many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). In 2001, exclosure fences were erected on Diggie Creek (250 m barbed wire; (70 m jack), Wood Creek (500 m jack), Clear Creek (20 m jack), Ross Fork Creek (200 m jack), West Fork Creek (200 m jack)) and the Portneuf River (1 km barbed wire; 100 m jack). Jack and rail exclosure fences that had deteriorated over the past ten years were repaired at numerous areas throughout the Reservation. Physical sampling during 2001 included sediment and depth surveys (SADMS) in Big Jimmy Creek and Diggie Creek. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for eight and nine strata in the Big Jimmy and Diggie Creek, respectively. Baseline SADM data was collected in Diggie Creek to monitor the effects of bank sloping and revegetation on channel morphology and sediment levels through time. Water temperature was monitored (hourly) in Spring Creek, Clear Creek, Ross Fork Creek and Big Jimmy Creek. Biotic sampling included invertebrate sampling in the 200 and 300 series of Clear Creek. Fish population densities and biomass were sampled in Clear Creek 200 and 300 series. Sampling protocols were identical to methods used in past years. Numbers of fish in Clear Creek 300 series remained similar to 2000 while numbers of fish in Clear Creek 200 series dropped to near pre project levels. Salmonid fry densities were monitored near Broncho Bridge and were significantly higher than 2000. A mark-recapture study was initiated in spring 2001 to estimate numbers of spawning adults using the Head End of Spring Creek Mean catch rate by anglers on Bottoms streams increased from 0.55 in 2000 to 0.77 fish per hour in 2001. Numbers of fish 18 inches caught by anglers decreased from 0.41 in 2000 to 0.19 in 2001.

Moser, David C.

2003-03-01T23:59:59.000Z

244

Liquefied Petroleum Gas (LPG) storage facility study Fort Gordon, Georgia. Final report  

SciTech Connect

Fort Gordon currently purchases natural gas from Atlanta Gas Light Company under a rate schedule for Large Commercial Interruptible Service. This offers a very favorable rate for `interruptible` gas service, however, Fort Gordon must maintain a base level of `firm gas`, purchased at a significantly higher cost, to assure adequate natural gas supplies during periods of curtailment to support family housing requirements and other single fuel users. It is desirable to provide a standby fuel source to meet the needs of family housing and other single fuel users and eliminate the extra costs for the firm gas commitment to Atlanta Gas Light Company. Therefore, a propane-air standby fuel system is proposed to be installed at Fort Gordon.

NONE

1992-09-01T23:59:59.000Z

245

City of Fort Collins Utilities Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Collins Utilities Smart Grid Project Collins Utilities Smart Grid Project Jump to: navigation, search Project Lead City of Fort Collins Utilities Country United States Headquarters Location Fort Collins, Colorado Recovery Act Funding $18,101,263.00 Total Project Value $36,202,527.00 Coverage Area Coverage Map: City of Fort Collins Utilities Smart Grid Project Coordinates 40.5852602°, -105.084423° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

246

Core Holes At Fort Bliss Area (Combs, Et Al., 1999) | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Core Holes At Fort Bliss Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Holes At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Core Holes Activity Date Usefulness not indicated DOE-funding Unknown Notes Drilling for the four holes followed the same general pattern: 1) set a conductor casing to a depth of 30-50', 2) drill - 6" hole through mostly sand/clay sedentary formations to 500-600', 3) set 4-1/2" surface casing at that depth 4) core HQ (3.89" dia.) mostly through limestone/dolornite or

247

Resistivity Log At Fort Bliss Area (Combs, Et Al., 1999) | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Resistivity Log At Fort Bliss Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Single-Well and Cross-Well Resistivity At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Single-Well and Cross-Well Resistivity Activity Date Usefulness not indicated DOE-funding Unknown Notes Three principal types of data were obtained from this drilling project: core samples of the lithology penetrated by the holes, records of drilling behavior (such as water level in the hole, changes in rate of penetration

248

Thermal Gradient Holes At Cove Fort Area - Vapor (Warpinski, Et Al., 2002)  

Open Energy Info (EERE)

2) 2) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Thermal Gradient Holes Activity Date Usefulness not indicated DOE-funding Unknown Notes The project at Cove Fort/Sulphurdale in Utah, T26S R6/7W, is concerned with locating and drilling a 900-meter well to explore the western extension of the Cove Fort-Sulphurdale geothermal area. The geophysical exploration consisted of resistivity, ground magnetic, and microgravity surveys that were made to site the well in an optimum location. Drilling of the test well was completed in the fall of 2001 and results are currently being evaluated. The total depth of the well is 598 m with a non-equilibrated maximum temperature probably in the range of 157degrees C and a very complicated geologic structure.

249

Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al.,  

Open Energy Info (EERE)

(Warpinski, Et Al., (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity Survey At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects Retrieved from "http://en.openei.org/w/index.php?title=Direct-Current_Resistivity_Survey_At_Cove_Fort_Area_(Warpinski,_Et_Al.,_2004)&oldid=598126" Categories: Exploration Activities DOE Funded Activities What links here

250

Reflection Survey At Cove Fort Area - Liquid (Toksoz, Et Al, 2010) | Open  

Open Energy Info (EERE)

(Toksoz, Et Al, 2010) (Toksoz, Et Al, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Reflection Survey At Cove Fort Area (Toksoz, Et Al, 2010) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Reflection Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes We have collected various geophysical data around the geothermal field, including heat flow, gravity, MT, seismic surface wave phase and group velocity maps, seismic body wave travel time data and full seismic waveforms. All of these geophysical data sets have different strengths on characterizing subsurface structures and properties. Combining these data through a coordinated analysis and, when possible, by joint inversion provides a detailed model of the Cove Fort geothermal region.

251

Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2004) |  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current Resistivity At Cove Fort Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Cove Fort Geothermal Area Exploration Technique Direct-Current Resistivity Survey Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects

252

Property:Incentive/AddlPlaceCounty | Open Energy Information  

Open Energy Info (EERE)

AddlPlaceCounty AddlPlaceCounty Jump to: navigation, search Property Name Incentive/AddlPlaceCounty Property Type Page Pages using the property "Incentive/AddlPlaceCounty" Showing 25 pages using this property. (previous 25) (next 25) A Allegany County Wind Ordinance (Maryland) + Allegany County, Maryland + Anne Arundel County - Solar and Geothermal Equipment Property Tax Credit (Maryland) + Anne Arundel County, Maryland + Anne Arundel County - Wind Ordinance (Maryland) + Anne Arundel County, Maryland + B Baltimore County - Solar and Geothermal Equipment Property Tax Credit (Maryland) + Baltimore County, Maryland + Baltimore County - Wind Ordinance (Maryland) + Baltimore County, Maryland + Brownfield Development Tax Abatements (Alabama) + Alabama + C Calvert County - Wind Ordinance (Maryland) + Calvert County, Maryland +

253

Wind resource assessment and wind energy system cost analysis: Fort Huachuca, Arizona  

DOE Green Energy (OSTI)

The objective of this joint DOE and National Renewable Energy Laboratory (NREL) Strategic Environmental Research and Development Program (SERDP) project is to determine whether wind turbines can reduce costs by providing power to US military facilities in high wind areas. In support of this objective, one year of data on the wind resources at several Fort Huachuca sites was collected. The wind resource data were analyzed and used as input to an economic study for a wind energy installation at Fort Huachuca. The results of this wind energy feasibility study are presented in the report.

Olsen, T.L. [Tim Olsen Consulting, Denver, CO (United States); McKenna, E. [National Renewable Energy Lab., Golden, CO (United States)

1997-12-01T23:59:59.000Z

254

Queen Anne's County- Solar Zoning  

Energy.gov (U.S. Department of Energy (DOE))

Queen Anne's County zoning code allows for ground mounted solar arrays in areas zoned as "open space," "agricultural," and "countryside" districts.

255

Mono County geothermal activity  

SciTech Connect

Three geothermal projects have been proposed or are underway in Mono County, California. The Mammoth/Chance geothermal development project plans to construct a 10-MW geothermal binary power plant which will include 8 production and 3 injection wells. Pacific Lighting Energy Systems is also planning a 10-MW binary power plant consisting of 5 geothermal wells and up to 4 injection wells. A geothermal research project near Mammoth Lakes has spudded a well to provide a way to periodically measure temperature gradient, pressure, and chemistry of the thermal waters and to investigate the space-heating potential of the area in the vicinity of Mammoth Lakes. All three projects are briefly described.

Lyster, D.L.

1986-01-01T23:59:59.000Z

256

DOE/EIS-0265-SA-170: Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project (8/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2004 1, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-170) Jonathan McCloud Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Tapteal Bend Riparian Corridor Restoration Project Project No: 2002-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.9 Structural Bank Protection Using Bioengineering Methods, 2.1 Maintain Healthy Riparian Plant Communities Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) and the Tapteal Bend Greenway Association Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

257

Stafford County The Kansas County Profile Report is published annually by the Institute for Policy & Social  

E-Print Network (OSTI)

Stafford County #12;Foreword The Kansas County Profile Report is published annually to http://www.census.gov. Kansas County Profile Stafford County, Kansas Page 1 of 58 Population DECENNIAL on these classification systems, please refer to http://www.census.gov. Kansas County Profile Stafford County, Kansas Page

Peterson, Blake R.

258

Big Bend Preventorium Greenhouse Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Preventorium Greenhouse Low Temperature Geothermal Facility Preventorium Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Big Bend Preventorium Greenhouse Low Temperature Geothermal Facility Facility Big Bend Preventorium Sector Geothermal energy Type Greenhouse Location Big Bend, California Coordinates 39.6982182°, -121.4608015° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

259

MHK Projects/Vicksburg Bend | Open Energy Information  

Open Energy Info (EERE)

Vicksburg Bend Vicksburg Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

260

Insulation of Pipe Bends Improves Efficiency of Hot Oil Furnaces  

E-Print Network (OSTI)

Thermodynamic analyses of processes indicated low furnace efficiencies on certain hot oil furnaces. Further investigation, which included Infrared (IR) thermography testing of several furnaces, identified extremely hot surfaces on the outside of the convective sections. Consultation with the furnace manufacturer then revealed that furnaces made in the 1960's tended to not insulate the pipe bends in the convective section. When insulation was added within the covers of the pipe bends on one furnace, the energy efficiency improved by approximately 11%. The total savings are approximately 14,000 Million Btu/yr on one furnace. Insulation will be applied to several other furnaces at the site.

Haseltine, D. M.; Laffitte, R. D.

1999-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Canasawacta Creek Project: Chenango County, New York  

E-Print Network (OSTI)

County Soil and Water Conservation District, the U.S. ArmyCounty Soil and Water Conservation District (SWCD) ArmyCounty (NY) soil and Water Conservation District, and as an

OReilly, Mary; MacEwan, David; Greco, Brandon; Nelson, Debra; Long, George; Rowen, John

2007-01-01T23:59:59.000Z

262

FORT UNION COAL IN THE GREATER GREEN RIVER BASIN, EAST FLANK OF THE ROCK SPRINGS UPLIFT,  

E-Print Network (OSTI)

Chapter GS FORT UNION COAL IN THE GREATER GREEN RIVER BASIN, EAST FLANK OF THE ROCK SPRINGS UPLIFT 1999 Resource assessment of selected Tertiary coal beds and zones in the Northern Rocky in the toolbar to return. 1999 Resource assessment of selected Tertiary coal beds and zones in the Northern Rocky

263

FORT UNION COAL IN THE POWDER RIVER BASIN, WYOMING AND MONTANA: A SYNTHESIS  

E-Print Network (OSTI)

Chapter PS FORT UNION COAL IN THE POWDER RIVER BASIN, WYOMING AND MONTANA: A SYNTHESIS By R of selected Tertiary coal beds and zones in the Northern RockyMountains and Great Plains region, U Resource assessment of selected Tertiary coal beds and zones in the Northern Rocky Mountains and Great

264

Fort Collins, Colorado 80523-1586 Phone (970) 491-6612  

E-Print Network (OSTI)

practitioners who excel in their professional lives. Students frequently come to the classroom with work Springs, Fort Collins or on-line, the School of Social Work welcomes you to our learning community. ALL College of Health and Human Sciences School of Social Work http://www.ssw.chhs.colostate.edu Master

Stephens, Graeme L.

265

Fort Collins, Colorado 80523-1586 Phone (970) 491-6612  

E-Print Network (OSTI)

environment and graduating social work practitioners who excel in their professional lives. Students-time; or taking your courses in Thornton, Colorado Springs, Fort Collins or on-line, the School of Social Work College of Health and Human Sciences School of Social Work http://www.ssw.chhs.colostate.edu Master

Stephens, Graeme L.

266

Energy study of Laundry Facilities, Fort Knox, Kentucky: Executive summary (revised). Executive summary  

SciTech Connect

This document is the Executive Summary of the Energy Survey of Laundry Facilities at Fort Knox, Kentucky. The purpose of this document is to briefly outline the existing and historical energy situation, summarize the methodology and results of the Energy Study, and present the specific energy conservation projects developed through the Energy Study.

1986-12-01T23:59:59.000Z

267

Conceptual design report for the mechanical disassembly of Fort St. Vrain fuel elements  

Science Conference Proceedings (OSTI)

A conceptual design study was prepared that: (1) reviewed the operations necessary to perform the mechanical disassembly of Fort St. Vrain fuel elements; (2) contained a description and survey of equipment capable of performing the necessary functions; and (3) performed a tradeoff study for determining the preferred concepts and equipment specifications. A preferred system was recommended and engineering specifications for this system were developed.

