Powered by Deep Web Technologies
Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

INSTRUCTIONS for COMPLETING SCHEDULE CARD WEB FORMS  

E-Print Network [OSTI]

Mar 22, 2012 ... Instructions for completing schedule card web forms. The following students are required to complete schedule card web forms. • all returning ...

Kelly Beranger

2012-03-22T23:59:59.000Z

2

Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedules Schedules Schedules Print Current Long-Term Operating Schedule August-December 2013 Upcoming Long-Term Operating Schedule January-July 2014 New! ALS Operating Schedule on Google Calendar Past Long-Term Operating Schedules January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007 July 2006-February 2007 January-June 2006 July-December 2005 January-June 2005 June-December 2004 December 2003-May 2004 June 2003-November 2003 December 2002-May 2003 June 2002-November 2002 December 2001-May 2002 May 2001-December 2001 January 2001-April 2001 July 2000-December 2000 January 2000-June 2000 April 1999-December 1999

3

Continuous Price Regulation to Form the Desired Load Schedule of a Power System  

Science Journals Connector (OSTI)

A price control mechanism is designed to form the ... for a power system. A method of price computation with regard for the fuel consumption of generating units and load types...

G. G. Grebenyuk; M. M. Solov'ev

2004-05-01T23:59:59.000Z

4

The Schedule  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The schedule is one of the building blocks for project development. A schedule helps determine the duration of the project, the critical activities, and when funds are required. This chapter will briefly discuss some scheduling basics.

1997-03-28T23:59:59.000Z

5

Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are in .pdf format) After Hours Access Policy After Hours Request Form Cleanroom Access Procedures for New Users Deposition Request Form Exit Form Flycutting Request Form Hot...

6

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

7

Rate Schedules  

Broader source: Energy.gov [DOE]

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

8

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This...

9

SI Group Scheduling Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Personnel On-Call Page Beamline Validation Schedule Group Organizational Chart Reviews Presentations Group Scheduling Page Project Scheduling Information Ops Scheduling Info Project / Scheduling Info APS fy2005 Annual Schedule ( html ) PSS Validation Schedule APS fy2006 Annual Schedule (html) PSS Validation Teams Latest Machine Studies Schedule (pdf) (html) New Builds Schedule (For SI GROUP Reference Only) Parasitic Beam Operations Schedule Ops Scheduling Page Shutdown Information Work Schedules August/September Shutdown Shutdown Work List Validation Schedule Safety Info Work Request Links ISM Core Functions Enter / Search Work Requests APS Safety Page Modify / Approve Work Requests Radiation Safety Policy APS TMS Training Profiles MSDS Search This page maintained by Joe Budz

10

Rate schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

11

Presentation Schedule  

Broader source: Energy.gov (indexed) [DOE]

Presentation Schedule Presentation Schedule (30 Min) Dave Wade - Dose Comparisons of once-thru and closed fuel cycles. (30 Min) Ralph Bennett - Roadmap Overview (15 Min) Neil Todreas - GRNS Perspectives and Recommendations (75 Min) Neil Todreas / - NERAC DISCUSSION Sal Levy 2 Generation IV Roadmap NERAC Subcommittee (GRNS) Bobby Abrams* Duke Engineering Douglas Chapin MPR Associates B. John Garrick Independent Consultant Dan Kammen University of California- Berkeley 3 Salomon Levy ** Levy & Associates Ted Marston Electrical Power Research Institute Bill Naughton Exelon Neil Todreas ** Massachusetts Institute of Technology * Resigned, July 2002 ** Co-chair GRNS Recruited Working Group Co-Chairs Jack Devine TWG-1 Water Cooled Phil Hildebrandt TWG-2 Gas Cooled Steve Rosen TWG-3 Metal Cooled Bill Rasin

12

Shifts & Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shifts & Schedules This page provides links to the various shifts and schedules that are used by the User ESH Support Group. FC Shift Schedule This page lists the current Operational Shift Schedule for the Floor Coordinators. FC DOR Schedule This page lists the current DOR Schedule for the Floor Coordinators. FC Off Shift Pager Schedule This tool lists the current schedule for the Floor Coordinator carring the 0101 during APS Shutdown periods. Long Range Operations Schedule This page lists the schedule of Operations for the current APS fiscal year. Machine Studies Schedule This page lists the current schedule of Operations for the Accelerator Systems during Machine Studies. PSS Validation Schedule This page lists the beamlines currently scheduled to have their Personnel Safety Systems validated.

13

Transportation Baseline Schedule  

SciTech Connect (OSTI)

The “1999 National Transportation Program - Transportation Baseline Report” presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion “1999 Transportation ‘Barriers’ Analysis” analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The “1999 Transportation Baseline Schedule” (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the “Geologic Repository Disposal” site (GRD).

Fawcett, Ricky Lee; John, Mark Earl

2000-01-01T23:59:59.000Z

14

Implementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers  

E-Print Network [OSTI]

present in traditional non- real time process schedulers. Lottery scheduling enables flexible control over this while maintaining lottery scheduling's flexible control over relative execution rates and loadImplementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers David

15

DOE Administrative Records Schedules Changes | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules DOE Administrative Records Schedules...

16

March 29, 2008 OS:CPU Scheduling 1 CPU Scheduling  

E-Print Network [OSTI]

control of the CPU to the process selected by the short-term scheduler. Its function involves: SwitchingMarch 29, 2008 OS:CPU Scheduling 1 CPU Scheduling #12;March 29, 2008 OS:CPU Scheduling 2 Objectives Basic Concepts + Scheduling Criteria + Scheduling Algorithms + Scheduling Algorithm Evaluation + Summary

Adam, Salah

17

PARS II Training Schedule | Department of Energy  

Office of Environmental Management (EM)

will certify that user to receive a PARS II user account. PARSIITrainingSchedule03-06-2014.pdf More Documents & Publications Slide 1 Slide 1 PARS II Course Registration Form...

18

Disposition Schedules | Department of Energy  

Office of Environmental Management (EM)

Disposition Schedules Disposition Schedules The DOE Records Disposition Schedules provide the authority for the transfer, or disposal of records created and maintained by the...

19

SSRL- Experimental Run Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FY2008 Experimental Run Schedules 2008 Run Ends August 11, 2008. User Operations will resume November 2008. Operating Maintenance Beam Line Schedule FY2009 FY2008 X-ray (1-4,...

20

SRI2007 Conference - Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home Registration Abstract Submission Proceedings Manuscript Review Conference Schedule Poster Session Satellite Workshops Conference Committee Accommodations Vendors Travel tips...

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

A pipeline scheduling model  

E-Print Network [OSTI]

A PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Submitted to the Graduate College of Texas AAM University in partial fulfillment of the requirement for the degree of MASTER QF SCIENCE August 1975 Major Subject: Computing... Science R PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Approved as to style and content by: Chairman of ommittee Member (Head o f Department ) Member August 1975 ABSTRACT A PIPELINE SCHEDULING MODEL (August 1975) Thomas Melvin...

Beatty, Thomas Melvin

2012-06-07T23:59:59.000Z

22

Dynamic Multilevel Hybrid Scheduling Algorithms for Grid Computing  

Science Journals Connector (OSTI)

A ‘Grid’ is an infrastructure for resource sharing. It is used for large-scale data processing, many of the applications being scientific ones. Grid scheduling is a vital component of a Grid infrastructure. Reliability, efficiency (in terms of time consumption) and effectiveness in resource utilization are the desired characteristics of Grid scheduling systems. Many algorithms have been developed for Grid scheduling. In our previous work, we proposed two scheduling algorithms (the Multilevel Hybrid Scheduling Algorithm and the Multilevel Dual Queue Scheduling Algorithm) for optimum utilization of processors in a Grid computing environment. In this paper, we propose two more flavours of Multilevel Hybrid scheduling algorithms; i.e. the Dynamic Multilevel Hybrid Scheduling Algorithm using Median and the Dynamic Multilevel Hybrid Scheduling Algorithm using Square root. We evaluate our proposed Grid scheduling using real workload traces, taken from leading computational centers. The main idea of the proposed algorithms is to execute jobs optimally, i.e. with minimum average waiting, turnaround and response times. An extensive performance comparison is presented using real workload traces to evaluate the efficiency of scheduling algorithms. To facilitate the research, a software tool has been developed which produces a comprehensive simulation of a number of Grid scheduling algorithms. The tool's output is in the form of scheduling performance metrics. The experimental results, based on performance metrics, demonstrate that the performances of our Grid scheduling algorithms give good results. Our proposed scheduling algorithms also support true scalability, that is, they maintain an efficient approach when increasing the number of processors or nodes. This paper also includes a statistical analysis of real workload traces to present the nature and behavior of jobs. Our proposed scheduling algorithms are unique. They have three key features. First, they favor the shortest job for execution. Second, they execute the job on the basis of a dynamic time quantum, to fairly distribute processor time among Grid jobs. A third feature is that they always execute the longest job, thus avoiding starvation.

Syed Nasir Mehmood Shah; Ahmad Kamil Bin Mahmood; Alan Oxley

2011-01-01T23:59:59.000Z

23

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...  

Office of Environmental Management (EM)

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable...

24

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

25

Definition: Dynamic Interchange Schedule Or Dynamic Schedule | Open Energy  

Open Energy Info (EERE)

Schedule Or Dynamic Schedule Schedule Or Dynamic Schedule Jump to: navigation, search Dictionary.png Dynamic Interchange Schedule Or Dynamic Schedule A telemetered reading or value that is updated in real time and used as a schedule in the AGC/ACE equation and the integrated value of which is treated as a schedule for interchange accounting purposes. Commonly used for scheduling jointly owned generation to or from another Balancing Authority Area.[1] Related Terms balancing authority, balancing authority area, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Dynamic_Interchange_Schedule_Or_Dynamic_Schedule&oldid=502492

26

2014 CAMD Users Meeting Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule Friday, April 25th, 2014 LTRC Transportation Training and Education Center (TTEC), 4099 Gourrier Avenue Printable Schedule here 8:00 - 8:30 - REGISTRATION Morning Session...

27

Reclaimer Scheduling: Complexity and Algorithms  

E-Print Network [OSTI]

Feb 17, 2014 ... Abstract: We study a number of variants of an abstract scheduling problem inspired by the scheduling of reclaimers in the stockyard of a coal ...

Enrico Angelelli

2014-02-17T23:59:59.000Z

28

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

29

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Broader source: Energy.gov (indexed) [DOE]

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

30

Administrative Records Schedule: Communication Records | Department...  

Office of Environmental Management (EM)

Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function...

31

Implementing Lottery Scheduling: Matching the Specializations Traditional Schedulers  

E-Print Network [OSTI]

in traditional non­ real time process schedulers. Lottery scheduling enables flexible control over relative. We achieve this while maintaining lottery scheduling's flexible control over relative execution rates a recently troduced proportional­share scheduler that enables flexible control over relative rates which CPU

32

Symmetry in Scheduling Problems  

E-Print Network [OSTI]

Nov 16, 2010 ... one is determining production schedules for identical machines. ...... j(t)) gives the cost of generator j producing pj(t) units of electricity at time t.

2010-11-16T23:59:59.000Z

33

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

34

DOE Records Disposition Schedule Changes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Records Disposition Schedule Changes DOE Records Disposition Schedule Changes Disposition Schedule Changes DOE Records Disposition Schedule Changes More Documents & Publications...

35

JGI - CSP Proposal Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

36

SRS CAB - Meeting Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SRS CAB Meeting Schedule SRS CAB Meeting Schedule Savannah River Site - Citizens Advisory Board 2013 Schedule To join current Online Meetings or view archived Online Meetings click on the buttons in the right-hand column. CAB Full Board and Combined Committees Meetings are not presented in the Online Meeting format. Instructions for Accessing Committee Meetings Online To request a copy of an archived online meeting, scroll down to the date of the meeting you wish to request, and click on the green "Request Archived Online Meeting" button. Your email browser will open and generate a new email to srscitizensadvisoryboard@srs.gov with the committee meeting you wish to request in the subject line. Please, include your name and mailing address in the body of the email. Once we receive the email, we will send

37

NERSC Holiday Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC NERSC Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier (0 Comments) All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on Thursday, January 2. As always, critical system problems may be reported at any time to NERSC Operations at 1-800-666-3772, menu option 1, or 1-510-486-6821. You should also contact Operations if you need to have your password reset (or login failures cleared) over the holidays.

38

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Broader source: Energy.gov (indexed) [DOE]

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

39

GENERAL RECORDS SCHEDULE 1  

Broader source: Energy.gov (indexed) [DOE]

39 39 DEPARTMENT OF ENERGY ADMIN1STRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS June 2007 Revision 2 As do all Administrative Records Schedules (ADMs), ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health. The most important types of records are the Official Personnel Folders, the Service Record Cards, and the Employee Medical Folders. Those for Federal employees are maintained according to The Guide to Personnel Recordkeeping, an Office of Personnel Management directive that prescribes a system of recordkeeping for Federal

40

EGov PMA Scorecard Cost, Schedule & Performance Standard...  

Energy Savers [EERE]

EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule &...

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Proposal Submittal and Scheduling Procedures for Macromolecular  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

42

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

43

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

44

TOWARDS UNIFYING DATABASE SCHEDULING AND  

E-Print Network [OSTI]

1 TOWARDS UNIFYING DATABASE SCHEDULING AND CONCURRENCY CONTROL: A FRONTIER APPROACH Gregory Jones previous work in real-time database concurrency control indexconcur- rency control and scheduling has focused on combiningvariations of traditional concurrency control techniques with real-time scheduling

Rhode Island, University of

45

Optimal Power Schedule for Distributed MIMO Links  

E-Print Network [OSTI]

an integration of link scheduling and power control for MIMOmedium access control, space-time power scheduling. Fig. 1.

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

46

ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services...

47

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

48

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Broader source: Energy.gov (indexed) [DOE]

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

49

BNL | ATF Beam Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beam Schedule (pdf) Beam Schedule (pdf) Sunday Monday Tuesday Wednesday Thursday Friday Saturday 22 1/2 Holiday Holiday 28 January Holiday 4 5 Maintenance 11 12 Maintenance 18 19 Holiday AE52 - DWFA (Euclid), BL2 25 February AE52 - DWFA (Euclid), BL2 1 2 AE50 - PWFA in QNR (UCLA), BL2 8 9 AE50 - PWFA in QNR (UCLA), BL2 15 16 Holiday AE50 - PWFA in QNR (UCLA), BL2 22 March 1 2 AE53 - Nonlinear Compton (UCLA) 8 9 AE53 - Nonlinear Compton (UCLA) 15 16 AE53 - Nonlinear Compton (UCLA) 22 23 29 Sunday Monday Tuesday Wednesday Thursday Friday Saturday User operations (E-beam in use) Ions - Ion generation User operations (laser in use) PWFA - Plasma Wakefield Acceleration User operations (E-beam and laser in use)

50

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

51

2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.  

SciTech Connect (OSTI)

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

52

Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

53

Chemotherapy Operations Planning and Scheduling  

E-Print Network [OSTI]

Feb 12, 2010 ... ning and scheduling methods for chemotherapy patients with the ... growth, control or prevent the spread of cancer cells, and/or relieve cancer ...

2010-02-13T23:59:59.000Z

54

Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

55

Archives and History Office: Records Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Services > Records Schedules Services > Records Schedules Records Schedules Note: Some links on this page open pdf files, which require the free Acrobat Reader. SLAC Current Organizational Unit File Plans / Records Control Schedules For assistance in applying or developing a records schedule for your unit, please contact either the SLAC Archives and History Office (x3091 -- directorate and research records) or the SLAC Records Manager (x4342 -- business and safety records). Directorate Organizational Unit Applicable File Plans(s) / Records Control Schedule(s) Director's Office SLAC DO Schedule Advisor for Science and Technology DOE Administrative Records schedules and DOE R&D Schedule Chief Research Officer DOE Administrative Records schedules and DOE R&D Schedule Communications Office DOE Administrative Records schedules (particularly ADM14 and ADM21)

56

Green Scheduling: Scheduling of Control Systems for Peak Power Reduction  

E-Print Network [OSTI]

approach to fine-grained coordination of energy demand by scheduling energy consuming control systems of the system variables only, control system execution (i.e. when energy is supplied to the system-Scheduling; Energy Systems; Peak Power Reduction; Load Balancing; I. INTRODUCTION During a major sporting event

Pappas, George J.

57

DOERS Records Schedule Cross Index to DOE Administrative Records...  

Office of Environmental Management (EM)

DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules...

58

QAMF-002_ACourse Registry/Review Schedule Intitial Release D  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2_ACourse Registry/Review Schedule 2_ACourse Registry/Review Schedule Intitial Release D E A B C Revision History: Rev. Description of Change [N/A Referenced Documents: Parent Document: QAMF-002 Rev. A Approvers: Melissa Otero Document Owner: Elizabeth Sousa Backup Owner: Notify of Changes: EOTA - Business Form Document Title: QAMP-002 Project/Course Maintenance Process Document Number: Course Registry/Review Schedule EOTA Employees Melissa Otero QAMF-002_ACourse Registry/Review Schedule CIP100D Introduction to Analytical Risk Management CIP101DW DOE/NNSA Asset Overview (formerly RAP-165DW) CIP110DW Vehicle Bomb Search Methods CIP300DC Weapons of Mass Destruction (WMD): Training CIP400DC Weapons of Mass Destruction (WMD): Training Exercises CMP101DW Operations Overview of Consequence Management CMP104DW Health and Safety Orientation

59

_PART I - THE SCHEDULE  

National Nuclear Security Administration (NNSA)

15 dated 9/9/13 Contract No. DE-AC04-94AL85000 15 dated 9/9/13 Contract No. DE-AC04-94AL85000 Modification No. M202 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ...................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, A0514) ............................................................................................................................ 4 B-3 AVAILABILITY OF APPROPRIATED FUNDS ................................................................. 8 B-9999 AMERICAN RECOVERY AND REINVESTMENT ACT WORK VALUES (Added M331; Modified: A335, A336, A340, A341, A342, A346, A347, A348, A349, A350,

60

Structure Breakdown Workshop Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Breakdown Breakdown Workshop SLAC, Orange Room August 28 - 30 , 2000 Announcement Workshop Poster Workshop Goals: The Goal of the workshop is to review understanding of warm structure breakdown phenomena, to define common terms for comparing tests and to identify avenues for further study. For a partial bibliography, please view the following URL : http://www-project.slac.stanford.edu/lc/wkshp/RFBreakdwn/references/publist.htm Schedule and Presentations: Monday, August 28 8:30 - Operation Experience and Definition of Problem Moderator - G. Loew (initial questions) Opening remarks and introduction (C. Adolphsen) (15min) CERN Structure Operation Results (W. Wuensch) (30 min) NLCTA Structure Operation Results (C. Adolphsen) (30 min) ASTA Structure Operation Results (R. Loewen) (20 min)

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Speaker Host Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Science Seminar User Science Seminar Previous Speakers User Science Seminar Host Schedule User seminar is hosted by a different XSD group leader every two weeks. If you have any suggestions for possible speakers for the following dates, please contact the appropiate group leader below. Month Host 2012 October 5 & 12, 2012 Peter Chupas October 19 & 26,2012 Jon Almer November 2 & 9,2012 Francesco Decarlo November 16, 2012 Stefan Vogt November 23, 2012 Cancelled - Thanksgiving Holiday December 7, 2012 Stefan Vogt December 14 & 21, 2012 Randy Winans December 28, 2012 Cancelled - Xmas Holiday 2013 Janurary 4-25, 2013 Cancelled - January Shutdown February 1 & 8 , 2013 Lahsen Assoufid February 15 & 22, 2013 Thomas Gog March 1 & 8, 2013 Jonathan Lang

62

schedule_2006.xls  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 Long Range Operations Schedule 6 Long Range Operations Schedule (October 2005 - September 2006) 1 1 1 1 → 1 1 1 4 → 1 1 1 1 1 1 2 2 4 → 2 1 → 2 2 2 4 2 2 2 2 2 1 → 2 3 3 4 3 1 → 3 3 3 4 3 3 3 3 3 1 → 3 4 4 4 4 1 → 4 4 4 4 4 4 4 4 4 1 → 4 5 5 4 5 1 → 5 5 5 4 5 5 5 5 5 1 → 5 6 6 4 6 1 6 6 6 4 6 6 6 6 6 1 → 6 7 7 4 7 1 → 7 7 7 4 7 7 7 7 7 1 → 7 8 8 4 8 1 → 8 8 8 4 → 8 8 8 8 8 1 8 9 9 9 1 → 9 9 9 4 9 9 9 9 9 1 → 9 10 10 10 1 → 10 10 10 4 10 10 10 10 10 1 → 10 11 11 11 1 → 11 11 11 4 11 11 11 11 11 1 → 11 12 12 12 1 → 12 12 12 4 12 1 → 12 12 12 4 → 12 1 → 12 13 13 13 1 13 13 13 4 13 1 → 13 13 13 4 13 1 → 13 14 14 14 5 → 14 14 14 14 1 → 14 14 14 4 14 1 → 14 15 15 15 5 15 15 15 15 1 → 15 15 15 4 15 1 15 16 16 16 5 16 16 16 16 1

63

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

64

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

65

Scheduling algorithms for arbitrary communication networks  

E-Print Network [OSTI]

We consider the problem of designing scheduling schemes for networks with arbitrary topology and scheduling constraints. We address the optimality of scheduling schemes for packet networks in terms of throughput, delay and ...

Jagabathula, Srikanth

2008-01-01T23:59:59.000Z

66

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Broader source: Energy.gov (indexed) [DOE]

9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons...

67

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy Savers [EERE]

9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the...

68

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

69

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in...

70

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

71

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

0: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

72

LCLS Operating Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

73

Wholesale Power Rate Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

74

International Journal of Parallel Programming submission February 3, 1997 Analyzing Asynchronous Pipeline Schedules  

E-Print Network [OSTI]

Pipeline Schedules Val Donaldson and Jeanne Ferrante Computer Science and Engineering Department University pipelining is a form of parallelism which may be used in distributed memory systems. An asynchronous pipeline of a pipeline schedule is needed to determine if pipelining is appropriate for a loop, and to compare

Ferrante, Jeanne

75

EIA Records Schedule 0011.doc  

Broader source: Energy.gov (indexed) [DOE]

RECORD SCHEDULE N1-434-94-001 RECORD SCHEDULE N1-434-94-001 EIA Records Schedule N1-434-94-001 Approved by NARA April 3, 1995 (Some surveys are no longer in use. Read notes at bottom of last page) ITEM NO. DESCRIPTION OF RECORDS AUTHORIZED DISPOSITION Item 1) COAL DISTRIBUTION DATA, 1980-1988. This file contains data on the distribution of U.S. coal by coal-producing district of origin, consumer end-use category, state of destination and method of transportation; also included is export shipment information. This is a closed series. Disposition: PERMANENT. Transfer a copy of the data files and documentation to the National Archives upon approval of this schedule by the Archivist of the United States Item 2) HISTORICAL PLANT COST AND ANNUAL PRODUCTION EXPENSE DATA, 1979-1991.

