National Library of Energy BETA

Sample records for flood insurance act

  1. National Flood Insurance Act | Open Energy Information

    Open Energy Info (EERE)

    the Federal Insurance Administration and made flood insurance available for the first time. The Flood Disaster Protection Act of 1973 made the purchase of flood insurance...

  2. Flood Disaster Protection Act of 1973 | Open Energy Information

    Open Energy Info (EERE)

    Flood Disaster Protection Act of 1973Legal Abstract The National Flood Insurance Program (NFIP) is administered primarily under two statutes: the National Flood...

  3. FEMA - National Flood Insurance Program Elevation Certificate...

    Open Energy Info (EERE)

    and Instructions Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FEMA - National Flood Insurance Program Elevation Certificate and Instructions...

  4. FEMA - National Flood Insurance Program webpage | Open Energy...

    Open Energy Info (EERE)

    webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FEMA - National Flood Insurance Program webpage Abstract This webpage provides information on...

  5. Health Insurance Portability and Accountability Act (HIPAA) | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Health Insurance Portability and Accountability Act (HIPAA) Human Subjects Protection Program (HSPP) HSPP Home About Institutional Review Boards (IRBs) Education and Resources Regulations and Requirements Ethical Principles Federal Regulations DOE Special Requirements Health Insurance Portability and Accountability Act (HIPAA) Glossary Abbreviations Contact BER Home Contact Information Human Subjects Protection Program U.S. Department of Energy SC-23/Germantown

  6. Insurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Insurance Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance & Rates...

  7. Vermont Flood Hazard Area and River Corridor Rule | Open Energy...

    Open Energy Info (EERE)

    compliance with National Flood Insurance Program (NFIP) criteria and enhance flood resilience. (b) Avoid and minimize the loss of life and property, the disruption of commerce,...

  8. Insurance crisis

    SciTech Connect (OSTI)

    Williams, P.L.

    1996-11-01

    The article discusses the effects of financing and technology advances on the availability of insurance for independent power producers operating gas turbines. Combined cycle units which require new materials and processes make it difficult to assess risk. Insurers are denying coverage, or raising prices and deductibles. Many lenders, however, are requiring insurance prior to financing. Some solutions proposed include information sharing by industry participants and insurers and increased risk acceptance by plant owners/operators.

  9. Insurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Insurance Insurance As a Federal employee, you may be able to enroll in health, dental, vision and life insurance, flexible spending accounts, and apply for long term care insurance. Federal Employee Health Benefits Program (FEHB) Federal Employee Group Life Insurance (FEGLI) Federal Employee Dental and Vision Program (FEDVIP) Federal Long Term Care Insurance Program (FLTCIP) Flexible Spending Accounts (FSAFEDS) Life Events For additional assistance with insurance programs for federal

  10. Retiree Dental, Vision, Legal, Insurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental, Vision, Legal Retiree Dental, Vision, Legal Insurance Additional insurance coverage during retirement. Contact Retiree Insurance Providers Dental, vision, legal benefits...

  11. DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Landmark Rule for Risk Insurance for Advanced Nuclear Facilities DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities May 8, 2006 - 10:36am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) issued on Saturday, the interim final rule required by the Energy Policy Act of 2005 (EPACT) for risk insurance to facilitate construction of new advanced nuclear power facilities. The rule establishes the requirements for risk insurance to cover

  12. Retiree AD&D Insurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AD&D Insurance Retiree AD&D Insurance AD&D coverage during retirement. Contact Retiree Insurance Providers Accidental death & dismemberment (AD&D) benefits for retirees The AD&D...

  13. State Farm Insurance | Open Energy Information

    Open Energy Info (EERE)

    Farm Insurance Jump to: navigation, search Name: State Farm Insurance Place: Bloomington, IL Website: www.statefarminsurance.com References: State Farm Insurance1 Information...

  14. Mutual Insurance Company of West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    call 800-247-4184 or visit ARAGLegalCenter.com. Limitations and exclusions apply. Insurance products are underwritten by ARAG Insurance Company of Des Moines, Iowa, GuideOne ...

  15. Federal Employee Group Life Insurance (FEGLI) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Life Insurance (FEGLI) Federal Employee Group Life Insurance (FEGLI) The Federal Employees' Group Life Insurance (FEGLI) Program is a group term life insurance program for ...

  16. Distillation Column Flooding Predictor

    SciTech Connect (OSTI)

    George E. Dzyacky

    2010-11-23

    The Flooding Predictor™ is a patented advanced control technology proven in research at the Separations Research Program, University of Texas at Austin, to increase distillation column throughput by over 6%, while also increasing energy efficiency by 10%. The research was conducted under a U. S. Department of Energy Cooperative Agreement awarded to George Dzyacky of 2ndpoint, LLC. The Flooding Predictor™ works by detecting the incipient flood point and controlling the column closer to its actual hydraulic limit than historical practices have allowed. Further, the technology uses existing column instrumentation, meaning no additional refining infrastructure is required. Refiners often push distillation columns to maximize throughput, improve separation, or simply to achieve day-to-day optimization. Attempting to achieve such operating objectives is a tricky undertaking that can result in flooding. Operators and advanced control strategies alike rely on the conventional use of delta-pressure instrumentation to approximate the column’s approach to flood. But column delta-pressure is more an inference of the column’s approach to flood than it is an actual measurement of it. As a consequence, delta pressure limits are established conservatively in order to operate in a regime where the column is never expected to flood. As a result, there is much “left on the table” when operating in such a regime, i.e. the capacity difference between controlling the column to an upper delta-pressure limit and controlling it to the actual hydraulic limit. The Flooding Predictor™, an innovative pattern recognition technology, controls columns at their actual hydraulic limit, which research shows leads to a throughput increase of over 6%. Controlling closer to the hydraulic limit also permits operation in a sweet spot of increased energy-efficiency. In this region of increased column loading, the Flooding Predictor is able to exploit the benefits of higher liquid

  17. Mutual Insurance Company of West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Step : On the right side of the homepage under "Identity The Protection," click on "Create Member Account." Once you log in, create an additional username and password to For more information call - - or visit ARAGLegalCenter.com. Limitations and exclusions apply. Insurance products are underwritten by ARAG Insurance Company of Des Moines, Iowa, GuideOne ® Mutual Insurance Company of West Des Moines, Iowa or GuideOne Specialty Mutual Insurance Company of West Des Moines,

  18. Federal Employees' Group Life Insurance (FEGLI) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Option C coverage insures your spouse for up to 5 multiples of 5,000 andor eligible children for up to 5 multiples of 2,500. Cost of Insurance The cost of Basic Life Insurance ...

  19. JLab Registration/International Services - Medical Insurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Insurance A visitor and student medical insurance plan is available for purchase. A copy of each insurance applicant's valid visa/immigration documentation (if a foreign national) or driver's license (if US citizen) is required to process insurance documentation. This insurance option is offered to insure the availability of quality medical care to all of our visiting researchers and their dependents while at Jefferson Lab. Medical plans include prescription cards to all enrollees. This

  20. Quality assurance flood source and method of making

    DOE Patents [OSTI]

    Fisher, Darrell R [Richland, WA; Alexander, David L [West Richland, WA; Satz, Stanley [Surfside, FL

    2002-12-03

    Disclosed is a is an improved flood source, and method of making the same, which emits an evenly distributed flow of energy from a gamma emitting radionuclide dispersed throughout the volume of the flood source. The flood source is formed by filling a bottom pan with a mix of epoxy resin with cobalt-57, preferably at 10 to 20 millicuries and then adding a hardener. The pan is secured to a flat, level surface to prevent the pan from warping and to act as a heat sink for removal of heat from the pan during the curing of the resin-hardener mixture.

  1. Distillation Column Flooding Predictor

    SciTech Connect (OSTI)

    2002-02-01

    This factsheet describes a research project whose goal is to develop the flooding predictor, an advanced process control strategy, into a universally useable tool that will maximize the separation yield of a distillation column.

  2. Energy Insurance Brokers | Open Energy Information

    Open Energy Info (EERE)

    Insurance Brokers Jump to: navigation, search Name: Energy Insurance Brokers Place: Palm Springs, California Zip: 92262 Sector: Renewable Energy, Wind energy Product: Specializes...

  3. Self-assured through self-insurance

    SciTech Connect (OSTI)

    Boiler, D.S.

    1993-04-01

    Last October 30, the Massachusetts Department of Public Utilities adopted a new set of insurance expense allowances for Bay State Gas Co., consistent with the company's switch from traditional insurance carriers to self-insured status for its workers compensation accounts. The Massachusetts action is one of the latest in an increasing movement toward self-insurance in the utility industry.

  4. Federal Long Tern Care Insurance Program (FLTCIP)

    Broader source: Energy.gov [DOE]

    The Federal Long Term Care Insurance Program (FLTCIP) provides long term care insurance to help pay for costs of care when enrollees need help with activities they perform every day, or you have a...

  5. Recovery Act

    Broader source: Energy.gov [DOE]

    Recovery Act and Energy Department programs were designed to stimulate the economy while creating new power sources, conserving resources and aligning the nation to once again lead the global energy economy.

  6. Improving Gas Flooding Efficiency

    SciTech Connect (OSTI)

    Reid Grigg; Robert Svec; Zheng Zeng; Alexander Mikhalin; Yi Lin; Guoqiang Yin; Solomon Ampir; Rashid Kassim

    2008-03-31

    This study focuses on laboratory studies with related analytical and numerical models, as well as work with operators for field tests to enhance our understanding of and capabilities for more efficient enhanced oil recovery (EOR). Much of the work has been performed at reservoir conditions. This includes a bubble chamber and several core flood apparatus developed or modified to measure interfacial tension (IFT), critical micelle concentration (CMC), foam durability, surfactant sorption at reservoir conditions, and pressure and temperature effects on foam systems.Carbon dioxide and N{sub 2} systems have been considered, under both miscible and immiscible conditions. The injection of CO2 into brine-saturated sandstone and carbonate core results in brine saturation reduction in the range of 62 to 82% brine in the tests presented in this paper. In each test, over 90% of the reduction occurred with less than 0.5 PV of CO{sub 2} injected, with very little additional brine production after 0.5 PV of CO{sub 2} injected. Adsorption of all considered surfactant is a significant problem. Most of the effect is reversible, but the amount required for foaming is large in terms of volume and cost for all considered surfactants. Some foams increase resistance to the value beyond what is practical in the reservoir. Sandstone, limestone, and dolomite core samples were tested. Dissolution of reservoir rock and/or cement, especially carbonates, under acid conditions of CO2 injection is a potential problem in CO2 injection into geological formations. Another potential change in reservoir injectivity and productivity will be the precipitation of dissolved carbonates as the brine flows and pressure decreases. The results of this report provide methods for determining surfactant sorption and can be used to aid in the determination of surfactant requirements for reservoir use in a CO{sub 2}-foam flood for mobility control. It also provides data to be used to determine rock permeability

  7. Insurance payment process for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Wilson, D.

    1998-08-24

    The Pensions and Savings group handles three types of payment into and out of Fluor Daniel Hanford related to insurance benefits: Premium payment to insurance company; Application of employee insurance withholding against insurance costs; Remittance of insurance claims, and administrative fees. General approach in making and recording the remittance is by forwarding payment information to Accounts Payable Master.

  8. Life Insurance | National Nuclear Security Administration | ...

    National Nuclear Security Administration (NNSA)

    As a new Federal employee, you will automatically receive basic life insurance coverage with premiums deducted from your paycheck. You will have options to waive or expand ...

  9. gas_flooding | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gas Flooding Gas flooding technologies primarily use carbon dioxide flooding as a method to produce more oil from the reservoir by channeling gas into previously-bypassed areas. CO2 flooding technologies experiment with a number of foams, gels, and thickening agents to improve sweep efficiency. CO2 floods are extensively used in some regions of the U.S., particularly in West Texas and the southern Rocky Mountains. CO2 flooding currently produces about 190,000 BOPD. In the past decade flooding

  10. Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard builds upon Executive Order (E.O.) 11988 and is to be incorporated into existing Federal department and agency processes used to implement E.O. 11988.