Lord, D.L. [Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States); Wadsworth, D.C.; Sekot, J.P.; Skinner, K.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1993-04-01T23:59:59.000Z

268

FORT UNION COAL IN THE WILLISTON BASIN, NORTH DAKOTA: A SYNTHESIS  

E-Print Network (OSTI)

Chapter WS FORT UNION COAL IN THE WILLISTON BASIN, NORTH DAKOTA: A SYNTHESIS By R.M. Flores and C coal beds and zones in the Northern RockyMountains and Great Plains region, U.S. Geological Survey of selected Tertiary coal beds and zones in the Northern Rocky Mountains and Great Plains region, U

269

Two Floods in Fort Collins, Colorado: Learning from a Natural Disaster  

Science Conference Proceedings (OSTI)

A flash flood in Fort Collins, Colorado, on 28 July 1997 resulted in 5 deaths, 62 injuries, and more than $250 million in property damage. Following the 1997 flood, a great many changes were made in the city's preparedness infrastructure. On 30 ...

John F. Weaver; Eve Gruntfest; Glenn M. Levy

2000-10-01T23:59:59.000Z

270

Fort Hood Solar Total Energy Project. Volume III. Engineering drawings. Final report  

DOE Green Energy (OSTI)

Engineering drawings are presented for the Solar Total Energy System at Fort Hood, Texas. Drawings are given for the solar collector subsystem, power conversion subsystem, instrumentation and control subsystem, thermal storage subsystem, site preparation, thermal storage area piping and equipment layout, heating/cooling and domestic hot water subsystem, STES building and facility, and electrical distribution. (WHK)

None,

1979-01-01T23:59:59.000Z

271

Fission product behavior in the Peach Bottom and Fort St. Vrain HTGRs  

SciTech Connect

Actual operating data from Peach Bottom and Fort St. Vrain were compared with code predictions to assess the validity of the methods used to predict the behavior of fission products in the primary coolant circuit. For both reactors the measured circuit activities were significantly below design values, and the observations generally verify the codes used for large HTGR design.

Hanson, D.L.; Baldwin, N.L.; Strong, D.E.

1980-11-01T23:59:59.000Z

272

Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment  

SciTech Connect

The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort`s electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils {number_sign}2 and {number_sign}6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort.

Brodrick, J.R. [USDOE, Washington, DC (United States); Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A. [Pacific Northwest Lab., Richland, WA (United States)

1993-02-01T23:59:59.000Z

273

Better Buildings Neighborhood Program: Santa Barbara County,...  

NLE Websites -- All DOE Office Websites (Extended Search)

Santa Barbara County, California to someone by E-mail Share Better Buildings Neighborhood Program: Santa Barbara County, California on Facebook Tweet about Better Buildings...

274

Solar Maid Ventura County | Open Energy Information  

Open Energy Info (EERE)

search Logo: Solar Maid Ventura County Name Solar Maid Ventura County Place Lancaster, California Sector Solar Product Solar Operations and Maintenance Year founded 2012 Number...

275

Broome County Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Sign Up Search Page Edit with form History Facebook icon Twitter icon Broome County Biomass Facility Jump to: navigation, search Name Broome County Biomass Facility Facility...

276

Craven County Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Sign Up Search Page Edit with form History Facebook icon Twitter icon Craven County Biomass Facility Jump to: navigation, search Name Craven County Biomass Facility Facility...

277

Davis County Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Sign Up Search Page Edit with form History Facebook icon Twitter icon Davis County Biomass Facility Jump to: navigation, search Name Davis County Biomass Facility Facility...

278

Placer County Water Agency | Open Energy Information  

Open Energy Info (EERE)

Placer County Water Agency Jump to: navigation, search Name Placer County Water Agency Place California Utility Id 15127 Utility Location Yes Ownership P NERC Location WECC NERC...

279

Flexpad: highly flexible bending interactions for projected handheld displays  

Science Conference Proceedings (OSTI)

Flexpad is an interactive system that combines a depth camera and a projector to transform sheets of plain paper or foam into flexible, highly deformable, and spatially aware handheld displays. We present a novel approach for tracking deformed surfaces ... Keywords: bending, deformation, depth camera, flexible display, handheld display, projection, tracking, volumetric data

Jrgen Steimle; Andreas Jordt; Pattie Maes

2013-04-01T23:59:59.000Z

280

County\PAAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 1998 9, 1998 U.S. Department of Energy Office of General Counsel, GC-52 1000 Independence Avenue, S.W. Washington, D.C. 20585 COMMENTS TO THE PRICE-ANDERSON ACT NOTICE OF INQUIRY To whom it may concern: The attached comments by the Clark County, Nevada Department of Comprehensive Planning, Nuclear Waste Division, are in reference to a Notice of Inquiry (NOI) released by the Department of Energy (DOE) pursuant to Section 170p of the Atomic Energy Act. From the perspective of local government and the public, we support continuing the comprehensive provisions of the Price-Anderson Act. The need to have available sufficient financial resources to ameliorate impacts from nuclear incidents will be increasingly important in the future. The potential for accidents, for example, will be

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

350 City County Building  

Office of Legacy Management (LM)

(. (. - ,- Department of Eilqgy Washington, DC20585 ,. i x \ .The Honorable Wellington E. Webb .' '. ' 350 City County Building / Denver, Colorado 80202 ., ; Dear Mayor Webb: ., ~, Secretary of Energy' Hazel O'Leary has announced's new approach to openness in the Department of Energy,(OOE) and its communications with the public. In support of this initiative, we,are pleased to forward the'enclosed'information related to the former Uhiversity of Denver Research Institute site in your, jurisdiction that performed work for DOE's predecessor,agencies. This' i~nformation'is provided for your.informatibn, use,,and retention.. ; DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP) is responsible for identification of sitesused by DOE's predecessor agencies, determining

282

RECIPIENT:Monroe County  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

p,, '~~' p,, '~~' RECIPIENT:Monroe County u.s. DEP . .\RTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERJl.1INATION PROJECT TITLE: Landfill Gas Utilization Plant Page 1 01'3 STATE: NY Funding Opportunity Announcement Number Pro<:urement Instrument Number NEPA Control Number elD Number CDP DE-EEOO3123 GFO-O003123-001 EE3123 Based on my review of the infonnation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.IA), I have made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: 85.21 Methane The installation, modification, operation, and removal of commercially available methane gas recovery and gas recovery utilization systems installed within a previously disturbed or developed area on or contiguous to an existlng

283

Could Gila Bend, Arizona, Become the Solar Capital of the World? |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Could Gila Bend, Arizona, Become the Solar Capital of the World? Could Gila Bend, Arizona, Become the Solar Capital of the World? Could Gila Bend, Arizona, Become the Solar Capital of the World? November 15, 2011 - 9:57am Addthis Serving approximately 9,000 homes with clean renewable energy, the Paloma and Cotton Center solar plants highlight the rapidly rising solar corridor in Gila Bend, Arizona. | Photo courtesy of the town of Gila Bend, Arizona. Serving approximately 9,000 homes with clean renewable energy, the Paloma and Cotton Center solar plants highlight the rapidly rising solar corridor in Gila Bend, Arizona. | Photo courtesy of the town of Gila Bend, Arizona. Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs "Gila Bend had essentially been economically stagnant for the last two

284

The influence of return bends on the downstream pressure drop and condensation heat transfer in tubes  

E-Print Network (OSTI)

The influence of return bends on the downstream pressure drop and heat transfer coefficient of condensing refrigerant R-12 was studied experimentally. Flow patterns in glass return bends of 1/2 to 1 in. radius and 0.315 ...

Traviss, Donald P.

1971-01-01T23:59:59.000Z

285

Better Buildings Neighborhood Program: Fayette County, Pennsylvania  

NLE Websites -- All DOE Office Websites (Extended Search)

Fayette Fayette County, Pennsylvania to someone by E-mail Share Better Buildings Neighborhood Program: Fayette County, Pennsylvania on Facebook Tweet about Better Buildings Neighborhood Program: Fayette County, Pennsylvania on Twitter Bookmark Better Buildings Neighborhood Program: Fayette County, Pennsylvania on Google Bookmark Better Buildings Neighborhood Program: Fayette County, Pennsylvania on Delicious Rank Better Buildings Neighborhood Program: Fayette County, Pennsylvania on Digg Find More places to share Better Buildings Neighborhood Program: Fayette County, Pennsylvania on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA ME | MD | MA | MI | MO

286

Where the Sky Is the Right Color: Scale and Air Pollution in the Big Bend Region  

E-Print Network (OSTI)

sources implicated in Big Bend haze, namely coal-fired power plants; eliminating those plants or powering them through alternate

Donez, Francisco Juan

2010-01-01T23:59:59.000Z

287

Gratiot County | Open Energy Information  

Open Energy Info (EERE)

Gratiot County Gratiot County Jump to: navigation, search Name Gratiot County Facility Gratiot County Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Ivenergy Developer Ivenergy Energy Purchaser Detroit Edison Location Breckenridge MI Coordinates 43.38009947°, -84.4896698° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.38009947,"lon":-84.4896698,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

288

Power County | Open Energy Information  

Open Energy Info (EERE)

County County Jump to: navigation, search Name Power County Facility Power County Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner CG Power Solutions Developer CG Power Solutions Energy Purchaser PacifiCorp Location American Falls ID Coordinates 42.66135774°, -112.9727554° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.66135774,"lon":-112.9727554,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

289

Geothermal development plan: Yuma county  

DOE Green Energy (OSTI)

One hot spring and 33 wells drilled in the county discharge water at temperatures sufficient for direct-use geothermal applications such as process heat and space heating and cooling. Currently, one industry within the county has been identified which may be able to use geothermal energy for its process heat requirements. Also, a computer simulation model was used to predict geothermal energy on line as a function of time under both private and city-owned utility development of the resource.

White, D.H.

1981-01-01T23:59:59.000Z

290

Geothermal Development Plan: Pima County  

DOE Green Energy (OSTI)

Pima County is located entirely within the Basin and Range physiographic province in which geothermal resources are known to occur. Continued growth as indicated by such factors as population growth, employment and income will require large amounts of energy. It is believed that geothermal energy could provide some of the energy that will be needed. Potential users of geothermal energy within the county are identified.

White, D.H.

1981-01-01T23:59:59.000Z

291

Lincoln-Fort Rice, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Lincoln-Fort Rice, North Dakota: Energy Resources Lincoln-Fort Rice, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.7374001°, -100.7514845° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.7374001,"lon":-100.7514845,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

292

Neutron Log At Fort Bliss Area (Combs, Et Al., 1999) | Open Energy  

Open Energy Info (EERE)

Area (Combs, Et Al., 1999) Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Neutron Log At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Neutron Log Activity Date Usefulness not indicated DOE-funding Unknown Notes Three principal types of data were obtained from this drilling project: core samples of the lithology penetrated by the holes, records of drilling behavior (such as water level in the hole, changes in rate of penetration etc.), and multiple temperature logs (both during and after drilling) in each well. A suite of geophysical logs (gamma ray, neutron, sonic, and resistivity) was also run after completion of drilling. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr.,

293

them. A French military officer noted in 1750 that Indians living near Fort Figu  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

them. A French military officer noted in 1750 that Indians living near Fort Figure 11. Petroleum Production and Consumption them. A French military officer noted in 1750 that Indians living near Fort Figure 11. Petroleum Production and Consumption Duquesne (now the site of Pittsburgh) set fire to an oil-slicked creek as part of a religious ceremony. As settlement by Europeans proceeded, oil' was discovered in many places in northwestern Pennsylvania and western New York-to tile frequent dismay of the well-owners, who were drilling for salt brine./ >' Cons umption/ In the mid-1800s expanding uses for oil extracted from coal and shale began to hint at the value of rock oil and encouraged the search for readily accessible A Production supplies. This impetus launched the modem petroleum age, which began on a t 10 - Sunday afternoon in August 1859 at Oil Creek, near Titusville in northwestern-\

294

Core Analysis At Fort Bliss Area (Combs, Et Al., 1999) | Open Energy  

Open Energy Info (EERE)

9) 9) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Core Analysis At Fort Bliss Area (Combs, Et Al., 1999) Exploration Activity Details Location Fort Bliss Area Exploration Technique Core Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Three principal types of data were obtained from this drilling project: core samples of the lithology penetrated by the holes, records of drilling behavior (such as water level in the hole, changes in rate of penetration etc.), and multiple temperature logs (both during and after drilling) in each well. A suite of geophysical logs (gamma ray, neutron, sonic, and resistivity) was also run tier completion of drilling. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr.,

295

Thermal Gradient Holes At Fort Bidwell Area (Lafleur, Et Al., 2010) | Open  

Open Energy Info (EERE)

Bidwell Area (Lafleur, Et Al., 2010) Bidwell Area (Lafleur, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Fort Bidwell Area (Lafleur, Et Al., 2010) Exploration Activity Details Location Fort Bidwell Area Exploration Technique Thermal Gradient Holes Activity Date Usefulness useful DOE-funding Unknown Notes "Four wells have been successfully drilled into this resource since the early 1980s using a combination of funds provided by the California Energy Commission (CEC) and the United State Department of Energy (USDOE). The first three wells, FB-1, -2 and -3 have been discussed in a previous paper (Barker et al., 2005). The current status of the FBIC project to evaluate the potential geothermal resource under the reservation is that a deep

296

Reinhabiting the Fort Point Channel : a proposal for transforming and extending the warehouse district in South Boston  

E-Print Network (OSTI)

The focus of this design investigation is the warehouse fabric of the Fort Point Channel and its potentials as a model for further development This extensive configuration of warehouses and access roads is the product of ...

Dale, John Randall

1986-01-01T23:59:59.000Z

297

Energy efficiency campaign for residential housing at the Fort Lewis army installation  

SciTech Connect

In FY1999, Pacific Northwest National Laboratory conducted an energy efficiency campaign for residential housing at the Fort Lewis Army Installation near Tacoma, Washington. Preliminary weather-corrected calculations show energy savings of 10{percent} from FY98 for energy use in family housing. This exceeded the project's goal of 3{percent}. The work was funded by the U.S. DOEs Federal Energy Management Program (FEMP), Office of Energy Efficiency and Renewable Energy. The project adapted FEMP's national ``You Have the Power Campaign'' at the local level, tailoring it to the military culture. The applied research project was designed to demonstrate the feasibility of tailored, research-based strategies to promote energy conservation in military family housing. In contrast to many energy efficiency efforts, the campaign focused entirely on actions residents could take in their own homes, as opposed to technology or housing upgrades. Behavioral change was targeted because residents do not pay their own utility bills; thus other motivations must drive personal energy conservation. This campaign augments ongoing energy savings from housing upgrades carried out by Fort Lewis. The campaign ran from September 1998 through August 1999. The campaign strategy was developed based on findings from previous research and on input from residents and officials at Fort Lewis. Energy use, corrected to account for weather differences, was compared with the previous year's use. Survey responses from 377 of Fort Lewis residents of occupied housing showed that the campaign was moderately effective in promoting behavior change. Of those who were aware of the campaign, almost all said they were now doing one or more energy-efficient things that they had not done before. Most people were motivated by the desire to do the right thing and to set a good example for their children. They were less motivated by other factors.