76

On parallel machine scheduling 1  

E-Print Network [OSTI]

On parallel machine scheduling 1 machines with setup times. The setup has to be performed by a single server. The objective is to minimize even for the case of two identical parallel machines. This paper presents a pseudopolynomial

Magdeburg, Universität

77

Task merging for better scheduling  

Science Journals Connector (OSTI)

This paper proposes a new algorithm to restructure task graphs for suitable scheduling. The algorithm reduces communication costs by merging those tasks within a task graph whose communication costs exceeds their execution time. Task duplication techniques ...

Saeed Parsa; Neda Reza Soltani; Saeed Shariati

2009-08-01T23:59:59.000Z

78

Delay tails in MapReduce scheduling  

Science Journals Connector (OSTI)

MapReduce/Hadoop production clusters exhibit heavy-tailed characteristics for job processing times. These phenomena are resultant of the workload features and the adopted scheduling algorithms. Analytically understanding the delays under different schedulers ... Keywords: MapReduce, coupling scheduler, fair scheduler, first in first out, hadoop, heavy-tails, processor sharing

Jian Tan; Xiaoqiao Meng; Li Zhang

2012-06-01T23:59:59.000Z

79

Provably Efficient Two-Level Adaptive Scheduling  

E-Print Network [OSTI]

processor reallocation, our schedulers provide control over the scheduling overhead and ensure effectiveProvably Efficient Two-Level Adaptive Scheduling Yuxiong He1 , Wen-Jing Hsu1 , and Charles E. Multiprocessor scheduling in a shared multiprogramming en- vironment can be structured in two levels, where

Feitelson, Dror

80

Wireless Link Scheduling under Physical Interference Model  

E-Print Network [OSTI]

approximation algorithms for link scheduling with or without power control. Index Terms--Link schedulingWireless Link Scheduling under Physical Interference Model Peng-Jun Wan, Ophir Frieder, Xiaohua Jia: jia@cs.cityu.edu.hk, csfyao@cityu.edu.hk Abstract--Link scheduling is a fundamental problem in multi

Jia, Xiaohua

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Bringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling Assistants  

E-Print Network [OSTI]

of scheduling, or they demand too much control of an important aspect of the individual's working world. PTIMEBringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling This position paper discusses the scheduling problem as collaboration between human and automated scheduling

Yorke-Smith, Neil

82

EIA-423 and Schedule 2 of EIA-923  

Gasoline and Diesel Fuel Update (EIA)

Historic Form EIA-423 & FERC-423 Detailed Data Historic Form EIA-423 & FERC-423 Detailed Data Beginning in 2008, data on monthly deliveries of fossil fuels to both utility and nonutility generating facilities are collected on Schedule 2 of the newer Form EIA-923 -- See EIA-923 detailed data Schedule 2. Survey form EIA-423 collected monthly nonutility fuel receipts and fuel quality files on plants with a fossil-fueled nameplate generating capacity of 50 or more megawatts. Detailed data are provided here on monthly deliveries of fossil fuels to nonutility generating facilities are included at the specific energy source, quantity of fuel delivered, the Btu content, sulfur content, ash content, coal mine state and county (or country) of origin, coal mine type (surface/underground), as well as the supplier of the fuel. Fuel cost data collected on this survey is not be made available to the public because it is protected.

83

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

84

Microsoft Word - DOE Records Disposition Schedule Changes3.doc  

Broader source: Energy.gov (indexed) [DOE]

6 6 Changes-to-Schedules REV 3 DOE Administrative Records Schedules Changes Last revised: 12/14/2009 Date DOE Admin Schedule Item(s) Change Authorizing Document 3/02/07 1 10b, 24, 27, 42a-c Added items for Form I-9 (GRS 1, Item 10b), reasonable accommodation records (GRS 1, Item 24), alternative dispute resolution records (GRS 1, item 27), and alternative worksite records (GRS 1, Item 42). Added item numbers for N1 citations. GRS Transmittal No. 11, 12/31/03; GRS Transmittal No. 12, 7/14/04; GRS 1 Item 42 6/14/07 1 11 Second sentence in NOTE deleted. 6/14/07 1 12 Moved the NOTE for 12a to the series title. GRS 1, item 12 6/14/07 1 21 Inserted the "see note" and the disposition authority for the series title. N1-343-98-4, item 21 and GRS

85

Argonne National Lab Cleanup schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Takes Steps to Complete Clean-Up of Argonne by 2003; Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule, shipments to DOE's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, are expected to begin in Spring 2001 and be completed by the end of the calendar year. Characterization of the waste currently stored at Argonne will begin this October. This agreement is a major step in honoring Argonne and DOE's commitment to the community to

86

NSLS-II Project Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NSLS-II Project Schedule NSLS-II Project Schedule Major Milestone Event Major Milestone Event Preliminary Schedule CD-0 (approve Mission Need) 4th quarter, FY2005 CD-1 (approve Alternative Selection and Cost Range) 4th quarter, FY2007 CD-2 (approve Performance Baseline) 1st quarter, FY2008 CD-3 (approve Start of Construction) 2nd quarter, FY2009 CD-4 (approve Start of Operations) FY2015 Critical Decisions The five Critical Decisions are major milestones approved by the Secretarial Acquisition Executive or Acquisition Executive that establish the mission need, recommended alternative, Acquisition Strategy, the Performance Baseline, and other essential elements required to ensure that the project meets applicable mission, design, security, and safety requirements. Each Critical Decision marks an increase in commitment of

87

Technical Qualification Program Accreditation Schedule  

Broader source: Energy.gov (indexed) [DOE]

Qualification Program (TQP) Accreditation Schedule Qualification Program (TQP) Accreditation Schedule (Note 1) Year 2013 2014 Month Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P Site/Office EM Sites/Offices Y Carlsbad Field Office ? Consolidated Business Center Y Office of River Protection (Note 3) ? Office of Site Support and Small Projects N Portsmouth/Paducah Project Office Y Richland Operations Office (Note 3) Y Savannah River Operations Office N Office of Environmental Management SC Sites/Offices

88

Multi-agent Cluster Scheduling for Scalability and Flexibility  

E-Print Network [OSTI]

of clusters scheduling and classical concurrency controlotherwise push control of task scheduling and execution towhich actively controls and modifies scheduling domains as

Konwinski, Andrew David

2012-01-01T23:59:59.000Z

89

Adaptive Scheduling in Ad Hoc and Cellular Wireless Networks  

E-Print Network [OSTI]

2004. 3 Joint Scheduling and Power Control for Multicastingusers. This joint scheduling and power control problem is38 Joint Scheduling and Power Control for Multicasting in

Tan, Choo Chin

2013-01-01T23:59:59.000Z

90

A Hybrid Bin-Packing Heuristic to Multiprocessor Scheduling  

E-Print Network [OSTI]

Abstract. The multiprocessor scheduling problem consists in schedul- ...... parallel machine scheduling", Production Planning and Control 9 (1998), 685{689. 9.

91

Pump-1-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-A Wholesale Power Rate Schedule Pump-1-A Wholesale Power Rate Schedule Area: Carters & Russell Pumping System: Georgia-Alabama-South Carolina This rate schedule shall be...

92

Audit/Investigative Records Schedule (Revision 2) | Department...  

Office of Environmental Management (EM)

Investigative Records Schedule (Revision 2) AuditInvestigative Records Schedule (Revision 2) This schedule covers records associated with investigations other than those performed...

93

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of...  

Office of Environmental Management (EM)

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records...

94

Theory Seminar Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-2002 1-2002 30 July 2002 Josef Speth -- Forschungszentrum Juelich j.speth@fz-juelich.de From Nuclear Physics to the Stock Market 23 May 2002 Peter Cabauy -- University of Michigan and Argonne National Lab cabauy@phy.anl.gov Quantum Computing and Cyclic Networks of Quantum Gates 15 May 2002 Andreas Nogga -- University of Arizona anogga@physics.arizona.edu Bound states of the 4N and 3N-hyperon systems 30 April 2002 Prashanth Jaikumar -- SUNY, Stony Brook jaikumar@tonic.physics.sunysb.edu Aspects of High Density QCD and Neutron Star Cooling 4 April 2002 Charles J. Horowitz -- Indiana University at Bloomington charlie@niobe.iucf.indiana.edu Parity Violating Measurements of Neutron Densities: Implications for Neutron Stars 26 March 2002 Andreas Krassnigg -- Institut fuer Theoretische Physik, Karl-Franzens-Universitaet Graz, Austria andreas.krassnigg@kfunigraz.ac.at A Relativistic Point-Form Approach to Quark-Antiquark Systems

95

SCHEDULE OF FEES Wet Milling  

E-Print Network [OSTI]

SCHEDULE OF FEES Wet Milling 100 g.......................$120..per sample* 1 kilogram of Illinois offers five milling procedures to determine processing characteristics of corn. Laboratory times. WET MILLING The wet milling process is used to produce starch (99.6% purity) as the primary

Illinois at Urbana-Champaign, University of

96

Optimization of Injection Scheduling in  

E-Print Network [OSTI]

SGP-TR-I12 Optimization of Injection Scheduling in Geothermal Fields James Lovekin May 1987&injection optimization problem is broke$ into two subpmbkm:(1) choosing a configuration of injectorsfrom an existing set is defined as the fieldwide break- through lindex, B. Injection is optimized by choosing injection wells

Stanford University

97

Scheduling & Resources - Power Marketing - Sierra Nevada Region...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Marketing > Scheduling & Resources Scheduling & Resources - Greenbook 2004 (PDF - 1.04MB) - CVP Gross Power (XLS - 5.25MB) - CVP BaseResource (XLS - 2.02MB) - WY2002 Analysis (XLS...

98

Human aspects of scheduling : a case study  

E-Print Network [OSTI]

This work presents a look at real-life production-floor scheduling, comparing and contrasting it to both normative OR theory and Cognitive Psychology theory. Relevant literature in OR, scheduling and psychology is reviewed, ...

Boasson, Yishai, 1973-

2006-01-01T23:59:59.000Z

99

Medical Exam Scheduling - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

100

Multi-Year Schedule | Department of Energy  

Energy Savers [EERE]

DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. multiyearscheduleaug2011.pdf More Documents & Publications 9th...

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Office of Environmental Management (EM)

CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL,...

102

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

103

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records...

104

Move Frame Scheduling and Mixed SchedulingAllocation for the Automated Synthesis of Digital Systems y  

E-Print Network [OSTI]

steps: 1) Data path synthe­ sis (operation scheduling and hardware allocation), and 2) Control path design. In the scheduling phase, operations are assigned to the appropriate control steps. The allocaMove Frame Scheduling and Mixed Scheduling­Allocation for the Automated Synthesis of Digital

Nourani, Mehrdad

105

DYNAMIC SCHEDULING M. C. H. Wright  

E-Print Network [OSTI]

for a time interval after which control is returned to the scheduling program to determine the best project who wants more time to evaluate their data can return control to the scheduling program, and come backDYNAMIC SCHEDULING M. C. H. Wright Radio Astronomy Laboratory, University of California, Berkeley

Militzer, Burkhard

106

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network [OSTI]

, providing much greater scheduling flexibil­ ity. Modular, hierarchical control can be provided over systems control the sharing of the machine's CPU resources among threads using a fixed scheduling schemeCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah

Ford, Bryan

107

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network [OSTI]

, providing much greater scheduling flexibil- ity. Modular, hierarchical control can be provided overCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah processor scheduling mechanisms in operat- ing systems are fairly rigid, often supportingonly one fixed

Ford, Bryan

108

Models for Train Scheduling Krishna C. Jha  

E-Print Network [OSTI]

Models for Train Scheduling Krishna C. Jha Vice President - Research & Development krishna/analytics, and packaging into web-based map-based interfaces. Innovative Scheduling Overview #12;-3- The train schedule is one of most critical components in the passenger or freight transportations. The quality of a train

Bustamante, Fabián E.

109

Batch Scheduling with Deadlines on Parallel Machines  

E-Print Network [OSTI]

Batch Scheduling with Deadlines on Parallel Machines Peter Brucker Mikhail Y. Kovalyov, Yakov M of scheduling G groups of jobs on m parallel machines is considered. Each group consists of several identical) and to schedule the batches on the machines. It is possible for different batches of the same group

Magdeburg, Universität

110

Flow shop scheduling with peak power consumption constraints  

E-Print Network [OSTI]

Mar 29, 2012 ... Flow shop scheduling with peak power consumption constraints ... Keywords: scheduling, flow shop, energy, peak power consumption, integer ...

K. Fang

2012-03-29T23:59:59.000Z

111

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

112

Microsoft Word - Changes-to-Schedules _Recovered_  

Broader source: Energy.gov (indexed) [DOE]

Changes-to-Schedules Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to "Reserved" (Schedules ,4,5, and 14.) GRS Transmittal Number 22 9/15/2010 1 23.b.(3) Deleted citation, 5 CFR 214. GRS Transmittal Number 22 1 25.a. Text deleted "and as described in 29 CFR 1614." GRS Transmittal Number 22

113

This Week In Petroleum Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

This Week In Petroleum Schedule This Week In Petroleum Schedule Holiday Release Schedule for the This Week In Petroleum The standard release time and day of the week will be after 1:00 p. m. (Eastern time) on Wednesdays with the following exceptions. Data for the week ending Alternate Release Date Release Day Release Time Holiday November 8, 2013 November 14, 2013 Thursday after 1:00 p.m. Veterans December 20, 2013 December 27, 2013 Friday after 1:00 p.m. Christmas December 27, 2013 January 3, 2014 Friday after 1:00 p.m. New Year's January 17, 2014 January 23, 2014 Thursday after 1:00 p.m. Martin Luther King Jr. February 14, 2014 February 20, 2014 Thursday after 1:00 p.m. President's May 23, 2014 May 29, 2014 Thursday after 1:00 p.m. Memorial August 29, 2014 September 4, 2014 Thursday after 1:00 p.m. Labor

114

1998 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03, 13:00 Tue, Feb 10, 18:00-Thu, Feb 12, 02:00 32 hrs Tue, Feb 17, 17:00 Wed, Feb 18, 17:00 Mon, Feb 23, 06:00-Wed, Feb 25, 02:00 44 hrs Mon, Mar 02, 17:00 Tue, Mar 03, 13:00 Mon, Mar 09, 18:00-Wed, Mar 11, 02:00 32 hrs Mon, Mar 16, 17:00 Tue, Mar 17, 13:00 Mon, Mar 23, 06:00-Wed, Mar 25, 02:00 44 hrs

115

1997 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 13:00 Tue, Feb 11, 18:00-Thu, Feb 13, 02:00 32 hrs Mon, Feb 18, 09:30 Tue, Feb 18, 13:00 Mon, Feb 24, 06:00-Wed, Feb 26, 02:00 44 hrs Mon, Mar 03, 17:00 Tue, Mar 04, 13:00 Mon, Mar 10, 18:00-Wed, Mar 12, 02:00 32 hrs Mon, Mar 17, 17:00 Tue, Mar 18, 13:00 Mon, Mar 24, 06:00-Wed, Mar 26, 02:00 44 hrs

116

2000 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15, 17:00 Tue, Feb 22, 06:00-Thu, Feb 24, 02:00 44 hrs Mon, Feb 28, 17:00 Tue, Feb 29, 13:00 Mon, Mar 06, 18:00-Wed, Mar 08, 02:00 32 hrs Mon, Mar 13, 17:00 Tue, Mar 14, 13:00 Mon, Mar 20, 06:00-Wed, Mar 22, 02:00 44 hrs Mon, Apr 10, 17:00 Tue, Apr 11, 13:00 Mon, Apr 17, 06:00-Wed, Apr 19, 02:00 44 hrs

117

2002 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue, Jan 29, 17:00 Tue, Feb 05, 18:00-Thu, Feb 07, 02:00 32 hrs Mon, Feb 11, 17:00 Tue, Feb 12, 17:00 Tue, Feb 19, 06:00-Wed, Feb 20, 02:00 20 hrs Mon, Feb 25, 17:00 Tue, Feb 26, 13:00 Mon, Mar 04, 18:00-Wed, Mar 06, 02:00 32 hrs Mon, Mar 11, 17:00 Tue, Mar 12, 13:00 Mon, Mar 18, 06:00-Wed, Mar 20, 02:00 44 hrs

118

1999 SSRL Accelerator Physics Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 SSRL Accelerator Physics Schedule 9 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb 22, 06:00-Wed, Feb 24, 02:00 44 hrs Mon, Mar 01, 17:00 Tue, Mar 02, 13:00 Mon, Mar 08, 18:00-Wed, Mar 10, 02:00 32 hrs Mon, Mar 15, 17:00 Tue, Mar 16, 13:00 Mon, Mar 22, 06:00-Wed, Mar 24, 02:00 44 hrs Mon, Apr 12, 17:00 Tue, Apr 13, 13:00 Mon, Apr 19, 06:00-Wed, Apr 21, 02:00 44 hrs

119

Compute Reservation Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Queue Look Queue Wait Times Hopper Queues and Policies Edison Queues and Policies Carver Queues and Policies Dirac Queues and Policies Compute Reservation Request Form Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » Queues and Scheduling » Compute Reservation Request Form Compute Reservation Request Form

120

Superplastic forming using NIKE3D  

SciTech Connect (OSTI)

The superplastic forming process requires careful control of strain rates in order to avoid strain localizations. A load scheduler was developed and implemented into the nonlinear finite element code NIKE3D to provide strain rate control during forming simulation and process schedule output. Often the sheets being formed in SPF are very thin such that less expensive membrane elements can be used as opposed to shell elements. A large strain membrane element was implemented into NIKE3D to assist in SPF process modeling.

Puso, M.

1996-12-04T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Smart charging and appliance scheduling approaches to demand side management  

Science Journals Connector (OSTI)

Abstract Various forms of demand side management (DSM) programs are being deployed by utility companies for load flattening amongst the residential power users. These programs are tailored to offer monetary incentives to electricity customers so that they voluntarily consume electricity in an efficient way. Thus, DSM presents households with numerous opportunities to lower their electricity bills. However, systems that combine the various DSM strategies with a view to maximizing energy management benefits have not received sufficient attention. This study therefore proposes an intelligent energy management framework that can be used to implement both energy storage and appliance scheduling schemes. By adopting appliance scheduling, customers can realize cost savings by appropriately scheduling their power consumption during the low peak hours. More savings could further be achieved through smart electricity storage. Power storage allows electricity consumers to purchase power during off-peak hours when electricity prices are low and satisfy their demands when prices are high by discharging the batteries. For optimal cost savings, the customers must constantly monitor the price fluctuations in order to determine when to switch between the utility grid and the electricity storage devices. However, with a high penetration of consumer owned storage devices, the charging of the batteries must be properly coordinated and appropriately scheduled to avoid creating new peaks. This paper therefore proposes an autonomous smart charging framework that ensures both the stability of the power grid and customer savings.

Christopher O. Adika; Lingfeng Wang

2014-01-01T23:59:59.000Z

122

Plans and Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance & Equipment Standards » About » Plans and Schedules Appliance & Equipment Standards » About » Plans and Schedules Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the program's semi-annual implementation report to Congress. The program will also issue other plans and schedules when needed. The most recent 5-year plan was released in October 2010 and outlines how the program planned to meet all the statutory requirements established in the Energy Policy and Conservation Act of 1975, as amended. Expedited Rulemakings In November 2010, the Department of Energy (DOE) adopted new procedures that enable certain rulemakings to be expedited or improve the efficiency of the rulemaking process:

123

Definition: Net Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule Interchange Schedule Jump to: navigation, search Dictionary.png Net Interchange Schedule The algebraic sum of all Interchange Schedules with each Adjacent Balancing Authority.[1] Related Terms Balancing Authority, Adjacent Balancing Authority, Interchange, Interchange Schedule, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Net_Interchange_Schedule&oldid=502531" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

124

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

125

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

126

APS Long Range Operations Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

127

HHS SMALL BUSINESS REVIEW FORM  

Broader source: Energy.gov (indexed) [DOE]

DOE Form 4220.2 (Revised March 14 2013) DOE Form 4220.2 (Revised March 14 2013) Office of Small and Disadvantaged Business Utilization DOE F 4220.2 - Small Business Review Form (03/14/2013) OSDBU Control Number: _______________________________________Date Received: ______________________________ A. Project Information 1. Requisition Number: ________________________ Acquisition Instrument Proposed/Contract Type: [ ] Contract No (Mod): ______________________ [ ] Departmental IDIQ No: ___________________ [ ] GSA Schedule: _________________________ [ ] GWAC Contract: ________________________ [ ] DOE BPA:_____________________________ 2. Acquisition Office and Program Element: CO/CS Name: Contact Information (Telephone and E-mail): 3. Description of services or supplies:

128

Scheduling of a parallel workload: Implementation and use of the argonne easy scheduler at PDC  

Science Journals Connector (OSTI)

Scheduling of a workload of parallel jobs on a large parallel computer puts specific demands on a scheduling system. Especially if the objective is to give a good service for the largest parallel jobs. In this pa...

Lars Malinowsky; Per Öster

1998-01-01T23:59:59.000Z

129

Robustness in Combinatorial Optimization and Scheduling Theory ...  

E-Print Network [OSTI]

ten years in the area of combinatorial optimization and scheduling theory .... with robust reformulation of optimization model by adapting robust control ...

2006-09-26T23:59:59.000Z

130

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 17, 2014 ... The resulting problem is a non-linear scheduling problem with .... Once the grade control plan is constructed we need to solve the utilization ...

2014-11-24T23:59:59.000Z

131

EM Quality Assurance Assessment Schedule FY 2010  

Broader source: Energy.gov [DOE]

Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the remainder of fiscal year (FY) 2010.

132

Rate Schedule PACI-T3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to support the transmission...

133

Proposal Submittal and Scheduling Procedures Entry Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Submittal and Scheduling Procedures for Research at SSRL X-rayVUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy...

134

Machine scheduling using the Bees algorithm.  

E-Print Network [OSTI]

??Single-machine scheduling is the process of assigning a group of jobs to a machine. The jobs are arranged so that a performance measure, such as… (more)

Phrueksanant, Janyarat

2013-01-01T23:59:59.000Z

135

Construction project scheduling problem with uncertain resource ...  

E-Print Network [OSTI]

... on-going activities. 7 Conclusions and future work .... constrained construction scheduling, Journal of Computing in Civil Engineering, 13(3),. 207-216. [23] Liu ...

2004-06-01T23:59:59.000Z

136

Work Schedules | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

job performance, improve morale and help reduce work-related stress, as well as reduce air pollution and traffic congestion. Participation in either the alternate work schedule...

137

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and...

138

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Broader source: Energy.gov (indexed) [DOE]

activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records...