  11. Links Between Flood Frequency and Annual Water Balance Behaviors: A Basis for Similarity and Regionalization

    SciTech Connect (OSTI)

    Guo, Jiali; Li, Hongyi; Leung, Lai-Yung R.; Guo, Shenglian; Liu, Pan; Sivapalan, Murugesu

    2014-03-28

    This paper presents the results of a data based comparative study of several hundred catchments across continental United States belonging to the MOPEX dataset, which systematically explored the connection between the flood frequency curve and measures of mean annual water balance. Two different measures of mean annual water balance are used: (i) a climatic aridity index, AI, which is a measure of the competition between water and energy availability at the annual scale; and, (ii) baseflow index, BFI, the ratio of slow runoff to total runoff also at the annual time scale, reflecting the role of geology, soils, topography and vegetation. The data analyses showed that the aridity index, AI, has a first order control on both the mean and Cv of annual maximum floods. While mean annual flood decreases with increasing aridity, Cv increases with increasing aridity. BFI appeared to be a second order control on the magnitude and shape of the flood frequency curve. Higher BFI, meaning more subsurface flow and less surface flow leads to a decrease of mean annual flood whereas lower BFI leads to accumulation of soil moisture and increased flood magnitudes that arise from many events acting together. The results presented in this paper provide innovative means to delineate homogeneous regions within which the flood frequency curves can be assumed to be functionally similar. At another level, understanding the connection between annual water balance and flood frequency will be another building block towards developing comprehensive understanding of catchment runoff behavior in a holistic way.

  12. Oilfield flooding polymer

    DOE Patents [OSTI]

    Martin, Fred D.; Hatch, Melvin J.; Shepitka, Joel S.; Donaruma, Lorraine G.

    1986-01-01

    A monomer, polymers containing the monomer, and the use of the polymer in oilfield flooding is disclosed. The subject monomer is represented by the general formula: ##STR1## wherein: n is an integer from 0 to about 4; m is an integer from 0 to about 6; a is an integer equal to at least 1 except where m is equal to 0, a must equal 0 and where m is equal to 1, a must equal 0 or 1; p is an integer from 2 to about 10; b is an integer equal to at least 1 and is of sufficient magnitude that the ratio b/p is at least 0.2; and q is an integer from 0 to 2. The number of hydroxy groups in the monomer is believed to be critical, and therefore the sum of (a+b) divided by the sum (m+p) should be at least 0.2. The moieties linked to the acrylic nitrogen can be joined to provide a ringed structure.

  13. H. R. 4053: This Act may be cited as the Coalfield Environment Enhancement Act of 1990. Introduced in the Senate of the United States, One Hundredth First Congress, Second Session, July 11, 1990

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    This bill would amend the Surface Mining Control and Reclamation Act of 1977 to provide for the remining of certain abandoned coal mine lands. After defining the necessary terms, the bill describes the right of states to establish a State Remining Insurance Program, insurance coverage, bonds, the determination of unanticipated event or condition, the State Remining Insurance Fund, source of funding and interest and premiums, penalties and enforcement, conforming amendments, special rules applicable to remining operations, and abandoned coal refuse piles.

  14. Boosting investor yields through bond insurance

    SciTech Connect (OSTI)

    Mosbacher, M.L.; Burkhardt, D.A.

    1993-02-01

    The market for utility securities generally tends to be fairly static. Innovative financing techniques are rarely used because of the marketability of utility securities stemming from the companies' generally strong financial credit and the monopoly markets most utilities serve. To many people, utility securities are considered the pillars of the financial world, and innovation is not needed. Further, plain vanilla utility issues are easily understood by investors, as well as by regulators and customers. Over the past several years, however, a new utility bond product has crept into the world of utility securities - insured secondary utility bonds. These insured bonds may possibly be used as an alternative financing technique for newly issued debt. Individual investors often tend to rely on insurance as a tool for reducing credit risk and are willing to take the lower yields as a tradeoff. Insured utility bonds are created by brokerage firms through the acqusition of a portion of an outstanding utility bond issue and subsequent solicitation of the insurance companies for bids. The insurance company then agrees to insure that portion of the issue until maturity for a fee, and the brokerage firm sells those bonds to their customers as a AAA-insured bond. Issuers are encouraged to explore the retail market as a financing alternative. They may find a most cost-effective means of raising capital.

  15. Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy

  16. DOE Releases Filing Instructions for Federal Risk Insurance for...

    Energy Savers [EERE]

    Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants DOE Releases Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants December 21, ...

  17. Federal Flood Risk Management Standard (2015)

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  18. Federal Flood Risk Management Standard (FEMA, 2015)

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  19. Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC Insurance Eligibility, PIA, Bechtel Jacobs Company, LLC (207.07 KB) More Documents & Publications Medgate, PIA, Bechtel Jacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Oracle Financials PIA, Bechtel Jacobs Company, LLC

  20. Los Alamos plants willows for flood recovery

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plants willows Los Alamos plants willows for flood recovery The Laboratory's Corrective Actions Program (CAP) planted nearly 10,000 willows to help preserve the Pueblo Canyon wetland after damage from September 2013 floods. June 18, 2014 In a flood recovery effort designed to stop further erosion in Pueblo Canyon, in April, Los Alamos planted nearly 10,000 willows along the stream banks surrounding the wetland. In a flood recovery effort designed to stop further erosion in Pueblo Canyon, Los

  1. Flooded First Street at Y-12 Plant | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Flooded First Street at ... Flooded First Street at Y-12 Plant Vehicles negotiate flooded First Street at Y-12 Plant

  2. We are providing this notice to you as required by the Affordable Care Act, to i

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are providing this notice to you as required by the Affordable Care Act, to inform you about the new health exchange options available under the law. Please feel free to compare the coverage available at the exchanges with coverage at Los Alamos National Security, LLC. New Health Insurance Marketplace Coverage Options and Your Health Coverage PART A: General Information When key parts of the health care law take effect in 2014, there will be a new way to buy health insurance: the Health

  3. Global warming, insurance losses and financial industry

    SciTech Connect (OSTI)

    Low, N.C.

    1996-12-31

    Global warming causes extremely bad weather in the near term. They have already caught the attention of the insurance industry, as they suffered massive losses in the last decade. Twenty-one out of the 25 largest catastrophes in the US, mainly in the form of hurricanes have occurred in the last decade. The insurance industry has reacted by taking the risk of global warming in decisions as to pricing and underwriting decisions. But they have yet to take a more active role in regulating the factors that contributes to global warming. How global warming can impact the financial industry and the modern economy is explored. Insurance and modern financial derivatives are key to the efficient functioning of the modern economy, without which the global economy can still function but will take a giant step backward. Any risk as global warming that causes economic surprises will hamper the efficient working of the financial market and the modern economy.

  4. Insurance recovery for manufactured gas plant liabilities

    SciTech Connect (OSTI)

    Koch, G.S.; Wise, K.T.; Hanser, P.

    1997-04-15

    This article addresses insurance and liability issues arising from former manufactured gas plant sites. Three issues are discussed in detail: (1) how to place a value on a potential insurance recovery or damage award, (2) how to maximize recovery through litigation or settlement, and (3) how to mediate coverage disputes to avoid litigation. The first issue, valuing potential recovery, is discussed in the most detail. An approach is outlined which includes organizing policy data, evaluating site facts relevant to coverage, estimating site costs, estimating coverage likelihoods, and assessing the expected value of litigation. Probability and cost estimate data is provided to aid in assessments.

  5. Flood Fighting Research Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Jump to: navigation, search Basic Specifications Facility Name Flood Fighting Research Facility Overseeing Organization United States Army Corp of Engineers (ERDC)...

  6. Irrigation, Navigation Flood Control and Recreation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Irrigation,-Navigation-Flood-Control-and-Recreation- Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  7. Flooding Capability for River-based Scenarios

    SciTech Connect (OSTI)

    Smith, Curtis L.; Prescott, Steven; Ryan, Emerald; Calhoun, Donna; Sampath, Ramprasad; Anderson, S. Danielle; Casteneda, Cody

    2015-10-01

    This report describes the initial investigation into modeling and simulation tools for application of riverine flooding representation as part of the Risk-Informed Safety Margin Characterization (RISMC) Pathway external hazards evaluations. The report provides examples of different flooding conditions and scenarios that could impact river and watershed systems. Both 2D and 3D modeling approaches are described.

  8. Topography-based Flood Planning and Optimization Capability Developmen...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Report: Topography-based Flood Planning and Optimization Capability Development Report Citation Details In-Document Search Title: Topography-based Flood Planning and ...

  9. New Flood Risk Management Standard Responds to Effects of Climate...

    Energy Savers [EERE]

    and resilience against flooding." The principal change is the establishment of the Federal Flood Risk Management Standard, "a flexible framework to increase resilience against ...

  10. Determining Hydrological Controls on Flood Frequency | U.S. DOE...

    Office of Science (SC) Website

    Aerial view of homes inundated with water following a 2011 flood in Minot, N.D. ... to better understand the relationship between annual water balance and flood frequency. ...

  11. Copula-Based Flood Frequency Analysis at Ungauged Basin Confluences...

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Search Results Journal Article: Copula-Based Flood Frequency Analysis at ... sustain user needs while also posing an increased flooding risk from multiple tributaries. ...

  12. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Recovery Act More Documents & Publications Overview of Recovery Act FAR Clauses Map Data: Recovery Act Funding DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage

  13. Risk transfer via energy savings insurance

    SciTech Connect (OSTI)

    Mills, Evan

    2001-10-01

    Among the key barriers to investment in energy efficiency improvements are uncertainties about attaining projected energy savings and apprehension about potential disputes over these savings. The fields of energy management and risk management are thus intertwined. While many technical methods have emerged to manage performance risks (e.g. building commissioning), financial risk transfer techniques are less developed in the energy management arena than in other more mature segments of the economy. Energy Savings Insurance (ESI) - formal insurance of predicted energy savings - is one method of transferring financial risks away from the facility owner or energy services contractor. ESI offers a number of significant advantages over other forms of financial risk transfer, e.g. savings guarantees or performance bonds. ESI providers manage risk via pre-construction design review as well as post-construction commissioning and measurement and verification of savings. We found that the two mos t common criticisms of ESI - excessive pricing and onerous exclusions - are not born out in practice. In fact, if properly applied, ESI can potentially reduce the net cost of energy savings projects by reducing the interest rates charged by lenders, and by increasing the level of savings through quality control. Debt service can also be ensured by matching loan payments to projected energy savings while designing the insurance mechanism so that payments are made by the insurer in the event of a savings shortfall. We estimate the U.S. ESI market potential of $875 million/year in premium income. From an energy-policy perspective, ESI offers a number of potential benefits: ESI transfers performance risk from the balance sheet of the entity implementing the energy savings project, thereby freeing up capital otherwise needed to ''self-insure'' the savings. ESI reduces barriers to market entry of smaller energy services firms who do not have sufficiently strong balance sheets to self-insure

  14. Energy-conscious construction: Litigation insurance?

    SciTech Connect (OSTI)

    Luhr, S.

    1997-11-01

    Construction defects are annoying for homeowners, and can bring on litigation that can wipe out builders. The design and construction techniques adopted by energy efficiency-minded builders may be one method of insuring a project against defects and litigation. This article discusses what to do to prevent litigation in preconstruction, construction, and postconstruction, making the modern job site work, standards for energy efficient construction, and possibilities in the future.

  15. FOIA, The Privacy Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOIA, the Privacy Act Your Rights under the FOIA, the Privacy Act, and other Privacy Laws The Freedom of Information Act and Privacy Act Division/Office is responsible for administering policies, programs, and procedures to ensure DOE compliance with the Freedom of Information Act (FOIA) and the Privacy Act (PA), 5 U.S.C. 552 and 5 U.S.C. 552a, respectively. The resources on these pages are provided to aid in finding answers to your questions about programs of the Department of Energy and to

  16. Aqueous flooding methods for tertiary oil recovery

    DOE Patents [OSTI]

    Peru, Deborah A.

    1989-01-01

    A method of aqueous flooding of subterranean oil bearing formation for tertiary oil recovery involves injecting through a well into the formation a low alkaline pH aqueous sodium bicarbonate flooding solution. The flooding solution's pH ranges from about 8.25 to 9.25 and comprises from 0.25 to 5 weight percent and preferably about 0.75 to 3.0 weight percent of sodium bicarbonate and includes a petroleum recovery surfactant of 0.05 to 1.0 weight percent and between 1 and 20 weight percent of sodium chloride. After flooding, an oil and water mixture is withdrawn from the well and the oil is separated from the oil and water mixture.

  17. gas_flooding | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    illustrates a nitrogen-CO2 flood. This and other cross-sectional illustrations of EOR methods that are in the public domain are available free from NETL. photo of a CO2...

  18. Oil recovery by nitrogen flooding. Final report

    SciTech Connect (OSTI)

    Ronde, H.; Hagoort, J.

    1992-03-01

    The general objective of the project is the Establishment of technical and economic design criteria and evaluation tools for oil and condensate recovery by Nitrogen Injection. The main objective has been divided into the following specific objectives: Determination of the effect of oil composition on the oil recovery; Investigation of the pros and cons of slim-tube experiments as a tool for the design and evaluation of nitrogen flooding; Measurement and calculation of the minimum miscibility pressures (MMP) for nitrogen flooding.