AH McMakin; RE Lundgren; EL Malone

2000-02-23T23:59:59.000Z

298

Methodology for the evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana  

Science Conference Proceedings (OSTI)

The US Army and a private energy service company are developing a comprehensive energy efficiency project to upgrade the family housing at Fort Polk, Louisiana. The project includes converting the space conditioning systems of more than 4,000 housing units to geothermal (or ground-source) heat pumps (GHPs). This interim report describes the methodology of the evaluation associated with this project, including the field monitoring that has been conducted at the base.

Hughes, P.J.; Shonder, J.A.; White, D.L.; Huang, H.L.

1998-03-01T23:59:59.000Z

299

Population size and contaminant exposure of bats using caves on Fort Hood Military Base  

E-Print Network (OSTI)

Seasonal cave usage patterns were determined in an effort to understand the ecology of a bat colony at Shell Mountain Bat Cave in Fort Hood, Texas. Exit counts were conducted one night each month for 13 consecutive months to estimate the population and determine seasonal patterns. This cave was used as a maternity roost by a colony of cave myotis (myotis velifer) from March through October. Total colony size varies from month to month, becoming zero when bats leave during the winter. Old guano from two abandoned caves, Egypt and Tippet, on Fort Hood, and new guano from Shell Mountain was analyzed. Organochlorine residues showed higher levels of total chlordanes, endrin, dieldrin, mirex, p,p'-DDE, and o,p'-DDT in Egypt and Tippet caves; organophosphates showed higher amounts in the Shell Mountain guano. Organophosphates have never before been found in bat guano, and so what effects, if any, these amounts may indicate on the health of the colony are unknown. Some metals were also found in higher amounts in guano from Egypt and Tippet caves. Residue concentrations of organochlorines and metals in guano and carcasses collected from the three caves are low and probably of no concern. Comparisons among spring and fall guano smaples from Shell Mountain suggest that HCB, total chlordanes, dieldrin, endrin, endosulfan II, p,p'-DDE, and o,p'-DDT are accumulated while the bats are at Fort Hood. Lindane appears to be the only chemical that increases while the bats are at Fort Hood. Organochlorines found in carcasses tended to show smallest amounts in a lactating female and largest amounts in nursing juveniles.

Land, Tarisha Ann

2001-01-01T23:59:59.000Z

300

Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment  

SciTech Connect

The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort's electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils [number sign]2 and [number sign]6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort.

Brodrick, J.R. (USDOE, Washington, DC (United States)); Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A. (Pacific Northwest Lab., Richland, WA (United States))

1993-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Klamath County geo-heating district feasibility study  

DOE Green Energy (OSTI)

The results are presented of an agreement between the Klamath County Commissioners and Oregon Institute of Technology Geo-Heat Utilization Center for the conceptual design, cost analysis and plan for space heating a number of public buildings in Klamath Falls, Oregon with geothermal hot water. This project was principally aimed at supplying geothermal heat to ten city and county buildings by hot water extracted from the existing museum well. The supply system is also designed to include the post office and a new building to be built in the vicinity of the courthouse. The fluid would be piped from the museum well to three liquid-to-liquid heat exchangers and returned to the area of the producing well for reinjection into the same aquifer. The study also considered space heating of 98 additional buildings in the downtown business district equivalent to the ten public buildings and incorporating a snow removal grid on Main Street between Eleventh and Fourth Streets. The geothermal fluid would be supplied from wells in the vicinity of Old Fort Road (city police pistol range) and returned for reinjection. Based on the study, the Center has concluded that no major resource or engineering difficulties exist that would prevent the ten-building project from being completed successfully with a significant long-term savings in both scarce fossil fuels and total heating costs. A direct environmental benefit of the large-scale plan would be a significant reduction in air pollutants (16 tons per year) from the burning of natural gas. For a capital investment of approximately $548,900 the delivery system, conversion of building heating systems and waste disposal could be accomplished for the ten buildings with potential expansion to twelve.

Lienau, P.J.; Lund, J.W.; Culver, G.G.

1977-01-01T23:59:59.000Z

302

MHK Projects/Bar Field Bend | Open Energy Information  

Open Energy Info (EERE)

Bar Field Bend Bar Field Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.8967,"lon":-89.6897,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

303

MHK Projects/Avondale Bend Project | Open Energy Information  

Open Energy Info (EERE)

Avondale Bend Project Avondale Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9301,"lon":-90.2215,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

304

MHK Projects/New Madrid Bend Project | Open Energy Information  

Open Energy Info (EERE)

Madrid Bend Project Madrid Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.5515,"lon":-89.4613,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

305

MHK Projects/Kempe Bend Project | Open Energy Information  

Open Energy Info (EERE)

Kempe Bend Project Kempe Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.8622,"lon":-91.3073,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

306

South Bend, Indiana: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bend, Indiana: Energy Resources Bend, Indiana: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.6833813°, -86.2500066° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6833813,"lon":-86.2500066,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

307

MHK Projects/Milliken Bend Project | Open Energy Information  

Open Energy Info (EERE)

Milliken Bend Project Milliken Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.5594,"lon":-91.1119,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

308

Big Bend, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bend, Wisconsin: Energy Resources Bend, Wisconsin: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.8814034°, -88.2067573° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8814034,"lon":-88.2067573,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

309

MHK Projects/Cow Island Bend | Open Energy Information  

Open Energy Info (EERE)

Island Bend Island Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.0269,"lon":-90.2792,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

310

MHK Projects/Greenville Bend Project | Open Energy Information  

Open Energy Info (EERE)

Greenville Bend Project Greenville Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9231,"lon":-90.1433,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

311

MHK Projects/Old Town Bend | Open Energy Information  

Open Energy Info (EERE)

Old Town Bend Old Town Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.3713,"lon":-90.7493,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

312

MHK Projects/Springfield Bend | Open Energy Information  

Open Energy Info (EERE)

Springfield Bend Springfield Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.5654,"lon":-91.2603,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

313

MHK Projects/Georgetown Bend | Open Energy Information  

Open Energy Info (EERE)

Georgetown Bend Georgetown Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.5735,"lon":-91.1986,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

314

MHK Projects/Davis Island Bend | Open Energy Information  

Open Energy Info (EERE)

Island Bend Island Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.1299,"lon":-91.0636,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

315

MHK Projects/Little Prairie Bend Project | Open Energy Information  

Open Energy Info (EERE)

Little Prairie Bend Project Little Prairie Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.2522,"lon":-89.657,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

316

MHK Projects/Matthews Bend | Open Energy Information  

Open Energy Info (EERE)

Matthews Bend Matthews Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.1201,"lon":-91.1208,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

317

City of West Bend, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Bend Bend Place Iowa Utility Id 20364 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Rates Commercial Commercial Electric Rates (3 Phase) Commercial Industrial Electric Rates Industrial Residential Electric Rates Residential Rural Electric Rates (3 Phase) Commercial Rural Electric Rates (Single Phase) Commercial Average Rates Residential: $0.0755/kWh Commercial: $0.0716/kWh Industrial: $0.0795/kWh References

318

Post Oak Bend City, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Oak Bend City, Texas: Energy Resources Oak Bend City, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 32.6320777°, -96.3135917° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.6320777,"lon":-96.3135917,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

319

MHK Projects/Carrolton Bend Project | Open Energy Information  

Open Energy Info (EERE)

Carrolton Bend Project Carrolton Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.95,"lon":-90.1551,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

320

MHK Projects/Gouldsboro Bend Project | Open Energy Information  

Open Energy Info (EERE)

Gouldsboro Bend Project Gouldsboro Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9177,"lon":-90.0673,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

MHK Projects/Scotlandville Bend Project | Open Energy Information  

Open Energy Info (EERE)

Scotlandville Bend Project Scotlandville Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.5166,"lon":-91.218,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

322

MHK Projects/Walker Bend Project | Open Energy Information  

Open Energy Info (EERE)

Walker Bend Project Walker Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.3678,"lon":-91.1315,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

323

MHK Projects/Hickman Bend Project | Open Energy Information  

Open Energy Info (EERE)

Hickman Bend Project Hickman Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.6007,"lon":-89.21,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

324

MHK Projects/Island 14 Bend | Open Energy Information  

Open Energy Info (EERE)

Island 14 Bend Island 14 Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.2837,"lon":-89.576,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

325

MHK Projects/Fitler Bend | Open Energy Information  

Open Energy Info (EERE)

Fitler Bend Fitler Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.8007,"lon":-91.1586,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

326

MHK Projects/Newton Bend Project | Open Energy Information  

Open Energy Info (EERE)

Newton Bend Project Newton Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.218,"lon":-90.9891,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

327

MHK Projects/Morgan Bend Crossing Project | Open Energy Information  

Open Energy Info (EERE)

Morgan Bend Crossing Project Morgan Bend Crossing Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.7879,"lon":-91.5469,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

328

MHK Projects/Sara Bend Project | Open Energy Information  

Open Energy Info (EERE)

Sara Bend Project Sara Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.751,"lon":-91.3999,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

329

MHK Projects/Kenner Bend Project | Open Energy Information  

Open Energy Info (EERE)

Kenner Bend Project Kenner Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9596,"lon":-90.2868,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

330

MHK Projects/Slough Bend | Open Energy Information  

Open Energy Info (EERE)

Slough Bend Slough Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.4778,"lon":-89.4436,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

331

MHK Projects/Island 35 Bend | Open Energy Information  

Open Energy Info (EERE)

MHK Projects/Island 35 Bend MHK Projects/Island 35 Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.5435,"lon":-89.9079,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

332

MHK Projects/St Rose Bend | Open Energy Information  

Open Energy Info (EERE)

Rose Bend Rose Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9309,"lon":-90.3433,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

333

MHK Projects/Miller Bend Project | Open Energy Information  

Open Energy Info (EERE)

Miller Bend Project Miller Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.4887,"lon":-91.1612,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

334

MHK Projects/Little Cypress Bend | Open Energy Information  

Open Energy Info (EERE)

Cypress Bend Cypress Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.3482,"lon":-89.5892,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

335

Gila Bend, Arizona: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bend, Arizona: Energy Resources Bend, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 32.9478236°, -112.7168305° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.9478236,"lon":-112.7168305,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

336

MHK Projects/Saint Catherine Bend | Open Energy Information  

Open Energy Info (EERE)

Saint Catherine Bend Saint Catherine Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.4111,"lon":-91.4953,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

337

MHK Projects/Remy Bend Project | Open Energy Information  

Open Energy Info (EERE)

Remy Bend Project Remy Bend Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0121,"lon":-90.754,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

338

Bessemer Bend, Wyoming: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bessemer Bend, Wyoming: Energy Resources Bessemer Bend, Wyoming: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.7580196°, -106.5203123° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.7580196,"lon":-106.5203123,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

339

MHK Projects/Linwood Bend | Open Energy Information  

Open Energy Info (EERE)

Linwood Bend Linwood Bend < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.1676,"lon":-89.6216,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

340

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: W.A. Parish Post-Combustion CO2 Capture and Sequestration 73: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

342

CX-002367: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

367: Categorical Exclusion Determination 367: Categorical Exclusion Determination CX-002367: Categorical Exclusion Determination Fort Bend County Energy Efficiency Conservation Block Grant CX(s) Applied: A9, A11, B5.1 Date: 05/07/2010 Location(s): Fort Bend County, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Fort Bend County, Texas would use Department of Energy funds for the following activities which are bounded by the signed Statement of Work and are therefore categorically excluded under National Environmental Policy Act: Activity 3: Energy Audits, Activity 4: Building Retrofits based on Energy Audit Findings The following activities have already been categorically excluded at the time of award or were associated with waste stream/historic clauses only and are not part of this action: Activity 1:

343

Fort Hood solar total energy project. Technical support and systems integration. First semiannual report, May 1-October 31, 1978  

DOE Green Energy (OSTI)

Progress on the design of a Solar Total Energy System which will supply a significant portion of the energy requirements of a troop housing complex at Fort Hood, Texas, is described. Selection and sizing of the distributed collector field are discussed, and parabolic trough collector technology is reviewed. Energy load measurements and insolation models for the Fort Hood site are described. Technical project support efforts are reviewed. (WHK)

None,

1978-01-01T23:59:59.000Z

344

Federal Energy Decision Screening (FEDS) process at Fort Drum, New York  

SciTech Connect

The federal energy manager has been directed by the Comprehensive Energy Policy Act of 1992 (EPAct) to reduce energy consumption by 20% from 1985 levels, by the year 2000. However, the tools and funding to capture this resource in a cost-effective manner have not been provided. In an effort to assist federal agencies in meeting EPAct requirements, the Pacific Northwest Laboratory (PNL) has been tasked by the US Army Forces Command (FORSCOM) to identify, evaluate, and acquire all cost-effective energy projects at selected federal facilities. PNL has developed and applied the Federal Energy Decision Screening (FEDS) methodology at the Fort Drum FORSCOM facility near Watertown, New York. The FEDS methodology is a systematic approach to evaluating energy opportunities that result in a roadmap to significantly reduce energy use in a planned, rational, cost justified fashion over a 5 to 10 year period. At Fort Drum, the net present value (NPV) of the installed cost of all cost-effective energy resource opportunities (EROS) is over $16 million (1992 $). The NPV of the savings associated with this investment is nearly $47 million (1992 $), for an overall NPV of approximately $31 million. By implementing all the cost-effective EROS, Fort Drum will reduce annual energy use by over 230,000 MBtu, or 15%. Annual energy expenditures will decrease by over $2.4 million, or a 20% reduction.