139

Renewable Fuel Standard Schedule | Open Energy Information  

Open Energy Info (EERE)

Standard Schedule Standard Schedule Jump to: navigation, search Name Renewable Fuel Standard Schedule Sector Liquid Transportation Fuels Spatial Resolution National Geographic Scope United States Temporal Resolution Annual The United States Environmental Protection Agency, under the National Renewable Fuel Standard program and as required by the Energy Independence and Security Act of 2007 (EISA), periodically revises the volumetric standards for cellulosic biofuel, biomass-based diesel, advanced biofuel, and total renewable fuel that must be used in transportation fuel each year. The table below lists the current RFS2 schedule in billions of gallons: Year Renewable Biofuel Advanced Biofuel Cellulosic Biofuel Biomass-based Diesel Undifferentiated Total 2008 9 9

140

Publication Submission Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pages Pages publicationsubmission Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES LCLS : Linac Coherent Light Source An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar LCLS Lasers Expand Lasers LCLS Quick Launch Home About LCLS Expand About LCLS LCLS News Expand LCLS News User Resources Expand User Resources Instruments Expand Instruments Proposals Publications Expand Publications Schedules Machine Status Machine FAQs Safety Organization Expand Organization Directories Expand Directories Staff Resources Contact Us All Site Content Department of Energy Page Content Publication Submission Form Th Tell LCLS about new publications Please submit this form to notify LCLS about new publications relating to

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

APS Long Range Schedule 2000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APS FY2000 Beamline Operations Schedule APS FY2000 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 10 11 12 13 14 15 16 0000-0800 SM SM SM SM SM MS MS 0800 - 1600 SM SM SM SM MS MS MS 1600 - 2400 SM SM SM SM MS MS MS Week 2 17 18 19 20 21 22 23 0000 - 0800 MS MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 3 24 25 26 27 28 29 30 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO JAN/FEB 31 1 2 3 4 5 6 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 5 7 8 9 10 11 12 13 0000 - 0800 UO UO UO UO UO UO UO

142

Environmental surveillance master sampling schedule  

SciTech Connect (OSTI)

This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

Bisping, L.E.

1994-02-01T23:59:59.000Z

143

Schedule optimization study implementation plan  

SciTech Connect (OSTI)

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

144

Genetic-based scheduling to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

The parcel hub scheduling problem (PHSP) is scheduling problem that is common in the parcel delivery industry. The PHSP consists of scheduling a set of inbound trailers containing a batch of heterogeneous parcels to a set of unload docks with the objective ... Keywords: Distribution, Genetic algorithm, Parcel, Sortation, Work load balancing

Douglas L. McWilliams

2009-05-01T23:59:59.000Z

145

An Optimal General Purpose Scheduler for Networked Control Systems  

E-Print Network [OSTI]

An Optimal General Purpose Scheduler for Networked Control Systems Ahmed Elmahdi , Ahmad F Taha to control the time delay is to im- prove the scheduling criterion. This paper proposes an optimal scheduling the stability of the control system. The proposed optimal schedul- ing protocol is a hybrid scheduling criterion

Sun, Dengfeng

146

Earth Forms.  

E-Print Network [OSTI]

??Earth Forms narrates and explains the Masters Project Exhibition by the same name. The sculptures included in the exhibition, Earth Forms, use a variety of… (more)

Mock, Janelle Marie Tullis

2010-01-01T23:59:59.000Z

147

Retail Store Scheduling for Profit Nicolas Chapadosa  

E-Print Network [OSTI]

Retail Store Scheduling for Profit Nicolas Chapadosa , Marc Joliveaub , Pierre L'Ecuyera , Louis for retail stores has received relatively scant attention. Current approaches typically attempt to minimize the retail scheduling problem in terms of operating profit maximization, explicitly recognizing the dual role

L'Ecuyer, Pierre

148

Online Deadline Scheduling with Bounded Energy Efficiency  

E-Print Network [OSTI]

Online Deadline Scheduling with Bounded Energy Efficiency Joseph Wun-Tat Chan1 , Tak-Wah Lam 2 concern when compared to throughput and the schedules targeted may be very poor in energy efficiency subject to a user-defined threshold of energy efficiency. We first show that all deterministic online

Wong, Prudence W.H.

149

PROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE  

E-Print Network [OSTI]

] project scheduling inevitably involves uncertainty. The basic inputs (i.e., time, cost, and resourcesPROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE UNCERTAINTY USINC BAYESIAN NETWORKS VAHID, there is a causal relationship between these uncertainty sources and project parameters; this causality

Neil, Martin

150

Modeling realistic hybrid flexible flowshop scheduling problems  

Science Journals Connector (OSTI)

This paper aims to contribute to the recent research efforts to bridge the gap between the theory and the practice of scheduling by modelizing a realistic manufacturing environment and analyzing the effect of the inclusion of several characteristics ... Keywords: Hybrid flexible flowshop, Precedence constraints, Realistic scheduling, Sequence-dependent setup times

Rubén Ruiz; Funda Sivrikaya ?erifo?lu; Thijs Urlings

2008-04-01T23:59:59.000Z

151

Electrical Engineering Technology (EET) LONG RANGE SCHEDULE  

E-Print Network [OSTI]

and Machinery C T C T EET 365W Electrical Power & Machinery Laboratory C C, V V C C, V V EET 370T Energy=Virtual Laboratory, W=Web based This schedule is tentative. All Course offerings are subject to minimum enrollmentElectrical Engineering Technology (EET) LONG RANGE SCHEDULE Course Number and Name Fall 2010 Spr

152

Operations scheduling in job-shops  

E-Print Network [OSTI]

This thesis is in the area of operations scheduling in an automated or semi-automated job-shop system, where parts with various routings contend for service on the resources in the system. The classical job-shop scheduling problem has usually been...

Srinivasan, Anand

2012-06-07T23:59:59.000Z

153

45329 SCHEDULING POSTER.ai  

Broader source: Energy.gov (indexed) [DOE]

These courses have immediate open registraton These courses have immediate open registraton PLEASE LOOK FOR US AT http://energy.gov/dvu/professional-skills-and-technical-training OFFICE OF LEARNING & WORKFORCE DEVELOPMENT Professional Skills & Technical Training Program FY 2014 Corporate Schedule Points of Contact: If you have any logistical/registration questions please contact: Shira Kimble at 202-586-8449 or 301-903-5116. Course Title: Course Date: Time: CHRIS Code: Session: Location: Trustworthy Customer Services NEW January 15-16, 2014 8:30am-4:00pm 002452 0001 Forrestal RM GH- 043 CSRS Retirement Seminar January 28-30, 2014 8:30am-4:00pm 000033 0091 Forrestal RM GH- 043 Managing Up Down & Across February 11-12, 2014

154

SLAC - KEK: ISG8 Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agenda Agenda ISG8 Home Page Working Groups: WG1: Parameters, Design, Instrumentation and Tuning, Bldg.212 Cascades Conference Rm. WG2: Damping Rings and ATF, Bldg.214 Fuji Conference Rm WG3: RF Sources, Orange Rm (half) WG4:Structures, Orange Rm (half) WG5: Ground Motion; Site Requirements and Investigations, Bldg.281 Conventional Facilities Rm. Monday: 09:00 Plenary Sessions (Auditorium) Welcome - J. Dorfan Views from KEK - K. Takata TRC News - G. Loew Goals for ISG-8 - D. Burke / N. Toge Working Group Plans (5 min ea) - WG Conveners 11:00 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Tuesday: 09:00 Daily Schedule Update (Orange Rm) - WG Conveners (5min ea) 09:30 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Wednesday:

155

Inspection/Sampling Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

156

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect (OSTI)

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

157

EIA RECORDS SCHEDULE (EIARS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) The establishment of the Energy Information Administration (EIA) as an independent statistical agency within the U.S. Department of Energy in 1977 was a result of enabling legislation that charged the EIA to maintain a comprehensive data and information program relevant to energy resources and reserves, energy production, energy demand, energy technologies, and related financial and statistical information relevant to the adequacy of energy resources to meet the Nations demands in the near and longer term future EIA RECORDS SCHEDULE (EIARS) More Documents & Publications Request For Records Disposition ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS

158

Administrative Records Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER 1 Personnel Records (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records (pdf) 09/15/10 N1-434-98-5 3 Procurement, Supply, and Grant Records (pdf) 09/15/10 N1-434-98-6 N1-434-95-1 4 Property Disposal Records (pdf) 12/10/10 --- 5 Budget Preparation, Presentation and Apportionment Records (pdf) 12/10/10 N1-434-98-8 6 Accountable Officers' Accounts Records (pdf) 09/15/10 N1-434-98-9 7 Expenditure Accounting Records --- GRS 7 8 Stores, Plants and Cost Accounting Records --- GRS 8

159

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments  

E-Print Network [OSTI]

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments Nicanor into decentralized and networked dynamic resource allocation, scheduling, and control. 2 Questions 1. What, "Experiments for decentralized and networked dynamic resource allocation, scheduling, and control," Submitted

160

Enhancing feedback process scheduling via a predictive control approach  

E-Print Network [OSTI]

Enhancing feedback process scheduling via a predictive control approach Alessandro Vittorio the application possibilities at an affordable additional cost. Keywords: feedback scheduling; control that preemptive process schedulers in multitasking operating systems can be viewed, and above all designed

Como, Giacomo

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Energy Efficiency Exchange 2015 Schedule | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Schedule Energy Efficiency Exchange 2015 Schedule The schedule for Energy Efficiency Exchange 2015 is available below. Monday, August 10, 2015 12 p.m.-5:30 p.m. Registration...

162

CTV-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CTV-1-H Wholesale Power Rate Schedule CTV-1-H Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee...

163

CBR-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers...

164

Approximate resolution of a resource-constrained scheduling problem  

E-Print Network [OSTI]

hard resource-constrained scheduling problem which arises in relation to .... schedules in which the temperature is allowed to increase. 5 ...... Systems & Control.

165

A Mathematical approach applied to train scheduling in Brazilian ...  

E-Print Network [OSTI]

Abstract In this paper, a mathematical approach was used to schedule trains in ... Nowadays, due this criticality, the main decision about the train schedule over.

2014-07-15T23:59:59.000Z

166

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network [OSTI]

approach for the single machine scheduling problem. Journaldecisions on parallel CNC machines: -constraint approach.mechanism for the CNC machine scheduling problems with

Aktürk, M. Selim; Atamtürk, Alper; Gürel, Sinan

2010-01-01T23:59:59.000Z

167

CSI-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy Savers [EERE]

Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be...

168

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Broader source: Energy.gov (indexed) [DOE]

3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain...

169

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

170

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Office of Environmental Management (EM)

23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule covers those administrative management activities not covered by...

171

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES...  

Broader source: Energy.gov (indexed) [DOE]

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) This document lists the...

172

Rate Schedule CV-RFS4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

173

Definition: Scheduling Path | Open Energy Information  

Open Energy Info (EERE)

Scheduling Path Scheduling Path Jump to: navigation, search Dictionary.png Scheduling Path The Transmission Service arrangements reserved by the Purchasing-Selling Entity for a Transaction.[1] Related Terms transmission lines, Purchasing-Selling Entity, Transmission Service, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Scheduling_Path&oldid=480301" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

174

Definition: Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Schedule Schedule Jump to: navigation, search Dictionary.png Interchange Schedule An agreed-upon Interchange Transaction size (megawatts), start and end time, beginning and ending ramp times and rate, and type required for delivery and receipt of power and energy between the Source and Sink Balancing Authorities involved in the transaction.[1] Related Terms Interchange transaction References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interchange_Schedule&oldid=480572" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link

175

DOE HQ Shuttle Bus Route and Schedule  

Broader source: Energy.gov (indexed) [DOE]

Shuttle Bus Route and Schedule Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is

176

Undergraduate Program Time Limits and Work Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an associate's degree. Work schedules Year-round students Students participating in some special undergraduate programs, post-baccalaureate appointments, post-master's appointments, and GRA students working on a thesis or dissertation are excluded from the 30-hour per week work restriction.

177

Graduate Program Time Limits and Work Schedules  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's pursuing a second master's degree: 2 years With a master's pursuing a PhD: 4 years With a master's pursuing a master's and PhD in a new field: 6 years Students may remain in the GRA program for up to three months after receiving their PhD. Work schedules Year-round students Students participating in the MBA program, post-baccalaureate appointments,

178

APCF Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

179

Batch Queues and Scheduling Policies on Edison  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are...

180

Transportation resource scheduling in food retail industry  

E-Print Network [OSTI]

The objective of this thesis is to find an appropriate analytical method for scheduling the daily driver tasks in the grocery industry. The goal is to maximize driver utilization. A "Bin-packing" approach is employed to ...

Akkas, Arzum, 1978-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Production Scheduling with Energy Efficiency Constraints  

E-Print Network [OSTI]

This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and energy efficiency...

Lee, J.; Kozman, T. A.; Wang, X.

2007-01-01T23:59:59.000Z

182

DOE Announces New WIPP Tour Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at...

183

Provably Efficient Adaptive Scheduling for Parallel Jobs  

E-Print Network [OSTI]

Scheduling competing jobs on multiprocessors has always been an important issue for parallel and distributed systems. The challenge is to ensure global, system-wide efficiency while offering a level of fairness to user ...

He, Yuxiong

184

Scheduling of Mobile Robots with Preemptive Tasks  

Science Journals Connector (OSTI)

This paper deals with the problem of scheduling of mobile robots taking into account preemption cases in a ... capability of transporting materials between some machines, mobile robots are able to perform manufac...

Izabela Nielsen; Quang-Vinh Dang…

2014-01-01T23:59:59.000Z

185

Online optimization in routing and scheduling  

E-Print Network [OSTI]

In this thesis we study online optimization problems in routing and scheduling. An online problem is one where the problem instance is revealed incrementally. Decisions can (and sometimes must) be made before all information ...

Wagner, Michael R. (Michael Robert), 1978-

2006-01-01T23:59:59.000Z

186

WEBVIEWER INSTRUCTION PACKET Facilities Planning and Scheduling  

E-Print Network [OSTI]

-mail: scheduling@mail.wvu.edu Website: http://facilitiesscheduling.wvu.edu http://webviewer.wvu.edu #12;2 WebViewer: Detailed Instructions Table of Contents Purpose of WebViewer.................................................................................................................................3 Tour of Web

Mohaghegh, Shahab

187

Rate Schedule CV-EID4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EID4 EID4 (Supersedes Schedule CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Energy Imbalance (EI) service. Character and Conditions of Service: EI is provided when a difference occurs between the scheduled and the actual delivery of energy to a load within the Sub-Balancing Authority (SBA) over an hour or in accordance with approved policies and procedures. The deviation, in megawatts, is the net scheduled amount of

188

Project Schedule Optimization in a Telecommunications Environment  

E-Print Network [OSTI]

Veritas Corporation is a thriving company in the fast-paced telecommunications industry. To keep up with the dynamic industry, a significant quantity of projects must be scheduled in a short time period without impacting ...

Taliaferro, Chris

2013-12-20T23:59:59.000Z

189

EIA-412 Form and Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

12 (2003) |ANNUAL ELECTRIC INDUSTRY FINANCIAL REPORT |Form 12 (2003) |ANNUAL ELECTRIC INDUSTRY FINANCIAL REPORT |Form Approved OMB No. 1905-0129 Approval Expires 11/30/04 | | |GENERAL INFORMATION| |PURPOSE Form EIA-412 collects accounting, plant statistics, and transmission data from various electric industry entities in the United States. The data from this report appear in the following EIA publications: Financial Statistics of Major U.S. Publicly Owned Electric Utilities and Electric Power Annual. The data collected on this form are used to monitor the current status and trends of the electric power industry and to evaluate the future of the industry.| |REQUIRED RESPONDENTS The accounting data (Schedules 1 through 8) are to be completed by each municipality, political subdivision, State, and Federal entity engaged in the generation, transmission, or distribution of

190

Knowledge-Based Design of Scheduling Systems Jrgen Sauer  

E-Print Network [OSTI]

have to decide and control within the scheduling process. In different application areas scheduling1 Knowledge-Based Design of Scheduling Systems Jürgen Sauer Universität Oldenburg, FB Informatik Escherweg 2 D-26121 Oldenburg, Germany sauer@informatik.uni-oldenburg.de Abstract A Scheduling system shall

Appelrath, Hans-Jürgen

191

Survey of Gain-Scheduling Analysis & Design WE.Leithead  

E-Print Network [OSTI]

ranging from aerospace to process control. Despite the wide application of gain-scheduling controllers of gain-scheduling controllers and a diverse academic literature relating to gain- scheduling extendingSurvey of Gain-Scheduling Analysis & Design D.J.Leith WE.Leithead Department of Electronic

Duffy, Ken

192

A Reconfigurable, OnTheFly, ResourceAware, Streaming Pipeline Scheduler  

E-Print Network [OSTI]

A Reconfigurable, On­The­Fly, Resource­Aware, Streaming Pipeline Scheduler Michael K. Bradshaw, Jim to form a pipeline. While some advances have been made in automating this process, none yet exist that create pipelines that are fully aware of the system's resources. In this paper, we present the design

Massachusetts at Amherst, University of

193

Optimal Preemptive Semi-Online Scheduling to Minimize Makespan on Two Related Machines  

E-Print Network [OSTI]

Optimal Preemptive Semi-Online Scheduling to Minimize Makespan on Two Related Machines Leah Epstein uni- formly related machines. We analyze the algorithms as a function of the speed ratio (q #21; 1) between the two machines. We design algorithms of optimal competitive ratio for all values of q, and show

Epstein, Leah

194

Neuroscience Letters 384 (2005) 316320 Scheduling of sleep/darkness affects the circadian  

E-Print Network [OSTI]

; received in revised form 26 April 2005; accepted 29 April 2005 Abstract Shift work results adaptation to night shift work by facilitating appropriate phase shifts. In a simulated shift-work study, we that scheduled sleep/darkness can aid in adaptation to night shift work by inducing both advance and delay phase

195

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Send To: Video Scheduling  

E-Print Network [OSTI]

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Requestor: Send To: Video Scheduling Film and Video Collection Department University of Delaware Library (302) 831-8419 FAX (302) 831-6197 Media within seven days, please check out media at the Film and Video Collection Department Service Desk

Cakoni, Fioralba

196

Reducing Pausing at Rich-to-Lean Schedule Transitions: Effects of Variable-Ratio Schedules and Noncontingent Timeouts  

E-Print Network [OSTI]

-schedule component), which may maintain responding in the lean component when there is insufficient reinforcement. 4 General Introduction The Basic Problem: Pausing on FR Schedules Fixed-ratio (FR) schedules require that a certain number of responses occur.... In the context of a FR schedule, pausing may be considered counterproductive (or maladaptive) because it postpones the receipt of a reinforcer for a food-deprived organism. A host of variables affect pausing on FR schedules; for example, pausing increases as a...

Brewer, Adam Thornton

2012-08-31T23:59:59.000Z

197

Have you ever seen a project where the schedule performance index (SPI) and cost performance  

Broader source: Energy.gov (indexed) [DOE]

seen a project where the schedule performance index (SPI) and cost performance seen a project where the schedule performance index (SPI) and cost performance index (CPI) are both very good (both near 1.0), but the contingency and management reserve (MR) accounts are depleted? Have you ever heard someone confuse the terms management reserve (MR) and contingency? While we in the project and contract management community are familiar with these terms, we often see them used incorrectly and treated as if they were interchangeable during the execution of the work, creating confusion and potential improper accountability. While MR is a form of contingency, its application is managed and controlled by the contractor,

198

EEOC FORM  

National Nuclear Security Administration (NNSA)

U.S. Department of Energy U.S. Department of Energy National Nuclear Security Administration Management Directive-715 Fiscal Year 2012 DOE NNSA February 4, 2013 i National Nuclear Security Administration U.S. Department of Energy ANNUAL EEO PROGRAM STATUS REPORT EEO PLAN TO ATTAIN THE ESSENTIAL ELEMENTS OF A MODEL EEO PROGRAM Table of Contents Page FORM 715-01 Part A Department or Agency Identifying Information......................1 FORM 715-01 Part B Total Employment....................................................................1 FORM 715-01 Part C Agency Official(s) Responsible for oversight of EEO Program(s)................................................................................................................1

199

order form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Customer Order Form Customer Order Form Fermilab Education Office - Customer Order Form PO BOX 500, MS 777, Batavia, IL 60510 * ph. 630-840-8258 * fax 630-840-2500 * avarry@fnal.gov Date: This order be: SHIPPED PICKED UP? Bill to: Ship to: Contact/Institution name: Email: Phone: Fax: Payment method (please circle): Visa/MasterCard - Check - Purchase Order  Visa/MasterCard # P.O. # Exp Date: Quantity Ordered Item Name Item Description (color, size, etc.) Price Each Total Amount  For purchases over $200 only *IL residents ONLY: Add 7.5% sales tax to your order.

200

EIA-412 Form and Instructions  

U.S. Energy Information Administration (EIA) Indexed Site

12 (2003) 12 (2003) ANNUAL ELECTRIC INDUSTRY FINANCIAL REPORT Form Approved OMB No. 1905-0129 Approval Expires 11/30/04 GENERAL INFORMATION PURPOSE Form EIA-412 collects accounting, plant statistics, and transmission data from various electric industry entities in the United States. The data from this report appear in the following EIA publications: Financial Statistics of Major U.S. Publicly Owned Electric Utilities and Electric Power Annual. The data collected on this form are used to monitor the current status and trends of the electric power industry and to evaluate the future of the industry. REQUIRED RESPONDENTS The accounting data (Schedules 1 through 8) are to be completed by each municipality, political subdivision, State, and Federal entity engaged in the generation,

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Form Approved  

U.S. Energy Information Administration (EIA) Indexed Site

DISCLOSURE OF INFORMATION: The items RESPONDENT IDENTIFICATION Company Name and OTHER PARTY NAME (Item 1.A.), and SELLER'S NAME (Item 3.B.) on Form EIA-858 are DISCLOSURE OF INFORMATION: The items RESPONDENT IDENTIFICATION Company Name and OTHER PARTY NAME (Item 1.A.), and SELLER'S NAME (Item 3.B.) on Form EIA-858 are NOT considered confidential and may be publicly released in identifiable form. All other information you provide will be used for statistical purposes only. In accordance with the Confidential Information Protection provisions of Title V, Subtitle A of Public Law 107-347 and other applicable Federal laws, your responses will be kept confidential and will not be disclosed in identifiable form to anyone other than employees or agents without your consent. By law, every EIA employee, as well as every agent, is subject to a jail term, a fine of up to $250,000, or both if he or she discloses ANY identifiable information about you.

202

Appendix B Forms Note: Current versions of these forms (downloadable) are available on-line at  

E-Print Network [OSTI]

, MS-45 CEC Reg # (if applicable) California Energy Commission e-mail: RPSTrack@energy.state.ca.us: [www.energy.ca.gov/renewables/documents/index.html#rps] Some of these forms are new or have been Aggregate and Schedule 5: SB 1 Solar Program Status Report, are not directly applicable to the RPS program

203

EM Quality Assurance Assessment Schedule FY 2010  

Broader source: Energy.gov (indexed) [DOE]

DR. STFDlN L. KRAHN DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please provide your feedbadc on the suggested self-atxwssment dates by Monday, Apd 12,2010 (item 2, below). Tht scope a n d tim'mg of plaoned asseasments are designed to be relevant, timely, and & I value to enhaace QA performame of specific projects. EM-23 has developed the attached oversight prioritization methodology plan that takes into

204

Rate Schedule CV-NWT5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NWT5 NWT5 (Supersedes Schedule CV-NWT4) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR NETWORK INTEGRATION TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) Network Integration Transmission Service (NITS). Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to

205

Scheduling and allocation algorithm for an elliptic filter  

E-Print Network [OSTI]

A new evolutionary algorithm for scheduling and allocation algorithm is developed for an elliptic filter. The elliptic filter is scheduled and allocated in the proposed work which is then compared with the different scheduling algorithms like As Soon As Possible algorithm, As Late As Possible algorithm, Mobility Based Shift algorithm, FDLS, FDS and MOGS. In this paper execution time and resource utilization is calculated using different scheduling algorithm for an Elliptic Filter and reported that proposed Scheduling and Allocation increases the speed of operation by reducing the control step. The proposed work to analyse the magnitude, phase and noise responses for different scheduling algorithm in an elliptic filter.