  19. Privacy Act of 1974; Publication of Compilation of Privacy Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of ...

  20. Intergovernmental Personnel Act Assignments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-08-24

    This Manual implements provisions of the Intergovernmental Personnel Act (IPA) within the Department of Energy (DOE) and establishes requirements, responsibilities, and authority for effecting assignments under the Act. Does not cancel other directives.

  1. Recovery Act Milestones

    ScienceCinema (OSTI)

    Rogers, Matt

    2013-05-29

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  2. Page 5, Federal Employees' Group Life Insurance (FEGLI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 of 11 Previous Page Federal Employees' Group Life Insurance (FEGLI) Initial Enrollment Period All Employees in eligible positions are automatically enrolled in Basic Life...

  3. NREL Report Says Insurance Industry Can Benefit by Using Solar...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    report discusses the impact of natural catastrophes on the insurance industry, the effect of power outages on businesses and people and the risks of portable power generators. ...

  4. "Insurance as a Risk Management Instrument for Energy Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience" Report (March 2013) The Office of Electricity Delivery and Energy Reliability has ...

  5. Secretary Bodman Announces Federal Risk Insurance for Nuclear...

    Energy Savers [EERE]

    The rule will be available on DOE's web site soon. "Providing federal risk insurance is an important step in speeding the nuclear renaissance in this country," Secretary Bodman ...

  6. ACT-ARA

    Energy Science and Technology Software Center (OSTI)

    003092IBMPC00 ACT-ARA: Code System for the Calculation of Changes in Radiological Source Terms with Time

  7. Insuring Solar Photovoltaics: Challenges and Possible Solutions; (Revised)

    SciTech Connect (OSTI)

    Speer, B.; Mendelsohn, M.; Cory, K.

    2010-02-01

    Insuring solar photovoltaic (PV) systems poses certain challenges. Insurance premiums, which can represent a significant part of overall costs for PV developers, can affect market competition. The market for certain types of insurance products is limited. Historical loss data is lacking, and test data for the long-term viability of PV products under real-life conditions is limited. Insurers' knowledge about PV systems and the PV industry is uneven even as the industry introduces innovative contractual structures and business models. Interviews conducted for this report with PV project developers, insurance brokers, and underwriters suggest government actions aimed at better testing, data collection, and communication could facilitate the development of a market for PV insurance products. This report identifies actions by governments, national laboratories, and other stakeholders that could accelerate the development of insurance products in support PV systems. Such actions include: increasing understanding of the solar PV industry among insurance professionals; expanding the availability of PV historical loss data; evaluating the expansion of renewable energy business classification; developing module and component testing capabilities and services offered by federal labs; and, advancing industry standards for PV system installers.

  8. Substation flood protection: A case study

    SciTech Connect (OSTI)

    Gacek, D.B.; McGovern, L.L.

    1999-11-01

    On July 18, 1996, the City of Naperville, Illinois encountered a substantial storm event ranging from nine to fourteen inches of rainfall across town in less than twelve hours, with the majority falling over a four-hour period. The watershed containing the City`s Westside substation encountered the most significant rainfall totals, resulting in a flood crest in the substation area of approximately thirteen inches of water. The station is a 138 kV substation, and the flooding of this station caused a power loss to approximately 60% of the City`s customers for more than eight hours. The water level posed no threat to yard equipment, however, within the substation control building, flood water shorted out control circuits and damaged transmission line relay systems. Crews worked round-the-clock for most of a week to return all transmission lines and transformers to normal service. The 15 kV switchgear ultimately had to be replaced due to recurring control circuit problems. Once the station was restored and the cleanup efforts underway, the City embarked on an evaluation to determine what condition or conditions allowed the flooding to occur, and what could be done in the future to avoid this problem to ensure that the customers of Naperville would not experience another service outage of this magnitude due to flooding.

  9. Insurance for electric and magnetic field litigation: Are you covered

    SciTech Connect (OSTI)

    Anderson, E.R.; Stewart, C.A. III

    1993-04-01

    Electrical power generating companies, power transmission companies and large generators and users of electrical power recently felt the sting of a second shock. The first shock came when lawsuits were first filed against companies in the electrical power industry claiming real or imagined damages from electrical and magnetic fields ([open quotes]EMFs[close quotes]). The new and second shock is potentially more devastating because it comes from the [open quotes]safe hands[close quotes] of the insurance industry. Standard-form comprehensive general liability ([open quotes]CGL[close quotes]) insurance policies purchased by nearly every company in the electrical power industry for generations are supposed to cover EMF bodily injury and property damage claims. Not so, say the lawyers for the most prominent insurance company selling insurance coverage to electric utilities, Associated Electric Gas Insurance Services, Ltd. ([open quotes]AEGIS[close quotes]).

  10. Flood Forecasting in River System Using ANFIS

    SciTech Connect (OSTI)

    Ullah, Nazrin; Choudhury, P.

    2010-10-26

    The aim of the present study is to investigate applicability of artificial intelligence techniques such as ANFIS (Adaptive Neuro-Fuzzy Inference System) in forecasting flood flow in a river system. The proposed technique combines the learning ability of neural network with the transparent linguistic representation of fuzzy system. The technique is applied to forecast discharge at a downstream station using flow information at various upstream stations. A total of three years data has been selected for the implementation of this model. ANFIS models with various input structures and membership functions are constructed, trained and tested to evaluate efficiency of the models. Statistical indices such as Root Mean Square Error (RMSE), Correlation Coefficient (CORR) and Coefficient of Efficiency (CE) are used to evaluate performance of the ANFIS models in forecasting river flood. The values of the indices show that ANFIS model can accurately and reliably be used to forecast flood in a river system.

  11. ARM - Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In other Recovery Act news, the remote balloon launcher was ... new aerosols observation systems passed acceptance testing ... By moving to the fast-switching dual polarization technology...

  12. EM Recovery Act Performance

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40...

  13. Recovery Act Open House

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    light snacks for those attending. DOE ID Manager Rick Provencher discusses the non-cleanup work that was accomplished with Recovery Act funding. Editorial Date November 15, 2010...

  14. Price-Anderson Act

    Broader source: Energy.gov [DOE]

    The Price-Anderson Act (PAA) provides a system of indemnification for legal liability resulting from a nuclear incident in connection with contractual activity for DOE.

  15. A flooding induced station blackout analysis for a pressurized water reactor using the RISMC toolkit

    SciTech Connect (OSTI)

    Mandelli, Diego; Prescott, Steven; Smith, Curtis; Alfonsi, Andrea; Rabiti, Cristian; Cogliati, Joshua; Kinoshita, Robert

    2015-05-17

    In this paper we evaluate the impact of a power uprate on a pressurized water reactor (PWR) for a tsunami-induced flooding test case. This analysis is performed using the RISMC toolkit: the RELAP-7 and RAVEN codes. RELAP-7 is the new generation of system analysis codes that is responsible for simulating the thermal-hydraulic dynamics of PWR and boiling water reactor systems. RAVEN has two capabilities: to act as a controller of the RELAP-7 simulation (e.g., component/system activation) and to perform statistical analyses. In our case, the simulation of the flooding is performed by using an advanced smooth particle hydrodynamics code called NEUTRINO. The obtained results allow the user to investigate and quantify the impact of timing and sequencing of events on system safety. The impact of power uprate is determined in terms of both core damage probability and safety margins.

  16. A flooding induced station blackout analysis for a pressurized water reactor using the RISMC toolkit

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mandelli, Diego; Prescott, Steven; Smith, Curtis; Alfonsi, Andrea; Rabiti, Cristian; Cogliati, Joshua; Kinoshita, Robert

    2015-05-17

    In this paper we evaluate the impact of a power uprate on a pressurized water reactor (PWR) for a tsunami-induced flooding test case. This analysis is performed using the RISMC toolkit: the RELAP-7 and RAVEN codes. RELAP-7 is the new generation of system analysis codes that is responsible for simulating the thermal-hydraulic dynamics of PWR and boiling water reactor systems. RAVEN has two capabilities: to act as a controller of the RELAP-7 simulation (e.g., component/system activation) and to perform statistical analyses. In our case, the simulation of the flooding is performed by using an advanced smooth particle hydrodynamics code calledmore » NEUTRINO. The obtained results allow the user to investigate and quantify the impact of timing and sequencing of events on system safety. The impact of power uprate is determined in terms of both core damage probability and safety margins.« less

  17. Fuel cell flooding detection and correction

    DOE Patents [OSTI]

    DiPierno Bosco, Andrew; Fronk, Matthew Howard

    2000-08-15

    Method and apparatus for monitoring an H.sub.2 -O.sub.2 PEM fuel cells to detect and correct flooding. The pressure drop across a given H.sub.2 or O.sub.2 flow field is monitored and compared to predetermined thresholds of unacceptability. If the pressure drop exists a threshold of unacceptability corrective measures are automatically initiated.

  18. Improved Efficiency of Miscible CO2 Floods and Enhanced Prospects for CO2 Flooding Heterogeneous Reservoirs

    SciTech Connect (OSTI)

    Grigg, Reid B.; Schechter, David S.

    1999-10-15

    The goal of this project is to improve the efficiency of miscible CO2 floods and enhance the prospects for flooding heterogeneous reservoirs. This report provides results of the second year of the three-year project that will be exploring three principles: (1) Fluid and matrix interactions (understanding the problems). (2) Conformance control/sweep efficiency (solving the problems. 3) Reservoir simulation for improved oil recovery (predicting results).

  19. H. R. 4053: A Bill to amend the Surface Mining Control and Reclamation Act of 1977 to provide for the remining of certain abandoned coal mine lands. Introduced in the House of Representatives, One Hundredth First Congress, Second Session, February 21, 1990

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The bill would amend the Surface Mining Control and Reclamation Act of 1977 to provide for the remining of certain abandoned coal mine lands. The bill describes definitions; state remining insurance programs; state self-sustaining remining insurance fund; penalties and enforcement; special rules applicable to remining operations; and abandoned coal refuse and disposal piles.

  20. John K. Medici (Acting)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Mr. John K. Medici serves as the (Acting) Deputy Chief Information Officer (OCIO) for Cybersecurity for the Department of Energy (DOE).  He has over 18 years of technical implementation and...

  1. River and Harbors Act

    Broader source: Energy.gov [DOE]

    Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) prohibits the unauthorized obstruction or alteration of any navigable water of the United States.

  2. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S (BPA) - NN-1 Cc: Shay, Don Subject: Request for Corona and Field Effects Program Hi Kim, Pursuant to the Freedom of Information Act, I would like to request a copy of...

  3. Recovery Act Milestones

    Broader source: Energy.gov [DOE]

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to...

  4. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Privacy Act must be signed and, therefore, cannot be submitted on this form. l DATE Name Richard van Dijk Email Orga nizati - on Mailin g Addre ss City 01 4 State I P Phon e Ex....

  5. Paperwork Reduction Act

    Broader source: Energy.gov [DOE]

    The Paperwork Reduction Act requires that all federal websites request permission from the Office of Management and Budget (OMB) before collecting information from 10 or more members of the public....

  6. Energy and Water Act

    Broader source: Energy.gov (indexed) [DOE]

    Letter 2004-02 - FY 2004 Le2islation Provisions (dated March 1.2004) Energy and Water Act AL-2004-02 provides guidance regarding the implementation of Section 30 I. 304....

  7. Freedom of Information Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02, 2014 1:45 PM Submitted by Anonymous User This message was created by a Microsoft InfoPath form. The form data may be included as an attachment. Freedom of Information Act...

  8. Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Touts Robust Economy | Department of Energy Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy August 4, 2006 - 8:42am Addthis ATLANTA, GA - After touring Georgia Power and speaking to its employees, U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced completion of the final rule that establishes the process for utility companies building

  9. Jobs Day and Nuclear Risk Insurance Announcement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jobs Day and Nuclear Risk Insurance Announcement Jobs Day and Nuclear Risk Insurance Announcement August 4, 2006 - 8:41am Addthis Prepared Remarks for Energy Secretary Bodman Thank you all for being here and thanks, Mike, for that very nice introduction and for the tour of your transmission control center. I also want to thank Southern Company and Georgia Power for arranging this event and I appreciate Lauren Walker from Governor Perdue's office and Derick Corbett from Congressman Linder's

  10. Energy-Efficiency Options for Insurance Loss Prevention

    SciTech Connect (OSTI)

    Mills, E.; Knoepfel, I.

    1997-06-09

    Energy-efficiency improvements offer the insurance industry two areas of opportunity: reducing ordinary claims and avoiding greenhouse gas emissions that could precipitate natural disaster losses resulting from global climate change. We present three vehicles for taking advantage of this opportunity, including research and development, in- house energy management, and provision of key information to insurance customers and risk managers. The complementary role for renewable energy systems is also introduced.