Dixon, D.R.; Daellenbach, K.K. [Pacific Northwest Lab., Richland, WA (United States); Rowley, S.E. [Directorate of Engineering & Housing, Ft. Drum, NY (United States); Gillespie, A.H. [Army Forces Command, Ft. McPherson, GA (United States)

1993-10-01T23:59:59.000Z

345

Energy saving potential of residential HVAC options at Fort Irwin, California  

Science Conference Proceedings (OSTI)

The Pacific Northwest Laboratory (PNL) evaluated heating and cooling system options for existing family housing at Fort Irwin, California. The purpose of this work was to quantify the energy conservation potential of alternative system types and to identify the most cost-effective technology available. The conventional residential heating/cooling systems at Fort Irwin are separate propane forced-air furnaces and central air conditioners. The options examined included air- and ground-source heat pumps, a natural gas furnace with central air conditioning, and a natural-gas-fired heat pump. The most cost-effective technology applicable to Fort Irwin was found to be the high-efficiency ground-source heat pumps. If all conventional units were replaced immediately, the net energy savings would be 76,660 MBtu (80.9 TJ) per year and a reduction in electrical demand of approximately 15,000 kW-month. The initial investment for implementing this technology would be approximately $7.1 million, with a savings-to-investment ratio of 1.74.

Hadley, D.L.; Stucky, D.J.

1995-03-01T23:59:59.000Z

346

Geothermal reservoir assessment: Cove Fort-Sulphurdale Unit. Final report, September 1977-July 1979  

DOE Green Energy (OSTI)

Three exploratory geothermal wells were drilled in the Cove Fort-Sulphurdale geothermal resource area in southwestern Utah to obtain new subsurface data for inclusion in the US DOE's geothermal reservoir assessment program. Existing data from prior investigations which included the drilling of an earlier exploratory well at the Cove Fort-Sulphurdale area was also provided. Two of the wells were abandoned before reaching target depth because of severe lost circulation and hole sloughing problems. The two completed holes reached depths of 5221 ft. and 7735 ft., respectively, and a maximum reservoir temperature of 353/sup 0/F at 7320 ft. was measured. The deepest well flow was tested at the rate of 47,000 lbs/h with a wellhead temperature of 200/sup 0/F and pressure of 3 psig. Based upon current economics, the Cove Fort-Sulphurdale geothermal resource is considered to be sub-commercial for the generation of electrical power. A synopsis is given of the exploratory drilling activities and results containing summary drilling, testing, geologic and geochemical information from four exploratory geothermal wells.

Ash, D.L.; Dondanville, R.F.; Gulati, M.S.

1979-12-01T23:59:59.000Z

347

Land Cover Differences in Soil Carbon and Nitrogen at Fort Benning, Georgia  

SciTech Connect

Land cover characterization might help land managers assess the impacts of management practices and land cover change on attributes linked to the maintenance and/or recovery of soil quality. However, connections between land cover and measures of soil quality are not well established. The objective of this limited investigation was to examine differences in soil carbon and nitrogen among various land cover types at Fort Benning, Georgia. Forty-one sampling sites were classified into five major land cover types: deciduous forest, mixed forest, evergreen forest or plantation, transitional herbaceous vegetation, and barren land. Key measures of soil quality (including mineral soil density, nitrogen availability, soil carbon and nitrogen stocks, as well as properties and chemistry of the O-horizon) were significantly different among the five land covers. In general, barren land had the poorest soil quality. Barren land, created through disturbance by tracked vehicles and/or erosion, had significantly greater soil density and a substantial loss of carbon and nitrogen relative to soils at less disturbed sites. We estimate that recovery of soil carbon under barren land at Fort Benning to current day levels under transitional vegetation or forests would require about 60 years following reestablishment of vegetation. Maps of soil carbon and nitrogen were produced for Fort Benning based on a 1999 land cover map and field measurements of soil carbon and nitrogen stocks under different land cover categories.

Garten Jr., C.T.

2004-02-09T23:59:59.000Z

348

Big Bend Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Big Bend Hot Springs Geothermal Area Big Bend Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Big Bend Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0217,"lon":-121.9183,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

349

Bending free toroidal shells for tokamak fusion reactors  

SciTech Connect

Several authors have suggested a novel shape for the toroidal field (TF) coils of a tokamak fusion reactor. Collectively, these magnet shapes have become referred to as the ''Princeton D-coil.'' This coil shape can be derived by assuming that for a thin conductor to be in a state of ''pure tension,'' its radius of curvature must be proportional to the toroidal radius. A principal disadvantage of this derivation is that out-of-plane support, a necessary feature in the design of a tokamak fusion reactor, is neglected. A derivation of a bending free toroidal shell for a tokamak fusion reactor is presented. The out-of-plane structure is considered to be an integral part of the fusion reactor and therefore its shape is optimized to produce a bending free stress distribution. This shape, which is nearly circular for aspect ratios greater than 2.5, is derived by solving the equilibrium, constitutive, and kinematic relationships for a uniform toroidal membrane. This membrane is subjected to a magnetic pressure which is inversely proportional to the square of the toroidal radius. A comparison between this bending free shape and the D-shape is presented.

Gray, W.H.; Stoddart, W.C.T.; Akin, J.E.

1977-01-01T23:59:59.000Z

350

Structural characterization of the Emperor and Halley fields, Winkler County, West Texas  

E-Print Network (OSTI)

The Halley and Emperor fields, Winkler County, West Texas, are located along the western margin of the Central Basin Platform (CBP), a late Paleozoic fault-bounded structural high in the Permian Basin. Well data, regional 2D seismic lines, and a 3D seismic data set were used to develop a detailed structural and stratigraphic interpretation for the area. Variance volume attributes were derived from the 3D seismic data, which improved imaging of subsurface features. The Halley and Emperor fields are situated over asymmetric anticlines with short steeper limbs that are faulted by steeply dipping reverse faults with a component of right-lateral strike-slip displacement. The orientation of the fold axes and faults is NNW-SSE, which is parallel to the overall trend of the CBP's western margin. Deformation occurred during late Mississippian to early Leonardian (Early Permian) time. The CBP can be subdivided into two major blocks or tectonic domains: the Andector Block to the north and the Fort Stockton Block to the south. These blocks were located between an inferred right-lateral mega-shear, which forced the Andector and Fort Stockton blocks to undergo clockwise rotation. A left-lateral shear zone must have existed along the E-W fault boundary between the Fort Stockton and Andector blocks, in order to accommodate clockwise rotation of the blocks. The Halley structure is situated at the southwestern corner of the Andector Block and shows evidence of younger middle Pennsylvanian to middle Leonardian left-lateral strike-slip deformation. In contrast, deformation along the Emperor structure to the north had ceased by late Pennsylvanian time, as indicated by the age of strata that onlap the structure and fault penetration patterns.

Leone, John Vincent

2001-01-01T23:59:59.000Z

351

Funding for state, city, and county governments in the state...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funding for state, city, and county governments in the state includes: Funding for state, city, and county governments in the state includes: Funding for state, city, and county...

352

Anderson County, South Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Anderson County, South Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Anderson County, South Carolina ASHRAE Standard ASHRAE 169-2006...

353

Androscoggin County, Maine ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Androscoggin County, Maine ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Androscoggin County, Maine ASHRAE Standard ASHRAE 169-2006 Climate...

354

Allegan County, Michigan ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Allegan County, Michigan ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Allegan County, Michigan ASHRAE Standard ASHRAE 169-2006 Climate Zone...

355

Becker County, Minnesota ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Becker County, Minnesota ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Becker County, Minnesota ASHRAE Standard ASHRAE 169-2006 Climate Zone...

356

Bennington County, Vermont ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Bennington County, Vermont ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Bennington County, Vermont ASHRAE Standard ASHRAE 169-2006 Climate...

357

Abbeville County, South Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Abbeville County, South Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Abbeville County, South Carolina ASHRAE Standard ASHRAE 169-2006...

358

Baltimore County, Maryland ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Baltimore County, Maryland ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Baltimore County, Maryland ASHRAE Standard ASHRAE 169-2006 Climate...

359

Barnwell County, South Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Barnwell County, South Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Barnwell County, South Carolina ASHRAE Standard ASHRAE 169-2006...

360

Berkshire County, Massachusetts ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Berkshire County, Massachusetts ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Berkshire County, Massachusetts ASHRAE Standard ASHRAE 169-2006...

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Arapahoe County, Colorado ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Arapahoe County, Colorado ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Arapahoe County, Colorado ASHRAE Standard ASHRAE 169-2006 Climate Zone...

362

Alexander County, North Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Alexander County, North Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Alexander County, North Carolina ASHRAE Standard ASHRAE 169-2006...

363

Albemarle County, Virginia ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Albemarle County, Virginia ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Albemarle County, Virginia ASHRAE Standard ASHRAE 169-2006 Climate...

364

Alfalfa County, Oklahoma ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Alfalfa County, Oklahoma ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Alfalfa County, Oklahoma ASHRAE Standard ASHRAE 169-2006 Climate Zone...

365

Berks County, Pennsylvania ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Berks County, Pennsylvania ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Berks County, Pennsylvania ASHRAE Standard ASHRAE 169-2006 Climate...

366

Bayfield County, Wisconsin ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Bayfield County, Wisconsin ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Bayfield County, Wisconsin ASHRAE Standard ASHRAE 169-2006 Climate...

367

Augusta County, Virginia ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Augusta County, Virginia ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Augusta County, Virginia ASHRAE Standard ASHRAE 169-2006 Climate Zone...

368

Alamance County, North Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Alamance County, North Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Alamance County, North Carolina ASHRAE Standard ASHRAE 169-2006...

369

Archuleta County, Colorado ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Archuleta County, Colorado ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Archuleta County, Colorado ASHRAE Standard ASHRAE 169-2006 Climate...

370

Allendale County, South Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Allendale County, South Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Allendale County, South Carolina ASHRAE Standard ASHRAE 169-2006...

371

Barron County, Wisconsin ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Barron County, Wisconsin ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Barron County, Wisconsin ASHRAE Standard ASHRAE 169-2006 Climate Zone...

372

Baltimore City County, Maryland ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Baltimore City County, Maryland ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Baltimore City County, Maryland ASHRAE Standard ASHRAE 169-2006...

373

Berkeley County, South Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Berkeley County, South Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Berkeley County, South Carolina ASHRAE Standard ASHRAE 169-2006...

374

Alameda County, California ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Edit History Facebook icon Twitter icon Alameda County, California ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Alameda County,...

375

Bedford County, Tennessee ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Bedford County, Tennessee ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Bedford County, Tennessee ASHRAE Standard ASHRAE 169-2006 Climate Zone...

376

Bedford City County, Virginia ASHRAE 169-2006 Climate Zone |...  

Open Energy Info (EERE)

Bedford City County, Virginia ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Bedford City County, Virginia ASHRAE Standard ASHRAE 169-2006...

377

Beaufort County, North Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

History Facebook icon Twitter icon Beaufort County, North Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Beaufort County, North...

378

Audrain County, Missouri ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Audrain County, Missouri ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Audrain County, Missouri ASHRAE Standard ASHRAE 169-2006 Climate Zone...

379

Anderson County, Kentucky ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Anderson County, Kentucky ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Anderson County, Kentucky ASHRAE Standard ASHRAE 169-2006 Climate Zone...

380

Ballard County, Kentucky ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Ballard County, Kentucky ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Ballard County, Kentucky ASHRAE Standard ASHRAE 169-2006 Climate Zone...

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Alleghany County, North Carolina ASHRAE 169-2006 Climate Zone...  

Open Energy Info (EERE)

Alleghany County, North Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Alleghany County, North Carolina ASHRAE Standard ASHRAE 169-2006...

382

Aitkin County, Minnesota ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Aitkin County, Minnesota ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Aitkin County, Minnesota...

383

Barbour County, West Virginia ASHRAE 169-2006 Climate Zone |...  

Open Energy Info (EERE)

Barbour County, West Virginia ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Barbour County, West Virginia ASHRAE Standard ASHRAE 169-2006...

384

Beltrami County, Minnesota ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Beltrami County, Minnesota ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Beltrami County, Minnesota ASHRAE Standard ASHRAE 169-2006 Climate...

385

Ashland County, Wisconsin ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Ashland County, Wisconsin ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Ashland County, Wisconsin ASHRAE Standard ASHRAE 169-2006 Climate Zone...

386

Belknap County, New Hampshire ASHRAE 169-2006 Climate Zone |...  

Open Energy Info (EERE)

Belknap County, New Hampshire ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Belknap County, New Hampshire ASHRAE Standard ASHRAE 169-2006...

387

Accomack County, Virginia ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Accomack County, Virginia ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Accomack County, Virginia ASHRAE Standard ASHRAE 169-2006 Climate Zone...

388

Bertie County, North Carolina ASHRAE 169-2006 Climate Zone |...  

Open Energy Info (EERE)

Bertie County, North Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Bertie County, North Carolina ASHRAE Standard ASHRAE 169-2006...

389

Arlington County, Virginia ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Arlington County, Virginia ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Arlington County, Virginia ASHRAE Standard ASHRAE 169-2006 Climate...

390

Asotin County, Washington ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Asotin County, Washington ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Asotin County, Washington ASHRAE Standard ASHRAE 169-2006 Climate Zone...

391

Bamberg County, South Carolina ASHRAE 169-2006 Climate Zone ...  

Open Energy Info (EERE)

Bamberg County, South Carolina ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Bamberg County, South Carolina ASHRAE Standard ASHRAE 169-2006...

392

Fairfax County - Green Power Purchase (Virginia) | Open Energy...  

Open Energy Info (EERE)

2010), wind power accounted for 10% of the general county's annual electricity consumption (and hence, the county met their stated goal of 10% by 2010). Fairfax County does...