Marikkannan, Sangeetha

2012-01-01T23:59:59.000Z

206

On dynamic scheduling of a parallel server system with certain graph structure  

E-Print Network [OSTI]

Primitives 2.3 Scheduling Control . Chapter 3 Sequence ofto be mutually independent. Scheduling Control The system isand service rates and scheduling control are allowed to vary

Pesic, Vladimir N.

2011-01-01T23:59:59.000Z

207

An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers  

E-Print Network [OSTI]

Flow scheduling and endpoint rate control in gridnetworks.granularity and ?ner control in scheduling with a cost ofMukherjee. Control plane for advance bandwidth scheduling in

Balman, Mehmet

2012-01-01T23:59:59.000Z

208

Space-Time Power Scheduling of MIMO Links—Fairness and QoS Considerations  

E-Print Network [OSTI]

design of link scheduling and power control. This would be aPower control, beamforming and link scheduling are alllink scheduling (temporal freedom) with MIMO power control (

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

209

Energy Consumption Scheduling in Smart Grid: A Non-Cooperative Game Approach  

E-Print Network [OSTI]

on Game- Theoretic Energy Consumption Scheduling for theIn this paper, energy consumption scheduling based on non-Energy Consumption Scheduling in Smart Grid: A Non-

Ma, Kai; Hu, Guoqiang; Spanos, Costas J

2014-01-01T23:59:59.000Z

210

Registration Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SNAP COLLABORATION MEETING JUNE 1 - 3, 2006 REGISTRATION FORM To register, please fill out the registration form below and click on the "SEND" button. Your registration will allow us to make security access and hospitality arrangements for you. Deadline: Please register NLT Wednesday, May 24, 2006. 1. Your Name (Last, First): 2. Your Institution: 3. Email address: 4. Citizenship (for non-DOE employees/guests): 5. Arrival date: 6. Departure Date: 7. Will you be attending the working dinner on Thursday, June 1? Yes No 8. Any dietary restrictions? Please click on the "Send" button below to email this form automatically to snap@lbl.gov. An automatic email reply receipt confirmation will be sent back to your email address. Send Reset Thank you!

211

Renewable energy-combined scheduling for electric vehicle charging  

Science Journals Connector (OSTI)

This paper designs a heuristic-based charging scheduler capable of integrating renewable energy for electric vehicles, aiming at reshaping power load induced from the large deployment of electric vehicles. Based on the power consumption profile as well as the preemptive charging task model which includes the time constraint on the completion time, a charging schedule is created as a form of time tables. Each entry indicates the source of power supply, namely, either regular power or renewable energy, and how much power is supplied to a vehicle. Basically, it assigns the charging operation to those slots having the smallest power load one at a time, taking different allocation orders according to slack, operation length, and per-slot power demand. Finally, the peaking task of the peaking slot is iteratively picked to assign renewable energy stored in the station battery. The performance measurement result shows that our scheme can reduce the peak load by up to 37.3% compared with the earliest allocation scheme for the given parameter set.

Junghoon Lee; Gyung-Leen Park

2014-01-01T23:59:59.000Z

212

Crosswalk between DOERS and Admin Schedules  

Broader source: Energy.gov (indexed) [DOE]

2/00 2/00 Cross-Walk -DOERS to Admin Sched rev2.wpd DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Item Number Description of Records DOE Administrative or Programmatic Schedule Number / Item NARA Case Number DOERS 1, Medical, Health and Safety Records DOERS 1, Item 1a Safety Management Records DOE Admin18, Item 11.1a, NC-326-75-2 DOERS 1, item 1 (b, c, d, & e) Safety Management Records DOE Admin 18, item 11.1 (c, d, e & f) II NNA-1023(2) II NNA-310(6) II NNA-1023(3) II NNA-409(25) DOERS 1, Item 2 Fire Unit Records DOE Admin18 ,Item 11.4 (a thru g) NC-430-76-2(3) II NNA-1858(1B) II NNA-2939 II NNA-1858(1C) II NNA-1858(E) II NNA-1858(1F) DOERS 1, Item 3 Medical or Health Research Project Case Files R & D Programmatic Schedule

213

Scheduling with Advanced Process Control Constraints  

E-Print Network [OSTI]

companies have to pay great attention to lower their produc- tion costs and guarantee high quality machine parameters so as to achieve satisfactory product quality. When there is a conflict between quality and scheduling ob- jectives, quality usually has to be satisfied. This paper studies the interaction between

Hasenbein, John

214

Hanford Treats Groundwater Ahead of Schedule  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. – EM’s Richland Operations Office and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) are ahead of schedule in meeting EM's annual goals for treating contaminated groundwater at the Hanford site in southeast Washington state.

215

Energy Conscious Scheduling Johnatan E. Pecero  

E-Print Network [OSTI]

Energy Conscious Scheduling Johnatan E. Pecero University of Luxembourg January 18, 2012 Green Days of Luxembourg Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy, microsoft) 9 Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy

Lefèvre, Laurent

216

Advance Resource Provisioning in Bulk Data Scheduling  

SciTech Connect (OSTI)

Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

Balman, Mehmet

2012-10-01T23:59:59.000Z

217

ALA-1-N Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Document Available for Download ALA-1-N Rate Schedule More Documents & Publications MISS-1-N Wholesale Power Rate Schedule

218

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

219

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

220

Gain Scheduled Control Using the Dual Youla Parameterization  

E-Print Network [OSTI]

Stability is a critical issue in gain-scheduled control problems in that the closed loop system may not be stable during the transitions between operating conditions despite guarantees that the gain-scheduled controller stabilizes the plant model...

Chang, Young Joon

2011-08-08T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Weapon Scheduling Method for Cooperative Air-Defense Operation  

Science Journals Connector (OSTI)

By defining the weapon scheduling plan and weapon combat action, the mathematical formulation of weapon scheduling problem for cooperative air-defense operation ... the basis of discussing the primary constraints...

Liang Yu; Changfeng Xing…

2012-01-01T23:59:59.000Z

222

A Modified Energy Saving Scheduling Algorithm on Heterogeneous Systems  

Science Journals Connector (OSTI)

Efficient application scheduling with low energy consumption is critical for achieving high performance ... a new schedule scheme which concentrates on the energy consumption of supply voltage’s varying and a mod...

An Shen; Yuming Xu

2014-01-01T23:59:59.000Z

223

University at Buffalo (SUNY) Department of Industrial Engineering Scheduling Theory  

E-Print Network [OSTI]

University at Buffalo (SUNY) Department of Industrial Engineering IE 661 Scheduling Theory Chapter 1 Rakesh Nagi Department of Industrial Engineering University at Buffalo (SUNY) #12;University at Buffalo (SUNY) Department of Industrial Engineering Chapter 1: Introduction Role of Scheduling Allocation

Nagi, Rakesh

224

Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...  

National Nuclear Security Administration (NNSA)

Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading Ahead of Schedule applicationmsword icon NR-01-10...

225

Impact of User Mobility and Asymmetry on Multiuser Scheduler Performance  

E-Print Network [OSTI]

Impact of User Mobility and Asymmetry on Multiuser Scheduler Performance Pengcheng Zhan, Ramesh throughput for fairness across UTs by scheduling the UTs based on the instantaneous channel Pengcheng Zhan

Swindlehurst, A. Lee

226

Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules  

SciTech Connect (OSTI)

The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

Center for Energy and Innovative Technologies; NEC Laboratories America Inc.; Cardoso, Goncalo; Stadler, Michael; Bozchalui, Mohammed C.; Sharma, Ratnesh; Marnay, Chris; Barbosa-Povoa, Ana; Ferrao, Paulo

2013-10-27T23:59:59.000Z

227

ESPC Task Order Schedules and Placement of Pricing Information  

Broader source: Energy.gov [DOE]

Document provides task order (TO) schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs).

228

5 - Load Balance Scheduling for Cloud Data Centers  

Science Journals Connector (OSTI)

This chapter introduces online load balance scheduling for Cloud data centers. One of the challenging scheduling problems in Cloud data centers is the allocation and migration of reconfigurable virtual machines and integrated features of hosting physical machines. We first propose an online resource scheduling algorithm (OLRSA), which considers real-time and multidimensional resource scheduling. Besides OLRSA, a Lowest Integrated-load First Algorithm (LIF) is also introduced. Performance evaluation of both algorithms against other existing algorithms is provided by simulation.

Wenhong Tian; Yong Zhao

2015-01-01T23:59:59.000Z

229

Order Acceptance and Scheduling Problem in Two-machine Flow ...  

E-Print Network [OSTI]

Jul 29, 2014 ... Order Acceptance and Scheduling Problem in Two-machine Flow Shops: New Mixed Integer Programming Formulations.

Rasul Esmaeilbeigi

2014-07-29T23:59:59.000Z

230

Efficient Scheduling and Grant Sizing Methods for WDM PONs  

Science Journals Connector (OSTI)

Bandwidth allocation and transmission grant scheduling are problems of particular interest to multichannel passive optical networks (PONs). While ...

Kiaei, Mohammad S; Meng, Lehan; Assi, Chadi; Maier, Martin

2010-01-01T23:59:59.000Z

231

Hybrid Time Formulation for Diesel Blending and Distribution Scheduling  

Science Journals Connector (OSTI)

Hybrid Time Formulation for Diesel Blending and Distribution Scheduling ... Schematic of diesel in-line blending and distribution infrastructure. ...

Sérgio M. S. Neiro; Valéria V. Murata; José M. Pinto

2014-06-13T23:59:59.000Z

232

Form1  

Broader source: Energy.gov (indexed) [DOE]

B. U.S. DEPARTMENT OF ENERGY FORM 3304.2, B. U.S. DEPARTMENT OF ENERGY FORM 3304.2, APPROVAL OF EXPERT OR CONSULTANT EMPLOYMENT REQUEST U.S.DEPARTMENT OF ENERGY APPROVAL OF EXPERT OR CONSULTANT EMPLOYMENT REQUEST (Continued on Reverse) DOE F 3304.2 (01-07) 1. Name of Expert or Consultant: 2. Organization: 9. Current Employment (position, company, and location): 10. Home Address (city, state, and zip code): 11. Official Worksite (where services are to be performed): 12. APPROVALS 3. Action Requested: 4. Hourly Rate of Pay: 5. Nature of Appointment: 6. Period for Which Services Are Desired: 7. Estimated Number of Days to Be Worked: 8. Number of Days Worked Under Present Appointment: (Extension Only) 13. Description of Services Required: 14. Justification for this Expert/Consultant Action and Qualifications of Candidate Related to Need for Appointment:

233

Using a SAT-solver to schedule sports leagues  

Science Journals Connector (OSTI)

Tournament schedules of sports leagues have to satisfy several types of constraints such as stadium unavailability, fixed matches, forbidden matches, minimum number of breaks. Usually, there is no schedule satisfying all given constraints and, hence, ... Keywords: Propositional satisfiability, Round robin tournaments, Soft constraints, Sports, Sports league scheduling, Timetabling

Andrei Horbach; Thomas Bartsch; Dirk Briskorn

2012-02-01T23:59:59.000Z

234

Design and Evaluation of a Feedback Control EDF Scheduling Algorithm *  

E-Print Network [OSTI]

Design and Evaluation of a Feedback Control EDF Scheduling Algorithm * * Supported in part by NSF. In this paper, we present a feedback control real­time scheduling algorithm and its evaluation. Performance}@cs.virginia.edu, + gt9s@virginia.edu Abstract Despite the significant body of results in real­time scheduling, many real

Son, Sang H.

235

Symbolic Scheduling Techniques 1 Ivan Radivojevi c, Forrest Brewer  

E-Print Network [OSTI]

- constrained scheduling which allows speculative operation execution in arbitrary forward-branching control subject to data/control-flow dependencies and resource constraints. Priority- based heuristic scheduling on detection of mutual exclusiveness in control/data-flow graphs (CDFGs). Tree scheduling (TS) [8] uses a tree

Brewer, Forrest D.

236

Stochastic Sensor Scheduling for Networked Control Systems Farhad Farokhi  

E-Print Network [OSTI]

Stochastic Sensor Scheduling for Networked Control Systems Farhad Farokhi and Karl H. Johansson Abstract Optimal sensor scheduling with applications to networked estimation and control systems to optimal control of Markov chains, we extract an optimal scheduling policy to fairly allocate the network

Johansson, Karl Henrik

237

Queueing-Theoretic Approaches for Dynamic Scheduling: Daria Terekhova  

E-Print Network [OSTI]

, 1999) Scheduling and control of flexible manufacturing sys- tems: a critical review (Basnet and MizeQueueing-Theoretic Approaches for Dynamic Scheduling: A Survey Daria Terekhova , Douglas G. DownbMaster University, Canada downd@mcmaster.ca Within the combinatorial scheduling community, there has been

Down, Doug

238

Constraint-based Scheduling Markus P.J. Fromherz  

E-Print Network [OSTI]

such as product assembly se- quencing. This makes constraint-based scheduling interesting to the control community planning, scheduling, and control tasks. This tutorial gives a brief introduction to constraint and reconfigurable con- trol, and the integration of various planning, scheduling, and control tasks

Fromherz, Markus P.J.

239

The Control of Burstiness in Fair Queueing Scheduling Liat Ashkenazi  

E-Print Network [OSTI]

The Control of Burstiness in Fair Queueing Scheduling Liat Ashkenazi and Hanoch Levy School to other scheduling algorithms. Those algorithms, in contrast, are subject to the burstiness problem. This paper studies the issue of bursty transmission in packet scheduling algo- rithms. We propose the Burst

Levy, Hanoch

240

Design of Gain-Scheduled Strictly Positive Real Controllers  

E-Print Network [OSTI]

Design of Gain-Scheduled Strictly Positive Real Controllers Using Numerical Optimization the linear SPR controllers, which compose the gain-scheduled controller. Second, we formulate the optimization problem associ- ated with the gain-scheduled controller itself. Restricting our in- vestigation

Damaren, Christopher J.

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Energy Efficient Scheduling with Power Control for Wireless Networks  

E-Print Network [OSTI]

Energy Efficient Scheduling with Power Control for Wireless Networks Bastian Katz Institute the complexity of scheduling with power control in the SINRG model of interference. Based on a novel scheme) and less energy consumption: power control admits schedules that would otherwise violate interference

Paris-Sud XI, Université de

242

Feedback Control RealTime Scheduling: Framework, Modeling, and Algorithms *  

E-Print Network [OSTI]

1 Feedback Control Real­Time Scheduling: Framework, Modeling, and Algorithms * Chenyang Lu John A}@virginia.edu Abstract This paper presents a feedback control real­time scheduling (FCS) framework for adaptive real. In particular, we establish a dynamic model and performance analysis of several feedback control scheduling

Son, Sang H.

243

Multichannel Scheduling and Its Connection to Queueing Network Control Problem  

E-Print Network [OSTI]

Multichannel Scheduling and Its Connection to Queueing Network Control Problem Pouya Tehrani , Qing scheduling problem and a closed queueing network control problem which is known to be EXP-complete, we obtain {potehrani,qzhao}@ucdavis.edu Abstract--We consider the multichannel scheduling problem where the data rate

Islam, M. Saif

244

Computing Schedules for Time-Triggered Control using Genetic Algorithms  

E-Print Network [OSTI]

Computing Schedules for Time-Triggered Control using Genetic Algorithms Truong Nghiem Georgios E scheduling problem for timed-triggered controllers (OSTTC) and the time complexity of the corresponding search. Keywords: Scheduling; Digital control; Genetic algorithms; 1. INTRODUCTION Digital control theory

Fainekos, Georgios E.

245

Scheduling and Feedback Co-Design for Networked Control Systems  

E-Print Network [OSTI]

Scheduling and Feedback Co-Design for Networked Control Systems Michael S. Branicky,1 Stephen M mes- sages are transmitted). In the past, control system design and CPU scheduling or network scheduling design have normally been sepa- rated. This separation has allowed the control commu- nity

Branicky, Michael S.

246

A Cooperative Approach for Job Shop Scheduling under Uncertainties  

E-Print Network [OSTI]

control, consists to use a two-level resolution scheme: an off-line scheduling level builds upA Cooperative Approach for Job Shop Scheduling under Uncertainties C. BRIANDa,1 , S. OURARIb and B on job shop scheduling problems in a cooperative environment. Unlike classical deterministic approaches

Briand, Cyril

247

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY  

E-Print Network [OSTI]

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY JIE LIN*, University of Illinois Institute A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY Abstract This paper develops and demonstrates a quality control framework for bus schedule reliability. Automatic Vehicle Location (AVL) devices

Illinois at Chicago, University of

248

Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms*  

E-Print Network [OSTI]

1 Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms* Chenyang Lu John A}@virginia.edu Abstract This paper presents a feedback control real-time scheduling (FCS) framework for adaptive real. In particular, we establish a dynamic model and performance analysis of several feedback control scheduling

Son, Sang H.

249

A Novel Approach to Workflow Scheduling in MediGRID  

E-Print Network [OSTI]

A Novel Approach to Workflow Scheduling in MediGRID Dietmar Sommerfeld1 and Harald Richter2 If (Hardware and Robotics) #12;A Novel Approach to Workflow Scheduling in MediGRID Dietmar Sommerfeld1 four problems inherent to Grid scheduling that could be identified by means of measurements in the D-Grid

Zachmann, Gabriel

250

A New I/O Scheduler for Solid State Devices  

E-Print Network [OSTI]

parameters of solid state drives. Using the information from the parameter extraction, we present a new I/O scheduler design which utilizes the structure of solid state devices to efficiently schedule writes. The new scheduler, implemented on a 2.6 Linux...

Dunn, Marcus P.

2010-10-12T23:59:59.000Z

251

ON THE CONFIGURATION-LP FOR SCHEDULING ON UNRELATED MACHINES  

E-Print Network [OSTI]

ON THE CONFIGURATION-LP FOR SCHEDULING ON UNRELATED MACHINES JOSÃ? VERSCHAE AND ANDREAS WIESE Abstract. One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm

Nabben, Reinhard

252

Opportunistic Scheduling for utility maximization under QoS constraints  

E-Print Network [OSTI]

1 Opportunistic Scheduling for utility maximization under QoS constraints Neung-Hyung Lee, Jin. Our opportunistic scheduling aims at maximizing the utility which is usually expressed as a function of user throughput. In this paper we derive an off-line optimal scheduling policy by optimization theory

Bahk, Saewoong

253

Utility Accrual Real-Time Scheduling for Multiprocessor Embedded Systems  

E-Print Network [OSTI]

Utility Accrual Real-Time Scheduling for Multiprocessor Embedded Systems Hyeonjoong Cho a Binoy We present the first Utility Accrual (or UA) real-time scheduling algorithm for mul- tiprocessors, called global Multiprocessor Utility Accrual scheduling algorithm (or gMUA). The algorithm considers

Ravindran, Binoy

254

PREEMPTIVE RESUME SCHEDULING Alain Roy and Miron Livny  

E-Print Network [OSTI]

Chapter 9 CONDOR AND PREEMPTIVE RESUME SCHEDULING Alain Roy and Miron Livny Department of Computer. This introduces a number of problems, some of which are solved by Condor's preemptive resume scheduling, which is the focus of this paper. Pre- emptive resume scheduling allows jobs to be interrupted while running

Roy, Alain

255

A Joint Transmission Grant Scheduling and Wavelength Assignment in Multichannel SG-EPON  

Science Journals Connector (OSTI)

In this paper, we investigate the problem of transmission grant scheduling in multichannel optical access networks using a scheduling theoretic ...

Meng, Lehan; El-Najjar, Jad; Alazemi, Hamed; Assi, Chadi

2009-01-01T23:59:59.000Z

256

Process for Scheduling Electives The Student Affairs/MSP Office collects core clerkship scheduling requests from rising M-3 and  

E-Print Network [OSTI]

rotations for this time and have no control over other schools' scheduling processes. wwwUICOM - UC Process for Scheduling Electives The Student Affairs/MSP Office collects core clerkship scheduling requests from rising M-3 and M-4 students. Individual clinical departments arrange other

Gilbert, Matthew

257

Abstract--A simple method is presented to reduce the number of scheduling parameters for gain-scheduled  

E-Print Network [OSTI]

to a zero- parameter or LTI controller design problem in the dimensionless domain. The dimensionless gain-scheduling. Index Terms--Gain scheduling, gantry control, pi theorem, dimensionless parameters, nondimensional representation I. INTRODUCTION AIN scheduling is a popular method to control systems whose linearized model

Brennan, Sean

258

Jefferson Lab Science Series - Current Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Science Series Schedule Current Science Series Schedule Lectures are free and open to students and adults with an interest in science. All lectures begin at 7:00 pm in CEBAF Center Auditorium [Download a Map] [Locate Jefferson Lab on Google Maps] [Display a QR Code for Scanning] and last for about an hour. Seating in the CEBAF Center Auditorium and overflow area is limited to about 300 people. Seating is on a first come, first served basis. Unfortunately, people arriving once capacity has been reached will be turned away. A live video stream will be available for those not able to attend in person. Lectures will be added to the video archive for on-demand viewing upon approval from the presenter. NOTICE: For security purposes, everyone over 16 is asked to carry a photo I.D. Security guards may inspect vehicles, book bags and purses.