  11. Flood analyses for Department of Energy Y-12, ORNL and K-25 Plants. Flood analyses in support of flood emergency planning

    SciTech Connect (OSTI)

    1995-05-01

    The study involved defining the flood potential and local rainfall depth and duration data for the Department of Energy`s (DOE) Y-12, Oak Ridge National Laboratory (ORNL), and K-25 plants. All three plants are subject to flooding from the Clinch River. In addition, the Y-12 plant is subject to flooding from East Fork Poplar and Bear Creeks, the ORNL plant from Whiteoak Creek and Melton Branch, and the K-25 plant from Poplar Creek. Determination of flood levels included consideration of both rainfall events and postulated failures of Norris and Melton Hill Dams in seismic events.

  12. H. R. 2882: This Act may be cited as the FHA Energy Efficiency Incentives Act of 1991, introduced in the US House of Representatives, One Hundred Second Congress, First Session, July 11, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This bill would amend the National Housing Act to require the Secretary of Housing and Urban Development to carry out and promote a program to provide mortgage financing incentives for energy-efficient housing subject to mortgages insured under such Act. The bill describes financial incentives for energy efficient housing, qualified mortgages, promotion of the program, financing the program, and increased mortgage limits for energy efficiency improvements.

  13. American Recovery and Reinvestment Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    American Recovery and Reinvestment Act American Recovery and Reinvestment Act LANL was able to accelerate demolition and cleanup thanks to a 212 million award from the American...

  14. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    With the passage of the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of Energy (Department) will have new responsibilities and receive ...

  15. Modeling of a Flooding Induced Station Blackout for a Pressurized Water Reactor Using the RISMC Toolkit

    SciTech Connect (OSTI)

    Mandelli, Diego; Prescott, Steven R; Smith, Curtis L; Alfonsi, Andrea; Rabiti, Cristian; Cogliati, Joshua J; Kinoshita, Robert A

    2011-07-01

    In the Risk Informed Safety Margin Characterization (RISMC) approach we want to understand not just the frequency of an event like core damage, but how close we are (or are not) to key safety-related events and how might we increase our safety margins. The RISMC Pathway uses the probabilistic margin approach to quantify impacts to reliability and safety by coupling both probabilistic (via stochastic simulation) and mechanistic (via physics models) approaches. This coupling takes place through the interchange of physical parameters and operational or accident scenarios. In this paper we apply the RISMC approach to evaluate the impact of a power uprate on a pressurized water reactor (PWR) for a tsunami-induced flooding test case. This analysis is performed using the RISMC toolkit: RELAP-7 and RAVEN codes. RELAP-7 is the new generation of system analysis codes that is responsible for simulating the thermal-hydraulic dynamics of PWR and boiling water reactor systems. RAVEN has two capabilities: to act as a controller of the RELAP-7 simulation (e.g., system activation) and to perform statistical analyses (e.g., run multiple RELAP-7 simulations where sequencing/timing of events have been changed according to a set of stochastic distributions). By using the RISMC toolkit, we can evaluate how power uprate affects the system recovery measures needed to avoid core damage after the PWR lost all available AC power by a tsunami induced flooding. The simulation of the actual flooding is performed by using a smooth particle hydrodynamics code: NEUTRINO.

  16. American Disabilities Act

    Broader source: Energy.gov [DOE]

    The Americans with Disabilities Act prohibits private employers, state and local governments, employment agencies and labor unions from discriminating against qualified individuals with disabilities in job application procedures, hiring, firing, advancement, compensation, job training, and other terms, conditions, and privileges of employment.

  17. Paperwork Reduction Act Forms

    Office of Energy Efficiency and Renewable Energy (EERE)

    You may need to fill out one or several of these forms depending on the nature of your survey or usability project. See the Paperwork Reduction Act Web page for more information about the process. Contact the Web Usability Coordinator if you have questions about which forms to complete.

  18. Paperwork Reductin Act Form

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAPERWORK REDUCTION ACT COLLECTION DISCONTINUATION FORM Agency/Subagency OMB Control Number __ __ __ __ - __ __ __ __ Title of Collection: Current Expiration Date Month/Year Requested Expiration Date to Discontinue Collection Month/Year Reason for Discontinuation: Signature of Senior Official or Designee: Date: For OIRA Use ________________________ ________________________ OMB FORM 83-D, 10/04 Reset Form

  19. Clean Air Act

    Office of Energy Efficiency and Renewable Energy (EERE)

    The primary law governing the Department of Energy (DOE) air pollution control activities is the Clean Air Act (CAA). This law defines the role of the U.S. Environmental Protection Agency (EPA) and state, local and tribal air programs in protecting and improving the nation’s air quality and stratospheric ozone layer by regulating emissions from mobile and stationary sources.

  20. American Recovery & Reinvestment Act of 2009 (Recovery Act or ARRA) Davis-Bacon Act Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA Albuquerque Service Center Labor Standards Training March 9, 2015 Eva M. Auman eva.auman@hq.doe.gov 1 Labor Standards Statutes  The Davis-Bacon Act (DBA)  Davis-Bacon and Related Acts (DBRA)  Contract Work Hours and Safety Standards Act (CWHSSA)  Copeland "Anti-Kickback" Act (CA)  Walsh-Healey Public Contracts Act (PCA)  McNamara-O'Hara Service Contract Act(SCA)  Miller Act (MA)  Fair Labor Standards Act (FLSA) 2 Labor Standards - Presidential Executive

  1. Recovery Act: State Assistance for Recovery Act Related Electricity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policies | Department of Energy Act: State Assistance for Recovery Act Related Electricity Policies Recovery Act: State Assistance for Recovery Act Related Electricity Policies $44 Million for State Public Utility Commissions State public utility commissions (PUCs), which regulate and oversee electricity projects in their states, will be receiving more than $44.2 million in Recovery Act funding to hire new staff and retrain existing employees to ensure they have the capacity to quickly and

  2. DOE specification: Flooded-type lead-acid storage batteries

    SciTech Connect (OSTI)

    1996-08-01

    This document contains a ``fill-in-the-blanks`` guide specification for procurement of flooded-type lead-acid storage batteries, for uninterruptible power supply applications.

  3. Vermont Agency of Natural Resources Flood Hazard Area & River...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont Agency of Natural Resources Flood Hazard Area & River Corridor...

  4. Reviewing the success of intentional flooding of the Grand Canyon

    SciTech Connect (OSTI)

    Wirth, B.D.

    1997-04-01

    A description and evaluation of the results of an intentional flooding experiment at the Grand Canyon are described. The purpose of the 7-day release of flood waters from the Glen Canyon Dam was to determine if managed floods have the ability to predictably restore the riverine environment. A summary of environmental conditions leading to the experiment is provided and flood results are listed. Initial results showed significant improvement in the size and number of the river`s beaches, creation of backwater habitat for endangered species, and no adverse impact to the trout fishery, Indian cultural sites, and other resources.

  5. Pantex Facility 10-Year Natural Phenomena Flood Hazard Analysis

    Office of Environmental Management (EM)

    Pantex Facility 10-Year Natural Phenomena Flood Hazard Analysis Presented by and October, 2011 Presentation Outline I. Introductions II. Pantex III. 10 Year Update IV. Final ...

  6. Vermont Flood Hazard Area and River Corridor Protection Procedure...

    Open Energy Info (EERE)

    other jurisdictions on the regulatory measures necessary to avoid the endangerment of the health, safety, and welfare of the public and of riparian owners during flooding2; (5)...

  7. Vermont Flood Hazard Area and River Corridor General Permit Applicatio...

    Open Energy Info (EERE)

    the developer should provide a map generated from the ANR Natural Resources Atlas showing the river corridor and flood hazard area; A written description of the...

  8. Pantex Facility 10-Year Natural Phenomena Flood Hazard Analysis

    Broader source: Energy.gov [DOE]

    Pantex Facility 10-Year Natural Phenomena Flood Hazard Analysis Presented by B&W Technical Services, Pantex and Pro2Serve October, 2011

  9. New Executive Order Establishes a Federal Flood Risk Management...

    Office of Environmental Management (EM)

    Executive Order Establishes a Federal Flood Risk Management Standard New Executive Order ... Input, on January 30, 2015. The new E.O. amends E.O. 11988, "Floodplain ...

  10. LANL closes road, trails for safety reasons; flooding and erosion...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    closed for safety reasons LANL closes road, trails for safety reasons; flooding and erosion control work under way Closure is in response to the increased fire risk and...

  11. FAIR Act Inventory- FY13

    Broader source: Energy.gov [DOE]

    Federal Activities Inventory Reform (FAIR) Act - INHERENTLY GOVERNMENTAL AND COMMERCIAL ACTIVITIES (IGCA) INVENTORY

  12. September 2013 Storm and Flood Assessment Report

    SciTech Connect (OSTI)

    Walterscheid, J. C.

    2015-12-21

    Between September 10 and 17, 2013, New Mexico and Colorado received a historically large amount of precipitation (Figure 1). This report assesses the damage caused by flooding along with estimated costs to repair the damage at Los Alamos National Laboratory (the Laboratory) on the Pajarito Plateau. Los Alamos County, New Mexico, received between 200% and 600% of the normal precipitation for this time period (Figure 2), and the Laboratory received approximately 450% percent of its average precipitation for September (Figure 3). As a result, the Laboratory was inundated with rain, including the extremely large, greater-than-1000-yr return period event that occurred between September 12 and 13 (Table 1). With saturated antecedent soil conditions from the September 10 storm, when the September 12 to September 13 storm hit, the flooding was disastrous to the Laboratory’s environmental infrastructure, including access roads, gage stations, watershed controls, control measures installed under the National Pollutant Discharge Elimination System Permit (hereafter, the Individual Permit), and groundwater monitoring wells (Figures 4 through 21). From September 16 to October 1, 2013, the Laboratory completed field assessments of environmental infrastructure and generated descriptions and estimates of the damage, which are presented in spreadsheets in Attachments 1 to 4 of this report. Section 2 of this report contains damage assessments by watershed, including access roads, gage stations, watershed controls, and control measures installed under the Individual Permit. Section 3 contains damage assessments of monitoring wells by the groundwater monitoring groups as established in the Interim Facility-Wide Groundwater Monitoring Plan for Monitoring Year 2014. Section 4 addresses damage and loss of automated samplers. Section 5 addresses sediment sampling needs, and Section 6 is the summary of estimated recovery costs from the significant rain and flooding during September 2013.

  13. Georgia Shore Assistance Act

    SciTech Connect (OSTI)

    Pendergrast, C.

    1984-01-01

    The Georgia General Assembly passed the Shore Assistance Act in 1979 in order to fill a regulatory gap in the state's management of its coastal resources. A review of its legislative history, purposes, applications, and effects in terms of the sand sharing system of sand dunes, beaches, sandbars, and shoals concludes that the Act is poorly drafted. In its application on the oceanfront, it betrays its intent and protects the oceanfront owner. It has failed to satisfy the requirements of the public trust in the tidal foreshore. Amendments to clarify its understanding of the functions and values of the sand-sharing system should also conform with the state's duties under the public trust. 139 references.

  14. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Recovery Act Center Map PERFORMANCE The Department estimates the $6 billion Recovery Act investment will allow us to complete work now that would cost approximately $13 billion in future years, saving $7 billion. As Recovery Act work is completed through the cleanup of contaminated sites, facilities, and material disposition, these areas will becoming available for potential reuse by other entities. Recovery Act funding is helping the Department reach our cleanup goals faster.

  15. Toxic Substances Control Act

    SciTech Connect (OSTI)

    Not Available

    1992-05-15

    This Reference Book contains a current copy of the Toxic Substances Control Act and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. Questions concerning this Reference Book may be directed to Mark Petts, EH-231 (202/586-2609).

  16. General Privacy Act Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act Guidance General Privacy Act Guidance This document provides information on Privacy Act Requests and responses to general FAQs PDF icon General Privacy Act Guidance ...

  17. Davis-Bacon Act Compliance Video

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Davis-Bacon Act Compliance Video

  18. STATEMENT OF ELLIOT MAINZER ACTING ADMINISTRATOR BONNEVILLE POWER...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of coordinated power operations with Canada. * Define a workable approach to flood risk management that will continue to provide a similar level of flood risk management to...