393

111th Congressional Districts and Counties | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Districts and Counties Dataset Summary Description This dataset contains a nationwide inventory of all congressional districts and the counties or pieces of counties associated...

394

Winnebago County Landfill Gas Biomass Facility | Open Energy...  

Open Energy Info (EERE)

Winnebago County Landfill Gas Biomass Facility Jump to: navigation, search Name Winnebago County Landfill Gas Biomass Facility Facility Winnebago County Landfill Gas Sector Biomass...

395

PP-118 Hill County Electric Cooperative Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 Hill County Electric Cooperative Inc PP-118 Hill County Electric Cooperative Inc Presidential permit authorizing Hill County Electric Cooperative Inc to construct, operate, and...

396

Geothermal development plan: Yuma County  

DOE Green Energy (OSTI)

The Yuma County Area Development Plan evaluated the county-wide market potential for utilizing geothermal energy. The study identified four potential geothermal resource areas with temperatures less than 90/sup 0/C (194/sup 0/F), and in addition, two areas are inferred to contain geothermal resources with intermediate (90/sup 0/C to 150/sup 0/C, 194/sup 0/F to 300/sup 0/F) temperature potential. The resource areas are isolated, although one resource area is located near Yuma, Arizona. One resource site is inferred to contain a hot dry rock resource. Anticipated population growth in the county is expected to be 2 percent per year over the next 40 years. The primary employment sector is agriculture, though some light industry is located in the county. Water supplies are found to be adequate to support future growth without advese affect on agriculture. Six firms were found in Yuma County which may be able to utilize geothermal energy for process heat needs. In addition, several agricultural processors were found, concentrated in citrus processing and livestock raising. Geothermal energy utilization projections suggest that by the year 2000, geothermal energy may economically provide the energy equivalent of 53,000 barrels of oil per year to the industrial sector if developed privately. Geothermal utilization projections increase to 132,000 barrels of oil per year by 2000 if a municipal utility developed the resource.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

397

RECIPIENT:Lake County, FL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake County, FL Lake County, FL u.s. DEPARTIIIEN T OF ENERGY EERE PROJECT MANAGEMENT CEN T ER NEPA DETERlIJJNATION PROJECf TITLE: Lake County, FL EECBG SOW (S) Page lof2 STATE: FL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Numbcr CID Numbtr OE·FOA-OOOOO13 DE·EE00Q0786.001 0 Based on my review of the information concerning the proposed adion, as NEPA Compliance Officer (authorized undtr DOE Order 451.IA), I have made the following determination: ex. EA, EIS APPENDIX AND NUMBER: Description: 65.1 Actions to conserve energy, demonstrate potential energy conserva tion, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

398

Geothermal development plan: Maricopa county  

DOE Green Energy (OSTI)

Maricopa county is the area of Arizona receiving top priority since it contains over half of the state's population. The county is located entirely within the Basin and Range physiographic region in which geothermal resources are known to occur. Several approaches were taken to match potential users to geothermal resources. One approach involved matching some of the largest facilities in the county to nearby geothermal resources. Other approaches involved identifying industrial processes whose heat requirements are less than the average assessed geothermal reservoir temperature of 110/sup 0/C (230/sup 0/F). Since many of the industries are located on or near geothermal resources, geothermal energy potentially could be adapted to many industrial processes.

White, D.H.

1981-01-01T23:59:59.000Z

399

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

This EIS, prepared by the Bureau of Land Management with DOEs Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Westerns transmission lines.

400

Real-time resilient focusing through a bending multimode fiber  

E-Print Network (OSTI)

We introduce a system capable of focusing light through a multimode fiber in 37ms, one order of magnitude faster than demonstrated in previous reports. As a result, the focus spot can be maintained during significant bending of the fiber, opening numerous opportunities for endoscopic imaging and energy delivery applications. We measure the transmission matrix of the fiber by projecting binary-amplitude computer generated holograms using a digital micromirror device and a field programmable gate array controller. The system shows two orders of magnitude enhancements of the focus spot relative to the background.

Caravaca-Aguirre, Antonio M; Conkey, Donald B; Piestun, Rafael

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Montgomery County, Kentucky: Energy Resources | Open Energy Informatio...  

Open Energy Info (EERE)

County is a county in Kentucky. Its FIPS County Code is 173. It is classified as ASHRAE 169-2006 Climate Zone Number 4 Climate Zone Subtype A. Places in Montgomery County,...

402

Carroll County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

County is a county in Tennessee. Its FIPS County Code is 017. It is classified as ASHRAE 169-2006 Climate Zone Number 4 Climate Zone Subtype A. Places in Carroll County,...

403

Knox County, Kentucky: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Knox County is a county in Kentucky. Its FIPS County Code is 121. It is classified as ASHRAE 169-2006 Climate Zone Number 4 Climate Zone Subtype A. Places in Knox County, Kentucky...

404

Better Buildings Partners: Rutland County, Vermont  

NLE Websites -- All DOE Office Websites (Extended Search)

Rutland County, Vermont Rutland County, Vermont H.E.A.T. Squad Warms Homeowners up to Energy Efficiency Photo of an ornate historical building, with flowering trees beside it. A...

405

Ashe County- Wind Energy System Ordinance  

Energy.gov (U.S. Department of Energy (DOE))

In 2007 Ashe County adopted a wind ordinance to regulate the use of wind-energy systems in unincorporated areas of the county and to describe the conditions by which a permit for installing such a...

406

Miami Dade County Public School Financing Profile  

NLE Websites -- All DOE Office Websites (Extended Search)

Profile of Success Miami-Dade County Public Schools Miami-Dade County Public Schools-Stats at a Glance Finance Vehicle Tax-exempt lease purchase agreement (via master lease)...

407

California Energy Commission - Electricity Consumption by County  

Open Energy Info (EERE)

County (2006-2009) Electricity consumption data from the California Energy Commission sorted by County for Residential and Non-residential from 2006 to 2009.


...

408

Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort Fairfield LP & Boralex Ashland LP: Federal Register Notice Vol 74 No 151  

Energy.gov (U.S. Department of Energy (DOE))

Application from Boralex Fort Fairfield LP & Boralex Ashland LP to export electric energy to Canada. Federal Register Notice Vol 74 No 151

409

Geothermal heat pump energy savings performance contract at Fort Polk, LA: Lessons learned  

DOE Green Energy (OSTI)

At Fort Polk, LA the space conditioning systems of 4,003 military family housing units have been converted to geothermal heat pumps (GHP) under an energy savings performance contract (ESPC). At the same time, other efficiency measures, such as compact fluorescent lights (CFLs), low-flow shower heads, and attic insulation, were installed. An independent evaluation of the Fort Polk ESPC was carried out. Findings indicate that the project has resulted in a 25.6 million kWh savings in electrical energy use, or 32.4% of the pre-retrofit electrical consumption in family housing, for a typical meteorological year. Peak electrical demand has also been reduced by 6,541 kW, which is 39.6% of the pre-retrofit peak demand. Natural gas savings are about 260,000 therms per year. In addition, the ESPC has allowed the Army to effectively cap its future expenditures for family housing HVAC maintenance at about 77% of its previous costs. Given these successful results, the Fort Polk ESPC can provide a model for other ESPCs in both the public and the private sectors. The purpose of this paper is to outline the method by which the ESPC was engineered and implemented, both from the standpoint of the facility owner (the US Army) and the energy services company (ESCO) which is carrying out the contract. The lessons learned from this experience should be useful to other owners, ESCOs and investors in the implementation of future ESPCs. It should be noted that the energy savings presented in this document are the apparent energy savings observed in the monitored data, and are not to be confused with the contracted energy savings used as the basis for payments. To determine the contracted energy savings, the apparent energy savings may require adjustments for such things as changes in indoor temperature performance criteria, additions of ceiling fans, and other factors.

Shonder, J.A.; Hughes, P.J. [Oak Ridge National Lab., TN (United States); Gordon, R. [Applied Energy Management Techniques, Corvallis, OR (United States); Giffin, T. [SAIC/The Fleming Group, East Syracuse, NY (United States)

1997-08-01T23:59:59.000Z

410

ASSESSMENT OF HYDROCARBON SEEPAGE DETECTION METHODS ON THE FORT PECK RESERVATION, NORTHEAST MONTANA  

Science Conference Proceedings (OSTI)

Surface exploration techniques have been employed in separate study areas on the Fort Peck Reservation in northeastern Montana. Anomalies associated with hydrocarbon seepage are documented in all three areas and a variety of surface exploration techniques can be compared. In a small area with established production, Head Gas and Thermal Desorption methods best match production; other methods also map depletion. In a moderate-size area that has prospects defined by 3D seismic data, Head Gas along with Microbial, Iodine, and Eh soil anomalies are all associated with the best hydrocarbon prospect. In a large area that contains many curvilinear patterns observed on Landsat images, that could represent micro-seepage chimneys, results are inconclusive. Reconnaissance mapping using Magnetic Susceptibility has identified a potential prospect; subsequent Soil Gas and Head Gas surveys suggest hydrocarbon potential. In the final year of this project the principle contractor, the Fort Peck Tribes, completed a second survey in the Wicape 3D Seismic Prospect Area (also known as Area 6 in Phase I of the project) and sampled several Landsat image features contained in the Smoke Creek Aeromag Anomaly Area (also known as Area 1 in Phase II of the project). Methods determined to be most useful in Phases I and II, were employed in this final Phase III of the study. The Southwest Wicape seismic anomaly was only partially confirmed. The abundant curvilinears proposed to be possible hydrocarbon micro-seepage chimneys in the Smoke Creek Area were not conclusively verified as such. Insufficient sampling of background data precludes affirmative identification of these mostly topographic Landsat features as gas induced soil and vegetation anomalies. However relatively higher light gas concentrations were found associated with some of the curvilinears. Based on the findings of this work the Assiniboine & Sioux Tribes of the Fort Peck Reservation intend to utilize surface hydrocarbon exploration techniques for future identification and confirmation of oil and gas prospects.

Lawrence M. Monson

2003-06-30T23:59:59.000Z

411

Baltimore County - Wind Ordinance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baltimore County - Wind Ordinance Eligibility Agricultural Residential Savings For Wind Buying & Making Electricity Program Information Maryland Program Type Siting and...

412

San Diego County - Wind Regulations (California) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Regulations (California) San Diego County - Wind Regulations (California) < Back Eligibility Commercial Industrial Residential Savings Category Wind Buying & Making...

413

Sullivan County, Pennsylvania: Energy Resources | Open Energy...  

Open Energy Info (EERE)

Climate Zone Subtype A. Places in Sullivan County, Pennsylvania Dushore, Pennsylvania Eagles Mere, Pennsylvania Forksville, Pennsylvania Laporte, Pennsylvania Retrieved from...

414

San Bernardino County - Green Building Incentive | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County's http:www.sbcounty.govgreencountysbbuildersgreenbuilding.aspx Green Building program will receive accelerated plan review, priority inspections, design...

415

Aspen & Pitkin County - Renewable Energy Mitigation Program ...  

Open Energy Info (EERE)

Colorado Name Aspen & Pitkin County - Renewable Energy Mitigation Program Incentive Type Building Energy Code Applicable Sector Commercial, Residential Eligible Technologies...

416

The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson  

SciTech Connect

This study, sponsored by the U.S. General Services Administrations Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

2013-09-30T23:59:59.000Z

417

Geothermal Direct Use Feasibility Study on the Fort Bidwell Indian Reservation  

Science Conference Proceedings (OSTI)

The Fort Bidwell Indian Reservation (FBIR) is rich in renewable energy resources. Development of its geothermal resources has the potential to profoundly affect the energy and economic future of the FBIC. Geothermal energy can contribute to making the reservation energy self-sufficient and, potentially, an energy exporter. The feasibility study assessed the feasibility of installing a geothermal district heating system to provide low-cost, efficient heating of existing and planned residences, community buildings and water, using an existing geothermal well, FB-3.

Dale Merrick

2007-04-20T23:59:59.000Z

418

Fort Devens: Cold Climate, Energy-Efficient, Market-Rate Townhomes  

SciTech Connect

In 2009, Mass Development issued an RFQ and subsequent RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A).

Zoeller, W.; Slattery, M.; Grab, J.

2013-08-01T23:59:59.000Z

419

Marin County - Green Building Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marin County - Green Building Requirements Marin County - Green Building Requirements Eligibility Commercial Construction Residential Savings For Heating & Cooling Home...

420

Madison County - Wind Energy Systems Ordinance | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Madison County - Wind Energy Systems Ordinance Madison County - Wind Energy Systems Ordinance < Back Eligibility Agricultural Commercial Industrial Residential Savings Category...

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Students from Stafford County University of Kansas  

E-Print Network (OSTI)

Page 1 10/10/12 15:23:31 Students from Stafford County Fall 2012 University of Kansas All Campuses Overall counts include students whose permanent residence or last high school attended is in Stafford from Stafford County. In Fall 2012, KU has 11 students from Stafford County: · 10 undergraduate · 1

Peterson, Blake R.

422

Students from Stafford County University of Kansas  

E-Print Network (OSTI)

Page 1 10/17/11 10:19:19 Students from Stafford County Fall 2011 University of Kansas All Campuses Overall counts include students whose permanent residence or last high school attended is in Stafford students from Stafford County. In Fall 2011, KU has 10 students from Stafford County: · 10 undergraduate KU

Peterson, Blake R.

423

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES  

E-Print Network (OSTI)

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES DIVISION OF ENVIRONMENTAL QUALITY ABOVEGROUND OUTDOOR, M.D., M.P.H. Commissioner SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES #12;Suffolk County Department of Health Services' Aboveground Outdoor Tank and Associated Piping Design Standards _____________________ 1

Homes, Christopher C.