259

400A Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APCF APCF Past APCF Memoranda APCF Past Construction Past APCF Construction Day Activity Impact Monday - 10.01.12 Excavation Small Concrete Small Site Utilities Small Tuesday - 10.02.12 Excavation Small Concrete Small Site Utilities Small Wednesday - 10.03.12 Excavation Small Concrete Small Site Utilities Moderate Thursday - 10.04.12 Excavation Small Concrete Small Site Utilities Moderate Friday - 10.05.12 Excavation Small Concrete Small Site Utilities Moderate Site Utility water line hot tap Moderate Saturday - 10.06.12 No work is scheduled for the weekends -/- Sunday - 10.07.12 No work is scheduled for the weekends -/- Monday - 10.08.12 Excavation Small Concrete Small Interior underground plumbing Small Site Utilities Moderate Site Utility water line hot tap Moderate

260

Physical Chemistry of Ionic Liquids Symposium Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Tentative Schedule, locations and times to be determined) (Tentative Schedule, locations and times to be determined) Sunday Morning Structure and Heterogeneity of Ionic Liquids I. James Wishart and Edward Castner Introductory Remarks Andre Pinkert Hydroxyamine ionic liquids and their properties Thomas Strassner TAAILs - Tunable Aryl-Alkyl Ionic Liquids: A new generation of ionic liquids Laura Sprunger Grubbs Thermodynamic Properties of New Generation Ionic Liquids Christopher Hardacre Prediction methods for physical properties of ionic liquids BREAK Patricia Hunt What happens when you functionalise an ionic liquid with a "silicone" side chain? Edward L Quitevis Effect of cation symmetry and nanoscale segregation on the morphology, physical properties, and low-frequency vibrational dynamics of 1,3-dialkylimidazolium cation ionic liquids

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Rate Schedule COTP-T3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COTP-T3 COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving California-Oregon Transmission Project (COTP) firm and/or non-firm point-to-point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

262

Hilton Alexandria Mark Center Shuttle Schedule  

Broader source: Energy.gov (indexed) [DOE]

Hilton Alexandria Mark Center Shuttle Schedule Hilton Alexandria Mark Center Shuttle Schedule 5000 Seminary Road, Alexandria, VA 22311 703-845-1010 The Hilton Alexandria Mark Center offers complimentary shuttle service every half hour at :00 and :30, 7 days a week. Our first departure from the hotel is 6:00 AM and our last departure from the hotel is 10:30 pm, to Pentagon City Mall/Metro (on the blue and yellow line) and Ronald Reagan Washington National Airport The van arrives at Pentagon City at approximately 10 and 40 minutes after the hour. Our last pick up is at approximately 10:40pm. Upon exiting the metro, exit left, and take the escalator outside. We pick up at the island in front of the Ritz Carlton and Fashion Center Mall. The next stop is Ronald Reagan Washington National Airport The van arrives at the airport at approximately 20 and 50 minutes after the

263

Rate Schedule CV-F13  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

F13 F13 (Supersedes Schedule CV-F12) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATES FOR BASE RESOURCE AND FIRST PREFERENCE POWER Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To the Base Resource (BR) and First Preference (FP) Power Customers. Character and Conditions of Service: Alternating current, 60-hertz, three-phase, delivered and metered at the voltages and points established by contract. This service includes the Central Valley Project (CVP) transmission (to include reactive supply and voltage control from Federal generation sources needed to support

264

Rate Schedule CV-TPT7  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TPT7 TPT7 (Supersedes Schedule CV-TPT6) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To Western's power service customers who require transmission service by a third party to receive power sold by Western. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points as

265

Duke-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

266

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

267

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

268

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

269

Santee-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

270

Pump-2 Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 Wholesale Power Rate Schedule 2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

271

Integrated test schedule for buried waste integrated demonstration  

SciTech Connect (OSTI)

The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ``windows of opportunity`` schedule. The ``windows of opportunity`` schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.

Brown, J.T.; McDonald, J.K.

1992-05-01T23:59:59.000Z

272

Integrated test schedule for buried waste integrated demonstration  

SciTech Connect (OSTI)

The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration windows of opportunity'' schedule. The windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.

Brown, J.T.; McDonald, J.K.

1992-05-01T23:59:59.000Z

273

Duke-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

274

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

275

Adaptable search neighborhoods for Resource Constrained Scheduling  

E-Print Network [OSTI]

dispatching rule. When evaluating the merit of the schedule associated with (L, p), the original data set, ps, is usecl. Three msiu advantages result from the use of these new search spaces. First, problem specific knowledge is incorporated into the search...) dispatching if the perfcrmance is based on completion times (makespsn. or f. . 'ow-tirres), or use earliest-due-date (EDD) dispatching if the performance is due-dste based (tardiness). In order to illustrate the implementation of these concepts, examples...

Balakrishnan, Ramamoorthy

1993-01-01T23:59:59.000Z

276

Form Approv  

Broader source: Energy.gov (indexed) [DOE]

'JOE I' ':0 'JOE I' ':0 ) e " Flee/romc Form Approv ed by CGIR· 01120195 (8 ./1" United States Government Department of Energy Bonneville Power Administra ion memorandum DATE : uC l J !:' ZD y REPLY TO ATTN OF : KEP-4 SUBJECT: Environmental Clearance Memorandum TO ; Rob Ochs Project Manager - TELM-TPP-3 Proposed Action: Lane-Wendson No.1 Structure 10/5 Access Road Improvement and Pole Replacement Project Budget Information: Work Order # 224549 PP&A Project No.: 1117 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Sub part 0,10 C.F.R. Part) 021): B 1.3, Routine maintenance activities ... for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ... .are required to maintain

277

Site Specific Records Schedules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Site Specific Records Schedules Site Specific Records Schedules Site Specific Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. TITLE DATE LAST CHANGED AUTHORIZATION NUMBER AEC -- Administrative Record (pdf) 01/15/01 II-NNA-6754 AEC -- Nuclear Power Plant Docket Records (pdf) 01/15/01 NC-174-231 AEC -- Power Reactor Records (pdf) 01/15/01 II-NNA-2110 Alaska Power Administration (pdf) 02/09/01 N1-447-97-1 Appointee Clearance and Vetting Files (pdf) 09/10/02 N1-434-96-3 Bettis Atomic Laboratory Naval Reactors (pdf) 09/09/91 N1-434-91-8 Bonneville Power Administration (pdf) 08/06/07 N1-305-07-1 Cyclotron Records, Lawrence Berkeley National Laboratory (pdf) 12/22/88 N1-434-89-7 Energy Information Administration (EIARS) (pdf) 10/21/03 N1-434-96-2

278

Hanford Site Environmental Surveillance Master Sampling Schedule  

SciTech Connect (OSTI)

Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection.

LE Bisping

2000-01-27T23:59:59.000Z

279

Weekly Natural Gas Storage Report Schedule  

Weekly Natural Gas Storage Report (EIA)

Weekly Natural Gas Storage Report Schedule Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day 12/27/2013 Friday 10:30 a.m. 12/25/2013 (Wednesday) is Christmas Day 1/3/2014 Friday 10:30 a.m. 1/1/2014 (Wednesday) is New Year's Day 11/14/2014 Friday 10:30 a.m. 11/11/2014 (Tuesday) is Veterns Day 11/26/2014 Wednesday 12:00 p.m. 11/27/2014 (Thursday) is Thanksgiving Day 12/24/2014 Wednesday 12:00 p.m. 12/25/2014 (Thursday) is Christmas Day 12/31/2014 Wednesday 12:00 p.m. 1/1/2015 (Thursday) is New Year's Day

280

Royalty Payments & Tax Treaty Procedures Information and IRS forms for MIT Press authors  

E-Print Network [OSTI]

Royalty Payments & Tax Treaty Procedures Information and IRS forms for MIT Press authors Forms the forms. Royalty Payment Schedule Royalty statements and payments will be made for each royalty year will not be returned. Please see page 3 of the W-7 application for complete details. Tax Treaty Claim on Royalty

Jackson, Daniel

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Solar Decathlon 2005 Daily Event Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DAILY EVENT SCHEDULE DAILY EVENT SCHEDULE Last updated on September 30, 2005 Note: This schedule is not part of the official Rules and Regulations and is subject to change at any time. Weds, Sept 28 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM Registration Forrestal Bldg (DOE) Cafeteria National Mall Team/Organizer meeting and Safety Orientation Thurs, Sept 29 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00

282

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

283

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

284

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

285

Descriptions of Task Order Schedules and Placement of Pricing Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

286

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

287

SOCO-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

288

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

289

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

290

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

291

Santee-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

292

Descriptions of Task Order Schedules and Placement of Pricing Information  

Broader source: Energy.gov (indexed) [DOE]

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

293

Duke-3-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer.

294

Duke-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

295

Santee-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

296

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

297

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

298

CTVI-1-A Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Document Available for Download CTVI-1-A Rate Schedule More Documents & Publications

299

APS Long Range Operations Schedule FY2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10) 10) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2009-3 2010-1 2010-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

300

APS Long Range Operations Schedule FY2009  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09) 09) Alternate Formats: iCal | Excel | PDF APS Long Range Operation Schedule (FY2009) 2008-3 2009-1 2009-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Computer Generating Forms and Other Related Processing Procedures  

E-Print Network [OSTI]

Computer Generating Forms and Other Related Processing Procedures for Students Graduate Assistants Executive /B # - BROWSE SELECTED BULLETIN TITLES BELOW. 1 - LSU Computer Access Policy Statement N2 2 - LSU Use of Computing Resources Policy N4 3 - LSU Computing Services Universal Schedule N1 The following

302

Optimal investment and scheduling of distributed energy resources with  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

investment and scheduling of distributed energy resources with investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Title Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Publication Type Journal Article LBNL Report Number LBNL-6471E Year of Publication 2013 Authors Cardoso, Gonçalo, Michael Stadler, Mohammad Bozchalui, Ratnesh Sharma, Chris Marnay, Ana Barbosa-Póvoa, and Paulo Ferrão Journal Energy Date Published 10/2013 Abstract The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

303

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Broader source: Energy.gov (indexed) [DOE]

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

304

MIT Plasma Science & Fusion left: research>alctor>meetings scheduled  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of larger Directory of Plasma Conferences list with some additions (see also the Nuclear Fusion calendar). ITPA meetings schedule Fusion meetings calendars Conference, Workshop,...

305

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network [OSTI]

constant functions as well as control policies that can be described by a small set ... We address the problem of scheduling production of multiple products on a ...

2012-01-12T23:59:59.000Z

306

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network [OSTI]

The integration of lot-sizing, scheduling and safety stock planning is a major challenge in multi- product inventory .... Generic policy search for production control.

2014-03-31T23:59:59.000Z

307

Scheduling co-operating stacking cranes with predetermined ...  

E-Print Network [OSTI]

Nov 7, 2011 ... Crane scheduling in container terminals is known as a difficult optimization problem .... an overview focussing on design and control issues.

2011-11-19T23:59:59.000Z

308

Oversight Scheduling and Operational Awareness at the Savannah...  

Office of Environmental Management (EM)

Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 0325...

309

Optimization Online - Fast Approximations for Online Scheduling of ...  

E-Print Network [OSTI]

Jun 19, 2014 ... Fast Approximations for Online Scheduling of Outpatient Procedure Centers. Berg(bberg2 ***at*** gmu.edu) Denton(btdenton ***at*** ...

Berg

2014-06-19T23:59:59.000Z

310

FLEX TIME (ALTERNATIVE WORK SCHEDULE) REQUEST EMPLOYEE INFORMATION  

E-Print Network [OSTI]

(Hours) Proposed Alternative Work Schedule (Hours) Days On-Site Off-Site On-Site Off-Site Monday Tuesday

Dasgupta, Dipankar

311

National Labs Commission Phase I Public Schedule | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Labs Commission Phase I Public Schedule More Documents & Publications Hydrogen Generator Appliance Natural Gas and Hydrogen Infrastructure Opportunities Workshop Agenda...

312

Single-Machine Two-Agent Scheduling Problems with ...  

E-Print Network [OSTI]

Jan 24, 2014 ... Abstract: We address a class of deterministic scheduling problems in which two agents compete for the usage of a single machine. The agents ...

Gaia Nicosia

2014-01-24T23:59:59.000Z

313

A hybrid Lagrangean metaheuristic for single machine scheduling ...  

E-Print Network [OSTI]

Aug 8, 2014 ... A hybrid Lagrangean metaheuristic for single machine scheduling problem with sequence-dependent setup times and due dates.

Thiago Henrique Nogueira

2014-08-08T23:59:59.000Z

314

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network [OSTI]

decisions on parallel CNC machines: -constraint approach.bounding mechanism for the CNC machine scheduling problemsprocessing times is the CNC turning operation where

Aktürk, M. Selim; Atamtürk, Alper; Gürel, Sinan

2010-01-01T23:59:59.000Z

315

ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...  

Broader source: Energy.gov (indexed) [DOE]

3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of...

316

Flow Shop Scheduling with Peak Power Consumption Constraints  

E-Print Network [OSTI]

To conduct our experiments, we considered a hypothetical flow shop scheduling ... There are two types of machines with different operations: face milling. 16 ...

2012-09-23T23:59:59.000Z

317

Stochastic flow shop scheduling model for the Panama Canal.  

E-Print Network [OSTI]

??The Panama Canal can be modeled as a stochastic flexible flow shop for the purpose of scheduling. A metaheuristic stochastic optimization method (Nested Partition) was… (more)

de Castillo, Zoila Yadira Guerra

2006-01-01T23:59:59.000Z

318

Optimization Online - Stochastic Real-Time Scheduling of Wind ...  

E-Print Network [OSTI]

Jan 3, 2015 ... Stochastic Real-Time Scheduling of Wind-thermal Generation Units in ... Keywords: conditional value at risk, uncertainty modeling, wind energy.

Alireza Soroudi

2015-01-03T23:59:59.000Z

319

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Broader source: Energy.gov (indexed) [DOE]

: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS Payrolling and pay administration records pertain to the...

320

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Broader source: Energy.gov (indexed) [DOE]

2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 Payrolling and pay administration records...

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

-Gator Lift scheduling requests must be submitted by 2 PM the day before you need transportation -Please call (352) 494-2305 at least one hour prior to your first ride of the day to finalize your pick-up time  

E-Print Network [OSTI]

- Gator Lift scheduling requests must be submitted by 2 PM the day before you need transportation This Form To Gator Lift Staff 1. Choose "File, Save As" from the command menu and save the form as a PDF

Wu, Dapeng Oliver

322

APS Long Range Schedule FY1997  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Beamline Operations Schedule 7 Beamline Operations Schedule January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 6 7 8 9 10 11 12 00:00-08:00 MS MS UO UO UO UO UO 08:00-16:00 MS UO UO UO SV UO UO 16:00-24:00 MS UO UO UO UO UO UO 13 14 15 16 17 18 19 00:00-08:00 UO UO UO UO UO MS MS 08:00-16:00 UO SV SV Contingency UO MS MS MS 16:00-24:00 UO UO UO UO MS MS MS 20 21 22 23 24 25 26 00:00-08:00 MS UO UO UO UO UO MS 08:00-16:00 UO UO SV Contingency UO UO MS MS 16:00-24:00 UO UO UO UO UO MS MS 27 28 29 30 31 1 2 00:00-08:00 MS SM SM SM SM SM SM 08:00-16:00 MS SM SM SM SM SM SM 16:00-24:00 MS SM SM SM SM SM SM FEB Monday Tuesday Wednesday Thursday Friday Saturday Sunday

323

APS Long Range Schedule FY1998  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Beamline Operations Schedule 8 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 5 6 7 8 9 10 11 0000 - 0800 SM SM SM MS MS MS MS 0800 - 1600 SM SM* MS MS MS MS MS 1600 - 2400 SM SM MS MS MS MS MS Week 2 12 13 14 15 16 17 18 0000 - 0800 MS MS UO UO UO UO UO 0800 - 1600 MS* UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 3 19 20 21 22 23 24 25 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO JAN/FEB 26 27 28 29 30 31 1 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS SOM UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 5 2 3 4 5 6 7 8 0000 - 0800 UO MS UO UO UO UO UO

324

APS Long Range Schedule FY1999  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 Beamline Operations Schedule 9 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 18 19 20 21 22 23 24 0000 - 0800 MS MS MS MS UO UO UO 0800 - 1600 MS MS MS UO UO UO UO 1600 - 2400 MS MS MS UO UO UO UO Week 2 25 26 27 28 29 30 31 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO FEB 1 2 3 4 5 6 7 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 4 8 9 10 11 12 13 14 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO* UO UO UO 1600 - 2400 UO UO UO UO UO UO UO Week 5 15 16 17 18 19 20 21 0000 - 0800 UO MS MS UO UO U O UO

325

APS Long Range Schedule FY1996  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Long Range Commissioning Schedule for FY1996 Long Range Commissioning Schedule for FY1996 Date First Shift 0:00-8:00 Second Shift 8:00-16:00 Third Shift 16:00-24:00 3/15/96 SR Studies 1-ID-A Shielding Verification SR Studies 3/23/96 SR Studies 3-ID-A , 2-ID-A , 3-ID-B Shielding Verifications User Beam 3/24/96 User Beam User Beam User Beam 3/25/96 User Beam 19-ID-A Shielding Verification User Beam 3/26/96 User Beam 2-ID-A , 12-BM-A Shielding Verifications User Beam 3/27/96 User Beam 5-BM-A Shielding Verification User Beam 3/28/96 User Beam 19-ID-C Shielding Verification User Beam until 20:00 3/29/96 SR Studies SR Studies SR Studies 3/30/96 SR Studies SR Studies SR Studies 3/31/96 SR Studies SR Studies SR Studies 4/1/96 SR Studies SR Studies SR Studies 4/2/96 SR Studies 5-BM-B Shielding Verification User Beam

326

Hanford Site Environmental Surveillance Master Sampling Schedule  

SciTech Connect (OSTI)

Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations.

LE Bisping

1999-02-12T23:59:59.000Z

327

Weekly Natural Gas Storage Report Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

‹ Weekly Natural Gas Storage Report ‹ Weekly Natural Gas Storage Report Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 7/6/2012 Friday 10:30 a.m. 7/4/2012 (Wednesday) is Independence Day 11/21/2012 Wednesday 12:00 p.m. 11/22/2012 (Thursday) is Thanksgiving Day 12/28/2012 Friday 10:30 a.m. 12/25/2012 (Tuesday) is Christmas Day 1/4/2013 Friday 10:30 a.m. 1/1/2013 (Tuesday) is New Year's Day 7/3/2013 Wednesday 12:00 p.m. 7/4/2013 (Thursday) is Independence Day 10/22/2013 Tuesday 10:30 a.m. EIA Closed 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day

328

Benefits Forms and Information | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

New Employee Orientation » Benefits Forms and New Employee Orientation » Benefits Forms and Information Benefits Forms and Information As a Federal employee, you may have the opportunity to participate in a number of employee benefit and family-friendly programs. If your appointment to Federal employment confers eligibility, you may elect to participate in health, dental, and life insurance programs; retirement savings plans; flexible spending accounts; long-term care insurance; and vacation and sick leave. In addition, there are a number of family-friendly programs that the Department of Energy (DOE) offers its employees, such as alternative work schedules, flexiplace/telecommuting, transit subsidy, child development centers, and exercise and wellness facilities. The employment forms found in this section collect important and necessary

329

Form Approval: OMB No. 1905-0129  

U.S. Energy Information Administration (EIA) Indexed Site

Due Date: 2013 Due Date: 2013 Form Approval: OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden hours: 0.75 SCHEDULE 1. IDENTIFICATION Contact Information Form EIA-861S ANNUAL ELECTRIC POWER INDUSTRY REPORT (Short Form) NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections see the provisions on sanctions and the provisions concerning the confidentiality of information in the instructions. Title 18 U.S.C. 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. Entities that report using the Form EIA-861 do

330

Form EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC GENERATOR REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

INSTRUCTIONS INSTRUCTIONS Year: 2013 No. 1905-0129 Approval Expires: 12/31/2015 Burden: 0.3 Hours PURPOSE Form EIA-860M collects data on the status of: a) Proposed new generators scheduled to begin commercial operation within the subsequent 12 months; b) Existing generators scheduled to retire from service within the subsequent 12 months; and c) Existing generators that have proposed modifications that are scheduled for completion within one month. The data collected on this form appear in the EIA publication Electric Power Monthly. They are also used to monitor the current status and trends of the electric power industry and to evaluate the future of the industry. REQUIRED RESPONDENTS Respondents to the Form EIA-860M who are required to complete this form are all Form EIA-860,

331

FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC GENERATOR REPORT  

U.S. Energy Information Administration (EIA) Indexed Site

PURPOSE Form EIA-860M collects data on the status of: a) Proposed new generators scheduled to begin commercial operation within the subsequent 12 months; b) Existing generators scheduled to retire from service within the subsequent 12 months; and c) Existing generators that have proposed modifications that are scheduled for completion within one month. The data collected on this form appear in the EIA publication Electric Power Monthly. They are also used to monitor the current status and trends of the electric power industry and to evaluate the future of the industry. REQUIRED RESPONDENTS Respondents to the Form EIA-860M who are required to complete this form are all Form EIA-860, ANNUAL ELECTRIC GENERATOR REPORT, respondents who have indicated in a previous filing to

332

A model, a heuristic and a decision support system to solve the scheduling problem of an earth observing satellite constellation  

Science Journals Connector (OSTI)

China plans to launch four small optical satellites and four small SAR satellites to form a natural disaster monitoring constellation. Data can be obtained by the constellation in all weather conditions for disaster alert and environmental damage analysis. The scheduling problem for the constellation consists of selecting and timetabling the observation activities to acquire the requested images of the earth surface and scheduling the download activities to transmit the image files to a set of ground stations. The scheduling problem is required to be solved every day in a typical 1-day horizon and it must respect complex satellite operational constraints as well as request preferences, such as visibility time windows, transition time between consecutive observations or downloads, memory capacity, energy capacity, polygon target requests and priorities. The objective is to maximize the rewards of the images taken and transmitted. We present a nonlinear model of the scheduling problem, develop a priority-based heuristic with conflict-avoided, limited backtracking and download-as-needed features, which produces satisfactory feasible plans in a very short time. A decision support system based on the model and the heuristic is also provided. The system performance shows a significant improvement with respect to faster and better scheduling of an earth observing satellite constellation.

Pei Wang; Gerhard Reinelt; Peng Gao; Yuejin Tan

2011-01-01T23:59:59.000Z

333

2007 Solar Decathlon Detailed Event Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DETAILED EVENT SCHEDULE DETAILED EVENT SCHEDULE Last updated on September 14, 2007 Note: This schedule is subject to change at any time. 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00

334

APPENDIX A: Forms and Instructions Form Form R93D-44 Form R93D-03  

U.S. Energy Information Administration (EIA) Indexed Site

APPENDIX A: Forms and Instructions APPENDIX A: Forms and Instructions Form Form R93D-44 Form R93D-03 Form R93D-59 Instructions Form RT94-02 Form RT94-04 Form RT94-0! Form RT94-03 Form RT94-05 Form RT94-06 Instructions Form RT94-09 Instructions Form RT94-10 Form RT94-07 Form RT94-08 Form RT94-17 Form RT94-19 Form RT94-24 Form RT94-15 Form RT94-13 Form RT94-22 Form RT94-26 Form RT94-18 Form RT94-20 FormRT94-16 Form RT94-14 Form RT94-21 Form RT94-25 FormRT94-ll Form RT94-12 Form RT94-23 Form RT94-27 Section N (Vehicles) of 1993 RECS Questionnaire ............. Cover Letter for VIN Follow-up ........................... Vehicle Information Card (yellow, front only) ................. 1993 RECS Mail Questionnaire, Pages 4-5 (vehicle pages only) .... Instructions for Assembling RTECS Mid-Year Mailings ..........