  19. WIPP - Privacy Act of 1974

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Privacy Act Quick Links Affidavit For Surviving Relative Request for Report of Radiation Exposure History 5 U.S.C. § 552a 10 CFR 1008 Privacy Act of 1974 TABLE OF CONTENTS HOW TO MAKE A PRIVACY ACT REQUEST WITH THE U. S. DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE PRIVACY ACT OVERVIEW DISCLOSURE OF PERSONAL INFORMATION VIOLATIONS EXEMPTIONS FEES AND TIME LIMITS LINKS TO OTHER INTERESTING SITES HOW TO MAKE A PRIVACY ACT REQUEST WITH THE U. S. DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE Privacy Act

  20. The Progressive Insurance Automotive X PRIZE Education Program

    SciTech Connect (OSTI)

    Robyn Ready

    2011-12-31

    The Progressive Insurance Automotive X PRIZE Education Program conducted education and outreach activities and used the competition's technical goals and vehicle demonstrations as a means of attracting students and the public to learn more about advanced vehicle technologies, energy efficiency, climate change, alternative fuels, and the science and math behind efficient vehicle development. The Progressive Insurance Automotive X PRIZE Education Program comprised three integrated components that were designed to educate the general public and create a multi-tiered initiative to engage students and showcase the 21st century skills students will need to compete in our global economy: teamwork, creativity, strong literacy, math and science skills, and innovative thinking. The elements included an Online Experience, a National Student Contest, and in person education events and activites. The project leveraged online connections, strategic partnerships, in-classroom, and beyond-the-classroom initiatives, as well as mainstream media. This education program supported by the U.S. Department of Energy (DOE) also funded the specification of vehicle telemetry and the full development and operation of an interactive online experience that allowed internet users to follow the Progressive Insurance Automotive X PRIZE vehicles as they performed in real-time during the Progressive Insurance Automotive X PRIZE competition events.

  1. New York Recovery Act Snapshot

    Broader source: Energy.gov [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in New York are supporting a...

  2. The Privacy Act of 1974

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act of 1974 The Privacy Act of 1974, 5 U.S.C. §552a, governs an agency's collection, storage, and use of information about an individual. The Privacy Act protects the privacy of individuals by establishing fair information practices for the collection, maintenance, use, and dissemination of information by federal agencies. Frequently Asked Questions Who is an individual for the purposes of the Privacy Act? A (living) citizen of the United States or an alien lawfully admitted for

  3. Recovery Act State Memos Alabama

    Broader source: Energy.gov (indexed) [DOE]

    Updated July 2010 | Department of Energy Chart listing projects selected for Smart Grid Investment Grants under American Recovery and Reinvestment Act. There is a November 2011 Update to the "Recovery Act Selections for Smart Grid Investment Grant Awards - By Category" file. Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category (461.59 KB) More Documents & Publications FINAL Combined SGIG Selections - By Category for Press -AOv10.xls Recovery Act Selections

  4. Recovery Act State Memos Tennessee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act State Memos Tennessee For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  5. American Recovery and Reinvestment Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    American Recovery and Reinvestment Act American Recovery and Reinvestment Act LANL was able to accelerate demolition and cleanup thanks to a $212 million award from the American Recovery and Reinvestment Act. August 1, 2013 Excavation trench and enclosure at TA-21. To protect air quality, MDA B is excavated under a dome. By September 2011, all projects were complete. In 2010 and 2011, LANL received $212 million in funding from the American Recovery and Reinvestment Act to complete three

  6. Recovery Act State Memos Illinois

    Broader source: Energy.gov (indexed) [DOE]

    ......... 13 RECOVERY ACT SUCCESS STORIES - ENERGY EMPOWERS * Retooled machines bring new green jobs to Illinois ......15 * County partners ...

  7. Renee Forney (Acting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renee Forney (Acting) About Us Renee Forney (Acting) - Deputy CIO for Cybersecurity

  8. #ActOnClimate: It's Earth Week on Energy.gov | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    #ActOnClimate: It's Earth Week on Energy.gov #ActOnClimate: It's Earth Week on Energy.gov April 21, 2014 - 9:36am Addthis The Energy Sector's Vulnerabilities to Climatic Conditions x Impacts Due to... Increasing Temperatures Decreasing Water Availability Increasing Storms, Flooding, and Sea Level Rise See All Impacts Map locations are approximate. Find out more about this data here. Click and drag the map to read about each location. Marissa Newhall Marissa Newhall Director of Digital Strategy

  9. A NEW GENERATION CHEMICAL FLOODING SIMULATOR

    SciTech Connect (OSTI)

    Gary A. Pope; Kamy Sepehrnoori; Mojdeh Delshad

    2005-01-01

    The premise of this research is that a general-purpose reservoir simulator for several improved oil recovery processes can and should be developed so that high-resolution simulations of a variety of very large and difficult problems can be achieved using state-of-the-art algorithms and computers. Such a simulator is not currently available to the industry. The goal of this proposed research is to develop a new-generation chemical flooding simulator that is capable of efficiently and accurately simulating oil reservoirs with at least a million gridblocks in less than one day on massively parallel computers. Task 1 is the formulation and development of solution scheme, Task 2 is the implementation of the chemical module, and Task 3 is validation and application. In this final report, we will detail our progress on Tasks 1 through 3 of the project.

  10. FAST ACTING CURRENT SWITCH

    DOE Patents [OSTI]

    Batzer, T.H.; Cummings, D.B.; Ryan, J.F.

    1962-05-22

    A high-current, fast-acting switch is designed for utilization as a crowbar switch in a high-current circuit such as used to generate the magnetic confinement field of a plasma-confining and heat device, e.g., Pyrotron. The device particularly comprises a cylindrical housing containing two stationary, cylindrical contacts between which a movable contact is bridged to close the switch. The movable contact is actuated by a differential-pressure, airdriven piston assembly also within the housing. To absorb the acceleration (and the shock imparted to the device by the rapidly driven, movable contact), an adjustable air buffer assembly is provided, integrally connected to the movable contact and piston assembly. Various safety locks and circuit-synchronizing means are also provided to permit proper cooperation of the invention and the high-current circuit in which it is installed. (AEC)

  11. Triple acting radial seal

    SciTech Connect (OSTI)

    Ebert, Todd A; Carella, John A

    2012-03-13

    A triple acting radial seal used as an interstage seal assembly in a gas turbine engine, where the seal assembly includes an interstage seal support extending from a stationary inner shroud of a vane ring, the interstage seal support includes a larger annular radial inward facing groove in which an outer annular floating seal assembly is secured for radial displacement, and the outer annular floating seal assembly includes a smaller annular radial inward facing groove in which an inner annular floating seal assembly is secured also for radial displacement. A compliant seal is secured to the inner annular floating seal assembly. The outer annular floating seal assembly encapsulates the inner annular floating seal assembly which is made from a very low alpha material in order to reduce thermal stress.

  12. Making a Privacy Act Request - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Making a Privacy Act Request Freedom of Information and Privacy Act DOE Headquarters FOIA Web Page A Citizen's Guide to the FOIA and Privacy Act Making a Privacy Act Request Freedom of Information Act, 5 U.S.C. Freedom of Information Act Regulations Privacy Act Regulations DOE Public Reading Room PNNL Technical Library Electronic FOIA Reading Room Freedom of Information Act & Privacy Act Contacts Records Previously Disclosed Helpful Links FOIA Home Making a Privacy Act Request Email Email

  13. Organized investigation expedites insurance claims following a blowout

    SciTech Connect (OSTI)

    Armstreet, R.

    1996-01-22

    Various types of insurance policies cover blowouts to different degrees, and a proper understanding of the incident and the coverage can expedite the adjustment process. Every well control incident, and the claim arising therefrom, has a unique set of circumstances which must be analyzed thoroughly. A blowout incident, no matter what size or how severe, can have an emotional impact on all who become involved. Bodily injuries or death of friends and coworkers can result in additional stress following a blowout. Thus, it is important that all parties involved remain mindful of sensitive matters when investigating a blowout. This paper reviews the definition of a blowout based on insurance procedures and claims. It reviews blowout expenses and contractor cost and accepted well control policies. Finally, it reviews the investigation procedures normally followed by an agent and the types of information requested from the operator.

  14. Insurance issues and natural gas vehicles. Final report, January 1992

    SciTech Connect (OSTI)

    Squadron, W.F.; Ward, C.O.; Brown, M.H.

    1992-01-01

    GRI has been funding research on natural gas vehicle (NGV) technology since 1986. To support the activity, GRI is evaluating a number of NGV issues including fuel storage, tank inspection, system safety, refueling, U.S. auto and truck use characteristics, and the fleet vehicle infrastructure. In addition, insurance and leasing companies will require new regulations and policies to address clean-fueled vehicle fleets' emergence into the marketplace. These policies may influence and partially determine the structure of the alternatively fueled vehicle industry, and the requirements, if any, imposed upon vehicle technologies. The report asseses the insurance and leasing industries' infrastructure/institutional barriers as they relate to the introduction of natural gas fueled vehicle fleets.

  15. What oilheat merketers should look for when purchasing commercial insurance

    SciTech Connect (OSTI)

    Tobin, P.

    1997-02-01

    Choosing the right insurance policy is important. It is not only a matter of saving money; it could mean the company`s survival. The first task in putting together an insurance and risk management program is to identify the company`s risks. One way to understand the exposures is to ask, {open_quotes}What keeps me up at night?{close_quotes} Is it the possibility of a truck turning over on the highway, a driver over-pumping or making an erroneous delivery, or misuse of a terminal access key? Or perhaps all of the above. Once risks are identified, a company has several ways to handle them. One option is to eliminate or at least limit them. Companies in more rural areas may decide not to diversify into liquid gas, for example, for the extra risk that type of fuel brings with it.

  16. Double acting bit holder

    DOE Patents [OSTI]

    Morrell, Roger J.; Larson, David A.; Ruzzi, Peter L.

    1994-01-01

    A double acting bit holder that permits bits held in it to be resharpened during cutting action to increase energy efficiency by reducing the amount of small chips produced. The holder consist of: a stationary base portion capable of being fixed to a cutter head of an excavation machine and having an integral extension therefrom with a bore hole therethrough to accommodate a pin shaft; a movable portion coextensive with the base having a pin shaft integrally extending therefrom that is insertable in the bore hole of the base member to permit the moveable portion to rotate about the axis of the pin shaft; a recess in the movable portion of the holder to accommodate a shank of a bit; and a biased spring disposed in adjoining openings in the base and moveable portions of the holder to permit the moveable portion to pivot around the pin shaft during cutting action of a bit fixed in a turret to allow front, mid and back positions of the bit during cutting to lessen creation of small chip amounts and resharpen the bit during excavation use.

  17. Title 10 Chapter 45 Connecticut River Flood Control Compact ...

    Open Energy Info (EERE)

    5 Connecticut River Flood Control Compact Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 45 Connecticut River...

  18. New Executive Order Establishes a Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    President Obama signed Executive Order (E.O.) 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input, on January 30, 2015.

  19. Mine subsidence in Illinois: facts for the homeowner considering insurance

    SciTech Connect (OSTI)

    DuMontelle, P.B.; Bradford, S.C.; Bauer, R.A.; Killey, M.M.

    1981-08-01

    Subsidence is the sinking of land surface, commonly resulting from underground mining. In Illinois, property damage has been sufficiently severe that a state law was enacted to provide subsidence insurance for homeowners. This publication has been prepared for homeowners in Illinois: (1) to inform them whether they live in subsidence-prone areas, (2) to aid them in understanding some frequently encountered effects of mine subsidence as well as problems sometimes mistaken for mine subsidence, and (3) to suggest further sources of information. Although the new subsidence insurance program for homeowners in mining areas prompted the writing of this report, we do not attempt to explain the details of the insurance program. Our purpose is to explain the causes and the nature of subsidence and discuss ways to minimize damage caused by subsidence. About 750,000 acres of Illinois land have been undermined for coal, and many homeowners are concerned about the effects underground mining may d at nine areas alalitative methods are presented. Chapter Five presents conclusions and suggestions for future research.

  20. Audit of Department of Energy`s contractor liability insurance costs

    SciTech Connect (OSTI)

    1996-09-13

    Fifty-four of DOE`s major contractors reported expending $44.3 million in liability insurance costs for the last 3 years of operation. Purpose of this audit was to evaluate how DOE implemented its policy to assume the risk of losses for its contractors rather than to insure them commercially. Contractors are required to use self-insurance if combined annual premiums for commercial insurance exceed $10,000. Review of 18 major contractors showed that DOE was not consistently following its policy and that contractors using commercial insurance incurred higher costs. Required approvals were not always obtained prior to purchasing certain other types of liability insurance. It is recommended that DOE`s policies requiring self-insurance be fully implemented; that requests for approval for commercial insurance when annual premiums exceeded $10,000 be fully justified; and that the commercial insurance policies specifically define the liability coverage prior to approval and payment. It is also recommended that the contracts include clauses limiting reimbursements for insurance expenditures to actual losses and administrative costs.