424

Geothermal development plan: Pima County  

DOE Green Energy (OSTI)

The Pima County Area Development evaluated the county-wide market potential for utilizing geothermal energy. The study identified four potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F), and in addition, one area is identified as having a temperature of 147{sup 0}F (297{sup 0}F). Geothermal resources are found to occur in Tucson where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing sector and the existence of major copper mines provide opportunities for the direct utilization of geothermal energy. However, available water supplies are identified as a major constraint to projected growth. The study also includes a regional energy analysis, future predictions for energy consumption and energy prices. A major section of the report is aimed at identifying potential geothermal users in Pima County and providing projections of maximum economic geothermal utilization. The study identifies 115 firms in 32 industrial classes that have some potential for geothermal use. In addition, 26 agribusiness firms were found in the county.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

425

Weakly Charged Cationic Nanoparticles Induce DNA Bending and Strand Separation  

SciTech Connect

The understanding of interactions between double stranded (ds) DNA and charged nanoparticles will have a broad bearing on many important applications from drug delivery [ 1 4 ] to DNAtemplated metallization. [ 5 , 6 ] Cationic nanoparticles (NPs) can bind to DNA, a negatively charged molecule, through a combination of electrostatic attraction, groove binding, and intercalation. Such binding events induce changes in the conformation of a DNA strand. In nature, DNA wraps around a cylindrical protein assembly (diameter and height of 6 nm) [ 7 ] with an 220 positive charge, [ 8 ] creating the complex known as chromatin. Wrapping and bending of DNA has also been achieved in the laboratory through the binding of highly charged species such as molecular assemblies, [ 9 , 10 ] cationic dendrimers, [ 11 , 12 ] and nanoparticles. [ 13 15 ] The charge of a nanoparticle plays a crucial role in its ability to induce DNA structural changes. If a nanoparticle has a highly positive surface charge density, the DNA is likely to wrap and bend upon binding to the nanoparticle [ 13 ] (as in the case of chromatin). On the other hand, if a nanoparticle is weakly charged it will not induce dsDNA compaction. [ 9 , 10 , 15 ] Consequently, there is a transition zone from extended to compact DNA conformations which depends on the chemical nature of the nanoparticle and occurs for polycations with charges between 5 and 10. [ 9 ] While the interactions between highly charged NPs and DNA have been extensively studied, the processes that occur within the transition zone are less explored.

Railsback, Justin [North Carolina State University; Singh, Abhishek [North Carolina State University; Pearce, Ryan [North Carolina State University; McKnight, Timothy E [ORNL; Collazo, Ramon [North Carolina State University; Sitar, Zlatko [ORNL; Yingling, Yaroslava [North Carolina State University; Melechko, Anatoli Vasilievich [ORNL

2012-01-01T23:59:59.000Z

426

Primary coolant chemistry of the Peach Bottom and Fort St. Vrain high-temperature gas-cooled reactors  

Science Conference Proceedings (OSTI)

The chemical impurities in the primary coolants of the Peach Bottom and Fort St. Vrain reactors are discussed. The impurity mixtures in the two plants were quite different because the sources of the impurities were different. In the Peach Bottom reactor, the impurities were dominated by H/sub 2/ and CH/sub 4/, which are decomposition products of oil. In the Fort St. Vrain reactor, there were high levels of CO, CO/sub 2/, and H/sub 2/O. Although oil ingress at Peach Bottom created carbon deposits on virtually all surfaces, its effect on reactor operation was negligible. Slow outgassing of water from the thermal insulation at Fort St. Vrain caused delays in reactor startup. The overall graphite oxidation in both plants was negligible.

Burnette, R.D.; Baldwin, N.L.

1980-11-01T23:59:59.000Z

427

Fort Irwin integrated resource assessment. Volume 3: Sitewide Energy Project identification for buildings and facilities  

SciTech Connect

The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.

Keller, J.M.; Dittmer, A.L.; Elliott, D.B.; McMordie, K.L.; Richman, E.E.; Stucky, D.J.; Wahlstrom, R.R.; Hadley, D.L.

1995-02-01T23:59:59.000Z

428

Modeling soil quality thresholds to ecosystem recovery at Fort Benning, GA, USA  

SciTech Connect

The objective of this research was to use a simple model of soil carbon (C) and nitrogen (N) dynamics to predict nutrient thresholds to ecosystem recovery on degraded soils at Fort Benning, Georgia, in the southeastern USA. Artillery, wheeled, and tracked vehicle training at military installations can produce soil disturbance and potentially create barren, degraded soils. Ecosystem reclamation is an important component of natural resource management at military installations. Four factors were important to the development of thresholds to recovery of aboveground biomass on degraded soils: (1) initial amounts of aboveground biomass, (2) initial soil C stocks (i.e., soil quality), (3) relative recovery rates of biomass, and (4) soil sand content. Forests and old fields on soils with varying sand content had different predicted thresholds for ecosystem recovery. Soil C stocks at barren sites on Fort Benning were generally below predicted thresholds to 100% recovery of desired future ecosystem conditions defined on the basis of aboveground biomass. Predicted thresholds to ecosystem recovery were less on soils with more than 70% sand content. The lower thresholds for old field and forest recovery on more sandy soils were apparently due to higher relative rates of net soil N mineralization. Calculations with the model indicated that a combination of desired future conditions, initial levels of soil quality (defined by soil C stocks), and the rate of biomass accumulation determine the predicted success of ecosystem recovery on disturbed soils.

Garten Jr, Charles T [ORNL; Ashwood, Tom L [ORNL

2004-12-01T23:59:59.000Z

429

Effect of military training on indicators of soil quality at Fort Benning, Georgia  

SciTech Connect

The purpose of this research was to investigate the effects of soil disturbance on several key indicators of soil quality at Fort Benning, Georgia. Military activities at Fort Benning that result in soil disturbance include infantry, artillery, wheeled, and tracked vehicle training. Soil samples were collected along a disturbance gradient that included: (1) reference sites, (2) light military use, (3) moderate military use, (4) heavy military use, and (5) remediated sites. With the exception of surface soil bulk density, measured soil properties at reference and light use sites were similar. Relative to reference sites, greater surface soil bulk density, lower soil carbon concentrations, and less carbon and nitrogen in particulate organic matter (POM) were found at moderate use, heavy use, and remediated sites. Studies along a pine forest chronosequence indicated that carbon stocks in POM gradually increased with stand age. An analysis of soil C:N ratios, as well as soil carbon concentrations and stocks, indicated a recovery of soil quality at moderate military use and remediated sites relative to heavy military use sites. Measurements of soil carbon and nitrogen are ecological indicators that can be used by military land managers to identify changes in soil from training activities and to rank training areas on the basis of soil quality.

Garten Jr, Charles T [ORNL; Ashwood, Tom L [ORNL; Dale, Virginia H [ORNL

2003-08-01T23:59:59.000Z

430

Seeing Savings from an ESPC Project in Fort Polk's Utility Bills  

SciTech Connect

Federal agencies have implemented many energy efficiency projects over the years with direct funding or alternative financing vehicles such as energy savings performance contracts (ESPCs). While it is generally accepted that these projects save energy and costs, the savings are usually not obvious in the utility bills. This is true for many valid technical reasons, even when savings are verified in other ways to the highest degree of certainty. However, any perceived deficiency in the evidence for savings is problematic when auditors or other observers evaluate the outcome of energy projects and the achievements of energy management programs. This report discusses under what circumstances energy savings should or should not be evident in utility bills. In the special case of a large ESPC project at the Army's Fort Polk, the analysis of utility bills carried out by the authors does unequivocally confirm and quantify savings. The data requirements and methods for arriving at definitive answers through utility bill analysis are demonstrated in our discussion of the Fort Polk project. The following paragraphs address why the government generally should not expect to see savings from ESPC projects in their utility bills. We also review lessons learned and best practices for measurement and verification (M&V) that can assure best value for the government and are more practical, straightforward, and cost-effective than utility bill analysis.

Shonder, J.A.

2005-03-08T23:59:59.000Z

431

Shear and Bending Fatigue Failure of Lead Free Solder Joint and ...  

Science Conference Proceedings (OSTI)

Among many mechanisms leading to solder joint failure, the fracture by cyclic bending, shear, and shock load is particularly concerned. Conventionally, those...

432

Strain-rate Sensitivity in the Bending Strength of a Forged ...  

Science Conference Proceedings (OSTI)

Abstract Scope, The strain rate sensitivity of bending strength is analyzed for a forged turbostratic-carbon fiber, reinforced epoxy-resin composite (FTCFC).

433

A Study on Bending Deformation Behavior of Ni -Based DS and SC ...  

Science Conference Proceedings (OSTI)

based superalloys used for gas turbine components because bending stresses are often observed in some critical portions of gas turbine blades and vanes.

434

Bending of metal-filled carbon nanotube under electron beam irradiation  

Science Conference Proceedings (OSTI)

Electron beam irradiation induced, bending of Iron filled, multiwalled carbon nanotubes is reported. Bending of both the carbon nanotube and the Iron contained within the core was achieved using two approaches with the aid of a high resolution electron microscope (HRTEM). In the first approach, bending of the nanotube structure results in response to the irradiation of a pristine kink defect site, while in the second approach, disordered sites induce bending by focusing the electron beam on the graphite walls. The HRTEM based in situ observations demonstrate the potential for using electron beam irradiation to investigate and manipulate the physical properties of confined nanoscale structures.

Misra, Abha [Department of Instrumentation and Applied Physics, Indian Institute of Science, Bangalore, Karnataka, 560012 (India)

2012-03-15T23:59:59.000Z

435

Ultrafast dynamics of liquid water: Frequency fluctuations of the OH stretch and the HOH bend  

SciTech Connect

Frequency fluctuations of the OH stretch and the HOH bend in liquid water are reported from the third-order response function evaluated using the TTM3-F potential for water. The simulated two-dimensional infrared (IR) spectra of the OH stretch are similar to previously reported theoretical results. The present study suggests that the frequency fluctuation of the HOH bend is faster than that of the OH stretch. The ultrafast loss of the frequency correlation of the HOH bend is due to the strong couplings with the OH stretch as well as the intermolecular hydrogen bond bend.

Imoto, Sho; Xantheas, Sotiris S.; Saito, Shinji

2013-07-28T23:59:59.000Z

436

County Wind Ordinance Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Wind Ordinance Standards County Wind Ordinance Standards County Wind Ordinance Standards < Back Eligibility Agricultural Commercial Industrial Local Government Residential Savings Category Wind Buying & Making Electricity Program Info State California Program Type Solar/Wind Permitting Standards Provider California Energy Commission [http://www.leginfo.ca.gov/pub/09-10/bill/asm/ab_0001-0050/ab_45_bill_200... Assembly Bill 45] of 2009 authorized counties to adopt ordinances to provide for the installation of small wind systems (50 kW or smaller) outside urbanized areas but within the county's jurisdiction. The bill also addressed specific aspects of a typical wind ordinance and established the limiting factors by which a county's wind ordinance can be no more restrictive. Counties may freely make more lenient ordinances, but AB 45

437

Microsoft Word - BigBendSootblowerPPA_Final_061306.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6/1234 6/1234 Big Bend Power Station Neural Network-Sootblower Optimization A DOE Assessment June 2006 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory National Energy Technology Laboratory Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name,

438

Eagle County - Eagle County Efficient Building Code (ECO-Green Build) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eagle County - Eagle County Efficient Building Code (ECO-Green Eagle County - Eagle County Efficient Building Code (ECO-Green Build) Eagle County - Eagle County Efficient Building Code (ECO-Green Build) < Back Eligibility Commercial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Colorado Program Type Building Energy Code Provider Eagle County In an effort to reduce county-wide energy consumption and improve the environment, Eagle County established their own efficient building code (ECO-Green Build) which applies to all new construction and renovations/additions over 50% of the existing floor area of single-family and multifamily residences, and commercial buildings.

439

R[CIPIENT:Loudoun County  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loudoun County Loudoun County u.s. DEPARTl\ IENT OF ENER GY EERE PROJECT MANAG EMENT CENTER NEPA DETERl\lINATION PROJEcr TITLE: EECBG Funded Projects - SOW (S) Page I of2 STATE: VA Funding Opportunity Announcement Number Pr(l(urement Instrument Number NEPA Control Number elD Number DE-EEOO00868 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45t.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

440

R[CIPIENT:Pima County  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pima County Pima County u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlHINATION PROJECf TITLE: Activity#13 Garage and Shops Page 1 01'2 STATE: AZ. Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOD13 DE-EEOOO08S2 GFO-O000852-OO8 0 Based on my review orlhe information concerning the proposed action, as NEPA CompliJmce Officer (authorized under DOE Order 45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of polentiatly harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Benton County | Open Energy Information  

Open Energy Info (EERE)

Benton County Benton County Place Tennessee Utility Id 1578 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GSA 1 General Power Commercial GSA 2 General Power Commercial GSA 3 General Power Commercial GSB Industrial General Power Service- TDGSA-VULCAN Industrial Outdoor Lighting Service Lighting RS Residential Residential SMSB Industrial SMSC Industrial SMSD Industrial WS-DE Commercial WS-MTOU Wholesale Average Rates Residential: $0.1030/kWh Commercial: $0.1110/kWh Industrial: $0.0875/kWh References

442

Fort Huachuca Water Awareness Program: Best Management Practice Case Study #2: Information and Education Programs (Revised), Federal Energy Management Program (FEMP) (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Army Fort Huachuca contracted the University of Army Fort Huachuca contracted the University of Arizona Cooperative Extension to provide comprehensive water and energy conservation awareness programs under its Water Wise and Energy Smart (WWES) program. Ongoing since 1998, this program provides outreach, education, and services to approximately 14,000 Fort Huachuca military and civilian employees and their families. Fort Huachuca is home of the U.S. Army Intelligence Center, Network Enterprise Technology Command/9th Army Signal Command, Joint Interoperability Test Command, and the Electronic Proving Ground. The military base encompasses approximately 78,000 acres and just over eight million square feet of real property. Fort Huachuca is located at the base of the Huachuca Moun- tains and adjacent to the City of Sierra Vista near Tucson,

443

Fort Huachuca Water Awareness Program: Best Management Practice Case Study #2: Information and Education Programs (Revised), Federal Energy Management Program (FEMP) (Fact Sheet)  