335

Module 4Module 4 CPU SchedulingCPU Scheduling Reading: Chapter 5Reading: Chapter 5Reading: Chapter 5Reading: Chapter 5  

E-Print Network [OSTI]

to execute, and then give the control to it If we want efficient resource utilization, we need CPU scheduling preemptive scheduling? DispatcherDispatcher Dispatcher module gives control of the CPU to the process1 Module 4Module 4 ­­ CPU SchedulingCPU Scheduling Reading: Chapter 5Reading: Chapter 5Reading

Stojmenovic, Ivan

336

: A Testbed for Empirically Comparing Real-Time Multiprocessor Schedulers  

E-Print Network [OSTI]

on M processors any pe- riodic task system with total utilization at most M [2], and the global-deadline-first (EDF) scheduling, pre- emptive and nonpreemptive global EDF scheduling, and two variants of the global-real-time constraints. To our knowledge, this paper is the first attempt by anyone to compare partitioned and global

Anderson, James

337

ORIE 6335: THE DESIGN & ANALYSIS OF SCHEDULING ALGORITHMS Spring 2009  

E-Print Network [OSTI]

of algorithms will be very useful. Course Requirements: There will be four to five problem sets; the last one. This course will cover the basic techniques in the design of efficient algorithms for scheduling problemsORIE 6335: THE DESIGN & ANALYSIS OF SCHEDULING ALGORITHMS Spring 2009 Instructor: David Shmoys

Keinan, Alon

338

Polynomial Time Algorithms for Minimum Energy Scheduling Philippe Baptiste1  

E-Print Network [OSTI]

algorithm for computing the minimum energy schedule when all jobs have unit length. 1 Introduction PowerPolynomial Time Algorithms for Minimum Energy Scheduling Philippe Baptiste1 , Marek Chrobak2 policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory

Chrobak, Marek

339

Optimizing Throughput and Energy in Online Deadline Scheduling  

E-Print Network [OSTI]

of all jobs. An optimal schedule is expected to maximize the throughput, and furthermore, its energy a scheduling algorithm, one has to face the dilemma of selecting more jobs and being conservative in energy jobs; O(1)-competitive online algorithms with respect to energy usage have been known [Yao et al. 1995

Wong, Prudence W.H.

340

Physics & Astronomy Open House Schedule UH Manoa Watanabe Hall  

E-Print Network [OSTI]

Physics & Astronomy Open House Schedule UH Manoa Watanabe Hall 22 November 2014 0830 - 1245 *** Physics & Astronomy info. available at www.phys.hawaii.edu *** Welcome & Overview: Prof. Pui Lam in Physical Science 217 at 0830 ** schedules for groups 1 to 10 below for 0900-1100 ** **solar observing

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

A behavior priority driven approach for resource reservation scheduling  

Science Journals Connector (OSTI)

In this paper a behavioral distinction of soft real-time tasks is introduced. The distinction is based on the behavior of the previous instance of each task and it is used to propose a scheduling algorithm. The algorithm, called BIDS, uses well-known ... Keywords: behavior, importance, real-time, scheduling, server

Leo Ordínez; David Donari; Rodrigo Santos

2008-03-01T23:59:59.000Z

342

Coordinated Hospital Patient Scheduling Keith Decker and Jinjiang Li  

E-Print Network [OSTI]

Coordinated Hospital Patient Scheduling Keith Decker and Jinjiang Li Department of Computer and Information Sciences University of Delaware (decker,jli)@cis.udel.edu Abstract Hospital Patient Scheduling is an inherently distributed problem because of the way real hospitals are organized. As medical procedures have

Decker, Keith S.

343

Single Machine Scheduling with a Non-renewable Financial Resource  

E-Print Network [OSTI]

Single Machine Scheduling with a Non-renewable Financial Resource Evgeny R. Gafarov a , Alexander A with a non-renewable resource. For example, money or fuel provide natural examples of such a non-renewable resource. Such problems with a non-renewable resource are also referred to as financial scheduling problems

Magdeburg, Universität

344

Incentivizing Advanced Load Scheduling in Smart Homes , and David Irwin  

E-Print Network [OSTI]

Incentivizing Advanced Load Scheduling in Smart Homes Ye Xu , and David Irwin , and Prashant Shenoy Department of Electrical and Computer Engineering School of Computer Science University of Massachusetts Amherst ABSTRACT In recent years, researchers have proposed numerous advanced load scheduling algorithms

Massachusetts at Amherst, University of

345

Iterative improvement to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

This paper presents iterative improvement algorithms to solve the parcel hub scheduling problem (PHSP). The PHSP is combinatorial optimization problem that consists of scheduling a set of inbound trailers to a small number of unload docks. At the unload ... Keywords: Cross docks, Genetic algorithms, Local search, Parcel delivery industry, Simulated annealing

Douglas L. McWilliams

2010-08-01T23:59:59.000Z

346

POWER SCHEDULING IN A HYDROTHERMAL SYSTEM UNDER UNCERTAINTY  

E-Print Network [OSTI]

de­ composition. Numerical results are re­ ported for realistic data from a German power utility. Keywords: Power scheduling, uncertain elec­ trical load, stochastic Lagrangian decomposi­ tion, scenarioPOWER SCHEDULING IN A HYDRO­THERMAL SYSTEM UNDER UNCERTAINTY C.C. Carøe 1 , M.P. Nowak 2 , W. R

Römisch, Werner

347

A Meeting Scheduling System Based on Open Constraint Programming  

E-Print Network [OSTI]

- ences can be programmed using the OCP reactors language. CLP is suitable to be used in meetingA Meeting Scheduling System Based on Open Constraint Programming Kenny Qili Zhu and Andrew E a meeting scheduling system based on open constraint programming (OCP) paradigm. OCP is an extension

Zhu, Kenny Q.

348

Queue Prediction: an efficient scheduler for fast ATM cell transmission  

E-Print Network [OSTI]

Queue Prediction: an efficient scheduler for fast ATM cell transmission Peter Fenwick Department, if not impossible within the time constraints of fast ATM transmission (622 Mbps or higher). This paper presents a solution to this problem. By scheduling in advance the transmissions from queues it allows all output

Fenwick, Peter

349

GreenSlot: Scheduling Energy Consumption in Green Datacenters  

E-Print Network [OSTI]

GreenSlot: Scheduling Energy Consumption in Green Datacenters Íñigo Goiri UPC/BSC and Rutgers Univ grid (as a backup). GreenSlot predicts the amount of solar energy that will be available in the near future, and schedules the workload to maximize the green energy consumption while meet- ing the jobs

350

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint  

E-Print Network [OSTI]

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint Zhe Wang Electrical--In this paper, we develop efficient algorithm to obtain the optimal energy schedule for fading channel with energy harvesting. We assume that the side information of both the channel states and energy harvesting

Greenberg, Albert

351

Smooth Inequalities and Equilibrium Inefficiency in Scheduling Games  

E-Print Network [OSTI]

, that permits to bal- ance overall quality of service and fairness. Our goal is to design schedul- ing policies that schedules the jobs non-preemptively in order of increasing processing times. We show that the price on Internet and Network Economics (WINE 2012), Liverpool : United Kingdom (2012)" DOI : 10

Paris-Sud XI, Université de

352

Expanding Your Horizons scheduled for March 2  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expanding Your Horizons Expanding Your Horizons Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Expanding Your Horizons scheduled for March 2 The conference offers fifth- to 12th-grade girls opportunities to participate in hands-on workshops about science, technology, engineering, math and related fields. February 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Up to 250 young women are expected to participate in the workshops that will include subjects such as computers and robots, veterinary medicine, cryptography and ocean science. This year the Santa Fe and Los Alamos Expanding Your Horizons (EYH) conferences are combined into one, all-day session to be held on March 2 at

353

DOE HQ Shuttle Bus Schedule and Route | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is inappropriate and against the law.

354

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

355

SOCO-2-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

356

SOCO-4-E Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

357

HSO SPOTLIGHT No 01 2012 HSO Meeting Schedule for 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings What is the issue? Meeting and Training Schedule Why do we need this? Informational Who is impacted? HSOs What does the HSO need to do? This is an informational Spotlight only NOTICE: The information in all HSO Spotlights applies only at Department of Energy (DOE) Headquarters facilities in the Washington, DC area. They are not intended to apply at DOE field sites, which may have entirely different local procedures. The HSO Program Manager has established the schedule below for quarterly HSO meetings in 2012. Please note that the topics listed are subject to change. HSO Quarterly Meeting and Training Schedule 2011 10:00 to Noon each day FORS Date / Room

358

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule October 1, 2011 - 3:22pm Addthis Availability: This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three phase

359

Department Sets Aggressive Schedule for New Appliance Standards |  

Broader source: Energy.gov (indexed) [DOE]

Sets Aggressive Schedule for New Appliance Standards Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

360

Balancing Authority Cooperation Concepts - Intra-Hour Scheduling  

SciTech Connect (OSTI)

The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

2013-03-29T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Department Sets Aggressive Schedule for New Appliance Standards |  

Broader source: Energy.gov (indexed) [DOE]

Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

362

DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE  

Broader source: Energy.gov (indexed) [DOE]

13 13 DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE N1-434-96-9, N1-434-07-01, and N1-434-08-02 Revision 2 June 2008 Scope. This schedule encompasses research and development (R&D) records generated within the Department of Energy (DOE) complex, which consists of all DOE offices and its contractor organizations, such as the National Laboratories. It applies to all applicable records regardless of media or format, including paper, audio and visual, and electronic records. Excluded from this schedule are R&D records pertaining to (a) nuclear weapons, which are covered by DOE Nuclear Weapons Schedule (NI-434-96-5 and N1-434-98- 27), and (b) Work for Others, Cooperative Research and Development Agreements (CRADA), and cost sharing agreements, which are covered by DOE Schedule N1-434-

363

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

364

Rate Schedule CV-T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

T3 T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) firm and/or non-firm Point-to-Point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

365

Achieving Queue-Length Stability Through Maximal Scheduling in Wireless Networks  

E-Print Network [OSTI]

stability region; however, these scheduling strategies also require centralized control. Although [5], [6Achieving Queue-Length Stability Through Maximal Scheduling in Wireless Networks Prasanna Chaporkar through distributed scheduling in wireless networks. We consider a simple, local information based

Sarkar, Saswati

366

Power Control and Transmission Scheduling for Network Utility Maximization in Wireless Networks  

E-Print Network [OSTI]

Power Control and Transmission Scheduling for Network Utility Maximization in Wireless Networks Min power control and transmis- sion scheduling problem in wireless networks with average power constraints. Index Terms--Network utility maximization, power control, transmission scheduling, column generation I

Sharma, Vinod

367

On Dynamic Scheduling of a Parallel Server System with Partial Pooling  

E-Print Network [OSTI]

proposed and refined by Harrison et al., we approximate the scheduling control problem for this parallel Scheduling of Parallel Servers. Keywords and phrases: Stochastic networks, dynamic control, resource pooling.3 Scheduling Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 3 Sequence

368

Maximising the net present value for resource-constrained project scheduling  

Science Journals Connector (OSTI)

The Resource-constrained Project Scheduling Problem (Rcpsp), in which a schedule must obey the resource constraints and the precedence constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of ...

Andreas Schutt; Geoffrey Chu; Peter J. Stuckey; Mark G. Wallace

2012-05-01T23:59:59.000Z

369

E-Print Network 3.0 - action scheduling tool Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Collection: Computer Technologies and Information Sciences 62 DesigntoCriteria Scheduling: RealTime Agent Control ? Summary: or the Design-to-Criteria scheduler. The...

370

E-Print Network 3.0 - altered fractionation schedules Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sciences 18 Scheduling Space-Ground Communications for the Air Force Satellite Control Network Summary: Scheduling Space-Ground Communications for the Air Force...

371

E-Print Network 3.0 - appointments and schedules Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

students are required to schedule routine appoint-ments with their respective academic advisor. Summary: All EOFPEPCARR students are required to schedule routine appoint- ments...

372

E-Print Network 3.0 - aware packet scheduling Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

packets. Through simulation we show the improved performance of our scheduling algorithm... Flow N Scheduler Queues CPU Handler Packets Leaving Active Node Packets Entering...

373

PARS II End-of-Month Checklist and Processing Schedule | Department...  

Energy Savers [EERE]

and Processing Schedule PARS II End-of-Month Checklist and Processing Schedule Slide 1 More Documents & Publications Slide 1 PMCDPNewsletterOctober2010SHR.pdf October...

374

Mixed integer model for optimizing equipment scheduling and overburden transport in a surface coal mining operation  

SciTech Connect (OSTI)

The lack of available techniques prompted the development of a mixed integer model to optimize the scheduling of equipment and the distribution of overburden in a typical mountaintop removal operation. Using this format, a (0-1) integer model and transportation model were constructed to determine the optimal equipment schedule and optimal overburden distribution, respectively. To solve this mixed integer program, the model was partitioned into its binary and real-valued components. Each problem was successively solved and their values added to form estimates of the value of the mixed integer program. Optimal convergence was indicated when the difference between two successive estimates satisfied some pre-specific accuracy value. The performance of the mixed integer model was tested against actual field data to determine its practical applications. To provide the necessary input information, production data was obtained from a single seam, mountaintop removal operation located in the Appalachian coal field. As a means of analyzing the resultant equipment schedule, the total idle time was calculated for each machine type and each lift location. Also, the final overburden assignments were analyzed by determining the distribution of spoil material for various overburden removal productivities. Subsequent validation of the mixed integer model was conducted in two distinct areas. The first dealt with changes in algorithmic data and their effects on the optimality of the model. The second area concerned variations in problem structure, specifically those dealing with changes in problem size and other user-inputed values such as equipment productivities or required reclamation.

Goodman, G.V.R.

1987-01-01T23:59:59.000Z

375

2014 Electricity Form Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

electricity data collection in 2014 via the following survey forms: Form EIA-63B, "Annual Photovoltaic CellModule Shipments Report" Form EIA-411, "Coordinated Bulk Power Supply...

376

ARRT Courses & Schedule | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ARRT Courses & Schedule ARRT Courses & Schedule ARRT Courses & Schedule Advanced Radiological Response Techniques (ARRT) Courses The ARRT series, developed by the Defense Nuclear Weapons School, was designed specifically for the National Guard Bureau's Weapons of Mass Destruction's Civil Support Teams. The course, however, is open to other agencies that may have radiological response missions. Scenario-driven exercises cover everything from radiation fundamentals and material detection to handling and safely containing nuclear materials. The ARRT series can be used as either initial training or a refresher for attendees. Topics include the following: Consequence Management Contaminated Casualty Extraction Contamination Control Decontamination Hotline Operations Material Packaging

377

HS663(b) Pre-purchase form for hazardous materials Version 4: 19/03/2013 Reference HS316: Purchasing Guidelines  

E-Print Network [OSTI]

segregated storage area and if yes, is one available? Is a safe method available to transport the chemical guideline Is the chemical a Schedule 4 or Schedule 8 Drug. Some S4s and all S8s require additional: Purchasing Guidelines This form can be used to assist consider the risks of introducing new hazardous

New South Wales, University of

378

FINAL SCHEDULE FOR CHIEF OF STAFF  

Broader source: Energy.gov (indexed) [DOE]

Wednesday, July 11, 2001 Wednesday, July 11, 2001 10:00 AM PROGRAM DIRECTOR'S MEETING 10:30 AM Secretary's Conference Room Lead & Attending Staff: McSlarrow Attending Staff: McMonigle and Dandy Attendees: ESA2; ESA3 10:30 AM MEETING W/CHUCK DOMINY (HALLIBURTON 11:00 AM COMPANY) McSlarrow's Office Jim Andrews 11:45 AM DEPART EN ROUTE TO PLAZA 12:00 PM LUNCH MEETING 1:30 PM American Grill - Loew's Plaza 1:30 PM DEPART EN ROUTE TO DOE 2:00 PM ELECTRICITY ADVISORY BOARD 2:30 PM TBD 4:30 PM (T) MEETING W/GREG RENKES 5:00 PM McSlarrow's Office Page 13 (3/22/2002. 4:54 PM) Internal Distribution 26076 FINAL SCHEDULE FOR CHIEF OF STAFF Thursday, July 12, 2001 8:45 AM MEETING W/JEFF LAWRENCE & MICHAEL CROWE 9:00 AM (PROVOST/UNIV. OF COLUMBIA) McSlarrow's Office 10:00 AM DEFENSE MEETING 10:30 AM Secretary's Office

379

400A Construction Schedule | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

27-ID and 35-ID 27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID Past Construction Past 27-ID and 35-ID Construction Day Activity Impact Week of 06.11.13 35-ID-D panels arrive, 35-ID-C panel installation complete. Start installation of 35-ID-D. -/- Week of 06.13.13 DCS/RIXS Construction Progress Meeting, LOM 438-C010, 9AM -/- Week of 06.18.13 27-ID-A panels arrive -/- Week of 06.25.13 first shipment of 35-ID-E panels arrives -/- Week of 06.03.13 continue installation of 35-ID-C panels, doors, roof and floor trim Low Week of 05.20.13 35-ID-C panels arrive begin installation of 35-ID-C wall and roof panels Low Week of 05.13.13 completion of 35-ID-B roof panels, installation of lead trim, steel capping and door installation. Low Tuesday - 03.05.13

380

Polynomial Time Algorithms for Minimum Energy Scheduling  

E-Print Network [OSTI]

The aim of power management policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory level of performance. One common method for saving energy is to simply suspend the system during the idle times. No energy is consumed in the suspend mode. However, the process of waking up the system itself requires a certain fixed amount of energy, and thus suspending the system is beneficial only if the idle time is long enough to compensate for this additional energy expenditure. In the specific problem studied in the paper, we have a set of jobs with release times and deadlines that need to be executed on a single processor. Preemptions are allowed. The processor requires energy L to be woken up and, when it is on, it uses one unit of energy per one unit of time. It has been an open problem whether a schedule minimizing the overall energy consumption can be computed in polynomial time. We solve this problem in positive, by providing an O(n^5)-time algorithm. In addition we pr...

Baptiste, Philippe; Durr, Christoph

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE Announces Yucca Mountain License Application Schedule | Department of  

Broader source: Energy.gov (indexed) [DOE]

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

382

Potomac River Project Outage Schedule Clarification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

383

Potomac River Project Outage Schedule Clarification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

384

DOE Surpasses Cleanup Target Ahead of Schedule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Surpasses Cleanup Target Ahead of Schedule Surpasses Cleanup Target Ahead of Schedule DOE Surpasses Cleanup Target Ahead of Schedule May 12, 2011 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by approximately 90 percent by 2015. Footprint reduction lowers costs associated with site surveillance and maintenance and helps protect the

385

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment  

Broader source: Energy.gov (indexed) [DOE]

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs May 12, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by

386

Proposal Submittal and Scheduling Procedures for Research | Stanford  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Submittal and Scheduling Procedures for Research Proposal Submittal and Scheduling Procedures for Research New Proposals Standard GU Proposals Instructions for New Standard Proposals (Not LOI or Rapid Access) Tips for How to Wow Rapid Access Letter of Intent (LOI) Proposal Extension Requests X-ray/VUV Macromolecular Crystallography Beam Time Allocation/Scheduling How to Request Beam Time SSRL Access Policy SSRL Schedules New Proposals SSRL operates as a dedicated synchrotron radiation source for approximately nine months per year (usually from early November through early August). Submitting a proposal is the first step to access beam time at SSRL. SSRL scientists are available to help answer questions about the accelerator (SPEAR3), beam lines, capabilities, science or techniques to help users plan their experiments and their SSRL proposals.

387

SSRL Experimental Run Schedule | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experimental Run Schedule Experimental Run Schedule SLAC National Accelerator Laboratory will be closed for the winter holidays, December 21, 2013 through January 5, 2014. SSRL generally operates November through August, using the shutdown period for upgrades and maintenance projects. SSRL operates at 500mA and employs a frequent fill schedule to maintain the SPEAR3 current approximately constant. Automatic injections will be conducted every 5 minutes. Automatic injections will only occur at the designated 5 minute intervals (i.e., on the hour and every 5 minutes thereafter). If the injector is not functional at the designated fill time, then the fill will be skipped. The current will be replenished at the next scheduled fill time after the injector is repaired and normal injection intervals will resume. The operator will give

388

Omega Laser Facility Schedule - Laboratory for Laser Energetics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Schedule - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE LLE...

389

Optimal Coordination Mechanisms for Multi-job Scheduling Games  

Science Journals Connector (OSTI)

We consider the unrelated machine scheduling game in which players control subsets of jobs. Each player’s objective is to minimize the weighted sum of completion time of her jobs, while the social cost is the ...

Fidaa Abed; José R. Correa; Chien-Chung Huang

2014-01-01T23:59:59.000Z

390

Gain scheduling for geometrically nonlinear flexible space structures  

E-Print Network [OSTI]

A gain-scheduling approach for the control of geometrically nonlinear structures is developed. The objective is to improve performance over current linear design techniques that are applied to the same control problem. The ...

Yung, Jeremy Hoyt, 1971-

2002-01-01T23:59:59.000Z

391

Time and event triggered communication scheduling for automotive applications  

E-Print Network [OSTI]

automotive electronics applications by a number of European car and heavy truck manufacturers systems within automotive electronics applications by a number of European car and heavy truckTime and event triggered communication scheduling for automotive applications ROGER JOHANSSON

Johansson, Roger

392

A hybrid bin-packing heuristic to multiprocessor scheduling  

E-Print Network [OSTI]

A hybrid bin-packing heuristic to multiprocessor scheduling. Adriana Alvim (alvim ***at*** inf.puc-rio.br) Celso Ribeiro (celso ***at*** inf.puc-rio.br). Abstract: The ...

Adriana Alvim

393

Integration of process planning and scheduling— a review  

Science Journals Connector (OSTI)

In recent years, a few researchers have addressed the need for the integration of process planning and scheduling functions in order to achieve ... that the potential savings are substantial when process planning

Wei Tan; Behrokh Khoshnevis

2000-02-01T23:59:59.000Z

394

Optimal Design and Scheduling of Unsteady State Material Recovery Networks  

E-Print Network [OSTI]

methodologies: the first is a hierarchical multi-step methodology developed for the design and scheduling of batch water (material of interest) recycle networks. A new source- double tank-sink arrangement is introduced to overcome the limitation of samecycle...

Rabie, Arwa H.

2010-01-14T23:59:59.000Z

395

Argonne Training Program on Extreme-Scale Computing Scheduled...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10-petaflops supercomputer ushers in a new scientific era at the ALCF. Argonne Training Program on Extreme-Scale Computing Scheduled for August 2-14, 2015 Author: Brian...

396

University at Buffalo (SUNY) Department of Industrial Engineering Scheduling Theory  

E-Print Network [OSTI]

University at Buffalo (SUNY) Department of Industrial Engineering IE 661 Scheduling Theory Chapter 2 Rakesh Nagi Department of Industrial Engineering University at Buffalo (SUNY) #12;University at Buffalo (SUNY) Department of Industrial Engineering Chapter 2: Deterministic Models Preliminaries

Nagi, Rakesh

397

Optimal Preemptive Scheduling for General Target Functions Leah Epstein  

E-Print Network [OSTI]

on a machine of speed s, its processing time will be w/s. A non- preemptive schedule of the jobs. This case was studied in [11, 10, 6, 12]. Liu and Y

Beimel, Amos

398

Planning and scheduling proximity operations for autonomous orbital rendezvous  

E-Print Network [OSTI]

This thesis develops a mixed integer programming formulation to solve the proximity operations scheduling problem for autonomous orbital rendezvous. The algorithm of this thesis allows the operator to specify planned modes, ...