  1. 05679_ChemFlood | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bridging the Gap between Chemical Flooding and Independent Oil Producers Last Reviewed 12/15/2012 DE-NT0005679 Goal The goal of this project is to design efficient chemical flooding processes that are necessary for independent oil producers to make an informed assessment for implementation of a pilot or demonstration project. Performer University of Kansas Center for Research, Lawrence, Kan. Collaborators Nine independent oil companies that produce oil from ten Kansas fields are providing data

  2. Flooding Experiments and Modeling for Improved Reactor Safety

    SciTech Connect (OSTI)

    Solmos, M., Hogan, K.J., VIerow, K.

    2008-09-14

    Countercurrent two-phase flow and “flooding” phenomena in light water reactor systems are being investigated experimentally and analytically to improve reactor safety of current and future reactors. The aspects that will be better clarified are the effects of condensation and tube inclination on flooding in large diameter tubes. The current project aims to improve the level of understanding of flooding mechanisms and to develop an analysis model for more accurate evaluations of flooding in the pressurizer surge line of a Pressurized Water Reactor (PWR). Interest in flooding has recently increased because Countercurrent Flow Limitation (CCFL) in the AP600 pressurizer surge line can affect the vessel refill rate following a small break LOCA and because analysis of hypothetical severe accidents with the current flooding models in reactor safety codes shows that these models represent the largest uncertainty in analysis of steam generator tube creep rupture. During a hypothetical station blackout without auxiliary feedwater recovery, should the hot leg become voided, the pressurizer liquid will drain to the hot leg and flooding may occur in the surge line. The flooding model heavily influences the pressurizer emptying rate and the potential for surge line structural failure due to overheating and creep rupture. The air-water test results in vertical tubes are presented in this paper along with a semi-empirical correlation for the onset of flooding. The unique aspects of the study include careful experimentation on large-diameter tubes and an integrated program in which air-water testing provides benchmark knowledge and visualization data from which to conduct steam-water testing.

  3. LANL completes high-priority flood and erosion control work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab completes priority erosion controls LANL completes high-priority flood and erosion control work Crews installed 600 feet of water diversion barriers and removed more than 1,200 cubic yards of sediment in anticipation of flash flooding. July 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics

  4. Michael R. Maraya (Acting) | Department of Energy

    Office of Environmental Management (EM)

    R. Maraya (Acting) About Us Michael R. Maraya (Acting) - Deputy CIO for Enterprise Policy, Portfolio Management & Governance Mike Maraya is the Acting Deputy CIO for Enterprise...

  5. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Opportunities » Past Opportunities » Recovery Act Recovery Act Pie chart diagram shows the breakdown of how cost-sharing funds relatedto the American Recovery and Reinvestment Act from industry participants,totaling $54 million (for a grand total of $96 million), are allocatedwithin the Fuel Cell Technologies Office, updated September 2010. Thediagram shows that $18.5 million is allocated to backup power, $9.7million is allocated to lift truck, $7.6 million is allocated to

  6. Recovery Act State Memos Alaska

    Broader source: Energy.gov (indexed) [DOE]

    Alaska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  7. Recovery Act State Memos Arizona

    Broader source: Energy.gov (indexed) [DOE]

    Arizona For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  8. Recovery Act State Memos Arkansas

    Broader source: Energy.gov (indexed) [DOE]

    Arkansas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  9. Recovery Act State Memos California

    Broader source: Energy.gov (indexed) [DOE]

    California For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  10. Recovery Act State Memos Colorado

    Broader source: Energy.gov (indexed) [DOE]

    Colorado For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  11. Recovery Act State Memos Connecticut

    Broader source: Energy.gov (indexed) [DOE]

    Connecticut For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  12. Recovery Act State Memos Delaware

    Broader source: Energy.gov (indexed) [DOE]

    Delaware For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  13. Recovery Act State Memos Florida

    Broader source: Energy.gov (indexed) [DOE]

    Florida For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  14. Recovery Act State Memos Georgia

    Broader source: Energy.gov (indexed) [DOE]

    Georgia For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  15. Recovery Act State Memos Guam

    Broader source: Energy.gov (indexed) [DOE]

    Guam For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  16. Recovery Act State Memos Hawaii

    Broader source: Energy.gov (indexed) [DOE]

    Hawaii For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  17. Recovery Act State Memos Idaho

    Broader source: Energy.gov (indexed) [DOE]

    Idaho For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  18. Recovery Act State Memos Indiana

    Broader source: Energy.gov (indexed) [DOE]

    Indiana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  19. Recovery Act State Memos Iowa

    Broader source: Energy.gov (indexed) [DOE]

    Iowa For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  20. Recovery Act State Memos Kansas

    Broader source: Energy.gov (indexed) [DOE]

    Kansas For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  1. Recovery Act State Memos Kentucky

    Broader source: Energy.gov (indexed) [DOE]

    Kentucky For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  2. Recovery Act State Memos Louisiana

    Broader source: Energy.gov (indexed) [DOE]

    Louisiana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  3. Recovery Act State Memos Maine

    Broader source: Energy.gov (indexed) [DOE]

    Maine For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  4. Recovery Act State Memos Maryland

    Broader source: Energy.gov (indexed) [DOE]

    Maryland For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  5. Recovery Act State Memos Massachusetts

    Broader source: Energy.gov (indexed) [DOE]

    Massachusetts For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  6. Recovery Act State Memos Michigan

    Broader source: Energy.gov (indexed) [DOE]

    Michigan For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  7. Recovery Act State Memos Minnesota

    Broader source: Energy.gov (indexed) [DOE]

    Minnesota For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  8. Recovery Act State Memos Mississippi

    Broader source: Energy.gov (indexed) [DOE]

    Mississippi For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  9. Recovery Act State Memos Montana

    Broader source: Energy.gov (indexed) [DOE]

    Montana For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  10. Recovery Act State Memos Nebraska

    Broader source: Energy.gov (indexed) [DOE]

    Nebraska For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  11. Recovery Act State Memos Ohio

    Broader source: Energy.gov (indexed) [DOE]

    Ohio For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  12. Recovery Act State Memos Oklahoma

    Broader source: Energy.gov (indexed) [DOE]

    Oklahoma For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  13. Recovery Act State Memos Oregon

    Broader source: Energy.gov (indexed) [DOE]

    Oregon For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  14. Recovery Act State Memos Texas

    Broader source: Energy.gov (indexed) [DOE]

    Tennessee For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  15. Recovery Act State Memos Utah

    Broader source: Energy.gov (indexed) [DOE]

    Utah For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  16. Recovery Act State Memos Vermont

    Broader source: Energy.gov (indexed) [DOE]

    Vermont For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  17. Recovery Act State Memos Virginia

    Broader source: Energy.gov (indexed) [DOE]

    Virginia For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  18. Recovery Act State Memos Washington

    Broader source: Energy.gov (indexed) [DOE]

    Washington For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  19. Recovery Act State Memos Wyoming

    Broader source: Energy.gov (indexed) [DOE]

    Wyoming For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION

  20. PAPERWORK REDUCTION ACT OF 1995

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAPERWORK REDUCTION ACT OF 1995 U. S. DEPARTMENT OF ENERGY INFORMATION COLLECTION MANAGEMENT PROGRAM Chris Rouleau, PRA Officer Records Management Division Office of the Associate Chief Information Officer for IT Planning, Architecture and E-Government Office of the Chief Information Officer Office of the Chief Information Officer 2/16/2010 2 TOPICS  Paperwork Reduction Act (PRA) of 1995 - Law  Paperwork Reduction Act - Overview  Information Collection Requests (ICRs)  Information

  1. Real ID Act in brief

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Real Estate Approvals Real Estate Approvals Real Estate Approvals Policy Flash 2011-61, Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate (attachment)

    Visitors » Badging, Badge Office » Real ID Act in brief Real ID Act in brief Effective Nov. 3, 2014, the Lab will implement requirements of the REAL ID Act. Contact Badge Office (505) 667-6901 Email REAL ID Act in brief REAL ID is a coordinated effort by the states and the Federal Government to improve the

  2. Williamson Act | Open Energy Information

    Open Energy Info (EERE)

    Abstract Williamson Act, Cal. Gov. Code 51200-51297.4, current through June 23, 2014. Published NA Year Signed or Took Effect 1965 Legal Citation Cal. Gov. Code ...

  3. Request for Privacy Act Records

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outreach Doing Business Expand Doing Business Skip navigation links Newsroom About Us Civil Rights - EEO Freedom of Information Act Investor Relations Library Privacy Request for...

  4. Clean Air Act, Section 309

    Energy Savers [EERE]

    CLEAN AIR ACT 309* 7609. Policy review (a) The Administrator shall review and comment in writing on the environmental impact of any matter relating to duties and ...

  5. Freedom of Information Act Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 USC 552. You requested the following: Copies of all...

  6. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere: Electric Vehicle Benefits Recovery Act Plug-in electric vehicles (also known as electric cars or EVs) are connected, fun, and practical. They can reduce emissions, ...

  7. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RECIPIENTS Smart Grid Investment Grant 3,482,831,000 99 ... Transmission Planning 80,000,000 6 State Assistance for Recovery Act Related Electricity Policies ...

  8. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    to increase our supply of clean, renewable energy. July 11, 2013 Demand Response: Lessons Learned with an Eye to the Future Under the Recovery Act, the Energy Department...

  9. Polymer flood of the Rapdan pool

    SciTech Connect (OSTI)

    Pitts, M.J.; Surkalo, H.; Wyatt, K.; Campbell, T.A.

    1995-08-01

    A polymer-flood project in the Rapdan field is documented from laboratory design and numerical simulation to production performance and projected economics. The Rapdan field produces 10-mPa{center_dot}s oil from the Upper Shaunavon sand at a reservoir temperature of 55 C. Average permeability is 0.114 {mu}m{sup 2}, average porosity is 18%, and Dykstra-Parsons coefficient is 0.8. The field was discovered in 1953, and waterflood began in 1962. In January 1986, a polymer pilot was initiated in a portion of the field with a PV of 456 {times} 10{sup 4} m{sup 3}. The pilot consists of 13 producers and 5 injectors drilled on 162 {times} 10{sup 3}-m{sup 2} spacing. By December 1994, 43% PV, of a 21-mPa{center_dot}s polymer solution had been injected into a confined, central five spot (Wells 12-12 and 12-12A). The oil cut increased from a stable value of 8% during the waterflood to a peak value of 25%. The corresponding daily oil production increased from 8 to 28 m{sup 3}/d at an oil cut of 36%. Production rate has declined from 140 m{sup 3}/d in 1991 to 106 m{sup 3}/d in December 1994, with a corresponding oil-cut decline from 25% to 20%.

  10. Nuclear Waste Policy Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Waste Policy Act Nuclear Waste Policy Act Document on the Nuclear Waste Policy Act of 1982 An Act to provide for the development of repositories for the disposal of ...

  11. Biomass Program Recovery Act Factsheet

    SciTech Connect (OSTI)

    2010-03-01

    The Biomass Program has awarded about $718 million in American Recovery and Reinvestment Act (Recovery Act) funds. The projects the Program is supporting are intended to: Accelerate advanced biofuels research, development, and demonstration; Speed the deployment and commercialization of advanced biofuels and bioproducts; Further the U.S. bioindustry through market transformation and creating or saving a range of jobs.

  12. Insuring low-level radioactive waste sites: Past, present, and future

    SciTech Connect (OSTI)

    Viveiros, G.F. III

    1989-11-01

    The primary purpose of the paper is to provide information concerning the availability of nuclear liability insurance coverage under the Facility Form for low-level radioactive waste facilities only. The paper describes the past history of insurers and their merger into the Nuclear Atomic Energy Liability Underwriters (MAELU). The paper discusses the coverage afforded, underwriting suspension, and work the nuclear insurance pools are doing to lift the suspension.

  13. DOE Releases Filing Instructions for Federal Risk Insurance for New Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Plants | Department of Energy Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants DOE Releases Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants December 21, 2007 - 4:58pm Addthis Outlines Five Steps for New Nuclear Plant Sponsors to Enter Into a Conditional Agreement for Risk Insurance WASHINGTON, DC - The U.S. Department of Energy (DOE) today released instructions for companies building new nuclear power plants in the United States to

  14. Funding Opportunity Announcement: Recovery Act ? Energy Efficiency...

    Office of Environmental Management (EM)

    Funding Opportunity Announcement: Recovery Act Energy Efficiency and Conversation Block Grants Formula Grants Funding Opportunity Announcement: Recovery Act Energy...