NLE Websites -- All DOE Office Websites (Extended Search)

Army Fort Huachuca contracted the University of Army Fort Huachuca contracted the University of Arizona Cooperative Extension to provide comprehensive water and energy conservation awareness programs under its Water Wise and Energy Smart (WWES) program. Ongoing since 1998, this program provides outreach, education, and services to approximately 14,000 Fort Huachuca military and civilian employees and their families. Fort Huachuca is home of the U.S. Army Intelligence Center, Network Enterprise Technology Command/9th Army Signal Command, Joint Interoperability Test Command, and the Electronic Proving Ground. The military base encompasses approximately 78,000 acres and just over eight million square feet of real property. Fort Huachuca is located at the base of the Huachuca Moun- tains and adjacent to the City of Sierra Vista near Tucson,

444

Contour Ripping and Composted Dairy Manure for Erosion Control on Fort Hood Military Installation, Texas  

E-Print Network (OSTI)

Training activities on the Fort Hood Military Installation have imposed serious impacts to its grass-dominated landscape. Six decades of tracked vehicle impacts have caused soil compaction and vegetation reduction which has lead to severe surface erosion. This investigation examined two conservation practices directed at improving and creating sustainable training conditions on Fort Hood training lands, contour ripping and the application of composted dairy manure. The application of composted dairy manure may increase vegetation, while contour ripping may decrease discharge, both of which will lead to a decrease in erosion. Three small 0.30 ha watersheds were established on Fort Hood in January 2005. Each watershed had 0.46 m berms installed on all four sides with a 0.305 m H-flume and was equipped with automated storm sampling equipment. Soil samples were collected prior to any treatments, and twice after compost applications. Discharge and precipitation was collected continuously on each watershed. Stormwater samples were collected during storm events and analyzed for water quality parameters. Water quality samples, discharge and precipitation records were collected between January 2005 and July 2007. Three composted dairy manure application rates at 0, 28 and 57 m3 ha-1 were applied on watersheds C0, C1 and C2, respectively; watersheds were evaluated for effects on NO3 and soluble reactive phosphates (SRP) concentrations and loadings in storm events and on stormwater discharge. Twenty two months after the initial compost application, the two previously composted watersheds (C1 and C2) were treated with contour ripping and C2 received a second compost application. The compost application caused the spikes in NO3 and SRP concentrations and loads immediately after application. Both NO3 and SRP concentrations decreased as the number of days from application increased. Compost application did not appear to have an effect on the discharge from watersheds. Contour ripping had a significant effect on stormwater discharge. Contour ripping decreased discharge by 74 and 80% on C1 and C2, respectively when compared to the untreated control (C0).

Prcin, Lisa J.

2009-05-01T23:59:59.000Z

445

Effects of supercritical carbon dioxide treatment on bending properties of micro-sized SU-8 Specimens  

Science Conference Proceedings (OSTI)

The bending properties of micro-sized photoresist patterns are quantitatively evaluated using micro-sized SU-8 cantilever type test specimens to clarify the effects of supercritical carbon dioxide-treatment (ScCO"2-treatment). The SU-8 specimens were ... Keywords: Bending strength, Degree of crosslinking, Micro-sized materials, Photoresist, SU-8, Supercritical carbon dioxide

Chiemi Ishiyama; Tso-Fu Mark Chang; Masato Sone

2011-08-01T23:59:59.000Z

446

Bending Burning Matches and Crumpling Burning Paper Texas A&M University  

E-Print Network (OSTI)

Bending Burning Matches and Crumpling Burning Paper Zeki Melek Texas A&M University Department burning. Specifically, we can simulate the bending of burning matches, and the folding of burning paper interactively. 1 Introduction We present a simple method to increase the realism of the simu- lation of burning

Keyser, John

448

Fort Lewis, Yakima Firing Center, and Vancouver Barracks/Camp Bonneville basewide energy use plan; executive summary. Final report  

SciTech Connect

This Executive Summary presents an overview of a series of studies, mostly energy related, of Fort Lewis, Yakima Firing Center, Vancouver Barracks, and Camp Bonneville. Collectively, the work is known as the Basewide Energy Use Plan and is a part of the Energy Conservation Investment Program (ECIP).

Smiley, D.P.

1984-03-01T23:59:59.000Z

449

Quality site seasonal report, Fort Devens Launderette, SFBP (Solar in Federal Buildings Program) 1751, December 1984 through June 1985  

DOE Green Energy (OSTI)

The active solar Domestic Hot Water (DHW) system at the Fort Devens Launderette was designed and constructed as part of the Solar in Federal Buildings Program (SFBP). This retrofitted system was one of eight systems selected for quality monitoring. The purpose of this monitoring effort was to document the performance of quality state-of-the-art solar systems in large federal buildings. The launderette is part of the Post Exchange complex at the Fort Devens Army Post in Fort Devens, Massachusetts. The solar system preheats hot water for the coin operated laundry which has an estimated 25,000 customers per year. There are 108 collector panels comprising the 2563-square foot collector array. Collected solar energy is stored in a 3800-gallon tank. Propylene glycol is used to protect the solar array from freezing. Two immersed heat exchangers provide heat transfer from the propylene glycol to directly heat the DHW supply water in the storage tank. Auxiliary energy is supplied by gas and oil boilers. This solar system can be considered one of a kind and as such is a prototype. The lessons learned from building and operating this system should be used to correct design deficiencies and improve the performance of future solar systems for this application. Highlights of the system performance at the Fort Devens Launderette solar system during the December 1984 through June 1985 monitoring period are presented in this report.

Logee, T.L.

1987-10-15T23:59:59.000Z

450

Fort Campbell, Kentucky A Forester position is available with the Center for Environmental Management of Military Lands. This position is  

E-Print Network (OSTI)

and Forest Management Plan. · Integrate military training support with habitat management, sustainable timber · Experience in the design and execution of forest inventories · Experience in forest inventory data analysis for Environmental Management of Military Lands. This position is located at Fort Campbell, Kentucky. ORGANIZATION

451

Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson  

Science Conference Proceedings (OSTI)

This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.; Kreyling, Sean J.; Schneider, Kevin P.

2013-09-01T23:59:59.000Z

452

Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program  

SciTech Connect

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.B.

1993-08-01T23:59:59.000Z

453

Assessment of Hydrocarbon Seepage on Fort Peck Reservation, Northeast Montana: A Comparison of Surface Exploration Techniques  

Science Conference Proceedings (OSTI)

Surface exploration techniques have been employed in separate study areas on the Fort Peck Reservation in northeastern Montana. Anomalies associated with hydrocarbon seepage are documented in all three areas and a variety of surface exploration techniques can be compared. In a small area with established production, head gas and thermal desorption methods best match production; other methods also mapped depletion. In a moderate-size area that has prospects defined by 3D seismic data, head gas along with microbial, iodine, and Eh soil anomalies are all associated with the best hydrocarbon prospect. In a large area that contains many curvilinear patterns observed on Landsat images, results are preliminary. Reconnaissance mapping of magnetic susceptibility has identified a potential prospect; subsequent soil gas and head gas surveys suggest hydrocarbon potential.

Monson, Lawrence M.

2002-09-09T23:59:59.000Z

454

Multielement geochemistry of three geothermal wells, Cove Fort-Sulphurdale geothermal area, Utah  

DOE Green Energy (OSTI)

Multielement geochemical analysis of drill cuttings from three geothermal wells, Utah State 42-7, Utah State 31-33 and Forminco No. 1, in the Cove Fort-Sulphurdale KGRA, Utah, demonstrates that the distributions of different elements are the result of different chemical processes operating throughout the geologic history of the area. Statistical analysis of geochemical-data distributions confirm the presence of several distinct element associations. Of the 36 elements determined on the samples, 12 (V, Mo, Cd, Ag, Au, Sb, Bi, U, Te, Sn, B and Th) were present in concentrations at or below detection levels. Of the remaining 24 elements, only 3 (Ni, Co and Zr) are lognormally distributed. Distributions for the remaining elements are of aggregate populations which represent background, mineralization or other processes.

Christensen, O.D.

1982-09-01T23:59:59.000Z

455

EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties,...

456

Franklin County Wind LLC | Open Energy Information  

Open Energy Info (EERE)

Franklin County Wind LLC Franklin County Wind LLC Facility Franklin County Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Franklin County Wind LLC Developer Franklin County Wind LLC Energy Purchaser Merchant (MISO) Location Franklin County IA Coordinates 42.61481487°, -93.36564124° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.61481487,"lon":-93.36564124,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

457

Talbot County DPW | Open Energy Information  

Open Energy Info (EERE)

Talbot County DPW Talbot County DPW Jump to: navigation, search Name Talbot County DPW Facility Talbot County DPW Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Talbot County DPW Energy Purchaser Talbot County DPW Location Easton MD Coordinates 38.8182443°, -76.0331583° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8182443,"lon":-76.0331583,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

458

The evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana: Final Report  

SciTech Connect

This report documents an independent evaluation of an energy retrofit of 4,003 family housing units at Fort Polk, Louisiana, under an energy savings performance contract (ESPC). Replacement of the heating, cooling, and water heating systems in these housing units with geothermal heat pumps (GHPs) anchored the retrofit; low-flow shower heads and compact fluorescent lighting were also installed, as well as attic insulation where needed. Statistically valid findings indicate that the project will save 25.8 million kWh, or 32.5% of the pre-retrofit whole-community electrical consumption, and 100% of the whole-community natural gas previously used for space conditioning and water heating (260,000 therms) in a typical meteorological year. At the end-use level, the GHPs were found to save about 42% of the pre-retrofit electrical consumption for heating, cooling, and water heating in housing units that were all-electric in the pre-retrofit period. This report also demonstrates an improved method of predicting energy savings. Using an engineering model calibrated to pre-retrofit energy use data collected in the field, the method predicted actual energy savings on one of the electric feeders at Fort Polk with a very high degree of accuracy. The accuracy of this model was in turn dependent on data-calibrated models of the geothermal heat pump and ground heat exchanger that are described in this report. In addition this report documents the status of vertical borehole ground heat exchanger (BHEx) design methods at the time this project was designed, and demonstrates methods of using data collected from operating GHP systems to benchmark BHEx design methods against a detailed engineering model calibrated to date. The authors also discuss the ESPC`s structure and implementation and how the experience gained here can contribute to the success of future ESPCs.

Hughes, P.J.; Shonder, J.A.

1998-03-01T23:59:59.000Z

459

Montgomery County - Green Power Purchasing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Montgomery County - Green Power Purchasing Montgomery County - Green Power Purchasing Montgomery County - Green Power Purchasing < Back Eligibility Local Government Savings Category Bioenergy Buying & Making Electricity Solar Water Wind Program Info State Maryland Program Type Green Power Purchasing Provider Montgomery County In October 2000, a group six county agencies, consisting of Montgomery County, Montgomery County Public Schools, Montgomery County Housing Opportunities Commission, Montgomery College, the Washington Suburban Sanitary Commission, and the Maryland-National Capital Park and Planning Commission, began purchasing power on a competitive basis. In March 2003, the county's energy policy was amended to incorporate the purchase of renewable energy and to expand energy-efficiency efforts. This resolution

460

Building Green in Greensburg: Kiowa County Courthouse  

Energy.gov (U.S. Department of Energy (DOE))

This poster highlights energy efficiency, renewable energy, and sustainable features of the renovated high-performing Kiowa County Courthouse building in Greensburg, Kansas.

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Aspen & Pitkin County - Renewable Energy Mitigation Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Buying & Making Electricity Water Heating Wind Program Information Colorado Program Type Building Energy Code The City of Aspen and Pitkin County have adopted the 2009...

462

County Land Preservation and Use Commissions (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance creates Land Preservation and Use Commissions in each county to provide for the orderly use and development of land, to protect agricultural land from nonagricultural development,...

463

Charles County - Agricultural Preservation Districts - Renewable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Type Siting & Permitting Charles County provides that producing energy "from solar, wind, biomass, and farm waste and residue crops" is a permitted agricultural use in areas...

464

Clallam County PUD- Residential Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

Clallam County PUD offers a variety of rebates for residential customers for energy efficiency improvements. Eligible measures and incentives include window upgrades, insulation, air and duct...

465

Biostratigraphy of Jonah quadrangle, Williamson County, Texas.  

E-Print Network (OSTI)

??This paper presents a zonation of the Austin chalk and the Burditt marl, divisions of the Austin group in the Jonah quadrangle, Williamson County, Texas. (more)

Marks, Edward, 1926-

2011-01-01T23:59:59.000Z

466

Forrest County Geothermal Energy Project Geothermal Project ...  

Open Energy Info (EERE)

of replacing the existing air cooled chiller with geothermal water to water chillers for energy savings at the Forrest County Multi Purpose Center. The project will also replace...

467

Humboldt County RESCO Project | Open Energy Information  

Open Energy Info (EERE)

RESCO Project RESCO Project Jump to: navigation, search Name Humboldt County RESCO Project Agency/Company /Organization Redwood Coast Energy Authority Focus Area People and Policy, Renewable Energy, Biomass - Anaerobic Digestion, Biomass - Biofuels, Biomass, Biomass - Biomass Combustion, Biomass - Biomass Gasification, Biomass - Biomass Pyrolysis, Biomass - Landfill Gas, Solar, - Solar Pv, Biomass - Waste To Energy, Wind Phase Create a Vision Resource Type Technical report Availability Free - Publicly Available Publication Date 4/1/2010 Website http://cal-ires.ucdavis.edu/fi Locality Humboldt County References Humboldt County RESCO Project[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 Related Tools 5 References Overview This introductory document outline's Humboldt county's vision for a local

468

Geothermal development plan: Pinal county  

DOE Green Energy (OSTI)

Wells drilled in the county provide evidence of geothermal energy sufficient for process heat and space heating and cooling applications. Annual energy consumption was estimated for industries whose process heat requirements are less than 105/sup 0/C (221/sup 0/F). This information was then used to model the introduction of geothermal energy into the process heat market. Also, agriculture and agribusiness industries were identified. Many of these are located on or near a geothermal resource and might be able to utilize geothermal energy in their operations.