Guerra, Christopher J., 1978-

2003-01-01T23:59:59.000Z

399

Dynamic Scheduling of Skippable Periodic Tasks: Issues and Proposals  

E-Print Network [OSTI]

-Chetto and Audrey Marchand IRCCyN, University of Nantes, Nantes, FRANCE Email: {maryline.chetto, audrey.marchand Scheduling of Skippable Periodic Tasks in Weakly-Hard Real-Time Systems," by M. Silly-Chetto, and A. Marchand

Paris-Sud XI, Université de

400

Analytic framework for TRL-based cost and schedule models  

E-Print Network [OSTI]

Many government agencies have adopted the Technology Readiness Level (TRL) scale to help improve technology development management under ever increasing cost, schedule, and complexity constraints. Many TRL-based cost and ...

El-Khoury, Bernard

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Scheduling screening inspections for replaceable and non-replaceable systems  

E-Print Network [OSTI]

This dissertation focuses on developing inspection schedules to detect non-self- announcing events which can only detected by inspections. Failures of protective sys- tems ,such as electronic equipments, alarms and stand-by systems, incipient...

Aral, Bahadir

2009-05-15T23:59:59.000Z

402

An integrated cost model for production scheduling and perfect maintenance  

Science Journals Connector (OSTI)

Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.

Laith A. Hadidi; Umar M. Al-Turki; M. Abdur Rahim

2011-01-01T23:59:59.000Z

403

Scheduling the Tasks of Two Agents with a Central Selection ...  

E-Print Network [OSTI]

performance measure which only depends on its tasks completion times. ..... schedules ?1,?2 in D. Let k be the largest index of a doubleton such that Dk is ...

2014-06-16T23:59:59.000Z

404

Thread Scheduling Mechanisms for Multiple-Context Parallel Processors  

E-Print Network [OSTI]

Scheduling tasks to efficiently use the available processor resources is crucial to minimizing the runtime of applications on shared-memory parallel processors. One factor that contributes to poor processor utilization ...

Fiske, James A. Stuart

1995-06-01T23:59:59.000Z

405

Underground Injection Control Fee Schedule (West Virginia) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Injection Control Fee Schedule (West Virginia) Injection Control Fee Schedule (West Virginia) Underground Injection Control Fee Schedule (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Provider Department of Environmental Protection This rule establishes schedules of permit fees for state under-ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is required to apply for and

406

Forensic Management Academy Spring 2011 Tentative Schedule Forensic Management Academy  

E-Print Network [OSTI]

Forensic Management Academy ­ Spring 2011 Tentative Schedule Forensic Management Academy Spring:00 Tour Forensic Program Facilities 4:30 ­ 7:30 Session VIII Conflict Management Joyce Heames7:00 Free

Mohaghegh, Shahab

407

Scheduling Flexible Maintenance Activities subject to Job ...  

E-Print Network [OSTI]

Apr 3, 2010 ... We consider a transition form state i to state j if and only if itransition costs ci,j are ...... Management Science, 15(1):102–109, 1968.

2010-04-14T23:59:59.000Z

408

A study of enhancements to rate monotone scheduling  

E-Print Network [OSTI]

A STUDY OF ENHANCEMENTS TO RATE MONOTONE SCHEDULING A Thesis by RADHIKA KOZHIKODAKATHA VEETIL MENON Submitted to the Office of Graduate Studies of Texas AIsM University in partial fulfillment of the requirements for the degree of MASTER...A STUDY OF ENHANCEMENTS TO RATE MONOTONE SCHEDULING A Thesis by RADHIKA KOZHIKODAKATHA VEETIL MENON Submitted to the Office of Graduate Studies of Texas AIsM University in partial fulfillment of the requirements for the degree of MASTER...

Menon, Radhika Kozhikodakatha Veetil

2012-06-07T23:59:59.000Z

409

An algorithm for scheduling a large pumped storage plant  

SciTech Connect (OSTI)

The Michigan Electric Coordination Center (MEPCC), operated by Consumers Power and Detroit Edison Companies, has the responsibility for scheduling the Ludington pumped storage plant. Ludington has an extremely large economic effect on the Consumers Power and Detroit Edison Companies' system due to its size (over 1800 MW net demonstrated generating capability). This paper presents a dynamic programming algorithm for scheduling large pumped storage plants and shows how this method can be coordinated with the commitment of the thermal units of the system.

Cohen, A.I.; Wan, S.H.

1985-08-01T23:59:59.000Z

410

A computer algorithm to optimize the scheduling of strategic sealift  

E-Print Network [OSTI]

A COMPUTER ALGORITHM TO OPTIMIZE THE SCHEDULING OF STRATEGIC SEALIFT A Thesis by GARRETT RANDALL LAMBERT Submitted to the OI5ce of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE May 1995 Major Subject: Industrial Engineering A COMPUTER ALGORITHM TO OPTIMIZE THE SCHEDULING OF STRATEGIC SEALIFT A Thesis by GARRETT RANDALL LAMBERT Submitted to Texas A&M University in partial fulfillment of the requirements...

Lambert, Garrett Randall

1995-01-01T23:59:59.000Z

411

Multi-site Scheduling with Fuzzy Concepts Jrgen Sauer, Gerd Suelmann, and Hans-Jrgen Appelrath  

E-Print Network [OSTI]

management, job release, and production control of PPC. In most cases scheduling problems are addressedMulti-site Scheduling with Fuzzy Concepts Jürgen Sauer, Gerd Suelmann, and Hans-Jürgen Appelrath@informatik.uni-oldenburg.de Abstract The objective of multi-site scheduling is to support the scheduling activities of a global

Appelrath, Hans-Jürgen

412

On the Dual Effect in State-Based Scheduling of Networked Control Systems  

E-Print Network [OSTI]

On the Dual Effect in State-Based Scheduling of Networked Control Systems Chithrupa Ramesh, Henrik with state-based scheduling. In general, this makes the optimal scheduler and controller hard to find. However, by removing past controls from the scheduling criterion, we find that certainty equivalence holds

Johansson, Karl Henrik

413

EFFECTS OF SCHEDULING AND SPACING TOOLS ON CONTROLLERS' PERFORMANCE AND PERCEPTIONS OF THEIR WORKLOAD  

E-Print Network [OSTI]

EFFECTS OF SCHEDULING AND SPACING TOOLS ON CONTROLLERS' PERFORMANCE AND PERCEPTIONS areas. The efficient scheduling and control of aircraft from cruise to touchdown during congested the utility of air traffic control (ATC) scheduling but the theoretical advantage of a precision scheduling

414

Evaluation of Design Choices for Gang Scheduling using Distributed Hierarchical Control  

E-Print Network [OSTI]

Evaluation of Design Choices for Gang Scheduling using Distributed Hierarchical Control Dror G to control the adverse e ect of badly-matched gangs. Consequently the on-line mapping and scheduling, Israel Abstract Gang scheduling | the scheduling of a number of related threads to execute simultaneously

Feitelson, Dror

415

A beam search heuristics to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

In this paper, a beam search scheduling heuristic (BSSH) is presented to solve the parcel hub scheduling problem (PHSP), which is a scheduling problem that is common in the parcel delivery industry (PDI). Companies in the PDI include the United States ... Keywords: Beam search, Cross docking, Parcel delivery, Scheduling, Transportation

Douglas L. McWilliams; Maranda E. McBride

2012-05-01T23:59:59.000Z

416

The parcel hub scheduling problem: A simulation-based solution approach  

Science Journals Connector (OSTI)

This research presents an interesting scheduling problem common to freight consolidation terminals. This previously unstudied problem involves scheduling a set of inbound trailers to a fixed number of unload docks. The objective is to schedule the trailers ... Keywords: Consolidation terminals, Genetic algorithms, Hub scheduling, Simulation

Douglas L. McWilliams; Paul M. Stanfield; Christopher D. Geiger

2005-11-01T23:59:59.000Z

417

Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule  

Broader source: Energy.gov [DOE]

Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

418

Microgrid Reliability Modeling and Battery Scheduling Using Stochastic  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability Modeling and Battery Scheduling Using Stochastic Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming Title Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-6309E Year of Publication 2013 Authors Cardoso, Gonçalo, Michael Stadler, Afzal S. Siddiqui, Chris Marnay, Nicholas DeForest, Ana Barbosa-Póvoa, and Paulo Ferrão Journal Journal of Electric Power Systems Research Volume 103 Pagination 61-69 Date Published 06/2013 Abstract This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6%.

419

Meeting security and user behavior requirements in Grid scheduling  

Science Journals Connector (OSTI)

Most of current research in Grid computing is still focused on the improvement of the performance of Grid schedulers. However, unlike traditional scheduling, in Grid systems there are other important requirements to be taken into account. One such a requirement is the secure scheduling, namely achieving an efficient allocation of tasks to reasonable trustful resources. In this paper we formalize the Grid scheduling problem as a non-cooperative non-zero sum game of the Grid users in order to address the security requirements. The premise of this model is that in a large-scale Grid, the cooperation among all users in the system is unlikely to happen. The users’ cost of playing the game is interpreted as a total cost of the secure job execution in Grid. The game cost function is minimized, at global (Grid) and local (users) levels, by using four genetic-based hybrid meta-heuristics. We have evaluated the proposed model under the heterogeneity, the large-scale and dynamics conditions using a Grid simulator. The relative performance of four hybrid schedulers is measured by the makespan and flowtime metrics. The obtained results suggested that it is more resilient for the Grid users to pay some additional scheduling cost, due to verification of the security conditions, instead of taking the risk of assigning their tasks to unreliable resources.

Joanna Ko?odziej; Fatos Xhafa

2011-01-01T23:59:59.000Z

420

Ancillary-service details: Dynamic scheduling  

SciTech Connect (OSTI)

Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

Hirst, E.; Kirby, B.

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

OCPR Forms | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Prevention and Resulution (OCPR) Forms Request for Mediation Intake Form Technology Transfer Reporting Form Mediation Survey Form Form Instructions: Fill out the form and...

422

Forms | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forms Forms Forms DOE Forms are developed within the Department, and approved by the DOE Forms Manager. These forms are designed to obtain or provide structured information common to the needs of two or more DOE field or Headquarters organizations. All of the forms here are in Portable Document Format (PDF). Adobe Acrobat(R) Reader is needed to view and print the PDF files. Fillable forms, identified by the "fillable" icon, require a full version of Adobe Acrobat software. DOE Forms Forms by Subject Forms by Number Management & Administration 0000 - 1999 Legal 2000 - 2999 Personnel Management 3000 - 3999 Logistic Management 4000 - 4999 Program Planning & Management 5000 - 5999 HQ Forms HQ Forms are developed or managed by a Headquarters organization, and

423

Robust scheduling of smart appliances with uncertain electricity prices in a heterogeneous population  

Science Journals Connector (OSTI)

Abstract Majority of the research conducted in the field of optimal scheduling of smart appliances does not consider the inherent uncertainties in this problem. Besides, the ones that count for the uncertainty usually assume full knowledge about the exact form of the probability distribution of the uncertain parameters. This assumption is hardly fulfilled in reality. In this paper, we seek to find solutions that are robust with respect to the probability distribution of the uncertain parameters while making no explicit assumptions about their exact forms. Accordingly, we define a chance-constrained model to find the optimal schedule and use robust optimization to characterize its solution and the associated uncertain parameters. We also consider the effect of heterogeneous populations on the optimal solution while simultaneously determining the most appropriate classification for accurate predictions. In the process, we investigate the effect of delays in information sharing on computed optimal conditions and we develop a new classification for in-house appliances. We explore features of our model using price data from the “Olympic Peninsula” project. We anticipate that by pursuing optimal options, a typical customer can save up to 33% in her electricity bills while sacrificing 19% of her comfort level. Moreover, in a heterogeneous population, while the results suggest no direct dependency between savings and income level, a meaningful correlation is detected between savings and employment status.

Nastaran Bassamzadeh; Roger Ghanem; Shuai Lu; Seyed Jalal Kazemitabar

2014-01-01T23:59:59.000Z

424

Forms | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forms Forms The following interactive Web-based forms in Adobe Acrobat Portable Document Format (PDF) are designed for online completion with Acrobat Reader 3.0 or above. Input...

425

Empirical Tracking and Analysis of the Dynamics in Activity Scheduling and Schedule Execution  

E-Print Network [OSTI]

the form. Device responds: “stop listening. ” 4.3 Systemwake up! ” Device says: “ready for listening. ” Survey

Zhou, Jianyu Jack

2006-01-01T23:59:59.000Z

426

Notes, definitions and links Schedule J: http://www.admin.cam.ac.uk/univ/so/ follow link first to Schedules then to Schedule J.  

E-Print Network [OSTI]

, Cambridge CB3 0FD APPLICATION FOR A GRANT FROM THE UNIVERSITY TRAVEL FUND ­ COMPUTER LABORATORY ALLOCATION Grants are available only to Schedule J University Officers in the Computer Laboratory. The upper limits is that of the letter/e-mail of notification of a grant). Notification of a grant will not normally be made more than

Haddadi, Hamed

427

TOBUREN, MARK CHRISTOPHER. Power Analysis and Instruction Schedul-ing for Reduced di/dt in the Execution Core of High-Performance Microprocessors.  

E-Print Network [OSTI]

to a processor's average peak power dissipation is the pres- ence of high di=dt in its execution core. High-energy-cycle energy constraints. This thesis proposes a novel approach to instruction scheduling based on the con- cept of schedule slack, which builds energy e cient schedules by limiting the energy dissipated

Conte, Thomas M.

428

RMOTC - Library - Example Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Example Forms RMOTC will make every effort to provide the most current and correct information available. Please be aware that example forms are provided for informational purposes...

429

Integrated network design and scheduling problems : optimization algorithms and applications.  

SciTech Connect (OSTI)

We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

Nurre, Sarah G.; Carlson, Jeffrey J.

2014-01-01T23:59:59.000Z

430

SRS - Retiree Benefits - Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Forms Forms Medical Forms Return completed forms to: 5-200 Health Care Programs Enrollment Change Benefits Solutions Service Center Bldg 703-47A, Aiken, SC 29808 5-340 Medical Claim Form Claims Processing Center P.O. Box 100300, Columbia, SC 29202 -- Pharmacy Claim Form Caremark Prescription Drug Claim Processing Center, P.O. Box 52059, Phoenix, AZ 85072-2059 Dental Forms Return completed forms to: 5-200 Health Care Programs Enrollment Change Benefits Solutions Service Center Bldg 703-47A, Aiken, SC 29808 5-342 Dental Claim Form Claims Processing Center P.O. Box 100300, Columbia, SC 29202 Life Insurance Return completed forms to: 5-171 Contributory Group Life Application and Deduction Authorization Benefits Solutions Service Center Bldg 703-47A, Aiken, SC 29808

431

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

432

Topic Index to the DOE Administrative Records Disposition Schedules  

Broader source: Energy.gov (indexed) [DOE]

5/21/07 TOPICINDEXTODOEADMINSCHEDULES 5/21/07 TOPICINDEXTODOEADMINSCHEDULES Topic Index to the DOE Administrative Records Disposition Schedules (excluding the GRS Schedules) Topic Schedule Item [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [X] [Y] [Z] A Academic/Outreach Program 1 44 Access Request Files 18 6 Accountable Officers' Files 6 1 Accounting Administrative Files 6 5 Administrative Claims Files 6 10 Administrative Training Records 1 29.2 Administrative Issuances 16 1 Administrative - All Other copies of Administrative Issuances 16 1.6 Administrative Grievance, Disciplinary, and Adverse Action Files 1 30 Americans with Disabilities Act 1 42 Apprenticeship Program Files 1 45 Architectural Models 17 7

433

High Explosives Pressing Facility on budget and on schedule | National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Explosives Pressing Facility on budget and on schedule | National Explosives Pressing Facility on budget and on schedule | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > High Explosives Pressing Facility on budget and ... High Explosives Pressing Facility on budget and on schedule Posted By Office of Public Affairs Construction crews prepare to pour concrete at the new High Explosives

434

High Explosives Pressing Facility on budget and on schedule | National  

National Nuclear Security Administration (NNSA)

Pressing Facility on budget and on schedule | National Pressing Facility on budget and on schedule | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > High Explosives Pressing Facility on budget and ... High Explosives Pressing Facility on budget and on schedule Posted By Office of Public Affairs Construction crews prepare to pour concrete at the new High Explosives

435

ARM Mobile Facility - Design and Schedule for Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mobile Facility - Design and Schedule for Integration Mobile Facility - Design and Schedule for Integration K. B. Widener Pacific Northwest National Laboratory Richland, Washington Abstract The Atmospheric Radiation Measurement (ARM) Program has a need for an ARM Mobile Facility (AMF) that can be deployed anywhere in the world for up to 12 months at a time. This system shall be modular so that it can meet the needs of ARM science objectives of each individual deployment. The design phase for developing the AMF has begun. A design review was held for the AMF in December 2002. The design of the shelters, instrumentation, and data system along with the schedule for integration will be presented. Introduction Early in the development of the ARM Program, the need to be able to make atmospheric measurements

436

ARRT-2 Course Schedule | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nuclear and Radiological Nuclear and Radiological Field Training Center / ARRT Courses & Schedule / ARRT-2 Course Schedule ARRT-2 Course Schedule The Y-12 Nuclear and Radiological Field Training Center began offering the ARRT-2 course starting in FY 2011. Class dates and points of contact are listed below. Please feel free to contact NRFTC with any questions or concerns you may have. Upcoming ARRT-2 Class Dates Class Date Registration Cut-off Date 12-15 September 24-28, 2012 September 4, 2012 13-01 January 7-10, 2013 December 7, 2012 13-02 February 4-7, 2013 January 4, 2013 13-03 February 18-21, 2013 January 18, 2013 13-04 March 4-7, 2013 February 4, 2013 13-05 March 18-21, 2013 February 18, 2013 13-06 April 1-4, 2013 March 1, 2013 13-07 April 15-18, 2013 March 15, 2013

437

The Case for Feedback Control RealTime Scheduling John A. Stankovic, Chenyang Lu, Sang H. Son and Gang Tao*  

E-Print Network [OSTI]

The Case for Feedback Control Real­Time Scheduling John A. Stankovic, Chenyang Lu, Sang H. Son dynamic systems. In this paper, we present a new scheduling paradigm, which we call feedback control real­time scheduling. Feedback control real­time scheduling defines error terms for schedules, monitors the error

Son, Sang H.

438

Form:SampleForm | Open Energy Information  

Open Energy Info (EERE)

SampleForm Jump to: navigation, search Input the name of a Test Page below. If the resource already exists, you will be able to edit its information. AddEdit a Test Page The text...

439

C:\MYDOCS\CBECS-FORM\CBECSFRM\EDSMTRY.pdf  

U.S. Energy Information Administration (EIA) Indexed Site

B (8/12/97) B (8/12/97) Form Approval Electricity DSM Program Participation OMB No: 1905-0145 Expires: July 31, 1998 Label COMMERCIAL BUILDINGS ENERGY CONSUMPTION SURVEY FOR 1995 SCHEDULE B ) ) BUILDING ELECTRICITY DSM PROGRAM PARTICIPATION FORM Demand-Side Management (DSM) program participation data are to be provided for the accounts in the building identified on the label. Data may be submitted directly on the reporting form, or in any other format, such as a computer-generated listing, which provides the same information and is convenient for your company. Whatever format is used to submit data, answers to all questions on this form must be included with the submission. For additional information on how to complete the form, see the separate instructions. 1) Does any account in this building have any of the following special electric service rates? (MARK ALL THAT APPLY)

440

EIA Electric Power Forms  

Gasoline and Diesel Fuel Update (EIA)

Electric Power Forms Electric Power Forms EIA Electric Power Forms Listing of Publicly Available and Confidential Data EIA's statistical surveys encompass each significant electric supply and demand activity in the United States. Most of the electric power survey forms resulting data elements are published, but respondent confidentiality is required. The chart below shows the data elements for each survey form and how each data element is treated in regard to confidentiality. Data Categories Data collection forms EIA- 411 EIA- 826 EIA- 860 EIA- 860M EIA- 861 EIA- 923 Frame Information Utility identification and iocation -- -- -- -- X -- Plant identification and iocation -- -- -- X -- X Generation and fuel Latitude and longitude -- -- X -- -- --

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Exercise Evaluation Forms  

Broader source: Energy.gov (indexed) [DOE]

Hazardous Materials Hazardous Materials Exercise Evaluation Forms Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-09.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Hazar Hazar Hazar Hazar Hazardous Materials dous Materials dous Materials dous Materials dous Materials Ex Ex Ex Ex Exer er er er ercise Ev cise Ev cise Ev cise Ev cise Evaluation Forms aluation Forms aluation Forms aluation Forms aluation Forms Objective 1: Initial Notification of Response Agencies and Response Personnel ........................................................ 3 Objective 2: Direction and Control .............................................................. 5 Objective 3: Incident Assessment ................................................................ 6

442

Records Schedule-Alaska Power Authority  

Broader source: Energy.gov (indexed) [DOE]

-109 PREVIOUS EDITION NOT USABLE STANDARD FORM SF 1 15 (REV 3-91) -109 PREVIOUS EDITION NOT USABLE STANDARD FORM SF 1 15 (REV 3-91) Prescr~bed by NARA 36 CFR 1228 REQUEST FOR RECORDS DISPOSITION AUTHORITY To NATIONAL ARCIIIVES and RECORDS ADMINISTRATION (NIR) WASHINGTON, DC 20408 1 FROM (Agency or establ~shment) Department o f Energy 2 MAJOR SUBDIVISION Alaska Power Administration 3 MINOR SUBDIVISION 4 NAME OF PERSON WITH WHOM TO CONFER Carol Holmberg JOB NUMBER N1-447-97- 1 DATE RECEIVED .'I+ 46 NOTIFICATION TO AGENCY In accordance ~ 7 t h thc prov~sions of 44 U S C 3303a, the d~spos~tion request, including amendments, is approved except for items that may be marked "dlspos~tion not approved or "withdrawn" In column 10 5 TELEPHONE (907)586-7405 DATE 1 t,- -'?x 6 AGENCY CERTIFICATION I hearby certify that I am author~zed to act for thls agency in matters pertalnlng to the dlpsositi

443

FOIA Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

You are here: DOEID Home > FOIA > FOIA Request Form You are here: DOEID Home > FOIA > FOIA Request Form U.S. Department of Energy Idaho (DOE-ID) Operations Office Electronic FOIA Request Form* To make an Electronic FOIA (E-FOIA) request, please provide the information below. Failure to enter accurate and complete information may render your FOIA request impossible to fulfill. For individuals making a request for personal records under FOIA or the Privacy Act, please fill out the Privacy Act Request Form ( This link opens an 14 kb size Adobe Acrobat File 15 kb), print out the form and have your identity validated by having the form notarized and send the form to DOE-Idaho Privacy Officer, 1955 Freemont Avenue, Mail Stop 1203, Idaho Falls, ID 83405. * Requests submitted under the Privacy Act must be signed and, therefore, cannot be submitted on this form.

444

Introduction to differential forms  

E-Print Network [OSTI]

Dec 8, 2014 ... 6 Green's theorem for a rectangle. 8. 7 2-forms. 8. 8. Exactness in R3 and conservation of energy. 11. 9. “d” of a 2-form and divergence. 12.

2014-12-08T23:59:59.000Z

445

Standard Form 129  

Broader source: Energy.gov [DOE]

Form required to be filled out by companies applying to be added to the U.S. Department of Energy Qualified List of Energy Service Companies. This form must be completed and submitted with the Supplemental Questionnaire and Client Questionnaire.