  15. POISON SPIDER FIELD CHEMICAL FLOOD PROJECT, WYOMING

    SciTech Connect (OSTI)

    Douglas Arnell; Malcolm Pitts; Jie Qi

    2004-11-01

    -rock compatibility, polymer injectivity, dynamic chemical retention by rock, and recommended injected polymer concentration. Average initial oil saturation was 0.796 Vp. Produced water injection recovered 53% OOIP leaving an average residual oil saturation of 0.375 Vp. Poison Spider rock was strongly water-wet with a mobility ratio for produced water displacing the 280 cp crude oil of 8.6. Core was not sensitive to either alkali or surfactant injection. Injectivity increased 60 to 80% with alkali plus surfactant injection. Low and medium molecular weight polyacrylamide polymers (Flopaam 3330S and Flopaam 3430S) dissolved in either an alkaline-surfactant solution or softened produced water injected and flowed through Poison Spider rock. Recommended injected polyacrylamide concentration is 2,100 mg/L for both polymers for a unit mobility ratio. Radial corefloods were performed to evaluate oil recovery efficiency of different chemical solutions. Waterflood oil recovery averaged 46.4 OOIP and alkaline-surfactant-polymer flood oil recovery averaged an additional 18.1% OIP for a total of 64.6% OOIP. Oil cut change due to injection of a 1.5 wt% Na{sub 2}CO{sub 3} plus 0.05 wt% Petrostep B-100 plus 0.05 wt% Stepantan AS1216 plus 2100 mg/L Flopaam 3430S was from 2% to a peak of 23.5%. Additional study might determine the impact on oil recovery of a lower polymer concentration. An alkaline-surfactant-polymer flood field implementation outline report was written.

  16. Freedom of Information Act (FOIA) and Privacy Act Requests |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    penalty in the Privacy Act for requesting or obtaining access to records under false pretenses, and 2) include a declaration that your statement is true and correct under penalty ...

  17. Recovery Act: State Assistance for Recovery Act Related Electricity Policies

    Broader source: Energy.gov [DOE]

    State public utility commissions (PUCs), which regulate and oversee electricity projects in their states, will be receiving more than $44.2 million in Recovery Act funding to hire new staff and retrain existing employees to ensure they have the capacity to quickly and effectively review proposed electricity projects. The funds will help the individual state PUCs accelerate reviews of the large number of electric utility requests that are expected under the Recovery Act.

  18. DOE Recovery Act Field Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Field Projects DOE Recovery Act Field Projects DOE Recovery Act Field Projects

  19. Bridging the Gap between Chemical Flooding and Independent Oil Producers

    SciTech Connect (OSTI)

    Stan McCool; Tony Walton; Paul Whillhite; Mark Ballard; Miguel Rondon; Kaixu Song; Zhijun Liu; Shahab Ahmed; Peter Senior

    2012-03-31

    Ten Kanas oil reservoirs/leases were studied through geological and engineering analysis to assess the potential performance of chemical flooding to recover oil. Reservoirs/leases that have been efficiently waterflooded have the highest performance potential for chemical flooding. Laboratory work to identify efficient chemical systems and to test the oil recovery performance of the systems was the major effort of the project. Efficient chemical systems were identified for crude oils from nine of the reservoirs/leases. Oil recovery performance of the identified chemical systems in Berea sandstone rocks showed 90+ % recoveries of waterflood residual oil for seven crude oils. Oil recoveries increased with the amount of chemical injected. Recoveries were less in Indiana limestone cores. One formulation recovered 80% of the tertiary oil in the limestone rock. Geological studies for nine of the oil reservoirs are presented. Pleasant Prairie, Trembley, Vinland and Stewart Oilfields in Kansas were the most favorable of the studied reservoirs for a pilot chemical flood from geological considerations. Computer simulations of the performance of a laboratory coreflood were used to predict a field application of chemical flooding for the Trembley Oilfield. Estimates of field applications indicated chemical flooding is an economically viable technology for oil recovery.

  20. Assessment & Commitment Tracking System (ACTS)

    SciTech Connect (OSTI)

    Bryant, Robert A.; Childs, Teresa A.; Miller, Michael A.; Sellars, Kevin J.

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTML JavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Server

  1. Assessment & Commitment Tracking System (ACTS)

    Energy Science and Technology Software Center (OSTI)

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTMLmoreJavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Serverless

  2. Assessment & Commitment Tracking System (ACTS)

    Energy Science and Technology Software Center (OSTI)

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTMLmore » JavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Server« less

  3. From Risk to Opportunity. How Insurers Can Proactively and Profitably Manage Climate Change

    SciTech Connect (OSTI)

    Mills, E.; Lecomte, E.

    2006-08-15

    Last year's USD 45 billion of insured losses from Hurricane Katrina was only the latest reminder of why investors and consumers are concerned about the impacts of climate change on the insurance industry. Twelve months after the devastating storm hit New Orleans, insurers and their shareholders are still feeling the ripples. Record insured losses, rating downgrades, coverage pullbacks and class-action lawsuits are just a few of the reverberations that have been felt across the industry. Meanwhile, consumers are feeling the combined sting of price shocks and reduced availability. So serious is the issue that 20 leading investors, representing over $800 billion in assets, called on the nation's largest insurance companies to disclose their financial exposure from climate change and steps they are taking to reduce those financial impacts. But, while most of the attention is focused on the growing risks, climate change also creates vast business opportunities to be part of the solution to global warming. Just as the industry has historically asserted its leadership to minimize risks from building fires and earthquakes, insurers have a huge opportunity today to develop creative loss-prevention products and services that will reduce climate-related losses for consumers, governments and insurers, while trimming the emissions causing global warming. This report focuses on the encouraging progress made by insurers to develop these new products and services. It identifies more than 190 concrete examples available, or soon-to-be-available, from dozens of insurance providers in 16 countries. In addition to benefiting insurers' core business and investment activities, these programs afford insurers the opportunity to differentiate their products from their competitors, while also enhancing their reputation with customers who are increasingly looking for all sectors of the industry to come forward with effective responses to the threats caused by climate change. More than half

  4. Monitoring EERE's Recovery Act Portfolio

    SciTech Connect (OSTI)

    2011-01-01

    Performance monitoring of Recovery Act projects within EERE has been an ongoing effort. Project recipients have been reporting technical and financial progress to project officers on a quarterly basis.

  5. Freedom of Information Act Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Privacy Act must be signed and, therefore, cannot be submitted on this form. Name Richard van Dijk Email Orga nizati AnotherWayBPA on Maim g Addre ss City RECEIVED BY BPA...

  6. Recovery Act Funding Opportunities Webcast

    Broader source: Energy.gov [DOE]

    As a result of the 2009 American Reinvestment and Recovery Act, the Geothermal Technologies Office (GTO) has four open Funding Opportunity Announcements (FOAs) totaling $484 million for cost-shared...

  7. Juana Del Pilar Silverio (Acting)

    Broader source: Energy.gov [DOE]

    Ms. Juana Del Pilar Silverio, Esq. is currently detailed to the Department of Energy’s Office of the Chief Information Officer as Acting Deputy Chief of Staff. Ms. Silverio joined the...

  8. Freedom of Information Act Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10:11 AM Submitted by Anonymous User This message was created by a Microsoft InfoPath form. The form data may be included as an attachment. Freedom of Information Act (FOIA)...

  9. LANL exceeds Early Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exceeds Early Recovery Act recycling goals March 8, 2010 More than 136 tons of metal saved from demolished buildings LOS ALAMOS, New Mexico, March 9, 2009-Los Alamos National Laboratory announced today that Lab demolition projects under the American Recovery and Reinvestment Act have recovered more than 136 tons of recyclable metal since work began last year, largely due to the skill of heavy equipment operators and efforts to gut the buildings before they come down. Some 106 tons of metal came

  10. Analysis of national pay-as-you-drive insurance systems and other variable driving charges

    SciTech Connect (OSTI)

    Wenzel, T.

    1995-07-01

    Under Pay as You Drive insurance (PAYD), drivers would pay part of their automobile insurance premium as a per-gallon surcharge every time they filled their gas tank. By transfering a portion of the cost of owning a vehicle from a fixed cost to a variable cost, PAYD would discourage driving. PAYD has been proposed recently in California as a means of reforming how auto insurance is provided. PAYD proponents claim that, by forcing drivers to purchase at least part of their insurance every time they refuel their car, PAYD would reduce or eliminate the need for uninsured motorist coverage. Some versions of PAYD proposed in California have been combined with a no-fault insurance system, with the intention of further reducing premiums for the average driver. Other states have proposed PAYD systems that would base insurance premiums on annual miles driven. In this report we discuss some of the qualitative issues surrounding adoption of PAYD and other policies that would convert other fixed costs of driving (vehicle registration, safety/emission control system inspection, and driver license renewal) to variable costs. We examine the effects of these policies on two sets of objectives: objectives related to auto insurance reform, and those related to reducing fuel consumption, CO{sub 2} emissions, and vehicle miles traveled. We pay particular attention to the first objective, insurance reform, since this has generated the most interest in PAYD to date, at least at the state level.

  11. Human-Induced Climate Change Reduces Chance of Flooding in Okavango...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human-Induced Climate Change Reduces Chance of Flooding in Okavango Delta Human-Induced Climate Change Reduces Chance of Flooding in Okavango Delta Africa.gif Why it Matters: The...

  12. Human-induced climate change reduces chance of flooding in Okavango...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human-induced climate change reduces chance of flooding in Okavango Delta Human-induced climate change reduces chance of flooding in Okavango Delta March 27, 2014 University of ...

  13. Paperwork Reduction Act Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form Paperwork Reduction Act Form Collection Discontinuation Form Paperwork Reduction Act Form (17.93 KB) More Documents & Publications OMB83 D Discontinuance Form OMB 83 C Paperwork Reduction Act Submission (OMB 83-I)

  14. DOE - NNSA/NFO -- Privacy Act Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Privacy Act Information NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Privacy Act Overview The Privacy Act of 1974, Title 5, United States Code, Section 552a, ...

  15. Solar equipment ravaged by floods gets new life

    Broader source: Energy.gov [DOE]

    Mounting the electrical equipment for a solar array 12 feet off the ground on the side of an art studio building seemed like a safe height at first: it would be well above the 100-year-flood mark and out of reach of vandals.

  16. National Environmental Policy Act RM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Environmental Policy Act Review Module March 2010 CD- N -0 OFFICE O National E C CD-1 OF ENVIRO Standa Environm Rev Critical Deci CD-2 M ONMENTA ard Review mental P view Modul ision (CD) A C March 2010 AL MANAG Plan olicy Act le Applicability D-3 GEMENT t (NEPA) CD-4 ) Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could

  17. ARM and the Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates/Announcements Thu, 01 Sep 2011 00:00:00 +0000 http://www.arm.gov en September 2011 Thu, 01 Sep 2011 00:00:00 +0000 aa3f1e269969d96bd7b30dd7a408d745 </p> <p><strong>Final Recovery Act Milestone Complete! </strong> This month, ARM celebrates the delivery of the last few instruments for its Recovery Act investment and reports its final FY11 milestone - "Infrastructure Enhancements Complete." This closes out the

  18. No Fear Act Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    No Fear Act Data No Fear Act Data This document contains data related to the No FEAR Act including complaint basis, processing time, complaints dismissed, and historical information. For more information about the No FEAR Act, visit http://energy.gov/diversity/services/protecting-civil-rights/no-fear-act FY 2013 First Quarter No FEAR Act (883.73 KB) FY 2012 No FEAR Act Data (883.33 KB) 2006 through 2011 No Fear Act Data Summary.pdf (596.43 KB) October 1, 2005 through September 30, 2006 No Fear

  19. Recovery Act Workforce Development | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act Workforce Development Recovery Act Workforce Development Map of Smart Grid Workforce Development Map of Smart Grid Workforce Development 19 Awards Read more Map of Workforce ...

  20. California Permit Streamlining Act | Open Energy Information

    Open Energy Info (EERE)

    California Permit Streamlining Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: California Permit Streamlining ActLegal...

  1. Access to Records Under The Privacy Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outreach Doing Business Expand Doing Business Skip navigation links Newsroom About Us Civil Rights - EEO Freedom of Information Act The Freedom of Information Act Access to...

  2. National Historic Preservation Act | Open Energy Information

    Open Energy Info (EERE)

    goal of the National Historic Preservation Act (NHPA), which established the Advisory Council on Historic Preservation (ACHP) in 1966, is to have federal agencies act as...

  3. Energy Employees Occupational Illness Compensation Program Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Act (EEOICPA) Tracking System PIA, Office of Business Operations Energy Employees Occupational Illness Compensation Program Act (EEOICPA) Tracking System PIA, Office of ...

  4. Enenrgy Employees Occupational Illness Compensation Program Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Act (EEOICPA) Tracking System, PIA, Savannah River Operations Office Enenrgy Employees Occupational Illness Compensation Program Act (EEOICPA) Tracking System, PIA, ...