White, D.H.

1981-01-01T23:59:59.000Z

469

Passive gust load alleviation through bend-twist coupling of composite beams on typical commercial airplane wings  

E-Print Network (OSTI)

The effects of bend-twist coupling on typical commercial airplane wings are evaluated. An analytical formulation of the orthotropic box beam bending stiffness matrix is derived by combining Euler-Bernoulli beam theory and ...

Gauthier Perron, Sbastien

2012-01-01T23:59:59.000Z

470

Geothermal development plan: Pinal County  

SciTech Connect

The Pinal County Area Development Plan evaluated the county-wide market potential for utilizing geothermal energy. The study identified three suspected geothermal resource areas with potential 70/sup 0/C (158/sup 0/F) temperatures. In addition, one geothermal test well near Coolidge encountered bottom hole temperatures of 120/sup 0/C (248/sup 0/F) at a depth of 2440 m (8005 ft) and produced 18.3 l/sec (290 gpm). Geothermal resources are found to occur near population centers where average growth rates of 1.5% to 2% per year are expected over the next 40 years. Mining, agriculture and manufacturing are all important sectors of the regional economy and provide opportunities for direct utilization of geothermal energy. A regional energy use analysis includes energy use projections and regional energy price information. Agriculture accounts for 95% of the annual water consumption and predicted decreases in water availability will result in less future agricultural activity. The analysis contains a detailed section matching geothermal resources to potential industrial users. Fourteen firms in 10 industrial classes were identified as having some potential for geothermal energy use. In addition, 25 agricultural firms were identified as having some potential for geothermal use, including the prepared feeds industry.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

471

Richmond City County, Virginia: Energy Resources | Open Energy...  

Open Energy Info (EERE)

City County is a county in Virginia. Its FIPS County Code is 760. It is classified as ASHRAE 169-2006 Climate Zone Number 4 Climate Zone Subtype A. Retrieved from "http:...

472

Bristol County, Rhode Island: Energy Resources | Open Energy...  

Open Energy Info (EERE)

County is a county in Rhode Island. Its FIPS County Code is 001. It is classified as ASHRAE 169-2006 Climate Zone Number 5 Climate Zone Subtype A. Registered Energy Companies in...

473

2008 Florida Youth Tobacco Survey, County Data Book  

E-Print Network (OSTI)

Tobacco Survey County Data Book Florida Department of HealthFlorida County FYTS Data Book Map 2. Percentage of FloridaFlorida County FYTS Data Book Map 3. Percentage of Florida

Florida Department of Health, Brueau of Epidemiology; Crist, Charlie; Viamonte Ros, Ana M M.D., M.P.H.

2009-01-01T23:59:59.000Z

474

Geothermal development issues: Recommendations to Deschutes County  

DOE Green Energy (OSTI)

This report discusses processes and issues related to geothermal development. It is intended to inform planners and interested individuals in Deschutes County about geothermal energy, and advise County officials as to steps that can be taken in anticipation of resource development. (ACR)

Gebhard, C.

1982-07-01T23:59:59.000Z

475

Commodity Flow Study - Clark County, Nevada, USA  

Science Conference Proceedings (OSTI)

The United States Department of Energy has designated Clark County, Nevada as an 'Affected Unit of Local Government' due to the potential for impacts by activities associated with the Yucca Mountain High Level Nuclear Waste Repository project. Urban Transit, LLC has led a project team of transportation including experts from the University of Nevada Las Vegas Transportation Research Center to conduct a hazardous materials community flow study along Clark County's rail and truck corridors. In addition, a critical infrastructure analysis has also been carried out in order to assess the potential impacts of transportation within Clark County of high level nuclear waste and spent nuclear fuel to a proposed repository 90 miles away in an adjacent county on the critical infrastructure in Clark County. These studies were designed to obtain information relating to the transportation, identification and routing of hazardous materials through Clark County. Coordinating with the United States Department of Energy, the U.S. Department of Agriculture, the U. S. Federal Highway Administration, the Nevada Department of Transportation, and various other stakeholders, these studies and future research will examine the risk factors along the entire transportation corridor within Clark County and provide a context for understanding the additional vulnerability associated with shipping spent fuel through Clark County. (authors)

Conway, S.Ph.D. [Urban Environmental Research LLC, Las Vegas, NV (United States); Navis, I. [AICP Planning Manager, Clark County Nuclear Waste Division, Department of Comprehensive Planning, Las Vegas, NV (United States)

2008-07-01T23:59:59.000Z

476

Factors influencing county level household fuelwood use  

Science Conference Proceedings (OSTI)

This study explains household fuelwood consumption behavior at the county level by linking it to economic and demographic conditions in counties. Using this link, counties are identified where potential fuelwood use problems and benefits are greatest. A probit equation estimates household probability of wood use (percent woodburners in a county heating degree days, household income, nonwood fuel price, fuelwood price, percent forest land, population density, and fraction of households using various types of heating equipment. A linear-in-parameters equation estimates average wood consumed by a woodburner based on county heating degree days, household income, percent forest land, and price of nonwood fuel divided by fuelwood price. Parameters are estimated using fuelwood use data for individual households from a 1908-81 nationwide survey. The probit equation predicts percentage of wood burns well over a wide range of county conditions. The wood consumption equation overpredicts for counties with high income and high population density (over 6000 persons per square mile). The model shows average woodburning per household over all households decreases with increasing population density, and the influence of county economic characteristics varies with density.

Skog, K.E.

1986-01-01T23:59:59.000Z

477

EA-1852: Cloud County Community College Wind Energy Project, Cloud County,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Cloud County Community College Wind Energy Project, Cloud 2: Cloud County Community College Wind Energy Project, Cloud County, Kansas EA-1852: Cloud County Community College Wind Energy Project, Cloud County, Kansas Summary This EA evaluates the environmental impacts of a proposal to authorize the expenditure of federal funds by Cloud County Community College (CCCC) for a wind energy project. CCCC has installed three wind turbines and proposes to install a fourth turbine on their campus in Concordia, Kansas, for use in their wind energy training curriculum and to provide electricity for their campus. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download January 10, 2011 EA-1852: Notice of Scoping Cloud County Community College Wind Energy Technology Project, Cloud

478

Effects of Heavy, Tracked-Vehicle Disturbance on Forest Soil Properties at Fort Benning, Georgia  

Science Conference Proceedings (OSTI)

The purpose of this report is to describe the effects of heavy, tracked-vehicle disturbance on various measures of soil quality in training compartment K-11 at Fort Benning, Georgia. Predisturbance soil sampling in April and October of 2002 indicated statistically significant differences in soil properties between upland and riparian sites. Soil density was less at riparian sites, but riparian soils had significantly greater C and N concentrations and stocks than upland soils. Most of the C stock in riparian soils was associated with mineral-associated organic matter (i.e., the silt + clay fraction physically separated from whole mineral soil). Topographic differences in soil N availability were highly dependent on the time of sampling. Riparian soils had higher concentrations of extractable inorganic N than upland soils and also exhibited significantly greater soil N availability during the spring sampling. The disturbance experiment was performed in May 2003 by driving a D7 bulldozer through the mixed pine/hardwood forest. Post-disturbance sampling was limited to upland sites because training with heavy, tracked vehicles at Fort Benning is generally confined to upland soils. Soil sampling approximately one month after the experiment indicated that effects of the bulldozer were limited primarily to the forest floor (O-horizon) and the surface (0-10 cm) mineral soil. O-horizon dry mass and C stocks were significantly reduced, relative to undisturbed sites, and there was an indication of reduced mineral soil C stocks in the disturbance zone. Differences in the surface (0-10 cm) mineral soil also indicated a significant increase in soil density as a result of disturbance by the bulldozer. Although there was some tendency for greater soil N availability in disturbed soils, the changes were not significantly different from undisturbed controls. It is expected that repeated soil disturbance over time, which will normally occur in a military training area, would simply intensify the changes in soil properties that were measured following a one-time soil disturbance at the K-11 training compartment. The experiment was also useful for identifying soil measurements that are particularly sensitive to disturbance and therefore can be used successfully as indicators of a change in soil properties as a result of heavy, tracked-vehicle traffic at Fort Benning. Measurements related to total O-horizon mass and C concentrations or stocks exhibited changes that ranged from {approx}25 to 75% following the one-time disturbance. Changes in surface (0-10 cm) mineral soil density or measures of surface soil C and N following the disturbance were less remarkable and ranged from {approx}15 to 45% (relative to undisturbed controls). Soil N availability (measured as initial extractable soil N or N production in laboratory incubations) was the least sensitive and the least useful indicator for detecting a change in soil quality. Collectively, the results suggest that the best indicators of a change in soil quality will be found at the soil surface because there were no statistically significant effects of bulldozer disturbance at soil depths below 10 cm.

Garten, C.T.,JR.

2004-05-20T23:59:59.000Z

479

Dane County Landfill | Open Energy Information  

Open Energy Info (EERE)

Dane County Landfill Dane County Landfill Jump to: navigation, search Name Dane County Landfill Facility Dane County Landfill #2 Rodefeld Sector Biomass Facility Type Landfill Gas Location Dane County, Wisconsin Coordinates 43.0186073°, -89.5497632° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0186073,"lon":-89.5497632,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

480

Imperial County geothermal development annual meeting: summary  

DOE Green Energy (OSTI)

All phases of current geothermal development in Imperial County are discussed and future plans for development are reviewed. Topics covered include: Heber status update, Heber binary project, direct geothermal use for high-fructose corn sweetener production, update on county planning activities, Brawley and Salton Sea facility status, status of Imperial County projects, status of South Brawley Prospect 1983, Niland geothermal energy program, recent and pending changes in federal procedures/organizations, plant indicators of geothermal fluid on East Mesa, state lands activities in Imperial County, environmental interests in Imperial County, offshore exploration, strategic metals in geothermal fluids rebuilding of East Mesa Power Plant, direct use geothermal potential for Calipatria industrial Park, the Audubon Society case, status report of the Cerro Prieto geothermal field, East Brawley Prospect, and precision gravity survey at Heber and Cerro Prieto geothermal fields. (MHR)

Not Available

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fort bend county" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Environmental assessment: Deaf Smith County site, Texas  

SciTech Connect

In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.

1986-05-01T23:59:59.000Z

482

SHASTA COUNTY The Shasta County Jail is a 115,035 square-foot facility located in Redding. Built in  

E-Print Network (OSTI)

SHASTA COUNTY The Shasta County Jail is a 115,035 square-foot facility located in Redding. Built in 1984, this facility has an 11-story jail wing attached to a two-story County administrative wing

483

Grundy County Rural Elec Coop | Open Energy Information  

Open Energy Info (EERE)

County Rural Elec Coop Jump to: navigation, search Name Grundy County Rural Elec Coop Place Iowa Utility Id 7864 Utility Location Yes Ownership C NERC Location MRO Activity...

484

Funding for state, city, and county governments in the state...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funding for state, city, and county governments in the state includes: Funding for state, city, and county governments in the state includes: A chart detailling the funding for...

485

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

NLE Websites -- All DOE Office Websites (Extended Search)

Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm...

486

Florida County Helping Homeowners Save Energy and Money | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Florida County Helping Homeowners Save Energy and Money Florida County Helping Homeowners Save Energy and Money March 9, 2011 - 1:23pm Addthis Jennifer Holman Project Officer,...

487

Elko County School District District Heating Low Temperature...  

Open Energy Info (EERE)

County School District District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Elko County School District District Heating Low Temperature Geothermal...

488

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA August 2010 Jody K. Nelson Vascular...

489

Pages that link to "Camas County, Idaho" | Open Energy Information  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Pages that link to "Camas County, Idaho" Camas County, Idaho Jump to: navigation, search What links here Page: Camas...

490

Pages that link to "Bonner County, Idaho" | Open Energy Information  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Pages that link to "Bonner County, Idaho" Bonner County, Idaho Jump to: navigation, search What links here Page: Bonner...

491

Pages that link to "Clearwater County, Idaho" | Open Energy Informatio...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Pages that link to "Clearwater County, Idaho" Clearwater County, Idaho Jump to: navigation, search What links here Page:...

492

Pages that link to "Clark County, Idaho" | Open Energy Information  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Pages that link to "Clark County, Idaho" Clark County, Idaho Jump to: navigation, search What links here Page: Clark...

493

Wabash County REMC - Residential Geothermal and Air-source Heat...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Wabash County REMC - Residential Geothermal and Air-source Heat Pump Rebate Program Wabash County REMC - Residential Geothermal...

494

White County REMC - Residential Geothermal Heat Pump Rebate Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings White County REMC - Residential Geothermal Heat Pump Rebate Program White County REMC - Residential Geothermal Heat Pump Rebate...

495

Baltimore County - Property Tax Credit for Solar and Geothermal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Savings Baltimore County - Property Tax Credit for Solar and Geothermal Devices (Maryland) Baltimore County - Property Tax Credit for Solar and Geothermal...

496

Anne Arundel County - Solar and Geothermal Equipment Property...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Anne Arundel County - Solar and Geothermal Equipment Property Tax Credit Anne Arundel County - Solar and Geothermal Equipment...

497

Anne Arundel County - Solar and Geothermal Equipment Property...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits Anne Arundel County - Solar and Geothermal Equipment...

498

Benton County, Tennessee ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Tennessee ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Benton County, Tennessee ASHRAE Standard ASHRAE 169-2006 Climate Zone Number Climate...

499

Benton County, Minnesota ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Minnesota ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Benton County, Minnesota ASHRAE Standard ASHRAE 169-2006 Climate Zone Number Climate...

500

Adams County, Pennsylvania ASHRAE 169-2006 Climate Zone | Open...  

Open Energy Info (EERE)

Pennsylvania ASHRAE 169-2006 Climate Zone Jump to: navigation, search County Climate Zone Place Adams County, Pennsylvania ASHRAE Standard ASHRAE 169-2006 Climate Zone Number...