446

ORSSAB Membership Application Form  

Broader source: Energy.gov [DOE]

Resident interested in joining the Oak Ridge Site Specific Advisory Board should complete and submit the included form.

447

Dynamic Scheduling of a Parallel Server System in Heavy Traffic with Complete Resource Pooling: Asymptotic Optimality of a  

E-Print Network [OSTI]

as the optimal cost in the Brownian control problem. Short title: Dynamic Scheduling of Parallel Servers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 2.3 Scheduling Control and Performance Measures . . . . . . . . . . . . . . . . . . . . . . . . 7Dynamic Scheduling of a Parallel Server System in Heavy Traffic with Complete Resource Pooling

448

Research Support in Hungary Machine scheduling LED public lighting Microsimulation in public transportation Finally Optimization and Operation Research methods for  

E-Print Network [OSTI]

Research Support in Hungary Machine scheduling LED public lighting Microsimulation in public, 2011 Industrial Innovation Problems #12;Research Support in Hungary Machine scheduling LED public Innovation Problems #12;Research Support in Hungary Machine scheduling LED public lighting Microsimulation

Balázs, Bánhelyi

449

PSY 344. Psychology and Culture SDSU Fall 2013 Schedule # 22551  

E-Print Network [OSTI]

PSY 344. Psychology and Culture SDSU ­ Fall 2013 ­ Schedule # 22551 Class Meetings Class Days of the course is to introduce you to the field of cultural psychology. This course will explore how culture influences human thoughts, feelings, and behaviors. The relations between culture and psychology are both

Gallo, Linda C.

450

TRU Waste Management Program cost/schedule optimization analysis  

SciTech Connect (OSTI)

The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementation would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)

Detamore, J.A. (Rockwell International Corp., Albuquerque, NM (United States). Joint Integration Office); Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A. (Stoller (S.M.) Corp., Boulder, CO (United States))

1985-10-01T23:59:59.000Z

451

Periodic Constraint-Based Control Using Dynamic Wireless Sensor Scheduling  

E-Print Network [OSTI]

Periodic Constraint-Based Control Using Dynamic Wireless Sensor Scheduling James Weimer, Jos´e Ara´ujo, Aitor Hernandez and Karl Henrik Johansson Abstract-- Constraint-based control over wireless sensor net- works (WSNs) require control strategies that achieve a desired closed-loop system performance while

Johansson, Karl Henrik

452

A concurrent rule scheduling algorithm for active rules  

Science Journals Connector (OSTI)

The use of rules in a distributed environment creates new challenges for the development of active rule execution models. In particular, since a single event can trigger multiple rules that execute over distributed sources of data, it is important to ... Keywords: Active rules, Concurrent rule execution, Confluence analysis, Rule scheduling algorithm

Ying Jin; Susan D. Urban; Suzanne W. Dietrich

2007-03-01T23:59:59.000Z

453

Maestro: Replica-Aware Map Scheduling for MapReduce  

Science Journals Connector (OSTI)

MapReduce has emerged as a leading programming model for data-intensive computing. Many recent research efforts have focused on improving the performance of the distributed frameworks supporting this model. Many optimizations are network-oriented and ... Keywords: MapReduce, Hadoop, cloud computing, replication, scheduling

Shadi Ibrahim; Hai Jin; Lu Lu; Bingsheng He; Gabriel Antoniu; Song Wu

2012-05-01T23:59:59.000Z

454

Scheduling scientific experiments on the rosetta/philae mission  

Science Journals Connector (OSTI)

The Rosetta/Philae mission was launched in 2004 by the European Space Agency (ESA). It is scheduled to reach the comet 67P/Churyumov-Gerasimenko in 2014 after traveling more than six billion kilometers. The Philae module will then be separated from the ...

Gilles Simonin; Christian Artigues; Emmanuel Hebrard; Pierre Lopez

2012-10-01T23:59:59.000Z

455

Intelligent Train Scheduling on a High-Loaded Railway Network  

E-Print Network [OSTI]

Intelligent Train Scheduling on a High-Loaded Railway Network A. Lova1 , P. Tormos1 , F. Barber2 application to assist planners in adding new trains on a complex railway network. It includes many trains. The application builds the timeta- ble for new trains linking the available time slots to trains to be schedu- led

Salido, Miguel Angel

456

Downlink Traffic Scheduling in Green Vehicular Roadside Infrastructure  

E-Print Network [OSTI]

or prohibitive expense of wired electrical power. In these situations, an alternative to wired power connections D. Todd, George Karakostas and Dongmei Zhao Department of Electrical and Computer Engineering Mc of scheduling for energy efficient road-side infrastructure. In certain scenarios, vehicle locations can

Karakostas, George

457

Visopt ShopFloor System: Integrating Planning into Production Scheduling  

E-Print Network [OSTI]

Visopt ShopFloor System: Integrating Planning into Production Scheduling Roman Barták Charles, the first machine pre-processes the item (3 time units) that is finished in the second machine (additional 3 in parallel and a worker is required (left) or via a serial production when the item is pre- processed

Bartak, Roman

458

Task Scheduling and Voltage Selection for Energy Minimization  

E-Print Network [OSTI]

system con gurations. 1. INTRODUCTION Energy consumption has become a primary concern in today's ICTask Scheduling and Voltage Selection for Energy Minimization Yumin Zhang Synopsys, Inc. 700 East-phase framework that inte- grates task assignment, ordering and voltage selection VS together to minimize energy

Hu, Xiaobo Sharon

459

A sequential GRASP for the therapist routing and scheduling problem  

Science Journals Connector (OSTI)

This paper presents a new model and solution methodology for the problem faced by companies that provide rehabilitative services to clinic and home-bound patients. Given a set of multi-skilled therapists and a group of geographically dispersed patients, ... Keywords: GRASP, Home healthcare, Midterm scheduling, Overtime, Therapist routing, m-TSP

Jonathan F. Bard; Yufen Shao; Ahmad I. Jarrah

2014-04-01T23:59:59.000Z

460

Financial Risk Management in Offshore Oil Infrastructure Planning and Scheduling  

Science Journals Connector (OSTI)

This paper discusses the financial risk management in the planning and scheduling of offshore oil infrastructure. The problem consists of determining the sequence of platforms to build and the wells to drill as well as how to produce these wells over a ...

Ahmed Aseeri; Patrick Gorman; Miguel J. Bagajewicz

2004-04-28T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

University at Buffalo (SUNY) Department of Industrial Engineering Scheduling Theory  

E-Print Network [OSTI]

1 University at Buffalo (SUNY) Department of Industrial Engineering IE 661 Scheduling Theory Course Introduction Rakesh Nagi Department of Industrial Engineering University at Buffalo (SUNY) #12;2 University at Buffalo (SUNY) Department of Industrial Engineering About the course This graduate level course covers

Nagi, Rakesh

462

Online scheduling with preemption or non-completion penalties  

Science Journals Connector (OSTI)

We consider online preemptive scheduling problems where jobs have deadlines and the objective is to maximize the total weight of jobs completed before their deadlines. In the first problem, preemptions are not free but incur a penalty. In the second ... Keywords: Competitive analysis, Immediate decision, Immediate notification, Online algorithms, Preemption penalty

Stanley P. Fung

2014-04-01T23:59:59.000Z

463

An Evaluation of Sequencing Heuristics for Flexible Flowshop Scheduling Problems  

E-Print Network [OSTI]

algorithm; simulated annealing 1. Introduction Production scheduling can be defined as the allocation of available production resources over time to perform a collection of tasks (Baker, 1974). It is an important), rubber (Yanney and Kuo, 1989), photographic film (Tsubone, Ohba, Takamuki, and Miyake, 1993), steel

Magdeburg, Universität

464

Interactive local search for multiple-criteria scheduling  

E-Print Network [OSTI]

-objective scheduling (MOS). In this thesis, local search approaches based on the problem-space-based neighborhood structure are developed for both MAS and MOS. An interactive procedure is also developed to allow the decision-maker (DM) to interactively incorporate his...

Li, Shijun

2012-06-07T23:59:59.000Z

465

Test Access Mechanism Optimization, Test Scheduling, and Tester Data Volume  

E-Print Network [OSTI]

Test Access Mechanism Optimization, Test Scheduling, and Tester Data Volume Reduction for System Marinissen, Senior Member, IEEE Abstract--We describe an integrated framework for system-on-chip (SOC) test automation. Our framework is based on a new test access mechanism (TAM) architecture consisting of flexible

Chakrabarty, Krishnendu

466

Truck scheduling at zero-inventory cross docking terminals  

Science Journals Connector (OSTI)

Handling freight at cross docking terminals constitutes a complex planning task which comprises several executive steps as shipments delivered by inbound trucks are to be unloaded, sorted according to their designated destinations, moved across the dock ... Keywords: Cross docking, Dynamic programming, Food industry, Logistics, Truck scheduling

Nils Boysen

2010-01-01T23:59:59.000Z

467

Using Heuristic Algorithms to Effectively Schedule Database Utilities*  

E-Print Network [OSTI]

1 Using Heuristic Algorithms to Effectively Schedule Database Utilities* Zusheng Xu and Patrick systems (DBMSs). Data maintenance utilities ensure that the data in tables are stored as efficiently as possible so executing the utilities is crucial to preventing applications from suffering major performance

468

Improved Multi-processor Scheduling for Flow Time and Energy  

E-Print Network [OSTI]

good "quality of service" (QoS) and conserving energy. One commonly used QoS measurement for scheduling between 0 and , and incurs an energy of s per unit time when running at speed s, where 2 (typically 2 not admit any constant competitive online algorithm even if jobs are of unit size [7]. Flow time and energy

Wong, Prudence W.H.

469

Simultaneous Scheduling and Control of Multiproduct Continuous Parallel Lines  

E-Print Network [OSTI]

continuous reactors is cast as a Mixed-Integer Dynamic Optimization (MIDO) problem. The reactor dynamic;Abstract In this work we propose a simultaneous scheduling and control optimization formulation to ad- dress both optimal steady-state production and dynamic product transitions in multiproduct parallel

Grossmann, Ignacio E.

470

Energy-Aware Meeting Scheduling Algorithms for Smart Buildings  

E-Print Network [OSTI]

The increasing worldwide concern over the energy con- sumption of commercial buildings calls for new approaches; Build- ing energy efficiency 1 Introduction The energy consumption of commercial buildings is of growingEnergy-Aware Meeting Scheduling Algorithms for Smart Buildings Abhinandan Majumdar Computer Systems

Albonesi, David H.

471

Hydro-Thermal Scheduling (HTS) 1.0 Introduction  

E-Print Network [OSTI]

1 Hydro-Thermal Scheduling (HTS) 1.0 Introduction From an overall systems view, the single most, relative to that of thermal plants, are very small. There are three basic types of hydroelectric plants;2 Pump-storage This kind of hydro plant is a specialized reservoir-type plant which has capability to act

McCalley, James D.

472

Power-Aware Dynamic Task Scheduling for Heterogeneous Accelerated Clusters  

E-Print Network [OSTI]

Power-Aware Dynamic Task Scheduling for Heterogeneous Accelerated Clusters Tomoaki Hamano, Toshio Endo and Satoshi Matsuoka Tokyo Institute of Technology/JST, Japan Abstract Recent accelerators with accelerators and general CPUs are becoming popular, such as LANL's Roadrun- ner and our own TSUBAME

473

Optimal Scheduling of Industrial Combined Heat and Power Plants  

E-Print Network [OSTI]

Optimal Scheduling of Industrial Combined Heat and Power Plants under Time-sensitive Electricity Prices Sumit Mitra , Lige Sun , Ignacio E. Grossmann December 24, 2012 Abstract Combined heat and power companies. However, under-utilization can be a chance for tighter interaction with the power grid, which

Grossmann, Ignacio E.

474

Energy-Efficient Flow Time Scheduling: An Experimental Study  

E-Print Network [OSTI]

] and Intel's Speedstep [6]. Running a job at a slower speed saves energy, yet it takes longer time and may and energy. An algorithm called AJC (active job count) has been proposed [3, 7], in which the speedEnergy-Efficient Flow Time Scheduling: An Experimental Study Jude-Thaddeus Ojiaku (speaker) Daniel

Wong, Prudence W.H.

475

Deadline Scheduling and Power Management for Speed Bounded Processors  

E-Print Network [OSTI]

). The aim is to minimize the energy for completing all jobs by their deadlines. In this paper, we extend model. Assuming no sleep state, a scheduler, to save energy, probably runs a job as slow as its deadline-Kei Lee Isaac K.K. To Prudence W.H. Wong 1 Introduction Energy consumption has become an important issue

Wong, Prudence W.H.

476

Deadline Scheduling and Power Management for Speed Bounded Processors  

E-Print Network [OSTI]

be scaled arbitrarily high (the infinite speed model), SOA can complete all jobs with reduced energy usage,15,23,24] enables a processor to vary the speed dynamically. Running a job slower reduces energy usage, but it takes online job scheduling with speed scaling and energy usage taken into consideration. The challenge arises

Wong, Prudence W.H.

477

Nonmigratory Multiprocessor Scheduling for Response Time and Energy  

E-Print Network [OSTI]

can vary its speed dynamically. Running a job at a slower speed is more energy efficient, yet it takesS) and conserving energy. One commonly used QoS measurement for schedul­ ing jobs on a processor is the average time and energy usage into consideration. Details are as follows. 1.1 Models and Previous Work Jobs

Wong, Prudence W.H.

478

Jordan Form Numerical. . .  

E-Print Network [OSTI]

Similarity Jordan Form Numerical. . . Applications Proofs Basis change A short proof Home Page, Alabama, USA Oct 3, 2007 Jordan Normal Form Revisited Speaker: Tin-Yau Tam Graduate Student Seminar tamtiny@auburn.edu #12;Similarity Jordan Form Numerical. . . Applications Proofs Basis change A short

Tam, Tin-Yau

479

U.S. Army Corps of Engineers Delivers Cost and Schedule Validation...  

Broader source: Energy.gov (indexed) [DOE]

Army Corps of Engineers Delivers Cost and Schedule Validation for Hanford Waste Treatment Plant U.S. Army Corps of Engineers Delivers Cost and Schedule Validation for Hanford Waste...

480

A Practical Framework for Configuration of Scheduling and Concurrency Control in Linux  

E-Print Network [OSTI]

system. Only specifying the scheduling semantics for an application is not sufficient because concurrency control also significantly affects the behavior of the application. This work demonstrates the integration of the Hierarchical Group Scheduling...

Phagan, Tyrian

2011-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "form eia-6 schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Automation of airlift scheduling for the upgraded command and control system of military airlift command  

E-Print Network [OSTI]

This report describes a conceptual design for automation of the scheduling of airlift activities as part of the current upgrade of the MAC C2 System. It defines the airlift scheduling problem in generic terms before reviewing ...

Simpson, R. W.

1984-01-01T23:59:59.000Z

482

Controlled Substance Security Plan (Schedules I, II, III, IV and V Controlled Substances)  

E-Print Network [OSTI]

Controlled Substance Security Plan (Schedules I, II, III, IV and V Controlled Substances) Guidelines for Acquiring & Accounting for Controlled Substances for Scientific Use Lawrence Berkeley National;LAWRENCEBERKELEYr\\IATIOMLI-ABOMTORY CONTROLLEDSUBSTANCEPROTOCOL (SCHEDULEr& il CONTROLLEDSUBSTANCES) Gontrolled

Eisen, Michael

483

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges  

E-Print Network [OSTI]

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges H, USA Keywords: steel bridges, structural reliability, fatigue, optimal inspection, fracture, plate girder, box girder ABSTRACT: A reliability-based method for inspection scheduling of steel bridges

Manuel, Lance

484

Journal of Computing in Civil Engineering Centrality Inspired Quality Measures for Network Based Schedules  

E-Print Network [OSTI]

Journal of Computing in Civil Engineering Centrality Inspired Quality Measures for Network Based Schedules --Manuscript Draft-- Manuscript Number: Full Title: Centrality Inspired Quality Measures quality under the premise that more complex schedules would require additional coordination efforts

de Leon, Alex R.

485

Cooperative Multitasking for Heterogeneous Accelerators in the Linux Completely Fair Scheduler  

E-Print Network [OSTI]

Cooperative Multitasking for Heterogeneous Accelerators in the Linux Completely Fair Scheduler to be aware of accelerators, hold different run queues for these components and perform scheduling decisions migration of applications between accelerators. We show that cooperative multitasking is possible

Hellebrand, Sybille

486

Developing Standard Logic for a Detailed Engineering Project Schedule in the Process Industry  

E-Print Network [OSTI]

Planning Meeting (IPPM) for a standard detailed engineering project in the process industry will be used to develop scheduling logic for use in developing detail engineering project schedules. However, because the IPPM does not clearly distinguish...

Miller-Karns, Kara A.

2009-05-15T23:59:59.000Z

487

Simulation-based scheduling for parcel consolidation terminals: a comparison of iterative improvement and simulated annealing  

Science Journals Connector (OSTI)

This research explores the application of a simulation-based scheduling algorithm to generate unload schedules for processing feeder trailers in a parcel consolidation terminal. The study compares the performance of iterative improvement and simulated ...

Douglas L. McWilliams

2005-12-01T23:59:59.000Z

488

Three heuristics for transmission scheduling in sensor networks with multiple mobile sinks  

E-Print Network [OSTI]

based on different principles (imitation of human decision making, stochastic transmission and constantThree heuristics for transmission scheduling in sensor networks with multiple mobile sinks Damla Algorithms, Design, Measurement, Experimentation Keywords Sensors, Sensor Networks, Transmission scheduling

Bölöni, Ladislau L

489

Residential Energy Simulation and Scheduling: A Case Study Approach Jagannathan Venkatesh, Baris Aksanli, Tajana Simuni Rosing  

E-Print Network [OSTI]

, green energy, residential energy management, smart scheduling I. INTRODUCTION Building energy nature of home energy consumption [5]. A majority of work has focused on characterizing green energyResidential Energy Simulation and Scheduling: A Case Study Approach Jagannathan Venkatesh, Baris

Simunic, Tajana

490

Next Generation CANDU: Conceptual Design for a Short Construction Schedule  

SciTech Connect (OSTI)

Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville [Atomic Energy of Canada Ltd., Ontario (Canada)

2002-07-01T23:59:59.000Z

491

Retirement Plaque Request Form  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Retirement Plaque Request Form Retirement Plaque Request Form Fill out a separate form for each plaque requested. Allow two weeks for delivery. If you have any questions, please call Rudy Bartolo, Retirement Plaque Coordinator at ext. 5558. FORM MUST BE SUBMITTED (mailed or faxed) in order for work to commence. Return form to Retirement Plaque Coordinator, Mailstop 77R0125, or fax 4993. Please Print Clearly Requester's Name:_______________________________ Extension:_______________ Mail Stop: ________________ Today's date:__________________ With Frame _____ Without Frame_____ Date Needed: ________________________ Full name as it is to appear on plaque:_________________________________________ Number of years employed at Lab:______________ Beginning and ending dates of employment: ____________________________________

492

NEO - Forms Checklist  

Broader source: Energy.gov (indexed) [DOE]

/4/2007; please do not use older versions /4/2007; please do not use older versions Office of Human Capital Management U.S. Department of Energy New Employee Orientation FORMS CHECKLIST EOD Date: _________________ Employee Name: ________________________ Organization: ____________________________ HR Specialist: ___________________________ Telephone Number: _______________________ Admin Contact: __________________________ Telephone Number: _______________________ New Employee Orientation Forms to be issued and collected HR Orientation Team: FORM COMPLETE & SIGNED FORM NAME AND NUMBER YES NO Comments 1. Photo ID 2. Passport; Birth Certificate; or U.S. Citizenship documentation 3. Job Offer Letter Bring on 1 st Day 4. Employment & Benefits Forms listed below

493

Property:OpenEI/UtilityRate/TOUWeekendSchedule | Open Energy Information  

Open Energy Info (EERE)

TOUWeekendSchedule TOUWeekendSchedule Jump to: navigation, search This is a property of type Text. Name: TOU Weekend Schedule Pages using the property "OpenEI/UtilityRate/TOUWeekendSchedule" Showing 25 pages using this property. (previous 25) (next 25) 0 0000827d-84d0-453d-b659-b86869323897 + 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 000086db-7a5e-4356-9c57-c912f7d1622e + 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111

494

Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006  

Broader source: Energy.gov [DOE]

Docket No. EO-05-01. Exhibit D: Mirant Potomac River Schedule of Operations, January and February 2006

495

The Savannah River Site`s groundwater monitoring program: 1990 sampling schedule  

SciTech Connect (OSTI)

This schedule provides a final record of the 1990 sampling schedule for the SRS groundwater monitoring program conducted by the Environmental Protection Department/Environmental Section (EPD/EMS). It includes all the wells monitored by EPD/EMS at SRS during 1990 and identifies the constituents sampled, the sampling frequency, and the reasons for sampling. Sampling requests are incorporated into the schedule throughout the year. Drafts of the schedule are produced and revised quarterly.

Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1991-02-07T23:59:59.000Z

496

Deliberation Scheduling for Planning in Real-Time David J. Musliner  

E-Print Network [OSTI]

Deliberation Scheduling for Planning in Real-Time David J. Musliner Honeywell Laboratories david.musliner@honeywell

Krebsbach, Kurt D.

497

Property:OpenEI/UtilityRate/TOUWeekdaySchedule | Open Energy Information  

Open Energy Info (EERE)

TOUWeekdaySchedule TOUWeekdaySchedule Jump to: navigation, search This is a property of type Text. Name: TOU Weekday Schedule Pages using the property "OpenEI/UtilityRate/TOUWeekdaySchedule" Showing 25 pages using this property. (previous 25) (next 25) 0 0000827d-84d0-453d-b659-b86869323897 + 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 000086db-7a5e-4356-9c57-c912f7d1622e + 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111

498

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

499

Methods of forming steel  

DOE Patents [OSTI]

In one aspect, the invention encompasses a method of forming a steel. A metallic glass is formed and at least a portion of the glass is converted to a crystalline steel material having a nanocrystalline scale grain size. In another aspect, the invention encompasses another method of forming a steel. A molten alloy is formed and cooled the alloy at a rate which forms a metallic glass. The metallic glass is devitrified to convert the glass to a crystalline steel material having a nanocrystalline scale grain size. In yet another aspect, the invention encompasses another method of forming a steel. A first metallic glass steel substrate is provided, and a molten alloy is formed over the first metallic glass steel substrate to heat and devitrify at least some of the underlying metallic glass of the substrate.

Branagan, Daniel J. (Iona, ID); Burch, Joseph V. (Shelley, ID)

2001-01-01T23:59:59.000Z

500

Joint Power Control and Link Scheduling in Wireless Networks for Throughput Optimization  

E-Print Network [OSTI]

Joint Power Control and Link Scheduling in Wireless Networks for Throughput Optimization Liqun Fu formulate the general joint link scheduling and power control problem as an in- teger linear programming optimality. Index Terms--scheduling, power control, SINR constraints. I. INTRODUCTION Due to their unconfined

Huang, Jianwei