  5. Archaeological Resources Protection Act | Open Energy Information

    Open Energy Info (EERE)

    Resources Protection Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Archaeological Resources Protection ActLegal...

  6. Archaeological Resources Protection Act | Open Energy Information

    Open Energy Info (EERE)

    Resource Protection Act) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Archaeological Resources Protection ActLegal...

  7. COLORADO RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Colorado are ...

  8. DELAWARE RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Delaware are ...

  9. IOWA RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Iowa are ...

  10. ARKANSAS RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Arkansas are ...

  11. GUAM RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Guam are ...

  12. CONNECTICUT RECOVERY ACT SNAPSHOT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Connecticut are ...

  13. Clean Cities Recovery Act: Vehicle & Infrastructure Deployment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act: Vehicle & Infrastructure Deployment Clean Cities Recovery Act: Vehicle & Infrastructure Deployment 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit...

  14. Government Performance Result Act (GPRA) / Portfolio Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Performance Result Act (GPRA) Portfolio Decision Support (PDS) Government Performance Result Act (GPRA) Portfolio Decision Support (PDS) 2009 DOE Hydrogen Program...

  15. Recovery Act Recipient Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion (CS) Determination, Office of Electricity Delivery and Energy Reliability (OE): American Recovery and Reinvestment Act of 2009 (Recovery Act) Smart Grid Investment ...

  16. Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records | Department of Energy Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records (524.84 KB) More Documents & Publications Federal Register Document, Federal Register / Vol. 69, No. 17 / Tuesday, January 27, 2004 /

  17. EIS-0038: Fuel Use Act

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the programmatic environmental impacts that would result from implementation of the regulations for enacting the coal and alternate fuels use program which has been authorized by the Power Plant and Industrial Fuel Use Act of 1978 (FUA) Pub. L . 95-620.

  18. National Environmental Policy Act (NEPA)

    Broader source: Energy.gov [DOE]

    All Electricity Delivery and Energy Reliability (OE) projects are reviewed under the National Environmental Policy Act (NEPA) of 1969 – 42 U.S.C. Section 4321 et seq. The Department of Energy regulations that implement NEPA require OE to determine whether a proposal requires preparation of an Environmental Impact Statement (EIS), an Environmental Assessment (EA), or a Categorical Exclusion (CX).

  19. SEPA Freedom of Information Act (FOIA) program

    Broader source: Energy.gov [DOE]

    Southeastern Participates in the United States Government’s Freedom of Information Act (FOIA) program.

  20. Assessment of Potential Flood Events and Impacts at INL's Proposed Remote-Handled Low-Level Waste Disposal Facility Sites

    SciTech Connect (OSTI)

    A. Jeff Sondrup; Annette L. Schafter

    2010-09-01

    Rates, depths, erosion potential, increased subsurface transport rates, and annual exceedance probability for potential flooding scenarios have been evaluated for the on-site alternatives of Idaho National Laboratorys proposed remote handled low-level waste disposal facility. The on-site disposal facility is being evaluated in anticipation of the closure of the Radioactive Waste Management Complex at the INL. An assessment of flood impacts are required to meet the Department of Energys Low-Level Waste requirements (DOE-O 435.1), its natural phenomena hazards assessment criteria (DOE-STD-1023-95), and the Radioactive Waste Management Manual (DOE M 435.1-1) guidance in addition to being required by the National Environmental Policy Act (NEPA) environmental assessment (EA). Potential sources of water evaluated include those arising from (1) local precipitation events, (2) precipitation events occurring off of the INL (off-site precipitation), and (3) increased flows in the Big Lost River in the event of a Mackay Dam failure. On-site precipitation events include potential snow-melt and rainfall. Extreme rainfall events were evaluated for the potential to create local erosion, particularly of the barrier placed over the disposal facility. Off-site precipitation carried onto the INL by the Big Lost River channel was evaluated for overland migration of water away from the river channel. Off-site precipitation sources evaluated were those occurring in the drainage basin above Mackay Reservoir. In the worst-case scenarios, precipitation occurring above Mackay Dam could exceed the dams capacity, leading to overtopping, and eventually complete dam failure. Mackay Dam could also fail during a seismic event or as a result of mechanical piping. Some of the water released during dam failure, and contributing precipitation, has the potential of being carried onto the INL in the Big Lost River channel. Resulting overland flows from these flood sources were evaluated for their

  1. Clean Air Act. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1994-02-15

    This Reference Book contains a current copy of the Clean Air Act, as amended, and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. This Reference Book has been completely revised and is current through February 15, 1994.

  2. State Agency Recovery Act Funding

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency Recovery Act Funding .Alabama Alabama Public Service Commission $868,824 .Alaska Regulatory Commission of Alaska $767,493 .Arizona Arizona Corporation Commission $915,679 .Arkansas Arkansas Public Service Commission $822,779 .California California Public Utilities Commission $1,686,869 .Colorado The Public Utilities Commission of the State of Colorado $875,899 .Connecticut Connecticut Department of Public Utility Control $839,241 .Delaware Delaware Public Service Commission $772,254

  3. Managing Floods and Resources at the Arroyo Las Positas

    SciTech Connect (OSTI)

    Sanchez, L; Van Hattem, M; Mathews, S

    2002-03-05

    Engineers and water resource professionals are challenged with protecting facilities from flood events within environmental resource protection, regulatory, and economic constraints. One case in point is the Arroyo Las Positas (ALP), an intermittent stream that traverses the Lawrence Livermore National Laboratory (LLNL) in Livermore, California. Increased runoff from post-drought rainfall, upstream development, and new perennial discharges from LLNL activities have resulted in increased dry weather flows and wetland vegetation. These new conditions have recently begun to provide improved habitat for the federally threatened California red-legged frog (Rana aurora draytonii; CRLF), but the additional vegetation diminishes the channel's drainage capacity and increases flood risk. When LLNL proposed to re-grade the channel to reestablish the 100-year flood capacity, traditional dredging practices were no longer being advocated by environmental regulatory agencies. LLNL therefore designed a desilting maintenance plan to protect LLNL facility areas from flooding, while minimizing impacts to wetland resources and habitat. The result was a combination of structural upland improvements and the ALP Five Year Maintenance Plan (Maintenance Plan), which includes phased desilting in segments so that the entire ALP is desilted after five years. A unique feature of the Maintenance Plan is the variable length of the segments designed to minimize LLNL's impact on CRLF movement. State and federal permits also added monitoring requirements and additional constraints on desilting activities. Two years into the Maintenance Plan, LLNL is examining the lessons learned on the cost-effectiveness of these maintenance measures and restrictions and reevaluating the direction of future maintenance activities.

  4. Laboratory methods for enhanced oil recovery core floods

    SciTech Connect (OSTI)

    Robertson, E.P.; Bala, G.A.; Thomas, C.P.

    1994-03-01

    Current research at the Idaho National Engineering Laboratory (INEL) is investigating microbially enhanced oil recovery (MEOR) systems for application to oil reservoirs. Laboratory corefloods are invaluable in developing technology necessary for a field application of MEOR. Methods used to prepare sandstone cores for experimentation, coreflooding techniques, and quantification of coreflood effluent are discussed in detail. A technique to quantify the small volumes of oil associated with laboratory core floods is described.

  5. Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience Report Now Available

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability has released a report that examines the key risks confronting critical energy infrastructure and ways in which the insurance industry can help manage these risks. In most developed countries, insurance is one of the principal risk management instruments for aiding in recovery after a disaster and for encouraging future investments that are more resilient to potential hazards.

  6. "Insurance as a Risk Management Instrument for Energy Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security and Resilience" Report (March 2013) | Department of Energy "Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience" Report (March 2013) "Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience" Report (March 2013) The Office of Electricity Delivery and Energy Reliability has released a report that examines the key risks confronting critical energy infrastructure and ways in which the

  7. Development of cost-effective surfactant flooding technology. Final report

    SciTech Connect (OSTI)

    Pope, G.A.; Sepehrnoori, K.

    1996-11-01

    Task 1 of this research was the development of a high-resolution, fully implicit, finite-difference, multiphase, multicomponent, compositional simulator for chemical flooding. The major physical phenomena modeled in this simulator are dispersion, heterogeneous permeability and porosity, adsorption, interfacial tension, relative permeability and capillary desaturation, compositional phase viscosity, compositional phase density and gravity effects, capillary pressure, and aqueous-oleic-microemulsion phase behavior. Polymer and its non-Newtonian rheology properties include shear-thinning viscosity, permeability reduction, inaccessible pore volume, and adsorption. Options of constant or variable space grids and time steps, constant-pressure or constant-rate well conditions, horizontal and vertical wells, and multiple slug injections are also available in the simulator. The solution scheme used in this simulator is fully implicit. The pressure equation and the mass-conservation equations are solved simultaneously for the aqueous-phase pressure and the total concentrations of each component. A third-order-in-space, second-order-in-time finite-difference method and a new total-variation-diminishing (TVD) third-order flux limiter are used that greatly reduce numerical dispersion effects. Task 2 was the optimization of surfactant flooding. The code UTCHEM was used to simulate surfactant polymer flooding.

  8. GIS-BASED PREDICTION OF HURRICANE FLOOD INUNDATION

    SciTech Connect (OSTI)

    JUDI, DAVID; KALYANAPU, ALFRED; MCPHERSON, TIMOTHY; BERSCHEID, ALAN

    2007-01-17

    A simulation environment is being developed for the prediction and analysis of the inundation consequences for infrastructure systems from extreme flood events. This decision support architecture includes a GIS-based environment for model input development, simulation integration tools for meteorological, hydrologic, and infrastructure system models and damage assessment tools for infrastructure systems. The GIS-based environment processes digital elevation models (30-m from the USGS), land use/cover (30-m NLCD), stream networks from the National Hydrography Dataset (NHD) and soils data from the NRCS (STATSGO) to create stream network, subbasins, and cross-section shapefiles for drainage basins selected for analysis. Rainfall predictions are made by a numerical weather model and ingested in gridded format into the simulation environment. Runoff hydrographs are estimated using Green-Ampt infiltration excess runoff prediction and a 1D diffusive wave overland flow routing approach. The hydrographs are fed into the stream network and integrated in a dynamic wave routing module using the EPA's Storm Water Management Model (SWMM) to predict flood depth. The flood depths are then transformed into inundation maps and exported for damage assessment. Hydrologic/hydraulic results are presented for Tropical Storm Allison.

  9. A scoping study on the costs of indoor air quality illnesses:an insurance loss reduction perspective

    SciTech Connect (OSTI)

    Chen, Allan; Vine, Edward L.

    1998-08-31

    The incidence of commercial buildings with poor indoor air quality (IAQ), and the frequency of litigation over the effects of poor IAQ is increasing. If so, these increases have ramifications for insurance carriers, which pay for many of the costs of health care and general commercial liability. However, little is known about the actual costs to insurance companies from poor IAQ in buildings. This paper reports on the results of a literature search of buildings-related, business and legal databases, and interviews with insurance and risk management representatives aimed at finding information on the direct costs to the insurance industry of poor building IAQ, as well as the costs of litigation. The literature search and discussions with insurance and risk management professionals reported in this paper turned up little specific information about the costs of IAQ-related problems to insurance companies. However, those discussions and certain articles in the insurance industry press indicate that there is a strong awareness and growing concern over the "silent crisis" of IAQ and its potential to cause large industry losses, and that a few companies are taking steps to address this issue. The source of these losses include both direct costs to insurers from paying health insurance and professional liability claims, as weIl as the cost of litigation. In spite of the lack of data on how IAQ-related health problems affect their business, the insurance industry has taken the anecdotal evidence about their reality seriously enough to alter their policies in ways that have lessened their exposure. We conclude by briefly discussing four activities that need to be addressed in the near future: (1) quantifying IAQ-related insurance costs by sector, (2) educating the insurance industry about the importance of IAQ issues, (3) examining IAQ impacts on the insurance industry in the residential sector, and (4) evaluating the relationship between IAQ improvements and their impact on

  10. The Hanford Story: Recovery Act

    Broader source: Energy.gov [DOE]

    This is the third chapter of The Hanford Story. This chapter is a tribute to the thousands of workers and representatives of regulatory agencies, neighboring states, Tribes, stakeholders, and surrounding communities who came together to put stimulus funding to work at Hanford. The video describes how the Department of Energy and its contractors turned a nearly $2 billion investment of American Recovery and Reinvestment Act funding in 2009 into nearly $4 billion worth of environmental cleanup work over the past two years. At the same time, Hanford workers have reduced the cleanup footprint of the Hanford Site by more than half (586 square miles to 241 sq. mi. through August -- 59 percent).